[{"i":0,"cid":"24EG0058","pid":"P00824759LZ","t":"Construction of Babuyan River Flood Control Strucure Downstream (RS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"AZARRAGA CONSTRUCTION","c":17961569.07,"abc":17963475.0,"fy":"2024","sd":"02/15/2024","cd":"2024-05-23","lat":9.99653,"lon":118.89245,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Babuyan","wn":"Babuyan River","wd":0.05,"wp":[9.9968,118.89281],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1},{"i":1,"cid":"24EG0057","pid":"P00824758LZ","t":"Construction of Flood Control Strucurue along Langogan River Downstream (LS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"AZARRAGA CONSTRUCTION","c":17369992.99,"abc":17370000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-19","lat":9.99761,"lon":118.89251,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Langogan","wn":"Langogan River","wd":22.58,"wp":[10.09708,119.07195],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5,7],"cl":[],"L":"records","s":52,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.8,"value":22.58,"text":"The title names Langogan, which OpenStreetMap maps through the stated municipality, but the pin is 22.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24EG0055 to 24EG0059) cover the same site, together worth PHP 52,109,990.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":164},{"i":2,"cid":"24EG0017","pid":"P00824750LZ","t":"Construction of Babuyan River Flood Control Strucure Upstream (LS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"F.F. GALANG CONSTRUCTION","c":16802607.63,"abc":18335000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-24","lat":9.99671,"lon":118.89323,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Babuyan","wn":"Babuyan River","wd":0.03,"wp":[9.99654,118.893],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2},{"i":3,"cid":"23EG0016","pid":"P00737551LZ","t":"Construction of Flood Control Structure, Barangay Maoyon, Puerto Princesa City, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"PALBIC CONSTRUCTION AND SUPPLY","c":4899590.0,"abc":4900000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-05","lat":10.002658,"lon":118.899702,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maoyon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3},{"i":4,"cid":"24E00127","pid":"P00823565LZ","t":"Construction of Tanabag River Waterway, (Upstream Rightside), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"OCTAGON CONCRETE SOLUTIONS INC. / MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":154395357.9,"abc":154400000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-09-05","lat":9.999043,"lon":118.990177,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Tanabag","wn":"Tanabag River","wd":0.02,"wp":[9.99921,118.99024],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4},{"i":5,"cid":"24EG0055","pid":"P00824756LZ","t":"Construction of Flood Control Strucurue along Langogan River Upstream (LS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"MAINTIN CONSTRUCTION & SUPPLY","c":17369997.4,"abc":17370000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-17","lat":10.02967,"lon":119.12203,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Langogan","wn":"Langogan River","wd":0.02,"wp":[10.02953,119.12198],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1,7],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24EG0055 to 24EG0059) cover the same site, together worth PHP 52,109,990.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":659},{"i":6,"cid":"24EG0056","pid":"P00824757LZ","t":"Construction of Flood Control Strucuruealong Langogan River Upstream (RS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"LOUIESE TRADING AND CONSTRUCTION","c":16120415.26,"abc":17370000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-25","lat":10.02881,"lon":119.12383,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Strucuruealong Langogan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5},{"i":7,"cid":"24EG0059","pid":"P00824760LZ","t":"Construction of Flood Control Strucurue along Langogan River Downstream (RS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"TAGUSAO CONSTRUCTION & TRADING INC. (FORMERLY: TAGUSAO CONSTRUCTION & TRADING)","c":17370000.0,"abc":17370000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-13","lat":10.02751,"lon":119.12416,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Langogan","wn":"Langogan River","wd":0.04,"wp":[10.02762,119.1245],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5,1],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24EG0055 to 24EG0059) cover the same site, together worth PHP 52,109,990.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":660},{"i":8,"cid":"23EE0029","pid":"P00726266LZ","t":"Construction of Magsarongsong Bridge Flood Control Structure, Sta. 0 + 000.00 - Sta. 0 + 084.00, Bank I UPSTREAM (L/S), Sta. 0 + 000.00 - Sta. 0 + 084.00, BANK II UPSTREAM (L/S), Roxas, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ROXAS (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"PANAAD CONSTRUCTION","c":9014282.42,"abc":9064943.69,"fy":"2023","sd":"04/18/2023","cd":"2023-09-12","lat":10.25288,"lon":119.206224,"sm":1224,"fm":1224,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":168.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6},{"i":9,"cid":"24A00250","pid":"P00821520LZ","t":"Construction of Slope Protection along Sinucalan River, Barangay Poblacion Norte, Sta. Barbara, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA BARBARA (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":48248598.38,"abc":48250000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-09-23","lat":16.006788,"lon":120.400763,"sm":1370,"fm":1370,"tm":1370,"am":1370,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":0.03,"wp":[16.00701,120.40091],"wst":"matched","br":"Poblacion Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7},{"i":10,"cid":"24EE0036","pid":"P00820974LZ","t":"Construction of Flood Control Structure along Tulariquin River (RS), Roxas, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Palawan 1st District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / F.F. GALANG CONSTRUCTION","c":48249914.4,"abc":48249976.12,"fy":"2024","sd":"05/20/2024","cd":"2024-12-11","lat":10.147,"lon":119.21562,"sm":1224,"fm":1222,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":"Tulariquin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":806.28,"text":"The record contradicts itself: the title and the pin point to Roxas, Palawan, but the municipality field names Roxas, Isabela, 806 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":528},{"i":11,"cid":"24EE0020","pid":"P00820979LZ","t":"Construction of Slope Protection Structure along Tagumpay Bridge, Roxas, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Palawan 1st District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / SEVEN DIGIT CONSTRUCTION AND TRUCKING SERVICES CORP. (FORMERLY: SEVEN DIGIT CONSTRUCTION & SUPPLIES)","c":44095477.55,"abc":44099975.3,"fy":"2024","sd":"02/14/2024","cd":"2024-10-15","lat":10.27601,"lon":119.22557,"sm":1224,"fm":1222,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":792.38,"text":"The record contradicts itself: the title and the pin point to Roxas, Palawan, but the municipality field names Roxas, Isabela, 792 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":548},{"i":12,"cid":"22EE0036","pid":"P00632934LZ","t":"Construction of Sea Wall, Barangay Caramay, Roxas, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ROXAS (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"A.P. CONSEBIDO CONSTRUCTION AND TRADING","c":4949962.82,"abc":4949962.82,"fy":"2022","sd":"02/17/2022","cd":"2022-07-29","lat":10.183842,"lon":119.231534,"sm":1224,"fm":1224,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caramay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":8},{"i":13,"cid":"24EE0113","pid":"P00844779LZ","t":"Construction/Improvement of Storm Drainage System at Purok Zambales, Brgy. 3, Roxas, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Palawan 1st District Engineering Office","co":"M.G.M. CONSTRUCTION","c":9784647.85,"abc":9899934.12,"fy":"2024","sd":"03/18/2024","cd":"2024-12-20","lat":10.32404,"lon":119.34648,"sm":1224,"fm":1222,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":783.18,"text":"The record contradicts itself: the title and the pin point to Roxas, Palawan, but the municipality field names Roxas, Isabela, 783 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":616},{"i":14,"cid":"24EE0017","pid":"P00820975LZ","t":"Construction of Slope Protection Structure along Iraan Bridge, Roxas, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Palawan 1st District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / SEVEN DIGIT CONSTRUCTION AND TRUCKING SERVICES CORP. (FORMERLY: SEVEN DIGIT CONSTRUCTION & SUPPLIES)","c":44097536.12,"abc":44099956.7,"fy":"2024","sd":"02/14/2024","cd":"2024-10-15","lat":10.42931,"lon":119.37435,"sm":1224,"fm":1222,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":771.14,"text":"The record contradicts itself: the title and the pin point to Roxas, Palawan, but the municipality field names Roxas, Isabela, 771 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":549},{"i":15,"cid":"21EE0101","pid":"P00561401LZ","t":"Construction of Seawall, Brgy. Buenasuerte, El Nido, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"El Nido","deo":"Palawan 1st District Engineering Office","co":"LOUIESE TRADING AND CONSTRUCTION","c":7778048.48,"abc":9899984.53,"fy":"2021","sd":"01/24/2022","cd":"2023-06-25","lat":11.180278,"lon":119.386389,"sm":546,"fm":null,"tm":546,"am":546,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenasuerte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":9},{"i":16,"cid":"24EE0074","pid":"P00820977LZ","t":"Construction of Slope Protection Structure along Lamoro Bridge 1, El Nido, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"EL NIDO (BACUIT) (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) / A.R.L. CONSTRUCTION","c":44097774.54,"abc":44099949.37,"fy":"2024","sd":"02/14/2024","cd":"2024-11-19","lat":11.19344,"lon":119.41688,"sm":546,"fm":546,"tm":546,"am":546,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":10},{"i":17,"cid":"23EE0044","pid":"P00726267LZ","t":"Construction of Lamoro Bridge III Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 080.85, El Nido, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"EL NIDO (BACUIT) (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"12-30 CONSTRUCTION AND SUPPLY","c":8929075.23,"abc":9064950.34,"fy":"2023","sd":"04/18/2023","cd":"2023-12-08","lat":11.243519,"lon":119.430384,"sm":546,"fm":546,"tm":546,"am":546,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":80.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":11},{"i":18,"cid":"23EE0063","pid":"P00742461LZ","t":"Construction of Drainage System, Tumarbong, Roxas, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ROXAS (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"AFG CONSTRUCTION CORPORATION","c":4514354.14,"abc":4949974.91,"fy":"2023","sd":"03/30/2023","cd":"2023-06-29","lat":10.379389,"lon":119.461795,"sm":1224,"fm":1224,"tm":1224,"am":1224,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":12},{"i":19,"cid":"24EE0101","pid":"P00820972LZ","t":"Construction of Abongan CIS Drainage Canal, Taytay, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Palawan 1st District Engineering Office","co":"REINASTAR TRADING AND CONSTRUCTION SUPPLY","c":19598517.1,"abc":19599983.05,"fy":"2024","sd":"02/14/2024","cd":"2024-10-28","lat":10.68633,"lon":119.46259,"sm":1557,"fm":1556,"tm":1557,"am":1557,"md":0.0,"ls":"inside","ww":"Abongan CIS Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":460.01,"text":"The record contradicts itself: the title and the pin point to Taytay, Palawan, but the municipality field names Taytay, Rizal, 460 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":596},{"i":20,"cid":"23EE0027","pid":"P00726264LZ","t":"Construction of Bato Bridge Flood Control Structure, Taytay, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"TAYTAY (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":9064029.8,"abc":9064927.16,"fy":"2023","sd":"03/15/2023","cd":"2023-10-23","lat":10.717258,"lon":119.493683,"sm":1557,"fm":1557,"tm":1557,"am":1557,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":13},{"i":21,"cid":"24EE0055","pid":"P00820412LZ","t":"Construction of Slope Protection Structure along Balite Bridge, Taytay, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Palawan 1st District Engineering Office","co":"JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":96499967.12,"abc":96499945.21,"fy":"2024","sd":"02/14/2024","cd":"2024-08-27","lat":10.64284,"lon":119.496278,"sm":1557,"fm":1556,"tm":1557,"am":1557,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":463.05,"text":"The record contradicts itself: the title and the pin point to Taytay, Palawan, but the municipality field names Taytay, Rizal, 463 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":445},{"i":22,"cid":"24EE0054","pid":"P00820414LZ","t":"Construction of Slope Protection Structure along Talog Bridge, Taytay, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Palawan 1st District Engineering Office","co":"JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":96499998.63,"abc":96499980.15,"fy":"2024","sd":"02/14/2024","cd":"2024-09-20","lat":10.64781,"lon":119.50026,"sm":1557,"fm":1556,"tm":1557,"am":1557,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":462.38,"text":"The record contradicts itself: the title and the pin point to Taytay, Palawan, but the municipality field names Taytay, Rizal, 462 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":446},{"i":23,"cid":"24AG0137","pid":"P00843194LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+180 - Sta. 000+610, Barangay Boboy, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES / RANIA CONSTRUCTION AND SUPPLIES","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-09-25","lat":16.132714,"lon":119.778189,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.11,"wp":[16.13182,119.77872],"wst":"matched","br":"Boboy","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":14},{"i":24,"cid":"24AG0138","pid":"P00843195LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+610 - Sta. 001+040, Barangay Boboy, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"RANIA CONSTRUCTION AND SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-09-25","lat":16.134808,"lon":119.781525,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.08,"wp":[16.13425,119.78201],"wst":"matched","br":"Boboy","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":15},{"i":25,"cid":"23AG0024","pid":"P00726326LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002+019.5 - Sta. 002+536.1, Barangay Aloleng, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"SAMANTHA ENTERPRISES / ALCEL CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-12-07","lat":16.128232,"lon":119.787802,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.13,"wp":[16.1283,119.78904],"wst":"matched","br":"Aloleng","len":516.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":16},{"i":26,"cid":"24AG0017","pid":"P00820714LZ","t":"Construction of Flood Mitigation Facilities along Balingcaguing River (Aloleng Section), Sta. 002+059 - Sta. 002+303, Barangay Aloleng, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-05-03","lat":16.131694,"lon":119.787876,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.1,"wp":[16.13176,119.78882],"wst":"matched","br":"Aloleng","len":244.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":17},{"i":27,"cid":"24AG0112","pid":"P00820122LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002 + 896.6 - Sta. 003 + 296.6, Barangay Aloleng, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"SAMANTHA ENTERPRISES / ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-12-17","lat":16.128254,"lon":119.788113,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.1,"wp":[16.1283,119.78904],"wst":"matched","br":"Aloleng","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":18},{"i":28,"cid":"24AG0015","pid":"P00820127LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+848 - Sta. 002+278, Barangay Poblacion West, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-08-27","lat":16.128628,"lon":119.78954,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.06,"wp":[16.1286,119.78902],"wst":"matched","br":"Poblacion West","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":19},{"i":29,"cid":"24AG0014","pid":"P00820126LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+418 - Sta. 001+848, Barangay Poblacion West, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"RAMDC CONSTRUCTION AND TRADING / ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2025-01-09","lat":16.124765,"lon":119.790688,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.05,"wp":[16.12454,119.79029],"wst":"matched","br":"Poblacion West","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":20},{"i":30,"cid":"23AG0028","pid":"P00726365LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section) Sta. 001+900-Sta. 002+680, barangay Poblacion West, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":51145000.0,"abc":51145000.0,"fy":"2023","sd":"04/13/2023","cd":"2024-01-05","lat":16.121518,"lon":119.792725,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.05,"wp":[16.12129,119.79233],"wst":"matched","br":"Poblacion West","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":21},{"i":31,"cid":"24AG0018","pid":"P00820715LZ","t":"Construction of Flood Mitigation Facilities along Balingcaguing River (Poblacion East Section), Sta. 003+436 - Sta. 003+680, Barangay Poblacion East, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-10-16","lat":16.113559,"lon":119.799836,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.06,"wp":[16.11319,119.79948],"wst":"matched","br":"Poblacion East","len":244.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":22},{"i":32,"cid":"23AG0029","pid":"P00726328LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River, Sta. 004+564.2 - Sta. 005+073.8, Barangay Poblacion East, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-12-22","lat":16.111824,"lon":119.801599,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.05,"wp":[16.11149,119.80124],"wst":"matched","br":"Poblacion East","len":509.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":23},{"i":33,"cid":"24AG0012","pid":"P00820123LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Bangan-Oda Section), Sta. 007+850 - Sta. 008+250, Barangay Bangan-Oda, Agno, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGNO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2025-03-03","lat":16.108686,"lon":119.829299,"sm":8,"fm":8,"tm":8,"am":8,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.07,"wp":[16.10824,119.82882],"wst":"matched","br":"Bangan-Oda","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":24},{"i":34,"cid":"22AG0022","pid":"P00631082LZ","t":"Construction of Flood Control Structure, Brgy. Hermosa, Dasol, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DASOL (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"BERSON'S CONSTRUCTION & TRADING","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-12-26","lat":15.941711,"lon":119.865492,"sm":487,"fm":487,"tm":487,"am":487,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hermosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":25},{"i":35,"cid":"24AG0013","pid":"P00820124LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017+829 - Sta. 018+229, Barangay Caranglaan, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-04-23","lat":16.0883,"lon":119.8757,"sm":842,"fm":842,"tm":842,"am":261,"md":0.91,"ls":"boundary","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.84,"wp":[16.08158,119.87209],"wst":"matched","br":"Caranglaan","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":26},{"i":36,"cid":"23EE0030","pid":"P00726265LZ","t":"Construction of Buluang Bridge I Flood Control Structure, Sta. 0 + 044.64 - Sta. 0 + 095.00 (UPSTREAM - BK.I), Sta. 0 + 000 - Sta. 0 + 095.00 (UPSTREAM - BK. II), Sta. 0 + 000.00 - Sta. 0 + 026.00 (DOWNSTREASM - BK. II), Busuanga, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BUSUANGA (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":8884656.0,"abc":9064955.46,"fy":"2023","sd":"04/18/2023","cd":"2023-08-11","lat":12.221611,"lon":119.877454,"sm":266,"fm":266,"tm":266,"am":266,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":171.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":27},{"i":37,"cid":"24AG0113","pid":"P00823306LZ","t":"Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+092 - Sta. 017+457, Caranglaan, Mabini, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/19/2024","cd":"2025-02-12","lat":16.082542,"lon":119.886445,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.03,"wp":[16.08227,119.88654],"wst":"matched","br":null,"len":365.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":28},{"i":38,"cid":"24AG0102","pid":"P00823307LZ","t":"Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+457 - Sta. 017+822, Caranglaan, Mabini, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-12-28","lat":16.081463,"lon":119.889496,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.02,"wp":[16.08132,119.88936],"wst":"matched","br":null,"len":365.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":29},{"i":39,"cid":"24AG0022","pid":"P00821091LZ","t":"Construction of Flood Control along Balingcaguing River, Barangay Anapao, Burgos, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BURGOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":72686685.0,"abc":72686695.0,"fy":"2024","sd":"02/12/2024","cd":"2024-04-29","lat":16.079879,"lon":119.890938,"sm":261,"fm":261,"tm":261,"am":842,"md":0.04,"ls":"boundary","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.02,"wp":[16.0798,119.89078],"wst":"matched","br":"Anapao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":30},{"i":40,"cid":"23AG0025","pid":"P00726363LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017 + 822 - Sta. 018 + 602, Barangay Caranglaan, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":52809625.0,"abc":53075000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-05-29","lat":16.076452,"lon":119.892779,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.02,"wp":[16.07633,119.8926],"wst":"matched","br":"Caranglaan","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":31},{"i":41,"cid":"22AG0017","pid":"P00620955LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Tambacan Section) Sta.018+674 - Sta.019+323, Brgy. Tambacan, Burgos, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BURGOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-12","lat":16.075354,"lon":119.894204,"sm":261,"fm":261,"tm":261,"am":842,"md":0.08,"ls":"boundary","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.07,"wp":[16.07496,119.89367],"wst":"matched","br":"Tambacan","len":649.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":32},{"i":42,"cid":"23AG0031","pid":"P00726330LZ","t":"Construction of Flood Mitigation Structure along Bayambang River, Sta. 000+500 - Sta. 001+013.1, R/S, Barangay Bayambang, Infanta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"INFANTA (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-09-26","lat":15.88173,"lon":119.897591,"sm":642,"fm":642,"tm":642,"am":642,"md":0.0,"ls":"inside","ww":"Bayambang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bayambang","len":513.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":33},{"i":43,"cid":"23CL0093","pid":"P00727153LZ","t":"Construction of Gama River Flood Control Structure, Package 1, Sta. Cruz, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":48117246.7,"abc":48999232.94,"fy":"2023","sd":"04/19/2023","cd":"2024-01-22","lat":15.784678,"lon":119.910846,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Gama","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":34},{"i":44,"cid":"24CL0123","pid":"P00824717LZ","t":"Construction of Gama River Slope Protection/ Flood Control Structure Phase 3, Sta. Cruz, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":47694698.0,"abc":48249239.42,"fy":"2024","sd":"02/15/2024","cd":"2024-04-15","lat":15.788027,"lon":119.910956,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Gama","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":35},{"i":45,"cid":"24CL0122","pid":"P00824716LZ","t":"Construction of Gama River Slope Protection/ Flood Control Structure Phase 2, Sta. Cruz, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":47695117.0,"abc":48249959.91,"fy":"2024","sd":"02/15/2024","cd":"2024-04-15","lat":15.788168,"lon":119.911072,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Gama","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":36},{"i":46,"cid":"22CL0071","pid":"P00640535LZ","t":"Construction of Flood Mitigation Structure, Bayto River (Upstream North Approach), Sta. Cruz, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"BIG BERTHA CONSTRUCTION & DEVELOPMENT","c":29698817.29,"abc":29392945.08,"fy":"2022","sd":"04/04/2022","cd":"2022-09-14","lat":15.722124,"lon":119.911692,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Bayto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01041,"text":"Contract cost is 1.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":866},{"i":47,"cid":"23CL0131","pid":"P00740644LZ","t":"Construction of Drainage System, Maestre St., Brgy. Poblacion, Sta. Cruz, Zambales","w":"Construction of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"GASAT BUILDERS AND SUPPLIES INC.","c":19266907.03,"abc":19599664.01,"fy":"2023","sd":"05/29/2023","cd":"2023-11-20","lat":15.761437,"lon":119.914663,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":37},{"i":48,"cid":"22CL0017","pid":"P00631277LZ","t":"Construction of Line Canal, Barangay Libertador, Candelaria, Zambales","w":"Construction of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"JAM-C BUILDERS","c":9506441.08,"abc":9800000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-07-25","lat":15.622302,"lon":119.915881,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Libertador","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":38},{"i":49,"cid":"23AG0032","pid":"P00726327LZ","t":"Construction of Flood Mitigation Structure along Nayom River, Sta. 005+775.6 - Sta. 006+285.2, Barangay Maya, Infanta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"INFANTA (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-12-19","lat":15.816277,"lon":119.923106,"sm":642,"fm":642,"tm":642,"am":642,"md":0.0,"ls":"inside","ww":"Nayom","wn":"Nayom River","wd":0.05,"wp":[15.81586,119.92317],"wst":"matched","br":"Maya","len":509.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":39},{"i":50,"cid":"24AG0139","pid":"P00843196LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 025+700 - Sta. 026+130, Barangay Calzada, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2025-01-31","lat":16.078171,"lon":119.926663,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.02,"wp":[16.07804,119.92648],"wst":"matched","br":"Calzada","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":40},{"i":51,"cid":"24AG0091","pid":"P00824834LZ","t":"Construction of Slope Protection Structure along Nayom River, Sta.006+285.2 - Sta. 006+922.2, Maya, lnfanta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"INFANTA (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-06","lat":15.807302,"lon":119.928258,"sm":642,"fm":642,"tm":null,"am":642,"md":0.0,"ls":"inside","ww":"Nayom","wn":"Nayom River","wd":0.04,"wp":[15.80695,119.92838],"wst":"matched","br":null,"len":637.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":41},{"i":52,"cid":"24AG0140","pid":"P00843197LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 026+130 - Sta. 026+560, Barangay Calzada, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/19/2024","cd":"2025-02-12","lat":16.075554,"lon":119.929609,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.03,"wp":[16.07536,119.92946],"wst":"matched","br":"Calzada","len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":42},{"i":53,"cid":"24AG0093","pid":"P00824835LZ","t":"Construction of Slope Protection Structure along Nayom River, Sta.006+922.2 - Sta. 007+559.2, Maya, lnfanta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"INFANTA (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-12-18","lat":15.810125,"lon":119.933349,"sm":642,"fm":642,"tm":null,"am":642,"md":0.0,"ls":"inside","ww":"Nayom","wn":"Nayom River","wd":0.04,"wp":[15.80986,119.9336],"wst":"matched","br":null,"len":637.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":43},{"i":54,"cid":"24AG0136","pid":"P00843180LZ","t":"Construction of Bank Slope Protection along Nayom River, Sta. 007+559.2 - Sta. 008+159.2, Barangay Maya, Infanta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"INFANTA (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/12/2024","cd":"2025-02-05","lat":15.81281,"lon":119.938083,"sm":642,"fm":642,"tm":642,"am":642,"md":0.0,"ls":"inside","ww":"Nayom","wn":"Nayom River","wd":0.04,"wp":[15.81254,119.93787],"wst":"matched","br":"Maya","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":44},{"i":55,"cid":"23AG0027","pid":"P00726364LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027 + 420 - Sta. 028 + 200, Barangay Poblacion, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-24","lat":16.068056,"lon":119.940066,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.05,"wp":[16.06766,119.93989],"wst":"matched","br":"Poblacion","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":45},{"i":56,"cid":"24AG0023","pid":"P00821105LZ","t":"Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027+880 - Sta. 028+203, Barangay Poblacion, Mabini, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MABINI (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"BERSON'S CONSTRUCTION & TRADING","c":72687660.0,"abc":72687660.0,"fy":"2024","sd":"02/12/2024","cd":"2025-01-20","lat":16.058989,"lon":119.94275,"sm":842,"fm":842,"tm":842,"am":842,"md":0.0,"ls":"inside","ww":"Balingcaguing","wn":"Balingcaging River","wd":0.04,"wp":[16.05921,119.94248],"wst":"matched","br":"Poblacion","len":323.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":46},{"i":57,"cid":"24AG0019","pid":"P00820716LZ","t":"Construction of Flood Mitigation Facilities, Alaminos River (Palamis Section), Sta. 016+340 - Sta. 016+584, Barangay Palamis, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-04-11","lat":16.140739,"lon":119.947081,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":2.34,"wp":[16.15244,119.96526],"wst":"matched","br":"Palamis","len":244.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":47},{"i":58,"cid":"23CL0074","pid":"P00727154LZ","t":"Construction of Marangla River Flood Control Structure, Package 1, Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":48995000.77,"abc":48999487.57,"fy":"2023","sd":"04/14/2023","cd":"2023-11-22","lat":15.38565,"lon":119.961637,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Marangla","wn":"Marangla River","wd":0.03,"wp":[15.38583,119.96137],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":48},{"i":59,"cid":"22CL0057","pid":"P00630935LZ","t":"Construction of Slope Protection along Olongapo-Bugallon Road, Pangolingan Section (Phase 3), Palauig, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"PALAUIG (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":96498232.03,"abc":96494951.88,"fy":"2022","sd":"04/04/2022","cd":"2023-03-23","lat":15.475036,"lon":119.961721,"sm":1067,"fm":1067,"tm":1067,"am":946,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":49},{"i":60,"cid":"22CL0018","pid":"P00630936LZ","t":"Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 3), Palauig, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"PALAUIG (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":96482482.65,"abc":96499280.08,"fy":"2022","sd":"03/23/2022","cd":"2023-02-17","lat":15.470612,"lon":119.963464,"sm":1067,"fm":1067,"tm":1067,"am":1067,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":50},{"i":61,"cid":"22CL0019","pid":"P00630937LZ","t":"Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 4), Palauig, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"PALAUIG (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91669651.44,"abc":96494369.21,"fy":"2022","sd":"03/23/2022","cd":"2023-03-20","lat":15.47062,"lon":119.963464,"sm":1067,"fm":1067,"tm":1067,"am":1067,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":51},{"i":62,"cid":"21CL0091","pid":"P00526066LZ","t":"Construction/Rehabilitation/Improvement of Slope Protection along Olongapo - Bugallon Road, Pangolingan Section (Phase 2), Palauig, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"Palauig","deo":"Zambales 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":46794299.56,"abc":48999266.55,"fy":"2021","sd":"04/27/2022","cd":"2022-12-05","lat":15.469899,"lon":119.963824,"sm":1067,"fm":null,"tm":1067,"am":1067,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":52},{"i":63,"cid":"24CL0120","pid":"P00824714LZ","t":"Construction of Guisguis Flood Control at Nayum River, Brgy. Guisguis, Sta. Cruz, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":47670294.0,"abc":48249028.28,"fy":"2024","sd":"02/15/2024","cd":"2024-04-15","lat":15.806961,"lon":119.967118,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Nayum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guisguis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":53},{"i":64,"cid":"24AG0116","pid":"P00824799LZ","t":"Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+886 - Sta. 010+425, Barangay Jose, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2025-02-01","lat":16.170863,"lon":119.968266,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.17101,119.96847],"wst":"matched","br":"Jose","len":539.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":54},{"i":65,"cid":"24AG0011","pid":"P00820121LZ","t":"Construction of Flood Mitigation Structure along Alaminos River , Sta. 009+772.9 - Sta. 010+172.9, Barangay Cayucay, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-12-03","lat":16.17243,"lon":119.968294,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.17247,119.96804],"wst":"matched","br":"Cayucay","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":55},{"i":66,"cid":"25AG0078","pid":"P00941153LZ","t":"Rehabilitation of Flood Mitigation Structure, Barangay Telbang, Alaminos City, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"GED CONSTRUCTION","c":4850385.71,"abc":4950000.0,"fy":"2025","sd":"02/21/2025","cd":"2025-05-14","lat":16.096847,"lon":119.969155,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Telbang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":56},{"i":67,"cid":"24AG0115","pid":"P00824798LZ","t":"Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+347 - Sta. 009+886, Barangay Jose, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2025-02-01","lat":16.173912,"lon":119.970262,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.17365,119.9703],"wst":"matched","br":"Jose","len":539.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":57},{"i":68,"cid":"22AG0013","pid":"P00620792LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Palamis Section) Sta.015+259 - Sta.015+979, Brgy. Palamis, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S) / JONIK TRADING & CONSTRUCTION","c":66585000.0,"abc":66585000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-10-14","lat":16.142784,"lon":119.971094,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.02,"wp":[16.14292,119.97125],"wst":"matched","br":"Palamis","len":720.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":58},{"i":69,"cid":"24AG0092","pid":"P00823305LZ","t":"Construction of Slope Protection Structure along Alaminos River, Sta.009+372.9 - Sta. 009+772.9, Cayucay, Alaminos City, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-12-18","lat":16.17346,"lon":119.971324,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.02,"wp":[16.17368,119.97133],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":59},{"i":70,"cid":"23AG0023","pid":"P00726332LZ","t":"Construction of Flood Mitigation Structure along Alaminos River, Sta. 010+172.9 - Sta. 010+702.8, Barangay Poblacion to Cayucay, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"04/13/2023","cd":"2024-02-08","lat":16.170454,"lon":119.971464,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.01,"wp":[16.17035,119.97146],"wst":"matched","br":"Poblacion","len":529.9,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":60},{"i":71,"cid":"22AG0015","pid":"P00620794LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Pogo Section) Sta.010+362 - Sta.011+082, Brgy. Pogo, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING","c":66585000.0,"abc":66585000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-08-30","lat":16.167279,"lon":119.971992,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.16706,119.97207],"wst":"matched","br":"Pogo","len":720.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":61},{"i":72,"cid":"22AG0014","pid":"P00620793LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section) Sta.011+058 - Sta.011+778, Brgy. Poblacion, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY","c":66971000.0,"abc":66971000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-25","lat":16.16733,"lon":119.972413,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.02,"wp":[16.16714,119.97245],"wst":"matched","br":"Poblacion","len":720.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":62},{"i":73,"cid":"24AG0010","pid":"P00820120LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 010+525 - Sta. 010+925, Barangay Pogo, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-17","lat":16.169862,"lon":119.9734,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.17007,119.9735],"wst":"matched","br":"Pogo","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":63},{"i":74,"cid":"23AG0022","pid":"P00726361LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 009 + 912 - Sta. 010 + 692, Barangay Pogo, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-05-22","lat":16.167831,"lon":119.975323,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.16799,119.97557],"wst":"matched","br":"Pogo","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":64},{"i":75,"cid":"23AG0021","pid":"P00726362LZ","t":"Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section), Sta. 010 + 621 - Sta. 011 + 401, Barangay Poblacion, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/13/2023","cd":"2024-02-05","lat":16.166815,"lon":119.975441,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.16703,119.97531],"wst":"matched","br":"Poblacion","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":65},{"i":76,"cid":"22AG0018","pid":"P00620954LZ","t":"Construction of Flood Mitigation Structure along Alaminos River, Palamis Section, Sta. 015+979 - Sta. 016+495, Alaminos, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-04","lat":16.138594,"lon":119.975694,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.14,"wp":[16.13889,119.97445],"wst":"matched","br":null,"len":516.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":66},{"i":77,"cid":"24AG0114","pid":"P00824797LZ","t":"Construction of Bank Slope Protection along Alaminos River, Sta. 008+572.9 - Sta. 008+972.9, Barangay Cayucay, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/12/2024","cd":"2025-01-26","lat":16.177186,"lon":119.976198,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.03,"wp":[16.17722,119.97596],"wst":"matched","br":"Cayucay","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":67},{"i":78,"cid":"23CL0070","pid":"P00742162LZ","t":"Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 1)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"DMLC BUILDERS","c":98009377.11,"abc":98999412.33,"fy":"2023","sd":"04/14/2023","cd":"2023-11-22","lat":15.586431,"lon":119.979884,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":68},{"i":79,"cid":"23CL0071","pid":"P00742147LZ","t":"Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 2)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"DMLC BUILDERS","c":98999501.03,"abc":98999606.49,"fy":"2023","sd":"04/14/2023","cd":"2023-11-22","lat":15.586438,"lon":119.979884,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":69},{"i":80,"cid":"24CL0121","pid":"P00824715LZ","t":"Construction of Guinabon Flood Control at Nayum River, Brgy. Guinabon, Sta. Cruz, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SANTA CRUZ (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":47669194.0,"abc":48248273.33,"fy":"2024","sd":"02/15/2024","cd":"2024-04-15","lat":15.809271,"lon":119.984052,"sm":1375,"fm":1375,"tm":1375,"am":1375,"md":0.0,"ls":"inside","ww":"Nayum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guinabon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":70},{"i":81,"cid":"23CL0072","pid":"P00742148LZ","t":"Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 3)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":98999273.23,"abc":98999633.54,"fy":"2023","sd":"04/14/2023","cd":"2023-11-22","lat":15.594575,"lon":119.988579,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":71},{"i":82,"cid":"23CL0073","pid":"P00742149LZ","t":"Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 4)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":98999798.68,"abc":98999994.92,"fy":"2023","sd":"04/14/2023","cd":"2023-11-22","lat":15.594505,"lon":119.990359,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":72},{"i":83,"cid":"23CL0083","pid":"P00742381LZ","t":"Construction of Slope Protection at Lawis River Upstream, Candelaria, Zambales (Phase 2)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CANDELARIA (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":98999580.83,"abc":98999766.65,"fy":"2023","sd":"04/17/2023","cd":"2023-11-22","lat":15.593231,"lon":119.993756,"sm":319,"fm":319,"tm":319,"am":319,"md":0.0,"ls":"inside","ww":"Lawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":73},{"i":84,"cid":"22CL0004","pid":"P00620187LZ","t":"Construction of Slope Protection/Sea Wall, Brgy. Bangan, Botolan, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":69009815.77,"abc":72261600.37,"fy":"2022","sd":"02/23/2022","cd":"2022-07-18","lat":15.275352,"lon":120.007582,"sm":230,"fm":230,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":74},{"i":85,"cid":"22CL0079","pid":"P00640537LZ","t":"Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase III, Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":37620000.0,"abc":37230435.15,"fy":"2022","sd":"04/04/2022","cd":"2022-09-27","lat":15.332465,"lon":120.008196,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Tambak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[86,91],"cl":[],"L":"field","s":47,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CL0079 to 22CL0081) cover the same site, together worth PHP 124,740,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01046,"text":"Contract cost is 1.05% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":113},{"i":86,"cid":"22CL0080","pid":"P00640538LZ","t":"Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase IV, Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":37620000.0,"abc":37235289.06,"fy":"2022","sd":"04/04/2022","cd":"2022-09-26","lat":15.334361,"lon":120.008643,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Tambak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[85,91],"cl":[],"L":"field","s":47,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CL0079 to 22CL0081) cover the same site, together worth PHP 124,740,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01033,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":114},{"i":87,"cid":"24AG0016","pid":"P00820713LZ","t":"Construction of Flood Mitigation Facilities along Alaminos River (Barangay Cabatuan - Victoria Section), Sta. 024+385 - Sta. 024+629, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ALCEL CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-07-18","lat":16.115065,"lon":120.008678,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":"Alaminos","wn":"Alaminos River","wd":0.01,"wp":[16.11498,120.00873],"wst":"matched","br":"Cabatuan","len":244.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":75},{"i":88,"cid":"24CL0127","pid":"P00844770LZ","t":"Construction of Flood Control Structure along Bancal-San Isidro-Mambog River (Totun Lanum) Phase 3, Sitio Tambak, (North Side), Barangay Palanginan, Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":47579211.86,"abc":48249885.77,"fy":"2024","sd":"02/22/2024","cd":"2024-11-13","lat":15.319846,"lon":120.008689,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Bancal-San Isidro-Mambog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Palanginan","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":76},{"i":89,"cid":"24AG0021","pid":"P00843215LZ","t":"Construction of Flood Control Structure, Brgy. Lucap, Alaminos City, Pangasinan (Package II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"ORIENTAL SALES CENTER AND CONTRACTOR / ALCEL CONSTRUCTION","c":96491365.52,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2025-03-03","lat":16.182669,"lon":120.008813,"sm":364,"fm":364,"tm":364,"am":364,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lucap","len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":77},{"i":90,"cid":"22CL0073","pid":"P00640536LZ","t":"Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase II, Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":39303000.0,"abc":38903735.02,"fy":"2022","sd":"04/04/2022","cd":"2022-09-28","lat":15.330417,"lon":120.009491,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Tambak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01026,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":823},{"i":91,"cid":"22CL0081","pid":"P00640540LZ","t":"Construction of Slope Protection/Flood Control Structure along Tambak River (Upstream), Phase 6, Iba, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":49500000.0,"abc":48996495.64,"fy":"2022","sd":"04/04/2022","cd":"2022-12-12","lat":15.333914,"lon":120.010577,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Tambak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[85,86],"cl":[],"L":"field","s":53,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CL0079 to 22CL0081) cover the same site, together worth PHP 124,740,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01028,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":82},{"i":92,"cid":"22CL0072","pid":"P00640539LZ","t":"Construction of Flood Mitigation Structure,Tambak River (Upstream), Iba, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"IBA (CAPITAL) (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":39303000.0,"abc":38903704.46,"fy":"2022","sd":"04/04/2022","cd":"2022-09-28","lat":15.327896,"lon":120.011307,"sm":627,"fm":627,"tm":627,"am":627,"md":0.0,"ls":"inside","ww":"Tambak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01026,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":824},{"i":93,"cid":"23C00072","pid":"P00725703LZ","t":"Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"NICLEDON CONSTRUCTION / GRACE CONSTRUCTION CORPORATION","c":96499292.34,"abc":96499311.36,"fy":"2023","sd":"06/20/2023","cd":"2023-12-16","lat":15.269167,"lon":120.015853,"sm":230,"fm":230,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":"Bucao","wn":"Bucao River","wd":0.77,"wp":[15.26227,120.01647],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":78},{"i":94,"cid":"23CL0081","pid":"P00740643LZ","t":"Construction of Flood Control along Batonlapoc Creek, Batonlapoc, Botolan, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION)","c":28870422.99,"abc":29399608.39,"fy":"2023","sd":"04/17/2023","cd":"2023-12-07","lat":15.290068,"lon":120.028599,"sm":230,"fm":230,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":"Batonlapoc","wn":"Batonlapoc Creek","wd":0.01,"wp":[15.29016,120.02858],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":79},{"i":95,"cid":"23CL0024","pid":"P00726748LZ","t":"Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":48998700.23,"abc":48999304.04,"fy":"2023","sd":"02/22/2023","cd":"2023-11-22","lat":15.2656,"lon":120.03,"sm":230,"fm":230,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":"Bucao","wn":"Bucao River","wd":0.2,"wp":[15.26381,120.03029],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":466},{"i":96,"cid":"23A00281","pid":"P00726837LZ","t":"Construction of Riverbank Protection along Sinucalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":106150000.0,"abc":106150000.0,"fy":"2023","sd":"05/09/2023","cd":"2024-02-02","lat":16.034463,"lon":120.034463,"sm":475,"fm":475,"tm":475,"am":1482,"md":29.27,"ls":"outside","ww":"Sinucalan","wn":"Sinocalan River","wd":37.26,"wp":[16.00078,120.38057],"wst":"matched","br":"Bacayao Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":62,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.99,"value":29.27,"text":"The pin is 29.3 km outside Dagupan City, Pangasinan, the nearest municipality the record claims. It falls in Sual, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":82},{"i":97,"cid":"22CL0043","pid":"P00620555LZ","t":"Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":47039334.54,"abc":48999306.81,"fy":"2022","sd":"03/16/2022","cd":"2022-09-28","lat":15.269232,"lon":120.040069,"sm":230,"fm":230,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":"Bucao","wn":"Bucao River","wd":0.54,"wp":[15.26447,120.03919],"wst":"matched","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":80},{"i":98,"cid":"22CD0047","pid":"P00620523LZ","t":"Construction of Flood Control Structure along Bulo River, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":46031419.24,"abc":46059437.96,"fy":"2022","sd":"02/28/2022","cd":"2022-09-11","lat":15.24101,"lon":120.04711,"sm":1330,"fm":1330,"tm":1330,"am":230,"md":93.64,"ls":"outside","ww":"Bulo","wn":"Ilog Bulo River","wd":97.64,"wp":[15.17964,120.95322],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":67,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":93.64,"text":"The pin is 93.6 km outside San Miguel, Bulacan, the nearest municipality the record claims. It falls in Botolan, Zambales.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":97.64,"text":"The title names Bulo, which OpenStreetMap maps through the stated municipality, but the pin is 97.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":58},{"i":99,"cid":"23CL0138","pid":"P00742377LZ","t":"Construction of Slope Protection Structure (Upstream L/S) along the highway going to Olongapo, Barangay Banuanbayo, Cabangan, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"CABANGAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"KAEE CONSTRUCTION SERVICES","c":5850198.15,"abc":5939285.37,"fy":"2023","sd":"05/31/2023","cd":"2023-10-23","lat":15.156488,"lon":120.055051,"sm":273,"fm":273,"tm":273,"am":273,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banuanbayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":81},{"i":100,"cid":"21CL0092","pid":"P00561720LZ","t":"Construction of Slope Protection/Flood Control, Brgy. Poonbato, Municipality of Botolan, Province of Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"Botolan","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":24750000.0,"abc":24499951.53,"fy":"2021","sd":"01/10/2022","cd":"2022-07-11","lat":15.313149,"lon":120.056073,"sm":230,"fm":null,"tm":230,"am":230,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poonbato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01021,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":892},{"i":101,"cid":"21EB0120","pid":"P00561574LZ","t":"Construction of River Protection along Pula River, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Paluan","deo":"Mindoro Occidental District Engineering Office","co":"NEW MINDORENOS LUMBER, HARDWARE AND GEN MERCHANDISE","c":19042647.14,"abc":19600000.0,"fy":"2021","sd":"09/23/2021","cd":"2023-05-29","lat":13.416389,"lon":120.40111,"sm":1072,"fm":null,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":82},{"i":102,"cid":"23CJ0141","pid":"P00742373LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation and Road Component Along Camiling River Left Bank, Anoling 3rd to Pao 1st Section, Camiling, Tarlac (Package G)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48050158.9,"abc":49500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-09-13","lat":15.655183,"lon":120.401175,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Road Component Along Camiling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package G","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":83},{"i":103,"cid":"22A00209","pid":"P00630929LZ","t":"Construction of Slope Protection, Barangays Embarcadero, Macayug, Inlambo, Navaluan, Osiem and Landas, Mangaldan, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-03","lat":16.065,"lon":120.4012,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Embarcadero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":84},{"i":104,"cid":"23AE0041","pid":"P00742271LZ","t":"Construction of Flood Control Structure at Brgy. Antonino, Balaoan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BALAOAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"PAGTAENGAN BUILDERS AND CONCRETE PRODUCTS","c":9799384.97,"abc":9799975.97,"fy":"2023","sd":"05/24/2023","cd":"2023-06-26","lat":16.818711,"lon":120.401534,"sm":121,"fm":121,"tm":121,"am":121,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Antonino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":85},{"i":105,"cid":"24AF0012","pid":"P00821475LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Tubao, La Union (Package 8)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":48926107.83,"abc":48999995.52,"fy":"2024","sd":"02/02/2024","cd":"2025-03-17","lat":16.367985,"lon":120.401734,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.68,"wp":[16.36407,120.40667],"wst":"matched","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":86},{"i":106,"cid":"24A00278","pid":"P00824807LZ","t":"Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN GABRIEL (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":154399996.8,"abc":154400000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-04-15","lat":16.665165,"lon":120.402042,"sm":1281,"fm":1281,"tm":1281,"am":1281,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.22,"wp":[16.66333,120.40134],"wst":"matched","br":"Bucao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":87},{"i":107,"cid":"23AF0112","pid":"P00727245LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 6)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":72334997.36,"abc":72374997.36,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.366497,"lon":120.402162,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.54,"wp":[16.36339,120.40609],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[863,867,873,886,895,501,504,118,123,117,108,109,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":376},{"i":108,"cid":"23AF0110","pid":"P00727243LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 4)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":72334995.83,"abc":72374995.83,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.370192,"lon":120.402272,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.79,"wp":[16.36578,120.40808],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[863,867,873,886,895,501,504,118,123,117,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":377},{"i":109,"cid":"23AF0111","pid":"P00727244LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 5)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":72334992.2,"abc":72374992.2,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.370253,"lon":120.402303,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.79,"wp":[16.36583,120.40813],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[863,867,873,886,895,501,504,118,123,117,108,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":378},{"i":110,"cid":"24AH0056","pid":"P00839554LZ","t":"Construction of Drainage System at Barangay Bari, Mangaldan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-05-18","lat":16.059806,"lon":120.403223,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bari","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":88},{"i":111,"cid":"22C00084","pid":"P00621287LZ","t":"Construction of Camiling-Agno River Floodway, Tarlac, Phase 4","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) / ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":289499994.8,"abc":289499110.9,"fy":"2022","sd":"07/25/2022","cd":"2024-09-01","lat":15.740944,"lon":120.403308,"sm":315,"fm":315,"tm":432,"am":315,"md":0.0,"ls":"inside","ww":"Camiling-Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.66,"text":"The record contradicts itself: the municipality field and the pin point to Camiling, Tarlac, but the title names City of Tarlac, Tarlac, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":407},{"i":112,"cid":"24AE0019","pid":"P00820103LZ","t":"Construction of Flood Control Mitigation Structure along Barangay Bumbuneg-Baroro, San Gabriel, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN GABRIEL (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":82971487.54,"abc":84262347.69,"fy":"2024","sd":"02/14/2024","cd":"2024-10-25","lat":16.671665,"lon":120.403312,"sm":1281,"fm":1281,"tm":1281,"am":1281,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bumbuneg-Baroro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":89},{"i":113,"cid":"22AF0031","pid":"P00631073LZ","t":"Construction of Flood Control Mitigation Structures Along Bauang River Basin, (Brgy. Nagrebcan, Bauang), (Brgy. Mamat-Ing Sur, Naguilian), La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":7693165.65,"abc":7839996.91,"fy":"2022","sd":"02/22/2022","cd":"2022-07-25","lat":16.577,"lon":120.4036,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nagrebcan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":90},{"i":114,"cid":"24AF0048","pid":"P00821474LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Sta. Teresa, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48987820.45,"abc":48999991.25,"fy":"2024","sd":"02/29/2024","cd":"2025-03-16","lat":16.365157,"lon":120.403667,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.32,"wp":[16.3633,120.40602],"wst":"matched","br":"Sta. Teresa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":91},{"i":115,"cid":"23AF0075","pid":"P00742276LZ","t":"Construction of Flood Control System Aringay River, Sta. Teresa, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":29000189.13,"abc":29399982.27,"fy":"2023","sd":"03/15/2023","cd":"2023-07-03","lat":16.381294,"lon":120.404658,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"System Aringay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":92},{"i":116,"cid":"23AF0113","pid":"P00727333LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 7)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":24459999.44,"abc":24499999.44,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.380569,"lon":120.404675,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.2,"wp":[16.3815,120.40625],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[863,867,873,886,895,501,504,118,123,117,108,109,107],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":630},{"i":117,"cid":"23AF0109","pid":"P00727242LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":72334993.61,"abc":72374993.61,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.372723,"lon":120.40487,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.72,"wp":[16.36997,120.41096],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[863,867,873,886,895,501,504,118,123,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":379},{"i":118,"cid":"23AF0107","pid":"P00727240LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":72334422.8,"abc":72374996.18,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.278859,"lon":120.404971,"sm":1589,"fm":1589,"tm":1589,"am":1415,"md":2.55,"ls":"adjacent","ww":"Aringay","wn":"Aringay River","wd":8.53,"wp":[16.35554,120.4125],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[863,867,873,886,895,501,504,123,117,108,109,107,116],"cl":[],"L":"records","s":62,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.53,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 8.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":83},{"i":119,"cid":"24AF0049","pid":"P00845902LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Brgy. Leones East, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29693457.1,"abc":29699998.74,"fy":"2024","sd":"02/27/2024","cd":"2025-02-16","lat":16.363388,"lon":120.405002,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.09,"wp":[16.36287,120.40565],"wst":"matched","br":"Leones East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":93},{"i":120,"cid":"24A00155","pid":"P00839551LZ","t":"Construction of Flood Control Structure, Aringay River Basin, Barangay Leones East, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":14849401.14,"abc":14850000.0,"fy":"2024","sd":"09/09/2024","cd":"2024-10-01","lat":16.362418,"lon":120.405027,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.02,"wp":[16.3623,120.40517],"wst":"matched","br":"Leones East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":22,"text":"A PHP 14,849,401 contract recorded as completed 22 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":702},{"i":121,"cid":"23AD0046","pid":"P00727079LZ","t":"Construction of Tamurong Flood Control leading to Candon-Santiago-San Esteban Coastal Road, Barangay Tamurong, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":38023727.14,"abc":39200000.0,"fy":"2023","sd":"04/04/2023","cd":"2024-10-29","lat":17.21407,"lon":120.40523,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tamurong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":94},{"i":122,"cid":"23C00065","pid":"P00726498LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River (Right Bank), Baybayaoas-Telbang Section (Package R), Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":144749856.7,"abc":144749610.0,"fy":"2023","sd":"03/20/2023","cd":"2024-04-22","lat":15.660746,"lon":120.405281,"sm":315,"fm":315,"tm":432,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.06,"wp":[15.66031,120.40496],"wst":"matched","br":null,"len":null,"ph":"Package R","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.21,"text":"The record contradicts itself: the municipality field and the pin point to Camiling, Tarlac, but the title names City of Tarlac, Tarlac, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":419},{"i":123,"cid":"23AF0108","pid":"P00727241LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Tubao, La Union (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":72334998.14,"abc":72374998.14,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.376165,"lon":120.405872,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.4,"wp":[16.37871,120.40853],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[863,867,873,886,895,501,504,118,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":380},{"i":124,"cid":"22A00274","pid":"P00639316LZ","t":"Construction of Slope Protection Works along Naguilian - Bagulin Road, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"BAGULIN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"J.H. PAJARA CONSTRUCTION CORPORATION / S-ANG CONSTRUCTION & GENERAL TRADING, INC.","c":201253790.0,"abc":207475000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-04-12","lat":16.55569,"lon":120.40632,"sm":111,"fm":111,"tm":null,"am":1007,"md":4.75,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.73,"value":4.75,"text":"The pin is 4.8 km outside Bagulin, La Union, the nearest municipality the record claims. It falls in Naguilian, La Union.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":165},{"i":125,"cid":"23AJ0061","pid":"P00737427LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Ican, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":4847330.62,"abc":4950000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-09-01","lat":15.94393,"lon":120.40753,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.83,"wp":[15.93892,120.41332],"wst":"matched","br":"Ican","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":95},{"i":126,"cid":"22CJ0031","pid":"P00621085LZ","t":"Construction of Flood Control Structure along Camiling River (Left Bank, Phase II), Poblacion D to G Section, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48167000.08,"abc":49000000.0,"fy":"2022","sd":"03/12/2022","cd":"2022-11-07","lat":15.68087,"lon":120.408252,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":1.74,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":96},{"i":127,"cid":"23AJ0006","pid":"P00726068LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Ican, Malasiqui, Pangasinan (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19192162.85,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-03-20","lat":15.94914,"lon":120.40848,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":1.24,"wp":[15.93892,120.41332],"wst":"matched","br":"Ican","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":97},{"i":128,"cid":"23AJ0009","pid":"P00726090LZ","t":"Construction of Slope Protection Works along Binalbalolong Creek, Barangay Poblacion, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19599584.16,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-03-20","lat":15.921896,"lon":120.408675,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Binalbalolong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":98},{"i":129,"cid":"24A00442","pid":"P00823292LZ","t":"Construction of Flood Control Structure along Balili River, Barangay Ambaracao Norte, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":115799720.8,"abc":115800000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-08-19","lat":16.502485,"lon":120.40975,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":17.09,"wp":[16.50814,120.56962],"wst":"matched","br":"Ambaracao Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":99},{"i":130,"cid":"24A00280","pid":"P00824809LZ","t":"Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN GABRIEL (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":154399995.6,"abc":154400000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-04-15","lat":16.6822,"lon":120.4098,"sm":1281,"fm":1281,"tm":1281,"am":1281,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":2.26,"wp":[16.66238,120.41485],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":100},{"i":131,"cid":"22CJ0022","pid":"P00631271LZ","t":"Construction of Slope Protection along Camiling River Right Bank, Surgui 1st Section, Surgui 1st, Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":43210090.76,"abc":44100000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-07-22","lat":15.68264,"lon":120.410105,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":1.97,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":101},{"i":132,"cid":"23C00262","pid":"P00725712LZ","t":"Construction of Flood Control Project along Colo Creek Tributary to Colo River, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 3rd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48250000.0,"abc":48249997.25,"fy":"2023","sd":"07/31/2023","cd":"2024-01-26","lat":14.847106,"lon":120.410492,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo Creek","wd":0.01,"wp":[14.84711,120.41055],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":102},{"i":133,"cid":"22CJ0034","pid":"P00631267LZ","t":"Construction of Flood Control Structures Along Camiling River Left Bank Phase II-2, Poblacion D to G Section, Poblacion D to G, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":28870799.6,"abc":29400000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-10-15","lat":15.683279,"lon":120.410616,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.05,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":103},{"i":134,"cid":"22CJ0118","pid":"P00620549LZ","t":"Construction of Drainage Outfall for Romulo Highway (Phase 2), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"CS GONZALES CONSTRUCTION AND SUPPLY","c":19219599.55,"abc":19600000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-14","lat":15.688302,"lon":120.411119,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":104},{"i":135,"cid":"22CA0082","pid":"P00639363LZ","t":"Rehabilitation Canal System of CLBRIS (Colo RIS), Dinaluphan, Bataan","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"TDC II PRO BUILDERS","c":72374999.81,"abc":72374999.81,"fy":"2022","sd":"06/13/2022","cd":"2023-04-19","lat":14.845038,"lon":120.411674,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":105},{"i":136,"cid":"22CJ0187","pid":"P00621570LZ","t":"Construction of Slope Protection Structure Along Camiling River Right Bank, Surgui 1st - Cacamilingan Sur Section (Package B), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-28","lat":15.682664,"lon":120.411703,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.02,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[199,141,164,571,158,137,140],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":299},{"i":137,"cid":"22CJ0193","pid":"P00621572LZ","t":"Construction of Slope Protection Structure along Camiling River, Poblacion D to G Section (Package C), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-22","lat":15.683264,"lon":120.412382,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.11,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[199,136,141,164,571,158,140],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":192},{"i":138,"cid":"24AD0069","pid":"P00823295LZ","t":"Construction of Tamurong Flood Control, Candon City, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":33774671.1,"abc":34300000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-11-22","lat":17.206896,"lon":120.412804,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":106},{"i":139,"cid":"21AC0023","pid":"P00525866LZ","t":"Construction of Seawall, Brgy. Salomague, Cabugao, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"Cabugao","deo":"Ilocos Sur 1st District Engineering Office","co":"VIKING CONSTRUCTION & SUPPLIES","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"02/24/2022","cd":"2022-12-31","lat":17.781272,"lon":120.4135,"sm":280,"fm":null,"tm":280,"am":280,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salomague","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":107},{"i":140,"cid":"22CJ0194","pid":"P00640457LZ","t":"Construction of Slope Protection Structure along Camiling River, Poblacion D to G Serction (Package C), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":97015000.0,"abc":99000000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-29","lat":15.682832,"lon":120.414219,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.14,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[199,136,141,164,571,158,137],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":193},{"i":141,"cid":"22CJ0188","pid":"P00621571LZ","t":"Construction of Slope Protection Structure Along Camiling River Right Bank, Surgui 1st - Cacamilingan Sur Section (Package C), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-04-06","lat":15.681961,"lon":120.414578,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.07,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[199,136,164,571,158,137,140],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":194},{"i":142,"cid":"24AF0140","pid":"P00823314LZ","t":"Construction of Flood Control Structure along Aringay River Basin Barangay Halog East, Tubao, La Union (Package 7)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19284998.86,"abc":19299998.86,"fy":"2024","sd":"05/07/2024","cd":"2025-03-16","lat":16.356472,"lon":120.414691,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.11,"wp":[16.35545,120.41457],"wst":"matched","br":"Halog East","len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":108},{"i":143,"cid":"22CJ0110","pid":"P00621474LZ","t":"Contruction of Slope Protection Structure with Steel Sheet Pile Foundation Along Camiling River Left Bank, Pindangan 1st - Pindangan 2nd Section (Package A), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":94564193.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-04-28","lat":15.746609,"lon":120.415041,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Camiling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":109},{"i":144,"cid":"22A00184","pid":"P00620956LZ","t":"Construction of River Bank Protection along Bued River, Brgy. Macayug, Mangaldan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"FORTHRIGHT CONSTRUCTION","c":24124966.41,"abc":24124999.81,"fy":"2022","sd":"04/07/2022","cd":"2022-12-14","lat":16.08131,"lon":120.41543,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.1,"wp":[16.08076,120.41467],"wst":"matched","br":"Macayug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":110},{"i":145,"cid":"22CJ0009","pid":"P00621090LZ","t":"Construction of Flood Control Structure Along Camiling River Right Bank, Tambugan Section (Phase III), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":38708110.64,"abc":39200000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-07-16","lat":15.701498,"lon":120.415661,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":4.14,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.14,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 4.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":372},{"i":146,"cid":"24AF0052","pid":"P00845904LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Brgy. Halong West, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29693452.57,"abc":29699997.95,"fy":"2024","sd":"02/27/2024","cd":"2025-03-16","lat":16.348489,"lon":120.415777,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.75,"wp":[16.35525,120.41634],"wst":"matched","br":"Halong West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":111},{"i":147,"cid":"24A00441","pid":"P00823291LZ","t":"Construction of Flood Control Structure along Balili River, Barangay Al-Alinao Norte, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":115799749.5,"abc":115800000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-11-11","lat":16.5037,"lon":120.416,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":16.42,"wp":[16.50814,120.56962],"wst":"matched","br":"Al-Alinao Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":112},{"i":148,"cid":"22CJ0018","pid":"P00621088LZ","t":"Construction of Flood Control Structure Along Camiling River Left Bank (Phase II), Cayaoan Section, Cayaoan, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":28782600.04,"abc":29400000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-24","lat":15.693751,"lon":120.416012,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":3.33,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[180,157],"cl":[],"L":"records","s":49,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.33,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0015 to 22CJ0018) cover the same site, together worth PHP 121,388,365.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":193},{"i":149,"cid":"23A00131","pid":"P00726336LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Garcia - Gonzales, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144732166.4,"abc":144750000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-13","lat":16.35235,"lon":120.416893,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.33,"wp":[16.35527,120.41645],"wst":"matched","br":"Garcia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":113},{"i":150,"cid":"23AH0077","pid":"P00727095LZ","t":"Construction of Riverbank Protection, Brgy. Embarcadero, Mangaldan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":26934215.03,"abc":26937260.0,"fy":"2023","sd":"05/12/2023","cd":"2023-10-26","lat":16.07655,"lon":120.4173,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Embarcadero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":114},{"i":151,"cid":"22CJ0011","pid":"P00631272LZ","t":"Construction of Slope Protection along Camiling River Right Bank, Tambungan-Sawat Section, Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":43206331.56,"abc":44100000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-09-20","lat":15.704051,"lon":120.41734,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":4.46,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.46,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 4.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":363},{"i":152,"cid":"23CJ0134","pid":"P00726742LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Right Bank, Surgui 1st - Cacamilingan Sur Section (Package A), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48018969.45,"abc":49000000.0,"fy":"2023","sd":"02/02/2023","cd":"2023-06-21","lat":15.681861,"lon":120.417442,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.22,"wp":[15.6638,120.4085],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":115},{"i":153,"cid":"22CA0022","pid":"P00632808LZ","t":"Construction of Flood Control Structure along Colo River, Malte Section, Phase ERD-I, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"VM BUILDERS CONSTRUCTION CORPORATION","c":14849999.56,"abc":14849999.96,"fy":"2022","sd":"02/21/2022","cd":"2022-08-27","lat":14.845001,"lon":120.41769,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.03,"wp":[14.84531,120.41769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":116},{"i":154,"cid":"23CJ0133","pid":"P00726743LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River Right Bank, Cacamilingan Sur-Cacamilingan Norte Section (Package A), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-06-22","lat":15.687486,"lon":120.417694,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":2.77,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":117},{"i":155,"cid":"24A00258","pid":"P00821479LZ","t":"Construction of Flood Mitigation Structure along Aringay River Basin, Barangay Halog West, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"JABEN GENERAL CONTRACTING & ENG'G SERVICES","c":48249980.3,"abc":48250000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-11-27","lat":16.355874,"lon":120.417911,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.04,"wp":[16.35548,120.41797],"wst":"matched","br":"Halog West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":118},{"i":156,"cid":"23CA0045","pid":"P00742314LZ","t":"Construction of Flood Control Project along Colo River, Maite Section Phase CMD-1 Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19799993.13,"abc":19799999.45,"fy":"2023","sd":"05/25/2023","cd":"2023-12-21","lat":14.845288,"lon":120.418909,"sm":615,"fm":615,"tm":null,"am":512,"md":0.01,"ls":"boundary","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.84509,120.41885],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":119},{"i":157,"cid":"22CJ0017","pid":"P00621087LZ","t":"Construction of Flood Control Structure along Camiling River (Right Bank), Tambugan-Sawat Section (Package A), Sta. 0+567 - Sta. 0+863, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":44217525.58,"abc":44756600.0,"fy":"2022","sd":"03/29/2022","cd":"2022-09-21","lat":15.705916,"lon":120.419009,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":4.71,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":296.0,"ph":"Package A","dup":[],"run":[180,148],"cl":[],"L":"records","s":53,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.71,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 4.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0015 to 22CJ0018) cover the same site, together worth PHP 121,388,365.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":153},{"i":158,"cid":"22CJ0191","pid":"P00640527LZ","t":"Construction of Slope Protection along Camiling River (Left Bank), Pindangan 1st - Pindangan 2nd Section (Package D), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / RCUBE ENGINEERING SERVICES","c":48511637.23,"abc":49500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-26","lat":15.748797,"lon":120.419263,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":9.35,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package D","dup":[],"run":[199,136,141,164,571,137,140],"cl":[],"L":"records","s":57,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":9.35,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 9.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":118},{"i":159,"cid":"24AE0076","pid":"P00844719LZ","t":"Construction of Flood Mitigating Structure, Barangay Pudoc, Bangar, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BANGAR (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ARM-ASIA CONSTRUCTION & ENGINEERING","c":48999163.46,"abc":48999990.12,"fy":"2024","sd":"03/27/2024","cd":"2024-09-10","lat":16.920519,"lon":120.419463,"sm":149,"fm":149,"tm":149,"am":1520,"md":0.56,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pudoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":120},{"i":160,"cid":"22C00083","pid":"P00621161LZ","t":"Construction of Camiling-Agno River Floodway, Tarlac, Phase 3","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) / ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":289500000.0,"abc":289496487.0,"fy":"2022","sd":"07/25/2022","cd":"2024-02-19","lat":15.747492,"lon":120.419517,"sm":315,"fm":315,"tm":432,"am":315,"md":0.0,"ls":"inside","ww":"Camiling-Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.55,"text":"The record contradicts itself: the municipality field and the pin point to Camiling, Tarlac, but the title names City of Tarlac, Tarlac, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":408},{"i":161,"cid":"24CA0036","pid":"P00823396LZ","t":"Construciton of Flood Control Project Along Colo River , Maite Section , Phase IV-DMC, Hermosa, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":96499998.25,"abc":96499998.25,"fy":"2024","sd":"04/23/2024","cd":"2024-12-09","lat":14.845313,"lon":120.420212,"sm":615,"fm":615,"tm":615,"am":512,"md":0.02,"ls":"boundary","ww":"Project Along Colo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":121},{"i":162,"cid":"24AD0070","pid":"P00823296LZ","t":"Construction of Darapidap Flood Control, Candon City, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":41782461.14,"abc":43120000.0,"fy":"2024","sd":"04/24/2024","cd":"2025-02-03","lat":17.20442,"lon":120.42022,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":122},{"i":163,"cid":"24AJ0008","pid":"P00820729LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Barang, Malasiqui, Pangasinan (Phase V)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / RIEMAR CONSTRUCTION","c":47699899.6,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-17","lat":15.925,"lon":120.421,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.04,"wp":[15.92522,120.4207],"wst":"matched","br":"Barang","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":123},{"i":164,"cid":"22CJ0189","pid":"P00621567LZ","t":"Construction of Slope Protection Structure along Camiling River (Package H - Right Bank), Tambugan - Sawat Section, Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":93624301.65,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-22","lat":15.705803,"lon":120.421745,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":4.8,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package H","dup":[],"run":[199,136,141,571,158,137,140],"cl":[],"L":"records","s":63,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.8,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 4.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":71},{"i":165,"cid":"22CJ0029","pid":"P00621092LZ","t":"Construction of Flood Mitigation Structure along Camiling River, Right Bank, Sawat Section (Package D), Sawat, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":48019463.48,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-09-25","lat":15.712043,"lon":120.421926,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":5.45,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Package D","dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.45,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 5.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":340},{"i":166,"cid":"22CJ0172","pid":"P00637029LZ","t":"Construction of Camiling-Agno River Floodway Phase 2, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94473500.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-03-28","lat":15.752422,"lon":120.422225,"sm":315,"fm":315,"tm":432,"am":315,"md":0.0,"ls":"inside","ww":"Camiling-Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.87,"text":"The record contradicts itself: the municipality field and the pin point to Camiling, Tarlac, but the title names City of Tarlac, Tarlac, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":467},{"i":167,"cid":"23AJ0005","pid":"P00726067LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Barang, Malasiqui, Pangasinan (Phase IV)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19591606.43,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-04-17","lat":15.92619,"lon":120.42261,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.02,"wp":[15.92597,120.42264],"wst":"matched","br":"Barang","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":124},{"i":168,"cid":"22CK0106","pid":"P00621574LZ","t":"Rehabilitation of Dike along O'Donnell River (Brgy. Maruglu Section, Sta.2+603.00 to Sta. 3+137.00 - Right Bank), Capas, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":94757810.2,"abc":96499871.83,"fy":"2022","sd":"03/26/2022","cd":"2022-11-24","lat":15.31976,"lon":120.42262,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.29,"wp":[15.3204,120.42004],"wst":"matched","br":"Maruglu Section","len":534.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":125},{"i":169,"cid":"23AJ0066","pid":"P00737425LZ","t":"Construction of Slope Protection along Ingalera River (Phase III), Barangay Barang, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9610913.73,"abc":9900000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-06-19","lat":15.926209,"lon":120.423202,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.02,"wp":[15.92599,120.42318],"wst":"matched","br":"Barang","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":126},{"i":170,"cid":"22CJ0113","pid":"P00637018LZ","t":"Construction of Slope Protection Structure with Steel Sheet Pile Foundation Along Delinquente Creek, Bacabac Section (Package B), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94859500.09,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-28","lat":15.727678,"lon":120.423255,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Delinquente","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":127},{"i":171,"cid":"24AF0051","pid":"P00845905LZ","t":"Construction of Flood Control Structure, Aringay River Basin, Brgy. Magsaysay, Tubao, La Union (Package 4)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29694079.43,"abc":29699998.12,"fy":"2024","sd":"02/27/2024","cd":"2025-03-16","lat":16.344816,"lon":120.423261,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":1.3,"wp":[16.35552,120.41819],"wst":"matched","br":"Magsaysay","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":128},{"i":172,"cid":"22A00317","pid":"P00642731LZ","t":"Rehabilitation of Flood Control System along Abra River, Calungbuyan Bridge, Santa, Ilocos Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.G. LUALHATI CONSTRUCTION CORP.","c":28341642.04,"abc":28950000.0,"fy":"2022","sd":"09/28/2022","cd":"2023-04-23","lat":17.498897,"lon":120.423654,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":0.08,"wp":[17.49893,120.42291],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":129},{"i":173,"cid":"24A00253","pid":"P00821467LZ","t":"Rehabilitation of Amburayan River Control, Barangay Consuegra to Barangay Alzate, Bangar , La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"BANGAR (LA UNION)","deo":"La Union 1st District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48249960.93,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-05","lat":16.909764,"lon":120.423669,"sm":149,"fm":149,"tm":149,"am":1520,"md":0.4,"ls":"boundary","ww":"Amburayan","wn":"Amburayan River","wd":0.52,"wp":[16.90562,120.42145],"wst":"matched","br":"Consuegra","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":130},{"i":174,"cid":"23AD0050","pid":"P00727083LZ","t":"Construction of Villarica-Bagar-Caterman-Darapidap Flood Control, Villarica, Bagar, Caterman and Darapidap, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":47492773.91,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-05-30","lat":17.20659,"lon":120.42369,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":131},{"i":175,"cid":"24AE0022","pid":"P00820128LZ","t":"Construction of Flood Mitigation Structure along Barangay Napaset, Luna, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"LUNA (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":82971637.15,"abc":84262316.12,"fy":"2024","sd":"02/14/2024","cd":"2024-04-29","lat":16.849743,"lon":120.423725,"sm":828,"fm":828,"tm":828,"am":828,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Napaset","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":132},{"i":176,"cid":"23A00115","pid":"P00726341LZ","t":"Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / M.G. LUALHATI CONSTRUCTION CORP.","c":104218299.8,"abc":104220000.0,"fy":"2023","sd":"03/03/2023","cd":"2024-08-08","lat":17.500141,"lon":120.423916,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":0.1,"wp":[17.50019,120.42298],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":133},{"i":177,"cid":"23A00239","pid":"P00726836LZ","t":"Construction of River Bank Protection, Brgy. Sto. Tomas, San Jacinto, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":28946887.58,"abc":28950000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-30","lat":16.071347,"lon":120.424227,"sm":1294,"fm":1294,"tm":1294,"am":916,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":134},{"i":178,"cid":"23CJ0017","pid":"P00735972LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation Along Delinquente Creek, Bacabac Section (Package M), Barangay Bacabac, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":62715307.43,"abc":64655000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-07-16","lat":15.727817,"lon":120.424608,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Delinquente","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bacabac","len":null,"ph":"Package M","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":135},{"i":179,"cid":"22CA0072","pid":"P00621238LZ","t":"Construction of Flood Control Project in Maligaya River, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96499999.24,"abc":96499999.48,"fy":"2022","sd":"07/05/2022","cd":"2023-04-15","lat":14.867796,"lon":120.424618,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Maligaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":136},{"i":180,"cid":"22CJ0015","pid":"P00621084LZ","t":"Construction of Flood Control Structure along Camiling River (Left Bank), Libueg-Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48388239.68,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-08-10","lat":15.716805,"lon":120.424856,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":6.06,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":276.0,"ph":"Package D","dup":[],"run":[157,148],"cl":[],"L":"records","s":56,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.61,"value":6.06,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 6.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0015 to 22CJ0018) cover the same site, together worth PHP 121,388,365.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":131},{"i":181,"cid":"23AD0076","pid":"P00742270LZ","t":"Construction of Calongbuyan Flood Control, Brgy. Calongbuyan, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":19205970.89,"abc":19800000.0,"fy":"2023","sd":"03/31/2023","cd":"2024-10-29","lat":17.1755,"lon":120.42507,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calongbuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":137},{"i":182,"cid":"22A00195","pid":"P00620939LZ","t":"Construction of Flood Mitigation Facilities along Amburayan River Basin, (Phase 1), Barangay Pacac-Baritao-Lantag-Pudoc East, Tagudin, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"TAGUDIN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":19299963.13,"abc":19300000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-08-09","lat":16.9113,"lon":120.42526,"sm":1520,"fm":1520,"tm":1520,"am":1520,"md":0.0,"ls":"inside","ww":"Amburayan","wn":"Amburayan River","wd":0.75,"wp":[16.90532,120.42205],"wst":"matched","br":"Pacac-Baritao-Lantag-Pudoc East","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":138},{"i":183,"cid":"23CA0061","pid":"P00742310LZ","t":"Construction of River Wall, Brgy. Bamban, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"JBI CONSTRUCTION","c":4949998.84,"abc":4949998.84,"fy":"2023","sd":"08/22/2023","cd":"2023-11-16","lat":14.84645,"lon":120.42536,"sm":615,"fm":615,"tm":615,"am":512,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bamban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":139},{"i":184,"cid":"24AF0141","pid":"P00824839LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Brgy. Magsaysay, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19284998.86,"abc":19299998.89,"fy":"2024","sd":"05/07/2024","cd":"2025-03-16","lat":16.3491,"lon":120.4257,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.81,"wp":[16.35632,120.42663],"wst":"matched","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":140},{"i":185,"cid":"24AD0044","pid":"P00844712LZ","t":"Construction of Tabuculan Flood Control, Brgy Tabuculan Santa, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":34299950.55,"abc":34300000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-10-01","lat":17.49168,"lon":120.42614,"sm":1366,"fm":1366,"tm":null,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabuculan Santa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":141},{"i":186,"cid":"22AD0093","pid":"P00641929LZ","t":"Construction of Patpata-Calungbuyan Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":24498030.54,"abc":24500000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-30","lat":17.167052,"lon":120.427193,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":142},{"i":187,"cid":"22EB0100","pid":"P00640563LZ","t":"Construction of Bank Slope Protection along Palicayan River, Paluan, Occidental Mindoro","w":"Construction of Slope Protection Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":46063691.36,"abc":49500000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-02-28","lat":13.426097,"lon":120.427976,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Palicayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":143},{"i":188,"cid":"23A00238","pid":"P00726835LZ","t":"Construction of River Bank Protection, Brgy. Sto. Tomas-Casibong, San Jacinto, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":48247153.84,"abc":48250000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-01-18","lat":16.070934,"lon":120.428112,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Tomas-Casibong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":144},{"i":189,"cid":"23AH0088","pid":"P00742278LZ","t":"Construction of Slope Protection at Brgy. Sto Thomas, San Jacinto, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ZOTA TRADING & CONSTRUCTION","c":21774296.02,"abc":21780000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-08-14","lat":16.07379,"lon":120.4285,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto Thomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":145},{"i":190,"cid":"22CA0043","pid":"P00620503LZ","t":"Construction of Flood Control Structure along Colo River San Benito Section, Phase IV-A, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":23956086.13,"abc":23956099.8,"fy":"2022","sd":"02/21/2022","cd":"2022-07-25","lat":14.843283,"lon":120.42856,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.84319,120.42876],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":146},{"i":191,"cid":"22CJ0005","pid":"P00631268LZ","t":"Construction of Flood Control Structures Along Camiling River Left Bank, Bacabac Section (Phase IV-2), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":28767900.51,"abc":29400000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-23","lat":15.720297,"lon":120.42864,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":6.56,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.56,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 6.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":364},{"i":192,"cid":"23CA0013","pid":"P00726712LZ","t":"Construction of Flood Control along Colo River, Bamban Section Phase III-1C, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":29007996.56,"abc":29007996.56,"fy":"2023","sd":"02/20/2023","cd":"2023-09-25","lat":14.844964,"lon":120.428716,"sm":615,"fm":615,"tm":615,"am":512,"md":0.04,"ls":"boundary","ww":"Colo","wn":"Colo River","wd":0.03,"wp":[14.84477,120.42847],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":147},{"i":193,"cid":"24A00153","pid":"P00821096LZ","t":"Construction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144749737.0,"abc":144750000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-26","lat":16.356512,"lon":120.428731,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.05,"wp":[16.35607,120.42867],"wst":"matched","br":"Halog East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":148},{"i":194,"cid":"24A00440","pid":"P00823290LZ","t":"Construction of Flood Control Structure along Balili River, Barangay Aguioas, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":115799805.6,"abc":115800000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-11-11","lat":16.5148,"lon":120.429,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":15.04,"wp":[16.50814,120.56962],"wst":"matched","br":"Aguioas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":149},{"i":195,"cid":"22AC0015","pid":"P00620778LZ","t":"Construction of Flood Control along Bungro River, Sto. Domingo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTO DOMINGO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION","c":91675000.0,"abc":93100000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-21","lat":17.62585,"lon":120.429022,"sm":1409,"fm":1409,"tm":1409,"am":1409,"md":0.0,"ls":"inside","ww":"Bungro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":150},{"i":196,"cid":"24A00487","pid":"P00843205LZ","t":"Construction of Flood Mitigation Structure along Maluyo River, Barangay Sablut, Balaoan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BALAOAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96492408.53,"abc":96500000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-12-29","lat":16.833328,"lon":120.429063,"sm":121,"fm":121,"tm":121,"am":121,"md":0.0,"ls":"inside","ww":"Maluyo","wn":"MALUYO RIVER","wd":7.24,"wp":[16.77222,120.45327],"wst":"matched","br":"Sablut","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":151},{"i":197,"cid":"23A00130","pid":"P00726335LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144720639.7,"abc":144750000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-13","lat":16.356468,"lon":120.429417,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.05,"wp":[16.35601,120.42938],"wst":"matched","br":"Halog East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":152},{"i":198,"cid":"22AD0100","pid":"P00621513LZ","t":"Construction of Nagpanaoan Flood Control, Santa, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":19004737.39,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-02","lat":17.54835,"lon":120.42947,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":153},{"i":199,"cid":"22CJ0186","pid":"P00621569LZ","t":"Construction of Slope Protection Structure along Camiling River (Packaqe B - Right Bank), Sawat - Bilad Section, Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-22","lat":15.725144,"lon":120.429565,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":7.1,"wp":[15.66534,120.40573],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[136,141,164,571,158,137,140],"cl":[],"L":"records","s":64,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":7.1,"text":"The title names Camiling, which OpenStreetMap maps through the stated municipality, but the pin is 7.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":66},{"i":200,"cid":"22AC0062","pid":"P00640494LZ","t":"Construction of River Promenade (Flood Control) in Brgy. Quezon, Cabugao, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CABUGAO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-08-19","lat":17.796588,"lon":120.457841,"sm":280,"fm":280,"tm":280,"am":280,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":154},{"i":201,"cid":"22A00122","pid":"P00620787LZ","t":"Construction of Flood Control Structure along Sta. Maria River (Package 1), Sta. Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"739 BUILDERS","c":28949952.43,"abc":29400000.0,"fy":"2022","sd":"10/25/2022","cd":"2023-05-15","lat":17.388055,"lon":120.45793,"sm":1392,"fm":1392,"tm":1392,"am":1392,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.07,"wp":[17.38867,120.45785],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":155},{"i":202,"cid":"23AJ0011","pid":"P00726070LZ","t":"Construction of Slope Protection along Angalacan River, Barangay Baloling, Mapandan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MAPANDAN (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19221664.9,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-04-18","lat":16.03057,"lon":120.4581,"sm":927,"fm":927,"tm":927,"am":927,"md":0.0,"ls":"inside","ww":"Angalacan","wn":"Angalacan River","wd":0.04,"wp":[16.03031,120.45835],"wst":"matched","br":"Baloling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":156},{"i":203,"cid":"24AC0027","pid":"P00823312LZ","t":"Construction of Flood Control along San Juan River, Brgy. Resurreccion, San Juan, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN JUAN (LAPOG) (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":82004907.35,"abc":83300000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-08-27","lat":17.736667,"lon":120.458154,"sm":1309,"fm":1309,"tm":1309,"am":1309,"md":0.0,"ls":"inside","ww":"San Juan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Resurreccion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":157},{"i":204,"cid":"22CB0052","pid":"P00631172LZ","t":"Construction of Flood Control Structure at Barangay Biaan, Mariveles, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"MARIVELES (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"AJA BUILDERS","c":9800000.0,"abc":9799999.45,"fy":"2022","sd":"03/18/2022","cd":"2022-08-04","lat":14.448982,"lon":120.45817,"sm":943,"fm":943,"tm":943,"am":943,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":158},{"i":205,"cid":"22AD0048","pid":"P00632739LZ","t":"Construction of Slope Protection at Candon City Sports and Convention Center, Barangay Bagani Campo, Candon City, Ilocos Sur","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":29695852.29,"abc":29700000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-03-29","lat":17.204021,"lon":120.45852,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagani Campo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":159},{"i":206,"cid":"22AD0110","pid":"P00639421LZ","t":"Construction of Retaining Wall at Candon City Sports and Convention Center, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":28517340.06,"abc":29400000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-09-20","lat":17.203588,"lon":120.458571,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":160},{"i":207,"cid":"23AD0041","pid":"P00727074LZ","t":"Construction of Salvador-Bucong Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":23764976.32,"abc":24500000.0,"fy":"2023","sd":"05/11/2023","cd":"2024-03-12","lat":17.23382,"lon":120.4589,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":161},{"i":208,"cid":"23CK0046","pid":"P00726906LZ","t":"Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac,","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":72367030.12,"abc":72374261.77,"fy":"2023","sd":"04/18/2023","cd":"2023-12-15","lat":15.371394,"lon":120.459956,"sm":327,"fm":327,"tm":null,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.06,"wp":[15.37105,120.46033],"wst":"matched","br":null,"len":320.0,"ph":null,"dup":[],"run":[224,990,966],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0046 to 23CK0049) cover the same site, together worth PHP 289,418,577.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":381},{"i":209,"cid":"23AC0059","pid":"P00727065LZ","t":"Construction of Flood Control Structure, Barangay Tay-ac, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"04/27/2023","cd":"2024-05-05","lat":17.606258,"lon":120.459965,"sm":157,"fm":157,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tay-ac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":162},{"i":210,"cid":"24AJ0096","pid":"P00845916LZ","t":"Rehabilitation Flood Control Structures along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":9807797.77,"abc":54450000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-09-11","lat":15.895,"lon":120.46,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.03,"wp":[15.89476,120.45994],"wst":"matched","br":"Malimpec","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":550},{"i":211,"cid":"24AJ0096","pid":"P00845923LZ","t":"Construction of Slope Protection Structure along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan (Phase V)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":24120025.11,"abc":54450000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-09-11","lat":15.895,"lon":120.46,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.03,"wp":[15.89476,120.45994],"wst":"matched","br":"Malimpec","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":529},{"i":212,"cid":"23AC0056","pid":"P00727062LZ","t":"Construction of Flood Control Structure along Bantaoay River, Barangay Lingsat, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-12-10","lat":17.622387,"lon":120.460002,"sm":157,"fm":157,"tm":157,"am":1409,"md":0.1,"ls":"boundary","ww":"Bantaoay","wn":"Bantaoay River","wd":4.6,"wp":[17.63123,120.4177],"wst":"matched","br":"Lingsat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.6,"text":"The title names Bantaoay, which OpenStreetMap maps through the stated municipality, but the pin is 4.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":384},{"i":213,"cid":"22A00123","pid":"P00620788LZ","t":"Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.A. TEJADA CONSTRUCTION","c":28949536.8,"abc":29400000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.386548,"lon":120.460142,"sm":1392,"fm":1392,"tm":1392,"am":1392,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.24,"wp":[17.38844,120.4613],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":163},{"i":214,"cid":"24A00307","pid":"P00821480LZ","t":"Construction of Flood Mitigation Structure along Aringay River Basin, Barangay Tavora East, Pugo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"PUGO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48249567.54,"abc":48250000.0,"fy":"2024","sd":"06/10/2024","cd":"2025-02-26","lat":16.3192,"lon":120.460755,"sm":1181,"fm":1181,"tm":1181,"am":1181,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":4.96,"wp":[16.35649,120.4351],"wst":"matched","br":"Tavora East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.96,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 5.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":341},{"i":215,"cid":"21CK0035","pid":"P00526418LZ","t":"Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"Capas","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":29388967.02,"abc":29399567.7,"fy":"2021","sd":"03/24/2022","cd":"2022-08-16","lat":15.3709,"lon":120.461,"sm":327,"fm":null,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.06,"wp":[15.37129,120.46056],"wst":"matched","br":null,"len":304.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":164},{"i":216,"cid":"24AJ0025","pid":"P00821514LZ","t":"Construction of Protection Works along Agno River, Barangay Tampog, Bayambang, Pangasinan (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":48125303.6,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-08","lat":15.744,"lon":120.461,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.19,"wp":[15.74522,120.46222],"wst":"matched","br":"Tampog","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":165},{"i":217,"cid":"22A00183","pid":"P00621272LZ","t":"Construction of Flood Mitigation Structures along Bued River,  Brgy. Bolo-Labney, San Jacinto, Pangasinan, Sta. 0 + 770 - Sta. 1 + 540","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"TG SURCON BUILDERS INC. / FRAMECON BUILDERS","c":96498788.06,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-06-03","lat":16.11713,"lon":120.46125,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.16,"wp":[16.11825,120.46028],"wst":"matched","br":"Bolo-Labney","len":770.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":166},{"i":218,"cid":"23AJ0010","pid":"P00726069LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Malimpec, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"EXTENSIVE STEEL WORKS AND CONSTRUCTION","c":19207862.6,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-12","lat":15.89411,"lon":120.46142,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.02,"wp":[15.89397,120.46129],"wst":"matched","br":"Malimpec","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":167},{"i":219,"cid":"23AJ0095","pid":"P00727337LZ","t":"Construction of Slope Protection along Agno River, Barangay Tampog, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":19011840.59,"abc":19600000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-07-17","lat":15.745359,"lon":120.461574,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.07,"wp":[15.7454,120.4622],"wst":"matched","br":"Tampog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":168},{"i":220,"cid":"22A00124","pid":"P00620789LZ","t":"Construction of Flood Control Structure along Sta. Maria River (Package 3), Sta. Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":28949795.51,"abc":29400000.0,"fy":"2022","sd":"10/25/2022","cd":"2023-03-26","lat":17.384392,"lon":120.461718,"sm":1392,"fm":1392,"tm":1392,"am":1392,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.18,"wp":[17.3842,120.46343],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":169},{"i":221,"cid":"22AJ0055","pid":"P00637768LZ","t":"Construction of Slope Protection along Brgy. Malimpec, Malasiqui, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9899961.42,"abc":9900000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-12","lat":15.8937,"lon":120.4618,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malimpec","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":170},{"i":222,"cid":"23AJ0125","pid":"P00727336LZ","t":"Construction of Protection Works along Agno River, Brgy. Tampog, Bayambang Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":18983001.6,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-12-18","lat":15.7462,"lon":120.4618,"sm":194,"fm":194,"tm":null,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.05,"wp":[15.74608,120.46228],"wst":"matched","br":"Tampog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":171},{"i":223,"cid":"24A00229","pid":"P00820129LZ","t":"Construction of Flood Mitigation Structure along Bued River, Barangay Bolo, San Jacinto, Pangasinan, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":77197170.06,"abc":77200000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-12","lat":16.115618,"lon":120.461887,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.33,"wp":[16.11556,120.45885],"wst":"matched","br":"Bolo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":172},{"i":224,"cid":"23CK0047","pid":"P00726907LZ","t":"Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":72369873.3,"abc":72374946.37,"fy":"2023","sd":"04/18/2023","cd":"2023-12-15","lat":15.373867,"lon":120.462025,"sm":327,"fm":327,"tm":null,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.08,"wp":[15.37338,120.46257],"wst":"matched","br":null,"len":311.2,"ph":null,"dup":[],"run":[208,990,966],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0046 to 23CK0049) cover the same site, together worth PHP 289,418,577.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":382},{"i":225,"cid":"22AD0045","pid":"P00632735LZ","t":"Construction of Baybayabas Flood Control, Barangay Baybayabas, Santiago, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTIAGO (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4897213.84,"abc":4900000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-30","lat":17.245747,"lon":120.462183,"sm":1407,"fm":1407,"tm":1407,"am":1407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baybayabas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":173},{"i":226,"cid":"22AC0009","pid":"P00620938LZ","t":"Construction of Flood Control Structure, Barangay Lingsat, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-22","lat":17.617136,"lon":120.462688,"sm":157,"fm":157,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lingsat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":174},{"i":227,"cid":"23AF0001","pid":"P00726641LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangays Ambalite, Duplas, Tavora East, and Tavora Proper, Pugo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"PUGO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":48607982.24,"abc":48999998.49,"fy":"2023","sd":"01/31/2023","cd":"2024-02-11","lat":16.31689,"lon":120.463499,"sm":1181,"fm":1181,"tm":1181,"am":1181,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":5.33,"wp":[16.35649,120.4351],"wst":"matched","br":"Ambalite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.33,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 5.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":342},{"i":228,"cid":"24A00241","pid":"P00838507LZ","t":"Construction of Flood Control Structure, Barangay Nalasin, Balaoan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BALAOAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"JMBM CONSTRUCTION","c":28947643.81,"abc":28950000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-06-04","lat":16.817466,"lon":120.464938,"sm":121,"fm":121,"tm":121,"am":1484,"md":2.12,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nalasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":175},{"i":229,"cid":"22CK0103","pid":"P00639486LZ","t":"Rehabilitation of Existing Dike along O''Donell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00  to Sta. 11+102.80, Capas, Tarlac,","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":48953097.08,"abc":48999809.37,"fy":"2022","sd":"03/24/2022","cd":"2022-10-16","lat":15.372778,"lon":120.465,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O''Donell","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":282.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":176},{"i":230,"cid":"24AJ0097","pid":"P00825215LZ","t":"Construction of Flood Control Structure along Agno River, Bongato West Section, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":9533441.56,"abc":39200000.0,"fy":"2024","sd":"05/06/2024","cd":"2024-08-05","lat":15.82,"lon":120.466,"sm":194,"fm":194,"tm":194,"am":191,"md":0.08,"ls":"boundary","ww":"Agno","wn":"Agno River","wd":0.1,"wp":[15.82083,120.46573],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":551},{"i":231,"cid":"23CJ0004","pid":"P00725734LZ","t":"Construction of Flood Control Structure Along Moriones River Left Bank, Tibagan Section (Phase III), Tibagan, Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":70203779.61,"abc":72375000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-06-15","lat":15.617936,"lon":120.466094,"sm":432,"fm":432,"tm":432,"am":1386,"md":9.49,"ls":"outside","ww":"Moriones","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":50,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":9.49,"text":"The pin is 9.5 km outside City of Tarlac, Tarlac, the nearest municipality the record claims. It falls in Santa Ignacia, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":188},{"i":232,"cid":"24AJ0021","pid":"P00821512LZ","t":"Construction of Flood Control Structure along Agno River, Pacuan, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48999982.32,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-05-08","lat":15.853,"lon":120.467,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":1.85,"wp":[15.84509,120.48217],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":177},{"i":233,"cid":"23AC0084","pid":"P00726049LZ","t":"Construction of Flood Control Along Cabugao River, Barangay Quezon, Cabugao, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CABUGAO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"N.A. IBARRA CONSTRUCTION(FOR. DIOCLETIANS CONST.)","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-12-15","lat":17.79798,"lon":120.4679,"sm":280,"fm":280,"tm":280,"am":280,"md":0.0,"ls":"inside","ww":"Cabugao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":178},{"i":234,"cid":"23AF0031","pid":"P00737417LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Duplas, Pugo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"PUGO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":4946717.84,"abc":4949987.72,"fy":"2023","sd":"02/06/2023","cd":"2023-06-05","lat":16.308801,"lon":120.467991,"sm":1181,"fm":1181,"tm":1181,"am":1181,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":6.34,"wp":[16.35649,120.4351],"wst":"matched","br":"Duplas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.34,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 6.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":399},{"i":235,"cid":"22CA0040","pid":"P00620507LZ","t":"Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+739.50 - Sta. (-)1+111.41, Palihan Section Phase 2AGP, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999999.6,"abc":48999999.6,"fy":"2022","sd":"04/11/2022","cd":"2023-02-01","lat":14.859444,"lon":120.468056,"sm":615,"fm":615,"tm":615,"am":512,"md":0.02,"ls":"boundary","ww":"Colo","wn":"Colo River","wd":0.01,"wp":[14.85935,120.46803],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":179},{"i":236,"cid":"23AJ0070","pid":"P00737431LZ","t":"Construction of Flood Control Structure at Barangay Pacuan, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":13546760.75,"abc":13860000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-27","lat":15.852386,"lon":120.468118,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pacuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":180},{"i":237,"cid":"24CH0066","pid":"P00846004LZ","t":"Construciton of Slope Protection along Caulaman River, Dampe Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"120 OVER CONSTRUCTION CO.","c":14844483.15,"abc":14849528.4,"fy":"2024","sd":"03/18/2024","cd":"2024-05-20","lat":14.94534,"lon":120.46835,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":181},{"i":238,"cid":"24AJ0028","pid":"P00821515LZ","t":"Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":48999990.55,"abc":49000000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-08-27","lat":15.76,"lon":120.469,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.02,"wp":[15.75999,120.46884],"wst":"matched","br":"Iton","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":447},{"i":239,"cid":"22EB0096","pid":"P00621623LZ","t":"Construction of River Protection Structures along Calawagan River, Sta. 0+000 - Sta. 0+322, Sta. 0+492 - Sta. 0+772.00, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":46100036.07,"abc":49000000.0,"fy":"2022","sd":"05/30/2022","cd":"2023-03-15","lat":13.427395,"lon":120.469153,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Calawagan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":602.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":182},{"i":240,"cid":"24AD0036","pid":"P00824651LZ","t":"Construction of Langlangca -Salvador Flood Control Structure, Candon City, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":48989188.24,"abc":49000000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-06-25","lat":17.23444,"lon":120.46962,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":183},{"i":241,"cid":"24CA0007","pid":"P00820801LZ","t":"Construction of Flood Control Structure along Colo River (Phase 3AGP), Palihan Section, Hermosa, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999999.85,"abc":48999999.85,"fy":"2024","sd":"02/21/2024","cd":"2024-12-26","lat":14.8568,"lon":120.469883,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.85695,120.46999],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":184},{"i":242,"cid":"24AD0035","pid":"P00824650LZ","t":"Construction of San Esteban Flood Control, San Esteban, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ESTEBAN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":29399480.08,"abc":29400000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-09-13","lat":17.31194,"lon":120.47027,"sm":1268,"fm":1268,"tm":1268,"am":1268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":185},{"i":243,"cid":"23EB0020","pid":"P00725871LZ","t":"Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / C.T. LEONCIO CONSTRUCTION & TRADING","c":96492142.55,"abc":96500000.0,"fy":"2023","sd":"05/02/2023","cd":"2024-04-23","lat":13.389509,"lon":120.470451,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.15,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":251.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":186},{"i":244,"cid":"24CK0125","pid":"P00823375LZ","t":"Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right side. Package G, Capas Tarlac, Sta. 3+412.40 to Sta. 3+773.40","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS","c":95527152.18,"abc":96499769.92,"fy":"2024","sd":"07/02/2024","cd":"2024-11-12","lat":15.349261,"lon":120.471358,"sm":327,"fm":327,"tm":null,"am":327,"md":0.0,"ls":"inside","ww":"Bangut","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":361.0,"ph":"Package G","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":187},{"i":245,"cid":"23A00254","pid":"P00726359LZ","t":"Construction of Flood Control Structure along Sta. Maria River (Package 1) Sta. Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION)","c":46808283.34,"abc":48250000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-12-02","lat":17.381871,"lon":120.471531,"sm":1392,"fm":1392,"tm":null,"am":1392,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.08,"wp":[17.38227,120.47094],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":188},{"i":246,"cid":"22CH0070","pid":"P00637779LZ","t":"Construction of Slope Protection along Caulaman River Carmencita Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":19794566.45,"abc":19799675.86,"fy":"2022","sd":"04/13/2022","cd":"2022-07-06","lat":14.942328,"lon":120.47158,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":189},{"i":247,"cid":"22AD0073","pid":"P00621525LZ","t":"Construction of San Jose-Sta. Lucia Flood Control Structures, Barangay San Jose- Brgy. Sta. Lucia, Narvacan, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"NARVACAN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.A. TEJADA CONSTRUCTION","c":9505483.78,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-06","lat":17.42001,"lon":120.4724,"sm":1012,"fm":1012,"tm":1012,"am":1012,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose- Brgy. Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":190},{"i":248,"cid":"22CA0038","pid":"P00620504LZ","t":"Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+159 - Sta. 0+495.50, Layac Section Phase 1AGP, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999998.32,"abc":48999997.98,"fy":"2022","sd":"04/08/2022","cd":"2022-11-10","lat":14.853273,"lon":120.47313,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.85318,120.47301],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":191},{"i":249,"cid":"24A00443","pid":"P00843190LZ","t":"Construction of Flood Control Structure, Barangay Concepcion-Tabtabungao, Rosario, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ROSARIO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":115799701.5,"abc":115800000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-08-19","lat":16.214,"lon":120.4732,"sm":1216,"fm":1216,"tm":1216,"am":1216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion-Tabtabungao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":192},{"i":250,"cid":"23AJ0073","pid":"P00737433LZ","t":"Construction of Box Culvert at Barangay Taloyan, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ROCKWELL CONSTRUCTION AND SUPPLY","c":4840512.64,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-07-17","lat":15.928036,"lon":120.473202,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Taloyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":193},{"i":251,"cid":"23A00255","pid":"P00726360LZ","t":"Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION)","c":46807469.14,"abc":48250000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-12-02","lat":17.386125,"lon":120.473466,"sm":1392,"fm":1392,"tm":1392,"am":1392,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.08,"wp":[17.38621,120.47277],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":194},{"i":252,"cid":"22AB0074","pid":"P00632727LZ","t":"Construction of Flood Control Structure (Integrated Draining System), Poblacion, Barangays Garreta and Alogoog, Badoc, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":4900000.0,"abc":4900000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-07-09","lat":17.92661,"lon":120.47378,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Garreta","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":195},{"i":253,"cid":"23CB0012","pid":"P00737451LZ","t":"Construction of Flood Control Structure, Tanato, Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"E.R. VENZON CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-05-24","lat":14.635722,"lon":120.474252,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":196},{"i":254,"cid":"24EB0100","pid":"P00820400LZ","t":"Construction of Flood Protection Structure along Barangays Lumangbayan and Marikit, Paluan, Mindoro Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":96496449.5,"abc":96500000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-09-15","lat":13.394094,"lon":120.474378,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumangbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":197},{"i":255,"cid":"22CB0074","pid":"P00621486LZ","t":"Construction of Flood Mitigation Structure along Pantingan River Phase 1, Brgy. Pantingan, Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"ORACLE CONCRETE AND CONSTRUCTION CORP. / ALCEL CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/26/2022","cd":"2023-04-26","lat":14.628503,"lon":120.474543,"sm":1130,"fm":1130,"tm":1130,"am":366,"md":0.02,"ls":"boundary","ww":"Pantingan","wn":"Pantingan River","wd":0.02,"wp":[14.62841,120.47468],"wst":"matched","br":"Pantingan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":198},{"i":256,"cid":"22AD0080","pid":"P00640495LZ","t":"Construction of Banayoyo River Control, Banayoyo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANAYOYO (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19799995.98,"abc":19800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-05","lat":17.233574,"lon":120.474593,"sm":146,"fm":146,"tm":146,"am":146,"md":0.0,"ls":"inside","ww":"Banayoyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":199},{"i":257,"cid":"22CA0032","pid":"P00620505LZ","t":"Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+495.50 - Sta. 0+846.62, Layac Section Phase 2AGP, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999999.85,"abc":48999999.85,"fy":"2022","sd":"04/08/2022","cd":"2022-12-12","lat":14.852013,"lon":120.476038,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.01,"wp":[14.85193,120.47602],"wst":"matched","br":null,"len":351.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":200},{"i":258,"cid":"22CA0031","pid":"P00620506LZ","t":"Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+441.43 - Sta. (-)0+596.40, Palihan Section Phase 1AGP, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999999.42,"abc":48999999.42,"fy":"2022","sd":"04/08/2022","cd":"2022-11-08","lat":14.851667,"lon":120.476111,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.03,"wp":[14.8519,120.47616],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":201},{"i":259,"cid":"22CB0018","pid":"P00620169LZ","t":"Construction of Flood Control Structures in Pantingan River Upstream, Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":93660970.0,"abc":93660970.0,"fy":"2022","sd":"03/14/2022","cd":"2023-02-07","lat":14.631781,"lon":120.476314,"sm":1130,"fm":1130,"tm":1130,"am":366,"md":0.04,"ls":"boundary","ww":"Pantingan","wn":"Pantingan River","wd":0.02,"wp":[14.63174,120.47654],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":202},{"i":260,"cid":"23A00071","pid":"P00725586LZ","t":"Construction of River Control Structure, Brgys. Lacuben-Gabut Sur, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":19299995.86,"abc":19300000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-06-30","lat":17.94374,"lon":120.47642,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":203},{"i":261,"cid":"24AF0017","pid":"P00821469LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Cares, Pugo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"PUGO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":48655692.77,"abc":48999991.11,"fy":"2024","sd":"02/12/2024","cd":"2025-02-16","lat":16.329895,"lon":120.476598,"sm":1181,"fm":1181,"tm":1181,"am":1181,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":5.27,"wp":[16.35826,120.43703],"wst":"matched","br":"Cares","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.27,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 5.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":343},{"i":262,"cid":"22PE0005","pid":"P00621001LZ","t":"Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Coplo and Nangalisan Proper), Tuba, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"TUBA (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"SEJ CONSTRUCTION & AGGREGATES","c":24113608.31,"abc":24500000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-08-05","lat":16.435551,"lon":120.477975,"sm":1587,"fm":1587,"tm":1587,"am":1587,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.02,"wp":[16.43543,120.47785],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":204},{"i":263,"cid":"22EB0097","pid":"P00621624LZ","t":"Construction of River Protection Structures along Katanlawan River, Sta. 0+000 - Sta. 0+840 (L/S), Sta. 0+200 - Sta. 0+360 (R/S), Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":45141156.75,"abc":46060000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-03-15","lat":13.41307,"lon":120.478011,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Katanlawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":205},{"i":264,"cid":"21CH0086","pid":"P00525587LZ","t":"Construction of Slope Protection along Gumain River, Apalit Section, Sta. 00+000 - Sta. 0+580, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"Floridablanca","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":55958985.69,"abc":55969179.22,"fy":"2021","sd":"04/13/2022","cd":"2022-10-24","lat":14.981025,"lon":120.478287,"sm":558,"fm":null,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Gumain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":580.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":206},{"i":265,"cid":"23CH0047","pid":"P00740615LZ","t":"Construction of Slope Protection along Caulaman River, Sto. Rosario Section (down stream), Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"MJBZ BUILDERS AND TRADING","c":29394256.81,"abc":29399936.74,"fy":"2023","sd":"04/17/2023","cd":"2023-10-23","lat":14.8941,"lon":120.4789,"sm":558,"fm":558,"tm":558,"am":512,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[274,266,267],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0047 to 23CH0050) cover the same site, together worth PHP 123,428,042.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":606},{"i":266,"cid":"23CH0049","pid":"P00742351LZ","t":"Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase II), Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":28704277.87,"abc":28709344.15,"fy":"2023","sd":"04/17/2023","cd":"2023-11-27","lat":14.8938,"lon":120.4789,"sm":558,"fm":558,"tm":558,"am":512,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[265,274,267],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0047 to 23CH0050) cover the same site, together worth PHP 123,428,042.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":631},{"i":267,"cid":"23CH0050","pid":"P00742355LZ","t":"Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase III), Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":36624784.11,"abc":36629950.35,"fy":"2023","sd":"04/17/2023","cd":"2023-11-27","lat":14.8919,"lon":120.4792,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[265,274,266],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0047 to 23CH0050) cover the same site, together worth PHP 123,428,042.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":607},{"i":268,"cid":"23AF0030","pid":"P00737416LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Ambalite, Pugo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"PUGO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":4946964.09,"abc":4949997.64,"fy":"2023","sd":"02/06/2023","cd":"2023-06-19","lat":16.294355,"lon":120.479878,"sm":1181,"fm":1181,"tm":1181,"am":1181,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":8.38,"wp":[16.35649,120.4351],"wst":"matched","br":"Ambalite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.38,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 8.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":385},{"i":269,"cid":"21AC0001","pid":"P00525862LZ","t":"Construction of Flood Control, Cabugao River, Brgy. Turod-Patac, Cabugao, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"Cabugao","deo":"Ilocos Sur 1st District Engineering Office","co":"R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"02/24/2022","cd":"2022-12-02","lat":17.788144,"lon":120.479933,"sm":280,"fm":null,"tm":280,"am":280,"md":0.0,"ls":"inside","ww":"Cabugao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Turod-Patac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":207},{"i":270,"cid":"24CB0028","pid":"P00839574LZ","t":"Construction of Flood Control Structure (Phase I), Barangay Pantingan, Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"LEBERN BUILDERS TRADING AND GENERAL SERVICES","c":5798658.09,"abc":5940000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-05-24","lat":14.63628,"lon":120.4802,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pantingan","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":208},{"i":271,"cid":"23AH0073","pid":"P00727091LZ","t":"Construction of Riverbank Protection, Brgy. Poblacion, Manaoag, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":19595588.4,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-14","lat":16.046342,"lon":120.480892,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":209},{"i":272,"cid":"24AJ0038","pid":"P00821517LZ","t":"Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48999982.86,"abc":49000000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-08-27","lat":15.755,"lon":120.481,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.06,"wp":[15.75452,120.48118],"wst":"matched","br":"San Gabriel 2nd","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":210},{"i":273,"cid":"23AJ0125","pid":"P00727339LZ","t":"Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9491153.3,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-12-18","lat":15.755242,"lon":120.482659,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.03,"wp":[15.75498,120.48273],"wst":"matched","br":"San Gabriel 2nd","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":211},{"i":274,"cid":"23CH0048","pid":"P00742350LZ","t":"Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase I), Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":28704722.99,"abc":28709903.47,"fy":"2023","sd":"04/17/2023","cd":"2023-11-27","lat":14.8998,"lon":120.4828,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[265,266,267],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0047 to 23CH0050) cover the same site, together worth PHP 123,428,042.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":632},{"i":275,"cid":"22AI0024","pid":"P00631098LZ","t":"Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 2)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48261362.1,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-27","lat":16.1642,"lon":120.4834,"sm":1468,"fm":1468,"tm":1468,"am":1468,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.3,"wp":[16.16565,120.48103],"wst":"matched","br":"Amagbagan-Tara-Tara","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":212},{"i":276,"cid":"23AH0069","pid":"P00727087LZ","t":"Construction of Riverbank Protection, Brgy. Pugaro, Manaoag, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":29392643.7,"abc":29400000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-02-15","lat":16.049935,"lon":120.4837,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pugaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":213},{"i":277,"cid":"22CA0021","pid":"P00620500LZ","t":"Construction of Flood Control Project along Pagalanggang River, Old San Jose Section, Phase ERD-I, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"VM BUILDERS CONSTRUCTION CORPORATION","c":24499999.72,"abc":24499999.72,"fy":"2022","sd":"02/21/2022","cd":"2022-09-23","lat":14.9138,"lon":120.483849,"sm":512,"fm":512,"tm":512,"am":558,"md":0.03,"ls":"boundary","ww":"Pagalanggang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":214},{"i":278,"cid":"24AC0001","pid":"P00820101LZ","t":"Construction of Flood Control along Sinait River, Barangay Aguing, Sinait, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SINAIT (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"739 BUILDERS","c":35065183.86,"abc":35370145.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-06","lat":17.870288,"lon":120.484642,"sm":1460,"fm":1460,"tm":1460,"am":1460,"md":0.0,"ls":"inside","ww":"Sinait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Aguing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":215},{"i":279,"cid":"22CH0043","pid":"P00621458LZ","t":"Construction of Slope Protection along Caulaman River, Sto. Rosario Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":48847004.76,"abc":48852777.44,"fy":"2022","sd":"04/13/2022","cd":"2022-10-09","lat":14.902279,"lon":120.485214,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Caulaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":216},{"i":280,"cid":"22AC0011","pid":"P00631069LZ","t":"Construction of Flood Control Structure, Barangay San Mariano, Bantay, locos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-08-07","lat":17.556227,"lon":120.485498,"sm":157,"fm":157,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Mariano","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":217},{"i":281,"cid":"24A00245","pid":"P00821524LZ","t":"Construction of Slope Protection Works along Sinucalan River, Barangay Minien East, Sta. Barbara, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA BARBARA (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48137413.02,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-20","lat":15.982536,"lon":120.48604,"sm":1370,"fm":1370,"tm":1370,"am":1370,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":0.03,"wp":[15.98268,120.48632],"wst":"matched","br":"Minien East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":218},{"i":282,"cid":"22AC0010","pid":"P00631068LZ","t":"Construction of Flood Control, San Mariano, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-12-16","lat":17.553873,"lon":120.486524,"sm":157,"fm":157,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":219},{"i":283,"cid":"22AD0062","pid":"P00620129LZ","t":"Construction of San Antonio River Control Structure, Barangay San Antonio, Narvacan, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"NARVACAN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"739 BUILDERS","c":86849854.45,"abc":88200000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-04-17","lat":17.408764,"lon":120.487433,"sm":1012,"fm":1012,"tm":1012,"am":1012,"md":0.0,"ls":"inside","ww":"San Antonio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":220},{"i":284,"cid":"23CH0005","pid":"P00726176LZ","t":"Construction of Carmencita Road Dike, Floridablanca, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"PASCAL CONSTRUCTION","c":29393715.3,"abc":29398757.7,"fy":"2023","sd":"02/27/2023","cd":"2023-08-25","lat":14.945689,"lon":120.4888,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":221},{"i":285,"cid":"22CA0071","pid":"P00640513LZ","t":"Construction of Flood Control Structure along Pentor, Balsik River, Balsik Section Phase ATR-1, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":39599984.38,"abc":39599997.96,"fy":"2022","sd":"06/07/2022","cd":"2022-12-09","lat":14.853122,"lon":120.488994,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Balsik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":222},{"i":286,"cid":"22A00335","pid":"P00644722LZ","t":"Repair/Rehabilitation of Flood Control Project along Ubbog River, Brgy. Callaguip, Paoay, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY / NOSIDE CONSTRUCTION","c":47528651.6,"abc":48250000.0,"fy":"2022","sd":"01/19/2023","cd":"2023-04-11","lat":18.071149,"lon":120.489026,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Ubbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Callaguip","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":223},{"i":287,"cid":"24CA0047","pid":"P00823392LZ","t":"Construction of Flood Control Project along Pentor - Balsik River, Balsik Section, Phase IV-DMC, Hermosa, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":96499998.25,"abc":96499999.64,"fy":"2024","sd":"04/23/2024","cd":"2024-12-02","lat":14.852907,"lon":120.489723,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Balsik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":224},{"i":288,"cid":"22AD0083","pid":"P00640498LZ","t":"Construction of Sta. Lucia River Control, Santiago, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA LUCIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES / EJIEV CONSTRUCTION SERVICES","c":19799998.31,"abc":19800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-05-01","lat":17.117877,"lon":120.489861,"sm":1388,"fm":1388,"tm":1407,"am":1388,"md":0.0,"ls":"inside","ww":"Sta. Lucia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":13.18,"text":"The record contradicts itself: the municipality field and the pin point to Santa Lucia, Ilocos Sur, but the title names Santiago, Ilocos Sur, 13 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":597},{"i":289,"cid":"23AB0145","pid":"P00726853LZ","t":"Construction of Flood Control Structure along Quiaoit River, Brgy. Callaguip, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":9650000.0,"abc":9650000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-08-15","lat":18.07249,"lon":120.49021,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.6,"wp":[18.06725,120.48872],"wst":"matched","br":"Callaguip","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":225},{"i":290,"cid":"23AB0149","pid":"P00726850LZ","t":"Construction of Flood Control Structure traversing Manila North Road, Upstream & Downstream of Apatut Bridge, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":9215046.51,"abc":9650000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-10-05","lat":17.94909,"lon":120.49024,"sm":1340,"fm":1340,"tm":null,"am":1143,"md":20.61,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":20.61,"text":"The pin is 20.6 km outside San Nicolas, Ilocos Norte, the nearest municipality the record claims. It falls in Pinili, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":265},{"i":291,"cid":"22AI0011","pid":"P00631097LZ","t":"Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 1)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48255997.27,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-26","lat":16.1722,"lon":120.49033,"sm":1468,"fm":1468,"tm":1468,"am":1468,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.42,"wp":[16.1744,120.48713],"wst":"matched","br":"Amagbagan-Tara-Tara","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":226},{"i":292,"cid":"24E00054","pid":"P00823576LZ","t":"Construction of Road Dike/Esplanade along Sitio Katanlawan, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":241246348.7,"abc":241250000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-12-07","lat":13.417712,"lon":120.490344,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":227},{"i":293,"cid":"22CK0084","pid":"P00639367LZ","t":"Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta.1+082.80 to Sta.1+640 - Right Bank), Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94481613.13,"abc":96499939.51,"fy":"2022","sd":"03/26/2022","cd":"2022-08-08","lat":15.37805,"lon":120.49055,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Bangut","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Lucia Section","len":557.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":228},{"i":294,"cid":"24A00424","pid":"P00848604LZ","t":"Construction of Flood Control Structure along Badoc River, Barangay Mabusag Sur, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":53459995.32,"abc":53460000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-11-30","lat":17.927309,"lon":120.49084,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.01,"wp":[17.92729,120.49077],"wst":"matched","br":"Mabusag Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":229},{"i":295,"cid":"22AI0030","pid":"P00620461LZ","t":"Construction of Flood Control Structure along Agno River (Package 2), Alcala, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"ALCALA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":33779643.34,"abc":34300000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-07-02","lat":15.8331,"lon":120.4911,"sm":24,"fm":24,"tm":24,"am":24,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.09,"wp":[15.83378,120.49067],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":230},{"i":296,"cid":"22AH0070","pid":"P00631085LZ","t":"Construction of Riverbank Protection at Brgy. Pugaro, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":14260946.7,"abc":14700000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-11","lat":16.062184,"lon":120.491283,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pugaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":231},{"i":297,"cid":"21CA0048","pid":"P00525984LZ","t":"Construction/Rehabilitation of Flood Control Project in Pentor-Balsik River, Daang Bago Section, Phase B, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"Dinalupihan","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48999998.19,"abc":48999998.19,"fy":"2021","sd":"03/14/2022","cd":"2022-12-01","lat":14.864408,"lon":120.491383,"sm":512,"fm":null,"tm":512,"am":615,"md":1.13,"ls":"adjacent","ww":"Pentor-Balsik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":232},{"i":298,"cid":"23A00102","pid":"P00725600LZ","t":"Construction of Flood Control Structure along Badoc River Barangay Lubigan, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":48249992.07,"abc":48250000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-08-06","lat":17.92054,"lon":120.49331,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.08,"wp":[17.92122,120.49343],"wst":"matched","br":"Lubigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":233},{"i":299,"cid":"22CK0099","pid":"P00639366LZ","t":"Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta. 1+640 to Sta. 2+200), Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96496291.64,"abc":96499799.7,"fy":"2022","sd":"03/26/2022","cd":"2023-01-18","lat":15.380061,"lon":120.493958,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Bangut","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Lucia Section","len":560.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":234},{"i":300,"cid":"22KJ0037","pid":"P00630587MN","t":"Construction of Usugan River Control (Upstream), Bonifacio, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"BONIFACIO (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":19300519.14,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-23","lat":8.019233,"lon":123.590489,"sm":225,"fm":225,"tm":225,"am":1536,"md":0.89,"ls":"boundary","ww":"Usugan","wn":"Usugan River","wd":6.05,"wp":[8.0427,123.54093],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.61,"value":6.05,"text":"The title names Usugan, which OpenStreetMap maps through the stated municipality, but the pin is 6.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":373},{"i":301,"cid":"22NC0034","pid":"P00620299MN","t":"Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+090.00, Rosario, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"INNOVATI CONSTRUCTION & DEVELOPMENT CORPORATION","c":29399995.42,"abc":29400000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-03-13","lat":8.373423,"lon":126.006402,"sm":1220,"fm":1220,"tm":1220,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.04,"wp":[8.37314,126.00663],"wst":"matched","br":null,"len":90.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":235},{"i":302,"cid":"22KA0038","pid":"P00620114MN","t":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Bonacao Stream - Bonacao Bridge, Tributary to Pulangui River), Brgy. Bonacao, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":48999994.29,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-10-26","lat":7.800405,"lon":125.393616,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Bonacao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bonacao","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":236},{"i":303,"cid":"22NI0069","pid":"P00632322MN","t":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":96399243.69,"abc":96500000.0,"fy":"2022","sd":"06/22/2022","cd":"2023-09-15","lat":7.90878,"lon":126.358205,"sm":372,"fm":372,"tm":null,"am":229,"md":16.9,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.91,"value":16.9,"text":"The pin is 16.9 km outside City of Bislig, Surigao del Sur, the nearest municipality the record claims. It falls in Boston, Davao Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":132},{"i":304,"cid":"22AG0021","pid":"P00631081LZ","t":"Construction of Bolinao Seawall, Brgy. Poblacion, Bolinao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BOLINAO (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S)","c":34299548.02,"abc":34300000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-09-06","lat":16.393694,"lon":119.891439,"sm":218,"fm":218,"tm":218,"am":218,"md":0.12,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":237},{"i":305,"cid":"23A00089","pid":"P00725616LZ","t":"Construction of Flood Control Structure along Govantes River, Cabittaogan, Sta. Catalina, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CATALINA (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SATRAP CONSTRUCTION CO., INC.","c":67549992.23,"abc":67550000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-08","lat":17.565903,"lon":120.346041,"sm":1372,"fm":1372,"tm":1372,"am":1372,"md":0.0,"ls":"inside","ww":"Govantes","wn":"Govantes River","wd":0.05,"wp":[17.56546,120.34606],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":238},{"i":306,"cid":"24AF0126","pid":"P00824812LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 10), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.","c":82403230.11,"abc":82410999.95,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.505633,"lon":120.401368,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 10","dup":[],"run":[536,548,553,578,598,592,593,586,534],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":300},{"i":307,"cid":"22AD0109","pid":"P00639420LZ","t":"Construction of Pinsal Falls Flood Control Structure, Sta Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION)","c":4899720.46,"abc":4900000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-29","lat":17.375802,"lon":120.549398,"sm":1392,"fm":1392,"tm":1392,"am":1135,"md":0.34,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":239},{"i":308,"cid":"24AA0204","pid":"P00838484LZ","t":"Construction of Flood Control Structure along Sitio Kabaywasan, Barangay Bani, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4899978.15,"abc":4899984.16,"fy":"2024","sd":"02/27/2024","cd":"2024-04-13","lat":18.263152,"lon":120.561059,"sm":89,"fm":89,"tm":89,"am":751,"md":0.13,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bani","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":240},{"i":309,"cid":"23CC0248","pid":"P00742158LZ","t":"Construction of Flood Mitigation Structures along Bgry. Pamarawan, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":59358779.56,"abc":59399680.02,"fy":"2023","sd":"03/28/2023","cd":"2023-12-22","lat":14.757415,"lon":120.809685,"sm":401,"fm":401,"tm":401,"am":401,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":241},{"i":310,"cid":"24CC0261","pid":"P00820227LZ","t":"Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":72374895.37,"abc":72374911.43,"fy":"2024","sd":"04/02/2024","cd":"2024-06-11","lat":14.827436,"lon":120.820479,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Atlag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":242},{"i":311,"cid":"23CD0056","pid":"P00727363LZ","t":"Rehabilitation of Pumping Stations at Marilao, Bulacan","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":4825444.4,"abc":4898928.32,"fy":"2023","sd":"03/13/2023","cd":"2023-05-16","lat":14.753638,"lon":120.951773,"sm":941,"fm":941,"tm":248,"am":941,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":19,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.19,"text":"The record contradicts itself: the municipality field and the pin point to Marilao, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":634},{"i":312,"cid":"23OE0060","pid":"P00740278LZ","t":"Construction of Pumping Station at Barangay 182, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JIIK CONSTRUCTION SERVICES","c":96419364.54,"abc":96499104.19,"fy":"2023","sd":"03/28/2023","cd":"2024-05-05","lat":14.631083,"lon":120.970972,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"182","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":1},{"i":313,"cid":"23OE0101","pid":"P00737403LZ","t":"Rehabilitation of Drainage, Barangay 179, Zone 16, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DENNREY CONSTRUCTION AND TRADING COMPANY","c":4948482.78,"abc":4948968.77,"fy":"2023","sd":"03/08/2023","cd":"2023-07-23","lat":14.629625,"lon":120.97274,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"179","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":2},{"i":314,"cid":"23OE0104","pid":"P00737404LZ","t":"Rehabilitation of Drainage, Barangay 181, Zone 16, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DENNREY CONSTRUCTION AND TRADING COMPANY","c":9892991.03,"abc":9898703.16,"fy":"2023","sd":"03/08/2023","cd":"2023-09-01","lat":14.631274,"lon":120.973333,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"181","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":3},{"i":315,"cid":"23OE0061","pid":"P00740287LZ","t":"Installation of Booster Pump at Estero de Maypajo (Phase I), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93973783.55,"abc":96499285.72,"fy":"2023","sd":"03/28/2023","cd":"2023-07-12","lat":14.634801,"lon":120.973685,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.56,"wp":[14.63581,120.96863],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[316,317],"run":[316,317,3230],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 281,780,289.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0061 to 23OE0064) cover the same site, together worth PHP 368,630,125.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":25},{"i":316,"cid":"23OE0062","pid":"P00740288LZ","t":"Installation of Booster Pump at Estero de Maypajo (Phase II), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93855667.56,"abc":96499390.45,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.634801,"lon":120.973685,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.56,"wp":[14.63581,120.96863],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[315,317],"run":[315,317,3230],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 281,780,289.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0061 to 23OE0064) cover the same site, together worth PHP 368,630,125.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":26},{"i":317,"cid":"23OE0063","pid":"P00740289LZ","t":"Installation of Booster Pump at Estero de Maypajo (Phase III), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93950837.84,"abc":96499089.29,"fy":"2023","sd":"03/28/2023","cd":"2023-07-26","lat":14.634801,"lon":120.973685,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.56,"wp":[14.63581,120.96863],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[315,316],"run":[315,316,3230],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 281,780,289.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0061 to 23OE0064) cover the same site, together worth PHP 368,630,125.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":27},{"i":318,"cid":"23OE0105","pid":"P00737405LZ","t":"Rehabilitation of Drainage, Barangay 186, Zone 16, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DENNREY CONSTRUCTION AND TRADING COMPANY","c":9879998.59,"abc":9898819.64,"fy":"2023","sd":"03/08/2023","cd":"2023-11-24","lat":14.63075,"lon":120.974258,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"186","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":4},{"i":319,"cid":"23D00168","pid":"P00742425LZ","t":"Construction of Flood Control Structures along Zapote River at Barangay San Nicolas 1, Bacoor, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":19797210.25,"abc":19800000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-04-05","lat":14.436324,"lon":120.977679,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.03,"wp":[14.43643,120.97795],"wst":"matched","br":"San Nicolas 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":243},{"i":320,"cid":"23OE0051","pid":"P00725996LZ","t":"Construction of Retarding Basin at Estero de Maypajo, (Phase II), Tondo, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":34298030.64,"abc":34299867.73,"fy":"2023","sd":"02/13/2023","cd":"2024-01-30","lat":14.634319,"lon":120.978434,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":1.06,"wp":[14.6369,120.96893],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":5},{"i":321,"cid":"22OC0062","pid":"P00620370LZ","t":"Rehabilitation / Upgrading and Drainage Improvement at Tramo II & its vicinity, Brgy. San Dionisio, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":24495923.62,"abc":24500000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-12-08","lat":14.488739,"lon":120.989657,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":244},{"i":322,"cid":"22OI0038","pid":"P00620906LZ","t":"Construction of Flood Control Structure at Zapote River, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":28158400.47,"abc":29397955.97,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.394145,"lon":121.00206,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.04,"wp":[14.39381,121.00209],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":245},{"i":323,"cid":"24OF0026","pid":"P00821458LZ","t":"Construction of Flood Control Structure at Talayan Creek, Barangay Sto. Domingo, Quezon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48508612.63,"abc":48999608.72,"fy":"2024","sd":"02/06/2024","cd":"2024-12-01","lat":14.630019,"lon":121.012121,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Talayan","wn":"Talayan Creek","wd":0.01,"wp":[14.63006,121.0121],"wst":"matched","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":246},{"i":324,"cid":"21DI0053","pid":"P00561774LZ","t":"Construction of Revetment along Narra Road, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"City of San Pedro","deo":"Laguna 2nd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":28809112.3,"abc":29700000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-08-24","lat":14.345685,"lon":121.023133,"sm":418,"fm":null,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":247},{"i":325,"cid":"23J00187","pid":"P00735025MN","t":"Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"SULU","mu":"MAIMBUNG (SULU)","deo":"Sulu 1st District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":48192075.61,"abc":48250000.0,"fy":"2023","sd":"08/03/2023","cd":"2024-01-20","lat":5.928805,"lon":121.027815,"sm":880,"fm":880,"tm":880,"am":880,"md":0.0,"ls":"inside","ww":"Sapah Maluwang","wn":"Sapah Maluwang","wd":0.01,"wp":[5.92882,121.02789],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":248},{"i":326,"cid":"22OI0049","pid":"P00620763LZ","t":"Construction of Flood Control Structure along Laguna de Bay, Barangay Putatan, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":91568484.81,"abc":91673632.46,"fy":"2022","sd":"02/17/2022","cd":"2022-08-25","lat":14.400642,"lon":121.052231,"sm":407,"fm":407,"tm":407,"am":407,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":249},{"i":327,"cid":"22OI0045","pid":"P00620764LZ","t":"Construction of Flood Control Structure, Aplaya, Barangay Poblacion, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":92570039.77,"abc":92636132.18,"fy":"2022","sd":"04/07/2022","cd":"2022-12-12","lat":14.389618,"lon":121.05405,"sm":407,"fm":407,"tm":407,"am":407,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":250},{"i":328,"cid":"24OB0186","pid":"P00821069LZ","t":"Construction of Slope Protection at Lakeshore, Barangay Hagonoy, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":141782501.1,"abc":144749873.5,"fy":"2024","sd":"05/29/2024","cd":"2025-01-07","lat":14.505083,"lon":121.06903,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hagonoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":251},{"i":329,"cid":"22DI0080","pid":"P00620218LZ","t":"Construction of Flood Mitigation Structure along Biñan River, Brgy. Malaban, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":92594196.37,"abc":92640000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-09-18","lat":14.35614,"lon":121.09413,"sm":371,"fm":371,"tm":371,"am":371,"md":0.35,"ls":"boundary","ww":"Biñan","wn":"Biñan River","wd":0.03,"wp":[14.35634,121.094],"wst":"matched","br":"Malaban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":252},{"i":330,"cid":"23OB0090","pid":"P00725939LZ","t":"Rehabilitation of Flood Mitigation Structure, Buli Creek at Barangay San Miguel and Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":26918501.97,"abc":32045188.35,"fy":"2023","sd":"02/06/2023","cd":"2023-09-03","lat":14.569633,"lon":121.098963,"sm":412,"fm":412,"tm":412,"am":289,"md":0.08,"ls":"boundary","ww":"Buli","wn":"Buli Creek","wd":0.66,"wp":[14.57524,121.10092],"wst":"matched","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":253},{"i":331,"cid":"22OB0073","pid":"P00620365LZ","t":"Maintenance and Rehabilitation of Flood Control Structure along Ilugin River, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":45822749.02,"abc":48249709.4,"fy":"2022","sd":"03/14/2022","cd":"2022-10-03","lat":14.551402,"lon":121.104079,"sm":412,"fm":412,"tm":412,"am":289,"md":0.01,"ls":"boundary","ww":"Ilugin","wn":"Ilugin River","wd":0.4,"wp":[14.55356,121.10108],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":254},{"i":332,"cid":"23OB0098","pid":"P00727008LZ","t":"Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":3717255.0,"abc":3918778.99,"fy":"2023","sd":"03/06/2023","cd":"2023-05-04","lat":14.59189,"lon":121.106119,"sm":412,"fm":412,"tm":412,"am":289,"md":0.04,"ls":"boundary","ww":"Nagcruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":255},{"i":333,"cid":"23OB0097","pid":"P00725958LZ","t":"Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":13917186.0,"abc":14699439.76,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.591034,"lon":121.106359,"sm":412,"fm":412,"tm":412,"am":289,"md":0.08,"ls":"boundary","ww":"Nagcruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":256},{"i":334,"cid":"22DN0082","pid":"P00620644LZ","t":"Construction/Rehabilitation of Flood Control Structure at Patoto Creek, (Phase 2), Sta. 0+141.6 - Sta. 0+440, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":38092846.4,"abc":39200000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-09-26","lat":14.532123,"lon":121.137907,"sm":1556,"fm":1556,"tm":1556,"am":62,"md":0.24,"ls":"boundary","ww":"Patoto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":298.4,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":257},{"i":335,"cid":"21DN0125","pid":"P00561394LZ","t":"Construction of Drainage System along Botong Francisco Ave. Ext. Brgy. Mahabang Parang, Angono, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Angono","deo":"Rizal 1st District Engineering Office","co":"AARCON BUILDERS","c":44510754.03,"abc":44550000.0,"fy":"2021","sd":"03/24/2022","cd":"2023-02-15","lat":14.53781,"lon":121.14881,"sm":62,"fm":null,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahabang Parang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":258},{"i":336,"cid":"23J00153","pid":"P00721663MN","t":"Construction of Flood Control Structure along Seit-Tayungan-Camp Andres Road, Panamao, Sulu","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"SULU","mu":"OLD PANAMAO (SULU)","deo":"Sulu 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ZHEREB CONSTRUCTION","c":67212246.7,"abc":67550000.0,"fy":"2023","sd":"08/03/2023","cd":"2024-04-28","lat":5.979381,"lon":121.215098,"sm":1035,"fm":1035,"tm":null,"am":1035,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":259},{"i":337,"cid":"23J00118","pid":"P00721236MN","t":"Construction of Flood Control Structure along Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"SULU","mu":"LUUK (SULU)","deo":"Sulu 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48008750.33,"abc":48250000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-07","lat":5.967259,"lon":121.31338,"sm":835,"fm":835,"tm":835,"am":835,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":260},{"i":338,"cid":"23DD0076","pid":"P00737497LZ","t":"Construction of Drainage System in Barangay Calit-Calit, San Juan, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"TONIJON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: TONIJON CONSTRUCTION)","c":4801496.0,"abc":4950000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-18","lat":13.8267,"lon":121.3992,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calit-Calit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":261},{"i":339,"cid":"22BF0003","pid":"P00631118LZ","t":"Construction of Siffu River Flood Control Structure (Sitio Pag-asa Section Phase II) Brgy. Simimbaan, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":41663887.47,"abc":42140000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-02","lat":17.1346,"lon":121.564964,"sm":1222,"fm":1222,"tm":1222,"am":1102,"md":0.18,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":5.18,"wp":[17.13098,121.61355],"wst":"matched","br":"Simimbaan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.18,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 5.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":349},{"i":340,"cid":"23BF0004","pid":"P00726426LZ","t":"Construction of Siffu River Flood Control Project (Sitio Pag-asa Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Simimbaan, Roxas, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) / JWU CONSTRUCTION AND SUPPLY","c":48229649.53,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-07-02","lat":17.135401,"lon":121.566533,"sm":1222,"fm":1222,"tm":1222,"am":1102,"md":0.02,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":5.03,"wp":[17.13098,121.61355],"wst":"matched","br":"Simimbaan","len":400.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":5.03,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 5.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":350},{"i":341,"cid":"23BC0015","pid":"P00726115LZ","t":"Construction of CSU-Lasam River Control Structure along Kikking River, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"HHK CONSTRUCTION","c":4847996.84,"abc":4900000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-05-25","lat":18.077401,"lon":121.606624,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":"CSU-Lasam","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":262},{"i":342,"cid":"23BG0078","pid":"P00727355LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Dangan (Sta. 0+000 - Sta. 0+550), Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":48659086.18,"abc":48679453.7,"fy":"2023","sd":"03/15/2023","cd":"2023-10-25","lat":17.005545,"lon":121.752095,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":5.39,"wp":[16.96778,121.78413],"wst":"matched","br":"Dangan","len":550.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.39,"text":"The title names Cagayan, which OpenStreetMap maps through the stated municipality, but the pin is 5.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":344},{"i":343,"cid":"21BG0023","pid":"P00525960LZ","t":"Construction of Cagayan River Flood Control Project Brgy. Labinab Grande, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Reina Mercedes","deo":"Isabela 3rd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":46493250.44,"abc":47225210.54,"fy":"2021","sd":"01/19/2022","cd":"2022-12-15","lat":16.979236,"lon":121.807307,"sm":1203,"fm":null,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.11,"wp":[16.97828,121.80728],"wst":"matched","br":"Labinab Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":263},{"i":344,"cid":"22JH0016","pid":"P00630472MN","t":"Construction of Flood Control Structure at Fuente Maluso along Basilan Circumferential Rd, Sta. 0 + 000 - Sta. 0 + 400, Maluso, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"MALUSO (BASILAN)","deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / BOSH MEGATRADE AND SERVICES CO.","c":53034576.67,"abc":53075000.0,"fy":"2022","sd":"02/26/2022","cd":"2023-05-15","lat":6.5479,"lon":121.8948,"sm":904,"fm":904,"tm":904,"am":904,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":264},{"i":345,"cid":"22DL0148","pid":"P00620616LZ","t":"Construction of Seawall Atimonan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-03","lat":14.002923,"lon":121.925564,"sm":81,"fm":81,"tm":1188,"am":81,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.95,"text":"The record contradicts itself: the municipality field and the pin point to Atimonan, Quezon, but the title names Quezon, Quezon, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":574},{"i":346,"cid":"24DL0030","pid":"P00820910LZ","t":"Construction of Breakwater, Atimonan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":19579679.37,"abc":19600000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-06-10","lat":14.003703,"lon":121.925879,"sm":81,"fm":81,"tm":81,"am":81,"md":0.17,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":265},{"i":347,"cid":"24DL0099","pid":"P00820925LZ","t":"Construction of Seawall, Atimonan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":9796174.35,"abc":9800000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-06-10","lat":14.003966,"lon":121.926065,"sm":81,"fm":81,"tm":81,"am":81,"md":0.21,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":266},{"i":348,"cid":"20J00047","pid":"P00420382MN","t":"Construction of revetment, Kumalarang River, Isabela City, Basilan","w":"Construction of Revetment","rg":"Region IX","pv":"BASILAN","mu":null,"deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / HHH DEVELOPER AND CONSTRUCTION","c":105571270.5,"abc":107725803.8,"fy":"2020","sd":"11/23/2020","cd":"2022-07-17","lat":6.618078,"lon":121.931877,"sm":null,"fm":null,"tm":null,"am":390,"md":null,"ls":"unknown","ww":"Kumalarang","wn":"Kumalarang River","wd":0.02,"wp":[6.61793,121.93176],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":6},{"i":349,"cid":"23BA0030","pid":"P00727341LZ","t":"Construction of Seawall (Busbusan), Barangay Hañib, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":16445177.1,"abc":20580000.0,"fy":"2023","sd":"05/16/2023","cd":"2024-08-15","lat":20.416922,"lon":121.945008,"sm":876,"fm":876,"tm":876,"am":876,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hañib","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":267},{"i":350,"cid":"23JH0031","pid":"P00733983MN","t":"Construction of Flood Control Structure, Bohe-Bacung Bridge, Sumisip, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"SUMISIP (BASILAN)","deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / BOSH MEGATRADE AND SERVICES CO.","c":49113586.1,"abc":49143590.0,"fy":"2023","sd":"05/11/2023","cd":"2024-04-01","lat":6.4737,"lon":122.0213,"sm":1495,"fm":1495,"tm":1495,"am":1495,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":268},{"i":351,"cid":"24JH0034","pid":"P00835755MN","t":"Construction of Slope Protection, Barangay Buli Buli, Sumisip, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"SUMISIP (BASILAN)","deo":"Isabela City District Engineering Office","co":"BOSH MEGATRADE AND SERVICES CO.","c":24107610.26,"abc":24125000.0,"fy":"2024","sd":"06/06/2024","cd":"2024-11-14","lat":6.4205,"lon":122.0433,"sm":1495,"fm":1495,"tm":1495,"am":1495,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buli Buli","len":null,"ph":null,"dup":[352],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 63,702,967.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1119},{"i":352,"cid":"23JH0003","pid":"P00732467MN","t":"Construction of Flood Control Structure, Barangay Buli-Buli, Sumisip, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"SUMISIP (BASILAN)","deo":"Isabela City District Engineering Office","co":"BOSH MEGATRADE AND SERVICES CO.","c":39595356.53,"abc":39600000.0,"fy":"2023","sd":"03/02/2023","cd":"2024-03-31","lat":6.4205,"lon":122.0433,"sm":1495,"fm":1495,"tm":1495,"am":1495,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buli-Buli","len":null,"ph":null,"dup":[351],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 63,702,967.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1110},{"i":353,"cid":"23JH0030","pid":"P00733984MN","t":"Construction of Flood Control Structure, Bohe Basilan Bridge, Tipo-Tipo, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"TIPO-TIPO (BASILAN)","deo":"Isabela City District Engineering Office","co":"BOSH MEGATRADE AND SERVICES CO.","c":27040410.0,"abc":27091410.0,"fy":"2023","sd":"05/11/2023","cd":"2023-11-29","lat":6.483976,"lon":122.087679,"sm":1572,"fm":1572,"tm":1572,"am":1614,"md":3.7,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.69,"value":3.7,"text":"The pin is 3.7 km outside Tipo-Tipo, Basilan, the nearest municipality the record claims. It falls in Ungkaya Pukan, Basilan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":332},{"i":354,"cid":"23JH0015","pid":"P00734382MN","t":"Construction of Seawall, Barangay Balas, Lamitan City, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"CITY OF LAMITAN (BASILAN)","deo":"Isabela City District Engineering Office","co":"MMP CONSTRUCTION AND SUPPLIES","c":9779883.56,"abc":9800000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-07-05","lat":6.6934,"lon":122.1298,"sm":394,"fm":394,"tm":394,"am":394,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":269},{"i":355,"cid":"22GM0062","pid":"P00538301VS","t":"Repair/ Rehabilitation/ Reconstruction of Langub Bridge Protection and Approaches damaged by Typhoon Odette, Sipalay City, Negros Occidental","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"City of Sipalay","deo":"Negros Occidental 3rd District Engineering Office","co":"RHT CONSTRUCTION AND SUPPLIES","c":5751010.14,"abc":5751010.1,"fy":"2021","sd":"04/13/2022","cd":"2022-08-31","lat":9.775,"lon":122.3972,"sm":421,"fm":null,"tm":421,"am":421,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":270},{"i":356,"cid":"22HK0045","pid":"P00620279VS","t":"Construction of Tanjay River Control, Tanjay City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF TANJAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":59904305.0,"abc":59904305.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-19","lat":9.526856,"lon":123.162869,"sm":431,"fm":431,"tm":431,"am":431,"md":0.0,"ls":"inside","ww":"Tanjay","wn":"Tanjay River","wd":0.04,"wp":[9.52719,123.16295],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":271},{"i":357,"cid":"23HF0113","pid":"P00746103VS","t":"Reconstruction of Flood Control along Santander-Barili-Toledo Road, K0065+400 - K0065+700","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BARILI (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"QM BUILDERS","c":92108285.0,"abc":92108285.0,"fy":"2023","sd":"01/09/2024","cd":"2024-11-08","lat":10.107193,"lon":123.476029,"sm":164,"fm":164,"tm":null,"am":164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":272},{"i":358,"cid":"24MH0029","pid":"P00833602MN","t":"Construction of Flood Control  Structure, Barangay Tran, Lebak, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LEBAK (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"JV CONSTECH","c":4924487.07,"abc":4950000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-02","lat":6.7499,"lon":124.041,"sm":766,"fm":766,"tm":766,"am":490,"md":0.92,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tran","len":null,"ph":null,"dup":[359],"run":[],"cl":[],"L":"field","s":15,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 9,874,487.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1135},{"i":359,"cid":"23MH0080","pid":"P00734416MN","t":"Construction of Flood Control, Brgy. Tran, Lebak, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LEBAK (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"JV CONSTECH","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-15","lat":6.7499,"lon":124.041,"sm":766,"fm":766,"tm":766,"am":490,"md":0.92,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tran","len":null,"ph":null,"dup":[358],"run":[],"cl":[],"L":"field","s":15,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 9,874,487.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1136},{"i":360,"cid":"23M00096","pid":"P00721320MN","t":"Construction of Riverbank Protection (Revetment) along Tamontaka River, (Semba- Linek River Section- Phase II), Datu Odin Sinsuat, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU ODIN SINSUAT (DINAIG) (CAPITAL) (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":109380392.3,"abc":109696375.0,"fy":"2023","sd":"07/20/2023","cd":"2024-05-04","lat":7.19098,"lon":124.21513,"sm":492,"fm":492,"tm":492,"am":492,"md":0.0,"ls":"inside","ww":"Tamontaka","wn":"Tamontaka River","wd":0.13,"wp":[7.1917,124.21605],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":273},{"i":361,"cid":"22M00020","pid":"P00620244MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase I), Datu Odin Sinsuat, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":81574238.89,"abc":82024859.0,"fy":"2022","sd":"10/12/2022","cd":"2023-07-25","lat":7.18013,"lon":124.22178,"sm":492,"fm":494,"tm":492,"am":492,"md":0.0,"ls":"inside","ww":"Tamontaka-Capiton-Tanuel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":25.34,"text":"The record contradicts itself: the title and the pin point to Datu Odin Sinsuat, Maguindanao, but the municipality field names Datu Piang, Maguindanao, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":468},{"i":362,"cid":"22M00021","pid":"P00620245MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase II), Datu Odin Sinsuat, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"AMPLEX CONSTRUCTION AND SUPPLIES / KEY GENERAL MERCHANDISE AND CONSTRUCTION SERVICES","c":81999595.28,"abc":82024542.28,"fy":"2022","sd":"10/26/2022","cd":"2023-08-10","lat":7.17737,"lon":124.22379,"sm":492,"fm":494,"tm":492,"am":492,"md":0.0,"ls":"inside","ww":"Tamontaka-Capiton-Tanuel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":25.02,"text":"The record contradicts itself: the title and the pin point to Datu Odin Sinsuat, Maguindanao, but the municipality field names Datu Piang, Maguindanao, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":469},{"i":363,"cid":"22M00022","pid":"P00620246MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase III), Datu Odin Sinsuat, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"DCD BUILDERS & ENTERPISES / CORICS CONSTRUCTION","c":81223898.37,"abc":82024630.37,"fy":"2022","sd":"10/12/2022","cd":"2023-12-22","lat":7.17508,"lon":124.22695,"sm":492,"fm":494,"tm":492,"am":492,"md":0.0,"ls":"inside","ww":"Tamontaka-Capiton-Tanuel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.6,"text":"The record contradicts itself: the title and the pin point to Datu Odin Sinsuat, Maguindanao, but the municipality field names Datu Piang, Maguindanao, 25 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":470},{"i":364,"cid":"23M00183","pid":"P00734032MN","t":"Repair of riverbank revetment, Brgy. Macaguiling, Sultan Kudarat, Maguindanao","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"SULTAN KUDARAT (NULING) (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"ISFB CONSTRUCTION","c":9505468.74,"abc":9800000.0,"fy":"2023","sd":"08/25/2023","cd":"2024-01-22","lat":7.26545,"lon":124.25524,"sm":1490,"fm":1490,"tm":1490,"am":1490,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macaguiling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":274},{"i":365,"cid":"24M00052","pid":"P00820356MN","t":"Construction of Riverbank Protection (Phase I), Datu Piang, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / H-ROYAL CONSTRUCTION","c":47283436.87,"abc":48250000.0,"fy":"2024","sd":"03/18/2024","cd":"2025-03-03","lat":7.04914,"lon":124.46903,"sm":494,"fm":494,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":275},{"i":366,"cid":"22M00116","pid":"P00633902MN","t":"Construction of Flood Control Structure, Butalo, Datu Salibo, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU SALIBO (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":91674665.27,"abc":96499647.65,"fy":"2022","sd":"09/23/2022","cd":"2023-08-13","lat":6.98946,"lon":124.479906,"sm":495,"fm":495,"tm":495,"am":495,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":276},{"i":367,"cid":"21M00115","pid":"P00522108MN","t":"Construction of Riverbank Protection (Revetment) along Butalo River Phase I,  Datu Salibo, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Datu Salibo","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":23995000.03,"abc":24119799.72,"fy":"2021","sd":"06/21/2022","cd":"2022-12-13","lat":6.98845,"lon":124.48294,"sm":495,"fm":null,"tm":495,"am":495,"md":0.0,"ls":"inside","ww":"Butalo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":277},{"i":368,"cid":"22M00120","pid":"P00632318MN","t":"Construction of River Bank Protection (Revetment) Phase 1, Datu Piang, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":91674403.59,"abc":96499372.19,"fy":"2022","sd":"09/23/2022","cd":"2023-07-24","lat":7.017778,"lon":124.4975,"sm":494,"fm":494,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":278},{"i":369,"cid":"21M00114","pid":"P00522107MN","t":"Construction of Riverbank Protection (Revetment) Phase I,  Datu Piang, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Datu Piang","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":23995000.0,"abc":24095997.89,"fy":"2021","sd":"06/21/2022","cd":"2022-12-26","lat":7.03017,"lon":124.49931,"sm":494,"fm":null,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":279},{"i":370,"cid":"23MD0044","pid":"P00721448MN","t":"Construction of Rio Grande de Mindanao Flood Control Project along Barangay Olandang-Kadigasan-Damatulan-Lumopog (Olandang Section-Phase IV), Midsayap, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MIDSAYAP (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / RNS CONSTRUCTION ENGINEERING","c":92286809.99,"abc":93219000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-01-29","lat":7.032273,"lon":124.499711,"sm":973,"fm":973,"tm":973,"am":494,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Olandang-Kadigasan-Damatulan-Lumopog","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":280},{"i":371,"cid":"22M00051","pid":"P00620243MN","t":"Construction of Revetment along Rio Grande de Mindanao (Upstream), Brgy. Reina Regente, Datu Piang, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":78620793.02,"abc":81059111.69,"fy":"2022","sd":"04/13/2022","cd":"2023-07-24","lat":7.026585,"lon":124.506815,"sm":494,"fm":494,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Reina Regente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":281},{"i":372,"cid":"22M00050","pid":"P00620242MN","t":"Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase II), Datu Piang, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":78992559.63,"abc":81059585.8,"fy":"2022","sd":"04/13/2022","cd":"2023-08-14","lat":7.024211,"lon":124.5081,"sm":494,"fm":494,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buayan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":282},{"i":373,"cid":"22M00049","pid":"P00620241MN","t":"Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase I), Datu Piang, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":79932563.97,"abc":82024233.29,"fy":"2022","sd":"04/13/2022","cd":"2023-02-27","lat":7.022578,"lon":124.5118,"sm":494,"fm":494,"tm":494,"am":494,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buayan","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":283},{"i":374,"cid":"23MD0043","pid":"P00721449MN","t":"Construction of Rio Grande de Mindanao Flood Control Project (Macasendeg Section), Macasendeg, Midsayap, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MIDSAYAP (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":57324045.23,"abc":57900000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-27","lat":7.031422,"lon":124.52027,"sm":973,"fm":973,"tm":973,"am":973,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":284},{"i":375,"cid":"23I00014","pid":"P00721575VS","t":"Construction of Carigara Tide Embankment, Carigara, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CARIGARA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":123519982.6,"abc":123519481.0,"fy":"2023","sd":"03/15/2023","cd":"2024-07-19","lat":11.304888,"lon":124.685579,"sm":335,"fm":335,"tm":335,"am":335,"md":0.21,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":285},{"i":376,"cid":"21I00015","pid":"P00521566VS","t":"Construction of Carigara Tide Embankment, Sta. 0+150-Sta.0+283, Carigara, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Carigara","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":92505676.69,"abc":96399769.32,"fy":"2021","sd":"05/08/2021","cd":"2024-03-22","lat":11.304773,"lon":124.686788,"sm":335,"fm":null,"tm":335,"am":335,"md":0.21,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":133.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":286},{"i":377,"cid":"23M00121","pid":"P00721321MN","t":"Construction of Tunggol Protection Dike, Phase 3, Datu Montawal, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"PAGAGAWAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":74329125.0,"abc":75270000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-09-25","lat":7.08379,"lon":124.73902,"sm":1055,"fm":1055,"tm":null,"am":1055,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":287},{"i":378,"cid":"23M00120","pid":"P00721323MN","t":"Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package B-Phase 4, Datu Montawal, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"PAGAGAWAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":47646875.0,"abc":48250000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-10-19","lat":7.08395,"lon":124.73995,"sm":1055,"fm":1055,"tm":null,"am":1055,"md":0.0,"ls":"inside","ww":"Tunggol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":288},{"i":379,"cid":"23M00119","pid":"P00721322MN","t":"Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package A-Phase 2, Pagalungan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"PAGALUNGAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":47646875.0,"abc":48250000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-09-15","lat":7.07819,"lon":124.74046,"sm":1056,"fm":1056,"tm":1056,"am":1056,"md":0.0,"ls":"inside","ww":"Tunggol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":289},{"i":380,"cid":"21M00116","pid":"P00522109MN","t":"Construction of River Protection Phase I, Barangay Tumbao, Mangudadatu, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Mangudadatu","deo":"Cotabato City District Engineering Office","co":"STONELINE CONSTRUCTION (FORMERLY: ABUBAKAR ENGINEERING EXPONENT)","c":21591512.98,"abc":24124331.49,"fy":"2021","sd":"05/31/2022","cd":"2022-12-27","lat":6.63837,"lon":124.79156,"sm":918,"fm":null,"tm":918,"am":918,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumbao","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":290},{"i":381,"cid":"22M00119","pid":"P00633905MN","t":"Construction of Flood Control Structure, Maslabeng Phase II, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":96499063.51,"abc":96499984.13,"fy":"2022","sd":"10/05/2022","cd":"2023-04-24","lat":6.68203,"lon":124.80727,"sm":252,"fm":252,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":291},{"i":382,"cid":"22M00048","pid":"P00620088MN","t":"Construction of Flood Control, Maslabeng Phase II, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":81000521.2,"abc":81059935.47,"fy":"2022","sd":"04/12/2022","cd":"2023-02-27","lat":6.665469,"lon":124.810495,"sm":252,"fm":252,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":292},{"i":383,"cid":"22M00052","pid":"P00631075MN","t":"Construction of River Bank Protection (Riprap) at Barangay Maslabeng, Buluan, Maguindanao","w":"Construction of Slope Protection Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":49399692.3,"abc":49499405.92,"fy":"2022","sd":"04/13/2022","cd":"2022-12-18","lat":6.667944,"lon":124.810588,"sm":252,"fm":252,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maslabeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":293},{"i":384,"cid":"24IJ0035","pid":"P00820418VS","t":"Construction of Flood Control Structure along Gandara River (Downstream), Barangay Minda, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JUPA CONSTRUCTION","c":40694013.14,"abc":40894420.0,"fy":"2024","sd":"04/22/2024","cd":"2024-11-21","lat":12.01995,"lon":124.811734,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.03,"wp":[12.01992,124.812],"wst":"matched","br":"Minda","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":294},{"i":385,"cid":"22M00047","pid":"P00620087MN","t":"Construction of Flood Control, Maslabeng Phase I, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":80831781.63,"abc":81059129.86,"fy":"2022","sd":"05/23/2022","cd":"2023-04-04","lat":6.663677,"lon":124.812763,"sm":252,"fm":252,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":295},{"i":386,"cid":"20MA0105","pid":"P00444687MN","t":"Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Buluan","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":48512932.29,"abc":48995449.04,"fy":"2020","sd":"09/24/2020","cd":"2023-02-27","lat":6.6639,"lon":124.81298,"sm":252,"fm":null,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maslabeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":296},{"i":387,"cid":"20MA0105","pid":"P00444687MN","t":"Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Buluan","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":48512932.29,"abc":48995449.04,"fy":"2021","sd":"09/24/2020","cd":"2023-02-27","lat":6.6639,"lon":124.81298,"sm":252,"fm":null,"tm":252,"am":252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maslabeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":297},{"i":388,"cid":"22M00046","pid":"P00620086MN","t":"Construction of Flood Control Structure, Calian, Mangudadatu, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"MANGUDADATU (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / RNS CONSTRUCTION ENGINEERING","c":80300725.51,"abc":81059486.75,"fy":"2022","sd":"03/14/2022","cd":"2023-01-30","lat":6.692464,"lon":124.840923,"sm":918,"fm":918,"tm":918,"am":918,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":298},{"i":389,"cid":"20MA0119","pid":"P00444655MN","t":"Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Mangudadatu","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":48600631.28,"abc":48998194.27,"fy":"2020","sd":"10/22/2020","cd":"2023-02-27","lat":6.69234,"lon":124.84118,"sm":918,"fm":null,"tm":918,"am":918,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":299},{"i":390,"cid":"20MA0119","pid":"P00444655MN","t":"Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"Mangudadatu","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":48600631.28,"abc":48998194.27,"fy":"2021","sd":"10/22/2020","cd":"2023-02-27","lat":6.69234,"lon":124.84118,"sm":918,"fm":null,"tm":918,"am":918,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":300},{"i":391,"cid":"22M00118","pid":"P00633904MN","t":"Construction of Flood Control Structure, Maslabeng Phase I, Buluan, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":96499939.49,"abc":96499999.83,"fy":"2022","sd":"10/05/2022","cd":"2023-04-24","lat":6.69987,"lon":124.8412,"sm":252,"fm":252,"tm":252,"am":918,"md":1.04,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":301},{"i":392,"cid":"24M00051","pid":"P00820105MN","t":"Construction of River Bank Protection along Alip River (Phase I), Datu Paglas, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"DATU PAGLAS (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"PATE-KHAY CONSTRUCTION","c":96008853.82,"abc":96500000.0,"fy":"2024","sd":"05/20/2024","cd":"2025-02-11","lat":6.73991,"lon":124.86715,"sm":493,"fm":493,"tm":493,"am":493,"md":0.0,"ls":"inside","ww":"Alip","wn":"Alip River","wd":0.02,"wp":[6.73992,124.86731],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":302},{"i":393,"cid":"22IK0053","pid":"P00630686VS","t":"Construction of Coastal Dike/Shoreline Protection (Esplanade) in Barangay Poblacion, Villareal, Samar","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"VILLAREAL (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":14847437.16,"abc":14699999.97,"fy":"2022","sd":"02/28/2022","cd":"2022-12-16","lat":11.569722,"lon":124.929167,"sm":1633,"fm":1633,"tm":1633,"am":1633,"md":0.13,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01003,"text":"Contract cost is 1.00% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":945},{"i":394,"cid":"21IL0133","pid":"P00549877VS","t":"Construction of Road Slope Protection along Ichon-Sindangan-Guinabonan-Maningning Road, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":null,"deo":"Southern Leyte 1st District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC. / MORTAR MASTERS & CONCRETE BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"11/22/2021","cd":"2022-10-07","lat":10.123653,"lon":124.930859,"sm":null,"fm":null,"tm":null,"am":853,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":7},{"i":395,"cid":"22IM0036","pid":"P00620235VS","t":"Construction of Shore Protection, Magsaysay Boulevard, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48998750.0,"abc":48996130.43,"fy":"2022","sd":"02/23/2022","cd":"2023-05-13","lat":11.252502,"lon":125.004252,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":303},{"i":396,"cid":"21IL0137","pid":"P00549876VS","t":"Construction of Slope Protection along Padre Burgos, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":null,"deo":"Southern Leyte 1st District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC. / MORTAR MASTERS & CONCRETE BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"11/22/2021","cd":"2022-11-20","lat":10.055536,"lon":125.023401,"sm":null,"fm":null,"tm":null,"am":1051,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":8},{"i":397,"cid":"23I00073","pid":"P00721593VS","t":"Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.5 to 4+866.5), Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":151771943.3,"abc":151772091.0,"fy":"2023","sd":"08/09/2023","cd":"2025-02-15","lat":11.212309,"lon":125.02789,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":180.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":304},{"i":398,"cid":"22LB0415","pid":"P00634138MN","t":"Construction of Seawall from San Jose connecting Seawall of Brgy. Leon Garcia, San Jose, IKP & MASEA, Brgy. Gov. Vicente Duterte, Agdao, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":9900000.0,"abc":9900000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-03-15","lat":7.087366,"lon":125.635529,"sm":500,"fm":500,"tm":500,"am":500,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Leon Garcia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":305},{"i":399,"cid":"21ND0106","pid":"P00538309MN","t":"Rehabilitation of National Roads with Slips, Slope Collapse and Landslide along Daang Maharlika Road - K1240+500 - K1240+746.60, Butuan City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"Butuan City","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":7085328.3,"abc":7085332.41,"fy":"2021","sd":"03/22/2022","cd":"2022-10-24","lat":8.913132,"lon":125.645759,"sm":268,"fm":null,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":306},{"i":400,"cid":"22CL0088","pid":"P00637032LZ","t":"Construction of Slope Protection along Botolan-Capaz Road, Zambales, Package 1","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"BOTOLAN (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":92634459.47,"abc":96499359.64,"fy":"2022","sd":"06/24/2022","cd":"2023-05-29","lat":15.771535,"lon":120.058717,"sm":230,"fm":230,"tm":null,"am":1375,"md":45.28,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":45.28,"text":"The pin is 45.3 km outside Botolan, Zambales, the nearest municipality the record claims. It falls in Santa Cruz, Zambales.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":108},{"i":401,"cid":"22CL0032","pid":"P00620844LZ","t":"Construction of Slope Protection/Flood Control at Pamatawan River Downstream, San Miguel, San Antonio, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN ANTONIO (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":72260538.6,"abc":72278365.91,"fy":"2022","sd":"02/23/2022","cd":"2022-09-26","lat":14.948337,"lon":120.060371,"sm":1257,"fm":1257,"tm":1257,"am":1257,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.06,"wp":[14.94782,120.06036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":307},{"i":402,"cid":"23CL0127","pid":"P00740641LZ","t":"Construction of Retaining Wall Boundary of Purok 1 and Purok 7, Barangay Pundaquit, San Antonio Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN ANTONIO (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"KAEE CONSTRUCTION SERVICES","c":19286075.3,"abc":19599661.31,"fy":"2023","sd":"05/23/2023","cd":"2024-01-12","lat":14.91818,"lon":120.064146,"sm":1257,"fm":1257,"tm":null,"am":1257,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pundaquit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":308},{"i":403,"cid":"24EE0019","pid":"P00820978LZ","t":"Construction of Slope Protection Structure along Nagbaril Bridge 1, Coron, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"CORON (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) / ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION)","c":44079742.82,"abc":44099999.16,"fy":"2024","sd":"02/14/2024","cd":"2024-07-26","lat":12.02481,"lon":120.06715,"sm":458,"fm":458,"tm":458,"am":458,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":309},{"i":404,"cid":"23CL0097","pid":"P00742378LZ","t":"Construction of Slope Protection Structure along Bukas River, Sitio Anangka, Barangay Rosete, San Felipe, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN FELIPE (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"VM BUILDERS CONSTRUCTION CORPORATION","c":9721105.3,"abc":9899246.88,"fy":"2023","sd":"04/24/2023","cd":"2023-10-16","lat":15.065408,"lon":120.076859,"sm":1270,"fm":1270,"tm":1270,"am":1270,"md":0.0,"ls":"inside","ww":"Bukas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rosete","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":310},{"i":405,"cid":"24CL0038","pid":"P00824713LZ","t":"Construction of Slope Protection along Sto. Tomas River Brgy. Rosete Phase 2, San Felipe, Zambales","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN FELIPE (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"VM BUILDERS CONSTRUCTION CORPORATION","c":28515722.18,"abc":28949971.76,"fy":"2024","sd":"02/22/2024","cd":"2024-05-17","lat":15.065385,"lon":120.076959,"sm":1270,"fm":1270,"tm":1270,"am":1270,"md":0.0,"ls":"inside","ww":"Sto. Tomas","wn":"Santo Tomas River","wd":3.29,"wp":[15.03581,120.07427],"wst":"matched","br":"Rosete Phase 2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.29,"text":"The title names Sto. Tomas, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":409},{"i":406,"cid":"23CL0137","pid":"P00740323LZ","t":"Construction of Dinumagat River Flood Controls Structure, Downstream, Package 2, San Antonio, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN ANTONIO (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":72374965.08,"abc":72374705.67,"fy":"2023","sd":"05/31/2023","cd":"2023-12-11","lat":14.96213,"lon":120.087317,"sm":1257,"fm":1257,"tm":1257,"am":1257,"md":0.0,"ls":"inside","ww":"Dinumagat","wn":"Dinumagat River","wd":0.0,"wp":[14.96209,120.08732],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":311},{"i":407,"cid":"23C00073","pid":"P00725702LZ","t":"Construction of Flood Control Structure at Sagpat River (Maloma Section), San Felipe, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN FELIPE (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":96500000.0,"abc":96499963.12,"fy":"2023","sd":"06/05/2023","cd":"2024-03-30","lat":15.106471,"lon":120.099214,"sm":1270,"fm":1270,"tm":1270,"am":1270,"md":0.0,"ls":"inside","ww":"Sagpat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":312},{"i":408,"cid":"24EE0053","pid":"P00820976LZ","t":"Construction of Slope Protection Structure along Labangan Bridge 1, Coron, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"CORON (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"ALPHA VECTOR CONSTRUCTION AND SUPPLY / JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":44098571.94,"abc":44099998.89,"fy":"2024","sd":"02/14/2024","cd":"2024-08-21","lat":12.04441,"lon":120.1548,"sm":458,"fm":458,"tm":458,"am":458,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":313},{"i":409,"cid":"23EE0031","pid":"P00726768LZ","t":"Construction of Labangan Bridge I Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 229.02, Coron, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"CORON (PALAWAN)","deo":"Palawan 1st District Engineering Office","co":"JRMX CONSTRUCTION & GENERAL MERCHANDISE","c":20088519.55,"abc":20089948.32,"fy":"2023","sd":"05/31/2023","cd":"2024-10-01","lat":12.047626,"lon":120.155234,"sm":458,"fm":458,"tm":458,"am":458,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":229.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":314},{"i":410,"cid":"22CL0021","pid":"P00620554LZ","t":"Construction of Maculcol River Dike, Upstream, North Approach, San Narciso, Zambales","w":"Construction of Dike","rg":"Region III","pv":"ZAMBALES","mu":"SAN NARCISO (ZAMBALES)","deo":"Zambales 1st District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":48999754.56,"abc":48998584.87,"fy":"2022","sd":"03/02/2022","cd":"2022-09-10","lat":15.000472,"lon":120.15882,"sm":1338,"fm":1338,"tm":1338,"am":1338,"md":0.0,"ls":"inside","ww":"Maculcol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":315},{"i":411,"cid":"22CM0061","pid":"P00620852LZ","t":"Rehabilitation of Flood Mitigation and Drainage System of Pamatawan River (Looc Section), Sta. 18+690 - Sta. 19+090, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":77199999.49,"abc":77199184.38,"fy":"2022","sd":"03/24/2022","cd":"2022-08-22","lat":14.910144,"lon":120.16861,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.02,"wp":[14.9102,120.16844],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":316},{"i":412,"cid":"22CM0062","pid":"P00620853LZ","t":"Rehabilitation of Flood Mitigation and Drainage System of Pamatawan River (San Agustin Section), Sta. 21+974 - Sta. 22+374, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":77199999.88,"abc":77199667.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-22","lat":14.906849,"lon":120.180165,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.09,"wp":[14.90668,120.181],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":317},{"i":413,"cid":"23CM0016","pid":"P00725740LZ","t":"Rehabilitation of Camachile River (Downstream), Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":67549998.17,"abc":67549142.65,"fy":"2023","sd":"02/14/2023","cd":"2023-05-09","lat":14.9504,"lon":120.18022,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Camachile","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":318},{"i":414,"cid":"22CM0019","pid":"P00620854LZ","t":"Rehabilitation of Pamatawan River (Alindayat Section), Sta. 22+374 - Sta. 22+844, Brgy. San Agustin, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":82024999.11,"abc":82449318.3,"fy":"2022","sd":"02/21/2022","cd":"2022-08-13","lat":14.906849,"lon":120.180683,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.04,"wp":[14.90678,120.18102],"wst":"matched","br":"San Agustin","len":470.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":319},{"i":415,"cid":"23CM0024","pid":"P00726517LZ","t":"Rehabilitation of Pamatawan River Downstream ( Old San Agustin Section), Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":96499859.1,"abc":96499334.12,"fy":"2023","sd":"02/14/2023","cd":"2023-05-14","lat":14.9093,"lon":120.1835,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.01,"wp":[14.90927,120.18355],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":320},{"i":416,"cid":"22CM0063","pid":"P00620198LZ","t":"Rehabilitation of Flood Mitigation and Drainage System of Camachile River (Upstream), Sta. 19+964 - Sta. 20+129, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":77199999.95,"abc":77199039.61,"fy":"2022","sd":"03/24/2022","cd":"2022-08-22","lat":14.956096,"lon":120.192427,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Camachile","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":165.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":321},{"i":417,"cid":"22CM0065","pid":"P00620199LZ","t":"Rehabilitation of Flood Mitigation and Drainage System of Camachile River (Upstream), Sta. 21+960 - Sta. 22+128, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":77199999.54,"abc":77199636.62,"fy":"2022","sd":"03/24/2022","cd":"2022-11-27","lat":14.955054,"lon":120.193966,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Camachile","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":168.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":322},{"i":418,"cid":"24CM0024","pid":"P00825099LZ","t":"Rehabilitation of San Juan Creek, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION)","c":77199613.07,"abc":77199351.32,"fy":"2024","sd":"02/14/2024","cd":"2024-11-09","lat":14.932212,"lon":120.197541,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan Creek","wd":0.0,"wp":[14.93221,120.19754],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":323},{"i":419,"cid":"24CM0028","pid":"P00825245LZ","t":"Improvement of Drainage Outfall System connecting National Highway, San Juan, Castillejos Zambales","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION)","c":19599347.92,"abc":19599791.58,"fy":"2024","sd":"02/16/2024","cd":"2024-11-25","lat":14.93389,"lon":120.198837,"sm":349,"fm":349,"tm":null,"am":349,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":324},{"i":420,"cid":"23CM0050","pid":"P00726919LZ","t":"Rehabilitation of Camachile River (PRMSU Section), San Marcelino, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN MARCELINO (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":67549976.8,"abc":67549783.44,"fy":"2023","sd":"03/15/2023","cd":"2023-06-09","lat":14.96716,"lon":120.19953,"sm":1326,"fm":1326,"tm":1326,"am":1326,"md":0.0,"ls":"inside","ww":"Camachile","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":325},{"i":421,"cid":"24CM0026","pid":"P00825101LZ","t":"Improvement of Cawag River, Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION)","c":96499979.14,"abc":96499795.17,"fy":"2024","sd":"02/14/2024","cd":"2024-12-24","lat":14.867562,"lon":120.205201,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Cawag","wn":"Cawag River","wd":0.01,"wp":[14.86748,120.20514],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":326},{"i":422,"cid":"24CM0077","pid":"P00823350LZ","t":"Improvement of Sto. Tomas River (Sta. Fe Section) San Marcelino, Zambales Phase 2","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SAN MARCELINO (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) / THREE W BUILDERS, INC.","c":192999998.6,"abc":192999874.1,"fy":"2024","sd":"05/30/2024","cd":"2024-11-24","lat":15.01182,"lon":120.21105,"sm":1326,"fm":1326,"tm":null,"am":1326,"md":0.0,"ls":"inside","ww":"Sto. Tomas","wn":"Santo Tomas River","wd":3.39,"wp":[14.98275,120.20129],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.39,"text":"The title names Sto. Tomas, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":283},{"i":423,"cid":"22CM0021","pid":"P00620856LZ","t":"Rehabilitation of Pamatawan River, Sta. 30+540 - Sta. 30+935, Brgy. Del Pilar, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION)","c":67549948.39,"abc":67899591.99,"fy":"2022","sd":"02/24/2022","cd":"2022-09-21","lat":14.93125,"lon":120.213237,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.02,"wp":[14.93131,120.21338],"wst":"matched","br":"Del Pilar","len":395.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":327},{"i":424,"cid":"22CM0020","pid":"P00620855LZ","t":"Rehabilitation of Pamatawan River (Caballucan Section), Sta. 30+935 - Sta. 31+419, Brgy. San Pablo, Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":82024973.17,"abc":82449456.39,"fy":"2022","sd":"02/18/2022","cd":"2022-08-24","lat":14.933617,"lon":120.2134,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.0,"wp":[14.93362,120.21344],"wst":"matched","br":"San Pablo","len":484.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":328},{"i":425,"cid":"23CM0017","pid":"P00726518LZ","t":"Rehabilitation of Pamatawan River Upstream ( Kanaynayan Section), Castillejos, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"CASTILLEJOS (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":49214867.35,"abc":49214932.34,"fy":"2023","sd":"02/14/2023","cd":"2023-08-28","lat":14.9302,"lon":120.2143,"sm":349,"fm":349,"tm":349,"am":349,"md":0.0,"ls":"inside","ww":"Pamatawan","wn":"Pamatawan River","wd":0.04,"wp":[14.93057,120.21445],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":329},{"i":426,"cid":"23A00260","pid":"P00737423LZ","t":"Rehabilitation of Flood Control System, Barangay Salasa, Bugallon, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"GEORAVIN CONSTRUCTION & SUPPLIES / ALCEL CONSTRUCTION","c":34649388.88,"abc":34650000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-09-25","lat":15.974325,"lon":120.21766,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salasa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":330},{"i":427,"cid":"23CM0026","pid":"P00727155LZ","t":"Improvement of Flood Control Structure along Talos Creek (Downstream), Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION)","c":48588399.53,"abc":48588038.51,"fy":"2023","sd":"03/03/2023","cd":"2023-07-27","lat":14.92433,"lon":120.22198,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Talos","wn":"Talos Creek","wd":0.0,"wp":[14.92433,120.22201],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":331},{"i":428,"cid":"23A00259","pid":"P00737424LZ","t":"Rehabilitation of Flood Control System, Barangay Bañaga, Bugallon, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ALCEL CONSTRUCTION","c":34649416.67,"abc":34650000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-12-23","lat":15.9883,"lon":120.223,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bañaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":332},{"i":429,"cid":"23CM0022","pid":"P00725741LZ","t":"Rehabilitation of Cabaoangan Creek, Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":77199858.11,"abc":77199352.81,"fy":"2023","sd":"02/14/2023","cd":"2023-07-07","lat":14.8907,"lon":120.2248,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Cabaoangan","wn":"Cabaongan Creek","wd":0.0,"wp":[14.89074,120.22481],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":333},{"i":430,"cid":"22CM0054","pid":"P00637078LZ","t":"Improvement of Drainage Structure, Talos Creek, Pamatawan River, Subic, Zambales","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION)","c":48999925.14,"abc":48999837.71,"fy":"2022","sd":"03/24/2022","cd":"2022-09-19","lat":14.927034,"lon":120.226876,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Talos","wn":"Talos Creek","wd":0.08,"wp":[14.92722,120.2262],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":334},{"i":431,"cid":"22AH0015","pid":"P00620960LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. Angarian, Bugallon, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"PANGASINAN NEW WILSON LUMBER & CONSTRUCTION SUPPLY","c":29395977.64,"abc":29400000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-09-29","lat":15.975562,"lon":120.236374,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.15,"wp":[15.9744,120.23563],"wst":"matched","br":"Angarian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":335},{"i":432,"cid":"23CM0015","pid":"P00725742LZ","t":"Rehabilitation of Calapacuan River, Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":67549986.63,"abc":67549574.77,"fy":"2023","sd":"02/14/2023","cd":"2023-05-10","lat":14.8619,"lon":120.2391,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Calapacuan","wn":"Calapacuan River","wd":0.0,"wp":[14.86191,120.23909],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":336},{"i":433,"cid":"22AH0014","pid":"P00620959LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. Bolaoen, Bugallon, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"PANGASINAN NEW WILSON LUMBER & CONSTRUCTION SUPPLY","c":29397122.87,"abc":29400000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-11-25","lat":15.942356,"lon":120.239424,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.11,"wp":[15.94223,120.24042],"wst":"matched","br":"Bolaoen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":337},{"i":434,"cid":"22AH0016","pid":"P00620961LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. Umanday, Bugallon, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ALCEL CONSTRUCTION","c":39196253.39,"abc":39200000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-11-25","lat":15.945679,"lon":120.240093,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.11,"wp":[15.94546,120.24112],"wst":"matched","br":"Umanday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":338},{"i":435,"cid":"24CM0025","pid":"P00825100LZ","t":"Improvement of Calapacuan River, Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":96499707.06,"abc":96499504.04,"fy":"2024","sd":"02/14/2024","cd":"2024-05-24","lat":14.862835,"lon":120.240099,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Calapacuan","wn":"Calapacuan River","wd":0.0,"wp":[14.86281,120.24013],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":339},{"i":436,"cid":"22AH0012","pid":"P00620957LZ","t":"Construction of Riverbank Protection along Agno River Basin at Brgy. Cabayaoasan, Bugallon, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BUGALLON (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ALCEL CONSTRUCTION","c":44095038.26,"abc":44100000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-28","lat":15.958835,"lon":120.242074,"sm":242,"fm":242,"tm":242,"am":242,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.15,"wp":[15.95867,120.24346],"wst":"matched","br":"Cabayaoasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":340},{"i":437,"cid":"24CM0027","pid":"P00825244LZ","t":"Improvement of Matain River, Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"MICKAJETTE CONSTRUCTION AND TRADING","c":48999585.54,"abc":48999685.29,"fy":"2024","sd":"02/14/2024","cd":"2024-07-25","lat":14.851193,"lon":120.244241,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Matain","wn":"Matain River","wd":0.24,"wp":[14.85031,120.24627],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":341},{"i":438,"cid":"24EB0035","pid":"P00820966LZ","t":"Construction of Flood Control Structure, Barangay Burol, Looc, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"LOOC (ROMBLON)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":19599535.39,"abc":19600000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-09-08","lat":13.760887,"lon":120.24535,"sm":805,"fm":806,"tm":805,"am":805,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Burol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":245.85,"text":"The record contradicts itself: the title and the pin point to Looc, Occidental Mindoro, but the municipality field names Looc, Romblon, 246 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":598},{"i":439,"cid":"22AH0018","pid":"P00620963LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. Baybay, Aguilar, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ALCEL CONSTRUCTION","c":43320017.5,"abc":44100000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-01","lat":15.910459,"lon":120.246083,"sm":11,"fm":11,"tm":11,"am":242,"md":0.16,"ls":"boundary","ww":"Agno","wn":"Agno River","wd":0.12,"wp":[15.91068,120.2472],"wst":"matched","br":"Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":342},{"i":440,"cid":"23EB0045","pid":"P00737549LZ","t":"Construction of Flood Control Structure, Barangay Burol, Looc, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"LOOC (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":4899368.2,"abc":4900000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-04-25","lat":13.76133,"lon":120.24615,"sm":805,"fm":805,"tm":805,"am":805,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Burol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":343},{"i":441,"cid":"23EB0070","pid":"P00742454LZ","t":"Construction of Flood Control Structures, Barangay Poblacion, Looc, Mindoro Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"LOOC (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":4899326.3,"abc":4900000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-08-05","lat":13.71333,"lon":120.25684,"sm":805,"fm":805,"tm":805,"am":805,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":344},{"i":442,"cid":"23EB0025","pid":"P00727181LZ","t":"Construction of Seawall, Barangay Bonbon, Sta. 0+000 - Sta. 0+320, Looc, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"EL NIDO (BACUIT) (PALAWAN)","deo":"Mindoro Occidental District Engineering Office","co":"FAAA CONSTRUCTION AND TRADING / D.K. JOCSON CONSTRUCTION","c":48999373.17,"abc":49000000.0,"fy":"2023","sd":"03/10/2023","cd":"2024-05-10","lat":13.713448,"lon":120.256888,"sm":805,"fm":546,"tm":805,"am":805,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonbon","len":320.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":264.39,"text":"The record contradicts itself: the title and the pin point to Looc, Occidental Mindoro, but the municipality field names El Nido, Palawan, 264 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":514},{"i":443,"cid":"22CM0017","pid":"P00620205LZ","t":"Rehabilitation of Matain River I, Sta. 3+300 - Sta. 3+556.50 (Both Sides), Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION)","c":82024855.75,"abc":82024735.32,"fy":"2022","sd":"02/17/2022","cd":"2022-08-19","lat":14.86628,"lon":120.258867,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Matain","wn":"Matain River","wd":0.0,"wp":[14.86628,120.2589],"wst":"matched","br":null,"len":256.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":345},{"i":444,"cid":"22AH0033","pid":"P00632743LZ","t":"Construction of Flood Control / Drainage System, Barangay Buenlag, Binmaley, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINMALEY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ST. ALMERS CONSTRUCTION AND ENTERPRISE","c":2874135.77,"abc":2970000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-07-16","lat":16.034929,"lon":120.26191,"sm":210,"fm":210,"tm":210,"am":210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenlag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":346},{"i":445,"cid":"22CM0018","pid":"P00620206LZ","t":"Rehabilitation of Matain River I, Sta. 5+250 - Sta. 5+008 (Both Sides), Subic, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"SUBIC (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION)","c":77199747.86,"abc":77199737.36,"fy":"2022","sd":"02/17/2022","cd":"2022-07-21","lat":14.876366,"lon":120.264529,"sm":1483,"fm":1483,"tm":1483,"am":1483,"md":0.0,"ls":"inside","ww":"Matain","wn":"Matain River","wd":0.01,"wp":[14.87637,120.26458],"wst":"matched","br":null,"len":242.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":347},{"i":446,"cid":"23CM0023","pid":"P00726516LZ","t":"Rehabilitation of Kalaklan River, Olongapo City, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT","c":77199995.6,"abc":77198954.4,"fy":"2023","sd":"02/14/2023","cd":"2023-10-28","lat":14.8233,"lon":120.26808,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.07,"wp":[14.82303,120.26868],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":348},{"i":447,"cid":"24AH0130","pid":"P00845907LZ","t":"Construction of River Bank Protection, Barangay San Jose, Aguilar, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":9900000.0,"abc":9900000.0,"fy":"2024","sd":"04/03/2024","cd":"2024-05-17","lat":15.8856,"lon":120.269821,"sm":11,"fm":11,"tm":11,"am":11,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":349},{"i":448,"cid":"24A00180","pid":"P00821484LZ","t":"Construction of Flood Control Project along Agno River, Barangay San Jose, Aguilar, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"RANIA CONSTRUCTION AND SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":48249995.84,"abc":48250000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-04-19","lat":15.885592,"lon":120.269849,"sm":11,"fm":11,"tm":11,"am":11,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.1,"wp":[15.88623,120.2705],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":350},{"i":449,"cid":"22CM0005","pid":"P00620201LZ","t":"Rehabilitation of Kalaklan River, Sta.0+304 - Sta.0+788 (Right Side), Olongapo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT","c":77199029.61,"abc":77199808.4,"fy":"2022","sd":"02/24/2022","cd":"2022-10-21","lat":14.82606,"lon":120.270446,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.02,"wp":[14.82589,120.27055],"wst":"matched","br":null,"len":484.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":351},{"i":450,"cid":"22CM0052","pid":"P00621292LZ","t":"Rehabilitation of Flood Control Structure, Kalaklan River near Subic Bay Freeport Zone, Sta. 001 + 230 - Sta. 001 + 610 (Right Side), Olongapo City, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":82024373.44,"abc":82024420.48,"fy":"2022","sd":"03/24/2022","cd":"2022-09-23","lat":14.828652,"lon":120.272598,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.06,"wp":[14.82835,120.27303],"wst":"matched","br":null,"len":380.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":352},{"i":451,"cid":"22AH0017","pid":"P00620962LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. San Jose, Aguilar, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":44098697.87,"abc":44100000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-04","lat":15.873873,"lon":120.276045,"sm":11,"fm":11,"tm":11,"am":11,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.12,"wp":[15.87432,120.27705],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":353},{"i":452,"cid":"22AJ0009","pid":"P00620980LZ","t":"Construction of Slope Protection Works along Agno River, Brgy. Salinap, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48999983.45,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-26","lat":15.878792,"lon":120.276223,"sm":1261,"fm":1261,"tm":1261,"am":11,"md":0.02,"ls":"boundary","ww":"Agno","wn":"Agno River","wd":0.12,"wp":[15.87832,120.27517],"wst":"matched","br":"Salinap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":354},{"i":453,"cid":"24CM0001","pid":"P00825098LZ","t":"Rehabilitation of Kalaklan River, Olongapo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT","c":96499999.98,"abc":96499842.11,"fy":"2024","sd":"02/16/2024","cd":"2024-06-21","lat":14.833416,"lon":120.276593,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.03,"wp":[14.83332,120.27681],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":355},{"i":454,"cid":"22CM0057","pid":"P00621288LZ","t":"Construction of Flood Mitigation Structure and Drainage Structure along Kalaklan River, Sta. 2 + 670 - Sta. 2 + 920, Olongapo City, Zambales","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION)","c":48249970.41,"abc":48999957.94,"fy":"2022","sd":"03/24/2022","cd":"2022-08-29","lat":14.842755,"lon":120.282755,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.02,"wp":[14.84267,120.28295],"wst":"matched","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":356},{"i":455,"cid":"24A00201","pid":"P00821108LZ","t":"Construction of Riverbank Protection along Agno River, Barangay Panacol, Aguilar, Pangasinan, Phase III","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96499988.29,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-08","lat":15.866859,"lon":120.283251,"sm":11,"fm":11,"tm":11,"am":11,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.13,"wp":[15.86575,120.28303],"wst":"matched","br":"Panacol","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":357},{"i":456,"cid":"22CM0055","pid":"P00640458LZ","t":"Improvement of Drainage System connecting National Highway, East Bajac-Bajac, Olongapo City, Zambales","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"ALFEL CONSTRUCTION CORPORATION","c":9899964.4,"abc":9799917.08,"fy":"2022","sd":"03/24/2022","cd":"2022-07-21","lat":14.83833,"lon":120.283663,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01021,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":946},{"i":457,"cid":"22CM0066","pid":"P00620200LZ","t":"Rehabilitation of Kalaklan River, Sta. 2+720 - Sta. 3+045 (Right Side), Olongapo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":77199586.11,"abc":77198048.59,"fy":"2022","sd":"03/24/2022","cd":"2022-08-22","lat":14.843208,"lon":120.283822,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Kalaklan","wn":"Kalaklan River","wd":0.06,"wp":[14.84332,120.28324],"wst":"matched","br":null,"len":325.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":358},{"i":458,"cid":"22CM0008","pid":"P00620556LZ","t":"Rehabilitation of Mabayuan River, Sta. 3+300 - Sta. 3+414 (Both Sides), Olongapo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":39199639.49,"abc":38599328.1,"fy":"2022","sd":"02/10/2022","cd":"2022-07-09","lat":14.846512,"lon":120.286683,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Mabayuan","wn":"Mabayuan River","wd":0.01,"wp":[14.84644,120.28672],"wst":"matched","br":null,"len":114.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01555,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":796},{"i":459,"cid":"23A00233","pid":"P00727251LZ","t":"Construction of Riverbank Protection along Agno River, Barangay Panacol, Aguilar, Pangasinan, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"AGUILAR (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":57899999.6,"abc":57900000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-07-18","lat":15.86586,"lon":120.288096,"sm":11,"fm":11,"tm":11,"am":11,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.07,"wp":[15.8652,120.28805],"wst":"matched","br":"Panacol","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":359},{"i":460,"cid":"23AJ0060","pid":"P00726650LZ","t":"Construction of Protection Works along Agno River, barangay Bogaoan, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":19574868.44,"abc":19600000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-08-18","lat":15.91892,"lon":120.29095,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.82,"wp":[15.92372,120.28518],"wst":"matched","br":"Bogaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":360},{"i":461,"cid":"22CM0067","pid":"P00620202LZ","t":"Rehabilitation of Mabayuan River, Sta. 8+520.60 - Sta. 8+920.00 (Rigth Side) Olongapo City, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION)","c":38598913.89,"abc":39199700.76,"fy":"2022","sd":"03/24/2022","cd":"2022-08-28","lat":14.857453,"lon":120.29112,"sm":1036,"fm":1036,"tm":null,"am":1036,"md":0.0,"ls":"inside","ww":"Mabayuan","wn":"Mabayuan River","wd":0.07,"wp":[14.85732,120.2918],"wst":"matched","br":null,"len":399.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":361},{"i":462,"cid":"24AJ0004","pid":"P00821523LZ","t":"Construction of Slope Protection Works along Agno River, Barangay Supo, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":47618177.06,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-17","lat":15.841,"lon":120.292,"sm":1261,"fm":194,"tm":1261,"am":917,"md":0.02,"ls":"boundary","ww":"Agno","wn":"Agno River","wd":0.02,"wp":[15.84106,120.29182],"wst":"matched","br":"Supo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.59,"text":"The record contradicts itself: the title and the pin point to San Carlos City, Pangasinan, but the municipality field names Bayambang, Pangasinan, 10 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":530},{"i":463,"cid":"22AJ0011","pid":"P00620981LZ","t":"Construction of Slope Protection Works along Agno River, Brgy. Supo, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / 2-R CONSTRUCTION SUPPLY","c":48999994.57,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-07","lat":15.83614,"lon":120.29283,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.19,"wp":[15.83552,120.29118],"wst":"matched","br":"Supo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":362},{"i":464,"cid":"23AJ0044","pid":"P00726651LZ","t":"Construction of Slope Protection Works along Agno River, Barangay Supo, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":47569136.59,"abc":49000000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-12-18","lat":15.83615,"lon":120.29283,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.19,"wp":[15.83553,120.29117],"wst":"matched","br":"Supo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":363},{"i":465,"cid":"23C00288","pid":"P00742164LZ","t":"Construction of Flood Control along Tuag River, Morong, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"MORONG (BATAAN)","deo":"Bataan 3rd District Engineering Office","co":"E.R. VENZON CONSTRUCTION","c":49500000.0,"abc":49499996.81,"fy":"2023","sd":"09/11/2023","cd":"2024-02-23","lat":14.653004,"lon":120.296169,"sm":990,"fm":990,"tm":990,"am":990,"md":0.0,"ls":"inside","ww":"Tuag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":364},{"i":466,"cid":"22AH0034","pid":"P00632744LZ","t":"Construction of Flood Control / Drainage System, Barangay Camaley, Binmaley, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINMALEY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ST. ALMERS CONSTRUCTION AND ENTERPRISE","c":4947605.86,"abc":4950000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-02","lat":15.995786,"lon":120.297808,"sm":210,"fm":210,"tm":210,"am":210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camaley","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":365},{"i":467,"cid":"24AJ0017","pid":"P00821522LZ","t":"Construction of Slope Protection Works along Agno River, Barangay Guelew, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":47784593.1,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-05-14","lat":15.859,"lon":120.299,"sm":1261,"fm":194,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.04,"wp":[15.8588,120.29872],"wst":"matched","br":"Guelew","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.25,"text":"The record contradicts itself: the title and the pin point to San Carlos City, Pangasinan, but the municipality field names Bayambang, Pangasinan, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":531},{"i":468,"cid":"23AJ0052","pid":"P00726088LZ","t":"Construction of Slope Protection Works along Panaminditaan Creek, Barangay Gamata-Balaya, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION","c":19597787.66,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-03-24","lat":15.926794,"lon":120.299867,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Panaminditaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gamata-Balaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":366},{"i":469,"cid":"22CA0079","pid":"P00640512LZ","t":"Construction of Flood Control Project along Tuag River, Nagbalayong, Morong, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"MORONG (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":18809999.75,"abc":18809999.75,"fy":"2022","sd":"08/11/2022","cd":"2023-04-12","lat":14.655263,"lon":120.300502,"sm":990,"fm":990,"tm":990,"am":990,"md":0.0,"ls":"inside","ww":"Tuag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":367},{"i":470,"cid":"22AJ0004","pid":"P00620979LZ","t":"Construction of Slope Protection Works along Agno River, Brgy. Guelew, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BALLESTEROS CONSTRUCTION AND SUPPLY / J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48762586.97,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-08","lat":15.85806,"lon":120.301317,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.18,"wp":[15.85713,120.29998],"wst":"matched","br":"Guelew","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":368},{"i":471,"cid":"23AJ0035","pid":"P00726082LZ","t":"Construction of Slope Protection Works along San Juan River, Barangay Calomboyan, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19599973.46,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-03-01","lat":15.946383,"lon":120.305669,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":2.19,"wp":[15.92943,120.29507],"wst":"matched","br":"Calomboyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":369},{"i":472,"cid":"22CJ0218","pid":"P00639357LZ","t":"Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package J), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"CHIARA2300 INCORPORATED / LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D","c":94372250.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-24","lat":15.485586,"lon":120.3097,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package J","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":370},{"i":473,"cid":"22CJ0210","pid":"P00639356LZ","t":"Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package I), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"CHIARA2300 INCORPORATED / LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D","c":94381900.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-24","lat":15.485767,"lon":120.309867,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":371},{"i":474,"cid":"23AJ0055","pid":"P00726091LZ","t":"Construction of Slope Protection Works along Panaminditaan Creek, Barangay Talang, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19303732.61,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-11-17","lat":15.904457,"lon":120.310306,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Panaminditaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":372},{"i":475,"cid":"22CJ0209","pid":"P00639355LZ","t":"Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package H), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D / THREE W BUILDERS, INC.","c":94251550.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-25","lat":15.485733,"lon":120.312633,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package H","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":373},{"i":476,"cid":"22AF0010","pid":"P00631076LZ","t":"Construction of Flood Mitigation Structures along Bauang River Basin, Brgy. Pugo, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":33712619.0,"abc":34299994.43,"fy":"2022","sd":"02/18/2022","cd":"2023-11-27","lat":16.52393,"lon":120.31276,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pugo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":374},{"i":477,"cid":"22CJ0200","pid":"P00639354LZ","t":"Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package G), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D / THREE W BUILDERS, INC.","c":94261200.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-25","lat":15.486917,"lon":120.312931,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package G","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":375},{"i":478,"cid":"21CM0058","pid":"P00525600LZ","t":"Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 7+481.60 - Sta. 7+881.00 (Right Side), Olongapo City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"ZAMBALES","mu":"Olongapo City","deo":"Zambales 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":77199992.48,"abc":77199921.43,"fy":"2021","sd":"09/12/2022","cd":"2022-11-27","lat":14.862754,"lon":120.314322,"sm":1036,"fm":null,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Sta. Rita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":399.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":376},{"i":479,"cid":"22AH0013","pid":"P00620958LZ","t":"Construction of Riverbank Protection along Agno River Basin, Brgy. Dorongan Valerio, Mangatarem, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGATAREM (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ALCEL CONSTRUCTION","c":44095982.31,"abc":44100000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-04","lat":15.829111,"lon":120.314751,"sm":917,"fm":917,"tm":917,"am":917,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.19,"wp":[15.82999,120.31623],"wst":"matched","br":"Dorongan Valerio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":377},{"i":480,"cid":"22AE0015","pid":"P00620940LZ","t":"Construction of Seawall, Brgy. Pagdaraoan, San Fernando City, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MOLTE ARIES CONSTRUCTION AND INDUSTRIES","c":7463294.58,"abc":7839873.81,"fy":"2022","sd":"02/18/2022","cd":"2022-08-01","lat":16.623136,"lon":120.315445,"sm":414,"fm":414,"tm":414,"am":414,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagdaraoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":378},{"i":481,"cid":"24AJ0029","pid":"P00839560LZ","t":"Construction of Drainage, Barangay Baldog, San Carlos City, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9662405.17,"abc":9900000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-18","lat":15.877,"lon":120.317,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baldog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":379},{"i":482,"cid":"23CM0049","pid":"P00726922LZ","t":"Rehabilitation of Flood Control Structure along Sta. Rita River, Olongapo City, Zambales","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"ZAMBALES","mu":"OLONGAPO CITY (ZAMBALES)","deo":"Zambales 2nd District Engineering Office","co":"JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT","c":77199948.01,"abc":77199782.89,"fy":"2023","sd":"03/15/2023","cd":"2023-11-25","lat":14.862,"lon":120.318,"sm":1036,"fm":1036,"tm":1036,"am":1036,"md":0.0,"ls":"inside","ww":"Sta. Rita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":380},{"i":483,"cid":"23AJ0041","pid":"P00726085LZ","t":"Construction of Slope Protection Works along Libas Creek, Libas-Baldog Section, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"5J AND G CONSTRUCTION AND SUPPLY","c":19295169.83,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-07-13","lat":15.877319,"lon":120.318019,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Libas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":381},{"i":484,"cid":"23AE0017","pid":"P00737415LZ","t":"Construction of Drainage along San Fernando By-pass Road - K0267+810 - K0267+820 to Sevilla Road (Phase 1), Sevilla, City of San Fernando, La Union","w":"Construction of Drainage Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"KRB CONSTRUCTION","c":9898634.44,"abc":9899975.9,"fy":"2023","sd":"02/20/2023","cd":"2023-08-21","lat":16.605045,"lon":120.31826,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":382},{"i":485,"cid":"23AF0008","pid":"P00726639LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangays Pudoc to Parian Este, Phase 1, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"JABEN GENERAL CONTRACTING & ENG'G SERVICES","c":48977484.4,"abc":48999961.06,"fy":"2023","sd":"01/31/2023","cd":"2024-02-11","lat":16.514501,"lon":120.318281,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pudoc","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":383},{"i":486,"cid":"24AE0021","pid":"P00820116LZ","t":"Construction of Flood Control Structure along Tanqui-Biday-Carlatan Waterways, San Fernando City, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":82970000.0,"abc":84262432.59,"fy":"2024","sd":"02/14/2024","cd":"2024-07-26","lat":16.628373,"lon":120.320297,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":384},{"i":487,"cid":"23A00252","pid":"P00735957LZ","t":"Construction of Shore Protection (Groins) along Paringao, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":77199988.0,"abc":78400000.0,"fy":"2023","sd":"03/16/2023","cd":"2024-04-18","lat":16.562857,"lon":120.320574,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":385},{"i":488,"cid":"23AE0011","pid":"P00726052LZ","t":"Construction of Flood Control Structure along Tanqui-Biday-Carlatan waterways, San Fernando City, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":30370180.0,"abc":30371165.22,"fy":"2023","sd":"02/17/2023","cd":"2023-07-12","lat":16.626533,"lon":120.321134,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":386},{"i":489,"cid":"23AF0009","pid":"P00726640LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangays Pudoc to Parian Este, Phase 2, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":30865253.84,"abc":30869993.99,"fy":"2023","sd":"02/06/2023","cd":"2023-07-02","lat":16.515453,"lon":120.3214,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pudoc","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":387},{"i":490,"cid":"23CH0082","pid":"P00742354LZ","t":"Construction of Drainage System, Babo Sacan Porac, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION / OMICRON CONSTRUCTION","c":47513188.02,"abc":47519665.79,"fy":"2023","sd":"08/22/2023","cd":"2024-02-17","lat":15.035,"lon":120.3233,"sm":1164,"fm":1164,"tm":null,"am":1326,"md":9.09,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":9.09,"text":"The pin is 9.1 km outside Porac, Pampanga, the nearest municipality the record claims. It falls in San Marcelino, Zambales.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":228},{"i":491,"cid":"24AE0032","pid":"P00839550LZ","t":"Rehabilitation of Drainage System, Barangay Biday, City of San Fernando, La Union","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ARM-ASIA CONSTRUCTION & ENGINEERING","c":9897604.6,"abc":9899620.42,"fy":"2024","sd":"02/14/2024","cd":"2024-06-27","lat":16.62516,"lon":120.324014,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":388},{"i":492,"cid":"24AE0078","pid":"P00845900LZ","t":"Construction of Drainage Canal  in Brgy. Urbiztondo,  San Juan La Union","w":"Construction of Drainage Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":4949472.5,"abc":4949920.57,"fy":"2024","sd":"03/22/2024","cd":"2025-01-24","lat":16.662483,"lon":120.324023,"sm":1310,"fm":1310,"tm":null,"am":1310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Urbiztondo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":389},{"i":493,"cid":"22AF0009","pid":"P00620949LZ","t":"Construction of Flood Control Mitigation Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+540, Brgy. Pugo, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":44792502.5,"abc":45591559.23,"fy":"2022","sd":"02/18/2022","cd":"2022-07-28","lat":16.5203,"lon":120.32464,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pugo","len":540.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":390},{"i":494,"cid":"23AJ0053","pid":"P00726089LZ","t":"Construction of Slope Protection Works along Aponit River, Barangay Abanon, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":19599908.59,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-08-03","lat":15.86478,"lon":120.32468,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Aponit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Abanon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":391},{"i":495,"cid":"24AH0108","pid":"P00825212LZ","t":"Construction of Riverbank Protection along Sinucalan River, Barangay Calmay-Barangay Carael, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48994543.21,"abc":49000000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-09-06","lat":16.045033,"lon":120.325573,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":7.65,"wp":[16.00119,120.38077],"wst":"matched","br":"Calmay-Barangay Carael","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":392},{"i":496,"cid":"23AJ0042","pid":"P00726086LZ","t":"Construction of Slope Protection Works along Cacaritan Creek, Cacaritan Section, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19599224.91,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-11-30","lat":15.9418,"lon":120.3278,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Cacaritan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":393},{"i":497,"cid":"23AJ0036","pid":"P00726083LZ","t":"Construction of Slope Protection Works along San Juan River, Barangay Malaca?ang, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19162877.93,"abc":19600000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-11-10","lat":15.87923,"lon":120.32814,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":2.73,"wp":[15.90208,120.33776],"wst":"matched","br":"Malaca?ang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":394},{"i":498,"cid":"23AH0071","pid":"P00727089LZ","t":"Construction of Riverbank Protection Pantal River, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":48995295.6,"abc":49000000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-07-27","lat":16.04861,"lon":120.3282,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":"Pantal","wn":"Pantal River","wd":0.31,"wp":[16.04582,120.32765],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":395},{"i":499,"cid":"22AH0056","pid":"P00620457LZ","t":"Construction of Riverbank Protection Structure along Barangay Pantal, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":48995746.66,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-01-23","lat":16.045868,"lon":120.328755,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pantal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":396},{"i":500,"cid":"22AH0058","pid":"P00620459LZ","t":"Construction of Riverbank Protection Structure, Barangay Bonuan Binloc, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":23274708.85,"abc":24500000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-14","lat":16.110579,"lon":120.37307,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonuan Binloc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":397},{"i":501,"cid":"23AF0105","pid":"P00727238LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 6)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":72334999.59,"abc":72374999.59,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.39366,"lon":120.373112,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.06,"wp":[16.39345,120.37361],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[863,867,873,886,895,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":383},{"i":502,"cid":"23CJ0066","pid":"P00727152LZ","t":"Construction of Flood Control Structure at Cubcub, Mayantoc, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"MAYANTOC (TARLAC)","deo":"Tarlac District Engineering Office","co":"LAMASIA BUILDERS AND SUPPLY CORP.","c":34300000.0,"abc":34300000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-06-26","lat":15.620031,"lon":120.373247,"sm":960,"fm":960,"tm":960,"am":960,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":398},{"i":503,"cid":"23AJ0056","pid":"P00726092LZ","t":"Construction of Slope Protection Works along Rio De Vega River, Barangay Lilimasan, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19139413.03,"abc":19600000.0,"fy":"2023","sd":"06/02/2023","cd":"2024-01-25","lat":15.937009,"lon":120.373344,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Rio De Vega","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lilimasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":399},{"i":504,"cid":"23AF0106","pid":"P00727239LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 7)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":72334989.79,"abc":72374989.79,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.394973,"lon":120.373896,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.06,"wp":[16.39469,120.37438],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[863,867,873,886,895,501,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":384},{"i":505,"cid":"22AH0134","pid":"P00639432LZ","t":"Construction of Drainage Structure at Brgy. Maasin, Mangaldan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":4897000.0,"abc":4900000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-08-14","lat":16.062522,"lon":120.374131,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":400},{"i":506,"cid":"24A00239","pid":"P00820730LZ","t":"Construction of Slope Protection along Marusay River, Brgy. Quesban, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-31","lat":16.010066,"lon":120.374188,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Marusay","wn":"Marusay River","wd":3.36,"wp":[15.98159,120.36346],"wst":"matched","br":"Quesban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.36,"text":"The title names Marusay, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":374},{"i":507,"cid":"22NF0053","pid":"P00630561MN","t":"Construction of Seawall, Barangay 11, Barangay 12 and Barangay 13, Dapa, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP. / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":95535492.09,"abc":96500000.0,"fy":"2022","sd":"03/06/2022","cd":"2023-03-19","lat":9.756559,"lon":126.047183,"sm":483,"fm":483,"tm":483,"am":483,"md":0.14,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"11","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":401},{"i":508,"cid":"23A00269","pid":"P00726828LZ","t":"Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72373497.78,"abc":72375000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-04-05","lat":16.32736,"lon":120.374995,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":402},{"i":509,"cid":"24AF0047","pid":"P00824833LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Ballay, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / C.T. LEONCIO CONSTRUCTION & TRADING","c":96482209.01,"abc":96499999.03,"fy":"2024","sd":"02/27/2024","cd":"2024-05-20","lat":16.515244,"lon":120.375874,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ballay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":403},{"i":510,"cid":"24A00337","pid":"P00821109LZ","t":"Rehabilitation of Flood Control Structure along Gantay River at Barangay Salincob, Bacnotan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"BACNOTAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":96499911.45,"abc":96500000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-03-14","lat":16.734749,"lon":120.376223,"sm":91,"fm":91,"tm":91,"am":91,"md":0.0,"ls":"inside","ww":"Gantay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salincob","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":404},{"i":511,"cid":"24A00350","pid":"P00820731LZ","t":"Construction of Slope Protection along Rio De Vega, Brgy. Coliling, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":48216034.15,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-05","lat":15.928135,"lon":120.37859,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Coliling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":405},{"i":512,"cid":"24AJ0057","pid":"P00845922LZ","t":"Construction of Drainage, Barangay Cabilocaan to Bued, Calasiao, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":6758718.76,"abc":6930000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-03","lat":16.017,"lon":120.379,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabilocaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":406},{"i":513,"cid":"23CJ0005","pid":"P00726493LZ","t":"Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package A, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-11","lat":15.641397,"lon":120.379261,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.11,"wp":[15.64048,120.37958],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":407},{"i":514,"cid":"23AJ0068","pid":"P00737429LZ","t":"Construction of Drainage at Barangay Cabilocaan, Calasiao, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALPHIN TRADING & CONSTRUCTION","c":4839885.37,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-10-24","lat":16.020187,"lon":120.37958,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabilocaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":408},{"i":515,"cid":"24AC0042","pid":"P00844707LZ","t":"Construction of Flood Control Structure, Barangay Busiing Cen-Sur, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"AB DIAMOND23 CONSTRUCTION","c":14546995.06,"abc":14700000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-09-13","lat":17.60927,"lon":120.380247,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Busiing Cen-Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":409},{"i":516,"cid":"21CA0052","pid":"P00525982LZ","t":"Construction/Rehabilitation of Flood Control Project in Colo River, Roosevelt Section, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"Dinalupihan","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":40961972.01,"abc":48999999.36,"fy":"2021","sd":"07/19/2021","cd":"2022-12-12","lat":14.852302,"lon":120.380399,"sm":512,"fm":null,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.03,"wp":[14.85201,120.38051],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":410},{"i":517,"cid":"21AF0008","pid":"P00561633LZ","t":"Construction of Side Slope Protection River Control, Upstream of Namboongan Bridge (Gabion), Barangay Namboongan, Sto. Tomas, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"Santo Tomas","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":9502019.1,"abc":9899995.88,"fy":"2021","sd":"03/03/2021","cd":"2022-08-01","lat":16.288518,"lon":120.380959,"sm":1415,"fm":null,"tm":1415,"am":1415,"md":0.0,"ls":"inside","ww":"Side Slope Protection","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Namboongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":411},{"i":518,"cid":"24A00165","pid":"P00839553LZ","t":"Rehabilitation of Flood Control Structure, Aringay River Basin, Barangay San Antonio, Aringay, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / KRYPTONITE 6S BUILDERS INC.","c":49499698.64,"abc":49500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-06-15","lat":16.401033,"lon":120.381,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.04,"wp":[16.4007,120.38086],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":412},{"i":519,"cid":"24A00439","pid":"P00824804LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay San Juan West, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":144749933.0,"abc":144750000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-08-10","lat":16.4075,"lon":120.381,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.75,"wp":[16.4008,120.38033],"wst":"matched","br":"San Juan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":413},{"i":520,"cid":"21CA0049","pid":"P00525983LZ","t":"Construction/Rehabilitation of Flood Control Project in Colo River, San Pablo Section, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"Dinalupihan","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48999999.48,"abc":49000000.0,"fy":"2021","sd":"03/26/2021","cd":"2022-11-08","lat":14.851924,"lon":120.38105,"sm":512,"fm":null,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.0,"wp":[14.85193,120.38109],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":414},{"i":521,"cid":"22AC0018","pid":"P00632731LZ","t":"Construction of Drainage Canal along Bayubay Road, San Vicente, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN VICENTE (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":29700000.0,"abc":29700000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-07-17","lat":17.586732,"lon":120.381056,"sm":1361,"fm":1361,"tm":1361,"am":1361,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":415},{"i":522,"cid":"23AH0039","pid":"P00737418LZ","t":"Construction of Drainage System at Barangay Anolid, Mangaldan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":4944500.0,"abc":4950000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-07-19","lat":16.048997,"lon":120.38135,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anolid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":416},{"i":523,"cid":"21AC0002","pid":"P00525871LZ","t":"Construction of Flood Control, along Bantaoay River, Brgy. Busiing Cen-Sur, San Ildefonso, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"San Ildefonso","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2021","sd":"02/24/2022","cd":"2022-07-01","lat":17.609686,"lon":120.381615,"sm":1283,"fm":null,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":"Bantaoay","wn":"Bantaoay River","wd":0.02,"wp":[17.60988,120.38157],"wst":"matched","br":"Busiing Cen-Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":417},{"i":524,"cid":"22AF0001","pid":"P00620953LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Suguidan Sur, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":45075785.1,"abc":46059995.61,"fy":"2022","sd":"02/16/2022","cd":"2022-08-22","lat":16.50986,"lon":120.38242,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Suguidan Sur","len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":418},{"i":525,"cid":"22CA0026","pid":"P00620499LZ","t":"Construction of Flood Control Project along Colo River, Sacrifice Valley Section, Phase ERD-I, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"VM BUILDERS CONSTRUCTION CORPORATION","c":24499999.7,"abc":24499999.88,"fy":"2022","sd":"02/21/2022","cd":"2022-09-26","lat":14.849526,"lon":120.382493,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.0,"wp":[14.84955,120.3825],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":419},{"i":526,"cid":"23AH0042","pid":"P00737420LZ","t":"Construction of Drainage System at Barangay Maasin, Mangaldan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":4944700.0,"abc":4950000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-05-20","lat":16.072086,"lon":120.382599,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":420},{"i":527,"cid":"23CJ0009","pid":"P00726494LZ","t":"Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package B, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-11","lat":15.642069,"lon":120.38276,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.04,"wp":[15.64178,120.38291],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[583,540,590],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CJ0008 to 23CJ0011) cover the same site, together worth PHP 289,282,751.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":195},{"i":528,"cid":"24A00242","pid":"P00821518LZ","t":"Construction of Slope Protection along Marusay River at Barangay Dalongue, Sta. Barbara, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA BARBARA (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48249656.72,"abc":48250000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-09-17","lat":15.99983,"lon":120.382789,"sm":1370,"fm":1370,"tm":1370,"am":1370,"md":0.0,"ls":"inside","ww":"Marusay","wn":"Marusay River","wd":2.89,"wp":[15.98154,120.36354],"wst":"matched","br":"Dalongue","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":421},{"i":529,"cid":"24AC0043","pid":"P00844708LZ","t":"Construction of Flood Control Structure, Barangay Busiing Norte, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":14646516.95,"abc":14700000.0,"fy":"2024","sd":"05/10/2024","cd":"2024-10-19","lat":17.61454,"lon":120.383153,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Busiing Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":422},{"i":530,"cid":"23AC0058","pid":"P00727064LZ","t":"Construction of Flood Control Structure, Barangay Sallacong, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-11-28","lat":17.52558,"lon":120.383292,"sm":157,"fm":157,"tm":157,"am":325,"md":5.56,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sallacong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.75,"value":5.56,"text":"The pin is 5.6 km outside Bantay, Ilocos Sur, the nearest municipality the record claims. It falls in Caoayan, Ilocos Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":284},{"i":531,"cid":"23AC0060","pid":"P00727068LZ","t":"Construction of Drainage Canal along Tamag Road, Barangay Tamag, Vigan City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF VIGAN (CAPITAL) (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"JMCQ CONSTRUCTION AND SUPPLY","c":14682103.54,"abc":14700000.0,"fy":"2023","sd":"06/14/2023","cd":"2024-04-02","lat":17.558203,"lon":120.38336,"sm":438,"fm":438,"tm":438,"am":438,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tamag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":423},{"i":532,"cid":"23AC0054","pid":"P00727067LZ","t":"Construction of Flood Control along Bantaoay River, Barangay Busiing Norte, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION / FIT CONSTRUCTION","c":34257663.3,"abc":34300000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-11-02","lat":17.614732,"lon":120.383828,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":"Bantaoay","wn":"Bantaoay River","wd":0.02,"wp":[17.61488,120.38389],"wst":"matched","br":"Busiing Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":424},{"i":533,"cid":"23CA0027","pid":"P00726923LZ","t":"Construction of Flood Control Structure along Colo River, Sacrifice Valley Section (Phase II-AA), Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":67549999.36,"abc":67549999.36,"fy":"2023","sd":"03/30/2023","cd":"2023-11-22","lat":14.849102,"lon":120.384156,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.04,"wp":[14.84944,120.38415],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":425},{"i":534,"cid":"24AF0125","pid":"P00824826LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 9), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.","c":94560757.31,"abc":94569997.62,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.515925,"lon":120.384517,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 9","dup":[],"run":[536,548,553,578,598,592,593,586,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":301},{"i":535,"cid":"23A00282","pid":"P00726855LZ","t":"Construction of Flood Control along Mestizo River, Barangay Tamag, Vigan City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF VIGAN (CAPITAL) (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION / AB DIAMOND23 CONSTRUCTION","c":96499514.67,"abc":96500000.0,"fy":"2023","sd":"05/02/2023","cd":"2024-02-07","lat":17.557578,"lon":120.384559,"sm":438,"fm":438,"tm":438,"am":438,"md":0.0,"ls":"inside","ww":"Mestizo","wn":"Mestizo River","wd":0.02,"wp":[17.55746,120.38474],"wst":"matched","br":"Tamag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":426},{"i":536,"cid":"24AF0117","pid":"P00824811LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 1), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":94560825.52,"abc":94569997.8,"fy":"2024","sd":"04/18/2024","cd":"2025-01-14","lat":16.513094,"lon":120.384911,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[548,553,578,598,592,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":302},{"i":537,"cid":"22AC0064","pid":"P00637049LZ","t":"Construction of Flood Control Structure along Cabugao River, Brgy. Baclig, Cabugao, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CABUGAO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":44469254.42,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-12-19","lat":17.579272,"lon":120.385857,"sm":280,"fm":280,"tm":280,"am":157,"md":21.61,"ls":"outside","ww":"Cabugao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baclig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":48,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":21.61,"text":"The pin is 21.6 km outside Cabugao, Ilocos Sur, the nearest municipality the record claims. It falls in Bantay, Ilocos Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":206},{"i":538,"cid":"23C00064","pid":"P00726514LZ","t":"Construction of Camiling-Agno River Floodway Phase 6","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":111012635.0,"abc":111012270.4,"fy":"2023","sd":"02/27/2023","cd":"2025-02-10","lat":15.746582,"lon":120.385907,"sm":315,"fm":315,"tm":null,"am":1263,"md":1.21,"ls":"adjacent","ww":"Camiling-Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":427},{"i":539,"cid":"22A00288","pid":"P00639427LZ","t":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 200 - Sta. 000 + 234","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC.","c":4751694.41,"abc":4900000.0,"fy":"2022","sd":"11/03/2022","cd":"2022-11-23","lat":16.328669,"lon":120.386,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":34.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":428},{"i":540,"cid":"23CJ0010","pid":"P00726495LZ","t":"Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package C, Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-11","lat":15.644036,"lon":120.38622,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.06,"wp":[15.64356,120.38647],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[583,527,590],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CJ0008 to 23CJ0011) cover the same site, together worth PHP 289,282,751.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":196},{"i":541,"cid":"24AF0055","pid":"P00824828LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Sto. Cabaritan Sur, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96492160.98,"abc":96499998.82,"fy":"2024","sd":"03/08/2024","cd":"2024-09-23","lat":16.519836,"lon":120.386264,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Cabaritan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":429},{"i":542,"cid":"22AF0002","pid":"P00620951LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Cabaritan Sur, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":45147870.9,"abc":46059971.1,"fy":"2022","sd":"02/16/2022","cd":"2023-11-27","lat":16.52737,"lon":120.3866,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaritan Sur","len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":430},{"i":543,"cid":"23C00063","pid":"P00726513LZ","t":"Construction of Camiling-Agno River Floodway Phase 5","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) / ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":193000000.0,"abc":192997181.6,"fy":"2023","sd":"02/27/2023","cd":"2025-02-10","lat":15.745577,"lon":120.387045,"sm":315,"fm":315,"tm":null,"am":1263,"md":1.05,"ls":"adjacent","ww":"Camiling-Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":431},{"i":544,"cid":"24AE0020","pid":"P00820104LZ","t":"Construction of Flood Control Mitigation Structure along Barangay Guinabang-Barangay Calautit-Maragayap River, Bacnotan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BACNOTAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":82971606.98,"abc":84262345.17,"fy":"2024","sd":"02/14/2024","cd":"2024-07-23","lat":16.753161,"lon":120.387094,"sm":91,"fm":91,"tm":91,"am":91,"md":0.0,"ls":"inside","ww":"Barangay Guinabang-Barangay Calautit-Maragayap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guinabang-Barangay Calautit-Maragayap River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":432},{"i":545,"cid":"23AJ0022","pid":"P00726075LZ","t":"Construction of Slope Protection Works along Ingalera River, barangay Ano, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19350566.85,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-04-18","lat":15.96041,"lon":120.3871,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":3.68,"wp":[15.93892,120.41332],"wst":"matched","br":"Ano","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":433},{"i":546,"cid":"24AF0014","pid":"P00821478LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Barangay Cabaritan Sur, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48740182.59,"abc":48999992.02,"fy":"2024","sd":"02/06/2024","cd":"2024-05-20","lat":16.523672,"lon":120.387386,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaritan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":434},{"i":547,"cid":"22AH0067","pid":"P00631083LZ","t":"Construction of Drainage System along Pangasinan- La Union National Highway (Mangaldan Section) from Barangays Poblacion, Anolid, Malabago and Bari in Mangaldan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / MIGHTYWAY CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-21","lat":16.053901,"lon":120.387422,"sm":916,"fm":916,"tm":null,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":435},{"i":548,"cid":"24AF0118","pid":"P00824814LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 2), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":94560126.68,"abc":94569998.83,"fy":"2024","sd":"04/18/2024","cd":"2025-01-14","lat":16.519233,"lon":120.387553,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[536,553,578,598,592,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":303},{"i":549,"cid":"23AF0099","pid":"P00727248LZ","t":"Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 4)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":72334831.82,"abc":72374999.94,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.330339,"lon":120.387967,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":436},{"i":550,"cid":"22AF0012","pid":"P00620952LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Natividad, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":45020399.68,"abc":46059998.62,"fy":"2022","sd":"02/16/2022","cd":"2022-08-15","lat":16.52782,"lon":120.38848,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Natividad","len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":437},{"i":551,"cid":"22A00289","pid":"P00639428LZ","t":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 650 - Sta. 000 + 710","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC.","c":7885653.01,"abc":8134000.0,"fy":"2022","sd":"11/03/2022","cd":"2022-12-02","lat":16.323738,"lon":120.388778,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":438},{"i":552,"cid":"23AJ0021","pid":"P00726063LZ","t":"Construction of Slope Protection Works along Ingalera River, Macabito, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":48999652.24,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-11","lat":15.954606,"lon":120.38883,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":3.15,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":439},{"i":553,"cid":"24AF0119","pid":"P00824816LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 3), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":94560926.77,"abc":94569998.71,"fy":"2024","sd":"04/18/2024","cd":"2025-01-16","lat":16.521669,"lon":120.388942,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[536,548,578,598,592,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":304},{"i":554,"cid":"24AF0056","pid":"P00824827LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Natividad, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96492336.54,"abc":96499997.99,"fy":"2024","sd":"03/08/2024","cd":"2024-12-23","lat":16.5239,"lon":120.389078,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Natividad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":440},{"i":555,"cid":"22A00284","pid":"P00639429LZ","t":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 810 - Sta. 000 + 900, Sta. 000 + 915- Sta. 000 + 940, Sta. 001 + 190 - Sta. 001 + 220, Sta. 001 + 740 - Sta. 001 + 764","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"BHM CONSTRUCTION","c":34228109.95,"abc":35280000.0,"fy":"2022","sd":"11/03/2022","cd":"2022-12-17","lat":16.322475,"lon":120.38924,"sm":10,"fm":10,"tm":null,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":169.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":441},{"i":556,"cid":"23AC0057","pid":"P00727063LZ","t":"Construction of Flood Control Structure along Bantaoay River, Barangay Dongalo, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-08-25","lat":17.620161,"lon":120.389969,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":"Bantaoay","wn":"Bantaoay River","wd":0.02,"wp":[17.61996,120.39002],"wst":"matched","br":"Dongalo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":442},{"i":557,"cid":"23C00013","pid":"P00725700LZ","t":"Construction of Flood Control Structure along Bagac River (Valdez Bridge), Bagac, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"BAGAC (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE) / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":96500000.0,"abc":96499351.93,"fy":"2023","sd":"04/03/2023","cd":"2024-05-21","lat":14.593071,"lon":120.390063,"sm":105,"fm":105,"tm":105,"am":105,"md":0.0,"ls":"inside","ww":"Bagac","wn":"Bagac River","wd":0.15,"wp":[14.59173,120.39042],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":443},{"i":558,"cid":"21AC0167","pid":"P00561626LZ","t":"Construction of River Control/Dredging of Amianance-Capangpangan Creek, Vigan City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"City of Vigan","deo":"Ilocos Sur 1st District Engineering Office","co":"R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":19800000.0,"abc":19800000.0,"fy":"2021","sd":"06/02/2022","cd":"2022-12-28","lat":17.575192,"lon":120.390736,"sm":438,"fm":null,"tm":438,"am":438,"md":0.0,"ls":"inside","ww":"Amianance-Capangpangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":444},{"i":559,"cid":"23CJ0059","pid":"P00726741LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Right Bank, Telbang - Baybayaoas Section (Package B), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48141152.82,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-05-25","lat":15.642072,"lon":120.390767,"sm":315,"fm":315,"tm":315,"am":960,"md":0.35,"ls":"boundary","ww":"Camiling","wn":"Camiling River","wd":0.36,"wp":[15.64494,120.38924],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":445},{"i":560,"cid":"23AF0073","pid":"P00742275LZ","t":"Construction of Flood Control System at San Simon East, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"KRYPTONITE 6S BUILDERS INC.","c":19305948.62,"abc":19599956.48,"fy":"2023","sd":"03/15/2023","cd":"2023-11-20","lat":16.386223,"lon":120.391045,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":446},{"i":561,"cid":"21AC0166","pid":"P00561624LZ","t":"Construction of Flood Control along Meztizo River, Barangay Capangpangan, Vigan City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"City of Vigan","deo":"Ilocos Sur 1st District Engineering Office","co":"VIGAN FORTUNE CONSTRUCTION","c":19800000.0,"abc":19800000.0,"fy":"2021","sd":"06/02/2022","cd":"2022-09-20","lat":17.573533,"lon":120.391169,"sm":438,"fm":null,"tm":438,"am":438,"md":0.0,"ls":"inside","ww":"Meztizo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Capangpangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":447},{"i":562,"cid":"22AC0052","pid":"P00640493LZ","t":"Construcion of Flood Control in Brgy. Gongogong, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-07-17","lat":17.619706,"lon":120.391235,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gongogong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":448},{"i":563,"cid":"23AF0098","pid":"P00727247LZ","t":"Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":72334831.82,"abc":72374967.69,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.33116,"lon":120.391471,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":449},{"i":564,"cid":"24AF0104","pid":"P00843192LZ","t":"Construction of Flood Control Structure, Phase 1, Barangay San Jose, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48244610.83,"abc":48249999.77,"fy":"2024","sd":"04/03/2024","cd":"2025-02-16","lat":16.425019,"lon":120.391698,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":450},{"i":565,"cid":"24A00246","pid":"P00821519LZ","t":"Construction of Slope Protection along Sinucalan River at Barangay Tuliao, Sta. Barbara, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA BARBARA (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":46855124.83,"abc":48250000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-30","lat":16.008142,"lon":120.391813,"sm":1370,"fm":1370,"tm":1370,"am":1370,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":0.01,"wp":[16.00806,120.39179],"wst":"matched","br":"Tuliao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":451},{"i":566,"cid":"23CJ0056","pid":"P00726496LZ","t":"Construction of Camiling River Right Bank, Baybayaoas - Telbang Section (Package P), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"MAYANTOC (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-11","lat":15.645761,"lon":120.392236,"sm":960,"fm":960,"tm":432,"am":960,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.11,"wp":[15.64654,120.39167],"wst":"matched","br":null,"len":null,"ph":"Package P","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.03,"text":"The record contradicts itself: the municipality field and the pin point to Mayantoc, Tarlac, but the title names City of Tarlac, Tarlac, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":420},{"i":567,"cid":"23AH0043","pid":"P00737421LZ","t":"Construction of Slope Protection at Barangay Bantayan, Mangaldan, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ZOTA TRADING & CONSTRUCTION","c":4948194.59,"abc":4950000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-04-26","lat":16.089896,"lon":120.39235,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bantayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":452},{"i":568,"cid":"23AF0072","pid":"P00742277LZ","t":"Construction of Flood Control, San Juan East, Sitio Las Ud, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48019871.4,"abc":48999969.61,"fy":"2023","sd":"03/15/2023","cd":"2024-02-11","lat":16.411313,"lon":120.393087,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":453},{"i":569,"cid":"22A00290","pid":"P00639430LZ","t":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Sta. 000 + 380 - Sta. 000 + 482, Agoo, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC.","c":12737486.24,"abc":13132000.0,"fy":"2022","sd":"11/03/2022","cd":"2022-12-02","lat":16.313026,"lon":120.393173,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":102.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":29,"text":"A PHP 12,737,486 contract recorded as completed 29 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":797},{"i":570,"cid":"24AF0161","pid":"P00821473LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay San Juan East, Aringay, La Union (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP. / RPV RED MOUNTAIN KONSTRUCT, INC.","c":28943409.41,"abc":28949995.54,"fy":"2024","sd":"08/13/2024","cd":"2025-01-17","lat":16.41707,"lon":120.393754,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":2.06,"wp":[16.39986,120.40113],"wst":"matched","br":"San Juan East","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":454},{"i":571,"cid":"22CJ0190","pid":"P00640526LZ","t":"Construction of Slope Protection along Camiling River (Left Bank), Anoling 2nd - Pao 3rd Section (Package D), Camiling, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / RCUBE ENGINEERING SERVICES","c":49500000.0,"abc":49500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-26","lat":15.648001,"lon":120.394358,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.05,"wp":[15.64755,120.39451],"wst":"matched","br":null,"len":null,"ph":"Package D","dup":[],"run":[199,136,141,164,158,137,140],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (22CJ0186 to 22CJ0194) cover the same site, together worth PHP 668,860,939.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":466},{"i":572,"cid":"24AF0043","pid":"P00844722LZ","t":"Construction of Flood Control Structure, Barangay San Fermin, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48995000.0,"abc":48999998.7,"fy":"2024","sd":"02/16/2024","cd":"2025-03-16","lat":16.452385,"lon":120.394532,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Fermin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":455},{"i":573,"cid":"22AF0013","pid":"P00631075LZ","t":"Construction of Flood Control Structure Along Bauang River Basin, Brgy. Baraoas Norte, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":9548636.66,"abc":9799998.73,"fy":"2022","sd":"02/22/2022","cd":"2022-07-25","lat":16.54502,"lon":120.39488,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baraoas Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":456},{"i":574,"cid":"24A00279","pid":"P00824808LZ","t":"Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":154399985.9,"abc":154400000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-04-15","lat":16.663164,"lon":120.395046,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.0,"wp":[16.66314,120.39502],"wst":"matched","br":"Nagsabaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":457},{"i":575,"cid":"23AE0036","pid":"P00742272LZ","t":"Rehabilitation of Flood Mitigation Structure (Phase 1) along Dayacos River, Barangay Bacsayan, San Juan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S","c":5839670.96,"abc":5939999.14,"fy":"2023","sd":"04/28/2023","cd":"2023-07-17","lat":16.681217,"lon":120.39506,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Dayacos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bacsayan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":458},{"i":576,"cid":"23C00202","pid":"P00725714LZ","t":"Construction of Flood Control Project along Colo Rive, Pinulot Section, Phase II- 1A, Dinalupihan, Baaan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 3rd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":47574500.0,"abc":47574499.86,"fy":"2023","sd":"07/09/2023","cd":"2024-02-28","lat":14.847772,"lon":120.395114,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":459},{"i":577,"cid":"23AH0041","pid":"P00737419LZ","t":"Construction of Drainage System at Barangay Cayanga, San Fabian, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN FABIAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":4941245.0,"abc":4950000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-05-20","lat":16.114309,"lon":120.395222,"sm":1269,"fm":1269,"tm":1269,"am":1269,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cayanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":460},{"i":578,"cid":"24AF0120","pid":"P00824818LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 4), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":94560128.59,"abc":94569996.92,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.522447,"lon":120.395303,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[536,548,553,598,592,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":305},{"i":579,"cid":"23AC0005","pid":"P00726050LZ","t":"Construction of Flood Control, Barangay Bahet, San Ildefonso, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN ILDEFONSO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SATRAP CONSTRUCTION CO., INC.","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-06-17","lat":17.609697,"lon":120.395392,"sm":1283,"fm":1283,"tm":1283,"am":1283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bahet","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":461},{"i":580,"cid":"23CJ0070","pid":"P00726497LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation Along Camiling River Right Bank, Baybayaoas - Telbang Section (Package Q), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"MAYANTOC (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-13","lat":15.647097,"lon":120.395583,"sm":960,"fm":960,"tm":432,"am":960,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Camiling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package Q","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.86,"text":"The record contradicts itself: the municipality field and the pin point to Mayantoc, Tarlac, but the title names City of Tarlac, Tarlac, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":421},{"i":581,"cid":"23AE0037","pid":"P00727085LZ","t":"Rehabilitation of Flood Mitigation Structure along Dayacos River, Barangay Bacsayan, San Juan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S","c":3030571.58,"abc":3108542.23,"fy":"2023","sd":"03/10/2023","cd":"2023-05-19","lat":16.681423,"lon":120.39593,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Dayacos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bacsayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":462},{"i":582,"cid":"24AF0016","pid":"P00821477LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Barangay Bato, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48717833.77,"abc":48999999.48,"fy":"2024","sd":"02/06/2024","cd":"2024-05-20","lat":16.522692,"lon":120.396953,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":463},{"i":583,"cid":"23CJ0008","pid":"P00726194LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package A), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48141770.99,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-06-15","lat":15.64929,"lon":120.39773,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.04,"wp":[15.64902,120.39791],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[527,540,590],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CJ0008 to 23CJ0011) cover the same site, together worth PHP 289,282,751.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":537},{"i":584,"cid":"22A00275","pid":"P00639317LZ","t":"Construction of Slope Protection Works along Naguilian - Caba Road, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"J.H. PAJARA CONSTRUCTION CORPORATION / S-ANG CONSTRUCTION & GENERAL TRADING, INC.","c":241249956.0,"abc":241250000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-01-10","lat":16.42834,"lon":120.39785,"sm":270,"fm":270,"tm":null,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":464},{"i":585,"cid":"21CA0041","pid":"P00525593LZ","t":"Construction/Rehabilitation of Flood Control Project in Colo River, Mabiga Section, Phase B, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"Hermosa","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":91661488.37,"abc":91661488.37,"fy":"2021","sd":"03/31/2022","cd":"2022-12-26","lat":14.846797,"lon":120.39833,"sm":615,"fm":null,"tm":615,"am":512,"md":0.01,"ls":"boundary","ww":"Colo","wn":"Colo River","wd":0.03,"wp":[14.84664,120.39812],"wst":"matched","br":null,"len":null,"ph":"Phase B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":465},{"i":586,"cid":"24AF0124","pid":"P00824825LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 8), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.","c":94561818.5,"abc":94569992.94,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.513583,"lon":120.398528,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 8","dup":[],"run":[536,548,553,578,598,592,593,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":306},{"i":587,"cid":"21AC0164","pid":"P00525867LZ","t":"Construction of Flood Control along Cabaroan Creek, Brgy. Cabaroan, Bantay, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"Bantay","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":14679126.24,"abc":14700000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-06","lat":17.581278,"lon":120.398583,"sm":157,"fm":null,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":"Cabaroan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaroan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":466},{"i":588,"cid":"22AC0008","pid":"P00620937LZ","t":"Construction of Flood Control Structure along Cabaroan Creek, Barangay Cabaroan, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BANTAY (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-06","lat":17.581134,"lon":120.398607,"sm":157,"fm":157,"tm":157,"am":157,"md":0.0,"ls":"inside","ww":"Cabaroan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaroan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":467},{"i":589,"cid":"24A00240","pid":"P00838506LZ","t":"Construction of Flood Control Structure, Barangay Antonino, Balaoan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BALAOAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"JMBM CONSTRUCTION","c":19298382.61,"abc":19300000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-05-31","lat":16.821247,"lon":120.398971,"sm":121,"fm":121,"tm":121,"am":121,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Antonino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":468},{"i":590,"cid":"23CJ0011","pid":"P00726740LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package B), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48140980.09,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-06-15","lat":15.650203,"lon":120.39918,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.02,"wp":[15.65008,120.39937],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[583,527,540],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CJ0008 to 23CJ0011) cover the same site, together worth PHP 289,282,751.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":538},{"i":591,"cid":"24AF0041","pid":"P00844723LZ","t":"Construction of Flood Control Structure, Phase 2, Barangay San Jose, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48995000.01,"abc":48999999.0,"fy":"2024","sd":"02/16/2024","cd":"2025-02-16","lat":16.429186,"lon":120.399228,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":469},{"i":592,"cid":"24AF0122","pid":"P00824822LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 6), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":94562171.36,"abc":94569999.19,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.513422,"lon":120.399253,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 6","dup":[],"run":[536,548,553,578,598,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":307},{"i":593,"cid":"24AF0123","pid":"P00824824LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 7), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.","c":94560506.31,"abc":94569998.62,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.5179,"lon":120.399539,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 7","dup":[],"run":[536,548,553,578,598,592,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":308},{"i":594,"cid":"22AF0014","pid":"P00631071LZ","t":"Construction of Flood Control and Drainage Structure at Brgys. Cupang And Casilagan, Sto. Tomas, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SANTO TOMAS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":44100000.0,"abc":44099999.49,"fy":"2022","sd":"02/24/2022","cd":"2023-09-11","lat":16.26403,"lon":120.39983,"sm":1415,"fm":1415,"tm":1415,"am":1415,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":470},{"i":595,"cid":"23A00114","pid":"P00726338LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay San Antonio, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":115799339.3,"abc":115800000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-06-05","lat":16.399411,"lon":120.399921,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.08,"wp":[16.39901,120.4005],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":471},{"i":596,"cid":"22CB0040","pid":"P00620508LZ","t":"Construction of Flood Control Structure along Paysawan River, Bagac, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"BAGAC (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"VF CONSTRUCTION / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-12","lat":14.532145,"lon":120.400054,"sm":105,"fm":105,"tm":105,"am":105,"md":0.0,"ls":"inside","ww":"Paysawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":472},{"i":597,"cid":"23CJ0139","pid":"P00742372LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation and Road Component along Camiling River Left Bank, Anoling 3rd to Pao 1st Section , Camiling, Tarlac (Package F)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48040048.18,"abc":49500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-09-13","lat":15.651675,"lon":120.4002,"sm":315,"fm":315,"tm":315,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.02,"wp":[15.65156,120.40038],"wst":"matched","br":null,"len":null,"ph":"Package F","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":473},{"i":598,"cid":"24AF0121","pid":"P00824820LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 5), Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":94561136.19,"abc":94569998.62,"fy":"2024","sd":"04/18/2024","cd":"2025-03-16","lat":16.518408,"lon":120.400236,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[536,548,553,578,592,593,586,534,306],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (24AF0117 to 24AF0126) cover the same site, together worth PHP 933,451,627.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":309},{"i":599,"cid":"24CJ0097","pid":"P00821279LZ","t":"Construction of Slope Protection along Camiling River, Left Bank, Anoling 1st to Pao 2nd Section (Segment D), Camiling River","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":41151460.0,"abc":41791120.0,"fy":"2024","sd":"03/11/2024","cd":"2024-05-20","lat":15.645772,"lon":120.400406,"sm":315,"fm":315,"tm":null,"am":315,"md":0.0,"ls":"inside","ww":"Camiling","wn":"Camiling River","wd":0.45,"wp":[15.6492,120.39822],"wst":"matched","br":null,"len":null,"ph":"Segment D","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":474},{"i":600,"cid":"24AF0042","pid":"P00844721LZ","t":"Construction of Flood Control Structure, Barangay Liquicia, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48995000.01,"abc":48999994.05,"fy":"2024","sd":"02/16/2024","cd":"2025-03-16","lat":16.42906,"lon":120.400588,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Liquicia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":475},{"i":601,"cid":"23NF0041","pid":"P00734381MN","t":"Construction of Seawall, Dapa, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / KENT MARKETING GROUP OF COMPANIES INC.","c":98949816.86,"abc":99000000.0,"fy":"2023","sd":"07/13/2023","cd":"2024-05-21","lat":9.76376,"lon":126.04089,"sm":483,"fm":483,"tm":483,"am":483,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":476},{"i":602,"cid":"21KG0086","pid":"P00522069MN","t":"Construction of Flood Control Structures, Tagoloan, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"Tagoloan","deo":"Lanao del Norte 2nd District Engineering Office","co":"AL HUSSEIN CONSTRUCTION","c":96333246.89,"abc":96489569.26,"fy":"2021","sd":"11/26/2021 ","cd":"2022-12-15","lat":8.1092,"lon":124.312933,"sm":1517,"fm":null,"tm":1517,"am":1096,"md":0.27,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":477},{"i":603,"cid":"21H00030","pid":"P00521556VS","t":"Construction of Flood Control Structures (Shore Protection), Phase I at Lazi, Siquijor","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"SIQUIJOR","mu":"Siquijor","deo":"Siquijor District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96499989.16,"abc":96500000.0,"fy":"2021","sd":"03/02/2021","cd":"2022-09-19","lat":9.152138,"lon":123.514168,"sm":1465,"fm":null,"tm":1465,"am":1312,"md":2.42,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":478},{"i":604,"cid":"21H00029","pid":"P00521555VS","t":"Construction of Flood Control Structures (Shore Protection), Phase 2 at Lazi, Siquijor","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"SIQUIJOR","mu":"Siquijor","deo":"Siquijor District Engineering Office","co":"JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S)","c":86662736.91,"abc":86662790.0,"fy":"2021","sd":"03/01/2021","cd":"2022-08-18","lat":9.152149,"lon":123.514355,"sm":1465,"fm":null,"tm":1465,"am":1312,"md":2.41,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":479},{"i":605,"cid":"21E00016","pid":"P00525653LZ","t":"Construction of Flood Mitigation Structure (Seawall), Calategas, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"Narra","deo":"Palawan 2nd District Engineering Office","co":"PTK GROUP INC. / ST. TIMOTHY CONSTRUCTION CORPORATION","c":120624562.1,"abc":120624012.4,"fy":"2021","sd":"02/18/2021","cd":"2022-12-31","lat":9.168739,"lon":118.214742,"sm":1011,"fm":null,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":480},{"i":606,"cid":"21HL0045","pid":"P00521660VS","t":"Construction of Pagatban River Contriol, Upstream A, Pagatban, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":null,"deo":"Negros Oriental 3rd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"02/22/2021","cd":"2023-01-24","lat":9.39045,"lon":122.71375,"sm":null,"fm":null,"tm":null,"am":172,"md":null,"ls":"unknown","ww":"Pagatban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":9},{"i":607,"cid":"21HG0144","pid":"P00521644VS","t":"Construction of Dalaguete River Flood Control, Dalaguete, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Dalaguete","deo":"Cebu 2nd District Engineering Office","co":"O.Q. CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"10/13/2021","cd":"2022-07-03","lat":9.761697,"lon":123.527694,"sm":476,"fm":null,"tm":476,"am":476,"md":0.0,"ls":"inside","ww":"Dalaguete","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":481},{"i":608,"cid":"21HO0002","pid":"P00521651VS","t":"Construction of Tapon-Tangil Seawall, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Dumanjug","deo":"Cebu 2nd District Engineering Office","co":"QM BUILDERS","c":29398308.79,"abc":29398308.79,"fy":"2021","sd":"03/23/2022","cd":"2022-10-08","lat":10.068967,"lon":123.445111,"sm":539,"fm":null,"tm":539,"am":539,"md":0.15,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":482},{"i":609,"cid":"21HH0148","pid":"P00521535VS","t":"Construction of Flood Mitigation Structure with Desilting along Bulacao River, Brgy. Inayawan and Brgy. Bulacao, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu City District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION / LA PRUEBA CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-28","lat":10.265231,"lon":123.863533,"sm":362,"fm":null,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Bulacao","wn":"Bulacao River","wd":0.12,"wp":[10.2642,123.86331],"wst":"matched","br":"Inayawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":483},{"i":610,"cid":"21HH0118","pid":"P00521536VS","t":"Construciton of Flood Mitigation Structure with Desilting along Tagunol Creek, Brgy. Basak San Nicolas and Brgy. Basak Pardo, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu City District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":91209687.18,"abc":96500000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-29","lat":10.279575,"lon":123.869797,"sm":362,"fm":null,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Tagunol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Basak San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":484},{"i":611,"cid":"21HN0069","pid":"P00521549VS","t":"Construction of Flood Control/Drainage, Barangay Marigondon, Basak and Babag, Lapu-lapu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Lapu-Lapu City","deo":"Cebu 6th District Engineering Office","co":"EDANNA CONSTRUCTION / GOLDFIN CONSTRUCTION & DEVELOPMENT CORPORATION (FORMERLY: GOLDFIN CONSTRUCTION)","c":60833104.17,"abc":62725000.0,"fy":"2021","sd":"03/31/2022","cd":"2023-07-31","lat":10.28062,"lon":123.955249,"sm":754,"fm":null,"tm":754,"am":754,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marigondon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":485},{"i":612,"cid":"21HH0144","pid":"P00521558VS","t":"Construction of Flood Mitigation Structure at Brgy. Mambaling and Brgy. San Nicolas, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu City District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-28","lat":10.286333,"lon":123.887167,"sm":362,"fm":null,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambaling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":486},{"i":613,"cid":"21HH0119","pid":"P00521532VS","t":"Construction of Flood Mitigation Structure with Desilting along Lahug River, Brgy. T. Padilla and Brgy. Day-as, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu City District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":82806662.53,"abc":96500000.0,"fy":"2021","sd":"10/29/2021","cd":"2022-08-27","lat":10.304177,"lon":123.906338,"sm":362,"fm":null,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Lahug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"T. Padilla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":487},{"i":614,"cid":"21HH0120","pid":"P00521533VS","t":"Construction of Flood Mitigation Structure with Desilting along Lahug River, Brgy. Zapatera and Brgy. Kamputhaw, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu City District Engineering Office","co":"JM COLLERA KONSTRACT / C.T. LEONCIO CONSTRUCTION & TRADING","c":96499521.74,"abc":96500000.0,"fy":"2021","sd":"10/29/2021","cd":"2022-08-27","lat":10.311198,"lon":123.903332,"sm":362,"fm":null,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Lahug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zapatera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":488},{"i":615,"cid":"21HI0009","pid":"P00521554VS","t":"Construction of Flood Control Structure along Danao Bridge I, Danao City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Danao City","deo":"Cebu 5th District Engineering Office","co":"BNR CONSTRUCTION & DEVELOPMENT CORP. / VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":94895726.98,"abc":96267435.0,"fy":"2021","sd":"03/08/2021","cd":"2022-08-02","lat":10.528335,"lon":124.024476,"sm":479,"fm":null,"tm":479,"am":479,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":489},{"i":616,"cid":"18G00082","pid":"P00221318VS","t":"Construction of Drainage System within the vicinity of City Proper Area ( Gen. Luna-Jalandoni-Rizal-J.M. Basa), including Lapaz and Mandurriao, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"MGB CONSTRUCTION & TRADING","c":183182224.3,"abc":183350000.0,"fy":"2018","sd":"09/06/2018","cd":"2023-05-10","lat":10.707,"lon":122.569,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":490},{"i":617,"cid":"21HD0054","pid":"P00521564VS","t":"Rehabilitation of Flood Control along Balidbid River, Santa Fe, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"Santa Fe","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION / ROVILLA CONSTRUCTION","c":88550330.0,"abc":88550330.0,"fy":"2021","sd":"12/31/2021","cd":"2022-09-05","lat":11.18019,"lon":123.78173,"sm":1383,"fm":null,"tm":1383,"am":1383,"md":0.0,"ls":"inside","ww":"Balidbid","wn":"Balidbid River","wd":0.2,"wp":[11.1815,123.78299],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":491},{"i":618,"cid":"21E00076","pid":"P00561578LZ","t":"Construction of Cabulutan Flood Control, Cabulutan, San Agustin,Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"San Agustin","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48235589.63,"abc":135098806.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-22","lat":12.283,"lon":122.0,"sm":1252,"fm":null,"tm":1252,"am":806,"md":20.02,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":20.02,"text":"The pin is 20.0 km outside San Agustin, Romblon, the nearest municipality the record claims. It falls in Looc, Romblon.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"coarse_pin","group":"location","strength":0.4,"value":0,"text":"Coordinates are recorded with only 0 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":101},{"i":619,"cid":"21E00079","pid":"P00561447LZ","t":"Construction of Tuburan Flood Control, Tuburan, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"Odiongan","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / FFJJ CONSTRUCTION","c":86765881.53,"abc":173698678.8,"fy":"2021","sd":"03/24/2022","cd":"2022-12-20","lat":12.351,"lon":122.026,"sm":1034,"fm":null,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":492},{"i":620,"cid":"21E00079","pid":"P00561448LZ","t":"Construction of Tuguis Flood Control along Looc (Cogon-Tulay) Odiongan Road, Brgy Progreso Este, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"Odiongan","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / FFJJ CONSTRUCTION","c":86802582.54,"abc":173698678.8,"fy":"2021","sd":"03/24/2022","cd":"2022-12-20","lat":12.452,"lon":122.026,"sm":1034,"fm":null,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Progreso Este","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":493},{"i":621,"cid":"21E00050","pid":"P00525656LZ","t":"Construction/Rehabilitation of San Andres Putik (Mag-asawang Tubig), Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Naujan","deo":"Mindoro Oriental District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":48249999.78,"abc":48249214.78,"fy":"2021","sd":"03/30/2021","cd":"2022-07-29","lat":13.134925,"lon":121.166378,"sm":1017,"fm":null,"tm":1017,"am":1629,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":494},{"i":622,"cid":"21BC0210","pid":"P00538188LZ","t":"Restoration of Sicalao Flood Control, Sicalao, Lasam, Cagayan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"Lasam","deo":"Cagayan 2nd District Engineering Office","co":"NC RODRIGUEZ CONSTRUCTION","c":21287900.0,"abc":21287900.0,"fy":"2021","sd":"10/29/2021","cd":"2022-09-30","lat":18.043611,"lon":121.480833,"sm":759,"fm":null,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":495},{"i":623,"cid":"21FA0059","pid":"P00538311LZ","t":"Reconstruction/ Rehabilitation/ Improvement of Bogñabong River Control at Brgy. Bogñabong, Tabaco City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"City of Tabaco","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":3874835.79,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.340833,"lon":123.712207,"sm":423,"fm":null,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Bogñabong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bogñabong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":496},{"i":624,"cid":"21FA0059","pid":"P00538312LZ","t":"Rehabilitation/ Improvement of Salvacion Fatima River Control, Tabaco City, Albay Sta. 0+000.00 - Sta. 0+020.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"City of Tabaco","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":2399955.0,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.348055,"lon":123.735555,"sm":423,"fm":null,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Salvacion Fatima","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":20.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":497},{"i":625,"cid":"21FA0059","pid":"P00538313LZ","t":"Repair/ Rehabilitation of Flood Control at Purok 4, San Jose, Malilipot, Albay Sta. 0+000.00 - Sta. 0+176.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"Malilipot","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":5003525.0,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.29817,"lon":123.753948,"sm":895,"fm":null,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":176.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":498},{"i":626,"cid":"21FA0059","pid":"P00538314LZ","t":"Reconstruction/ Rehabilitation of Slope Protection at Labnig, Malinao, Albay","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"Malinao","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":6697100.0,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.379368,"lon":123.674638,"sm":897,"fm":null,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":499},{"i":627,"cid":"21FA0059","pid":"P00538315LZ","t":"Reconstruction/ Rehabilitation of Slope Protection at Pawa, Malinao, Albay","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"Malinao","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":6899750.0,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.383697,"lon":123.701777,"sm":897,"fm":null,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":500},{"i":628,"cid":"21FA0059","pid":"P00538316LZ","t":"Rehabilitation of Awang River Control (Upstream), Malinao, Albay, Site 2","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"Malinao","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":7956425.0,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.375833,"lon":123.689682,"sm":897,"fm":null,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Awang","wn":"Nawang","wd":8.46,"wp":[13.32044,123.7436],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":501},{"i":629,"cid":"21FA0059","pid":"P00538317LZ","t":"Repair/ Rehabilitation of Flood Control at Purok 4, Bangkilingan, Tabaco City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"City of Tabaco","deo":"Albay 1st District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":4861781.05,"abc":37693122.07,"fy":"2021","sd":"03/21/2022","cd":"2022-07-27","lat":13.340833,"lon":123.712222,"sm":423,"fm":null,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":502},{"i":630,"cid":"22GM0067","pid":"P00538308VS","t":"Repair/ Rehabilitation/ Reconstruction of Flood Mitigation Structure damaged by Typhoon Odette along Hilabangan River, Kabankalan City, Negros Occidental","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"City of Kabankalan","deo":"Negros Occidental 3rd District Engineering Office","co":"ST. RAYMUND CONSTRUCTION, INC.","c":5904535.77,"abc":5928072.01,"fy":"2021","sd":"04/13/2022","cd":"2022-07-14","lat":9.955,"lon":122.83222,"sm":391,"fm":null,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Hilabangan","wn":"Hilabangan River","wd":0.05,"wp":[9.95541,122.83222],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":503},{"i":631,"cid":"22EF0064","pid":"P00620662LZ","t":"Construction of Poblacion Balabac Seawall, Sta. 0+000 - Sta. 0+100, Balabac, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BALABAC (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION)","c":9328616.52,"abc":9321620.0,"fy":"2022","sd":"03/25/2022","cd":"2022-12-02","lat":7.987855,"lon":117.061736,"sm":115,"fm":115,"tm":115,"am":115,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":504},{"i":632,"cid":"23EF0024","pid":"P00726273LZ","t":"Construction of Box Culvert in Sitios Sarimog and Pulangi, Latud, Rizal, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"RDF TRADING AND CONSTRUCTION","c":9652747.12,"abc":9800000.0,"fy":"2023","sd":"02/15/2023","cd":"2024-10-07","lat":8.658,"lon":117.309,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":505},{"i":633,"cid":"24EF0012","pid":"P00820392LZ","t":"Construction of Colby River Flood Control Structure, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ZAMBOANGA DEL NORTE","mu":"RIZAL (ZAMBOANGA DEL NORTE)","deo":"Palawan 2nd District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":53072829.34,"abc":53075000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-11-15","lat":8.724422,"lon":117.373389,"sm":1211,"fm":1208,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Colby","wn":"Colby River","wd":0.01,"wp":[8.72434,117.37336],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":676.51,"text":"The record contradicts itself: the title and the pin point to Rizal, Palawan, but the municipality field names Rizal, Zamboanga del Norte, 677 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":515},{"i":634,"cid":"23EF0061","pid":"P00726268LZ","t":"Construction of Colby River Flood Control Structure, Sta. 0 + 620 - Sta. 0 + 820 R/S Upstream, Barangay Taburi, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"SAMURAI CONSTRUCTION","c":19599689.79,"abc":19600000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-12-15","lat":8.72472,"lon":117.37528,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Colby","wn":"Colby River","wd":0.01,"wp":[8.7248,117.37523],"wst":"matched","br":"Taburi","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":506},{"i":635,"cid":"23E00081","pid":"P00736053LZ","t":"Construction of River Bank Protection Works along Culandanum River, Bataraza, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"BATARAZA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / RDF TRADING AND CONSTRUCTION","c":192997113.1,"abc":192999999.9,"fy":"2023","sd":"03/11/2023","cd":"2024-08-20","lat":8.6575,"lon":117.45111,"sm":181,"fm":181,"tm":181,"am":181,"md":0.0,"ls":"inside","ww":"Culandanum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":507},{"i":636,"cid":"23EF0012","pid":"P00726770LZ","t":"Construction of Culasian Flood Control Structure, Sta. 0 + 082 - Sta. 0 + 162 R/S Downstream, Barangay Culasian, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"F A M E CONSTRUCTION TRADING","c":9701996.2,"abc":9800000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-28","lat":8.83593,"lon":117.49307,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culasian","len":80.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":508},{"i":637,"cid":"22EF0069","pid":"P00621114LZ","t":"Construction of Culasian River Flood Control Structure, Sta. 0+000 - Sta. 0+082, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"AFG CONSTRUCTION CORPORATION","c":9653000.0,"abc":9800000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-04-22","lat":8.8361,"lon":117.49329,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Culasian","wn":"Culasian River","wd":0.01,"wp":[8.83601,117.49323],"wst":"matched","br":null,"len":82.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":509},{"i":638,"cid":"23E00080","pid":"P00736052LZ","t":"Construction of River Bank Protection Works along Bulalacao River, Bataraza, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"BATARAZA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC. / RDF TRADING AND CONSTRUCTION","c":192997857.4,"abc":192999998.0,"fy":"2023","sd":"03/11/2023","cd":"2024-05-31","lat":8.67806,"lon":117.55194,"sm":181,"fm":181,"tm":181,"am":181,"md":0.0,"ls":"inside","ww":"Bulalacao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":510},{"i":639,"cid":"24EF0047","pid":"P00820985LZ","t":"Construction of Ransang River Flood Control Structure, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ZAMBOANGA DEL NORTE","mu":"RIZAL (ZAMBOANGA DEL NORTE)","deo":"Palawan 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48997260.0,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-10-11","lat":8.925833,"lon":117.55583,"sm":1211,"fm":1208,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Ransang","wn":"Ransang River","wd":0.05,"wp":[8.92627,117.55561],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":656.94,"text":"The record contradicts itself: the title and the pin point to Rizal, Palawan, but the municipality field names Rizal, Zamboanga del Norte, 657 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":532},{"i":640,"cid":"23E00184","pid":"P00740415LZ","t":"Construction of Riverbank Protection Structures - Ransang River (Both sides) with Steel Piles, Rizal, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / RDF TRADING AND CONSTRUCTION","c":192997879.7,"abc":192999996.8,"fy":"2023","sd":"04/29/2023","cd":"2024-04-22","lat":8.92602,"lon":117.5562,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Ransang","wn":"Ransang River","wd":0.05,"wp":[8.92646,117.55598],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":511},{"i":641,"cid":"23EF0013","pid":"P00726272LZ","t":"Construction of Ransang River Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 R/S Upstream, Barangay Ransang, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"RIZAL (MARCOS) (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION)","c":24499994.74,"abc":24500000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-12-07","lat":8.92593,"lon":117.55695,"sm":1211,"fm":1211,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Ransang","wn":"Ransang River","wd":0.02,"wp":[8.92584,117.55715],"wst":"matched","br":"Ransang","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":512},{"i":642,"cid":"22EF0067","pid":"P00620660LZ","t":"Construction of Marangas River Flood Control Structure, Sta. 0+800 - Sta. 1+250, Left Bank Sta. 1+080 - Sta. 1+240, Bataraza, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BATARAZA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION)","c":28801312.6,"abc":29400000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-04-15","lat":8.68428,"lon":117.62145,"sm":181,"fm":181,"tm":181,"am":181,"md":0.0,"ls":"inside","ww":"Marangas","wn":"Marangas River","wd":0.04,"wp":[8.68404,117.62119],"wst":"matched","br":null,"len":610.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":513},{"i":643,"cid":"24EF0013","pid":"P00820986LZ","t":"Construction of Salogon River Flood Control Structure, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":48995638.54,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-07-15","lat":8.704898,"lon":117.721743,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Salogon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":514},{"i":644,"cid":"22EF0026","pid":"P00620664LZ","t":"Construction of Salogon River Flood Control Structure, Sta. 0+000 - Sta. 0+520 Right Bank, Sta. 0+360 - Sta. 0+480 Left Bank, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION)","c":39199997.0,"abc":39400000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-01-23","lat":8.703056,"lon":117.7219,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Salogon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":640.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":515},{"i":645,"cid":"23EF0006","pid":"P00725878LZ","t":"Construction of Salogon River Flood Control Structure, Sta. 0+520 - Sta. 1+080 R/S Downstream, Sta. 0+480 - Sta. 0+620 L/S Downstream, Barangay Salogon, Brooke'S Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION)","c":50657737.68,"abc":50662500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-08-25","lat":8.69691,"lon":117.72463,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Salogon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salogon","len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":516},{"i":646,"cid":"24EF0059","pid":"P00820987LZ","t":"Construction of Salongsong River Flood Control Structure, Rizal, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ZAMBOANGA DEL NORTE","mu":"RIZAL (ZAMBOANGA DEL NORTE)","deo":"Palawan 2nd District Engineering Office","co":"L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION)","c":29396659.04,"abc":29400000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-10-03","lat":9.041034,"lon":117.725553,"sm":1211,"fm":1208,"tm":1211,"am":1211,"md":0.0,"ls":"inside","ww":"Salongsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":638.92,"text":"The record contradicts itself: the title and the pin point to Rizal, Palawan, but the municipality field names Rizal, Zamboanga del Norte, 639 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":575},{"i":647,"cid":"24EF0026","pid":"P00820982LZ","t":"Construction of Flood Control, Sitio Butterfly, Barangay Quinlogan, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Palawan 2nd District Engineering Office","co":"DIANE CONSTRUCTION & ENTERPRISES","c":24499188.0,"abc":24500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-08-15","lat":9.13262,"lon":117.80689,"sm":1190,"fm":1189,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quinlogan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":808.85,"text":"The record contradicts itself: the title and the pin point to Quezon, Palawan, but the municipality field names Quezon, Bukidnon, 809 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":576},{"i":648,"cid":"24EF0024","pid":"P00820983LZ","t":"Construction of Lamikan River Flood Control Structure, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Palawan 2nd District Engineering Office","co":"CUTTING EDGE BUILDERS AND TRADING, INC.","c":29399992.5,"abc":29400000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-17","lat":9.13941,"lon":117.810705,"sm":1190,"fm":1189,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Lamikan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":808.56,"text":"The record contradicts itself: the title and the pin point to Quezon, Palawan, but the municipality field names Quezon, Bukidnon, 809 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":577},{"i":649,"cid":"23E00079","pid":"P00736051LZ","t":"Construction of Road Dike/Esplanade along Tigaplan River, Barangay Pangobilian, Brooke's Point, Palawan","w":"Construction of Dike","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"MARCBILT CONSTRUCTION, INC.","c":192991970.0,"abc":192999985.9,"fy":"2023","sd":"04/13/2023","cd":"2024-03-05","lat":8.83056,"lon":117.81694,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Tigaplan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pangobilian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":517},{"i":650,"cid":"23E00073","pid":"P00725864LZ","t":"Construction of Brooke's Point Shore Protection and Causeway Development, District I, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"MARCBILT CONSTRUCTION, INC.","c":45816740.98,"abc":46078749.88,"fy":"2023","sd":"04/13/2023","cd":"2023-09-30","lat":8.77222,"lon":117.84,"sm":232,"fm":232,"tm":null,"am":232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":490},{"i":651,"cid":"22EF0035","pid":"P00620656LZ","t":"Construction of Barong-barong Flood Control Structure, Sta. 0+500 - Sta. 0+745, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"M.C. ESCALA CONSTRUCTION AND SUPPLY","c":11674127.13,"abc":19600000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-07-31","lat":8.885697,"lon":117.844314,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":245.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":518},{"i":652,"cid":"22EF0025","pid":"P00620666LZ","t":"Construction of Tagusao River Flood Control Structure, Sta. 0+070 - Sta. 0+620 Right Riverbank, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"QUEZON (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION)","c":17279673.78,"abc":29400000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-05-23","lat":9.16243,"lon":117.8518,"sm":1190,"fm":1190,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Tagusao","wn":"Tagusao River","wd":0.0,"wp":[9.16246,117.85184],"wst":"matched","br":null,"len":550.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":519},{"i":653,"cid":"23E00072","pid":"P00725862LZ","t":"Construction of Riverbank Protection Structures - RC Dike with Steel Sheet Piles along Salogon River (Both Sides), Brooks Point, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING","c":96497913.06,"abc":96500006.28,"fy":"2023","sd":"03/11/2023","cd":"2024-01-21","lat":8.8135,"lon":117.8533,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Salogon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":520},{"i":654,"cid":"24EF0003","pid":"P00820416LZ","t":"Construction of Tigaplan River Flood Control Structure, Pangobilian, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":53068367.03,"abc":53075000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-10-15","lat":8.81361,"lon":117.85389,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Tigaplan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":521},{"i":655,"cid":"22EF0068","pid":"P00620665LZ","t":"Construction of Tagusao River Flood Control Structure, Sta. 0+000 - Sta. 0+200, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) / C.T. LEONCIO CONSTRUCTION & TRADING","c":39199918.59,"abc":39200000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-07-06","lat":8.82497,"lon":117.86632,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Tagusao","wn":"Tagusao River","wd":26.98,"wp":[9.04842,117.96253],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":522},{"i":656,"cid":"23EF0017","pid":"P00726270LZ","t":"Construction of Lanadio Flood Control Structure, Sta. 0 + 410 - Sta. 0 + 910 B/S Upstream, Barangay Barong-Barong, Brooke'S Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"PTK GROUP INC.","c":44097967.76,"abc":44100000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-15","lat":8.8418,"lon":117.88163,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barong-Barong","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":523},{"i":657,"cid":"22EF0038","pid":"P00620657LZ","t":"Construction of Lanadio Flood Control Structure, Sta. 0+000 - Sta. 0+760, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"M.C. ESCALA CONSTRUCTION AND SUPPLY","c":20226888.84,"abc":29400000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-11-07","lat":8.839738,"lon":117.881715,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":760.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":524},{"i":658,"cid":"24EF0014","pid":"P00820984LZ","t":"Construction of Mambalot CIS Drainage Canal and Slope Protection, Brooke's Point, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"BROOKE'S POINT (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ALMRIN BUILDERS CORPORATION","c":17963797.88,"abc":17966340.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-30","lat":8.880473,"lon":117.91691,"sm":232,"fm":232,"tm":232,"am":232,"md":0.0,"ls":"inside","ww":"Mambalot CIS Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":525},{"i":659,"cid":"23EF0059","pid":"P00726769LZ","t":"Construction of Panitian River Flood Control Structure, Sta. 0 + 131 - Sta. 0 + 280 B/S Downstream, Barangay Panitian, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"QUEZON (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"RDF TRADING AND CONSTRUCTION","c":24499242.58,"abc":24500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-12-15","lat":9.20766,"lon":117.94518,"sm":1190,"fm":1190,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Panitian","wn":"Panitian River","wd":0.02,"wp":[9.20756,117.94506],"wst":"matched","br":"Panitian","len":149.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":526},{"i":660,"cid":"22EF0024","pid":"P00620658LZ","t":"Construction of Malatgao River Flood Control Structure, Sta. 0+000 - Sta. 0+094 Left Riverbank, Sta. 0+020 - Sta. 0+094 Right Riverbank, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"QUEZON (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"R NARRAZID TRADING AND CONSTRUCTION","c":5504750.7,"abc":9800000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-12-31","lat":9.206118,"lon":117.945718,"sm":1190,"fm":1190,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Malatgao","wn":"Malatgao River","wd":50.13,"wp":[9.4491,118.32924],"wst":"matched","br":null,"len":168.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":527},{"i":661,"cid":"22EF0037","pid":"P00621115LZ","t":"Construction of Panitian River Flood Control Structure, Sta. 0+000 - Sta. 0+131, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"QUEZON (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"M.C. ESCALA CONSTRUCTION AND SUPPLY","c":11892174.24,"abc":19600000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-04-10","lat":9.20598,"lon":117.94867,"sm":1190,"fm":1190,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Panitian","wn":"Panitian River","wd":0.03,"wp":[9.20573,117.94863],"wst":"matched","br":null,"len":131.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":528},{"i":662,"cid":"22EF0047","pid":"P00620668LZ","t":"Construction of Tumarbong River Flood Control Structure, Sta. 0+000 - Sta. 0+150, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"QUEZON (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"R NARRAZID TRADING AND CONSTRUCTION","c":5210917.61,"abc":9800000.0,"fy":"2022","sd":"02/21/2022","cd":"2025-02-02","lat":9.26049,"lon":118.05797,"sm":1190,"fm":1190,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Tumarbong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":529},{"i":663,"cid":"23EF0018","pid":"P00726269LZ","t":"Construction of Abo-Abo River Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 200 B/S Upstream, Barangay Abo-Abo, Sofronio Española, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"SOFRONIO ESPAÑOLA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"CUTTING EDGE BUILDERS AND TRADING, INC.","c":24499265.29,"abc":24500000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-07-19","lat":9.15843,"lon":118.11571,"sm":1473,"fm":1473,"tm":1473,"am":1473,"md":0.0,"ls":"inside","ww":"Abo-Abo","wn":"Abo-abo River","wd":0.01,"wp":[9.15843,118.11576],"wst":"matched","br":"Abo-Abo","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":530},{"i":664,"cid":"24EF0060","pid":"P00820980LZ","t":"Construction of Aramaywan River Flood Control Structure, Aramaywan, Quezon, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Palawan 2nd District Engineering Office","co":"RDF TRADING AND CONSTRUCTION","c":29303558.24,"abc":29400000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-07-27","lat":9.37574,"lon":118.145041,"sm":1190,"fm":1189,"tm":1190,"am":1190,"md":0.0,"ls":"inside","ww":"Aramaywan","wn":"Aramaywan River","wd":0.03,"wp":[9.37578,118.14479],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":777.43,"text":"The record contradicts itself: the title and the pin point to Quezon, Palawan, but the municipality field names Quezon, Bukidnon, 777 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":578},{"i":665,"cid":"23E00185","pid":"P00740416LZ","t":"Construction of Cabuluan River Flood Structure, barangay Calategas, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / RDF TRADING AND CONSTRUCTION","c":192997354.3,"abc":192999999.5,"fy":"2023","sd":"04/13/2023","cd":"2024-05-20","lat":9.1686,"lon":118.1802,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Cabuluan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calategas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":531},{"i":666,"cid":"23EF0005","pid":"P00725876LZ","t":"Construction of Batang Batang River Flood Control Structure, Sta 0 + 200 - Sta. 0 + 900 L/S Downstream, Barangay Batang-Batang, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":50662496.45,"abc":50662500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-22","lat":9.22347,"lon":118.32612,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Batang Batang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batang-Batang","len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":532},{"i":667,"cid":"24EF0001","pid":"P00820391LZ","t":"Construction of Batang-batang River Flood Control Structure, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":53004257.5,"abc":53075000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-16","lat":9.221605,"lon":118.326379,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Batang-batang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":533},{"i":668,"cid":"24EG0036","pid":"P00824752LZ","t":"Construction of Babuyan River Flood Control Strucure Downstream (LS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"G. BANZ BUILDERS CORP.","c":17029313.08,"abc":18335000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-24","lat":9.60335,"lon":118.34238,"sm":1180,"fm":1180,"tm":null,"am":0,"md":11.32,"ls":"outside","ww":"Babuyan","wn":"Babuyan River","wd":73.64,"wp":[9.97894,118.89463],"wst":"matched","br":null,"len":null,"ph":null,"dup":[669],"run":[],"cl":[],"L":"records","s":66,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.32,"text":"The pin is 11.3 km outside Puerto Princesa City, Palawan, the nearest municipality the record claims. It falls in Aborlan, Palawan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":73.64,"text":"The title names Babuyan, which OpenStreetMap maps through the stated municipality, but the pin is 73.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 34,399,308.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":60},{"i":669,"cid":"24EG0062","pid":"P00824763LZ","t":"Construction of Flood Control Structure along Apurawan River Downstream (L/S), Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"G. BANZ BUILDERS CORP.","c":17369994.74,"abc":17370000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-06-24","lat":9.60335,"lon":118.34238,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Apurawan","wn":"Apurawan River","wd":0.02,"wp":[9.60337,118.34252],"wst":"matched","br":null,"len":null,"ph":null,"dup":[668],"run":[670,672,671],"cl":[],"L":"records","s":56,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 34,399,308.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24EG0060 to 24EG0063) cover the same site, together worth PHP 65,863,257.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":133},{"i":670,"cid":"24EG0060","pid":"P00824761LZ","t":"Construction of Flood Control Structure along Apurawan River Upstream (L/S), Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":16240699.93,"abc":17370000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-08-20","lat":9.6028,"lon":118.34255,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Apurawan","wn":"Apurawan River","wd":0.01,"wp":[9.60281,118.34261],"wst":"matched","br":null,"len":null,"ph":null,"dup":[671],"run":[672,669,671],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 31,123,274.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24EG0060 to 24EG0063) cover the same site, together worth PHP 65,863,257.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":171},{"i":671,"cid":"24EG0063","pid":"P00824764LZ","t":"Construction of Flood Control Structure along Apurawan River Downstream (R/S), Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"PANAAD CONSTRUCTION","c":14882574.2,"abc":17370000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-18","lat":9.6028,"lon":118.34255,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Apurawan","wn":"Apurawan River","wd":0.01,"wp":[9.60281,118.34261],"wst":"matched","br":null,"len":null,"ph":null,"dup":[670],"run":[670,672,669],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 31,123,274.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24EG0060 to 24EG0063) cover the same site, together worth PHP 65,863,257.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":172},{"i":672,"cid":"24EG0061","pid":"P00824762LZ","t":"Construction of Flood Control Structure along Apurawan River Upstream (R/S), Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":17369987.88,"abc":17370000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-24","lat":9.60286,"lon":118.3429,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Apurawan","wn":"Apurawan River","wd":0.03,"wp":[9.60282,118.3426],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[670,669,671],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24EG0060 to 24EG0063) cover the same site, together worth PHP 65,863,257.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":661},{"i":673,"cid":"22EF0009","pid":"P00620659LZ","t":"Construction of Malinao River Flood Control Structure, Sta. 0+000 - Sta. 0+234 Right Bank, Sta. 0+040 - Sta. 0+240 Left Bank, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"R NARRAZID TRADING AND CONSTRUCTION / RDF TRADING AND CONSTRUCTION","c":28986147.77,"abc":29400000.0,"fy":"2022","sd":"07/03/2022","cd":"2023-05-31","lat":9.24709,"lon":118.3694,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Malinao","wn":"Malinao River","wd":0.01,"wp":[9.24711,118.36935],"wst":"matched","br":null,"len":434.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":534},{"i":674,"cid":"22EF0008","pid":"P00631315LZ","t":"Construction of Panacan Seawall, Brgy. Panacan, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":29399879.54,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-10","lat":9.24392,"lon":118.4011,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":535},{"i":675,"cid":"23EF0075","pid":"P00742462LZ","t":"Construction of Panacan Seawall, Brgy. Panacan, Municipality of Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"MEGA TAM SUMMIT INCORPORATED","c":19550848.57,"abc":19600000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-08-31","lat":9.243908,"lon":118.401122,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":536},{"i":676,"cid":"21EF0094","pid":"P00526167LZ","t":"Construction of Narra Poblacion Flood Control Structure, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"Narra","deo":"Palawan 2nd District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":30353588.62,"abc":30354520.0,"fy":"2021","sd":"04/13/2021","cd":"2022-08-01","lat":9.26332,"lon":118.401385,"sm":1011,"fm":null,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":537},{"i":677,"cid":"22EF0036","pid":"P00620661LZ","t":"Construction of Narra Poblacion Flood Control, Sta. 0+000 - Sta. 1+790, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":39324618.9,"abc":47040000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-08-31","lat":9.26956,"lon":118.4046,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1790.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":538},{"i":678,"cid":"23E00071","pid":"P00725861LZ","t":"Construction of Riverbank Protection Structures - RC Dike with Steel Sheet Piles along Panacan River (Both Sides), Narra, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING","c":96497566.17,"abc":96499995.64,"fy":"2023","sd":"03/11/2023","cd":"2024-01-16","lat":9.2765,"lon":118.4062,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Panacan","wn":"Panacan River","wd":0.0,"wp":[9.27651,118.40623],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":539},{"i":679,"cid":"24EF0002","pid":"P00820404LZ","t":"Construction of Panacan River Flood Control Structure, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":53063470.45,"abc":53075000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-11-15","lat":9.272371,"lon":118.409898,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Panacan","wn":"Panacan River","wd":0.06,"wp":[9.2718,118.40984],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":540},{"i":680,"cid":"23EF0048","pid":"P00725877LZ","t":"Construction of Panacan River Flood Control Structure, Sta. 0 + 070 - Sta. 0 + 770 R/S Upstream, Barangay Poblacion, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":50418886.99,"abc":50421250.0,"fy":"2023","sd":"02/20/2023","cd":"2024-09-01","lat":9.27135,"lon":118.41142,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":"Panacan","wn":"Panacan River","wd":0.01,"wp":[9.27133,118.41131],"wst":"matched","br":"Poblacion","len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":541},{"i":681,"cid":"22EF0083","pid":"P00620667LZ","t":"Construction of Taritien Flood Control Structure, Sta. 0+000 - Sta. 0+300, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"ALMRIN BUILDERS CORPORATION","c":21749296.29,"abc":29400000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-12-20","lat":9.30296,"lon":118.4747,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":542},{"i":682,"cid":"23EF0060","pid":"P00726271LZ","t":"Construction of Malatgao Seaside Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 L/S Downstream, Barangay Malatgao, Narra, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"NARRA (PALAWAN)","deo":"Palawan 2nd District Engineering Office","co":"SAMURAI CONSTRUCTION","c":21653583.72,"abc":24500000.0,"fy":"2023","sd":"06/16/2023","cd":"2024-02-10","lat":9.30361,"lon":118.49167,"sm":1011,"fm":1011,"tm":1011,"am":1011,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malatgao","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":543},{"i":683,"cid":"23E00091","pid":"P00726601LZ","t":"Construction of Aborlan River Waterway, Puerto Princesa South Road, Aborlan, Palawan","w":"Construction of Waterway","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING","c":120268876.0,"abc":120624999.4,"fy":"2023","sd":"03/11/2023","cd":"2023-12-10","lat":9.4282,"lon":118.5412,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Aborlan","wn":"Aborlan River","wd":0.0,"wp":[9.42817,118.54121],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":544},{"i":684,"cid":"24E00133","pid":"P00823564LZ","t":"Construction of Aborlan River Waterway, (Downstream Leftside) Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC.","c":154398410.8,"abc":154400000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-12-05","lat":9.428863,"lon":118.5451,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Aborlan","wn":"Aborlan River","wd":0.05,"wp":[9.42846,118.54486],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":545},{"i":685,"cid":"24E00181","pid":"P00845836LZ","t":"Construction of Flood Control Structure along Iraan River Upstream, Brgy. Iraan (L/S), Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC.","c":98999956.57,"abc":98999999.99,"fy":"2024","sd":"05/21/2024","cd":"2024-11-05","lat":9.456676,"lon":118.546745,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Iraan","wn":"Iraan River","wd":0.17,"wp":[9.4557,118.54792],"wst":"matched","br":"Iraan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":546},{"i":686,"cid":"23E00187","pid":"P00740432LZ","t":"Construction of Flood Control Structure along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC.","c":212295699.4,"abc":212299999.5,"fy":"2023","sd":"04/13/2023","cd":"2024-03-07","lat":9.44833,"lon":118.54833,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Iraan","wn":"Iraan River","wd":0.0,"wp":[9.44835,118.54833],"wst":"matched","br":"Iraan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":547},{"i":687,"cid":"22EG0066","pid":"P00620901LZ","t":"Construction of Flood Mitigation Structure, Iraan River Waterways Phase 3, Left Bank Sta. 0+000 - Sta. 0+380, Right Bank Sta. 0+107 - Sta. 0+364, Upper Left Bank Sta. 0+389 - Sta. 0+503, Aborlan, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"ABORLAN (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING","c":96496704.82,"abc":96500000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-15","lat":9.43673,"lon":118.55263,"sm":0,"fm":0,"tm":0,"am":0,"md":0.0,"ls":"inside","ww":"Iraan","wn":"Iraan River","wd":0.02,"wp":[9.43684,118.55274],"wst":"matched","br":null,"len":751.0,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":548},{"i":688,"cid":"25EG0013","pid":"P00921211LZ","t":"Construction of Slope Protection Structure, Inagawan CIS, Puerto Princesa City, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"KRATOS STRUCPRIME CONSTRUCTION AND SUPPLY CORP","c":14669999.48,"abc":14700000.0,"fy":"2025","sd":"02/05/2025","cd":"2025-05-19","lat":9.55414,"lon":118.61825,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":549},{"i":689,"cid":"24E00180","pid":"P00844553LZ","t":"Construction of River Bank Protection Structure along Irawan River Upstream, Barangay Irawan, Puerto Princesa City, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC.","c":194927222.8,"abc":194930000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-12-05","lat":9.802191,"lon":118.693052,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":"Irawan","wn":"Irawan River","wd":0.01,"wp":[9.80207,118.69303],"wst":"matched","br":"Irawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":550},{"i":690,"cid":"23E00188","pid":"P00740433LZ","t":"Construction of River Bank Protection Structures along Irawan River Downstream (R/S), Barangay Irawan, Puerto Princesa City, Palawan","w":"Construction of Revetment","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Palawan 3rd District Engineering Office","co":"YURICH BUILDERS AND CONSTRUCTION SUPPLY INC.","c":212296975.9,"abc":212299999.4,"fy":"2023","sd":"04/13/2023","cd":"2024-03-07","lat":9.8,"lon":118.69361,"sm":1180,"fm":1017,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":"Irawan","wn":"Irawan River","wd":0.03,"wp":[9.80011,118.69389],"wst":"matched","br":"Irawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":451.14,"text":"The record contradicts itself: the title and the pin point to Puerto Princesa City, Palawan, but the municipality field names Naujan, Oriental Mindoro, 451 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":154},{"i":691,"cid":"24EG0054","pid":"P00824755LZ","t":"Construction of River Waterway Enhancement Structure along Irawan River Downstream (R/S), Barangay Irawan, Puerto Princesa, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"MACASAET BUILDERS AND TRADING","c":17369942.66,"abc":17370000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-22","lat":9.79646,"lon":118.69651,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":"Irawan","wn":"Irawan River","wd":0.01,"wp":[9.79648,118.69657],"wst":"matched","br":"Irawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":551},{"i":692,"cid":"24EG0047","pid":"P00824753LZ","t":"Construction of River Waterway Enhancement Structure along Irawan River Upstream (R/S), Barangay Irawan, Puerto Princesa, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION","c":17369970.05,"abc":17370000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-12","lat":9.79961,"lon":118.69668,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":"Irawan","wn":"Irawan River","wd":0.02,"wp":[9.79971,118.69678],"wst":"matched","br":"Irawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":552},{"i":693,"cid":"24EG0053","pid":"P00824754LZ","t":"Construction of River Waterway Enhancement Structure along Irawan River Downstream (L/S), Barangay Irawan, Puerto Princesa, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"MGB CONSTRUCTION & TRADING","c":17369990.32,"abc":17370000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-12","lat":9.79867,"lon":118.69712,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":"Irawan","wn":"Irawan River","wd":0.01,"wp":[9.79871,118.69704],"wst":"matched","br":"Irawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":553},{"i":694,"cid":"22EG0020","pid":"P00632935LZ","t":"Construction of Drainage System along Barangay Maligaya, City of Puerto Princesa, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"F.F. GALANG CONSTRUCTION","c":4851100.32,"abc":4950000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-05","lat":9.74072,"lon":118.73106,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maligaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":554},{"i":695,"cid":"22EG0040","pid":"P00637809LZ","t":"Drainage construction at Pineda Road, Barangay San Pedro, City of Puerto Princesa, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"F.F. GALANG CONSTRUCTION","c":4359361.95,"abc":4950000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-09","lat":9.75789,"lon":118.74456,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":555},{"i":696,"cid":"23EG0014","pid":"P00737552LZ","t":"Construction of Drainage Structure, Barangay San Miguel, Puerto Princesa City, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"SMMILEY BUILDERS AND TRADING","c":4900000.0,"abc":4900000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-09-27","lat":9.750222,"lon":118.748308,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":556},{"i":697,"cid":"22EG0042","pid":"P00637810LZ","t":"Drainage construction at Barangay Kalipay, City of Puerto Princesa, Palawan","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"N. SALES CONSTRUCTION","c":4205703.56,"abc":4950000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-04","lat":9.73886,"lon":118.76308,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kalipay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":557},{"i":698,"cid":"22E00132","pid":"P00620265LZ","t":"Construction of Flood Mitigation Structure and Drainage Systems Phase I, Puerto Princesa North Road, Barangay San Manuel to Outfall, Sta. 0+000 - Sta. 0+556.40, Puerto Princesa, Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"HARDROCKPLATINUM DEVELOPMENT CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING","c":96496299.03,"abc":96499990.14,"fy":"2022","sd":"07/06/2022","cd":"2023-12-20","lat":9.77199,"lon":118.773389,"sm":1180,"fm":1180,"tm":1180,"am":1180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Manuel","len":556.4,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":558},{"i":699,"cid":"24EG0029","pid":"P00824751LZ","t":"Construction of Babuyan River Flood Control Strucure Upstream (RS), Palawan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"PALAWAN","mu":"PUERTO PRINCESA CITY (CAPITAL) (PALAWAN)","deo":"Palawan 3rd District Engineering Office","co":"PANAAD CONSTRUCTION","c":18334889.53,"abc":18335000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-17","lat":9.99275,"lon":118.89238,"sm":1180,"fm":1180,"tm":null,"am":1180,"md":0.0,"ls":"inside","ww":"Babuyan","wn":"Babuyan River","wd":0.19,"wp":[9.99298,118.8941],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":559},{"i":700,"cid":"24E00035","pid":"P00823573LZ","t":"Construction of Road Dike/Esplanade along Sitio Anduyanan, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":289495739.8,"abc":289500000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-12-07","lat":13.42216,"lon":120.494353,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":560},{"i":701,"cid":"21AD0029","pid":"P00561481LZ","t":"Construction of Cabugao Flood Control, Barangay Cabugao, Suyo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"Suyo","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":9799946.61,"abc":9800000.0,"fy":"2021","sd":"10/11/2021","cd":"2022-12-01","lat":16.959872,"lon":120.494533,"sm":1498,"fm":null,"tm":1498,"am":1498,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabugao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":561},{"i":702,"cid":"24EB0101","pid":"P00820408LZ","t":"Construction of Riverside Protection Structure along Apnikan River, Paluan, Mindoro Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96494249.47,"abc":96500000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-06-15","lat":13.333607,"lon":120.495157,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Apnikan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":562},{"i":703,"cid":"23A00073","pid":"P00725624LZ","t":"Rehabilitation of Flood Control Structure On Scoured and Eroded River Bank along Badoc River, barangay Las-ud and San Julian, Badoc, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":125449993.7,"abc":125450000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-07-18","lat":17.92147,"lon":120.49567,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Eroded","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Las-ud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":563},{"i":704,"cid":"22AD0099","pid":"P00621511LZ","t":"Construction of Cabugao Flood Control, Suyo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SUYO (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"KVC CONSTRUCTION","c":19599716.72,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-30","lat":16.96184,"lon":120.49633,"sm":1498,"fm":1498,"tm":1498,"am":1498,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":564},{"i":705,"cid":"23A00076","pid":"P00725587LZ","t":"Construction of Currimao Seawall Protection, Currimao, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CURRIMAO (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":28949979.06,"abc":28950000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-12-18","lat":17.993019,"lon":120.497092,"sm":467,"fm":467,"tm":467,"am":467,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":565},{"i":706,"cid":"24AI0067","pid":"P00845909LZ","t":"Construction of Flood Control System (Riverbank Structure along Sinucalan and Allied River Package 2) Barangay San Jose-Pinmaludpod, Urdaneta City, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE)","c":29650972.66,"abc":29700000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-08-30","lat":15.98597,"lon":120.497247,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose-Pinmaludpod","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":566},{"i":707,"cid":"23CB0020","pid":"P00725710LZ","t":"Construction of Flood Control Structure along Abo-abo River (Upstream) City of Balanga, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":53075000.0,"abc":53072166.23,"fy":"2023","sd":"02/20/2023","cd":"2023-06-26","lat":14.651511,"lon":120.497263,"sm":366,"fm":366,"tm":null,"am":366,"md":0.0,"ls":"inside","ww":"Abo-abo","wn":"Abo-abo River","wd":0.04,"wp":[14.6518,120.49746],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":567},{"i":708,"cid":"23CA0029","pid":"P00727124LZ","t":"Construction of Flood Control Structure along Sapang Balsik Tributary to Almacen River (Phase II-AA), Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48999982.96,"abc":48999999.71,"fy":"2023","sd":"03/13/2023","cd":"2023-10-11","lat":14.859735,"lon":120.497608,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Sapang Balsik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":568},{"i":709,"cid":"22AD0044","pid":"P00632740LZ","t":"Construction of Ambugat Flood Control, Barangay Ambugat, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":4899981.03,"abc":4900000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-04-17","lat":17.32169,"lon":120.497902,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ambugat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":569},{"i":710,"cid":"23AD0042","pid":"P00727075LZ","t":"Construction of Sta. Maria River Control, Barangay Nagpanaoan - Subadi Norte - Subadi Sur, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48999357.69,"abc":49000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-07-31","lat":17.332623,"lon":120.498553,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.05,"wp":[17.33261,120.49901],"wst":"matched","br":"Nagpanaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":570},{"i":711,"cid":"24AI0036","pid":"P00821510LZ","t":"Construction of Flood Mitigation Structure along Sinucalan River, Barangay San Jose, Urdaneta City, Pangasinan (Package 1)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.G.TABIN CONSTRUCTION AND SUPPLY / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48918015.87,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-04-30","lat":15.98912,"lon":120.498722,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":0.01,"wp":[15.98911,120.49881],"wst":"matched","br":"San Jose","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":571},{"i":712,"cid":"22AD0047","pid":"P00632738LZ","t":"Construction of Macaoayan Flood Control, Barangay Macaoayan, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":4899983.4,"abc":4900000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-04-05","lat":17.32909,"lon":120.49895,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macaoayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":572},{"i":713,"cid":"23AD0069","pid":"P00742263LZ","t":"Construction of Flood Control Brgy. Ambugat, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9602987.5,"abc":9900000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-20","lat":17.329167,"lon":120.499167,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ambugat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":573},{"i":714,"cid":"23CA0017","pid":"P00727356LZ","t":"Construction of Flood Control project along Pulo-Almacen River, Phase VI-1A, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":29105999.82,"abc":29105999.82,"fy":"2023","sd":"03/13/2023","cd":"2023-09-06","lat":14.841113,"lon":120.499432,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Pulo-Almacen","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":574},{"i":715,"cid":"23AB0064","pid":"P00736178LZ","t":"Rehabilitation of Currimao Seawall, Currimao, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CURRIMAO (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48020000.0,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-12-05","lat":17.99381,"lon":120.49951,"sm":467,"fm":467,"tm":467,"am":467,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":575},{"i":716,"cid":"23CB0008","pid":"P00737450LZ","t":"Construction of Flood Control Structure, Dangcol, Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":14850000.0,"abc":14699999.1,"fy":"2023","sd":"02/08/2023","cd":"2023-05-24","lat":14.650451,"lon":120.499701,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":947},{"i":717,"cid":"22CA0039","pid":"P00631170LZ","t":"Construction of Flood Control Structure along Hermosa River, San Pedro Section Phase RSA-II, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48999995.93,"abc":48999999.61,"fy":"2022","sd":"04/04/2022","cd":"2022-10-06","lat":14.825464,"lon":120.499719,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Hermosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":576},{"i":718,"cid":"23AD0074","pid":"P00742268LZ","t":"Construction of Brgy. Ambugat Flood Control, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"CZMAC CONSTRUCTION SERVICES","c":9887142.35,"abc":9900000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-19","lat":17.328611,"lon":120.499722,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ambugat Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":577},{"i":719,"cid":"22AH0136","pid":"P00641867LZ","t":"Construction of Riverbank Protection at Barangay Oraan West, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":37644065.34,"abc":39200000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-04-16","lat":16.018552,"lon":120.500187,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Oraan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":578},{"i":720,"cid":"22AI0063","pid":"P00620967LZ","t":"Construction of Flood Control Structure along Andulan River, Brgy. Capitan Tomas, Rosales, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":47531186.52,"abc":49000000.0,"fy":"2022","sd":"03/08/2022","cd":"2023-01-24","lat":15.90778,"lon":120.50033,"sm":1215,"fm":1215,"tm":1215,"am":891,"md":10.37,"ls":"outside","ww":"Andulan","wn":"Andulan River","wd":13.06,"wp":[15.89912,120.62193],"wst":"matched","br":"Capitan Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.37,"text":"The pin is 10.4 km outside Rosales, Pangasinan, the nearest municipality the record claims. It falls in Malasiqui, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.72,"value":13.06,"text":"The title names Andulan, which OpenStreetMap maps through the stated municipality, but the pin is 13.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":72},{"i":721,"cid":"23A00072","pid":"P00725599LZ","t":"Construction of Flood Control Structure along Badoc River Barangay San Julian, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":48249998.15,"abc":48250000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-07-31","lat":17.9247,"lon":120.50156,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.13,"wp":[17.92583,120.50109],"wst":"matched","br":"San Julian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":579},{"i":722,"cid":"24CA0023","pid":"P00839572LZ","t":"Construction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":9899999.43,"abc":9899999.43,"fy":"2024","sd":"03/18/2024","cd":"2024-06-13","lat":14.84087,"lon":120.50165,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulo","len":null,"ph":null,"dup":[723],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 39,599,999.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1008},{"i":723,"cid":"24CA0054","pid":"P00845963LZ","t":"Construction of Flood Control Project along Pulo-Almacen River Phase VII - CMD, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":29699999.9,"abc":29699999.9,"fy":"2024","sd":"04/23/2024","cd":"2024-09-19","lat":14.84087,"lon":120.50165,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Pulo-Almacen","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase VII","dup":[722],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 39,599,999.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":979},{"i":724,"cid":"24AI0057","pid":"P00820721LZ","t":"Construction of Flood Mitigation Structure along Sinucalan River, Barangay San Jose, Urdaneta City, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48143361.81,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-10-04","lat":15.990573,"lon":120.501887,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":0.01,"wp":[15.99067,120.50181],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":580},{"i":725,"cid":"24CA0010","pid":"P00820802LZ","t":"Construction of Flood Control Structure along Hermosa River (Phase III), Hermosa, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":48999999.92,"abc":48999999.7,"fy":"2024","sd":"02/16/2024","cd":"2024-07-02","lat":14.828069,"lon":120.502278,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Hermosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":581},{"i":726,"cid":"24CB0062","pid":"P00824694LZ","t":"Construction of Flood Control Structure along Abo - Abo River (Dangcol Bridge Section), Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"DAJ BUILDERS","c":9572581.7,"abc":9800000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-07-01","lat":14.648767,"lon":120.502886,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Abo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":582},{"i":727,"cid":"22AH0071","pid":"P00631086LZ","t":"Construction of Riverbank Protection at Brgy. Sapang, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":14697245.89,"abc":14700000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-06-30","lat":16.049411,"lon":120.503231,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":583},{"i":728,"cid":"22AH0126","pid":"P00637050LZ","t":"Construction of Riverbank Protection at Brgy. Sapang, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":24007055.11,"abc":24010000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-01-04","lat":16.052292,"lon":120.503594,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":584},{"i":729,"cid":"22AH0069","pid":"P00631084LZ","t":"Construction of Riverbank Protection at Brgy. Pao, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":29397356.15,"abc":29400000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-10-31","lat":16.051353,"lon":120.503953,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":585},{"i":730,"cid":"23AB0096","pid":"P00727057LZ","t":"Construction of Flood Control Structures along Quiaoit River, Brgy. Cayubog, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"04/24/2023","cd":"2023-08-06","lat":18.06036,"lon":120.50456,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":1.84,"wp":[18.06725,120.48872],"wst":"matched","br":"Cayubog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":586},{"i":731,"cid":"23CA0012","pid":"P00726146LZ","t":"Construction of Damaged Flood Control Structure Barangay Pulo, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19599999.58,"abc":19599999.58,"fy":"2023","sd":"02/27/2023","cd":"2023-09-14","lat":14.840165,"lon":120.504636,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":587},{"i":732,"cid":"23CB0026","pid":"P00725711LZ","t":"Construction of Flood Control Structure along Abo-abo River (Downstream) City of Balanga, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"DAJ BUILDERS / POLYMER-VIC CONSTRUCTION","c":57900000.0,"abc":57895440.56,"fy":"2023","sd":"02/20/2023","cd":"2023-12-28","lat":14.648896,"lon":120.505618,"sm":366,"fm":366,"tm":null,"am":366,"md":0.0,"ls":"inside","ww":"Abo-abo","wn":"Abo-abo River","wd":0.03,"wp":[14.64865,120.50564],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":588},{"i":733,"cid":"21AD0045","pid":"P00561480LZ","t":"Construction of Burgos Flood Control (Phase II), Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"Burgos","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":9799963.07,"abc":9800000.0,"fy":"2021","sd":"10/11/2021","cd":"2022-09-07","lat":17.316321,"lon":120.506405,"sm":259,"fm":null,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":589},{"i":734,"cid":"22A00233","pid":"P00621274LZ","t":"Construction of Flood Control Structure along Badoc River, Brgy. Bato, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499997.59,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-05","lat":17.921139,"lon":120.506998,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.29,"wp":[17.92248,120.5093],"wst":"matched","br":"Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":590},{"i":735,"cid":"22AH0112","pid":"P00620460LZ","t":"Rehabilitation of Riverbank Protection along Aloragat River at Brgy. Nalsian, Manaoag, Pangasinan","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":24497954.52,"abc":24500000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-08-07","lat":16.025688,"lon":120.507232,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.04,"wp":[16.02537,120.50712],"wst":"matched","br":"Nalsian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":591},{"i":736,"cid":"23AD0049","pid":"P00727082LZ","t":"Construction of Balaweg-Cayapa River Control, Balaweg, Nagbukel, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"NAGBUKEL (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":9503793.64,"abc":9800000.0,"fy":"2023","sd":"04/26/2023","cd":"2024-05-30","lat":17.429154,"lon":120.507578,"sm":1004,"fm":1004,"tm":1004,"am":1012,"md":0.43,"ls":"boundary","ww":"Balaweg-Cayapa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":592},{"i":737,"cid":"22AD0101","pid":"P00621514LZ","t":"Construction of Burgos Flood Control, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":28526172.61,"abc":29400000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-29","lat":17.315234,"lon":120.507809,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":593},{"i":738,"cid":"22AH0135","pid":"P00639433LZ","t":"Construction of Riverbank Protection Structure at Brgy. Sapang, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":27437043.92,"abc":27440000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-03-08","lat":16.055328,"lon":120.508097,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":594},{"i":739,"cid":"23AD0073","pid":"P00742267LZ","t":"Construction of Brgy Luna Flood Control System, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9602986.95,"abc":9900000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-05-29","lat":17.312796,"lon":120.510204,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Luna Flood Control System","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":595},{"i":740,"cid":"24AJ0071","pid":"P00844728LZ","t":"Construction of Drainage Structure in Tobor National High School, Malasiqui, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"EXTENSIVE STEEL WORKS AND CONSTRUCTION","c":4899968.34,"abc":4900000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-10-15","lat":15.883,"lon":120.511,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":596},{"i":741,"cid":"23AB0150","pid":"P00726848LZ","t":"Construction of Flood Control Structures along Nagrangtayan Creek (Upstream and Downstream of Nagrantayan Bridge), Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":9650000.0,"abc":9650000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-08-23","lat":18.07181,"lon":120.51123,"sm":1099,"fm":1340,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Nagrangtayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":7.67,"text":"The record contradicts itself: the title and the pin point to Paoay, Ilocos Norte, but the municipality field names San Nicolas, Ilocos Norte, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":617},{"i":742,"cid":"24AD0052","pid":"P00845896LZ","t":"Construction of Brgy. Luna River Control, Burgos, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MRK-SQUARE CONSTRUCTION AND SUPPLY","c":19203924.66,"abc":19800000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-08-10","lat":17.30925,"lon":120.51135,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":"Brgy. Luna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Luna River Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":597},{"i":743,"cid":"23CH0034","pid":"P00742345LZ","t":"Construction of Slope Protection along Gumain River, Cabangcalan Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TONKA CONSTRUCTION","c":29693975.45,"abc":29699280.6,"fy":"2023","sd":"04/05/2023","cd":"2023-09-07","lat":14.946389,"lon":120.511667,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Gumain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[744],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 78,679,775.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":980},{"i":744,"cid":"23CH0081","pid":"P00740606LZ","t":"Construction of Slope Protection with Road Dike along Gumain River, Barangay Cabangcalan, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TONKA CONSTRUCTION","c":48985800.03,"abc":48999000.52,"fy":"2023","sd":"06/14/2023","cd":"2023-12-10","lat":14.946389,"lon":120.511667,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Gumain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabangcalan","len":null,"ph":null,"dup":[743],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 78,679,775.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":893},{"i":745,"cid":"22CH0004","pid":"P00620181LZ","t":"Construction of Slope Protection (with spurdike) along Pasig-Potrero River, Manuali, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ALL EML CONSTRUCTION CORPORATION (FORMERLY: E.M.L. CONSTRUCTION & TRADING)","c":96200987.74,"abc":96209725.55,"fy":"2022","sd":"03/07/2022","cd":"2023-05-11","lat":15.135082,"lon":120.51212,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Pasig-Potrero","wn":"Pasig-Potrero River","wd":0.07,"wp":[15.13464,120.51163],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":598},{"i":746,"cid":"22AH0144","pid":"P00640501LZ","t":"Construction of Riverbank Protection, Brgy. Sapang, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":29696964.87,"abc":29700000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-07-28","lat":16.057239,"lon":120.512189,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":599},{"i":747,"cid":"21PA0247","pid":"P00561500LZ","t":"Construction of Mausoc - Labaan Flood Control Structure, Sta. 0+000 - Sta. 0+500, San Quintin, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"San Quintin","deo":"Abra District Engineering Office","co":"R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION)","c":48997244.21,"abc":49000000.0,"fy":"2021","sd":"01/07/2022","cd":"2022-09-07","lat":17.537806,"lon":120.512196,"sm":1351,"fm":null,"tm":1351,"am":1351,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":600},{"i":748,"cid":"22CH0080","pid":"P00639364LZ","t":"Rehabilitation of Bank Protection along Pasig-Potrero River, Manuali (Phase 1), Porac, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":96493110.28,"abc":96499186.48,"fy":"2022","sd":"06/01/2022","cd":"2023-12-18","lat":15.13564,"lon":120.512412,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Pasig-Potrero","wn":"Pasig-Potrero River","wd":0.14,"wp":[15.13469,120.51158],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":601},{"i":749,"cid":"22AD0102","pid":"P00621497LZ","t":"Construction of Paoc Norte-Bani-Palali Sur-Damacuag Flood Control, Sta. Lucia, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA LUCIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":39199988.57,"abc":39200000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-30","lat":17.113056,"lon":120.5125,"sm":1388,"fm":1388,"tm":1388,"am":1388,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":602},{"i":750,"cid":"22CH0014","pid":"P00631246LZ","t":"Construction of Flood Control Structure, Gumain River, Cabangcalan Section, Barangay Cabangcalan, Floridablanca, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":19578207.58,"abc":19599039.15,"fy":"2022","sd":"02/21/2022","cd":"2022-07-20","lat":14.946272,"lon":120.512797,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Gumain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabangcalan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":603},{"i":751,"cid":"24CA0017","pid":"P00820222LZ","t":"Construction of Flood Control Structure along Tuyo River (Phase II-DM), Abucay, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":96499999.65,"abc":96499999.65,"fy":"2024","sd":"03/06/2024","cd":"2024-11-07","lat":14.700242,"lon":120.513381,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":"Tuyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":604},{"i":752,"cid":"23AB0151","pid":"P00726849LZ","t":"Construction of Flood Control Structures along Quiaoit River, Brgy. Laoa, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":9625000.0,"abc":9650000.0,"fy":"2023","sd":"05/22/2023","cd":"2023-08-24","lat":18.06312,"lon":120.51339,"sm":1099,"fm":1340,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.9,"wp":[18.06441,120.52176],"wst":"matched","br":"Laoa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.27,"text":"The record contradicts itself: the title and the pin point to Paoay, Ilocos Norte, but the municipality field names San Nicolas, Ilocos Norte, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":618},{"i":753,"cid":"24A00446","pid":"P00848607LZ","t":"Rehabilitation of Flood Control along Galpac Creek, Paoay, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":98999993.62,"abc":99000000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-11-16","lat":18.037042,"lon":120.514002,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Galpac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":605},{"i":754,"cid":"24AE0052","pid":"P00820711LZ","t":"Construction of Flood Mitigation Structure along Barangay Namaltugan, Sudipen, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SUDIPEN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":28948715.87,"abc":29249976.07,"fy":"2024","sd":"04/30/2024","cd":"2024-12-13","lat":16.919547,"lon":120.514466,"sm":1484,"fm":1484,"tm":1484,"am":1520,"md":0.16,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Namaltugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":606},{"i":755,"cid":"23CH0054","pid":"P00740605LZ","t":"Construction of Slope Protection along Gumain River, Cabangcalan Section, Floridablanca, Pampanga, Phase I","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TONKA CONSTRUCTION","c":48990844.14,"abc":48999353.47,"fy":"2023","sd":"04/26/2023","cd":"2023-10-22","lat":14.946389,"lon":120.514722,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Gumain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":607},{"i":756,"cid":"24CA0048","pid":"P00823393LZ","t":"Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":96499999.74,"abc":96499999.74,"fy":"2024","sd":"04/23/2024","cd":"2024-12-03","lat":14.838484,"lon":120.515399,"sm":615,"fm":615,"tm":615,"am":615,"md":0.0,"ls":"inside","ww":"Pulo-Almacen","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":608},{"i":757,"cid":"21AD0063","pid":"P00525872LZ","t":"Construction of Alilem Flood Control, Alilem, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"Alilem","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":18815968.03,"abc":19600000.0,"fy":"2021","sd":"10/11/2021","cd":"2022-12-02","lat":16.902222,"lon":120.516389,"sm":39,"fm":null,"tm":39,"am":39,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":609},{"i":758,"cid":"23CA0039","pid":"P00727122LZ","t":"Construction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48999991.82,"abc":48999999.93,"fy":"2023","sd":"04/27/2023","cd":"2023-12-28","lat":14.697956,"lon":120.516393,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":"Tuyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":610},{"i":759,"cid":"23AH0075","pid":"P00727093LZ","t":"Construction of Riverbank Protection, Brgy. Lipit Sur, Manaoag, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":29395997.13,"abc":29400000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-12-08","lat":16.06677,"lon":120.5165,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lipit Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":611},{"i":760,"cid":"23CA0050","pid":"P00742311LZ","t":"Construction of Flood Control Project along Catmon River, Abucay, Bataan (Phase III-AA)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"AS MACHA CONSTRUCTION AND TRADING","c":9899964.83,"abc":9900000.0,"fy":"2023","sd":"07/10/2023","cd":"2023-12-06","lat":14.730061,"lon":120.516612,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":"Catmon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":612},{"i":761,"cid":"23AH0076","pid":"P00727094LZ","t":"Construction of Riverbank Protection, Brgy. Lipit Norte, Manaoag, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":29396193.97,"abc":29400000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-11-10","lat":16.06938,"lon":120.5171,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lipit Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":613},{"i":762,"cid":"23CA0062","pid":"P00742312LZ","t":"Construction of Diversion Dam, Brgy. Capitangan, Abucay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"JEPA CONSTRUCTION & SUPPLIES","c":9899999.8,"abc":9899999.8,"fy":"2023","sd":"10/03/2023","cd":"2023-12-27","lat":14.7035,"lon":120.5181,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capitangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":614},{"i":763,"cid":"24AB0064","pid":"P00845885LZ","t":"Construction of River Control Structure, Barangays Cabaroan and Liliputen, Pinili, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PINILI (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-06-23","lat":17.94007,"lon":120.51814,"sm":1143,"fm":1143,"tm":1143,"am":1143,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaroan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":615},{"i":764,"cid":"22CB0073","pid":"P00637068LZ","t":"Rehabilitation of Slope Protection along Mariveles Zigzag Road, FAB, Mariveles, Bataan","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"BATAAN","mu":"MARIVELES (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"A.T.P. CONSTRUCTION","c":24500000.0,"abc":24499999.72,"fy":"2022","sd":"04/08/2022","cd":"2023-01-23","lat":14.452825,"lon":120.518163,"sm":943,"fm":943,"tm":943,"am":943,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":616},{"i":765,"cid":"23AD0016","pid":"P00726051LZ","t":"Construction of Flood Control Structure, Santa Maria River, Barangay Silag, Santa Maria, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA MARIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION)","c":29399959.6,"abc":29400000.0,"fy":"2023","sd":"02/10/2023","cd":"2024-02-27","lat":17.363494,"lon":120.518211,"sm":1392,"fm":1392,"tm":1392,"am":1392,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":1.53,"wp":[17.35479,120.50708],"wst":"matched","br":"Silag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":617},{"i":766,"cid":"23CA0040","pid":"P00727123LZ","t":"Construction of Flood Control Structure along Tapulao River (Phase II-AA), Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48999999.97,"abc":48999999.97,"fy":"2023","sd":"04/17/2023","cd":"2023-10-19","lat":14.812192,"lon":120.518844,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Tapulao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":618},{"i":767,"cid":"23A00248","pid":"P00726844LZ","t":"Construction of Quiaoit River Diversion Canal (Cut-Off Channel), Batac City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":53074852.19,"abc":53075000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-01-26","lat":18.0399,"lon":120.519,"sm":367,"fm":367,"tm":367,"am":1099,"md":1.54,"ls":"adjacent","ww":"Quiaoit","wn":"Quiaoit River","wd":2.68,"wp":[18.06375,120.52356],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":619},{"i":768,"cid":"23AD0047","pid":"P00727080LZ","t":"Construction of Alilem Flood Control, Alilem, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"ALILEM (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":14699383.62,"abc":14700000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-05-29","lat":16.917088,"lon":120.51918,"sm":39,"fm":39,"tm":39,"am":39,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":620},{"i":769,"cid":"22AD0065","pid":"P00621512LZ","t":"Construction of Alilem Flood Control, Alilem, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"ALILEM (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19599852.17,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-18","lat":16.91556,"lon":120.51921,"sm":39,"fm":39,"tm":39,"am":39,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":621},{"i":770,"cid":"23AB0152","pid":"P00726852LZ","t":"Construction/Improvement of Flood Control Structure along Cayubog Creek, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"TRI-LINE BUILDERS","c":9650000.0,"abc":9650000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-11-15","lat":18.05906,"lon":120.52068,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Cayubog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":622},{"i":771,"cid":"23A00067","pid":"P00725597LZ","t":"Construction ofFlood Control Structure along Quiaoit River (Upstream of Nalasin Bridge) Barangay Nalasin, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":48249956.06,"abc":48250000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-10-14","lat":18.0642,"lon":120.521,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.08,"wp":[18.06441,120.52176],"wst":"matched","br":"Nalasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":623},{"i":772,"cid":"24PE0054","pid":"P00824846LZ","t":"Construction of Flood Mitigation Structure along Aringay River Basin, Main Stream (Kagaling River Section), Tuba, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"TUBA (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":84877709.32,"abc":84920000.0,"fy":"2024","sd":"06/03/2024","cd":"2025-03-02","lat":16.422904,"lon":120.52103,"sm":1587,"fm":1587,"tm":1587,"am":1587,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.27,"wp":[16.42457,120.51913],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":624},{"i":773,"cid":"24AD0047","pid":"P00844716LZ","t":"Construction of Burgos Flood Control, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":14699536.4,"abc":14700000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-06-28","lat":17.29412,"lon":120.52119,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":625},{"i":774,"cid":"23AI0088","pid":"P00742280LZ","t":"Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE)","c":19741064.12,"abc":19600000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-02-10","lat":15.960508,"lon":120.521216,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Labit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Labit West Zone 1","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.39,"value":1.0072,"text":"Contract cost is 0.72% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":948},{"i":775,"cid":"22PE0004","pid":"P00621002LZ","t":"Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Kagaling) and Section 10 (Hydro No. 2), Tuba, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"TUBA (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"J-NINE-INFINITY BUILDERS AND SUPPLIES","c":12523558.95,"abc":12740000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-10-18","lat":16.417663,"lon":120.521522,"sm":1587,"fm":1587,"tm":1587,"am":1587,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.8,"wp":[16.42412,120.5182],"wst":"matched","br":null,"len":null,"ph":"Section 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":626},{"i":776,"cid":"22CH0039","pid":"P00631250LZ","t":"Construction of Slope Protection Structure along Porac River, Brgy. Hacienda Dolores, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":48991419.29,"abc":48996511.82,"fy":"2022","sd":"03/21/2022","cd":"2022-10-16","lat":15.097666,"lon":120.521722,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.0,"wp":[15.09767,120.52172],"wst":"matched","br":"Hacienda Dolores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":627},{"i":777,"cid":"23AB0146","pid":"P00726851LZ","t":"Construction of Flood Control Structure along Quiaoit River, Brgy. Pannaratan & Brgy. Surgui, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":9650000.0,"abc":9650000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-10-12","lat":18.06449,"lon":120.52235,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.0,"wp":[18.0645,120.52235],"wst":"matched","br":"Pannaratan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":628},{"i":778,"cid":"23AD0023","pid":"P00736179LZ","t":"Construction of Gayaman Flood Control, Sugpon, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SUGPON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":28518079.07,"abc":29334000.07,"fy":"2023","sd":"02/10/2023","cd":"2024-05-28","lat":16.846128,"lon":120.52258,"sm":1486,"fm":1486,"tm":1486,"am":1486,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":629},{"i":779,"cid":"22CH0013","pid":"P00631251LZ","t":"Construction of Slope Protection Structure at Brgy. Manuali, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"MBDIWA CONSTRUCTION AND SUPPLY","c":29382358.72,"abc":29399306.27,"fy":"2022","sd":"02/21/2022","cd":"2022-07-12","lat":15.143947,"lon":120.522804,"sm":1164,"fm":1164,"tm":1164,"am":61,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manuali","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":630},{"i":780,"cid":"24CK0042","pid":"P00821300LZ","t":"Rehabilitation of Existing Dike along O' Donnell River, Upstream of Palublub Bridge, Right Bank (Package A), Sta. 0+000 to Sta. 0+535.20, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":86844861.33,"abc":86849798.48,"fy":"2024","sd":"02/20/2024","cd":"2024-08-21","lat":15.40483,"lon":120.5232,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O' Donnell","wn":"O' Donnel River","wd":0.07,"wp":[15.40542,120.52306],"wst":"matched","br":null,"len":535.2,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":631},{"i":781,"cid":"23A00081","pid":"P00726371LZ","t":"Construction of Flood Control Structure along Quiaoit River (Upstream of Barsa Bridge), Sitio Barsa, barangay Nalasin, Paoay, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":106149992.4,"abc":106150000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-02-26","lat":18.071369,"lon":120.523492,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.68,"wp":[18.06545,120.52537],"wst":"matched","br":"Nalasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":632},{"i":782,"cid":"22CB0047","pid":"P00620514LZ","t":"Construction of Flood Control Structure, along Tenejero Creek, Tenejero-Camacho Section, Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"L.R. DE GUZMAN CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-08-11","lat":14.680763,"lon":120.525044,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Tenejero","wn":"Tenejero Creek","wd":0.01,"wp":[14.68077,120.52492],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":633},{"i":783,"cid":"23CA0028","pid":"P00727121LZ","t":"Construction of Flood Control Structure along Capitangan River (Phase II-AA), Abucay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48999989.27,"abc":48999997.78,"fy":"2023","sd":"03/13/2023","cd":"2023-10-13","lat":14.705941,"lon":120.525727,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":"Capitangan","wn":"Capitangan River","wd":32.87,"wp":[14.86668,120.78233],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":634},{"i":784,"cid":"24CB0071","pid":"P00823487LZ","t":"Construction of Flood Control Structure along Tenejero River (Camacho-Tenejero Bridge), Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"POLYMER-VIC CONSTRUCTION","c":6695351.42,"abc":6860000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-07-26","lat":14.681267,"lon":120.526033,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Tenejero","wn":"Tenejero Creek","wd":0.01,"wp":[14.68126,120.52609],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":635},{"i":785,"cid":"22CA0081","pid":"P00621494LZ","t":"Construction of Flood Control Project in Curing River, Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48509999.16,"abc":48509999.16,"fy":"2022","sd":"08/11/2022","cd":"2023-09-14","lat":14.810744,"lon":120.526072,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Curing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":636},{"i":786,"cid":"24CB0065","pid":"P00823485LZ","t":"Construction of Flood Control Structure along Tenejero River , Barangay Tenejero, Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":31845000.0,"abc":32340000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-07-22","lat":14.681097,"lon":120.527433,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Tenejero","wn":"Tenejero Creek","wd":0.01,"wp":[14.68104,120.52739],"wst":"matched","br":"Tenejero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":637},{"i":787,"cid":"23A00291","pid":"P00740304LZ","t":"Construction of Flood Control Structure, Barangay Dinaratan, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":57899804.66,"abc":57900000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-12-04","lat":17.1259,"lon":120.52755,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dinaratan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":638},{"i":788,"cid":"22CH0041","pid":"P00621454LZ","t":"Construction of Slope Protection along Porac River, Ascomo-Pulungmasle, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":48843246.67,"abc":48852943.86,"fy":"2022","sd":"04/13/2022","cd":"2022-10-09","lat":15.012451,"lon":120.527551,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.07,"wp":[15.01208,120.52701],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":639},{"i":789,"cid":"22CA0046","pid":"P00631171LZ","t":"Construction of Flood Control Structure along San Juan River, Sitio Pugad Lawin, Barangay San Juan, Phase 1A - CDA, Samal, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"SAMAL (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48999999.81,"abc":48999999.81,"fy":"2022","sd":"02/21/2022","cd":"2022-10-30","lat":14.774759,"lon":120.527723,"sm":1246,"fm":1246,"tm":1246,"am":1246,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan Creek","wd":39.34,"wp":[14.92265,120.1956],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":640},{"i":790,"cid":"24CA0006","pid":"P00820803LZ","t":"Construction of Flood Control Structure along Orani River (Phase III), Orani, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":47039999.94,"abc":47039999.94,"fy":"2024","sd":"02/16/2024","cd":"2024-08-05","lat":14.791692,"lon":120.528397,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Orani","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":641},{"i":791,"cid":"24CA0080","pid":"P00839571LZ","t":"Construction of Dike in Barangay Laon, Abucay, Bataan","w":"Construction of Dike","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"JEPA CONSTRUCTION & SUPPLIES","c":4949999.6,"abc":4949999.6,"fy":"2024","sd":"07/09/2024","cd":"2024-09-30","lat":14.724523,"lon":120.528399,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Laon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":642},{"i":792,"cid":"23A00086","pid":"P00725598LZ","t":"Construction of Flood Control Structure along Badoc River Barangay Balbaldez, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":48249994.28,"abc":48250000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-06-30","lat":17.91778,"lon":120.52863,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.08,"wp":[17.91847,120.52855],"wst":"matched","br":"Balbaldez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":643},{"i":793,"cid":"24CJ0065","pid":"P00820866LZ","t":"Construction of Slope Protection Structure along Tarlac River (Left Dike), Brillante-Aduas (Package M), Paniqui, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":49500000.0,"abc":49000000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-06-19","lat":15.643419,"lon":120.528658,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.92,"wp":[15.64033,120.53663],"wst":"matched","br":null,"len":null,"ph":"Package M","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":703},{"i":794,"cid":"24CJ0063","pid":"P00820865LZ","t":"Construction of Slope Protection Structure along Tarlac River (Left Dike), Brillante-Aduas (Package L), Paniqui, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"BIG BERTHA CONSTRUCTION & DEVELOPMENT","c":49500000.0,"abc":49000000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-09-19","lat":15.641886,"lon":120.528686,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.86,"wp":[15.63905,120.5361],"wst":"matched","br":null,"len":null,"ph":"Package L","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":704},{"i":795,"cid":"23CH0064","pid":"P00740608LZ","t":"Construction of Slope Protection along Barangay San Antonio, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":48994727.99,"abc":48999144.61,"fy":"2023","sd":"05/08/2023","cd":"2023-10-04","lat":14.96636,"lon":120.52915,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":644},{"i":796,"cid":"24CJ0007","pid":"P00820261LZ","t":"Construction of Slope Protection Structure along Tarlac River (Left Dike), Brillante-Aduas Section, Package J, Paniqui, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"J.H.R. ENTERPRISES","c":74250000.0,"abc":72375000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":15.639142,"lon":120.529678,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.66,"wp":[15.6373,120.53552],"wst":"matched","br":null,"len":null,"ph":"Package J","dup":[],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":539},{"i":797,"cid":"23CA0052","pid":"P00742313LZ","t":"Construction of Flood Control Project along Orani River, Orani, Bataan (Phase III-A1)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":9899999.99,"abc":9899999.99,"fy":"2023","sd":"07/24/2023","cd":"2023-10-23","lat":14.79168,"lon":120.53042,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Orani","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":645},{"i":798,"cid":"21AD0048","pid":"P00561479LZ","t":"Construction of Atabay River Control, Barangay Atabay, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"Salcedo","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19599899.56,"abc":19800000.0,"fy":"2021","sd":"10/11/2021","cd":"2022-08-31","lat":17.134378,"lon":120.530451,"sm":1240,"fm":null,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":"Atabay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Atabay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":646},{"i":799,"cid":"24CB0039","pid":"P00820221LZ","t":"Construction of Flood Control Structure along Talisay River (9+385-9+810), Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":67550000.0,"abc":67550000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-09-13","lat":14.642692,"lon":120.530567,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.15,"wp":[14.64266,120.532],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1133,1145,1198],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CB0036 to 24CB0039) cover the same site, together worth PHP 214,550,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":403},{"i":800,"cid":"22AH0068","pid":"P00631089LZ","t":"Construction of Riverbank Protection along Barangay Calmay, Dagupan City, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":48996222.71,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-05-29","lat":16.045842,"lon":120.328789,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calmay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":647},{"i":801,"cid":"23A00244","pid":"P00726340LZ","t":"Construction of Flood Control Structure along Bauang River, Downstream of Bauang Bridge 1, Brgys. Parian Este - Nagrebcan, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":77199690.44,"abc":78400000.0,"fy":"2023","sd":"03/03/2023","cd":"2024-04-01","lat":16.519011,"lon":120.329084,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":648},{"i":802,"cid":"23AJ0023","pid":"P00726076LZ","t":"Construction of Slope Protection Works along San Juan River, San Juan Section, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":19599856.12,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-11","lat":15.91548,"lon":120.33046,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.04,"wp":[15.9155,120.33009],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":649},{"i":803,"cid":"24AF0093","pid":"P00820712LZ","t":"Construction of Damaged Shore Protection Works (Groins), Barangay Bagbag, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":28938082.84,"abc":28949995.25,"fy":"2024","sd":"04/16/2024","cd":"2024-09-23","lat":16.467769,"lon":120.330837,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":650},{"i":804,"cid":"24AF0108","pid":"P00824810LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 1), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89737118.14,"abc":89744999.16,"fy":"2024","sd":"04/16/2024","cd":"2025-01-06","lat":16.519094,"lon":120.33135,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[825,843,860,871,810,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":310},{"i":805,"cid":"24AF0094","pid":"P00838336LZ","t":"Construction of Shore Protection Works, Barangay Urayong, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96493843.08,"abc":96499998.37,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.459076,"lon":120.331704,"sm":188,"fm":188,"tm":188,"am":270,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Urayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":651},{"i":806,"cid":"23AJ0039","pid":"P00726087LZ","t":"Construction of Slope Protection Works along Baldakit Creek, barangay Manzon-Cacaritan-Pagal, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"LEZA  CONSTRUCTION & SUPPLY","c":19136072.38,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-06-20","lat":15.949959,"lon":120.33218,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Baldakit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Manzon-Cacaritan-Pagal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":652},{"i":807,"cid":"23AJ0024","pid":"P00726077LZ","t":"Construction of Slope Protection Works along San Juan River, Tebag, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BALLESTEROS CONSTRUCTION AND SUPPLY","c":19370189.68,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-04-17","lat":15.899147,"lon":120.332955,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.48,"wp":[15.90322,120.33451],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":653},{"i":808,"cid":"22AF0005","pid":"P00620950LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+540, Brgys, Calumbaya and Boy-utan, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":44202866.82,"abc":45569965.75,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":16.51662,"lon":120.33355,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":540.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":654},{"i":809,"cid":"24AF0054","pid":"P00824802LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Sto. Rosario West, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96479841.9,"abc":96499995.82,"fy":"2024","sd":"03/08/2024","cd":"2025-01-20","lat":16.388885,"lon":120.333738,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.16,"wp":[16.39033,120.33407],"wst":"matched","br":"Sto. Rosario West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":655},{"i":810,"cid":"24AF0113","pid":"P00824821LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 6), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89737362.73,"abc":89744994.56,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.516406,"lon":120.335475,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 6","dup":[],"run":[804,825,843,860,871,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":311},{"i":811,"cid":"24AF0057","pid":"P00824801LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Samara, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96492336.54,"abc":96499999.35,"fy":"2024","sd":"03/08/2024","cd":"2024-09-23","lat":16.388063,"lon":120.336763,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.18,"wp":[16.38967,120.33714],"wst":"matched","br":"Samara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":656},{"i":812,"cid":"22AF0003","pid":"P00631074LZ","t":"Construction of Flood Control Mitigation Structures Along Bauang River Basin, Brgy. Acao, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":33522947.4,"abc":34299997.97,"fy":"2022","sd":"02/16/2022","cd":"2022-08-15","lat":16.51937,"lon":120.33682,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Acao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":657},{"i":813,"cid":"22A00305","pid":"P00637752LZ","t":"Construction Of Riverbank Protection along Barangay Pogo Grande-Barangay Lasip Grande, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":69299993.18,"abc":69300000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-02-27","lat":16.0346,"lon":120.33787,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pogo Grande-Barangay Lasip Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":658},{"i":814,"cid":"23A00245","pid":"P00726339LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Sta Lucia, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":77199423.32,"abc":78400000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-06-07","lat":16.39493,"lon":120.337939,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.59,"wp":[16.38976,120.33674],"wst":"matched","br":"Sta Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":659},{"i":815,"cid":"24AF0101","pid":"P00821476LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Acao, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"PANGASINAN NEW WILSON LUMBER & CONSTRUCTION SUPPLY","c":28946444.57,"abc":28949999.89,"fy":"2024","sd":"06/19/2024","cd":"2025-03-16","lat":16.518327,"lon":120.33804,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Acao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":660},{"i":816,"cid":"23AJ0017","pid":"P00726073LZ","t":"Construction of Slope Protection Works along San Juan River, Mestizo Norte Section, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"2-R CONSTRUCTION SUPPLY","c":19599753.41,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-15","lat":15.9092,"lon":120.3382,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.73,"wp":[15.90278,120.33669],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":661},{"i":817,"cid":"22AE0060","pid":"P00621444LZ","t":"Construction of Taboc Seawall, Barangay Taboc, San Juan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S","c":29399459.28,"abc":29399785.9,"fy":"2022","sd":"03/28/2022","cd":"2022-10-15","lat":16.690477,"lon":120.338241,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Taboc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":662},{"i":818,"cid":"23AJ0054","pid":"P00726097LZ","t":"Construction of Slope Protection Works along Ingalera River, Macabito Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":19599732.5,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-06-26","lat":15.95469,"lon":120.33877,"sm":297,"fm":297,"tm":297,"am":1261,"md":1.53,"ls":"adjacent","ww":"Ingalera","wn":"Ingalera River","wd":8.17,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":663},{"i":819,"cid":"24A00293","pid":"P00824832LZ","t":"Construction of Riverbank Protection along Sinucalan River, Brgy. Lasip Chico, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-07-31","lat":16.023962,"lon":120.338778,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":5.16,"wp":[16.00119,120.38077],"wst":"matched","br":"Lasip Chico","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":664},{"i":820,"cid":"22AF0006","pid":"P00631078LZ","t":"Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays Balawarte, San Julian West And San Julian Norte, Agoo, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"BERSON'S CONSTRUCTION & TRADING","c":44100000.0,"abc":44099995.78,"fy":"2022","sd":"02/22/2022","cd":"2022-08-01","lat":16.30897,"lon":120.33984,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balawarte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":665},{"i":821,"cid":"22AE0059","pid":"P00620941LZ","t":"Construction of San Juan Waterways, Barangay Ili Norte-Talogtog, San Juan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S","c":19085370.2,"abc":19086476.65,"fy":"2022","sd":"02/14/2022","cd":"2022-07-22","lat":16.679605,"lon":120.340548,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ili Norte-Talogtog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":666},{"i":822,"cid":"22AF0056","pid":"P00640500LZ","t":"Construction of Slope Protection, Barangay Sta. Lucia, Aringay, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"KRYPTONITE 6S BUILDERS INC.","c":4898251.25,"abc":4949997.63,"fy":"2022","sd":"07/08/2022","cd":"2022-08-15","lat":16.396245,"lon":120.340897,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":667},{"i":823,"cid":"22AF0011","pid":"P00631079LZ","t":"Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays San Nicolas West and San Isidro, Agoo, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"BONIMAR CONSTRUCTION ENTERPRISES","c":42721838.4,"abc":44099999.53,"fy":"2022","sd":"02/24/2022","cd":"2022-08-15","lat":16.30446,"lon":120.34111,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":668},{"i":824,"cid":"24A00438","pid":"P00824803LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Samara-Sta.Lucia, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":144739151.6,"abc":144750000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-09-02","lat":16.394478,"lon":120.34174,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.59,"wp":[16.38913,120.34135],"wst":"matched","br":"Samara-Sta.Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":669},{"i":825,"cid":"24AF0109","pid":"P00824813LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 2), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89737280.52,"abc":89744995.99,"fy":"2024","sd":"04/16/2024","cd":"2025-01-06","lat":16.518783,"lon":120.342058,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[804,843,860,871,810,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":312},{"i":826,"cid":"24AF0139","pid":"P00824840LZ","t":"Construction of Flood Control Structures along Aringay River Basin, Brgy. Sta. Lucia, Aringay, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"KRYPTONITE 6S BUILDERS INC.","c":19224221.54,"abc":19299998.47,"fy":"2024","sd":"05/08/2024","cd":"2025-03-16","lat":16.3981,"lon":120.3422,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":1.0,"wp":[16.38912,120.34154],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":670},{"i":827,"cid":"24A00167","pid":"P00820710LZ","t":"Construction of Flood Control Structure, Barangay Langcuas, San Fernando City, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":38599971.35,"abc":38600000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-11-15","lat":16.614697,"lon":120.342305,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Langcuas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":671},{"i":828,"cid":"22AH0133","pid":"P00639431LZ","t":"Construction of Drainage Structure at Brgy. Bonuan Gueset, Dagupan City, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"ZOTA TRADING & CONSTRUCTION","c":4898112.71,"abc":4900000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-08-19","lat":16.076458,"lon":120.342597,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonuan Gueset","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":672},{"i":829,"cid":"22AJ0038","pid":"P00632747LZ","t":"Construction of Box Culvert, Barangay Bacnar, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":4949968.24,"abc":4950000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-30","lat":15.873849,"lon":120.34268,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bacnar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":673},{"i":830,"cid":"21AF0030","pid":"P00525547LZ","t":"Construction of Flood Control Structures along Principe River, Brgy.San Vicente Sur, San Vicente Norte and Sta. Rita Sur, Agoo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"Agoo","deo":"La Union 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":66702855.9,"abc":67549999.97,"fy":"2021","sd":"11/15/2021","cd":"2022-10-24","lat":16.343036,"lon":120.344123,"sm":10,"fm":null,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":674},{"i":831,"cid":"23AJ0028","pid":"P00726078LZ","t":"Construction of Slope Protection Works along San Juan River, Bacnar, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19599122.42,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-06-08","lat":15.877561,"lon":120.344124,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":2.77,"wp":[15.90197,120.33855],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":675},{"i":832,"cid":"23AJ0018","pid":"P00726074LZ","t":"Construction of Slope Protection Works along San Juan River, Bolosan Section, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"5J AND G CONSTRUCTION AND SUPPLY","c":19599638.68,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-29","lat":15.90459,"lon":120.34418,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.67,"wp":[15.90197,120.33855],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":676},{"i":833,"cid":"22AF0017","pid":"P00631080LZ","t":"Rehabilitation of Damaged Shore Protection Works, Brgys. San Manuel Norte and San Manuel Sur, Agoo, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":9554879.78,"abc":9799986.57,"fy":"2022","sd":"02/22/2022","cd":"2022-08-15","lat":16.363641,"lon":120.344451,"sm":10,"fm":10,"tm":10,"am":73,"md":0.36,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":677},{"i":834,"cid":"23EB0044","pid":"P00737550LZ","t":"Construction of Flood Control Structure, Barangay Bulacan, Looc, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"LOOC (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":9798295.61,"abc":9800000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-26","lat":13.67057,"lon":120.34498,"sm":805,"fm":805,"tm":805,"am":805,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":678},{"i":835,"cid":"22AH0057","pid":"P00620458LZ","t":"Construction of Riverbank Protection Structure along Sinocalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":47539279.87,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-16","lat":16.029461,"lon":120.344981,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":"Sinocalan","wn":"Sinocalan River","wd":4.95,"wp":[16.00119,120.38077],"wst":"matched","br":"Bacayao Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":679},{"i":836,"cid":"23AH0028","pid":"P00726842LZ","t":"Construction of Riverbank Protection, Barangay Takipan, Mangatarem, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGATAREM (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING","c":96446398.75,"abc":96500000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-05-03","lat":15.73249,"lon":120.3454,"sm":917,"fm":917,"tm":917,"am":917,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Takipan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":680},{"i":837,"cid":"23A00090","pid":"P00725617LZ","t":"Construction of Seawall Cabittaogan, Sta. Catalina, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CATALINA (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"APP CONSTRUCTION AND SUPPLIES / A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":53074634.39,"abc":53075000.0,"fy":"2023","sd":"10/02/2023","cd":"2024-10-02","lat":17.5693,"lon":120.34545,"sm":1372,"fm":1372,"tm":1372,"am":1372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":681},{"i":838,"cid":"22A00031","pid":"P00620797LZ","t":"Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CATALINA (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":241249984.4,"abc":241250000.0,"fy":"2022","sd":"03/04/2022","cd":"2023-01-06","lat":17.585938,"lon":120.34583,"sm":1372,"fm":1372,"tm":null,"am":1372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":682},{"i":839,"cid":"23AH0072","pid":"P00727090LZ","t":"Construction of Riverbank Protection Sinucalan River, Brgy. Lasip Grande, Dagupan City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"DAGUPAN CITY (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":48995165.49,"abc":49000000.0,"fy":"2023","sd":"05/24/2023","cd":"2023-11-24","lat":16.02714,"lon":120.3465,"sm":475,"fm":475,"tm":475,"am":475,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":4.66,"wp":[16.00119,120.38077],"wst":"matched","br":"Lasip Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":683},{"i":840,"cid":"24AF0114","pid":"P00824823LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 7), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89737260.38,"abc":89744998.48,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.518456,"lon":120.347036,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 7","dup":[],"run":[804,825,843,860,871,810],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":313},{"i":841,"cid":"23A00109","pid":"P00726840LZ","t":"Construction of Flood Control Structure along Paratong-Subec, Cabittaogan Creek, Sta. Catalina, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CATALINA (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / LEZA  CONSTRUCTION & SUPPLY","c":77199817.11,"abc":77200000.0,"fy":"2023","sd":"10/02/2023","cd":"2024-11-30","lat":17.58591,"lon":120.34705,"sm":1372,"fm":1372,"tm":1372,"am":1372,"md":0.0,"ls":"inside","ww":"Cabittaogan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":684},{"i":842,"cid":"21AC0011","pid":"P00525864LZ","t":"Construction of Flood Control, Paratong-Subec Creek, Brgy. Paratong-Subec, Sta. Catalina, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"Santa Catalina","deo":"Ilocos Sur 1st District Engineering Office","co":"LEZA  CONSTRUCTION & SUPPLY","c":24500000.0,"abc":24500000.0,"fy":"2021","sd":"02/24/2022","cd":"2022-12-28","lat":17.58591,"lon":120.347067,"sm":1372,"fm":null,"tm":1372,"am":1372,"md":0.0,"ls":"inside","ww":"Paratong-Subec","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Paratong-Subec","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":685},{"i":843,"cid":"24AF0110","pid":"P00824815LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 3), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89736907.75,"abc":89744999.91,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.520656,"lon":120.348475,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[804,825,860,871,810,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":314},{"i":844,"cid":"24AF0103","pid":"P00843188LZ","t":"Construction of Flood Control Structure Barangay Poblacion Sur, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48244241.98,"abc":48249999.19,"fy":"2024","sd":"04/03/2024","cd":"2024-10-21","lat":16.428131,"lon":120.348839,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":686},{"i":845,"cid":"23A00091","pid":"P00725618LZ","t":"Construction of Seawall Tamorong, Sta. Catalina, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CATALINA (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"APP CONSTRUCTION AND SUPPLIES / A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":51458957.34,"abc":53075000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-11-27","lat":17.600833,"lon":120.348889,"sm":1372,"fm":1372,"tm":1372,"am":1372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":687},{"i":846,"cid":"23AJ0059","pid":"P00726095LZ","t":"Construction of Slope Protection Works along Ingalera River, barangay Dinalaoan, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MANIMELDS CONSTRUCTION & IRON WORKS","c":19019455.46,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-18","lat":16.002062,"lon":120.34901,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":9.81,"wp":[15.93892,120.41332],"wst":"matched","br":"Dinalaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":688},{"i":847,"cid":"24A00276","pid":"P00824806LZ","t":"Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BACNOTAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":154399996.7,"abc":154400000.0,"fy":"2024","sd":"06/14/2024","cd":"2024-11-05","lat":16.705345,"lon":120.349032,"sm":91,"fm":91,"tm":91,"am":91,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.08,"wp":[16.70498,120.34838],"wst":"matched","br":"Bacsil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":689},{"i":848,"cid":"23A00123","pid":"P00735958LZ","t":"Construction of Flood Control Structure along Caba River, Barangay Las-Ud - Poblacion Sur - Gana, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":115799320.9,"abc":115800000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-05-31","lat":16.428321,"lon":120.349072,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":"Caba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Las-Ud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":690},{"i":849,"cid":"23AJ0002","pid":"P00726059LZ","t":"Construction of Slope Protection Works along Ingalera River, Brgy. Dinalaoan, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":47992273.56,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-07-17","lat":16.005956,"lon":120.349173,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":10.11,"wp":[15.93892,120.41332],"wst":"matched","br":"Dinalaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":691},{"i":850,"cid":"23AJ0063","pid":"P00737428LZ","t":"Construction of Slope Protection (Phase I) at Barangay Dinalaoan, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BALLESTEROS CONSTRUCTION AND SUPPLY","c":9608748.04,"abc":9900000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-25","lat":16.000945,"lon":120.349492,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dinalaoan","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":692},{"i":851,"cid":"23AJ0057","pid":"P00726093LZ","t":"Construction of Slope Protection Works along Marusay River, Lasip Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19369726.57,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-13","lat":16.005358,"lon":120.349627,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Marusay","wn":"Marusay River","wd":3.01,"wp":[15.98136,120.36292],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.01,"text":"The title names Marusay, which OpenStreetMap maps through the stated municipality, but the pin is 3.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":422},{"i":852,"cid":"24AF0040","pid":"P00844720LZ","t":"Construction of Flood Control Structure, Barangay Gana, Caba, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CABA (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48995000.0,"abc":48999993.44,"fy":"2024","sd":"02/16/2024","cd":"2025-02-16","lat":16.429326,"lon":120.350509,"sm":270,"fm":270,"tm":270,"am":270,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":693},{"i":853,"cid":"23AE0039","pid":"P00740568LZ","t":"Construction of Flood Mitigating Structure, Purok 5, Namtutan, City of San Fernando, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"RAPHAEIL CONSTRUCTION","c":4899991.63,"abc":4899998.98,"fy":"2023","sd":"03/27/2023","cd":"2023-05-24","lat":16.625641,"lon":120.350775,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":694},{"i":854,"cid":"23A00382","pid":"P00742115LZ","t":"Construction of Bato Creek Slope Protection, City of San Fernando, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":98996959.56,"abc":99000000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-04-30","lat":16.64016,"lon":120.350903,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":"Bato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":695},{"i":855,"cid":"23AJ0051","pid":"P00726096LZ","t":"Construction of Slope Protection Works along Ingalera River, Lumbang Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":47554595.06,"abc":49000000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-08-11","lat":15.985903,"lon":120.351865,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":8.39,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":696},{"i":856,"cid":"23AF0043","pid":"P00727086LZ","t":"Construction of Shore Protection Works, barangay Cabaruan, Sto. Tomas, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SANTO TOMAS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION / BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION)","c":48754908.74,"abc":48999971.73,"fy":"2023","sd":"02/23/2023","cd":"2024-02-11","lat":16.276119,"lon":120.353652,"sm":1415,"fm":1415,"tm":1415,"am":1415,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":697},{"i":857,"cid":"23AJ0058","pid":"P00726094LZ","t":"Construction of Slope Protection Works along Ingalera River, Mancup Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19589753.85,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-07-17","lat":15.99477,"lon":120.35373,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":8.89,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":698},{"i":858,"cid":"24AF0095","pid":"P00821101LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96492001.36,"abc":96499994.18,"fy":"2024","sd":"04/16/2024","cd":"2025-02-16","lat":16.518222,"lon":120.353761,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[935,921],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AF0095 to 24AF0097) cover the same site, together worth PHP 289,384,525.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":238},{"i":859,"cid":"21CJ0074","pid":"P00561142LZ","t":"Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 4)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"San Jose","deo":"Tarlac District Engineering Office","co":"R-II BUILDERS, INC.","c":56776877.63,"abc":67550000.0,"fy":"2021","sd":"03/30/2022","cd":"2022-11-27","lat":15.508167,"lon":120.35458,"sm":1298,"fm":null,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":699},{"i":860,"cid":"24AF0111","pid":"P00824817LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 4), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89736445.72,"abc":89744997.81,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.519056,"lon":120.354714,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[804,825,843,871,810,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":315},{"i":861,"cid":"21CJ0073","pid":"P00561141LZ","t":"Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 3)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"San Jose","deo":"Tarlac District Engineering Office","co":"R-II BUILDERS, INC.","c":64172013.74,"abc":67550000.0,"fy":"2021","sd":"03/30/2022","cd":"2022-09-25","lat":15.508142,"lon":120.355153,"sm":1298,"fm":null,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":700},{"i":862,"cid":"24AJ0096","pid":"P00845917LZ","t":"Rehabilitation Flood Control Structures along Caba Creek, Brgy. Ilang, San Carlos City, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":9899873.79,"abc":54450000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-09-11","lat":15.917,"lon":120.356,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Caba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ilang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":701},{"i":863,"cid":"23AF0100","pid":"P00727233LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72334509.64,"abc":72374998.02,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.391459,"lon":120.356302,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.1,"wp":[16.39061,120.35615],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[867,873,886,895,501,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":385},{"i":864,"cid":"23AE0013","pid":"P00726638LZ","t":"Rehabilitation of Baroro River Control, barangay Sta. Rosa, San Juan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":48998880.4,"abc":48999975.9,"fy":"2023","sd":"02/14/2023","cd":"2023-08-30","lat":16.68483,"lon":120.356774,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.06,"wp":[16.6846,120.35626],"wst":"matched","br":"Sta. Rosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":702},{"i":865,"cid":"23AJ0040","pid":"P00726084LZ","t":"Construction of Slope Protection Works along Caba Creek, barangay Ilang, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"LEZA  CONSTRUCTION & SUPPLY","c":19031663.71,"abc":19600000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-12-15","lat":15.918838,"lon":120.357613,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Caba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ilang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":703},{"i":866,"cid":"24AC0009","pid":"P00839546LZ","t":"Construction of Seawall, Sto. Domingo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTO DOMINGO (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":4920631.39,"abc":4950000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-05-03","lat":17.645135,"lon":120.358749,"sm":1409,"fm":1409,"tm":1409,"am":1409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":704},{"i":867,"cid":"23AF0101","pid":"P00727234LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72334339.31,"abc":72374992.09,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.39133,"lon":120.359763,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.14,"wp":[16.39005,120.35949],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[863,873,886,895,501,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":386},{"i":868,"cid":"22CJ0157","pid":"P00637030LZ","t":"Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 6), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":93815457.98,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-25","lat":15.504031,"lon":120.360219,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":705},{"i":869,"cid":"22CJ0180","pid":"P00637031LZ","t":"Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 7), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":94473488.06,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-25","lat":15.503603,"lon":120.360661,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":706},{"i":870,"cid":"22CJ0199","pid":"P00639353LZ","t":"Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package F), San Jose, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"THREE W BUILDERS, INC.","c":94270850.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-25","lat":15.503604,"lon":120.360679,"sm":1298,"fm":1298,"tm":1298,"am":1298,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package F","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":707},{"i":871,"cid":"24AF0112","pid":"P00824819LZ","t":"Construction of Flood Control structure along Bauang River Basin (Package 5), Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":89736347.57,"abc":89744999.98,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.516203,"lon":120.360733,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[804,825,843,860,810,840],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (24AF0108 to 24AF0114) cover the same site, together worth PHP 628,158,723.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":316},{"i":872,"cid":"23AJ0003","pid":"P00726062LZ","t":"Construction of Slope Protection Works along Marusay River, Poblacion East, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":19599931.81,"abc":19600000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-07-17","lat":16.008119,"lon":120.361376,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Marusay","wn":"Marusay River","wd":2.95,"wp":[15.98159,120.36346],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":26,"text":"A PHP 19,599,932 contract recorded as completed 26 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":705},{"i":873,"cid":"23AF0102","pid":"P00727235LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72334295.99,"abc":72374999.04,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.390257,"lon":120.36233,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.08,"wp":[16.38952,120.36218],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[863,867,886,895,501,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":387},{"i":874,"cid":"22A00078","pid":"P00620782LZ","t":"Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase I)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":129562772.0,"abc":129562830.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-04","lat":16.023588,"lon":120.363127,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Parongking","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ambonao","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":708},{"i":875,"cid":"22AE0023","pid":"P00620948LZ","t":"Rehabilitation of Baroro River Control, Brgy. Dangdangla, San Juan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":48020000.0,"abc":48019927.13,"fy":"2022","sd":"02/11/2022","cd":"2022-07-28","lat":16.683286,"lon":120.363499,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.09,"wp":[16.68247,120.36357],"wst":"matched","br":"Dangdangla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":709},{"i":876,"cid":"23AJ0004","pid":"P00726064LZ","t":"Construction of Slope Protection Works along Ingalera River, Malabago, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":9799989.13,"abc":9800000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-05-31","lat":15.981701,"lon":120.363593,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":7.13,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":710},{"i":877,"cid":"23AE0034","pid":"P00742274LZ","t":"Construction of Slope Protection, Barangay Bacsil, City of San Fernando, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"La Union 1st District Engineering Office","co":"FABRO CONSTRUCTION","c":4949512.1,"abc":4949992.07,"fy":"2023","sd":"03/30/2023","cd":"2023-09-22","lat":16.618659,"lon":120.364145,"sm":414,"fm":414,"tm":414,"am":414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bacsil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":711},{"i":878,"cid":"22A00079","pid":"P00620783LZ","t":"Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":128344991.7,"abc":128345000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-01-07","lat":16.01869,"lon":120.364366,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Parongking","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ambonao","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":712},{"i":879,"cid":"24AF0195","pid":"P00821103LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Sto Tomas, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SANTO TOMAS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":96494448.46,"abc":96499998.98,"fy":"2024","sd":"12/24/2024","cd":"2025-03-16","lat":16.512147,"lon":120.365269,"sm":1415,"fm":1415,"tm":1415,"am":188,"md":23.55,"ls":"outside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.55,"text":"The pin is 23.6 km outside Santo Tomas, La Union, the nearest municipality the record claims. It falls in Bauang, La Union.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":109},{"i":880,"cid":"24A00277","pid":"P00824805LZ","t":"Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"BALINTUGAN CONSTRUCTION","c":154399997.4,"abc":154400000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-11","lat":16.67425,"lon":120.365815,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.03,"wp":[16.67451,120.36591],"wst":"matched","br":"Bambanay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":713},{"i":881,"cid":"23AJ0016","pid":"P00726072LZ","t":"Construction of Slope Protection Works along Ingalera River, barangay Inerangan, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19593200.89,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-10","lat":15.960363,"lon":120.366355,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":5.56,"wp":[15.93892,120.41332],"wst":"matched","br":"Inerangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":714},{"i":882,"cid":"22AF0004","pid":"P00631077LZ","t":"Construction of Shore Protection Works at Brgys. Sta. Rita Sur And Sta. Rita Central, Agoo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"BONIMAR CONSTRUCTION ENTERPRISES","c":42775317.09,"abc":44099991.15,"fy":"2022","sd":"02/18/2022","cd":"2022-08-15","lat":16.323087,"lon":120.366522,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[883],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 108,966,559.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":949},{"i":883,"cid":"22AF0028","pid":"P00630927LZ","t":"Construction of Flood Control Structures along Principe River, Brgys. Sta. Monica And Sta. Rita Sur, Agoo, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":66191241.77,"abc":67549999.23,"fy":"2022","sd":"04/04/2022","cd":"2023-05-15","lat":16.323087,"lon":120.366522,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[882],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 108,966,559.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":825},{"i":884,"cid":"23AE0012","pid":"P00726637LZ","t":"Rehabilitation of Baroro River Control, barangay Dangdangla, San Juan, La Union","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"MY BUILDERS AND CONSTRUCTION","c":48998252.87,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-24","lat":16.681514,"lon":120.366951,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":"Baroro","wn":"Baroro River","wd":0.19,"wp":[16.6808,120.36537],"wst":"matched","br":"Dangdangla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":715},{"i":885,"cid":"24AJ0097","pid":"P00825216LZ","t":"Construction of Flood Control Structure along Agno River, Caturay Section, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":9533434.84,"abc":39200000.0,"fy":"2024","sd":"05/06/2024","cd":"2024-08-05","lat":15.786,"lon":120.367,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.08,"wp":[15.78608,120.36629],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":716},{"i":886,"cid":"23AF0103","pid":"P00727236LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 4)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72334428.4,"abc":72374999.67,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.389579,"lon":120.367623,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.07,"wp":[16.38892,120.36769],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[863,867,873,895,501,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":388},{"i":887,"cid":"24AF0102","pid":"P00825211LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Cabalayangan, Bauang, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAUANG (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":48238274.49,"abc":48249993.13,"fy":"2024","sd":"03/19/2024","cd":"2024-12-23","lat":16.512074,"lon":120.367721,"sm":188,"fm":188,"tm":188,"am":188,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabalayangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":717},{"i":888,"cid":"23AJ0064","pid":"P00726060LZ","t":"Construction of Slope Protection Works along Ingalera River, Doyong Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BERSON'S CONSTRUCTION & TRADING","c":48999947.92,"abc":49000000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-11-29","lat":15.96668,"lon":120.368336,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":5.72,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":718},{"i":889,"cid":"23AE0061","pid":"P00742273LZ","t":"Construction of Flood Control Project, Brgy. Dangdangla, San Juan, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"SAN JUAN (LA UNION)","deo":"La Union 1st District Engineering Office","co":"FABRO CONSTRUCTION","c":9898955.58,"abc":9900000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-12-15","lat":16.680194,"lon":120.36854,"sm":1310,"fm":1310,"tm":1310,"am":1310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dangdangla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":719},{"i":890,"cid":"23AJ0014","pid":"P00726061LZ","t":"Construction of Slope Protection Works along Ingalera River, Songkoy Section, Calasiao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ORIENTAL SALES CENTER AND CONTRACTOR / ALCEL CONSTRUCTION","c":48999998.83,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-11-20","lat":15.957514,"lon":120.369113,"sm":297,"fm":297,"tm":297,"am":1261,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":5.16,"wp":[15.93892,120.41332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":720},{"i":891,"cid":"24AJ0049","pid":"P00844729LZ","t":"Construction of Slope Protection Structure along San Juan River Barangay Turac, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"EXTENSIVE STEEL WORKS AND CONSTRUCTION","c":19197354.75,"abc":19600000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-07-17","lat":15.895,"lon":120.37,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":3.46,"wp":[15.90197,120.33855],"wst":"matched","br":"Turac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.46,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 3.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":255},{"i":892,"cid":"23AJ0012","pid":"P00726071LZ","t":"Construction of Slope Protection Works along San Juan River, Barangay Turac, San Carlos City, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BALLESTEROS CONSTRUCTION AND SUPPLY","c":19212536.57,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-03-24","lat":15.895265,"lon":120.370431,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":3.5,"wp":[15.90197,120.33855],"wst":"matched","br":"Turac","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.5,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 3.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":423},{"i":893,"cid":"22AJ0062","pid":"P00621447LZ","t":"Construction of Slope Protection Works along San Juan River, Brgy. Turac, San Carlos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN CARLOS CITY (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BALLESTEROS CONSTRUCTION AND SUPPLY","c":19594702.35,"abc":19600000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-08","lat":15.895245,"lon":120.37045,"sm":1261,"fm":1261,"tm":1261,"am":1261,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":3.5,"wp":[15.90197,120.33855],"wst":"matched","br":"Turac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.5,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 3.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":410},{"i":894,"cid":"23A00268","pid":"P00726827LZ","t":"Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"AGOO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":72364531.35,"abc":72375000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-04-05","lat":16.327532,"lon":120.37064,"sm":10,"fm":10,"tm":10,"am":10,"md":0.0,"ls":"inside","ww":"Principe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":721},{"i":895,"cid":"23AF0104","pid":"P00727237LZ","t":"Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 5)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"ARINGAY (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":72334998.57,"abc":72374998.57,"fy":"2023","sd":"04/19/2023","cd":"2024-02-11","lat":16.390117,"lon":120.370719,"sm":73,"fm":73,"tm":73,"am":73,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.08,"wp":[16.38939,120.37084],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[863,867,873,886,501,504,118,123,117,108,109,107,116],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":14,"text":"14 contracts with consecutive numbers (23AF0100 to 23AF0113) cover the same site, together worth PHP 964,811,961.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":389},{"i":896,"cid":"23AC0053","pid":"P00727066LZ","t":"Construction of Flood Control along Bantaoay River, Barangay San Sebastian, San Vicente, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN VICENTE (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-07-17","lat":17.612065,"lon":120.37084,"sm":1361,"fm":1361,"tm":1361,"am":1361,"md":0.0,"ls":"inside","ww":"Bantaoay","wn":"Bantaoay River","wd":0.03,"wp":[17.61223,120.37107],"wst":"matched","br":"San Sebastian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":722},{"i":897,"cid":"22AC0014","pid":"P00620777LZ","t":"Construction of Flood Control along Bantaoay River, San Vicente, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN VICENTE (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION / FIT CONSTRUCTION","c":91675000.0,"abc":93100000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-15","lat":17.618784,"lon":120.371172,"sm":1361,"fm":1361,"tm":1361,"am":1361,"md":0.0,"ls":"inside","ww":"Bantaoay","wn":"Bantaoay River","wd":0.04,"wp":[17.61873,120.37081],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":723},{"i":898,"cid":"23CJ0048","pid":"P00735973LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation Along Batacan River, Pit-ao Section (Package C), Barangay Pit-ao, San Clemente, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"SAN CLEMENTE (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":70203757.24,"abc":72375000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-08","lat":15.736619,"lon":120.371742,"sm":1263,"fm":1263,"tm":1263,"am":1263,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Batacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pit-ao","len":null,"ph":"Package C","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":724},{"i":899,"cid":"24AJ0056","pid":"P00845920LZ","t":"Construction of Drainage, Brgy. Cabilocaan, Calasiao, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"CALASIAO (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":4815318.1,"abc":4950000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-03","lat":16.025,"lon":120.372,"sm":297,"fm":297,"tm":297,"am":297,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabilocaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":725},{"i":900,"cid":"22AD0046","pid":"P00632736LZ","t":"Construction of Butol Flood Control, Barangay Butol, Santiago, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTIAGO (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4899931.87,"abc":4900000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-27","lat":17.23675,"lon":120.42962,"sm":1407,"fm":1407,"tm":1407,"am":1407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Butol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":726},{"i":901,"cid":"22CA0045","pid":"P00631168LZ","t":"Construction of Flood Control Project along Colo River, San Benito Section, Phase VI-A, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":29399972.26,"abc":29399999.45,"fy":"2022","sd":"02/16/2022","cd":"2022-07-20","lat":14.844869,"lon":120.429683,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.84489,120.4299],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":727},{"i":902,"cid":"23A00235","pid":"P00726834LZ","t":"Construction of Flood Control Structure along Bued River, Brgy. Osiem, Mangaldan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANGALDAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":24121805.29,"abc":24125000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-10-12","lat":16.066314,"lon":120.429692,"sm":916,"fm":916,"tm":916,"am":916,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.87,"wp":[16.07414,120.42903],"wst":"matched","br":"Osiem","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":728},{"i":903,"cid":"24AF0013","pid":"P00821472LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Pideg, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":48938884.3,"abc":48999995.93,"fy":"2024","sd":"02/02/2024","cd":"2025-03-16","lat":16.335989,"lon":120.429847,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":2.21,"wp":[16.35587,120.43131],"wst":"matched","br":"Pideg","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":729},{"i":904,"cid":"24A00154","pid":"P00821097LZ","t":"Construction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144749743.4,"abc":144750000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-26","lat":16.36713,"lon":120.429919,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.13,"wp":[16.36599,120.42963],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":730},{"i":905,"cid":"22CA0049","pid":"P00631169LZ","t":"Construction of Flood Control Project along Colo River, San Benito Section, Phase VI-B, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":29399973.04,"abc":29399999.89,"fy":"2022","sd":"02/21/2022","cd":"2022-07-25","lat":14.846764,"lon":120.430239,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Colo","wn":"Colo River","wd":0.01,"wp":[14.84674,120.43034],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":731},{"i":906,"cid":"23A00132","pid":"P00726337LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Magsaysay, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":96463694.46,"abc":96500000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-13","lat":16.354329,"lon":120.430448,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.18,"wp":[16.35592,120.43057],"wst":"matched","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":732},{"i":907,"cid":"24AC0046","pid":"P00844711LZ","t":"Construction of Seawall, San Juan, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SAN JUAN (LAPOG) (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"FIT CONSTRUCTION","c":48899824.9,"abc":49000000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-12-16","lat":17.752225,"lon":120.43111,"sm":1309,"fm":1309,"tm":1309,"am":1309,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":733},{"i":908,"cid":"24CJ0016","pid":"P00820251LZ","t":"Construction of Slope Protection along Bayating River (Segment H), Sta. Ignacia, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"SANTA IGNACIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"BIG BERTHA CONSTRUCTION & DEVELOPMENT","c":89400000.0,"abc":89401460.0,"fy":"2024","sd":"02/13/2024","cd":"2025-01-02","lat":15.619,"lon":120.431239,"sm":1386,"fm":1386,"tm":1386,"am":1386,"md":0.0,"ls":"inside","ww":"Bayating","wn":"Bayating River","wd":8.65,"wp":[15.69599,120.41764],"wst":"matched","br":null,"len":null,"ph":"Segment H","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":734},{"i":909,"cid":"22AD0072","pid":"P00621516LZ","t":"Construction of Quezon Flood Control, Santa, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":9503087.02,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-04","lat":17.486111,"lon":120.431389,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":735},{"i":910,"cid":"24AJ0106","pid":"P00825218LZ","t":"Construction of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":19599951.25,"abc":39200000.0,"fy":"2024","sd":"06/18/2024","cd":"2025-01-24","lat":15.764,"lon":120.432,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.06,"wp":[15.76452,120.43187],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":736},{"i":911,"cid":"23AH0040","pid":"P00737422LZ","t":"Construction of Drainage System at Barangay Bagong Pag-asa, San Jacinto, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":4945988.19,"abc":4950000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-06-14","lat":16.06974,"lon":120.432087,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Pag-asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":737},{"i":912,"cid":"24CJ0029","pid":"P00839595LZ","t":"Construction of Slope Protection Structure along Bayating River (Segment I), Sta. Ignacia, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"SANTA IGNACIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"LAMASIA BUILDERS AND SUPPLY CORP.","c":50000000.0,"abc":49500000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-24","lat":15.617022,"lon":120.432469,"sm":1386,"fm":1386,"tm":1386,"am":1386,"md":0.0,"ls":"inside","ww":"Bayating","wn":"Bayating River","wd":8.89,"wp":[15.69599,120.41764],"wst":"matched","br":null,"len":null,"ph":"Segment I","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":706},{"i":913,"cid":"24AD0025","pid":"P00844715LZ","t":"Construction of Luba Seawall, Santa Lucia, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA LUCIA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":39199443.13,"abc":39200000.0,"fy":"2024","sd":"02/28/2024","cd":"2025-02-05","lat":17.128896,"lon":120.433317,"sm":1388,"fm":1388,"tm":1388,"am":1388,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":738},{"i":914,"cid":"22CK0105","pid":"P00621575LZ","t":"Rehabilitation of Dike along O'Donnell River (Brgy. Sta. Juliana Section, Right Bank), Capas, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96011740.9,"abc":96499705.61,"fy":"2022","sd":"03/26/2022","cd":"2022-11-24","lat":15.33166,"lon":120.43361,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.87,"wp":[15.33774,120.42844],"wst":"matched","br":"Sta. Juliana Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":739},{"i":915,"cid":"25AG0077","pid":"P00941152LZ","t":"Construction of Line Canal, Barangay Quibuar, Alaminos City, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF ALAMINOS (PANGASINAN)","deo":"Pangasinan 1st District Engineering Office","co":"GED CONSTRUCTION","c":4850666.92,"abc":4950000.0,"fy":"2025","sd":"02/10/2025","cd":"2025-05-21","lat":16.356031,"lon":120.433852,"sm":364,"fm":364,"tm":364,"am":1589,"md":43.15,"ls":"outside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quibuar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":43.15,"text":"The pin is 43.1 km outside City of Alaminos, Pangasinan, the nearest municipality the record claims. It falls in Tubao, La Union.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":266},{"i":916,"cid":"23A00122","pid":"P00735956LZ","t":"Construction of Flood Control Structure along Balili River, Barangay Suyo (Package 1), Bagulin, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAGULIN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / KRYPTONITE 6S BUILDERS INC.","c":144749988.7,"abc":144750000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-12-13","lat":16.604235,"lon":120.434461,"sm":111,"fm":111,"tm":111,"am":111,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":17.93,"wp":[16.50814,120.56962],"wst":"matched","br":"Suyo","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":740},{"i":917,"cid":"24A00156","pid":"P00839552LZ","t":"Construction of Flood Control Structure, Aringay River Basin, Barangay Rizal, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19798959.79,"abc":19800000.0,"fy":"2024","sd":"06/24/2024","cd":"2024-08-02","lat":16.363343,"lon":120.434835,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.02,"wp":[16.36323,120.43468],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":741},{"i":918,"cid":"24CK0032","pid":"P00821288LZ","t":"Rehabilitation of Dike along O'Donnell River, (Barangay Sta. Juliana Section, Right Bank), Phase 1, Sta. 5+382.00 to Sta. 5+874.80, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497009.7,"abc":96499511.41,"fy":"2024","sd":"02/20/2024","cd":"2024-11-19","lat":15.334811,"lon":120.436461,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.79,"wp":[15.34075,120.4324],"wst":"matched","br":"Sta. Juliana Section","len":492.8,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":742},{"i":919,"cid":"22AD0063","pid":"P00639423LZ","t":"Construction of San Isidro-San Nicolas Flood Control Structure, Brgys. San Isidro, San Nicolas, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4899852.87,"abc":4900000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-01-30","lat":17.187332,"lon":120.436982,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":743},{"i":920,"cid":"24A00353","pid":"P00821521LZ","t":"Construction of Slope Protection Structure along Agno River, Darawey, Bayambang, Pangasinan, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"ALCEL CONSTRUCTION","c":48249996.93,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-10-11","lat":15.765659,"lon":120.437633,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.05,"wp":[15.76518,120.43759],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":744},{"i":921,"cid":"24AF0097","pid":"P00821100LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Bagulin, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BAGULIN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96403190.33,"abc":96499998.02,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.609634,"lon":120.439071,"sm":111,"fm":111,"tm":111,"am":111,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[858,935],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AF0095 to 24AF0097) cover the same site, together worth PHP 289,384,525.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":239},{"i":922,"cid":"24A00347","pid":"P00823293LZ","t":"Construction of Flood Control Structure along Ribsuan River, Barangay Ribsuan, Naguilian, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"NAGUILIAN (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":115799760.4,"abc":115800000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-11-11","lat":16.51848,"lon":120.439731,"sm":1007,"fm":1007,"tm":1007,"am":1007,"md":0.0,"ls":"inside","ww":"Ribsuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ribsuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":745},{"i":923,"cid":"22AD0075","pid":"P00621507LZ","t":"Construction of San Jose-San Isidro-San Nicolas-Darapidap Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"ARM-ASIA CONSTRUCTION & ENGINEERING","c":19599909.79,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-01-30","lat":17.19139,"lon":120.43984,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":746},{"i":924,"cid":"24A00489","pid":"P00820131LZ","t":"Construction of Flood Mitigation Structure along Ribsuan River, Barangay Caoayan, Burgos, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BURGOS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"LATAWAN EDUARDO AP-O DEVELOPERS CONSTRUCTION SERVICES / E.T. LATAWAN CONSTRUCTION","c":99646322.92,"abc":99680640.0,"fy":"2024","sd":"05/03/2024","cd":"2025-02-09","lat":16.523277,"lon":120.439902,"sm":260,"fm":260,"tm":260,"am":260,"md":0.0,"ls":"inside","ww":"Ribsuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caoayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":747},{"i":925,"cid":"24AJ0011","pid":"P00839563LZ","t":"Construction of Slope Protection Structure along Agno River, Barangay Darawey, Bayambang, Pangasinan, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":8688171.63,"abc":8910000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-17","lat":15.765,"lon":120.44,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.02,"wp":[15.76479,120.43994],"wst":"matched","br":"Darawey","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":579},{"i":926,"cid":"23A00128","pid":"P00726333LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Anduyan, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144719366.2,"abc":144750000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-13","lat":16.357259,"lon":120.440337,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.37,"wp":[16.35826,120.43703],"wst":"matched","br":"Anduyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":748},{"i":927,"cid":"23AD0039","pid":"P00727072LZ","t":"Construction of Calaoan-Calongbuyan-Patpata Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":19011839.42,"abc":19600000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-10-02","lat":17.16418,"lon":120.44034,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":"Calaoan-Calongbuyan-Patpata Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":749},{"i":928,"cid":"24AD0045","pid":"P00844713LZ","t":"Construction of Cabangaran Flood Control Structure, Santa, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":9765365.65,"abc":9800000.0,"fy":"2024","sd":"05/07/2024","cd":"2024-07-27","lat":17.54332,"lon":120.44069,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":750},{"i":929,"cid":"24AD0055","pid":"P00845899LZ","t":"Construction of River Control Structure, Santa, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":9899970.35,"abc":9900000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-07-02","lat":17.54161,"lon":120.44082,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":751},{"i":930,"cid":"23A00129","pid":"P00726334LZ","t":"Construction of Flood Control Structure along Aringay River, Barangay Rizal, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144744232.5,"abc":144750000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-13","lat":16.358549,"lon":120.441334,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":0.45,"wp":[16.35886,120.43714],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":752},{"i":931,"cid":"23AD0038","pid":"P00727071LZ","t":"Construction of Calaoan-Paras-San Pedro Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":14258798.76,"abc":14700000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-10-29","lat":17.17066,"lon":120.44147,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":"Calaoan-Paras-San Pedro Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":753},{"i":932,"cid":"23CK0008","pid":"P00726528LZ","t":"Rehabilitation of Existing Dike along O'Donnell River, (Patling Section, Right Bank), Sta. 7 + 658 to Sta. 8 + 214, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":66102126.33,"abc":66102097.11,"fy":"2023","sd":"02/07/2023","cd":"2023-12-22","lat":15.346714,"lon":120.442161,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.13,"wp":[15.34713,120.44104],"wst":"matched","br":null,"len":556.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":754},{"i":933,"cid":"22AD0097","pid":"P00621506LZ","t":"Construction of Paras-San Nicolas-Darapidap Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":38024474.57,"abc":39200000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-03-28","lat":17.184167,"lon":120.442222,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":755},{"i":934,"cid":"23AD0070","pid":"P00742264LZ","t":"Construction of Calaoan Flood Control, Brgy. Calaoan, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":28808249.06,"abc":29700000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-10-28","lat":17.17055,"lon":120.44235,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":756},{"i":935,"cid":"24AF0096","pid":"P00821102LZ","t":"Construction of Flood Control Structures along Bauang River Basin, Burgos, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BURGOS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":96489333.05,"abc":96499981.95,"fy":"2024","sd":"04/16/2024","cd":"2025-03-16","lat":16.515549,"lon":120.44248,"sm":260,"fm":260,"tm":260,"am":260,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[858,921],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AF0095 to 24AF0097) cover the same site, together worth PHP 289,384,525.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":240},{"i":936,"cid":"23A00395","pid":"P00742266LZ","t":"Rehabilitation of Flood Control along Libtong Creek, Brgy. Libtong, Tagudin, Ilocus Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"TAGUDIN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":29698974.86,"abc":29700000.0,"fy":"2023","sd":"06/30/2023","cd":"2023-11-15","lat":16.968971,"lon":120.4429,"sm":1520,"fm":1520,"tm":1520,"am":1520,"md":0.0,"ls":"inside","ww":"Libtong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Libtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":757},{"i":937,"cid":"23AE0018","pid":"P00737414LZ","t":"Construction of Slope Protection at Sitio Paagan West, Paagan, Santol, La Union","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"LA UNION","mu":"SANTOL (LA UNION)","deo":"La Union 1st District Engineering Office","co":"ARM-ASIA CONSTRUCTION & ENGINEERING","c":14690943.27,"abc":14849999.31,"fy":"2023","sd":"02/13/2023","cd":"2023-09-22","lat":16.812341,"lon":120.443508,"sm":1421,"fm":1421,"tm":1421,"am":1421,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":758},{"i":938,"cid":"23AD0036","pid":"P00727069LZ","t":"Construction of San Juan-San Antonio Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":14258915.11,"abc":14700000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-07-30","lat":17.19733,"lon":120.4437,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":"San Juan-San Antonio Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":759},{"i":939,"cid":"23AJ0062","pid":"P00737426LZ","t":"Construction of Slope Protection along Ingalera River, Barangay Bolaoit, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":9610931.99,"abc":9900000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-07-25","lat":15.920716,"lon":120.443805,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.02,"wp":[15.92056,120.44389],"wst":"matched","br":"Bolaoit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":760},{"i":940,"cid":"22AD0089","pid":"P00639425LZ","t":"Construction of Bagar Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9505911.18,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-02-01","lat":17.21224,"lon":120.44395,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":761},{"i":941,"cid":"24A00244","pid":"P00821511LZ","t":"Construction of Flood Control Project along Agno River, Barangay Erfe, Santa Barbara, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA BARBARA (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":48075596.98,"abc":48250000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-19","lat":16.003696,"lon":120.44401,"sm":1370,"fm":1370,"tm":1370,"am":1370,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":15.27,"wp":[16.01489,120.30194],"wst":"matched","br":"Erfe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":762},{"i":942,"cid":"23AD0037","pid":"P00727070LZ","t":"Construction of Oaig Daya-Paras Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":14258847.48,"abc":14700000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-08-27","lat":17.17461,"lon":120.4441,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":"Oaig Daya-Paras Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":763},{"i":943,"cid":"24AD0038","pid":"P00824653LZ","t":"Construction of River Control, Brgy. Basug-Banaoang, Santa, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":4899693.22,"abc":4900000.0,"fy":"2024","sd":"03/27/2024","cd":"2025-01-29","lat":17.52716,"lon":120.44428,"sm":1366,"fm":1366,"tm":1366,"am":1366,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basug-Banaoang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":764},{"i":944,"cid":"24AF0015","pid":"P00825210LZ","t":"Construction of Flood Control Structure along Bauang River Basin, Barangay Dalacdac, Burgos, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"BURGOS (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48264987.53,"abc":48999997.22,"fy":"2024","sd":"02/06/2024","cd":"2024-09-16","lat":16.529115,"lon":120.444803,"sm":260,"fm":260,"tm":260,"am":260,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dalacdac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":765},{"i":945,"cid":"21AC0165","pid":"P00525863LZ","t":"Construction of Flood Control along Bical River, Barangay Guimod, San Juan, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"San Juan","deo":"Ilocos Sur 1st District Engineering Office","co":"R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"06/02/2022","cd":"2022-12-19","lat":17.722933,"lon":120.444998,"sm":1309,"fm":null,"tm":1309,"am":1309,"md":0.0,"ls":"inside","ww":"Bical","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guimod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":766},{"i":946,"cid":"22AD0071","pid":"P00639418LZ","t":"Construction of Calaoan-Paras Flood Control, Brgys. Calaoan, Paras, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9506344.81,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-02-15","lat":17.172778,"lon":120.445,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":767},{"i":947,"cid":"23A00305","pid":"P00727060LZ","t":"Rehabilitation of Flood Control Structure along Poblacion River, Currimao, Ilocos Norte","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CURRIMAO (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"CURRIMAO CONSTRUCTION & DEVELOPMENT, INC.","c":19299781.31,"abc":19300000.0,"fy":"2023","sd":"06/30/2023","cd":"2024-02-11","lat":16.093652,"lon":120.445,"sm":467,"fm":467,"tm":467,"am":1294,"md":207.36,"ls":"outside","ww":"Poblacion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":207.36,"text":"The pin is 207.4 km outside Currimao, Ilocos Norte, the nearest municipality the record claims. It falls in San Jacinto, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":229},{"i":948,"cid":"24A00192","pid":"P00820130LZ","t":"Construction of Flood Mitigation Structure along Bued River-Angalacan River, Barangay Imelda-San Roque, San Jacinto, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN JACINTO (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":96499268.66,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-12","lat":16.044782,"lon":120.445114,"sm":1294,"fm":1294,"tm":1294,"am":1294,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":3.66,"wp":[16.07442,120.43003],"wst":"matched","br":"Imelda-San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.66,"text":"The title names Bued, which OpenStreetMap maps through the stated municipality, but the pin is 3.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":295},{"i":949,"cid":"23CA0014","pid":"P00726147LZ","t":"Construction of Flood Control Project along Colo River, Bacong Section Phase IV-AGP1, Hermosa, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"HERMOSA (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":29399999.37,"abc":29399999.37,"fy":"2023","sd":"02/16/2023","cd":"2023-06-16","lat":14.854877,"lon":120.445539,"sm":615,"fm":615,"tm":615,"am":512,"md":0.02,"ls":"boundary","ww":"Colo","wn":"Colo River","wd":0.02,"wp":[14.85485,120.44532],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":768},{"i":950,"cid":"24AJ0096","pid":"P00845918LZ","t":"Rehabilitation Flood Control Structures along Ingalera River, Brgy. Aliaga, Malasiqui, Pangasinan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":9899990.31,"abc":54450000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-09-11","lat":15.892,"lon":120.446,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.5,"wp":[15.89051,120.45042],"wst":"matched","br":"Aliaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":769},{"i":951,"cid":"23AD0040","pid":"P00727073LZ","t":"Construction of Oaig Daya Bridge and Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":13438847.87,"abc":25480000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-07-30","lat":17.18506,"lon":120.44615,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":770},{"i":952,"cid":"21AC0022","pid":"P00525861LZ","t":"Construction of Flood Control along Cabugao River, Brgy. Baclig, Cabugao, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"Cabugao","deo":"Ilocos Sur 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"02/24/2022","cd":"2022-10-18","lat":17.800383,"lon":120.446167,"sm":280,"fm":null,"tm":280,"am":280,"md":0.0,"ls":"inside","ww":"Cabugao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baclig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":771},{"i":953,"cid":"22AD0123","pid":"P00621252LZ","t":"Construction of Salvador-Bucong-Villarica-Caterman-Darapidap Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":55969996.9,"abc":56840000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-07-03","lat":17.220556,"lon":120.446389,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":772},{"i":954,"cid":"24CK0044","pid":"P00821302LZ","t":"Rehabilitation of Existing Dike along O'Donnell River (Bueno Section, Left Bank), Phase 8, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":96497506.83,"abc":96499565.7,"fy":"2024","sd":"02/20/2024","cd":"2024-08-21","lat":15.36909,"lon":120.44668,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.8,"wp":[15.36433,120.4523],"wst":"matched","br":null,"len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":773},{"i":955,"cid":"24AD0037","pid":"P00824652LZ","t":"Construction of Balingaoan - Bagar Flood Control Structure, Candon City, Ilocos Sur","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":29399836.91,"abc":29400000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-10-22","lat":17.22519,"lon":120.44692,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":774},{"i":956,"cid":"24A00152","pid":"P00821095LZ","t":"Construction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":144749869.1,"abc":144750000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-26","lat":16.349707,"lon":120.447455,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":1.46,"wp":[16.35826,120.43703],"wst":"matched","br":"Anduyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":775},{"i":957,"cid":"24E00032","pid":"P00823578LZ","t":"Construction of Paluan Shore Protection and Causeway Development, Sitio Malugao Section, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"D.T. RECIO INCORPORATED","c":241244808.2,"abc":241250000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-11-25","lat":13.423418,"lon":120.447922,"sm":1072,"fm":1072,"tm":null,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":776},{"i":958,"cid":"23A00188","pid":"P00725621LZ","t":"Construction of Flood Mitigation Structure along Bued River, Barangay Anonang, San Fabian, Pangasinan, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN FABIAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":91672667.03,"abc":91675000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-12-14","lat":16.097225,"lon":120.4481,"sm":1269,"fm":1269,"tm":1269,"am":1269,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.02,"wp":[16.09713,120.44823],"wst":"matched","br":"Anonang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":777},{"i":959,"cid":"24A00223","pid":"P00820100LZ","t":"Construction of Flood Control along Bued River, Barangay Pias, Mapandan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MAPANDAN (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":120623086.5,"abc":120625000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-10-11","lat":16.039343,"lon":120.448133,"sm":927,"fm":927,"tm":927,"am":927,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":4.34,"wp":[16.07442,120.43003],"wst":"matched","br":"Pias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":778},{"i":960,"cid":"22CA0073","pid":"P00621495LZ","t":"Construction of Flood Control Project in Dalao River, Dinalupihan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48019991.19,"abc":48019996.83,"fy":"2022","sd":"07/21/2022","cd":"2022-12-14","lat":14.902879,"lon":120.448394,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Dalao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":779},{"i":961,"cid":"24AF0053","pid":"P00845901LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Brgy. Anduyan, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19794859.75,"abc":19799995.18,"fy":"2024","sd":"02/27/2024","cd":"2025-02-16","lat":16.348852,"lon":120.448396,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":1.6,"wp":[16.35826,120.43703],"wst":"matched","br":"Anduyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":780},{"i":962,"cid":"22CK0089","pid":"P00640531LZ","t":"Rehabilitation of Existing Bank Along O'Donnell River, (Patling Section, Right Bank), Package 2, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":48779814.7,"abc":48999892.46,"fy":"2022","sd":"03/24/2022","cd":"2022-10-11","lat":15.35997,"lon":120.44845,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Existing Bank Along O'Donnell","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":781},{"i":963,"cid":"24AJ0097","pid":"P00825217LZ","t":"Construction of Flood Control Structure along Agno River, San Vicente Section, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":19066880.39,"abc":39200000.0,"fy":"2024","sd":"05/06/2024","cd":"2024-08-05","lat":15.758,"lon":120.449,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.13,"wp":[15.75906,120.44958],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":782},{"i":964,"cid":"22AD0096","pid":"P00639422LZ","t":"Construction of San Antonio Flood Control Structure, Barangay San Antonio, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4898072.66,"abc":4900000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-13","lat":17.19784,"lon":120.4493,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":783},{"i":965,"cid":"22AD0108","pid":"P00639419LZ","t":"Construction of Flood Control Structure, San Jose, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9799414.09,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-01-30","lat":17.188889,"lon":120.449444,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":784},{"i":966,"cid":"23CK0049","pid":"P00726908LZ","t":"Rehabilitation of Dike along O'Donnell River, Sta. 8 + 564 to 8 + 888, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION / BOLTRON BUILDERS CORPORATION","c":72336770.79,"abc":72374439.79,"fy":"2023","sd":"04/10/2023","cd":"2023-12-09","lat":15.371639,"lon":120.449547,"sm":327,"fm":327,"tm":null,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.72,"wp":[15.36817,120.45527],"wst":"matched","br":null,"len":324.0,"ph":null,"dup":[],"run":[208,224,990],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0046 to 23CK0049) cover the same site, together worth PHP 289,418,577.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":390},{"i":967,"cid":"22A00011","pid":"P00620128LZ","t":"Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase III","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN FABIAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":50192545.0,"abc":50192545.0,"fy":"2022","sd":"02/24/2022","cd":"2023-03-25","lat":16.098947,"lon":120.449676,"sm":1269,"fm":1269,"tm":1269,"am":1269,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.07,"wp":[16.09831,120.44986],"wst":"matched","br":"Anonang","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":785},{"i":968,"cid":"22AD0087","pid":"P00639424LZ","t":"Construction of San Juan Flood Control, Barangay San Juan, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4897303.83,"abc":4900000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-09-19","lat":17.194722,"lon":120.45,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":580},{"i":969,"cid":"22A00260","pid":"P00621551LZ","t":"Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"TAGUDIN (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"A.P.B. CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":241248185.8,"abc":241250000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-02-28","lat":16.917385,"lon":120.45008,"sm":1520,"fm":1520,"tm":1520,"am":1520,"md":0.0,"ls":"inside","ww":"Amburayan","wn":"Amburayan River","wd":1.03,"wp":[16.91088,120.45694],"wst":"matched","br":"Bucao West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":786},{"i":970,"cid":"24AF0018","pid":"P00821471LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Barangay Linapew, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":48989608.07,"abc":48999998.13,"fy":"2024","sd":"02/06/2024","cd":"2024-07-29","lat":16.31609,"lon":120.450099,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":4.75,"wp":[16.35649,120.4351],"wst":"matched","br":"Linapew","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.75,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 4.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":345},{"i":971,"cid":"24E00117","pid":"P00823575LZ","t":"Construction of Paluan Shore Protection and Causeway Development, Sitio Ipol Section, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"D.T. RECIO INCORPORATED","c":289494221.9,"abc":289500000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-11-25","lat":13.422085,"lon":120.450799,"sm":1072,"fm":1072,"tm":null,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":787},{"i":972,"cid":"23EB0079","pid":"P00740654LZ","t":"Construction of Maduron Flood Control Structure, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":28695558.08,"abc":29400000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-12-15","lat":13.437535,"lon":120.451022,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":788},{"i":973,"cid":"23AD0071","pid":"P00742265LZ","t":"Construction of San Jose-San Isidro Flood Control, Brgy. San Jose and San Isidro, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"ARM-ASIA CONSTRUCTION & ENGINEERING","c":23995298.2,"abc":24750000.0,"fy":"2023","sd":"05/11/2023","cd":"2024-01-22","lat":17.189861,"lon":120.451362,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":789},{"i":974,"cid":"24A00265","pid":"P00838502LZ","t":"Construction of River Control at Barangay Poblacion Norte, Poblacion Este, and Saoat, Sta. Cruz, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CRUZ (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":29853362.81,"abc":29915000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-10-24","lat":17.086901,"lon":120.451914,"sm":1374,"fm":1374,"tm":1374,"am":1374,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":790},{"i":975,"cid":"23AD0051","pid":"P00727084LZ","t":"Construction of Oaig Daya-San Nicolas-Paypayad-Darapidap Flood Control, Oaig Daya, San Nicolas, Paypayad. And Darapidap, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":47529939.93,"abc":49000000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-10-29","lat":17.17983,"lon":120.45273,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":791},{"i":976,"cid":"23AJ0030","pid":"P00726080LZ","t":"Construction of Slope Protection Works along Ingalera River, barangay Agdao, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":19370790.58,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-07-17","lat":15.920808,"lon":120.452927,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.01,"wp":[15.9209,120.45296],"wst":"matched","br":"Agdao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":792},{"i":977,"cid":"23AJ0033","pid":"P00726066LZ","t":"Construction of Slope Protection Works along Angalacan River, Coral, Mapandan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MAPANDAN (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":47574067.96,"abc":49000000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-11-17","lat":16.033799,"lon":120.452945,"sm":927,"fm":927,"tm":927,"am":927,"md":0.0,"ls":"inside","ww":"Angalacan","wn":"Angalacan River","wd":0.02,"wp":[16.03391,120.45305],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":793},{"i":978,"cid":"24AJ0030","pid":"P00821516LZ","t":"Construction of Slope Protection along Agno River, Barangay Pugo, Bayambang, Pangasinan (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"MIGHTYWAY CONSTRUCTION AND SUPPLY","c":48999993.3,"abc":49000000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-14","lat":15.76,"lon":120.453,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.07,"wp":[15.75947,120.45338],"wst":"matched","br":"Pugo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":448},{"i":979,"cid":"24AC0004","pid":"P00820708LZ","t":"Construction of Flood Control along Sinait River, Barangay Macabiag, Sinait, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SINAIT (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"739 BUILDERS","c":33436397.22,"abc":33810000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-07-12","lat":17.867417,"lon":120.453138,"sm":1460,"fm":1460,"tm":1460,"am":1460,"md":0.0,"ls":"inside","ww":"Sinait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Macabiag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":794},{"i":980,"cid":"22CK0055","pid":"P00620547LZ","t":"Rehabilitation of Existing Bank along O'Donnell River (Bueno Section, Left Bank), Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":48998948.62,"abc":48999323.9,"fy":"2022","sd":"01/29/2022","cd":"2022-08-23","lat":15.36888,"lon":120.45333,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.22,"wp":[15.36785,120.45507],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":795},{"i":981,"cid":"22A00010","pid":"P00620127LZ","t":"Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN FABIAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":101325000.0,"abc":101325000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-03-24","lat":16.098,"lon":120.453508,"sm":1269,"fm":1269,"tm":1269,"am":1294,"md":0.12,"ls":"boundary","ww":"Bued","wn":"Bued River","wd":0.18,"wp":[16.09908,120.45221],"wst":"matched","br":"Anonang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":796},{"i":982,"cid":"22AD0084","pid":"P00640497LZ","t":"Construction of Santiago River Control, Santiago, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTIAGO (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"EJIEV CONSTRUCTION SERVICES","c":19799604.18,"abc":19800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-17","lat":17.233819,"lon":120.453659,"sm":1407,"fm":1407,"tm":1407,"am":378,"md":0.04,"ls":"boundary","ww":"Santiago","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":797},{"i":983,"cid":"24AF0050","pid":"P00845903LZ","t":"Construction of Flood Control Structure along Aringay River Basin, Brgy. Lloren, Tubao, La Union","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"LA UNION","mu":"TUBAO (LA UNION)","deo":"La Union 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29693483.68,"abc":29699999.35,"fy":"2024","sd":"02/27/2024","cd":"2025-03-16","lat":16.3361,"lon":120.4538,"sm":1589,"fm":1589,"tm":1589,"am":1589,"md":0.0,"ls":"inside","ww":"Aringay","wn":"Aringay River","wd":3.02,"wp":[16.35649,120.4351],"wst":"matched","br":"Lloren","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.02,"text":"The title names Aringay, which OpenStreetMap maps through the stated municipality, but the pin is 3.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":411},{"i":984,"cid":"21AD0038","pid":"P00525877LZ","t":"Completion of Bagani Ubbog-San Juan-San Antonio Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"City of Candon","deo":"Ilocos Sur 2nd District Engineering Office","co":"E.E. MADAYAG CONSTRUCTION","c":34299202.57,"abc":34300000.0,"fy":"2021","sd":"10/19/2021","cd":"2022-08-30","lat":17.194823,"lon":120.453902,"sm":378,"fm":null,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":"Bagani Ubbog-San Juan-San Antonio Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":798},{"i":985,"cid":"22AD0074","pid":"P00621505LZ","t":"Construction of Allangigan-Oaig Daya-San Nicolas-Darapidap Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":47529460.53,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-11-03","lat":17.180833,"lon":120.454167,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[986],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 57,035,364.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":894},{"i":986,"cid":"22AD0088","pid":"P00639426LZ","t":"Construction of Oaig Daya Flood Control, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":9505903.16,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-01-31","lat":17.180833,"lon":120.454167,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[985],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 57,035,364.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1042},{"i":987,"cid":"23AJ0125","pid":"P00727340LZ","t":"Construction of Slope Protection along Agno River, Barangay Pugo, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9491249.25,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-12-18","lat":15.7606,"lon":120.4542,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.04,"wp":[15.76034,120.45447],"wst":"matched","br":"Pugo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":799},{"i":988,"cid":"23CK0044","pid":"P00727148LZ","t":"Rehabilitation of Existing dike along O'donnell River, Barangay Bueno Section, Left Bank, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":47188039.2,"abc":47235498.37,"fy":"2023","sd":"02/28/2023","cd":"2023-10-26","lat":15.369161,"lon":120.454261,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'donnell","wn":"O' Donnel River","wd":0.15,"wp":[15.36817,120.45527],"wst":"matched","br":"Bueno Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":800},{"i":989,"cid":"22CA0020","pid":"P00620502LZ","t":"Construction of Flood Control Project along Pita River, Phase ERD-I, Dinalupan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"DINALUPIHAN (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":24499999.95,"abc":24499999.95,"fy":"2022","sd":"02/14/2022","cd":"2022-07-16","lat":14.901398,"lon":120.454678,"sm":512,"fm":512,"tm":512,"am":512,"md":0.0,"ls":"inside","ww":"Pita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":801},{"i":990,"cid":"23CK0048","pid":"P00726909LZ","t":"Rehabilitation of Dike along O'Donnell River, Sta 8 + 264.80 to 8 + 564, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":72344902.59,"abc":72374866.25,"fy":"2023","sd":"04/18/2023","cd":"2023-12-17","lat":15.374311,"lon":120.454958,"sm":327,"fm":327,"tm":null,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.6,"wp":[15.36953,120.45758],"wst":"matched","br":null,"len":299.2,"ph":null,"dup":[],"run":[208,224,966],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0046 to 23CK0049) cover the same site, together worth PHP 289,418,577.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":391},{"i":991,"cid":"24AC0002","pid":"P00820102LZ","t":"Construction of Flood Control along Sinait River, Barangay Pug-os, Sinait, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SINAIT (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION","c":36959500.0,"abc":36959500.0,"fy":"2024","sd":"02/23/2024","cd":"2024-10-25","lat":17.838429,"lon":120.455381,"sm":1460,"fm":1460,"tm":1460,"am":1460,"md":0.0,"ls":"inside","ww":"Sinait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pug-os","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":802},{"i":992,"cid":"22AC0006","pid":"P00620935LZ","t":"Construction of Flood Control along Parsua River, Brgy. Bungro, Magsingal, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"MAGSINGAL (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION","c":45080000.0,"abc":45080000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-12-17","lat":17.722963,"lon":120.456036,"sm":873,"fm":873,"tm":873,"am":1309,"md":1.05,"ls":"adjacent","ww":"Parsua","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bungro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":803},{"i":993,"cid":"22A00009","pid":"P00620126LZ","t":"Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN FABIAN (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":101325000.0,"abc":101325000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-31","lat":16.109563,"lon":120.456312,"sm":1269,"fm":1269,"tm":1269,"am":1269,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.3,"wp":[16.10917,120.4591],"wst":"matched","br":"Anonang","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":804},{"i":994,"cid":"22AD0090","pid":"P00641866LZ","t":"Construction of Langlangca 2nd Flood Control and Drainage Canal, Candon City, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"CITY OF CANDON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"M.V. SABALBURO CONSTRUCTION AND SUPPLY","c":9506079.06,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-02-01","lat":17.223433,"lon":120.456458,"sm":378,"fm":378,"tm":378,"am":378,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":805},{"i":995,"cid":"22AC0007","pid":"P00620936LZ","t":"Construction of Flood Control along Sinait River, Brgy. Pug-os, Sinait, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SINAIT (ILOCOS SUR)","deo":"Ilocos Sur 1st District Engineering Office","co":"A.P.B. CONSTRUCTION / R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY)","c":45239740.0,"abc":45239740.0,"fy":"2022","sd":"03/25/2022","cd":"2023-01-06","lat":17.837652,"lon":120.456711,"sm":1460,"fm":1460,"tm":1460,"am":1460,"md":0.0,"ls":"inside","ww":"Sinait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pug-os","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":806},{"i":996,"cid":"23AJ0125","pid":"P00727338LZ","t":"Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BAYAMBANG (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":9491560.96,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2023-12-18","lat":15.773117,"lon":120.457186,"sm":194,"fm":194,"tm":194,"am":194,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.32,"wp":[15.77396,120.46004],"wst":"matched","br":"Iton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":807},{"i":997,"cid":"22AD0086","pid":"P00621515LZ","t":"Construction of Buaya River Control, Sta. Cruz, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SANTA CRUZ (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":19599991.64,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-09-06","lat":17.09396,"lon":120.45722,"sm":1374,"fm":1374,"tm":1374,"am":1374,"md":0.0,"ls":"inside","ww":"Buaya","wn":"Buaya River","wd":0.08,"wp":[17.09328,120.4574],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":808},{"i":998,"cid":"23AJ0069","pid":"P00737430LZ","t":"Construction of Slope Protection at Barangay Baloling Phase IV, Mapandan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MAPANDAN (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"JEUSMACK BUILDERS & CONSTRUCTION SUPPLY","c":4803991.53,"abc":4950000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-06-23","lat":16.02969,"lon":120.45754,"sm":927,"fm":927,"tm":927,"am":927,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baloling Phase IV","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":809},{"i":999,"cid":"23AJ0034","pid":"P00726081LZ","t":"Construction of Slope Protection Works along Ingalera River, barangay Talospatang, Malasiqui, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MALASIQUI (PANGASINAN)","deo":"Pangasinan 4th District Engineering Office","co":"LXS  BUILDERS &  SUPPLIES","c":19599995.26,"abc":19600000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-04-11","lat":15.9166,"lon":120.45761,"sm":891,"fm":891,"tm":891,"am":891,"md":0.0,"ls":"inside","ww":"Ingalera","wn":"Ingalera River","wd":0.02,"wp":[15.91674,120.45779],"wst":"matched","br":"Talospatang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":810},{"i":1000,"cid":"24CI0013","pid":"P00838533LZ","t":"Construction of Slope Protection Structure along Navaling Creek, Barangay Navaling, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":48975497.41,"abc":48983545.27,"fy":"2024","sd":"02/08/2024","cd":"2024-07-07","lat":15.22811,"lon":120.6697,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Navaling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Navaling","len":null,"ph":null,"dup":[1999],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 126,162,376.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":895},{"i":1001,"cid":"22PA0077","pid":"P00637008LZ","t":"Construction of Canan Flood Control, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497818.75,"abc":96499903.01,"fy":"2022","sd":"05/18/2022","cd":"2023-01-31","lat":17.659386,"lon":120.669761,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":811},{"i":1002,"cid":"22CB0063","pid":"P00620511LZ","t":"Construction of Flood Control Structure at Talisay River, Brgy. Central (Station 9+481 - Station 9+810) City of Balanga, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"E.R. VENZON CONSTRUCTION / VF CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-11-25","lat":14.639606,"lon":120.530604,"sm":366,"fm":366,"tm":null,"am":366,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.03,"wp":[14.63949,120.53087],"wst":"matched","br":"Central","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":812},{"i":1003,"cid":"22CK0086","pid":"P00621540LZ","t":"Rehabilitation of Dike along Lucung River, (San Jose Section, Right Bank), Concepcion, Tarlac (Sta. 0+640 to Sta. 0+971)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP.","c":40068405.31,"abc":40179626.14,"fy":"2022","sd":"03/24/2022","cd":"2022-10-16","lat":15.324389,"lon":120.670386,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":331.0,"ph":null,"dup":[],"run":[1548,1303,1745],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22CK0085 to 22CK0088) cover the same site, together worth PHP 280,552,442.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":574},{"i":1004,"cid":"22CG0055","pid":"P00631240LZ","t":"Construction of Slope Protection at Cabalantian-Mesalipit Road, Bacolor, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":46549626.36,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-28","lat":14.993439,"lon":120.67072,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":813},{"i":1005,"cid":"23CK0011","pid":"P00726905LZ","t":"Construction of Groundsill with Reinforced Concrete Slope Protection Structure along Parua River, Downstream of Sta. Rita Bridge (Phase 1), Concepcion,Tarlac","w":"Construction of Groundsill","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":72362396.98,"abc":72374965.2,"fy":"2023","sd":"03/17/2023","cd":"2023-10-16","lat":15.30355,"lon":120.670792,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.13,"wp":[15.30473,120.67068],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":814},{"i":1006,"cid":"24AD0105","pid":"P00838500LZ","t":"Construction of Iteb River Wall, Malideg, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP.","c":4810540.4,"abc":4825000.0,"fy":"2024","sd":"07/02/2024","cd":"2024-10-08","lat":17.16333,"lon":120.67101,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":"Iteb","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":815},{"i":1007,"cid":"24CK0033","pid":"P00821289LZ","t":"Rehabilitation of Dike along O'Donnell River, (Downstream of Palublub Bridge, Left Bank), Phase 1, Sta. 0 + 000 to Sta. 0+494.34, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96482027.45,"abc":96499799.46,"fy":"2024","sd":"02/20/2024","cd":"2024-11-19","lat":15.405942,"lon":120.530639,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.28,"wp":[15.40819,120.52946],"wst":"matched","br":null,"len":494.3,"ph":"Phase 1","dup":[],"run":[1119,1138,1178,1206],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CK0033 to 24CK0038) cover the same site, together worth PHP 482,468,808.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":241},{"i":1008,"cid":"23CI0079","pid":"P00740637LZ","t":"Improvement/Rehabilitation/Construction of Drainage Brgy. Cutcut, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":4893962.58,"abc":4899594.85,"fy":"2023","sd":"04/12/2023","cd":"2023-06-10","lat":15.136316,"lon":120.579313,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cutcut","len":null,"ph":null,"dup":[1450],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 43,250,225.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1043},{"i":1009,"cid":"22A00180","pid":"P00620125LZ","t":"Construction of Flood Mitigation Structure along Bongo River, Brgy. Macayepyep, Banna, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":48249980.91,"abc":48250000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-19","lat":17.93558,"lon":120.67131,"sm":154,"fm":154,"tm":154,"am":1027,"md":0.17,"ls":"boundary","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Macayepyep","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":816},{"i":1010,"cid":"24AI0244","pid":"P00843184LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied Rivers, Package 1, Pozorrubio, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"POZORRUBIO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.G.TABIN CONSTRUCTION AND SUPPLY / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":86631574.25,"abc":86850000.0,"fy":"2024","sd":"06/07/2024","cd":"2024-07-25","lat":16.089606,"lon":120.579433,"sm":1168,"fm":1168,"tm":1168,"am":1168,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":817},{"i":1011,"cid":"23CA0022","pid":"P00737449LZ","t":"Construction of Flood Control Project in Barangay Laon, Abucay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"HEBREWS BUILDERS AND CONSTRUCTION CORP.","c":4949986.96,"abc":4949994.47,"fy":"2023","sd":"04/24/2023","cd":"2023-09-20","lat":14.72271,"lon":120.5307,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Laon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":818},{"i":1012,"cid":"24CK0074","pid":"P00838440LZ","t":"Rehabilitation of Existing Dike along Lucung River (San Jose Section, Right Bank), Package B, Sta. 0+855.00 to Sta. 1+325.47, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96497898.96,"abc":96499192.04,"fy":"2024","sd":"02/20/2024","cd":"2024-08-21","lat":15.3241,"lon":120.672106,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":470.5,"ph":"Package B","dup":[],"run":[1043,1046,1310,1614,1872],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":242},{"i":1013,"cid":"22PA0331","pid":"P00637056LZ","t":"Construction of Bañacao Flood Control, Bangued, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BANGUED (CAPITAL) (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48810861.7,"abc":48999972.54,"fy":"2022","sd":"12/28/2022","cd":"2023-05-04","lat":17.613953,"lon":120.579814,"sm":150,"fm":150,"tm":150,"am":150,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":819},{"i":1014,"cid":"23CJ0149","pid":"P00727288LZ","t":"Construction of Slope Protection Structure with Steel Sheet Pile Foundation along San Isidro Creek (Package N), Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":95504333.97,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-20","lat":15.506342,"lon":120.579856,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package N","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":820},{"i":1015,"cid":"24AI0245","pid":"P00843185LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied Rivers, Package 2, Pozorrubio, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"POZORRUBIO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":86674471.29,"abc":86850000.0,"fy":"2024","sd":"06/07/2024","cd":"2024-07-25","lat":16.092592,"lon":120.579903,"sm":1168,"fm":1168,"tm":1168,"am":1468,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":821},{"i":1016,"cid":"24CB0019","pid":"P00820807LZ","t":"Construction of Flood Control Structure along Pandam River, Orion, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORION (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-03","lat":14.60644,"lon":120.5804,"sm":1042,"fm":1042,"tm":1042,"am":1042,"md":0.0,"ls":"inside","ww":"Pandam","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":822},{"i":1017,"cid":"23AI0018","pid":"P00726056LZ","t":"Construction of Flood Control Structure along Tagamusing River, Sta. 0 + 000 - Sta. 0 + 304, Barangay Tulong, Urdaneta City, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":39120577.49,"abc":39200000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-04-19","lat":16.01556,"lon":120.5811,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Tagamusing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tulong","len":304.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":823},{"i":1018,"cid":"24A00310","pid":"P00821491LZ","t":"Construction of Flood Control Mitigation Structure along Agno River and Allied Rivers, Rosales, Pangasinan (Package 2)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48248674.94,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-15","lat":15.884278,"lon":120.581484,"sm":1215,"fm":1215,"tm":1215,"am":1634,"md":1.41,"ls":"adjacent","ww":"Agno","wn":"Agno River","wd":0.06,"wp":[15.88378,120.58174],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":824},{"i":1019,"cid":"22CI0118","pid":"P00632852LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek, (Station 25+170 to Station 26+630 (R/D), Brgy. Mabiga, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19790645.85,"abc":19795564.92,"fy":"2022","sd":"03/24/2022","cd":"2022-08-17","lat":15.199316,"lon":120.58167,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":1.68,"wp":[15.21293,120.57481],"wst":"matched","br":"Mabiga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":825},{"i":1020,"cid":"22A00172","pid":"P00620786LZ","t":"Construction of Flood Control Structure along Quiaoit River, Downstream of Alwinaldo Bridge, Brgy. Maipalig, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":72374999.88,"abc":72375000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-09","lat":17.9826,"lon":120.5819,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.01,"wp":[17.98265,120.58188],"wst":"matched","br":"Maipalig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":826},{"i":1021,"cid":"23CI0051","pid":"P00740640LZ","t":"Improvement/Rehabilitation/Construction of Drainage Mabalacat City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"CMDV CONSTRUCTION","c":9742198.4,"abc":9796511.77,"fy":"2023","sd":"04/24/2023","cd":"2023-08-21","lat":15.207074,"lon":120.581914,"sm":840,"fm":840,"tm":null,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[1022],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 14,672,092.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1044},{"i":1022,"cid":"23CI0136","pid":"P00742362LZ","t":"Upgrading of Drainage system at Brgy. Mawaque, Mawaque-Mabiga Road, Mabalacat City, Pampanga","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"GEOHEART CONSTRUCTION & TRADING","c":4929893.59,"abc":4948755.38,"fy":"2023","sd":"05/22/2023","cd":"2023-09-18","lat":15.207074,"lon":120.581914,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mawaque","len":null,"ph":null,"dup":[1021],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 14,672,092.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1045},{"i":1023,"cid":"22PE0011","pid":"P00620474LZ","t":"Construction/ Rehabilitation of Flood Mitigation Structure, Drainage Canal at Strawberry Fields, La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"D.G.O.  CONSTRUCTION","c":24489189.7,"abc":24500000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-08-11","lat":16.458067,"lon":120.582207,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":827},{"i":1024,"cid":"22CI0116","pid":"P00639484LZ","t":"Construction of River Wall along Sapang Belen Creek (Sta. Ines Mangalit Segment), Mabalacat, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48990447.35,"abc":48995974.4,"fy":"2022","sd":"03/24/2022","cd":"2022-09-24","lat":15.229488,"lon":120.582588,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sapang Belen","wn":"Sapang Balen","wd":10.55,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":828},{"i":1025,"cid":"23PA0020","pid":"P00726391LZ","t":"Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BANGUED (CAPITAL) (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96500000.0,"abc":96499906.45,"fy":"2023","sd":"03/30/2023","cd":"2024-01-02","lat":17.616299,"lon":120.582749,"sm":150,"fm":150,"tm":150,"am":150,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[1321,1505,1933],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23PA0019 to 23PA0022) cover the same site, together worth PHP 385,999,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":197},{"i":1026,"cid":"24EB0070","pid":"P00824741LZ","t":"Construction of Protection Dike along East Bank of Tiguilan River, Barangay Tayamaan, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KGB ENGINEERING AND CONSTRUCTION","c":24404898.79,"abc":24500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-21","lat":13.228016,"lon":120.582885,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":"Tiguilan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tayamaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":829},{"i":1027,"cid":"23AA0309","pid":"P00740564LZ","t":"Rehabilitation of Bank Revetment, Barangay Cabaruan, Bacarra, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":19599844.23,"abc":19599844.23,"fy":"2023","sd":"05/24/2023","cd":"2024-02-09","lat":18.269365,"lon":120.583046,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":830},{"i":1028,"cid":"23AA0290","pid":"P00740545LZ","t":"Construction of Slope Protection at Sitio Sadiri, Barangay 35 Pipias, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"TMT CONSTRUCTION","c":4899902.53,"abc":4899907.67,"fy":"2023","sd":"05/05/2023","cd":"2023-07-20","lat":18.276312,"lon":120.583163,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"35 Pipias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":831},{"i":1029,"cid":"23AA0289","pid":"P00740544LZ","t":"Construction of Slope Protection at Sitio Liwliwa to Namnama, Barangay 35 Pipias, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"TMT CONSTRUCTION","c":4899445.26,"abc":4899540.56,"fy":"2023","sd":"04/25/2023","cd":"2023-07-17","lat":18.270365,"lon":120.583287,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"35 Pipias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":832},{"i":1030,"cid":"23CI0054","pid":"P00740638LZ","t":"Improvement/Rehabilitation/Construction of Drainage Brgy. Pulung Cacutud, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":4892224.65,"abc":4944109.09,"fy":"2023","sd":"03/24/2023","cd":"2023-05-22","lat":15.150744,"lon":120.583344,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulung Cacutud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":833},{"i":1031,"cid":"23CK0042","pid":"P00726192LZ","t":"Rehabilitation of Existing dike along Lucung River (Upstream of Cut-Cut Bridge, Right Bank) Sta. (-) 10 + 562.00 to Sta. (-) 10 + 362.00, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":46341067.43,"abc":47529668.4,"fy":"2023","sd":"01/31/2023","cd":"2023-06-26","lat":15.32776,"lon":120.5834,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1467,1567,1849],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0040 to 23CK0043) cover the same site, together worth PHP 193,395,349.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":540},{"i":1032,"cid":"24AA0078","pid":"P00820675LZ","t":"Construction of Flood Control Structure along Bislak River, Barangay Ganagan-Casilian, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":29399925.82,"abc":29399932.06,"fy":"2024","sd":"02/29/2024","cd":"2024-04-16","lat":18.255849,"lon":120.583507,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ganagan-Casilian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":834},{"i":1033,"cid":"24CI0001","pid":"P00838532LZ","t":"Construction of Reinforced Concrete Slope Protection Structure with Groundsill along Sapangbalen Creek, Barangay Pulungbulu, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":48992434.5,"abc":49483403.18,"fy":"2024","sd":"02/08/2024","cd":"2024-06-24","lat":15.15155,"lon":120.5837,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":18.45,"wp":[15.31113,120.63319],"wst":"matched","br":"Pulungbulu","len":null,"ph":null,"dup":[1034,1035],"run":[],"cl":[],"L":"field","s":30,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,968,626.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":662},{"i":1034,"cid":"24CI0004","pid":"P00838359LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Abacan River, Barangay Pampang, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":96478456.8,"abc":96482277.85,"fy":"2024","sd":"03/14/2024","cd":"2024-10-08","lat":15.15155,"lon":120.5837,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15133,120.58375],"wst":"matched","br":"Pampang","len":null,"ph":null,"dup":[1033,1035],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,968,626.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":541},{"i":1035,"cid":"24CI0039","pid":"P00838360LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Abacan River, Upstream of Friendship Bridge, Barangay Anunas, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TONKA CONSTRUCTION","c":67497735.16,"abc":67508966.65,"fy":"2024","sd":"02/16/2024","cd":"2024-12-05","lat":15.15155,"lon":120.5837,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15133,120.58375],"wst":"matched","br":"Anunas","len":null,"ph":null,"dup":[1033,1034],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,968,626.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":608},{"i":1036,"cid":"23CI0029","pid":"P00726183LZ","t":"Construction of Groundsill along Abacan River, Barangay Anunas, Angeles City, Pampanga","w":"Construction of Groundsill","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":29397875.38,"abc":29398758.28,"fy":"2023","sd":"02/10/2023","cd":"2023-06-09","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Anunas","len":null,"ph":null,"dup":[1037,1038,1039,1040,1041,1042],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":134},{"i":1037,"cid":"23CI0039","pid":"P00727139LZ","t":"Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 1","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NEZIAH BUILDERS AND TRADING CORP.","c":29205689.03,"abc":29395624.57,"fy":"2023","sd":"03/20/2023","cd":"2023-05-22","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Amsic","len":null,"ph":"Phase 1","dup":[1036,1038,1039,1040,1041,1042],"run":[],"cl":[],"L":"records","s":55,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":141},{"i":1038,"cid":"23CI0047","pid":"P00727140LZ","t":"Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 2","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TONKA CONSTRUCTION","c":24495203.65,"abc":24498744.06,"fy":"2023","sd":"03/06/2023","cd":"2023-04-23","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Amsic","len":null,"ph":"Phase 2","dup":[1036,1037,1039,1040,1041,1042],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":146},{"i":1039,"cid":"23CI0069","pid":"P00742359LZ","t":"Construction of Slope Protection with Street Sheet Piles Foundation along Abacan River, Brgy. Pampang, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":17773537.48,"abc":17813921.54,"fy":"2023","sd":"04/03/2023","cd":"2023-07-01","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Pampang","len":null,"ph":null,"dup":[1036,1037,1038,1040,1041,1042],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":166},{"i":1040,"cid":"23CI0085","pid":"P00742358LZ","t":"Construction of Slope Protection with Street Sheet Piles Foundation along Abacan River, Brgy. Malabanias, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":11870351.08,"abc":11875217.83,"fy":"2023","sd":"04/12/2023","cd":"2023-06-10","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Malabanias","len":null,"ph":null,"dup":[1036,1037,1038,1039,1041,1042],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":167},{"i":1041,"cid":"23CI0123","pid":"P00740359LZ","t":"Construction of Slope Protection Structure along Abacan River, Barangays Sta. Teresita to Anunas Section, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":53056624.6,"abc":53061678.21,"fy":"2023","sd":"05/24/2023","cd":"2023-10-20","lat":15.151546,"lon":120.583712,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15134,120.58376],"wst":"matched","br":"Sta. Teresita","len":null,"ph":null,"dup":[1036,1037,1038,1039,1040,1042],"run":[],"cl":[],"L":"records","s":64,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":67},{"i":1042,"cid":"24CI0051","pid":"P00844765LZ","t":"Improvement of Flood Control Structure in Mabalacat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION","c":4791176.6,"abc":4897086.94,"fy":"2024","sd":"03/14/2024","cd":"2024-05-27","lat":15.151546,"lon":120.583712,"sm":840,"fm":840,"tm":null,"am":61,"md":2.09,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[1036,1037,1038,1039,1040,1041],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":6,"text":"This exact pin is shared with 6 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.25,"value":6,"text":"6 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 170,590,458.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":296},{"i":1043,"cid":"24CK0067","pid":"P00838433LZ","t":"Rehabilitation of Existing Dike along Lucung River (Susuba Section), Phase 3, Sta. 0+000.00 to Sta. 0+612.15, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":96493753.29,"abc":96499387.0,"fy":"2024","sd":"05/10/2024","cd":"2024-10-04","lat":15.318136,"lon":120.583742,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":612.1,"ph":"Phase 3","dup":[],"run":[1046,1310,1614,1872,1012],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":243},{"i":1044,"cid":"23CJ0219","pid":"P00742369LZ","t":"Construction of Drainage Canal, Brgy San Rafael Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"JAM-C BUILDERS","c":19399488.28,"abc":19800000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-26","lat":15.463181,"lon":120.583856,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Rafael Tarlac City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":835},{"i":1045,"cid":"24AA0109","pid":"P00820706LZ","t":"Rehabilitation of Flood Control Structure along Bislak River, Barangay Cabaruan-Casilian, Bacarra, Ilocos Norte (Phase 2)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":46039127.59,"abc":46039133.17,"fy":"2024","sd":"02/12/2024","cd":"2024-08-27","lat":18.266965,"lon":120.583907,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaruan-Casilian","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":836},{"i":1046,"cid":"24CK0068","pid":"P00838434LZ","t":"Rehabilitation of Existing Dike along Lucung River (Susuba Section), Phase 4, Sta. 0+000.00 to Sta. 0+634.48, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS","c":96493309.27,"abc":96493935.38,"fy":"2024","sd":"05/10/2024","cd":"2024-11-09","lat":15.318678,"lon":120.583964,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":634.5,"ph":"Phase 4","dup":[],"run":[1043,1310,1614,1872,1012],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":244},{"i":1047,"cid":"24CJ0111","pid":"P00848614LZ","t":"Construction of Flood Control Structures along San Isidro Creek - Tarlac River Section, San Isidro, Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":70000000.0,"abc":69300000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-08","lat":15.511151,"lon":120.584175,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[1048],"run":[],"cl":[],"L":"field","s":47,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 120,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":115},{"i":1048,"cid":"24CJ0125","pid":"P00844767LZ","t":"Construction of Slope Protection Structure along San Isidro Creek (Package P), Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-06-18","lat":15.511151,"lon":120.584175,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package P","dup":[1047],"run":[],"cl":[],"L":"field","s":47,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 120,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":116},{"i":1049,"cid":"23AB0147","pid":"P00726845LZ","t":"Construction of Flood Control Structure along San Agustin Creek, Brgy. San Agustin (Bugnay), San Nicolas, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":14475000.0,"abc":14475000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-02-01","lat":18.13966,"lon":120.58444,"sm":1340,"fm":1340,"tm":1340,"am":1340,"md":0.0,"ls":"inside","ww":"San Agustin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":837},{"i":1050,"cid":"24EB0071","pid":"P00824742LZ","t":"Construction of Protection Dike (Gabions) at Tayamaan River, Tayamaan, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"NEW MINDORENOS LUMBER, HARDWARE AND GEN MERCHANDISE","c":11521786.89,"abc":11522840.0,"fy":"2024","sd":"04/08/2024","cd":"2024-09-02","lat":13.224324,"lon":120.58454,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":"Tayamaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":838},{"i":1051,"cid":"24A00460","pid":"P00823284LZ","t":"Construction of Flood Control Riverbank Structure along Ingalera and Allied Rivers, Package 1, Villasis, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"VILLASIS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":48249366.52,"abc":48250000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-07-15","lat":15.9061,"lon":120.5853,"sm":1634,"fm":1634,"tm":1634,"am":1634,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[1052],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 96,498,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":896},{"i":1052,"cid":"24A00461","pid":"P00823285LZ","t":"Construction of Flood Control Riverbank Structure along Ingalera and Allied Rivers, Package 2, Villasis, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"VILLASIS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48249559.6,"abc":48250000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-07-15","lat":15.9061,"lon":120.5853,"sm":1634,"fm":1634,"tm":1634,"am":1634,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[1051],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 96,498,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":897},{"i":1053,"cid":"22CH0002","pid":"P00620182LZ","t":"Construction of Slope Protection along Angeles-Porac Bypass Road (Phase II), Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96143949.95,"abc":96149217.41,"fy":"2022","sd":"03/02/2022","cd":"2022-11-11","lat":15.1121,"lon":120.58531,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":839},{"i":1054,"cid":"24AA0093","pid":"P00820691LZ","t":"Construction of Flood Control Structure, Barangay Cabaruan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":29399858.39,"abc":29399863.35,"fy":"2024","sd":"02/29/2024","cd":"2024-08-21","lat":18.263252,"lon":120.585369,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":840},{"i":1055,"cid":"22PE0010","pid":"P00620473LZ","t":"Construction of Flood Mitigation Structure within Naguilian River Basin: along Naguilian River Section 2 (Bolo Creek), La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"D.G.O.  CONSTRUCTION","c":24487767.7,"abc":24500000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-11-25","lat":16.459979,"lon":120.585532,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Naguilian","wn":"Naguilian River","wd":5.6,"wp":[16.50814,120.56962],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.6,"text":"The title names Naguilian, which OpenStreetMap maps through the stated municipality, but the pin is 5.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":375},{"i":1056,"cid":"23PE0018","pid":"P00726407LZ","t":"Construction of Flood Mitigation Structure along Bauang River, Section 2 (Bolo Creek), La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":96480000.0,"abc":96500000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-12-22","lat":16.459981,"lon":120.585585,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":841},{"i":1057,"cid":"23CI0020","pid":"P00726182LZ","t":"Construction of Groundsill with Slope Protection along Abacan River, Downstream of NLEX Bridge, Sta. 0+000 - Sta 0+110, Angeles City, Pampanga","w":"Construction of Groundsill","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION","c":48693842.16,"abc":48789447.39,"fy":"2023","sd":"02/10/2023","cd":"2023-06-02","lat":15.151619,"lon":120.585781,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.15183,120.58571],"wst":"matched","br":null,"len":110.0,"ph":null,"dup":[1058],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 114,253,037.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":898},{"i":1058,"cid":"23CI0033","pid":"P00725729LZ","t":"Construction of Groundsill along Abacan River, Sta. 2+850 and Sta. 2+500, Angeles City, Pampanga","w":"Construction of Groundsill","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION / L.S.D.  CONSTRUCTION & SUPPLIES","c":65559195.03,"abc":67535941.79,"fy":"2023","sd":"02/16/2023","cd":"2023-07-31","lat":15.151619,"lon":120.585781,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.15183,120.58571],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1057],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 114,253,037.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":826},{"i":1059,"cid":"24AA0254","pid":"P00839540LZ","t":"Construction of Flood Control Structure Along Bislak River, Barangay 34, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":48999740.13,"abc":48999742.96,"fy":"2024","sd":"02/13/2024","cd":"2024-08-27","lat":18.26153,"lon":120.585978,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"34","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":842},{"i":1060,"cid":"23CI0131","pid":"P00740358LZ","t":"Construction of Slope Protection Structure along Abacan River, Barangays Malabanas to Anunas, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":67506646.63,"abc":67548629.24,"fy":"2023","sd":"05/16/2023","cd":"2023-11-11","lat":15.15202,"lon":120.586956,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.15226,120.58682],"wst":"matched","br":"Malabanas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":843},{"i":1061,"cid":"22CJ0174","pid":"P00620173LZ","t":"Construction of Groundsill Across Tarlac River, Downstream of Ninoy Aquino Bridge, Tarlac City, Tarlac","w":"Construction of Groundsill","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":73765257.64,"abc":75270000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-07-18","lat":15.489106,"lon":120.587478,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Groundsill Across Tarlac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":844},{"i":1062,"cid":"21PE0056","pid":"P00525553LZ","t":"Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 055 + 820 - Sta. 056 + 780, La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"La Trinidad","deo":"Benguet 1st District Engineering Office","co":"KVC CONSTRUCTION / UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":80869305.14,"abc":81078319.98,"fy":"2021","sd":"06/23/2021","cd":"2022-12-20","lat":16.464227,"lon":120.587735,"sm":725,"fm":null,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Naguillian","wn":"Naguilian River","wd":5.23,"wp":[16.50814,120.56962],"wst":"matched","br":null,"len":960.0,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.23,"text":"The title names Naguillian, which OpenStreetMap maps through the stated municipality, but the pin is 5.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":297},{"i":1063,"cid":"23CB0055","pid":"P00742315LZ","t":"Construction of Riverbank Protection of Mamala River at Brgy. Reformista, Limay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"LIMAY (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"DE JESUS CONSTRUCTION","c":9900000.0,"abc":9899804.44,"fy":"2023","sd":"04/03/2023","cd":"2023-06-26","lat":14.565186,"lon":120.588108,"sm":794,"fm":794,"tm":794,"am":794,"md":0.0,"ls":"inside","ww":"Mamala","wn":"Mamala River","wd":0.01,"wp":[14.56532,120.58813],"wst":"matched","br":"Reformista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":845},{"i":1064,"cid":"24EB0046","pid":"P00839656LZ","t":"Construction of Flood Mitigation Structure, Barangay 7, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"STX ENTERPRISES","c":9848740.48,"abc":9900000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-15","lat":13.222853,"lon":120.58817,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"7","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":846},{"i":1065,"cid":"24CI0078","pid":"P00838356LZ","t":"Construction of Reinforced Concrete Slope Protection Structure (Leftside) along Quitangil Creek, Barangay Camachilles, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR / 525 CONSTRUCTION","c":96488518.31,"abc":96486616.8,"fy":"2024","sd":"04/04/2024","cd":"2024-10-29","lat":15.1937,"lon":120.5889,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.44,"wp":[15.2157,120.5877],"wst":"matched","br":"Camachilles","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":847},{"i":1066,"cid":"24PE0044","pid":"P00821530LZ","t":"Construction of Flood Mitigation Structure along Bauang River, Bolo Creek, La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BOKOD (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":39197620.93,"abc":39200000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-28","lat":16.462669,"lon":120.588966,"sm":725,"fm":217,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":10.3,"text":"The record contradicts itself: the title and the pin point to La Trinidad, Benguet, but the municipality field names Bokod, Benguet, 10 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":552},{"i":1067,"cid":"23CJ0121","pid":"P00737486LZ","t":"Construction of Drainage System, Barangay Apulid, Paniqui, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":19304999.69,"abc":19800000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-26","lat":15.681204,"lon":120.589183,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Apulid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":848},{"i":1068,"cid":"22PE0073","pid":"P00639443LZ","t":"Construction (Completion) of Flood Control Structure at Oncasan to Riverside Alno, La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"POLO ENGINEERING & CONSTRUCTION","c":2930210.39,"abc":2940000.0,"fy":"2022","sd":"07/11/2022","cd":"2022-11-08","lat":16.483137,"lon":120.589434,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":849},{"i":1069,"cid":"24AA0257","pid":"P00839543LZ","t":"Rehabilitation of Lined Canal, Barangay 4 San Guillermo, Laoag City, Ilocos Norte","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"CAMBONG-BUILDERS INDUSTRIAL FACILITIES CONSTRUCTION","c":4949545.05,"abc":4949545.2,"fy":"2024","sd":"03/14/2024","cd":"2024-05-15","lat":18.202144,"lon":120.589453,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":"Lined","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"4 San Guillermo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":850},{"i":1070,"cid":"23CJ0138","pid":"P00742133LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Isidro - Sta Maria Section, Tarlac City, Tarlac (Package D)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / RCUBE ENGINEERING SERVICES","c":57419383.62,"abc":57420000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-07-18","lat":15.515408,"lon":120.589508,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.58,"wp":[15.51524,120.59491],"wst":"matched","br":null,"len":null,"ph":"Package D","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":851},{"i":1071,"cid":"24CB0008","pid":"P00820806LZ","t":"Construction of Flood Control Structure along Mamala River, Limay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"LIMAY (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":34300000.0,"abc":34300000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-11-15","lat":14.56551,"lon":120.5897,"sm":794,"fm":794,"tm":794,"am":794,"md":0.0,"ls":"inside","ww":"Mamala","wn":"Mamala River","wd":0.0,"wp":[14.56554,120.58971],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":852},{"i":1072,"cid":"23CH0060","pid":"P00740614LZ","t":"Construction of Slope Protection along Sta. Catalina, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RGZAMORA CONSTRUCTION AND TRADING","c":19593827.54,"abc":19599120.01,"fy":"2023","sd":"04/26/2023","cd":"2023-09-22","lat":14.921889,"lon":120.590212,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":853},{"i":1073,"cid":"23CI0133","pid":"P00740622LZ","t":"Construction of Drainage at Brgy. Sto. Domingo , Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"D.T. TIZON CONSTRUCTION AND TRADING","c":7825746.15,"abc":7834329.88,"fy":"2023","sd":"06/05/2023","cd":"2023-09-02","lat":15.118404,"lon":120.590515,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":854},{"i":1074,"cid":"24CJ0210","pid":"P00823409LZ","t":"Construction of Flood Control Structure along Tarlac River Left Dike (Segment A), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-09-23","lat":15.508925,"lon":120.590681,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.38,"wp":[15.5086,120.59416],"wst":"matched","br":null,"len":null,"ph":"Segment A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":855},{"i":1075,"cid":"23CI0040","pid":"P00740368LZ","t":"Construction of Slope Portection Structure with Steel Sheet Piles Foundation along Abacan River, (R/S) Upstream of PNCC Bridge, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR / 525 CONSTRUCTION","c":77191844.95,"abc":77192940.7,"fy":"2023","sd":"04/11/2023","cd":"2023-08-18","lat":15.17124,"lon":120.590682,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":1.62,"wp":[15.15757,120.59599],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1077],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,589,627.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":798},{"i":1076,"cid":"23CI0135","pid":"P00740619LZ","t":"Construction of Drainage with Outfall at Brgy. Dau, Mabalacat, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":4760182.02,"abc":4899846.7,"fy":"2023","sd":"05/22/2023","cd":"2023-08-19","lat":15.183299,"lon":120.590682,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dau","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":856},{"i":1077,"cid":"23CI0152","pid":"P00740628LZ","t":"Improvement/Rehabilitation of Drainage Brgy. Balibago, Angeles City , Pampanga","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION","c":29397781.56,"abc":29398271.13,"fy":"2023","sd":"06/05/2023","cd":"2023-10-02","lat":15.17124,"lon":120.590682,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balibago","len":null,"ph":null,"dup":[1075],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,589,627.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":981},{"i":1078,"cid":"23AA0288","pid":"P00740543LZ","t":"Construction of Slope Protection at Purok Perlas, Diamante & Corales, Barangay 33, Cabulalaan, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":4899850.31,"abc":4899853.21,"fy":"2023","sd":"04/25/2023","cd":"2023-07-17","lat":18.273759,"lon":120.590739,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"33","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":857},{"i":1079,"cid":"24PE0025","pid":"P00821126LZ","t":"Construction of Flood Mitigation along Bauang River, Main Stream (Balili River), La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"AKSUM CONTRACTING CORPORATION","c":86820000.0,"abc":86850000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-11-22","lat":16.461317,"lon":120.590915,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":858},{"i":1080,"cid":"24EB0032","pid":"P00820406LZ","t":"Construction of Protection Dike at Barangay 8, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":94693310.64,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-15","lat":13.227538,"lon":120.591084,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"8","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":859},{"i":1081,"cid":"24AI0139","pid":"P00844724LZ","t":"Construction of Drainage Canal at W. Taft St. Poblacion to Bued, Binalonan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.G.TABIN CONSTRUCTION AND SUPPLY","c":19548284.0,"abc":19600000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-11-09","lat":16.039167,"lon":120.591111,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":860},{"i":1082,"cid":"23CJ0118","pid":"P00726196LZ","t":"Construction of Drainage at Barangay San Vicente, Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":28663649.83,"abc":29400000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-06-16","lat":15.471103,"lon":120.591156,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":861},{"i":1083,"cid":"23CH0043","pid":"P00740616LZ","t":"Construction of Slope Protection along Patangue Creek, San Antonio, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"M.C. GERONIMO CONSTRUCTION AND TRADING","c":19593178.51,"abc":19598843.36,"fy":"2023","sd":"04/11/2023","cd":"2023-06-15","lat":14.935958,"lon":120.591196,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Patangue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":862},{"i":1084,"cid":"23CK0051","pid":"P00726918LZ","t":"Construction of Existing Dike along Lucung River, Cut-Cut II Section, Right Bank, Capas, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":77196575.9,"abc":77199549.35,"fy":"2023","sd":"03/17/2023","cd":"2023-09-16","lat":15.3254,"lon":120.5912,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":863},{"i":1085,"cid":"23AA0394","pid":"P00742254LZ","t":"Construction of Canal Lining, Brgy. 2, Sta. Joaquina, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":4949436.79,"abc":4949469.37,"fy":"2023","sd":"04/12/2023","cd":"2023-06-30","lat":18.212931,"lon":120.591307,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":864},{"i":1086,"cid":"23AI0090","pid":"P00740569LZ","t":"Construction of Flood Mitigation Structure, Binalonan, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48936920.25,"abc":49000000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-10-30","lat":16.038694,"lon":120.591386,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":865},{"i":1087,"cid":"22CB0065","pid":"P00631175LZ","t":"Construction of River Flood Control, Limay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"LIMAY (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"R.Z. TIGAS CONSTRUCTION AND TRADING","c":9800000.0,"abc":9799999.66,"fy":"2022","sd":"03/24/2022","cd":"2022-08-10","lat":14.565556,"lon":120.591389,"sm":794,"fm":794,"tm":794,"am":794,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":866},{"i":1088,"cid":"24EB0045","pid":"P00839655LZ","t":"Construction of Flood Mitigation Structure, Barangay 5, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"STX ENTERPRISES","c":4948368.84,"abc":4950000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-22","lat":13.222162,"lon":120.59145,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":867},{"i":1089,"cid":"23AA0303","pid":"P00740558LZ","t":"Construction of Flood Control on Main Drainage Canal and Tributaries at South of River (Cabungaan and Apaya Section), Laoag City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48999809.17,"abc":48999860.86,"fy":"2023","sd":"05/05/2023","cd":"2023-10-26","lat":18.510266,"lon":120.591537,"sm":751,"fm":751,"tm":751,"am":258,"md":27.47,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":27.47,"text":"The pin is 27.5 km outside Laoag City, Ilocos Norte, the nearest municipality the record claims. It falls in Burgos, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":168},{"i":1090,"cid":"23CK0053","pid":"P00727151LZ","t":"Rehabilitation of Existing Dike along Lucung River (Cutcut 1st Section, Right Bank), Sta. 0+000 to Sta. 0+200, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.R.T. DWELL LIFESTYLE STORE AND ECO BUILDERS","c":32339347.92,"abc":32339147.58,"fy":"2023","sd":"02/28/2023","cd":"2023-06-20","lat":15.3255,"lon":120.5916,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":868},{"i":1091,"cid":"23CH0046","pid":"P00742346LZ","t":"Construction of Slope Protection along Natividad Creek,Brgy. Natividad, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":29679049.0,"abc":29699208.33,"fy":"2023","sd":"04/17/2023","cd":"2023-09-13","lat":14.9903,"lon":120.5919,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Natividad","wn":"Natividad Stream","wd":0.0,"wp":[14.9903,120.5919],"wst":"matched","br":"Natividad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":869},{"i":1092,"cid":"23CI0066","pid":"P00740636LZ","t":"Improvement/Rehabilitation/Construction of Drainage Brgy. Virgen delos Remedios, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NES-SAN BUILDERS","c":4892626.47,"abc":4894824.65,"fy":"2023","sd":"03/24/2023","cd":"2023-05-22","lat":15.151799,"lon":120.592121,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Virgen delos Remedios","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":870},{"i":1093,"cid":"22CI0012","pid":"P00631263LZ","t":"Construction of Slope Protection Works with Concrete Pavement along Abacan River, Station 4+835 to Station 5+190, Brgy. Balibago, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MICKAJETTE CONSTRUCTION AND TRADING","c":24151028.82,"abc":24498772.7,"fy":"2022","sd":"02/08/2022","cd":"2022-10-05","lat":15.155852,"lon":120.592332,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.09,"wp":[15.15554,120.59307],"wst":"matched","br":"Balibago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":871},{"i":1094,"cid":"22AI0055","pid":"P00620465LZ","t":"Construction of Flood Control Structure along Tagamusing River, Sta. 0+000 + Sta. 0+243.20, Brgy. Sto. Niño, Binalonan, Pangasinan (Package 7)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":39109633.42,"abc":39200000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-07-25","lat":16.05556,"lon":120.5925,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Tagamusing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Niño","len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":872},{"i":1095,"cid":"24AI0025","pid":"P00821508LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 8)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48920129.97,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-05-31","lat":16.064148,"lon":120.592763,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":873},{"i":1096,"cid":"24AI0027","pid":"P00821501LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 10)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":48919089.24,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-03-26","lat":16.036395,"lon":120.5928,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":874},{"i":1097,"cid":"21PD0031","pid":"P00525552LZ","t":"Construction of Flood Mitigation Facilities/ Drainage System along Lake Drive 1 to Juan Luna Drive, Sta 0+000- Sta 0+335 (LS), Baguio City","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Baguio City","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":51660310.0,"abc":51660310.0,"fy":"2021","sd":"04/11/2022","cd":"2022-10-27","lat":16.411644,"lon":120.592955,"sm":110,"fm":null,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Drive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":335.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":875},{"i":1098,"cid":"22PD0020","pid":"P00620993LZ","t":"Construction of Flood Mitigation Facility/Drainage System along Kisad Road to Lake Drive 1 to Abad Santos Drive, Sta. 0+000 - Sta. 0+463, Baguio City","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-11-07","lat":16.411611,"lon":120.593008,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Drive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":463.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":876},{"i":1099,"cid":"24AI0019","pid":"P00821506LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 6)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"SOLID STAR BUILDERS AND CONSTRUCTION SUPPLY","c":48877781.14,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-05-28","lat":16.067695,"lon":120.593204,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 6","dup":[],"run":[1741,1731,1705,1105],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24AI0016 to 24AI0020) cover the same site, together worth PHP 244,317,430.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":498},{"i":1100,"cid":"23AA0148","pid":"P00727043LZ","t":"Construction of Flood Control Structure along Bislak River, Barangay Cabaruan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":29399734.0,"abc":29399735.53,"fy":"2023","sd":"03/29/2023","cd":"2023-08-15","lat":18.252722,"lon":120.593277,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabaruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":877},{"i":1101,"cid":"24CJ0278","pid":"P00825059LZ","t":"Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment B), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-09-19","lat":15.530111,"lon":120.593417,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.05,"wp":[15.53005,120.59292],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[1360,1372,1104],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CJ0273 to 24CJ0278) cover the same site, together worth PHP 441,750,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":5},{"i":1102,"cid":"23AA0392","pid":"P00742252LZ","t":"Construction / Rehabilitation of Drainage Structure within the vicinity ofIlocos Norte College of Arts and Trades (INCAT), Brgy. 3 Nstra. Sra. Del Rosario, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":4949233.07,"abc":4949760.83,"fy":"2023","sd":"04/20/2023","cd":"2023-08-13","lat":18.203994,"lon":120.593518,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"3 Nstra. Sra. Del Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":878},{"i":1103,"cid":"21CH0040","pid":"P00526038LZ","t":"Construction of Slope Protection, Sta. 00+000 - Sta. 0+460 along GPDC, San Jose Gumi, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"Lubao","deo":"Pampanga 2nd District Engineering Office","co":"OMICRON CONSTRUCTION","c":48244588.77,"abc":48999870.69,"fy":"2021","sd":"03/09/2022","cd":"2022-08-24","lat":14.873542,"lon":120.593531,"sm":816,"fm":null,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":460.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":879},{"i":1104,"cid":"24CJ0276","pid":"P00825058LZ","t":"Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment A), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-09-19","lat":15.527233,"lon":120.59395,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.07,"wp":[15.52717,120.59328],"wst":"matched","br":null,"len":null,"ph":"Segment A","dup":[],"run":[1360,1372,1101],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CJ0273 to 24CJ0278) cover the same site, together worth PHP 441,750,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":6},{"i":1105,"cid":"24AI0020","pid":"P00821507LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 7)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48883150.79,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-05-31","lat":16.067247,"lon":120.594108,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 7","dup":[],"run":[1741,1731,1705,1099],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24AI0016 to 24AI0020) cover the same site, together worth PHP 244,317,430.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":499},{"i":1106,"cid":"23CI0067","pid":"P00740635LZ","t":"Construction of Drainage in Brgy. Sto. Cristo, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NES-SAN BUILDERS","c":4881475.05,"abc":4897413.29,"fy":"2023","sd":"03/24/2023","cd":"2023-07-21","lat":15.140447,"lon":120.594279,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Cristo","len":null,"ph":null,"dup":[1107],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,770,580.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1067},{"i":1107,"cid":"23CI0143","pid":"P00740621LZ","t":"Construction of Drainage with Outfall at Brgy. Lourdes Sur East, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"QUANTUMWAYS BUILDERS ROAD CONSTRUCTION","c":4889105.41,"abc":4892793.3,"fy":"2023","sd":"05/22/2023","cd":"2023-07-20","lat":15.140447,"lon":120.594279,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lourdes Sur East","len":null,"ph":null,"dup":[1106],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,770,580.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1046},{"i":1108,"cid":"22CI0125","pid":"P00631253LZ","t":"Construction of Slope Protection with steel Sheet Pile Foundation along Abacan River, Brgy. Balibago, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":24472169.33,"abc":24497833.03,"fy":"2022","sd":"03/24/2022","cd":"2022-10-31","lat":15.157027,"lon":120.594492,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.04,"wp":[15.15676,120.59469],"wst":"matched","br":"Balibago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":880},{"i":1109,"cid":"22CJ0051","pid":"P00630939LZ","t":"Construction of Tarlac City Urban Drainage System (Phase 3), Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":95052418.57,"abc":96500000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-11-12","lat":15.479256,"lon":120.595042,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":881},{"i":1110,"cid":"22CJ0222","pid":"P00640529LZ","t":"Construction of Tarlac City Urban Drainage System, Package 11, Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":48515833.0,"abc":49500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-28","lat":15.480872,"lon":120.595283,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 11","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":882},{"i":1111,"cid":"23A00249","pid":"P00726843LZ","t":"Construction of Quiaoit River Diversion Canal (Cut-Off Channel), Paoay, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":53074990.83,"abc":53075000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-03-07","lat":18.0567,"lon":120.5309,"sm":1099,"fm":1099,"tm":1099,"am":1099,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":1.05,"wp":[18.06584,120.52839],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":883},{"i":1112,"cid":"24AA0105","pid":"P00824638LZ","t":"Construction of Flood Mitigating Structure along Padsan River connecting Barangay 6 Tonoton, Piddig, Ilocos Norte and Barangay San Marcos, Sitio Cabuloan, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":48999653.83,"abc":48999745.89,"fy":"2024","sd":"03/01/2024","cd":"2024-09-27","lat":18.148731,"lon":120.672181,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.26,"wp":[18.14645,120.6718],"wst":"matched","br":"6 Tonoton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":884},{"i":1113,"cid":"22CB0056","pid":"P00620513LZ","t":"Construction of Flood Control Structure at Talisay River, Brgy. Nagwaling (Station 9+412 - Station 9+741) Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"E.R. VENZON CONSTRUCTION / JVN CONSTRUCTION AND TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-12-22","lat":14.639486,"lon":120.531059,"sm":1130,"fm":1130,"tm":null,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.02,"wp":[14.63956,120.5309],"wst":"matched","br":"Nagwaling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":885},{"i":1114,"cid":"24AD0077","pid":"P00843216LZ","t":"Construction of River Wall at Dagman along Tikeng River, Poblacion, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NABANEW CONSTRUCTION AND SUPPLY","c":5688635.44,"abc":5880000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-10-07","lat":17.11248,"lon":120.67303,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":"Tikeng","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":886},{"i":1115,"cid":"21AD0066","pid":"P00525873LZ","t":"Construction of Sugpon Flood Control, Sugpon, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"Sugpon","deo":"Ilocos Sur 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":9799998.61,"abc":9800000.0,"fy":"2021","sd":"10/11/2021","cd":"2022-08-31","lat":16.825868,"lon":120.53108,"sm":1486,"fm":null,"tm":1486,"am":1486,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":887},{"i":1116,"cid":"23A00064","pid":"P00725581LZ","t":"Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Catagtaguen, Banna, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":48249410.43,"abc":48250000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-12-16","lat":17.95888,"lon":120.67305,"sm":154,"fm":154,"tm":154,"am":154,"md":0.0,"ls":"inside","ww":"River Control Structure Along Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Catagtaguen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":888},{"i":1117,"cid":"24DB0067","pid":"P00820867LZ","t":"Construction of Palico RIS Water Management Flood Control Project of Palico River, Lian, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-08-05","lat":14.049497,"lon":120.673108,"sm":774,"fm":774,"tm":774,"am":774,"md":0.0,"ls":"inside","ww":"Palico","wn":"Palico River","wd":0.04,"wp":[14.0498,120.67296],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":889},{"i":1118,"cid":"24A00233","pid":"P00820134LZ","t":"Construction of Flood Mitigation Structure and Drainage System along Cadaanan River, Upstream and Downstream of Cadaanan Bridge, Barangay Balioeg, Banna, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":72374725.65,"abc":72375000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-09-07","lat":17.952852,"lon":120.674077,"sm":154,"fm":154,"tm":154,"am":154,"md":0.0,"ls":"inside","ww":"Cadaanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balioeg","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":890},{"i":1119,"cid":"24CK0035","pid":"P00821291LZ","t":"Rehabilitation of Dike along O'Donnell River, (Downstream of Palublub Bridge, Left Bank), Phase 3, Sta. 0 + 991.76 to Sta. 1 + 489.18, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96492882.96,"abc":96498191.94,"fy":"2024","sd":"02/20/2024","cd":"2024-10-25","lat":15.409806,"lon":120.531186,"sm":327,"fm":327,"tm":327,"am":432,"md":0.05,"ls":"boundary","ww":"O'Donnell","wn":"O' Donnel River","wd":0.13,"wp":[15.40865,120.53133],"wst":"matched","br":null,"len":497.4,"ph":"Phase 3","dup":[],"run":[1007,1138,1178,1206],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CK0033 to 24CK0038) cover the same site, together worth PHP 482,468,808.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":245},{"i":1120,"cid":"22CG0094","pid":"P00632838LZ","t":"Construction of Slope Protection, Barangay Telapayong, Arayat, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"N.T. TULABUT CONSTRUCTION AND SUPPLY","c":4687517.0,"abc":4950000.0,"fy":"2022","sd":"06/10/2022","cd":"2022-09-07","lat":15.188842,"lon":120.674229,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Telapayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":891},{"i":1121,"cid":"24AA0090","pid":"P00820688LZ","t":"Construction of Flood Control Structure along Padsan River, Barangay 21 San Marcos, Sarrat, Ilocos Norte (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":48999571.26,"abc":48999903.35,"fy":"2024","sd":"02/27/2024","cd":"2024-09-24","lat":18.148655,"lon":120.674277,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.28,"wp":[18.14614,120.6738],"wst":"matched","br":"21 San Marcos","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":892},{"i":1122,"cid":"23AI0096","pid":"P00742282LZ","t":"Construction of Flood Control Structure located at Barangay Capulaan, Balungao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":9671787.53,"abc":9800000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-04-27","lat":15.908449,"lon":120.675044,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capulaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":893},{"i":1123,"cid":"23A00065","pid":"P00725582LZ","t":"Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Balioeg, Banna, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":48249997.02,"abc":48250000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-12-01","lat":17.958116,"lon":120.675218,"sm":154,"fm":154,"tm":154,"am":154,"md":0.0,"ls":"inside","ww":"River Control Structure Along Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balioeg","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":894},{"i":1124,"cid":"24CG0091","pid":"P00844759LZ","t":"Construction of Slope Protection at Sapang Balen (Del Carmen-Bulaon Portion), City of San Fernando, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":46549904.52,"abc":49000000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-06","lat":15.069523,"lon":120.675466,"sm":415,"fm":415,"tm":415,"am":415,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":895},{"i":1125,"cid":"24CG0008","pid":"P00839589LZ","t":"Construction of Slope Protection Structure, Telapayong, Arayat, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC.","c":4677654.23,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-29","lat":15.187046,"lon":120.675546,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":896},{"i":1126,"cid":"22A00181","pid":"P00620122LZ","t":"Construction of Dike Extension along Bongo River (Right Bank), Brgy. Tabtabagan, Banna, Ilocos Norte","w":"Construction of Dike","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"VIKING CONSTRUCTION & SUPPLIES / BJMJB CONSTRUCTION & SUPPLY","c":55928505.0,"abc":55928505.0,"fy":"2022","sd":"03/25/2022","cd":"2022-11-30","lat":17.998178,"lon":120.675991,"sm":154,"fm":154,"tm":154,"am":154,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tabtabagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":897},{"i":1127,"cid":"22CG0050","pid":"P00631242LZ","t":"Rehabilitation of Damaged Slope Protection of Sapang Cabalantian Creek, Cabalantian, Bacolor, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"R.S.C. CONSTRUCTION SERVICES","c":18561193.12,"abc":19600000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-07-31","lat":15.013574,"lon":120.676045,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":"Sapang Cabalantian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":898},{"i":1128,"cid":"22CH0069","pid":"P00637783LZ","t":"Construction of Slope Protection along Porac River, Pio Section, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":19769166.53,"abc":19798253.91,"fy":"2022","sd":"04/13/2022","cd":"2022-11-15","lat":15.057364,"lon":120.531352,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.0,"wp":[15.05736,120.53138],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":899},{"i":1129,"cid":"22C00028","pid":"P00630938LZ","t":"Construction of Slope Protection Structure along Porac River, Brgy. Pio, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"NORTHERN BUILDERS","c":241250000.0,"abc":241249381.9,"fy":"2022","sd":"03/07/2022","cd":"2023-03-01","lat":15.057236,"lon":120.531356,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.0,"wp":[15.05725,120.53134],"wst":"matched","br":"Pio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":900},{"i":1130,"cid":"24CA0065","pid":"P00824693LZ","t":"Construction of Flood Mitigation Structure along Orani River, Orani, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48999998.54,"abc":48999999.89,"fy":"2024","sd":"05/20/2024","cd":"2025-05-28","lat":14.79185,"lon":120.53146,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Orani","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":901},{"i":1131,"cid":"22CA0057","pid":"P00632803LZ","t":"Construction of Drainage Canal along Gov. Pascual to River, Orani, Bataan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"AS MACHA CONSTRUCTION AND TRADING","c":14849989.69,"abc":14849997.48,"fy":"2022","sd":"04/04/2022","cd":"2023-01-28","lat":14.80333,"lon":120.53194,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":902},{"i":1132,"cid":"22AI0050","pid":"P00620970LZ","t":"Construction of Flood Control Structure along Banila River, Brgy. Capulaan, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":29345730.44,"abc":29400000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-02-25","lat":15.9092,"lon":120.6761,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":7.39,"wp":[15.91668,120.74464],"wst":"matched","br":"Capulaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":903},{"i":1133,"cid":"24CB0036","pid":"P00820812LZ","t":"Construction of Flood Control Structure along Talisay River (9+087- 9+385), Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-10-10","lat":14.643328,"lon":120.532094,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.02,"wp":[14.64319,120.53224],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1145,1198,799],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CB0036 to 24CB0039) cover the same site, together worth PHP 214,550,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":467},{"i":1134,"cid":"22CB0055","pid":"P00620510LZ","t":"Construction of Flood Control Structure at Talisay River, Brgy. Ala-uli (Station 9+083 - Station 9+412) Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"POLYMER-VIC CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-11-21","lat":14.642069,"lon":120.53227,"sm":1130,"fm":1130,"tm":null,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.03,"wp":[14.64209,120.53197],"wst":"matched","br":"Ala-uli","len":null,"ph":null,"dup":[1135],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":867},{"i":1135,"cid":"23CB0010","pid":"P00726713LZ","t":"Construction of Flood Control Structure along Talisay River, (8+773-9+083), Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-06-26","lat":14.642069,"lon":120.53227,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.03,"wp":[14.64209,120.53197],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1134],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":868},{"i":1136,"cid":"22CA0077","pid":"P00621237LZ","t":"Construction of Flood Control Project in Capitangan River, Abucay, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96499999.81,"fy":"2022","sd":"07/06/2022","cd":"2023-05-02","lat":14.70634,"lon":120.53247,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":"Capitangan","wn":"Capitangan River","wd":32.23,"wp":[14.8412,120.79769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":904},{"i":1137,"cid":"22AI0067","pid":"P00620971LZ","t":"Construction of Flood Control Structure along Banila River, Brgy. Pugaro, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"JHI CONSTRUCTION & SUPPLY","c":48950632.01,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-10-10","lat":15.9086,"lon":120.6764,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":7.36,"wp":[15.91668,120.74464],"wst":"matched","br":"Pugaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":905},{"i":1138,"cid":"24CK0036","pid":"P00821292LZ","t":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 1, Sta. 1+080.00 to Sta. 1+451.91, Capas, Tarlac.","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96500000.0,"abc":96499373.58,"fy":"2024","sd":"02/20/2024","cd":"2024-11-25","lat":15.407797,"lon":120.532625,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.09,"wp":[15.40843,120.53312],"wst":"matched","br":null,"len":371.9,"ph":"Phase 1","dup":[],"run":[1007,1119,1178,1206],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CK0033 to 24CK0038) cover the same site, together worth PHP 482,468,808.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":198},{"i":1139,"cid":"22PA0079","pid":"P00632779LZ","t":"Construction of Salip Flood Control, Barangay Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497900.0,"abc":48999965.06,"fy":"2022","sd":"03/16/2022","cd":"2022-09-27","lat":17.661836,"lon":120.676793,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01016,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":707},{"i":1140,"cid":"22CH0054","pid":"P00621453LZ","t":"Construction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":48844689.26,"abc":48852575.92,"fy":"2022","sd":"04/18/2022","cd":"2022-09-14","lat":14.980226,"lon":120.532709,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.03,"wp":[14.97997,120.53265],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":906},{"i":1141,"cid":"22PA0093","pid":"P00632765LZ","t":"Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":46352378.91,"abc":48999909.19,"fy":"2022","sd":"03/28/2022","cd":"2022-12-08","lat":17.663141,"lon":120.677562,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":907},{"i":1142,"cid":"23AH0070","pid":"P00727088LZ","t":"Construction of Riverbank Protection, Brgy. Lelemaan, Manaoag, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":48996410.44,"abc":49000000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-01-19","lat":16.008706,"lon":120.532908,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lelemaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":908},{"i":1143,"cid":"23AA0257","pid":"P00740512LZ","t":"Construction of Flood Control Structure along Bislak River, Barangay Salsalamagui, Vintar, I Locos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"HEKLER BUILDERS CORP.","c":29399903.6,"abc":29399927.25,"fy":"2023","sd":"03/29/2023","cd":"2023-12-15","lat":18.241592,"lon":120.677651,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salsalamagui","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":909},{"i":1144,"cid":"22AH0072","pid":"P00631087LZ","t":"Construction of Riverbank Protection at Sitio Manggaan, Brgy. Lelemaan, Manaoag, Pangasinan","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"PANGASINAN","mu":"MANAOAG (PANGASINAN)","deo":"Pangasinan 2nd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY","c":14550366.98,"abc":14700000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-07-23","lat":16.008572,"lon":120.532977,"sm":911,"fm":911,"tm":911,"am":911,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lelemaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":910},{"i":1145,"cid":"24CB0037","pid":"P00820811LZ","t":"Construction of Flood Control Structure along Talisay River (8+475 - 8+773), Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"E.R. VENZON CONSTRUCTION / L.R. DE GUZMAN CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-11-15","lat":14.643592,"lon":120.533167,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.01,"wp":[14.6437,120.53312],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1133,1198,799],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CB0036 to 24CB0039) cover the same site, together worth PHP 214,550,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":468},{"i":1146,"cid":"22CK0082","pid":"P00621539LZ","t":"Rehabilitation of Dike along Lucung river, (Malupa section, Left Bank), Concepcion, Tarlac (Sta. 1+637 to Sta. 1+909)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP.","c":37228052.04,"abc":37239610.69,"fy":"2022","sd":"03/24/2022","cd":"2022-10-16","lat":15.3221,"lon":120.6777,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":272.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":911},{"i":1147,"cid":"22CH0053","pid":"P00621457LZ","t":"Construction of Slope Protection along Porac River, Jalung Section, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":48840873.66,"abc":48852088.12,"fy":"2022","sd":"04/13/2022","cd":"2022-10-28","lat":15.067352,"lon":120.533182,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.01,"wp":[15.06741,120.53313],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":912},{"i":1148,"cid":"24CK0027","pid":"P00824708LZ","t":"Rehabilitation of Existing Dike along Lucung River (Malupa Section, Left Bank), Sta. 1+637 to Sta. 1+674 and Sta. 2+196 to Sta. 2+376, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":46749922.54,"abc":46751014.15,"fy":"2024","sd":"02/05/2024","cd":"2024-06-30","lat":15.322063,"lon":120.677839,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":217.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":913},{"i":1149,"cid":"22CI0059","pid":"P00621461LZ","t":"Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+620) to Sta. (-0+870), Mabalacat, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":24311437.71,"abc":24496149.16,"fy":"2022","sd":"03/24/2022","cd":"2022-09-11","lat":15.214361,"lon":120.533186,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.09,"wp":[15.21502,120.53276],"wst":"matched","br":"Macapagal Village","len":null,"ph":null,"dup":[],"run":[1180,1182],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CI0057 to 22CI0059) cover the same site, together worth PHP 72,368,067.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":633},{"i":1150,"cid":"22A00176","pid":"P00621135LZ","t":"Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":211334996.3,"abc":211335000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-10-10","lat":18.244652,"lon":120.678776,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Abkir-Alviar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":914},{"i":1151,"cid":"22AB0086","pid":"P00621593LZ","t":"Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999996.76,"abc":48999996.73,"fy":"2022","sd":"03/25/2022","cd":"2022-12-06","lat":17.94322,"lon":120.67893,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Sinigpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[1176,1177],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AB0085 to 22AB0087) cover the same site, together worth PHP 146,999,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":469},{"i":1152,"cid":"24CA0064","pid":"P00845962LZ","t":"Construction of Flood Control Project along  Puksuan River, Brgy. Puksuan, Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":9899999.72,"abc":9899999.72,"fy":"2024","sd":"07/11/2024","cd":"2024-10-08","lat":14.807899,"lon":120.5333,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Puksuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Puksuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":915},{"i":1153,"cid":"22A00263","pid":"P00621558LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":79130000.0,"abc":80360000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-28","lat":17.943479,"lon":120.678949,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":916},{"i":1154,"cid":"22CI0055","pid":"P00639485LZ","t":"Construction of River Wall along Sacobia River (Downstream of Sacobia Bridge), Brgy. Marcos Village, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":48534502.89,"abc":48998211.85,"fy":"2022","sd":"03/24/2022","cd":"2022-09-24","lat":15.21598,"lon":120.533403,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.03,"wp":[15.21576,120.5336],"wst":"matched","br":"Marcos Village","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":917},{"i":1155,"cid":"22A00262","pid":"P00621552LZ","t":"Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":79130000.0,"abc":80360000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-28","lat":17.943407,"lon":120.67903,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":918},{"i":1156,"cid":"22AD0079","pid":"P00621508LZ","t":"Construction of Atabay Flood Control, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":14699999.73,"abc":14700000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-28","lat":17.1385,"lon":120.5335,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":919},{"i":1157,"cid":"23AD0032","pid":"P00742269LZ","t":"Construction of Brgy. Bessang Flood Control, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":9879986.49,"abc":9900000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-07-02","lat":17.291944,"lon":120.533611,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bessang Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":920},{"i":1158,"cid":"23AA0027","pid":"P00726043LZ","t":"Construction of Flood Control Structure along Padsan River US Sarrat Br., Left Bank, San Marcos, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":39199115.51,"abc":39199899.27,"fy":"2023","sd":"02/13/2023","cd":"2023-06-23","lat":18.14737,"lon":120.679043,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.18,"wp":[18.14579,120.67849],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":921},{"i":1159,"cid":"22PE0093","pid":"P00639451LZ","t":"Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"SABLAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":14688347.0,"abc":14700000.0,"fy":"2022","sd":"09/07/2022","cd":"2023-12-01","lat":16.544339,"lon":120.533664,"sm":1227,"fm":1227,"tm":1227,"am":1227,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":922},{"i":1160,"cid":"22A00281","pid":"P00621603LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Dongdong River (Left Bank), Barangay Acnam, Sitio Saranay, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249999.1,"abc":49000000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.942804,"lon":120.679073,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Acnam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":923},{"i":1161,"cid":"23AB0148","pid":"P00726854LZ","t":"Construction of Flood Control Structure traversing Ilocos Norte-Apayao Road, Upstream & Downstream of Suyo Bridge, Dingras, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAOAY (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"SOLSONA-GANAL CONSTRUCTION & SUPPLY","c":8288961.56,"abc":8299000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-07-11","lat":18.13531,"lon":120.67986,"sm":517,"fm":1099,"tm":517,"am":517,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":12.57,"text":"The record contradicts itself: the title and the pin point to Dingras, Ilocos Norte, but the municipality field names Paoay, Ilocos Norte, 13 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":619},{"i":1162,"cid":"22A00232","pid":"P00621273LZ","t":"Construction of Flood Control Structure along Badoc River, Brgy. Balbaldez, Badoc, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BADOC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499997.09,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-18","lat":17.915698,"lon":120.53374,"sm":103,"fm":103,"tm":103,"am":103,"md":0.0,"ls":"inside","ww":"Badoc","wn":"Badoc River","wd":0.13,"wp":[17.91662,120.53454],"wst":"matched","br":"Balbaldez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":924},{"i":1163,"cid":"22AD0064","pid":"P00620134LZ","t":"Construction of Sorioan River Control Structure, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48999995.79,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-02-15","lat":17.12948,"lon":120.53389,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":"Sorioan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":925},{"i":1164,"cid":"21PA0220","pid":"P00561497LZ","t":"Construction of Gucab - Demet Flood Control, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"La Paz","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48997500.0,"abc":48999808.84,"fy":"2021","sd":"01/07/2022","cd":"2022-07-12","lat":17.66798,"lon":120.680061,"sm":723,"fm":null,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":926},{"i":1165,"cid":"23CA0030","pid":"P00727125LZ","t":"Construction of Flood Control Structure along Orani River (Phase II-AA), Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":49000000.0,"abc":48999999.04,"fy":"2023","sd":"03/13/2023","cd":"2023-10-16","lat":14.793509,"lon":120.534103,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Orani","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":927},{"i":1166,"cid":"23AD0075","pid":"P00737413LZ","t":"Construction of Flood Control Structure, Barangay Bessang, Burgos, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"BURGOS (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"JMCQ CONSTRUCTION AND SUPPLY","c":9598259.55,"abc":9900000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-06-04","lat":17.291389,"lon":120.534444,"sm":259,"fm":259,"tm":259,"am":259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bessang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":928},{"i":1167,"cid":"24CK0024","pid":"P00824707LZ","t":"Rehabilitation of Existing Dike along Parua River (Barangay Santa Rita Section, Right Bank), Package A, Sta. 12+210.40 - Sta. 12+406.75, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":46728726.02,"abc":46748976.2,"fy":"2024","sd":"02/05/2024","cd":"2024-05-13","lat":15.302619,"lon":120.680061,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.18,"wp":[15.30414,120.68068],"wst":"matched","br":"Santa Rita Section","len":196.4,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":929},{"i":1168,"cid":"22CH0059","pid":"P00637782LZ","t":"Construction of Slope Protection along Porac River, Solib Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":19779866.52,"abc":19799967.46,"fy":"2022","sd":"04/13/2022","cd":"2022-09-09","lat":14.9681,"lon":120.5347,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.0,"wp":[14.9681,120.53469],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":930},{"i":1169,"cid":"23PA0104","pid":"P00726375LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144744528.6,"abc":144749907.4,"fy":"2023","sd":"04/14/2023","cd":"2024-04-10","lat":17.642188,"lon":120.680981,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nagtupacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":931},{"i":1170,"cid":"24CH0065","pid":"P00846005LZ","t":"Constuction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"J. LINGAT CONSTRUCTION","c":14842087.89,"abc":14849616.15,"fy":"2024","sd":"03/18/2024","cd":"2024-07-30","lat":14.9806,"lon":120.5348,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.05,"wp":[14.98019,120.53488],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":932},{"i":1171,"cid":"22A00279","pid":"P00621605LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Left Bank), Barangay Barikir, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249999.67,"abc":49000000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.921504,"lon":120.6811,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barikir","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":933},{"i":1172,"cid":"23CH0057","pid":"P00740610LZ","t":"Construction of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":29393302.38,"abc":29399126.19,"fy":"2023","sd":"04/20/2023","cd":"2024-04-09","lat":14.973005,"lon":120.5349,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.03,"wp":[14.97311,120.53519],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":934},{"i":1173,"cid":"22A00280","pid":"P00621606LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249996.9,"abc":49000000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.921381,"lon":120.681142,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barikir","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":935},{"i":1174,"cid":"24AI0147","pid":"P00843203LZ","t":"Construction of Flood Mitigation Structure along Lagasit River, Package A, Balungao - Santa Maria, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":96393183.69,"abc":96500000.0,"fy":"2024","sd":"04/16/2024","cd":"2024-06-30","lat":15.939035,"lon":120.681458,"sm":140,"fm":140,"tm":null,"am":140,"md":0.0,"ls":"inside","ww":"Lagasit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":936},{"i":1175,"cid":"22CK0081","pid":"P00621291LZ","t":"Rehabilitation of Dike along Lucung River, (Malupa Section, Right Bank), Concepcion, Tarlac (Sta. 2+206 to Sta. 2+688)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP.","c":60202410.54,"abc":60215392.55,"fy":"2022","sd":"03/26/2022","cd":"2023-01-05","lat":15.32478,"lon":120.68223,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":482.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":937},{"i":1176,"cid":"22AB0085","pid":"P00621592LZ","t":"Construction of Flood Control Structure along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/29/2022","cd":"2022-12-08","lat":17.94131,"lon":120.6823,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Sinigpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[1151,1177],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AB0085 to 22AB0087) cover the same site, together worth PHP 146,999,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":470},{"i":1177,"cid":"22AB0087","pid":"P00621594LZ","t":"Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-12-05","lat":17.94181,"lon":120.68232,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Sinigpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[1176,1151],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AB0085 to 22AB0087) cover the same site, together worth PHP 146,999,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":471},{"i":1178,"cid":"24CK0037","pid":"P00821293LZ","t":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 2, Sta. 1+451.91 to Sta. 1+823.05, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497531.14,"abc":96499828.21,"fy":"2024","sd":"02/20/2024","cd":"2024-10-25","lat":15.405428,"lon":120.534978,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.09,"wp":[15.40593,120.5356],"wst":"matched","br":null,"len":371.1,"ph":"Phase 2","dup":[],"run":[1007,1119,1138,1206],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CK0033 to 24CK0038) cover the same site, together worth PHP 482,468,808.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":246},{"i":1179,"cid":"22CG0008","pid":"P00620542LZ","t":"Rehabilitation of Flood Control Structure/Slope Protection of Mesalipit Creek, Bacolor, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC.","c":27782198.84,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-07-20","lat":14.991692,"lon":120.682564,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":"Mesalipit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":938},{"i":1180,"cid":"22CI0057","pid":"P00631254LZ","t":"Construction of Riverwall along Sacobia River Brgy. Macapagal Village, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":23752035.93,"abc":24497798.6,"fy":"2022","sd":"02/25/2022","cd":"2022-07-07","lat":15.215746,"lon":120.534987,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.09,"wp":[15.21643,120.5345],"wst":"matched","br":"Macapagal Village","len":null,"ph":null,"dup":[1182,1185],"run":[1182,1149],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 72,335,432.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CI0057 to 22CI0059) cover the same site, together worth PHP 72,368,067.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":119},{"i":1181,"cid":"23AD0048","pid":"P00727081LZ","t":"Construction of Quirino Flood Control, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NABANEW CONSTRUCTION AND SUPPLY","c":19599957.43,"abc":19600000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-12-26","lat":17.13962,"lon":120.68343,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":939},{"i":1182,"cid":"22CI0058","pid":"P00621460LZ","t":"Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+370) to Sta. (-0+620), Mabalacat, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":24304593.61,"abc":24493652.12,"fy":"2022","sd":"03/24/2022","cd":"2022-09-11","lat":15.215746,"lon":120.534987,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.09,"wp":[15.21643,120.5345],"wst":"matched","br":"Macapagal Village","len":null,"ph":null,"dup":[1180,1185],"run":[1180,1149],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 72,335,432.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CI0057 to 22CI0059) cover the same site, together worth PHP 72,368,067.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":120},{"i":1183,"cid":"22PE0072","pid":"P00639446LZ","t":"Construction of Flood Control Structure along Ambalanga River (Below Vital Fianza Jr Residence), Supang, Poblacion, Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"NINETY ONE BUILDERS","c":5289578.4,"abc":5390000.0,"fy":"2022","sd":"07/18/2022","cd":"2022-11-04","lat":16.365829,"lon":120.683674,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Ambalanga","wn":"Ambalanga River","wd":0.02,"wp":[16.36569,120.68384],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":940},{"i":1184,"cid":"24CK0028","pid":"P00824709LZ","t":"Rehabilitation of Existing Dike along Parua River (Balutu Section, Right Bank), Sta. 14+253 to Sta. 14+443, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":46736249.12,"abc":46749159.12,"fy":"2024","sd":"02/05/2024","cd":"2024-05-20","lat":15.301922,"lon":120.684077,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.18,"wp":[15.3035,120.68444],"wst":"matched","br":null,"len":190.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":941},{"i":1185,"cid":"22CI0119","pid":"P00637077LZ","t":"Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village, Sapang Balen Riverwall Sta. (-0+120) to Sta. (-0+370), Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":24278801.96,"abc":24494456.68,"fy":"2022","sd":"05/24/2022","cd":"2022-11-11","lat":15.215746,"lon":120.534987,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.09,"wp":[15.21643,120.5345],"wst":"matched","br":"Macapagal Village","len":null,"ph":null,"dup":[1180,1182],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 72,335,432.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":799},{"i":1186,"cid":"24AI0148","pid":"P00843204LZ","t":"Construction of Flood Mitigation Structure along Lagasit River, Package B, Balungao - Santa Maria, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":96390646.52,"abc":96500000.0,"fy":"2024","sd":"04/16/2024","cd":"2024-06-30","lat":15.938483,"lon":120.684611,"sm":140,"fm":140,"tm":null,"am":140,"md":0.0,"ls":"inside","ww":"Lagasit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":942},{"i":1187,"cid":"24AD0089","pid":"P00838504LZ","t":"Construction of River Wall at Tilek, Suagayan, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"EJIEV CONSTRUCTION SERVICES","c":5688855.8,"abc":5880000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-10-10","lat":17.09436,"lon":120.68479,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":943},{"i":1188,"cid":"22AA0132","pid":"P00621585LZ","t":"Construction of Flood Control Structure Along Laoag River Basin, Brgy. San Marcos, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ALTEC CONSTRUCTION","c":11759084.34,"abc":11759923.14,"fy":"2022","sd":"04/04/2022","cd":"2022-08-03","lat":18.144172,"lon":120.684841,"sm":1429,"fm":1429,"tm":1429,"am":1125,"md":0.06,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Marcos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":944},{"i":1189,"cid":"22PF0025","pid":"P00620809LZ","t":"Construction of Naguey Flood Control Structure, Sta. 5+875 - Sta. 6+475 (L.S), Sta. 4+725 - 5+725 (B.S) along Amburayan River, Atok, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ATOK (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"ALMOND ENGINEERING & CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":51857438.1,"abc":51920860.0,"fy":"2022","sd":"03/08/2022","cd":"2022-10-17","lat":16.600089,"lon":120.685143,"sm":82,"fm":82,"tm":82,"am":82,"md":0.0,"ls":"inside","ww":"Amburayan","wn":"Amburayan River","wd":0.02,"wp":[16.60025,120.68513],"wst":"matched","br":null,"len":1600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":945},{"i":1190,"cid":"22AI0107","pid":"P00620975LZ","t":"Construction of Flood Control Structure along Lagasit River, Brgy. Namagbagan, Sta. Maria, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"SANTA MARIA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":28517854.91,"abc":29400000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-17","lat":15.9392,"lon":120.68556,"sm":1393,"fm":1393,"tm":1393,"am":1393,"md":0.0,"ls":"inside","ww":"Lagasit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Namagbagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":946},{"i":1191,"cid":"23A00066","pid":"P00725596LZ","t":"Construction of Flood Control Structures at BarangayEscoda (Bongo River Tributaries) Marcos, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"MARCOS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249058.58,"abc":48250000.0,"fy":"2023","sd":"03/03/2023","cd":"2024-01-31","lat":18.025905,"lon":120.6859,"sm":935,"fm":935,"tm":null,"am":935,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":947},{"i":1192,"cid":"22AD0094","pid":"P00621510LZ","t":"Construction of Quirino Flood Control, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NABANEW CONSTRUCTION AND SUPPLY","c":19599997.6,"abc":19600000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-30","lat":17.135031,"lon":120.686055,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":948},{"i":1193,"cid":"21P00050","pid":"P00561462LZ","t":"Construction of Naguey Flood Control, Atok, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Atok","deo":"Benguet 2nd District Engineering Office","co":"4RMCONSTRUCTION & SUPPLIES / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":96500000.0,"abc":96493651.0,"fy":"2021","sd":"01/07/2022","cd":"2022-09-03","lat":16.60064,"lon":120.68643,"sm":82,"fm":null,"tm":82,"am":82,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":949},{"i":1194,"cid":"23CH0035","pid":"P00742344LZ","t":"Construction of Slope Protection along Porac River, Brgy. Poblacion Section, Floridablanca","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":29692996.3,"abc":29699731.69,"fy":"2023","sd":"04/05/2023","cd":"2023-09-16","lat":14.97963,"lon":120.53502,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.06,"wp":[14.98019,120.5349],"wst":"matched","br":"Poblacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":950},{"i":1195,"cid":"24CA0055","pid":"P00845964LZ","t":"Construction of Concrete Canal with Concrete Cover and Sidewalk, Brgy. Cailayan, Abucay, Bataan (Phase I)","w":"Construction of Drainage Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"DE JESUS CONSTRUCTION","c":9899999.1,"abc":9899999.1,"fy":"2024","sd":"04/22/2024","cd":"2024-09-19","lat":14.729544,"lon":120.535022,"sm":2,"fm":2,"tm":2,"am":2,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cailayan","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":951},{"i":1196,"cid":"23CH0067","pid":"P00742357LZ","t":"Contruction of Slope Protection along Porac River Paguiruan Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"DMDANAN CONSTRUCTION AND TRADING","c":49489954.9,"abc":49499311.6,"fy":"2023","sd":"05/22/2023","cd":"2023-11-17","lat":14.9911,"lon":120.5352,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.04,"wp":[14.99117,120.53559],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1201,1233,1229],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0065 to 23CH0069) cover the same site, together worth PHP 118,509,602.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":472},{"i":1197,"cid":"22CH0081","pid":"P00639365LZ","t":"Rehabilitation of Canal System of Porac-Gumain RIS (Porac RIS), Guagua, Pampanga","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"SOLFIO P. JACINTO CONSTRUCTION INC.","c":96492456.51,"abc":96499899.11,"fy":"2022","sd":"06/01/2022","cd":"2022-12-05","lat":15.002689,"lon":120.535251,"sm":595,"fm":595,"tm":595,"am":558,"md":0.07,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":952},{"i":1198,"cid":"24CB0038","pid":"P00820810LZ","t":"Construction of Flood Control Structure along Talisay River (8+177 - 8+475), Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"4B CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-10-10","lat":14.642744,"lon":120.535258,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.02,"wp":[14.64293,120.5352],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1133,1145,799],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CB0036 to 24CB0039) cover the same site, together worth PHP 214,550,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":473},{"i":1199,"cid":"21CH0090","pid":"P00526024LZ","t":"Construction of Slope Protection along Porac River, Paguiruan Section,  Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"Floridablanca","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":19594564.38,"abc":19599915.01,"fy":"2021","sd":"03/21/2022","cd":"2022-08-17","lat":14.99121,"lon":120.53526,"sm":558,"fm":null,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.03,"wp":[14.99127,120.53557],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":953},{"i":1200,"cid":"23AD0044","pid":"P00727077LZ","t":"Construction of Poblacion Sur River Control, Barangay Poblacion Sur, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29399992.88,"abc":29400000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-06-24","lat":17.141477,"lon":120.535386,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":"Poblacion Sur","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":954},{"i":1201,"cid":"23CH0065","pid":"P00740618LZ","t":"Construction of Slope Protection along Porac River, Sitio Duat, Pulong Masle, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":19545904.49,"abc":19599287.27,"fy":"2023","sd":"05/08/2023","cd":"2023-07-20","lat":15.008232,"lon":120.535458,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.02,"wp":[15.00809,120.53532],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1196,1233,1229],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0065 to 23CH0069) cover the same site, together worth PHP 118,509,602.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":663},{"i":1202,"cid":"22AD0081","pid":"P00640496LZ","t":"Construction of Nagbukel River Control, Nagbukel, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"NAGBUKEL (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"CZMAC CONSTRUCTION SERVICES","c":19202205.72,"abc":19800000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-08-28","lat":17.451886,"lon":120.535943,"sm":1004,"fm":1004,"tm":1004,"am":1004,"md":0.0,"ls":"inside","ww":"Nagbukel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":955},{"i":1203,"cid":"22CH0083","pid":"P00639358LZ","t":"Construction of Slope Protection and Canal Structure of Porac - Gumain RIS, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC","c":77188819.91,"abc":77199894.84,"fy":"2022","sd":"07/04/2022","cd":"2023-01-19","lat":15.536073,"lon":120.536073,"sm":595,"fm":595,"tm":595,"am":432,"md":56.87,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":56.87,"text":"The pin is 56.9 km outside Guagua, Pampanga, the nearest municipality the record claims. It falls in City of Tarlac, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":119},{"i":1204,"cid":"23CB0028","pid":"P00726714LZ","t":"Construction of Flood Control Structure along Talisay River, (6+369-6+574), Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"JEK TRADING AND CONSTRUCTION / E.R. VENZON CONSTRUCTION","c":34300000.0,"abc":34299504.65,"fy":"2023","sd":"04/24/2023","cd":"2023-11-10","lat":14.658697,"lon":120.536604,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.03,"wp":[14.65871,120.53632],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":956},{"i":1205,"cid":"22CH0040","pid":"P00621455LZ","t":"Construction/Rehabilitation of Slope Protection along Porac River, Poblacion Section, Floridablanca, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC","c":48840963.08,"abc":48852725.9,"fy":"2022","sd":"04/18/2022","cd":"2022-10-14","lat":14.984397,"lon":120.537085,"sm":558,"fm":558,"tm":558,"am":558,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":0.19,"wp":[14.9856,120.53581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":957},{"i":1206,"cid":"24CK0038","pid":"P00821294LZ","t":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 3, Sta. 1+823.05 to Sta. 2+194.05, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":96496366.23,"abc":96499464.69,"fy":"2024","sd":"04/27/2024","cd":"2024-12-16","lat":15.403253,"lon":120.537206,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.17,"wp":[15.40472,120.53751],"wst":"matched","br":null,"len":371.0,"ph":"Phase 3","dup":[],"run":[1007,1119,1138,1178],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CK0033 to 24CK0038) cover the same site, together worth PHP 482,468,808.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":247},{"i":1207,"cid":"23CB0027","pid":"P00726715LZ","t":"Construction of Flood Control Structure along Talisay River, (6+164 - 6+369), Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION","c":34300000.0,"abc":34299204.11,"fy":"2023","sd":"04/24/2023","cd":"2023-12-27","lat":14.660292,"lon":120.537797,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.02,"wp":[14.66043,120.53766],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":958},{"i":1208,"cid":"22A00282","pid":"P00621602LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Dongdong River (Left Bank), Barangay Acnam, Sitio Venus 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249996.51,"abc":49000000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.923724,"lon":120.6867,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Acnam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":959},{"i":1209,"cid":"24CI0067","pid":"P00838419LZ","t":"Construction of Riverwall (Phase I) along Sacobia River, Barangay Calumpang, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":96466323.0,"abc":96470759.6,"fy":"2024","sd":"04/22/2024","cd":"2024-11-16","lat":15.21435,"lon":120.5378,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.33,"wp":[15.21724,120.53692],"wst":"matched","br":"Calumpang","len":null,"ph":"Phase I","dup":[1210],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,944,284.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":708},{"i":1210,"cid":"24CI0068","pid":"P00838420LZ","t":"Construction of Riverwall (Phase II) along Sacobia River, Barangay Calumpang, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"EDFROBON CONSTRUCTION SERVICES INCORPORATED","c":96477961.31,"abc":96486069.79,"fy":"2024","sd":"04/22/2024","cd":"2024-11-16","lat":15.21435,"lon":120.5378,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":0.33,"wp":[15.21724,120.53692],"wst":"matched","br":"Calumpang","len":null,"ph":"Phase II","dup":[1209],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,944,284.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":709},{"i":1211,"cid":"24AD0075","pid":"P00823301LZ","t":"Construction of Sorioan Flood Control Structure, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48249964.94,"abc":49000000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-11-15","lat":17.12955,"lon":120.53806,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":960},{"i":1212,"cid":"22CH0052","pid":"P00637778LZ","t":"Construciton of Drainage Canal, Brgy. San Pablo 2nd, Lubao, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":4791069.16,"abc":4949950.12,"fy":"2022","sd":"04/13/2022","cd":"2022-07-05","lat":14.921436,"lon":120.538196,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pablo 2nd","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":961},{"i":1213,"cid":"24CA0084","pid":"P00845960LZ","t":"Construction of Flood Control Project along Sapang Kastila Capitangan, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ABUCAY (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":9899999.8,"abc":9899999.8,"fy":"2024","sd":"06/27/2024","cd":"2024-09-19","lat":14.708654,"lon":120.538315,"sm":2,"fm":2,"tm":null,"am":2,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":962},{"i":1214,"cid":"22CJ0108","pid":"P00637784LZ","t":"Flood Control Structure Along Tarlac River Control Right Dike, Colibangbang-Nancamarinan Section, Paniqui, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"BIG BERTHA CONSTRUCTION & DEVELOPMENT","c":33950858.49,"abc":34300000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-10","lat":15.651416,"lon":120.538806,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.45,"wp":[15.64924,120.53524],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":963},{"i":1215,"cid":"22CK0101","pid":"P00639369LZ","t":"Rehabilitation of Dike along Lucung River, Sta. (-)6+ 690 to Sta. (-)6+310 (Brgy. San Rafael Section, Right Bank), Bamban, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"BAMBAN (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94489688.9,"abc":96499727.17,"fy":"2022","sd":"03/26/2022","cd":"2022-11-27","lat":15.328142,"lon":120.613603,"sm":141,"fm":141,"tm":141,"am":448,"md":0.6,"ls":"boundary","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Rafael Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":964},{"i":1216,"cid":"24A00453","pid":"P00823278LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 2, Binalonan -Laoac, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":48249942.73,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-01-12","lat":16.0434,"lon":120.5394,"sm":205,"fm":205,"tm":null,"am":750,"md":2.32,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[1217,1218],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 144,749,564.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":667},{"i":1217,"cid":"24A00454","pid":"P00823280LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 3, Binalonan -Laoac, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48249696.41,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-12-12","lat":16.0434,"lon":120.5394,"sm":205,"fm":205,"tm":null,"am":750,"md":2.32,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[1216,1218],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 144,749,564.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":668},{"i":1218,"cid":"24A00455","pid":"P00823282LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 4, Binalonan -Laoac, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48249924.4,"abc":48250000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-12-10","lat":16.0434,"lon":120.5394,"sm":205,"fm":205,"tm":null,"am":750,"md":2.32,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 4","dup":[1216,1217],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 144,749,564.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":669},{"i":1219,"cid":"25CJ0124","pid":"P00921064LZ","t":"Construction of Slope Protection Structure along Buenavista Creek at TASMORIS, Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"BIG BERTHA CONSTRUCTION & DEVELOPMENT","c":14229719.67,"abc":14700000.0,"fy":"2025","sd":"01/27/2025","cd":"2025-05-22","lat":15.427456,"lon":120.613964,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Buenavista","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":965},{"i":1220,"cid":"22CK0056","pid":"P00620195LZ","t":"Rehabilitation of Existing Dike along Lucung River (San Rafael Section, Right Bank), Sta. 8+585 to Sta. 8+985, Bamban, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"BAMBAN (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"B.P. CRUZ BUILDERS AND TRADING","c":57734172.99,"abc":57899105.79,"fy":"2022","sd":"02/16/2022","cd":"2022-08-02","lat":15.328742,"lon":120.614122,"sm":141,"fm":141,"tm":141,"am":448,"md":0.68,"ls":"boundary","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":966},{"i":1221,"cid":"22PD0021","pid":"P00620994LZ","t":"Construction of Flood Mitigation Facility/Drainage System along Loakan Airport, Sta. 0+000 - Sta. 0+815, Baguio City","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"A.R.J. CIVIL ENGINEERING CONSTRUCTION","c":16673974.44,"abc":17640000.0,"fy":"2022","sd":"03/13/2022","cd":"2022-10-13","lat":16.375272,"lon":120.6143,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":815.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":967},{"i":1222,"cid":"23CI0118","pid":"P00742142LZ","t":"Construction/Repair of Reinforced Concrete Slope Protection Structure along Sapangbalen Creek from Brgy. San Ildefonso to Brgy. Sta. Maria, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING / FRAMECON BUILDERS","c":69214730.8,"abc":69286359.4,"fy":"2023","sd":"05/16/2023","cd":"2023-11-11","lat":15.256472,"lon":120.68766,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":8.21,"wp":[15.31687,120.64327],"wst":"matched","br":"San Ildefonso","len":null,"ph":null,"dup":[1225,1228],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,734,658.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":120},{"i":1223,"cid":"22CI0002","pid":"P00632853LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Quitangil Creek, Station 15+169 to Station 15+887 (R/D), Barangay Mawaque, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":19588065.3,"abc":19597072.83,"fy":"2022","sd":"02/08/2022","cd":"2022-07-04","lat":15.207726,"lon":120.614983,"sm":840,"fm":840,"tm":840,"am":860,"md":0.01,"ls":"boundary","ww":"Quitangil","wn":"Quitangil Creek","wd":2.04,"wp":[15.2231,120.60453],"wst":"matched","br":"Mawaque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":968},{"i":1224,"cid":"22CI0013","pid":"P00620176LZ","t":"Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Tabun to Capaya, Angeles City, Pampanga - Sta. 1+949 - Sta. 2+699","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":55968336.61,"abc":56838169.33,"fy":"2022","sd":"02/25/2022","cd":"2022-09-11","lat":15.154091,"lon":120.615143,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.01,"wp":[15.15415,120.61526],"wst":"matched","br":"Tabun","len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":969},{"i":1225,"cid":"23CI0132","pid":"P00742365LZ","t":"Construction of Reinforced Concrete Slope Protection along Sapang Balen River, Brgy. Sta. Maria, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19721987.26,"abc":19785527.99,"fy":"2023","sd":"05/24/2023","cd":"2023-09-10","lat":15.256472,"lon":120.68766,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":8.21,"wp":[15.31687,120.64327],"wst":"matched","br":"Sta. Maria","len":null,"ph":null,"dup":[1222,1228],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,734,658.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":213},{"i":1226,"cid":"22PF0088","pid":"P00639459LZ","t":"Construction of Flood Control Structure at Besil, Tublay Central, Tublay, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"TUBLAY (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"TRIBAL MOVERS CONSTRUCTION","c":9789992.93,"abc":9800000.0,"fy":"2022","sd":"06/14/2022","cd":"2022-12-22","lat":16.526482,"lon":120.615192,"sm":1593,"fm":1593,"tm":1593,"am":1593,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":970},{"i":1227,"cid":"24A00493","pid":"P00824800LZ","t":"Construction of Flood Control Riverbank Structure along Agno and Allied Rivers, Alcala, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"ALCALA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96499995.51,"abc":96500000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-31","lat":15.854602,"lon":120.539423,"sm":24,"fm":24,"tm":24,"am":24,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":971},{"i":1228,"cid":"24CI0069","pid":"P00844764LZ","t":"Construction of Drainage at Sitio Cabio Bakal, Brgy. Sapalibutad, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":9797939.97,"abc":9799337.71,"fy":"2024","sd":"04/02/2024","cd":"2024-08-27","lat":15.256472,"lon":120.68766,"sm":61,"fm":61,"tm":61,"am":860,"md":9.76,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapalibutad","len":null,"ph":null,"dup":[1222,1225],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":9.76,"text":"The pin is 9.8 km outside Angeles City, Pampanga, the nearest municipality the record claims. It falls in Magalang, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.25,"value":2,"text":"2 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 98,734,658.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":121},{"i":1229,"cid":"23CH0069","pid":"P00742353LZ","t":"Construction of Slope Protection along Porac River, Palat Section (Phase II), Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"SIX SILVERS CONSTRUCTION AND DEVELOPMENT  CORP","c":24734901.6,"abc":24749084.09,"fy":"2023","sd":"05/22/2023","cd":"2023-10-18","lat":15.03831,"lon":120.53944,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":1.94,"wp":[15.02913,120.52413],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[1201,1196,1233],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0065 to 23CH0069) cover the same site, together worth PHP 118,509,602.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":634},{"i":1230,"cid":"24CI0010","pid":"P00838531LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along (L/S) Sapangbalen Creek, Downstream of Barangay San Ildefonso, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TONKA CONSTRUCTION","c":48971773.59,"abc":48975379.79,"fy":"2024","sd":"04/22/2024","cd":"2024-09-11","lat":15.25647,"lon":120.6877,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":8.22,"wp":[15.31687,120.64327],"wst":"matched","br":"San Ildefonso","len":null,"ph":null,"dup":[1232,1234],"run":[1232,1234],"cl":[],"L":"field","s":52,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,976,673.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0010 to 24CI0012) cover the same site, together worth PHP 212,976,673.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":85},{"i":1231,"cid":"21PF0030","pid":"P00525911LZ","t":"Construction of Kapangan Flood Control Sta. 8+241 - 8+374 (R.S.), Sta. 8+243 - 8+374 (L.S.),Kapangan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Kapangan","deo":"Benguet 2nd District Engineering Office","co":"FAMILY CIRCLE CONSTRUCTION","c":11489414.45,"abc":11649260.0,"fy":"2021","sd":"03/13/2022","cd":"2022-12-02","lat":16.573964,"lon":120.615931,"sm":698,"fm":null,"tm":698,"am":698,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":264.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":972},{"i":1232,"cid":"24CI0011","pid":"P00838358LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along (R/S) Sapangbalen Creek (Downstream), Barangay San Ildefonso, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":86821821.41,"abc":86836843.23,"fy":"2024","sd":"02/16/2024","cd":"2024-05-20","lat":15.25647,"lon":120.6877,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":8.22,"wp":[15.31687,120.64327],"wst":"matched","br":"San Ildefonso","len":null,"ph":null,"dup":[1230,1234],"run":[1230,1234],"cl":[],"L":"field","s":58,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,976,673.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0010 to 24CI0012) cover the same site, together worth PHP 212,976,673.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":43},{"i":1233,"cid":"23CH0068","pid":"P00742352LZ","t":"Construction of Slope Protection along Porac River, Palat Section (Phase I), Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"SIX SILVERS CONSTRUCTION AND DEVELOPMENT  CORP","c":24738841.23,"abc":24749108.27,"fy":"2023","sd":"05/22/2023","cd":"2023-10-18","lat":15.03926,"lon":120.5395,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":"Porac","wn":"Porac River","wd":1.9,"wp":[15.05262,120.52836],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[1201,1196,1229],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CH0065 to 23CH0069) cover the same site, together worth PHP 118,509,602.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":635},{"i":1234,"cid":"24CI0012","pid":"P00838362LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Sapang Balen Creek, Barangay San Ildefonso, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":77183078.33,"abc":77186570.48,"fy":"2024","sd":"02/16/2024","cd":"2024-05-20","lat":15.25647,"lon":120.6877,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":8.22,"wp":[15.31687,120.64327],"wst":"matched","br":"San Ildefonso","len":null,"ph":null,"dup":[1230,1232],"run":[1230,1232],"cl":[],"L":"field","s":57,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 212,976,673.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0010 to 24CI0012) cover the same site, together worth PHP 212,976,673.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":61},{"i":1235,"cid":"22CK0097","pid":"P00639371LZ","t":"Rehabilitation of Dike along Parua River, Sta.6+675 to Sta.7+119 (Brgy. San Francisco Section, Left Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94533425.98,"abc":96499429.74,"fy":"2022","sd":"03/26/2022","cd":"2022-09-25","lat":15.2856,"lon":120.616,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.12,"wp":[15.28478,120.61677],"wst":"matched","br":"San Francisco Section","len":444.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":973},{"i":1236,"cid":"22CJ0192","pid":"P00640528LZ","t":"Construction of Slope Protection along Tarlac River Control (Right Dike), Colibangbang Section (Package A), Colibangbang, Paniqui, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / RCUBE ENGINEERING SERVICES","c":48511634.63,"abc":49500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-09-24","lat":15.636434,"lon":120.539669,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.45,"wp":[15.6377,120.53565],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":974},{"i":1237,"cid":"22A00283","pid":"P00621604LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Dongdong River (Right Bank), Barangay Acnam, Sitio Venus 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249996.92,"abc":49000000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.923811,"lon":120.687932,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Acnam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":975},{"i":1238,"cid":"23DB0118","pid":"P00742385LZ","t":"Construction of Covered Canal, Brgy. Natipuan, Nasugbu, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"NASUGBU (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":4255760.0,"abc":4255760.0,"fy":"2023","sd":"04/19/2023","cd":"2023-07-21","lat":14.119808,"lon":120.61635,"sm":1014,"fm":1014,"tm":1014,"am":1014,"md":0.0,"ls":"inside","ww":"Covered","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Natipuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":976},{"i":1239,"cid":"23CI0097","pid":"P00727141LZ","t":"Repair/Improvement of Reinforced Concrete Slope Protection along Sapang Balen Creek, Sitio Pitabacan, Brgy. San Ildefonso, Magalang, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NEZIAH BUILDERS AND TRADING CORP.","c":26256800.55,"abc":26456586.43,"fy":"2023","sd":"04/25/2023","cd":"2023-07-23","lat":15.256358,"lon":120.688036,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":8.25,"wp":[15.31687,120.64327],"wst":"matched","br":"San Ildefonso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":977},{"i":1240,"cid":"23AA0064","pid":"P00737409LZ","t":"Rehabilitation of Drainage System, Barangay 14 San Gabriel II, Bacarra, Ilocos Norte","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ALTHEA CONSTRUCTION","c":4949912.02,"abc":4949912.17,"fy":"2023","sd":"02/13/2023","cd":"2023-06-19","lat":18.253578,"lon":120.617172,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"14 San Gabriel II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":978},{"i":1241,"cid":"23CJ0003","pid":"P00726197LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Brillante-Rang-Ayan Section (Package G), Rang-Ayan, Paniqui, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48141038.91,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-18","lat":15.636569,"lon":120.539725,"sm":1092,"fm":315,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.45,"wp":[15.63784,120.5357],"wst":"matched","br":null,"len":null,"ph":"Package G","dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":7.52,"text":"The record contradicts itself: the title and the pin point to Paniqui, Tarlac, but the municipality field names Camiling, Tarlac, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":533},{"i":1242,"cid":"22PA0088","pid":"P00632773LZ","t":"Construction of Poblacion Flood Control Structure (Phase 2), Barangay Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497500.0,"abc":48999959.12,"fy":"2022","sd":"03/28/2022","cd":"2022-10-09","lat":17.670799,"lon":120.688261,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":710},{"i":1243,"cid":"23CJ0006","pid":"P00736619LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"J.H.R. ENTERPRISES","c":47530569.42,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-05-24","lat":15.636389,"lon":120.539725,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.46,"wp":[15.63767,120.53564],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":979},{"i":1244,"cid":"23CI0128","pid":"P00740630LZ","t":"Construction of Slope Protection Leoncia, Brgy. Sto. Domingo, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":21061809.75,"abc":21063826.67,"fy":"2023","sd":"05/16/2023","cd":"2023-08-13","lat":15.1446,"lon":120.6177,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo","len":null,"ph":null,"dup":[1246],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 25,949,743.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":982},{"i":1245,"cid":"18C00035","pid":"P00222127LZ","t":"Almacen River Improvement Project, Hermosa and Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":null,"deo":"Bataan 1st District Engineering Office","co":"TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC","c":136302210.2,"abc":143841300.0,"fy":"2018","sd":"02/26/2018","cd":"2023-08-31","lat":14.82,"lon":120.54,"sm":null,"fm":null,"tm":null,"am":1040,"md":null,"ls":"unknown","ww":"Almacen","wn":"Alamacen River","wd":0.18,"wp":[14.82144,120.54082],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":376},{"i":1246,"cid":"23CI0137","pid":"P00740634LZ","t":"Construction of Slope Protection at Brgy. San Nicholas, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":4887932.85,"abc":4898988.19,"fy":"2023","sd":"05/22/2023","cd":"2023-07-20","lat":15.1446,"lon":120.6177,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicholas","len":null,"ph":null,"dup":[1244],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 25,949,743.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1047},{"i":1247,"cid":"23CI0063","pid":"P00740632LZ","t":"Construction of Drainage along Brgy. Capaya, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":4851646.26,"abc":4899261.31,"fy":"2023","sd":"04/03/2023","cd":"2023-06-01","lat":15.14459,"lon":120.617745,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":980},{"i":1248,"cid":"23CI0125","pid":"P00740366LZ","t":"Construction of Slope Protection along Alasas Creek, Barangay San Pedro II, Barangay Sta. Cruz and Barangay San Agustin, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":67419722.43,"abc":67530313.95,"fy":"2023","sd":"05/24/2023","cd":"2023-11-19","lat":15.219318,"lon":120.68903,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Alasas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":981},{"i":1249,"cid":"22PA0089","pid":"P00632774LZ","t":"Construction of Poblacion Flood Control Structure (Phase 3), Barangay Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497500.0,"abc":48999950.92,"fy":"2022","sd":"03/30/2022","cd":"2022-11-10","lat":17.673113,"lon":120.689375,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":711},{"i":1250,"cid":"21EB0139","pid":"P00561806LZ","t":"Construction of Flood Control, Brgy. San Luis, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Mamburao","deo":"Mindoro Occidental District Engineering Office","co":"ORIENT STAR CONSTRUCTION, INC. (FORMERLY: ORIENT S","c":2450991.9,"abc":2970000.0,"fy":"2021","sd":"04/08/2022","cd":"2022-10-24","lat":13.255189,"lon":120.618106,"sm":908,"fm":null,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":982},{"i":1251,"cid":"24A00008","pid":"P00824830LZ","t":"Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":157294568.6,"abc":157295000.0,"fy":"2024","sd":"02/26/2024","cd":"2025-01-07","lat":17.140363,"lon":120.6894,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":0.32,"wp":[17.13886,120.68681],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":983},{"i":1252,"cid":"22CA0014","pid":"P00632805LZ","t":"Construction of Drainage Canal, Barangay Lalawigan, Samal, Bataan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BATAAN","mu":"SAMAL (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":9899999.99,"abc":9899999.99,"fy":"2022","sd":"02/17/2022","cd":"2022-07-14","lat":14.783324,"lon":120.540744,"sm":1246,"fm":1246,"tm":1246,"am":1246,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lalawigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":984},{"i":1253,"cid":"22PA0099","pid":"P00632770LZ","t":"Construction of Mudeng Flood Control Structure (Phase 3), Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49497500.0,"abc":48999905.92,"fy":"2022","sd":"05/24/2022","cd":"2022-12-05","lat":17.627929,"lon":120.618224,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01016,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":712},{"i":1254,"cid":"22DB0021","pid":"P00620248LZ","t":"Construction of Riverbank Protection along Palico River, Nasugbu, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"NASUGBU (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-11-18","lat":14.045285,"lon":120.689476,"sm":1014,"fm":1014,"tm":1014,"am":774,"md":0.0,"ls":"inside","ww":"Palico","wn":"Palico River","wd":0.03,"wp":[14.04502,120.68956],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":985},{"i":1255,"cid":"22CI0115","pid":"P00621459LZ","t":"Construction of Slope Protection along Sapangbato River Sta. 0+649 to Sta. 1+149, Barangay Margot, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NES-SAN BUILDERS","c":24482452.91,"abc":24498331.34,"fy":"2022","sd":"03/24/2022","cd":"2022-10-06","lat":15.166738,"lon":120.541358,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Sapangbato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Margot","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":986},{"i":1256,"cid":"24AA0201","pid":"P00838481LZ","t":"Construction of Drainage, Barangay 12, Bacarra, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"CAMBONG-BUILDERS INDUSTRIAL FACILITIES CONSTRUCTION","c":4899380.88,"abc":4899504.94,"fy":"2024","sd":"02/16/2024","cd":"2024-05-07","lat":18.24995,"lon":120.618319,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"12","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":987},{"i":1257,"cid":"24EB0076","pid":"P00824747LZ","t":"Construction of Protection Dike at Barangay Talabaan, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KGB ENGINEERING AND CONSTRUCTION","c":4870149.83,"abc":4900000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-05-21","lat":13.152207,"lon":120.689605,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talabaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":988},{"i":1258,"cid":"23CJ0073","pid":"P00740369LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation Along Tarlac River Control Right Dike, Colibangbang Section (Package H), Barangay Colibangbang, Paniqui, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":77199671.49,"abc":77200000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-11-16","lat":15.634356,"lon":120.541458,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along Tarlac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Colibangbang","len":null,"ph":"Package H","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":989},{"i":1259,"cid":"22AB0098","pid":"P00621610LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.940595,"lon":120.6902,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.02,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":990},{"i":1260,"cid":"23CB0054","pid":"P00742316LZ","t":"Construction of Concrete Revetment along Cupang West Creek, Barangay Cupang West, Balanga City, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"VF CONSTRUCTION","c":6784428.58,"abc":6929955.1,"fy":"2023","sd":"04/05/2023","cd":"2023-07-05","lat":14.670832,"lon":120.541779,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Cupang West","wn":"Cupang West Creek","wd":0.28,"wp":[14.67326,120.54254],"wst":"matched","br":"Cupang West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":991},{"i":1261,"cid":"24AA0075","pid":"P00820672LZ","t":"Construction of Flood Control Structure along Barangay Buyon and Barangay Pasiocan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":29399860.43,"abc":29399874.94,"fy":"2024","sd":"02/12/2024","cd":"2024-04-16","lat":18.243636,"lon":120.618333,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buyon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":992},{"i":1262,"cid":"22CG0129","pid":"P00639483LZ","t":"Construction of Sagrada Concrete Sea Wall Protection, Barangay Sagrada, Masantol, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MASANTOL (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"N-22 CONSTRUCTION AND TRADING","c":18541526.13,"abc":19600000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-08-17","lat":14.836959,"lon":120.690562,"sm":945,"fm":945,"tm":945,"am":945,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sagrada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":993},{"i":1263,"cid":"22AD0082","pid":"P00640499LZ","t":"Construction of Sugpon River Control, Sugpon, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SUGPON (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":19799998.32,"abc":19800000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-08-29","lat":16.78948,"lon":120.541943,"sm":1486,"fm":1486,"tm":1486,"am":1486,"md":0.0,"ls":"inside","ww":"Sugpon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":994},{"i":1264,"cid":"22CI0010","pid":"P00631259LZ","t":"Construction of Slope Protection Structure along Quitangil Creek, Sta. 26+880 - Sta. 28+699 (R/D), Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"L.S.D.  CONSTRUCTION & SUPPLIES / PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION","c":47450440.65,"abc":48996557.84,"fy":"2022","sd":"02/08/2022","cd":"2022-10-01","lat":15.208369,"lon":120.618364,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.18,"wp":[15.22493,120.60731],"wst":"matched","br":null,"len":1819.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":995},{"i":1265,"cid":"22PE0001","pid":"P00620998LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11 (Mambolo Bridge), Poblacion, Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"GSIXTY CONSTRUCTION SERVICES","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"05/10/2022","cd":"2023-03-15","lat":16.383446,"lon":120.690932,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":3.6,"wp":[16.36788,120.72046],"wst":"matched","br":null,"len":null,"ph":"Section 11","dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.6,"text":"The title names Agno, which OpenStreetMap maps through the stated municipality, but the pin is 3.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":400},{"i":1266,"cid":"21CJ0007","pid":"P00526052LZ","t":"Rehabilitation of Flood Control Structures along Tarlac River Control Left Dike, Sembrano-Sta. Lucia Section (Phase III), Gerona, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"Gerona","deo":"Tarlac District Engineering Office","co":"ARCONIC INC.","c":13967566.61,"abc":14700000.0,"fy":"2021","sd":"03/28/2022","cd":"2022-07-24","lat":15.613498,"lon":120.542307,"sm":580,"fm":null,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.05,"wp":[15.61358,120.54279],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":996},{"i":1267,"cid":"23A00141","pid":"P00725583LZ","t":"Construction of Flood Control Structure Barangay Camandingan, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":11579999.2,"abc":11580000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-07-11","lat":18.07105,"lon":120.61883,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camandingan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":997},{"i":1268,"cid":"23CI0025","pid":"P00726184LZ","t":"Construction of Flood Mitigation Structure along Quitangil River, Sta. 8+750 - Sta. 10+658 (R/S), San Agustin, Magalang, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":48940091.64,"abc":48993495.02,"fy":"2023","sd":"03/20/2023","cd":"2023-09-15","lat":15.232769,"lon":120.691127,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.28,"wp":[15.23392,120.68883],"wst":"matched","br":null,"len":1908.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":998},{"i":1269,"cid":"22CI0128","pid":"P00637076LZ","t":"Construction of Slope Protection along Sapangbato River, Sta. 1+149 to Sta. 1+649, Barangay Margot, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":24475221.98,"abc":24498017.95,"fy":"2022","sd":"05/24/2022","cd":"2022-11-11","lat":15.165975,"lon":120.543229,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Sapangbato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Margot","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":999},{"i":1270,"cid":"22PA0337","pid":"P00639320LZ","t":"Construction of Flood Control Structure, Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / RM30 PSG CONSTRUCTION CORPORATION","c":95238758.44,"abc":96499892.57,"fy":"2022","sd":"12/28/2022","cd":"2023-09-29","lat":17.627037,"lon":120.619805,"sm":723,"fm":723,"tm":723,"am":150,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1000},{"i":1271,"cid":"23CG0221","pid":"P00742340LZ","t":"Construction of Slope Protection in San Fernando City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":9602952.08,"abc":9900000.0,"fy":"2023","sd":"07/05/2023","cd":"2023-12-28","lat":15.03315,"lon":120.69163,"sm":415,"fm":415,"tm":null,"am":415,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1001},{"i":1272,"cid":"24PA0060","pid":"P00823319LZ","t":"Construction of Buli Flood Control Structure, Buli, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96497500.15,"abc":96500000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-16","lat":17.67493,"lon":120.692,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1002},{"i":1273,"cid":"24CH0074","pid":"P00848617LZ","t":"Construction of Bank Protection Works at Joven Street, Brgy. Babo Sacan, Porac, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"V. TRILLANA BUILDERS & TRADING","c":4945000.0,"abc":4949467.73,"fy":"2024","sd":"04/08/2024","cd":"2024-05-22","lat":15.0667,"lon":120.54349,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Babo Sacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1003},{"i":1274,"cid":"24CI0076","pid":"P00846008LZ","t":"Construction of Slope Protection in Brgy. Sto. Domingo, Angeles City Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":9885415.68,"abc":9888296.92,"fy":"2024","sd":"04/02/2024","cd":"2024-07-27","lat":15.149891,"lon":120.620118,"sm":61,"fm":61,"tm":null,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1004},{"i":1275,"cid":"24CB0064","pid":"P00824695LZ","t":"Construction of Flood Control Structure along Talisay River (3+552- 3+677), Balanga City, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"CITY OF BALANGA (CAPITAL) (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"POLYMER-VIC CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"05/14/2024","cd":"2025-02-13","lat":14.675592,"lon":120.5436,"sm":366,"fm":366,"tm":366,"am":366,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.03,"wp":[14.67564,120.54385],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1005},{"i":1276,"cid":"22PA0085","pid":"P00632772LZ","t":"Construction of Patagui Flood Control, Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497515.89,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-08","lat":17.677199,"lon":120.692428,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":713},{"i":1277,"cid":"23AI0012","pid":"P00726054LZ","t":"Construction of Flood Control Structure along Tagamusing River, Sta. 0 + 000 - Sta. 1 + 266, Barangay Mangcasuy, Binalonan, Pangasinan (Package 1)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48900255.04,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-06","lat":16.07806,"lon":120.6208,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Tagamusing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangcasuy","len":1266.0,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1006},{"i":1278,"cid":"22CJ0183","pid":"P00621282LZ","t":"Construction of Slope Protection Structure along Moriones - Tarlac River Control (Package A), Balanti Section, Balanti, Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. / GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-12","lat":15.455914,"lon":120.544308,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":2.86,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[1361,1373],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0183 to 22CJ0185) cover the same site, together worth PHP 280,815,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":317},{"i":1279,"cid":"22PA0211","pid":"P00637061LZ","t":"Construction of Barbarsik Creek Flood Control, Buli, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48997500.0,"abc":48999712.6,"fy":"2022","sd":"07/20/2022","cd":"2022-12-22","lat":17.683211,"lon":120.692986,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":"Barbarsik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1007},{"i":1280,"cid":"24AI0060","pid":"P00824660LZ","t":"Construction of Flood Control Structure along Mitura River, Brgy. Calepaan, Asingan, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"ASINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":29354074.45,"abc":29400000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-05-24","lat":16.0059,"lon":120.6216,"sm":77,"fm":77,"tm":77,"am":77,"md":0.0,"ls":"inside","ww":"Mitura","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calepaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1008},{"i":1281,"cid":"22PA0338","pid":"P00639319LZ","t":"Construction of Flood Control Structure, Barangay Isit, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":94135771.11,"abc":96499900.75,"fy":"2022","sd":"12/28/2022","cd":"2023-01-30","lat":17.646801,"lon":120.693388,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Isit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1009},{"i":1282,"cid":"24AA0104","pid":"P00824637LZ","t":"Construction of Flood Mitigating Structure (River Wall Protection Upstream and Downstream), Barangay San Pedro, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4899952.42,"abc":4899955.25,"fy":"2024","sd":"03/04/2024","cd":"2024-04-19","lat":18.090289,"lon":120.621914,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1010},{"i":1283,"cid":"23CH0079","pid":"P00727307LZ","t":"Construction of Flood Control Structure, Gumain-Porac River at Lubao and Floridablanca, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"FLORIDABLANCA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION / PENTAGON INDUSTRIAL DEVELOPMENT & CONSTRUCTION CO.","c":96493125.05,"abc":96498519.09,"fy":"2023","sd":"06/14/2023","cd":"2024-01-09","lat":14.92731,"lon":120.54465,"sm":558,"fm":558,"tm":null,"am":816,"md":2.52,"ls":"adjacent","ww":"Gumain-Porac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1011},{"i":1284,"cid":"22AA0142","pid":"P00639414LZ","t":"Construction of Flood Control Structure at Barangay 18,17,14,13,10,9,8,7,3,2 Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"REMIGIO GENERAL CONSTRUCTION","c":24499951.39,"abc":24499953.37,"fy":"2022","sd":"04/04/2022","cd":"2022-12-28","lat":18.251423,"lon":120.621935,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"18","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1012},{"i":1285,"cid":"22AI0057","pid":"P00620976LZ","t":"Construction of Flood Control Structure along Lagasit River, Brgy. San Joaquin, Balungao, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":39153721.46,"abc":39200000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-03-15","lat":15.9339,"lon":120.6936,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Lagasit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1013},{"i":1286,"cid":"24A00349","pid":"P00843206LZ","t":"Construction of Flood Mitigation Structure along Sinucalan River, Barangay Camantiles, Urdaneta, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":192999802.9,"abc":193000000.0,"fy":"2024","sd":"06/24/2024","cd":"2024-11-11","lat":15.9895,"lon":120.5455,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Sinucalan","wn":"Sinocalan River","wd":1.19,"wp":[15.98625,120.5349],"wst":"matched","br":"Camantiles","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1014},{"i":1287,"cid":"22CI0089","pid":"P00631252LZ","t":"Construction of Drainage Canal along Arayat Magalang Mabalacat Road","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NES-SAN BUILDERS","c":14680755.8,"abc":14683287.84,"fy":"2022","sd":"03/24/2022","cd":"2022-08-20","lat":15.236983,"lon":120.622297,"sm":840,"fm":840,"tm":null,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1015},{"i":1288,"cid":"24CA0037","pid":"P00820210LZ","t":"Construction of Flood Control Structure along Pulo-Kabalutan River, Orani, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORANI (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":96499999.66,"abc":96499999.66,"fy":"2024","sd":"04/22/2024","cd":"2024-11-22","lat":14.81694,"lon":120.5455,"sm":1040,"fm":1040,"tm":1040,"am":1040,"md":0.0,"ls":"inside","ww":"Pulo-Kabalutan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1016},{"i":1289,"cid":"23AA0066","pid":"P00737410LZ","t":"Rehabilitation of Flood Control Structure at Bislak River, Brgy, San Roque II, Bacarra, Ilocos Norte","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4949034.71,"abc":4949912.99,"fy":"2023","sd":"02/06/2023","cd":"2023-04-18","lat":18.247296,"lon":120.622469,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1017},{"i":1290,"cid":"22AB0099","pid":"P00621611LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.93979,"lon":120.69382,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.04,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1018},{"i":1291,"cid":"23CI0035","pid":"P00727135LZ","t":"Construction of Rerinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Capaya, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC","c":38075609.36,"abc":39180107.66,"fy":"2023","sd":"03/06/2023","cd":"2023-06-27","lat":15.149748,"lon":120.623096,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.14953,120.62321],"wst":"matched","br":"Capaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1019},{"i":1292,"cid":"22CI0065","pid":"P00637021LZ","t":"Construction of Reinforced Concrete Slope Protection along Taug River, Angeles City, Pampanga Sta. 0+600 to Sta. 1+350 (L/D)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":70651739.38,"abc":72372122.93,"fy":"2022","sd":"03/24/2022","cd":"2022-10-27","lat":15.150401,"lon":120.546095,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Taug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1020},{"i":1293,"cid":"22PA0084","pid":"P00632778LZ","t":"Construction of Sabangan Flood Control, Buli, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497900.0,"abc":48999964.35,"fy":"2022","sd":"03/28/2022","cd":"2022-10-19","lat":17.6802,"lon":120.694017,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01016,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":714},{"i":1294,"cid":"23CH0020","pid":"P00727129LZ","t":"Construction of Retaining Wall along Guagua River, San Pedro, Sasmuan, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"SASMUAN (SEXMOAN) (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":29393763.68,"abc":29399446.89,"fy":"2023","sd":"03/20/2023","cd":"2023-06-19","lat":14.940176,"lon":120.623471,"sm":1430,"fm":1430,"tm":1430,"am":1430,"md":0.0,"ls":"inside","ww":"Guagua","wn":"Guagua River","wd":0.05,"wp":[14.94027,120.62301],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1021},{"i":1295,"cid":"23C00042","pid":"P00727306LZ","t":"Flood Control Works - Pasig-Potrero River and San Fernando - Sto. Tomas - Minalin Taildike (San Fernando and Bacolor Section) Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"LA UNION","mu":"CITY OF SAN FERNANDO (CAPITAL) (LA UNION)","deo":"Pampanga 1st District Engineering Office","co":"A.D. GONZALES JR. CONSTRUCTION & TRADING CO. INC.","c":257255490.0,"abc":257255442.4,"fy":"2023","sd":"06/12/2023","cd":"2024-06-05","lat":14.990321,"lon":120.694276,"sm":414,"fm":414,"tm":null,"am":978,"md":177.12,"ls":"outside","ww":"Pasig-Potrero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":177.12,"text":"The pin is 177.1 km outside City of San Fernando, La Union, the nearest municipality the record claims. It falls in Minalin, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":73},{"i":1296,"cid":"22CI0095","pid":"P00631255LZ","t":"Construction of reinforced concrete slope protection with steel sheet piles foundation along Abacan river, Sapalibutad, Angeles city, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":23900621.1,"abc":24498672.13,"fy":"2022","sd":"03/24/2022","cd":"2022-09-11","lat":15.149584,"lon":120.623937,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1022},{"i":1297,"cid":"22CA0052","pid":"P00632806LZ","t":"Construction of Flood Control Project along Sapa Creek, Barangay Sapa, Samal, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"SAMAL (BATAAN)","deo":"Bataan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":9799999.76,"abc":9799999.76,"fy":"2022","sd":"05/04/2022","cd":"2022-10-27","lat":14.753828,"lon":120.546194,"sm":1246,"fm":1246,"tm":1246,"am":1246,"md":0.0,"ls":"inside","ww":"Sapa","wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1023},{"i":1298,"cid":"22A00077","pid":"P00620790LZ","t":"Construction of Flood Control Structure along Totonoguen River, Brgy. Zone I, Rosales, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"BET CONSTRUCTION & SUPPLY / AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-03-07","lat":15.89195,"lon":120.624,"sm":1215,"fm":1215,"tm":1215,"am":1215,"md":0.0,"ls":"inside","ww":"Totonoguen","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zone I","len":null,"ph":null,"dup":[1301],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 82,023,706.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1096},{"i":1299,"cid":"22A00177","pid":"P00637753LZ","t":"Construction of Flood Mitigation Structure along Vintar River (Bislak River), Brgy. Alsem, Sitio Di Tulang, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":95039995.11,"abc":95040000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-08-31","lat":18.273768,"lon":120.694613,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Vintar","wn":"Vintar River","wd":6.79,"wp":[18.32888,120.72266],"wst":"matched","br":"Alsem","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":6.79,"text":"The title names Vintar, which OpenStreetMap maps through the stated municipality, but the pin is 6.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":244},{"i":1300,"cid":"22CI0007","pid":"P00631262LZ","t":"Construction of Slope Protection Structure along Taug River, Brgy. Anunas, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"N.M.D. CONSTRUCTION & TRADING","c":23742805.14,"abc":24496581.71,"fy":"2022","sd":"02/08/2022","cd":"2022-07-29","lat":15.150561,"lon":120.546519,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Taug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Anunas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1024},{"i":1301,"cid":"23A00157","pid":"P00726369LZ","t":"Construction of Flood Mitigation Structure along Totonogen River, Zone 4, Rosales, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION","c":33773706.21,"abc":33775000.0,"fy":"2023","sd":"04/24/2023","cd":"2023-10-09","lat":15.89195,"lon":120.624,"sm":1215,"fm":1215,"tm":1215,"am":1215,"md":0.0,"ls":"inside","ww":"Totonogen","wn":"Totonugen Creek","wd":0.03,"wp":[15.89197,120.62371],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1298],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 82,023,706.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1111},{"i":1302,"cid":"23CJ0026","pid":"P00726744LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Rio Chico River Package G, Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":47530899.36,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-24","lat":15.60874,"lon":120.695069,"sm":1626,"fm":432,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.6089,120.6952],"wst":"matched","br":null,"len":null,"ph":"Package G","dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.41,"text":"The record contradicts itself: the title and the pin point to Victoria, Tarlac, but the municipality field names City of Tarlac, Tarlac, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":534},{"i":1303,"cid":"22CK0087","pid":"P00639374LZ","t":"Rehabilitation of Existing Dike along Lucung River, U/S of Santiago Bridge, Left Bank, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":95657621.0,"abc":96499277.23,"fy":"2022","sd":"03/26/2022","cd":"2022-12-29","lat":15.329219,"lon":120.624081,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1548,1003,1745],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22CK0085 to 22CK0088) cover the same site, together worth PHP 280,552,442.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":248},{"i":1304,"cid":"23CJ0151","pid":"P00727289LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Moriones River, Tibagan Section Package F, Tibagan, Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":95524711.75,"abc":96500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-07-21","lat":15.46515,"lon":120.547742,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Moriones","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package F","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1025},{"i":1305,"cid":"24CJ0270","pid":"P00846015LZ","t":"Construction of Bank Protection Structure along Cadaanan Creek (Segment B), Anao, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"ANAO (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":45000000.0,"abc":44550000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-05-14","lat":15.715533,"lon":120.624098,"sm":56,"fm":56,"tm":56,"am":56,"md":0.0,"ls":"inside","ww":"Cadaanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":827},{"i":1306,"cid":"22AD0098","pid":"P00621509LZ","t":"Construction of Balidbid Flood Control, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":14699994.91,"abc":14700000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-09-16","lat":17.145833,"lon":120.547778,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[1308],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 44,099,991.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1120},{"i":1307,"cid":"24AA0103","pid":"P00820700LZ","t":"Construction of Flood Mitigating Structure (River Wall Protection Upstream and Downstream), Barangay San Juan, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":6859904.93,"abc":6859906.41,"fy":"2024","sd":"02/27/2024","cd":"2024-06-29","lat":18.09197,"lon":120.624374,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1026},{"i":1308,"cid":"23AD0043","pid":"P00727076LZ","t":"Construction of Balidbid River Control, Barangay Balidbid, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29399996.02,"abc":29400000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-07-08","lat":17.145833,"lon":120.547778,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":"Balidbid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balidbid","len":null,"ph":null,"dup":[1306],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 44,099,991.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1112},{"i":1309,"cid":"23C00054","pid":"P00726539LZ","t":"Flood Control Works - Construction of Guagua Pasac River","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"NORTHERN BUILDERS","c":193000000.0,"abc":192999753.4,"fy":"2023","sd":"04/18/2023","cd":"2023-11-28","lat":14.911795,"lon":120.624417,"sm":595,"fm":595,"tm":null,"am":1430,"md":3.55,"ls":"outside","ww":"Guagua Pasac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.68,"value":3.55,"text":"The pin is 3.5 km outside Guagua, Pampanga, the nearest municipality the record claims. It falls in Sasmuan, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":194},{"i":1310,"cid":"24CK0069","pid":"P00838435LZ","t":"Rehabilitation of Existing Dike along Lucung River (Café Section, Right Bank), Phase 1, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497825.29,"abc":96499339.15,"fy":"2024","sd":"02/20/2024","cd":"2024-06-18","lat":15.330144,"lon":120.695425,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[1043,1046,1614,1872,1012],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":249},{"i":1311,"cid":"23CJ0025","pid":"P00725735LZ","t":"Construction of Flood Control Structure Along Rio Chico River (Phase V), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605792.49,"abc":96500000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-08-18","lat":15.61345,"lon":120.695439,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.61345,120.69559],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1027},{"i":1312,"cid":"24AD0076","pid":"P00823302LZ","t":"Construction of Balidbid Flood Control Structure, Salcedo, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"SALCEDO (BAUGEN) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48249866.9,"abc":49000000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-11-15","lat":17.145278,"lon":120.547778,"sm":1240,"fm":1240,"tm":1240,"am":1240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1028},{"i":1313,"cid":"22PA0140","pid":"P00621616LZ","t":"Construction of Buli Flood Mitigation Facilities along Major River Basin (Phase III), Sta. 5 + 400 - Sta. 5 + 700, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48997900.0,"abc":48999983.87,"fy":"2022","sd":"06/20/2022","cd":"2022-11-28","lat":17.679383,"lon":120.696001,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":300.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1029},{"i":1314,"cid":"23CH0062","pid":"P00740362LZ","t":"Rehabilitation of Slope Protection along Upper Dalan Bapor, Phase II, at Sasmuan, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"SASMUAN (SEXMOAN) (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96494018.96,"abc":96499684.4,"fy":"2023","sd":"04/24/2023","cd":"2023-12-19","lat":14.93135,"lon":120.62454,"sm":1430,"fm":1430,"tm":1430,"am":1430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1030},{"i":1315,"cid":"22PA0339","pid":"P00637053LZ","t":"Construction of Isit Flood Control, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48997500.0,"abc":48999959.67,"fy":"2022","sd":"11/08/2022","cd":"2023-05-22","lat":17.648705,"lon":120.696098,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1031},{"i":1316,"cid":"24CJ0259","pid":"P00823412LZ","t":"Construction of Flood Control Structure along Tarlac River Right Dike (Segment B), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-10-18","lat":15.627703,"lon":120.548181,"sm":432,"fm":432,"tm":432,"am":1092,"md":7.09,"ls":"outside","ww":"Tarlac","wn":"Tarlac River","wd":0.87,"wp":[15.62778,120.54006],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.78,"value":7.09,"text":"The pin is 7.1 km outside City of Tarlac, Tarlac, the nearest municipality the record claims. It falls in Paniqui, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":147},{"i":1317,"cid":"22PA0048","pid":"P00631102LZ","t":"Construction of Sto. Tomas Flood Control, Manabo, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"MANABO (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49000000.0,"abc":48999996.07,"fy":"2022","sd":"02/17/2022","cd":"2022-08-23","lat":17.444304,"lon":120.696128,"sm":910,"fm":910,"tm":910,"am":910,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1032},{"i":1318,"cid":"24AI0062","pid":"P00824659LZ","t":"Construction of Flood Control Structure along Mitura River, Brgy. Sobol, Asingan, Pangasinan, Phase I","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"SAN NICOLAS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":24468214.86,"abc":24500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-22","lat":16.0137,"lon":120.6252,"sm":77,"fm":1341,"tm":77,"am":77,"md":0.0,"ls":"inside","ww":"Mitura","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sobol","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":10.69,"text":"The record contradicts itself: the title and the pin point to Asingan, Pangasinan, but the municipality field names San Nicolas, Pangasinan, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":581},{"i":1319,"cid":"23CJ0028","pid":"P00736620LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Ayson to Dicolor Section (Package A), Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":47530047.71,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-06-23","lat":15.617936,"lon":120.554125,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.28,"wp":[15.61524,120.54252],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1033},{"i":1320,"cid":"23CH0036","pid":"P00727131LZ","t":"Construction of Slope Protection along GPDC, San Pablo-Santa Rita, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":29393966.78,"abc":29399894.48,"fy":"2023","sd":"03/20/2023","cd":"2023-10-30","lat":14.924239,"lon":120.548236,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1034},{"i":1321,"cid":"23PA0019","pid":"P00726393LZ","t":"Construction of Flood Control Structure along Abra Major River Basin (Phase II), Bagalay, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96499891.0,"abc":96499890.55,"fy":"2023","sd":"03/30/2023","cd":"2023-06-28","lat":17.628189,"lon":120.696544,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[1025,1505,1933],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23PA0019 to 23PA0022) cover the same site, together worth PHP 385,999,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":199},{"i":1322,"cid":"24CH0040","pid":"P00820835LZ","t":"Construction of Slope Protection Structure along Patengle Creek, San Francisco Section, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":24492340.56,"abc":24499293.41,"fy":"2024","sd":"02/19/2024","cd":"2024-05-28","lat":14.9661,"lon":120.55451,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Patengle","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1035},{"i":1323,"cid":"24CJ0002","pid":"P00820862LZ","t":"Construction of Slope Protection Structure along Inerangan River (Segment B), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-24","lat":15.687825,"lon":120.625411,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Inerangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":636},{"i":1324,"cid":"22AB0095","pid":"P00621607LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River (Left Bank), Barangay Cabittauran, Sitio Namalican 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-12-07","lat":17.93761,"lon":120.69657,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[1649,1620,1637,1327],"cl":[1327,1602,1620,1637,1642,1649,1656],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22AB0092 to 22AB0097) cover the same site, together worth PHP 244,999,987.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":121},{"i":1325,"cid":"24CB0063","pid":"P00820200LZ","t":"Construction of Flood Control Structure along Gasile River, Pilar, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"PILAR (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"RAM BUILDERS & TRADING","c":28950000.0,"abc":29400000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-28","lat":14.644353,"lon":120.549656,"sm":1130,"fm":1130,"tm":1130,"am":1130,"md":0.0,"ls":"inside","ww":"Gasile","wn":"Gasile River","wd":0.01,"wp":[14.6444,120.54959],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1036},{"i":1326,"cid":"24CJ0049","pid":"P00821238LZ","t":"Construction of Flood Control Structure along O'Donnell River, Moriones-Balanti Section (Section B), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-18","lat":15.687806,"lon":120.625425,"sm":432,"fm":432,"tm":432,"am":1200,"md":15.16,"ls":"outside","ww":"O'Donnell","wn":"O' Donnel River","wd":24.71,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Section B","dup":[],"run":[],"cl":[],"L":"records","s":87,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.89,"value":15.16,"text":"The pin is 15.2 km outside City of Tarlac, Tarlac, the nearest municipality the record claims. It falls in Ramos, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.81,"value":24.71,"text":"The title names O'Donnell, which OpenStreetMap maps through the stated municipality, but the pin is 24.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":6},{"i":1327,"cid":"22AB0097","pid":"P00621609LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River (Right Bank), Barangay Cabittauran, Sitio Namalican 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.93795,"lon":120.6969,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[1649,1620,1324,1637],"cl":[1324,1602,1620,1637,1642,1649,1656],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22AB0092 to 22AB0097) cover the same site, together worth PHP 244,999,987.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":122},{"i":1328,"cid":"21CH0039","pid":"P00525588LZ","t":"Construction of Slope Protection, Angeles-Porac Bypass Road, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"Porac","deo":"Pampanga 2nd District Engineering Office","co":"TONKA CONSTRUCTION / FERDSTAR BUILDERS INC.","c":91558129.3,"abc":91578039.15,"fy":"2021","sd":"04/11/2022","cd":"2022-12-11","lat":15.109719,"lon":120.554973,"sm":1164,"fm":null,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1037},{"i":1329,"cid":"23CH0087","pid":"P00740617LZ","t":"Construction of Slope Protection along Palcarangan Creek, Sta. Cruz, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC","c":19571542.39,"abc":19599864.28,"fy":"2023","sd":"06/19/2023","cd":"2023-11-15","lat":14.91048,"lon":120.54968,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Palcarangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1038},{"i":1330,"cid":"22PA0329","pid":"P00637055LZ","t":"Construction of Angad Flood Control, Bangued, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BANGUED (CAPITAL) (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48998000.0,"abc":48999983.5,"fy":"2022","sd":"10/24/2022","cd":"2025-02-03","lat":17.572184,"lon":120.626453,"sm":150,"fm":150,"tm":150,"am":150,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1039},{"i":1331,"cid":"23CJ0148","pid":"P00727287LZ","t":"Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Moriones-Tarlac Flood Control (Package S), Balanti Section, Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION / T2B3 BUILDERS AND SUPPLIES CORP.","c":94492060.39,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-20","lat":15.465936,"lon":120.555775,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package S","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1040},{"i":1332,"cid":"22CH0003","pid":"P00620183LZ","t":"Construction of Slope Protection along Angeles-Porac Bypass Road (Phase III), Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"TONKA CONSTRUCTION / FERDSTAR BUILDERS INC.","c":96098491.37,"abc":96113891.43,"fy":"2022","sd":"03/07/2022","cd":"2022-11-16","lat":15.1158,"lon":120.5501,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1041},{"i":1333,"cid":"23CJ0156","pid":"P00727367LZ","t":"Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Rio Chico River (Package B), Victoria, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / M.M. SERRANO CONSTRUCTION COMPANY","c":47999505.2,"abc":49000000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-02","lat":15.607353,"lon":120.697178,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.60753,120.69731],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1042},{"i":1334,"cid":"23CH0030","pid":"P00727132LZ","t":"Construction of Slope Protection along Balantacan River, Balantacan to Sta. Teresa 2nd , Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"DMDANAN CONSTRUCTION AND TRADING","c":39193042.59,"abc":39198176.53,"fy":"2023","sd":"03/20/2023","cd":"2023-08-16","lat":14.893185,"lon":120.555785,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Balantacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1043},{"i":1335,"cid":"24AA0370","pid":"P00845884LZ","t":"Construction of Drainage Canal along Sitio Binasay, Brgy. 40 Balatong, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":4949900.42,"abc":4949913.57,"fy":"2024","sd":"06/07/2024","cd":"2024-09-08","lat":18.159463,"lon":120.551139,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"40 Balatong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1044},{"i":1336,"cid":"24CE0218","pid":"P00823476LZ","t":"Construction of Flood Control Structure along Rio Chico, Barangay Macamias, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":19105042.95,"abc":19300000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-09-20","lat":15.619846,"lon":120.697862,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macamias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1045},{"i":1337,"cid":"24CJ0250","pid":"P00823411LZ","t":"Construction of Flood Control Structure along Tarlac River Right Dike (Segment A), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-10-20","lat":15.623689,"lon":120.551683,"sm":580,"fm":580,"tm":432,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.15,"wp":[15.6199,120.54172],"wst":"matched","br":null,"len":null,"ph":"Segment A","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.59,"text":"The record contradicts itself: the municipality field and the pin point to Gerona, Tarlac, but the title names City of Tarlac, Tarlac, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":424},{"i":1338,"cid":"24CH0030","pid":"P00820832LZ","t":"Construction of Slope Protection Structure along Balantacan River, Balantacan to Sta. Teresa 2nd, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"V. TRILLANA BUILDERS & TRADING / RADIANS BUILDERS AND SUPPLY CORPORATION","c":41852777.94,"abc":41858551.09,"fy":"2024","sd":"02/19/2024","cd":"2024-08-16","lat":14.89301,"lon":120.55583,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Balantacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1046},{"i":1339,"cid":"24CJ0242","pid":"P00824712LZ","t":"Construction of Flood Structure along Ungot Creek (Segment U), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":25000000.0,"abc":24500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-06-18","lat":15.455375,"lon":120.626761,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment U","dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":800},{"i":1340,"cid":"23CH0055","pid":"P00740607LZ","t":"Construction of Slope Protection with Road Dike along GPDC, Santa Rita - San Pedro, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":48986593.16,"abc":48999848.66,"fy":"2023","sd":"05/15/2023","cd":"2023-11-10","lat":14.921841,"lon":120.551748,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1047},{"i":1341,"cid":"22AI0071","pid":"P00620469LZ","t":"Construction of Flood Mitigation Structure along Macalong River, Sta. 0+000 - Sta. 0+243.20, Brgy. Nancamaliran East, Urdaneta City, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":39131477.44,"abc":39200000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-07-05","lat":15.9747,"lon":120.5528,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Macalong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nancamaliran East","len":243.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1048},{"i":1342,"cid":"23AA0283","pid":"P00740538LZ","t":"Construction of Slope Protection, Purok I & Purok II, Barangay Pulangi, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4899866.03,"abc":4899951.32,"fy":"2023","sd":"04/11/2023","cd":"2023-06-20","lat":18.27042,"lon":120.6268,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulangi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1049},{"i":1343,"cid":"21CH0089","pid":"P00526040LZ","t":"Construction of Slope Protection (with concreting of top of dike), GPDC San Pablo-Sta. Rita, Lubao","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"Lubao","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":29390737.33,"abc":29399284.76,"fy":"2021","sd":"03/09/2022","cd":"2022-09-04","lat":14.919546,"lon":120.556813,"sm":816,"fm":null,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1050},{"i":1344,"cid":"24CJ0010","pid":"P00821243LZ","t":"Construction of Flood Control Structure along Rio Chico River (Segment K), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-13","lat":15.591047,"lon":120.698247,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.59105,120.69839],"wst":"matched","br":null,"len":null,"ph":"Segment K","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":404},{"i":1345,"cid":"22CH0001","pid":"P00620184LZ","t":"Construction of Slope Protection along Angeles-Porac Bypass Road, Porac, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. POLICARPIO & COMPANY INC.","c":96204248.42,"abc":96210422.74,"fy":"2022","sd":"03/07/2022","cd":"2022-11-16","lat":15.1065,"lon":120.5578,"sm":1164,"fm":1164,"tm":1164,"am":1164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1051},{"i":1346,"cid":"23CJ0158","pid":"P00742371LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Dicolor Section, Gerona, Tarlac (Package A)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-05-24","lat":15.620403,"lon":120.553544,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.26,"wp":[15.61893,120.54192],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1052},{"i":1347,"cid":"24PD0024","pid":"P00821132LZ","t":"Construction of Flood Mitigation Structure along Asin Gallano River, Sta. 0+000 - Sta. 0+400, Sta. 2 + 810 - Sta. 3 + 000, Baguio City","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-29","lat":16.431,"lon":120.5586,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Asin Gallano","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":590.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1053},{"i":1348,"cid":"22AA0133","pid":"P00621586LZ","t":"Construction of Flood Mitigation Facilities along Laoag River, Sta. Magdalena Creek (Sinigpit), Barangay 15, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":34299595.93,"abc":34299599.62,"fy":"2022","sd":"08/22/2022","cd":"2022-12-19","lat":18.10218,"lon":120.627307,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"15","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1054},{"i":1349,"cid":"23CJ0044","pid":"P00737485LZ","t":"Construction of Slope Protection with Sheet Pile Foundation along Tarlac River Control Right Dike, Ayson to Dicolor Section (Package A), Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING / FRAMECON BUILDERS","c":48483371.91,"abc":49500000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-07-18","lat":15.620392,"lon":120.55357,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.26,"wp":[15.61893,120.54192],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1055},{"i":1350,"cid":"24CB0020","pid":"P00820808LZ","t":"Construction of Flood Control Structure along San Vicente River (Downstream), Orion, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORION (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-17","lat":14.62446,"lon":120.5588,"sm":1042,"fm":1042,"tm":1042,"am":1042,"md":0.0,"ls":"inside","ww":"San Vicente","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1056},{"i":1351,"cid":"23A00303","pid":"P00727061LZ","t":"Construction of Flood Control Structure along Garasgas River, (Downstream of Garasgas Bridge), Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":30107779.91,"abc":30108000.0,"fy":"2023","sd":"06/30/2023","cd":"2024-02-09","lat":18.075969,"lon":120.558838,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Garasgas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1057},{"i":1352,"cid":"22PA0049","pid":"P00632760LZ","t":"Construction of Cardona - Isit Flood Control, Barangay Cardona, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497200.0,"abc":48999811.47,"fy":"2022","sd":"02/17/2022","cd":"2022-10-20","lat":17.650495,"lon":120.698502,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cardona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":715},{"i":1353,"cid":"22PA0090","pid":"P00632781LZ","t":"Construction of Soot Flood Control Structure (Phase 2), Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497500.0,"abc":48999974.62,"fy":"2022","sd":"03/30/2022","cd":"2022-10-11","lat":17.630947,"lon":120.627418,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":716},{"i":1354,"cid":"22CJ0014","pid":"P00620552LZ","t":"Rehabilitation of Flood Control Structure along Tarlac River Control (Right Dike), Tagumbao-Dicolor Section (Package B), Sta. 0+000 - Sta. 0+313, Gerona, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":47531186.78,"abc":48131720.0,"fy":"2022","sd":"03/29/2022","cd":"2022-07-18","lat":15.610505,"lon":120.554103,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.0,"wp":[15.60765,120.5453],"wst":"matched","br":null,"len":313.0,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1058},{"i":1355,"cid":"22A00168","pid":"P00620930LZ","t":"Construction of Flood Control Structure along Garasgas Creek (Phase II), Brgy. Quiling Norte, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249995.97,"abc":48250000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-03-18","lat":18.07573,"lon":120.559,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Garasgas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quiling Norte","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1059},{"i":1356,"cid":"24CJ0013","pid":"P00821244LZ","t":"Construction of Flood Control Structure along Rio Chico River (Segment L), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-09-19","lat":15.594817,"lon":120.698544,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.59478,120.69863],"wst":"matched","br":null,"len":null,"ph":"Segment L","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":405},{"i":1357,"cid":"24CJ0218","pid":"P00846019LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Ungot Creek Including Road Component Segment D, Tarlac City","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":50000000.0,"abc":49500000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-10","lat":15.457891,"lon":120.62792,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment D","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":717},{"i":1358,"cid":"22CJ0028","pid":"P00620551LZ","t":"Construction of Flood Mitigation Structure along Tarlac River Control, Left Dike, Tibagan-Tibag Section (Package F), Tarlac City","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":37120120.86,"abc":37571240.0,"fy":"2022","sd":"01/28/2022","cd":"2022-07-15","lat":15.469469,"lon":120.559193,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.69,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Package F","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1060},{"i":1359,"cid":"22CK0057","pid":"P00620196LZ","t":"Rehabilitation of Existing Dike along Lucung River, Sta. 4+859 to Sta. 4+314, D/S of Santiago Bridge (Jefmin Section, Left Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":57899409.79,"abc":57899359.76,"fy":"2022","sd":"02/16/2022","cd":"2022-10-01","lat":15.330083,"lon":120.628103,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":545.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1061},{"i":1360,"cid":"24CJ0273","pid":"P00848629LZ","t":" Bank Improvement along Tarlac River-O' Donell River, Moriones - Balanti Section, Tarlac (Segment H)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"JUSTBILT BUILDERS","c":99000000.0,"abc":99000000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-01-17","lat":15.44485,"lon":120.559428,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":3.11,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment H","dup":[],"run":[1372,1104,1101],"cl":[],"L":"records","s":64,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.11,"text":"The title names Tarlac, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CJ0273 to 24CJ0278) cover the same site, together worth PHP 441,750,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":68},{"i":1361,"cid":"22CJ0184","pid":"P00621283LZ","t":"Construction of Slope Protection Structure along Tarlac River Control Left Dike, Tibagan-Tibag-Section Package B, Tarlac Citv, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-28","lat":15.470507,"lon":120.559601,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.6,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[1278,1373],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0183 to 22CJ0185) cover the same site, together worth PHP 280,815,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":318},{"i":1362,"cid":"22PA0336","pid":"P00637060LZ","t":"Construction of Coribot Flood Control Phase 2, Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48997500.0,"abc":48999930.33,"fy":"2022","sd":"12/28/2022","cd":"2023-07-11","lat":17.634323,"lon":120.628103,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1062},{"i":1363,"cid":"22CI0066","pid":"P00637022LZ","t":"Construction of Reinforced Concrete Slope Protection along Abacan River Upstream of Friendship Bridge, Sta. 0+050 to Sta. 0+650 (R/D), Brgy. Anunas, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NICLEDON CONSTRUCTION / GRACE CONSTRUCTION CORPORATION","c":57867366.65,"abc":57894554.79,"fy":"2022","sd":"03/24/2022","cd":"2022-11-10","lat":15.156976,"lon":120.559749,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.0,"wp":[15.15698,120.55975],"wst":"matched","br":"Anunas","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1063},{"i":1364,"cid":"21P00084","pid":"P00561460LZ","t":"Construction of Amburayan Flood Control, Kapangan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Kapangan","deo":"Benguet 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE / KALAHAN GENERAL CONSTRUCTION AND SUPPLIES","c":96372298.9,"abc":96495738.04,"fy":"2021","sd":"01/07/2022","cd":"2022-12-08","lat":16.61412,"lon":120.62813,"sm":698,"fm":null,"tm":698,"am":698,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1064},{"i":1365,"cid":"23CI0102","pid":"P00727134LZ","t":"Repair/Improvement of Reinforced Concrete Slope Protection along Sapang Balen Creek, Brgy. Cutcut and Brgy. Pampang, Angeles City, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AL-B DEVELOPMENT CORPORATION","c":24436607.86,"abc":24497740.71,"fy":"2023","sd":"05/08/2023","cd":"2023-09-04","lat":15.15706,"lon":120.559898,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":18.79,"wp":[15.31113,120.63319],"wst":"matched","br":"Cutcut","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1065},{"i":1366,"cid":"24CJ0211","pid":"P00845802LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Ungot Creek including Road Component Segment C, Tarlac City","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":50000000.0,"abc":49500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-05-10","lat":15.458628,"lon":120.628162,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment C","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":718},{"i":1367,"cid":"24CJ0020","pid":"P00821278LZ","t":"Construction of Secondary Dike of Rio Chico River (Section A), Victoria, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP. / RPV RED MOUNTAIN KONSTRUCT, INC.","c":92954070.0,"abc":90606745.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-05","lat":15.589481,"lon":120.698553,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.58948,120.69841],"wst":"matched","br":null,"len":null,"ph":"Section A","dup":[],"run":[],"cl":[],"L":"field","s":35,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":500},{"i":1368,"cid":"24CJ0267","pid":"P00848628LZ","t":"Construction/Improvement of Bank along Tarlac River - O' Donell River, Moriones - Balanti Section (Segment G)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"JUSTBILT BUILDERS","c":99000000.0,"abc":99000000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-01-17","lat":15.446597,"lon":120.559922,"sm":432,"fm":432,"tm":null,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":2.91,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment G","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1066},{"i":1369,"cid":"24CJ0263","pid":"P00848627LZ","t":"Construction/Improvement of Bank along Tarlac River - O' Donell River, Moriones - Balanti Section (Segment F)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"JUSTBILT BUILDERS","c":99000000.0,"abc":99000000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-01-17","lat":15.449003,"lon":120.560761,"sm":432,"fm":432,"tm":null,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":2.63,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment F","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1067},{"i":1370,"cid":"22A00167","pid":"P00620929LZ","t":"Construction of Flood Control Structure along Garasgas Creek (Phase I), Brgy. Quiling Norte, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249996.03,"abc":48250000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-03-18","lat":18.075937,"lon":120.561256,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Garasgas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quiling Norte","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1068},{"i":1371,"cid":"23A00095","pid":"P00725589LZ","t":"Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY / ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":192999797.1,"abc":193000000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-08-17","lat":18.13775,"lon":120.56141,"sm":1340,"fm":1340,"tm":1340,"am":1340,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Asuncion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1069},{"i":1372,"cid":"24CJ0274","pid":"P00823410LZ","t":"Construction of Flood Control Structure along Tarlac River Left Dike (Segment B), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-12-20","lat":15.572044,"lon":120.561583,"sm":580,"fm":580,"tm":432,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.96,"wp":[15.57769,120.56842],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[1360,1104,1101],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24CJ0273 to 24CJ0278) cover the same site, together worth PHP 441,750,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":173},{"i":1373,"cid":"22CJ0185","pid":"P00621284LZ","t":"Construction of Slope Protection Structure along Tarlac River Control Left Dike, Tibagan-Tibag-Section Package C, Tarlac Citv, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-22","lat":15.472255,"lon":120.562067,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.3,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[1278,1361],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CJ0183 to 22CJ0185) cover the same site, together worth PHP 280,815,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":319},{"i":1374,"cid":"24CJ0032","pid":"P00820859LZ","t":"Construction of Flood Control Structure along Tarlac River - O'Donnell River Control, Balanti-Armenia Section (Segment N), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":44099535.44,"abc":44100000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-19","lat":15.463667,"lon":120.562417,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.0,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment N","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1070},{"i":1375,"cid":"22CH0011","pid":"P00620185LZ","t":"Construction of Slope Protection along Patangle Creek, San Francisco-San Vicente Section, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"OMICRON CONSTRUCTION","c":74111721.84,"abc":77199710.56,"fy":"2022","sd":"03/07/2022","cd":"2022-07-06","lat":14.958938,"lon":120.562715,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Patangle","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1071},{"i":1376,"cid":"23CJ0042","pid":"P00726745LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along O'Donnell River Control Right Dike, Armenia-San Jose De Urquico Section (Package B), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-29","lat":15.445847,"lon":120.562989,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.11,"wp":[15.44577,120.56201],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1072},{"i":1377,"cid":"23PE0016","pid":"P00726406LZ","t":"Construction of Flood Mitigation Structure along Bauang River, Section 1a (Wangal), Sta. 056 + 276 - Sta. 057 + 526, Wangal, La Trinidad, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / JMJD CONSTRUCTION AND AGGREGATES","c":77190000.0,"abc":77200000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-11-12","lat":16.464296,"lon":120.56299,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":"Bauang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1073},{"i":1378,"cid":"22A00166","pid":"P00620931LZ","t":"Construction of Flood Mitigation Structure along Garasgas Creek, Downstream of Garasgas Bridge, Brgy. Bil-loca, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249997.24,"abc":48250000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-03-18","lat":18.07659,"lon":120.563003,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Garasgas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bil-loca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1074},{"i":1379,"cid":"24CJ0088","pid":"P00820209LZ","t":"Construction of Flood Control Structure along O'Donnell River Control, Moriones - Balanti Section (Section D), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":92954070.0,"abc":90606745.0,"fy":"2024","sd":"02/07/2024","cd":"2024-09-19","lat":15.462436,"lon":120.563029,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"O'Donnell","wn":"O' Donnel River","wd":0.2,"wp":[15.46326,120.56469],"wst":"matched","br":null,"len":null,"ph":"Section D","dup":[],"run":[],"cl":[],"L":"field","s":35,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":501},{"i":1380,"cid":"24CJ0128","pid":"P00821247LZ","t":"Construction of Flood Control Structure along Tarlac River - O'Donnell River, Balanti - Armenia Section (Segment A), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"1FC DIZON CORP. / A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-19","lat":15.460256,"lon":120.563094,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.36,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment A","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":406},{"i":1381,"cid":"23CJ0062","pid":"P00727274LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation Along O'Donnell River Control Right Dike, Armenia to San Jose De Urquico Section (Package D), Barangays Armenia to San Jose De Urquico, Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":65522147.96,"abc":67550000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-14","lat":15.443461,"lon":120.563133,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Sheet Pile Foundation Along O'Donnell","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Armenia","len":null,"ph":"Package D","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1075},{"i":1382,"cid":"23AA0304","pid":"P00740559LZ","t":"Construction of Flood Control on Main Drainage Canal and Tributaries at South of River (Cataban and Caaoacan Section), Laoag City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48999812.73,"abc":48999888.76,"fy":"2023","sd":"04/12/2023","cd":"2023-11-20","lat":18.23415,"lon":120.563314,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1076},{"i":1383,"cid":"24CJ0135","pid":"P00821248LZ","t":"Construction of Flood Control Structure along Tarlac River - O' Donnell River, Balanti - Armenia Section (Segment B), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-19","lat":15.457889,"lon":120.563469,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.62,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":407},{"i":1384,"cid":"24CJ0145","pid":"P00821249LZ","t":"Construction of Flood Control Structure along Tarlac River - O' Donnell River, Balanti - Armenia Section (Segment C), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-19","lat":15.455475,"lon":120.563733,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.88,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Segment C","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":408},{"i":1385,"cid":"22A00173","pid":"P00620784LZ","t":"Construction of Flood Control Structure along Quiaoit River (Phase I), Brgy. Mabaleng, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":77199998.73,"abc":77200000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-01-26","lat":18.0056,"lon":120.564,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.03,"wp":[18.00584,120.56415],"wst":"matched","br":"Mabaleng","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1077},{"i":1386,"cid":"22A00174","pid":"P00620785LZ","t":"Construction of Flood Control Structure along Quiaoit River (Phase II), Brgy. Mabaleng, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":77199998.15,"abc":77200000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-01-26","lat":18.0055,"lon":120.564,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Quiaoit","wn":"Quiaoit River","wd":0.04,"wp":[18.00581,120.5642],"wst":"matched","br":"Mabaleng","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1078},{"i":1387,"cid":"23CJ0080","pid":"P00740374LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along O'Donnell-Tarlac River (Right Dike), Armenia-Aguso Section, Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":94811038.77,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-08-15","lat":15.450375,"lon":120.564492,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"O'Donnell-Tarlac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1079},{"i":1388,"cid":"22A00169","pid":"P00620932LZ","t":"Construction of Flood Mitigation Structure along Garasgas Creek, Upstream of Garasgas Bridge, Brgy. Bil-loca, Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249999.86,"abc":48250000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-03-18","lat":18.073875,"lon":120.564756,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Garasgas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bil-loca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1080},{"i":1389,"cid":"24PD0027","pid":"P00821133LZ","t":"Construction of Flood Mitigation Structure along Asin-Gallano River (Sta. 3+750 - Sta. 4+024), Baguio City","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":96500000.0,"abc":145500000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-29","lat":16.4298,"lon":120.5653,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Asin-Gallano","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":274.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1081},{"i":1390,"cid":"24CI0006","pid":"P00820849LZ","t":"Construction Slope Protection Structure along Abacan River, Barangay Anunas to Barangay Malabañas (Phase II), Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"NICLEDON CONSTRUCTION","c":48979865.38,"abc":48981179.2,"fy":"2024","sd":"02/16/2024","cd":"2024-04-19","lat":15.15638,"lon":120.5655,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.01,"wp":[15.15631,120.56545],"wst":"matched","br":"Anunas","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1082},{"i":1391,"cid":"24CI0005","pid":"P00820848LZ","t":"Construction Slope Protection Structure along Abacan River, Barangay Anunas to Barangay Malabañas (Phase I), Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION","c":48988462.52,"abc":48994615.49,"fy":"2024","sd":"03/04/2024","cd":"2024-07-19","lat":15.15561,"lon":120.5663,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.02,"wp":[15.15554,120.56616],"wst":"matched","br":"Anunas","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1083},{"i":1392,"cid":"23AB0108","pid":"P00742262LZ","t":"Construction and Upgrading of Drainage Canal, Barangay Ricarte 1-N , Batac City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":5940000.0,"abc":5940000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-09-01","lat":18.05695,"lon":120.56638,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ricarte 1-N","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1084},{"i":1393,"cid":"23CJ0145","pid":"P00740361LZ","t":"Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Tarlac Flood Control (Left Dike), Sta. Maria-San Bartolome Section (Package E), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":95530140.96,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-09-18","lat":15.568683,"lon":120.566575,"sm":432,"fm":432,"tm":432,"am":580,"md":0.54,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package E","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1085},{"i":1394,"cid":"22CJ0223","pid":"P00640530LZ","t":"Rehabilitation of Tarlac River Flood Control Project at Barangays Balanti-San Luis-Carangian-Tibag, Tarlac City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":24255000.0,"abc":24750000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-24","lat":15.47246,"lon":120.566813,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.18,"wp":[15.47305,120.56526],"wst":"matched","br":"Balanti-San Luis-Carangian-Tibag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1086},{"i":1395,"cid":"24CJ0078","pid":"P00821595LZ","t":"Rehabilitation of Flood Control Structure along Tarlac River (Right Dike), Carangian Section (Package L), Tarlac City, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-10-09","lat":15.474359,"lon":120.567136,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.17,"wp":[15.47433,120.56551],"wst":"matched","br":null,"len":null,"ph":"Package L","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1087},{"i":1396,"cid":"24EB0072","pid":"P00824743LZ","t":"Construction of Flood Control Structure at Mananao River, Paluan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":9760904.14,"abc":9800000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-07-10","lat":13.504385,"lon":120.567399,"sm":1072,"fm":1072,"tm":1072,"am":1072,"md":0.0,"ls":"inside","ww":"Mananao","wn":"Mananao River","wd":1.04,"wp":[13.50314,120.55793],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1088},{"i":1397,"cid":"23AI0086","pid":"P00742285LZ","t":"Construction of Drainage canal at Brgy. Nancayasan , Urdaneta City Pangsasinan.","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.F. FLORES CONSTRUCTION (FORMERLY PATRIOT CONSTRU","c":4894253.08,"abc":4900000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-06-13","lat":15.969476,"lon":120.567457,"sm":434,"fm":434,"tm":null,"am":434,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nancayasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1089},{"i":1398,"cid":"23CJ0140","pid":"P00727291LZ","t":"Rehabilitation of Slope Protection Structure with Steel Sheet Pile Foundation Along Tarlac Flood Control (Right Dike), Carangian Section (Package R), Tarlac City, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"SPYS BUILDERS CORP. (FORMERLY: SPYS BUILDERS) / T2B3 BUILDERS AND SUPPLIES CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-07-18","lat":15.480294,"lon":120.567472,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package R","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1090},{"i":1399,"cid":"23CJ0144","pid":"P00742132LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package D)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":57189172.97,"abc":58410000.0,"fy":"2023","sd":"06/06/2023","cd":"2023-08-18","lat":15.567642,"lon":120.568139,"sm":432,"fm":448,"tm":432,"am":580,"md":0.51,"ls":"boundary","ww":"Tarlac","wn":"Tarlac River","wd":1.0,"wp":[15.57604,120.57155],"wst":"matched","br":null,"len":null,"ph":"Package D","dup":[],"run":[1404,1438],"cl":[],"L":"records","s":51,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.8,"text":"The record contradicts itself: the title and the pin point to City of Tarlac, Tarlac, but the municipality field names Concepcion, Tarlac, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CJ0142 to 23CJ0146) cover the same site, together worth PHP 164,795,244.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":179},{"i":1400,"cid":"22CK0109","pid":"P00640532LZ","t":"Rehabilitation of Existing Bank along Parua River (Banaba Section), Bamban, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"BAMBAN (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":29699966.66,"abc":29399533.78,"fy":"2022","sd":"03/24/2022","cd":"2022-08-01","lat":15.263347,"lon":120.568514,"sm":141,"fm":141,"tm":141,"am":840,"md":0.01,"ls":"boundary","ww":"Parua","wn":"Parua River","wd":2.76,"wp":[15.2743,120.5916],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01022,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":869},{"i":1401,"cid":"24AI0006","pid":"P00820719LZ","t":"Construction of Flood Control Structure along Aloragat River, Barangay Bugayong-Vacante, Binalonan, Pangasinan (Package 5)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48921063.43,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-03-26","lat":16.080135,"lon":120.568797,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.0,"wp":[16.08014,120.5688],"wst":"matched","br":"Bugayong-Vacante","len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1091},{"i":1402,"cid":"22A00164","pid":"P00620933LZ","t":"Construction of Revetment along Tributary of Diappa Creek, Downstream of Diappa Bridge (Phase I), Batac City, Ilocos Norte","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-07-15","lat":18.056119,"lon":120.569355,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Diappa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1092},{"i":1403,"cid":"22A00165","pid":"P00620934LZ","t":"Construction of Revetment along Tributary of Diappa Creek, Downstream of Diappa Bridge (Phase II), Batac City, Ilocos Norte","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-07-15","lat":18.056043,"lon":120.569617,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":"Diappa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1093},{"i":1404,"cid":"23CJ0142","pid":"P00742131LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package C)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS","c":59170297.08,"abc":60390000.0,"fy":"2023","sd":"06/06/2023","cd":"2023-08-18","lat":15.566344,"lon":120.569678,"sm":432,"fm":448,"tm":432,"am":580,"md":0.46,"ls":"boundary","ww":"Tarlac","wn":"Tarlac River","wd":1.07,"wp":[15.57535,120.57334],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[1399,1438],"cl":[],"L":"records","s":52,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.62,"text":"The record contradicts itself: the title and the pin point to City of Tarlac, Tarlac, but the municipality field names Concepcion, Tarlac, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CJ0142 to 23CJ0146) cover the same site, together worth PHP 164,795,244.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":169},{"i":1405,"cid":"23AA0108","pid":"P00725608LZ","t":"Construction of Flood Mitigating Structures along Bacarra - Vintar River (Bislak River), Barangay 34, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS / MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899998.72,"abc":58799830.53,"fy":"2023","sd":"03/13/2023","cd":"2023-08-15","lat":18.216031,"lon":120.569711,"sm":89,"fm":89,"tm":89,"am":751,"md":3.13,"ls":"outside","ww":"Vintar","wn":"Vintar River","wd":20.44,"wp":[18.32888,120.72266],"wst":"matched","br":"34","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.67,"value":3.13,"text":"The pin is 3.1 km outside Bacarra, Ilocos Norte, the nearest municipality the record claims. It falls in Laoag City, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":267},{"i":1406,"cid":"23CK0038","pid":"P00726189LZ","t":"Rehabilitation of Existing Dike along Aranguren Creek, Left Bank, U/S of Calumpit Bridge, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48979796.38,"abc":48999609.39,"fy":"2023","sd":"01/31/2023","cd":"2023-06-13","lat":15.3515,"lon":120.5701,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Aranguren","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1094},{"i":1407,"cid":"23CI0028","pid":"P00726736LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Sacobia River, Macapagal Village, Mabalacat, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":48991583.0,"abc":48992194.73,"fy":"2023","sd":"02/03/2023","cd":"2023-05-23","lat":15.2277,"lon":120.5705,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sacobia","wn":"Sacobia River","wd":1.52,"wp":[15.23627,120.55942],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1095},{"i":1408,"cid":"25CJ0129","pid":"P00921065LZ","t":"Rehabilitation of Sabo Dam at Camangaan West CIS, Moncada, Tarlac","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"MONCADA (TARLAC)","deo":"Tarlac District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS","c":14700000.0,"abc":14700000.0,"fy":"2025","sd":"01/27/2025","cd":"2025-04-16","lat":15.716535,"lon":120.570923,"sm":985,"fm":985,"tm":985,"am":985,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1096},{"i":1409,"cid":"24CI0021","pid":"P00823456LZ","t":"Construction of Flood Control Structure in Angeles City, Pampanga (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION","c":48247379.4,"abc":48983729.91,"fy":"2024","sd":"02/12/2024","cd":"2024-04-30","lat":15.145846,"lon":120.570956,"sm":61,"fm":61,"tm":null,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1097},{"i":1410,"cid":"23CJ0027","pid":"P00726541LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package E), Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":70203784.94,"abc":72375000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-06-19","lat":15.563294,"lon":120.572119,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.3,"wp":[15.57429,120.57629],"wst":"matched","br":null,"len":null,"ph":"Package E","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1098},{"i":1411,"cid":"24AA0132","pid":"P00825209LZ","t":"Construction of Flood Mitigation Structure along Laoag River Basin, Buttong Creek, Barangay Buttong, Laoag City, Ilocos Norte (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":9649102.48,"abc":9649127.11,"fy":"2024","sd":"03/04/2024","cd":"2024-04-18","lat":18.182739,"lon":120.572179,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buttong","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1099},{"i":1412,"cid":"24AI0007","pid":"P00820718LZ","t":"Construction of Flood Control Structure along Aloragat River, Barangay Bugayong-Vacante, Binalonan, Pangasinan (Package 4)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48950141.11,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-03-26","lat":16.082877,"lon":120.572493,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.04,"wp":[16.08321,120.57235],"wst":"matched","br":"Bugayong-Vacante","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1100},{"i":1413,"cid":"23AA0102","pid":"P00725607LZ","t":"Construction of Flood Control along Bislak River, Sitio Baraniw Sito 2, Barangay 34, Cabaruan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS / MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899991.3,"abc":58799114.62,"fy":"2023","sd":"03/13/2023","cd":"2023-08-15","lat":18.217461,"lon":120.572683,"sm":89,"fm":89,"tm":89,"am":751,"md":2.8,"ls":"adjacent","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"34","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1101},{"i":1414,"cid":"24AA0131","pid":"P00821464LZ","t":"Construction of Flood Mititgation Structure along Laoag River Basin Buttong Creek, Barangay Buttong, Laoag City, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":9799193.74,"abc":9799199.31,"fy":"2024","sd":"03/04/2024","cd":"2024-05-27","lat":18.182874,"lon":120.572966,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buttong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1102},{"i":1415,"cid":"22AI0075","pid":"P00620464LZ","t":"Construction of Flood Control Structure along Mitura and Allied River, Sta. 0+000 - Sta. 0+715, Urdaneta City, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":43924227.04,"abc":44100000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-05","lat":15.98878,"lon":120.5731,"sm":434,"fm":434,"tm":434,"am":434,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":715.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1103},{"i":1416,"cid":"23AA0025","pid":"P00726041LZ","t":"Construction of Flood Control Structure along Bislak River, Downstream Bacarra Br., Sitio Pannabuan, Barangay Ganagan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY / TMT CONSTRUCTION","c":48999946.32,"abc":48999948.98,"fy":"2023","sd":"02/13/2023","cd":"2023-08-15","lat":18.211991,"lon":120.573244,"sm":89,"fm":89,"tm":89,"am":751,"md":3.19,"ls":"outside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ganagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.67,"value":3.19,"text":"The pin is 3.2 km outside Bacarra, Ilocos Norte, the nearest municipality the record claims. It falls in Laoag City, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":285},{"i":1417,"cid":"23A00142","pid":"P00725584LZ","t":"Construction of Additional Slope Protection at Bulilising Bridge (Upstream), Batac City, Ilocos Norte","w":"Construction of Revetment","rg":"Region I","pv":"ILOCOS NORTE","mu":"CITY OF BATAC (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":19299446.77,"abc":19300000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-12-07","lat":18.06505,"lon":120.57352,"sm":367,"fm":367,"tm":367,"am":367,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1104},{"i":1418,"cid":"23CJ0016","pid":"P00726747LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package C), Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48016060.76,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-06-19","lat":15.560961,"lon":120.573542,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.47,"wp":[15.57297,120.57944],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1105},{"i":1419,"cid":"22AI0070","pid":"P00620471LZ","t":"Rehabilitation of Linmansangan Creek, Sta. 0+000 - Sta. 1+494, Brgy. Linmansangan, Binalonan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":28939954.5,"abc":29400000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-18","lat":16.0491,"lon":120.5736,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Linmansangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Linmansangan","len":1494.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1106},{"i":1420,"cid":"23AA0109","pid":"P00725614LZ","t":"Construction of Paayas Seawall, Burgos, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BURGOS (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":96499558.61,"abc":97999786.23,"fy":"2023","sd":"03/13/2023","cd":"2023-11-15","lat":18.505627,"lon":120.574292,"sm":258,"fm":258,"tm":258,"am":258,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1107},{"i":1421,"cid":"24CB0029","pid":"P00820804LZ","t":"Construction of Flood Control Structure along Calungusan River, Orion, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"ORION (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"A.T.P. CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-08-09","lat":14.64279,"lon":120.5744,"sm":1042,"fm":1042,"tm":1042,"am":1042,"md":0.0,"ls":"inside","ww":"Calungusan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1108},{"i":1422,"cid":"23CJ0136","pid":"P00727290LZ","t":"Rehabilitation of Slope Protection Structure with Steel Sheet Pile Foundation along Tarlac Flood Control (Right Dike), Carangian Section (Package P), Tarlac City, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":95733748.94,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-20","lat":15.483342,"lon":120.574519,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package P","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1109},{"i":1423,"cid":"23CI0038","pid":"P00727137LZ","t":"Construction of Rerinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Pampang, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MJBZ BUILDERS AND TRADING","c":29357041.77,"abc":29397388.52,"fy":"2023","sd":"03/06/2023","cd":"2023-05-23","lat":15.152297,"lon":120.574539,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.04,"wp":[15.15261,120.57455],"wst":"matched","br":"Pampang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1110},{"i":1424,"cid":"23CI0144","pid":"P00740620LZ","t":"Construction of Drainage with Outfall at Brgy. Amsic, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"QUANTUMWAYS BUILDERS ROAD CONSTRUCTION","c":4755664.53,"abc":4899809.62,"fy":"2023","sd":"05/22/2023","cd":"2023-07-20","lat":15.1522,"lon":120.5746,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Amsic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1111},{"i":1425,"cid":"23AI0009","pid":"P00726648LZ","t":"Construction of Flood Control Structure along Aloragat River, Brgy. Bugayong-Vacante, Binalonan, Pangasinan (Package 3)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48884891.57,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-28","lat":16.08361,"lon":120.5747,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.09,"wp":[16.0843,120.57435],"wst":"matched","br":"Bugayong-Vacante","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1112},{"i":1426,"cid":"21CJ0008","pid":"P00526053LZ","t":"Rehabilitation of Flood Control Structures along Tarlac River Control Right Dike, Mlayep Section (Phase III), Malayep, Gerona, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"Gerona","deo":"Tarlac District Engineering Office","co":"R-II BUILDERS, INC.","c":41894120.84,"abc":44100000.0,"fy":"2021","sd":"03/28/2022","cd":"2022-09-19","lat":15.576403,"lon":120.574857,"sm":580,"fm":null,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.17,"wp":[15.57499,120.57432],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1113},{"i":1427,"cid":"22A00171","pid":"P00620779LZ","t":"Construction of Flood Control and Drainage Structure along Payas Creek, Brgy. San Marcos, San Nicolas, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":96499999.74,"abc":96500000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-10-18","lat":18.167289,"lon":120.57499,"sm":1340,"fm":1340,"tm":1340,"am":1340,"md":0.0,"ls":"inside","ww":"Payas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Marcos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1114},{"i":1428,"cid":"24CJ0230","pid":"P00823347LZ","t":"Construction of Slope Protection along Baket-Baket River (Segment H), Moncada, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"MONCADA (TARLAC)","deo":"Tarlac District Engineering Office","co":"LAMASIA BUILDERS AND SUPPLY CORP.","c":28950000.0,"abc":29400000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-11-15","lat":15.723394,"lon":120.575086,"sm":985,"fm":985,"tm":985,"am":985,"md":0.0,"ls":"inside","ww":"Baket-Baket","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment H","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1115},{"i":1429,"cid":"23CI0086","pid":"P00740354LZ","t":"Construction of Dike with Slope Protection and Groundsill along Sapang Balen Creek (Leftside), Mabalacat City, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"WRO CONST. CORP. / GRACE CONSTRUCTION CORPORATION","c":72344716.92,"abc":72367705.78,"fy":"2023","sd":"04/12/2023","cd":"2023-08-22","lat":15.208343,"lon":120.575202,"sm":840,"fm":840,"tm":840,"am":61,"md":0.01,"ls":"boundary","ww":"Sapang Balen","wn":"Sapang Balen","wd":12.97,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1116},{"i":1430,"cid":"24CI0071","pid":"P00844763LZ","t":"Construction of Flood Control Structure with Road Dike along Sabangbalen River Phase 2, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48984910.79,"abc":48992753.92,"fy":"2024","sd":"04/26/2024","cd":"2024-10-09","lat":15.225079,"lon":120.575375,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sabangbalen","wn":"Sapang Balen","wd":11.37,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1117},{"i":1431,"cid":"23CJ0015","pid":"P00726746LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package B), Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":48019996.41,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-29","lat":15.558878,"lon":120.575386,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":1.42,"wp":[15.56321,120.58789],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1118},{"i":1432,"cid":"23AI0005","pid":"P00726647LZ","t":"Construction of Flood Control Structure along Aloragat River, Brgy. Bugayong-Vacante, Binalonan, Pangasinan (Package 2)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48929299.85,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-28","lat":16.08444,"lon":120.5758,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.06,"wp":[16.08491,120.57548],"wst":"matched","br":"Bugayong-Vacante","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1119},{"i":1433,"cid":"24CJ0252","pid":"P00846017LZ","t":"Construction of Flood Control Structure along Tarlac River Control (Right Dike), Villa Paz-Dicolor Section, Gerona, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS / T2B3 BUILDERS AND SUPPLIES CORP.","c":100000000.0,"abc":99000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-05-08","lat":15.575769,"lon":120.576108,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.15,"wp":[15.57452,120.57563],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":609},{"i":1434,"cid":"23CJ0084","pid":"P00740370LZ","t":"Rehabilitation of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Carangian Section (Package I), Tarlac City, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":70202319.37,"abc":72375000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-11-09","lat":15.483072,"lon":120.5764,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.21,"wp":[15.48495,120.57628],"wst":"matched","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1120},{"i":1435,"cid":"23AB0097","pid":"P00727058LZ","t":"Construction of Flood Control Structure along San Lorenzo Creek, Both Bank, Brgy. San Lorenzo, San Nicolas, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":33270657.32,"abc":34300000.0,"fy":"2023","sd":"04/24/2023","cd":"2023-12-13","lat":18.13907,"lon":120.57652,"sm":1340,"fm":1340,"tm":1340,"am":1340,"md":0.0,"ls":"inside","ww":"San Lorenzo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1121},{"i":1436,"cid":"23CI0034","pid":"P00727138LZ","t":"Construction of Rerinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION","c":48786956.39,"abc":48789354.31,"fy":"2023","sd":"03/06/2023","cd":"2023-06-20","lat":15.153453,"lon":120.576656,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.18,"wp":[15.15201,120.57592],"wst":"matched","br":"Amsic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1122},{"i":1437,"cid":"22PD0018","pid":"P00620991LZ","t":"Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries) Sta. 0+190 - Sta. 0+640, Baguio City","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/10/2022","cd":"2023-01-20","lat":16.379716,"lon":120.576768,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.08,"wp":[16.37979,120.57754],"wst":"matched","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1123},{"i":1438,"cid":"23CJ0146","pid":"P00742370LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Malayep Section, Gerona, Tarlac (Package A)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"GERONA (TARLAC)","deo":"Tarlac District Engineering Office","co":"L.S.D.  CONSTRUCTION & SUPPLIES","c":48435773.97,"abc":49500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-06-23","lat":15.575326,"lon":120.577205,"sm":580,"fm":580,"tm":580,"am":580,"md":0.0,"ls":"inside","ww":"Tarlac","wn":"Tarlac River","wd":0.14,"wp":[15.57412,120.57675],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[1404,1399],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CJ0142 to 23CJ0146) cover the same site, together worth PHP 164,795,244.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":542},{"i":1439,"cid":"22CI0104","pid":"P00631256LZ","t":"Construction of Drainage Canal along Manila North Road (MNR) Brgy. San Francisco, Mabalacat City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"WNR CONSTRUCTION AND TRADING","c":24472978.8,"abc":24493886.45,"fy":"2022","sd":"03/24/2022","cd":"2022-10-19","lat":15.215224,"lon":120.577241,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1124},{"i":1440,"cid":"23CH0063","pid":"P00740609LZ","t":"Construction of Slope Protection along Sapang Uyung, Lambac Section, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"DMDANAN CONSTRUCTION AND TRADING","c":29393286.85,"abc":29399647.5,"fy":"2023","sd":"05/08/2023","cd":"2023-10-19","lat":14.98827,"lon":120.577717,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1125},{"i":1441,"cid":"24CJ0171","pid":"P00823477LZ","t":"Construction of Paniqui Drainage System, Paniqui, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"PANIQUI (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-03-04","lat":15.668383,"lon":120.578017,"sm":1092,"fm":1092,"tm":1092,"am":1092,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1126},{"i":1442,"cid":"22CB0086","pid":"P00640514LZ","t":"Construction of Revetment at Pandam River, Phase 2, Orion, Bataan","w":"Construction of Revetment","rg":"Region III","pv":"BATAAN","mu":"ORION (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR","c":34650000.0,"abc":34300000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-01-25","lat":14.608183,"lon":120.578086,"sm":1042,"fm":1042,"tm":1042,"am":1042,"md":0.0,"ls":"inside","ww":"Pandam","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":870},{"i":1443,"cid":"23AA0147","pid":"P00727042LZ","t":"Construction of Flood Control Structure along Bislak River, Barangay Casilian to Barangay Cabaruan, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":48999509.81,"abc":48999555.95,"fy":"2023","sd":"03/29/2023","cd":"2023-11-13","lat":18.270563,"lon":120.578575,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casilian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1127},{"i":1444,"cid":"23AI0004","pid":"P00726646LZ","t":"Construction of Flood Control Structure along Aloragat River, Brgy. Bugayong-Vacante, Binalonan, Pangasinan (Package 1)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48909367.12,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-28","lat":16.08694,"lon":120.5786,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Aloragat","wn":"Aloragat River","wd":0.05,"wp":[16.08728,120.57825],"wst":"matched","br":"Bugayong-Vacante","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1128},{"i":1445,"cid":"24AI0037","pid":"P00820720LZ","t":"Construction of Flood Control Structure along Aloragat River, Barangay Rosario, Pozorrubio, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"POZORRUBIO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RANIA CONSTRUCTION AND SUPPLIES / J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.)","c":48926269.37,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-04-24","lat":16.087658,"lon":120.57866,"sm":1168,"fm":1168,"tm":1168,"am":205,"md":0.16,"ls":"boundary","ww":"Aloragat","wn":"Aloragat River","wd":0.0,"wp":[16.08767,120.57865],"wst":"matched","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1129},{"i":1446,"cid":"22CB0064","pid":"P00631174LZ","t":"Construction of Retaining Wall at Sitio Mabuhay, Barangay Cabcaben, Mariveles, Bataan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BATAAN","mu":"MARIVELES (BATAAN)","deo":"Bataan 2nd District Engineering Office","co":"R.Z. TIGAS CONSTRUCTION AND TRADING","c":19760720.0,"abc":19962360.0,"fy":"2022","sd":"03/14/2022","cd":"2022-08-08","lat":14.457868,"lon":120.578753,"sm":943,"fm":943,"tm":943,"am":943,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabcaben","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1130},{"i":1447,"cid":"23AA0292","pid":"P00740547LZ","t":"Construction of Flood Control, Barangay 37-A, Casilian Proper, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"REMAR CONSTRUCTION","c":4899700.57,"abc":4899860.53,"fy":"2023","sd":"05/08/2023","cd":"2023-10-03","lat":18.264604,"lon":120.578979,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"37-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1131},{"i":1448,"cid":"24AI0246","pid":"P00843186LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied Rivers, Package 3, Pozorrubio, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"POZORRUBIO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":86631647.76,"abc":86850000.0,"fy":"2024","sd":"06/07/2024","cd":"2024-08-05","lat":16.0956,"lon":120.578983,"sm":1168,"fm":1168,"tm":1168,"am":1168,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1132},{"i":1449,"cid":"24A00309","pid":"P00821490LZ","t":"Construction of Flood Control Mitigation Structure along Agno River and Allied Rivers, Rosales, Pangasinan (Package 1)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48248752.17,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-15","lat":15.883007,"lon":120.579218,"sm":1215,"fm":1215,"tm":1215,"am":1634,"md":1.65,"ls":"adjacent","ww":"Agno","wn":"Agno River","wd":0.05,"wp":[15.88261,120.57944],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1133},{"i":1450,"cid":"23CI0043","pid":"P00740639LZ","t":"Improvement/Rehabilitation/Construction of Drainage Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MICKAJETTE CONSTRUCTION AND TRADING","c":38356262.46,"abc":39185560.29,"fy":"2023","sd":"03/24/2023","cd":"2023-08-20","lat":15.136316,"lon":120.579313,"sm":61,"fm":61,"tm":null,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[1008],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 43,250,225.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":950},{"i":1451,"cid":"22PA0228","pid":"P00637010LZ","t":"Construction of Soot Flood Control Structure, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":92109279.07,"abc":96499974.86,"fy":"2022","sd":"12/28/2022","cd":"2023-10-01","lat":17.631924,"lon":120.628169,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1134},{"i":1452,"cid":"21PA0240","pid":"P00632782LZ","t":"Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48997500.0,"abc":49000000.0,"fy":"2022","sd":"01/07/2022","cd":"2022-07-21","lat":17.632038,"lon":120.628239,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1135},{"i":1453,"cid":"24DB0106","pid":"P00845819LZ","t":"Rehabilitation of Slope Protection Structure along Lian River, Lian Side (Downstream), Lian, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":148500000.0,"abc":148500000.0,"fy":"2024","sd":"08/07/2024","cd":"2024-11-15","lat":14.0554,"lon":120.6284,"sm":774,"fm":774,"tm":774,"am":774,"md":0.0,"ls":"inside","ww":"Lian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1136},{"i":1454,"cid":"25CJ0038","pid":"P00920485LZ","t":"Construction of Flood Control Structure along Inerangan River, Segment 14, Ramos, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":70167867.76,"abc":72375000.0,"fy":"2025","sd":"02/11/2025","cd":"2025-04-18","lat":15.682808,"lon":120.628406,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Inerangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment 14","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1137},{"i":1455,"cid":"22PA0335","pid":"P00637063LZ","t":"Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48997500.0,"abc":48999918.22,"fy":"2022","sd":"12/28/2022","cd":"2023-06-05","lat":17.6343,"lon":120.6287,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1138},{"i":1456,"cid":"24CJ0051","pid":"P00820860LZ","t":"Construction of Flood Control Structure along Ungot Creek (Segment S), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":45000000.0,"abc":44100000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-05-18","lat":15.460722,"lon":120.628716,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment S","dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":670},{"i":1457,"cid":"24CJ0047","pid":"P00838535LZ","t":"Construction of Slope Protection Structure along Ungot Creek, Tarlac City, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-09-03","lat":15.46141,"lon":120.629194,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":637},{"i":1458,"cid":"23D00007","pid":"P00726550LZ","t":"Rehabilitation of Damaged Slope Protection at Lian River (Downstream), Nasugbu and Lian, Batangas","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"NASUGBU (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":67500651.86,"abc":67550000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-19","lat":14.055594,"lon":120.629506,"sm":1014,"fm":1014,"tm":180,"am":774,"md":0.03,"ls":"boundary","ww":"Lian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":52.78,"text":"The record contradicts itself: the municipality field and the pin point to Nasugbu, Batangas, but the title names Batangas City, Batangas, 53 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":491},{"i":1459,"cid":"23AA0129","pid":"P00725645LZ","t":"Construction of Flood Control Structure along Bislak River, Brgy. San Ramon, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / HEKLER BUILDERS CORP.","c":62720200.89,"abc":62724665.91,"fy":"2023","sd":"03/13/2023","cd":"2023-12-15","lat":18.23797,"lon":120.62958,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Ramon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1139},{"i":1460,"cid":"24CI0093","pid":"P00846009LZ","t":"Construction of Flood Mitigation Structure, Brgy. Santo Rosario, Magalang, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ARROWHEAD CONSTRUCTION","c":9880733.74,"abc":9889938.72,"fy":"2024","sd":"04/26/2024","cd":"2024-08-20","lat":15.254056,"lon":120.630084,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1140},{"i":1461,"cid":"23CJ0155","pid":"P00727286LZ","t":"Construction of Flood Control Structure with Steel Sheet Pile Foundation along Ungot Creek (Package U), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"CHIARA2300 INCORPORATED / HIGH STRENGTH DEV. CORPORATION","c":96499308.66,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-08-18","lat":15.46165,"lon":120.630103,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package U","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1141},{"i":1462,"cid":"22CG0028","pid":"P00631233LZ","t":"Construction of Drainage System at Dolores, Concepcion and Maliwalu, Bacolor, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) / STARDON CONSTRUCTION AND TRADING","c":37228187.0,"abc":39200000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":15.061184,"lon":120.630834,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1142},{"i":1463,"cid":"22CI0006","pid":"P00632841LZ","t":"Construction of Concrete Slope Protection Structure along Sapangbalen Creek, Station 12+768 to Station 14+587 (R/D), Barangay Paralayunan, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":48993897.23,"abc":48994185.72,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":15.25495,"lon":120.63089,"sm":840,"fm":840,"tm":840,"am":860,"md":1.54,"ls":"adjacent","ww":"Sapangbalen","wn":"Sapang Balen","wd":6.22,"wp":[15.31113,120.63319],"wst":"matched","br":"Paralayunan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1143},{"i":1464,"cid":"23CJ0153","pid":"P00727285LZ","t":"Construction of Flood Control Structure with Steel Sheet Pile Foundation along Ungot Creek (Package Q), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":95495483.68,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-20","lat":15.463042,"lon":120.631347,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Ungot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package Q","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1144},{"i":1465,"cid":"22AA0128","pid":"P00621440LZ","t":"Construction of Flood Control Structures along Bislak River, Brgy. San Ramon, 0+000-0+836, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48999741.36,"abc":48999741.48,"fy":"2022","sd":"04/04/2022","cd":"2022-11-15","lat":18.236425,"lon":120.631628,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Ramon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1145},{"i":1466,"cid":"24E00017","pid":"P00821359LZ","t":"Construction of Flood Control Structure along Abra de Ilog River, Sitio Kuli-Kuli Section, Armado, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":241246624.5,"abc":241249999.9,"fy":"2024","sd":"03/02/2024","cd":"2024-11-15","lat":13.313509,"lon":120.631839,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":"Abra de Ilog","wn":"Abra de Ilog River","wd":13.01,"wp":[13.40699,120.70461],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":51,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.72,"value":13.01,"text":"The title names Abra de Ilog, which OpenStreetMap maps through the stated municipality, but the pin is 13.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":180},{"i":1467,"cid":"23CK0040","pid":"P00725736LZ","t":"Rehabilitation of Existing Dike along Lucung River (Jefmin Section, Left Bank), D/S of Santiago Bridge, Package 2, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":49214625.15,"abc":49214647.49,"fy":"2023","sd":"02/07/2023","cd":"2023-07-03","lat":15.3313,"lon":120.6319,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[1567,1031,1849],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0040 to 23CK0043) cover the same site, together worth PHP 193,395,349.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":474},{"i":1468,"cid":"23CI0130","pid":"P00742367LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Brgy. Mawaque, Mabalacat, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19769259.83,"abc":19776927.35,"fy":"2023","sd":"05/24/2023","cd":"2023-10-05","lat":15.2156,"lon":120.6322,"sm":840,"fm":840,"tm":840,"am":860,"md":0.67,"ls":"boundary","ww":"Quitangil","wn":"Quitangil Creek","wd":0.71,"wp":[15.22167,120.63444],"wst":"matched","br":"Mawaque","len":null,"ph":null,"dup":[1469,1470],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 183,781,859.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1009},{"i":1469,"cid":"23CI0141","pid":"P00740320LZ","t":"Construction of Concrete Slope Protection along Quitangil Creek (Upstream of Sta. Lucia Bridge) at Barangay Sapang Biabas, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"R.D. POLICARPIO & COMPANY INC.","c":67547874.33,"abc":67547937.63,"fy":"2023","sd":"05/22/2023","cd":"2023-11-17","lat":15.2156,"lon":120.6322,"sm":840,"fm":840,"tm":840,"am":860,"md":0.67,"ls":"boundary","ww":"Quitangil","wn":"Quitangil Creek","wd":0.71,"wp":[15.22167,120.63444],"wst":"matched","br":"Sapang Biabas","len":null,"ph":null,"dup":[1468,1470],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 183,781,859.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":828},{"i":1470,"cid":"24CI0009","pid":"P00838357LZ","t":"Construction of Reinforced Concrete Slope Protection Structure (Leftside) along Quitangil Creek, Barangay Sapangbiabas, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":96464724.6,"abc":96483457.97,"fy":"2024","sd":"03/14/2024","cd":"2024-09-11","lat":15.2156,"lon":120.6322,"sm":840,"fm":840,"tm":840,"am":860,"md":0.67,"ls":"boundary","ww":"Quitangil","wn":"Quitangil Creek","wd":0.71,"wp":[15.22167,120.63444],"wst":"matched","br":"Sapangbiabas","len":null,"ph":null,"dup":[1468,1469],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":2,"text":"2 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 183,781,859.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1010},{"i":1471,"cid":"22PA0229","pid":"P00639322LZ","t":"Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":94102968.15,"abc":96499977.01,"fy":"2022","sd":"12/28/2022","cd":"2023-10-01","lat":17.636356,"lon":120.632367,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1146},{"i":1472,"cid":"24AA0091","pid":"P00820689LZ","t":"Construction of Flood Control Structure along Sarrat Padsan River Basin, Barangays San Lorenzo and San Miguel, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":19599469.7,"abc":19599490.62,"fy":"2024","sd":"02/14/2024","cd":"2024-07-03","lat":18.13196,"lon":120.632839,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Sarrat Padsan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1147},{"i":1473,"cid":"24CJ0042","pid":"P00821237LZ","t":"Construction of Flood Control Structure along O'Donnell River, Moriones-Balanti Section (Section A), Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"SAN JOSE (TARLAC)","deo":"Tarlac District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-18","lat":15.684675,"lon":120.633047,"sm":432,"fm":1298,"tm":432,"am":1200,"md":14.92,"ls":"outside","ww":"O'Donnell","wn":"O' Donnel River","wd":24.61,"wp":[15.47243,120.56484],"wst":"matched","br":null,"len":null,"ph":"Section A","dup":[],"run":[],"cl":[],"L":"records","s":87,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.89,"value":14.92,"text":"The pin is 14.9 km outside City of Tarlac, Tarlac, the nearest municipality the record claims. It falls in Ramos, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.81,"value":24.61,"text":"The title names O'Donnell, which OpenStreetMap maps through the stated municipality, but the pin is 24.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":7},{"i":1474,"cid":"24CJ0006","pid":"P00820861LZ","t":"Construction of Slope Protection Structure along Inerangan River (Segment A), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-24","lat":15.684597,"lon":120.633092,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Inerangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment A","dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":638},{"i":1475,"cid":"24AA0362","pid":"P00844697LZ","t":"Rehabilitation of River Wall (Sulbec Section), Phase 2, Pasuquin, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PASUQUIN (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":19599951.64,"abc":19599954.89,"fy":"2024","sd":"04/01/2024","cd":"2024-08-21","lat":18.346472,"lon":120.633184,"sm":1110,"fm":1110,"tm":1110,"am":1110,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1148},{"i":1476,"cid":"22CH0085","pid":"P00639360LZ","t":"Construction of Slope Protection Structure at Sapang Maragul River Bank, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":72358811.49,"abc":72374318.55,"fy":"2022","sd":"06/01/2022","cd":"2022-11-27","lat":14.979625,"lon":120.633313,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Sapang Maragul","wn":"Sapang Maragul","wd":0.44,"wp":[14.97739,120.63674],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1149},{"i":1477,"cid":"22AA0134","pid":"P00621587LZ","t":"Construction of Flood Mitigation Facilities along Laoag River, Sta. Magdalena Creek (Sinigpit), Barangay 8, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY / JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION","c":34299755.73,"abc":34299755.73,"fy":"2022","sd":"04/04/2022","cd":"2023-03-02","lat":18.136394,"lon":120.6334,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"8","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1150},{"i":1478,"cid":"23CH0014","pid":"P00727130LZ","t":"Construction of Slope Protection along Sapang Maragul, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"CEDAR CONSTRUCTION","c":18818006.65,"abc":19599212.92,"fy":"2023","sd":"03/22/2023","cd":"2023-08-18","lat":14.979052,"lon":120.633536,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1151},{"i":1479,"cid":"23AI0089","pid":"P00742279LZ","t":"Construction/Rehabilitation of Drainage Canal at Rosales, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":9669550.35,"abc":9800000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-07-07","lat":15.894667,"lon":120.633564,"sm":1215,"fm":1215,"tm":null,"am":1215,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1152},{"i":1480,"cid":"24AI0035","pid":"P00824656LZ","t":"Construction of Flood Control Structure along Totonoguen River, Brgy. Zone 5, Rosales, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":22481351.38,"abc":22540000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-15","lat":15.890879,"lon":120.634063,"sm":1215,"fm":140,"tm":1215,"am":1215,"md":0.0,"ls":"inside","ww":"Totonoguen","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zone 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1153},{"i":1481,"cid":"23AA0032","pid":"P00726634LZ","t":"Construction of Flood Mitigation Facilities within Major River Basins and Principal River along Laoag (Sarrat) River, Barangay 8, San Antonio, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY / BJMJB CONSTRUCTION & SUPPLY","c":19598647.33,"abc":19599637.27,"fy":"2023","sd":"02/13/2023","cd":"2023-06-20","lat":18.137761,"lon":120.634103,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Principal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"8","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1154},{"i":1482,"cid":"24CH0097","pid":"P00823368LZ","t":"Rehabilitation of Slope Protection Works including Roads along Sapang Maragul River Dike (Betis Section), Betis, Guagua, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96494237.11,"abc":96499802.02,"fy":"2024","sd":"05/09/2024","cd":"2025-01-18","lat":14.975917,"lon":120.634123,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Sapang Maragul","wn":"Sapang Maragul","wd":0.18,"wp":[14.97548,120.63574],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1155},{"i":1483,"cid":"22CH0042","pid":"P00621456LZ","t":"Construction of Slope Protection along Pasak River, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":48842884.77,"abc":48850032.21,"fy":"2022","sd":"04/13/2022","cd":"2022-10-09","lat":14.961194,"lon":120.634202,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Pasak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1156},{"i":1484,"cid":"23CI0037","pid":"P00727136LZ","t":"Construction of Reinforced Concrete Slope Protection along Sapang Balen Creek, Brgy. Santo Rosario, Magalang, to Brgy. Paralayunan, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":48990144.99,"abc":48993983.79,"fy":"2023","sd":"03/06/2023","cd":"2023-05-22","lat":15.25685,"lon":120.634468,"sm":840,"fm":840,"tm":840,"am":860,"md":1.89,"ls":"adjacent","ww":"Sapang Balen","wn":"Sapang Balen","wd":6.01,"wp":[15.31113,120.63319],"wst":"matched","br":"Santo Rosario","len":null,"ph":null,"dup":[1485],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,274,802.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":899},{"i":1485,"cid":"23CI0117","pid":"P00742143LZ","t":"Construction/Repair of Reinforced Concrete Slope Protection Structure along Sapangbalen Creek from Brgy. San Roque, Magalang to Brgy. Paralayunan, Mabalacat City, Pampanga (Left Dike)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING / FRAMECON BUILDERS","c":69284656.96,"abc":69286137.0,"fy":"2023","sd":"05/16/2023","cd":"2023-11-11","lat":15.25685,"lon":120.634468,"sm":840,"fm":840,"tm":840,"am":860,"md":1.89,"ls":"adjacent","ww":"Sapangbalen","wn":"Sapang Balen","wd":6.01,"wp":[15.31113,120.63319],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[1484],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,274,802.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":829},{"i":1486,"cid":"24CI0027","pid":"P00838530LZ","t":"Construction of Drainage along Arayat Magalang Mabalacat Road, Brgy Sto. Rosario, Magalang, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":19576592.61,"abc":19585897.93,"fy":"2024","sd":"04/02/2024","cd":"2025-01-15","lat":15.25685,"lon":120.6345,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1157},{"i":1487,"cid":"23AA0023","pid":"P00726047LZ","t":"Construction of Flood Control Project along Sarrat Padsan River Basin, Barangay San Lorenzo and Barangay 10 San Miguel, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY","c":48999776.7,"abc":48999871.69,"fy":"2023","sd":"02/17/2023","cd":"2023-08-17","lat":18.128085,"lon":120.634536,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Sarrat Padsan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1158},{"i":1488,"cid":"23AA0022","pid":"P00726046LZ","t":"Construction of Flood Control Project along Sarrat Padsan River Basin, Barangay 8 San Antonio and Barangay 9 San Lorenzo, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48999159.08,"abc":48999623.74,"fy":"2023","sd":"02/17/2023","cd":"2023-07-17","lat":18.138507,"lon":120.634669,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Sarrat Padsan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"8 San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1159},{"i":1489,"cid":"22CH0044","pid":"P00637025LZ","t":"Rehabilitation/Improvement of Guagua Pasak River, Phase 3, Guagua, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC. / CEDAR CONSTRUCTION","c":96489698.91,"abc":96499816.45,"fy":"2022","sd":"04/18/2022","cd":"2023-02-11","lat":14.964245,"lon":120.634701,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Guagua Pasak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1160},{"i":1490,"cid":"25CJ0127","pid":"P00941410LZ","t":"Construction of Flood Control Structure along Masalasa Creek (Segment 52), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"WHITE OAK CONSTRUCTION & DEVELOPMENT CORP.","c":24125000.0,"abc":24125000.0,"fy":"2025","sd":"02/17/2025","cd":"2025-03-19","lat":15.478608,"lon":120.634742,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Masalasa","wn":"Masalasa Creek","wd":4.21,"wp":[15.47632,120.59555],"wst":"matched","br":null,"len":null,"ph":"Segment 52","dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.21,"text":"The title names Masalasa, which OpenStreetMap maps through the stated municipality, but the pin is 4.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":401},{"i":1491,"cid":"24CJ0025","pid":"P00820864LZ","t":"Construction of Slope Protection Structure along Susubaen Creek (Segment B), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-11-06","lat":15.686353,"lon":120.635581,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Susubaen","wn":"Susubaen River","wd":0.01,"wp":[15.68626,120.63553],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":639},{"i":1492,"cid":"23AI0082","pid":"P00727335LZ","t":"Construction of Flood Control Structure along Mitura River, Brgy.Sobol - Brgy. Toboy, Asingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"SAN NICOLAS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":39113562.58,"abc":39200000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-28","lat":16.019823,"lon":120.635585,"sm":77,"fm":1341,"tm":77,"am":77,"md":0.0,"ls":"inside","ww":"Mitura","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Toboy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.42,"text":"The record contradicts itself: the title and the pin point to Asingan, Pangasinan, but the municipality field names San Nicolas, Pangasinan, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":553},{"i":1493,"cid":"23AA0031","pid":"P00726635LZ","t":"Construction of Flood Mitigation Facilities within Major River Basins and Principal River along Laoag (Sarrat) River, Barangay 10, San Miguel, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"A.P.B. CONSTRUCTION","c":19599364.97,"abc":19599772.27,"fy":"2023","sd":"02/17/2023","cd":"2023-06-23","lat":18.123859,"lon":120.635608,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Principal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"10","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1161},{"i":1494,"cid":"23AA0020","pid":"P00726045LZ","t":"Construction of Flood Control Project along Sarrat Padsan River Basin from Barangays 18, 17, 10, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"CMG JR. BUILDERS","c":39199013.19,"abc":39199668.35,"fy":"2023","sd":"02/13/2023","cd":"2023-06-20","lat":18.123191,"lon":120.636078,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Sarrat Padsan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"18","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1162},{"i":1495,"cid":"23PA0257","pid":"P00740307LZ","t":"Construction of Naguillan Flood Control Structure, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / RM30 PSG CONSTRUCTION CORPORATION","c":144747500.0,"abc":144749894.4,"fy":"2023","sd":"11/23/2023","cd":"2024-06-24","lat":17.633216,"lon":120.636357,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1163},{"i":1496,"cid":"24AA0085","pid":"P00820683LZ","t":"Construction of Flood Control Structure along Padsan River, Barangay 17 San Felipe, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":19599501.36,"abc":19599501.89,"fy":"2024","sd":"03/01/2024","cd":"2024-06-25","lat":18.124896,"lon":120.636578,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.12,"wp":[18.12565,120.6374],"wst":"matched","br":"17 San Felipe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1164},{"i":1497,"cid":"24AA0087","pid":"P00820685LZ","t":"Construction of Flood Control Structure along Padsan River, Barangay 18 San Isidro, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":29399919.49,"abc":29399924.1,"fy":"2024","sd":"02/27/2024","cd":"2024-08-13","lat":18.124755,"lon":120.636777,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.12,"wp":[18.12548,120.63757],"wst":"matched","br":"18 San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1165},{"i":1498,"cid":"24CJ0258","pid":"P00846014LZ","t":"Construction of Bank Protection Structure along Susubaen Creek (Segment B), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":55000000.0,"abc":54450000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-08-27","lat":15.6844,"lon":120.637133,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Susubaen","wn":"Susubaen River","wd":0.09,"wp":[15.68499,120.63775],"wst":"matched","br":null,"len":null,"ph":"Segment B","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":719},{"i":1499,"cid":"24CJ0202","pid":"P00846010LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation and Road Component along Inerangan River (Segment O), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES / NIECER TRADING AND BUILDER COMPANY INC.","c":50000000.0,"abc":49500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-08-10","lat":15.677161,"lon":120.637189,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Inerangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Segment O","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":720},{"i":1500,"cid":"22PA0103","pid":"P00632771LZ","t":"Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49498000.0,"abc":48999893.66,"fy":"2022","sd":"06/20/2022","cd":"2023-02-21","lat":17.565323,"lon":120.720156,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01017,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":721},{"i":1501,"cid":"23AA0149","pid":"P00727044LZ","t":"Construction of Waterway Structure along Banban River, Barangay Banban and Dadaor, Bangui,Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / HERCULES VENTURES INC.","c":19599856.52,"abc":19599851.76,"fy":"2023","sd":"05/18/2023","cd":"2023-07-24","lat":18.500194,"lon":120.720174,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Banban","wn":"Banban River","wd":0.02,"wp":[18.50001,120.7203],"wst":"matched","br":"Banban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1166},{"i":1502,"cid":"23CC0226","pid":"P00726897LZ","t":"Construction of Revetment along Hagonoy River at Barangay Santa Cruz, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS / 121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC","c":72374578.69,"abc":72374954.93,"fy":"2023","sd":"03/14/2023","cd":"2023-09-07","lat":14.815938,"lon":120.720633,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":0.03,"wp":[14.81569,120.72063],"wst":"matched","br":"Santa Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1167},{"i":1503,"cid":"23CE0054","pid":"P00737468LZ","t":"Rehabilitation of Dike at Barangay Bambanaba, Cuyapo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CUYAPO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"KEVIN PAUL CONSTRUCTION","c":9895000.0,"abc":9900000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-04-10","lat":15.742131,"lon":120.720908,"sm":468,"fm":468,"tm":468,"am":468,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bambanaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1168},{"i":1504,"cid":"23CI0111","pid":"P00740356LZ","t":"Construction of Dike with Slope Protection and Groundsill along Quitangil Creek (Rightside), Barangays San Miguel-Turu, Magalang, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ALPIZ CONSTRUCTION & DEVELOPMENT CORPORATION","c":72308180.47,"abc":72366734.57,"fy":"2023","sd":"05/08/2023","cd":"2023-11-03","lat":15.236936,"lon":120.721026,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.0,"wp":[15.23693,120.72103],"wst":"matched","br":"San Miguel-Turu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1169},{"i":1505,"cid":"23PA0021","pid":"P00726395LZ","t":"Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banglolao - Labon, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96500000.0,"abc":96499987.07,"fy":"2023","sd":"04/11/2023","cd":"2024-01-13","lat":17.539696,"lon":120.721223,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[1321,1025,1933],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23PA0019 to 23PA0022) cover the same site, together worth PHP 385,999,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":200},{"i":1506,"cid":"23E00149","pid":"P00740422LZ","t":"Construction of Shore Protection and Coastal Road Development along Barangay Poblacion 1, Sta. Cruz, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":241246327.9,"abc":241249999.3,"fy":"2023","sd":"04/13/2023","cd":"2024-04-06","lat":13.069726,"lon":120.722049,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1170},{"i":1507,"cid":"22AI0105","pid":"P00620964LZ","t":"Construction of Flood Control Structure along Agno and Allied River, Brgy. Agno, Tayug, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":28959119.49,"abc":29400000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-17","lat":16.0175,"lon":120.7225,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Agno","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1171},{"i":1508,"cid":"22PA0126","pid":"P00632754LZ","t":"Construction of Abang Flood Control, Barangay Abang, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49496925.65,"abc":49499860.24,"fy":"2022","sd":"06/15/2022","cd":"2023-01-26","lat":17.523842,"lon":120.722683,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1172},{"i":1509,"cid":"23AA0117","pid":"P00726350LZ","t":"Construction of Flood Mitigating Facilities along Bislak River, Left Bank, US & DS of Bridge, Barangay Bago, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899818.55,"abc":58799632.98,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.340528,"lon":120.722731,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1173},{"i":1510,"cid":"22DB0019","pid":"P00620247LZ","t":"Construction of Riverbank Protection along Binambang River, Sta. 0+147 - 0+600 (Upstream R/S), Balayan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":88142135.0,"abc":88142135.0,"fy":"2022","sd":"02/23/2022","cd":"2022-09-19","lat":13.935884,"lon":120.723053,"sm":124,"fm":124,"tm":124,"am":124,"md":0.0,"ls":"inside","ww":"Binambang","wn":"Binambang River","wd":0.01,"wp":[13.93599,120.7231],"wst":"matched","br":null,"len":453.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1174},{"i":1511,"cid":"23CC0229","pid":"P00726896LZ","t":"Construction of Revetment along Hagonoy River at Barangay San Roque, Hagonoy, Bulucan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":72374651.62,"abc":72374906.57,"fy":"2023","sd":"03/14/2023","cd":"2023-09-28","lat":14.815369,"lon":120.723134,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":0.01,"wp":[14.81547,120.72315],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1175},{"i":1512,"cid":"23DB0017","pid":"P00725836LZ","t":"Construction of Riverbank Protection along Binambang River, Sta. 0 + 000 - Sta. 0 + 536 (Upstream R/S) at Balayan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"VICMAR CONSTRUCTION, INC. / FRANDEL CONSTRUCTION AND DEVELOPMENT CORP.","c":77198760.0,"abc":77198760.0,"fy":"2023","sd":"04/03/2023","cd":"2023-12-14","lat":13.93608,"lon":120.72322,"sm":124,"fm":124,"tm":180,"am":124,"md":0.0,"ls":"inside","ww":"Binambang","wn":"Binambang River","wd":0.01,"wp":[13.93596,120.72317],"wst":"matched","br":null,"len":536.0,"ph":null,"dup":[],"run":[1696,1690],"cl":[],"L":"records","s":53,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":37.54,"text":"The record contradicts itself: the municipality field and the pin point to Balayan, Batangas, but the title names Batangas City, Batangas, 38 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DB0016 to 23DB0018) cover the same site, together worth PHP 250,465,266.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":155},{"i":1513,"cid":"23PA0152","pid":"P00726378LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGANGILANG (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144750000.0,"abc":144749975.5,"fy":"2023","sd":"07/04/2023","cd":"2024-03-12","lat":17.624931,"lon":120.723307,"sm":732,"fm":732,"tm":732,"am":732,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lagben","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1176},{"i":1514,"cid":"22CK0078","pid":"P00621163LZ","t":"Rehabilitation of Existing Dike along Lucung River, (Culatingan Section, Left Bank) Concepcion, Tarlac Sta. 7+449 to Sta. 7+949","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP.","c":57894990.72,"abc":57899344.21,"fy":"2022","sd":"03/26/2022","cd":"2022-10-22","lat":15.33364,"lon":120.72335,"sm":448,"fm":448,"tm":null,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1177},{"i":1515,"cid":"22PA0142","pid":"P00639435LZ","t":"Construction of Colabaoan Flood Control, Malanas River, Barangay Colabaoan, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48998714.0,"abc":48999903.97,"fy":"2022","sd":"06/14/2022","cd":"2022-08-23","lat":17.672464,"lon":120.723516,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":"Malanas","wn":"Malanas River","wd":0.01,"wp":[17.67251,120.72353],"wst":"matched","br":"Colabaoan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1178},{"i":1516,"cid":"22PE0076","pid":"P00639444LZ","t":"Construction (Completion) of Slope Protection Wall Along Sitio Anuvang Tourism Road, Tinongdan, Itogon, Benguet","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CLEB CONSTRUCTION","c":2936230.11,"abc":2940000.0,"fy":"2022","sd":"09/19/2022","cd":"2022-11-12","lat":16.357686,"lon":120.72352,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1179},{"i":1517,"cid":"23A00143","pid":"P00725585LZ","t":"Construction of 100M Canal Lining at Barangay Santiago, Marcos, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"MARCOS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":11234908.42,"abc":11580000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-05-31","lat":17.978593,"lon":120.723648,"sm":935,"fm":935,"tm":935,"am":935,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santiago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1180},{"i":1518,"cid":"22PA0127","pid":"P00632753LZ","t":"Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49497477.49,"abc":49499923.64,"fy":"2022","sd":"06/15/2022","cd":"2023-01-26","lat":17.525369,"lon":120.724074,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1181},{"i":1519,"cid":"22PA0130","pid":"P00639438LZ","t":"Construction of Flood Control Structure, Barangay Abang, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":19597172.35,"abc":19599978.46,"fy":"2022","sd":"06/20/2022","cd":"2023-01-10","lat":17.525964,"lon":120.724613,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1182},{"i":1520,"cid":"23CC0181","pid":"P00742322LZ","t":"Construction of Flood Control Structure, Brgy. San Roque, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":52469994.43,"abc":52469764.51,"fy":"2023","sd":"03/27/2023","cd":"2023-11-21","lat":14.815056,"lon":120.724621,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1183},{"i":1521,"cid":"23A00172","pid":"P00727250LZ","t":"Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Calambeg, Piddig, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PIDDIG (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY / SOLID NORTH CONSTRUCTION","c":97464828.98,"abc":97465000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-07-24","lat":18.201506,"lon":120.725063,"sm":1125,"fm":1125,"tm":1125,"am":1125,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calambeg","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1184},{"i":1522,"cid":"24CC0179","pid":"P00823357LZ","t":"Construction/lmprovement of Flood Mitigation Structure at Mercado, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77194894.02,"abc":77199917.0,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.822932,"lon":120.726032,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1185},{"i":1523,"cid":"23PA0053","pid":"P00727258LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Barangay Presentar-Aguet, Lagangilang, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGANGILANG (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48248433.0,"abc":48249882.28,"fy":"2023","sd":"04/04/2023","cd":"2023-10-07","lat":17.609312,"lon":120.72628,"sm":732,"fm":732,"tm":732,"am":732,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Presentar-Aguet","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1186},{"i":1524,"cid":"24AI0149","pid":"P00843199LZ","t":"Construction of Flood Mitigation Structure along Banilla River, Umingan - Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ANORE CONSTRUCTION","c":96351208.8,"abc":96500000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-09-07","lat":15.912914,"lon":120.726299,"sm":1613,"fm":1613,"tm":null,"am":1613,"md":0.0,"ls":"inside","ww":"Banilla","wn":"Banila River","wd":2.01,"wp":[15.91668,120.74464],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1187},{"i":1525,"cid":"22PA0092","pid":"P00632769LZ","t":"Construction of Malanas Flood Control, Malanas, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49497111.11,"abc":48999991.51,"fy":"2022","sd":"05/31/2022","cd":"2022-11-28","lat":17.67208,"lon":120.726494,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":722},{"i":1526,"cid":"22PF0050","pid":"P00639457LZ","t":"Construction of Ampusongan Flood Control, Phase II, Ampusongan, Bakun, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAKUN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"APAKLO KIN CONSTRUCTION AND ENG'G SERVICES","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"04/17/2022","cd":"2022-09-30","lat":16.7769,"lon":120.727455,"sm":114,"fm":114,"tm":114,"am":114,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1188},{"i":1527,"cid":"23CC0109","pid":"P00735987LZ","t":"Construction of Flood Mitigation Structures along Barangay San Nicolas, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199997.92,"abc":77199812.02,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.827845,"lon":120.727664,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1189},{"i":1528,"cid":"24CK0078","pid":"P00838444LZ","t":"Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package H, Sta. 5+569.50 to Sta. 5+969.90, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":96478501.75,"abc":96499524.36,"fy":"2024","sd":"03/16/2024","cd":"2024-09-15","lat":15.300425,"lon":120.729327,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.09,"wp":[15.2999,120.72869],"wst":"matched","br":null,"len":400.4,"ph":"Package H","dup":[],"run":[1544,1840],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0078 to 24CK0080) cover the same site, together worth PHP 289,434,417.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":250},{"i":1529,"cid":"23AA0113","pid":"P00726351LZ","t":"Construction of Flood Control Structure along Principal River (Bislak River), US Esperanza ES, Barangay Esperanza, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":48216067.0,"abc":48999836.4,"fy":"2023","sd":"03/13/2023","cd":"2023-10-10","lat":18.337064,"lon":120.728294,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Principal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Esperanza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1190},{"i":1530,"cid":"22AI0100","pid":"P00620974LZ","t":"Construction of Flood Control Structure along Lagasit River, Brgy. Baligayan, San Quintin, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"SAN QUINTIN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ROGENOX CONSTRUCTION AND SUPPLY CORP.","c":19584259.92,"abc":19600000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-15","lat":15.9544,"lon":120.72833,"sm":1350,"fm":1350,"tm":1350,"am":1393,"md":0.0,"ls":"inside","ww":"Lagasit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baligayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1191},{"i":1531,"cid":"24CK0026","pid":"P00824705LZ","t":"Construction of Earth Dike at Barangay Matayumtayum, La Paz, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.R.T. DWELL LIFESTYLE STORE AND ECO BUILDERS","c":45300247.26,"abc":46749376.93,"fy":"2024","sd":"03/23/2024","cd":"2024-06-25","lat":15.52681,"lon":120.72858,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matayumtayum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1192},{"i":1532,"cid":"23AA0145","pid":"P00725640LZ","t":"Construction of Flood Control Structure along Bislak River, Brgy. Esperanza, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":62724832.36,"abc":62724846.85,"fy":"2023","sd":"04/12/2023","cd":"2023-10-12","lat":18.333895,"lon":120.728948,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Esperanza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1193},{"i":1533,"cid":"21P00063","pid":"P00561461LZ","t":"Construction of Ampusongan Flood Control, Bakun, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Bakun","deo":"Benguet 2nd District Engineering Office","co":"TRYST BUILDERS ENTERPRISES / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":96500000.0,"abc":96487461.5,"fy":"2021","sd":"07/02/2021","cd":"2023-03-15","lat":16.78286,"lon":120.72942,"sm":114,"fm":null,"tm":114,"am":114,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1194},{"i":1534,"cid":"23CC0271","pid":"P00726898LZ","t":"Construction of Revetment along Hagonoy River at Barangay Santo Rosario, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":67549976.37,"abc":67549507.61,"fy":"2023","sd":"03/14/2023","cd":"2023-07-03","lat":14.816534,"lon":120.729467,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":0.03,"wp":[14.81672,120.72966],"wst":"matched","br":"Santo Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1195},{"i":1535,"cid":"23CE0121","pid":"P00742336LZ","t":"Construction of Flood Control Structures along Rio Chico River, Brgy. Partida II, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MJ O. BETIS BUILDERS","c":14845001.02,"abc":14850000.0,"fy":"2023","sd":"06/06/2023","cd":"2023-12-02","lat":15.650222,"lon":120.729558,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.03,"wp":[15.65048,120.72947],"wst":"matched","br":"Partida II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1196},{"i":1536,"cid":"24EB0099","pid":"P00824737LZ","t":"Construction of Flood Control Structure, Aluyan River, So. Aluyan, Barangay Tibag, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":19511207.94,"abc":19600000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-08-26","lat":13.455009,"lon":120.729607,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":"Aluyan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tibag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1197},{"i":1537,"cid":"24CC0189","pid":"P00844500LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Meyto (Purok 4 to Purok 5), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":77199237.53,"abc":77199806.32,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.893239,"lon":120.729944,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Meyto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1198},{"i":1538,"cid":"23CC0382","pid":"P00740585LZ","t":"Construction of Flood Mitigation Structure at barangay San Jose (Phase II), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":47022470.19,"abc":48999667.96,"fy":"2023","sd":"04/03/2023","cd":"2023-11-28","lat":14.892836,"lon":120.730032,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1199},{"i":1539,"cid":"23CC0186","pid":"P00740598LZ","t":"Construction of Flood Mitigation Structure, Brgy. San Jose, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":24499119.13,"abc":24499722.62,"fy":"2023","sd":"03/21/2023","cd":"2023-09-16","lat":14.891886,"lon":120.730037,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1200},{"i":1540,"cid":"22PA0131","pid":"P00639325LZ","t":"Construction of Malanas Flood Control Structure, Guimba and Daoidao, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) / UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.","c":96495674.0,"abc":96499918.09,"fy":"2022","sd":"05/26/2022","cd":"2022-08-23","lat":17.679863,"lon":120.730362,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1201},{"i":1541,"cid":"23A00326","pid":"P00726831LZ","t":"Construction of Riverbank and Slope Protection along Agno River, Brgy. San Rafael-San Felipe East, San Nicolas, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SAN NICOLAS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS) / ARCINUE COMM'L CORPORATION","c":67536444.52,"abc":67550000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-10-05","lat":16.060365,"lon":120.730518,"sm":1341,"fm":1341,"tm":1341,"am":1341,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.23,"wp":[16.05936,120.72859],"wst":"matched","br":"San Rafael-San Felipe East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1202},{"i":1542,"cid":"23CC0001","pid":"P00726155LZ","t":"Construction of Flood Control Structure along Barangay Meyto, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999319.76,"abc":48999837.9,"fy":"2023","sd":"02/06/2023","cd":"2023-04-26","lat":14.886872,"lon":120.730547,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Meyto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1203},{"i":1543,"cid":"23CC0230","pid":"P00727275LZ","t":"Construction of Revetment along Pampanga River at Barangay Meyto, Calumpit, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":72374980.21,"abc":72374881.78,"fy":"2023","sd":"03/14/2023","cd":"2023-07-03","lat":14.886847,"lon":120.730601,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.83,"wp":[14.89417,120.72903],"wst":"matched","br":"Meyto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1204},{"i":1544,"cid":"24CK0079","pid":"P00838445LZ","t":"Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package I, Sta. 5+169.10 to Sta. 569.50, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":96461259.27,"abc":96499653.63,"fy":"2024","sd":"03/16/2024","cd":"2024-09-15","lat":15.3,"lon":120.7309,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.2,"wp":[15.29857,120.7298],"wst":"matched","br":null,"len":null,"ph":"Package I","dup":[],"run":[1528,1840],"cl":[],"L":"records","s":58,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0078 to 24CK0080) cover the same site, together worth PHP 289,434,417.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":110},{"i":1545,"cid":"22PA0129","pid":"P00637058LZ","t":"Construction of Pang-ot Flood Control, Lagayan","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGAYAN (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48998000.0,"abc":48999966.62,"fy":"2022","sd":"05/26/2022","cd":"2022-11-28","lat":17.743969,"lon":120.730956,"sm":734,"fm":734,"tm":734,"am":734,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1205},{"i":1546,"cid":"22CE0170","pid":"P00640523LZ","t":"Rehabilitation of River Bed Flood Control Structure along Brgy. Bambanaba, Cuyapo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CUYAPO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":19403996.4,"abc":19800000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-11-24","lat":15.73794,"lon":120.730964,"sm":468,"fm":468,"tm":468,"am":468,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bambanaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1206},{"i":1547,"cid":"24CC0455","pid":"P00845971LZ","t":"Construction/Improvement of Slope Protection Structures and Waterways, Barangay San Jose, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98998602.6,"abc":98999760.15,"fy":"2024","sd":"05/21/2024","cd":"2024-12-11","lat":14.88507,"lon":120.731,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1207},{"i":1548,"cid":"22CK0085","pid":"P00640534LZ","t":"Rehabilitation of existing Dike along Lucung River, (Culatingan Section, Left Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP.","c":48342638.69,"abc":48249708.61,"fy":"2022","sd":"03/24/2022","cd":"2022-10-16","lat":15.33248,"lon":120.73104,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1003,1303,1745],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22CK0085 to 22CK0088) cover the same site, together worth PHP 280,552,442.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":543},{"i":1549,"cid":"23CI0095","pid":"P00727146LZ","t":"Repair/Improvement of Reinforced Concrete Slope Protection along Quitangil Creek, Brgy. Turu, Magalang, Pampanga - Phase 1","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"3-SIDES BUILDERS & TRADING CORP.","c":29381453.57,"abc":29396715.71,"fy":"2023","sd":"06/16/2023","cd":"2023-10-13","lat":15.244633,"lon":120.731223,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.13,"wp":[15.24572,120.73086],"wst":"matched","br":"Turu","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1208},{"i":1550,"cid":"24CC0196","pid":"P00844504LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay San Jose (Sitio Nagdasig), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77146300.03,"abc":77199843.7,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.889012,"lon":120.731734,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1209},{"i":1551,"cid":"22CI0027","pid":"P00630943LZ","t":"Improvement of Slope Protection Structures along Quitanguil Creek (Downstream), Sta. 0 + 000 - Sta. 0 + 464, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"SPIDERONE CONSTRUCTION COMPANY LTD. / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":67535048.42,"abc":68594579.47,"fy":"2022","sd":"02/25/2022","cd":"2022-08-23","lat":15.246927,"lon":120.731918,"sm":840,"fm":840,"tm":null,"am":860,"md":11.49,"ls":"outside","ww":"Quitanguil","wn":"Quitangil River","wd":0.02,"wp":[15.24684,120.73203],"wst":"matched","br":null,"len":464.0,"ph":null,"dup":[1552],"run":[],"cl":[],"L":"records","s":61,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.49,"text":"The pin is 11.5 km outside Mabalacat City, Pampanga, the nearest municipality the record claims. It falls in Magalang, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 116,521,785.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":89},{"i":1552,"cid":"22CI0036","pid":"P00620546LZ","t":"Improvement of Slope Protection Structures along Quitanguil Creek (Downstream), Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":48986736.23,"abc":48994980.97,"fy":"2022","sd":"03/24/2022","cd":"2022-10-19","lat":15.246927,"lon":120.731918,"sm":840,"fm":840,"tm":null,"am":860,"md":11.49,"ls":"outside","ww":"Quitanguil","wn":"Quitangil River","wd":0.02,"wp":[15.24684,120.73203],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1551],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.49,"text":"The pin is 11.5 km outside Mabalacat City, Pampanga, the nearest municipality the record claims. It falls in Magalang, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 116,521,785.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":111},{"i":1553,"cid":"23CC0159","pid":"P00737367LZ","t":"Construction of Flood Mitigation Structure, Sagrada Familia, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":59399974.1,"abc":59399669.22,"fy":"2023","sd":"02/13/2023","cd":"2023-11-29","lat":14.81805,"lon":120.73193,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1210},{"i":1554,"cid":"23CC0381","pid":"P00740584LZ","t":"Construction of Flood Mitigation Structure at barangay Meyto (Phase II), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":48999930.61,"abc":48999759.07,"fy":"2023","sd":"04/03/2023","cd":"2023-08-31","lat":14.887579,"lon":120.731968,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Meyto","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1211},{"i":1555,"cid":"24CC0184","pid":"P00823361LZ","t":"Construction/mprovement of Flood Mitigation Structure at Tampok, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77199973.8,"abc":77199799.22,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.854502,"lon":120.732189,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1212},{"i":1556,"cid":"22AI0076","pid":"P00631096LZ","t":"Construction of Flood Control Structure along Banila River, Barangay La Paz -San Leon, Umingan, Pangasinan (Package 2)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":48960181.18,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-10","lat":15.9128,"lon":120.7325,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":1.37,"wp":[15.91668,120.74464],"wst":"matched","br":"La Paz -San Leon","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1213},{"i":1557,"cid":"22AB0119","pid":"P00640491LZ","t":"Construction of Flood Control System, Brgy. Santiago, Solsona, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SOLSONA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"VCD CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-09-08","lat":18.09798,"lon":120.73257,"sm":1478,"fm":1478,"tm":1478,"am":1478,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santiago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1214},{"i":1558,"cid":"22PA0185","pid":"P00639439LZ","t":"Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / RM30 PSG CONSTRUCTION CORPORATION","c":28998220.94,"abc":29399917.48,"fy":"2022","sd":"01/11/2023","cd":"2023-07-02","lat":17.576152,"lon":120.73266,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banbancag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1215},{"i":1559,"cid":"24CC0271","pid":"P00844742LZ","t":"Construction of Revetment at Barangay Tampok, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SAMJS CONSTRUCTION SERVICES","c":29399600.57,"abc":29399980.74,"fy":"2024","sd":"04/02/2024","cd":"2024-08-29","lat":14.853168,"lon":120.733002,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tampok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1216},{"i":1560,"cid":"22PF0092","pid":"P00639454LZ","t":"Construction (Completion) of Gabion type Riprap at KM 288 Betak, Brgy. Road Section Aduyonan Phase 2, Abiang, Atok, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ATOK (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"QPJ GENERAL ENGINEERING CONSTRUCTION AND SUPPLY","c":2934995.04,"abc":2940000.0,"fy":"2022","sd":"06/20/2022","cd":"2022-10-16","lat":16.577193,"lon":120.733305,"sm":82,"fm":82,"tm":82,"am":82,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Road Section Aduyonan Phase 2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1217},{"i":1561,"cid":"23AA0118","pid":"P00726352LZ","t":"Construction of Flood Mitigating Facilities and Structure along Bacarra-Vintar River, US Tamdagan Bridge Left Bank, Barangay Tamdagan, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":81815539.49,"abc":83087290.78,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.320634,"lon":120.734013,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bacarra-Vintar","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tamdagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1218},{"i":1562,"cid":"24CC0178","pid":"P00823365LZ","t":"Construction/improvement of Flood Mitigation Structure at Panducot, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":77182692.83,"abc":77199924.6,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.882149,"lon":120.73421,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1219},{"i":1563,"cid":"24CC0016","pid":"P00838404LZ","t":"Construction of Riverbank Protection Structure at Barangay Meysulao, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77198007.55,"abc":77199993.39,"fy":"2024","sd":"02/07/2024","cd":"2024-10-03","lat":14.902058,"lon":120.734617,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Meysulao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1220},{"i":1564,"cid":"22EB0053","pid":"P00632930LZ","t":"Construction of Flood Control Structure along Pagbahan River, Barangay Alacaak, Sta. Cruz, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":22559787.41,"abc":29700000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-10-10","lat":13.163071,"lon":120.734747,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":"Pagbahan","wn":"Pagbahan","wd":0.15,"wp":[13.16441,120.73488],"wst":"matched","br":"Alacaak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1221},{"i":1565,"cid":"24CK0029","pid":"P00824710LZ","t":"Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package J, Sta.4+764.08 to Sta.5+169.10, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":46745172.42,"abc":46750481.51,"fy":"2024","sd":"05/07/2024","cd":"2024-09-30","lat":15.295639,"lon":120.735006,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.13,"wp":[15.29491,120.73406],"wst":"matched","br":null,"len":405.0,"ph":"Package J","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1222},{"i":1566,"cid":"22PE0012","pid":"P00620995LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 3 (Balococ River) and Section 4 (Salud River), Dalupirip, Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CLIFF CONSTRUCTION & AGGREGATES","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"05/10/2022","cd":"2022-11-12","lat":16.300139,"lon":120.735369,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.13,"wp":[16.30061,120.73646],"wst":"matched","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1223},{"i":1567,"cid":"23CK0041","pid":"P00725737LZ","t":"Rehabilitation of Existing Dike along Lucung River (Old Lucung Lilibangan & Magao Section), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":50142663.46,"abc":50179372.68,"fy":"2023","sd":"02/07/2023","cd":"2023-06-26","lat":15.33026,"lon":120.7361,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1467,1031,1849],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0040 to 23CK0043) cover the same site, together worth PHP 193,395,349.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":475},{"i":1568,"cid":"22AI0060","pid":"P00631095LZ","t":"Construction of Flood Control Structure along Banila River, Barangay La Paz -San Leon, Umingan, Pangasinan (Package 1)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":48958847.19,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-10","lat":15.91778,"lon":120.7369,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.84,"wp":[15.91668,120.74464],"wst":"matched","br":"La Paz -San Leon","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1224},{"i":1569,"cid":"23CC0176","pid":"P00740595LZ","t":"Construction of Flood Control Structures and Improvement of Waterways along Barangay Panducot, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":48995370.37,"abc":48999618.05,"fy":"2023","sd":"03/21/2023","cd":"2023-11-15","lat":14.879684,"lon":120.737145,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panducot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1225},{"i":1570,"cid":"22CK0096","pid":"P00639370LZ","t":"Rehabilitation of Dike along Parua River (Brgy. Castillo Section, Sta. 21+225 to Sta. 21+669 - Left Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":94527725.51,"abc":96499884.74,"fy":"2022","sd":"03/26/2022","cd":"2023-03-15","lat":15.29156,"lon":120.73749,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Parua","wn":"Parua River","wd":0.03,"wp":[15.29137,120.73725],"wst":"matched","br":"Castillo Section","len":444.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1226},{"i":1571,"cid":"24CC0195","pid":"P00844509LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Santa Monica (Purok 6 to Purok 7), Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":67549830.35,"abc":67549816.1,"fy":"2024","sd":"04/18/2024","cd":"2024-06-11","lat":14.838359,"lon":120.737587,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1227},{"i":1572,"cid":"22CK0110","pid":"P00621541LZ","t":"Rehabilitation of Existing Dike along Bulalo River, Bantog Section, Downside (D/S) of Check Gate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":19191837.84,"abc":19599422.68,"fy":"2022","sd":"06/29/2022","cd":"2023-04-12","lat":15.382778,"lon":120.737778,"sm":721,"fm":721,"tm":null,"am":721,"md":0.0,"ls":"inside","ww":"Bulalo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1228},{"i":1573,"cid":"24CC0019","pid":"P00838411LZ","t":"Construction of Riverbank Protection Structure at Barangay San Miguel, Hagonoy, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":77194570.6,"abc":77199979.68,"fy":"2024","sd":"02/07/2024","cd":"2024-12-02","lat":14.859313,"lon":120.737995,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1229},{"i":1574,"cid":"22CK0083","pid":"P00640533LZ","t":"Rehabilitation of Existing Dike along Binabakod River, Paludpud Section, D/S of Check Gate, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"N.C. AGUILAR CONST. & SUPPLY INC. / GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":34642609.17,"abc":34299837.35,"fy":"2022","sd":"03/24/2022","cd":"2022-12-28","lat":15.4049,"lon":120.738,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Binabakod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00999,"text":"Contract cost is 1.00% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":871},{"i":1575,"cid":"22CK0108","pid":"P00621538LZ","t":"Rehabilitation of Existing Dike along Bulalo River (Bantog Section, Left and Right Bank), D/S of Check Gate, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"TARLAC 3-G CONSTRUCTION & DEVELOPMENT CORPORATION","c":48997737.39,"abc":48999441.46,"fy":"2022","sd":"03/24/2022","cd":"2023-01-03","lat":15.379,"lon":120.738,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Bulalo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1230},{"i":1576,"cid":"24AI0215","pid":"P00848606LZ","t":"Construction of Slope Protection along Sabangan River, Brgy. Salpad-San Felipe, San Nicolas, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"SAN NICOLAS (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":98767177.79,"abc":99000000.0,"fy":"2024","sd":"05/14/2024","cd":"2024-11-15","lat":16.106093,"lon":120.738546,"sm":1341,"fm":1341,"tm":1341,"am":1341,"md":0.0,"ls":"inside","ww":"Sabangan","wn":"Sabangan River","wd":0.48,"wp":[16.10215,120.74051],"wst":"matched","br":"Salpad-San Felipe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1231},{"i":1577,"cid":"23CC0002","pid":"P00726156LZ","t":"Construction of Flood Control Structure along Barangay Panducot, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999996.14,"abc":48999773.77,"fy":"2023","sd":"02/06/2023","cd":"2023-05-04","lat":14.874314,"lon":120.738916,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panducot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1232},{"i":1578,"cid":"22AI0123","pid":"P00621446LZ","t":"Construction of Slope Protection Works in Barangay San Leon Balungao - San Leon Umingan, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":19579834.04,"abc":19600000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-13","lat":15.9172,"lon":120.7392,"sm":140,"fm":140,"tm":null,"am":1613,"md":1.84,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Leon Balungao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1233},{"i":1579,"cid":"23CC0009","pid":"P00726160LZ","t":"Construction of Flood Control Structure along Barangay Santa Monica, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"E.M. CUERPO, INC.","c":48999614.38,"abc":48999866.04,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.839765,"lon":120.739226,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1234},{"i":1580,"cid":"23CC0111","pid":"P00735991LZ","t":"Construction of Flood Mitigation Structures along Barangay Sta. Monica, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77140881.95,"abc":77199801.52,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.839756,"lon":120.739236,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1235},{"i":1581,"cid":"23CC0102","pid":"P00735985LZ","t":"Construction of Flood Mitigation Structures along Barangay San Agustin, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199989.04,"abc":77199734.91,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.840054,"lon":120.739328,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1236},{"i":1582,"cid":"22PA0141","pid":"P00639324LZ","t":"Construction of Malanas Flood Control Structure, Culliong, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":96496036.0,"abc":96499925.87,"fy":"2022","sd":"06/20/2022","cd":"2022-08-23","lat":17.686231,"lon":120.739338,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1237},{"i":1583,"cid":"23AA0128","pid":"P00725639LZ","t":"Construction of Flood Control Structure along Bislak River, Brgy. Lipay-Saricao, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":62724598.75,"abc":62724602.58,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.355262,"lon":120.739469,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lipay-Saricao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1238},{"i":1584,"cid":"23CC0192","pid":"P00740377LZ","t":"Construction of Flood Control Facility, Brgy. Sagrada Familia, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":144749489.9,"abc":144749717.3,"fy":"2023","sd":"03/28/2023","cd":"2023-10-24","lat":14.817383,"lon":120.739524,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sagrada Familia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1239},{"i":1585,"cid":"23CC0105","pid":"P00735984LZ","t":"Construction of Flood Mitigation Structures along Barangay Sta. Lucia, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199980.44,"abc":77199881.36,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.903749,"lon":120.739574,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1240},{"i":1586,"cid":"24CC0191","pid":"P00844506LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay San Miguel (Purok 7 to Purok 8), Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77192596.4,"abc":77199783.85,"fy":"2024","sd":"03/11/2024","cd":"2025-01-03","lat":14.858862,"lon":120.739602,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1241},{"i":1587,"cid":"23CC0108","pid":"P00735989LZ","t":"Construction of Flood Mitigation Structures along Barangay San Miguel, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199994.01,"abc":77199770.63,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.858741,"lon":120.739975,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1242},{"i":1588,"cid":"22AI0145","pid":"P00637765LZ","t":"Construction of Drainage Canal, Tayug, Pangasinan","w":"Construction of Drainage Structure","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"DMGR BUILDERS","c":4880078.07,"abc":4950000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-08-27","lat":16.0281,"lon":120.7406,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1243},{"i":1589,"cid":"23CC0103","pid":"P00735986LZ","t":"Construction of Flood Mitigation Structures along Barangay San Juan, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199987.19,"abc":77199730.36,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.865881,"lon":120.740974,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1244},{"i":1590,"cid":"22PA0151","pid":"P00639434LZ","t":"Construction of Barbarsik Flood Control Structure (Phase II), San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48997532.0,"abc":48249912.79,"fy":"2022","sd":"06/14/2022","cd":"2022-12-01","lat":17.684168,"lon":120.741193,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01549,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":671},{"i":1591,"cid":"23CC0238","pid":"P00726895LZ","t":"Construction of Revetment along Hagonoy River at Barangay Sagrada Familia, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":72372260.41,"abc":72372971.4,"fy":"2023","sd":"03/14/2023","cd":"2024-03-07","lat":14.817927,"lon":120.741292,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":1.19,"wp":[14.81573,120.73048],"wst":"matched","br":"Sagrada Familia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1245},{"i":1592,"cid":"23CK0065","pid":"P00727294LZ","t":"Rehabilitation of existing Dike along Rio Chico River (Macalong Section, Right Bank), Package 2, La Paz, Tarlac, Sta. 3+231 to Sta.3+711","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH STRENGTH DEV. CORPORATION","c":93594755.18,"abc":96499745.33,"fy":"2023","sd":"03/17/2023","cd":"2023-10-19","lat":15.47081,"lon":120.74133,"sm":721,"fm":721,"tm":432,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.47083,120.74154],"wst":"matched","br":null,"len":480.0,"ph":"Package 2","dup":[],"run":[1594,1593],"cl":[],"L":"records","s":55,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.11,"text":"The record contradicts itself: the municipality field and the pin point to La Paz, Tarlac, but the title names City of Tarlac, Tarlac, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CK0063 to 23CK0065) cover the same site, together worth PHP 286,583,954.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":142},{"i":1593,"cid":"23CK0064","pid":"P00727293LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Macalong Section, Right Bank), Package 1, La Paz, Tarlac, Sta. 2+755 to Sta.3+231","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"JAM-C BUILDERS / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96494805.62,"abc":96499656.21,"fy":"2023","sd":"03/17/2023","cd":"2023-10-19","lat":15.46659,"lon":120.7416,"sm":721,"fm":721,"tm":432,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.46659,120.74181],"wst":"matched","br":null,"len":476.0,"ph":"Package 1","dup":[],"run":[1594,1592],"cl":[],"L":"records","s":56,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.26,"text":"The record contradicts itself: the municipality field and the pin point to La Paz, Tarlac, but the title names City of Tarlac, Tarlac, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CK0063 to 23CK0065) cover the same site, together worth PHP 286,583,954.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":135},{"i":1594,"cid":"23CK0063","pid":"P00727292LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Lara Section, Right Bank), Package 1, La Paz, Tarlac (Sta. 0+819 to Sta. 1+313)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"NORTHERN BUILDERS","c":96494393.08,"abc":96499749.73,"fy":"2023","sd":"03/17/2023","cd":"2023-09-25","lat":15.449383,"lon":120.741667,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.19,"wp":[15.45099,120.74233],"wst":"matched","br":null,"len":494.0,"ph":"Package 1","dup":[],"run":[1593,1592],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CK0063 to 23CK0065) cover the same site, together worth PHP 286,583,954.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":251},{"i":1595,"cid":"23AA0103","pid":"P00725613LZ","t":"Construction of Flood Control Projects along Bislak River, Barangay Tamdagan, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899479.86,"abc":58799833.23,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.311523,"lon":120.741685,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tamdagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1246},{"i":1596,"cid":"24CC0194","pid":"P00844505LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay San Juan (Purok 4 to Purok 5), Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77195463.0,"abc":77199805.39,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.861453,"lon":120.741717,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1247},{"i":1597,"cid":"22DG0049","pid":"P00631292LZ","t":"Construction of Flood Control Structure at Barangay Labac, Naic, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NAIC (CAVITE)","deo":"Cavite 2nd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":18997097.04,"abc":19599872.23,"fy":"2022","sd":"02/14/2022","cd":"2023-10-05","lat":14.309699,"lon":120.741923,"sm":1009,"fm":1009,"tm":1009,"am":1009,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1248},{"i":1598,"cid":"23CK0050","pid":"P00727295LZ","t":"Construction of Existing Dike Along Rio Chico River (Bantog Section, Right Bank, Landslide), Package 3 La Paz, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497151.81,"abc":96499644.55,"fy":"2023","sd":"03/17/2023","cd":"2023-06-09","lat":15.38263,"lon":120.7426,"sm":721,"fm":721,"tm":432,"am":721,"md":0.0,"ls":"inside","ww":"Existing Dike Along Rio Chico","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.5,"text":"The record contradicts itself: the municipality field and the pin point to La Paz, Tarlac, but the title names City of Tarlac, Tarlac, 10 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":449},{"i":1599,"cid":"23CC0156","pid":"P00735982LZ","t":"Construction of Flood Mitigation Structures along Barangay Bulusan, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199991.76,"abc":77199771.87,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.912592,"lon":120.742858,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulusan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1249},{"i":1600,"cid":"24CJ0205","pid":"P00846016LZ","t":"Construction of Flood Control Structure (Bank Improvement) along Rio Chico River (Segment U), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":50000000.0,"abc":49500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-08-14","lat":15.600292,"lon":120.698672,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.6003,120.69873],"wst":"matched","br":null,"len":null,"ph":"Segment U","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":723},{"i":1601,"cid":"24CJ0018","pid":"P00821594LZ","t":"Construction of Flood Control Structure along Rio Chico River (Segment S), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":45000000.0,"abc":44100000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-06-21","lat":15.598597,"lon":120.698761,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.59861,120.69889],"wst":"matched","br":null,"len":null,"ph":"Segment S","dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":672},{"i":1602,"cid":"22AB0089","pid":"P00621596LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Caduyungan 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999996.73,"abc":48999996.73,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.95539,"lon":120.69918,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.92,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[],"cl":[1324,1327,1620,1637,1642,1649,1656],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1068},{"i":1603,"cid":"24CJ0004","pid":"P00821242LZ","t":"Construction of Flood Control Structure along Rio Chico River (Section C), Victoria, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"VICTORIA (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":92954070.0,"abc":90606745.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-05","lat":15.587483,"lon":120.6992,"sm":1626,"fm":1626,"tm":1626,"am":1626,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.58758,120.69935],"wst":"matched","br":null,"len":null,"ph":"Section C","dup":[],"run":[],"cl":[],"L":"field","s":35,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":502},{"i":1604,"cid":"22EB0038","pid":"P00621111LZ","t":"Construction of Flood Control Structure, Pagbahan River, Sta. 0+000 - Sta. 0+452, Talabaan Proper Section, Mamburao, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"MAMBURAO (CAPITAL) (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":29761702.43,"abc":44100000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-07","lat":13.139255,"lon":120.69944,"sm":908,"fm":908,"tm":908,"am":908,"md":0.0,"ls":"inside","ww":"Pagbahan","wn":"Pagbahan","wd":0.08,"wp":[13.13857,120.6998],"wst":"matched","br":null,"len":452.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1250},{"i":1605,"cid":"24CI0002","pid":"P00821592LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil River, Barangay San Agustin, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ALPIZ CONSTRUCTION & DEVELOPMENT CORPORATION","c":48967467.66,"abc":48983067.58,"fy":"2024","sd":"02/08/2024","cd":"2024-05-20","lat":15.24129,"lon":120.6999,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.33,"wp":[15.24425,120.69967],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1251},{"i":1606,"cid":"24CE0219","pid":"P00823433LZ","t":"Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Macamias, Guimba, Nueva Ecija (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":28660430.44,"abc":28950000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-09-20","lat":15.6198,"lon":120.699955,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.11,"wp":[15.62053,120.69922],"wst":"matched","br":"Macamias","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1252},{"i":1607,"cid":"24CG0013","pid":"P00820253LZ","t":"Construction of Slope Protection at Barangay Dawe and Bulac, Minalin, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MINALIN (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":73108547.48,"abc":77200000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-12-13","lat":14.9451,"lon":120.700185,"sm":978,"fm":978,"tm":978,"am":848,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dawe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1253},{"i":1608,"cid":"21PA0224","pid":"P00561513LZ","t":"Construction of San Juan Sur Flood Control, Barangay San Juan Sur, Manabo, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Manabo","deo":"Abra District Engineering Office","co":"PHESCO, INCORPORATED","c":48998000.0,"abc":48999958.81,"fy":"2021","sd":"01/07/2022","cd":"2022-07-21","lat":17.42287,"lon":120.70027,"sm":910,"fm":null,"tm":910,"am":910,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1254},{"i":1609,"cid":"24CG0203","pid":"P00844761LZ","t":"Construction of Dike, Brgy. Bebe Anac, Masantol to Brgy. San Esteban, Macabebe, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"MACABEBE (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"N-22 CONSTRUCTION AND TRADING","c":9270792.62,"abc":9800000.0,"fy":"2024","sd":"07/31/2024","cd":"2024-12-10","lat":14.87603,"lon":120.700275,"sm":848,"fm":848,"tm":848,"am":945,"md":1.29,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bebe Anac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1255},{"i":1610,"cid":"24AD0090","pid":"P00838505LZ","t":"Construction of River Wall, Baracbac-Sinagaban, Patungcaleo, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"NABANEW CONSTRUCTION AND SUPPLY","c":5688635.44,"abc":5880000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-10-08","lat":17.11617,"lon":120.70036,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1256},{"i":1611,"cid":"22EB0032","pid":"P00621105LZ","t":"Construction of Flood Control Structure Pagbahan River, Sta. Cruz Section, Sta. 0+000 - Sta. 0+452, Sta. Cruz, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":30638155.99,"abc":44100000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-10-12","lat":13.137982,"lon":120.700655,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":"Pagbahan","wn":"Pagbahan","wd":0.1,"wp":[13.13879,120.70023],"wst":"matched","br":null,"len":452.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1257},{"i":1612,"cid":"21PA0225","pid":"P00561512LZ","t":"Construction of San Juan Flood Control, Manabo, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Manabo","deo":"Abra District Engineering Office","co":"PHESCO, INCORPORATED","c":96498000.0,"abc":97999911.98,"fy":"2021","sd":"12/28/2021","cd":"2022-10-01","lat":17.42347,"lon":120.70073,"sm":910,"fm":null,"tm":910,"am":910,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1258},{"i":1613,"cid":"23A00261","pid":"P00727059LZ","t":"Rehabilitation of Flood Control Structure along Bongo River, Brgy. Madamba, Albano and Guerrero, Dingras, Ilocos Norte","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"DINGRAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":38599865.84,"abc":38600000.0,"fy":"2023","sd":"06/30/2023","cd":"2024-03-10","lat":18.107348,"lon":120.700785,"sm":517,"fm":517,"tm":517,"am":517,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Madamba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1259},{"i":1614,"cid":"24CK0070","pid":"P00838436LZ","t":"Rehabilitation of Existing Dike along Lucung River (Café Section, Right Bank), Phase 2, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.R.T. DWELL LIFESTYLE STORE AND ECO BUILDERS / T2B3 BUILDERS AND SUPPLIES CORP.","c":96494883.37,"abc":96499501.88,"fy":"2024","sd":"02/20/2024","cd":"2024-10-23","lat":15.330414,"lon":120.700967,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[1043,1046,1310,1872,1012],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":252},{"i":1615,"cid":"22AB0102","pid":"P00637048LZ","t":"Construction of Flood Control Structure along Bongo River, Brgy. Parado, Dingras, Ilocos Norte (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"DINGRAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-11-07","lat":18.06952,"lon":120.70135,"sm":517,"fm":517,"tm":517,"am":517,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Parado","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1260},{"i":1616,"cid":"22AA0151","pid":"P00637763LZ","t":"Construction of Flood Mitigation Structure along Vintar River (Bislak River), Brgy. Alsem, Sitio Namnama, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":43559717.83,"abc":43559791.2,"fy":"2022","sd":"03/24/2022","cd":"2022-10-04","lat":18.281021,"lon":120.701691,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Vintar","wn":"Vintar River","wd":5.74,"wp":[18.32888,120.72266],"wst":"matched","br":"Alsem","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.74,"text":"The title names Vintar, which OpenStreetMap maps through the stated municipality, but the pin is 5.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":351},{"i":1617,"cid":"21CK0034","pid":"P00561539LZ","t":"Rehabilitation of Existing Dike along Tinang River, (Left and Right Bank), Upstream of Sta. Monica Bridge, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"Concepcion","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":67548125.86,"abc":67549246.12,"fy":"2021","sd":"03/24/2022","cd":"2023-04-22","lat":15.36632,"lon":120.70287,"sm":448,"fm":null,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Tinang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1261},{"i":1618,"cid":"22AA0131","pid":"P00621443LZ","t":"Construction of Flood Control Structures along Bislak River, Brgy. Alsem, 0+000-0+798, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48998688.75,"abc":48999390.16,"fy":"2022","sd":"03/24/2022","cd":"2022-10-10","lat":18.28285,"lon":120.70287,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alsem","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1262},{"i":1619,"cid":"22AB0090","pid":"P00621597LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Nalibegan 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.95367,"lon":120.70306,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.52,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1263},{"i":1620,"cid":"22AB0093","pid":"P00621600LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Caduyungan 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-12-07","lat":17.95405,"lon":120.7032,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.54,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[1649,1324,1637,1327],"cl":[1324,1327,1602,1637,1642,1649,1656],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22AB0092 to 22AB0097) cover the same site, together worth PHP 244,999,987.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":123},{"i":1621,"cid":"23PA0253","pid":"P00726387LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"MANABO (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144750000.0,"abc":141940493.4,"fy":"2023","sd":"11/23/2023","cd":"2024-09-12","lat":17.444282,"lon":120.703436,"sm":910,"fm":910,"tm":910,"am":910,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":36,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.01979,"text":"Contract cost is 1.98% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":476},{"i":1622,"cid":"23CI0052","pid":"P00740599LZ","t":"Improvement/Rehabilitation/Construction of Drainage Magalang, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"CMDV CONSTRUCTION","c":19583561.5,"abc":19585058.35,"fy":"2023","sd":"06/26/2023","cd":"2023-09-23","lat":15.254879,"lon":120.703703,"sm":860,"fm":860,"tm":null,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1264},{"i":1623,"cid":"24PA0114","pid":"P00824667LZ","t":"Construction of Malabbaga Flood Control Structure, Malabbaga, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":48997499.86,"abc":48250000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-09-18","lat":17.69621,"lon":120.70421,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01549,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":673},{"i":1624,"cid":"24CI0075","pid":"P00823457LZ","t":"Construction of Flood Control Structure in Magalang, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"WNR CONSTRUCTION AND TRADING","c":43422127.93,"abc":43863032.91,"fy":"2024","sd":"04/04/2024","cd":"2024-09-25","lat":15.244042,"lon":120.704265,"sm":860,"fm":860,"tm":null,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1265},{"i":1625,"cid":"22AA0129","pid":"P00621441LZ","t":"Construction of Flood Control Structures along Bislak River, Brgy. Alsem Sitio Rang-Ay, 0+000-0+824, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48999368.12,"abc":48999463.29,"fy":"2022","sd":"03/24/2022","cd":"2022-10-10","lat":18.284372,"lon":120.704449,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alsem Sitio Rang-Ay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1266},{"i":1626,"cid":"23C00048","pid":"P00725699LZ","t":"Construction of Flood Control Structures, Abacan River, Diking and Slope Protection Works (Phase I), Mexico, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MEXICO (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"A.D. GONZALES JR. CONSTRUCTION & TRADING CO. INC.","c":96496469.38,"abc":96499804.52,"fy":"2023","sd":"02/27/2023","cd":"2023-11-23","lat":15.11971,"lon":120.7049,"sm":970,"fm":970,"tm":970,"am":970,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.21,"wp":[15.11787,120.7053],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1267},{"i":1627,"cid":"21PA0233","pid":"P00561519LZ","t":"Construction of Malabbaga Flood Control, Sta. 58+300 - 58+800, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"La Paz","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":29397900.0,"abc":29399855.69,"fy":"2021","sd":"03/29/2022","cd":"2022-11-16","lat":17.67893,"lon":120.70491,"sm":723,"fm":null,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1268},{"i":1628,"cid":"23PA0134","pid":"P00727256LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Podayan, Patoc, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGANGILANG (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96500000.0,"abc":96499917.08,"fy":"2023","sd":"08/29/2023","cd":"2024-04-16","lat":17.455254,"lon":120.705064,"sm":235,"fm":732,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":13.8,"text":"The record contradicts itself: the title and the pin point to Bucay, Abra, but the municipality field names Lagangilang, Abra, 14 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":425},{"i":1629,"cid":"23PA0136","pid":"P00727252LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Paga, Cardona, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGANGILANG (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96497500.0,"abc":96499963.91,"fy":"2023","sd":"06/14/2023","cd":"2024-01-10","lat":17.676182,"lon":120.705111,"sm":525,"fm":732,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":5.52,"text":"The record contradicts itself: the title and the pin point to Dolores, Abra, but the municipality field names Lagangilang, Abra, 6 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":450},{"i":1630,"cid":"22PA0193","pid":"P00639318LZ","t":"Construction of Flood Control Structure, Barangay Cardona, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96499903.75,"fy":"2022","sd":"07/20/2022","cd":"2023-04-21","lat":17.675047,"lon":120.70529,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cardona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1269},{"i":1631,"cid":"22AA0127","pid":"P00621439LZ","t":"Construction of Flood Control Structures along Bislak River, Brgy. Alsem Sitio Sadiri, 0+000-0+788, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48999395.18,"abc":48999440.19,"fy":"2022","sd":"03/24/2022","cd":"2022-10-10","lat":18.286362,"lon":120.705319,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alsem Sitio Sadiri","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1270},{"i":1632,"cid":"23CK0056","pid":"P00740328LZ","t":"Construction/Rehabilitation of Existing Earth Dike at Telakawa Creek, Dalan Danum Creek, Brgy. San Isidro, Sitio Almendras, Concepcion, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / LAP GLOBAL CONSTRUCTION CORPORATION(FORMERLY LAP GLOBAL CONSTRUCTION)","c":96476890.4,"abc":96499240.76,"fy":"2023","sd":"04/04/2023","cd":"2023-10-24","lat":15.272,"lon":120.7054,"sm":448,"fm":448,"tm":448,"am":860,"md":0.02,"ls":"boundary","ww":"Telakawa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1271},{"i":1633,"cid":"24CK0054","pid":"P00824711LZ","t":"Rehabilitation of Existing Dike along Lucung River (Cafe Section, Right Bank), Phase 3, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"R.R. RICAFORT CONSTRUCTION AND SUPPLIES","c":29397276.44,"abc":29399493.93,"fy":"2024","sd":"02/05/2024","cd":"2024-05-16","lat":15.33145,"lon":120.705544,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1272},{"i":1634,"cid":"22AI0077","pid":"P00631099LZ","t":"Construction of River Wall at Barangay Rajal, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES / RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":48954297.03,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-02-25","lat":15.9028,"lon":120.70556,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rajal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1273},{"i":1635,"cid":"22PA0363","pid":"P00639323LZ","t":"Construction of Flood Control Structure, Malabbaga, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":91407703.92,"abc":91406704.68,"fy":"2022","sd":"02/15/2023","cd":"2023-11-17","lat":17.688349,"lon":120.705578,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1274},{"i":1636,"cid":"22PA0362","pid":"P00637011LZ","t":"Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":95556743.85,"abc":95928688.12,"fy":"2022","sd":"02/21/2023","cd":"2023-11-25","lat":17.670512,"lon":120.705733,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cardona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1275},{"i":1637,"cid":"22AB0096","pid":"P00621608LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River (Right Bank), Barangay Cabittauran, Sitio Cabadocan, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999996.73,"abc":48999996.73,"fy":"2022","sd":"03/25/2022","cd":"2022-12-07","lat":17.9307,"lon":120.7058,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[1649,1620,1324,1327],"cl":[1324,1327,1602,1620,1642,1649,1656],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22AB0092 to 22AB0097) cover the same site, together worth PHP 244,999,987.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":124},{"i":1638,"cid":"22PA0364","pid":"P00621275LZ","t":"Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":91539920.25,"abc":91539341.71,"fy":"2022","sd":"02/15/2023","cd":"2023-07-14","lat":17.690574,"lon":120.70582,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1000.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1276},{"i":1639,"cid":"22PA0030","pid":"P00630931LZ","t":"Construction of Patoc Flood Control Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"PHESCO, INCORPORATED","c":96498000.0,"abc":96499807.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-10","lat":17.451628,"lon":120.7059,"sm":235,"fm":235,"tm":null,"am":910,"md":0.19,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1277},{"i":1640,"cid":"22PA0344","pid":"P00637012LZ","t":"Construction of Sidongan Flood Control Structure, Barangay Luis, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96497500.0,"abc":96499940.76,"fy":"2022","sd":"12/01/2022","cd":"2023-07-11","lat":17.695383,"lon":120.706022,"sm":723,"fm":723,"tm":723,"am":1314,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1278},{"i":1641,"cid":"23AI0091","pid":"P00742281LZ","t":"Construction of Flood Control Structure Located at Barangay San Joaquin, Balungao, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"JHI CONSTRUCTION & SUPPLY","c":14509105.66,"abc":14700000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-04-27","lat":15.9408,"lon":120.706363,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":27,"text":"A PHP 14,509,106 contract recorded as completed 27 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":724},{"i":1642,"cid":"22AB0088","pid":"P00621595LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Baetan 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-27","lat":17.95126,"lon":120.7064,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.08,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[],"cl":[1324,1327,1602,1620,1637,1649,1656],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1069},{"i":1643,"cid":"25DB0048","pid":"P00941618LZ","t":"Construction of Flood Mitigation Structure in Barangay Malibu, Tuy, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TUY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":4753000.0,"abc":4900000.0,"fy":"2025","sd":"03/03/2025","cd":"2025-05-19","lat":13.996941,"lon":120.706502,"sm":1611,"fm":1611,"tm":1611,"am":1611,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malibu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1279},{"i":1644,"cid":"22AB0094","pid":"P00621601LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Sto. Niño, Sitio Nalibegan 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.9517,"lon":120.70656,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.11,"ls":"boundary","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1280},{"i":1645,"cid":"22A00231","pid":"P00639416LZ","t":"Construction of Waterway Structure along Baruyen River, Brgy. Baruyen, Bangui, Ilocos Norte (Phase I)","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":48249612.44,"abc":49000000.0,"fy":"2022","sd":"10/25/2022","cd":"2023-04-25","lat":18.516551,"lon":120.706607,"sm":151,"fm":1638,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Baruyen","wn":"Baruyen River","wd":0.01,"wp":[18.5165,120.70669],"wst":"matched","br":"Baruyen","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.4,"text":"The record contradicts itself: the title and the pin point to Bangui, Ilocos Norte, but the municipality field names Vintar, Ilocos Norte, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":535},{"i":1646,"cid":"23PA0125","pid":"P00726857LZ","t":"Construction of Baybayatin Flood Control, Lagayan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGAYAN (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96500000.0,"abc":96499996.55,"fy":"2023","sd":"05/17/2023","cd":"2024-01-03","lat":17.77086,"lon":120.707779,"sm":734,"fm":734,"tm":734,"am":734,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1281},{"i":1647,"cid":"22AB0091","pid":"P00621598LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Tengnga, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999997.76,"abc":48999997.76,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.94797,"lon":120.70819,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1282},{"i":1648,"cid":"24AD0086","pid":"P00838499LZ","t":"Construction of Inawey River Wall, Lamag, Quirino, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"EJIEV CONSTRUCTION SERVICES","c":5688855.8,"abc":5880000.0,"fy":"2024","sd":"05/07/2024","cd":"2024-10-08","lat":17.14171,"lon":120.70828,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":"Inawey","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1283},{"i":1649,"cid":"22AB0092","pid":"P00621599LZ","t":"Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Baetan 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":48999996.73,"abc":48999996.73,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":17.94843,"lon":120.70831,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[1620,1324,1637,1327],"cl":[1324,1327,1602,1620,1637,1642,1656],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22AB0092 to 22AB0097) cover the same site, together worth PHP 244,999,987.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":125},{"i":1650,"cid":"23CE0032","pid":"P00726732LZ","t":"Construction of Flood Control Structure along Rio Chico River, Barangay Macamias, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":48010181.1,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-07-27","lat":15.626937,"lon":120.708467,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.6268,120.70853],"wst":"matched","br":"Macamias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1284},{"i":1651,"cid":"22PA0212","pid":"P00639436LZ","t":"Construction of Flood Control Structure along Poblacion, Sta. 11 + 100 - Sta. 11 + 600, Lagayan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGAYAN (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48997999.8,"abc":48999942.25,"fy":"2022","sd":"07/25/2022","cd":"2023-01-27","lat":17.715521,"lon":120.708578,"sm":734,"fm":734,"tm":734,"am":734,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1285},{"i":1652,"cid":"23A00113","pid":"P00725595LZ","t":"Construction of Flood Control Structure along Bongo River Phase III Brgy. Medina, Dingras, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"DINGRAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"AJ TAYLAN CONSTRUCTION CORPORATION","c":48248180.2,"abc":48250000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-01-19","lat":18.08314,"lon":120.708769,"sm":517,"fm":517,"tm":517,"am":517,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Medina","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1286},{"i":1653,"cid":"23AA0125","pid":"P00735959LZ","t":"Construction of Flood Control Structure along Banban River (Left and Right Bank), Barangay Baruyen and Taguiporo, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION)","c":57899999.88,"abc":58799832.12,"fy":"2023","sd":"03/13/2023","cd":"2023-11-17","lat":18.518555,"lon":120.709181,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Banban","wn":"Banban River","wd":0.01,"wp":[18.51864,120.70926],"wst":"matched","br":"Baruyen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1287},{"i":1654,"cid":"22PA0046","pid":"P00632757LZ","t":"Construction of Bayaan Flood Control, Barangay Bayaan, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497200.0,"abc":48999939.93,"fy":"2022","sd":"02/17/2022","cd":"2022-11-05","lat":17.65448,"lon":120.709312,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":725},{"i":1655,"cid":"23PA0116","pid":"P00726388LZ","t":"Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LUBA (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144750000.0,"abc":144749971.4,"fy":"2023","sd":"04/27/2023","cd":"2024-03-04","lat":17.35472,"lon":120.71,"sm":814,"fm":814,"tm":814,"am":814,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ampalioc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":377},{"i":1656,"cid":"23AB0142","pid":"P00725649LZ","t":"Construction of Flood Control Structure along Cabittauran River, Right Bank, Sitio Centro Daya, brgy. Cabittauran, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":18533050.52,"abc":18721000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-10-16","lat":17.94454,"lon":120.71018,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Cabittauran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabittauran","len":null,"ph":null,"dup":[],"run":[],"cl":[1324,1327,1602,1620,1637,1642,1649],"L":"field","s":16,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Cabittauran (2022 to 2023), totalling PHP 361,533,032.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1121},{"i":1657,"cid":"22AI0136","pid":"P00621445LZ","t":"Construction of Slope Protection Works along Banila River, Brgy. Mauban, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":24473376.44,"abc":24500000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-10-10","lat":15.9028,"lon":120.7106,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":3.96,"wp":[15.91668,120.74464],"wst":"matched","br":"Mauban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1288},{"i":1658,"cid":"22CI0064","pid":"P00640525LZ","t":"Construction of Slope Protection works with concrete foundation along Sapang Balen Creek, Barangay Balitucan, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"3-SIDES BUILDERS & TRADING CORP.","c":48978136.7,"abc":48994961.58,"fy":"2022","sd":"03/24/2022","cd":"2022-10-19","lat":15.255357,"lon":120.710667,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":9.84,"wp":[15.32065,120.64854],"wst":"matched","br":"Balitucan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1289},{"i":1659,"cid":"24AI0069","pid":"P00824661LZ","t":"Construction of Flood Control Structure along Banila River, Brgy. Mauban, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":24477326.91,"abc":24500000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-07-15","lat":15.902464,"lon":120.710919,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":3.94,"wp":[15.91668,120.74464],"wst":"matched","br":"Mauban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1290},{"i":1660,"cid":"22PF0024","pid":"P00620479LZ","t":"Construction of Pasdong Flood Control along Amburayan River, Pasdong, Atok, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ATOK (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"OLSIM CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-09-05","lat":16.633028,"lon":120.710933,"sm":82,"fm":82,"tm":82,"am":82,"md":0.0,"ls":"inside","ww":"Amburayan","wn":"Amburayan River","wd":4.13,"wp":[16.5995,120.69396],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.13,"text":"The title names Amburayan, which OpenStreetMap maps through the stated municipality, but the pin is 4.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":386},{"i":1661,"cid":"24CE0220","pid":"P00823431LZ","t":"Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Calem, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MIVICO BUILDERS & DEVELOPERS","c":52544201.3,"abc":53075000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-03","lat":15.630948,"lon":120.711167,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.63098,120.71104],"wst":"matched","br":"Calem","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1291},{"i":1662,"cid":"23CI0061","pid":"P00742144LZ","t":"Construction/Repair of Reinforced Concrete Slope Protection Structure along Quitanguil Creek Brgy. San Agustin to Brgy. Sto. Niño, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING / FRAMECON BUILDERS","c":69224573.34,"abc":69291530.47,"fy":"2023","sd":"06/05/2023","cd":"2023-11-25","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitanguil","wn":"Quitangil River","wd":0.02,"wp":[15.23929,120.71153],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[1663,1664,1665,1666,1667,1668],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":174},{"i":1663,"cid":"23CI0068","pid":"P00727144LZ","t":"Construction / Maintenance of Flood Mitigation Structures along Quitangil River, San Agustin, Magalang, Pampanga - Phase 1","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"3-SIDES BUILDERS & TRADING CORP.","c":44085596.84,"abc":44096687.9,"fy":"2023","sd":"04/25/2023","cd":"2023-09-21","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.02,"wp":[15.23929,120.71153],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[1662,1664,1665,1666,1667,1668],"run":[],"cl":[],"L":"field","s":38,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":392},{"i":1664,"cid":"23CI0109","pid":"P00742366LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Sto. Niño, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19762442.35,"abc":19788565.59,"fy":"2023","sd":"06/05/2023","cd":"2023-09-02","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.02,"wp":[15.23929,120.71153],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1662,1663,1665,1666,1667,1668],"run":[],"cl":[],"L":"field","s":35,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":503},{"i":1665,"cid":"23CI0116","pid":"P00742361LZ","t":"Construction of Reinforced Concrete Slope Protection with Structure along Quintangil Creek, Brgy. San Agustin, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":48379510.98,"abc":48493196.02,"fy":"2023","sd":"05/16/2023","cd":"2023-10-12","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quintangil","wn":"Quitangil River","wd":0.02,"wp":[15.23929,120.71153],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[1662,1663,1664,1666,1667,1668],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":320},{"i":1666,"cid":"23CI0122","pid":"P00742363LZ","t":"Construction of Slope Protection with Groundsill Along Quitangil Creek, Bgy Sto Niño, Magalang, Pampanga (Section Left And Right Side)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"J.H.R. ENTERPRISES","c":49493704.83,"abc":49499419.34,"fy":"2023","sd":"05/16/2023","cd":"2023-10-12","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Groundsill Along Quitangil","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto Niño","len":null,"ph":null,"dup":[1662,1663,1664,1665,1667,1668],"run":[],"cl":[],"L":"field","s":41,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":201},{"i":1667,"cid":"23CI0126","pid":"P00742360LZ","t":"Construction of Reinforced Concrete Slope Protection with Structure along Quintangil Creek, Brgy. Santo Niño, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":19751041.93,"abc":19791971.99,"fy":"2023","sd":"05/24/2023","cd":"2023-08-31","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quintangil","wn":"Quitangil River","wd":0.02,"wp":[15.23929,120.71153],"wst":"matched","br":"Santo Niño","len":null,"ph":null,"dup":[1662,1663,1664,1665,1666,1668],"run":[],"cl":[],"L":"field","s":35,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":504},{"i":1668,"cid":"23CI0149","pid":"P00740626LZ","t":"Construction of Slope Protection San Agustin, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":4850873.57,"abc":4998075.77,"fy":"2023","sd":"06/05/2023","cd":"2023-08-03","lat":15.239167,"lon":120.71134,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[1662,1663,1664,1665,1666,1667],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 255,547,744.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":640},{"i":1669,"cid":"23PA0103","pid":"P00726389LZ","t":"Construction of Flood Control Structure along Tineg River, Tagaytay, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":77194438.0,"abc":77199901.54,"fy":"2023","sd":"04/14/2023","cd":"2023-07-21","lat":17.69297,"lon":120.711787,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":"Tineg","wn":"TIneg River","wd":0.03,"wp":[17.69289,120.71155],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1292},{"i":1670,"cid":"22PA0031","pid":"P00620984LZ","t":"Construction of Flood Control Structure along Abra River, Sta. 0+000 - Sta. 0+500, Patoc, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":30176120.0,"abc":30178018.22,"fy":"2022","sd":"02/17/2022","cd":"2022-08-01","lat":17.453768,"lon":120.711855,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":1.17,"wp":[17.45175,120.70102],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1293},{"i":1671,"cid":"22PA0032","pid":"P00631101LZ","t":"Construction of Patoc Flood Control Structure (Phase III), Sta. 0+600 - Sta. 1+100, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"A.D. MARRERO GENERAL CONSTRUCTION","c":29398000.0,"abc":29399906.75,"fy":"2022","sd":"02/17/2022","cd":"2022-08-07","lat":17.453061,"lon":120.712051,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":500.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1294},{"i":1672,"cid":"22PA0053","pid":"P00632776LZ","t":"Construction of Pulot Flood Control Structure (Phase 2), Barangay Pulot, Lagayan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGAYAN (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / SEJ CONSTRUCTION & AGGREGATES","c":49498000.0,"abc":48999938.48,"fy":"2022","sd":"03/01/2022","cd":"2022-09-03","lat":17.725555,"lon":120.7125,"sm":734,"fm":734,"tm":734,"am":1314,"md":0.22,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulot","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01016,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":726},{"i":1673,"cid":"21PA0232","pid":"P00561504LZ","t":"Construction of Pantoc-Pakiling Flood Control, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Bucay","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497003.85,"abc":98000000.0,"fy":"2021","sd":"12/28/2021","cd":"2022-09-24","lat":17.516497,"lon":120.713608,"sm":235,"fm":null,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1295},{"i":1674,"cid":"21AA0098","pid":"P00525856LZ","t":"Construction/Improvement of River Control System (Phase II), Barangay Taguiporo, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Bangui","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":9799889.76,"abc":9799929.29,"fy":"2021","sd":"08/18/2021","cd":"2022-07-15","lat":18.517951,"lon":120.713808,"sm":151,"fm":null,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Taguiporo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1296},{"i":1675,"cid":"22PA0075","pid":"P00632767LZ","t":"Construction of Lusuac Flood Control Structure, Barangay Poblacion, Lagayan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGAYAN (ABRA)","deo":"Abra District Engineering Office","co":"SEJ CONSTRUCTION & AGGREGATES / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":48999918.77,"fy":"2022","sd":"03/10/2022","cd":"2022-09-12","lat":17.728691,"lon":120.71401,"sm":734,"fm":734,"tm":734,"am":1314,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1297},{"i":1676,"cid":"21PA0221","pid":"P00561509LZ","t":"Construction of Pulot - Kiwas Flood Control, Lagayan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Lagayan","deo":"Abra District Engineering Office","co":"SEJ CONSTRUCTION & AGGREGATES / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96498000.0,"abc":98000000.0,"fy":"2021","sd":"12/28/2021","cd":"2022-09-24","lat":17.73141,"lon":120.71412,"sm":734,"fm":null,"tm":734,"am":734,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1298},{"i":1677,"cid":"21PA0254","pid":"P00561502LZ","t":"Construction of Pagala Flood Control, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Bucay","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497238.95,"abc":97999827.95,"fy":"2021","sd":"12/28/2021","cd":"2022-09-24","lat":17.557932,"lon":120.714198,"sm":235,"fm":null,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1299},{"i":1678,"cid":"23C00049","pid":"P00725732LZ","t":"Flood Control Works-Abacan River Diking and Slope Protection Works, Mexico, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"A.D. GONZALES JR. CONSTRUCTION & TRADING CO. INC.","c":270194706.0,"abc":270199419.4,"fy":"2023","sd":"03/13/2023","cd":"2024-03-06","lat":15.116316,"lon":120.714401,"sm":970,"fm":71,"tm":970,"am":970,"md":0.0,"ls":"inside","ww":"Works-Abacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1300},{"i":1679,"cid":"23CC0190","pid":"P00740375LZ","t":"Construction of Revetment, Brgy. San Pascual, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":144749439.7,"abc":144749632.8,"fy":"2023","sd":"03/28/2023","cd":"2023-10-24","lat":14.811622,"lon":120.714506,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pascual","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1301},{"i":1680,"cid":"23CI0093","pid":"P00727143LZ","t":"Construction / Maintenance of Flood Mitigation Structures along Quitangil River, Magalang, Pampanga - Phase 1","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"GEOHEART CONSTRUCTION & TRADING / THREE-IN-ONE CONSTRUCTION & TRADING","c":46024057.5,"abc":46040632.7,"fy":"2023","sd":"04/25/2023","cd":"2023-09-21","lat":15.252593,"lon":120.715136,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":1.39,"wp":[15.24194,120.70832],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1302},{"i":1681,"cid":"23CE0006","pid":"P00726733LZ","t":"Construction of Flood Control Structure along Rio Chico River, Barangay Partida I, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MIVICO BUILDERS & DEVELOPERS","c":48994000.0,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-10","lat":15.641573,"lon":120.715186,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.6414,120.71524],"wst":"matched","br":"Partida I","len":null,"ph":null,"dup":[1682],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 115,861,803.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1097},{"i":1682,"cid":"24CE0196","pid":"P00823430LZ","t":"Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Partida I, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":66867803.43,"abc":67550000.0,"fy":"2024","sd":"04/29/2024","cd":"2025-01-24","lat":15.641573,"lon":120.715186,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.6414,120.71524],"wst":"matched","br":"Partida I","len":null,"ph":null,"dup":[1681],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 115,861,803.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1070},{"i":1683,"cid":"21PA0252","pid":"P00561506LZ","t":"Construction of Patoc-Dugong Flood Control, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Bucay","deo":"Abra District Engineering Office","co":"PHESCO, INCORPORATED","c":96497977.23,"abc":98000000.0,"fy":"2021","sd":"12/28/2021","cd":"2022-09-26","lat":17.454613,"lon":120.715788,"sm":235,"fm":null,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1303},{"i":1684,"cid":"22CK0069","pid":"P00631265LZ","t":"Rehabilitation of Existing Bank along Lucung River (Cafe Section, Right Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":47916435.66,"abc":48999706.34,"fy":"2022","sd":"01/29/2022","cd":"2022-09-06","lat":15.33303,"lon":120.71585,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1304},{"i":1685,"cid":"22PF0021","pid":"P00620476LZ","t":"Construction of Ampusongan Flood Control, Sitio Gayabasan, Ampusongan, Bakun Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAKUN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-10-13","lat":16.798382,"lon":120.716051,"sm":114,"fm":114,"tm":null,"am":114,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1305},{"i":1686,"cid":"22PA0294","pid":"P00637059LZ","t":"Construction of Flood Control/Drainage Canal along South-North - Labon-San Miguel-Bangcagan, Bucay, Abra","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"A.D. MARRERO GENERAL CONSTRUCTION","c":48997065.54,"abc":48999593.41,"fy":"2022","sd":"08/02/2022","cd":"2023-01-04","lat":17.530918,"lon":120.716349,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1306},{"i":1687,"cid":"22PA0104","pid":"P00632756LZ","t":"Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49498000.0,"abc":48999962.04,"fy":"2022","sd":"06/15/2022","cd":"2022-12-18","lat":17.561285,"lon":120.71708,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangcagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01016,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":727},{"i":1688,"cid":"22PA0224","pid":"P00637062LZ","t":"Construction of Bancagan-Pagala Flood Control, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48998000.0,"abc":48999954.11,"fy":"2022","sd":"07/20/2022","cd":"2023-01-22","lat":17.553518,"lon":120.71733,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1307},{"i":1689,"cid":"23E00151","pid":"P00740424LZ","t":"Construction of Shore Protection and Coastal Road Development along Barangay Mulawin, Sta. Cruz, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":241247329.3,"abc":241249999.5,"fy":"2023","sd":"04/13/2023","cd":"2024-02-10","lat":13.0788,"lon":120.7174,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mulawin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1308},{"i":1690,"cid":"23DB0018","pid":"P00725838LZ","t":"Construction of Riverbank Protection along Binambang River, Sta. 0 + 536 - Sta. 1 + 072.00 (Upstream L/S) at Balayan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":77198760.0,"abc":77198760.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-16","lat":13.94116,"lon":120.71782,"sm":124,"fm":124,"tm":180,"am":124,"md":0.0,"ls":"inside","ww":"Binambang","wn":"Binambang River","wd":0.01,"wp":[13.94122,120.71792],"wst":"matched","br":null,"len":536.0,"ph":null,"dup":[],"run":[1696,1512],"cl":[],"L":"records","s":53,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":38.31,"text":"The record contradicts itself: the municipality field and the pin point to Balayan, Batangas, but the title names Batangas City, Batangas, 38 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DB0016 to 23DB0018) cover the same site, together worth PHP 250,465,266.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":156},{"i":1691,"cid":"24DB0108","pid":"P00846031LZ","t":"Construction of Drainage System, Government Center Site, Barangay Caloocan, Balayan, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":19800000.0,"abc":19800000.0,"fy":"2024","sd":"09/02/2024","cd":"2024-11-10","lat":13.9453,"lon":120.7187,"sm":124,"fm":124,"tm":124,"am":124,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caloocan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1309},{"i":1692,"cid":"22PA0045","pid":"P00632777LZ","t":"Construction of Quidaoen - Cabcaburao Flood Control Structure (Phase 2), Barangay Quidaoen to Barangay Cabcaborao, San Juan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SAN JUAN (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49498154.0,"abc":48999946.28,"fy":"2022","sd":"02/17/2022","cd":"2022-11-08","lat":17.718971,"lon":120.719052,"sm":1314,"fm":1314,"tm":1314,"am":1314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quidaoen","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01017,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":728},{"i":1693,"cid":"23CG0146","pid":"P00740325LZ","t":"Construction of Flood Control Works Upstream Portion of Dalaquitan Bridge, Sto. Tomas, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTO TOMAS (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91674954.68,"abc":96500000.0,"fy":"2023","sd":"06/05/2023","cd":"2024-02-22","lat":15.004732,"lon":120.719052,"sm":1418,"fm":1418,"tm":1418,"am":1418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1310},{"i":1694,"cid":"24CK0102","pid":"P00838443LZ","t":"Rehabilitation of Existing Dike along Maet Creek (Left and Right Bank), D/S of Lara Bridge (Phase V), Sta. 3+004.50 - Sta. 3+479.5, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY","c":96497704.17,"abc":96499278.07,"fy":"2024","sd":"02/20/2024","cd":"2024-07-17","lat":15.458056,"lon":120.719444,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Maet","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":475.0,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1311},{"i":1695,"cid":"23E00150","pid":"P00740423LZ","t":"Construction of Shore Protection and Coastal Road Development along Barangay Poblacion 2, Sta. Cruz, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":241246839.2,"abc":241249999.1,"fy":"2023","sd":"04/13/2023","cd":"2024-02-10","lat":13.0749,"lon":120.7196,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1312},{"i":1696,"cid":"23DB0016","pid":"P00725837LZ","t":"Construction of Riverbank Protection along Binambang River, Sta. 0 + 000 - Sta. 0 + 536 (Upstream L/S) at Balayan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"VICMAR CONSTRUCTION, INC. / FRANDEL CONSTRUCTION AND DEVELOPMENT CORP.","c":96067745.81,"abc":96498760.0,"fy":"2023","sd":"04/03/2023","cd":"2023-12-12","lat":13.93893,"lon":120.71964,"sm":124,"fm":124,"tm":180,"am":124,"md":0.0,"ls":"inside","ww":"Binambang","wn":"Binambang River","wd":0.02,"wp":[13.93906,120.71981],"wst":"matched","br":null,"len":536.0,"ph":null,"dup":[],"run":[1512,1690],"cl":[],"L":"records","s":56,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":38.03,"text":"The record contradicts itself: the municipality field and the pin point to Balayan, Batangas, but the title names Batangas City, Batangas, 38 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DB0016 to 23DB0018) cover the same site, together worth PHP 250,465,266.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":136},{"i":1697,"cid":"22PA0343","pid":"P00639326LZ","t":"Construction of Paga Flood Control, Dolores, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DOLORES (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":95532900.0,"abc":95534927.27,"fy":"2022","sd":"11/08/2022","cd":"2023-01-06","lat":17.668771,"lon":120.719725,"sm":525,"fm":525,"tm":525,"am":525,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1313},{"i":1698,"cid":"23AA0152","pid":"P00727047LZ","t":"Construction of Flood Control Structure along Basbasa River (Right Bank), Barangay Payac, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":19599805.45,"abc":19599805.86,"fy":"2023","sd":"03/29/2023","cd":"2023-09-13","lat":18.485978,"lon":120.719968,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Basbasa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Payac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1314},{"i":1699,"cid":"22PA0072","pid":"P00631100LZ","t":"Construction of Banglolao-Labon Flood Control Structure, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":41158000.0,"abc":41159987.8,"fy":"2022","sd":"03/16/2022","cd":"2022-09-10","lat":17.536856,"lon":120.720141,"sm":235,"fm":235,"tm":235,"am":235,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1315},{"i":1700,"cid":"23C00170","pid":"P00742163LZ","t":"Construction of Tarlac City Urban Drainage System (Packages I), Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":99000000.0,"abc":98999074.83,"fy":"2023","sd":"09/11/2023","cd":"2024-06-06","lat":15.502815,"lon":120.595312,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package S","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1316},{"i":1701,"cid":"23C00169","pid":"P00742140LZ","t":"Construction of Tarlac City Urban Drainage System (Package R) Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":74250000.0,"abc":74249807.83,"fy":"2023","sd":"07/17/2023","cd":"2024-03-12","lat":15.50089,"lon":120.595375,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package R","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1317},{"i":1702,"cid":"23C00167","pid":"P00742129LZ","t":"Construction of Tarlac City Urban Drainage System (Package O), Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":148500000.0,"abc":148499594.2,"fy":"2023","sd":"12/05/2023","cd":"2024-10-29","lat":15.492438,"lon":120.595555,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package O","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1318},{"i":1703,"cid":"24PF0033","pid":"P00824668LZ","t":"Construction of Flood Mitigation Structure within Amburayan River: along Amburayan River Tributary, Central Kapangan Section, Sta. 8+125 - Sta. 8+193 (R.S), Sta. 8+125 - Sta. 8+265 (L.S), Sta. 0+000 - Sta. 0.+070 (L.S), Kapangan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KAPANGAN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"DJ AND C CONSTRUCTION SERVICES","c":14670528.86,"abc":14700000.0,"fy":"2024","sd":"06/20/2024","cd":"2024-09-23","lat":16.572765,"lon":120.595664,"sm":698,"fm":698,"tm":698,"am":698,"md":0.0,"ls":"inside","ww":"Amburayan","wn":"Amburayan River","wd":5.65,"wp":[16.61245,120.62898],"wst":"matched","br":null,"len":208.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.65,"text":"The title names Amburayan, which OpenStreetMap maps through the stated municipality, but the pin is 5.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":387},{"i":1704,"cid":"23AI0011","pid":"P00726058LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Sta. 0+000 - Sta. 0+296, Binalonan, Pangasinan (Package 13)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"CITY OF URDANETA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48895892.15,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-28","lat":16.03917,"lon":120.5958,"sm":205,"fm":434,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":296.0,"ph":"Package 13","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1319},{"i":1705,"cid":"24AI0018","pid":"P00821505LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 5)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"SOLID STAR BUILDERS AND CONSTRUCTION SUPPLY","c":48905055.49,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-05-30","lat":16.070375,"lon":120.595892,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[1741,1731,1099,1105],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24AI0016 to 24AI0020) cover the same site, together worth PHP 244,317,430.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":505},{"i":1706,"cid":"24CC0188","pid":"P00844503LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay San Isidro (Purok 4 to Purok 5), Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77198834.6,"abc":77199816.66,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.859176,"lon":120.74286,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1320},{"i":1707,"cid":"23CH0058","pid":"P00742349LZ","t":"Construction of Slope Protection, Sapang Matwa Creek, Sitio Dampalit, Purok 6, Brgy. Don Ignacio Dimson, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":21769230.0,"abc":21779169.77,"fy":"2023","sd":"04/20/2023","cd":"2023-09-16","lat":14.9631,"lon":120.5959,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Sapang Matwa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Don Ignacio Dimson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1321},{"i":1708,"cid":"23C00168","pid":"P00742138LZ","t":"Construction of Tarlac City Urban Drainage System (Package P), Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":148500000.0,"abc":148499489.5,"fy":"2023","sd":"07/17/2023","cd":"2024-06-10","lat":15.496704,"lon":120.595969,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package P","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1322},{"i":1709,"cid":"22CJ0073","pid":"P00630940LZ","t":"Construction of Tarlac City Urban Drainage System (Phase 4), Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":94570289.88,"abc":96500000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-11-20","lat":15.486017,"lon":120.596083,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1323},{"i":1710,"cid":"23CH0059","pid":"P00740611LZ","t":"Construction of Slope Protection at Sapang Matua, Sta. Monica-Don Ignatio Dimson, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"ARROW CONSTRUCTION","c":19592188.67,"abc":19599133.43,"fy":"2023","sd":"04/26/2023","cd":"2023-07-31","lat":14.963,"lon":120.5963,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1324},{"i":1711,"cid":"23AI0010","pid":"P00726057LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Sta. 0+000 - Sta. 0+296, Binalonan, Pangasinan (Package 12)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48873501.74,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-28","lat":16.04,"lon":120.5964,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":296.0,"ph":"Package 12","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":471},{"i":1712,"cid":"24CI0053","pid":"P00838368LZ","t":"Construction of Retaining Wall along Abacan Road Dike, Angeles City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":77193423.34,"abc":77195004.5,"fy":"2024","sd":"03/14/2024","cd":"2024-08-22","lat":15.1573,"lon":120.5964,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1325},{"i":1713,"cid":"24AI0031","pid":"P00820728LZ","t":"Construction of Tagamusing and Allied River, Barangay Moreno-Sta. Maria, Binalonan, Pangasinan (Package B)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48922351.16,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-03-18","lat":16.085572,"lon":120.59657,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Moreno-Sta. Maria","len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1326},{"i":1714,"cid":"22AI0029","pid":"P00620466LZ","t":"Construction of Flood Control Structure along Tagamusing River, Sta. 0+000 + Sta. 266.40, Brgy. Poblacion, Binalonan, Pangasinan (Package 9)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":44023866.89,"abc":44100000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-01","lat":16.0456,"lon":120.59667,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Tagamusing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":"Package 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1327},{"i":1715,"cid":"22CK0107","pid":"P00639348LZ","t":"Construction of Dike/Slope Protection Sacobia-Bamban River, Malonzo Area, Right Bank, U/S of SCTEX Bridge, Bamban, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"BAMBAN (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":96470264.1,"abc":96499392.07,"fy":"2022","sd":"03/26/2022","cd":"2023-03-08","lat":15.27496,"lon":120.59678,"sm":141,"fm":141,"tm":141,"am":141,"md":0.0,"ls":"inside","ww":"Sacobia-Bamban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1328},{"i":1716,"cid":"22A00207","pid":"P00641835LZ","t":"Construction of Slope Protection Structure of Rodolfo C.G. Fariñas, Jr. Science High School including Ground Improvement, Barangay 55-C Vira, Laoag City, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":33599149.35,"abc":33775000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-05-03","lat":18.222025,"lon":120.596962,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"55-C Vira","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1329},{"i":1717,"cid":"24A00456","pid":"P00823277LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 1, Sison - Binalonan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":48249872.89,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-31","lat":16.0659,"lon":120.597,"sm":1468,"fm":1468,"tm":null,"am":205,"md":3.02,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[1718,1719,1720],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.66,"value":3.02,"text":"The pin is 3.0 km outside Sison, Pangasinan, the nearest municipality the record claims. It falls in Binalonan, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 192,998,759.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":122},{"i":1718,"cid":"24A00457","pid":"P00823279LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 2, Sison - Binalonan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48249924.65,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-31","lat":16.0659,"lon":120.597,"sm":1468,"fm":1468,"tm":null,"am":205,"md":3.02,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[1717,1719,1720],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.66,"value":3.02,"text":"The pin is 3.0 km outside Sison, Pangasinan, the nearest municipality the record claims. It falls in Binalonan, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 192,998,759.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":123},{"i":1719,"cid":"24A00458","pid":"P00823281LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 3, Sison - Binalonan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48249532.57,"abc":48250000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-07-15","lat":16.0659,"lon":120.597,"sm":1468,"fm":1468,"tm":null,"am":205,"md":3.02,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[1717,1718,1720],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.66,"value":3.02,"text":"The pin is 3.0 km outside Sison, Pangasinan, the nearest municipality the record claims. It falls in Binalonan, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 192,998,759.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":124},{"i":1720,"cid":"24A00459","pid":"P00823283LZ","t":"Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 4, Sison - Binalonan, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SISON (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES)","c":48249428.51,"abc":48250000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-07-15","lat":16.0659,"lon":120.597,"sm":1468,"fm":1468,"tm":null,"am":205,"md":3.02,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 4","dup":[1717,1718,1719],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.66,"value":3.02,"text":"The pin is 3.0 km outside Sison, Pangasinan, the nearest municipality the record claims. It falls in Binalonan, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 192,998,759.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":125},{"i":1721,"cid":"24AI0030","pid":"P00820727LZ","t":"Construction of Tagamusing and Allied River, Barangay Moreno-Sta. Maria, Binalonan, Pangasinan (Package A)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48919930.89,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-03-15","lat":16.086368,"lon":120.597112,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Moreno-Sta. Maria","len":null,"ph":"Package A","dup":[1722],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,168,440.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":900},{"i":1722,"cid":"24AI0059","pid":"P00820722LZ","t":"Construction of Flood Mitigation Structure along Tagamusing and Allied River, Barangay Moreno to Barangay Sta. Maria, Binalonan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48248509.43,"abc":49000000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-05-15","lat":16.086368,"lon":120.597112,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Moreno","len":null,"ph":null,"dup":[1721],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,168,440.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":901},{"i":1723,"cid":"22CI0005","pid":"P00632854LZ","t":"Construction of Slope Protection Structure along Quitangil Creek, Station 21+485 to Station 22+577 (R/D), Barangay Mawaque, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":29399679.61,"abc":29399837.47,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":15.198334,"lon":120.597201,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.13,"wp":[15.21623,120.58992],"wst":"matched","br":"Mawaque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1330},{"i":1724,"cid":"22CI0024","pid":"P00631260LZ","t":"Construction of Slope Protection Structure along Sapangbalen Creek, Sta. 9+908 - Sta. 10+479, Sta. 18+228 - Sta. 18+602 (R/D), Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"WNR CONSTRUCTION AND TRADING","c":26411453.9,"abc":26455269.83,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":15.244885,"lon":120.597471,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":8.28,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":945.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1331},{"i":1725,"cid":"23AA0393","pid":"P00742253LZ","t":"Construction of Canal Lining, Brgy. 18, San Quirino, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4948884.77,"abc":4949525.13,"fy":"2023","sd":"04/12/2023","cd":"2023-07-25","lat":18.193925,"lon":120.597507,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"18","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1332},{"i":1726,"cid":"22AA0058","pid":"P00632724LZ","t":"Construction of Slope Protection of Rodolfo C.G. Fariñas, Jr. Science High School, Barangay Vira, Laoag City, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":29699636.24,"abc":29699636.26,"fy":"2022","sd":"02/18/2022","cd":"2023-02-17","lat":18.222748,"lon":120.597658,"sm":751,"fm":1638,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Vira","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1333},{"i":1727,"cid":"23CH0085","pid":"P00742356LZ","t":"Construction of Line Canal, Barangay San Antonio, Lubao, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"SUPREME BUILDERS CONSTRUCTION AND TRADING","c":4831150.28,"abc":4949796.44,"fy":"2023","sd":"06/14/2023","cd":"2023-09-26","lat":14.9389,"lon":120.5977,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1334},{"i":1728,"cid":"23PD0055","pid":"P00726403LZ","t":"Construction of Flood Mitigation Facilities/Drainage System along Balili River (Main) Sta. 0 + 000 - Sta. 1 + 400, Baguio City","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":82025000.0,"abc":82025000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-27","lat":16.4315,"lon":120.5978,"sm":110,"fm":110,"tm":110,"am":725,"md":0.01,"ls":"boundary","ww":"Balili","wn":"Balili River","wd":0.01,"wp":[16.43147,120.59786],"wst":"matched","br":null,"len":1400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1335},{"i":1729,"cid":"23PD0057","pid":"P00726656LZ","t":"Construction of Flood Mitigation Facilities/Drainage System along Bued River (Tributaries), Sta. 0 + 000 - Sta. 0 + 120, Sta. 0 + 223 - Sta. 0 + 533, Baguio City","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":49000000.0,"abc":126200000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-27","lat":16.3885,"lon":120.5978,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.82,"wp":[16.38397,120.60384],"wst":"matched","br":null,"len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1336},{"i":1730,"cid":"25CJ0132","pid":"P00921066LZ","t":"Rehabilitation of Sabo Dam including Drainage System at Tolega Norte CIS, Moncada, Tarlac","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"MONCADA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":14700000.0,"abc":14700000.0,"fy":"2025","sd":"01/27/2025","cd":"2025-05-19","lat":15.748532,"lon":120.59788,"sm":985,"fm":985,"tm":985,"am":985,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1337},{"i":1731,"cid":"24AI0017","pid":"P00821504LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 4)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48819534.05,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-04-29","lat":16.071345,"lon":120.597972,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[1741,1705,1099,1105],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24AI0016 to 24AI0020) cover the same site, together worth PHP 244,317,430.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":506},{"i":1732,"cid":"22PE0155","pid":"P00639452LZ","t":"Rehabilitation of Drainage Canal with Sidewalk and Steel Railings near Tiongan Residence towards Alip Residence at Sadiad, Balili, La Trinidad, Benguet","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"LA TRINIDAD (CAPITAL) (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"8-10 NEHEMIAH CONSTRUCTION","c":2934796.4,"abc":2940000.0,"fy":"2022","sd":"10/21/2022","cd":"2023-02-07","lat":16.433151,"lon":120.598171,"sm":725,"fm":725,"tm":725,"am":725,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1338},{"i":1733,"cid":"23AA0063","pid":"P00737412LZ","t":"Construction of Slope Protection, Purok Llamelo, Barangay 29, Pasngal, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"REMAR CONSTRUCTION","c":4949915.3,"abc":4949920.42,"fy":"2023","sd":"02/14/2023","cd":"2023-03-17","lat":18.277036,"lon":120.598359,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"29","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1339},{"i":1734,"cid":"23AA0166","pid":"P00727332LZ","t":"Rehabilitation of Damaged Concrete Bank Revetment along Laoag River Revetment (Bengang Creek), Barangay 12, San Isidro, Laoag City, Ilocos Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":9799234.59,"abc":9799314.63,"fy":"2023","sd":"04/20/2023","cd":"2023-10-23","lat":18.204405,"lon":120.598392,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"12","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1340},{"i":1735,"cid":"24AA0196","pid":"P00844705LZ","t":"Construction of Seawall, Barangay Caruan, Pasuquin, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PASUQUIN (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"HAUSLAND CONSTRUCTION","c":48999619.58,"abc":48999625.76,"fy":"2024","sd":"02/12/2024","cd":"2024-04-17","lat":18.384325,"lon":120.598542,"sm":1110,"fm":1110,"tm":1110,"am":1110,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1341},{"i":1736,"cid":"23CI0084","pid":"P00740633LZ","t":"Construction of Drainage in Brgy. Ninoy Aquino, Angeles City, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"P.V.B. CONSTRUCTION AND DEVELOPMENT CORP.","c":4895353.6,"abc":4899762.68,"fy":"2023","sd":"04/12/2023","cd":"2023-06-10","lat":15.158146,"lon":120.59868,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ninoy Aquino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1342},{"i":1737,"cid":"22CH0058","pid":"P00637781LZ","t":"Construction of Slope Protection along GPDC, Going to Bancal Sinubli, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"OMICRON CONSTRUCTION","c":19790941.34,"abc":19798731.75,"fy":"2022","sd":"04/13/2022","cd":"2022-09-09","lat":14.88774,"lon":120.59927,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1343},{"i":1738,"cid":"24PD0027","pid":"P00821529LZ","t":"Construction of Flood Mitigation Structure along Balili River (Tributaries) (Sta 0+620 - Sta 0+793), Baguio City","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":49000000.0,"abc":145500000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-29","lat":16.4267,"lon":120.5998,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":0.31,"wp":[16.42834,120.5975],"wst":"matched","br":null,"len":173.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1344},{"i":1739,"cid":"23AA0131","pid":"P00725641LZ","t":"Construction of Flood Control Structure along Bislak River, Sitio Wangagan, Brgy. Dagupan, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899902.46,"abc":57899987.46,"fy":"2023","sd":"03/13/2023","cd":"2023-09-15","lat":18.276092,"lon":120.600032,"sm":1638,"fm":1638,"tm":1638,"am":89,"md":4.84,"ls":"outside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dagupan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.73,"value":4.84,"text":"The pin is 4.8 km outside Vintar, Ilocos Norte, the nearest municipality the record claims. It falls in Bacarra, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":230},{"i":1740,"cid":"21CK0081","pid":"P00526056LZ","t":"Construction of San Juan Creek, Barangay San Juan, Concepcion, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"Concepcion","deo":"Tarlac 2nd District Engineering Office","co":"P.C. PANOPIO CONSTRUCTION AND TRADING","c":14028306.54,"abc":14699690.43,"fy":"2021","sd":"03/24/2022","cd":"2022-09-20","lat":15.3448,"lon":120.6001,"sm":448,"fm":null,"tm":448,"am":327,"md":0.23,"ls":"boundary","ww":"San Juan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1345},{"i":1741,"cid":"24AI0016","pid":"P00821503LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 3)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48831908.98,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-04-29","lat":16.071755,"lon":120.600288,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[1731,1705,1099,1105],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24AI0016 to 24AI0020) cover the same site, together worth PHP 244,317,430.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":507},{"i":1742,"cid":"24AI0013","pid":"P00821502LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 2)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48813804.25,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-04-29","lat":16.071728,"lon":120.600312,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1346},{"i":1743,"cid":"23CJ0216","pid":"P00742368LZ","t":"Construction of Concrete Lining in Barangay Sapang Tagalog, Tarlac City, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":14550786.21,"abc":14850000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-09-13","lat":15.419066,"lon":120.600557,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang Tagalog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1347},{"i":1744,"cid":"24AA0212","pid":"P00838492LZ","t":"Construction of Seawall, Barangay Nalvo, Pasuquin, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PASUQUIN (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"LINEAR CONSTRUCTION CORP.","c":48999933.39,"abc":48999942.46,"fy":"2024","sd":"02/14/2024","cd":"2024-08-30","lat":18.354854,"lon":120.600609,"sm":1110,"fm":1110,"tm":1110,"am":1110,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nalvo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1348},{"i":1745,"cid":"22CK0088","pid":"P00639372LZ","t":"Rehabilitation of Existing Bank along Lucung River, D/S of Cutcut Bridge (Left and Right Bank), Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":96483776.97,"abc":96499582.63,"fy":"2022","sd":"03/26/2022","cd":"2023-02-19","lat":15.324306,"lon":120.60085,"sm":327,"fm":327,"tm":327,"am":141,"md":0.03,"ls":"boundary","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1548,1003,1303],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22CK0085 to 22CK0088) cover the same site, together worth PHP 280,552,442.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":253},{"i":1746,"cid":"22PA0249","pid":"P00632759LZ","t":"Construction of Bugbog-Santa Rosa Flood Control Structure (Phase 2), Barangay Bugbog to Barangay Santa Rosa, Bucay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCAY (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / RM30 PSG CONSTRUCTION CORPORATION","c":29700000.0,"abc":29700000.0,"fy":"2022","sd":"09/12/2022","cd":"2023-04-07","lat":17.55389,"lon":120.601361,"sm":235,"fm":235,"tm":235,"am":1126,"md":7.68,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bugbog","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.68,"text":"The pin is 7.7 km outside Bucay, Abra, the nearest municipality the record claims. It falls in Pidigan, Abra.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":268},{"i":1747,"cid":"23CI0036","pid":"P00727145LZ","t":"Repair/Improvement of Reinforced Concrete Slope Protection along Sapang Balen Creek, Brgy. Sapang Balen, Mabalacat City, Pampanga - Phase 1","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":48938754.63,"abc":48987107.08,"fy":"2023","sd":"03/16/2023","cd":"2023-07-31","lat":15.247871,"lon":120.601818,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":7.77,"wp":[15.31113,120.63319],"wst":"matched","br":"Sapang Balen","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1349},{"i":1748,"cid":"24AI0012","pid":"P00821500LZ","t":"Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 1)","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48866052.4,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-04-29","lat":16.071223,"lon":120.602043,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1350},{"i":1749,"cid":"22CI0037","pid":"P00620545LZ","t":"Improvement of Slope Protection Structures along Abacan Creek (Downstream),  Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48988710.51,"abc":48994400.11,"fy":"2022","sd":"03/24/2022","cd":"2022-10-19","lat":15.159084,"lon":120.602172,"sm":61,"fm":61,"tm":null,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.09,"wp":[15.15832,120.60179],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1351},{"i":1750,"cid":"23CI0151","pid":"P00740631LZ","t":"Construction of Sapangbalen Road Dike, Mabalacat, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION)","c":34289957.79,"abc":34291087.27,"fy":"2023","sd":"06/05/2023","cd":"2023-11-01","lat":15.247311,"lon":120.602248,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1352},{"i":1751,"cid":"23PD0057","pid":"P00726404LZ","t":"Construction of Flood Mitigation Facilities/Drainage System along Bued River (Main) Sta. 3 + 930 - Sta. 4 + 615, Baguio City","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":77200000.0,"abc":126200000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-27","lat":16.3943,"lon":120.6024,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":1.15,"wp":[16.38397,120.60384],"wst":"matched","br":null,"len":685.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1353},{"i":1752,"cid":"23CH0044","pid":"P00740613LZ","t":"Construction of Slope Protection along Sapang Gumi, Sta. Catalina, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"DMDANAN CONSTRUCTION AND TRADING","c":29395338.07,"abc":29399894.38,"fy":"2023","sd":"04/11/2023","cd":"2023-07-04","lat":14.9159,"lon":120.6024,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1354},{"i":1753,"cid":"24AD0074","pid":"P00823300LZ","t":"Construction of Bacsayan River Control Structure, Gregorio Del Pilar, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"GREGORIO DEL PILAR (CONCEPCION) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":48249997.37,"abc":49000000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-12-03","lat":17.13242,"lon":120.60292,"sm":594,"fm":594,"tm":594,"am":594,"md":0.0,"ls":"inside","ww":"Bacsayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1355},{"i":1754,"cid":"24CI0028","pid":"P00821591LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil River, Barangay Bundagul, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":48972719.95,"abc":48983457.55,"fy":"2024","sd":"04/26/2024","cd":"2024-07-18","lat":15.2322,"lon":120.6035,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":0.86,"wp":[15.22691,120.6094],"wst":"matched","br":"Bundagul","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1356},{"i":1755,"cid":"24CK0022","pid":"P00820241LZ","t":"Construction of Groundsill Sacobia-Bamban River, Bamban, Tarlac","w":"Construction of Groundsill","rg":"Region III","pv":"TARLAC","mu":"BAMBAN (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":96491125.42,"abc":96499283.27,"fy":"2024","sd":"02/20/2024","cd":"2024-11-19","lat":15.2772,"lon":120.603828,"sm":141,"fm":141,"tm":141,"am":141,"md":0.0,"ls":"inside","ww":"Groundsill Sacobia-Bamban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1357},{"i":1756,"cid":"22AI0020","pid":"P00620966LZ","t":"Construction of Flood Control Structure along Agno River, Sta. 0+000 - Sta. 0+700, Brgy. Lipay-Caramutan, Villasis, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"ALCALA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"Z-5 CONSTRUCTION, INC.","c":19304256.05,"abc":19600000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-07-01","lat":15.8969,"lon":120.6039,"sm":1634,"fm":24,"tm":1634,"am":1634,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.59,"wp":[15.8959,120.60932],"wst":"matched","br":"Lipay-Caramutan","len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.14,"text":"The record contradicts itself: the title and the pin point to Villasis, Pangasinan, but the municipality field names Alcala, Pangasinan, 6 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":599},{"i":1757,"cid":"23AD0045","pid":"P00727078LZ","t":"Construction of Bacsayan River Control, Gregorio Del Pilar, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"GREGORIO DEL PILAR (CONCEPCION) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"VILLAR GENERAL CONSTRUCTION AND SUPPLIES","c":29398146.03,"abc":29400000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-05-28","lat":17.135487,"lon":120.604383,"sm":594,"fm":594,"tm":594,"am":594,"md":0.0,"ls":"inside","ww":"Bacsayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1358},{"i":1758,"cid":"22CH0068","pid":"P00637780LZ","t":"Construction of Slope Protection along GPDC going to Upper Dalan Bapor, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"VERET CONSTRUCTION","c":19794064.91,"abc":19799903.32,"fy":"2022","sd":"04/13/2022","cd":"2022-09-09","lat":14.900372,"lon":120.604679,"sm":816,"fm":816,"tm":816,"am":1430,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1359},{"i":1759,"cid":"23CI0113","pid":"P00740625LZ","t":"Construction of Drainage Brgy. San Isidro, Magalang, Pampanga Phase 2","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":4893938.64,"abc":4895142.01,"fy":"2023","sd":"05/16/2023","cd":"2023-07-14","lat":15.194409,"lon":120.604795,"sm":860,"fm":860,"tm":860,"am":840,"md":1.08,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1360},{"i":1760,"cid":"23CI0114","pid":"P00740627LZ","t":"Improvement/Rehabilitation/Construction of Drainage Sitio Pitabakan, Brgy San Idelfonso, Magalang, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":4896774.66,"abc":4899485.6,"fy":"2023","sd":"05/16/2023","cd":"2023-07-14","lat":15.1944,"lon":120.6048,"sm":860,"fm":860,"tm":860,"am":840,"md":1.08,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Idelfonso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1361},{"i":1761,"cid":"23CH0061","pid":"P00742348LZ","t":"Construction of Slope Protection, Sapang Matwa Creek, Sitio Dampalit, Brgy. Sta. Monica, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":17813873.03,"abc":17819287.97,"fy":"2023","sd":"04/20/2023","cd":"2023-09-16","lat":14.9593,"lon":120.6053,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":"Sapang Matwa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1362},{"i":1762,"cid":"22PD0019","pid":"P00620992LZ","t":"Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries), Sta. 0+030 - Sta. 0+530, Baguio City","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-01-20","lat":16.380839,"lon":120.605325,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Bued","wn":"Bued River","wd":0.07,"wp":[16.38131,120.60571],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1363},{"i":1763,"cid":"23CI0115","pid":"P00740629LZ","t":"Improvement/Rehabilitation of Drainage Brgy. Pandan, Angeles City, Pampanga","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"RD5 CONSTRUCTION","c":6655358.9,"abc":6856100.56,"fy":"2023","sd":"05/22/2023","cd":"2023-08-19","lat":15.154601,"lon":120.605411,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pandan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1364},{"i":1764,"cid":"24CI0049","pid":"P00823439LZ","t":"Construction of Flood Control Structures along Sapangbalen River Sta. 12+637 to Sta. 13+497, Mabalacat City,Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":96473359.74,"abc":96492979.08,"fy":"2024","sd":"03/04/2024","cd":"2024-06-18","lat":15.250039,"lon":120.605717,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":7.38,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":860.0,"ph":null,"dup":[],"run":[1779,1778],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0048 to 24CI0050) cover the same site, together worth PHP 289,434,425.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":254},{"i":1765,"cid":"22CI0016","pid":"P00632855LZ","t":"Construction of Slope Protection Structure along Quitangil Creek, Station 24+450 to Station 25+170 (R/D), Barangay Mawaque, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19592440.23,"abc":19598113.63,"fy":"2022","sd":"02/08/2022","cd":"2022-07-04","lat":15.200788,"lon":120.605762,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.3,"wp":[15.21791,120.59359],"wst":"matched","br":"Mawaque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1365},{"i":1766,"cid":"22CI0105","pid":"P00631258LZ","t":"Construction of Slope Protection Structure along Quitangil Creek, Sta. 15+954 - Sta. 16+900 (R/D), Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"SOLFIO P. JACINTO CONSTRUCTION INC.","c":25460698.55,"abc":25478844.55,"fy":"2022","sd":"03/24/2022","cd":"2022-09-09","lat":15.200847,"lon":120.606012,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.31,"wp":[15.21791,120.59359],"wst":"matched","br":null,"len":946.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1366},{"i":1767,"cid":"23CI0030","pid":"P00726186LZ","t":"Concreting of Shoulder along Abacan River Road Dike","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"R.G. DIAZ  BUILDERS & TRADING","c":9793241.05,"abc":9797066.56,"fy":"2023","sd":"02/08/2023","cd":"2023-04-17","lat":15.158829,"lon":120.606146,"sm":61,"fm":61,"tm":null,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.15857,120.60613],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1768],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,783,429.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1048},{"i":1768,"cid":"23CI0100","pid":"P00727147LZ","t":"Construction of Groundsill with Slope Protection along Abacan River, Downstream of NLEX Bridge, Angeles City, Pampanga","w":"Construction of Groundsill","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION)","c":48990187.47,"abc":48990974.53,"fy":"2023","sd":"04/25/2023","cd":"2023-09-21","lat":15.158829,"lon":120.606146,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.03,"wp":[15.15857,120.60613],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1767],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,783,429.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":902},{"i":1769,"cid":"22CG0064","pid":"P00631234LZ","t":"Construction of Drainage System at Potrero and Balas, Bacolor, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC.","c":27841795.85,"abc":29400000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-31","lat":15.03277,"lon":120.606251,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1367},{"i":1770,"cid":"23AA0286","pid":"P00740541LZ","t":"Construction of Slope Protection Structure at Siito Gumamela-Camia, Barangay 27-A, Pungtod, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4898846.44,"abc":4899995.68,"fy":"2023","sd":"03/29/2023","cd":"2023-07-17","lat":18.291124,"lon":120.606656,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"27-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1368},{"i":1771,"cid":"23CI0119","pid":"P00740357LZ","t":"Rehabilitation of Dike along Abacan River (D/S of Pandan Bridge) with Groundsill, Angeles City, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":57846215.82,"abc":57886159.41,"fy":"2023","sd":"05/16/2023","cd":"2023-11-11","lat":15.1583,"lon":120.606729,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Abacan","wn":"Abacan River","wd":0.04,"wp":[15.15863,120.60664],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1369},{"i":1772,"cid":"23AA0284","pid":"P00740539LZ","t":"Construction of Flood Control at Sitio Sayugen, Barangay Bani, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4899922.26,"abc":4899938.43,"fy":"2023","sd":"04/11/2023","cd":"2023-06-08","lat":18.270184,"lon":120.606973,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bani","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1370},{"i":1773,"cid":"23A00302","pid":"P00742260LZ","t":"Construction of Flood Control Structure along Bacarra River, Brgy. 1 Santa Rita, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":19799998.66,"abc":19800000.0,"fy":"2023","sd":"06/30/2023","cd":"2023-08-25","lat":18.250335,"lon":120.607143,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bacarra","wn":"Bacarra River","wd":0.05,"wp":[18.24992,120.60692],"wst":"matched","br":"1 Santa Rita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1371},{"i":1774,"cid":"23CJ0194","pid":"P00742375LZ","t":"Construction (Completion) of Drainage Canal including Site Development at Tarlac City General Hospital, Tarlac City","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"NORTHERN BUILDERS","c":98193228.59,"abc":99000000.0,"fy":"2023","sd":"03/16/2023","cd":"2024-01-09","lat":15.472294,"lon":120.607168,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1372},{"i":1775,"cid":"24AA0208","pid":"P00838488LZ","t":"Construction of Lined Canal, Barangay 27 Nuestra Senora de Soledad, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"TMT CONSTRUCTION","c":4899791.75,"abc":4899792.29,"fy":"2024","sd":"02/12/2024","cd":"2024-05-15","lat":18.195452,"lon":120.60745,"sm":751,"fm":751,"tm":751,"am":751,"md":0.0,"ls":"inside","ww":"Lined","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"27 Nuestra Senora de Soledad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1373},{"i":1776,"cid":"23CH0066","pid":"P00740604LZ","t":"Construction of Slope Protection along Barangay Natividad, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":48956417.43,"abc":48999196.33,"fy":"2023","sd":"04/24/2023","cd":"2023-10-20","lat":14.98192,"lon":120.60777,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Natividad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1374},{"i":1777,"cid":"23CH0045","pid":"P00742347LZ","t":"Construction of Slope Protection along San Jose Creek, San Jose Section,Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"RADIANS BUILDERS AND SUPPLY CORPORATION","c":29687166.72,"abc":29699360.14,"fy":"2023","sd":"04/11/2023","cd":"2023-09-07","lat":14.98182,"lon":120.60791,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"San Jose","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1375},{"i":1778,"cid":"24CI0050","pid":"P00823441LZ","t":"Construcrtion of Flood Control Structures along Sapangbalen River Sta. 5+766 to Sta. 6+628, Magalang, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":96475660.29,"abc":96479050.1,"fy":"2024","sd":"03/04/2024","cd":"2024-06-18","lat":15.250532,"lon":120.608065,"sm":860,"fm":860,"tm":860,"am":840,"md":0.74,"ls":"boundary","ww":"Sapangbalen","wn":"Sapang Balen","wd":7.23,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":862.0,"ph":null,"dup":[],"run":[1779,1764],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0048 to 24CI0050) cover the same site, together worth PHP 289,434,425.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":255},{"i":1779,"cid":"24CI0048","pid":"P00823440LZ","t":"Construction of Flood Control Structures along Sapangbalen River Sta. 14+250 to 15+107, Mabalacat City,Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":96485405.27,"abc":96488637.04,"fy":"2024","sd":"03/04/2024","cd":"2024-07-18","lat":15.250384,"lon":120.608524,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":7.23,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":857.0,"ph":null,"dup":[],"run":[1764,1778],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CI0048 to 24CI0050) cover the same site, together worth PHP 289,434,425.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":256},{"i":1780,"cid":"23CH0013","pid":"P00727133LZ","t":"Construction of Slope Protection along Banqueruan 1 River, Lubao, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"LUBAO (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":29393193.05,"abc":29398342.86,"fy":"2023","sd":"03/20/2023","cd":"2023-05-22","lat":14.938056,"lon":120.608611,"sm":816,"fm":816,"tm":816,"am":816,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1376},{"i":1781,"cid":"22CG0081","pid":"P00631245LZ","t":"Rehabilitation of Slope Protection at Maliwalu, Bacolor, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STAR PRIME PROPERTY DEVELOPERS, INC.","c":27846124.16,"abc":29400000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-08-19","lat":15.083791,"lon":120.608773,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1377},{"i":1782,"cid":"24CJ0232","pid":"P00846012LZ","t":"Construction of Drainage System, Barangay Pacpaco, San Manuel, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"SAN MANUEL (TARLAC)","deo":"Tarlac District Engineering Office","co":"HOR-VERT ENTERPRISES","c":5000000.0,"abc":4950000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-06-24","lat":15.775071,"lon":120.60881,"sm":1325,"fm":1325,"tm":1325,"am":1325,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pacpaco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":983},{"i":1783,"cid":"24CJ0027","pid":"P00820858LZ","t":"Construction of Flood Control Structure along Masalasa Creek (Segment L), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":45000000.0,"abc":44100000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-04-19","lat":15.479845,"lon":120.609089,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Masalasa","wn":"Masalasa Creek","wd":1.5,"wp":[15.47632,120.59555],"wst":"matched","br":null,"len":null,"ph":"Segment L","dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":674},{"i":1784,"cid":"23CJ0014","pid":"P00726198LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Delinquente Creek, Bacabac Section (Package 1), Camiling, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CAMILING (TARLAC)","deo":"Tarlac District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":48139898.83,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-04-24","lat":15.479783,"lon":120.6091,"sm":315,"fm":315,"tm":315,"am":432,"md":24.52,"ls":"outside","ww":"Delinquente","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[1785],"run":[],"cl":[],"L":"records","s":70,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":24.52,"text":"The pin is 24.5 km outside Camiling, Tarlac, the nearest municipality the record claims. It falls in City of Tarlac, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 141,745,242.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":51},{"i":1785,"cid":"23CJ0046","pid":"P00725733LZ","t":"Construction of Flood Control Structure along Masalasa Creek (Phase II), Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93605343.32,"abc":96500000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-08-18","lat":15.479783,"lon":120.6091,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Masalasa","wn":"Masalasa Creek","wd":1.5,"wp":[15.47632,120.59555],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[1784],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 141,745,242.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":94},{"i":1786,"cid":"23AA0101","pid":"P00725606LZ","t":"Construction of Flood Control along Bislak River, Barangay 1 - Barangay 8, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS / MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899975.88,"abc":58799445.2,"fy":"2023","sd":"03/13/2023","cd":"2023-05-15","lat":18.248733,"lon":120.609572,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1378},{"i":1787,"cid":"24CJ0268","pid":"P00844766LZ","t":"Costruction of Flood Control Structure, 1st Phase, Barangay Sta. Maria, San Manuel, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"SAN MANUEL (TARLAC)","deo":"Tarlac District Engineering Office","co":"RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS / T2B3 BUILDERS AND SUPPLIES CORP.","c":30000000.0,"abc":29400000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-08-04","lat":15.797856,"lon":120.609586,"sm":1325,"fm":1325,"tm":1325,"am":1325,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":729},{"i":1788,"cid":"22CI0001","pid":"P00632851LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek (Sta. 14+450 to Sta. 15+169 R/D), Mawaque, Mabalacat City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19597211.89,"abc":19597663.45,"fy":"2022","sd":"02/08/2022","cd":"2022-07-04","lat":15.204447,"lon":120.609764,"sm":840,"fm":840,"tm":840,"am":840,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":2.1,"wp":[15.22176,120.60184],"wst":"matched","br":null,"len":719.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1379},{"i":1789,"cid":"23AI0013","pid":"P00726055LZ","t":"Construction of Flood Control Structure along Tagamusing River, Sta. 0+000 - Sta. 1+548, barangay Mangcasuy, Binalonan, Pangasinan (Package 2)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BINALONAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":48901434.15,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-06","lat":16.07278,"lon":120.61,"sm":205,"fm":205,"tm":205,"am":205,"md":0.0,"ls":"inside","ww":"Tagamusing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangcasuy","len":1548.0,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":472},{"i":1790,"cid":"23AA0024","pid":"P00726040LZ","t":"Construction of Flood Control Structure along Bislak River, Barangay Sta. Rita, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":19599686.15,"abc":19599783.21,"fy":"2023","sd":"02/13/2023","cd":"2023-03-27","lat":18.248059,"lon":120.610562,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Rita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1380},{"i":1791,"cid":"24CJ0036","pid":"P00838534LZ","t":"Construction of Slope Protection Structure along Masalasa Creek, Tarlac City, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-24","lat":15.479551,"lon":120.610595,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Masalasa","wn":"Masalasa Creek","wd":1.65,"wp":[15.47632,120.59555],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":641},{"i":1792,"cid":"23AA0061","pid":"P00737407LZ","t":"Construction of Drainage Canal, Macario Castro. St., Bacarra, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"TMT CONSTRUCTION","c":4949131.55,"abc":4949444.13,"fy":"2023","sd":"02/13/2023","cd":"2023-05-13","lat":18.251672,"lon":120.610992,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1381},{"i":1793,"cid":"23AA0065","pid":"P00737408LZ","t":"Rehabilitation of Drainage System, Barangay 3, San andres II, Bacarra, Ilocos Norte","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":4949734.69,"abc":4949761.34,"fy":"2023","sd":"02/06/2023","cd":"2023-03-17","lat":18.250354,"lon":120.61109,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1382},{"i":1794,"cid":"22A00170","pid":"P00620781LZ","t":"Construction of Flood Control Structure along Padsan River and Tributary, Brgy. #24, Nagrebcan, San Nicolas, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SAN NICOLAS (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":96499998.07,"abc":96500000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-10-24","lat":18.17117,"lon":120.61208,"sm":1340,"fm":1340,"tm":1340,"am":1340,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.33,"wp":[18.17363,120.61383],"wst":"matched","br":"#24","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1383},{"i":1795,"cid":"23CI0042","pid":"P00740367LZ","t":"Construction of Slope Protection along Pulung Cacutud Creek, Barangay Cutud to Barangay Pulung Cacutud, Angeles City, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"525 CONSTRUCTION","c":57406420.66,"abc":57896117.94,"fy":"2023","sd":"05/08/2023","cd":"2023-09-07","lat":15.173196,"lon":120.61286,"sm":61,"fm":61,"tm":61,"am":61,"md":0.0,"ls":"inside","ww":"Pulung Cacutud","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cutud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1384},{"i":1796,"cid":"24AA0206","pid":"P00838486LZ","t":"Construction of Flood Control Structure, Barangay Teppang, Bacarra, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":9799416.2,"abc":9799440.4,"fy":"2024","sd":"02/13/2024","cd":"2024-04-16","lat":18.275643,"lon":120.612862,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Teppang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1385},{"i":1797,"cid":"23PD0056","pid":"P00726405LZ","t":"Construction of Flood Mitigation Facilities/Drainage System along Balili River (Tributaries), Sta. 1 + 525 - Sta. 2 + 130, Baguio City","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Baguio City District Engineering Office","co":"GOLDRICH CONSTRUCTION & TRADING","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-27","lat":16.4204,"lon":120.6129,"sm":110,"fm":110,"tm":110,"am":110,"md":0.0,"ls":"inside","ww":"Balili","wn":"Balili River","wd":1.87,"wp":[16.42834,120.5975],"wst":"matched","br":null,"len":605.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1386},{"i":1798,"cid":"22CK0098","pid":"P00639368LZ","t":"Rehabilitation of Dike along Lucung River (Brgy. Cubcub Section, Sta. -6+690 to Sta. -6+310 - Left Bank), Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":94756155.0,"abc":96499354.1,"fy":"2022","sd":"03/26/2022","cd":"2022-11-27","lat":15.328228,"lon":120.613328,"sm":327,"fm":327,"tm":327,"am":327,"md":0.0,"ls":"inside","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cubcub Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1387},{"i":1799,"cid":"23AA0285","pid":"P00740540LZ","t":"Construction of Slope Protection at Sitio 1-6, Barangay Teppang, Bacarra, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BACARRA (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"REMAR CONSTRUCTION","c":4898896.53,"abc":4899041.58,"fy":"2023","sd":"04/20/2023","cd":"2023-09-17","lat":18.276342,"lon":120.613388,"sm":89,"fm":89,"tm":89,"am":89,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Teppang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1388},{"i":1800,"cid":"23C00055","pid":"P00726540LZ","t":"Flood Control Works - Diking/Slope Protection of Pasig-Potrero River, Bacolor and Porac, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"PORAC (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":144750000.0,"abc":144749529.5,"fy":"2023","sd":"06/12/2023","cd":"2024-03-07","lat":15.0722,"lon":120.61356,"sm":1164,"fm":1164,"tm":null,"am":96,"md":2.33,"ls":"adjacent","ww":"Pasig-Potrero","wn":"Pasig-Potrero River","wd":0.01,"wp":[15.07219,120.61367],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1389},{"i":1801,"cid":"23CG0068","pid":"P00740602LZ","t":"Construction of Matubig Creek, Sta Ana, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTA ANA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"CHOLO CONSTRUCTION AND TRADING","c":37239843.68,"abc":39200000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-10-17","lat":15.102948,"lon":120.742993,"sm":1368,"fm":1368,"tm":1368,"am":1368,"md":0.0,"ls":"inside","ww":"Matubig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1390},{"i":1802,"cid":"22CC0091","pid":"P00620203LZ","t":"Rehabilitation of Major River System with Flood Control Structure at Bulusan, Calumpit, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":91467153.21,"abc":91467420.21,"fy":"2022","sd":"02/18/2022","cd":"2022-10-24","lat":14.91299,"lon":120.74313,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1391},{"i":1803,"cid":"23AA0105","pid":"P00725610LZ","t":"Construction of Flood Control Structure along Bislak River, DS Isic-Isic Bridge, Barangay Dagupan, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":48249976.85,"abc":48999715.77,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.353078,"lon":120.743439,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dagupan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1392},{"i":1804,"cid":"22CK0032","pid":"P00620851LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Macalong Section, Right Bank), U/S of Rio Chico Bridge, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":72855158.85,"abc":72857361.9,"fy":"2022","sd":"02/16/2022","cd":"2022-08-16","lat":15.46319,"lon":120.74388,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.4633,120.74402],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1887,1850],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CK0029 to 22CK0032) cover the same site, together worth PHP 218,910,561.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":393},{"i":1805,"cid":"22CI0063","pid":"P00637020LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Magalang, Pampanga Sta. 0+000 to Sta. 2+750 (L/D)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":70946981.78,"abc":72373496.9,"fy":"2022","sd":"03/24/2022","cd":"2022-10-27","lat":15.258021,"lon":120.744005,"sm":860,"fm":860,"tm":860,"am":71,"md":0.24,"ls":"boundary","ww":"Quitangil","wn":"Quitangil River","wd":0.01,"wp":[15.25808,120.74401],"wst":"matched","br":null,"len":2750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1393},{"i":1806,"cid":"22AD0056","pid":"P00632737LZ","t":"Construction of Drainage along Quirino-Patiacan Road, Quirino, Ilocos Sur","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS SUR","mu":"QUIRINO (ANGKAKI) (ILOCOS SUR)","deo":"Ilocos Sur 2nd District Engineering Office","co":"EJIEV CONSTRUCTION SERVICES","c":4949972.9,"abc":4950000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-04-05","lat":17.110305,"lon":120.744509,"sm":1194,"fm":1194,"tm":1194,"am":1194,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1394},{"i":1807,"cid":"24PE0063","pid":"P00848608LZ","t":"Construction of Barot Flood Control, Ambuklao, Bokod, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BOKOD (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES","c":69235331.85,"abc":69300000.0,"fy":"2024","sd":"06/19/2024","cd":"2024-12-16","lat":16.448431,"lon":120.744666,"sm":217,"fm":217,"tm":217,"am":217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1395},{"i":1808,"cid":"22CC0058","pid":"P00630945LZ","t":"Rehabilitation of River Protection Structure along Bulusan, Calumpit, Bulacan","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96498200.7,"abc":96499829.8,"fy":"2022","sd":"02/18/2022","cd":"2023-02-12","lat":14.915177,"lon":120.74494,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1396},{"i":1809,"cid":"23CK0052","pid":"P00727366LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Lara Section, Right Bank), Package 2, La Paz, Tarlac (Sta. 0+569 to Sta. 0+819)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"L.S.D.  CONSTRUCTION & SUPPLIES","c":47951981.5,"abc":48999752.63,"fy":"2023","sd":"02/28/2023","cd":"2023-09-18","lat":15.447546,"lon":120.745023,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.13,"wp":[15.44822,120.74601],"wst":"matched","br":null,"len":250.0,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1397},{"i":1810,"cid":"24CE0169","pid":"P00845998LZ","t":"Construction of Flood Control Structure along Rio Chico River, Sta. 5+938.10 - Sta. 5+978.10, Brgy. Sto. Rosario Young, Zaragoza, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ZARAGOZA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"KYRO BUILDERS, INC.","c":9800000.0,"abc":9900000.0,"fy":"2024","sd":"08/01/2024","cd":"2025-02-24","lat":15.459267,"lon":120.74519,"sm":1644,"fm":1644,"tm":1644,"am":1644,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.0,"wp":[15.45926,120.74518],"wst":"matched","br":"Sto. Rosario Young","len":40.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1398},{"i":1811,"cid":"23CC0182","pid":"P00740594LZ","t":"Construction of Flood Control Structures and Improvement of Waterways along Barangay Bulusan, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48999897.9,"abc":48999726.89,"fy":"2023","sd":"03/21/2023","cd":"2023-11-15","lat":14.915663,"lon":120.745295,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulusan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1399},{"i":1812,"cid":"23CE0060","pid":"P00726509LZ","t":"Construction of Flood Control Structure along Rio Chico River, Barangay Pasong Inchic, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / M.M. SERRANO CONSTRUCTION COMPANY","c":96490005.53,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-12-14","lat":15.665633,"lon":120.745355,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.66552,120.74543],"wst":"matched","br":"Pasong Inchic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1400},{"i":1813,"cid":"22CC0094","pid":"P00631185LZ","t":"Construction of Flood Control Structure along San Miguel, Barangay San Miguel, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":44076500.35,"abc":44099230.86,"fy":"2022","sd":"01/28/2022","cd":"2022-11-10","lat":14.918044,"lon":120.745358,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1401},{"i":1814,"cid":"23CC0158","pid":"P00737368LZ","t":"Construction of Flood Mitigation Structure, Palapat, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":69298893.2,"abc":69299709.02,"fy":"2023","sd":"02/13/2023","cd":"2023-09-07","lat":14.862092,"lon":120.745793,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1402},{"i":1815,"cid":"22EB0052","pid":"P00632929LZ","t":"Construction of Callejon Flood Control Structure, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":27102768.74,"abc":44550000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-10-16","lat":13.447669,"lon":120.746059,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1403},{"i":1816,"cid":"24AI0071","pid":"P00824655LZ","t":"Construction of Flood Control Structure along Agno-Bitong, Pobracion, Tayug, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":19567078.7,"abc":19600000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-06-30","lat":16.031908,"lon":120.746162,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1404},{"i":1817,"cid":"24A00371","pid":"P00824796LZ","t":"Construction of Flood Control Structure along Agno and Allied River, Brgy. Amistad-Poblacion, Tayug, Pangasinan, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":19299456.67,"abc":19300000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-10-25","lat":16.031161,"lon":120.746376,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Amistad-Poblacion","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1405},{"i":1818,"cid":"24AI0041","pid":"P00825213LZ","t":"Construction of Flood Control Structure along Viray-Depalo River, Brgy. Libertad, Tayug, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":48257831.51,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-08-15","lat":16.016057,"lon":120.746622,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":"Viray-Depalo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Libertad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1406},{"i":1819,"cid":"23CE0185","pid":"P00742334LZ","t":"Construction of Flood Control Structures along Casongsong River, Brgy. Casongsong, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":4899504.18,"abc":4950000.0,"fy":"2023","sd":"06/07/2023","cd":"2023-07-27","lat":15.673295,"lon":120.746688,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Casongsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casongsong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1407},{"i":1820,"cid":"24CE0125","pid":"P00824702LZ","t":"Construction of Flood Control Structure along Casongsong River, Barangay Casongsong, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MIVICO BUILDERS & DEVELOPERS","c":24601942.33,"abc":24846920.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-24","lat":15.623295,"lon":120.746688,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Casongsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casongsong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1408},{"i":1821,"cid":"23CE0046","pid":"P00726508LZ","t":"Construction of Flood Control Structure along Rio Chico River (Phase 1), Barangay Bacayao, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) / SOLFIO P. JACINTO CONSTRUCTION INC.","c":96494000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-12-14","lat":15.667846,"lon":120.746723,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.66787,120.74658],"wst":"matched","br":"Bacayao","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1409},{"i":1822,"cid":"24AI0074","pid":"P00845911LZ","t":"Construction of Slope Protection Structure along Banila and Allied River, Umingan, Pangasinan (Package 1)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":49443875.72,"abc":49500000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-06-15","lat":15.915961,"lon":120.746723,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[1986,1839],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AI0072 to 24AI0075) cover the same site, together worth PHP 148,332,914.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":477},{"i":1823,"cid":"23CE0120","pid":"P00742335LZ","t":"Construction of Flood Control Structures along Rio Chico River, Brgy. Bacayao, Guimba, Nueva Ecija (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":9800528.41,"abc":9900000.0,"fy":"2023","sd":"06/07/2023","cd":"2023-10-04","lat":15.667836,"lon":120.746787,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.66787,120.74658],"wst":"matched","br":"Bacayao","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1410},{"i":1824,"cid":"24CE0260","pid":"P00823429LZ","t":"Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Casongsong, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MIVICO BUILDERS & DEVELOPERS","c":47767411.9,"abc":48250000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-12-09","lat":15.668441,"lon":120.747019,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.0,"wp":[15.66844,120.74702],"wst":"matched","br":"Casongsong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1411},{"i":1825,"cid":"24CC0192","pid":"P00844501LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Sagrada Familia (Purok 4 to Purok 5), Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":67549901.28,"abc":67549804.71,"fy":"2024","sd":"03/11/2024","cd":"2024-06-11","lat":14.815915,"lon":120.747771,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sagrada Familia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1412},{"i":1826,"cid":"23A00170","pid":"P00726356LZ","t":"Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Maruaya, Piddig, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PIDDIG (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MGB CONSTRUCTION & TRADING","c":97464756.05,"abc":97465000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-12-12","lat":18.19745,"lon":120.74783,"sm":1125,"fm":1125,"tm":1125,"am":1125,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maruaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1413},{"i":1827,"cid":"24CC0190","pid":"P00843321LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Frances (Purok 4 to Purok 5), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":77187426.47,"abc":77199825.91,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.918258,"lon":120.747839,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Frances","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1414},{"i":1828,"cid":"24CE0195","pid":"P00845997LZ","t":"Construction of Flood Control Structure along Casongsong River, Brgy. Casongsong, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MIVICO BUILDERS & DEVELOPERS","c":4900498.26,"abc":4950000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-07-20","lat":15.672964,"lon":120.748043,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Casongsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casongsong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1415},{"i":1829,"cid":"24CC0140","pid":"P00823465LZ","t":"Construction of Flood Mitigation Structure at Frances, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":67549453.28,"abc":67549958.68,"fy":"2024","sd":"02/21/2024","cd":"2024-10-17","lat":14.917304,"lon":120.748365,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1416},{"i":1830,"cid":"22PA0187","pid":"P00621563LZ","t":"Rechanneling of Baay River, Lagangilang Section, Lagangilang, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LAGANGILANG (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497135.0,"abc":96500000.0,"fy":"2022","sd":"07/20/2022","cd":"2023-01-27","lat":17.578014,"lon":120.748531,"sm":732,"fm":732,"tm":732,"am":235,"md":0.05,"ls":"boundary","ww":"Baay","wn":"Baay River","wd":0.12,"wp":[17.57864,120.74942],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1417},{"i":1831,"cid":"23A00171","pid":"P00726357LZ","t":"Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Right Bank, barangay Maruaya, Piddig, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PIDDIG (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MGB CONSTRUCTION & TRADING","c":97464915.68,"abc":97465000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-11-22","lat":18.19722,"lon":120.74861,"sm":1125,"fm":1125,"tm":1125,"am":1125,"md":0.0,"ls":"inside","ww":"Laoag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maruaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1418},{"i":1832,"cid":"24CC0270","pid":"P00824697LZ","t":"Construction of Revetment at Barangay Sagrada, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":39199307.6,"abc":39199794.91,"fy":"2024","sd":"04/02/2024","cd":"2024-10-04","lat":14.816524,"lon":120.748662,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sagrada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1419},{"i":1833,"cid":"22CG0124","pid":"P00637777LZ","t":"Construction of Northville San Vicente Drainage Canal, Brgy. San Vicente, Apalit, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"LATO BUILDERS","c":4702569.67,"abc":4950000.0,"fy":"2022","sd":"05/26/2022","cd":"2022-07-11","lat":14.94261,"lon":120.74877,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Northville San Vicente Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1420},{"i":1834,"cid":"24CC0291","pid":"P00824696LZ","t":"Construction of Revetment at Barangay Sta. Elena, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":39199511.58,"abc":39199955.55,"fy":"2024","sd":"04/16/2024","cd":"2024-10-12","lat":14.817281,"lon":120.748901,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1421},{"i":1835,"cid":"23CK0039","pid":"P00727150LZ","t":"Rehabilitation of Existing dike along Rio Chico River (Barangay Guevarra Section, Right Bank), Sta. 6 + 651.00 to Sta. 6 + 900.00, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":46436450.98,"abc":47627563.65,"fy":"2023","sd":"02/28/2023","cd":"2023-06-11","lat":15.47747,"lon":120.74923,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.47746,120.74941],"wst":"matched","br":"Guevarra Section","len":249.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1422},{"i":1836,"cid":"22A00133","pid":"P00620780LZ","t":"Construction of Flood Control Structure along Dingris River, Laoag River Basin, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"DYLAN EQUIPMENT CONSTRUCTION AND SUPPLIES / SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"03/04/2022","cd":"2023-01-08","lat":18.29016,"lon":120.74962,"sm":751,"fm":751,"tm":null,"am":1638,"md":12.47,"ls":"outside","ww":"Dingris","wn":"Dingris River","wd":7.15,"wp":[18.2291,120.77155],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.47,"text":"The pin is 12.5 km outside Laoag City, Ilocos Norte, the nearest municipality the record claims. It falls in Vintar, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":157},{"i":1837,"cid":"24CG0252","pid":"P00846002LZ","t":"Construction of Slope Protection Structure, San Juan-San Joaquin Access Road, Brgy. San Joaquin, Santa Ana, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTA ANA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"JKOJ CONSTRUCTION SUPPLIES TRADING","c":9345618.93,"abc":9900000.0,"fy":"2024","sd":"09/13/2024","cd":"2025-02-03","lat":15.095104,"lon":120.749834,"sm":1368,"fm":1368,"tm":1368,"am":1368,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1423},{"i":1838,"cid":"24AI0223","pid":"P00825214LZ","t":"Construction of Flood Control Structure along Agno and Allied River, Brgy. Amistad-Poblacion, Tayug, Pangasinan, Phase II","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":19563819.79,"abc":19600000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-09-26","lat":16.03295,"lon":120.750039,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Amistad-Poblacion","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1424},{"i":1839,"cid":"24AI0075","pid":"P00845912LZ","t":"Construction of Slope Protection Structure along Banila and Allied River, Umingan, Pangasinan (Package 2)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":49442175.71,"abc":49500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-07-04","lat":15.917835,"lon":120.750316,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[1986,1822],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AI0072 to 24AI0075) cover the same site, together worth PHP 148,332,914.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":478},{"i":1840,"cid":"24CK0080","pid":"P00838446LZ","t":"Rehabilitation of Existing Dike along Parua River (Talimundoc-Marimla Section, Right Bank), Package A, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":96494656.2,"abc":96499329.91,"fy":"2024","sd":"03/16/2024","cd":"2024-10-15","lat":15.278833,"lon":120.750675,"sm":448,"fm":448,"tm":448,"am":1256,"md":0.15,"ls":"boundary","ww":"Parua","wn":"Parua River","wd":0.09,"wp":[15.27951,120.75014],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[1528,1544],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0078 to 24CK0080) cover the same site, together worth PHP 289,434,417.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":257},{"i":1841,"cid":"22CK0102","pid":"P00639373LZ","t":"Rehabilitation of Existing Dike along Lucung River (Magao Section, Right Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"11-16 CONSTRUCTION","c":50168947.82,"abc":50179743.9,"fy":"2022","sd":"03/26/2022","cd":"2023-01-31","lat":15.262553,"lon":120.750869,"sm":448,"fm":448,"tm":448,"am":71,"md":1.29,"ls":"adjacent","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1425},{"i":1842,"cid":"23CC0110","pid":"P00735988LZ","t":"Construction of Flood Mitigation Structures along Barangay San Pablo, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199981.45,"abc":77199802.36,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.831533,"lon":120.751083,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pablo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1426},{"i":1843,"cid":"24CC0193","pid":"P00843302LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Labangan Channel and its tributaries, Barangay San Pedro, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":72374051.06,"abc":72374787.39,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.839372,"lon":120.751198,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Labangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1427},{"i":1844,"cid":"23CC0310","pid":"P00726894LZ","t":"Construction of Revetment along Hagonoy River and its Tributaries at Barangay Santa Elena, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":57899990.29,"abc":57899792.13,"fy":"2023","sd":"03/14/2023","cd":"2023-07-03","lat":14.817139,"lon":120.752396,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":2.33,"wp":[14.82879,120.7344],"wst":"matched","br":"Santa Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1428},{"i":1845,"cid":"23CC0123","pid":"P00735983LZ","t":"Construction of Flood Mitigation Structures along Barangay Frances, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199999.65,"abc":77199864.07,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.914986,"lon":120.752414,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Frances","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1429},{"i":1846,"cid":"23CC0137","pid":"P00735990LZ","t":"Construction of Flood Mitigation Structures along Barangay Sta. Elena, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ALL EML CONSTRUCTION CORPORATION (FORMERLY: E.M.L. CONSTRUCTION & TRADING)","c":77199935.07,"abc":77199948.45,"fy":"2023","sd":"02/13/2023","cd":"2023-08-17","lat":14.817097,"lon":120.752427,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1430},{"i":1847,"cid":"23CC0383","pid":"P00740586LZ","t":"Construction of Flood Mitigation Structure at barangay Frances (Phase II), Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":48999979.8,"abc":48999719.21,"fy":"2023","sd":"04/03/2023","cd":"2023-08-31","lat":14.915,"lon":120.752777,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Frances","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1431},{"i":1848,"cid":"23CC0191","pid":"P00740378LZ","t":"Construction of Flood Control Facility, Brgy. Sta. Elena, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":144199874.9,"abc":144749736.4,"fy":"2023","sd":"03/28/2023","cd":"2023-10-24","lat":14.815842,"lon":120.752835,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1432},{"i":1849,"cid":"23CK0043","pid":"P00727149LZ","t":"Rehabilitation of Existing dike along Lucung River (Magao Section, Right Bank), Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":47696993.3,"abc":47725788.75,"fy":"2023","sd":"02/28/2023","cd":"2023-05-05","lat":15.325339,"lon":120.752872,"sm":448,"fm":448,"tm":448,"am":1256,"md":0.04,"ls":"boundary","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1467,1567,1031],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CK0040 to 23CK0043) cover the same site, together worth PHP 193,395,349.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":544},{"i":1850,"cid":"22CK0030","pid":"P00620849LZ","t":"Rehabilitation of Existing Bank along Rio Chico River (San Roque Section, Right Bank), D/S of Rio Chico Bridge, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":72842742.3,"abc":72374727.06,"fy":"2022","sd":"02/16/2022","cd":"2023-02-28","lat":15.44053,"lon":120.75343,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.44069,120.75351],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1887,1804],"cl":[],"L":"field","s":54,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CK0029 to 22CK0032) cover the same site, together worth PHP 218,910,561.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00647,"text":"Contract cost is 0.65% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":77},{"i":1851,"cid":"22CC0019","pid":"P00632821LZ","t":"Construction of River Protection along Barangay Frances, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":49498943.04,"abc":49499344.49,"fy":"2022","sd":"01/28/2022","cd":"2022-09-21","lat":14.914922,"lon":120.75367,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Frances","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1433},{"i":1852,"cid":"22CG0182","pid":"P00640524LZ","t":"Rehabilitation of Flood Mitigation Structure along Sapang Are Creek, Apalit, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":37619894.0,"abc":39600000.0,"fy":"2022","sd":"06/09/2022","cd":"2022-10-06","lat":14.956261,"lon":120.754364,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Sapang Are","wn":"Sapang Pare","wd":14.89,"wp":[14.83689,120.81812],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1434},{"i":1853,"cid":"23AA0146","pid":"P00725642LZ","t":"Construction of Flood Control Structure along Bislak River, Brgy. Cabangaran, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":53074891.66,"abc":53074892.22,"fy":"2023","sd":"04/20/2023","cd":"2023-09-15","lat":18.352652,"lon":120.754443,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabangaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1435},{"i":1854,"cid":"24CE0128","pid":"P00824701LZ","t":"Construction of Flood Control Structure along Labong River, Barangay San Cristobal, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":24254959.8,"abc":24500000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-08-21","lat":15.5515,"lon":120.75485,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.01,"wp":[15.55147,120.75474],"wst":"matched","br":"San Cristobal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1436},{"i":1855,"cid":"22CE0093","pid":"P00620167LZ","t":"Construction of Flood Control Structures along Cassanova Creek, Brgy. Nagpandayan, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SOLFIO P. JACINTO CONSTRUCTION INC. / MIVICO BUILDERS & DEVELOPERS","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/02/2022","cd":"2023-03-26","lat":15.588002,"lon":120.755076,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Cassanova","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nagpandayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1437},{"i":1856,"cid":"24CE0124","pid":"P00824700LZ","t":"Construction of Flood Control Structure along Cassanova Creek, Barangay Nagpandayan, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":48514625.05,"abc":49000000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-12-10","lat":15.589345,"lon":120.755349,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Cassanova","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nagpandayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1438},{"i":1857,"cid":"24CG0011","pid":"P00820260LZ","t":"Construction of Slope Protection Structure along Sapang Are River, Apalit, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":74883257.96,"abc":77200000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-11","lat":14.95662,"lon":120.755563,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Sapang Are","wn":"Sapang Pare","wd":14.86,"wp":[14.83689,120.81812],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1439},{"i":1858,"cid":"22CG0054","pid":"P00631241LZ","t":"Improvement of Panquiary River Control Structure at Brgy. San Isidro, San Simon, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN SIMON (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"NES-SAN BUILDERS","c":37239412.88,"abc":39200000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-02","lat":15.002858,"lon":120.75563,"sm":1359,"fm":1359,"tm":1359,"am":1359,"md":0.0,"ls":"inside","ww":"Panquiary","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1440},{"i":1859,"cid":"22AI0094","pid":"P00620969LZ","t":"Construction of Flood Control Structure along Banila River, Brgy. Cabalitian, Umingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":19403532.01,"abc":19600000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-02-21","lat":15.92967,"lon":120.7558,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.02,"wp":[15.92952,120.75594],"wst":"matched","br":"Cabalitian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1441},{"i":1860,"cid":"22CE0126","pid":"P00621162LZ","t":"Construction of Flood Control Structure along Labong River, Brgy. Villarosa (Phase 5), Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) / SOLFIO P. JACINTO CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/05/2022","cd":"2023-01-29","lat":15.546261,"lon":120.755882,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.02,"wp":[15.5463,120.75604],"wst":"matched","br":"Villarosa","len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1442},{"i":1861,"cid":"23A00050","pid":"P00726841LZ","t":"Construction of Flood Mitigation Structure along Madungon River, both bank, barangay Bagbago, Solsona, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SOLSONA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY / A.P.B. CONSTRUCTION","c":96499954.31,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-06-26","lat":18.074193,"lon":120.755993,"sm":1478,"fm":1478,"tm":1478,"am":517,"md":0.01,"ls":"boundary","ww":"Madungon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagbago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1443},{"i":1862,"cid":"23CE0031","pid":"P00725725LZ","t":"Construction of Flood Control Structure along Labong River, Barangay Villarosa, (Phase 6), Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / IJK MAE CONSTRUCTION INC.","c":96495000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-09-08","lat":15.545479,"lon":120.756045,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.02,"wp":[15.54554,120.75625],"wst":"matched","br":"Villarosa","len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1444},{"i":1863,"cid":"23CE0042","pid":"P00725709LZ","t":"Construction of Flood Control Structures along Labong River, Brgy. Poblacion Sur, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":96494899.85,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-11-15","lat":15.545968,"lon":120.756317,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.02,"wp":[15.54592,120.75613],"wst":"matched","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1445},{"i":1864,"cid":"24CC0342","pid":"P00844511LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Tibaguin, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FRAMECON BUILDERS","c":72371115.87,"abc":72374731.83,"fy":"2024","sd":"04/18/2024","cd":"2024-12-13","lat":14.774974,"lon":120.756484,"sm":612,"fm":612,"tm":612,"am":612,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tibaguin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1446},{"i":1865,"cid":"23CE0030","pid":"P00726164LZ","t":"Construction of Flood Control Structure along Labong River, Barangay Poblacion Sur, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":48993969.0,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-08-25","lat":15.543767,"lon":120.75669,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.02,"wp":[15.54381,120.75683],"wst":"matched","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1447},{"i":1866,"cid":"22CK0100","pid":"P00621576LZ","t":"Rehabilitation of Dike along Rio Chico River, Downstream of Rio Chico Bridge, Sta.0+943.75 to Sta.1+349.75 (Brgy. San Roque Section, Right Bank), La Paz, Tarlac","w":"Construction of Dike","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94547166.18,"abc":96499475.97,"fy":"2022","sd":"03/26/2022","cd":"2022-11-24","lat":15.43951,"lon":120.75684,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.43957,120.75686],"wst":"matched","br":"San Roque Section","len":406.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1448},{"i":1867,"cid":"23AA0135","pid":"P00725643LZ","t":"Construction of Purok Ligaya-Cabangaran Flood Control, Brgy. Cabangaran, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899734.38,"abc":57899735.81,"fy":"2023","sd":"03/13/2023","cd":"2023-09-15","lat":18.35374,"lon":120.757038,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabangaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1449},{"i":1868,"cid":"24CK0049","pid":"P00821307LZ","t":"Rehabilitation of Existing Dike along Rio Chico River, (Balanoy Section, Right Bank), Phase 2, Sta. (-) 5+594.31 to Sta. (-) 6+058.62, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":96497852.71,"abc":96498897.46,"fy":"2024","sd":"02/20/2024","cd":"2024-05-23","lat":15.409119,"lon":120.757392,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.40907,120.75746],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[1877,2242],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0048 to 24CK0050) cover the same site, together worth PHP 289,492,221.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":258},{"i":1869,"cid":"24CC0141","pid":"P00823466LZ","t":"Construction of Flood Mitigation Structure at Calizon, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77199509.85,"abc":77199988.14,"fy":"2024","sd":"02/21/2024","cd":"2024-10-17","lat":14.91457,"lon":120.757602,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1450},{"i":1870,"cid":"24EB0038","pid":"P00820969LZ","t":"Construction of Salagan Flood Control Structure, So. Proper Section, Barangay Casague, Santa Cruz, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Mindoro Occidental District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48995667.09,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-07-24","lat":13.09765,"lon":120.758116,"sm":1380,"fm":1377,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Casague","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":837.6,"text":"The record contradicts itself: the title and the pin point to Santa Cruz, Occidental Mindoro, but the municipality field names Santa Cruz, Davao del Sur, 838 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":536},{"i":1871,"cid":"23AA0130","pid":"P00725638LZ","t":"Construction of Flood Control Structure along Bislak River, Sitio Mangmanga, Brgy. Cabayo, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":53074753.39,"abc":53074754.2,"fy":"2023","sd":"03/13/2023","cd":"2023-09-18","lat":18.389959,"lon":120.758177,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1451},{"i":1872,"cid":"24CK0072","pid":"P00838438LZ","t":"Rehabilitation of Existing Dike along Lucung River (Magao Section, Right Bank), Package F, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497823.04,"abc":96499387.14,"fy":"2024","sd":"02/24/2024","cd":"2025-01-27","lat":15.322617,"lon":120.758217,"sm":448,"fm":448,"tm":448,"am":1256,"md":0.26,"ls":"boundary","ww":"Lucung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package F","dup":[],"run":[1043,1046,1310,1614,1012],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24CK0067 to 24CK0074) cover the same site, together worth PHP 578,975,493.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":259},{"i":1873,"cid":"24CE0193","pid":"P00823471LZ","t":"Construction of Flood Control Structure along Labong River, Barangay San Juan, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"M.M. SERRANO CONSTRUCTION COMPANY","c":47767298.86,"abc":48250000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-08-28","lat":15.537531,"lon":120.758931,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.0,"wp":[15.53753,120.75892],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1452},{"i":1874,"cid":"23A00077","pid":"P00725590LZ","t":"Construction/Rehabilitation/lmprovement of 800 LM Canal Lining Barangay Barcelona, Solsona, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SOLSONA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":9649819.12,"abc":9650000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-06-15","lat":18.112036,"lon":120.759022,"sm":1478,"fm":1478,"tm":1478,"am":1478,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barcelona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1453},{"i":1875,"cid":"22DB0029","pid":"P00631279LZ","t":"Construction of Seawall, Brgy. Carrenahan, Balayan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BALAYAN (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-30","lat":13.9332,"lon":120.7594,"sm":124,"fm":124,"tm":124,"am":124,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carrenahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1454},{"i":1876,"cid":"23PA0070","pid":"P00726390LZ","t":"Construction of Flood Control Structure along Ikmin River, Maguyepyep, Sallapadan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"SALLAPADAN (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":77200000.0,"abc":77199923.53,"fy":"2023","sd":"04/17/2023","cd":"2023-12-07","lat":17.44001,"lon":120.7594,"sm":1242,"fm":1242,"tm":1242,"am":1242,"md":0.0,"ls":"inside","ww":"Ikmin","wn":"Ikmin River","wd":0.85,"wp":[17.44154,120.75154],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1455},{"i":1877,"cid":"24CK0048","pid":"P00821306LZ","t":"Rehabilitation of Existing Dike along Rio Chico River, (Balanoy Section, Right Bank), Phase 1, Sta. (-)5+130 to Sta. (-)5+594.31, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96497236.09,"abc":96499491.16,"fy":"2024","sd":"02/24/2024","cd":"2024-08-25","lat":15.412411,"lon":120.759528,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.41231,120.75965],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[1868,2242],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0048 to 24CK0050) cover the same site, together worth PHP 289,492,221.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":260},{"i":1878,"cid":"23AA0107","pid":"P00725611LZ","t":"Construction of Flood Control Structures along Bislak River, Upstream Isic-Isic Br., Barangay Cabangaran, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899999.73,"abc":58799628.16,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.355073,"lon":120.759583,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabangaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1456},{"i":1879,"cid":"22CE0043","pid":"P00620149LZ","t":"Construction of Flood Control Structure along Labong River, Brgy. Caingin Tabing Ilog, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":91675000.0,"abc":91675000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-12-12","lat":15.572742,"lon":120.759841,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":1.65,"wp":[15.55864,120.75488],"wst":"matched","br":"Caingin Tabing Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1457},{"i":1880,"cid":"24CE0194","pid":"P00823436LZ","t":"Construction/Rehabilitation of Flood Control Structures along Labong River, Brgy. San Juan, Licab, Nueva Ecija (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"M.M. SERRANO CONSTRUCTION COMPANY","c":38217763.57,"abc":38600000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-08-28","lat":15.533913,"lon":120.760225,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":0.01,"wp":[15.53388,120.7601],"wst":"matched","br":"San Juan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1458},{"i":1881,"cid":"23CC0231","pid":"P00726899LZ","t":"Construction of Revetment along Labangan Channel and its Tributaries at Barangay Santa Elena, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":67531685.86,"abc":67549800.48,"fy":"2023","sd":"03/14/2023","cd":"2023-12-18","lat":14.812765,"lon":120.760281,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Labangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Santa Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1459},{"i":1882,"cid":"24EB0073","pid":"P00824744LZ","t":"Contruction of Protection Dike at Barangay Barahan, Santa Cruz, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Mindoro Occidental District Engineering Office","co":"D. DOLOR CONSTRUCTION","c":14699104.72,"abc":14700000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-25","lat":13.062703,"lon":120.760456,"sm":1380,"fm":1377,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":834.34,"text":"The record contradicts itself: the title and the pin point to Santa Cruz, Occidental Mindoro, but the municipality field names Santa Cruz, Davao del Sur, 834 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":600},{"i":1883,"cid":"23CC0227","pid":"P00726900LZ","t":"Construction of Revetment along Labangan Channel at Sitio Buga, Barangay Santa Elena, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":72373326.83,"abc":72374969.24,"fy":"2023","sd":"03/14/2023","cd":"2024-01-07","lat":14.814843,"lon":120.760693,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":"Labangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Santa Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1460},{"i":1884,"cid":"24CK0031","pid":"P00821222LZ","t":"Construction of Concrete Slope Protection Structure along Rio Chico River (Rizal Section, Right Bank), Phase 1, Sta. (-)3+286.90 to Sta. (-)3+595.67, La Paz, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP. / RPV RED MOUNTAIN KONSTRUCT, INC.","c":62593237.4,"abc":62724566.22,"fy":"2024","sd":"02/20/2024","cd":"2024-08-11","lat":15.424579,"lon":120.760922,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.4246,120.76104],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1461},{"i":1885,"cid":"24CC0367","pid":"P00823452LZ","t":"Construction of Revetment at Sta. Elena - San Pedro along Angat River at Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":38599137.21,"abc":38599906.81,"fy":"2024","sd":"04/23/2024","cd":"2024-10-19","lat":14.818283,"lon":120.760985,"sm":612,"fm":612,"tm":248,"am":612,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.81821,120.76167],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":7.19,"text":"The record contradicts itself: the municipality field and the pin point to Hagonoy, Bulacan, but the title names Bulacan, Bulacan, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":554},{"i":1886,"cid":"23AA0116","pid":"P00726354LZ","t":"Construction of Flood Mitigating Facilities along Bacarra-Vintar River and Tributaries, Barangay Cabayo, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":77199998.67,"abc":78399736.25,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.395268,"lon":120.760986,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bacarra-Vintar","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1462},{"i":1887,"cid":"22CK0029","pid":"P00620848LZ","t":"Rehabilitation of Existing Bank along Rio Chico River (Balanoy Section Right Bank), La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":73212660.32,"abc":73214793.89,"fy":"2022","sd":"02/16/2022","cd":"2023-03-15","lat":15.416294,"lon":120.761142,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.41627,120.76135],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[1850,1804],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CK0029 to 22CK0032) cover the same site, together worth PHP 218,910,561.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":394},{"i":1888,"cid":"24CG0173","pid":"P00820245LZ","t":"Construction of Revetment Wall (Pampanga Delta Development Project), Barangay Capalangan, Phase II, Apalit, Pampanga","w":"Construction of Revetment","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":74883912.45,"abc":77200000.0,"fy":"2024","sd":"05/22/2024","cd":"2025-03-05","lat":14.93597,"lon":120.7617,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capalangan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1463},{"i":1889,"cid":"23CK0045","pid":"P00726739LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Rizal-Balanoy Section, Right Bank) Package 1, La Paz, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"LA PAZ (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":44466852.2,"abc":46059071.4,"fy":"2023","sd":"01/31/2023","cd":"2023-05-09","lat":15.41756,"lon":120.7618,"sm":721,"fm":721,"tm":721,"am":721,"md":0.0,"ls":"inside","ww":"Rio Chico","wn":"Rio Chico","wd":0.02,"wp":[15.41746,120.76192],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1464},{"i":1890,"cid":"23CC0120","pid":"P00736008LZ","t":"Construction of Revetment at Iba, Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":28949442.09,"abc":28949304.9,"fy":"2023","sd":"02/13/2023","cd":"2023-09-10","lat":14.878008,"lon":120.762186,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1465},{"i":1891,"cid":"23AA0026","pid":"P00726048LZ","t":"Construction of Flood Control Structure along Buagao River (Left and Right Bank), Barangay San Lorenzo and Abaca, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY","c":29399566.58,"abc":29399646.31,"fy":"2023","sd":"02/13/2023","cd":"2023-06-20","lat":18.535263,"lon":120.763519,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Buagao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1466},{"i":1892,"cid":"24CC0011","pid":"P00838395LZ","t":"Construction of Riverbank Protection Structure at Barangay Carillo, Hagonoy, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199918.56,"abc":77199986.3,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.860888,"lon":120.76409,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carillo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1467},{"i":1893,"cid":"24EB0036","pid":"P00820967LZ","t":"Construction of Lusakan SIP Protection Work, Sta. Cruz, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":19598756.65,"abc":19600000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-07-19","lat":13.062135,"lon":120.764927,"sm":1380,"fm":1377,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":834.0,"text":"The record contradicts itself: the title and the pin point to Santa Cruz, Occidental Mindoro, but the municipality field names Santa Cruz, Davao del Sur, 834 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":601},{"i":1894,"cid":"24AI0171","pid":"P00845908LZ","t":"Construction of Flood Control Structure along Banila and Allied River in Barangay Gonzales - Sta. Maria, Umingan, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":29635732.16,"abc":29700000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-10-13","lat":15.9136,"lon":120.765151,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gonzales","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1468},{"i":1895,"cid":"22AI0080","pid":"P00620978LZ","t":"Construction of Flood Control Structure along Viray River, Brgy. Magallanes - Libertad, Tayug, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":47518542.66,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-09-03","lat":16.0231,"lon":120.76533,"sm":1558,"fm":1558,"tm":1558,"am":1558,"md":0.0,"ls":"inside","ww":"Viray","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magallanes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1469},{"i":1896,"cid":"24CC0181","pid":"P00823356LZ","t":"Constructionmprovement of Flood Mitigation Structure at Carillo, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77199909.53,"abc":77199919.57,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.860424,"lon":120.765576,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1470},{"i":1897,"cid":"21PA0226","pid":"P00561499LZ","t":"Construction of Manicbel Flood Control, Sallapadan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Sallapadan","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":96500000.0,"abc":97999929.55,"fy":"2021","sd":"01/11/2022","cd":"2022-10-08","lat":17.45582,"lon":120.76561,"sm":1242,"fm":null,"tm":1242,"am":1242,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1471},{"i":1898,"cid":"24CC0007","pid":"P00838384LZ","t":"Construction of Riverbank Protection Structure at Barangay Abulalas, Hagonoy, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199988.25,"abc":77199985.83,"fy":"2024","sd":"02/07/2024","cd":"2024-04-22","lat":14.853498,"lon":120.765717,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abulalas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1472},{"i":1899,"cid":"21P00065","pid":"P00561458LZ","t":"Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Mankayan","deo":"Benguet 2nd District Engineering Office","co":"RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":96500000.0,"abc":96486192.7,"fy":"2021","sd":"01/07/2022","cd":"2022-09-03","lat":16.91813,"lon":120.76584,"sm":921,"fm":null,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colalo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1473},{"i":1900,"cid":"24CH0087","pid":"P00823367LZ","t":"Construction of Slope Protection Works along Guagua River (Betis Section), Phase 2, Betis, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96493832.58,"abc":96499033.02,"fy":"2024","sd":"04/15/2024","cd":"2024-12-25","lat":14.9752,"lon":120.63724,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Guagua","wn":"Guagua River","wd":1.19,"wp":[14.96461,120.63529],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1474},{"i":1901,"cid":"24AA0086","pid":"P00820684LZ","t":"Construction of Flood Control Structure along Padsan River, Barangay 17 San Felipe, Sarrat, Ilocos Norte (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY / RED JEWEL BUILDERS","c":48999922.21,"abc":48999925.42,"fy":"2024","sd":"02/13/2024","cd":"2024-06-07","lat":18.124573,"lon":120.637518,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.08,"wp":[18.12524,120.63789],"wst":"matched","br":"17 San Felipe","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1475},{"i":1902,"cid":"22CG0083","pid":"P00631238LZ","t":"Construction of San Antonio-Concepcion Dike Road, Bacolor, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"B-12 CONSTRUCTION AND TRADING CORPORATION","c":44174884.0,"abc":46500000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-08-19","lat":15.0373,"lon":120.637863,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1476},{"i":1903,"cid":"22CI0003","pid":"P00632840LZ","t":"Construction of Concrete Slope Protection Structure along Sapangbalen Creek (Sta. 11+803 to Sta. 12+504 R/D), Barangay Sto. Rosario, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":18974602.76,"abc":19597956.57,"fy":"2022","sd":"02/08/2022","cd":"2022-07-04","lat":15.26762,"lon":120.63815,"sm":860,"fm":860,"tm":860,"am":448,"md":0.72,"ls":"boundary","ww":"Sapangbalen","wn":"Sapang Balen","wd":4.85,"wp":[15.31113,120.63319],"wst":"matched","br":"Sto. Rosario","len":701.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1477},{"i":1904,"cid":"22CI0025","pid":"P00630942LZ","t":"Improvement of Slope Protection Structures along Abacan Creek (Downstream), Sta. 0 + 000 - Sta. 1 + 960, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ANGELES CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":57866110.17,"abc":58791612.58,"fy":"2022","sd":"03/17/2022","cd":"2022-11-11","lat":15.1507,"lon":120.6387,"sm":61,"fm":61,"tm":null,"am":970,"md":0.23,"ls":"boundary","ww":"Abacan","wn":"Abacan River","wd":0.05,"wp":[15.15023,120.63866],"wst":"matched","br":null,"len":1960.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1478},{"i":1905,"cid":"23CK0007","pid":"P00726515LZ","t":"Construction of groundsill with reinforced concrete slope protection along Parua river, downstream of San Francisco Bridge, Concepcion, Tarlac","w":"Construction of Groundsill","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":86826737.78,"abc":86849910.65,"fy":"2023","sd":"02/07/2023","cd":"2023-08-09","lat":15.293633,"lon":120.639578,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1479},{"i":1906,"cid":"23CJ0137","pid":"P00742374LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Inerangan River (Package D) Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"NIECER TRADING AND BUILDER COMPANY INC.","c":14850000.0,"abc":14850000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-07-18","lat":15.663564,"lon":120.639642,"sm":1200,"fm":1200,"tm":432,"am":1200,"md":0.0,"ls":"inside","ww":"Inerangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package D","dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":12.74,"text":"The record contradicts itself: the municipality field and the pin point to Ramos, Tarlac, but the title names City of Tarlac, Tarlac, 13 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":602},{"i":1907,"cid":"25CJ0031","pid":"P00921072LZ","t":"Construction of Flood Control Structures along Susubaen Creek (Segment 41), Ramos, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":47496290.56,"abc":49000000.0,"fy":"2025","sd":"01/27/2025","cd":"2025-04-16","lat":15.684142,"lon":120.6398,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Susubaen","wn":"Susubaen River","wd":0.01,"wp":[15.68426,120.6398],"wst":"matched","br":null,"len":null,"ph":"Segment 41","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1480},{"i":1908,"cid":"23CH0033","pid":"P00742343LZ","t":"Construction of Slope Protection along Labuan River (Guagua-Minalin Road), Sta. Ursula Section, Betis, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"CEDAR CONSTRUCTION","c":29694402.01,"abc":29699359.49,"fy":"2023","sd":"04/05/2023","cd":"2023-09-01","lat":14.9513,"lon":120.6401,"sm":595,"fm":595,"tm":595,"am":978,"md":0.1,"ls":"boundary","ww":"Labuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1481},{"i":1909,"cid":"24CE0170","pid":"P00845995LZ","t":"Construction of Drainage Structure, Brgy. Cabaducan West, Nampicuan, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"NAMPICUAN (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"MJ O. BETIS BUILDERS","c":4900504.0,"abc":4950000.0,"fy":"2024","sd":"06/21/2024","cd":"2024-08-19","lat":15.741164,"lon":120.640115,"sm":1010,"fm":1010,"tm":1010,"am":1010,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaducan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1482},{"i":1910,"cid":"23PA0047","pid":"P00740305LZ","t":"Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":144747500.0,"abc":144749968.2,"fy":"2023","sd":"04/14/2023","cd":"2023-12-24","lat":17.633533,"lon":120.641207,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1483},{"i":1911,"cid":"22PA0108","pid":"P00637009LZ","t":"Construction of Toon-San Gregorio Flood Control, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":96497000.0,"abc":96499992.73,"fy":"2022","sd":"06/20/2022","cd":"2022-12-05","lat":17.633869,"lon":120.641215,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1484},{"i":1912,"cid":"22CG0068","pid":"P00631239LZ","t":"Construction of San Vicente-San Antonio Dike Road, Bacolor, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":47284965.33,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-23","lat":15.028542,"lon":120.641692,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1485},{"i":1913,"cid":"24PA0037","pid":"P00839466LZ","t":"Construction of Salangsang Flood Control Structure, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":148497500.8,"abc":144750000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-18","lat":17.65513,"lon":120.64203,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":38,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02589,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":395},{"i":1914,"cid":"23CH0004","pid":"P00726175LZ","t":"Construction of Concrete Slope Protection along Dalan Bapor, Santa Monica, Sasmuan, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"SASMUAN (SEXMOAN) (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"R.M. VITUG CONSTRUCTION","c":29392979.38,"abc":29399219.48,"fy":"2023","sd":"02/27/2023","cd":"2023-06-07","lat":14.922717,"lon":120.6421,"sm":1430,"fm":1430,"tm":1430,"am":1430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1486},{"i":1915,"cid":"21PA0253","pid":"P00561514LZ","t":"Construction of Sinalang Flood Control, Peñarrubia, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Peñarrubia","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497036.15,"abc":97999990.0,"fy":"2021","sd":"01/17/2022","cd":"2022-07-28","lat":17.555281,"lon":120.642168,"sm":1120,"fm":null,"tm":1120,"am":1120,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1487},{"i":1916,"cid":"24CK0043","pid":"P00821301LZ","t":"Rehabilitation of Existing Dike along O'Donnell River (Bueno Section, Left Bank), Phase 7, Capas, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CAPAS (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"ALPIZ CONSTRUCTION & DEVELOPMENT CORPORATION","c":96497427.33,"abc":96499518.55,"fy":"2024","sd":"02/20/2024","cd":"2024-08-21","lat":15.28118,"lon":120.64223,"sm":327,"fm":327,"tm":327,"am":448,"md":6.01,"ls":"outside","ww":"O'Donnell","wn":"O' Donnel River","wd":17.13,"wp":[15.40469,120.54617],"wst":"matched","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"records","s":74,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":6.01,"text":"The pin is 6.0 km outside Capas, Tarlac, the nearest municipality the record claims. It falls in Concepcion, Tarlac.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.76,"value":17.13,"text":"The title names O'Donnell, which OpenStreetMap maps through the stated municipality, but the pin is 17.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":36},{"i":1917,"cid":"21CK0086","pid":"P00526057LZ","t":"Rehabilitaiton of Existing Dike along Tinang Creek, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"Concepcion","deo":"Tarlac 2nd District Engineering Office","co":"LAP GLOBAL CONSTRUCTION CORPORATION(FORMERLY LAP GLOBAL CONSTRUCTION)","c":14031745.6,"abc":14699370.29,"fy":"2021","sd":"03/24/2022","cd":"2022-07-17","lat":15.38,"lon":120.6426,"sm":448,"fm":null,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Tinang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":555},{"i":1918,"cid":"24AA0119","pid":"P00820679LZ","t":"Construction of Flood Control Structure along Bislak River, Downstream Bridge, Barangay San Ramon, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"HEKLER BUILDERS CORP.","c":24499910.02,"abc":24499913.15,"fy":"2024","sd":"02/27/2024","cd":"2024-08-14","lat":18.236678,"lon":120.644013,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Ramon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1488},{"i":1919,"cid":"24CJ0023","pid":"P00820863LZ","t":"Construction of Slope Protection Structure along Susubaen Creek (Segment A), Ramos, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"RAMOS (TARLAC)","deo":"Tarlac District Engineering Office","co":"GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS)","c":50000000.0,"abc":49000000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-08-19","lat":15.681472,"lon":120.644714,"sm":1200,"fm":1200,"tm":1200,"am":1200,"md":0.0,"ls":"inside","ww":"Susubaen","wn":"Susubaen River","wd":0.0,"wp":[15.68147,120.64473],"wst":"matched","br":null,"len":null,"ph":"Segment A","dup":[],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.45,"value":1.02041,"text":"Contract cost is 2.04% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":642},{"i":1920,"cid":"22CI0004","pid":"P00632839LZ","t":"Construction of Concrete Slope Protection along Sapangbalen Creek, Station 11+103 to Station 11+803 (R/D), Sto. Rosario, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":19589296.02,"abc":19597353.47,"fy":"2022","sd":"02/08/2022","cd":"2022-07-04","lat":15.25897,"lon":120.6448,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":5.91,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1489},{"i":1921,"cid":"23CI0124","pid":"P00740360LZ","t":"Construction of Slope Protection Structure along Sapang Balen Creek, Barangays Bundagul to San Ildefonso, Magalang and Mabalacat, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING / P.V.B. CONSTRUCTION & TRADING","c":62698462.89,"abc":62710621.21,"fy":"2023","sd":"05/24/2023","cd":"2023-11-09","lat":15.2593,"lon":120.644961,"sm":860,"fm":860,"tm":null,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":5.88,"wp":[15.31113,120.63319],"wst":"matched","br":"Bundagul","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1490},{"i":1922,"cid":"24AA0107","pid":"P00824639LZ","t":"Construction of Flood Mitigating Structure along Padsan River, Barangay Santo Tomas, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"BJMJB CONSTRUCTION & SUPPLY","c":39199934.38,"abc":39199950.6,"fy":"2024","sd":"03/04/2024","cd":"2024-06-07","lat":18.13363,"lon":120.644966,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":1.06,"wp":[18.12426,120.64295],"wst":"matched","br":"Santo Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1491},{"i":1923,"cid":"22AA0145","pid":"P00639417LZ","t":"Construction of Flood Control Dike along Kabuayan Creek, Burgos, Ilocos Norte","w":"Construction of Dike","rg":"Region I","pv":"ILOCOS NORTE","mu":"BURGOS (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ASIAN PEARL CONSTRUCTION & DEVT. CORP.","c":48251876.53,"abc":48999686.33,"fy":"2022","sd":"04/04/2022","cd":"2023-02-07","lat":18.510282,"lon":120.645152,"sm":258,"fm":258,"tm":258,"am":258,"md":0.0,"ls":"inside","ww":"Kabuayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1492},{"i":1924,"cid":"23CJ0159","pid":"P00742376LZ","t":"Construction of Slope Protection with Steel Sheet Pile Foundation along Masalasa Creek, Tarlac City (Package C)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CITY OF TARLAC (CAPITAL) (TARLAC)","deo":"Tarlac District Engineering Office","co":"CDC CONSTRUCTION & SUPPLIES","c":73134542.26,"abc":74250000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-08-18","lat":15.477636,"lon":120.645881,"sm":432,"fm":432,"tm":432,"am":432,"md":0.0,"ls":"inside","ww":"Masalasa","wn":"Masalasa Creek","wd":5.4,"wp":[15.47632,120.59555],"wst":"matched","br":null,"len":null,"ph":"Package C","dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.4,"text":"The title names Masalasa, which OpenStreetMap maps through the stated municipality, but the pin is 5.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":298},{"i":1925,"cid":"23AA0028","pid":"P00726042LZ","t":"Construction of Flood Control Structure along Padsan River, Downstream Sarrat Br., Leftbank, Sto. Tomas, Sarrat, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"SARRAT (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"CMG JR. BUILDERS","c":39198999.12,"abc":39199472.83,"fy":"2023","sd":"02/17/2023","cd":"2023-06-21","lat":18.131464,"lon":120.646217,"sm":1429,"fm":1429,"tm":1429,"am":1429,"md":0.0,"ls":"inside","ww":"Padsan","wn":"Padsan River","wd":0.87,"wp":[18.12426,120.64295],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1493},{"i":1926,"cid":"22PE0078","pid":"P00639442LZ","t":"Construction (Completion) of Flood Control Structure at Gumatdang River (Near Abanes Residence), Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"NINETY ONE BUILDERS","c":1957356.76,"abc":1960000.0,"fy":"2022","sd":"07/18/2022","cd":"2022-09-14","lat":16.379505,"lon":120.646861,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Gumatdang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1494},{"i":1927,"cid":"23CH0056","pid":"P00740612LZ","t":"Construction of Slope Protection along Betis River, Sta. Ines Section, Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"M.C. GERONIMO CONSTRUCTION AND TRADING","c":28663290.77,"abc":29398018.42,"fy":"2023","sd":"04/26/2023","cd":"2023-06-15","lat":14.981354,"lon":120.646878,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Betis","wn":"Betis River","wd":0.83,"wp":[14.97599,120.64148],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1495},{"i":1928,"cid":"22CH0082","pid":"P00639359LZ","t":"Construction of Slope Protection Structure along Betis River and its Tributaries at Guagua, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96491313.16,"abc":96499993.68,"fy":"2022","sd":"06/01/2022","cd":"2022-11-27","lat":14.98122,"lon":120.64692,"sm":595,"fm":595,"tm":null,"am":595,"md":0.0,"ls":"inside","ww":"Betis","wn":"Betis River","wd":0.82,"wp":[14.97599,120.64148],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1496},{"i":1929,"cid":"22CK0077","pid":"P00637023LZ","t":"Construction of Slope Protection Structure, Sacobia-Bamban River, Left Bank, Brgy. San Francisco, Concepcion, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":93169679.22,"abc":96499518.84,"fy":"2022","sd":"03/26/2022","cd":"2022-11-24","lat":15.29988,"lon":120.64723,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Sacobia-Bamban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1497},{"i":1930,"cid":"21PA0242","pid":"P00561505LZ","t":"Construction of Patiao Flood Control, Peñarrubia, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Peñarrubia","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497024.03,"abc":97999951.72,"fy":"2021","sd":"01/13/2022","cd":"2022-07-21","lat":17.554823,"lon":120.647403,"sm":1120,"fm":null,"tm":1120,"am":1120,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1498},{"i":1931,"cid":"24CG0009","pid":"P00839588LZ","t":"Construction of Drainage Structure, Tangle, Mexico, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MEXICO (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC.","c":6562708.65,"abc":6930000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-21","lat":15.170215,"lon":120.647974,"sm":970,"fm":970,"tm":970,"am":970,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1499},{"i":1932,"cid":"22CH0064","pid":"P00637026LZ","t":"Rehabilitation/Improvement of Guagua River, Sta. Ursula-San Rafael, Guagua, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"GUAGUA (PAMPANGA)","deo":"Pampanga 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96476999.14,"abc":96499419.88,"fy":"2022","sd":"04/18/2022","cd":"2022-12-13","lat":14.965544,"lon":120.647989,"sm":595,"fm":595,"tm":595,"am":595,"md":0.0,"ls":"inside","ww":"Guagua","wn":"Guagua River","wd":1.37,"wp":[14.96461,120.63529],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1500},{"i":1933,"cid":"23PA0022","pid":"P00726394LZ","t":"Construction of Flood Control Structure along Abra Major River Basin (Phase II), Cabaroan, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96500000.0,"abc":96499879.44,"fy":"2023","sd":"03/30/2023","cd":"2023-07-28","lat":17.62142,"lon":120.6483,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":"Abra Major","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[1321,1025,1505],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23PA0019 to 23PA0022) cover the same site, together worth PHP 385,999,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":202},{"i":1934,"cid":"23CI0129","pid":"P00742364LZ","t":"Construction of Reinforced Concrete Slope Protection along Sapang Balen River, Sitio Mapiña, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":19797019.05,"abc":19777019.85,"fy":"2023","sd":"05/24/2023","cd":"2023-10-20","lat":15.260963,"lon":120.648385,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapang Balen","wn":"Sapang Balen","wd":5.79,"wp":[15.31113,120.63319],"wst":"matched","br":null,"len":null,"ph":null,"dup":[1935],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 87,338,551.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":214},{"i":1935,"cid":"23CI0138","pid":"P00740321LZ","t":"Construction of River Control with Groundsill along Sapangbalen Creek (left dike) at Barangay San Roque and Barangay Santa Maria, Mabalacat City, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"R.D. POLICARPIO & COMPANY INC.","c":67541531.91,"abc":67541764.68,"fy":"2023","sd":"05/22/2023","cd":"2023-11-17","lat":15.260963,"lon":120.648385,"sm":840,"fm":840,"tm":840,"am":860,"md":3.4,"ls":"outside","ww":"Sapangbalen","wn":"Sapang Balen","wd":5.79,"wp":[15.31113,120.63319],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[1934],"run":[],"cl":[],"L":"records","s":72,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.68,"value":3.4,"text":"The pin is 3.4 km outside Mabalacat City, Pampanga, the nearest municipality the record claims. It falls in Magalang, Pampanga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 87,338,551.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":43},{"i":1936,"cid":"23CI0096","pid":"P00727142LZ","t":"Construction and Rehabilitation of Concrete Slope Protection along Quitangil Creek at Brgy La Paz, Magalang, Pampanga Phase 1","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"C.L. MORALES CONSTRUCTION AND TRADING","c":48938390.76,"abc":48994284.98,"fy":"2023","sd":"04/25/2023","cd":"2023-09-29","lat":15.225,"lon":120.649679,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":0.01,"wp":[15.22493,120.64968],"wst":"matched","br":"La Paz","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1501},{"i":1937,"cid":"23CI0142","pid":"P00740322LZ","t":"Construction of Concrete Slope Protection with Groundsill along Quitangil Creek at Barangay Santa Lucia, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"R.D. POLICARPIO & COMPANY INC.","c":57889523.69,"abc":57890506.12,"fy":"2023","sd":"05/22/2023","cd":"2023-10-28","lat":15.225,"lon":120.6497,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":0.01,"wp":[15.22493,120.6497],"wst":"matched","br":"Santa Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1502},{"i":1938,"cid":"22CI0114","pid":"P00637019LZ","t":"Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Magalang, Pampanga Sta. 13+310 to Sta. 14+452 (L/D)","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE / THREE-IN-ONE CONSTRUCTION & TRADING","c":72354878.48,"abc":72368249.63,"fy":"2022","sd":"03/24/2022","cd":"2022-11-26","lat":15.224913,"lon":120.649784,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil Creek","wd":0.0,"wp":[15.22493,120.64978],"wst":"matched","br":null,"len":1142.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1503},{"i":1939,"cid":"24CI0022","pid":"P00838345LZ","t":"Construction of Flood Control Structure along Sapangbalen Creek, Barangays Santo Niño to Santa Maria, Magalang, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":72368655.53,"abc":72373866.69,"fy":"2024","sd":"02/16/2024","cd":"2024-08-22","lat":15.22588,"lon":120.6507,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Sapangbalen","wn":"Sapang Balen","wd":9.62,"wp":[15.31113,120.63319],"wst":"matched","br":"Santo Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1504},{"i":1940,"cid":"23CI0053","pid":"P00740623LZ","t":"Construction of Drainage at Brgy. San Miguel to Brgy. San Isidro, Magalang, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MICKAJETTE CONSTRUCTION AND TRADING","c":39189328.1,"abc":39191360.09,"fy":"2023","sd":"03/24/2023","cd":"2023-08-20","lat":15.225878,"lon":120.650744,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1505},{"i":1941,"cid":"23A00161","pid":"P00726368LZ","t":"Construction of Flood Mitigation Structure along Agno and Allied Rivers, Samon, Sta. Maria, Pangasinan","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"SANTA MARIA (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":48249667.67,"abc":48250000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-06-15","lat":15.926837,"lon":120.650855,"sm":1393,"fm":1393,"tm":1393,"am":1393,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1506},{"i":1942,"cid":"23CI0134","pid":"P00740353LZ","t":"Construction of Groundsill along Quitangil Creek, Mabalacat-Magalang, Pampanga","w":"Construction of Groundsill","rg":"Region III","pv":"PAMPANGA","mu":"MABALACAT CITY (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":72350622.14,"abc":72356515.73,"fy":"2023","sd":"05/16/2023","cd":"2023-11-21","lat":15.191569,"lon":120.651379,"sm":840,"fm":840,"tm":null,"am":860,"md":2.02,"ls":"adjacent","ww":"Quitangil","wn":"Quitangil River","wd":3.59,"wp":[15.22346,120.65769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.59,"text":"The title names Quitangil, which OpenStreetMap maps through the stated municipality, but the pin is 3.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":333},{"i":1943,"cid":"21PA0244","pid":"P00561520LZ","t":"Construction of Patiao Flood Control, Sta. 67+300 - 67+800, Peñarrubia, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Peñarrubia","deo":"Abra District Engineering Office","co":"A.D. MARRERO GENERAL CONSTRUCTION","c":29397162.42,"abc":29400000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-09-19","lat":17.54753,"lon":120.651686,"sm":1120,"fm":null,"tm":1120,"am":1120,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1507},{"i":1944,"cid":"24CK0065","pid":"P00838422LZ","t":"Construction of Slope Protection Structure, Sacobia - Bamban River, Left Bank, Barangay San Francisco, Package A, Sta. 10+912.00 to Sta. 11+447.80, Concepcion, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP. / ERA CONSTRUCTION INC.","c":96417364.16,"abc":96499561.09,"fy":"2024","sd":"02/20/2024","cd":"2024-08-21","lat":15.30192,"lon":120.65172,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Bamban","wn":"Bambang Creek","wd":35.41,"wp":[15.02858,120.82294],"wst":"matched","br":"San Francisco","len":535.8,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1508},{"i":1945,"cid":"23AI0087","pid":"P00742284LZ","t":"Construction of Flood Mitigation Structure along Cabalancian River, Brgy. Balincanaway-Bakit-Bakit, Rosales, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"W.J.P. CONSTRUCTION AND SUPPLY","c":19570622.22,"abc":19600000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-05-22","lat":15.884409,"lon":120.651999,"sm":1215,"fm":1215,"tm":1215,"am":1215,"md":0.0,"ls":"inside","ww":"Cabalancian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balincanaway-Bakit-Bakit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1509},{"i":1946,"cid":"22PA0095","pid":"P00632780LZ","t":"Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"PEÑARRUBIA (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49497153.28,"abc":48999933.68,"fy":"2022","sd":"05/24/2022","cd":"2023-01-20","lat":17.543933,"lon":120.652712,"sm":1120,"fm":1120,"tm":1120,"am":1120,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Namarabar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":730},{"i":1947,"cid":"24EB0064","pid":"P00824735LZ","t":"Construction of Flood Control Structures along Mamara River, Bagong Silang Section, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":38026008.01,"abc":39200000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-21","lat":13.346354,"lon":120.653411,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":"Mamara","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1510},{"i":1948,"cid":"24CG0079","pid":"P00844757LZ","t":"Construction of Slope Protection at Maimpis-Malpitic Creek, City of San Fernando, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":46549941.34,"abc":49000000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-09-18","lat":15.076355,"lon":120.654457,"sm":415,"fm":415,"tm":415,"am":415,"md":0.0,"ls":"inside","ww":"Maimpis-Malpitic","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1511},{"i":1949,"cid":"24CG0100","pid":"P00824704LZ","t":"Construction/Rehabilitation of Slope Protection along Anao - San Pablo Creek, Mexico, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MEXICO (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION / MAYFLOWER CONSTRUCTION AND DEVELOPMENT CORPORATION","c":46451991.76,"abc":49000000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-10-05","lat":15.093848,"lon":120.654645,"sm":970,"fm":970,"tm":970,"am":415,"md":0.44,"ls":"boundary","ww":"San Pablo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1512},{"i":1950,"cid":"23PA0051","pid":"P00740310LZ","t":"Construction of Tayum Flood Control Structure, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":96497132.0,"abc":96499975.99,"fy":"2023","sd":"04/05/2023","cd":"2023-06-28","lat":17.631107,"lon":120.655179,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1513},{"i":1951,"cid":"22CG0025","pid":"P00631237LZ","t":"Construction of Drainage System at Sta. Ines and Cabetican, Bacolor, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"MAYFLOWER CONSTRUCTION AND DEVELOPMENT CORPORATION","c":27753512.0,"abc":29400000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-03","lat":14.994908,"lon":120.65525,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1514},{"i":1952,"cid":"24PE0010","pid":"P00821130LZ","t":"Construction of Flood Mitigation Structure along Agno River, Section 11 (Lower Ambalanga), Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES / TSAI SHEN CONSTRUCTION","c":59820000.0,"abc":59830000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-11-25","lat":16.368056,"lon":120.655278,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":6.87,"wp":[16.36381,120.71941],"wst":"matched","br":null,"len":null,"ph":"Section 11","dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":6.87,"text":"The title names Agno, which OpenStreetMap maps through the stated municipality, but the pin is 6.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":286},{"i":1953,"cid":"22AI0095","pid":"P00620968LZ","t":"Construction of Flood Control Structure along Banila River, Brgy. Bakit-Bakit, Rosales, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":28960229.12,"abc":29400000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-09-05","lat":15.8961,"lon":120.65533,"sm":1215,"fm":1215,"tm":1215,"am":1215,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":9.83,"wp":[15.91668,120.74464],"wst":"matched","br":"Bakit-Bakit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1515},{"i":1954,"cid":"22EB0087","pid":"P00637085LZ","t":"Construction of Flood Control Structure, Brgy. Cabacao, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JUAN ANTONIO CONSTRUCTION","c":7133814.55,"abc":9900000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-08-15","lat":13.336723,"lon":120.655633,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabacao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1516},{"i":1955,"cid":"22AI0146","pid":"P00621615LZ","t":"Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 4)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":43155998.93,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-04-28","lat":15.8969,"lon":120.6558,"sm":140,"fm":140,"tm":null,"am":1215,"md":0.51,"ls":"boundary","ww":"Banila","wn":"Banila River","wd":9.77,"wp":[15.91668,120.74464],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[1960,1964],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AI0146 to 22AI0148) cover the same site, together worth PHP 131,580,774.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":575},{"i":1956,"cid":"23CK0036","pid":"P00737484LZ","t":"Construction of Drainage Canal, Barangay San Nicolas Poblacion, Concepcion, Tarlac","w":"Construction of Drainage Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RA3N CONSTRUCTION AND SUPPLY","c":4848693.6,"abc":4949840.78,"fy":"2023","sd":"01/31/2023","cd":"2023-03-31","lat":15.325592,"lon":120.656056,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1517},{"i":1957,"cid":"22CK0079","pid":"P00637024LZ","t":"Construction of Slope Protection Structure, Sacobia-Bamban River, Left Bank, Brgy. Sta. Rita, Concepcion, Tarlac","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":93168832.14,"abc":96499329.29,"fy":"2022","sd":"03/26/2022","cd":"2022-12-05","lat":15.30401,"lon":120.65625,"sm":448,"fm":448,"tm":448,"am":448,"md":0.0,"ls":"inside","ww":"Sacobia-Bamban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Rita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1518},{"i":1958,"cid":"24CG0071","pid":"P00844758LZ","t":"Construction of Slope Protection at Sapang Balen (Calulut Portion), City of San Fernando, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"R.G. DIAZ  BUILDERS & TRADING","c":46451987.21,"abc":49000000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-09-14","lat":15.08745,"lon":120.656396,"sm":415,"fm":415,"tm":415,"am":415,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1519},{"i":1959,"cid":"22CG0036","pid":"P00631244LZ","t":"Rehabilitation of San Isidro-Pigulut Magliman Creek, Bacolor, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"N.T. TULABUT CONSTRUCTION AND SUPPLY","c":27871185.41,"abc":29400000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-07-22","lat":15.030687,"lon":120.6584,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":"San Isidro-Pigulut Magliman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1520},{"i":1960,"cid":"22AI0147","pid":"P00621614LZ","t":"Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 3)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":43033678.5,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-04-28","lat":15.8975,"lon":120.65856,"sm":140,"fm":140,"tm":null,"am":1215,"md":0.21,"ls":"boundary","ww":"Banila","wn":"Banila River","wd":9.46,"wp":[15.91668,120.74464],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[1955,1964],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AI0146 to 22AI0148) cover the same site, together worth PHP 131,580,774.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":576},{"i":1961,"cid":"24PA0025","pid":"P00821144LZ","t":"Construction of Poblacion-Deet Flood Control along Abra River, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / TWINFORMERS CONSTRUCTION SERVICES","c":144710474.2,"abc":144750000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-16","lat":17.632,"lon":120.65858,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":0.55,"wp":[17.627,120.65843],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1521},{"i":1962,"cid":"22A00273","pid":"P00621557LZ","t":"Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Sinabaan, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96499962.97,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-06","lat":17.901449,"lon":120.659,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1966,1968,1971,1973,1974,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":731},{"i":1963,"cid":"22AB0118","pid":"P00640490LZ","t":"Construction of Flood Control and River Control Structure along Magalis River (Bongo River Tributary) Upstream of Malamin Bridge, Brgy. Lorenzo, Brgy. Catagtaguen, Banna, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANNA (ESPIRITU) (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-12-16","lat":17.97072,"lon":120.65926,"sm":154,"fm":154,"tm":154,"am":154,"md":0.0,"ls":"inside","ww":"Magalis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1522},{"i":1964,"cid":"22AI0148","pid":"P00621613LZ","t":"Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 2)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":45391096.08,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-10-25","lat":15.8992,"lon":120.66056,"sm":140,"fm":140,"tm":null,"am":1215,"md":0.03,"ls":"boundary","ww":"Banila","wn":"Banila River","wd":9.21,"wp":[15.91668,120.74464],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[1955,1960],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22AI0146 to 22AI0148) cover the same site, together worth PHP 131,580,774.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":577},{"i":1965,"cid":"24CG0090","pid":"P00844760LZ","t":"Construction of Slope Protection Calulut Creek, City of San Fernando, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"CHOLO CONSTRUCTION AND TRADING","c":45549879.24,"abc":49000000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-09-28","lat":15.091748,"lon":120.660881,"sm":415,"fm":415,"tm":415,"am":415,"md":0.0,"ls":"inside","ww":"Calulut","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1523},{"i":1966,"cid":"22A00253","pid":"P00621559LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 1, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96499986.02,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-06","lat":17.894878,"lon":120.661547,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1968,1971,1973,1974,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":732},{"i":1967,"cid":"23CI0110","pid":"P00740355LZ","t":"Construction of Dike with Slope Protection and Groundsill along Quitangil Creek (Leftside), Barangays San Miguel-Turu, Magalang, Pampanga","w":"Construction of Dike","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"ALPIZ CONSTRUCTION & DEVELOPMENT CORPORATION / D.R. ROBLES CONSTRUCTION","c":72349038.58,"abc":72374572.82,"fy":"2023","sd":"05/08/2023","cd":"2023-11-03","lat":15.223341,"lon":120.661654,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.01,"wp":[15.22342,120.66166],"wst":"matched","br":"San Miguel-Turu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1524},{"i":1968,"cid":"22A00255","pid":"P00621560LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96499995.44,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-11","lat":17.901929,"lon":120.661778,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1971,1973,1974,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":733},{"i":1969,"cid":"21PF0021","pid":"P00525914LZ","t":"Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (R.S.), Sta. 0+187 - Sta. 0+292 (L.S.), Kibungan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Kibungan","deo":"Benguet 2nd District Engineering Office","co":"AKIP CONSTRUCTION AND ENTERPRISE","c":8704178.48,"abc":9800000.0,"fy":"2021","sd":"01/18/2022","cd":"2022-09-02","lat":16.72285,"lon":120.662128,"sm":711,"fm":null,"tm":711,"am":711,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":225.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1525},{"i":1970,"cid":"24AA0209","pid":"P00838489LZ","t":"Construction of Lined Canal, Barangay 53 Rioeng, Laoag City, Ilocos Norte","w":"Construction of Drainage Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"LAOAG CITY (CAPITAL) (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KRB CONSTRUCTION","c":4899838.8,"abc":4899839.02,"fy":"2024","sd":"03/01/2024","cd":"2024-04-22","lat":18.177705,"lon":120.662151,"sm":751,"fm":751,"tm":751,"am":1429,"md":0.76,"ls":"boundary","ww":"Lined","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"53 Rioeng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1526},{"i":1971,"cid":"22A00252","pid":"P00621553LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Boli, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96499990.96,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-10","lat":17.897873,"lon":120.662293,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1973,1974,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":734},{"i":1972,"cid":"23PA0048","pid":"P00740306LZ","t":"Construction of Deet-Pudok Flood Control Structure, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144747542.0,"abc":146999974.5,"fy":"2023","sd":"04/05/2023","cd":"2023-06-29","lat":17.632575,"lon":120.662365,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1527},{"i":1973,"cid":"22A00266","pid":"P00621590LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":43424813.95,"abc":44100000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.89977,"lon":120.66241,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1974,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":951},{"i":1974,"cid":"22A00256","pid":"P00621555LZ","t":"Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499983.03,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-11","lat":17.907184,"lon":120.662595,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.02,"ls":"boundary","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1975,1977,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":735},{"i":1975,"cid":"22A00264","pid":"P00621588LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Boli 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":24124998.35,"abc":24500000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.894935,"lon":120.662685,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1977,1978,1979,1980,1982,1984],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":984},{"i":1976,"cid":"22AI0137","pid":"P00621612LZ","t":"Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 1)","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":45513250.28,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-10-25","lat":15.9014,"lon":120.6628,"sm":140,"fm":140,"tm":null,"am":140,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":8.93,"wp":[15.91668,120.74464],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1528},{"i":1977,"cid":"22A00259","pid":"P00621561LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499985.94,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-11","lat":17.905868,"lon":120.6631,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1978,1979,1980,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":736},{"i":1978,"cid":"22A00265","pid":"P00621589LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 2, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":29914933.06,"abc":30380000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-04-12","lat":17.891924,"lon":120.663131,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1977,1979,1980,1982,1984],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":985},{"i":1979,"cid":"22A00267","pid":"P00621591LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan 3, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":33774845.17,"abc":34300000.0,"fy":"2022","sd":"11/03/2022","cd":"2023-03-15","lat":17.902399,"lon":120.663255,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1977,1978,1980,1982,1984],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":952},{"i":1980,"cid":"22A00257","pid":"P00621556LZ","t":"Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499966.26,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-11","lat":17.9104,"lon":120.6633,"sm":1027,"fm":1027,"tm":1027,"am":154,"md":0.05,"ls":"boundary","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1977,1978,1979,1982,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":737},{"i":1981,"cid":"23CG0001","pid":"P00726174LZ","t":"Construction of Slope Protection at Pampanga Delta Dikes along Left Bank, Consuelo (Phase I), Macabebe, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"MACABEBE (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":47284732.0,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-11-05","lat":14.789068,"lon":120.663396,"sm":848,"fm":848,"tm":848,"am":848,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1529},{"i":1982,"cid":"22A00254","pid":"P00621554LZ","t":"Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96499933.26,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-10","lat":17.903461,"lon":120.6637,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1977,1978,1979,1980,1984],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":738},{"i":1983,"cid":"24EB0062","pid":"P00824733LZ","t":"Construction of Flood Control Structures along Mamburao River, Cabacao Section, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":38959921.61,"abc":39200000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-08-21","lat":13.334777,"lon":120.663848,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":"Mamburao","wn":"Mamburao River","wd":0.46,"wp":[13.3321,120.66711],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1530},{"i":1984,"cid":"22A00258","pid":"P00621562LZ","t":"Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan, Nueva Era, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"NUEVA ERA (ILOCOS NORTE)","deo":"Ilocos Norte 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499973.59,"abc":96500000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-10","lat":17.9093,"lon":120.665,"sm":1027,"fm":1027,"tm":1027,"am":1027,"md":0.0,"ls":"inside","ww":"Bongo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[1962,1966,1968,1971,1973,1974,1975,1977,1978,1979,1980,1982],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Poblacion (2022), totalling PHP 999,739,368.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":739},{"i":1985,"cid":"22PA0078","pid":"P00639321LZ","t":"Construction of Flood Control Structure, Canan - Poblacion, Barangay Canan and Poblacion, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96497900.0,"abc":96500000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-01-24","lat":17.656385,"lon":120.665814,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1531},{"i":1986,"cid":"24AI0072","pid":"P00845914LZ","t":"Construction of Slope Protection Structure along Banila and Allied River, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":49446862.94,"abc":49500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-05-15","lat":15.901944,"lon":120.666472,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Allied","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[1822,1839],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24AI0072 to 24AI0075) cover the same site, together worth PHP 148,332,914.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":479},{"i":1987,"cid":"24AI0146","pid":"P00843202LZ","t":"Construction of Flood Mitigation Structure along Cabalancian River, Package B, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"JHI CONSTRUCTION & SUPPLY","c":96389680.11,"abc":96500000.0,"fy":"2024","sd":"04/16/2024","cd":"2024-06-30","lat":15.897344,"lon":120.666719,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Cabalancian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1532},{"i":1988,"cid":"24AI0065","pid":"P00824663LZ","t":"Construction of Flood Mitigation Structure along Cabalancian River, Kita-Kita, Balungao, Pangasinan, Phase II","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"JHI CONSTRUCTION & SUPPLY","c":39152848.87,"abc":39200000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-06-30","lat":15.899031,"lon":120.666975,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Cabalancian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1533},{"i":1989,"cid":"22CG0067","pid":"P00631235LZ","t":"Construction of Drainage System at San Isidro, Macabacle and Magliman, Bacolor, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":37827625.19,"abc":39200000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-22","lat":15.03202,"lon":120.667164,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1534},{"i":1990,"cid":"24CG0037","pid":"P00844756LZ","t":"Construction of Flood Control Structure along Cabalantian Creek (Phase II), Bacolor, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":32482100.0,"abc":34300000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-08-05","lat":15.006243,"lon":120.667544,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":"Cabalantian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1535},{"i":1991,"cid":"24E00015","pid":"P00821357LZ","t":"Construction of Flood Control Structure along Abra de Ilog River, Cabacao Section, Abra de Ilog, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"ABRA DE ILOG (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":241234859.2,"abc":241250000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-11-25","lat":13.332952,"lon":120.667783,"sm":1,"fm":1,"tm":1,"am":1,"md":0.0,"ls":"inside","ww":"Abra de Ilog","wn":"Abra de Ilog River","wd":9.11,"wp":[13.40699,120.70461],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":9.11,"text":"The title names Abra de Ilog, which OpenStreetMap maps through the stated municipality, but the pin is 9.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":195},{"i":1992,"cid":"22PE0002","pid":"P00620999LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11b (Batuang), Virac, Itogon, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"ITOGON (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"GSIXTY CONSTRUCTION SERVICES","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-08-12","lat":16.365212,"lon":120.667927,"sm":655,"fm":655,"tm":655,"am":655,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":5.5,"wp":[16.36381,120.71941],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.5,"text":"The title names Agno, which OpenStreetMap maps through the stated municipality, but the pin is 5.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":378},{"i":1993,"cid":"24PA0042","pid":"P00838338LZ","t":"Construction of Pudok Flood Control (Phase 2), Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-19","lat":17.6351,"lon":120.66805,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1536},{"i":1994,"cid":"22PA0101","pid":"P00632762LZ","t":"Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"TAYUM (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":49497500.0,"abc":48999957.44,"fy":"2022","sd":"05/31/2022","cd":"2022-09-09","lat":17.619183,"lon":120.66812,"sm":1559,"fm":1559,"tm":1559,"am":1559,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Deet","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":740},{"i":1995,"cid":"24AI0064","pid":"P00824657LZ","t":"Construction of Flood Mitigation Structure along Cabalancian River, Kita-Kita, Balungao, Pangasinan, Phase I","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":48944869.3,"abc":49000000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-06-30","lat":15.909125,"lon":120.668281,"sm":140,"fm":140,"tm":140,"am":140,"md":0.0,"ls":"inside","ww":"Cabalancian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1537},{"i":1996,"cid":"22PA0076","pid":"P00620985LZ","t":"Construction of Flood Control Structure along Abra River, Sta. 2+400 - Sta. 3+100, Canan, La Paz, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LA PAZ (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48997900.0,"abc":48999972.12,"fy":"2022","sd":"03/16/2022","cd":"2022-10-22","lat":17.657794,"lon":120.668542,"sm":723,"fm":723,"tm":723,"am":723,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":3.24,"wp":[17.63097,120.6808],"wst":"matched","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.24,"text":"The title names Abra, which OpenStreetMap maps through the stated municipality, but the pin is 3.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":365},{"i":1997,"cid":"22PF0049","pid":"P00639458LZ","t":"Construction of Flood Control Structure along Ambalideng River (Wanga Ricefield Area) at Poblacion, Kibungan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KIBUNGAN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/17/2022","cd":"2022-11-18","lat":16.705479,"lon":120.668598,"sm":711,"fm":711,"tm":711,"am":711,"md":0.0,"ls":"inside","ww":"Ambalideng","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1538},{"i":1998,"cid":"22CG0027","pid":"P00631232LZ","t":"Construction of Drainage System at Cabalantian and San Vicente, Bacolor, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"BACOLOR (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":37239841.0,"abc":39200000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-07","lat":15.006959,"lon":120.669231,"sm":96,"fm":96,"tm":96,"am":96,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1539},{"i":1999,"cid":"24CI0007","pid":"P00838361LZ","t":"Construction of Reinforced Concrete Slope Protection Structure along Quitangil Creek, Barangay San Pedro, Magalang, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"MAGALANG (PAMPANGA)","deo":"Pampanga 3rd District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":77186878.15,"abc":77191006.28,"fy":"2024","sd":"02/26/2024","cd":"2024-07-22","lat":15.22811,"lon":120.6697,"sm":860,"fm":860,"tm":860,"am":860,"md":0.0,"ls":"inside","ww":"Quitangil","wn":"Quitangil River","wd":0.02,"wp":[15.22822,120.66959],"wst":"matched","br":"San Pedro","len":null,"ph":null,"dup":[1000],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 126,162,376.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":801},{"i":2000,"cid":"23PF0012","pid":"P00726409LZ","t":"Construction of Flood Mitigation Structure along Agno River, Baoknit Section, Sta. 9 + 945 - Sta. 10 + 555 (L.S), Sta. 9 + 928 - Sta. 10 + 524 (R.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / JAN-REAL CONSTRUCTION SERVICES","c":72324030.27,"abc":72375000.0,"fy":"2023","sd":"05/22/2023","cd":"2023-12-22","lat":16.805344,"lon":120.837889,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.0,"wp":[16.80535,120.83786],"wst":"matched","br":null,"len":1206.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1540},{"i":2001,"cid":"23CC0266","pid":"P00742323LZ","t":"Construction of Drainage Canal, Brgy. Dampol I, Pulilan, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BIG BEN CONSTRUCTION","c":19798438.81,"abc":19799956.98,"fy":"2023","sd":"03/27/2023","cd":"2023-11-21","lat":14.903384,"lon":120.838104,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampol I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1541},{"i":2002,"cid":"22EB0031","pid":"P00621104LZ","t":"Construction of Flood Control Structure Mompong River, Malisbong Section, Sta. 0+000 - Sta. 0+377, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":32557644.6,"abc":44100000.0,"fy":"2022","sd":"05/30/2022","cd":"2023-07-15","lat":12.783275,"lon":120.838186,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Mompong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":377.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1542},{"i":2003,"cid":"24PF0020","pid":"P00821131LZ","t":"Construction of Flood Mitigation Structure along Agno River, Tin-apan Section, Sta. 0+058 - Sta. 0+650 (B.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"DJY CONSTRUCTION / NORJOHN CONSTRUCTION","c":67462363.43,"abc":67550000.0,"fy":"2024","sd":"05/15/2024","cd":"2024-07-25","lat":16.803992,"lon":120.838374,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.08,"wp":[16.80426,120.83773],"wst":"matched","br":null,"len":592.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1543},{"i":2004,"cid":"23CG0134","pid":"P00726893LZ","t":"Construction of Slope Protection Works at Malasik River, Phase II (San Agustin Section) Barangay San Agustin, Candaba, Pampanga.","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91192478.11,"abc":96500000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-02-03","lat":15.088653,"lon":120.838665,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Agustin","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1544},{"i":2005,"cid":"22PE0071","pid":"P00639448LZ","t":"Construction of Pet-Okan Naybaliw Creek Flood Control, Duacan, Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"AROBOAN CONSTRUCTION AND SUPPLY","c":9793460.31,"abc":9800000.0,"fy":"2022","sd":"07/26/2022","cd":"2023-01-24","lat":16.619463,"lon":120.839806,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":"Pet-Okan Naybaliw","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1545},{"i":2006,"cid":"23CC0187","pid":"P00740596LZ","t":"Construction of Drainage Structure, Pulilan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":29398745.78,"abc":29399023.84,"fy":"2023","sd":"03/21/2023","cd":"2023-10-09","lat":14.955271,"lon":120.840008,"sm":1182,"fm":1182,"tm":1182,"am":67,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1546},{"i":2007,"cid":"23E00031","pid":"P00736044LZ","t":"Construction of Ilvita Riverbank Protection Works along Amnay River, Sablayan, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":217122319.5,"abc":217124999.6,"fy":"2023","sd":"02/11/2023","cd":"2024-02-05","lat":12.7904,"lon":120.8407,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Ilvita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1547},{"i":2008,"cid":"23CC0008","pid":"P00736613LZ","t":"Construction of Flood Mitigation Structures along Barangay Matimbo, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":48999995.78,"abc":48999842.99,"fy":"2023","sd":"02/06/2023","cd":"2023-07-03","lat":14.813975,"lon":120.841161,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matimbo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1548},{"i":2009,"cid":"22EB0086","pid":"P00637084LZ","t":"Construction of Flood Control Structure, Sitio Baclaran, Brgy. Pinagturilan, Sta. Cruz, Occiental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"DAYBREAK ENTERPRISES - ENGINEERING & CONSTRUCTION","c":6085928.06,"abc":9900000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-07-25","lat":12.988758,"lon":120.841529,"sm":1380,"fm":1380,"tm":1380,"am":1380,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagturilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1549},{"i":2010,"cid":"23E00016","pid":"P00725866LZ","t":"Construction of Bank Protection Structure with Road Dike along Pinpin River, Sitio Bagong Sikat, Barangay Pinagtuliran, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96497025.69,"abc":96499999.27,"fy":"2023","sd":"02/11/2023","cd":"2023-11-10","lat":12.989,"lon":120.8425,"sm":1380,"fm":1380,"tm":null,"am":1380,"md":0.0,"ls":"inside","ww":"Pinpin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pinagtuliran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1550},{"i":2011,"cid":"23PF0013","pid":"P00726408LZ","t":"Construction of Flood Mitigation Structure along Agno River, Calamagan Section, Sta. 11 + 008 - Sta. 11 + 700 (R.S), Sta. 11 + 008 - Sta. 11 + 713 (L.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"JYP GENERAL CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-10-23","lat":16.811728,"lon":120.842926,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.01,"wp":[16.81174,120.84282],"wst":"matched","br":null,"len":1397.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1551},{"i":2012,"cid":"22PE0066","pid":"P00639447LZ","t":"Construction of Flood Control Structure at Sitio Sokong, Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"AROBOAN CONSTRUCTION AND SUPPLY","c":9679857.68,"abc":9800000.0,"fy":"2022","sd":"07/19/2022","cd":"2022-11-21","lat":16.594848,"lon":120.845282,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1552},{"i":2013,"cid":"23CC0239","pid":"P00742135LZ","t":"Construction (Improvement) of Slope Protection Structure and Waterways at Barangay Mambog, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":74249916.8,"abc":74249746.88,"fy":"2023","sd":"03/28/2023","cd":"2023-12-07","lat":14.81152,"lon":120.846022,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1553},{"i":2014,"cid":"24CC0295","pid":"P00845984LZ","t":"Bank Improvement and Rehabilitation of Waterways, Brgy. Mambog, Malolos City, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":74247158.51,"abc":74249936.6,"fy":"2024","sd":"04/16/2024","cd":"2024-12-11","lat":14.807432,"lon":120.846678,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1554},{"i":2015,"cid":"24CC0197","pid":"P00823363LZ","t":"Construction/mprovement of Flood Mitigation Structure at Mambog, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77180485.93,"abc":77199808.55,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.809175,"lon":120.846748,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1555},{"i":2016,"cid":"24CC0015","pid":"P00838402LZ","t":"Construction of Riverbank Protection Structure at Barangay Mambog, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199984.52,"abc":77199984.38,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.808048,"lon":120.847795,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1556},{"i":2017,"cid":"24DB0022","pid":"P00839598LZ","t":"Construction of Flood Mitigation Structure, Calaca, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF CALACA (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"FILCAN UNITED CONSTRUCTION & GENERAL MERCHANDISE CORP.","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-07","lat":14.13868,"lon":120.848324,"sm":292,"fm":292,"tm":292,"am":32,"md":9.08,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":9.08,"text":"The pin is 9.1 km outside Calaca, Batangas, the nearest municipality the record claims. It falls in Alfonso, Cavite.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":319},{"i":2018,"cid":"22CE0029","pid":"P00620530LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Pantoc, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":45080000.0,"abc":45080000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-08-02","lat":15.529621,"lon":120.84856,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.52991,120.84833],"wst":"matched","br":"Pantoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1557},{"i":2019,"cid":"23CE0038","pid":"P00725704LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. Pantoc to Brgy. Bibiclat, Aliaga, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96496000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-08-01","lat":15.529394,"lon":120.848595,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.06,"wp":[15.52984,120.84824],"wst":"matched","br":"Pantoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1558},{"i":2020,"cid":"23DF0163","pid":"P00727162LZ","t":"Construction of Road Dike along Timalan River Barangay San Agustin, Phase IV, Trece Martires City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48999623.34,"abc":49000000.0,"fy":"2023","sd":"08/06/2023","cd":"2024-03-17","lat":14.289758,"lon":120.850311,"sm":1583,"fm":1548,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.67,"wp":[14.28959,120.84406],"wst":"matched","br":"San Agustin","len":null,"ph":"Phase IV","dup":[],"run":[2036,2032,2026],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DF0160 to 23DF0163) cover the same site, together worth PHP 195,997,396.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":508},{"i":2021,"cid":"24CE0018","pid":"P00820275LZ","t":"Rehabilitation of Dike along Talavera River, Barangay San Andres II, Quezon, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / BRYAN PAUL P. PACHECO CONST. CORP.","c":95533042.22,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.532509,"lon":120.850402,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.05,"wp":[15.5321,120.85063],"wst":"matched","br":"San Andres II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1559},{"i":2022,"cid":"24CC0079","pid":"P00821268LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Lumang Bayan, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96499699.7,"abc":96499925.68,"fy":"2024","sd":"02/07/2024","cd":"2024-10-30","lat":14.897284,"lon":120.850561,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.89791,120.85014],"wst":"matched","br":"Lumang Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1560},{"i":2023,"cid":"22DF0051","pid":"P00620572LZ","t":"Construction of Road Dike along Timalan River, Brgy. Cabuco, Phase IV, Trece Martires City, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"HAUSLAND CONSTRUCTION","c":46542408.71,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-05","lat":14.288591,"lon":120.85095,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.72,"wp":[14.28806,120.84427],"wst":"matched","br":"Cabuco","len":null,"ph":"Phase IV","dup":[],"run":[2035,2031,2030],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22DF0048 to 22DF0051) cover the same site, together worth PHP 190,832,928.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":545},{"i":2024,"cid":"24CC0383","pid":"P00825074LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Lumang Bayan Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199672.06,"abc":77199982.7,"fy":"2024","sd":"04/23/2024","cd":"2024-11-05","lat":14.897578,"lon":120.851226,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.09,"wp":[14.89832,120.85083],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2733,2648],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0381 to 24CC0384) cover the same site, together worth PHP 231,597,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":396},{"i":2025,"cid":"22PA0036","pid":"P00632768LZ","t":"Construction of Madao - Bulbulala Flood Control, Barangay Bulbulala, Licuan-Baay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LICUAN-BAAY (LICUAN) (ABRA)","deo":"Abra District Engineering Office","co":"A.D. MARRERO GENERAL CONSTRUCTION","c":49497000.0,"abc":48999965.97,"fy":"2022","sd":"02/09/2022","cd":"2022-07-12","lat":17.545846,"lon":120.8513,"sm":786,"fm":786,"tm":786,"am":786,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulbulala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01014,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":741},{"i":2026,"cid":"23DF0162","pid":"P00727161LZ","t":"Construction of Road Dike along Timalan River Barangay San Agustin, Phase III, Trece Martires City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48999203.03,"abc":49000000.0,"fy":"2023","sd":"08/06/2023","cd":"2024-03-17","lat":14.288306,"lon":120.851511,"sm":1583,"fm":1548,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.78,"wp":[14.28735,120.84433],"wst":"matched","br":"San Agustin","len":null,"ph":"Phase III","dup":[],"run":[2036,2032,2020],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DF0160 to 23DF0163) cover the same site, together worth PHP 195,997,396.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":509},{"i":2027,"cid":"23CC0277","pid":"P00727277LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Lumang Bayan Plaridel, Bulacan (K019+931 to K020+231)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":72374590.51,"abc":72374751.31,"fy":"2023","sd":"03/14/2023","cd":"2023-09-19","lat":14.898494,"lon":120.85225,"sm":1152,"fm":1152,"tm":248,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.89878,120.85217],"wst":"matched","br":"Lumang Bayan Plaridel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.71,"text":"The record contradicts itself: the municipality field and the pin point to Plaridel, Bulacan, but the title names Bulacan, Bulacan, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":492},{"i":2028,"cid":"23DF0094","pid":"P00742420LZ","t":"Rehabilatation Improvement of Drainage System along Tanza Diversion Road & Novelita Naic Tagaytay Road & Tanza Bridge Daang Amaya Junstion Tanza Cavite","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"J.S. GENERAL CONTRACTOR","c":7101451.84,"abc":7177500.0,"fy":"2023","sd":"04/06/2023","cd":"2023-07-14","lat":14.392536,"lon":120.852336,"sm":1548,"fm":1548,"tm":null,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1561},{"i":2029,"cid":"22DF0014","pid":"P00620871LZ","t":"Construction of Revetment along Ilang - Ilang River, Brgy. Tapia Section, Phase VI, Gen. Trias, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"BAQPRINCE CONSTRUCTION AND TRADING CORP.","c":81832000.0,"abc":81832000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-12","lat":14.36291,"lon":120.881856,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tapia Section","len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1562},{"i":2030,"cid":"22DF0050","pid":"P00620571LZ","t":"Construction of Road Dike along Timalan River, Brgy. Cabuco, Phase III, Trece Martires City, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"BAQPRINCE CONSTRUCTION AND TRADING CORP.","c":46533152.26,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-05","lat":14.287619,"lon":120.852865,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.92,"wp":[14.28735,120.84433],"wst":"matched","br":"Cabuco","len":null,"ph":"Phase III","dup":[],"run":[2035,2031,2023],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22DF0048 to 22DF0051) cover the same site, together worth PHP 190,832,928.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":546},{"i":2031,"cid":"22DF0049","pid":"P00620570LZ","t":"Construction of Road Dike along Timalan River, Brgy. Cabuco, Phase II, Trece Martires City, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48887751.08,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-05","lat":14.28396,"lon":120.852907,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.86,"wp":[14.27866,120.84706],"wst":"matched","br":"Cabuco","len":null,"ph":"Phase II","dup":[],"run":[2035,2030,2023],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22DF0048 to 22DF0051) cover the same site, together worth PHP 190,832,928.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":510},{"i":2032,"cid":"23DF0161","pid":"P00727160LZ","t":"Construction of Road Dike along Timalan River Barangay San Agustin, Phase II, Trece Martires City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48999307.5,"abc":49000000.0,"fy":"2023","sd":"08/07/2023","cd":"2024-03-18","lat":14.287272,"lon":120.853253,"sm":1583,"fm":1548,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.96,"wp":[14.28735,120.84433],"wst":"matched","br":"San Agustin","len":null,"ph":"Phase II","dup":[],"run":[2036,2026,2020],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DF0160 to 23DF0163) cover the same site, together worth PHP 195,997,396.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":511},{"i":2033,"cid":"25CE0056","pid":"P00921035LZ","t":"Construction of Slope Protection Structure, Calinat Dam at PRIS SDC, Science City of Muñoz, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SCIENCE CITY OF MUÑOZ (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":9701851.92,"abc":9800000.0,"fy":"2025","sd":"02/11/2025","cd":"2025-04-07","lat":15.676996,"lon":120.853281,"sm":1431,"fm":1431,"tm":1431,"am":1431,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1563},{"i":2034,"cid":"24CE0035","pid":"P00820827LZ","t":"Construction of PRIS SDC Slope Protection at Calinat Dam, Science City of Munoz, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SCIENCE CITY OF MUÑOZ (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":19403906.2,"abc":19600000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-07-30","lat":15.677236,"lon":120.853451,"sm":1431,"fm":1431,"tm":1431,"am":1431,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1564},{"i":2035,"cid":"22DF0048","pid":"P00620569LZ","t":"Construction of Road Dike along Timalan River, Brgy. Cabuco, Phase I, Trece Martires City, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48869615.47,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-05","lat":14.28397,"lon":120.853783,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.93,"wp":[14.27866,120.84706],"wst":"matched","br":"Cabuco","len":null,"ph":"Phase I","dup":[],"run":[2031,2030,2023],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22DF0048 to 22DF0051) cover the same site, together worth PHP 190,832,928.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":512},{"i":2036,"cid":"23DF0160","pid":"P00727163LZ","t":"Construction of Road Dike along Timalan River Barangay San Agustin, Phase I, Trece Martires City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":48999261.63,"abc":49000000.0,"fy":"2023","sd":"08/07/2023","cd":"2024-03-18","lat":14.28395,"lon":120.853783,"sm":1583,"fm":1548,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Timalan","wn":"Timalan River","wd":0.93,"wp":[14.27866,120.84706],"wst":"matched","br":"San Agustin","len":null,"ph":"Phase I","dup":[],"run":[2032,2026,2020],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DF0160 to 23DF0163) cover the same site, together worth PHP 195,997,396.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":513},{"i":2037,"cid":"23CC0247","pid":"P00742152LZ","t":"Construction of Flood Mitigation Structures along Bgry. Tikay, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":59398979.93,"abc":59399786.07,"fy":"2023","sd":"03/28/2023","cd":"2023-11-21","lat":14.843616,"lon":120.854154,"sm":401,"fm":401,"tm":401,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1565},{"i":2038,"cid":"24CC0468","pid":"P00825105LZ","t":"Construction of Flood Control Structure along Angat River, Lumbang Bayan Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499893.19,"abc":96499809.83,"fy":"2024","sd":"05/28/2024","cd":"2024-07-31","lat":14.898942,"lon":120.854259,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.89941,120.85413],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1566},{"i":2039,"cid":"23DF0002","pid":"P00737504LZ","t":"Construction of Canal Lining in Barangay Poblacion (J. Castro and N. Ner Streets), Rosario, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"REND ENTERPRISES & GENERAL CONTRACTOR","c":4898131.51,"abc":4950000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-05-19","lat":14.416542,"lon":120.854303,"sm":1218,"fm":1218,"tm":1218,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1567},{"i":2040,"cid":"23CC0308","pid":"P00727276LZ","t":"Construction of Flood Control System along Angat River Lumang Bayan Section, Plaridel, Bulacan (Sta. 19+300 to Sta. 19+460)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199391.48,"abc":77199968.39,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.899272,"lon":120.854839,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.89963,120.85468],"wst":"matched","br":null,"len":160.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1568},{"i":2041,"cid":"22CC0266","pid":"P00621452LZ","t":"Rehabilitation of Flood Control Structure along Angat River, Poblacion to Lumang Bayan Section, Plaridel, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":14699511.91,"abc":14699511.91,"fy":"2022","sd":"04/04/2022","cd":"2022-08-31","lat":14.890882,"lon":120.855,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.89087,120.85566],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2639,2375],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0266 to 22CC0269) cover the same site, together worth PHP 96,119,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":664},{"i":2042,"cid":"23CC0063","pid":"P00726718LZ","t":"Construction of River Control Project along Angat River, Lumang Bayan Section, Sta. 03+190 to Sta. 03+340, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":29399001.49,"abc":29399509.57,"fy":"2023","sd":"02/06/2023","cd":"2023-04-18","lat":14.899301,"lon":120.855231,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.89977,120.85503],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1569},{"i":2043,"cid":"24CC0199","pid":"P00838367LZ","t":"Construction of Reinforced Concrete Slope Revetment at Barangay Tikay, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":67549811.86,"abc":67549854.67,"fy":"2024","sd":"05/21/2024","cd":"2024-09-30","lat":14.844015,"lon":120.855502,"sm":401,"fm":401,"tm":401,"am":597,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tikay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1570},{"i":2044,"cid":"24CC0481","pid":"P00820813LZ","t":"Construction of AMRIS Calantipay Creek Slope Protection, Baliwag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":32666424.01,"abc":32666819.02,"fy":"2024","sd":"05/28/2024","cd":"2024-08-29","lat":14.980577,"lon":120.855586,"sm":136,"fm":136,"tm":248,"am":67,"md":0.49,"ls":"boundary","ww":"AMRIS Calantipay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.52,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":556},{"i":2045,"cid":"24PF0029","pid":"P00821129LZ","t":"Construction of Flood Mitigation Structure along Agno River, Paneg-an Section, Sta. 3+228 - Sta. 4+402 (B.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"DJY CONSTRUCTION / NORJOHN CONSTRUCTION","c":62628581.73,"abc":62725000.0,"fy":"2024","sd":"06/14/2024","cd":"2024-10-22","lat":16.752147,"lon":120.856379,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.0,"wp":[16.75214,120.85638],"wst":"matched","br":null,"len":1174.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1571},{"i":2046,"cid":"22DF0150","pid":"P00637796LZ","t":"Concreting of Drainage System at Barangay Poblacion 2, Tanza, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R.C. SIMON CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-14","lat":14.399499,"lon":120.856406,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 2","len":null,"ph":null,"dup":[2047],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 9,900,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":903},{"i":2047,"cid":"22DF0151","pid":"P00637794LZ","t":"Concreting of Drainage System at Barangay Poblacion 3, Tanza, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FE S. REYES GENERAL CONTRACTOR CORP.","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-14","lat":14.3995,"lon":120.856407,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 3","len":null,"ph":null,"dup":[2046],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 9,900,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":904},{"i":2048,"cid":"22DF0152","pid":"P00637797LZ","t":"Construction of Drainage at Barangay Poblacion 3, Tanza, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R.C. SIMON CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-14","lat":14.399895,"lon":120.85694,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1572},{"i":2049,"cid":"23DF0003","pid":"P00737505LZ","t":"Construction of Canal Lining in Barangay Silangan II (Norveuric Subdivision) Rosario, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4899147.67,"abc":4950000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-05-19","lat":14.416583,"lon":120.857214,"sm":1218,"fm":1218,"tm":360,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silangan II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.98,"text":"The record contradicts itself: the municipality field and the pin point to Rosario, Cavite, but the title names Cavite City, Cavite, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":620},{"i":2050,"cid":"22DB0022","pid":"P00620557LZ","t":"Construction of Seawall at Barangay Sinisian East, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-12-07","lat":13.907326,"lon":120.85731,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinisian East","len":null,"ph":null,"dup":[2051],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":643},{"i":2051,"cid":"22DB0030","pid":"P00631280LZ","t":"Construction of Seawall, Brgy. Sinisian East (Phase II), Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-01-07","lat":13.907326,"lon":120.85731,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinisian East","len":null,"ph":"Phase II","dup":[2050],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":644},{"i":2052,"cid":"24CC0406","pid":"P00838526LZ","t":"Construction of Slope Protection, Barangay Paltao, Pulilan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":19299673.25,"abc":19299750.99,"fy":"2024","sd":"04/23/2024","cd":"2024-09-03","lat":14.901725,"lon":120.858056,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paltao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1573},{"i":2053,"cid":"21P00064","pid":"P00561459LZ","t":"Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Buguias","deo":"Benguet 2nd District Engineering Office","co":"JOMARCANN GENERAL CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96496794.18,"fy":"2021","sd":"01/07/2022","cd":"2022-12-03","lat":16.752,"lon":120.85813,"sm":245,"fm":null,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baculongan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1574},{"i":2054,"cid":"22EB0054","pid":"P00632931LZ","t":"Construction of Gabions, Barangay Batong Buhay, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"R.S. TAGALA CONSTRUCTION AND EQUIPMENT RENTALS","c":15725595.48,"abc":24750000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-12","lat":12.812019,"lon":120.858272,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batong Buhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1575},{"i":2055,"cid":"24EB0074","pid":"P00824745LZ","t":"Construction of Flood Control Structure at Barangay Lagnas, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":19594346.03,"abc":19600000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-05-15","lat":12.930845,"lon":120.858586,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lagnas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1576},{"i":2056,"cid":"24CC0080","pid":"P00821270LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Poblacion, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":72374778.18,"abc":72374911.2,"fy":"2024","sd":"02/07/2024","cd":"2024-10-03","lat":14.887562,"lon":120.858602,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.88785,120.85861],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1577},{"i":2057,"cid":"23EB0032","pid":"P00727376LZ","t":"Construction of Flood Control Structure along Amnay River, Claudio Salgado Section, Sta. 0 + 000 - Sta. 0 + 310, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":43768024.75,"abc":45080000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-11-20","lat":12.96276,"lon":120.85861,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.24,"wp":[12.96458,120.85983],"wst":"matched","br":null,"len":310.0,"ph":null,"dup":[2058],"run":[2058,2523,2841],"cl":[],"L":"field","s":47,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,846,168.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23EB0032 to 23EB0035) cover the same site, together worth PHP 178,999,585.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":117},{"i":2058,"cid":"23EB0033","pid":"P00726758LZ","t":"Construction of Flood Control Structure along Amnay River, Guitong Section, Sta. 0 + 000 - Sta. 0 + 459, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"STX ENTERPRISES","c":45078142.89,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-10","lat":12.96276,"lon":120.85861,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.24,"wp":[12.96458,120.85983],"wst":"matched","br":null,"len":459.0,"ph":null,"dup":[2057],"run":[2057,2523,2841],"cl":[],"L":"field","s":47,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,846,168.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23EB0032 to 23EB0035) cover the same site, together worth PHP 178,999,585.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":118},{"i":2059,"cid":"22CC0294","pid":"P00621565LZ","t":"Construction of Flood Control Structure along Angat River, Lumangbayan Section, Sta. 00 + 576 to Sta. 00 + 991, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":95534975.45,"abc":95534880.67,"fy":"2022","sd":"04/01/2022","cd":"2023-02-24","lat":14.896864,"lon":120.858611,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.89653,120.85909],"wst":"matched","br":null,"len":415.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1578},{"i":2060,"cid":"22CE0028","pid":"P00620528LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Bibiclat, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC. / NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":45320100.0,"abc":45320100.0,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":15.531466,"lon":120.859071,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.53182,120.859],"wst":"matched","br":"Bibiclat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1579},{"i":2061,"cid":"23CC0142","pid":"P00736015LZ","t":"Construction of Concrete Slope Protection along Guiguinto River Tabang (Tributary) Section, K002 + 850 - K003 + 210, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48249480.18,"abc":48249532.61,"fy":"2023","sd":"02/13/2023","cd":"2023-10-10","lat":14.834292,"lon":120.859275,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":1.56,"wp":[14.8371,120.87345],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1580},{"i":2062,"cid":"23CC0043","pid":"P00726723LZ","t":"Construction of Flood Control Structure along Angat River at Poblacion Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"EIGHT KIDS CONSTRUCTION AND TRADING","c":22784396.87,"abc":22784738.09,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.887319,"lon":120.859335,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.88783,120.85935],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1581},{"i":2063,"cid":"24EB0098","pid":"P00824736LZ","t":"Construction of Flood Control Structures along Mompong River, Batong Buhay Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":39197204.13,"abc":39200000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-08-15","lat":12.813015,"lon":120.859339,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Mompong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1582},{"i":2064,"cid":"22DF0061","pid":"P00620233LZ","t":"Construction of Revetment along Manila Bay, Brgy. Wawa 1, Rosario, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":89745000.0,"abc":89745000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-03-20","lat":14.42114,"lon":120.85941,"sm":1218,"fm":1218,"tm":1218,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wawa 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1583},{"i":2065,"cid":"22E00071","pid":"P00621108LZ","t":"Construction of Flood Control Structure, Amnay River, Sta. 0+000 - Sta. 0+307, Ilvita Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":43424892.57,"abc":226774789.4,"fy":"2022","sd":"07/06/2022","cd":"2023-07-03","lat":12.959739,"lon":120.859929,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.44,"wp":[12.96307,120.86217],"wst":"matched","br":null,"len":307.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1584},{"i":2066,"cid":"23CC0149","pid":"P00726478LZ","t":"Construction of River Control Project along Guiguinto River, Tabang Tributary Section, Sta. 01+000 to Sta. 01+360, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96497527.0,"abc":96499425.96,"fy":"2023","sd":"02/13/2023","cd":"2023-10-09","lat":14.834898,"lon":120.860775,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":1.39,"wp":[14.8371,120.87345],"wst":"matched","br":null,"len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1585},{"i":2067,"cid":"22DF0041","pid":"P00620567LZ","t":"Construction of Revetment along Cañas River, Brgy. Poblacion I, Phase II, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"AD PINEDA CONSTRUCTION / N.B. AVILA CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-21","lat":14.397821,"lon":120.860783,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.02,"wp":[14.39802,120.86085],"wst":"matched","br":"Poblacion I","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1586},{"i":2068,"cid":"22DF0053","pid":"P00620568LZ","t":"Construction of Revetment along Cañas River, Brgy. Tejero Section, Phase II, West Side section, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"BAQPRINCE CONSTRUCTION AND TRADING CORP.","c":47629922.43,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-05","lat":14.397839,"lon":120.860903,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.02,"wp":[14.39799,120.86095],"wst":"matched","br":"Tejero Section","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1587},{"i":2069,"cid":"22AI0061","pid":"P00620462LZ","t":"Construction of Flood Control Structure along Banila River at Don Justo Abalos, Umingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":29374620.62,"abc":29400000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-10","lat":15.93278,"lon":120.8614,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.11,"wp":[15.93189,120.8609],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1588},{"i":2070,"cid":"23CC0275","pid":"P00727279LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Poblacion Plaridel, Bulacan (K019+957 to K020+257)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":69841235.75,"abc":72374620.55,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.887925,"lon":120.861597,"sm":1152,"fm":1152,"tm":248,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.88842,120.8614],"wst":"matched","br":"Poblacion Plaridel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":7.31,"text":"The record contradicts itself: the municipality field and the pin point to Plaridel, Bulacan, but the title names Bulacan, Bulacan, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":493},{"i":2071,"cid":"22EB0028","pid":"P00620653LZ","t":"Construction of Flood Control Structure, Patrick River Lagnas Section, Sta. 0+000 - Sta. 0+390, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":30933863.5,"abc":49000000.0,"fy":"2022","sd":"05/31/2022","cd":"2023-01-09","lat":12.930668,"lon":120.862429,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.1,"wp":[12.92994,120.86195],"wst":"matched","br":null,"len":390.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1589},{"i":2072,"cid":"24CC0032","pid":"P00838389LZ","t":"Construction of Riverbank Protection Structure at Barangay Bulihan, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77188533.89,"abc":77199964.5,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.849277,"lon":120.80259,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1590},{"i":2073,"cid":"23CC0162","pid":"P00726488LZ","t":"Construction of Riverwall along Guiguinto River, Tabang (Tributary) Section, Sta. 01+370 to Sta. 01+730, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96497876.83,"abc":96499425.96,"fy":"2023","sd":"02/13/2023","cd":"2023-08-22","lat":14.836492,"lon":120.862596,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":1.17,"wp":[14.8371,120.87345],"wst":"matched","br":null,"len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1591},{"i":2074,"cid":"22PA0073","pid":"P00637052LZ","t":"Construction of Mapisla - Madao Flood Control, Licuan-Baay, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LICUAN-BAAY (LICUAN) (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48996810.89,"abc":48999940.99,"fy":"2022","sd":"04/13/2022","cd":"2022-09-15","lat":17.544166,"lon":120.862719,"sm":786,"fm":786,"tm":786,"am":786,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1592},{"i":2075,"cid":"22CF0028","pid":"P00620541LZ","t":"Construction of Flood Control Structure in Barangay Buliran, San Antonio, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ANTONIO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":24499995.94,"abc":24499928.44,"fy":"2022","sd":"02/14/2022","cd":"2022-11-03","lat":15.264772,"lon":120.862952,"sm":1256,"fm":1256,"tm":1256,"am":1256,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buliran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1593},{"i":2076,"cid":"23DF0030","pid":"P00725810LZ","t":"Construction of Revetment along Manila Bay, Barangay Ligtong 1, Phase II, Rosario, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":75035504.1,"abc":75035505.0,"fy":"2023","sd":"02/19/2023","cd":"2024-01-03","lat":14.42574,"lon":120.86334,"sm":1218,"fm":1218,"tm":1218,"am":1218,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ligtong 1","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1594},{"i":2077,"cid":"24CC0076","pid":"P00821264LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Banga I, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":72373592.08,"abc":72374940.39,"fy":"2024","sd":"02/07/2024","cd":"2024-10-03","lat":14.889499,"lon":120.863609,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.8897,120.86343],"wst":"matched","br":"Banga I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1595},{"i":2078,"cid":"22DF0332","pid":"P00621543LZ","t":"Construction of Drainage along Noveleta Naic-Tagaytay Road, Rosario, Cavite, K0028 + 453.375 - K0029 + 523.75 (Both Sides) (Phase 2)","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-03-15","lat":14.423056,"lon":120.863611,"sm":1218,"fm":1218,"tm":360,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.04,"text":"The record contradicts itself: the municipality field and the pin point to Rosario, Cavite, but the title names Cavite City, Cavite, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":582},{"i":2079,"cid":"23CC0054","pid":"P00726719LZ","t":"Construction of River Control Project along Angat River, Banga Section, Sta. 17+650 to Sta. 17+750, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":29399409.16,"abc":29399673.58,"fy":"2023","sd":"02/06/2023","cd":"2023-06-05","lat":14.890745,"lon":120.865743,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.8912,120.86545],"wst":"matched","br":null,"len":100.0,"ph":null,"dup":[],"run":[2601,2572,2885],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CC0052 to 23CC0055) cover the same site, together worth PHP 150,182,208.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":610},{"i":2080,"cid":"23DF0001","pid":"P00737506LZ","t":"Construction of Canal Lining in Barangay Bagbag II (Farmers Village), Rosario, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4899144.03,"abc":4950000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-05-19","lat":14.420706,"lon":120.865889,"sm":1218,"fm":1218,"tm":1218,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbag II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1596},{"i":2081,"cid":"23DF0031","pid":"P00726553LZ","t":"Construction of Revetment along Ilang-Ilang River, Barangay Malagasang, Phase II, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":91674088.89,"abc":91675000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-11-20","lat":14.375381,"lon":120.913931,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.69,"wp":[14.36341,120.882],"wst":"matched","br":"Malagasang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1597},{"i":2082,"cid":"24CC0077","pid":"P00821265LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Banga II, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BELL CONSTRUCTION","c":72374848.46,"abc":72374905.39,"fy":"2024","sd":"02/07/2024","cd":"2024-04-26","lat":14.891659,"lon":120.868161,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.89208,120.86816],"wst":"matched","br":"Banga II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1598},{"i":2083,"cid":"22AI0058","pid":"P00631094LZ","t":"Construction of Flood Control Structure along Banila River, Barangay Don Justo Abalos, Umingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY","c":48960218.92,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-10","lat":15.92967,"lon":120.86856,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.01,"wp":[15.92962,120.86855],"wst":"matched","br":"Don Justo Abalos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1599},{"i":2084,"cid":"25CF0004","pid":"P00921788LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Barangay Calaba, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"TRIPLE S BUILDERS INC.","c":34128123.18,"abc":34299998.36,"fy":"2025","sd":"02/11/2025","cd":"2025-03-25","lat":15.303961,"lon":120.868675,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.03,"wp":[15.30411,120.86842],"wst":"matched","br":"Calaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1600},{"i":2085,"cid":"24DB0021","pid":"P00839597LZ","t":"Construction of Flood Mitigation Structure, Barangay Tubuan, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"SANDBANK CONSTRUCTION CORP.","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-04-15","lat":13.948049,"lon":120.870405,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tubuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1601},{"i":2086,"cid":"22OA0069","pid":"P00640484LZ","t":"Construction of Floodwall along Chungkang River (Phase 2), Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49414754.65,"abc":48997250.26,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.686654,"lon":120.935097,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Chungkang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.39,"value":1.00852,"text":"Contract cost is 0.85% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":742},{"i":2087,"cid":"23DF0020","pid":"P00725809LZ","t":"Construction of Revetment along Manila Bay, Barangay San Salcedo, Phase II, Noveleta, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"02/19/2023","cd":"2024-01-05","lat":14.4323,"lon":120.8707,"sm":1026,"fm":1026,"tm":1026,"am":1026,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Salcedo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1602},{"i":2088,"cid":"23CF0031","pid":"P00727300LZ","t":"Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 25+760.00-Sta. 26+048.40, Barangay Calaba, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / R.G. DELA CRUZ CONSTRUCTION","c":72374938.44,"abc":72374944.92,"fy":"2023","sd":"03/24/2023","cd":"2023-06-13","lat":15.3051,"lon":120.8712,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.09,"wp":[15.3059,120.8712],"wst":"matched","br":"Calaba","len":288.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1603},{"i":2089,"cid":"23DF0021","pid":"P00725808LZ","t":"Construction of Revetment along Manila Bay, Barangay San Rafael 4 Phase 4, Noveleta, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/19/2023","cd":"2024-01-22","lat":14.4331,"lon":120.8713,"sm":1026,"fm":1026,"tm":1026,"am":1026,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Rafael 4 Phase 4","len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1604},{"i":2090,"cid":"23CC0064","pid":"P00726724LZ","t":"Construction of Flood Control Structure along Angat River at Banga 2nd Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"NICLEDON CONSTRUCTION","c":22784013.43,"abc":22784568.69,"fy":"2023","sd":"02/06/2023","cd":"2023-09-03","lat":14.891745,"lon":120.872001,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.89226,120.872],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1605},{"i":2091,"cid":"23CC0062","pid":"P00726154LZ","t":"Construction of Flood Control Structure along Bagbag Creek, Pritil Section, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999690.4,"abc":48999237.11,"fy":"2023","sd":"02/06/2023","cd":"2023-06-26","lat":14.863134,"lon":120.872065,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":11.3,"wp":[14.90292,120.77539],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1606},{"i":2092,"cid":"22CC0324","pid":"P00620517LZ","t":"Construction of Flood Control Structure Pritil Section, Guiguinto, Bulacan, Sta. 00 + 370 - Sta. 00 + 674","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":43119406.29,"abc":43119227.76,"fy":"2022","sd":"05/27/2022","cd":"2022-12-22","lat":14.863097,"lon":120.872117,"sm":597,"fm":597,"tm":248,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":304.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.4,"text":"The record contradicts itself: the municipality field and the pin point to Guiguinto, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":557},{"i":2093,"cid":"23CC0076","pid":"P00726474LZ","t":"Construction of River Control Project along Guiguinto River, Barangay Pritil, Sta. 02+470 - Sta. 02+830, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":96497659.5,"abc":96499315.82,"fy":"2023","sd":"02/13/2023","cd":"2023-12-19","lat":14.861431,"lon":120.872329,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":1.44,"wp":[14.85018,120.87911],"wst":"matched","br":"Pritil","len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1607},{"i":2094,"cid":"22DF0331","pid":"P00621542LZ","t":"Construction of Drainage along Noveleta Naic-Tagaytay Road, Rosario, Cavite, K0027 + 383-K0028 + 453.375 (Both Sides) (Phase 1)","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"ROSARIO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-03-15","lat":14.424966,"lon":120.872339,"sm":1218,"fm":1218,"tm":360,"am":1218,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.54,"text":"The record contradicts itself: the municipality field and the pin point to Rosario, Cavite, but the title names Cavite City, Cavite, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":583},{"i":2095,"cid":"24CE0017","pid":"P00820274LZ","t":"Rehabilitation of Dike along Talavera River, Barangay San Alejandro, Quezon, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / BRYAN PAUL P. PACHECO CONST. CORP.","c":95534525.49,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.548346,"lon":120.87255,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.18,"wp":[15.5489,120.87414],"wst":"matched","br":"San Alejandro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1608},{"i":2096,"cid":"24CC0057","pid":"P00839481LZ","t":"Construction of Slope Protection Structure and Waterways, Barangay Malis, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":59399639.41,"abc":59399968.49,"fy":"2024","sd":"03/20/2024","cd":"2024-09-17","lat":14.85024,"lon":120.87256,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malis","len":null,"ph":null,"dup":[],"run":[],"cl":[2101,2805,2817,2819,2820,2822,2845,2875],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1011},{"i":2097,"cid":"24CC0163","pid":"P00823460LZ","t":"Construction of River Control Structure at Barangay Pritil Purok 1 to Purok 2, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199409.66,"abc":77199462.44,"fy":"2024","sd":"02/28/2024","cd":"2024-09-23","lat":14.856882,"lon":120.872721,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pritil Purok 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1609},{"i":2098,"cid":"24CC0156","pid":"P00845969LZ","t":"Construction of Guiguinto Flood Control Structure, Pritil Section, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JOSE RUBI CONSTRUCTION","c":19799198.1,"abc":19799487.72,"fy":"2024","sd":"03/01/2024","cd":"2024-06-28","lat":14.856509,"lon":120.872727,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1610},{"i":2099,"cid":"24CC0066","pid":"P00839577LZ","t":"Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":19739693.36,"abc":19799974.88,"fy":"2024","sd":"02/02/2024","cd":"2024-06-11","lat":14.856509,"lon":120.872827,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":11.68,"wp":[14.90292,120.77539],"wst":"matched","br":"Pritil","len":null,"ph":null,"dup":[2100],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,739,350.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1012},{"i":2100,"cid":"24CC0290","pid":"P00845803LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Pritil, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999656.35,"abc":98999813.35,"fy":"2024","sd":"04/25/2024","cd":"2024-10-14","lat":14.856509,"lon":120.872827,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pritil","len":null,"ph":null,"dup":[2099],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,739,350.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":675},{"i":2101,"cid":"24CC0055","pid":"P00839476LZ","t":"Construction of Riverbank Protection Structure at Barangay Malis (Phase III), Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":98999939.04,"abc":98999868.17,"fy":"2024","sd":"02/07/2024","cd":"2024-09-19","lat":14.849,"lon":120.87286,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malis","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[2096,2805,2817,2819,2820,2822,2845,2875],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":953},{"i":2102,"cid":"23CC0216","pid":"P00740348LZ","t":"Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":72374703.78,"abc":72374068.34,"fy":"2023","sd":"03/28/2023","cd":"2023-12-18","lat":14.858141,"lon":120.872925,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":11.61,"wp":[14.90292,120.77539],"wst":"matched","br":"Pritil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1611},{"i":2103,"cid":"23DF0013","pid":"P00726213LZ","t":"Construction of Revetment along Cañas River, Barangay Bunga, Phase III, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION / J.V. SARIGNAYA CONSTRUCTION CORPORATION","c":48484888.32,"abc":49000000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-06-02","lat":14.356503,"lon":120.872942,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.0,"wp":[14.3565,120.87295],"wst":"matched","br":"Bunga","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1612},{"i":2104,"cid":"24CE0221","pid":"P00823432LZ","t":"Construction/Rehabilitation of Flood Control Structures along Labong River, Brgy. Tabing Ilog, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":47767302.32,"abc":48250000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-09-20","lat":15.575897,"lon":120.765861,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":2.24,"wp":[15.55864,120.75488],"wst":"matched","br":"Tabing Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1613},{"i":2105,"cid":"23CC0129","pid":"P00726460LZ","t":"Construction of River Control Project at Barangay Piel, Sta. 01+000 to Sta. 01+400, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499420.64,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-11-10","lat":14.981879,"lon":120.882311,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":400.0,"ph":null,"dup":[],"run":[2256,2336],"cl":[2256,2336,2630,2856,2860,2861,2874,2881,2890,2893],"L":"field","s":55,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0129 to 23CC0131) cover the same site, together worth PHP 289,497,821.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":72},{"i":2106,"cid":"23CC0185","pid":"P00740597LZ","t":"Construction of Flood Mitigation Structure, Brgy. Abulalas, Hagonoy, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":24499212.65,"abc":24499668.93,"fy":"2023","sd":"03/21/2023","cd":"2023-08-08","lat":14.856527,"lon":120.766166,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abulalas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1614},{"i":2107,"cid":"24DB0023","pid":"P00846030LZ","t":"Construction of Flood Mitigation Structure, Taal, Batangas Phase 2","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TAAL (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"L.P.O. ENTERPRISES","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"04/24/2024","cd":"2024-07-10","lat":13.860701,"lon":120.914049,"sm":1500,"fm":1500,"tm":1500,"am":1500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1615},{"i":2108,"cid":"22CC0147","pid":"P00631214LZ","t":"Rehabilitation of Flood Control Structures along Guiguinto River, Malis Section, Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45077524.96,"abc":45079678.05,"fy":"2022","sd":"03/04/2022","cd":"2022-11-21","lat":14.842591,"lon":120.882376,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.03,"wp":[14.84264,120.8821],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1616},{"i":2109,"cid":"24CC0198","pid":"P00838363LZ","t":"Construction of Reinforced Concrete Slope Revetment at Barangay Bulihan, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":62724643.44,"abc":62724787.72,"fy":"2024","sd":"03/20/2024","cd":"2024-09-10","lat":14.849633,"lon":120.803941,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1617},{"i":2110,"cid":"22DF0052","pid":"P00631289LZ","t":"Construction of Flood Control Structure along Manila Bay, Barangay San Rafael IV, Noveleta, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-04","lat":14.421389,"lon":120.914167,"sm":1026,"fm":1026,"tm":1026,"am":705,"md":2.67,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Rafael IV","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1618},{"i":2111,"cid":"22DG0048","pid":"P00631291LZ","t":"Construction of Flood Control Structure at Barangay Ibayo Estacion, Naic, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NAIC (CAVITE)","deo":"Cavite 2nd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":30582429.65,"abc":34299950.11,"fy":"2022","sd":"03/14/2022","cd":"2023-11-29","lat":14.31991,"lon":120.76617,"sm":1009,"fm":1009,"tm":1009,"am":1009,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ibayo Estacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1619},{"i":2112,"cid":"22DQ0007","pid":"P00631295LZ","t":"Construction of Flood Mitigation Structures along Bacoor River, Phase 4, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":48995805.15,"abc":48999988.37,"fy":"2022","sd":"02/24/2022","cd":"2022-12-02","lat":14.45563,"lon":120.9351,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.45561,120.93517],"wst":"matched","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1620},{"i":2113,"cid":"22DF0024","pid":"P00620881LZ","t":"Construction of Revetment along Imus River, Brgy. Binakayan, Kawit, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"BAQPRINCE CONSTRUCTION AND TRADING CORP. / R.V. RIETA TRADING & GENERAL CONSTRUCTION","c":89745000.0,"abc":89745000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-05","lat":14.458056,"lon":120.925556,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.06,"wp":[14.45857,120.9258],"wst":"matched","br":"Binakayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1621},{"i":2114,"cid":"24CC0013","pid":"P00838397LZ","t":"Construction of Riverbank Protection Structure at Barangay Iba, Hagonoy, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199192.34,"abc":77199982.41,"fy":"2024","sd":"02/07/2024","cd":"2024-09-03","lat":14.860205,"lon":120.766335,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1622},{"i":2115,"cid":"23CC0023","pid":"P00726153LZ","t":"Construction of Flood Control Structure along Bocaue River, Bambang Section, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.G. FRANCISCO CONSTRUCTION","c":48999126.15,"abc":48999477.41,"fy":"2023","sd":"02/06/2023","cd":"2023-10-20","lat":14.769489,"lon":120.925928,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1623},{"i":2116,"cid":"22CD0052","pid":"P00620156LZ","t":"Construction of Flood Control Structure at Cruz na Daan, San Agustin Creek, along Daang Maharlika Highway, Cruz na Daan, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":54171436.39,"abc":55004758.48,"fy":"2022","sd":"03/07/2022","cd":"2022-10-05","lat":15.03097,"lon":120.93521,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"San Agustin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1624},{"i":2117,"cid":"22CC0263","pid":"P00621285LZ","t":"Improvement of Balagtas River Waterways with Flood Control Structure, Sta. 0 + 000 to Sta. 0 + 540, Longos, Balagtas, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":86849456.87,"abc":86849958.13,"fy":"2022","sd":"04/01/2022","cd":"2023-01-25","lat":14.823853,"lon":120.914368,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.82396,120.91426],"wst":"matched","br":null,"len":540.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1625},{"i":2118,"cid":"22DF0023","pid":"P00620874LZ","t":"Construction of Revetment along Ilang-Ilang River, Brgy. Pasong Kawayan, Phase II, Gen. Trias, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":81542500.0,"abc":81542500.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-12","lat":14.350111,"lon":120.882432,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":1.09,"wp":[14.35988,120.88143],"wst":"matched","br":"Pasong Kawayan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1626},{"i":2119,"cid":"22AA0042","pid":"P00620799LZ","t":"Construction/Rehabilitation of Flood Control Structure along Quibel River, Brgy. Kalaw, Dumalneg, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"DUMALNEG (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS)","c":85884916.66,"abc":85884919.01,"fy":"2022","sd":"03/03/2022","cd":"2023-04-24","lat":18.511534,"lon":120.804042,"sm":537,"fm":537,"tm":537,"am":537,"md":0.0,"ls":"inside","ww":"Quibel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Kalaw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1627},{"i":2120,"cid":"23OA0015","pid":"P00725924LZ","t":"Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 5)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":49000000.0,"abc":48998975.15,"fy":"2023","sd":"02/15/2023","cd":"2023-10-12","lat":14.698672,"lon":120.926105,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 5","dup":[],"run":[2188,2741],"cl":[2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OA0013 to 23OA0015) cover the same site, together worth PHP 147,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":44},{"i":2121,"cid":"22CC0176","pid":"P00640521LZ","t":"Construction of River Protection along Brgy. Sta. Ines, Bulakan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":19798932.24,"abc":19799549.97,"fy":"2022","sd":"04/05/2022","cd":"2022-08-18","lat":14.785524,"lon":120.882498,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Ines","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1628},{"i":2122,"cid":"24PI0010","pid":"P00821543LZ","t":"Construction of Monamon Norte Flood Control along Chico River, Panas Section, Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BAUKO (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"OLSIM CONSTRUCTION / GELLE CONSTRUCTION SERVICES","c":39200000.0,"abc":39199999.6,"fy":"2024","sd":"02/18/2024","cd":"2024-05-13","lat":16.89485,"lon":120.91455,"sm":189,"fm":189,"tm":189,"am":1226,"md":0.35,"ls":"boundary","ww":"Chico","wn":"Chico River","wd":0.01,"wp":[16.89484,120.91463],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1629},{"i":2123,"cid":"22CE0176","pid":"P00640522LZ","t":"Construction of Drainage Canal, Brgy. Poblacion, Guimba, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"KEVIN PAUL CONSTRUCTION","c":4850929.84,"abc":4950000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-08-29","lat":15.661126,"lon":120.766473,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1630},{"i":2124,"cid":"22DF0017","pid":"P00621095LZ","t":"Construction of Revetment along Imus River, Brgy Toclong, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":9308892.5,"abc":9800000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-18","lat":14.43975,"lon":120.93526,"sm":638,"fm":638,"tm":638,"am":98,"md":0.01,"ls":"boundary","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.43974,120.93525],"wst":"matched","br":"Toclong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1631},{"i":2125,"cid":"22CC0011","pid":"P00631202LZ","t":"Construction of River Protection at Barangay Sta. Ana, Phase 2, Bulakan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":19599146.33,"abc":19599653.99,"fy":"2022","sd":"01/28/2022","cd":"2022-08-16","lat":14.78556,"lon":120.8825,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Ana","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1632},{"i":2126,"cid":"22CC0005","pid":"P00632820LZ","t":"Construction of River Protection along Barangay Dampol II-B, Pulilan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":13859903.3,"abc":13859739.33,"fy":"2022","sd":"01/28/2022","cd":"2022-07-04","lat":14.902236,"lon":120.804147,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampol II-B","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1633},{"i":2127,"cid":"23CC0135","pid":"P00726483LZ","t":"Construction of River Control Project along Balagtas River, Pandi Section, Sta. 01+690 to Sta. 02+040, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96447739.58,"abc":96499971.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-11","lat":14.832243,"lon":120.926144,"sm":1084,"fm":1084,"tm":1084,"am":117,"md":0.06,"ls":"boundary","ww":"Balagtas","wn":"Balagtas River","wd":0.06,"wp":[14.83172,120.92641],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1634},{"i":2128,"cid":"23AA0142","pid":"P00725630LZ","t":"Construction of Flood Control Structure along Pasaleng River, Brgy. Pasaleng, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS / LINEAR CONSTRUCTION CORP.","c":57899823.82,"abc":57899962.12,"fy":"2023","sd":"04/12/2023","cd":"2023-11-17","lat":18.543461,"lon":120.935512,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Pasaleng","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pasaleng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1635},{"i":2129,"cid":"22CC0012","pid":"P00631205LZ","t":"Construction of River Protection, Sta. Ana, Bulacan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SAMJS CONSTRUCTION SERVICES","c":26459286.24,"abc":26459498.59,"fy":"2022","sd":"04/05/2022","cd":"2022-10-06","lat":14.785633,"lon":120.882593,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1636},{"i":2130,"cid":"24OA0034","pid":"P00820543LZ","t":"Construction of Flood Mitigation Structure, Dampalit Riverwall (Phase 9), Barangay Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":49000000.0,"abc":48998648.85,"fy":"2024","sd":"02/12/2024","cd":"2024-10-08","lat":14.700229,"lon":120.926169,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 9","dup":[],"run":[2322,2252],"cl":[2120,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0032 to 24OA0034) cover the same site, together worth PHP 146,998,200.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":45},{"i":2131,"cid":"21PA0236","pid":"P00561489LZ","t":"Construction of Botnong Flood Control, Tineg, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Tineg","deo":"Abra District Engineering Office","co":"R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION)","c":48997193.69,"abc":48999802.15,"fy":"2021","sd":"01/20/2022","cd":"2022-10-05","lat":17.823611,"lon":120.804167,"sm":1568,"fm":null,"tm":1568,"am":1568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1637},{"i":2132,"cid":"22CC0212","pid":"P00621482LZ","t":"Rehabilitation of Waterways and Construction of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SAMJS CONSTRUCTION SERVICES","c":29398972.04,"abc":29399093.26,"fy":"2022","sd":"04/05/2022","cd":"2022-11-30","lat":14.824802,"lon":120.914688,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.82481,120.91467],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1638},{"i":2133,"cid":"23OA0037","pid":"P00742221LZ","t":"Construction of Judge Roldan Pumping Station, San Roque, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":19799376.22,"abc":19798724.75,"fy":"2023","sd":"03/27/2023","cd":"2023-10-10","lat":14.668928,"lon":120.935518,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1639},{"i":2134,"cid":"24CC0357","pid":"P00823451LZ","t":"Construction of Revetment at Carillo - Abulalas along Angat River at Hagonoy, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":38599219.72,"abc":38599883.49,"fy":"2024","sd":"04/18/2024","cd":"2024-10-14","lat":14.859824,"lon":120.766507,"sm":612,"fm":612,"tm":248,"am":612,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.85972,120.76695],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.09,"text":"The record contradicts itself: the municipality field and the pin point to Hagonoy, Bulacan, but the title names Bulacan, Bulacan, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":558},{"i":2135,"cid":"23CC0217","pid":"P00740587LZ","t":"Construction of River Protection along Bocaue River, K001 + 370 to K001 + 570, barangay Taal, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION / BOLTRON BUILDERS CORPORATION","c":48999923.37,"abc":48999812.59,"fy":"2023","sd":"03/21/2023","cd":"2023-11-13","lat":14.810296,"lon":120.935755,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Taal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1640},{"i":2136,"cid":"21AA0082","pid":"P00526252LZ","t":"Construction of Flood Control Project along Bolo River Tributaries, Sitio Kamansiliten, Dampig, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Pagudpud","deo":"Ilocos Norte 1st District Engineering Office","co":"BLUE MOUNTAIN BUILDERS & GENERAL MDSE.(FOR. BLUE M","c":81059647.56,"abc":81059648.98,"fy":"2021","sd":"12/24/2021","cd":"2022-07-15","lat":18.535396,"lon":120.804481,"sm":1062,"fm":null,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Bolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1641},{"i":2137,"cid":"22DF0008","pid":"P00620873LZ","t":"Construction of Revetment along Ilang-Ilang River, Brgy. Malagasang, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FROMARC BUILDERS & GEN. MERCHANDISE / TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":90709000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-11","lat":14.36889,"lon":120.91472,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.58,"wp":[14.36334,120.88201],"wst":"matched","br":"Malagasang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1642},{"i":2138,"cid":"23CC0126","pid":"P00735979LZ","t":"Construction of Flood Mitigation Structures along Barangay Bambang, Bulacan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199976.53,"abc":77199601.04,"fy":"2023","sd":"02/13/2023","cd":"2023-11-13","lat":14.776653,"lon":120.88272,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1643},{"i":2139,"cid":"24CE0100","pid":"P00823470LZ","t":"Construction of Flood Control Structure along Labong River, Barangay Caingin Tabing Ilog, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":47767320.74,"abc":48250000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-09-26","lat":15.577377,"lon":120.766659,"sm":598,"fm":598,"tm":598,"am":598,"md":0.0,"ls":"inside","ww":"Labong","wn":"Labong River","wd":2.43,"wp":[15.55864,120.75488],"wst":"matched","br":"Caingin Tabing Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1644},{"i":2140,"cid":"23EB0023","pid":"P00726263LZ","t":"Construction of Flood Control Structure along Patrick River, Claudio Salgado Section, Sta. 0+000 - Sta. 0+310, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":45073999.67,"abc":45080000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-12-12","lat":12.92469,"lon":120.80501,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.18,"wp":[12.92619,120.80577],"wst":"matched","br":null,"len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1645},{"i":2141,"cid":"22DF0145","pid":"P00631288LZ","t":"Construction of Flood Control Structure (Riprap), Barangay 9 Road, Amadeo, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"AMADEO (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R.V. RIETA TRADING & GENERAL CONSTRUCTION","c":9304769.1,"abc":9800000.0,"fy":"2022","sd":"03/06/2022","cd":"2022-08-06","lat":14.167994,"lon":120.92626,"sm":50,"fm":50,"tm":50,"am":50,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"9 Road","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1646},{"i":2142,"cid":"22DF0006","pid":"P00620875LZ","t":"Construction of Revetment along Ilang-Ilang River, Brgy. Sta. Clara Section, Phase V, Gen. Trias, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":81924640.0,"abc":81924640.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-12","lat":14.374455,"lon":120.882739,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":0.88,"wp":[14.36675,120.88075],"wst":"matched","br":"Sta. Clara Section","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1647},{"i":2143,"cid":"23OA0060","pid":"P00742227LZ","t":"Construction of Riverwalls along Tangos River, Navotas City (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":49499652.24,"abc":49495301.45,"fy":"2023","sd":"03/27/2023","cd":"2024-01-20","lat":14.674853,"lon":120.935895,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Tangos","wn":"Tangos River","wd":0.04,"wp":[14.67516,120.93606],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1648},{"i":2144,"cid":"23DB0058","pid":"P00737489LZ","t":"Construction of Flood Mitigation Structure, Barangay Pantay, Calaca, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF CALACA (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"W. GOMEZ TRADING AND CONSTRUCTION","c":6930000.0,"abc":6930000.0,"fy":"2023","sd":"05/25/2023","cd":"2023-08-27","lat":13.970616,"lon":120.805209,"sm":292,"fm":292,"tm":292,"am":292,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pantay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1649},{"i":2145,"cid":"24CE0330","pid":"P00844536LZ","t":"Construction of Drainage Structure, Barangay Bantug, Talavera, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":19107581.48,"abc":19300000.0,"fy":"2024","sd":"06/14/2024","cd":"2025-01-09","lat":15.559064,"lon":120.914844,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bantug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1650},{"i":2146,"cid":"21PA0237","pid":"P00561517LZ","t":"Construction of Wayangan Flood Control, Tubo, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Tubo","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":96496961.02,"abc":97999983.85,"fy":"2021","sd":"12/28/2021","cd":"2022-11-21","lat":17.45578,"lon":120.766942,"sm":1594,"fm":null,"tm":1594,"am":1242,"md":12.89,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":55,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.89,"text":"The pin is 12.9 km outside Tubo, Abra, the nearest municipality the record claims. It falls in Sallapadan, Abra.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":143},{"i":2147,"cid":"22E00071","pid":"P00621109LZ","t":"Construction of Flood Control Structure, Amnay River, Sta. 1+303 - Sta. 1+680, Guitong Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":43424984.72,"abc":226774789.4,"fy":"2022","sd":"07/06/2022","cd":"2023-07-03","lat":12.975377,"lon":120.915261,"sm":1228,"fm":1228,"tm":1228,"am":1380,"md":0.06,"ls":"boundary","ww":"Amnay","wn":"Amnay River","wd":0.01,"wp":[12.97542,120.91514],"wst":"matched","br":null,"len":377.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1651},{"i":2148,"cid":"24DE0009","pid":"P00823538LZ","t":"Construction of Flood Control Structure at San Teodoro to Bagalangit, Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":24125000.0,"abc":24500000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-15","lat":13.703436,"lon":120.883311,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1652},{"i":2149,"cid":"23CC0084","pid":"P00726484LZ","t":"Construction of River Control Project along Bocaue River, Bambang Section, Sta. 08+790 to Sta. 08+995, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499970.89,"abc":96499156.63,"fy":"2023","sd":"02/13/2023","cd":"2023-06-07","lat":14.769408,"lon":120.926267,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":205.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1653},{"i":2150,"cid":"22DB0020","pid":"P00620892LZ","t":"Construction of Riverbank Protection along Pansipit River, 0+750 - 1+193, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-01","lat":13.887104,"lon":120.915444,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":"Pansipit","wn":"Pansipit River","wd":0.05,"wp":[13.88736,120.91587],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1654},{"i":2151,"cid":"22CE0074","pid":"P00620168LZ","t":"Construction of Flood Control Structures along Labong River, Brgy. Manacsac, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-17","lat":15.578085,"lon":120.768192,"sm":598,"fm":598,"tm":598,"am":785,"md":0.01,"ls":"boundary","ww":"Labong","wn":"Labong River","wd":2.58,"wp":[15.55864,120.75488],"wst":"matched","br":"Manacsac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1655},{"i":2152,"cid":"22OA0035","pid":"P00620340LZ","t":"Construction of Flood Control Structure (Floodwall) along Chungkang River, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / TOPNOTCH CATALYST BUILDERS INC.","c":48989387.07,"abc":48999504.27,"fy":"2022","sd":"02/14/2022","cd":"2022-09-23","lat":14.686043,"lon":120.935965,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Chungkang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1656},{"i":2153,"cid":"23DE0055","pid":"P00725779LZ","t":"Construction of Flood Mitigation Structure (Seawall), Brgy. Banoyo, San Luis, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION / THREE W BUILDERS, INC.","c":50509065.0,"abc":50509065.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-31","lat":13.83639,"lon":120.91605,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banoyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1657},{"i":2154,"cid":"23CC0244","pid":"P00742157LZ","t":"Construction of Flood Mitigation Structures along Bgry. Caliligawan, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":69295781.68,"abc":69299992.13,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.771319,"lon":120.807465,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1658},{"i":2155,"cid":"23CC0046","pid":"P00737455LZ","t":"Construction of Drainage Canal, Bonga Menor, Bustos, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PLL BUILDERS INC.","c":4948539.44,"abc":4949760.23,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.951864,"lon":120.936095,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1659},{"i":2156,"cid":"23CG0105","pid":"P00726911LZ","t":"Construction of Slope Protection Works at Maasim River, Phase II (Tributary Of Pampanga River) barangay Pulong Gubat, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68321428.5,"abc":72375000.0,"fy":"2023","sd":"04/04/2023","cd":"2024-01-11","lat":15.0458,"lon":120.916267,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.02,"wp":[15.04563,120.91618],"wst":"matched","br":"Pulong Gubat","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1660},{"i":2157,"cid":"23CC0036","pid":"P00737454LZ","t":"Construction of Drainage Canal, Liciada, Bustos, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TIONGCO MENDOZA CONSTRUCTION CO. INC.","c":4949134.05,"abc":4949642.02,"fy":"2023","sd":"02/06/2023","cd":"2023-03-21","lat":14.906697,"lon":120.926286,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1661},{"i":2158,"cid":"23CC0203","pid":"P00742326LZ","t":"Construction of River Protection Structures and Improvement of Waterways Caliligawan, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":49498339.64,"abc":49499836.75,"fy":"2023","sd":"03/27/2023","cd":"2023-11-08","lat":14.771059,"lon":120.807531,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1662},{"i":2159,"cid":"22CC0250","pid":"P00621279LZ","t":"Bank Improvement along Angat River, Sta. 0 + 525 to Sta. 0 + 895, Brgy. Sulivan, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":67550000.0,"abc":67549939.97,"fy":"2022","sd":"04/04/2022","cd":"2023-09-28","lat":14.983661,"lon":120.88341,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":3.96,"wp":[14.95678,120.90766],"wst":"matched","br":"Sulivan","len":370.0,"ph":null,"dup":[],"run":[],"cl":[2190,2271,2311,2381,2391,2402,2419,2462,2463,2899],"L":"records","s":51,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":3.96,"text":"The title names Angat, which OpenStreetMap maps through the stated municipality, but the pin is 4.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":181},{"i":2160,"cid":"22CC0010","pid":"P00631184LZ","t":"Construction of Flood Control Structure along Purok 4, Burgos St., Barangay Poblacion, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SAMJS CONSTRUCTION SERVICES","c":19595787.01,"abc":19599454.59,"fy":"2022","sd":"01/28/2022","cd":"2022-10-24","lat":14.9183,"lon":120.7683,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1663},{"i":2161,"cid":"22CE0121","pid":"P00639361LZ","t":"Construction of Slope Protection along Talavera River, Brgy. San Jose, Licab, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-12-07","lat":15.512181,"lon":120.80874,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.16,"wp":[15.51127,120.80991],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1664},{"i":2162,"cid":"24CD0104","pid":"P00825062LZ","t":"Construction of Flood Control Structure along Meycauayan River (Tawiran - Wawang Pulo Section), Sta. 02+200 - Sta. 02+300, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499745.71,"abc":96499852.52,"fy":"2024","sd":"03/18/2024","cd":"2025-01-26","lat":14.745834,"lon":120.916777,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.06,"wp":[14.74637,120.91691],"wst":"matched","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1665},{"i":2163,"cid":"23OA0046","pid":"P00726996LZ","t":"Construction of Milflores Pumping Station, Brgy. Tanza 2, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":23272477.27,"abc":23270195.15,"fy":"2023","sd":"03/08/2023","cd":"2023-12-27","lat":14.681703,"lon":120.936097,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1666},{"i":2164,"cid":"23CC0004","pid":"P00726157LZ","t":"Construction of Flood Control Structure along Barangay Sapang Bayan, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999697.32,"abc":48999752.5,"fy":"2023","sd":"02/06/2023","cd":"2023-06-23","lat":14.920166,"lon":120.768549,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1667},{"i":2165,"cid":"24CF0004","pid":"P00821255LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Barangay Ibabao Bana, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":86849964.84,"abc":86849964.87,"fy":"2024","sd":"02/13/2024","cd":"2024-08-06","lat":15.47067,"lon":120.91699,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[15.47044,120.91736],"wst":"matched","br":"Ibabao Bana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1668},{"i":2166,"cid":"24CJ0229","pid":"P00823400LZ","t":"Construction of Flood Control Structure along Baket-Baket River, Package C, Moncada, Tarlac","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"TARLAC","mu":"MONCADA (TARLAC)","deo":"Tarlac District Engineering Office","co":"T2B3 BUILDERS AND SUPPLIES CORP.","c":99000000.0,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-10-16","lat":15.721847,"lon":120.808833,"sm":985,"fm":985,"tm":985,"am":1534,"md":22.28,"ls":"outside","ww":"Baket-Baket","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package C","dup":[],"run":[],"cl":[],"L":"records","s":74,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.95,"value":22.28,"text":"The pin is 22.3 km outside Moncada, Tarlac, the nearest municipality the record claims. It falls in Talugtug, Nueva Ecija.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":37},{"i":2167,"cid":"22CF0089","pid":"P00637075LZ","t":"Rehabilitation of Pampanga River Flood Control, Barangay Tabuating, San Leonardo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN LEONARDO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"E.D. LIBUNAO CONSTRUCTION & TRADING","c":38213807.11,"abc":39199931.37,"fy":"2022","sd":"04/04/2022","cd":"2022-07-12","lat":15.3661,"lon":120.9263,"sm":1316,"fm":1316,"tm":1316,"am":1316,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.16,"wp":[15.36468,120.92622],"wst":"matched","br":"Tabuating","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1669},{"i":2168,"cid":"24CC0025","pid":"P00838373LZ","t":"Construction of Riverbank Protection Structure (Phase IV) at Barangay San Roque, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":72374388.95,"abc":72374963.73,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.999409,"lon":120.883509,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":"Phase IV","dup":[],"run":[2850,2897],"cl":[2265,2837,2840,2848,2850,2852,2880,2883,2897],"L":"field","s":51,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0023 to 24CC0025) cover the same site, together worth PHP 265,373,515.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":93},{"i":2169,"cid":"24PF0023","pid":"P00820736LZ","t":"Construction of Baguyos CIS Flood Control Structure along Baguyos Creek, Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"MANKAYAN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"LAYAD GENERAL ENGINEERING CONSTRUCTION AND AGGREGATES","c":14691603.0,"abc":14700000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-06-19","lat":16.917344,"lon":120.768706,"sm":921,"fm":921,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":"Baguyos","wn":"Baguyos River","wd":0.77,"wp":[16.91462,120.76209],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1670},{"i":2170,"cid":"23CC0246","pid":"P00742151LZ","t":"Construction of Flood Mitigation Structures along Bgry. Sto. Nino, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":69299784.14,"abc":69299888.11,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.842895,"lon":120.809143,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1671},{"i":2171,"cid":"24CC0002","pid":"P00838374LZ","t":"Construction of Riverbank Protection Structure along Balagtas River (Phase II), Barangay Pulong Gubat, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499114.57,"abc":96499945.03,"fy":"2024","sd":"02/07/2024","cd":"2024-11-18","lat":14.865851,"lon":120.917,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.89,"wp":[14.85923,120.92175],"wst":"matched","br":"Pulong Gubat","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1672},{"i":2172,"cid":"24CC0035","pid":"P00838418LZ","t":"Construction of Riverbank Protection Structure at Barangay Tilapayong, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96498805.78,"abc":96499834.68,"fy":"2024","sd":"02/07/2024","cd":"2024-10-29","lat":14.97109,"lon":120.883745,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tilapayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1673},{"i":2173,"cid":"23CC0243","pid":"P00742155LZ","t":"Construction of Flood Mitigation Structures along Bgry. Masile, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":79197823.4,"abc":79199623.63,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.78299,"lon":120.810472,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1674},{"i":2174,"cid":"24CC0014","pid":"P00838398LZ","t":"Construction of Riverbank Protection Structure at Barangay Iba-Ibayo, Hagonoy, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"HAGONOY (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77197558.67,"abc":77199993.32,"fy":"2024","sd":"02/07/2024","cd":"2024-10-03","lat":14.871714,"lon":120.770278,"sm":612,"fm":612,"tm":612,"am":612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iba-Ibayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1675},{"i":2175,"cid":"21OA0005","pid":"P00525712LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 10), Brgy. Dampalit, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"JUSTBILT BUILDERS","c":34790000.0,"abc":34789361.0,"fy":"2021","sd":"03/24/2022","cd":"2022-09-19","lat":14.691779,"lon":120.926356,"sm":399,"fm":null,"tm":399,"am":409,"md":0.29,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.03,"wp":[14.69158,120.92618],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 10","dup":[],"run":[2347,2400,2228],"cl":[2120,2130,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (21OA0002 to 21OA0005) cover the same site, together worth PHP 139,160,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":86},{"i":2176,"cid":"23PI0072","pid":"P00727403LZ","t":"Construction of Flood Control Mitigation Structure, Sao-Malitep along Chico River, Balili, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"JBA CONSTRUCTION AND BUILDERS","c":49000000.0,"abc":48999999.5,"fy":"2023","sd":"05/24/2023","cd":"2023-10-14","lat":17.041944,"lon":120.936111,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.04,"wp":[17.04218,120.93639],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1676},{"i":2177,"cid":"22DG0032","pid":"P00620573LZ","t":"Construction of Flood Control Structures along Alemang River (Naic Diversion Bridge), Naic, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NAIC (CAVITE)","deo":"Cavite 2nd District Engineering Office","co":"HAUSLAND CONSTRUCTION","c":32073418.52,"abc":32835021.45,"fy":"2022","sd":"03/14/2022","cd":"2022-08-01","lat":14.315581,"lon":120.770641,"sm":1009,"fm":1009,"tm":1009,"am":1009,"md":0.0,"ls":"inside","ww":"Alemang","wn":"Alemang River","wd":0.0,"wp":[14.31558,120.77064],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1677},{"i":2178,"cid":"22DQ0058","pid":"P00631296LZ","t":"Construction of Revetment along Bacoor River, Brgy. Mabolo II, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":55858753.16,"abc":55859954.92,"fy":"2022","sd":"04/07/2022","cd":"2022-11-07","lat":14.45423,"lon":120.93617,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.0,"wp":[14.45427,120.93615],"wst":"matched","br":"Mabolo II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1678},{"i":2179,"cid":"23C00159","pid":"P00726890LZ","t":"Construction of Slope Protection Works at Malasik River (Barangca Section) Barangay Barangca, Candaba, Pampanga.","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":144750000.0,"abc":144749227.0,"fy":"2023","sd":"08/21/2023","cd":"2024-05-16","lat":15.124173,"lon":120.917177,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barangca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1679},{"i":2180,"cid":"23CF0091","pid":"P00727303LZ","t":"Construction of Flood Control Structure along Peñaranda River, Barangay San Nicolas, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"ITP CONSTRUCTION, INC. / PAN AQUARIUS CONSTRUCTION AND DEVELOPMENT CORPORATION","c":96499840.4,"abc":96499990.95,"fy":"2023","sd":"04/03/2023","cd":"2023-09-19","lat":15.30835,"lon":120.92659,"sm":386,"fm":386,"tm":386,"am":1286,"md":0.13,"ls":"boundary","ww":"Peñaranda","wn":"Peñaranda River","wd":0.07,"wp":[15.30885,120.92701],"wst":"matched","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1680},{"i":2181,"cid":"24CC0172","pid":"P00843305LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay Catulinan, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GLOBALCRETE BUILDERS INC.","c":77199553.69,"abc":77199926.2,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.971157,"lon":120.883807,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catulinan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1681},{"i":2182,"cid":"23OA0041","pid":"P00726995LZ","t":"Construction of B. Caseñas Pumping Station, Brgy. Tangos North, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":22560205.05,"abc":23265138.75,"fy":"2023","sd":"03/08/2023","cd":"2024-11-21","lat":14.674628,"lon":120.936228,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1682},{"i":2183,"cid":"24CC0186","pid":"P00823359LZ","t":"Construction/Improvement of Flood Mitigation Structure at Sapang Bayan, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":67547497.79,"abc":67549855.79,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.916437,"lon":120.77082,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1683},{"i":2184,"cid":"22CC0264","pid":"P00639473LZ","t":"Rehabilitation of Balagtas River Control Structure, Sta. 00+000 to Sta. 00+392, Brgy. Pulong Gubat, Balagtas, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48997800.81,"abc":48999538.61,"fy":"2022","sd":"04/04/2022","cd":"2023-01-28","lat":14.863113,"lon":120.917329,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.64,"wp":[14.85923,120.92175],"wst":"matched","br":"Pulong Gubat","len":392.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1684},{"i":2185,"cid":"24CC0394","pid":"P00843318LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Caliligawan, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":72366243.51,"abc":72374675.3,"fy":"2024","sd":"04/23/2024","cd":"2024-06-24","lat":14.768374,"lon":120.810665,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caliligawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1685},{"i":2186,"cid":"24CC0075","pid":"P00821263LZ","t":"Construction of Riverbank Protection Structure along Angat River (Phase II), Barangay Tilapayong, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BELL CONSTRUCTION","c":72374160.68,"abc":72374961.51,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.971105,"lon":120.883813,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":2.99,"wp":[14.95502,120.90614],"wst":"matched","br":"Tilapayong","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1686},{"i":2187,"cid":"23OA0082","pid":"P00725570LZ","t":"Construction of Dampalit Pumping Station (Phase 2), Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":134190886.8,"abc":134185393.7,"fy":"2023","sd":"03/28/2023","cd":"2024-03-21","lat":14.686234,"lon":120.936367,"sm":399,"fm":399,"tm":399,"am":409,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1687},{"i":2188,"cid":"23OA0013","pid":"P00725922LZ","t":"Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49000000.0,"abc":48997939.44,"fy":"2023","sd":"02/15/2023","cd":"2023-05-22","lat":14.70072,"lon":120.926673,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 3","dup":[],"run":[2741,2120],"cl":[2120,2130,2175,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OA0013 to 23OA0015) cover the same site, together worth PHP 147,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":46},{"i":2189,"cid":"23CC0140","pid":"P00736007LZ","t":"Construction of Revetment at Pamarawan, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":28946436.68,"abc":28949433.03,"fy":"2023","sd":"02/13/2023","cd":"2023-10-10","lat":14.757816,"lon":120.810778,"sm":401,"fm":401,"tm":401,"am":401,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1688},{"i":2190,"cid":"22CC0182","pid":"P00639469LZ","t":"Construction of Flood Control Structure and Improvement of Waterways at Brgy. Sulivan, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999405.84,"abc":48999297.77,"fy":"2022","sd":"04/05/2022","cd":"2023-01-26","lat":14.983649,"lon":120.883859,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[],"run":[],"cl":[2159,2271,2311,2381,2391,2402,2419,2462,2463,2899],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":986},{"i":2191,"cid":"22DE0060","pid":"P00632868LZ","t":"Construction of Seawall, Municipality of Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-07-30","lat":13.734083,"lon":120.936385,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1689},{"i":2192,"cid":"22CF0104","pid":"P00621417LZ","t":"Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins- Construction of Flood Control Mitigation Structure along Pampanga River, Barangay Magsalisi, Jaen, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"JAEN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":62301773.29,"abc":72374963.74,"fy":"2022","sd":"04/07/2022","cd":"2023-02-24","lat":15.379159,"lon":120.917385,"sm":659,"fm":659,"tm":659,"am":659,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[15.37873,120.91778],"wst":"matched","br":"Magsalisi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1690},{"i":2193,"cid":"23CC0228","pid":"P00740331LZ","t":"Construction of Revetment along Kalero River at Barangay Calero, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":72374406.26,"abc":72374649.03,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.829967,"lon":120.810939,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Kalero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1691},{"i":2194,"cid":"23CG0224","pid":"P00740603LZ","t":"Rehabilitation of Drainage Canal at Santiago, San Juan and Sta. Maria, Sta Ana, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTA ANA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"THREE-IN-ONE CONSTRUCTION & TRADING","c":13957614.2,"abc":14700000.0,"fy":"2023","sd":"07/05/2023","cd":"2024-02-19","lat":15.107995,"lon":120.771045,"sm":1368,"fm":1368,"tm":1368,"am":1368,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1692},{"i":2195,"cid":"23C00196","pid":"P00744233LZ","t":"Construction of Flood Control Structure at Galas Maasim Creek along Bypass road Phase I, Maasim, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":96498885.9,"abc":96499964.52,"fy":"2023","sd":"06/20/2023","cd":"2024-03-15","lat":15.03544,"lon":120.936445,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Galas Maasim","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[2198],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,998,349.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":743},{"i":2196,"cid":"24CC0046","pid":"P00839475LZ","t":"Construction of Riverbank Protection Structure at Barangay Catulinan, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":98999220.54,"abc":98999833.32,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.969077,"lon":120.883865,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catulinan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1693},{"i":2197,"cid":"22CG0147","pid":"P00639362LZ","t":"Improvement of Canal System and Service Road of PDRIS, Sta. Ana, Pampanga","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTA ANA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93122497.85,"abc":96500000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-03-30","lat":15.109791,"lon":120.771495,"sm":1368,"fm":1368,"tm":1368,"am":1368,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1694},{"i":2198,"cid":"23C00197","pid":"P00744234LZ","t":"Construction of Flood Control Structure at Galas Maasim Creek along Bypass road Phase II, Maasim, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":96499463.56,"abc":96499964.52,"fy":"2023","sd":"06/20/2023","cd":"2024-05-14","lat":15.03544,"lon":120.936445,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Galas Maasim","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[2195],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,998,349.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":744},{"i":2199,"cid":"23CC0322","pid":"P00740346LZ","t":"Construction of Flood Control Structure along Bocaue River, Barangay Bambang, Bocaue, Bulacan (K011+490 to K011+640)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":72374656.27,"abc":72374745.82,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.771548,"lon":120.926677,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1695},{"i":2200,"cid":"23CC0242","pid":"P00740363LZ","t":"Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Masile, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96497317.65,"abc":96499571.86,"fy":"2023","sd":"03/28/2023","cd":"2023-12-11","lat":14.784707,"lon":120.811018,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Calero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Masile","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1696},{"i":2201,"cid":"21CC0292","pid":"P00525568LZ","t":"Construction of Flood Control Structures along Bocaue River, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Bocaue","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96499940.4,"abc":96499775.9,"fy":"2021","sd":"01/28/2022","cd":"2023-01-22","lat":14.901418,"lon":120.771832,"sm":216,"fm":null,"tm":216,"am":310,"md":18.35,"ls":"outside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.92,"value":18.35,"text":"The pin is 18.4 km outside Bocaue, Bulacan, the nearest municipality the record claims. It falls in Calumpit, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":112},{"i":2202,"cid":"23OA0070","pid":"P00725491LZ","t":"Construction of Pumping Station in Batasan River (Phase 1), Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96500000.0,"abc":96487124.65,"fy":"2023","sd":"02/23/2023","cd":"2024-02-17","lat":14.68626,"lon":120.936497,"sm":399,"fm":399,"tm":399,"am":409,"md":0.09,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.04,"wp":[14.686,120.93629],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1697},{"i":2203,"cid":"24CC0004","pid":"P00838377LZ","t":"Construction of Riverbank Protection Structure along Balagtas River, Barangay Pulong Gubat, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499907.13,"abc":96499972.77,"fy":"2024","sd":"02/07/2024","cd":"2024-12-02","lat":14.864923,"lon":120.917461,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.78,"wp":[14.85923,120.92175],"wst":"matched","br":"Pulong Gubat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1698},{"i":2204,"cid":"23CF0019","pid":"P00727299LZ","t":"Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 40+300.00-Sta. 40+634.70, Barangay Sto. Tomas South, Jaen, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"JAEN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"ITP CONSTRUCTION, INC.","c":72374624.95,"abc":72374949.98,"fy":"2023","sd":"03/29/2023","cd":"2023-12-14","lat":15.36421,"lon":120.9268,"sm":659,"fm":659,"tm":659,"am":659,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[15.36465,120.92682],"wst":"matched","br":"Sto. Tomas South","len":334.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1699},{"i":2205,"cid":"22CC0018","pid":"P00631195LZ","t":"Construction of Flood Mitigation Structure at Barangay Masile, City of Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":34299237.64,"abc":34299947.39,"fy":"2022","sd":"01/28/2022","cd":"2022-07-26","lat":14.78534,"lon":120.811068,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masile","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1700},{"i":2206,"cid":"24CC0022","pid":"P00838416LZ","t":"Construction of Riverbank Protection Structure at Barangay Sapang Bayan, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199865.91,"abc":77199984.79,"fy":"2024","sd":"02/07/2024","cd":"2024-03-18","lat":14.916399,"lon":120.772214,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1701},{"i":2207,"cid":"23CC0096","pid":"P00726477LZ","t":"Construction of River Control Project along Guiguinto River, Barangay Daungan, Sta. 02+690 to Sta. 03+050, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96498376.03,"abc":96499351.52,"fy":"2023","sd":"02/13/2023","cd":"2023-10-11","lat":14.853853,"lon":120.883929,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.66,"wp":[14.85018,120.87911],"wst":"matched","br":"Daungan","len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1702},{"i":2208,"cid":"24CC0005","pid":"P00838376LZ","t":"Construction of Riverbank Protection Structure along Balagtas River, Barangay Dalig, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":96499605.25,"abc":96499903.14,"fy":"2024","sd":"02/07/2024","cd":"2025-01-31","lat":14.832399,"lon":120.926831,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.8323,120.92698],"wst":"matched","br":"Dalig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1703},{"i":2209,"cid":"23CC0005","pid":"P00736612LZ","t":"Construction of Flood Mitigation Structures along Barangay Babatnin, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":48999995.09,"abc":48999797.63,"fy":"2023","sd":"02/06/2023","cd":"2023-07-03","lat":14.785845,"lon":120.811132,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Babatnin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1704},{"i":2210,"cid":"23OA0059","pid":"P00742225LZ","t":"Rehabilitation of Riverwall along Tangos River (Phase 9), Navotas City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":19799811.0,"abc":19793401.75,"fy":"2023","sd":"03/27/2023","cd":"2023-10-22","lat":14.674559,"lon":120.936585,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Tangos","wn":"Tangos River","wd":0.03,"wp":[14.67483,120.93673],"wst":"matched","br":null,"len":null,"ph":"Phase 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1705},{"i":2211,"cid":"22PA0042","pid":"P00632766LZ","t":"Construction of Lingey Flood Control Structure, Barangay Lingey, Bucloc, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"BUCLOC (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497342.0,"abc":48999807.43,"fy":"2022","sd":"04/13/2022","cd":"2022-11-03","lat":17.444401,"lon":120.884048,"sm":236,"fm":236,"tm":236,"am":236,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lingey","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":745},{"i":2212,"cid":"21CC0257","pid":"P00561530LZ","t":"Rehabilitation/ Improvement with Revetment along Malolos River, Catmon to Caingin, Malolos, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"City of Malolos","deo":"Bulacan 1st District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":48998928.29,"abc":48999916.72,"fy":"2021","sd":"01/14/2022","cd":"2022-09-10","lat":14.843949,"lon":120.811377,"sm":401,"fm":null,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Malolos","wn":"Malolos River","wd":0.0,"wp":[14.84394,120.81138],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1706},{"i":2213,"cid":"21CC0200","pid":"P00561692LZ","t":"Construction of Flood Mitigation Structure along Barangay Angat River, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Calumpit","deo":"Bulacan 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":24749752.99,"abc":24749152.7,"fy":"2021","sd":"01/10/2022","cd":"2022-08-19","lat":14.902651,"lon":120.773496,"sm":310,"fm":null,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":"Barangay Angat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Angat River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1707},{"i":2214,"cid":"24CC0262","pid":"P00843301LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Kalero River and its tributaries, Barangay Calero, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":72374715.15,"abc":72374757.99,"fy":"2024","sd":"04/02/2024","cd":"2024-11-27","lat":14.82915,"lon":120.811876,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Kalero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1708},{"i":2215,"cid":"23CG0077","pid":"P00742342LZ","t":"Rehabilitation Of Channel And Construction Of Concrete Slope Protection Using Steel Pile Foundation Of Sapang Patad At Barangay San Jose, San Simon, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN SIMON (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"V. TRILLANA BUILDERS & TRADING","c":21585947.35,"abc":22747230.0,"fy":"2023","sd":"04/04/2023","cd":"2023-08-31","lat":14.994236,"lon":120.773681,"sm":1359,"fm":1359,"tm":1359,"am":1359,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1709},{"i":2216,"cid":"24CC0049","pid":"P00838403LZ","t":"Construction of Riverbank Protection Structure at Barangay Manatal, Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96499585.89,"abc":96499919.67,"fy":"2024","sd":"02/07/2024","cd":"2024-10-30","lat":14.864055,"lon":120.917553,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manatal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1710},{"i":2217,"cid":"23OA0049","pid":"P00726810LZ","t":"Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AZUL BUILDERS","c":62725000.0,"abc":62719579.2,"fy":"2023","sd":"03/22/2023","cd":"2024-02-14","lat":14.682782,"lon":120.936608,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tanza","wn":"Tanza River","wd":0.02,"wp":[14.68271,120.93643],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[2230,2291,2337,2398],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OA0049 to 23OA0053) cover the same site, together worth PHP 313,625,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":409},{"i":2218,"cid":"22CC0113","pid":"P00632817LZ","t":"Construction of Flood Control Structures (Revetment) along Bocaue River, Barangay Binang 2nd, Bocaue, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.G. FRANCISCO CONSTRUCTION","c":49499410.85,"abc":49499531.19,"fy":"2022","sd":"01/28/2022","cd":"2022-09-24","lat":14.802581,"lon":120.926869,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Binang 2nd","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1711},{"i":2219,"cid":"22CF0107","pid":"P00621577LZ","t":"Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins- Construction of Flood Control Mitigation Structure along Peñaranda River, Barangay San Roque, San Leonardo, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN LEONARDO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":63067150.72,"abc":72374957.23,"fy":"2022","sd":"04/11/2022","cd":"2022-12-30","lat":15.314285,"lon":120.917753,"sm":1316,"fm":1316,"tm":1316,"am":1316,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.09,"wp":[15.31358,120.91815],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1712},{"i":2220,"cid":"24CG0003","pid":"P00820280LZ","t":"Rehabilitation of Eroded Pampanga River Bank at Lacquioz, Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":93604758.63,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-05","lat":15.169628,"lon":120.775094,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[2268,2650],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CG0001 to 24CG0003) cover the same site, together worth PHP 276,542,532.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":321},{"i":2221,"cid":"24OA0022","pid":"P00820523LZ","t":"Construction of Ablola Pumping Station, Barangay Tangos North, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999201.71,"abc":48995077.58,"fy":"2024","sd":"02/12/2024","cd":"2025-03-17","lat":14.674238,"lon":120.936834,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1713},{"i":2222,"cid":"23CC0157","pid":"P00726470LZ","t":"Construction of Riverwall at Barangay Pagala, Sta. 00+910 to Sta. 01+310, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96499500.7,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":14.969211,"lon":120.884052,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":400.0,"ph":null,"dup":[],"run":[],"cl":[2247,2275,2301,2324,2331,2553,2585,2635],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":954},{"i":2223,"cid":"23CC0316","pid":"P00742328LZ","t":"Construction of Flood Control Project and Rehabilitation of Waterways along Bocaue River Brgy. Bambang Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":74249977.42,"abc":74249585.35,"fy":"2023","sd":"03/27/2023","cd":"2023-11-08","lat":14.77025,"lon":120.926966,"sm":216,"fm":216,"tm":248,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bambang Bocaue","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1714},{"i":2224,"cid":"23DB0090","pid":"P00726930LZ","t":"Construction of Flood Control Structure along Pansipit River, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"515 LIFE CONSTRUCTION CORP. / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-03-07","lat":13.88424,"lon":120.9178,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":"Pansipit","wn":"Pansipit River","wd":0.01,"wp":[13.8843,120.91791],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1715},{"i":2225,"cid":"21EB0087","pid":"P00561807LZ","t":"Construction of Sabang River Protection Dike, Barangay Buenavista, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Sablayan","deo":"Mindoro Occidental District Engineering Office","co":"JRMX CONSTRUCTION & GENERAL MERCHANDISE","c":29255752.25,"abc":29700000.0,"fy":"2021","sd":"03/25/2021","cd":"2022-11-30","lat":12.84519,"lon":120.775777,"sm":1228,"fm":null,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Sabang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1716},{"i":2226,"cid":"24CC0034","pid":"P00838393LZ","t":"Construction of Riverbank Protection Structure at Barangay Calero, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77197885.27,"abc":77199990.41,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.829115,"lon":120.811879,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1717},{"i":2227,"cid":"23CC0280","pid":"P00742327LZ","t":"Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Parulan Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":74249103.11,"abc":73499946.25,"fy":"2023","sd":"03/27/2023","cd":"2023-12-21","lat":14.900144,"lon":120.884081,"sm":1152,"fm":1152,"tm":248,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.33,"wp":[14.90316,120.88403],"wst":"matched","br":"Parulan Plaridel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.5,"text":"The record contradicts itself: the municipality field and the pin point to Plaridel, Bulacan, but the title names Bulacan, Bulacan, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01019,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":215},{"i":2228,"cid":"21OA0004","pid":"P00525711LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 9), Brgy. Dampalit, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":34790000.0,"abc":34789759.78,"fy":"2021","sd":"03/24/2022","cd":"2022-09-19","lat":14.691501,"lon":120.92698,"sm":399,"fm":null,"tm":399,"am":409,"md":0.27,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.04,"wp":[14.69118,120.9269],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 9","dup":[],"run":[2347,2400,2175],"cl":[2120,2130,2175,2188,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (21OA0002 to 21OA0005) cover the same site, together worth PHP 139,160,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":87},{"i":2229,"cid":"23CC0225","pid":"P00740350LZ","t":"Construction of Flood Control Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan (K001+870 to K002+068)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":72373876.28,"abc":72374293.86,"fy":"2023","sd":"03/28/2023","cd":"2023-12-04","lat":14.86106,"lon":120.9179,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.46,"wp":[14.85923,120.92175],"wst":"matched","br":"Santol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1718},{"i":2230,"cid":"23OA0050","pid":"P00726811LZ","t":"Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AZUL BUILDERS","c":62725000.0,"abc":62717848.6,"fy":"2023","sd":"03/22/2023","cd":"2024-02-14","lat":14.681791,"lon":120.937212,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tanza","wn":"Tanza River","wd":0.02,"wp":[14.68165,120.93703],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[2217,2291,2337,2398],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OA0049 to 23OA0053) cover the same site, together worth PHP 313,625,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":410},{"i":2231,"cid":"22CE0092","pid":"P00620531LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. San Eustacio, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":45080000.0,"abc":45080000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-22","lat":15.513639,"lon":120.812079,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.03,"wp":[15.51377,120.81189],"wst":"matched","br":"San Eustacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1719},{"i":2232,"cid":"23DF0034","pid":"P00737501LZ","t":"Construction of Drainage System in Barangay San Antonio I, Noveleta, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4897964.42,"abc":4950000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-05-19","lat":14.421728,"lon":120.884181,"sm":1026,"fm":1026,"tm":1026,"am":1026,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1720},{"i":2233,"cid":"22AI0074","pid":"P00620977LZ","t":"Construction of Flood Control Structure along Viray River, Brgy. Burgos, Natividad, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"NATIVIDAD (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":47532817.01,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-09-03","lat":16.02533,"lon":120.7764,"sm":1015,"fm":1015,"tm":1015,"am":1015,"md":0.0,"ls":"inside","ww":"Viray","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Burgos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1721},{"i":2234,"cid":"23PI0032","pid":"P00727402LZ","t":"Construction of Balili Flood Control, Sta. 39 + 550 - Sta. 39 + 830 (LS); Sta. 40 + 120 - Sta 40 + 270 (LS) along Chico River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"CHAO-MING CONSTRUCTION SERVICES / E.T. LATAWAN CONSTRUCTION","c":39200000.0,"abc":39199999.6,"fy":"2023","sd":"02/27/2023","cd":"2023-09-27","lat":17.05279,"lon":120.93725,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.0527,120.93756],"wst":"matched","br":null,"len":430.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1722},{"i":2235,"cid":"24DB0024","pid":"P00820322LZ","t":"Construction of Flood Control Structure at Calaca Bridge, Calaca River, City of Calaca, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF CALACA (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"FRANDEL CONSTRUCTION AND DEVELOPMENT CORP. / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":49117535.0,"abc":49117535.0,"fy":"2024","sd":"02/14/2024","cd":"2024-12-12","lat":13.919544,"lon":120.812185,"sm":292,"fm":292,"tm":292,"am":292,"md":0.0,"ls":"inside","ww":"Calaca","wn":"Calaca River","wd":0.13,"wp":[13.91996,120.81101],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1723},{"i":2236,"cid":"24CC0403","pid":"P00845811LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Pulo To Purok 6), Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999012.87,"abc":98999770.49,"fy":"2024","sd":"04/23/2024","cd":"2025-01-17","lat":14.76567,"lon":120.917923,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1724},{"i":2237,"cid":"23AA0119","pid":"P00726353LZ","t":"Construction of Flood Mitigating Structures and Facilities along Principal River and Tributaries, Upstream Spillway, Barangay Isic-Isic, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":77199999.99,"abc":78399767.14,"fy":"2023","sd":"03/13/2023","cd":"2023-10-12","lat":18.395972,"lon":120.776967,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Principal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Isic-Isic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1725},{"i":2238,"cid":"21PF0031","pid":"P00525910LZ","t":"Construction of Bulalacao Flood Control Sta. 1+149 - Sta. 1+511 (B.S.), Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Mankayan","deo":"Benguet 2nd District Engineering Office","co":"TIMENCLEAN BUILDERS AND AGGREGATES","c":9505756.45,"abc":9800000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-12-08","lat":16.836828,"lon":120.812347,"sm":921,"fm":null,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":362.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1726},{"i":2239,"cid":"24OA0005","pid":"P00820528LZ","t":"Construction of Box Culvert along Judge Roldan St. (Phase 2), Barangay San Roque, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":6858007.76,"abc":6859359.22,"fy":"2024","sd":"02/12/2024","cd":"2024-06-10","lat":14.66999,"lon":120.937304,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1727},{"i":2240,"cid":"23CC0024","pid":"P00737457LZ","t":"Construction of Flood Control Structures along Bocaue River, Poblacion, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TIONGCO MENDOZA CONSTRUCTION CO. INC.","c":19798050.14,"abc":19799705.53,"fy":"2023","sd":"02/06/2023","cd":"2023-05-17","lat":14.7983,"lon":120.927073,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1728},{"i":2241,"cid":"23CC0042","pid":"P00737460LZ","t":"Construction of Flood Control Structure along Guiguinto River, Daungan, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"D.C. SANDIL CONSTRUCTION AND REALTY DEVELOPMENT, I","c":19799558.46,"abc":19799614.68,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.85383,"lon":120.88427,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.69,"wp":[14.85018,120.87911],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1729},{"i":2242,"cid":"24CK0050","pid":"P00821308LZ","t":"Rehabilitation of Existing Dike along Rio Chico River, (Castillo Section, Right Bank), Phase 2, Sta. (-) 1+337.20 to Sta. (-) 1+737.60, Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY)","c":96497131.99,"abc":96499377.51,"fy":"2024","sd":"02/20/2024","cd":"2024-10-10","lat":15.2813,"lon":120.777056,"sm":448,"fm":448,"tm":448,"am":1256,"md":2.99,"ls":"adjacent","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.28124,120.77711],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[1877,1868],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CK0048 to 24CK0050) cover the same site, together worth PHP 289,492,221.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":261},{"i":2243,"cid":"23C00328","pid":"P00744261LZ","t":"Construction of Flood Control Structure Along Maasim River, Bgy Maasim, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":9899493.31,"abc":9899955.33,"fy":"2023","sd":"11/24/2023","cd":"2024-03-22","lat":15.039808,"lon":120.937405,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.59,"wp":[15.03992,120.93193],"wst":"matched","br":"Maasim","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1730},{"i":2244,"cid":"23CC0208","pid":"P00740588LZ","t":"Construction of River Protection along Balagtas River, K001 + 260 to K001 + 460, barangay Pulong Gubat, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48999814.12,"abc":48999952.69,"fy":"2023","sd":"03/21/2023","cd":"2023-12-04","lat":14.862872,"lon":120.917982,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.57,"wp":[14.85923,120.92175],"wst":"matched","br":"Pulong Gubat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1731},{"i":2245,"cid":"23CC0306","pid":"P00742321LZ","t":"Construction of Drainage Canal Barangay Poblacion, Bocaue, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:LARSEN-DUTCHER CONSTRACTOR)","c":4944925.2,"abc":4949581.45,"fy":"2023","sd":"03/27/2023","cd":"2023-07-14","lat":14.795552,"lon":120.927145,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1732},{"i":2246,"cid":"22CE0084","pid":"P00632834LZ","t":"Construction of Slope Protection/Concrete Lining of Malayop Creek, Barangay Dulong Bayan, Quezon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-12-18","lat":15.554833,"lon":120.812624,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Malayop","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dulong Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1733},{"i":2247,"cid":"23CC0252","pid":"P00740334LZ","t":"Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K003+161 to K003+461)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":71915112.64,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-06","lat":14.976819,"lon":120.884298,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2275,2301,2324,2331,2553,2585,2635],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1013},{"i":2248,"cid":"24CF0025","pid":"P00825088LZ","t":"Construction of Flood Control Structure along Peñaranda River, Barangay Santo Niño, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":96499860.47,"abc":96499940.57,"fy":"2024","sd":"04/02/2024","cd":"2024-06-18","lat":15.30578,"lon":120.93751,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.2,"wp":[15.3076,120.93728],"wst":"matched","br":"Santo Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1734},{"i":2249,"cid":"23CC0107","pid":"P00740371LZ","t":"Construction of Flood Mitigation Structures along Barangay Pinalagdan, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77194184.92,"abc":77199910.16,"fy":"2023","sd":"03/28/2023","cd":"2023-08-09","lat":14.82936,"lon":120.777419,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinalagdan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1735},{"i":2250,"cid":"23DF0015","pid":"P00726215LZ","t":"Construction of Revetment along Cañas River, Barangay Paradahan, Phase I, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-11-30","lat":14.321403,"lon":120.884439,"sm":1548,"fm":1548,"tm":1548,"am":387,"md":1.65,"ls":"adjacent","ww":"Cañas","wn":"Cañas River","wd":1.66,"wp":[14.32554,120.86966],"wst":"matched","br":"Paradahan","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1736},{"i":2251,"cid":"22CF0103","pid":"P00621416LZ","t":"Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins- Construction of Flood Control Mitigation Structure along Pampanga River, Barangay Magpapalayok, San Leonardo, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN LEONARDO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":63054123.04,"abc":72374991.52,"fy":"2022","sd":"04/11/2022","cd":"2023-02-28","lat":15.3797,"lon":120.918,"sm":1316,"fm":1316,"tm":1316,"am":659,"md":0.06,"ls":"boundary","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[15.37924,120.91836],"wst":"matched","br":"Magpapalayok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1737},{"i":2252,"cid":"24OA0033","pid":"P00820542LZ","t":"Construction of Flood Mitigation Structure, Dampalit Riverwall (Phase 8), Barangay Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":48998274.82,"abc":48999376.86,"fy":"2024","sd":"02/12/2024","cd":"2024-10-08","lat":14.700942,"lon":120.927159,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 8","dup":[],"run":[2322,2130],"cl":[2120,2130,2175,2188,2228,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":57,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0032 to 24OA0034) cover the same site, together worth PHP 146,998,200.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":62},{"i":2253,"cid":"22DB0097","pid":"P00642359LZ","t":"Rehabilitation of Slope Protection of Calaca Bridge, Calaca River, Calaca, Batangas","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF CALACA (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"X.Y.Z. CONSTRUCTION & SUPPLIES / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-22","lat":13.927044,"lon":120.813292,"sm":292,"fm":292,"tm":292,"am":292,"md":0.0,"ls":"inside","ww":"Calaca","wn":"Calaca River","wd":0.03,"wp":[13.92681,120.81351],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1738},{"i":2254,"cid":"23OA0068","pid":"P00742224LZ","t":"Construction of Box Culvert (from Gov. Pascual to Judge Roldan), San Roque, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":17819581.35,"abc":17819774.75,"fy":"2023","sd":"03/27/2023","cd":"2023-11-24","lat":14.670113,"lon":120.937519,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1739},{"i":2255,"cid":"24OA0015","pid":"P00820553LZ","t":"Construction of Riverwall along Tangos River (Phase 2), Navotas City","w":"Construction of Revetment","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":49000000.0,"abc":48993207.97,"fy":"2024","sd":"02/12/2024","cd":"2024-09-11","lat":14.674017,"lon":120.937541,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Tangos","wn":"Tangos River","wd":0.03,"wp":[14.67424,120.93769],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1740},{"i":2256,"cid":"23CC0130","pid":"P00726467LZ","t":"Construction of Riverwall at Barangay Piel, Sta. 01+410 to Sta. 01+810, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96498956.85,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-11-10","lat":14.984411,"lon":120.884624,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":400.0,"ph":null,"dup":[],"run":[2105,2336],"cl":[2105,2336,2630,2856,2860,2861,2874,2881,2890,2893],"L":"field","s":55,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0129 to 23CC0131) cover the same site, together worth PHP 289,497,821.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":73},{"i":2257,"cid":"23DE0040","pid":"P00740397LZ","t":"Construction of Flood Control Structure, Brgy. Bagong Tubig, San Luis, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":22195000.0,"abc":22540000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-12-13","lat":13.837222,"lon":120.918056,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Tubig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1741},{"i":2258,"cid":"21AA0083","pid":"P00526253LZ","t":"Construction/Rehabilitation of Flood Control Revetment along Bolo River, Barangay Tarrag, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Pagudpud","deo":"Ilocos Norte 1st District Engineering Office","co":"BLUE MOUNTAIN BUILDERS & GENERAL MDSE.(FOR. BLUE M","c":81059849.91,"abc":81059850.65,"fy":"2021","sd":"12/24/2021","cd":"2022-07-15","lat":18.543375,"lon":120.778896,"sm":1062,"fm":null,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Bolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tarrag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1742},{"i":2259,"cid":"23CD0055","pid":"P00727361LZ","t":"Rehabilitation of Pumping Stations at Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":14479247.66,"abc":14699743.82,"fy":"2023","sd":"03/13/2023","cd":"2023-04-30","lat":14.7074,"lon":120.9376,"sm":1032,"fm":1032,"tm":248,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.16,"text":"The record contradicts itself: the municipality field and the pin point to Obando, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":603},{"i":2260,"cid":"22AI0121","pid":"P00637051LZ","t":"Construction of Slope Protection Works along Matablang Creek, Brgys. Rajal and Esmeralda, Balungao, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"BALUNGAO (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":24474875.68,"abc":24500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-10","lat":15.8917,"lon":120.8136,"sm":140,"fm":140,"tm":140,"am":1613,"md":8.95,"ls":"outside","ww":"Matablang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":8.95,"text":"The pin is 8.9 km outside Balungao, Pangasinan, the nearest municipality the record claims. It falls in Umingan, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":287},{"i":2261,"cid":"23DQ0032","pid":"P00726556LZ","t":"Construction of Revetment along Imus River, Barangay Sineguelasan, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96479788.33,"abc":96499968.82,"fy":"2023","sd":"03/08/2023","cd":"2024-01-31","lat":14.45834,"lon":120.9273,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.05,"wp":[14.45799,120.92709],"wst":"matched","br":"Sineguelasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1743},{"i":2262,"cid":"24CE0119","pid":"P00823426LZ","t":"Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Santa Lucia Old, Zaragoza, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ZARAGOZA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"M.M. SERRANO CONSTRUCTION COMPANY","c":95534900.78,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-25","lat":15.485499,"lon":120.779443,"sm":1644,"fm":1644,"tm":1644,"am":785,"md":0.01,"ls":"boundary","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.48563,120.77936],"wst":"matched","br":"Santa Lucia Old","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1744},{"i":2263,"cid":"24CC0020","pid":"P00838413LZ","t":"Construction of Riverbank Protection Structure at Barangay San Vicente, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199461.62,"abc":77199993.42,"fy":"2024","sd":"02/07/2024","cd":"2024-07-04","lat":14.844878,"lon":120.813777,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1745},{"i":2264,"cid":"22CD0153","pid":"P00621536LZ","t":"Improvement of Waterway along Bulo River, Sta. 01 + 880 - Sta. 02 + 320 (Left Side), San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48995909.06,"abc":48999830.95,"fy":"2022","sd":"03/30/2022","cd":"2022-10-15","lat":15.16926,"lon":120.9378,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Ilog Bulo River","wd":1.99,"wp":[15.17926,120.95322],"wst":"matched","br":null,"len":440.0,"ph":null,"dup":[],"run":[3567,3738,3239,3047,2323,3520,3061,3096,3476],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":514},{"i":2265,"cid":"24CC0030","pid":"P00838412LZ","t":"Construction of Riverbank Protection Structure at Barangay San Roque, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499378.64,"abc":96499961.09,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.998651,"lon":120.884645,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2837,2840,2848,2850,2852,2880,2883,2897],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":905},{"i":2266,"cid":"21CC0170","pid":"P00526004LZ","t":"Improvement of Waterways and Construction of Flood Control Structures along Bocaue River (Lolomboy Section), Sta. 06+446 - Sta. 06+533, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Bocaue","deo":"Bulacan 1st District Engineering Office","co":"GENUINE BUILDERS","c":19599996.35,"abc":19599708.96,"fy":"2021","sd":"01/14/2022","cd":"2022-09-10","lat":14.770973,"lon":120.927511,"sm":216,"fm":null,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":87.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1746},{"i":2267,"cid":"22OA0017","pid":"P00620338LZ","t":"Construction of Box Culvert along M. Naval St. from Badeo 5 to F. Pascual St., Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"CATTECORYLL CONSTRUCTION & TRADING CORP","c":24499335.42,"abc":24499998.6,"fy":"2022","sd":"02/14/2022","cd":"2023-01-23","lat":14.672052,"lon":120.937826,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1747},{"i":2268,"cid":"24CG0001","pid":"P00820279LZ","t":"Rehabilitation of Eroded Pampanga River Bank at Candating (Phase I), Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91841987.52,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-05","lat":15.148371,"lon":120.814701,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[2650,2220],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CG0001 to 24CG0003) cover the same site, together worth PHP 276,542,532.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":322},{"i":2269,"cid":"24CE0239","pid":"P00824703LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Calipahan, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":19889072.16,"abc":20090000.0,"fy":"2024","sd":"04/24/2024","cd":"2024-10-01","lat":15.597596,"lon":120.918108,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.01,"wp":[15.59762,120.91798],"wst":"matched","br":"Calipahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1748},{"i":2270,"cid":"22CC0034","pid":"P00631216LZ","t":"Rehabilitation of River Control Structures along Bocaue River, Bambang, Bocaue, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079631.44,"abc":45079581.87,"fy":"2022","sd":"02/04/2022","cd":"2022-11-21","lat":14.794558,"lon":120.927639,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1749},{"i":2271,"cid":"24CC0041","pid":"P00839478LZ","t":"Construction of Riverbank Protection Structure at Barangay Sulivan (Phase II), Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":98999764.29,"abc":98999953.38,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.984204,"lon":120.885171,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[2159,2190,2311,2381,2391,2402,2419,2462,2463,2899],"L":"field","s":26,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":830},{"i":2272,"cid":"24CK0025","pid":"P00825241LZ","t":"Rehabilitation of Existing Dike along Rio Chico River (Castillo Section, Right Bank), Phase 3, Sta. (-)1+737.60 - Sta. (-)1+926.25 Concepcion, Tarlac","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"TARLAC","mu":"CONCEPCION (TARLAC)","deo":"Tarlac 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":46750558.17,"abc":46750609.99,"fy":"2024","sd":"02/05/2024","cd":"2024-06-30","lat":15.283893,"lon":120.779538,"sm":448,"fm":448,"tm":432,"am":1256,"md":3.27,"ls":"outside","ww":"Rio Chico","wn":"Rio Chico","wd":0.01,"wp":[15.28382,120.7796],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.67,"value":3.27,"text":"The pin is 3.3 km outside Concepcion, Tarlac, the nearest municipality the record claims. It falls in San Antonio, Nueva Ecija.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":309},{"i":2273,"cid":"23CD0045","pid":"P00727296LZ","t":"Rehabilitation of Flood Control Wall along Meycauayan River, Barangay Tawiran to Wawang Pulo (Section I), Obando Section, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":48249000.0,"abc":48998853.56,"fy":"2023","sd":"03/30/2023","cd":"2023-09-17","lat":14.743587,"lon":120.918282,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.09,"wp":[14.74363,120.91912],"wst":"matched","br":"Tawiran","len":null,"ph":"Section I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1750},{"i":2274,"cid":"22CC0038","pid":"P00631217LZ","t":"Rehabilitation of River Control Structures along Bocaue River, Sulucan, Bocaue, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079631.44,"abc":45079581.87,"fy":"2022","sd":"02/04/2022","cd":"2022-11-21","lat":14.79497,"lon":120.927641,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1751},{"i":2275,"cid":"23CC0284","pid":"P00740335LZ","t":"Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K005+681 to K005+981)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":72374738.66,"abc":72374797.38,"fy":"2023","sd":"03/28/2023","cd":"2023-10-13","lat":14.972001,"lon":120.885224,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2301,2324,2331,2553,2585,2635],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1014},{"i":2276,"cid":"23CC0245","pid":"P00742150LZ","t":"Construction of Flood Mitigation Structures along Bgry. San Vicente, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":69223394.29,"abc":69299766.06,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.842398,"lon":120.814734,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1752},{"i":2277,"cid":"24CC0018","pid":"P00838410LZ","t":"Construction of Riverbank Protection Structure at Barangay San Miguel, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77197298.97,"abc":77199983.77,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.918283,"lon":120.918283,"sm":310,"fm":310,"tm":310,"am":265,"md":12.47,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.47,"text":"The pin is 12.5 km outside Calumpit, Bulacan, the nearest municipality the record claims. It falls in Bustos, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":170},{"i":2278,"cid":"22OA0047","pid":"P00632705LZ","t":"Construction of Riverwall (Phase 2), Barangay Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49500000.0,"abc":48999208.88,"fy":"2022","sd":"02/15/2022","cd":"2023-01-27","lat":14.701498,"lon":120.927658,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[2120,2130,2175,2188,2228,2252,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":54,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01022,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":78},{"i":2279,"cid":"22CC0249","pid":"P00621278LZ","t":"Bank Improvement along Angat River, Sta. 0 + 290 to Sta. 0 + 530, Sabang Section, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":65273430.18,"abc":67549860.4,"fy":"2022","sd":"04/04/2022","cd":"2023-01-28","lat":14.96228,"lon":120.918427,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.22,"wp":[14.96037,120.91881],"wst":"matched","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1753},{"i":2280,"cid":"23DQ0095","pid":"P00742184LZ","t":"Construction of River Bank Protection Works along Bacoor River at Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98980509.66,"abc":98999944.05,"fy":"2023","sd":"06/29/2023","cd":"2024-05-23","lat":14.45458,"lon":120.93808,"sm":98,"fm":98,"tm":360,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.45452,120.93802],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.42,"text":"The record contradicts itself: the municipality field and the pin point to Bacoor City, Cavite, but the title names Cavite City, Cavite, 3 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":426},{"i":2281,"cid":"24CG0017","pid":"P00820283LZ","t":"Rehabilitation of Pampanga River along Candaba, Pampanga (Mandasig-Pasig-Lanang Section)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91096456.9,"abc":96500000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-11-06","lat":15.092075,"lon":120.81474,"sm":318,"fm":318,"tm":null,"am":318,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.04,"wp":[15.09227,120.81505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1754},{"i":2282,"cid":"22DQ0001","pid":"P00620882LZ","t":"Construction of Revetment along Imus River, Brgy. Mabolo I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":57895300.07,"abc":57899993.17,"fy":"2022","sd":"03/22/2022","cd":"2022-11-18","lat":14.4537,"lon":120.92777,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.03,"wp":[14.45367,120.92749],"wst":"matched","br":"Mabolo I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1755},{"i":2283,"cid":"23CC0022","pid":"P00740592LZ","t":"Construction of Flood Mitigation Structures along Barangay San Isidro I, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48999661.43,"abc":48999799.84,"fy":"2023","sd":"03/21/2023","cd":"2023-11-15","lat":14.835687,"lon":120.780013,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1756},{"i":2284,"cid":"22DF0385","pid":"P00644739LZ","t":"Reconstruction/ Rehabilitation of Revetment along Ilang- Ilang River, Bacao I, General Trias City, Cavite","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":9650000.0,"abc":9650000.0,"fy":"2022","sd":"01/09/2023","cd":"2023-03-15","lat":14.399745,"lon":120.88589,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.69,"wp":[14.36675,120.88075],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.69,"text":"The title names Ilang-Ilang, which OpenStreetMap maps through the stated municipality, but the pin is 3.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":427},{"i":2285,"cid":"22PE0099","pid":"P00639441LZ","t":"Construction (Completion) of Flood Control Structure at Colong, Batan, Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"QPJ GENERAL ENGINEERING CONSTRUCTION AND SUPPLY","c":2919512.6,"abc":2940000.0,"fy":"2022","sd":"08/16/2022","cd":"2022-12-20","lat":16.605195,"lon":120.780759,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1757},{"i":2286,"cid":"23CC0223","pid":"P00740351LZ","t":"Construction of Flood Control Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan (K003+835 to K004+033)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":72373012.16,"abc":72374293.86,"fy":"2023","sd":"03/28/2023","cd":"2023-12-04","lat":14.859927,"lon":120.918482,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.36,"wp":[14.85923,120.92175],"wst":"matched","br":"Santol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1758},{"i":2287,"cid":"23AA0150","pid":"P00727045LZ","t":"Construction of Flood Control Structure along Bolo River, Barangay Malasin to Barangay Nagbalagan (Sitio Bago), Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / HERCULES VENTURES INC.","c":18815685.07,"abc":19599752.22,"fy":"2023","sd":"05/18/2023","cd":"2023-07-24","lat":18.53497,"lon":120.780764,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Bolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1759},{"i":2288,"cid":"23CC0094","pid":"P00726921LZ","t":"Rehabilitation of Waterways and Construction of Concrete Slope Protection with Steel Sheet Piles along Bocaue River, K009 + 840 to K009 + 990, Bambang, Bocaue, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":77682498.59,"abc":77681873.8,"fy":"2023","sd":"03/14/2023","cd":"2023-11-28","lat":14.7732,"lon":120.927847,"sm":216,"fm":216,"tm":216,"am":941,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1760},{"i":2289,"cid":"24E00147","pid":"P00825118LZ","t":"Construction of Flood Control Structure (River Training Works) along Mompong River (Downstream), Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":289496842.1,"abc":289500000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-07-22","lat":12.746848,"lon":120.815203,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Mompong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1761},{"i":2290,"cid":"23CD0046","pid":"P00727365LZ","t":"Rehabilitation of Flood Control Wall along Meycauayan River, Barangay Tawiran to Wawang Pulo (Section II), Obando Section, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":46058208.67,"abc":46058879.0,"fy":"2023","sd":"03/13/2023","cd":"2023-08-28","lat":14.742719,"lon":120.91852,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.06,"wp":[14.74279,120.91909],"wst":"matched","br":"Tawiran","len":null,"ph":"Section II","dup":[2292],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 94,320,232.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":955},{"i":2291,"cid":"23OA0051","pid":"P00726812LZ","t":"Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"DMLC BUILDERS","c":62725000.0,"abc":62719315.3,"fy":"2023","sd":"03/22/2023","cd":"2024-03-25","lat":14.680897,"lon":120.938105,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tanza","wn":"Tanza River","wd":0.04,"wp":[14.68069,120.93784],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[2217,2230,2337,2398],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OA0049 to 23OA0053) cover the same site, together worth PHP 313,625,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":411},{"i":2292,"cid":"23CD0086","pid":"P00727362LZ","t":"Construction of Flood Controll Wall along Meycauayan River, Barangay Tawiran-Wawang Pulo (Sta. 2 + 494 - Sta. 2 + 608), Obando Section, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":48262023.44,"abc":48999465.41,"fy":"2023","sd":"04/05/2023","cd":"2023-10-08","lat":14.742719,"lon":120.91852,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.06,"wp":[14.74279,120.91909],"wst":"matched","br":"Tawiran-Wawang Pulo","len":114.0,"ph":null,"dup":[2290],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 94,320,232.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":906},{"i":2293,"cid":"22CC0226","pid":"P00631181LZ","t":"Construction of Flood Control Structure along Guiguinto River (Sta. 1+ 036 to Sta. 1+ 338), Barangay Daungan, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":45079811.0,"abc":45079492.61,"fy":"2022","sd":"04/04/2022","cd":"2022-10-30","lat":14.85559,"lon":120.886016,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.95,"wp":[14.85018,120.87911],"wst":"matched","br":"Daungan","len":302.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1762},{"i":2294,"cid":"24CG0004","pid":"P00821317LZ","t":"Strengthening of Road Dike along Pampanga River, Barangay Sucad, Apalit, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":93604874.52,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-03","lat":14.976722,"lon":120.780989,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[14.97683,120.78152],"wst":"matched","br":"Sucad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1763},{"i":2295,"cid":"23DE0020","pid":"P00740399LZ","t":"Construction of Flood Control Structure at Dulangan, San Luis, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"OIC CONZTRUCT AND SUPPLY CORPORATION(FORMERLY:OIC CONST.)","c":22195000.0,"abc":22540000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-08-18","lat":13.853056,"lon":120.918611,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1764},{"i":2296,"cid":"23CC0034","pid":"P00737452LZ","t":"Construction of Drainage Canal, Makinabang, Baliuag, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DOUBLE Z CONSTRUCTION AND SUPPLY","c":4949902.4,"abc":4949834.42,"fy":"2023","sd":"02/06/2023","cd":"2023-05-19","lat":14.919294,"lon":120.886101,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1765},{"i":2297,"cid":"22DQ0091","pid":"P00640463LZ","t":"Construction of Revetment along Bacoor River (tributary to Manila Bay), Phase 2, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98999931.03,"abc":98999994.6,"fy":"2022","sd":"04/07/2022","cd":"2023-04-01","lat":14.45641,"lon":120.93816,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.19,"wp":[14.45476,120.93767],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1766},{"i":2298,"cid":"23DQ0021","pid":"P00726557LZ","t":"Construction of Revetment along Imus River, Barangay Mabolo III, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96476338.22,"abc":96499989.44,"fy":"2023","sd":"03/08/2023","cd":"2024-03-31","lat":14.44766,"lon":120.9279,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.01,"wp":[14.44756,120.92782],"wst":"matched","br":"Mabolo III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1767},{"i":2299,"cid":"22DQ0092","pid":"P00640462LZ","t":"Construction of Revetment along Bacoor River (tributary to Manila Bay), Phase 1, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98999980.77,"abc":98999994.73,"fy":"2022","sd":"04/07/2022","cd":"2023-04-01","lat":14.4545,"lon":120.93816,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.45445,120.93808],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1768},{"i":2300,"cid":"22DB0050","pid":"P00632861LZ","t":"Construction of Flood Control Mitigation Structure in Calaca, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF CALACA (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"JOMZKI CONSTRUCTION AND SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-08-03","lat":13.970731,"lon":120.815375,"sm":292,"fm":292,"tm":180,"am":292,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":30.66,"text":"The record contradicts itself: the municipality field and the pin point to Calaca, Batangas, but the title names Batangas City, Batangas, 31 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":621},{"i":2301,"cid":"23CC0146","pid":"P00726463LZ","t":"Construction of River Control Project at Barangay Pagala, Sta. 00+500 to Sta. 00+900, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499709.18,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-12-06","lat":14.967216,"lon":120.886366,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":400.0,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2324,2331,2553,2585,2635],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":956},{"i":2302,"cid":"24CC0165","pid":"P00823405LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Santol (Purok 1 to Purok 3), Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":77198851.79,"abc":77199663.46,"fy":"2024","sd":"02/28/2024","cd":"2024-06-19","lat":14.859988,"lon":120.91863,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.35,"wp":[14.85923,120.92175],"wst":"matched","br":"Santol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1769},{"i":2303,"cid":"22OA0026","pid":"P00620018LZ","t":"Construction of Box Culvert along Gov. A. Pascual St., From Judge A. Roldan to T. Gonzales St. connecting to Bacog Pumping Station, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":51138435.86,"abc":51939997.47,"fy":"2022","sd":"02/14/2022","cd":"2022-12-08","lat":14.670542,"lon":120.938234,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1770},{"i":2304,"cid":"23CG0041","pid":"P00726512LZ","t":"Rehabilitation of Eroded Bank of Pampanga River at Candating, Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91626654.28,"abc":96500000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-10-17","lat":15.147785,"lon":120.815502,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[15.1474,120.81517],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1771},{"i":2305,"cid":"23DF0077","pid":"P00744299LZ","t":"Rehabilitation of Revetment along Ilang-Ilang River, Brgy. Bacao I, General Trias City, Cavite, Sta. 0+000 to Sta. 0+100.","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"F316 CONSTRUCTION CORP.","c":18128490.0,"abc":18128490.0,"fy":"2023","sd":"03/15/2023","cd":"2023-08-11","lat":14.399167,"lon":120.886389,"sm":387,"fm":387,"tm":360,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.64,"wp":[14.36675,120.88075],"wst":"matched","br":"Bacao I","len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.09,"text":"The record contradicts itself: the municipality field and the pin point to City of General Trias, Cavite, but the title names Cavite City, Cavite, 6 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.64,"text":"The title names Ilang-Ilang, which OpenStreetMap maps through the stated municipality, but the pin is 3.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":269},{"i":2306,"cid":"23AA0263","pid":"P00740518LZ","t":"Construction of Seawall, Poblacion 1 (Sitio Magsaysay), Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":19599921.21,"abc":19599927.59,"fy":"2023","sd":"04/25/2023","cd":"2023-10-23","lat":18.557329,"lon":120.780998,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1772},{"i":2307,"cid":"22CD0086","pid":"P00639346LZ","t":"Construction of Flood Mitigation Structure along Meycauayan River (Liputan - Nagbalon), Sta. 04+000 - Sta. 04+400, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96498187.66,"abc":96499091.88,"fy":"2022","sd":"06/09/2022","cd":"2023-07-14","lat":14.73669,"lon":120.92803,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.08,"wp":[14.73604,120.92764],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1773},{"i":2308,"cid":"24CD0105","pid":"P00825082LZ","t":"Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+106 - Sta. 02+231, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"G.F. FABIAN CONSTRUCTION / F316 CONSTRUCTION CORP.","c":96499808.15,"abc":96499640.32,"fy":"2024","sd":"04/25/2024","cd":"2025-03-01","lat":14.741632,"lon":120.918738,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.08,"wp":[14.74191,120.91938],"wst":"matched","br":"Tawiran","len":125.0,"ph":null,"dup":[],"run":[2317,2385,2537,2706],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0105 to 24CD0109) cover the same site, together worth PHP 482,499,381.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.53,"value":771998,"text":"About PHP 771,998 per metre over 125 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":7},{"i":2309,"cid":"24CC0052","pid":"P00838414LZ","t":"Construction of Riverbank Protection Structure at Barangay Santa Cruz, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499302.69,"abc":96499932.03,"fy":"2024","sd":"02/07/2024","cd":"2024-06-19","lat":14.844905,"lon":120.815724,"sm":597,"fm":597,"tm":597,"am":401,"md":4.09,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":48,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.7,"value":4.09,"text":"The pin is 4.1 km outside Guiguinto, Bulacan, the nearest municipality the record claims. It falls in City of Malolos, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":207},{"i":2310,"cid":"23CG0170","pid":"P00726173LZ","t":"Rehabilitation of Eroded Bank at Cupang, Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"N.T. TULABUT CONSTRUCTION AND SUPPLY","c":25123741.7,"abc":26460000.0,"fy":"2023","sd":"05/31/2023","cd":"2024-07-02","lat":15.140852,"lon":120.781012,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[2312],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 116,702,223.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1122},{"i":2311,"cid":"24CC0173","pid":"P00843311LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay Sulivan (Purok 3), Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":77199953.41,"abc":77199974.8,"fy":"2024","sd":"02/28/2024","cd":"2024-08-09","lat":14.972212,"lon":120.886404,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2381,2391,2402,2419,2462,2463,2899],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":907},{"i":2312,"cid":"24CG0174","pid":"P00823486LZ","t":"Contruction of Slope Protection along Pampanga River, Brgy. Cupang and Brgy. Guemasan, Arayat, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91578481.02,"abc":96500000.0,"fy":"2024","sd":"05/22/2024","cd":"2025-01-19","lat":15.140852,"lon":120.781012,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[15.14098,120.78147],"wst":"matched","br":"Cupang","len":null,"ph":null,"dup":[2310],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 116,702,223.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1049},{"i":2313,"cid":"24CC0402","pid":"P00845810LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Bakod To Purok 6), Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999038.56,"abc":98999334.23,"fy":"2024","sd":"04/23/2024","cd":"2025-01-17","lat":14.764925,"lon":120.918991,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1774},{"i":2314,"cid":"22OA0036","pid":"P00631013LZ","t":"Construction of Bacog Pumping Station, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":19599571.94,"abc":19599707.05,"fy":"2022","sd":"02/14/2022","cd":"2022-12-26","lat":14.665673,"lon":120.938324,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1775},{"i":2315,"cid":"24CC0448","pid":"P00845797LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways, Brgy. San Vicente, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999728.26,"abc":98999733.77,"fy":"2024","sd":"05/21/2024","cd":"2024-12-06","lat":14.84292,"lon":120.81581,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1776},{"i":2316,"cid":"24CD0002","pid":"P00820204LZ","t":"Construction of Flood Control Structure along Meycauayan River and Its Tributaries, Sta. 03+500 - Sta. 03+700 (Liputan - Constantino Section, Right Side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":67535330.1,"abc":67549676.95,"fy":"2024","sd":"02/14/2024","cd":"2024-11-02","lat":14.73766,"lon":120.928135,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.18,"wp":[14.73625,120.92728],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2525,2328,2371,2621],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0001 to 24CD0005) cover the same site, together worth PHP 337,734,367.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":412},{"i":2317,"cid":"24CD0106","pid":"P00825083LZ","t":"Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+231 - Sta. 02+356, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499858.85,"abc":96499402.61,"fy":"2024","sd":"06/05/2024","cd":"2025-01-11","lat":14.739736,"lon":120.919691,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.09,"wp":[14.74023,120.92036],"wst":"matched","br":"Tawiran","len":125.0,"ph":null,"dup":[],"run":[2308,2385,2537,2706],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0105 to 24CD0109) cover the same site, together worth PHP 482,499,381.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.53,"value":771999,"text":"About PHP 771,999 per metre over 125 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":8},{"i":2318,"cid":"23DC0075","pid":"P00725766LZ","t":"Construction of Riverbank Protection along Pansipit River - Phase 7, Agoncillo - San Nicolas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN NICOLAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D / THREE W BUILDERS, INC.","c":96499113.0,"abc":96500000.0,"fy":"2023","sd":"03/07/2023","cd":"2024-05-30","lat":13.922101,"lon":120.938368,"sm":1342,"fm":1342,"tm":180,"am":1342,"md":0.0,"ls":"inside","ww":"Pansipit","wn":"Pansipit River","wd":0.03,"wp":[13.92235,120.93834],"wst":"matched","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.59,"text":"The record contradicts itself: the municipality field and the pin point to San Nicolas, Batangas, but the title names Batangas City, Batangas, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":451},{"i":2319,"cid":"24CC0037","pid":"P00838383LZ","t":"Construction of Riverbank Protection Structure along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":96499234.24,"abc":96499956.74,"fy":"2024","sd":"02/07/2024","cd":"2024-09-19","lat":14.856568,"lon":120.886857,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":1.09,"wp":[14.85018,120.87911],"wst":"matched","br":"Daungan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1777},{"i":2320,"cid":"23CC0197","pid":"P00740583LZ","t":"Construction of Flood Mitigation Structure protecting Public Infrastructures and Rehabilitation of Waterways at barangay Santo Nino, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":48999754.81,"abc":48999769.65,"fy":"2023","sd":"03/21/2023","cd":"2023-08-09","lat":14.903132,"lon":120.78108,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1778},{"i":2321,"cid":"24CG0026","pid":"P00823463LZ","t":"Rehabilitation of Eroded Pampanga River Bank at Candating (Phase II), Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91485522.95,"abc":96500000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-11-04","lat":15.146947,"lon":120.816004,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1779},{"i":2322,"cid":"24OA0032","pid":"P00820541LZ","t":"Construction of Dampalit Riverwall (Phase 7), Barangay Dampalit, Malabon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":48999924.88,"abc":48996824.5,"fy":"2024","sd":"02/12/2024","cd":"2024-10-21","lat":14.701688,"lon":120.92814,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 7","dup":[],"run":[2252,2130],"cl":[2120,2130,2175,2188,2228,2252,2278,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":57,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0032 to 24OA0034) cover the same site, together worth PHP 146,998,200.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":63},{"i":2323,"cid":"22CD0156","pid":"P00632698LZ","t":"Construction of Flood Control Structures along Bulo River Sta. 01+000 - Sta. 01+880 (Right Side), San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":98996230.29,"abc":98999673.82,"fy":"2022","sd":"03/30/2022","cd":"2023-02-16","lat":15.17006,"lon":120.9385,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Ilog Bulo River","wd":1.88,"wp":[15.17926,120.95322],"wst":"matched","br":null,"len":880.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,3047,3520,3061,3096,3476],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":203},{"i":2324,"cid":"23CC0059","pid":"P00736009LZ","t":"Construction of Concrete Slope Protection at Barangay Pagala, K002 + 360 - K002 + 660, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":38599392.15,"abc":38599553.69,"fy":"2023","sd":"02/13/2023","cd":"2023-09-21","lat":14.968435,"lon":120.886921,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2301,2331,2553,2585,2635],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1098},{"i":2325,"cid":"22CC0308","pid":"P00640515LZ","t":"Construction of Flood Control Structure including outfall along Barangay Virgen Delos Flores, Sta. Barbara and Tiaong, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":48999991.09,"abc":48999274.47,"fy":"2022","sd":"04/05/2022","cd":"2023-03-30","lat":14.945404,"lon":120.896128,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Virgen Delos Flores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1780},{"i":2326,"cid":"23CG0133","pid":"P00726915LZ","t":"Construction of Damage Dike with Concrete Slope Protection works including River training works at Maasim River, Phase II, barangay Vizal San Pablo, Candaba Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68394362.92,"abc":72375000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-01-19","lat":15.041364,"lon":120.896264,"sm":318,"fm":318,"tm":null,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.01,"wp":[15.04135,120.89614],"wst":"matched","br":"Vizal San Pablo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1781},{"i":2327,"cid":"22PE0145","pid":"P00639450LZ","t":"Construction of Slope Protection and Drainage Structure, Brgy Duacan, Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CHRISHUA CONSTRUCTION SERVICES","c":2937836.0,"abc":2940000.0,"fy":"2022","sd":"09/19/2022","cd":"2022-11-11","lat":16.640585,"lon":120.816135,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Duacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1782},{"i":2328,"cid":"24CD0003","pid":"P00820205LZ","t":"Construction of Flood Control Structure along Meycauayan River and Its Tributaries, Sta. 03+700 - Sta. 03+900 (Liputan - Constantino Section, Right Side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":67549262.71,"abc":67549529.17,"fy":"2024","sd":"02/14/2024","cd":"2024-11-04","lat":14.738926,"lon":120.928151,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.3,"wp":[14.73657,120.92672],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2525,2316,2371,2621],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0001 to 24CD0005) cover the same site, together worth PHP 337,734,367.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":413},{"i":2329,"cid":"24CG0024","pid":"P00821589LZ","t":"Construction of Flood Control Structure along Pampanga River, Apalit, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":46554004.9,"abc":49000000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-09-20","lat":14.97585,"lon":120.781308,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[14.97601,120.78178],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1783},{"i":2330,"cid":"23CC0213","pid":"P00727281LZ","t":"Construction of Flood Control Structure along Angat River, Sta. Barbara, Baliuag, Bulacan (K010+080 to K010+380)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":72373023.56,"abc":72374701.07,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.938445,"lon":120.896586,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.93825,120.8973],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1784},{"i":2331,"cid":"23CC0250","pid":"P00740333LZ","t":"Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K003+120 to K003+420)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":72374463.63,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-06","lat":14.967423,"lon":120.887173,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2301,2324,2553,2585,2635],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1015},{"i":2332,"cid":"22CG0015","pid":"P00620207LZ","t":"Rehabilitation of River Channel and Construction of Concrete Slope Protection, Malisik R.C., Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"CHOLO CONSTRUCTION AND TRADING","c":82072158.49,"abc":86850000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-11-27","lat":15.12386,"lon":120.93865,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1785},{"i":2333,"cid":"24CE0240","pid":"P00823435LZ","t":"Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Calipahan, Talavera, Nueva Ecija (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":28659917.78,"abc":28950000.0,"fy":"2024","sd":"04/24/2024","cd":"2024-10-01","lat":15.608053,"lon":120.919995,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.60814,120.91987],"wst":"matched","br":"Calipahan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1786},{"i":2334,"cid":"22CC0124","pid":"P00631191LZ","t":"Construction of Flood Control Structures along Bocaue River, K003 + 593.60 - K003 + 850, Bunlo, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":27439393.37,"abc":27439044.19,"fy":"2022","sd":"04/04/2022","cd":"2022-11-21","lat":14.78,"lon":120.928202,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":537},{"i":2335,"cid":"24CD0042","pid":"P00820826LZ","t":"Rehabilitation of Paco Floodgate, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":29399826.65,"abc":29398157.2,"fy":"2024","sd":"02/12/2024","cd":"2024-08-03","lat":14.730337,"lon":120.920619,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1787},{"i":2336,"cid":"23CC0131","pid":"P00725683LZ","t":"Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":96499443.56,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-11-21","lat":14.982038,"lon":120.887265,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":400.0,"ph":null,"dup":[],"run":[2105,2256],"cl":[2105,2256,2630,2856,2860,2861,2874,2881,2890,2893],"L":"field","s":55,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0129 to 23CC0131) cover the same site, together worth PHP 289,497,821.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":74},{"i":2337,"cid":"23OA0052","pid":"P00726813LZ","t":"Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 4)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":62725000.0,"abc":62718157.5,"fy":"2023","sd":"03/22/2023","cd":"2024-06-29","lat":14.679962,"lon":120.938722,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tanza","wn":"Tanza River","wd":0.03,"wp":[14.67982,120.9385],"wst":"matched","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[2217,2230,2291,2398],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OA0049 to 23OA0053) cover the same site, together worth PHP 313,625,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":414},{"i":2338,"cid":"24CC0159","pid":"P00845982LZ","t":"Rehabilitation of Ugong Creek, Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":49499959.76,"abc":49499698.53,"fy":"2024","sd":"02/28/2024","cd":"2024-08-25","lat":14.826069,"lon":120.896641,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Ugong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1788},{"i":2339,"cid":"22CG0043","pid":"P00620846LZ","t":"Rehabilitation of Eroded Pampanga River Bank along Barangay San Juan, San Luis, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN LUIS (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"NULAS BUILDERS / EDDMARI CONSTRUCTION & TRADING","c":83810211.36,"abc":86850000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-10-28","lat":15.061636,"lon":120.816225,"sm":1319,"fm":1319,"tm":1319,"am":1319,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1789},{"i":2340,"cid":"23CC0020","pid":"P00740591LZ","t":"Construction of Flood Mitigation Structures along Barangay Binakod, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":47006762.89,"abc":48999739.7,"fy":"2023","sd":"03/28/2023","cd":"2023-11-22","lat":14.793942,"lon":120.782718,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Binakod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1790},{"i":2341,"cid":"22DQ0002","pid":"P00620880LZ","t":"Construction of Revetment along Imus River, Brgy. Banalo, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":67225751.21,"abc":67225751.21,"fy":"2022","sd":"03/08/2022","cd":"2022-12-13","lat":14.45575,"lon":120.92835,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.02,"wp":[14.45579,120.92812],"wst":"matched","br":"Banalo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1791},{"i":2342,"cid":"22E00071","pid":"P00620654LZ","t":"Construction of Patrick Flood Control (Kambingan Section), Sta. 0+000 - Sta. 0+070 (RS), Sta. 0+140 - Sta. 0+477.25 (RS), Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":48249953.59,"abc":226774789.4,"fy":"2022","sd":"07/06/2022","cd":"2023-07-03","lat":12.926667,"lon":120.816942,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":407.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1792},{"i":2343,"cid":"23DB0119","pid":"P00742386LZ","t":"Construction of Riprapping / Embankment, Brgy. Payapa Ilaya, Lemery, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":4800000.0,"abc":4950000.0,"fy":"2023","sd":"05/19/2023","cd":"2023-09-15","lat":14.001944,"lon":120.896667,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Payapa Ilaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1793},{"i":2344,"cid":"24CC0149","pid":"P00845798LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bambang, Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":98998749.59,"abc":98999020.79,"fy":"2024","sd":"04/23/2024","cd":"2025-01-17","lat":14.763604,"lon":120.920712,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1794},{"i":2345,"cid":"24CC0085","pid":"P00821266LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Bintog, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BELL CONSTRUCTION","c":72374404.74,"abc":72374577.29,"fy":"2024","sd":"02/07/2024","cd":"2024-06-24","lat":14.903708,"lon":120.887536,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90399,120.88735],"wst":"matched","br":"Bintog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1795},{"i":2346,"cid":"24CC0073","pid":"P00824698LZ","t":"Construction of Revetment at Barangay Santo Niño, Calumpit, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PTM DEVELOPMENT CORP.","c":39199921.38,"abc":39199931.48,"fy":"2024","sd":"02/02/2024","cd":"2024-07-08","lat":14.902771,"lon":120.7831,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Niño","len":null,"ph":null,"dup":[2356],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,199,847.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":957},{"i":2347,"cid":"21OA0002","pid":"P00525709LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 7), Brgy. Dampalit, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":34790000.0,"abc":34787975.95,"fy":"2021","sd":"02/28/2022","cd":"2022-10-01","lat":14.691143,"lon":120.928355,"sm":399,"fm":null,"tm":399,"am":409,"md":0.21,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.03,"wp":[14.69085,120.92828],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 7","dup":[],"run":[2400,2228,2175],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (21OA0002 to 21OA0005) cover the same site, together worth PHP 139,160,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":88},{"i":2348,"cid":"23C00194","pid":"P00744230LZ","t":"Construction of Flood Control Structure, Barangay Maguinao (BSU Section) San Rafael, Bulacan Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":96499871.18,"abc":96499951.99,"fy":"2023","sd":"06/20/2023","cd":"2024-03-15","lat":15.016156,"lon":120.93888,"sm":1352,"fm":1352,"tm":null,"am":1352,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maguinao","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1796},{"i":2349,"cid":"24CC0087","pid":"P00838388LZ","t":"Construction of Riverbank Protection Structure at Barangay Batbatnin, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199938.27,"abc":77199919.17,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.782018,"lon":120.817508,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batbatnin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1797},{"i":2350,"cid":"22DE0091","pid":"P00640459LZ","t":"Construction of Flood Control Structure, Poblacion, San Luis, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP.","c":78404898.22,"abc":99000000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-24","lat":13.854094,"lon":120.920826,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1798},{"i":2351,"cid":"24CC0294","pid":"P00843304LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay Cambaog-Talampas (Purok 3), Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":77199088.96,"abc":77199961.67,"fy":"2024","sd":"04/16/2024","cd":"2024-11-28","lat":14.932046,"lon":120.896899,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cambaog-Talampas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1799},{"i":2352,"cid":"22CC0142","pid":"P00621075LZ","t":"Rehabilitation of Flood Control Structure along Angat River, Makinabang Section, Sta. 0 + 000 to Sta. 0 + 353.60, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48998739.19,"abc":48999081.39,"fy":"2022","sd":"02/18/2022","cd":"2023-05-13","lat":14.925685,"lon":120.887589,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.92567,120.88833],"wst":"matched","br":null,"len":353.6,"ph":null,"dup":[2354,2363],"run":[],"cl":[],"L":"field","s":30,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 173,933,639.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":665},{"i":2353,"cid":"22CF0057","pid":"P00620841LZ","t":"Construction of Pampanga River Flood Control, Sta. 39+912.78 - Sta. 40+739.58,Tambo Adorable, San Leonardo, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN LEONARDO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":96499987.67,"abc":96499996.54,"fy":"2022","sd":"03/02/2022","cd":"2023-03-14","lat":15.364722,"lon":120.928611,"sm":1316,"fm":1316,"tm":1316,"am":1316,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.03,"wp":[15.36444,120.92854],"wst":"matched","br":null,"len":826.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1800},{"i":2354,"cid":"22CC0236","pid":"P00621566LZ","t":"Construction of Major River System, Angat River, Culianin and Makinabang Section, Sta. 00 + 632 to Sta. 01 + 007, Plaridel/Baliwag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":95534903.44,"abc":95534935.86,"fy":"2022","sd":"04/04/2022","cd":"2022-12-12","lat":14.925685,"lon":120.887589,"sm":136,"fm":136,"tm":248,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.92567,120.88833],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[2352,2363],"run":[],"cl":[],"L":"records","s":51,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.35,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 173,933,639.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":182},{"i":2355,"cid":"22CE0110","pid":"P00631226LZ","t":"Construction of Flood Control Structure, Barangays Mapangpang and Salvacion 2nd, Lupao, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LUPAO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"P.S. AQUINO CONSTRUCTION / NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":48816551.04,"abc":49000000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-08","lat":15.806548,"lon":120.897035,"sm":831,"fm":831,"tm":831,"am":831,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mapangpang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1801},{"i":2356,"cid":"24CC0074","pid":"P00820823LZ","t":"Construction of Revetment at Barangay Santo Niño-Pungo, Calumpit, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PTM DEVELOPMENT CORP.","c":48999926.03,"abc":48999945.81,"fy":"2024","sd":"02/02/2024","cd":"2024-08-29","lat":14.902771,"lon":120.7831,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Niño-Pungo","len":null,"ph":null,"dup":[2346],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,199,847.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":872},{"i":2357,"cid":"22EB0030","pid":"P00621103LZ","t":"Construction of Flood Control Structure along Anahawin River, Sta. 0+000 - Sta. 0+315, Brgy. Poblacion, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KGB ENGINEERING AND CONSTRUCTION / N. SALES CONSTRUCTION","c":39978536.26,"abc":49000000.0,"fy":"2022","sd":"05/30/2022","cd":"2023-03-28","lat":12.579883,"lon":120.9391,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Anahawin","wn":"Anahawin River","wd":0.06,"wp":[12.58004,120.93959],"wst":"matched","br":"Poblacion","len":315.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1802},{"i":2358,"cid":"21PF0025","pid":"P00525908LZ","t":"Construction of Balili Flood Control Sta. 1+429 - 1+698 (L.S.), Sta 1+445 - Sta 1+698 (R.S.), Sta 1+711 - Sta 1+849 (L.S.), Sta 1+727 - Sta 1+803 (R.S.), Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Mankayan","deo":"Benguet 2nd District Engineering Office","co":"LAYAD GENERAL ENGINEERING CONSTRUCTION AND AGGREGATES","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"02/20/2022","cd":"2022-10-20","lat":16.861789,"lon":120.817561,"sm":921,"fm":null,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":736.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1803},{"i":2359,"cid":"25CF0039","pid":"P00921446LZ","t":"Rehabilitation of River Bank Structure along Pampanga River, Barangay San Pablo, Jaen, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"JAEN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"NUEDA BUILDERS CONSTRUCTION & SUPPLY INC.","c":96013671.84,"abc":96499998.78,"fy":"2025","sd":"02/20/2025","cd":"2025-04-24","lat":15.382,"lon":120.921,"sm":659,"fm":659,"tm":659,"am":659,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.07,"wp":[15.38145,120.92138],"wst":"matched","br":"San Pablo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1804},{"i":2360,"cid":"22CC0016","pid":"P00631196LZ","t":"Construction of Flood Mitigation Structure at Barangay Panducot, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MCB ZAMORA CONSTRUCTION & SUPPLY","c":39198299.28,"abc":39199665.51,"fy":"2022","sd":"01/28/2022","cd":"2022-09-30","lat":14.87639,"lon":120.7836,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panducot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1805},{"i":2361,"cid":"22OA0042","pid":"P00632704LZ","t":"Construction of Riverwall (Phase 1), Barangay Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":40590000.0,"abc":40179561.14,"fy":"2022","sd":"02/14/2022","cd":"2022-10-07","lat":14.702209,"lon":120.928669,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 1","dup":[],"run":[2563,2722,2658],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":61,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OA0038 to 22OA0042) cover the same site, together worth PHP 214,290,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01022,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":19},{"i":2362,"cid":"23E00027","pid":"P00740435LZ","t":"Construction of Ligaya-Sta. Lucia Coastal Road, Sablayan, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"PALUAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":207472845.6,"abc":207474999.8,"fy":"2023","sd":"04/13/2023","cd":"2023-12-20","lat":12.8246,"lon":120.7836,"sm":1228,"fm":1072,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":54.11,"text":"The record contradicts itself: the title and the pin point to Sablayan, Occidental Mindoro, but the municipality field names Paluan, Occidental Mindoro, 54 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":428},{"i":2363,"cid":"22CC0290","pid":"P00639471LZ","t":"Construction of Riverbank Protection along Angat River Brgy. Tarcan Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":29399996.63,"abc":29399862.89,"fy":"2022","sd":"04/05/2022","cd":"2022-09-01","lat":14.925685,"lon":120.887589,"sm":136,"fm":136,"tm":248,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.92567,120.88833],"wst":"matched","br":"Tarcan Baliuag","len":null,"ph":null,"dup":[2352,2354],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.35,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 173,933,639.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":270},{"i":2364,"cid":"22OA0014","pid":"P00620354LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 19), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":49000000.0,"abc":48979511.1,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.699822,"lon":120.921056,"sm":399,"fm":399,"tm":399,"am":409,"md":0.27,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.01,"wp":[14.69982,120.92101],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 19","dup":[],"run":[2677,2725,2662,2597,2573,2490,2405,2389,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":47},{"i":2365,"cid":"23DC0175","pid":"P00746108LZ","t":"Rehabilltation/Reconstruction of Leviste Bridge I River Revetment, Barangay Leviste, Laurel Batangas K0090+1127","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"RGB CONSTRUCTION (FORMERLY:REYBER CONSTRUCTION AND SUPPLY)","c":7236836.0,"abc":7237500.0,"fy":"2023","sd":"01/05/2024","cd":"2024-04-02","lat":14.069757,"lon":120.939146,"sm":762,"fm":762,"tm":null,"am":762,"md":0.0,"ls":"inside","ww":"Leviste Bridge I","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Leviste","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1806},{"i":2366,"cid":"23CC0082","pid":"P00726466LZ","t":"Construction of Riverwall along Angat River, Tiaong Section, Sta. 08+710 to Sta. 09+040, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96498922.73,"abc":96499205.41,"fy":"2023","sd":"02/13/2023","cd":"2023-08-28","lat":14.940787,"lon":120.897267,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.94051,120.89772],"wst":"matched","br":null,"len":330.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1807},{"i":2367,"cid":"24CC0264","pid":"P00843313LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Atlag, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":72374953.65,"abc":72374985.26,"fy":"2024","sd":"04/02/2024","cd":"2024-06-11","lat":14.827797,"lon":120.817788,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Atlag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1808},{"i":2368,"cid":"24CC0422","pid":"P00825070LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Bintog Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199741.94,"abc":77199763.25,"fy":"2024","sd":"05/14/2024","cd":"2024-07-25","lat":14.905556,"lon":120.887923,"sm":1152,"fm":1152,"tm":1152,"am":1182,"md":0.09,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.11,"wp":[14.90478,120.88855],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2614,2844],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0421 to 24CC0423) cover the same site, together worth PHP 250,899,023.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":397},{"i":2369,"cid":"24CC0043","pid":"P00839578LZ","t":"Construction of Revetment along Balagtas River, Santol, Balagtas, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.G. FRANCISCO CONSTRUCTION","c":49499812.33,"abc":49499908.39,"fy":"2024","sd":"03/20/2024","cd":"2024-09-18","lat":14.850006,"lon":120.921292,"sm":117,"fm":117,"tm":117,"am":1084,"md":0.01,"ls":"boundary","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.84995,120.92143],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1809},{"i":2370,"cid":"24PI0009","pid":"P00821541LZ","t":"Construction of Gayang Flood Control along Chico River, Sabangan, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"SABANGAN (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"FJ MIRANDA CONSTRUCTION","c":39200000.0,"abc":39199999.5,"fy":"2024","sd":"02/18/2024","cd":"2024-06-08","lat":16.96179,"lon":120.92131,"sm":1226,"fm":1226,"tm":1226,"am":1226,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.02,"wp":[16.96173,120.92151],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1810},{"i":2371,"cid":"24CD0004","pid":"P00820206LZ","t":"Construction of Flood Control Structure along Meycauayan River and Its Tributaries, Sta. 03+900 - Sta. 04+100 (Liputan - Constantino Section, Right Side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":67549945.46,"abc":67549578.43,"fy":"2024","sd":"02/14/2024","cd":"2024-09-03","lat":14.737743,"lon":120.928802,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.23,"wp":[14.73599,120.92774],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2525,2316,2328,2621],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0001 to 24CD0005) cover the same site, together worth PHP 337,734,367.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":415},{"i":2372,"cid":"24OA0023","pid":"P00820556LZ","t":"Construction of Tambak Uno Pumping Station, Barangay Tanza 2, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"721 BUILDERS CORPORATION","c":29399282.43,"abc":29399296.33,"fy":"2024","sd":"02/12/2024","cd":"2025-04-08","lat":14.6768,"lon":120.939567,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1811},{"i":2373,"cid":"24CC0001","pid":"P00838379LZ","t":"Construction of Riverbank Protection Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":96499536.28,"abc":96499888.93,"fy":"2024","sd":"02/07/2024","cd":"2025-01-31","lat":14.850235,"lon":120.921323,"sm":117,"fm":117,"tm":117,"am":1084,"md":0.01,"ls":"boundary","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.85022,120.92149],"wst":"matched","br":"Santol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1812},{"i":2374,"cid":"23AA0261","pid":"P00740516LZ","t":"Construction of Flood Control Structure, Barangay Subec, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48999546.39,"abc":48999547.34,"fy":"2023","sd":"04/25/2023","cd":"2023-12-06","lat":18.577999,"lon":120.817878,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Subec","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1813},{"i":2375,"cid":"22CC0269","pid":"P00639349LZ","t":"Construction of Riverbank Protection along Angat River Culianin to Cambaog, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":57899336.29,"abc":57898808.89,"fy":"2022","sd":"04/04/2022","cd":"2022-11-29","lat":14.927108,"lon":120.888433,"sm":1152,"fm":1152,"tm":1152,"am":265,"md":0.66,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.92707,120.8882],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2041,2639],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0266 to 22CC0269) cover the same site, together worth PHP 96,119,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":416},{"i":2376,"cid":"22CG0014","pid":"P00620847LZ","t":"Rehabilitation of Eroded Pampanga River Bank along Barangay Sucad, Apalit, Pampanga (Phase II)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":84244493.37,"abc":86850000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-10-30","lat":14.96689,"lon":120.78365,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sucad","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1814},{"i":2377,"cid":"23CC0078","pid":"P00736003LZ","t":"Construction of Concrete Revetment along Balagtas River Sta. 14 + 780 - Sta. 14 + 985, Panginay Section, Balagtas, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RDBT CONSTRUCTION CORP. / C.B. GARAY PHILWIDE BUILDERS","c":57899547.58,"abc":57899152.08,"fy":"2023","sd":"02/13/2023","cd":"2023-12-01","lat":14.80697,"lon":120.897333,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.14,"wp":[14.80778,120.89836],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2529,2491],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0075 to 23CC0078) cover the same site, together worth PHP 202,647,663.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":417},{"i":2378,"cid":"22PE0008","pid":"P00620997LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Pacso Section), Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CABUGUIASAN BUILDERS","c":24445135.58,"abc":24500000.0,"fy":"2022","sd":"05/10/2022","cd":"2022-11-14","lat":16.653577,"lon":120.818763,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.01,"wp":[16.65369,120.81883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2821,2536],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22PE0007 to 22PE0009) cover the same site, together worth PHP 72,657,448.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":645},{"i":2379,"cid":"24CE0027","pid":"P00820276LZ","t":"Rehabilitation of Dike along Talavera River, Barangay San Eustacio to La Purisima, Aliaga, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / RPP 928 CONSTRUCTION CORPORATION","c":95535356.0,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.518662,"lon":120.819322,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.18,"wp":[15.51988,120.81814],"wst":"matched","br":"San Eustacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1815},{"i":2380,"cid":"22DF0019","pid":"P00621094LZ","t":"Construction of Revetment along Imus River, Brgy Palico Section, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":40959552.51,"abc":43120000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-28","lat":14.43185,"lon":120.939575,"sm":638,"fm":638,"tm":638,"am":98,"md":0.01,"ls":"boundary","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.43184,120.93954],"wst":"matched","br":"Palico Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1816},{"i":2381,"cid":"23CC0144","pid":"P00726469LZ","t":"Construction of Riverwall at Barangay Sulivan, Sta. 02+310 to Sta. 02+710, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96498859.48,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-12-05","lat":14.979458,"lon":120.888664,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":400.0,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2311,2391,2402,2419,2462,2463,2899],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":873},{"i":2382,"cid":"23CC0281","pid":"P00742324LZ","t":"Construction of Waterways and Construction of Concrete Revetment along Angat River Dampol Section, Plaridel, Bulacan K025+150-K025+350","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":49499463.32,"abc":49499971.11,"fy":"2023","sd":"03/27/2023","cd":"2023-11-21","lat":14.901025,"lon":120.819464,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.90151,120.81912],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1817},{"i":2383,"cid":"23CC0224","pid":"P00740352LZ","t":"Construction of Flood Control Structure along Balagtas River, Panginay (LS), Balagtas, Bulacan (K014+770 to K014+920)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":72374635.68,"abc":72374857.02,"fy":"2023","sd":"03/28/2023","cd":"2023-12-11","lat":14.809054,"lon":120.897435,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.80907,120.89749],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1818},{"i":2384,"cid":"23DC0083","pid":"P00742395LZ","t":"Rehabilitation of Drainage, Brgy. Poblacion, Agoncillo, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"AGONCILLO (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"VAN MAKJAY CONSTRUCTION","c":4949338.6,"abc":4950000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-08-15","lat":13.93385,"lon":120.928919,"sm":9,"fm":9,"tm":9,"am":9,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1819},{"i":2385,"cid":"24CD0107","pid":"P00825084LZ","t":"Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+356 - Sta. 02+496, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EDFROBON CONSTRUCTION SERVICES INCORPORATED","c":96499819.35,"abc":96499677.33,"fy":"2024","sd":"06/05/2024","cd":"2025-01-10","lat":14.738402,"lon":120.921402,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.09,"wp":[14.73911,120.92189],"wst":"matched","br":"Tawiran","len":140.0,"ph":null,"dup":[],"run":[2308,2317,2537,2706],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0105 to 24CD0109) cover the same site, together worth PHP 482,499,381.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.51,"value":689284,"text":"About PHP 689,284 per metre over 140 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":9},{"i":2386,"cid":"23CE0053","pid":"P00726920LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. San Jose to Brgy. Sta. Maria, Licab, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96496000.0,"abc":96500000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-01","lat":15.491298,"lon":120.78367,"sm":785,"fm":1410,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.19,"wp":[15.48972,120.78445],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":12.15,"text":"The record contradicts itself: the title and the pin point to Licab, Nueva Ecija, but the municipality field names Santo Domingo, Nueva Ecija, 12 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":452},{"i":2387,"cid":"24DC0029","pid":"P00839602LZ","t":"Construction of Drainage Canal, Barangay Poblacion 1, Laurel, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS","c":4949382.55,"abc":4950000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-06-11","lat":14.057535,"lon":120.928983,"sm":762,"fm":762,"tm":762,"am":762,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1820},{"i":2388,"cid":"22DQ0062","pid":"P00631298LZ","t":"Construction/ Rehabilitation/ Improvement of Reinforced Concrete Box Culvert along Manila-Cavite (NCR Bdry-Jct Cavite City Sect), K0018 + 953, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":9799196.02,"abc":19599972.66,"fy":"2022","sd":"04/04/2022","cd":"2023-10-24","lat":14.44815,"lon":120.93969,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1821},{"i":2389,"cid":"22OA0013","pid":"P00620353LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 18), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":49000000.0,"abc":48916982.48,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.698956,"lon":120.92145,"sm":399,"fm":399,"tm":399,"am":409,"md":0.22,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.02,"wp":[14.69885,120.92129],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 18","dup":[],"run":[2677,2725,2662,2597,2573,2490,2405,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":48},{"i":2390,"cid":"23E00026","pid":"P00736039LZ","t":"Construction of Road Dike/Esplanade along Patrick River, Barangay San Vicente Section, Sablayan, Occidental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217122476.3,"abc":217124999.5,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":12.9266,"lon":120.82,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.13,"wp":[12.92558,120.82054],"wst":"matched","br":"San Vicente Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":379},{"i":2391,"cid":"24CC0042","pid":"P00838417LZ","t":"Construction of Riverbank Protection Structure at Barangay Sulivan, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":96499932.39,"abc":96499950.8,"fy":"2024","sd":"02/07/2024","cd":"2024-09-09","lat":14.971717,"lon":120.888956,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2311,2381,2402,2419,2462,2463,2899],"L":"field","s":26,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":831},{"i":2392,"cid":"22CD0003","pid":"P00620148LZ","t":"Construction of Flood Control Structure (Ring Dike) along Pinagkabalihan River, Sta. 01+741.00 - Sta. 02+140.20, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":92639455.74,"abc":96499433.06,"fy":"2022","sd":"03/07/2022","cd":"2022-09-05","lat":14.70317,"lon":120.92911,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Pinagkabalihan","wn":"Pinagkabalian River","wd":0.03,"wp":[14.70294,120.92891],"wst":"matched","br":null,"len":399.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1822},{"i":2393,"cid":"22PF0023","pid":"P00620478LZ","t":"Construction of Gambang Flood Control, Gambang, Bakun, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAKUN (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"JUDAN BUILDERS","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-11-06","lat":16.769204,"lon":120.784004,"sm":114,"fm":114,"tm":114,"am":114,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1823},{"i":2394,"cid":"23OA0083","pid":"P00725574LZ","t":"River Improvement Works along Dampalit River, Brgy. Dampalit, Malabon","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / AL-REM KONSTRUCT INC.","c":96500000.0,"abc":96497458.4,"fy":"2023","sd":"04/19/2023","cd":"2024-12-06","lat":14.683762,"lon":120.939797,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Dampalit","wn":"Dampalit River","wd":0.01,"wp":[14.68384,120.93984],"wst":"matched","br":"Dampalit","len":null,"ph":null,"dup":[],"run":[],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":44,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":148},{"i":2395,"cid":"22CC0107","pid":"P00631189LZ","t":"Construction of Flood Control Structures along Balagtas River, K0008 + 176.20 - K0008 + 431.80, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":37239159.73,"abc":37239196.33,"fy":"2022","sd":"02/24/2022","cd":"2022-11-20","lat":14.80844,"lon":120.897458,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.80861,120.89769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1824},{"i":2396,"cid":"22OA0015","pid":"P00631021LZ","t":"Construction of Flood Control Structures (Riverwall/Road Dike) Phase 16, Barangay Dampalit, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":49000000.0,"abc":48909696.09,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.700479,"lon":120.92163,"sm":399,"fm":399,"tm":399,"am":409,"md":0.25,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 16","dup":[],"run":[2677,2725,2662,2597,2573,2490,2405,2389,2364],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":49},{"i":2397,"cid":"23CC0251","pid":"P00740343LZ","t":"Construction of Flood Control Structure at Barangay Tangos, Baliuag, Bulacan (K003+961 to K004+261)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":72374627.31,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-05","lat":14.978803,"lon":120.889023,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1825},{"i":2398,"cid":"23OA0053","pid":"P00726814LZ","t":"Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 5)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":62725000.0,"abc":62720345.05,"fy":"2023","sd":"03/22/2023","cd":"2024-05-30","lat":14.677439,"lon":120.939993,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tanza","wn":"Tanza River","wd":0.02,"wp":[14.67741,120.93985],"wst":"matched","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[2217,2230,2291,2337],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OA0049 to 23OA0053) cover the same site, together worth PHP 313,625,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":418},{"i":2399,"cid":"23PF0025","pid":"P00726410LZ","t":"Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10 + 451 - 10 + 888 (L.S), Sta. 10 + 506 - 10 + 689 (RS), Sta. 10 + 917 - 11 + 039 (L.S), Sta.\n0 + 000 - 0 + 056 (L.S), Sta. 0 + 000 - 0 + 075 (RS) and Sta.\n11 + 152 - 11 + 392 (LS), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / GELLE CONSTRUCTION SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/29/2023","cd":"2023-12-26","lat":16.730405,"lon":120.820757,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.01,"wp":[16.73041,120.82071],"wst":"matched","br":null,"len":1113.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1826},{"i":2400,"cid":"21OA0003","pid":"P00525710LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 8), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"DREAMWORX BUILDER & TRADING, INC. / QUATRIX CONSTRUCTION AND SUPPLY INC.","c":34790000.0,"abc":34789815.44,"fy":"2021","sd":"03/24/2022","cd":"2022-09-19","lat":14.692832,"lon":120.929547,"sm":399,"fm":null,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Batasan","wn":"Batasan River","wd":0.25,"wp":[14.69082,120.92842],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 8","dup":[],"run":[2347,2228,2175],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (21OA0002 to 21OA0005) cover the same site, together worth PHP 139,160,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":89},{"i":2401,"cid":"24CC0068","pid":"P00820819LZ","t":"Construction of Flood Mitigation Structure and Improvement of Waterways along Bocaue River, Barangay Bambang, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":28949931.66,"abc":28949974.76,"fy":"2024","sd":"03/20/2024","cd":"2024-10-15","lat":14.766989,"lon":120.921662,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1827},{"i":2402,"cid":"23CC0278","pid":"P00740341LZ","t":"Construction of Flood Control Structure at Barangay Sulivan, Baliuag, Bulacan (K003+821 to K004+121)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":72373564.32,"abc":72374988.4,"fy":"2023","sd":"03/28/2023","cd":"2024-02-20","lat":14.976397,"lon":120.88909,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2311,2381,2391,2419,2462,2463,2899],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":908},{"i":2403,"cid":"23E00028","pid":"P00736041LZ","t":"Construction of Tagumpay-Victoria Riverbank Protection Structure with Road Component, Sablayan, Occidental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":207472980.3,"abc":207474999.8,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.9255,"lon":120.8214,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Tagumpay-Victoria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1828},{"i":2404,"cid":"24CD0100","pid":"P00825064LZ","t":"Construction of Flood Control Structure along Meycauyan River, Sta 04+500 - Sta 04+700 (Liputan-Constantino Section, Right side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96423430.86,"abc":96499621.49,"fy":"2024","sd":"03/14/2024","cd":"2024-12-17","lat":14.738206,"lon":120.929574,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauyan","wn":"Meycauayan River","wd":0.31,"wp":[14.73578,120.9281],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2438,2558],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0099 to 24CD0101) cover the same site, together worth PHP 289,422,460.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":262},{"i":2405,"cid":"22OA0012","pid":"P00620352LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 17), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":49000000.0,"abc":48921423.86,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.698011,"lon":120.921972,"sm":399,"fm":399,"tm":399,"am":409,"md":0.21,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.01,"wp":[14.69797,120.92191],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 17","dup":[],"run":[2677,2725,2662,2597,2573,2490,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2490,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":50},{"i":2406,"cid":"22OA0072","pid":"P00631022LZ","t":"Construction of M. Blas Pumping Station including Drainage System, Brgy. Hulong Duhat, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":29398759.41,"abc":29395689.6,"fy":"2022","sd":"02/28/2022","cd":"2023-01-13","lat":14.677554,"lon":120.940003,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hulong Duhat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1829},{"i":2407,"cid":"22PE0042","pid":"P00639445LZ","t":"Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BOKOD (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"POLO ENGINEERING & CONSTRUCTION","c":19510507.33,"abc":19600000.0,"fy":"2022","sd":"06/22/2022","cd":"2022-11-29","lat":16.535236,"lon":120.784097,"sm":217,"fm":217,"tm":217,"am":217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1830},{"i":2408,"cid":"24CC0274","pid":"P00843319LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro to Purok 4), Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":77199050.27,"abc":77199950.08,"fy":"2024","sd":"04/02/2024","cd":"2024-11-27","lat":14.93156,"lon":120.897631,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1831},{"i":2409,"cid":"23OA0039","pid":"P00742223LZ","t":"Construction of Tanza Pumping Station No. 3, Tanza 2, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":19799819.78,"abc":19795322.25,"fy":"2023","sd":"03/27/2023","cd":"2023-10-20","lat":14.675114,"lon":120.940284,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1832},{"i":2410,"cid":"24CG0012","pid":"P00825097LZ","t":"Construction of Eroded Bank along Pampanga River, Barangay Cansinala, Apalit, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"ANGEL BUILDERS & CONSTRUCTION SUPPLY / FRAMECON BUILDERS","c":73322904.7,"abc":77200000.0,"fy":"2024","sd":"05/29/2024","cd":"2025-01-08","lat":14.963593,"lon":120.784172,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[14.96384,120.78381],"wst":"matched","br":"Cansinala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1833},{"i":2411,"cid":"22CC0017","pid":"P00631200LZ","t":"Construction Of River Protection - Panasahan, Malolos, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":48999585.71,"abc":48999825.71,"fy":"2022","sd":"01/28/2022","cd":"2022-09-14","lat":14.804793,"lon":120.821588,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1834},{"i":2412,"cid":"23CC0161","pid":"P00726464LZ","t":"Construction of River Control Project at Barangay Tangos, Sta. 00+300 to Sta. 00+700, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499304.28,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-11-30","lat":14.979423,"lon":120.889222,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1835},{"i":2413,"cid":"22CC0247","pid":"P00621281LZ","t":"Construction of Slope Protection along Bocaue River, Sta. 2 + 159 to Sta. 2 + 439, Bambang Section, Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":67549750.2,"abc":67549761.13,"fy":"2022","sd":"04/04/2022","cd":"2022-11-04","lat":14.775406,"lon":120.929591,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1836},{"i":2414,"cid":"24CE0329","pid":"P00844537LZ","t":"Construction of Drainage Structure, Barangay La Torre, Talavera, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":33428392.22,"abc":33766315.0,"fy":"2024","sd":"06/07/2024","cd":"2025-01-02","lat":15.567585,"lon":120.922018,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Torre","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1837},{"i":2415,"cid":"22PA0177","pid":"P00639437LZ","t":"Construction of Flood Control Structure at Barangay Poblacion, Baay-Licuan, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LICUAN-BAAY (LICUAN) (ABRA)","deo":"Abra District Engineering Office","co":"739 BUILDERS","c":48998000.0,"abc":48999929.5,"fy":"2022","sd":"07/13/2022","cd":"2023-01-19","lat":17.619919,"lon":120.897708,"sm":786,"fm":786,"tm":null,"am":786,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1838},{"i":2416,"cid":"22CD0046","pid":"P00620159LZ","t":"Construction of Flood Control Structure Mag-asawang Sapa Creek, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":67547136.97,"abc":67549339.87,"fy":"2022","sd":"03/07/2022","cd":"2022-10-26","lat":15.06369,"lon":120.94035,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Mag-asawang Sapa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1839},{"i":2417,"cid":"24CG0005","pid":"P00821286LZ","t":"Construction of Slope Protection Structure along Pampanga River, San Luis, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN LUIS (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":93604726.13,"abc":96500000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-07","lat":15.038817,"lon":120.78429,"sm":1319,"fm":1319,"tm":1319,"am":1319,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[15.03854,120.78477],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1840},{"i":2418,"cid":"23CC0079","pid":"P00736013LZ","t":"Construction of Concrete Slope Protection along Bocaue River Igulot Section (Tributary), K007 + 510 - K007 + 660, Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48249969.22,"abc":48249682.67,"fy":"2023","sd":"02/13/2023","cd":"2023-08-16","lat":14.792369,"lon":120.940658,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1841},{"i":2419,"cid":"23CC0155","pid":"P00726462LZ","t":"Construction of River Control Project at Barangay Sulivan, Sta. 01+900 to Sta. 02+300, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96498762.72,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2024-02-01","lat":14.976286,"lon":120.889329,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":400.0,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2311,2381,2391,2402,2462,2463,2899],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":874},{"i":2420,"cid":"24OA0016","pid":"P00820554LZ","t":"Construction of Riverwall along Tanza Dike (Phase 3), Barangay Tanza, Navotas City","w":"Construction of Revetment","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":48999818.48,"abc":48975647.1,"fy":"2024","sd":"02/12/2024","cd":"2024-07-25","lat":14.680696,"lon":120.929966,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1842},{"i":2421,"cid":"24CC0047","pid":"P00838391LZ","t":"Construction of Riverbank Protection Structure at Barangay Bunsuran, Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96499509.1,"abc":96499990.48,"fy":"2024","sd":"02/07/2024","cd":"2024-10-16","lat":14.855225,"lon":120.922107,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunsuran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1843},{"i":2422,"cid":"23C00191","pid":"P00725749LZ","t":"Construction of Flood Control Structure Mag-asawang Sapa Creek, San Ildefonso, Bulacan Phase 2","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":57898871.17,"abc":57899328.22,"fy":"2023","sd":"06/05/2023","cd":"2024-01-30","lat":15.096295,"lon":120.940711,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Mag-asawang Sapa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[2436],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,747,711.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":832},{"i":2423,"cid":"22CG0013","pid":"P00630061LZ","t":"Rehabilitation of Eroded Pampanga River Bank, Cansinala, Apalit, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"APALIT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":74883998.26,"abc":77200000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-10-28","lat":14.969849,"lon":120.784529,"sm":67,"fm":67,"tm":67,"am":67,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1844},{"i":2424,"cid":"23DF0038","pid":"P00737507LZ","t":"Construction of Drainage System in Barangay Wakas II, Kawit, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"T.E. TRINIDAD CONSTRUCTION","c":11758071.49,"abc":11880000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-07-29","lat":14.443103,"lon":120.897847,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wakas II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1845},{"i":2425,"cid":"24PF0037","pid":"P00845925LZ","t":"Construction of Flood Control Structure along Suyo Agno River, Amlimay, Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"ALMOND ENGINEERING & CONSTRUCTION","c":49480290.0,"abc":49500000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-08-21","lat":16.704583,"lon":120.822033,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Suyo Agno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1846},{"i":2426,"cid":"23CC0150","pid":"P00726471LZ","t":"Construction of Riverwall at Barangay Tangos, Sta. 00+710 to Sta. 001+110, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96499642.53,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2024-02-07","lat":14.976292,"lon":120.889497,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1847},{"i":2427,"cid":"23C00161","pid":"P00726891LZ","t":"Construction of Slope Protection Works at Malasik River (Mapanique Section) Barangay Mapanique, Candaba, Pampanga.","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":144750000.0,"abc":144749614.8,"fy":"2023","sd":"08/21/2023","cd":"2024-05-16","lat":15.122129,"lon":120.922258,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mapanique","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1848},{"i":2428,"cid":"23CC0007","pid":"P00726149LZ","t":"Construction of Revetment at Atlag, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":33319346.58,"abc":33319902.3,"fy":"2023","sd":"02/06/2023","cd":"2023-06-29","lat":14.828122,"lon":120.822252,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1849},{"i":2429,"cid":"24CG0151","pid":"P00839587LZ","t":"Construction of Drainage Structure, Santa Lucia, Santa Ana, Pampanga","w":"Construction of Drainage Structure","rg":"Region III","pv":"PAMPANGA","mu":"SANTA ANA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"UNI-FIVE CONSTRUCTION AND TRADING","c":4704444.99,"abc":4950000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-08-14","lat":15.09344,"lon":120.7849,"sm":1368,"fm":1368,"tm":1368,"am":1368,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1850},{"i":2430,"cid":"23CC0010","pid":"P00726158LZ","t":"Construction of Flood Control Structure along Barangay Bagna, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999864.47,"abc":48999904.49,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.828018,"lon":120.82229,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagna","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1851},{"i":2431,"cid":"23CC0253","pid":"P00740342LZ","t":"Construction of Flood Control Structure at Barangay Tangos, Baliuag, Bulacan (K003+200 to K003+500)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":72374674.87,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-05","lat":14.916222,"lon":120.889542,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1852},{"i":2432,"cid":"23AA0259","pid":"P00740514LZ","t":"Construction of Seawall, Barangay Poblacion 2, Burayoc, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":29399790.15,"abc":29399804.98,"fy":"2023","sd":"04/28/2023","cd":"2023-10-16","lat":18.577625,"lon":120.785624,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1853},{"i":2433,"cid":"24CF0088","pid":"P00846001LZ","t":"Installation of Drainage System, Sapang Rd, Brgy. Apo Esquivel, Jaen, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"JAEN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":24495731.43,"abc":24749937.78,"fy":"2024","sd":"05/17/2024","cd":"2024-12-05","lat":15.337826,"lon":120.922272,"sm":659,"fm":659,"tm":659,"am":659,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Apo Esquivel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1854},{"i":2434,"cid":"23CF0020","pid":"P00727301LZ","t":"Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 26+360.00-Sta. 26+697.60, Barangay Alua, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":72374903.94,"abc":72374973.41,"fy":"2023","sd":"03/24/2023","cd":"2023-10-10","lat":15.312602,"lon":120.897893,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.09,"wp":[15.31345,120.89786],"wst":"matched","br":"Alua","len":337.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1855},{"i":2435,"cid":"22DF0028","pid":"P00620226LZ","t":"Construction of Revetment along Julian River, Brgy. Malagasang I-E, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"C.S. RAMOS CONSTRUCTION / ALMAKAR BUILDERS & METAL WORKS","c":89745000.0,"abc":89745000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-19","lat":14.38292,"lon":120.93,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.02,"wp":[14.38284,120.93012],"wst":"matched","br":"Malagasang I-E","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":412},{"i":2436,"cid":"23C00198","pid":"P00727394LZ","t":"Construction of Flood Control Structure along Mag-Asawang Sapa Creek Phase 3, San lldefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":86848839.48,"abc":86849532.71,"fy":"2023","sd":"06/20/2023","cd":"2024-04-14","lat":15.096295,"lon":120.940711,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Mag-Asawang Sapa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[2422],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,747,711.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":802},{"i":2437,"cid":"22CC0074","pid":"P00632825LZ","t":"Rehabilitation of Drainage Canal, Barangay Bagumbayan, Bocaue, Bulacan","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":4850344.04,"abc":4949445.41,"fy":"2022","sd":"01/28/2022","cd":"2022-11-07","lat":14.7984,"lon":120.9223,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1856},{"i":2438,"cid":"24CD0099","pid":"P00825063LZ","t":"Construction of Flood Control Structure along Meycauyan River, Sta 04+300 - Sta 04+500 (Liputan-Constantino Section, Right side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499280.93,"abc":96499785.54,"fy":"2024","sd":"03/14/2024","cd":"2024-12-16","lat":14.738612,"lon":120.930092,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauyan","wn":"Meycauayan River","wd":0.38,"wp":[14.73566,120.9283],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2404,2558],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0099 to 24CD0101) cover the same site, together worth PHP 289,422,460.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":263},{"i":2439,"cid":"22DF0022","pid":"P00620877LZ","t":"Construction of Revetment along Ilang-Ilang River, Buenavista, Phase III, Gen. Trias, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":81542500.0,"abc":81542500.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-12","lat":14.323116,"lon":120.88978,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":4.17,"wp":[14.35988,120.88143],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.17,"text":"The title names Ilang-Ilang, which OpenStreetMap maps through the stated municipality, but the pin is 4.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":310},{"i":2440,"cid":"22AI0104","pid":"P00620972LZ","t":"Construction of Flood Control Structure along Cabulandayan River, Brgy. Salud, Natividad, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"NATIVIDAD (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"ORIENTAL SALES CENTER AND CONTRACTOR","c":29047823.6,"abc":29400000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-11-27","lat":16.0536,"lon":120.7861,"sm":1015,"fm":1015,"tm":1015,"am":1015,"md":0.0,"ls":"inside","ww":"Cabulandayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1857},{"i":2441,"cid":"24CC0009","pid":"P00838386LZ","t":"Construction of Riverbank Protection Structure at Barangay Atlag, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199896.46,"abc":77199973.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.828198,"lon":120.822311,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Atlag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1858},{"i":2442,"cid":"23CC0222","pid":"P00740349LZ","t":"Construction of Flood Control Structure along Balagtas River, Barangay Dalig, Balagtas, Bulacan (K006+950 to K007+148)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":72372099.18,"abc":72374293.86,"fy":"2023","sd":"03/28/2023","cd":"2023-12-04","lat":14.836957,"lon":120.922304,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.12,"wp":[14.83654,120.92329],"wst":"matched","br":"Dalig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1859},{"i":2443,"cid":"22DF0029","pid":"P00620249LZ","t":"Construction of Road Dike along Julian River, Brgy. Malagasang I-E, East Side, Imus, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":90665610.0,"abc":90665610.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-21","lat":14.3828,"lon":120.9301,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.0,"wp":[14.3828,120.93009],"wst":"matched","br":"Malagasang I-E","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1860},{"i":2444,"cid":"23CC0097","pid":"P00726485LZ","t":"Construction of River Control Project along Bocaue River, Igulot Section (Tributary), Sta. 05+280 to Sta. 05+610, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS / SYMS CONSTRUCTION TRADING","c":96499997.89,"abc":96499473.1,"fy":"2023","sd":"02/13/2023","cd":"2023-06-07","lat":14.792557,"lon":120.940876,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":330.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1861},{"i":2445,"cid":"24CC0081","pid":"P00838394LZ","t":"Construction of Riverbank Protection Structure at Barangay Cambaog (Tributary), Bustos, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":72374583.56,"abc":72374887.61,"fy":"2024","sd":"02/07/2024","cd":"2024-07-22","lat":14.930948,"lon":120.89804,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1862},{"i":2446,"cid":"22CC0235","pid":"P00621568LZ","t":"Construction of Slope Protection along Angat River, Culianin Section, Sta. 00 + 000 - Sta. 00 + 632","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":78743785.69,"abc":82024885.78,"fy":"2022","sd":"04/01/2022","cd":"2023-02-24","lat":14.921731,"lon":120.889837,"sm":1152,"fm":1152,"tm":null,"am":265,"md":0.06,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.92158,120.88965],"wst":"matched","br":null,"len":632.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1863},{"i":2447,"cid":"23CC0410","pid":"P00742320LZ","t":"Construction of Flood Control Structure (riprapping) Barangay Igulot, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":4949455.31,"abc":4949041.01,"fy":"2023","sd":"06/13/2023","cd":"2023-09-21","lat":14.793013,"lon":120.94124,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Igulot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1864},{"i":2448,"cid":"24CD0048","pid":"P00820234LZ","t":"Construction of Flood Control Structure, Sta. 00+312 - Sta. 00+416 (Tawiran-Paliwas Section), Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":144749071.8,"abc":144749213.8,"fy":"2024","sd":"02/22/2024","cd":"2024-11-18","lat":14.7158,"lon":120.930252,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":104.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"cost_per_metre_outlier","group":"risk","strength":0.5,"value":1391818,"text":"About PHP 1,391,818 per metre over 104 m, versus a median of PHP 139,997 for flood mitigation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":323},{"i":2449,"cid":"23AA0398","pid":"P00742258LZ","t":"Construction of Seawall Brgy. Poblacion 2, Burayoc, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":19799555.93,"abc":19799572.38,"fy":"2023","sd":"05/05/2023","cd":"2023-10-16","lat":18.57686,"lon":120.786606,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1865},{"i":2450,"cid":"23CC0030","pid":"P00736618LZ","t":"Construction of Flood Mitigation Structures along Barangay Taal, Pulilan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":48999988.7,"abc":48999799.64,"fy":"2023","sd":"02/06/2023","cd":"2023-07-03","lat":14.906598,"lon":120.889926,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Taal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1866},{"i":2451,"cid":"23AA0158","pid":"P00727053LZ","t":"Construction of Flood Control Structure along Baag-Pasaleng, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48999695.49,"abc":48999700.63,"fy":"2023","sd":"04/20/2023","cd":"2023-11-17","lat":18.557764,"lon":120.941321,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1867},{"i":2452,"cid":"24CF0011","pid":"P00821260LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Pambuan, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":94567339.01,"abc":96499905.21,"fy":"2024","sd":"02/12/2024","cd":"2024-05-24","lat":15.307224,"lon":120.930419,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.04,"wp":[15.30762,120.93044],"wst":"matched","br":"Pambuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1868},{"i":2453,"cid":"23CC0236","pid":"P00740364LZ","t":"Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Atlag, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":96498343.32,"abc":96499716.43,"fy":"2023","sd":"03/28/2023","cd":"2023-12-08","lat":14.828121,"lon":120.822335,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Calero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Atlag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1869},{"i":2454,"cid":"22EB0027","pid":"P00620652LZ","t":"Construction of Drainage System along Balud-Busaran Road, Sta. 0+000 - Sta. 1+709, Sablayan, Occidental Mindoro,","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":33972197.78,"abc":39200000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-11-22","lat":12.846407,"lon":120.787181,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1709.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1870},{"i":2455,"cid":"22DF0324","pid":"P00640554LZ","t":"Construction of River Wall Protection, San Sebastian, Kawit, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":21780000.0,"abc":21780000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-07","lat":14.411368,"lon":120.890212,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1871},{"i":2456,"cid":"23PI0071","pid":"P00727404LZ","t":"Construction of Flood Control Mitigation Structure, Ligab-Sumbagan along Chico River, Gonogon, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"ALPHA SIX CONSTRUCTION","c":29400000.0,"abc":29399999.6,"fy":"2023","sd":"04/10/2023","cd":"2023-09-07","lat":17.65,"lon":120.941389,"sm":227,"fm":227,"tm":227,"am":731,"md":48.47,"ls":"outside","ww":"Chico","wn":"Chico River","wd":41.4,"wp":[17.36549,121.19443],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":68,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":48.47,"text":"The pin is 48.5 km outside Bontoc, Mountain Province, the nearest municipality the record claims. It falls in Lacub, Abra.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.89,"value":41.4,"text":"The title names Chico, which OpenStreetMap maps through the stated municipality, but the pin is 41.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":53},{"i":2457,"cid":"24CC0298","pid":"P00845805LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bunsuran, Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999713.4,"abc":98999999.32,"fy":"2024","sd":"04/23/2024","cd":"2024-11-29","lat":14.857945,"lon":120.922388,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunsuran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1872},{"i":2458,"cid":"24CE0122","pid":"P00823475LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Pantoc Bulac, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"BRYAN PAUL P. PACHECO CONST. CORP.","c":19106668.98,"abc":19300000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-07-31","lat":15.640091,"lon":120.93044,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.47,"wp":[15.63761,120.93402],"wst":"matched","br":"Pantoc Bulac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1873},{"i":2459,"cid":"23CC0320","pid":"P00727357LZ","t":"Construction of River Protection along Angat River, K009 + 520 to K009 + 670, Tiaong, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"CEDAR CONSTRUCTION","c":48999068.63,"abc":48999213.44,"fy":"2023","sd":"03/07/2023","cd":"2023-07-18","lat":14.941854,"lon":120.898139,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.9417,120.89833],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1874},{"i":2460,"cid":"23CC0003","pid":"P00726159LZ","t":"Construction of Flood Control Structure along Barangay Panasahan, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.G. FRANCISCO CONSTRUCTION","c":48999979.94,"abc":48999711.67,"fy":"2023","sd":"02/06/2023","cd":"2023-06-05","lat":14.81916,"lon":120.823014,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panasahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1875},{"i":2461,"cid":"21EB0086","pid":"P00561805LZ","t":"Construction of Flood Protection Dike, Barangay Claudio Salgado, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Sablayan","deo":"Mindoro Occidental District Engineering Office","co":"JRMX CONSTRUCTION & GENERAL MERCHANDISE","c":18802621.46,"abc":19800000.0,"fy":"2021","sd":"03/22/2021","cd":"2022-10-20","lat":12.959916,"lon":120.787476,"sm":1228,"fm":null,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Claudio Salgado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1876},{"i":2462,"cid":"23CC0057","pid":"P00736010LZ","t":"Construction of Concrete Slope Protection at Barangay Sulivan, K003 + 350 - K003 + 550, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":38599056.57,"abc":38599729.27,"fy":"2023","sd":"02/13/2023","cd":"2023-06-22","lat":14.974819,"lon":120.890263,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[2463],"run":[],"cl":[2159,2190,2271,2311,2381,2391,2402,2419,2463,2899],"L":"field","s":37,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 110,973,207.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":419},{"i":2463,"cid":"23CC0279","pid":"P00740340LZ","t":"Construction of Flood Control Structure at Barangay Sulivan, Baliuag, Bulacan (K003+770 to K004+070)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":72374149.96,"abc":72374988.4,"fy":"2023","sd":"03/28/2023","cd":"2023-12-12","lat":14.974819,"lon":120.890263,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":null,"ph":null,"dup":[2462],"run":[],"cl":[2159,2190,2271,2311,2381,2391,2402,2419,2462,2899],"L":"field","s":43,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 110,973,207.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":163},{"i":2464,"cid":"24CE0015","pid":"P00820273LZ","t":"Rehabilitation of Dike along Talavera River, Barangay Dolores, Santo Domingo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":95523979.74,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.556841,"lon":120.890313,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.13,"wp":[15.55603,120.89124],"wst":"matched","br":"Dolores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1877},{"i":2465,"cid":"23CC0021","pid":"P00727127LZ","t":"Construction of Flood Control Structure at Barangay Buguion - Sergio Bayan - Balite - San Marcos - Palimbang, Calumpit, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":39192632.83,"abc":39199829.45,"fy":"2023","sd":"02/06/2023","cd":"2023-08-15","lat":14.905442,"lon":120.787611,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buguion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1878},{"i":2466,"cid":"23E00018","pid":"P00726598LZ","t":"Construction of Flood Control Structure at Lumintao River, Sitio Lumintao, Barangay Malawaan, Sta. 0+000 - Sta. 0+800, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / D.T. RECIO INCORPORATED","c":193730726.8,"abc":193736209.4,"fy":"2023","sd":"04/13/2023","cd":"2023-12-10","lat":12.51615,"lon":120.9416,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.15,"wp":[12.51611,120.94022],"wst":"matched","br":"Malawaan","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1879},{"i":2467,"cid":"22CD0087","pid":"P00639347LZ","t":"Construction of Flood Mitigation Structure along Meycauayan River (Liputan - Nagbalon), Sta. 04+400 - Sta. 04+800, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96497603.14,"abc":96499091.88,"fy":"2022","sd":"06/09/2022","cd":"2023-07-31","lat":14.73483,"lon":120.9309,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.05,"wp":[14.73444,120.93073],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1880},{"i":2468,"cid":"24CC0269","pid":"P00845985LZ","t":"Improvement/Rehabilitation of Waterways, Brgy. Panasahan, Malolos City, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":74248363.79,"abc":74249963.15,"fy":"2024","sd":"04/02/2024","cd":"2024-11-12","lat":14.814467,"lon":120.823138,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panasahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1881},{"i":2469,"cid":"22CC0232","pid":"P00632696LZ","t":"Construction of Flood Control Structure along Balagtas River (Phase 2), Barangay Malibong, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":59396408.04,"abc":59399331.24,"fy":"2022","sd":"03/07/2022","cd":"2022-11-01","lat":14.841563,"lon":120.922615,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.84158,120.92258],"wst":"matched","br":"Malibong","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1882},{"i":2470,"cid":"23CF0059","pid":"P00727304LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sto. Niño, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":96499920.0,"abc":96499989.02,"fy":"2023","sd":"03/27/2023","cd":"2023-08-24","lat":15.309306,"lon":120.941674,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.12,"wp":[15.30969,120.94066],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1883},{"i":2471,"cid":"24CC0369","pid":"P00825068LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Barangay San Pedro (Purok 2), Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":77198882.23,"abc":77199954.28,"fy":"2024","sd":"04/23/2024","cd":"2024-11-27","lat":14.938267,"lon":120.898189,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.09,"wp":[14.93836,120.89733],"wst":"matched","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1884},{"i":2472,"cid":"23DF0008","pid":"P00725805LZ","t":"Construction of Revetment along Julian River, Barangay Malagasang I-D, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"MONTADEL ENTERPRISES","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-11-14","lat":14.387558,"lon":120.930903,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.0,"wp":[14.38756,120.93094],"wst":"matched","br":"Malagasang I-D","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1885},{"i":2473,"cid":"22CE0076","pid":"P00632832LZ","t":"Construction of Flood Mitigation Structure at Malayop Creek, Barangay Bertese, Quezon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":11760000.0,"abc":11760000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-12","lat":15.570941,"lon":120.823139,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Malayop","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bertese","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1886},{"i":2474,"cid":"22CC0187","pid":"P00639350LZ","t":"Construction of Riverbank Protection along Balagtas River Brgy. Santol, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":57899969.25,"abc":57899762.54,"fy":"2022","sd":"04/04/2022","cd":"2023-02-27","lat":14.855417,"lon":120.922754,"sm":117,"fm":117,"tm":117,"am":1084,"md":0.02,"ls":"boundary","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.85551,120.92269],"wst":"matched","br":"Santol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1887},{"i":2475,"cid":"24AA0191","pid":"P00844700LZ","t":"Construction of Seawall, Poblacion 2, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY / RED JEWEL BUILDERS","c":48999907.06,"abc":48999920.64,"fy":"2024","sd":"02/23/2024","cd":"2024-08-19","lat":18.570465,"lon":120.787935,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1888},{"i":2476,"cid":"21PF0022","pid":"P00525907LZ","t":"Construction of Taneg Flood Control Sta. 13+995 - Sta. 14+319 (R.S.), Sta 14+010 - Sta 14+358 (L.S.), Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Mankayan","deo":"Benguet 2nd District Engineering Office","co":"MALCO CONSTRUCTION","c":23831587.47,"abc":29400000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-12-14","lat":16.787925,"lon":120.787953,"sm":921,"fm":null,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":672.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1889},{"i":2477,"cid":"24CC0006","pid":"P00838378LZ","t":"Construction of Riverbank Protection Structure along Balagtas River, Barangay San Juan, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96499958.97,"abc":96499973.3,"fy":"2024","sd":"02/07/2024","cd":"2024-09-18","lat":14.813588,"lon":120.898245,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.81379,120.89816],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1890},{"i":2478,"cid":"23DQ0013","pid":"P00726754LZ","t":"Construction of Revetment (Reinforced Concrete) along Imus River, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"AARCON BUILDERS","c":47518195.33,"abc":47529993.16,"fy":"2023","sd":"02/15/2023","cd":"2023-10-12","lat":14.44277,"lon":120.93096,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.01,"wp":[14.44276,120.93083],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1891},{"i":2479,"cid":"24CC0396","pid":"P00825072LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Culianin Section (Purok 2), Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199815.33,"abc":77199945.38,"fy":"2024","sd":"04/23/2024","cd":"2024-08-02","lat":14.921101,"lon":120.890699,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.92087,120.89023],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1892},{"i":2480,"cid":"23DC0174","pid":"P00746107LZ","t":"Rehabilltation/Reconstruction of Subic Bridge River Revetment, Barangay Subic, Agoncillo Batangas K0115+838","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"AGONCILLO (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS","c":3666700.0,"abc":3667000.0,"fy":"2023","sd":"01/05/2024","cd":"2024-04-03","lat":13.944901,"lon":120.941865,"sm":9,"fm":9,"tm":null,"am":9,"md":0.0,"ls":"inside","ww":"Subic Bridge","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Subic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1893},{"i":2481,"cid":"24CC0293","pid":"P00843320LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro), Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199023.96,"abc":77199978.44,"fy":"2024","sd":"04/16/2024","cd":"2024-06-24","lat":14.931003,"lon":120.898317,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1894},{"i":2482,"cid":"24CC0071","pid":"P00820244LZ","t":"Construction of Revetment at Barangay Palimbang-San Marcos-Balite-Sergio Bayan, Calumpit, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PTM DEVELOPMENT CORP.","c":57892233.56,"abc":57899980.17,"fy":"2024","sd":"02/07/2024","cd":"2024-08-08","lat":14.900409,"lon":120.788073,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palimbang-San Marcos-Balite-Sergio Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1895},{"i":2483,"cid":"22CE0077","pid":"P00632833LZ","t":"Construction of Flood Mitigation Structure at Malayop Creek, Barangay Ilog Baliwag, Quezon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":11431950.66,"abc":11760000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-12","lat":15.570823,"lon":120.823282,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Baliwag","wn":"Baliwag River","wd":3.27,"wp":[15.58664,120.79752],"wst":"matched","br":"Ilog Baliwag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.27,"text":"The title names Baliwag, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":453},{"i":2484,"cid":"23CC0089","pid":"P00726479LZ","t":"Construction of River Control Project along Balagtas River, Santol, Sta. 01+500 - Sta. 01+850, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96496501.75,"abc":96499523.36,"fy":"2023","sd":"02/13/2023","cd":"2023-09-01","lat":14.856402,"lon":120.922798,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.85642,120.92291],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[2503,2512,2557,2493,2507],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":264},{"i":2485,"cid":"23CC0219","pid":"P00742134LZ","t":"Construction (Improvement) of Slope Protection Structure and Waterways at Barangay Panasahan, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":74249313.37,"abc":74249789.19,"fy":"2023","sd":"03/28/2023","cd":"2023-12-06","lat":14.817079,"lon":120.823365,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panasahan","len":null,"ph":null,"dup":[2497],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 143,537,480.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":833},{"i":2486,"cid":"23CC0101","pid":"P00740373LZ","t":"Construction of Flood Mitigation Structures along Barangay San Roque, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77197446.53,"abc":77199922.45,"fy":"2023","sd":"03/28/2023","cd":"2023-12-27","lat":14.827288,"lon":120.788529,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1896},{"i":2487,"cid":"23CG0079","pid":"P00726914LZ","t":"Construction of Damage Dike with Concrete Slope Protection works including River training works at Maasim River, Phase I, barangay Vizal San Pablo, Candaba Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68321554.89,"abc":72375000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-01-25","lat":15.036575,"lon":120.890761,"sm":318,"fm":318,"tm":null,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.02,"wp":[15.03648,120.89089],"wst":"matched","br":"Vizal San Pablo","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1897},{"i":2488,"cid":"23DB0057","pid":"P00737490LZ","t":"Construction of Canal, Taal, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TAAL (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON","c":5938760.0,"abc":5938760.0,"fy":"2023","sd":"03/24/2023","cd":"2023-06-21","lat":13.892732,"lon":120.931084,"sm":1500,"fm":1500,"tm":1500,"am":1500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1898},{"i":2489,"cid":"22CC0057","pid":"P00631198LZ","t":"Construction Of River Protection - Malumot, Paombong, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":44099245.32,"abc":44099219.73,"fy":"2022","sd":"01/28/2022","cd":"2022-09-24","lat":14.827271,"lon":120.788672,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1899},{"i":2490,"cid":"22OA0011","pid":"P00620351LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 16), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"B. BERNARDO CONST., INC.","c":49000000.0,"abc":48904843.78,"fy":"2022","sd":"02/14/2022","cd":"2022-11-16","lat":14.69761,"lon":120.922808,"sm":399,"fm":399,"tm":399,"am":409,"md":0.17,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.02,"wp":[14.69743,120.92272],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 16","dup":[],"run":[2677,2725,2662,2597,2573,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2563,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":51},{"i":2491,"cid":"23CC0077","pid":"P00736014LZ","t":"Construction of Concrete Slope Protection along Balagtas River Panginay (RS), K018 + 200 - K018 + 405, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48248648.06,"abc":48249571.88,"fy":"2023","sd":"02/13/2023","cd":"2023-10-10","lat":14.807556,"lon":120.898444,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.80761,120.89851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2529,2377],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0075 to 23CC0078) cover the same site, together worth PHP 202,647,663.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":547},{"i":2492,"cid":"23DF0009","pid":"P00725804LZ","t":"Construction of Road Dike along Julian River, Barangay Bucandala, Imus, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"02/19/2023","cd":"2024-01-13","lat":14.384397,"lon":120.931089,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.13,"wp":[14.38352,120.93032],"wst":"matched","br":"Bucandala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1900},{"i":2493,"cid":"23CC0092","pid":"P00726491LZ","t":"Construction of River Control Project along Balagtas River, Panginay (LS), Sta. 13+090 - Sta. 13+295, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96499913.18,"abc":96499396.54,"fy":"2023","sd":"02/13/2023","cd":"2023-08-22","lat":14.803705,"lon":120.898547,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.04,"wp":[14.80343,120.89872],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2503,2484,2512,2557,2507],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":204},{"i":2494,"cid":"21C00079","pid":"P00561468LZ","t":"Improvement of River along Balagtas River, Pandi Section, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Pandi","deo":"Bulacan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":142350971.2,"abc":144749403.6,"fy":"2021","sd":"11/29/2021","cd":"2023-12-05","lat":14.840426,"lon":120.922828,"sm":1084,"fm":null,"tm":1084,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.84044,120.92285],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1901},{"i":2495,"cid":"24OA0042","pid":"P00839457LZ","t":"Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 1), Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":69298883.78,"abc":69298188.53,"fy":"2024","sd":"02/21/2024","cd":"2024-10-21","lat":14.682593,"lon":120.941938,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Dampalit","wn":"Dampalit River","wd":0.02,"wp":[14.68274,120.94202],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[2603,2740],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0042 to 24OA0044) cover the same site, together worth PHP 188,096,203.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":420},{"i":2496,"cid":"21AA0094","pid":"P00561449LZ","t":"Construction/Rehabilitation of Flood Control Structure along Jalao River Tributaries, Barangay Saud, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Pagudpud","deo":"Ilocos Norte 1st District Engineering Office","co":"FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS)","c":96499801.28,"abc":96499801.86,"fy":"2021","sd":"12/24/2021","cd":"2022-09-05","lat":18.590343,"lon":120.78871,"sm":1062,"fm":null,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Jalao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Saud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1902},{"i":2497,"cid":"23CC0220","pid":"P00742156LZ","t":"Construction of Flood Mitigation Structures along Bgry. Panasahan, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":69288166.96,"abc":69299956.56,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.817079,"lon":120.823365,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[2485],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 143,537,480.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":834},{"i":2498,"cid":"24CC0213","pid":"P00845973LZ","t":"Construction of Drainage System along Taal-Caingin Road, Bocaue, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC","c":24749402.32,"abc":24749834.81,"fy":"2024","sd":"03/11/2024","cd":"2024-07-08","lat":14.801,"lon":120.92289,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1903},{"i":2499,"cid":"22OA0108","pid":"P00621270LZ","t":"Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 4, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96499355.46,"abc":96483205.69,"fy":"2022","sd":"03/24/2022","cd":"2023-03-13","lat":14.659688,"lon":120.942009,"sm":409,"fm":409,"tm":409,"am":409,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[2514],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,999,071.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":746},{"i":2500,"cid":"22CC0037","pid":"P00620518LZ","t":"Construction of Flood Control Structures along Balagtas River, Sta. 0 + 475 - Sta. 0 + 829, Barangay Panginay, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES","c":47039817.09,"abc":48999809.79,"fy":"2022","sd":"01/28/2022","cd":"2022-09-24","lat":14.816575,"lon":120.898587,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.29,"wp":[14.81398,120.89876],"wst":"matched","br":"Panginay","len":354.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1904},{"i":2501,"cid":"23DQ0022","pid":"P00726558LZ","t":"Construction of Revetment along Imus River, Barangay Salinas I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96458053.16,"abc":96499995.54,"fy":"2023","sd":"03/08/2023","cd":"2024-03-31","lat":14.44614,"lon":120.93117,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.02,"wp":[14.44604,120.93105],"wst":"matched","br":"Salinas I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1905},{"i":2502,"cid":"22OD0103","pid":"P00620412LZ","t":"Construction of Wawang Pulo Pumping Station Perimeter Riverwall, Brgy. Wawang Pulo, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":20898647.14,"abc":21544226.33,"fy":"2022","sd":"02/08/2022","cd":"2022-09-15","lat":14.733655,"lon":120.931243,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wawang Pulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1906},{"i":2503,"cid":"23CC0088","pid":"P00726481LZ","t":"Construction of River Control Project along Balagtas River, Panginay (Tributary), Sta. 15+060 - Sta. 15+265, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499702.0,"abc":96499879.6,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":14.815945,"lon":120.898636,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.22,"wp":[14.81398,120.89876],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2484,2512,2557,2493,2507],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":265},{"i":2504,"cid":"22D00087","pid":"P00621583LZ","t":"Construction of Revetment along Canas River, Barangay Buenavista, General Trias, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":144733536.2,"abc":144750000.0,"fy":"2022","sd":"01/10/2023","cd":"2023-12-28","lat":14.31338,"lon":120.89088,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Canas","wn":"Cañas River","wd":1.17,"wp":[14.30313,120.89336],"wst":"matched","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1907},{"i":2505,"cid":"21PF0024","pid":"P00525909LZ","t":"Construction of Sapid Flood Control Sta. 5+779 - Sta. 6+019 (R.S.), Mankayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Mankayan","deo":"Benguet 2nd District Engineering Office","co":"DONATO - SAKIWAT CONSTRUCTION","c":9750603.31,"abc":9800000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-07-02","lat":16.841564,"lon":120.789133,"sm":921,"fm":null,"tm":921,"am":921,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1908},{"i":2506,"cid":"23OD0057","pid":"P00725992LZ","t":"Construction of Flood Control River Wall along Meycauayan River Coloong-Wawang Pulo (Phase 2), Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":44100000.0,"abc":44080512.13,"fy":"2023","sd":"02/21/2023","cd":"2023-12-17","lat":14.733596,"lon":120.931248,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.06,"wp":[14.73413,120.93148],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1909},{"i":2507,"cid":"23CC0093","pid":"P00726490LZ","t":"Construction of Riverwall along Balagtas River, Panginay (RS) , Sta. 16+520 to Sta. 16+725, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96497777.93,"abc":96499429.13,"fy":"2023","sd":"02/13/2023","cd":"2023-08-22","lat":14.8165,"lon":120.898754,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.28,"wp":[14.81398,120.89876],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2503,2484,2512,2557,2493],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":266},{"i":2508,"cid":"23CC0072","pid":"P00737453LZ","t":"Construction of Drainage Canal, Pagala, Baliuag, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":4836095.72,"abc":4949493.42,"fy":"2023","sd":"02/06/2023","cd":"2023-04-04","lat":14.967325,"lon":120.890983,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1910},{"i":2509,"cid":"22PF0022","pid":"P00620477LZ","t":"Construction of Central Buguias Flood Control along Agno River, Poblacion, Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"BTCJR CONSTRUCTION AND ENGINEERING SERVICES","c":24469548.92,"abc":24500000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-11-24","lat":16.714921,"lon":120.823798,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.02,"wp":[16.71499,120.82397],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1911},{"i":2510,"cid":"24CC0395","pid":"P00825073LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Culianin Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":77199805.7,"abc":77199968.98,"fy":"2024","sd":"04/23/2024","cd":"2024-08-13","lat":14.919213,"lon":120.891035,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.91914,120.89062],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1912},{"i":2511,"cid":"24CC0297","pid":"P00845789LZ","t":"Construction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999508.95,"abc":98999851.21,"fy":"2024","sd":"04/23/2024","cd":"2025-01-02","lat":14.856419,"lon":120.923026,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunsuran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1913},{"i":2512,"cid":"23CC0090","pid":"P00726482LZ","t":"Construction of River Control Project along Balagtas River, San Juan, Sta. 09+600 - Sta. 09+805, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499923.27,"abc":96499358.66,"fy":"2023","sd":"02/13/2023","cd":"2023-12-04","lat":14.807397,"lon":120.899004,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.80725,120.89883],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2503,2484,2557,2493,2507],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":205},{"i":2513,"cid":"23AA0132","pid":"P00725629LZ","t":"Construction of Flood Control Structure along Burayoc River, Downstream, Brgy. Burayoc, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY","c":57899998.85,"abc":58799849.67,"fy":"2023","sd":"03/13/2023","cd":"2023-11-17","lat":18.577263,"lon":120.789316,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Burayoc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Burayoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1914},{"i":2514,"cid":"22OA0109","pid":"P00621271LZ","t":"Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 5, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96499715.98,"abc":96491043.33,"fy":"2022","sd":"03/24/2022","cd":"2023-03-13","lat":14.659688,"lon":120.942009,"sm":409,"fm":409,"tm":409,"am":409,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[2499],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,999,071.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":747},{"i":2515,"cid":"24CE0028","pid":"P00820277LZ","t":"Rehabilitation of Dike along Talavera River, Barangay Santa Maria to Aquino, Licab, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LICAB (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / BRYAN PAUL P. PACHECO CONST. CORP.","c":95534944.05,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-10-10","lat":15.496216,"lon":120.789664,"sm":785,"fm":785,"tm":785,"am":785,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.25,"wp":[15.49458,120.79122],"wst":"matched","br":"Santa Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1915},{"i":2516,"cid":"22OD0043","pid":"P00620081LZ","t":"Improvement of Flood Control River Wall along Left Bank of Polo River, Barangay Wawang Pulo, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":89832638.99,"abc":91655826.07,"fy":"2022","sd":"02/11/2022","cd":"2023-02-10","lat":14.73139,"lon":120.931262,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Polo","wn":"Polo River","wd":0.04,"wp":[14.73151,120.93157],"wst":"matched","br":"Wawang Pulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1916},{"i":2517,"cid":"23CC0106","pid":"P00740372LZ","t":"Construction of Flood Mitigation Structures along Barangay San Jose, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":77198857.79,"abc":77199940.5,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.824579,"lon":120.790162,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1917},{"i":2518,"cid":"24CE0331","pid":"P00844538LZ","t":"Construction of Drainage Structure, Barangay Malasin, Santo Domingo, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.S.C. CONSTRUCTION SERVICES","c":4776807.36,"abc":4825000.0,"fy":"2024","sd":"06/14/2024","cd":"2024-08-12","lat":15.594176,"lon":120.891473,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1918},{"i":2519,"cid":"24CC0048","pid":"P00838390LZ","t":"Construction of Riverbank Protection Structure at Barangay Bunsuran (Phase II), Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96499112.67,"abc":96499815.35,"fy":"2024","sd":"02/07/2024","cd":"2024-10-16","lat":14.856278,"lon":120.923042,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunsuran","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1919},{"i":2520,"cid":"22PA0040","pid":"P00620986LZ","t":"Construction of Flood Control Structure along Abra River, Sta. 25+800 -Sta. 26+300, Cabaruyan, Daguioman, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"DAGUIOMAN (ABRA)","deo":"Abra District Engineering Office","co":"A.D. MARRERO GENERAL CONSTRUCTION","c":48997987.95,"abc":48999938.86,"fy":"2022","sd":"02/17/2022","cd":"2022-07-22","lat":17.448924,"lon":120.899062,"sm":474,"fm":474,"tm":474,"am":474,"md":0.0,"ls":"inside","ww":"Abra","wn":"Abra River","wd":20.37,"wp":[17.50056,120.71506],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1920},{"i":2521,"cid":"22CC0207","pid":"P00621451LZ","t":"Rehabilitation of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":14699022.84,"abc":14699992.17,"fy":"2022","sd":"04/04/2022","cd":"2022-09-30","lat":14.823985,"lon":120.823985,"sm":117,"fm":117,"tm":117,"am":401,"md":7.16,"ls":"outside","ww":"Balagtas","wn":"Balagtas River","wd":7.98,"wp":[14.81229,120.89716],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.78,"value":7.16,"text":"The pin is 7.2 km outside Balagtas, Bulacan, the nearest municipality the record claims. It falls in City of Malolos, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.65,"value":7.98,"text":"The title names Balagtas, which OpenStreetMap maps through the stated municipality, but the pin is 8.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":148},{"i":2522,"cid":"23DQ0033","pid":"P00725816LZ","t":"Construction of Revetment along Bacoor River, Barangay Habay I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":96495747.2,"abc":96499994.4,"fy":"2023","sd":"02/21/2023","cd":"2023-11-02","lat":14.45371,"lon":120.94203,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.45358,120.94201],"wst":"matched","br":"Habay I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1921},{"i":2523,"cid":"23EB0034","pid":"P00727375LZ","t":"Construction of Flood Control Structure along Amnay River, Ilvita Section, Sta. 0 + 000 - Sta. 0 + 314, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":45079792.51,"abc":45080000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-11-15","lat":12.95665,"lon":120.82417,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.16,"wp":[12.9553,120.8236],"wst":"matched","br":null,"len":314.0,"ph":null,"dup":[],"run":[2057,2058,2841],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23EB0032 to 23EB0035) cover the same site, together worth PHP 178,999,585.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":578},{"i":2524,"cid":"24CC0084","pid":"P00821271LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay San Jose, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"BELL CONSTRUCTION","c":72373026.04,"abc":72374199.16,"fy":"2024","sd":"02/07/2024","cd":"2024-08-12","lat":14.90713,"lon":120.891506,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90742,120.89129],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1922},{"i":2525,"cid":"24CD0001","pid":"P00820208LZ","t":"Construction of Flood Control Structure along Meycauayan River, Sta. 01+950 - Sta. 02+100 (Liputan - Ubihan Section), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":67549934.92,"abc":67549591.85,"fy":"2024","sd":"02/14/2024","cd":"2025-01-08","lat":14.739469,"lon":120.923045,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.1,"wp":[14.7387,120.92251],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[2316,2328,2371,2621],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0001 to 24CD0005) cover the same site, together worth PHP 337,734,367.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":421},{"i":2526,"cid":"23DF0023","pid":"P00726210LZ","t":"Construction of Revetment along Julian River, Barangay Malagasang I-A, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FROMARC BUILDERS & GEN. MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-09-21","lat":14.397322,"lon":120.931367,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.39733,120.93147],"wst":"matched","br":"Malagasang I-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1923},{"i":2527,"cid":"23CC0006","pid":"P00740593LZ","t":"Construction of Flood Mitigation Structures along Barangay Sto. Rosario, Paombong, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":48999664.71,"abc":48999861.74,"fy":"2023","sd":"03/21/2023","cd":"2023-11-15","lat":14.844474,"lon":120.790314,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1924},{"i":2528,"cid":"22DC0092","pid":"P00620001LZ","t":"Construction of Flood Mitigation Structures (Outfall) along Bugaan East, Laurel, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"GAWANATO CONSTRUCTION CORPORATION / N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION","c":39197310.0,"abc":39200000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-11-11","lat":14.04987,"lon":120.942038,"sm":762,"fm":762,"tm":762,"am":762,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1925},{"i":2529,"cid":"23CC0075","pid":"P00726489LZ","t":"Construction of Riverwall along Balagtas River, Panginay (Tributary Section) Sta. 15+270 to Sta. 15+475, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96499467.81,"abc":96499574.6,"fy":"2023","sd":"02/13/2023","cd":"2023-08-22","lat":14.81537,"lon":120.89914,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.15,"wp":[14.81398,120.89913],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2491,2377],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0075 to 23CC0078) cover the same site, together worth PHP 202,647,663.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":267},{"i":2530,"cid":"22AA0143","pid":"P00639415LZ","t":"Construction of Flood Mitigating Structure along Bislak River, Barangay Canaam, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ASIAN PEARL CONSTRUCTION & DEVT. CORP.","c":48346397.71,"abc":48999333.79,"fy":"2022","sd":"04/04/2022","cd":"2022-12-19","lat":18.306637,"lon":120.792011,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Canaam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1926},{"i":2531,"cid":"23CF0065","pid":"P00727305LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Brgy. San Vicente, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC. / N.C. AGUILAR CONST. & SUPPLY INC.","c":96499967.4,"abc":96499970.57,"fy":"2023","sd":"03/24/2023","cd":"2023-06-13","lat":15.309645,"lon":120.94217,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.15,"wp":[15.30998,120.94077],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1927},{"i":2532,"cid":"24DF0153","pid":"P00820344LZ","t":"Construction of Revetment along Julian River, Barangay Malagasang 2-A, West Side, Imus, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-12-06","lat":14.37345,"lon":120.931419,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.37341,120.93146],"wst":"matched","br":"Malagasang 2-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1928},{"i":2533,"cid":"23CC0118","pid":"P00736004LZ","t":"Construction of Revetment at Taal, Pulilan, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":28949154.09,"abc":28949608.55,"fy":"2023","sd":"02/13/2023","cd":"2023-05-16","lat":14.908167,"lon":120.891585,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1929},{"i":2534,"cid":"24CC0208","pid":"P00845974LZ","t":"Construction of Drainage System, Barangay Wakas, Bocaue, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC","c":4949180.63,"abc":4949682.88,"fy":"2024","sd":"03/11/2024","cd":"2024-06-03","lat":14.799028,"lon":120.923172,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wakas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1930},{"i":2535,"cid":"22OA0062","pid":"P00620011LZ","t":"Closing of Gaps along Malabon-Navotas & Tullahan River, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":90661657.44,"abc":92104372.56,"fy":"2022","sd":"02/21/2022","cd":"2023-02-15","lat":14.672492,"lon":120.942221,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":1.15,"wp":[14.67092,120.95281],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1931},{"i":2536,"cid":"22PE0009","pid":"P00620996LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Mangkew-Nabneng, LS), Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CABUGUIASAN BUILDERS","c":24447245.69,"abc":24500000.0,"fy":"2022","sd":"01/31/2022","cd":"2022-07-29","lat":16.670524,"lon":120.824985,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.03,"wp":[16.67022,120.82494],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2821,2378],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22PE0007 to 22PE0009) cover the same site, together worth PHP 72,657,448.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":646},{"i":2537,"cid":"24CD0108","pid":"P00825085LZ","t":"Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+496 - Sta. 02+636, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96499915.95,"abc":96499964.52,"fy":"2024","sd":"04/22/2024","cd":"2024-11-26","lat":14.737299,"lon":120.923321,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.09,"wp":[14.73802,120.92369],"wst":"matched","br":"Tawiran","len":140.0,"ph":null,"dup":[],"run":[2308,2317,2385,2706],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0105 to 24CD0109) cover the same site, together worth PHP 482,499,381.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.51,"value":689285,"text":"About PHP 689,285 per metre over 140 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":10},{"i":2538,"cid":"23CC0147","pid":"P00726465LZ","t":"Construction of River Control Project along Angat River, San Jose Tributary Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":96498661.72,"abc":96499724.83,"fy":"2023","sd":"02/13/2023","cd":"2023-05-24","lat":14.906947,"lon":120.89161,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.90741,120.89127],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1932},{"i":2539,"cid":"24CF0026","pid":"P00825057LZ","t":"Construction of Flood Control Structure along Peñaranda River, Barangay San Nicolas, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / R.G. DELA CRUZ CONSTRUCTION","c":94569740.12,"abc":96499992.23,"fy":"2024","sd":"04/02/2024","cd":"2024-06-18","lat":15.3065,"lon":120.93146,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.12,"wp":[15.30757,120.93151],"wst":"matched","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1933},{"i":2540,"cid":"23AA0295","pid":"P00740550LZ","t":"Construction of Flood Control Structure along Abot Creek (Down Stream), Barangay Malasin, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ZEDIK BUILDERS","c":16169714.94,"abc":16169715.39,"fy":"2023","sd":"05/05/2023","cd":"2023-09-20","lat":18.529011,"lon":120.79204,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Abot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1934},{"i":2541,"cid":"23CC0121","pid":"P00736006LZ","t":"Construction of Revetment at San Jose, Paombong, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":28949739.38,"abc":28949821.3,"fy":"2023","sd":"02/13/2023","cd":"2023-05-29","lat":14.821856,"lon":120.792561,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1935},{"i":2542,"cid":"21EB0057","pid":"P00526447LZ","t":"Construction of Flood Control Structure, Amnay River, Ilvita Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Sablayan","deo":"Mindoro Occidental District Engineering Office","co":"DELPAR CONSTRUCTION & SUPPLIES","c":40925466.93,"abc":44100000.0,"fy":"2021","sd":"03/22/2021","cd":"2022-08-22","lat":12.957519,"lon":120.825251,"sm":1228,"fm":null,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.29,"wp":[12.95502,120.82434],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1936},{"i":2543,"cid":"22CC0106","pid":"P00632697LZ","t":"Construction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":69295690.87,"abc":69299553.79,"fy":"2022","sd":"02/24/2022","cd":"2022-11-20","lat":14.839588,"lon":120.923489,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.83959,120.92348],"wst":"matched","br":"Malibong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1937},{"i":2544,"cid":"24CE0026","pid":"P00820278LZ","t":"Rehabilitation of Dike along Talavera River, Barangays San Carlos to Bibiclat, Aliaga, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / RPP 928 CONSTRUCTION CORPORATION","c":95525406.04,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.552142,"lon":120.899368,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.67,"wp":[15.55733,120.89608],"wst":"matched","br":"San Carlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1938},{"i":2545,"cid":"22PA0051","pid":"P00632758LZ","t":"Construction of Bua Flood Control Structure, Barangay Poblacion, Lacub, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"LACUB (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":46607719.18,"abc":48999991.34,"fy":"2022","sd":"03/01/2022","cd":"2022-09-03","lat":17.66523,"lon":120.942318,"sm":731,"fm":731,"tm":731,"am":731,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1939},{"i":2546,"cid":"23CC0323","pid":"P00727359LZ","t":"Construction of River Protection along Angat River, K008 + 210 to K008 + 360, barangay San Jose, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"CEDAR CONSTRUCTION","c":48999152.97,"abc":48999213.44,"fy":"2023","sd":"03/07/2023","cd":"2023-09-20","lat":14.942915,"lon":120.899563,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.01,"wp":[14.94285,120.89965],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1940},{"i":2547,"cid":"23CF0018","pid":"P00726735LZ","t":"Construction of Flood Control Structure along Pampanga River, Barangay Bagong Sikat, Cabiao, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABIAO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"D.B. BARAQUIEL CONSTRUCTION","c":28666092.37,"abc":29399953.8,"fy":"2023","sd":"02/07/2023","cd":"2023-08-18","lat":15.2481,"lon":120.8261,"sm":278,"fm":278,"tm":278,"am":278,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.1,"wp":[15.24762,120.82686],"wst":"matched","br":"Bagong Sikat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1941},{"i":2548,"cid":"23E00032","pid":"P00736045LZ","t":"Construction of Claudio Salgado Riverbank Protection Works along Amnay River, Sablayan, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217120406.7,"abc":217125000.0,"fy":"2023","sd":"02/11/2023","cd":"2024-03-25","lat":12.9585,"lon":120.7926,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Claudio Salgado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1942},{"i":2549,"cid":"22CC0206","pid":"P00621532LZ","t":"Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":24498166.71,"abc":24499898.64,"fy":"2022","sd":"04/04/2022","cd":"2022-11-22","lat":14.837285,"lon":120.923555,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.83724,120.9237],"wst":"matched","br":"Dalig","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1943},{"i":2550,"cid":"23PI0001","pid":"P00726413LZ","t":"Construction of Monamon Sur and Monamon Norte Flood Control, Bebe-Saew Section, Sta. 70 + 440 - Sta. 71 + 540 (RS) along Chico River, Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BAUKO (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"OLSIM CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":86850000.0,"abc":86849999.4,"fy":"2023","sd":"05/24/2023","cd":"2023-11-28","lat":16.86,"lon":120.891667,"sm":189,"fm":189,"tm":189,"am":189,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.01,"wp":[16.85998,120.89161],"wst":"matched","br":null,"len":1100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":413},{"i":2551,"cid":"24CC0358","pid":"P00844743LZ","t":"Construction of Revetment at Barangay San Jose, Paombong, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOUGHBILT CONSTRUCTION & TRADING, INC.","c":26533190.34,"abc":27633051.33,"fy":"2024","sd":"04/18/2024","cd":"2024-08-16","lat":14.821945,"lon":120.79275,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1944},{"i":2552,"cid":"23DC0059","pid":"P00725803LZ","t":"Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":67549500.0,"abc":67550000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-12-12","lat":14.046955,"lon":120.931598,"sm":762,"fm":762,"tm":762,"am":762,"md":0.0,"ls":"inside","ww":"Bugaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1945},{"i":2553,"cid":"24CC0036","pid":"P00838406LZ","t":"Construction of Riverbank Protection Structure at Barangay Pagala, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":72374181.8,"abc":72374960.15,"fy":"2024","sd":"02/07/2024","cd":"2024-09-18","lat":14.965373,"lon":120.891784,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2301,2324,2331,2585,2635],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1016},{"i":2554,"cid":"24CC0296","pid":"P00845793LZ","t":"Construction of Slope Protection Structure and Waterways, Barangay Malibong Bata, Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98998994.07,"abc":98999815.9,"fy":"2024","sd":"04/23/2024","cd":"2025-01-08","lat":14.844215,"lon":120.923562,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malibong Bata","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1946},{"i":2555,"cid":"22OA0055","pid":"P00631014LZ","t":"Construction of Bonifacio Pumping Station, Brgy. Flores, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":19598678.11,"abc":19599988.16,"fy":"2022","sd":"02/15/2022","cd":"2022-09-12","lat":14.672491,"lon":120.942334,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Flores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1947},{"i":2556,"cid":"22AI0106","pid":"P00620973LZ","t":"Construction of Flood Control Structure along Cabulandayan River, Brgy. San Eugenio, Natividad, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"NATIVIDAD (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT","c":29390746.66,"abc":29400000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-30","lat":16.06689,"lon":120.7928,"sm":1015,"fm":1015,"tm":1015,"am":1341,"md":0.13,"ls":"boundary","ww":"Cabulandayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Eugenio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1948},{"i":2557,"cid":"23CC0091","pid":"P00726480LZ","t":"Construction of River Control Project along Balagtas River, Panginay, Sta. 16+310 - Sta. 16+515, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499347.85,"abc":96499429.13,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":14.804979,"lon":120.899756,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.80502,120.90008],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[2503,2484,2512,2493,2507],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23CC0088 to 23CC0093) cover the same site, together worth PHP 578,993,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":268},{"i":2558,"cid":"24CD0101","pid":"P00825065LZ","t":"Construction of Flood Control Structure along Meycauyan River, Sta 04+900 - Sta 05+100 (Liputan-Constantino Section, Right side), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499747.83,"abc":96499598.17,"fy":"2024","sd":"03/18/2024","cd":"2024-12-06","lat":14.738954,"lon":120.931655,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauyan","wn":"Meycauayan River","wd":0.49,"wp":[14.73496,120.92962],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2438,2404],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0099 to 24CD0101) cover the same site, together worth PHP 289,422,460.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":269},{"i":2559,"cid":"24PE0024","pid":"P00821531LZ","t":"Construction of Flood Mitigation Structure along Agno River, Section 31a (Lower Sapnaguey), Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":39193427.02,"abc":39200000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-10-08","lat":16.65689,"lon":120.82613,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.65,"wp":[16.65191,120.82285],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1949},{"i":2560,"cid":"23CC0151","pid":"P00725684LZ","t":"Construction of Revetment Wall at Barangay Tangos, Sta. 01+120 to Sta. 01+520, Baliuag, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":96499915.59,"abc":96499834.19,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":14.973529,"lon":120.891948,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1950},{"i":2561,"cid":"24CC0370","pid":"P00825078LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, San Pedro Section, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":77199087.48,"abc":77199992.37,"fy":"2024","sd":"04/23/2024","cd":"2024-08-02","lat":14.942379,"lon":120.90005,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.94282,120.89962],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1951},{"i":2562,"cid":"24CC0144","pid":"P00825102LZ","t":"Construction of Flood Control Structure along Angat River, Sipat Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499992.1,"abc":96499940.15,"fy":"2024","sd":"03/20/2024","cd":"2024-06-11","lat":14.903603,"lon":120.826385,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.90389,120.82675],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1952},{"i":2563,"cid":"22OA0038","pid":"P00621132LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 20), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":57900000.0,"abc":58789577.78,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.70102,"lon":120.923643,"sm":399,"fm":399,"tm":399,"am":409,"md":0.14,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.02,"wp":[14.70122,120.92363],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 20","dup":[],"run":[2722,2658,2361],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2573,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":59,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OA0038 to 22OA0042) cover the same site, together worth PHP 214,290,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":28},{"i":2564,"cid":"22AA0152","pid":"P00637764LZ","t":"Construction of Flood Mitigation Structure along Vintar River (Bislak River), Brgy. Canaam, Sitio Canadem, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ASIAN PEARL CONSTRUCTION & DEVT. CORP.","c":48360631.63,"abc":49499628.27,"fy":"2022","sd":"04/04/2022","cd":"2022-10-21","lat":18.302223,"lon":120.793102,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Vintar","wn":"Vintar River","wd":7.62,"wp":[18.33048,120.72738],"wst":"matched","br":"Canaam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.62,"text":"The title names Vintar, which OpenStreetMap maps through the stated municipality, but the pin is 7.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":320},{"i":2565,"cid":"24DF0156","pid":"P00845829LZ","t":"Construction of Revetment along Julian River, Brgy. Kalsadang Bago, Imus City, Cavite (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"MOTIONTRADE DEVELOPMENT CORPORATION / OMNICON BUILDERS","c":99000000.0,"abc":99000000.0,"fy":"2024","sd":"03/20/2024","cd":"2024-12-21","lat":14.421517,"lon":120.931686,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.42155,120.9318],"wst":"matched","br":"Kalsadang Bago","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1953},{"i":2566,"cid":"23E00025","pid":"P00736038LZ","t":"Construction of Road Dike/Esplanade along Patrick River, Barangay Victoria Section, Sablayan, Occidental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217123478.2,"abc":217124999.5,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.9263,"lon":120.827,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.14,"wp":[12.9251,120.82653],"wst":"matched","br":"Victoria Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1954},{"i":2567,"cid":"24CE0164","pid":"P00823449LZ","t":"Construction of Flood Control Structure along Baliwag River, Barangay Mapangpang, Lupao, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LUPAO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC. / P.S. AQUINO CONSTRUCTION","c":47767657.74,"abc":48250000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-28","lat":15.802224,"lon":120.891996,"sm":831,"fm":831,"tm":831,"am":831,"md":0.0,"ls":"inside","ww":"Baliwag","wn":"Baliwag River","wd":0.52,"wp":[15.79762,120.89096],"wst":"matched","br":"Mapangpang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1955},{"i":2568,"cid":"21CD0130","pid":"P00526013LZ","t":"Construction of Flood Control Structures, Anyatam, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"San Ildefonso","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":36389489.38,"abc":36397195.7,"fy":"2021","sd":"03/30/2022","cd":"2022-08-30","lat":15.105853,"lon":120.942615,"sm":1284,"fm":null,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1956},{"i":2569,"cid":"23DF0065","pid":"P00742419LZ","t":"Construction of Revetment along Taguilid River , Kawit Section, Kawit, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":41125223.87,"abc":41580000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-12-19","lat":14.44662,"lon":120.900094,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":"Taguilid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1957},{"i":2570,"cid":"22DF0032","pid":"P00620228LZ","t":"Construction of Revetment along Julian River, Brgy. Malagasang II-A, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"MONTADEL ENTERPRISES","c":90710000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-21","lat":14.37626,"lon":120.9317,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.37627,120.93182],"wst":"matched","br":"Malagasang II-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1958},{"i":2571,"cid":"23CC0202","pid":"P00742318LZ","t":"Construction of Revetment (Concrete Slope) at Sitio Pulo, San Roque, Paombong, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"PAOMBONG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":14847428.18,"abc":14849762.77,"fy":"2023","sd":"03/27/2023","cd":"2023-11-21","lat":14.82124,"lon":120.793277,"sm":1100,"fm":1100,"tm":1100,"am":1100,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1959},{"i":2572,"cid":"23CC0053","pid":"P00726717LZ","t":"Construction of River Control Project along Angat River, Bintog Tributary Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48999034.31,"abc":48999386.12,"fy":"2023","sd":"02/06/2023","cd":"2023-05-19","lat":14.906634,"lon":120.892072,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.12,"wp":[14.90751,120.89141],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2601,2079,2885],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CC0052 to 23CC0055) cover the same site, together worth PHP 150,182,208.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":515},{"i":2573,"cid":"22OA0009","pid":"P00620350LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 15), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"B. BERNARDO CONST., INC.","c":49000000.0,"abc":48952560.92,"fy":"2022","sd":"02/14/2022","cd":"2022-11-16","lat":14.697174,"lon":120.923647,"sm":399,"fm":399,"tm":399,"am":409,"md":0.13,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.02,"wp":[14.69709,120.92345],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 15","dup":[],"run":[2677,2725,2662,2597,2490,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2597,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":52},{"i":2574,"cid":"24CC0161","pid":"P00823425LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Bocaue River, Barangay Turo, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":78161014.06,"abc":78164396.48,"fy":"2024","sd":"02/28/2024","cd":"2024-11-23","lat":14.813341,"lon":120.942676,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Turo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1960},{"i":2575,"cid":"23EB0022","pid":"P00726261LZ","t":"Construction of Flood Control Structure along Patrick River, Barangay Tagumpay Section, Sta. 0+000 - Sta. 0+440, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":45079105.81,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-09-12","lat":12.92424,"lon":120.82716,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.06,"wp":[12.92476,120.82738],"wst":"matched","br":"Tagumpay Section","len":440.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1961},{"i":2576,"cid":"22DF0030","pid":"P00620227LZ","t":"Construction of Revetment along Julian River, Brgy. Malagasang I-F, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":90710000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-21","lat":14.37967,"lon":120.9318,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.3797,120.93187],"wst":"matched","br":"Malagasang I-F","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1962},{"i":2577,"cid":"24CC0003","pid":"P00838375LZ","t":"Construction of Riverbank Protection Structure along Balagtas River (Phase II), Barangay San Juan, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96499691.57,"abc":96499911.14,"fy":"2024","sd":"02/07/2024","cd":"2024-09-18","lat":14.813667,"lon":120.900168,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.81397,120.90017],"wst":"matched","br":"San Juan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1963},{"i":2578,"cid":"24CE0118","pid":"P00823427LZ","t":"Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Sta. Monica, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":47897330.68,"abc":48381240.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-27","lat":15.496049,"lon":120.793461,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.03,"wp":[15.49634,120.79337],"wst":"matched","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1964},{"i":2579,"cid":"22DF0033","pid":"P00620251LZ","t":"Construction of Road Dike along Julian River, Brgy. Malagasang II-A, East Side, Imus, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":90710000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-21","lat":14.37625,"lon":120.9318,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.0,"wp":[14.37625,120.93183],"wst":"matched","br":"Malagasang II-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1965},{"i":2580,"cid":"23CF0044","pid":"P00727297LZ","t":"Rehabilitation of Flood Control Structure along Pampanga River, Brgy. Santa Isabel, Cabiao, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABIAO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"D.B. BARAQUIEL CONSTRUCTION / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":65342020.1,"abc":64770773.75,"fy":"2023","sd":"03/29/2023","cd":"2023-12-05","lat":15.2321,"lon":120.8272,"sm":278,"fm":278,"tm":278,"am":278,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.11,"wp":[15.23186,120.82818],"wst":"matched","br":"Santa Isabel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.39,"value":1.00882,"text":"Contract cost is 0.88% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":748},{"i":2581,"cid":"23CE0102","pid":"P00742338LZ","t":"Construction of Drainage Structure, Sitio Paraiso, Barangay San Antonio Este, Lupao, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LUPAO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":4850999.14,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-05-15","lat":15.854724,"lon":120.90022,"sm":831,"fm":831,"tm":831,"am":831,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio Este","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1966},{"i":2582,"cid":"22DQ0105","pid":"P00644779LZ","t":"Repair/Rehabilitation of Imus River Revetment, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":11097413.02,"abc":11097468.73,"fy":"2022","sd":"02/01/2023","cd":"2023-05-10","lat":14.44227,"lon":120.931828,"sm":98,"fm":98,"tm":360,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.03,"wp":[14.44208,120.93199],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.34,"text":"The record contradicts itself: the municipality field and the pin point to Bacoor City, Cavite, but the title names Cavite City, Cavite, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":604},{"i":2583,"cid":"22CC0278","pid":"P00639475LZ","t":"Rehabilitation of Balagtas River Control Structure, Sta. 02+272 to Sta. 02+664, Brgy. Dalig, Balagtas, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48999277.98,"abc":48999297.93,"fy":"2022","sd":"04/05/2022","cd":"2023-01-27","lat":14.835301,"lon":120.9237,"sm":117,"fm":597,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.83536,120.92374],"wst":"matched","br":"Dalig","len":392.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1967},{"i":2584,"cid":"24CG0036","pid":"P00820831LZ","t":"Construction of AMRIS Bambang Creek Slope Protection Structure, San Simon, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN SIMON (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"JMSKI CONSTRUCTION AND TRADING","c":27841800.0,"abc":29400000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-08-29","lat":14.993436,"lon":120.793853,"sm":1359,"fm":1359,"tm":1359,"am":1359,"md":0.0,"ls":"inside","ww":"AMRIS Bambang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1968},{"i":2585,"cid":"24CC0171","pid":"P00843307LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay Pagala (Purok 3 to Purok 4), Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":77199166.63,"abc":77199928.71,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.9649,"lon":120.892084,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":null,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2301,2324,2331,2553,2635],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1017},{"i":2586,"cid":"24CF0021","pid":"P00825091LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay San Vicente, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":144749663.0,"abc":144749991.2,"fy":"2024","sd":"02/12/2024","cd":"2024-05-27","lat":15.3128,"lon":120.9428,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.06,"wp":[15.31316,120.94236],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[2588],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 215,676,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":676},{"i":2587,"cid":"23CC0215","pid":"P00742137LZ","t":"Construction of River Protection Structure including Rehabilitation of Waterways at Brgy. Bagbaguin, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":74249006.72,"abc":74249461.32,"fy":"2023","sd":"03/28/2023","cd":"2023-11-07","lat":14.878677,"lon":120.923737,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbaguin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1969},{"i":2588,"cid":"24CF0092","pid":"P00848621LZ","t":"Construction of Flood Control Structure including Road Dike along Peñaranda River, Barangays San Vicente-San Lorenzo, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":70927178.54,"abc":72375034.8,"fy":"2024","sd":"05/14/2024","cd":"2024-10-09","lat":15.3128,"lon":120.9428,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.06,"wp":[15.31316,120.94236],"wst":"matched","br":"San Vicente-San Lorenzo","len":null,"ph":null,"dup":[2586],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 215,676,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":835},{"i":2589,"cid":"22CE0106","pid":"P00620534LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Sta. Monica, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":45073229.89,"abc":45080000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-08-22","lat":15.4966,"lon":120.79438,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.49673,120.79431],"wst":"matched","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1970},{"i":2590,"cid":"23CC0321","pid":"P00727358LZ","t":"Construction of River Protection along Angat River, K011 + 810 to K011 + 960, Culianin, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"CEDAR CONSTRUCTION","c":48999608.65,"abc":48999982.17,"fy":"2023","sd":"03/07/2023","cd":"2023-09-11","lat":14.907347,"lon":120.892303,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.90785,120.89195],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1971},{"i":2591,"cid":"24DE0068","pid":"P00823543LZ","t":"Construction of Flood Control Structure at Sitio Mainit Proper, Mainit, Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":9650000.0,"abc":9650000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-05-15","lat":13.691154,"lon":120.900225,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1972},{"i":2592,"cid":"22E00071","pid":"P00621106LZ","t":"Construction of Flood Control Structure, Amnay River, Claudio Salgado Section, Sta. 0+000 - Sta. 0+307, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":48249983.48,"abc":226774789.4,"fy":"2022","sd":"07/06/2022","cd":"2023-07-03","lat":12.947868,"lon":120.827446,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.71,"wp":[12.95427,120.82735],"wst":"matched","br":null,"len":307.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1973},{"i":2593,"cid":"23AA0062","pid":"P00737411LZ","t":"Construction of Slope Protection along Abang Bridge (Downstream Side Left Bank), Barangay Lanao, Bangui, Ilocos Norte","w":"Construction of Slope Protection Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"TMT CONSTRUCTION","c":14849740.15,"abc":14849740.45,"fy":"2023","sd":"02/13/2023","cd":"2023-04-18","lat":18.531151,"lon":120.794431,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lanao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1974},{"i":2594,"cid":"23OA0040","pid":"P00726994LZ","t":"Construction of B. Cruz Pumping Staiton, Brgy. Tangos North, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":23267355.14,"abc":23268464.45,"fy":"2023","sd":"03/08/2023","cd":"2023-11-02","lat":14.675592,"lon":120.931846,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1975},{"i":2595,"cid":"22C00075","pid":"P00640455LZ","t":"Construction of Flood Control Structure Along Ciudad De Victoria Tributaries leading to Bocaue River (Igulot Section) Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":148498575.1,"abc":148498661.7,"fy":"2022","sd":"07/11/2022","cd":"2023-05-06","lat":14.8,"lon":120.943117,"sm":216,"fm":216,"tm":248,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.38,"text":"The record contradicts itself: the municipality field and the pin point to Bocaue, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":171},{"i":2596,"cid":"24DF0079","pid":"P00846049LZ","t":"Construction of Grouted Riprap at Barangay Hugo Perez (Phase 2), Trece Martires, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":6877933.95,"abc":6930000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-18","lat":14.287706,"lon":120.892572,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hugo Perez","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1976},{"i":2597,"cid":"22OA0008","pid":"P00620349LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 14), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AZUL BUILDERS","c":49000000.0,"abc":48918768.51,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.696236,"lon":120.923843,"sm":399,"fm":399,"tm":399,"am":409,"md":0.18,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.0,"wp":[14.69623,120.92382],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 14","dup":[],"run":[2677,2725,2662,2573,2490,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2658,2662,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":53},{"i":2598,"cid":"23DF0024","pid":"P00726212LZ","t":"Construction of Revetment along Julian River, Barangay Bayan Luma IX, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-06-26","lat":14.406431,"lon":120.931911,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.0,"wp":[14.40645,120.93195],"wst":"matched","br":"Bayan Luma IX","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1977},{"i":2599,"cid":"24CC0182","pid":"P00845977LZ","t":"Construction of Concrete Slope River Wall along Balagtas River, Barangay Panginay (Tributary), Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":49499483.0,"abc":49499863.67,"fy":"2024","sd":"02/28/2024","cd":"2024-05-22","lat":14.81913,"lon":120.900885,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.57,"wp":[14.81397,120.90086],"wst":"matched","br":"Panginay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1978},{"i":2600,"cid":"22E00071","pid":"P00621107LZ","t":"Construction of Flood Control Structure, Amnay River, Sta. 0+320 - Sta. 0+603, Claudio Salgado Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ANORE CONSTRUCTION","c":43424883.41,"abc":226774789.4,"fy":"2022","sd":"07/06/2022","cd":"2023-07-03","lat":12.947868,"lon":120.827446,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.71,"wp":[12.95427,120.82735],"wst":"matched","br":null,"len":283.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1979},{"i":2601,"cid":"23CC0052","pid":"P00726151LZ","t":"Construction of Flood Control Structure San Jose-Bintog Tributaries of Angat River, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":48998832.05,"abc":48999386.12,"fy":"2023","sd":"02/06/2023","cd":"2023-12-02","lat":14.906938,"lon":120.892609,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.12,"wp":[14.90785,120.89195],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2572,2079,2885],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CC0052 to 23CC0055) cover the same site, together worth PHP 150,182,208.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":516},{"i":2602,"cid":"22CC0148","pid":"P00630512LZ","t":"Construction of Bulihan-Longos Creek, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FRAMECON BUILDERS","c":48998604.86,"abc":48999404.39,"fy":"2022","sd":"02/18/2022","cd":"2023-02-12","lat":14.878831,"lon":120.794481,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Bulihan-Longos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1980},{"i":2603,"cid":"24OA0043","pid":"P00839458LZ","t":"Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 6), Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":59397439.53,"abc":59389785.02,"fy":"2024","sd":"02/21/2024","cd":"2024-11-12","lat":14.681394,"lon":120.943241,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Dampalit","wn":"Dampalit River","wd":0.02,"wp":[14.68147,120.94337],"wst":"matched","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[2495,2740],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0042 to 24OA0044) cover the same site, together worth PHP 188,096,203.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":422},{"i":2604,"cid":"23D00097","pid":"P00725783LZ","t":"Construction of Revetment along Cañas River, General Trias, Cavite, Phase 1","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":99604433.44,"abc":99608747.5,"fy":"2023","sd":"03/24/2023","cd":"2024-02-19","lat":14.319822,"lon":120.892622,"sm":387,"fm":387,"tm":360,"am":387,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":1.85,"wp":[14.30313,120.89336],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":14.89,"text":"The record contradicts itself: the municipality field and the pin point to City of General Trias, Cavite, but the title names Cavite City, Cavite, 15 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":429},{"i":2605,"cid":"23AI0084","pid":"P00727334LZ","t":"Construction of Flood Control Structure along Viray River, Brgy. Batchelor East, Natividad, Pangasinan","w":"Construction of Dike","rg":"Region I","pv":"PANGASINAN","mu":"ROSALES (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS)","c":33604549.09,"abc":34300000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-15","lat":16.055385,"lon":120.827986,"sm":1015,"fm":1215,"tm":1015,"am":1015,"md":0.0,"ls":"inside","ww":"Viray","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batchelor East","len":null,"ph":null,"dup":[2622],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":22.5,"text":"The record contradicts itself: the title and the pin point to Natividad, Pangasinan, but the municipality field names Rosales, Pangasinan, 22 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 53,359,075.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":113},{"i":2606,"cid":"24CC0078","pid":"P00821267LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Cambaog, Bustos, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":96499726.23,"abc":96499995.73,"fy":"2024","sd":"02/07/2024","cd":"2024-09-16","lat":14.930821,"lon":120.892674,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.02,"wp":[14.93095,120.89259],"wst":"matched","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1981},{"i":2607,"cid":"24CE0127","pid":"P00820285LZ","t":"Rehabilitation of Quezon Riverbank Slope Protection Structure along Labong River (Package 1), Barangay Santa Clara, Quezon, Nueva Ecija","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"QUEZON (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":47766812.33,"abc":48250000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-06-18","lat":15.583947,"lon":120.794837,"sm":1187,"fm":1187,"tm":1187,"am":1187,"md":0.0,"ls":"inside","ww":"Quezon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Santa Clara","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1982},{"i":2608,"cid":"23P00034","pid":"P00727097LZ","t":"Construction of Flood Control along Tinoc River, Sta. 21 + 310 -  Sta. 21 + 385, Sta. 22 + 000 - Sta. 22 + 070, Sta. 22 +\n700 - Sta. 22 + 750, Sta. 22 + 900 - Sta. 22 + 950, Sta.\n23 + 050 - Sta. 23 + 150, (Ahin Section), Tinoc, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"TINOC (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION / BEGAL DESIGN & CONSTRUCTION","c":29731650.0,"abc":30192773.8,"fy":"2023","sd":"07/03/2023","cd":"2024-02-01","lat":16.76525,"lon":120.94382,"sm":1571,"fm":1571,"tm":1571,"am":1571,"md":0.0,"ls":"inside","ww":"Tinoc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":345.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1983},{"i":2609,"cid":"24CD0049","pid":"P00820233LZ","t":"Construction of Flood Control Structure, Sta. 00+208 - Sta. 00+312 (Tawiran-Paliwas Section), Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":144749905.8,"abc":144749118.6,"fy":"2024","sd":"02/22/2024","cd":"2025-01-06","lat":14.716653,"lon":120.931924,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":104.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"cost_per_metre_outlier","group":"risk","strength":0.5,"value":1391826,"text":"About PHP 1,391,826 per metre over 104 m, versus a median of PHP 139,997 for flood mitigation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":324},{"i":2610,"cid":"23CC0083","pid":"P00726459LZ","t":"Construction of River Control Project along Angat River, Tiaong Section. Sta. 08+370 to Sta. 08+700, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96498901.91,"abc":96499205.41,"fy":"2023","sd":"02/13/2023","cd":"2024-02-07","lat":14.945077,"lon":120.900901,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.13,"wp":[14.94503,120.90214],"wst":"matched","br":null,"len":330.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1984},{"i":2611,"cid":"24CE0123","pid":"P00823474LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Sicsican Matanda, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":47771977.22,"abc":48250000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-08-30","lat":15.629239,"lon":120.923958,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.6291,120.92408],"wst":"matched","br":"Sicsican Matanda","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1985},{"i":2612,"cid":"22OD0042","pid":"P00620082LZ","t":"Improvement of Flood Control River Wall along Polo River, Barangay Tagalag, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":89830037.3,"abc":91655961.31,"fy":"2022","sd":"02/11/2022","cd":"2023-02-10","lat":14.731566,"lon":120.931937,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Polo","wn":"Polo River","wd":0.04,"wp":[14.73142,120.93161],"wst":"matched","br":"Tagalag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1986},{"i":2613,"cid":"22CC0092","pid":"P00620516LZ","t":"Construction of Flood Control Structure, Malibong Bata Section, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":43201412.48,"abc":43209570.77,"fy":"2022","sd":"01/28/2022","cd":"2022-08-25","lat":14.838401,"lon":120.923965,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1987},{"i":2614,"cid":"24CC0421","pid":"P00825077LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, San Jose Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199523.04,"abc":77199162.86,"fy":"2024","sd":"05/14/2024","cd":"2024-09-26","lat":14.908344,"lon":120.893027,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90856,120.8927],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2368,2844],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0421 to 24CC0423) cover the same site, together worth PHP 250,899,023.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":398},{"i":2615,"cid":"24OA0019","pid":"P00820551LZ","t":"Construction of Pumping Station, Daanghari Creek, Barangay Daanghari, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"P7 BUILDERS INC.","c":29400000.0,"abc":29395794.54,"fy":"2024","sd":"02/12/2024","cd":"2024-08-09","lat":14.669676,"lon":120.943839,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Daanghari","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Daanghari","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1988},{"i":2616,"cid":"23A00266","pid":"P00726829LZ","t":"Construction of Revetment along Bolo River, Barangay Poblacion, Adams, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"ADAMS (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"J.C. PINON CONSTRUCTION INC.(FORMERLY J.C. PINON CONST) / WAWAO BUILDERS","c":96499992.55,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-06-30","lat":18.46927,"lon":120.901049,"sm":5,"fm":5,"tm":5,"am":5,"md":0.0,"ls":"inside","ww":"Bolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1989},{"i":2617,"cid":"24DE0018","pid":"P00839600LZ","t":"Construction of Seawall, Barangay Gasang, Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-03-19","lat":13.716034,"lon":120.92398,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gasang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1990},{"i":2618,"cid":"23CC0056","pid":"P00726150LZ","t":"Construction of Slope Protection (Revetment), Barangay Cambaog, Bustos, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":22784390.77,"abc":22784483.17,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.932071,"lon":120.893097,"sm":265,"fm":265,"tm":265,"am":136,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1991},{"i":2619,"cid":"22DF0031","pid":"P00620250LZ","t":"Construction of Road Dike along Julian River, Brgy. Malagasang I-F, East Side, Imus, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"HAUSLAND CONSTRUCTION","c":90710000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-01-20","lat":14.37972,"lon":120.932,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.37967,120.93189],"wst":"matched","br":"Malagasang I-F","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1992},{"i":2620,"cid":"22DG0047","pid":"P00631290LZ","t":"Construction of Flood Control Structure at Barangay Halang, Naic, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NAIC (CAVITE)","deo":"Cavite 2nd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":33105536.48,"abc":34299948.53,"fy":"2022","sd":"02/14/2022","cd":"2023-08-03","lat":14.291522,"lon":120.79501,"sm":1009,"fm":1009,"tm":1009,"am":1009,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Halang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1993},{"i":2621,"cid":"24CD0005","pid":"P00820207LZ","t":"Construction of Flood Control Structure along Meycauayan River, Sta. 01+800 - Sta. 01+950 (Liputan - Ubihan Section), Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE","c":67549893.33,"abc":67549368.56,"fy":"2024","sd":"02/14/2024","cd":"2024-12-12","lat":14.738824,"lon":120.92424,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.11,"wp":[14.73797,120.92381],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[2525,2316,2328,2371],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0001 to 24CD0005) cover the same site, together worth PHP 337,734,367.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":423},{"i":2622,"cid":"23AI0104","pid":"P00742283LZ","t":"Construction of Flood Mitigation Structures along Viray River, Tayug, Pangasinan (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"PANGASINAN","mu":"TAYUG (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED","c":19754526.15,"abc":19600000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-05-31","lat":16.055385,"lon":120.827986,"sm":1558,"fm":1558,"tm":1558,"am":1015,"md":6.35,"ls":"outside","ww":"Viray","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[2605],"run":[],"cl":[],"L":"records","s":65,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.35,"text":"The pin is 6.3 km outside Tayug, Pangasinan, the nearest municipality the record claims. It falls in Natividad, Pangasinan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 53,359,075.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"above_budget_ceiling","group":"risk","strength":0.39,"value":1.00788,"text":"Contract cost is 0.79% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":64},{"i":2623,"cid":"23CC0128","pid":"P00726486LZ","t":"Construction of River Control Project along Balagtas River, Barangay Malibong Bata, Sta. 02+250 to Sta. 02+600, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96317780.07,"abc":96499971.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-11","lat":14.831545,"lon":120.92437,"sm":1084,"fm":1084,"tm":1084,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.83159,120.92435],"wst":"matched","br":"Malibong Bata","len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1994},{"i":2624,"cid":"23DF0066","pid":"P00727313LZ","t":"Construction of Revetment at Panamintan River, Brgy. Batong Dalig Kawit, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":67549748.33,"abc":67550000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-29","lat":14.437656,"lon":120.893133,"sm":705,"fm":705,"tm":360,"am":705,"md":0.0,"ls":"inside","ww":"Panamintan","wn":"Panamitan River","wd":0.18,"wp":[14.43836,120.89461],"wst":"matched","br":"Batong Dalig Kawit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1995},{"i":2625,"cid":"23CE0037","pid":"P00725705LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. Lapurisima to Brgy. Pantoc, Aliaga, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96495000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-08-01","lat":15.524048,"lon":120.82814,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.15,"wp":[15.52541,120.82798],"wst":"matched","br":"Lapurisima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1996},{"i":2626,"cid":"23CC0044","pid":"P00726720LZ","t":"Construction of River Control Project along Angat River, San Jose Section, Sta. 07+950 to Sta. 08+080, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":39197381.73,"abc":39199454.62,"fy":"2023","sd":"02/06/2023","cd":"2023-05-09","lat":14.945866,"lon":120.901268,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.11,"wp":[14.94556,120.9022],"wst":"matched","br":null,"len":130.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1997},{"i":2627,"cid":"24CC0031","pid":"P00839479LZ","t":"Construction of Riverbank Protection Structure at Barangay Wawa (Tributary), Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":98999609.48,"abc":98999943.2,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.818563,"lon":120.901516,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1998},{"i":2628,"cid":"24OA0011","pid":"P00820557LZ","t":"Rehabilitation of Drainage System, Navotas Elementary School, Navotas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":4899444.87,"abc":4896005.68,"fy":"2024","sd":"02/12/2024","cd":"2024-06-10","lat":14.662269,"lon":120.944019,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":1999},{"i":2629,"cid":"24PF0034","pid":"P00821533LZ","t":"Construction of Flood Mitigation Structure along Agno River, Salingao Section, Sta. 0+022 - Sta. 0+306 (B.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"GELLE CONSTRUCTION SERVICES","c":19550030.78,"abc":19600000.0,"fy":"2024","sd":"07/01/2024","cd":"2024-11-20","lat":16.793953,"lon":120.82816,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.15,"wp":[16.79313,120.82926],"wst":"matched","br":null,"len":284.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2000},{"i":2630,"cid":"22CC0257","pid":"P00639468LZ","t":"Construction of Flood Control Structure and Improvement of Waterways at Brgy. Piel, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999769.37,"abc":48999726.61,"fy":"2022","sd":"04/05/2022","cd":"2023-01-28","lat":14.961378,"lon":120.893736,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2856,2860,2861,2874,2881,2890,2893],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":987},{"i":2631,"cid":"23CC0139","pid":"P00737456LZ","t":"Construction of Revetment along Balagtas River, Malibong Bata Section, Malibong Bata, Pandi, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":19798628.36,"abc":19799993.71,"fy":"2023","sd":"02/06/2023","cd":"2023-08-10","lat":14.83156,"lon":120.92437,"sm":1084,"fm":1084,"tm":1084,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.83159,120.92435],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2001},{"i":2632,"cid":"22CC0277","pid":"P00640520LZ","t":"Construction of Manila North Road Drainage Tributary Outfall, Longos- Calumpit Section, Malolos City, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":47518704.12,"abc":47519522.48,"fy":"2022","sd":"04/05/2022","cd":"2023-01-29","lat":14.875988,"lon":120.795161,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Manila North Road Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2002},{"i":2633,"cid":"24CC0401","pid":"P00845816LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Turo (Sitio Hangga), Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98994958.26,"abc":98999654.86,"fy":"2024","sd":"04/23/2024","cd":"2025-01-17","lat":14.812368,"lon":120.94415,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Turo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2003},{"i":2634,"cid":"23DF0025","pid":"P00726211LZ","t":"Construction of Road Dike along Julian River, Barangay Bayan Luma IX, East Side, Imus, Cavite","w":"Construction of Dike","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":48475958.6,"abc":49000000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-09-01","lat":14.406464,"lon":120.932053,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.40642,120.93197],"wst":"matched","br":"Bayan Luma IX","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2004},{"i":2635,"cid":"23CC0267","pid":"P00726902LZ","t":"Construction of Flood Control System at Barangay Pagala, Baliuag, Bulacan (Sta. 02+900 to Sta. 03+160)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77188797.98,"abc":77199405.85,"fy":"2023","sd":"03/14/2023","cd":"2023-10-02","lat":14.961432,"lon":120.893744,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pagala","len":260.0,"ph":null,"dup":[],"run":[],"cl":[2222,2247,2275,2301,2324,2331,2553,2585],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Pagala (2023 to 2024), totalling PHP 675,025,063.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1018},{"i":2636,"cid":"23CG0159","pid":"P00742341LZ","t":"Rehabilitation of Eroded Pampanga River Bank along Sta. Catalina, San Luis, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN LUIS (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"CEDAR CONSTRUCTION","c":14478626.94,"abc":14850000.0,"fy":"2023","sd":"05/16/2023","cd":"2023-09-27","lat":15.054741,"lon":120.795931,"sm":1319,"fm":1319,"tm":1319,"am":1319,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2005},{"i":2637,"cid":"23DF0035","pid":"P00742421LZ","t":"Construction of Drainage System in Barangay Poblacion, Kawit, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"T.E. TRINIDAD CONSTRUCTION","c":6855432.89,"abc":6930000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-07-26","lat":14.444497,"lon":120.9017,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2006},{"i":2638,"cid":"24CD0061","pid":"P00821232LZ","t":"Construction of Flood Control Structure along Marilao River and Its Tributaries - Tabon Creek, Sta. 04+525 - Sta. 04+925, Barangay Nagbalon, Marilao, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":106149931.6,"abc":106149886.5,"fy":"2024","sd":"02/14/2024","cd":"2024-10-05","lat":14.748613,"lon":120.944236,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":"Marilao","wn":"Marilao River","wd":0.57,"wp":[14.74532,120.94825],"wst":"matched","br":"Nagbalon","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2007},{"i":2639,"cid":"22CC0268","pid":"P00621530LZ","t":"Construction of Flood Control Structures along Angat River Sta. 00+760 to Sta. 00+960 Sipat Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":23521006.99,"abc":24499991.38,"fy":"2022","sd":"04/04/2022","cd":"2022-10-30","lat":14.900402,"lon":120.828343,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.9008,120.8288],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[2041,2375],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0266 to 22CC0269) cover the same site, together worth PHP 96,119,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":647},{"i":2640,"cid":"22AA0130","pid":"P00621442LZ","t":"Construction of Flood Control Structures along Bislak River, Brgy. Canaam, 0+000-0+812, Vintar, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"VINTAR (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"ASIAN PEARL CONSTRUCTION & DEVT. CORP.","c":48343757.01,"abc":48999549.26,"fy":"2022","sd":"04/04/2022","cd":"2023-02-18","lat":18.312361,"lon":120.795976,"sm":1638,"fm":1638,"tm":1638,"am":1638,"md":0.0,"ls":"inside","ww":"Bislak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Canaam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2008},{"i":2641,"cid":"22CC0138","pid":"P00631215LZ","t":"Rehabilitation of River Control Structures along Angat River, Tanawan, Bustos, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079027.76,"abc":45079476.32,"fy":"2022","sd":"03/04/2022","cd":"2022-07-15","lat":14.961111,"lon":120.924444,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.27,"wp":[14.96233,120.92222],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2898,2765],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0136 to 22CC0138) cover the same site, together worth PHP 152,868,005.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":579},{"i":2642,"cid":"23CC0060","pid":"P00736012LZ","t":"Construction of Concrete Slope Protection at Barangay Tangos, K002 + 360 - K002 + 960, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":28948920.97,"abc":28949533.47,"fy":"2023","sd":"02/13/2023","cd":"2023-09-10","lat":14.970769,"lon":120.893952,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2009},{"i":2643,"cid":"23AA0134","pid":"P00725631LZ","t":"Construction of Flood Control Structure along Pasaleng River, Sitio Nagpanga, Brgy. Pasaleng, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":62724999.57,"abc":63699729.25,"fy":"2023","sd":"03/13/2023","cd":"2023-08-29","lat":18.553321,"lon":120.932205,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Pasaleng","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pasaleng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2010},{"i":2644,"cid":"22CC0123","pid":"P00632810LZ","t":"Construction of Drainage Canal along Barangays Concepcion, Santo Cristo, Virgen Delas Flores and San Jose, Baliuag, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":29699999.52,"abc":29699837.86,"fy":"2022","sd":"01/28/2022","cd":"2022-10-14","lat":14.950777,"lon":120.893963,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2011},{"i":2645,"cid":"24CC0183","pid":"P00845972LZ","t":"Construction of Flood Control Structure along Balagtas River, Barangay San Juan, Purok 4-Purok 5, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":49499511.04,"abc":49499919.36,"fy":"2024","sd":"02/28/2024","cd":"2024-08-05","lat":14.8137,"lon":120.901967,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.81396,120.90197],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2012},{"i":2646,"cid":"24PE0039","pid":"P00820735LZ","t":"Construction of Ampeg-ok CIS Flood Control along Alanod Creek, Kabayan, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"KABAYAN (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CHRISHUA CONSTRUCTION SERVICES","c":29396000.0,"abc":29400000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-11-19","lat":16.65139,"lon":120.828661,"sm":684,"fm":684,"tm":684,"am":684,"md":0.0,"ls":"inside","ww":"Alanod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2013},{"i":2647,"cid":"22PE0052","pid":"P00639449LZ","t":"Construction of Poblacion Flood Control, Bokod, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BOKOD (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"AG CHUNGALAN CONSTRUCTION","c":9789790.48,"abc":9800000.0,"fy":"2022","sd":"06/22/2022","cd":"2022-12-05","lat":16.489499,"lon":120.830624,"sm":217,"fm":217,"tm":217,"am":217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2014},{"i":2648,"cid":"24CC0384","pid":"P00825079LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Tanawan Section, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199138.89,"abc":77199992.23,"fy":"2024","sd":"04/23/2024","cd":"2024-12-18","lat":14.961592,"lon":120.92451,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.26,"wp":[14.96264,120.9224],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2733,2024],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0381 to 24CC0384) cover the same site, together worth PHP 231,597,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":399},{"i":2649,"cid":"21PF0017","pid":"P00526376LZ","t":"Construction of Magmagaling Flood Control, Sta. 4+572 - Sta. 4+800 (L.S.), Sta. 4+406 - Sta. 4+800 (R.S.), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Buguias","deo":"Benguet 2nd District Engineering Office","co":"BTCJR CONSTRUCTION AND ENGINEERING SERVICES","c":29377392.06,"abc":29400000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-07-18","lat":16.771811,"lon":120.830714,"sm":245,"fm":null,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":622.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2015},{"i":2650,"cid":"24CG0002","pid":"P00820281LZ","t":"Rehabilitation of Eroded Pampanga River Bank at San Mateo (Phase I), Arayat, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"ARAYAT (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91095785.63,"abc":96500000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-16","lat":15.20433,"lon":120.796089,"sm":71,"fm":71,"tm":71,"am":71,"md":0.0,"ls":"inside","ww":"Eroded Pampanga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[],"run":[2268,2220],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CG0001 to 24CG0003) cover the same site, together worth PHP 276,542,532.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":325},{"i":2651,"cid":"22DQ0054","pid":"P00621504LZ","t":"Construction of Revetment along Bacoor River, Brgy. Habay I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":77195492.58,"abc":77199995.2,"fy":"2022","sd":"04/07/2022","cd":"2022-10-14","lat":14.45212,"lon":120.9443,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.4522,120.94435],"wst":"matched","br":"Habay I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2016},{"i":2652,"cid":"24CC0162","pid":"P00823423LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay San Juan (Bigaang Matanda), Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":78164572.3,"abc":78164895.56,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.813637,"lon":120.901998,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.04,"wp":[14.81396,120.902],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2017},{"i":2653,"cid":"22OA0051","pid":"P00632706LZ","t":"Construction of Riverwall along Tanza Dike (Phase 2), Barangay Tanza 1, Navotas City","w":"Construction of Dike","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49497745.13,"abc":48994575.0,"fy":"2022","sd":"02/15/2022","cd":"2022-10-12","lat":14.68362,"lon":120.932228,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 1","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01027,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":749},{"i":2654,"cid":"25CF0006","pid":"P00921786LZ","t":"Construction of Alua Slope Protection Structure along Pampanga River, Barangay Alua, Phase 2, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":48754753.43,"abc":48999997.85,"fy":"2025","sd":"02/11/2025","cd":"2025-04-25","lat":15.311522,"lon":120.894051,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.2,"wp":[15.31334,120.89378],"wst":"matched","br":"Alua","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2018},{"i":2655,"cid":"23CD0023","pid":"P00726728LZ","t":"Construction of Flood Control Structure along Meycauayan River, Meycauayan Section (Downstream), Meycauayan Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":48990823.63,"abc":48998667.35,"fy":"2023","sd":"02/22/2023","cd":"2024-04-02","lat":14.734278,"lon":120.932335,"sm":406,"fm":406,"tm":null,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.04,"wp":[14.7339,120.93221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3437,3120,2736,3793],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23CD0021 to 23CD0025) cover the same site, together worth PHP 264,356,660.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":517},{"i":2656,"cid":"23CE0041","pid":"P00725706LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. Concepcion, Sto. Domingo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96495000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-09-04","lat":15.575301,"lon":120.902297,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.14,"wp":[15.57403,120.90242],"wst":"matched","br":"Concepcion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2019},{"i":2657,"cid":"23E00030","pid":"P00736043LZ","t":"Construction of Road Dike/Esplanade along Patrick River, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217123574.4,"abc":217124991.8,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.9219,"lon":120.831,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.07,"wp":[12.92252,120.83126],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2020},{"i":2658,"cid":"22OA0040","pid":"P00621133LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 22), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":57900000.0,"abc":58798945.85,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.701456,"lon":120.924529,"sm":399,"fm":399,"tm":399,"am":409,"md":0.11,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.03,"wp":[14.70164,120.92439],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 22","dup":[],"run":[2563,2722,2361],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2662,2677,2722,2725,2741],"L":"field","s":59,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OA0038 to 22OA0042) cover the same site, together worth PHP 214,290,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":29},{"i":2659,"cid":"24CC0426","pid":"P00843312LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Anilao, Malolos City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":72373936.89,"abc":72374989.85,"fy":"2024","sd":"05/14/2024","cd":"2024-10-22","lat":14.847785,"lon":120.796441,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anilao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2021},{"i":2660,"cid":"23CC0326","pid":"P00742325LZ","t":"Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Culianin, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":49499465.67,"abc":49499902.55,"fy":"2023","sd":"03/27/2023","cd":"2023-07-26","lat":14.910952,"lon":120.8941,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.07,"wp":[14.91098,120.89348],"wst":"matched","br":"Culianin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2022},{"i":2661,"cid":"24OA0010","pid":"P00820539LZ","t":"Construction of Drainage System in Barangay Tanza, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"721 BUILDERS CORPORATION","c":15678833.77,"abc":15679433.12,"fy":"2024","sd":"02/12/2024","cd":"2024-08-09","lat":14.681214,"lon":120.932389,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2023},{"i":2662,"cid":"22OA0007","pid":"P00620348LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 13), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AZUL BUILDERS","c":49000000.0,"abc":48904843.78,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.69558,"lon":120.924564,"sm":399,"fm":399,"tm":399,"am":409,"md":0.17,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.03,"wp":[14.69541,120.92441],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 13","dup":[],"run":[2677,2725,2597,2573,2490,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2677,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":54},{"i":2663,"cid":"22DF0009","pid":"P00620872LZ","t":"Construction of Revetment along Ilang-Ilang River, Brgy. Alapan Section, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":90710000.0,"abc":90710000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-02-09","lat":14.3965,"lon":120.90286,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":4.07,"wp":[14.36675,120.88075],"wst":"matched","br":"Alapan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2024},{"i":2664,"cid":"21CC0291","pid":"P00561463LZ","t":"Construction/Improvement of Bulihan-Longos Creek, Malolos City","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"City of Malolos","deo":"Bulacan 1st District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING / FRAMECON BUILDERS","c":96498474.65,"abc":96499269.8,"fy":"2021","sd":"02/02/2022","cd":"2023-06-23","lat":14.875556,"lon":120.796458,"sm":401,"fm":null,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Bulihan-Longos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2025},{"i":2665,"cid":"23D00158","pid":"P00726945LZ","t":"Construction of Revetment along Ylang-Ylang River, Buenavista, Gen. Trias, Cavite (Phase IV)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR / MOTIONTRADE DEVELOPMENT CORPORATION","c":96498165.29,"abc":96500000.0,"fy":"2023","sd":"07/07/2023","cd":"2024-04-01","lat":14.317694,"lon":120.894674,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ylang-Ylang","wn":"Ylang-ylang River","wd":2.6,"wp":[14.33545,120.9105],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2026},{"i":2666,"cid":"24CD0086","pid":"P00844531LZ","t":"Construction of Flood Control Structure at Obando Tributaries, Sta. 00+231 - Sta. 00+462, Barangay Catanghalan-Pag-asa, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":67549063.5,"abc":67549476.8,"fy":"2024","sd":"03/14/2024","cd":"2024-09-28","lat":14.700707,"lon":120.932467,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catanghalan-Pag-asa","len":231.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2027},{"i":2667,"cid":"23CF0090","pid":"P00740327LZ","t":"Construction of Flood Mitigation Structure with Channel Excavation along Peñaranda River, Barangay San Nicolas, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":96497742.64,"abc":96499976.45,"fy":"2023","sd":"04/17/2023","cd":"2024-02-04","lat":15.30949,"lon":120.92488,"sm":386,"fm":386,"tm":386,"am":1286,"md":0.34,"ls":"boundary","ww":"Peñaranda","wn":"Peñaranda River","wd":0.15,"wp":[15.31018,120.92612],"wst":"matched","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2028},{"i":2668,"cid":"21PF0016","pid":"P00526380LZ","t":"Construction of Papasok-Sibugan Flood Control Sta.5+360 - Sta. 5+863 (L.S.), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Buguias","deo":"Benguet 2nd District Engineering Office","co":"AAAL CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"01/19/2022","cd":"2022-07-22","lat":16.777153,"lon":120.831439,"sm":245,"fm":null,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":503.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2029},{"i":2669,"cid":"22DF0148","pid":"P00637795LZ","t":"Concreting of Drainage System at Barangay Amaya 6, Tanza, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FE S. REYES GENERAL CONTRACTOR CORP.","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-14","lat":14.385228,"lon":120.831514,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Amaya 6","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2030},{"i":2670,"cid":"24DF0210","pid":"P00846047LZ","t":"Construction of Drainage, Barangay Alingaro, General Trias City, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FE S. REYES GENERAL CONTRACTOR CORP.","c":4899267.71,"abc":4950000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-07-23","lat":14.231714,"lon":120.902908,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alingaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2031},{"i":2671,"cid":"24CD0060","pid":"P00821231LZ","t":"Construction of Flood Control Structure along Marilao River and Its Tributaries - Tabon Creek, Sta. 04+200 - Sta. 04+525, Barangay Nagbalon, Marilao, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":94569987.5,"abc":94569810.09,"fy":"2024","sd":"02/14/2024","cd":"2024-09-24","lat":14.745671,"lon":120.944664,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":"Marilao","wn":"Marilao River","wd":0.35,"wp":[14.74416,120.9475],"wst":"matched","br":"Nagbalon","len":325.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2032},{"i":2672,"cid":"23PI0010","pid":"P00735968LZ","t":"Construction of Abit Flood Control along Abit River, Tadian, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"TADIAN (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"FJ MIRANDA CONSTRUCTION","c":28950000.0,"abc":28949999.4,"fy":"2023","sd":"04/10/2023","cd":"2023-06-30","lat":16.955278,"lon":120.833056,"sm":1508,"fm":1508,"tm":1508,"am":1508,"md":0.0,"ls":"inside","ww":"Abit","wn":"Abit River","wd":0.02,"wp":[16.95509,120.83318],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2033},{"i":2673,"cid":"23E00034","pid":"P00736060LZ","t":"Construction of River Control Structure along Nagapi River (Right Side), Sitio Balangabong - Sitio Saycohan Section, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":96495414.86,"abc":96500000.0,"fy":"2023","sd":"03/11/2023","cd":"2023-10-15","lat":12.6105,"lon":120.9447,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Nagapi","wn":"Nagapi River","wd":0.01,"wp":[12.61046,120.94479],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2034},{"i":2674,"cid":"22CC0004","pid":"P00632822LZ","t":"Construction of River Protection along Barangay Pungo, Calumpit, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CALUMPIT (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":13853245.52,"abc":13859396.02,"fy":"2022","sd":"01/28/2022","cd":"2022-07-13","lat":14.9004,"lon":120.7969,"sm":310,"fm":310,"tm":310,"am":310,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pungo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2035},{"i":2675,"cid":"22DF0021","pid":"P00620236LZ","t":"Construction of Revetment along Panamitan River, Brgy. Batong Dalig, Kawit, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"CAVDEAL-CAVITE IDEAL INT'L. CONST. & DEV'T. CORP.","c":59938901.12,"abc":60795000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-10-02","lat":14.435278,"lon":120.894722,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":"Panamitan","wn":"Panamitan River","wd":0.0,"wp":[14.43532,120.89471],"wst":"matched","br":"Batong Dalig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2036},{"i":2676,"cid":"24CE0016","pid":"P00820272LZ","t":"Rehabilitation of Dike along Talavera River, Barangay Concepcion to San Agustin, Santo Domingo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":95533838.11,"abc":96500000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-12","lat":15.575735,"lon":120.902996,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.18,"wp":[15.57409,120.90313],"wst":"matched","br":"Concepcion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2037},{"i":2677,"cid":"22OA0005","pid":"P00620346LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 11), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49000000.0,"abc":48994869.4,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.694035,"lon":120.924952,"sm":399,"fm":399,"tm":399,"am":409,"md":0.24,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.03,"wp":[14.6942,120.92471],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 11","dup":[],"run":[2725,2662,2597,2573,2490,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2722,2725,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":55},{"i":2678,"cid":"21CC0126","pid":"P00561527LZ","t":"Construction of Angat River Flood Control Structure and its Tributaries at Sto. Niño, Paombong, Bulacan, Sta. 00+445 - Sta. 00+641","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Bulacan","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":24499443.85,"abc":24499396.48,"fy":"2021","sd":"01/14/2022","cd":"2022-08-11","lat":14.84031,"lon":120.797,"sm":248,"fm":null,"tm":248,"am":1100,"md":5.32,"ls":"outside","ww":"Angat","wn":"Angat River","wd":3.48,"wp":[14.84449,120.76495],"wst":"matched","br":null,"len":196.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.32,"text":"The pin is 5.3 km outside Bulacan, Bulacan, the nearest municipality the record claims. It falls in Paombong, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":321},{"i":2679,"cid":"23DF0010","pid":"P00725806LZ","t":"Construction of Revetment along Julian River, Barangay Malagasang I-B, West Side, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-11-14","lat":14.39455,"lon":120.932469,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Julian","wn":"Julian River","wd":0.01,"wp":[14.39455,120.93252],"wst":"matched","br":"Malagasang I-B","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2038},{"i":2680,"cid":"24CC0168","pid":"P00823422LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Panginay (Sitio Sulok), Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":78163573.63,"abc":78164870.89,"fy":"2024","sd":"02/28/2024","cd":"2024-06-17","lat":14.802243,"lon":120.903134,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.01,"wp":[14.80235,120.90309],"wst":"matched","br":"Panginay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2039},{"i":2681,"cid":"24CC0008","pid":"P00838385LZ","t":"Construction of Riverbank Protection Structure at Barangay Anilao, Malolos City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":77199993.5,"abc":77199977.27,"fy":"2024","sd":"02/07/2024","cd":"2024-04-19","lat":14.846934,"lon":120.798272,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anilao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2040},{"i":2682,"cid":"22CE0042","pid":"P00620154LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. San Carlos, Aliaga, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":91675000.0,"abc":91675000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-09-05","lat":15.556958,"lon":120.894944,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.07,"wp":[15.55748,120.89528],"wst":"matched","br":"San Carlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2041},{"i":2683,"cid":"24PF0027","pid":"P00821532LZ","t":"Construction of Flood Mitigation Structure along Agno River, Pusong Section, Sta. 0+000 - Sta. 0+360 (B.S), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"NORJOHN CONSTRUCTION","c":29352752.8,"abc":29400000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-07-25","lat":16.798623,"lon":120.833271,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":0.01,"wp":[16.79859,120.83315],"wst":"matched","br":null,"len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2042},{"i":2684,"cid":"23DC0176","pid":"P00746109LZ","t":"Rehabilltation/Reconstruction of Tabangan Bridge Revetment, Barangay Poblacion 4, Laurel Batangas K0092+890","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"JANRA8 BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":3471370.0,"abc":3474000.0,"fy":"2023","sd":"01/05/2024","cd":"2024-02-15","lat":14.057297,"lon":120.932471,"sm":762,"fm":762,"tm":null,"am":762,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2043},{"i":2685,"cid":"23CC0283","pid":"P00742130LZ","t":"Improvement of Waterways and Flood Control Structures along Balagtas River (Tributary), Brgy. Panginay to Wawa, Balagtas, Bulacan (Phase II)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":79199187.57,"abc":79199522.19,"fy":"2023","sd":"05/15/2023","cd":"2024-04-08","lat":14.819064,"lon":120.903598,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.55,"wp":[14.81647,120.90795],"wst":"matched","br":"Panginay","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2044},{"i":2686,"cid":"23AA0305","pid":"P00740560LZ","t":"Construction of Flood Control Structure along Abang Creek (Upstream), Barangay Lanao, Bangui, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"BANGUI (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":19599827.98,"abc":19599856.14,"fy":"2023","sd":"04/12/2023","cd":"2023-10-27","lat":18.523949,"lon":120.798365,"sm":151,"fm":151,"tm":151,"am":151,"md":0.0,"ls":"inside","ww":"Abang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lanao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2045},{"i":2687,"cid":"24CD0111","pid":"P00825103LZ","t":"Construction of Flood Control Structure along Marilao River and Its Tributaries - Tabon Creek, Sta. 04+925 - Sta. 05+125, Barangay Nagbalon, Marilao, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":57899912.04,"abc":57899739.64,"fy":"2024","sd":"03/18/2024","cd":"2024-09-25","lat":14.750387,"lon":120.944756,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":"Marilao","wn":"Marilao River","wd":0.65,"wp":[14.74657,120.94935],"wst":"matched","br":"Nagbalon","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2046},{"i":2688,"cid":"22CC0146","pid":"P00631178LZ","t":"Construction of Flood Control Structure along Angat River at Tanawan, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45078595.32,"abc":45079668.57,"fy":"2022","sd":"03/04/2022","cd":"2022-07-15","lat":14.905556,"lon":120.925,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":3.44,"wp":[14.91017,120.89339],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.44,"text":"The title names Angat, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":388},{"i":2689,"cid":"23CE0118","pid":"P00742333LZ","t":"Construction of Drainage, Brgy. La Purisima, Aliaga, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"ALIAGA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC.","c":5880040.72,"abc":5940000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-24","lat":15.518882,"lon":120.833738,"sm":35,"fm":35,"tm":35,"am":35,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Purisima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2047},{"i":2690,"cid":"22OA0044","pid":"P00632702LZ","t":"Construction of Pumping Station, Adelfa St., Barangay Tanza 1, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"DOUBLE Z CONSTRUCTION AND SUPPLY","c":21753596.88,"abc":21525792.58,"fy":"2022","sd":"02/14/2022","cd":"2022-09-09","lat":14.677215,"lon":120.932517,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01058,"text":"Contract cost is 1.06% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":909},{"i":2691,"cid":"23CC0241","pid":"P00742154LZ","t":"Construction of Flood Mitigation Structures Bulihan- Anilao Creek, Malolos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":98999191.47,"abc":98999963.07,"fy":"2023","sd":"03/28/2023","cd":"2024-03-21","lat":14.847056,"lon":120.798439,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":"Bulihan-Anilao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2048},{"i":2692,"cid":"21PI0014","pid":"P00526267LZ","t":"Construction of Magatiley Flood Control; Sta. 67 +225 - Sta. 67 + 900 (R.S.) along Chico River, Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Bauko","deo":"Mountain Province 1st District Engineering Office","co":"3K ROCK ENGINEERING / OLSIM CONSTRUCTION","c":70693005.0,"abc":70693004.5,"fy":"2021","sd":"04/13/2022","cd":"2022-11-30","lat":16.883513,"lon":120.894964,"sm":189,"fm":null,"tm":189,"am":189,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.0,"wp":[16.88351,120.89498],"wst":"matched","br":null,"len":675.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2049},{"i":2693,"cid":"21AC0030","pid":"P00561623LZ","t":"Construction of Bantay Boardwalk Road along Govantes River, Barangay Bayubay, Bantay, Ilocos Sur","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Bantay","deo":"Ilocos Sur 1st District Engineering Office","co":"N.A. IBARRA CONSTRUCTION(FOR. DIOCLETIANS CONST.)","c":9599225.3,"abc":9900000.0,"fy":"2021","sd":"07/09/2021","cd":"2022-09-14","lat":18.533645,"lon":120.834364,"sm":157,"fm":null,"tm":157,"am":1062,"md":103.55,"ls":"outside","ww":"Govantes","wn":"Govantes River","wd":115.93,"wp":[17.57556,120.3929],"wst":"matched","br":"Bayubay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":103.55,"text":"The pin is 103.5 km outside Bantay, Ilocos Sur, the nearest municipality the record claims. It falls in Pagudpud, Ilocos Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":115.93,"text":"The title names Govantes, which OpenStreetMap maps through the stated municipality, but the pin is 115.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":114},{"i":2694,"cid":"24EB0063","pid":"P00824734LZ","t":"Construction of Flood Control Structure along Mompong River, Pandaitan Section, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":39198579.92,"abc":39200000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-11","lat":12.741188,"lon":120.800094,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Mompong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2050},{"i":2695,"cid":"23CC0399","pid":"P00742319LZ","t":"Rehabilitation of Drainage including Road Barangay Antipona, Bocaue, Bulacan","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":4949400.06,"abc":4949838.29,"fy":"2023","sd":"05/02/2023","cd":"2023-08-29","lat":14.797753,"lon":120.925018,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Antipona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2051},{"i":2696,"cid":"23DQ0076","pid":"P00742182LZ","t":"Construction of River Bank Protection Works along Imus River at Brgy Salinas, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98973894.38,"abc":98999995.95,"fy":"2023","sd":"05/03/2023","cd":"2024-03-04","lat":14.44288,"lon":120.93267,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.02,"wp":[14.44275,120.93273],"wst":"matched","br":"Salinas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2052},{"i":2697,"cid":"22DF0018","pid":"P00621096LZ","t":"Construction of Revetment along Imus River, Brgy. Buhay na Tubig Section, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FROMARC BUILDERS & GEN. MERCHANDISE","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-29","lat":14.42051,"lon":120.94479,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.42051,120.9448],"wst":"matched","br":"Buhay na Tubig Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2053},{"i":2698,"cid":"24CG0118","pid":"P00846003LZ","t":"Construction of Slope Protection Structure along Sitio Matique Creek, Brgy. San Nicolas, San Luis, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"SAN LUIS (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":37897215.45,"abc":39600000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-11-22","lat":15.050222,"lon":120.800525,"sm":1319,"fm":1319,"tm":1319,"am":1319,"md":0.0,"ls":"inside","ww":"Sitio Matique","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2054},{"i":2699,"cid":"24C00526","pid":"P00845989LZ","t":"Construction of Revetment along Maguinao Creek, Barangay Maguinao, San Rafael, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"CALCON ENGINEERING","c":9899927.01,"abc":9899078.75,"fy":"2024","sd":"07/29/2024","cd":"2024-11-25","lat":15.017647,"lon":120.932883,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maguinao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maguinao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2055},{"i":2700,"cid":"25CF0028","pid":"P00921485LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Malapit, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING","c":96017500.53,"abc":96499900.04,"fy":"2025","sd":"02/20/2025","cd":"2025-04-24","lat":15.309594,"lon":120.925073,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.13,"wp":[15.31017,120.92612],"wst":"matched","br":"Malapit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2056},{"i":2701,"cid":"23CE0014","pid":"P00726165LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Bantug, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48994113.37,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-10","lat":15.566778,"lon":120.903713,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.05,"wp":[15.56716,120.90351],"wst":"matched","br":"Bantug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2057},{"i":2702,"cid":"23E00033","pid":"P00736059LZ","t":"Construction of River Control Structure along Nagapi River (Left Side), Sitio Balangabong - Sitio Saycohan Section, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":96497636.2,"abc":96500000.0,"fy":"2023","sd":"03/11/2023","cd":"2023-10-15","lat":12.6097,"lon":120.9448,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Nagapi","wn":"Nagapi River","wd":0.02,"wp":[12.60976,120.94465],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2058},{"i":2703,"cid":"24CC0200","pid":"P00838364LZ","t":"Construction of Reinforced Concrete Slope Revetment at Barangay Canalate, Malolos City, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF MALOLOS (CAPITAL) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":62724600.0,"abc":62724977.17,"fy":"2024","sd":"03/20/2024","cd":"2024-09-30","lat":14.838658,"lon":120.800737,"sm":401,"fm":401,"tm":401,"am":401,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canalate","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2059},{"i":2704,"cid":"23DB0091","pid":"P00726931LZ","t":"Construction of Flood Control Structures along Lemery-Taal Diversion Road, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"AARCON BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/01/2023","cd":"2024-11-20","lat":13.920449,"lon":120.894997,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2060},{"i":2705,"cid":"21AA0087","pid":"P00561456LZ","t":"Construction/Rehabilitation of Flood Control Revetment at Upper Datag, Right Bank along Bolo River, Baranga San Isidro, Dumalneg, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"Dumalneg","deo":"Ilocos Norte 1st District Engineering Office","co":"FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS)","c":96499537.05,"abc":96499540.54,"fy":"2021","sd":"12/24/2021","cd":"2022-07-15","lat":18.53324,"lon":120.835069,"sm":537,"fm":null,"tm":537,"am":1062,"md":0.05,"ls":"boundary","ww":"Bolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2061},{"i":2706,"cid":"24CD0109","pid":"P00825086LZ","t":"Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+636 - Sta. 02+756, Obando, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":96499979.13,"abc":96499997.69,"fy":"2024","sd":"06/05/2024","cd":"2025-02-26","lat":14.736385,"lon":120.925216,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.09,"wp":[14.73712,120.92559],"wst":"matched","br":"Tawiran","len":120.0,"ph":null,"dup":[],"run":[2308,2317,2385,2537],"cl":[],"L":"field","s":63,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24CD0105 to 24CD0109) cover the same site, together worth PHP 482,499,381.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.53,"value":804166,"text":"About PHP 804,166 per metre over 120 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":11},{"i":2707,"cid":"23E00029","pid":"P00736042LZ","t":"Construction of Paetan-Victoria Riverbank Protection Structure with Road Component, Sablayan, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":212298471.2,"abc":212299999.9,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":12.8765,"lon":120.8354,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Paetan-Victoria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2062},{"i":2708,"cid":"22PF0110","pid":"P00639460LZ","t":"Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BUGUIAS (BENGUET)","deo":"Benguet 2nd District Engineering Office","co":"CABUGUIASAN BUILDERS","c":48990442.38,"abc":49000000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-05-27","lat":16.7057,"lon":120.801021,"sm":245,"fm":245,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2063},{"i":2709,"cid":"23CC0160","pid":"P00727128LZ","t":"Construction of Flood Control Structure Cambaog-Talampas Tributaries of Angat River, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48999700.67,"abc":48999900.38,"fy":"2023","sd":"03/07/2023","cd":"2023-09-25","lat":14.933055,"lon":120.895278,"sm":265,"fm":1152,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.02,"wp":[14.93315,120.8951],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2064},{"i":2710,"cid":"22CC0216","pid":"P00621533LZ","t":"Construction of Flood Control Structures along Bocaue River Sta. 00+398 to Sta. 00+598 Brgy. Taal, Bocaue, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":24497191.23,"abc":24499419.14,"fy":"2022","sd":"04/04/2022","cd":"2022-09-30","lat":14.809396,"lon":120.9329,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Taal","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2065},{"i":2711,"cid":"24CF0034","pid":"P00839586LZ","t":"Construction of Lined Canal along Road, San Isidro, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"TRIPLE S BUILDERS INC.","c":4875082.5,"abc":4949990.75,"fy":"2024","sd":"02/16/2024","cd":"2024-12-20","lat":15.311256,"lon":120.903952,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Lined","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2066},{"i":2712,"cid":"23OD0095","pid":"P00726806LZ","t":"Construction of Flood Control Wall along Polo River (Phase 2), Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94371376.95,"abc":96494257.32,"fy":"2023","sd":"04/20/2023","cd":"2024-06-11","lat":14.712672,"lon":120.944996,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Polo","wn":"Polo River","wd":0.03,"wp":[14.7128,120.94525],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2067},{"i":2713,"cid":"23DF0087","pid":"P00742181LZ","t":"Construction of Tetrapods, Brgy. Capipisa-Brgy. Halayhay, Tanza, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":49478805.76,"abc":49500000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-12-31","lat":14.370062,"lon":120.802146,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capipisa-Brgy. Halayhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2068},{"i":2714,"cid":"23CC0086","pid":"P00726721LZ","t":"Improvement of Waterways and Construction of Concrete Revetment along Angat River Bonga Menor Section, K000 + 0000 - K000 + 130, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":48999985.43,"abc":48999788.21,"fy":"2023","sd":"02/06/2023","cd":"2023-07-03","lat":14.960049,"lon":120.932984,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.09,"wp":[14.96088,120.93318],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2069},{"i":2715,"cid":"23CC0163","pid":"P00726458LZ","t":"Construction of River Control Project along Angat River, Tanawan Section, Sta. 03+610 - Sta. 04+010, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":96499992.4,"abc":96499408.05,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.960534,"lon":120.925231,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.38,"wp":[14.96233,120.92222],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2070},{"i":2716,"cid":"22CC0271","pid":"P00621286LZ","t":"Improvement of Waterway and Flood Control Structure along Balagtas River (Tributary) Brgy. Panginay to Wawa, Balagtas, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":69479572.96,"abc":69478084.33,"fy":"2022","sd":"04/05/2022","cd":"2023-01-29","lat":14.819444,"lon":120.904444,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.5,"wp":[14.81684,120.90818],"wst":"matched","br":"Panginay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2071},{"i":2717,"cid":"22OA0019","pid":"P00620345LZ","t":"Construction of Riverwall along South Pinagkabalian River (Phase 8), Brgy. Panghulo, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":49000000.0,"abc":48987115.38,"fy":"2022","sd":"02/14/2022","cd":"2022-10-26","lat":14.687175,"lon":120.945121,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"South Pinagkabalian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Panghulo","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2072},{"i":2718,"cid":"21PF0026","pid":"P00526377LZ","t":"Construction of Baney Flood Control Sta. 1+445 - Sta. 2+777 (R.S.), Buguias, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"Buguias","deo":"Benguet 2nd District Engineering Office","co":"NORJOHN CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"02/27/2022","cd":"2022-09-29","lat":16.747717,"lon":120.835989,"sm":245,"fm":null,"tm":245,"am":245,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1332.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2073},{"i":2719,"cid":"24CC0343","pid":"P00821577LZ","t":"Construction of River Protection Structure and Rehabilitation of Waterway along Angat River, K010+793 to K010+943, Barangay Cambaog, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":48999725.3,"abc":48999906.9,"fy":"2024","sd":"04/18/2024","cd":"2024-09-23","lat":14.933077,"lon":120.895379,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.93321,120.89514],"wst":"matched","br":"Cambaog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2074},{"i":2720,"cid":"22PI0038","pid":"P00630930LZ","t":"Construction of ABIT Flood Control along Abit River, Tadian, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"TADIAN (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"OLSIM CONSTRUCTION / BALLIGI CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY:BALLIGI CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":96500000.0,"abc":96499999.4,"fy":"2022","sd":"03/01/2022","cd":"2023-01-03","lat":16.95444,"lon":120.83638,"sm":1508,"fm":1508,"tm":1508,"am":1508,"md":0.0,"ls":"inside","ww":"Abit","wn":"Abit River","wd":0.04,"wp":[16.95478,120.83652],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2075},{"i":2721,"cid":"23C00162","pid":"P00726888LZ","t":"Construction of Slope Protection Works at Malasik River (Salapungan Section) Barangay Salapungan, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) / DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC.","c":144750000.0,"abc":144749616.9,"fy":"2023","sd":"08/21/2023","cd":"2024-05-16","lat":15.122864,"lon":120.93308,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salapungan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2076},{"i":2722,"cid":"22OA0039","pid":"P00621153LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 21), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":57900000.0,"abc":58792739.32,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.702068,"lon":120.925247,"sm":399,"fm":399,"tm":399,"am":409,"md":0.11,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.02,"wp":[14.70219,120.92515],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 21","dup":[],"run":[2563,2658,2361],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2725,2741],"L":"field","s":59,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OA0038 to 22OA0042) cover the same site, together worth PHP 214,290,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":30},{"i":2723,"cid":"24OA0027","pid":"P00820529LZ","t":"Construction of Box Culvert along M. Naval St., from Badeo 2 to F. Pascual St., Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48999918.01,"abc":48999809.05,"fy":"2024","sd":"02/12/2024","cd":"2024-12-09","lat":14.662921,"lon":120.945383,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2077},{"i":2724,"cid":"22CC0316","pid":"P00639470LZ","t":"Construction of Flood Control Structure including Outfall along Brgy. Virgen Delos Flores, Sta. Barbara & Tiaong, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS / SYMS CONSTRUCTION TRADING","c":47519329.41,"abc":49499858.85,"fy":"2022","sd":"04/05/2022","cd":"2022-11-04","lat":14.940725,"lon":120.895463,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Virgen Delos Flores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2078},{"i":2725,"cid":"22OA0006","pid":"P00620347LZ","t":"Construction of Riverwall and Road Dike along Batasan River (Phase 12), Brgy. Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":49000000.0,"abc":48942382.1,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.694862,"lon":120.925261,"sm":399,"fm":399,"tm":399,"am":409,"md":0.16,"ls":"boundary","ww":"Batasan","wn":"Batasan River","wd":0.01,"wp":[14.6948,120.92514],"wst":"matched","br":"Dampalit","len":null,"ph":"Phase 12","dup":[],"run":[2677,2662,2597,2573,2490,2405,2389,2364,2396],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2741],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OA0005 to 22OA0015) cover the same site, together worth PHP 490,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":56},{"i":2726,"cid":"21OA0056","pid":"P00561465LZ","t":"Construction of Floodwall and Upgrading of Road with Drainage System along Adelfa St., Barangay Tanza 1, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"City of Navotas","deo":"Malabon-Navotas District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":67504048.83,"abc":68594595.17,"fy":"2021","sd":"11/15/2021","cd":"2022-11-16","lat":14.679721,"lon":120.933605,"sm":409,"fm":null,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2079},{"i":2727,"cid":"23EB0021","pid":"P00726262LZ","t":"Construction of Flood Control Structure along Patrick River, Barangay Paetan Section, Sta. 0+000 - Sta. 0+394, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":45078037.4,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-22","lat":12.91916,"lon":120.83651,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Patrick","wn":"Patrick River","wd":0.12,"wp":[12.92006,120.83718],"wst":"matched","br":"Paetan Section","len":394.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2080},{"i":2728,"cid":"22DF0261","pid":"P00637079LZ","t":"Construction of Drainage at Barangay Tanzang Luma V, Imus, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":4900000.0,"abc":4900000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-09-05","lat":14.41361,"lon":120.94541,"sm":638,"fm":638,"tm":638,"am":638,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanzang Luma V","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2081},{"i":2729,"cid":"23PI0002","pid":"P00736184LZ","t":"Construction of Chico River Flood Control, Tamog-o Section at Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BAUKO (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"OLSIM CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":49000000.0,"abc":48999999.5,"fy":"2023","sd":"02/20/2023","cd":"2023-08-23","lat":16.881389,"lon":120.895556,"sm":189,"fm":189,"tm":189,"am":189,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[16.88157,120.89581],"wst":"matched","br":"Monamon Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2082},{"i":2730,"cid":"24CC0050","pid":"P00838387LZ","t":"Construction of Riverbank Protection Structure at Barangay Bagbaguin, Pandi, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PANDI (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":96499404.34,"abc":96499868.11,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.881737,"lon":120.904694,"sm":1084,"fm":1084,"tm":1084,"am":1084,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbaguin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2083},{"i":2731,"cid":"22DE0116","pid":"P00631281LZ","t":"Construction of Flood Control at Brgy. Solo, Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)","c":14550732.41,"abc":19600000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-17","lat":13.74312,"lon":120.90473,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Solo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2084},{"i":2732,"cid":"24CG0016","pid":"P00820254LZ","t":"Construction of Slope Protection at Malisik River, Phase III (San Agustin Section), Barangay San Agustin, Candaba, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":78857241.02,"abc":83535225.0,"fy":"2024","sd":"03/01/2024","cd":"2024-10-21","lat":15.087459,"lon":120.836976,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Agustin","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2085},{"i":2733,"cid":"24CC0381","pid":"P00825071LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Angat River, Cambaog Section, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":77199080.42,"abc":77199978.6,"fy":"2024","sd":"04/23/2024","cd":"2024-08-29","lat":14.933821,"lon":120.895749,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.93393,120.89552],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2024,2648],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0381 to 24CC0384) cover the same site, together worth PHP 231,597,891.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":400},{"i":2734,"cid":"24CC0166","pid":"P00823406LZ","t":"Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Dalig (Purok 2 to Purok 3), Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":77199558.49,"abc":77199806.99,"fy":"2024","sd":"03/11/2024","cd":"2024-11-05","lat":14.833763,"lon":120.925434,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.83378,120.92561],"wst":"matched","br":"Dalig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2086},{"i":2735,"cid":"22CC0213","pid":"P00639352LZ","t":"Construction of Riverbank Protection along Bocaue River Brgy. Taal Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":57899155.37,"abc":57899164.78,"fy":"2022","sd":"04/04/2022","cd":"2023-01-27","lat":14.809287,"lon":120.93364,"sm":216,"fm":216,"tm":248,"am":216,"md":0.0,"ls":"inside","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Taal Bocaue","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.06,"text":"The record contradicts itself: the municipality field and the pin point to Bocaue, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":494},{"i":2736,"cid":"23CD0024","pid":"P00726727LZ","t":"Construction of Flood Control Structure along Meycauayan River, Meycauayan Section (Upstream), Meycauayan Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48999966.54,"abc":48999460.17,"fy":"2023","sd":"02/22/2023","cd":"2023-08-12","lat":14.739685,"lon":120.945603,"sm":406,"fm":406,"tm":null,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.02,"wp":[14.73951,120.9457],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3437,3120,2655,3793],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23CD0021 to 23CD0025) cover the same site, together worth PHP 264,356,660.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":518},{"i":2737,"cid":"24EB0075","pid":"P00824746LZ","t":"Construction of Flood Control Structure along Pandurucan Riverbank, Brgy. Pag-asa, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"J.H.R. ENTERPRISES","c":24499178.88,"abc":24500000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-09-07","lat":12.940167,"lon":120.895858,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Pandurucan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pag-asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2087},{"i":2738,"cid":"23CG0080","pid":"P00726892LZ","t":"Construction of Slope Protection Works at Malasik River, Phase I (San Agustin Section) Barangay San Agustin, Candaba, Pampanga.","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91095254.13,"abc":96500000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-11","lat":15.08787,"lon":120.837183,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Agustin","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2088},{"i":2739,"cid":"22CF0105","pid":"P00621578LZ","t":"Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins- Construction of Flood Control Mitigation Structure along Pampanga River, Poblacion, San Isidro, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ISIDRO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"JPB CONSTRUCTION / FRAMECON BUILDERS","c":63685822.86,"abc":72374980.66,"fy":"2022","sd":"04/05/2022","cd":"2023-12-24","lat":15.312268,"lon":120.904766,"sm":1286,"fm":1286,"tm":1286,"am":1286,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.17,"wp":[15.31376,120.90458],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2089},{"i":2740,"cid":"24OA0044","pid":"P00839459LZ","t":"Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 7), Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":59399880.03,"abc":59353337.37,"fy":"2024","sd":"02/21/2024","cd":"2024-09-20","lat":14.678498,"lon":120.945699,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Dampalit","wn":"Dampalit River","wd":0.01,"wp":[14.67841,120.94561],"wst":"matched","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[2495,2603],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OA0042 to 24OA0044) cover the same site, together worth PHP 188,096,203.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":424},{"i":2741,"cid":"23OA0014","pid":"P00725923LZ","t":"Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 4)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":49000000.0,"abc":48998795.7,"fy":"2023","sd":"02/15/2023","cd":"2023-10-12","lat":14.699778,"lon":120.925461,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampalit","len":null,"ph":"Phase 4","dup":[],"run":[2188,2120],"cl":[2120,2130,2175,2188,2228,2252,2278,2322,2347,2361,2364,2389,2394,2396,2400,2405,2490,2563,2573,2597,2658,2662,2677,2722,2725],"L":"field","s":58,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OA0013 to 23OA0015) cover the same site, together worth PHP 147,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.6,"value":26,"text":"26 separate contracts name Barangay Dampalit (2021 to 2024), totalling PHP 1,283,448,200.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":57},{"i":2742,"cid":"24CD0087","pid":"P00844745LZ","t":"Construction of Flood Control Structure at Obando Tributaries, Sta. 00+462 - Sta. 00+625, Barangay Catanghalan-Pag-asa, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":48998769.87,"abc":48999963.58,"fy":"2024","sd":"03/14/2024","cd":"2024-09-10","lat":14.702413,"lon":120.933667,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catanghalan-Pag-asa","len":163.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2090},{"i":2743,"cid":"23AA0307","pid":"P00740562LZ","t":"Construction of Flood Control Structure along Barangay Caunayan, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48999699.11,"abc":48999699.95,"fy":"2023","sd":"05/05/2023","cd":"2023-12-06","lat":18.62218,"lon":120.837642,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caunayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2091},{"i":2744,"cid":"23CC0098","pid":"P00726492LZ","t":"Construction of River Control Project along Balagtas River, San Juan Secton, Sta. 09+810 - Sta. 10+015, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":96498811.15,"abc":96499358.66,"fy":"2023","sd":"02/13/2023","cd":"2023-07-26","lat":14.812707,"lon":120.905445,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.81269,120.90543],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2092},{"i":2745,"cid":"24OA0041","pid":"P00820550LZ","t":"Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 8), Barangay Muzon, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":45332528.34,"abc":45329878.09,"fy":"2024","sd":"02/21/2024","cd":"2024-10-09","lat":14.678465,"lon":120.945751,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 8","dup":[],"run":[2949,2940,2908,2907,2905],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":580},{"i":2746,"cid":"24CC0344","pid":"P00821576LZ","t":"Construction of River Protection Structure and Rehabilitation of Waterway along Angat River, K000+551 to K000+701, Barangay Bonga Menor, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WRO CONST. CORP. / GRACE CONSTRUCTION CORPORATION","c":48999739.43,"abc":48999914.7,"fy":"2024","sd":"04/18/2024","cd":"2024-08-20","lat":14.959875,"lon":120.933932,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.09,"wp":[14.96069,120.9341],"wst":"matched","br":"Bonga Menor","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2093},{"i":2747,"cid":"23OA0069","pid":"P00742228LZ","t":"Construction of Box Culvert Oliveros to J. Pascual Buenaventura, Tangos North, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"721 BUILDERS CORPORATION","c":21778384.66,"abc":21779824.36,"fy":"2023","sd":"03/27/2023","cd":"2024-06-30","lat":14.674805,"lon":120.934534,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2094},{"i":2748,"cid":"23DF0090","pid":"P00726554LZ","t":"Construction of Revetment along Ilang-Ilang River, Barangay Alapan Section, Phase II, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FROMARC BUILDERS & GEN. MERCHANDISE","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"04/02/2023","cd":"2024-01-01","lat":14.393056,"lon":120.905556,"sm":638,"fm":638,"tm":638,"am":387,"md":0.04,"ls":"boundary","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.95,"wp":[14.36675,120.88075],"wst":"matched","br":"Alapan Section","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2095},{"i":2749,"cid":"23DF0133","pid":"P00745428LZ","t":"Construction of Revetment along Imus River, Brgy. Anabu 1C Imus City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":38971524.94,"abc":38971525.0,"fy":"2023","sd":"07/03/2023","cd":"2024-01-03","lat":14.369472,"lon":120.945861,"sm":638,"fm":638,"tm":360,"am":638,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.48,"wp":[14.37123,120.9418],"wst":"matched","br":"Anabu 1C Imus City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.34,"text":"The record contradicts itself: the municipality field and the pin point to Imus City, Cavite, but the title names Cavite City, Cavite, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":559},{"i":2750,"cid":"24DC0055","pid":"P00820372LZ","t":"Construction of Riverbank Protection along Pansipit River, Agoncillo - San Nicolas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"AGONCILLO (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":57263814.85,"abc":86850000.0,"fy":"2024","sd":"04/03/2024","cd":"2024-09-09","lat":13.921162,"lon":120.934624,"sm":9,"fm":9,"tm":180,"am":1342,"md":0.01,"ls":"boundary","ww":"Pansipit","wn":"Pansipit River","wd":0.02,"wp":[13.92131,120.93452],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.86,"text":"The record contradicts itself: the municipality field and the pin point to Agoncillo, Batangas, but the title names Batangas City, Batangas, 17 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":495},{"i":2751,"cid":"24E00014","pid":"P00820397LZ","t":"Construction of Flood Control Structure along Nagapi River, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"MARCBILT CONSTRUCTION, INC.","c":191067795.2,"abc":191070000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-08-15","lat":12.646758,"lon":120.94598,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Nagapi","wn":"Nagapi River","wd":0.04,"wp":[12.64676,120.9456],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2096},{"i":2752,"cid":"22CC0299","pid":"P00639472LZ","t":"Construction of Riverbank Protection along Balagtas River Brgy. Wawa, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":29390679.34,"abc":29399973.33,"fy":"2022","sd":"04/05/2022","cd":"2022-09-01","lat":14.813004,"lon":120.905679,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.04,"wp":[14.81267,120.90546],"wst":"matched","br":"Wawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2097},{"i":2753,"cid":"23OA0036","pid":"P00742220LZ","t":"Construction of Sagisag Pumping Station, Brgy. Tanza 1, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":24746253.23,"abc":24745215.8,"fy":"2023","sd":"03/27/2023","cd":"2023-11-21","lat":14.676111,"lon":120.934723,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanza 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2098},{"i":2754,"cid":"23E00152","pid":"P00740425LZ","t":"Construction of Flood Control Structure along Nagapi River, Malpalon Section (LS), Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"MARCBILT CONSTRUCTION, INC. / SAN MARCELINO BUILDERS, INC.","c":192981036.1,"abc":192999992.0,"fy":"2023","sd":"04/13/2023","cd":"2023-12-10","lat":12.6117,"lon":120.9461,"sm":307,"fm":307,"tm":null,"am":307,"md":0.0,"ls":"inside","ww":"Nagapi","wn":"Nagapi River","wd":0.01,"wp":[12.61174,120.94607],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2099},{"i":2755,"cid":"22CC0190","pid":"P00621280LZ","t":"Construction of Slope Protection along Balagtas River, Sta. 01 + 947 to Sta. 02 + 237, San Juan Section, Balagtas, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DMLC BUILDERS","c":67548651.76,"abc":67549623.79,"fy":"2022","sd":"04/04/2022","cd":"2022-12-29","lat":14.812513,"lon":120.905731,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.0,"wp":[14.81251,120.90573],"wst":"matched","br":null,"len":290.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2100},{"i":2756,"cid":"22CD0016","pid":"P00620152LZ","t":"Construction of Flood Control Structure along Maguinao Creek, Phase II, along Daang Maharlika Highway, Maguinao, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":48173390.52,"abc":55004786.39,"fy":"2022","sd":"03/07/2022","cd":"2022-10-05","lat":15.01815,"lon":120.93474,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maguinao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2101},{"i":2757,"cid":"23DQ0016","pid":"P00725813LZ","t":"Construction of Revetment along Bacoor River, Barangay Kaingen, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":86849658.99,"abc":86849994.61,"fy":"2023","sd":"02/15/2023","cd":"2023-12-29","lat":14.45668,"lon":120.94613,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.39,"wp":[14.45316,120.94616],"wst":"matched","br":"Kaingen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2102},{"i":2758,"cid":"22CC0139","pid":"P00632811LZ","t":"Construction of Drainage Canal along Barangays Subic, Tibag and Sabang, Baliuag, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":19799997.15,"abc":19799143.86,"fy":"2022","sd":"02/14/2022","cd":"2022-10-11","lat":14.962378,"lon":120.905736,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Subic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2103},{"i":2759,"cid":"23DB0117","pid":"P00742384LZ","t":"Construction of Flood Mitigation Structures in Barangay Malinis, Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":9601500.0,"abc":9898760.0,"fy":"2023","sd":"03/23/2023","cd":"2023-07-20","lat":13.896554,"lon":120.906045,"sm":769,"fm":769,"tm":769,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malinis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2104},{"i":2760,"cid":"22DC0054","pid":"P00620561LZ","t":"Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LAUREL (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":38947059.61,"abc":38952060.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-11","lat":14.047873,"lon":120.934878,"sm":762,"fm":762,"tm":762,"am":762,"md":0.0,"ls":"inside","ww":"Bugaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2105},{"i":2761,"cid":"24CC0399","pid":"P00820228LZ","t":"Construction of Flood Control Structure, Barangay San Juan, Wawa, and Panginay, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":151504905.3,"abc":151504915.2,"fy":"2024","sd":"04/23/2024","cd":"2024-09-30","lat":14.82535,"lon":120.906313,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2106},{"i":2762,"cid":"22OA0089","pid":"P00639402LZ","t":"Rehabilitation (Completion) of Drainage including Upgrading of Road along F. Pascual St., Brgy Tangos South, Navotas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"SAMARAH CONSTRUCTION AND SUPPLY","c":1959713.52,"abc":1955438.57,"fy":"2022","sd":"03/24/2022","cd":"2022-08-12","lat":14.673181,"lon":120.934978,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos South","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2107},{"i":2763,"cid":"24DF0052","pid":"P00821334LZ","t":"Construction of Revetment along Ilang-Ilang River, Barangay Alapan Section, Phase III, Imus, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"FROMARC BUILDERS & GEN. MERCHANDISE","c":95536158.53,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-11-16","lat":14.385864,"lon":120.90645,"sm":638,"fm":638,"tm":638,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":3.49,"wp":[14.36675,120.88075],"wst":"matched","br":"Alapan Section","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2108},{"i":2764,"cid":"23CE0082","pid":"P00742128LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. Poblacion Sur, Talavera, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":98995000.0,"abc":99000000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-11-17","lat":15.574448,"lon":120.907244,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.5748,120.90708],"wst":"matched","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2109},{"i":2765,"cid":"22CC0137","pid":"P00631176LZ","t":"Construction of Flood Control Structure along Angat River (Sta. 0 + 672 - Sta. 1 + 007), San Pedro and Poblacion Section, Bustos and Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TBB CONSTRUCTION CORP.","c":45073035.02,"abc":45079268.16,"fy":"2022","sd":"03/04/2022","cd":"2022-11-28","lat":14.956359,"lon":120.90756,"sm":136,"fm":136,"tm":248,"am":265,"md":0.04,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.02,"wp":[14.9565,120.9074],"wst":"matched","br":null,"len":335.0,"ph":null,"dup":[],"run":[2898,2641],"cl":[],"L":"records","s":47,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.05,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 15 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0136 to 22CC0138) cover the same site, together worth PHP 152,868,005.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":216},{"i":2766,"cid":"23EB0024","pid":"P00726260LZ","t":"Construction of Patrick Flood Control (Kambingan Section), Sta. 0+000 - Sta. 0+433, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":45079616.63,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-09-17","lat":12.89758,"lon":120.90763,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":433.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2110},{"i":2767,"cid":"23CE0052","pid":"P00725707LZ","t":"Rehabilitation of Dike along Talavera River, Brgy. San Agustin, Sto. Domingo, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":96495000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-09-04","lat":15.584843,"lon":120.907714,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.14,"wp":[15.58399,120.90863],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2111},{"i":2768,"cid":"23CC0209","pid":"P00740589LZ","t":"Construction of River Protection along Balagtas River, K013 + 060 to K013 + 164, San Juan Section, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":48998428.1,"abc":48999715.39,"fy":"2023","sd":"03/21/2023","cd":"2023-12-13","lat":14.81351,"lon":120.90836,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.03,"wp":[14.81324,120.90835],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2112},{"i":2769,"cid":"23CG0141","pid":"P00726925LZ","t":"Rehabilitation of River Channel and Slope Protection of Maasim River, Pulung Gubat Section, Candaba, Pampanga","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"EDDMARI CONSTRUCTION & TRADING","c":91192428.63,"abc":96500000.0,"fy":"2023","sd":"08/16/2023","cd":"2024-06-07","lat":15.044009,"lon":120.908617,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.01,"wp":[15.04403,120.90857],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2113},{"i":2770,"cid":"24CG0014","pid":"P00820255LZ","t":"Construction of Slope Protection at Malisik River, Phase III, Barangay Barangca, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":78798026.13,"abc":83472500.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-01","lat":15.121146,"lon":120.9088,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barangca","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2114},{"i":2771,"cid":"23CG0140","pid":"P00726917LZ","t":"Construction of Slope Protection works at Malisik River Phase II barangay Barangca, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68394358.97,"abc":72375000.0,"fy":"2023","sd":"08/16/2023","cd":"2024-04-25","lat":15.121504,"lon":120.908904,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barangca","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2115},{"i":2772,"cid":"22CC0072","pid":"P00630944LZ","t":"Improvement of Waterways with Flood Control Structures along Balagtas River, Sta. 0 + 000 to Sta. 0 + 540, Wawa, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":62724996.89,"abc":62724868.57,"fy":"2022","sd":"02/24/2022","cd":"2022-11-20","lat":14.81252,"lon":120.908938,"sm":117,"fm":117,"tm":117,"am":117,"md":0.0,"ls":"inside","ww":"Balagtas","wn":"Balagtas River","wd":0.02,"wp":[14.81233,120.90906],"wst":"matched","br":null,"len":540.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2116},{"i":2773,"cid":"23DB0116","pid":"P00742383LZ","t":"Construction of Flood Mitigation Structure in the Municipality of Lemery, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LEMERY (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"OMNICON BUILDERS","c":5940000.0,"abc":5940000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-08-31","lat":13.897181,"lon":120.908989,"sm":769,"fm":769,"tm":180,"am":769,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.93,"text":"The record contradicts itself: the municipality field and the pin point to Lemery, Batangas, but the title names Batangas City, Batangas, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":622},{"i":2774,"cid":"23CG0097","pid":"P00740329LZ","t":"Rehabilitation of River Channel & Construction of Concrete Slope Protection of Malisik River Control, Magumbali, Candaba, Pampanga","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":91095547.48,"abc":96500000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-02-15","lat":15.1219,"lon":120.90902,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2117},{"i":2775,"cid":"24PI0026","pid":"P00821544LZ","t":"Construction of Supang Flood Control, Bisibisan Section along Bayudan-Chico River, Sabangan, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"SABANGAN (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"DD LIKIGAN CONSTRUCTION","c":19600000.0,"abc":19599999.5,"fy":"2024","sd":"02/18/2024","cd":"2024-06-07","lat":17.00786,"lon":120.90924,"sm":1226,"fm":1226,"tm":1226,"am":1226,"md":0.0,"ls":"inside","ww":"Bayudan-Chico","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2118},{"i":2776,"cid":"24CG0015","pid":"P00820256LZ","t":"Construction of Slope Protection at Malisik River, Phase IV, Barangay Barangca, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":78798035.64,"abc":83472500.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-01","lat":15.120429,"lon":120.909416,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barangca","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2119},{"i":2777,"cid":"24CD0097","pid":"P00823401LZ","t":"Construction of Flood Control Structure along Bocaue - Santa Maria River, Sta. 02 + 200 - Sta. 02 + 350 (Phase 2), Barangay Ubihan, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499969.85,"abc":96499639.1,"fy":"2024","sd":"03/14/2024","cd":"2025-02-20","lat":14.758968,"lon":120.909548,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.6,"wp":[14.7735,120.92851],"wst":"matched","br":"Ubihan","len":150.0,"ph":"Phase 2","dup":[],"run":[2780,2778],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0096 to 24CD0098) cover the same site, together worth PHP 289,499,710.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":206},{"i":2778,"cid":"24CD0098","pid":"P00823403LZ","t":"Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 350 - Sta 02 + 500 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499750.1,"abc":96499814.82,"fy":"2024","sd":"03/14/2024","cd":"2025-01-06","lat":14.760779,"lon":120.909717,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.47,"wp":[14.7735,120.92851],"wst":"matched","br":"Ubihan","len":150.0,"ph":"Phase 1","dup":[],"run":[2780,2777],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0096 to 24CD0098) cover the same site, together worth PHP 289,499,710.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":270},{"i":2779,"cid":"23CG0132","pid":"P00726916LZ","t":"Construction of slope Protection works at Malisik River Phase I, barangay Barangca, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":70203736.33,"abc":72375000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-12-21","lat":15.123357,"lon":120.909915,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barangca","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2120},{"i":2780,"cid":"24CD0096","pid":"P00823402LZ","t":"Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499989.7,"abc":96499652.61,"fy":"2024","sd":"03/14/2024","cd":"2025-02-20","lat":14.757197,"lon":120.909954,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.69,"wp":[14.7735,120.92851],"wst":"matched","br":"Ubihan","len":150.0,"ph":"Phase 1","dup":[],"run":[2777,2778],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0096 to 24CD0098) cover the same site, together worth PHP 289,499,710.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":207},{"i":2781,"cid":"22CF0132","pid":"P00644777LZ","t":"Rehabilitation of Pampanga River Flood Control, Brgy. Sto. Tomas North, Jaen, Nueva Ecija, Sta. 42 + 300.40 to Sta. 42 + 564.40","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"JAEN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING","c":17237694.73,"abc":17427890.13,"fy":"2022","sd":"03/20/2023","cd":"2023-08-30","lat":15.38355,"lon":120.90997,"sm":659,"fm":659,"tm":659,"am":659,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.96,"wp":[15.37716,120.916],"wst":"matched","br":"Sto. Tomas North","len":264.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2121},{"i":2782,"cid":"22DF0004","pid":"P00621097LZ","t":"Construction of Revetment along San Juan River, Brgy. Marulas, Kawit, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"KAWIT (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"HONEYVILLECONST AND DEVELOPMENT CORPORATION","c":43547280.0,"abc":43547280.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-30","lat":14.44825,"lon":120.91016,"sm":705,"fm":705,"tm":705,"am":705,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":19.24,"wp":[14.58887,121.01507],"wst":"matched","br":"Marulas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2122},{"i":2783,"cid":"24ED0036","pid":"P00825129LZ","t":"Construction of Puerto Galera Urban Drainage System, Brgy. San Isidro, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PUERTO GALERA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)","c":53074970.85,"abc":54450000.0,"fy":"2024","sd":"02/08/2024","cd":"2025-04-02","lat":13.505833,"lon":120.910278,"sm":1179,"fm":1179,"tm":null,"am":1179,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2123},{"i":2784,"cid":"23CC0296","pid":"P00727280LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Sabang Baliuag, Bulacan (K000+871 to K001+171)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":72373243.31,"abc":72374988.4,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.96288,"lon":120.910415,"sm":136,"fm":136,"tm":248,"am":136,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.48,"wp":[14.95872,120.91163],"wst":"matched","br":"Sabang Baliuag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.83,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 16 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":496},{"i":2785,"cid":"24CD0033","pid":"P00838341LZ","t":"Construction of Flood Control Structure along Bocaue - Santa Maria River, Sta. 02+050 - Sta. 02+200, Brgy. Ubihan, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499973.82,"abc":97999204.42,"fy":"2024","sd":"02/22/2024","cd":"2024-12-28","lat":14.756227,"lon":120.910546,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.72,"wp":[14.7735,120.92851],"wst":"matched","br":"Ubihan","len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2124},{"i":2786,"cid":"23CD0031","pid":"P00726731LZ","t":"Construction of Flood Control Structure along Meycauayan River, Sta. 2 + 337 - Sta. 2 + 387, Obando, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":28419783.13,"abc":28418777.98,"fy":"2023","sd":"02/27/2023","cd":"2023-07-27","lat":14.746626,"lon":120.910715,"sm":1032,"fm":1032,"tm":1032,"am":1032,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.08,"wp":[14.7473,120.91091],"wst":"matched","br":null,"len":50.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2125},{"i":2787,"cid":"24CD0032","pid":"P00838340LZ","t":"Construction of Flood Control Structure along Bocaue - Santa Maria River, Sta. 01+900 - Sta. 02+050, Brgy. Ubihan, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499880.38,"abc":97999751.16,"fy":"2024","sd":"02/14/2024","cd":"2024-12-20","lat":14.754325,"lon":120.911242,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.82,"wp":[14.7735,120.92851],"wst":"matched","br":"Ubihan","len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2126},{"i":2788,"cid":"23CD0070","pid":"P00725715LZ","t":"Construction of Flood control Structure along Bocaue - Santa Maria River, Ubihan Section, Meycauayan Side, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499601.54,"abc":96498946.24,"fy":"2023","sd":"02/27/2023","cd":"2024-01-22","lat":14.752986,"lon":120.911282,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.93,"wp":[14.7735,120.92851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2127},{"i":2789,"cid":"22CF0042","pid":"P00620840LZ","t":"Construction of Pampanga River Control, Sta. 0+000 - Sta. 0+520, Brgy. San Anton, San Leonardo, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN LEONARDO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":74428469.97,"abc":74427940.69,"fy":"2022","sd":"03/02/2022","cd":"2022-11-27","lat":15.34076,"lon":120.911826,"sm":1316,"fm":1316,"tm":1316,"am":659,"md":0.08,"ls":"boundary","ww":"Pampanga","wn":"Pampanga River","wd":0.07,"wp":[15.34138,120.91162],"wst":"matched","br":"San Anton","len":520.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2128},{"i":2790,"cid":"24CC0420","pid":"P00839576LZ","t":"Construction of Drainage Canal, Barangay Poblacion, Bustos, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"PLL BUILDERS INC.","c":9899242.37,"abc":9899302.8,"fy":"2024","sd":"04/25/2024","cd":"2024-08-08","lat":14.955619,"lon":120.912187,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2129},{"i":2791,"cid":"23CG0072","pid":"P00726910LZ","t":"Construction of Slope Protection Works at Maasim River, Phase I (Tributary Of Pampanga River) barangay Pulong Gubat, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"NES-SAN BUILDERS","c":70203652.16,"abc":72375000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-05-23","lat":15.046275,"lon":120.912244,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.02,"wp":[15.04615,120.91218],"wst":"matched","br":"Pulong Gubat","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2130},{"i":2792,"cid":"23C00160","pid":"P00726889LZ","t":"Construction of Slope Protection Works at Malasik River (Magumbali Section) Barangay Magumbali, Candaba, Pampanga","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":144750000.0,"abc":144749318.9,"fy":"2023","sd":"08/21/2023","cd":"2024-05-16","lat":15.126251,"lon":120.912404,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Malasik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magumbali","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2131},{"i":2793,"cid":"23DE0058","pid":"P00725778LZ","t":"Construction of Flood Mitigation Structure (Seawall), Brgy. Balite, San Luis, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-14","lat":13.82632,"lon":120.91244,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2132},{"i":2794,"cid":"24CD0047","pid":"P00820247LZ","t":"Construction of Road Dike, Sta. 00+000 - Sta. 00+134, Obando Section, Bulacan","w":"Construction of Dike","rg":"Region III","pv":"BULACAN","mu":"OBANDO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":144749396.6,"abc":144749833.4,"fy":"2024","sd":"02/22/2024","cd":"2024-09-11","lat":14.742201,"lon":120.912474,"sm":1032,"fm":1032,"tm":248,"am":1032,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":134.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2133},{"i":2795,"cid":"24CE0168","pid":"P00823428LZ","t":"Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Pag-asa, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":71651197.07,"abc":72375000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-08-12","lat":15.58718,"lon":120.912613,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.5875,120.91255],"wst":"matched","br":"Pag-asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2134},{"i":2796,"cid":"23DB0092","pid":"P00727310LZ","t":"Construction of Riverbank Protection along Pansipit River, Taal, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TAAL (BATANGAS)","deo":"Batangas 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"05/24/2023","cd":"2024-03-04","lat":13.898985,"lon":120.913308,"sm":1500,"fm":1500,"tm":1500,"am":1500,"md":0.0,"ls":"inside","ww":"Pansipit","wn":"Pansipit River","wd":0.0,"wp":[13.899,120.91327],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2135},{"i":2797,"cid":"22CC0157","pid":"P00631177LZ","t":"Construction of Flood Control Structure along Angat River (Sta. 0+ 672 - Sta. 1 + 007), Poblacion and Sabang Section, Bustos and Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":45079980.9,"abc":45079929.58,"fy":"2022","sd":"04/01/2022","cd":"2022-10-27","lat":14.963611,"lon":120.913333,"sm":265,"fm":265,"tm":248,"am":136,"md":0.23,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.55,"wp":[14.95873,120.91249],"wst":"matched","br":null,"len":335.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.98,"text":"The record contradicts itself: the municipality field and the pin point to Bustos, Bulacan, but the title names Bulacan, Bulacan, 16 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":560},{"i":2798,"cid":"24CE0259","pid":"P00823472LZ","t":"Construction of Flood Control Structure along Dibabuyan River, Barangay Mabini, Santo Domingo, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SANTO DOMINGO (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":47767129.0,"abc":48250000.0,"fy":"2024","sd":"05/08/2024","cd":"2024-12-03","lat":15.670402,"lon":120.913462,"sm":1410,"fm":1410,"tm":1410,"am":1410,"md":0.0,"ls":"inside","ww":"Dibabuyan","wn":"Dibabuyan Creek","wd":1.53,"wp":[15.66557,120.90013],"wst":"matched","br":"Mabini","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2136},{"i":2799,"cid":"23DF0049","pid":"P00742170LZ","t":"Construction of Revetment along Ilang-ilang River, Barangay Malagasang, Imus, Cavite, (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"IMUS CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"OMNICON BUILDERS","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-02-19","lat":14.374167,"lon":120.913889,"sm":638,"fm":638,"tm":360,"am":638,"md":0.0,"ls":"inside","ww":"Ilang-ilang","wn":"Alang-Ilang","wd":3.64,"wp":[14.36341,120.882],"wst":"matched","br":"Malagasang","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.36,"text":"The record contradicts itself: the municipality field and the pin point to Imus City, Cavite, but the title names Cavite City, Cavite, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":430},{"i":2800,"cid":"24CC0158","pid":"P00845976LZ","t":"Construction of River Protection Structure, Barangay Sta. Cruz, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":39599067.05,"abc":39599692.14,"fy":"2024","sd":"02/28/2024","cd":"2024-08-14","lat":14.8472,"lon":120.872996,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2137},{"i":2801,"cid":"24CC0053","pid":"P00838408LZ","t":"Construction of Riverbank Protection Structure at Barangay Pritil, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96499556.14,"abc":96499938.94,"fy":"2024","sd":"02/07/2024","cd":"2024-08-28","lat":14.854541,"lon":120.873276,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pritil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2138},{"i":2802,"cid":"22AI0066","pid":"P00620463LZ","t":"Construction of Flood Control Structure along Banila River, Diket - Don Justo Abalos, Umingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"RS RODRIGUEZ CONSTRUCTION & SUPPLIES","c":29157900.26,"abc":29400000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-11-08","lat":15.9281,"lon":120.87333,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.03,"wp":[15.92836,120.87343],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2139},{"i":2803,"cid":"22DF0065","pid":"P00620232LZ","t":"Construction of Revetment along Manila Bay, Brgy. San Salcedo, Noveleta, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":89745000.0,"abc":89745000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-01-19","lat":14.427875,"lon":120.873425,"sm":1026,"fm":1026,"tm":1026,"am":1026,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Salcedo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2140},{"i":2804,"cid":"23CC0387","pid":"P00742141LZ","t":"Construction of River Protection Structure and Rehabilitation of Waterways along Guiguinto River Brgy. Sta. Cruz Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":74248853.83,"abc":74249628.75,"fy":"2023","sd":"04/03/2023","cd":"2023-12-04","lat":14.836629,"lon":120.873477,"sm":597,"fm":597,"tm":248,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.01,"wp":[14.83666,120.87358],"wst":"matched","br":"Sta. Cruz Guiguinto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2141},{"i":2805,"cid":"24CC0039","pid":"P00838401LZ","t":"Construction of Riverbank Protection Structure at Barangay Malis, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499176.96,"abc":96499852.85,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.84673,"lon":120.87386,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malis","len":null,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2817,2819,2820,2822,2845,2875],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":958},{"i":2806,"cid":"24CC0150","pid":"P00845799LZ","t":"Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Sta. Cruz, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98998914.62,"abc":98999209.09,"fy":"2024","sd":"04/23/2024","cd":"2025-01-08","lat":14.84624,"lon":120.874155,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2142},{"i":2807,"cid":"22DF0026","pid":"P00620565LZ","t":"Construction of Revetment along Cañas River, Brgy. Bunga, Phase II, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-12","lat":14.365265,"lon":120.874438,"sm":1548,"fm":1548,"tm":1548,"am":1548,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.0,"wp":[14.36525,120.87447],"wst":"matched","br":"Bunga","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2143},{"i":2808,"cid":"24CC0329","pid":"P00844499LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Maysantol, Bulakan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":77199800.47,"abc":77199815.96,"fy":"2024","sd":"04/18/2024","cd":"2024-12-13","lat":14.799967,"lon":120.874539,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maysantol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2144},{"i":2809,"cid":"24CC0463","pid":"P00839575LZ","t":"Construction of Drainage Canal, Barangay Parulan, Plaridel, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":4949713.95,"abc":4949973.65,"fy":"2024","sd":"05/28/2024","cd":"2024-09-24","lat":14.891516,"lon":120.874551,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Parulan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2145},{"i":2810,"cid":"22CC0144","pid":"P00631218LZ","t":"Rehabilitation of River Control Structures, Malis (Bagbag Creek), Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079969.53,"abc":45079393.62,"fy":"2022","sd":"03/04/2022","cd":"2022-11-21","lat":14.838636,"lon":120.874573,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":12.83,"wp":[14.90292,120.77539],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2146},{"i":2811,"cid":"23CG0073","pid":"P00726912LZ","t":"Construction of Flood Mitigation Structure Improvement and Construction of Concrete Slope Protection work at Maasim River, Phase I, barangay Bahay Pare, Candaba, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68321524.36,"abc":72375000.0,"fy":"2023","sd":"04/06/2023","cd":"2024-01-11","lat":15.03409,"lon":120.87465,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.02,"wp":[15.03392,120.87457],"wst":"matched","br":"Bahay Pare","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2147},{"i":2812,"cid":"22DF0025","pid":"P00620564LZ","t":"Construction of Revetment along Cañas River, Brgy Luciano, Trece Martires City, Phase 3, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TRECE MARTIRES CITY (CAPITAL) (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48999982.61,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-22","lat":14.26959,"lon":120.8749,"sm":1583,"fm":1583,"tm":1583,"am":1583,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.0,"wp":[14.26961,120.87493],"wst":"matched","br":"Luciano","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2148},{"i":2813,"cid":"24CC0083","pid":"P00821262LZ","t":"Construction of Riverbank Protection Structure along Angat River (Phase II), Barangay Parulan, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":72374885.43,"abc":72374930.84,"fy":"2024","sd":"02/07/2024","cd":"2024-10-03","lat":14.891714,"lon":120.874982,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.89208,120.87498],"wst":"matched","br":"Parulan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2149},{"i":2814,"cid":"23DF0017","pid":"P00727158LZ","t":"Construction of Revetment along Cañas River, Barangay Santol, Phase III, Tanza, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"TANZA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"N.B. AVILA CONSTRUCTION","c":48465438.33,"abc":49000000.0,"fy":"2023","sd":"09/07/2023","cd":"2024-03-19","lat":14.178867,"lon":120.87515,"sm":1548,"fm":1548,"tm":1548,"am":641,"md":12.86,"ls":"outside","ww":"Cañas","wn":"Cañas River","wd":4.02,"wp":[14.20781,120.89765],"wst":"matched","br":"Santol","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":62,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.86,"text":"The pin is 12.9 km outside Tanza, Cavite, the nearest municipality the record claims. It falls in Indang, Cavite.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":4.02,"text":"The title names Cañas, which OpenStreetMap maps through the stated municipality, but the pin is 4.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":84},{"i":2815,"cid":"23CC0031","pid":"P00736617LZ","t":"Construction of Flood Mitigation Structures along Barangay Santo Cristo, Pulilan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PULILAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":48999986.25,"abc":48999799.64,"fy":"2023","sd":"02/06/2023","cd":"2023-07-11","lat":14.892607,"lon":120.875185,"sm":1182,"fm":1182,"tm":1182,"am":1182,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Cristo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2150},{"i":2816,"cid":"23CC0058","pid":"P00736011LZ","t":"Construction of Concrete Slope Protection at Barangay Hinukay, K004 + 100 - K004 + 300, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":38599762.52,"abc":38599729.27,"fy":"2023","sd":"02/13/2023","cd":"2023-08-17","lat":15.009252,"lon":120.875385,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":null,"ph":null,"dup":[],"run":[],"cl":[2846,2847,2855,2857,2859,2873,2892],"L":"field","s":17,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1113},{"i":2817,"cid":"22CC0096","pid":"P00631211LZ","t":"Construction of Slope Protection Structures at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":45079451.15,"abc":45079314.63,"fy":"2022","sd":"01/28/2022","cd":"2022-10-24","lat":14.839879,"lon":120.875544,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.19,"wp":[14.8384,120.8746],"wst":"matched","br":"Malis","len":780.0,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2819,2820,2822,2845,2875],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1071},{"i":2818,"cid":"22PI0050","pid":"P00620804LZ","t":"Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BAUKO (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":96500000.0,"abc":96499997.0,"fy":"2022","sd":"03/01/2022","cd":"2022-10-06","lat":16.99694,"lon":120.87555,"sm":189,"fm":189,"tm":189,"am":189,"md":0.0,"ls":"inside","ww":"Bayudan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":680.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2151},{"i":2819,"cid":"22CC0095","pid":"P00631188LZ","t":"Construction of Flood Control Structure at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":45079500.38,"abc":45079553.36,"fy":"2022","sd":"01/28/2022","cd":"2022-10-24","lat":14.845163,"lon":120.875587,"sm":597,"fm":597,"tm":null,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.42,"wp":[14.84764,120.87857],"wst":"matched","br":"Malis","len":780.0,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2817,2820,2822,2845,2875],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1072},{"i":2820,"cid":"23CC0099","pid":"P00726475LZ","t":"Construction of River Control Project along Guiguinto River, Barangay Malis, Sta. 02+250 - Sta. 02+610, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499623.93,"abc":96499368.08,"fy":"2023","sd":"02/13/2023","cd":"2023-11-30","lat":14.836925,"lon":120.875628,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.02,"wp":[14.83675,120.8757],"wst":"matched","br":"Malis","len":360.0,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2817,2819,2822,2845,2875],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":959},{"i":2821,"cid":"22PE0007","pid":"P00621000LZ","t":"Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 20 (Ekip), Bokod, Benguet","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BOKOD (BENGUET)","deo":"Benguet 1st District Engineering Office","co":"CLIFF CONSTRUCTION & AGGREGATES","c":23765066.81,"abc":24500000.0,"fy":"2022","sd":"05/10/2022","cd":"2022-11-11","lat":16.523554,"lon":120.875651,"sm":217,"fm":217,"tm":217,"am":217,"md":0.0,"ls":"inside","ww":"Agno","wn":"Agno River","wd":7.82,"wp":[16.57671,120.82744],"wst":"matched","br":null,"len":null,"ph":"Section 20","dup":[],"run":[2378,2536],"cl":[],"L":"records","s":51,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.65,"value":7.82,"text":"The title names Agno, which OpenStreetMap maps through the stated municipality, but the pin is 7.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22PE0007 to 22PE0009) cover the same site, together worth PHP 72,657,448.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":183},{"i":2822,"cid":"23CC0095","pid":"P00725752LZ","t":"Rehabilitation of Waterways and Construction of Water Pumping Station at Barangay Malis, Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":77682237.38,"abc":77682407.82,"fy":"2023","sd":"02/13/2023","cd":"2024-01-08","lat":14.837789,"lon":120.875783,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malis","len":null,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2817,2819,2820,2845,2875],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1019},{"i":2823,"cid":"23DF0080","pid":"P00744303LZ","t":"Rehabilitation of Revetment along Cañas River, Brgy. Pinagtipunan, General Trias City, Cavite, Sta. 0+000 to Sta. 0+200.","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":36537795.0,"abc":36537795.0,"fy":"2023","sd":"03/15/2023","cd":"2023-10-06","lat":14.375278,"lon":120.875833,"sm":387,"fm":387,"tm":360,"am":387,"md":0.0,"ls":"inside","ww":"Cañas","wn":"Cañas River","wd":0.01,"wp":[14.37528,120.87571],"wst":"matched","br":"Pinagtipunan","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.8,"text":"The record contradicts itself: the municipality field and the pin point to City of General Trias, Cavite, but the title names Cavite City, Cavite, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":561},{"i":2824,"cid":"23CC0210","pid":"P00740590LZ","t":"Construction of River Protection along Guiguinto River, K005 + 750 to K005 + 950, barangay Ilang-ilang, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":47039948.6,"abc":48999946.5,"fy":"2023","sd":"03/21/2023","cd":"2023-12-08","lat":14.825973,"lon":120.876296,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.01,"wp":[14.82595,120.87641],"wst":"matched","br":"Ilang-ilang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2152},{"i":2825,"cid":"23CC0104","pid":"P00725751LZ","t":"Rehabilitation of Waterways and Construction of Water Pumping Station at Barangay Poblacion, Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96495872.05,"abc":96499417.73,"fy":"2023","sd":"02/13/2023","cd":"2024-02-07","lat":14.824137,"lon":120.876396,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[2826],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 115,501,948.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":750},{"i":2826,"cid":"23CC0295","pid":"P00742317LZ","t":"Construction of Flood Control Structure and Rehabilitation of Waterways Along Guiginto River Brgy. Poblacion, Guiginto, Bulacan (PHASE II)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":19006075.94,"abc":19799983.14,"fy":"2023","sd":"03/27/2023","cd":"2023-10-02","lat":14.824137,"lon":120.876396,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Waterways Along Guiginto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":"Phase II","dup":[2825],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 115,501,948.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1020},{"i":2827,"cid":"23CG0089","pid":"P00726913LZ","t":"Construction of Flood Mitigation Structure Improvement and Construction of Concrete Slope Protection work at Maasim River, Phase II, barangay Bahay Pare, Candaba, Pampanga","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"PAMPANGA","mu":"CANDABA (PAMPANGA)","deo":"Pampanga 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":68321985.46,"abc":72375000.0,"fy":"2023","sd":"04/06/2023","cd":"2024-02-12","lat":15.033178,"lon":120.876453,"sm":318,"fm":318,"tm":318,"am":318,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":0.01,"wp":[15.0331,120.87641],"wst":"matched","br":"Bahay Pare","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2153},{"i":2828,"cid":"23CC0074","pid":"P00726473LZ","t":"Construction of River Control Project along Guiguinto River, Barangay Ilang-Ilang, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96405861.59,"abc":96499880.44,"fy":"2023","sd":"02/13/2023","cd":"2023-12-20","lat":14.823804,"lon":120.876465,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.02,"wp":[14.8239,120.87658],"wst":"matched","br":"Ilang-Ilang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2154},{"i":2829,"cid":"23DF0042","pid":"P00737502LZ","t":"Construction of Drainage System in Barangay Poblacion, Noveleta, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"NOVELETA (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4897878.72,"abc":4950000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-07-18","lat":14.422497,"lon":120.876475,"sm":1026,"fm":1026,"tm":1026,"am":1026,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2155},{"i":2830,"cid":"22CC0281","pid":"P00621450LZ","t":"Rehabilitation of Flood Structure along Barangay Pinagbarilan, Baliwag, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"I.F. CLEMENTE CONSTRUCTION CORPORATION","c":4899975.59,"abc":4899128.13,"fy":"2022","sd":"04/06/2022","cd":"2022-07-01","lat":14.96558,"lon":120.876562,"sm":136,"fm":136,"tm":248,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbarilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.71,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 16 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":623},{"i":2831,"cid":"23CC0212","pid":"P00740582LZ","t":"Construction of Flood Control Structure along Bagbag Creek, Barangay Sta. Cruz, Guiguinto, Bulacan (K003+772 to K003+922)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":48999246.3,"abc":48249917.79,"fy":"2023","sd":"03/21/2023","cd":"2023-12-06","lat":14.840689,"lon":120.876607,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":12.89,"wp":[14.90292,120.77539],"wst":"matched","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01553,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":677},{"i":2832,"cid":"23EB0087","pid":"P00742459LZ","t":"Construction of Debris Flow Barrier along Mindoro West Coastal Road (S00095MR), Sitio Turawan, Brgy. San Francisco, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":98999995.37,"abc":99000000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-05-04","lat":12.870993,"lon":120.87662,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2156},{"i":2833,"cid":"22CC0282","pid":"P00637069LZ","t":"Rehabilitation of Flood Control Structure along Barangay Pinagbarilan, Baliuag, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"I.F. CLEMENTE CONSTRUCTION CORPORATION","c":4899893.64,"abc":4899660.77,"fy":"2022","sd":"04/06/2022","cd":"2022-07-01","lat":14.960629,"lon":120.876641,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbarilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2157},{"i":2834,"cid":"23CC0041","pid":"P00737459LZ","t":"Construction of Flood Control Structure along Guiguinto River, Poblacion, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TIONGCO MENDOZA CONSTRUCTION CO. INC.","c":19799878.83,"abc":19799578.31,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.826494,"lon":120.876719,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.01,"wp":[14.82652,120.8766],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2158},{"i":2835,"cid":"22CC0158","pid":"P00631192LZ","t":"Construction of Flood Control Wall, Poblacion, Guiguinto, Bulacan, Sta. 0+157-Sta.0+301","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"F.R. MAPILISAN CONSTRUCTION","c":22539929.3,"abc":22539714.91,"fy":"2022","sd":"04/06/2022","cd":"2022-07-22","lat":14.82777,"lon":120.876935,"sm":597,"fm":597,"tm":248,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":144.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2159},{"i":2836,"cid":"23CC0038","pid":"P00737458LZ","t":"Construction of Flood Control Structure along Guiguinto River, Ilang-ilang Section, Ilang-ilang, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ROSSLANCE CONSTRUCTION AND DEVELOPMENT","c":19798773.41,"abc":19799097.14,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.823446,"lon":120.876935,"sm":597,"fm":597,"tm":597,"am":248,"md":0.02,"ls":"boundary","ww":"Guiguinto","wn":"Guiguinto River","wd":0.01,"wp":[14.82353,120.877],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2160},{"i":2837,"cid":"24CC0170","pid":"P00843310LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 3 to Purok 5), Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":77199677.98,"abc":77199942.32,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":15.000814,"lon":120.877031,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2840,2848,2850,2852,2880,2883,2897],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":960},{"i":2838,"cid":"24CC0164","pid":"P00823459LZ","t":"Construction of River Control Structure at Barangay Poblacion Purok 1 Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":77198841.0,"abc":77199485.73,"fy":"2024","sd":"02/28/2024","cd":"2024-10-27","lat":14.826984,"lon":120.87704,"sm":597,"fm":597,"tm":248,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Purok 1 Guiguinto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2161},{"i":2839,"cid":"24CC0051","pid":"P00820229LZ","t":"Construction of Flood Control Structure, Barangay Santa Cruz, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":72374267.49,"abc":72374968.39,"fy":"2024","sd":"02/07/2024","cd":"2024-06-19","lat":14.844018,"lon":120.877052,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2162},{"i":2840,"cid":"24CC0093","pid":"P00838366LZ","t":"Construction of Reinforced Concrete Slope Revetment at Barangay San Roque, Baliuag, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC. / C.T. LEONCIO CONSTRUCTION & TRADING","c":72374803.73,"abc":72374977.69,"fy":"2024","sd":"03/20/2024","cd":"2024-11-14","lat":14.999346,"lon":120.877172,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2837,2848,2850,2852,2880,2883,2897],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":988},{"i":2841,"cid":"23EB0035","pid":"P00726767LZ","t":"Construction of Flood Control Structure along Amnay River, Kabangkalan Section, Sta. 0+000 - Sta. 0+449, Sablayan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"STX ENTERPRISES","c":45073624.75,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-09-02","lat":12.956448,"lon":120.877556,"sm":1228,"fm":1228,"tm":1228,"am":1228,"md":0.0,"ls":"inside","ww":"Amnay","wn":"Amnay River","wd":0.43,"wp":[12.95282,120.87617],"wst":"matched","br":null,"len":449.0,"ph":null,"dup":[],"run":[2057,2058,2523],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23EB0032 to 23EB0035) cover the same site, together worth PHP 178,999,585.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":581},{"i":2842,"cid":"24CC0142","pid":"P00823467LZ","t":"Construction of Flood Control Structure along Guiguinto River, Malis Section, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499968.29,"abc":96499971.1,"fy":"2024","sd":"03/20/2024","cd":"2024-06-11","lat":14.832546,"lon":120.877677,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.03,"wp":[14.83224,120.87762],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2163},{"i":2843,"cid":"22CC0145","pid":"P00631219LZ","t":"Rehabilitation of River Control Structures, Sta. Cruz (Bagbag Creek), Guiguinto, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079969.52,"abc":45079769.3,"fy":"2022","sd":"03/04/2022","cd":"2022-11-21","lat":14.842623,"lon":120.877747,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":12.88,"wp":[14.90292,120.77539],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2164},{"i":2844,"cid":"24CC0423","pid":"P00821224LZ","t":"Construction of Flood Control Structure along Angat River, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499757.73,"abc":96499927.72,"fy":"2024","sd":"05/14/2024","cd":"2025-02-07","lat":14.89835,"lon":120.877844,"sm":136,"fm":136,"tm":248,"am":1152,"md":1.66,"ls":"adjacent","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.89859,120.87731],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2614,2368],"cl":[],"L":"records","s":57,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.27,"text":"The record contradicts itself: the municipality field and the pin point to Baliuag, Bulacan, but the title names Bulacan, Bulacan, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0421 to 24CC0423) cover the same site, together worth PHP 250,899,023.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":126},{"i":2845,"cid":"23CC0214","pid":"P00740347LZ","t":"Construction of Flood Control Structure along Bagbag Creek, Barangay Malis, Guiguinto, Bulacan (K004+300 to K004+500)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":72373409.11,"abc":72374068.34,"fy":"2023","sd":"03/28/2023","cd":"2024-01-21","lat":14.842727,"lon":120.877881,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Bagbag","wn":"Bagbag River","wd":12.89,"wp":[14.90292,120.77539],"wst":"matched","br":"Malis","len":null,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2817,2819,2820,2822,2875],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1021},{"i":2846,"cid":"23CC0133","pid":"P00725685LZ","t":"Construction of Revetment Wall at Barangay Hinukay, Sta. 02+780 to Sta. 03+180, Baliuag, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":96499701.59,"abc":96499834.19,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":15.01071,"lon":120.877924,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":400.0,"ph":null,"dup":[],"run":[2847,2873],"cl":[2816,2847,2855,2857,2859,2873,2892],"L":"field","s":53,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0132 to 23CC0134) cover the same site, together worth PHP 289,495,732.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":83},{"i":2847,"cid":"23CC0132","pid":"P00726461LZ","t":"Construction of River Control Project at Barangay Hinukay, Sta. 01+960 to Sta. 02+360, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96498523.97,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":15.007383,"lon":120.878228,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":400.0,"ph":null,"dup":[],"run":[2846,2873],"cl":[2816,2846,2855,2857,2859,2873,2892],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0132 to 23CC0134) cover the same site, together worth PHP 289,495,732.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":90},{"i":2848,"cid":"24CC0167","pid":"P00843309LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 1 to Purok 3), Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":77199531.57,"abc":77199943.4,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":15.00143,"lon":120.878387,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2837,2840,2850,2852,2880,2883,2897],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":961},{"i":2849,"cid":"22CC0039","pid":"P00631204LZ","t":"Construction of River Protection, Balubad, Bulacan, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":35278599.12,"abc":35279964.6,"fy":"2022","sd":"01/28/2022","cd":"2022-07-26","lat":14.805831,"lon":120.878454,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2165},{"i":2850,"cid":"24CC0023","pid":"P00838371LZ","t":"Construction of Riverbank Protection Structure (Phase II) at Barangay San Roque, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499563.2,"abc":96499972.98,"fy":"2024","sd":"02/07/2024","cd":"2024-11-01","lat":14.999615,"lon":120.878479,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":"Phase II","dup":[],"run":[2897,2168],"cl":[2168,2265,2837,2840,2848,2852,2880,2883,2897],"L":"field","s":54,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0023 to 24CC0025) cover the same site, together worth PHP 265,373,515.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":79},{"i":2851,"cid":"22CC0191","pid":"P00621531LZ","t":"Construction of Flood Control Structures along Guiguinto River Sta. 01+840 to Sta. 02+040 Malis Section, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"NICLEDON CONSTRUCTION","c":24497106.55,"abc":24499916.34,"fy":"2022","sd":"04/05/2022","cd":"2022-12-27","lat":14.847557,"lon":120.878555,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.01,"wp":[14.84763,120.87859],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2166},{"i":2852,"cid":"23CC0255","pid":"P00740338LZ","t":"Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+300 to K001+600)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS / DRJY CONSTRUCTION","c":72373859.53,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-22","lat":15.001371,"lon":120.878657,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2837,2840,2848,2850,2880,2883,2897],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":989},{"i":2853,"cid":"24CC0069","pid":"P00820820LZ","t":"Construction of Flood Mitigation Structure and Improvement of Waterways along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":28949821.9,"abc":28949908.16,"fy":"2024","sd":"03/20/2024","cd":"2024-10-15","lat":14.850212,"lon":120.878913,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.02,"wp":[14.85017,120.87911],"wst":"matched","br":"Daungan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2167},{"i":2854,"cid":"24CC0082","pid":"P00821269LZ","t":"Construction of Riverbank Protection Structure along Angat River, Barangay Parulan, Plaridel, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":72374479.88,"abc":72374950.84,"fy":"2024","sd":"02/07/2024","cd":"2024-08-07","lat":14.898648,"lon":120.879097,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.12,"wp":[14.8995,120.87842],"wst":"matched","br":"Parulan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2168},{"i":2855,"cid":"23CC0256","pid":"P00740332LZ","t":"Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":72374165.79,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-22","lat":15.006094,"lon":120.879329,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":null,"ph":null,"dup":[],"run":[],"cl":[2816,2846,2847,2857,2859,2873,2892],"L":"field","s":20,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1050},{"i":2856,"cid":"24CC0045","pid":"P00838370LZ","t":"Construction of Riverbank Protection Structure (Phase II) at Barangay Piel, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499605.71,"abc":96499850.14,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":14.990727,"lon":120.879337,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[2105,2256,2336,2630,2860,2861,2874,2881,2890,2893],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":875},{"i":2857,"cid":"23CC0257","pid":"P00726901LZ","t":"Construction of Flood Control System at Barangay Hinukay, Baliuag, Bulacan (Sta. 04+320 to Sta. 04+580)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77198159.93,"abc":77199405.85,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":15.006087,"lon":120.879378,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":260.0,"ph":null,"dup":[],"run":[],"cl":[2816,2846,2847,2855,2859,2873,2892],"L":"field","s":20,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1051},{"i":2858,"cid":"22DF0386","pid":"P00644740LZ","t":"Reconstruction/ Rehabilitation of Revetment along Ilang- Ilang River, Brgy. Prinza, General Trias City, Cavite","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":9891250.0,"abc":9891250.0,"fy":"2022","sd":"01/09/2023","cd":"2023-03-08","lat":14.378721,"lon":120.879418,"sm":387,"fm":387,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":1.33,"wp":[14.36675,120.88075],"wst":"matched","br":"Prinza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2169},{"i":2859,"cid":"22CC0168","pid":"P00639467LZ","t":"Construction of Flood Control Structure and Improvement of Waterways at Brgy. Hinukay, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999840.49,"abc":48999366.39,"fy":"2022","sd":"04/05/2022","cd":"2022-12-07","lat":15.00621,"lon":120.87946,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":null,"ph":null,"dup":[],"run":[],"cl":[2816,2846,2847,2855,2857,2873,2892],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1073},{"i":2860,"cid":"24CC0169","pid":"P00843308LZ","t":"Construction of Reinforced Concrete Flood Control Structure at Barangay Piel (Purok 3 to Purok 5), Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":77199743.94,"abc":77199945.99,"fy":"2024","sd":"02/28/2024","cd":"2024-10-24","lat":14.989359,"lon":120.87947,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2861,2874,2881,2890,2893],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":910},{"i":2861,"cid":"24CC0088","pid":"P00838365LZ","t":"Construction of Reinforced Concrete Slope Revetment at Barangay Piel, Baliuag, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"S-ANG CONSTRUCTION & GENERAL TRADING, INC. / C.T. LEONCIO CONSTRUCTION & TRADING","c":72374906.25,"abc":72374987.18,"fy":"2024","sd":"03/20/2024","cd":"2024-11-14","lat":14.990847,"lon":120.879472,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2860,2874,2881,2890,2893],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":911},{"i":2862,"cid":"23CC0138","pid":"P00735981LZ","t":"Construction of Flood Mitigation Structures along Barangay San Francisco, Bulacan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77188463.69,"abc":77199901.56,"fy":"2023","sd":"02/13/2023","cd":"2023-12-06","lat":14.809188,"lon":120.879497,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2170},{"i":2863,"cid":"23CC0061","pid":"P00726161LZ","t":"Construction of Slope Protection at Hinukay, Sta. 00 + 150 to Sta. 00 + 350, Baliuag, Bulacan,","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / GDL CONSTRUCTION","c":48999313.96,"abc":48999447.47,"fy":"2023","sd":"02/06/2023","cd":"2023-07-20","lat":15.006134,"lon":120.879542,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2171},{"i":2864,"cid":"24CC0054","pid":"P00839480LZ","t":"Construction of Slope Protection Structure and Waterways, Barangay Daungan, Guiguinto, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":69299988.21,"abc":69299906.7,"fy":"2024","sd":"03/20/2024","cd":"2024-10-14","lat":14.850763,"lon":120.879572,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daungan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2172},{"i":2865,"cid":"22DF0042","pid":"P00620229LZ","t":"Construction of Revetment along Manila Bay, Barangay #8, Dalahican, Cavite City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CAVITE CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"R.V. RIETA TRADING & GENERAL CONSTRUCTION / ALMAKAR BUILDERS & METAL WORKS","c":48577570.41,"abc":51145000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-12-09","lat":14.46058,"lon":120.87961,"sm":360,"fm":360,"tm":360,"am":360,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"#8","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2173},{"i":2866,"cid":"24PI0001","pid":"P00821542LZ","t":"Construction of Kawayan-Kamiling-Padang Otucan Norte Flood Control along Bayudan-Chico River, Bauko, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BAUKO (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / LOG-AKA CONSTRUCTION","c":39200000.0,"abc":39199997.7,"fy":"2024","sd":"02/18/2024","cd":"2024-08-12","lat":17.00742,"lon":120.87965,"sm":189,"fm":189,"tm":189,"am":189,"md":0.0,"ls":"inside","ww":"Bayudan-Chico","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2174},{"i":2867,"cid":"23DF0076","pid":"P00744302LZ","t":"Rehabilitation of Revetment along Ilang-Ilang River, Brgy. Prinza, General Trias City, Cavite, Sta. 0+000 to Sta. 0+050.","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF GENERAL TRIAS (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":8899230.0,"abc":8899230.0,"fy":"2023","sd":"03/15/2023","cd":"2023-05-22","lat":14.379444,"lon":120.879722,"sm":387,"fm":387,"tm":360,"am":387,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Alang-Ilang","wd":1.41,"wp":[14.36675,120.88075],"wst":"matched","br":"Prinza","len":50.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.3,"text":"The record contradicts itself: the municipality field and the pin point to City of General Trias, Cavite, but the title names Cavite City, Cavite, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":624},{"i":2868,"cid":"23CC0136","pid":"P00735978LZ","t":"Construction of Flood Mitigation Structures along Barangay Balubad, Bulacan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":77198713.48,"abc":77199910.6,"fy":"2023","sd":"02/13/2023","cd":"2023-10-11","lat":14.810028,"lon":120.879749,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balubad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2175},{"i":2869,"cid":"24CC0425","pid":"P00844502LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay San Francisco, Bulakan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":77012853.59,"abc":77198999.21,"fy":"2024","sd":"05/14/2024","cd":"2024-12-18","lat":14.810067,"lon":120.879779,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2176},{"i":2870,"cid":"24CC0327","pid":"P00843314LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Bagumbayan, Bulakan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":72374225.99,"abc":72374781.59,"fy":"2024","sd":"04/18/2024","cd":"2024-09-23","lat":14.794038,"lon":120.879791,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2177},{"i":2871,"cid":"21DF0189","pid":"P00561183LZ","t":"Construction/Rehabilitation of Drainage, Brgy. Pinagtipunan, General Trias, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"City of General Trias","deo":"Cavite 1st District Engineering Office","co":"FE S. REYES GENERAL CONTRACTOR CORP.","c":3718753.56,"abc":3920000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-08-15","lat":14.374031,"lon":120.880067,"sm":387,"fm":null,"tm":387,"am":387,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagtipunan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2178},{"i":2872,"cid":"24CC0273","pid":"P00823364LZ","t":"Construction/improvement of Flood Mitigation Structure at Matungao,Bulakan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":77188821.56,"abc":77199977.4,"fy":"2024","sd":"04/02/2024","cd":"2024-11-27","lat":14.812,"lon":120.880106,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2179},{"i":2873,"cid":"23CC0134","pid":"P00726468LZ","t":"Construction of Riverwall at Barangay Hinukay, Sta. 02+370 to Sta. 02+770, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96497506.9,"abc":96499679.61,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":15.010087,"lon":120.880167,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":400.0,"ph":null,"dup":[],"run":[2847,2846],"cl":[2816,2846,2847,2855,2857,2859,2892],"L":"field","s":52,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CC0132 to 23CC0134) cover the same site, together worth PHP 289,495,732.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":91},{"i":2874,"cid":"23CC0269","pid":"P00726903LZ","t":"Construction of Flood Control System at Barangay Piel, Baliuag, Bulacan (Sta. 03+480 to Sta. 03+740)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"MICHARIAN BUILDERS AND TRADING","c":77199243.03,"abc":77199958.41,"fy":"2023","sd":"03/14/2023","cd":"2023-12-04","lat":14.98278,"lon":120.880186,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":260.0,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2860,2861,2881,2890,2893],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":912},{"i":2875,"cid":"24CC0157","pid":"P00845983LZ","t":"Construction of Waterways and Flood Control Structure along Guiguinto River, Brgy. Malis, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"RJR CALCON CORP.","c":29699463.05,"abc":29699367.93,"fy":"2024","sd":"03/01/2024","cd":"2024-06-25","lat":14.84621,"lon":120.88025,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.02,"wp":[14.84603,120.88017],"wst":"matched","br":"Malis","len":null,"ph":null,"dup":[],"run":[],"cl":[2096,2101,2805,2817,2819,2820,2822,2845],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Malis (2022 to 2024), totalling PHP 621,312,440.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1099},{"i":2876,"cid":"22CC0143","pid":"P00621076LZ","t":"Rehabilitation of Flood Control Structure along Angat River, Parulan Section, Sta. 0 + 000 to Sta. 0 + 353.60, Plaridel, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":48998995.93,"abc":48999497.5,"fy":"2022","sd":"02/18/2022","cd":"2023-05-13","lat":14.901119,"lon":120.880353,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90123,120.88],"wst":"matched","br":null,"len":353.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2180},{"i":2877,"cid":"23CC0125","pid":"P00735977LZ","t":"Construction of Flood Mitigation Structures along Barangay Bagumbayan, Bulacan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199971.28,"abc":77199879.31,"fy":"2023","sd":"02/13/2023","cd":"2023-08-16","lat":14.791176,"lon":120.880416,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2181},{"i":2878,"cid":"24CC0263","pid":"P00843322LZ","t":"Construction of Reinforced Concrete Flood Control Structure, Barangay Matungao, Bulakan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":72374967.11,"abc":72374824.47,"fy":"2024","sd":"04/02/2024","cd":"2024-11-27","lat":14.81319,"lon":120.880523,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matungao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2182},{"i":2879,"cid":"22CC0258","pid":"P00640519LZ","t":"Construction of Flood Control Structure, Brgy. Tangos, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":49499816.61,"abc":49499297.47,"fy":"2022","sd":"04/04/2022","cd":"2023-01-28","lat":14.979714,"lon":120.880638,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2183},{"i":2880,"cid":"23CC0282","pid":"P00740339LZ","t":"Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+600 to K001+900)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":72373832.51,"abc":72374797.38,"fy":"2023","sd":"03/28/2023","cd":"2023-12-18","lat":15.002379,"lon":120.880638,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2837,2840,2848,2850,2852,2883,2897],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":990},{"i":2881,"cid":"22CC0234","pid":"P00621535LZ","t":"Construction of Flood Control Structure, Sta. 01 + 120 - Sta. 01 + 270, Brgy. Piel, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":25479994.08,"abc":25479931.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-31","lat":14.979697,"lon":120.880662,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":150.0,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2860,2861,2874,2890,2893],"L":"field","s":20,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1052},{"i":2882,"cid":"23CC0369","pid":"P00740345LZ","t":"Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan (K000+972.20 to K001+183.4)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING / I.F. CLEMENTE CONSTRUCTION CORPORATION","c":72374590.56,"abc":72374734.39,"fy":"2023","sd":"04/03/2023","cd":"2023-10-10","lat":14.979595,"lon":120.880675,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tilapayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2184},{"i":2883,"cid":"23CC0254","pid":"P00740337LZ","t":"Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+062 to K001+362)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":72372354.56,"abc":72374734.39,"fy":"2023","sd":"03/28/2023","cd":"2023-12-19","lat":15.00231,"lon":120.88069,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[2168,2265,2837,2840,2848,2850,2852,2880,2897],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":991},{"i":2884,"cid":"23CC0370","pid":"P00740344LZ","t":"Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan (K000+761 to K000+972.2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":72374585.24,"abc":72374734.39,"fy":"2023","sd":"04/03/2023","cd":"2023-11-09","lat":14.979651,"lon":120.880713,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tilapayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2185},{"i":2885,"cid":"23CC0055","pid":"P00726722LZ","t":"Construction of Flood Control Structure along Angat River at Parulan Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"S.A. PLEYTO CONSTRUCTION CORPORATION","c":22784932.19,"abc":22784118.04,"fy":"2023","sd":"02/06/2023","cd":"2023-04-13","lat":14.901158,"lon":120.880735,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.90137,120.88005],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[2601,2572,2079],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23CC0052 to 23CC0055) cover the same site, together worth PHP 150,182,208.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":648},{"i":2886,"cid":"23CC0124","pid":"P00735980LZ","t":"Construction of Flood Mitigation Structures along Barangay Matungao, Bulacan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":77199986.09,"abc":77199695.56,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.814548,"lon":120.880753,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matungao","len":null,"ph":null,"dup":[2887],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,146,058.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":803},{"i":2887,"cid":"23CC0141","pid":"P00736005LZ","t":"Construction of Revetment at Matungao, Bulakan, Bulacan","w":"Construction of Revetment","rg":"Region III","pv":"BULACAN","mu":"BULACAN (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":28946072.28,"abc":28949732.62,"fy":"2023","sd":"02/13/2023","cd":"2023-05-20","lat":14.814548,"lon":120.880753,"sm":248,"fm":248,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[2886],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,146,058.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":992},{"i":2888,"cid":"22AI0051","pid":"P00631093LZ","t":"Construction of Flood Control Structure along Banila River, Barangay Diket-Don Justo Abalos, Umingan, Pangasinan","w":"Construction of Revetment","rg":"Region I","pv":"PANGASINAN","mu":"UMINGAN (PANGASINAN)","deo":"Pangasinan 3rd District Engineering Office","co":"JHI CONSTRUCTION & SUPPLY","c":48958019.42,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-10","lat":15.925,"lon":120.88078,"sm":1613,"fm":1613,"tm":1613,"am":1613,"md":0.0,"ls":"inside","ww":"Banila","wn":"Banila River","wd":0.01,"wp":[15.92508,120.88079],"wst":"matched","br":"Diket-Don Justo Abalos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2186},{"i":2889,"cid":"23CC0274","pid":"P00727360LZ","t":"Construction of River Protection along Angat River, K015 + 670 to K015 + 820, Parulan, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"FERDSTAR BUILDERS INC.","c":48999916.12,"abc":48999985.25,"fy":"2023","sd":"03/07/2023","cd":"2023-10-30","lat":14.899133,"lon":120.880817,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.2,"wp":[14.90035,120.87944],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2187},{"i":2890,"cid":"23CC0270","pid":"P00740336LZ","t":"Construction of Flood Control Structure at Barangay Piel, Baliuag, Bulacan (K003+690 to K003+990)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":72374362.28,"abc":72374988.4,"fy":"2023","sd":"03/28/2023","cd":"2023-12-05","lat":14.984714,"lon":120.880856,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2860,2861,2874,2881,2893],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":913},{"i":2891,"cid":"23DF0019","pid":"P00725807LZ","t":"Construction of Revetment along Manila Bay, Barangay 8, Dalahican, Phase II, Cavite City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CAVITE CITY (CAVITE)","deo":"Cavite 1st District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":57900000.0,"abc":57900000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-12-04","lat":14.4616,"lon":120.8809,"sm":360,"fm":360,"tm":360,"am":360,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"8","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2188},{"i":2892,"cid":"22CC0293","pid":"P00640516LZ","t":"Construction of Flood Control Structure, Barangay Hinukay, Baliuag, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":49499675.98,"abc":49499246.76,"fy":"2022","sd":"04/05/2022","cd":"2023-01-29","lat":15.004624,"lon":120.880975,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinukay","len":null,"ph":null,"dup":[],"run":[],"cl":[2816,2846,2847,2855,2857,2859,2873],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Hinukay (2022 to 2023), totalling PHP 576,167,337.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1074},{"i":2893,"cid":"24CC0040","pid":"P00838407LZ","t":"Construction of Riverbank Protection Structure at Barangay Piel, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96499936.68,"abc":96499986.12,"fy":"2024","sd":"02/07/2024","cd":"2024-09-30","lat":14.991599,"lon":120.881125,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piel","len":null,"ph":null,"dup":[],"run":[],"cl":[2105,2256,2336,2630,2856,2860,2861,2874,2881,2890],"L":"field","s":26,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Piel (2022 to 2024), totalling PHP 856,125,382.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":836},{"i":2894,"cid":"23CC0276","pid":"P00727278LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Parulan Plaridel, Bulacan (K016+331 to K016+631)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":72374749.45,"abc":72374990.81,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.801467,"lon":120.881322,"sm":248,"fm":1152,"tm":248,"am":248,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":9.84,"wp":[14.88783,120.85951],"wst":"matched","br":"Parulan Plaridel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.71,"text":"The record contradicts itself: the title and the pin point to Bulacan, Bulacan, but the municipality field names Plaridel, Bulacan, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":497},{"i":2895,"cid":"23CC0080","pid":"P00725762LZ","t":"Construction of Drainage Canal along San Simon, K0073 + (-558) - K0074 + 900, Baliuag, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"GDL CONSTRUCTION","c":62048663.16,"abc":62048765.16,"fy":"2023","sd":"02/13/2023","cd":"2023-07-20","lat":14.9776,"lon":120.881329,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2189},{"i":2896,"cid":"23CC0085","pid":"P00726487LZ","t":"Construction of Riverwall along Guiguinto River, Daungan Section, Sta. 03+060 to Sta. 03+420, Guiguinto, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"GUIGUINTO (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":96499860.92,"abc":96499351.52,"fy":"2023","sd":"02/13/2023","cd":"2023-08-25","lat":14.852175,"lon":120.88148,"sm":597,"fm":597,"tm":597,"am":597,"md":0.0,"ls":"inside","ww":"Guiguinto","wn":"Guiguinto River","wd":0.34,"wp":[14.85018,120.87911],"wst":"matched","br":null,"len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2190},{"i":2897,"cid":"24CC0024","pid":"P00838372LZ","t":"Construction of Riverbank Protection Structure (Phase III) at Barangay San Roque, Baliuag, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":96499563.2,"abc":96499955.84,"fy":"2024","sd":"02/07/2024","cd":"2024-11-02","lat":15.000167,"lon":120.881554,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":"Phase III","dup":[],"run":[2850,2168],"cl":[2168,2265,2837,2840,2848,2850,2852,2880,2883],"L":"field","s":54,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CC0023 to 24CC0025) cover the same site, together worth PHP 265,373,515.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Roque (2023 to 2024), totalling PHP 805,766,954.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":80},{"i":2898,"cid":"22CC0136","pid":"P00630941LZ","t":"Improvement of Major River System and Construction of Spur Dike along Angat River, Sta. 0 + 532 - Sta. 0 + 867, Bintog Section, Plaridel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"PLARIDEL (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"WAWAO BUILDERS","c":62715942.26,"abc":62724446.46,"fy":"2022","sd":"03/07/2022","cd":"2022-10-28","lat":14.902799,"lon":120.881646,"sm":1152,"fm":1152,"tm":1152,"am":1152,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90312,120.88163],"wst":"matched","br":null,"len":335.0,"ph":null,"dup":[],"run":[2765,2641],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CC0136 to 22CC0138) cover the same site, together worth PHP 152,868,005.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":425},{"i":2899,"cid":"23CC0268","pid":"P00726904LZ","t":"Construction of Flood Control System at Barangay Sulivan, Baliuag, Bulacan (Sta. 03+560 to Sta. 03+820)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77198358.83,"abc":77199958.41,"fy":"2023","sd":"03/14/2023","cd":"2023-12-05","lat":14.980967,"lon":120.881703,"sm":136,"fm":136,"tm":136,"am":136,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulivan","len":260.0,"ph":null,"dup":[],"run":[],"cl":[2159,2190,2271,2311,2381,2391,2402,2419,2462,2463],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay Sulivan (2022 to 2024), totalling PHP 842,791,808.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":914},{"i":2900,"cid":"23OA0047","pid":"P00726997LZ","t":"Construction of Kahunari Pumping Station, Brgy. San Jose, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":23488443.33,"abc":23492139.8,"fy":"2023","sd":"03/30/2023","cd":"2024-01-18","lat":14.666647,"lon":120.94626,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2191},{"i":2901,"cid":"21OA0030","pid":"P00525706LZ","t":"Construction of Riverwall along South Pinagkabalian River (Phase 7), Brgy. Panghulo, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":29400000.0,"abc":29340454.15,"fy":"2021","sd":"03/24/2022","cd":"2022-10-19","lat":14.68577,"lon":120.946359,"sm":399,"fm":null,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"South Pinagkabalian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Panghulo","len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2192},{"i":2902,"cid":"23AA0126","pid":"P00725634LZ","t":"Construction of Flood Control Structure along Baag River Left Bank, Sitio Mabiga East, Brgy. Pasaleng, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT","c":57899669.44,"abc":57899669.75,"fy":"2023","sd":"03/13/2023","cd":"2023-08-18","lat":18.5506,"lon":120.946383,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Baag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pasaleng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2193},{"i":2903,"cid":"22OD0154","pid":"P00639409LZ","t":"Construction of Flood Control River Wall along Lingahan Creek (Left Side Bank), Barangay Coloong, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":47382259.09,"abc":48979472.82,"fy":"2022","sd":"03/24/2022","cd":"2023-02-15","lat":14.732294,"lon":120.946429,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Lingahan","wn":"Lingahan River","wd":0.01,"wp":[14.73229,120.94656],"wst":"matched","br":"Coloong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2194},{"i":2904,"cid":"22OD0258","pid":"P00637045LZ","t":"Construction of Flood Control Wall along Bisig- Mabolo, Brgy. Mabolo, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":14373152.0,"abc":14681730.66,"fy":"2022","sd":"05/25/2022","cd":"2022-10-06","lat":14.710239,"lon":120.946486,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2195},{"i":2905,"cid":"24OA0040","pid":"P00820549LZ","t":"Construction of Muzon Riverwall (Phase 7), Barangay Muzon, Malabon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":45334169.87,"abc":45332973.21,"fy":"2024","sd":"02/21/2024","cd":"2024-11-15","lat":14.677531,"lon":120.946503,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 7","dup":[],"run":[2949,2940,2908,2907,2745],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":582},{"i":2906,"cid":"23AA0127","pid":"P00725635LZ","t":"Construction of Flood Control Structure along Baag River Right Bank, Sitio Mabiga East, Brgy. Pasaleng, Pagudpud, Ilocos Norte","w":"Construction of Flood Mitigation Structure","rg":"Region I","pv":"ILOCOS NORTE","mu":"PAGUDPUD (ILOCOS NORTE)","deo":"Ilocos Norte 1st District Engineering Office","co":"RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY","c":57899449.11,"abc":57899449.83,"fy":"2023","sd":"03/13/2023","cd":"2023-07-24","lat":18.550913,"lon":120.946521,"sm":1062,"fm":1062,"tm":1062,"am":1062,"md":0.0,"ls":"inside","ww":"Baag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pasaleng","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2196},{"i":2907,"cid":"24OA0039","pid":"P00820548LZ","t":"Construction of Muzon Riverwall (Phase 6), Barangay Muzon, Malabon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":45333708.44,"abc":45333664.75,"fy":"2024","sd":"02/21/2024","cd":"2024-09-16","lat":14.676401,"lon":120.946687,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 6","dup":[],"run":[2949,2940,2908,2905,2745],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":583},{"i":2908,"cid":"24OA0038","pid":"P00820547LZ","t":"Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 5), Barangay Muzon, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49000000.0,"abc":48998736.38,"fy":"2024","sd":"02/21/2024","cd":"2024-08-21","lat":14.675323,"lon":120.947055,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 5","dup":[],"run":[2949,2940,2907,2905,2745],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":480},{"i":2909,"cid":"24CE0121","pid":"P00823434LZ","t":"Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Caputican, Talavera, Nueva Ecija (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"BRYAN PAUL P. PACHECO CONST. CORP.","c":19106979.97,"abc":19300000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-07-28","lat":15.652687,"lon":120.94716,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.0,"wp":[15.65268,120.94716],"wst":"matched","br":"Caputican","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2197},{"i":2910,"cid":"23BJ0052","pid":"P00727114LZ","t":"Construction of Flood Control Structures along Santa Fe River, Villa Flores, Sta Fe, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"SANTA FE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":42661504.77,"abc":43688160.0,"fy":"2023","sd":"05/02/2023","cd":"2023-11-03","lat":16.16694,"lon":120.94722,"sm":1382,"fm":1382,"tm":1382,"am":1382,"md":0.0,"ls":"inside","ww":"Santa Fe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2198},{"i":2911,"cid":"23DQ0014","pid":"P00725811LZ","t":"Construction of Revetment along Bacoor River, Barangay Mambog I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":77196567.23,"abc":77199945.17,"fy":"2023","sd":"02/15/2023","cd":"2023-12-22","lat":14.42409,"lon":120.94728,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.0,"wp":[14.42409,120.94728],"wst":"matched","br":"Mambog I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2199},{"i":2912,"cid":"23CD0088","pid":"P00725746LZ","t":"Construction of Flood Control Structure, Santa Maria River, Lalakhan Section, Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":86848281.05,"abc":86849709.32,"fy":"2023","sd":"02/27/2023","cd":"2024-05-15","lat":14.816364,"lon":120.947353,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":0.03,"wp":[14.81631,120.94762],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2200},{"i":2913,"cid":"24CD0148","pid":"P00823479LZ","t":"Construction of Flood Control Structure along Sta Maria River and its Tributaries, Barangay Lalakhan, Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"J.G. MENDOZA BUILDERS","c":24124554.7,"abc":24124258.49,"fy":"2024","sd":"04/23/2024","cd":"2024-11-13","lat":14.816552,"lon":120.947435,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta Maria","wn":"Santa Maria River","wd":0.03,"wp":[14.81641,120.94765],"wst":"matched","br":"Lalakhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2201},{"i":2914,"cid":"22CD0051","pid":"P00620157LZ","t":"Construction of Flood Control Structure at Diliman 1st, Mabalas-balas Creek, Diliman 1st, San Rafaael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":54124555.25,"abc":55004629.32,"fy":"2022","sd":"03/07/2022","cd":"2022-10-05","lat":15.02213,"lon":120.94758,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Mabalas-balas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2202},{"i":2915,"cid":"22DQ0009","pid":"P00620898LZ","t":"Construction of Slope Protection Structure along Imus River, Barangay San Miguel, Dasmariñas City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":96494841.42,"abc":96499987.1,"fy":"2022","sd":"03/02/2022","cd":"2023-12-01","lat":14.33664,"lon":120.94762,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.33661,120.94764],"wst":"matched","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2203},{"i":2916,"cid":"24OA0021","pid":"P00820552LZ","t":"Construction of Pumping Station, Navotas City Hall, Barangay Sipac-Almacen, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"STRUKTURA TEKNIKA SERVICES CO.","c":29398741.8,"abc":29397298.99,"fy":"2024","sd":"02/12/2024","cd":"2024-11-05","lat":14.658422,"lon":120.9477,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sipac-Almacen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2204},{"i":2917,"cid":"23DQ0027","pid":"P00725814LZ","t":"Construction of Revetment along Bacoor River, Phase II, Barangay Kaingen, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":77199978.34,"abc":77199994.42,"fy":"2023","sd":"02/15/2023","cd":"2024-02-10","lat":14.45788,"lon":120.94775,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.53,"wp":[14.45312,120.94757],"wst":"matched","br":"Kaingen","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2205},{"i":2918,"cid":"22OA0037","pid":"P00631020LZ","t":"Construction of C-4 Centennial Park Pumping Station, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":19479821.97,"abc":19599649.83,"fy":"2022","sd":"02/14/2022","cd":"2022-11-10","lat":14.652218,"lon":120.947832,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2206},{"i":2919,"cid":"22CC0199","pid":"P00621618LZ","t":"Rehabilitation of Angat River Control Structure, Sta. 00+000 to Sta. 00+345, Brgy. Tibagan, Bustos, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999665.01,"abc":48999871.72,"fy":"2022","sd":"04/05/2022","cd":"2022-10-31","lat":14.959855,"lon":120.94784,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.96011,120.94796],"wst":"matched","br":"Tibagan","len":345.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2207},{"i":2920,"cid":"21DQ0042","pid":"P00525631LZ","t":"Construction of Revetment and Other Improvements, Bacoor River, Brgy. Mambog I, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"Bacoor City","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96499914.67,"abc":96499937.25,"fy":"2021","sd":"10/11/2021","cd":"2022-09-03","lat":14.42939,"lon":120.94788,"sm":98,"fm":null,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.0,"wp":[14.42942,120.94788],"wst":"matched","br":"Mambog I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2208},{"i":2921,"cid":"22OA0101","pid":"P00637757LZ","t":"Construction of Box Culvert along C. Arellano and Sacristia St., Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":14846141.76,"abc":14692274.08,"fy":"2022","sd":"03/24/2022","cd":"2023-05-04","lat":14.666061,"lon":120.947973,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01047,"text":"Contract cost is 1.05% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":962},{"i":2922,"cid":"24CF0002","pid":"P00821256LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Barangay Pagas, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":86849907.06,"abc":86849911.76,"fy":"2024","sd":"02/12/2024","cd":"2024-07-16","lat":15.50354,"lon":120.94799,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.24,"wp":[15.50367,120.94576],"wst":"matched","br":"Pagas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2209},{"i":2923,"cid":"23CD0087","pid":"P00726163LZ","t":"Construction of Flood Control Structure at Barangay Lalakhan, Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":48986913.2,"abc":48999510.17,"fy":"2023","sd":"02/27/2023","cd":"2023-09-18","lat":14.818661,"lon":120.948006,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lalakhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2210},{"i":2924,"cid":"22OD0155","pid":"P00639410LZ","t":"Construction of Flood Control River Wall along Lingahan Creek (Right Side Bank), Barangay Coloong, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":47386189.83,"abc":48980091.57,"fy":"2022","sd":"03/24/2022","cd":"2023-02-15","lat":14.729921,"lon":120.948053,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Lingahan","wn":"Lingahan River","wd":0.0,"wp":[14.72992,120.94806],"wst":"matched","br":"Coloong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2211},{"i":2925,"cid":"22OA0071","pid":"P00640485LZ","t":"Construction of Riverwall along Muzon River, Baranrangay Muzon, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":39600000.0,"abc":39198044.83,"fy":"2022","sd":"03/24/2022","cd":"2022-11-28","lat":14.67332,"lon":120.948259,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Muzon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01025,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":837},{"i":2926,"cid":"21OA0055","pid":"P00561605LZ","t":"Construction of River Wall along Cut-Off Channel, Barangay Bagumbayan North, Navotas City","w":"Construction of Dike","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"City of Navotas","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":24460268.57,"abc":24745431.3,"fy":"2021","sd":"11/11/2021","cd":"2022-09-06","lat":14.650352,"lon":120.948286,"sm":409,"fm":null,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Cut-Off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2212},{"i":2927,"cid":"24C00471","pid":"P00823407LZ","t":"Construction of Flood Control Structure along San Miguel River at Marugay-rugay Bridge 2, Phase 2, Barangay Garlang, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":96499019.62,"abc":96499225.37,"fy":"2024","sd":"05/06/2024","cd":"2025-02-07","lat":15.118202,"lon":120.948343,"sm":1284,"fm":1284,"tm":1284,"am":1330,"md":0.01,"ls":"boundary","ww":"San Miguel","wn":"San Miguel River","wd":0.43,"wp":[15.12209,120.94842],"wst":"matched","br":"Garlang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2213},{"i":2928,"cid":"23CD0121","pid":"P00725745LZ","t":"Construction of Flood Control Structure, Santa Maria River and its tributaries (Bagbaguin-Bolacan), Bagbaguin, Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":86846618.32,"abc":86849868.05,"fy":"2023","sd":"04/24/2023","cd":"2024-03-31","lat":14.807107,"lon":120.948428,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":0.41,"wp":[14.81018,120.94631],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2214},{"i":2929,"cid":"22OA0078","pid":"P00620337LZ","t":"Construction (Completion) of Riverwall along Cut-Off Channel, Barangay Bagumbayan North, Navotas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":24499589.49,"abc":24499743.7,"fy":"2022","sd":"02/28/2022","cd":"2022-09-23","lat":14.650545,"lon":120.948665,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Cut-Off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2215},{"i":2930,"cid":"23OD0099","pid":"P00727019LZ","t":"Construction of Flood Control Wall along Pasolo-Mabolo, Brgy. Pasolo, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"NOVA VENTUS CONSTRUCTION INC.","c":19085950.1,"abc":19581377.84,"fy":"2023","sd":"03/17/2023","cd":"2023-08-23","lat":14.713922,"lon":120.948968,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2216},{"i":2931,"cid":"22CD0017","pid":"P00632831LZ","t":"Construction of Flood Control Structure along Right Side of Meycauayan River (Saluysoy Section), City of Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":39199544.9,"abc":48999431.12,"fy":"2022","sd":"02/28/2022","cd":"2022-07-24","lat":14.74595,"lon":120.94915,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.67,"wp":[14.74025,120.9472],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2217},{"i":2932,"cid":"25CF0012","pid":"P00921492LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Barangay Pagas, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":95052371.1,"abc":96499925.01,"fy":"2025","sd":"02/20/2025","cd":"2025-05-23","lat":15.500144,"lon":120.949206,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.27,"wp":[15.49963,120.94674],"wst":"matched","br":"Pagas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2218},{"i":2933,"cid":"23DQ0015","pid":"P00725815LZ","t":"Construction of Revetment along Bacoor River, Barangay Maliksi II, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":77162485.58,"abc":77199992.9,"fy":"2023","sd":"02/21/2023","cd":"2023-10-18","lat":14.45898,"lon":120.94926,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.67,"wp":[14.45312,120.94757],"wst":"matched","br":"Maliksi II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2219},{"i":2934,"cid":"22D00104","pid":"P00640464LZ","t":"Construction of Seawall, Bulacan-Calamias Section, Mabini, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MABINI (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":115798478.8,"abc":115800000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-11-03","lat":13.747288,"lon":120.949312,"sm":843,"fm":843,"tm":843,"am":843,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2220},{"i":2935,"cid":"22CC0222","pid":"P00632816LZ","t":"Construction of Drainage, Barangay Batia, Bocaue, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC","c":4851085.29,"abc":4949933.95,"fy":"2022","sd":"03/07/2022","cd":"2022-07-04","lat":14.833701,"lon":120.949386,"sm":216,"fm":216,"tm":216,"am":216,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2221},{"i":2936,"cid":"22CC0289","pid":"P00621534LZ","t":"Construction of Flood Control Structure along Angat River, Sta. 0 + 413 - Sta. 0 + 738, Tibagan Section, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48999749.14,"abc":48999797.41,"fy":"2022","sd":"04/05/2022","cd":"2022-09-26","lat":14.953611,"lon":120.949444,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.6,"wp":[14.95894,120.95059],"wst":"matched","br":null,"len":325.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2222},{"i":2937,"cid":"21PA0235","pid":"P00561511LZ","t":"Construction of Sagang Flood Control, Lacub, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"Lacub","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48997000.0,"abc":48999985.61,"fy":"2021","sd":"01/07/2022","cd":"2022-07-24","lat":17.6639,"lon":120.94951,"sm":731,"fm":null,"tm":731,"am":731,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2223},{"i":2938,"cid":"22OA0073","pid":"P00631012LZ","t":"Construction of Asinan Pumping Station, Brgy. San Agustin, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":19599287.13,"abc":19568764.5,"fy":"2022","sd":"02/28/2022","cd":"2022-12-09","lat":14.660205,"lon":120.949577,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2224},{"i":2939,"cid":"22OA0031","pid":"P00631016LZ","t":"Construction of Box-Culvert Drainage along C. Arellano St. (Sigwa St. to Sacristia Pumping Station), Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":9793953.08,"abc":9746639.89,"fy":"2022","sd":"02/14/2022","cd":"2023-07-03","lat":14.661861,"lon":120.949697,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2225},{"i":2940,"cid":"24OA0036","pid":"P00820545LZ","t":"Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 3), Barangay Muzon, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":49000000.0,"abc":48947073.05,"fy":"2024","sd":"02/12/2024","cd":"2024-12-06","lat":14.673057,"lon":120.949779,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 3","dup":[],"run":[2949,2908,2907,2905,2745],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":481},{"i":2941,"cid":"24CF0022","pid":"P00825090LZ","t":"Construction of Flood Control Structure along Peñaranda River, Barangay San Lorenzo, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":94554741.69,"abc":96499921.45,"fy":"2024","sd":"04/02/2024","cd":"2024-06-18","lat":15.3177,"lon":120.9498,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.06,"wp":[15.31827,120.94966],"wst":"matched","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2226},{"i":2942,"cid":"22OD0108","pid":"P00620414LZ","t":"Construction/Rehabilitation of Palasan Relief Pumping Station (RPS) along Polo River, Brgy. Palasan, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":26669657.26,"abc":27496500.92,"fy":"2022","sd":"02/08/2022","cd":"2023-01-03","lat":14.703925,"lon":120.949803,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Polo","wn":"Polo River","wd":0.02,"wp":[14.70405,120.94992],"wst":"matched","br":"Palasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2227},{"i":2943,"cid":"23OA0035","pid":"P00742219LZ","t":"Construction of Yangco Pumping Station, Brgy. Navotas East, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EMICA BUILDERS AND SUPPLY","c":24748789.87,"abc":24743127.4,"fy":"2023","sd":"03/27/2023","cd":"2024-01-12","lat":14.654817,"lon":120.949949,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Navotas East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2228},{"i":2944,"cid":"24CD0163","pid":"P00845988LZ","t":"Construction of Drainage Canal at Brgy. Lalakhan, Sta. Maria, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FORTUNE RDC ENTERPRISES","c":4864752.68,"abc":4938824.31,"fy":"2024","sd":"04/25/2024","cd":"2024-07-23","lat":14.818705,"lon":120.950073,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lalakhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2229},{"i":2945,"cid":"22CD0161","pid":"P00639343LZ","t":"Construction of Flood Control Structure along Maasim River, Sta. 04+200 - Sta. 04+800, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":95051142.43,"abc":96499601.45,"fy":"2022","sd":"03/30/2022","cd":"2023-10-08","lat":15.04069,"lon":120.95046,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":1.99,"wp":[15.03992,120.93193],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[2964,3554],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CD0161 to 22CD0163) cover the same site, together worth PHP 285,153,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":326},{"i":2946,"cid":"24OA0029","pid":"P00820535LZ","t":"Construction of Drainage System along C-4 Road, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"C.B. TAMPENGCO CONSTRUCTION & SUPPLY","c":29399809.82,"abc":29391050.36,"fy":"2024","sd":"02/12/2024","cd":"2024-09-08","lat":14.652607,"lon":120.950783,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2230},{"i":2947,"cid":"24OA0004","pid":"P00820521LZ","t":"Construction (Completion) of Box Culvert Canal along C-4 Road from Lizan to 100 Interior Bagumbayan South, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"TRI-DAN-J CONSTRUCTION AND TRADING","c":11759144.81,"abc":11759800.79,"fy":"2024","sd":"02/12/2024","cd":"2024-05-20","lat":14.652489,"lon":120.950804,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Box Culvert","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2231},{"i":2948,"cid":"23DC0087","pid":"P00742394LZ","t":"Construction of Slope Protection, Brgy. Poblacion, San Nicolas, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN NICOLAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"VAN MAKJAY CONSTRUCTION","c":29699702.0,"abc":29700000.0,"fy":"2023","sd":"03/21/2023","cd":"2024-02-01","lat":13.929457,"lon":120.950893,"sm":1342,"fm":1342,"tm":1342,"am":1342,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2232},{"i":2949,"cid":"24OA0035","pid":"P00820544LZ","t":"Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 2), Barangay Muzon, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":49000000.0,"abc":48991675.95,"fy":"2024","sd":"02/12/2024","cd":"2024-12-20","lat":14.672631,"lon":120.951009,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":"Phase 2","dup":[],"run":[2940,2908,2907,2905,2745],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24OA0035 to 24OA0041) cover the same site, together worth PHP 283,000,407.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":482},{"i":2950,"cid":"24BJ0005","pid":"P00820160LZ","t":"Construction of Flood Control along Sta. Fe River, Balete Section, Sta. Fe, Nueva Vizcaya","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"SANTA FE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":96499928.41,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-29","lat":16.198333,"lon":120.951111,"sm":1382,"fm":1382,"tm":1382,"am":1382,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":0.01,"wp":[16.19833,120.95118],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2233},{"i":2951,"cid":"22DQ0079","pid":"P00641931LZ","t":" Construction/ Rehabilitation/ Improvement of Reinforced Concrete Box Culvert along Cavite-Batangas Rd - K0018 + (-050), Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":29399135.28,"abc":58799951.08,"fy":"2022","sd":"05/04/2022","cd":"2023-10-07","lat":14.4418,"lon":120.95122,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2234},{"i":2952,"cid":"23CD0019","pid":"P00725743LZ","t":"Construction of Flood Control Structure Along Marilao River, Sta. 09 + 700 - Sta. 09 + 855, Marilao, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":66535523.02,"abc":67548754.34,"fy":"2023","sd":"02/22/2023","cd":"2023-08-29","lat":14.7646,"lon":120.951327,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":"Marilao","wn":"Marilao River","wd":0.02,"wp":[14.76459,120.95154],"wst":"matched","br":null,"len":155.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2235},{"i":2953,"cid":"24DQ0003","pid":"P00820325LZ","t":"Construction of Revetment along Bacoor River, Barangay Panapaan IV, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":96499827.17,"abc":96499998.38,"fy":"2024","sd":"02/21/2024","cd":"2024-11-15","lat":14.45013,"lon":120.95141,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.0,"wp":[14.45012,120.9514],"wst":"matched","br":"Panapaan IV","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2236},{"i":2954,"cid":"22DQ0079","pid":"P00641930LZ","t":" Construction/ Rehabilitation/ Improvement of Reinforced Concrete Box Culvert along Cavite-Batangas Rd - K0018 + (-137), Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":29398828.55,"abc":58799951.08,"fy":"2022","sd":"05/04/2022","cd":"2023-10-07","lat":14.44224,"lon":120.95142,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2237},{"i":2955,"cid":"22DC0049","pid":"P00620893LZ","t":"Construction of Riverbank Protection along Pansipit River, Agoncillo-San Nicolas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN NICOLAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":77198940.97,"abc":77200000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-12-06","lat":13.930591,"lon":120.951502,"sm":1342,"fm":1342,"tm":180,"am":1342,"md":0.0,"ls":"inside","ww":"Pansipit","wn":"Pansipit River","wd":0.2,"wp":[13.93096,120.94965],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.1,"text":"The record contradicts itself: the municipality field and the pin point to San Nicolas, Batangas, but the title names Batangas City, Batangas, 16 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":473},{"i":2956,"cid":"22OA0075","pid":"P00637756LZ","t":"Construction of Drainage in Brgy. Panghulo, Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"GECEL CONSTRUCTION","c":9900000.0,"abc":9799862.54,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.686681,"lon":120.951599,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panghulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01022,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":963},{"i":2957,"cid":"22OA0074","pid":"P00632703LZ","t":"Construction of Pumping Station, Barangay Tañong, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":21779964.74,"abc":21554682.3,"fy":"2022","sd":"02/28/2022","cd":"2022-10-25","lat":14.653519,"lon":120.951734,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tañong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01045,"text":"Contract cost is 1.05% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":915},{"i":2958,"cid":"24DQ0041","pid":"P00823548LZ","t":"Construction of Revetment along Bacoor River, Phase II, Brgy. Habay I and Brgy. Panapaan IV, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":96097340.67,"abc":96499973.59,"fy":"2024","sd":"05/17/2024","cd":"2025-03-10","lat":14.44865,"lon":120.95191,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.0,"wp":[14.44863,120.95194],"wst":"matched","br":"Habay I","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2238},{"i":2959,"cid":"23BJ0033","pid":"P00725662LZ","t":"Construction of Flood Control Structures at Baliling-Calitlitan Section, Sta. Fe, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"SANTA FE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":96488725.58,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-15","lat":16.21166,"lon":120.95194,"sm":1382,"fm":1382,"tm":1382,"am":74,"md":0.24,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2239},{"i":2960,"cid":"24E00010","pid":"P00825124LZ","t":"Construction of Nagapi Riverbank Protection Works along Nagapi River (Upstream Rightside), Sablayan, Occidental Mindoro - (CO/RO)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SABLAYAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":192997550.6,"abc":193000000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-09-05","lat":12.658347,"lon":120.952047,"sm":1228,"fm":1228,"tm":1228,"am":307,"md":4.27,"ls":"outside","ww":"Nagapi","wn":"Nagapi River","wd":0.02,"wp":[12.65831,120.95219],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":51,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.71,"value":4.27,"text":"The pin is 4.3 km outside Sablayan, Occidental Mindoro, the nearest municipality the record claims. It falls in Calintaan, Occidental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":184},{"i":2961,"cid":"23CF0081","pid":"P00740600LZ","t":"Construction (Improvement) of Drainage Structure, Barangay San Lorenzo, Gapan City, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":19599909.61,"abc":19599956.44,"fy":"2023","sd":"03/24/2023","cd":"2023-07-17","lat":15.3127,"lon":120.9523,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2240},{"i":2962,"cid":"22OD0104","pid":"P00620415LZ","t":"Construction/Rehabilitation of Pasolo Relief Pumping Station (RPS) Brgy. Pasolo, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":37997833.18,"abc":39178967.46,"fy":"2022","sd":"02/08/2022","cd":"2022-12-13","lat":14.70631,"lon":120.952341,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2241},{"i":2963,"cid":"23CC0122","pid":"P00726716LZ","t":"Construction of River Control Project along Angat River, Tibagan Section, Sta. 00+615 - Sta. 00+845, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48992852.15,"abc":48999415.58,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.956144,"lon":120.952348,"sm":265,"fm":265,"tm":265,"am":265,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.21,"wp":[14.95757,120.95366],"wst":"matched","br":null,"len":230.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2242},{"i":2964,"cid":"22CD0162","pid":"P00639344LZ","t":"Construction of Flood Control Structure along Maasim River, Sta. 04+800 - Sta. 05+400 , San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":95051207.16,"abc":96499667.16,"fy":"2022","sd":"03/30/2022","cd":"2023-01-07","lat":15.03733,"lon":120.95245,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":2.22,"wp":[15.03715,120.93179],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[2945,3554],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CD0161 to 22CD0163) cover the same site, together worth PHP 285,153,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":327},{"i":2965,"cid":"24CD0206","pid":"P00825104LZ","t":"Rehabilitation of Ibayo-Saluysoy Pumping Stations including Flood Gate, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":48249942.61,"abc":48235603.39,"fy":"2024","sd":"06/05/2024","cd":"2025-04-11","lat":14.751341,"lon":120.952471,"sm":406,"fm":406,"tm":406,"am":941,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2243},{"i":2966,"cid":"23EB0027","pid":"P00726765LZ","t":"Construction of Anahawin River Flood Control Structure, Barangay Iriron, Sta. 0 + 000 - Sta. 0 + 680, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"R N V CONSTRUCTION","c":45079468.4,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-15","lat":12.58507,"lon":120.95264,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Anahawin","wn":"Anahawin River","wd":0.03,"wp":[12.58491,120.95281],"wst":"matched","br":"Iriron","len":680.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2244},{"i":2967,"cid":"22DQ0004","pid":"P00620897LZ","t":"Construction of Slope Protection Structure along Imus River, Barangay Salitran II, Dasmariñas City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":96498513.53,"abc":96499988.29,"fy":"2022","sd":"03/02/2022","cd":"2023-02-24","lat":14.334,"lon":120.95268,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.01,"wp":[14.33402,120.95275],"wst":"matched","br":"Salitran II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2245},{"i":2968,"cid":"23CD0057","pid":"P00727364LZ","t":"Rehabilitation of Pumping Stations at Meycauayan City, Bulacan","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FORTUNE RDC ENTERPRISES","c":29105439.55,"abc":29399433.89,"fy":"2023","sd":"03/13/2023","cd":"2023-04-30","lat":14.7513,"lon":120.9527,"sm":406,"fm":406,"tm":248,"am":941,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.37,"text":"The record contradicts itself: the municipality field and the pin point to City of Meycauayan, Bulacan, but the title names Bulacan, Bulacan, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":584},{"i":2969,"cid":"23EB0037","pid":"P00726599LZ","t":"Construction of Flood Control Structure along Lumintao River going to Sitio Cansaliw, New Dagupan, Sta. 0+000 - Sta. 0+865, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96424967.48,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-01-07","lat":12.528943,"lon":120.952799,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.39,"wp":[12.52562,120.95169],"wst":"matched","br":null,"len":865.0,"ph":null,"dup":[],"run":[3065,4447],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23EB0036 to 23EB0039) cover the same site, together worth PHP 242,134,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":271},{"i":2970,"cid":"22OD0105","pid":"P00620413LZ","t":"Construction/Rehabilitation of Arkong Bato Relief Pumping Station (RPS) along Polo River, Brgy. Arkong Bato, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":28495848.53,"abc":29375016.64,"fy":"2022","sd":"02/08/2022","cd":"2023-01-03","lat":14.698933,"lon":120.95283,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Polo","wn":"Polo River","wd":0.01,"wp":[14.69898,120.95292],"wst":"matched","br":"Arkong Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2246},{"i":2971,"cid":"24DQ0046","pid":"P00846058LZ","t":"Construction of Revetment, Brgy. Maliksi, Bacoor, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":15839774.23,"abc":15839917.35,"fy":"2024","sd":"05/15/2024","cd":"2024-09-13","lat":14.46384,"lon":120.95319,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maliksi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2247},{"i":2972,"cid":"24O00023","pid":"P00823268LZ","t":"Construction of South Pinagkabalian Pumping Station (Phase 2), Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":144747339.9,"abc":144668963.5,"fy":"2024","sd":"03/08/2024","cd":"2024-08-31","lat":14.674352,"lon":120.953308,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2248},{"i":2973,"cid":"24OA0050","pid":"P00820037LZ","t":"Construction of Flood Control Structure, Barangay Tañong to Barangay Dampalit, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":93551903.43,"abc":96455205.1,"fy":"2024","sd":"02/21/2024","cd":"2024-11-18","lat":14.652845,"lon":120.95339,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tañong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2249},{"i":2974,"cid":"23OA0084","pid":"P00726797LZ","t":"Rehabilitation of Riverwall along Tullahan River at Brgy. San Agustin to Brgy. Concepcion, Malabon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":144750000.0,"abc":144745347.2,"fy":"2023","sd":"04/19/2023","cd":"2024-04-05","lat":14.663928,"lon":120.953435,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":0.05,"wp":[14.6641,120.95382],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2250},{"i":2975,"cid":"22CD0001","pid":"P00620164LZ","t":"Construction of Flood Control Structure, Meycauayan River and its Tributaries, Saluysoy Side, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":91703405.56,"abc":95534332.28,"fy":"2022","sd":"03/07/2022","cd":"2022-09-05","lat":14.73972,"lon":120.95354,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.04,"wp":[14.73933,120.95359],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2251},{"i":2976,"cid":"22OA0018","pid":"P00620046LZ","t":"Construction of Riverwall along Malabon-Tullahan River, Brgy. Niugan, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) / MGY BUILDERS CORPORATION","c":62722541.71,"abc":63696605.7,"fy":"2022","sd":"03/24/2022","cd":"2023-02-17","lat":14.670445,"lon":120.953645,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Niugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2252},{"i":2977,"cid":"21OA0029","pid":"P00525707LZ","t":"Construction of Riverwall along Malabon-Tullahan River, Brgy. San Agustin, Malabon City","w":"Construction of Dike","rg":"National Capital Region","pv":"MALABON CITY","mu":"City of Malabon","deo":"Malabon-Navotas District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":41649942.02,"abc":41644719.63,"fy":"2021","sd":"03/24/2022","cd":"2022-10-28","lat":14.6634,"lon":120.953673,"sm":399,"fm":null,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2253},{"i":2978,"cid":"24PI0050","pid":"P00839567LZ","t":"Construction of Flood Mitigation Structure protecting Public InfraStructure/Facilities, Barangay Mainit, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"YCHONGLIYAN CONSTRUCTION","c":4950000.0,"abc":4949999.5,"fy":"2024","sd":"05/06/2024","cd":"2024-07-15","lat":17.15097,"lon":120.95409,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mainit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2254},{"i":2979,"cid":"23CF0087","pid":"P00726523LZ","t":"Construction of Flood Control Mitigation Structure along Peñaranda River, Sta. 4+603.36-Sta. 5+342.36, Barangay San Lorenzo, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":116310433.0,"abc":116311439.5,"fy":"2023","sd":"04/11/2023","cd":"2023-10-20","lat":15.31862,"lon":120.95426,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.19,"wp":[15.31986,120.95299],"wst":"matched","br":"San Lorenzo","len":739.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2255},{"i":2980,"cid":"22PI0017","pid":"P00632787LZ","t":"Construction of Flood Control, Barangay Mainit, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"YCHONGLIYAN CONSTRUCTION","c":4950000.0,"abc":4949999.7,"fy":"2022","sd":"02/17/2022","cd":"2022-07-03","lat":17.15041,"lon":120.95452,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mainit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2256},{"i":2981,"cid":"23CF0075","pid":"P00727302LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Pambuan, Gapan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CITY OF GAPAN (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":96499930.51,"abc":96499911.74,"fy":"2023","sd":"03/24/2023","cd":"2023-09-22","lat":15.318063,"lon":120.954641,"sm":386,"fm":386,"tm":386,"am":386,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.27,"wp":[15.31977,120.95289],"wst":"matched","br":"Pambuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2257},{"i":2982,"cid":"23OA0048","pid":"P00726998LZ","t":"Construction of Mamale 1 Pumping Station, NBBS Dagat Dagatan, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":23266135.62,"abc":23272624.4,"fy":"2023","sd":"03/08/2023","cd":"2023-11-02","lat":14.650288,"lon":120.954655,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2258},{"i":2983,"cid":"23ED0096","pid":"P00742457LZ","t":"Construction of Drainange Canal at Poblacion, Puerto Galera, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PUERTO GALERA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"HEAZ CONSTRUCTION","c":4949871.74,"abc":4950000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-07-08","lat":13.49944,"lon":120.9547,"sm":1179,"fm":1179,"tm":1179,"am":1179,"md":0.0,"ls":"inside","ww":"Drainange","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2259},{"i":2984,"cid":"22DQ0062","pid":"P00631297LZ","t":"Construction/ Rehabilitation/ Improvement of Reinforced Concrete Box Culvert along Manila-Cavite (NCR Bdry-Jct Cavite City Sect), K0016 + 880, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":9799854.94,"abc":19599972.66,"fy":"2022","sd":"04/04/2022","cd":"2023-10-24","lat":14.44974,"lon":120.95497,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2260},{"i":2985,"cid":"22CD0167","pid":"P00631224LZ","t":"Construction of Slope Protection and Drainage System, Barangay Tabing Bakod, Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES)","c":7836269.39,"abc":7838583.29,"fy":"2022","sd":"06/27/2022","cd":"2022-11-27","lat":14.79833,"lon":120.955,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabing Bakod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2261},{"i":2986,"cid":"23CD0020","pid":"P00725744LZ","t":"Construction of Flood Control Structure Along Marilao River, Sta. 09 + 855 - Sta. 10 + 010, Marilao, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":57899228.21,"abc":57898878.97,"fy":"2023","sd":"02/22/2023","cd":"2023-10-20","lat":14.768,"lon":120.955,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":"Marilao","wn":"Marilao River","wd":0.03,"wp":[14.76775,120.95512],"wst":"matched","br":null,"len":155.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2262},{"i":2987,"cid":"23OD0093","pid":"P00727020LZ","t":"Construction of Pumping Station At Veinte Reales - Sta.Lucia, Veinte Reales, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"NOVA VENTUS CONSTRUCTION INC.","c":28627073.37,"abc":29375181.46,"fy":"2023","sd":"03/17/2023","cd":"2024-06-05","lat":14.708968,"lon":120.955166,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2263},{"i":2988,"cid":"23OA0043","pid":"P00726991LZ","t":"Construction of Maliputo Pumping Station, Brgy. NBBS Dagat-Dagatan, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":23274555.73,"abc":23272418.8,"fy":"2023","sd":"03/08/2023","cd":"2023-10-10","lat":14.653003,"lon":120.955265,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"NBBS Dagat-Dagatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2264},{"i":2989,"cid":"23OA0034","pid":"P00742216LZ","t":"Construction of Takino Pumping Station, Bangkulasi, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":19799964.89,"abc":19796201.55,"fy":"2023","sd":"03/27/2023","cd":"2023-09-22","lat":14.648769,"lon":120.955266,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2265},{"i":2990,"cid":"23DG0016","pid":"P00726218LZ","t":"Construction of Slope Protection Structure along creek at Tagaytay-Batangas Arterial H-way","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"TAGAYTAY CITY (CAVITE)","deo":"Cavite 2nd District Engineering Office","co":"WRC CONSTRUCTION AND GENERAL MERCHANDISE","c":9799430.14,"abc":9799597.75,"fy":"2023","sd":"02/17/2023","cd":"2023-07-24","lat":14.130851,"lon":120.955326,"sm":1512,"fm":1512,"tm":null,"am":1512,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2266},{"i":2991,"cid":"24OA0071","pid":"P00845859LZ","t":"Construction of Flood Mitigation System at R10, Barangay North Bay Boulevard South - Proper, Navotas City, Metro Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JONOR DC CONSTRUCTION","c":9899596.98,"abc":9899720.83,"fy":"2024","sd":"02/23/2024","cd":"2024-08-12","lat":14.639325,"lon":120.955808,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"North Bay Boulevard South","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2267},{"i":2992,"cid":"22OA0058","pid":"P00620019LZ","t":"Construction of Box-Culvert along R-10 Road (North Bound) from C-3 Road to Lapu-Lapu Avenue, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.","c":53074618.75,"abc":53891223.95,"fy":"2022","sd":"02/21/2022","cd":"2023-03-15","lat":14.639245,"lon":120.955956,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2268},{"i":2993,"cid":"22OA0002","pid":"P00620339LZ","t":"Construction of Box Culvert along R10 Road (Phase IV), Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"C.B. TAMPENGCO CONSTRUCTION & SUPPLY","c":9799337.36,"abc":9787727.85,"fy":"2022","sd":"02/14/2022","cd":"2022-07-08","lat":14.639207,"lon":120.955973,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2269},{"i":2994,"cid":"22CD0049","pid":"P00620525LZ","t":"Construction of Flood Control Structure along San Miguel River, San Agustin to Batasan Bata Section, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"GLOBALCRETE BUILDERS INC.","c":45004286.0,"abc":46059664.51,"fy":"2022","sd":"02/28/2022","cd":"2022-09-11","lat":15.13314,"lon":120.95602,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.04,"wp":[15.13288,120.95624],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2270},{"i":2995,"cid":"22DQ0060","pid":"P00630952LZ","t":"Construction of Revetment along Maliksi River, Brgy. Talaba, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":77199196.47,"abc":77199985.03,"fy":"2022","sd":"04/07/2022","cd":"2023-11-20","lat":14.46503,"lon":120.95605,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Maliksi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2271},{"i":2996,"cid":"22DQ0003","pid":"P00620894LZ","t":"Construction of Slope Protection along Imus River (Tributary to Manila Bay), Brgy. Burol Main, Dasmariñas City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":94569844.56,"abc":94569928.24,"fy":"2022","sd":"03/02/2022","cd":"2023-03-10","lat":14.32838,"lon":120.95624,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.02,"wp":[14.32842,120.95642],"wst":"matched","br":"Burol Main","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2272},{"i":2997,"cid":"23OA0042","pid":"P00726990LZ","t":"Construction of Site 8 (Mamale 2) Pumping Station, Brgy. NBBS Dagat-Dagatan, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":23273276.64,"abc":23269137.14,"fy":"2023","sd":"03/08/2023","cd":"2023-12-26","lat":14.648603,"lon":120.956247,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"NBBS Dagat-Dagatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2273},{"i":2998,"cid":"23OA0038","pid":"P00742222LZ","t":"Construction of Martiniko Pumping Station (Boundary of Navotas and Malabon), NBBS Dagat-Dagatan, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EMICA BUILDERS AND SUPPLY","c":19799982.32,"abc":19793401.5,"fy":"2023","sd":"03/27/2023","cd":"2024-01-25","lat":14.653843,"lon":120.956295,"sm":409,"fm":409,"tm":409,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2274},{"i":2999,"cid":"22OA0077","pid":"P00621405LZ","t":"Construction/Installation of Pumping Station including drainage system, Brgy. Longos, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":48997556.66,"abc":48996047.5,"fy":"2022","sd":"03/24/2022","cd":"2023-03-15","lat":14.655026,"lon":120.95644,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Longos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2275},{"i":3000,"cid":"22BC0152","pid":"P00640508LZ","t":"Construction of Embankment Protection (Gabion) at Salongsong Creek, Barangay Salongsong, Sta. Praxedes, Cagayan","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS","c":11880000.0,"abc":11880000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-09-02","lat":18.549032,"lon":120.98727,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":"Salongsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salongsong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2276},{"i":3001,"cid":"22CC0035","pid":"P00631179LZ","t":"Construction of Flood Control Structure along Balagtas River (Sta. 0 + 776 to Sta. 1 + 372), Barangay Panginay, Balagtas, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BALAGTAS (BIGAA) (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":45079869.08,"abc":45079581.87,"fy":"2022","sd":"02/24/2022","cd":"2022-12-02","lat":14.81315,"lon":120.98729,"sm":117,"fm":117,"tm":117,"am":1395,"md":6.28,"ls":"outside","ww":"Balagtas","wn":"Balagtas River","wd":6.82,"wp":[14.83261,120.92716],"wst":"matched","br":"Panginay","len":596.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.28,"text":"The pin is 6.3 km outside Balagtas, Bulacan, the nearest municipality the record claims. It falls in Santa Maria, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":6.82,"text":"The title names Balagtas, which OpenStreetMap maps through the stated municipality, but the pin is 6.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":102},{"i":3002,"cid":"23BC0056","pid":"P00736185LZ","t":"Construction of River Control Structure along Sanjera Baliw, Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"02/01/2023","cd":"2023-06-29","lat":18.57307,"lon":120.98746,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2277},{"i":3003,"cid":"22OE0017","pid":"P00620061LZ","t":"Construction of Pumping Station along Estero dela Reina including accessories, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"LE BRON CONSTRUCTION / AYLAN CONSTRUCTION & TRADING","c":69116317.98,"abc":72374819.67,"fy":"2022","sd":"04/01/2022","cd":"2023-07-28","lat":14.61709,"lon":120.97098,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.61709,120.97091],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3980],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 117,308,825.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":838},{"i":3004,"cid":"22OH0019","pid":"P00620067LZ","t":"Drainage Improvement along Remedios St. from Remedios Circle to Singalong St., Malate, Manila Phase II","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77169300.35,"abc":77200000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-08-30","lat":14.57092,"lon":120.987501,"sm":892,"fm":null,"tm":892,"am":892,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2278},{"i":3005,"cid":"24OE0109","pid":"P00824613LZ","t":"Construction of Flood Mitigation Structure along Estero de San Miguel, Barangay 385, Manila City","w":"Construction of Revetment","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"W.J. CONSTRUCTION OPC (FORMERLY: W.J. CONSTRUCTION)","c":24499058.29,"abc":24499202.34,"fy":"2024","sd":"02/13/2024","cd":"2024-06-18","lat":14.594613,"lon":120.987829,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.01,"wp":[14.59456,120.9878],"wst":"matched","br":"385","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":10},{"i":3006,"cid":"24OD0077","pid":"P00824605LZ","t":"Construction of Reinforced Concrete Box Culvert along C-3 Road (5th st. - Tagaytay st.), Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DREAMWORX BUILDER & TRADING, INC.","c":19169148.28,"abc":19599830.34,"fy":"2024","sd":"02/27/2024","cd":"2024-09-30","lat":14.644226,"lon":120.987928,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2279},{"i":3007,"cid":"22CF0011","pid":"P00632836LZ","t":"Construction of Drainage, Peñaranda, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PEÑARANDA (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"NIVIN DEVELOPMENT CONSTRUCTION CORP.","c":7840925.62,"abc":7919551.33,"fy":"2022","sd":"02/14/2022","cd":"2022-07-19","lat":15.350849,"lon":121.004536,"sm":1119,"fm":1119,"tm":1119,"am":1119,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2280},{"i":3008,"cid":"24OE0035","pid":"P00823244LZ","t":"Installation of Booster Pump at Estero de Magdalena, La Torre St. (Package 1b), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":144747306.1,"abc":144749532.0,"fy":"2024","sd":"02/07/2024","cd":"2024-06-28","lat":14.6082,"lon":120.977247,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.6082,120.97725],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3917,3727,3731],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OE0034 to 24OE0037) cover the same site, together worth PHP 506,589,934.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":175},{"i":3009,"cid":"23OD0111","pid":"P00742242LZ","t":"Construction of Drainage System along Brgy. 123, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":9666111.95,"abc":9893317.67,"fy":"2023","sd":"03/17/2023","cd":"2023-08-28","lat":14.644865,"lon":120.98797,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"123","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2281},{"i":3010,"cid":"22OE0011","pid":"P00620432LZ","t":"Construction of Retarding Basin at Estero dela Reina, (Phase III), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":48999120.68,"abc":48999912.96,"fy":"2022","sd":"02/18/2022","cd":"2022-10-06","lat":14.598331,"lon":120.98801,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.85,"wp":[14.5983,120.98015],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[3226,3980],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OE0011 to 22OE0013) cover the same site, together worth PHP 146,190,709.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":519},{"i":3011,"cid":"24OD0003","pid":"P00820585LZ","t":"Construction of Drainage along Service Road, Barangay Gen. T. de Leon, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"ISECURE BUILDER AND CONSTRUCTION SUPPLIES","c":9446337.32,"abc":9788963.69,"fy":"2024","sd":"02/14/2024","cd":"2024-06-03","lat":14.692791,"lon":120.988029,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gen. T. de Leon","len":null,"ph":null,"dup":[],"run":[3455,3151],"cl":[],"L":"field","s":29,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OD0003 to 24OD0006) cover the same site, together worth PHP 28,354,810.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":678},{"i":3012,"cid":"22OA0064","pid":"P00620013LZ","t":"Closing of Remaining Gaps along Malabon-Tullahan River (Potrero Section), Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":90696775.43,"abc":92098700.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-03","lat":14.669449,"lon":120.988104,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2282},{"i":3013,"cid":"23DQ0064","pid":"P00742426LZ","t":"Construction (Completion) of Drainage and Other Improvements at Greenvalley, Brgy. San Nicolas 3, Bacoor, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":3457587.29,"abc":3464953.33,"fy":"2023","sd":"04/24/2023","cd":"2023-06-30","lat":14.41714,"lon":120.98813,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2283},{"i":3014,"cid":"23BC0057","pid":"P00736186LZ","t":"Construction of River Control Structure along Sitio Surngot, Barangay Portabaga, Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"02/01/2023","cd":"2023-07-24","lat":18.54417,"lon":121.01483,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Portabaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2284},{"i":3015,"cid":"22OE0006","pid":"P00620100LZ","t":"Installation of Booster Pump including Retarding Basin at Estero de San Miguel at P. Casal Bridge, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"AL-AMEN BUILDERS / ST. TIMOTHY CONSTRUCTION CORPORATION","c":96467251.95,"abc":96499921.47,"fy":"2022","sd":"02/24/2022","cd":"2023-08-15","lat":14.5943,"lon":120.98815,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59431,120.98816],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":11},{"i":3016,"cid":"22OE0087","pid":"P00620426LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de San Sebastian, (LS) Sta. 0+000 to Sta. 0+055 & Sta. 0+065 to Sta. 0+140, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EL-JAKE BUILDERS","c":39892353.69,"abc":41795839.58,"fy":"2022","sd":"02/23/2022","cd":"2022-10-05","lat":14.5984,"lon":120.9882,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Sebastian","wn":"Estero de San Sebastian","wd":0.0,"wp":[14.59841,120.9882],"wst":"matched","br":null,"len":130.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":12},{"i":3017,"cid":"23OE0053","pid":"P00725496LZ","t":"Construction of Retention Basin along Estero de San Miguel, Barangay 638, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":38542194.45,"abc":38599963.4,"fy":"2023","sd":"02/17/2023","cd":"2023-12-18","lat":14.600263,"lon":120.99461,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.60022,120.9946],"wst":"matched","br":"638","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":13},{"i":3018,"cid":"22DQ0010","pid":"P00620225LZ","t":"Construction of Revetment along Carmona River, Brgy. Cabilang Baybay, Phase II, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION / OMNICON BUILDERS","c":96486466.78,"abc":96499997.8,"fy":"2022","sd":"03/07/2022","cd":"2022-07-22","lat":14.31831,"lon":121.04898,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.61,"wp":[14.31106,121.06192],"wst":"matched","br":"Cabilang Baybay","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2285},{"i":3019,"cid":"24OE0040","pid":"P00823239LZ","t":"Construction of Tayuman Pumping Station, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":96496919.11,"abc":96498992.55,"fy":"2024","sd":"02/07/2024","cd":"2025-02-18","lat":14.617897,"lon":120.97098,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":14},{"i":3020,"cid":"24BC0098","pid":"P00845936LZ","t":"Construction of River Control Structure along Langangan River, Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":4874771.71,"abc":4950000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-07-13","lat":18.563645,"lon":120.988205,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":"Langangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2286},{"i":3021,"cid":"24CD0102","pid":"P00845782LZ","t":"Bank Improvement along Sta. Maria River and Tributaries, Sta. 08+900 - Sta. 09+304 (San Jose Patag-Pulong Buhangin Section), Sta. Maria, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":98912408.09,"abc":98999423.83,"fy":"2024","sd":"03/18/2024","cd":"2025-04-06","lat":14.840463,"lon":120.988277,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":1.84,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":404.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2287},{"i":3022,"cid":"23OH0010","pid":"P00726037LZ","t":"Construction of Slope Protection of Libertad Retarding Pond, Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALE BUILDERS CONSTRUCTION AND DEVELOPMENT CORP.","c":29399474.44,"abc":29399800.22,"fy":"2023","sd":"02/16/2023","cd":"2023-05-08","lat":14.544405,"lon":120.988287,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2288},{"i":3023,"cid":"22OC0058","pid":"P00620077LZ","t":"Improvement / Slope Protection of Balihatar Creek (North Side), District I, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"R.M. NUNEZ CONSTRUCTION CORPORATION(FORMERLY R.M. / AKN CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-12","lat":14.483975,"lon":120.988463,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Balihatar","wn":"Balihatar Creek","wd":0.01,"wp":[14.484,120.98836],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2289},{"i":3024,"cid":"24OE0181","pid":"P00823249LZ","t":"Installation of Booster Pump at P. Casal Bridge (Phase III) at Estero de San Miguel, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":76149978.47,"abc":76234855.21,"fy":"2024","sd":"02/14/2024","cd":"2024-06-15","lat":14.594054,"lon":120.988483,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59404,120.98847],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":15},{"i":3025,"cid":"22OC0061","pid":"P00620369LZ","t":"Rehabilitation / Upgrading and Drainage Improvement at Tramo I & its vicinity, Brgy. San Dionisio, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":24491160.45,"abc":24500000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-12-19","lat":14.48913,"lon":120.98857,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2290},{"i":3026,"cid":"24CD0010","pid":"P00839582LZ","t":"Construction of Flood Control Sturcture along Santa Maria River and its Tributaries, Sta. 09 + 100 to Sta. 09 + 300 (Balasing -Pulong Buhangin Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":49496490.33,"abc":49499175.02,"fy":"2024","sd":"02/12/2024","cd":"2024-10-26","lat":14.840722,"lon":120.988578,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":1.86,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[3033,3043],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0010 to 24CD0012) cover the same site, together worth PHP 146,512,589.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":483},{"i":3027,"cid":"23OC0044","pid":"P00737396LZ","t":"Construction of Drainage System at Tramo 1 (From Las Piñas Boundary to Kabihasnan), Barangay San Dionisio, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":13856409.32,"abc":13860000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-09-19","lat":14.48918,"lon":120.988585,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2291},{"i":3028,"cid":"23OC0087","pid":"P00727011LZ","t":"Construction of Box Culvert with Revetment along Coastal Road (San Dionisio Section, Phase II), Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY","c":39180318.0,"abc":39200000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-01-18","lat":14.497113,"lon":120.988669,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2292},{"i":3029,"cid":"23OI0008","pid":"P00725548LZ","t":"Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":67548419.47,"abc":67549654.17,"fy":"2023","sd":"02/13/2023","cd":"2023-09-10","lat":14.474089,"lon":120.98874,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Kantarilla","wn":"Kantarilla Creek","wd":2.12,"wp":[14.46735,120.97036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2293},{"i":3030,"cid":"22CD0216","pid":"P00621537LZ","t":"Construction of Flood Control Structure along Sta. Maria River, Sta. 6 + 800 - Sta. 7 + 140 (Right Side), Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48998090.48,"abc":48999968.79,"fy":"2022","sd":"03/30/2022","cd":"2022-10-15","lat":14.82655,"lon":120.98884,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.35,"wp":[14.82344,120.98963],"wst":"matched","br":null,"len":340.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2294},{"i":3031,"cid":"22OD0131","pid":"P00620395LZ","t":"Construction of Flood Control Wall along Gumamela Extension, Brgy. Gen. T. De Leon, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":19029943.69,"abc":19598314.51,"fy":"2022","sd":"03/24/2022","cd":"2022-11-17","lat":14.680041,"lon":120.988841,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gen. T. De Leon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2295},{"i":3032,"cid":"18EB0112","pid":"P00223240LZ","t":"Construction of Busuanga River Flood Control Structures (Adela Section), Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Rizal","deo":"Mindoro Occidental District Engineering Office","co":"FFJJ CONSTRUCTION","c":52442670.04,"abc":54570750.0,"fy":"2018","sd":"04/20/2018","cd":"2023-01-02","lat":12.43518,"lon":120.98888,"sm":1210,"fm":null,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Busuanga","wn":"Busuanga River","wd":0.05,"wp":[12.43545,120.98851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2296},{"i":3033,"cid":"24CD0011","pid":"P00839583LZ","t":"Construction of Flood Control Sturcture along Santa Maria River and its Tributaries, Sta. 09 + 300 to Sta. 09 + 500 (Balasing -Pulong Buhangin Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":49495385.93,"abc":49499622.01,"fy":"2024","sd":"02/12/2024","cd":"2024-12-11","lat":14.842428,"lon":120.98896,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.03,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[3026,3043],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0010 to 24CD0012) cover the same site, together worth PHP 146,512,589.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":484},{"i":3034,"cid":"22OI0022","pid":"P00620904LZ","t":"Construction of Flood Control Structure at Balihatar, Brgy. Manuyo 1, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":48999843.4,"abc":48999947.72,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.482936,"lon":120.989006,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manuyo 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2297},{"i":3035,"cid":"23CD0104","pid":"P00737466LZ","t":"Construction of Drainage Canal, Barangay Buenavista, Sta. Maria, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"PLL BUILDERS INC.","c":5927984.05,"abc":5935481.14,"fy":"2023","sd":"03/22/2023","cd":"2023-09-17","lat":14.80267,"lon":120.98922,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2298},{"i":3036,"cid":"23CE0134","pid":"P00742337LZ","t":"Improvement of River Channel along Talavera River (Brgy. Cabubulaonan), Talavera, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":98995000.0,"abc":99000000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-09-04","lat":15.674794,"lon":120.989415,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.05,"wp":[15.67522,120.98952],"wst":"matched","br":"Cabubulaonan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2299},{"i":3037,"cid":"23EB0028","pid":"P00726764LZ","t":"Construction of Busuanga Flood Control Structure (Adela Section), Sta. 0 + 000 - Sta. 0 + 418, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / MIGHTY DRAGON BUILDERS INC.","c":44927793.73,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-05-22","lat":12.43658,"lon":120.98944,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":418.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2300},{"i":3038,"cid":"23OC0083","pid":"P00742110LZ","t":"Construction of Revetment along Paranaque River Mouth (North Side) Paranaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":98997516.14,"abc":99000000.0,"fy":"2023","sd":"08/14/2023","cd":"2024-11-18","lat":14.502652,"lon":120.989465,"sm":411,"fm":411,"tm":null,"am":411,"md":0.0,"ls":"inside","ww":"Paranaque","wn":"Parañaque River","wd":0.03,"wp":[14.50242,120.98944],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2301},{"i":3039,"cid":"24OH0015","pid":"P00839538LZ","t":"Construction of Slope Protection Structure along Libertad Retarding Pond (Phase 3), Barangay 76, Zone 10, Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALE BUILDERS CONSTRUCTION AND DEVELOPMENT CORP.","c":19572165.42,"abc":19799821.65,"fy":"2024","sd":"02/20/2024","cd":"2024-07-15","lat":14.545141,"lon":120.989495,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"76","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2302},{"i":3040,"cid":"23OD0068","pid":"P00725563LZ","t":"Rehabilitation of Flood Control Wall along Fortune Creek, Barangay Parada, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY","c":75879939.88,"abc":77192219.07,"fy":"2023","sd":"02/21/2023","cd":"2024-01-16","lat":14.700901,"lon":120.989522,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Fortune","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Parada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2303},{"i":3041,"cid":"21OD0194","pid":"P00525799LZ","t":"Construction of  Drainage Systems along Barangay 82,83,84,85, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":19149003.85,"abc":19599818.99,"fy":"2021","sd":"02/24/2022","cd":"2022-09-13","lat":14.65781,"lon":120.98966,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"82","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2304},{"i":3042,"cid":"23OC0082","pid":"P00726815LZ","t":"Construction of Box Culvert with Revetment along Coastal Road (San Dionisio Section, Phase I), Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":57900000.0,"abc":57900000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-12-15","lat":14.500507,"lon":120.989695,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2305},{"i":3043,"cid":"24CD0012","pid":"P00820824LZ","t":"Construction of Flood Control Structure along Santa Maria River and its Tributaries (Balasing-Pulong Buhangin Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":47520712.83,"abc":48249276.91,"fy":"2024","sd":"04/08/2024","cd":"2025-02-05","lat":14.843909,"lon":120.989697,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":2.17,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3026,3033],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0010 to 24CD0012) cover the same site, together worth PHP 146,512,589.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":548},{"i":3044,"cid":"22OE0023","pid":"P00620094LZ","t":"Installation of Automatic Trash Screen & Horizontal Conveyor at Estero de San Miguel at Nepomuceno St. (Phase III), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":65691762.9,"abc":67549374.91,"fy":"2022","sd":"04/01/2022","cd":"2022-11-22","lat":14.5933,"lon":120.98978,"sm":null,"fm":null,"tm":null,"am":1336,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59329,120.98978],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[3045,3071,3046],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OE0023 to 22OE0026) cover the same site, together worth PHP 335,664,202.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":426},{"i":3045,"cid":"22OE0024","pid":"P00620099LZ","t":"Installation of Booster Pump including Retarding Basin along Estero de San Miguel at Nepomuceno St. (Phase I), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":91669837.5,"abc":91669918.39,"fy":"2022","sd":"02/18/2022","cd":"2023-04-13","lat":14.59333,"lon":120.98978,"sm":null,"fm":null,"tm":null,"am":1336,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59329,120.98979],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[3046],"run":[3044,3071,3046],"cl":[],"L":"field","s":55,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 180,684,010.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OE0023 to 22OE0026) cover the same site, together worth PHP 335,664,202.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":75},{"i":3046,"cid":"22OE0026","pid":"P00620096LZ","t":"Installation of Booster Pump including Accessories along Estero de San Miguel at Nepomuceno St. (Phase II), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":89014172.0,"abc":91672699.66,"fy":"2022","sd":"02/17/2022","cd":"2022-11-22","lat":14.59333,"lon":120.98978,"sm":null,"fm":null,"tm":null,"am":1336,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59329,120.98979],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[3045],"run":[3044,3045,3071],"cl":[],"L":"field","s":54,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 180,684,010.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OE0023 to 22OE0026) cover the same site, together worth PHP 335,664,202.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":81},{"i":3047,"cid":"22CD0155","pid":"P00621277LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 12+700 - Sta. 13+000, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":61485086.19,"abc":61490589.09,"fy":"2022","sd":"03/30/2022","cd":"2023-02-28","lat":15.2217,"lon":120.98979,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.03,"wp":[15.22154,120.98999],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,2323,3520,3061,3096,3476],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":427},{"i":3048,"cid":"21OC0165","pid":"P00561612LZ","t":"Rehabilitation/Upgrading and Drainage Improvement Along A. Bonifacio St. and Its Vicinity (From Moras St., Mamante St., Romero St., Moras St. to NT Garcia Going to Quirino Avenue,) Barangay San Dionisio, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"M.P.Z. CARREON BUILDERS","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"12/31/2021","cd":"2022-09-02","lat":14.497355,"lon":120.989911,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2306},{"i":3049,"cid":"24OC0143","pid":"P00843171LZ","t":"Construction of Drainage System along Bonifacio St., Barangay San Dionisio, Paranaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4821756.02,"abc":4825000.0,"fy":"2024","sd":"06/27/2024","cd":"2024-10-23","lat":14.49457,"lon":120.989929,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2307},{"i":3050,"cid":"22OI0039","pid":"P00620905LZ","t":"Construction of Flood Control Structure at Las Piñas River and Its Tributaries, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":48996127.94,"abc":48997127.94,"fy":"2022","sd":"02/09/2022","cd":"2023-04-08","lat":14.452557,"lon":120.990022,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Las Piñas","wn":"Las Piñas River","wd":0.34,"wp":[14.45559,120.99045],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2308},{"i":3051,"cid":"23OC0096","pid":"P00726816LZ","t":"Construction of Revetment along Fisherman's Wharf (Phase I), Barangay La Huerta, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"REND ENTERPRISES & GENERAL CONTRACTOR / MRRM TRADING & CONSTRUCTION","c":77199892.17,"abc":77200000.0,"fy":"2023","sd":"07/10/2023","cd":"2024-09-14","lat":14.502039,"lon":120.990093,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Huerta","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2309},{"i":3052,"cid":"21OD0132","pid":"P00561467LZ","t":"Constuction of Flood Control Wall along Meycauyan River, Barangay Bignay, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"City of Valenzuela","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":94052821.99,"abc":96465358.98,"fy":"2021","sd":"11/11/2021","cd":"2022-10-05","lat":14.746173,"lon":120.990179,"sm":436,"fm":null,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Meycauyan","wn":"Meycauayan River","wd":0.01,"wp":[14.74625,120.9902],"wst":"matched","br":"Bignay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2310},{"i":3053,"cid":"24OD0029","pid":"P00820063LZ","t":"Construction of Reinforced Concrete Box Culvert along 8th Street, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":94183044.21,"abc":96495500.04,"fy":"2024","sd":"02/14/2024","cd":"2024-12-09","lat":14.648562,"lon":120.990219,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2311},{"i":3054,"cid":"23OI0033","pid":"P00725912LZ","t":"Construction of Flood Control Structure, Las Piñas River and Its Tributaries, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":48998566.62,"abc":48999721.32,"fy":"2023","sd":"02/13/2023","cd":"2023-12-10","lat":14.454667,"lon":120.990362,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Las Piñas","wn":"Las Piñas River","wd":0.1,"wp":[14.45559,120.99045],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2312},{"i":3055,"cid":"22OE0035","pid":"P00620017LZ","t":"Construction Drainage Structures along A. Maceda St. including its Tributaries, Manila city","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96474444.67,"abc":96498802.76,"fy":"2022","sd":"04/01/2022","cd":"2023-12-15","lat":14.62242,"lon":120.990366,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":16},{"i":3056,"cid":"22OH0021","pid":"P00620068LZ","t":"Drainage Improvement along Remedios St. from Remedios Circle to Singalong St., Malate, Manila Phase III","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"N.M.E. CONSTRUCTION","c":51209204.28,"abc":51225094.97,"fy":"2022","sd":"02/28/2022","cd":"2022-10-04","lat":14.572446,"lon":120.990404,"sm":892,"fm":null,"tm":892,"am":892,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2313},{"i":3057,"cid":"24OC0119","pid":"P00845867LZ","t":"Construction of Drainage System along A. Bonifacio St., Brgy. San Dionisio, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4949123.97,"abc":4950000.0,"fy":"2024","sd":"06/07/2024","cd":"2024-12-10","lat":14.495933,"lon":120.990409,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Dionisio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2314},{"i":3058,"cid":"22OE0088","pid":"P00620424LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de San Miguel, Barangay 389 Phase II, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EL-JAKE BUILDERS","c":44914073.11,"abc":46883166.09,"fy":"2022","sd":"02/23/2022","cd":"2022-09-24","lat":14.5976,"lon":120.9906,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.5976,120.9906],"wst":"matched","br":"389 Phase II","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":17},{"i":3059,"cid":"25OE0030","pid":"P00920012LZ","t":"Installation of Booster Pump at Estero de San Miguel, Package 1b, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / GENECOR CONSTRUCTION SUPPLIES TRADING","c":94675499.87,"abc":96499337.35,"fy":"2025","sd":"02/12/2025","cd":"2025-05-22","lat":14.597053,"lon":120.990623,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59704,120.99058],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":18},{"i":3060,"cid":"22OE0126","pid":"P00620002LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de San Miguel, Sta. 1+114.30 to Sta. 1+160; Sta. 1+245 to Sta. 1+460, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION / ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":79252428.01,"abc":79273745.93,"fy":"2022","sd":"02/24/2022","cd":"2022-10-21","lat":14.598048,"lon":120.9907,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59806,120.99068],"wst":"matched","br":null,"len":260.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":19},{"i":3061,"cid":"22CD0158","pid":"P00639340LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 13+000 - Sta. 13+ 600, Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96498941.25,"abc":96499481.76,"fy":"2022","sd":"03/30/2022","cd":"2023-05-26","lat":15.22528,"lon":120.9907,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.0,"wp":[15.22528,120.9907],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,3047,2323,3520,3096,3476],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":272},{"i":3062,"cid":"24CE0160","pid":"P00823446LZ","t":"Construction of Flood Control Structure along Talavera River (Package 1), Barangay Florida Blanca, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":47877326.45,"abc":48250000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-07-25","lat":15.682667,"lon":120.990996,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.07,"wp":[15.68269,120.99164],"wst":"matched","br":"Florida Blanca","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2315},{"i":3063,"cid":"22OC0060","pid":"P00620109LZ","t":"Proposed Construction of Box Culvert with Revetment Wall/Sheetpiling along Coastal Road (North Side), District I, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"J.H. PAJARA CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-09-23","lat":14.505117,"lon":120.99103,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2316},{"i":3064,"cid":"22OH0016","pid":"P00620088LZ","t":"Improvement/Rehabilitation/Replacement of Damaged Libertad Drainage Main (Box Culvert), Pasay City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":64455785.31,"abc":64537042.72,"fy":"2022","sd":"02/28/2022","cd":"2022-09-19","lat":14.545393,"lon":120.991085,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2317},{"i":3065,"cid":"23EB0036","pid":"P00726600LZ","t":"Construction of Flood Control Structure along Lumintao River from Boricotcot to Sitio Marilao, New Dagupan, Sta. 0+000 - Sta. 0+946, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":96496274.13,"abc":96500000.0,"fy":"2023","sd":"05/26/2023","cd":"2024-01-21","lat":12.52628,"lon":120.9911,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.15,"wp":[12.52505,120.9905],"wst":"matched","br":null,"len":946.0,"ph":null,"dup":[],"run":[2969,4447],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23EB0036 to 23EB0039) cover the same site, together worth PHP 242,134,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":273},{"i":3066,"cid":"24CE0161","pid":"P00823448LZ","t":"Construction of Flood Control Structure along Talavera River (Package 2), Barangay Florida Blanca, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":47758280.53,"abc":48250000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-07-25","lat":15.68111,"lon":120.991113,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.06,"wp":[15.68113,120.9917],"wst":"matched","br":"Florida Blanca","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2318},{"i":3067,"cid":"23OE0010","pid":"P00725505LZ","t":"Installation of Booster Pump at P. Casal Bridge (Phase II) at Estero de San Miguel, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93353753.52,"abc":95993331.2,"fy":"2023","sd":"02/16/2023","cd":"2023-09-18","lat":14.599591,"lon":120.991165,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.59959,120.99116],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":20},{"i":3068,"cid":"23OD0103","pid":"P00737399LZ","t":"Construction of Drainage System Along Tagaytay Street, Barangay 126, 127, 128, 129, and 130, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"NOVA VENTUS CONSTRUCTION INC.","c":14517055.98,"abc":14847267.53,"fy":"2023","sd":"03/17/2023","cd":"2023-11-10","lat":14.643794,"lon":120.991215,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"126","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2319},{"i":3069,"cid":"22OE0168","pid":"P00621410LZ","t":"Construction of Retarding Basin at Estero de San Miguel, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48781885.7,"abc":48999544.44,"fy":"2022","sd":"05/31/2022","cd":"2023-05-14","lat":14.59985,"lon":120.99134,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.01,"wp":[14.59988,120.99125],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":21},{"i":3070,"cid":"22OE0004","pid":"P00620098LZ","t":"Installation of Booster Pump including Retarding Basin along Estero de San Miguel at Mendiola St. (Phase I), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":90964722.8,"abc":91672362.7,"fy":"2022","sd":"02/17/2022","cd":"2023-04-20","lat":14.60012,"lon":120.991441,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.01,"wp":[14.60015,120.99135],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[3071],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 180,253,152.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":804},{"i":3071,"cid":"22OE0025","pid":"P00620095LZ","t":"Installation of Booster Pump including Accessories along Estero de San Miguel at Mendiola St. (Phase II), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / LDC CONSTRUCTION AND SUPPLY, INC. (FORMERLY:LDC CONSTRUCTION AND SUPPLY)","c":89288429.57,"abc":91671685.63,"fy":"2022","sd":"02/28/2022","cd":"2023-05-05","lat":14.60012,"lon":120.991441,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.01,"wp":[14.60015,120.99135],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[3070],"run":[3044,3045,3046],"cl":[],"L":"field","s":55,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 180,253,152.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OE0023 to 22OE0026) cover the same site, together worth PHP 335,664,202.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":76},{"i":3072,"cid":"23OE0041","pid":"P00726007LZ","t":"Construction of Retention Basin along Estero de San Miguel, Phase I (Mendiola Section), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":34724638.04,"abc":34784050.9,"fy":"2023","sd":"02/17/2023","cd":"2024-01-13","lat":14.600339,"lon":120.991457,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.0,"wp":[14.60035,120.99142],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":22},{"i":3073,"cid":"24CE0159","pid":"P00823447LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Villa Viniegas, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES / SYMMETRICON BUILDERS CORP.","c":47767457.52,"abc":48250000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-31","lat":15.686028,"lon":120.991497,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.07,"wp":[15.68553,120.99182],"wst":"matched","br":"Villa Viniegas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2320},{"i":3074,"cid":"22OD0087","pid":"P00631033LZ","t":"Construction of Retaining Wall with Drainage along Canumay East MPB, Brgy. Canumay East, Valenzuela","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":8650547.65,"abc":8818109.85,"fy":"2022","sd":"02/08/2022","cd":"2022-08-05","lat":14.716987,"lon":120.991694,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canumay East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2321},{"i":3075,"cid":"23OC0097","pid":"P00726817LZ","t":"Construction of Revetment along Fisherman's Wharf (Phase II), Barangay La Huerta, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":77194055.8,"abc":77200000.0,"fy":"2023","sd":"07/10/2023","cd":"2024-09-13","lat":14.502079,"lon":120.991701,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Huerta","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2322},{"i":3076,"cid":"23CF0045","pid":"P00727298LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sto. Tomas, Peñaranda, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN ANTONIO (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"ITP CONSTRUCTION, INC.","c":94475987.07,"abc":96499998.94,"fy":"2023","sd":"03/23/2023","cd":"2023-07-17","lat":15.36618,"lon":120.99179,"sm":1119,"fm":1256,"tm":1119,"am":1119,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.0,"wp":[15.36618,120.99179],"wst":"matched","br":"Sto. Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":12.23,"text":"The record contradicts itself: the title and the pin point to Peñaranda, Nueva Ecija, but the municipality field names San Antonio, Nueva Ecija, 12 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":474},{"i":3077,"cid":"24C00086","pid":"P00821230LZ","t":"Construction of Flood Control Structure along Maasim River (Package VI), Barangay Basuit, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"ADSL CONSTRUCTION & TRADING","c":96498717.18,"abc":96498109.54,"fy":"2024","sd":"05/06/2024","cd":"2025-03-01","lat":15.02739,"lon":120.991905,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":6.56,"wp":[15.03715,120.93179],"wst":"matched","br":"Basuit","len":null,"ph":"Package VI","dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.56,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 6.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":245},{"i":3078,"cid":"23PI0093","pid":"P00726659LZ","t":"Construction of Fengar Flood Control, Sta. 33 + 220- Sta. 33 + 470 (RS) along Agkuyo-Chico River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"KOMICHOV GENERAL CONSTRUCTION","c":29400000.0,"abc":29399999.9,"fy":"2023","sd":"08/14/2023","cd":"2023-11-30","lat":17.06,"lon":120.99194,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Agkuyo-Chico","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":516},{"i":3079,"cid":"24OE0127","pid":"P00844683LZ","t":"Construction of Reinforced Concrete Box Culvert along MF Jhocson St. (España Blvd to SH Loyola St.), Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"V.R. GUEVARRA CONSTRUCTION AND TRADING","c":28396675.51,"abc":29399646.31,"fy":"2024","sd":"02/08/2024","cd":"2024-08-16","lat":14.607041,"lon":120.992139,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":23},{"i":3080,"cid":"22OE0147","pid":"P00620065LZ","t":"Drainage Improvement along Arlegui St. and Vicinity, including Installation of Pumping Station, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":88388729.18,"abc":91674489.78,"fy":"2022","sd":"02/23/2022","cd":"2023-06-15","lat":14.596615,"lon":120.992246,"sm":null,"fm":null,"tm":null,"am":1336,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":24},{"i":3081,"cid":"22OC0059","pid":"P00620368LZ","t":"Improvement / Slope Protection of San Dionisio River Phase II, District I, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":48995853.71,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-01","lat":14.488711,"lon":120.992266,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"San Dionisio","wn":"San Dionisio Creek","wd":0.01,"wp":[14.48865,120.99233],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2323},{"i":3082,"cid":"23OE0052","pid":"P00726008LZ","t":"Construction of Retention Basin along Estero de San Miguel, Phase II (Earnshaw Drainage Main Outfall), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":34233809.58,"abc":34784087.93,"fy":"2023","sd":"02/17/2023","cd":"2024-08-15","lat":14.600613,"lon":120.992643,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.01,"wp":[14.60054,120.99266],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":25},{"i":3083,"cid":"23OI0028","pid":"P00725914LZ","t":"Construction of Flood Control Structure, Balihatar Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":48994961.38,"abc":48998210.02,"fy":"2023","sd":"02/13/2023","cd":"2023-08-11","lat":14.482826,"lon":120.992697,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Balihatar","wn":"Balihatar Creek","wd":0.0,"wp":[14.48282,120.99271],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2324},{"i":3084,"cid":"20OC0135","pid":"P00421301LZ","t":"Construction of Revetment Wall/Sheetpiling of Baclaran Channel Channel, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":96500000.0,"abc":98000000.0,"fy":"2020","sd":"11/25/2020","cd":"2022-10-24","lat":14.531511,"lon":120.992754,"sm":411,"fm":null,"tm":411,"am":1107,"md":0.01,"ls":"boundary","ww":"Baclaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2325},{"i":3085,"cid":"20OC0135","pid":"P00421301LZ","t":"Construction of Revetment Wall/Sheetpiling of Baclaran Channel Channel, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":96500000.0,"abc":98000000.0,"fy":"2021","sd":"11/25/2020","cd":"2022-10-24","lat":14.531511,"lon":120.992754,"sm":411,"fm":null,"tm":411,"am":1107,"md":0.01,"ls":"boundary","ww":"Baclaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2326},{"i":3086,"cid":"24OC0037","pid":"P00820567LZ","t":"Construction of Revetment along San Dionisio River (Phase III), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ILFREO CONSTRUCTION CORP. (FORMERLY:ILFREO CONSTRUCTION & TRADING CORP.)","c":48606719.37,"abc":48625580.0,"fy":"2024","sd":"02/07/2024","cd":"2024-09-18","lat":14.48982,"lon":120.99276,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"San Dionisio","wn":"San Dionisio Creek","wd":0.02,"wp":[14.48983,120.99295],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2327},{"i":3087,"cid":"21OE0139","pid":"P00525828LZ","t":"Rehabilitation of RCPC along Lardizabal Street, Sta.0+000 to Sta.0+266.00 and Sta. 0+000.00 to Sta.0+369.00, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.)","c":46793689.84,"abc":48999472.53,"fy":"2021","sd":"06/28/2021","cd":"2022-10-20","lat":14.60189,"lon":120.992789,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":635.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":26},{"i":3088,"cid":"24OE0117","pid":"P00844682LZ","t":"Construction of Reinforced Concrete Box Culvert along Cayco St. (España Blvd to SH Loyola St.), Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"V.R. GUEVARRA CONSTRUCTION AND TRADING","c":28729795.19,"abc":29399950.39,"fy":"2024","sd":"02/12/2024","cd":"2024-10-28","lat":14.607466,"lon":120.992821,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":27},{"i":3089,"cid":"22OD0067","pid":"P00637043LZ","t":"Construction of Drainage along Brgy. 97, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"C.L. MORALES CONSTRUCTION AND TRADING","c":7193608.46,"abc":7348947.58,"fy":"2022","sd":"03/24/2022","cd":"2022-12-07","lat":14.651269,"lon":120.992957,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"97","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2328},{"i":3090,"cid":"23OH0046","pid":"P00726795LZ","t":"Construction of Flood Control/Box Culvert Drainage System, San Andres St., Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALE BUILDERS CONSTRUCTION AND DEVELOPMENT CORP.","c":48240996.26,"abc":48249544.03,"fy":"2023","sd":"04/20/2023","cd":"2024-04-15","lat":14.570709,"lon":120.993116,"sm":null,"fm":null,"tm":null,"am":892,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":28},{"i":3091,"cid":"24OD0062","pid":"P00839527LZ","t":"Rehabilitation of Drainage System, Tirad Pass, Barangay 136, Caloocan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":4869448.78,"abc":4943610.73,"fy":"2024","sd":"02/14/2024","cd":"2024-05-13","lat":14.659614,"lon":120.993197,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"136","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2329},{"i":3092,"cid":"23OC0100","pid":"P00726818LZ","t":"Construction of Revetment along Fisherman's Wharf (Phase III), Barangay La Huerta, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AARCON BUILDERS","c":67543629.01,"abc":67550000.0,"fy":"2023","sd":"07/20/2023","cd":"2024-12-03","lat":14.501826,"lon":120.993277,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Huerta","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2330},{"i":3093,"cid":"23DQ0045","pid":"P00726571LZ","t":"Construction of Revetment along San Isidro River, Phase 1, Barangay Maderan, General Mariano Alvarez, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.","c":96499372.38,"abc":96499951.51,"fy":"2023","sd":"04/10/2023","cd":"2024-10-05","lat":14.28559,"lon":120.99357,"sm":570,"fm":570,"tm":570,"am":382,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":20.82,"wp":[14.47354,121.00247],"wst":"matched","br":"Maderan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2331},{"i":3094,"cid":"24OE0115","pid":"P00820619LZ","t":"Construction of Drainage System along Espana Boulevard, Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.)","c":29396831.65,"abc":29399964.56,"fy":"2024","sd":"02/08/2024","cd":"2024-12-14","lat":14.610427,"lon":120.99371,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":29},{"i":3095,"cid":"23OC0042","pid":"P00737393LZ","t":"Construction of Drainage System at Bayview Drive, Barangay Tambo, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":5940000.0,"abc":5940000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.52062,"lon":120.993727,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2332},{"i":3096,"cid":"22CD0159","pid":"P00639341LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 13+600 - Sta. 14+200, Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96496520.01,"abc":96499438.31,"fy":"2022","sd":"03/30/2022","cd":"2023-05-26","lat":15.22713,"lon":120.99379,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.01,"wp":[15.22718,120.9938],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,3047,2323,3520,3061,3476],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":274},{"i":3097,"cid":"24OH0038","pid":"P00820016LZ","t":"Construction of Drainage System along Libertad Main (From Roxas Blvd to FB Harrison), Pasay City, Phase 3","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AARCON BUILDERS","c":89163791.72,"abc":89170822.17,"fy":"2024","sd":"02/20/2024","cd":"2024-11-15","lat":14.546143,"lon":120.993859,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2333},{"i":3098,"cid":"23OC0114","pid":"P00726819LZ","t":"Construction of Revetment along Fisherman's Wharf (Phase IV), Barangay La Huerta, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AARCON BUILDERS","c":67549911.44,"abc":67550000.0,"fy":"2023","sd":"09/11/2023","cd":"2024-11-05","lat":14.500777,"lon":120.99405,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Huerta","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2334},{"i":3099,"cid":"22OI0116","pid":"P00637033LZ","t":"Rehabilitation of Road and Drainage System at Brgy. Talon 5, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"FIRST METSTEEL BUILDERS","c":4899836.7,"abc":4899999.92,"fy":"2022","sd":"05/27/2022","cd":"2022-08-12","lat":14.418242,"lon":120.994065,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talon 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2335},{"i":3100,"cid":"24OH0051","pid":"P00820060LZ","t":"Construction of Pumping Station, Apacible Street along Estero de Paco, Brgy. 673, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JIM AND JEM CONSTRUCTION SERVICES","c":96490182.48,"abc":96499885.03,"fy":"2024","sd":"03/13/2024","cd":"2024-09-08","lat":14.581097,"lon":120.994071,"sm":null,"fm":null,"tm":null,"am":1048,"md":null,"ls":"unknown","ww":"de Paco","wn":"Estero de Paco","wd":0.3,"wp":[14.57838,120.99379],"wst":"matched","br":"673","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":30},{"i":3101,"cid":"22OI0113","pid":"P00631007LZ","t":"Rehabilitation of Drainage System, Brgy. Talon 2, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"DAVHEZ TRADING & CONSTRUCTION","c":18619999.97,"abc":19599999.97,"fy":"2022","sd":"05/27/2022","cd":"2022-11-22","lat":14.444404,"lon":120.99411,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talon 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2336},{"i":3102,"cid":"22OI0030","pid":"P00620912LZ","t":"Construction of Flood Control Structure, Manarigo Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":48998963.41,"abc":48999978.6,"fy":"2022","sd":"02/09/2022","cd":"2022-10-06","lat":14.452345,"lon":120.99414,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Manarigo","wn":"Manarigo Creek","wd":0.0,"wp":[14.45232,120.99413],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2337},{"i":3103,"cid":"25OE0103","pid":"P00941129LZ","t":"Rehabilitation of Drainage Structure, Phase 5, Zone 41-57, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"LE BRON CONSTRUCTION","c":4798989.63,"abc":4949922.56,"fy":"2025","sd":"02/17/2025","cd":"2025-04-21","lat":14.608914,"lon":120.994234,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":31},{"i":3104,"cid":"23OE0058","pid":"P00740279LZ","t":"Construction of Retention Basin along Estero de Calubcob Phase IV, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / MANGEN TECHNO-BUILDERS INC.","c":47875326.9,"abc":48999612.49,"fy":"2023","sd":"03/28/2023","cd":"2024-02-20","lat":14.613187,"lon":120.994238,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Calubcob Phase IV","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":32},{"i":3105,"cid":"22OC0054","pid":"P00620027LZ","t":"Construction of Flood Mitigation Structures (Installation of Booster Pump) and Groundsill at Marulas Creek, District 1, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":95715093.42,"abc":95749230.0,"fy":"2022","sd":"05/19/2022","cd":"2023-05-13","lat":14.477533,"lon":120.994319,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Marulas","wn":"Marulas Creek","wd":0.19,"wp":[14.47628,120.9931],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2338},{"i":3106,"cid":"24OE0020","pid":"P00820072LZ","t":"Construction of Retention Basin along Estero de Calubcob Phase V, Manila City","w":"Construction of Retarding Basin","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / RJR CALCON CORP.","c":88345999.39,"abc":90338911.19,"fy":"2024","sd":"02/08/2024","cd":"2024-09-10","lat":14.613701,"lon":120.99433,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Calubcob Phase V","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":33},{"i":3107,"cid":"23CD0065","pid":"P00725724LZ","t":"Construction of Flood Control Structure, Dulong Bayan (Phase III), City of San jose Del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96496572.72,"abc":96499994.92,"fy":"2023","sd":"03/01/2023","cd":"2023-10-16","lat":14.83378,"lon":121.03713,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2339},{"i":3108,"cid":"22DQ0008","pid":"P00620224LZ","t":"Construction of Revetment along Carmona River, Brgy. Cabilang Baybay, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION / OMNICON BUILDERS","c":86833934.73,"abc":86849972.69,"fy":"2022","sd":"03/07/2022","cd":"2022-07-22","lat":14.31815,"lon":121.04902,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.6,"wp":[14.31106,121.06192],"wst":"matched","br":"Cabilang Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2340},{"i":3109,"cid":"22CD0085","pid":"P00631221LZ","t":"Construction of Flood Control Structure, Barangay Dulong Bayan, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":44098986.56,"abc":44099923.15,"fy":"2022","sd":"03/31/2022","cd":"2023-03-19","lat":14.83222,"lon":121.03722,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dulong Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2341},{"i":3110,"cid":"23OE0199","pid":"P00726775LZ","t":"Construction of Retention Basin at Estero dela Reina (Phase XV), Tondo, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":94814590.39,"abc":96499915.79,"fy":"2023","sd":"03/14/2023","cd":"2024-11-15","lat":14.61529,"lon":120.971004,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61529,120.97099],"wst":"matched","br":null,"len":null,"ph":"Phase XV","dup":[],"run":[3977,3166,3114,3128,3175,3180,3134,3143],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":328},{"i":3111,"cid":"24OD0184","pid":"P00844681LZ","t":"Construction of Drainage System, Union Workers, Barangay 167, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SAN IGMEDIO BUILDERS INCORPORATED","c":9625479.55,"abc":9796941.19,"fy":"2024","sd":"03/26/2024","cd":"2024-05-24","lat":14.734913,"lon":121.014831,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"167","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2342},{"i":3112,"cid":"22OE0021","pid":"P00620059LZ","t":"Construction of Additional Booster Pump along Estero de Calubcob including Accessories, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96494451.74,"abc":96499979.57,"fy":"2022","sd":"04/01/2022","cd":"2023-02-10","lat":14.615507,"lon":120.994643,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Calubcob","wn":"Estero de Calubcob","wd":0.03,"wp":[14.61521,120.99456],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":34},{"i":3113,"cid":"23DQ0068","pid":"P00742183LZ","t":"Construction of River Bank Protection Works along Zapote River at Brgy Molino, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98973782.96,"abc":98999935.41,"fy":"2023","sd":"05/01/2023","cd":"2024-02-16","lat":14.41875,"lon":120.97731,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":1.12,"wp":[14.42267,120.98685],"wst":"matched","br":"Molino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2343},{"i":3114,"cid":"23OE0192","pid":"P00726777LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase XIV, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":71687670.79,"abc":72374420.52,"fy":"2023","sd":"03/10/2023","cd":"2023-06-23","lat":14.614328,"lon":120.971066,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61433,120.97104],"wst":"matched","br":null,"len":null,"ph":"Phase XIV","dup":[3128,3134,3143],"run":[3977,3166,3128,3175,3180,3134,3143,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 285,992,667.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":31},{"i":3115,"cid":"21OC0144","pid":"P00525761LZ","t":"Rehabilitation and Improvement of Villanueva Creek, Valley 2 to Valley 15 Section, Brgy. San Isidro, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":19593918.94,"abc":19600000.0,"fy":"2021","sd":"02/22/2022","cd":"2022-10-01","lat":14.470555,"lon":121.004557,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.52,"wp":[14.47285,121.00875],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3168,3195,3199,3460,3475,3631,3748,3825,3908,3914],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1075},{"i":3116,"cid":"23OF0008","pid":"P00726012LZ","t":"Construction of Flood Control Structure at San Francisco River, Barangay Talayan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT","c":19000000.0,"abc":19599970.3,"fy":"2023","sd":"02/13/2023","cd":"2023-07-17","lat":14.632451,"lon":121.014939,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.01,"wp":[14.63254,121.01499],"wst":"matched","br":"Talayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2344},{"i":3117,"cid":"22OD0158","pid":"P00637046LZ","t":"Construction of Retaining Wall and Drainage at Displina Village, Lingunan, Brgy. Lingunan, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":9540007.71,"abc":9794679.28,"fy":"2022","sd":"03/24/2022","cd":"2022-11-17","lat":14.713194,"lon":120.977326,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lingunan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2345},{"i":3118,"cid":"23DI0150","pid":"P00725825LZ","t":"Construction of Flood Protection Structure Phase 3, (Biñan-Carmona Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":96447141.02,"abc":96500000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-03-15","lat":14.256456,"lon":121.037239,"sm":371,"fm":371,"tm":371,"am":1455,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2346},{"i":3119,"cid":"24CD0009","pid":"P00821578LZ","t":"Construction of Flood Control Structure along Angat River and its Tributaries, Poblacion-Matictic Section (leading to Bakas), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48999846.44,"abc":48999499.15,"fy":"2024","sd":"03/21/2024","cd":"2024-10-01","lat":14.904758,"lon":121.049036,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.3,"wp":[14.90659,121.05111],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2347},{"i":3120,"cid":"23CD0022","pid":"P00726725LZ","t":"Construction of Flood Control Structure along Meycauayan River and its Tributaries (Longos - Bayugo Section) Sta. 00+000 - Sta. 00+200, Meycauayan Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":48996528.42,"abc":48998969.45,"fy":"2023","sd":"02/22/2023","cd":"2023-07-11","lat":14.723433,"lon":120.956464,"sm":406,"fm":406,"tm":null,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.91,"wp":[14.73091,120.96007],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[3437,2655,2736,3793],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23CD0021 to 23CD0025) cover the same site, together worth PHP 264,356,660.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":520},{"i":3121,"cid":"24OH0039","pid":"P00820017LZ","t":"Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 161 to Sta 0 + 322), Phase 4","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":89077443.18,"abc":89171676.23,"fy":"2024","sd":"02/20/2024","cd":"2024-10-14","lat":14.54649,"lon":120.994948,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":161.0,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2348},{"i":3122,"cid":"24CF0046","pid":"P00845999LZ","t":"Construction of Drainage Canal, Brgy. Kapitan Pepe Cabanatuan City, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":4873904.4,"abc":4949906.87,"fy":"2024","sd":"03/20/2024","cd":"2024-07-26","lat":15.48035,"lon":120.95647,"sm":272,"fm":272,"tm":null,"am":272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kapitan Pepe Cabanatuan City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2349},{"i":3123,"cid":"21OE0047","pid":"P00525817LZ","t":"Bank Improvement along Estero de Maypajo, Sta. 0+905.2 to Sta. 0+989.20, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":19567913.35,"abc":19599263.46,"fy":"2021","sd":"03/29/2022","cd":"2022-10-21","lat":14.63559,"lon":120.977375,"sm":null,"fm":null,"tm":null,"am":308,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.92,"wp":[14.63731,120.96904],"wst":"matched","br":null,"len":84.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":35},{"i":3124,"cid":"24OE0058","pid":"P00820011LZ","t":"Construction of Drainage along Lubiran St., Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. / EVERCORE CONSTRUCTION AND DEVELOPMENT CORP.","c":85548671.84,"abc":85550000.31,"fy":"2024","sd":"02/13/2024","cd":"2025-02-14","lat":14.595751,"lon":121.015044,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":36},{"i":3125,"cid":"21OC0045","pid":"P00525756LZ","t":"Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 3), Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29397313.67,"abc":29400000.0,"fy":"2021","sd":"03/22/2022","cd":"2022-10-07","lat":14.470432,"lon":121.037276,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.8,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[3152,3172,3299,3393,3891,3934,3983],"L":"field","s":17,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1114},{"i":3126,"cid":"22OC0038","pid":"P00620389LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along San Nicolas St., San Nicolas Ext'n, and its Vicinity, Brgy. Guadalupe Nuevo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"THE STEADFAST BUILDERS","c":17640000.0,"abc":17640000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-07-03","lat":14.562744,"lon":121.049123,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Nuevo","len":null,"ph":null,"dup":[],"run":[3381,3384],"cl":[],"L":"field","s":30,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0034 to 22OC0038) cover the same site, together worth PHP 47,011,876.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":666},{"i":3127,"cid":"24OF0064","pid":"P00824616LZ","t":"Construction of Drainage Systems at Jem 9, Brgy. Tandang Sora, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":19598545.53,"abc":19599657.88,"fy":"2024","sd":"02/23/2024","cd":"2024-06-25","lat":14.684905,"lon":121.0373,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2350},{"i":3128,"cid":"23OE0193","pid":"P00726778LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase XV, Tondo Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":70540676.21,"abc":72374399.73,"fy":"2023","sd":"03/10/2023","cd":"2023-08-22","lat":14.614328,"lon":120.971066,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61433,120.97104],"wst":"matched","br":null,"len":null,"ph":"Phase XV","dup":[3114,3134,3143],"run":[3977,3166,3114,3175,3180,3134,3143,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 285,992,667.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":32},{"i":3129,"cid":"22DQ0006","pid":"P00620895LZ","t":"Construction of Slope Protection along Imus River (Tributary to Manila Bay), Brgy. H-2 to Brgy. San Manuel, Dasmariñas City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":94569855.64,"abc":94569938.4,"fy":"2022","sd":"03/02/2022","cd":"2023-11-20","lat":14.32845,"lon":120.95648,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.01,"wp":[14.32843,120.95642],"wst":"matched","br":"H-2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2351},{"i":3130,"cid":"24OE0072","pid":"P00820620LZ","t":"Construction of Drainage System along Morong Street, Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"AL-AMEN BUILDERS","c":48968908.87,"abc":48999335.68,"fy":"2024","sd":"02/07/2024","cd":"2025-01-18","lat":14.631261,"lon":120.977523,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":37},{"i":3131,"cid":"23OH0030","pid":"P00726035LZ","t":"Rehabilitation of Flood Mitigation Structure, Easement Road Estero de Pandacan (Tripa de Gallina - P. Quirino Ave.) Manila","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":38253120.32,"abc":39194521.41,"fy":"2023","sd":"02/27/2023","cd":"2023-10-24","lat":14.58195,"lon":121.004675,"sm":null,"fm":null,"tm":null,"am":1369,"md":null,"ls":"unknown","ww":"de Pandacan","wn":"Estero de Pandacan","wd":0.0,"wp":[14.58197,121.00468],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":38},{"i":3132,"cid":"22BJ0044","pid":"P00640511LZ","t":"Construction of Flood Mitigation Structures along Sta. Fe River, BONE SOUTH Section, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":34138606.28,"abc":34300000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-29","lat":16.25033,"lon":121.01526,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":0.45,"wp":[16.24647,121.01668],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2352},{"i":3133,"cid":"21DQ0045","pid":"P00526324LZ","t":"Construction of Slope Protection along Imus River, Brgy. Santa Maria, Dasmariñas City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"City of Dasmariñas","deo":"Cavite 3rd District Engineering Office","co":"R2A CONSTRUCTION & TRADING CORPORATION","c":53637052.73,"abc":53644300.67,"fy":"2021","sd":"04/22/2021","cd":"2022-09-20","lat":14.32515,"lon":120.95659,"sm":382,"fm":null,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.32516,120.95661],"wst":"matched","br":"Santa Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2353},{"i":3134,"cid":"23OE0196","pid":"P00726781LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase XIII, District 1, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":72357606.57,"abc":72374776.28,"fy":"2023","sd":"03/10/2023","cd":"2023-06-23","lat":14.614328,"lon":120.971066,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61433,120.97104],"wst":"matched","br":null,"len":null,"ph":"Phase XIII","dup":[3114,3128,3143],"run":[3977,3166,3114,3128,3175,3180,3143,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 285,992,667.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":33},{"i":3135,"cid":"24OD0025","pid":"P00820595LZ","t":"Construction of Flood Control Wall along Sampaguita Creek, Barangay Marulas, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"RWORKMATE CONSTRUCTION","c":14401100.63,"abc":14695018.31,"fy":"2024","sd":"02/14/2024","cd":"2024-09-09","lat":14.679278,"lon":120.995217,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Sampaguita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marulas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2354},{"i":3136,"cid":"22OE0034","pid":"P00620032LZ","t":"Construction of RCBC along Pureza Street, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":64579690.5,"abc":67549240.33,"fy":"2022","sd":"02/23/2022","cd":"2023-06-11","lat":14.5986,"lon":121.00478,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":39},{"i":3137,"cid":"24OF0141","pid":"P00823258LZ","t":"Construction Drainage Systems at Brgy. Apolonio Samson, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":77199937.29,"abc":77199937.29,"fy":"2024","sd":"03/18/2024","cd":"2024-12-11","lat":14.656569,"lon":121.015263,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Apolonio Samson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2355},{"i":3138,"cid":"24CD0014","pid":"P00821580LZ","t":"Construction of Flood Control Structure along Angat River, Brgy. Laog, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249967.72,"abc":48249925.33,"fy":"2024","sd":"04/08/2024","cd":"2024-11-07","lat":14.919695,"lon":121.049416,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.05,"wp":[14.91936,121.04905],"wst":"matched","br":"Laog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2356},{"i":3139,"cid":"22OB0242","pid":"P00621406LZ","t":"Construction of Slope Protection along Ermitaño Creek, San Juan City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAWAO BUILDERS","c":18619991.16,"abc":19599999.95,"fy":"2022","sd":"03/24/2022","cd":"2023-01-08","lat":14.606472,"lon":121.037417,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Ermitaño","wn":"Ermitaño Creek","wd":0.01,"wp":[14.60657,121.03745],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2357},{"i":3140,"cid":"22D00085","pid":"P00639377LZ","t":"Construction of Slope Protection (River Drive), Molino 3 to San Nicolas 1 (Section) Phase 2, Bacoor City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":96499256.16,"abc":96500000.0,"fy":"2022","sd":"06/14/2022","cd":"2023-12-15","lat":14.4271,"lon":120.9776,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2358},{"i":3141,"cid":"23D00011","pid":"P00725818LZ","t":"Construction of River Control along San Pedro River (Phase 1), San Pedro, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":77199993.66,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-03-20","lat":14.342919,"lon":121.037561,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Pedro","wn":"San Pedro River","wd":0.01,"wp":[14.34292,121.03748],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2359},{"i":3142,"cid":"22OC0022","pid":"P00620373LZ","t":"Rehabilitation/ Upgrading and Drainage Improvement along Dapitan St., Dapitan Ext'n, and its Vicinity, Brgy. Guadalupe Nuevo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"THE STEADFAST BUILDERS","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-07-03","lat":14.562421,"lon":121.04962,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Nuevo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2360},{"i":3143,"cid":"23OE0197","pid":"P00726782LZ","t":"Installation of Booster Poump at Estero dela Reina, Phase XVI, District 1, Tondo Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":71406713.83,"abc":72374816.16,"fy":"2023","sd":"03/10/2023","cd":"2023-08-22","lat":14.614328,"lon":120.971066,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61433,120.97104],"wst":"matched","br":null,"len":null,"ph":"Phase XVI","dup":[3114,3128,3134],"run":[3977,3166,3114,3128,3175,3180,3134,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 285,992,667.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":34},{"i":3144,"cid":"22OG0119","pid":"P00637761LZ","t":"Rehabilitation and Drainage Input of Various Alleys, San Martin de Porres, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":7902183.52,"abc":7918304.49,"fy":"2022","sd":"05/18/2022","cd":"2022-12-06","lat":14.61845,"lon":121.04979,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2361},{"i":3145,"cid":"24OE0170","pid":"P00845872LZ","t":"Construction of Drainage System along Pilar Street, Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EL-JAKE BUILDERS / MANGEN TECHNO-BUILDERS INC.","c":49499821.11,"abc":49499898.64,"fy":"2024","sd":"02/12/2024","cd":"2024-11-11","lat":14.632915,"lon":120.977668,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":40},{"i":3146,"cid":"21OB0207","pid":"P00525720LZ","t":"Construction of Flood Control, Barangay Little Baguio, San Juan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"City of San Juan","deo":"Metro Manila 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":46495969.51,"abc":48999981.62,"fy":"2021","sd":"02/24/2022","cd":"2023-02-13","lat":14.606146,"lon":121.03771,"sm":417,"fm":null,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Little Baguio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2362},{"i":3147,"cid":"22OA0048","pid":"P00631019LZ","t":"Construction of Box-Culvert Drainage along Sanciangco St. (P. Aquino St. To Catmon Bridge), Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":49000000.0,"abc":48999950.85,"fy":"2022","sd":"02/15/2022","cd":"2024-04-11","lat":14.660388,"lon":120.956611,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2363},{"i":3148,"cid":"21OC0040","pid":"P00525754LZ","t":"Rehabilitation of Slope Protection, Balaraw Creek (Phase III), Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":19594378.86,"abc":19600000.0,"fy":"2021","sd":"03/22/2022","cd":"2022-09-22","lat":14.495699,"lon":121.015359,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Balaraw","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2364},{"i":3149,"cid":"24CE0163","pid":"P00823444LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Palestina, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":47767490.75,"abc":48250000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-08-01","lat":15.773156,"lon":121.004811,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.05,"wp":[15.77292,121.00437],"wst":"matched","br":"Palestina","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2365},{"i":3150,"cid":"22OC0008","pid":"P00620038LZ","t":"Construction of Revetment Wall Along Maricaban Creek Makati Side (Phase 6), Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":85780689.36,"abc":87455055.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":14.530996,"lon":121.015865,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.01,"wp":[14.5309,121.01581],"wst":"matched","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2366},{"i":3151,"cid":"24OD0006","pid":"P00820583LZ","t":"Construction of Drainage (Box Culvert) along Gold Eagle NLEX Service Road, Barangay Gen. T. De Leon, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":9454950.64,"abc":9796791.68,"fy":"2024","sd":"02/14/2024","cd":"2024-08-10","lat":14.69327,"lon":120.995406,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gen. T. De Leon","len":null,"ph":null,"dup":[],"run":[3011,3455],"cl":[],"L":"field","s":29,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OD0003 to 24OD0006) cover the same site, together worth PHP 28,354,810.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":679},{"i":3152,"cid":"19OC0091","pid":"P00320509LZ","t":"Rehabilitation/Upgrading of Drainage System at Gawad Kalinga, Brgy. Marcelo Green, Parañaque City, Metro Manila","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION)","c":13106844.5,"abc":14700000.0,"fy":"2019","sd":"10/10/2019","cd":"2022-11-14","lat":14.473656,"lon":121.037711,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marcelo Green","len":null,"ph":null,"dup":[],"run":[],"cl":[3125,3172,3299,3393,3891,3934,3983],"L":"field","s":15,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1137},{"i":3153,"cid":"23OH0023","pid":"P00725512LZ","t":"Construction of Drainage System (Box Culvert) along Andrew Avenue from Aurora Blvd. to Pasay Baclaran Boundary, Pasay City (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / AL-ALAWI CONSTRUCTION","c":53069305.41,"abc":53074994.96,"fy":"2023","sd":"02/22/2023","cd":"2024-02-22","lat":14.527973,"lon":121.00495,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2367},{"i":3154,"cid":"22OA0043","pid":"P00631024LZ","t":"Construction of R-10 Pumping Station, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"CATTECORYLL CONSTRUCTION & TRADING CORP","c":19597223.14,"abc":19599959.06,"fy":"2022","sd":"02/14/2022","cd":"2022-09-23","lat":14.635665,"lon":120.957136,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2368},{"i":3155,"cid":"22OD0014","pid":"P00620408LZ","t":"Construction of Flood Control Wall Hapay Ng Mangga, Brgy. Parada, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":23682211.61,"abc":24490415.28,"fy":"2022","sd":"02/08/2022","cd":"2022-09-12","lat":14.695862,"lon":120.995419,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Parada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2369},{"i":3156,"cid":"23OD0200","pid":"P00727017LZ","t":"Construction of Reinforced Box Culvert along C-3 Road, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MIGHTY CONSTRUCTION & DEVELOPMENT INC.","c":28732995.01,"abc":29397260.86,"fy":"2023","sd":"06/19/2023","cd":"2023-12-27","lat":14.638244,"lon":120.977676,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2370},{"i":3157,"cid":"24OF0096","pid":"P00824620LZ","t":"Construction of Flood Mitigation Structures and Drainage Systems at Brgy. Tandang Sora, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":38768477.84,"abc":39199674.26,"fy":"2024","sd":"02/27/2024","cd":"2024-10-07","lat":14.684876,"lon":121.03781,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2371},{"i":3158,"cid":"23OC0036","pid":"P00725533LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Sapang Buwaya Creek - Tributary Junction Creek Near Sanchez Avenue, District 1, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":82023005.37,"abc":82025000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-07-04","lat":14.471773,"lon":121.015903,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":0.75,"wp":[14.46769,121.01036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2372},{"i":3159,"cid":"24CD0035","pid":"P00838344LZ","t":"Construction of Flood Control Structure along Santa Maria River and Its Tributaries, Sta. 16+552-Sta. 16+852 (San Jose Patag - Pulong Buhangin Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499408.89,"abc":97999967.93,"fy":"2024","sd":"02/14/2024","cd":"2024-12-04","lat":14.879085,"lon":120.995471,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":6.02,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.61,"value":6.02,"text":"The title names Santa Maria, which OpenStreetMap maps through the stated municipality, but the pin is 6.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":246},{"i":3160,"cid":"22CD0002","pid":"P00620160LZ","t":"Construction of Flood Control Structure Pandayan - Saluysoy Creek, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":95512137.72,"abc":95534332.28,"fy":"2022","sd":"03/07/2022","cd":"2022-09-05","lat":14.74478,"lon":120.95756,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Saluysoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2373},{"i":3161,"cid":"24OD0055","pid":"P00839525LZ","t":"Rehabilitation of Drainage System, Barangay 158, Caloocan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":4875644.24,"abc":4949914.68,"fy":"2024","sd":"02/14/2024","cd":"2024-09-09","lat":14.673444,"lon":121.005065,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"158","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2374},{"i":3162,"cid":"23OE0047","pid":"P00740281LZ","t":"Construction of Retention Basin at Estero dela Reina, (Phase XIII), Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":96445697.36,"abc":96499854.46,"fy":"2023","sd":"03/28/2023","cd":"2024-11-15","lat":14.608809,"lon":120.97117,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60878,120.9712],"wst":"matched","br":null,"len":null,"ph":"Phase XIII","dup":[],"run":[3951,3928,3319],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0045 to 23OE0048) cover the same site, together worth PHP 350,867,677.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":275},{"i":3163,"cid":"22OI0112","pid":"P00637036LZ","t":"Rehabilitation of Drainage at Brgy. Pamplona 1, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"KPSL GENERAL CONTRACTOR INC.","c":14694920.46,"abc":14699920.46,"fy":"2022","sd":"05/27/2022","cd":"2022-11-22","lat":14.45811,"lon":120.971244,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pamplona 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2375},{"i":3164,"cid":"23BI0043","pid":"P00727118LZ","t":"Infrastructure/ Facilities - Construction of Barat Flood Control Structure along Sta. Cruz River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"E.T. LATAWAN CONSTRUCTION","c":48987038.54,"abc":49000000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-10-26","lat":16.362646,"lon":121.049861,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.16,"wp":[16.36177,121.05099],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2376},{"i":3165,"cid":"23OH0062","pid":"P00740511LZ","t":"Rehabilitation of Drainage within Zone 68-89, District 5, Manila","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48361055.97,"abc":48997520.46,"fy":"2023","sd":"05/17/2023","cd":"2024-06-30","lat":14.570896,"lon":120.995476,"sm":null,"fm":null,"tm":null,"am":892,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":41},{"i":3166,"cid":"23OE0191","pid":"P00726776LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase X, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96495792.9,"abc":96499593.63,"fy":"2023","sd":"03/10/2023","cd":"2023-06-23","lat":14.612135,"lon":120.971248,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61214,120.97126],"wst":"matched","br":null,"len":null,"ph":"Phase X","dup":[3175,3180],"run":[3977,3114,3128,3175,3180,3134,3143,3110],"cl":[],"L":"field","s":60,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 286,586,897.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":22},{"i":3167,"cid":"22OI0115","pid":"P00637754LZ","t":"Construction (Completion) of Flood Control Structure, Barangay Buli, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":49174889.46,"abc":49499224.52,"fy":"2022","sd":"05/27/2022","cd":"2022-11-22","lat":14.445863,"lon":121.049909,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buli","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2377},{"i":3168,"cid":"22OC0073","pid":"P00631028LZ","t":"Construction of Box Culvert at Filinvest, Brgy. San Isidro, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"M.P.Z. CARREON BUILDERS","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-10-25","lat":14.476442,"lon":121.005087,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[3748,3195],"cl":[3115,3195,3199,3460,3475,3631,3748,3825,3908,3914],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0072 to 22OC0074) cover the same site, together worth PHP 31,356,792.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":276},{"i":3169,"cid":"24OE0098","pid":"P00839528LZ","t":"Construction of Drainage System, Barangay 216, Zone 20, Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"S.R. LUMANTA CONSTRUCTION & SUPPLY","c":4898821.31,"abc":4899661.89,"fy":"2024","sd":"02/07/2024","cd":"2024-07-09","lat":14.624966,"lon":120.97776,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"216","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":42},{"i":3170,"cid":"23OG0038","pid":"P00726030LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase XV)","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"FRONT NINE KONSTRUCT (BUILDERS & REALTY DEVELOPMENT) CORPORATION","c":42208516.89,"abc":42531684.57,"fy":"2023","sd":"02/17/2023","cd":"2023-10-30","lat":14.619431,"lon":121.016014,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.61943,121.01624],"wst":"matched","br":null,"len":null,"ph":"Phase XV","dup":[],"run":[3629,3637],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OG0038 to 23OG0040) cover the same site, together worth PHP 125,205,799.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":584},{"i":3171,"cid":"22CD0020","pid":"P00620150LZ","t":"Construction of Flood Control Structure along Maasim River Diliman II Section, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":54875263.09,"abc":57899710.8,"fy":"2022","sd":"03/07/2022","cd":"2022-10-09","lat":15.033,"lon":120.95757,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":2.81,"wp":[15.03715,120.93179],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2378},{"i":3172,"cid":"21OC0041","pid":"P00525755LZ","t":"Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 2), Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":17626280.0,"abc":17626280.0,"fy":"2021","sd":"03/22/2022","cd":"2022-09-27","lat":14.470633,"lon":121.037852,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.87,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[3125,3152,3299,3393,3891,3934,3983],"L":"field","s":16,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1123},{"i":3173,"cid":"23BJ0051","pid":"P00742309LZ","t":"Construction of Flood Control Structures at Sitio Paitug Section, San Fabian, Kayapa, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"KAYAPA (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":98041656.51,"abc":98084800.0,"fy":"2023","sd":"03/23/2023","cd":"2023-11-24","lat":16.33472,"lon":120.97805,"sm":706,"fm":706,"tm":706,"am":706,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2379},{"i":3174,"cid":"24OH0042","pid":"P00820654LZ","t":"Construction of Drainage System (Box Culvert) Jesus St. Ext. (Sta. 0+000 to Sta. 0+255), Pandacan, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"N.M.E. CONSTRUCTION","c":29399712.44,"abc":29399758.52,"fy":"2024","sd":"02/21/2024","cd":"2024-12-10","lat":14.592154,"lon":121.005125,"sm":1079,"fm":null,"tm":1079,"am":1079,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":255.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2380},{"i":3175,"cid":"23OE0194","pid":"P00726779LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase XII, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JJPR CONSTRUCTION SERVICES","c":95763985.11,"abc":96499653.7,"fy":"2023","sd":"03/10/2023","cd":"2023-06-23","lat":14.612135,"lon":120.971248,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61214,120.97126],"wst":"matched","br":null,"len":null,"ph":"Phase XII","dup":[3166,3180],"run":[3977,3166,3114,3128,3180,3134,3143,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 286,586,897.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":35},{"i":3176,"cid":"22DQ0024","pid":"P00632880LZ","t":"Construction of Drainage (Lotehan), Barangay Mabuhay, Carmona, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":9899912.64,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.30987,"lon":121.05001,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2381},{"i":3177,"cid":"23OE0136","pid":"P00726000LZ","t":"Rehabilitation of Estero de Sampaloc, Manila","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":7837953.97,"abc":7839917.67,"fy":"2023","sd":"02/17/2023","cd":"2023-06-16","lat":14.6094,"lon":120.99556,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc","wn":"Estero de Sampaloc","wd":0.02,"wp":[14.60928,120.99542],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":43},{"i":3178,"cid":"22OI0037","pid":"P00620907LZ","t":"Construction of Flood Control Structure, Daclangan Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":48993812.8,"abc":48999302.16,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.434694,"lon":121.016271,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Daclangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2382},{"i":3179,"cid":"23OF0086","pid":"P00736170LZ","t":"Rehabilitation of Flood Control Structure (Phase 2), Barangay Pasong Putik, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":48993565.33,"abc":48999920.0,"fy":"2023","sd":"03/21/2023","cd":"2023-12-18","lat":14.7257,"lon":121.050161,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasong Putik","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2383},{"i":3180,"cid":"23OE0195","pid":"P00726780LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase XI, Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":94327118.63,"abc":96499482.7,"fy":"2023","sd":"03/10/2023","cd":"2023-07-25","lat":14.612135,"lon":120.971248,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61214,120.97126],"wst":"matched","br":null,"len":null,"ph":"Phase XI","dup":[3166,3175],"run":[3977,3166,3114,3128,3175,3134,3143,3110],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 286,586,897.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":36},{"i":3181,"cid":"24OF0156","pid":"P00824625LZ","t":"Construction of Drainage Systems at Brgy. Balonbato, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"ROSAND BUILDERS CORPORATION (FORMERLY: ROSAND BUILDERS)","c":19395974.55,"abc":19599812.6,"fy":"2024","sd":"04/29/2024","cd":"2024-11-18","lat":14.66377,"lon":121.00526,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balonbato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2384},{"i":3182,"cid":"22DQ0012","pid":"P00620879LZ","t":"Construction of Revetment along Imus River, at Brgy. Sabutan, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":82906844.73,"abc":82922448.2,"fy":"2022","sd":"03/27/2022","cd":"2023-01-15","lat":14.23292,"lon":120.97819,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.23293,120.97816],"wst":"matched","br":"Sabutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2385},{"i":3183,"cid":"22DQ0020","pid":"P00620581LZ","t":"Construction of Flood Mitigation Structure (Revetment) along Carmona River, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION / OMNICON BUILDERS","c":48999129.12,"abc":48999988.19,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.29202,"lon":121.038,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.11,"wp":[14.28807,121.04744],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2386},{"i":3184,"cid":"22CD0012","pid":"P00620522LZ","t":"Construction of additional Pumping Station at Barangay Saluysoy, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":19599471.16,"abc":19607596.69,"fy":"2022","sd":"02/28/2022","cd":"2022-08-01","lat":14.73733,"lon":120.95769,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Saluysoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2387},{"i":3185,"cid":"24OE0032","pid":"P00823236LZ","t":"Construction of Retarding Basin and Installation of Booster Pump Accessories along Estero dela Reina, Tondo, Manila City","w":"Construction of Retarding Basin","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96498773.68,"abc":96499413.2,"fy":"2024","sd":"02/07/2024","cd":"2025-01-24","lat":14.61079,"lon":120.97137,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.6108,120.97145],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":44},{"i":3186,"cid":"23OH0042","pid":"P00726036LZ","t":"Rehabilitation of Maricaban Retarding Pond, Pasay City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":24070866.51,"abc":24499688.96,"fy":"2023","sd":"02/23/2023","cd":"2023-06-06","lat":14.532832,"lon":121.005261,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2388},{"i":3187,"cid":"22OI0075","pid":"P00640483LZ","t":"Construction (Completion) of Flood Mitigation Structure, Bayanan River, Barangay Putatan, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"AARCON BUILDERS","c":48994199.14,"abc":48999356.64,"fy":"2022","sd":"04/07/2022","cd":"2023-01-01","lat":14.400693,"lon":121.038037,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Bayanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Putatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2389},{"i":3188,"cid":"23OE0090","pid":"P00726798LZ","t":"Construction of Box Culvert along C. Aguila St., San Miguel, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":74700405.94,"abc":77199513.96,"fy":"2023","sd":"03/09/2023","cd":"2024-03-31","lat":14.59896,"lon":120.99578,"sm":1336,"fm":null,"tm":1336,"am":1336,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2390},{"i":3189,"cid":"23CD0017","pid":"P00726519LZ","t":"Construction of Flood Control Structure along Angat River, Calumpang Section, Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":57899987.23,"abc":57899387.58,"fy":"2023","sd":"02/22/2023","cd":"2023-10-12","lat":14.908375,"lon":121.050322,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90838,121.0507],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3885,3747],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0016 to 23CD0018) cover the same site, together worth PHP 138,114,039.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":428},{"i":3190,"cid":"24OA0051","pid":"P00839517LZ","t":"Construction of Babanse 1 Pumping Station (Phase 2), Barangay North Bay Boulevard South - Kaunlaran, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":9899803.02,"abc":9843801.48,"fy":"2024","sd":"02/21/2024","cd":"2024-10-08","lat":14.64594,"lon":120.9578,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"North Bay Boulevard South","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00569,"text":"Contract cost is 0.57% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":993},{"i":3191,"cid":"22OE0032","pid":"P00620115LZ","t":"Rehabilitation of Blumentritt Interceptor, Manila City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"V.R. GUEVARRA CONSTRUCTION AND TRADING / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":50683750.77,"abc":53074424.77,"fy":"2022","sd":"04/01/2022","cd":"2022-10-19","lat":14.634147,"lon":120.978425,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":45},{"i":3192,"cid":"18EB0117","pid":"P00223373LZ","t":"Construction of Anahawin River Flood Control Structures, Phase 1, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Calintaan","deo":"Mindoro Occidental District Engineering Office","co":"FFJJ CONSTRUCTION","c":47088811.23,"abc":49000000.0,"fy":"2018","sd":"04/20/2018","cd":"2022-11-27","lat":12.632189,"lon":121.01635,"sm":307,"fm":null,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Anahawin","wn":"Anahawin River","wd":0.03,"wp":[12.63197,121.01643],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2391},{"i":3193,"cid":"24OE0071","pid":"P00820022LZ","t":"Construction of Flood Control Structure along Estero de Maypajo, Package I, Manila","w":"Construction of Revetment","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DMLC BUILDERS","c":113128305.9,"abc":115799352.5,"fy":"2024","sd":"02/14/2024","cd":"2024-08-13","lat":14.634218,"lon":120.978545,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":1.08,"wp":[14.63683,120.96891],"wst":"matched","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":46},{"i":3194,"cid":"23OE0003","pid":"P00726801LZ","t":"Installation of Booster Pump at Estero de Binondo Phase I, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":71910972.99,"abc":72374153.2,"fy":"2023","sd":"03/10/2023","cd":"2023-07-22","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo Phase I","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[3198,3212,3292,3297,3302,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":176},{"i":3195,"cid":"22OC0074","pid":"P00631029LZ","t":"Construction of Box Culvert at P Filinvest, Brgy. San Isidro, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":14696791.82,"abc":14700000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-01-17","lat":14.476321,"lon":121.005271,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[3748,3168],"cl":[3115,3168,3199,3460,3475,3631,3748,3825,3908,3914],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0072 to 22OC0074) cover the same site, together worth PHP 31,356,792.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":208},{"i":3196,"cid":"21OD0175","pid":"P00525792LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 173, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":47802379.15,"abc":48977866.71,"fy":"2021","sd":"03/24/2022","cd":"2022-12-05","lat":14.75585,"lon":121.03814,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"173","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2392},{"i":3197,"cid":"24CF0083","pid":"P00839584LZ","t":"Construction of Drainage Structure, Barangay Magsaysay Norte, Cabanatuan City, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":9792146.27,"abc":9899964.0,"fy":"2024","sd":"05/14/2024","cd":"2024-11-14","lat":15.485556,"lon":120.978611,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magsaysay Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2393},{"i":3198,"cid":"23OE0027","pid":"P00740286LZ","t":"Installation of Booster Pump at Estero de Binondo Phase IV, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":70385575.94,"abc":72374299.68,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo Phase IV","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[3194,3212,3292,3297,3302,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":177},{"i":3199,"cid":"23OC0041","pid":"P00737395LZ","t":"Construction of Drainage System along Lirio and Sampaguita Street, Matatdo, Barangay San Isidro, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":5047645.32,"abc":5049000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-05-09","lat":14.476067,"lon":121.016491,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3460,3475,3631,3748,3825,3908,3914],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1100},{"i":3200,"cid":"23OF0032","pid":"P00736174LZ","t":"Rehabilitation of Flood Control Structure of Barangay San Bartolome (Phase 2), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"MSV CONSTRUCTION AND SUPPLIES","c":48990596.0,"abc":48999900.0,"fy":"2023","sd":"02/14/2023","cd":"2023-08-11","lat":14.702761,"lon":121.038219,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Bartolome","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2394},{"i":3201,"cid":"22OE0033","pid":"P00620112LZ","t":"Rehabilitation of Doroteo Jose St. including Drainage System, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"LE BRON CONSTRUCTION","c":55672291.67,"abc":55680494.59,"fy":"2022","sd":"02/18/2022","cd":"2023-03-06","lat":14.60562,"lon":120.97865,"sm":null,"fm":null,"tm":null,"am":1378,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":47},{"i":3202,"cid":"22OD0130","pid":"P00621407LZ","t":"Construction of Flood Control Wall with Roads and Drainage along Benito Hao Creek, Brgy. Mapulang Lupa, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":19025387.56,"abc":19593693.52,"fy":"2022","sd":"03/24/2022","cd":"2022-11-17","lat":14.708497,"lon":121.005354,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Benito Hao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mapulang Lupa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2395},{"i":3203,"cid":"22CD0053","pid":"P00620186LZ","t":"Construction of Slope Protection, Sapang Palay Proper, City of San Jose Del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":92676125.88,"abc":94086938.04,"fy":"2022","sd":"03/07/2022","cd":"2022-12-12","lat":14.83393,"lon":121.03829,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2396},{"i":3204,"cid":"22PI0023","pid":"P00621008LZ","t":"Construction of Chico-Karayan-Tikitik Flood Control Structure, Sta. 29+000 - Sta. 29+760 (LS) along Chico River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"JBA CONSTRUCTION AND BUILDERS","c":29400000.0,"abc":29399999.7,"fy":"2022","sd":"02/17/2022","cd":"2022-08-12","lat":17.08631,"lon":120.9787,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.08626,120.97901],"wst":"matched","br":null,"len":760.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2397},{"i":3205,"cid":"24OE0074","pid":"P00823252LZ","t":"Construction of Flood Mitigation Structure along Estero de San Lazaro, Manila City","w":"Construction of Revetment","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"AL-AMEN BUILDERS","c":67549086.8,"abc":67549454.35,"fy":"2024","sd":"02/13/2024","cd":"2024-06-20","lat":14.619932,"lon":120.978803,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de San Lazaro","wn":"Estero de San Lazaro","wd":0.01,"wp":[14.61991,120.9789],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":48},{"i":3206,"cid":"23DQ0085","pid":"P00742172LZ","t":"Construction of Slope Protection Structure along San Isidro River, West Side, Barangay Iba Silang, Cavite (Phase II)","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"MOTIONTRADE DEVELOPMENT CORPORATION / OMNICON BUILDERS","c":98998997.47,"abc":98999944.23,"fy":"2023","sd":"05/22/2023","cd":"2023-12-02","lat":14.21346,"lon":120.97893,"sm":1455,"fm":1455,"tm":360,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":28.89,"wp":[14.47354,121.00247],"wst":"matched","br":"Iba Silang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":28.46,"text":"The record contradicts itself: the municipality field and the pin point to Silang, Cavite, but the title names Cavite City, Cavite, 28 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":431},{"i":3207,"cid":"23CD0089","pid":"P00726505LZ","t":"Construction of flood control Structure at the Langka-Libtong tributaries of Meycauayan River (Left and Right)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":67549932.15,"abc":67549567.63,"fy":"2023","sd":"02/27/2023","cd":"2023-09-17","lat":14.740671,"lon":120.978938,"sm":406,"fm":406,"tm":null,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.01,"wp":[14.74055,120.97897],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2398},{"i":3208,"cid":"23CD0049","pid":"P00726502LZ","t":"Construction of Flood Control Structure Meycauayan Tributaries (Left Side), NLEX-Langka-Libtong Section, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"N.M.E. CONSTRUCTION","c":39564412.44,"abc":40179117.11,"fy":"2023","sd":"02/27/2023","cd":"2023-08-08","lat":14.740664,"lon":120.978964,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2399},{"i":3209,"cid":"21D00079","pid":"P00525632LZ","t":"Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"Bacoor City","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":244114309.5,"abc":244145000.0,"fy":"2021","sd":"12/03/2021","cd":"2022-09-28","lat":14.393,"lon":120.979,"sm":98,"fm":null,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Molino VI","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2400},{"i":3210,"cid":"22CD0042","pid":"P00620188LZ","t":"Constructions of Flood Control Structure Meycauayan River and its Tributaries along Ciudad Grande, Lawa, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":95510324.84,"abc":95530236.72,"fy":"2022","sd":"03/07/2022","cd":"2022-09-30","lat":14.72465,"lon":120.97907,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":1.41,"wp":[14.73404,120.97016],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2401},{"i":3211,"cid":"21OC0155","pid":"P00525757LZ","t":"Rehabilitation of Slope Protection, Moonwalk Creek Tributary, Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":19599792.93,"abc":19600000.0,"fy":"2021","sd":"03/22/2022","cd":"2022-09-26","lat":14.493222,"lon":121.016497,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Moonwalk","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2402},{"i":3212,"cid":"23OE0028","pid":"P00726802LZ","t":"Installation of Booster Pump at Estero de Binondo Phase II, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":72325692.28,"abc":72374153.2,"fy":"2023","sd":"03/10/2023","cd":"2023-07-22","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo Phase II","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[3194,3198,3292,3297,3302,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":178},{"i":3213,"cid":"22DQ0097","pid":"P00639376LZ","t":"Construction of Slope Protection (River Drive), Molino 3 to San Nicolas 1 (Section) Phase 1, Bacoor City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":96427547.43,"abc":96499992.5,"fy":"2022","sd":"04/06/2022","cd":"2023-02-17","lat":14.42168,"lon":120.97913,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2403},{"i":3214,"cid":"23D00164","pid":"P00742177LZ","t":"Construction of Flood Control Structures, Road and Other Improvements, Molino River, Brgy Molino 3, Bacoor, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":71248261.56,"abc":71280000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-04-11","lat":14.39275,"lon":120.97918,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Molino","wn":"Molino River","wd":0.02,"wp":[14.39274,120.97937],"wst":"matched","br":"Molino 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2404},{"i":3215,"cid":"23DQ0084","pid":"P00742171LZ","t":"Construction of Slope Protection Structure along San Isidro River, West Side, Barangay Iba Silang, Cavite (Phase I)","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":98999358.76,"abc":98999942.71,"fy":"2023","sd":"05/18/2023","cd":"2024-04-11","lat":14.21623,"lon":120.97926,"sm":1455,"fm":1455,"tm":360,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":28.58,"wp":[14.47354,121.00247],"wst":"matched","br":"Iba Silang","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":28.19,"text":"The record contradicts itself: the municipality field and the pin point to Silang, Cavite, but the title names Cavite City, Cavite, 28 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":432},{"i":3216,"cid":"23PI0080","pid":"P00726414LZ","t":"Construction of Caluttit-Pakkil Flood Control, Sta. 28 + 242 - Sta. 28 + 440 (LS) along Chico River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"A.I.P. CONSTRUCTION / LEWIN VANNE GENERAL ENGINEERING AND CONSTRUCTION","c":77200000.0,"abc":77199999.3,"fy":"2023","sd":"07/19/2023","cd":"2024-02-27","lat":17.08912,"lon":120.9793,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.08904,120.97961],"wst":"matched","br":null,"len":198.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2405},{"i":3217,"cid":"25OE0081","pid":"P00922881LZ","t":"Installation of Booster Pump (Accessories) along Estero dela Reina, Manila City (Phase II)","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"A.M. SALONG CONSTRUCTION","c":37962740.47,"abc":38599649.79,"fy":"2025","sd":"03/12/2025","cd":"2025-04-20","lat":14.599387,"lon":120.979339,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.59939,120.97934],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":49},{"i":3218,"cid":"23EB0029","pid":"P00727378LZ","t":"Construction of Busuanga Flood Control Structure (San Agustin Section), Sta. 0 + 000 - Sta. 0 + 330, San Jose, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SAN JOSE (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES / R.M.A.J. CONSTRUCTION","c":45077987.54,"abc":45080000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-09-20","lat":12.4344,"lon":120.97935,"sm":1305,"fm":1305,"tm":1305,"am":1305,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":330.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2406},{"i":3219,"cid":"24OD0265","pid":"P00838472LZ","t":"Construction of Drainage System along Barangay 61, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DMLC BUILDERS","c":23958667.09,"abc":24497835.23,"fy":"2024","sd":"05/06/2024","cd":"2025-03-31","lat":14.648936,"lon":120.979359,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"61","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2407},{"i":3220,"cid":"21DQ0061","pid":"P00525635LZ","t":"Construction of Revetment and Other Related Improvements, Zapote River, Barangay Molino VI, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"Bacoor City","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":48227677.8,"abc":48249995.3,"fy":"2021","sd":"10/11/2021","cd":"2022-09-11","lat":14.4215,"lon":120.97936,"sm":98,"fm":null,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.82,"wp":[14.42274,120.98683],"wst":"matched","br":"Molino VI","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2408},{"i":3221,"cid":"24CE0120","pid":"P00823469LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Caputican, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"RPP 928 CONSTRUCTION CORPORATION","c":28660843.38,"abc":28950000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-08-27","lat":15.663803,"lon":120.979615,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.07,"wp":[15.66429,120.97927],"wst":"matched","br":"Caputican","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2409},{"i":3222,"cid":"24CE0192","pid":"P00848620LZ","t":"Construction of River Channel Improvement along Talavera River (Brgy. Caputican), Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":73507517.6,"abc":74250000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-09-03","lat":15.663863,"lon":120.979615,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.06,"wp":[15.6643,120.97928],"wst":"matched","br":"Caputican","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2410},{"i":3223,"cid":"24OE0007","pid":"P00820089LZ","t":"Installation of Booster Pump at Estero dela Reina (Escolta Bridge), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":138756597.0,"abc":140157466.9,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.599064,"lon":120.979673,"sm":null,"fm":null,"tm":null,"am":1378,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.59906,120.97967],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":50},{"i":3224,"cid":"23DE0067","pid":"P00740398LZ","t":"Construction of Calumpang East Line Canal, San Luis, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN LUIS (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"SUPPLICON BUILDERS","c":3860000.0,"abc":3920000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-06-25","lat":13.845,"lon":120.9797,"sm":1321,"fm":1321,"tm":1321,"am":1321,"md":0.0,"ls":"inside","ww":"Calumpang East Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2411},{"i":3225,"cid":"23CD0085","pid":"P00742331LZ","t":"Construction of Slope Protection Wall in Brgy. San Jose Patag, Sta. Maria, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"PLL BUILDERS INC.","c":4945644.73,"abc":4945114.06,"fy":"2023","sd":"03/30/2023","cd":"2023-08-09","lat":14.8235,"lon":120.9798,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose Patag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2412},{"i":3226,"cid":"22OE0012","pid":"P00620433LZ","t":"Construction of Retarding Basin at Estero dela Reina, (Phase IV), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":48999081.39,"abc":48999912.96,"fy":"2022","sd":"02/17/2022","cd":"2022-10-05","lat":14.59866,"lon":120.97991,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.59868,120.97994],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[3010,3980],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OE0011 to 22OE0013) cover the same site, together worth PHP 146,190,709.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":521},{"i":3227,"cid":"24OE0178","pid":"P00823275LZ","t":"Rehabilitation of Escolta Pumping Station, Manila","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JMRP CONSTRUCTION SERVICES","c":144457367.3,"abc":144749606.5,"fy":"2024","sd":"02/20/2024","cd":"2024-07-16","lat":14.597828,"lon":120.979982,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":51},{"i":3228,"cid":"22DQ0063","pid":"P00637081LZ","t":"Construction of Slope Protection from Baluctot River to Gov's Drive, Sampaloc III, Paliparan I, Dasmariñas, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"KLDS TRADING & CONSTRUCTION","c":29398431.92,"abc":29399994.73,"fy":"2022","sd":"04/06/2022","cd":"2023-01-15","lat":14.29059,"lon":120.98039,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Baluctot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2413},{"i":3229,"cid":"22OE0091","pid":"P00620423LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de San Miguel, Barangay 389 Phase I, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":46917446.49,"abc":48999944.13,"fy":"2022","sd":"02/18/2022","cd":"2022-10-06","lat":14.597681,"lon":120.980663,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de San Miguel","wn":"Estero de San Miguel","wd":0.4,"wp":[14.59472,120.98277],"wst":"matched","br":"389 Phase I","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":52},{"i":3230,"cid":"23OE0064","pid":"P00725503LZ","t":"Installation of Booster Pump including Retarding Basin at Estero de Maypajo (near Rizal avenue St.), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":86849835.87,"abc":86849891.04,"fy":"2023","sd":"02/17/2023","cd":"2023-09-14","lat":14.63349,"lon":120.980903,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":1.34,"wp":[14.63675,120.96888],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[315,316,317],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0061 to 23OE0064) cover the same site, together worth PHP 368,630,125.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":329},{"i":3231,"cid":"23DQ0046","pid":"P00725765LZ","t":"Construction of Flood Prevention Structure along San Isidro River Phase 3, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96492780.49,"abc":96499961.13,"fy":"2023","sd":"04/24/2023","cd":"2024-05-17","lat":14.21964,"lon":120.98094,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":28.19,"wp":[14.47354,121.00247],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[3236,3251],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DQ0044 to 23DQ0047) cover the same site, together worth PHP 289,481,923.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":277},{"i":3232,"cid":"23OH0056","pid":"P00727041LZ","t":"Improvement of Pumping Station along Lagusnilad, Manila City (Phase I)","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":24412468.58,"abc":24499419.95,"fy":"2023","sd":"04/24/2023","cd":"2023-12-22","lat":14.588542,"lon":120.981021,"sm":null,"fm":null,"tm":null,"am":550,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":53},{"i":3233,"cid":"24CD0080","pid":"P00820213LZ","t":"Construction of Flood Control Structure along Sta. Maria River and Its Tributaries, Sta. 14+152 - Sta. 14+452 (San Jose Patag - Pulong Buhangin Section), Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":85943604.24,"abc":85950582.75,"fy":"2024","sd":"02/26/2024","cd":"2024-10-21","lat":14.86196,"lon":120.981414,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":4.33,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.33,"text":"The title names Sta. Maria, which OpenStreetMap maps through the stated municipality, but the pin is 4.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":311},{"i":3234,"cid":"23D00165","pid":"P00742179LZ","t":"Construction of Flood Control Structures along Zapote River, Brgy San Nicolas 3, Bacoor, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":56428250.88,"abc":56430000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-04-05","lat":14.38336,"lon":120.98158,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":2.5,"wp":[14.39381,121.00209],"wst":"matched","br":"San Nicolas 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2414},{"i":3235,"cid":"22OI0080","pid":"P00637035LZ","t":"Rehabilitation of Drainage at Brgy. Daniel Fajardo, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":9797660.46,"abc":9799996.7,"fy":"2022","sd":"04/07/2022","cd":"2022-10-03","lat":14.480635,"lon":120.981833,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daniel Fajardo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2415},{"i":3236,"cid":"23DQ0044","pid":"P00725764LZ","t":"Construction of Flood Prevention Structure along San Isidro River Phase 2, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96493672.63,"abc":96499947.07,"fy":"2023","sd":"04/24/2023","cd":"2024-04-07","lat":14.22173,"lon":120.98217,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":27.95,"wp":[14.47354,121.00247],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[3231,3251],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DQ0044 to 23DQ0047) cover the same site, together worth PHP 289,481,923.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":278},{"i":3237,"cid":"24CF0023","pid":"P00823443LZ","t":"Construction of Peñaranda River Flood Control Structure, Barangay Santo Tomas, Peñaranda, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PEÑARANDA (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":141840512.3,"abc":141840507.3,"fy":"2024","sd":"02/12/2024","cd":"2024-05-28","lat":15.364665,"lon":120.982454,"sm":1119,"fm":1119,"tm":1119,"am":1119,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.09,"wp":[15.36545,120.98214],"wst":"matched","br":"Santo Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2416},{"i":3238,"cid":"20EB0054","pid":"P00421959LZ","t":"Construction of Flood Control Structures Lumintao River Magsikap Section, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Rizal","deo":"Mindoro Occidental District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":34690916.94,"abc":34692000.0,"fy":"2020","sd":"02/24/2020","cd":"2023-01-02","lat":12.52112,"lon":120.98247,"sm":1210,"fm":null,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.63,"wp":[12.5262,120.98501],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2417},{"i":3239,"cid":"22CD0154","pid":"P00621276LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 11+400 - Sta. 12+700, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":48248408.12,"abc":48999450.0,"fy":"2022","sd":"03/30/2022","cd":"2023-02-28","lat":15.21633,"lon":120.98255,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.02,"wp":[15.21647,120.98262],"wst":"matched","br":null,"len":1300.0,"ph":null,"dup":[],"run":[3567,3738,2264,3047,2323,3520,3061,3096,3476],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":549},{"i":3240,"cid":"23C00190","pid":"P00735975LZ","t":"Construction of Flood Control Structure along San Miguel River, Sta. 12+430 - Sta. 12+630, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"SELPHAR CONSTRUCTION / N.B. AVILA CONSTRUCTION","c":82024947.3,"abc":82024986.86,"fy":"2023","sd":"06/05/2023","cd":"2024-02-26","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[3241,3242,3243,3244,3245],"run":[],"cl":[],"L":"field","s":43,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":164},{"i":3241,"cid":"23C00227","pid":"P00727393LZ","t":"Construction of Flood Control Structures Along San Miguel River, Sta. 10 + 910 to Sta. 11 + 210, San Miguel Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":96499303.4,"abc":96499940.3,"fy":"2023","sd":"07/10/2023","cd":"2024-04-04","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":null,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[3240,3242,3243,3244,3245],"run":[],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":126},{"i":3242,"cid":"23C00228","pid":"P00727384LZ","t":"Construction of Flood Control Structures along San Miguel River, Sta. 11 + 210 to Sta. 11 + 510, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96496468.6,"abc":96499920.74,"fy":"2023","sd":"07/10/2023","cd":"2024-04-04","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[3240,3241,3243,3244,3245],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":138},{"i":3243,"cid":"23C00229","pid":"P00727385LZ","t":"Construction of Flood Control Structures along San Miguel River, Sta. 11 + 510 to Sta. 11 + 810, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"GLOBALCRETE BUILDERS INC.","c":96499361.4,"abc":96499938.34,"fy":"2023","sd":"07/10/2023","cd":"2024-04-04","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[3240,3241,3242,3244,3245],"run":[],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":127},{"i":3244,"cid":"23C00247","pid":"P00727397LZ","t":"Construction of Flood Control Structures along San Miguel River, Sta. 00+210-Sta. 00+550 (Upstream), Brgy. Batasan Bata, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"LE BRON CONSTRUCTION / OLYMPUS MINING AND BUILDERS GROUP PHILS. CORP. (FORMERLY: OLYMPUS BUILDERS AND MINING CORP.)","c":86848708.72,"abc":86849952.5,"fy":"2023","sd":"08/28/2023","cd":"2024-05-23","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":"Batasan Bata","len":340.0,"ph":null,"dup":[3240,3241,3242,3243,3245],"run":[],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":149},{"i":3245,"cid":"23C00248","pid":"P00727396LZ","t":"Construction of Flood Control Structures along San Miguel River, Sta. 00+550-Sta. 00+912 (Downstream), Brgy. Batasan Bata, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"LE BRON CONSTRUCTION / OLYMPUS MINING AND BUILDERS GROUP PHILS. CORP. (FORMERLY: OLYMPUS BUILDERS AND MINING CORP.)","c":91674157.28,"abc":91674940.51,"fy":"2023","sd":"08/28/2023","cd":"2024-05-23","lat":15.146316,"lon":120.982593,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"San Miguel","wn":"San Miguel River","wd":0.01,"wp":[15.14635,120.98249],"wst":"matched","br":"Batasan Bata","len":362.0,"ph":null,"dup":[3240,3241,3242,3243,3244],"run":[],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 550,042,947.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":150},{"i":3246,"cid":"24OE0106","pid":"P00824612LZ","t":"Rehabilitation of Drainage System along Oroquieta St. (Phase II), Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G2XD CONSTRUCTION SERVICES","c":26216676.55,"abc":26459782.87,"fy":"2024","sd":"02/12/2024","cd":"2024-11-21","lat":14.605139,"lon":120.982824,"sm":null,"fm":null,"tm":null,"am":1378,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":54},{"i":3247,"cid":"24CD0008","pid":"P00820176LZ","t":"Bank Improvement along Sta. Maria River and Its Tributaries, Sta.13+748-Sta.14+152 (San Jose Patag- Pulong Buhangin Section), Sta Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":88355138.92,"abc":88362767.24,"fy":"2024","sd":"02/14/2024","cd":"2024-11-24","lat":14.859167,"lon":120.983022,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":3.99,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":404.0,"ph":null,"dup":[],"run":[3254,3249],"cl":[],"L":"records","s":61,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":3.99,"text":"The title names Sta. Maria, which OpenStreetMap maps through the stated municipality, but the pin is 4.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0006 to 24CD0008) cover the same site, together worth PHP 265,064,108.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":90},{"i":3248,"cid":"23C00233","pid":"P00727400LZ","t":"Construction of Flood Control Structure along Maasim River, Sta. 8+400 - Sta. 8+705, Brgy. Upig, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96499188.38,"abc":96499982.63,"fy":"2023","sd":"07/10/2023","cd":"2024-04-04","lat":15.026971,"lon":120.983109,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":5.63,"wp":[15.03715,120.93179],"wst":"matched","br":"Upig","len":305.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.63,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 5.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":256},{"i":3249,"cid":"24CD0007","pid":"P00820175LZ","t":"Bank Improvement along Sta. Maria River and Its Tributaries, Sta.13+344- Sta.13+748 (San Jose Patag-Pulong Buhangin Section), Sta Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"DJB CONSTRUCTION SERVICES","c":88353631.42,"abc":88363033.02,"fy":"2024","sd":"02/14/2024","cd":"2024-11-24","lat":14.857261,"lon":120.983324,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":3.78,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":404.0,"ph":null,"dup":[],"run":[3254,3247],"cl":[],"L":"records","s":61,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.78,"text":"The title names Sta. Maria, which OpenStreetMap maps through the stated municipality, but the pin is 3.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0006 to 24CD0008) cover the same site, together worth PHP 265,064,108.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":91},{"i":3250,"cid":"23E00015","pid":"P00725865LZ","t":"Construction of Bank Protection Structure with Road Dike along Lumintao River, Magsikap Section, Rizal, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96496890.26,"abc":96499999.21,"fy":"2023","sd":"02/11/2023","cd":"2023-11-10","lat":12.5219,"lon":120.9834,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.5,"wp":[12.52599,120.98545],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2418},{"i":3251,"cid":"23DQ0047","pid":"P00725763LZ","t":"Construction of Flood Prevention Structure along San Isidro River Phase 1, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96495469.47,"abc":96499965.62,"fy":"2023","sd":"04/24/2023","cd":"2024-04-07","lat":14.2237,"lon":120.9835,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":27.72,"wp":[14.47354,121.00247],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[3236,3231],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DQ0044 to 23DQ0047) cover the same site, together worth PHP 289,481,923.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":279},{"i":3252,"cid":"23CD0050","pid":"P00726503LZ","t":"Construction of Flood Control Structure Meycauayan Tributaries (Right Side), NLEX-Langka-Libtong Section, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":39564000.0,"abc":40179117.11,"fy":"2023","sd":"03/13/2023","cd":"2023-08-22","lat":14.744584,"lon":120.983518,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2419},{"i":3253,"cid":"23OD0184","pid":"P00737398LZ","t":"Construction of Drainage System along Barangay 61, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MIGHTY CONSTRUCTION & DEVELOPMENT INC.","c":24190409.16,"abc":24742846.22,"fy":"2023","sd":"05/19/2023","cd":"2023-12-27","lat":14.648762,"lon":120.983626,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"61","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2420},{"i":3254,"cid":"24CD0006","pid":"P00820174LZ","t":"Bank Improvement along Sta. Maria River and Its Tributaries, Sta.12+940- Sta.13+344 (San Jose Patag-Pulong Buhangin Section), Sta Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":88355337.98,"abc":88362901.29,"fy":"2024","sd":"02/14/2024","cd":"2025-02-22","lat":14.853822,"lon":120.983649,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":3.4,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":404.0,"ph":null,"dup":[],"run":[3249,3247],"cl":[],"L":"records","s":61,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.4,"text":"The title names Sta. Maria, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24CD0006 to 24CD0008) cover the same site, together worth PHP 265,064,108.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":92},{"i":3255,"cid":"24CD0110","pid":"P00823478LZ","t":"Construction of Flood Control Structure along Sta. Maria River and Its Tributaries, Sta. 14+452 - Sta. 14+667 (San Jose Patag - Pulong Buhangin Section), Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":61825399.21,"abc":61825265.39,"fy":"2024","sd":"03/18/2024","cd":"2024-12-18","lat":14.864158,"lon":120.983977,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":4.49,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":215.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.49,"text":"The title names Sta. Maria, which OpenStreetMap maps through the stated municipality, but the pin is 4.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":322},{"i":3256,"cid":"22OD0010","pid":"P00620394LZ","t":"Construction of Flood Control Wall along Maysan-Parada Creek, Brgy. Maysan, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":14239655.66,"abc":14695219.81,"fy":"2022","sd":"02/08/2022","cd":"2022-08-30","lat":14.69916,"lon":120.98405,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Maysan-Parada","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2421},{"i":3257,"cid":"22OD0132","pid":"P00621409LZ","t":"Construction of Flood Control Wall along Malabo Creek, Brgy. Maysan, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":19028179.35,"abc":19596502.37,"fy":"2022","sd":"03/24/2022","cd":"2022-11-17","lat":14.670416,"lon":120.984284,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Malabo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maysan","len":null,"ph":null,"dup":[3258],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 63,668,513.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1022},{"i":3258,"cid":"22OD0180","pid":"P00621408LZ","t":"Rehabilitation of Flood Control Wall along Tullahan River, Brgy. Marulas, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":44640333.82,"abc":46038732.02,"fy":"2022","sd":"03/24/2022","cd":"2023-05-29","lat":14.670416,"lon":120.984284,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":0.01,"wp":[14.67033,120.9842],"wst":"matched","br":"Marulas","len":null,"ph":null,"dup":[3257],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 63,668,513.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":964},{"i":3259,"cid":"22DQ0077","pid":"P00639491LZ","t":"Construction of Drainage, Barangay Iba, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TCSC CORP.","c":4899921.0,"abc":19599797.32,"fy":"2022","sd":"04/11/2022","cd":"2022-10-17","lat":14.21803,"lon":120.98452,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2422},{"i":3260,"cid":"23OA0057","pid":"P00742218LZ","t":"Rehabilitation of Floodwall along Malabon-Tullahan River, Brgy. Potrero, Malabon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":7916292.51,"abc":7916735.0,"fy":"2023","sd":"03/27/2023","cd":"2023-07-24","lat":14.669715,"lon":120.984597,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Potrero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2423},{"i":3261,"cid":"22OI0107","pid":"P00637034LZ","t":"Rehabilitation of Drainage System at Brgy. Manuyo 1, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"OMNICON BUILDERS","c":29398998.82,"abc":29399999.71,"fy":"2022","sd":"05/27/2022","cd":"2023-06-10","lat":14.484559,"lon":120.984638,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manuyo 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2424},{"i":3262,"cid":"23CF0028","pid":"P00737469LZ","t":"Construction of Drainage Canal, Barangay Valle Cruz, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":5791378.53,"abc":5939960.93,"fy":"2023","sd":"02/10/2023","cd":"2023-06-02","lat":15.4736,"lon":120.985,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Valle Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2425},{"i":3263,"cid":"25OE0041","pid":"P00920054LZ","t":"Upgrading of Recto Pumping Station, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":47322508.07,"abc":48249769.2,"fy":"2025","sd":"02/12/2025","cd":"2025-04-02","lat":14.603366,"lon":120.985038,"sm":null,"fm":null,"tm":null,"am":1378,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":55},{"i":3264,"cid":"21PI0033","pid":"P00526382LZ","t":"Construction of Agkuyu-Chico River Flood Control; Sta. 30 + 720 - Sta. 31 + 260 (L.S.), Sta. 30+710 - Sta. 30+770 (R.S.), Barangay Samoki, Bontoc, Mountain Provincee","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Bontoc","deo":"Mountain Province 1st District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / KOMICHOV GENERAL CONSTRUCTION","c":49000000.0,"abc":48999999.7,"fy":"2021","sd":"04/11/2022","cd":"2022-12-15","lat":17.074577,"lon":120.985047,"sm":227,"fm":null,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Agkuyu-Chico","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Samoki","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2426},{"i":3265,"cid":"24OD0070","pid":"P00820615LZ","t":"Construction of Relief Pumping Station, Barangay Maysan, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":38367629.52,"abc":39167656.96,"fy":"2024","sd":"02/27/2024","cd":"2024-11-29","lat":14.704649,"lon":120.985069,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2427},{"i":3266,"cid":"23C00188","pid":"P00736016LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 10 + 200 - Sta. 10 + 600, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING / ALLEYWAY CONSTRUCTION","c":96499956.2,"abc":96499959.06,"fy":"2023","sd":"06/05/2023","cd":"2024-02-29","lat":15.216808,"lon":120.985082,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.04,"wp":[15.21649,120.98494],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[3267],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,999,940.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":751},{"i":3267,"cid":"23C00189","pid":"P00736017LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 10 + 600 - Sta. 11 + 000, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96499983.6,"abc":96499994.06,"fy":"2023","sd":"06/05/2023","cd":"2024-02-29","lat":15.216808,"lon":120.985082,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.04,"wp":[15.21649,120.98494],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[3266],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,999,940.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":752},{"i":3268,"cid":"23OE0004","pid":"P00740290LZ","t":"Installation of Booster Pump at Estero de Quiapo Phase III, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FIAT CONSTRUCTION SERVICES","c":72373998.71,"abc":72374399.73,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.597973,"lon":120.985083,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo Phase III","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[3269,3270],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 215,335,536.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":611},{"i":3269,"cid":"23OE0035","pid":"P00726800LZ","t":"Installation of Booster Pump at Estero de Quiapo Phase II, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FIAT CONSTRUCTION SERVICES","c":70586825.43,"abc":72374420.52,"fy":"2023","sd":"03/10/2023","cd":"2023-06-22","lat":14.597973,"lon":120.985083,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo Phase II","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[3268,3270],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 215,335,536.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":612},{"i":3270,"cid":"23OE0036","pid":"P00726799LZ","t":"Installation of Booster Pump at Estero de Quiapo Phase I, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FIAT CONSTRUCTION SERVICES","c":72374712.09,"abc":72374776.28,"fy":"2023","sd":"03/10/2023","cd":"2023-06-23","lat":14.597973,"lon":120.985083,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo Phase I","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase I","dup":[3268,3269],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 215,335,536.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":613},{"i":3271,"cid":"22OH0023","pid":"P00620066LZ","t":"Drainage Improvement along Remedios St. from M. H. del Pilar St. to Remedios Circle, Malate, Manila, Phase II","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":77065181.98,"abc":77200000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-01-13","lat":14.569792,"lon":120.985235,"sm":892,"fm":null,"tm":892,"am":892,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2428},{"i":3272,"cid":"23DQ0057","pid":"P00736024LZ","t":"Construction of Riverbank and Slope Protection along San Isidro River Crossing, Phase 1, Barangay Iba Section, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96499962.16,"abc":96499965.55,"fy":"2023","sd":"04/11/2023","cd":"2024-11-15","lat":14.22667,"lon":120.98529,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":27.38,"wp":[14.47354,121.00247],"wst":"matched","br":"Iba Section","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2429},{"i":3273,"cid":"22OD0174","pid":"P00620392LZ","t":"Construction of Flood Control Wall along Galguera Creek, Brgy. Gen. T. De Leon, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":18989004.18,"abc":19596503.01,"fy":"2022","sd":"03/18/2022","cd":"2022-11-11","lat":14.686636,"lon":120.985368,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Galguera","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gen. T. De Leon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2430},{"i":3274,"cid":"23DQ0017","pid":"P00726570LZ","t":"Construction of Revetment along San Isidro River, Barangay Iba, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":96499032.96,"abc":96499943.8,"fy":"2023","sd":"02/21/2023","cd":"2023-11-17","lat":14.22989,"lon":120.98543,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":27.03,"wp":[14.47354,121.00247],"wst":"matched","br":"Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2431},{"i":3275,"cid":"24OE0005","pid":"P00820087LZ","t":"Installation of Booster Pump at Estero de Quiapo (Package 1a), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":144717637.9,"abc":144749748.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.597036,"lon":120.98562,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo","wn":"Estero de Quiapo","wd":0.01,"wp":[14.59703,120.98556],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3276],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 287,620,432.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":680},{"i":3276,"cid":"24OE0006","pid":"P00820088LZ","t":"Installation of Booster Pump at Estero de Quiapo (Package 1b), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":142902794.3,"abc":144749005.8,"fy":"2024","sd":"02/12/2024","cd":"2024-04-17","lat":14.597036,"lon":120.98562,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo","wn":"Estero de Quiapo","wd":0.01,"wp":[14.59703,120.98556],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3275],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 287,620,432.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":681},{"i":3277,"cid":"23OE0050","pid":"P00725997LZ","t":"Construction of Retarding Basin at Estero de Quiapo, Barangay 383, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":33678257.09,"abc":34299916.3,"fy":"2023","sd":"02/16/2023","cd":"2024-08-19","lat":14.59613,"lon":120.98576,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo","wn":"Estero de Quiapo","wd":0.0,"wp":[14.59612,120.98572],"wst":"matched","br":"383","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":56},{"i":3278,"cid":"23OE0043","pid":"P00725495LZ","t":"Construction of Retarding Basin at Estero de Quiapo, Barangay 384, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":47375366.03,"abc":48248540.52,"fy":"2023","sd":"02/17/2023","cd":"2024-04-07","lat":14.59536,"lon":120.98578,"sm":null,"fm":null,"tm":null,"am":1192,"md":null,"ls":"unknown","ww":"de Quiapo","wn":"Estero de Quiapo","wd":0.0,"wp":[14.59536,120.9858],"wst":"matched","br":"384","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":57},{"i":3279,"cid":"23DQ0074","pid":"P00742427LZ","t":"Construction of Slope Protection Structure along San Isidro River, West Side, Barangay Sabutan, Silang, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":49499413.18,"abc":49499955.68,"fy":"2023","sd":"05/01/2023","cd":"2023-12-23","lat":14.23422,"lon":120.98591,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":26.54,"wp":[14.47354,121.00247],"wst":"matched","br":"Sabutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2432},{"i":3280,"cid":"24OI0014","pid":"P00821041LZ","t":"Construction of Flood Control Structure, Paliwas Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / KPSL GENERAL CONTRACTOR INC.","c":96395127.6,"abc":96400404.85,"fy":"2024","sd":"02/08/2024","cd":"2024-08-28","lat":14.479804,"lon":120.985989,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Paliwas","wn":"Paliwas Creek","wd":0.05,"wp":[14.48002,120.98561],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2433},{"i":3281,"cid":"22OI0104","pid":"P00631010LZ","t":"Rehabilitation of Drainage System, Phase 2, Pulanglupa 2, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"MRJR CONSTRUCTION & TRADING","c":9799014.24,"abc":9799999.82,"fy":"2022","sd":"05/27/2022","cd":"2023-04-16","lat":14.463824,"lon":120.98644,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2434},{"i":3282,"cid":"24CD0103","pid":"P00845783LZ","t":"Bank Improvement along Sta. Maria River and Tributaries, Sta. 09+304 - Sta. 09+708 (San Jose Patag-Pulong Buhangin Section), Sta. Maria, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":98916463.13,"abc":98999835.95,"fy":"2024","sd":"03/18/2024","cd":"2025-04-06","lat":14.843209,"lon":120.986514,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":2.19,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":404.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2435},{"i":3283,"cid":"22OI0002","pid":"P00620908LZ","t":"Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":48997928.47,"abc":48999678.96,"fy":"2022","sd":"04/07/2022","cd":"2022-10-03","lat":14.472976,"lon":120.986618,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Kantarilla","wn":"Kantarilla Creek","wd":1.86,"wp":[14.46735,120.97036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2436},{"i":3284,"cid":"23BC0100","pid":"P00742299LZ","t":"Construction of Slope Protection at the NHA-Pag-Asa Village, Barangay Centro 02, Santa Praxedes, Cagayan","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":14542977.58,"abc":14850000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-09-24","lat":18.556702,"lon":120.986678,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Centro 02","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2437},{"i":3285,"cid":"22DQ0077","pid":"P00639492LZ","t":"Construction of Drainage, Barangay Sabutan, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TCSC CORP.","c":4899931.63,"abc":19599797.32,"fy":"2022","sd":"04/11/2022","cd":"2022-10-17","lat":14.2399,"lon":120.98682,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2438},{"i":3286,"cid":"25OE0042","pid":"P00920053LZ","t":"Upgrading of Lerma Pumping Station, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":47318052.55,"abc":48249977.78,"fy":"2025","sd":"02/12/2025","cd":"2025-04-02","lat":14.605061,"lon":120.98691,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":58},{"i":3287,"cid":"20EB0049","pid":"P00421954LZ","t":"Construction of Flood Control Project, Busuanga River (Adela Section), Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Rizal","deo":"Mindoro Occidental District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":48999488.98,"abc":49000000.0,"fy":"2020","sd":"02/24/2020","cd":"2022-11-27","lat":12.43611,"lon":120.98694,"sm":1210,"fm":null,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Busuanga","wn":"Busuanga River","wd":0.05,"wp":[12.43625,120.98649],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2439},{"i":3288,"cid":"22OH0108","pid":"P00620454LZ","t":"Rehabilitation of Drainage Structure, Barangay 648, San Miguel, Manila Phase II","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":19235550.06,"abc":19799898.48,"fy":"2022","sd":"06/08/2022","cd":"2022-08-08","lat":14.593894,"lon":120.987041,"sm":1336,"fm":null,"tm":1336,"am":1336,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"648","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2440},{"i":3289,"cid":"23OH0029","pid":"P00737401LZ","t":"Rehabilitation of Drainage Structure, Barangay 648, San Miguel, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":19793655.7,"abc":19799999.93,"fy":"2023","sd":"02/21/2023","cd":"2023-08-23","lat":14.593904,"lon":120.987101,"sm":1336,"fm":null,"tm":1336,"am":1336,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"648","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2441},{"i":3290,"cid":"22BC0026","pid":"P00621036LZ","t":"Construction of Langgangan Flood Control along Langgangan River, Sta.0+000 - Sta. 0+418 (Section 1), Sta. 0+000 - Sta. 0+025 (Section 2), Sta. 0+000 - Sta. 0+132 (Section 3), Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"NCL BUILDERS AND CONSTRUCTION SUPPLY","c":14356020.0,"abc":14356020.0,"fy":"2022","sd":"03/29/2022","cd":"2023-03-10","lat":18.566384,"lon":120.987187,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":"Langgangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":575.0,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2442},{"i":3291,"cid":"23EB0026","pid":"P00726766LZ","t":"Construction of Anahawin Flood Control Structure (Poypoy East and West Section), Sta. 0 + 000 - Sta. 0 + 682, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION","c":44848347.79,"abc":45080000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-07-15","lat":12.622526,"lon":121.00539,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":682.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2443},{"i":3292,"cid":"23OE0030","pid":"P00740291LZ","t":"Installation of Booster Pump at Estero de Quiapo Phase IV, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FIAT CONSTRUCTION SERVICES","c":70920836.76,"abc":72374816.16,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Quiapo Phase IV","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[3194,3198,3212,3297,3302,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":179},{"i":3293,"cid":"22OF0019","pid":"P00620926LZ","t":"Construction of Flood Control Structure and Tributaries along San Francisco River (Phase II), Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.)","c":48019939.82,"abc":48019939.82,"fy":"2022","sd":"02/07/2022","cd":"2022-11-21","lat":14.653271,"lon":121.016582,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.16,"wp":[14.65466,121.01638],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2444},{"i":3294,"cid":"22OF0113","pid":"P00620927LZ","t":"Construction of Flood Control Structure and Tributaries along San Francisco River (Phase III), Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:LARSEN-DUTCHER CONSTRACTOR) / DREAMWORX BUILDER & TRADING, INC.","c":46581350.46,"abc":48019938.26,"fy":"2022","sd":"03/23/2022","cd":"2023-04-26","lat":14.653262,"lon":121.016588,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.16,"wp":[14.65466,121.01638],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2445},{"i":3295,"cid":"23OC0045","pid":"P00742241LZ","t":"Construction of Drainage System along Vitalez Compound Road and its Vicinity, Brgy. Vitalez, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ILFREO CONSTRUCTION CORP. (FORMERLY:ILFREO CONSTRUCTION & TRADING CORP.)","c":5048995.64,"abc":5049000.0,"fy":"2023","sd":"08/14/2023","cd":"2024-03-07","lat":14.510692,"lon":121.005402,"sm":411,"fm":411,"tm":411,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Vitalez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2446},{"i":3296,"cid":"22OC0013","pid":"P00632694LZ","t":"Construction of Drainage Main along H. Santos St. towards Barangay Carmona Pumping Station Including One (1) Unit Additional Pump and Sump Pit with Accessories, Barangay Carmona, Makati City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":69291965.57,"abc":67550000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-13","lat":14.57517,"lon":121.0166,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carmona Pumping Station Including One","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02579,"text":"Contract cost is 2.58% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":550},{"i":3297,"cid":"23OE0032","pid":"P00740285LZ","t":"Installation of Booster Pump at Estero de Binondo Phase III, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":70521409.22,"abc":72373962.3,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo Phase III","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[3194,3198,3212,3292,3302,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":180},{"i":3298,"cid":"23OE0088","pid":"P00727026LZ","t":"Construction of Box Culvert along Makisig St., Phase I, Bacood, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":39158630.18,"abc":39199374.54,"fy":"2023","sd":"03/01/2023","cd":"2023-11-08","lat":14.589078,"lon":121.016629,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":59},{"i":3299,"cid":"21OC0044","pid":"P00525758LZ","t":"Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 1), Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":19598319.74,"abc":19600000.0,"fy":"2021","sd":"03/22/2022","cd":"2022-09-27","lat":14.470577,"lon":121.038383,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.92,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[3125,3152,3172,3393,3891,3934,3983],"L":"field","s":16,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1124},{"i":3300,"cid":"23CE0019","pid":"P00726171LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay San Nicolas, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) / DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":48995000.0,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-16","lat":15.724858,"lon":121.00557,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.23,"wp":[15.72527,121.00344],"wst":"matched","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2447},{"i":3301,"cid":"22OC0005","pid":"P00620020LZ","t":"Construction of Drainage Main along A.P. Reyes Avenue (North Bound) from H. Santos St. Drainage Main towards J.P. Rizal Avenue, District I, Makati City, Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":72364843.39,"abc":72375000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-10-24","lat":14.575138,"lon":121.016649,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2448},{"i":3302,"cid":"23OE0033","pid":"P00740283LZ","t":"Installation of Booster Pump at Estero de Binondo (Phase V), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":72291429.13,"abc":72374153.2,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.60223,120.97142],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[3194,3198,3212,3292,3297,3305],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":181},{"i":3303,"cid":"24OC0026","pid":"P00820570LZ","t":"Construction of Revetment Wall along Don Galo River from Rodriguez to Multinational Ave., (Phase II), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":32931552.36,"abc":34300000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-06","lat":14.49743,"lon":121.00561,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":0.63,"wp":[14.49396,121.00096],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2449},{"i":3304,"cid":"24CD0015","pid":"P00821581LZ","t":"Construction of Flood Control Structure along Angat River, Brgy. Marungko, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48249073.18,"abc":48249897.83,"fy":"2024","sd":"04/08/2024","cd":"2024-11-07","lat":14.94652,"lon":121.016688,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.94655,121.017],"wst":"matched","br":"Marungko","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2450},{"i":3305,"cid":"23OE0034","pid":"P00740284LZ","t":"Installation of Booster Pump at Estero de Binondo (Phase VI), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":70404227.68,"abc":72374315.67,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.60221,"lon":120.9714,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.60223,120.97142],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[3194,3198,3212,3292,3297,3302],"run":[],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 498,760,144.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":182},{"i":3306,"cid":"24OF0085","pid":"P00844687LZ","t":"Construction of Drainage Systems at Capricorn and Various Connecting Drainages, Brgy. Tandang Sora, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":9799570.63,"abc":9799939.4,"fy":"2024","sd":"02/23/2024","cd":"2024-06-20","lat":14.68557,"lon":121.03848,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2451},{"i":3307,"cid":"24OH0020","pid":"P00820659LZ","t":"Construction of Drainage System, Laura St., (Beata St. to Menandro) Pandacan, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":39197819.94,"abc":39199863.76,"fy":"2024","sd":"02/23/2024","cd":"2024-07-17","lat":14.590871,"lon":121.005614,"sm":1079,"fm":null,"tm":1079,"am":1079,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2452},{"i":3308,"cid":"24OE0167","pid":"P00845868LZ","t":"Rehabilitation of Drainage System, Barangay 1-146, Tondo, Manila  (Phase II)","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JMRP CONSTRUCTION SERVICES","c":98998433.15,"abc":98999294.21,"fy":"2024","sd":"02/20/2024","cd":"2024-07-11","lat":14.606775,"lon":120.971493,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1-146","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":60},{"i":3309,"cid":"22OC0191","pid":"P00640486LZ","t":"Construction of Flood Mitigation Structure, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"10/10/2022","cd":"2023-02-06","lat":14.476142,"lon":121.016698,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2453},{"i":3310,"cid":"22OF0022","pid":"P00620440LZ","t":"Construction of Flood Control Structure and Tributaries along Culiat Creek (Left Side) Barangay Bahay Toro, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:LARSEN-DUTCHER CONSTRACTOR)","c":42777000.0,"abc":44100000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-10-21","lat":14.666024,"lon":121.038497,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Culiat","wn":"Culiat Creek","wd":0.0,"wp":[14.66601,121.03849],"wst":"matched","br":"Bahay Toro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2454},{"i":3311,"cid":"22OH0024","pid":"P00620014LZ","t":"Construction (Completion) of Slope Protection Structure/Bank Improvement/Sheet Piling of Maricaban Creek (Sta. 0+000 to 0+234), Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"CAANA CONSTRUCTION CORPORATION","c":52318093.71,"abc":52323615.95,"fy":"2022","sd":"02/28/2022","cd":"2022-08-31","lat":14.532382,"lon":121.00585,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53238,121.00585],"wst":"matched","br":null,"len":234.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2455},{"i":3312,"cid":"23DQ0007","pid":"P00737514LZ","t":"Construction of Drainage, Tubuan III, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":4949896.9,"abc":19799810.39,"fy":"2023","sd":"02/15/2023","cd":"2023-08-17","lat":14.21525,"lon":120.9715,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2456},{"i":3313,"cid":"22CD0070","pid":"P00631222LZ","t":"Construction of Flood Control Structures along Angat River (Marungko Section), Sta. 09+000 - Sta. 09+300, Marungko, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":18338920.48,"abc":18619705.64,"fy":"2022","sd":"03/07/2022","cd":"2022-08-10","lat":14.94541,"lon":121.01693,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.02,"wp":[14.94543,121.01711],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2457},{"i":3314,"cid":"23OB0107","pid":"P00725970LZ","t":"Construction (Completion) of Flood Control, Brgy. Little Baguio, San Juan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":33505657.17,"abc":35279959.91,"fy":"2023","sd":"02/06/2023","cd":"2023-06-18","lat":14.603652,"lon":121.038742,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Little Baguio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2458},{"i":3315,"cid":"23EB0030","pid":"P00727377LZ","t":"Construction of Busuanga Flood Control Structure (San Pedro Section), Sta. 0 + 000 - Sta. 0 + 320, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / MIGHTY DRAGON BUILDERS INC.","c":45079355.23,"abc":45080000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-07-17","lat":12.455342,"lon":121.016952,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":320.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2459},{"i":3316,"cid":"24OH0043","pid":"P00820662LZ","t":"Construction of Drainage System, Zone 91, Pandacan, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":24492317.29,"abc":24499603.47,"fy":"2024","sd":"02/21/2024","cd":"2024-04-30","lat":14.593282,"lon":121.005998,"sm":1079,"fm":null,"tm":1079,"am":1079,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2460},{"i":3317,"cid":"24CD0131","pid":"P00844746LZ","t":"Construction of Flood Control Structure along Sta. Maria River, Sta. 04+900 - Sta. 05+050 (Poblacion - Macaiban Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":48998501.05,"abc":48999987.58,"fy":"2024","sd":"03/25/2024","cd":"2024-07-09","lat":14.816723,"lon":120.971512,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.03,"wp":[14.81646,120.97159],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2461},{"i":3318,"cid":"24OD0071","pid":"P00820597LZ","t":"Construction of Flood Control Wall along the Banks of Creeks along Palmera, Barangay 175 (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":47975930.1,"abc":48975949.56,"fy":"2024","sd":"02/27/2024","cd":"2024-05-19","lat":14.754276,"lon":121.038962,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2462},{"i":3319,"cid":"23OE0048","pid":"P00740282LZ","t":"Construction of Retention Basin at Estero dela Reina, (Phase XIV), Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / MANGEN TECHNO-BUILDERS INC.","c":94942061.84,"abc":96499755.21,"fy":"2023","sd":"03/28/2023","cd":"2024-05-01","lat":14.609901,"lon":120.971535,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.6099,120.97158],"wst":"matched","br":null,"len":null,"ph":"Phase XIV","dup":[],"run":[3951,3928,3162],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0045 to 23OE0048) cover the same site, together worth PHP 350,867,677.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":330},{"i":3320,"cid":"22OC0007","pid":"P00620037LZ","t":"Construction of Revetment Wall Along Maricaban Creek Makati Side (Phase 5), Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":87811870.7,"abc":87815000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":14.530208,"lon":121.017191,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.01,"wp":[14.53015,121.01724],"wst":"matched","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2463},{"i":3321,"cid":"23CE0022","pid":"P00726170LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay San Agustin, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / IJK MAE CONSTRUCTION INC.","c":48999995.55,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-09-06","lat":15.809462,"lon":121.017617,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.8098,121.01747],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2464},{"i":3322,"cid":"24OE0059","pid":"P00820010LZ","t":"Construction of Drainage along Anonas St., Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":67202179.61,"abc":67549628.75,"fy":"2024","sd":"02/07/2024","cd":"2024-12-13","lat":14.59893,"lon":121.00619,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":61},{"i":3323,"cid":"22OC0028","pid":"P00620379LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Amapola St. and its Vicinity, Brgy. Guadalupe Viejo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":11171751.54,"abc":11760000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-10-06","lat":14.56285,"lon":121.039167,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Viejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2465},{"i":3324,"cid":"23OE0037","pid":"P00740298LZ","t":"Installation of Booster Pump at Estero Dela Reina, Phase VII, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / D.T. RECIO INCORPORATED","c":96198358.4,"abc":96499593.7,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.609733,"lon":120.971545,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"Dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60974,120.97159],"wst":"matched","br":null,"len":null,"ph":"Phase VII","dup":[3329,3332],"run":[3329,3833],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 287,339,054.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OE0037 to 23OE0039) cover the same site, together worth PHP 264,826,177.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":37},{"i":3325,"cid":"21OF0209","pid":"P00525836LZ","t":"Construction of Slope Protection in Marikina River, Sta. 20+400 - Sta. 20+450, Barangay Bagong Silangan, Quezon City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":27189705.07,"abc":28625800.0,"fy":"2021","sd":"03/22/2022","cd":"2022-12-16","lat":14.635036,"lon":121.017968,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":6.82,"wp":[14.61676,121.07845],"wst":"matched","br":"Bagong Silangan","len":50.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":6.82,"text":"The title names Marikina, which OpenStreetMap maps through the stated municipality, but the pin is 6.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":352},{"i":3326,"cid":"24OD0018","pid":"P00820598LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Barangay 166, (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":47951831.23,"abc":48980440.84,"fy":"2024","sd":"02/27/2024","cd":"2024-07-22","lat":14.72693,"lon":121.006615,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"166","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2466},{"i":3327,"cid":"23OB0108","pid":"P00725519LZ","t":"Rehabilitation of Slope Protection along Ermitaño Creek, San Juan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. BERNARDO CONST., INC.","c":59589301.21,"abc":62724943.96,"fy":"2023","sd":"02/13/2023","cd":"2024-02-11","lat":14.597447,"lon":121.039246,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Ermitaño","wn":"Ermitaño Creek","wd":0.0,"wp":[14.59745,121.03922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2467},{"i":3328,"cid":"23DI0149","pid":"P00725824LZ","t":"Construction of Flood Protection Structure Phase 2, (Biñan-Carmona Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":96489102.22,"abc":96500000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-02-08","lat":14.270456,"lon":121.039394,"sm":371,"fm":371,"tm":371,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2468},{"i":3329,"cid":"23OE0038","pid":"P00740295LZ","t":"Installation of Booster Pump at Estero Dela Reina, Phase IX, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / COSMAN BUILDERS","c":96411549.07,"abc":96499611.62,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.609733,"lon":120.971545,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"Dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60974,120.97159],"wst":"matched","br":null,"len":null,"ph":"Phase IX","dup":[3324,3332],"run":[3324,3833],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 287,339,054.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OE0037 to 23OE0039) cover the same site, together worth PHP 264,826,177.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":38},{"i":3330,"cid":"24OC0030","pid":"P00820571LZ","t":"Construction of Revetment Wall along Moonwalk Creek near Airport Village, Barangay Moonwalk, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29394774.79,"abc":29400000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-05-20","lat":14.49289,"lon":121.018133,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Moonwalk","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Moonwalk","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2469},{"i":3331,"cid":"22OI0055","pid":"P00620910LZ","t":"Construction of Flood Control Structure, Mahabang Ilog, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48991818.78,"abc":48999195.3,"fy":"2022","sd":"02/09/2022","cd":"2022-09-06","lat":14.428546,"lon":121.006989,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2470},{"i":3332,"cid":"23OE0059","pid":"P00740299LZ","t":"Installation of Booster Pump at Estero Dela Reina, Phase VIII, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"LQG TRADING AND CONSTRUCTION / ST. TIMOTHY CONSTRUCTION CORPORATION","c":94729146.04,"abc":96499482.71,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":14.609733,"lon":120.971545,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"Dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60974,120.97159],"wst":"matched","br":null,"len":null,"ph":"Phase VIII","dup":[3324,3329],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 287,339,054.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":551},{"i":3333,"cid":"22OC0172","pid":"P00621130LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Villanueva Creek, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":96496182.97,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-05-17","lat":14.469746,"lon":121.007055,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.39,"wp":[14.47285,121.00875],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2471},{"i":3334,"cid":"22DI0053","pid":"P00620585LZ","t":"Construction of River Protection Structure along San Isidro River, (near Land Fill Area) San Antonio, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":43345890.0,"abc":44100000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-18","lat":14.33879,"lon":121.01847,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":15.01,"wp":[14.47354,121.00247],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2472},{"i":3335,"cid":"22OC0148","pid":"P00637041LZ","t":"Construction of Flood Mitigation Structures and Groundsill at Moonwalk Creek - Merville Creek Junction, District 2, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"GMO CONSTRUCTION","c":24499855.4,"abc":24500000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-11-16","lat":14.492911,"lon":121.018781,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Moonwalk","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2473},{"i":3336,"cid":"22OH0027","pid":"P00620110LZ","t":"Construction of Slope Protection Structure/Bank Improvement/Sheet Piling of Maricaban Creek (Sta. 0+234 to 0+468), Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":57863665.29,"abc":57895380.25,"fy":"2022","sd":"03/02/2022","cd":"2022-09-07","lat":14.531809,"lon":121.007079,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53181,121.00708],"wst":"matched","br":null,"len":234.0,"ph":null,"dup":[3339],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 81,772,041.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1076},{"i":3337,"cid":"24CE0126","pid":"P00823473LZ","t":"Construction of Flood Control Structure along Labong River, Barangay Manacsac, Guimba, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GUIMBA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":47762663.9,"abc":48250000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-12-23","lat":15.590727,"lon":120.971618,"sm":598,"fm":598,"tm":598,"am":1526,"md":14.77,"ls":"outside","ww":"Labong","wn":"Labong River","wd":23.52,"wp":[15.55864,120.75488],"wst":"matched","br":"Manacsac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.89,"value":14.77,"text":"The pin is 14.8 km outside Guimba, Nueva Ecija, the nearest municipality the record claims. It falls in Talavera, Nueva Ecija.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":217},{"i":3338,"cid":"22OC0180","pid":"P00525480LZ","t":"Construction of Drainage Main along A.P. Reyes Avenue (South Bound) from H. Santos St. Drainage Main towards J.P. Rizal Avenue, District I, Makati City, Metro Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":72368946.37,"abc":73500000.0,"fy":"2021","sd":"06/22/2022","cd":"2022-12-13","lat":14.578061,"lon":121.018842,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2474},{"i":3339,"cid":"23OH0018","pid":"P00726038LZ","t":"Construction of Slope Protection Structure of Maricaban Creek (Sta. 0+232 to Sta. 0+468), Pasay City (Phase 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":23908375.76,"abc":24496286.89,"fy":"2023","sd":"02/21/2023","cd":"2023-07-20","lat":14.531809,"lon":121.007079,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53181,121.00708],"wst":"matched","br":null,"len":236.0,"ph":"Phase 2","dup":[3336],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 81,772,041.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1125},{"i":3340,"cid":"24DI0001","pid":"P00820891LZ","t":"Construction of River Protection Structure at Barangay San Francisco, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":11709794.19,"abc":11760000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-13","lat":14.323961,"lon":121.039553,"sm":371,"fm":371,"tm":371,"am":343,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2475},{"i":3341,"cid":"22CE0027","pid":"P00620537LZ","t":"Construction of Flood Mitigation Structure along Talavera River, Brgy. Pantoc Bulac, Talavera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"TALAVERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-09-01","lat":15.662598,"lon":120.972031,"sm":1526,"fm":1526,"tm":1526,"am":1526,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.08,"wp":[15.66259,120.97278],"wst":"matched","br":"Pantoc Bulac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2476},{"i":3342,"cid":"23C00187","pid":"P00726501LZ","t":"Construction of Flood Control Structure along Angat River, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"GLOBALCRETE BUILDERS INC.","c":96492940.3,"abc":96499956.22,"fy":"2023","sd":"06/05/2023","cd":"2024-10-07","lat":14.961247,"lon":121.018875,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.57,"wp":[14.95757,121.01518],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2477},{"i":3343,"cid":"24OH0088","pid":"P00843174LZ","t":"Improvement of Villamor Golf Course Drainage System (Phase 2), Pasay City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / FS CO BUILDERS AND SUPPLY","c":96400267.28,"abc":96499999.03,"fy":"2024","sd":"05/06/2024","cd":"2024-11-19","lat":14.529232,"lon":121.01908,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2478},{"i":3344,"cid":"21OC0147","pid":"P00561203LZ","t":"Construction of Drainage Main Along Gil Puyat Avenue Including Raising of Grade From South Super Highway (SSH) Towards Estero De Tripa De Gallina, Barangay San Isidro, Makati City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":69300000.0,"abc":69300000.0,"fy":"2021","sd":"04/12/2021","cd":"2022-11-28","lat":14.557727,"lon":121.007255,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"De Tripa De","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2479},{"i":3345,"cid":"22OF0030","pid":"P00620445LZ","t":"Construction of Revetment along Dario Creek, Sta. 0+020.000 to Sta. 0+351.894 (Left & Right River Bank), Quezon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":19013963.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-09-27","lat":14.651891,"lon":121.019095,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Dario","wn":"Dario Creek","wd":0.52,"wp":[14.6545,121.01504],"wst":"matched","br":null,"len":331.9,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2480},{"i":3346,"cid":"22OD0040","pid":"P00620399LZ","t":"Construction of Flood Control Wall along the Banks of Creeks along Shelterville Creek, Brgy. 171 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":43670120.16,"abc":45067205.88,"fy":"2022","sd":"02/08/2022","cd":"2022-11-28","lat":14.729752,"lon":121.039643,"sm":308,"fm":308,"tm":308,"am":1191,"md":0.72,"ls":"boundary","ww":"Shelterville","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"171","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2481},{"i":3347,"cid":"22CC0215","pid":"P00639351LZ","t":"Construction of Riverbank Protection along Bocaue River Brgy. Caingin Bocaue, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"BOCAUE (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":57899074.35,"abc":57899561.65,"fy":"2022","sd":"04/04/2022","cd":"2023-01-27","lat":14.798695,"lon":120.972112,"sm":216,"fm":216,"tm":248,"am":1395,"md":1.69,"ls":"adjacent","ww":"Bocaue","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caingin Bocaue","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.99,"text":"The record contradicts itself: the municipality field and the pin point to Bocaue, Bulacan, but the title names Bulacan, Bulacan, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":498},{"i":3348,"cid":"23EB0038","pid":"P00726596LZ","t":"Construction of Tanyag Flood Control Structure along Lumintao River, Barangay Proper, Sta. 0 + 000 - Sta. 0 + 633, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":49213204.69,"abc":49215000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-07-15","lat":12.561343,"lon":121.019278,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.09,"wp":[12.56086,121.0199],"wst":"matched","br":"Proper","len":633.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2482},{"i":3349,"cid":"22E00007","pid":"P00630955LZ","t":"Construction of Flood Control Structure along Lumintao River, Barangay Tanyag, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":130274621.5,"abc":130274599.7,"fy":"2022","sd":"02/23/2022","cd":"2022-08-31","lat":12.568288,"lon":121.040083,"sm":307,"fm":307,"tm":307,"am":1210,"md":0.09,"ls":"boundary","ww":"Lumintao","wn":"Lumintao River","wd":0.12,"wp":[12.56933,121.03968],"wst":"matched","br":"Tanyag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2483},{"i":3350,"cid":"22OC0136","pid":"P00637758LZ","t":"Construction of Revetment Wall Along Balisampan Creek, Brgy. Guadalupe Viejo, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING) / RJM CONSTRUCTION AND DEV'T., INC.","c":48019963.25,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-03-16","lat":14.567191,"lon":121.040133,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.01,"wp":[14.56723,121.04011],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2484},{"i":3351,"cid":"23OC0017","pid":"P00725528LZ","t":"Construction of Revetment Wall along Balisampan Creek, Barangay Guadalupe Viejo, Makati City (Phase II)","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":66566424.62,"abc":66585000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-19","lat":14.5667,"lon":121.0402,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.0,"wp":[14.56666,121.04019],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":"Phase II","dup":[],"run":[3364,3360],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OC0017 to 23OC0019) cover the same site, together worth PHP 191,716,641.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":429},{"i":3352,"cid":"24OC0078","pid":"P00820049LZ","t":"Construction of Flood Mitigation Structure (Installation of Trash Screen) at Balisampan Creek, Barangay Guadalupe Viejo, Makati City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":48021877.09,"abc":48892690.0,"fy":"2024","sd":"07/04/2024","cd":"2025-02-28","lat":14.567462,"lon":121.040249,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.01,"wp":[14.56747,121.0402],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2485},{"i":3353,"cid":"22OF0067","pid":"P00631044LZ","t":"Rehabilitation of Drainage, De Jesus St. and Judge Juan Luna St., Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"VERDAX BUILDERS","c":14259000.0,"abc":14700000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-11","lat":14.657789,"lon":121.040268,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2486},{"i":3354,"cid":"23OB0422","pid":"P00726789LZ","t":"Construction of Flood Control Structure at Ermitaño Creek, Brgy. Addition Hills, San Juan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":44096995.9,"abc":46418427.15,"fy":"2023","sd":"03/22/2023","cd":"2024-02-12","lat":14.596068,"lon":121.04028,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Ermitaño","wn":"Ermitaño Creek","wd":0.0,"wp":[14.59607,121.04028],"wst":"matched","br":"Addition Hills","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2487},{"i":3355,"cid":"22OF0075","pid":"P00630925LZ","t":"Rehabilitation of Flood Control Structure, Barangay Gulod, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":73477621.25,"abc":75750125.0,"fy":"2022","sd":"02/16/2022","cd":"2023-02-28","lat":14.716896,"lon":121.040407,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gulod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2488},{"i":3356,"cid":"22OD0096","pid":"P00620402LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 166 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":28752819.36,"abc":29399620.35,"fy":"2022","sd":"02/08/2022","cd":"2022-12-26","lat":14.72675,"lon":121.00734,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"166","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2489},{"i":3357,"cid":"24OC0014","pid":"P00823262LZ","t":"Construction of Revetment Wall along Balisampan Creek (Phase V), Barangay Guadalupe Viejo, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":48889975.99,"abc":48893655.0,"fy":"2024","sd":"02/20/2024","cd":"2024-06-20","lat":14.563617,"lon":121.040763,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.01,"wp":[14.56359,121.04072],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2490},{"i":3358,"cid":"24OG0006","pid":"P00839537LZ","t":"Rehabilitation of Drainage System, Barangay Sacred Heart, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":29681398.6,"abc":29699842.38,"fy":"2024","sd":"02/08/2024","cd":"2025-01-07","lat":14.630642,"lon":121.041009,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sacred Heart","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2491},{"i":3359,"cid":"23OD0036","pid":"P00725546LZ","t":"Construction of Flood Control Structure along the Banks of Creeks Robes, Barangay 175, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":68514284.13,"abc":69912555.11,"fy":"2023","sd":"02/21/2023","cd":"2023-10-16","lat":14.770857,"lon":121.041068,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2492},{"i":3360,"cid":"23OC0019","pid":"P00725530LZ","t":"Construction of Revetment Wall along Balisampan Creek, Barangay Guadalupe Viejo, Makati City (Phase IV)","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":58565217.84,"abc":58571640.0,"fy":"2023","sd":"02/15/2023","cd":"2023-11-03","lat":14.56475,"lon":121.04109,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.0,"wp":[14.56476,121.04107],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":"Phase IV","dup":[],"run":[3351,3364],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OC0017 to 23OC0019) cover the same site, together worth PHP 191,716,641.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":430},{"i":3361,"cid":"23DI0127","pid":"P00727165LZ","t":"Rehabilitation of Flood Mitigation Structure, Litlit Creek, San Pedro City, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"DATZLAV CONSTRUCTION","c":28606212.0,"abc":29400000.0,"fy":"2023","sd":"06/07/2023","cd":"2024-01-14","lat":14.357078,"lon":121.041147,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"Litlit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2493},{"i":3362,"cid":"22CD0004","pid":"P00620162LZ","t":"Construction of Flood Control Structure, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road San Jose River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94174761.35,"abc":94176929.31,"fy":"2022","sd":"03/07/2022","cd":"2023-03-11","lat":14.78445,"lon":121.04118,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Ipo Dam Road San Jose","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2494},{"i":3363,"cid":"24OC0059","pid":"P00820573LZ","t":"Rehabilitation of Drainage System along Dao Street including Laterals (Phase II), Barangay San Martin de Porres, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"THE STEADFAST BUILDERS","c":18655280.0,"abc":18655280.0,"fy":"2024","sd":"09/06/2024","cd":"2025-02-02","lat":14.500471,"lon":121.041243,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Martin de Porres","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2495},{"i":3364,"cid":"23OC0018","pid":"P00725529LZ","t":"Construction of Revetment Wall along Balisampan Creek, Barangay Guadalupe Viejo, Makati City (Phase III)","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":66584998.99,"abc":66585000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-11","lat":14.56602,"lon":121.04127,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Balisampan","wn":"Balisampan Creek","wd":0.0,"wp":[14.566,121.04125],"wst":"matched","br":"Guadalupe Viejo","len":null,"ph":"Phase III","dup":[],"run":[3351,3360],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OC0017 to 23OC0019) cover the same site, together worth PHP 191,716,641.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":431},{"i":3365,"cid":"23OB0423","pid":"P00726788LZ","t":"Construction of Flood Control Structure at Ermitaño Creek, Brgy. Little Baguio, San Juan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAWAO BUILDERS / DRJY CONSTRUCTION","c":91675968.42,"abc":96499931.38,"fy":"2023","sd":"03/22/2023","cd":"2024-03-24","lat":14.601964,"lon":121.041283,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Ermitaño","wn":"Ermitaño Creek","wd":0.01,"wp":[14.602,121.04135],"wst":"matched","br":"Little Baguio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2496},{"i":3366,"cid":"23OD0073","pid":"P00735955LZ","t":"Construction of Flood Control Wall along Sitio Matarik Creek, Sta. 0 + 484 - Sta. 0 + 971, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":79754179.55,"abc":81987797.59,"fy":"2023","sd":"02/21/2023","cd":"2023-12-12","lat":14.769825,"lon":121.041682,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Sitio Matarik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":487.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2497},{"i":3367,"cid":"22OB0025","pid":"P00620358LZ","t":"Construction of Drainage of National Center for Mental Health Roads, Mandaluyong City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MANDALUYONG CITY","mu":"CITY OF MANDALUYONG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"5.J.B.P. PREMIUM CONSTRUCTION CORPORATION","c":27918834.88,"abc":29399660.98,"fy":"2022","sd":"02/08/2022","cd":"2023-01-30","lat":14.581717,"lon":121.041893,"sm":402,"fm":402,"tm":402,"am":402,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2498},{"i":3368,"cid":"24OD0058","pid":"P00820041LZ","t":"Construction of Flood Control Wall along the Banks of Creeks along Matarik, Barangay 175 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":85027887.13,"abc":86847956.29,"fy":"2024","sd":"02/14/2024","cd":"2024-10-09","lat":14.768981,"lon":121.042023,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2499},{"i":3369,"cid":"22CD0006","pid":"P00620166LZ","t":"Construction of Flood Control Structure, Sto Cristo River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":94554016.97,"abc":94569696.41,"fy":"2022","sd":"03/07/2022","cd":"2022-12-12","lat":14.83059,"lon":121.04227,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Sto Cristo","wn":"Santo Cristo Creek","wd":19.28,"wp":[14.65788,121.01883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2500},{"i":3370,"cid":"22CD0005","pid":"P00620170LZ","t":"Construction of Flood Control Structures, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Sto. Cristo River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":94070857.03,"abc":94087086.97,"fy":"2022","sd":"03/07/2022","cd":"2022-12-11","lat":14.8302,"lon":121.04233,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Ipo Dam Road Sto. Cristo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2501},{"i":3371,"cid":"23OD0085","pid":"P00725554LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 172, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":89748679.99,"abc":91667904.39,"fy":"2023","sd":"02/21/2023","cd":"2023-12-19","lat":14.74536,"lon":121.042398,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"172","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2502},{"i":3372,"cid":"22DI0115","pid":"P00639493LZ","t":"Construction of Revetment/Floodwall (Staggered), Biñan City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"DATZLAV CONSTRUCTION","c":34278213.8,"abc":34300000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-02-26","lat":14.27484,"lon":121.04253,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2503},{"i":3373,"cid":"22DI0096","pid":"P00639494LZ","t":"Construction of Revetment/Floodwall at Brgy. Biñan, Biñan City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":29377630.73,"abc":29400000.0,"fy":"2022","sd":"06/23/2022","cd":"2023-02-15","lat":14.27618,"lon":121.04279,"sm":371,"fm":371,"tm":371,"am":343,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biñan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2504},{"i":3374,"cid":"23DI0148","pid":"P00725823LZ","t":"Construction of Flood Protection Structure Phase 1, (Biñan-Carmona Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":96496542.37,"abc":96500000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-03-04","lat":14.274667,"lon":121.042792,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2505},{"i":3375,"cid":"24OF0132","pid":"P00820027LZ","t":"Construction of Flood Control Structure along Tullahan River and Tributaries, Barangay Gulod, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":143273224.8,"abc":144749671.4,"fy":"2024","sd":"03/18/2024","cd":"2024-11-18","lat":14.713253,"lon":121.042942,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":0.02,"wp":[14.7132,121.04307],"wst":"matched","br":"Gulod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2506},{"i":3376,"cid":"23OD0121","pid":"P00736166LZ","t":"Construction of Drainage System along Coaster St., Barangay 175, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"D.C. SANDIL CONSTRUCTION AND REALTY DEVELOPMENT, I","c":24003340.64,"abc":24499344.34,"fy":"2023","sd":"03/17/2023","cd":"2023-12-25","lat":14.767243,"lon":121.043,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2507},{"i":3377,"cid":"24OF0019","pid":"P00820625LZ","t":"Construction of Flood Control Structure along Tullahan River, Bagong Tulay, Barangay Gulod, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":48416798.62,"abc":48999897.4,"fy":"2024","sd":"02/06/2024","cd":"2024-11-18","lat":14.713276,"lon":121.043021,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":0.01,"wp":[14.71324,121.04309],"wst":"matched","br":"Gulod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2508},{"i":3378,"cid":"24CD0175","pid":"P00844750LZ","t":"Construction of Flood Control Structure, Barangay Poblacion, San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"1199S CONSTRUCTION","c":19303548.04,"abc":19599500.5,"fy":"2024","sd":"04/30/2024","cd":"2024-10-14","lat":14.808045,"lon":121.043275,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2509},{"i":3379,"cid":"23OD0072","pid":"P00725555LZ","t":"Construction of Flood Control Wall along the Banks of Matarik Creek, Brgy. 176, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":89183418.68,"abc":91667691.68,"fy":"2023","sd":"02/21/2023","cd":"2023-11-06","lat":14.769825,"lon":121.043383,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Matarik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"176","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2510},{"i":3380,"cid":"22OC0043","pid":"P00632713LZ","t":"Rehabilitation of Drainage Along Anastacio Street, Barangay Guadalupe Nuevo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":9815215.1,"abc":9800000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-09-06","lat":14.559971,"lon":121.043454,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Nuevo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2511},{"i":3381,"cid":"22OC0034","pid":"P00620385LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Gov. Noble St. and its Vicinity, Brgy. Guadalupe Nuevo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":4880675.03,"abc":4900000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-08-18","lat":14.560545,"lon":121.043509,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Nuevo","len":null,"ph":null,"dup":[],"run":[3384,3126],"cl":[],"L":"field","s":28,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0034 to 22OC0038) cover the same site, together worth PHP 47,011,876.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":753},{"i":3382,"cid":"24OB0172","pid":"P00821048LZ","t":"Construction of Slope Protection along C-6 Open Channel (Phase 9), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94550181.71,"abc":96499471.03,"fy":"2024","sd":"02/13/2024","cd":"2024-07-22","lat":14.5824,"lon":121.0436,"sm":1521,"fm":1521,"tm":1521,"am":402,"md":4.39,"ls":"outside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 9","dup":[],"run":[3819,3852],"cl":[],"L":"records","s":67,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.71,"value":4.39,"text":"The pin is 4.4 km outside Taguig City, NCR, Fourth District, the nearest municipality the record claims. It falls in City of Mandaluyong, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0170 to 24OB0172) cover the same site, together worth PHP 283,640,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":59},{"i":3383,"cid":"22CD0065","pid":"P00631223LZ","t":"Construction of Flood Control Structures along Angat River and its Tributaries, (Baybay Section) Brgy. Baybay, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":43434599.76,"abc":44099622.06,"fy":"2022","sd":"03/07/2022","cd":"2022-09-16","lat":14.93861,"lon":121.04361,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":1.19,"wp":[14.93272,121.03439],"wst":"matched","br":"Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2512},{"i":3384,"cid":"22OC0036","pid":"P00620387LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Magsaysay St. and its Vicinity, Brgy. Guadalupe Nuevo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":24491201.47,"abc":24500000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-10-18","lat":14.561244,"lon":121.04374,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe Nuevo","len":null,"ph":null,"dup":[],"run":[3381,3126],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0034 to 22OC0038) cover the same site, together worth PHP 47,011,876.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":649},{"i":3385,"cid":"23OD0126","pid":"P00725544LZ","t":"Construction of Flood Control Structure along Banks of Creeks, Barangay 172, Caloocan City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":85195339.66,"abc":86845359.71,"fy":"2023","sd":"03/17/2023","cd":"2024-02-08","lat":14.75076,"lon":121.043923,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"172","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2513},{"i":3386,"cid":"22OD0153","pid":"P00640454LZ","t":"Construction of Flood Control Wall along the Various Creeks of Sitio, Matarik, Barangay 175, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":93081552.75,"abc":96477685.35,"fy":"2022","sd":"05/16/2022","cd":"2022-12-09","lat":14.76982,"lon":121.04407,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2514},{"i":3387,"cid":"24OB0258","pid":"P00820560LZ","t":"Bank Improvement of Slope Protection along Pasig-Marikina River, Pasig City (Package 1)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":47992147.31,"abc":48999580.75,"fy":"2024","sd":"04/01/2024","cd":"2024-12-26","lat":14.581363,"lon":121.044073,"sm":412,"fm":412,"tm":412,"am":402,"md":1.38,"ls":"adjacent","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2515},{"i":3388,"cid":"24OB0259","pid":"P00820561LZ","t":"Bank Improvement of Slope Protection along Pasig-Marikina River, Pasig City (Package 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":47992369.6,"abc":48999807.68,"fy":"2024","sd":"04/01/2024","cd":"2024-12-26","lat":14.581113,"lon":121.044137,"sm":412,"fm":412,"tm":412,"am":402,"md":1.37,"ls":"adjacent","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2516},{"i":3389,"cid":"22OD0099","pid":"P00620405LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 172, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":19187780.22,"abc":19598776.96,"fy":"2022","sd":"02/08/2022","cd":"2022-08-22","lat":14.742822,"lon":121.044253,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"172","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2517},{"i":3390,"cid":"23BJ0032","pid":"P00725663LZ","t":"Construction of Flood Control Structures at Comon-Latar Section, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / KEVIN PAUL CONSTRUCTION","c":96499461.23,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-15","lat":16.25805,"lon":121.04444,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2518},{"i":3391,"cid":"23BJ0053","pid":"P00727115LZ","t":"Construction of Flood Control Structures along Marang River (Section 1), Brgy. Comon, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":29123404.28,"abc":29125440.0,"fy":"2023","sd":"03/17/2023","cd":"2023-08-16","lat":16.25944,"lon":121.04472,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Marang","wn":"Marang River","wd":0.03,"wp":[16.25936,121.04497],"wst":"matched","br":"Comon","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2519},{"i":3392,"cid":"22DQ0024","pid":"P00632881LZ","t":"Construction of Drainage (Phase III), Barangay Milagrosa, Carmona, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":7919708.15,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.30486,"lon":121.04473,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Milagrosa","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2520},{"i":3393,"cid":"21OC0068","pid":"P00525776LZ","t":"Upgrading/Drainage Improvement of Severina Diamond Ave., Barangay Marcelo Green, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"CALCON ENGINEERING","c":18915960.0,"abc":19600000.0,"fy":"2021","sd":"03/31/2021","cd":"2022-09-26","lat":14.465412,"lon":121.045025,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marcelo Green","len":null,"ph":null,"dup":[],"run":[],"cl":[3125,3152,3172,3299,3891,3934,3983],"L":"field","s":16,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1126},{"i":3394,"cid":"24CD0195","pid":"P00839580LZ","t":"Construction of Drainage Structure, Barangay Poblacion, Norzagaray, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"1199S CONSTRUCTION","c":4865139.76,"abc":4939228.18,"fy":"2024","sd":"05/16/2024","cd":"2024-10-19","lat":14.905472,"lon":121.045084,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2521},{"i":3395,"cid":"21DQ0027","pid":"P00525625LZ","t":"Construction of Revetment and other Improvements along Carmona River, Brgy. Mabuhay, Phase I, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"Carmona","deo":"Cavite 3rd District Engineering Office","co":"DMLC BUILDERS","c":77199998.22,"abc":77199998.22,"fy":"2021","sd":"03/08/2021","cd":"2022-10-17","lat":14.30327,"lon":121.04527,"sm":343,"fm":null,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.06,"wp":[14.29533,121.05072],"wst":"matched","br":"Mabuhay","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2522},{"i":3396,"cid":"24DQ0067","pid":"P00845832LZ","t":"Construction of Revetment along Carmona River (Upstream), Brgy. Milagrosa, Carmona, Cavite (Phase 1)","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":69298609.16,"abc":69299989.4,"fy":"2024","sd":"05/15/2024","cd":"2025-03-10","lat":14.303515,"lon":121.04547,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.07,"wp":[14.29533,121.05072],"wst":"matched","br":"Milagrosa","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2523},{"i":3397,"cid":"23DQ0106","pid":"P00742429LZ","t":"Construction of Slope and Flood Protection Structure along Carmona River, Phase 2, Carmona, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"AARCON BUILDERS","c":89092693.05,"abc":89099975.39,"fy":"2023","sd":"06/06/2023","cd":"2024-05-27","lat":14.30355,"lon":121.04553,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.07,"wp":[14.29533,121.05072],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2524},{"i":3398,"cid":"22OI0016","pid":"P00620903LZ","t":"Construction (Completion) of Flood Control Structure, Bayanan River, Barangay Alabang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":42618812.95,"abc":44393323.66,"fy":"2022","sd":"04/07/2022","cd":"2022-09-03","lat":14.388016,"lon":121.045604,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Bayanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2525},{"i":3399,"cid":"21OI0117","pid":"P00561206LZ","t":"Construction of Drainage System along Montillano Street Extension and Vicinity, Brgy. Alabang, Muntinlupa City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"City of Muntinlupa","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"AARCON BUILDERS","c":9893831.88,"abc":9899186.02,"fy":"2021","sd":"01/07/2022","cd":"2023-03-05","lat":14.419132,"lon":121.045746,"sm":407,"fm":null,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2526},{"i":3400,"cid":"23CD0066","pid":"P00725716LZ","t":"Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96498963.65,"abc":96499620.51,"fy":"2023","sd":"03/01/2023","cd":"2023-12-05","lat":14.81692,"lon":121.04584,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2527},{"i":3401,"cid":"23OI0010","pid":"P00725918LZ","t":"Construction of Flood Control Structure, Alabang River, Barangay Alabang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION)","c":48989140.74,"abc":48999732.17,"fy":"2023","sd":"02/13/2023","cd":"2023-09-10","lat":14.42629,"lon":121.046125,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Alabang","wn":"Alabang Creek","wd":0.39,"wp":[14.42331,121.04427],"wst":"matched","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2528},{"i":3402,"cid":"21OG0093","pid":"P00561615LZ","t":"Improvement of Drainage and Ground Improvement,                                                  Brgy. Immaculate Conception, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 2nd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":7914730.27,"abc":7919908.35,"fy":"2021","sd":"11/10/2021","cd":"2022-07-07","lat":14.6201,"lon":121.0462,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Immaculate Conception","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2529},{"i":3403,"cid":"22DI0066","pid":"P00620223LZ","t":"Construction of Revetment along Biñan River, Brgy. Timbao, Biñan City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":96498600.2,"abc":96500000.0,"fy":"2022","sd":"03/09/2022","cd":"2022-12-05","lat":14.28144,"lon":121.04633,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Biñan","wn":"Biñan River","wd":6.15,"wp":[14.32787,121.07768],"wst":"matched","br":"Timbao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.61,"value":6.15,"text":"The title names Biñan, which OpenStreetMap maps through the stated municipality, but the pin is 6.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":257},{"i":3404,"cid":"22OF0060","pid":"P00631042LZ","t":"Construction of Flood Control Structure, Brgy. Pasong Tamo, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"PILASTRO BUILDERS & DEVELOPMENT INC.","c":14259000.0,"abc":14700000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-20","lat":14.665318,"lon":121.046344,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasong Tamo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2530},{"i":3405,"cid":"23BJ0002","pid":"P00725666LZ","t":"Construction of Flood Control Structures at Comon Section, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48239429.45,"abc":48250000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-27","lat":16.25527,"lon":121.04638,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2531},{"i":3406,"cid":"23DI0144","pid":"P00737524LZ","t":"Construction of Slope Protection along Sto. Domingo River, Barangay Sto. Domingo, Santa Rosa City, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"LE BRON CONSTRUCTION","c":9899592.24,"abc":9900000.0,"fy":"2023","sd":"08/09/2023","cd":"2023-09-22","lat":14.228413,"lon":121.046579,"sm":419,"fm":419,"tm":419,"am":1455,"md":0.0,"ls":"inside","ww":"Sto. Domingo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2532},{"i":3407,"cid":"23OF0031","pid":"P00736171LZ","t":"Rehabilitation of Flood Control Structure (Phase 2), Barangay Sta. Monica, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"FRAMECON BUILDERS","c":48996288.55,"abc":48999625.86,"fy":"2023","sd":"02/14/2023","cd":"2023-11-24","lat":14.722993,"lon":121.04672,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Monica","len":null,"ph":"Phase 2","dup":[3408],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,496,179.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":916},{"i":3408,"cid":"23OF0122","pid":"P00742248LZ","t":"Rehabilitation of Flood Control Structure of Villa Verde Creek, Barangay Sta. Monica, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":49499890.92,"abc":49499920.6,"fy":"2023","sd":"04/05/2023","cd":"2023-12-18","lat":14.722993,"lon":121.04672,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Villa Verde","wn":"Villa Verde Creek","wd":0.0,"wp":[14.72301,121.04669],"wst":"matched","br":"Sta. Monica","len":null,"ph":null,"dup":[3407],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,496,179.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":876},{"i":3409,"cid":"22CD0209","pid":"P00637027LZ","t":"Construction of Flood Control Structure, Panaklayan, Barangay Graceville to Barangay Gaya-gaya, City of San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96496179.81,"abc":96499616.33,"fy":"2022","sd":"03/30/2022","cd":"2023-03-08","lat":14.78669,"lon":121.047,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Graceville","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2533},{"i":3410,"cid":"22OC0037","pid":"P00620388LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Negros St., Mindoro St., and its Vicinity, Brgy. Pitogo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-07-08","lat":14.555969,"lon":121.047081,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pitogo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2534},{"i":3411,"cid":"22OI0048","pid":"P00632701LZ","t":"Construction of Drainage System, Barangay Putatan, Muntinlupa City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"RFSM CONSTRUCTION CORPORATION","c":14698980.22,"abc":14699980.22,"fy":"2022","sd":"03/04/2022","cd":"2022-12-18","lat":14.399001,"lon":121.047139,"sm":407,"fm":395,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.63,"text":"The record contradicts itself: the title and the pin point to City of Muntinlupa, NCR, Fourth District, but the municipality field names City of Las Piñas, NCR, Fourth District, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":605},{"i":3412,"cid":"22OI0150","pid":"P00637755LZ","t":"Construction of Drainage System along NIA Road & Vicinity, Barangay Putatan, Muntinlupa City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"KPSL GENERAL CONTRACTOR INC.","c":18120439.12,"abc":18129068.7,"fy":"2022","sd":"07/08/2022","cd":"2023-05-03","lat":14.39893,"lon":121.047525,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2535},{"i":3413,"cid":"21PC0018","pid":"P00526268LZ","t":"Construction of Poblacion Flood Control Structure along Apayao River, Sta. 136 + 247.68 - Sta. 136 + 752.68 (L/S), Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Calanasan","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":92692943.8,"abc":96500000.0,"fy":"2021","sd":"03/18/2021","cd":"2022-10-03","lat":18.25091,"lon":121.04757,"sm":294,"fm":null,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":0.23,"wp":[18.25149,121.04964],"wst":"matched","br":null,"len":505.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2536},{"i":3414,"cid":"23OI0020","pid":"P00725550LZ","t":"Construction of Flood Control Structure, Tuklas River, Barangay Cupang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) / PILASTRO BUILDERS & DEVELOPMENT INC.","c":81889353.83,"abc":82024778.8,"fy":"2023","sd":"02/13/2023","cd":"2023-11-09","lat":14.427167,"lon":121.047597,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Tuklas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cupang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2537},{"i":3415,"cid":"23OF0026","pid":"P00736172LZ","t":"Rehabilitation of Flood Control Structure (Phase 2), Barangay Sta. Lucia, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":29399256.06,"abc":29399752.98,"fy":"2023","sd":"02/14/2023","cd":"2023-11-24","lat":14.70269,"lon":121.047957,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2538},{"i":3416,"cid":"24CD0016","pid":"P00821582LZ","t":"Construction of Flood Control Structure along Angat River, Brgy. Pinagtulayan, Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"SYMS CONSTRUCTION TRADING","c":48249967.43,"abc":48249920.64,"fy":"2024","sd":"04/08/2024","cd":"2024-11-04","lat":14.921073,"lon":121.048045,"sm":1025,"fm":1025,"tm":1025,"am":60,"md":0.08,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.92077,121.04778],"wst":"matched","br":"Pinagtulayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2539},{"i":3417,"cid":"22OF0143","pid":"P00631039LZ","t":"Construction of Flood Control Structure at Maceda Bridge, Brgy. Talipapa, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"NUEDA BUILDERS CONSTRUCTION & SUPPLY INC.","c":19006235.0,"abc":19600000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-10-05","lat":14.674986,"lon":121.048194,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talipapa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2540},{"i":3418,"cid":"22OD0041","pid":"P00620397LZ","t":"Construction of Flood Control Wall along the Banks of Creek, Brgy. 175, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":43668317.29,"abc":45065477.4,"fy":"2022","sd":"02/08/2022","cd":"2022-08-22","lat":14.767321,"lon":121.048287,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2541},{"i":3419,"cid":"23CD0064","pid":"P00725719LZ","t":"Construction of Flood Control Structure along NCR/ Bulacan Bdry.-Bigte-Ipo Dam Road Ilog Bayan River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96497614.18,"abc":96499224.52,"fy":"2023","sd":"03/01/2023","cd":"2023-12-05","lat":14.815157,"lon":121.048346,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2542},{"i":3420,"cid":"23CD0118","pid":"P00725723LZ","t":"Construction of Flood Control Structure, Barangay Minuyan Proper, City of San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":96493479.41,"abc":96499786.46,"fy":"2023","sd":"04/24/2023","cd":"2024-02-23","lat":14.8434,"lon":121.048346,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Minuyan Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2543},{"i":3421,"cid":"23OF0056","pid":"P00726019LZ","t":"Construction of Flood Control Structure along Pasong Tamo Creek, Barangay Pasong Tamo, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":48998190.05,"abc":48999999.5,"fy":"2023","sd":"02/27/2023","cd":"2023-10-18","lat":14.679132,"lon":121.048362,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Pasong Tamo","wn":"Pasong Tamo Creek","wd":0.0,"wp":[14.67912,121.04838],"wst":"matched","br":"Pasong Tamo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2544},{"i":3422,"cid":"24OD0040","pid":"P00820602LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Barangay 174, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28873493.58,"abc":29399212.6,"fy":"2024","sd":"02/14/2024","cd":"2024-05-27","lat":14.76465,"lon":121.048698,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"174","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2545},{"i":3423,"cid":"24CD0055","pid":"P00820230LZ","t":"Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96495776.49,"abc":96499521.49,"fy":"2024","sd":"02/22/2024","cd":"2024-11-18","lat":14.814932,"lon":121.048706,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2546},{"i":3424,"cid":"24OF0063","pid":"P00824615LZ","t":"Construction of Drainage Systems at Brgy. Baesa, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.I. VILLACORTE CONSTRUCTION","c":11759532.63,"abc":11759980.38,"fy":"2024","sd":"02/23/2024","cd":"2024-06-17","lat":14.67191,"lon":121.00738,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2547},{"i":3425,"cid":"23OA0044","pid":"P00726992LZ","t":"Construction of Babanse 1 Pumping Station, Brgy. NBBS Kaunlaran, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":23274381.97,"abc":23271437.1,"fy":"2023","sd":"03/08/2023","cd":"2023-12-27","lat":14.646014,"lon":120.957806,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"NBBS Kaunlaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2548},{"i":3426,"cid":"24CD0115","pid":"P00823483LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Poblacion (Calumpang Section - Left Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":43424968.82,"abc":43424461.05,"fy":"2024","sd":"03/11/2024","cd":"2024-09-29","lat":14.90898,"lon":121.050345,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90895,121.0507],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2549},{"i":3427,"cid":"21DI0066","pid":"P00561773LZ","t":"Construction of Revetment/Riverwall along Tunasan River, (near Narra Road), Brgy. San Antonio, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"City of San Pedro","deo":"Laguna 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":39456327.49,"abc":39600000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-08-09","lat":14.352914,"lon":121.019286,"sm":418,"fm":null,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"Tunasan","wn":"Tunasan River","wd":0.0,"wp":[14.35294,121.01927],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2550},{"i":3428,"cid":"22OI0040","pid":"P00620914LZ","t":"Construction of Retaining Wall, Buli Creek, Barangay Buli, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":9794372.22,"abc":9799483.95,"fy":"2022","sd":"02/09/2022","cd":"2023-07-07","lat":14.445445,"lon":121.050393,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli River","wd":0.0,"wp":[14.44544,121.05039],"wst":"matched","br":"Buli","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2551},{"i":3429,"cid":"21DQ0065","pid":"P00561596LZ","t":"Construction of Revetment and Other Improvements, Zapote River, Brgy. Molino VII, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"Bacoor City","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98990072.01,"abc":98999990.91,"fy":"2021","sd":"10/11/2021","cd":"2022-07-22","lat":14.40521,"lon":120.99584,"sm":98,"fm":null,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.0,"wp":[14.40524,120.99585],"wst":"matched","br":"Molino VII","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2552},{"i":3430,"cid":"24OC0107","pid":"P00844676LZ","t":"Construction of Revetment at Villanueva Creek Tributary Near Manila Memorial Park, District 2, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29365844.46,"abc":29400000.0,"fy":"2024","sd":"05/09/2024","cd":"2024-08-16","lat":14.452595,"lon":121.02515,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.93,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2553},{"i":3431,"cid":"22OI0124","pid":"P00631008LZ","t":"Rehabilitation of Road and Drainage System, Brgy. Talon 3, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"MRJR CONSTRUCTION & TRADING","c":9309688.71,"abc":9799999.59,"fy":"2022","sd":"05/27/2022","cd":"2022-09-23","lat":14.436589,"lon":121.007521,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talon 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2554},{"i":3432,"cid":"22OG0097","pid":"P00620449LZ","t":"Rehabilitation of San Juan River, Phase I, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS","c":43077774.26,"abc":43119992.18,"fy":"2022","sd":"03/23/2022","cd":"2022-11-21","lat":14.61849,"lon":121.019305,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61868,121.01947],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[3443,3457,3497],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OG0097 to 22OG0100) cover the same site, together worth PHP 172,158,541.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":585},{"i":3433,"cid":"24CD0034","pid":"P00838343LZ","t":"Construction of Flood Control Structure along Santa Maria River and Its Tributaries, Sta. 16+252-Sta. 16+552 (San Jose Patag - Pulong Buhangin Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96499990.88,"abc":97999943.54,"fy":"2024","sd":"02/22/2024","cd":"2024-12-12","lat":14.875938,"lon":120.99585,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Santa Maria","wn":"Santa Maria River","wd":5.67,"wp":[14.82471,120.99382],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.67,"text":"The title names Santa Maria, which OpenStreetMap maps through the stated municipality, but the pin is 5.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":258},{"i":3434,"cid":"21DE0084","pid":"P00561749LZ","t":"Construction of Flood Control Structure, Brgy. Banaba West, Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"Batangas City","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION","c":2970000.0,"abc":2970000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-07-20","lat":13.794522,"lon":121.050403,"sm":180,"fm":null,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banaba West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2555},{"i":3435,"cid":"23OE0085","pid":"P00727027LZ","t":"Construction of Box Culvert along Salamisim St., Bacood, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":48999399.5,"abc":48999801.63,"fy":"2023","sd":"03/01/2023","cd":"2024-02-25","lat":14.590783,"lon":121.019328,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":62},{"i":3436,"cid":"23OE0100","pid":"P00737402LZ","t":"Rehabilitation of Drainage, Barangay 152, Zone 14, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DENNREY CONSTRUCTION AND TRADING COMPANY","c":4947371.32,"abc":4948173.3,"fy":"2023","sd":"03/08/2023","cd":"2023-06-20","lat":14.622964,"lon":120.972442,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"152","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":63},{"i":3437,"cid":"23CD0021","pid":"P00726726LZ","t":"Construction of Flood Control Structure along Meycauayan River and its Tributaries (Bayugo - Bangkal Section) Sta. 00+000 - Sta. 00+200, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":48997172.39,"abc":48998969.45,"fy":"2023","sd":"02/22/2023","cd":"2023-07-11","lat":14.72193,"lon":120.957877,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":1.02,"wp":[14.73075,120.9606],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[3120,2655,2736,3793],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23CD0021 to 23CD0025) cover the same site, together worth PHP 264,356,660.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":522},{"i":3438,"cid":"23P00032","pid":"P00727096LZ","t":"Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 440 (Manaan Section), Tinoc, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"TINOC (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION / BEGAL DESIGN & CONSTRUCTION","c":32009050.0,"abc":32505326.94,"fy":"2023","sd":"07/03/2023","cd":"2024-01-19","lat":16.63542,"lon":120.97251,"sm":1571,"fm":1571,"tm":1571,"am":1571,"md":0.0,"ls":"inside","ww":"Tinoc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":480.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2556},{"i":3439,"cid":"24CD0059","pid":"P00820202LZ","t":"Construction of Flood Control Structure along Ilog Bayan River (Bigte-Ipo Dam Road), San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96495673.58,"abc":96499453.25,"fy":"2024","sd":"02/22/2024","cd":"2024-11-18","lat":14.809995,"lon":121.050434,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2557},{"i":3440,"cid":"24BI0019","pid":"P00820790LZ","t":"Rehabilitation of Flood Control Structure along Santa Cruz River, Barangay Salinas, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-10-03","lat":16.3695,"lon":121.0252,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Santa Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salinas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2558},{"i":3441,"cid":"24OH0040","pid":"P00820018LZ","t":"Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 322 to Sta 0 + 483), Phase 5","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":89071419.94,"abc":89171966.73,"fy":"2024","sd":"02/21/2024","cd":"2024-10-22","lat":14.546802,"lon":120.99594,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":161.0,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2559},{"i":3442,"cid":"23CE0008","pid":"P00726169LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Caridad Sur, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":48016684.03,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-04-15","lat":15.734257,"lon":121.007698,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.09,"wp":[15.73405,121.00692],"wst":"matched","br":"Caridad Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2560},{"i":3443,"cid":"22OG0098","pid":"P00620450LZ","t":"Rehabilitation of San Juan River, Phase II, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MARCBILT CONSTRUCTION, INC.","c":43119548.85,"abc":43119555.59,"fy":"2022","sd":"03/23/2022","cd":"2022-11-10","lat":14.618373,"lon":121.019381,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61847,121.01961],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[3451],"run":[3432,3457,3497],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 66,300,185.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OG0097 to 22OG0100) cover the same site, together worth PHP 172,158,541.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":128},{"i":3444,"cid":"23D00161","pid":"P00742174LZ","t":"Construction of Flood Control Structures, Road and Other Improvements, Zapote River, Brgy. Molino 4, Bacoor, Cavite (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":59390310.24,"abc":59400000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-02-14","lat":14.3828,"lon":121.00792,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.06,"wp":[14.38328,121.00819],"wst":"matched","br":"Molino 4","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2561},{"i":3445,"cid":"23OF0055","pid":"P00742247LZ","t":"Construction of Flood Control Structure and Tributaries along Pasong Tamo Creek, Sta. 0+000 to Sta. 0+805 (Left Side), Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"REND ENTERPRISES & GENERAL CONTRACTOR","c":9701998.78,"abc":9899998.75,"fy":"2023","sd":"03/21/2023","cd":"2023-07-21","lat":14.67366,"lon":121.05052,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Pasong Tamo","wn":"Pasong Tamo Creek","wd":0.0,"wp":[14.67365,121.05049],"wst":"matched","br":null,"len":805.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2562},{"i":3446,"cid":"24OC0104","pid":"P00844677LZ","t":"Construction of Revetment at Villanueva Creek, Barangay BF Homes, District 2, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29399812.65,"abc":29400000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-08-19","lat":14.45258,"lon":121.02523,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.93,"wp":[14.46825,121.01732],"wst":"matched","br":"BF Homes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2563},{"i":3447,"cid":"22DQ0068","pid":"P00640460LZ","t":"Construction of Revetment along Maliksi River (tributary to Manila Bay), Phase 1, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98999347.53,"abc":98999990.55,"fy":"2022","sd":"04/07/2022","cd":"2023-12-07","lat":14.46512,"lon":120.95815,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Maliksi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2564},{"i":3448,"cid":"23BJ0042","pid":"P00740575LZ","t":"Construction of Flood Control Structure along Santa Fe River, Barangay Cutar, Aritao, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BIG G BUILDERS","c":24269077.07,"abc":24271200.0,"fy":"2023","sd":"03/23/2023","cd":"2023-09-09","lat":16.28083,"lon":121.02527,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Santa Fe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cutar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2565},{"i":3449,"cid":"23DI0096","pid":"P00742438LZ","t":"Construction of Drainage, Barangay Narra, City of San Pedro, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JA.VI CONSTRUCTION","c":4944333.6,"abc":4950000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-08-02","lat":14.3311,"lon":121.0253,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Narra","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2566},{"i":3450,"cid":"22OE0090","pid":"P00620419LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de Kabulusan, Barangay 154 and Barangay 157, Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) / DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":48978202.54,"abc":48999790.29,"fy":"2022","sd":"02/28/2022","cd":"2022-09-25","lat":14.618699,"lon":120.972531,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Kabulusan","wn":"Estero de Kabulusan","wd":0.01,"wp":[14.61862,120.97251],"wst":"matched","br":"154","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":64},{"i":3451,"cid":"22OG0111","pid":"P00637004LZ","t":"Rehabilitation of San Juan River (Phase X), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"R2CG BUILDERS INC. (FORMERLY: RRCG 8639 BUILDERS INC.)","c":23180635.76,"abc":24124338.0,"fy":"2022","sd":"05/18/2022","cd":"2023-02-11","lat":14.618373,"lon":121.019381,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61847,121.01961],"wst":"matched","br":null,"len":null,"ph":"Phase X","dup":[3443],"run":[3641,3689,3462,3505],"cl":[],"L":"field","s":43,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 66,300,185.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0107 to 22OG0111) cover the same site, together worth PHP 136,621,674.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":165},{"i":3452,"cid":"23OA0058","pid":"P00742226LZ","t":"Construction of Drainage System & Upgrading of Road, Longos, Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":29699974.49,"abc":29696346.9,"fy":"2023","sd":"03/27/2023","cd":"2023-12-13","lat":14.655875,"lon":120.958151,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2567},{"i":3453,"cid":"21BI0046","pid":"P00561525LZ","t":"Rehabilitation/Improvement of Flood Control and Drainage Structure along Sta. Cruz River, Salinas Section 1, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"SHANLEY CONSTRUCTION / ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-12-20","lat":16.36959,"lon":121.02549,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.19,"wp":[16.3686,121.02689],"wst":"matched","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2568},{"i":3454,"cid":"23OD0129","pid":"P00725978LZ","t":"Construction of Flood Control Structure along the Banks of Creeks, along Captain Rico Barangay 174, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28901500.48,"abc":29398817.05,"fy":"2023","sd":"03/17/2023","cd":"2024-01-09","lat":14.766236,"lon":121.05053,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"174","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2569},{"i":3455,"cid":"24OD0005","pid":"P00820582LZ","t":"Construction of Drainage (Box Culvert) along F. Francisco NLEX Service Road, Barangay Gen. T. De Leon, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"GILTOP CIVIL ENGINEERING CONSTRUCTION","c":9453521.74,"abc":9786277.08,"fy":"2024","sd":"02/14/2024","cd":"2024-08-19","lat":14.68915,"lon":120.99598,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gen. T. De Leon","len":null,"ph":null,"dup":[],"run":[3011,3151],"cl":[],"L":"field","s":29,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OD0003 to 24OD0006) cover the same site, together worth PHP 28,354,810.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":682},{"i":3456,"cid":"23OH0017","pid":"P00742249LZ","t":"Rehabilitation of Estero Tripa De Gallina (From EDSA to Protacio), Pasay City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"CAANA CONSTRUCTION CORPORATION","c":5791218.01,"abc":5939840.7,"fy":"2023","sd":"04/11/2023","cd":"2023-06-14","lat":14.538556,"lon":121.007928,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Tripa De Gallina","wn":"Estero de Tripa de Gallina","wd":0.0,"wp":[14.53856,121.0079],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2570},{"i":3457,"cid":"22OG0099","pid":"P00620451LZ","t":"Rehabilitation of San Juan River, Phase III, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"WAWAO BUILDERS","c":43100448.71,"abc":43119378.09,"fy":"2022","sd":"03/23/2022","cd":"2022-11-24","lat":14.618053,"lon":121.019617,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.61812,121.01977],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[3462],"run":[3432,3443,3497],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 70,910,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OG0097 to 22OG0100) cover the same site, together worth PHP 172,158,541.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":129},{"i":3458,"cid":"22DQ0077","pid":"P00639490LZ","t":"Construction of Drainage, Barangay Biluso, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TCSC CORP.","c":4899933.27,"abc":19599797.32,"fy":"2022","sd":"04/11/2022","cd":"2022-10-17","lat":14.23999,"lon":120.95817,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biluso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2571},{"i":3459,"cid":"24OE0008","pid":"P00820090LZ","t":"Installation of Booster Pump at Estero dela Reina (Package 1a), Binondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":144723988.9,"abc":144749815.2,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.602906,"lon":120.97274,"sm":211,"fm":null,"tm":211,"am":211,"md":0.0,"ls":"inside","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60291,120.97275],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3470],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 288,790,579.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":683},{"i":3460,"cid":"23OC0090","pid":"P00726826LZ","t":"Construction of Flood Mitigation Structure along Villanueva Creek (Back of Westmont Condominium), Barangay San Isidro, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"PRECIOUS CONSTRUCTION / KIMCON CONSTRUCTION AND SUPPLY","c":96499846.05,"abc":96500000.0,"fy":"2023","sd":"04/27/2023","cd":"2024-02-20","lat":14.469538,"lon":121.008038,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.35,"wp":[14.47237,121.0095],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3199,3475,3631,3748,3825,3908,3914],"L":"field","s":26,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":839},{"i":3461,"cid":"24OH0074","pid":"P00843177LZ","t":"Rehabilitation of Villamor Air Base Drainage System (Phase 4), Pasay City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"FS CO BUILDERS AND SUPPLY","c":96393504.48,"abc":96499998.21,"fy":"2024","sd":"05/06/2024","cd":"2024-12-02","lat":14.521345,"lon":121.025556,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2572},{"i":3462,"cid":"22OG0109","pid":"P00637002LZ","t":"Rehabilitation of San Juan River (Phase VIII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"R2CG BUILDERS INC. (FORMERLY: RRCG 8639 BUILDERS INC.)","c":27810536.88,"abc":28949502.01,"fy":"2022","sd":"05/18/2022","cd":"2023-02-11","lat":14.618053,"lon":121.019617,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.61812,121.01977],"wst":"matched","br":null,"len":null,"ph":"Phase VIII","dup":[3457],"run":[3641,3689,3505,3451],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 70,910,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0107 to 22OG0111) cover the same site, together worth PHP 136,621,674.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":151},{"i":3463,"cid":"24CD0114","pid":"P00823482LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Poblacion (Calumpang Section - Right Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":42525565.0,"abc":42525304.62,"fy":"2024","sd":"03/11/2024","cd":"2024-09-28","lat":14.910521,"lon":121.050572,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.91051,121.05093],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2573},{"i":3464,"cid":"22OI0015","pid":"P00620057LZ","t":"Construction of Slope Protection at Pasong Baka Creek, Brgy. Talon 5, Las Piñas City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":67449782.47,"abc":67549782.47,"fy":"2022","sd":"02/17/2022","cd":"2022-09-14","lat":14.417619,"lon":120.996494,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Pasong Baka","wn":"Pasong Baka Creek","wd":0.0,"wp":[14.41761,120.99649],"wst":"matched","br":"Talon 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2574},{"i":3465,"cid":"24DI0020","pid":"P00820896LZ","t":"Construction of Riverbank Protection Structure at Barangay San Antonio and Barangay San Vicente, San Pedro City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"D.T. RECIO INCORPORATED","c":28719279.7,"abc":29400000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-09-06","lat":14.361519,"lon":121.050636,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2575},{"i":3466,"cid":"24OH0087","pid":"P00843173LZ","t":"Improvement of Villamor Golf Course Drainage System (Phase 1), Pasay City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / FS CO BUILDERS AND SUPPLY","c":96395644.88,"abc":96499999.79,"fy":"2024","sd":"05/06/2024","cd":"2024-11-19","lat":14.529059,"lon":121.019756,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2576},{"i":3467,"cid":"24CE0158","pid":"P00823450LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Caridad Norte, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION)","c":47767474.68,"abc":48250000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-09-16","lat":15.745072,"lon":121.008236,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.16,"wp":[15.74651,121.00814],"wst":"matched","br":"Caridad Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2577},{"i":3468,"cid":"24OD0032","pid":"P00820600LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Barangay 167, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28753954.6,"abc":29399160.51,"fy":"2024","sd":"02/14/2024","cd":"2024-06-24","lat":14.729974,"lon":121.025578,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"167","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2578},{"i":3469,"cid":"23OA0045","pid":"P00726993LZ","t":"Construction of Kanduli Pumping Station, Brgy. NBBS Kaunlaran, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"721 BUILDERS CORPORATION","c":23272181.36,"abc":23268117.35,"fy":"2023","sd":"03/08/2023","cd":"2023-11-02","lat":14.646395,"lon":120.958234,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"NBBS Kaunlaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2579},{"i":3470,"cid":"24OE0041","pid":"P00823248LZ","t":"Installation of Booster Pump at Estero dela Reina (Package 1b), Binondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":144066590.1,"abc":144749982.3,"fy":"2024","sd":"02/13/2024","cd":"2024-06-07","lat":14.602906,"lon":120.97274,"sm":211,"fm":null,"tm":211,"am":211,"md":0.0,"ls":"inside","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60291,120.97275],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3459],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 288,790,579.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":684},{"i":3471,"cid":"24CF0079","pid":"P00843300LZ","t":"Construction of Flood Mitigation Structure including Drainage System along Baca River, Barangay Mayapyap, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":75650574.13,"abc":77199905.27,"fy":"2024","sd":"03/25/2024","cd":"2024-09-20","lat":15.52194,"lon":120.95827,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":"Baca","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mayapyap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2580},{"i":3472,"cid":"23DE0007","pid":"P00726200LZ","t":"Rehabilitation of Flood Control Structure at Barangay Bolbok, Batangas City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TRISTAN TEJADA CONSTRUCTION (FORMERLY: JOMATRIS CO","c":41795040.0,"abc":41795040.0,"fy":"2023","sd":"02/10/2023","cd":"2023-09-16","lat":13.773691,"lon":121.050639,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bolbok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2581},{"i":3473,"cid":"22PI0066","pid":"P00621007LZ","t":"Construction of Bonon Flood Control Structure, Sta. 31+ 380 - Sta.31+460 (LS) along Talubin River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"DHEN'Z CONSTRUCTION","c":15680000.0,"abc":15679999.6,"fy":"2022","sd":"03/07/2022","cd":"2022-11-18","lat":17.04699,"lon":121.00843,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Talubin","wn":"Talubin River","wd":0.02,"wp":[17.0469,121.00863],"wst":"matched","br":null,"len":80.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2582},{"i":3474,"cid":"24OH0085","pid":"P00843178LZ","t":"Rehabilitation of Villamor Air Base Drainage System (Phase 5), Pasay City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / FS CO BUILDERS AND SUPPLY","c":96399674.94,"abc":96499998.29,"fy":"2024","sd":"05/06/2024","cd":"2025-01-30","lat":14.520992,"lon":121.02617,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2583},{"i":3475,"cid":"24OC0041","pid":"P00820576LZ","t":"Rehabilitation of Drainage System at Lopez Village, Barangay San Isidro, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":19599817.96,"abc":19600000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-21","lat":14.468584,"lon":121.008498,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3199,3460,3631,3748,3825,3908,3914],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1077},{"i":3476,"cid":"22CD0160","pid":"P00639342LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 14+200 - Sta. 14+800, Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96497418.82,"abc":96499526.39,"fy":"2022","sd":"03/30/2022","cd":"2023-04-18","lat":15.22809,"lon":120.99651,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.02,"wp":[15.22812,120.99665],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,3047,2323,3520,3061,3096],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":280},{"i":3477,"cid":"22OD0195","pid":"P00637044LZ","t":"Construction of Flood Control wall along Rincon Creek, Brgy. Rincon, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":8553377.26,"abc":8817924.43,"fy":"2022","sd":"03/24/2022","cd":"2022-11-16","lat":14.693461,"lon":120.958543,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Rincon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rincon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2584},{"i":3478,"cid":"25OE0029","pid":"P00920010LZ","t":"Installation of Booster Pump and Accessories along Estero dela Reina, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / 4 J'S CONSTRUCTION SERVICES","c":94714433.36,"abc":96499677.39,"fy":"2025","sd":"02/11/2025","cd":"2025-05-21","lat":14.60288,"lon":120.97274,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60289,120.97276],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":65},{"i":3479,"cid":"21CD0066","pid":"P00525608LZ","t":"Rehabilitation/ Improvement of Flood Control Structures along Bulo River, Lambakin Section Brgy. Lambakin, San Miguel, Bulacan Phase II","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"San Miguel","deo":"Bulacan 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":64847873.01,"abc":67549918.2,"fy":"2021","sd":"03/24/2021","cd":"2022-08-31","lat":15.239706,"lon":121.019792,"sm":1330,"fm":null,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":1.39,"wp":[15.23342,121.00859],"wst":"matched","br":"Lambakin","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2585},{"i":3480,"cid":"22OC0031","pid":"P00620382LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Chico St., Bayabas St., Kalamansi St., and its Vicinity, Brgy. Cembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":9728174.56,"abc":9800000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-08-22","lat":14.56611,"lon":121.050724,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2586},{"i":3481,"cid":"24OC0108","pid":"P00844678LZ","t":"Rehabilitation along Sapang Buwaya Creek, Greenheights Village, Barangay San Antonio, District II, Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":14673478.92,"abc":14700000.0,"fy":"2024","sd":"09/18/2024","cd":"2024-12-16","lat":14.47214,"lon":121.019805,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":1.13,"wp":[14.46644,121.0111],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2587},{"i":3482,"cid":"24OG0022","pid":"P00839536LZ","t":"Rehabilitation of Drainage System, Barangay Mariana, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC","c":29510680.05,"abc":29690699.47,"fy":"2024","sd":"02/08/2024","cd":"2024-12-13","lat":14.621177,"lon":121.026257,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mariana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2588},{"i":3483,"cid":"23CD0084","pid":"P00742330LZ","t":"Construction of Flood Control Structure (Slope Protection), Brgy. Sta. Rosa I, Marilao, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FORTUNE RDC ENTERPRISES","c":4875561.14,"abc":4949959.02,"fy":"2023","sd":"03/30/2023","cd":"2023-06-10","lat":14.772022,"lon":120.972785,"sm":941,"fm":941,"tm":941,"am":941,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Rosa I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2589},{"i":3484,"cid":"24OH0041","pid":"P00820019LZ","t":"Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 483 to Sta 0 + 644), Phase 6","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":89057544.2,"abc":89172016.01,"fy":"2024","sd":"02/21/2024","cd":"2024-11-11","lat":14.54715,"lon":120.996894,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":161.0,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2590},{"i":3485,"cid":"22OF0056","pid":"P00631052LZ","t":"Rehabilitation of Flood Control Structure, Barangay West Fairview, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":19012000.0,"abc":19600000.0,"fy":"2022","sd":"02/14/2022","cd":"2023-06-12","lat":14.721813,"lon":121.05088,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"West Fairview","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2591},{"i":3486,"cid":"22CE0096","pid":"P00620533LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Sta. Barbara, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) / ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION)","c":48996854.09,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-26","lat":15.715708,"lon":121.008529,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.06,"wp":[15.71584,121.00905],"wst":"matched","br":"Sta. Barbara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2592},{"i":3487,"cid":"24OG0024","pid":"P00839535LZ","t":"Rehabilitation of Drainage System, Barangay Laging Handa, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":29698539.56,"abc":29699458.46,"fy":"2024","sd":"02/08/2024","cd":"2024-09-23","lat":14.633525,"lon":121.026257,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Laging Handa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2593},{"i":3488,"cid":"24CF0031","pid":"P00825240LZ","t":"Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan (Right Bank), Peñaranda, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PEÑARANDA (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING","c":20168228.34,"abc":20579903.08,"fy":"2024","sd":"02/16/2024","cd":"2024-04-23","lat":15.338414,"lon":121.019806,"sm":1119,"fm":1119,"tm":1119,"am":1119,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.1,"wp":[15.33774,121.02047],"wst":"matched","br":"Sinasajan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2594},{"i":3489,"cid":"23OD0168","pid":"P00725979LZ","t":"Construction of Flood Control Structure along the Banks of Creeks, along Carnacion Barangay 174, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28944405.78,"abc":29398388.94,"fy":"2023","sd":"04/28/2023","cd":"2024-01-22","lat":14.766672,"lon":121.051002,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"174","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2595},{"i":3490,"cid":"22CE0057","pid":"P00620529LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Gomez, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES / SYMMETRICON BUILDERS CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-09-15","lat":15.686307,"lon":120.996931,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.06,"wp":[15.68674,120.99661],"wst":"matched","br":"Gomez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2596},{"i":3491,"cid":"22CD0010","pid":"P00620520LZ","t":"Construction of additional Pumping Station at Barangay Calvario, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":19132032.52,"abc":19313572.84,"fy":"2022","sd":"02/28/2022","cd":"2022-10-03","lat":14.73525,"lon":120.95874,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calvario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2597},{"i":3492,"cid":"23OD0140","pid":"P00725542LZ","t":"Construction of Flood Control Structure along the Banks of Creeks along Kabatuhan Rd., Barangay 168, Caloocan City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":85034813.77,"abc":86845428.47,"fy":"2023","sd":"04/24/2023","cd":"2023-12-13","lat":14.740888,"lon":121.008605,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"168","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2598},{"i":3493,"cid":"24OA0012","pid":"P00820538LZ","t":"Construction of Drainage System along Northbay Boulevard, Navotas City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"721 BUILDERS CORPORATION","c":4899439.91,"abc":4898427.16,"fy":"2024","sd":"02/12/2024","cd":"2024-05-30","lat":14.638244,"lon":120.958855,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2599},{"i":3494,"cid":"24OE0042","pid":"P00823238LZ","t":"Installation of Booster Pump at Estero de Binondo (Package 1a), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":144747913.7,"abc":144749926.7,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.60063,"lon":120.972799,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.60065,120.97283],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3510,3518],"run":[3510,3518],"cl":[],"L":"field","s":63,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 434,028,046.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OE0042 to 24OE0044) cover the same site, together worth PHP 434,028,046.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":12},{"i":3495,"cid":"23OI0019","pid":"P00725549LZ","t":"Construction of Flood Control Structure, Pasong Baka Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":82498128.05,"abc":86849876.37,"fy":"2023","sd":"02/13/2023","cd":"2023-06-28","lat":14.417282,"lon":120.996934,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Pasong Baka","wn":"Pasong Baka Creek","wd":0.01,"wp":[14.41727,120.99688],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2600},{"i":3496,"cid":"21OD0186","pid":"P00525781LZ","t":"Construction of Drainage Systems along Barangay 169, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":4821755.94,"abc":4903928.64,"fy":"2021","sd":"03/24/2022","cd":"2022-07-01","lat":14.731857,"lon":121.026456,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"169","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2601},{"i":3497,"cid":"22OG0100","pid":"P00620452LZ","t":"Rehabilitation of San Juan River, Phase IV, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":42860768.69,"abc":43119831.69,"fy":"2022","sd":"03/23/2022","cd":"2023-07-23","lat":14.67439,"lon":121.019873,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":4.67,"wp":[14.63249,121.01508],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[3505,3519],"run":[3432,3443,3457],"cl":[],"L":"records","s":62,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.67,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 4.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 147,943,554.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OG0097 to 22OG0100) cover the same site, together worth PHP 172,158,541.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":85},{"i":3498,"cid":"22OF0026","pid":"P00630926LZ","t":"Rehabilitation of Flood Control Structure, Barangay Sta. Lucia, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":73288204.5,"abc":75554850.0,"fy":"2022","sd":"02/16/2022","cd":"2023-02-20","lat":14.739672,"lon":121.051099,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2602},{"i":3499,"cid":"24OD0049","pid":"P00820613LZ","t":"Rehabilitation of Flood Control Wall along Gen. T. de Leon-Parada Creek, Barangay Gen. T. de Leon, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"GILTOP CIVIL ENGINEERING CONSTRUCTION","c":14386264.93,"abc":14679878.2,"fy":"2024","sd":"02/14/2024","cd":"2024-06-12","lat":14.694575,"lon":120.997168,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Gen. T. de Leon-Parada","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gen. T. de Leon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2603},{"i":3500,"cid":"21OD0159","pid":"P00525777LZ","t":"Construction of Drainage Systems along Barangay 160, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":4786494.27,"abc":4899196.68,"fy":"2021","sd":"03/24/2022","cd":"2022-08-15","lat":14.675613,"lon":121.008623,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"160","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2604},{"i":3501,"cid":"24CD0050","pid":"P00820825LZ","t":"Construction of Flood Mitigation Structure, Barangay Gaya-gaya, San Jose del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":48994496.09,"abc":48999758.96,"fy":"2024","sd":"02/12/2024","cd":"2024-09-08","lat":14.807268,"lon":121.051163,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gaya-gaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2605},{"i":3502,"cid":"22OA0095","pid":"P00639403LZ","t":"Rehabilitation (Completion) of Spine Canal, Navotas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS)","c":1953912.61,"abc":1958453.7,"fy":"2022","sd":"03/24/2022","cd":"2022-09-14","lat":14.650815,"lon":120.958997,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":"Spine","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2606},{"i":3503,"cid":"23OE0089","pid":"P00726807LZ","t":"Rehabilitation of Drainage System at Zone 41-57 (Phase 2), Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"V.R. GUEVARRA CONSTRUCTION AND TRADING / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":67542628.6,"abc":67549665.2,"fy":"2023","sd":"03/15/2023","cd":"2024-06-06","lat":14.607663,"lon":120.997215,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":66},{"i":3504,"cid":"22OC0140","pid":"P00620922LZ","t":"Improvement/Sheetpiling of Villanueva Creek Tributary near Bougainville Ave., Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-08-14","lat":14.455373,"lon":121.02678,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.75,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2607},{"i":3505,"cid":"22OG0110","pid":"P00637003LZ","t":"Rehabilitation of San Juan River (Phase IX), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":27759373.96,"abc":28949502.01,"fy":"2022","sd":"05/18/2022","cd":"2023-02-11","lat":14.67439,"lon":121.019873,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":4.67,"wp":[14.63249,121.01508],"wst":"matched","br":null,"len":null,"ph":"Phase IX","dup":[3497,3519],"run":[3641,3689,3462,3451],"cl":[],"L":"records","s":59,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.67,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 4.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 147,943,554.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0107 to 22OG0111) cover the same site, together worth PHP 136,621,674.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":103},{"i":3506,"cid":"21OC0153","pid":"P00561611LZ","t":" Rehabilitation/Upgrading and Drainage Improvement along Kalayaan avenue including sidewalk and driveway, District 2, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"JAYLOT TRADING & CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"05/24/2022","cd":"2022-11-05","lat":14.562424,"lon":121.051248,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2608},{"i":3507,"cid":"22OI0068","pid":"P00620911LZ","t":"Construction of Flood Control Structure, Mahabang Tubig, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48990674.66,"abc":48999400.35,"fy":"2022","sd":"03/04/2022","cd":"2022-10-29","lat":14.419057,"lon":121.008643,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2609},{"i":3508,"cid":"24CF0078","pid":"P00843299LZ","t":"Construction of Flood Control Structure, Barangay Dalampang, Cabanatuan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":71072250.0,"abc":71072170.07,"fy":"2024","sd":"03/20/2024","cd":"2025-02-07","lat":15.53427,"lon":120.95912,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalampang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2610},{"i":3509,"cid":"23OE0086","pid":"P00726808LZ","t":"Construction of Reinforced Concrete Box Culvert (RCBC) along Geronimo Street, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":54088655.12,"abc":54089213.85,"fy":"2023","sd":"03/15/2023","cd":"2024-03-18","lat":14.605152,"lon":120.997216,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":67},{"i":3510,"cid":"24OE0043","pid":"P00823242LZ","t":"Installation of Booster Pump at Estero de Binondo (Package 1b), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":144721297.2,"abc":144749875.7,"fy":"2024","sd":"02/13/2024","cd":"2024-04-17","lat":14.60063,"lon":120.972799,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.60065,120.97283],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3494,3518],"run":[3494,3518],"cl":[],"L":"field","s":63,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 434,028,046.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OE0042 to 24OE0044) cover the same site, together worth PHP 434,028,046.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":13},{"i":3511,"cid":"23OB0346","pid":"P00742239LZ","t":"Construction of Drainage System at Sto Niño Ave From Cor. MRT Ave. to Libis Street Zone 5, Barangay Central Signal, Taguig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J.M.L.R. CONSTRUCTION AND SUPPLY","c":13963924.69,"abc":14699960.37,"fy":"2023","sd":"05/23/2023","cd":"2023-11-10","lat":14.511916,"lon":121.051369,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Central Signal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2611},{"i":3512,"cid":"23CD0059","pid":"P00726521LZ","t":"Construction of Flood Control Structure along Angat River, Matictic Section (Left Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY)","c":86849107.0,"abc":86849257.74,"fy":"2023","sd":"02/27/2023","cd":"2023-08-24","lat":14.907451,"lon":121.051452,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.08,"wp":[14.90742,121.05073],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3739,3753],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0059 to 23CD0061) cover the same site, together worth PHP 260,547,956.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":331},{"i":3513,"cid":"24OC0024","pid":"P00820566LZ","t":"Construction of Revetment along Don Galo River Tributary Near Multinational Avenue, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"REND ENTERPRISES & GENERAL CONTRACTOR","c":48996157.64,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2025-01-02","lat":14.500097,"lon":120.997317,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":0.01,"wp":[14.50009,120.99739],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2612},{"i":3514,"cid":"24OH0047","pid":"P00823254LZ","t":"Construction of Slope Protection at Baseco Compound, Port Area Manila, Sta. 00 + 294.50 to Sta. 0 + 589, Phase 2","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"CAANA CONSTRUCTION CORPORATION","c":96497829.67,"abc":96499859.8,"fy":"2024","sd":"05/27/2024","cd":"2024-10-07","lat":14.584875,"lon":120.959125,"sm":null,"fm":null,"tm":null,"am":1166,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":294.5,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":68},{"i":3515,"cid":"24OG0092","pid":"P00823273LZ","t":"Rehabilitation of Flood Mitigation Structure along Lagarian Creek, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":20248040.3,"abc":20249468.43,"fy":"2024","sd":"03/26/2024","cd":"2024-11-25","lat":14.6254,"lon":121.0268,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.01,"wp":[14.62537,121.02684],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2613},{"i":3516,"cid":"23OI0029","pid":"P00725917LZ","t":"Construction of Flood Control Structure, Buli Creek, Barangay Buli, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":48950838.22,"abc":48999835.42,"fy":"2023","sd":"02/13/2023","cd":"2023-07-12","lat":14.445616,"lon":121.051471,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli River","wd":0.0,"wp":[14.44565,121.05145],"wst":"matched","br":"Buli","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2614},{"i":3517,"cid":"22OH0029","pid":"P00620111LZ","t":"Construction of Slope Protection Structure/Bank Improvement/Sheet Piling of Maricaban Creek (Sta. 0+468 to 0+702), Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AARCON BUILDERS","c":57893459.38,"abc":57895380.25,"fy":"2022","sd":"02/28/2022","cd":"2022-10-25","lat":14.531028,"lon":121.008725,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53103,121.00873],"wst":"matched","br":null,"len":234.0,"ph":null,"dup":[3527],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 81,874,517.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1078},{"i":3518,"cid":"24OE0044","pid":"P00823241LZ","t":"Installation of Booster Pump at Estero de Binondo (Package 1c), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":144558835.1,"abc":144749637.5,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.60063,"lon":120.972799,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.60065,120.97283],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3494,3510],"run":[3494,3510],"cl":[],"L":"field","s":63,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 434,028,046.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OE0042 to 24OE0044) cover the same site, together worth PHP 434,028,046.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":14},{"i":3519,"cid":"22OG0136","pid":"P00620114LZ","t":"Rehabilitation of San Juan River, Phase V, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MSB VITUG CONSTRUCTION","c":77323411.0,"abc":77601797.84,"fy":"2022","sd":"05/24/2022","cd":"2023-02-17","lat":14.67439,"lon":121.019873,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":4.67,"wp":[14.63249,121.01508],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[3497,3505],"run":[3649,3699,3633,3595],"cl":[],"L":"records","s":72,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.67,"text":"The title names San Juan, which OpenStreetMap maps through the stated municipality, but the pin is 4.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 147,943,554.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0132 to 22OG0136) cover the same site, together worth PHP 265,204,819.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":44},{"i":3520,"cid":"22CD0157","pid":"P00639339LZ","t":"Construction of Flood Control Structures along Bulo River Sta. 25+090 - Sta. 25+980, San Miguel Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":96495644.65,"abc":96499829.13,"fy":"2022","sd":"03/30/2022","cd":"2023-02-16","lat":15.23851,"lon":121.02682,"sm":1330,"fm":1330,"tm":null,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":2.04,"wp":[15.23342,121.00859],"wst":"matched","br":null,"len":890.0,"ph":null,"dup":[],"run":[3567,3738,2264,3239,3047,2323,3061,3096,3476],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":281},{"i":3521,"cid":"22OF0200","pid":"P00640487LZ","t":"Construction of Flood Control Structures at Brgy. Baesa, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"FRAMECON BUILDERS","c":28809000.0,"abc":29700000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-14","lat":14.691059,"lon":121.026829,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2615},{"i":3522,"cid":"21OI0023","pid":"P00525475LZ","t":"Construction of Flood Control Structures along Laguna Lake, Barangay Alabang and Barangay and Barangay Cupang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"City of Muntinlupa","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":74703599.44,"abc":74733984.07,"fy":"2021","sd":"04/08/2022","cd":"2022-12-13","lat":14.428836,"lon":121.051629,"sm":407,"fm":null,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Laguna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2616},{"i":3523,"cid":"24CD0132","pid":"P00844747LZ","t":"Construction of Flood Control Structure along Sta. Maria River, Sta. 05+050 - Sta. 05+200 (Poblacion - Macaiban Section), Santa Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":48998694.98,"abc":48999331.86,"fy":"2024","sd":"03/25/2024","cd":"2024-07-09","lat":14.817082,"lon":120.972853,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.02,"wp":[14.81694,120.97292],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2617},{"i":3524,"cid":"22OD0251","pid":"P00637042LZ","t":"Rehabilitation of Drainage along Brgy. 99, Caloocan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"C.L. MORALES CONSTRUCTION AND TRADING","c":21021340.23,"abc":21473676.9,"fy":"2022","sd":"03/24/2022","cd":"2022-10-17","lat":14.653591,"lon":120.997388,"sm":308,"fm":308,"tm":308,"am":1191,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"99","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2618},{"i":3525,"cid":"22OB0161","pid":"P00620086LZ","t":"Improvement/Construction of Slope Protection along Maricaban Creek, Taguig City, Phase II","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"PASCAL CONSTRUCTION","c":91640252.51,"abc":96499494.35,"fy":"2022","sd":"03/21/2022","cd":"2023-09-01","lat":14.53255,"lon":121.026868,"sm":1521,"fm":1521,"tm":1521,"am":398,"md":0.01,"ls":"boundary","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53256,121.02686],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2619},{"i":3526,"cid":"22OD0039","pid":"P00620407LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 174 (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"WAWAO BUILDERS","c":43626337.58,"abc":45068363.51,"fy":"2022","sd":"02/08/2022","cd":"2022-12-13","lat":14.766087,"lon":121.051665,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"174","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2620},{"i":3527,"cid":"23OH0019","pid":"P00726039LZ","t":"Construction of Slope Protection Structure of Maricaban Creek (Sta. 0+468 to Sta. 0+702), Pasay City (Phase 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AARCON BUILDERS","c":23981057.35,"abc":24496286.89,"fy":"2023","sd":"02/20/2023","cd":"2023-08-19","lat":14.531028,"lon":121.008725,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53103,121.00873],"wst":"matched","br":null,"len":234.0,"ph":"Phase 2","dup":[3517],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 81,874,517.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1127},{"i":3528,"cid":"23CC0145","pid":"P00726472LZ","t":"Construction of Riverwall along Angat River, Tanawan Section, Sta. 04+020 to Sta. 04+420, Bustos, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"BUSTOS (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":96499989.39,"abc":96499810.58,"fy":"2023","sd":"02/13/2023","cd":"2023-07-03","lat":14.959167,"lon":120.959167,"sm":265,"fm":265,"tm":265,"am":1352,"md":0.51,"ls":"boundary","ww":"Angat","wn":"Angat River","wd":0.49,"wp":[14.95501,120.95751],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2621},{"i":3529,"cid":"24OC0084","pid":"P00839521LZ","t":"Rehabilitation of Drainage Structure along J.P. Rizal Street (including Sidewalk and Driveway) Phase 2, District I, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":24746494.54,"abc":24750000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-11-19","lat":14.570999,"lon":121.019876,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2622},{"i":3530,"cid":"21OI0017","pid":"P00525477LZ","t":"Construction of Flood Control Structures along Laguna Lake, Barangay Cupang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"City of Muntinlupa","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":74204302.44,"abc":74304910.06,"fy":"2021","sd":"04/08/2022","cd":"2022-12-13","lat":14.43826,"lon":121.051751,"sm":407,"fm":null,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Laguna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cupang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2623},{"i":3531,"cid":"22CD0043","pid":"P00620190LZ","t":"Improvement of Poblacion - Sta. Clara Creek, Sta. Maria River Improvement, Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":95533084.87,"abc":95529083.49,"fy":"2022","sd":"03/07/2022","cd":"2023-04-15","lat":14.82024,"lon":120.95967,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Clara","wn":"Estero de Sta. Clara","wd":27.7,"wp":[14.57524,121.0124],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2624},{"i":3532,"cid":"23OI0032","pid":"P00725913LZ","t":"Construction of Flood Control Structure, Zapote River, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":48993363.57,"abc":48996719.42,"fy":"2023","sd":"08/22/2023","cd":"2023-12-19","lat":14.44086,"lon":120.97318,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.02,"wp":[14.44077,120.97307],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3535],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,240,765.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":917},{"i":3533,"cid":"22BC0081","pid":"P00631106LZ","t":"Construction of Flood Control Structure along Langgangan River, Sanjera San Pablo of Brgy. Capacuan, Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA PRAXEDES (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"HHK CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-01","lat":18.54963,"lon":120.99745,"sm":1400,"fm":1400,"tm":1400,"am":1400,"md":0.0,"ls":"inside","ww":"Langgangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Capacuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2625},{"i":3534,"cid":"22CD0019","pid":"P00620158LZ","t":"Construction of Flood Control Structure at Maasim River Diliman I Section, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":50062322.96,"abc":57899715.58,"fy":"2022","sd":"03/07/2022","cd":"2022-10-09","lat":15.02767,"lon":120.95977,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":3.19,"wp":[15.03715,120.93179],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.19,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 3.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":353},{"i":3535,"cid":"23OI0078","pid":"P00742213LZ","t":"Construction of Flood Control Structures, Road and Other Improvements along Zapote River, Barangay Talon 2, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":48247401.06,"abc":48247584.06,"fy":"2023","sd":"04/26/2023","cd":"2023-10-22","lat":14.440855,"lon":120.973181,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.01,"wp":[14.44077,120.97307],"wst":"matched","br":"Talon 2","len":null,"ph":null,"dup":[3532],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,240,765.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":918},{"i":3536,"cid":"23OD0035","pid":"P00725994LZ","t":"Construction of Box Culvert at 3S Compound, Barangay Ugong, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":47937648.46,"abc":48965960.55,"fy":"2023","sd":"02/21/2023","cd":"2024-01-16","lat":14.694456,"lon":121.008726,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ugong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2626},{"i":3537,"cid":"22OG0124","pid":"P00621436LZ","t":"Rehabilitation of Flood Control Structure, Lagarian Creek, Barangay Kristong Hari, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":29359033.65,"abc":29399259.72,"fy":"2022","sd":"06/03/2022","cd":"2023-11-19","lat":14.625498,"lon":121.027026,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.01,"wp":[14.62554,121.02697],"wst":"matched","br":"Kristong Hari","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2627},{"i":3538,"cid":"24CF0024","pid":"P00821239LZ","t":"Construction of Flood Control Structure along Peñaranda River, Barangay Concepcion, General Tinio, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GENERAL TINIO (PAPAYA) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":78064126.73,"abc":79657828.73,"fy":"2024","sd":"04/02/2024","cd":"2024-06-18","lat":15.34399,"lon":121.05181,"sm":579,"fm":579,"tm":579,"am":579,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.07,"wp":[15.34351,121.05225],"wst":"matched","br":"Concepcion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2628},{"i":3539,"cid":"22DQ0069","pid":"P00640461LZ","t":"Construction of Revetment along Maliksi River (tributary to Manila Bay), Phase 2, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"GRAIA CONSTRUCTION CORPORATION","c":98999140.73,"abc":98999998.58,"fy":"2022","sd":"04/07/2022","cd":"2023-12-07","lat":14.46621,"lon":120.96012,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Maliksi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2629},{"i":3540,"cid":"23OG0057","pid":"P00727040LZ","t":"Rehabilitation of Drainage System at K-6th Street, Barangay Kamuning, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"LIM GENERAL CONTRACTOR CORPORATION","c":19597930.63,"abc":19599721.32,"fy":"2023","sd":"03/13/2023","cd":"2024-08-07","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kamuning","len":null,"ph":null,"dup":[3541,3549,3555,3568,3578,3579],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":552},{"i":3541,"cid":"23OG0063","pid":"P00727034LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XVIII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":47907420.63,"abc":48999960.85,"fy":"2023","sd":"03/13/2023","cd":"2023-11-07","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XVIII","dup":[3540,3549,3555,3568,3578,3579],"run":[3549,3555,3568,3578,3579],"cl":[],"L":"field","s":56,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":67},{"i":3542,"cid":"22OF0038","pid":"P00631045LZ","t":"Rehabilitation of Drainage, Road 2, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":9799221.86,"abc":9799221.86,"fy":"2022","sd":"02/14/2022","cd":"2022-08-10","lat":14.716751,"lon":121.051852,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2630},{"i":3543,"cid":"24OD0019","pid":"P00820599LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Barangay 166, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":47926860.63,"abc":48979948.11,"fy":"2024","sd":"02/27/2024","cd":"2024-06-10","lat":14.725663,"lon":121.009204,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"166","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2631},{"i":3544,"cid":"24OE0116","pid":"P00838476LZ","t":"Rehabilitation of Drainage System at Zone 41-57 (Phase 3), Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":29086241.46,"abc":29086248.43,"fy":"2024","sd":"02/12/2024","cd":"2025-02-10","lat":14.60529,"lon":120.997544,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":69},{"i":3545,"cid":"21OE0021","pid":"P00525820LZ","t":"Rehabilitation/Improvement of Pacheco Drainage Main and Construction of Pumping Station, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48403077.09,"abc":48999936.11,"fy":"2021","sd":"03/30/2022","cd":"2023-05-30","lat":14.61452,"lon":120.96014,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":70},{"i":3546,"cid":"22OF0031","pid":"P00631050LZ","t":"Rehabilitation of Flood Control Structure, Barangay Pasong Putik, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"INDUSTRIAL CONTROLS CORPORATION (ICC)","c":14470000.0,"abc":14700000.0,"fy":"2022","sd":"02/14/2022","cd":"2023-08-12","lat":14.711341,"lon":121.051856,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasong Putik","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2632},{"i":3547,"cid":"23D00166","pid":"P00742423LZ","t":"Construction of Flood Control Structures, Road and Other Improvements, Zapote River, Brgy. Molino 4, Bacoor, Cavite (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":42568425.04,"abc":42570000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-02-11","lat":14.37808,"lon":121.00933,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.16,"wp":[14.37794,121.01085],"wst":"matched","br":"Molino 4","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2633},{"i":3548,"cid":"23OI0015","pid":"P00725919LZ","t":"Construction of Flood Control Structure, Southville 3, Barangay Poblacion, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"A.M. ORETA & CO., INC.","c":48998765.74,"abc":48999999.84,"fy":"2023","sd":"02/13/2023","cd":"2024-03-21","lat":14.377278,"lon":121.027214,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2634},{"i":3549,"cid":"23OG0064","pid":"P00727035LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XIX), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":48963617.7,"abc":48999847.45,"fy":"2023","sd":"03/13/2023","cd":"2023-11-07","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XIX","dup":[3540,3541,3555,3568,3578,3579],"run":[3541,3555,3568,3578,3579],"cl":[],"L":"field","s":60,"sig":[{"code":"shared_pin","group":"risk","strength":0.75,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":23},{"i":3550,"cid":"24OH0025","pid":"P00820095LZ","t":"Rehabilitation of Luneta Pumping Station at Katigbak Parkway, Ermita, Manila City - Phase I","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96492658.53,"abc":96497130.68,"fy":"2024","sd":"02/20/2024","cd":"2024-08-17","lat":14.581831,"lon":120.973307,"sm":550,"fm":null,"tm":550,"am":1166,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[3553],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,983,475.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":754},{"i":3551,"cid":"22OD0100","pid":"P00620396LZ","t":"Construction of Flood Control Wall along the Banks of Creek, Brgy. 167, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":28749240.3,"abc":29395958.2,"fy":"2022","sd":"02/08/2022","cd":"2022-11-14","lat":14.73677,"lon":121.00937,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"167","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2635},{"i":3552,"cid":"22DI0050","pid":"P00620221LZ","t":"Construction of Revetment / Riverwall along Tunasan Waterways, Brgy. San Antonio, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":91641226.89,"abc":91675000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-03-05","lat":14.36259,"lon":121.02727,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2636},{"i":3553,"cid":"24OH0045","pid":"P00820096LZ","t":"Rehabilitation of Luneta Pumping Station at Katigbak Parkway, Ermita, Manila City - Phase II","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96490816.38,"abc":96499274.78,"fy":"2024","sd":"02/21/2024","cd":"2024-09-17","lat":14.581831,"lon":120.973307,"sm":550,"fm":null,"tm":550,"am":1166,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[3550],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,983,475.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":755},{"i":3554,"cid":"22CD0163","pid":"P00639345LZ","t":"Construction of Flood Control Structure along Maasim River, Sta. 06+600 - Sta. 07+200, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"KATHA BUILDERS & SUPPLIES INC.","c":95050950.34,"abc":96499878.74,"fy":"2022","sd":"03/30/2022","cd":"2023-06-07","lat":15.02837,"lon":120.96024,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":3.21,"wp":[15.03715,120.93179],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[2945,2964],"cl":[],"L":"records","s":61,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.21,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 3.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22CD0161 to 22CD0163) cover the same site, together worth PHP 285,153,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":93},{"i":3555,"cid":"23OG0065","pid":"P00727036LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XX), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":48963617.7,"abc":48999751.06,"fy":"2023","sd":"03/13/2023","cd":"2023-11-07","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XX","dup":[3540,3541,3549,3568,3578,3579],"run":[3541,3549,3568,3578,3579],"cl":[],"L":"field","s":60,"sig":[{"code":"shared_pin","group":"risk","strength":0.75,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":24},{"i":3556,"cid":"23CE0007","pid":"P00726167LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Gomez, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SYMMETRICON BUILDERS CORP.","c":23139000.0,"abc":23142700.0,"fy":"2023","sd":"02/21/2023","cd":"2023-05-04","lat":15.687,"lon":120.997561,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.04,"wp":[15.68714,120.99719],"wst":"matched","br":"Gomez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2637},{"i":3557,"cid":"22DC0077","pid":"P00632872LZ","t":"Construction of Line Canal in the Muncipality of Cuenca, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CUENCA (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"P-SQUARE CONTRACTING & SERVICES","c":4949178.0,"abc":4950000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-07-02","lat":13.881589,"lon":121.052091,"sm":463,"fm":463,"tm":180,"am":463,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":5.44,"text":"The record contradicts itself: the municipality field and the pin point to Cuenca, Batangas, but the title names Batangas City, Batangas, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":625},{"i":3558,"cid":"21OC0169","pid":"P00525764LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Service Road of Parañaque River (Northwest Section), Brgy. Tambo, Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"CALCON ENGINEERING","c":9800000.0,"abc":9800000.0,"fy":"2021","sd":"02/22/2022","cd":"2022-09-19","lat":14.516778,"lon":120.997597,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Parañaque","wn":"Parañaque River","wd":0.04,"wp":[14.51667,120.99792],"wst":"matched","br":"Tambo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2638},{"i":3559,"cid":"24OC0027","pid":"P00820575LZ","t":"Rehabilitation of Drainage System along Quirino & De Leon Street (Phase II), Malacañang Village, Barangay San Antonio, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"GRAC-TA BUILDERS","c":29395942.48,"abc":29400000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-07-22","lat":14.4751,"lon":121.027286,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2639},{"i":3560,"cid":"23CD0043","pid":"P00726162LZ","t":"Construction of Concrete Floating Excavation Ramp at Marilao and Meycauayan, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"MARILAO (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"747 BUILDERS & TRADERS,INC. (FORMERLY:747 BUILDERS & TRADER)","c":19597861.13,"abc":19598950.18,"fy":"2023","sd":"02/27/2023","cd":"2023-12-29","lat":14.737817,"lon":120.973352,"sm":941,"fm":941,"tm":248,"am":406,"md":1.97,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.97,"text":"The record contradicts itself: the municipality field and the pin point to Marilao, Bulacan, but the title names Bulacan, Bulacan, 7 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":606},{"i":3561,"cid":"22OE0074","pid":"P00620431LZ","t":"Construction (Completion) of Pump at Pacheco Drainage Main, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":23470297.9,"abc":24499986.79,"fy":"2022","sd":"02/17/2022","cd":"2023-09-07","lat":14.614332,"lon":120.960251,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":71},{"i":3562,"cid":"23DQ0004","pid":"P00726220LZ","t":"Construction of Revetment (Reinforced Concrete) along Carmona River, Phase 2, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"AARCON BUILDERS","c":44099979.64,"abc":88199984.47,"fy":"2023","sd":"02/16/2023","cd":"2023-09-18","lat":14.30775,"lon":121.05214,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":0.92,"wp":[14.30468,121.06007],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2640},{"i":3563,"cid":"23D00163","pid":"P00742176LZ","t":"Construction of Flood Control Structures and Other Improvements, Zapote River, Brgy Molino 4, Bacoor, Cavite (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":79199149.37,"abc":79200000.0,"fy":"2023","sd":"07/17/2023","cd":"2024-04-05","lat":14.37675,"lon":121.0094,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.14,"wp":[14.37675,121.01066],"wst":"matched","br":"Molino 4","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2641},{"i":3564,"cid":"22OI0136","pid":"P00631006LZ","t":"Rehabilitation of Road and Drainage System at Brgy. Manuyo 2, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"MRJR CONSTRUCTION & TRADING","c":9792108.32,"abc":9799920.44,"fy":"2022","sd":"06/13/2022","cd":"2022-10-10","lat":14.4629,"lon":120.997651,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manuyo 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2642},{"i":3565,"cid":"22OB0243","pid":"P00621134LZ","t":"Construction of Slope Protection along Salapan Creek, San Juan City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAWAO BUILDERS","c":75344255.34,"abc":79349938.81,"fy":"2022","sd":"03/24/2022","cd":"2023-03-12","lat":14.612302,"lon":121.02745,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Salapan","wn":"Salapan Creek","wd":0.01,"wp":[14.61238,121.02744],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2643},{"i":3566,"cid":"24OE0105","pid":"P00820622LZ","t":"Construction of Flood Mitigation Structure along Estero de Binondo, Barangay 281, Manila City","w":"Construction of Revetment","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"MANGEN TECHNO-BUILDERS INC.","c":11489445.53,"abc":11759918.73,"fy":"2024","sd":"02/12/2024","cd":"2024-06-15","lat":14.59958,"lon":120.97336,"sm":null,"fm":null,"tm":null,"am":1343,"md":null,"ls":"unknown","ww":"de Binondo","wn":"Estero de Binondo","wd":0.0,"wp":[14.59959,120.97339],"wst":"matched","br":"281","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":72},{"i":3567,"cid":"22CD0151","pid":"P00639481LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 14+800 - Sta. 15+100, Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48997970.99,"abc":48999932.94,"fy":"2022","sd":"03/30/2022","cd":"2023-02-28","lat":15.22617,"lon":120.99775,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.01,"wp":[15.2262,120.9978],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[3738,2264,3239,3047,2323,3520,3061,3096,3476],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":523},{"i":3568,"cid":"23OG0066","pid":"P00727037LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XXI), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48938414.23,"abc":48999734.05,"fy":"2023","sd":"03/13/2023","cd":"2023-09-14","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XXI","dup":[3540,3541,3549,3555,3578,3579],"run":[3541,3549,3555,3578,3579],"cl":[],"L":"field","s":57,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":64},{"i":3569,"cid":"22OD0101","pid":"P00620404LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 170, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":28736038.44,"abc":29397500.73,"fy":"2022","sd":"02/08/2022","cd":"2022-12-12","lat":14.731261,"lon":121.027506,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"170","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2644},{"i":3570,"cid":"22OA0061","pid":"P00631018LZ","t":"Construction of Box-Culvert Drainage along Sanciangco St. (Gov. Pascual Ave. to Bustamante St.), Malabon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"SKYSCRAPERPH CONSTRUCTION CORPORATION","c":9800000.0,"abc":9799986.91,"fy":"2022","sd":"02/15/2022","cd":"2022-08-26","lat":14.670641,"lon":120.9606,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2645},{"i":3571,"cid":"24OH0022","pid":"P00820658LZ","t":"Construction of Drainage System Tejeron St., (Phase II) Syquia St. to Zobel Roxas, Sta. Ana, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"N.M.E. CONSTRUCTION","c":39172274.95,"abc":39199925.82,"fy":"2024","sd":"02/21/2024","cd":"2024-11-06","lat":14.578444,"lon":121.009489,"sm":1369,"fm":null,"tm":1369,"am":1369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2646},{"i":3572,"cid":"24DQ0038","pid":"P00839616LZ","t":"Construction of Flood Control Structure, Barangay Pob 3, Pob 1, San Vicente I, San Vicente II, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"CMMJ CONSTRUCTION","c":9899185.43,"abc":9899914.61,"fy":"2024","sd":"03/28/2024","cd":"2024-08-22","lat":14.22985,"lon":120.97337,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pob 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2647},{"i":3573,"cid":"21OD0153","pid":"P00525789LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 171, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":14480400.62,"abc":14885113.08,"fy":"2021","sd":"02/24/2022","cd":"2022-07-04","lat":14.766439,"lon":121.027597,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"171","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2648},{"i":3574,"cid":"23OI0048","pid":"P00742215LZ","t":"Rehabilitation of Drainage, Pamplona 1, Las Piñas City (Phase II)","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"OMNICON BUILDERS","c":4897852.55,"abc":4899916.84,"fy":"2023","sd":"04/17/2023","cd":"2023-07-30","lat":14.45914,"lon":120.9736,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2649},{"i":3575,"cid":"23DQ0007","pid":"P00737513LZ","t":"Construction of Drainage, Barangay Kapitan Kua, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":4949903.67,"abc":19799810.39,"fy":"2023","sd":"02/15/2023","cd":"2023-08-17","lat":14.30692,"lon":121.00956,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kapitan Kua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2650},{"i":3576,"cid":"23DE0047","pid":"P00740394LZ","t":"Construction of Seawall with embankment, Brgy. San Andres, Bauan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BAUAN (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":19300000.0,"abc":19600000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-08-15","lat":13.7821,"lon":120.9978,"sm":187,"fm":187,"tm":187,"am":187,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Andres","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2651},{"i":3577,"cid":"22OA0049","pid":"P00631025LZ","t":"Construction of Remegio Pumping Station, Brgy. Maysilo, Malabon City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":19599961.42,"abc":19591615.15,"fy":"2022","sd":"02/15/2022","cd":"2022-08-17","lat":14.675022,"lon":120.960684,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maysilo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2652},{"i":3578,"cid":"23OG0067","pid":"P00727038LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XXII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":48948822.01,"abc":48999524.26,"fy":"2023","sd":"03/13/2023","cd":"2023-09-14","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XXII","dup":[3540,3541,3549,3555,3568,3579],"run":[3541,3549,3555,3568,3579],"cl":[],"L":"field","s":57,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":65},{"i":3579,"cid":"23OG0068","pid":"P00727039LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XXIII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":48904450.12,"abc":48999620.65,"fy":"2023","sd":"03/13/2023","cd":"2023-09-14","lat":14.6117,"lon":121.0199,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.6117,121.01988],"wst":"matched","br":null,"len":null,"ph":"Phase XXIII","dup":[3540,3541,3549,3555,3568,3578],"run":[3541,3549,3555,3568,3578],"cl":[],"L":"field","s":57,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":6,"text":"6 other contract(s) with different titles use this exact pin, 6 of them funded in the same year. Combined value at this pin: PHP 312,224,273.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (23OG0063 to 23OG0068) cover the same site, together worth PHP 292,626,342.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":66},{"i":3580,"cid":"21OI0022","pid":"P00525476LZ","t":"Construction of Flood Control Structures along Laguna Lake, Barangay Alabang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"City of Muntinlupa","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":74291808.62,"abc":74304723.04,"fy":"2021","sd":"04/08/2022","cd":"2022-12-13","lat":14.42183,"lon":121.052173,"sm":407,"fm":null,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Laguna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2653},{"i":3581,"cid":"23OC0060","pid":"P00725540LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Baliuag Creek near Merville Gate 1, District 2, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":91674500.46,"abc":91675000.0,"fy":"2023","sd":"02/15/2023","cd":"2024-11-04","lat":14.505762,"lon":121.027799,"sm":411,"fm":411,"tm":411,"am":1107,"md":0.02,"ls":"boundary","ww":"Baliuag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2654},{"i":3582,"cid":"22DI0068","pid":"P00620589LZ","t":"Construction of River Protection Structure near Bayanbayanan Bridge, Brgy.San Vicente, San Pedro City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":44052051.78,"abc":44100000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-01-12","lat":14.34407,"lon":121.02,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":499},{"i":3583,"cid":"22OI0060","pid":"P00620762LZ","t":"Construction (Completion) of Flood Control Structure along Laguna Lake, Barangay Cupang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":91567097.47,"abc":91667472.14,"fy":"2022","sd":"02/17/2022","cd":"2022-12-28","lat":14.427222,"lon":121.052222,"sm":407,"fm":407,"tm":407,"am":407,"md":0.04,"ls":"boundary","ww":"Laguna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cupang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2655},{"i":3584,"cid":"23CD0146","pid":"P00726504LZ","t":"Construction of Flood Control Facilities Lawa Pumping Stations, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":55126251.2,"abc":55965737.26,"fy":"2023","sd":"05/18/2023","cd":"2024-02-17","lat":14.738,"lon":120.9736,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2656},{"i":3585,"cid":"24CF0075","pid":"P00838527LZ","t":"Construction of Drainage Structure along Road, Peñaranda, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PEÑARANDA (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"N.C. AGUILAR CONST. & SUPPLY INC.","c":19305542.09,"abc":19599996.35,"fy":"2024","sd":"03/25/2024","cd":"2024-12-29","lat":15.3502,"lon":120.9978,"sm":1119,"fm":1119,"tm":1119,"am":1119,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2657},{"i":3586,"cid":"23OH0015","pid":"P00725510LZ","t":"Construction of Slope Protection Structure of Maricaban Creek (Sta. 0+702 to 0+936), Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"CAANA CONSTRUCTION CORPORATION","c":61218798.82,"abc":62723812.58,"fy":"2023","sd":"02/23/2023","cd":"2023-09-15","lat":14.531019,"lon":121.009585,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53101,121.00954],"wst":"matched","br":null,"len":234.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2658},{"i":3587,"cid":"24OD0079","pid":"P00824606LZ","t":"Construction of Reinforced Concrete Box Culvert Along C-3 Road (Caloocan/Navotas Boundary - Dagat-Dagatan Avenue), Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC. / NOVA VENTUS CONSTRUCTION INC.","c":38296975.74,"abc":39199953.48,"fy":"2024","sd":"02/27/2024","cd":"2024-10-01","lat":14.643512,"lon":120.96091,"sm":308,"fm":308,"tm":308,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2659},{"i":3588,"cid":"22OC0135","pid":"P00637040LZ","t":"Construction of Revetment Wall along Bangkal Creek, Brgy. Bangkal, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING) / RJM CONSTRUCTION AND DEV'T., INC.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-10-24","lat":14.543656,"lon":121.009775,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Bangkal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bangkal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2660},{"i":3589,"cid":"22OD0048","pid":"P00631034LZ","t":"Rehabilitation of Drainage along Dela Cruz St., Brgy. Bagbaguin, Valenzuela","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":4793303.64,"abc":4891153.98,"fy":"2022","sd":"02/08/2022","cd":"2022-07-18","lat":14.712464,"lon":120.997841,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbaguin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2661},{"i":3590,"cid":"22OA0033","pid":"P00620342LZ","t":"Construction of Riverwall along Malabon-Tullahan River (Phase 3), Brgy. Potrero, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999339.55,"abc":48998662.83,"fy":"2022","sd":"02/14/2022","cd":"2023-02-08","lat":14.675933,"lon":120.973647,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Potrero","len":null,"ph":"Phase 3","dup":[],"run":[3788,3600],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OA0032 to 22OA0034) cover the same site, together worth PHP 165,515,366.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":524},{"i":3591,"cid":"23OD0048","pid":"P00736165LZ","t":"Construction of Flood Control Wall along Bank of Creek in Barangay 171 (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DREAMWORX BUILDER & TRADING, INC.","c":28779766.07,"abc":29397127.94,"fy":"2023","sd":"02/21/2023","cd":"2023-05-22","lat":14.758559,"lon":121.020009,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"171","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2662},{"i":3592,"cid":"22CD0018","pid":"P00631220LZ","t":"Construction of Flood Control Structure, Barangay Muzon, Dulong Bayan, San Jose Del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":39194488.63,"abc":39199988.09,"fy":"2022","sd":"03/30/2022","cd":"2023-02-14","lat":14.81997,"lon":121.02805,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Muzon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2663},{"i":3593,"cid":"22OA0060","pid":"P00631023LZ","t":"Construction of Marala Pumping Station, Navotas City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"NAVOTAS CITY","mu":"CITY OF NAVOTAS (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"CATTECORYLL CONSTRUCTION & TRADING CORP","c":19592636.68,"abc":19599868.18,"fy":"2022","sd":"02/15/2022","cd":"2022-09-23","lat":14.636649,"lon":120.961047,"sm":409,"fm":409,"tm":409,"am":409,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2664},{"i":3594,"cid":"23OB0345","pid":"P00742237LZ","t":"Construction of Drainage System at Zone 1, Zone 2, Zone 7 and Zone 8, Barangay Fort Bonifacio, Taguig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":26064196.17,"abc":27439309.69,"fy":"2023","sd":"06/09/2023","cd":"2024-02-02","lat":14.544405,"lon":121.052278,"sm":1521,"fm":1521,"tm":1521,"am":398,"md":0.24,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fort Bonifacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2665},{"i":3595,"cid":"22OG0135","pid":"P00621266LZ","t":"Improvement of San Juan River (Phase XIII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) / DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":92639372.03,"abc":96499498.81,"fy":"2022","sd":"05/19/2022","cd":"2023-07-12","lat":14.616996,"lon":121.020013,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61709,121.02023],"wst":"matched","br":null,"len":null,"ph":"Phase XIII","dup":[],"run":[3649,3699,3633,3519],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0132 to 22OG0136) cover the same site, together worth PHP 265,204,819.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":332},{"i":3596,"cid":"22OB0026","pid":"P00620364LZ","t":"Improvement of Maytunas Creek, Mandaluyong City (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MANDALUYONG CITY","mu":"CITY OF MANDALUYONG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":42808974.2,"abc":45079586.32,"fy":"2022","sd":"02/08/2022","cd":"2022-10-05","lat":14.595324,"lon":121.028084,"sm":402,"fm":402,"tm":402,"am":417,"md":0.0,"ls":"inside","ww":"Maytunas","wn":"Maytunas Creek","wd":0.0,"wp":[14.59534,121.02809],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2666},{"i":3597,"cid":"23CD0058","pid":"P00725759LZ","t":"Construction of Flood Control Structure along Sta. Maria River at barangay Poblacion to barangay Bagbaguin, Sta. Maria, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":86843630.91,"abc":86849719.08,"fy":"2023","sd":"02/27/2023","cd":"2024-04-06","lat":14.815381,"lon":120.961083,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":"Sta. Maria","wn":"Santa Maria River","wd":0.02,"wp":[14.81528,120.96096],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2667},{"i":3598,"cid":"24OH0033","pid":"P00820656LZ","t":"Construction of Drainage System along Arellano St., Paco, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"1129 BUILDERS","c":29395548.76,"abc":29399708.96,"fy":"2024","sd":"02/21/2024","cd":"2025-01-13","lat":14.567879,"lon":120.997968,"sm":1048,"fm":null,"tm":1048,"am":1369,"md":0.79,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2668},{"i":3599,"cid":"22OC0102","pid":"P00620917LZ","t":"Improvement of Slope Protection of Baloc-Baloc Creek (Phase II), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":27900600.0,"abc":29400000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-11-17","lat":14.482701,"lon":121.009944,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Baloc-Baloc","wn":"Baloc-Baloc Creek","wd":0.0,"wp":[14.48271,121.00994],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2669},{"i":3600,"cid":"22OA0034","pid":"P00620343LZ","t":"Construction of Riverwall along Malabon-Tullahan River (Phase 4), Brgy. Potrero, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999075.67,"abc":48996551.8,"fy":"2022","sd":"02/14/2022","cd":"2023-02-08","lat":14.677819,"lon":120.974005,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Potrero","len":null,"ph":"Phase 4","dup":[],"run":[3788,3590],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OA0032 to 22OA0034) cover the same site, together worth PHP 165,515,366.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":525},{"i":3601,"cid":"22OC0006","pid":"P00620028LZ","t":"Construction of Groundsill/Revetment Wall along Calatagan Creek, Brgy. Palanan, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"SMPE CONSTRUCTION TRADING CORPORATION (FORMERLY: SMPE CONSTRUCTION SUPPLIES TRADING)","c":85286022.0,"abc":86850000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-05-01","lat":14.559469,"lon":120.998084,"sm":398,"fm":398,"tm":398,"am":1107,"md":0.1,"ls":"boundary","ww":"Calatagan","wn":"Calatagan Creek","wd":0.15,"wp":[14.55945,120.99944],"wst":"matched","br":"Palanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2670},{"i":3602,"cid":"23OE0198","pid":"P00742243LZ","t":"Construction of Retarding Basin at Brgy 129, Vitas, Tondo, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":41576933.09,"abc":41579763.89,"fy":"2023","sd":"03/20/2023","cd":"2023-09-19","lat":14.629375,"lon":120.961587,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"129","len":null,"ph":null,"dup":[3610],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 106,048,126.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1115},{"i":3603,"cid":"21CD0131","pid":"P00561531LZ","t":"Construction of Flood Control Structures along Lambakin Sta. 20+150- Sta. 21+050, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"San Miguel","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":47034974.07,"abc":48999868.8,"fy":"2021","sd":"03/30/2022","cd":"2023-06-26","lat":15.238642,"lon":121.009974,"sm":1330,"fm":null,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2671},{"i":3604,"cid":"22OC0021","pid":"P00620372LZ","t":"Rehabilitation/ Upgrading and Drainage Improvement along Banaba St., Mangga St., and its Vicinity, Brgy. Cembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":22540000.0,"abc":22540000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.56346,"lon":121.052321,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2672},{"i":3605,"cid":"23DI0123","pid":"P00742436LZ","t":"Construction of River Bank Protection Structure, Brgy. Riverside, San Pedro City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":29690058.97,"abc":29700000.0,"fy":"2023","sd":"05/23/2023","cd":"2023-12-09","lat":14.331708,"lon":121.028556,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Riverside","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2673},{"i":3606,"cid":"23DQ0086","pid":"P00742168LZ","t":"Construction of Revetment along Imus River (East and West Side), Brgy. Tubuan and Brgy. Iba, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"SELPHAR CONSTRUCTION / N.B. AVILA CONSTRUCTION","c":98998197.62,"abc":98999944.79,"fy":"2023","sd":"05/10/2023","cd":"2023-11-09","lat":14.2122,"lon":120.97408,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.2122,120.97404],"wst":"matched","br":"Tubuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2674},{"i":3607,"cid":"23DC0064","pid":"P00742391LZ","t":"Construction of Drainage Structure, Brgy. Zone 5, Mun. of Talisay, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MALVAR (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"OIC CONZTRUCT AND SUPPLY CORPORATION(FORMERLY:OIC CONST.)","c":4949608.5,"abc":4950000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-18","lat":14.094425,"lon":121.020079,"sm":905,"fm":905,"tm":180,"am":1530,"md":10.48,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.48,"text":"The pin is 10.5 km outside Malvar, Batangas, the nearest municipality the record claims. It falls in Talisay, Batangas.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":323},{"i":3608,"cid":"23OB0110","pid":"P00737390LZ","t":"Construction of Slope Protection along Salapan Creek, Barangay Salapan, San Juan City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":46526297.54,"abc":48999971.04,"fy":"2023","sd":"02/06/2023","cd":"2023-06-18","lat":14.612082,"lon":121.028648,"sm":417,"fm":417,"tm":417,"am":1191,"md":0.0,"ls":"inside","ww":"Salapan","wn":"Salapan Creek","wd":0.0,"wp":[14.61206,121.02865],"wst":"matched","br":"Salapan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2675},{"i":3609,"cid":"22CD0011","pid":"P00620521LZ","t":"Construction of additional Pumping Station at Barangay Lawa, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":19599270.94,"abc":19607596.69,"fy":"2022","sd":"02/28/2022","cd":"2022-08-01","lat":14.73835,"lon":120.9742,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2676},{"i":3610,"cid":"24OE0001","pid":"P00820056LZ","t":"Construction of Pumping Station at Barangay 129, Vitas, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"A.M. SALONG CONSTRUCTION","c":64471193.37,"abc":66002947.02,"fy":"2024","sd":"02/08/2024","cd":"2024-04-15","lat":14.629375,"lon":120.961587,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"129","len":null,"ph":null,"dup":[3602],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 106,048,126.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1079},{"i":3611,"cid":"21OC0185","pid":"P00525762LZ","t":"Upgrading/Drainage Improvement of BF Parklane, District I, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"JALENZ CONSTRUCTION & SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2021","sd":"02/22/2022","cd":"2022-09-03","lat":14.466776,"lon":121.010063,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2677},{"i":3612,"cid":"24BC0096","pid":"P00845934LZ","t":"Construction of Union Flood Control Structure along Cadcadir River, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":4898635.01,"abc":4950000.0,"fy":"2024","sd":"04/04/2024","cd":"2024-06-13","lat":18.5539,"lon":121.052351,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cadcadir","wn":"Cadcadir River","wd":0.14,"wp":[18.55499,121.05161],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2678},{"i":3613,"cid":"21OE0090","pid":"P00525818LZ","t":"Construction of Retention Basin along Estero de Sampaloc Phase III, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":46744194.3,"abc":48999662.04,"fy":"2021","sd":"03/24/2021","cd":"2022-08-20","lat":14.601943,"lon":120.998161,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc Phase III","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":73},{"i":3614,"cid":"22D00100","pid":"P00640555LZ","t":"Construction of Flood Control Structure along Zapote River, Barangay Molino 4, Bacoor City, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":19794810.23,"abc":19800000.0,"fy":"2022","sd":"05/11/2023","cd":"2023-11-06","lat":14.3749,"lon":121.0101,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.07,"wp":[14.3749,121.01072],"wst":"matched","br":"Molino 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2679},{"i":3615,"cid":"23D00123","pid":"P00725787LZ","t":"Construction of Revetment along San Isidro River, Phase 1, Brgy. Maderan, General Mariano Alvarez, Cavite","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"T.E. TRINIDAD CONSTRUCTION / KLDS TRADING & CONSTRUCTION","c":106148617.7,"abc":106150000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-05-21","lat":14.298236,"lon":120.998183,"sm":570,"fm":1455,"tm":570,"am":382,"md":0.08,"ls":"boundary","ww":"San Isidro","wn":"San Isidro","wd":19.4,"wp":[14.47354,121.00247],"wst":"matched","br":"Maderan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2680},{"i":3616,"cid":"24C00512","pid":"P00845781LZ","t":"Construction of Flood Mitigation Structure along Madlum River FSRR, Brgy. Tartaro, San Miguel, Bulacan (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999298.67,"abc":98999617.56,"fy":"2024","sd":"06/20/2024","cd":"2025-01-13","lat":15.1647,"lon":121.0524,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Madlum","wn":"Madlum River","wd":3.13,"wp":[15.17028,121.0809],"wst":"matched","br":"Tartaro","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.13,"text":"The title names Madlum, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":299},{"i":3617,"cid":"22CD0009","pid":"P00620519LZ","t":"Construction of additional Pumping Station at Barangay Banga, Meycauayan, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"AZUL BUILDERS","c":19005606.97,"abc":19314641.23,"fy":"2022","sd":"02/28/2022","cd":"2022-10-03","lat":14.73041,"lon":120.96174,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2681},{"i":3618,"cid":"22DQ0024","pid":"P00632877LZ","t":"Construction of Box Culvert, Barangay Mariano Dacon, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":4949953.47,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.31811,"lon":121.02893,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mariano Dacon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2682},{"i":3619,"cid":"24OE0056","pid":"P00820012LZ","t":"Construction of Drainage along Makisig St. (Phase II), Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":56694104.59,"abc":57899919.16,"fy":"2024","sd":"02/08/2024","cd":"2024-12-10","lat":14.589557,"lon":121.020112,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":74},{"i":3620,"cid":"24C00474","pid":"P00823420LZ","t":"Construction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":96499350.3,"abc":96499205.99,"fy":"2024","sd":"07/15/2024","cd":"2025-01-13","lat":15.165,"lon":121.0525,"sm":1330,"fm":1330,"tm":null,"am":1330,"md":0.0,"ls":"inside","ww":"Madlum","wn":"Madlum River","wd":3.11,"wp":[15.17028,121.0809],"wst":"matched","br":"Masalipit","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.11,"text":"The title names Madlum, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":324},{"i":3621,"cid":"22OD0121","pid":"P00620080LZ","t":"Improvement of Don Pedro Relief Pumping Station, Brgy. Marulas, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":132215551.9,"abc":136586332.6,"fy":"2022","sd":"02/11/2022","cd":"2023-05-06","lat":14.67782,"lon":120.974234,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marulas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2683},{"i":3622,"cid":"24OH0018","pid":"P00820655LZ","t":"Construction of Drainage System (Box Culvert) New Panaderos St. (Lambingan Bridge to Aglipay St.), Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":39199611.71,"abc":39199949.64,"fy":"2024","sd":"02/20/2024","cd":"2024-11-05","lat":14.586724,"lon":121.02015,"sm":null,"fm":null,"tm":null,"am":1369,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":75},{"i":3623,"cid":"21OD0192","pid":"P00525782LZ","t":"Construction of Flood Control Wall  along Bank of Creeks in Barangay 177 (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28680080.5,"abc":29385743.67,"fy":"2021","sd":"03/24/2022","cd":"2023-03-27","lat":14.751041,"lon":121.0526,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"177","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2684},{"i":3624,"cid":"24OH0008","pid":"P00838335LZ","t":"Construction of Slope Protection Structure along Concordia Creek (Sta. 0+833 to Sta. 1+100), Right Bank, Manila City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"AL-AMEN BUILDERS","c":48216273.41,"abc":48249020.17,"fy":"2024","sd":"06/13/2024","cd":"2024-11-12","lat":14.588103,"lon":120.998239,"sm":null,"fm":null,"tm":null,"am":1048,"md":null,"ls":"unknown","ww":"Concordia","wn":"Estero de Concordia","wd":0.01,"wp":[14.58801,120.99827],"wst":"matched","br":null,"len":267.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":76},{"i":3625,"cid":"22CC0272","pid":"P00621573LZ","t":"Construction of Spur Dike along Angat River, Talampas and Sta. Barbara Section, Sta. 00 + 672 - Sta. 01 + 007","w":"Construction of Spur Dike","rg":"Region III","pv":"BULACAN","mu":"CITY OF BALIUAG (BULACAN)","deo":"Bulacan 1st District Engineering Office","co":"A.R.L. CONSTRUCTION","c":96499742.98,"abc":96499750.11,"fy":"2022","sd":"04/04/2022","cd":"2023-02-27","lat":14.93541,"lon":120.96175,"sm":136,"fm":136,"tm":null,"am":60,"md":5.19,"ls":"outside","ww":"Angat","wn":"Angat River","wd":2.05,"wp":[14.95377,120.96408],"wst":"matched","br":null,"len":335.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":50,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.19,"text":"The pin is 5.2 km outside Baliuag, Bulacan, the nearest municipality the record claims. It falls in Angat, Bulacan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":189},{"i":3626,"cid":"24DI0028","pid":"P00820385LZ","t":"Rehabilitation of Revetment along San Isidro River, Barangay Riverside, City of San Pedro, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MICLOVER GENERAL CONSTRUCTION & IRON WORKS","c":14473182.52,"abc":14700000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-08-07","lat":14.3321,"lon":121.029,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":15.91,"wp":[14.47354,121.00247],"wst":"matched","br":"Riverside","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2685},{"i":3627,"cid":"22DQ0024","pid":"P00632882LZ","t":"Construction of Drainage, Barangay G. De Jesus, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":6929636.01,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.32702,"lon":121.02907,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"G. De Jesus","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2686},{"i":3628,"cid":"24OC0045","pid":"P00820577LZ","t":"Rehabilitation of Flood Control Structure, Villanueva Creek Tributary (Lagoon), Barangay B.F. Homes, Parañaque City, Metro Manila","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29391551.65,"abc":29400000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-22","lat":14.453636,"lon":121.010192,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.79,"wp":[14.46825,121.01732],"wst":"matched","br":"B.F. Homes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2687},{"i":3629,"cid":"23OG0039","pid":"P00726031LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase XVI)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:LARSEN-DUTCHER CONSTRACTOR)","c":41285159.32,"abc":42433952.54,"fy":"2023","sd":"02/17/2023","cd":"2023-09-21","lat":14.612747,"lon":121.020283,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.61279,121.02015],"wst":"matched","br":null,"len":null,"ph":"Phase XVI","dup":[],"run":[3170,3637],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OG0038 to 23OG0040) cover the same site, together worth PHP 125,205,799.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":586},{"i":3630,"cid":"22DI0070","pid":"P00620237LZ","t":"Construction of Revetment along Sta.Rosa River at Brgy. Biñan, Biñan City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":96497537.53,"abc":96500000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-06","lat":14.25448,"lon":121.05261,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Sta.Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Biñan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2688},{"i":3631,"cid":"23OC0043","pid":"P00737394LZ","t":"Construction of Drainage System at Elena Street, Barangay San Isidro, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":5046783.6,"abc":5049000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-07-14","lat":14.46987,"lon":121.010398,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3199,3460,3475,3748,3825,3908,3914],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1101},{"i":3632,"cid":"22OB0016","pid":"P00632695LZ","t":"Rehabilitation of Maytunas Creek, Barangay Maytunas, San Juan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAWAO BUILDERS","c":65144336.31,"abc":68599660.55,"fy":"2022","sd":"03/14/2022","cd":"2022-09-12","lat":14.594902,"lon":121.02945,"sm":417,"fm":417,"tm":417,"am":402,"md":0.0,"ls":"inside","ww":"Maytunas","wn":"Maytunas Creek","wd":0.01,"wp":[14.59488,121.02941],"wst":"matched","br":"Maytunas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2689},{"i":3633,"cid":"22OG0134","pid":"P00637005LZ","t":"Rehabilitation of San Juan River (Phase XI), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":18507478.83,"abc":19299714.15,"fy":"2022","sd":"05/19/2022","cd":"2023-03-14","lat":14.614572,"lon":121.02038,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.61453,121.02058],"wst":"matched","br":null,"len":null,"ph":"Phase XI","dup":[3635],"run":[3649,3699,3595,3519],"cl":[],"L":"field","s":42,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 40,315,431.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0132 to 22OG0136) cover the same site, together worth PHP 265,204,819.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":183},{"i":3634,"cid":"22OD0214","pid":"P00632717LZ","t":"Rehabilitation of Casili Creek from Samson Road to Estero de Maypajo, Barangays 34, 36 up to Barangay 75, Caloocan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":28813987.65,"abc":29684232.02,"fy":"2022","sd":"03/22/2022","cd":"2022-12-09","lat":14.635852,"lon":120.974288,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.59,"wp":[14.63728,120.96903],"wst":"matched","br":"34","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2690},{"i":3635,"cid":"22OG0162","pid":"P00621584LZ","t":"Rehabilitation of San Juan River (Phase XIV), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"AARCON BUILDERS","c":21807952.15,"abc":22539862.31,"fy":"2022","sd":"10/14/2022","cd":"2023-09-08","lat":14.614572,"lon":121.02038,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.61453,121.02058],"wst":"matched","br":null,"len":null,"ph":"Phase XIV","dup":[3633],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 40,315,431.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":994},{"i":3636,"cid":"23OD0166","pid":"P00726809LZ","t":"Improvement of Don Pedro Relief Pumping Station (Phase II), Barangay Marulas, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":141709642.4,"abc":144749391.9,"fy":"2023","sd":"04/28/2023","cd":"2024-04-19","lat":14.677431,"lon":120.974383,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marulas","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2691},{"i":3637,"cid":"23OG0040","pid":"P00726032LZ","t":"Rehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase XVII)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ALGIMAR CONSTRUCTION CORPORATION","c":41712122.56,"abc":42433971.39,"fy":"2023","sd":"02/17/2023","cd":"2023-11-13","lat":14.613258,"lon":121.020432,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.61329,121.02031],"wst":"matched","br":null,"len":null,"ph":"Phase XVII","dup":[],"run":[3170,3629],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OG0038 to 23OG0040) cover the same site, together worth PHP 125,205,799.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":587},{"i":3638,"cid":"24OH0007","pid":"P00838334LZ","t":"Construction of Slope Protection Structure along Concordia Creek (Sta. 0+833 to Sta. 1+100), Left Bank, Manila City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":48220023.12,"abc":48249020.17,"fy":"2024","sd":"06/13/2024","cd":"2024-11-12","lat":14.587904,"lon":120.998268,"sm":null,"fm":null,"tm":null,"am":1048,"md":null,"ls":"unknown","ww":"Concordia","wn":"Estero de Concordia","wd":0.01,"wp":[14.588,120.99824],"wst":"matched","br":null,"len":267.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":77},{"i":3639,"cid":"22OD0213","pid":"P00632719LZ","t":"Rehabilitation of Maligaya Creek, Barangay 118 and 120, Caloocan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":38405318.07,"abc":39582905.85,"fy":"2022","sd":"03/22/2022","cd":"2022-11-22","lat":14.635548,"lon":120.974391,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Maligaya","wn":"Maligaya Creek","wd":0.72,"wp":[14.63489,120.98107],"wst":"matched","br":"118","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2692},{"i":3640,"cid":"22OI0051","pid":"P00620761LZ","t":"Construction (Completion) of Flood Control Structure along Laguna Lake, Barangay Alabang, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":92634372.43,"abc":92638315.6,"fy":"2022","sd":"02/17/2022","cd":"2023-01-02","lat":14.426085,"lon":121.053224,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Laguna","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2693},{"i":3641,"cid":"22OG0107","pid":"P00637000LZ","t":"Rehabilitation of San Juan River (Phase VI), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MSB VITUG CONSTRUCTION","c":28931540.41,"abc":28949494.34,"fy":"2022","sd":"05/18/2022","cd":"2023-08-10","lat":14.615012,"lon":121.020442,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61497,121.02067],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[3649],"run":[3689,3462,3505,3451],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 68,070,292.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0107 to 22OG0111) cover the same site, together worth PHP 136,621,674.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":152},{"i":3642,"cid":"22D00101","pid":"P00640465LZ","t":"Construction of Slope Protection Structure along Zapote River, Brgy. Molino 4, Bacoor, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":69296494.5,"abc":69300000.0,"fy":"2022","sd":"06/28/2022","cd":"2023-08-16","lat":14.3763,"lon":121.0106,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.01,"wp":[14.3763,121.01065],"wst":"matched","br":"Molino 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2694},{"i":3643,"cid":"24OF0015","pid":"P00821454LZ","t":"Construction of Flood Control Structure at Culiat Creek, Barangay Sto. Cristo, Quezon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"OSCORD BUILDERS CORPORATION","c":28805612.63,"abc":29399608.72,"fy":"2024","sd":"02/06/2024","cd":"2024-09-02","lat":14.663069,"lon":121.029636,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Culiat","wn":"Culiat Creek","wd":0.01,"wp":[14.66313,121.02959],"wst":"matched","br":"Sto. Cristo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2695},{"i":3644,"cid":"23OD0222","pid":"P00740504LZ","t":"Construction of Drainage System and Sidewalk along Karuhatan Service Road NLEX (Phase II), Brgy. Karuhatan, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":19125110.85,"abc":19595421.06,"fy":"2023","sd":"06/19/2023","cd":"2024-04-12","lat":14.693252,"lon":120.974503,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Karuhatan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2696},{"i":3645,"cid":"23OE0071","pid":"P00726005LZ","t":"Installation of Booster Pump along Estero de Sampaloc (Phase III), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":48999599.71,"abc":48999803.13,"fy":"2023","sd":"02/17/2023","cd":"2023-07-27","lat":14.602391,"lon":120.998445,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc","wn":"Estero de Sampaloc","wd":0.0,"wp":[14.60238,120.99846],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":78},{"i":3646,"cid":"22OI0032","pid":"P00631005LZ","t":"Construction of Flood Control Structure along Bagumbayan Creek (Muntinlupa Side) Brgy. Sucat, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION)","c":48992948.19,"abc":48999647.28,"fy":"2022","sd":"02/09/2022","cd":"2024-04-14","lat":14.467279,"lon":121.053242,"sm":407,"fm":407,"tm":407,"am":1521,"md":0.0,"ls":"inside","ww":"Bagumbayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sucat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2697},{"i":3647,"cid":"21CD0060","pid":"P00526006LZ","t":"Construction of Flood Control Structures along Angat River (Sta. Lucia Section) (Phase 2), Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"Angat","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":48999950.46,"abc":48999908.86,"fy":"2021","sd":"03/08/2021","cd":"2022-09-09","lat":14.937956,"lon":121.029864,"sm":60,"fm":null,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.12,"wp":[14.9371,121.02921],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2698},{"i":3648,"cid":"24OC0012","pid":"P00820563LZ","t":"Construction (Improvement) of Don Galo River from Aldrin going Rodriguez Bridge (Phase 2), Barangay Moonwalk, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":34298335.11,"abc":34300000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-20","lat":14.500013,"lon":121.01061,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":1.24,"wp":[14.49396,121.00096],"wst":"matched","br":"Moonwalk","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2699},{"i":3649,"cid":"22OG0132","pid":"P00621437LZ","t":"Rehabilitation of Flood Control Structure, San Juan River (Phase 6), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":39138751.35,"abc":39199401.97,"fy":"2022","sd":"05/19/2022","cd":"2023-03-14","lat":14.615012,"lon":121.020442,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61497,121.02067],"wst":"matched","br":null,"len":null,"ph":"Phase 6","dup":[3641],"run":[3699,3633,3595,3519],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 68,070,292.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0132 to 22OG0136) cover the same site, together worth PHP 265,204,819.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":130},{"i":3650,"cid":"22OC0050","pid":"P00621418LZ","t":"Construction of Revetment Wall/Sheetpiling of Villanueva Creek (Phase 2), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":46468523.24,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-11-16","lat":14.478644,"lon":120.998662,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.19,"wp":[14.47994,120.9998],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2700},{"i":3651,"cid":"23OE0119","pid":"P00737400LZ","t":"Rehabilitation of Drainage System with Ground Improvement at Barangay 20, Tondo, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JJPR CONSTRUCTION SERVICES","c":19798429.06,"abc":19799884.8,"fy":"2023","sd":"02/14/2023","cd":"2024-09-20","lat":14.598571,"lon":120.961948,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"20","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":79},{"i":3652,"cid":"23PC0038","pid":"P00735962LZ","t":"Construction of Flood Control Structure along Apayao River Basin, Tanglagan Section, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"TAGEL CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/23/2023","cd":"2024-02-07","lat":18.36327,"lon":120.97455,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":0.04,"wp":[18.36293,120.97464],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2701},{"i":3653,"cid":"23OC0089","pid":"P00742114LZ","t":"Construction of Revetment along Paranaque River North (Phase 2), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":98995281.56,"abc":99000000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-04-10","lat":14.522376,"lon":120.998664,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Paranaque","wn":"Parañaque River","wd":0.02,"wp":[14.52237,120.99886],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2702},{"i":3654,"cid":"24CD0171","pid":"P00844753LZ","t":"Construction of Slope Protection Structure, Area C, San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"1199S CONSTRUCTION / C.T. LEONCIO CONSTRUCTION & TRADING","c":48260050.31,"abc":48999949.56,"fy":"2024","sd":"04/30/2024","cd":"2024-08-12","lat":14.865074,"lon":121.053387,"sm":416,"fm":416,"tm":416,"am":1025,"md":0.07,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2703},{"i":3655,"cid":"22OD0057","pid":"P00620403LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 167 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":28474341.53,"abc":29385289.41,"fy":"2022","sd":"02/08/2022","cd":"2022-11-11","lat":14.734749,"lon":121.010646,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"167","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2704},{"i":3656,"cid":"22OI0036","pid":"P00620336LZ","t":"Rehabilitation of Drainage System at Brgy. Almanza 2, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":48998499.24,"abc":48999999.24,"fy":"2022","sd":"02/09/2022","cd":"2022-11-04","lat":14.419495,"lon":121.020458,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Almanza 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2705},{"i":3657,"cid":"24OC0049","pid":"P00823259LZ","t":"Construction of Flood Mitigation Structure along Sapang Buwaya Creek, Brgy. San Antonio, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / P.L.G.L. CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-12-27","lat":14.467726,"lon":121.029908,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":1.97,"wp":[14.46543,121.01181],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2706},{"i":3658,"cid":"22DQ0005","pid":"P00620878LZ","t":"Construction of Revetment along Imus River (Tributary to Manila Bay), Brgy. Fatima, Dasmariñas City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94300703.89,"abc":94305502.49,"fy":"2022","sd":"02/23/2022","cd":"2023-04-18","lat":14.31476,"lon":120.96347,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.31476,120.96349],"wst":"matched","br":"Fatima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2707},{"i":3659,"cid":"22OE0010","pid":"P00620435LZ","t":"Construction of Retention Basin along Estero de Sampaloc (Phase II), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":46796995.89,"abc":48998176.84,"fy":"2022","sd":"02/16/2022","cd":"2023-02-26","lat":14.600516,"lon":120.998752,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc","wn":"Estero de Sampaloc","wd":0.02,"wp":[14.60037,120.99888],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":80},{"i":3660,"cid":"24DE0109","pid":"P00823546LZ","t":"Construction of Seawall at Brgy. Simlong, Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TRISTAN TEJADA CONSTRUCTION (FORMERLY: JOMATRIS CO","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-12-06","lat":13.671475,"lon":121.053488,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Simlong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2708},{"i":3661,"cid":"22D00103","pid":"P00639488LZ","t":"Construction of Slope Protection, Molino 4, Bacoor City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":28946909.86,"abc":28950000.0,"fy":"2022","sd":"10/19/2022","cd":"2023-10-15","lat":14.37462,"lon":121.01067,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2709},{"i":3662,"cid":"23CF0071","pid":"P00742339LZ","t":"Construction of of Drainage Canal, Brgy. Aduas Centro, Cabanatuan City, Nueva Ecija","w":"Construction of Drainage Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"CABANATUAN CITY (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":4890460.8,"abc":4949925.67,"fy":"2023","sd":"03/29/2023","cd":"2023-09-06","lat":15.4931,"lon":120.9643,"sm":272,"fm":272,"tm":272,"am":272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Aduas Centro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2710},{"i":3663,"cid":"22OD0110","pid":"P00632715LZ","t":"Construction of Drainage System and Sidewalk along Karuhatan Service Road NLEX, Barangay Karuhatan, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":9553691.37,"abc":9758644.67,"fy":"2022","sd":"02/08/2022","cd":"2022-10-04","lat":14.693209,"lon":120.974716,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Karuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2711},{"i":3664,"cid":"22OF0072","pid":"P00631037LZ","t":"Construction of Flood Control Structure at Brgy. Baesa, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"MSV CONSTRUCTION AND SUPPLIES","c":14260635.6,"abc":14700000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-21","lat":14.674412,"lon":121.020588,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2712},{"i":3665,"cid":"22CD0102","pid":"P00621077LZ","t":"Construction of Flood Control Structures along Angat River, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / GDL CONSTRUCTION","c":46816820.82,"abc":47529768.97,"fy":"2022","sd":"03/30/2022","cd":"2022-10-14","lat":14.91808,"lon":121.02997,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.91813,121.03022],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2713},{"i":3666,"cid":"21OD0142","pid":"P00525791LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 160, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":9548275.07,"abc":9792054.79,"fy":"2021","sd":"03/24/2022","cd":"2022-08-19","lat":14.6825,"lon":120.99897,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"160","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2714},{"i":3667,"cid":"23OF0001","pid":"P00726017LZ","t":"Construction of Flood Control Structure, Barangay San Agustin, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D","c":19584084.67,"abc":19599857.14,"fy":"2023","sd":"02/13/2023","cd":"2023-10-09","lat":14.731127,"lon":121.03013,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2715},{"i":3668,"cid":"24OB0214","pid":"P00821061LZ","t":"Construction of Slope Protection along Pinagsama River, Taguig City (Phase 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":125754544.8,"abc":135306927.6,"fy":"2024","sd":"05/29/2024","cd":"2025-02-01","lat":14.523448,"lon":121.053744,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Pinagsama","wn":"Pinagsama Creek","wd":0.2,"wp":[14.52276,121.05547],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[3676,3677],"run":[3676,3809],"cl":[],"L":"field","s":62,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 305,219,735.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0214 to 24OB0216) cover the same site, together worth PHP 307,149,717.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":16},{"i":3669,"cid":"23OH0014","pid":"P00726034LZ","t":"Construction of Drainage System (Box Culvert) Medel St. and Vicinity, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"N.M.E. CONSTRUCTION","c":47852928.28,"abc":48999300.2,"fy":"2023","sd":"02/20/2023","cd":"2024-03-15","lat":14.580774,"lon":121.010684,"sm":null,"fm":null,"tm":null,"am":1369,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":81},{"i":3670,"cid":"22OA0063","pid":"P00620012LZ","t":"Closing of Remaining Gaps along Malabon-Tullahan River (Catmon, Tenajeros and PNR Station), Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / CALCON ENGINEERING","c":90686286.95,"abc":92101390.0,"fy":"2022","sd":"02/21/2022","cd":"2023-04-14","lat":14.675446,"lon":120.964338,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2716},{"i":3671,"cid":"24DE0050","pid":"P00823540LZ","t":"Construction of Flood Control Structure at Poblacion, San Pascual, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN PASCUAL (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION","c":14475000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-15","lat":13.78787,"lon":121.02064,"sm":1347,"fm":1347,"tm":1347,"am":1347,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2717},{"i":3672,"cid":"20OI0121","pid":"P00449023LZ","t":"Construction of slope protection at Almirante Creek at Brgy. Talon 4, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"City of Las Piñas","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION","c":29397952.78,"abc":29397952.78,"fy":"2020","sd":"10/16/2020","cd":"2022-07-07","lat":14.429442,"lon":120.999118,"sm":395,"fm":null,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Almirante","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talon 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2718},{"i":3673,"cid":"23OD0070","pid":"P00725543LZ","t":"Construction of Flood Control Structure along the Bankers, Barangay 171, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"FRAMECON BUILDERS","c":85283270.22,"abc":86846459.75,"fy":"2023","sd":"02/21/2023","cd":"2023-10-10","lat":14.768161,"lon":121.030147,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"171","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2719},{"i":3674,"cid":"22PI0043","pid":"P00621011LZ","t":"Construction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.), Sta. 32 + 335 - Sta. 32 + 375 (R.S.) along Talubin River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BONTOC (CAPITAL) (MOUNTAIN PROVINCE)","deo":"Mountain Province 1st District Engineering Office","co":"SADLAN CONSTRUCTION","c":24500000.0,"abc":24499999.2,"fy":"2022","sd":"02/17/2022","cd":"2022-11-18","lat":17.03861,"lon":121.01083,"sm":227,"fm":227,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Talubin","wn":"Talubin River","wd":0.01,"wp":[17.03859,121.01077],"wst":"matched","br":null,"len":220.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2720},{"i":3675,"cid":"22OE0028","pid":"P00631035LZ","t":"Rehabilitation of Drainage System at Zone 1-12, Tondo, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALLEYWAY CONSTRUCTION","c":47478231.14,"abc":48999350.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-19","lat":14.61845,"lon":120.964664,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":82},{"i":3676,"cid":"24OB0215","pid":"P00821062LZ","t":"Construction of Slope Protection along Pinagsama River, Taguig City (Phase 3)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":90685600.66,"abc":96499448.22,"fy":"2024","sd":"05/29/2024","cd":"2025-02-01","lat":14.523448,"lon":121.053744,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Pinagsama","wn":"Pinagsama Creek","wd":0.2,"wp":[14.52276,121.05547],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[3668,3677],"run":[3668,3809],"cl":[],"L":"field","s":58,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 305,219,735.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0214 to 24OB0216) cover the same site, together worth PHP 307,149,717.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":58},{"i":3677,"cid":"24OB0288","pid":"P00821060LZ","t":"Construction of Slope Protection along Pinagsama River, Taguig City (Phase 1)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES","c":88779589.6,"abc":96499553.91,"fy":"2024","sd":"06/04/2024","cd":"2025-02-01","lat":14.523448,"lon":121.053744,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Pinagsama","wn":"Pinagsama Creek","wd":0.2,"wp":[14.52276,121.05547],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[3668,3676],"run":[],"cl":[],"L":"field","s":33,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 305,219,735.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":588},{"i":3678,"cid":"24OE0179","pid":"P00823274LZ","t":"Rehabilitation of Binondo Pumping Station, Manila","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / MNJAP CONSTRUCTION SERVICES","c":143198795.2,"abc":144749640.9,"fy":"2024","sd":"02/20/2024","cd":"2024-09-20","lat":14.596241,"lon":120.974829,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":83},{"i":3679,"cid":"22OC0108","pid":"P00620924LZ","t":"Improvement of Villanueva Creek Tributary (Phase 2) from United Parañaque 5 Junction to Manila Memorial Boundary, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-12-26","lat":14.459032,"lon":121.020871,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.09,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2721},{"i":3680,"cid":"23OF0019","pid":"P00726023LZ","t":"Rehabilitation of Flood Control Structure Along Ilang-Ilang Creek Leading to Tullahan River, Barangay Sta. Monica, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS / MANCOL CONSTRUCTION CORPORATION","c":47990305.2,"abc":48999699.0,"fy":"2023","sd":"02/13/2023","cd":"2023-11-27","lat":14.712647,"lon":121.053946,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Ilang-Ilang","wn":"Ilang-Ilang Creek","wd":4.66,"wp":[14.6852,121.08671],"wst":"matched","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.66,"text":"The title names Ilang-Ilang, which OpenStreetMap maps through the stated municipality, but the pin is 4.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":354},{"i":3681,"cid":"22OD0109","pid":"P00632716LZ","t":"Construction of Drainage System and Sidewalk along Maysan Service Road NLEX, Barangay Maysan, Valenzuela City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":14511642.75,"abc":14838097.44,"fy":"2022","sd":"02/08/2022","cd":"2022-12-03","lat":14.693958,"lon":120.9749,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2722},{"i":3682,"cid":"23P00035","pid":"P00726856LZ","t":"Construction of Flood Control along Tinoc River, Sta. 104 + 400- Sta. 105 + 535 (Danggo Section), Tinoc, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"TINOC (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"PAULA MAE BUHONG CONSTRUCTION / DJY CONSTRUCTION","c":78908050.0,"abc":78902210.58,"fy":"2023","sd":"04/12/2023","cd":"2024-01-07","lat":16.58499,"lon":120.96471,"sm":1571,"fm":1571,"tm":1571,"am":1571,"md":0.0,"ls":"inside","ww":"Tinoc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1135.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2723},{"i":3683,"cid":"24OC0018","pid":"P00838468LZ","t":"Construction of Revetment Wall of Villanueva Creek Tributary from Aguirre to Filipinas Ave., Barangay B.F. Homes, Parañaque City (Phase II)","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29397318.91,"abc":29400000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-07-19","lat":14.45581,"lon":121.010899,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.54,"wp":[14.46825,121.01732],"wst":"matched","br":"B.F. Homes","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2724},{"i":3684,"cid":"22OE0009","pid":"P00620434LZ","t":"Construction of Retention Basin along Estero de Sampaloc (Phase I), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":47470673.29,"abc":48996942.66,"fy":"2022","sd":"02/16/2022","cd":"2023-02-26","lat":14.6007,"lon":120.99914,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc","wn":"Estero de Sampaloc","wd":0.05,"wp":[14.60037,120.99888],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":84},{"i":3685,"cid":"22CD0054","pid":"P00620165LZ","t":"Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":94569849.55,"abc":94569976.6,"fy":"2022","sd":"03/07/2022","cd":"2023-02-10","lat":14.78257,"lon":121.03025,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"San Jose","wn":"San Jose Creek","wd":24.22,"wp":[14.56441,121.04834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2725},{"i":3686,"cid":"23DQ0004","pid":"P00726219LZ","t":"Construction of Revetment (Reinforced Concrete) along Carmona River, Phase 1, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"AARCON BUILDERS","c":44099982.24,"abc":88199984.47,"fy":"2023","sd":"02/16/2023","cd":"2023-09-18","lat":14.30931,"lon":121.05411,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":0.82,"wp":[14.30468,121.06007],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2726},{"i":3687,"cid":"22OE0122","pid":"P00620428LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de Vitas, (RS) Sta. 0+131.00 to Sta. 0+157.04; (RS) Sta. 0+178.00 to Sta. 0+200.00; (LS) Sta. 0+852.10 to Sta. 0+860.00; (RS) Sta. 0+585.20 to Sta. 0+605.10 & (LS) Sta. 0+024.40 to Sta. 0+060.00, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":42723595.09,"abc":44690884.57,"fy":"2022","sd":"02/24/2022","cd":"2022-11-15","lat":14.625626,"lon":120.964857,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.01,"wp":[14.6256,120.96482],"wst":"matched","br":null,"len":111.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":85},{"i":3688,"cid":"22OC0101","pid":"P00620921LZ","t":"Improvement of Don Galo River from Aldrin going Rodriguez Bridge, Brgy. Moonwalk, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":48996514.9,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-01","lat":14.499996,"lon":121.010914,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":1.26,"wp":[14.49396,121.00096],"wst":"matched","br":"Moonwalk","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2727},{"i":3689,"cid":"22OG0108","pid":"P00637001LZ","t":"Rehabilitation of San Juan River (Phase VII), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":28939587.28,"abc":28949335.51,"fy":"2022","sd":"05/18/2022","cd":"2023-10-04","lat":14.614787,"lon":121.020928,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61485,121.02064],"wst":"matched","br":null,"len":null,"ph":"Phase VII","dup":[3699],"run":[3641,3462,3505,3451],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 66,535,394.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0107 to 22OG0111) cover the same site, together worth PHP 136,621,674.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":153},{"i":3690,"cid":"22CD0103","pid":"P00621475LZ","t":"Improvement of Waterways and Flood Control Structures along Angat River, Sta. 11+990 - Sta. 12+340 , Sto. Cristo, Angat, Bulacan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":80794218.29,"abc":82024587.1,"fy":"2022","sd":"03/30/2022","cd":"2022-12-13","lat":14.9215,"lon":121.03026,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.01,"wp":[14.92146,121.03038],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2728},{"i":3691,"cid":"23DI0054","pid":"P00725848LZ","t":"Construction of Structure for Riverbank Protection along Sta. Rosa River, (near South Blvd. Bridge), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96498871.76,"abc":96500000.0,"fy":"2023","sd":"02/24/2023","cd":"2024-01-16","lat":14.25641,"lon":121.05413,"sm":419,"fm":419,"tm":419,"am":371,"md":0.01,"ls":"boundary","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2729},{"i":3692,"cid":"23CD0119","pid":"P00725747LZ","t":"Construction of Poblacion-Macaiban Dike, Santa Maria, Bulacan (Phase I)","w":"Construction of Dike","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":86849185.16,"abc":86849259.29,"fy":"2023","sd":"04/24/2023","cd":"2024-03-31","lat":14.817853,"lon":120.975094,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2730},{"i":3693,"cid":"22OC0149","pid":"P00637006LZ","t":"Construction of Flood Mitigation Structures and Groundsill at Don Galo River - Moonwalk Creek Junction, District 2, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / P.L.G.L. CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-01-17","lat":14.496231,"lon":120.999242,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":0.0,"wp":[14.49626,120.99927],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2731},{"i":3694,"cid":"24P00030","pid":"P00820148LZ","t":"Construction of Danggo Flood Control (Phase II), Danggo, Tinoc, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"TINOC (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"PAULA MAE BUHONG CONSTRUCTION / DJY CONSTRUCTION","c":96500000.0,"abc":96497181.48,"fy":"2024","sd":"03/18/2024","cd":"2024-10-31","lat":16.593837,"lon":120.96542,"sm":1571,"fm":1571,"tm":1571,"am":1571,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2732},{"i":3695,"cid":"22EB0055","pid":"P00632932LZ","t":"Construction of Gabions, Barangay Limlim, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"R.S. TAGALA CONSTRUCTION AND EQUIPMENT RENTALS","c":7794888.79,"abc":7920000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-04-20","lat":12.52913,"lon":121.010925,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Limlim","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2733},{"i":3696,"cid":"22BJ0043","pid":"P00640510LZ","t":"Construction of Cutar Flood Control Structure along Sta. Fe River, Cutar, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48296850.24,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-15","lat":16.28741,"lon":121.03027,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":0.03,"wp":[16.28733,121.0305],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2734},{"i":3697,"cid":"22OE0001","pid":"P00620093LZ","t":"Installation of Automatic Trash Screen & Accessories at Estero de Maypajo, Juan Luna Section, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":54194662.38,"abc":55729550.05,"fy":"2022","sd":"02/17/2022","cd":"2022-10-17","lat":14.635338,"lon":120.975131,"sm":null,"fm":null,"tm":null,"am":308,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.69,"wp":[14.63701,120.96896],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3700],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 150,250,009.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":877},{"i":3698,"cid":"23DI0061","pid":"P00725849LZ","t":"Construction of Structure for Riverbank Protection along Sta. Rosa River, (near Nuvali road), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":93764149.89,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-03-20","lat":14.252865,"lon":121.054262,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2735},{"i":3699,"cid":"22OG0133","pid":"P00621438LZ","t":"Rehabilitation of Flood Control Structure, San Juan River (Phase 7), Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":37595806.22,"abc":39199586.64,"fy":"2022","sd":"05/19/2022","cd":"2023-04-04","lat":14.614787,"lon":121.020928,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.61485,121.02064],"wst":"matched","br":null,"len":null,"ph":"Phase 7","dup":[3689],"run":[3649,3633,3595,3519],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 66,535,394.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (22OG0132 to 22OG0136) cover the same site, together worth PHP 265,204,819.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":131},{"i":3700,"cid":"22OE0020","pid":"P00620091LZ","t":"Installation of Additional Booster Pump including Accessories at Estero de Maypajo, Juan Luna Section, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / A.M. SALONG CONSTRUCTION","c":96055346.98,"abc":96499080.86,"fy":"2022","sd":"02/23/2022","cd":"2022-11-16","lat":14.635338,"lon":120.975131,"sm":null,"fm":null,"tm":null,"am":308,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.69,"wp":[14.63701,120.96896],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3697],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 150,250,009.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":756},{"i":3701,"cid":"23OE0044","pid":"P00726006LZ","t":"Construction of Retention Basin along Estero de Sampaloc, Phase III, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":34782628.8,"abc":34784752.0,"fy":"2023","sd":"02/16/2023","cd":"2023-12-12","lat":14.599734,"lon":120.99926,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Sampaloc","wn":"Estero de Sampaloc","wd":0.01,"wp":[14.59978,120.99934],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":86},{"i":3702,"cid":"22OE0018","pid":"P00620062LZ","t":"Rehabilitation of Lakandula Drainage Main, Tondo, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":69085265.27,"abc":72374986.27,"fy":"2022","sd":"04/01/2022","cd":"2023-12-13","lat":14.606252,"lon":120.965469,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":87},{"i":3703,"cid":"21OF0192","pid":"P00561444LZ","t":"Construction of Flood Control Structures at Barangay Commonwealth, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"PRECIOUS CONSTRUCTION / KING EIGHT BUILDERS AND SUPPLY","c":94973033.0,"abc":98000000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-12-28","lat":14.641289,"lon":121.010928,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Commonwealth","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2736},{"i":3704,"cid":"23OD0005","pid":"P00736167LZ","t":"Construction of Drainage System along St. Francis Ave., Barangay 171, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":20143168.25,"abc":20575261.35,"fy":"2023","sd":"02/21/2023","cd":"2023-11-16","lat":14.77209,"lon":121.03039,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"171","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2737},{"i":3705,"cid":"23OD0201","pid":"P00727015LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 178, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"CALCON ENGINEERING","c":23952759.89,"abc":24495955.56,"fy":"2023","sd":"05/19/2023","cd":"2023-11-27","lat":14.762558,"lon":121.054306,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"178","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2738},{"i":3706,"cid":"24OC0015","pid":"P00838467LZ","t":"Construction of Flood Mitigation Structures at Baloc-Baloc Creek near Multinational Avenue, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-12-15","lat":14.48564,"lon":120.999289,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Baloc-Baloc","wn":"Baloc-Baloc Creek","wd":0.93,"wp":[14.48377,121.00769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2739},{"i":3707,"cid":"24DE0020","pid":"P00823536LZ","t":"Construction of Flood Control Structure along Hagonoy River, San, Pascual, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN PASCUAL (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION","c":28950000.0,"abc":29400000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-02","lat":13.785078,"lon":121.021021,"sm":1347,"fm":1347,"tm":180,"am":1347,"md":0.0,"ls":"inside","ww":"Hagonoy","wn":"Hagonoy River","wd":0.01,"wp":[13.7851,121.02107],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2740},{"i":3708,"cid":"23OD0002","pid":"P00725995LZ","t":"Rehabilitation of Flood Control Wall at Tampoy/F. Bautista, Barangay Marulas, Valenzuela City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"GLOBALCRETE BUILDERS INC.","c":19764178.0,"abc":20229456.94,"fy":"2023","sd":"02/21/2023","cd":"2023-10-18","lat":14.677126,"lon":120.975772,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marulas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2741},{"i":3709,"cid":"21OC0028","pid":"P00525749LZ","t":"Construction of Drainage Main along Chino Roces Avenue from Calatagan Creek towards Buendia Avenue, Makati City, Metro Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":37994635.32,"abc":39954600.0,"fy":"2021","sd":"04/12/2021","cd":"2022-08-22","lat":14.562078,"lon":121.010932,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Calatagan","wn":"Calatagan Creek","wd":0.0,"wp":[14.56209,121.01093],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2742},{"i":3710,"cid":"22BJ0042","pid":"P00620827LZ","t":"Construction of Flood Control along Santa Cruz River, San Fabian Section, Kayapa, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"KAYAPA (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":91506760.15,"abc":91675000.0,"fy":"2022","sd":"03/04/2022","cd":"2022-09-20","lat":16.32696,"lon":120.96602,"sm":706,"fm":706,"tm":706,"am":706,"md":0.0,"ls":"inside","ww":"Santa Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2743},{"i":3711,"cid":"23OB0421","pid":"P00726999LZ","t":"Rehabilitation of Drainage System along F. Manalo Street, San Juan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY / WAWAO BUILDERS","c":41851062.78,"abc":44099966.17,"fy":"2023","sd":"03/22/2023","cd":"2024-09-24","lat":14.59585,"lon":121.0306,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2744},{"i":3712,"cid":"25OE0101","pid":"P00920747LZ","t":"Construction of Flood Mitigation Structure along Estero de Sunog Apog, Barangay 172, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"XIEH CONSTRUCTION","c":14552258.16,"abc":14699517.08,"fy":"2025","sd":"02/11/2025","cd":"2025-04-21","lat":14.6264,"lon":120.96638,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Sunog Apog","wn":"Estero de Sunog Apog","wd":0.01,"wp":[14.62642,120.96632],"wst":"matched","br":"172","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":88},{"i":3713,"cid":"22OG0146","pid":"P00637760LZ","t":"Rehabilitation and Drainage Input of Various Alleys, Central, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":13854876.21,"abc":13859899.85,"fy":"2022","sd":"08/16/2022","cd":"2023-03-17","lat":14.64207,"lon":121.054329,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2745},{"i":3714,"cid":"22OI0067","pid":"P00637037LZ","t":"Construction of Slope Protection at Pasong Baka Creek, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":29354056.65,"abc":29399056.65,"fy":"2022","sd":"04/07/2022","cd":"2022-09-03","lat":14.423249,"lon":120.999683,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Pasong Baka","wn":"Pasong Baka Creek","wd":0.67,"wp":[14.41847,120.99593],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2746},{"i":3715,"cid":"24DQ0025","pid":"P00820356LZ","t":"Construction of Revetment along Zapote River, Phase I, Barangay Molino, Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"R.K.F. BUILDERS / OMNICON BUILDERS","c":113365255.7,"abc":113366253.0,"fy":"2024","sd":"03/08/2024","cd":"2024-12-03","lat":14.41541,"lon":120.97578,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":1.44,"wp":[14.42267,120.98685],"wst":"matched","br":"Molino","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2747},{"i":3716,"cid":"22DQ0067","pid":"P00621296LZ","t":"Construction of Revetment along Imus River, Phase I, Brgy. Tubuan 1, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"SELPHAR CONSTRUCTION / N.B. AVILA CONSTRUCTION","c":96499745.3,"abc":96499969.55,"fy":"2022","sd":"04/13/2022","cd":"2023-01-31","lat":14.21475,"lon":120.9758,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.0,"wp":[14.21475,120.97579],"wst":"matched","br":"Tubuan 1","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2748},{"i":3717,"cid":"22DQ0021","pid":"P00620862LZ","t":"Construction of Flood Control Structure along Imus River, at Brgy. Tubuan, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.","c":78164480.21,"abc":78164983.08,"fy":"2022","sd":"02/23/2022","cd":"2023-11-06","lat":14.21486,"lon":120.97584,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.01,"wp":[14.21485,120.97577],"wst":"matched","br":"Tubuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2749},{"i":3718,"cid":"23CE0061","pid":"P00726924LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Caridad Norte, Llanera, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"LLANERA (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":84040574.73,"abc":85755690.0,"fy":"2023","sd":"03/24/2023","cd":"2023-10-18","lat":15.747825,"lon":121.011281,"sm":800,"fm":800,"tm":800,"am":800,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.01,"wp":[15.74791,121.01124],"wst":"matched","br":"Caridad Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2750},{"i":3719,"cid":"23OE0065","pid":"P00725504LZ","t":"Installation of Booster Pump at Estero de Magdalena (Recto Section) (Phase I), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"AL-AMEN BUILDERS / ST. TIMOTHY CONSTRUCTION CORPORATION","c":84943784.66,"abc":86849820.61,"fy":"2023","sd":"02/17/2023","cd":"2023-07-16","lat":14.605753,"lon":120.975918,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60574,120.97594],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":89},{"i":3720,"cid":"24OC0088","pid":"P00823260LZ","t":"Construction of Flood Mitigation Structure along Sapang Buwaya Creek near Valley 8, Brgy. San Antonio, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"07/08/2024","cd":"2024-12-12","lat":14.47164,"lon":121.030618,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.14,"wp":[14.46543,121.01181],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2751},{"i":3721,"cid":"22OD0152","pid":"P00639411LZ","t":"Construction of Flood Control Wall (Phase 2), Villa Maria, Brgy. 168, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"WAWAO BUILDERS","c":38155429.67,"abc":39198111.93,"fy":"2022","sd":"03/24/2022","cd":"2022-09-15","lat":14.742919,"lon":121.021247,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"168","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2752},{"i":3722,"cid":"22OD0077","pid":"P00632718LZ","t":"Rehabilitation of Drainage System, Barangay 8 and 12, Caloocan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"C.L. MORALES CONSTRUCTION AND TRADING","c":28746683.24,"abc":29394040.47,"fy":"2022","sd":"02/08/2022","cd":"2022-09-05","lat":14.657351,"lon":120.966542,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"8","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2753},{"i":3723,"cid":"22DI0052","pid":"P00620588LZ","t":"Construction of River Protection Structure along Tunasan River, Brgy. Cuyab, San Pedro City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"DATZLAV CONSTRUCTION","c":24468394.71,"abc":24500000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-06","lat":14.3755,"lon":121.05441,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"Tunasan","wn":"Tunasan River","wd":0.01,"wp":[14.37557,121.05433],"wst":"matched","br":"Cuyab","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2754},{"i":3724,"cid":"24CD0029","pid":"P00839581LZ","t":"Construction of Flood Control Structure, Barangay Bahay Pare, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":4949040.88,"abc":4949613.15,"fy":"2024","sd":"02/12/2024","cd":"2024-04-26","lat":14.773023,"lon":121.021304,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bahay Pare","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2755},{"i":3725,"cid":"23OC0020","pid":"P00725977LZ","t":"Rehabilitation of Drainage Structure along Kalayaan Avenue, District I, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AL-REM KONSTRUCT INC.","c":48991852.57,"abc":49000000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-03-07","lat":14.574047,"lon":121.011295,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2756},{"i":3726,"cid":"22OC0052","pid":"P00620026LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Villanueva Creek - Sapang Buwaya Creek Junction, District 1, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":96497599.08,"abc":96500000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-06-16","lat":14.479939,"lon":120.999838,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.0,"wp":[14.47995,120.99983],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2757},{"i":3727,"cid":"24OE0036","pid":"P00823245LZ","t":"Installation of Booster Pump at Estero de Magdalena, Soler Section (Package 2a), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":144748897.0,"abc":144749893.5,"fy":"2024","sd":"02/07/2024","cd":"2024-06-20","lat":14.60423,"lon":120.975955,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60423,120.97595],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3731],"run":[3917,3008,3731],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 217,122,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OE0034 to 24OE0037) cover the same site, together worth PHP 506,589,934.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":39},{"i":3728,"cid":"21BI0052","pid":"P00561680LZ","t":"Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 2, Brgy. Salinas, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"SHANLEY CONSTRUCTION","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-10-12","lat":16.36896,"lon":121.03065,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.07,"wp":[16.36843,121.0303],"wst":"matched","br":"Salinas","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2758},{"i":3729,"cid":"22CD0045","pid":"P00620151LZ","t":"Construction of Flood Control Structure along Maasim River Salapungan Section, Phase II, San Rafael, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN RAFAEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EIRISH BUILDERS & SUPPLY INC.","c":54124446.67,"abc":55004518.97,"fy":"2022","sd":"03/07/2022","cd":"2022-10-05","lat":15.02693,"lon":120.96674,"sm":1352,"fm":1352,"tm":1352,"am":1352,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":3.93,"wp":[15.03715,120.93179],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":3.93,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 3.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":334},{"i":3730,"cid":"24OB0368","pid":"P00845866LZ","t":"Construction of Drainage System, Santa Monica St., Barangay Pineda, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ATLANTA CONSTRUCTION COMPANY, INC.","c":4874733.9,"abc":4949974.58,"fy":"2024","sd":"04/08/2024","cd":"2024-08-25","lat":14.566695,"lon":121.05512,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pineda","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2759},{"i":3731,"cid":"24OE0037","pid":"P00823246LZ","t":"Installation of Booster Pump at Estero de Magdalena, Soler Section (Package 2b), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"AL-AMEN BUILDERS","c":72374032.61,"abc":72374608.94,"fy":"2024","sd":"02/08/2024","cd":"2024-06-20","lat":14.60423,"lon":120.975955,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60423,120.97595],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3727],"run":[3917,3008,3727],"cl":[],"L":"field","s":53,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 217,122,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OE0034 to 24OE0037) cover the same site, together worth PHP 506,589,934.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":84},{"i":3732,"cid":"24DI0061","pid":"P00839630LZ","t":"Construction of Drainage Canal along Laguna Resettlement Community School going to Magsaysay, Barangay United Bayanihan, San Pedro, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MICLOVER GENERAL CONSTRUCTION & IRON WORKS","c":4836385.0,"abc":4950000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-08-20","lat":14.3356,"lon":121.03068,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"United Bayanihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2760},{"i":3733,"cid":"22OD0095","pid":"P00620411LZ","t":"Construction of Retaining Wall at Disiplina Village, Brgy. Ugong, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DJB CONSTRUCTION SERVICES","c":23959118.25,"abc":24498106.74,"fy":"2022","sd":"02/08/2022","cd":"2022-07-25","lat":14.690183,"lon":121.011327,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ugong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2761},{"i":3734,"cid":"22OI0056","pid":"P00620913LZ","t":"Construction of Flood Control Structure, Talon Creek, Las Piñas City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":46574006.57,"abc":48999847.71,"fy":"2022","sd":"02/09/2022","cd":"2022-08-07","lat":14.439452,"lon":120.999853,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":"Talon","wn":"Talon Creek","wd":0.0,"wp":[14.43945,120.99988],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2762},{"i":3735,"cid":"22OD0233","pid":"P00620418LZ","t":"Rehabilitation of Flood Control Wall along the Banks of Creeks, Brgy. 169, Caloocan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":9515920.52,"abc":9799126.34,"fy":"2022","sd":"03/24/2022","cd":"2022-09-12","lat":14.735117,"lon":121.021476,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"169","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2763},{"i":3736,"cid":"23D00100","pid":"P00725853LZ","t":"Construction of Slope Protection at Barangay Narra, San Pedro, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":108079999.1,"abc":108080000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-12-10","lat":14.328719,"lon":121.021592,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Narra","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2764},{"i":3737,"cid":"22OE0031","pid":"P00620438LZ","t":"Rehabilitation of drainage system along Various Major Roads within Zone 13 to Zone 24, Tondo, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":48995670.99,"abc":48999990.14,"fy":"2022","sd":"03/29/2022","cd":"2023-04-06","lat":14.627103,"lon":120.966832,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":90},{"i":3738,"cid":"22CD0152","pid":"P00639482LZ","t":"Construction of Flood Control Structure along Bulo River, Sta. 15+100 - Sta. 15+400, Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48997428.26,"abc":48999753.54,"fy":"2022","sd":"03/30/2022","cd":"2022-12-01","lat":15.22611,"lon":121.00001,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.0,"wp":[15.22614,120.99998],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[3567,2264,3239,3047,2323,3520,3061,3096,3476],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22CD0151 to 22CD0160) cover the same site, together worth PHP 741,709,558.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":526},{"i":3739,"cid":"23CD0060","pid":"P00726520LZ","t":"Construction of Flood Control Structure along Angat River, Matictic Section (Right Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"DEVEX INCORPORATED / N.B. AVILA CONSTRUCTION","c":86849882.04,"abc":86849254.29,"fy":"2023","sd":"02/27/2023","cd":"2023-10-23","lat":14.907434,"lon":121.05523,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.90717,121.05535],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3512,3753],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0059 to 23CD0061) cover the same site, together worth PHP 260,547,956.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":333},{"i":3740,"cid":"22OC0150","pid":"P00621478LZ","t":"Upgrading/ Drainage Improvement of BF Parklane, Parañaque City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"R.E. ORLINA CONSTRUCTION CORPORATION","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-10-17","lat":14.464995,"lon":121.011343,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2765},{"i":3741,"cid":"22OF0153","pid":"P00630924LZ","t":"Rehabilitation of Flood Control of Barangay San Bartolome, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":73386271.5,"abc":75655950.0,"fy":"2022","sd":"03/22/2022","cd":"2023-04-30","lat":14.696663,"lon":121.030763,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Bartolome","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2766},{"i":3742,"cid":"23OE0171","pid":"P00727024LZ","t":"Rehabilitation of Drainage System along Juan Luna St. Tondo, Manila","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":24485983.22,"abc":24499148.16,"fy":"2023","sd":"03/01/2023","cd":"2023-10-19","lat":14.596059,"lon":120.97597,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":91},{"i":3743,"cid":"24OD0089","pid":"P00839526LZ","t":"Rehabilitation of Drainage System, Pangako St., Barangay 151, Caloocan City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":7801091.77,"abc":7919901.57,"fy":"2024","sd":"02/27/2024","cd":"2024-06-24","lat":14.663222,"lon":121.000038,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"151","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2767},{"i":3744,"cid":"22ED0094","pid":"P00639524LZ","t":"Construction of San Teodoro Sea Wall, San Teodoro, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"SAN TEODORO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"KARANGYAN BUILDERS & TRADERS","c":19364691.43,"abc":19600000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-12-12","lat":13.43583,"lon":121.0217,"sm":1360,"fm":1360,"tm":1360,"am":1360,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2768},{"i":3745,"cid":"24CD0078","pid":"P00820183LZ","t":"Construction of Dike along Santo Cristo River, Barangay Kaypian, San Jose del Monte City, Bulacan","w":"Construction of Dike","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":96496378.66,"abc":96499936.84,"fy":"2024","sd":"02/26/2024","cd":"2024-12-17","lat":14.829862,"lon":121.055282,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Santo Cristo","wn":"Santo Cristo Creek","wd":19.43,"wp":[14.65788,121.01883],"wst":"matched","br":"Kaypian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2769},{"i":3746,"cid":"23OE0158","pid":"P00725999LZ","t":"Rehabilitation of Estero de Sunog Apog, (Phase I), Tondo, Manila","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":20983549.7,"abc":21559733.28,"fy":"2023","sd":"02/17/2023","cd":"2023-10-20","lat":14.62811,"lon":120.967009,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Sunog Apog","wn":"Estero de Sunog Apog","wd":0.02,"wp":[14.62801,120.96716],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":92},{"i":3747,"cid":"23CD0018","pid":"P00726730LZ","t":"Construction of Flood Control Structure along Angat River, Santa Lucia, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":33174759.59,"abc":33174624.32,"fy":"2023","sd":"02/22/2023","cd":"2023-08-02","lat":14.939453,"lon":121.030891,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.32,"wp":[14.93716,121.02913],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3885,3189],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0016 to 23CD0018) cover the same site, together worth PHP 138,114,039.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":614},{"i":3748,"cid":"22OC0072","pid":"P00631027LZ","t":"Construction of Box Culvert at Area 7, Brgy. San Isidro, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-11-05","lat":14.462061,"lon":121.011504,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[3168,3195],"cl":[3115,3168,3195,3199,3460,3475,3631,3825,3908,3914],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0072 to 22OC0074) cover the same site, together worth PHP 31,356,792.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":334},{"i":3749,"cid":"21OE0128","pid":"P00561157LZ","t":"Drainage Improvement of Roads within Zone 41 - 57, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":47284638.82,"abc":48999945.63,"fy":"2021","sd":"03/30/2022","cd":"2023-02-24","lat":14.610788,"lon":121.00038,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":93},{"i":3750,"cid":"21BI0051","pid":"P00561679LZ","t":"Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"SHANLEY CONSTRUCTION","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-09-30","lat":16.3676,"lon":121.02175,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.56,"wp":[16.3686,121.02689],"wst":"matched","br":"Salinas","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2770},{"i":3751,"cid":"22OG0041","pid":"P00620447LZ","t":"Rehabilitation of Drainage System, Barangay Malaya, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":9795731.58,"abc":9796132.61,"fy":"2022","sd":"02/18/2022","cd":"2022-07-05","lat":14.63509,"lon":121.055326,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2771},{"i":3752,"cid":"24OD0078","pid":"P00824607LZ","t":"Construction of Reinforced Concrete Box Culvert Along C-3 Road (Dagat-Dagatan Avenue - PNR), Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION / MIGHTY CONSTRUCTION & DEVELOPMENT INC.","c":38259729.8,"abc":39199926.72,"fy":"2024","sd":"02/27/2024","cd":"2024-10-01","lat":14.645069,"lon":120.967798,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2772},{"i":3753,"cid":"23CD0061","pid":"P00726522LZ","t":"Construction of Flood Control Structure along Angat River, Sta. 12+340-Sta. 12+740, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":86848966.84,"abc":86849813.45,"fy":"2023","sd":"02/27/2023","cd":"2023-12-10","lat":14.923828,"lon":121.031077,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.92369,121.03132],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[3512,3739],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0059 to 23CD0061) cover the same site, together worth PHP 260,547,956.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":335},{"i":3754,"cid":"23DI0065","pid":"P00725850LZ","t":"Construction of Structure for Riverbank Protection along Sta. Rosa River, (near SAF), Brgy. Sto. Domingo, Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":93865181.37,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-03-20","lat":14.250183,"lon":121.055487,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2773},{"i":3755,"cid":"23OD0228","pid":"P00725541LZ","t":"Construction of Flood Control Structure along the Banks of Creeks, Barangay 160, Caloocan City (Phase 2)","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY","c":84678409.32,"abc":86849332.6,"fy":"2023","sd":"06/19/2023","cd":"2024-03-21","lat":14.684522,"lon":121.000528,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"160","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2774},{"i":3756,"cid":"24OF0021","pid":"P00820633LZ","t":"Construction of Flood Control Structure at Barangay San Bartolome, Quezon City (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":48508937.83,"abc":48999937.2,"fy":"2024","sd":"02/06/2024","cd":"2024-11-29","lat":14.703899,"lon":121.031271,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Bartolome","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2775},{"i":3757,"cid":"22OC0107","pid":"P00620923LZ","t":"Improvement/Sheetpiling of Villanueva Creek Tributary from Filipinas Ave. to 11th St., Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":48997087.44,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-01","lat":14.464472,"lon":121.01165,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.74,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2776},{"i":3758,"cid":"23OD0080","pid":"P00726803LZ","t":"Construction of Flood Control Wall along Veinte Reales Creek (Phase 3), Veinte Reales, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":72374958.24,"abc":72374437.5,"fy":"2023","sd":"04/20/2023","cd":"2023-12-18","lat":14.717913,"lon":120.968032,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Veinte Reales","wn":"Veinte Reales Creek","wd":0.35,"wp":[14.71594,120.97061],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2777},{"i":3759,"cid":"24OD0033","pid":"P00820594LZ","t":"Construction of Flood Control Wall along Sampaguita Creek, Barangay 171, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"FRAMECON BUILDERS","c":47818676.13,"abc":48995422.57,"fy":"2024","sd":"02/14/2024","cd":"2024-07-02","lat":14.766618,"lon":121.031498,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Sampaguita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"171","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2778},{"i":3760,"cid":"23CD0083","pid":"P00742329LZ","t":"Construction of Flood Control Structure (Slope Protection), Brgy. Bahay Pare, Meycauayan City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":4875393.12,"abc":4949687.94,"fy":"2023","sd":"03/30/2023","cd":"2023-07-18","lat":14.772407,"lon":121.021768,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bahay Pare","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2779},{"i":3761,"cid":"23BC0099","pid":"P00742298LZ","t":"Construction of Union Flood Control along Brgy. Cadcadir River, Claveria in Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"DANDEX CONSTRUCTION","c":9800733.33,"abc":9900000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-07-24","lat":18.55725,"lon":121.05578,"sm":442,"fm":442,"tm":null,"am":442,"md":0.0,"ls":"inside","ww":"Brgy. Cadcadir","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cadcadir River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2780},{"i":3762,"cid":"24OD0053","pid":"P00839524LZ","t":"Construction of Drainage System, Service Road, Ramelon St., Doce St., Barangay 156, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVE-MIRA CONSTRUCTION AND TRADING","c":4874471.73,"abc":4948723.84,"fy":"2024","sd":"02/14/2024","cd":"2024-07-08","lat":14.665791,"lon":121.000535,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"156","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2781},{"i":3763,"cid":"23OC0037","pid":"P00725534LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Villanueva Creek - Tributary Junction Near Agana Circle, District 1, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.)","c":82024950.75,"abc":82025000.0,"fy":"2023","sd":"02/15/2023","cd":"2024-07-03","lat":14.464632,"lon":121.011663,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.73,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2782},{"i":3764,"cid":"22OE0165","pid":"P00621431LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de Magdalena, Sta. 0+000.00 to Sta. 0+76.00 Both Side, Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JIIK CONSTRUCTION SERVICES","c":48999172.37,"abc":48999395.93,"fy":"2022","sd":"06/13/2022","cd":"2022-12-12","lat":14.60582,"lon":120.975973,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60581,120.97599],"wst":"matched","br":null,"len":76.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":94},{"i":3765,"cid":"23OD0071","pid":"P00725558LZ","t":"Construction of Flood Control Wall along the Banks of Matarik Creek, Brgy. 175 (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":89182996.54,"abc":91670816.45,"fy":"2023","sd":"02/21/2023","cd":"2023-12-26","lat":14.774015,"lon":121.031514,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Matarik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"175","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2783},{"i":3766,"cid":"24OD0072","pid":"P00839523LZ","t":"Construction of Box Culvert along 8th Avenue East, Barangay 101, 102, 103, 104, 105, 106, 107, 108 and 109, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC. / NOVA VENTUS CONSTRUCTION INC.","c":33809063.83,"abc":34643636.86,"fy":"2024","sd":"02/27/2024","cd":"2024-09-30","lat":14.648915,"lon":120.975974,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"101","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2784},{"i":3767,"cid":"24CD0167","pid":"P00845987LZ","t":"Construction of Drainage Canal, Brgy. Caysio, Santa Maria, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"PLL BUILDERS INC.","c":4862221.64,"abc":4936172.86,"fy":"2024","sd":"04/25/2024","cd":"2024-08-16","lat":14.842035,"lon":120.968148,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caysio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2785},{"i":3768,"cid":"24OC0038","pid":"P00820054LZ","t":"Construction of Flood Mitigation Structure and Groundsill at Manila Memorial Park, North Side, Phase 1, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU / AKN CONSTRUCTION CORPORATION","c":92609743.96,"abc":92614910.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-16","lat":14.456781,"lon":121.022185,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2786},{"i":3769,"cid":"24DE0108","pid":"P00846037LZ","t":"Rehabilitation of Drainage System, Brgy. 19, Batangas City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"MARTIN BUILDERS INC. (FOR:MARTIN BUILDERS CONSTRUCTION SERVICES)","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"03/20/2024","cd":"2024-06-26","lat":13.753236,"lon":121.055942,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"19","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2787},{"i":3770,"cid":"24OC0032","pid":"P00820569LZ","t":"Construction of Revetment along Villanueva Creek (Near Agana Circle), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"EURO CONSTRUCTION AND SUPPLY ( FORMERLY: EURO CONSTRUCTION AND TRADING)","c":14259747.39,"abc":14700000.0,"fy":"2024","sd":"07/11/2024","cd":"2024-11-15","lat":14.465647,"lon":121.011686,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.67,"wp":[14.46825,121.01732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2788},{"i":3771,"cid":"22DQ0024","pid":"P00632885LZ","t":"Construction of Drainage, Barangay Ramon Cruz, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":4949901.23,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.29138,"lon":121.0006,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ramon Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2789},{"i":3772,"cid":"23DI0083","pid":"P00742435LZ","t":"Rehabilitation of Drainage, Barangay Magsaysay, City of San Pedro, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"EOZ CONSTRUCTION","c":4844096.0,"abc":4950000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-07-24","lat":14.33831,"lon":121.03154,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2790},{"i":3773,"cid":"22DQ0017","pid":"P00620867LZ","t":"Construction of Flood Mitigation Structure along Imus River, at Brgy. Iba, Silang, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.","c":78162955.77,"abc":78164963.54,"fy":"2022","sd":"02/23/2022","cd":"2023-11-06","lat":14.21475,"lon":120.976,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":"Imus","wn":"Imus River","wd":0.02,"wp":[14.21474,120.97579],"wst":"matched","br":"Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2791},{"i":3774,"cid":"23OD0090","pid":"P00726804LZ","t":"Construction of Flood Control Wall along Lingunan Creek, Veinte Reales, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"J. SIMEON CONSTRUCTION / MIGHTY CONSTRUCTION & DEVELOPMENT INC.","c":94316735.57,"abc":96473707.89,"fy":"2023","sd":"04/20/2023","cd":"2024-06-11","lat":14.717713,"lon":120.968288,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Lingunan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2792},{"i":3775,"cid":"23OD0004","pid":"P00736168LZ","t":"Construction of Drainage System along Ilang-Ilang St., Barangay 177, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":23025730.59,"abc":23519641.64,"fy":"2023","sd":"02/21/2023","cd":"2023-06-27","lat":14.745126,"lon":121.056085,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"177","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2793},{"i":3776,"cid":"22OF0053","pid":"P00631041LZ","t":"Construction of Flood Control Structure, Brgy. New Era, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":35972605.19,"abc":37085159.99,"fy":"2022","sd":"02/14/2022","cd":"2022-12-09","lat":14.655591,"lon":121.011722,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Era","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2794},{"i":3777,"cid":"22OC0100","pid":"P00620916LZ","t":"Construction of Revetment Wall/Sheetpiling of Moonwalk Creek from Don Galo River - Moonwalk Creek Junction (Phase II), Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-11-16","lat":14.500596,"lon":121.011871,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Moonwalk","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2795},{"i":3778,"cid":"21OC0042","pid":"P00525759LZ","t":"Rehabilitation of Slope Protection, Baloc Baloc Creek (Phase II), Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"PHILIPPINE CHEMSTEEL INDUSTRIES, INC.","c":29399703.59,"abc":29400000.0,"fy":"2021","sd":"03/22/2022","cd":"2022-10-28","lat":14.485265,"lon":121.000647,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Baloc Baloc","wn":"Baloc-Baloc Creek","wd":0.78,"wp":[14.48377,121.00769],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2796},{"i":3779,"cid":"23OB0311","pid":"P00726787LZ","t":"Rehabilitation of Slope Protection at Maytunas Creek, San Juan City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":40203391.26,"abc":42335591.2,"fy":"2023","sd":"03/22/2023","cd":"2023-09-20","lat":14.59381,"lon":121.0316,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":"Maytunas","wn":"Maytunas Creek","wd":0.0,"wp":[14.5938,121.03159],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2797},{"i":3780,"cid":"22DQ0077","pid":"P00639489LZ","t":"Construction of Drainage, Barangay Adlas, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TCSC CORP.","c":4899930.04,"abc":19599797.32,"fy":"2022","sd":"04/11/2022","cd":"2022-10-17","lat":14.25525,"lon":120.96877,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Adlas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2798},{"i":3781,"cid":"23BC0024","pid":"P00726437LZ","t":"Construction of Flood Control Structure along Guron River, Brgy. Cadcadir, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":48250000.0,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2024-01-18","lat":18.53849,"lon":121.02231,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Guron","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cadcadir","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2799},{"i":3782,"cid":"24BI0049","pid":"P00843258LZ","t":"Construction of Flood Control and Drainage Structure along Matuno River, Barat Section, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":89745000.0,"abc":89745000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-04-15","lat":16.38932,"lon":121.05625,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Matuno","wn":"Matuno River","wd":0.02,"wp":[16.38948,121.05639],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2800},{"i":3783,"cid":"23CF0078","pid":"P00740326LZ","t":"Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sinasajan (Right), Peñaranda, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PEÑARANDA (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"ITP CONSTRUCTION, INC.","c":96498568.59,"abc":96499924.12,"fy":"2023","sd":"04/12/2023","cd":"2023-07-24","lat":15.749447,"lon":121.011884,"sm":1119,"fm":1119,"tm":1119,"am":1307,"md":35.63,"ls":"outside","ww":"Peñaranda","wn":"Peñaranda River","wd":42.11,"wp":[15.36961,120.98938],"wst":"matched","br":"Sinasajan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":81,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":35.63,"text":"The pin is 35.6 km outside Peñaranda, Nueva Ecija, the nearest municipality the record claims. It falls in San Jose City, Nueva Ecija.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.89,"value":42.11,"text":"The title names Peñaranda, which OpenStreetMap maps through the stated municipality, but the pin is 42.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":17},{"i":3784,"cid":"21OH0138","pid":"P00561226LZ","t":"Improvement of Sto Niño Creek, Pasay City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"Pasay City","deo":"South Manila District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":28939547.94,"abc":29699590.39,"fy":"2021","sd":"08/31/2021","cd":"2022-11-19","lat":14.537317,"lon":121.000755,"sm":1107,"fm":null,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":"Sto Niño","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2801},{"i":3785,"cid":"22OD0123","pid":"P00620022LZ","t":"Construction of Flood Control River Wall (Road Dike) along Veinte Reales Creek (Right Side Bank), Brgy. Veinte Reales, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"E.M. CUERPO, INC. / TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":199712253.7,"abc":206535800.6,"fy":"2022","sd":"02/11/2022","cd":"2023-07-03","lat":14.72334,"lon":120.968811,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Veinte Reales","wn":"Veinte Reales Creek","wd":0.84,"wp":[14.71594,120.97061],"wst":"matched","br":"Veinte Reales","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2802},{"i":3786,"cid":"22OE0164","pid":"P00621432LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero do Magdalena, sta. 0+076.00 to Sta. 0+155.20 Both side, Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":48980469.28,"abc":48999789.64,"fy":"2022","sd":"05/20/2022","cd":"2023-06-02","lat":14.606208,"lon":120.976233,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":79.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":95},{"i":3787,"cid":"22OB0156","pid":"P00620085LZ","t":"Construction of Slope Protection along Maricaban Creek, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":59566104.23,"abc":62724722.65,"fy":"2022","sd":"03/21/2022","cd":"2024-03-01","lat":14.530707,"lon":121.022324,"sm":1521,"fm":1521,"tm":1521,"am":398,"md":0.01,"ls":"boundary","ww":"Maricaban","wn":"Maricaban Creek","wd":0.01,"wp":[14.53065,121.02237],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2803},{"i":3788,"cid":"22OA0032","pid":"P00620045LZ","t":"Construction of Riverwall along Malabon-Tullahan River (Phase 2), Brgy. Potrero, Malabon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MALABON CITY","mu":"CITY OF MALABON (METROPOLITAN MANILA)","deo":"Malabon-Navotas District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":67516950.32,"abc":68420449.29,"fy":"2022","sd":"03/24/2022","cd":"2022-12-13","lat":14.674742,"lon":120.976328,"sm":399,"fm":399,"tm":399,"am":399,"md":0.0,"ls":"inside","ww":"Malabon-Tullahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Potrero","len":null,"ph":"Phase 2","dup":[],"run":[3590,3600],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OA0032 to 22OA0034) cover the same site, together worth PHP 165,515,366.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":432},{"i":3789,"cid":"22OD0072","pid":"P00631032LZ","t":"Construction of Flood Control Structure, Brgy. 187, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AYLAN CONSTRUCTION & TRADING","c":19186271.65,"abc":19595683.3,"fy":"2022","sd":"02/08/2022","cd":"2022-12-04","lat":14.76316,"lon":121.056289,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"187","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2804},{"i":3790,"cid":"21OC0036","pid":"P00525752LZ","t":"Construction of Revetment Wall/Sheetpiling of Moonwalk Creek from Don Galo River - Moonwalk Creek Junction to Armstrong Phase 2, Brgy. Moonwalk, Parañaque City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"City of Parañaque","deo":"Metro Manila 2nd District Engineering Office","co":"MACSTRENGTH CONSTRUCTION","c":29399024.81,"abc":29400000.0,"fy":"2021","sd":"05/24/2022","cd":"2023-02-17","lat":14.500834,"lon":121.012055,"sm":411,"fm":null,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Moonwalk","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Moonwalk","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2805},{"i":3791,"cid":"23DQ0007","pid":"P00737512LZ","t":"Construction of Drainage Barangay Ramon Cruz, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":4949968.51,"abc":19799810.39,"fy":"2023","sd":"02/15/2023","cd":"2023-08-17","lat":14.29174,"lon":121.0008,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ramon Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2806},{"i":3792,"cid":"24OB0285","pid":"P00824599LZ","t":"Construction of Slope Protection Structure along M. Tinio Creek/ Western Bicutan Creek, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":13964795.22,"abc":14699764.7,"fy":"2024","sd":"05/06/2024","cd":"2024-11-25","lat":14.519856,"lon":121.031649,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"M. Tinio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2807},{"i":3793,"cid":"23CD0025","pid":"P00726506LZ","t":"Construction of flood control Structure at the Tugatog - Caingin Sections of Meycauayan River","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":68372168.96,"abc":68059587.22,"fy":"2023","sd":"02/22/2023","cd":"2023-10-09","lat":14.725866,"lon":120.968865,"sm":406,"fm":406,"tm":null,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.64,"wp":[14.73117,120.96643],"wst":"matched","br":null,"len":null,"ph":"Section S","dup":[],"run":[3437,3120,2655,2736],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23CD0021 to 23CD0025) cover the same site, together worth PHP 264,356,660.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":433},{"i":3794,"cid":"24BJ0015","pid":"P00820161LZ","t":"Construction of Flood Control along Sta. Fe River, Bone North section, Aritao, Nueva Vizcaya","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / RPP 928 CONSTRUCTION CORPORATION","c":96499614.17,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-29","lat":16.263889,"lon":121.0225,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":0.03,"wp":[16.26378,121.02276],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2808},{"i":3795,"cid":"24DQ0068","pid":"P00823549LZ","t":"Construction of Revetment along Bacoor River, Brgy. Molino IV (Duplex Homes), Bacoor City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":96499777.7,"abc":96499906.44,"fy":"2024","sd":"05/17/2024","cd":"2025-03-10","lat":14.37781,"lon":120.97637,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Bacoor","wn":"Bacoor River","wd":0.01,"wp":[14.37783,120.97629],"wst":"matched","br":"Molino IV","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2809},{"i":3796,"cid":"24BJ0055","pid":"P00843261LZ","t":"Construction of Flood Control Structure along Marang River, Barangay Beti, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"INDUSTRIAL CONTROLS CORPORATION (ICC)","c":129260223.4,"abc":132660000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-08-30","lat":16.2375,"lon":121.056389,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Marang","wn":"Marang River","wd":0.03,"wp":[16.23776,121.05654],"wst":"matched","br":"Beti","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2810},{"i":3797,"cid":"24DE0006","pid":"P00823541LZ","t":"Construction of Flood Control Structure at Cupang to San Teodoro, Bauan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BAUAN (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"REVERE CONSTRUCTION & SUPPLY CORPORATION (FORMERLY","c":24125000.0,"abc":24500000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-29","lat":13.83393,"lon":121.00089,"sm":187,"fm":187,"tm":187,"am":187,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2811},{"i":3798,"cid":"21OF0155","pid":"P00525838LZ","t":"Rehabilitation of Tullahan River and tributaries, Gulod, Novaliches, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":47530000.0,"abc":49000000.0,"fy":"2021","sd":"02/16/2022","cd":"2022-12-12","lat":14.663162,"lon":121.031743,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":3.01,"wp":[14.68241,121.01206],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.01,"text":"The title names Tullahan, which OpenStreetMap maps through the stated municipality, but the pin is 3.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":389},{"i":3799,"cid":"23CD0047","pid":"P00727308LZ","t":"Construction of Flood Control Structure along Meycauayan River and its Tributaries (Caingin-Meyland Section) Sta. 9+350 - Sta. 9+500, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48249000.0,"abc":48999201.06,"fy":"2023","sd":"03/30/2023","cd":"2023-11-16","lat":14.723732,"lon":120.968943,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":0.87,"wp":[14.73117,120.96643],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2812},{"i":3800,"cid":"22CD0178","pid":"P00637774LZ","t":"Construction of Slope Protection at Sitio Sabang (Back of Shell Station), Barangay San Roque, Angat, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"EDCELCON CONSTRUCTION INC.","c":4949420.32,"abc":4899978.54,"fy":"2022","sd":"05/26/2022","cd":"2022-08-14","lat":14.93453,"lon":121.02257,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01009,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":995},{"i":3801,"cid":"24OE0016","pid":"P00820068LZ","t":"Construction of Retarding Basin at Estero de Maypajo (Phase IV), Tondo, Manila City","w":"Construction of Retarding Basin","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":96447990.71,"abc":96497993.95,"fy":"2024","sd":"02/08/2024","cd":"2024-10-07","lat":14.635233,"lon":120.976655,"sm":null,"fm":null,"tm":null,"am":308,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.85,"wp":[14.6373,120.96904],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":96},{"i":3802,"cid":"24OH0021","pid":"P00820657LZ","t":"Construction of Drainage System along R. Delpan St. (Tejeron St. - Havana St.), Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":29394984.53,"abc":29395901.32,"fy":"2024","sd":"02/20/2024","cd":"2024-12-05","lat":14.575011,"lon":121.012164,"sm":null,"fm":null,"tm":null,"am":1369,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":97},{"i":3803,"cid":"22OB0130","pid":"P00631026LZ","t":"Construction of Slope Protection along Bagumbayan River (Phase 1), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":49000000.0,"abc":48999718.68,"fy":"2022","sd":"03/21/2022","cd":"2022-07-27","lat":14.466908,"lon":121.056433,"sm":1521,"fm":1521,"tm":1521,"am":407,"md":0.01,"ls":"boundary","ww":"Bagumbayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2813},{"i":3804,"cid":"24OB0056","pid":"P00821446LZ","t":"Rehabilitation of Barangay Tumana Drainage System, Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":28797915.84,"abc":29399771.25,"fy":"2024","sd":"04/08/2024","cd":"2025-01-17","lat":14.598667,"lon":121.032035,"sm":403,"fm":403,"tm":403,"am":417,"md":5.23,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumana Drainage System","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.23,"text":"The pin is 5.2 km outside City of Marikina, NCR, Second District, the nearest municipality the record claims. It falls in City of San Juan, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":312},{"i":3805,"cid":"21PI0052","pid":"P00526384LZ","t":"Construction of Chaksu Flood Control; Sta. 30 + 580 - Sta. 30 + 840 (L.S.), Sta. 30+880 - Sta. 30+910 along Chico River, Bontoc, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Bontoc","deo":"Mountain Province 1st District Engineering Office","co":"AFEW CONSTRUCTION / E.T. LATAWAN CONSTRUCTION","c":35280000.0,"abc":35279999.7,"fy":"2021","sd":"04/11/2022","cd":"2022-09-15","lat":17.078876,"lon":120.968996,"sm":227,"fm":null,"tm":227,"am":227,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.07893,120.96875],"wst":"matched","br":null,"len":290.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2814},{"i":3806,"cid":"22DI0048","pid":"P00620242LZ","t":"Construction of River Protection Structure along Victoria Ave. Road, Brgy. San Antonio, San Pedro City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / C.S. RAYOS CONSTRUCTION & GENERAL SERVICES, INC.","c":77199699.39,"abc":77200000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-20","lat":14.35716,"lon":121.02299,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2815},{"i":3807,"cid":"22OE0166","pid":"P00621433LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero do Magdalena, sta. 0155.20 to Sta. 0+307.20 Left side Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":48973694.24,"abc":48999376.51,"fy":"2022","sd":"05/23/2022","cd":"2023-03-13","lat":14.606399,"lon":120.976715,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":98},{"i":3808,"cid":"22CE0047","pid":"P00620536LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Tulat, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":48020044.48,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-09-15","lat":15.757261,"lon":121.01217,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.07,"wp":[15.75753,121.01274],"wst":"matched","br":"Tulat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2816},{"i":3809,"cid":"24OB0216","pid":"P00821063LZ","t":"Construction of Slope Protection along Pinagsama River, Taguig City (Phase 4)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":90709571.71,"abc":96499819.92,"fy":"2024","sd":"05/11/2024","cd":"2025-02-01","lat":14.524222,"lon":121.056785,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Pinagsama","wn":"Pinagsama Creek","wd":0.01,"wp":[14.52422,121.05673],"wst":"matched","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[3668,3676],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0214 to 24OB0216) cover the same site, together worth PHP 307,149,717.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":336},{"i":3810,"cid":"22OF0199","pid":"P00640488LZ","t":"Construction of Flood Control Structure at Brgy. Tandang Sora, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"NUEDA BUILDERS CONSTRUCTION & SUPPLY INC.","c":20166300.0,"abc":20790000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-14","lat":14.657175,"lon":121.001031,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2817},{"i":3811,"cid":"22OF0151","pid":"P00632720LZ","t":"Construction of Flood Control Structure, Barangay Sauyo, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":38412000.0,"abc":39600000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-12","lat":14.681971,"lon":121.032222,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sauyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2818},{"i":3812,"cid":"23OE0082","pid":"P00726004LZ","t":"Bank Improvement (steel sheet pile) along Estero de Magdalena, Barangay 266, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":39156110.72,"abc":39199241.47,"fy":"2023","sd":"02/17/2023","cd":"2023-11-23","lat":14.60651,"lon":120.97683,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60651,120.97684],"wst":"matched","br":"266","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":99},{"i":3813,"cid":"24ED0041","pid":"P00823560LZ","t":"Construction/Improvement of Baco Flood Control System, Brgy. Sta. Rosa II, Baco, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BACO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ARCONIC INC.","c":110974891.8,"abc":112700000.0,"fy":"2024","sd":"02/08/2024","cd":"2025-01-08","lat":13.378889,"lon":121.023056,"sm":92,"fm":92,"tm":92,"am":92,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Rosa II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2819},{"i":3814,"cid":"23OH0022","pid":"P00725511LZ","t":"Construction of Drainage System (Box Culvert) along Andrew Avenue from Newport 10th St. to Aurora Blvd. (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":62717241.73,"abc":62724993.26,"fy":"2023","sd":"02/23/2023","cd":"2023-11-21","lat":14.524063,"lon":121.012257,"sm":1107,"fm":1107,"tm":null,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2820},{"i":3815,"cid":"22OE0109","pid":"P00620429LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 151, Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":24491621.21,"abc":24499279.35,"fy":"2022","sd":"02/23/2022","cd":"2022-08-08","lat":14.619692,"lon":120.969278,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.02,"wp":[14.61965,120.96913],"wst":"matched","br":"151","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":100},{"i":3816,"cid":"23OB0067","pid":"P00725952LZ","t":"Construction of Drainage System along East Capitol Drive and Sta. Rosa St., and vicinity Kapitolyo, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":5119086.15,"abc":5389263.26,"fy":"2023","sd":"02/06/2023","cd":"2023-08-06","lat":14.573601,"lon":121.056949,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2821},{"i":3817,"cid":"24OH0064","pid":"P00845880LZ","t":"Improvement of Drainage System along MIA Road (from Domestic Road to Tambo Bridge), Barangay 192 Zone 20 and its vicinity, Pasay City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"SLHAV CONSTRUCTION","c":4809909.62,"abc":4948831.08,"fy":"2024","sd":"04/11/2024","cd":"2024-09-11","lat":14.516909,"lon":121.001039,"sm":1107,"fm":1107,"tm":1107,"am":1107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"192 Zone 20","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2822},{"i":3818,"cid":"24DQ0052","pid":"P00846057LZ","t":"Construction of Flood Control, Tibig, Silang, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"SILANG (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"CMMJ CONSTRUCTION","c":4949659.73,"abc":4949955.4,"fy":"2024","sd":"05/16/2024","cd":"2024-11-11","lat":14.22559,"lon":121.00106,"sm":1455,"fm":1455,"tm":1455,"am":1455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2823},{"i":3819,"cid":"24OB0170","pid":"P00821046LZ","t":"Construction of Slope Protection along C-6 Open Channel (Phase 10), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94521200.8,"abc":96499439.31,"fy":"2024","sd":"02/13/2024","cd":"2024-07-22","lat":14.604276,"lon":121.032265,"sm":1521,"fm":1521,"tm":1521,"am":417,"md":6.97,"ls":"outside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 10","dup":[],"run":[3852,3382],"cl":[],"L":"records","s":68,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.78,"value":6.97,"text":"The pin is 7.0 km outside Taguig City, NCR, Fourth District, the nearest municipality the record claims. It falls in City of San Juan, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0170 to 24OB0172) cover the same site, together worth PHP 283,640,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":54},{"i":3820,"cid":"23OE0031","pid":"P00740297LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase VI, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":70376645.51,"abc":72374173.51,"fy":"2023","sd":"03/28/2023","cd":"2023-06-22","lat":14.600306,"lon":120.97684,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60031,120.97684],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[3833,3838,3844],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 284,262,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":434},{"i":3821,"cid":"24OC0063","pid":"P00823261LZ","t":"Construction of Revetment Wall and Groundsill along Villanueva Creek, Gov. A. Santos Section, Brgy. BF Homes, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":144749717.8,"abc":144750000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-12-12","lat":14.45109,"lon":121.012319,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":1.97,"wp":[14.46825,121.01732],"wst":"matched","br":"BF Homes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2824},{"i":3822,"cid":"22PA0050","pid":"P00632764LZ","t":"Construction of Duldulao Flood Control Structure, Barangay Duldulao, Malibcong, Abra","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"ABRA","mu":"MALIBCONG (ABRA)","deo":"Abra District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49497162.42,"abc":48999950.01,"fy":"2022","sd":"03/01/2022","cd":"2022-10-27","lat":17.61278,"lon":121.023242,"sm":894,"fm":894,"tm":894,"am":894,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Duldulao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01015,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":757},{"i":3823,"cid":"23OC0099","pid":"P00742111LZ","t":"Construction of Slope Protection and Groundsill Structure along Villanueva Creek near Schilling Lane, Brgy. San Dionisio, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":96129000.0,"abc":99000000.0,"fy":"2023","sd":"07/10/2023","cd":"2024-12-16","lat":14.475905,"lon":121.001328,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.24,"wp":[14.47797,121.00205],"wst":"matched","br":"San Dionisio","len":null,"ph":null,"dup":[3825],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,128,627.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":758},{"i":3824,"cid":"22OC0174","pid":"P00639408LZ","t":"Rehabilitation and Drainage Improvement along Nigeria St. and its Vicinity, Brgy. Don Bosco, Parañaque City, Metro Manila","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"GRAC-TA BUILDERS","c":14698821.77,"abc":14700000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-06","lat":14.484094,"lon":121.032331,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Don Bosco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2825},{"i":3825,"cid":"23OC0081","pid":"P00727010LZ","t":"Construction of Revetment near Salvador Bridge (Downstream Side), Barangay San Isidro, Parañaque City, Metro Manila","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":48999627.3,"abc":49000000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-04-12","lat":14.475903,"lon":121.00133,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[3823],"run":[],"cl":[3115,3168,3195,3199,3460,3475,3631,3748,3908,3914],"L":"field","s":40,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,128,627.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":282},{"i":3826,"cid":"23DE0063","pid":"P00740395LZ","t":"Construction of Flood Control Structure, Brgy. Sta. Maria, Bauan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BAUAN (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION","c":19300000.0,"abc":19600000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-08-15","lat":13.776297,"lon":120.969387,"sm":187,"fm":187,"tm":187,"am":187,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2826},{"i":3827,"cid":"21OF0156","pid":"P00525839LZ","t":"Rehabilitation of Tullahan River and tributaries, Fairview, Novaliches, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":47530000.0,"abc":49000000.0,"fy":"2021","sd":"02/16/2022","cd":"2023-02-10","lat":14.645702,"lon":121.012332,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Tullahan","wn":"Tullahan River","wd":3.66,"wp":[14.67065,120.99],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.66,"text":"The title names Tullahan, which OpenStreetMap maps through the stated municipality, but the pin is 3.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":380},{"i":3828,"cid":"24OE0176","pid":"P00845869LZ","t":"Construction of Drainage System, Zone 58-62, Manila City (Phase III)","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / G2XD CONSTRUCTION SERVICES","c":98959761.62,"abc":98999341.6,"fy":"2024","sd":"02/20/2024","cd":"2024-09-20","lat":14.594078,"lon":121.023359,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":101},{"i":3829,"cid":"24CD0113","pid":"P00823481LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Matictic (Left Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":43424482.39,"abc":43424897.13,"fy":"2024","sd":"03/18/2024","cd":"2024-10-06","lat":14.9082,"lon":121.056977,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.04,"wp":[14.90786,121.0571],"wst":"matched","br":"Matictic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2827},{"i":3830,"cid":"23DQ0007","pid":"P00737511LZ","t":"Construction of Drainage Barangay Francisco Reyes, General Mariano Alvarez, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"GEN. MARIANO ALVAREZ (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":4949879.02,"abc":19799810.39,"fy":"2023","sd":"02/15/2023","cd":"2023-08-17","lat":14.32929,"lon":121.03237,"sm":570,"fm":570,"tm":570,"am":570,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Francisco Reyes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2828},{"i":3831,"cid":"21OE0019","pid":"P00525827LZ","t":"Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 948 and Chainage 435.20 to Chainage 634.60, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.)","c":47155728.25,"abc":48999905.97,"fy":"2021","sd":"07/15/2021","cd":"2022-10-27","lat":14.614582,"lon":121.001366,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":102},{"i":3832,"cid":"23ED0093","pid":"P00742456LZ","t":"Construction of Drainange Canal at Sabang, Puerto Galera, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PUERTO GALERA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SANLAHI GROUP OF BUILDERS INC.","c":4839339.24,"abc":4950000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-09-06","lat":13.525,"lon":120.9694,"sm":1179,"fm":1179,"tm":1179,"am":1179,"md":0.0,"ls":"inside","ww":"Drainange","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2829},{"i":3833,"cid":"23OE0039","pid":"P00740293LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase III, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":72216269.62,"abc":72374960.34,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.600306,"lon":120.97684,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60031,120.97684],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[3820,3838,3844],"run":[3324,3329],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 284,262,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OE0037 to 23OE0039) cover the same site, together worth PHP 264,826,177.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":40},{"i":3834,"cid":"24OH0013","pid":"P00820664LZ","t":"Construction of Slope Protection Structure, Maricaban Creek, Sta. 1 +170 to Sta.1 + 404, Pasay City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASAY CITY","mu":"PASAY CITY (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"CAANA CONSTRUCTION CORPORATION","c":48982729.87,"abc":49016204.84,"fy":"2024","sd":"02/20/2024","cd":"2024-06-03","lat":14.530916,"lon":121.012336,"sm":1107,"fm":1107,"tm":1107,"am":398,"md":0.01,"ls":"boundary","ww":"Maricaban","wn":"Maricaban Creek","wd":0.0,"wp":[14.53092,121.01234],"wst":"matched","br":null,"len":234.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2830},{"i":3835,"cid":"24DI0004","pid":"P00820884LZ","t":"Construction of Flood Protection Structure Phase 3, (Biñan-Sta. Rosa Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":48997686.53,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-09-29","lat":14.2606,"lon":121.057,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2831},{"i":3836,"cid":"21OD0181","pid":"P00525790LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 166, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":47822230.74,"abc":48998204.76,"fy":"2021","sd":"03/24/2022","cd":"2022-12-12","lat":14.734161,"lon":121.001604,"sm":308,"fm":null,"tm":308,"am":436,"md":0.24,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"166","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2832},{"i":3837,"cid":"23CD0105","pid":"P00742332LZ","t":"Construction of Drainage Canal, Brgy. Caysio, Sta. Maria, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"SANTA MARIA (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"PLL BUILDERS INC.","c":4941438.89,"abc":4944191.57,"fy":"2023","sd":"03/30/2023","cd":"2023-09-02","lat":14.84861,"lon":120.9698,"sm":1395,"fm":1395,"tm":1395,"am":1395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caysio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2833},{"i":3838,"cid":"23OE0068","pid":"P00740294LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase IV, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / A.M. SALONG CONSTRUCTION","c":71220223.38,"abc":72374619.81,"fy":"2023","sd":"03/28/2023","cd":"2023-06-23","lat":14.600306,"lon":120.97684,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60031,120.97684],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[3820,3833,3844],"run":[3844,3896,3979,3902],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 284,262,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OE0068 to 23OE0073) cover the same site, together worth PHP 286,156,184.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":41},{"i":3839,"cid":"24CD0013","pid":"P00821579LZ","t":"Construction of Flood Control Structure along Angat River, Barangay San Roque, Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":48249988.32,"abc":48249312.8,"fy":"2024","sd":"04/08/2024","cd":"2024-11-02","lat":14.933534,"lon":121.032595,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.03,"wp":[14.93379,121.0326],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2834},{"i":3840,"cid":"23OC0095","pid":"P00727012LZ","t":"Installation of Booster Pump and Ground Sill, Phase 2, Sapang Buwaya Creek - Tributary Junction Near Jestra Villas, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":19110512.21,"abc":19600000.0,"fy":"2023","sd":"05/16/2023","cd":"2024-04-26","lat":14.472601,"lon":121.023441,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":1.48,"wp":[14.46543,121.01181],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2835},{"i":3841,"cid":"23OD0003","pid":"P00736164LZ","t":"Construction of Flood Control Wall along Bank of Creek in Barangay 163, (Phase 3), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"WAWAO BUILDERS","c":28516336.77,"abc":29398295.98,"fy":"2023","sd":"02/21/2023","cd":"2023-12-16","lat":14.682543,"lon":121.012339,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"163","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2836},{"i":3842,"cid":"24OD0017","pid":"P00820591LZ","t":"Construction of Flood Control Wall along Bagong Nayon, Barangay Bagbaguin, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"GILTOP CIVIL ENGINEERING CONSTRUCTION","c":9629462.08,"abc":9796010.08,"fy":"2024","sd":"02/14/2024","cd":"2024-07-12","lat":14.727802,"lon":121.001831,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagbaguin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2837},{"i":3843,"cid":"24CD0133","pid":"P00824699LZ","t":"Construction of Flood Control Structure along Meycauayan River and its Tributaries (Caingin-Meyland Section), Sta. 9+500 - Sta. 9+850, Meycauayan City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF MEYCAUAYAN (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48999993.98,"abc":48999785.66,"fy":"2024","sd":"03/25/2024","cd":"2024-09-17","lat":14.722308,"lon":120.969836,"sm":406,"fm":406,"tm":406,"am":406,"md":0.0,"ls":"inside","ww":"Meycauayan","wn":"Meycauayan River","wd":1.05,"wp":[14.73117,120.96643],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2838},{"i":3844,"cid":"23OE0069","pid":"P00740296LZ","t":"Installation of Booster Pump at Estero dela Reina, Phase V, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / GOLDEN J'S CONSTRUCTION SERVICES","c":70449787.58,"abc":72374961.18,"fy":"2023","sd":"03/28/2023","cd":"2023-06-22","lat":14.600306,"lon":120.97684,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60031,120.97684],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[3820,3833,3838],"run":[3838,3896,3979,3902],"cl":[],"L":"field","s":59,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 284,262,926.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OE0068 to 23OE0073) cover the same site, together worth PHP 286,156,184.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":42},{"i":3845,"cid":"24OG0100","pid":"P00845878LZ","t":"Construction of River Capacity Enhancement Structure along Lagarian Creek, Quezon City (Phase V)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":49498395.28,"abc":49499926.25,"fy":"2024","sd":"03/26/2024","cd":"2024-12-20","lat":14.6261,"lon":121.0334,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.0,"wp":[14.62612,121.0334],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2839},{"i":3846,"cid":"24DC0030","pid":"P00839098LZ","t":"Construction of Line Canal, Zone 1, Talisay, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TALISAY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"OIC CONZTRUCT AND SUPPLY CORPORATION(FORMERLY:OIC CONST.)","c":4949056.8,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-06-13","lat":14.094903,"lon":121.023493,"sm":1530,"fm":1530,"tm":1530,"am":1530,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2840},{"i":3847,"cid":"24OH0058","pid":"P00820660LZ","t":"Construction of Drainage System, Revillen St. and Vicinity (J. Syquia St. to Tejeron St.), Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"SLHAV CONSTRUCTION","c":28936681.15,"abc":29399909.09,"fy":"2024","sd":"03/19/2024","cd":"2024-06-14","lat":14.579184,"lon":121.012351,"sm":null,"fm":null,"tm":null,"am":1369,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":103},{"i":3848,"cid":"22OB0097","pid":"P00620030LZ","t":"Construction of Pumping Station and Flood Control Structure at Bagumbayan River Including Upgrading of Drainage Outfall / Laterals, Brgy. Bagumbayan, Taguig City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / TWENTYSIX CONSTRUCTION INC.","c":96500000.0,"abc":96499593.17,"fy":"2022","sd":"03/21/2022","cd":"2023-03-06","lat":14.466779,"lon":121.057183,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Bagumbayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2841},{"i":3849,"cid":"22D00102","pid":"P00639487LZ","t":"Construction of Slope Protection, Springville Heights, Molino 7, Bacoor City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"E. F. CHUA CONSTRUCTION, INC.","c":19298004.01,"abc":19300000.0,"fy":"2022","sd":"10/19/2022","cd":"2023-04-16","lat":14.39477,"lon":121.00199,"sm":98,"fm":98,"tm":98,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2842},{"i":3850,"cid":"22OD0122","pid":"P00620029LZ","t":"Construction of Pumping Station along Veinte Reales, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC. / AKN CONSTRUCTION CORPORATION","c":234010231.7,"abc":241247714.4,"fy":"2022","sd":"02/11/2022","cd":"2024-02-19","lat":14.721759,"lon":120.969853,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2843},{"i":3851,"cid":"22OI0135","pid":"P00631009LZ","t":"Rehabilitation of Road and Drainage System, Barangay Pamplona 1, Las Piñas City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"LAS PIÑAS CITY","mu":"CITY OF LAS PIÑAS (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"KPSL GENERAL CONTRACTOR INC.","c":19594904.1,"abc":19599920.44,"fy":"2022","sd":"06/13/2022","cd":"2023-08-22","lat":14.460829,"lon":120.976845,"sm":395,"fm":395,"tm":395,"am":395,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pamplona 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2844},{"i":3852,"cid":"24OB0171","pid":"P00821047LZ","t":"Construction of Slope Protection along C-6 Open Channel (Phase 11), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":94569472.4,"abc":96499461.64,"fy":"2024","sd":"02/13/2024","cd":"2024-07-22","lat":14.577352,"lon":121.033406,"sm":1521,"fm":1521,"tm":1521,"am":402,"md":4.07,"ls":"outside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 11","dup":[],"run":[3819,3382],"cl":[],"L":"records","s":66,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.7,"value":4.07,"text":"The pin is 4.1 km outside Taguig City, NCR, Fourth District, the nearest municipality the record claims. It falls in City of Mandaluyong, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0170 to 24OB0172) cover the same site, together worth PHP 283,640,855.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":61},{"i":3853,"cid":"23OC0008","pid":"P00725525LZ","t":"Construction of Revetment Wall along Bangkal Creek, Barangay Bangkal, Makati City (Phase II)","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION","c":73738662.22,"abc":73753020.0,"fy":"2023","sd":"03/09/2023","cd":"2024-01-02","lat":14.544216,"lon":121.012633,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Bangkal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bangkal","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2845},{"i":3854,"cid":"23DE0095","pid":"P00742180LZ","t":"Construction of Drainage along Batangas Port Diversion Rd, Batangas","w":"Upgrading of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"DL ENTERPRISES / MARTIN BUILDERS INC. (FOR:MARTIN BUILDERS CONSTRUCTION SERVICES)","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-11-29","lat":13.78333,"lon":121.05722,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2846},{"i":3855,"cid":"24DC0022","pid":"P00839607LZ","t":"Construction of Flood Mitigation Structure (Riprap), Barangay Banga, Talisay, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TALISAY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"KEASCIA CONSTRUCTION & SUPPLY","c":4949278.2,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-13","lat":14.0924,"lon":121.0129,"sm":1530,"fm":1530,"tm":1530,"am":1530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2847},{"i":3856,"cid":"22OE0146","pid":"P00620064LZ","t":"Construction of Automatic Trash Screen Rake including accessories and platform along Estero de Valencia, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":72374100.88,"abc":72374894.32,"fy":"2022","sd":"04/01/2022","cd":"2022-11-18","lat":14.603226,"lon":121.002056,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.60322,121.00199],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":104},{"i":3857,"cid":"24DQ0061","pid":"P00846056LZ","t":"Construction of revetment along Zapote River, Barangay Zapote 3 (Formerly Zapote 5), City of Bacoor, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":15344921.42,"abc":15344985.9,"fy":"2024","sd":"05/15/2024","cd":"2024-12-09","lat":14.47314,"lon":120.96986,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":"Zapote","wn":"Zapote River","wd":0.11,"wp":[14.47364,120.9707],"wst":"matched","br":"Zapote 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2848},{"i":3858,"cid":"24OF0059","pid":"P00844688LZ","t":"Construction of Drainage Systems at Gulod and Various Connecting Roads and Drainages, Brgy. Sauyo, District VI, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"TOUGHBILT CONSTRUCTION & TRADING, INC.","c":14545505.14,"abc":14699856.72,"fy":"2024","sd":"04/01/2024","cd":"2024-07-15","lat":14.68924,"lon":121.033561,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sauyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2849},{"i":3859,"cid":"24OE0124","pid":"P00820616LZ","t":"Construction of Drainage along Leyte St., Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":9703253.01,"abc":9799829.81,"fy":"2024","sd":"02/12/2024","cd":"2024-06-10","lat":14.594632,"lon":121.023632,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":105},{"i":3860,"cid":"24DQ0035","pid":"P00825113LZ","t":"Construction of Revetment along Carmona River, Brgy. Cabilang Baybay, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":125449943.3,"abc":125449966.1,"fy":"2024","sd":"02/14/2024","cd":"2024-12-06","lat":14.32354,"lon":121.05734,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.27,"wp":[14.31833,121.0678],"wst":"matched","br":"Cabilang Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2850},{"i":3861,"cid":"24OE0004","pid":"P00820086LZ","t":"Installation of Booster Pump at Estero de Maypajo (PNR Section) (Package 1a), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":142133628.7,"abc":144749909.1,"fy":"2024","sd":"02/08/2024","cd":"2024-07-06","lat":14.63517,"lon":120.976907,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.88,"wp":[14.6373,120.96904],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3869],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 283,849,348.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":685},{"i":3862,"cid":"23OC0094","pid":"P00742240LZ","t":"Rehabilitation of Flood Control Structure, Villanueva Creek Tributary Lagoon, Brgy. BF Homes, Parañaque City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"P.L.G.L. CONSTRUCTION","c":19791672.85,"abc":19800000.0,"fy":"2023","sd":"05/16/2023","cd":"2023-10-24","lat":14.449133,"lon":121.013049,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":2.16,"wp":[14.46825,121.01732],"wst":"matched","br":"BF Homes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2851},{"i":3863,"cid":"24C00521","pid":"P00845807LZ","t":"Construction of Flood Control Structure along Maasim River, Upig Section, Brgy. Upig, San Ildefonso, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN ILDEFONSO (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98998363.35,"abc":98998746.22,"fy":"2024","sd":"05/06/2024","cd":"2025-01-13","lat":15.0227,"lon":120.9702,"sm":1284,"fm":1284,"tm":1284,"am":1284,"md":0.0,"ls":"inside","ww":"Maasim","wn":"Maasim River","wd":4.43,"wp":[15.03715,120.93179],"wst":"matched","br":"Upig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.57,"value":4.43,"text":"The title names Maasim, which OpenStreetMap maps through the stated municipality, but the pin is 4.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":271},{"i":3864,"cid":"24OF0003","pid":"P00820641LZ","t":"Rehabilitation of Flood Control Structure at St. James, Barangay Nagkaisang Nayon, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"FRAMECON BUILDERS","c":29399739.03,"abc":29399900.0,"fy":"2024","sd":"02/06/2024","cd":"2024-10-28","lat":14.710557,"lon":121.033565,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nagkaisang Nayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2852},{"i":3865,"cid":"22OD0179","pid":"P00637047LZ","t":"Construction of Relief Pumping Station at Mayers Creek, Brgy, Lingunan, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"MIGHTY CONSTRUCTION & DEVELOPMENT INC.","c":23689711.72,"abc":24484572.72,"fy":"2022","sd":"03/24/2022","cd":"2023-02-15","lat":14.720543,"lon":120.970219,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Mayers","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2853},{"i":3866,"cid":"24OE0057","pid":"P00820013LZ","t":"Construction of Drainage along Pat Antonio St., Manila City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":65235972.08,"abc":67549571.19,"fy":"2024","sd":"02/14/2024","cd":"2024-12-10","lat":14.59819,"lon":121.02396,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":106},{"i":3867,"cid":"22CD0213","pid":"P00637072LZ","t":"Construction of Slope Protection Structure, Phase 3B - Carissa 3-A, Brgy. Kaypian, City of San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48997036.71,"abc":48999233.8,"fy":"2022","sd":"05/26/2022","cd":"2023-01-02","lat":14.82912,"lon":121.05749,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaypian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2854},{"i":3868,"cid":"22OD0071","pid":"P00620400LZ","t":"Construction of Flood Control Wall along the Banks of Creeks Lucas Cuadra, Brgy. 163, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28871376.46,"abc":29399643.45,"fy":"2022","sd":"02/08/2022","cd":"2022-12-12","lat":14.684167,"lon":121.013264,"sm":308,"fm":308,"tm":308,"am":436,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"163","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2855},{"i":3869,"cid":"24OE0033","pid":"P00823247LZ","t":"Installation of Booster Pump at Estero de Maypajo, PNR Section (Package 1b), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JIIK CONSTRUCTION SERVICES","c":141715719.7,"abc":144749278.6,"fy":"2024","sd":"02/13/2024","cd":"2024-07-11","lat":14.63517,"lon":120.976907,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Maypajo","wn":"Estero de Maypajo","wd":0.88,"wp":[14.6373,120.96904],"wst":"matched","br":null,"len":null,"ph":null,"dup":[3861],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 283,849,348.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":686},{"i":3870,"cid":"22OE0016","pid":"P00620063LZ","t":"Construction of Additional Booster Pump along Estero de Valencia, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / CALCON ENGINEERING","c":72374113.53,"abc":72374442.98,"fy":"2022","sd":"04/01/2022","cd":"2023-08-29","lat":14.603156,"lon":121.00206,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.60315,121.00199],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":107},{"i":3871,"cid":"22CD0056","pid":"P00620161LZ","t":"Construction of Flood Control Structure, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Ilog Bayan River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94569655.86,"abc":94569044.49,"fy":"2022","sd":"03/07/2022","cd":"2022-11-23","lat":14.82096,"lon":121.03379,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2856},{"i":3872,"cid":"22OD0075","pid":"P00620393LZ","t":"Construction of Flood Control Wall along I. Francisco Creek, Brgy. Maysan, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":14370183.34,"abc":14693446.94,"fy":"2022","sd":"02/08/2022","cd":"2022-10-04","lat":14.697541,"lon":120.970228,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"I. Francisco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2857},{"i":3873,"cid":"23OB0116","pid":"P00725521LZ","t":"Construction of Flood Control Structure (Pumping Station) at Bagumbayan River including Upgrading of Drainage Outfall/Laterals (Phase 2), Barangay Bagumbayan, Taguig City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"FRANZCOR TRADING & CONSTRUCTION","c":88875980.92,"abc":91674760.54,"fy":"2023","sd":"10/09/2023","cd":"2024-06-04","lat":14.466598,"lon":121.057793,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.02,"ls":"boundary","ww":"Bagumbayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2858},{"i":3874,"cid":"23OF0165","pid":"P00742246LZ","t":"Construction of Flood Control Structure along San Francisco River in Brgy. San Antonio, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":9800999.99,"abc":9899999.99,"fy":"2023","sd":"10/18/2023","cd":"2024-01-18","lat":14.6495,"lon":121.013306,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.01,"wp":[14.64954,121.01327],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2859},{"i":3875,"cid":"23OH0050","pid":"P00726793LZ","t":"Improvement of Harbor View Pumping Station, South Dr. Ermita, Manila City Phase I","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ALRIE CONSTRUCTION SERVICES","c":96495753.94,"abc":96499994.7,"fy":"2023","sd":"04/24/2023","cd":"2023-12-04","lat":14.579864,"lon":120.977052,"sm":null,"fm":null,"tm":null,"am":550,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[3881],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,991,587.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":759},{"i":3876,"cid":"18EB0118","pid":"P00223374LZ","t":"Construction of Anahawin River Flood Control Structures, Phase 2, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Calintaan","deo":"Mindoro Occidental District Engineering Office","co":"FFJJ CONSTRUCTION","c":24646157.14,"abc":25646600.0,"fy":"2018","sd":"04/20/2018","cd":"2023-03-27","lat":12.63115,"lon":121.013306,"sm":307,"fm":null,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Anahawin","wn":"Anahawin River","wd":0.06,"wp":[12.63086,121.01372],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2860},{"i":3877,"cid":"22OD0178","pid":"P00639412LZ","t":"Construction of Pumping Station at Mayers Creek, Valenzuela City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":13274738.88,"abc":13708287.93,"fy":"2022","sd":"03/24/2022","cd":"2022-12-16","lat":14.720346,"lon":120.970313,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Mayers","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2861},{"i":3878,"cid":"23OD0106","pid":"P00725556LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 171 Phase 2, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":90070431.63,"abc":91669611.62,"fy":"2023","sd":"03/17/2023","cd":"2023-11-24","lat":14.773073,"lon":121.03384,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"171 Phase 2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2862},{"i":3879,"cid":"23OC0062","pid":"P00725536LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Don Galo River Near Multinational Avenue, District 2, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":93946610.0,"abc":93946803.0,"fy":"2023","sd":"02/14/2023","cd":"2024-07-15","lat":14.494381,"lon":121.002061,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo River","wd":0.13,"wp":[14.49396,121.00096],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2863},{"i":3880,"cid":"22OI0071","pid":"P00620909LZ","t":"Construction of Flood Control Structure, Magdaong River, Barangay Poblacion, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"CITY OF MUNTINLUPA (METROPOLITAN MANILA)","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"AARCON BUILDERS","c":48994772.98,"abc":48999999.54,"fy":"2022","sd":"03/11/2022","cd":"2023-09-20","lat":14.377988,"lon":121.024208,"sm":407,"fm":407,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Magdaong","wn":"Magdaong Creek","wd":0.86,"wp":[14.37908,121.03208],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2864},{"i":3881,"cid":"23OH0051","pid":"P00726794LZ","t":"Improvement of Harbor View Pumping Station, South Dr. Ermita, Manila City Phase II","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":96495833.14,"abc":96499987.75,"fy":"2023","sd":"04/24/2023","cd":"2024-03-11","lat":14.579864,"lon":120.977052,"sm":null,"fm":null,"tm":null,"am":550,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[3875],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,991,587.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":760},{"i":3882,"cid":"22OF0125","pid":"P00632721LZ","t":"Construction of Road and Drainage Improvement at Barangay Baesa, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"ENYE CONSTRUCTION & DEVELOPMENT INC.","c":19012215.8,"abc":19599878.85,"fy":"2022","sd":"03/22/2022","cd":"2022-10-24","lat":14.666595,"lon":121.057855,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2865},{"i":3883,"cid":"24OC0106","pid":"P00844675LZ","t":"Construction of Revetment at Don Galo River - Moonwalk Creek Junction Phase 2, District 2, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU","c":29155410.96,"abc":29400000.0,"fy":"2024","sd":"07/04/2024","cd":"2024-10-31","lat":14.498731,"lon":121.01337,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Don Galo","wn":"Don Galo Creek","wd":1.31,"wp":[14.50515,121.02359],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2866},{"i":3884,"cid":"23OE0056","pid":"P00725508LZ","t":"Construction of Retention Basin along Estero de Valencia (Phase V), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / RJR CALCON CORP.","c":87814653.82,"abc":90178569.15,"fy":"2023","sd":"02/23/2023","cd":"2024-02-20","lat":14.603216,"lon":121.002065,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.60321,121.00199],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":108},{"i":3885,"cid":"23CD0016","pid":"P00726729LZ","t":"Construction of Flood Control Structure along Angat River (San Roque Section), Angat, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"ANGAT (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":47039291.85,"abc":47039419.26,"fy":"2023","sd":"02/22/2023","cd":"2023-09-19","lat":14.93133,"lon":121.03403,"sm":60,"fm":60,"tm":60,"am":60,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.93131,121.03462],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3189,3747],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23CD0016 to 23CD0018) cover the same site, together worth PHP 138,114,039.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":553},{"i":3886,"cid":"22OB0002","pid":"P00620765LZ","t":"Construction of San Luis Batis Pumping Station, Brgy. Batis, San Juan City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING / NEW EASTPOINT BUILDERS CORP.","c":89838069.12,"abc":94568883.13,"fy":"2022","sd":"02/16/2022","cd":"2023-01-16","lat":14.598304,"lon":121.024634,"sm":417,"fm":417,"tm":417,"am":417,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2867},{"i":3887,"cid":"23DQ0054","pid":"P00740645LZ","t":"Construction of Grouted Riprap Slope Protection at Addas 1, San Nicolas II, Bacoor, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"R.K.F. BUILDERS","c":4654105.75,"abc":4899985.76,"fy":"2023","sd":"04/03/2023","cd":"2023-07-01","lat":14.43408,"lon":120.97709,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2868},{"i":3888,"cid":"23OE0009","pid":"P00725507LZ","t":"Installation of Booster Pump along Estero de Valencia (Phase I), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / ST. TIMOTHY CONSTRUCTION CORPORATION","c":90183040.8,"abc":90183433.1,"fy":"2023","sd":"02/17/2023","cd":"2023-06-26","lat":14.603296,"lon":121.002078,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.60332,121.002],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":109},{"i":3889,"cid":"23CE0023","pid":"P00726166LZ","t":"Construction of Flood Control Structure along Talavera River, Barangay Tabulac, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) / IJK MAE CONSTRUCTION INC.","c":48999972.55,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-10-27","lat":15.755362,"lon":121.013467,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.7554,121.01368],"wst":"matched","br":"Tabulac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2869},{"i":3890,"cid":"23OE0019","pid":"P00725477LZ","t":"Installation of Booster Pump along Estero dela Reina, Barangay 9, (Phase II), Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93816118.9,"abc":96499495.2,"fy":"2023","sd":"02/16/2023","cd":"2023-07-25","lat":14.607886,"lon":120.970376,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.60787,120.97047],"wst":"matched","br":"9","len":null,"ph":"Phase II","dup":[3896,3902],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 190,554,910.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":554},{"i":3891,"cid":"22OC0184","pid":"P00620920LZ","t":"Improvement of Slope Protection of Sapang Buwaya Creek Near Annex 31 Subdivision (Phase VII), Brgy. Marcelo Green, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / P.L.G.L. CONSTRUCTION","c":48993324.65,"abc":49000000.0,"fy":"2022","sd":"06/22/2022","cd":"2023-02-16","lat":14.472637,"lon":121.034065,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.53,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase VII","dup":[],"run":[3983,3934],"cl":[3125,3152,3172,3299,3393,3934,3983],"L":"field","s":45,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0182 to 22OC0184) cover the same site, together worth PHP 146,985,631.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":139},{"i":3892,"cid":"23OG0076","pid":"P00727029LZ","t":"Rehabilitation of Lagarian Creek, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":19557713.2,"abc":19599546.5,"fy":"2023","sd":"03/29/2023","cd":"2024-03-14","lat":14.62869,"lon":121.05827,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.0,"wp":[14.62869,121.05827],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2870},{"i":3893,"cid":"22DI0069","pid":"P00620220LZ","t":"Construction of Revetment / Riverwall along San Isidro River, Sitio Bayan Bayanan, Brgy. San Vicente, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":88466408.87,"abc":91675000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-04-03","lat":14.34567,"lon":121.02464,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":14.35,"wp":[14.47354,121.00247],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2871},{"i":3894,"cid":"23OD0001","pid":"P00725561LZ","t":"Construction of Flood Control Wall along Orosco Creek, Phase 2, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":57081541.95,"abc":58544305.33,"fy":"2023","sd":"02/21/2023","cd":"2023-07-28","lat":14.705711,"lon":121.002164,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":"Orosco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2872},{"i":3895,"cid":"22OC0152","pid":"P00637039LZ","t":"Construction of Groundsill / Revetment Wall along Makati Diversion Channel, Brgy. San Lorenzo, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-05-22","lat":14.552864,"lon":121.014106,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Makati Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2873},{"i":3896,"cid":"23OE0070","pid":"P00726003LZ","t":"Installation of Booster Pump along Estero dela Reina (Phase I), Barangay 9, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":48989429.12,"abc":48999790.18,"fy":"2023","sd":"02/17/2023","cd":"2023-06-23","lat":14.607886,"lon":120.970376,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.60787,120.97047],"wst":"matched","br":"9","len":null,"ph":"Phase I","dup":[3890,3902],"run":[3838,3844,3979,3902],"cl":[],"L":"field","s":52,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 190,554,910.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OE0068 to 23OE0073) cover the same site, together worth PHP 286,156,184.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":92},{"i":3897,"cid":"24OD0020","pid":"P00820045LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Barangay 176 Phase 9, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY","c":89565038.74,"abc":91673549.8,"fy":"2024","sd":"02/14/2024","cd":"2024-07-22","lat":14.784614,"lon":121.034215,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"176 Phase 9","len":null,"ph":"Phase 9","dup":[3903],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 137,535,711.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":805},{"i":3898,"cid":"24CD0112","pid":"P00823480LZ","t":"Construction of Flood Control Structure along Angat River, Barangay Matictic (Right Side), Norzagaray, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"NORZAGARAY (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"DEVEX INCORPORATED","c":42525092.5,"abc":42525451.98,"fy":"2024","sd":"03/25/2024","cd":"2024-10-12","lat":14.908802,"lon":121.058383,"sm":1025,"fm":1025,"tm":1025,"am":1025,"md":0.0,"ls":"inside","ww":"Angat","wn":"Angat River","wd":0.06,"wp":[14.90832,121.05854],"wst":"matched","br":"Matictic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2874},{"i":3899,"cid":"22DQ0050","pid":"P00620222LZ","t":"Construction of Revetment along Baluctot River, Phase 1, Dasmariñas City, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF DASMARIÑAS (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"ALMAKAR BUILDERS & METAL WORKS","c":96494250.28,"abc":96499997.17,"fy":"2022","sd":"03/07/2022","cd":"2023-12-04","lat":14.35203,"lon":120.9771,"sm":382,"fm":382,"tm":382,"am":382,"md":0.0,"ls":"inside","ww":"Baluctot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2875},{"i":3900,"cid":"23OG0047","pid":"P00726033LZ","t":"Rehabilitation of Flood Mitigation Structure along Lagarian Creek, Quezon City (Phase II)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"LIM GENERAL CONTRACTOR CORPORATION","c":9799232.55,"abc":9799811.8,"fy":"2023","sd":"02/20/2023","cd":"2023-11-27","lat":14.625551,"lon":121.024863,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.0,"wp":[14.62554,121.02486],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2876},{"i":3901,"cid":"21OD0143","pid":"P00525794LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 167, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":14310181.46,"abc":14692196.51,"fy":"2021","sd":"02/24/2022","cd":"2022-08-22","lat":14.73407,"lon":121.01413,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"167","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2877},{"i":3902,"cid":"23OE0073","pid":"P00726001LZ","t":"Installation of Booster Pump along Estero dela Reina (Phase V), Barangay 9, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":47749362.48,"abc":48999823.74,"fy":"2023","sd":"02/17/2023","cd":"2023-07-25","lat":14.607886,"lon":120.970376,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.60787,120.97047],"wst":"matched","br":"9","len":null,"ph":"Phase V","dup":[3890,3896],"run":[3838,3844,3896,3979],"cl":[],"L":"field","s":50,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 190,554,910.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OE0068 to 23OE0073) cover the same site, together worth PHP 286,156,184.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":103},{"i":3903,"cid":"24OD0063","pid":"P00820580LZ","t":"Construction of Box Culvert along Barangay 173, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"WAWAO BUILDERS","c":47970672.03,"abc":48999682.29,"fy":"2024","sd":"02/14/2024","cd":"2024-07-03","lat":14.784614,"lon":121.034215,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"173","len":null,"ph":null,"dup":[3897],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 137,535,711.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":919},{"i":3904,"cid":"22OD0070","pid":"P00620024LZ","t":"Construction of Flood Control Wall along the Banks of Creek, Brgy. 176, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":65374049.41,"abc":66781067.47,"fy":"2022","sd":"02/11/2022","cd":"2022-09-19","lat":14.778364,"lon":121.058459,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"176","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2878},{"i":3905,"cid":"23OE0042","pid":"P00725506LZ","t":"Construction of Retarding Basin at Estero dela Reina, Barangay 290, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ALLEYWAY CONSTRUCTION","c":94716532.95,"abc":95992923.27,"fy":"2023","sd":"02/17/2023","cd":"2024-08-05","lat":14.600272,"lon":120.977116,"sm":null,"fm":null,"tm":null,"am":211,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60023,120.97711],"wst":"matched","br":"290","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":110},{"i":3906,"cid":"24OE0010","pid":"P00820624LZ","t":"Installation of Pumping Station (Mini Pump) at Barangay 601, Zone 59 and Barangay 602, Zone 60, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":48891968.68,"abc":48999992.74,"fy":"2024","sd":"02/07/2024","cd":"2025-01-02","lat":14.59602,"lon":121.0251,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"601","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":111},{"i":3907,"cid":"23DQ0048","pid":"P00737510LZ","t":"Construction of Grouted Riprap Slope Protection at Addas 1, Barangay San Nicolas II, Bacoor City, Cavite","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"CAVITE","mu":"BACOOR CITY (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"R.K.F. BUILDERS","c":4703829.86,"abc":4949983.33,"fy":"2023","sd":"04/03/2023","cd":"2023-07-01","lat":14.43387,"lon":120.97713,"sm":98,"fm":98,"tm":98,"am":98,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2879},{"i":3908,"cid":"23OC0088","pid":"P00727009LZ","t":"Construction of Revetment near Salvador Bridge (Upstream Side), Barangay San Isidro, Parañaque City, Metro Manila","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"EURO CONSTRUCTION AND SUPPLY ( FORMERLY: EURO CONSTRUCTION AND TRADING)","c":48999076.1,"abc":49000000.0,"fy":"2023","sd":"05/23/2023","cd":"2024-03-17","lat":14.475226,"lon":121.002172,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3199,3460,3475,3631,3748,3825,3914],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":996},{"i":3909,"cid":"24OE0003","pid":"P00820085LZ","t":"Installation of Booster Pump along Estero dela Reina, Barangay 9, (Phase VI) Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":94322661.24,"abc":96499871.93,"fy":"2024","sd":"02/08/2024","cd":"2024-07-15","lat":14.60308,"lon":120.97042,"sm":null,"fm":null,"tm":null,"am":1343,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.18,"wp":[14.60351,120.97203],"wst":"matched","br":"9","len":null,"ph":"Phase VI","dup":[3915],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 189,648,989.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":806},{"i":3910,"cid":"23OF0030","pid":"P00736173LZ","t":"Rehabilitation of Flood Control Structure (Phase 2), Barangay Gulod, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":48019705.02,"abc":48999699.0,"fy":"2023","sd":"02/14/2023","cd":"2023-12-10","lat":14.71054,"lon":121.034216,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gulod","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2880},{"i":3911,"cid":"24CD0053","pid":"P00820236LZ","t":"Construction of Flood Mitigation Facility along Santo Cristo River, San Jose del Monte City, Bulacan","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96497855.1,"abc":96499940.27,"fy":"2024","sd":"02/22/2024","cd":"2024-08-09","lat":14.83059,"lon":121.0586,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Santo Cristo","wn":"Santo Cristo Creek","wd":19.59,"wp":[14.65788,121.01883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2881},{"i":3912,"cid":"22OC0014","pid":"P00632711LZ","t":"Construction of Groundsill / Revetment wall along Makati Diversion Channel (Phase 2), Barangay San Lorenzo, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":49500000.0,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-05-28","lat":14.552128,"lon":121.014242,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Makati Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Lorenzo","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":761},{"i":3913,"cid":"22CD0048","pid":"P00620524LZ","t":"Construction of Flood Control Structure along Daang Maharlika Road at Tigpalas Creek, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":38602322.03,"abc":39199830.15,"fy":"2022","sd":"02/28/2022","cd":"2023-08-13","lat":15.15238,"lon":120.97721,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Tigpalas","wn":"Tigpalas Creek 2","wd":0.0,"wp":[15.15242,120.9772],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2882},{"i":3914,"cid":"24OC0114","pid":"P00844674LZ","t":"Rehabilitation of Drainage System and its Vicinity, Brgy. San Isidro, Parañaque City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":14699900.18,"abc":14700000.0,"fy":"2024","sd":"06/27/2024","cd":"2024-10-23","lat":14.463375,"lon":121.002174,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[3115,3168,3195,3199,3460,3475,3631,3748,3825,3908],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.31,"value":11,"text":"11 separate contracts name Barangay San Isidro (2021 to 2024), totalling PHP 289,843,407.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1080},{"i":3915,"cid":"24OE0031","pid":"P00823240LZ","t":"Installation of Booster Pump along Estero dela Reina (Phase 7), Barangay 9, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":95326327.4,"abc":96499295.44,"fy":"2024","sd":"02/07/2024","cd":"2024-07-15","lat":14.60308,"lon":120.97042,"sm":null,"fm":null,"tm":null,"am":1343,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.18,"wp":[14.60351,120.97203],"wst":"matched","br":"9","len":null,"ph":"Phase 7","dup":[3909],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 189,648,989.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":762},{"i":3916,"cid":"24CD0077","pid":"P00820182LZ","t":"Construction of Dike along Santo Cristo River, Barangay Dulong Bayan, San Jose del Monte City, Bulacan","w":"Construction of Dike","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498309.12,"abc":96499952.4,"fy":"2024","sd":"02/26/2024","cd":"2024-11-11","lat":14.835276,"lon":121.034263,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Santo Cristo","wn":"Santo Cristo Creek","wd":19.7,"wp":[14.65788,121.01883],"wst":"matched","br":"Dulong Bayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2883},{"i":3917,"cid":"24OE0034","pid":"P00823243LZ","t":"Installation of Booster Pump at Estero de Magdalena, La Torre St. (Package 1a), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":144719698.2,"abc":144749997.3,"fy":"2024","sd":"02/16/2024","cd":"2024-06-20","lat":14.608203,"lon":120.97723,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.6082,120.97725],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[3008,3727,3731],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OE0034 to 24OE0037) cover the same site, together worth PHP 506,589,934.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":184},{"i":3918,"cid":"22OE0030","pid":"P00631036LZ","t":"Rehabilitation of Drainage System at Zone 41-57, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":48999810.66,"abc":48999989.6,"fy":"2022","sd":"02/23/2022","cd":"2022-10-17","lat":14.604035,"lon":121.002244,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":112},{"i":3919,"cid":"24CD0058","pid":"P00820267LZ","t":"Construction of Slope Protection Structure, Barangay Kaypian, San Jose del Monte City, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":96495510.66,"abc":96499740.0,"fy":"2024","sd":"02/22/2024","cd":"2024-12-13","lat":14.830614,"lon":121.058646,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaypian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2884},{"i":3920,"cid":"24OE0172","pid":"P00824609LZ","t":"Installation of Booster Pump Accessories along Estero de Vitas, Barangay 151, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":48997795.07,"abc":48999956.39,"fy":"2024","sd":"02/08/2024","cd":"2024-06-13","lat":14.617982,"lon":120.970443,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.0,"wp":[14.61799,120.97045],"wst":"matched","br":"151","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":113},{"i":3921,"cid":"23DC0120","pid":"P00745444LZ","t":"Repair Maintenance of Flood Control and Drainage Structures, Quiling II, Bridge K0078+318, Talisay, Batangas","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"TALISAY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"BCVILLASENOR CONSTRUCTION","c":4825000.0,"abc":4825000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-06-02","lat":14.094138,"lon":121.034421,"sm":1530,"fm":1530,"tm":1530,"am":1530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2885},{"i":3922,"cid":"25OE0027","pid":"P00920745LZ","t":"Installation of Pump Accessories along Estero de Magdalena, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"GOLDEN J'S CONSTRUCTION SERVICES","c":48015187.82,"abc":48999896.41,"fy":"2025","sd":"02/14/2025","cd":"2025-03-12","lat":14.608219,"lon":120.97724,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Magdalena","wn":"Estero de Magdalena","wd":0.0,"wp":[14.60822,120.97726],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":26,"text":"A PHP 48,015,188 contract recorded as completed 26 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":615},{"i":3923,"cid":"24C00496","pid":"P00844532LZ","t":"Construction of Flood Control Structure along Malangaan River (Upstream), Barangay Camachile, Doña Remedios Trinidad, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"DOÑA REMEDIOS TRINIDAD (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"FIVE TRAVELLERS CONSTRUCTION INC.","c":48249750.32,"abc":48249412.9,"fy":"2024","sd":"06/17/2024","cd":"2025-02-11","lat":15.0044,"lon":121.0587,"sm":529,"fm":529,"tm":529,"am":1352,"md":0.35,"ls":"boundary","ww":"Malangaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Camachile","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2886},{"i":3924,"cid":"24OE0180","pid":"P00843172LZ","t":"Rehabilitation of Drainage System, Zone 1-12, Tondo, Manila City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / MNJAP CONSTRUCTION SERVICES","c":96221240.82,"abc":96499841.66,"fy":"2024","sd":"02/20/2024","cd":"2024-08-19","lat":14.61737,"lon":120.970502,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":114},{"i":3925,"cid":"22OE0120","pid":"P00620422LZ","t":"Bank Improvement (Steel Sheet Pile) along Estero de San Lazaro, Barangay 297, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":25751991.02,"abc":26007106.48,"fy":"2022","sd":"02/23/2022","cd":"2022-09-26","lat":14.602267,"lon":120.977245,"sm":null,"fm":null,"tm":null,"am":1378,"md":null,"ls":"unknown","ww":"de San Lazaro","wn":"Estero de San Lazaro","wd":0.0,"wp":[14.60228,120.97725],"wst":"matched","br":"297","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":115},{"i":3926,"cid":"24CD0168","pid":"P00844749LZ","t":"Construction of Flood Control Structure, Barangay Francisco Homes Mulawin - Barangay Narra, San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48257458.19,"abc":48999805.26,"fy":"2024","sd":"04/30/2024","cd":"2025-02-12","lat":14.802463,"lon":121.058726,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Francisco Homes Mulawin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2887},{"i":3927,"cid":"22OD0173","pid":"P00621430LZ","t":"Construction of Flood Control Wall along Kabatuhan Compound, Brgy. Gen. T. De Leon, Valenzuela City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"VALENZUELA CITY","mu":"CITY OF VALENZUELA (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"SONPRO CONSTRUCTION","c":19005625.23,"abc":19593440.87,"fy":"2022","sd":"03/24/2022","cd":"2023-05-08","lat":14.688004,"lon":121.002255,"sm":436,"fm":436,"tm":436,"am":436,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gen. T. De Leon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2888},{"i":3928,"cid":"23OE0046","pid":"P00740280LZ","t":"Construction of Retention Basin at Estero dela Reina, (Phase XII), Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":96219232.12,"abc":96499854.46,"fy":"2023","sd":"03/28/2023","cd":"2024-07-15","lat":14.608124,"lon":120.970537,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.60808,120.97059],"wst":"matched","br":null,"len":null,"ph":"Phase XII","dup":[],"run":[3951,3162,3319],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0045 to 23OE0048) cover the same site, together worth PHP 350,867,677.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":283},{"i":3929,"cid":"22OF0103","pid":"P00640489LZ","t":"Construction of Flood Control Structure and Tributaries, Bagong Silangan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"ALPIZ CONSTRUCTION & DEVELOPMENT CORPORATION","c":18816000.0,"abc":19600000.0,"fy":"2022","sd":"05/17/2022","cd":"2023-01-11","lat":14.64134,"lon":121.002326,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2889},{"i":3930,"cid":"22OE0005","pid":"P00620101LZ","t":"Installation of Booster Pump including Retarding Basin at Estero de Vitas, Barangay 151, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96303461.75,"abc":96499763.57,"fy":"2022","sd":"02/23/2022","cd":"2023-07-25","lat":14.618102,"lon":120.970561,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.02,"wp":[14.61797,120.9705],"wst":"matched","br":"151","len":null,"ph":null,"dup":[3935,3939],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 283,968,481.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":555},{"i":3931,"cid":"23OF0052","pid":"P00740507LZ","t":"Construction of Flood Control Structures at Brgy. Pasong Tamo, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":29399680.87,"abc":29399999.54,"fy":"2023","sd":"03/21/2023","cd":"2023-11-13","lat":14.68844,"lon":121.05896,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pasong Tamo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2890},{"i":3932,"cid":"24OC0118","pid":"P00848601LZ","t":"Construction of Flood Mitigation Structure along Villanueva Creek, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":79048492.76,"abc":79200000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-02-02","lat":14.47417,"lon":121.002337,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.33,"wp":[14.47689,121.00363],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2891},{"i":3933,"cid":"22DQ0024","pid":"P00632879LZ","t":"Construction of Drainage (Bulangan), Barangay Maduya, Carmona, Cavite","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":4949610.57,"abc":39599727.15,"fy":"2022","sd":"02/17/2022","cd":"2022-08-15","lat":14.31562,"lon":121.05899,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maduya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2892},{"i":3934,"cid":"22OC0183","pid":"P00620919LZ","t":"Improvement of Slope Protection of Sapang Buwaya Creek Near Annex 31 Subdivision (Phase VI), Brgy. Marcelo Green, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":48995753.41,"abc":49000000.0,"fy":"2022","sd":"06/22/2022","cd":"2023-05-22","lat":14.47171,"lon":121.034558,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.55,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase VI","dup":[],"run":[3983,3891],"cl":[3125,3152,3172,3299,3393,3891,3983],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0182 to 22OC0184) cover the same site, together worth PHP 146,985,631.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":132},{"i":3935,"cid":"22OE0007","pid":"P00620097LZ","t":"Installation of Booster Pump including Accessories at Estero de Vitas, Barangay 151, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93818961.57,"abc":96499960.27,"fy":"2022","sd":"02/18/2022","cd":"2022-11-17","lat":14.618102,"lon":120.970561,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.02,"wp":[14.61797,120.9705],"wst":"matched","br":"151","len":null,"ph":null,"dup":[3930,3939],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 283,968,481.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":556},{"i":3936,"cid":"24C00494","pid":"P00844528LZ","t":"Construction of Flood Control Structure along Balaong River (Purok 1 Section, Upstream), Barangay Tartaro, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"SAN MIGUEL (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":48248500.57,"abc":48249521.51,"fy":"2024","sd":"07/01/2024","cd":"2025-02-25","lat":15.159416,"lon":121.034686,"sm":1330,"fm":1330,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Balaong","wn":"Balaong River","wd":1.66,"wp":[15.15082,121.02206],"wst":"matched","br":"Tartaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2893},{"i":3937,"cid":"22OD0069","pid":"P00620401LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 160, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":44130056.18,"abc":45076692.42,"fy":"2022","sd":"02/08/2022","cd":"2022-12-12","lat":14.686224,"lon":121.002349,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"160","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2894},{"i":3938,"cid":"23DI0048","pid":"P00725846LZ","t":"Construction of Structure for Riverbank Protection along Sta. Rosa River, (near Technopark), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96492115.43,"abc":96500000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-12-14","lat":14.264103,"lon":121.059157,"sm":419,"fm":419,"tm":419,"am":371,"md":0.07,"ls":"boundary","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[3944],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,991,202.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":763},{"i":3939,"cid":"22OE0019","pid":"P00620103LZ","t":"Installation of Automatic Trash Screen & Horizontal Conveyor & Accessories at Estero de Vitas, Barangay 151, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":93846057.69,"abc":96498810.64,"fy":"2022","sd":"04/01/2022","cd":"2022-11-17","lat":14.618102,"lon":120.970561,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.02,"wp":[14.61797,120.9705],"wst":"matched","br":"151","len":null,"ph":null,"dup":[3930,3935],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 283,968,481.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":557},{"i":3940,"cid":"24OG0102","pid":"P00845879LZ","t":"Construction of River Capacity Enhancement Structure along Lagarian Creek, Quezon City (Phase VI)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":49498395.28,"abc":49499939.9,"fy":"2024","sd":"03/26/2024","cd":"2024-12-20","lat":14.6254,"lon":121.0347,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lagarian","wn":"Lagarian Creek","wd":0.0,"wp":[14.62542,121.03471],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2895},{"i":3941,"cid":"23OE0081","pid":"P00725498LZ","t":"Rehabilitation of Estero de Vitas, (Phase I), Tondo, Manila","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"LE BRON CONSTRUCTION","c":38592779.28,"abc":38597907.41,"fy":"2023","sd":"02/17/2023","cd":"2023-09-23","lat":14.617928,"lon":120.970578,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"de Vitas","wn":"Estero de Vitas","wd":0.0,"wp":[14.61793,120.97058],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":116},{"i":3942,"cid":"24OE0171","pid":"P00824614LZ","t":"Construction of Retarding Basin along Estero de Valencia, Manila City (Phase VIII)","w":"Construction of Retarding Basin","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / MANGEN TECHNO-BUILDERS INC.","c":48803086.9,"abc":48999608.47,"fy":"2024","sd":"02/12/2024","cd":"2024-12-13","lat":14.601074,"lon":121.00237,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.60111,121.0023],"wst":"matched","br":null,"len":null,"ph":"Phase VIII","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":117},{"i":3943,"cid":"24OE0011","pid":"P00820070LZ","t":"Construction of Retarding Basin at Estero dela Reina (Phase XXI), Tondo, Manila City","w":"Construction of Retarding Basin","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION / F316 CONSTRUCTION CORP.","c":96349103.73,"abc":96499937.49,"fy":"2024","sd":"02/08/2024","cd":"2025-03-17","lat":14.606302,"lon":120.970606,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60631,120.97063],"wst":"matched","br":null,"len":null,"ph":"Phase XXI","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":118},{"i":3944,"cid":"23DI0053","pid":"P00725847LZ","t":"Construction of Structure for Riverbank Protection along Sta. Rosa River, (near CALAX), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":96499086.72,"abc":96500000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-12-08","lat":14.264103,"lon":121.059157,"sm":419,"fm":419,"tm":419,"am":371,"md":0.07,"ls":"boundary","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[3938],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,991,202.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":764},{"i":3945,"cid":"22OF0228","pid":"P00639311LZ","t":"Construction of Flood Control Structure within Brgy. Sta. Monica, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"PRECIOUS CONSTRUCTION / DARCY & ANNA BUILDERS & TRADING","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-08-07","lat":14.700705,"lon":121.034768,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2896},{"i":3946,"cid":"21BI0045","pid":"P00525974LZ","t":"Improvement of Manamtam River Control along Matuno River, Manamtam Section, Sta. 0+360 - Sta. 0+510, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":24519676.04,"abc":29400000.0,"fy":"2021","sd":"04/05/2022","cd":"2022-11-18","lat":16.389788,"lon":121.059489,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Manamtam","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2897},{"i":3947,"cid":"21OE0018","pid":"P00525819LZ","t":"Construction of Retention Basin along Estero de Valencia Phase III, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":null,"deo":"North Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":46940474.1,"abc":48999544.34,"fy":"2021","sd":"06/09/2021","cd":"2022-11-30","lat":14.602398,"lon":121.002408,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia Phase III","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":119},{"i":3948,"cid":"24CD0169","pid":"P00844748LZ","t":"Construction of Flood Control Structure, Barangay Francisco Homes Guijo - Barangay Yakal, San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":48257590.02,"abc":48999939.12,"fy":"2024","sd":"04/30/2024","cd":"2025-02-12","lat":14.81203,"lon":121.059491,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Francisco Homes Guijo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2898},{"i":3949,"cid":"23OE0055","pid":"P00725501LZ","t":"Construction of Retention Basin at Estero dela Reina (Phase VI), Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":63351310.49,"abc":63550014.64,"fy":"2023","sd":"02/17/2023","cd":"2024-10-16","lat":14.606391,"lon":120.970642,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60638,120.97061],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":120},{"i":3950,"cid":"22CD0055","pid":"P00620163LZ","t":"Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94568676.93,"abc":94569908.29,"fy":"2022","sd":"03/07/2022","cd":"2022-11-23","lat":14.81899,"lon":121.03509,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Bayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2899},{"i":3951,"cid":"23OE0045","pid":"P00725502LZ","t":"Construction of Retention Basin at Estero dela Reina (Phase V), Tondo, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":63260685.8,"abc":63549934.4,"fy":"2023","sd":"02/16/2023","cd":"2024-07-15","lat":14.606167,"lon":120.970723,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60616,120.9707],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[3928,3162,3319],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23OE0045 to 23OE0048) cover the same site, together worth PHP 350,867,677.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":435},{"i":3952,"cid":"23OC0038","pid":"P00725532LZ","t":"Construction of Flood Mitigation Structure (Installation of Booster Pump) and Groundsill at Villanueva Creek Near Salvador Bridge, District 1, Parañaque City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":82982803.05,"abc":82990000.0,"fy":"2023","sd":"02/15/2023","cd":"2024-04-09","lat":14.473774,"lon":121.002449,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Villanueva","wn":"Villanueva Creek","wd":0.37,"wp":[14.47689,121.00363],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2900},{"i":3953,"cid":"23OB0322","pid":"P00740502LZ","t":"Construction/Improvement of Drainage System, Brgy. Lower Bicutan, Taguig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":49000000.0,"abc":48999816.21,"fy":"2023","sd":"04/27/2023","cd":"2024-06-03","lat":14.490667,"lon":121.059501,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lower Bicutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2901},{"i":3954,"cid":"23OD0088","pid":"P00742113LZ","t":"Construction of Flood Control Wall along Jacinto Creek and Robes Creek, Brgy. 175, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":89748579.45,"abc":91673593.61,"fy":"2023","sd":"06/19/2023","cd":"2023-11-22","lat":14.772958,"lon":121.035159,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Jacinto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2902},{"i":3955,"cid":"23OE0012","pid":"P00725478LZ","t":"Installation of Booster Pump along Estero dela Reina, CM Recto Ave., (Phase I), Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES / JIIK CONSTRUCTION SERVICES","c":96499737.82,"abc":96499808.08,"fy":"2023","sd":"02/17/2023","cd":"2023-07-25","lat":14.60609,"lon":120.970775,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60607,120.97074],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[3958,3961,3963],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 384,759,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":765},{"i":3956,"cid":"23CD0068","pid":"P00725722LZ","t":"Construction of Flood Control Structure, Sapang Palay Proper, City of San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96497531.45,"abc":96499815.98,"fy":"2023","sd":"03/01/2023","cd":"2023-12-29","lat":14.83542,"lon":121.03516,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2903},{"i":3957,"cid":"22OE0008","pid":"P00620436LZ","t":"Construction of Retention Basin along Estero de Valencia, Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JMK BUILDERS CONSTRUCTION","c":29316136.16,"abc":29399785.98,"fy":"2022","sd":"02/23/2022","cd":"2022-09-23","lat":14.601396,"lon":121.002475,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.0,"wp":[14.60141,121.00245],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":121},{"i":3958,"cid":"23OE0021","pid":"P00725479LZ","t":"Installation of Booster Pump along Estero dela Reina, CM Recto Ave., (Phase II), Tondo, Manila","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96452618.46,"abc":96499510.26,"fy":"2023","sd":"02/17/2023","cd":"2023-07-25","lat":14.60609,"lon":120.970775,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60607,120.97074],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[3955,3961,3963],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 384,759,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":766},{"i":3959,"cid":"22OC0023","pid":"P00620374LZ","t":"Rehabilitation/ Upgrading and Drainage Improvement along Sampaguita St. and its Vicinity, Brgy. Comembo and Brgy. Pembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"THE STEADFAST BUILDERS","c":27440000.0,"abc":27440000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-07-03","lat":14.541451,"lon":121.059559,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Comembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2904},{"i":3960,"cid":"22DI0036","pid":"P00620240LZ","t":"Construction of Revetment/Riverwall along San Isidro River, Brgy. Sampaguita, San Pedro City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":77196457.0,"abc":77200000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-11-15","lat":14.34311,"lon":121.03521,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":14.86,"wp":[14.47354,121.00247],"wst":"matched","br":"Sampaguita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2905},{"i":3961,"cid":"24OE0038","pid":"P00823250LZ","t":"Installation of Booster Pump in CM Recto Ave. (Phase 1), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":96362389.26,"abc":96499194.16,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.60609,"lon":120.970775,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[3955,3958,3963],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 384,759,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":767},{"i":3962,"cid":"24OF0008","pid":"P00838479LZ","t":"Rehabilitation of Flood Control Structure, Kaybukot Creek, Barangay Gulod, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":28157584.94,"abc":28468894.2,"fy":"2024","sd":"02/06/2024","cd":"2024-09-16","lat":14.710618,"lon":121.035395,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Kaybukot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gulod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2906},{"i":3963,"cid":"24OE0039","pid":"P00823251LZ","t":"Installation of Booster Pump in CM Recto Ave. (Phase 2), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":95445184.12,"abc":96499153.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":14.60609,"lon":120.970775,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[3955,3958,3961],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 384,759,930.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":768},{"i":3964,"cid":"24OD0010","pid":"P00820610LZ","t":"Construction of Reinforced Concrete Box Culvert along J.P. Rizal St., Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":35678835.1,"abc":37283853.51,"fy":"2024","sd":"02/14/2024","cd":"2025-01-07","lat":14.638395,"lon":120.970797,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2907},{"i":3965,"cid":"23OE0054","pid":"P00725497LZ","t":"Construction of Retention Basin along Estero de Valencia, Barangay 633, Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":43340916.4,"abc":43424387.33,"fy":"2023","sd":"02/17/2023","cd":"2024-05-21","lat":14.59807,"lon":121.002722,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.01,"wp":[14.59806,121.00267],"wst":"matched","br":"633","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":122},{"i":3966,"cid":"23OD0012","pid":"P00725980LZ","t":"Construction of Flood Control Wall along the Bank of Creeks in Phase 7, Brgy. 176, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"WAWAO BUILDERS","c":47774811.92,"abc":48999821.53,"fy":"2023","sd":"02/21/2023","cd":"2023-12-27","lat":14.776904,"lon":121.059794,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"176","len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2908},{"i":3967,"cid":"24OE0069","pid":"P00820051LZ","t":"Construction of Flood Mitigation Structure along Estero dela Reina, Barangay 268, Manila City","w":"Construction of Revetment","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":67305759.15,"abc":67549777.01,"fy":"2024","sd":"02/08/2024","cd":"2025-01-12","lat":14.60585,"lon":120.970828,"sm":null,"fm":null,"tm":null,"am":1343,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.60585,120.97084],"wst":"matched","br":"268","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":123},{"i":3968,"cid":"22OD0044","pid":"P00620406LZ","t":"Construction of Flood Control Wall along the Banks of Creeks, Brgy. 173 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":43645007.79,"abc":45064559.78,"fy":"2022","sd":"02/08/2022","cd":"2022-09-13","lat":14.759148,"lon":121.035422,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"173","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2909},{"i":3969,"cid":"21CD0132","pid":"P00526012LZ","t":"Construction of Flood Control Structures along Bulo River (Sta. Lucia Section), Barangay Sta. Lucia, San Miguel, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"San Miguel","deo":"Bulacan 2nd District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":23519992.2,"abc":24499991.84,"fy":"2021","sd":"03/30/2022","cd":"2023-12-08","lat":15.226487,"lon":121.002902,"sm":1330,"fm":null,"tm":1330,"am":1330,"md":0.0,"ls":"inside","ww":"Bulo","wn":"Bulo River","wd":0.01,"wp":[15.22648,121.00283],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2910},{"i":3970,"cid":"24P00029","pid":"P00820152LZ","t":"Construction of Manaan Flood Control (Phase II), Luhong, Tinoc, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"TINOC (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION","c":96500000.0,"abc":96496478.88,"fy":"2024","sd":"03/18/2024","cd":"2024-12-15","lat":16.649855,"lon":120.970923,"sm":1571,"fm":1571,"tm":1571,"am":1571,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2911},{"i":3971,"cid":"24DQ0008","pid":"P00825114LZ","t":"Construction of Revetment along Carmona River, Brgy. Mabuhay, Carmona, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":125838791.7,"abc":125838870.7,"fy":"2024","sd":"02/14/2024","cd":"2025-02-28","lat":14.29939,"lon":121.03544,"sm":343,"fm":343,"tm":343,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":1.59,"wp":[14.2929,121.0486],"wst":"matched","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2912},{"i":3972,"cid":"22OH0081","pid":"P00630923LZ","t":"Construction of Drainage System (Box Culvert) along Labores Street, Pandacan, Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":54455277.96,"abc":54461091.93,"fy":"2022","sd":"04/13/2022","cd":"2023-12-22","lat":14.58955,"lon":121.003028,"sm":1079,"fm":null,"tm":1079,"am":1079,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[3975],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 112,115,378.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1081},{"i":3973,"cid":"23DI0047","pid":"P00725827LZ","t":"Construction of Flood Protection Structure Phase 2, (Biñan-Sta.Rosa Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":93797418.0,"abc":96500000.0,"fy":"2023","sd":"02/24/2023","cd":"2024-03-16","lat":14.264633,"lon":121.060144,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2913},{"i":3974,"cid":"24OG0017","pid":"P00839534LZ","t":"Rehabilitation of Drainage System, Barangay Kamuning, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MANCOL CONSTRUCTION CORPORATION","c":29697364.69,"abc":29698930.67,"fy":"2024","sd":"02/08/2024","cd":"2024-09-23","lat":14.627797,"lon":121.03549,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kamuning","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2914},{"i":3975,"cid":"23OH0040","pid":"P00725509LZ","t":"Construction of Drainage System (Box Culvert) Labores St. and Vicinity (Phase II), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"N.M.E. CONSTRUCTION","c":57660100.17,"abc":57899904.12,"fy":"2023","sd":"02/27/2023","cd":"2024-05-03","lat":14.58955,"lon":121.003028,"sm":null,"fm":null,"tm":null,"am":1079,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[3972],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 112,115,378.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1082},{"i":3976,"cid":"23OE0083","pid":"P00727025LZ","t":"Construction of Box Culvert along Anonas St., Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":44092161.16,"abc":44099986.6,"fy":"2023","sd":"03/01/2023","cd":"2023-09-30","lat":14.597978,"lon":121.00351,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":124},{"i":3977,"cid":"23OE0190","pid":"P00742244LZ","t":"Construction of Retention Basin at Estero dela Reina, Tondo, Manila City (Phase X)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC. / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":95158284.39,"abc":96499826.5,"fy":"2023","sd":"03/20/2023","cd":"2024-04-15","lat":14.617099,"lon":120.970949,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.6171,120.97091],"wst":"matched","br":null,"len":null,"ph":"Phase X","dup":[3978],"run":[3166,3114,3128,3175,3180,3134,3143,3110],"cl":[],"L":"field","s":51,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 159,370,796.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OE0190 to 23OE0199) cover the same site, together worth PHP 762,552,439.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":94},{"i":3978,"cid":"24OE0002","pid":"P00820057LZ","t":"Construction of Pumping Station at Estero dela Reina, Barangay 55 (Phase II), Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"A.M. SALONG CONSTRUCTION","c":64212511.86,"abc":65619438.74,"fy":"2024","sd":"02/08/2024","cd":"2024-09-26","lat":14.617099,"lon":120.970949,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.6171,120.97091],"wst":"matched","br":"55","len":null,"ph":"Phase II","dup":[3977],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 159,370,796.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1083},{"i":3979,"cid":"23OE0072","pid":"P00726002LZ","t":"Construction of Pumping Station at Estero dela Reina, Barangay 55, Tondo, Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"JELSIE CONSTRUCTION & SUPPLY","c":47747381.33,"abc":48999542.28,"fy":"2023","sd":"02/16/2023","cd":"2024-07-16","lat":14.617079,"lon":120.970958,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.0,"wp":[14.61708,120.97091],"wst":"matched","br":"55","len":null,"ph":null,"dup":[],"run":[3838,3844,3896,3902],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (23OE0068 to 23OE0073) cover the same site, together worth PHP 286,156,184.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":558},{"i":3980,"cid":"22OE0013","pid":"P00620033LZ","t":"Construction of Retarding Basin at Estero dela Reina, (Phase II), Manila City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48192506.57,"abc":50469124.32,"fy":"2022","sd":"02/23/2022","cd":"2023-12-13","lat":14.61709,"lon":120.97098,"sm":null,"fm":null,"tm":null,"am":1580,"md":null,"ls":"unknown","ww":"dela Reina","wn":"Estero de la Reina","wd":0.01,"wp":[14.61709,120.97091],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[3003],"run":[3010,3226],"cl":[],"L":"field","s":48,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 117,308,825.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OE0011 to 22OE0013) cover the same site, together worth PHP 146,190,709.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":111},{"i":3981,"cid":"24BJ0007","pid":"P00839468LZ","t":"Construction of Flood Control Structure along Santa Fe River, Barangay Banganan, Aritao, Nueva Vizcaya","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":57899799.23,"abc":57900000.0,"fy":"2024","sd":"06/10/2024","cd":"2025-02-11","lat":16.293333,"lon":121.035555,"sm":74,"fm":74,"tm":74,"am":74,"md":0.0,"ls":"inside","ww":"Santa Fe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Banganan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2915},{"i":3982,"cid":"22CE0030","pid":"P00620153LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Palestina, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":57899979.93,"abc":57900000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-27","lat":15.778152,"lon":121.003554,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.02,"wp":[15.77823,121.00343],"wst":"matched","br":"Palestina","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2916},{"i":3983,"cid":"22OC0182","pid":"P00620918LZ","t":"Improvement of Slope Protection of Sapang Buwaya Creek Near Annex 31 Subdivision (Phase V), Brgy. Marcelo Green, Parañaque City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PARAÑAQUE CITY","mu":"CITY OF PARAÑAQUE (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNACIO CONST. CORP.) / P.L.G.L. CONSTRUCTION","c":48996552.93,"abc":49000000.0,"fy":"2022","sd":"06/22/2022","cd":"2023-02-16","lat":14.47713,"lon":121.035795,"sm":411,"fm":411,"tm":411,"am":411,"md":0.0,"ls":"inside","ww":"Sapang Buwaya","wn":"Sapang Buaya","wd":2.89,"wp":[14.46543,121.01181],"wst":"matched","br":"Marcelo Green","len":null,"ph":"Phase V","dup":[],"run":[3934,3891],"cl":[3125,3152,3172,3299,3393,3891,3934],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22OC0182 to 22OC0184) cover the same site, together worth PHP 146,985,631.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Marcelo Green (2019 to 2022), totalling PHP 245,630,349.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":133},{"i":3984,"cid":"24OF0145","pid":"P00844689LZ","t":"Construction of Drainage Systems at Nocom and Various Connecting Drainages, Brgy. Tandang Sora, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"REND ENTERPRISES & GENERAL CONTRACTOR","c":14699417.18,"abc":14699939.4,"fy":"2024","sd":"04/01/2024","cd":"2024-09-27","lat":14.68003,"lon":121.035835,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2917},{"i":3985,"cid":"24DE0029","pid":"P00823539LZ","t":"Construction of Flood Control Structure at Laurel, San Pascual, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN PASCUAL (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"GREENFIELD CONSTRUCTION","c":14475000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-15","lat":13.79916,"lon":121.03611,"sm":1347,"fm":1347,"tm":1347,"am":1347,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2918},{"i":3986,"cid":"22OF0198","pid":"P00639413LZ","t":"Construction of Flood Control Structure at Brgy. Tandang Sora, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":28518000.0,"abc":29400000.0,"fy":"2022","sd":"05/19/2022","cd":"2022-12-12","lat":14.672947,"lon":121.03618,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Sora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2919},{"i":3987,"cid":"23EB0031","pid":"P00727379LZ","t":"Construction of Busuanga Flood Control Structure (Sto. Niño Section), Sta. 0 + 000 - Sta. 0 + 320, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"RIZAL (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / MIGHTY DRAGON BUILDERS INC.","c":45079770.46,"abc":45080000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-07-17","lat":12.46697,"lon":121.03628,"sm":1210,"fm":1210,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":320.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2920},{"i":3988,"cid":"23OD0086","pid":"P00725545LZ","t":"Construction of Flood Control Structure along the Banks of Creeks, Barangay 173, Caloocan City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":85077965.88,"abc":86844395.44,"fy":"2023","sd":"02/21/2023","cd":"2023-11-15","lat":14.75578,"lon":121.03659,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"173","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2921},{"i":3989,"cid":"24OF0020","pid":"P00820632LZ","t":"Construction of Flood Control Structure at Barangay Novaliches Proper, Quezon City (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"FRAMECON BUILDERS","c":48458879.03,"abc":48999550.8,"fy":"2024","sd":"02/06/2024","cd":"2024-11-28","lat":14.714748,"lon":121.036593,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Novaliches Proper","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2922},{"i":3990,"cid":"21OD0187","pid":"P00525778LZ","t":"Construction of Drainage Systems along Barangay 162, Caloocan City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":4790381.17,"abc":4895657.41,"fy":"2021","sd":"02/24/2022","cd":"2022-08-15","lat":14.679958,"lon":121.003919,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"162","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2923},{"i":3991,"cid":"23OD0087","pid":"P00725547LZ","t":"Construction of Flood Control Structure along Jacinto Creek and Robes Creek, Barangay 175, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"E.M. CUERPO, INC. / AYLAN CONSTRUCTION & TRADING","c":85271997.66,"abc":86835047.93,"fy":"2023","sd":"02/21/2023","cd":"2023-12-14","lat":14.772502,"lon":121.036756,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Jacinto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"175","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2924},{"i":3992,"cid":"22CE0086","pid":"P00620535LZ","t":"Construction of Flood Control Structure along Talavera River, Brgy. Tabulac, San Jose City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"SAN JOSE CITY (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IJK MAE CONSTRUCTION INC. / NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES)","c":39092350.45,"abc":39200000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-20","lat":15.745756,"lon":121.00399,"sm":1307,"fm":1307,"tm":1307,"am":1307,"md":0.0,"ls":"inside","ww":"Talavera","wn":"Talavera River","wd":0.24,"wp":[15.74479,121.00601],"wst":"matched","br":"Tabulac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2925},{"i":3993,"cid":"22DI0040","pid":"P00620586LZ","t":"Construction of River Protection Structure along San Isidro River, Brgy. Sampaguita and Brgy. Calendola, San Pedro City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"FOURTH GENERATION T CONSTRUCTION","c":27418464.34,"abc":27440000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-18","lat":14.343888,"lon":121.03681,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro","wd":14.82,"wp":[14.47354,121.00247],"wst":"matched","br":"Sampaguita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2926},{"i":3994,"cid":"23OC0009","pid":"P00725975LZ","t":"Rehabilitation of Drainage System along Dian St., Buendia Ave., and its Laterals, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"PETER G. CHUA BUILDERS","c":7129230.51,"abc":7350000.0,"fy":"2023","sd":"08/14/2023","cd":"2023-12-11","lat":14.555933,"lon":121.004015,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2927},{"i":3995,"cid":"23OE0040","pid":"P00740292LZ","t":"Installation of Booster Pump at Estero de Valencia (Phase III), Manila City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"North Manila District Engineering Office","co":"EIGHT J'S CONSTRUCTION SERVICES","c":96246850.63,"abc":96499452.36,"fy":"2023","sd":"03/28/2023","cd":"2023-09-03","lat":14.605696,"lon":121.004171,"sm":null,"fm":null,"tm":null,"am":1249,"md":null,"ls":"unknown","ww":"de Valencia","wn":"Estero de Valencia","wd":0.0,"wp":[14.60569,121.00417],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":125},{"i":3996,"cid":"22OF0073","pid":"P00631038LZ","t":"Construction of Flood Control Structure at Brgy. Unang Sigaw, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":9507300.5,"abc":9800000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-09-27","lat":14.729435,"lon":121.036936,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Unang Sigaw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2928},{"i":3997,"cid":"24OH0024","pid":"P00820007LZ","t":"Construction of Booster Pumping Station Along Estero de Tripa de Gallina, Pedro Gil Street, Barangay 869, Manila City Phase I","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":55557185.69,"abc":55561317.24,"fy":"2024","sd":"02/23/2024","cd":"2024-06-21","lat":14.57965,"lon":121.004275,"sm":null,"fm":null,"tm":null,"am":1048,"md":null,"ls":"unknown","ww":"de Tripa de Gallina","wn":"Estero de Tripa de Gallina","wd":0.0,"wp":[14.57965,121.00426],"wst":"matched","br":"869","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":126},{"i":3998,"cid":"25OH0006","pid":"P00920131LZ","t":"Construction of Booster Pumping Station Along Estero de Tripa de Gallina Along Pedro Gil Street Barangay 869, Manila City, Phase II","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"CITY OF MANILA","mu":"CITY OF MANILA (METROPOLITAN MANILA)","deo":"South Manila District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / JCA CONSTRUCTION AND CONSTRUCTION SUPPLY","c":137222334.8,"abc":138959615.0,"fy":"2025","sd":"03/03/2025","cd":"2025-05-06","lat":14.579709,"lon":121.004299,"sm":null,"fm":null,"tm":null,"am":1048,"md":null,"ls":"unknown","ww":"de Tripa de Gallina","wn":"Estero de Tripa de Gallina","wd":0.0,"wp":[14.57971,121.00427],"wst":"matched","br":"869","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":127},{"i":3999,"cid":"21OI0070","pid":"P00561603LZ","t":"Construction of Flood Control Structure, Tunasan River, Barangay Tunasan, Muntinlupa City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MUNTINLUPA CITY","mu":"City of Muntinlupa","deo":"Las Piñas-Muntinlupa District Engineering Office","co":"R2CG BUILDERS INC. (FORMERLY: RRCG 8639 BUILDERS INC.)","c":14848853.2,"abc":14849352.77,"fy":"2021","sd":"01/07/2022","cd":"2022-07-05","lat":14.367786,"lon":121.036973,"sm":407,"fm":null,"tm":407,"am":407,"md":0.0,"ls":"inside","ww":"Tunasan","wn":"Tunasan River","wd":0.01,"wp":[14.36766,121.037],"wst":"matched","br":"Tunasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2929},{"i":4000,"cid":"22OB0104","pid":"P00620051LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 3, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":96500000.0,"abc":96499652.55,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.52694,"lon":121.0698,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.01,"wp":[14.52702,121.06974],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[4729,4037,4039,4862,4016,4066,4077,4031,4033],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":209},{"i":4001,"cid":"24BI0063","pid":"P00825056LZ","t":"Construction of Tuao North-Tuao South Flood Control Structure along Magat River, Sitio Dumayop, Tuao North-Tuao South, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-07-22","lat":16.551158,"lon":121.25735,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.15,"wp":[16.55209,121.25633],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2930},{"i":4002,"cid":"21PK0032","pid":"P00525936LZ","t":"Construction of Sidil Flood Control Sta. 170+400 - Sta. 170+470 (L.S.), Pugong, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES","c":2862443.94,"abc":2940000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-08-09","lat":17.392536,"lon":121.16133,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":70.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2931},{"i":4003,"cid":"23DN0095","pid":"P00742446LZ","t":"Construction of Close Canal with Gutter along C. Bolado Ave. (Both Sides) Barangay Tatala, Binangonan, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FRANZCOR TRADING & CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-07-20","lat":14.475898,"lon":121.202486,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"Close","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tatala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2932},{"i":4004,"cid":"23CF0043","pid":"P00726532LZ","t":"Construction of Flood Wall Structure with Secondary Road along Peñaranda River, Purok Camia B, Barangay Rio Chico, Gen. Tinio, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GENERAL TINIO (PAPAYA) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"F-DEY CONSTRUCTION AND TRADING / DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION)","c":94931876.77,"abc":96499975.07,"fy":"2023","sd":"02/23/2023","cd":"2024-06-16","lat":15.354041,"lon":121.069923,"sm":579,"fm":579,"tm":579,"am":579,"md":0.0,"ls":"inside","ww":"Peñaranda","wn":"Peñaranda River","wd":0.04,"wp":[15.35377,121.07009],"wst":"matched","br":"Rio Chico","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2933},{"i":4005,"cid":"22OB0158","pid":"P00620070LZ","t":"Construction of Slope Protection at Hagonoy Pumping Station Retarding Pond, Taguig City (Package 3)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / FRANZCOR TRADING & CONSTRUCTION","c":94570000.0,"abc":94569450.51,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.508831,"lon":121.070023,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2934},{"i":4006,"cid":"24OB0266","pid":"P00825204LZ","t":"Rehabilitation of Drainage System at Barangay Bagong Ilog, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"W. GOMEZ TRADING AND CONSTRUCTION","c":8601958.42,"abc":8790703.29,"fy":"2024","sd":"04/08/2024","cd":"2024-11-03","lat":14.5703,"lon":121.07005,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2935},{"i":4007,"cid":"24DE0032","pid":"P00821322LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 7), Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":86850000.0,"abc":86850000.0,"fy":"2024","sd":"02/07/2024","cd":"2025-01-25","lat":13.764653,"lon":121.070143,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.07,"wp":[13.76409,121.07038],"wst":"matched","br":null,"len":null,"ph":"Section 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2936},{"i":4008,"cid":"23DE0039","pid":"P00726202LZ","t":"Construction of Flood Control Structure at Barangay Libjo (Section 2), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-26","lat":13.732767,"lon":121.070212,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libjo","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2937},{"i":4009,"cid":"22DI0054","pid":"P00620243LZ","t":"Construction of River Protection Structure at Brgy. Loma, Biñan City, Laguna (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / M.T. MALIUANAG CONSTRUCTION SERVICES","c":96353531.2,"abc":96500000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-16","lat":14.29054,"lon":121.07026,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Loma","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2938},{"i":4010,"cid":"22OB0157","pid":"P00620069LZ","t":"Construction of Slope Protection at Hagonoy Pumping Station Retarding Pond, Taguig City (Package 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION / B. BERNARDO CONST., INC.","c":89794000.76,"abc":94569211.39,"fy":"2022","sd":"02/16/2022","cd":"2022-09-15","lat":14.509944,"lon":121.070611,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2939},{"i":4011,"cid":"23OB0072","pid":"P00725955LZ","t":"Construction of Drainage System at Paseo De Animales (Doroteo to Sgt. De Leon), Barangay Santolan and vicinity, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ANDREW LOUIS CONSTRUCTION AND TRADING","c":13031103.01,"abc":13719838.92,"fy":"2023","sd":"02/06/2023","cd":"2023-12-02","lat":14.61167,"lon":121.08306,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santolan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2940},{"i":4012,"cid":"23DE0041","pid":"P00742387LZ","t":"Construction of Drainage, Barangay Alangilan, Batangas City","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"J.A.B. CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-07-06","lat":13.777715,"lon":121.070668,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alangilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2941},{"i":4013,"cid":"23DD0324","pid":"P00742404LZ","t":"Construction (Completion) of Drainage System, Brgy. Bigain South, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":3841200.0,"abc":3960000.0,"fy":"2023","sd":"09/29/2023","cd":"2023-12-31","lat":13.88368,"lon":121.07162,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bigain South","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2942},{"i":4014,"cid":"22OD0074","pid":"P00631031LZ","t":"Construction of Flood Control Structure, Brgy. 179, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AYLAN CONSTRUCTION & TRADING","c":19205803.61,"abc":19597779.65,"fy":"2022","sd":"02/08/2022","cd":"2022-10-05","lat":14.753911,"lon":121.071633,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"179","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2943},{"i":4015,"cid":"22CD0214","pid":"P00637074LZ","t":"Construction of Flood Control Structures, North Diamond, Barangay Maharlika, City of San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":38609812.08,"abc":39199364.55,"fy":"2022","sd":"05/26/2022","cd":"2022-10-17","lat":14.79448,"lon":121.07189,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maharlika","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2944},{"i":4016,"cid":"22OB0105","pid":"P00620052LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 4, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":91587933.55,"abc":96499771.95,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.527658,"lon":121.072051,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.01,"wp":[14.52779,121.07205],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[4729,4037,4039,4862,4000,4066,4077,4031,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":337},{"i":4017,"cid":"22CD0201","pid":"P00637073LZ","t":"Construction of Drainage Structure, Diamond Crest, Barangay San Manuel, City of San Jose del Monte, Bulacan","w":"Construction of Drainage Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FORTUNE RDC ENTERPRISES","c":29363263.96,"abc":29691735.0,"fy":"2022","sd":"05/26/2022","cd":"2023-12-18","lat":14.78003,"lon":121.07212,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Manuel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2945},{"i":4018,"cid":"24OB0181","pid":"P00821059LZ","t":"Construction of Slope Protection Along Pateros River, (Phase 2), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":70926646.27,"abc":72374128.85,"fy":"2024","sd":"02/13/2024","cd":"2024-08-16","lat":14.516928,"lon":121.072376,"sm":1521,"fm":1112,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Pateros","wn":"Pateros River","wd":2.1,"wp":[14.53269,121.06146],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2946},{"i":4019,"cid":"23DC0048","pid":"P00737495LZ","t":"Rehabilitation of Canal at Barangay 1, Mataasnakahoy, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"PRIME MOVER'S PHILS. CONSTRUCTION AND SUPPLIES INC.","c":4949253.0,"abc":4950000.0,"fy":"2023","sd":"02/03/2023","cd":"2023-06-02","lat":13.95679,"lon":121.1113,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2947},{"i":4020,"cid":"23OB0238","pid":"P00742230LZ","t":"River Improvement along Nangka River Phase 2, Nangka River, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":46526327.8,"abc":48999621.22,"fy":"2023","sd":"05/24/2023","cd":"2024-01-18","lat":14.658245,"lon":121.134732,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.65827,121.13483],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2948},{"i":4021,"cid":"24OG0011","pid":"P00839530LZ","t":"Construction of Retaining Wall, Barangay Libis, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":19206242.7,"abc":19799991.63,"fy":"2024","sd":"02/08/2024","cd":"2025-01-22","lat":14.61544,"lon":121.07245,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2949},{"i":4022,"cid":"22OB0075","pid":"P00620087LZ","t":"Rehabilitation of Pasig-Marikina River Channel, Brgy. Bagong Ilog and Brgy. Kapasigan, Pasig City","w":"Construction of Revetment","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":93099243.36,"abc":97999911.32,"fy":"2022","sd":"05/16/2022","cd":"2023-01-10","lat":14.55982,"lon":121.07247,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagong Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2950},{"i":4023,"cid":"22DI0059","pid":"P00631302LZ","t":"Construction of River Protection Structures at Barangay Loma (near Barangay Hall), Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"AARCON BUILDERS","c":28769662.5,"abc":29400000.0,"fy":"2022","sd":"03/09/2022","cd":"2023-07-19","lat":14.29376,"lon":121.07257,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Loma","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2951},{"i":4024,"cid":"22OB0093","pid":"P00620016LZ","t":"Construction / Rehabilitation of Drainage System Along M. Almeda St. And Vicinity, Pateros Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":96500000.0,"abc":96499382.34,"fy":"2022","sd":"03/21/2022","cd":"2023-06-21","lat":14.549381,"lon":121.072619,"sm":1521,"fm":1521,"tm":null,"am":1112,"md":0.59,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2952},{"i":4025,"cid":"22OG0084","pid":"P00637762LZ","t":"Construction of Retaining Wall at Libis Elementary School (Phase 1), Barangay Libis, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"SONPRO CONSTRUCTION","c":24733928.89,"abc":24737643.5,"fy":"2022","sd":"03/24/2022","cd":"2023-04-15","lat":14.61557,"lon":121.07284,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libis","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2953},{"i":4026,"cid":"22DI0055","pid":"P00620244LZ","t":"Construction of River Protection Structure at Brgy. Loma, Biñan City, Laguna (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96405046.39,"abc":96500000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-16","lat":14.29284,"lon":121.07295,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Loma","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2954},{"i":4027,"cid":"23DE0038","pid":"P00726201LZ","t":"Construction of Flood Control Structure at Barangay Libjo (Section 1), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-06-22","lat":13.74088,"lon":121.07299,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libjo","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2955},{"i":4028,"cid":"22DE0038","pid":"P00631287LZ","t":"Construction of Flood Control Structures along Tangisan to Takad River, Libjo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-28","lat":13.74206,"lon":121.073069,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Takad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2956},{"i":4029,"cid":"24DE0031","pid":"P00821323LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 8), Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":86850000.0,"abc":86850000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-11-14","lat":13.764469,"lon":121.073097,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.07,"wp":[13.76505,121.073],"wst":"matched","br":null,"len":null,"ph":"Section 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2957},{"i":4030,"cid":"23DE0086","pid":"P00727369LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 5), Batangas City, Phase 2","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":34300000.0,"abc":34300000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-05","lat":13.764528,"lon":121.073133,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.06,"wp":[13.76506,121.07305],"wst":"matched","br":null,"len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2958},{"i":4031,"cid":"22OB0108","pid":"P00620055LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 5, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":94190038.78,"abc":96499739.19,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.526784,"lon":121.073137,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.02,"wp":[14.52683,121.07329],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[4729,4037,4039,4862,4000,4016,4066,4077,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":338},{"i":4032,"cid":"22OB0095","pid":"P00620359LZ","t":"Construction of Drainage System Including Laterals at Brgy. Sta. Ana, Pateros, Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JAYMAR BUILDERS","c":18619388.58,"abc":19599841.24,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":14.543801,"lon":121.073204,"sm":1112,"fm":1521,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Ana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2959},{"i":4033,"cid":"22OB0109","pid":"P00620056LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 6, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96499551.09,"fy":"2022","sd":"03/24/2022","cd":"2022-11-18","lat":14.525534,"lon":121.07337,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.02,"wp":[14.52553,121.07357],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[4729,4037,4039,4862,4000,4016,4066,4077,4031],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":210},{"i":4034,"cid":"23DE0019","pid":"P00726204LZ","t":"Construction of Flood Control Structure at Barangay San Isidro (Section 2), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-27","lat":13.737826,"lon":121.073421,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2960},{"i":4035,"cid":"23OG0055","pid":"P00726024LZ","t":"Rehabilitation of Drainage System, Barangay Saint Ignatius, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"4 DOUBLERS TRADING & CONTRACTOR INC. (FORMERLY: 4 DOUBLERS TRADING AND CONTRACTOR)","c":5644713.81,"abc":5879910.17,"fy":"2023","sd":"03/13/2023","cd":"2023-06-07","lat":14.61264,"lon":121.07344,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Saint Ignatius","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2961},{"i":4036,"cid":"24CD0057","pid":"P00820211LZ","t":"Construction of Flood Control Structure along San Jose River (Bigte-Ipo Dam Road), San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498767.65,"abc":96499701.93,"fy":"2024","sd":"02/22/2024","cd":"2024-10-04","lat":14.77255,"lon":121.073489,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"San Jose","wn":"San Jose Creek","wd":23.19,"wp":[14.56441,121.04834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2962},{"i":4037,"cid":"22OB0101","pid":"P00620048LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 3, Taguig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"AARCON BUILDERS","c":91577975.1,"abc":96499446.79,"fy":"2022","sd":"02/16/2022","cd":"2022-12-12","lat":14.52661,"lon":121.073509,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.01,"wp":[14.52657,121.07338],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[4729,4039,4862,4000,4016,4066,4077,4031,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":339},{"i":4038,"cid":"23OD0074","pid":"P00725557LZ","t":"Construction of Flood Control Wall along Sampaguita Creek, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":89280149.46,"abc":91666256.9,"fy":"2023","sd":"02/21/2023","cd":"2023-12-25","lat":14.77232,"lon":121.073531,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Sampaguita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2963},{"i":4039,"cid":"22OB0102","pid":"P00620049LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 4, Taguig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":91597421.64,"abc":96499601.39,"fy":"2022","sd":"02/16/2022","cd":"2022-12-12","lat":14.52515,"lon":121.073677,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.01,"wp":[14.52515,121.07356],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[4729,4037,4862,4000,4016,4066,4077,4031,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":340},{"i":4040,"cid":"24OG0007","pid":"P00820644LZ","t":"Rehabilitation of Drainage System, Barangay Ugong Norte, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MANCOL CONSTRUCTION CORPORATION","c":19598981.58,"abc":19599381.58,"fy":"2024","sd":"02/08/2024","cd":"2024-08-06","lat":14.596634,"lon":121.073775,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ugong Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2964},{"i":4041,"cid":"23OF0044","pid":"P00736169LZ","t":"Construction of Flood Control Structure at La Mesa Ecopark, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":48019525.44,"abc":48999515.75,"fy":"2023","sd":"03/07/2023","cd":"2023-12-20","lat":14.710635,"lon":121.073809,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2965},{"i":4042,"cid":"23OB0080","pid":"P00725969LZ","t":"Rehabilitation of Drainage System along Pilapil St., Barangay Kapasigan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"E.S. JOSEFA CONSTRUCTION","c":11154489.46,"abc":11759884.45,"fy":"2023","sd":"02/06/2023","cd":"2023-06-20","lat":14.564444,"lon":121.073889,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kapasigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2966},{"i":4043,"cid":"23DE0018","pid":"P00726203LZ","t":"Construction of Flood Control Structure at Barangay San Isidro (Section 1), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-27","lat":13.736864,"lon":121.073931,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2967},{"i":4044,"cid":"21OG0138","pid":"P00525840LZ","t":"Construction/Rehabilitation of Flood Control Structures at Lumban Creek, Barangay Matandang Balara, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 2nd District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":48985157.08,"abc":48999704.88,"fy":"2021","sd":"11/10/2021","cd":"2022-10-15","lat":14.670922,"lon":121.074008,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lumban","wn":"Lumban Creek","wd":1.57,"wp":[14.66868,121.08841],"wst":"matched","br":"Matandang Balara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2968},{"i":4045,"cid":"23OB0103","pid":"P00726631LZ","t":"Bank Improvement of Slope Protection along Marikina River (Package 7), Pasig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":46475997.28,"abc":48999977.0,"fy":"2023","sd":"02/06/2023","cd":"2025-02-18","lat":14.566771,"lon":121.074149,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.05,"wp":[14.56686,121.07368],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2969},{"i":4046,"cid":"24OG0021","pid":"P00820649LZ","t":"Rehabilitation of Marikina River Tributary Creek (Phase 2), Acropolis, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":48998985.53,"abc":48999386.53,"fy":"2024","sd":"02/08/2024","cd":"2024-12-23","lat":14.601757,"lon":121.074194,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.88,"wp":[14.60179,121.08235],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2970},{"i":4047,"cid":"23OG0072","pid":"P00727031LZ","t":"Rehabilitation of Marikina River Tributary Creek, Acropolis, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":9755779.9,"abc":9799377.16,"fy":"2023","sd":"03/29/2023","cd":"2024-01-05","lat":14.60127,"lon":121.07422,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.88,"wp":[14.60175,121.08236],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2971},{"i":4048,"cid":"23OB0102","pid":"P00726322LZ","t":"Bank Improvement of Slope Protection along Marikina River (Package 6), Pasig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":92869777.58,"abc":97999637.65,"fy":"2023","sd":"03/15/2023","cd":"2024-06-03","lat":14.567472,"lon":121.074293,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.05,"wp":[14.56756,121.07381],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2972},{"i":4049,"cid":"24OB0174","pid":"P00821052LZ","t":"Construction of Slope Protection along Panday River, (Phase 10), Pateros","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":70920109.96,"abc":72374844.34,"fy":"2024","sd":"02/13/2024","cd":"2024-06-17","lat":14.543264,"lon":121.074328,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 10","dup":[],"run":[4063,4053,4058,4057],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24OB0174 to 24OB0179) cover the same site, together worth PHP 354,622,273.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":436},{"i":4050,"cid":"22DE0074","pid":"P00637787LZ","t":"Construction of Flood Control Structures along Tangisan to Takad River, Brgy. San Isidro, Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":39600000.0,"abc":39600000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-04","lat":13.736164,"lon":121.074603,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Takad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2973},{"i":4051,"cid":"23DD0257","pid":"P00742411LZ","t":"Construction of Drainage System, Brgy. Bagong Pook, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"05/19/2023","cd":"2023-10-20","lat":13.8437,"lon":121.07468,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Pook","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2974},{"i":4052,"cid":"23OG0078","pid":"P00727032LZ","t":"Rehabilitation of Drainage System, Barangay Blue Ridge B, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"4 DOUBLERS TRADING & CONTRACTOR INC. (FORMERLY: 4 DOUBLERS TRADING AND CONTRACTOR)","c":11755099.54,"abc":11759509.17,"fy":"2023","sd":"05/31/2023","cd":"2024-06-24","lat":14.61754,"lon":121.07498,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Blue Ridge B","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2975},{"i":4053,"cid":"24OB0177","pid":"P00821055LZ","t":"Construction of Slope Protection along Panday River, (Phase 7), Pateros, Metro Manila","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":70920498.2,"abc":72374544.08,"fy":"2024","sd":"02/13/2024","cd":"2024-08-26","lat":14.543456,"lon":121.07506,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[4049,4063,4058,4057],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24OB0174 to 24OB0179) cover the same site, together worth PHP 354,622,273.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":437},{"i":4054,"cid":"20D00058","pid":"P00421352LZ","t":"Construction of Detention Pond at Brgy. Mamplasan including Outfall Leading to Tributary Creek of Carmona-Biñan River, Biñan City, Laguna","w":"Construction of Flood Mitigation Facility","rg":"Region IV-A","pv":"LAGUNA","mu":"City of Biñan","deo":"Laguna 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":103385143.3,"abc":106878575.0,"fy":"2020","sd":"11/26/2020","cd":"2022-12-19","lat":14.30557,"lon":121.0751,"sm":371,"fm":null,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Carmona-Biñan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mamplasan including Outfall Leading","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2976},{"i":4055,"cid":"20D00058","pid":"P00421352LZ","t":"Construction of Detention Pond at Brgy. Mamplasan including Outfall Leading to Tributary Creek of Carmona-Biñan River, Biñan City, Laguna","w":"Construction of Flood Mitigation Facility","rg":"Region IV-A","pv":"LAGUNA","mu":"City of Biñan","deo":"Laguna 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":103385143.3,"abc":106878575.0,"fy":"2021","sd":"11/26/2020","cd":"2022-12-19","lat":14.30557,"lon":121.0751,"sm":371,"fm":null,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Carmona-Biñan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mamplasan including Outfall Leading","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2977},{"i":4056,"cid":"22DE0061","pid":"P00637789LZ","t":"Construction of Slope Protection, Brgy. Libjo, Batangas City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-17","lat":13.743478,"lon":121.075182,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libjo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2978},{"i":4057,"cid":"24OB0179","pid":"P00821057LZ","t":"Construction of Slope Protection along Panday River, (Phase 9), Pateros","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":70927423.27,"abc":72374921.71,"fy":"2024","sd":"02/13/2024","cd":"2024-08-26","lat":14.543915,"lon":121.075346,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 9","dup":[],"run":[4049,4063,4053,4058],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24OB0174 to 24OB0179) cover the same site, together worth PHP 354,622,273.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":438},{"i":4058,"cid":"24OB0178","pid":"P00821056LZ","t":"Construction of Slope Protection along Panday River, (Phase 8), Pateros, Metro Manila","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"EBUILDERS CONSTRUCTION & DEVELOPMENT CORP.","c":70927211.05,"abc":72374705.15,"fy":"2024","sd":"02/13/2024","cd":"2024-06-25","lat":14.544951,"lon":121.075843,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 8","dup":[],"run":[4049,4063,4053,4057],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24OB0174 to 24OB0179) cover the same site, together worth PHP 354,622,273.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":439},{"i":4059,"cid":"24CD0174","pid":"P00844751LZ","t":"Construction of Flood Control Structure, Barangay Tungkong Mangga, San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":29394604.89,"abc":29399636.87,"fy":"2024","sd":"04/30/2024","cd":"2024-09-06","lat":14.796881,"lon":121.07603,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tungkong Mangga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2979},{"i":4060,"cid":"23OG0088","pid":"P00727033LZ","t":"Rehabilitation of Drainage System, Barangay Old Balara, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"4 DOUBLERS TRADING & CONTRACTOR INC. (FORMERLY: 4 DOUBLERS TRADING AND CONTRACTOR)","c":6858041.84,"abc":6859417.44,"fy":"2023","sd":"04/28/2023","cd":"2023-12-06","lat":14.6669,"lon":121.07632,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Old Balara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2980},{"i":4061,"cid":"23OG0021","pid":"P00726029LZ","t":"Rehabilitation of Drainage System, Barangay Libis, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MANCOL CONSTRUCTION CORPORATION","c":19415450.52,"abc":19599989.18,"fy":"2023","sd":"02/17/2023","cd":"2024-01-12","lat":14.614721,"lon":121.076413,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2981},{"i":4062,"cid":"23DD0137","pid":"P00742406LZ","t":"Construction (Completion) of Drainage System, Brgy. Lepute, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":3841200.0,"abc":3960000.0,"fy":"2023","sd":"04/02/2023","cd":"2023-10-02","lat":13.88935,"lon":121.07646,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lepute","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2982},{"i":4063,"cid":"24OB0175","pid":"P00821053LZ","t":"Construction of Slope Protection along Panday River, (Phase 5), Pateros","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":70927030.3,"abc":72374953.0,"fy":"2024","sd":"02/13/2024","cd":"2024-06-25","lat":14.545381,"lon":121.076557,"sm":1112,"fm":1112,"tm":1112,"am":1521,"md":0.01,"ls":"boundary","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[4049,4053,4058,4057],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":5,"text":"5 contracts with consecutive numbers (24OB0174 to 24OB0179) cover the same site, together worth PHP 354,622,273.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":440},{"i":4064,"cid":"23OF0059","pid":"P00726016LZ","t":"Construction of Flood Control Structure and Tributaries at Barangay Holy Spirit, Quezon City (Phase 8)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48509693.6,"abc":48999690.5,"fy":"2023","sd":"03/07/2023","cd":"2023-12-29","lat":14.685183,"lon":121.076561,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Holy Spirit","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2983},{"i":4065,"cid":"21DI0029","pid":"P00561779LZ","t":"Construction of Lined Canal, Barangay Sto Tomas, Biñan, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"City of Biñan","deo":"Laguna 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":38012519.5,"abc":39600000.0,"fy":"2021","sd":"02/10/2021","cd":"2022-07-13","lat":14.333722,"lon":121.076706,"sm":371,"fm":null,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Lined","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2984},{"i":4066,"cid":"22OB0106","pid":"P00620053LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 5, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96499865.17,"fy":"2022","sd":"03/24/2022","cd":"2023-01-11","lat":14.523614,"lon":121.077101,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.03,"wp":[14.52335,121.07708],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[4729,4037,4039,4862,4000,4016,4077,4031,4033],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":211},{"i":4067,"cid":"23BI0016","pid":"P00726143LZ","t":"Rehabilitation of Flood Control along Sta. Cruz River, Aliaga Section, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":46531853.34,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-21","lat":16.382969,"lon":121.077111,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.39,"wp":[16.38514,121.07423],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2985},{"i":4068,"cid":"23BI0027","pid":"P00726709LZ","t":"Rehabilitation of Flood Control Structure along Santa Fe River, Indiana Section, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"CITRUS COUNTRY CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-09-17","lat":16.329661,"lon":121.077111,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Santa Fe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2986},{"i":4069,"cid":"23DD0138","pid":"P00742418LZ","t":"Construction (Completion) of Riprap, Brgy. Bigain I, San Jose, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":2880900.0,"abc":2970000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-06-03","lat":13.88483,"lon":121.07714,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bigain I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2987},{"i":4070,"cid":"22OF0023","pid":"P00620442LZ","t":"Construction of Flood Control Structure and Tributaries along Culiat Creek (Right Side) Barangay Bahay Toro, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":42772590.0,"abc":44100000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-10-21","lat":14.697418,"lon":121.077329,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Culiat","wn":"Culiat Creek","wd":5.07,"wp":[14.66502,121.04409],"wst":"matched","br":"Bahay Toro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.07,"text":"The title names Culiat, which OpenStreetMap maps through the stated municipality, but the pin is 5.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":355},{"i":4071,"cid":"22OB0155","pid":"P00620357LZ","t":"Bank Improvement/Protection along Panday River (West Bank), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":48999982.49,"abc":48999830.59,"fy":"2022","sd":"02/08/2022","cd":"2022-09-22","lat":14.544724,"lon":121.077482,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Panday","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2988},{"i":4072,"cid":"24OG0020","pid":"P00820648LZ","t":"Rehabilitation of Libis Creek, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":9790929.75,"abc":9799106.59,"fy":"2024","sd":"02/08/2024","cd":"2024-04-22","lat":14.615278,"lon":121.078063,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Libis","wn":"Libis Creek","wd":0.97,"wp":[14.60665,121.07639],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2989},{"i":4073,"cid":"21PC0019","pid":"P00526368LZ","t":"Construction of Cabicungan Flood Control Structure, Sta. 13 + 580 - Sta. 13 + 605 (L/S), Sta 13+180-Sta 13+280 (L/S), Sta 13+460-Sta 13+510 (R/S), Sta 13+230-Sta 13+430 (R/S), Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Calanasan","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":47521251.3,"abc":49000000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-11-24","lat":18.5118,"lon":121.07829,"sm":294,"fm":null,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2990},{"i":4074,"cid":"23PC0046","pid":"P00735961LZ","t":"Construction of Flood Control Structure along Apayao River Basin, Namaltugan Section, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"TAGEL CORPORATION / E.C.V. CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-03-11","lat":18.13243,"lon":121.07831,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":0.27,"wp":[18.13462,121.07934],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2991},{"i":4075,"cid":"23DD0162","pid":"P00742409LZ","t":"Construction of Box Culvert, Brgy. Lalayat-Brgy. Tugtug, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":10563300.0,"abc":10890000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-07-27","lat":13.8639,"lon":121.07846,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lalayat-Brgy. Tugtug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2992},{"i":4076,"cid":"24OB0173","pid":"P00824795LZ","t":"Construction of Slope Protection along Sta. Ana River, Taguig City (Phase 1)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION / RVDP CONSTRUCTION","c":94568457.67,"abc":96499747.94,"fy":"2024","sd":"04/01/2024","cd":"2024-10-03","lat":14.527304,"lon":121.078787,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2993},{"i":4077,"cid":"22OB0107","pid":"P00620054LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 6, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":91626371.52,"abc":96499601.39,"fy":"2022","sd":"03/24/2022","cd":"2022-10-10","lat":14.523389,"lon":121.079028,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.02,"wp":[14.52317,121.079],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[4729,4037,4039,4862,4000,4016,4066,4031,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":341},{"i":4078,"cid":"23OF0061","pid":"P00726021LZ","t":"Construction of Flood Control Structure at Barangay Commonwealth, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":48999637.4,"fy":"2023","sd":"03/07/2023","cd":"2023-12-29","lat":14.694643,"lon":121.079338,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Commonwealth","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2994},{"i":4079,"cid":"23OG0024","pid":"P00726028LZ","t":"Rehabilitation of Drainage System, Barangay Bagumbayan, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":29381895.44,"abc":29399717.27,"fy":"2023","sd":"02/17/2023","cd":"2023-09-14","lat":14.612559,"lon":121.07952,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2995},{"i":4080,"cid":"22DI0107","pid":"P00640556LZ","t":"Construction of Revetment/Riverwall at Binan River (Phase 2) (staggered) near Barangay San Vicente, Binan City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49472556.72,"abc":49500000.0,"fy":"2022","sd":"07/05/2022","cd":"2023-08-04","lat":14.32917,"lon":121.07998,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Binan","wn":"Biñan River","wd":0.01,"wp":[14.3291,121.08005],"wst":"matched","br":"San Vicente","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2996},{"i":4081,"cid":"23OB0433","pid":"P00726820LZ","t":"Construction of Slope Protection at Taguig River Laguna Lakeshore, Taguig City, Phase I","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":91578156.14,"abc":96499637.67,"fy":"2023","sd":"04/19/2023","cd":"2023-09-15","lat":14.520105,"lon":121.08002,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.03,"wp":[14.52023,121.08023],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[4095,4097],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0433 to 23OB0435) cover the same site, together worth PHP 274,869,252.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":342},{"i":4082,"cid":"21PC0067","pid":"P00561270LZ","t":"Construction of Sta. Filomena Floodway/ Flood Control Structure,  Sta. Filomena,  Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Calanasan","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-12-15","lat":18.53566,"lon":121.0802,"sm":294,"fm":null,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Sta. Filomena","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2997},{"i":4083,"cid":"23OD0138","pid":"P00740300LZ","t":"Construction of Flood Control Wall along Sapang Alat Creek, Sta. 3+296 to 3+648, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":94021597.95,"abc":96473103.47,"fy":"2023","sd":"04/24/2023","cd":"2023-12-12","lat":14.773098,"lon":121.080419,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Sapang Alat","wn":"Sapang Alat","wd":12.64,"wp":[14.7762,120.96309],"wst":"matched","br":null,"len":352.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2998},{"i":4084,"cid":"24CD0052","pid":"P00820235LZ","t":"Construction of Flood Control Structure, Towerville, Barangay Minuyan Proper, San Jose del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":68844853.57,"abc":68877359.15,"fy":"2024","sd":"02/14/2024","cd":"2024-12-19","lat":14.837483,"lon":121.080436,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Minuyan Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":2999},{"i":4085,"cid":"24OB0096","pid":"P00824595LZ","t":"Rehabilitation of Drainage System and Vicinity at Barangay Sta. Cruz, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":9633293.79,"abc":9799886.09,"fy":"2024","sd":"04/08/2024","cd":"2024-07-10","lat":14.56407,"lon":121.08045,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3000},{"i":4086,"cid":"22DI0043","pid":"P00632898LZ","t":"Construction of Flood Mitigation Structure, Barangay Sto. Tomas, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":49494593.92,"abc":49500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-08-16","lat":14.32912,"lon":121.08059,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3001},{"i":4087,"cid":"24OB0084","pid":"P00823657LZ","t":"Rehabilitation of Drainage System at C. Santos St. and F. Legaspi St., Barangay Ugong, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"GH BELANDRES CONSTRUCTORS INC","c":19284028.41,"abc":19599815.46,"fy":"2024","sd":"04/08/2024","cd":"2024-09-19","lat":14.582361,"lon":121.080639,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ugong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3002},{"i":4088,"cid":"23OB0092","pid":"P00725941LZ","t":"Rehabilitation of Flood Mitigation Structure, Daang Paa Creek at Barangay San Joaquin and Kalawaan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":7442044.02,"abc":7838779.56,"fy":"2023","sd":"02/06/2023","cd":"2023-07-20","lat":14.546944,"lon":121.080833,"sm":412,"fm":412,"tm":412,"am":1521,"md":0.0,"ls":"inside","ww":"Daang Paa","wn":"Daang Paa Creek","wd":0.01,"wp":[14.54699,121.08087],"wst":"matched","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3003},{"i":4089,"cid":"21OD0188","pid":"P00525793LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Brgy. 184, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":19148711.92,"abc":19599514.87,"fy":"2021","sd":"03/24/2022","cd":"2022-08-16","lat":14.77112,"lon":121.08097,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"184","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3004},{"i":4090,"cid":"24OB0187","pid":"P00821070LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 1), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":141811101.2,"abc":144749516.3,"fy":"2024","sd":"05/29/2024","cd":"2024-09-11","lat":14.519699,"lon":121.081013,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[4091,4092],"run":[4091,4092,4682,4669,4643,4504,4453],"cl":[],"L":"field","s":62,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 425,447,844.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":17},{"i":4091,"cid":"24OB0188","pid":"P00821071LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 2), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":141782110.5,"abc":144749474.8,"fy":"2024","sd":"06/04/2024","cd":"2024-11-15","lat":14.519699,"lon":121.081013,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[4090,4092],"run":[4090,4092,4682,4669,4643,4504,4453],"cl":[],"L":"field","s":62,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 425,447,844.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":18},{"i":4092,"cid":"24OB0189","pid":"P00821072LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 3), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J. SIMEON CONSTRUCTION","c":141854632.5,"abc":144749625.0,"fy":"2024","sd":"05/29/2024","cd":"2024-09-11","lat":14.519699,"lon":121.081013,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[4090,4091],"run":[4090,4091,4682,4669,4643,4504,4453],"cl":[],"L":"field","s":63,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 425,447,844.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":15},{"i":4093,"cid":"22DI0106","pid":"P00637082LZ","t":"Construction of Riverwall, Biñan River near Barangay San Vicente (Staggered), Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48994072.94,"abc":49000000.0,"fy":"2022","sd":"07/05/2022","cd":"2023-08-19","lat":14.33008,"lon":121.08111,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Biñan","wn":"Biñan River","wd":0.01,"wp":[14.33002,121.08115],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3005},{"i":4094,"cid":"22BI0020","pid":"P00621072LZ","t":"Rehabilitation of Flood Control/Drainage Structure along Matuno River, San Leonardo Section, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-20","lat":16.395591,"lon":121.081345,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Matuno","wn":"Matuno River","wd":0.08,"wp":[16.39634,121.08141],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3006},{"i":4095,"cid":"23OB0434","pid":"P00726821LZ","t":"Construction of Slope Protection at Taguig River Laguna Lakeshore, Taguig City, Phase II","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":91674420.38,"abc":96499389.87,"fy":"2023","sd":"04/19/2023","cd":"2023-08-01","lat":14.518974,"lon":121.081364,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.03,"wp":[14.51909,121.0816],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[4081,4097],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0433 to 23OB0435) cover the same site, together worth PHP 274,869,252.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":343},{"i":4096,"cid":"24OF0127","pid":"P00848596LZ","t":"Construction of Flood Control Structure and Tributaries, Brgy. Commonwealth, Quezon City (Phase 8)","w":"Construction of Revetment","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":53796440.8,"abc":54449842.5,"fy":"2024","sd":"03/18/2024","cd":"2024-12-02","lat":14.694959,"lon":121.081521,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Commonwealth","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3007},{"i":4097,"cid":"23OB0435","pid":"P00726822LZ","t":"Construction of Slope Protection at Taguig River Laguna Lakeshore, Taguig City, Phase III","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":91616675.48,"abc":96499552.85,"fy":"2023","sd":"04/19/2023","cd":"2023-08-01","lat":14.518072,"lon":121.081949,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.02,"wp":[14.51816,121.08209],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[4081,4095],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0433 to 23OB0435) cover the same site, together worth PHP 274,869,252.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":344},{"i":4098,"cid":"22DI0041","pid":"P00631303LZ","t":"Construction of River Protection Structures at Barangay Sto.Tomas and Barangay Sto. Nino, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"AARCON BUILDERS","c":28819391.0,"abc":29400000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-02","lat":14.32274,"lon":121.08197,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto.Tomas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3008},{"i":4099,"cid":"23OD0139","pid":"P00740301LZ","t":"Construction of Flood Control Wall along Sapang Alat Creek, Sta. 3+996 to 4+346, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":93966981.03,"abc":96478557.39,"fy":"2023","sd":"04/24/2023","cd":"2023-12-26","lat":14.774571,"lon":121.082093,"sm":308,"fm":308,"tm":308,"am":416,"md":0.0,"ls":"inside","ww":"Sapang Alat","wn":"Sapang Alat","wd":12.82,"wp":[14.7762,120.96309],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3009},{"i":4100,"cid":"22OG0007","pid":"P00632722LZ","t":"Construction of Drainage System at Barangay Pansol, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ANN-GIE BUILDERS","c":4742519.0,"abc":4949691.14,"fy":"2022","sd":"02/09/2022","cd":"2022-09-19","lat":14.652444,"lon":121.082278,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pansol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3010},{"i":4101,"cid":"23E00166","pid":"P00740429LZ","t":"Construction of Dike along Dulangan River, Paetan Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":241246568.6,"abc":241249991.7,"fy":"2023","sd":"04/13/2023","cd":"2023-10-15","lat":13.2707,"lon":121.0825,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":0.01,"wp":[13.27072,121.08241],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3011},{"i":4102,"cid":"23DC0079","pid":"P00737496LZ","t":"Construction of Lakewall, Barangay Lumang Lipa, Mataasnakahoy, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"R.B. ABITAL CONSTRUCTION CORP.","c":4938291.5,"abc":4950000.0,"fy":"2023","sd":"02/03/2023","cd":"2023-07-10","lat":13.971975,"lon":121.08266,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumang Lipa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3012},{"i":4103,"cid":"23DC0082","pid":"P00742393LZ","t":"Construction of Lakewall Protection, Brgy. Lumanglipa, Mataas na Kahoy","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"THREE W BUILDERS, INC.","c":9896963.8,"abc":9900000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-10-16","lat":13.970834,"lon":121.082832,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumanglipa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3013},{"i":4104,"cid":"22PC0034","pid":"P00620989LZ","t":"Construction of Cabicungan River Basin Flood Control Structure, Dappay Section, Sta. 11 + 470 - Sta. 12 + 090 (R/S), Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-12-12","lat":18.52789,"lon":121.08297,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":4.79,"wp":[18.57079,121.08876],"wst":"matched","br":null,"len":620.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3014},{"i":4105,"cid":"23OB0088","pid":"P00725973LZ","t":"Rehabilitation of Flood Control Structure along Buli Creek, Pasig City Phase II","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":46535105.0,"abc":48999794.64,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.61667,"lon":121.083056,"sm":412,"fm":412,"tm":null,"am":412,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli Creek","wd":4.97,"wp":[14.57581,121.10213],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.97,"text":"The title names Buli, which OpenStreetMap maps through the stated municipality, but the pin is 5.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":356},{"i":4106,"cid":"21PM0004","pid":"P00525919LZ","t":"Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.),  Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Paracelis","deo":"Mountain Province 2nd District Engineering Office","co":"J.M. DAPING CONSTRUCTION SERVICES","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"04/06/2022","cd":"2022-08-19","lat":17.14611,"lon":121.34028,"sm":1102,"fm":null,"tm":1102,"am":1016,"md":2.17,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":385.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3015},{"i":4107,"cid":"24OB0108","pid":"P00821439LZ","t":"Improvement of Slope Protection along Buli Creek, Phase 2, Pasig City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":47524950.0,"abc":48999654.52,"fy":"2024","sd":"02/12/2024","cd":"2024-08-05","lat":14.569258,"lon":121.09688,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli Creek","wd":0.79,"wp":[14.57524,121.10092],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3016},{"i":4108,"cid":"23DD0184","pid":"P00742408LZ","t":"Construction of Box Culvert, Brgy. Sabang, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":5761800.0,"abc":5940000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-08-24","lat":13.87148,"lon":121.06024,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3017},{"i":4109,"cid":"22OF0021","pid":"P00620444LZ","t":"Construction of Flood Control Structure and Tributaries along San Francisco River, Phase I, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:LARSEN-DUTCHER CONSTRACTOR)","c":42731523.6,"abc":44052890.46,"fy":"2022","sd":"02/07/2022","cd":"2022-12-05","lat":14.70814,"lon":121.097449,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":10.24,"wp":[14.65285,121.02121],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.69,"value":10.24,"text":"The title names San Francisco, which OpenStreetMap maps through the stated municipality, but the pin is 10.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":313},{"i":4110,"cid":"23OC0016","pid":"P00725531LZ","t":"Construction of Flood Mitigation Structure (Installation of Automatic Trash Screen) at Maya Creek, Barangay Rizal, Makati City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY","c":61469424.33,"abc":62725000.0,"fy":"2023","sd":"07/31/2023","cd":"2024-03-26","lat":14.532571,"lon":121.060878,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Maya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3018},{"i":4111,"cid":"21DO0047","pid":"P00561554LZ","t":"Construction of for Slope Protection of Lagundi River, Barangay Lagundi, Morong, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Morong","deo":"Rizal 2nd District Engineering Office","co":"S.B. SORIANO CONSTRUCTION","c":9553249.64,"abc":9900000.0,"fy":"2021","sd":"12/23/2021","cd":"2022-07-01","lat":14.538,"lon":121.2574,"sm":991,"fm":null,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":"Lagundi","wn":"Lagundi Creek","wd":11.88,"wp":[14.54483,121.14739],"wst":"matched","br":"Lagundi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3019},{"i":4112,"cid":"23PK0071","pid":"P00742292LZ","t":"Construction of Drainage Canal System in Barangay Malucsad (Abis Creek), Pasil, Kalinga and Barangay Balbalasang (Balbalasang Elementary School), Balbalan, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"BALBALAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"RAD CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"05/29/2023","cd":"2023-10-28","lat":17.397766,"lon":121.161388,"sm":125,"fm":125,"tm":125,"am":1108,"md":4.96,"ls":"outside","ww":"Abis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malucsad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.73,"value":4.96,"text":"The pin is 5.0 km outside Balbalan, Kalinga, the nearest municipality the record claims. It falls in Pasil, Kalinga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":357},{"i":4113,"cid":"23PJ0019","pid":"P00725654LZ","t":"Construction of Mapacopaco Flood Control, Sta. 41 + 902 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta. 43 + 527 (RS), Posnaan, Aguinaldo, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"AGUINALDO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"C-BROS CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":57900000.0,"abc":57872873.51,"fy":"2023","sd":"06/05/2023","cd":"2023-11-06","lat":16.975833,"lon":121.3425,"sm":12,"fm":12,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1128.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3020},{"i":4114,"cid":"23OG0026","pid":"P00726025LZ","t":"Construction of Flood Control Structure at Lumban Creek, Barangay Matandang Balara, Quezon City (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48997299.9,"abc":48999989.6,"fy":"2023","sd":"02/17/2023","cd":"2023-09-21","lat":14.668466,"lon":121.097612,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lumban","wn":"Lumban Creek","wd":0.1,"wp":[14.668,121.09682],"wst":"matched","br":"Matandang Balara","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3021},{"i":4115,"cid":"22DD0258","pid":"P00640544LZ","t":"Construction of Drainage System, Barangay Tipacan, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"KEASCIA CONSTRUCTION & SUPPLY","c":6722480.66,"abc":6930000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-19","lat":13.91519,"lon":121.20312,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tipacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3022},{"i":4116,"cid":"22DO0068","pid":"P00639378LZ","t":"Construction of Flood Control Structure along Upper Marikina River (Phase IV, R/S), Brgy. San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PRECIOUS CONSTRUCTION / MM SENAR CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"09/05/2022","cd":"2023-03-27","lat":14.736944,"lon":121.135278,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3023},{"i":4117,"cid":"21OC0049","pid":"P00525766LZ","t":"Construction of Revetment Wall at Barangay Rizal Pumping Station (Downstream Portion), Brgy. Rizal, Makati City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"C.B. TAMPENGCO CONSTRUCTION & SUPPLY","c":21412893.0,"abc":23540000.0,"fy":"2021","sd":"03/22/2022","cd":"2023-01-04","lat":14.5325,"lon":121.061064,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal Pumping Station","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3024},{"i":4118,"cid":"23DI0015","pid":"P00725790LZ","t":"Construction of River Protection Structure along Maulawin Waterways, Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION","c":48231583.13,"abc":48250000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-09-26","lat":14.184129,"lon":121.257943,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3025},{"i":4119,"cid":"22DD0278","pid":"P00640543LZ","t":"Construction of Drainage System at Barangay Lumil, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":4851000.0,"abc":4950000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-07-08","lat":13.8667,"lon":121.08333,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3026},{"i":4120,"cid":"21OB0312","pid":"P00525744LZ","t":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+571.86 to 19+601.86, Left Bank, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":54988500.69,"abc":57899928.9,"fy":"2021","sd":"03/17/2022","cd":"2023-02-09","lat":14.68208,"lon":121.11134,"sm":403,"fm":null,"tm":403,"am":1329,"md":0.88,"ls":"boundary","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":30.0,"ph":"Phase V","dup":[4221],"run":[],"cl":[],"L":"field","s":51,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,769,062.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.53,"value":1832950,"text":"About PHP 1,832,950 per metre over 30 m, versus a median of PHP 139,997 for flood mitigation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":95},{"i":4121,"cid":"22OB0154","pid":"P00620010LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 4), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":89844082.13,"abc":94569381.4,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.532297,"lon":121.097617,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[4147,4137,4132],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OB0151 to 22OB0154) cover the same site, together worth PHP 358,573,044.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":345},{"i":4122,"cid":"23DD0275","pid":"P00742399LZ","t":"Construction of Drainage System in Brgy. Sto. Cristo, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LLEB CONSTRUCTION AND TRADING","c":4802002.04,"abc":4950000.0,"fy":"2023","sd":"06/23/2023","cd":"2024-01-08","lat":13.86821,"lon":121.09768,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Cristo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3027},{"i":4123,"cid":"24OB0086","pid":"P00824585LZ","t":"Rehabilitation of Drainage System at Emerald Valley, Brgy. Dela Paz, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.)","c":4799173.96,"abc":4899523.85,"fy":"2024","sd":"04/08/2024","cd":"2024-06-07","lat":14.619704,"lon":121.097912,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3028},{"i":4124,"cid":"23OB0240","pid":"P00742232LZ","t":"Construction of Drainage Outfall, Second District, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":46525913.61,"abc":48999750.22,"fy":"2023","sd":"05/24/2023","cd":"2023-12-19","lat":14.660294,"lon":121.098055,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3029},{"i":4125,"cid":"24OB0107","pid":"P00821438LZ","t":"Improvement of Slope Protection along Buli Creek, Phase 1, Pasig City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":47524455.0,"abc":48999537.17,"fy":"2024","sd":"02/12/2024","cd":"2024-08-05","lat":14.570089,"lon":121.098354,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli Creek","wd":0.63,"wp":[14.57524,121.10092],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3030},{"i":4126,"cid":"24OB0184","pid":"P00821067LZ","t":"Construction of Slope Protection along Taguig River (Phase 3), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"FRANZCOR TRADING & CONSTRUCTION","c":94567799.19,"abc":96499508.64,"fy":"2024","sd":"02/13/2024","cd":"2024-08-16","lat":14.601586,"lon":121.09852,"sm":1521,"fm":1521,"tm":1521,"am":412,"md":6.09,"ls":"outside","ww":"Taguig","wn":"Taguig River","wd":8.23,"wp":[14.53337,121.06819],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":71,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":6.09,"text":"The pin is 6.1 km outside Taguig City, NCR, Fourth District, the nearest municipality the record claims. It falls in City of Pasig, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.23,"text":"The title names Taguig, which OpenStreetMap maps through the stated municipality, but the pin is 8.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":46},{"i":4127,"cid":"23OB0239","pid":"P00742231LZ","t":"Construction of RCBC Drainage System, Barangay Tumana, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":46535318.28,"abc":48999750.22,"fy":"2023","sd":"03/27/2023","cd":"2024-04-14","lat":14.661524,"lon":121.098532,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3031},{"i":4128,"cid":"24DP0047","pid":"P00838450LZ","t":"Construction of Slope Protection Structure, Phase I, Barangay San Jose, San Pablo City, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SAN PABLO CITY (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"DELPAR CONSTRUCTION & SUPPLIES","c":94087224.79,"abc":96500000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-11-20","lat":14.060499,"lon":121.344266,"sm":1346,"fm":1346,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3032},{"i":4129,"cid":"21PK0034","pid":"P00525937LZ","t":"Construction of Ta-ang Flood Control Sta. 175+230 - Sta. 175+280 (B.S.), Dangtalan, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES","c":4801517.62,"abc":4900000.0,"fy":"2021","sd":"04/10/2022","cd":"2023-03-31","lat":17.38324,"lon":121.16173,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":50.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3033},{"i":4130,"cid":"23OB0408","pid":"P00727230LZ","t":"Improvement Marikina River at Sta. 17 + 490 to Sta. 18 + 510, Marikina City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":93035955.95,"abc":97999643.56,"fy":"2023","sd":"06/09/2023","cd":"2024-02-03","lat":14.66785,"lon":121.098646,"sm":403,"fm":403,"tm":403,"am":1191,"md":0.01,"ls":"boundary","ww":"Marikina","wn":"Marikina River","wd":0.01,"wp":[14.66781,121.09876],"wst":"matched","br":null,"len":1020.0,"ph":null,"dup":[],"run":[4670,4971],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0406 to 23OB0408) cover the same site, together worth PHP 279,083,453.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":346},{"i":4131,"cid":"22OB0198","pid":"P00632710LZ","t":"Rehabilitation of Road Dike at Barangay Malanday, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":46522147.58,"abc":48999627.93,"fy":"2022","sd":"02/08/2022","cd":"2023-01-14","lat":14.650644,"lon":121.098811,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malanday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3034},{"i":4132,"cid":"22OB0153","pid":"P00620009LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 3), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J.C. UYECIO CONSTRUCTION AND DEVELOPMENT COMPANY / A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":89841032.41,"abc":94569723.96,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.533095,"lon":121.098864,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[4147,4137,4121],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OB0151 to 22OB0154) cover the same site, together worth PHP 358,573,044.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":347},{"i":4133,"cid":"23OB0083","pid":"P00727007LZ","t":"Rehabilitation of Drainage System at Ilugin and Vicinity, Barangay Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":4653250.0,"abc":4899697.49,"fy":"2023","sd":"05/23/2023","cd":"2023-08-20","lat":14.551973,"lon":121.098918,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4189,4981,4854,4190,4161],"cl":[4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":212},{"i":4134,"cid":"24EB0037","pid":"P00820968LZ","t":"Construction of Mangarin Flood Control Structure, Barangay Mangarin, San Jose, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / MIGHTY DRAGON BUILDERS INC.","c":48997765.82,"abc":49000000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-05-15","lat":12.352764,"lon":121.099381,"sm":1305,"fm":1300,"tm":1305,"am":1305,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mangarin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":298.16,"text":"The record contradicts itself: the title and the pin point to San Jose, Occidental Mindoro, but the municipality field names San Jose, Camarines Sur, 298 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":517},{"i":4135,"cid":"23OB0087","pid":"P00725949LZ","t":"Rehabilitation of Drainage System including Site Development at Brgy. Manggahan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":9306350.0,"abc":9799369.38,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.60306,"lon":121.09944,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3035},{"i":4136,"cid":"23OB0403","pid":"P00726790LZ","t":"Construction of Drainage System, Brgy. Tumana, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":46727916.11,"abc":49207641.03,"fy":"2023","sd":"03/22/2023","cd":"2023-12-16","lat":14.662359,"lon":121.099545,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3036},{"i":4137,"cid":"22OB0152","pid":"P00620008LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 2), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J.C. UYECIO CONSTRUCTION AND DEVELOPMENT COMPANY / A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":89708559.82,"abc":94569862.07,"fy":"2022","sd":"02/16/2022","cd":"2022-09-01","lat":14.53383,"lon":121.099977,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[4147,4132,4121],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OB0151 to 22OB0154) cover the same site, together worth PHP 358,573,044.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":348},{"i":4138,"cid":"24OB0095","pid":"P00824594LZ","t":"Rehabilitation of Drainage System at Karangalan P2B2 and Vicinity, Barangay Manggahan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":14400000.0,"abc":14699667.94,"fy":"2024","sd":"04/08/2024","cd":"2024-09-04","lat":14.603216,"lon":121.100573,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3037},{"i":4139,"cid":"23DI0001","pid":"P00737522LZ","t":"Rehabilitation of Drainage at Barangay Macabling, Santa Rosa City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"DATZLAV CONSTRUCTION","c":4854180.0,"abc":4950000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-06-29","lat":14.301091,"lon":121.100587,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macabling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3038},{"i":4140,"cid":"23OB0093","pid":"P00725944LZ","t":"Rehabilitation of Flood Mitigation Structure, Hakbangan Creek at Barangay Dela Paz, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":5118488.9,"abc":5389012.31,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.61326,"lon":121.100644,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Hakbangan","wn":"Hakbangan Creek","wd":0.0,"wp":[14.61325,121.10065],"wst":"matched","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3039},{"i":4141,"cid":"23BC0093","pid":"P00740572LZ","t":"Construction of Bank Protection along Alimoan Creek, Alimoan, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"J.B. ALCANTARA BUILDERS","c":9652511.61,"abc":9900000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-01-22","lat":18.576474,"lon":121.100711,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Alimoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3040},{"i":4142,"cid":"22OB0309","pid":"P00621267LZ","t":"Bank Improvement along Eastbank Road, Manggahan Floodway, Pasig City (Phase 2)","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":68727191.24,"abc":72374766.67,"fy":"2022","sd":"03/24/2022","cd":"2022-10-04","lat":14.577072,"lon":121.100785,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.1,"wp":[14.57654,121.1],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3041},{"i":4143,"cid":"22OF0109","pid":"P00621434LZ","t":"Construction of Flood Control Structure, Brgy. Bagong Silangan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"TRICHES CONSTRUCTION & TRADING","c":44160217.49,"abc":46000226.55,"fy":"2022","sd":"05/17/2022","cd":"2023-03-12","lat":14.70788,"lon":121.10093,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Silangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3042},{"i":4144,"cid":"24OB0110","pid":"P00821450LZ","t":"Rehabilitation of Drainage System at Karangalan Village and Vicinity, Barangay Manggahan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JCML BUILDERS","c":14360000.0,"abc":14699878.61,"fy":"2024","sd":"02/12/2024","cd":"2024-10-02","lat":14.603111,"lon":121.101047,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3043},{"i":4145,"cid":"23OB0068","pid":"P00725954LZ","t":"Construction of Drainage System along Soldier St. and Vicinity, Barangay Sta. Lucia and vicinity, Pasig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":3726263.38,"abc":3919889.48,"fy":"2023","sd":"02/06/2023","cd":"2023-05-07","lat":14.577115,"lon":121.101301,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3044},{"i":4146,"cid":"23CE0117","pid":"P00742146LZ","t":"Construction of Flood Control Structures Along Pampanga River, Brgy. Poblacion Norte, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":98996644.29,"abc":99000000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-09-19","lat":15.725695,"lon":121.101345,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.01,"wp":[15.72573,121.10139],"wst":"matched","br":"Poblacion Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3045},{"i":4147,"cid":"22OB0151","pid":"P00620007LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 1), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"J.C. UYECIO CONSTRUCTION AND DEVELOPMENT COMPANY / A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":89179369.28,"abc":94569850.78,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.534907,"lon":121.101403,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[4137,4132,4121],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22OB0151 to 22OB0154) cover the same site, together worth PHP 358,573,044.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":349},{"i":4148,"cid":"22OB0339","pid":"P00639405LZ","t":"Construction of Drainage Outfall, Twinville Subdivision, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":46531390.29,"abc":48999298.55,"fy":"2022","sd":"03/24/2022","cd":"2023-04-06","lat":14.664308,"lon":121.101445,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3046},{"i":4149,"cid":"23OB0309","pid":"P00742234LZ","t":"Rehabilitation of Drainage System at Barangay Pinagbuhatan and Vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":29782000.0,"abc":31359513.39,"fy":"2023","sd":"09/05/2023","cd":"2024-03-26","lat":14.540962,"lon":121.101492,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[4133,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":27,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":807},{"i":4150,"cid":"23OB0089","pid":"P00725518LZ","t":"Rehabilitation of Flood Control Structure along Eastbank Road, Manggahan Floodway (Package 4), Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":68598212.46,"abc":72374545.58,"fy":"2023","sd":"02/13/2023","cd":"2024-07-08","lat":14.576213,"lon":121.101553,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.12,"wp":[14.57561,121.10066],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3047},{"i":4151,"cid":"23E00165","pid":"P00740428LZ","t":"Construction of Dike along Dulangan River, Evangelista Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":241246196.1,"abc":241249996.4,"fy":"2023","sd":"04/13/2023","cd":"2023-10-15","lat":13.2865,"lon":121.101679,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":0.01,"wp":[13.28657,121.10158],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3048},{"i":4152,"cid":"23E00163","pid":"P00740426LZ","t":"Construction of Dike along Dulangan River, Sitio Bayanan, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"PHESCO, INCORPORATED","c":241246775.7,"abc":241250000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-10-15","lat":13.2919,"lon":121.1017,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":0.01,"wp":[13.29184,121.10171],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3049},{"i":4153,"cid":"23OB0086","pid":"P00727003LZ","t":"Rehabilitation of Drainage System at Karangalan and Vicinity, Barangay Manggahan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":13960450.0,"abc":14699788.83,"fy":"2023","sd":"06/08/2023","cd":"2024-02-10","lat":14.612199,"lon":121.101867,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3050},{"i":4154,"cid":"23ED0022","pid":"P00727185LZ","t":"Construction/Upgrading/Rehabilitation of Drainage along CNR K0015 + 583 - K0016 + 067","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BACO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"CMSEL CONSTRUCTION & DEVELOPER","c":9044555.45,"abc":9104200.0,"fy":"2023","sd":"03/30/2023","cd":"2023-08-15","lat":13.35722,"lon":121.1019,"sm":92,"fm":92,"tm":null,"am":92,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3051},{"i":4155,"cid":"24OB0093","pid":"P00824592LZ","t":"Rehabilitation of Drainage System at Karangalan Village, Barangay Dela Paz, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":9600000.0,"abc":9799704.94,"fy":"2024","sd":"04/08/2024","cd":"2024-09-02","lat":14.612665,"lon":121.101943,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3052},{"i":4156,"cid":"24OB0099","pid":"P00824598LZ","t":"Rehabilitation of Drainage Structure at Brgy. Sta Lucia, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"AZUL BUILDERS","c":4825413.74,"abc":4899842.29,"fy":"2024","sd":"03/11/2024","cd":"2024-06-23","lat":14.576564,"lon":121.102025,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3053},{"i":4157,"cid":"24OB0100","pid":"P00823266LZ","t":"Rehabilitation of Flood Mitigation Structure along Buli Creek, Pasig City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":94530649.03,"abc":96499470.57,"fy":"2024","sd":"04/01/2024","cd":"2025-02-24","lat":14.575723,"lon":121.102072,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli Creek","wd":0.0,"wp":[14.57575,121.10205],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3054},{"i":4158,"cid":"24OB0369","pid":"P00845861LZ","t":"Improvement of Drainage System at Barangay Tumana, Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":29177719.98,"abc":29699615.72,"fy":"2024","sd":"04/08/2024","cd":"2025-01-17","lat":14.658164,"lon":121.102115,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3055},{"i":4159,"cid":"23OB0448","pid":"P00742108LZ","t":"Construction of Slope Protection along Napindan River, Package 1, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":91636178.26,"abc":96499766.49,"fy":"2023","sd":"09/29/2023","cd":"2024-01-15","lat":14.534794,"lon":121.102213,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Napindan","wn":"Napindan Creek","wd":1.64,"wp":[14.54338,121.11461],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3056},{"i":4160,"cid":"24DE0042","pid":"P00820868LZ","t":"Construction of Flood Control Structure, Barangay Dela Paz, Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-17","lat":13.625075,"lon":121.10266,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3057},{"i":4161,"cid":"23OB0082","pid":"P00727005LZ","t":"Rehabilitation of Drainage System at Nagpayong and Vicinity, Barangay Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ANDREW LOUIS CONSTRUCTION AND TRADING","c":5584065.0,"abc":5879820.49,"fy":"2023","sd":"05/23/2023","cd":"2023-08-20","lat":14.541144,"lon":121.102712,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4189,4981,4854,4190,4133],"cl":[4133,4149,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":185},{"i":4162,"cid":"24OB0098","pid":"P00824597LZ","t":"Rehabilitation of Drainage System within Ciudad Grande and Vicinity, Barangay Rosario, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":9602277.0,"abc":9799869.07,"fy":"2024","sd":"04/08/2024","cd":"2024-10-04","lat":14.593409,"lon":121.102808,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3058},{"i":4163,"cid":"23OB0069","pid":"P00727002LZ","t":"Construction of Drainage System along Venice St., Ciudad Grande, Barangay Rosario and vicinity, Paslg City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"CALCON ENGINEERING","c":7405117.3,"abc":7839304.92,"fy":"2023","sd":"03/06/2023","cd":"2023-09-01","lat":14.594093,"lon":121.102829,"sm":412,"fm":412,"tm":null,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3059},{"i":4164,"cid":"23DD0210","pid":"P00742416LZ","t":"Rehabilitation of Drainage System at Poblacion Barangay IV, San Jose, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-07-14","lat":13.87843,"lon":121.1029,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"IV","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3060},{"i":4165,"cid":"23OB0096","pid":"P00725945LZ","t":"Rehabilitation of Flood Mitigation Structure, Manmade Creek at Barangay Manggahan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. BERNARDO CONST., INC.","c":18613450.0,"abc":19599635.08,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.59389,"lon":121.103056,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manmade","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3061},{"i":4166,"cid":"22DD0294","pid":"P00640542LZ","t":"Construction of Drainage System at Barangay Banaybanay II, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":9603000.0,"abc":9900000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-08-07","lat":13.92371,"lon":121.10316,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banaybanay II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3062},{"i":4167,"cid":"23OB0449","pid":"P00742109LZ","t":"Construction of Slope Protection along Napindan River, Package 2, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":91577987.28,"abc":96499459.73,"fy":"2023","sd":"09/29/2023","cd":"2024-01-15","lat":14.533785,"lon":121.103187,"sm":1521,"fm":1521,"tm":1521,"am":412,"md":0.04,"ls":"boundary","ww":"Napindan","wn":"Napindan Creek","wd":1.63,"wp":[14.54338,121.11461],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3063},{"i":4168,"cid":"24OB0370","pid":"P00845862LZ","t":"Rehabilitation of Drainage System including Laterals along A. Sandoval Avenue, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":19395750.0,"abc":19799647.76,"fy":"2024","sd":"04/08/2024","cd":"2024-08-07","lat":14.545895,"lon":121.103225,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3064},{"i":4169,"cid":"22DI0110","pid":"P00640559LZ","t":"Rehabilitation of Drainage System along Barangay Sirang- Lupa, Barangay Punta, Barangay Turbina, Barangay Bunggo and Barangay San Juan, Calamba City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAGNA RICH TRADING & CONSTRUCTION","c":7274006.35,"abc":7425000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-03-07","lat":14.20177,"lon":121.10369,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sirang- Lupa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3065},{"i":4170,"cid":"23DD0209","pid":"P00742415LZ","t":"Rehabilitation of Drainage System at Poblacion Barangay III, San Jose, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP / LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-07-14","lat":13.87655,"lon":121.10384,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3066},{"i":4171,"cid":"23E00164","pid":"P00740427LZ","t":"Construction of Dike along Dulangan River, Sitio Bagong Buhay, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":241245362.7,"abc":241250000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-10-15","lat":13.29913,"lon":121.1041,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":0.17,"wp":[13.30008,121.10286],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3067},{"i":4172,"cid":"22OB0336","pid":"P00639406LZ","t":"Construction of Drainage Outfall, Barangay Nangka, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":46521674.81,"abc":48999803.51,"fy":"2022","sd":"03/24/2022","cd":"2022-12-18","lat":14.66507,"lon":121.104129,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nangka","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3068},{"i":4173,"cid":"23OB0024","pid":"P00725516LZ","t":"Construction of Slope Protection along Balanti Creek, Barangay San Roque, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"METER KING INC. / JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":83533778.38,"abc":88003611.07,"fy":"2023","sd":"06/09/2023","cd":"2024-02-03","lat":14.624492,"lon":121.104324,"sm":403,"fm":403,"tm":403,"am":289,"md":0.01,"ls":"boundary","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3069},{"i":4174,"cid":"24ED0066","pid":"P00825126LZ","t":"Construction of River Control Structure Along Catuiran River, Sitio Duluhan Section, Brgy. Arangin, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96499978.46,"abc":98000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-22","lat":13.220556,"lon":121.104722,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"River Control Structure Along Catuiran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Arangin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3070},{"i":4175,"cid":"21OB0175","pid":"P00525717LZ","t":"Construction/Rehabilitation of Greenheights Subdivision Box Culvert, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"F.P. DE GUZMAN CONSTRUCTION, INC.","c":46534811.01,"abc":48999823.99,"fy":"2021","sd":"05/14/2021","cd":"2023-04-28","lat":14.663012,"lon":121.105399,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3071},{"i":4176,"cid":"23DD0242","pid":"P00742414LZ","t":"Rehabilitation of Drainage System at Poblacion Barangay I, San Jose, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-08-10","lat":13.87923,"lon":121.10587,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3072},{"i":4177,"cid":"23DD0205","pid":"P00742407LZ","t":"Rehabilitation of Drainage System, Brgy. Poblacion Barangay II, San Jose, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":11043450.0,"abc":11385000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-08-07","lat":13.87868,"lon":121.10595,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Barangay II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3073},{"i":4178,"cid":"23BJ0001","pid":"P00725665LZ","t":"Construction of Flood Control Structures at Lamo Section, Dupax Del Norte, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"DUPAX DEL NORTE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":48249825.26,"abc":48250000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-27","lat":16.33777,"lon":121.10611,"sm":543,"fm":543,"tm":543,"am":543,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3074},{"i":4179,"cid":"24OB0106","pid":"P00821424LZ","t":"Construction of Drainage System at Barangay Pinagbuhatan, Phase 4, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"F316 CONSTRUCTION CORP.","c":14358000.0,"abc":14699465.76,"fy":"2024","sd":"02/12/2024","cd":"2024-09-18","lat":14.547137,"lon":121.106642,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":"Phase 4","dup":[],"run":[4188,4184],"cl":[4133,4149,4161,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0104 to 24OB0106) cover the same site, together worth PHP 43,075,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":154},{"i":4180,"cid":"22CE0141","pid":"P00621619LZ","t":"Construction of Flood Control Structure along Pampanga River, Barangay Poblacion Norte, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":48388030.69,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-09-26","lat":15.722071,"lon":121.106765,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.04,"wp":[15.72181,121.1065],"wst":"matched","br":"Poblacion Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3075},{"i":4181,"cid":"23CE0044","pid":"P00726734LZ","t":"Construction of Flood Control Structure along Pampanga River, Barangay Ganduz, Pantabangan, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PANTABANGAN (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES / SYMMETRICON BUILDERS CORP.","c":48995000.0,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-08-08","lat":15.721971,"lon":121.10686,"sm":1094,"fm":1094,"tm":1094,"am":1206,"md":0.33,"ls":"boundary","ww":"Pampanga","wn":"Pampanga River","wd":0.04,"wp":[15.72171,121.1066],"wst":"matched","br":"Ganduz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3076},{"i":4182,"cid":"24DO0057","pid":"P00823552LZ","t":"Rehabilitation of Flood Control Structure along Nangka River, Barangay Banaba (Phase 1), San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":48250000.0,"abc":49000000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-07-15","lat":14.6752,"lon":121.10691,"sm":1329,"fm":1329,"tm":1329,"am":403,"md":0.02,"ls":"boundary","ww":"Nangka","wn":"Nangka River","wd":0.03,"wp":[14.67539,121.10708],"wst":"matched","br":"Banaba","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3077},{"i":4183,"cid":"22BI0055","pid":"P00621420LZ","t":"Construction of Sto. Domingo Flood Control, Sto. Domingo, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"E.T. LATAWAN CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-01-15","lat":16.404979,"lon":121.10693,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3078},{"i":4184,"cid":"24OB0105","pid":"P00821423LZ","t":"Construction of Drainage System at Barangay Pinagbuhatan, Phase 3, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"F.P. DE GUZMAN CONSTRUCTION, INC.","c":14355000.0,"abc":14699708.43,"fy":"2024","sd":"02/12/2024","cd":"2024-09-18","lat":14.547724,"lon":121.106966,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":"Phase 3","dup":[],"run":[4188,4179],"cl":[4133,4149,4161,4179,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0104 to 24OB0106) cover the same site, together worth PHP 43,075,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":155},{"i":4185,"cid":"22CE0142","pid":"P00621620LZ","t":"Construction of Flood Control Structure along Pampanga River, Brgy. Poblacion East - Barangay Calaocan, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":48020454.15,"abc":49000000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-09-02","lat":15.721937,"lon":121.107051,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[15.72164,121.10668],"wst":"matched","br":"Poblacion East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3079},{"i":4186,"cid":"23OB0023","pid":"P00725515LZ","t":"Construction of Slope Protection along Balanti Creek at Katipunan Extension, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":56741661.01,"abc":67549059.58,"fy":"2023","sd":"02/13/2023","cd":"2024-03-14","lat":14.634838,"lon":121.107093,"sm":403,"fm":403,"tm":403,"am":289,"md":0.02,"ls":"boundary","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3080},{"i":4187,"cid":"22OB0196","pid":"P00632707LZ","t":"Improvement of Balanti Creek at Katipunan Extension, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":46353618.68,"abc":48999910.66,"fy":"2022","sd":"02/08/2022","cd":"2022-10-18","lat":14.635304,"lon":121.107168,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3081},{"i":4188,"cid":"24OB0104","pid":"P00821422LZ","t":"Construction of Drainage System at Barangay Pinagbuhatan, Phase 2, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":14362000.0,"abc":14699775.85,"fy":"2024","sd":"02/12/2024","cd":"2024-10-08","lat":14.548303,"lon":121.107234,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":"Phase 2","dup":[],"run":[4184,4179],"cl":[4133,4149,4161,4179,4184,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24OB0104 to 24OB0106) cover the same site, together worth PHP 43,075,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":156},{"i":4189,"cid":"23OB0076","pid":"P00727004LZ","t":"Construction of Drainage Outfall at Dilang and Vicinity, Barangay Pinagbuhatan, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":14887658.04,"abc":15679471.34,"fy":"2023","sd":"03/20/2023","cd":"2023-10-15","lat":14.548365,"lon":121.107318,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4981,4854,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4190,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":157},{"i":4190,"cid":"23OB0081","pid":"P00727006LZ","t":"Rehabilitation of Drainage System at Eusebio Avenue and Vicinity, Barangay Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":13491856.5,"abc":14209432.86,"fy":"2023","sd":"03/20/2023","cd":"2023-10-15","lat":14.547473,"lon":121.107514,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4189,4981,4854,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4223,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":158},{"i":4191,"cid":"23BI0078","pid":"P00740574LZ","t":"Construction of Drainage Canal, Bambang, Nueva Vizcaya","w":"Construction of Drainage Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"05/31/2023","cd":"2024-03-12","lat":16.38854,"lon":121.10755,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3082},{"i":4192,"cid":"24CF0007","pid":"P00821258LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Palayan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PALAYAN CITY (CAPITAL) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"SOLFIO P. JACINTO CONSTRUCTION INC.","c":68997401.62,"abc":70286667.02,"fy":"2024","sd":"02/13/2024","cd":"2024-04-30","lat":15.59811,"lon":121.10781,"sm":1068,"fm":1068,"tm":1068,"am":1068,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.06,"wp":[15.59852,121.10824],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3083},{"i":4193,"cid":"22BI0010","pid":"P00621066LZ","t":"Construction of Buenavista River Control along Magat River, Buenavista Section, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL / R.O. BUILDERS & DEVELOPMENT CORPORATION","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-08-23","lat":16.442317,"lon":121.108136,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Buenavista","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3084},{"i":4194,"cid":"23OB0091","pid":"P00725946LZ","t":"Rehabilitation of Flood Mitigation Structure, Buli Creek at Barangay Sta. Lucia, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":26522268.36,"abc":32339673.69,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.587641,"lon":121.108608,"sm":412,"fm":412,"tm":412,"am":289,"md":0.0,"ls":"inside","ww":"Buli","wn":"Buli Creek","wd":1.48,"wp":[14.57581,121.10213],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3085},{"i":4195,"cid":"21OB0257","pid":"P00525746LZ","t":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 4A - River Improvement Works Along Upper Marikina River (Upstream of Marikina Bridge) Sta. 15+450 to Sta. 15+600, Right Bank, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":91626579.72,"abc":96499544.03,"fy":"2021","sd":"02/08/2022","cd":"2022-12-04","lat":14.6775,"lon":121.1087,"sm":403,"fm":null,"tm":403,"am":1329,"md":0.3,"ls":"boundary","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":150.0,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3086},{"i":4196,"cid":"22DN0134","pid":"P00639500LZ","t":"Improvement of Waterway along Balanti Creek, Cainta, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"AARCON BUILDERS","c":48999996.69,"abc":49000000.0,"fy":"2022","sd":"07/06/2022","cd":"2023-03-02","lat":14.60468,"lon":121.10872,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3087},{"i":4197,"cid":"23OB0066","pid":"P00725947LZ","t":"Construction of Box Culvert along Tramo Road, Barangay Sta. Lucia, Pasig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":46516087.53,"abc":48999819.12,"fy":"2023","sd":"02/06/2023","cd":"2024-06-03","lat":14.58011,"lon":121.10872,"sm":412,"fm":412,"tm":412,"am":289,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3088},{"i":4198,"cid":"23OB0035","pid":"P00725933LZ","t":"Construction of Box Culvert along Zenaida Subdivision, Barangay Concepcion Uno, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":35355762.73,"abc":37239416.62,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.637264,"lon":121.108804,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion Uno","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3089},{"i":4199,"cid":"22PK0088","pid":"P00644765LZ","t":"Repair/Rehabilitation of National Road along Mt. Province Bdry.-Calanan-Pinukouk-Abbut Road, K0428 + 000 - K0428 + 049.50, Basao, Tinglayan, Kalinga","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":9620504.08,"abc":9630700.0,"fy":"2022","sd":"01/12/2023","cd":"2023-10-24","lat":17.222835,"lon":121.109027,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3090},{"i":4200,"cid":"22CD0212","pid":"P00637071LZ","t":"Construction of Slope Protection Structure, Brgy. San Roque, City of San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":39197202.76,"abc":39199406.15,"fy":"2022","sd":"05/26/2022","cd":"2022-11-29","lat":14.82009,"lon":121.10905,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3091},{"i":4201,"cid":"21D00077","pid":"P00525649LZ","t":"Construction of Flood Control Structures of Balanti Creek, Brgy. San Isidro, Cainta, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Cainta","deo":"Rizal 1st District Engineering Office","co":"G. ANORE CONSTRUCTION / DOUBLE 12 CONSTRUCTION & SUPPLY","c":45311851.54,"abc":45355000.0,"fy":"2021","sd":"04/11/2022","cd":"2022-12-11","lat":14.60138,"lon":121.1093,"sm":289,"fm":null,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3092},{"i":4202,"cid":"21BI0049","pid":"P00561677LZ","t":"Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure along Magat River, Macate Section, Brgy. Macate, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES)","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-08-20","lat":16.40187,"lon":121.10935,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.02,"wp":[16.40176,121.10948],"wst":"matched","br":"Macate","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3093},{"i":4203,"cid":"22D00058","pid":"P00620636LZ","t":"Construction of Slope Protection Structure, Balanti Creek, Cainta, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"G. ANORE CONSTRUCTION","c":11577576.99,"abc":11580000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-09-28","lat":14.603536,"lon":121.109449,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3094},{"i":4204,"cid":"22OF0024","pid":"P00620441LZ","t":"Construction of Flood Control Structure and Tributaries along Culiat Creek (Left Side) Barangay Vasra, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":42768180.0,"abc":44100000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-12-12","lat":14.692343,"lon":121.10959,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Culiat","wn":"Culiat Creek","wd":7.46,"wp":[14.65434,121.05235],"wst":"matched","br":"Vasra","len":null,"ph":null,"dup":[4205],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.46,"text":"The title names Culiat, which OpenStreetMap maps through the stated municipality, but the pin is 7.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 126,141,294.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":196},{"i":4205,"cid":"22OF0051","pid":"P00620766LZ","t":"Construction of Slope Protection in Marikina River, Sta. 20+400 to Sta. 20+550, Brgy. Batasan Hills, Quezon City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":83373114.19,"abc":86850000.0,"fy":"2022","sd":"02/16/2022","cd":"2023-03-06","lat":14.692343,"lon":121.10959,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.19,"wp":[14.69207,121.11138],"wst":"matched","br":"Batasan Hills","len":150.0,"ph":null,"dup":[4204],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 126,141,294.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":808},{"i":4206,"cid":"22OF0052","pid":"P00620928LZ","t":"Construction of Slope Protection Structure in Marikina River, Sta. 20+150 to Sta. 20+400, Brgy. Batasan Hills, Quezon City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":42330218.21,"abc":44100000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-21","lat":14.69231,"lon":121.1096,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.19,"wp":[14.69204,121.11137],"wst":"matched","br":"Batasan Hills","len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3095},{"i":4207,"cid":"22OF0152","pid":"P00620767LZ","t":"Construction of Slope Protection in Marikina River, Sta. 20+550 to Sta. 20+700, Brgy. Batasan Hills, Quezon City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":83370218.21,"abc":86850000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-04-11","lat":14.692322,"lon":121.10966,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.19,"wp":[14.69206,121.11138],"wst":"matched","br":"Batasan Hills","len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3096},{"i":4208,"cid":"22OB0215","pid":"P00632709LZ","t":"Rehabilitation of La Consolacion Drainage System, Barangay Parang, Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":27920821.91,"abc":29399622.94,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":14.653594,"lon":121.109707,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Parang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3097},{"i":4209,"cid":"22PB0023","pid":"P00637065LZ","t":"Construction of Sicapo River Flood Control Sta. 88+632-Sta. 88+932 (L/S), Kabugao, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION","c":24500000.0,"abc":24499866.44,"fy":"2022","sd":"05/03/2022","cd":"2023-04-30","lat":18.026667,"lon":121.109722,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Sicapo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3098},{"i":4210,"cid":"21B00068","pid":"P00526279LZ","t":"Construction of Flood Control System, Brgy. Salinas, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"J.H. PAJARA CONSTRUCTION CORPORATION","c":117368750.3,"abc":125450000.0,"fy":"2021","sd":"01/18/2022","cd":"2022-12-12","lat":16.3825,"lon":121.11,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salinas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":390},{"i":4211,"cid":"23OB0034","pid":"P00725932LZ","t":"Construction of Box Culvert along Summer Homes, Barangay Concepcion Uno, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":46546399.2,"abc":48999746.68,"fy":"2023","sd":"02/06/2023","cd":"2024-12-01","lat":14.644015,"lon":121.110113,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion Uno","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3099},{"i":4212,"cid":"24OB0330","pid":"P00825202LZ","t":"Improvement along Balanti Creek, Brgy. Concepcion Dos, Marikina City, Phase 1","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":48001608.49,"abc":48999698.7,"fy":"2024","sd":"04/01/2024","cd":"2025-03-03","lat":14.636266,"lon":121.110178,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Concepcion Dos","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3100},{"i":4213,"cid":"22DI0020","pid":"P00620584LZ","t":"Construction of Revetment along Malitlit Waterways, (Staggered), Brgy. Malitlit, Sta. Rosa City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES / EOZ CONSTRUCTION","c":43475714.0,"abc":44682120.0,"fy":"2022","sd":"02/14/2022","cd":"2022-11-28","lat":14.2661,"lon":121.11053,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malitlit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3101},{"i":4214,"cid":"23OB0036","pid":"P00725934LZ","t":"Construction of Box Culvert Rainbow Street, Barangay Concepcion Dos, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. / J.M.L.R. CONSTRUCTION AND SUPPLY","c":41878276.31,"abc":44099791.69,"fy":"2023","sd":"02/06/2023","cd":"2024-03-26","lat":14.64214,"lon":121.1107,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion Dos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3102},{"i":4215,"cid":"23OF0025","pid":"P00725513LZ","t":"Construction of Flood Mitigation Structure along Marikina River, Barangay Batasan Hills, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":96499650.0,"abc":96499650.0,"fy":"2023","sd":"02/13/2023","cd":"2023-12-18","lat":14.688848,"lon":121.110816,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.06,"wp":[14.689,121.11131],"wst":"matched","br":"Batasan Hills","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3103},{"i":4216,"cid":"23OF0036","pid":"P00725553LZ","t":"Construction of Slope Protection Structure along Marikina River, Barangay Bagong Silangan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":42762228.48,"abc":43559998.0,"fy":"2023","sd":"02/14/2023","cd":"2024-03-31","lat":14.689484,"lon":121.110941,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.03,"wp":[14.68952,121.1112],"wst":"matched","br":"Bagong Silangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3104},{"i":4217,"cid":"21OB0177","pid":"P00525723LZ","t":"Improvement of Balanti and Green Pumping Station, Barangay Concepcion Dos, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":27918676.97,"abc":29399826.31,"fy":"2021","sd":"08/13/2021","cd":"2022-09-29","lat":14.636029,"lon":121.110955,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion Dos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3105},{"i":4218,"cid":"23OF0062","pid":"P00725552LZ","t":"Construction of Flood Mitigation Structure along Marikina River, Barangay Bagong Silangan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) / PILASTRO BUILDERS & DEVELOPMENT INC.","c":96499629.5,"abc":96499629.5,"fy":"2023","sd":"02/27/2023","cd":"2023-12-19","lat":14.6918,"lon":121.111,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.04,"wp":[14.69175,121.11133],"wst":"matched","br":"Bagong Silangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3106},{"i":4219,"cid":"24OF0126","pid":"P00820023LZ","t":"Construction of Flood Control Structure along Marikina River, Barangay Bagong Silangan, Quezon City","w":"Construction of Revetment","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES) / AF3 CONSTRUCTION CORPORATION","c":95341600.18,"abc":96499794.5,"fy":"2024","sd":"03/18/2024","cd":"2025-03-11","lat":14.693778,"lon":121.111079,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.05,"wp":[14.69384,121.11157],"wst":"matched","br":"Bagong Silangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3107},{"i":4220,"cid":"23OC0022","pid":"P00737391LZ","t":"Construction of Revetment along Makati-Pateros River, Barangay Pembo, Makati City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"AARCON BUILDERS","c":39599226.64,"abc":39600000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.543736,"lon":121.061089,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Makati-Pateros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3108},{"i":4221,"cid":"21OB0313","pid":"P00525745LZ","t":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+601.86 to Sta. 19+621.86, Left Bank, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":51780561.65,"abc":54805730.27,"fy":"2021","sd":"03/17/2022","cd":"2023-01-10","lat":14.68208,"lon":121.11134,"sm":403,"fm":null,"tm":403,"am":1329,"md":0.88,"ls":"boundary","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":20.0,"ph":"Phase V","dup":[4120],"run":[],"cl":[],"L":"field","s":51,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,769,062.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.56,"value":2589028,"text":"About PHP 2,589,028 per metre over 20 m, versus a median of PHP 139,997 for flood mitigation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":96},{"i":4222,"cid":"23DO0065","pid":"P00737544LZ","t":"Construction of Flood Control Structure, Barangay San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"JUNMICMARC CONSTRUCTION","c":9164395.48,"abc":9900000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-10-19","lat":14.752029,"lon":121.135509,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3109},{"i":4223,"cid":"23OB0100","pid":"P00725942LZ","t":"Rehabilitation of Flood Mitigation Structure, San Agustin Creek at Barangay Pinagbuhatan, Bambang, Sto. Tomas and Kalawaan, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":6979271.06,"abc":7349475.04,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.562289,"lon":121.083796,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"San Agustin","wn":"Sapa de San Agustin","wd":0.0,"wp":[14.56229,121.0838],"wst":"matched","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4412,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":920},{"i":4224,"cid":"22DE0033","pid":"P00620863LZ","t":"Construction of Flood Control Structure along Lobo River, Fabrica, Lobo, Batangas (Section 1) Package A","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":79130000.0,"abc":79130000.0,"fy":"2022","sd":"02/15/2022","cd":"2023-11-16","lat":13.634299,"lon":121.205112,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":"Lobo","wn":"Lobo River","wd":0.06,"wp":[13.63411,121.20563],"wst":"matched","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3110},{"i":4225,"cid":"23DE0031","pid":"P00740396LZ","t":"Construction of Box Culvert, Brgy. Malabrigo, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"SUPPLICON BUILDERS","c":9650000.0,"abc":9800000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-09-11","lat":13.605312,"lon":121.257954,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malabrigo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3111},{"i":4226,"cid":"22DO0034","pid":"P00632918LZ","t":"Construction of Slope Protection along Ramos Creek at Sitio Campanario, Barangay Pagkalinawan, Jala-jala, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"JALA-JALA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"WAWAO BUILDERS","c":49500000.0,"abc":49500000.0,"fy":"2022","sd":"02/15/2022","cd":"2023-03-17","lat":14.318942,"lon":121.344545,"sm":661,"fm":661,"tm":661,"am":661,"md":0.0,"ls":"inside","ww":"Ramos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pagkalinawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3112},{"i":4227,"cid":"22DN0077","pid":"P00620645LZ","t":"Construction/Rehabilitation of Flood Control Structures at Angono River, Brgy. San Roque, Angono, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"ANGONO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"DJL ROBLES BUILDERS","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-10-07","lat":14.53367,"lon":121.16223,"sm":62,"fm":62,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":"Angono","wn":"Angono River","wd":0.0,"wp":[14.5337,121.16223],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3113},{"i":4228,"cid":"23BI0044","pid":"P00727116LZ","t":"Construction of Sto. Domingo Flood Control Structure along Magat River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-11-13","lat":16.407528,"lon":121.111489,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.07,"wp":[16.4072,121.11202],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3114},{"i":4229,"cid":"24BI0008","pid":"P00825052LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-05-21","lat":16.4446,"lon":121.11149,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.0,"wp":[16.44461,121.11146],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[4230,4407],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24BI0007 to 24BI0009) cover the same site, together worth PHP 434,250,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":186},{"i":4230,"cid":"24BI0007","pid":"P00825051LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-05-21","lat":16.4444,"lon":121.11154,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.01,"wp":[16.44443,121.11142],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[4229,4407],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24BI0007 to 24BI0009) cover the same site, together worth PHP 434,250,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":187},{"i":4231,"cid":"24DO0086","pid":"P00820304LZ","t":"Construction of Flood Control Structure along Upper Marikina River (Phase IX), San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"AKSUM CONTRACTING CORPORATION","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-07-15","lat":14.6888,"lon":121.11164,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IX","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3115},{"i":4232,"cid":"24BI0056","pid":"P00825047LZ","t":"Rehabilitation of Flood Control Structure along Magat River, Sto. Domingo Section, Package 2, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-05-15","lat":16.42189,"lon":121.1117,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.04,"wp":[16.42163,121.11146],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[4519,4329,4935,4256,4439],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":213},{"i":4233,"cid":"21OF0221","pid":"P00525501LZ","t":"Construction of Flood Mitigation Structure along Marikina River, Barangay Batasan Hills, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC.","c":82391142.18,"abc":85829995.0,"fy":"2021","sd":"03/24/2022","cd":"2023-03-17","lat":14.685235,"lon":121.111869,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.03,"wp":[14.6852,121.11218],"wst":"matched","br":"Batasan Hills","len":null,"ph":null,"dup":[4234],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 154,939,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1053},{"i":4234,"cid":"22OF0027","pid":"P00620104LZ","t":"Maintenance/Rehabilitation of Flood Control Structures, Brgy. Sta. Lucia, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"LE BRON CONSTRUCTION","c":72548700.0,"abc":72544050.0,"fy":"2022","sd":"02/16/2022","cd":"2023-01-29","lat":14.685235,"lon":121.111869,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[4233],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 154,939,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1054},{"i":4235,"cid":"24OF0074","pid":"P00824630LZ","t":"Construction of Drainage Systems, Tierra Pura, Brgy. Culiat, Quezon City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":9799974.07,"abc":9799976.1,"fy":"2024","sd":"02/23/2024","cd":"2024-05-17","lat":14.6698,"lon":121.0612,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culiat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3116},{"i":4236,"cid":"23OF0035","pid":"P00726014LZ","t":"Construction of Flood Control Structure and Tributaries at Barangay Batasan Hills, Quezon City (Phase 8)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":48440881.0,"abc":48999850.0,"fy":"2023","sd":"02/14/2023","cd":"2023-12-08","lat":14.702811,"lon":121.111926,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batasan Hills","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3117},{"i":4237,"cid":"24DO0081","pid":"P00820305LZ","t":"Construction of Flood Control Structure along Upper Marikina River (Phase VIII), San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"AKSUM CONTRACTING CORPORATION","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-06-16","lat":14.6874,"lon":121.11205,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase VIII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3118},{"i":4238,"cid":"21DO0025","pid":"P00526308LZ","t":"Construction of Flood Mitigation Facilities along Upper Marikina River, Brgy. Ampid to Brgy. Sta. Ana, San Mateo Section L/S, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"San Mateo","deo":"Rizal 2nd District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":82028200.85,"abc":95918105.0,"fy":"2021","sd":"03/22/2021","cd":"2022-12-02","lat":14.684786,"lon":121.112408,"sm":1329,"fm":null,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ampid","len":null,"ph":"Section L","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3119},{"i":4239,"cid":"24DC0105","pid":"P00839605LZ","t":"Rehabilitation of Drainage Canal, Rafael Lubis St., Barangay II-A, Mataasnakahoy, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"PRIME MOVER'S PHILS. CONSTRUCTION AND SUPPLIES INC.","c":9651344.0,"abc":9900000.0,"fy":"2024","sd":"05/02/2024","cd":"2024-09-28","lat":13.958791,"lon":121.112448,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"II-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3120},{"i":4240,"cid":"23BI0005","pid":"P00737364LZ","t":"Construction of Macate Flood Control Structure along Magat River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":59400000.0,"abc":59400000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-28","lat":16.405096,"lon":121.112677,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.06,"wp":[16.40533,121.11221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3121},{"i":4241,"cid":"24DC0070","pid":"P00839604LZ","t":"Rehabilitation of Drainage Canal, Purok 2, Mendoza St., Barangay District I, Mataasnakahoy, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"PRIME MOVER'S PHILS. CONSTRUCTION AND SUPPLIES INC.","c":4825893.43,"abc":4950000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-08-26","lat":13.955544,"lon":121.112719,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3122},{"i":4242,"cid":"24CD0051","pid":"P00820231LZ","t":"Construction of Flood Control Structure, Pinagpanggahan, Barangay Paradise III, San Jose del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":68871068.05,"abc":68876507.86,"fy":"2024","sd":"02/22/2024","cd":"2024-08-12","lat":14.839371,"lon":121.112951,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paradise III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3123},{"i":4243,"cid":"23DD0015","pid":"P00737499LZ","t":"Construction of Flood Control Structure, Box Culvert, Cultihan Road, Barangay Salaban, San Jose, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":5761800.0,"abc":5940000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-06-07","lat":13.86145,"lon":121.11301,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salaban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3124},{"i":4244,"cid":"21DN0096","pid":"P00525647LZ","t":"Construction/Rehabilitation of Flood Control Structures of Cainta River, Brgy. San Roque and Brgy. San Andres, Sta. 0-400, Cainta, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Cainta","deo":"Rizal 1st District Engineering Office","co":"C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":40819918.28,"abc":43425000.0,"fy":"2021","sd":"04/06/2022","cd":"2022-10-02","lat":14.56562,"lon":121.11358,"sm":289,"fm":null,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Cainta","wn":"Cainta River","wd":0.48,"wp":[14.5687,121.11668],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3125},{"i":4245,"cid":"23D00069","pid":"P00726568LZ","t":"Construction of Flood Control Mitigation Structure along Ampid River, Phase 1, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":125449994.8,"abc":125450000.0,"fy":"2023","sd":"03/10/2023","cd":"2024-06-01","lat":14.686517,"lon":121.113703,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Ampid","wn":"Ampid River","wd":0.11,"wp":[14.68567,121.1142],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3126},{"i":4246,"cid":"23DI0070","pid":"P00737523LZ","t":"Rehabilitation of Drainage at Barangay Labas, Santa Rosa City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"EOZ CONSTRUCTION","c":9626996.0,"abc":9900000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-10-10","lat":14.307767,"lon":121.114167,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3127},{"i":4247,"cid":"22DN0051","pid":"P00620261LZ","t":"Rehabilitation of Flood Control Structures along Muntindilaw River (Downstream), Antipolo City (Phase 4)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL / BELL CONSTRUCTION","c":92918782.24,"abc":92918885.0,"fy":"2022","sd":"03/07/2022","cd":"2023-04-24","lat":14.61415,"lon":121.11444,"sm":365,"fm":365,"tm":365,"am":289,"md":0.05,"ls":"boundary","ww":"Muntindilaw","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3128},{"i":4248,"cid":"23BJ0003","pid":"P00726140LZ","t":"Construction of Flood Control along Apean River, Mabasa Section, Dupax del Norte, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"DUPAX DEL NORTE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"R.O. BUILDERS & DEVELOPMENT CORPORATION","c":48999979.03,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-08-23","lat":16.31805,"lon":121.11472,"sm":543,"fm":543,"tm":543,"am":543,"md":0.0,"ls":"inside","ww":"Apean","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3129},{"i":4249,"cid":"24OB0329","pid":"P00823233LZ","t":"Improvement of Nangka River, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94534207.04,"abc":96499973.8,"fy":"2024","sd":"03/14/2024","cd":"2024-10-21","lat":14.673778,"lon":121.115083,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.67384,121.11505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3130},{"i":4250,"cid":"24DI0042","pid":"P00820365LZ","t":"Construction of River Protection Structure at Cabuyao River, near Malitlit-Eton Access Road, Cabuyao City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CABUYAO CITY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES / EOZ CONSTRUCTION","c":85373200.0,"abc":87562170.0,"fy":"2024","sd":"03/01/2024","cd":"2025-04-02","lat":14.27448,"lon":121.115096,"sm":282,"fm":282,"tm":282,"am":419,"md":0.01,"ls":"boundary","ww":"Cabuyao","wn":"Cabuyao River","wd":1.68,"wp":[14.28558,121.12572],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3131},{"i":4251,"cid":"24OB0046","pid":"P00825205LZ","t":"Improvement along Balanti Creek, Second District, Marikina City, Phase 3","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":39216457.66,"abc":40031878.59,"fy":"2024","sd":"04/01/2024","cd":"2025-02-03","lat":14.638368,"lon":121.115759,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3132},{"i":4252,"cid":"21OB0186","pid":"P00561473LZ","t":"Rehabilitation of Flood Control Structures, Balanti Creek, Barangay Concepcion Dos, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":27921189.21,"abc":29399531.36,"fy":"2021","sd":"03/01/2021","cd":"2022-08-24","lat":14.638327,"lon":121.115861,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Concepcion Dos","len":null,"ph":null,"dup":[4253],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 74,452,758.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":997},{"i":4253,"cid":"21OB0261","pid":"P00525724LZ","t":"Improvement of Balanti Creek and Russet Pumping Station, Brgy. Concepcion Dos, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":46531568.36,"abc":48999683.63,"fy":"2021","sd":"11/03/2021","cd":"2023-03-01","lat":14.638327,"lon":121.115861,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Balanti","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Concepcion Dos","len":null,"ph":null,"dup":[4252],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 74,452,758.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":965},{"i":4254,"cid":"22OB0338","pid":"P00639404LZ","t":"Construction of Drainage System along Olive St., Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":46531269.11,"abc":48999121.58,"fy":"2022","sd":"07/15/2022","cd":"2023-05-10","lat":14.638367,"lon":121.116186,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3133},{"i":4255,"cid":"24DN0023","pid":"P00820941LZ","t":"Construction of Flood Control Structure, Cainta River, Barangay San Roque, Cainta, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":48999965.78,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-07-26","lat":14.568439,"lon":121.116428,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Cainta","wn":"Cainta River","wd":0.04,"wp":[14.5687,121.11668],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3134},{"i":4256,"cid":"24BI0059","pid":"P00843255LZ","t":"Construction of Flood Control and Drainage Structure along Magat River, Magapuy Section, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":93605000.0,"abc":93605000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-06-30","lat":16.459627,"lon":121.11654,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.04,"wp":[16.45933,121.11681],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[4519,4232,4329,4935,4439],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":350},{"i":4257,"cid":"22DN0157","pid":"P00639501LZ","t":"Improvement of Waterway along Cainta River, Brgy. Sto. Domingo, Cainta, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"5-1 CONSTRUCTION CORPORATION","c":19592817.96,"abc":19600000.0,"fy":"2022","sd":"07/27/2022","cd":"2023-01-22","lat":14.58433,"lon":121.11658,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Cainta","wn":"Cainta River","wd":1.73,"wp":[14.56874,121.11678],"wst":"matched","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3135},{"i":4258,"cid":"21DN0080","pid":"P00561395LZ","t":"Construction/Rehabilitation of Flood Control Structure, Samberga Creek, Cainta, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Cainta","deo":"Rizal 1st District Engineering Office","co":"J.H.R. ENTERPRISES","c":24735004.03,"abc":24750000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-10-13","lat":14.59222,"lon":121.11703,"sm":289,"fm":null,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Samberga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3136},{"i":4259,"cid":"22DN0151","pid":"P00639505LZ","t":"Rehabilitation of Drainage System along Mabini Street and Catalino Cruz Street, Barangay Sto Niño, Cainta, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"RED TREE CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"07/20/2022","cd":"2023-04-05","lat":14.5783,"lon":121.11769,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3137},{"i":4260,"cid":"22DN0152","pid":"P00639503LZ","t":"Rehabilitation of Dike along Cainta River in Genesis Royale II, Rrgy. San Andres, Cainta, Rizal","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":4900000.0,"abc":4900000.0,"fy":"2022","sd":"07/20/2022","cd":"2023-01-15","lat":14.56862,"lon":121.11786,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":"Cainta","wn":"Cainta River","wd":0.12,"wp":[14.56874,121.11678],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3138},{"i":4261,"cid":"23PK0005","pid":"P00726661LZ","t":"Construction of Kurur-Paluwi Flood Control along Chico River, Sta. 192 + 305 - Sta. 192 + 435 (RS), Basao, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"JEP CONSTRUCTION","c":9752558.5,"abc":9800000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-11-13","lat":17.23164,"lon":121.11797,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.23135,121.11805],"wst":"matched","br":null,"len":130.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3139},{"i":4262,"cid":"21DO0051","pid":"P00561568LZ","t":"Construction of Slope Protection, Barangay Ampid II, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"San Mateo","deo":"Rizal 2nd District Engineering Office","co":"GENUINE BUILDERS","c":2887852.23,"abc":2970000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-11","lat":14.6857,"lon":121.1184,"sm":1329,"fm":null,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ampid II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3140},{"i":4263,"cid":"23DC0086","pid":"P00742392LZ","t":"Construction of Line Canal, Brgy. 2, Mataas na Kahoy","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"PRIME MOVER'S PHILS. CONSTRUCTION AND SUPPLIES INC.","c":4949600.0,"abc":4950000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-09-18","lat":13.947095,"lon":121.118572,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3141},{"i":4264,"cid":"24BI0040","pid":"P00820788LZ","t":"Construction of Bambang Cupas CIS Canal Lining and Flood Control Structure, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"N-J CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-05","lat":16.390788,"lon":121.118611,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Bambang Cupas CIS","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3142},{"i":4265,"cid":"24DC0089","pid":"P00846039LZ","t":"Construction of Drainage System, Silva St. Brgy 4, Mataasnakahoy, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"ISHIZAKI CONSTRUCTION & DEVELOPMENT CORPORATION","c":4949948.0,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-09","lat":13.949253,"lon":121.118637,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3143},{"i":4266,"cid":"23D00079","pid":"P00726569LZ","t":"Construction of Flood Control Mitigation Structure along Ampid River, Phase 2, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":106146063.9,"abc":106150000.0,"fy":"2023","sd":"03/10/2023","cd":"2024-05-10","lat":14.686256,"lon":121.118731,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Ampid","wn":"Ampid River","wd":0.07,"wp":[14.6856,121.11876],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3144},{"i":4267,"cid":"23DD0099","pid":"P00727157LZ","t":"Construction of Slope Protection, Brgy. Banay-Banay, Lipa City, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"TERAVERA CORPORATION","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-11-15","lat":13.93088,"lon":121.11905,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banay-Banay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3145},{"i":4268,"cid":"22EB0037","pid":"P00621110LZ","t":"Construction of Flood Control Structure, Labangan River, Sitio Yaw-Yawi 1, Brgy. Murtha, San Jose, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SAN JOSE (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":30889322.14,"abc":39200000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-06-07","lat":12.453551,"lon":121.119246,"sm":1305,"fm":1305,"tm":1305,"am":1305,"md":0.0,"ls":"inside","ww":"Labangan","wn":"Labangan River","wd":0.03,"wp":[12.45337,121.11951],"wst":"matched","br":"Murtha","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3146},{"i":4269,"cid":"23BI0090","pid":"P00745420LZ","t":"Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal River - Busilac Section along Magat River, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":19300000.0,"abc":19500000.0,"fy":"2023","sd":"06/28/2023","cd":"2023-11-30","lat":16.466654,"lon":121.119407,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Principal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3147},{"i":4270,"cid":"24BI0038","pid":"P00825235LZ","t":"Rehabilitation of Flood Control Structure along Magat River, (Phase 1) Barangay Busilac, Bayombong, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-02","lat":16.46681,"lon":121.11966,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.44,"wp":[16.46363,121.12215],"wst":"matched","br":"Busilac","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3148},{"i":4271,"cid":"20D00067","pid":"P00448737LZ","t":"Construction of Reinforced Concrete (Box Culvert Drainage) (Phase 1), Kambal Road Guitnangbayan II, San Mateo, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"San Mateo","deo":"Rizal 2nd District Engineering Office","co":"HONEYVILLECONST AND DEVELOPMENT CORPORATION","c":125449561.5,"abc":125450000.0,"fy":"2020","sd":"09/10/2020","cd":"2022-12-19","lat":14.697988,"lon":121.119845,"sm":1329,"fm":null,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3149},{"i":4272,"cid":"22DN0080","pid":"P00620256LZ","t":"Construction/Rehabilitation of Flood Control Structure, Taytay River, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":94926276.39,"abc":94946350.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-15","lat":14.553393,"lon":121.120147,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"Taytay","wn":"Taytay River","wd":0.01,"wp":[14.55345,121.12011],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3150},{"i":4273,"cid":"23DO0099","pid":"P00736622LZ","t":"Construction of Reinforced Concrete (Box Culvert Drainage) along Kambal Road, San Mateo, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"L.S.D.  CONSTRUCTION & SUPPLIES","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"09/21/2023","cd":"2024-05-15","lat":14.696903,"lon":121.12063,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3151},{"i":4274,"cid":"23DO0024","pid":"P00737540LZ","t":"Construction of Drainage System at Graceland Subdivision, Barangay Ampid II, San Mateo, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"JAM KONSTRUCT CONSTRUCTION AND DEVELOPMENT INC.","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-07-01","lat":14.685803,"lon":121.120688,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ampid II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3152},{"i":4275,"cid":"21P00020","pid":"P00525551LZ","t":"Construction of Flood Control along Lagawe River, Sta 0+000-Sta 0+680","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":null,"deo":"Ifugao 1st District Engineering Office","co":"JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES)","c":61570860.0,"abc":61566702.65,"fy":"2021","sd":"04/05/2022","cd":"2022-12-26","lat":16.78565,"lon":121.12075,"sm":null,"fm":null,"tm":null,"am":733,"md":null,"ls":"unknown","ww":"Lagawe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":680.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":128},{"i":4276,"cid":"22BI0019","pid":"P00621065LZ","t":"Construction of Abian Flood Control Structure along Magat River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"CITRUS COUNTRY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-12-18","lat":16.42443,"lon":121.12087,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.9,"wp":[16.41964,121.11404],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3153},{"i":4277,"cid":"22DN0092","pid":"P00620648LZ","t":"Rehabilitation of Flood Control Structures along Halang Creek to Muntindilaw River, Antipolo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BELL CONSTRUCTION","c":18433172.71,"abc":22050000.0,"fy":"2022","sd":"03/23/2022","cd":"2023-01-16","lat":14.62458,"lon":121.1209,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Halang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3154},{"i":4278,"cid":"22BI0035","pid":"P00641869LZ","t":"Construction of Busilac - Magsaysay Flood Control (Busilac Section) at Barangay Busilac, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-30","lat":16.46816,"lon":121.12092,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Busilac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3155},{"i":4279,"cid":"24DO0009","pid":"P00839651LZ","t":"Construction of Flood Control Structure in Barangay Ampid - 1, San Mateo, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-15","lat":14.6771,"lon":121.12104,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ampid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3156},{"i":4280,"cid":"22P00087","pid":"P00620805LZ","t":"Construction of Flood Control Structure along Lagawe River, Sta. 0+000-1+219, (Tungngod Side) Lagawe, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"LAGAWE (CAPITAL) (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION","c":75007552.68,"abc":111608777.2,"fy":"2022","sd":"10/14/2022","cd":"2023-10-11","lat":16.785,"lon":121.1211,"sm":733,"fm":733,"tm":733,"am":733,"md":0.0,"ls":"inside","ww":"Lagawe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1219.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3157},{"i":4281,"cid":"21OB0264","pid":"P00525478LZ","t":"Rehabilitation of Drainage System at Barangay Concepcion Dos, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":74449237.08,"abc":78399438.55,"fy":"2021","sd":"11/02/2021","cd":"2023-03-12","lat":14.636978,"lon":121.121523,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Concepcion Dos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3158},{"i":4282,"cid":"18EB0114","pid":"P00223238LZ","t":"Construction of Amaling River, River Flood Control Structures, Rizal, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Rizal","deo":"Mindoro Occidental District Engineering Office","co":"FFJJ CONSTRUCTION","c":92738982.46,"abc":96500000.0,"fy":"2018","sd":"04/20/2018","cd":"2023-02-27","lat":12.58658,"lon":121.12173,"sm":1210,"fm":null,"tm":1210,"am":1210,"md":0.0,"ls":"inside","ww":"Amaling","wn":"Amaling River","wd":0.18,"wp":[12.58566,121.12039],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3159},{"i":4283,"cid":"23DI0063","pid":"P00726224LZ","t":"Construction of River Protection Structure along Canlubang Waterways, (near Sto.Domingo Road Staggered), Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"PASCAL CONSTRUCTION","c":42953760.0,"abc":44100000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-12-06","lat":14.210035,"lon":121.122041,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3160},{"i":4284,"cid":"22DN0132","pid":"P00637799LZ","t":"Rehabilitation of Drainage in Parkplace Compound and Cementing of Dearborn, Burbank, Parklane and Sunrise Extension, Parkplace Compound, Brgy. San Isidro, Cainta, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ULTIMOS CONSTRUCTION CORP.","c":9899885.24,"abc":9800000.0,"fy":"2022","sd":"07/04/2022","cd":"2023-05-29","lat":14.592071,"lon":121.122429,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01019,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":966},{"i":4285,"cid":"22BI0017","pid":"P00621069LZ","t":"Construction of Magat River Control, Magapuy Section (Sta. 0+000 - Sta. 0+484), Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-12-16","lat":16.43321,"lon":121.12288,"sm":197,"fm":197,"tm":197,"am":142,"md":0.11,"ls":"boundary","ww":"Magat","wn":"Magat River","wd":1.32,"wp":[16.432,121.11054],"wst":"matched","br":null,"len":484.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3161},{"i":4286,"cid":"23BI0023","pid":"P00726710LZ","t":"Construction of Busilac - Magsaysay Flood Control along Magat River, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"TRIPLE P CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-15","lat":16.471383,"lon":121.12314,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.35,"wp":[16.46957,121.12579],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4287],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,800,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1055},{"i":4287,"cid":"23BI0062","pid":"P00727117LZ","t":"Construction of Buenavista - Busilac Flood Control Structure along Magat River, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-04-23","lat":16.471384,"lon":121.12314,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.35,"wp":[16.46957,121.12579],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4286],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,800,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":878},{"i":4288,"cid":"23DO0054","pid":"P00737539LZ","t":"Rehabilitation of Drainage System at Lorenzo Compound, Barangay Guitnang Bayan II, San Mateo, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"T. REYES CONSTRUCTION","c":4750931.77,"abc":9900000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-08-21","lat":14.697797,"lon":121.123416,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guitnang Bayan II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3162},{"i":4289,"cid":"23D00051","pid":"P00726575LZ","t":"Construction of Flood Mitigation Structure at East Manggahan River, Phase 2, Barangay San Juan, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":106149488.0,"abc":106150000.0,"fy":"2023","sd":"03/31/2023","cd":"2024-04-15","lat":14.546619,"lon":121.123831,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"East Manggahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3163},{"i":4290,"cid":"23DO0049","pid":"P00737537LZ","t":"Construction of Drainage System, Barangay Dulongbayan - I, San Mateo, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PISTOL CONSTRUCTION AND SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-05-20","lat":14.701341,"lon":121.123973,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dulongbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3164},{"i":4291,"cid":"24ED0072","pid":"P00846101LZ","t":"Construction of Flood Mitigation Structure along Longos River (Downstream), Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ARCONIC INC.","c":19800000.0,"abc":19800000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-10","lat":13.3575,"lon":121.124444,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Longos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3165},{"i":4292,"cid":"23DD0208","pid":"P00742413LZ","t":"Construction of Riprap, Brgy. Lapolapo II, San Jose, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-09-26","lat":13.88106,"lon":121.12446,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lapolapo II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3166},{"i":4293,"cid":"23OB0212","pid":"P00727000LZ","t":"Construction of Slope Protection, Brgy. Fortune, Marikina City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":41879376.78,"abc":44099424.14,"fy":"2023","sd":"05/24/2023","cd":"2023-10-20","lat":14.668088,"lon":121.124813,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fortune","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3167},{"i":4294,"cid":"21DO0063","pid":"P00561569LZ","t":"Construction of Slope Protection, Barangay Guitnang Bayan I, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"San Mateo","deo":"Rizal 2nd District Engineering Office","co":"L. EUSEBIO ACE DEVELOPMENT CORPORATION","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-19","lat":14.6928,"lon":121.1259,"sm":1329,"fm":null,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guitnang Bayan I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3168},{"i":4295,"cid":"23BI0004","pid":"P00726141LZ","t":"Construction of San Fernando - Macate - Abinganan Flood Control along San Fernando River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-03","lat":16.406997,"lon":121.126064,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"San Fernando","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3169},{"i":4296,"cid":"24DN0046","pid":"P00820960LZ","t":"Construction of Flood Control Structure, Taytay River (Package 2), Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":19599554.7,"abc":19600000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-04","lat":14.559507,"lon":121.126372,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"Taytay","wn":"Taytay River","wd":0.0,"wp":[14.55951,121.12641],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3170},{"i":4297,"cid":"24BI0025","pid":"P00821191LZ","t":"Construction of Flood Control Structure along Magat River, Barangay Magsaysay, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-12-15","lat":16.47378,"lon":121.12694,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.26,"wp":[16.47251,121.12899],"wst":"matched","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3171},{"i":4298,"cid":"23DO0018","pid":"P00737541LZ","t":"Construction of Flood Control Structure at Sito Bungahan, Barangay Ampid II, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-03-27","lat":14.68284,"lon":121.126959,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ampid II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3172},{"i":4299,"cid":"21DO0061","pid":"P00561571LZ","t":"Construction of Slope Protection, Barangay Guitnang Bayan II, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"San Mateo","deo":"Rizal 2nd District Engineering Office","co":"C.E.M. CONSTRUCTION, INC.","c":4818684.46,"abc":4950000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-11-14","lat":14.6958,"lon":121.127,"sm":1329,"fm":null,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guitnang Bayan II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3173},{"i":4300,"cid":"22DI0011","pid":"P00620583LZ","t":"Construction of Revetment along Cabuyao River, Cabuyao City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CABUYAO CITY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":46037061.26,"abc":47470220.0,"fy":"2022","sd":"02/14/2022","cd":"2022-08-20","lat":14.28944,"lon":121.12709,"sm":282,"fm":282,"tm":282,"am":419,"md":0.01,"ls":"boundary","ww":"Cabuyao","wn":"Cabuyao River","wd":0.0,"wp":[14.28945,121.12708],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3174},{"i":4301,"cid":"22DN0124","pid":"P00637802LZ","t":"Drainage Rehabilitation, General Ricarte St., Brgy. San Juan, Cainta, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CAINTA (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"G.F. FABIAN CONSTRUCTION","c":9010591.78,"abc":9900000.0,"fy":"2022","sd":"06/14/2022","cd":"2023-01-29","lat":14.57914,"lon":121.12741,"sm":289,"fm":289,"tm":289,"am":289,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3175},{"i":4302,"cid":"24CF0012","pid":"P00821257LZ","t":"Construction of Flood Mitigation Structure along Pampanga River, Barangay Sapang Buho, Palayan City, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"PALAYAN CITY (CAPITAL) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":85114741.23,"abc":86849972.01,"fy":"2024","sd":"02/13/2024","cd":"2024-05-13","lat":15.5947,"lon":121.12746,"sm":1068,"fm":1068,"tm":1068,"am":1068,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":0.05,"wp":[15.59502,121.12783],"wst":"matched","br":"Sapang Buho","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3176},{"i":4303,"cid":"24ED0064","pid":"P00824748LZ","t":"Construction of Baruyan-Tabon-tabon Drainage System, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"TWENTY SIXTEEN CONSTRUCTION AND GENERAL MERCHANDISE","c":17963395.16,"abc":18146700.0,"fy":"2024","sd":"02/08/2024","cd":"2024-10-25","lat":13.38,"lon":121.1275,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":562},{"i":4304,"cid":"22DE0006","pid":"P00620558LZ","t":"Construction/Rehabilitation of Flood Control Structure at Brgy. Dela Paz, Pulot Aplaya, Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION / M.J. APIN BUILDERS","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-07-18","lat":13.633911,"lon":121.128741,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3177},{"i":4305,"cid":"23DC0074","pid":"P00725771LZ","t":"Construction of Flood Control Structures along Trapiche - Pagaspas, Tanauan City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF TANAUAN (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D / THREE W BUILDERS, INC.","c":96499118.98,"abc":96500000.0,"fy":"2023","sd":"03/09/2023","cd":"2024-08-21","lat":14.105696,"lon":121.129132,"sm":429,"fm":429,"tm":429,"am":429,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3178},{"i":4306,"cid":"22D00057","pid":"P00620219LZ","t":"Construction of Flood Mitigation Structure at East Manggahan River, Brgy. San Juan, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":102289850.0,"abc":102290000.0,"fy":"2022","sd":"03/23/2022","cd":"2023-11-30","lat":14.535869,"lon":121.130358,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"East Manggahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3179},{"i":4307,"cid":"22DN0062","pid":"P00620632LZ","t":"Construction of Flood Control Structure, Purok 2, Brgy. Cupang, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"T. REYES CONSTRUCTION","c":14699078.69,"abc":14700000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-07-21","lat":14.63798,"lon":121.13135,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cupang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3180},{"i":4308,"cid":"22OB0201","pid":"P00620078LZ","t":"Improvement along Nangka River, Left Side Facing Upstream, from Sta. 5+156.00 to Sta. 5+524.80","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":91630467.22,"abc":96499982.71,"fy":"2022","sd":"03/18/2022","cd":"2022-12-12","lat":14.664137,"lon":121.131446,"sm":403,"fm":403,"tm":null,"am":1329,"md":0.03,"ls":"boundary","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.66409,121.1314],"wst":"matched","br":null,"len":368.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3181},{"i":4309,"cid":"23OB0237","pid":"P00742229LZ","t":"River Improvement along Nangka River Phase 1, Nangka River, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":46525054.49,"abc":48999922.13,"fy":"2023","sd":"07/11/2023","cd":"2024-03-06","lat":14.663761,"lon":121.131621,"sm":403,"fm":403,"tm":403,"am":1329,"md":0.02,"ls":"boundary","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.6638,121.13166],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3182},{"i":4310,"cid":"24OB0180","pid":"P00821058LZ","t":"Construction of Slope Protection Along Pateros River, (Phase 1), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. BERNARDO CONST., INC.","c":70890893.2,"abc":72374571.93,"fy":"2024","sd":"02/13/2024","cd":"2024-09-09","lat":14.657348,"lon":121.131818,"sm":1521,"fm":1112,"tm":1521,"am":403,"md":12.89,"ls":"outside","ww":"Pateros","wn":"Pateros River","wd":13.06,"wp":[14.55772,121.06693],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":71,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.89,"text":"The pin is 12.9 km outside Taguig City, NCR, Fourth District, the nearest municipality the record claims. It falls in City of Marikina, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.72,"value":13.06,"text":"The title names Pateros, which OpenStreetMap maps through the stated municipality, but the pin is 13.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":47},{"i":4311,"cid":"22P00087","pid":"P00621003LZ","t":"Construction of Boliwong Flood Control Structure, Sta. 3+858-Sta. 3+900 and Sta. 4+869-Sta. 5+182, Lagawe, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"LAGAWE (CAPITAL) (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION","c":36551362.81,"abc":111608777.2,"fy":"2022","sd":"10/14/2022","cd":"2023-10-11","lat":16.8047,"lon":121.1319,"sm":733,"fm":733,"tm":733,"am":733,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":355.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3183},{"i":4312,"cid":"24BI0077","pid":"P00825234LZ","t":"Construction of San Fernando Section 2, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"CITRUS COUNTRY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"05/16/2024","cd":"2024-12-17","lat":16.387622,"lon":121.132145,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3184},{"i":4313,"cid":"23DE0012","pid":"P00742388LZ","t":"Construction of Box Culvert, Barangay Cumba, Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":8910000.0,"abc":8910000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-08-17","lat":13.684724,"lon":121.132428,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cumba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3185},{"i":4314,"cid":"23E00156","pid":"P00726953LZ","t":"Construction of Road Dike/Esplanade along Dulangan River, Sitio Sili, Barangay Metolza Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) / MACROPRIME BUILDERS CORPORATION (FORMERLY: MORANTE BUILDERS & SUPPLY)","c":289497725.2,"abc":289499999.8,"fy":"2023","sd":"03/29/2023","cd":"2023-12-15","lat":13.2681,"lon":121.1325,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":3.79,"wp":[13.2834,121.10118],"wst":"matched","br":"Metolza Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.79,"text":"The title names Dulangan, which OpenStreetMap maps through the stated municipality, but the pin is 3.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":272},{"i":4315,"cid":"23E00157","pid":"P00726954LZ","t":"Construction of Road Dike/Esplanade along Dulangan River, Sitio Centro V, Barangay Metolza Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) / FGO CONSTRUCTION","c":289497858.2,"abc":289499999.8,"fy":"2023","sd":"03/29/2023","cd":"2023-12-15","lat":13.2679,"lon":121.1327,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Dulangan","wn":"Dulangan River","wd":3.82,"wp":[13.2834,121.10118],"wst":"matched","br":"Metolza Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.82,"text":"The title names Dulangan, which OpenStreetMap maps through the stated municipality, but the pin is 3.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":273},{"i":4316,"cid":"22OB0202","pid":"P00620079LZ","t":"Improvement along Nangka River, Left Side Facing Upstream, from Sta. 5+524.80 to Sta. 5+893.60","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":91620467.22,"abc":96499982.71,"fy":"2022","sd":"03/17/2022","cd":"2022-12-11","lat":14.661801,"lon":121.132866,"sm":403,"fm":403,"tm":null,"am":1329,"md":0.01,"ls":"boundary","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.66177,121.13279],"wst":"matched","br":null,"len":368.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3186},{"i":4317,"cid":"22PB0024","pid":"P00637064LZ","t":"Construction of Madduang River Flood Control, Sta. 84+680-Sta. 84+835 (B/S), Kabugao, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION","c":24500000.0,"abc":24499413.08,"fy":"2022","sd":"04/04/2022","cd":"2023-03-28","lat":18.014944,"lon":121.133056,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Madduang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":155.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3187},{"i":4318,"cid":"23PB0017","pid":"P00726098LZ","t":"Construction of Madduang River Flood Control along Apayao-Abulug River Basin, Sta. 88 + 535 - Sta. 88 + 680 (L/S), Sta. 89 + 133 - Sta. 89 + 633 (R/S), Madduang, Kabugao, Apayao","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"PBO CONSTRUCTION COMPANY / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/06/2023","cd":"2023-11-22","lat":18.014881,"lon":121.133089,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Madduang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":645.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3188},{"i":4319,"cid":"22DI0021","pid":"P00620590LZ","t":"Construction/Improvement of Revetment along Tiway-Tiway River, Cabuyao City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CABUYAO CITY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"AARCON BUILDERS","c":47153622.93,"abc":47168380.0,"fy":"2022","sd":"02/14/2022","cd":"2022-11-28","lat":14.26742,"lon":121.13358,"sm":282,"fm":282,"tm":282,"am":282,"md":0.0,"ls":"inside","ww":"Tiway-Tiway","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3189},{"i":4320,"cid":"24DO0040","pid":"P00820298LZ","t":"Construction of Flood Control Structure along Nangka River, Barangay Silangan, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":144394880.0,"abc":144394880.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-15","lat":14.6531,"lon":121.13367,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":"Nangka","wn":"Nangka River","wd":0.01,"wp":[14.65303,121.13357],"wst":"matched","br":"Silangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3190},{"i":4321,"cid":"22DN0060","pid":"P00620255LZ","t":"Construction/Rehabilitation of Flood Control Structure at Bangiad Creek, (Phase 2), Sta. 0+120 - Sta. 0+580, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":57898640.09,"abc":57900000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-10-03","lat":14.536643,"lon":121.134127,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"Bangiad","wn":"Bangiad River","wd":0.02,"wp":[14.53665,121.13427],"wst":"matched","br":null,"len":460.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3191},{"i":4322,"cid":"24DN0041","pid":"P00820935LZ","t":"Construction of Flood Control Structure, Bangiad Creek (Package 3), Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":29399971.73,"abc":29400000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-05-28","lat":14.536708,"lon":121.134132,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"Bangiad","wn":"Bangiad River","wd":0.01,"wp":[14.53671,121.13426],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3192},{"i":4323,"cid":"22DN0078","pid":"P00620646LZ","t":"Construction/Rehabilitation of Flood Control Structures at Bangiad Creek, Taytay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":19599936.38,"abc":19600000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-08-24","lat":14.536473,"lon":121.134162,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.0,"ls":"inside","ww":"Bangiad","wn":"Bangiad River","wd":0.01,"wp":[14.53648,121.13428],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3193},{"i":4324,"cid":"24DI0027","pid":"P00839620LZ","t":"Construction of Drainage at Pulo National High School, Barangay Pulo, Cabuyao City, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CABUYAO CITY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":4949552.0,"abc":4950000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-22","lat":14.244894,"lon":121.13455,"sm":282,"fm":282,"tm":282,"am":282,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3194},{"i":4325,"cid":"23PK0034","pid":"P00726104LZ","t":"Construction of Flood Control at Kabiggen, Sta. 180 + 690 - Sta. 180 + 850 (RS), Western Uma, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"HKBT CONSTRUCTION","c":9794194.36,"abc":9800000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-10-06","lat":17.35029,"lon":121.13456,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":160.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3195},{"i":4326,"cid":"23D00181","pid":"P00740393LZ","t":"Construction of Slope Protection at Brgy. Dela Paz, Biñan City, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":96499005.06,"abc":96500000.0,"fy":"2023","sd":"07/25/2023","cd":"2024-04-22","lat":14.356411,"lon":121.084017,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3196},{"i":4327,"cid":"23DO0036","pid":"P00725841LZ","t":"Construction of Flood Control and Slope Protection Structure along Upper Marikina River, Barangay San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"EL-JAKE BUILDERS","c":48249216.48,"abc":48250000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-10-10","lat":14.736941,"lon":121.135571,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3197},{"i":4328,"cid":"24E00162","pid":"P00838538LZ","t":"Construction of Road Dike along Mag-asawang Tubig River, Barangay Barcenaga, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION","c":48246558.99,"abc":48249999.99,"fy":"2024","sd":"03/02/2024","cd":"2024-07-02","lat":13.27464,"lon":121.258361,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.01,"wp":[13.27454,121.25843],"wst":"matched","br":"Barcenaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3198},{"i":4329,"cid":"24BI0057","pid":"P00843256LZ","t":"Construction of Flood Control and Drainage Structure along Magat River, Tuao North Section, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":91675000.0,"abc":91675000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-24","lat":16.57088,"lon":121.25864,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.18,"wp":[16.56934,121.25911],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[4519,4232,4935,4256,4439],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":351},{"i":4330,"cid":"22DD0100","pid":"P00637792LZ","t":"Construction/Rehabilitation of Flood Mitigation Structures protecting Public Infrastructures/ Facilities at Barangay Quezon, Lipa City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"KENSAL RISE CONSTRUCTION","c":9603000.0,"abc":9900000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-05","lat":13.88975,"lon":121.13572,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3199},{"i":4331,"cid":"22DN0070","pid":"P00620643LZ","t":"Construction/Rehabilitation of Flood Control Structure at Angono River, Brgy. San Isidro, Angono, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"ANGONO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":19599984.21,"abc":19600000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-10-26","lat":14.53503,"lon":121.16245,"sm":62,"fm":62,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":"Angono","wn":"Angono River","wd":0.01,"wp":[14.53508,121.16251],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3200},{"i":4332,"cid":"24E00163","pid":"P00838539LZ","t":"Construction of Road Dike along Mag-asawang Tubig River, Barangay Pinagsabangan 2 - Barangay Motoderazo, Naujan, Oriental MIndoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION","c":48247759.16,"abc":48249999.99,"fy":"2024","sd":"03/02/2024","cd":"2024-07-02","lat":13.264525,"lon":121.258987,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.02,"wp":[13.26458,121.25883],"wst":"matched","br":"Pinagsabangan 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3201},{"i":4333,"cid":"23DN0083","pid":"P00727174LZ","t":"Construction of Flood Control Structure, Dau Creek, Brgy. San Luis, Antipolo City, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"TOP KMC CONSTRUCTION AND SUPPLY CORP.","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-08-23","lat":14.590477,"lon":121.205279,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Dau","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3202},{"i":4334,"cid":"22DN0061","pid":"P00620633LZ","t":"Construction of Flood Control Structure, Purok 3, Brgy. Cupang, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":14699456.57,"abc":14700000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-20","lat":14.64241,"lon":121.13614,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cupang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3203},{"i":4335,"cid":"23DI0007","pid":"P00726230LZ","t":"Construction of Revetment along San Juan River, Barangay 4, Calamba City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":44094608.57,"abc":44100000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-07-20","lat":14.215731,"lon":121.165111,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.21582,121.16508],"wst":"matched","br":"4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3204},{"i":4336,"cid":"23D00199","pid":"P00740391LZ","t":"Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":192977502.4,"abc":193000000.0,"fy":"2023","sd":"08/10/2023","cd":"2024-06-04","lat":14.776044,"lon":121.165497,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"StructuresLukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[4567,4681,4713,4755,4781,4788,4814,4821,4850,4852,4885],"L":"field","s":28,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":769},{"i":4337,"cid":"22DD0255","pid":"P00640552LZ","t":"Rehabilitation of Drainage System, Barangay Talisay, Lipa City, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"ALBANO CONSTRUCTION AND TRADING","c":9603459.0,"abc":9900000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-05","lat":13.97196,"lon":121.20554,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talisay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3205},{"i":4338,"cid":"23DO0023","pid":"P00726256LZ","t":"Construction of Flood Control Structure Along Manggahan River,(Sta. 1 + 600 - Sta. 2 + 350), Barangay Burgos, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":39346719.3,"abc":49000000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-09-11","lat":14.719812,"lon":121.136185,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan River","wd":0.0,"wp":[14.71978,121.13621],"wst":"matched","br":"Burgos","len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3206},{"i":4339,"cid":"22OC0024","pid":"P00620375LZ","t":"Rehabilitation/ Upgrading and Drainage Improvement along Santan St., Rosal St., and its Vicinity, Brgy. Pembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":3723510.28,"abc":3920000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-12-01","lat":14.542936,"lon":121.061271,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3207},{"i":4340,"cid":"21DO0044","pid":"P00561570LZ","t":"Construction of Slope Protection, Kamanawis Road, Sitio Tablon, Barangay Cuyambay, Tanay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Tanay","deo":"Rizal 2nd District Engineering Office","co":"GKB BUILDERS","c":1930317.07,"abc":1979963.98,"fy":"2021","sd":"09/05/2022","cd":"2022-12-14","lat":14.579219,"lon":121.344728,"sm":1541,"fm":null,"tm":1541,"am":1541,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cuyambay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3208},{"i":4341,"cid":"22OB0072","pid":"P00620006LZ","t":"Bank Improvement of Slope Protection along Marikina River (Package 3), Pasig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":88395424.56,"abc":93099467.03,"fy":"2022","sd":"02/16/2022","cd":"2023-10-17","lat":14.587178,"lon":121.084118,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.05,"wp":[14.58725,121.08363],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3209},{"i":4342,"cid":"22DI0018","pid":"P00620239LZ","t":"Construction of Revetment at Brgy. Bayog, Los Baños, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":86849261.05,"abc":86850000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-04-22","lat":14.18709,"lon":121.25915,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3210},{"i":4343,"cid":"23BJ0030","pid":"P00725677LZ","t":"Construction of Flood Control along Manga River, Bitnong Section, Dupax del Norte, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"DUPAX DEL NORTE (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":96472643.42,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-09-30","lat":16.30027,"lon":121.16555,"sm":543,"fm":543,"tm":543,"am":543,"md":0.0,"ls":"inside","ww":"Manga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3211},{"i":4344,"cid":"23PK0006","pid":"P00726664LZ","t":"Construction of Flood Control (liglig GIIPO) along Chico River, Sta. 169 + 650 - Sta. 169 + 950 (RS), Barangay Tanglag, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"HKBT CONSTRUCTION","c":16609960.78,"abc":16660000.0,"fy":"2023","sd":"02/21/2023","cd":"2024-02-15","lat":17.36686,"lon":121.20575,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.04,"wp":[17.36672,121.20606],"wst":"matched","br":"Tanglag","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3212},{"i":4345,"cid":"24CD0054","pid":"P00820232LZ","t":"Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498249.74,"abc":96499803.98,"fy":"2024","sd":"02/14/2024","cd":"2024-12-05","lat":14.779518,"lon":121.061724,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"San Jose","wn":"San Jose Creek","wd":23.85,"wp":[14.56441,121.04834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3213},{"i":4346,"cid":"24ED0093","pid":"P00825248LZ","t":"Construction of Flood Mitigation along Bucayao River Sitio Barucan, Brgy. San Luis, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON / REVERE CONSTRUCTION & SUPPLY CORPORATION (FORMERLY","c":48999973.92,"abc":49000000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-05-14","lat":13.231111,"lon":121.136944,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao River","wd":0.13,"wp":[13.23227,121.13675],"wst":"matched","br":"San Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3214},{"i":4347,"cid":"22OF0025","pid":"P00620443LZ","t":"Construction of Flood Control Structure and Tributaries along Culiat Creek (Right Side) Barangay Vasra, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"02/07/2022","cd":"2023-01-03","lat":14.684501,"lon":121.084489,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Culiat","wn":"Culiat Creek","wd":4.81,"wp":[14.65443,121.05227],"wst":"matched","br":"Vasra","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.81,"text":"The title names Culiat, which OpenStreetMap maps through the stated municipality, but the pin is 4.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":358},{"i":4348,"cid":"22DO0028","pid":"P00632919LZ","t":"Construction of Slope Protection Structure, Barangay Lubo, Jala-jala, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"JALA-JALA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"KING EIGHT BUILDERS AND SUPPLY","c":29700000.0,"abc":29700000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-08-12","lat":14.325556,"lon":121.348611,"sm":661,"fm":661,"tm":661,"am":661,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lubo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3215},{"i":4349,"cid":"23DI0017","pid":"P00725821LZ","t":"Construction of Revetment at Barangay Maahas, Los Baños, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":72352314.41,"abc":72375000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-01-12","lat":14.187359,"lon":121.25945,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maahas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3216},{"i":4350,"cid":"23PK0035","pid":"P00726103LZ","t":"Construction of Manangol (Tokje) Mabilong Flood Control and Drainage, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"SONBLESSED CONSTRUCTION AND SUPPLY","c":4894091.75,"abc":4900000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-10-29","lat":17.32779,"lon":121.16556,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3217},{"i":4351,"cid":"23OC0015","pid":"P00725976LZ","t":"Construction of Box Culvert along Xyris Creek, Makati City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"LIZVIL CONSTRUCTION & SUPPLY","c":5880000.0,"abc":5880000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-23","lat":14.541059,"lon":121.061732,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":"Xyris","wn":"Xyris Creek","wd":0.0,"wp":[14.5411,121.06174],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3218},{"i":4352,"cid":"23DI0059","pid":"P00725799LZ","t":"Construction of River Protection Structure along Mayapa Waterways, Brgy. Paciano, Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JUSTBILT BUILDERS","c":47041826.24,"abc":48250000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-10-16","lat":14.21249,"lon":121.13721,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paciano","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3219},{"i":4353,"cid":"22DI0152","pid":"P00631300LZ","t":"Construction of Flood Control Project, Bay Lakeshore Protection - Kabaritan Sto. Domingo Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":19599339.02,"abc":19600000.0,"fy":"2022","sd":"01/09/2023","cd":"2023-12-11","lat":14.19035,"lon":121.2603,"sm":192,"fm":192,"tm":null,"am":192,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3220},{"i":4354,"cid":"24PM0020","pid":"P00821549LZ","t":"Construction of Sikut Flood Control, Bunot, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / J.M. DAPING CONSTRUCTION SERVICES","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/15/2024","cd":"2025-03-02","lat":17.20864,"lon":121.34966,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3221},{"i":4355,"cid":"22PK0019","pid":"P00621019LZ","t":"Construction of Manangol Flood Control Sta. 179+350 - Sta. 179+450 (R.S.), Mabilong, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"ROCKWELL BUILDERS","c":4605589.49,"abc":4900000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-12","lat":17.32812,"lon":121.1656,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3222},{"i":4356,"cid":"25ED0055","pid":"P00921803LZ","t":"Construction of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"CEFF TRADING & ENGINEERING SERVICES","c":19299949.9,"abc":19600000.0,"fy":"2025","sd":"03/13/2025","cd":"2025-05-27","lat":13.319722,"lon":121.205833,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.1,"wp":[13.3188,121.20569],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3223},{"i":4357,"cid":"24DI0049","pid":"P00824725LZ","t":"Construction of Slope Protection at Barangay Ganado, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":29268232.7,"abc":29400000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-11-18","lat":14.28626,"lon":121.084614,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ganado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3224},{"i":4358,"cid":"22DQ0106","pid":"P00644780LZ","t":"Repair/Rehabilitation of Carmona River Revetment, Cavite","w":"Construction of Revetment","rg":"Region IV-A","pv":"CAVITE","mu":"CITY OF CARMONA (CAVITE)","deo":"Cavite 3rd District Engineering Office","co":"OMNICON BUILDERS","c":9649872.27,"abc":9649964.16,"fy":"2022","sd":"02/21/2023","cd":"2023-06-14","lat":14.308894,"lon":121.06185,"sm":343,"fm":343,"tm":360,"am":343,"md":0.0,"ls":"inside","ww":"Carmona","wn":"Carmona River","wd":0.01,"wp":[14.30887,121.0619],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.34,"text":"The record contradicts itself: the municipality field and the pin point to Carmona, Cavite, but the title names Cavite City, Cavite, 24 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":626},{"i":4359,"cid":"22DI0111","pid":"P00640560LZ","t":"Rehabilitation of Drainage System along Barangay VI, Barangay VII, Barangay Linnga, Barangay Milagros and Barangay Mapagong, Calamba City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"FOURTH GENERATION T CONSTRUCTION","c":7408126.25,"abc":7425000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-02-05","lat":14.17397,"lon":121.13735,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"VI","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3225},{"i":4360,"cid":"22D00086","pid":"P00639380LZ","t":"Construction of River Protection Structure, Brgy. Maahas, Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"515 LIFE CONSTRUCTION CORP. / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":144748520.5,"abc":144750000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-07","lat":14.166006,"lon":121.26056,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maahas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3226},{"i":4361,"cid":"21PK0010","pid":"P00525929LZ","t":"Completion of Wangwang Flood Control Sta. 170+000 - Sta 170+060 (L.S.), Dangtalan, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES","c":2895749.57,"abc":2940000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-08-06","lat":17.386943,"lon":121.165954,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3227},{"i":4362,"cid":"23PB0002","pid":"P00726654LZ","t":"Construction of Badduat River Flood Control along Apayao-Abulug River Basin, Sta. 83 + 292 - Sta. 83 + 532, Kabugao, Apayao","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"TAGEL CORPORATION / E.C.V. CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/19/2023","cd":"2023-09-08","lat":17.982131,"lon":121.206292,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Badduat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3228},{"i":4363,"cid":"24DI0022","pid":"P00820893LZ","t":"Construction of River Protection Structure at Sta. Rosa River, near Coca Cola, Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":47946089.1,"abc":49000000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-10-13","lat":14.285911,"lon":121.084706,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":"Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3229},{"i":4364,"cid":"23ED0030","pid":"P00727188LZ","t":"Construction of Bucayao River Control along Brgy. Managpi, Sta. 0 + 000 - Sta. 0 + 172.48, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"E.S.L. BUILDERS & PARTS SUPPLY","c":38599996.6,"abc":38600000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-09-18","lat":13.31833,"lon":121.2069,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.0,"wp":[13.31834,121.2069],"wst":"matched","br":"Managpi","len":172.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3230},{"i":4365,"cid":"22DC0042","pid":"P00632869LZ","t":"Construction of Drainage Structure at Purok 3, Barangay San Rafael, Sto. Tomas, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"KEASCIA CONSTRUCTION & SUPPLY","c":4948062.6,"abc":4950000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-08-02","lat":14.129112,"lon":121.137675,"sm":1419,"fm":1419,"tm":1419,"am":1419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Rafael","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3231},{"i":4366,"cid":"23OB0338","pid":"P00742236LZ","t":"Upgrading of Drainage System at Jacinto St., Orellana St., Llamera St., Marinduque St., Franco St. at Barangay New Lower Bicutan, Taguig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"RGDG CONSTRUCTION","c":9309670.78,"abc":9799659.05,"fy":"2023","sd":"06/08/2023","cd":"2023-12-04","lat":14.503497,"lon":121.061884,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Lower Bicutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3232},{"i":4367,"cid":"24BI0048","pid":"P00823344LZ","t":"Construction of Buliwao Flood Control Structure, Angadanan River, Buliwao, Quezon, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"QUEZON (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-08-22","lat":16.502724,"lon":121.261207,"sm":1186,"fm":1186,"tm":1186,"am":1186,"md":0.0,"ls":"inside","ww":"Angadanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3233},{"i":4368,"cid":"23BI0018","pid":"P00726708LZ","t":"Rehabilitation of Flood Control Structure along Magat River, Santa Rosa Section, Bayombong, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"ERIC VAN P. SESBRENO CONSTRUCTION / V.B. GINES CONSTRUCTION","c":47326160.0,"abc":47326160.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-17","lat":16.480572,"lon":121.165983,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.03,"wp":[16.48035,121.16619],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3234},{"i":4369,"cid":"21OB0208","pid":"P00561148LZ","t":"Construction of RCBC Drainaige Line and Road Widening at Tawiran St., Santolan, Pasig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"City of Pasig","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":7445274.05,"abc":7839606.24,"fy":"2021","sd":"02/24/2022","cd":"2022-10-26","lat":14.609,"lon":121.085,"sm":412,"fm":null,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3235},{"i":4370,"cid":"24ED0026","pid":"P00821604LZ","t":"Construction of Bucayao River Control at Managpi Section, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"E.S.L. BUILDERS & PARTS SUPPLY","c":29399981.95,"abc":29400000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-15","lat":13.3175,"lon":121.207778,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.03,"wp":[13.31739,121.20749],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3236},{"i":4371,"cid":"22DN0026","pid":"P00620257LZ","t":"Rehabilitation of Flood Control Structure, Brgy. Mambugan and Brgy. Muntindilaw, Antipolo City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL / BELL CONSTRUCTION","c":93122063.22,"abc":93122500.0,"fy":"2022","sd":"03/02/2022","cd":"2023-03-26","lat":14.60707,"lon":121.13843,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3237},{"i":4372,"cid":"23OB0323","pid":"P00740503LZ","t":"Construction/Improvement of Drainage System, Brgy. New Lower Bicutan, Taguig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":46549971.18,"abc":48999969.67,"fy":"2023","sd":"06/05/2023","cd":"2024-02-26","lat":14.505035,"lon":121.06201,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Lower Bicutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3238},{"i":4373,"cid":"22DN0030","pid":"P00620649LZ","t":"Rehabilitation/Slope Protection of Sitio Paenaan River, along Marikina-Infanta Road (Upstream Phase 5), Brgy. San Jose, Antipolo City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48999785.01,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2023-03-12","lat":14.625605,"lon":121.261253,"sm":365,"fm":365,"tm":365,"am":160,"md":0.11,"ls":"boundary","ww":"Sitio Paenaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":"Phase 5","dup":[],"run":[4851,4630],"cl":[4544,4550,4571,4609,4630,4635,4731,4738,4851],"L":"field","s":48,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0028 to 22DN0032) cover the same site, together worth PHP 127,226,749.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":112},{"i":4374,"cid":"23OB0117","pid":"P00725520LZ","t":"Construction of Slope Protection at Conga Creek, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"FRANZCOR TRADING & CONSTRUCTION","c":87090824.84,"abc":91674552.46,"fy":"2023","sd":"05/05/2023","cd":"2023-11-15","lat":14.505012,"lon":121.06202,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Conga","wn":"Conga Creek","wd":0.0,"wp":[14.50501,121.06203],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3239},{"i":4375,"cid":"22DP0024","pid":"P00620591LZ","t":"Construction of Slope Protection along Malamig River at Brgy. Concepcion, San Pablo City, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SAN PABLO CITY (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-03-24","lat":14.076309,"lon":121.349766,"sm":1346,"fm":1346,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":"Malamig","wn":"Malamig River","wd":0.0,"wp":[14.07629,121.34979],"wst":"matched","br":"Concepcion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3240},{"i":4376,"cid":"24BI0037","pid":"P00825236LZ","t":"Rehabilitation of Flood Control Structure along Magat River (Phase 2), Barangay Sta. Rosa, Bayombong, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-05-15","lat":16.48055,"lon":121.166,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.03,"wp":[16.48035,121.16619],"wst":"matched","br":"Sta. Rosa","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3241},{"i":4377,"cid":"23PB0014","pid":"P00726653LZ","t":"Construction of Badduat River Flood Control along Apayao-Abulug River Basin (Upstream), Sta. 83 + 232 - Sta. 83 + 292, Kabugao, Apayao","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"CMG JR. BUILDERS / PRIME MASTER CONST. AND DEV'T. CORP.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/06/2023","cd":"2023-12-07","lat":17.983667,"lon":121.207831,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Badduat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3242},{"i":4378,"cid":"22DO0067","pid":"P00639375LZ","t":"Construction of Flood Control Structure along Upper Marikina River (Phase III, R/S), Brgy. San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"KAEL CONSTRUCTION AND SUPPLY","c":94464205.36,"abc":96500000.0,"fy":"2022","sd":"10/12/2022","cd":"2023-03-27","lat":14.736389,"lon":121.138611,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3243},{"i":4379,"cid":"22PM0018","pid":"P00620483LZ","t":"Construction of Drainage System, Sta. 134+009 - Sta. 134+607, Butac, Natonin, Mountain Province","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"NATONIN (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"05/26/2022","cd":"2023-04-13","lat":17.09667,"lon":121.26139,"sm":1016,"fm":1016,"tm":1016,"am":1016,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":598.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3244},{"i":4380,"cid":"23OD0214","pid":"P00727013LZ","t":"Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":47813558.33,"abc":48989301.01,"fy":"2023","sd":"06/07/2023","cd":"2023-12-27","lat":14.762058,"lon":121.062214,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Camarin","wn":"Camarin Creek","wd":1.27,"wp":[14.75057,121.06209],"wst":"matched","br":"178","len":223.0,"ph":null,"dup":[4383],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 95,656,221.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":921},{"i":4381,"cid":"24OB0092","pid":"P00824591LZ","t":"Rehabilitation of Drainage System along San Agustin Avenue including Vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"EDELSONS BUILDERS INC.","c":19198671.1,"abc":19599818.2,"fy":"2024","sd":"04/08/2024","cd":"2024-11-16","lat":14.559143,"lon":121.085257,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3245},{"i":4382,"cid":"23D00067","pid":"P00725788LZ","t":"Construction of Revetment at Brgy. Maahas, Phase2, Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"D.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: / TRIPLE EAGLE CONSTRUCTION AND TRADING","c":154399847.9,"abc":154400000.0,"fy":"2023","sd":"03/31/2023","cd":"2024-06-22","lat":14.171394,"lon":121.261594,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maahas","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3246},{"i":4383,"cid":"23OD0215","pid":"P00727014LZ","t":"Construction of Flood Control Wall along Camarin Creek (Right Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":47842662.41,"abc":48994208.21,"fy":"2023","sd":"06/07/2023","cd":"2023-11-06","lat":14.762058,"lon":121.062214,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":"Camarin","wn":"Camarin Creek","wd":1.27,"wp":[14.75057,121.06209],"wst":"matched","br":"178","len":223.0,"ph":null,"dup":[4380],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 95,656,221.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":922},{"i":4384,"cid":"23DD0149","pid":"P00727371LZ","t":"Construction of Revetment along Lawaya River (Palahanan 2 Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/11/2023","cd":"2023-09-18","lat":13.82709,"lon":121.35065,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3247},{"i":4385,"cid":"22ED0011","pid":"P00621112LZ","t":"Construction of Flood Mitigating Structure along Mag-Asawang Tubig River, Sta. 0+000 - Sta. 0+242 U/S, Sta. 0+000 - Sta. 0+123 D/S, San Andres Putik, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":48999957.5,"abc":49000000.0,"fy":"2022","sd":"05/23/2022","cd":"2022-12-09","lat":13.13361,"lon":121.1661,"sm":1017,"fm":1017,"tm":1017,"am":1629,"md":0.03,"ls":"boundary","ww":"Mag-Asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.25,"wp":[13.13261,121.16407],"wst":"matched","br":null,"len":365.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3248},{"i":4386,"cid":"22DE0036","pid":"P00631285LZ","t":"Construction of Flood Control Structure at Brgy. Lagadlarin-Downstream, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-01-02","lat":13.6394,"lon":121.2086,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lagadlarin-Downstream","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3249},{"i":4387,"cid":"22DN0081","pid":"P00620639LZ","t":"Construction of Slope Protection Structure, Patoto Creek, Taytay, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TAYTAY (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":27343115.77,"abc":29400000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-09-26","lat":14.533733,"lon":121.139126,"sm":1556,"fm":1556,"tm":1556,"am":1556,"md":0.02,"ls":"boundary","ww":"Patoto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3250},{"i":4388,"cid":"24BI0062","pid":"P00823343LZ","t":"Construction of Nalubbunan Flood Control Structure, Angadanan River, Nalubbunan, Quezon, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"QUEZON (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-07-15","lat":16.50333,"lon":121.261863,"sm":1186,"fm":1186,"tm":1186,"am":1186,"md":0.0,"ls":"inside","ww":"Angadanan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3251},{"i":4389,"cid":"22DD0070","pid":"P00621093LZ","t":"Construction of Flood Mitigation Structure along Lawaye River, Barangay Palahanan 2.0, San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"FIVE TRAVELLERS CONSTRUCTION INC.","c":27569128.0,"abc":28420000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-08-07","lat":13.82699,"lon":121.35106,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.0,"wp":[13.82702,121.35106],"wst":"matched","br":"Palahanan 2.0","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3252},{"i":4390,"cid":"23DI0009","pid":"P00725819LZ","t":"Construction of River Protection Structure along San Cristobal River, (near PNR), Barangay Bañadero, Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MSV CONSTRUCTION AND SUPPLIES","c":84765670.0,"abc":86850000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-02-08","lat":14.225631,"lon":121.167031,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.01,"wp":[14.22568,121.16701],"wst":"matched","br":"Bañadero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3253},{"i":4391,"cid":"23CD0069","pid":"P00725718LZ","t":"Construction of Flood Control Structure, Sto Cristo River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96497180.56,"abc":96499232.45,"fy":"2023","sd":"03/01/2023","cd":"2023-12-29","lat":14.831489,"lon":121.062386,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Sto Cristo","wn":"Santo Cristo Creek","wd":19.78,"wp":[14.65788,121.01883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3254},{"i":4392,"cid":"23BI0010","pid":"P00726142LZ","t":"Rehabilitation of Flood Control along Cupas River, San Leonardo Section, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-08-20","lat":16.39635,"lon":121.085906,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Cupas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3255},{"i":4393,"cid":"24DN0080","pid":"P00839647LZ","t":"Construction of Slope Protection Structure along Creek at Sitio Calvon, Barangay Mambog, Binangonan, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FRANZCOR TRADING & CONSTRUCTION","c":4949917.86,"abc":4950000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-03-25","lat":14.478089,"lon":121.210049,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3256},{"i":4394,"cid":"23D00076","pid":"P00736028LZ","t":"Construction of River Protection Structure, Barangay Maahas, Los Baños, Laguna, Package A","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":96499864.97,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-05","lat":14.173403,"lon":121.263922,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maahas","len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3257},{"i":4395,"cid":"24CF0113","pid":"P00846000LZ","t":"Construction of  Flood Mitigation Structures Slope protection / Drainage Canal, Brgy. Lusok, Bongabon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"BONGABON (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":5791723.38,"abc":5879917.65,"fy":"2024","sd":"06/04/2024","cd":"2024-10-15","lat":15.600294,"lon":121.139203,"sm":222,"fm":222,"tm":222,"am":222,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lusok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3258},{"i":4396,"cid":"24EI0072","pid":"P00825249LZ","t":"Construction of Banus River Control, Barangay Malayong-Barangay Manguyang Section, Gloria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"GLORIA (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48997248.42,"abc":49000000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-12-04","lat":12.382222,"lon":121.351583,"sm":589,"fm":589,"tm":589,"am":249,"md":55.93,"ls":"outside","ww":"Banus","wn":"Banus River","wd":56.99,"wp":[12.89422,121.4093],"wst":"matched","br":"Malayong-Barangay Manguyang Section","len":null,"ph":null,"dup":[4405],"run":[],"cl":[],"L":"records","s":79,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":55.93,"text":"The pin is 55.9 km outside Gloria, Oriental Mindoro, the nearest municipality the record claims. It falls in Bulalacao, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":56.99,"text":"The title names Banus, which OpenStreetMap maps through the stated municipality, but the pin is 57.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 78,394,361.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":21},{"i":4397,"cid":"23CD0067","pid":"P00725717LZ","t":"Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498078.58,"abc":96499459.47,"fy":"2023","sd":"03/01/2023","cd":"2024-01-18","lat":14.77566,"lon":121.06239,"sm":416,"fm":416,"tm":416,"am":308,"md":0.01,"ls":"boundary","ww":"San Jose","wn":"San Jose Creek","wd":23.43,"wp":[14.56441,121.04834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3259},{"i":4398,"cid":"19O00034","pid":"P00320013LZ","t":"Construction (Completion) of Marikina River Drainage Outfall, Brgy. J. Dela Peña, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"C.S.L. CONSTRUCTION CORPORATION / ST. TIMOTHY CONSTRUCTION CORPORATION","c":94907798.15,"abc":94953904.49,"fy":"2019","sd":"11/21/2019","cd":"2022-11-25","lat":14.632371,"lon":121.086296,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.3,"wp":[14.62998,121.08504],"wst":"matched","br":"J. Dela Peña","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3260},{"i":4399,"cid":"22OB0094","pid":"P00620021LZ","t":"Construction of Drainage Outfall Including Laterals At Brgy. New Lower Bicutan, Taguig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":70930048.4,"abc":72374547.54,"fy":"2022","sd":"03/21/2022","cd":"2024-01-12","lat":14.505034,"lon":121.062478,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Lower Bicutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3261},{"i":4400,"cid":"23DN0076","pid":"P00737531LZ","t":"Construction of Breakwater, Barangay Pipindan, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":9899996.75,"abc":9900000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-16","lat":14.420211,"lon":121.210983,"sm":206,"fm":206,"tm":206,"am":206,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pipindan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3262},{"i":4401,"cid":"23DO0072","pid":"P00737535LZ","t":"Rehabilitation of Flood Control Structure, Barangay Maly, San Mateo, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"22 PRIME CONSTRUCTION AND REALTY DEVELOPMENT INC.","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-10-01","lat":14.71004,"lon":121.139925,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maly","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3263},{"i":4402,"cid":"23CF0058","pid":"P00726172LZ","t":"Construction of Flood Control Structure (Gabion) at Calaanan River Labi Section, Bongabon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"BONGABON (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":48990841.52,"abc":48999974.43,"fy":"2023","sd":"02/10/2023","cd":"2023-10-27","lat":15.6447,"lon":121.2642,"sm":222,"fm":222,"tm":222,"am":222,"md":0.0,"ls":"inside","ww":"Calaanan","wn":"Calaanan River","wd":0.1,"wp":[15.64537,121.26481],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3264},{"i":4403,"cid":"23DN0084","pid":"P00726249LZ","t":"Construction of Flood Control Structure with Box Culvert, Barangay Sta. Cruz, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"STREAMLINE BUILDERS CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"04/10/2023","cd":"2024-01-04","lat":14.615329,"lon":121.167098,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3265},{"i":4404,"cid":"22DI0127","pid":"P00621463LZ","t":"Construction of River Protection of Biñan River along Barangay Casile and Barangay Malaban, Phase II, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48930644.27,"abc":49000000.0,"fy":"2022","sd":"08/08/2022","cd":"2023-12-23","lat":14.34243,"lon":121.08631,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Biñan","wn":"Biñan River","wd":0.02,"wp":[14.34262,121.08633],"wst":"matched","br":"Casile","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3266},{"i":4405,"cid":"24EI0079","pid":"P00844781LZ","t":"Construction of Cavillan River Waterway Enhancement Structure (Nasukob Section), along Sitio Cavillan, Barangay Nasukob, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":29397112.52,"abc":29400000.0,"fy":"2024","sd":"04/03/2024","cd":"2024-09-19","lat":12.382222,"lon":121.351583,"sm":249,"fm":249,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":"Cavillan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nasukob","len":null,"ph":null,"dup":[4396],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 78,394,361.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":197},{"i":4406,"cid":"24CD0172","pid":"P00844754LZ","t":"Construction of Slope Protection Structure, Area G, San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48989112.33,"abc":48999992.68,"fy":"2024","sd":"04/30/2024","cd":"2024-12-17","lat":14.849679,"lon":121.062511,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3267},{"i":4407,"cid":"24BI0009","pid":"P00821178LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2025-04-11","lat":16.5901,"lon":121.2648,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.46,"wp":[16.59208,121.26858],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[4230,4229],"cl":[],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24BI0007 to 24BI0009) cover the same site, together worth PHP 434,250,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":188},{"i":4408,"cid":"21DO0055","pid":"P00561800LZ","t":"Construction of Riprap in Bautista Creek Banlik Sub Urban Village, San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":29700000.0,"abc":35640000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-15","lat":14.755,"lon":121.1403,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Bautista","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3268},{"i":4409,"cid":"23DC0043","pid":"P00726205LZ","t":"Rehabilitation of Slope Protection along Cabaong Br. (B04540LZ) - along Santo Tomas, Batangas","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"VAN MAKJAY CONSTRUCTION","c":29398381.6,"abc":29400000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-10-11","lat":14.094913,"lon":121.167336,"sm":1419,"fm":1419,"tm":180,"am":1419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":28.85,"text":"The record contradicts itself: the municipality field and the pin point to Santo Tomas, Batangas, but the title names Batangas City, Batangas, 29 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":585},{"i":4410,"cid":"24DI0082","pid":"P00846067LZ","t":"Construction of Drainage, Brgy. Prinza, Calamba City, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"DATZLAV CONSTRUCTION","c":4836150.0,"abc":4950000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-08-18","lat":14.200636,"lon":121.140481,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Prinza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3269},{"i":4411,"cid":"23E00204","pid":"P00740430LZ","t":"Construction of Flood Control Structure along Cavillan River Upstream, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":202647244.3,"abc":202649905.8,"fy":"2023","sd":"04/13/2023","cd":"2023-12-10","lat":12.3842,"lon":121.352,"sm":249,"fm":249,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":"Cavillan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3270},{"i":4412,"cid":"23OB0073","pid":"P00725965LZ","t":"Rehabilitation of Drainage System along E. Santos St., Barangay Pinagbuhatan and vicinity, Paslg City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ANDREW LOUIS CONSTRUCTION AND TRADING","c":6514929.4,"abc":6859264.48,"fy":"2023","sd":"02/06/2023","cd":"2023-05-06","lat":14.561398,"lon":121.086359,"sm":412,"fm":412,"tm":null,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4429,4899,4189,4981,4854,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4429,4564,4854,4884,4899,4932,4981],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":189},{"i":4413,"cid":"23CD0062","pid":"P00725720LZ","t":"Construction of Flood Control Structure along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road San Jose River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498410.9,"abc":96499928.13,"fy":"2023","sd":"03/01/2023","cd":"2024-02-27","lat":14.775581,"lon":121.062523,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Ipo Dam Road San Jose","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3271},{"i":4414,"cid":"23DO0046","pid":"P00742448LZ","t":"Construction of Stone Masonry Wall along Morong River, Brgy. Bombongan, Morong, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MORONG (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GKB BUILDERS","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-08-12","lat":14.512151,"lon":121.212074,"sm":991,"fm":991,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":"Morong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bombongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3272},{"i":4415,"cid":"24BI0015","pid":"P00821183LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/21/2024","cd":"2025-04-10","lat":16.59018,"lon":121.26486,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.45,"wp":[16.59211,121.26856],"wst":"matched","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3273},{"i":4416,"cid":"23ED0066","pid":"P00742455LZ","t":"Construction of Drainage Canal at So. Green Valley, Lalud, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"E.S.L. BUILDERS & PARTS SUPPLY","c":4948415.62,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-26","lat":13.40028,"lon":121.1675,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3274},{"i":4417,"cid":"22DD0135","pid":"P00640545LZ","t":"Construction of Drainage System, Brgys. Lodlod, Pagolingin Bata and San Sebastian, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"KENSAL RISE CONSTRUCTION","c":24007500.0,"abc":24750000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-10-10","lat":13.92979,"lon":121.14053,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3275},{"i":4418,"cid":"22PC0068","pid":"P00620990LZ","t":"Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 440 - Sta. 1 + 400, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":47169843.01,"abc":49000000.0,"fy":"2022","sd":"08/09/2022","cd":"2023-11-15","lat":18.53715,"lon":121.08638,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":960.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3276},{"i":4419,"cid":"22CD0210","pid":"P00637028LZ","t":"Construction of Flood Control Structure, Barangay Bagong Buhay, City of San Jose del Monte, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":95051178.88,"abc":96499638.45,"fy":"2022","sd":"05/26/2022","cd":"2023-04-25","lat":14.85222,"lon":121.06258,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Buhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3277},{"i":4420,"cid":"24BI0034","pid":"P00821180LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"SOLANO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-05-21","lat":16.50232,"lon":121.212397,"sm":1477,"fm":1477,"tm":1477,"am":1186,"md":0.08,"ls":"boundary","ww":"Magat","wn":"Magat River","wd":0.0,"wp":[16.50229,121.21237],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3278},{"i":4421,"cid":"22DI0079","pid":"P00620238LZ","t":"Construction of Revetment along Tabon Waterways, (Maahas side), Brgy. Maahas, Los Banos,Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":86813738.33,"abc":86850000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-11-18","lat":14.17968,"lon":121.26525,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maahas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3279},{"i":4422,"cid":"22DI0136","pid":"P00621462LZ","t":"Construction of River Protection of Biñan River along Barangay Casile and Barangay Malaban, Phase I, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"STRUKTURA TEKNIKA SERVICES CO. / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48994674.47,"abc":49000000.0,"fy":"2022","sd":"08/22/2022","cd":"2023-12-23","lat":14.34588,"lon":121.08646,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Biñan","wn":"Biñan River","wd":0.04,"wp":[14.34589,121.08608],"wst":"matched","br":"Casile","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3280},{"i":4423,"cid":"23BC0094","pid":"P00740573LZ","t":"Construction of River Dike Control at Cabaggan Bridge, Pamplona , Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PAMPLONA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OLIVA DESIGN AND CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"04/27/2023","cd":"2024-01-31","lat":18.49634,"lon":121.35387,"sm":1074,"fm":1074,"tm":1074,"am":1074,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3281},{"i":4424,"cid":"23DD0092","pid":"P00742397LZ","t":"Construction of Box Culvert in Brgy. San Agustin, Ibaan, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"IBAAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":4801678.25,"abc":4950000.0,"fy":"2023","sd":"04/02/2023","cd":"2023-07-07","lat":13.82159,"lon":121.16753,"sm":628,"fm":628,"tm":628,"am":628,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3282},{"i":4425,"cid":"22DO0010","pid":"P00621102LZ","t":"Construction of Flood Control Structure Along Upper Marikina River, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING)","c":48509990.21,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-11-07","lat":14.736389,"lon":121.140556,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3283},{"i":4426,"cid":"23CD0063","pid":"P00725721LZ","t":"Construction of Flood Control Structure along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Santo Cristo River, San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96497264.42,"abc":96499375.83,"fy":"2023","sd":"03/01/2023","cd":"2023-12-29","lat":14.82898,"lon":121.06261,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Ipo Dam Road Santo Cristo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3284},{"i":4427,"cid":"24DO0056","pid":"P00820317LZ","t":"Construction of Flood Mitigation Structure along Teresa River, Barangay May-Iba, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"A.M. ORETA & CO., INC.","c":91675000.0,"abc":91675000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-02-11","lat":14.5719,"lon":121.21311,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.06,"wp":[14.57185,121.2137],"wst":"matched","br":"May-Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3285},{"i":4428,"cid":"24BI0021","pid":"P00821181LZ","t":"Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva Viscaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-05-21","lat":16.637459,"lon":121.26532,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.44,"wp":[16.63437,121.2679],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3286},{"i":4429,"cid":"23OB0074","pid":"P00725964LZ","t":"Rehabilitation of Drainage System along Esguerra St., Barangay Pinagbuhatan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":7910500.0,"abc":8329756.25,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.557208,"lon":121.086686,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4899,4189,4981,4854,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4564,4854,4884,4899,4932,4981],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":190},{"i":4430,"cid":"23DD0101","pid":"P00742402LZ","t":"Construction of Slope Protection in Brgys. Hugom and Laiya Ibabao, San Juan, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MEGAJES CONSTRUCTION CORP.","c":7682785.0,"abc":7920000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-07-03","lat":13.65801,"lon":121.35826,"sm":1311,"fm":1311,"tm":1311,"am":803,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3287},{"i":4431,"cid":"21PK0060","pid":"P00525938LZ","t":"Completion of Balbalan Central School Drainage Systems Sta. 147+900 - Sta. 148+100 (B.S.), Salegseg, Balbalan, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Balbalan","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":1905025.19,"abc":1960000.0,"fy":"2021","sd":"03/24/2022","cd":"2023-08-22","lat":17.49306,"lon":121.16778,"sm":125,"fm":null,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3288},{"i":4432,"cid":"23DE0111","pid":"P00742389LZ","t":"Construction of Flood Control Structure, Brgy. Talahib Pandayan, Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-11-21","lat":13.647164,"lon":121.140563,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talahib Pandayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3289},{"i":4433,"cid":"23OG0018","pid":"P00726026LZ","t":"Rehabilitation of Drainage System, Barangay Claro, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"ZALI CONSTRUCTION, INC.","c":8631549.0,"abc":8961988.88,"fy":"2023","sd":"02/15/2023","cd":"2024-06-24","lat":14.629343,"lon":121.062641,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Claro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3290},{"i":4434,"cid":"23OB0301","pid":"P00742238LZ","t":"Repair/Rehabilitation of Drainage in Provident Villages in Brgy. Tañong and Jesus Dela Peña, Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"BELL CONSTRUCTION","c":27933956.18,"abc":29397904.21,"fy":"2023","sd":"05/04/2023","cd":"2024-01-03","lat":14.629222,"lon":121.086763,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tañong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3291},{"i":4435,"cid":"23DN0074","pid":"P00737532LZ","t":"Construction of Breakwater, Barangay Ithan, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"JEBRON BUILDERS DEVELOPMENT CORPORATION","c":9899996.95,"abc":9900000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-02-26","lat":14.428799,"lon":121.213276,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ithan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3292},{"i":4436,"cid":"21DN0095","pid":"P00526134LZ","t":"Construction/Rehabilitation of Flood Control River (Downstream) Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":null,"deo":"Rizal 1st District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":19599999.07,"abc":19600000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-09-19","lat":14.49918,"lon":121.16793,"sm":null,"fm":null,"tm":null,"am":206,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":129},{"i":4437,"cid":"21BI0050","pid":"P00561682LZ","t":"Construction of Flood Control, Almaguer South, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Bambang","deo":"Nueva Vizcaya District Engineering Office","co":"M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":24750000.0,"abc":24750000.0,"fy":"2021","sd":"01/27/2022","cd":"2022-09-15","lat":16.3393,"lon":121.08726,"sm":142,"fm":null,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3293},{"i":4438,"cid":"21DO0067","pid":"P00561558LZ","t":"Construction of Grouted Riprap Slope Protection Wall along Bulubok Creek from Rural Bank of Montalban to Sitio Adia, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":29702033.61,"abc":30591000.0,"fy":"2021","sd":"12/20/2021","cd":"2022-08-18","lat":14.7259,"lon":121.1407,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Bulubok","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3294},{"i":4439,"cid":"24BI0060","pid":"P00843254LZ","t":"Construction of Flood Control and Drainage Structure along Magat River, Baretbet Section, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":89745000.0,"abc":89745000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-24","lat":16.584886,"lon":121.266488,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.26,"wp":[16.58305,121.26802],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[4519,4232,4329,4935,4256],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":352},{"i":4440,"cid":"23OG0077","pid":"P00727028LZ","t":"Rehabilitation of Buaya Creek, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":4851553.48,"abc":4899360.63,"fy":"2023","sd":"03/29/2023","cd":"2023-11-30","lat":14.62747,"lon":121.06268,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Buaya","wn":"Buaya Creek","wd":1.96,"wp":[14.61483,121.07543],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3295},{"i":4441,"cid":"24DD0199","pid":"P00846045LZ","t":"Construction of Covered Canal and Riprapping, Purok-1B, Sitio Bibingkahan, Barangay Sto. Toribo, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MEL JEAN CONSTRUCTION CORPORATION","c":4800175.78,"abc":4950000.0,"fy":"2024","sd":"05/31/2024","cd":"2024-10-01","lat":13.914317,"lon":121.214483,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":"Covered","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Toribo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3296},{"i":4442,"cid":"23DI0006","pid":"P00726225LZ","t":"Construction of River Protection Structure along San Cristobal River, Barangay Bañadero (Alcalde), Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"PASCAL CONSTRUCTION","c":42200389.0,"abc":43531600.0,"fy":"2023","sd":"02/08/2023","cd":"2023-09-17","lat":14.2333,"lon":121.16875,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.7,"wp":[14.22701,121.16946],"wst":"matched","br":"Bañadero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3297},{"i":4443,"cid":"23OB0085","pid":"P00725953LZ","t":"Rehabilitation of Drainage System at Housing Bliss and Vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":37224156.95,"abc":39199344.7,"fy":"2023","sd":"02/06/2023","cd":"2023-10-03","lat":14.556914,"lon":121.087423,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3298},{"i":4444,"cid":"21DO0043","pid":"P00561573LZ","t":"Rehabilitation of Slope Protection along Mamuyao River, Barangay Mamuyao, Tanay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Tanay","deo":"Rizal 2nd District Engineering Office","co":"JG NORA BUILDERS","c":1929947.64,"abc":1979910.41,"fy":"2021","sd":"09/05/2022","cd":"2022-12-14","lat":14.660765,"lon":121.358677,"sm":1541,"fm":null,"tm":1541,"am":1541,"md":0.0,"ls":"inside","ww":"Mamuyao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mamuyao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3299},{"i":4445,"cid":"22PB0004","pid":"P00620472LZ","t":"Construction of Barren River (Upstream) Flood Control Structure, Sta. 39 + 693 - Sta. 39 + 893 (R/S), Brgy. Ili, Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"BAHRAMLEY CONSTRUCTION","c":15680000.0,"abc":15678924.68,"fy":"2022","sd":"03/01/2022","cd":"2022-12-22","lat":17.823889,"lon":121.267778,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.02,"wp":[17.82388,121.26755],"wst":"matched","br":"Ili","len":200.0,"ph":null,"dup":[4451],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 38,608,490.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1023},{"i":4446,"cid":"24ED0080","pid":"P00845838LZ","t":"Construction of Coastal Protection Works, Brgy. Wawa Section, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ARCONIC INC.","c":67549998.51,"abc":67550000.0,"fy":"2024","sd":"02/22/2024","cd":"2025-02-24","lat":13.404722,"lon":121.141389,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Wawa Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3300},{"i":4447,"cid":"23EB0039","pid":"P00726597LZ","t":"Construction of Tanyag Flood Control Structure along Lumintao River, Sitio Alipundo, Sta. 0 + 000 - Sta. 0 + 604, Calintaan, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"CALINTAAN (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. / MICKU ROBIN CONSTRUCTION","c":49212877.23,"abc":49215000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-22","lat":12.61877,"lon":121.06294,"sm":307,"fm":307,"tm":307,"am":307,"md":0.0,"ls":"inside","ww":"Lumintao","wn":"Lumintao River","wd":0.04,"wp":[12.61857,121.06322],"wst":"matched","br":null,"len":604.0,"ph":null,"dup":[],"run":[3065,2969],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23EB0036 to 23EB0039) cover the same site, together worth PHP 242,134,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":485},{"i":4448,"cid":"22DO0018","pid":"P00620215LZ","t":"Construction of Flood Control Structure Along Teresa River Brgy San Gabriel and Brgy Dalig, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"HONY TRADING & CONSTRUCTION / JOAN AND JOHN CONSTRUCTION AND TRADING","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/07/2022","cd":"2023-09-06","lat":14.555556,"lon":121.215556,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.01,"wp":[14.55562,121.21561],"wst":"matched","br":"San Gabriel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3301},{"i":4449,"cid":"23PG0047","pid":"P00742288LZ","t":"Construction of River Wall, Mongkilong River, Kiangan, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"KIANGAN (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"MSMV CONSTRUCTION AND SUPPLY","c":4865109.77,"abc":4945128.34,"fy":"2023","sd":"08/09/2023","cd":"2024-11-10","lat":16.77016,"lon":121.08755,"sm":708,"fm":708,"tm":708,"am":708,"md":0.0,"ls":"inside","ww":"Mongkilong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3302},{"i":4450,"cid":"23DD0117","pid":"P00742401LZ","t":"Construction of Box Culvert in Brgy. Palahanan I, San Juan, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"JSAM CONSTRUCTION","c":4801978.98,"abc":4950000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-10-04","lat":13.83516,"lon":121.35952,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palahanan I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3303},{"i":4451,"cid":"22PB0005","pid":"P00620988LZ","t":"Construction of Barren River (Upstream) Flood Control Structure, Sta. 39 + 693 - Sta. 39 + 993 (L/S), Brgy. Ili, Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"PRIME MASTER CONST. AND DEV'T. CORP.","c":22928490.31,"abc":23519997.48,"fy":"2022","sd":"02/09/2022","cd":"2022-11-02","lat":17.823889,"lon":121.267778,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.02,"wp":[17.82388,121.26755],"wst":"matched","br":"Ili","len":300.0,"ph":null,"dup":[4445],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 38,608,490.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":998},{"i":4452,"cid":"22DE0034","pid":"P00620864LZ","t":"Construction of Flood Control Structure along Lobo River, Olo-Olo, Lobo, Batangas (Section 1) Package A","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":78469940.0,"abc":78469940.0,"fy":"2022","sd":"02/15/2022","cd":"2023-04-02","lat":13.649755,"lon":121.215876,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":"Lobo","wn":"Lobo River","wd":0.1,"wp":[13.65038,121.21517],"wst":"matched","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3304},{"i":4453,"cid":"24OB0194","pid":"P00821077LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 8), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":94559906.54,"abc":96499547.45,"fy":"2024","sd":"02/13/2024","cd":"2024-10-09","lat":14.490191,"lon":121.063049,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 8","dup":[],"run":[4090,4091,4092,4682,4669,4643,4504],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":353},{"i":4454,"cid":"21DO0055","pid":"P00561804LZ","t":"Construction of Riprap in Bautista Creek Banlik Sub Urban Village, San Jose, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":5940000.0,"abc":35640000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-15","lat":14.7522,"lon":121.1416,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Bautista","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3305},{"i":4455,"cid":"23DD0110","pid":"P00727156LZ","t":"Construction of Revetment along Lawaye River (Palahanan Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"FIVE TRAVELLERS CONSTRUCTION INC.","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-10-02","lat":13.8295,"lon":121.36224,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.02,"wp":[13.82934,121.3622],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3306},{"i":4456,"cid":"22BC0120","pid":"P00621528LZ","t":"Construction of Cabicungan Flood Control Structure along Cabicungan River, San Antonio-Capannikian-Tabbugan, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"J.B. ALCANTARA BUILDERS","c":14700000.0,"abc":14700000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-04","lat":18.577617,"lon":121.087648,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":0.02,"wp":[18.57774,121.08782],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3307},{"i":4457,"cid":"23DE0054","pid":"P00742390LZ","t":"Construction of River Slope Protection (Phase 2), Sitio Recto A, Barangay Malabrigo, Lobo, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP.","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-06-21","lat":13.6048,"lon":121.2678,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malabrigo","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3308},{"i":4458,"cid":"23DO0015","pid":"P00725832LZ","t":"Construction of Flood Control Structure along Teresa River, Sitio Korokan, Barangay May-iba, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-11-16","lat":14.572953,"lon":121.216039,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.0,"wp":[14.57291,121.21605],"wst":"matched","br":"May-iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3309},{"i":4459,"cid":"24ED0071","pid":"P00823584LZ","t":"Construction of Seawall, Block 5 to Block 4, Barangay Pachoca, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MARCING CONSTRUCTION SERVICES","c":24124947.7,"abc":24125000.0,"fy":"2024","sd":"05/20/2024","cd":"2024-12-16","lat":13.414722,"lon":121.168889,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pachoca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3310},{"i":4460,"cid":"23DE0085","pid":"P00726750LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 5), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-11-06","lat":13.748049,"lon":121.063179,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.11,"wp":[13.74806,121.0622],"wst":"matched","br":null,"len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3311},{"i":4461,"cid":"24PK0014","pid":"P00821563LZ","t":"Construction of Tabiong Flood Control along Chico River, Sta. 188+950 - Sta. 189+050 (LS), Poblacion, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"MA BUYAGAN CONSTRUCTION SERVICES","c":8815139.84,"abc":8820000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-08-22","lat":17.25938,"lon":121.14218,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.13,"wp":[17.25833,121.14266],"wst":"matched","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3312},{"i":4462,"cid":"21DO0073","pid":"P00561548LZ","t":"Construction for Slope at Baras River, Barangay San Juan, Baras, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Baras","deo":"Rizal 2nd District Engineering Office","co":"L. EUSEBIO ACE DEVELOPMENT CORPORATION","c":7642498.81,"abc":7920000.0,"fy":"2021","sd":"12/16/2021","cd":"2022-10-17","lat":14.524722,"lon":121.268056,"sm":160,"fm":null,"tm":160,"am":160,"md":0.0,"ls":"inside","ww":"Baras","wn":"Baras River","wd":0.01,"wp":[14.52477,121.26795],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3313},{"i":4463,"cid":"22DN0071","pid":"P00620637LZ","t":"Construction of Slope Protection Structure, Bilibiran Creek (Downstream), Binangonan, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":47039965.76,"abc":47040000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-09-20","lat":14.50047,"lon":121.16896,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"Bilibiran","wn":"Bilibiran River","wd":0.01,"wp":[14.50049,121.16892],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3314},{"i":4464,"cid":"22EI0075","pid":"P00632940LZ","t":"Construction of Slope Protection of NRJ, Barangay Lisap to Siange, Bongabong, Oriental Mindoro","w":"Construction of Slope Protection Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ORIENT STAR CONSTRUCTION, INC. (FORMERLY: ORIENT S","c":6666333.87,"abc":6929851.07,"fy":"2022","sd":"02/21/2022","cd":"2022-12-07","lat":12.691389,"lon":121.365556,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lisap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3315},{"i":4465,"cid":"23P00020","pid":"P00740313LZ","t":"Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 37+995 - Sta. 39+300 (R/S), Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"JOMARCANN GENERAL CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":115800000.0,"abc":115793907.8,"fy":"2023","sd":"04/12/2023","cd":"2024-02-29","lat":17.81972,"lon":121.26833,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.03,"wp":[17.81967,121.2681],"wst":"matched","br":null,"len":1305.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3316},{"i":4466,"cid":"22DO0038","pid":"P00620651LZ","t":"Construction of Flood Control and River Bank Protection Structure Along Teresa River, Brgy. May-Iba, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-10-29","lat":14.572778,"lon":121.216111,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.02,"wp":[14.57292,121.21608],"wst":"matched","br":"May-Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3317},{"i":4467,"cid":"22BI0056","pid":"P00621419LZ","t":"Construction of Sta. Fe River Control Structure, Almaguer South Section, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-12-18","lat":16.354731,"lon":121.088065,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":8.02,"wp":[16.29706,121.04263],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3318},{"i":4468,"cid":"21DN0097","pid":"P00526133LZ","t":"Construction of Flood Control Structure at Bilibiran, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Binangonan","deo":"Rizal 1st District Engineering Office","co":"G. ANORE CONSTRUCTION","c":19599997.48,"abc":19600000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-08-20","lat":14.50047,"lon":121.16897,"sm":206,"fm":null,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3319},{"i":4469,"cid":"21DD0315","pid":"P00561181LZ","t":"Construction of Slope Protection along Barangay Catandala, Ibaan, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"Ibaan","deo":"Batangas 4th District Engineering Office","co":"JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":32320400.0,"abc":33320000.0,"fy":"2021","sd":"11/11/2021","cd":"2022-07-01","lat":13.79305,"lon":121.1425,"sm":628,"fm":null,"tm":628,"am":628,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catandala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3320},{"i":4470,"cid":"22DE0045","pid":"P00620213LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 4), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-12-07","lat":13.74632,"lon":121.06321,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.11,"wp":[13.74625,121.0622],"wst":"matched","br":null,"len":null,"ph":"Section 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3321},{"i":4471,"cid":"23PL0021","pid":"P00726657LZ","t":"Construction (Continuation) of Bantay Flood Control, Bantay, Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"JTM CONSTRUCTION / GARVIS CONSTRUCTION CORPORATION","c":48970460.61,"abc":48977851.32,"fy":"2023","sd":"02/20/2023","cd":"2023-07-28","lat":17.40077,"lon":121.37028,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3322},{"i":4472,"cid":"22PB0010","pid":"P00620136LZ","t":"Construction of Barren River (Downstream) Flood Control Structure, Sta. 39+033 - Sta. 39+693 (L/S), Brgy. Malama, Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":51762600.0,"abc":51761907.66,"fy":"2022","sd":"04/04/2022","cd":"2023-05-30","lat":17.818333,"lon":121.268611,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.02,"wp":[17.81829,121.26843],"wst":"matched","br":"Malama","len":660.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3323},{"i":4473,"cid":"22DD0263","pid":"P00640547LZ","t":"Rehabilitation of Box Culvert and Related Structures at Barangay Balagtasin, San Jose, Batangas","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":3841200.0,"abc":3960000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-02","lat":13.90624,"lon":121.08849,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balagtasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3324},{"i":4474,"cid":"23E00041","pid":"P00736029LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio 1 & 2, Barangay San Andres Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":217120601.7,"abc":217125000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-12-10","lat":13.1628,"lon":121.1698,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.92,"wp":[13.15842,121.17705],"wst":"matched","br":"San Andres Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3325},{"i":4475,"cid":"22PK0013","pid":"P00621014LZ","t":"Construction (Completion) of Luplupa Flood Control Structure along Chico River Sta. 189+100 - Sta. 189+250 (R/S), Luplupa,Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"FEREST DWAYNE CONSTRUCTION","c":8598099.86,"abc":9800000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-20","lat":17.25861,"lon":121.1425,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.25832,121.14263],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3326},{"i":4476,"cid":"23E00043","pid":"P00736031LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Ginhawa Section, Barangay Tagumpay, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) / FGO CONSTRUCTION","c":221948493.4,"abc":221950000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.1697,"lon":121.1701,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.43,"wp":[13.1594,121.17808],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3327},{"i":4477,"cid":"22OC0042","pid":"P00632712LZ","t":"Rehabilitation of Drainage Along A. Mabini St. and its vicinity, Barangay West Rembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":13860000.0,"abc":13720000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-07-20","lat":14.56029,"lon":121.063232,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"West Rembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":967},{"i":4478,"cid":"23ED0032","pid":"P00727189LZ","t":"Construction of Flood Control in So Lapog, Sto Domingo, Socorro, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"SOCORRO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":30791170.25,"abc":38600000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-10-01","lat":13.12306,"lon":121.3708,"sm":1472,"fm":1472,"tm":1472,"am":1472,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3328},{"i":4479,"cid":"23DD0240","pid":"P00742412LZ","t":"Rehabilitation of Drainage System, Brgy. Balagtasin I, San Jose, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":5761800.0,"abc":5940000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-09-16","lat":13.89031,"lon":121.08861,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balagtasin I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3329},{"i":4480,"cid":"24DO0036","pid":"P00820963LZ","t":"Construction of Flood Control Structure along Teresa River, Barangay Bagumbayan to Barangay Prinza, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":48444340.0,"abc":48444340.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-18","lat":14.5483,"lon":121.21641,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.0,"wp":[14.54832,121.21643],"wst":"matched","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3330},{"i":4481,"cid":"23PB0009","pid":"P00726398LZ","t":"Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 938 (L/S), Barangay Malama, Conner, Apayao","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"02/12/2023","cd":"2023-12-14","lat":17.818642,"lon":121.268639,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.03,"wp":[17.81858,121.26836],"wst":"matched","br":"Malama","len":1200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3331},{"i":4482,"cid":"21DN0067","pid":"P00526131LZ","t":"Construction of Flood Control Structures of Sucaben River, Antipolo City (Phase 3)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"City of Antipolo","deo":"Rizal 1st District Engineering Office","co":"LTDL BUILDERS","c":13966470.0,"abc":14700000.0,"fy":"2021","sd":"02/28/2022","cd":"2022-07-27","lat":14.60368,"lon":121.14289,"sm":365,"fm":null,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Sucaben","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3332},{"i":4483,"cid":"23E00042","pid":"P00736030LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio 3 & 4, Barangay San Andres Section, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":217121051.4,"abc":217124999.8,"fy":"2023","sd":"02/11/2023","cd":"2024-02-05","lat":13.1643,"lon":121.1703,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.98,"wp":[13.15863,121.17723],"wst":"matched","br":"San Andres Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3333},{"i":4484,"cid":"22CN0188","pid":"P00640456LZ","t":"Construction of Flood Control Structure, Brgy. Matawe, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION / CHRISTIAN IAN CONSTRUCTION CORPORATION","c":118800000.0,"abc":118800000.0,"fy":"2022","sd":"07/25/2022","cd":"2023-05-18","lat":15.326385,"lon":121.37143,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matawe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3334},{"i":4485,"cid":"24OB0085","pid":"P00824584LZ","t":"Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Dela Paz, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)","c":11557707.21,"abc":11759946.87,"fy":"2024","sd":"10/04/2024","cd":"2025-02-15","lat":14.620213,"lon":121.088639,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3335},{"i":4486,"cid":"23DO0028","pid":"P00737533LZ","t":"Construction of Flood Control System (Slope Protection), Barangay Prinza, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GKB BUILDERS","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-04-15","lat":14.543525,"lon":121.216663,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Prinza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3336},{"i":4487,"cid":"23BC0080","pid":"P00727267LZ","t":"Construction of Cabicungan Flood Control Structure along Cabicungan River,Centro 6-Dibalio, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-04-06","lat":18.61132,"lon":121.08877,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":0.27,"wp":[18.6111,121.0913],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3337},{"i":4488,"cid":"23PK0033","pid":"P00726102LZ","t":"Construction of Lower Uma Flood Control and Drainage, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"SONBLESSED CONSTRUCTION AND SUPPLY","c":7834904.25,"abc":7840000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-04-15","lat":17.35699,"lon":121.14311,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3338},{"i":4489,"cid":"22DD0121","pid":"P00637791LZ","t":"Construction of Box Culvert in Brgy. Castillo, Padre Garcia, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"PADRE GARCIA (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"DARCY & ANNA BUILDERS & TRADING","c":4801460.0,"abc":4950000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-02","lat":13.87795,"lon":121.26957,"sm":1052,"fm":1052,"tm":1052,"am":1052,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Castillo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3339},{"i":4490,"cid":"23D00077","pid":"P00725839LZ","t":"Construction of Flood Control Structure along Bilibiran Creek, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":106149946.5,"abc":106150000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-02-04","lat":14.500944,"lon":121.170425,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"Bilibiran","wn":"Bilibiran River","wd":0.01,"wp":[14.50097,121.17047],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3340},{"i":4491,"cid":"22DE0044","pid":"P00620212LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 3), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-12-07","lat":13.74919,"lon":121.06331,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.12,"wp":[13.7492,121.06221],"wst":"matched","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3341},{"i":4492,"cid":"23DN0075","pid":"P00737530LZ","t":"Construction of Breakwater at Barangay Kaytome, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FLAG CONSTRUCTION CORPORATION(FOR. FLAG CONSTRUCTI","c":9899988.55,"abc":9900000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-07-17","lat":14.350558,"lon":121.21678,"sm":206,"fm":206,"tm":206,"am":206,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaytome","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3342},{"i":4493,"cid":"24BI0020","pid":"P00821192LZ","t":"Construction of Flood Control Structure along Santa Fe River, Barangay Aliaga, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-03-27","lat":16.37575,"lon":121.08889,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Santa Fe","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Aliaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3343},{"i":4494,"cid":"24PM0016","pid":"P00821545LZ","t":"Construction of Binabagan Flood Control, Bunot, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"JTM CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-10-02","lat":17.239,"lon":121.37236,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3344},{"i":4495,"cid":"23DD0038","pid":"P00737498LZ","t":"Construction of Box Culvert, Barangay Tambo, Lipa City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"ABLB CONSTRUCTION SERVICES","c":4800269.23,"abc":4950000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-06-07","lat":13.94175,"lon":121.14321,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3345},{"i":4496,"cid":"23BI0028","pid":"P00742127LZ","t":"Construction of Flood Control and Drainage Structures (FCDS) along Magat River, Kinacao Section, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":69300000.0,"abc":69300000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-10-15","lat":16.586689,"lon":121.269861,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.06,"wp":[16.58668,121.26926],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3346},{"i":4497,"cid":"23E00046","pid":"P00736034LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Damayan Section, Barangay Inarawan, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217122876.4,"abc":217124995.5,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.1777,"lon":121.1716,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.33,"wp":[13.18293,121.18264],"wst":"matched","br":"Inarawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3347},{"i":4498,"cid":"24OB0182","pid":"P00821065LZ","t":"Construction of Slope Protection along Taguig River (Phase 1), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":94568185.19,"abc":96499469.9,"fy":"2024","sd":"02/13/2024","cd":"2024-09-23","lat":14.4907,"lon":121.0634,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":3.32,"wp":[14.5123,121.08476],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.32,"text":"The title names Taguig, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":325},{"i":4499,"cid":"23PM0018","pid":"P00725656LZ","t":"Construction of Duli Flood Control, Sta. 123 + 580 - Sta. 123 + 680 (R.S.), Sta. 123 + 800 - Sta. 124 + 350 (R.S.), Bunot, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"A.I.P. CONSTRUCTION","c":62725000.0,"abc":62725000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-08-15","lat":17.231,"lon":121.37384,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":650.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3348},{"i":4500,"cid":"24PM0014","pid":"P00821120LZ","t":"Construction of Duli Flood Control, Bunot, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / FLEURDELIS CONSTRUCTION AND SUPPLY","c":52744005.0,"abc":52744005.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-05","lat":17.2423,"lon":121.37423,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3349},{"i":4501,"cid":"23OB0109","pid":"P00737363LZ","t":"Construction of San Luis Pumping Station, Barangay Batis, San Juan City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"SAN JUAN CITY","mu":"CITY OF SAN JUAN (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING / NEW EASTPOINT BUILDERS CORP.","c":65573723.02,"abc":67549650.43,"fy":"2023","sd":"02/13/2023","cd":"2024-04-21","lat":14.588464,"lon":121.089098,"sm":417,"fm":417,"tm":417,"am":412,"md":3.53,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.68,"value":3.53,"text":"The pin is 3.5 km outside City of San Juan, NCR, Second District, the nearest municipality the record claims. It falls in City of Pasig, NCR, Second District.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":259},{"i":4502,"cid":"22DE0035","pid":"P00631282LZ","t":"Construction of Flood Control Project at Brgy. Olo-olo-Upstream, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-08-31","lat":13.651811,"lon":121.217545,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Olo-olo-Upstream","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3350},{"i":4503,"cid":"22DN0021","pid":"P00620623LZ","t":"Construction of Flood Control Structure (Upper) Phase 2, Brgy. Dela Paz and Brgy. San Isidro, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BELL CONSTRUCTION","c":27439523.75,"abc":27440000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-13","lat":14.59172,"lon":121.17195,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dela Paz","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3351},{"i":4504,"cid":"24OB0193","pid":"P00821076LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 7), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC.","c":94569774.62,"abc":96499770.03,"fy":"2024","sd":"02/13/2024","cd":"2024-10-07","lat":14.49162,"lon":121.063416,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[4090,4091,4092,4682,4669,4643,4453],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":354},{"i":4505,"cid":"24DO0011","pid":"P00820312LZ","t":"Construction of Flood Mitigation Structure along Baras River, Barangay San Jose, Baras, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BARAS (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":91675000.0,"abc":91675000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-19","lat":14.5278,"lon":121.27043,"sm":160,"fm":160,"tm":160,"am":160,"md":0.0,"ls":"inside","ww":"Baras","wn":"Baras River","wd":0.0,"wp":[14.5278,121.27043],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3352},{"i":4506,"cid":"21DN0111","pid":"P00561396LZ","t":"Construction/Rehabilitation of Flood Control Structure, Bilibiran Creek (Upstream), Binangonan, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Binangonan","deo":"Rizal 1st District Engineering Office","co":"J.H.R. ENTERPRISES","c":19799998.38,"abc":19800000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-08-20","lat":14.50108,"lon":121.17221,"sm":206,"fm":null,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"Bilibiran","wn":"Bilibiran River","wd":0.0,"wp":[14.50107,121.17222],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3353},{"i":4507,"cid":"23DD0320","pid":"P00742410LZ","t":"Construction of Slope Protection with Flood Mitigation Structure along Pinagtung-Ulan Bridge, San Jose, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"830 BUILDERS & DEVELOPERS CORP.","c":9603000.0,"abc":9900000.0,"fy":"2023","sd":"08/03/2023","cd":"2023-11-09","lat":13.92555,"lon":121.08934,"sm":1299,"fm":1299,"tm":1299,"am":799,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3354},{"i":4508,"cid":"22EI0031","pid":"P00620676LZ","t":"Construction of Flood Mitigation Structure, Brgy. Hagan, Sta. 0+000 - Sta. 0+112, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"KING'S BUILDERS & DEVELOPMENT CORPORATION","c":13984346.37,"abc":14004987.82,"fy":"2022","sd":"06/03/2022","cd":"2022-12-06","lat":12.700556,"lon":121.375,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hagan","len":112.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3355},{"i":4509,"cid":"23DN0090","pid":"P00742445LZ","t":"Construction/ Maintenance of Flood Mitigation Structures, Sucaben River, Brgy. Muntindilaw, Brgy. Dela Paz and Brgy. Mambugan, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"STREAMLINE BUILDERS CORPORATION","c":19800000.0,"abc":19800000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-12-05","lat":14.605805,"lon":121.143234,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Sucaben","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Muntindilaw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3356},{"i":4510,"cid":"22OC0027","pid":"P00620378LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along 27th Avenue and its Vicinity, Brgy. East Rembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"ALEXA TRADING & CONSTRUCTION","c":10240935.96,"abc":10780000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-01","lat":14.550877,"lon":121.063441,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"East Rembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3357},{"i":4511,"cid":"22DI0057","pid":"P00632900LZ","t":"Rehabilitation of Drainage in Barangay Bambang, Los Ban~os, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"A.I.A. CONSTRUCTION","c":5814445.94,"abc":5940000.0,"fy":"2022","sd":"03/09/2022","cd":"2022-07-09","lat":14.17782,"lon":121.21797,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bambang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3358},{"i":4512,"cid":"23DI0051","pid":"P00725792LZ","t":"Construction of River Protection Structure along Maitim Waterways, Brgy. Paciano Rizal, Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":48233455.0,"abc":48250000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-10-12","lat":14.1489,"lon":121.2714,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paciano Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3359},{"i":4513,"cid":"22DM0118","pid":"P00621472LZ","t":"Construction of Slope Protection at Brgy. Castillo, Pitogo, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PITOGO (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"M.C. LAYGO BUILDERS","c":14700000.0,"abc":14699799.99,"fy":"2022","sd":"04/05/2022","cd":"2022-10-31","lat":13.780781,"lon":121.089346,"sm":1148,"fm":1148,"tm":1148,"am":180,"md":100.96,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Castillo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":100.96,"text":"The pin is 101.0 km outside Pitogo, Quezon, the nearest municipality the record claims. It falls in Batangas City, Batangas.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":231},{"i":4514,"cid":"22PC0014","pid":"P00620802LZ","t":"Construction of Apayao-Abulug River Basin Flood Control Structure, Swan Section, Sta. 37 + 121 - Sta. 37 + 682 (R/S), Pudtol, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"PUDTOL (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS / ISNAG BUILDERS & DEV'T. CORPORATION","c":79576285.45,"abc":82025000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-07-31","lat":18.20659,"lon":121.37653,"sm":1178,"fm":1178,"tm":1178,"am":1178,"md":0.0,"ls":"inside","ww":"Apayao-Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":561.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3360},{"i":4515,"cid":"24DN0027","pid":"P00820932LZ","t":"Construction of Breakwater at Barangay Sapang, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"MAK-JAMS CONSTRUCTION","c":9799977.16,"abc":9800000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-05-29","lat":14.339019,"lon":121.217981,"sm":206,"fm":206,"tm":206,"am":206,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3361},{"i":4516,"cid":"23DD0084","pid":"P00742398LZ","t":"Construction of Slope Protection and Box Culvert in Brgy. Castillo, Padre Garcia, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"PADRE GARCIA (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"KENSAL RISE CONSTRUCTION","c":5761800.0,"abc":5940000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-06-15","lat":13.87242,"lon":121.27148,"sm":1052,"fm":1052,"tm":1052,"am":1052,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Castillo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3362},{"i":4517,"cid":"23E00044","pid":"P00736032LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Masaya Section, Barangay Tagumpay, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MACROPRIME BUILDERS CORPORATION (FORMERLY: MORANTE BUILDERS & SUPPLY) / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":212299613.5,"abc":212300000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.1821,"lon":121.1724,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.11,"wp":[13.18293,121.18264],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3363},{"i":4518,"cid":"23BC0021","pid":"P00726434LZ","t":"Construction of Cabicungan Flood Control Structure along Cabicungan River, Capanikkian-Nagsabaran, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":48250000.0,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-08-18","lat":18.5711,"lon":121.08944,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":0.04,"wp":[18.57135,121.08922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3364},{"i":4519,"cid":"24BI0055","pid":"P00825048LZ","t":"Rehabilitation of Flood Control Structure along Magat River, Sto. Vista Alegra Section, Package 1, Bayombong, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-07-16","lat":16.47358,"lon":121.143566,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.02,"wp":[16.47342,121.14356],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[4232,4329,4935,4256,4439],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":214},{"i":4520,"cid":"22OF0058","pid":"P00631051LZ","t":"Rehabilitation of Flood Control Structure, Barangay Sta. Monica, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":14259000.0,"abc":14700000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-11-06","lat":14.71114,"lon":121.063513,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3365},{"i":4521,"cid":"24EI0073","pid":"P00825131LZ","t":"Construction of Bongabong River Control, Brgy. Morente Section, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":96496493.95,"abc":96500000.0,"fy":"2024","sd":"03/11/2024","cd":"2025-02-10","lat":12.688632,"lon":121.377455,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.0,"wp":[12.68863,121.37745],"wst":"matched","br":"Morente Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3366},{"i":4522,"cid":"22DN0112","pid":"P00637800LZ","t":"Construction/Continuation of Breakwater Structure, Brgy. Janosa, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"MAK-JAMS CONSTRUCTION","c":9899971.09,"abc":9900000.0,"fy":"2022","sd":"06/06/2022","cd":"2022-10-03","lat":14.355177,"lon":121.218414,"sm":206,"fm":206,"tm":206,"am":206,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Janosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3367},{"i":4523,"cid":"23DO0050","pid":"P00737536LZ","t":"Rehabilitation of Drainage System at Marang Road, Barangay Maly, San Mateo, Rizal","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"SAN MATEO (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"22 PRIME CONSTRUCTION AND REALTY DEVELOPMENT INC.","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-09-23","lat":14.708062,"lon":121.143667,"sm":1329,"fm":1329,"tm":1329,"am":1329,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maly","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3368},{"i":4524,"cid":"22PC0056","pid":"P00620810LZ","t":"Construction of Pamplona River Basin Flood Control Structure, Marag Section, Sta 27+562-Sta 27+762 (LS), Sta. 27+960-Sta. 28+460 (LS), Luna, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"LUNA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":79564241.95,"abc":82025000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-10-09","lat":18.34319,"lon":121.27193,"sm":830,"fm":830,"tm":830,"am":830,"md":0.0,"ls":"inside","ww":"Pamplona","wn":"Pamplona River","wd":11.44,"wp":[18.44025,121.30924],"wst":"matched","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3369},{"i":4525,"cid":"22DN0140","pid":"P00639496LZ","t":"Construction of Breakwater structure, Barangay Janosa, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"DUKHEA CONSTRUCTION","c":9799983.23,"abc":9800000.0,"fy":"2022","sd":"07/27/2022","cd":"2022-10-24","lat":14.355942,"lon":121.218642,"sm":206,"fm":206,"tm":206,"am":206,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Janosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3370},{"i":4526,"cid":"21DI0072","pid":"P00526091LZ","t":"Construction of Revetment along San Juan River, Barangay San Juan, Calamba City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"City of Calamba","deo":"Laguna 2nd District Engineering Office","co":"M.T. MALIUANAG CONSTRUCTION SERVICES","c":28372642.6,"abc":29400000.0,"fy":"2021","sd":"03/30/2022","cd":"2022-07-20","lat":14.217378,"lon":121.172686,"sm":376,"fm":null,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.02,"wp":[14.21755,121.1727],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3371},{"i":4527,"cid":"21OC0154","pid":"P00561155LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along 28th Avenue and its Vicinity, Brgy. East Rembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"JP ESPIRITU CONSTRUCTION SERVICES AND SUPPLY","c":13963308.5,"abc":14700000.0,"fy":"2021","sd":"05/24/2022","cd":"2022-09-20","lat":14.550433,"lon":121.063533,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"East Rembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3372},{"i":4528,"cid":"23EI0028","pid":"P00736624LZ","t":"Construction of Seawall at Barangay Balatasan, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":47701895.21,"abc":48999974.87,"fy":"2023","sd":"02/10/2023","cd":"2023-11-16","lat":12.296904,"lon":121.382001,"sm":249,"fm":249,"tm":249,"am":249,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balatasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3373},{"i":4529,"cid":"23OB0077","pid":"P00725962LZ","t":"Rehabilitation of Drainage System along Interior Roads Suarez Ville, Barangay Plnagbuhatan and vicinity, Paslg City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":27947309.47,"abc":29399573.02,"fy":"2023","sd":"02/06/2023","cd":"2023-10-09","lat":14.56058,"lon":121.0896,"sm":412,"fm":412,"tm":null,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Plnagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3374},{"i":4530,"cid":"22P00086","pid":"P00621502LZ","t":"Construction of Flood Control Structure along Nayon River, Sta. 13+904 - Sta. 13+960 and Sta. 13+970 - Sta. 14+114, (Bimpal side) Lamut, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"LAMUT (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"LBJ CONSTRUCTION","c":12494941.19,"abc":12544591.72,"fy":"2022","sd":"08/09/2022","cd":"2023-04-22","lat":16.72,"lon":121.1728,"sm":744,"fm":744,"tm":744,"am":744,"md":0.0,"ls":"inside","ww":"Nayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":563},{"i":4531,"cid":"24BI0041","pid":"P00823341LZ","t":"Construction of Bakir Flood Control Structure along Lamut River, Barangay Bakir, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-07-22","lat":16.444,"lon":121.218814,"sm":104,"fm":104,"tm":104,"am":197,"md":11.09,"ls":"outside","ww":"Lamut","wn":"Lamut River","wd":21.72,"wp":[16.63941,121.20029],"wst":"matched","br":"Bakir","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":78,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.09,"text":"The pin is 11.1 km outside Bagabag, Nueva Vizcaya, the nearest municipality the record claims. It falls in Bayombong, Nueva Vizcaya.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.8,"value":21.72,"text":"The title names Lamut, which OpenStreetMap maps through the stated municipality, but the pin is 21.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":23},{"i":4532,"cid":"24CD0173","pid":"P00844755LZ","t":"Construction of Slope Protection Structure, Barangay Citrus, San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":48990160.74,"abc":48999607.56,"fy":"2024","sd":"04/30/2024","cd":"2025-01-20","lat":14.852634,"lon":121.063627,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Citrus","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3375},{"i":4533,"cid":"23PC0066","pid":"P00742287LZ","t":"Construction of Calabigan Flood Control Structure, Barangay Calabigan, Luna, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"LUNA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":14243240.81,"abc":14700000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-02-27","lat":18.34743,"lon":121.27225,"sm":830,"fm":830,"tm":830,"am":830,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calabigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3376},{"i":4534,"cid":"22PK0037","pid":"P00621017LZ","t":"Construction of Danglis Flood Control Structure along Chico River Sta. 188+800 - Sta. 188+950 (R.S.), Poblacion, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"YUNAKIM CONSTRUCTION","c":9788631.81,"abc":9800000.0,"fy":"2022","sd":"04/10/2022","cd":"2022-10-25","lat":17.25911,"lon":121.1437,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.05,"wp":[17.2587,121.14376],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3377},{"i":4535,"cid":"23OB0386","pid":"P00726825LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 7), Taguig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":82507105.55,"abc":86849594.79,"fy":"2023","sd":"03/22/2023","cd":"2023-10-20","lat":14.526907,"lon":121.089698,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[4657,4617],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0384 to 23OB0386) cover the same site, together worth PHP 247,442,958.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":355},{"i":4536,"cid":"23PC0029","pid":"P00726399LZ","t":"Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"PUDTOL (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"TAGEL CORPORATION","c":96481880.32,"abc":96500000.0,"fy":"2023","sd":"05/05/2023","cd":"2024-04-03","lat":18.22593,"lon":121.38433,"sm":1178,"fm":1178,"tm":1178,"am":1178,"md":0.0,"ls":"inside","ww":"Apayao-Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":555.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3378},{"i":4537,"cid":"22BI0028","pid":"P00621070LZ","t":"Construction of Magat River Control, Paitan Section (Sta. 0+000 - Sta. 0+580), Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"ERIC VAN P. SESBRENO CONSTRUCTION / V.B. GINES CONSTRUCTION","c":40826800.0,"abc":40826800.0,"fy":"2022","sd":"02/20/2022","cd":"2022-12-16","lat":16.470243,"lon":121.144265,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.34,"wp":[16.47325,121.14478],"wst":"matched","br":null,"len":580.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3379},{"i":4538,"cid":"24OB0097","pid":"P00824596LZ","t":"Rehabilitation of Drainage System along Westbank Road, Manggahan Floodway, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":9601233.69,"abc":9799798.13,"fy":"2024","sd":"04/08/2024","cd":"2024-11-06","lat":14.597011,"lon":121.08978,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.1,"wp":[14.59731,121.09068],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3380},{"i":4539,"cid":"22DD0157","pid":"P00640549LZ","t":"Rehabilitation of Drainage System, Barangay Anilao, Lipa City Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"ABLB CONSTRUCTION SERVICES","c":4801470.13,"abc":4950000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-07-07","lat":13.90978,"lon":121.17287,"sm":799,"fm":799,"tm":null,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anilao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3381},{"i":4540,"cid":"22DN0131","pid":"P00639499LZ","t":"Improvement of Breakwater, Purok 2 - Purok 3, Barangay Janosa, Binangonan, Rizal","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FLAG CONSTRUCTION CORPORATION(FOR. FLAG CONSTRUCTI","c":9799973.61,"abc":9800000.0,"fy":"2022","sd":"07/04/2022","cd":"2022-12-22","lat":14.355961,"lon":121.218938,"sm":206,"fm":206,"tm":206,"am":206,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Janosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3382},{"i":4541,"cid":"23OG0086","pid":"P00727030LZ","t":"Rehabilitation of Duyan-duyan Creek, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":14653311.8,"abc":14699422.01,"fy":"2023","sd":"03/29/2023","cd":"2024-03-07","lat":14.632674,"lon":121.063686,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Duyan-duyan","wn":"Duyan-duyan Creek","wd":0.0,"wp":[14.63268,121.06368],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3383},{"i":4542,"cid":"22OB0311","pid":"P00621524LZ","t":"Bank Improvement of Pateros River, Pateros, Metro Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":49000000.0,"abc":48999295.32,"fy":"2022","sd":"03/24/2022","cd":"2022-09-19","lat":14.535317,"lon":121.063826,"sm":1521,"fm":1521,"tm":1112,"am":398,"md":0.01,"ls":"boundary","ww":"Pateros","wn":"Pateros River","wd":0.01,"wp":[14.53526,121.06382],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3384},{"i":4543,"cid":"22BI0036","pid":"P00621067LZ","t":"Construction of Homestead Flood Control Structure along Sta. Fe River, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"BRG CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-10-09","lat":16.39131,"lon":121.144265,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":15.06,"wp":[16.29706,121.04263],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3385},{"i":4544,"cid":"22DN0068","pid":"P00620641LZ","t":"Construction of Slope Protection Structure, Sitio San Ysiro, Brgy. San Jose, Antipolo City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48946916.5,"abc":49000000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-10-25","lat":14.66013,"lon":121.272606,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[4373,4550,4571,4609,4630,4635,4731,4738,4851],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1024},{"i":4545,"cid":"23OB0101","pid":"P00725943LZ","t":"Rehabilitation of Flood Mitigation Structure, Sapang Liwanag Creek at Barangay San Miguel, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":4416000.0,"abc":4649690.93,"fy":"2023","sd":"02/06/2023","cd":"2023-03-07","lat":14.569395,"lon":121.089887,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Sapang Liwanag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3386},{"i":4546,"cid":"23DI0046","pid":"P00725826LZ","t":"Construction of Flood Protection Structure Phase 1, (Biñan-Sta.Rosa Boundary), Biñan Side, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":96498518.01,"abc":96500000.0,"fy":"2023","sd":"02/24/2023","cd":"2024-02-02","lat":14.268822,"lon":121.063828,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3387},{"i":4547,"cid":"22PK0014","pid":"P00620489LZ","t":"Construction of Yakyak Mabilong - Malusong Flood Control Structure, Sta. 170+200 - Sta. 170+275 (B.S.), Mabilong and Antonio Canao, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES","c":8405370.83,"abc":9800000.0,"fy":"2022","sd":"03/02/2022","cd":"2023-08-22","lat":17.34694,"lon":121.1733,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":75.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3388},{"i":4548,"cid":"24ED0020","pid":"P00821605LZ","t":"Construction of Bucayao-Panggalaan River Control along Barangay Buhuan, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ETVR TRADING & CONSTRUCTION","c":48999995.96,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-22","lat":13.314722,"lon":121.220833,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao-Panggalaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buhuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3389},{"i":4549,"cid":"24PM0029","pid":"P00823328LZ","t":"Construction of Lias Flood Control Structure (Section 1L), Sta. 055+825 - Sta. 056+700 (Right Side), Barlig, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"BARLIG (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"E.T. LATAWAN CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-08-12","lat":17.0839,"lon":121.1447,"sm":166,"fm":166,"tm":166,"am":166,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":875.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3390},{"i":4550,"cid":"22DN0053","pid":"P00620254LZ","t":"Construction of Slope Protection Structure along Sitio San Joseph to Sitio San Ysiro Road, Brgy. San Jose, Antipolo City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"MARCBILT CONSTRUCTION, INC. / DJSEVILLA CONSOLIDATED BUILDERS CORPORATION (FORMER:TOP-BEST ENGINEERING WORKS & SUPPLIES)","c":91521089.25,"abc":91675000.0,"fy":"2022","sd":"03/07/2022","cd":"2023-04-30","lat":14.66013,"lon":121.27268,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[4373,4544,4571,4609,4630,4635,4731,4738,4851],"L":"field","s":23,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":968},{"i":4551,"cid":"23OB0337","pid":"P00742235LZ","t":"Rehabilitation of Drainage System (Box Culvert) at Pio Felipe St. at Barangay New Lower Bicutan, Taguig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JAYMAR BUILDERS","c":27924104.19,"abc":29399883.49,"fy":"2023","sd":"06/08/2023","cd":"2024-03-14","lat":14.508278,"lon":121.063829,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Lower Bicutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3391},{"i":4552,"cid":"22OB0197","pid":"P00632708LZ","t":"Rehabilitation of Drainage System (Alleys), Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION","c":18607744.39,"abc":19599189.82,"fy":"2022","sd":"02/08/2022","cd":"2023-04-17","lat":14.649746,"lon":121.089942,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3392},{"i":4553,"cid":"22PL0056","pid":"P00632785LZ","t":"Construction of Casabsaba-an/ Balawag/Amlao Proper/Bliss Flood Control, Brgy. Bulanao/Balawag/Amlao/ Nambaran, Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"BAGWIS CONSTRUCTION","c":4811362.67,"abc":4939337.0,"fy":"2022","sd":"04/08/2022","cd":"2022-07-15","lat":17.39059,"lon":121.385812,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulanao/Balawag/Amlao/ Nambaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3393},{"i":4554,"cid":"23E00045","pid":"P00736033LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Bagong Buhay Section, Barangay Tagumpay, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217122749.3,"abc":217124999.5,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.1892,"lon":121.1738,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.12,"wp":[13.18687,121.18386],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3394},{"i":4555,"cid":"23E00047","pid":"P00736035LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Bagong Pook Section, Barangay Inarawan, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217123234.3,"abc":217125000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.2089,"lon":121.1738,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.89,"wp":[13.20614,121.19099],"wst":"matched","br":"Inarawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3395},{"i":4556,"cid":"22DC0029","pid":"P00632873LZ","t":"Rehabilitation of Line Canal in Tanauan City, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF TANAUAN (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"JERIS CONSTRUCTION AND SUPPLY","c":4823615.6,"abc":8910000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-01","lat":14.081896,"lon":121.144978,"sm":429,"fm":429,"tm":180,"am":429,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":19,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":26.9,"text":"The record contradicts itself: the municipality field and the pin point to City of Tanauan, Batangas, but the title names Batangas City, Batangas, 27 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":635},{"i":4557,"cid":"24DI0005","pid":"P00820374LZ","t":"Construction of Riverbank Protection Structure along Maitim Waterways, near F.T. San Luis Road, Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":93564706.0,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2025-01-21","lat":14.173592,"lon":121.27412,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3396},{"i":4558,"cid":"24OD0195","pid":"P00844680LZ","t":"Construction of Flood Control Structure, M.B. Asistio St. - Dr. Uyguangco St., Barangay 187, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":28800369.3,"abc":29388151.14,"fy":"2024","sd":"03/26/2024","cd":"2024-11-17","lat":14.765841,"lon":121.064197,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"187","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3397},{"i":4559,"cid":"23DN0072","pid":"P00740652LZ","t":"Construction of Breakwater at Brgy. Kasile, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"FLAG CONSTRUCTION CORPORATION(FOR. FLAG CONSTRUCTI","c":9799998.77,"abc":9800000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-09-22","lat":14.399647,"lon":121.221317,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kasile","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3398},{"i":4560,"cid":"23DN0073","pid":"P00740653LZ","t":"Construction of Breakwater at Brgy. Bombong, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"MAK-JAMS CONSTRUCTION","c":4899993.44,"abc":4900000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-05-27","lat":14.393253,"lon":121.221419,"sm":206,"fm":206,"tm":206,"am":206,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bombong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3399},{"i":4561,"cid":"21DO0071","pid":"P00561562LZ","t":"Construction of Slope Protection at Creek, Sitio Maliya Purok 7, Barangay Sampad, Cardona, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Cardona","deo":"Rizal 2nd District Engineering Office","co":"PEARLCAST CONSTRUCTION & TRADING","c":4801495.3,"abc":4950000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-09-19","lat":14.4457,"lon":121.2219,"sm":334,"fm":null,"tm":334,"am":334,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sampad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3400},{"i":4562,"cid":"22DN0139","pid":"P00639497LZ","t":"Construction of Creekwall Protection/riprapping near chapel, Barangay Kinagatan, Binangonan, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"R.S. MESA CONSTRUCTION CORPORATION","c":4899788.04,"abc":4900000.0,"fy":"2022","sd":"07/13/2022","cd":"2022-12-09","lat":14.38624,"lon":121.22195,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kinagatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3401},{"i":4563,"cid":"22DN0074","pid":"P00632910LZ","t":"Construction of Flood Control Structure at Angono River, Barangay San Vicente (Package 2), Angono, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"ANGONO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"J.H.R. ENTERPRISES","c":42347638.77,"abc":49500000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-12-19","lat":14.51691,"lon":121.145113,"sm":62,"fm":62,"tm":62,"am":62,"md":0.03,"ls":"boundary","ww":"Angono","wn":"Angono River","wd":0.01,"wp":[14.51686,121.14517],"wst":"matched","br":"San Vicente","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3402},{"i":4564,"cid":"21OB0241","pid":"P00561213LZ","t":"Rehabilitation/Improvement including Drainage System at Brgy. Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"City of Pasig","deo":"Metro Manila 1st District Engineering Office","co":"1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION)","c":13960378.73,"abc":14699777.54,"fy":"2021","sd":"01/11/2022","cd":"2022-07-31","lat":14.56,"lon":121.09,"sm":412,"fm":null,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4854,4884,4899,4932,4981],"L":"records","s":39,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":314},{"i":4565,"cid":"23ED0029","pid":"P00727186LZ","t":"Construction of Bucayao Flood Control Structure along Barangay Buhuan, Sta. 0 + 000 - Sta. 0 + 161.70, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ETVR TRADING & CONSTRUCTION","c":38599985.72,"abc":38600000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-07-18","lat":13.315,"lon":121.2222,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buhuan","len":161.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3403},{"i":4566,"cid":"22DI0063","pid":"P00632895LZ","t":"Construction of Drainage in Barangay Bayog, Los Baños, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"A.I.A. CONSTRUCTION","c":5939211.58,"abc":5940000.0,"fy":"2022","sd":"03/09/2022","cd":"2022-07-06","lat":14.18865,"lon":121.27417,"sm":813,"fm":813,"tm":813,"am":192,"md":1.35,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3404},{"i":4567,"cid":"21DO0064","pid":"P00561563LZ","t":"Construction of Slope Protection at Maislap Creek (Southville 8C Phase 1 and Southville 8B Phase 5), Barangay San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"L. EUSEBIO ACE DEVELOPMENT CORPORATION","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-11","lat":14.753022,"lon":121.145267,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Maislap","wn":"Maislap creek","wd":0.91,"wp":[14.76056,121.14868],"wst":"matched","br":"San Isidro","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[4336,4681,4713,4755,4781,4788,4814,4821,4850,4852,4885],"L":"field","s":20,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1056},{"i":4568,"cid":"21OB0242","pid":"P00561474LZ","t":"Improvement of Ilugin River, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"City of Pasig","deo":"Metro Manila 1st District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":9304693.59,"abc":9799569.58,"fy":"2021","sd":"02/24/2022","cd":"2022-07-23","lat":14.554,"lon":121.09,"sm":412,"fm":null,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Ilugin","wn":"Ilugin River","wd":0.25,"wp":[14.55343,121.09227],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":586},{"i":4569,"cid":"23BC0075","pid":"P00727345LZ","t":"Construction of Bank Protection along Matalag River, Illuru Sur, Rizal, Cagayan (Package I)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"RIZAL (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JAMPAT BUILDERS","c":19255698.77,"abc":19600000.0,"fy":"2023","sd":"02/23/2023","cd":"2024-06-06","lat":17.842278,"lon":121.387222,"sm":1205,"fm":1205,"tm":1205,"am":1205,"md":0.0,"ls":"inside","ww":"Matalag","wn":"Matalag River","wd":0.03,"wp":[17.84247,121.38736],"wst":"matched","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3405},{"i":4570,"cid":"23E00048","pid":"P00740434LZ","t":"Construction of Road Dike/Esplanade along Mag-asawang Tubig River, Sitio Bagong Pag-Asa Section, Barangay Inarawan, Naujan, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) / PROTOSTAR CONSTRUCTION","c":212138142.9,"abc":212299993.4,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":13.2124,"lon":121.1738,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":1.99,"wp":[13.2062,121.19102],"wst":"matched","br":"Inarawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3406},{"i":4571,"cid":"23DN0050","pid":"P00726239LZ","t":"Construction of Flood Control Structure, Sitio Mainit(Phase 2), Barangay San Jose, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"H FRANCISCO CONSTRUCTION AND SUPPLY","c":19599812.56,"abc":19600000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-09-24","lat":14.658688,"lon":121.274664,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[4373,4544,4550,4609,4630,4635,4731,4738,4851],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1102},{"i":4572,"cid":"23DN0009","pid":"P00726237LZ","t":"Construction of Flood Control Structure, Cupang (Downstream) Phase 2, Barangay Cupang, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. / TOP KMC CONSTRUCTION AND SUPPLY CORP.","c":48999987.97,"abc":49000000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-07-20","lat":14.640935,"lon":121.145412,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cupang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3407},{"i":4573,"cid":"22DO0030","pid":"P00620214LZ","t":"Construction of Flood Control Structure Along Puray River, Brgy. San Jose and Brgy, San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / JOAN AND JOHN CONSTRUCTION AND TRADING","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-05-16","lat":14.742778,"lon":121.145556,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Puray","wn":"Puray River","wd":0.02,"wp":[14.74275,121.14574],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3408},{"i":4574,"cid":"24DO0080","pid":"P00844777LZ","t":"Construction of Drainage along Sagbat - Pililla Diversion Road K0050+448 - K0052+000, Baras, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BARAS (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"MEGA M BUILDERS CORPORATION (FORMERLY: MEGA M BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-12-10","lat":14.5219,"lon":121.27529,"sm":160,"fm":160,"tm":160,"am":160,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3409},{"i":4575,"cid":"21DN0110","pid":"P00525648LZ","t":"Construction of Flood Control Structures of Angono River, Brgy. Poblacion Ibaba, Sta. 0-400, Angono, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Angono","deo":"Rizal 1st District Engineering Office","co":"EL-JAKE BUILDERS / C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR","c":42573262.64,"abc":46320000.0,"fy":"2021","sd":"04/06/2022","cd":"2022-10-02","lat":14.51727,"lon":121.1458,"sm":62,"fm":null,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":"Angono","wn":"Angono River","wd":0.0,"wp":[14.51727,121.14579],"wst":"matched","br":"Poblacion Ibaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3410},{"i":4576,"cid":"22DI0151","pid":"P00631301LZ","t":"Construction of Flood Control Project, Bay Lakeshore Protection, Sitio Pinak San Antonio, Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":19597737.55,"abc":19600000.0,"fy":"2022","sd":"01/09/2023","cd":"2023-12-11","lat":14.193867,"lon":121.276858,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3411},{"i":4577,"cid":"23PK0010","pid":"P00726662LZ","t":"Construction of Sukot Flood Control along Chico River, Sta. 188 + 650 - Sta. 188 + 800 (RS), Poblacion, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"FEREST DWAYNE CONSTRUCTION","c":9798721.6,"abc":9800000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-12-15","lat":17.260278,"lon":121.14611,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.07,"wp":[17.25976,121.14643],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3412},{"i":4578,"cid":"23BJ0034","pid":"P00725664LZ","t":"Construction of Flood Control Structures at Mangayang Section, Aritao, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"ARITAO (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96499860.98,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-15","lat":16.31138,"lon":121.06444,"sm":74,"fm":74,"tm":74,"am":544,"md":0.45,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3413},{"i":4579,"cid":"24DO0074","pid":"P00846095LZ","t":"Construction of River Capacity Enhancement Structure along Teresa River, Sitio Abuyod, Barangay May-Iba, Teresa, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TERESA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-10-21","lat":14.5788,"lon":121.22221,"sm":1560,"fm":1560,"tm":1560,"am":1560,"md":0.0,"ls":"inside","ww":"Teresa","wn":"Teresa River","wd":0.01,"wp":[14.57872,121.22222],"wst":"matched","br":"May-Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3414},{"i":4580,"cid":"24PK0009","pid":"P00820767LZ","t":"Construction of Tawang Flood Control along Cal-owan River, Tawang, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"BALBALAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":5309149.1,"abc":5390000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-06-07","lat":17.60121,"lon":121.27732,"sm":125,"fm":125,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":"Cal-owan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3415},{"i":4581,"cid":"22DI0109","pid":"P00640558LZ","t":"Rehabilitation of Drainage System along Barangay I, Barangay II, Barangay III, Barangay IV and Barangay V, Calamba City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"FOURTH GENERATION T CONSTRUCTION","c":7260777.0,"abc":7425000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-04-24","lat":14.16715,"lon":121.14618,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3416},{"i":4582,"cid":"23OD0202","pid":"P00727016LZ","t":"Construction of Flood Control Wall along the Banks of Creeks along TBWard, Brgy. 188, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"AVECS CORPORATION","c":23947575.3,"abc":24491368.45,"fy":"2023","sd":"05/19/2023","cd":"2023-12-25","lat":14.768637,"lon":121.064833,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"188","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3417},{"i":4583,"cid":"24CN0070","pid":"P00838514LZ","t":"Construction of Flood Control Structure, Brgy. Butas na Bato, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":28950000.0,"abc":28950000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-09-20","lat":15.378144,"lon":121.387795,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Butas na Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3418},{"i":4584,"cid":"24ED0067","pid":"P00825127LZ","t":"Construction of River Control Structure Along Panggalaan River, Brgy. San Nicolas, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96499897.0,"abc":98000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-03-26","lat":13.243611,"lon":121.173889,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"River Control Structure Along Panggalaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3419},{"i":4585,"cid":"24OB0289","pid":"P00821083LZ","t":"Construction of Slope Protection Structure along Labasan River (East Bank), Package 1, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION / RVDP CONSTRUCTION","c":75532335.57,"abc":77199789.57,"fy":"2024","sd":"06/04/2024","cd":"2024-10-28","lat":14.53331,"lon":121.090115,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Labasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3420},{"i":4586,"cid":"21DD0263","pid":"P00525615LZ","t":"Construction of Drainage System, Quilo-Quilo - San Carlos Road, Padre Garcia, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"Padre Garcia","deo":"Batangas 4th District Engineering Office","co":"IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION (FORMERLY: IKM BUILDERS & CONSTRUCTION SUPPLY) / T. SOLOMON CONSTRUCTION AND DEVELOPMENT CORPORATIO","c":59514213.0,"abc":61347945.0,"fy":"2021","sd":"11/09/2021","cd":"2022-08-05","lat":13.8589,"lon":121.22332,"sm":1052,"fm":null,"tm":1052,"am":1052,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3421},{"i":4587,"cid":"24CF0003","pid":"P00821223LZ","t":"Construction of Flood Control Structure (Gabion) at Pampanga River, Barangay Ligaya, Gabaldon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GABALDON (BITULOK & SABANI) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":85112899.88,"abc":86849993.44,"fy":"2024","sd":"02/16/2024","cd":"2024-05-23","lat":15.502539,"lon":121.278656,"sm":559,"fm":559,"tm":559,"am":559,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":19.01,"wp":[15.5945,121.12902],"wst":"matched","br":"Ligaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3422},{"i":4588,"cid":"23DD0253","pid":"P00742417LZ","t":"Construction of Drainage System at Barangay San Carlos, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"TERAVERA CORPORATION","c":9602811.85,"abc":9900000.0,"fy":"2023","sd":"05/19/2023","cd":"2024-04-26","lat":13.94953,"lon":121.14621,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Carlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3423},{"i":4589,"cid":"24OB0196","pid":"P00821082LZ","t":"Construction of Slope Protection Structure along Labasan River (East Bank) Package 3, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HALREY CONSTRUCTION INC.","c":94550679.0,"abc":96499978.57,"fy":"2024","sd":"02/13/2024","cd":"2024-09-11","lat":14.533203,"lon":121.090399,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Labasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3424},{"i":4590,"cid":"21ED0164","pid":"P00561469LZ","t":"Construction of Calapan City River Control, Ibaba West to Lumangbayan, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"City of Calapan","deo":"Mindoro Oriental District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":94086578.05,"abc":96500000.0,"fy":"2021","sd":"04/10/2022","cd":"2023-06-10","lat":13.413888,"lon":121.174166,"sm":377,"fm":null,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Calapan City","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[4596],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 159,947,607.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":809},{"i":4591,"cid":"24ED0018","pid":"P00821602LZ","t":"Construction of Abaton River Control, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MARTINEZ ENTERPRISES / FRAMECON BUILDERS","c":48996963.79,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-20","lat":13.385833,"lon":121.225278,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Abaton","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3425},{"i":4592,"cid":"24OD0181","pid":"P00838474LZ","t":"Construction of Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 200, Barangay 178, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES)","c":47851161.52,"abc":48996694.37,"fy":"2024","sd":"03/26/2024","cd":"2024-11-18","lat":14.761637,"lon":121.064851,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"178","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3426},{"i":4593,"cid":"23BC0076","pid":"P00727346LZ","t":"Construction of Bank Protection along Matalag River, Illuru Sur, Rizal, Cagayan (Package II)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"RIZAL (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"FLAVIE CIVIL ENGINEERING CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-10-11","lat":17.841944,"lon":121.388333,"sm":1205,"fm":1205,"tm":1205,"am":1205,"md":0.0,"ls":"inside","ww":"Matalag","wn":"Matalag River","wd":0.01,"wp":[17.84187,121.38828],"wst":"matched","br":null,"len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3427},{"i":4594,"cid":"23PB0001","pid":"P00726655LZ","t":"Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 414 - Sta. 37 + 664 (R/S), Barangay Paddaoan, Conner, Apayao","w":"Construction of Revetment","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CONNER (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"GKA ENGINEERING AND CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"02/12/2023","cd":"2023-06-22","lat":17.799808,"lon":121.282278,"sm":452,"fm":452,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Barren","wn":"Baren River","wd":0.9,"wp":[17.8041,121.28954],"wst":"matched","br":"Paddaoan","len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3428},{"i":4595,"cid":"21DO0049","pid":"P00561799LZ","t":"Construction / Rehabilitation of Flood Control Structures along Mangahan River, Brgy Mangahan, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":29032498.29,"abc":29700000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-09","lat":14.720972,"lon":121.146967,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Mangahan","wn":"Manggahan River","wd":0.0,"wp":[14.72094,121.14699],"wst":"matched","br":"Mangahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3429},{"i":4596,"cid":"21ED0165","pid":"P00526332LZ","t":"Construction of Calapan River Control along Ibaba Section, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"City of Calapan","deo":"Mindoro Oriental District Engineering Office","co":"A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":65861028.99,"abc":67550000.0,"fy":"2021","sd":"03/22/2022","cd":"2023-04-06","lat":13.413888,"lon":121.174166,"sm":377,"fm":null,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Calapan","wn":"Calapan River","wd":0.0,"wp":[13.41389,121.1742],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4590],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 159,947,607.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":840},{"i":4597,"cid":"23ED0027","pid":"P00727182LZ","t":"Construction of Abaton Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 141.68, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MARTINEZ ENTERPRISES / FRAMECON BUILDERS","c":33770105.07,"abc":33775000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-09-05","lat":13.38722,"lon":121.2253,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":141.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3430},{"i":4598,"cid":"24EI0023","pid":"P00821612LZ","t":"Construction of River Control Structure along Gloria River, Malamig Section, Gloria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"GLORIA (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":28822592.66,"abc":29400000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-09-09","lat":12.961583,"lon":121.388389,"sm":589,"fm":589,"tm":589,"am":589,"md":0.0,"ls":"inside","ww":"Gloria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3431},{"i":4599,"cid":"23CE0124","pid":"P00742145LZ","t":"Construction of Flood Control Structures Along Dibolo Creek, Brgy. Del Pilar, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION)","c":98993408.99,"abc":99000000.0,"fy":"2023","sd":"04/13/2023","cd":"2023-09-05","lat":15.697977,"lon":121.090469,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Dibolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Del Pilar","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3432},{"i":4600,"cid":"23CF0038","pid":"P00725727LZ","t":"Construction of Flood Control Structure (Gabion) at Pampanga River, Barangay Ligaya, Gabaldon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GABALDON (BITULOK & SABANI) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":77199989.01,"abc":77199958.44,"fy":"2023","sd":"02/21/2023","cd":"2023-07-18","lat":15.514,"lon":121.2826,"sm":559,"fm":559,"tm":559,"am":559,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":18.73,"wp":[15.59468,121.12913],"wst":"matched","br":"Ligaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3433},{"i":4601,"cid":"21ED0199","pid":"P00561399LZ","t":"Rehabilitation of Ibaba West Protection Dike/Wall at Brgy. Ibaba West, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"City of Calapan","deo":"Mindoro Oriental District Engineering Office","co":"ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION)","c":7698096.56,"abc":7920000.0,"fy":"2021","sd":"03/10/2022","cd":"2022-08-22","lat":13.41333,"lon":121.1742,"sm":377,"fm":null,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ibaba West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3434},{"i":4602,"cid":"22DO0014","pid":"P00631314LZ","t":"Rehabilitation of Bank Protection Structure at Brgy. Balite, Rodriguez, Rizal","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-08-22","lat":14.736338,"lon":121.147085,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3435},{"i":4603,"cid":"24DN0001","pid":"P00820939LZ","t":"Construction of Flood Control Structure, Binayoyo River (Downstream) Phase 5, Barangay Calawis, Antipolo City, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC.","c":48998726.0,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-29","lat":14.662659,"lon":121.225899,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Binayoyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[4642,4653,4690,4778,4800,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":879},{"i":4604,"cid":"22OC0020","pid":"P00620371LZ","t":"Rehabilitation/ Upgrading and Drainage Improvement along 13th Avenue (J.P. Rizal Ext'n to C5) and its Vicinity, Brgy. East Rembo, Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"C.B. TAMPENGCO CONSTRUCTION & SUPPLY","c":5390000.0,"abc":5390000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-05","lat":14.554488,"lon":121.064905,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"East Rembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3436},{"i":4605,"cid":"22DI0081","pid":"P00620241LZ","t":"Construction of River Protection along Biñan River, Brgy. De La Paz, Biñan City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF BIÑAN (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":93431009.87,"abc":93530695.0,"fy":"2022","sd":"04/04/2022","cd":"2022-11-16","lat":14.35552,"lon":121.09053,"sm":371,"fm":371,"tm":371,"am":371,"md":0.0,"ls":"inside","ww":"Biñan","wn":"Biñan River","wd":0.02,"wp":[14.35535,121.09049],"wst":"matched","br":"De La Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3437},{"i":4606,"cid":"22CN0105","pid":"P00631147LZ","t":"Construction of Flood Control Structure, Brgy. Aplaya, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-08-22","lat":15.38214,"lon":121.39103,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Aplaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3438},{"i":4607,"cid":"22PK0086","pid":"P00644766LZ","t":"Repair/Rehabilitation of National Road along Lubuagan-Batong Buhay-Abra Bdry. Road, K0464 + 000 - K0464 + 050, K0464 + 800 - K0464 + 815, Lower Uma, Lubuagan, Kalinga","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":3195154.18,"abc":3312626.46,"fy":"2022","sd":"01/12/2023","cd":"2023-10-25","lat":17.37538,"lon":121.14715,"sm":817,"fm":817,"tm":817,"am":1108,"md":0.3,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3439},{"i":4608,"cid":"23ED0067","pid":"P00742460LZ","t":"Construction of Drainange Canal at Atis St., lalud, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MADSAM ENTERPRISES","c":4949602.2,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-09-02","lat":13.40028,"lon":121.1742,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Drainange","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3440},{"i":4609,"cid":"22DN0023","pid":"P00620640LZ","t":"Construction of Slope Protection Structure, Sitio Mainit, Brgy. San Jose, Antipolo City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"QUATRIX CONSTRUCTION AND SUPPLY INC.","c":9799467.61,"abc":9800000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-08-14","lat":14.64593,"lon":121.28434,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[4373,4544,4550,4571,4630,4635,4731,4738,4851],"L":"field","s":17,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1116},{"i":4610,"cid":"21PK0028","pid":"P00525931LZ","t":"Construction of RHU Lower Uma Flood Control Sta. 180+050 - Sta. 180+110 (R.S.), Lower Uma, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Lubuagan","deo":"Upper Kalinga District Engineering Office","co":"SONBLESSED CONSTRUCTION AND SUPPLY","c":2702958.75,"abc":2940000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-08-10","lat":17.3925,"lon":121.22722,"sm":817,"fm":null,"tm":817,"am":424,"md":0.51,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3441},{"i":4611,"cid":"23DI0118","pid":"P00740387LZ","t":"Construction of Structure for River Protection Along Malitlit Waterways, (Near Ust), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"WAWAO BUILDERS","c":96408436.09,"abc":96500000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-02-08","lat":14.255297,"lon":121.090697,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3442},{"i":4612,"cid":"22DD0152","pid":"P00640548LZ","t":"Rehabilitation of Drainage System, Barangay Adya and Barangay Cumba, Lipa City, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL","c":13443880.0,"abc":13860000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-29","lat":13.86969,"lon":121.14729,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Adya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3443},{"i":4613,"cid":"22DE0059","pid":"P00631284LZ","t":"Construction of Flood Control Structure at Brgy. Jaybanga, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-09","lat":13.675278,"lon":121.285278,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jaybanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3444},{"i":4614,"cid":"24BI0039","pid":"P00824690LZ","t":"Construction of Manamtam Floos Control along Matuno River (Section 2), Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-03-27","lat":16.3919,"lon":121.06493,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Matuno","wn":"Matuno River","wd":0.03,"wp":[16.39168,121.06502],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3445},{"i":4615,"cid":"24ED0022","pid":"P00821610LZ","t":"Construction of Silonay Seawall, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MAMA'S BOY CONSTRUCTION","c":29399989.24,"abc":29400000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-25","lat":13.398276,"lon":121.227571,"sm":377,"fm":377,"tm":377,"am":377,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3446},{"i":4616,"cid":"22ED0081","pid":"P00639520LZ","t":"Construction of Calapan City River Control, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ANORE CONSTRUCTION","c":96626806.12,"abc":98000000.0,"fy":"2022","sd":"07/21/2022","cd":"2023-06-21","lat":13.41389,"lon":121.1744,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Calapan City","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3447},{"i":4617,"cid":"23OB0385","pid":"P00726824LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 6), Taguig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":82472176.94,"abc":86849386.0,"fy":"2023","sd":"03/22/2023","cd":"2023-10-20","lat":14.527686,"lon":121.09075,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[4657,4535],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0384 to 23OB0386) cover the same site, together worth PHP 247,442,958.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":356},{"i":4618,"cid":"24DP0012","pid":"P00839634LZ","t":"Construction of Flood Control Structure, Barangay West Poblacion, Rizal, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"RIZAL (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":1938554.0,"abc":1980000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-06-09","lat":14.11058,"lon":121.39249,"sm":1207,"fm":1207,"tm":1207,"am":1207,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"West Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3448},{"i":4619,"cid":"22DD0254","pid":"P00640550LZ","t":"Rehabilitation of Drainage System, Barangay Calamias and Barangay Mabini, Lipa City Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"KENSAL RISE CONSTRUCTION","c":9603000.0,"abc":9900000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-05","lat":13.86964,"lon":121.14733,"sm":799,"fm":799,"tm":null,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calamias","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3449},{"i":4620,"cid":"21EI0172","pid":"P00561405LZ","t":"Construction of Flood Control Structure - Mauhao River, Bagong Sikat Section, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Bulalacao","deo":"Southern Mindoro District Engineering Office","co":"ANDREM CONSTRUCTION SERVICE","c":9899953.64,"abc":9799477.02,"fy":"2021","sd":"04/07/2022","cd":"2022-09-23","lat":12.351111,"lon":121.286944,"sm":249,"fm":null,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":"Mauhao","wn":"Mauhao River","wd":0.02,"wp":[12.3513,121.28689],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01025,"text":"Contract cost is 1.03% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":969},{"i":4621,"cid":"24OB0088","pid":"P00824587LZ","t":"Rehabilitation of Sapang Malapit Creek, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":16320409.49,"abc":16659775.01,"fy":"2024","sd":"04/08/2024","cd":"2024-11-03","lat":14.57622,"lon":121.09086,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Sapang Malapit","wn":"Sapang Malapit","wd":0.0,"wp":[14.57624,121.09086],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3450},{"i":4622,"cid":"21PK0045","pid":"P00525933LZ","t":"Construction of Banat, Magsilay Proper drainage Sytems Sta. 169+590 - Sta 169+740 (R.S.), Magsilay, Pasil, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"JBC BUILDERS","c":1960000.0,"abc":1960000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-08-22","lat":17.399687,"lon":121.174942,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3451},{"i":4623,"cid":"24BI0051","pid":"P00843253LZ","t":"Construction of Flood Control and Drainage Structure along Cupaz River, San Leonardo Section, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":91675000.0,"abc":91675000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-05-15","lat":16.39824,"lon":121.091322,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Cupaz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3452},{"i":4624,"cid":"25ED0020","pid":"P00921195LZ","t":"Construction of Bucayao River Control at Camansihan Section, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MINDALIFI CONSTRUCTION AND SUPPLY","c":48999976.56,"abc":49000000.0,"fy":"2025","sd":"02/12/2025","cd":"2025-04-14","lat":13.327222,"lon":121.227778,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.02,"wp":[13.3271,121.22789],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3453},{"i":4625,"cid":"24CN0080","pid":"P00838524LZ","t":"Construction of Subsub River Control Structure, Brgy. Davil-davilan, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":16887500.0,"abc":16887500.0,"fy":"2024","sd":"04/30/2024","cd":"2024-09-20","lat":15.393385,"lon":121.39252,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":"Subsub","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Davil-davilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3454},{"i":4626,"cid":"23DI0016","pid":"P00725822LZ","t":"Construction of Revetment along Bay River, Barangay San Isidro and Barangay Dila, Bay, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / FOURTH GENERATION T CONSTRUCTION","c":72369586.56,"abc":72375000.0,"fy":"2023","sd":"02/23/2023","cd":"2024-03-27","lat":14.186693,"lon":121.287043,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":"Bay","wn":"Bay River","wd":0.01,"wp":[14.1867,121.28712],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3455},{"i":4627,"cid":"23OC0023","pid":"P00737392LZ","t":"Rehabilitation of Drainage Structure along J.P. Rizal Extension (including sidewalk and driveway), Makati City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"THE STEADFAST BUILDERS","c":29700000.0,"abc":29700000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-07-14","lat":14.546005,"lon":121.064951,"sm":398,"fm":398,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3456},{"i":4628,"cid":"23DI0086","pid":"P00737519LZ","t":"Rehabilitation of Drainage at Barangay Bucal, Calamba City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"EOZ CONSTRUCTION","c":6748121.34,"abc":6930000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-08-14","lat":14.180912,"lon":121.174992,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bucal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3457},{"i":4629,"cid":"21PM0002","pid":"P00525554LZ","t":"Construction of  Marat Flood Control, Sta. 119 + 470 - Sta. 119 + 520 (R.S.), Sta. 119 + 623.5 - Sta. 119 + 666 (R.S.), Sta. 119 + 672 - Sta. 119 + 880 (R.S.), Sta. 119 + 470 - Sta. 119 + 865 (L.S.), Sta. 119 + 690 - Sta. 119 + 880 (L.S.), Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Paracelis","deo":"Mountain Province 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":84270555.0,"abc":84270555.0,"fy":"2021","sd":"04/07/2022","cd":"2023-01-11","lat":17.18778,"lon":121.39389,"sm":1102,"fm":null,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":885.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3458},{"i":4630,"cid":"22DN0032","pid":"P00620634LZ","t":"Construction of Flood Control Structure, Sitio Upper Kilingan, Brgy. San Jose, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC.","c":29398503.21,"abc":29400000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-07-22","lat":14.62686,"lon":121.28799,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[4851,4373],"cl":[4373,4544,4550,4571,4609,4635,4731,4738,4851],"L":"field","s":43,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0028 to 22DN0032) cover the same site, together worth PHP 127,226,749.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":166},{"i":4631,"cid":"24P00012","pid":"P00821143LZ","t":"Construction of Pinto Flood Control, Sta. 32+000 - Sta. 33+550 (RS), Pinto, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION","c":96500000.0,"abc":96492879.47,"fy":"2024","sd":"03/18/2024","cd":"2025-03-05","lat":16.753124,"lon":121.227939,"sm":34,"fm":34,"tm":34,"am":744,"md":22.3,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1550.0,"ph":null,"dup":[4636],"run":[],"cl":[],"L":"records","s":84,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.95,"value":22.3,"text":"The pin is 22.3 km outside Alfonso Lista, Ifugao, the nearest municipality the record claims. It falls in Lamut, Ifugao.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,750,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":10},{"i":4632,"cid":"22OB0313","pid":"P00620004LZ","t":"Bank Improvement / Protection Along Pateros River, Facing Downstream (Phase XIV), Brgy. Ususan, Pateros, Metro Manila","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":68755910.58,"abc":72374642.72,"fy":"2022","sd":"03/24/2022","cd":"2022-09-30","lat":14.535213,"lon":121.064984,"sm":1521,"fm":1521,"tm":1112,"am":398,"md":0.0,"ls":"inside","ww":"Pateros","wn":"Pateros River","wd":0.0,"wp":[14.53519,121.06498],"wst":"matched","br":"Ususan","len":null,"ph":"Phase XIV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3459},{"i":4633,"cid":"23DO0066","pid":"P00727368LZ","t":"Construction of Flood Control Structures Along Manggahan River, Brgy. Manggahan and Brgy. Burgos, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":41638341.17,"abc":49000000.0,"fy":"2023","sd":"06/07/2023","cd":"2023-09-25","lat":14.721183,"lon":121.147437,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan River","wd":0.01,"wp":[14.72111,121.14744],"wst":"matched","br":"Manggahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3460},{"i":4634,"cid":"23DI0010","pid":"P00725820LZ","t":"Construction of Revetment along San Cristobal River (along La Consolacion road), Barangay Looc, Calamba City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MSV CONSTRUCTION AND SUPPLIES","c":93989732.06,"abc":96500000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-31","lat":14.226815,"lon":121.175648,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.05,"wp":[14.22726,121.17548],"wst":"matched","br":"Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3461},{"i":4635,"cid":"23DN0066","pid":"P00726240LZ","t":"Construction of Flood Control Structure, Sitio Upper Kilingan Phase 2, Barangay San Jose, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48990287.77,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-20","lat":14.621148,"lon":121.289591,"sm":365,"fm":365,"tm":365,"am":160,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[4373,4544,4550,4571,4609,4630,4731,4738,4851],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1025},{"i":4636,"cid":"24P00016","pid":"P00821534LZ","t":"Construction of Flood Control Structure along Ibulao River (Mawanini Section) Sta. 329+300 - Sta. 330+275 (R/S), Hapid, Lamut, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"LAMUT (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION","c":48250000.0,"abc":48246600.07,"fy":"2024","sd":"03/18/2024","cd":"2024-12-01","lat":16.753124,"lon":121.227939,"sm":744,"fm":744,"tm":744,"am":744,"md":0.0,"ls":"inside","ww":"Ibulao","wn":"Ibulao River","wd":0.01,"wp":[16.75309,121.22781],"wst":"matched","br":null,"len":975.0,"ph":null,"dup":[4631],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,750,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":158},{"i":4637,"cid":"24PJ0021","pid":"P00824841LZ","t":"Construction of Halag Flood Control, Sta. 54+942 - Sta. 55+442 (R/S), Sta. 55+712 - Sta. 56+162 (R/S), Halag, Aguinaldo, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"MAYOYAO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"JLY CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":67550000.0,"abc":67520258.68,"fy":"2024","sd":"02/20/2024","cd":"2024-08-27","lat":16.857226,"lon":121.394024,"sm":12,"fm":963,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.53,"text":"The record contradicts itself: the title and the pin point to Aguinaldo, Ifugao, but the municipality field names Mayoyao, Ifugao, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":500},{"i":4638,"cid":"22BC0119","pid":"P00621527LZ","t":"Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-11","lat":18.562646,"lon":121.091471,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":0.95,"wp":[18.57079,121.08876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3462},{"i":4639,"cid":"23BC0017","pid":"P00726116LZ","t":"Construction of Pata Flood Control Structure along Pata River, Pata, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"MILESTONE 888 CONSTRUCTION INC.","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/03/2023","cd":"2024-02-16","lat":18.6155,"lon":121.14748,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Pata","wn":"Pata River","wd":0.05,"wp":[18.61576,121.14792],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3463},{"i":4640,"cid":"23DI0022","pid":"P00726227LZ","t":"Construction of Revetment along San Cristobal River, Barangay Looc, Calamba City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"PASCAL CONSTRUCTION","c":47780973.8,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-11-22","lat":14.2278,"lon":121.176,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.04,"wp":[14.22749,121.17612],"wst":"matched","br":"Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3464},{"i":4641,"cid":"23ED0021","pid":"P00727184LZ","t":"Construction of CSR Drainage Canal K0042 + 066 - K0042 + 471","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"VICTORIA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"JCL86 BUILDERS INC.","c":4604034.99,"abc":4604040.0,"fy":"2023","sd":"03/30/2023","cd":"2023-06-27","lat":13.126848,"lon":121.290262,"sm":1629,"fm":1629,"tm":null,"am":1629,"md":0.0,"ls":"inside","ww":"CSR Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3465},{"i":4642,"cid":"23DN0034","pid":"P00726245LZ","t":"Construction of Flood Control Structure, Binayoyo (Downstream) Phase 3, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BELL CONSTRUCTION","c":48999997.09,"abc":49000000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-09-24","lat":14.657725,"lon":121.228494,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calawis","len":null,"ph":"Phase 3","dup":[],"run":[4908,4653,4816],"cl":[4603,4653,4690,4778,4800,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":50,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DN0033 to 23DN0036) cover the same site, together worth PHP 176,396,548.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":104},{"i":4643,"cid":"24OB0192","pid":"P00821075LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 6), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94569489.5,"abc":96499479.08,"fy":"2024","sd":"02/13/2024","cd":"2024-09-11","lat":14.497358,"lon":121.065026,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[4090,4091,4092,4682,4669,4504,4453],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":357},{"i":4644,"cid":"23OB0202","pid":"P00742233LZ","t":"Drainage Improvement in Brgy. Malanday, Marikina City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"BELL CONSTRUCTION","c":15747899.0,"abc":16579997.38,"fy":"2023","sd":"06/08/2023","cd":"2024-01-03","lat":14.648989,"lon":121.091535,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malanday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3466},{"i":4645,"cid":"23EI0037","pid":"P00742464LZ","t":"Construction of Drainage Canal at Sitio Langka, Brgy. Inclanay, Pinamalayan, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PINAMALAYAN (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":4892177.49,"abc":4949948.96,"fy":"2023","sd":"03/24/2023","cd":"2023-06-26","lat":12.998889,"lon":121.395278,"sm":1140,"fm":1140,"tm":1140,"am":1140,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inclanay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3467},{"i":4646,"cid":"21PK0044","pid":"P00525940LZ","t":"Construiction of Pantikian Drainage Systems Sta. 154+600 - Sta. 154+840 (B.S.), Pantikian, Balbalan, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Balbalan","deo":"Upper Kalinga District Engineering Office","co":"SALTAN RIVER CORPORATION","c":2886474.56,"abc":2940000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-10-24","lat":17.26417,"lon":121.14766,"sm":125,"fm":null,"tm":125,"am":1569,"md":18.25,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.92,"value":18.25,"text":"The pin is 18.2 km outside Balbalan, Kalinga, the nearest municipality the record claims. It falls in Tinglayan, Kalinga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":315},{"i":4647,"cid":"23DI0044","pid":"P00725795LZ","t":"Construction of River Protection Structure along Bay River, Brgy. San Isidro, Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":47042828.71,"abc":48250000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-12-31","lat":14.191138,"lon":121.290845,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":"Bay","wn":"Bay River","wd":0.02,"wp":[14.19102,121.29096],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3468},{"i":4648,"cid":"22P00085","pid":"P00621004LZ","t":"Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+800 and Sta. 18+985 - Sta. 19+111 (Pieza Side), Lamut, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"LAMUT (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION","c":38105039.76,"abc":38109134.61,"fy":"2022","sd":"08/09/2022","cd":"2023-07-13","lat":16.6483,"lon":121.1764,"sm":744,"fm":744,"tm":744,"am":744,"md":0.0,"ls":"inside","ww":"Lamut","wn":"Lamut River","wd":0.17,"wp":[16.64814,121.17795],"wst":"matched","br":null,"len":626.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3469},{"i":4649,"cid":"23BC0097","pid":"P00742296LZ","t":"Construction of River Control along Langgangan River in Sta. Praxedes, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"DANDEX CONSTRUCTION","c":4900020.07,"abc":4950000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-07-14","lat":18.565833,"lon":121.228611,"sm":442,"fm":442,"tm":null,"am":1365,"md":7.54,"ls":"outside","ww":"Langgangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.79,"value":7.54,"text":"The pin is 7.5 km outside Claveria, Cagayan, the nearest municipality the record claims. It falls in Sanchez-Mira, Cagayan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":346},{"i":4650,"cid":"24DC0088","pid":"P00846040LZ","t":"Construction of Flood Mitigation, Lake Wall, Purok 4 and 5 Brgy Kinalaglagan, Mataasnakahoy, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MATAASNAKAHOY (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"ISHIZAKI CONSTRUCTION & DEVELOPMENT CORPORATION","c":4948945.76,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-10","lat":14.004053,"lon":121.091711,"sm":949,"fm":949,"tm":949,"am":949,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kinalaglagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3470},{"i":4651,"cid":"22DD0067","pid":"P00630951LZ","t":"Construction of Revetment along Malaking Ilog River (Phase 3), Barangay Lipahan, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":70198191.76,"abc":72375000.0,"fy":"2022","sd":"02/25/2022","cd":"2022-10-31","lat":13.84575,"lon":121.396,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Malaking Ilog","wn":"Malaking Ilog","wd":31.5,"wp":[13.8567,121.10482],"wst":"matched","br":"Lipahan","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3471},{"i":4652,"cid":"23DO0055","pid":"P00726257LZ","t":"Construction of Flood Control Structure Along Puray River, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":40554378.68,"abc":49000000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-09-25","lat":14.73706,"lon":121.147801,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Puray","wn":"Puray River","wd":0.03,"wp":[14.73712,121.14749],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3472},{"i":4653,"cid":"23DN0035","pid":"P00726247LZ","t":"Construction of Flood Control Structure, Binayoyo (Downstream) Phase 4, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BELL CONSTRUCTION","c":48999994.47,"abc":49000000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-12-22","lat":14.660426,"lon":121.229056,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calawis","len":null,"ph":"Phase 4","dup":[],"run":[4908,4642,4816],"cl":[4603,4642,4690,4778,4800,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":50,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DN0033 to 23DN0036) cover the same site, together worth PHP 176,396,548.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":105},{"i":4654,"cid":"22DI0150","pid":"P00631299LZ","t":"Construction of Flood Control Project, Bay Lakeshore Protection - Brgy. Tagumpay Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":19596179.97,"abc":19600000.0,"fy":"2022","sd":"01/09/2023","cd":"2023-11-28","lat":14.19771,"lon":121.29134,"sm":192,"fm":192,"tm":null,"am":192,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tagumpay Bay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3473},{"i":4655,"cid":"21OC0101","pid":"P00561152LZ","t":"Construction of Revetment Wall along Makati - Pateros (Phase II), Brgy. East Rembo, Makati City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"AARCON BUILDERS","c":33648374.93,"abc":34300000.0,"fy":"2021","sd":"03/01/2021","cd":"2022-08-22","lat":14.554826,"lon":121.065172,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"East Rembo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3474},{"i":4656,"cid":"23DD0188","pid":"P00726928LZ","t":"Construction of Revetment along Malaking Ilog River (Lipahan Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-21","lat":13.84554,"lon":121.39735,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Malaking Ilog","wn":"Malaking Ilog","wd":31.65,"wp":[13.8567,121.10482],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3475},{"i":4657,"cid":"23OB0384","pid":"P00726823LZ","t":"Bank Improvement/Protection along C-6 Open Channel (Phase 5), Taguig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.)","c":82463675.76,"abc":86849579.53,"fy":"2023","sd":"03/22/2023","cd":"2023-10-20","lat":14.528513,"lon":121.091943,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[4617,4535],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0384 to 23OB0386) cover the same site, together worth PHP 247,442,958.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":358},{"i":4658,"cid":"24E00034","pid":"P00823572LZ","t":"Construction of Road Dike/Esplanade along Pangalaan River (Left Side), Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":289496391.8,"abc":289500000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-07-15","lat":13.238982,"lon":121.176454,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Pangalaan","wn":"Panggalaan River","wd":0.03,"wp":[13.23903,121.1762],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3476},{"i":4659,"cid":"24DC0069","pid":"P00839110LZ","t":"Rehabilitation of Line Canal, Barangay Poblacion 4, City of Tanauan, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF TANAUAN (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"JERIS CONSTRUCTION AND SUPPLY","c":4948737.0,"abc":4950000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-06-17","lat":14.090398,"lon":121.147889,"sm":429,"fm":429,"tm":429,"am":429,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3477},{"i":4660,"cid":"22DI0061","pid":"P00620245LZ","t":"Construction of River Protection Structure near Anos Bridge, (Downstream), Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":86847262.08,"abc":86850000.0,"fy":"2022","sd":"03/09/2022","cd":"2023-01-08","lat":14.18712,"lon":121.229374,"sm":813,"fm":813,"tm":813,"am":813,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3478},{"i":4661,"cid":"22CD0208","pid":"P00637017LZ","t":"Construction of Slope Protection, Brgy. Gumaok East - Central, City of San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96471127.99,"abc":96499596.86,"fy":"2022","sd":"05/26/2022","cd":"2023-05-18","lat":14.79792,"lon":121.06532,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gumaok East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3479},{"i":4662,"cid":"23DD0178","pid":"P00742185LZ","t":"Construction of Slope Protection Structure along Malaking Ilog (Phase 1), Brgy. Lipahan, San Juan, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"STRUKTURA TEKNIKA SERVICES CO. / E.M. CUERPO, INC.","c":96030000.0,"abc":99000000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-09-10","lat":13.84497,"lon":121.39776,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lipahan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3480},{"i":4663,"cid":"24OB0274","pid":"P00821436LZ","t":"Construction of Slope Protection Structure along Labasan River (West Bank) Package 2, Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":9603743.18,"abc":9799733.66,"fy":"2024","sd":"04/08/2024","cd":"2024-05-07","lat":14.530943,"lon":121.092154,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Labasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3481},{"i":4664,"cid":"24PJ0022","pid":"P00821539LZ","t":"Construction of Tulaed Flood Control, Sta. 75+970 - Sta. 76+090 (L/S), Sta. 76+297 - Sta. 76+820 (L/S), Tulaed, Mayoyao, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"MA CONSTRUCTION","c":19600000.0,"abc":19596856.89,"fy":"2024","sd":"02/21/2024","cd":"2024-08-18","lat":16.928425,"lon":121.178028,"sm":963,"fm":34,"tm":963,"am":963,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":643.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":26.19,"text":"The record contradicts itself: the title and the pin point to Mayoyao, Ifugao, but the municipality field names Alfonso Lista, Ifugao, 26 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":607},{"i":4665,"cid":"22PB0018","pid":"P00620987LZ","t":"Construction of Apayao River Flood Control Structure, Sta. 82+292 - Sta. 82+592, Brgy. Nagbabalayan, Kabugao, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"KABUGAO (CAPITAL) (APAYAO)","deo":"Apayao 1st District Engineering Office","co":"TAGEL CORPORATION","c":23872800.0,"abc":23871900.8,"fy":"2022","sd":"04/04/2022","cd":"2022-11-28","lat":18.026536,"lon":121.147968,"sm":685,"fm":685,"tm":685,"am":685,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":0.05,"wp":[18.02626,121.14761],"wst":"matched","br":"Nagbabalayan","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3482},{"i":4666,"cid":"21ED0082","pid":"P00526453LZ","t":"Construction of Bucayao River Control along Sitio Caguisikan, Brgy. Gutad, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"City of Calapan","deo":"Mindoro Oriental District Engineering Office","co":"ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":38200927.2,"abc":38220000.0,"fy":"2021","sd":"03/07/2022","cd":"2022-12-14","lat":13.371388,"lon":121.230833,"sm":377,"fm":null,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.16,"wp":[13.37086,121.23222],"wst":"matched","br":"Gutad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3483},{"i":4667,"cid":"21OC0048","pid":"P00525765LZ","t":"Rehabilitation/Upgrading and Drainage Improvement along Duhat St., Banaba St., Mangga St., Alagao St., Acacia Extension, and its Vicinity, Barangay Comembo, Makati City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MAKATI CITY","mu":"City of Makati","deo":"Metro Manila 2nd District Engineering Office","co":"C.B. TAMPENGCO CONSTRUCTION & SUPPLY","c":20481342.58,"abc":21560000.0,"fy":"2021","sd":"03/22/2022","cd":"2023-01-08","lat":14.547928,"lon":121.065385,"sm":398,"fm":null,"tm":398,"am":398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Comembo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3484},{"i":4668,"cid":"24DO0093","pid":"P00846093LZ","t":"Construction of Drainage System, Brgy. Tandang Kutyo, Tanay, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TANAY (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"OLIVER AQUINO CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"04/23/2024","cd":"2024-08-02","lat":14.5032,"lon":121.29253,"sm":1541,"fm":1541,"tm":1541,"am":1541,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandang Kutyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3485},{"i":4669,"cid":"24OB0191","pid":"P00821074LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 5), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94569576.09,"abc":96499567.44,"fy":"2024","sd":"02/13/2024","cd":"2024-09-11","lat":14.498768,"lon":121.065471,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[4090,4091,4092,4682,4643,4504,4453],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":359},{"i":4670,"cid":"23OB0406","pid":"P00727228LZ","t":"Improvement Marikina River at Sta. 15 + 450 to Sta. 16 + 470, Marikina City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":92990387.76,"abc":97943176.43,"fy":"2023","sd":"06/30/2023","cd":"2024-02-09","lat":14.652497,"lon":121.092226,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.01,"wp":[14.65262,121.09219],"wst":"matched","br":null,"len":1020.0,"ph":null,"dup":[],"run":[4971,4130],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0406 to 23OB0408) cover the same site, together worth PHP 279,083,453.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":360},{"i":4671,"cid":"21PK0025","pid":"P00525941LZ","t":"Construction of Sitio Sabangan, Malusong Flood Control Sta. 170+200 - Sta. 170+270 (B.S.), Sitio Sabangan, Antonio Canao, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Lubuagan","deo":"Upper Kalinga District Engineering Office","co":"SONBLESSED CONSTRUCTION AND SUPPLY","c":9211999.11,"abc":9800000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-10-15","lat":17.351809,"lon":121.178448,"sm":817,"fm":null,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":70.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3486},{"i":4672,"cid":"21EI0149","pid":"P00561192LZ","t":"Construction of Drainage Canal at Brgy. Inclanay and Brgy. Zone 3, Pinamalayan, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Pinamalayan","deo":"Southern Mindoro District Engineering Office","co":"ANSAVILLA CONSTRUCTION AND DEVELOPMENT CORPORATION","c":7590509.36,"abc":7840000.0,"fy":"2021","sd":"04/07/2022","cd":"2022-09-18","lat":13.001389,"lon":121.398611,"sm":1140,"fm":null,"tm":1140,"am":1140,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inclanay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3487},{"i":4673,"cid":"21DO0065","pid":"P00561559LZ","t":"Construction of Grouted Riprap Slope Protection Wall along Tarimis Creek from Daang Tubo Street to Mango River, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"JORENZ BUILDERS DEVELOPMENT CORP.","c":15965017.3,"abc":16434000.0,"fy":"2021","sd":"12/16/2021","cd":"2022-11-14","lat":14.7206,"lon":121.1481,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Tarimis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3488},{"i":4674,"cid":"21PK0033","pid":"P00526387LZ","t":"Construction of Bonog-Chico Flood Control along Chico River Sta.182+000 - Sta. 182+070 (L.S), Poblacion, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Tinglayan","deo":"Upper Kalinga District Engineering Office","co":"FEREST DWAYNE CONSTRUCTION","c":3977831.03,"abc":4900000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-12-25","lat":17.263889,"lon":121.148146,"sm":1569,"fm":null,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.25,"wp":[17.26219,121.14963],"wst":"matched","br":null,"len":70.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3489},{"i":4675,"cid":"22BC0029","pid":"P00621039LZ","t":"Construction of Pata Flood Control Structure along Pata River (Sta. 0+000 - Sta. 0+120), Pata, Claveria,Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-12-17","lat":18.614902,"lon":121.148338,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Pata","wn":"Pata River","wd":0.04,"wp":[18.61521,121.1485],"wst":"matched","br":null,"len":120.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3490},{"i":4676,"cid":"23CE0043","pid":"P00726168LZ","t":"Construction of Flood Control Structure along Banco River, Barangay Canaan East, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES / SYMMETRICON BUILDERS CORP.","c":48994904.22,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-06-09","lat":15.695208,"lon":121.148503,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Banco","wn":"Banco River","wd":0.01,"wp":[15.69517,121.14855],"wst":"matched","br":"Canaan East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3491},{"i":4677,"cid":"23DI0043","pid":"P00725794LZ","t":"Construction of River Protection Structure along Bay River, Brgy. Tagumpay, Bay, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"BAY (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":47042947.37,"abc":48250000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-03-21","lat":14.193046,"lon":121.292736,"sm":192,"fm":192,"tm":192,"am":192,"md":0.0,"ls":"inside","ww":"Bay","wn":"Bay River","wd":0.02,"wp":[14.19305,121.29291],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3492},{"i":4678,"cid":"22PK0003","pid":"P00620488LZ","t":"Construction of Tapao Flood Control Structure, Sta. 166+000 - Sta. 166+200 (L.S.), Balbalasang, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"BALBALAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":14326756.83,"abc":14700000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-05-29","lat":17.48593,"lon":121.06565,"sm":125,"fm":125,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3493},{"i":4679,"cid":"23DN0010","pid":"P00726238LZ","t":"Construction of Flood Control Structure, Cupang (Upstream) Phase 2, Barangay Cupang, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. / TOP KMC CONSTRUCTION AND SUPPLY CORP.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-07-31","lat":14.637555,"lon":121.148508,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cupang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3494},{"i":4680,"cid":"22DO0011","pid":"P00620650LZ","t":"Construction of Flood Control and River Bank Protection Structure Along Morong River, Brgy. San Jose and Brgy. San Juan, Morong, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MORONG (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-15","lat":14.514722,"lon":121.230833,"sm":991,"fm":991,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":"Morong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3495},{"i":4681,"cid":"23DO0067","pid":"P00726927LZ","t":"Construction of Flood Control Structure along Puray River, Barangay San Isidro, Rodriguez, Rizal, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":78557807.92,"abc":96500000.0,"fy":"2023","sd":"05/10/2023","cd":"2024-05-27","lat":14.746389,"lon":121.148889,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Puray","wn":"Puray River","wd":0.04,"wp":[14.74664,121.14863],"wst":"matched","br":"San Isidro","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[4336,4567,4713,4755,4781,4788,4814,4821,4850,4852,4885],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":880},{"i":4682,"cid":"24OB0190","pid":"P00821073LZ","t":"Construction of Slope Protection Structure along C-6 Open Channel, (Phase 4), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOUGHBUILT CONSTRUCTION & TRADING, INC.","c":94550154.65,"abc":96499443.41,"fy":"2024","sd":"02/13/2024","cd":"2024-09-11","lat":14.500131,"lon":121.065852,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"C-6 Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[4090,4091,4092,4669,4643,4504,4453],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24OB0187 to 24OB0194) cover the same site, together worth PHP 898,266,746.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":361},{"i":4683,"cid":"23BC0016","pid":"P00726114LZ","t":"Construction of Nangoluan Flood Control Structure along Sanchez Mira River, Sanchez Mira, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANCHEZ-MIRA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION / RAMIKE CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/01/2023","cd":"2023-10-02","lat":18.555277,"lon":121.230833,"sm":1365,"fm":1365,"tm":1365,"am":1365,"md":0.0,"ls":"inside","ww":"Sanchez Mira","wn":"Sanchez Mira River","wd":0.56,"wp":[18.55564,121.23613],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3496},{"i":4684,"cid":"23DD0062","pid":"P00737500LZ","t":"Construction of Drainage Facilities, Barangay Dagatan, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":4800901.5,"abc":4950000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-18","lat":13.96546,"lon":121.18075,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dagatan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3497},{"i":4685,"cid":"22PM0017","pid":"P00620141LZ","t":"Construction of Lower Sakakang Flood Control Structure, Sta. 117+620 - Sta. 118+070 (R.S.), Sta. 117+830 - Sta. 118+180 (L.S.), Bacarri, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":81060000.0,"abc":81060000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-29","lat":17.25556,"lon":121.39972,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3498},{"i":4686,"cid":"21DP0058","pid":"P00561544LZ","t":"Construction of Flood Control Structure along Matanag River, San Pablo City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"San Pablo City","deo":"Laguna 3rd District Engineering Office","co":"T. SOLOMON CONSTRUCTION AND DEVELOPMENT CORPORATIO","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"02/18/2022","cd":"2022-09-15","lat":14.036978,"lon":121.293311,"sm":1346,"fm":null,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":"Matanag","wn":"Matanag River","wd":0.0,"wp":[14.03697,121.29333],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3499},{"i":4687,"cid":"23BC0022","pid":"P00726438LZ","t":"Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":83950800.0,"abc":83950800.0,"fy":"2023","sd":"02/06/2023","cd":"2024-07-12","lat":18.55167,"lon":121.09238,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":2.15,"wp":[18.57079,121.08876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3500},{"i":4688,"cid":"24CE0162","pid":"P00823445LZ","t":"Construction of Flood Control Structure along Banco River, Barangay Canaan East, Rizal, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"RIZAL (NUEVA ECIJA)","deo":"Nueva Ecija 1st District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES / SYMMETRICON BUILDERS CORP.","c":47767448.6,"abc":48250000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-31","lat":15.696425,"lon":121.149797,"sm":1206,"fm":1206,"tm":1206,"am":1206,"md":0.0,"ls":"inside","ww":"Banco","wn":"Banco River","wd":0.02,"wp":[15.69663,121.14989],"wst":"matched","br":"Canaan East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3501},{"i":4689,"cid":"23ED0081","pid":"P00742458LZ","t":"Construction of Malayas River Control, Malabo, Victoria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"VICTORIA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MARTINEZ ENTERPRISES","c":4949993.18,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-04-19","lat":13.16528,"lon":121.2953,"sm":1629,"fm":1629,"tm":1629,"am":1629,"md":0.0,"ls":"inside","ww":"Malayas","wn":"Malayas River","wd":0.01,"wp":[13.16517,121.29525],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3502},{"i":4690,"cid":"22DN0029","pid":"P00620217LZ","t":"Construction of Flood Control Structure, Sitio Binayoyo (Downstream) Phase II, Brgy. Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":55033758.16,"abc":55033950.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-27","lat":14.65886,"lon":121.23157,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calawis","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[4603,4642,4653,4778,4800,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":26,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":841},{"i":4691,"cid":"24OB0040","pid":"P00824794LZ","t":"Construction of Flood Mitigation Structure Barangay Malanday, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"BELL CONSTRUCTION","c":66132277.62,"abc":67549147.08,"fy":"2024","sd":"04/04/2024","cd":"2024-12-13","lat":14.640403,"lon":121.092397,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malanday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3503},{"i":4692,"cid":"22OB0312","pid":"P00620003LZ","t":"Bank Improvement / Protection Along Pateros River (Phase XIII), Brgy. Ususan, Pateros, Metro Manila","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":68719487.97,"abc":72374394.92,"fy":"2022","sd":"03/24/2022","cd":"2022-09-30","lat":14.535321,"lon":121.066096,"sm":1521,"fm":1521,"tm":1112,"am":1521,"md":0.0,"ls":"inside","ww":"Pateros","wn":"Pateros River","wd":0.0,"wp":[14.53533,121.06609],"wst":"matched","br":"Ususan","len":null,"ph":"Phase XIII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3504},{"i":4693,"cid":"23PC0032","pid":"P00726400LZ","t":"Construction of Apayao-Abulug River Basin Flood Control Structure, San Sebastian Section, Sta. 28 + 085 - Sta. 28 + 635 (R/S), Luna, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"LUNA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ISNAG BUILDERS & DEV'T. CORPORATION / TAGEL CORPORATION","c":96493463.88,"abc":96500000.0,"fy":"2023","sd":"05/05/2023","cd":"2024-03-20","lat":18.26714,"lon":121.40174,"sm":830,"fm":830,"tm":830,"am":830,"md":0.0,"ls":"inside","ww":"Apayao-Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":550.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3505},{"i":4694,"cid":"23DN0024","pid":"P00726253LZ","t":"Construction of Flood Control Structure along Marikina Victoria Valley, Barangay San Isidro, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"LTDL BUILDERS","c":31359995.0,"abc":31360000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-11-13","lat":14.590232,"lon":121.181218,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3506},{"i":4695,"cid":"24DC0120","pid":"P00823556LZ","t":"Construction of Flood Mitigation Structures along San Juan River, Tanauan- Santo Tomas, Batangas (Phase 6)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":96499092.75,"abc":96500000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-11-08","lat":14.090774,"lon":121.149935,"sm":1419,"fm":1419,"tm":180,"am":429,"md":0.02,"ls":"boundary","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.09078,121.1499],"wst":"matched","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.97,"text":"The record contradicts itself: the municipality field and the pin point to Santo Tomas, Batangas, but the title names Batangas City, Batangas, 28 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":454},{"i":4696,"cid":"24BJ0004","pid":"P00820787LZ","t":"Construction of Surong Centro CIS Flood Protection Works Along Tubo River, Kasibu, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"KASIBU (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":37553841.26,"abc":37567320.0,"fy":"2024","sd":"02/08/2024","cd":"2024-08-14","lat":16.319167,"lon":121.296667,"sm":701,"fm":701,"tm":701,"am":701,"md":0.0,"ls":"inside","ww":"Works Along Tubo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3507},{"i":4697,"cid":"21EI0157","pid":"P00526458LZ","t":"Construction of Bansud River Control, Conrazon Section, Bansud, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Bansud","deo":"Southern Mindoro District Engineering Office","co":"GREEN ISLAND ENTERPRISES","c":19599916.63,"abc":19599570.67,"fy":"2021","sd":"04/08/2022","cd":"2022-08-12","lat":12.867222,"lon":121.402222,"sm":156,"fm":null,"tm":156,"am":156,"md":0.0,"ls":"inside","ww":"Bansud","wn":"Bansud","wd":0.14,"wp":[12.86831,121.40291],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3508},{"i":4698,"cid":"21OF0193","pid":"P00561443LZ","t":"Construction of Flood Control Structures at Barangay Bagong Silangan, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"PRECIOUS CONSTRUCTION / DARCY & ANNA BUILDERS & TRADING","c":94973033.0,"abc":98000000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-12-01","lat":14.726026,"lon":121.066477,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Silangan","len":null,"ph":null,"dup":[4705,4710],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 142,990,791.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":770},{"i":4699,"cid":"23DE0023","pid":"P00726548LZ","t":"Construction of Flood Control Structures along Lobo River, Nagtaluntong, Lobo, Batangas (Section 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-12-15","lat":13.660986,"lon":121.232173,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":"Lobo","wn":"Lobo River","wd":0.13,"wp":[13.66017,121.23303],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3509},{"i":4700,"cid":"22DN0020","pid":"P00620627LZ","t":"Construction of Flood Control Structure of Creek/Canal Corville Subdivision, Brgy. San Luis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC.","c":9454403.7,"abc":9800000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-20","lat":14.59962,"lon":121.181605,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3510},{"i":4701,"cid":"24ED0047","pid":"P00824749LZ","t":"Construction of San Narciso Drainage Structure, Victoria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"NORTHERN SAMAR","mu":"VICTORIA (NORTHERN SAMAR)","deo":"Mindoro Oriental District Engineering Office","co":"KINGSROAD CONSTRUCTION","c":3184912.74,"abc":3217500.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-06","lat":13.191389,"lon":121.2975,"sm":1629,"fm":1628,"tm":1629,"am":1629,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":19,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":333.72,"text":"The record contradicts itself: the title and the pin point to Victoria, Oriental Mindoro, but the municipality field names Victoria, Northern Samar, 334 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":636},{"i":4702,"cid":"22DN0076","pid":"P00632909LZ","t":"Construction of Flood Control Structure at Angono River, Angono, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"ANGONO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"DJL ROBLES BUILDERS","c":9900000.0,"abc":9900000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-10-05","lat":14.524139,"lon":121.150057,"sm":62,"fm":62,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":"Angono","wn":"Angono River","wd":0.0,"wp":[14.5241,121.15005],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3511},{"i":4703,"cid":"24EI0021","pid":"P00821366LZ","t":"Construction of Pula River Control, Sta. 9+070 - Sta. 9+490, (Upstream - Left Side), Barangay Pambisan Malaki, Pinamalayan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PINAMALAYAN (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":67547027.84,"abc":67550000.0,"fy":"2024","sd":"02/15/2024","cd":"2025-01-31","lat":13.006667,"lon":121.402222,"sm":1140,"fm":1140,"tm":1140,"am":1140,"md":0.0,"ls":"inside","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pambisan Malaki","len":420.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3512},{"i":4704,"cid":"24OB0253","pid":"P00838333LZ","t":"Construction of Slope Protection along Tumana Creek, Brgy. Tumana, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":94530664.34,"abc":96499466.53,"fy":"2024","sd":"04/01/2024","cd":"2025-02-13","lat":14.653143,"lon":121.092573,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Tumana","wn":"Tumana Creek","wd":0.31,"wp":[14.65403,121.09532],"wst":"matched","br":"Tumana","len":null,"ph":null,"dup":[4716,4724],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 198,457,329.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":559},{"i":4705,"cid":"21OF0232","pid":"P00561158LZ","t":"Rehabilitation of Drainage, Balayan St., Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"Quezon City","deo":"Quezon City 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":28417758.0,"abc":29399750.0,"fy":"2021","sd":"02/16/2022","cd":"2022-10-31","lat":14.726026,"lon":121.066477,"sm":1191,"fm":null,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[4698,4710],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 142,990,791.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":999},{"i":4706,"cid":"24BC0084","pid":"P00823333LZ","t":"Construction of Sanchez Mira Flood Control Structure along Sanchez Mira River, Sanchez Mira, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANCHEZ-MIRA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":48248286.07,"abc":48250000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-09-06","lat":18.555533,"lon":121.232369,"sm":1365,"fm":1365,"tm":1365,"am":1365,"md":0.0,"ls":"inside","ww":"Sanchez Mira","wn":"Sanchez Mira River","wd":0.4,"wp":[18.55564,121.23613],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3513},{"i":4707,"cid":"23DD0105","pid":"P00742400LZ","t":"Construction of Box Culvert in Brgy. Tulos, Rosario, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"ROSARIO (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-08-28","lat":13.73507,"lon":121.29964,"sm":1217,"fm":1217,"tm":1217,"am":1217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tulos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3514},{"i":4708,"cid":"22PK0007","pid":"P00620487LZ","t":"Construction of Mataliling Flood Control Structure, Sta. 181+310 - Sta. 181+410 (L.S.), Upper Uma, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"SONBLESSED CONSTRUCTION AND SUPPLY","c":4467751.53,"abc":4900000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-09-23","lat":17.35492,"lon":121.15033,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3515},{"i":4709,"cid":"24DD0051","pid":"P00820320LZ","t":"Construction of Flood Mitigation Structure, Mabalanoy Bridge, San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION / YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-13","lat":13.813326,"lon":121.402273,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3516},{"i":4710,"cid":"22OF0057","pid":"P00631048LZ","t":"Rehabilitation of Flood Control Structure along Regalado Highway, Quezon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"CG GENERAL CONSTRUCTION & DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-10-10","lat":14.726026,"lon":121.066477,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[4698,4705],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":2,"text":"2 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 142,990,791.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1128},{"i":4711,"cid":"22DI0038","pid":"P00620246LZ","t":"Construction of River Protection Structure near Anos Bridge, (Upstream), Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":86847784.09,"abc":86850000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-23","lat":14.18069,"lon":121.23273,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3517},{"i":4712,"cid":"23DI0037","pid":"P00726228LZ","t":"Construction of Revetment along San Juan River, Barangay Sampiruhan, Calamba City, Laguna","w":"Construction of Revetment","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"E.R. VENZON CONSTRUCTION","c":42953626.0,"abc":44100000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-11-29","lat":14.223469,"lon":121.181647,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.22368,121.18145],"wst":"matched","br":"Sampiruhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3518},{"i":4713,"cid":"23DO0088","pid":"P00737542LZ","t":"Construction of Flood Control Structure along Upper Marikina, Barangay San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"EL-JAKE BUILDERS","c":20056331.71,"abc":24750000.0,"fy":"2023","sd":"07/18/2023","cd":"2024-03-15","lat":14.737434,"lon":121.150335,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[4336,4567,4681,4755,4781,4788,4814,4821,4850,4852,4885],"L":"field","s":20,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1057},{"i":4714,"cid":"23PJ0013","pid":"P00736180LZ","t":"Construction of Slope Protection Structure, DPWH Ifugao 2nd DEO, Talite, Aguinaldo, Ifugao","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"BENGUET","mu":"BAGUIO CITY (BENGUET)","deo":"Ifugao 2nd District Engineering Office","co":"JLY CONSTRUCTION","c":19600000.0,"abc":19557230.5,"fy":"2023","sd":"05/08/2023","cd":"2023-09-20","lat":16.99428,"lon":121.29976,"sm":12,"fm":110,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":95.03,"text":"The record contradicts itself: the title and the pin point to Aguinaldo, Ifugao, but the municipality field names Baguio City, Benguet, 95 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":608},{"i":4715,"cid":"23DH0059","pid":"P00742431LZ","t":"Construction of Drainage System at Brgy. Calios, Santa Cruz, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"DATZLAV CONSTRUCTION","c":4909938.35,"abc":4950000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-08-04","lat":14.284381,"lon":121.403172,"sm":1376,"fm":1376,"tm":1376,"am":1376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calios","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3519},{"i":4716,"cid":"24OB0327","pid":"P00823234LZ","t":"Improvement of Marikina River, Barangay Tumana, Marikina City (Phase 1)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94376471.21,"abc":96499459.32,"fy":"2024","sd":"03/22/2024","cd":"2024-09-16","lat":14.653143,"lon":121.092573,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.04,"wp":[14.65277,121.09269],"wst":"matched","br":"Tumana","len":null,"ph":"Phase 1","dup":[4704,4724],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 198,457,329.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":560},{"i":4717,"cid":"23DE0004","pid":"P00737491LZ","t":"Construction of Drainage with Curb and Gutter, Barangay Kumintang Ibaba, Batangas City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"BERTO LUCCI BUILDERS & SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-04-26","lat":13.76465,"lon":121.066558,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kumintang Ibaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3520},{"i":4718,"cid":"22ED0012","pid":"P00621113LZ","t":"Construction of Mag- Asawang Tubig River Control along Brgy. San Carlos, Sta. 0+000 - Sta. 0+248.000, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ETVR TRADING & CONSTRUCTION","c":48096753.28,"abc":49000000.0,"fy":"2022","sd":"07/14/2022","cd":"2023-03-27","lat":13.23139,"lon":121.2333,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-Asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.09,"wp":[13.23216,121.23306],"wst":"matched","br":"San Carlos","len":248.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3521},{"i":4719,"cid":"24E00039","pid":"P00820422LZ","t":"Construction of Road Dike along Mag-asawang Tubig River, Sitio Dike, Barangay Apitong Section, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":192996270.3,"abc":193000000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-08-15","lat":13.248846,"lon":121.18183,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":3.86,"wp":[13.22435,121.20714],"wst":"matched","br":"Apitong Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":3.86,"text":"The title names Mag-asawang Tubig, which OpenStreetMap maps through the stated municipality, but the pin is 3.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":274},{"i":4720,"cid":"24CF0020","pid":"P00821586LZ","t":"Construction of Flood Control Structure (Gabion) at Pampanga River, Barangay Bugnan, Gabaldon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GABALDON (BITULOK & SABANI) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":48019833.25,"abc":48999939.83,"fy":"2024","sd":"02/12/2024","cd":"2024-05-24","lat":15.469786,"lon":121.301475,"sm":559,"fm":559,"tm":559,"am":559,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":23.08,"wp":[15.5945,121.12902],"wst":"matched","br":"Bugnan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3522},{"i":4721,"cid":"23OB0134","pid":"P00725522LZ","t":"Construction of Slope Protection along Laguna Lakeshore (Package 6), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION / HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION","c":71706857.32,"abc":75520650.16,"fy":"2023","sd":"03/15/2023","cd":"2023-08-15","lat":14.501326,"lon":121.066573,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3523},{"i":4722,"cid":"21ED0083","pid":"P00526454LZ","t":"Construction of Mag-Asawang Tubig River Control along Brgy. San Carlos, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Naujan","deo":"Mindoro Oriental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":29399930.62,"abc":29400000.0,"fy":"2021","sd":"03/07/2022","cd":"2022-09-30","lat":13.23138,"lon":121.23333,"sm":1017,"fm":null,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-Asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.09,"wp":[13.23217,121.23308],"wst":"matched","br":"San Carlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3524},{"i":4723,"cid":"23DD0037","pid":"P00726207LZ","t":"Construction of Flood Control Structure, Paninsingin Bridge, Rosario, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"ROSARIO (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"TONIJON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: TONIJON CONSTRUCTION)","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-29","lat":13.83905,"lon":121.18225,"sm":1217,"fm":1217,"tm":1217,"am":1217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3525},{"i":4724,"cid":"24OB0331","pid":"P00825203LZ","t":"Improvement works along Marikina River, Second District, Marikina City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":9550193.0,"abc":9799969.95,"fy":"2024","sd":"04/08/2024","cd":"2024-05-07","lat":14.653143,"lon":121.092573,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.04,"wp":[14.65277,121.09269],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4704,4716],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 198,457,329.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":881},{"i":4725,"cid":"22CF0082","pid":"P00620192LZ","t":"Rehabilitation of Digmala River Control, Brgy. Tugatog, Bongabon, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"BONGABON (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION)","c":82025000.0,"abc":82024956.02,"fy":"2022","sd":"02/24/2022","cd":"2022-07-29","lat":15.651621,"lon":121.151092,"sm":222,"fm":222,"tm":222,"am":222,"md":0.0,"ls":"inside","ww":"Digmala","wn":"Digmala River","wd":2.07,"wp":[15.6618,121.13493],"wst":"matched","br":"Tugatog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3526},{"i":4726,"cid":"24CN0079","pid":"P00838523LZ","t":"Construction of Flood Control Structure, Cabulao Creek, Brgy. Paltic, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":31362500.0,"abc":31850000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-11-11","lat":15.384979,"lon":121.403751,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":"Cabulao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Paltic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3527},{"i":4727,"cid":"23BI0014","pid":"P00727120LZ","t":"Construction of Nalubbunan Flood Control along Magat River, Quezon, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"QUEZON (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"R.O. BUILDERS & DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-10-21","lat":16.511094,"lon":121.233518,"sm":1186,"fm":1186,"tm":1186,"am":1186,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.13,"wp":[16.51149,121.23233],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3528},{"i":4728,"cid":"23CF0042","pid":"P00725726LZ","t":"Construction of Flood Control Structure (Gabion) at Pampanga River, Barangay Bugnan, Gabaldon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"GABALDON (BITULOK & SABANI) (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":88397389.39,"abc":90227416.41,"fy":"2023","sd":"02/16/2023","cd":"2023-05-24","lat":15.47102,"lon":121.3017,"sm":559,"fm":559,"tm":559,"am":559,"md":0.0,"ls":"inside","ww":"Pampanga","wn":"Pampanga River","wd":23.02,"wp":[15.5945,121.12902],"wst":"matched","br":"Bugnan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3529},{"i":4729,"cid":"22OB0100","pid":"P00620047LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 2, Taguig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC.","c":96500000.0,"abc":96499365.4,"fy":"2022","sd":"02/16/2022","cd":"2022-07-27","lat":14.533782,"lon":121.06675,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.01,"wp":[14.53367,121.06676],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[4037,4039,4862,4000,4016,4066,4077,4031,4033],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":215},{"i":4730,"cid":"23ED0031","pid":"P00727187LZ","t":"Construction of Bucayao Flood Control Structure along Barangay Camansihan Section 1 Sta. 0 + 000 - Sta. 0 + 060, Section 2 Sta. 0 + 000 to Sta. 0 + 107.86, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":38594287.32,"abc":38600000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-07-26","lat":13.35086,"lon":121.2336,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camansihan Section 1 Sta. 0 + 000","len":167.9,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3530},{"i":4731,"cid":"23DN0067","pid":"P00726241LZ","t":"Construction of Flood Control Structure, Sitio Libis Creek, Barangay San Jose, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"BELL CONSTRUCTION","c":48999253.95,"abc":49000000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-12-08","lat":14.693026,"lon":121.301778,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Sitio Libis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[4373,4544,4550,4571,4609,4630,4635,4738,4851],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1026},{"i":4732,"cid":"24DD0154","pid":"P00844772LZ","t":"Rehabilitation of Drainage System at Barangay Adya, Lipa City, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"ALBANO CONSTRUCTION AND TRADING","c":6178418.88,"abc":6370000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-08-10","lat":13.87802,"lon":121.18283,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Adya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3531},{"i":4733,"cid":"23DI0117","pid":"P00740386LZ","t":"Construction of Structure for River Protection Along Malitlit Waterways, (Near Eton Road), Sta. Rosa City, Laguna Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"LE BRON CONSTRUCTION","c":96427776.33,"abc":96500000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-12-12","lat":14.256883,"lon":121.092583,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3532},{"i":4734,"cid":"22BI0046","pid":"P00621481LZ","t":"Rehabilitation of Flood Control and Drainage Structures along Magat River, Vista Alegre Section (Phase 5), Sta. 0 + 363.85 - Sta. 0 + 413.85, Sta. 0 + 593.85 - Sta. 0 + 893.85, Bayombong, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"G.M. PAJARILLAGA CONSTRUCTION & SUPPLY","c":28950000.0,"abc":28950000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-09-30","lat":16.474005,"lon":121.151761,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.02,"wp":[16.47386,121.15174],"wst":"matched","br":null,"len":350.0,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3533},{"i":4735,"cid":"24DP0119","pid":"P00820907LZ","t":"Construction of Sta. Cruz RIS Water Management Flood Control Project of Lapad River, Liliw, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LILIW (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"L.P.O. ENTERPRISES","c":19599999.52,"abc":19600000.0,"fy":"2024","sd":"07/15/2024","cd":"2025-01-10","lat":14.203204,"lon":121.405694,"sm":789,"fm":789,"tm":789,"am":789,"md":0.0,"ls":"inside","ww":"Lapad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3534},{"i":4736,"cid":"24CD0079","pid":"P00820184LZ","t":"Construction of Dike along Santo Cristo River, Barangay Santo Cristo, San Jose del Monte City, Bulacan","w":"Construction of Dike","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96498484.3,"abc":96499675.66,"fy":"2024","sd":"02/26/2024","cd":"2024-10-04","lat":14.830035,"lon":121.066838,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Santo Cristo","wn":"Santo Cristo Creek","wd":19.74,"wp":[14.65788,121.01883],"wst":"matched","br":"Santo Cristo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3535},{"i":4737,"cid":"24ED0019","pid":"P00821603LZ","t":"Construction of Bucayao River Control along Barangay Camansihan, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MINDALIFI CONSTRUCTION AND SUPPLY","c":48999817.77,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-08","lat":13.352778,"lon":121.234444,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.13,"wp":[13.35237,121.23555],"wst":"matched","br":"Camansihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3536},{"i":4738,"cid":"22DN0019","pid":"P00620621LZ","t":"Construction of Box Culvert with Approaches/Slope Protection, Sitio Libis, Brgy. San Jose, Antipolo City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":14052374.28,"abc":14700000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-13","lat":14.69215,"lon":121.30445,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[4373,4544,4550,4571,4609,4630,4635,4731,4851],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1103},{"i":4739,"cid":"22ED0142","pid":"P00639526LZ","t":"Construction of Various Drainage, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"FRAMECON BUILDERS","c":43119999.53,"abc":43120000.0,"fy":"2022","sd":"07/14/2022","cd":"2023-03-08","lat":13.41389,"lon":121.1836,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3537},{"i":4740,"cid":"21EI0151","pid":"P00561581LZ","t":"Construction of Manaul II River Control, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Mansalay","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":19599928.35,"abc":19798667.11,"fy":"2021","sd":"04/08/2022","cd":"2022-11-23","lat":12.443611,"lon":121.406111,"sm":923,"fm":null,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Manaul II","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3538},{"i":4741,"cid":"23DC0094","pid":"P00725767LZ","t":"Construction of Flood Mitigation Structures along San Juan River - Phase 4, Tanauan - Sto Tomas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"LOUREL DEVELOPMENT CORPORATION (FORMERLY :LOUREL D","c":96499879.0,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-05-09","lat":14.087585,"lon":121.152717,"sm":1419,"fm":1419,"tm":180,"am":429,"md":0.01,"ls":"boundary","ww":"San Juan","wn":"San Juan River","wd":0.03,"wp":[14.08765,121.15247],"wst":"matched","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[4803,4809],"cl":[],"L":"records","s":57,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.68,"text":"The record contradicts itself: the municipality field and the pin point to Santo Tomas, Batangas, but the title names Batangas City, Batangas, 28 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DC0093 to 23DC0095) cover the same site, together worth PHP 291,999,142.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":127},{"i":4742,"cid":"23PC0040","pid":"P00735964LZ","t":"Construction of Flood Control Structure along Apayao River Basin, Barangay San Sebastian, Luna, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"LUNA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/25/2023","cd":"2024-07-10","lat":18.27045,"lon":121.406353,"sm":830,"fm":830,"tm":830,"am":830,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":15.45,"wp":[18.13691,121.36364],"wst":"matched","br":"San Sebastian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3539},{"i":4743,"cid":"22OB0074","pid":"P00620366LZ","t":"Maintenance and Rehabilitation of Flood Control Structure along Manggahan Floodway, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"MSB VITUG CONSTRUCTION","c":46499760.0,"abc":48999676.09,"fy":"2022","sd":"03/17/2022","cd":"2022-10-12","lat":14.590259,"lon":121.092739,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.01,"wp":[14.59025,121.09269],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3540},{"i":4744,"cid":"24CD0170","pid":"P00844752LZ","t":"Construction of Slope Protection Structure, Area A, San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO","c":48994885.36,"abc":48999165.16,"fy":"2024","sd":"04/30/2024","cd":"2024-11-04","lat":14.846029,"lon":121.067051,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3541},{"i":4745,"cid":"24ED0017","pid":"P00821607LZ","t":"Construction of Mag-asawang Tubig River Control along Barangay San Carlos, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"CEFF TRADING & ENGINEERING SERVICES","c":48999940.58,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-27","lat":13.233333,"lon":121.234722,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.04,"wp":[13.23352,121.23442],"wst":"matched","br":"San Carlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3542},{"i":4746,"cid":"22DO0037","pid":"P00620210LZ","t":"Construction of Flood Control and River Bank Protection Structure Along Pililla River, Brgy. Hulo, Pililla, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"PILILLA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"DOUBLE 12 CONSTRUCTION & SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-12-02","lat":14.4925,"lon":121.305,"sm":1138,"fm":1138,"tm":1138,"am":1138,"md":0.0,"ls":"inside","ww":"Pililla","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Hulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3543},{"i":4747,"cid":"22DI0023","pid":"P00620890LZ","t":"Construction of River Protection Structure along San Cristobal River, (near Looc Bridge), Brgy. Looc, Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":80693065.75,"abc":83187825.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-15","lat":14.22981,"lon":121.18397,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.08,"wp":[14.22916,121.1842],"wst":"matched","br":"Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3544},{"i":4748,"cid":"24PK0033","pid":"P00821557LZ","t":"Construction of Ngilin Flood Control along Chico River, Sta. 186+670 - Sta. 186+810 (R.S.), Ambato-Legleg, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"MA BUYAGAN CONSTRUCTION SERVICES","c":11747921.15,"abc":11760000.0,"fy":"2024","sd":"04/04/2024","cd":"2025-02-24","lat":17.26939,"lon":121.1536,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.26928,121.15382],"wst":"matched","br":null,"len":140.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3545},{"i":4749,"cid":"23OB0135","pid":"P00725523LZ","t":"Construction of Slope Protection along Laguna Lakeshore (Package 7), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION / HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION","c":71744360.96,"abc":75520379.96,"fy":"2023","sd":"03/15/2023","cd":"2023-08-15","lat":14.502683,"lon":121.0671,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3546},{"i":4750,"cid":"23OB0070","pid":"P00725950LZ","t":"Construction of Drainage System at Kalawaan Housing Project, Barangay Kalawaan and vicinity, Pasig City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":9308598.82,"abc":9799986.28,"fy":"2023","sd":"02/06/2023","cd":"2023-07-10","lat":14.549653,"lon":121.092798,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kalawaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3547},{"i":4751,"cid":"23EI0008","pid":"P00726771LZ","t":"Construction of Pula River Control Structure, Barangay Santa Maria Section, Pinamalayan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PINAMALAYAN (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":48997251.2,"abc":48999994.72,"fy":"2023","sd":"02/15/2023","cd":"2023-12-15","lat":13.024167,"lon":121.406389,"sm":1140,"fm":1140,"tm":1140,"am":1472,"md":0.07,"ls":"boundary","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Santa Maria Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3548},{"i":4752,"cid":"21DO0038","pid":"P00561551LZ","t":"Construction of for Slope Protection (Portion) of Pililia River, Sitio Libid, Barangay Hulo, Pililia, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":null,"deo":"Rizal 2nd District Engineering Office","co":"JCML BUILDERS","c":8173647.31,"abc":9900000.0,"fy":"2021","sd":"12/24/2021","cd":"2022-07-23","lat":14.491733,"lon":121.305321,"sm":null,"fm":null,"tm":null,"am":1138,"md":null,"ls":"unknown","ww":"Pililia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Hulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":130},{"i":4753,"cid":"23ED0034","pid":"P00727191LZ","t":"Construction of Maidlang River Control, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"E E CONSTRUCTION","c":33774891.8,"abc":33775000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-09-20","lat":13.38611,"lon":121.2353,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Maidlang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3549},{"i":4754,"cid":"22DI0030","pid":"P00621098LZ","t":"Construction of River Protection Structure along San Cristobal River, (Downstream), Brgy. Looc, Calamba City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"R.D. SADSAD CONSTRUCTION & TRADING","c":39196546.74,"abc":39200000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-07-11","lat":14.22864,"lon":121.18438,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":"San Cristobal","wn":"San Cristobal River","wd":0.06,"wp":[14.22916,121.18419],"wst":"matched","br":"Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3550},{"i":4755,"cid":"22DO0046","pid":"P00630946LZ","t":"Construction of Flood Control Structures of Lukutang Malaki River (Tributary of Marikina River), Phase I, Sitio Anginan, Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":65620000.0,"abc":65620000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-08-22","lat":14.760833,"lon":121.154167,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase I","dup":[],"run":[4781,4814,4850,4788,4821],"cl":[4336,4567,4681,4713,4781,4788,4814,4821,4850,4852,4885],"L":"field","s":51,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":97},{"i":4756,"cid":"21OD0189","pid":"P00525796LZ","t":"Construction/Rehabilitation of Flood Control Wall along Bank of Creeks in Barangay 178, 185, 186, 187, 188, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"Caloocan City","deo":"Metro Manila 3rd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":28663271.48,"abc":29398246.97,"fy":"2021","sd":"03/24/2022","cd":"2022-11-14","lat":14.758071,"lon":121.067102,"sm":308,"fm":null,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"178","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3551},{"i":4757,"cid":"22OB0160","pid":"P00620072LZ","t":"Construction of Slope Protection at Labasan Pumping Station Retarding Pond, Taguig City (Package 5)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":89727299.48,"abc":94569981.84,"fy":"2022","sd":"02/16/2022","cd":"2022-09-07","lat":14.529045,"lon":121.092839,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3552},{"i":4758,"cid":"21DO0062","pid":"P00561572LZ","t":"Rehabilitation of  Slope Protection at Pililia River (near M.L. Quezon St.), Barangay Hulo, Pililia, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":null,"deo":"Rizal 2nd District Engineering Office","co":"ANROL CONSTRUCTION","c":4776540.5,"abc":4950000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-16","lat":14.487857,"lon":121.306307,"sm":null,"fm":null,"tm":null,"am":1138,"md":null,"ls":"unknown","ww":"Pililia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Hulo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":131},{"i":4759,"cid":"23ED0033","pid":"P00727190LZ","t":"Construction of Flood Control Structure along Sitio Bagong Pook, Barangay Gutad, Sta. 0 + 000 - Sta. 0 + 182.49, Calapan City, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":33774992.74,"abc":33775000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-10-22","lat":13.34833,"lon":121.2356,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gutad","len":182.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3553},{"i":4760,"cid":"21DO0050","pid":"P00561565LZ","t":"Construction of Slope Protection at Mascap River, Sitio Mascap Proper, Barangay Mascap, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":28655605.84,"abc":29700000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-18","lat":14.7618,"lon":121.1847,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Mascap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mascap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3554},{"i":4761,"cid":"23DI0050","pid":"P00737518LZ","t":"Rehabilitation of Drainage at Barangay Parian, Calamba City, Laguna","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF CALAMBA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"PASCAL CONSTRUCTION","c":12817753.43,"abc":12870000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-09-30","lat":14.2115,"lon":121.1545,"sm":376,"fm":376,"tm":376,"am":376,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Parian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3555},{"i":4762,"cid":"23PL0020","pid":"P00736182LZ","t":"Construction of Aciga Flood Control Structure, Pinukpuk, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PINUKPUK (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"JTM CONSTRUCTION","c":48921766.56,"abc":48976965.5,"fy":"2023","sd":"02/20/2023","cd":"2024-01-25","lat":17.60742,"lon":121.307,"sm":1145,"fm":1145,"tm":1145,"am":1145,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3556},{"i":4763,"cid":"23EI0036","pid":"P00742466LZ","t":"Construction of Mapang Flood Control at Brgy. Mapang, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. ALMERO ENTERPRISES","c":4949055.62,"abc":4949956.3,"fy":"2023","sd":"03/24/2023","cd":"2023-06-23","lat":12.67415,"lon":121.408278,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mapang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3557},{"i":4764,"cid":"23OB0409","pid":"P00727231LZ","t":"Improvement Works Along Upper Marikina River at Sta. 15 + 700 to Sta. 15 + 850, Right Bank, Marikina City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":93089846.79,"abc":97999570.03,"fy":"2023","sd":"09/25/2023","cd":"2024-03-09","lat":14.65291,"lon":121.09321,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Works Along Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3558},{"i":4765,"cid":"22OB0092","pid":"P00620015LZ","t":"Construction / Improvement of Roads and Drainage System Along Bagong Calzada St. Pateros Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":68719494.97,"abc":72374706.3,"fy":"2022","sd":"02/16/2022","cd":"2022-09-13","lat":14.540827,"lon":121.067197,"sm":1521,"fm":1521,"tm":null,"am":1112,"md":0.3,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3559},{"i":4766,"cid":"24ED0058","pid":"P00821609LZ","t":"Construction of Seawall, Sitio Villa Antonio, Navotas, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"JARO BUILDERS & CONSTRUCTION SUPPLY","c":19599848.4,"abc":19600000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-22","lat":13.386053,"lon":121.235618,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3560},{"i":4767,"cid":"23DN0044","pid":"P00737529LZ","t":"Construction of Flood Control Structure of Creek/Canal Corville Subdivision Phase 2, Barangay San Luis Antipolo City, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"TOP KMC CONSTRUCTION AND SUPPLY CORP.","c":9899999.99,"abc":9900000.0,"fy":"2023","sd":"03/09/2023","cd":"2024-04-25","lat":14.597915,"lon":121.184894,"sm":365,"fm":365,"tm":null,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Luis Antipolo City","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3561},{"i":4768,"cid":"21PK0020","pid":"P00525925LZ","t":"Construction of Dun-ol Sangab Flood Control along Pasil River Sta.175+270 - Sta 175+630 (L.S.), Amdalao, Guina-ang, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"BLESSING BUILDERS AND CONSTRUCTION SUPPLY","c":19939080.0,"abc":19939080.0,"fy":"2021","sd":"04/10/2022","cd":"2023-01-23","lat":17.387021,"lon":121.154583,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":"Pasil","wn":"Pasil River","wd":0.13,"wp":[17.38614,121.15541],"wst":"matched","br":null,"len":360.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3562},{"i":4769,"cid":"22CN0035","pid":"P00630934LZ","t":"Construction of Flood Control Facility, Brgy. Umiray, Dingalan, Aurora","w":"Construction of Flood Mitigation Facility","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":91283210.0,"abc":91283210.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-22","lat":15.213196,"lon":121.408319,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Umiray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3563},{"i":4770,"cid":"23OF0058","pid":"P00726015LZ","t":"Construction of Flood Control Structure and Tributaries at Barangay Batasan-Commonwealth, Quezon City (Phase 7)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES) / A. DELA CRUZ BUILDERS INC.","c":48509688.15,"abc":48999685.0,"fy":"2023","sd":"02/27/2023","cd":"2023-12-22","lat":14.691405,"lon":121.093236,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batasan-Commonwealth","len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3564},{"i":4771,"cid":"22OC0019","pid":"P00620367LZ","t":"Construction of Revetment Wall along Makati-Pateros River (Phase III), Brgy. Comembo, Makati City","w":"Construction of Revetment","rg":"National Capital Region","pv":"MAKATI CITY","mu":"CITY OF MAKATI (METROPOLITAN MANILA)","deo":"Metro Manila 2nd District Engineering Office","co":"TWO DIMENSION CONSTRUCTION / RJM CONSTRUCTION AND DEV'T., INC.","c":37548700.0,"abc":37548700.0,"fy":"2022","sd":"02/04/2022","cd":"2022-08-01","lat":14.549619,"lon":121.067356,"sm":398,"fm":398,"tm":398,"am":1112,"md":0.01,"ls":"boundary","ww":"Makati-Pateros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Comembo","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3565},{"i":4772,"cid":"24ED0056","pid":"P00821608LZ","t":"Construction of River Control along Sitio Bagong Pook, Barangay Gutad, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"E E CONSTRUCTION","c":48999745.31,"abc":49000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-24","lat":13.347222,"lon":121.236667,"sm":377,"fm":377,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gutad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3566},{"i":4773,"cid":"23CF0092","pid":"P00725728LZ","t":"Construction of Flood Control Structure (Gabion) along Digmala River, Barangay Ariendo, Bongabon, Nueva Ecija","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"BONGABON (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"CELSO C. FERRER  CONSTRUCTION CORP.","c":88777708.23,"abc":90227423.45,"fy":"2023","sd":"04/17/2023","cd":"2023-12-13","lat":15.662359,"lon":121.185065,"sm":222,"fm":222,"tm":222,"am":222,"md":0.0,"ls":"inside","ww":"Digmala","wn":"Digmala River","wd":4.89,"wp":[15.69125,121.15057],"wst":"matched","br":"Ariendo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.89,"text":"The title names Digmala, which OpenStreetMap maps through the stated municipality, but the pin is 4.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":300},{"i":4774,"cid":"21PB0013","pid":"P00526270LZ","t":"Construction of Nabuangan (Upstream) Flood Control, Sta. 38 + 997 - Sta. 39 + 447 (B/S), Brgy. Caglayan, Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Conner","deo":"Apayao 1st District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":80309010.27,"abc":82914680.0,"fy":"2021","sd":"12/22/2021","cd":"2023-04-14","lat":17.800278,"lon":121.308889,"sm":452,"fm":null,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caglayan","len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3567},{"i":4775,"cid":"22CF0033","pid":"P00620193LZ","t":"Rehabilitation of Digmala River, Brgy. Ariendo, Bongabon, Nueva Ecija","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region III","pv":"NUEVA ECIJA","mu":"BONGABON (NUEVA ECIJA)","deo":"Nueva Ecija 2nd District Engineering Office","co":"FRAMECON BUILDERS","c":82025000.0,"abc":82024995.54,"fy":"2022","sd":"03/02/2022","cd":"2022-12-29","lat":15.654029,"lon":121.154657,"sm":222,"fm":222,"tm":222,"am":222,"md":0.0,"ls":"inside","ww":"Digmala","wn":"Digmala River","wd":2.28,"wp":[15.6618,121.13493],"wst":"matched","br":"Ariendo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3568},{"i":4776,"cid":"22E00061","pid":"P00630954LZ","t":"Construction of Cagancan River Control, Barangay Don Pedro, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":144740430.5,"abc":144750000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-04-30","lat":12.481325,"lon":121.408355,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Cagancan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Don Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3569},{"i":4777,"cid":"24PK0058","pid":"P00845931LZ","t":"Construction of Flood Control Structures, Saltan, Biyog Creek, Batong Buhay NHS, Mataliling Kiloy, Mabilong in Barangay Balbalasang, Barangay Balatoc, Barangay Upper Uma, Barangay Mabilong, Balbalan, Pasil and Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PASIL (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"RAD CONSTRUCTION","c":6926724.62,"abc":6930000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-10-04","lat":17.3443,"lon":121.06753,"sm":1108,"fm":1108,"tm":125,"am":1108,"md":0.0,"ls":"inside","ww":"Biyog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balbalasang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":6.1,"text":"The record contradicts itself: the municipality field and the pin point to Pasil, Kalinga, but the title names Balbalan, Kalinga, 6 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":627},{"i":4778,"cid":"24DN0022","pid":"P00820943LZ","t":"Construction of Flood Control Structure, Calawis River (Downstream) Phase 3, Barangay Calawis, Antipolo City, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC.","c":48744682.77,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-10-21","lat":14.673131,"lon":121.236942,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[4603,4642,4653,4690,4800,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":923},{"i":4779,"cid":"24E00051","pid":"P00839489LZ","t":"Construction of Road Dike along Mag-asawang Tubig River, Dayapan Section, Barangay Sto. Niño, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"RAYMAN BUILDERS INC.,","c":247495045.0,"abc":247500000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-08-15","lat":13.251103,"lon":121.18526,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":3.79,"wp":[13.22435,121.20714],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.79,"text":"The title names Mag-asawang Tubig, which OpenStreetMap maps through the stated municipality, but the pin is 3.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":275},{"i":4780,"cid":"24E00038","pid":"P00820393LZ","t":"Construction of Flood Control Structure (Naujan Seawall), Baragay Estrella Section, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":202645832.5,"abc":202650000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-08-15","lat":13.334964,"lon":121.309458,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3570},{"i":4781,"cid":"22DO0043","pid":"P00637803LZ","t":"Construction of Flood Control Structures along Upper Marikina River (Phase I), Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"EL-JAKE BUILDERS","c":19800000.0,"abc":19800000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-05-11","lat":14.73775,"lon":121.15481,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase I","dup":[],"run":[4814,4850,4755,4788,4821],"cl":[4336,4567,4681,4713,4755,4788,4814,4821,4850,4852,4885],"L":"field","s":43,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":167},{"i":4782,"cid":"23DO0011","pid":"P00725833LZ","t":"Construction of Flood Control Structure along Pililla River (Sta. 4 + 658 - Sta. 4 + 972), Barangay Hulo, Pililla, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"PILILLA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"AARCON BUILDERS","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-22","lat":14.4971,"lon":121.312402,"sm":1138,"fm":1138,"tm":1138,"am":1138,"md":0.0,"ls":"inside","ww":"Pililla","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Hulo","len":314.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3571},{"i":4783,"cid":"22CN0182","pid":"P00637067LZ","t":"Construction of Flood Control Structures in Barangay Paltic, Dingalan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINGALAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"06/21/2022","cd":"2023-02-24","lat":15.3814,"lon":121.40866,"sm":515,"fm":515,"tm":515,"am":515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paltic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3572},{"i":4784,"cid":"22CD0207","pid":"P00637016LZ","t":"Construction of Slope Protection, Hulo-Kaban, Brgy. Kaypian, City of San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP.","c":96455909.0,"abc":96499037.84,"fy":"2022","sd":"05/26/2022","cd":"2023-07-03","lat":14.80718,"lon":121.06755,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaypian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3573},{"i":4785,"cid":"24DI0069","pid":"P00824726LZ","t":"Rehabilitation of River Protection Structure along Macabling, Santa Rosa City, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":48999622.78,"abc":49000000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-02","lat":14.296798,"lon":121.093253,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3574},{"i":4786,"cid":"22DN0128","pid":"P00639498LZ","t":"Construction of Slope Protection, Barangay Mahabang Parang (Package 2), Angono, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"ANGONO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":9308628.0,"abc":9800000.0,"fy":"2022","sd":"06/29/2022","cd":"2022-08-30","lat":14.54321,"lon":121.18563,"sm":62,"fm":62,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahabang Parang","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3575},{"i":4787,"cid":"22DE0018","pid":"P00631286LZ","t":"Construction of Flood Control Structure at Sitio Ilaya, Mabilog na Bundok, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-01-02","lat":13.6489,"lon":121.2372,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3576},{"i":4788,"cid":"22DO0047","pid":"P00630947LZ","t":"Construction of Flood Control Structures of Lukutang Malaki River (Tributary of Marikina River), Phase II, Sitio Anginan, Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":65620000.0,"abc":65620000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-08-22","lat":14.762324,"lon":121.154909,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase II","dup":[],"run":[4781,4814,4850,4755,4821],"cl":[4336,4567,4681,4713,4755,4781,4814,4821,4850,4852,4885],"L":"field","s":51,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":98},{"i":4789,"cid":"22DE0072","pid":"P00620208LZ","t":"Construction of Bank Protection/Flood Control Structure along Lobo-Malabrigo-Laiya-San Juan Road (Biga-Balibago Section, Phase I), Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-25","lat":13.62222,"lon":121.314167,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3577},{"i":4790,"cid":"22DH0080","pid":"P00644534LZ","t":"Repair/Rehabilitation/Improvement of River Control along Sta. Cruz River, Brgy Sto. Anghel Norte, Sta. Cruz, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"ISOBEL CONCRETE CONSTRUCTOR CORPORATION","c":23395522.14,"abc":24125000.0,"fy":"2022","sd":"11/22/2022","cd":"2023-08-18","lat":14.287731,"lon":121.408956,"sm":1376,"fm":1376,"tm":1376,"am":1376,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Anghel Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3578},{"i":4791,"cid":"24BI0050","pid":"P00843259LZ","t":"Construction of Flood Control and Drainage Structure along Matuno River, Manamtam Section, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":89745000.0,"abc":89745000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-05-31","lat":16.39287,"lon":121.06756,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Matuno","wn":"Matuno River","wd":0.07,"wp":[16.3923,121.06793],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3579},{"i":4792,"cid":"21PK0031","pid":"P00526386LZ","t":"Construction of Ambalbalan Flood Control along Chico River Sta. 175+350 - Sta. 175+410 (R.S), Mabongtot, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Lubuagan","deo":"Upper Kalinga District Engineering Office","co":"ROCKWELL BUILDERS","c":4519926.68,"abc":4900000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-11-16","lat":17.336825,"lon":121.188435,"sm":817,"fm":null,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.05,"wp":[17.33676,121.18798],"wst":"matched","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3580},{"i":4793,"cid":"22DC0052","pid":"P00620868LZ","t":"Construction of Flood Mitigation Structure along San Juan River, Tanauan - Sto. Tomas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION","c":77199364.24,"abc":77200000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-11-14","lat":14.084889,"lon":121.155023,"sm":1419,"fm":1419,"tm":180,"am":429,"md":0.02,"ls":"boundary","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.08484,121.15506],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.45,"text":"The record contradicts itself: the municipality field and the pin point to Santo Tomas, Batangas, but the title names Batangas City, Batangas, 27 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":475},{"i":4794,"cid":"21BI0047","pid":"P00561681LZ","t":"Repair/Rehabilitation/Improvement of Flood Control And Drainage Structure Along Magat River, Bangar Section 2, Brgy. Bangar, Solano, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Solano","deo":"Nueva Vizcaya District Engineering Office","co":"SHANLEY CONSTRUCTION","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-11-13","lat":16.53423,"lon":121.2374,"sm":1477,"fm":null,"tm":1477,"am":1477,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.02,"wp":[16.53415,121.23759],"wst":"matched","br":"Bangar","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3581},{"i":4795,"cid":"24DP0138","pid":"P00839633LZ","t":"Construction of Flood Control Structure, Barangay Soledad, San Pablo City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SAN PABLO CITY (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":4949518.07,"abc":4950000.0,"fy":"2024","sd":"08/09/2024","cd":"2024-11-06","lat":14.039588,"lon":121.315495,"sm":1346,"fm":1346,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Soledad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3582},{"i":4796,"cid":"22OG0006","pid":"P00632723LZ","t":"Rehabilitation of Drainage System at Barangay Amihan, Quezon City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"RWORKMATE CONSTRUCTION","c":4741678.03,"abc":4949633.23,"fy":"2022","sd":"02/09/2022","cd":"2022-09-28","lat":14.631563,"lon":121.067566,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Amihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3583},{"i":4797,"cid":"24PM0018","pid":"P00821547LZ","t":"Construction of Masablang Flood Control, Bantay, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"J.M. DAPING CONSTRUCTION SERVICES","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-16","lat":17.1698,"lon":121.40946,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3584},{"i":4798,"cid":"22CD0211","pid":"P00637070LZ","t":"Construction of Slope Protection Structure, Brgy. Kaybanban, City of San Jose del Monte, Bulacan","w":"Construction of Slope Protection Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":38611537.31,"abc":39199928.23,"fy":"2022","sd":"05/26/2022","cd":"2022-12-21","lat":14.81338,"lon":121.09334,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaybanban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3585},{"i":4799,"cid":"24E00050","pid":"P00839490LZ","t":"Construction of Road Dike aling Mag-asawang Tubig River, Sampaloc Section, Barangay Sto. Niño, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"RAYMAN BUILDERS INC.,","c":247496440.5,"abc":247500000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-08-15","lat":13.253384,"lon":121.188722,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":3.78,"wp":[13.2247,121.20769],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.78,"text":"The title names Mag-asawang Tubig, which OpenStreetMap maps through the stated municipality, but the pin is 3.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":276},{"i":4800,"cid":"23DN0008","pid":"P00726236LZ","t":"Construction of Flood Control Structure, Calawis River (Downstream) Phase 2, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC. / GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48999164.58,"abc":49000000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-08-25","lat":14.669262,"lon":121.237526,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[4603,4642,4653,4690,4778,4816,4827,4834,4841,4864,4890,4908],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":882},{"i":4801,"cid":"21PB0004","pid":"P00526367LZ","t":"Construction of Nabuangan River (Upstream) Flood Control, Sta. 37 + 807 - Sta. 38 + 267 (L/S), Sitio Paddig, Brgy. Caglayan, Conner, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Conner","deo":"Apayao 1st District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":38292917.46,"abc":39199819.73,"fy":"2021","sd":"12/02/2021","cd":"2022-09-24","lat":17.8,"lon":121.315833,"sm":452,"fm":null,"tm":452,"am":452,"md":0.0,"ls":"inside","ww":"Nabuangan","wn":"Nabbuangan River","wd":0.1,"wp":[17.80083,121.31606],"wst":"matched","br":"Caglayan","len":460.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":518},{"i":4802,"cid":"24EI0022","pid":"P00821611LZ","t":"Construction of River Control Structure along Cawacat River, Cambunang Section, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"MADSAM ENTERPRISES","c":29396724.81,"abc":29400000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-08-04","lat":12.367525,"lon":121.317106,"sm":249,"fm":249,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":"Cawacat","wn":"Cawacat River","wd":0.12,"wp":[12.3686,121.31712],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3586},{"i":4803,"cid":"23DC0093","pid":"P00726551LZ","t":"Construction of Flood Mitigation Structure along San Juan River, Tanauan - Sto. Tomas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF TANAUAN (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS / REVERE CONSTRUCTION & SUPPLY CORPORATION (FORMERLY","c":96499284.5,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-09-14","lat":14.083845,"lon":121.155277,"sm":429,"fm":429,"tm":180,"am":429,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.08381,121.15538],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4809],"run":[4741,4809],"cl":[],"L":"records","s":82,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.34,"text":"The record contradicts itself: the municipality field and the pin point to City of Tanauan, Batangas, but the title names Batangas City, Batangas, 27 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 195,499,264.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DC0093 to 23DC0095) cover the same site, together worth PHP 291,999,142.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":12},{"i":4804,"cid":"23BC0018","pid":"P00725669LZ","t":"Construction of Sanchez Mira Flood Control Structure along Sanchez Mira River, Sanchez Mira, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANCHEZ-MIRA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION / JEICCA BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-09-19","lat":18.55682,"lon":121.23841,"sm":1365,"fm":1365,"tm":1365,"am":1365,"md":0.0,"ls":"inside","ww":"Sanchez Mira","wn":"Sanchez Mira River","wd":0.03,"wp":[18.55699,121.23823],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3587},{"i":4805,"cid":"23OB0136","pid":"P00725524LZ","t":"Construction of Slope Protection along Laguna Lakeshore (Package 8), Taguig City","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION / DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":71675531.01,"abc":75463814.5,"fy":"2023","sd":"03/15/2023","cd":"2023-08-01","lat":14.503846,"lon":121.067635,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3588},{"i":4806,"cid":"23OB0099","pid":"P00725937LZ","t":"Rehabilitation of Flood Mitigation Structure, Parian Creek at Barangay Kapasigan, Sagad, Sto. Tomas, Palatiw, San Miguel and Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":14881389.09,"abc":15679504.33,"fy":"2023","sd":"02/06/2023","cd":"2023-05-06","lat":14.555177,"lon":121.093451,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Parian","wn":"Parian Creek","wd":0.0,"wp":[14.55516,121.09344],"wst":"matched","br":"Kapasigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3589},{"i":4807,"cid":"23DD0023","pid":"P00726206LZ","t":"Construction of Flood Control Structure, Pinagsibaan Bridge 2, Rosario, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"ROSARIO (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"TONIJON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: TONIJON CONSTRUCTION)","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-29","lat":13.83541,"lon":121.31999,"sm":1217,"fm":1217,"tm":1217,"am":1217,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3590},{"i":4808,"cid":"22EI0032","pid":"P00621123LZ","t":"Construction of Pula River Control, Brgy. Pagalagala Section, Sta. 0+000 - Sta. 0+480 and Sta. 0+000 - Sta. 0+086, Pinamalayan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PINAMALAYAN (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"E E CONSTRUCTION / SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":48999413.41,"abc":48999227.91,"fy":"2022","sd":"06/03/2022","cd":"2022-12-27","lat":13.036111,"lon":121.41,"sm":1140,"fm":1140,"tm":1140,"am":1140,"md":0.0,"ls":"inside","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pagalagala Section","len":566.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":455},{"i":4809,"cid":"23DC0095","pid":"P00742396LZ","t":"Construction of Flood Mitigation Structures Along San Juan River - Phase 5, Tanauan - Sto. Tomas, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":98999979.0,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-12-05","lat":14.083845,"lon":121.155277,"sm":1419,"fm":1419,"tm":180,"am":429,"md":0.01,"ls":"boundary","ww":"San Juan","wn":"San Juan River","wd":0.01,"wp":[14.08381,121.15538],"wst":"matched","br":null,"len":null,"ph":"Phase 5","dup":[4803],"run":[4803,4741],"cl":[],"L":"records","s":89,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.34,"text":"The record contradicts itself: the municipality field and the pin point to Santo Tomas, Batangas, but the title names Batangas City, Batangas, 27 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 195,499,264.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DC0093 to 23DC0095) cover the same site, together worth PHP 291,999,142.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":3},{"i":4810,"cid":"24EB0069","pid":"P00824740LZ","t":"Construction of Flood Control Structure at Caguray River Poclolo Section, Magsaysay, Occidental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"DAVAO DEL SUR","mu":"MAGSAYSAY (DAVAO DEL SUR)","deo":"Mindoro Occidental District Engineering Office","co":"F.A. TORRES CONSTRUCTION / BLACER CONSTRUCTION CORP.","c":39192528.61,"abc":39200000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-08-15","lat":12.379827,"lon":121.188731,"sm":871,"fm":870,"tm":871,"am":871,"md":0.0,"ls":"inside","ww":"Caguray","wn":"Caguray River","wd":0.04,"wp":[12.37949,121.18892],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":746.61,"text":"The record contradicts itself: the title and the pin point to Magsaysay, Occidental Mindoro, but the municipality field names Magsaysay, Davao del Sur, 747 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":564},{"i":4811,"cid":"21BI0048","pid":"P00561678LZ","t":"Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Magat River, Bangar Section 1, Brgy. Bangar, Solano, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"Solano","deo":"Nueva Vizcaya District Engineering Office","co":"SHANLEY CONSTRUCTION","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-11-20","lat":16.5364,"lon":121.23851,"sm":1477,"fm":null,"tm":1477,"am":1477,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.05,"wp":[16.53605,121.23877],"wst":"matched","br":"Bangar","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3591},{"i":4812,"cid":"23BI0026","pid":"P00742117LZ","t":"Construction of Flood Control and Drainage Structures (FCDS) along Sta. Fe River, Almaguer North Section, Bambang, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":59400000.0,"abc":59400000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-08-24","lat":16.363589,"lon":121.093561,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Fe","wn":"Sta. Fe River","wd":9.16,"wp":[16.29706,121.04263],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3592},{"i":4813,"cid":"24DP0089","pid":"P00846074LZ","t":"Construction of Line Canal, Brgy. 2b, San Pablo, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SAN PABLO CITY (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"DANRICH BUILDERS CORPORATION","c":4811400.0,"abc":4950000.0,"fy":"2024","sd":"06/11/2024","cd":"2024-11-12","lat":14.062351,"lon":121.320361,"sm":1346,"fm":1346,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"2b","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3593},{"i":4814,"cid":"22DO0044","pid":"P00637804LZ","t":"Construction of Flood Control Structures along Upper Marikina River (Phase II), Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"EL-JAKE BUILDERS","c":19800000.0,"abc":19800000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-05-11","lat":14.73767,"lon":121.15575,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase II","dup":[],"run":[4781,4850,4755,4788,4821],"cl":[4336,4567,4681,4713,4755,4781,4788,4821,4850,4852,4885],"L":"field","s":43,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":168},{"i":4815,"cid":"22ED0115","pid":"P00639521LZ","t":"Construction of Bucayao River Control Calapan City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":38392547.71,"abc":39200000.0,"fy":"2022","sd":"05/26/2022","cd":"2022-10-24","lat":13.31083,"lon":121.1894,"sm":377,"fm":377,"tm":null,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao River","wd":0.08,"wp":[13.31047,121.18999],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3594},{"i":4816,"cid":"23DN0036","pid":"P00726246LZ","t":"Construction of Flood Control Structure, Calawis Creek, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"TOP KMC CONSTRUCTION AND SUPPLY CORP.","c":29399996.27,"abc":29400000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-11-02","lat":14.669346,"lon":121.238768,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":null,"dup":[],"run":[4908,4642,4653],"cl":[4603,4642,4653,4690,4778,4800,4827,4834,4841,4864,4890,4908],"L":"field","s":45,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DN0033 to 23DN0036) cover the same site, together worth PHP 176,396,548.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":140},{"i":4817,"cid":"24OD0022","pid":"P00820003LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Barangay 179 (Phase 2), Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":84662805.54,"abc":86837659.61,"fy":"2024","sd":"02/14/2024","cd":"2024-10-01","lat":14.757676,"lon":121.067694,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"179","len":null,"ph":"Phase 2","dup":[4823],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 169,300,695.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":810},{"i":4818,"cid":"22OG0102","pid":"P00621411LZ","t":"Construction of Flood Control Structures at Lumban Creek (Phase II), Barangay Matandang Balara, Quezon City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION &  TRADING","c":28341399.95,"abc":29399954.26,"fy":"2022","sd":"03/24/2022","cd":"2023-05-22","lat":14.66775,"lon":121.09357,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":"Lumban","wn":"Lumban Creek","wd":0.04,"wp":[14.66811,121.09369],"wst":"matched","br":"Matandang Balara","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3595},{"i":4819,"cid":"23PC0027","pid":"P00726402LZ","t":"Construction of Apayao-Abulug River Basin Flood Control Structure, Barocboc Section, Sta. 19 + 657 - Sta. 20 + 135 (L/S), Sta. Marcela, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"SANTA MARCELA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":96483381.66,"abc":96500000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-15","lat":18.30959,"lon":121.41373,"sm":1390,"fm":1390,"tm":1390,"am":830,"md":0.04,"ls":"boundary","ww":"Apayao-Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":478.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3596},{"i":4820,"cid":"24PM0034","pid":"P00821147LZ","t":"Construction of Saliok Drainage System, Saliok, Natonin, Mountain Province","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"NATONIN (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"A.P.O. GENERAL CONSTRUCTION","c":23793040.0,"abc":24162880.0,"fy":"2024","sd":"05/02/2024","cd":"2024-12-09","lat":17.15338,"lon":121.32071,"sm":1016,"fm":1016,"tm":1016,"am":1016,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3597},{"i":4821,"cid":"22DO0048","pid":"P00630948LZ","t":"Construction of Flood Control Structures of Lukutang Malaki River (Tributary of Marikina River), Phase III, Sitio Anginan, Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":65620000.0,"abc":65620000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-08-22","lat":14.764018,"lon":121.155976,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase III","dup":[],"run":[4781,4814,4850,4755,4788],"cl":[4336,4567,4681,4713,4755,4781,4788,4814,4850,4852,4885],"L":"field","s":51,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":99},{"i":4822,"cid":"23ED0028","pid":"P00727183LZ","t":"Construction of Mag-Asawang Tubig River Control Structure, Sta. 0 + 000 - Sta. 0 + 200 Brgy. Tigkan, Naujan, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"FRAMECON BUILDERS","c":33774999.58,"abc":33775000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-08-25","lat":13.27972,"lon":121.1894,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-Asawang Tubig","wn":"Mag-asawang Tubig River","wd":6.26,"wp":[13.23024,121.21735],"wst":"matched","br":"Tigkan","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.26,"text":"The title names Mag-Asawang Tubig, which OpenStreetMap maps through the stated municipality, but the pin is 6.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":359},{"i":4823,"cid":"24OD0036","pid":"P00820004LZ","t":"Construction of Flood Control Wall along the Banks of Creeks in Barangay 179, Caloocan City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"CALOOCAN CITY","mu":"CALOOCAN CITY (METROPOLITAN MANILA)","deo":"Metro Manila 3rd District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":84637889.92,"abc":86847008.51,"fy":"2024","sd":"02/14/2024","cd":"2024-10-01","lat":14.757676,"lon":121.067694,"sm":308,"fm":308,"tm":308,"am":308,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"179","len":null,"ph":null,"dup":[4817],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 169,300,695.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":811},{"i":4824,"cid":"23BC0025","pid":"P00727268LZ","t":"Construction of Flood Mitigation Structures along Cabicungan River, Tabbugan, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":48250000.0,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2024-01-20","lat":18.54075,"lon":121.09361,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cabicungan","wn":"Cabicungan River","wd":3.36,"wp":[18.57079,121.08876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.36,"text":"The title names Cabicungan, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":381},{"i":4825,"cid":"21PM0005","pid":"P00525917LZ","t":"Construction of Saliok Flood Control, Sta. 129 + 875 - Sta. 130 + 137 (R.S.), Natonin, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Natonin","deo":"Mountain Province 2nd District Engineering Office","co":"JFO CONSTRUCTION","c":19500000.0,"abc":19600000.0,"fy":"2021","sd":"04/06/2022","cd":"2022-08-27","lat":17.15123,"lon":121.32109,"sm":1016,"fm":null,"tm":1016,"am":1016,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":262.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3598},{"i":4826,"cid":"24DC0051","pid":"P00821329LZ","t":"Construction of Flood Mitigation Structure along San Juan River, Sto. Tomas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF SANTO TOMAS (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS","c":87610008.0,"abc":87610420.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-10","lat":14.082555,"lon":121.155986,"sm":1419,"fm":1419,"tm":1419,"am":429,"md":0.01,"ls":"boundary","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.08252,121.15598],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4833],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 174,459,859.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":95},{"i":4827,"cid":"22DN0033","pid":"P00620629LZ","t":"Construction of Flood Control Structure, Calawis Creek, Brgy. Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC.","c":29399964.95,"abc":29400000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-08-26","lat":14.66865,"lon":121.24058,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":null,"dup":[],"run":[4834,4890],"cl":[4603,4642,4653,4690,4778,4800,4816,4834,4841,4864,4890,4908],"L":"field","s":45,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0033 to 22DN0037) cover the same site, together worth PHP 133,433,566.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":141},{"i":4828,"cid":"21OB0083","pid":"P00525721LZ","t":"Improvement / Construction of Slope Protection Along San Roque / Sta. Ana River, Pateros, Metro Manila","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PATEROS","mu":"Pateros","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":30193100.58,"abc":31782211.14,"fy":"2021","sd":"07/28/2021","cd":"2022-10-19","lat":14.543517,"lon":121.067967,"sm":1112,"fm":null,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3599},{"i":4829,"cid":"24ED0068","pid":"P00825128LZ","t":"Construction of River Control Structure along Panggalaan River, Brgy. Tigkan, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96500000.0,"abc":98000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-05-08","lat":13.279722,"lon":121.189444,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Panggalaan","wn":"Panggalaan River","wd":0.15,"wp":[13.28043,121.19063],"wst":"matched","br":"Tigkan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3600},{"i":4830,"cid":"23OF0024","pid":"P00726018LZ","t":"Construction of Flood Control Structure and Tributaries at Barangay Payatas, Quezon City (Phase 8)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 1st District Engineering Office","co":"C & F CONSTRUCTION & DEVELOPMENT CORPORATION","c":48019682.16,"abc":48999671.46,"fy":"2023","sd":"02/13/2023","cd":"2023-12-09","lat":14.705348,"lon":121.093811,"sm":1191,"fm":1191,"tm":1191,"am":1191,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Payatas","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3601},{"i":4831,"cid":"22DD0054","pid":"P00620563LZ","t":"Construction of Slope Protection Structure along Lawaye River, Palingowak and Balagbag Section, San Juan, Batangas","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR","c":47532070.0,"abc":49000000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-16","lat":13.81697,"lon":121.41433,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.02,"wp":[13.81694,121.41419],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3602},{"i":4832,"cid":"24EI0046","pid":"P00839658LZ","t":"Construction of Drainage Canal, Barangay Maujao, Bulalacao, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"SOSEP BUILDERS","c":4947019.45,"abc":4950000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-05-16","lat":12.296694,"lon":121.322028,"sm":249,"fm":249,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maujao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3603},{"i":4833,"cid":"24DC0053","pid":"P00821330LZ","t":"Construction of Flood Mitigation Structure along San Juan River, Tanauan City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"CITY OF TANAUAN (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS","c":86849850.8,"abc":86850000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-10","lat":14.082555,"lon":121.155986,"sm":429,"fm":429,"tm":429,"am":429,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":0.0,"wp":[14.08252,121.15598],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4826],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 174,459,859.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":96},{"i":4834,"cid":"22DN0035","pid":"P00620216LZ","t":"Construction of Flood Control Structure, Calawis River, Brgy. Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":55033609.54,"abc":55033950.0,"fy":"2022","sd":"03/03/2022","cd":"2022-11-27","lat":14.66873,"lon":121.2406,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":null,"dup":[],"run":[4827,4890],"cl":[4603,4642,4653,4690,4778,4800,4816,4827,4841,4864,4890,4908],"L":"field","s":51,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0033 to 22DN0037) cover the same site, together worth PHP 133,433,566.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":100},{"i":4835,"cid":"21DO0066","pid":"P00561564LZ","t":"Construction of Slope Protection at Mascap River, Sitio Kislatan, Barangay Mascap, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"L. EUSEBIO ACE DEVELOPMENT CORPORATION","c":29700000.0,"abc":29700000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-05","lat":14.762991,"lon":121.189728,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Mascap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mascap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3604},{"i":4836,"cid":"22DH0081","pid":"P00644533LZ","t":"Repair/Rehabilitation/Improvement of River Control along Sta. Cruz River, Brgy Sto. Anghel Sur, Sta. Cruz, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"ISOBEL CONCRETE CONSTRUCTOR CORPORATION","c":23812512.45,"abc":24125000.0,"fy":"2022","sd":"11/22/2022","cd":"2023-08-18","lat":14.280285,"lon":121.414444,"sm":1376,"fm":1376,"tm":1376,"am":1376,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Anghel Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3605},{"i":4837,"cid":"22O00043","pid":"P00639312LZ","t":"Construction of Drainage System along Sumulong Highway including\nlaterals, Marikina City (Phase I)","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ANORE CONSTRUCTION","c":183330845.0,"abc":183574083.6,"fy":"2022","sd":"06/17/2022","cd":"2024-04-24","lat":14.636162,"lon":121.093866,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3606},{"i":4838,"cid":"23DO0062","pid":"P00742447LZ","t":"Construction of Drainage System, Brgy. Halayhayin, Pililla, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"PILILLA (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GKB BUILDERS","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-08-12","lat":14.467594,"lon":121.323147,"sm":1138,"fm":1138,"tm":1138,"am":1138,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Halayhayin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3607},{"i":4839,"cid":"24DI0034","pid":"P00820382LZ","t":"Rehabilitation of Revetment along Landayan Waterways (near Landayan Road), Barangay Landayan, City of San Pedro, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":94087500.0,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2025-01-17","lat":14.352853,"lon":121.068097,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Landayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3608},{"i":4840,"cid":"22PK0087","pid":"P00644764LZ","t":"Repair/Rehabilitation of National Road along Mt. Province Bdry.-Calanan-Pinukouk-Abbut Road, K0488 + 600 - K0488 + 667.5, Mallango, Tinglayan, Kalinga","w":"Construction of Slope Protection Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":11540507.97,"abc":11551050.0,"fy":"2022","sd":"01/12/2023","cd":"2023-10-24","lat":17.314388,"lon":121.156168,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3609},{"i":4841,"cid":"23DN0007","pid":"P00726235LZ","t":"Construction of Flood Control Structure, Calawis River (Upstream) Phase 2, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"1C4M BUILDERS INC. / GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48999996.22,"abc":49000000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-09-21","lat":14.667043,"lon":121.241638,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Calawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[4603,4642,4653,4690,4778,4800,4816,4827,4834,4864,4890,4908],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":883},{"i":4842,"cid":"24DP0049","pid":"P00820380LZ","t":"Construction of Slope Protection Works at Sampaloc Lake, San Pablo City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SAN PABLO CITY (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION)","c":96487650.86,"abc":96500000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-12-24","lat":14.080652,"lon":121.324675,"sm":1346,"fm":1346,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":"Sampaloc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3610},{"i":4843,"cid":"22PC0063","pid":"P00640502LZ","t":"Construction of Flood Control Structure in Brgy. Cadaclan, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"E.C.V. CONSTRUCTION","c":6827260.01,"abc":6930000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-09-15","lat":18.42887,"lon":121.18985,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cadaclan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3611},{"i":4844,"cid":"24DO0012","pid":"P00839652LZ","t":"Construction of Flood Control Structure, Barangay Daraitan, Tanay, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"TANAY (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"D.C. SANDIL CONSTRUCTION AND REALTY DEVELOPMENT, I","c":19800000.0,"abc":19800000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-11-14","lat":14.627,"lon":121.41538,"sm":1541,"fm":1541,"tm":1541,"am":1541,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daraitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3612},{"i":4845,"cid":"24OB0089","pid":"P00824588LZ","t":"Rehabilitation of Ngusong Buwaya Creek, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":4797841.91,"abc":4899450.13,"fy":"2024","sd":"03/27/2024","cd":"2024-06-24","lat":14.5773,"lon":121.09392,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Ngusong Buwaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3613},{"i":4846,"cid":"21DO0046","pid":"P00561560LZ","t":"Construction of Slope Protection of Matagbak Creek, Barangay Bagumbayan, Pililia, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":null,"deo":"Rizal 2nd District Engineering Office","co":"S.B. SORIANO CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-03","lat":14.482016,"lon":121.329273,"sm":null,"fm":null,"tm":null,"am":1138,"md":null,"ls":"unknown","ww":"Matagbak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":132},{"i":4847,"cid":"23PC0037","pid":"P00735965LZ","t":"Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"CALANASAN (BAYAG) (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"TAGEL CORPORATION / AQUILA CONSTRUCTION CO.","c":93386847.09,"abc":96500000.0,"fy":"2023","sd":"06/22/2023","cd":"2024-03-15","lat":18.42909,"lon":121.18986,"sm":294,"fm":294,"tm":294,"am":294,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":21.63,"wp":[18.4468,120.98596],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":51,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.8,"value":21.63,"text":"The title names Apayao, which OpenStreetMap maps through the stated municipality, but the pin is 21.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":185},{"i":4848,"cid":"23PC0034","pid":"P00726401LZ","t":"Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 384 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"SANTA MARCELA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":83452531.58,"abc":86850000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-12-15","lat":18.27672,"lon":121.41594,"sm":1390,"fm":1390,"tm":1390,"am":1390,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.41,"wp":[18.27309,121.41646],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3614},{"i":4849,"cid":"23DD0187","pid":"P00742403LZ","t":"Construction (Completion) of Drainage System, Brgy. Bigain II, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":3841200.0,"abc":3960000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-07-12","lat":13.89493,"lon":121.06811,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bigain II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3615},{"i":4850,"cid":"22DO0045","pid":"P00637805LZ","t":"Construction of Flood Control Structures along Upper Marikina River  (Phase III), Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"EL-JAKE BUILDERS","c":19800000.0,"abc":19800000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-05-11","lat":14.73747,"lon":121.15669,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase III","dup":[],"run":[4781,4814,4755,4788,4821],"cl":[4336,4567,4681,4713,4755,4781,4788,4814,4821,4852,4885],"L":"field","s":43,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (22DO0043 to 22DO0048) cover the same site, together worth PHP 256,260,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":169},{"i":4851,"cid":"22DN0028","pid":"P00620631LZ","t":"Construction of Flood Control Structure, Pulang Panyo to Binayoyo (Phase 3), Brgy. San Jose, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48828460.71,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2023-03-24","lat":14.64569,"lon":121.24348,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":"Phase 3","dup":[],"run":[4373,4630],"cl":[4373,4544,4550,4571,4609,4630,4635,4731,4738],"L":"field","s":46,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0028 to 22DN0032) cover the same site, together worth PHP 127,226,749.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay San Jose (2022 to 2023), totalling PHP 409,135,951.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":134},{"i":4852,"cid":"22DO0051","pid":"P00630949LZ","t":"Construction of Flood Control Structures of Lukutang Malaki River (Tributary of Marikina River), Phase IV, Sitio Anginan, Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":65620000.0,"abc":65620000.0,"fy":"2022","sd":"03/15/2022","cd":"2022-08-22","lat":14.765886,"lon":121.156788,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[4336,4567,4681,4713,4755,4781,4788,4814,4821,4850,4885],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":884},{"i":4853,"cid":"22DE0019","pid":"P00631283LZ","t":"Construction of Flood Control Structure at Barangay Soloc Downstream, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"TCSC CORP. / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-07-14","lat":13.62287,"lon":121.24472,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Soloc Downstream","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3616},{"i":4854,"cid":"23OB0079","pid":"P00725959LZ","t":"Rehabilitation of Drainage System along Interior Roads Villa Miguela Barangay Pinagbuhatan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"WAY MAKER GENERAL CONTRACTOR OPC","c":4192131.3,"abc":4409768.31,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.557653,"lon":121.094053,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4189,4981,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4884,4899,4932,4981],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":216},{"i":4855,"cid":"22DP0056","pid":"P00620593LZ","t":"Construction of Slope Protection along Nagcarlan River at Brgy. Poblacion 2, Nagcarlan, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"NAGCARLAN (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"02/25/2022","cd":"2023-03-18","lat":14.131522,"lon":121.416209,"sm":1005,"fm":1005,"tm":1005,"am":1005,"md":0.0,"ls":"inside","ww":"Nagcarlan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3617},{"i":4856,"cid":"23BI0013","pid":"P00727119LZ","t":"Construction of Bonfal Proper Flood Control along Magat River, Bayombong, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAYOMBONG (CAPITAL) (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"R.O. BUILDERS & DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-09-17","lat":16.4872,"lon":121.18991,"sm":197,"fm":197,"tm":197,"am":197,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.06,"wp":[16.48669,121.19021],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3618},{"i":4857,"cid":"22EI0108","pid":"P00639531LZ","t":"Construction of Flood Control Structure, Bongabong River, Bongabong, (Lisap Section), Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48999964.46,"abc":48999151.38,"fy":"2022","sd":"04/13/2022","cd":"2023-07-19","lat":12.681944,"lon":121.331667,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":2.64,"wp":[12.69737,121.35023],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3619},{"i":4858,"cid":"21DP0063","pid":"P00561545LZ","t":"Construction of Flood Control Structure along Bañadero River, San Pablo City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"San Pablo City","deo":"Laguna 3rd District Engineering Office","co":"WERR CORPORATION INTERNATIONAL / PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION)","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"02/18/2022","cd":"2022-12-14","lat":14.068034,"lon":121.332106,"sm":1346,"fm":null,"tm":1346,"am":1346,"md":0.0,"ls":"inside","ww":"Bañadero","wn":"Bañadero River","wd":0.03,"wp":[14.06783,121.33221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3620},{"i":4859,"cid":"22E00011","pid":"P00620266LZ","t":"Construction of River Control Project at Subaan River (Phase I), San Teodoro, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"SAN TEODORO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":144749612.6,"abc":144748654.4,"fy":"2022","sd":"02/23/2022","cd":"2023-04-09","lat":13.080201,"lon":121.335657,"sm":1360,"fm":1360,"tm":1360,"am":1472,"md":44.7,"ls":"outside","ww":"Subaan","wn":"Subaan River","wd":0.02,"wp":[13.08032,121.33555],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[4860,4863],"run":[],"cl":[],"L":"records","s":76,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":44.7,"text":"The pin is 44.7 km outside San Teodoro, Oriental Mindoro, the nearest municipality the record claims. It falls in Socorro, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 385,989,306.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":28},{"i":4860,"cid":"22E00012","pid":"P00620267LZ","t":"Construction of River Control Project at Subaan River (Phase II), San Teodoro, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"SAN TEODORO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.","c":144748796.8,"abc":144748654.3,"fy":"2022","sd":"03/22/2022","cd":"2023-04-25","lat":13.080201,"lon":121.335657,"sm":1360,"fm":1360,"tm":1360,"am":1472,"md":44.7,"ls":"outside","ww":"Subaan","wn":"Subaan River","wd":0.02,"wp":[13.08032,121.33555],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[4859,4863],"run":[],"cl":[],"L":"records","s":76,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":44.7,"text":"The pin is 44.7 km outside San Teodoro, Oriental Mindoro, the nearest municipality the record claims. It falls in Socorro, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 385,989,306.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":29},{"i":4861,"cid":"24E00052","pid":"P00839491LZ","t":"Construction of Road Dike along Bucayao River (East Side), Sitio Malaya Section, Barangay Tagumpay, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":247497396.4,"abc":247500000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-07-04","lat":13.1691,"lon":121.157208,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao River","wd":7.3,"wp":[13.23267,121.13924],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[4865],"run":[],"cl":[],"L":"records","s":81,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.3,"text":"The title names Bucayao, which OpenStreetMap maps through the stated municipality, but the pin is 7.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 440,495,241.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":18},{"i":4862,"cid":"22OB0103","pid":"P00620050LZ","t":"Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 2, Taguig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":91674599.88,"abc":96499578.82,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.526827,"lon":121.068232,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":"Taguig","wn":"Taguig River","wd":0.02,"wp":[14.52694,121.06833],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[4729,4037,4039,4000,4016,4066,4077,4031,4033],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22OB0100 to 22OB0109) cover the same site, together worth PHP 938,254,340.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":362},{"i":4863,"cid":"22E00013","pid":"P00620268LZ","t":"Construction of River Control Project at Subaan River (Phase III), San Teodoro, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"SAN TEODORO (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96490896.94,"abc":96499875.45,"fy":"2022","sd":"03/22/2022","cd":"2022-11-18","lat":13.080201,"lon":121.335657,"sm":1360,"fm":1360,"tm":1360,"am":1472,"md":44.7,"ls":"outside","ww":"Subaan","wn":"Subaan River","wd":0.02,"wp":[13.08032,121.33555],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[4859,4860],"run":[],"cl":[],"L":"records","s":72,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":44.7,"text":"The pin is 44.7 km outside San Teodoro, Oriental Mindoro, the nearest municipality the record claims. It falls in Socorro, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 385,989,306.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":45},{"i":4864,"cid":"22DN0027","pid":"P00620624LZ","t":"Construction of Flood Control Structure (Upstream) Phase 4, Sitio Binayoyo, Brgy. Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999611.62,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.64391,"lon":121.24505,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calawis","len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[4603,4642,4653,4690,4778,4800,4816,4827,4834,4841,4890,4908],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":885},{"i":4865,"cid":"24E00187","pid":"P00825123LZ","t":"Construction of Flood Control Structure along Bongabong River, barangay Lisap, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"STX ENTERPRISES","c":192997844.4,"abc":193000000.0,"fy":"2024","sd":"03/23/2024","cd":"2024-11-07","lat":13.1691,"lon":121.157208,"sm":223,"fm":223,"tm":223,"am":1017,"md":46.92,"ls":"outside","ww":"Bongabong","wn":"Bongabong River","wd":29.91,"wp":[12.8996,121.17836],"wst":"matched","br":"Lisap","len":null,"ph":null,"dup":[4861],"run":[],"cl":[],"L":"records","s":94,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":46.92,"text":"The pin is 46.9 km outside Bongabong, Oriental Mindoro, the nearest municipality the record claims. It falls in Naujan, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.84,"value":29.91,"text":"The title names Bongabong, which OpenStreetMap maps through the stated municipality, but the pin is 29.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 440,495,241.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1},{"i":4866,"cid":"24EI0019","pid":"P00821355LZ","t":"Construction of Bansud River Control, Sta. 6+909 - Sta. 7+340 (Upstream - Right Side), Barangay Conrazon, Bansud, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BANSUD (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":67547177.24,"abc":67550000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-12-29","lat":12.861111,"lon":121.416389,"sm":156,"fm":156,"tm":156,"am":156,"md":0.0,"ls":"inside","ww":"Bansud","wn":"Bansud","wd":0.01,"wp":[12.86122,121.41645],"wst":"matched","br":"Conrazon","len":431.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3621},{"i":4867,"cid":"23OB0071","pid":"P00727001LZ","t":"Rehabilitation of Drainage System at Barangay Bagong Ilog, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"W. GOMEZ TRADING AND CONSTRUCTION","c":3702257.74,"abc":3919512.03,"fy":"2023","sd":"03/24/2023","cd":"2023-08-20","lat":14.561996,"lon":121.068244,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3622},{"i":4868,"cid":"22OB0159","pid":"P00620071LZ","t":"Construction of Slope Protection at Labasan Pumping Station Retarding Pond, Taguig City (Package 2)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"TAGUIG CITY","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / EBUILDERS CONSTRUCTION & DEVELOPMENT CORP.","c":89793537.38,"abc":94569742.72,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":14.529834,"lon":121.094054,"sm":1521,"fm":1521,"tm":1521,"am":1521,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3623},{"i":4869,"cid":"23BC0074","pid":"P00727344LZ","t":"Construction of Masi Flood Control Structure along Pamplona River, Pamplona, Cagayan (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PAMPLONA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":40180000.0,"abc":40180000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-10-09","lat":18.458333,"lon":121.336111,"sm":1074,"fm":1074,"tm":1074,"am":1074,"md":0.0,"ls":"inside","ww":"Pamplona","wn":"Pamplona River","wd":0.27,"wp":[18.46027,121.33774],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3624},{"i":4870,"cid":"22DN0133","pid":"P00637801LZ","t":"Construction of Slope Protection, Brgy. Mahabang Parang (Package 2), Angono, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"D.R. ROBLES CONSTRUCTION","c":9402844.07,"abc":9900000.0,"fy":"2022","sd":"07/04/2022","cd":"2023-01-19","lat":14.541694,"lon":121.190247,"sm":62,"fm":206,"tm":62,"am":62,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahabang Parang","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3625},{"i":4871,"cid":"24DO0007","pid":"P00839653LZ","t":"Construction of Slope Protection Structure along Sakayin Creek at Sitio Namay, Sitio Caingin, and Sitio Wawa, Barangay San Juan, Morong, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MORONG (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"GKB BUILDERS","c":14850000.0,"abc":14850000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-10","lat":14.5158,"lon":121.24523,"sm":991,"fm":991,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":"Sakayin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3626},{"i":4872,"cid":"24PK0027","pid":"P00824677LZ","t":"Construction of Waros Creek Flood Control Brgy. Bangad, Tinglayan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"TINGLAYAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"JEP CONSTRUCTION","c":1949979.46,"abc":1960000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-08-22","lat":17.28484,"lon":121.15831,"sm":1569,"fm":1569,"tm":1569,"am":1569,"md":0.0,"ls":"inside","ww":"Waros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bangad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3627},{"i":4873,"cid":"22PK0027","pid":"P00621015LZ","t":"Construction of Balinciagao Creek Flood Control Structure, Sta. 171+170 - Sta. 171+270 (B.S.), Balinciagao Sur, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PASIL (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":14589077.57,"abc":14700000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-15","lat":17.40803,"lon":121.19082,"sm":1108,"fm":1108,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":"Balinciagao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3628},{"i":4874,"cid":"22PL0024","pid":"P00620806LZ","t":"Construction of Flood Control Structure along Saltan River, Sta. 15 + 700 - Sta. 16 + 650, Apatan, Pinukpuk, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PINUKPUK (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":77200000.0,"abc":77187735.33,"fy":"2022","sd":"03/21/2022","cd":"2023-04-13","lat":17.556667,"lon":121.337444,"sm":1145,"fm":1145,"tm":1145,"am":1145,"md":0.0,"ls":"inside","ww":"Saltan","wn":"Saltan River","wd":7.64,"wp":[17.61296,121.37917],"wst":"matched","br":null,"len":950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.64,"text":"The title names Saltan, which OpenStreetMap maps through the stated municipality, but the pin is 7.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":260},{"i":4875,"cid":"21D00008","pid":"P00526305LZ","t":"Construction of Flood Control Structures along Calumpang River, Batangas (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"Batangas City","deo":"Batangas 2nd District Engineering Office","co":"PHESCO, INCORPORATED","c":144749597.3,"abc":144750000.0,"fy":"2021","sd":"06/21/2021","cd":"2023-03-03","lat":13.762538,"lon":121.068271,"sm":180,"fm":null,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.04,"wp":[13.76232,121.0686],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3629},{"i":4876,"cid":"23DI0137","pid":"P00740647LZ","t":"Construction of Structure for River Protection Along Sta. Rosa River, (Near Macabling Dam), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES / ORA ET LABORA CONSTRUCTION INC","c":47724810.65,"abc":49000000.0,"fy":"2023","sd":"06/27/2023","cd":"2024-04-12","lat":14.297531,"lon":121.094267,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":"River Protection Along Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3630},{"i":4877,"cid":"23BC0064","pid":"P00727270LZ","t":"Construction of Libertad Flood Control along Abulug River, Abulug Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"CMG JR. BUILDERS / J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-22","lat":18.3345,"lon":121.41653,"sm":3,"fm":3,"tm":null,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.33363,121.41673],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3631},{"i":4878,"cid":"23PL0090","pid":"P00742290LZ","t":"Construction of Drainage Canal Sytem in Mapaco, Pinukpuk, Kalinga and Barangays Bulanao (Casabaan 1&2, Hilltop, Bacacao, Capitol), Ipil (Lower Ipil 1B and 2C) and Nambaran, Tabuk City, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"BIGA CONSTRUCTION","c":6918940.57,"abc":6923941.35,"fy":"2023","sd":"07/05/2023","cd":"2023-11-15","lat":17.2548,"lon":121.2458,"sm":424,"fm":424,"tm":424,"am":1547,"md":11.93,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulanao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.86,"value":11.93,"text":"The pin is 11.9 km outside City of Tabuk, Kalinga, the nearest municipality the record claims. It falls in Tanudan, Kalinga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":316},{"i":4879,"cid":"24E00053","pid":"P00839492LZ","t":"Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":247496511.7,"abc":247500000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-07-04","lat":13.164916,"lon":121.158392,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao River","wd":7.78,"wp":[13.23267,121.13924],"wst":"matched","br":"Tagumpay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":48,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.65,"value":7.78,"text":"The title names Bucayao, which OpenStreetMap maps through the stated municipality, but the pin is 7.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":208},{"i":4880,"cid":"24E00036","pid":"P00823574LZ","t":"Construction of Road Dike/Esplanade along Pangalaan River (Right Side), Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":241246360.9,"abc":241250000.0,"fy":"2024","sd":"03/09/2024","cd":"2024-07-15","lat":13.262005,"lon":121.191592,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Pangalaan","wn":"Panggalaan River","wd":0.21,"wp":[13.26041,121.19059],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3632},{"i":4881,"cid":"24OB0158","pid":"P00845865LZ","t":"Construction/Rehabilitation of Retaining Wall along Sta. Ana River, Pateros, Metro Manila (Package VII)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION","c":48485215.11,"abc":49499955.34,"fy":"2024","sd":"04/01/2024","cd":"2024-11-15","lat":14.544267,"lon":121.068363,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package VII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3633},{"i":4882,"cid":"22BC0028","pid":"P00621038LZ","t":"Construction of Masi Flood Control Structure along Pamplona River (Sta. 0+000 - Sta. 0+250), Pamplona, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PAMPLONA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-10-11","lat":18.4585,"lon":121.33746,"sm":1074,"fm":1074,"tm":1074,"am":1074,"md":0.0,"ls":"inside","ww":"Pamplona","wn":"Pamplona River","wd":0.15,"wp":[18.45905,121.33877],"wst":"matched","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3634},{"i":4883,"cid":"22D00076","pid":"P00621476LZ","t":"Construction of Flood Control Structures along Lawaye River, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J / JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY)","c":144749317.9,"abc":144750000.0,"fy":"2022","sd":"04/05/2022","cd":"2023-08-23","lat":13.814942,"lon":121.416766,"sm":1311,"fm":1311,"tm":180,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.03,"wp":[13.81481,121.41653],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":26.91,"text":"The record contradicts itself: the municipality field and the pin point to San Juan, Batangas, but the title names Batangas City, Batangas, 27 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":433},{"i":4884,"cid":"24OB0094","pid":"P00824593LZ","t":"Rehabilitation of Drainage System and Site Development at Munting Bahayan and Vicinity, Barangay Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"E.L. ANOLIN CONSTRUCTION","c":14398406.78,"abc":14699274.33,"fy":"2024","sd":"04/08/2024","cd":"2024-09-27","lat":14.561465,"lon":121.094267,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4899,4932,4981],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":924},{"i":4885,"cid":"22DO0052","pid":"P00630950LZ","t":"Construction of Flood Control Structures of Lukutang Malaki River (Tributary of Marikina River), Phase V, Sitio Anginan, Brgy. San Isidro, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":65620000.0,"abc":65620000.0,"fy":"2022","sd":"03/15/2022","cd":"2022-10-03","lat":14.767056,"lon":121.159167,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[4336,4567,4681,4713,4755,4781,4788,4814,4821,4850,4852],"L":"field","s":25,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.33,"value":12,"text":"12 separate contracts name Barangay San Isidro (2021 to 2023), totalling PHP 688,991,642.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":886},{"i":4886,"cid":"23PK0077","pid":"P00726663LZ","t":"Construction of Flood Control along Chico River, Sta. 174 + 270 - Sta. 174 + 350 (R.S.), Barangay Mabongtot, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"HKBT CONSTRUCTION","c":4893851.15,"abc":4900000.0,"fy":"2023","sd":"06/19/2023","cd":"2023-11-05","lat":17.341783,"lon":121.192486,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.03,"wp":[17.34148,121.19249],"wst":"matched","br":"Mabongtot","len":80.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3635},{"i":4887,"cid":"24OB0160","pid":"P00825200LZ","t":"Construction of Drainage Outfall at M. Armada St. and M. Lozada St. and Vicinity, Pateros, Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"B. VALENCERINA TRADING & CONSTRUCTION","c":6653876.22,"abc":6859666.21,"fy":"2024","sd":"04/08/2024","cd":"2025-02-01","lat":14.551661,"lon":121.068407,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3636},{"i":4888,"cid":"23DP0071","pid":"P00726932LZ","t":"Construction of Flood Control Structure along Guacat River, Brgy. Dayap, Calauan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CALAUAN (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":91656824.01,"abc":91675000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-01-22","lat":14.186385,"lon":121.337748,"sm":302,"fm":302,"tm":302,"am":1627,"md":0.15,"ls":"boundary","ww":"Guacat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dayap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3637},{"i":4889,"cid":"23DP0066","pid":"P00726933LZ","t":"Construction of Slope Protection for Oplis Br. Liliw, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LILIW (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"MEGA M BUILDERS CORPORATION (FORMERLY: MEGA M BUILDERS) / THREE W BUILDERS, INC.","c":91409355.92,"abc":91675000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-12-13","lat":14.14428,"lon":121.41739,"sm":789,"fm":789,"tm":null,"am":1005,"md":0.38,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3638},{"i":4890,"cid":"22DN0037","pid":"P00620622LZ","t":"Construction of Box Culvert with Approaches/Slope Protection, Sitio Kinapuin, Brgy. Calawis, Antipolo City","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999991.59,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2023-12-18","lat":14.67295,"lon":121.24582,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calawis","len":null,"ph":null,"dup":[],"run":[4827,4834],"cl":[4603,4642,4653,4690,4778,4800,4816,4827,4834,4841,4864,4908],"L":"field","s":50,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DN0033 to 22DN0037) cover the same site, together worth PHP 133,433,566.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":106},{"i":4891,"cid":"22PL0027","pid":"P00621005LZ","t":"Construction of Amlao Flood Control Structure along Chico River, Sta. 110+100 - Sta. 111+000, Brgy. Amlao, Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"CELESTINO CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: JJA CONSTRUCTION & SUPPLY)","c":40254513.26,"abc":40479866.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-14","lat":17.599856,"lon":121.338321,"sm":424,"fm":424,"tm":424,"am":1145,"md":10.24,"ls":"outside","ww":"Chico","wn":"Chico River","wd":8.54,"wp":[17.62177,121.41543],"wst":"matched","br":"Amlao","len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.24,"text":"The pin is 10.2 km outside City of Tabuk, Kalinga, the nearest municipality the record claims. It falls in Pinukpuk, Kalinga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.54,"text":"The title names Chico, which OpenStreetMap maps through the stated municipality, but the pin is 8.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":97},{"i":4892,"cid":"23DD0004","pid":"P00726208LZ","t":"Construction of Revetment along Balintawak Bridge, Lipa City, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"LIPA CITY (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"THREE W BUILDERS, INC.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-02","lat":13.9575,"lon":121.15944,"sm":799,"fm":799,"tm":799,"am":799,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3639},{"i":4893,"cid":"23E00126","pid":"P00736057LZ","t":"Construction of Road Dike/Esplanade along Bongabong River, Morente-Lisap Section, Bongabong, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP. / ACIER & BETON CONSTRUCTION","c":217123081.7,"abc":217124999.6,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.343,"lon":121.3387,"sm":223,"fm":223,"tm":223,"am":249,"md":31.81,"ls":"outside","ww":"Bongabong","wn":"Bongabong River","wd":0.03,"wp":[12.34312,121.33898],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":31.81,"text":"The pin is 31.8 km outside Bongabong, Oriental Mindoro, the nearest municipality the record claims. It falls in Bulalacao, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":74},{"i":4894,"cid":"22DI0072","pid":"P00632897LZ","t":"Construction of Flood Control from National Highway Magsaysay St. to Quirino St. & Continuation to Sitio Tamuro in Barangay Landayan, San Pedro, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"AYANA CONSTRUCTION AND TRADING","c":4843901.6,"abc":4950000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-08-01","lat":14.35416,"lon":121.06848,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Landayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3640},{"i":4895,"cid":"22EI0087","pid":"P00639523LZ","t":"Construction of Balite River Control Structure, Brgy. Manguyang Section, Gloria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"GLORIA (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":47764451.36,"abc":48999224.56,"fy":"2022","sd":"08/12/2022","cd":"2023-05-18","lat":12.924444,"lon":121.418611,"sm":589,"fm":589,"tm":589,"am":589,"md":0.0,"ls":"inside","ww":"Balite","wn":"Balite River","wd":3.01,"wp":[12.95109,121.42415],"wst":"matched","br":"Manguyang Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.01,"text":"The title names Balite, which OpenStreetMap maps through the stated municipality, but the pin is 3.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":391},{"i":4896,"cid":"21PK0035","pid":"P00525939LZ","t":"Construction of Dalayap Flood Control Sta. 149+300 - Sta. 149+325 (B.S.), Salegseg, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Balbalan","deo":"Upper Kalinga District Engineering Office","co":"SALTAN RIVER CORPORATION","c":2816343.9,"abc":2940000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-10-24","lat":17.502112,"lon":121.192677,"sm":125,"fm":null,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":25.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3641},{"i":4897,"cid":"22PL0035","pid":"P00632786LZ","t":"Construction of Kaus/ Mapaco Flood Control, Barangay Pinukpuk Jct./Mapaco, Pinukpuk, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PINUKPUK (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES","c":4839336.32,"abc":4948999.0,"fy":"2022","sd":"03/31/2022","cd":"2022-10-05","lat":16.697909,"lon":121.245966,"sm":1145,"fm":1145,"tm":1145,"am":744,"md":82.71,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinukpuk Jct./Mapaco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":82.71,"text":"The pin is 82.7 km outside Pinukpuk, Kalinga, the nearest municipality the record claims. It falls in Lamut, Ifugao.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":277},{"i":4898,"cid":"21DN0124","pid":"P00526132LZ","t":"Construction of Flood Control Structure at Angono River, Barangay San Isidro, Angono Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":null,"deo":"Rizal 1st District Engineering Office","co":"A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL","c":37231649.95,"abc":39200000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-11-18","lat":14.53177,"lon":121.15951,"sm":null,"fm":null,"tm":null,"am":62,"md":null,"ls":"unknown","ww":"Angono","wn":"Angono River","wd":0.01,"wp":[14.53168,121.1595],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":133},{"i":4899,"cid":"23OB0075","pid":"P00725967LZ","t":"Rehabilitation of Drainage System along Interior Roads Isla Home 1, 2 and 3, Barangay Pinagbuhatan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"E.S. JOSEFA CONSTRUCTION","c":6514476.35,"abc":6859424.07,"fy":"2023","sd":"02/06/2023","cd":"2023-09-05","lat":14.561249,"lon":121.094359,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4189,4981,4854,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4932,4981],"L":"field","s":42,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":191},{"i":4900,"cid":"24EI0075","pid":"P00825130LZ","t":"Construction of Cawacat River (Downstream), Brgy. Campaasan Section, Bulalacao, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BULALACAO (SAN PEDRO) (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ANORE CONSTRUCTION","c":96497149.49,"abc":96500000.0,"fy":"2024","sd":"04/01/2024","cd":"2025-01-07","lat":12.342417,"lon":121.339694,"sm":249,"fm":249,"tm":249,"am":249,"md":0.0,"ls":"inside","ww":"Cawacat","wn":"Cawacat River","wd":0.28,"wp":[12.34316,121.34214],"wst":"matched","br":"Campaasan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3642},{"i":4901,"cid":"24PK0025","pid":"P00820766LZ","t":"Construction of Mung-ol Pantuklao Creek Flood Control, Sta. 170+365 - Sta. 170+405 (BS), Balinciagao Sur, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PASIL (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"W.V. CONSTRUCTION","c":4894642.74,"abc":4900000.0,"fy":"2024","sd":"04/04/2024","cd":"2024-11-26","lat":17.408622,"lon":121.192881,"sm":1108,"fm":1108,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":"Mung-ol Pantuklao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":40.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3643},{"i":4902,"cid":"23DO0064","pid":"P00726926LZ","t":"Construction of Flood Control and Bank Protection Structure along Lukutang Malaki River, Rodriguez (Montalban), Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.","c":80705888.18,"abc":96500000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-04-15","lat":14.76803,"lon":121.159883,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Lukutang Malaki","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3644},{"i":4903,"cid":"24DO0071","pid":"P00846092LZ","t":"Construction of Flood Control Structure, Morong, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MORONG (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"BSKP CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-10-14","lat":14.5168,"lon":121.24601,"sm":991,"fm":991,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3645},{"i":4904,"cid":"24PG0017","pid":"P00820742LZ","t":"Construction of Nabunlan Mungayang CIS Flood Control Structure, Kiangan, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"KIANGAN (IFUGAO)","deo":"Ifugao 1st District Engineering Office","co":"DJY CONSTRUCTION / SOUTHLAND CONSTRUCTION AND SUPPLIES","c":32239996.96,"abc":32666663.82,"fy":"2024","sd":"02/13/2024","cd":"2024-10-24","lat":16.81053,"lon":121.094533,"sm":708,"fm":708,"tm":708,"am":708,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3646},{"i":4905,"cid":"22PC0007","pid":"P00620807LZ","t":"Construction of Apayao-Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24+884-Sta. 25+380 (LS), Sta. Marcela, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"SANTA MARCELA (APAYAO)","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":77189689.42,"abc":77200000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-03-20","lat":18.27358,"lon":121.41898,"sm":1390,"fm":1390,"tm":1390,"am":1390,"md":0.0,"ls":"inside","ww":"Apayao-Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":496.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3647},{"i":4906,"cid":"24OB0168","pid":"P00821430LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package V)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":47990581.97,"abc":48999972.86,"fy":"2024","sd":"02/12/2024","cd":"2024-08-09","lat":14.540908,"lon":121.068591,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package V","dup":[],"run":[4963,4970,4917],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OB0166 to 24OB0169) cover the same site, together worth PHP 191,991,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":561},{"i":4907,"cid":"21PK0019","pid":"P00525934LZ","t":"Construction of Amdalao Drainage Systems Sta. 175+590 - Sta. 175+720 (B.S), Sitio Amdalao, Guina-ang, Pasil, Kalinga","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"RAD CONSTRUCTION","c":1888990.97,"abc":1960000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-09-09","lat":17.390258,"lon":121.159889,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":130.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3648},{"i":4908,"cid":"23DN0033","pid":"P00727172LZ","t":"Construction of Flood Control Structure, Apia River, Barangay Calawis, Antipolo City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"CITY OF ANTIPOLO (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"M.G. LUALHATI CONSTRUCTION CORP.","c":48996559.72,"abc":49000000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-11-30","lat":14.704589,"lon":121.248559,"sm":365,"fm":365,"tm":365,"am":365,"md":0.0,"ls":"inside","ww":"Apia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calawis","len":null,"ph":null,"dup":[],"run":[4642,4653,4816],"cl":[4603,4642,4653,4690,4778,4800,4816,4827,4834,4841,4864,4890],"L":"field","s":49,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23DN0033 to 23DN0036) cover the same site, together worth PHP 176,396,548.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.35,"value":13,"text":"13 separate contracts name Barangay Calawis (2022 to 2024), totalling PHP 609,606,053.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":108},{"i":4909,"cid":"22BC0030","pid":"P00621040LZ","t":"Construction of Simayung Flood Control along Abulug River, Sta. 7+241 - Sta. 7+416 Section 1, Sta. 7+416 - Sta. 7+466 Section 2, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS / W.D. NAVARRO CONSTRUCTION CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-01-08","lat":18.37987,"lon":121.41961,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.07,"wp":[18.37955,121.42018],"wst":"matched","br":null,"len":225.0,"ph":"Section 1","dup":[],"run":[5691,5590],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BC0030 to 22BC0032) cover the same site, together worth PHP 146,128,215.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":486},{"i":4910,"cid":"23OB0410","pid":"P00727232LZ","t":"Improvement Works Along Upper Marikina River at Sta. 15 + 850 to Sta. 16 + 000, Right Bank, Marikina City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION)","c":93041802.1,"abc":97999638.62,"fy":"2023","sd":"09/25/2023","cd":"2024-03-04","lat":14.65353,"lon":121.09459,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Works Along Upper Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3649},{"i":4911,"cid":"22DN0083","pid":"P00632908LZ","t":"Construction of Drainage System Leading To Lazi River, Binangonan, Rizal","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"L.L. MARRON CONSTRUCTION & TRADING","c":5312342.23,"abc":5940000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-07-27","lat":14.467091,"lon":121.192977,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"System Leading To Lazi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3650},{"i":4912,"cid":"24CD0056","pid":"P00820212LZ","t":"Construction of Flood Control Structure along Santo Cristo River (Bigte-Ipo Dam Road), San Jose Del Monte City, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"CITY OF SAN JOSE DEL MONTE (BULACAN)","deo":"Bulacan 2nd District Engineering Office","co":"TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY)","c":96496502.12,"abc":96499644.28,"fy":"2024","sd":"02/14/2024","cd":"2024-11-21","lat":14.832159,"lon":121.068595,"sm":416,"fm":416,"tm":416,"am":416,"md":0.0,"ls":"inside","ww":"Santo Cristo","wn":"Santo Cristo Creek","wd":20.02,"wp":[14.65788,121.01883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3651},{"i":4913,"cid":"21DN0109","pid":"P00526135LZ","t":"Construction of Creek Wall Protection, Malalim Na Sara Going to San Juan Creek at Brgy. Macamot And Brgy. Batingan, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Binangonan","deo":"Rizal 1st District Engineering Office","co":"GLJ CONSTRUCTION","c":15679904.51,"abc":15680000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-11-18","lat":14.47733,"lon":121.19649,"sm":206,"fm":null,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":"San Juan","wn":"San Juan River","wd":22.41,"wp":[14.59285,121.0257],"wst":"matched","br":"Macamot And Brgy. Batingan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3652},{"i":4914,"cid":"24DE0043","pid":"P00820870LZ","t":"Construction of Flood Control Structure, Barangay Talahib Pandayan, Batangas City, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-26","lat":13.642989,"lon":121.160129,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talahib Pandayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3653},{"i":4915,"cid":"24PM0042","pid":"P00844736LZ","t":"Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province","w":"Construction of Drainage Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"NATONIN (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"CNL CONSTRUCTION","c":4900000.0,"abc":4900000.0,"fy":"2024","sd":"07/29/2024","cd":"2024-08-27","lat":17.09886,"lon":121.25024,"sm":1016,"fm":1016,"tm":1016,"am":1016,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alunogan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3654},{"i":4916,"cid":"22BC0085","pid":"P00631110LZ","t":"Construction of Simayung Flood Control Structure along Abulug River, Simayung, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS","c":26460000.0,"abc":26460000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-08-28","lat":18.37987,"lon":121.419961,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.04,"wp":[18.37969,121.42028],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3655},{"i":4917,"cid":"24OB0169","pid":"P00821431LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package VI)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":48005142.75,"abc":48999793.04,"fy":"2024","sd":"02/12/2024","cd":"2024-08-09","lat":14.540872,"lon":121.068641,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package VI","dup":[],"run":[4963,4970,4906],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OB0166 to 24OB0169) cover the same site, together worth PHP 191,991,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":562},{"i":4918,"cid":"21DO0074","pid":"P00561566LZ","t":"Construction of Slope Protection at Puray River, Sitio Mahabang Buhangin, Barangay Mascap, Rodriguez, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"Rodriguez","deo":"Rizal 2nd District Engineering Office","co":"B. BERNARDO CONST., INC.","c":19007200.25,"abc":19800000.0,"fy":"2021","sd":"09/05/2022","cd":"2022-12-15","lat":14.768056,"lon":121.1975,"sm":1212,"fm":null,"tm":1212,"am":1212,"md":0.0,"ls":"inside","ww":"Puray","wn":"Puray River","wd":0.0,"wp":[14.76807,121.19752],"wst":"matched","br":"Mascap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3656},{"i":4919,"cid":"24PK0042","pid":"P00824678LZ","t":"Construction of Amdalao Flood Control, Guina-ang Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PASIL (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"ABMJ CONSTRUCTION AND AGGREGATES","c":2445325.03,"abc":2450000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-07-31","lat":17.38687,"lon":121.16027,"sm":1108,"fm":1108,"tm":null,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3657},{"i":4920,"cid":"23OB0095","pid":"P00725938LZ","t":"Rehabilitation of Flood Mitigation Structure, Mahabang Ilog Creek at Barangay Maybunga, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"EL KAPITAN CONSTRUCTION SERVICES","c":4645985.37,"abc":4899483.08,"fy":"2023","sd":"02/06/2023","cd":"2023-07-05","lat":14.574356,"lon":121.094659,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Mahabang Ilog","wn":"Mahabang Ilog Creek","wd":0.35,"wp":[14.57117,121.09448],"wst":"matched","br":"Maybunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3658},{"i":4921,"cid":"24PK0002","pid":"P00821561LZ","t":"Construction of Sukiap Flood Control along Chico River, Sta 171+005 - Sta 171 +295 (L/S) Sukiap, Tanglag, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":19592654.05,"abc":19600000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-21","lat":17.36552,"lon":121.19752,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.04,"wp":[17.36523,121.1973],"wst":"matched","br":null,"len":290.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3659},{"i":4922,"cid":"23DO0031","pid":"P00725834LZ","t":"Construction of Flood Control Structure along Morong River, Barangay San Pedro, Morong, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MORONG (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-15","lat":14.505573,"lon":121.251107,"sm":991,"fm":991,"tm":991,"am":991,"md":0.0,"ls":"inside","ww":"Morong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3660},{"i":4923,"cid":"23DI0122","pid":"P00727164LZ","t":"Rehabilitation of Flood Mitigation Structure, Landayan Creek, San Pedro City, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JA.VI CONSTRUCTION","c":28948328.0,"abc":29400000.0,"fy":"2023","sd":"05/23/2023","cd":"2023-12-09","lat":14.35422,"lon":121.0687,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":"Landayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3661},{"i":4924,"cid":"21PC0010","pid":"P00526369LZ","t":"Construction of Sipa-San Mariano Flood Control Structure along Apayao River, Sta. 25 + 380 - Sta. 25 + 700 (L/S), Sta. Marcela, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Santa Marcela","deo":"Apayao 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":45942583.67,"abc":47423180.0,"fy":"2021","sd":"12/01/2021","cd":"2022-11-28","lat":18.27023,"lon":121.42022,"sm":1390,"fm":null,"tm":1390,"am":1390,"md":0.0,"ls":"inside","ww":"Apayao","wn":"Apayao River","wd":15.92,"wp":[18.13691,121.36364],"wst":"matched","br":null,"len":320.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3662},{"i":4925,"cid":"24DC0025","pid":"P00839109LZ","t":"Rehabilitation of Line Canal, Barangay Luta Sur, Malvar, Batangas","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"MALVAR (BATANGAS)","deo":"Batangas 3rd District Engineering Office","co":"NDA BUILDERS AND DEVELOPERS","c":4949344.6,"abc":4950000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-06-13","lat":14.035761,"lon":121.160664,"sm":905,"fm":905,"tm":905,"am":905,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Luta Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3663},{"i":4926,"cid":"24OB0090","pid":"P00824589LZ","t":"Rehabilitation of Mahabang Ilog Creek, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION)","c":4802163.28,"abc":4899988.51,"fy":"2024","sd":"05/23/2024","cd":"2024-08-20","lat":14.57442,"lon":121.09466,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Mahabang Ilog","wn":"Mahabang Ilog Creek","wd":0.36,"wp":[14.57117,121.09448],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3664},{"i":4927,"cid":"21ED0153","pid":"P00526452LZ","t":"Construction of Bucayao River Control along Managpi Section, Brgy. Managpi, Calapan City, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"City of Calapan","deo":"Mindoro Oriental District Engineering Office","co":"ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY)","c":39199962.18,"abc":39200000.0,"fy":"2021","sd":"03/08/2022","cd":"2022-12-19","lat":13.317777,"lon":121.198056,"sm":377,"fm":null,"tm":377,"am":377,"md":0.0,"ls":"inside","ww":"Bucayao","wn":"Bucayao","wd":0.08,"wp":[13.31732,121.19867],"wst":"matched","br":"Managpi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3665},{"i":4928,"cid":"24C00517","pid":"P00845795LZ","t":"Construction of Flood Mitigation Structure including Road Dike, Malangaan Section (Downstream), Doña Remedios Trinidad, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"DOÑA REMEDIOS TRINIDAD (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999634.82,"abc":98999592.46,"fy":"2024","sd":"06/19/2024","cd":"2025-01-13","lat":14.9847,"lon":121.0687,"sm":529,"fm":529,"tm":529,"am":529,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3666},{"i":4929,"cid":"23DO0089","pid":"P00742449LZ","t":"Construction of Slope Protection at Barangay Mascap and Puray, Montalban, Rizal","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"RIZAL","mu":"MONTALBAN (RIZAL)","deo":"Rizal 2nd District Engineering Office","co":"SOLID PILE CONSTRUCTION","c":29700000.0,"abc":29700000.0,"fy":"2023","sd":"07/10/2023","cd":"2023-10-24","lat":14.791167,"lon":121.198333,"sm":null,"fm":null,"tm":null,"am":1212,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mascap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":134},{"i":4930,"cid":"23DI0021","pid":"P00725791LZ","t":"Construction of River Protection Structure along Maulawin Waterways, Brgy. San Antonio, Los Baños, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":48244616.0,"abc":48250000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-06-20","lat":14.174794,"lon":121.251855,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3667},{"i":4931,"cid":"23BC0023","pid":"P00726436LZ","t":"Construction of Flood Control Structure along Cadcadir River, Brgy. Bacsay Cataraoan Sur, Claveria, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CLAVERIA (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC.","c":48250000.0,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2024-03-22","lat":18.56116,"lon":121.06893,"sm":442,"fm":442,"tm":442,"am":442,"md":0.0,"ls":"inside","ww":"Cadcadir","wn":"Cadcadir River","wd":0.03,"wp":[18.56091,121.06884],"wst":"matched","br":"Bacsay Cataraoan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3668},{"i":4932,"cid":"23OB0094","pid":"P00725940LZ","t":"Rehabilitation of Flood Mitigation Structure, Ilugin Creek at Barangay Pinagbuhatan, Pasig City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"AARCON BUILDERS","c":8377306.06,"abc":8819129.39,"fy":"2023","sd":"02/06/2023","cd":"2023-06-05","lat":14.554372,"lon":121.094842,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Ilugin","wn":"Ilugin River","wd":0.0,"wp":[14.55435,121.09481],"wst":"matched","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4981],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":925},{"i":4933,"cid":"22DH0012","pid":"P00620889LZ","t":"Construction of River Control along Sta. Cruz River, Sta. Cruz Section, Sta. Cruz, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":78406729.84,"abc":85885000.0,"fy":"2022","sd":"02/19/2022","cd":"2023-01-17","lat":14.27,"lon":121.420278,"sm":1376,"fm":1376,"tm":1376,"am":1376,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":414},{"i":4934,"cid":"23PK0032","pid":"P00726660LZ","t":"Construction (Continuation) of Sukiap (Kadjo) Flood Control along Chico River, Sta. 170 + 650 - Sta. 171 + 005 (RS), Sukiap, Tanglag, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":34288345.49,"abc":34300000.0,"fy":"2023","sd":"03/13/2023","cd":"2024-02-26","lat":17.36351,"lon":121.19846,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.04,"wp":[17.36347,121.19811],"wst":"matched","br":null,"len":355.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3669},{"i":4935,"cid":"24BI0058","pid":"P00843257LZ","t":"Construction of Flood Control and Drainage Structure along Magat River, Tuao South Section, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"DALCON CONSTRUCTION","c":89745000.0,"abc":89745000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-24","lat":16.5539,"lon":121.25269,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.24,"wp":[16.55452,121.25482],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[4519,4232,4329,4256,4439],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":6,"text":"6 contracts with consecutive numbers (24BI0055 to 24BI0060) cover the same site, together worth PHP 557,770,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":363},{"i":4936,"cid":"24C00516","pid":"P00845794LZ","t":"Construction of Flood Mitigation Structure including Road Dike, Malangaan Section (Upstream), Doña Remedios Trinidad, Bulacan","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"BULACAN","mu":"DOÑA REMEDIOS TRINIDAD (BULACAN)","deo":"Bulacan 3rd District Engineering Office","co":"TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC.","c":98999239.11,"abc":98999282.16,"fy":"2024","sd":"06/19/2024","cd":"2025-01-13","lat":14.9863,"lon":121.0691,"sm":529,"fm":529,"tm":529,"am":529,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3670},{"i":4937,"cid":"24OB0256","pid":"P00820558LZ","t":"Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 1)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":47414348.6,"abc":48999995.17,"fy":"2024","sd":"04/01/2024","cd":"2024-10-07","lat":14.58514,"lon":121.09489,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.05,"wp":[14.58498,121.09448],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3671},{"i":4938,"cid":"22PL0026","pid":"P00620808LZ","t":"Construction of Mega Dike Project along Chico River, Sta. 84 + 000 - Sta. 85 + 000 (Left Bank), Tabuk City, Kalinga","w":"Construction of Dike","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"JTM CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":57562739.0,"abc":57849803.74,"fy":"2022","sd":"03/21/2022","cd":"2023-08-01","lat":17.423317,"lon":121.42047,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.72,"wp":[17.42307,121.42725],"wst":"matched","br":null,"len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3672},{"i":4939,"cid":"22PK0016","pid":"P00621020LZ","t":"Construction of Sukiap Flood Control Structure along Chico River Sta. 170+350 - Sta. 170+650 (R.S.),Tanglag, Lubuagan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"LUBUAGAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BANGYAN 3D CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-04-25","lat":17.36278,"lon":121.1989,"sm":817,"fm":817,"tm":817,"am":817,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.06,"wp":[17.36253,121.19841],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3673},{"i":4940,"cid":"22PK0005","pid":"P00620485LZ","t":"Construction of Dao-angan Flood Control Structure, Sta. 141+960 - Sta. 142+110 (B.S.), Dao-angan, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"BALBALAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":14311781.71,"abc":14700000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-11-30","lat":17.48099,"lon":121.25273,"sm":125,"fm":125,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3674},{"i":4941,"cid":"24ED0016","pid":"P00823567LZ","t":"Construction of Pula River Control, Socorro, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL NORTE","mu":"SOCORRO (SURIGAO DEL NORTE)","deo":"Mindoro Oriental District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH / E.S.L. BUILDERS & PARTS SUPPLY","c":62724802.09,"abc":63700000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-20","lat":13.049167,"lon":121.421944,"sm":1472,"fm":1471,"tm":1472,"am":1472,"md":0.0,"ls":"inside","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":610.73,"text":"The record contradicts itself: the title and the pin point to Socorro, Oriental Mindoro, but the municipality field names Socorro, Surigao del Norte, 611 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":501},{"i":4942,"cid":"23DI0136","pid":"P00740646LZ","t":"Construction of Structure for River Protection Along Sta. Rosa River, (Near Puting Tulay), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"RVR3 CONSTRUCTION SUPPLY AND SERVICES / ORA ET LABORA CONSTRUCTION INC","c":47724808.83,"abc":49000000.0,"fy":"2023","sd":"06/27/2023","cd":"2024-04-12","lat":14.299967,"lon":121.095167,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":"River Protection Along Sta. Rosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3675},{"i":4943,"cid":"23DE0046","pid":"P00726751LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 6), Batangas City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-11-04","lat":13.76207,"lon":121.06911,"sm":180,"fm":180,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.06,"wp":[13.76238,121.06865],"wst":"matched","br":null,"len":null,"ph":"Section 6","dup":[4947],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 192,862,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1084},{"i":4944,"cid":"24DN0017","pid":"P00820933LZ","t":"Construction of Flood Control Structure along Malalim na Sapa, Barangay Batingan and Barangay Tatala, Binangonan, Rizal","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"RIZAL","mu":"BINANGONAN (RIZAL)","deo":"Rizal 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":15679986.09,"abc":15680000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-04-26","lat":14.476849,"lon":121.199146,"sm":206,"fm":206,"tm":206,"am":206,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batingan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3676},{"i":4945,"cid":"23BC0065","pid":"P00727272LZ","t":"Construction of Simayung River Control along Abulug River, Brgy. Simayung, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY / C.T. LEONCIO CONSTRUCTION & TRADING","c":67506525.33,"abc":67550000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-02","lat":18.38479,"lon":121.42201,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Simayung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Simayung","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3677},{"i":4946,"cid":"21OB0258","pid":"P00525747LZ","t":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 4A - River Improvement Works Along Upper Marikina River (Upstream of Marikina Bridge) Sta. 15+600 to Sta. 15+700, Right Bank, Marikina City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"City of Marikina","deo":"Metro Manila 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":45548215.67,"abc":48204029.72,"fy":"2021","sd":"02/08/2022","cd":"2022-10-05","lat":14.6536,"lon":121.0952,"sm":403,"fm":null,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Pasig-Marikina","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":100.0,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3678},{"i":4947,"cid":"21D00007","pid":"P00526304LZ","t":"Construction of Flood Control Structures along Calumpang River, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"Batangas City","deo":"Batangas 2nd District Engineering Office","co":"PHESCO, INCORPORATED","c":143862842.0,"abc":144750000.0,"fy":"2021","sd":"07/21/2021","cd":"2023-03-05","lat":13.762073,"lon":121.069111,"sm":180,"fm":null,"tm":180,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.06,"wp":[13.76239,121.06865],"wst":"matched","br":null,"len":null,"ph":null,"dup":[4943],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 192,862,842.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1000},{"i":4948,"cid":"21PK0013","pid":"P00525930LZ","t":"Construction of Mong-ol Flood Control Sta. 171+140 - Sta. 171+240 (R.S.), Balinciagao Norte, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"JBC BUILDERS","c":4858998.43,"abc":4900000.0,"fy":"2021","sd":"04/10/2022","cd":"2022-11-08","lat":17.3927,"lon":121.2,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":587},{"i":4949,"cid":"22OB0099","pid":"P00620362LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package II)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU","c":46525447.81,"abc":48999945.04,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":14.545614,"lon":121.069264,"sm":1112,"fm":1521,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3679},{"i":4950,"cid":"24BI0061","pid":"P00823342LZ","t":"Construction of Sta. Lucia Flood Control Structure along Lamut River, Barangay Sta. Lucia, Bagabag, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAGABAG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-09-01","lat":16.648948,"lon":121.253031,"sm":104,"fm":104,"tm":104,"am":104,"md":0.0,"ls":"inside","ww":"Lamut","wn":"Lamut River","wd":0.07,"wp":[16.64951,121.25268],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3680},{"i":4951,"cid":"23DI0116","pid":"P00740385LZ","t":"Construction of Structure for River Protection Along Malitlit Waterways, (Near Eton Road), Sta. Rosa City, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SANTA ROSA (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"LE BRON CONSTRUCTION","c":96427413.15,"abc":96500000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-12-12","lat":14.258492,"lon":121.095228,"sm":419,"fm":419,"tm":419,"am":419,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3681},{"i":4952,"cid":"24BC0086","pid":"P00825224LZ","t":"Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan","w":"Construction of Flood Mitigation Facility","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":48958625.47,"abc":49000000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-08-19","lat":18.388668,"lon":121.423565,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.07,"wp":[18.38844,121.42418],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3682},{"i":4953,"cid":"22PK0006","pid":"P00620484LZ","t":"Construction (Continuation) of Cagaluan Flood Control Structure, Sta. 163+870 - Sta. 164+070 (R.S.), Cagaluan, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PASIL (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":9525442.35,"abc":9800000.0,"fy":"2022","sd":"02/27/2022","cd":"2022-12-28","lat":17.39277,"lon":121.2001,"sm":1108,"fm":1108,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":null,"dup":[4956],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,219,836.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":247},{"i":4954,"cid":"22OB0098","pid":"P00620361LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package I)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":46549886.27,"abc":48999880.29,"fy":"2022","sd":"02/08/2022","cd":"2022-08-06","lat":14.545736,"lon":121.069341,"sm":1112,"fm":1521,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3683},{"i":4955,"cid":"23DI0109","pid":"P00742437LZ","t":"Construction of Structure for Riverbank Protection along Maulawin Waterways, Brgy. San Antonio, Los Banos, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MAR-VEL CONSTRUCTION & SUPPLY","c":98995447.0,"abc":99000000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-03-05","lat":14.173479,"lon":121.253144,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3684},{"i":4956,"cid":"22PK0055","pid":"P00620140LZ","t":"Construction of Gallang Flood Control Structure, Sta. 164+015 - Sta. 165+765 (L.S.), Balbalasang, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"BALBALAN (KALINGA)","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION / FIAT CONSTRUCTION SERVICES","c":88694393.45,"abc":90497700.0,"fy":"2022","sd":"03/29/2022","cd":"2023-08-15","lat":17.39277,"lon":121.2001,"sm":125,"fm":125,"tm":125,"am":1108,"md":3.96,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1750.0,"ph":null,"dup":[4953],"run":[],"cl":[],"L":"records","s":76,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.7,"value":3.96,"text":"The pin is 4.0 km outside Balbalan, Kalinga, the nearest municipality the record claims. It falls in Pasil, Kalinga.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 98,219,836.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":30},{"i":4957,"cid":"24OG0054","pid":"P00820036LZ","t":"Construction of Flood Control Structure at Lumban Creek, Barangay Matandang Balara, Quezon City (Phase IV)","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"QUEZON CITY","mu":"QUEZON CITY (METROPOLITAN MANILA)","deo":"Quezon City 2nd District Engineering Office","co":"MRB11  CONSTRUCTION CORPORATION (FORMERLY:MRB CONS","c":84919418.15,"abc":84919921.29,"fy":"2024","sd":"02/15/2024","cd":"2024-12-13","lat":14.66625,"lon":121.095585,"sm":1191,"fm":1191,"tm":1191,"am":403,"md":0.06,"ls":"boundary","ww":"Lumban","wn":"Lumban Creek","wd":0.15,"wp":[14.66654,121.09697],"wst":"matched","br":"Matandang Balara","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3685},{"i":4958,"cid":"22EI0042","pid":"P00632939LZ","t":"Construction of River Control at Sitio Puyuhan, Barangay Santa Teresita, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":10573646.88,"abc":10889469.35,"fy":"2022","sd":"04/13/2022","cd":"2022-09-09","lat":12.521944,"lon":121.423611,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Teresita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3686},{"i":4959,"cid":"23BI0017","pid":"P00726144LZ","t":"Rehabilitation of Flood Control along Sta. Cruz River, Barat Section, Bambang, Nueva Vizcaya","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"BAMBANG (NUEVA VIZCAYA)","deo":"Nueva Vizcaya District Engineering Office","co":"J.E.L. CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-10-21","lat":16.376461,"lon":121.069344,"sm":142,"fm":142,"tm":142,"am":142,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":"Sta. Cruz River","wd":0.48,"wp":[16.37976,121.06639],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3687},{"i":4960,"cid":"21PK0018","pid":"P00525935LZ","t":"Continuation of Cagaluan Flood Control Sta. 164+070 - Sta. 164+270 (L.S.), Cagaluan, Pasil, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Pasil","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":9506591.63,"abc":9800000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-16","lat":17.393763,"lon":121.200388,"sm":1108,"fm":null,"tm":1108,"am":1108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3688},{"i":4961,"cid":"21PK0022","pid":"P00525942LZ","t":"Construction of Dao-angan Bridge Flood Control Sta. 141+900 - Sta. 141+960 (B.S.), Dao-angan, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Balbalan","deo":"Upper Kalinga District Engineering Office","co":"BHM CONSTRUCTION","c":9563952.77,"abc":9800000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-11-30","lat":17.481584,"lon":121.253303,"sm":125,"fm":null,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":60.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3689},{"i":4962,"cid":"23OB0065","pid":"P00725936LZ","t":"Construction of Box Culvert along Eastbank Road Open Channel, Pasig City","w":"Construction of Flood Mitigation Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"816 EMBER CONSTRUCTION CORPORATION","c":4649672.91,"abc":4899756.42,"fy":"2023","sd":"02/06/2023","cd":"2023-07-20","lat":14.584677,"lon":121.095752,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Eastbank Road Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3690},{"i":4963,"cid":"24OB0166","pid":"P00821428LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package III)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION","c":48000133.62,"abc":48999690.81,"fy":"2024","sd":"02/12/2024","cd":"2024-08-09","lat":14.546101,"lon":121.069396,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package III","dup":[],"run":[4970,4906,4917],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OB0166 to 24OB0169) cover the same site, together worth PHP 191,991,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":563},{"i":4964,"cid":"24ED0069","pid":"P00825135LZ","t":"Construction of River Control Structure along Mag-Asawang Tubig River Sitio Pantaunan, Brgy. Bagong Buhay, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":96499892.6,"abc":98000000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-19","lat":13.212778,"lon":121.200833,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-Asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.33,"wp":[13.21145,121.19808],"wst":"matched","br":"Bagong Buhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3691},{"i":4965,"cid":"23DI0041","pid":"P00737521LZ","t":"Construction of Drainage, Barangay Bayog, Los Baños, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LOS BAÑOS (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"JA.VI CONSTRUCTION","c":6878007.25,"abc":6930000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-09-06","lat":14.188611,"lon":121.253333,"sm":813,"fm":813,"tm":813,"am":813,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3692},{"i":4966,"cid":"24OB0083","pid":"P00820076LZ","t":"Construction of Slope Protection along Ilugin Creek, Pasig City (Package 1)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":94280000.0,"abc":96499363.58,"fy":"2024","sd":"02/13/2024","cd":"2024-12-01","lat":14.554041,"lon":121.095793,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Ilugin","wn":"Ilugin River","wd":0.01,"wp":[14.55411,121.09575],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3693},{"i":4967,"cid":"24ED0125","pid":"P00846100LZ","t":"Construction of Mag-asawang Tubig River Control along Brgy. Pinagsabangan II, Naujan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":19799901.48,"abc":19800000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-05-21","lat":13.271389,"lon":121.256667,"sm":1017,"fm":1017,"tm":1017,"am":1017,"md":0.0,"ls":"inside","ww":"Mag-asawang Tubig","wn":"Mag-asawang Tubig River","wd":0.02,"wp":[13.2712,121.25654],"wst":"matched","br":"Pinagsabangan II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3694},{"i":4968,"cid":"24DI0060","pid":"P00839622LZ","t":"Construction of Drainage Canal System, Barangay Landayan, San Pedro, Laguna","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"CITY OF SAN PEDRO (LAGUNA)","deo":"Laguna 2nd District Engineering Office","co":"MICLOVER GENERAL CONSTRUCTION & IRON WORKS","c":4864617.0,"abc":4950000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-09","lat":14.347872,"lon":121.069431,"sm":418,"fm":418,"tm":418,"am":418,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Landayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3695},{"i":4969,"cid":"21PK0009","pid":"P00525928LZ","t":"Construction of Balbalan Proper Flood Control Sta. 145+200 - Sta. 145+250 (B.S), Balbalan Proper, Balbalan, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"Balbalan","deo":"Upper Kalinga District Engineering Office","co":"SALTAN RIVER CORPORATION","c":4828417.94,"abc":4900000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-08-10","lat":17.442862,"lon":121.201738,"sm":125,"fm":null,"tm":125,"am":125,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":50.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3696},{"i":4970,"cid":"24OB0167","pid":"P00821429LZ","t":"Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package IV)","w":"Construction of Slope Protection Structure","rg":"National Capital Region","pv":"PATEROS","mu":"PATEROS (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ZYRE TRADING AND CONSTRUCTION","c":47995260.28,"abc":48999736.94,"fy":"2024","sd":"02/12/2024","cd":"2024-10-08","lat":14.546451,"lon":121.069446,"sm":1112,"fm":1112,"tm":1112,"am":1112,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package IV","dup":[],"run":[4963,4906,4917],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24OB0166 to 24OB0169) cover the same site, together worth PHP 191,991,119.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":564},{"i":4971,"cid":"23OB0407","pid":"P00727229LZ","t":"Improvement Marikina River at Sta. 16 + 470 to Sta. 17 + 490, Marikina City","w":"Construction of Flood Mitigation Facility","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC. / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)","c":93057109.56,"abc":97999668.18,"fy":"2023","sd":"06/30/2023","cd":"2024-02-24","lat":14.659433,"lon":121.096017,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.0,"wp":[14.65944,121.09605],"wst":"matched","br":null,"len":1020.0,"ph":null,"dup":[],"run":[4670,4130],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23OB0406 to 23OB0408) cover the same site, together worth PHP 279,083,453.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":364},{"i":4972,"cid":"22OB0096","pid":"P00620360LZ","t":"Construction of Drainage System Including Laterals at Brgy. Sto. Rosario Kanluran, Pateros Metro Manila","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"PATEROS","mu":"TAGUIG CITY (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"HONY TRADING & CONSTRUCTION","c":19600000.0,"abc":19599743.94,"fy":"2022","sd":"02/08/2022","cd":"2022-07-02","lat":14.551368,"lon":121.06956,"sm":1521,"fm":1521,"tm":null,"am":1112,"md":0.98,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Rosario Kanluran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3697},{"i":4973,"cid":"22DD0001","pid":"P00620884LZ","t":"Construction of Revetment along Malaking Ilog River, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-12-11","lat":13.83391,"lon":121.42377,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Malaking Ilog","wn":"Malaking Ilog","wd":34.57,"wp":[13.8567,121.10482],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3698},{"i":4974,"cid":"24DE0113","pid":"P00846034LZ","t":"Construction of River Slope Protection, Sitio Laurel, Barangay Malabrigo, Lobo, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"LOBO (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"MATRICS CONSTRUCTION","c":14850000.0,"abc":14850000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-08-02","lat":13.607536,"lon":121.257274,"sm":803,"fm":803,"tm":803,"am":803,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malabrigo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3699},{"i":4975,"cid":"23DE0049","pid":"P00727370LZ","t":"Construction of Flood Control Structure along Calumpang River (Section 6), Batangas City Phase, 2","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"BATANGAS CITY (CAPITAL) (BATANGAS)","deo":"Batangas 2nd District Engineering Office","co":"VICMAR CONSTRUCTION, INC.","c":31430560.0,"abc":31430560.0,"fy":"2023","sd":"03/03/2023","cd":"2023-11-15","lat":13.76313,"lon":121.06979,"sm":180,"fm":180,"tm":null,"am":180,"md":0.0,"ls":"inside","ww":"Calumpang","wn":"Calumpang River","wd":0.05,"wp":[13.7635,121.06952],"wst":"matched","br":null,"len":null,"ph":"Section 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3700},{"i":4976,"cid":"21BC0070","pid":"P00526280LZ","t":"Reconstruction of Canayun-Sirit-Dana-ili Flood Control Along Abulug River , Abulug, Cagayan Sta. 12+700 - Sta. 12+860, Sta. 13+220 - Sta. 13+300 (L/S)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Abulug","deo":"Cagayan 2nd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/06/2021","cd":"2023-01-12","lat":18.419722,"lon":121.424166,"sm":3,"fm":null,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Canayun-Sirit-Dana-ili Flood Control Along Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3701},{"i":4977,"cid":"23BJ0031","pid":"P00725676LZ","t":"Construction of Flood Control along Benay River, Bagumbayan Section, Dupax del Sur, Nueva Vizcaya","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"DUPAX DEL SUR (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":96490357.25,"abc":96500000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-10-13","lat":16.29027,"lon":121.09605,"sm":544,"fm":544,"tm":544,"am":544,"md":0.0,"ls":"inside","ww":"Benay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3702},{"i":4978,"cid":"24OB0328","pid":"P00823235LZ","t":"Improvement of Marikina River, Barangay Tumana, Marikina City (Phase 2)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"L.R. TIQUI BUILDERS, INC.","c":94547887.26,"abc":96499954.82,"fy":"2024","sd":"04/01/2024","cd":"2024-09-02","lat":14.658234,"lon":121.096138,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":"Marikina","wn":"Marikina River","wd":0.01,"wp":[14.65824,121.09619],"wst":"matched","br":"Tumana","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3703},{"i":4979,"cid":"23DD0200","pid":"P00742405LZ","t":"Construction (Completion) of Drainage System, Brgy. Calansayan, San Jose, Batangas","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JOSE (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP","c":2880900.0,"abc":2970000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-06-29","lat":13.85081,"lon":121.0963,"sm":1299,"fm":1299,"tm":1299,"am":1299,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calansayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3704},{"i":4980,"cid":"24OB0257","pid":"P00820559LZ","t":"Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 2)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":47414632.39,"abc":48999824.54,"fy":"2024","sd":"04/01/2024","cd":"2024-10-07","lat":14.58264,"lon":121.09651,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.08,"wp":[14.58224,121.09592],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3705},{"i":4981,"cid":"23OB0078","pid":"P00725961LZ","t":"Rehabilitation of Drainage System along Interior Roads Villa Alegre, Barangay Pinagbuhatan and vicinity, Pasig City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS","c":13497696.0,"abc":14209791.94,"fy":"2023","sd":"02/06/2023","cd":"2023-08-04","lat":14.558207,"lon":121.096591,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbuhatan","len":null,"ph":null,"dup":[],"run":[4412,4429,4899,4189,4854,4190,4161,4133],"cl":[4133,4149,4161,4179,4184,4188,4189,4190,4223,4412,4429,4564,4854,4884,4899,4932],"L":"field","s":44,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":9,"text":"9 contracts with consecutive numbers (23OB0073 to 23OB0083) cover the same site, together worth PHP 77,246,563.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.43,"value":17,"text":"17 separate contracts name Barangay Pinagbuhatan (2021 to 2024), totalling PHP 193,818,925.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":159},{"i":4982,"cid":"22OB0337","pid":"P00639407LZ","t":"Construction of Drainage Outfall, Barangay Tumana, Marikina City","w":"Construction of Drainage Structure","rg":"National Capital Region","pv":"MARIKINA CITY","mu":"CITY OF MARIKINA (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"STAR WILLIAM CONSTRUCTION / W. GOMEZ TRADING AND CONSTRUCTION","c":46525618.35,"abc":48999975.37,"fy":"2022","sd":"03/24/2022","cd":"2023-02-16","lat":14.656675,"lon":121.096619,"sm":403,"fm":403,"tm":403,"am":403,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3706},{"i":4983,"cid":"23DD0227","pid":"P00726929LZ","t":"Construction of Revetment along Malaking Ilog River (Tipaz Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-02-01","lat":13.8357,"lon":121.42428,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Malaking Ilog","wn":"Malaking Ilog","wd":34.61,"wp":[13.8567,121.10482],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3707},{"i":4984,"cid":"21BC0061","pid":"P00525950LZ","t":"Reconstruction of Canayun-Sirit-Dana-ili Flood Control Along Abulug River , Abulug,Cagayan Sta. 12+860 - Sta.12+980(L/S)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Abulug","deo":"Cagayan 2nd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/26/2021","cd":"2022-09-09","lat":18.421388,"lon":121.424444,"sm":3,"fm":null,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Canayun-Sirit-Dana-ili Flood Control Along Abulug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":120.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3708},{"i":4985,"cid":"22DH0069","pid":"P00621295LZ","t":"Bank Improvement along Santa Cruz River, Pagsanjan Section, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":93604490.24,"abc":96500000.0,"fy":"2022","sd":"09/09/2022","cd":"2023-06-07","lat":14.256944,"lon":121.424722,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":"Santa Cruz","wn":"Santa Cruz River","wd":0.01,"wp":[14.25695,121.42468],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3709},{"i":4986,"cid":"22EI0013","pid":"P00621124LZ","t":"Construction of Pula River Control, Brgy. Sto. Niño Section, Sta. 0+000 - Sta. 0+468.8, Pinamalayan, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"PINAMALAYAN (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)","c":48999992.34,"abc":48999772.24,"fy":"2022","sd":"06/06/2022","cd":"2023-03-20","lat":13.049167,"lon":121.425,"sm":1140,"fm":1140,"tm":1140,"am":1140,"md":0.0,"ls":"inside","ww":"Pula","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Niño Section","len":468.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3710},{"i":4987,"cid":"23DD0225","pid":"P00727311LZ","t":"Construction of Revetment along Lawaya River (Balagbag Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"11-16 CONSTRUCTION / HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION","c":93605000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-02-19","lat":13.81226,"lon":121.425,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3711},{"i":4988,"cid":"24DH0019","pid":"P00820361LZ","t":"Construction of River Control along Sta. Cruz River, Sta. Cruz, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / JOBEL ENTERPRISES","c":77888626.76,"abc":77889010.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-05","lat":14.25944,"lon":121.42555,"sm":1376,"fm":1376,"tm":1376,"am":1061,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3712},{"i":4989,"cid":"22BC0024","pid":"P00620821LZ","t":"Construction of Canayun-Sirit-Dana-Ili Flood Control along Abulug River (Sta. 13+300 - Sta. 13+580) left side, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-06-09","lat":18.4254,"lon":121.425977,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.91,"wp":[18.42779,121.43422],"wst":"matched","br":null,"len":280.0,"ph":null,"dup":[],"run":[5009,5645,5552],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22BC0023 to 22BC0027) cover the same site, together worth PHP 243,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":217},{"i":4990,"cid":"22DH0013","pid":"P00620888LZ","t":"Construction of River Control along Sta. Cruz River, Pagsanjan Section, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"DMLC BUILDERS","c":83309816.57,"abc":85885000.0,"fy":"2022","sd":"02/19/2022","cd":"2022-12-09","lat":14.260833,"lon":121.426111,"sm":1061,"fm":1061,"tm":null,"am":1061,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3713},{"i":4991,"cid":"22BC0121","pid":"P00621529LZ","t":"Construction of Canayun-Sirit-Dana-ili Flood Control along abulug river, abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-09-30","lat":18.414542,"lon":121.426379,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3714},{"i":4992,"cid":"22DJ0049","pid":"P00631310LZ","t":"Construction of Slope Protection along Quiapo River, Barangay Pahinga Norte to Barangay Poblacion, Candelaria, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CANDELARIA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-20","lat":13.92137,"lon":121.42639,"sm":320,"fm":320,"tm":320,"am":320,"md":0.0,"ls":"inside","ww":"Quiapo","wn":"Quiapo River","wd":0.03,"wp":[13.92142,121.42665],"wst":"matched","br":"Pahinga Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3715},{"i":4993,"cid":"22DJ0001","pid":"P00620253LZ","t":"Construction of Slope Protection along Quiapo River, Brgy. Pahinga Norte to Brgy. Poblacion, Candelaria, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CANDELARIA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":77199999.9,"abc":77200000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-02-14","lat":13.9178,"lon":121.42657,"sm":320,"fm":320,"tm":320,"am":320,"md":0.0,"ls":"inside","ww":"Quiapo","wn":"Quiapo River","wd":0.01,"wp":[13.91777,121.42666],"wst":"matched","br":"Pahinga Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3716},{"i":4994,"cid":"23DH0100","pid":"P00745984LZ","t":"Repair / Rehabilitation of River Control along Sta. Cruz River, Sta. Cruz Section Barangay Patimbao ( Sta. 000+100 - Sta. 000+139 ) (RS) and Barangay Pagsawitan ( Sta. 000+548 - Sta. 000+596) (LS) UPSTREAM, Sta. Cruz, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"TRIPLE EAGLE CONSTRUCTION AND TRADING","c":18607381.02,"abc":19184200.0,"fy":"2023","sd":"11/23/2023","cd":"2024-06-19","lat":14.262132,"lon":121.426798,"sm":1376,"fm":1376,"tm":1376,"am":1061,"md":0.07,"ls":"boundary","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Patimbao","len":87.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3717},{"i":4995,"cid":"24CN0150","pid":"P00845950LZ","t":"Construction of Flood Control Structure, Brgy. Diteki, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"GERRA CONSTRUCTION INCORPORATED (FORMERLY: GERRA CONSTRUCTION)","c":49500000.0,"abc":49500000.0,"fy":"2024","sd":"05/30/2024","cd":"2025-03-17","lat":15.66458,"lon":121.42708,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Diteki","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3718},{"i":4996,"cid":"22DD0044","pid":"P00620883LZ","t":"Construction of Revetment along Lawaye River, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":93605000.0,"abc":96500000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-12-11","lat":13.81303,"lon":121.42723,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.0,"wp":[13.81304,121.42722],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3719},{"i":4997,"cid":"24BJ0006","pid":"P00820159LZ","t":"Construction of Flood Control along Benay River, Palabotan Section, Dupax del Sur, Nueva Vizcaya","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"NUEVA VIZCAYA","mu":"DUPAX DEL SUR (NUEVA VIZCAYA)","deo":"Nueva Vizcaya 2nd District Engineering Office","co":"BRG CONSTRUCTION","c":96492915.54,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-16","lat":16.282778,"lon":121.096667,"sm":544,"fm":544,"tm":544,"am":544,"md":0.0,"ls":"inside","ww":"Benay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3720},{"i":4998,"cid":"21PC0034","pid":"P00561652LZ","t":"Construction of Sinigpit Flood Control, Calanasan, Apayao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"APAYAO","mu":"Calanasan","deo":"Apayao 2nd District Engineering Office","co":"ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO.","c":4950000.0,"abc":4950000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-09-23","lat":18.52723,"lon":121.096812,"sm":294,"fm":null,"tm":294,"am":442,"md":0.58,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3721},{"i":4999,"cid":"22OB0071","pid":"P00620005LZ","t":"Bank Improvement along Eastbank, Manggahan Floodway, (Package 3), Pasig City","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"National Capital Region","pv":"PASIG CITY","mu":"CITY OF PASIG (METROPOLITAN MANILA)","deo":"Metro Manila 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":74455738.6,"abc":78399961.78,"fy":"2022","sd":"02/16/2022","cd":"2022-11-02","lat":14.582794,"lon":121.096837,"sm":412,"fm":412,"tm":412,"am":412,"md":0.0,"ls":"inside","ww":"Manggahan","wn":"Manggahan Floodway","wd":0.12,"wp":[14.5822,121.09596],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3722},{"i":5000,"cid":"22C00092","pid":"P00620495LZ","t":"Construction of Flood Mitigation Structure and Drainage System, Balitwak-San Isidro River Improvement Project, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":48249356.62,"abc":48249356.52,"fy":"2022","sd":"08/15/2022","cd":"2023-09-25","lat":15.728886,"lon":121.493458,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":"Balitwak-San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3723},{"i":5001,"cid":"22BG0004","pid":"P00621062LZ","t":"Construction of Pinacanauan River Flood Control Project, Brgy. Casala, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":39112266.88,"abc":39199997.04,"fy":"2022","sd":"02/14/2022","cd":"2022-11-18","lat":16.873767,"lon":122.106731,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3724},{"i":5002,"cid":"22CN0036","pid":"P00631162LZ","t":"Construction of Flood Mitigation Structures and Drainage System, Diteki-Aguang River Improvement Project, Baler and San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-19","lat":15.751989,"lon":121.495107,"sm":1320,"fm":1320,"tm":null,"am":1320,"md":0.0,"ls":"inside","ww":"Diteki-Aguang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3725},{"i":5003,"cid":"23JA0043","pid":"P00732476MN","t":"Construction of Drainage System, Barangay Talon-Talon, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"MI CONSTRUCTION","c":9897612.75,"abc":9800000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-20","lat":6.909525,"lon":122.109196,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talon-Talon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00996,"text":"Contract cost is 1.00% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":970},{"i":5004,"cid":"23EH0081","pid":"P00727194LZ","t":"Construction of Camantaya Flood Control, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"EMQ DESIGN & CONSTRUCTION","c":48992911.21,"abc":48999999.62,"fy":"2023","sd":"03/27/2023","cd":"2023-09-18","lat":12.47444,"lon":122.10972,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3726},{"i":5005,"cid":"22CN0103","pid":"P00631145LZ","t":"Construction of Drainage Canal, Brgy. 1, San Luis, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"RADIANCE TRADERS & BUILDERS","c":2820253.94,"abc":2940000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-07-08","lat":15.71565,"lon":121.50203,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3727},{"i":5006,"cid":"24BD0100","pid":"P00825227LZ","t":"Pinacanauan River Flood Management Projects, Caggay, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"D.J.D. CONSTRUCTION INC. (FORMERLY: D. J. D. CONSTRUCTION)","c":34300000.0,"abc":34300000.0,"fy":"2024","sd":"05/24/2024","cd":"2024-08-16","lat":17.6289,"lon":121.7403,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":19.31,"wp":[17.48262,121.83944],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3728},{"i":5007,"cid":"23JA0039","pid":"P00732473MN","t":"Construction of Flood Control Structure, Barangay Ayala, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"MCGABRIEL CONSTRUCTION","c":9768821.29,"abc":9800000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-18","lat":6.968056,"lon":121.946944,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ayala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3729},{"i":5008,"cid":"24EH0080","pid":"P00823569LZ","t":"Construction of Mainit (DS - LS), Flood Control Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":135100000.0,"abc":135099999.1,"fy":"2024","sd":"03/13/2024","cd":"2024-09-23","lat":12.4138,"lon":122.0161,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3730},{"i":5009,"cid":"22BC0023","pid":"P00621034LZ","t":"Construction of Canayun Flood Control along Abulug River (Sta. 9+057 - Sta. 9+257), Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-12-07","lat":18.39498,"lon":121.42726,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.39437,121.42799],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[4989,5645,5552],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22BC0023 to 22BC0027) cover the same site, together worth PHP 243,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":487},{"i":5010,"cid":"22BD0094","pid":"P00621499LZ","t":"Construction of Pinacanauan River Flood Control Structure, Nannarian, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"CREST92 CONSTRUCTION & DEVELOPMENT CORPORATION (FORMERLY: CREST CONSTRUCTION)","c":24125000.0,"abc":24125000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-13","lat":17.671408,"lon":121.803642,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":21.04,"wp":[17.48631,121.8492],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3731},{"i":5011,"cid":"22DM0107","pid":"P00639495LZ","t":"Construction of Flood Control Structure, Brgy. Biga, Pitogo, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PITOGO (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":49000000.0,"abc":48999734.61,"fy":"2022","sd":"04/04/2022","cd":"2022-09-20","lat":13.835346,"lon":122.111807,"sm":1148,"fm":1148,"tm":1148,"am":1148,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3732},{"i":5012,"cid":"22BD0049","pid":"P00621413LZ","t":"Pinacanauan River Flood Management Projects, Nannarian, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) / TJMT CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-04-04","lat":17.674883,"lon":121.804369,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":21.4,"wp":[17.48834,121.85759],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3733},{"i":5013,"cid":"24EI0020","pid":"P00821356LZ","t":"Construction of Bongabong River Control, Sta. 2+320 - Sta. 2+798(Downstream - Right Side), Barangay Anilao, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":67547158.37,"abc":67550000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-10-16","lat":12.688047,"lon":121.502642,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.23,"wp":[12.68864,121.50064],"wst":"matched","br":"Anilao","len":478.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3734},{"i":5014,"cid":"24BH0086","pid":"P00825050LZ","t":"Construction of Santos Flood Control Structures, Santos, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":115800000.0,"abc":115800000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-10-07","lat":16.454816,"lon":121.740604,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3735},{"i":5015,"cid":"22BF0025","pid":"P00631119LZ","t":"Construction of Siffu River Flood Control Structure (Sitio Pakak Section) Brgy. Nuesa, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":41655583.57,"abc":42140000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-08-21","lat":17.131324,"lon":121.6044,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.97,"wp":[17.13098,121.61355],"wst":"matched","br":"Nuesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3736},{"i":5016,"cid":"22BF0002","pid":"P00631116LZ","t":"Construction of Siffu River Flood Control Structure (Camaal Section Phase II), Brgy. Camaal, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":41506893.72,"abc":42140000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-02-13","lat":17.12736,"lon":121.6679,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.0,"wp":[17.12735,121.6679],"wst":"matched","br":"Camaal","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3737},{"i":5017,"cid":"23BA0025","pid":"P00737441LZ","t":"Construction of Diura Seawall, Sitio Diura, Barangay Uvoy, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"DEKM CONSTRUCTION","c":4935202.64,"abc":4941344.0,"fy":"2023","sd":"03/23/2023","cd":"2023-07-17","lat":20.421918,"lon":121.947667,"sm":876,"fm":876,"tm":876,"am":876,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Uvoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3738},{"i":5018,"cid":"23EH0018","pid":"P00726276LZ","t":"Construction of Sigkop Flood Mitigating Structure, Progreso Este, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48997359.66,"abc":48999999.09,"fy":"2023","sd":"02/21/2023","cd":"2023-11-06","lat":12.35194,"lon":122.01722,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3739},{"i":5019,"cid":"21BG0128","pid":"P00561450LZ","t":"Construction of Flood Control Structure along Cagayan River Bank - Barangay Canangan, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Angadanan","deo":"Isabela 3rd District Engineering Office","co":"JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) / JOHN-JANN CONST. AND SUPPLIES CORP.","c":95051116.94,"abc":96499997.66,"fy":"2021","sd":"11/29/2021","cd":"2022-12-06","lat":16.823776,"lon":121.805395,"sm":59,"fm":null,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.11,"wp":[16.82316,121.8062],"wst":"matched","br":"Canangan","len":null,"ph":null,"dup":[5026],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 190,100,298.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":771},{"i":5020,"cid":"24BD0070","pid":"P00821150LZ","t":"Cagayan River Flood Management Project, Gammad, Iguig, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"IGUIG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":34254387.95,"abc":34257500.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-21","lat":17.704232,"lon":121.742833,"sm":631,"fm":631,"tm":631,"am":631,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[17.70385,121.74174],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3740},{"i":5021,"cid":"23E00125","pid":"P00736056LZ","t":"Construction of Road Dike/Esplanade along Bongabong River, San Isidro-San Jose Section, Bongabong, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217122960.1,"abc":217124999.9,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.716143,"lon":121.504184,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.11,"wp":[12.71571,121.50508],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3741},{"i":5022,"cid":"24JA0023","pid":"P00833572MN","t":"Construction of Flood Mitigation Structure (Drainage), Barangay Ayala, Zamboanga City","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"CITYWEST BUILDERS AND SUPPLY","c":4132146.97,"abc":4502295.03,"fy":"2024","sd":"02/12/2024","cd":"2024-07-17","lat":6.957917,"lon":121.947864,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ayala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3742},{"i":5023,"cid":"22BH0139","pid":"P00639333LZ","t":"Construction of Villa Victoria Flood Control Structure, Brgy. Villa Victoria, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-01-06","lat":16.584483,"lon":121.670354,"sm":545,"fm":545,"tm":545,"am":673,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Victoria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3743},{"i":5024,"cid":"23DJ0094","pid":"P00740384LZ","t":"Construction of Seawall, Barangay Barra, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.","c":96499986.66,"abc":96500000.0,"fy":"2023","sd":"05/24/2023","cd":"2024-08-15","lat":13.8975,"lon":121.6059,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barra","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3744},{"i":5025,"cid":"24BG0088","pid":"P00825054LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Marannao, San Mariano, Isabela (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JAY ARCIE CONSTRUCTION AND SUPPLY","c":71892884.4,"abc":72374995.63,"fy":"2024","sd":"04/05/2024","cd":"2024-07-19","lat":16.958669,"lon":122.017867,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marannao","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3745},{"i":5026,"cid":"21BG0129","pid":"P00561452LZ","t":"Construction of Flood Control Structure along Cagayan River Bank - Barangay Viga, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Angadanan","deo":"Isabela 3rd District Engineering Office","co":"JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) / INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":95049181.1,"abc":96499998.6,"fy":"2021","sd":"11/29/2021","cd":"2022-12-06","lat":16.823776,"lon":121.805395,"sm":59,"fm":null,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.11,"wp":[16.82316,121.8062],"wst":"matched","br":"Viga","len":null,"ph":null,"dup":[5019],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 190,100,298.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":772},{"i":5027,"cid":"23JJ0005","pid":"P00721362MN","t":"Construction of Flood Control Structure at Piacan River, Sirawai, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SIRAWAI (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 4th District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/18/2023","cd":"2023-09-23","lat":7.52339,"lon":122.11321,"sm":1466,"fm":1466,"tm":1466,"am":1466,"md":0.0,"ls":"inside","ww":"Piacan","wn":"Piacan River","wd":0.01,"wp":[7.52331,122.11328],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3746},{"i":5028,"cid":"24BG0109","pid":"P00824868LZ","t":"Construction of Flood Control Structure along Cagayan River, Phase 3, Barangay Pappat, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":77159066.51,"abc":77199995.53,"fy":"2024","sd":"05/09/2024","cd":"2024-10-17","lat":16.745033,"lon":121.743461,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.18,"wp":[16.74623,121.74457],"wst":"matched","br":"Pappat","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3747},{"i":5029,"cid":"23E00124","pid":"P00736055LZ","t":"Construction of Road Dike/Esplanade along Bongabong River, Anilao-Mina de Oro Section, Bongabong, Oriental Mindoro","w":"Construction of Dike","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":217123307.0,"abc":217124999.9,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":12.7156,"lon":121.5048,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.03,"wp":[12.71558,121.50506],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3748},{"i":5030,"cid":"24BH0222","pid":"P00843220LZ","t":"Construction of Addalam Flood Control Structure, Purok 4, barangay Addalam, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96452294.94,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-12-31","lat":16.521309,"lon":121.671839,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Addalam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3749},{"i":5031,"cid":"23BC0098","pid":"P00742297LZ","t":"Construction of Centro Lasam Flood Control Along Zinundungan River, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":48904555.85,"abc":49500000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-01-17","lat":18.069722,"lon":121.6075,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":"Lasam Flood Control Along Zinundungan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3750},{"i":5032,"cid":"23CN0172","pid":"P00740581LZ","t":"Construction of Seawall (Phase 1), Minanga, Casiguran, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"CASIGURAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"06/20/2023","cd":"2023-11-20","lat":16.271417,"lon":122.113694,"sm":346,"fm":346,"tm":346,"am":346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3751},{"i":5033,"cid":"21B00010","pid":"P00526278LZ","t":"Construction of Flood Control System, Package 2, Sta. 0+296-Sta.0+582 (Upstream), Balasig, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":74882404.0,"abc":75144928.0,"fy":"2021","sd":"08/02/2021","cd":"2022-09-15","lat":17.3925,"lon":121.805754,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":286.0,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3752},{"i":5034,"cid":"22EH0006","pid":"P00631320LZ","t":"Construction of Flood Mitigation Structure along Panique River (Phase 2), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":42098832.22,"abc":42139999.5,"fy":"2022","sd":"02/23/2022","cd":"2022-09-21","lat":12.4742,"lon":122.0186,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":"Panique","wn":"Panique River","wd":0.04,"wp":[12.47388,122.01857],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3753},{"i":5035,"cid":"23BA0004","pid":"P00726109LZ","t":"Construction of Guardwall along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd (S00016BN) - K0005 + 010 - K0005 + 090, K0015 + 452 - K0015 + 783, Ivana, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"IVANA (BATANES)","deo":"Batanes District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":29362020.0,"abc":29362020.0,"fy":"2023","sd":"03/06/2023","cd":"2024-03-15","lat":20.423127,"lon":121.947999,"sm":656,"fm":656,"tm":656,"am":876,"md":1.66,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3754},{"i":5036,"cid":"22CN0115","pid":"P00631157LZ","t":"Construction of Flood Control Structure, Brgy. Sapangkawayan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-07-17","lat":15.84749,"lon":121.50516,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sapangkawayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3755},{"i":5037,"cid":"24DK0028","pid":"P00820287LZ","t":"Construction of Agos RIS Water Management Flood Control Project of Agos River, Gen. Nakar, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL NAKAR (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS)","c":51467062.5,"abc":51467310.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-08","lat":14.741235,"lon":121.607596,"sm":577,"fm":577,"tm":577,"am":577,"md":0.0,"ls":"inside","ww":"Agos","wn":"Agos River","wd":0.1,"wp":[14.74108,121.60849],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3756},{"i":5038,"cid":"22DJ0071","pid":"P00620870LZ","t":"Construction of Iyam River Flood Control, Brgy. Cotta (Phase 3), Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JAICA CONST. CORP","c":96499996.87,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-04-19","lat":13.92118,"lon":121.60765,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Iyam","wn":"Iyam River","wd":0.09,"wp":[13.92195,121.60729],"wst":"matched","br":"Cotta","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3757},{"i":5039,"cid":"23BH0104","pid":"P00727110LZ","t":"Construction of barangay Divisoria Flood Control Structure, Sta. 0+000 - Sta. 0+350, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"NTL BUILDERS AND DEVELOPER","c":48999075.93,"abc":49000000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-08-16","lat":16.684613,"lon":121.608634,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Divisoria Flood Control Structure","len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3758},{"i":5040,"cid":"21DJ0079","pid":"P00526110LZ","t":"Construction of River Control, Brgy. 11, Lucena City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"Lucena City","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / WYDERWAYS BUILDERS AND SUPPLIES","c":39200000.0,"abc":39200000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-12-07","lat":13.94028,"lon":121.61,"sm":819,"fm":null,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"11","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":502},{"i":5041,"cid":"21DJ0057","pid":"P00526109LZ","t":"Construction of River Control, Brgy. Cotta (Phase II), Lucena City","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"Lucena City","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":39199999.98,"abc":39200000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-11-07","lat":13.92384,"lon":121.61002,"sm":819,"fm":null,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cotta","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3759},{"i":5042,"cid":"22DJ0149","pid":"P00620599LZ","t":"Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-03-15","lat":13.91677,"lon":121.61098,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.03,"wp":[13.91662,121.61077],"wst":"matched","br":"Cotta","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3760},{"i":5043,"cid":"22DJ0064","pid":"P00620598LZ","t":"Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JAICA CONST. CORP","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-21","lat":13.9171,"lon":121.61139,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.09,"wp":[13.91664,121.61076],"wst":"matched","br":"Cotta","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3761},{"i":5044,"cid":"23BF0019","pid":"P00726424LZ","t":"Construction of Siffu River Flood Control Project (Sitio Pakak Section), Sta. 0+000 - Sta. 0+400, Barangay Nuesa, Roxas, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"SIFFU ROCKS CONSTRUCTION / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":48246100.19,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-10-02","lat":17.132217,"lon":121.611582,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.25,"wp":[17.13098,121.61355],"wst":"matched","br":"Nuesa","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3762},{"i":5045,"cid":"24CN0098","pid":"P00844535LZ","t":"Construction of Drainage Canal, Brgy. Dianed, Dipaculao, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"VANMARVIL CONSTRUCTION","c":23638253.17,"abc":24125000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-12-15","lat":16.012056,"lon":121.671931,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dianed","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3763},{"i":5046,"cid":"24BH0013","pid":"P00821160LZ","t":"Construction of Barangay Palacian Flood Control Structure, Section 1, Barangay Palacian, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"NTL BUILDERS AND DEVELOPER","c":62722599.34,"abc":62725000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-06-18","lat":16.402174,"lon":121.744108,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palacian Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3764},{"i":5047,"cid":"23BF0061","pid":"P00742304LZ","t":"Construction of Mallig River Flood Control Project (Maligaya Section), Mallig, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"MALLIG (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":49092711.12,"abc":49179460.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-05","lat":17.175703,"lon":121.612038,"sm":902,"fm":902,"tm":902,"am":902,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.04,"wp":[17.17536,121.61194],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3765},{"i":5048,"cid":"22DJ0147","pid":"P00620600LZ","t":"Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-07-11","lat":13.91637,"lon":121.61344,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.03,"wp":[13.91607,121.61353],"wst":"matched","br":"Cotta","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3766},{"i":5049,"cid":"23DJ0073","pid":"P00740379LZ","t":"Construction of Dumacaa River Flood Control (Package 8), Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JELCON-CONSTRUCTION AND TRADING CORPORATION","c":96499997.82,"abc":96500000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-04-19","lat":13.91649,"lon":121.61433,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.03,"wp":[13.91625,121.61437],"wst":"matched","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3767},{"i":5050,"cid":"23DJ0072","pid":"P00740380LZ","t":"Construction of Dumacaa River Flood Control (Package 9), Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":96499987.48,"abc":96500000.0,"fy":"2023","sd":"05/31/2023","cd":"2024-05-24","lat":13.91745,"lon":121.61629,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.03,"wp":[13.91727,121.61652],"wst":"matched","br":null,"len":null,"ph":"Package 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3768},{"i":5051,"cid":"22DJ0109","pid":"P00620596LZ","t":"Construction of Dumacaa River Flood Control, Brgy. 2, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"JAICA CONST. CORP","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-11-13","lat":13.949838,"lon":121.616709,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.0,"wp":[13.94983,121.61673],"wst":"matched","br":"2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3769},{"i":5052,"cid":"24BC0003","pid":"P00821190LZ","t":"Construction of Flood Control Structure along Cagayan River, Dungao Section, Sto. Niño, Cagayan (Package 1)","w":"Construction of Flood Mitigation Facility","rg":"Region II","pv":"CAGAYAN","mu":"SANTO NIÑO (FAIRE) (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION / VHT CAGAYAN BUILDERS CORPORATION","c":48237059.31,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-05","lat":17.960834,"lon":121.617242,"sm":1412,"fm":1412,"tm":1412,"am":1412,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.18,"wp":[17.96242,121.61778],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3770},{"i":5053,"cid":"24DJ0115","pid":"P00823502LZ","t":"Construction of Dumacaa River Flood Control Structure (Package 22), Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/29/2024","cd":"2025-03-24","lat":13.94218,"lon":121.61816,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.02,"wp":[13.9423,121.61831],"wst":"matched","br":null,"len":null,"ph":"Package 22","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3771},{"i":5054,"cid":"23BF0016","pid":"P00726441LZ","t":"Construction of Siffu River Flood Control Project (Sitio Caragsakan Section), Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":72374954.49,"abc":72375000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-01-15","lat":17.129544,"lon":121.61904,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.04,"wp":[17.12989,121.61882],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3772},{"i":5055,"cid":"22DJ0110","pid":"P00632906LZ","t":"Construction of Flood Control and Drainage Structure, Barangay Poblacion 9, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"JAICA CONST. CORP","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-15","lat":13.93097,"lon":121.61923,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 9","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3773},{"i":5056,"cid":"24BF0013","pid":"P00821217LZ","t":"Construction of Slope Protection Works for Cagayan River Basin, Siffu River, San Placido, Roxas, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96488772.99,"abc":96500000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-04-16","lat":17.136939,"lon":121.619304,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":22.6,"wp":[17.08593,121.82495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3774},{"i":5057,"cid":"22DJ0073","pid":"P00631306LZ","t":"Construction of Slope Protection along Dumacaa River, Barangay IX, Lucena City, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-07-12","lat":13.93126,"lon":121.61955,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.03,"wp":[13.93134,121.61981],"wst":"matched","br":"IX","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3775},{"i":5058,"cid":"21DJ0052","pid":"P00526444LZ","t":"Construction of Slope Protection along Dumacaa River, Brgy. 10, Lucena City, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"Lucena City","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-10-08","lat":13.92833,"lon":121.62,"sm":819,"fm":null,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumacaa","wn":"Dumacaa River","wd":0.04,"wp":[13.92844,121.6204],"wst":"matched","br":"10","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":456},{"i":5059,"cid":"23BF0001","pid":"P00735971LZ","t":"Construction of Flood Control Structure, Phase 2, Sta. 0+200 - Sta. 0+800, Barangay Kalabasa, Aurora, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"AURORA (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":48233662.14,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-07-17","lat":16.96629,"lon":121.62173,"sm":83,"fm":83,"tm":83,"am":83,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kalabasa","len":600.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3776},{"i":5060,"cid":"24BK0055","pid":"P00825238LZ","t":"Construction of Addalam River Flood Control, Upstream (Disiluad Section), Aglipay, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"AGLIPAY (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":34247245.44,"abc":34300000.0,"fy":"2024","sd":"04/24/2024","cd":"2024-09-15","lat":16.473262,"lon":121.622027,"sm":7,"fm":7,"tm":7,"am":7,"md":0.0,"ls":"inside","ww":"Addalam","wn":"Addalam River","wd":0.01,"wp":[16.47314,121.62208],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3777},{"i":5061,"cid":"24BF0032","pid":"P00824888LZ","t":"Construction of Siffu River Flood Control Project, Barangay Rizal Phase II, Sta. 2+000 - Sta. 2+800, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":96165781.02,"abc":96500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-07-29","lat":17.138574,"lon":121.622473,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.13884,121.62261],"wst":"matched","br":"Rizal Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3778},{"i":5062,"cid":"23B00058","pid":"P00725682LZ","t":"Construction of Slope Protection Works for Cagayan River Basin, Siffu River at Anao, Roxas, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":190598720.8,"abc":190750000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-02-15","lat":17.139019,"lon":121.623506,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":22.22,"wp":[17.08593,121.82495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3779},{"i":5063,"cid":"22DK0060","pid":"P00621477LZ","t":"Construction of Flood Control Structures along Agos River, General Nakar, Quezon Side, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL NAKAR (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR","c":67379438.9,"abc":67550000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-09-29","lat":14.75452,"lon":121.62454,"sm":577,"fm":577,"tm":577,"am":577,"md":0.0,"ls":"inside","ww":"Agos","wn":"Agos River","wd":0.38,"wp":[14.75139,121.62303],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3780},{"i":5064,"cid":"22BC0083","pid":"P00631108LZ","t":"Construction of Malinta Flood Control Structure along Zinundungan River, Malinta, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"OCP CONSTRUCTION","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-11-26","lat":18.09324,"lon":121.62545,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":"Zinundungan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3781},{"i":5065,"cid":"22CN0109","pid":"P00631151LZ","t":"Construction of Flood Control Structure, Brgy. Diarabasin, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-10-05","lat":15.966837,"lon":121.626185,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Diarabasin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3782},{"i":5066,"cid":"22DK0065","pid":"P00621580LZ","t":"Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package Q)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"PHESCO, INCORPORATED","c":96499996.64,"abc":96500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-10-20","lat":14.75053,"lon":121.62654,"sm":643,"fm":643,"tm":643,"am":577,"md":0.19,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.08,"wp":[14.7499,121.62623],"wst":"matched","br":null,"len":null,"ph":"Package Q","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3783},{"i":5067,"cid":"22BF0076","pid":"P00621160LZ","t":"Construction of Mallig River Flood Control Project (Olango Section), Mallig, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"MALLIG (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":96467970.82,"abc":96500000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-05-24","lat":17.19108,"lon":121.62873,"sm":902,"fm":902,"tm":902,"am":902,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":1.62,"wp":[17.17646,121.6285],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5088,5581],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0075 to 22BF0077) cover the same site, together worth PHP 289,416,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":284},{"i":5068,"cid":"22DK0095","pid":"P00621579LZ","t":"Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package P)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"PHESCO, INCORPORATED","c":96499799.98,"abc":96500000.0,"fy":"2022","sd":"05/17/2022","cd":"2022-10-20","lat":14.75125,"lon":121.6291,"sm":643,"fm":643,"tm":643,"am":577,"md":0.36,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.22,"wp":[14.74926,121.62925],"wst":"matched","br":null,"len":null,"ph":"Package P","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3784},{"i":5069,"cid":"23BF0072","pid":"P00742305LZ","t":"Construction of Drainage Canal, Brgy District 3, San Manuel, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MANUEL (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"619 BUILDERS CONSTRUCTION CORPORATION","c":9885543.3,"abc":9900000.0,"fy":"2023","sd":"05/03/2023","cd":"2024-01-21","lat":17.024372,"lon":121.63019,"sm":1324,"fm":1324,"tm":1324,"am":1324,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3785},{"i":5070,"cid":"24BK0056","pid":"P00825237LZ","t":"Construction of Addalam River Flood Control, Downstream (Disiluad Section), Aglipay, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"AGLIPAY (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":33265659.77,"abc":34300000.0,"fy":"2024","sd":"04/24/2024","cd":"2024-07-30","lat":16.468526,"lon":121.630573,"sm":7,"fm":7,"tm":7,"am":7,"md":0.0,"ls":"inside","ww":"Addalam","wn":"Addalam River","wd":0.04,"wp":[16.46827,121.63036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3786},{"i":5071,"cid":"22BB0014","pid":"P00621023LZ","t":"Construction of Flood Control Project along Cagayan River Basin Brgy. Centro 9 to Brgy. Punta River Control, Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"APARRI (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"E. GUADIZ CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/02/2022","cd":"2023-10-03","lat":18.356721,"lon":121.631524,"sm":68,"fm":68,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.67,"wp":[18.35459,121.62561],"wst":"matched","br":"Centro 9","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3787},{"i":5072,"cid":"23D00101","pid":"P00726591LZ","t":"Construction of Flood Control along Agos River, Barangay Ilog, Infanta, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"DJB CONSTRUCTION SERVICES","c":91934349.67,"abc":96500000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-11-14","lat":14.752408,"lon":121.632469,"sm":643,"fm":643,"tm":643,"am":577,"md":0.28,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.21,"wp":[14.75073,121.63339],"wst":"matched","br":"Ilog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3788},{"i":5073,"cid":"22BH0141","pid":"P00637013LZ","t":"Construction of Flood Control Structure, Ipil, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96494743.04,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-02-27","lat":16.695023,"lon":121.632915,"sm":545,"fm":545,"tm":545,"am":1285,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3789},{"i":5074,"cid":"22DJ0016","pid":"P00631307LZ","t":"Construction of Slope Protection along Dumuklong River, Barangay Kanlurang Mayao, Lucena City, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-17","lat":13.96004,"lon":121.63312,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Dumuklong","wn":"Dumoklong River","wd":0.01,"wp":[13.96004,121.633],"wst":"matched","br":"Kanlurang Mayao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3790},{"i":5075,"cid":"23D00095","pid":"P00727318LZ","t":"Construction of Flood Control along Agos River, Phase 1, Infanta, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"DJB CONSTRUCTION SERVICES","c":91287809.4,"abc":96500000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-11-14","lat":14.753206,"lon":121.633819,"sm":643,"fm":643,"tm":643,"am":577,"md":0.18,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.11,"wp":[14.75302,121.63484],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3791},{"i":5076,"cid":"22BF0081","pid":"P00639336LZ","t":"Rehabilitation of Drainage Structure (Brgy. District 2), San Manuel, Isabela","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MANUEL (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"619 BUILDERS CONSTRUCTION CORPORATION / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":69023570.25,"abc":69074700.0,"fy":"2022","sd":"06/09/2022","cd":"2023-04-11","lat":17.021952,"lon":121.634475,"sm":1324,"fm":1324,"tm":1324,"am":1324,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3792},{"i":5077,"cid":"24DJ0039","pid":"P00839639LZ","t":"Construction of Flood Control (Riprap), KMNAI, Barangay Kanlurang Mayao, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"JAICA CONST. CORP","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-04-12","lat":13.94361,"lon":121.63465,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kanlurang Mayao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3793},{"i":5078,"cid":"22BF0073","pid":"P00621156LZ","t":"Construction of Siffu River Flood Control Project (Rang-Ayan Section), Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"SIFFU ROCKS CONSTRUCTION / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":96499886.84,"abc":96500000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-04-18","lat":17.126959,"lon":121.634786,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.1,"wp":[17.12645,121.63554],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5796,5091],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0072 to 22BF0074) cover the same site, together worth PHP 289,306,945.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":218},{"i":5079,"cid":"23D00096","pid":"P00727317LZ","t":"Construction of Flood Control along Agos River, Phase 2, Infanta, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION)","c":77002093.09,"abc":77200000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-09","lat":14.754511,"lon":121.634992,"sm":643,"fm":643,"tm":643,"am":577,"md":0.08,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.01,"wp":[14.75449,121.63512],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[5080],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,550,741.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":812},{"i":5080,"cid":"23D00191","pid":"P00726947LZ","t":"Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structures along Agos River, Infanta, Quezon (Package L), Phase 2, Brgy. Pilaway, Infanta, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"JUNTEREAL INDUSTRIAL AND DEVELOPMENT CORPORATION","c":67548647.45,"abc":67550000.0,"fy":"2023","sd":"08/07/2023","cd":"2024-05-17","lat":14.754511,"lon":121.634992,"sm":643,"fm":643,"tm":643,"am":577,"md":0.08,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.01,"wp":[14.75449,121.63512],"wst":"matched","br":"Pilaway","len":null,"ph":"Package L","dup":[5079],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,550,741.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":842},{"i":5081,"cid":"23D00139","pid":"P00726937LZ","t":"Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package A)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":192997900.4,"abc":193000000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-04-09","lat":14.756314,"lon":121.635636,"sm":643,"fm":643,"tm":643,"am":577,"md":0.01,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.02,"wp":[14.75634,121.63548],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3794},{"i":5082,"cid":"23D00140","pid":"P00726936LZ","t":"Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package B)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"INFANTA (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":192997440.9,"abc":193000000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-04-09","lat":14.759767,"lon":121.636056,"sm":643,"fm":643,"tm":643,"am":577,"md":0.01,"ls":"boundary","ww":"Agos","wn":"Agos River","wd":0.07,"wp":[14.75948,121.63667],"wst":"matched","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3795},{"i":5083,"cid":"24BF0046","pid":"P00825232LZ","t":"Construction of Slope Protection in Cagayan River Basin, Siffu River at Anao, Roxas, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RR BUILDERS / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48968530.26,"abc":49000000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-09-01","lat":17.129138,"lon":121.637789,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":20.48,"wp":[17.08593,121.82495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3796},{"i":5084,"cid":"23D00102","pid":"P00727316LZ","t":"Construction of Flood Control along Agos River, Barangay Banglos, General Nakar, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL NAKAR (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR / MOTIONTRADE DEVELOPMENT CORPORATION","c":96499720.67,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-01-11","lat":14.76601,"lon":121.63944,"sm":577,"fm":577,"tm":577,"am":577,"md":0.0,"ls":"inside","ww":"Agos","wn":"Agos River","wd":0.1,"wp":[14.76535,121.64013],"wst":"matched","br":"Banglos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3797},{"i":5085,"cid":"23BF0045","pid":"P00735970LZ","t":"Construction of Flood Control Structure, Phase 2, Sta. 0+200 - Sta. 0+800, Barangay Camarungayan, Aurora, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"AURORA (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":47929443.39,"abc":47929460.0,"fy":"2023","sd":"03/13/2023","cd":"2023-07-26","lat":16.976605,"lon":121.639588,"sm":83,"fm":83,"tm":83,"am":83,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camarungayan","len":600.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3798},{"i":5086,"cid":"23DJ0080","pid":"P00740649LZ","t":"Construction of Seawall, Barangay Talao-Talao, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":19599995.57,"abc":19600000.0,"fy":"2023","sd":"05/09/2023","cd":"2023-10-10","lat":13.90742,"lon":121.64218,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talao-Talao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3799},{"i":5087,"cid":"22BH0115","pid":"P00620145LZ","t":"Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN ISIDRO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":76703990.0,"abc":76703990.0,"fy":"2022","sd":"04/13/2022","cd":"2022-11-10","lat":16.73876,"lon":121.64223,"sm":1285,"fm":1285,"tm":1285,"am":1285,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":595.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3800},{"i":5088,"cid":"22BF0075","pid":"P00621159LZ","t":"Construction of Mallig River Flood Control Project (Holy Friday Section), Mallig, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"MALLIG (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY / MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":96448972.94,"abc":96500000.0,"fy":"2022","sd":"06/08/2022","cd":"2022-12-14","lat":17.171117,"lon":121.64253,"sm":902,"fm":902,"tm":902,"am":1222,"md":0.01,"ls":"boundary","ww":"Mallig","wn":"Mallig River","wd":0.03,"wp":[17.17106,121.6428],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5067,5581],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0075 to 22BF0077) cover the same site, together worth PHP 289,416,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":285},{"i":5089,"cid":"23BB0091","pid":"P00726672LZ","t":"Repair/Restoration of Damaged Concrete Revetment at Cagayan River Revetment 2, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":39190000.0,"abc":39200000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-04-29","lat":18.06584,"lon":121.64296,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.3,"wp":[18.06677,121.6403],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3801},{"i":5090,"cid":"24BK0030","pid":"P00820791LZ","t":"Construction of San Francisco CIS Gabion Protection Works along Main Canal, Aglipay, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"AGLIPAY (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":19594188.04,"abc":19600000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-11","lat":16.44325,"lon":121.6431,"sm":7,"fm":7,"tm":7,"am":7,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3802},{"i":5091,"cid":"22BF0074","pid":"P00621157LZ","t":"Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":96495711.51,"abc":96500000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-04-17","lat":17.12706,"lon":121.64316,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.0,"wp":[17.12707,121.64316],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5796,5078],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0072 to 22BF0074) cover the same site, together worth PHP 289,306,945.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":286},{"i":5092,"cid":"22BB0015","pid":"P00621024LZ","t":"Construction of Flood Control Structure along Cagayan River, Centro Norte Section 1, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":24499913.26,"abc":24500000.0,"fy":"2022","sd":"02/02/2022","cd":"2023-06-11","lat":18.06729,"lon":121.643878,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.34,"wp":[18.06833,121.64089],"wst":"matched","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3803},{"i":5093,"cid":"20BB0085","pid":"P00448930LZ","t":"Construction of Flood Mitigation Structure along Appagonan River and its confluence along Cagayan River (Phase 9), Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Aparri","deo":"Cagayan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":33259747.11,"abc":34300000.0,"fy":"2020","sd":"11/18/2020","cd":"2022-08-04","lat":18.35087,"lon":121.64411,"sm":68,"fm":null,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Appagonan","wn":"Appagonan River","wd":0.01,"wp":[18.35076,121.64406],"wst":"matched","br":null,"len":null,"ph":"Phase 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3804},{"i":5094,"cid":"20BB0085","pid":"P00448930LZ","t":"Construction of Flood Mitigation Structure along Appagonan River and its confluence along Cagayan River (Phase 9), Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Aparri","deo":"Cagayan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":33259747.11,"abc":34300000.0,"fy":"2021","sd":"11/18/2020","cd":"2022-08-04","lat":18.35087,"lon":121.64411,"sm":68,"fm":null,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Appagonan","wn":"Appagonan River","wd":0.01,"wp":[18.35076,121.64406],"wst":"matched","br":null,"len":null,"ph":"Phase 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3805},{"i":5095,"cid":"22BB0016","pid":"P00621025LZ","t":"Construction of Flood Control Structure along Cagayan River, Centro Norte Section 2, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":24499889.95,"abc":24500000.0,"fy":"2022","sd":"02/02/2022","cd":"2023-05-28","lat":18.068236,"lon":121.644392,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.35,"wp":[18.06933,121.64127],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3806},{"i":5096,"cid":"22BB0021","pid":"P00621030LZ","t":"Construction of River Control along Cagayan River in Centro Norte Zone 1 and Zone 2 in Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"CMG JR. BUILDERS / W.D. NAVARRO CONSTRUCTION CO.","c":48999684.98,"abc":49000000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-06-11","lat":18.069149,"lon":121.644898,"sm":569,"fm":569,"tm":null,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.37,"wp":[18.07029,121.64164],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3807},{"i":5097,"cid":"23BF0044","pid":"P00726440LZ","t":"Construction of Siffu River Flood Control Project (Quiling Section), Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":72374776.2,"abc":71894190.0,"fy":"2023","sd":"04/20/2023","cd":"2023-10-02","lat":17.12723,"lon":121.645042,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.12698,121.64488],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00668,"text":"Contract cost is 0.67% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":773},{"i":5098,"cid":"20BB0083","pid":"P00448928LZ","t":"Construction of Flood Mitigation Structure along Appagonan River and its confluence along Cagayan River (Phase 10), Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Aparri","deo":"Cagayan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":33211358.78,"abc":34300000.0,"fy":"2020","sd":"11/18/2020","cd":"2022-07-10","lat":18.35023,"lon":121.64527,"sm":68,"fm":null,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Appagonan","wn":"Appagonan River","wd":0.01,"wp":[18.35013,121.64518],"wst":"matched","br":null,"len":null,"ph":"Phase 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3808},{"i":5099,"cid":"20BB0083","pid":"P00448928LZ","t":"Construction of Flood Mitigation Structure along Appagonan River and its confluence along Cagayan River (Phase 10), Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Aparri","deo":"Cagayan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":33211358.78,"abc":34300000.0,"fy":"2021","sd":"11/18/2020","cd":"2022-07-10","lat":18.35023,"lon":121.64527,"sm":68,"fm":null,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Appagonan","wn":"Appagonan River","wd":0.01,"wp":[18.35013,121.64518],"wst":"matched","br":null,"len":null,"ph":"Phase 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3809},{"i":5100,"cid":"23BB0039","pid":"P00726666LZ","t":"Construction of Flood Control Structure along Cagayan River, L. Adviento, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48980000.0,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-11-26","lat":18.071667,"lon":121.645389,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.29,"wp":[18.07281,121.64288],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3810},{"i":5101,"cid":"22BB0020","pid":"P00621029LZ","t":"Construction of Flood Mitigation Structure along Apagonan River, Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"APARRI (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION)","c":19404000.0,"abc":19600000.0,"fy":"2022","sd":"03/22/2022","cd":"2023-03-13","lat":18.348909,"lon":121.646904,"sm":68,"fm":68,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Apagonan","wn":"Appagonan River","wd":0.01,"wp":[18.3488,121.64686],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3811},{"i":5102,"cid":"22BH0142","pid":"P00639329LZ","t":"Construction of Flood Control Structure at Brgy. Camarag-Fugu bridge Approach, Brgy. Camarag, San Isidro, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN ISIDRO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-11-25","lat":16.773036,"lon":121.64844,"sm":1285,"fm":1285,"tm":1285,"am":1285,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camarag-Fugu bridge Approach","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3812},{"i":5103,"cid":"24BD0203","pid":"P00845938LZ","t":"Construction of Drainage, Solana, Cagayan","w":"Construction of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"SOLANA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"4MD JSL CONSTRUCTION INC. (FORMERLY: JUST SAFE LEADING (JSL) INNOVATIVE CREATION CORPORATION)","c":4929544.47,"abc":4950000.0,"fy":"2024","sd":"09/30/2024","cd":"2025-02-03","lat":17.678347,"lon":121.64845,"sm":1476,"fm":1476,"tm":1476,"am":1476,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3813},{"i":5104,"cid":"23BG0072","pid":"P00725661LZ","t":"Construction of Magat River Flood Control Project, Barangay Culling East, Southern Section, Cabatuan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CABATUAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"D.A. CADELIÑA CONSTRUCTION / GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":71061011.85,"abc":71894189.85,"fy":"2023","sd":"04/11/2023","cd":"2023-06-20","lat":16.955337,"lon":121.648616,"sm":276,"fm":276,"tm":276,"am":276,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.12,"wp":[16.95598,121.64776],"wst":"matched","br":"Culling East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3814},{"i":5105,"cid":"24BG0006","pid":"P00820164LZ","t":"Construction of Flood Control Structure, Barangay Paraiso, Cabatuan, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"CABATUAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":77154847.16,"abc":77199999.54,"fy":"2024","sd":"04/11/2024","cd":"2024-06-20","lat":16.955311,"lon":121.648717,"sm":276,"fm":276,"tm":276,"am":276,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paraiso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3815},{"i":5106,"cid":"24BB0092","pid":"P00824681LZ","t":"Construction of Cagayan River Revetment 3 L/S, Casicallan, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48985000.0,"abc":49000000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-07-15","lat":18.08083,"lon":121.65028,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.33,"wp":[18.08259,121.64779],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3816},{"i":5107,"cid":"23BB0082","pid":"P00726669LZ","t":"Rehabilitation of Flood Control Structure along Cagayan River (Phase 2), Gattaran, Cagayan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":22530000.0,"abc":22540000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-01-28","lat":18.081667,"lon":121.650556,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.3,"wp":[18.08326,121.64831],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[5371,5113,5366],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BB0079 to 23BB0082) cover the same site, together worth PHP 179,649,545.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":650},{"i":5108,"cid":"24CN0069","pid":"P00838513LZ","t":"Construction of Flood Control Structure, Brgy. Borlongan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-10-21","lat":15.988285,"lon":121.65159,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Borlongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3817},{"i":5109,"cid":"22BB0125","pid":"P00639334LZ","t":"Construction of Waterway Structure along Riverbanks, Barangay Catayauan (Upstream) Lallo, Cagayan","w":"Construction of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":47764380.24,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2024-05-12","lat":18.1675,"lon":121.65167,"sm":740,"fm":740,"tm":null,"am":740,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catayauan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3818},{"i":5110,"cid":"22BB0126","pid":"P00639335LZ","t":"Construction of Waterway Structure along Riverbanks, Barangay Catayauan (Downstream) Lallo, Cagayan","w":"Construction of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"JIRK CONSTRUCTION / JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":47764065.48,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2024-05-12","lat":18.169284,"lon":121.652166,"sm":740,"fm":740,"tm":null,"am":740,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catayauan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3819},{"i":5111,"cid":"22BH0138","pid":"P00639332LZ","t":"Construction of Maligaya Flood Control Structure, Brgy. Maligaya, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96497912.21,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-03-16","lat":16.689461,"lon":121.654251,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maligaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3820},{"i":5112,"cid":"23BB0045","pid":"P00726665LZ","t":"Construction of Flood Control Structure along Cagayan River, Casicallan, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48985067.24,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-06-25","lat":18.093519,"lon":121.655103,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.45,"wp":[18.09382,121.65089],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3821},{"i":5113,"cid":"23BB0080","pid":"P00726433LZ","t":"Construction of Flood Control Structure along Cagayan River, Toran, Aparri, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"APARRI (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":86600000.0,"abc":86850000.0,"fy":"2023","sd":"04/02/2023","cd":"2024-05-06","lat":18.307,"lon":121.655337,"sm":68,"fm":68,"tm":68,"am":68,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.31,"wp":[18.30579,121.6527],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5371,5366,5107],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BB0079 to 23BB0082) cover the same site, together worth PHP 179,649,545.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":365},{"i":5114,"cid":"23BB0028","pid":"P00726675LZ","t":"Construction of Flood Control Structure along Cagayan River, Catayauan, Lal-lo, Cagayan","w":"Construction of Revetment","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"CMG JR. BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-01-28","lat":18.154444,"lon":121.655556,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.36,"wp":[18.15259,121.65277],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5117,5122],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BB0028 to 23BB0030) cover the same site, together worth PHP 127,389,793.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":488},{"i":5115,"cid":"21B00065","pid":"P00526281LZ","t":"Construction of Bank Protection Works along Cagayan River at Gattaran, Cagayan (Aguiguican Section)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":null,"deo":"Cagayan 1st District Engineering Office","co":"CMG JR. BUILDERS / W.D. NAVARRO CONSTRUCTION CO.","c":93970895.47,"abc":94500000.0,"fy":"2021","sd":"10/25/2021","cd":"2022-08-20","lat":18.09572,"lon":121.65764,"sm":null,"fm":null,"tm":null,"am":569,"md":null,"ls":"unknown","ww":"Cagayan","wn":"Cagayan River","wd":0.7,"wp":[18.09619,121.65108],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":135},{"i":5116,"cid":"24BB0073","pid":"P00821186LZ","t":"Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":96490000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-02","lat":18.098333,"lon":121.658056,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.7,"wp":[18.09949,121.65153],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[5121,5125,5128],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24BB0073 to 24BB0076) cover the same site, together worth PHP 385,958,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":287},{"i":5117,"cid":"23BB0029","pid":"P00726674LZ","t":"Construction of Flood Control Structure along Cagayan River, Tucalana, Lal-lo, Cagayan","w":"Construction of Revetment","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"CMG JR. BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-09-29","lat":18.182004,"lon":121.658436,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.35,"wp":[18.18355,121.65558],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5114,5122],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BB0028 to 23BB0030) cover the same site, together worth PHP 127,389,793.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":489},{"i":5118,"cid":"22BB0079","pid":"P00631105LZ","t":"Construction of Revetment along Cagayan River, Barangay Tucalana, Lal-lo, Cagayan","w":"Construction of Revetment","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"JIRK CONSTRUCTION","c":28518000.0,"abc":29400000.0,"fy":"2022","sd":"08/03/2022","cd":"2023-06-01","lat":18.18297,"lon":121.658858,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.34,"wp":[18.18398,121.65578],"wst":"matched","br":"Tucalana","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3822},{"i":5119,"cid":"22BB0130","pid":"P00640506LZ","t":"Construction of Flood Control Structure, Cagayan River, Tucalana, Lal-lo, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":49398023.35,"abc":49500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-05-28","lat":18.183056,"lon":121.658889,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.34,"wp":[18.18407,121.65581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3823},{"i":5120,"cid":"22B00023","pid":"P00630932LZ","t":"Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":141079466.5,"abc":141750000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-06-24","lat":18.298428,"lon":121.659688,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":387.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3824},{"i":5121,"cid":"24BB0074","pid":"P00821187LZ","t":"Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":96488000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-08-19","lat":18.100505,"lon":121.659988,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.8,"wp":[18.10616,121.65523],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[5116,5125,5128],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24BB0073 to 24BB0076) cover the same site, together worth PHP 385,958,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":288},{"i":5122,"cid":"23BB0030","pid":"P00726673LZ","t":"Repair/Restoration of Damaged Revetment at Cagayan River Revetment 19, Centro, Lallo, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"JIRK CONSTRUCTION","c":29389792.97,"abc":29400000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-12-11","lat":18.198889,"lon":121.660833,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.32,"wp":[18.19763,121.65815],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5114,5117],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BB0028 to 23BB0030) cover the same site, together worth PHP 127,389,793.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":616},{"i":5123,"cid":"22BB0128","pid":"P00640504LZ","t":"Construction of Flood Control Structure along Cagayan River, Barangay Centro, Lal-lo, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":49398048.36,"abc":49500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-05-28","lat":18.199167,"lon":121.661111,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.36,"wp":[18.19774,121.65809],"wst":"matched","br":"Centro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3825},{"i":5124,"cid":"22BB0129","pid":"P00640505LZ","t":"Construction of Flood Control Structure, Cagayan River, Brgy. Bagumbayan, Lal-lo, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LAL-LO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":49399244.41,"abc":49500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-05-28","lat":18.195833,"lon":121.661667,"sm":740,"fm":740,"tm":740,"am":740,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.32,"wp":[18.1956,121.65863],"wst":"matched","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3826},{"i":5125,"cid":"24BB0075","pid":"P00821188LZ","t":"Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 3","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":96490000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2025-01-24","lat":18.102522,"lon":121.661794,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.69,"wp":[18.10875,121.66172],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[5116,5121,5128],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24BB0073 to 24BB0076) cover the same site, together worth PHP 385,958,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":289},{"i":5126,"cid":"24BF0061","pid":"P00824877LZ","t":"Construction of Mallig River Flood Control Project, Barangay Imbiao Phase II, Sta. 0+960 - Sta. 1+760, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96497828.67,"abc":96500000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-02-10","lat":17.155057,"lon":121.661873,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.07,"wp":[17.15447,121.66182],"wst":"matched","br":"Imbiao Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3827},{"i":5127,"cid":"23BF0002","pid":"P00726422LZ","t":"Construction of Siffu River Flood Control Project (Camaal Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Camaal, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":48232335.87,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-07-24","lat":17.121069,"lon":121.66213,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.09,"wp":[17.12135,121.66291],"wst":"matched","br":"Camaal","len":400.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3828},{"i":5128,"cid":"24BB0076","pid":"P00821189LZ","t":"Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 4","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":96490000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-12-02","lat":18.104355,"lon":121.664097,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.47,"wp":[18.1086,121.66442],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[5116,5121,5125],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24BB0073 to 24BB0076) cover the same site, together worth PHP 385,958,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":290},{"i":5129,"cid":"24BH0113","pid":"P00845945LZ","t":"Construction of Dammang West Flood Control Structure, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":49490000.0,"abc":49500000.0,"fy":"2024","sd":"05/10/2024","cd":"2024-07-18","lat":16.694116,"lon":121.664333,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3829},{"i":5130,"cid":"24BH0203","pid":"P00843267LZ","t":"Construction of Malannit Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-10","lat":16.573438,"lon":121.664717,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3830},{"i":5131,"cid":"24BH0186","pid":"P00843277LZ","t":"Construction of Pongpongan Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96487840.0,"abc":96500000.0,"fy":"2024","sd":"06/06/2024","cd":"2024-11-12","lat":16.573056,"lon":121.664859,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3831},{"i":5132,"cid":"24CN0073","pid":"P00838517LZ","t":"Construction of Flood Control Structure, Brgy. Dianed, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":47338372.71,"abc":48250000.0,"fy":"2024","sd":"04/30/2024","cd":"2025-05-08","lat":16.007996,"lon":121.665518,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dianed","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3832},{"i":5133,"cid":"23BH0147","pid":"P00726874LZ","t":"Construction of Barangay Payac Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96465021.4,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-09-15","lat":16.574266,"lon":121.666419,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Payac Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3833},{"i":5134,"cid":"22BH0062","pid":"P00631137LZ","t":"Construction of Cagayan River Flood Control Structure, Sta. 0+240 - Sta. 0+747, Dammang West, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":45080000.0,"abc":45080000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-08-08","lat":16.694026,"lon":121.667683,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.17,"wp":[16.69556,121.66785],"wst":"matched","br":null,"len":507.0,"ph":null,"dup":[5135],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 64,680,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":971},{"i":5135,"cid":"22BH0125","pid":"P00621617LZ","t":"Rehabilitation of Cagayan River Flood Control Project, Sta. 0+000 - Sta. 0+202, Dammang West, Echague, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-09-01","lat":16.694026,"lon":121.667683,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.17,"wp":[16.69556,121.66785],"wst":"matched","br":null,"len":202.0,"ph":null,"dup":[5134],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 64,680,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1027},{"i":5136,"cid":"22BA0040","pid":"P00632792LZ","t":"Construction of Retaining Wall (Along Clemente Laurel Residence), Barangay Uvoy, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"MOJR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4925027.42,"abc":4950000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-08-05","lat":20.414528,"lon":121.948873,"sm":876,"fm":876,"tm":876,"am":876,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Uvoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3834},{"i":5137,"cid":"22BG0020","pid":"P00621060LZ","t":"Construction of Pinacanauan River Flood Control Project , Brgy. Zone 2, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":19294339.84,"abc":19599997.65,"fy":"2022","sd":"03/28/2022","cd":"2022-07-12","lat":16.982072,"lon":122.019586,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zone 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3835},{"i":5138,"cid":"22BD0050","pid":"P00621412LZ","t":"Pinacanauan River Flood Management Projects, San Roque, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY / C.T. LEONCIO CONSTRUCTION & TRADING","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-11-27","lat":17.658447,"lon":121.806097,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":19.59,"wp":[17.48631,121.8492],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3836},{"i":5139,"cid":"23GF0062","pid":"P00733297VS","t":"Construction of Oton Shoreline Protection including Access Road, Oton, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"OTON (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"ASIA STRUCTURAL DEVELOPER CORPORATION","c":29399309.86,"abc":29400000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-05-10","lat":10.592652,"lon":122.114399,"sm":1046,"fm":1046,"tm":1046,"am":1296,"md":34.99,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":48,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":34.99,"text":"The pin is 35.0 km outside Oton, Iloilo, the nearest municipality the record claims. It falls in San Joaquin, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":209},{"i":5140,"cid":"22EH0018","pid":"P00631317LZ","t":"Construction of Bariri Slope Protection Structure (Phase II), Sitio Bariri, Hinag-oman, Ferrol, Romblon","w":"Construction of Slope Protection Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"FERROL (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":42058853.51,"abc":42139999.5,"fy":"2022","sd":"02/23/2022","cd":"2022-09-21","lat":12.3003,"lon":121.9489,"sm":556,"fm":556,"tm":556,"am":556,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3837},{"i":5141,"cid":"24EH0107","pid":"P00844782LZ","t":"Construction of Canlumay Flood Control Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":48997740.27,"abc":48999999.95,"fy":"2024","sd":"04/08/2024","cd":"2024-11-25","lat":12.43595,"lon":122.02034,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3838},{"i":5142,"cid":"21B00009","pid":"P00526277LZ","t":"Construction of Flood Control System, Package I, Sta. 0+000 - Sta. 0+296 (Upstream), Balasig, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":75587196.78,"abc":75829275.0,"fy":"2021","sd":"08/02/2021","cd":"2022-11-04","lat":17.390201,"lon":121.806701,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":296.0,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3839},{"i":5143,"cid":"23BH0155","pid":"P00727111LZ","t":"Construction of Barangay Cabulay Flood Control Structure, Sta. 0+000 - Sta. 0+350, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"NTL BUILDERS AND DEVELOPER","c":48997907.91,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-09-28","lat":16.719097,"lon":121.508066,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabulay Flood Control Structure","len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3840},{"i":5144,"cid":"23BG0126","pid":"P00726444LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Dipusu, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":96399710.65,"abc":96499994.5,"fy":"2023","sd":"05/17/2023","cd":"2024-02-19","lat":16.925731,"lon":122.021204,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dipusu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3841},{"i":5145,"cid":"22BA0044","pid":"P00632793LZ","t":"Construction of Retaining Wall at Joon St., Barangay Kaumbakan, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"MOJR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4900000.0,"abc":4924000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-09-25","lat":20.416094,"lon":121.949062,"sm":876,"fm":876,"tm":876,"am":876,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaumbakan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3842},{"i":5146,"cid":"23BF0020","pid":"P00726420LZ","t":"Construction of Siffu River Flood Control Project (Barangay San Jose Section), Sta. 0+000 - Sta. 0+600, Barangay San Jose, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48231388.59,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-07-10","lat":17.155021,"lon":121.806821,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.15504,121.80713],"wst":"matched","br":"San Jose Section","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3843},{"i":5147,"cid":"22BH0113","pid":"P00639463LZ","t":"Construction of Addalam Flood Control Structure, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-07","lat":16.521205,"lon":121.671958,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3844},{"i":5148,"cid":"24BH0197","pid":"P00823345LZ","t":"Construction of Laoag Flood Control Structures, Sta. 0+000-Sta. 0+790, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96398940.0,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-21","lat":16.431594,"lon":121.744491,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":790.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3845},{"i":5149,"cid":"21PM0003","pid":"P00525920LZ","t":"Construction of Katao Flood Control,  Sta. 82 + 580 - Sta. 82 + 720 (R.S.), Sta 83+130 - Sta 83+192,  Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"Paracelis","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES","c":19339539.28,"abc":19600000.0,"fy":"2021","sd":"04/03/2022","cd":"2022-09-26","lat":17.28167,"lon":121.50861,"sm":1102,"fm":null,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":202.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3846},{"i":5150,"cid":"24GF0044","pid":"P00821048VS","t":"Construction of San Joaqin Shoreline Protection including access road, San Joaqin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"JORDON CONSTRUCTION AND SUPPLY","c":29096770.92,"abc":29400000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-10-05","lat":10.582627,"lon":122.116463,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3847},{"i":5151,"cid":"22EA0151","pid":"P00639511LZ","t":"Construction of Flood Control Structure at Brgy. Malbog, Buenavista, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"ANNCORP BUILDERS, INC.","c":9596042.28,"abc":9798000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-07","lat":13.2709,"lon":121.9506,"sm":241,"fm":241,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malbog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3848},{"i":5152,"cid":"22EH0005","pid":"P00620670LZ","t":"Construction of Panique (Upstream) Flood Control Structure Phase 2, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48239485.81,"abc":48999999.5,"fy":"2022","sd":"02/24/2022","cd":"2022-09-20","lat":12.4731,"lon":122.0228,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3849},{"i":5153,"cid":"24BB0091","pid":"P00824680LZ","t":"Construction of Dummun River Revetment 1, R/S, Nabaccayan, Gattaran, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-11-07","lat":18.0436,"lon":121.74528,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":"Dummun","wn":"Dummun River","wd":0.05,"wp":[18.04322,121.74557],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3850},{"i":5154,"cid":"21J00043","pid":"P00522042MN","t":"Construction of Flood Control Structure at Saaz River along San Ramon Br. 2 along Zamboanga City-Labuan-Limpapa Secondary Road, Talisayan, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"ALTOS CONSTRUCTION / GRACE CONSTRUCTION CORPORATION","c":89083475.33,"abc":104347826.1,"fy":"2021","sd":"02/22/2021","cd":"2022-08-02","lat":7.015891,"lon":121.950643,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Saaz","wn":"Saaz River","wd":0.03,"wp":[7.01572,121.9509],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3851},{"i":5155,"cid":"23CN0076","pid":"P00737446LZ","t":"Construction of Drainage Canal, Brgy. Calabuanan, Baler, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"VANMARVIL CONSTRUCTION","c":19800000.0,"abc":19800000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-07","lat":15.74696,"lon":121.5087,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calabuanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3852},{"i":5156,"cid":"24BH0159","pid":"P00843264LZ","t":"Construction of Flood Control Struture, Barangay Tupax, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489542.98,"abc":96500000.0,"fy":"2024","sd":"06/06/2024","cd":"2024-12-04","lat":16.520601,"lon":121.672352,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupax","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3853},{"i":5157,"cid":"24EH0071","pid":"P00823571LZ","t":"Construction of Flood Control Structure, Sitio Agcahico Brgy.Carmen, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96500000.0,"abc":96499999.6,"fy":"2024","sd":"03/13/2024","cd":"2024-11-15","lat":12.6197,"lon":122.1175,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":610.56,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 611 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":434},{"i":5158,"cid":"24BF0034","pid":"P00824890LZ","t":"Construction of Siffu River Flood Control Project, Barangay San Jose Phase II, Sta.0+600 - Sta. 1+400, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":96400096.41,"abc":96500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-09-23","lat":17.154225,"lon":121.806854,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.04,"wp":[17.15431,121.80722],"wst":"matched","br":"San Jose Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3854},{"i":5159,"cid":"22EH0036","pid":"P00621493LZ","t":"Construction of Palo-o Flood Control Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ATHENA CONSTRUCTION AND DEVELOPMENT","c":24499568.19,"abc":24499999.56,"fy":"2022","sd":"04/11/2022","cd":"2022-09-15","lat":12.408611,"lon":122.023611,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3855},{"i":5160,"cid":"23BA0018","pid":"P00726106LZ","t":"Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN), K0032 + 088 - K0032 + 119, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"MOJR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":29260381.63,"abc":29366024.0,"fy":"2023","sd":"02/17/2023","cd":"2024-03-11","lat":20.4099,"lon":121.952018,"sm":876,"fm":876,"tm":876,"am":876,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3856},{"i":5161,"cid":"23BH0137","pid":"P00726863LZ","t":"Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 2, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96490419.85,"abc":96500000.0,"fy":"2023","sd":"06/15/2023","cd":"2023-10-16","lat":16.457162,"lon":121.746322,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinaoangan Norte Flood Control Structure","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3857},{"i":5162,"cid":"24BE0104","pid":"P00824688LZ","t":"Construction of Drainage Canal, Brgy. District 1, Tumauini, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"ARVEA'S CONSTRUCTION","c":4894751.6,"abc":4900000.0,"fy":"2024","sd":"06/20/2024","cd":"2024-10-05","lat":17.27836,"lon":121.80796,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3858},{"i":5163,"cid":"23BH0139","pid":"P00726866LZ","t":"Construction of Barangay Virgoneza Flood Control Structure, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-11-18","lat":16.467503,"lon":121.746843,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Virgoneza Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3859},{"i":5164,"cid":"22DJ0133","pid":"P00621425LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 6), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-07","lat":13.96797,"lon":121.50941,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.0,"wp":[13.96794,121.50939],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[5219,5221,5236,5191,5228,5187,5243,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":219},{"i":5165,"cid":"22BG0085","pid":"P00621063LZ","t":"Construction of Pinacanauan River Flood Control Project, Brgy. Marannao, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":38606304.15,"abc":39199998.39,"fy":"2022","sd":"02/14/2022","cd":"2022-11-07","lat":16.949814,"lon":122.023667,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marannao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3860},{"i":5166,"cid":"24BE0015","pid":"P00821193LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":139905285.6,"abc":139925000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-07-22","lat":17.13405,"lon":121.86474,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.13,"wp":[17.13413,121.86354],"wst":"matched","br":"Calamagui 2nd","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3861},{"i":5167,"cid":"23EH0082","pid":"P00727195LZ","t":"Construction of Carmen Flood Control, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"EMQ DESIGN & CONSTRUCTION","c":48993645.35,"abc":48999999.6,"fy":"2023","sd":"03/27/2023","cd":"2023-07-27","lat":12.61972,"lon":122.11778,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3862},{"i":5168,"cid":"24BA0013","pid":"P00820776LZ","t":"Construction of Songsong Flood Control, Kayvaluganan, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":9698205.04,"abc":9800000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-06-25","lat":20.357072,"lon":121.95225,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3863},{"i":5169,"cid":"24EH0114","pid":"P00844548LZ","t":"Construction of Carmen Flood Control Structure Phase 2, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR / SIM CONSTRUCTION, TRADING AND SERVICES","c":48247354.86,"abc":48249999.93,"fy":"2024","sd":"03/20/2024","cd":"2024-08-19","lat":12.6203,"lon":122.1181,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3864},{"i":5170,"cid":"23B00036","pid":"P00726882LZ","t":"Construction of Carpentero-Compania Flood Control Phase II, Tumauini, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"ARVEA'S CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":108668817.1,"abc":108882000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-04-02","lat":17.265674,"lon":121.808079,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3865},{"i":5171,"cid":"23BH0140","pid":"P00726867LZ","t":"Construction of Barangay Virgoneza Flood Control Structure, Section 2, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"COLBY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-11-18","lat":16.473388,"lon":121.747978,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Virgoneza Flood Control Structure","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3866},{"i":5172,"cid":"23BE0108","pid":"P00726683LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Barangay Mozzozzin Sur, Sta. Maria, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTA MARIA (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48990135.04,"abc":49000000.0,"fy":"2023","sd":"05/19/2023","cd":"2023-10-23","lat":17.45379,"lon":121.74876,"sm":1394,"fm":1394,"tm":1394,"am":1394,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.39,"wp":[17.45051,121.75024],"wst":"matched","br":"Mozzozzin Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3867},{"i":5173,"cid":"24PM0019","pid":"P00821548LZ","t":"Construction of Muliang Flood Control, Anonat, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES / GAWIS CONSTRUCTION SERVICES","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-22","lat":17.14228,"lon":121.50986,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3868},{"i":5174,"cid":"22EH0033","pid":"P00620675LZ","t":"Construction/Rehabilitation of Pag-Alad Flood Mitigating Structure along Parpagoha River Control, San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR / SCATR CONSTRUCTION","c":29399566.76,"abc":29399999.47,"fy":"2022","sd":"02/28/2022","cd":"2022-10-26","lat":12.5192,"lon":122.0247,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":"Parpagoha","wn":"Parpagoja River","wd":0.0,"wp":[12.51919,122.02471],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3869},{"i":5175,"cid":"24BE0076","pid":"P00820781LZ","t":"Construction of Pasa Small Reservoir IS Slope Protection at Existing Bridge, City Of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":9794710.0,"abc":9800000.0,"fy":"2024","sd":"06/11/2024","cd":"2024-08-15","lat":17.1909,"lon":121.95469,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3870},{"i":5176,"cid":"23BF0047","pid":"P00726418LZ","t":"Construction of Siffu River Flood Control Project (Barangay Rizal Section), Sta. 0+000 - Sta. 0+600, Barangay Rizal, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":48217377.67,"abc":47929460.0,"fy":"2023","sd":"03/13/2023","cd":"2023-10-17","lat":17.120138,"lon":121.672448,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.02,"wp":[17.12009,121.67228],"wst":"matched","br":"Rizal Section","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00601,"text":"Contract cost is 0.60% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":887},{"i":5177,"cid":"24GF0003","pid":"P00820156VS","t":"Construction of Antalon CIS Slope Protection, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"DEACONS TEMPLE CONSTRUCTION & SUPPLY","c":5844865.02,"abc":5880000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-27","lat":10.6169,"lon":122.11819,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3871},{"i":5178,"cid":"22BG0021","pid":"P00631121LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Labinab Pequeño, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":43460547.86,"abc":44099997.83,"fy":"2022","sd":"02/14/2022","cd":"2023-03-05","lat":16.980436,"lon":121.809481,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[16.97822,121.80925],"wst":"matched","br":"Labinab Pequeño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3872},{"i":5179,"cid":"23B00057","pid":"P00725678LZ","t":"Construction of Slope Protection Works for Cagayan River Basin, Cagayan River at Sta. Maria, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"SANTA MARIA (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":189900000.0,"abc":190000000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-02-29","lat":17.453757,"lon":121.748812,"sm":1394,"fm":1394,"tm":null,"am":1394,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.39,"wp":[17.45053,121.75027],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3873},{"i":5180,"cid":"22EA0101","pid":"P00632921LZ","t":"Construction of Argao Breakwater/Seawall, Barangay Argao, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"K CONSTRUCTION & DEVELOPERS CORPORATION","c":9898841.47,"abc":9898000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-14","lat":13.550603,"lon":121.864813,"sm":982,"fm":982,"tm":982,"am":982,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Argao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3874},{"i":5181,"cid":"22CN0107","pid":"P00631149LZ","t":"Construction of Flood Control Structure, Brgy. Cabituculan East, Maria Aurora, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"CONRADO B. BAUTISTA CONST. & SUPPLY CORP. (FORMERL","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-19","lat":15.79485,"lon":121.5105,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabituculan East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3875},{"i":5182,"cid":"22EA0240","pid":"P00639515LZ","t":"Construction of Libas Flood Control Structure, Buenavista, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"KURDZ CONSTRUCTION","c":21976855.62,"abc":22538000.0,"fy":"2022","sd":"06/27/2022","cd":"2023-04-10","lat":13.241018,"lon":121.955809,"sm":241,"fm":241,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3876},{"i":5183,"cid":"23EH0078","pid":"P00725879LZ","t":"Construction of Pag-Alad Flood Mitigating Structure (Phase 2) along Parpagoha River Control, San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / KPSL GENERAL CONTRACTOR INC.","c":94085449.7,"abc":94087499.48,"fy":"2023","sd":"03/09/2023","cd":"2023-09-13","lat":12.525,"lon":122.02528,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":"Parpagoha","wn":"Parpagoja River","wd":0.01,"wp":[12.52495,122.02537],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3877},{"i":5184,"cid":"23E00132","pid":"P00740421LZ","t":"Construction of Sta Cruz Seawall, Barangay Morales Section, Sta Cruz, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":241247074.9,"abc":241249999.4,"fy":"2023","sd":"04/13/2023","cd":"2024-05-14","lat":13.4653,"lon":122.1182,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Morales Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3878},{"i":5185,"cid":"24BH0193","pid":"P00843270LZ","t":"Construction of Masaya Sur Flood Control Structure, Section 1, barangay Masaya Sur, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96477720.0,"abc":96500000.0,"fy":"2024","sd":"05/20/2024","cd":"2024-08-01","lat":16.486288,"lon":121.749057,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masaya Sur","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3879},{"i":5186,"cid":"23BH0189","pid":"P00742125LZ","t":"Construction of Flood Control Structure, Brgy. Sinnipil, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":74228232.76,"abc":74250000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-08-30","lat":16.903439,"lon":121.864825,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinnipil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3880},{"i":5187,"cid":"22DJ0131","pid":"P00621424LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 5), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-05","lat":13.96556,"lon":121.5105,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.02,"wp":[13.96555,121.51067],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[5219,5221,5236,5191,5228,5243,5164,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":220},{"i":5188,"cid":"24BG0118","pid":"P00823334LZ","t":"Construction of Flood Control Structure, Barangay Saranay, Cabatuan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CABATUAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489843.46,"abc":96499995.43,"fy":"2024","sd":"06/07/2024","cd":"2024-08-08","lat":16.976894,"lon":121.675593,"sm":276,"fm":276,"tm":276,"am":276,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Saranay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3881},{"i":5189,"cid":"22BG0080","pid":"P00631129LZ","t":"Construction of Pinacanauan River Flood Control Project, Brgy. Yeban-Sur-Maluno Norte, Benito Soliven, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BENITO SOLIVEN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT","c":38376540.84,"abc":39199998.96,"fy":"2022","sd":"02/14/2022","cd":"2023-01-07","lat":17.015722,"lon":121.956936,"sm":199,"fm":199,"tm":199,"am":199,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Yeban-Sur-Maluno Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3882},{"i":5190,"cid":"24BH0205","pid":"P00843288LZ","t":"Construction of Arubub Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 730, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96499634.76,"abc":96500000.0,"fy":"2024","sd":"06/04/2024","cd":"2024-10-15","lat":16.541947,"lon":121.676014,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":730.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3883},{"i":5191,"cid":"22DJ0129","pid":"P00621423LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 4), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-03-15","lat":13.96281,"lon":121.51066,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.02,"wp":[13.96284,121.51083],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[5219,5221,5236,5228,5187,5243,5164,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":221},{"i":5192,"cid":"23EH0085","pid":"P00727192LZ","t":"Construction of Doña Juana Flood Control Structure along Tablas Circumferential Road, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":48999999.31,"fy":"2023","sd":"04/18/2023","cd":"2023-12-07","lat":12.55778,"lon":122.11917,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3884},{"i":5193,"cid":"24E00118","pid":"P00823577LZ","t":"Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":289492750.9,"abc":289500000.0,"fy":"2024","sd":"03/02/2024","cd":"2024-08-10","lat":12.524962,"lon":122.025428,"sm":1255,"fm":1255,"tm":1213,"am":1255,"md":0.0,"ls":"inside","ww":"Pagpagoha","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.19,"text":"The record contradicts itself: the municipality field and the pin point to San Andres, Romblon, but the title names Romblon, Romblon, 24 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":415},{"i":5194,"cid":"22BG0003","pid":"P00621058LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Villa Domingo, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) / INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":34292686.14,"abc":34299997.93,"fy":"2022","sd":"02/14/2022","cd":"2023-02-16","lat":16.837172,"lon":121.809531,"sm":59,"fm":59,"tm":59,"am":381,"md":0.25,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.46,"wp":[16.83752,121.81383],"wst":"matched","br":"Villa Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3885},{"i":5195,"cid":"22BG0079","pid":"P00631124LZ","t":"Construction of Flood Control Structure along the bank of Cagayan River, Centro 1, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":42002289.88,"abc":42139998.29,"fy":"2022","sd":"02/14/2022","cd":"2023-01-10","lat":16.761431,"lon":121.749233,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[16.76092,121.75156],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3886},{"i":5196,"cid":"23EA0049","pid":"P00727176LZ","t":"Construction of Flood Control Structure along Boac River, Barangay Boton, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":47927960.67,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-25","lat":13.441075,"lon":121.865483,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.04,"wp":[13.44084,121.8657],"wst":"matched","br":"Boton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3887},{"i":5197,"cid":"23BE0126","pid":"P00742303LZ","t":"Construction of Flood Mitigation Structure along Ilagan River, Brgy.Cabisera 4, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":29689017.0,"abc":29700000.0,"fy":"2023","sd":"06/28/2023","cd":"2023-11-24","lat":17.06724,"lon":121.95696,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.1,"wp":[17.06716,121.95794],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3888},{"i":5198,"cid":"22DJ0135","pid":"P00621465LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 7), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-14","lat":13.96693,"lon":121.51073,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.02,"wp":[13.96685,121.51054],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[5219,5221,5236,5191,5228,5187,5243,5164,5251],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":490},{"i":5199,"cid":"24EH0110","pid":"P00823559LZ","t":"Construction of Flood Mitigation Structure, Dubduban River, Package 2, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96497695.6,"abc":96499999.95,"fy":"2024","sd":"04/08/2024","cd":"2024-09-23","lat":12.570053,"lon":122.11934,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":"Dubduban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":606.64,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 607 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":457},{"i":5200,"cid":"22EH0004","pid":"P00620671LZ","t":"Construction of Tuburan Flood Control Structure (Upstream), Tuburan, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48250000.0,"abc":48999999.5,"fy":"2022","sd":"02/24/2022","cd":"2022-12-12","lat":12.4528,"lon":122.0256,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3889},{"i":5201,"cid":"24EH0070","pid":"P00823570LZ","t":"Construction of Flood Control Structure, Sitio Suong Brgy.Carmen, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96500000.0,"abc":96499999.08,"fy":"2024","sd":"03/13/2024","cd":"2024-12-13","lat":12.6122,"lon":122.1197,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":609.81,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 610 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":435},{"i":5202,"cid":"23BG0037","pid":"P00726706LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Villa Domingo, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / BDA JR CONSTRUCTION / INFINITI CONSTRUCTION AND DEVELOPMENT CORPORATION","c":19499998.06,"abc":19599998.06,"fy":"2023","sd":"02/28/2023","cd":"2023-08-25","lat":16.835574,"lon":121.809702,"sm":59,"fm":59,"tm":59,"am":381,"md":0.1,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.46,"wp":[16.83592,121.81397],"wst":"matched","br":"Villa Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3890},{"i":5203,"cid":"22DL0144","pid":"P00621503LZ","t":"Construction of Flood Control Structure along Maling River, Atimonan, Quezon, Package B","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-30","lat":14.001189,"lon":121.866347,"sm":81,"fm":81,"tm":1188,"am":81,"md":0.0,"ls":"inside","ww":"Maling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":23.09,"text":"The record contradicts itself: the municipality field and the pin point to Atimonan, Quezon, but the title names Quezon, Quezon, 23 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":628},{"i":5204,"cid":"24BG0175","pid":"P00824883LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+722, Benito Soliven, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BENITO SOLIVEN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489915.19,"abc":96499991.68,"fy":"2024","sd":"07/23/2024","cd":"2024-10-15","lat":17.0133,"lon":121.958133,"sm":199,"fm":199,"tm":199,"am":199,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maluno","len":722.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3891},{"i":5205,"cid":"22DJ0027","pid":"P00631309LZ","t":"Construction of Slope Protection along Lagnas River, Barangay Sampaloc II, Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-12-02","lat":13.95778,"lon":121.51083,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.06,"wp":[13.95791,121.51136],"wst":"matched","br":"Sampaloc II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3892},{"i":5206,"cid":"23JH0020","pid":"P00733981MN","t":"Construction of Revetment along Baluno Bridge, Isabela City, Basilan","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"CITY OF ISABELA (CAPITAL) (CITY OF ISABELA)","deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / MMP CONSTRUCTION AND SUPPLIES","c":66305107.01,"abc":66320590.0,"fy":"2023","sd":"05/26/2023","cd":"2024-04-03","lat":6.719419,"lon":122.028279,"sm":null,"fm":null,"tm":null,"am":390,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":136},{"i":5207,"cid":"23BB0090","pid":"P00726670LZ","t":"Repair/Restoration of Damaged Revetment at Cagayan River Revetment 8, Sapping, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION / PRIME MASTER CONST. AND DEV'T. CORP.","c":48969979.62,"abc":49000000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-07-29","lat":18.27,"lon":121.676667,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.11,"wp":[18.26922,121.67601],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":476},{"i":5208,"cid":"24EH0111","pid":"P00823599LZ","t":"Construction of Flood Mitigation Structure - Construction of Dubduban River Control (Phase 2), San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":91672837.61,"abc":91674999.95,"fy":"2024","sd":"04/15/2024","cd":"2024-09-23","lat":12.568915,"lon":122.120665,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":"Dubduban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":606.45,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 606 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":477},{"i":5209,"cid":"22BD0036","pid":"P00620828LZ","t":"Construction of Flood Control System along Cagayan River Basin, Brgy. Alibago, Enrile, Cagayan, Sta. 0+770-Sta. 1+170 (Downstream)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ENRILE (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT","c":92157500.0,"abc":92157500.0,"fy":"2022","sd":"03/28/2022","cd":"2024-02-25","lat":17.56,"lon":121.75,"sm":547,"fm":547,"tm":547,"am":547,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":1.44,"wp":[17.57179,121.7558],"wst":"matched","br":"Alibago","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":416},{"i":5210,"cid":"21BG0024","pid":"P00525962LZ","t":"Construction of Cagayan River Flood Control Project,  Brgy. Labinab Pequeño, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Reina Mercedes","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":45784255.14,"abc":47039932.22,"fy":"2021","sd":"01/19/2022","cd":"2022-12-13","lat":16.978993,"lon":121.81008,"sm":1203,"fm":null,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.1,"wp":[16.97811,121.80994],"wst":"matched","br":"Labinab Pequeño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3893},{"i":5211,"cid":"23EA0053","pid":"P00727180LZ","t":"Construction of Flood Control Structure along Mogpog River, Barangay Sumangga, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":47926470.47,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-10-12","lat":13.477522,"lon":121.866865,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":"Mogpog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sumangga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3894},{"i":5212,"cid":"24JA0028","pid":"P00833577MN","t":"Construction of Flood Mitigation Structure (Drainage), Barangay Recodo, Zamboanga City","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"RME CONSTRUCTION AND ENTERPRISES","c":4574902.04,"abc":4900000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-22","lat":6.954348,"lon":121.958185,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Recodo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3895},{"i":5213,"cid":"22DJ0066","pid":"P00631308LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 1), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-20","lat":13.96207,"lon":121.51087,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.01,"wp":[13.96208,121.51095],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3896},{"i":5214,"cid":"23BB0094","pid":"P00726671LZ","t":"Repair/Restoration of Damaged Revetment at Cagayan River Revetment 9, Sapping-Dacalla-Fugu, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48975000.0,"abc":49000000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-07-29","lat":18.26963,"lon":121.67721,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[18.26882,121.67652],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3897},{"i":5215,"cid":"24BE0125","pid":"P00824689LZ","t":"Construction of Drainage Canal, Brgy. District 2, Tumauini, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"ARVEA'S CONSTRUCTION","c":4894223.2,"abc":4900000.0,"fy":"2024","sd":"06/24/2024","cd":"2024-10-07","lat":17.27208,"lon":121.81045,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3898},{"i":5216,"cid":"23EH0019","pid":"P00726274LZ","t":"Construction of Pag-asa Flood Mitigating Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"R N V CONSTRUCTION","c":48992420.13,"abc":48999999.65,"fy":"2023","sd":"02/21/2023","cd":"2023-09-04","lat":12.4494,"lon":122.0283,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3899},{"i":5217,"cid":"22BH0117","pid":"P00639338LZ","t":"Rehabilitation of Rang-ay Flood Control Structure, Section 1, Sta. 0 + 000 - Sta. 0 + 420, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":67549684.87,"abc":67550000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-08-18","lat":16.459571,"lon":121.750302,"sm":1250,"fm":1250,"tm":null,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":420.0,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3900},{"i":5218,"cid":"23CN0081","pid":"P00737448LZ","t":"Construction of Seawall, Poblacion Zone I, Dinalungan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINALUNGAN (AURORA)","deo":"Aurora District Engineering Office","co":"THREE W BUILDERS, INC.","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"05/16/2023","cd":"2024-04-22","lat":16.135768,"lon":121.95827,"sm":511,"fm":511,"tm":511,"am":511,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3901},{"i":5219,"cid":"22DJ0125","pid":"P00621421LZ","t":"Construction of Slope Protection along Lagnas River (Upstream - Package 2), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JAICA CONST. CORP","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-05-22","lat":13.96186,"lon":121.51116,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.02,"wp":[13.96184,121.51097],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[5221,5236,5191,5228,5187,5243,5164,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":222},{"i":5220,"cid":"22BE0054","pid":"P00621045LZ","t":"Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+050, Sta. 0+241 - Sta. 0+331), Brgy. San Ignacio, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":44057567.8,"abc":44100000.0,"fy":"2022","sd":"05/18/2022","cd":"2022-09-02","lat":17.192568,"lon":121.866899,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[17.19255,121.86826],"wst":"matched","br":"San Ignacio","len":140.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3902},{"i":5221,"cid":"22DJ0126","pid":"P00621427LZ","t":"Construction of Slope Protection along Lagnas River (Downstream - Package 2), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-05-22","lat":13.95748,"lon":121.51141,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.01,"wp":[13.95755,121.51151],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[5219,5236,5191,5228,5187,5243,5164,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":223},{"i":5222,"cid":"24BH0054","pid":"P00821157LZ","t":"Construction of Amobocan, Flood Control Project, Amobocan, Cauayan, Isabela (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION","c":70830035.0,"abc":70830035.0,"fy":"2024","sd":"03/13/2024","cd":"2024-11-12","lat":16.841137,"lon":121.810661,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3903},{"i":5223,"cid":"22EA0023","pid":"P00632923LZ","t":"Construction of Hupi Flood Control, Barangay Hupi, Santa Cruz, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"RPE CONSTRUCTION","c":9898092.96,"abc":9898000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-13","lat":13.500046,"lon":122.028424,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hupi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3904},{"i":5224,"cid":"21EH0053","pid":"P00525650LZ","t":"Construction of Carmen Shore Protection/Causeway Phase 2, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"San Agustin","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":57900000.0,"abc":57899999.5,"fy":"2021","sd":"11/25/2021","cd":"2022-08-08","lat":12.616944,"lon":122.122222,"sm":1252,"fm":null,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3905},{"i":5225,"cid":"21BH0180","pid":"P00525965LZ","t":"Construction of Cagayan River Flood Control Project, Dammang West,  Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Echague","deo":"Isabela 4th District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY","c":46393200.0,"abc":46393200.0,"fy":"2021","sd":"03/09/2022","cd":"2022-09-30","lat":16.693378,"lon":121.678373,"sm":545,"fm":null,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.37,"wp":[16.6967,121.67825],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3906},{"i":5226,"cid":"24BF0045","pid":"P00824881LZ","t":"Construction of Mallig River Flood Control Project, Barangay Sto. Domingo, Sta .0+000 - Sta. 0+800, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":96499999.38,"abc":96500000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-07-31","lat":17.177832,"lon":121.750391,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.04,"wp":[17.17814,121.75059],"wst":"matched","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3907},{"i":5227,"cid":"23BG0074","pid":"P00725659LZ","t":"Rehabilitation of Pinacanauan River Control, Barangay Yeban Sur, Maluno Norte, Sta 0+236.8 - Sta 0+593, Benito Soliven, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"BENITO SOLIVEN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43115610.44,"abc":43136510.53,"fy":"2023","sd":"04/28/2023","cd":"2023-09-21","lat":17.015965,"lon":121.958395,"sm":199,"fm":199,"tm":199,"am":199,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Yeban Sur","len":356.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3908},{"i":5228,"cid":"22DJ0130","pid":"P00621468LZ","t":"Construction of Slope Protection along Lagnas River (Downstream - Package 4), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"JEMAK CONSTRUCTION & SUPPLY / FREPA BUILDER AND CONSTRUCTION SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-02-10","lat":13.95572,"lon":121.51238,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.01,"wp":[13.95572,121.51225],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[5219,5221,5236,5191,5187,5243,5164,5198,5251],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":491},{"i":5229,"cid":"22BE0047","pid":"P00621050LZ","t":"Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+146), Nagulian Baculod, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":39386293.7,"abc":39417560.0,"fy":"2022","sd":"05/18/2022","cd":"2022-12-06","lat":17.1497,"lon":121.8678,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.2,"wp":[17.14823,121.86894],"wst":"matched","br":null,"len":146.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3909},{"i":5230,"cid":"24BG0108","pid":"P00825055LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Marannao, San Mariano, Isabela (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JAY ARCIE CONSTRUCTION AND SUPPLY","c":71919676.47,"abc":72374994.67,"fy":"2024","sd":"05/02/2024","cd":"2024-10-07","lat":16.936036,"lon":122.028481,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marannao","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3910},{"i":5231,"cid":"23BH0059","pid":"P00726132LZ","t":"Construction of Amobocan, Flood Control Project (Package 1), Amobocan, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":29396371.76,"abc":29400000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-08-22","lat":16.841267,"lon":121.810667,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3911},{"i":5232,"cid":"23BF0017","pid":"P00726442LZ","t":"Construction of Siffu River Flood Control Project (Masigun Section), Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":67529995.5,"abc":67550000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-07-02","lat":17.109019,"lon":121.680965,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.11,"wp":[17.10977,121.68027],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3912},{"i":5233,"cid":"23BH0136","pid":"P00726862LZ","t":"Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96424760.83,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-10-16","lat":16.455645,"lon":121.751811,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinaoangan Norte Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3913},{"i":5234,"cid":"21GB0042","pid":"P00549972VS","t":"Construction of Flood Control Structures along Sibalom River, Brgy. San Pedro and Brgy. Pantao, San Jose, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"San Jose","deo":"Antique District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":18829429.38,"abc":19600000.0,"fy":"2021","sd":"09/20/2021","cd":"2022-12-23","lat":10.807213,"lon":121.95844,"sm":1301,"fm":null,"tm":1301,"am":1301,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.13,"wp":[10.80834,121.95884],"wst":"matched","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3914},{"i":5235,"cid":"22DL0072","pid":"P00620610LZ","t":"Construction of Flood Control Structure along Maling River, Atimonan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-24","lat":14.002505,"lon":121.868632,"sm":81,"fm":81,"tm":81,"am":81,"md":0.0,"ls":"inside","ww":"Maling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3915},{"i":5236,"cid":"22DJ0128","pid":"P00621428LZ","t":"Construction of Slope Protection along Lagnas River (Downstream - Package 3), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-05-08","lat":13.95512,"lon":121.51252,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.03,"wp":[13.95513,121.51224],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[5219,5221,5191,5228,5187,5243,5164,5198,5251],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":224},{"i":5237,"cid":"21BG0026","pid":"P00525963LZ","t":"Construction of of Bank Protection along Pinacanauan River, Brgy. Marannao, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"San Mariano","deo":"Isabela 3rd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY","c":45208376.78,"abc":46651907.93,"fy":"2021","sd":"01/19/2022","cd":"2022-07-28","lat":16.939367,"lon":122.02865,"sm":1327,"fm":null,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marannao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3916},{"i":5238,"cid":"22BH0144","pid":"P00637015LZ","t":"Construction of Guyabal Flood Control Project, Guyabal, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-05-17","lat":16.92281,"lon":121.81072,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3917},{"i":5239,"cid":"23EH0100","pid":"P00742463LZ","t":"Construction of Flood Mitigation Structures and Drainage Systems - Construction of Carmen Shore Protection/Causeway, San Agustin, Romblon Phase 3","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":99000000.0,"abc":98999999.78,"fy":"2023","sd":"05/18/2023","cd":"2024-02-29","lat":12.61361,"lon":122.12278,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3918},{"i":5240,"cid":"23B00012","pid":"P00726881LZ","t":"Construction of Gen. E. Batalla Flood Control System, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":114611496.0,"abc":114732000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-11-20","lat":18.244988,"lon":121.681087,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3919},{"i":5241,"cid":"23C00102","pid":"P00727284LZ","t":"Construction of Bulos Flood Control Structure, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":192999742.2,"abc":192999760.8,"fy":"2023","sd":"06/20/2023","cd":"2024-03-31","lat":16.07575,"lon":121.751957,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3920},{"i":5242,"cid":"22BH0122","pid":"P00639465LZ","t":"Construction of Santo Domingo Flood Control Structure, Santo Domingo, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":34299272.21,"abc":34300000.0,"fy":"2022","sd":"04/08/2022","cd":"2022-08-22","lat":16.509076,"lon":121.870123,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3921},{"i":5243,"cid":"22DJ0132","pid":"P00621467LZ","t":"Construction of Slope Protection along Lagnas River (Downstream - Package 5), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-04-13","lat":13.95431,"lon":121.51279,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.04,"wp":[13.9542,121.5124],"wst":"matched","br":null,"len":null,"ph":"Package 5","dup":[],"run":[5219,5221,5236,5191,5228,5187,5164,5198,5251],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":492},{"i":5244,"cid":"23EA0072","pid":"P00742450LZ","t":"Construction of Flood Control Structure, Brgy. Pag-asa, Santa Cruz, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"DD ROSAL CONSTRUCTION","c":4947211.87,"abc":4948000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-15","lat":13.472133,"lon":122.029148,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pag-asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3922},{"i":5245,"cid":"24EH0072","pid":"P00825132LZ","t":"Construction of River Control at Mayor River, Binonga-an, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96500000.0,"abc":96499999.62,"fy":"2024","sd":"03/13/2024","cd":"2024-11-15","lat":12.5317,"lon":122.1228,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":"Mayor","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":603.48,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 603 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":436},{"i":5246,"cid":"23BH0187","pid":"P00742122LZ","t":"Construction of Flood Control Structure, Brgy. San Pablo, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":74229724.81,"abc":74250000.0,"fy":"2023","sd":"05/26/2023","cd":"2023-10-06","lat":16.9365,"lon":121.811098,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Pablo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3923},{"i":5247,"cid":"24BH0196","pid":"P00843248LZ","t":"Construction of Dipangit Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/24/2024","cd":"2024-12-07","lat":16.55664,"lon":121.682515,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3924},{"i":5248,"cid":"22BG0067","pid":"P00631125LZ","t":"Construction of Flood Control Structure along the bank of Cagayan River, Cumu, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":42113172.13,"abc":42139997.53,"fy":"2022","sd":"02/14/2022","cd":"2022-10-13","lat":16.765603,"lon":121.751958,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.24,"wp":[16.7647,121.75404],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3925},{"i":5249,"cid":"24BG0044","pid":"P00821210LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Maluno Norte (Upstream), Benito Soliven, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BENITO SOLIVEN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":62714599.71,"abc":62724997.84,"fy":"2024","sd":"03/27/2024","cd":"2024-07-22","lat":17.018897,"lon":121.958508,"sm":199,"fm":199,"tm":199,"am":199,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maluno Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3926},{"i":5250,"cid":"23BA0023","pid":"P00727343LZ","t":"Construction of Nakanmuan Seawall, Barangay Nakanmuan, Sabtang, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":21238973.04,"abc":24491344.0,"fy":"2023","sd":"03/13/2023","cd":"2023-12-10","lat":20.338155,"lon":121.870315,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nakanmuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3927},{"i":5251,"cid":"22DJ0136","pid":"P00621469LZ","t":"Construction of Slope Protection along Lagnas River (Downstream - Package 7), Sariaya, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-04-03","lat":13.95321,"lon":121.5129,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Lagnas","wn":"Lagnas River","wd":0.06,"wp":[13.95319,121.51234],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[5219,5221,5236,5191,5228,5187,5243,5164,5198],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":10,"text":"10 contracts with consecutive numbers (22DJ0125 to 22DJ0136) cover the same site, together worth PHP 775,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":493},{"i":5252,"cid":"22EA0149","pid":"P00639507LZ","t":"Construction of Bagong Silang Flood Control Structure, Sta. Cruz, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"RPE CONSTRUCTION","c":9799552.49,"abc":9798000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-04","lat":13.4829,"lon":122.0295,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3928},{"i":5253,"cid":"21BE0074","pid":"P00525953LZ","t":"Construction of Flood Control, Sitio Palattao, Pilig Alto, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":19305970.0,"abc":19600000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-08-15","lat":17.37231,"lon":121.81159,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3929},{"i":5254,"cid":"24BH0269","pid":"P00843269LZ","t":"Construction of Masaya Centro Flood Control Structure, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-10","lat":16.51513,"lon":121.752842,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3930},{"i":5255,"cid":"24BK0059","pid":"P00825239LZ","t":"Construction of Cagayan River Flood Control (Lusod Section), Maddela, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"MADDELA (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":34295321.46,"abc":34300000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-10-31","lat":16.32185,"lon":121.6827,"sm":857,"fm":857,"tm":857,"am":857,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.14,"wp":[16.32059,121.68292],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3931},{"i":5256,"cid":"22BA0061","pid":"P00640503LZ","t":"Construction of Retaining Wall, Sitio Ratay, Brgy. Itbud, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"R.L. PACANA'S CONSTRUCTION & DEVELOPMENT","c":4938605.84,"abc":4950000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-01-01","lat":20.366125,"lon":121.958778,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Itbud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3932},{"i":5257,"cid":"23BH0135","pid":"P00726870LZ","t":"Construction of Barangay Quimalabasa Norte Flood Control Project, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-08-17","lat":16.486754,"lon":121.753357,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quimalabasa Norte Flood Control Project","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3933},{"i":5258,"cid":"22B00001","pid":"P00630933LZ","t":"Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":143859986.3,"abc":144250000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-09-30","lat":18.249435,"lon":121.683454,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":550.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3934},{"i":5259,"cid":"22CN0113","pid":"P00631155LZ","t":"Construction of Flood Control Structure, Brgy. Real, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M.  CONSTRUCTION)","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-07-16","lat":15.70604,"lon":121.51449,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Real","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3935},{"i":5260,"cid":"22E00065","pid":"P00621622LZ","t":"Construction of Tiguion River Flood Control, Gasan, Marinduque (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SAN SEBASTIAN CONSTRUCTION","c":19299804.74,"abc":19300000.0,"fy":"2022","sd":"09/02/2022","cd":"2023-03-09","lat":13.351275,"lon":121.870615,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":"Tiguion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3936},{"i":5261,"cid":"22BG0054","pid":"P00620819LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. District 2, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":95052496.94,"abc":96499997.23,"fy":"2022","sd":"03/28/2022","cd":"2023-01-29","lat":16.9801,"lon":121.811847,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[16.97788,121.81148],"wst":"matched","br":"District 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3937},{"i":5262,"cid":"24EH0105","pid":"P00844783LZ","t":"Construction of Pag-alad to Jun Carlo Flood Control Structure, San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"QUEZON","mu":"SAN ANDRES (QUEZON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48997458.75,"abc":48999999.7,"fy":"2024","sd":"05/13/2024","cd":"2024-08-23","lat":12.52833,"lon":122.03194,"sm":1255,"fm":1253,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":101.79,"text":"The record contradicts itself: the title and the pin point to San Andres, Romblon, but the municipality field names San Andres, Quezon, 102 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":538},{"i":5263,"cid":"24CN0077","pid":"P00838521LZ","t":"Construction of Flood Control Structure, Brgy. Marikit, Casiguran, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"CASIGURAN (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"05/07/2024","cd":"2024-12-19","lat":16.271515,"lon":122.125106,"sm":346,"fm":346,"tm":346,"am":346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marikit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3938},{"i":5264,"cid":"23BA0005","pid":"P00726110LZ","t":"Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN) - K0029 + 501 - K0029 + 626, K0029 + 792 - K0029 + 850, K0029 + 935 - K0030 + 095, Mahatao, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"MAHATAO (BATANES)","deo":"Batanes District Engineering Office","co":"J.I. ESPINO CONSTRUCTION","c":28820720.71,"abc":28844120.0,"fy":"2023","sd":"04/18/2023","cd":"2024-03-18","lat":20.392109,"lon":121.95919,"sm":876,"fm":876,"tm":876,"am":876,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3939},{"i":5265,"cid":"24CN0066","pid":"P00838510LZ","t":"Construction of Flood Control Structure along Bulos River (Right Bank), Barangay Dinadiawan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-12-17","lat":16.073965,"lon":121.753491,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":"Bulos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dinadiawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3940},{"i":5266,"cid":"21BE0073","pid":"P00525954LZ","t":"Construction of Flood Control, Brgy. Acoba, Luquilu to Casibarag Sur, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":28958048.1,"abc":29400000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-08-14","lat":17.42718,"lon":121.75351,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Acoba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3941},{"i":5267,"cid":"23BG0040","pid":"P00726703LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Cumu, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":14479105.16,"abc":14699996.09,"fy":"2023","sd":"03/20/2023","cd":"2023-07-10","lat":16.766235,"lon":121.75383,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.09,"wp":[16.76583,121.75456],"wst":"matched","br":"Cumu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3942},{"i":5268,"cid":"24BH0224","pid":"P00843284LZ","t":"Construction of Usol Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":72374258.98,"abc":72375000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-15","lat":16.526194,"lon":121.754832,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3943},{"i":5269,"cid":"24BF0002","pid":"P00820168LZ","t":"Construction of Mallig River Flood Control Project (Barangay Sto. Domingo Phase II), Sta. 0+800 - Sta. 1+600, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":89380485.8,"abc":89385055.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-08","lat":17.76192,"lon":121.756227,"sm":1195,"fm":1195,"tm":1195,"am":631,"md":61.62,"ls":"outside","ww":"Mallig","wn":"Mallig River","wd":56.91,"wp":[17.32943,121.46616],"wst":"matched","br":"Sto. Domingo Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":78,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":61.62,"text":"The pin is 61.6 km outside Quirino, Isabela, the nearest municipality the record claims. It falls in Iguig, Cagayan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":56.91,"text":"The title names Mallig, which OpenStreetMap maps through the stated municipality, but the pin is 56.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":24},{"i":5270,"cid":"22BE0012","pid":"P00621053LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+257 - Sta. 0+477), Malapagay, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48969896.0,"abc":49000000.0,"fy":"2022","sd":"05/18/2022","cd":"2023-01-17","lat":17.365045,"lon":121.756319,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.16,"wp":[17.3642,121.75756],"wst":"matched","br":null,"len":220.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3944},{"i":5271,"cid":"22BG0002","pid":"P00631127LZ","t":"Construction of Flood Control Structure along the bank of Cagayan River, Rancho Bassit, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":41507114.34,"abc":42139997.94,"fy":"2022","sd":"02/14/2022","cd":"2022-07-08","lat":16.753189,"lon":121.757033,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.1,"wp":[16.75387,121.75769],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3945},{"i":5272,"cid":"21BG0002","pid":"P00525959LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Rancho Bassit, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Angadanan","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":28957991.85,"abc":29399957.1,"fy":"2021","sd":"03/28/2022","cd":"2022-08-18","lat":16.752414,"lon":121.757469,"sm":59,"fm":null,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[16.75303,121.7584],"wst":"matched","br":"Rancho Bassit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3946},{"i":5273,"cid":"24BE0066","pid":"P00821216LZ","t":"Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTA MARIA (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":144734339.4,"abc":144750000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-10-18","lat":17.45923,"lon":121.75748,"sm":1394,"fm":1394,"tm":1394,"am":1394,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.69,"wp":[17.45311,121.75872],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3947},{"i":5274,"cid":"22BE0008","pid":"P00621055LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+000 - Sta. 0+215), Uauang Galicia, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48970329.5,"abc":49000000.0,"fy":"2022","sd":"05/18/2022","cd":"2023-03-15","lat":17.367657,"lon":121.757919,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.19,"wp":[17.36661,121.75935],"wst":"matched","br":null,"len":215.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3948},{"i":5275,"cid":"23BE0134","pid":"P00727103LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Brgy. Ammugauan, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48974905.5,"abc":49000000.0,"fy":"2023","sd":"07/27/2023","cd":"2023-12-04","lat":17.4192,"lon":121.7594,"sm":1417,"fm":1417,"tm":1417,"am":271,"md":0.59,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.59,"wp":[17.4244,121.76055],"wst":"matched","br":"Ammugauan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3949},{"i":5276,"cid":"23BH0176","pid":"P00726871LZ","t":"Construction of Barangay Quimalabasa Norte Flood Control Project, Section 2, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-08-17","lat":16.490972,"lon":121.759562,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quimalabasa Norte Flood Control Project","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3950},{"i":5277,"cid":"23BG0013","pid":"P00726707LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Rancho Bassit, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":19306310.58,"abc":19599996.95,"fy":"2023","sd":"03/20/2023","cd":"2023-06-30","lat":16.750152,"lon":121.760484,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.08,"wp":[16.75085,121.76076],"wst":"matched","br":"Rancho Bassit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3951},{"i":5278,"cid":"24BE0019","pid":"P00821201LZ","t":"Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":139912304.5,"abc":139925000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-07-22","lat":17.37156,"lon":121.76092,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.2,"wp":[17.37035,121.76232],"wst":"matched","br":"Malapagay","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3952},{"i":5279,"cid":"23BG0073","pid":"P00727263LZ","t":"Construction of Flood Control Project along Cagayan River, Rancho Bassit, Angadanan, Isabela, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":95827936.6,"abc":95858914.53,"fy":"2023","sd":"04/11/2023","cd":"2023-08-18","lat":16.749983,"lon":121.761352,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.07,"wp":[16.75063,121.76151],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3953},{"i":5280,"cid":"23BG0080","pid":"P00727262LZ","t":"Construction of Flood Control Project along Cagayan River, Consular, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":95858906.48,"abc":95858907.7,"fy":"2023","sd":"03/15/2023","cd":"2023-11-06","lat":16.779363,"lon":121.762558,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.04,"wp":[16.7791,121.7628],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5719,5950,5341],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BG0079 to 23BG0082) cover the same site, together worth PHP 382,239,595.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":291},{"i":5281,"cid":"22BE0004","pid":"P00621054LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+280 - Sta. 0+498), Uauang Tuliao, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48970580.36,"abc":49000000.0,"fy":"2022","sd":"05/18/2022","cd":"2023-04-06","lat":17.373317,"lon":121.762716,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.19,"wp":[17.37218,121.76403],"wst":"matched","br":null,"len":218.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3954},{"i":5282,"cid":"24BH0118","pid":"P00843247LZ","t":"Construction of Dibuluan Flood Control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-10-04","lat":16.512779,"lon":121.763858,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3955},{"i":5283,"cid":"24BG0182","pid":"P00824865LZ","t":"Construction of Flood Control Structure along Cagayan River, Barangays PISBAKAL, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITI CONSTRUCTION AND DEVELOPMENT CORPORATION","c":77157107.5,"abc":77199986.46,"fy":"2024","sd":"07/23/2024","cd":"2025-03-06","lat":16.750294,"lon":121.765219,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[16.75125,121.76464],"wst":"matched","br":"PISBAKAL","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3956},{"i":5284,"cid":"23BE0018","pid":"P00726685LZ","t":"Construction of Flood Mitigation Structure along Cagayan River-Phase III, barangay Uauang Tuliao, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48988899.5,"abc":49000000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-11-17","lat":17.3753,"lon":121.766,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[17.37409,121.76666],"wst":"matched","br":"Uauang Tuliao","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3957},{"i":5285,"cid":"24BH0117","pid":"P00843246LZ","t":"Construction of Dibuluan Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/16/2024","cd":"2024-10-11","lat":16.516379,"lon":121.767377,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3958},{"i":5286,"cid":"24BE0069","pid":"P00845940LZ","t":"Construction of Flood Control Structure, Barangay Tunggui, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"ARVEA'S CONSTRUCTION","c":19789477.17,"abc":19800000.0,"fy":"2024","sd":"06/11/2024","cd":"2024-09-09","lat":17.34326,"lon":121.76748,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tunggui","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3959},{"i":5287,"cid":"23BE0010","pid":"P00727105LZ","t":"Construction of Fugu Abajo Flood Control System, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":29394655.71,"abc":29400000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-15","lat":17.3424,"lon":121.7685,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3960},{"i":5288,"cid":"23BG0045","pid":"P00726880LZ","t":"Construction of Flood Control Structure along Cagayan River, Barangay Ramona, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"D.A. CADELIÑA CONSTRUCTION / GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":71021820.85,"abc":71894187.41,"fy":"2023","sd":"03/15/2023","cd":"2023-08-25","lat":16.813852,"lon":121.76855,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.08,"wp":[16.81336,121.76907],"wst":"matched","br":"Ramona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3961},{"i":5289,"cid":"23BH0156","pid":"P00740314LZ","t":"Construction of Barangay Dibuluan Flood Control Structure, Section 3, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-20","lat":16.516162,"lon":121.768821,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dibuluan Flood Control Structure","len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3962},{"i":5290,"cid":"21BG0154","pid":"P00561165LZ","t":"Construction of flood mitigation structure along magat river with channel excavation/desilting works, Barangay Turod, Municipality of Reina Mercedes, Province of Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Reina Mercedes","deo":"Isabela 3rd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48705999.35,"abc":48999999.35,"fy":"2021","sd":"12/17/2021","cd":"2022-11-26","lat":17.011918,"lon":121.768998,"sm":1203,"fm":null,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Turod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3963},{"i":5291,"cid":"22CN0110","pid":"P00631152LZ","t":"Construction of Flood Control Structure, Brgy. Dinadiawan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":9501082.94,"abc":9800000.0,"fy":"2022","sd":"06/03/2022","cd":"2023-02-21","lat":16.07596,"lon":121.76976,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dinadiawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3964},{"i":5292,"cid":"23BH0231","pid":"P00727108LZ","t":"Construction of Cabaruan, Drainage System Project, Cabaruan, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":48915964.67,"abc":48916000.0,"fy":"2023","sd":"09/04/2023","cd":"2024-09-23","lat":16.944106,"lon":121.77052,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3965},{"i":5293,"cid":"23BD0006","pid":"P00726119LZ","t":"Construction of Drainage System at Camasi, Phase II, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-11-06","lat":17.629472,"lon":121.771708,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3966},{"i":5294,"cid":"23BG0012","pid":"P00726704LZ","t":"Construction of Cagayan River Flood Control Project, Barangay San Guillermo, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":24132730.03,"abc":24499978.82,"fy":"2023","sd":"03/20/2023","cd":"2023-08-18","lat":16.804736,"lon":121.772806,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[16.80558,121.77353],"wst":"matched","br":"San Guillermo","len":null,"ph":null,"dup":[5295],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 72,887,631.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1129},{"i":5295,"cid":"24BG0093","pid":"P00825233LZ","t":"Construction of Cagayan River Flood Control Project, Barangay San Guillermo (Phase III), Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITI CONSTRUCTION AND DEVELOPMENT CORPORATION","c":48754901.14,"abc":48999996.67,"fy":"2024","sd":"04/01/2024","cd":"2024-07-15","lat":16.804736,"lon":121.772806,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[16.80558,121.77353],"wst":"matched","br":"San Guillermo","len":null,"ph":"Phase III","dup":[5294],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 72,887,631.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1104},{"i":5296,"cid":"24BG0007","pid":"P00821170LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. San Guillermo (Phase II), Angadanan, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96479423.61,"abc":96499995.62,"fy":"2024","sd":"06/17/2024","cd":"2024-12-17","lat":16.803967,"lon":121.773381,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[16.80499,121.77426],"wst":"matched","br":"San Guillermo","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3967},{"i":5297,"cid":"24BG0046","pid":"P00821203LZ","t":"Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":144457257.8,"abc":144749997.9,"fy":"2024","sd":"03/12/2024","cd":"2024-09-09","lat":17.010441,"lon":121.775214,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.19,"wp":[17.01197,121.77601],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3968},{"i":5298,"cid":"23BH0233","pid":"P00727107LZ","t":"Construction of Turayong Drainage System Project, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":48914436.85,"abc":48916000.0,"fy":"2023","sd":"09/04/2023","cd":"2024-08-17","lat":16.930526,"lon":121.776791,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3969},{"i":5299,"cid":"24BE0052","pid":"P00821196LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CABAGAN (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":139904118.4,"abc":139925000.0,"fy":"2024","sd":"04/23/2024","cd":"2024-08-28","lat":17.41894,"lon":121.77708,"sm":271,"fm":271,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.08,"wp":[17.41831,121.77664],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3970},{"i":5300,"cid":"23BH0153","pid":"P00726869LZ","t":"Construction of Barangay Salay Flood Control Structure, Section 2, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/15/2023","cd":"2023-12-13","lat":16.442584,"lon":121.777187,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salay Flood Control Structure","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3971},{"i":5301,"cid":"22BE0023","pid":"P00620491LZ","t":"Construction of Barangay Fugu Sur to Fugu Norte Flood Control System, Phase II, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":29299999.82,"abc":29400000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-09-09","lat":17.3375,"lon":121.7776,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fugu Sur","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3972},{"i":5302,"cid":"23BH0194","pid":"P00742121LZ","t":"Construction of Flood Control Structure, Baringin Section 2, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":74229011.56,"abc":74250000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-03-05","lat":16.937458,"lon":121.779126,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3973},{"i":5303,"cid":"21BE0057","pid":"P00561163LZ","t":"Construction of Drainage System at Barangay Ngarag, Cabagan, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":4654926.2,"abc":4900000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-07-14","lat":17.42361,"lon":121.78028,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ngarag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3974},{"i":5304,"cid":"22BH0061","pid":"P00631133LZ","t":"Construction of Brgy. Alicaocao Flood Control Structure, Cauayan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-08-22","lat":16.94895,"lon":121.78124,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alicaocao Flood Control Structure","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3975},{"i":5305,"cid":"22CN0108","pid":"P00631150LZ","t":"Construction of Flood Control Structure, Brgy. Calaocan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"A.R. CASTILLO CONSTRUCTION ENTERPRISES","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-07-22","lat":16.13205,"lon":121.7818,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calaocan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3976},{"i":5306,"cid":"24BH0046","pid":"P00821173LZ","t":"Construction of Carabatan Chica Flood Control Project, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION","c":70829070.0,"abc":70829070.0,"fy":"2024","sd":"03/13/2024","cd":"2024-11-12","lat":16.951572,"lon":121.782003,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3977},{"i":5307,"cid":"24BG0059","pid":"P00821204LZ","t":"Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":144724873.4,"abc":144749998.4,"fy":"2024","sd":"03/27/2024","cd":"2024-07-30","lat":17.009336,"lon":121.782152,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.09,"wp":[17.01015,121.78215],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3978},{"i":5308,"cid":"23BG0184","pid":"P00742308LZ","t":"Construction of Drainage System with Septage and Sewerage, Reina Mercedes, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":19794310.96,"abc":19799993.38,"fy":"2023","sd":"08/09/2023","cd":"2024-01-18","lat":16.985441,"lon":121.782228,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3979},{"i":5309,"cid":"23BH0088","pid":"P00726131LZ","t":"Construction of Alicaocao Flood Control Project, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":29399982.46,"abc":29400000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-08-12","lat":16.950937,"lon":121.783018,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3980},{"i":5310,"cid":"23BB0150","pid":"P00726877LZ","t":"Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package I - Sta. 0+000 - Sta. 0+050.37, Sta. 0+158.91 - Sta. 0+280, Sta. 0+000 - Sta. 0+293","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":72350000.0,"abc":72375000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-01-29","lat":18.052222,"lon":121.783056,"sm":569,"fm":569,"tm":null,"am":569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":464.5,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3981},{"i":5311,"cid":"22BH0123","pid":"P00640509LZ","t":"Construction of Flood Control System, Barangay Carabatan Chica, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":14834053.16,"abc":14850000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-09-27","lat":16.950894,"lon":121.78315,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carabatan Chica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3982},{"i":5312,"cid":"24BH0209","pid":"P00843274LZ","t":"Construction of Papan Weste Flood Control Structure, Section 4, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/20/2024","cd":"2025-02-07","lat":16.533134,"lon":121.785594,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3983},{"i":5313,"cid":"21BE0056","pid":"P00561669LZ","t":"Construction of Drainage System, Brgy. Ngarag, Cabagan, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"Cabagan","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":9404811.4,"abc":9900000.0,"fy":"2021","sd":"01/12/2022","cd":"2022-08-18","lat":17.42118,"lon":121.78631,"sm":271,"fm":null,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ngarag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3984},{"i":5314,"cid":"23BH0188","pid":"P00742120LZ","t":"Construction of Flood Control Structure, Brgy. Nagcampegan, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":74228619.09,"abc":74250000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-12-11","lat":16.968685,"lon":121.78681,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nagcampegan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3985},{"i":5315,"cid":"22BD0090","pid":"P00621415LZ","t":"Pinacanauan River Flood Management Projects, Camasi- Centro, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":91675000.0,"abc":91675000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-09","lat":17.619569,"lon":121.787067,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":16.12,"wp":[17.48509,121.84545],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3986},{"i":5316,"cid":"23BD0078","pid":"P00727099LZ","t":"Construction of Pinacanauan River Flood Management Projects, Camasi-Centro-Dodan, Peñablanca, Cagayan Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) / VHT CAGAYAN BUILDERS CORPORATION","c":48800733.64,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-10-31","lat":17.619496,"lon":121.787123,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":16.11,"wp":[17.48509,121.84545],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3987},{"i":5317,"cid":"22BH0145","pid":"P00637014LZ","t":"Construction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96498540.53,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-06-09","lat":16.971189,"lon":121.787287,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3988},{"i":5318,"cid":"23BH0103","pid":"P00726875LZ","t":"Construction of Barangay Papan Weste Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-08-17","lat":16.533946,"lon":121.787892,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Papan Weste Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3989},{"i":5319,"cid":"22BH0109","pid":"P00639330LZ","t":"Construction of Flood Control Structure at Brgy. Carabatan Chica, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-03-09","lat":16.94974,"lon":121.7879,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carabatan Chica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3990},{"i":5320,"cid":"24BG0072","pid":"P00824875LZ","t":"Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT","c":144744790.0,"abc":144749997.4,"fy":"2024","sd":"03/27/2024","cd":"2024-10-08","lat":17.012562,"lon":121.79103,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.25,"wp":[17.01362,121.78894],"wst":"matched","br":"Turod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3991},{"i":5321,"cid":"23BH0152","pid":"P00726868LZ","t":"Construction of Barangay Salay Flood Control Structure, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96499591.31,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-10-02","lat":16.426874,"lon":121.791262,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salay Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3992},{"i":5322,"cid":"22BH0056","pid":"P00631134LZ","t":"Construction of Brgy. Carabatan Grande Flood Control Structure, Cauayan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) / JWU CONSTRUCTION AND SUPPLY","c":45080000.0,"abc":45080000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-22","lat":16.949146,"lon":121.791388,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carabatan Grande Flood Control Structure","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3993},{"i":5323,"cid":"23BF0048","pid":"P00726419LZ","t":"Construction of Siffu River Flood Control Project (Barangay San Isidro Section), Sta. 0+000 - Sta. 0+600, Barangay San Isidro, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":48249880.15,"abc":47929460.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-12","lat":17.145855,"lon":121.791759,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.04,"wp":[17.14572,121.79142],"wst":"matched","br":"San Isidro Section","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00669,"text":"Contract cost is 0.67% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":843},{"i":5324,"cid":"24BG0009","pid":"P00821198LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Napaccu Section, Reina Mercedes, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONSTRUCTION SERVICES","c":144689532.5,"abc":144749996.4,"fy":"2024","sd":"03/27/2024","cd":"2024-07-15","lat":16.974536,"lon":121.792164,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[16.97337,121.79294],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3994},{"i":5325,"cid":"24BB0083","pid":"P00823336LZ","t":"Construction of Flood Control, Asassi, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48239325.19,"abc":48250000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-12-02","lat":17.90444,"lon":121.79306,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3995},{"i":5326,"cid":"22BH0114","pid":"P00631136LZ","t":"Construction of Brgy. Panang Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 795, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":44099748.06,"abc":44100000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-09-26","lat":16.533771,"lon":121.793302,"sm":1250,"fm":1250,"tm":1250,"am":673,"md":1.83,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panang Flood Control Structure","len":395.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3996},{"i":5327,"cid":"23BG0036","pid":"P00726430LZ","t":"Rehabilitation of Cagayan River Control, Barangay Labinab, Naguillian, Pequeno, Sta. 0+286 - Sta 0+688, Reina Mercedes, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43116440.23,"abc":43136440.76,"fy":"2023","sd":"03/15/2023","cd":"2023-06-07","lat":16.975474,"lon":121.793778,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[16.97435,121.79452],"wst":"matched","br":"Labinab","len":402.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3997},{"i":5328,"cid":"23BB0149","pid":"P00726878LZ","t":"Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package II - Sta. 0+293 - Sta. 0+777","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION / TIKA CONSTRUCTION INC.","c":72355000.0,"abc":72375000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-02-16","lat":18.051944,"lon":121.794167,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":484.0,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3998},{"i":5329,"cid":"23BG0035","pid":"P00726690LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Nappacu Pequeño, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":43439626.45,"abc":44099998.63,"fy":"2023","sd":"03/08/2023","cd":"2023-04-30","lat":16.976425,"lon":121.79552,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.14,"wp":[16.97538,121.79621],"wst":"matched","br":"Nappacu Pequeño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":3999},{"i":5330,"cid":"22BE0007","pid":"P00621056LZ","t":"Construction of Flood Mitigation Structure along Cagayan River (Sta. 0+000 - Sta. 0+150), Bagutari, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":44072412.5,"abc":44100000.0,"fy":"2022","sd":"05/18/2022","cd":"2023-02-05","lat":17.381933,"lon":121.796394,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.17,"wp":[17.3804,121.79669],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4000},{"i":5331,"cid":"23BB0156","pid":"P00726879LZ","t":"Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package III - Sta. 0+777 - Sta. 1+253","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":72353000.0,"abc":72375000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-04-22","lat":18.052945,"lon":121.796461,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":476.0,"ph":"Package III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4001},{"i":5332,"cid":"22DL0183","pid":"P00637083LZ","t":"Construction of Slope Protection along Daang Maharlika (LZ) - K0155+350 - K0155+420, K0156+620 - K0156+660, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ATIMONAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER / DZEE BUILDERS AND CONSTRUCTION SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-03-15","lat":14.008344,"lon":121.796514,"sm":81,"fm":81,"tm":1188,"am":81,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":30.26,"text":"The record contradicts itself: the municipality field and the pin point to Atimonan, Quezon, but the title names Quezon, Quezon, 30 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":519},{"i":5333,"cid":"24BG0043","pid":"P00821208LZ","t":"Construction of Magat River Flood Control Project, Barangay Mallalatang Grande, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":96398901.52,"abc":96499996.07,"fy":"2024","sd":"03/12/2024","cd":"2024-06-17","lat":17.025156,"lon":121.797917,"sm":1203,"fm":1203,"tm":1203,"am":1008,"md":0.26,"ls":"boundary","ww":"Magat","wn":"Magat River","wd":0.02,"wp":[17.02507,121.79774],"wst":"matched","br":"Mallalatang Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4002},{"i":5334,"cid":"24BG0062","pid":"P00845943LZ","t":"Construction of Magat River Flood Control Structure, Brgy. Mallalatang Grande, Reina Mercedes, Isabela (Phase III)","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":49475237.33,"abc":49499999.06,"fy":"2024","sd":"03/18/2024","cd":"2024-07-01","lat":17.025364,"lon":121.797944,"sm":1203,"fm":1203,"tm":1203,"am":1008,"md":0.28,"ls":"boundary","ww":"Magat","wn":"Magat River","wd":0.03,"wp":[17.02523,121.79766],"wst":"matched","br":"Mallalatang Grande","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4003},{"i":5335,"cid":"23BG0043","pid":"P00726705LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Viga, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / BDA JR CONSTRUCTION / INFINITI CONSTRUCTION AND DEVELOPMENT CORPORATION","c":29062893.26,"abc":29207672.46,"fy":"2023","sd":"02/28/2023","cd":"2023-09-04","lat":16.809109,"lon":121.79809,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.21,"wp":[16.80807,121.79974],"wst":"matched","br":"Viga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4004},{"i":5336,"cid":"24BG0178","pid":"P00821165LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Furao, Gamu, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":96451855.56,"abc":96499980.52,"fy":"2024","sd":"09/13/2024","cd":"2025-03-14","lat":17.030167,"lon":121.798683,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":2.8,"wp":[17.03206,121.8249],"wst":"matched","br":"Furao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4005},{"i":5337,"cid":"23BE0006","pid":"P00726684LZ","t":"Construction of Flood Mitigation Structure along Cagayan River-Phase II, Barangay Bagutari, Sto. Tomas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SANTO TOMAS (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48993926.88,"abc":49000000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-08-19","lat":17.3833,"lon":121.7988,"sm":1417,"fm":1417,"tm":1417,"am":1417,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.28,"wp":[17.38085,121.79927],"wst":"matched","br":"Bagutari","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4006},{"i":5338,"cid":"22BG0053","pid":"P00620820LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Napaccu Grande, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":95057153.07,"abc":96499998.25,"fy":"2022","sd":"03/28/2022","cd":"2023-02-16","lat":16.979597,"lon":121.799358,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.29,"wp":[16.97711,121.80034],"wst":"matched","br":"Napaccu Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4007},{"i":5339,"cid":"22BH0143","pid":"P00639331LZ","t":"Construction of Flood Control Structure at Brgy. Papan Este, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-11-21","lat":16.534674,"lon":121.799602,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Papan Este","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4008},{"i":5340,"cid":"23DL0117","pid":"P00740651LZ","t":"Construction of Flood Control Structure, Amao River Bank Protection, Barangay Malicboy, Pagbilao, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PAGBILAO (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"DZEE BUILDERS AND CONSTRUCTION SUPPLY","c":12250000.0,"abc":12250000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-02-10","lat":13.982367,"lon":121.802232,"sm":1058,"fm":1058,"tm":1058,"am":1058,"md":0.0,"ls":"inside","ww":"Amao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malicboy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4009},{"i":5341,"cid":"23BG0082","pid":"P00727261LZ","t":"Construction of Flood Control Project along Cagayan River, Villa Domingo, Angadanan, Isabela, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":95828517.81,"abc":95858916.02,"fy":"2023","sd":"04/25/2023","cd":"2023-11-07","lat":16.818276,"lon":121.802466,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.13,"wp":[16.81804,121.80367],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[5719,5280,5950],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BG0079 to 23BG0082) cover the same site, together worth PHP 382,239,595.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":292},{"i":5342,"cid":"23DM0082","pid":"P00740650LZ","t":"Construction of Flood Control Structure along Guitung River, Barangay Sipa, Padre Burgos, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PADRE BURGOS (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"TONWAY BUILDERS AND SUPPLY","c":12250000.0,"abc":12249981.54,"fy":"2023","sd":"05/03/2023","cd":"2023-07-24","lat":13.9722,"lon":121.803636,"sm":1050,"fm":1050,"tm":1050,"am":1050,"md":0.0,"ls":"inside","ww":"Guitung","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sipa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4010},{"i":5343,"cid":"22BC0084","pid":"P00631109LZ","t":"Construction of Seawall along the Shoreline of Ballesteros, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BALLESTEROS (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS / W.D. NAVARRO CONSTRUCTION CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-12-03","lat":18.413751,"lon":121.517902,"sm":137,"fm":137,"tm":null,"am":137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4011},{"i":5344,"cid":"24BF0033","pid":"P00823339LZ","t":"Construction of Mallig River Flood Control Project, Barangay Binarzang, Quirino, Isabela (Sta. 0+000 - Sta. 1+100)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"A COLOMA CONSTRUCTION / JWU CONSTRUCTION AND SUPPLY","c":96490180.17,"abc":96500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-10-02","lat":17.15641,"lon":121.683496,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.01,"wp":[17.15654,121.68354],"wst":"matched","br":"Binarzang","len":1100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4012},{"i":5345,"cid":"22GB0014","pid":"P00620249VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Pantao, San Jose, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SAN JOSE (CAPITAL) (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":8256078.6,"abc":52110000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-04-22","lat":10.806683,"lon":121.960869,"sm":1301,"fm":1301,"tm":1301,"am":1301,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.08,"wp":[10.80737,121.96111],"wst":"matched","br":"Pantao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4013},{"i":5346,"cid":"22E00136","pid":"P00630957LZ","t":"Construction of Tuguis Flood Control Structure (Phase 2) along Looc- Cogon - Tulay Odiongan Road, Brgy. Progreso Este, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":53074432.75,"abc":53074982.21,"fy":"2022","sd":"05/24/2022","cd":"2022-12-26","lat":12.347304,"lon":122.032595,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Progreso Este","len":null,"ph":"Phase 2","dup":[5353],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 101,306,293.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":888},{"i":5347,"cid":"24EA0052","pid":"P00846096LZ","t":"Construction of Flood Control, Brgy. Bachao-Ibaba, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":4948075.66,"abc":4948000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-04-12","lat":13.308216,"lon":121.870724,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bachao-Ibaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4014},{"i":5348,"cid":"24BG0091","pid":"P00821213LZ","t":"Construction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+000 - Sta. 0+468.30), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96441752.68,"abc":96499996.49,"fy":"2024","sd":"06/24/2024","cd":"2024-10-25","lat":16.775325,"lon":121.684011,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.04,"wp":[16.77568,121.68416],"wst":"matched","br":"Sta. Maria","len":468.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4015},{"i":5349,"cid":"22GB0017","pid":"P00620298VS","t":"Construction of Revetment at Bugo Bridge (Abutment A, Upstream) along Sibalom River, San Remigio, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"SAN REMIGIO (ANTIQUE)","deo":"Antique District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2023-02-25","lat":10.873633,"lon":122.125132,"sm":1354,"fm":1354,"tm":1354,"am":1354,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.21,"wp":[10.8755,122.12495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4016},{"i":5350,"cid":"23DM0040","pid":"P00736026LZ","t":"Construction of Seawall at Barangay Marao (Package 1), Padre Burgos, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PADRE BURGOS (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96499903.46,"fy":"2023","sd":"03/01/2023","cd":"2023-12-11","lat":13.911176,"lon":121.81562,"sm":1050,"fm":1050,"tm":1050,"am":1050,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marao","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4017},{"i":5351,"cid":"24BC0065","pid":"P00825053LZ","t":"Construction of Seawall along the Shoreline of Ballesteros, Cagayan","w":"Construction of Flood Mitigation Facility","rg":"Region II","pv":"CAGAYAN","mu":"BALLESTEROS (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS","c":48234966.56,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-20","lat":18.40708,"lon":121.51827,"sm":137,"fm":137,"tm":null,"am":137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4018},{"i":5352,"cid":"24BF0063","pid":"P00824887LZ","t":"Construction of Siffu River Flood Control Project, Barangay Masigun Phase II, Sta. 0+960 - Sta. 1+760, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":96480164.87,"abc":96500000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-05-13","lat":17.109228,"lon":121.68546,"sm":1222,"fm":1222,"tm":1222,"am":1195,"md":0.12,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.29,"wp":[17.11188,121.68539],"wst":"matched","br":"Masigun Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4019},{"i":5353,"cid":"22E00144","pid":"P00620672LZ","t":"Construction of Tuguis Flood Control Structures along Looc (Cogon Tulay)-Odiongan Road, Barangay Progreso Este, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":48231860.27,"abc":48249750.25,"fy":"2022","sd":"05/24/2022","cd":"2022-12-16","lat":12.347304,"lon":122.032595,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Progreso Este","len":null,"ph":null,"dup":[5346],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 101,306,293.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":926},{"i":5354,"cid":"23EA0040","pid":"P00737548LZ","t":"Construction of Flood Control Structure, Barangay Bachao Ilaya, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":4948142.9,"abc":4948000.0,"fy":"2023","sd":"01/31/2023","cd":"2023-04-21","lat":13.308228,"lon":121.870783,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bachao Ilaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4020},{"i":5355,"cid":"24BG0021","pid":"P00820782LZ","t":"Construction of Magat RIS, Magat River Slope Protection Works, Ramon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"RAMON (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT","c":3424520.75,"abc":3429985.0,"fy":"2024","sd":"03/27/2024","cd":"2024-05-08","lat":16.831033,"lon":121.520211,"sm":1198,"fm":1198,"tm":1198,"am":1198,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.98,"wp":[16.83881,121.51586],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4021},{"i":5356,"cid":"23BD0060","pid":"P00727351LZ","t":"Construction of Flood Control Structures along Pinacanauan River, Barangay Quibal, Peñablanca, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PEÑABLANCA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"QUASAR CONSTRUCTION AND SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-10-19","lat":17.707873,"lon":121.815744,"sm":1118,"fm":1118,"tm":1118,"am":1118,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":24.69,"wp":[17.4884,121.85792],"wst":"matched","br":"Quibal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4022},{"i":5357,"cid":"24BA0009","pid":"P00820774LZ","t":"Construction of Itbud Seawall, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":9749525.43,"abc":9800000.0,"fy":"2024","sd":"06/10/2024","cd":"2024-11-20","lat":20.366739,"lon":121.960983,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4023},{"i":5358,"cid":"21GB0007","pid":"P00521581VS","t":"Construction of Revetment along Sibalom River, Barangay San Rafael, San Remegio, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"San Remigio","deo":"Antique District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":48507211.59,"abc":49000000.0,"fy":"2021","sd":"06/21/2021","cd":"2022-09-19","lat":10.873513,"lon":122.125218,"sm":1354,"fm":null,"tm":1354,"am":1354,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.22,"wp":[10.87551,122.12503],"wst":"matched","br":"San Rafael","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4024},{"i":5359,"cid":"22BA0031","pid":"P00632790LZ","t":"Construction of Flood Control along Upper Creek at Sitio Lalag, Barangay Itbud, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"REMAR CONSTRUCTION","c":4894683.33,"abc":4900000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-06","lat":20.367863,"lon":121.963994,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":"Upper","wn":"Upper Creek","wd":0.01,"wp":[20.36788,121.96393],"wst":"matched","br":"Itbud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4025},{"i":5360,"cid":"23BE0049","pid":"P00726447LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Brgy. Naguilian Sur, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":96169397.8,"abc":96200000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-09-19","lat":17.1539,"lon":121.8722,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.3,"wp":[17.15186,121.87399],"wst":"matched","br":"Naguilian Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4026},{"i":5361,"cid":"22EH0113","pid":"P00621492LZ","t":"Construction of Jun Carlo, Flood Control Structure (Upstream), San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"ATHENA CONSTRUCTION AND DEVELOPMENT","c":24500000.0,"abc":24499999.28,"fy":"2022","sd":"06/20/2022","cd":"2022-12-15","lat":12.5319,"lon":122.0328,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4027},{"i":5362,"cid":"23CN0111","pid":"P00740577LZ","t":"Construction of Drainage Structure, Brgy. 2, San Luis, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"RADIANCE TRADERS & BUILDERS","c":2852860.02,"abc":2940000.0,"fy":"2023","sd":"05/16/2023","cd":"2023-07-30","lat":15.71956,"lon":121.52124,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4028},{"i":5363,"cid":"23E00131","pid":"P00740420LZ","t":"Construction of Sta Cruz Seawall, Barangay Tagum - Barangay Morales Section, Sta Cruz, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":241247258.7,"abc":241249999.6,"fy":"2023","sd":"04/13/2023","cd":"2024-05-06","lat":13.4513,"lon":122.1276,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tagum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4029},{"i":5364,"cid":"23BG0091","pid":"P00726428LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Labinab, Pequeno, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":52702403.1,"abc":52722403.1,"fy":"2023","sd":"03/15/2023","cd":"2023-07-05","lat":16.978292,"lon":121.816983,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.22,"wp":[16.97652,121.81614],"wst":"matched","br":"Labinab","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4030},{"i":5365,"cid":"23BA0001","pid":"P00737438LZ","t":"Construction of Retaining Wall and Road Concreting of Diajan, Barangay San Antonio, Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"BASCO (CAPITAL) (BATANES)","deo":"Batanes District Engineering Office","co":"R.L. PACANA'S CONSTRUCTION & DEVELOPMENT","c":5899148.0,"abc":5899148.0,"fy":"2023","sd":"02/15/2023","cd":"2023-09-23","lat":20.455773,"lon":121.964748,"sm":173,"fm":173,"tm":173,"am":173,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4031},{"i":5366,"cid":"23BB0081","pid":"P00726667LZ","t":"Construction of Flood Control Structure along Cagayan River, Dugo, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":35264241.7,"abc":35280000.0,"fy":"2023","sd":"04/02/2023","cd":"2024-07-29","lat":18.254444,"lon":121.685833,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.26,"wp":[18.25514,121.68351],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5371,5113,5107],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BB0079 to 23BB0082) cover the same site, together worth PHP 179,649,545.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":617},{"i":5367,"cid":"24EH0084","pid":"P00823566LZ","t":"Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":125450000.0,"abc":125449999.2,"fy":"2024","sd":"03/13/2024","cd":"2024-11-15","lat":12.3994,"lon":122.0342,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4032},{"i":5368,"cid":"20BA0027","pid":"P00421687LZ","t":"Construction (Completion) of Basco Seawall and Fishing Boat Shelter Basco, Barangay San Antonio, Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"Basco","deo":"Batanes District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":27153948.61,"abc":27428233.68,"fy":"2020","sd":"03/11/2020","cd":"2022-10-31","lat":20.448697,"lon":121.96572,"sm":173,"fm":null,"tm":173,"am":173,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4033},{"i":5369,"cid":"22C00094","pid":"P00620497LZ","t":"Construction of Flood Mitigation Structure and Drainage System, Diteki-Aguang River Improvement Project, Baler and San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48146608.28,"abc":48245843.28,"fy":"2022","sd":"08/15/2022","cd":"2023-05-08","lat":15.762861,"lon":121.521669,"sm":1320,"fm":1320,"tm":null,"am":127,"md":1.48,"ls":"adjacent","ww":"Diteki-Aguang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4034},{"i":5370,"cid":"22EA0236","pid":"P00639510LZ","t":"Construction of Flood Control Structure at Brgy. Bachao Ilaya, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"T.N.G. CONSTRUCTION CORPORATION","c":5877868.15,"abc":5878000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-04","lat":13.3071,"lon":121.8723,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bachao Ilaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4035},{"i":5371,"cid":"23BB0079","pid":"P00726668LZ","t":"Construction of Flood Control Structure along Cagayan River, Bulala, Camalaniugan, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"CAMALANIUGAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":35255302.94,"abc":35280000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-01","lat":18.255278,"lon":121.686111,"sm":312,"fm":312,"tm":312,"am":312,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.27,"wp":[18.25553,121.68361],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5113,5366,5107],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BB0079 to 23BB0082) cover the same site, together worth PHP 179,649,545.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":618},{"i":5372,"cid":"22GK0013","pid":"P00620003VS","t":"Construction of Flood Control Structure of Malisbog River Phase 1, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES / ESJ AND SONS CONSTRUCTION & CONSTRUCTION SUPPLY, INC. (FORM.:ALFIE'S CONST. &CONST. SUPPLY, INC.)","c":87080562.0,"abc":87082562.53,"fy":"2022","sd":"02/22/2022","cd":"2022-12-13","lat":10.813056,"lon":122.036944,"sm":1456,"fm":1456,"tm":1456,"am":1443,"md":99.06,"ls":"outside","ww":"Malisbog","wn":"Malisbog River","wd":99.9,"wp":[10.80587,122.95079],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":78,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":99.06,"text":"The pin is 99.1 km outside Silay City, Negros Occidental, the nearest municipality the record claims. It falls in Sibalom, Antique.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":99.9,"text":"The title names Malisbog, which OpenStreetMap maps through the stated municipality, but the pin is 99.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":25},{"i":5373,"cid":"23JA0057","pid":"P00721591MN","t":"Construction of Flood Mitigation Structure, Brgy. Tulungatung, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"UNITEC BUILDER, INCORPORATED","c":26485720.03,"abc":29400000.0,"fy":"2023","sd":"06/30/2023","cd":"2023-12-13","lat":6.975833,"lon":121.965833,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tulungatung","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4036},{"i":5374,"cid":"24BH0235","pid":"P00843228LZ","t":"Construction of Linomot Flood Control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96499766.88,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-15","lat":16.535569,"lon":121.81801,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4037},{"i":5375,"cid":"23BH0105","pid":"P00726872LZ","t":"Construction of Barangay Sto. Domingo Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96499800.46,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-08-14","lat":16.509478,"lon":121.87294,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4038},{"i":5376,"cid":"24BH0195","pid":"P00843249LZ","t":"Construction of Dipangit Flood Control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/20/2024","cd":"2024-12-07","lat":16.559453,"lon":121.686802,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4039},{"i":5377,"cid":"23CN0110","pid":"P00740576LZ","t":"Construction of Flood Control Structure, Brgy. Culat, Casiguran, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"CASIGURAN (AURORA)","deo":"Aurora District Engineering Office","co":"GERRA CONSTRUCTION INCORPORATED (FORMERLY: GERRA CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-02-21","lat":16.283052,"lon":122.13013,"sm":346,"fm":346,"tm":346,"am":346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4040},{"i":5378,"cid":"23BG0093","pid":"P00726700LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Macayucayu, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":43371200.6,"abc":43811511.9,"fy":"2023","sd":"04/11/2023","cd":"2023-11-21","lat":16.857686,"lon":122.037988,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Macayucayu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4041},{"i":5379,"cid":"24EA0033","pid":"P00820390LZ","t":"Construction of Bamban Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION / R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR","c":67544604.27,"abc":67548000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-10-23","lat":13.432412,"lon":121.873102,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4042},{"i":5380,"cid":"23BG0042","pid":"P00726702LZ","t":"Construction River Flood Control Project along Ganano River Bank, barangay Apanay, Alicia, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":19461769.94,"abc":19471769.94,"fy":"2023","sd":"03/15/2023","cd":"2023-06-01","lat":16.769158,"lon":121.6871,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.28,"wp":[16.77124,121.68862],"wst":"matched","br":"Apanay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4043},{"i":5381,"cid":"21BA0039","pid":"P00525946LZ","t":"Rehabilitation of San Antonio Flood Control, Brgy. San Antonio Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":null,"deo":"Batanes District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":24931200.0,"abc":29400000.0,"fy":"2021","sd":"02/24/2021","cd":"2022-07-31","lat":20.45159,"lon":121.967636,"sm":null,"fm":null,"tm":null,"am":173,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio Basco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":137},{"i":5382,"cid":"22PM0033","pid":"P00621526LZ","t":"Construction of Katao Flood Control Structure, Sta. 085 + 870, Brgy. Buringal, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"06/16/2022","cd":"2022-10-30","lat":17.12444,"lon":121.52194,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buringal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4044},{"i":5383,"cid":"23BH0190","pid":"P00742123LZ","t":"Construction of Flood Control Structure, Brgy. Cassap Fuera, Cauayan City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF CAUAYAN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":74228662.29,"abc":74250000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-08-30","lat":16.92246,"lon":121.819714,"sm":381,"fm":381,"tm":381,"am":381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cassap Fuera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4045},{"i":5384,"cid":"23E00198","pid":"P00726952LZ","t":"Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ALCANTARA (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":289497468.8,"abc":289500000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-12-10","lat":12.5669,"lon":122.1305,"sm":1252,"fm":27,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":23.11,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names Alcantara, Romblon, 23 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":417},{"i":5385,"cid":"22PM0015","pid":"P00620137LZ","t":"Construction of Dannal Flood Control Structure, Sta. 076+960 - Sta. 077+660 (R.S.), Anonat, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / GAWIS CONSTRUCTION SERVICES","c":69960570.0,"abc":69960570.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-19","lat":17.11972,"lon":121.52278,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4046},{"i":5386,"cid":"22BE0017","pid":"P00632799LZ","t":"Construction of Flood Control Structure with Channelization of Waterway along Balasig- Magassi Creek, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CABAGAN (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":14799954.57,"abc":14849954.58,"fy":"2022","sd":"02/15/2022","cd":"2022-08-27","lat":17.36784,"lon":121.82054,"sm":271,"fm":271,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":"Balasig-Magassi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4047},{"i":5387,"cid":"23GB0021","pid":"P00721730VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Sido-Barangay Cadolonan, Sibalom, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"02/09/2023","cd":"2024-05-03","lat":10.81075,"lon":122.03877,"sm":1443,"fm":1443,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.09,"wp":[10.81094,122.03797],"wst":"matched","br":"Sido-Barangay Cadolonan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4048},{"i":5388,"cid":"24BG0092","pid":"P00821214LZ","t":"Construction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+468.30 - Sta. 0+928.90), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY / ALGO CONSTRUCTION AND POWER DEVELOPMENT, INC.","c":96442247.44,"abc":96499996.15,"fy":"2024","sd":"07/15/2024","cd":"2024-10-25","lat":16.773811,"lon":121.687231,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.04,"wp":[16.77381,121.68761],"wst":"matched","br":"Sta. Maria","len":460.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4049},{"i":5389,"cid":"22BA0027","pid":"P00632789LZ","t":"Construction of Flood Control (Shoreline Protection) at Sitio Diptan, Barangay Sinakan, Sabtang, Batanes","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"BHM CONSTRUCTION","c":4978478.33,"abc":5940000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-12-04","lat":20.332805,"lon":121.873872,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinakan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4050},{"i":5390,"cid":"23GB0036","pid":"P00733295VS","t":"Construction of Flood Control Structure along Binangbang River, Barangay Poblacion, Barbaza, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BARBAZA (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":14700000.0,"abc":14850000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-08-25","lat":11.198352,"lon":122.040961,"sm":162,"fm":162,"tm":162,"am":162,"md":0.0,"ls":"inside","ww":"Binangbang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4051},{"i":5391,"cid":"22BA0039","pid":"P00632788LZ","t":"Construction of Flood Control (Sewerage Net/Screen) along Rayasan Bridge, Barangay Kaychanarianan, Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"BASCO (CAPITAL) (BATANES)","deo":"Batanes District Engineering Office","co":"R.L. PACANA'S CONSTRUCTION & DEVELOPMENT","c":4947421.64,"abc":4950000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-12-04","lat":20.446443,"lon":121.967924,"sm":173,"fm":173,"tm":173,"am":173,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaychanarianan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4052},{"i":5392,"cid":"24EI0074","pid":"P00825251LZ","t":"Construction of Madugo I River Control, Barangay Malaya Section, Roxas, Oriental MIndoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"ROXAS (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48997656.29,"abc":49000000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-12-21","lat":12.598583,"lon":121.523361,"sm":1223,"fm":1223,"tm":1223,"am":1223,"md":0.0,"ls":"inside","ww":"Madugo I","wn":"Madugo River","wd":0.77,"wp":[12.59298,121.51922],"wst":"matched","br":"Malaya Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4053},{"i":5393,"cid":"22EA0243","pid":"P00639518LZ","t":"Construction of Sumangga Flood Control Structure, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":24729962.75,"abc":29398000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-02-10","lat":13.473786,"lon":121.8752,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4054},{"i":5394,"cid":"24GB0013","pid":"P00820387VS","t":"Construction of Flood Control Structure along Sibalom River, Bry. San Juan, Sibalom, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"SENTINA CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-28","lat":10.8038,"lon":122.04097,"sm":1443,"fm":1443,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.25,"wp":[10.80354,122.03874],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4055},{"i":5395,"cid":"23GB0023","pid":"P00721729VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Pantao, San Jose, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SAN JOSE (CAPITAL) (ANTIQUE)","deo":"Antique District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":57900000.0,"abc":86850000.0,"fy":"2023","sd":"02/09/2023","cd":"2024-02-28","lat":10.80688,"lon":121.9681,"sm":1301,"fm":1301,"tm":1301,"am":1301,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.03,"wp":[10.80718,121.96808],"wst":"matched","br":"Pantao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4056},{"i":5396,"cid":"23DM0041","pid":"P00736027LZ","t":"Construction of Seawall at Barangay Marao (Package 2), Padre Burgos, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PADRE BURGOS (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"BOMEL CONSTRUCTION / MAR-VEL CONSTRUCTION & SUPPLY","c":96500000.0,"abc":96499903.53,"fy":"2023","sd":"03/06/2023","cd":"2023-12-11","lat":13.905008,"lon":121.821499,"sm":1050,"fm":1050,"tm":1050,"am":1050,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marao","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4057},{"i":5397,"cid":"22GB0012","pid":"P00620078VS","t":"Construction of Flood Control Structures along Cangaranan River at Valderrama Bridge, Abutment B, Upstream, Valderrama, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"VALDERRAMA (ANTIQUE)","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-08-26","lat":11.011224,"lon":122.131614,"sm":1620,"fm":1620,"tm":1620,"am":1620,"md":0.0,"ls":"inside","ww":"Cangaranan","wn":"Cangaranan River","wd":0.18,"wp":[11.01236,122.13044],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4058},{"i":5398,"cid":"24BH0187","pid":"P00843250LZ","t":"Construction of Dipangit Flood Control Structure, Section 3, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-08-22","lat":16.563831,"lon":121.68915,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4059},{"i":5399,"cid":"24BA0024","pid":"P00820773LZ","t":"Construction of Guardwall along Uyugan-Mahatao Interior Rd, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":37632000.0,"abc":37632000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-12-11","lat":20.383368,"lon":121.968672,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4060},{"i":5400,"cid":"24GB0012","pid":"P00820276VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Bugo, San Remigio, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SAN REMIGIO (ANTIQUE)","deo":"Antique District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":82025000.0,"abc":82025000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-09-24","lat":10.8899,"lon":122.1322,"sm":1354,"fm":1354,"tm":1354,"am":1354,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.13,"wp":[10.88982,122.13335],"wst":"matched","br":"Bugo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4061},{"i":5401,"cid":"23CN0078","pid":"P00737445LZ","t":"Construction of Flood Control Structure, So. Setan, Brgy. Calabuanan, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-06-22","lat":15.756388,"lon":121.524584,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calabuanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4062},{"i":5402,"cid":"23EA0048","pid":"P00727175LZ","t":"Construction of Flood Control Structure along Boac River, Barangay Balimbing, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48018673.52,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-26","lat":13.432601,"lon":121.876174,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.22,"wp":[13.43067,121.87677],"wst":"matched","br":"Balimbing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4063},{"i":5403,"cid":"22EA0187","pid":"P00637808LZ","t":"Construction of Flood Control Structure at Brgy. Tigwi, Torrijos, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":47519311.81,"abc":47517999.99,"fy":"2022","sd":"03/30/2022","cd":"2023-05-30","lat":13.269,"lon":122.0432,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tigwi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4064},{"i":5404,"cid":"22BH0146","pid":"P00621448LZ","t":"Construction of Flood Control Structure, Brgy. Sinsayon, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-10-26","lat":16.694022,"lon":121.525498,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinsayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4065},{"i":5405,"cid":"22BB0098","pid":"P00632797LZ","t":"Construction of Slope Protection at Calaoagan Dackel National High Shool-Capissayan Annex, Barangay Capissayan Sur, Gattaran, Cagayan","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"CAGAYAN","mu":"GATTARAN (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":4875750.0,"abc":4950000.0,"fy":"2022","sd":"10/10/2022","cd":"2023-05-28","lat":18.022985,"lon":121.822733,"sm":569,"fm":569,"tm":569,"am":569,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capissayan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4066},{"i":5406,"cid":"22GB0049","pid":"P00631710VS","t":"Construction of Flood Control Structure, Barangay Cubay, Barbaza, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BARBAZA (ANTIQUE)","deo":"Antique District Engineering Office","co":"GATEWAY 21-25 CONSTRUCTION CORP. (FORMERLY E.D. DE","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-23","lat":11.198473,"lon":122.043919,"sm":162,"fm":162,"tm":162,"am":162,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cubay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4067},{"i":5407,"cid":"22CN0116","pid":"P00631158LZ","t":"Construction of Flood Control Structure, Brgy. Toytoyan, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-12-12","lat":15.878019,"lon":121.525901,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Toytoyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4068},{"i":5408,"cid":"23BH0148","pid":"P00740318LZ","t":"Construction of Flood Control Structure, Barangay Arubub, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96489771.32,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-15","lat":16.541618,"lon":121.689322,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Arubub","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4069},{"i":5409,"cid":"23C00009","pid":"P00725760LZ","t":"Construction of Casalogan River Control, Casiguran, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"CASIGURAN (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":289499825.2,"abc":289499825.2,"fy":"2023","sd":"02/27/2023","cd":"2024-02-21","lat":16.28241,"lon":122.132614,"sm":346,"fm":346,"tm":346,"am":346,"md":0.0,"ls":"inside","ww":"Casalogan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4070},{"i":5410,"cid":"24EA0075","pid":"P00820389LZ","t":"Construction of Balimbing Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":87809976.28,"abc":87813000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-08-05","lat":13.431117,"lon":121.878309,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4071},{"i":5411,"cid":"23EA0052","pid":"P00727179LZ","t":"Construction of Flood Control Structure along Mogpog River, Barangay Mangyan Mababad, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS)","c":48018034.7,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-11","lat":13.476985,"lon":121.881243,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":"Mogpog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangyan Mababad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4072},{"i":5412,"cid":"24GB0084","pid":"P00834991VS","t":"Construction of Flood Control Structure along Binangbang River, Barbaza, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BARBAZA (ANTIQUE)","deo":"Antique District Engineering Office","co":"MINDANAO ROCK","c":49500000.0,"abc":49500000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-10-23","lat":11.1983,"lon":122.04419,"sm":162,"fm":162,"tm":162,"am":162,"md":0.0,"ls":"inside","ww":"Binangbang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4073},{"i":5413,"cid":"24EA0037","pid":"P00820964LZ","t":"Construction of Laon Mataas na Bayan CIS Protection Works, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"T.N.G. CONSTRUCTION CORPORATION","c":9602077.29,"abc":9798000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-07-05","lat":13.477008,"lon":121.882247,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4074},{"i":5414,"cid":"23BE0050","pid":"P00726446LZ","t":"Construction of Flood Mitigation Structure along Ilagan River, Brgy. Cabisera 9-11, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":96174122.0,"abc":96200000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-10-25","lat":17.0554,"lon":121.969,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.09,"wp":[17.05492,121.96836],"wst":"matched","br":"Cabisera 9-11","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4075},{"i":5415,"cid":"23BB0085","pid":"P00726113LZ","t":"Construction of Flood Control at Asassi, Baggao, Cagayan","w":"Construction of Revetment","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION / VHT CAGAYAN BUILDERS CORPORATION","c":48990000.0,"abc":49000000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-06-15","lat":17.912462,"lon":121.822905,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4076},{"i":5416,"cid":"22GB0054","pid":"P00633212VS","t":"Construction of Seawall Protection Structure, Brgy. Poblacion, Malabor and Natividad, Tibiao, Antique","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ANTIQUE","mu":"TIBIAO (ANTIQUE)","deo":"Antique District Engineering Office","co":"GATEWAY 21-25 CONSTRUCTION CORP. (FORMERLY E.D. DE","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-11","lat":11.272927,"lon":122.04488,"sm":1563,"fm":1563,"tm":1563,"am":1563,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4077},{"i":5417,"cid":"24BH0234","pid":"P00843227LZ","t":"Construction of Linomot Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96499503.07,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-15","lat":16.537626,"lon":121.824222,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4078},{"i":5418,"cid":"22EA0188","pid":"P00641900LZ","t":"Construction of Flood Control Structure, Brgy. Bintakay, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":9813540.74,"abc":10888000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-13","lat":13.501071,"lon":121.882719,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bintakay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4079},{"i":5419,"cid":"21J00002","pid":"P00522033MN","t":"Construction of Flood Control Structure along Ayala River, Tulungatung Section, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"TEDDIE CONSTRUCTION DEVELOPMENT, INC.","c":57867414.58,"abc":60793971.23,"fy":"2021","sd":"03/26/2021","cd":"2022-12-22","lat":6.980922,"lon":121.969664,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Ayala","wn":"Ayala River","wd":0.01,"wp":[6.98092,121.9696],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4080},{"i":5420,"cid":"22CN0114","pid":"P00631156LZ","t":"Construction of Flood Control Structure, Brgy. Salay, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-06-12","lat":15.83504,"lon":121.53014,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4081},{"i":5421,"cid":"24BH0211","pid":"P00843223LZ","t":"Construction of Dipangit Flood Control Structure, Section 4, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/19/2024","cd":"2024-11-11","lat":16.57024,"lon":121.689348,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4082},{"i":5422,"cid":"22BB0013","pid":"P00621022LZ","t":"Construction of Flood Control at Zone 1 along National Road of Barangay Barsat East, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":48989897.82,"abc":49000000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-10-27","lat":17.933105,"lon":121.884136,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barsat East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4083},{"i":5423,"cid":"24JH0032","pid":"P00821187MN","t":"Construction of Flood Control Structure at Aguada River, Aguada Br. Section (B00001BL) along Basilan Circumferential Road (S00002BL), Isabela City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"BASILAN","mu":"CITY OF ISABELA (CAPITAL) (CITY OF ISABELA)","deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / MMP CONSTRUCTION AND SUPPLIES","c":96481614.48,"abc":96500000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-12-17","lat":6.704705,"lon":121.969883,"sm":null,"fm":null,"tm":null,"am":390,"md":null,"ls":"unknown","ww":"Aguada","wn":"Aguada River","wd":0.02,"wp":[6.70476,121.97003],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":138},{"i":5424,"cid":"22BA0060","pid":"P00632795LZ","t":"Construction of Yasyas Flood Control (Phase II), Barangay Kaychanarianan, Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"BASCO (CAPITAL) (BATANES)","deo":"Batanes District Engineering Office","co":"R.L. PACANA'S CONSTRUCTION & DEVELOPMENT","c":9824370.18,"abc":9835000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-12-18","lat":20.4412,"lon":121.970084,"sm":173,"fm":173,"tm":173,"am":173,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kaychanarianan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4084},{"i":5425,"cid":"22GA0066","pid":"P00630627VS","t":"Construction of Flood Control along Aslum River (Delta Permanent Opening), Barangay Aslum, Ibajay, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"ALCEL CONSTRUCTION","c":19799567.39,"abc":19800000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-13","lat":11.825785,"lon":122.132633,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Aslum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Aslum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4085},{"i":5426,"cid":"23BE0009","pid":"P00726687LZ","t":"Construction of Flood Control Project along Ilagan River, barangay Cabisera 7, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48993521.45,"abc":49000000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-06-15","lat":17.0514,"lon":121.9717,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.14,"wp":[17.05206,121.97057],"wst":"matched","br":"Cabisera 7","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4086},{"i":5427,"cid":"23EA0061","pid":"P00742451LZ","t":"Construction of Damaged Flood Control Structure, Brgy. Balimbing, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":24515665.5,"abc":24748000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-01","lat":13.42937,"lon":121.884416,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balimbing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4087},{"i":5428,"cid":"22DL0149","pid":"P00620619LZ","t":"Construction of Shoreline/Seawall in Brgy. Villa Gomez, Quezon, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"QUEZON (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":5281353.03,"abc":5390000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-04","lat":14.07828,"lon":122.133532,"sm":1188,"fm":1188,"tm":1188,"am":1188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Gomez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4088},{"i":5429,"cid":"24PJ0020","pid":"P00823323LZ","t":"Construction of Calupaan Flood Control, Sta. 44+217.5 - Sta. 44+670, Calupaan, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"MAYOYAO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION","c":53675230.0,"abc":53661879.92,"fy":"2024","sd":"02/23/2024","cd":"2024-08-20","lat":16.857066,"lon":121.530912,"sm":34,"fm":963,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":452.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":21.46,"text":"The record contradicts itself: the title and the pin point to Alfonso Lista, Ifugao, but the municipality field names Mayoyao, Ifugao, 21 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":520},{"i":5430,"cid":"21BH0179","pid":"P00525966LZ","t":"Construction of Buyon Creek Flood Control Project, Castillo, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Echague","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":31210839.89,"abc":31211040.0,"fy":"2021","sd":"03/09/2022","cd":"2022-09-30","lat":16.729677,"lon":121.690079,"sm":545,"fm":null,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":"Buyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4089},{"i":5431,"cid":"23EA0050","pid":"P00727177LZ","t":"Construction of Flood Control Structure along Boac River, Barangay Tabigue, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":48019649.71,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-26","lat":13.451593,"lon":121.825481,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.07,"wp":[13.45219,121.82575],"wst":"matched","br":"Tabigue","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4090},{"i":5432,"cid":"23EH0119","pid":"P00727196LZ","t":"Construction of Jun Carlo Flood Control, San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR / TABLAS MEGA CONSTRUCTION","c":48993380.67,"abc":48999999.71,"fy":"2023","sd":"06/13/2023","cd":"2023-12-04","lat":12.52056,"lon":122.04722,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4091},{"i":5433,"cid":"22EH0064","pid":"P00637086LZ","t":"Construction of Poblacion San Agustin, Flood Interceptor, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ULTIMATE BUILDER'S & CONST. SUPPLY","c":24481966.53,"abc":24499999.5,"fy":"2022","sd":"04/06/2022","cd":"2023-05-11","lat":12.566111,"lon":122.133611,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4092},{"i":5434,"cid":"22BG0066","pid":"P00632800LZ","t":"Construction of Box Culvert of Barangay Makindol, Benito Soliven, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BENITO SOLIVEN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":4949770.78,"abc":4949995.64,"fy":"2022","sd":"02/14/2022","cd":"2022-08-19","lat":16.958578,"lon":121.973843,"sm":199,"fm":199,"tm":199,"am":199,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Makindol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4093},{"i":5435,"cid":"24BB0085","pid":"P00823338LZ","t":"Construction of Flood Control at Zone 2, Barsat East, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48240000.0,"abc":48250000.0,"fy":"2024","sd":"03/28/2024","cd":"2024-12-02","lat":17.93278,"lon":121.884444,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4094},{"i":5436,"cid":"23BF0046","pid":"P00726416LZ","t":"Construction of Siffu River Flood Control Project (Barangay San Juan Section), Sta. 0+000 - Sta.0+600, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":47563150.1,"abc":47929460.0,"fy":"2023","sd":"03/13/2023","cd":"2023-07-31","lat":17.114385,"lon":121.690392,"sm":1195,"fm":1195,"tm":1195,"am":262,"md":0.45,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.1,"wp":[17.11361,121.69089],"wst":"matched","br":"San Juan Section","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4095},{"i":5437,"cid":"23BD0066","pid":"P00742301LZ","t":"Construction of Sewerage Canal within Brgy. Poblacion, Enrile, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ENRILE (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"DOUBLE J1908 CONSTRUCTION","c":9788290.17,"abc":9900000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-20","lat":17.552228,"lon":121.692956,"sm":547,"fm":547,"tm":547,"am":547,"md":0.0,"ls":"inside","ww":"Sewerage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4096},{"i":5438,"cid":"21JA0123","pid":"P00522144MN","t":"Construction of Slope Protection, Sitio Uwak River, San Roque, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"LL CONSTRUCTION","c":4875209.31,"abc":4900000.0,"fy":"2021","sd":"10/28/2021","cd":"2022-07-04","lat":6.938333,"lon":122.047778,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Sitio Uwak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4097},{"i":5439,"cid":"22PJ0009","pid":"P00637066LZ","t":"Construction of Namillangan Flood Control Sta. 43+700- Sta. 44+217.5 (R/S) Namillangan, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"C-BROS CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-29","lat":16.86122,"lon":121.5311,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":517.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4098},{"i":5440,"cid":"22BB0019","pid":"P00621028LZ","t":"Construction of Flood Control,Tueg, Bitag Grande, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":48984996.36,"abc":49000000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-09-26","lat":17.911593,"lon":121.825592,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4099},{"i":5441,"cid":"23BF0021","pid":"P00726421LZ","t":"Construction of Siffu River Flood Control Project (Barangay San Juan Section), Sta. 0+000 - Sta. 0+600, Barangay San Juan, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":47864304.56,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-11-23","lat":17.113627,"lon":121.69387,"sm":1195,"fm":1195,"tm":1195,"am":262,"md":0.5,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.05,"wp":[17.11332,121.69358],"wst":"matched","br":"San Juan Section","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4100},{"i":5442,"cid":"23GF0052","pid":"P00721928VS","t":"Construction of Brgy. Baybay Shoreline Protection, Brgy. Baybay, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":24266621.31,"abc":24500000.0,"fy":"2023","sd":"03/15/2023","cd":"2024-03-02","lat":10.585651,"lon":122.13435,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baybay Shoreline Protection","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4101},{"i":5443,"cid":"22DM0042","pid":"P00620602LZ","t":"Construction of Seawall in Brgy. Ibabang Kalilayan, Unisan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"UNISAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":27440000.0,"abc":27439935.51,"fy":"2022","sd":"02/09/2022","cd":"2022-11-05","lat":13.841028,"lon":121.974434,"sm":1615,"fm":1615,"tm":1615,"am":1615,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ibabang Kalilayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4102},{"i":5444,"cid":"24DL0032","pid":"P00820911LZ","t":"Construction of Breakwater, Barangay Inaclagan, Gumaca, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-07-10","lat":13.944,"lon":122.0479,"sm":607,"fm":607,"tm":607,"am":607,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inaclagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4103},{"i":5445,"cid":"24BB0078","pid":"P00824679LZ","t":"Construction of Flood Control Zone 2, Barangay Dalla, Baggao, Cagyan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":44095000.0,"abc":44100000.0,"fy":"2024","sd":"02/11/2024","cd":"2024-05-28","lat":17.95639,"lon":121.88528,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4104},{"i":5446,"cid":"23PM0020","pid":"P00725658LZ","t":"Construction of Carupian Flood Control, Sta. 74 + 155 - Sta. 74 + 646 (L.S.), Anonat, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"BALINTUGAN CONSTRUCTION","c":62725000.0,"abc":62725000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-09-24","lat":17.11906,"lon":121.53176,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":491.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4105},{"i":5447,"cid":"22EA0241","pid":"P00639516LZ","t":"Construction of Santol Flood Control Structure, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JBERNARDO CONSTRUCTION AND SUPPLY","c":19598862.07,"abc":19598000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-05","lat":13.450541,"lon":121.827071,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4106},{"i":5448,"cid":"24BF0053","pid":"P00824891LZ","t":"Construction of Siffu River Flood Control Project, Barangay San Juan Phase II, Sta. 0+600 - Sta. 1+400, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96474480.71,"abc":96500000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-08-14","lat":17.112084,"lon":121.695213,"sm":1195,"fm":1195,"tm":1195,"am":262,"md":0.66,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.11191,121.69499],"wst":"matched","br":"San Juan Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4107},{"i":5449,"cid":"22EH0017","pid":"P00631319LZ","t":"Construction of Flood Mitigation Structure along Budiong River (Phase 2), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":41886289.12,"abc":42139999.5,"fy":"2022","sd":"02/23/2022","cd":"2022-08-01","lat":12.3953,"lon":121.9756,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":"Budiong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4108},{"i":5450,"cid":"22G00016","pid":"P00620297VS","t":"Construction of Flood Control Structure along Tibiao River, Barangay Sta. Justa, Tibiao, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"TIBIAO (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":29685504.72,"abc":33775000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":11.3019,"lon":122.048689,"sm":1563,"fm":1563,"tm":1563,"am":1563,"md":0.0,"ls":"inside","ww":"Tibiao","wn":"Tibiao","wd":0.04,"wp":[11.30152,122.0487],"wst":"matched","br":"Sta. Justa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4109},{"i":5451,"cid":"22BB0012","pid":"P00621021LZ","t":"Construction of Flood Control at Nangalinan, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":29385000.0,"abc":29400000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-08-10","lat":17.925318,"lon":121.885839,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4110},{"i":5452,"cid":"20G00101","pid":"P00420351VS","t":"Construction of Revetment Wall along Cangaranan River at Cangaranan Bridge (Abutment A), Bugasong, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"Bugasong","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":115799648.0,"abc":115800000.0,"fy":"2020","sd":"11/23/2020","cd":"2022-08-01","lat":11.011,"lon":122.05,"sm":243,"fm":null,"tm":243,"am":243,"md":0.0,"ls":"inside","ww":"Cangaranan","wn":"Cangaranan River","wd":0.24,"wp":[11.0124,122.05162],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":392},{"i":5453,"cid":"24BC0072","pid":"P00824683LZ","t":"Construction of Seawall along Shoreline of Ballesteros, Cagayan (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BALLESTEROS (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JEICCA BUILDERS","c":48406589.72,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-28","lat":18.40622,"lon":121.53203,"sm":137,"fm":137,"tm":null,"am":137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4111},{"i":5454,"cid":"24DM0117","pid":"P00846087LZ","t":"Construction of Seawall and Baywalk, Brgy. F. De Jesus, Unisan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"UNISAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":49500000.0,"abc":48999958.83,"fy":"2024","sd":"05/09/2024","cd":"2024-11-19","lat":13.83632,"lon":121.97665,"sm":1615,"fm":1615,"tm":1615,"am":1615,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"F. De Jesus","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":774},{"i":5455,"cid":"24BH0160","pid":"P00848610LZ","t":"Construction of Napaliong Flood Control Structure, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":88986939.82,"abc":89100000.0,"fy":"2024","sd":"06/06/2024","cd":"2024-10-25","lat":16.538105,"lon":121.827213,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4112},{"i":5456,"cid":"23GF0051","pid":"P00721927VS","t":"Construction/Improvement of San Joaquin Shoreline Protection including Access Road, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":29112116.85,"abc":29400000.0,"fy":"2023","sd":"03/15/2023","cd":"2024-02-29","lat":10.585564,"lon":122.135685,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4113},{"i":5457,"cid":"24BF0054","pid":"P00824879LZ","t":"Construction of Mallig River Flood Control Project, Barangay San Juan Phase II, Sta. 1+100 - Sta. 1+900, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY / ALGO CONSTRUCTION AND POWER DEVELOPMENT, INC.","c":96470259.43,"abc":96500000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-08-14","lat":17.110284,"lon":121.695213,"sm":1195,"fm":1195,"tm":1195,"am":262,"md":0.86,"ls":"boundary","ww":"Mallig","wn":"Mallig River","wd":2.59,"wp":[17.13367,121.69625],"wst":"matched","br":"San Juan Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4114},{"i":5458,"cid":"24EA0074","pid":"P00820388LZ","t":"Construction of Balagasan Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD","c":87810398.0,"abc":87813000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-20","lat":13.426072,"lon":121.885893,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4115},{"i":5459,"cid":"20G00101","pid":"P00420351VS","t":"Construction of Revetment Wall along Cangaranan River at Cangaranan Bridge (Abutment A), Bugasong, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"Bugasong","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":115799648.0,"abc":115800000.0,"fy":"2021","sd":"11/23/2020","cd":"2022-08-01","lat":11.011,"lon":122.05,"sm":243,"fm":null,"tm":243,"am":243,"md":0.0,"ls":"inside","ww":"Cangaranan","wn":"Cangaranan River","wd":0.24,"wp":[11.0124,122.05162],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":393},{"i":5460,"cid":"23BC0019","pid":"P00725670LZ","t":"Construction of Seawall along the Shoreline of Ballesteros, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BALLESTEROS (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION / JEICCA BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-06-13","lat":18.40493,"lon":121.5346,"sm":137,"fm":137,"tm":null,"am":137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4116},{"i":5461,"cid":"22EA0013","pid":"P00632924LZ","t":"Construction of Ihatub Flood Control, Barangay Ihatub, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"TRIPLE JOHNES Q. CONSTRUCTION","c":5818384.17,"abc":5938000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-10-15","lat":13.4266,"lon":121.8274,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ihatub","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4117},{"i":5462,"cid":"23GA0114","pid":"P00721924VS","t":"Construction of Revetment Wall along Tagbaya River, Barangay Tagbaya, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. / C.S. GARCIA CONSTRUCTION CORPORATION (FORMERLY: C.S. GARCIA CONSTRUCTION)","c":48999995.52,"abc":49000000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-10-17","lat":11.809624,"lon":122.13824,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Tagbaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tagbaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4118},{"i":5463,"cid":"24BG0068","pid":"P00821212LZ","t":"Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+465.50 - Sta. 0+928.20), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489406.74,"abc":96499996.27,"fy":"2024","sd":"06/24/2024","cd":"2024-08-05","lat":16.76755,"lon":121.695525,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.19,"wp":[16.76796,121.69383],"wst":"matched","br":"San Antonio Upstream","len":462.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4119},{"i":5464,"cid":"22BB0022","pid":"P00621032LZ","t":"Construction of River Flood Control System at Zone 2 and Zone 3 Dalla, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":14259000.0,"abc":14700000.0,"fy":"2022","sd":"02/02/2022","cd":"2023-05-28","lat":17.956162,"lon":121.887441,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4120},{"i":5465,"cid":"21BH0176","pid":"P00525566LZ","t":"Construction of Sinsayon Flood Control Structure, Sinsayon, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"City of Santiago","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-09-30","lat":16.692913,"lon":121.534698,"sm":420,"fm":null,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4121},{"i":5466,"cid":"22DM0064","pid":"P00620601LZ","t":"Construction of Seawall in Brgy. F. De Jesus, Unisan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"UNISAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":44246020.0,"abc":44245961.62,"fy":"2022","sd":"02/10/2022","cd":"2023-01-01","lat":13.83561,"lon":121.977221,"sm":1615,"fm":1615,"tm":1615,"am":1615,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"F. De Jesus","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4122},{"i":5467,"cid":"22GB0009","pid":"P00620001VS","t":"Construction of Flood Control Structure along Paliwan River, Barangay Guinbangaan, Laua-an, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"LAUA-AN (ANTIQUE)","deo":"Antique District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":34571918.59,"abc":50180000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-14","lat":11.074856,"lon":122.051821,"sm":760,"fm":760,"tm":760,"am":243,"md":0.17,"ls":"boundary","ww":"Paliwan","wn":"Paliwan","wd":3.99,"wp":[11.06964,122.08799],"wst":"matched","br":"Guinbangaan","len":null,"ph":null,"dup":[5474],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 73,771,919.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":972},{"i":5468,"cid":"23JJ0028","pid":"P00721657MN","t":"Construction of Flood Control Structure in Siocon River, Mendiola Bridge, Siocon, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SIOCON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 4th District Engineering Office","co":"R.B. MORALLO CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-01-15","lat":7.7133,"lon":122.1417,"sm":1463,"fm":1463,"tm":1463,"am":1463,"md":0.0,"ls":"inside","ww":"Siocon","wn":"Siocon River","wd":0.14,"wp":[7.7121,122.14146],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4123},{"i":5469,"cid":"22DM0006","pid":"P00631312LZ","t":"Construction of Flood Control of Hinguin River, Brgy. Hinguiwin Padre Burgos, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PADRE BURGOS (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / WYDERWAYS BUILDERS AND SUPPLIES","c":19600000.0,"abc":19599729.78,"fy":"2022","sd":"02/09/2022","cd":"2022-07-25","lat":13.9478,"lon":121.8276,"sm":1050,"fm":1050,"tm":1188,"am":1050,"md":0.0,"ls":"inside","ww":"Hinguin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Hinguiwin Padre Burgos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":29.08,"text":"The record contradicts itself: the municipality field and the pin point to Padre Burgos, Quezon, but the title names Quezon, Quezon, 29 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":609},{"i":5470,"cid":"22BK0085","pid":"P00621073LZ","t":"Construction of San Pedro River Control (along Cagayan River), San Pedro, Maddela, Downstream, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"MADDELA (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":48995706.5,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-11-18","lat":16.352021,"lon":121.697062,"sm":857,"fm":857,"tm":857,"am":857,"md":0.0,"ls":"inside","ww":"San Pedro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4124},{"i":5471,"cid":"22BB0023","pid":"P00621031LZ","t":"Construction of River Control at Dalla, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-24","lat":17.955359,"lon":121.887516,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4125},{"i":5472,"cid":"21E00076","pid":"P00561446LZ","t":"Construction of Pili Flood Control, Looc, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"Looc","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":86823658.97,"abc":135098806.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-22","lat":13.075,"lon":121.5347,"sm":806,"fm":null,"tm":806,"am":1140,"md":96.73,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":96.73,"text":"The pin is 96.7 km outside Looc, Romblon, the nearest municipality the record claims. It falls in Pinamalayan, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":115},{"i":5473,"cid":"22E00150","pid":"P00639383LZ","t":"Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":106147622.3,"abc":106149973.3,"fy":"2022","sd":"05/24/2022","cd":"2023-06-07","lat":12.386336,"lon":121.980937,"sm":1034,"fm":1034,"tm":1213,"am":1034,"md":0.0,"ls":"inside","ww":"Bangon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":33.28,"text":"The record contradicts itself: the municipality field and the pin point to Odiongan, Romblon, but the title names Romblon, Romblon, 33 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":437},{"i":5474,"cid":"22GB0035","pid":"P00630197VS","t":"Rehabilitation of Flood Control Project along Paliwan-Paningayan River, Brgy. Guinbanga-An, Laua-An, Antique","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ANTIQUE","mu":"LAUA-AN (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-12-05","lat":11.074856,"lon":122.051821,"sm":760,"fm":760,"tm":760,"am":243,"md":0.17,"ls":"boundary","ww":"Paliwan-Paningayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guinbanga-An","len":null,"ph":null,"dup":[5467],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 73,771,919.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":973},{"i":5475,"cid":"24EA0032","pid":"P00821362LZ","t":"Construction of Flood Control Structure Along Mogpog River, Brgy. Magapua, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96495098.79,"abc":96498000.0,"fy":"2024","sd":"02/19/2024","cd":"2025-05-01","lat":13.475498,"lon":121.88783,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":"Mogpog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magapua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4126},{"i":5476,"cid":"22BB0078","pid":"P00631104LZ","t":"Construction of Drainage System 1 at Centro, Santa Ana, Cagayan","w":"Construction of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTA ANA (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) / TJMT CONSTRUCTION","c":42115100.0,"abc":42135100.0,"fy":"2022","sd":"04/01/2022","cd":"2023-05-08","lat":18.45738,"lon":122.14245,"sm":1367,"fm":1367,"tm":1367,"am":1367,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4127},{"i":5477,"cid":"21CN0005","pid":"P00526393LZ","t":"Construction of Malupa-Dian-Aguang River Control, Sta. 3+900 - Sta. 4+050, Sta. 6+200 - Sta. 6+326, Sta. 8+800 - Sta. 9+046.50, Sta. 9+138 - Sta. 9+185.50, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"Baler","deo":"Aurora District Engineering Office","co":"IRC CONSTRUCTION & SUPPLIES","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"07/12/2021","cd":"2022-08-31","lat":15.76461,"lon":121.53517,"sm":127,"fm":null,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":"Malupa-Dian-Aguang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":570.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4128},{"i":5478,"cid":"23BE0005","pid":"P00726125LZ","t":"Construction of Flood Control System in Barangay Camasi, Phase II, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":19594522.13,"abc":19600000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-05-22","lat":17.3323,"lon":121.888,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camasi","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4129},{"i":5479,"cid":"22BD0096","pid":"P00621242LZ","t":"Construction of Drainage System along Pallua, Tuguegarao City, Cagayan, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"JTM CONSTRUCTION","c":24125000.0,"abc":24125000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-07-03","lat":17.625786,"lon":121.697217,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4130},{"i":5480,"cid":"23E00008","pid":"P00740437LZ","t":"Construction of Sta. Cruz Shore Protecion/Boulevard, Barangay Buyabod, Santa Cruz, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":192998641.0,"abc":192999999.7,"fy":"2023","sd":"04/13/2023","cd":"2023-12-20","lat":13.476,"lon":122.05367,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buyabod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4131},{"i":5481,"cid":"24GB0055","pid":"P00834990VS","t":"Construction of Seawall, Brgy. Poblacion, Municipality of Patnongon, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"PATNONGON (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":14812420.01,"abc":14850000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-08-27","lat":10.9148,"lon":121.9814,"sm":1115,"fm":1115,"tm":1115,"am":1115,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4132},{"i":5482,"cid":"23JJ0011","pid":"P00721363MN","t":"Construction of Flood Control Structure at Panabutan River, Sirawai, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SIRAWAI (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 4th District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/18/2023","cd":"2023-10-06","lat":7.59541,"lon":122.14821,"sm":1466,"fm":1466,"tm":1466,"am":1466,"md":0.0,"ls":"inside","ww":"Panabutan","wn":"Panabutan River","wd":0.01,"wp":[7.59543,122.14812],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4133},{"i":5483,"cid":"22C00095","pid":"P00620498LZ","t":"Construction of Flood Mitigation Structure and Drainage System, Malupa-Dian-Aguang River Improvement Project, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"IM CONSTRUCTION CORPORATION","c":48218372.02,"abc":48249095.57,"fy":"2022","sd":"08/15/2022","cd":"2023-08-08","lat":15.765011,"lon":121.536319,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":"Malupa-Dian-Aguang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4134},{"i":5484,"cid":"22BG0070","pid":"P00632801LZ","t":"Construction of Drainage Canal, Barangay District 1 - District 2 Poblacion, Reina Mercedes, Isabela","w":"Construction of Drainage Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":4879992.14,"abc":4949987.53,"fy":"2022","sd":"02/14/2022","cd":"2022-08-08","lat":16.984596,"lon":121.828352,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4135},{"i":5485,"cid":"23BB0065","pid":"P00726111LZ","t":"Construction of Flood Control Structure at Dalla, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"DECA CONSTRUCTION / TJMT CONSTRUCTION","c":48979917.36,"abc":49000000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-06-13","lat":17.955307,"lon":121.888072,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4136},{"i":5486,"cid":"24BG0069","pid":"P00821211LZ","t":"Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+067.90, Sta. 0+070.90 - Sta. 0+465.60), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489676.01,"abc":96499993.83,"fy":"2024","sd":"06/24/2024","cd":"2024-08-05","lat":16.769309,"lon":121.697358,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.04,"wp":[16.76929,121.69771],"wst":"matched","br":"San Antonio Upstream","len":462.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4137},{"i":5487,"cid":"23BG0108","pid":"P00742307LZ","t":"Construction of Flood Control Structure along Brgy. Disabungan River at Brgy. Disusuan, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":4900708.0,"abc":4949989.76,"fy":"2023","sd":"04/25/2023","cd":"2023-07-10","lat":16.973086,"lon":122.054176,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Brgy. Disabungan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Disabungan River at Brgy. Disusuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4138},{"i":5488,"cid":"23JA0040","pid":"P00732472MN","t":"Construction of Flood Control Structure, Barangay San Jose Gusu, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":4850980.27,"abc":4900000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-09-13","lat":6.927464,"lon":122.054714,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose Gusu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4139},{"i":5489,"cid":"23JA0037","pid":"P00732470MN","t":"Construction of Drainage System, Barangay Baliwasan, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"MEGABALTZ CONSTRUCTION","c":4826250.44,"abc":4829317.26,"fy":"2023","sd":"03/23/2023","cd":"2023-08-17","lat":6.914722,"lon":122.059167,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baliwasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4140},{"i":5490,"cid":"24BG0067","pid":"P00821566LZ","t":"Construction of Disabungan to Catalangan River Flood Control Project, Barangay Disusuan, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":48965415.32,"abc":48999997.81,"fy":"2024","sd":"03/18/2024","cd":"2024-05-06","lat":16.975953,"lon":122.059386,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Catalangan","wn":"Catalangan River","wd":0.04,"wp":[16.97559,122.0592],"wst":"matched","br":"Disusuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4141},{"i":5491,"cid":"22G00012","pid":"P00630186VS","t":"Rehabilitation of Flood Control Structure, Laua-An River, Poblacion; Cairawan River, Casit-An, Laua-an, Antique","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ANTIQUE","mu":"LAUA-AN (ANTIQUE)","deo":"Antique District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":125450000.0,"abc":125450000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-08-16","lat":11.115889,"lon":122.060481,"sm":760,"fm":760,"tm":760,"am":760,"md":0.0,"ls":"inside","ww":"Laua-An","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4142},{"i":5492,"cid":"22GB0011","pid":"P00620077VS","t":"Construction of Flood Control Structure along Cangaranan River, Bugasong, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BUGASONG (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-12-12","lat":11.005903,"lon":122.064728,"sm":243,"fm":243,"tm":243,"am":243,"md":0.0,"ls":"inside","ww":"Cangaranan","wn":"Cangaranan River","wd":0.12,"wp":[11.00481,122.06495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4143},{"i":5493,"cid":"23GF0100","pid":"P00733715VS","t":"Construction of San Joaquin River Control, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"DEACONS TEMPLE CONSTRUCTION & SUPPLY","c":9879364.55,"abc":9900000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-12-02","lat":10.522613,"lon":122.064839,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.0,"ls":"inside","ww":"San Joaquin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4144},{"i":5494,"cid":"23EH0016","pid":"P00726277LZ","t":"Construction of Bañadero Flood Control Structure along Tablas Circumferential Road (Downstream), Calatrava, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"CALATRAVA (ROMBLON)","deo":"Romblon District Engineering Office","co":"R.G. FLORENTINO CONST. & TRADING INC.","c":48997970.32,"abc":48999999.54,"fy":"2023","sd":"02/22/2023","cd":"2023-08-15","lat":12.61778,"lon":122.06583,"sm":300,"fm":300,"tm":300,"am":300,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4145},{"i":5495,"cid":"24EA0035","pid":"P00821363LZ","t":"Construction of Flood Control Structure Along Tawiran River, Sta. Cruz, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Marinduque District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96495228.29,"abc":96498000.0,"fy":"2024","sd":"02/19/2024","cd":"2025-04-20","lat":13.454758,"lon":122.067727,"sm":1379,"fm":1377,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":"Tawiran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":796.86,"text":"The record contradicts itself: the title and the pin point to Santa Cruz, Marinduque, but the municipality field names Santa Cruz, Davao del Sur, 797 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":458},{"i":5496,"cid":"22EA0086","pid":"P00620902LZ","t":"Construction of Tawiran Flood Control, Sta. 0+000 - Sta. 0+900, Sta. Cruz, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"SANTA CRUZ (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SARGASSO CONSTRUCTION & DEVELOPMENT CORP.","c":84891244.45,"abc":84879400.0,"fy":"2022","sd":"02/23/2022","cd":"2023-08-24","lat":13.4559,"lon":122.0685,"sm":1379,"fm":1379,"tm":1379,"am":1379,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4146},{"i":5497,"cid":"22GF0113","pid":"P00620428VS","t":"Construction of Quianan River Flood Control Project, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"CHAMPION BUILDERS AND SUPPLY","c":4879197.7,"abc":4900000.0,"fy":"2022","sd":"05/23/2022","cd":"2022-10-17","lat":10.572537,"lon":122.070025,"sm":1296,"fm":1296,"tm":1296,"am":1296,"md":0.0,"ls":"inside","ww":"Quianan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4147},{"i":5498,"cid":"22EA0185","pid":"P00637806LZ","t":"Construction of Flood Control Structure at Brgy. Buangan, Torrijos, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":19797898.73,"abc":19798000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-30","lat":13.314946,"lon":122.070339,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4148},{"i":5499,"cid":"21BG0106","pid":"P00561673LZ","t":"Construction of Flood Mitigation Structure at Brgy. Binatug, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"San Mariano","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":29697068.51,"abc":29699995.31,"fy":"2021","sd":"01/19/2022","cd":"2022-07-25","lat":16.95316,"lon":122.072375,"sm":1327,"fm":null,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Binatug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4149},{"i":5500,"cid":"23EH0084","pid":"P00727193LZ","t":"Construction of Bonlao Flood Control Structure along Tablas Circumferential Road, Phase 2, Alcantara, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ALCANTARA (ROMBLON)","deo":"Romblon District Engineering Office","co":"ULTIMATE BUILDER'S & CONST. SUPPLY","c":48993745.79,"abc":48999999.67,"fy":"2023","sd":"03/24/2023","cd":"2023-09-26","lat":12.30167,"lon":122.07389,"sm":27,"fm":27,"tm":27,"am":27,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4150},{"i":5501,"cid":"22EH0047","pid":"P00621489LZ","t":"Construction of Bonlao Flood Control Structure along Tabllas Circumferential Road, Alcantara, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ALCANTARA (ROMBLON)","deo":"Romblon District Engineering Office","co":"ULTIMATE BUILDER'S & CONST. SUPPLY","c":24361307.16,"abc":24499999.5,"fy":"2022","sd":"04/06/2022","cd":"2022-10-10","lat":12.3011,"lon":122.0739,"sm":27,"fm":27,"tm":27,"am":27,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4151},{"i":5502,"cid":"22GB0015","pid":"P00620295VS","t":"Construction of Flood Control Structure along Bacong River, CuIasi, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"CULASI (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-08-01","lat":11.41267,"lon":122.074758,"sm":465,"fm":465,"tm":null,"am":465,"md":0.0,"ls":"inside","ww":"Bacong","wn":"Bacong River","wd":0.03,"wp":[11.41243,122.07485],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4152},{"i":5503,"cid":"23JJ0010","pid":"P00721361MN","t":"Construction of Flood Control Structure at Anongan River, Anongan, Sibuco, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SIBUCO (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 4th District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"02/18/2023","cd":"2023-07-10","lat":7.46178,"lon":122.07533,"sm":1445,"fm":1445,"tm":1445,"am":1445,"md":0.0,"ls":"inside","ww":"Anongan","wn":"Anongan River","wd":0.01,"wp":[7.46185,122.07528],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4153},{"i":5504,"cid":"23BG0002","pid":"P00726694LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Binatug, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":48265637.8,"abc":48999999.29,"fy":"2023","sd":"03/08/2023","cd":"2023-06-05","lat":16.955968,"lon":122.075642,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Binatug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4154},{"i":5505,"cid":"24GB0030","pid":"P00820150VS","t":"Construction of Flood Control Structures along Sibalom River, Brgy. Nasuli, San Remigio, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SAN REMIGIO (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-09-03","lat":10.8324,"lon":122.0758,"sm":1354,"fm":1354,"tm":1354,"am":1354,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.7,"wp":[10.83838,122.07372],"wst":"matched","br":"Nasuli","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4155},{"i":5506,"cid":"22GG0115","pid":"P00620247VS","t":"Construction of Flood Control Structure along Jalaur River, Barotac Nuevo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC NUEVO (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":19011837.7,"abc":19600000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-08-24","lat":10.918555,"lon":122.0763,"sm":168,"fm":168,"tm":168,"am":1115,"md":63.3,"ls":"outside","ww":"Jalaur","wn":"Jalaur River","wd":43.02,"wp":[11.19323,122.3552],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":63.3,"text":"The pin is 63.3 km outside Barotac Nuevo, Iloilo, the nearest municipality the record claims. It falls in Patnongon, Antique.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.89,"value":43.02,"text":"The title names Jalaur, which OpenStreetMap maps through the stated municipality, but the pin is 43.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":98},{"i":5507,"cid":"23JA0041","pid":"P00732471MN","t":"Construction of Flood Control Structure, Villa Sta. Maria, Barangay Sta. Maria, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"RME CONSTRUCTION AND ENTERPRISES","c":10884616.96,"abc":10890000.0,"fy":"2023","sd":"05/05/2023","cd":"2023-09-25","lat":6.938611,"lon":122.076389,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4156},{"i":5508,"cid":"24JA0071","pid":"P00835858MN","t":"Construction of Flood Mitigation Structure along Tumaga River (Sta. Maria Section), Barangay Santa Maria, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"RME CONSTRUCTION AND ENTERPRISES","c":17633690.21,"abc":17640000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-10-21","lat":6.936732,"lon":122.076523,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Tumaga","wn":"Tumaga River","wd":0.01,"wp":[6.9367,122.07662],"wst":"matched","br":"Santa Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4157},{"i":5509,"cid":"24CN0156","pid":"P00845956LZ","t":"Construction of Flood Control Structure, Brgy. Dibacong, Casiguran, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"CASIGURAN (AURORA)","deo":"Aurora District Engineering Office","co":"ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE / BAMM BUSINESS VENTURES INC.","c":49500000.0,"abc":49500000.0,"fy":"2024","sd":"04/15/2024","cd":"2025-02-02","lat":16.2479,"lon":122.07657,"sm":346,"fm":346,"tm":346,"am":346,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dibacong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4158},{"i":5510,"cid":"18J00009","pid":"P00223199MN","t":"Flood Control for Urban Core and Central District of Zamboanga City to include Pumping Station and RROW, Zamboanga City (Package II)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) / BENDIMIL CONSTRUCTION & DEVELOPMENT CORP.","c":198360500.0,"abc":202409605.5,"fy":"2018","sd":"10/11/2018","cd":"2023-11-19","lat":6.92144,"lon":122.07903,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4159},{"i":5511,"cid":"22EA0186","pid":"P00637807LZ","t":"Construction of Flood Control Structure at Brgy. Marlangga, Torrijos, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"TRIPLE JOHNES Q. CONSTRUCTION","c":14563237.53,"abc":14847999.99,"fy":"2022","sd":"03/30/2022","cd":"2022-12-02","lat":13.328,"lon":122.0817,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marlangga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4160},{"i":5512,"cid":"22EH0032","pid":"P00620263LZ","t":"Construction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+271 - Sta. 0+698 (R/S), Sta. 0+470 - Sta. 0+510 (L/S), Sta. 0+525 - Sta. 0+700 (L/S), Sta. Maria, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SANTA MARIA (IMELDA) (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96013026.19,"abc":96017499.33,"fy":"2022","sd":"06/03/2022","cd":"2023-03-29","lat":12.3775,"lon":122.0819,"sm":1398,"fm":1398,"tm":1398,"am":1398,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":642.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4161},{"i":5513,"cid":"22GB0010","pid":"P00620076VS","t":"Construction of Flood Control Structure along Cangaranan River, Barangay Bagtason, Bugasong, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BUGASONG (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-11-21","lat":11.000076,"lon":122.082142,"sm":243,"fm":243,"tm":243,"am":243,"md":0.0,"ls":"inside","ww":"Cangaranan","wn":"Cangaranan River","wd":0.06,"wp":[11.00011,122.08163],"wst":"matched","br":"Bagtason","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4162},{"i":5514,"cid":"22GB0034","pid":"P00630196VS","t":"Construction of Flood Control Structure, Brgy. Jaguiquican, Laua-An, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"LAUA-AN (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":44467535.89,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-09-12","lat":11.07386,"lon":122.08652,"sm":760,"fm":760,"tm":760,"am":243,"md":0.15,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jaguiquican","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4163},{"i":5515,"cid":"23E00010","pid":"P00736050LZ","t":"Construction of Torrijos Shore Protection/Boulevard, Barangay Poblacion, Torrijos, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":192997379.6,"abc":192999999.1,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.3175,"lon":122.0878,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4164},{"i":5516,"cid":"24EA0028","pid":"P00839654LZ","t":"Construction of Flood Control Structure, Barangay Poblacion, Torrijos, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SAMARAH CONSTRUCTION AND SUPPLY","c":6927884.53,"abc":6928000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-07-05","lat":13.323884,"lon":122.087827,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[5517],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 11,875,702.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":248},{"i":5517,"cid":"24EA0053","pid":"P00846097LZ","t":"Construction of Flood Control, Brgy. Ihatub, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":4947817.66,"abc":4948000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-04-12","lat":13.323884,"lon":122.087827,"sm":214,"fm":214,"tm":214,"am":1582,"md":8.94,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ihatub","len":null,"ph":null,"dup":[5516],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":8.94,"text":"The pin is 8.9 km outside Boac, Marinduque, the nearest municipality the record claims. It falls in Torrijos, Marinduque.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 11,875,702.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":128},{"i":5518,"cid":"23E00129","pid":"P00740418LZ","t":"Construction of Torrijos Seawall, Barangay Poblacion Section, Torrijos, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":241246840.5,"abc":241249999.6,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":13.3233,"lon":122.090469,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4165},{"i":5519,"cid":"23JA0044","pid":"P00732474MN","t":"Construction of Drainage System, Barangay Tetuan, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"HMI ENTERPRISES","c":9899967.65,"abc":9800000.0,"fy":"2023","sd":"04/24/2023","cd":"2023-11-24","lat":6.919644,"lon":122.090546,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tetuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":974},{"i":5520,"cid":"22JA0023","pid":"P00620260MN","t":"Construction of Flood Control at Tumaga River Basin, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"AEJ HARDWARE CONSTRUCTION & ENTERPRISES","c":19595510.37,"abc":19517852.63,"fy":"2022","sd":"03/23/2022","cd":"2023-03-17","lat":6.92444,"lon":122.091667,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Tumaga","wn":"Tumaga River","wd":0.01,"wp":[6.92456,122.09164],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4166},{"i":5521,"cid":"24DL0064","pid":"P00820291LZ","t":"Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY","c":67550000.0,"abc":67550000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-07-10","lat":13.9166,"lon":122.0927,"sm":607,"fm":607,"tm":607,"am":607,"md":0.0,"ls":"inside","ww":"Pipisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4167},{"i":5522,"cid":"22GA0021","pid":"P00620008VS","t":"Construction of Revetment Wall along Alimbo River (Upstream/Downstream), Brgy. Alimbo, Nabas, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"NABAS (AKLAN)","deo":"Aklan District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":53743402.6,"abc":54839020.0,"fy":"2022","sd":"02/21/2022","cd":"2023-05-02","lat":11.820723,"lon":122.092841,"sm":999,"fm":999,"tm":999,"am":999,"md":0.0,"ls":"inside","ww":"Alimbo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alimbo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4168},{"i":5523,"cid":"24GB0007","pid":"P00820152VS","t":"Construction of Seawall Brgy. Poblacion, Sebaste, Antique","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SEBASTE (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":45570000.0,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-11-05","lat":11.5893,"lon":122.093,"sm":1432,"fm":1432,"tm":1432,"am":1432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4169},{"i":5524,"cid":"23DL0089","pid":"P00727169LZ","t":"Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon, Package A","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-09-13","lat":13.918714,"lon":122.093139,"sm":607,"fm":607,"tm":1188,"am":607,"md":0.0,"ls":"inside","ww":"Pipisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.48,"text":"The record contradicts itself: the municipality field and the pin point to Gumaca, Quezon, but the title names Quezon, Quezon, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":565},{"i":5525,"cid":"22DL0069","pid":"P00620209LZ","t":"Construction of Flood Control along Pipisik River, Gumaca, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY / R.T.Y.  CONSTRUCTION","c":92839755.0,"abc":92839755.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-19","lat":13.918681,"lon":122.093203,"sm":607,"fm":607,"tm":607,"am":607,"md":0.0,"ls":"inside","ww":"Pipisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[5526],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 112,439,755.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":813},{"i":5526,"cid":"22DL0070","pid":"P00620608LZ","t":"Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-07-11","lat":13.918681,"lon":122.093203,"sm":607,"fm":607,"tm":607,"am":607,"md":0.0,"ls":"inside","ww":"Pipisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[5525],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 112,439,755.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1028},{"i":5527,"cid":"23DL0101","pid":"P00726939LZ","t":"Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon, Package B","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUMACA (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":82025000.0,"abc":82025000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-13","lat":13.919978,"lon":122.093478,"sm":607,"fm":607,"tm":1188,"am":607,"md":0.0,"ls":"inside","ww":"Pipisik","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.34,"text":"The record contradicts itself: the municipality field and the pin point to Gumaca, Quezon, but the title names Quezon, Quezon, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":478},{"i":5528,"cid":"22JA0040","pid":"P00631079MN","t":"Construction of Drainage System at San Antonio de Padua Village, Barangay Putik, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"SHERKAD CONSTRUCTION","c":4948757.89,"abc":4736646.36,"fy":"2022","sd":"03/24/2022","cd":"2023-01-22","lat":6.943272,"lon":122.094069,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putik","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.57,"value":1.04478,"text":"Contract cost is 4.48% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":687},{"i":5529,"cid":"22JA0038","pid":"P00631077MN","t":"Construction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"TERRAINSHAPER CONSTRUCTION AND ENTERPRISES","c":4801870.31,"abc":4457665.7,"fy":"2022","sd":"03/23/2022","cd":"2022-10-19","lat":6.931944,"lon":122.094167,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guiwan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.74,"value":1.07722,"text":"Contract cost is 7.72% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":565},{"i":5530,"cid":"22EH0042","pid":"P00631316LZ","t":"Construction of Banton Poblacion Shore Protection / Causeway Extension, Banton, Romblon","w":"Construction of Slope Protection Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"BANTON (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":36258916.06,"abc":36259999.04,"fy":"2022","sd":"03/10/2022","cd":"2022-10-25","lat":12.9428,"lon":122.0958,"sm":159,"fm":159,"tm":159,"am":159,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4170},{"i":5531,"cid":"24GB0005","pid":"P00820149VS","t":"Construction of Flood Control Structures along Sibalom River, Brgy. Maragubdub, San Remigio, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SAN REMIGIO (ANTIQUE)","deo":"Antique District Engineering Office","co":"GATEWAY 21-25 CONSTRUCTION CORP. (FORMERLY E.D. DE","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-15","lat":10.8479,"lon":122.0966,"sm":1354,"fm":1354,"tm":1354,"am":1354,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.14,"wp":[10.84885,122.09574],"wst":"matched","br":"Maragubdub","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4171},{"i":5532,"cid":"22CN0119","pid":"P00631161LZ","t":"Construction of Flood Control Structure, Sitio Tagbak, Brgy. Ura, Dilasag, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DILASAG (AURORA)","deo":"Aurora District Engineering Office","co":"ZF CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-07-13","lat":16.31602,"lon":122.09684,"sm":506,"fm":506,"tm":506,"am":506,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ura","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4172},{"i":5533,"cid":"24GB0006","pid":"P00820151VS","t":"Construction of Seawall Brgy. Idio, Sebaste, Antique","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SEBASTE (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":45570000.0,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2025-01-05","lat":11.62263,"lon":122.09686,"sm":1432,"fm":1432,"tm":1432,"am":1432,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Idio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4173},{"i":5534,"cid":"22DM0071","pid":"P00631311LZ","t":"Construction of Flood Control at Amontay River, Brgy. Poctol, Pitogo Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PITOGO (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":9800000.0,"abc":9799946.19,"fy":"2022","sd":"02/10/2022","cd":"2022-07-25","lat":13.817594,"lon":122.099256,"sm":1148,"fm":1148,"tm":null,"am":1148,"md":0.0,"ls":"inside","ww":"Amontay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poctol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4174},{"i":5535,"cid":"22EH0061","pid":"P00621490LZ","t":"Construction of Ilaya-Ayog-og Flood Control Structure Phase II, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"EMQ DESIGN & CONSTRUCTION","c":24499249.85,"abc":24499999.5,"fy":"2022","sd":"04/12/2022","cd":"2022-10-10","lat":12.465,"lon":122.099444,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4175},{"i":5536,"cid":"24EH0103","pid":"P00823491LZ","t":"Construction of Ayog-og Flood Control Structure (Upstream) B/S, Bachawan, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"EMQ DESIGN & CONSTRUCTION","c":48249972.86,"abc":48249999.54,"fy":"2024","sd":"04/12/2024","cd":"2024-09-20","lat":12.465,"lon":122.1,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":600.32,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 600 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":261},{"i":5537,"cid":"23E00130","pid":"P00740419LZ","t":"Construction of Torrijos Seawall, Barangay Marlangga Section, Torrijos, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"TORRIJOS (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":241247022.1,"abc":241249999.8,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":13.3265,"lon":122.1005,"sm":1582,"fm":1582,"tm":1582,"am":1582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marlangga Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4176},{"i":5538,"cid":"22JA0041","pid":"P00631080MN","t":"Construction of Flood Control (Box Culvert) at Zone III A, Barangay Lumbangan, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"AYESHIA GENERAL TRADING CONSTRUCTION AND MAINTENANCE","c":4937068.47,"abc":4948347.03,"fy":"2022","sd":"03/24/2022","cd":"2023-02-02","lat":6.970053,"lon":122.103151,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumbangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4177},{"i":5539,"cid":"24EH0087","pid":"P00845835LZ","t":"Construction of Ilaya Buli River Control, Sitio Ilaya, Brgy. Buli, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":99000000.0,"abc":98999999.93,"fy":"2024","sd":"03/13/2024","cd":"2024-11-15","lat":12.4861,"lon":122.1044,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":"Ilaya Buli","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buli","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":601.53,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 602 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":438},{"i":5540,"cid":"22DM0133","pid":"P00639381LZ","t":"Construction of Flood Control Structure, Brgy. Amontay, Pitogo, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PITOGO (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":76235189.93,"abc":96499945.79,"fy":"2022","sd":"06/02/2022","cd":"2023-05-26","lat":13.833038,"lon":122.105066,"sm":1148,"fm":1148,"tm":1148,"am":1148,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Amontay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4178},{"i":5541,"cid":"22EH0153","pid":"P00639385LZ","t":"Construction of Bachawan (I - Laya) Bank Slope Protection along Tablas Circumferential Road, San Agustin, Romblon (Phase 2)","w":"Construction of Slope Protection Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN AGUSTIN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":93605000.0,"abc":93604999.5,"fy":"2022","sd":"07/18/2022","cd":"2023-06-17","lat":12.46358,"lon":122.10528,"sm":1252,"fm":1252,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4179},{"i":5542,"cid":"24EH0088","pid":"P00823581LZ","t":"Construction of Shore Protection/Causeway/Breakwater along Bachawan Feeder Port, San Agustin, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139924999.4,"fy":"2024","sd":"04/15/2024","cd":"2024-11-15","lat":12.463458,"lon":122.106405,"sm":1252,"fm":1251,"tm":1252,"am":1252,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":599.69,"text":"The record contradicts itself: the title and the pin point to San Agustin, Romblon, but the municipality field names San Agustin, Surigao del Sur, 600 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":439},{"i":5543,"cid":"22G00015","pid":"P00630195VS","t":"Construction of Flood Control Structure along Hamtic River, Brgy. Caridad - Brgy. Igbical, Hamtic, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"HAMTIC (ANTIQUE)","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":28945395.97,"abc":28950000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-11","lat":10.698719,"lon":121.981939,"sm":614,"fm":614,"tm":614,"am":614,"md":0.0,"ls":"inside","ww":"Hamtic","wn":"Hamtic River","wd":0.03,"wp":[10.69892,121.9818],"wst":"matched","br":"Caridad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4180},{"i":5544,"cid":"22BC0145","pid":"P00639461LZ","t":"Construction of Canayun - Sirit Flood Control along Abulug River, Abulug, Cagayan - Sta 12+076 - Sta 12+316","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"E.V. INTERIOR CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-09-30","lat":18.39498,"lon":121.42727,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.39437,121.42799],"wst":"matched","br":null,"len":240.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4181},{"i":5545,"cid":"24EA0073","pid":"P00821601LZ","t":"Construction of Flood Control Structure Along Bunganay River, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD","c":48995870.0,"abc":48998000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-20","lat":13.388021,"lon":121.828659,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Bunganay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4182},{"i":5546,"cid":"23EA0062","pid":"P00742452LZ","t":"Construction of Flood Control Structure, Brgy. Balagasan, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":9897013.25,"abc":9898000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-04","lat":13.412992,"lon":121.888335,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balagasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4183},{"i":5547,"cid":"24BH0207","pid":"P00843239LZ","t":"Construction of Barangay 2 Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION / VBM CONSTRUCTION CORP.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/17/2024","cd":"2024-12-07","lat":16.544986,"lon":121.697426,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"2 Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4184},{"i":5548,"cid":"22GA0116","pid":"P00632028VS","t":"Flood Control along Agbago-Aslum River, Ibajay, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"EC BUILDERS","c":14845000.06,"abc":14850000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-02-13","lat":11.80946,"lon":122.148698,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Agbago-Aslum","wn":"Agbago-Aslum River","wd":0.01,"wp":[11.80943,122.14862],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4185},{"i":5549,"cid":"23JA0015","pid":"P00721356MN","t":"Construction of Flood Control Structure at Maasin Creek, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"BENRAM CONSTRUCTION / ALLROCK CONSTRUCTION","c":39189522.49,"abc":39200000.0,"fy":"2023","sd":"04/21/2023","cd":"2023-10-23","lat":6.954923,"lon":121.983267,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Maasin","wn":"Maasin Creek","wd":0.01,"wp":[6.95491,121.98318],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4186},{"i":5550,"cid":"24BF0003","pid":"P00821565LZ","t":"Construction of Mallig River Flood Control Project, Barangay San Juan, Quirino, Isabela Sta Sta 0 + 000 - Sta 0 + 388","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":48996742.35,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-06-24","lat":17.134255,"lon":121.697644,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.01,"wp":[17.13428,121.69754],"wst":"matched","br":"San Juan","len":388.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4187},{"i":5551,"cid":"22CN0123","pid":"P00631167LZ","t":"Construction of Seawall, Brgy. Simbahan, Dinalungan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINALUNGAN (AURORA)","deo":"Aurora District Engineering Office","co":"ZF CONSTRUCTION","c":13966665.04,"abc":14700000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-10-30","lat":16.12673,"lon":121.888353,"sm":511,"fm":511,"tm":511,"am":511,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Simbahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4188},{"i":5552,"cid":"22BC0027","pid":"P00621037LZ","t":"Construction of Lucban Flood Control along Abulug River (Sta. 0+796 - Sta. 0+996), Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY / C.T. LEONCIO CONSTRUCTION & TRADING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2023-01-09","lat":18.3401,"lon":121.42792,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.34057,121.42707],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[5009,4989,5645],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22BC0023 to 22BC0027) cover the same site, together worth PHP 243,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":494},{"i":5553,"cid":"21CN0107","pid":"P00561684LZ","t":"Construction of Flood Control, Brgy. Dikapinisan, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"San Luis","deo":"Aurora District Engineering Office","co":"RADIANCE TRADERS & BUILDERS","c":14850000.0,"abc":14850000.0,"fy":"2021","sd":"01/11/2022","cd":"2022-12-12","lat":15.57837,"lon":121.53731,"sm":1320,"fm":null,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dikapinisan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4189},{"i":5554,"cid":"22GA0030","pid":"P00620271VS","t":"Construction of Revetment Wall along Ibajay River, Brgy. Laguinbanwa, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"SOLID MERCHANDISING / ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":86849994.7,"abc":86850000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-15","lat":11.806841,"lon":122.159738,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.04,"wp":[11.80682,122.16013],"wst":"matched","br":"Laguinbanwa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4190},{"i":5555,"cid":"23BG0044","pid":"P00726689LZ","t":"Construction of Cagayan River Flood Control Project, Barangay District 1, Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":43457710.95,"abc":43776312.05,"fy":"2023","sd":"03/08/2023","cd":"2023-06-08","lat":16.983297,"lon":121.828769,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.31,"wp":[16.98303,121.83166],"wst":"matched","br":"District 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4191},{"i":5556,"cid":"21EH0080","pid":"P00561577LZ","t":"Construction of Shore Protection/Causeway leading to Poctoy Port, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"Odiongan","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":49000000.0,"abc":48999999.5,"fy":"2021","sd":"08/06/2021","cd":"2022-10-03","lat":12.405278,"lon":121.983889,"sm":1034,"fm":null,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4192},{"i":5557,"cid":"22CN0117","pid":"P00631159LZ","t":"Construction of Flood Control Structure, Brgy. Zarah, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"RADIANCE TRADERS & BUILDERS","c":27929140.36,"abc":29400000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-02-01","lat":15.741751,"lon":121.53904,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zarah","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4193},{"i":5558,"cid":"23GA0039","pid":"P00721726VS","t":"Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":86849991.39,"abc":86850000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-11-20","lat":11.810409,"lon":122.161769,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.04,"wp":[11.81012,122.16201],"wst":"matched","br":"Polo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4194},{"i":5559,"cid":"24BC0077","pid":"P00825223LZ","t":"Construction of Lucban Flood Control along Abulug River, Abulug, Cagayan","w":"Construction of Flood Mitigation Facility","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL","c":24500000.0,"abc":24500000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-05-15","lat":18.340362,"lon":121.428016,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.34084,121.42723],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4195},{"i":5560,"cid":"21BG0151","pid":"P00561453LZ","t":"Construction of Flood Control Structure along Ganano River Bank, Barangay San Antonio, Alicia, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Alicia","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":96427479.98,"abc":96499993.86,"fy":"2021","sd":"11/23/2021","cd":"2022-09-15","lat":16.79998,"lon":121.697754,"sm":36,"fm":null,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":2.96,"wp":[16.77522,121.68736],"wst":"matched","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4196},{"i":5561,"cid":"22GA0022","pid":"P00620009VS","t":"Construction of Revetment Wall along Buruanga River, Poblacion, Buruanga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BURUANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":84299108.79,"abc":88200000.0,"fy":"2022","sd":"03/15/2022","cd":"2023-08-07","lat":11.855676,"lon":121.888545,"sm":264,"fm":264,"tm":264,"am":264,"md":0.0,"ls":"inside","ww":"Buruanga","wn":"Buruanga River","wd":0.9,"wp":[11.84768,121.89012],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4197},{"i":5562,"cid":"23BK0033","pid":"P00726145LZ","t":"Construction of San Pedro River Control Downstream (along Cagayan River) San Pedro, Maddela, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"MADDELA (QUIRINO)","deo":"Quirino District Engineering Office","co":"3K ROCK ENGINEERING","c":48531824.06,"abc":48534200.0,"fy":"2023","sd":"02/07/2023","cd":"2023-07-31","lat":16.354148,"lon":121.697935,"sm":857,"fm":857,"tm":857,"am":857,"md":0.0,"ls":"inside","ww":"San Pedro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4198},{"i":5563,"cid":"23GB0050","pid":"P00721727VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Bongsod, Sibalom, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":33762056.5,"abc":48250000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-12-09","lat":10.806591,"lon":121.984088,"sm":1443,"fm":1443,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.18,"wp":[10.80825,121.98431],"wst":"matched","br":"Bongsod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4199},{"i":5564,"cid":"24BG0089","pid":"P00821205LZ","t":"Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta. 0+000 - Sta. 0+470.40), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489605.42,"abc":96499995.75,"fy":"2024","sd":"06/24/2024","cd":"2024-09-27","lat":16.768591,"lon":121.698017,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.04,"wp":[16.76861,121.69768],"wst":"matched","br":"Apanay Downstream","len":470.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4200},{"i":5565,"cid":"22CN0104","pid":"P00631146LZ","t":"Construction of Drainage Canal, Phase II, Brgy. Reserva, Baler, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"CONRADO B. BAUTISTA CONST. & SUPPLY CORP. (FORMERL","c":27911584.27,"abc":29400000.0,"fy":"2022","sd":"06/21/2022","cd":"2023-08-22","lat":15.80507,"lon":121.54087,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Reserva","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4201},{"i":5566,"cid":"22DM0130","pid":"P00639379LZ","t":"Construction of Flood Control Structure with Bridge, General Luna, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL LUNA (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / ECOSENSE CONSTRUCTION","c":96500000.0,"abc":96499893.43,"fy":"2022","sd":"05/26/2022","cd":"2023-12-15","lat":13.6986,"lon":122.1649,"sm":573,"fm":573,"tm":573,"am":573,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4202},{"i":5567,"cid":"24DM0092","pid":"P00844775LZ","t":"Construction of Flood Control Structure at Brgy. Cabuyao, Padre Burgos, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PADRE BURGOS (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY / LAICAN ENTERPRISES INC.","c":49000000.0,"abc":48999851.0,"fy":"2024","sd":"04/11/2024","cd":"2024-09-19","lat":13.9055,"lon":121.89232,"sm":1050,"fm":1050,"tm":1050,"am":1050,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabuyao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4203},{"i":5568,"cid":"22BE0041","pid":"P00641868LZ","t":"Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+220) Phase II in Barangay Pilitan, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"ARVEA'S CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":47542133.85,"abc":48020000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-15","lat":17.2428,"lon":121.829,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[17.24218,121.83123],"wst":"matched","br":"Pilitan","len":220.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4204},{"i":5569,"cid":"23BC0073","pid":"P00727098LZ","t":"Construction of Canayun Flood Control along Abulug-Apayao River, Brgy. Canayun, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"FLAVIE CIVIL ENGINEERING CONSTRUCTION","c":29389157.37,"abc":29400000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-09-09","lat":18.396397,"lon":121.428032,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug-Apayao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Canayun","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4205},{"i":5570,"cid":"24BB0099","pid":"P00825221LZ","t":"Construction of Bank Protection along Wangag River (Upper Stream) Pateng Bridge along DSVR Pateng, Gonzaga, Cagayan, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GONZAGA (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":29379960.22,"abc":29400000.0,"fy":"2024","sd":"03/28/2024","cd":"2024-12-13","lat":18.249167,"lon":121.98639,"sm":592,"fm":592,"tm":592,"am":592,"md":0.0,"ls":"inside","ww":"Wangag","wn":"Wangag River","wd":0.29,"wp":[18.25115,121.98819],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4206},{"i":5571,"cid":"21BH0174","pid":"P00525564LZ","t":"Construction of Dubinan East Flood Control Structure, Dubinan East, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"City of Santiago","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":94570000.0,"abc":94570000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-08-27","lat":16.694214,"lon":121.540882,"sm":420,"fm":null,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4207},{"i":5572,"cid":"23BG0092","pid":"P00727354LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. District 1 (Sta. 0+000 - Sta. 0+550), Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":48659288.9,"abc":48679441.65,"fy":"2023","sd":"03/15/2023","cd":"2023-10-20","lat":16.983645,"lon":121.829351,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[16.98361,121.83169],"wst":"matched","br":"District 1","len":550.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4208},{"i":5573,"cid":"22BE0025","pid":"P00621048LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+229), Brgy. Camunatan, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":43898080.0,"abc":43948080.0,"fy":"2022","sd":"05/18/2022","cd":"2023-01-23","lat":17.13944,"lon":121.89263,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.51,"wp":[17.13948,121.89744],"wst":"matched","br":"Camunatan","len":229.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4209},{"i":5574,"cid":"24DM0135","pid":"P00823513LZ","t":"Construction of Flood Control Structure along Sabang River, Barangay San Jose, General Luna, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL LUNA (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"WAWAO BUILDERS","c":77200000.0,"abc":77199976.74,"fy":"2024","sd":"06/05/2024","cd":"2025-02-11","lat":13.69877,"lon":122.16495,"sm":573,"fm":573,"tm":573,"am":573,"md":0.0,"ls":"inside","ww":"Sabang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4210},{"i":5575,"cid":"22EI0112","pid":"P00640567LZ","t":"Construction of Flood Mitigation Structure Cagancan River, Brgy Don Pedro, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":24749532.4,"abc":24750000.0,"fy":"2022","sd":"07/20/2022","cd":"2023-03-13","lat":12.485278,"lon":121.428611,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Cagancan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Don Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4211},{"i":5576,"cid":"24BG0231","pid":"P00821568LZ","t":"Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 000 - Sta 0 + 188.30), Alicia, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":38566585.69,"abc":38576995.68,"fy":"2024","sd":"08/29/2024","cd":"2024-10-25","lat":16.769466,"lon":121.698104,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.03,"wp":[16.76959,121.69786],"wst":"matched","br":"Apanay","len":188.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4212},{"i":5577,"cid":"20G00098","pid":"P00420350VS","t":"Construction of Revetment at Sibalom Bridge (Abutment B Downstream), Pangpang, Sibalom, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"Sibalom","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":115798223.4,"abc":115800000.0,"fy":"2020","sd":"11/23/2020","cd":"2022-12-12","lat":10.808,"lon":121.988,"sm":1443,"fm":null,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4213},{"i":5578,"cid":"22CN0037","pid":"P00631163LZ","t":"Construction of Flood Mitigation Structures and Drainage System, Malupa-Dian-Aguang River Improvement Project, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"GERRA CONSTRUCTION INCORPORATED (FORMERLY: GERRA CONSTRUCTION) / JOHN DEE B. BUSTAMANTE CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-08-22","lat":15.769831,"lon":121.541615,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":"Malupa-Dian-Aguang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4214},{"i":5579,"cid":"22BE0057","pid":"P00621052LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+950), Brgy. Malalam, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48780682.5,"abc":48834576.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-21","lat":17.1478,"lon":121.8932,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.42,"wp":[17.14807,121.89713],"wst":"matched","br":"Malalam","len":950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4215},{"i":5580,"cid":"23BG0110","pid":"P00742119LZ","t":"Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 2), Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":98999519.74,"abc":98999997.13,"fy":"2023","sd":"04/25/2023","cd":"2024-05-08","lat":16.993469,"lon":121.829368,"sm":1203,"fm":1203,"tm":1203,"am":1203,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[16.99326,121.8308],"wst":"matched","br":"District 1","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4216},{"i":5581,"cid":"22BF0077","pid":"P00621158LZ","t":"Construction of Mallig River Flood Control Project (Luna Section), Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":96499222.24,"abc":96500000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-05-30","lat":17.137661,"lon":121.69925,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.03,"wp":[17.13751,121.69948],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5088,5067],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0075 to 22BF0077) cover the same site, together worth PHP 289,416,166.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":293},{"i":5582,"cid":"20G00098","pid":"P00420350VS","t":"Construction of Revetment at Sibalom Bridge (Abutment B Downstream), Pangpang, Sibalom, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"Sibalom","deo":"Antique District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":115798223.4,"abc":115800000.0,"fy":"2021","sd":"11/23/2020","cd":"2022-12-12","lat":10.808,"lon":121.988,"sm":1443,"fm":null,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4217},{"i":5583,"cid":"23EI0053","pid":"P00742465LZ","t":"Construction of Mansalay River Control at Brgy. Teresita, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":9897188.49,"abc":9900000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-05-22","lat":12.532222,"lon":121.428611,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Mansalay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Teresita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4218},{"i":5584,"cid":"23BE0051","pid":"P00726445LZ","t":"Construction of Flood Mitigation Structure along Ilagan River, Phase II, Brgy. Camunatan, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96180049.98,"abc":96200000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-18","lat":17.1373,"lon":121.8934,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.49,"wp":[17.13948,121.89744],"wst":"matched","br":"Camunatan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4219},{"i":5585,"cid":"22PJ0006","pid":"P00621479LZ","t":"Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 075, San Juan, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"MA CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-07","lat":16.89092,"lon":121.54214,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.08,"wp":[16.89104,121.54285],"wst":"matched","br":null,"len":512.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4220},{"i":5586,"cid":"22BE0042","pid":"P00620492LZ","t":"Construction of Flood Control System along Cagayan River (Sta 0+360 - Sta. 0+472), Phase II, Barangay Pilitan, Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":24255871.63,"abc":24500000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-25","lat":17.243988,"lon":121.82939,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.24,"wp":[17.24338,121.83159],"wst":"matched","br":"Pilitan","len":112.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4221},{"i":5587,"cid":"21GA0212","pid":"P00521767VS","t":"Construction of Revetment Wall along Ibajay River, Sitio Banloc, Barangay Naile, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"Ibajay","deo":"Aklan District Engineering Office","co":"FIRST MAKEEN CONSTRUCTION","c":19400000.0,"abc":19600000.0,"fy":"2021","sd":"10/08/2021","cd":"2022-11-02","lat":11.758118,"lon":122.165423,"sm":629,"fm":null,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.02,"wp":[11.75823,122.16524],"wst":"matched","br":"Naile","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4222},{"i":5588,"cid":"24BF0062","pid":"P00824885LZ","t":"Construction of Siffu River Flood Control Project (Cullalabo Section) Burgos, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BURGOS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RR BUILDERS / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96457919.01,"abc":96500000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-09-01","lat":17.11102,"lon":121.699358,"sm":262,"fm":262,"tm":null,"am":262,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.11119,121.69915],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4223},{"i":5589,"cid":"24BB0093","pid":"P00824682LZ","t":"Construction of Bank Protection along Wangag River (Upper Stream) Pateng Bridge along DSVR Pateng, Gonzaga, Cagayan, Phase I","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GONZAGA (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":29394988.25,"abc":29400000.0,"fy":"2024","sd":"04/07/2024","cd":"2024-08-18","lat":18.25556,"lon":121.98806,"sm":592,"fm":592,"tm":592,"am":592,"md":0.0,"ls":"inside","ww":"Wangag","wn":"Wangag River","wd":0.02,"wp":[18.25555,121.98789],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4224},{"i":5590,"cid":"22BC0032","pid":"P00621042LZ","t":"Construction of Sto. Tomas Flood Control along Abulug River (Sta. 15+162 - Sta. 15+412 L/S), Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-11-30","lat":18.44121,"lon":121.42873,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.45,"wp":[18.44028,121.43283],"wst":"matched","br":null,"len":250.0,"ph":null,"dup":[5599],"run":[4909,5691],"cl":[],"L":"field","s":50,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 101,592,402.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BC0030 to 22BC0032) cover the same site, together worth PHP 146,128,215.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":107},{"i":5591,"cid":"24CN0018","pid":"P00823437LZ","t":"Construction of Calabuanan-Buhangin Flood Control, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-22","lat":15.772622,"lon":121.54225,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4225},{"i":5592,"cid":"24DK0146","pid":"P00846081LZ","t":"Construction of Flood Control Structure at Brgy. Patnanungan Norte, Patnanungan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PATNANUNGAN (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"N.T. SOTELO CONSTRUCTION AND SUPPLY CORPORATION","c":4943557.73,"abc":4950000.0,"fy":"2024","sd":"07/31/2024","cd":"2024-10-01","lat":14.780932,"lon":122.166763,"sm":1114,"fm":1114,"tm":1114,"am":1114,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patnanungan Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4226},{"i":5593,"cid":"23BG0107","pid":"P00742118LZ","t":"Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 1), Reina Mercedes, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"REINA MERCEDES (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":98997072.72,"abc":98999997.93,"fy":"2023","sd":"04/25/2023","cd":"2024-05-08","lat":16.998128,"lon":121.830026,"sm":1203,"fm":1203,"tm":1203,"am":1008,"md":0.42,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.17,"wp":[16.99785,121.83155],"wst":"matched","br":"District 1","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4227},{"i":5594,"cid":"23E00197","pid":"P00726951LZ","t":"Construction of Mayha - Rizal Flood Control Structure, Tablas Island Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ALCANTARA (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":192991021.8,"abc":193000000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-12-10","lat":12.3765,"lon":121.99,"sm":27,"fm":27,"tm":null,"am":1034,"md":6.09,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":68,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":6.09,"text":"The pin is 6.1 km outside Alcantara, Romblon, the nearest municipality the record claims. It falls in Odiongan, Romblon.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":55},{"i":5595,"cid":"23DJ0022","pid":"P00727168LZ","t":"Construction of Balubal River Flood Control, Sariaya, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"I.A . BOSQUE CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/14/2023","cd":"2024-02-28","lat":13.94788,"lon":121.54272,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Balubal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4228},{"i":5596,"cid":"24GA0014","pid":"P00820026VS","t":"Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"ALMANA CONSTRUCTION AND DEV'T CORPORATION","c":128763569.0,"abc":130315530.0,"fy":"2024","sd":"03/07/2024","cd":"2024-09-16","lat":11.814397,"lon":122.167225,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.03,"wp":[11.81429,122.16748],"wst":"matched","br":"Polo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4229},{"i":5597,"cid":"22EA0242","pid":"P00639517LZ","t":"Construction of Seawall, Brgy. Guisian, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"K CONSTRUCTION & DEVELOPERS CORPORATION","c":9788709.37,"abc":9798000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-09-05","lat":13.5414,"lon":121.8941,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guisian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4230},{"i":5598,"cid":"23BG0014","pid":"P00726698LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Palattao, Naguilian, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":44080822.0,"abc":44099985.06,"fy":"2023","sd":"03/14/2023","cd":"2023-09-27","lat":17.007172,"lon":121.832351,"sm":1008,"fm":1008,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[17.00688,121.83371],"wst":"matched","br":"Palattao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4231},{"i":5599,"cid":"22BC0146","pid":"P00639462LZ","t":"Construction of Sto Tomas Flood Control along Abulug River, Sto Tomas, Abulug, Cagayan - K14+662 - K14+912","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":52592402.45,"abc":53075000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-08-04","lat":18.44121,"lon":121.42873,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.45,"wp":[18.44028,121.43283],"wst":"matched","br":null,"len":null,"ph":null,"dup":[5590],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 101,592,402.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":889},{"i":5600,"cid":"22BK0086","pid":"P00621074LZ","t":"Construction of San Pedro River Control (along Cagayan River), San Pedro, Maddela, Upstream, Quirino","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"QUIRINO","mu":"MADDELA (QUIRINO)","deo":"Quirino District Engineering Office","co":"A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION)","c":48997887.83,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-11-09","lat":16.34864,"lon":121.699378,"sm":857,"fm":857,"tm":857,"am":857,"md":0.0,"ls":"inside","ww":"San Pedro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4232},{"i":5601,"cid":"22E00057","pid":"P00630956LZ","t":"Construction of Pili Flood Control Structure (Phase 2), Looc, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"LOOC (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":115776410.0,"abc":115799875.6,"fy":"2022","sd":"02/23/2022","cd":"2022-12-01","lat":12.2598,"lon":121.990157,"sm":806,"fm":806,"tm":806,"am":806,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4233},{"i":5602,"cid":"24PJ0018","pid":"P00823322LZ","t":"Construction of San Juan Flood Control, Sta. 41+437 - Sta. 42+137, San Juan, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION","c":78358000.0,"abc":78342073.18,"fy":"2024","sd":"02/23/2024","cd":"2024-09-25","lat":16.877377,"lon":121.542928,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4234},{"i":5603,"cid":"24GA0016","pid":"P00820028VS","t":"Construction of Revetment Wall along Ibajay River, Ibajay, Aklan (Package 3)","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":121348746.1,"abc":121348750.0,"fy":"2024","sd":"02/06/2024","cd":"2024-08-19","lat":11.818436,"lon":122.168288,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.04,"wp":[11.81838,122.1679],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4235},{"i":5604,"cid":"24BE0122","pid":"P00844740LZ","t":"Construction of Flood Mitigation Structure along Pinacanauan River, Barangay Baculod, Ilagan City, Isabela.","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48994560.0,"abc":49000000.0,"fy":"2024","sd":"06/24/2024","cd":"2024-09-15","lat":17.1503,"lon":121.89674,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":"Pinacanauan River","wd":32.39,"wp":[17.42715,121.79768],"wst":"matched","br":"Baculod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4236},{"i":5605,"cid":"24GA0015","pid":"P00820027VS","t":"Construction of Revetment Wall along Ibajay River, Brgy. Rizal, Ibajay, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"IBAJAY (AKLAN)","deo":"Aklan District Engineering Office","co":"ALMANA CONSTRUCTION AND DEV'T CORPORATION","c":95335880.55,"abc":96500000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-09-16","lat":11.782728,"lon":122.170576,"sm":629,"fm":629,"tm":629,"am":629,"md":0.0,"ls":"inside","ww":"Ibajay","wn":"Ibajay River","wd":0.02,"wp":[11.78292,122.17051],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4237},{"i":5606,"cid":"22BG0005","pid":"P00631123LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Minanga, Naguilian, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":44084315.86,"abc":43831597.17,"fy":"2022","sd":"02/14/2022","cd":"2023-03-16","lat":16.973639,"lon":121.832375,"sm":1008,"fm":1008,"tm":1008,"am":1203,"md":0.05,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.03,"wp":[16.97365,121.83268],"wst":"matched","br":"Minanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.38,"value":1.00577,"text":"Contract cost is 0.58% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":890},{"i":5607,"cid":"24EH0063","pid":"P00825133LZ","t":"Construction of Flood Control Structure, Mayha River Upstream (L/S), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96500000.0,"abc":96499999.47,"fy":"2024","sd":"03/13/2024","cd":"2024-12-13","lat":12.3714,"lon":121.9903,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":"Mayha","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[5618],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 236,425,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":688},{"i":5608,"cid":"23BH0173","pid":"P00740317LZ","t":"Construction of Flood Control Structure, Barangay II, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96499900.26,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-07","lat":16.545735,"lon":121.701176,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"II","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4238},{"i":5609,"cid":"23CN0112","pid":"P00740578LZ","t":"Construction of Drainage Structure, Brgy. Reserva, Baler, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"CONRADO B. BAUTISTA CONST. & SUPPLY CORP. (FORMERL","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"04/13/2023","cd":"2024-05-16","lat":15.79691,"lon":121.54331,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Reserva","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4239},{"i":5610,"cid":"22PL0055","pid":"P00621496LZ","t":"Construction of Mega Dike Project along Chico River (Right Bank), Tabuk City, Kalinga","w":"Construction of Dike","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION","c":57568444.07,"abc":57857801.11,"fy":"2022","sd":"04/08/2022","cd":"2023-03-29","lat":17.423317,"lon":121.429047,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.19,"wp":[17.42338,121.42726],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4240},{"i":5611,"cid":"22BE0046","pid":"P00621046LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+208), Brgy. Bangag-Manaring, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":44050000.0,"abc":44100000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-02-19","lat":17.1662,"lon":121.8972,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.07,"wp":[17.16559,121.89703],"wst":"matched","br":"Bangag-Manaring","len":208.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4241},{"i":5612,"cid":"21PL0009","pid":"P00526265LZ","t":"Construction of A. Canao Bridge Towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 92+700 - Sta. 93+500 (Right Bank), Tabuk City, Kalinga.","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"City of Tabuk","deo":"Lower Kalinga District Engineering Office","co":"OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION","c":76424709.06,"abc":77197516.75,"fy":"2021","sd":"04/08/2022","cd":"2023-02-28","lat":17.417581,"lon":121.429425,"sm":424,"fm":null,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.17,"wp":[17.41769,121.42784],"wst":"matched","br":null,"len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4242},{"i":5613,"cid":"22DM0117","pid":"P00621470LZ","t":"Construction of Drainage System along Poblacion Wide to Brgy. San Jose, Gen. Luna, Quezon","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GENERAL LUNA (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"WYDERWAYS BUILDERS AND SUPPLIES","c":29400000.0,"abc":29399907.64,"fy":"2022","sd":"04/05/2022","cd":"2023-04-22","lat":13.692271,"lon":122.173568,"sm":573,"fm":573,"tm":573,"am":573,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4243},{"i":5614,"cid":"23BG0075","pid":"P00726427LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Minanga, Naguilian, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":52833696.23,"abc":52722400.25,"fy":"2023","sd":"03/15/2023","cd":"2023-11-04","lat":16.969839,"lon":121.833287,"sm":1008,"fm":1008,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[16.97044,121.83238],"wst":"matched","br":"Minanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4244},{"i":5615,"cid":"23EA0031","pid":"P00726950LZ","t":"Construction of Mainit Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 600, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS)","c":77167301.33,"abc":77198000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-12-04","lat":13.420376,"lon":121.897572,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4245},{"i":5616,"cid":"24CN0097","pid":"P00844534LZ","t":"Construction of Box Culvert, Brgy. Lobbot, Dipaculao, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO","c":4798860.49,"abc":4900000.0,"fy":"2024","sd":"07/05/2024","cd":"2024-12-16","lat":15.86236,"lon":121.54424,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lobbot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4246},{"i":5617,"cid":"23EI0033","pid":"P00727200LZ","t":"Construction of Baroc River Control, Barangay Roma, Sitio Angaran Section, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48997147.81,"abc":48999968.93,"fy":"2023","sd":"03/15/2023","cd":"2024-01-18","lat":12.582222,"lon":121.429722,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Roma","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4247},{"i":5618,"cid":"24EH0074","pid":"P00825134LZ","t":"Construction of Flood Control Structure along Mayha River (Phase 2), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139924999.4,"fy":"2024","sd":"03/13/2024","cd":"2024-12-13","lat":12.3714,"lon":121.9903,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":"Mayha","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[5607],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 236,425,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":689},{"i":5619,"cid":"22CN0112","pid":"P00631154LZ","t":"Construction of Flood Control Structure, Brgy. Lobbot, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M.  CONSTRUCTION)","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-12-15","lat":15.859562,"lon":121.545746,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lobbot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4248},{"i":5620,"cid":"21BG0152","pid":"P00561454LZ","t":"Construction of Flood Control Structure along Ganano River Bank, Barangay Sta Cruz, Alicia, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Alicia","deo":"Isabela 3rd District Engineering Office","co":"C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":96490653.68,"abc":96499986.74,"fy":"2021","sd":"11/23/2021","cd":"2022-09-02","lat":16.768337,"lon":121.701367,"sm":36,"fm":null,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.07,"wp":[16.76843,121.70071],"wst":"matched","br":"Sta Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4249},{"i":5621,"cid":"22CN0118","pid":"P00631160LZ","t":"Construction of Flood Control Structure, Sitio Dipasaleng Creek, Brgy. Diniog, Dilasag, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DILASAG (AURORA)","deo":"Aurora District Engineering Office","co":"BAMM BUSINESS VENTURES INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-09-14","lat":16.30561,"lon":122.17807,"sm":506,"fm":506,"tm":506,"am":506,"md":0.0,"ls":"inside","ww":"Sitio Dipasaleng","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Diniog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4250},{"i":5622,"cid":"24BG0070","pid":"P00821164LZ","t":"Construction of Cagayan River Flood Control Project at Barangay Minanga, Naguilian, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96489408.59,"abc":96499996.77,"fy":"2024","sd":"04/03/2024","cd":"2024-08-05","lat":16.974478,"lon":121.833678,"sm":1008,"fm":1008,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.11,"wp":[16.97443,121.83264],"wst":"matched","br":"Minanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4251},{"i":5623,"cid":"23EA0014","pid":"P00737547LZ","t":"Construction of Flood Control Structure, Barangay Banuyo, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":5938368.63,"abc":5937999.99,"fy":"2023","sd":"01/31/2023","cd":"2023-06-24","lat":13.278469,"lon":121.899096,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banuyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4252},{"i":5624,"cid":"22BG0001","pid":"P00631128LZ","t":"Construction of Flood Control Structure along the bank of Ganano River, Sta. Cruz, Alicia, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ALICIA (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":41495256.89,"abc":42139998.88,"fy":"2022","sd":"05/31/2022","cd":"2023-02-16","lat":16.765819,"lon":121.702208,"sm":36,"fm":36,"tm":36,"am":36,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.04,"wp":[16.76566,121.70184],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4253},{"i":5625,"cid":"22BB0131","pid":"P00640507LZ","t":"Rehabilitation of Seawall at the Crab Hotel, Centro, Buguey, Cagayan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"CAGAYAN","mu":"BUGUEY (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"RPF CONSTRUCTION","c":19019000.0,"abc":24750000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-02-06","lat":18.290278,"lon":121.833889,"sm":244,"fm":244,"tm":244,"am":244,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4254},{"i":5626,"cid":"24DL0112","pid":"P00820922LZ","t":"Construction of Seawall in Barangay Poblacion 5, Quezon, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"QUEZON (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":4826779.06,"abc":4900000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-04-15","lat":14.003853,"lon":122.180053,"sm":1188,"fm":1188,"tm":1188,"am":1188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4255},{"i":5627,"cid":"23C00100","pid":"P00727282LZ","t":"Construction of Abitonan Flood Control Structure, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. / 4VC BUILDERS & DEVELOPMENT CORP.","c":192999941.8,"abc":192999972.3,"fy":"2023","sd":"06/26/2023","cd":"2024-03-31","lat":15.861554,"lon":121.546329,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4256},{"i":5628,"cid":"22BC0082","pid":"P00631107LZ","t":"Construction of Lucban Flood Control Structure along Abulug River, Lucban, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY / C.T. LEONCIO CONSTRUCTION & TRADING","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"02/14/2022","cd":"2023-02-10","lat":18.3425,"lon":121.43,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.12,"wp":[18.34325,121.42922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":503},{"i":5629,"cid":"24DL0017","pid":"P00820915LZ","t":"Construction of Flood Control along Caglate River, Alabat, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ALABAT (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":4837404.35,"abc":4900000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-08-08","lat":14.121888,"lon":121.990761,"sm":17,"fm":17,"tm":17,"am":17,"md":0.0,"ls":"inside","ww":"Caglate","wn":"Caglate River","wd":0.0,"wp":[14.12193,121.99074],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4257},{"i":5630,"cid":"23P00004","pid":"P00726412LZ","t":"Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"JTM CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":144750000.0,"abc":144745196.1,"fy":"2023","sd":"04/12/2023","cd":"2024-06-21","lat":17.44389,"lon":121.43222,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.02,"wp":[17.44376,121.43231],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4258},{"i":5631,"cid":"22EA0238","pid":"P00639513LZ","t":"Construction of Flood Control Structure, Brgy. Bantay, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"ZUIDEN BUILDERS INC.","c":19568537.1,"abc":19598000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-10-30","lat":13.4218,"lon":121.8992,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bantay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4259},{"i":5632,"cid":"24DD0153","pid":"P00820875LZ","t":"Construction of Pinagbayanan CIS Water Management Flood Control Project of Lawayi River, San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"MEGAJES CONSTRUCTION CORP.","c":9506486.0,"abc":9800000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-07-03","lat":13.810134,"lon":121.43224,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawayi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4260},{"i":5633,"cid":"22DL0112","pid":"P00640562LZ","t":"Construction of Shoreline/Seawall in Barangay V, Quezon, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"QUEZON (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-16","lat":14.004394,"lon":122.180876,"sm":1188,"fm":1188,"tm":1188,"am":1188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"V","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4261},{"i":5634,"cid":"22BB0024","pid":"P00621033LZ","t":"Construction of Seawall Centro Norte, Buguey, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BUGUEY (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"AGAFER CONSTRUCTION AND TRADING CORPORATION (FOR: AGAFER CONSTRUCTION AND TRADING)","c":47530000.0,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-02-06","lat":18.290313,"lon":121.833902,"sm":244,"fm":244,"tm":244,"am":244,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4262},{"i":5635,"cid":"22CN0101","pid":"P00631143LZ","t":"Construction of Box Culvert, Brgy. Mijares, Dipaculao, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DIPACULAO (AURORA)","deo":"Aurora District Engineering Office","co":"ULIRAN CONSTRUCTION SERVICES","c":4900000.0,"abc":4900000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-10","lat":15.874902,"lon":121.547975,"sm":518,"fm":518,"tm":518,"am":518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mijares","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4263},{"i":5636,"cid":"22EH0015","pid":"P00620264LZ","t":"Construction of Batiano Boulevard Flood Mitigating Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":96485036.56,"abc":96499999.5,"fy":"2022","sd":"03/29/2022","cd":"2023-06-26","lat":12.4228,"lon":121.9908,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4264},{"i":5637,"cid":"24PM0017","pid":"P00821546LZ","t":"Construction of Buringal Proper Flood Control, Sta. 065+550 - Sta. 065+950 (R.S.), Buringal, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-18","lat":17.19938,"lon":121.55196,"sm":1102,"fm":1102,"tm":1102,"am":902,"md":0.26,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4265},{"i":5638,"cid":"22BH0112","pid":"P00621449LZ","t":"Construction of Sta. Cruz Flood Control Project at Barangay Sta. Cruz, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-11-10","lat":16.693635,"lon":121.705494,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4266},{"i":5639,"cid":"24BG0061","pid":"P00821167LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Magsaysay, Naguilian, Isabela, Phase II","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":96449595.32,"abc":96499998.74,"fy":"2024","sd":"03/12/2024","cd":"2024-06-25","lat":17.013661,"lon":121.834625,"sm":1008,"fm":1327,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.01,"wp":[17.01365,121.83475],"wst":"matched","br":"Magsaysay","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.17,"text":"The record contradicts itself: the title and the pin point to Naguilian, Isabela, but the municipality field names San Mariano, Isabela, 15 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":459},{"i":5640,"cid":"22DL0147","pid":"P00621498LZ","t":"Construction of Shoreline/Seawall in Poblacion 6, Quezon, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"QUEZON (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":24010000.0,"abc":24010000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-09-12","lat":14.005945,"lon":122.187362,"sm":1188,"fm":1188,"tm":1188,"am":1188,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4267},{"i":5641,"cid":"24GB0053","pid":"P00834988VS","t":"Construction of River Wall, Brgy. Calacja I, Municipality of Hamtic, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"HAMTIC (ANTIQUE)","deo":"Antique District Engineering Office","co":"HMM BUILDERS AND CONSTRUCTION SUPPLY","c":4928055.67,"abc":4950000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-05-09","lat":10.6359,"lon":121.9959,"sm":614,"fm":614,"tm":614,"am":614,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calacja I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4268},{"i":5642,"cid":"22BH0110","pid":"P00639327LZ","t":"Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96499615.93,"abc":96500000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-01-10","lat":16.674654,"lon":121.55254,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calaocan Section 1","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4269},{"i":5643,"cid":"23BG0071","pid":"P00727266LZ","t":"Construction of Flood Control Project along Cagayan River, Alangigan, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":95855332.27,"abc":95858914.67,"fy":"2023","sd":"03/15/2023","cd":"2023-08-18","lat":16.747636,"lon":121.706969,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.09,"wp":[16.74693,121.70746],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4270},{"i":5644,"cid":"24EA0027","pid":"P00820965LZ","t":"Construction of Santol Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":18214714.08,"abc":19598000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-04-24","lat":13.450475,"lon":121.834774,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4271},{"i":5645,"cid":"22BC0025","pid":"P00621035LZ","t":"Construction of Dugo Flood Control along Abulug River (Sta. 10+310 - Sta. 10+600 R/S), Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"AGAFER CONSTRUCTION AND TRADING CORPORATION (FOR: AGAFER CONSTRUCTION AND TRADING)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-03-09","lat":18.41202,"lon":121.43235,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.11,"wp":[18.4127,121.43315],"wst":"matched","br":null,"len":290.0,"ph":null,"dup":[],"run":[5009,4989,5552],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22BC0023 to 22BC0027) cover the same site, together worth PHP 243,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":495},{"i":5646,"cid":"22CN0121","pid":"P00631165LZ","t":"Construction of Seawall, Brgy. Diagyan, Dilasag, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DILASAG (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-07-14","lat":16.43628,"lon":122.20058,"sm":506,"fm":506,"tm":506,"am":506,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Diagyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4272},{"i":5647,"cid":"23GF0080","pid":"P00731617VS","t":"Construction of San Jose Flood Control Structure, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96353234.03,"abc":96500000.0,"fy":"2023","sd":"03/23/2023","cd":"2024-11-19","lat":10.706111,"lon":122.202222,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4273},{"i":5648,"cid":"24GF0031","pid":"P00821051VS","t":"Construction of Cagbang Flood Control Structure, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"CONTE BUILDERS & CONSTRUCTION SUPPLY","c":14677241.97,"abc":14700000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-09-26","lat":10.6877,"lon":122.20276,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4274},{"i":5649,"cid":"22EA0071","pid":"P00620900LZ","t":"Construction of Flood Control Structure along Boac River, Sta. 0+000 - Sta. 0+950, Brgy. Mainit, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":86848881.33,"abc":86848000.0,"fy":"2022","sd":"02/23/2022","cd":"2023-04-26","lat":13.4125,"lon":121.8995,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.08,"wp":[13.41245,121.90028],"wst":"matched","br":"Mainit","len":950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4275},{"i":5650,"cid":"24BG0008","pid":"P00821166LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Magsaysay, Naguilian, Isabela, Phase I","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":96393939.68,"abc":96499996.12,"fy":"2024","sd":"03/12/2024","cd":"2024-06-10","lat":17.018011,"lon":121.835431,"sm":1008,"fm":1008,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.04,"wp":[17.01802,121.83508],"wst":"matched","br":"Magsaysay","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4276},{"i":5651,"cid":"22BH0111","pid":"P00639328LZ","t":"Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96499653.77,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-03-15","lat":16.675404,"lon":121.553741,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calaocan Section 2","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4277},{"i":5652,"cid":"24GF0057","pid":"P00821050VS","t":"Construction of Bacauan - Palaca River Control including Access Road , Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"J'14 CONSTRUCTION & SUPPLY","c":4856848.48,"abc":4900000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-01-15","lat":10.63917,"lon":122.21361,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":"Palaca","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4278},{"i":5653,"cid":"22EA0239","pid":"P00639514LZ","t":"Construction of Flood Control Structure, Brgy. Ogbac, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"G.T.J. CONSTRUCTION","c":30378967.2,"abc":30378000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-03-26","lat":13.4148,"lon":121.9009,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ogbac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4279},{"i":5654,"cid":"24EH0102","pid":"P00844549LZ","t":"Construction of Torre-Looban Flood Control Structure, Odionan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ATHENA CONSTRUCTION AND DEVELOPMENT","c":19300000.0,"abc":19299999.53,"fy":"2024","sd":"04/08/2024","cd":"2024-10-14","lat":12.4228,"lon":121.9972,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4280},{"i":5655,"cid":"22EI0023","pid":"P00621122LZ","t":"Construction of Bongabong River Control, Brgy. San Jose Section, Sta. 0+000 - Sta. 0+792, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":48999954.43,"abc":48999036.16,"fy":"2022","sd":"04/13/2022","cd":"2023-01-07","lat":12.666389,"lon":121.433056,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.15,"wp":[12.66773,121.43278],"wst":"matched","br":"San Jose Section","len":792.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4281},{"i":5656,"cid":"22BF0046","pid":"P00637770LZ","t":"Construction of Siffu River Flood Control Project (QuiBur Bridge Downstream Section Phase II), Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":20789987.48,"abc":20790000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-11-06","lat":17.11638,"lon":121.70849,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.04,"wp":[17.11659,121.70884],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4282},{"i":5657,"cid":"22BE0055","pid":"P00631115LZ","t":"Construction of River Control at Oway River below the Dicaruyan-Sapinit Bridge, Barangay Dicaruyan, Divilacan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DIVILACAN (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":4890000.0,"abc":4900000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-07-22","lat":17.334412,"lon":122.228321,"sm":522,"fm":522,"tm":522,"am":522,"md":0.0,"ls":"inside","ww":"Oway","wn":"Oway River","wd":0.02,"wp":[17.33427,122.22839],"wst":"matched","br":"Dicaruyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4283},{"i":5658,"cid":"24PM0032","pid":"P00823330LZ","t":"Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-10-27","lat":17.20109,"lon":121.55389,"sm":1102,"fm":1102,"tm":1102,"am":902,"md":0.38,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":900.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4284},{"i":5659,"cid":"23EH0017","pid":"P00726279LZ","t":"Construction of Batiano Flood Control Structure along Tablas Circumferential Road (Downstream), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"R.G. FLORENTINO CONST. & TRADING INC.","c":48994906.26,"abc":48999999.61,"fy":"2023","sd":"02/22/2023","cd":"2023-08-16","lat":12.4228,"lon":121.9975,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4285},{"i":5660,"cid":"22BD0080","pid":"P00621243LZ","t":"Construction of Drainage System, Gunnacao St., Tuguegarao City, Cagayan, Phase III","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"DOUBLE J1908 CONSTRUCTION","c":9650000.0,"abc":9650000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-29","lat":17.603656,"lon":121.708667,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4286},{"i":5661,"cid":"23DD0226","pid":"P00727312LZ","t":"Construction of Revetment along Lawaya River (Pinagbayaran Section), San Juan, Batangas","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-09-02","lat":13.81123,"lon":121.43329,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4287},{"i":5662,"cid":"22BE0013","pid":"P00621049LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+213), Brgy. Capo, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":44072939.6,"abc":44100000.0,"fy":"2022","sd":"05/18/2022","cd":"2022-10-13","lat":17.1645,"lon":121.9017,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.09,"wp":[17.16392,121.90108],"wst":"matched","br":"Capo","len":213.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4288},{"i":5663,"cid":"24GF0029","pid":"P00832626VS","t":"Construction of Tangyan River Control and Revetment Structure, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"SKF BUILDERS AND SUPPLIES CORP.","c":19280582.34,"abc":19800000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-09-05","lat":10.69168,"lon":122.229121,"sm":599,"fm":599,"tm":599,"am":971,"md":5.16,"ls":"outside","ww":"Tangyan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.16,"text":"The pin is 5.2 km outside Guimbal, Iloilo, the nearest municipality the record claims. It falls in Miagao, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":335},{"i":5664,"cid":"23BB0111","pid":"P00742294LZ","t":"Construction of a Seawall, Buguey, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BUGUEY (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"RPF CONSTRUCTION","c":4940000.0,"abc":4950000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-06-09","lat":18.289444,"lon":121.836389,"sm":244,"fm":244,"tm":244,"am":244,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4289},{"i":5665,"cid":"23DK0076","pid":"P00737526LZ","t":"Rehabilitation of Flood Control Structure, Barangay Poblacion, Lucban, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCBAN (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORAT","c":4949935.98,"abc":4950000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-10-19","lat":14.114312,"lon":121.5548,"sm":818,"fm":818,"tm":818,"am":818,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4290},{"i":5666,"cid":"24EH0104","pid":"P00823588LZ","t":"Construction of Batiano Flood Control Phase 2 (Downstream), Batiano, Odioangan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SCATR CONSTRUCTION","c":96497999.88,"abc":96499999.8,"fy":"2024","sd":"03/19/2024","cd":"2024-11-25","lat":12.4222,"lon":121.9986,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4291},{"i":5667,"cid":"22BF0004","pid":"P00621057LZ","t":"Construction of Siffu River Flood Control Project (Qui-Bur Bridge Abutment \"B\" Downstream Section), Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":39199987.54,"abc":39200000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-18","lat":17.117008,"lon":121.70895,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.03,"wp":[17.11684,121.70867],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4292},{"i":5668,"cid":"23DP0061","pid":"P00726934LZ","t":"Construction of Slope Protection for Liliw Bridge, Liliw, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LILIW (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":86840064.43,"abc":86850000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-02-04","lat":14.130047,"lon":121.433955,"sm":789,"fm":789,"tm":789,"am":789,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4293},{"i":5669,"cid":"23DJ0101","pid":"P00740383LZ","t":"Construction of Morong River Flood Control (Package 12), Sariaya, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SARIAYA (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/02/2023","cd":"2024-04-26","lat":13.94768,"lon":121.55497,"sm":1428,"fm":1428,"tm":1428,"am":1428,"md":0.0,"ls":"inside","ww":"Morong","wn":"Morong River","wd":0.72,"wp":[13.9451,121.54881],"wst":"matched","br":null,"len":null,"ph":"Package 12","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4294},{"i":5670,"cid":"23EA0021","pid":"P00726258LZ","t":"Construction of Puyog Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 700, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"APRIL ROSE ENT. & BUILDERS","c":37243853.46,"abc":47037999.99,"fy":"2023","sd":"01/31/2023","cd":"2023-08-09","lat":13.437274,"lon":121.903642,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4295},{"i":5671,"cid":"23EH0020","pid":"P00726275LZ","t":"Construction of Flood Mitigating Structure along Gabawan Bridge (Upstream R/S), Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48997559.85,"abc":48999999.7,"fy":"2023","sd":"02/21/2023","cd":"2023-12-04","lat":12.42222,"lon":121.99861,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4296},{"i":5672,"cid":"23DD0066","pid":"P00726542LZ","t":"Construction of Revetment along Malaking Ilog River, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-20","lat":13.82876,"lon":121.43507,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Malaking Ilog","wn":"Malaking Ilog","wd":35.84,"wp":[13.8567,121.10482],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4297},{"i":5673,"cid":"24BF0005","pid":"P00820170LZ","t":"Construction of Siffu River Flood Control Project (Barangay Antonino), Sta. 0+000 - Sta. 0+800, Burgos, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"BURGOS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":89344393.48,"abc":89384090.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-02","lat":17.10576,"lon":121.70945,"sm":262,"fm":262,"tm":262,"am":262,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.13,"wp":[17.10644,121.71046],"wst":"matched","br":"Antonino","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4298},{"i":5674,"cid":"24C00002","pid":"P00821221LZ","t":"Construction of Aguang Flood Control Structure, Baler, Aurora (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. / 4VC BUILDERS & DEVELOPMENT CORP.","c":146679617.4,"abc":146679656.5,"fy":"2024","sd":"05/06/2024","cd":"2024-12-31","lat":15.78205,"lon":121.55559,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4299},{"i":5675,"cid":"23BB0112","pid":"P00742293LZ","t":"Construction of Seawall, Brgy. Santa Maria, Buguey, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BUGUEY (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"REYROSE CONSTRUCTION","c":19754081.38,"abc":19800000.0,"fy":"2023","sd":"04/04/2023","cd":"2024-07-29","lat":18.289444,"lon":121.836944,"sm":244,"fm":244,"tm":244,"am":244,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Maria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4300},{"i":5676,"cid":"21JA0017","pid":"P00522141MN","t":"Construction of Shoreline Protection, Limpapa Section, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"JAMARI CONSTRUCTION (FORMERLY FRAE CONSTRUCTION)","c":39544872.43,"abc":46060000.0,"fy":"2021","sd":"06/15/2021","cd":"2022-08-25","lat":7.133193,"lon":121.903992,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4301},{"i":5677,"cid":"23GF0085","pid":"P00733298VS","t":"Construction of Tumagbok Flood Control Structure including Access Road, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":48489591.89,"abc":49000000.0,"fy":"2023","sd":"03/31/2023","cd":"2024-03-01","lat":10.649722,"lon":122.236111,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4302},{"i":5678,"cid":"23E00009","pid":"P00736049LZ","t":"Construction of Buenavista Shore Protection/Boulevard, Barangay Tungib-Lipata, Buenavista, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":192997859.2,"abc":192999999.1,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":13.2033,"lon":121.9997,"sm":241,"fm":241,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tungib-Lipata","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4303},{"i":5679,"cid":"22PJ0044","pid":"P00620482LZ","t":"Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.6, Posnaan, Aguinaldo, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"AGUINALDO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":20914465.8,"abc":76237286.54,"fy":"2022","sd":"05/23/2022","cd":"2023-03-05","lat":16.92942,"lon":121.43543,"sm":12,"fm":12,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":358.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4304},{"i":5680,"cid":"23EI0009","pid":"P00736623LZ","t":"Construction of Seawall at Sitio Dalahican, Barangay San Jose, Roxas, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"ROXAS (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)","c":48995230.55,"abc":48999993.45,"fy":"2023","sd":"02/17/2023","cd":"2023-12-15","lat":12.614722,"lon":121.555833,"sm":1223,"fm":1223,"tm":1223,"am":1223,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4305},{"i":5681,"cid":"23B00009","pid":"P00725672LZ","t":"Construction of Balug Flood Control at Tumauini, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":109085393.8,"abc":109187000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-08-23","lat":17.252791,"lon":121.837619,"sm":1606,"fm":1606,"tm":null,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4306},{"i":5682,"cid":"21JA0122","pid":"P00522041MN","t":"Construction of Flood Control Structure at Latap River, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION","c":75410486.7,"abc":77200000.0,"fy":"2021","sd":"07/05/2021","cd":"2022-07-29","lat":7.123126,"lon":121.904225,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Latap","wn":"Latap River","wd":0.01,"wp":[7.12321,121.90421],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4307},{"i":5683,"cid":"23BG0001","pid":"P00726696LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Dicamay, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":48668725.8,"abc":48679424.61,"fy":"2023","sd":"03/15/2023","cd":"2023-09-15","lat":16.758521,"lon":122.00187,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dicamay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4308},{"i":5684,"cid":"22BD0039","pid":"P00620815LZ","t":"Cagayan River Flood Management Projects, San Isidro (Sta. 1+127 - Sta. 1+377), Iguig, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"IGUIG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-12-31","lat":17.771111,"lon":121.709722,"sm":631,"fm":631,"tm":631,"am":631,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.14,"wp":[17.76987,121.70938],"wst":"matched","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4309},{"i":5685,"cid":"23EI0022","pid":"P00727320LZ","t":"Construction of Baroc River Control Structure, Brgy. San Mariano Section, Roxas, Oriental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":82022284.76,"abc":82024995.07,"fy":"2023","sd":"03/24/2023","cd":"2023-12-15","lat":12.629444,"lon":121.435556,"sm":1223,"fm":923,"tm":1223,"am":1223,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Mariano Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4310},{"i":5686,"cid":"23BA0024","pid":"P00737440LZ","t":"Construction of Chariz Seawall (Phase II), Barangay Nakanmuan, Sabtang, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"JERIS CONSTRUCTION AND SUPPLY","c":7397729.67,"abc":9891344.0,"fy":"2023","sd":"04/04/2023","cd":"2024-11-13","lat":20.326634,"lon":121.838696,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nakanmuan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4311},{"i":5687,"cid":"22GF0009","pid":"P00630199VS","t":"Construction of Miagao Shoreline Protection/Seawall including Access Road, Miagao, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":48999199.58,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-04-10","lat":10.637477,"lon":122.237932,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4312},{"i":5688,"cid":"22EA0020","pid":"P00632925LZ","t":"Construction of Pili Flood Control, Barangay Pili, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SAMARAH CONSTRUCTION AND SUPPLY","c":4848665.0,"abc":4948000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-07-06","lat":13.4823,"lon":121.9045,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pili","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4313},{"i":5689,"cid":"22BD0037","pid":"P00620831LZ","t":"Construction of Flood Control System along Cagayan River, Brgy. Alibago, Enrile, Cagayan, Sta. 0+370-Sta. 0+770 (Upstream)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ENRILE (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT","c":92157500.0,"abc":92157500.0,"fy":"2022","sd":"03/28/2022","cd":"2023-12-19","lat":17.57,"lon":121.71,"sm":547,"fm":547,"tm":547,"am":547,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":1.04,"wp":[17.5748,121.70161],"wst":"matched","br":"Alibago","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":30,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":418},{"i":5690,"cid":"23JA0016","pid":"P00721593MN","t":"Construction of Flood Control Structure at Sinunuc Creek, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"HENSO CONSTRUCTION INC.","c":19550054.94,"abc":19600000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-08-22","lat":6.943884,"lon":122.004546,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Sinunuc","wn":"Sinunuc Creek","wd":0.37,"wp":[6.94174,122.00712],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4314},{"i":5691,"cid":"22BC0031","pid":"P00621041LZ","t":"Construction of Sta. Rosa Flood Control along Abulug River (Sta. 3+133 - Sta. 3+333), Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":48128215.0,"abc":49000000.0,"fy":"2022","sd":"02/23/2022","cd":"2023-02-28","lat":18.36219,"lon":121.43577,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.15,"wp":[18.36173,121.43448],"wst":"matched","br":null,"len":200.0,"ph":null,"dup":[],"run":[4909,5590],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BC0030 to 22BC0032) cover the same site, together worth PHP 146,128,215.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":566},{"i":5692,"cid":"23C00101","pid":"P00727283LZ","t":"Construction of Aguang Flood Control Structure, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. / 4VC BUILDERS & DEVELOPMENT CORP.","c":192999618.7,"abc":192999672.3,"fy":"2023","sd":"07/06/2023","cd":"2024-03-31","lat":15.785737,"lon":121.556318,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4315},{"i":5693,"cid":"23GF0025","pid":"P00721649VS","t":"Construction of Miagao Shoreline Protection/Seawall Including Access Road, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":48484748.19,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-02-27","lat":10.63689,"lon":122.23936,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4316},{"i":5694,"cid":"23CN0075","pid":"P00737444LZ","t":"Construction of Drainage Canal, Brgy. Buhangin, Baler, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"FORTHRIGHT CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-09-25","lat":15.76853,"lon":121.55648,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buhangin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4317},{"i":5695,"cid":"22BD0097","pid":"P00621500LZ","t":"Construction of Cagayan River Flood Control Structure, Natappian, Solana, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SOLANA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"RPF CONSTRUCTION","c":19001115.52,"abc":19300000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-03-13","lat":17.674908,"lon":121.712572,"sm":1476,"fm":1476,"tm":1476,"am":1476,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.18,"wp":[17.67357,121.71354],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4318},{"i":5696,"cid":"23EA0013","pid":"P00737545LZ","t":"Construction of Flood Control Structure, Barangay Banto, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"KURDZ CONSTRUCTION","c":9700039.98,"abc":9898000.0,"fy":"2023","sd":"01/31/2023","cd":"2023-05-10","lat":13.480832,"lon":121.906007,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4319},{"i":5697,"cid":"22DP0034","pid":"P00620592LZ","t":"Construction of Slope Protection along Mamali River at Brgy. Ilayang Taykin and Brgy. Ibabang Taykin, Liliw, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LILIW (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":43120000.0,"abc":43120000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-08-16","lat":14.134018,"lon":121.436494,"sm":789,"fm":789,"tm":789,"am":789,"md":0.0,"ls":"inside","ww":"Mamali","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ilayang Taykin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4320},{"i":5698,"cid":"24DK0073","pid":"P00846080LZ","t":"Construction of Box Culvert at Brgy. Pamatdan, Polillo, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"POLILLO (QUEZON)","deo":"Quezon 1st District Engineering Office","co":"C. VILLASEÑOR JR. CONSTRUCTION","c":4949850.67,"abc":4950000.0,"fy":"2024","sd":"05/28/2024","cd":"2024-08-10","lat":14.670693,"lon":122.00495,"sm":1158,"fm":1158,"tm":1158,"am":1158,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pamatdan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4321},{"i":5699,"cid":"21BH0172","pid":"P00525967LZ","t":"Construction of Dibulo Flood Control Project, Dibulo, Dinapigue Isabela, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":null,"deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":42140000.0,"abc":42140000.0,"fy":"2021","sd":"01/10/2022","cd":"2022-08-01","lat":16.507364,"lon":122.239811,"sm":null,"fm":null,"tm":null,"am":513,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":139},{"i":5700,"cid":"23PM0019","pid":"P00725657LZ","t":"Construction of Buringal Proper Flood Control, Sta. 065 + 267 - Sta. 065 + 867 (L.S.), Buringal, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"UPLAND CONSTRUCTION AND ENGINEERING SERVICES","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/01/2023","cd":"2023-10-17","lat":17.19834,"lon":121.55659,"sm":1102,"fm":1102,"tm":1102,"am":902,"md":0.76,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4322},{"i":5701,"cid":"22BA0043","pid":"P00632791LZ","t":"Construction of Flood Control Savang-Aksung, Barangay Nakanmuan, Sabtang, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"CVAP CONSTRUCTION","c":8338455.58,"abc":9900000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-12-31","lat":20.326201,"lon":121.83882,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nakanmuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4323},{"i":5702,"cid":"24BF0055","pid":"P00824892LZ","t":"Construction of Siffu River Flood Control Project, Barangay Suerte Phase III, Sta. 0+400 - Sta. 1+200, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96483409.58,"abc":96500000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-05-06","lat":17.100514,"lon":121.713295,"sm":1195,"fm":1195,"tm":1195,"am":262,"md":0.46,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.04,"wp":[17.1008,121.71314],"wst":"matched","br":"Suerte Phase III","len":800.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"implausibly_short","group":"risk","strength":0.5,"value":21,"text":"A PHP 96,483,410 contract recorded as completed 21 days after it started.","benign":"The start date may reflect a later phase or a re-encoded record."}],"rk":441},{"i":5703,"cid":"24EA0034","pid":"P00820403LZ","t":"Construction of Ogbac Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS) / G.T.J. CONSTRUCTION","c":88629520.01,"abc":88629390.0,"fy":"2024","sd":"02/19/2024","cd":"2024-11-23","lat":13.406936,"lon":121.907157,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4324},{"i":5704,"cid":"23DD0065","pid":"P00726543LZ","t":"Construction of Revetment along Lawaye River, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"THREE W BUILDERS, INC.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-18","lat":13.81084,"lon":121.43738,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.02,"wp":[13.81098,121.43736],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4325},{"i":5705,"cid":"22GF0049","pid":"P00620429VS","t":"Construction of Tumagbok River Flood Control Project, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"ABRIGHT BUILDERS CORPORATION","c":14664114.09,"abc":14700000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-12-03","lat":10.63861,"lon":122.239902,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":"Tumagbok","wn":"Tumagbok River","wd":0.26,"wp":[10.63981,122.24194],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4326},{"i":5706,"cid":"24CN0026","pid":"P00823461LZ","t":"Construction of Suklayin River Control Structure, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION / ALEXI LOUISSE CONSTRUCTION & GENERAL MERCHANDISE","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-12-14","lat":15.749077,"lon":121.559037,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":"Suklayin","wn":"Suklayin River","wd":0.07,"wp":[15.74863,121.55856],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4327},{"i":5707,"cid":"23DD0070","pid":"P00726552LZ","t":"Construction of Revetment along Lawaye River, Barangay Poctol, San Juan, Batangas","w":"Construction of Revetment","rg":"Region IV-A","pv":"BATANGAS","mu":"SAN JUAN (BATANGAS)","deo":"Batangas 4th District Engineering Office","co":"VICMAR CONSTRUCTION, INC. / FRANDEL CONSTRUCTION AND DEVELOPMENT CORP.","c":76235000.0,"abc":76235000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-26","lat":13.81104,"lon":121.43741,"sm":1311,"fm":1311,"tm":1311,"am":1311,"md":0.0,"ls":"inside","ww":"Lawaye","wn":"Lawaye River","wd":0.01,"wp":[13.81099,121.43742],"wst":"matched","br":"Poctol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4328},{"i":5708,"cid":"22BF0017","pid":"P00631120LZ","t":"Construction of Siffu River Flood Control Structure (Suerte Section Phase II), Brgy. Suerte, Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":41507408.17,"abc":42140000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-12-13","lat":17.109777,"lon":121.71395,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.02,"wp":[17.10986,121.7138],"wst":"matched","br":"Suerte","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4329},{"i":5709,"cid":"23BH0081","pid":"P00736189LZ","t":"Construction of Dicamay1 Flood Control Structure Section 2 Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48998504.16,"abc":49000000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-12-02","lat":16.589293,"lon":121.907969,"sm":673,"fm":673,"tm":null,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4330},{"i":5710,"cid":"22DL0037","pid":"P00620609LZ","t":"Construction of Flood Control Structure along Ilosong River, Plaridel, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PLARIDEL (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"JEMAK CONSTRUCTION & SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-14","lat":13.94133,"lon":122.005277,"sm":1153,"fm":1153,"tm":1153,"am":1153,"md":0.0,"ls":"inside","ww":"Ilosong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4331},{"i":5711,"cid":"23GA0144","pid":"P00733713VS","t":"Repair of Dam and Bank Protection in Tangalan, Aklan","w":"Repair/Maintenance of Flood Control Structures","rg":"Region VI","pv":"AKLAN","mu":"TANGALAN (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":9898994.31,"abc":9900000.0,"fy":"2023","sd":"05/22/2023","cd":"2024-02-07","lat":11.761327,"lon":122.242015,"sm":1543,"fm":1543,"tm":null,"am":1543,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4332},{"i":5712,"cid":"23E00006","pid":"P00736046LZ","t":"Construction of Mogpog Shore Protection/Boulevard, Sitio Ulong, Mogpog, Marinduque","w":"Construction of Revetment","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"MAG KONSTRUCTION & SUPPLY INC. / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":192995358.3,"abc":192999999.0,"fy":"2023","sd":"02/11/2023","cd":"2024-04-25","lat":13.4862,"lon":121.839,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4333},{"i":5713,"cid":"22P00066","pid":"P00620139LZ","t":"Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 4+503, San Jose, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION","c":65780190.0,"abc":65778152.24,"fy":"2022","sd":"08/09/2022","cd":"2023-07-21","lat":16.9444,"lon":121.5608,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":"Mariis Main","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":887.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4334},{"i":5714,"cid":"24BC0004","pid":"P00821220LZ","t":"Rehabilitation of Dugo Flood Control along Abulug River, Sta. 9+630 - Sta. 9+820, Abulug, Cagayan","w":"Rehabilitation / Major Repair of Flood Mitigation Facility","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"CMG JR. BUILDERS / J. AURELLANO CONSTRUCTION","c":72370157.8,"abc":72375000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-08-09","lat":18.407778,"lon":121.4375,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.09,"wp":[18.40753,121.43669],"wst":"matched","br":null,"len":190.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4335},{"i":5715,"cid":"21BG0003","pid":"P00525958LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Dalenat, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"Angadanan","deo":"Isabela 3rd District Engineering Office","co":"ADVANCED FOUNDATION CONSTRUCTION SYSTEMS CORP. / INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":29399986.97,"abc":29399980.73,"fy":"2021","sd":"04/13/2022","cd":"2022-11-03","lat":16.733905,"lon":121.715598,"sm":59,"fm":null,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.24,"wp":[16.73241,121.71401],"wst":"matched","br":"Dalenat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4336},{"i":5716,"cid":"23JA0067","pid":"P00734016MN","t":"Construction of Flood Mitigation Structure, Barangay Labuan, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"MOTHER'S ROLE CONSTRUCTION","c":29349867.01,"abc":29400000.0,"fy":"2023","sd":"04/24/2023","cd":"2023-08-25","lat":7.101111,"lon":121.908056,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4337},{"i":5717,"cid":"22GF0100","pid":"P00620086VS","t":"Construction of Igtalongon River Flood Control Project, Igbaras, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"IGBARAS (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"VEONG CONSTRUCTION & SUPPLY","c":4886195.03,"abc":4900000.0,"fy":"2022","sd":"08/04/2022","cd":"2022-12-19","lat":10.740899,"lon":122.242552,"sm":630,"fm":630,"tm":630,"am":630,"md":0.0,"ls":"inside","ww":"Igtalongon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4338},{"i":5718,"cid":"23BG0003","pid":"P00726697LZ","t":"Construction of Cagayan River Flood Control Project, Barangay District 3, Gamu, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":43438480.05,"abc":44099947.03,"fy":"2023","sd":"03/08/2023","cd":"2023-06-07","lat":17.070003,"lon":121.839711,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.14,"wp":[17.07105,121.84045],"wst":"matched","br":"District 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4339},{"i":5719,"cid":"23BG0079","pid":"P00727264LZ","t":"Construction of Flood Control Project along Cagayan River, Dalenat, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":95847472.62,"abc":95858908.16,"fy":"2023","sd":"03/15/2023","cd":"2023-08-18","lat":16.733033,"lon":121.716667,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[16.73145,121.71498],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5280,5950,5341],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BG0079 to 23BG0082) cover the same site, together worth PHP 382,239,595.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":294},{"i":5720,"cid":"23CN0041","pid":"P00737443LZ","t":"Construction of Drainage Canal, Barangay 4, Baler, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"RADIANCE TRADERS & BUILDERS","c":6930000.0,"abc":6930000.0,"fy":"2023","sd":"06/13/2023","cd":"2023-12-18","lat":15.75965,"lon":121.56234,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4340},{"i":5721,"cid":"23PL0019","pid":"P00736181LZ","t":"Construction of Flood Control Structure, New Tanglag, Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"QUIÑONES CONSTRUCTION","c":29100540.73,"abc":29126922.2,"fy":"2023","sd":"02/20/2023","cd":"2023-06-20","lat":17.46014,"lon":121.43776,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4341},{"i":5722,"cid":"23BA0017","pid":"P00726105LZ","t":"Construction of Guardwall along Sn Vicente-Savidug-Chavayan-Sumananga-Nakanmuan Rd, K0018 + 000 - K0018 + 029, Sabtang, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":9761069.11,"abc":9791344.0,"fy":"2023","sd":"02/15/2023","cd":"2023-06-15","lat":20.333639,"lon":121.840106,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4342},{"i":5723,"cid":"23GF0027","pid":"P00733296VS","t":"Construction of Guibongan-Kirayan Shoreline Protection including Access Road, Miagao, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MIAGAO (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":48456649.66,"abc":49000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-03-08","lat":10.636167,"lon":122.246664,"sm":971,"fm":971,"tm":971,"am":971,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4343},{"i":5724,"cid":"23EA0051","pid":"P00727178LZ","t":"Construction of Flood Control Structure along Mogpog River, Barangay Banto, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"R.S. TAGALA CONSTRUCTION AND EQUIPMENT RENTALS / SIXTEEN ENTERPRISES-CALAPAN BRANCH","c":48998898.55,"abc":48998000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-03-13","lat":13.479208,"lon":121.908064,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":"Mogpog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Banto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4344},{"i":5725,"cid":"22BF0078","pid":"P00621564LZ","t":"Rehabilitation of Siffu River Flood Control Structure (Suerte Section Phase II), Sta. 0 + 000 - Sta. 0 + 730, Brgy. Suerte, Quirino, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":67549855.42,"abc":67550000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-03-15","lat":17.110943,"lon":121.716718,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.13,"wp":[17.11151,121.7156],"wst":"matched","br":"Suerte","len":730.0,"ph":"Phase II","dup":[5730],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 115,798,754.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1085},{"i":5726,"cid":"24CN0025","pid":"P00820800LZ","t":"Construction of Kinalapan Flood Control Structure, Barangay Pingit, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-24","lat":15.748465,"lon":121.562345,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pingit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4345},{"i":5727,"cid":"24EH0112","pid":"P00823585LZ","t":"Construction of Baito Flood Control Structure Phase 2, Poctoy, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SCATR CONSTRUCTION","c":96484539.95,"abc":96499999.45,"fy":"2024","sd":"03/19/2024","cd":"2025-02-21","lat":12.405,"lon":122.0061,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4346},{"i":5728,"cid":"21BC0140","pid":"P00525952LZ","t":"Reconstruction of Dugo Flood Control Structure along Abulug River, Dugo, Banguian, Abulug, Cagayan Sta. 9+820 -Sta. 9+970 (R/S)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Abulug","deo":"Cagayan 2nd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/26/2021","cd":"2022-07-11","lat":18.40661,"lon":121.43785,"sm":3,"fm":null,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.09,"wp":[18.40646,121.437],"wst":"matched","br":null,"len":150.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4347},{"i":5729,"cid":"22EA0039","pid":"P00632926LZ","t":"Construction of San Miguel Drainage System, Barangay San Miguel, Boac, Marinduque","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"YURUSA CONSTRUCTION & DEVELOPMENT CORP.","c":14792987.32,"abc":14848000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-08-04","lat":13.4491,"lon":121.8405,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4348},{"i":5730,"cid":"23BF0018","pid":"P00726423LZ","t":"Construction of Siffu River Flood Control Project (Suerte Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Suerte, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":48248898.3,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-09-24","lat":17.110943,"lon":121.716718,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.13,"wp":[17.11151,121.7156],"wst":"matched","br":"Suerte","len":400.0,"ph":"Phase II","dup":[5725],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 115,798,754.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1105},{"i":5731,"cid":"23BC0066","pid":"P00727269LZ","t":"Construction of Dugo Flood Control along Abulug River, Abulug, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"ABULUG (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-22","lat":18.40495,"lon":121.43812,"sm":3,"fm":3,"tm":3,"am":3,"md":0.0,"ls":"inside","ww":"Abulug","wn":"Abulug River","wd":0.1,"wp":[18.40493,121.43716],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4349},{"i":5732,"cid":"23BE0042","pid":"P00726123LZ","t":"Construction of Flood Control Project along Rugo Brook, barangay San Lorenzo, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48994848.5,"abc":49000000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-11-08","lat":17.2193,"lon":121.9106,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4350},{"i":5733,"cid":"24BH0258","pid":"P00845944LZ","t":"Construction of Slope Protection along Villagonzaga-Nabbuan Road, Villagonzaga-Nabbuan, Santiago City, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"CASAN CONSTRUCTION AND TRADING","c":4939562.86,"abc":4950000.0,"fy":"2024","sd":"06/19/2024","cd":"2024-09-14","lat":16.657865,"lon":121.563471,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4351},{"i":5734,"cid":"22JA0021","pid":"P00630565MN","t":"Construction of Slope Protection Structure, Sinunuc, Zamboanga City","w":"Construction of Slope Protection Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"TEDDIE CONSTRUCTION DEVELOPMENT, INC.","c":19599660.32,"abc":19600000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-12-21","lat":6.937071,"lon":122.006869,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4352},{"i":5735,"cid":"22DL0061","pid":"P00620607LZ","t":"Construction of Flood Control along Bocboc Creek, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-11-09","lat":13.890082,"lon":122.25613,"sm":809,"fm":809,"tm":809,"am":809,"md":0.0,"ls":"inside","ww":"Bocboc","wn":"Bocboc Creek","wd":0.0,"wp":[13.89011,122.25612],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4353},{"i":5736,"cid":"23BG0033","pid":"P00726692LZ","t":"Construction of Cagayan River Flood Control Project, Barangay Roxas, Naguilian, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":43783286.72,"abc":44099994.23,"fy":"2023","sd":"03/14/2023","cd":"2023-06-16","lat":17.036692,"lon":121.840878,"sm":1008,"fm":1008,"tm":1008,"am":563,"md":0.05,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.08,"wp":[17.03599,121.84074],"wst":"matched","br":"Roxas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4354},{"i":5737,"cid":"21BH0178","pid":"P00525565LZ","t":"Construction of Nabbuan Flood Control Structure, Nabbuan, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"City of Santiago","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/07/2021","cd":"2022-09-27","lat":16.678723,"lon":121.566375,"sm":420,"fm":null,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4355},{"i":5738,"cid":"23DM0067","pid":"P00742442LZ","t":"Construction of Flood Control Structure along Agdangan River, Agdangan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"AGDANGAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":24750000.0,"abc":24499634.5,"fy":"2023","sd":"03/30/2023","cd":"2023-08-15","lat":13.870053,"lon":121.911347,"sm":6,"fm":6,"tm":6,"am":6,"md":0.0,"ls":"inside","ww":"Agdangan","wn":"Agdangan River","wd":0.01,"wp":[13.87009,121.91142],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01022,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":927},{"i":5739,"cid":"22EI0041","pid":"P00632937LZ","t":"Construction of Bongabong River Control, Barangay San Jose Section, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"E E CONSTRUCTION","c":17324354.24,"abc":17324395.64,"fy":"2022","sd":"02/16/2022","cd":"2022-07-26","lat":12.668056,"lon":121.440278,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.35,"wp":[12.67041,121.43811],"wst":"matched","br":"San Jose Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4356},{"i":5740,"cid":"23BG0095","pid":"P00726701LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Daragutan West, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":48184997.98,"abc":48679457.26,"fy":"2023","sd":"04/04/2023","cd":"2023-11-10","lat":16.914928,"lon":122.007842,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Daragutan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4357},{"i":5741,"cid":"23DL0039","pid":"P00726232LZ","t":"Construction of Flood Control Structure along Bocboc Creek, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-01-14","lat":13.8812,"lon":122.2574,"sm":809,"fm":809,"tm":809,"am":809,"md":0.0,"ls":"inside","ww":"Bocboc","wn":"Bocboc Creek","wd":0.0,"wp":[13.88122,122.2574],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4358},{"i":5742,"cid":"22BG0081","pid":"P00631122LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. District 2, Gamu, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43172489.53,"abc":44099998.29,"fy":"2022","sd":"03/28/2022","cd":"2022-11-08","lat":17.06805,"lon":121.841608,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.18,"wp":[17.06923,121.84271],"wst":"matched","br":"District 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4359},{"i":5743,"cid":"23BC0101","pid":"P00742300LZ","t":"Construction of Alannay River Control Structure along Zinundungan River, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"HHK CONSTRUCTION","c":4800079.75,"abc":4950000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-06-17","lat":18.057643,"lon":121.56701,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":"Alannay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4360},{"i":5744,"cid":"23DM0063","pid":"P00742169LZ","t":"Construction of Flood Control Structure along Agdangan River (Phase II), Agdangan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"AGDANGAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":99000000.0,"abc":96499426.07,"fy":"2023","sd":"04/11/2023","cd":"2023-12-06","lat":13.875736,"lon":121.911853,"sm":6,"fm":6,"tm":6,"am":6,"md":0.0,"ls":"inside","ww":"Agdangan","wn":"Agdangan River","wd":0.01,"wp":[13.87575,121.91195],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":442},{"i":5745,"cid":"22JA0005","pid":"P00631082MN","t":"Construction of Shore Protection at Busugan Section, Barangay Sinubong, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":39549988.07,"abc":39195927.69,"fy":"2022","sd":"03/23/2022","cd":"2022-10-17","lat":7.03072,"lon":121.912905,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinubong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00903,"text":"Contract cost is 0.90% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":844},{"i":5746,"cid":"24BG0180","pid":"P00824867LZ","t":"Construction of Flood Control Structure along Cagayan River, Phase 2, Barangay Dalenat, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION / ALGO CONSTRUCTION AND POWER DEVELOPMENT, INC.","c":77164336.44,"abc":77199975.42,"fy":"2024","sd":"07/17/2024","cd":"2025-02-28","lat":16.730828,"lon":121.718819,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.24,"wp":[16.72928,121.71717],"wst":"matched","br":"Dalenat","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4361},{"i":5747,"cid":"23BG0106","pid":"P00726699LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Palutan, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":48504957.56,"abc":48999987.13,"fy":"2023","sd":"04/25/2023","cd":"2023-09-18","lat":16.971486,"lon":122.008589,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Palutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4362},{"i":5748,"cid":"23EA0063","pid":"P00742453LZ","t":"Construction of Damaged Flood Control Structure, Brgy. Maligaya, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":18550221.21,"abc":19798000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-09-19","lat":13.48263,"lon":121.841776,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maligaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4363},{"i":5749,"cid":"22GA0028","pid":"P00620075VS","t":"Construction of Revetment Wall along Tangalan River, Sta. 0+000.00 to Sta. 0+337.00, Brgy. Tondog, Tangalan, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"TANGALAN (AKLAN)","deo":"Aklan District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999981.58,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-11-20","lat":11.773431,"lon":122.2578,"sm":1543,"fm":1543,"tm":1543,"am":1543,"md":0.0,"ls":"inside","ww":"Tangalan","wn":"Tangalan River","wd":0.02,"wp":[11.77328,122.25783],"wst":"matched","br":"Tondog","len":337.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4364},{"i":5750,"cid":"24BF0001","pid":"P00820171LZ","t":"Construction of Siffu River Flood Control Project (Barangay Simimbaan Phase II), Sta. 0+960 - Sta. 1+760, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":89383813.47,"abc":89384090.0,"fy":"2024","sd":"02/12/2024","cd":"2024-04-06","lat":17.136624,"lon":121.568463,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":4.84,"wp":[17.13098,121.61355],"wst":"matched","br":"Simimbaan Phase II","len":800.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.84,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 4.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":301},{"i":5751,"cid":"23BH0151","pid":"P00727112LZ","t":"Construction of Barangay Fugo Flood Control Structure, Sta. 0+000 - Sta. 0+350, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":48997541.39,"abc":49000000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-08-17","lat":16.532203,"lon":121.719041,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fugo Flood Control Structure","len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4365},{"i":5752,"cid":"22EI0048","pid":"P00632938LZ","t":"Construction of Box Culvert at Bonbon, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"J.A. BUILDERS AND SUPPLY","c":4949872.82,"abc":4949844.51,"fy":"2022","sd":"04/11/2022","cd":"2022-09-11","lat":12.543333,"lon":121.440278,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4366},{"i":5753,"cid":"24BA0010","pid":"P00820777LZ","t":"Construction of Sumnanga Seawall, Sabtang, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":9779993.66,"abc":9800000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-05-28","lat":20.301038,"lon":121.842315,"sm":1229,"fm":1229,"tm":1229,"am":1229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4367},{"i":5754,"cid":"22BA0032","pid":"P00632796LZ","t":"Rehabilitation of Katuvang Seawall, Barangay Sumnanga, Sabtang, Batanes","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"BATANES","mu":"SABTANG (BATANES)","deo":"Batanes District Engineering Office","co":"CVAP CONSTRUCTION","c":5973946.32,"abc":6930000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-11-09","lat":20.36763,"lon":121.914065,"sm":1229,"fm":1229,"tm":1229,"am":656,"md":5.35,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sumnanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.35,"text":"The pin is 5.3 km outside Sabtang, Batanes, the nearest municipality the record claims. It falls in Ivana, Batanes.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":360},{"i":5755,"cid":"24EH0109","pid":"P00823597LZ","t":"Construction of Flood Mitigation Structure along Limon Sur (Phase 2), Looc, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"LOOC (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":91674999.76,"abc":91674999.95,"fy":"2024","sd":"04/08/2024","cd":"2024-09-23","lat":12.2933,"lon":122.0088,"sm":806,"fm":806,"tm":806,"am":806,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4368},{"i":5756,"cid":"22GA0023","pid":"P00620010VS","t":"Construction of Revetment Wall along Tangalan River, Brgy. Baybay, Tangalan, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"TANGALAN (AKLAN)","deo":"Aklan District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":86849991.48,"abc":86850000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-01-25","lat":11.771335,"lon":122.260481,"sm":1543,"fm":1543,"tm":1543,"am":1543,"md":0.0,"ls":"inside","ww":"Tangalan","wn":"Tangalan River","wd":0.02,"wp":[11.77148,122.26061],"wst":"matched","br":"Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4369},{"i":5757,"cid":"23BG0034","pid":"P00726429LZ","t":"Rehabilitation of Cagayan River Control, Barangay Minanga, Roxas, Sta.0+284.4 - Sta 0+605.6, Naguillian, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43116512.02,"abc":43136512.02,"fy":"2023","sd":"03/15/2023","cd":"2023-07-20","lat":17.037236,"lon":121.842958,"sm":1008,"fm":1008,"tm":1008,"am":563,"md":0.09,"ls":"boundary","ww":"Cagayan","wn":"Cagayan River","wd":0.12,"wp":[17.0362,121.84319],"wst":"matched","br":"Minanga","len":321.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4370},{"i":5758,"cid":"23BC0063","pid":"P00727271LZ","t":"Construction of Chico River Control Structure along Chico River, Sto. Niño, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTO NIÑO (FAIRE) (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"AGAFER CONSTRUCTION AND TRADING CORPORATION (FOR: AGAFER CONSTRUCTION AND TRADING)","c":48229745.38,"abc":49215000.0,"fy":"2023","sd":"03/20/2023","cd":"2024-02-06","lat":17.858187,"lon":121.569926,"sm":1412,"fm":1412,"tm":1412,"am":1412,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.15,"wp":[17.85788,121.56858],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4371},{"i":5759,"cid":"23BH0181","pid":"P00740316LZ","t":"Construction of Barangay Palagao Flood Control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":96499663.2,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-09-04","lat":16.548586,"lon":121.719059,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palagao Flood Control Structure","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4372},{"i":5760,"cid":"23CN0040","pid":"P00737442LZ","t":"Construction of Box Culvert, Diome, Maria Aurora, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"VANMARVIL CONSTRUCTION","c":5763972.54,"abc":5940000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-10-23","lat":15.77333,"lon":121.44037,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4373},{"i":5761,"cid":"23BG0038","pid":"P00726691LZ","t":"Construction of Cagayan River Flood Control Project, Barangay District 2, Gamu, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":43437238.0,"abc":44099995.81,"fy":"2023","sd":"03/08/2023","cd":"2023-06-05","lat":17.064252,"lon":121.843725,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.31,"wp":[17.06609,121.8459],"wst":"matched","br":"District 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4374},{"i":5762,"cid":"22BD0032","pid":"P00621044LZ","t":"Construction of Drainage System along Tuguegarao Diversion Road 2 (K0482+471 - K0488+071), Tuguegarao City","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"DEKM CONSTRUCTION","c":15680000.0,"abc":15680000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-06-15","lat":17.625449,"lon":121.719383,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4375},{"i":5763,"cid":"24BH0299","pid":"P00843181LZ","t":"Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"09/24/2024","cd":"2025-02-15","lat":16.53318,"lon":122.262131,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4376},{"i":5764,"cid":"22BE0032","pid":"P00621051LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+944), Brgy. Fugu, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48949706.95,"abc":48999706.95,"fy":"2022","sd":"02/24/2022","cd":"2022-11-09","lat":17.115819,"lon":121.916199,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.36,"wp":[17.11901,121.91551],"wst":"matched","br":"Fugu","len":944.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4377},{"i":5765,"cid":"23BG0128","pid":"P00726443LZ","t":"Construction of Pinacanauan River Flood Control Project, Barangay Zone 1, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"RRC CO. INC. (FORMERLY: R R C CONSTRUCTION)","c":96301840.45,"abc":96499992.77,"fy":"2023","sd":"06/08/2023","cd":"2024-04-22","lat":16.980961,"lon":122.00887,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zone 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4378},{"i":5766,"cid":"22ED0121","pid":"P00639525LZ","t":"Construction of Casiligan River Control, Brgy. Zone 2, Pola, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"POLA (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"MARC JILL CONSTRUCTION","c":7839977.45,"abc":7840000.0,"fy":"2022","sd":"07/14/2022","cd":"2022-10-14","lat":13.14,"lon":121.4406,"sm":1155,"fm":1155,"tm":1155,"am":1155,"md":0.0,"ls":"inside","ww":"Casiligan","wn":"Casiligan River","wd":0.21,"wp":[13.14104,121.44224],"wst":"matched","br":"Zone 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":588},{"i":5767,"cid":"23BH0175","pid":"P00740315LZ","t":"Construction of Barangay Palagao Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-09-08","lat":16.551188,"lon":121.719825,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palagao Flood Control Structure","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4379},{"i":5768,"cid":"22BH0057","pid":"P00620823LZ","t":"Construction of Flood Control along Ganano River at Batal (Sta. 0+000 - Sta. 0+400), Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":70445000.0,"abc":70445000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-18","lat":16.689184,"lon":121.570018,"sm":420,"fm":420,"tm":null,"am":420,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.03,"wp":[16.68941,121.5699],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[5810,5826],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BH0057 to 22BH0060) cover the same site, together worth PHP 211,110,626.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":443},{"i":5769,"cid":"23JA0017","pid":"P00721358MN","t":"Construction of Flood Control Structure at Tinuba River Sinubong, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"JM2K CONSTRUCTION","c":41109966.96,"abc":41160000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-10-25","lat":7.028333,"lon":121.918611,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Tinuba","wn":"Tinuba River","wd":0.0,"wp":[7.02837,121.91861],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4380},{"i":5770,"cid":"22EH0016","pid":"P00620669LZ","t":"Construction of Calunacon Causeway, San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR / SCATR CONSTRUCTION","c":29400000.0,"abc":29399999.47,"fy":"2022","sd":"02/28/2022","cd":"2022-12-01","lat":12.54,"lon":122.0089,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":521},{"i":5771,"cid":"22DL0145","pid":"P00620614LZ","t":"Construction of Flood Control Structure, Talolong River, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-01-16","lat":13.88056,"lon":122.264309,"sm":809,"fm":809,"tm":809,"am":809,"md":0.0,"ls":"inside","ww":"Talolong","wn":"Talolong River","wd":0.0,"wp":[13.88056,122.26429],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4381},{"i":5772,"cid":"24BH0110","pid":"P00843230LZ","t":"Construction of Bautista Flood Control Structure, Section 2, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96400000.0,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-08-10","lat":16.451966,"lon":121.844159,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4382},{"i":5773,"cid":"23DL0041","pid":"P00726234LZ","t":"Construction of Flood Control Structure, Talolong River, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-30","lat":13.879039,"lon":122.265533,"sm":809,"fm":809,"tm":809,"am":809,"md":0.0,"ls":"inside","ww":"Talolong","wn":"Talolong River","wd":0.03,"wp":[13.87887,122.26576],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4383},{"i":5774,"cid":"24BE0017","pid":"P00821202LZ","t":"Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":139912867.3,"abc":139925000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-09-20","lat":17.12102,"lon":121.91999,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.11,"wp":[17.12002,121.92026],"wst":"matched","br":"Alinguigan 1st","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4384},{"i":5775,"cid":"22CN0122","pid":"P00631166LZ","t":"Construction of Seawall, Brgy. Sabang, Baler, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"BALER (CAPITAL) (AURORA)","deo":"Aurora District Engineering Office","co":"R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M.  CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-12-16","lat":15.757516,"lon":121.571207,"sm":127,"fm":127,"tm":127,"am":127,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4385},{"i":5776,"cid":"22BD0040","pid":"P00620822LZ","t":"Construction of Drainage System along Caritan- Balzain Creek Sta.0+(-280) - Sta. 0+(-689.20), Caritan, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"RPF CONSTRUCTION","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-06-20","lat":17.63,"lon":121.72,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Caritan-Balzain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":440},{"i":5777,"cid":"22PJ0044","pid":"P00620481LZ","t":"Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"AGUINALDO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":31817660.0,"abc":76237286.54,"fy":"2022","sd":"05/23/2022","cd":"2023-03-05","lat":16.93091,"lon":121.44129,"sm":12,"fm":12,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":510.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4386},{"i":5778,"cid":"24BH0272","pid":"P00843287LZ","t":"Construction of Digumased Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 760, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/19/2024","cd":"2024-12-07","lat":16.532413,"lon":122.26647,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":760.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4387},{"i":5779,"cid":"22BD0033","pid":"P00621043LZ","t":"Construction of Drainage Along Bagay Road, Phase II, Tuguegarao City","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":17287200.0,"abc":17287200.0,"fy":"2022","sd":"03/23/2022","cd":"2023-03-22","lat":17.623536,"lon":121.721208,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[5781],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 36,587,200.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1029},{"i":5780,"cid":"24EH0108","pid":"P00823598LZ","t":"Construction of Flood Mitigation Structure along Limon Sur (Phase 1), Looc, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"LOOC (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":91672764.45,"abc":91674999.95,"fy":"2024","sd":"04/08/2024","cd":"2024-09-23","lat":12.2933,"lon":122.0089,"sm":806,"fm":806,"tm":806,"am":806,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4388},{"i":5781,"cid":"22BD0098","pid":"P00621244LZ","t":"Construction of Drainage along Bagay Road, Tuguegarao City, Phase III","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"JTM CONSTRUCTION","c":19300000.0,"abc":19300000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-06-26","lat":17.623536,"lon":121.721208,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[5779],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 36,587,200.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1030},{"i":5782,"cid":"24DH0035","pid":"P00844542LZ","t":"Construction of Flood Control Structure along Balanac River, Barangay Sampaloc Dos, Pansanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96499165.86,"abc":96500000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-10-04","lat":14.26611,"lon":121.44638,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":"Balanac","wn":"Balanac River","wd":0.04,"wp":[14.26612,121.44679],"wst":"matched","br":"Sampaloc Dos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4389},{"i":5783,"cid":"24GF0056","pid":"P00821047VS","t":"Construction of Flood Control Structure along Tangyan, River, Igbaras, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"IGBARAS (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GALENO CONSTRUCTION, INC.","c":14596493.95,"abc":14700000.0,"fy":"2024","sd":"03/20/2024","cd":"2024-08-12","lat":10.71874,"lon":122.26692,"sm":630,"fm":630,"tm":630,"am":630,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4390},{"i":5784,"cid":"22JA0011","pid":"P00620110MN","t":"Construction of Zamboanga Economic Zone Seafront, San Ramon Shoreline Protection, San Ramon, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"YN BUILDERS AND SUPPLY","c":19071820.96,"abc":24499642.36,"fy":"2022","sd":"02/28/2022","cd":"2022-11-28","lat":7.001103,"lon":121.920257,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4391},{"i":5785,"cid":"22BF0047","pid":"P00621480LZ","t":"Construction of Siffu River Flood Control Project (San Placido Upstream Section), Barangay San Placido, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":48996572.12,"abc":49000000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-04","lat":17.140122,"lon":121.57337,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":4.39,"wp":[17.13098,121.61355],"wst":"matched","br":"San Placido","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.39,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 4.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":347},{"i":5786,"cid":"23JA0014","pid":"P00721354MN","t":"Construction of Flood Control Structure at Busugan River, Sinubong, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"WENKON CONSTRUCTION SERVICES","c":29218092.67,"abc":29285877.45,"fy":"2023","sd":"02/16/2023","cd":"2023-11-15","lat":7.034167,"lon":121.920278,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Busugan","wn":"Busugan River","wd":0.01,"wp":[7.03429,121.92028],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4392},{"i":5787,"cid":"23BG0039","pid":"P00726431LZ","t":"Rehabilitation of Cagayan River Control, Barangay District 2, Sta 0+286 - Sta 0+668, Gamu, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43116483.57,"abc":43136507.81,"fy":"2023","sd":"03/15/2023","cd":"2023-06-07","lat":17.062548,"lon":121.844233,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.38,"wp":[17.06455,121.84708],"wst":"matched","br":"District 2","len":382.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4393},{"i":5788,"cid":"22BA0041","pid":"P00632794LZ","t":"Construction of Sayed Flood Control, Barangay Salagao, Ivana, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"IVANA (BATANES)","deo":"Batanes District Engineering Office","co":"REMAR CONSTRUCTION","c":4770046.3,"abc":4794000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-09-25","lat":20.378037,"lon":121.920898,"sm":656,"fm":656,"tm":656,"am":656,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salagao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4394},{"i":5789,"cid":"24BF0052","pid":"P00845942LZ","t":"Construction of Flood Control Structure, Brgy. Sto. Nino, Aurora, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"AURORA (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"R.E.A. CONSTRUCTION","c":4902860.34,"abc":4950000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-06-02","lat":16.949702,"lon":121.575497,"sm":83,"fm":83,"tm":83,"am":83,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4395},{"i":5790,"cid":"21JA0047","pid":"P00522142MN","t":"Construction of Shoreline Protection, San Ramon Section, Talisayan, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"Zamboanga City","deo":"Zamboanga City 2nd District Engineering Office","co":"MCGABRIEL CONSTRUCTION / AQUATERRA KONSTRUKT INC.","c":41992237.57,"abc":49000000.0,"fy":"2021","sd":"06/15/2021","cd":"2022-09-13","lat":6.997869,"lon":121.921057,"sm":1642,"fm":null,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4396},{"i":5791,"cid":"24BH0182","pid":"P00843229LZ","t":"Construction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-11-12","lat":16.444673,"lon":121.844409,"sm":1250,"fm":1250,"tm":1250,"am":1250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4397},{"i":5792,"cid":"23JA0038","pid":"P00732469MN","t":"Construction of Drainage System, Barangay Sinunuc, Zamboanga City, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"RME CONSTRUCTION AND ENTERPRISES","c":4879296.3,"abc":4900000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-08-24","lat":6.929561,"lon":122.008954,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinunuc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4398},{"i":5793,"cid":"23BH0082","pid":"P00736609LZ","t":"Construction of Ayod Flood control Structure, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-09-18","lat":16.571038,"lon":122.268009,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4399},{"i":5794,"cid":"21BG0117","pid":"P00561455LZ","t":"Construction of Flood Control Structure along Magat River Bank - Barangay San Roque, San Mateo, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"San Mateo","deo":"Isabela 3rd District Engineering Office","co":"C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":96497593.3,"abc":96499999.82,"fy":"2021","sd":"11/23/2021","cd":"2022-10-10","lat":16.913939,"lon":121.576208,"sm":1328,"fm":null,"tm":1328,"am":1328,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.21,"wp":[16.91439,121.5781],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4400},{"i":5795,"cid":"23DH0041","pid":"P00742432LZ","t":"Rehabilitation of Bank along Inawasan River, Famy, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"FAMY (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"DMLC BUILDERS","c":98009253.72,"abc":98010000.0,"fy":"2023","sd":"03/25/2023","cd":"2024-03-08","lat":14.450367,"lon":121.448156,"sm":555,"fm":555,"tm":555,"am":555,"md":0.0,"ls":"inside","ww":"Inawasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4401},{"i":5796,"cid":"22BF0072","pid":"P00621155LZ","t":"Construction of Siffu River Flood Control Project (Sinait Section), Quirino, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"ANORE CONSTRUCTION / RR BUILDERS","c":96311346.48,"abc":96500000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-04-17","lat":17.106186,"lon":121.721289,"sm":1195,"fm":1195,"tm":1195,"am":1195,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":0.3,"wp":[17.10664,121.72403],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5078,5091],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BF0072 to 22BF0074) cover the same site, together worth PHP 289,306,945.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":295},{"i":5797,"cid":"22EH0052","pid":"P00621488LZ","t":"Construction of Sawang Flood Mitigationf Structrure (Upstream), Romblon, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ROMBLON (CAPITAL) (ROMBLON)","deo":"Romblon District Engineering Office","co":"MT. GUITING-GUITING CONSTRUCTION","c":24499640.14,"abc":24499999.5,"fy":"2022","sd":"04/11/2022","cd":"2022-10-19","lat":12.55,"lon":122.268611,"sm":1213,"fm":1213,"tm":1213,"am":1213,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":539},{"i":5798,"cid":"23BE0062","pid":"P00726455LZ","t":"Construction of Flood Mitigation Structure along Ilagan River, Brgy. Alinguigan 1st, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":96177084.0,"abc":96200000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-08-10","lat":17.1217,"lon":121.9242,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.11,"wp":[17.12071,121.92416],"wst":"matched","br":"Alinguigan 1st","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4402},{"i":5799,"cid":"25ED0075","pid":"P00921190LZ","t":"Construction of Drainage System, Mag-Asawang Tubig RIS, Naujan, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"NAUJAN (ORIENTAL MINDORO)","deo":"Mindoro Oriental District Engineering Office","co":"CEFF TRADING & ENGINEERING SERVICES / JUWAWI CORPORATION","c":14699999.28,"abc":14700000.0,"fy":"2025","sd":"02/18/2025","cd":"2025-05-26","lat":12.154167,"lon":122.009167,"sm":1017,"fm":1017,"tm":1017,"am":1385,"md":132.36,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":132.36,"text":"The pin is 132.4 km outside Naujan, Oriental Mindoro, the nearest municipality the record claims. It falls in Santa Fe, Romblon.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":249},{"i":5800,"cid":"24BD0079","pid":"P00825229LZ","t":"Construction of Cagayan River Flood Management Projects, Centro, Amulung, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"AMULUNG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"VHT CAGAYAN BUILDERS CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"05/15/2024","cd":"2024-07-30","lat":17.834431,"lon":121.722236,"sm":54,"fm":54,"tm":54,"am":54,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.14,"wp":[17.83415,121.72095],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4403},{"i":5801,"cid":"22PL0003","pid":"P00621006LZ","t":"Construction of Flood Control Structure along Cal-owan River, Sta. 2 + 430 - Sta. 3 + 380 (Left Bank), Brgy. Ammacian to Brgy. Malagnat, Pinukpuk, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"PINUKPUK (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"JTM CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48449186.44,"abc":48983118.75,"fy":"2022","sd":"02/15/2022","cd":"2023-01-05","lat":17.34975,"lon":121.57623,"sm":1145,"fm":1145,"tm":1145,"am":1185,"md":23.5,"ls":"outside","ww":"Cal-owan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ammacian","len":950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":50,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.5,"text":"The pin is 23.5 km outside Pinukpuk, Kalinga, the nearest municipality the record claims. It falls in Quezon, Isabela.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":190},{"i":5802,"cid":"22DP0018","pid":"P00620594LZ","t":"Construction of Slope Protection for Bungkol Bridge, Bungkol River at Liliw, Laguna","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LILIW (LAGUNA)","deo":"Laguna 3rd District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":43028860.0,"abc":43028860.0,"fy":"2022","sd":"01/28/2022","cd":"2023-08-24","lat":14.135089,"lon":121.448157,"sm":789,"fm":789,"tm":null,"am":789,"md":0.0,"ls":"inside","ww":"Bungkol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4404},{"i":5803,"cid":"24BH0294","pid":"P00843234LZ","t":"Construction of Dimaluade Flood Control Structure, Section 2, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96297431.08,"abc":96500000.0,"fy":"2024","sd":"08/14/2024","cd":"2025-02-03","lat":16.568452,"lon":122.268629,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4405},{"i":5804,"cid":"24BG0065","pid":"P00824872LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONSTRUCTION SERVICES","c":144724100.0,"abc":144749997.6,"fy":"2024","sd":"03/27/2024","cd":"2024-07-25","lat":17.060958,"lon":121.844583,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.45,"wp":[17.06336,121.84799],"wst":"matched","br":"District 2","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4406},{"i":5805,"cid":"24DL0020","pid":"P00820919LZ","t":"Construction of Flood Control Structure along Sangirin River, Perez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PEREZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":4899985.77,"abc":4900000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-08-08","lat":14.197364,"lon":121.924537,"sm":1121,"fm":1121,"tm":1121,"am":1121,"md":0.0,"ls":"inside","ww":"Sangirin","wn":"Sangirin River","wd":0.01,"wp":[14.19734,121.92459],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4407},{"i":5806,"cid":"24EH0099","pid":"P00823587LZ","t":"Construction of Libertad Flood Control Structure (Downstream), Libertad, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SCATR CONSTRUCTION","c":109372135.0,"abc":109372134.5,"fy":"2024","sd":"03/19/2024","cd":"2024-09-18","lat":12.4503,"lon":122.0092,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4408},{"i":5807,"cid":"24DL0021","pid":"P00820924LZ","t":"Construction of Seawall in Barangay Villa Manzano Norte, Perez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PEREZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":4826371.91,"abc":4900000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-08-08","lat":14.222325,"lon":121.924805,"sm":1121,"fm":1121,"tm":1121,"am":1121,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Manzano Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4409},{"i":5808,"cid":"24DH0029","pid":"P00844543LZ","t":"Construction of Flood Control Structure along Inawasan River, Famy, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"FAMY (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":96499996.4,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-12","lat":14.44747,"lon":121.448653,"sm":555,"fm":555,"tm":555,"am":555,"md":0.0,"ls":"inside","ww":"Inawasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4410},{"i":5809,"cid":"24BH0194","pid":"P00843251LZ","t":"Construction of Disimpit Flood Control Structure, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"CASAN CONSTRUCTION AND TRADING","c":72375000.0,"abc":72375000.0,"fy":"2024","sd":"05/28/2024","cd":"2024-08-20","lat":16.557141,"lon":121.722238,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4411},{"i":5810,"cid":"22BH0059","pid":"P00620825LZ","t":"Construction of Flood Control along Ganano River at Batal (Sta. 0+800 - Sta. 1+300), Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":71185884.17,"abc":71186120.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-25","lat":16.68629,"lon":121.5765,"sm":420,"fm":420,"tm":null,"am":420,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.05,"wp":[16.68648,121.5761],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[5768,5826],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BH0057 to 22BH0060) cover the same site, together worth PHP 211,110,626.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":444},{"i":5811,"cid":"24BG0030","pid":"P00821567LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Roxas Section, Naguilian, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"NAGUILIAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"A. DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: A. DE GUIA CONSTRUCTION)","c":48941780.88,"abc":48999987.96,"fy":"2024","sd":"02/20/2024","cd":"2024-06-07","lat":17.033697,"lon":121.845114,"sm":1008,"fm":1008,"tm":1008,"am":1008,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.31,"wp":[17.03647,121.8445],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4412},{"i":5812,"cid":"24GF0117","pid":"P00832628VS","t":"Construction of Igbaras River Control Structure, Igbaras, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"IGBARAS (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"RINEL CONSTRUCTION SERVICES","c":19749811.34,"abc":19800000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-09-25","lat":10.716607,"lon":122.269367,"sm":630,"fm":630,"tm":630,"am":630,"md":0.0,"ls":"inside","ww":"Igbaras","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4413},{"i":5813,"cid":"22JA0017","pid":"P00620109MN","t":"Construction of Shoreline Protection at Sinunuc Section, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"BENRAM CONSTRUCTION","c":39253426.63,"abc":39581710.0,"fy":"2022","sd":"02/23/2022","cd":"2022-12-12","lat":6.929306,"lon":122.009436,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4414},{"i":5814,"cid":"24DL0031","pid":"P00820912LZ","t":"Construction of Breakwater, Perez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"PEREZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":9797696.23,"abc":9800000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-30","lat":14.191243,"lon":121.92578,"sm":1121,"fm":1121,"tm":1121,"am":1121,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4415},{"i":5815,"cid":"21EH0093","pid":"P00561143LZ","t":"Construction of Seawall at Poblacion, Looc, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"Looc","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":19300000.0,"abc":19299999.5,"fy":"2021","sd":"01/13/2022","cd":"2022-07-07","lat":12.243333,"lon":122.009444,"sm":806,"fm":null,"tm":806,"am":806,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4416},{"i":5816,"cid":"22BD0046","pid":"P00620811LZ","t":"Cagayan River Flood Management Projects, Anquiray (Sta. 0+480 - Sta. 0+780), Amulung, Cagayan (Downstream)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"AMULUNG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"E.V. INTERIOR CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-13","lat":17.825525,"lon":121.723289,"sm":54,"fm":54,"tm":54,"am":54,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.13,"wp":[17.82547,121.7221],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4417},{"i":5817,"cid":"22DH0072","pid":"P00621293LZ","t":"Bank Improvement along Inawasan River, Famy, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"FAMY (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96499444.57,"abc":96500000.0,"fy":"2022","sd":"09/09/2022","cd":"2023-11-06","lat":14.448611,"lon":121.449444,"sm":555,"fm":555,"tm":555,"am":555,"md":0.0,"ls":"inside","ww":"Inawasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4418},{"i":5818,"cid":"22BF0001","pid":"P00631117LZ","t":"Construction of Siffu River Flood Control Structure (San Placido Section Phase II), Brgy. San Placido, Roxas, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":41674688.35,"abc":42140000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-01-03","lat":17.14162,"lon":121.5771,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":4.05,"wp":[17.13098,121.61355],"wst":"matched","br":"San Placido","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.55,"value":4.05,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 4.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":382},{"i":5819,"cid":"23BH0084","pid":"P00736611LZ","t":"Construction of Dimalaude Flood Control Structure, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / JAY ARCIE CONSTRUCTION AND SUPPLY","c":48996784.15,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-06-15","lat":16.563493,"lon":122.269587,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4419},{"i":5820,"cid":"23BH0102","pid":"P00726876LZ","t":"Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-09-18","lat":16.538308,"lon":121.845148,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Minuri Flood Control Structure","len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4420},{"i":5821,"cid":"23BA0031","pid":"P00727342LZ","t":"Construction of Guardwall (along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road), Basco, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"BASCO (CAPITAL) (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":24112288.35,"abc":24142500.0,"fy":"2023","sd":"03/13/2023","cd":"2023-09-15","lat":20.349976,"lon":121.926156,"sm":173,"fm":173,"tm":173,"am":656,"md":8.94,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":8.94,"text":"The pin is 8.9 km outside Basco, Batanes, the nearest municipality the record claims. It falls in Ivana, Batanes.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":288},{"i":5822,"cid":"23GB0051","pid":"P00721974VS","t":"Construction of Flood Control Structure along Ypayo River at Tamayoc Bridge, Barangay Tamayoc, Patnongon, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"PATNONGON (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":43425000.0,"abc":43425000.0,"fy":"2023","sd":"03/30/2023","cd":"2024-01-30","lat":10.906654,"lon":122.009509,"sm":1115,"fm":1115,"tm":1115,"am":1115,"md":0.0,"ls":"inside","ww":"Ypayo","wn":"Ypayo River","wd":0.03,"wp":[10.90671,122.00979],"wst":"matched","br":"Tamayoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4421},{"i":5823,"cid":"24BF0051","pid":"P00845941LZ","t":"Construction of Flood Control Structure along Mallig River, Brgy. Rang-Ayan Section, Mallig, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"MALLIG (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":49475272.59,"abc":49500000.0,"fy":"2024","sd":"04/15/2024","cd":"2025-03-06","lat":17.177006,"lon":121.57758,"sm":902,"fm":902,"tm":902,"am":902,"md":0.0,"ls":"inside","ww":"Mallig","wn":"Mallig River","wd":0.11,"wp":[17.17704,121.57659],"wst":"matched","br":"Rang-Ayan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4422},{"i":5824,"cid":"22BD0089","pid":"P00621414LZ","t":"Cagayan River Flood Management Projects, Natappian, Solana, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SOLANA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":93002840.0,"abc":93002840.0,"fy":"2022","sd":"03/28/2022","cd":"2023-04-17","lat":17.681292,"lon":121.723289,"sm":1476,"fm":1476,"tm":1476,"am":1476,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.24,"wp":[17.67935,121.72425],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4423},{"i":5825,"cid":"23BH0077","pid":"P00736188LZ","t":"Construction of Dicamay1 Flood Control Structure Section 1 Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48998838.57,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-11-27","lat":16.603017,"lon":121.926419,"sm":673,"fm":673,"tm":null,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4424},{"i":5826,"cid":"22BH0060","pid":"P00620826LZ","t":"Construction of Flood Control along Ganano River at Batal (Sta. 1+300 - Sta. 1+787), Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":69479741.6,"abc":69480000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-10-05","lat":16.68589,"lon":121.5799,"sm":420,"fm":420,"tm":null,"am":420,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.03,"wp":[16.68603,121.58011],"wst":"matched","br":null,"len":487.0,"ph":null,"dup":[],"run":[5768,5810],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22BH0057 to 22BH0060) cover the same site, together worth PHP 211,110,626.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":445},{"i":5827,"cid":"23E00128","pid":"P00740417LZ","t":"Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":241248643.7,"abc":241249999.9,"fy":"2023","sd":"04/13/2023","cd":"2023-12-15","lat":13.328056,"lon":121.846111,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":"Libtangin","wn":"Libtangin River","wd":2.78,"wp":[13.35046,121.83446],"wst":"matched","br":"Mangiliol Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4425},{"i":5828,"cid":"22GB0013","pid":"P00620248VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Bongsod, Sibalom, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":1693418.13,"abc":52941830.0,"fy":"2022","sd":"02/18/2022","cd":"2022-09-26","lat":10.799321,"lon":122.009516,"sm":1443,"fm":1443,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.13,"wp":[10.80042,122.00996],"wst":"matched","br":"Bongsod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4426},{"i":5829,"cid":"23BH0083","pid":"P00736610LZ","t":"Construction of Didekkel Creek Flood control Structure, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-09-18","lat":16.530181,"lon":122.269689,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":"Didekkel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4427},{"i":5830,"cid":"23BD0019","pid":"P00727100LZ","t":"Cagayan River Flood Management Project, Andarayan, Solana, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SOLANA (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-07-17","lat":17.681803,"lon":121.724086,"sm":1476,"fm":1476,"tm":1476,"am":1476,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.25,"wp":[17.67974,121.72511],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4428},{"i":5831,"cid":"22BE0005","pid":"P00620494LZ","t":"Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+780, Brgy. Caligayan (Site I), Tumauini, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"TUMAUINI (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":39156940.0,"abc":39200000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-09-20","lat":17.271667,"lon":121.9275,"sm":1606,"fm":1606,"tm":1606,"am":1606,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caligayan","len":780.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4429},{"i":5832,"cid":"24DH0011","pid":"P00820359LZ","t":"Construction of River Control along Pagsanjan River, Lumban Section, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / JOBEL ENTERPRISES","c":77887135.0,"abc":77889010.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-18","lat":14.318962,"lon":121.449713,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4430},{"i":5833,"cid":"23BF0003","pid":"P00726425LZ","t":"Construction of Siffu River Flood Control Project (San Placido Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay San Placido, Roxas, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ROXAS (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"SIFFU ROCKS CONSTRUCTION / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":48246114.85,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-08-24","lat":17.138207,"lon":121.5806,"sm":1222,"fm":1222,"tm":1222,"am":1222,"md":0.0,"ls":"inside","ww":"Siffu","wn":"Siffu River","wd":3.6,"wp":[17.13098,121.61355],"wst":"matched","br":"San Placido","len":400.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.6,"text":"The title names Siffu, which OpenStreetMap maps through the stated municipality, but the pin is 3.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":366},{"i":5834,"cid":"24BH0276","pid":"P00843260LZ","t":"Construction of Flood Control and Drainage Structure Section 2, Barangay Palawan, San Guillermo, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN GUILLERMO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":87802963.92,"abc":87815000.0,"fy":"2024","sd":"07/05/2024","cd":"2024-11-30","lat":16.706362,"lon":121.84658,"sm":1282,"fm":1282,"tm":1282,"am":1282,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palawan","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4431},{"i":5835,"cid":"22EH0063","pid":"P00637087LZ","t":"Construction of Lunas Flood Mitigating Structure (Downstream), Romblon, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ROMBLON (CAPITAL) (ROMBLON)","deo":"Romblon District Engineering Office","co":"EMQ DESIGN & CONSTRUCTION","c":24497433.72,"abc":24499999.5,"fy":"2022","sd":"04/12/2022","cd":"2022-10-12","lat":12.496111,"lon":122.271389,"sm":1213,"fm":1213,"tm":1213,"am":1213,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4432},{"i":5836,"cid":"22BH0107","pid":"P00639337LZ","t":"Rehabilitation of Annafunan Flood Control Project,  Sta. 0 + 000 - Sta. 0 + 420, Annafunan, Echague, Isabela","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-12-15","lat":16.708189,"lon":121.724162,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":420.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4433},{"i":5837,"cid":"24GA0019","pid":"P00820146VS","t":"Construction of Malay CIS Bank Protection, Malay, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"MALAY (AKLAN)","deo":"Aklan District Engineering Office","co":"J.C. TAMAYO ENTERPRISES","c":19917934.53,"abc":19926340.0,"fy":"2024","sd":"02/06/2024","cd":"2024-06-10","lat":11.896441,"lon":121.928504,"sm":893,"fm":893,"tm":893,"am":893,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4434},{"i":5838,"cid":"23DH0034","pid":"P00742433LZ","t":"Rehabilitation of Bank along Pagsanjan River, Wawa, Lumban, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":95071125.53,"abc":96525000.0,"fy":"2023","sd":"03/25/2023","cd":"2024-03-08","lat":14.316202,"lon":121.450564,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4435},{"i":5839,"cid":"22BH0108","pid":"P00621473LZ","t":"Construction of Flood Control along Ganano River, Sta.1 + 787 - Sta.2 + 250, Batal, Santiago City, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CITY OF SANTIAGO (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":72374738.52,"abc":72375000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-09","lat":16.68617,"lon":121.5852,"sm":420,"fm":420,"tm":420,"am":420,"md":0.0,"ls":"inside","ww":"Ganano","wn":"Ganano River","wd":0.02,"wp":[16.68604,121.58512],"wst":"matched","br":null,"len":463.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4436},{"i":5840,"cid":"22EH0035","pid":"P00621491LZ","t":"Construction of Bulwang-Gabawan Fllod Control Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"R N V CONSTRUCTION","c":24499247.05,"abc":24499999.5,"fy":"2022","sd":"04/12/2022","cd":"2022-12-06","lat":12.4225,"lon":122.01,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":540},{"i":5841,"cid":"23BH0203","pid":"P00740319LZ","t":"Construction of Flood Control Structure, Barangay Digumased, Section 1, Dinapigue, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"DINAPIGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"07/07/2023","cd":"2023-12-08","lat":16.573208,"lon":122.271701,"sm":513,"fm":513,"tm":513,"am":513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Digumased","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4437},{"i":5842,"cid":"22BB0017","pid":"P00621026LZ","t":"Construction of Flood Control System, Pared River Basin, Brgy. San Miguel, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"ARCI CONSTRUCTION","c":12771183.6,"abc":19600000.0,"fy":"2022","sd":"02/02/2022","cd":"2024-09-30","lat":17.838821,"lon":121.928748,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":"Pared","wn":"Pared River","wd":8.94,"wp":[17.89796,121.87133],"wst":"matched","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":8.94,"text":"The title names Pared, which OpenStreetMap maps through the stated municipality, but the pin is 8.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":367},{"i":5843,"cid":"24BG0066","pid":"P00824873LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"GAMU (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONSTRUCTION SERVICES","c":144724653.2,"abc":144749998.7,"fy":"2024","sd":"03/27/2024","cd":"2024-08-23","lat":17.052719,"lon":121.848517,"sm":563,"fm":563,"tm":563,"am":563,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.23,"wp":[17.05311,121.85062],"wst":"matched","br":"District 2","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4438},{"i":5844,"cid":"21BD0064","pid":"P00525557LZ","t":"Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Tuguegarao City","deo":"Cagayan 3rd District Engineering Office","co":"RPF CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":59132762.6,"abc":59729640.0,"fy":"2021","sd":"11/22/2021","cd":"2023-03-31","lat":17.6273,"lon":121.7247,"sm":1603,"fm":null,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Caritan-Balzain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4439},{"i":5845,"cid":"23DH0035","pid":"P00742434LZ","t":"Rehabilitation of Bank along Pagsanjan River, Lumban Section, Lumban, Laguna","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":89099964.33,"abc":89100000.0,"fy":"2023","sd":"03/25/2023","cd":"2024-02-22","lat":14.315309,"lon":121.451039,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4440},{"i":5846,"cid":"23BC0077","pid":"P00727347LZ","t":"Construction of Bank Protection along Chico River, Tammuco, Sto. Niño, Cagayan ( Package V)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTO NIÑO (FAIRE) (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"JDL5 CONSTRUCTION CORPORATION (FORMERLY: DEOJ CONSTRUCTION)","c":24105830.87,"abc":24500000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-11-03","lat":17.928417,"lon":121.590429,"sm":1412,"fm":1412,"tm":1412,"am":1412,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.2,"wp":[17.92664,121.59047],"wst":"matched","br":null,"len":null,"ph":"Package V","dup":[],"run":[5988,5964],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BC0077 to 23BC0079) cover the same site, together worth PHP 82,170,831.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":651},{"i":5847,"cid":"22GF0067","pid":"P00620083VS","t":"Construction of Calampitao River Flood Control Project, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":4851128.23,"abc":4900000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-08-16","lat":10.660302,"lon":122.279168,"sm":599,"fm":599,"tm":599,"am":971,"md":0.01,"ls":"boundary","ww":"Calampitao","wn":"Calampitao River","wd":0.0,"wp":[10.66031,122.27916],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4441},{"i":5848,"cid":"24EA0036","pid":"P00821364LZ","t":"Construction of Flood Control Structure Along Tipo River, Buenavista, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"GUIMARAS","mu":"BUENAVISTA (GUIMARAS)","deo":"Marinduque District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96495777.91,"abc":96498000.0,"fy":"2024","sd":"02/19/2024","cd":"2025-03-24","lat":13.266521,"lon":121.928759,"sm":241,"fm":238,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":"Tipo","wn":"Tipo River","wd":0.03,"wp":[13.2665,121.92902],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":288.94,"text":"The record contradicts itself: the title and the pin point to Buenavista, Marinduque, but the municipality field names Buenavista, Guimaras, 289 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":460},{"i":5849,"cid":"23EH0083","pid":"P00727197LZ","t":"Construction of Flood Mitigating Structures along Gabawan Dam Site, Gabawan Odiongan","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"R N V CONSTRUCTION","c":48993414.82,"abc":48999999.52,"fy":"2023","sd":"03/24/2023","cd":"2023-09-13","lat":12.423611,"lon":122.01,"sm":1034,"fm":1034,"tm":null,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":479},{"i":5850,"cid":"22BG0014","pid":"P00621059LZ","t":"Construction of Magat River Flood Control Project (Phase I), Brgy. Marasat Pequeño, San Mateo, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MATEO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"D.A. CADELIÑA CONSTRUCTION / GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":28953495.34,"abc":29399999.28,"fy":"2022","sd":"03/28/2022","cd":"2022-10-14","lat":16.903031,"lon":121.592517,"sm":1328,"fm":1328,"tm":1328,"am":1328,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":1.77,"wp":[16.91106,121.57818],"wst":"matched","br":"Marasat Pequeño","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4442},{"i":5851,"cid":"23DH0018","pid":"P00726565LZ","t":"Construction of River Control along Pagsanjan River, Barangay Wawa, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":96499790.33,"abc":96500000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-12-15","lat":14.313213,"lon":121.452166,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Wawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4443},{"i":5852,"cid":"22BD0092","pid":"P00620813LZ","t":"Cagayan River Flood Management Projects, Minanga Sur (Sta. 0+000 - Sta. 0+250), Iguig, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"IGUIG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"VIKING CONSTRUCTION & SUPPLIES","c":76374847.58,"abc":77200000.0,"fy":"2022","sd":"03/28/2022","cd":"2024-03-27","lat":17.764083,"lon":121.725372,"sm":631,"fm":631,"tm":631,"am":631,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.16,"wp":[17.76304,121.72435],"wst":"matched","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4444},{"i":5853,"cid":"22EA0237","pid":"P00639512LZ","t":"Construction of Flood Control Structure at Brgy. Tapuyan, Gasan, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"GASAN (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEDIDIAH CONSTRUCTION","c":9700095.72,"abc":9797999.99,"fy":"2022","sd":"03/30/2022","cd":"2022-10-08","lat":13.364,"lon":121.8489,"sm":568,"fm":568,"tm":568,"am":568,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tapuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4445},{"i":5854,"cid":"24BB0088","pid":"P00823335LZ","t":"Construction of Flood Control, San Miguel, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48233879.64,"abc":48250000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-07-15","lat":17.838552,"lon":121.928903,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4446},{"i":5855,"cid":"22BF0059","pid":"P00620144LZ","t":"Construction of Flood Control (Phase II), Brgy. Eden, San Manuel, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MANUEL (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) / JWU CONSTRUCTION AND SUPPLY","c":73830813.63,"abc":73867855.0,"fy":"2022","sd":"04/04/2022","cd":"2023-03-21","lat":17.03318,"lon":121.5934,"sm":1324,"fm":1324,"tm":1324,"am":1324,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Eden","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4447},{"i":5856,"cid":"24BH0220","pid":"P00843243LZ","t":"Construction of Diarao Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96484520.0,"abc":96500000.0,"fy":"2024","sd":"06/10/2024","cd":"2024-12-04","lat":16.572246,"lon":121.725586,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4448},{"i":5857,"cid":"24DH0033","pid":"P00823376LZ","t":"Construction of River Control along Balanac River, Brgy Maulawin, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"11-16 CONSTRUCTION","c":93594921.19,"abc":96500000.0,"fy":"2024","sd":"03/15/2024","cd":"2025-02-28","lat":14.272002,"lon":121.452616,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":"Balanac","wn":"Balanac River","wd":0.04,"wp":[14.27166,121.45268],"wst":"matched","br":"Maulawin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4449},{"i":5858,"cid":"22EA0056","pid":"P00620899LZ","t":"Construction of Flood Control Structure along Boac River, Sta. 0+000 - Sta. 0+670, Brgy. Sawi, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":86543354.23,"abc":86848000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-12-21","lat":13.4429,"lon":121.8501,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.04,"wp":[13.443,121.84975],"wst":"matched","br":"Sawi","len":670.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4450},{"i":5859,"cid":"22GF0119","pid":"P00632997VS","t":"Construction of Igbaras River Control, Igbaras, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"IGBARAS (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"TOPMOST DEVELOPMENT & MKTG. CORP.","c":29106048.36,"abc":29400000.0,"fy":"2022","sd":"06/01/2022","cd":"2023-02-13","lat":10.722271,"lon":122.281039,"sm":630,"fm":630,"tm":630,"am":630,"md":0.0,"ls":"inside","ww":"Igbaras","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4451},{"i":5860,"cid":"23BB0021","pid":"P00726112LZ","t":"Construction of Flood Control at San Miguel, Baggao, Cagayan","w":"Construction of Revetment","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"CMG JR. BUILDERS","c":48999760.64,"abc":49000000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-07-23","lat":17.838572,"lon":121.928914,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4452},{"i":5861,"cid":"24DL0018","pid":"P00820916LZ","t":"Construction of Flood Control Structure along Boong River, Barangays Villa Victoria and Bacong, Alabat, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ALABAT (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":4827143.98,"abc":4900000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-08-08","lat":14.111486,"lon":122.010042,"sm":17,"fm":17,"tm":17,"am":17,"md":0.0,"ls":"inside","ww":"Boong","wn":"Boong River","wd":0.06,"wp":[14.11203,122.01008],"wst":"matched","br":"Villa Victoria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4453},{"i":5862,"cid":"21BC0086","pid":"P00561665LZ","t":"Construction of Box Culvert, Barangay Namuccayan, Sto. Nino, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Santo Niño","deo":"Cagayan 2nd District Engineering Office","co":"JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION)","c":4848606.56,"abc":4950000.0,"fy":"2021","sd":"03/24/2021","cd":"2022-12-02","lat":17.927222,"lon":121.594806,"sm":1412,"fm":null,"tm":1412,"am":1412,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Namuccayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4454},{"i":5863,"cid":"23DH0014","pid":"P00726566LZ","t":"Construction of River Control along Pagsanjan River, Lumban Section","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / JOBEL ENTERPRISES","c":93567192.5,"abc":96500000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-08-22","lat":14.312242,"lon":121.452769,"sm":825,"fm":825,"tm":null,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4455},{"i":5864,"cid":"24BD0063","pid":"P00824861LZ","t":"Construction of Cagayan River Flood Management Project Anquiray (Downstream), Amulung, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"AMULUNG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) / VHT CAGAYAN BUILDERS CORPORATION","c":67550000.0,"abc":67550000.0,"fy":"2024","sd":"05/09/2024","cd":"2024-11-30","lat":17.821544,"lon":121.725678,"sm":54,"fm":54,"tm":54,"am":54,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.38,"wp":[17.82185,121.72214],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4456},{"i":5865,"cid":"22DL0146","pid":"P00621101LZ","t":"Construction of Flood Control and Drainage Structure along Pandanan River, Calauag, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CALAUAG (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"ARDA CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-09-27","lat":13.922353,"lon":122.287749,"sm":301,"fm":301,"tm":301,"am":301,"md":0.0,"ls":"inside","ww":"Pandanan","wn":"Pandanan River","wd":0.02,"wp":[13.92249,122.28775],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4457},{"i":5866,"cid":"24BE0097","pid":"P00824870LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, barangay Arusip, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":96492518.4,"abc":96500000.0,"fy":"2024","sd":"05/29/2024","cd":"2024-10-15","lat":17.1044,"lon":121.85041,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.16,"wp":[17.10408,121.85185],"wst":"matched","br":"Arusip","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4458},{"i":5867,"cid":"23EA0026","pid":"P00725868LZ","t":"Construction of Caigangan Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 675, Buenavista, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"J.D. LEGASPI CONSTRUCTION / ZUIDEN BUILDERS INC.","c":72367731.57,"abc":72373000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-11-28","lat":13.260907,"lon":121.929038,"sm":241,"fm":241,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":675.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4459},{"i":5868,"cid":"24DL0015","pid":"P00820909LZ","t":"Construction of Breakwater, Alabat, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ALABAT (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":19599888.56,"abc":19600000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-06","lat":14.096,"lon":122.010656,"sm":17,"fm":17,"tm":17,"am":17,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4460},{"i":5869,"cid":"22DJ0148","pid":"P00637798LZ","t":"Construction of Box Culvert, Brgy. Domoit, Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-10-16","lat":13.96691,"lon":121.59529,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Domoit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4461},{"i":5870,"cid":"24BH0150","pid":"P00843225LZ","t":"Construction of Napaliong Flood control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96399715.44,"abc":96500000.0,"fy":"2024","sd":"05/21/2024","cd":"2024-11-16","lat":16.536215,"lon":121.851366,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4462},{"i":5871,"cid":"22EA0140","pid":"P00621429LZ","t":"Construction of Flood Control Structure along Tipo River (Package 1), Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96497681.88,"abc":96498000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-08-02","lat":13.2641,"lon":121.9306,"sm":241,"fm":241,"tm":null,"am":241,"md":0.0,"ls":"inside","ww":"Tipo","wn":"Tipo River","wd":0.07,"wp":[13.26367,121.93009],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4463},{"i":5872,"cid":"22EI0076","pid":"P00632941LZ","t":"Construction of Slope Protection with Drainage at Balugo National High School, Mansalay, Oriental Mindoro","w":"Construction of Drainage Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"AIDFELART CONST. CORP.","c":9899907.62,"abc":9899922.98,"fy":"2022","sd":"02/21/2022","cd":"2022-08-14","lat":12.578056,"lon":121.454444,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4464},{"i":5873,"cid":"23BD0020","pid":"P00726121LZ","t":"Construction of Drainage System along Caritan- Balzain Creek Phase IV, Caritan, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"RPF CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2024-02-05","lat":17.624442,"lon":121.725783,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Caritan-Balzain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4465},{"i":5874,"cid":"22EA0055","pid":"P00620269LZ","t":"Construction of Sawi Flood Control, Sta. 0+000 - Sta. 0+680, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":86848824.12,"abc":86848000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-28","lat":13.4375,"lon":121.8517,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":680.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4466},{"i":5875,"cid":"21GA0205","pid":"P00521758VS","t":"Construction of Revetment Wall along Aklan River, Brgy. Rivera, Libacao, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"Libacao","deo":"Aklan District Engineering Office","co":"PATRILA BUILDERS, INC.","c":59402499.64,"abc":60325860.0,"fy":"2021","sd":"10/15/2021","cd":"2022-07-27","lat":11.402949,"lon":122.289166,"sm":776,"fm":null,"tm":776,"am":776,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.0,"wp":[11.40296,122.28917],"wst":"matched","br":"Rivera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4467},{"i":5876,"cid":"21J00056","pid":"P00522047MN","t":"Construction of Revetment, Kumalarang River, Isabela City","w":"Construction of Revetment","rg":"Region IX","pv":"BASILAN","mu":null,"deo":"Isabela City District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / HHH DEVELOPER AND CONSTRUCTION","c":144207784.9,"abc":144557364.9,"fy":"2021","sd":"06/25/2021","cd":"2022-09-15","lat":6.619131,"lon":121.93379,"sm":null,"fm":null,"tm":null,"am":390,"md":null,"ls":"unknown","ww":"Kumalarang","wn":"Kumalarang River","wd":0.03,"wp":[6.61902,121.93401],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":140},{"i":5877,"cid":"23BE0038","pid":"P00726688LZ","t":"Construction of Flood Control Project along Abuan River, barangay Cabisera 10, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY","c":48994145.8,"abc":49000000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-06-15","lat":17.0778,"lon":122.0113,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Abuan","wn":"Abuan River","wd":0.49,"wp":[17.08208,122.01237],"wst":"matched","br":"Cabisera 10","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4468},{"i":5878,"cid":"22BG0068","pid":"P00631126LZ","t":"Construction of Flood Control Structure along the bank of Magat River, Marasat Pequeño, San Mateo, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MATEO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"D.A. CADELIÑA CONSTRUCTION / GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":41512797.12,"abc":42139998.39,"fy":"2022","sd":"05/31/2022","cd":"2023-03-28","lat":16.931908,"lon":121.595631,"sm":1328,"fm":1328,"tm":1328,"am":1328,"md":0.0,"ls":"inside","ww":"Magat","wn":"Magat River","wd":0.09,"wp":[16.93125,121.5962],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4469},{"i":5879,"cid":"23DL0083","pid":"P00727170LZ","t":"Construction of Breakwater Alabat, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"ALABAT (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RAM BUILDERS","c":24496456.69,"abc":24500000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-10-09","lat":14.096348,"lon":122.011369,"sm":17,"fm":17,"tm":1188,"am":17,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":5.8,"text":"The record contradicts itself: the municipality field and the pin point to Alabat, Quezon, but the title names Quezon, Quezon, 6 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":589},{"i":5880,"cid":"24PJ0017","pid":"P00820744LZ","t":"Construction of Mapacopaco Flood Control, Sta. 38+850 - Sta. 39+900 (R/S), Posnaan, Aguinaldo, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"AGUINALDO (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"MA CONSTRUCTION / R.S. SEPIAN CONSTRUCTION & TRUCKING","c":98000000.0,"abc":96479015.97,"fy":"2024","sd":"02/16/2024","cd":"2024-05-27","lat":16.9293,"lon":121.454511,"sm":12,"fm":12,"tm":12,"am":12,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1050.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01576,"text":"Contract cost is 1.58% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":567},{"i":5881,"cid":"21BD0068","pid":"P00526392LZ","t":"Construction of Drainage System along Caritan-Balzain Creek, Package 2, Caritan, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Tuguegarao City","deo":"Cagayan 3rd District Engineering Office","co":"RPF CONSTRUCTION","c":14258479.57,"abc":14700000.0,"fy":"2021","sd":"11/11/2021","cd":"2023-03-19","lat":17.625,"lon":121.7261,"sm":1603,"fm":null,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Caritan-Balzain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4470},{"i":5882,"cid":"22BH0118","pid":"P00631135LZ","t":"Construction of Brgy. Minuri Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 915, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":44099988.47,"abc":44100000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-09-22","lat":16.53725,"lon":121.85268,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Minuri Flood Control Structure","len":515.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4471},{"i":5883,"cid":"23GF0071","pid":"P00721646VS","t":"Construction of Tangyan River Control Project, Barangay Nito-an, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"ABRIGHT BUILDERS CORPORATION","c":29091213.14,"abc":29400000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-12-19","lat":10.695207,"lon":122.289838,"sm":599,"fm":599,"tm":599,"am":630,"md":0.05,"ls":"boundary","ww":"Tangyan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nito-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4472},{"i":5884,"cid":"22JA0004","pid":"P00631081MN","t":"Construction of Flood Control at Saaz River, San Ramon, Zamboanga City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"JM2K CONSTRUCTION","c":49482639.74,"abc":49000000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-03-25","lat":7.003611,"lon":121.93556,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":"Saaz","wn":"Saaz River","wd":0.0,"wp":[7.00361,121.93555],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00985,"text":"Contract cost is 0.98% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":775},{"i":5885,"cid":"23BG0096","pid":"P00726695LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Old San Mariano, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":46256541.75,"abc":46266891.44,"fy":"2023","sd":"04/11/2023","cd":"2023-08-22","lat":16.995043,"lon":122.011641,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Old San Mariano","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4473},{"i":5886,"cid":"23BD0011","pid":"P00726120LZ","t":"Construction of Drainage along Bagay Road, Phase IV, Tuguegarao City, Cagayan","w":"Construction of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2024-02-19","lat":17.604992,"lon":121.726125,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4474},{"i":5887,"cid":"24DH0040","pid":"P00844545LZ","t":"Construction of Flood Control Structure along Romelo River, Siniloan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SINILOAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"POWER K CONSTRUCTION SUPPLY & SERVICES","c":96499568.47,"abc":96500000.0,"fy":"2024","sd":"03/22/2024","cd":"2025-03-07","lat":14.43,"lon":121.45583,"sm":1462,"fm":1462,"tm":1462,"am":1462,"md":0.0,"ls":"inside","ww":"Romelo","wn":"Romelo River","wd":1.61,"wp":[14.44409,121.45939],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":394},{"i":5888,"cid":"24BA0017","pid":"P00820778LZ","t":"Construction of Uyugan Flood Control (Valugan Section) Phase 2, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":9784961.17,"abc":9800000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-08-26","lat":20.353372,"lon":121.937594,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4475},{"i":5889,"cid":"24BF0044","pid":"P00824894LZ","t":"Construction of Slope Protection Structure for Cagayan River Basin, Magat River, Aplat Section, Package 2, Aurora, Isabela","w":"Construction of Slope Protection Structure","rg":"Region II","pv":"ISABELA","mu":"AURORA (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":144740047.4,"abc":144750000.0,"fy":"2024","sd":"07/17/2024","cd":"2025-03-21","lat":16.952939,"lon":121.601353,"sm":83,"fm":83,"tm":83,"am":83,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":18.97,"wp":[16.95796,121.77938],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4476},{"i":5890,"cid":"23DL0097","pid":"P00727314LZ","t":"Rehabilitation of Flood Control along Pandanan River, Sta. 008 + 971 - Sta. 009 + 141 RS, Package A, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":87815000.0,"abc":87815000.0,"fy":"2023","sd":"03/24/2023","cd":"2024-02-16","lat":13.914836,"lon":122.291558,"sm":809,"fm":809,"tm":809,"am":301,"md":0.24,"ls":"boundary","ww":"Pandanan","wn":"Pandanan River","wd":0.0,"wp":[13.91486,122.29158],"wst":"matched","br":null,"len":170.0,"ph":"Package A","dup":[],"run":[5918,5912],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DL0097 to 23DL0099) cover the same site, together worth PHP 218,765,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":366},{"i":5891,"cid":"23BE0035","pid":"P00726676LZ","t":"Construction of Flood Mitigation Structure along Cagayan River, Barangay Alibagu, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48975104.35,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-11-24","lat":17.1016,"lon":121.8528,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.16,"wp":[17.10193,121.85132],"wst":"matched","br":"Alibagu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4477},{"i":5892,"cid":"24EH0098","pid":"P00823586LZ","t":"Construction of Panique Flood Control along Panique Br. I, Panique, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SCATR CONSTRUCTION","c":96497440.82,"abc":96499999.43,"fy":"2024","sd":"03/19/2024","cd":"2024-09-17","lat":12.4742,"lon":122.0119,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4478},{"i":5893,"cid":"22DH0004","pid":"P00620886LZ","t":"Construction of River Control along Pagsanjan River, Brgy. Wawa, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":83514566.55,"abc":86149410.0,"fy":"2022","sd":"02/19/2022","cd":"2022-11-14","lat":14.3075,"lon":121.456111,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Wawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4479},{"i":5894,"cid":"23DJ0016","pid":"P00726567LZ","t":"Construction of Iyam River Flood Control (Package 1), Lucena City, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LUCENA CITY (CAPITAL) (QUEZON)","deo":"Quezon 2nd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":57899998.23,"abc":57900000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-08-14","lat":13.96314,"lon":121.6032,"sm":819,"fm":819,"tm":819,"am":819,"md":0.0,"ls":"inside","ww":"Iyam","wn":"Iyam River","wd":0.01,"wp":[13.96308,121.60316],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4480},{"i":5895,"cid":"22BH0055","pid":"P00631132LZ","t":"Construction of Annafunan Flood Control Project, Annafunan, Echague, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ECHAGUE (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MA TESORO CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":45077651.65,"abc":45080000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-07-31","lat":16.714185,"lon":121.727094,"sm":545,"fm":545,"tm":545,"am":545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4481},{"i":5896,"cid":"24BE0016","pid":"P00821194LZ","t":"Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":139905104.4,"abc":139925000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-12-15","lat":17.10558,"lon":121.85374,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.15,"wp":[17.10595,121.8524],"wst":"matched","br":"Alibagu","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4482},{"i":5897,"cid":"22DL0022","pid":"P00620618LZ","t":"Construction of Seawall, Barangay Pinagtalleran, Calauag, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CALAUAG (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"TG SURCON BUILDERS INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-14","lat":13.960411,"lon":122.292131,"sm":301,"fm":301,"tm":301,"am":301,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagtalleran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4483},{"i":5898,"cid":"22BG0082","pid":"P00621061LZ","t":"Construction of Pinacanauan River Flood Control Project, Brgy. Bitabian, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":28958609.7,"abc":29399995.92,"fy":"2022","sd":"03/28/2022","cd":"2022-10-09","lat":16.956206,"lon":122.01225,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bitabian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4484},{"i":5899,"cid":"22DH0005","pid":"P00620887LZ","t":"Construction of River Control along Pagsanjan River, Lumban Section, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"SANTA CRUZ (CAPITAL) (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":85884929.73,"abc":85885000.0,"fy":"2022","sd":"02/19/2022","cd":"2022-11-14","lat":14.305833,"lon":121.456111,"sm":825,"fm":1376,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.23,"text":"The record contradicts itself: the title and the pin point to Lumban, Laguna, but the municipality field names Santa Cruz, Laguna, 3 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":480},{"i":5900,"cid":"23BA0008","pid":"P00737439LZ","t":"Construction of Retaining Wall (Hillside) along Cabugao Road at Barangay Kayuganan, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"SWIFT DEVELOPMENT AND SUPPLIES CORP.","c":4095167.51,"abc":4874464.0,"fy":"2023","sd":"02/21/2023","cd":"2023-09-20","lat":20.350627,"lon":121.937638,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kayuganan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4485},{"i":5901,"cid":"23BG0094","pid":"P00726693LZ","t":"Construction of Pinacanauan River Flood Control Project, barangay Cataguing, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"YZK BUILDERS","c":43801383.68,"abc":43811506.43,"fy":"2023","sd":"04/11/2023","cd":"2023-08-15","lat":16.985058,"lon":122.012697,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":"Pinacanauan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cataguing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4486},{"i":5902,"cid":"21BD0076","pid":"P00526391LZ","t":"Construction of Drainage System Outfall - Balzain Creek to Pinacanauan River - Package 1, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"Tuguegarao City","deo":"Cagayan 3rd District Engineering Office","co":"ASC CONSTRUCTION & CONCRETE PRODUCTS","c":41495798.75,"abc":49000000.0,"fy":"2021","sd":"11/11/2021","cd":"2022-12-13","lat":17.6179,"lon":121.7284,"sm":1603,"fm":null,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":"Balzain","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4487},{"i":5903,"cid":"24DL0113","pid":"P00820927LZ","t":"Construction of Seawall, Barangay Pinagtalleran, Calauag, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CALAUAG (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":4833252.63,"abc":4900000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-07-12","lat":13.960425,"lon":122.2929,"sm":301,"fm":301,"tm":301,"am":301,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagtalleran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4488},{"i":5904,"cid":"24BA0011","pid":"P00820768LZ","t":"Construction of Barangay Kayuganan Seawall, Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"J.F. GABOTERO, INC.","c":9780073.63,"abc":9800000.0,"fy":"2024","sd":"03/26/2024","cd":"2024-07-26","lat":20.348957,"lon":121.938,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kayuganan Seawall","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4489},{"i":5905,"cid":"23BG0132","pid":"P00742306LZ","t":"Construction of Drainage Canal, Barangay Zone 3, San Mariano, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN MARIANO (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":4900426.44,"abc":4949989.92,"fy":"2023","sd":"05/17/2023","cd":"2023-11-19","lat":16.98614,"lon":122.013063,"sm":1327,"fm":1327,"tm":1327,"am":1327,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4490},{"i":5906,"cid":"24EA0031","pid":"P00820405LZ","t":"Construction of Poctoy Flood Control, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BOAC (CAPITAL) (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS)","c":67545243.0,"abc":67548000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-10-28","lat":13.433792,"lon":121.856626,"sm":214,"fm":214,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4491},{"i":5907,"cid":"23EH0058","pid":"P00726278LZ","t":"Construction of Calunacon Flood Control Structure along Tablas Circumferential Road (Phase 3), San Andres, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN ANDRES (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":48996131.97,"abc":48999999.5,"fy":"2023","sd":"02/21/2023","cd":"2023-08-21","lat":12.54194,"lon":122.01361,"sm":1255,"fm":1255,"tm":1255,"am":1255,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4492},{"i":5908,"cid":"24BG0181","pid":"P00824862LZ","t":"Construction of Flood Control Structure along Cagayan River, Barangay Calaccab, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION / ALGO CONSTRUCTION AND POWER DEVELOPMENT, INC.","c":77163172.6,"abc":77199985.11,"fy":"2024","sd":"07/17/2024","cd":"2025-03-25","lat":16.717258,"lon":121.728525,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.16,"wp":[16.71672,121.72713],"wst":"matched","br":"Calaccab","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4493},{"i":5909,"cid":"22DH0003","pid":"P00620885LZ","t":"Construction of River Control along Pagsanjan River, Brgy. Magdapio, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / JOBEL ENTERPRISES","c":83249659.5,"abc":85885000.0,"fy":"2022","sd":"02/19/2022","cd":"2023-06-05","lat":14.273611,"lon":121.4575,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magdapio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4494},{"i":5910,"cid":"24BB0086","pid":"P00823337LZ","t":"Construction of Flood Control, Zone 1, Barangay San Jose, Baggao, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BAGGAO (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"TJMT CONSTRUCTION","c":48244212.26,"abc":48250000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-01","lat":17.89472,"lon":121.857778,"sm":108,"fm":108,"tm":108,"am":108,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4495},{"i":5911,"cid":"24EH0065","pid":"P00823582LZ","t":"Construction of Gabawan River Control along Bulwang-Upstream(B/S) Phase 3, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139924999.6,"fy":"2024","sd":"03/13/2024","cd":"2024-09-23","lat":12.41638,"lon":122.01388,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":"Gabawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4496},{"i":5912,"cid":"23DL0099","pid":"P00727373LZ","t":"Rehabilitation of Flood Control along Pandanan River, Sta. 009 + 306 - Sta. 009 + 381 RS, Package C, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-12-03","lat":13.915003,"lon":122.293108,"sm":809,"fm":809,"tm":809,"am":301,"md":0.4,"ls":"boundary","ww":"Pandanan","wn":"Pandanan River","wd":0.0,"wp":[13.91502,122.29311],"wst":"matched","br":null,"len":75.0,"ph":"Package C","dup":[],"run":[5890,5918],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DL0097 to 23DL0099) cover the same site, together worth PHP 218,765,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":589},{"i":5913,"cid":"23BA0002","pid":"P00726107LZ","t":"Construction of Uyugan Flood Control (Valugan Section), Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"REMAR CONSTRUCTION","c":9738048.0,"abc":9738048.0,"fy":"2023","sd":"02/17/2023","cd":"2023-08-21","lat":20.35389,"lon":121.93801,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4497},{"i":5914,"cid":"24BG0020","pid":"P00821168LZ","t":"Construction of Cagayan River Flood Control Project, Brgy. Aniog, Angadanan, Isabela","w":"Construction of Revetment","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY / HIGH ROAD CONSTRUCTION SERVICES","c":96479997.58,"abc":96499995.31,"fy":"2024","sd":"06/19/2024","cd":"2024-08-06","lat":16.771389,"lon":121.728933,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":2.14,"wp":[16.7521,121.72725],"wst":"matched","br":"Aniog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4498},{"i":5915,"cid":"21DH0053","pid":"P00526321LZ","t":"Construction of River Control along Pagsanjan River, Lumban Section, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"Lumban","deo":"Laguna 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":93605396.83,"abc":96500474.32,"fy":"2021","sd":"04/05/2021","cd":"2022-08-29","lat":14.3029,"lon":121.458036,"sm":825,"fm":null,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4499},{"i":5916,"cid":"24BH0218","pid":"P00843252LZ","t":"Construction of Dumawing Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DALCON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-10-10","lat":16.499283,"lon":121.858318,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4500},{"i":5917,"cid":"24EH0064","pid":"P00821365LZ","t":"Construction of Gabawan River Control along Bulwang Upstream (B/S) Phase 2, Odiongan Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139924999.8,"fy":"2024","sd":"03/13/2024","cd":"2024-09-23","lat":12.4158,"lon":122.0142,"sm":1034,"fm":1034,"tm":null,"am":1034,"md":0.0,"ls":"inside","ww":"Gabawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4501},{"i":5918,"cid":"23DL0098","pid":"P00727315LZ","t":"Rehabilitation of Flood Control along Pandanan River, Sta. 009 + 141 - Sta. 009 + 306 RS, Package B, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)","c":86850000.0,"abc":86850000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-12-18","lat":13.916397,"lon":122.293486,"sm":809,"fm":809,"tm":809,"am":301,"md":0.46,"ls":"boundary","ww":"Pandanan","wn":"Pandanan River","wd":0.0,"wp":[13.9164,122.29345],"wst":"matched","br":null,"len":165.0,"ph":"Package B","dup":[],"run":[5890,5912],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DL0097 to 23DL0099) cover the same site, together worth PHP 218,765,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":367},{"i":5919,"cid":"23BA0007","pid":"P00726108LZ","t":"Construction of Uyugan Flood Control (Dichod Section), Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":"UYUGAN (BATANES)","deo":"Batanes District Engineering Office","co":"REMAR CONSTRUCTION","c":2897777.75,"abc":2904804.0,"fy":"2023","sd":"02/17/2023","cd":"2023-05-06","lat":20.352914,"lon":121.938057,"sm":1619,"fm":1619,"tm":1619,"am":1619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4502},{"i":5920,"cid":"21EI0127","pid":"P00526459LZ","t":"Construction of Bansud River Control, Poblacion Section, Bansud, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Bansud","deo":"Southern Mindoro District Engineering Office","co":"KING'S BUILDERS & DEVELOPMENT CORPORATION","c":19599958.93,"abc":19599804.46,"fy":"2021","sd":"04/08/2022","cd":"2022-10-17","lat":12.854722,"lon":121.458056,"sm":156,"fm":null,"tm":156,"am":156,"md":0.0,"ls":"inside","ww":"Bansud","wn":"Bansud","wd":0.01,"wp":[12.85465,121.45808],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4503},{"i":5921,"cid":"22EH0147","pid":"P00640564LZ","t":"Construction of Seawall in Brgy. Vicente, Concepcion, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"CONCEPCION (ROMBLON)","deo":"Romblon District Engineering Office","co":"SIM CONSTRUCTION, TRADING AND SERVICES","c":19799697.37,"abc":19799999.5,"fy":"2022","sd":"07/21/2022","cd":"2023-05-06","lat":12.916077,"lon":121.731634,"sm":451,"fm":451,"tm":451,"am":451,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Vicente","len":null,"ph":null,"dup":[5926,5931],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 59,088,584.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":845},{"i":5922,"cid":"23GB0022","pid":"P00721728VS","t":"Construction of Flood Control Structure along Sibalom River, District II, Sibalom, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-08-25","lat":10.79695,"lon":122.01486,"sm":1443,"fm":1443,"tm":1443,"am":1443,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom","wd":0.06,"wp":[10.79742,122.0151],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4504},{"i":5923,"cid":"23GA0031","pid":"P00721623VS","t":"Rehabilitation of Revetment Wall along Makato River (Makato Bypass Road), Barangay Poblacion, Makato, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"MALAY (AKLAN)","deo":"Aklan District Engineering Office","co":"EDISON C BUILDERS & CONSTRUCTION SUPPLY","c":29392615.8,"abc":29400000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-20","lat":11.71417,"lon":122.295939,"sm":884,"fm":893,"tm":884,"am":884,"md":0.0,"ls":"inside","ww":"Makato","wn":"Makato River","wd":0.01,"wp":[11.71419,122.29587],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":33.33,"text":"The record contradicts itself: the title and the pin point to Makato, Aklan, but the municipality field names Malay, Aklan, 33 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":590},{"i":5924,"cid":"22EA0022","pid":"P00632928LZ","t":"Construction of Villa Mendez Flood Control, Barangay Villa Mendez, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"T.N.G. CONSTRUCTION CORPORATION","c":9905612.11,"abc":9898000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-07-16","lat":13.4772,"lon":121.86,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Mendez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":566},{"i":5925,"cid":"23JA0068","pid":"P00734014MN","t":"Construction of Flood Mitigation Structure, Barangay Talisayan, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"DANSBURG MACRO-BUILDERS INC.","c":29399535.35,"abc":29400000.0,"fy":"2023","sd":"07/31/2023","cd":"2023-12-12","lat":6.97114,"lon":121.938135,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talisayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4505},{"i":5926,"cid":"22EH0148","pid":"P00640565LZ","t":"Construction of Seawall, Brgy. Calabasahan, Concepcion, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"CONCEPCION (ROMBLON)","deo":"Romblon District Engineering Office","co":"SIM CONSTRUCTION, TRADING AND SERVICES","c":19503220.7,"abc":19799999.5,"fy":"2022","sd":"07/21/2022","cd":"2023-05-06","lat":12.916077,"lon":121.731634,"sm":451,"fm":451,"tm":451,"am":451,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calabasahan","len":null,"ph":null,"dup":[5921,5931],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 59,088,584.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":846},{"i":5927,"cid":"24EH0081","pid":"P00823583LZ","t":"Construction of Mainit (DS - RS ) Flood Control Structure, Odiongan, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"ODIONGAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139924999.5,"fy":"2024","sd":"03/13/2024","cd":"2024-09-23","lat":12.4142,"lon":122.0158,"sm":1034,"fm":1034,"tm":1034,"am":1034,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4506},{"i":5928,"cid":"23GA0145","pid":"P00733714VS","t":"Construction of Revetment Wall along Malinao River, Brgy. Banay-Banay, Malinao, Aklan (Package 2)","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"MALINAO (AKLAN)","deo":"Aklan District Engineering Office","co":"SOLID MERCHANDISING","c":9899987.28,"abc":9900000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-09-15","lat":11.651947,"lon":122.302074,"sm":898,"fm":898,"tm":898,"am":898,"md":0.0,"ls":"inside","ww":"Malinao","wn":"Malinao River","wd":0.01,"wp":[11.65192,122.30195],"wst":"matched","br":"Banay-Banay","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4507},{"i":5929,"cid":"22CN0120","pid":"P00631164LZ","t":"Construction of Seawall, Brgy. Abuleg, Dinalungan, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"DINALUNGAN (AURORA)","deo":"Aurora District Engineering Office","co":"ZF CONSTRUCTION","c":13961777.38,"abc":14700000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-10-23","lat":16.115642,"lon":121.860294,"sm":511,"fm":511,"tm":511,"am":511,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Abuleg","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4508},{"i":5930,"cid":"23BB0137","pid":"P00742295LZ","t":"Construction of Slope Protection wall along Mission River in Barangay Cabanban Sur, Gonzaga, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"GONZAGA (CAGAYAN)","deo":"Cagayan 1st District Engineering Office","co":"APS CONSTRUCTION","c":4940000.0,"abc":4950000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-07-03","lat":18.246111,"lon":121.94,"sm":592,"fm":592,"tm":592,"am":592,"md":0.0,"ls":"inside","ww":"Mission","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabanban Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":591},{"i":5931,"cid":"22EH0149","pid":"P00640566LZ","t":"Construction of Seawall, Brgy. Masudsud, Sitio Proper, Concepcion, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"CONCEPCION (ROMBLON)","deo":"Romblon District Engineering Office","co":"SIM CONSTRUCTION, TRADING AND SERVICES","c":19785666.38,"abc":19799999.5,"fy":"2022","sd":"07/21/2022","cd":"2023-08-23","lat":12.916077,"lon":121.731634,"sm":451,"fm":451,"tm":451,"am":451,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masudsud","len":null,"ph":null,"dup":[5921,5926],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 59,088,584.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":847},{"i":5932,"cid":"22DH0064","pid":"P00621294LZ","t":"Bank Improvement along Pagsanjan River, Bgry. Magdapio, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"DMLC BUILDERS","c":93605267.39,"abc":96500000.0,"fy":"2022","sd":"09/09/2022","cd":"2023-08-25","lat":14.276944,"lon":121.458056,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4509},{"i":5933,"cid":"23GA0143","pid":"P00733712VS","t":"Construction of Revetment Wall along Malinao River, Brgy. Malandayon, Malinao, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"MALINAO (AKLAN)","deo":"Aklan District Engineering Office","co":"TOPMOST DEVELOPMENT & MKTG. CORP.","c":49499996.53,"abc":49500000.0,"fy":"2023","sd":"04/26/2023","cd":"2024-04-17","lat":11.645651,"lon":122.30222,"sm":898,"fm":898,"tm":898,"am":898,"md":0.0,"ls":"inside","ww":"Malinao","wn":"Malinao River","wd":0.01,"wp":[11.64556,122.30228],"wst":"matched","br":"Malandayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4510},{"i":5934,"cid":"21BA0036","pid":"P00525943LZ","t":"Construction of Uyugan Seawall, Brgy. Kayuganan Uyugan, Batanes","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"BATANES","mu":null,"deo":"Batanes District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":31164000.0,"abc":36750000.0,"fy":"2021","sd":"02/24/2021","cd":"2022-11-01","lat":20.349144,"lon":121.940513,"sm":null,"fm":null,"tm":null,"am":1619,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kayuganan Uyugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":141},{"i":5935,"cid":"24BD0202","pid":"P00845937LZ","t":"Rehablitation/Completion of Drainage, Brgy. Ajat, Iguig, Cagayan","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region II","pv":"CAGAYAN","mu":"IGUIG (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"4MD JSL CONSTRUCTION INC. (FORMERLY: JUST SAFE LEADING (JSL) INNOVATIVE CREATION CORPORATION)","c":2475000.0,"abc":2475000.0,"fy":"2024","sd":"08/15/2024","cd":"2024-12-09","lat":17.751753,"lon":121.735881,"sm":631,"fm":631,"tm":631,"am":631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ajat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4511},{"i":5936,"cid":"22EI0022","pid":"P00621116LZ","t":"Construction of Bansud River Control, Sta. 0+000 - Sta. 0+670, Bansud, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BANSUD (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48999734.76,"abc":48999689.3,"fy":"2022","sd":"06/03/2022","cd":"2023-04-05","lat":12.854444,"lon":121.458056,"sm":156,"fm":156,"tm":156,"am":156,"md":0.0,"ls":"inside","ww":"Bansud","wn":"Bansud","wd":0.02,"wp":[12.85463,121.458],"wst":"matched","br":null,"len":670.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4512},{"i":5937,"cid":"23GF0074","pid":"P00731678VS","t":"Construction of Anono-o Flood Control Project, Barangay Anono-o, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":48485657.34,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-10-23","lat":10.678611,"lon":122.302222,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anono-o","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4513},{"i":5938,"cid":"22JA0009","pid":"P00620107MN","t":"Construction of Shoreline Protection at Ayala Section, Zamboanga City","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"ZAMBOANGA CITY (ZAMBOANGA DEL SUR)","deo":"Zamboanga City 2nd District Engineering Office","co":"JAYKRIS ENTERPRISES & CONSTRUCTION (FORMERLY: JAYKRIS ENTERPRISES)","c":33723565.84,"abc":39104996.18,"fy":"2022","sd":"02/24/2022","cd":"2022-12-23","lat":6.962353,"lon":121.941808,"sm":1642,"fm":1642,"tm":1642,"am":1642,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4514},{"i":5939,"cid":"23PL0074","pid":"P00742291LZ","t":"Construction of the Flood Control Structure at Brgy. Cabaruan, Tabuk City, Kalinga Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"ZERO ONE CONSTRUCTION AND SUPPLY","c":4941699.76,"abc":4948513.52,"fy":"2023","sd":"06/20/2023","cd":"2023-08-30","lat":17.520908,"lon":121.45847,"sm":424,"fm":424,"tm":424,"am":424,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabaruan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4515},{"i":5940,"cid":"22BE0018","pid":"P00632798LZ","t":"Construction of Flood Control Structure with Channelization of Waterway along Aggub- San Juan Creek, Cabagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CABAGAN (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":14799986.51,"abc":14849986.5,"fy":"2022","sd":"02/15/2022","cd":"2022-08-27","lat":17.4111,"lon":121.73655,"sm":271,"fm":271,"tm":271,"am":271,"md":0.0,"ls":"inside","ww":"Aggub-San Juan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4516},{"i":5941,"cid":"23GA0102","pid":"P00721984VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Sigcay, Banga, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":48999545.82,"abc":49000000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-10-16","lat":11.607799,"lon":122.304299,"sm":147,"fm":147,"tm":147,"am":898,"md":0.79,"ls":"boundary","ww":"Aklan","wn":"Aklan River","wd":0.82,"wp":[11.6129,122.30982],"wst":"matched","br":"Sigcay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4517},{"i":5942,"cid":"23EA0030","pid":"P00726949LZ","t":"Construction of Laon Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 960, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"J.D. LEGASPI CONSTRUCTION / ZUIDEN BUILDERS INC.","c":77198380.79,"abc":77198000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-02-02","lat":13.489907,"lon":121.860499,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":960.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4518},{"i":5943,"cid":"22BE0039","pid":"P00621047LZ","t":"Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+190), Brgy. Aggasian, City of Ilagan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ILAGAN CITY (CAPITAL) (ISABELA)","deo":"Isabela 1st District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":44050000.0,"abc":44100000.0,"fy":"2022","sd":"05/18/2022","cd":"2023-02-05","lat":17.107077,"lon":121.944568,"sm":632,"fm":632,"tm":632,"am":632,"md":0.0,"ls":"inside","ww":"Ilagan","wn":"Ilagan River","wd":0.19,"wp":[17.10795,121.94611],"wst":"matched","br":"Aggasian","len":190.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4519},{"i":5944,"cid":"23DH0039","pid":"P00740388LZ","t":"Construction of River Control along Barangay Magdapio, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / JOBEL ENTERPRISES","c":90687783.34,"abc":91675000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-11-07","lat":14.269828,"lon":121.459631,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magdapio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4520},{"i":5945,"cid":"23BD0061","pid":"P00742302LZ","t":"Construction of Drainage at Pengue Ruyu and Caggay, Tuguegarao City, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"TUGUEGARAO CITY (CAPITAL) (CAGAYAN)","deo":"Cagayan 3rd District Engineering Office","co":"4MD JSL CONSTRUCTION INC. (FORMERLY: JUST SAFE LEADING (JSL) INNOVATIVE CREATION CORPORATION)","c":4925536.59,"abc":4950000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-11-15","lat":17.641474,"lon":121.737169,"sm":1603,"fm":1603,"tm":1603,"am":1603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4521},{"i":5946,"cid":"23GF0078","pid":"P00731680VS","t":"Construction of Lubacan Flood Control Project, Barangay Lubacan, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":48479090.03,"abc":49000000.0,"fy":"2023","sd":"03/23/2023","cd":"2024-04-03","lat":10.684444,"lon":122.304444,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lubacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4522},{"i":5947,"cid":"24BH0210","pid":"P00843237LZ","t":"Construction of Bantay Flood Control Structure, Section 1, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"JWU CONSTRUCTION AND SUPPLY","c":96475000.0,"abc":96500000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-11-12","lat":16.56223,"lon":121.738407,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4523},{"i":5948,"cid":"22EA0150","pid":"P00639508LZ","t":"Construction of Buenavista Seawall, Buenavista, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"BUENAVISTA (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"JEFF ENTERPRISES","c":14698930.12,"abc":14698000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-20","lat":13.252,"lon":121.945,"sm":241,"fm":241,"tm":241,"am":241,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4524},{"i":5949,"cid":"23BH0028","pid":"P00726139LZ","t":"Construction of Santo Domingo Flood Control Structure, Sta. 0 + 226 - Sta. 0 + 553, Santo Domingo, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"CASAN CONSTRUCTION AND TRADING","c":29399861.97,"abc":29400000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-04-26","lat":16.52581,"lon":121.861045,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":327.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4525},{"i":5950,"cid":"23BG0081","pid":"P00727265LZ","t":"Construction of Flood Control Project along Cagayan River, Pappat, Angadanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"ANGADANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"INFINITUM 888 CONSTRUCTION AND DEVELOPMENT CORPORATION / C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.)","c":94704698.46,"abc":95858913.52,"fy":"2023","sd":"03/15/2023","cd":"2023-11-06","lat":16.747522,"lon":121.739503,"sm":59,"fm":59,"tm":59,"am":59,"md":0.0,"ls":"inside","ww":"Cagayan","wn":"Cagayan River","wd":0.21,"wp":[16.74911,121.7406],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[5719,5280,5341],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23BG0079 to 23BG0082) cover the same site, together worth PHP 382,239,595.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":368},{"i":5951,"cid":"23DH0020","pid":"P00726221LZ","t":"Construction of River Control along Pagsanjan River, Barangay Maytalang, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":48999662.4,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-07-06","lat":14.289158,"lon":121.460286,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maytalang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4526},{"i":5952,"cid":"23BF0005","pid":"P00726417LZ","t":"Construction of Siffu River Flood Control Project (Cabaruan Section), Sta. 0+000 - Sta. 0+600, Quirino, Isabela,","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"QUIRINO (ISABELA)","deo":"Isabela 2nd District Engineering Office","co":"ANORE CONSTRUCTION","c":48248853.2,"abc":48250000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-08-06","lat":17.114717,"lon":121.739552,"sm":1195,"fm":1195,"tm":1195,"am":563,"md":0.02,"ls":"boundary","ww":"Siffu","wn":"Siffu River","wd":0.01,"wp":[17.11466,121.7396],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4527},{"i":5953,"cid":"23BH0079","pid":"P00736191LZ","t":"Construction of Villa Marzo Flood Control Structure, Section 2, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48999666.52,"abc":49000000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-05-13","lat":16.731059,"lon":121.46146,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4528},{"i":5954,"cid":"23BH0029","pid":"P00726138LZ","t":"Construction of Minuri Flood Control Structure, Sta. 0 + 226 - Sta. 0 + 553, Minuri, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"CASAN CONSTRUCTION AND TRADING","c":29399253.02,"abc":29400000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-06-15","lat":16.531117,"lon":121.862167,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":327.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4529},{"i":5955,"cid":"23BH0080","pid":"P00736190LZ","t":"Construction of Villa Marzo Flood Control Structure, Section 1, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48999858.51,"abc":49000000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-05-14","lat":16.731059,"lon":121.4616,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4530},{"i":5956,"cid":"23DH0051","pid":"P00740389LZ","t":"Construction of River Control along Barangay Pinagsanjan, Pagsanjan, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PAGSANJAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":88893886.0,"abc":91675000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-02-21","lat":14.267049,"lon":121.462114,"sm":1061,"fm":1061,"tm":1061,"am":1061,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagsanjan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4531},{"i":5957,"cid":"22BH0147","pid":"P00639464LZ","t":"Construction of Santo Domingo Flood Control Structure, Minuri, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT)","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"06/28/2022","cd":"2022-11-23","lat":16.530985,"lon":121.862188,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4532},{"i":5958,"cid":"24EI0071","pid":"P00825250LZ","t":"Construction of Bansud River Control, Barangay Malaya Section, Bansud, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BANSUD (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION","c":48997595.16,"abc":49000000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-09-26","lat":12.855139,"lon":121.462222,"sm":156,"fm":156,"tm":156,"am":156,"md":0.0,"ls":"inside","ww":"Bansud","wn":"Bansud","wd":0.01,"wp":[12.85516,121.46214],"wst":"matched","br":"Malaya Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4533},{"i":5959,"cid":"23BH0128","pid":"P00726873LZ","t":"Construction of Barangay Sto. Domingo Flood Control Structure, Section 2, Jones, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"JONES (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"V.B. MANUBAY CONSTRUCTION","c":96499762.04,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-08-14","lat":16.503982,"lon":121.862674,"sm":673,"fm":673,"tm":673,"am":673,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo Flood Control Structure","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4534},{"i":5960,"cid":"23DH0019","pid":"P00726222LZ","t":"Construction of River Control along Pagsanjan River, Barangay Balubad, Lumban, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"LUMBAN (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48999768.02,"abc":49000000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-08-09","lat":14.286033,"lon":121.463076,"sm":825,"fm":825,"tm":825,"am":825,"md":0.0,"ls":"inside","ww":"Pagsanjan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balubad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4535},{"i":5961,"cid":"23EA0007","pid":"P00737546LZ","t":"Construction of Flood Control Structure, Barangay Bintakay, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"KEJAMARENIK CONSTRUCTION & CONSTRUCTION SUPPLIES","c":4849037.42,"abc":4947999.99,"fy":"2023","sd":"01/31/2023","cd":"2023-04-20","lat":13.4926,"lon":121.863136,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bintakay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4536},{"i":5962,"cid":"23CN0113","pid":"P00740579LZ","t":"Construction of Flood Control Structure, Brgy. Bayanihan, Maria Aurora, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-26","lat":15.86216,"lon":121.46313,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayanihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4537},{"i":5963,"cid":"21EA0085","pid":"P00526330LZ","t":"Construction of Flood Control Along Boac River, Brgy. Sawi, Boac, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"Boac","deo":"Marinduque District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96502061.41,"abc":96498000.0,"fy":"2021","sd":"03/26/2021","cd":"2022-09-16","lat":13.43908,"lon":121.86326,"sm":214,"fm":null,"tm":214,"am":214,"md":0.0,"ls":"inside","ww":"Boac","wn":"Boac River","wd":0.03,"wp":[13.43889,121.86346],"wst":"matched","br":"Sawi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4538},{"i":5964,"cid":"23BC0079","pid":"P00727349LZ","t":"Construction of Bank Protection along Chico River, Sicatna, Piat, Cagayan (Package V)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PIAT (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"DEKM CONSTRUCTION / DECERIE'S CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-11-24","lat":17.825556,"lon":121.464444,"sm":1123,"fm":1123,"tm":1123,"am":1123,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.05,"wp":[17.82561,121.46489],"wst":"matched","br":null,"len":null,"ph":"Package V","dup":[],"run":[5846,5988],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BC0077 to 23BC0079) cover the same site, together worth PHP 82,170,831.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":619},{"i":5965,"cid":"22EI0005","pid":"P00621118LZ","t":"Construction of Baroc River Control, Brgy. San Miguel Section, Sta. 0+000 - Sta. 0+802, Roxas, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"ROXAS (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":48999910.68,"abc":48999355.56,"fy":"2022","sd":"04/11/2022","cd":"2022-12-16","lat":12.6075,"lon":121.465833,"sm":1223,"fm":1223,"tm":1223,"am":1223,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Miguel Section","len":802.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4539},{"i":5966,"cid":"22EA0235","pid":"P00639509LZ","t":"Construction of Candahon Flood Control Structure, Mogpog, Marinduque","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"MARINDUQUE","mu":"MOGPOG (MARINDUQUE)","deo":"Marinduque District Engineering Office","co":"SARGASSO CONSTRUCTION & DEVELOPMENT CORP.","c":38862577.77,"abc":39198000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-03-27","lat":13.4788,"lon":121.8642,"sm":982,"fm":982,"tm":982,"am":982,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4540},{"i":5967,"cid":"23CN0114","pid":"P00740580LZ","t":"Construction of Flood Control Structure, Brgy. Kadayacan, Maria Aurora, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-07-25","lat":15.8148,"lon":121.46646,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kadayacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4541},{"i":5968,"cid":"24BC0066","pid":"P00823332LZ","t":"Construction of Sicalao River Control Structure along Zinundungan River, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"FLAVIE CIVIL ENGINEERING CONSTRUCTION","c":19266187.98,"abc":19600000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-07-12","lat":18.026389,"lon":121.468889,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":"Sicalao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4542},{"i":5969,"cid":"22EI0088","pid":"P00639533LZ","t":"Construction of Malitbog River Control Structure (Downstream), Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":48999912.4,"abc":48999976.68,"fy":"2022","sd":"04/11/2022","cd":"2023-02-14","lat":12.758889,"lon":121.469167,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Malitbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4543},{"i":5970,"cid":"23BC0020","pid":"P00726117LZ","t":"Restoration of Zinundungan Flood Control, Sta. 0+000 - Sta. 0+100, Sicalao, Lasam, Cagayan","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"LASAM (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"FLAVIE CIVIL ENGINEERING CONSTRUCTION","c":22758838.0,"abc":23428860.0,"fy":"2023","sd":"02/02/2023","cd":"2023-07-15","lat":18.02728,"lon":121.46931,"sm":759,"fm":759,"tm":759,"am":759,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4544},{"i":5971,"cid":"23DH0010","pid":"P00725817LZ","t":"Construction of River Control along Pangil River, Pangil, Laguna","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"LAGUNA","mu":"PANGIL (LAGUNA)","deo":"Laguna 1st District Engineering Office","co":"DMLC BUILDERS","c":72606074.11,"abc":74723810.0,"fy":"2023","sd":"02/09/2023","cd":"2024-02-19","lat":14.405108,"lon":121.471164,"sm":1087,"fm":1087,"tm":1087,"am":1087,"md":0.0,"ls":"inside","ww":"Pangil","wn":"Pangil River","wd":0.0,"wp":[14.40513,121.47116],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4545},{"i":5972,"cid":"24EI0018","pid":"P00821354LZ","t":"Construction of Balite River Control, Sta. 0+300 - Sta. 0+718 (Balite Bridge Abutment B - Upstream), Barangay Balite, Gloria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"GLORIA (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT / BANAYAD CONSTRUCTION SERVICES","c":67547131.91,"abc":67550000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-20","lat":12.943611,"lon":121.471389,"sm":589,"fm":589,"tm":589,"am":589,"md":0.0,"ls":"inside","ww":"Balite","wn":"Balite River","wd":0.01,"wp":[12.94366,121.47151],"wst":"matched","br":"Balite","len":418.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4546},{"i":5973,"cid":"23BH0078","pid":"P00736607LZ","t":"Construction of Tanggal Flood control Structure, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48999983.08,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-11","lat":16.684186,"lon":121.472032,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4547},{"i":5974,"cid":"24BC0097","pid":"P00845935LZ","t":"Construction of Flood Control Structure along Chico River, Aquib, Piat, Cagayan (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"PIAT (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"DEKM CONSTRUCTION","c":9701811.56,"abc":9900000.0,"fy":"2024","sd":"04/04/2024","cd":"2024-12-29","lat":17.794936,"lon":121.473083,"sm":1123,"fm":1123,"tm":1123,"am":1123,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.13,"wp":[17.79436,121.47203],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4548},{"i":5975,"cid":"22CN0102","pid":"P00631144LZ","t":"Construction of Drainage Canal (Phase II), Brgy. Quirino, Maria Aurora, Aurora","w":"Construction of Drainage Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"MORNING STEEL CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-11-16","lat":15.76727,"lon":121.47405,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quirino","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4549},{"i":5976,"cid":"22EI0096","pid":"P00639532LZ","t":"Construction of Flood Control Structure, Brgy. Balite, Gloria, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"GLORIA (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":19599783.18,"abc":19599699.81,"fy":"2022","sd":"04/13/2022","cd":"2022-12-19","lat":12.944444,"lon":121.474444,"sm":589,"fm":589,"tm":589,"am":589,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4550},{"i":5977,"cid":"24BH0277","pid":"P00843283LZ","t":"Construction of Tanggal Flood Control Structure, Section 1, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"06/24/2024","cd":"2024-11-11","lat":16.683653,"lon":121.474472,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4551},{"i":5978,"cid":"24PL0061","pid":"P00824672LZ","t":"Construction of Burayukan Flood Control along Aliog RIver, Balong, Tabuk City, Kalinga","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"KALINGA","mu":"CITY OF TABUK (CAPITAL) (KALINGA)","deo":"Lower Kalinga District Engineering Office","co":"ZERO ONE CONSTRUCTION AND SUPPLY","c":9793424.9,"abc":9800000.0,"fy":"2024","sd":"06/11/2024","cd":"2024-07-25","lat":17.556308,"lon":121.475732,"sm":424,"fm":424,"tm":424,"am":1145,"md":0.93,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4552},{"i":5979,"cid":"23BH0076","pid":"P00736608LZ","t":"Construction of Aguinaldo Flood control Structure, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION)","c":48999988.6,"abc":49000000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-10-31","lat":16.723941,"lon":121.476227,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4553},{"i":5980,"cid":"22EI0017","pid":"P00621117LZ","t":"Construction of Baroc River Control, Brgy. San Aquilino Section, Sta. 0+000 - Sta. 0+796, Roxas, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"ROXAS (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48999931.65,"abc":48999150.02,"fy":"2022","sd":"04/13/2022","cd":"2022-12-18","lat":12.5875,"lon":121.476667,"sm":1223,"fm":1223,"tm":1223,"am":1223,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Aquilino Section","len":796.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4554},{"i":5981,"cid":"24BH0002","pid":"P00820784LZ","t":"Construction of Aguinaldo Flood Control, Section 3, Cordon, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"CORDON (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"FNS BUILDERS & ENTERPRISE","c":9636008.66,"abc":9800000.0,"fy":"2024","sd":"07/01/2024","cd":"2024-08-10","lat":16.723298,"lon":121.476951,"sm":455,"fm":455,"tm":455,"am":455,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4555},{"i":5982,"cid":"24BH0001","pid":"P00820786LZ","t":"Construction of Flood Control Structure, Masaya Norte, San Agustin, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"SAN AGUSTIN (ISABELA)","deo":"Isabela 4th District Engineering Office","co":"NTL BUILDERS AND DEVELOPER","c":42147840.0,"abc":42147840.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-17","lat":16.722625,"lon":121.477447,"sm":1250,"fm":1250,"tm":1250,"am":455,"md":32.93,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":32.93,"text":"The pin is 32.9 km outside San Agustin, Isabela, the nearest municipality the record claims. It falls in Cordon, Isabela.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":198},{"i":5983,"cid":"22EI0012","pid":"P00621121LZ","t":"Construction of Bongabong River Control, Brgy. Luna Section, Sta. 0+000 - Sta. 0+334, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"TWENTY SIXTEEN CONSTRUCTION AND GENERAL MERCHANDISE / LUMEL GLENN CONSTRUCTION","c":48999950.04,"abc":48999243.91,"fy":"2022","sd":"04/13/2022","cd":"2023-01-17","lat":12.673889,"lon":121.478333,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Bongabong","wn":"Bongabong River","wd":0.26,"wp":[12.67364,121.48075],"wst":"matched","br":"Luna Section","len":334.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4556},{"i":5984,"cid":"22PM0016","pid":"P00620138LZ","t":"Construction of Flood Control Structure, Bagwang Proper, Sta. 088+900 - Sta. 089+500 (R.S.), Palitod, Paracelis, Mountain Province","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"MOUNTAIN PROVINCE","mu":"PARACELIS (MOUNTAIN PROVINCE)","deo":"Mountain Province 2nd District Engineering Office","co":"MG SAMIDAN CONSTRUCTION / A.P.O. GENERAL CONSTRUCTION","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-11-23","lat":17.1249,"lon":121.47876,"sm":1102,"fm":1102,"tm":1102,"am":1102,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4557},{"i":5985,"cid":"24CN0192","pid":"P00824692LZ","t":"Construction of Balitwak-San Isidro Flood Control, San Luis, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"SAN LUIS (AURORA)","deo":"Aurora District Engineering Office","co":"DALCON CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"05/07/2024","cd":"2024-08-22","lat":15.717209,"lon":121.479772,"sm":1320,"fm":1320,"tm":1320,"am":1320,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4558},{"i":5986,"cid":"22EI0116","pid":"P00621120LZ","t":"Construction of Baroc River Control, Villa Celestial Section, Sta. 0+000 - Sta. 0+680, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ALBERTO UY CONSTRUCTION & DEVELOPMENT","c":47597494.09,"abc":49000000.0,"fy":"2022","sd":"07/20/2022","cd":"2023-08-21","lat":12.560556,"lon":121.480556,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":680.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4559},{"i":5987,"cid":"23PJ0018","pid":"P00725655LZ","t":"Construction of Busilac Flood Control, Sta. 27 + 753 - Sta. 28 + 951 (LS), Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION","c":86850000.0,"abc":86849025.68,"fy":"2023","sd":"05/07/2023","cd":"2024-01-31","lat":16.93124,"lon":121.48062,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1198.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4560},{"i":5988,"cid":"23BC0078","pid":"P00727348LZ","t":"Construction of Bank Protection along Chico River, Lipatan, Sto. Niño, Cagayan ( Package V)","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"SANTO NIÑO (FAIRE) (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"TJMT CONSTRUCTION / VHT CAGAYAN BUILDERS CORPORATION","c":28665000.0,"abc":29400000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-09-09","lat":17.850134,"lon":121.481605,"sm":1412,"fm":1412,"tm":1412,"am":1412,"md":0.0,"ls":"inside","ww":"Chico","wn":"Chico River","wd":0.29,"wp":[17.84779,121.48273],"wst":"matched","br":null,"len":null,"ph":"Package V","dup":[],"run":[5846,5964],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23BC0077 to 23BC0079) cover the same site, together worth PHP 82,170,831.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":652},{"i":5989,"cid":"23EI0047","pid":"P00727199LZ","t":"Construction of Orconuma River Control (Upstream), Abutment B, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"BONGABONG (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48999818.34,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-10-25","lat":12.671389,"lon":121.481667,"sm":223,"fm":223,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":"Orconuma","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4561},{"i":5990,"cid":"21EI0150","pid":"P00561580LZ","t":"Construction of Brgy. Aplaya Seawall, Bongabong, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Bongabong","deo":"Southern Mindoro District Engineering Office","co":"NORTHERN BUILDERS","c":29399927.83,"abc":29399220.03,"fy":"2021","sd":"04/08/2022","cd":"2022-10-24","lat":12.759167,"lon":121.481667,"sm":223,"fm":null,"tm":223,"am":223,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Aplaya Seawall","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4562},{"i":5991,"cid":"21EI0128","pid":"P00526460LZ","t":"Construction of Baroc River Control, Roma Section, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"Mansalay","deo":"Southern Mindoro District Engineering Office","co":"D.M. MALIWANAG BUILDERS AND ENTERPRISES","c":19599948.04,"abc":19599121.99,"fy":"2021","sd":"04/08/2022","cd":"2022-10-14","lat":12.581667,"lon":121.4825,"sm":923,"fm":null,"tm":923,"am":1223,"md":0.02,"ls":"boundary","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4563},{"i":5992,"cid":"23EI0023","pid":"P00726594LZ","t":"Construction of Flood Control Structure along Baroc River, Sta. Brigida, Mansalay, Oriental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":82022349.1,"abc":82024998.49,"fy":"2023","sd":"02/17/2023","cd":"2023-12-18","lat":12.581389,"lon":121.483889,"sm":923,"fm":923,"tm":923,"am":1223,"md":0.01,"ls":"boundary","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4564},{"i":5993,"cid":"22PJ0044","pid":"P00620480LZ","t":"Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao","w":"Construction of Flood Mitigation Structure","rg":"Cordillera Administrative Region","pv":"IFUGAO","mu":"ALFONSO LISTA (POTIA) (IFUGAO)","deo":"Ifugao 2nd District Engineering Office","co":"DJY CONSTRUCTION / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE","c":24010000.0,"abc":76237286.54,"fy":"2022","sd":"05/23/2022","cd":"2023-03-05","lat":16.931082,"lon":121.48422,"sm":34,"fm":34,"tm":34,"am":34,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4565},{"i":5994,"cid":"23EI0018","pid":"P00725863LZ","t":"Construction of Wasig River Control Structure, Brgy. Villa Celestial, Mansalay, Oriental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":77197292.65,"abc":77199988.11,"fy":"2023","sd":"02/17/2023","cd":"2024-02-06","lat":12.554167,"lon":121.486389,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Wasig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Villa Celestial","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4566},{"i":5995,"cid":"22EI0018","pid":"P00621119LZ","t":"Construction of Baroc River Control, Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+770, Mansalay, Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"LUMEL GLENN CONSTRUCTION","c":48996447.0,"abc":48999404.78,"fy":"2022","sd":"06/03/2022","cd":"2023-03-09","lat":12.571389,"lon":121.486389,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Baroc","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Brigida Section","len":770.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4567},{"i":5996,"cid":"23BC0092","pid":"P00740571LZ","t":"Construction of Slope Protection of Macugay Bridge Approaches along Kinawayan Creek, Nararagan, Ballesteros","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"CAGAYAN","mu":"BALLESTEROS (CAGAYAN)","deo":"Cagayan 2nd District Engineering Office","co":"J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"04/28/2023","cd":"2023-08-18","lat":18.307843,"lon":121.487965,"sm":137,"fm":137,"tm":137,"am":137,"md":0.0,"ls":"inside","ww":"Kinawayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4568},{"i":5997,"cid":"24EI0076","pid":"P00825252LZ","t":"Construction of Wasig River Control (Downstream), Barangay Wasig, Mansalay,Oriental Mindoro","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ORIENTAL MINDORO","mu":"MANSALAY (ORIENTAL MINDORO)","deo":"Southern Mindoro District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES","c":48996871.4,"abc":49000000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-12-16","lat":12.552964,"lon":121.488344,"sm":923,"fm":923,"tm":923,"am":923,"md":0.0,"ls":"inside","ww":"Wasig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Wasig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4569},{"i":5998,"cid":"23E00017","pid":"P00725867LZ","t":"Construction of Shore Protection and Coastal Road Development along Barangay San Vicente, Package 1, Santa Cruz, Occidental Mindoro","w":"Construction of Revetment","rg":"Region IV-B","pv":"OCCIDENTAL MINDORO","mu":"SANTA CRUZ (OCCIDENTAL MINDORO)","deo":"Mindoro Occidental District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96496887.97,"abc":96499999.33,"fy":"2023","sd":"02/11/2023","cd":"2023-12-10","lat":12.7495,"lon":121.4905,"sm":1380,"fm":1380,"tm":1380,"am":223,"md":67.07,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":67.07,"text":"The pin is 67.1 km outside Santa Cruz, Occidental Mindoro, the nearest municipality the record claims. It falls in Bongabong, Oriental Mindoro.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":99},{"i":5999,"cid":"22C00093","pid":"P00620496LZ","t":"Construction of Flood Mitigation Structure and Drainage System, Diteki River (Left Side) Improvement Project, Maria Aurora, Aurora","w":"Construction of Flood Mitigation Structure","rg":"Region III","pv":"AURORA","mu":"MARIA AURORA (AURORA)","deo":"Aurora District Engineering Office","co":"R.D. TALENS CONSTRUCTION AND TRADING","c":48248213.19,"abc":48248290.0,"fy":"2022","sd":"08/15/2022","cd":"2023-04-06","lat":15.752364,"lon":121.492478,"sm":938,"fm":938,"tm":938,"am":938,"md":0.0,"ls":"inside","ww":"Diteki","wn":"Diteki River","wd":0.02,"wp":[15.75221,121.49255],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4570},{"i":6000,"cid":"23GN0074","pid":"P00733734VS","t":"Construction of Flood Mitigation Structures along Patic Creek, Pulupandan, Negros Occidental (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"PULUPANDAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":49499990.0,"abc":49499999.57,"fy":"2023","sd":"04/11/2023","cd":"2023-12-24","lat":10.5269,"lon":122.8113,"sm":1183,"fm":1183,"tm":1183,"am":1183,"md":0.0,"ls":"inside","ww":"Patic","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4571},{"i":6001,"cid":"22GN0063","pid":"P00633222VS","t":"Construction of Bank Protection Structure along Valladolid Seawall, Valladolid, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"VALLADOLID (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48999974.49,"abc":48999995.95,"fy":"2022","sd":"03/31/2022","cd":"2022-10-18","lat":10.47776,"lon":122.82071,"sm":1623,"fm":1623,"tm":1623,"am":1623,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4572},{"i":6002,"cid":"24GN0015","pid":"P00820017VS","t":"Construction of Flood Mitigation Structure along Valladolid Seawall, Valladolid, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"VALLADOLID (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"R.A. CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: R.A. CONSTRUCTION & GENERAL MERCHANDISE)","c":70173447.67,"abc":70637027.15,"fy":"2024","sd":"03/05/2024","cd":"2024-10-14","lat":10.47864,"lon":122.82111,"sm":1623,"fm":1623,"tm":1623,"am":1623,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4573},{"i":6003,"cid":"23GD0032","pid":"P00721735VS","t":"Construction of Flood Mitigation Facilities along Panay/Mambusao River Basin, Tico River Control, Panay, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"PANAY (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"MEGAGOLD CONSTRUCTION AND DEVELOPMENT, OPC / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":88200838.4,"abc":88201000.0,"fy":"2023","sd":"03/08/2023","cd":"2024-03-21","lat":11.493076,"lon":122.821765,"sm":1078,"fm":1078,"tm":1078,"am":1078,"md":0.0,"ls":"inside","ww":"Mambusao","wn":"Mambusao River","wd":17.34,"wp":[11.40216,122.69221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4574},{"i":6004,"cid":"22HL0033","pid":"P00620313VS","t":"Rehabilitation of Canalum River Control, Downstream B, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-02-28","lat":9.4,"lon":122.82306,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Canalum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[6008,6009,6010],"cl":[],"L":"records","s":48,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22HL0032 to 22HL0035) cover the same site, together worth PHP 163,329,740.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":210},{"i":6005,"cid":"22FC0184","pid":"P00631388LZ","t":"Construction of Flood Control River in Barangay Dalas, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":23519677.48,"abc":23519677.48,"fy":"2022","sd":"03/31/2022","cd":"2023-05-04","lat":14.142269,"lon":122.823164,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4575},{"i":6006,"cid":"23GO0024","pid":"P00721629VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Luzuriaga St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"GOLDSTAR MARKETING & CONSTRUCTION SERVICES, INC.","c":19296606.08,"abc":19600000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-28","lat":10.664174,"lon":122.954016,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4576},{"i":6007,"cid":"23GI0030","pid":"P00721748VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay Poblacion, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96499391.23,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2024-02-17","lat":10.818397,"lon":122.434667,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4577},{"i":6008,"cid":"22HL0032","pid":"P00620310VS","t":"Rehabilitation of Canalum River Control, Downstream A, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":42525140.0,"abc":42525140.0,"fy":"2022","sd":"02/17/2022","cd":"2023-03-23","lat":9.39972,"lon":122.82333,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Canalum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6009],"run":[6004,6009,6010],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 81,303,740.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22HL0032 to 22HL0035) cover the same site, together worth PHP 163,329,740.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":135},{"i":6009,"cid":"22HL0034","pid":"P00620311VS","t":"Rehabilitation of Canalum River Control, Upstream A, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":38778600.0,"abc":38778600.0,"fy":"2022","sd":"02/17/2022","cd":"2023-03-23","lat":9.39972,"lon":122.82333,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Canalum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6008],"run":[6008,6004,6010],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 81,303,740.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22HL0032 to 22HL0035) cover the same site, together worth PHP 163,329,740.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":136},{"i":6010,"cid":"22HL0035","pid":"P00620312VS","t":"Rehabilitation of Canalum River Control, Upstream B, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":42826000.0,"abc":42826000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-02-14","lat":9.4,"lon":122.82333,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Canalum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[6008,6004,6009],"cl":[],"L":"records","s":48,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":1,"text":"Coordinates are recorded with only 1 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22HL0032 to 22HL0035) cover the same site, together worth PHP 163,329,740.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":211},{"i":6011,"cid":"22GD0028","pid":"P00620264VS","t":"Construction of Flood Mitigation Facilities along Panay/Mambusao River Basin, Talasa River Control, Brgy. Talasa, Panay, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"PANAY (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / SALMEGA BUILDERS","c":62724975.2,"abc":62725000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-15","lat":11.489162,"lon":122.824124,"sm":1078,"fm":1078,"tm":1078,"am":1160,"md":0.16,"ls":"boundary","ww":"Mambusao","wn":"Mambusao River","wd":17.31,"wp":[11.40216,122.69221],"wst":"matched","br":"Talasa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4578},{"i":6012,"cid":"22GD0048","pid":"P00620265VS","t":"Construction of Flood Mitigation Facility along Panay/Mambusao River Basin, Jebacca River Control, Maayon, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"MA-AYON (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":57899349.35,"abc":57900000.0,"fy":"2022","sd":"03/27/2022","cd":"2023-09-10","lat":11.375365,"lon":122.824726,"sm":837,"fm":837,"tm":837,"am":837,"md":0.0,"ls":"inside","ww":"Mambusao","wn":"Mambusao River","wd":14.76,"wp":[11.40216,122.69221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4579},{"i":6013,"cid":"23FC0060","pid":"P00736150LZ","t":"Construction of Flood Control Structure along Busig-on River (Upstream) Phase II, Brgy. Mabilo II, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"C.B. GARAY PHILWIDE BUILDERS","c":57899877.77,"abc":57899877.77,"fy":"2023","sd":"04/05/2023","cd":"2023-12-31","lat":14.145446,"lon":122.828155,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Busig-on","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mabilo II","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4580},{"i":6014,"cid":"22GD0041","pid":"P00620263VS","t":"Construction of Flood Mitigation Facilities along Panay/Mambusao River Basin, Pontevedra River Control including Esplanade, Pontevedra, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"PONTEVEDRA (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":62724396.82,"abc":62725000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-12-21","lat":11.484163,"lon":122.828263,"sm":1160,"fm":1160,"tm":1160,"am":1160,"md":0.0,"ls":"inside","ww":"Mambusao","wn":"Mambusao River","wd":17.39,"wp":[11.40216,122.69221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4581},{"i":6015,"cid":"24GM0015","pid":"P00820291VS","t":"Construction of Flood Mitigation Structure along Hilabangan River, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":110098780.0,"abc":110098780.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-23","lat":9.95636,"lon":122.82929,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Hilabangan","wn":"Hilabangan River","wd":0.04,"wp":[9.95663,122.8295],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4582},{"i":6016,"cid":"23FC0042","pid":"P00736126LZ","t":"Construction of Flood Control Structure, Brgy. San Antonio, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":77004263.34,"abc":96499853.8,"fy":"2023","sd":"04/05/2023","cd":"2024-01-05","lat":14.11612,"lon":122.82957,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4583},{"i":6017,"cid":"23FC0039","pid":"P00736127LZ","t":"Construction of Flood Control Structure at Labo River, Mabilo II, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":95553202.05,"abc":96499492.62,"fy":"2023","sd":"07/27/2023","cd":"2024-07-26","lat":14.148553,"lon":122.829671,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":0.07,"wp":[14.1489,122.82914],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4584},{"i":6018,"cid":"22FC0052","pid":"P00631397LZ","t":"Construction of Flood Control Structure of Mabilo II, Labo, Camarines Norte (Labo River)","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":19014625.6,"abc":19599469.25,"fy":"2022","sd":"03/22/2022","cd":"2023-02-14","lat":14.1494,"lon":122.8304,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":0.08,"wp":[14.14981,122.82975],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4585},{"i":6019,"cid":"23FC0045","pid":"P00737562LZ","t":"Construction of Flood Control Structure (Phase 4), Barangay San Antonio, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"C.B. GARAY PHILWIDE BUILDERS","c":48969976.29,"abc":49499290.12,"fy":"2023","sd":"04/05/2023","cd":"2024-03-24","lat":14.11815,"lon":122.83082,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4586},{"i":6020,"cid":"22FC0051","pid":"P00620698LZ","t":"Construction of Labo River Control Structure (Mabilo Section), Brgy. Mabilo, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":48999850.41,"abc":48999850.41,"fy":"2022","sd":"03/31/2022","cd":"2023-03-30","lat":14.150833,"lon":122.83135,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":0.08,"wp":[14.15124,122.83072],"wst":"matched","br":"Mabilo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4587},{"i":6021,"cid":"22GN0001","pid":"P00620307VS","t":"Construction of Flood Mitigation Structure along Bago River, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48999243.3,"abc":48999994.27,"fy":"2022","sd":"02/10/2022","cd":"2022-09-03","lat":10.53294,"lon":122.83197,"sm":109,"fm":109,"tm":null,"am":109,"md":0.0,"ls":"inside","ww":"Bago","wn":"Bago River","wd":0.14,"wp":[10.5324,122.83077],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4588},{"i":6022,"cid":"22FC0074","pid":"P00631389LZ","t":"Construction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":33270844.9,"abc":34299370.0,"fy":"2022","sd":"03/21/2022","cd":"2023-03-03","lat":14.152117,"lon":122.832667,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4589},{"i":6023,"cid":"22FC0079","pid":"P00631390LZ","t":"Construction of Flood Control Structure (Phase 2) at Brgy. Mabilo, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":34299455.1,"abc":34299455.1,"fy":"2022","sd":"03/21/2022","cd":"2023-05-04","lat":14.150744,"lon":122.833192,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4590},{"i":6024,"cid":"22FC0080","pid":"P00631392LZ","t":"Construction of Flood Control Structure along Matogdon River, Barangay Mabilo 2, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":23747366.08,"abc":24499786.26,"fy":"2022","sd":"03/23/2022","cd":"2023-06-02","lat":14.149692,"lon":122.834092,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Matogdon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mabilo 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4591},{"i":6025,"cid":"23GN0051","pid":"P00721745VS","t":"Construction of Flood Mitigation Structure along Bago River, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":80094986.22,"abc":80094995.15,"fy":"2023","sd":"04/11/2023","cd":"2024-02-11","lat":10.5267,"lon":122.8344,"sm":109,"fm":109,"tm":null,"am":109,"md":0.0,"ls":"inside","ww":"Bago","wn":"Bago River","wd":0.1,"wp":[10.52633,122.83359],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4592},{"i":6026,"cid":"23FC0062","pid":"P00736626LZ","t":"Construction of Flood Control Structure (Phase 2) at Brgy. Mabilo, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"C.B. GARAY PHILWIDE BUILDERS","c":48999703.48,"abc":48999703.48,"fy":"2023","sd":"05/03/2023","cd":"2024-05-13","lat":14.12473,"lon":122.83444,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4593},{"i":6027,"cid":"21FC0106","pid":"P00561470LZ","t":"Construction of Flood Control Structure at Mabilo 2 - Mabilo 1, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"Labo","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":96499331.17,"abc":96499331.17,"fy":"2021","sd":"12/01/2021","cd":"2022-09-02","lat":14.149131,"lon":122.835033,"sm":729,"fm":null,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4594},{"i":6028,"cid":"22FC0073","pid":"P00631393LZ","t":"Construction of Flood Control Structure at Barangay Mabilo II, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":24499765.86,"abc":24499765.86,"fy":"2022","sd":"03/11/2022","cd":"2022-10-22","lat":14.144644,"lon":122.835547,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4595},{"i":6029,"cid":"23FC0061","pid":"P00736130LZ","t":"Construction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"C.B. GARAY PHILWIDE BUILDERS","c":48250000.0,"abc":48999537.51,"fy":"2023","sd":"04/05/2023","cd":"2024-05-08","lat":14.12681,"lon":122.83581,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4596},{"i":6030,"cid":"22GA0037","pid":"P00620293VS","t":"Rehabilitation of Revetment Wall along Aklan River, Brgy. Daja Sur, Banga, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":19177758.11,"abc":19600000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-04-17","lat":11.565184,"lon":122.304826,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.02,"wp":[11.56519,122.30499],"wst":"matched","br":"Daja Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4597},{"i":6031,"cid":"22FC0078","pid":"P00631411LZ","t":"Construction of River Control, Barangay Mabilo I - Barangay San Antonio, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":48997951.93,"abc":48999753.44,"fy":"2022","sd":"03/17/2022","cd":"2022-11-25","lat":14.140256,"lon":122.836519,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4598},{"i":6032,"cid":"22FC0076","pid":"P00631394LZ","t":"Construction of Flood Control Structure at Brgy. Mabilo 1, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":33270352.17,"abc":34299611.43,"fy":"2022","sd":"03/21/2022","cd":"2023-03-03","lat":14.141775,"lon":122.836844,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabilo 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4599},{"i":6033,"cid":"22GM0022","pid":"P00630209VS","t":"Construction of Flood Mitigation Structure along Hilabangan River (Upstream of Approach B of Hilabangan Br.), Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-10-25","lat":9.9681,"lon":122.83765,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Hilabangan","wn":"Hilabangan River","wd":0.02,"wp":[9.96827,122.83754],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4600},{"i":6034,"cid":"23GM0013","pid":"P00721743VS","t":"Construction of Flood Mitigation Structure along Hilabangan River (Upstream of Approach B of Hilabangan Br.) Phase 1, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":89262500.0,"abc":89262500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-08-22","lat":9.973782,"lon":122.839634,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Hilabangan","wn":"Hilabangan River","wd":0.39,"wp":[9.9707,122.84135],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4601},{"i":6035,"cid":"22GN0035","pid":"P00630211VS","t":"Construction of Flood Control Structure at Sibud Creek, Brgy. Poblacion, Bago City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48656985.15,"abc":48999991.34,"fy":"2022","sd":"03/31/2022","cd":"2022-11-02","lat":10.54046,"lon":122.840237,"sm":109,"fm":109,"tm":109,"am":109,"md":0.0,"ls":"inside","ww":"Sibud","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4602},{"i":6036,"cid":"22GN0058","pid":"P00633223VS","t":"Construction of Waterway Structure along Sibud Creek, Bago City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48563891.77,"abc":48999991.7,"fy":"2022","sd":"03/31/2022","cd":"2023-02-13","lat":10.544,"lon":122.8417,"sm":109,"fm":109,"tm":109,"am":109,"md":0.0,"ls":"inside","ww":"Sibud","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4603},{"i":6037,"cid":"24GM0014","pid":"P00820290VS","t":"Construction of Flood Mitigation Structure along Hilabangan River (Upstream of Approach B of Hilabangan Br.) Phase 2, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":125450000.0,"abc":125450000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-10-22","lat":9.97056,"lon":122.84267,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Hilabangan","wn":"Hilabangan River","wd":0.08,"wp":[9.97123,122.84257],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4604},{"i":6038,"cid":"23FE0081","pid":"P00726972LZ","t":"Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Tinalmud Viejo, Pasacao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139925000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-02-21","lat":13.518799,"lon":123.009913,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caranan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4605},{"i":6039,"cid":"23FE0071","pid":"P00742205LZ","t":"Construction of Riverbank Protection Structures along Bicol River, Brgy. Malbong, Gainza, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":74250000.0,"abc":74250000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-11-21","lat":13.614997,"lon":123.130618,"sm":560,"fm":560,"tm":560,"am":560,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.07,"wp":[13.61554,123.13033],"wst":"matched","br":"Malbong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4606},{"i":6040,"cid":"23FD0010","pid":"P00740490LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Bagangan Sr. Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024118.17,"abc":82024119.28,"fy":"2023","sd":"04/19/2023","cd":"2023-12-05","lat":13.835435,"lon":122.905255,"sm":832,"fm":1464,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.83556,122.90567],"wst":"matched","br":"Bagangan Sr. Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.09,"text":"The record contradicts itself: the title and the pin point to Lupi, Camarines Sur, but the municipality field names Sipocot, Camarines Sur, 3 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":481},{"i":6041,"cid":"22HO0074","pid":"P00633012VS","t":"Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Sto Niño, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999955.8,"abc":48999955.8,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.631725,"lon":123.324361,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto Niño","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4607},{"i":6042,"cid":"24GL0047","pid":"P00820270VS","t":"Construction of Binalbagan River Bank Slope Protection at Barangay Canmuros, Binalbagan, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":88258900.0,"abc":88258900.0,"fy":"2024","sd":"02/14/2024","cd":"2024-10-22","lat":10.211391,"lon":122.84371,"sm":204,"fm":204,"tm":204,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.06,"wp":[10.21186,122.84353],"wst":"matched","br":"Canmuros","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4608},{"i":6043,"cid":"23HL0037","pid":"P00721848VS","t":"Construction of Pagtigaon River Control, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"H.L.J CONSTRUCTION & ENTERPRISES","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-10-03","lat":9.35028,"lon":122.845,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Pagtigaon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4609},{"i":6044,"cid":"22G00059","pid":"P00620305VS","t":"Construction of Su-ay River Bank Slope Protection (Upstream of Su-ay Parallel Br.) along Bacolod South Road (Left Bank), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF HIMAMAYLAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":33774997.7,"abc":33775000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-11-01","lat":10.051761,"lon":122.847428,"sm":389,"fm":389,"tm":null,"am":389,"md":0.0,"ls":"inside","ww":"Su-ay","wn":"Suay River","wd":0.02,"wp":[10.05168,122.84723],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4610},{"i":6045,"cid":"22GL0041","pid":"P00630644VS","t":"Construction of Su-ay Riverbank Slope Protection (Upstream/left bank of Su-ay Bridge) along Bacolod South Rd. Barangay Su-ay, Himamaylan City, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF HIMAMAYLAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-12","lat":10.04971,"lon":122.84763,"sm":389,"fm":389,"tm":389,"am":389,"md":0.0,"ls":"inside","ww":"Su-ay","wn":"Suay River","wd":0.01,"wp":[10.04959,122.84759],"wst":"matched","br":"Su-ay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4611},{"i":6046,"cid":"23F00232","pid":"P00737375LZ","t":"Construction of Flood Mitigation Structure, San Lorenzo Ruiz, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":6715990.86,"abc":6929992.33,"fy":"2023","sd":"07/07/2023","cd":"2023-11-24","lat":14.0141,"lon":122.8501,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4612},{"i":6047,"cid":"22FC0216","pid":"P00620304LZ","t":"Construction/ Improvement of Slope Protection along Roy Padilla Highway, San Lorenzo Ruiz, Camarines Norte","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION / 128 DRAGON CONSTRUCTION AND SUPPLIES","c":86849987.78,"abc":86849987.78,"fy":"2022","sd":"07/14/2022","cd":"2023-12-26","lat":14.013327,"lon":122.850447,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4613},{"i":6048,"cid":"22GH0028","pid":"P00620005VS","t":"Construction of Flood Control Structure, Barotac Viejo River, Sta. 4 + 324.44 - Sta. 3 + 514.1, Brgy. Natividad, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC. / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-07-04","lat":11.022971,"lon":122.850937,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":"Barotac Viejo","wn":"Barotac Viejo River","wd":0.02,"wp":[11.02309,122.85076],"wst":"matched","br":"Natividad","len":810.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4614},{"i":6049,"cid":"24GH0043","pid":"P00820166VS","t":"Construction of Flood Control Structure, Barangay Natividad, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":44100000.0,"abc":44100000.0,"fy":"2024","sd":"01/30/2024","cd":"2025-03-10","lat":11.02349,"lon":122.85145,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Natividad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4615},{"i":6050,"cid":"24GH0077","pid":"P00820169VS","t":"Construction of Flood Control Structure, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"SBF CONSTRUCTION & DEVELOPMENT CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-12-21","lat":11.02307,"lon":122.85184,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Ilawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4616},{"i":6051,"cid":"22GH0034","pid":"P00620004VS","t":"Construction of Flood Control Structure, Barotac Viejo River, Sta. 4 + 343.41 - Sta. 3 + 528.6, Brgy. Poblacion Ilawod, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"MRZA CONSTRUCTION CORPORATION / ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-10-09","lat":11.02303,"lon":122.851916,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":"Barotac Viejo","wn":"Barotac Viejo River","wd":0.02,"wp":[11.02322,122.85193],"wst":"matched","br":"Poblacion Ilawod","len":814.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4617},{"i":6052,"cid":"21GH0035","pid":"P00521539VS","t":"Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 528.6 - Sta. 2 + 881.44","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo 3rd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"05/24/2021","cd":"2022-09-28","lat":11.027706,"lon":122.852156,"sm":635,"fm":null,"tm":635,"am":169,"md":40.42,"ls":"outside","ww":"Barotac Viejo","wn":"Barotac Viejo River","wd":0.03,"wp":[11.02766,122.85188],"wst":"matched","br":"Poblacion Ilawod","len":647.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":40.42,"text":"The pin is 40.4 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Barotac Viejo, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":129},{"i":6053,"cid":"23GN0059","pid":"P00721935VS","t":"Construction of Flood Mitigation Structure along Tibsok River, Municipality of San Enrique, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN ENRIQUE (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":29047198.6,"abc":29399998.33,"fy":"2023","sd":"04/11/2023","cd":"2023-11-15","lat":10.4094,"lon":122.8522,"sm":1267,"fm":1267,"tm":1267,"am":1267,"md":0.0,"ls":"inside","ww":"Tibsok","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4618},{"i":6054,"cid":"23GH0048","pid":"P00721467VS","t":"Construction of Flood Mitigation Structure, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":86464000.0,"abc":86464000.0,"fy":"2023","sd":"02/17/2023","cd":"2024-05-20","lat":11.021629,"lon":122.853181,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Ilawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4619},{"i":6055,"cid":"24GH0019","pid":"P00820167VS","t":"Construction of Flood Control Structure, Barangay Nueva Sevilla, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"TOPMOST DEVELOPMENT & MKTG. CORP.","c":44100000.0,"abc":44100000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-11-10","lat":11.02162,"lon":122.85381,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nueva Sevilla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4620},{"i":6056,"cid":"24FC0036","pid":"P00839668LZ","t":"Construction of Drainage Canal, Barangay Mampungo, Paracale, Camarines Norte","w":"Construction of Drainage Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"PARACALE (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY","c":4949995.1,"abc":4949995.1,"fy":"2024","sd":"04/05/2024","cd":"2024-09-16","lat":14.23523,"lon":122.85488,"sm":1101,"fm":1101,"tm":1101,"am":1101,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mampungo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4621},{"i":6057,"cid":"23FC0050","pid":"P00736149LZ","t":"Construction of Flood Control Structure, Brgy. Bakiad - Brgy. Gumamela, Phase II, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":57332639.72,"abc":57899576.25,"fy":"2023","sd":"05/03/2023","cd":"2024-05-12","lat":14.16701,"lon":122.85657,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bakiad","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4622},{"i":6058,"cid":"23GH0049","pid":"P00721468VS","t":"Construction of Flood Mitigation Structure, Barangay Natividad, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":86464000.0,"abc":86464000.0,"fy":"2023","sd":"02/17/2023","cd":"2024-05-20","lat":11.020926,"lon":122.85696,"sm":169,"fm":169,"tm":169,"am":169,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Natividad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4623},{"i":6059,"cid":"22FC0040","pid":"P00631395LZ","t":"Construction of Flood Control Structure of Brgy. Bakiad, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":33271379.32,"abc":34299914.41,"fy":"2022","sd":"03/23/2022","cd":"2023-01-08","lat":14.167397,"lon":122.857672,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bakiad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4624},{"i":6060,"cid":"24JD0016","pid":"P00820391MN","t":"Construction of Flood Control Structure along Palandok River at Polandok Br. (Downstream - Salug Side), Salug, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SALUG (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":44100000.0,"abc":44100000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-12","lat":8.13964,"lon":122.8579,"sm":1243,"fm":1243,"tm":1243,"am":1243,"md":0.0,"ls":"inside","ww":"Palandok","wn":"Palandok River","wd":0.07,"wp":[8.1399,122.85845],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4625},{"i":6061,"cid":"22GN0036","pid":"P00620109VS","t":"Construction of Flood Control Structure along Tibsok River, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN ENRIQUE (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":48960615.25,"abc":48999996.56,"fy":"2022","sd":"02/10/2022","cd":"2023-01-02","lat":10.4025,"lon":122.8589,"sm":1267,"fm":1267,"tm":null,"am":1267,"md":0.0,"ls":"inside","ww":"Tibsok","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4626},{"i":6062,"cid":"24JD0008","pid":"P00820004MN","t":"Construction of Flood Control Structure along Palandok River (Downstream) Sta. 0+000.00 - Sta. 0+400.00, Leon Postigo, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LEON T. POSTIGO (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"F.A. TORRES CONSTRUCTION / R.B. MORALLO CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/24/2024","cd":"2025-01-22","lat":8.14058,"lon":122.85964,"sm":null,"fm":null,"tm":null,"am":100,"md":null,"ls":"unknown","ww":"Palandok","wn":"Palandok River","wd":0.01,"wp":[8.14057,122.85958],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":142},{"i":6063,"cid":"22GH0080","pid":"P00633217VS","t":"Construction of Seawall, Brgy San Roque, Barotac Viejo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC VIEJO (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"1 BEATUS BUILDERS CORP. / A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":49500000.0,"abc":49500000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-04-17","lat":11.024916,"lon":122.86306,"sm":169,"fm":169,"tm":169,"am":169,"md":0.14,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4627},{"i":6064,"cid":"24GN0024","pid":"P00820309VS","t":"Construction of River Bank Protection along San Juan River, Pontevedra, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"PONTEVEDRA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"R.A. CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: R.A. CONSTRUCTION & GENERAL MERCHANDISE) / ONE TERRA BUILDERS AND CONSTRUCTION SUPPLY","c":96400918.4,"abc":96499998.56,"fy":"2024","sd":"03/11/2024","cd":"2025-02-23","lat":10.37531,"lon":122.86326,"sm":1161,"fm":1161,"tm":1161,"am":1161,"md":0.0,"ls":"inside","ww":"San Juan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4628},{"i":6065,"cid":"22GN0002","pid":"P00620110VS","t":"Construction of flood mitigation structures along Marayo River, Pontevedra, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"PONTEVEDRA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48925761.61,"abc":48999995.34,"fy":"2022","sd":"02/10/2022","cd":"2022-10-08","lat":10.377522,"lon":122.865187,"sm":1161,"fm":1161,"tm":1161,"am":1161,"md":0.0,"ls":"inside","ww":"Marayo","wn":"Marayo River","wd":0.04,"wp":[10.37774,122.86489],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4629},{"i":6066,"cid":"22GN0064","pid":"P00633219VS","t":"Construction of Bank Protection Structure along Ayungon River, Valladolid, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"VALLADOLID (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48784339.51,"abc":48999990.8,"fy":"2022","sd":"03/31/2022","cd":"2022-09-27","lat":10.44349,"lon":122.866,"sm":1623,"fm":1623,"tm":1623,"am":1623,"md":0.0,"ls":"inside","ww":"Ayungon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4630},{"i":6067,"cid":"23GN0073","pid":"P00733692VS","t":"Construction of Flood Mitigation Structures along Bago River-Cavan-Culo Section (Phase 1), Brgy. Culo and Brgy. Tapong, Pulupandan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"PULUPANDAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"FOUR SG ENTERPRISES / WILKINSON CONSTRUCTION","c":98999701.5,"abc":98999990.35,"fy":"2023","sd":"04/26/2023","cd":"2024-04-19","lat":10.4433,"lon":122.8664,"sm":1183,"fm":1183,"tm":1183,"am":1623,"md":6.31,"ls":"outside","ww":"Bago","wn":"Bago River","wd":6.43,"wp":[10.50086,122.87484],"wst":"matched","br":"Culo","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":73,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.31,"text":"The pin is 6.3 km outside Pulupandan, Negros Occidental, the nearest municipality the record claims. It falls in Valladolid, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.43,"text":"The title names Bago, which OpenStreetMap maps through the stated municipality, but the pin is 6.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":39},{"i":6068,"cid":"22F00032","pid":"P00620318LZ","t":"Construction/Improvement of Labo River Flood Mitigation Structure, Brgy. Bakiad, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":133128606.1,"abc":133128651.8,"fy":"2022","sd":"03/24/2022","cd":"2023-06-01","lat":14.175072,"lon":122.866469,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":0.06,"wp":[14.17489,122.86695],"wst":"matched","br":"Bakiad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4631},{"i":6069,"cid":"23FC0049","pid":"P00736151LZ","t":"Construction of Flood Control Structure along Busig-on River (Downstream) Phase II, Brgy. Sta. Cruz, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":57279912.51,"abc":57899410.67,"fy":"2023","sd":"05/03/2023","cd":"2024-05-01","lat":14.17883,"lon":122.86715,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Busig-on","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Cruz","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4632},{"i":6070,"cid":"24FD0036","pid":"P00823605LZ","t":"Construction of Flood Mitigation Structure along Colacling River, Colacling, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"RAPIDWORKZ CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":96494270.23,"abc":96499676.3,"fy":"2024","sd":"03/25/2024","cd":"2024-06-04","lat":13.771538,"lon":122.867458,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Colacling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4633},{"i":6071,"cid":"24FD0040","pid":"P00823621LZ","t":"Construction of Riverbank Protection Structure along Colacling River Zone 1, Barangay Colacling, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":94386023.3,"abc":96499359.27,"fy":"2024","sd":"03/27/2024","cd":"2024-09-18","lat":13.7717,"lon":122.867458,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Colacling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Colacling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4634},{"i":6072,"cid":"24FD0037","pid":"P00823604LZ","t":"Construction of Flood Mitigation Structure along Colacling River, Bulawan Jr., Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"RAPIDWORKZ CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":96494439.77,"abc":96499370.81,"fy":"2024","sd":"03/25/2024","cd":"2024-06-04","lat":13.771217,"lon":122.867539,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Colacling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4635},{"i":6073,"cid":"22FE0036","pid":"P00620713LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Tinalmud Nuevo, Libmanan, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"CPR CONSTRUCTION AND SUPPLY, INC. (FORMERLY: CPR CONSTRUCTION AND SUPPLY) / 417 LP CONSTRUCTION CORPORATION","c":47972884.0,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-09-16","lat":13.6023,"lon":122.8681,"sm":781,"fm":781,"tm":781,"am":781,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinalmud Nuevo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4636},{"i":6074,"cid":"24FD0038","pid":"P00823620LZ","t":"Construction of Riverbank Protection Structure along Colacling River (Downstream), Barangay Bulawan Jr., Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":94450662.0,"abc":96499767.64,"fy":"2024","sd":"03/27/2024","cd":"2024-08-14","lat":13.77119,"lon":122.86828,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Colacling","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bulawan Jr","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4637},{"i":6075,"cid":"23F00237","pid":"P00737374LZ","t":"Construction of Flood Mitigation Structure, San Vicente, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN VICENTE (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":6708694.75,"abc":6929998.18,"fy":"2023","sd":"07/07/2023","cd":"2023-09-25","lat":14.1062,"lon":122.8698,"sm":1362,"fm":1362,"tm":1362,"am":1362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4638},{"i":6076,"cid":"23HL0023","pid":"P00721690VS","t":"Rehabilitation of damaged Seawall along Dumaguete South Road, K0092 + 300 - K0092 + 363, Sitio Nagbagang, Barangay Poblacion, Sta. Catalina, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":5314540.0,"abc":5314540.0,"fy":"2023","sd":"02/15/2023","cd":"2023-06-02","lat":9.323611,"lon":122.87,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":592},{"i":6077,"cid":"22FC0096","pid":"P00631406LZ","t":"Construction of Labo River Control (Singi Section) Barangay Singi, Vinzons, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"VINZONS (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":40876698.39,"abc":42139800.68,"fy":"2022","sd":"03/23/2022","cd":"2022-11-23","lat":14.198992,"lon":122.870397,"sm":1639,"fm":1639,"tm":1639,"am":1639,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":2.47,"wp":[14.17688,122.86744],"wst":"matched","br":"Singi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4639},{"i":6078,"cid":"22HL0078","pid":"P00633022VS","t":"Construction of River Control Structure, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-01","lat":9.32667,"lon":122.87111,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4640},{"i":6079,"cid":"23HL0022","pid":"P00721689VS","t":"Rehabilitation of damaged Seawall along Dumaguete South Road, K0092 + 4000 - K0092 + 443; K0092 + 468 - K0092 + 524, Sitio Nagbagang, Barangay Poblacion, Sta. Catalina, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":9069900.0,"abc":9069900.0,"fy":"2023","sd":"02/15/2023","cd":"2023-07-14","lat":9.322778,"lon":122.871111,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4641},{"i":6080,"cid":"23F00254","pid":"P00736153LZ","t":"Construction of Comprehensive Drainage System of San Vicente, San Vicente, Camarines Norte","w":"Construction of Drainage Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN VICENTE (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"INFINITUM FORTUNE","c":27996855.81,"abc":28949922.0,"fy":"2023","sd":"09/22/2023","cd":"2024-04-16","lat":14.1062,"lon":122.8714,"sm":1362,"fm":1362,"tm":1362,"am":1362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4642},{"i":6081,"cid":"22FE0035","pid":"P00620714LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Tinalmud Viejo, Libmanan, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":47914650.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.5984,"lon":122.8725,"sm":781,"fm":781,"tm":781,"am":781,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinalmud Viejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4643},{"i":6082,"cid":"22HL0042","pid":"P00620320VS","t":"Rehabilitation of River Control along Sta. Catalina River Basin, Upstream B, Sta. Catalina, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":47804400.0,"abc":47804400.0,"fy":"2022","sd":"03/07/2022","cd":"2022-10-13","lat":9.32806,"lon":122.87306,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Sta. Catalina","wn":"Santa Catalina River","wd":0.05,"wp":[9.32794,122.87351],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4644},{"i":6083,"cid":"22JF0010","pid":"P00620204MN","t":"Construction of Flood Control Structure along Sibuguey River (Phase XII) Siay, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"SIAY (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":76103499.33,"abc":76932940.0,"fy":"2022","sd":"02/23/2022","cd":"2023-07-13","lat":7.657293,"lon":122.874064,"sm":1440,"fm":1440,"tm":null,"am":1440,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.05,"wp":[7.65697,122.87444],"wst":"matched","br":null,"len":null,"ph":"Phase XII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4645},{"i":6084,"cid":"22GN0034","pid":"P00630210VS","t":"Construction of Flood Control Structure at Calumangan River, Brgy. Calumangan, Bago City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48568433.55,"abc":48999995.25,"fy":"2022","sd":"02/10/2022","cd":"2022-12-07","lat":10.56139,"lon":122.87861,"sm":109,"fm":109,"tm":109,"am":109,"md":0.0,"ls":"inside","ww":"Calumangan","wn":"Calumangan River","wd":0.04,"wp":[10.56157,122.87895],"wst":"matched","br":"Calumangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4646},{"i":6085,"cid":"22GN0066","pid":"P00633221VS","t":"Construction of Bank Protection Structure along Calumangan River, Bago City, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BAGO CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48794199.32,"abc":48999999.32,"fy":"2022","sd":"03/31/2022","cd":"2022-12-20","lat":10.561389,"lon":122.87889,"sm":109,"fm":109,"tm":109,"am":109,"md":0.0,"ls":"inside","ww":"Calumangan","wn":"Calumangan River","wd":0.02,"wp":[10.56146,122.87902],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4647},{"i":6086,"cid":"22GN0061","pid":"P00633220VS","t":"Construction of Bank Protection Structure along Bagonawa River, San Enrique, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN ENRIQUE (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":48642285.17,"abc":48999991.5,"fy":"2022","sd":"03/31/2022","cd":"2022-12-19","lat":10.415,"lon":122.87917,"sm":1267,"fm":1267,"tm":1267,"am":1267,"md":0.0,"ls":"inside","ww":"Bagonawa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4648},{"i":6087,"cid":"23GL0035","pid":"P00721502VS","t":"Construction of Binalbagan River Bank Slope Protection Downstream (Right Bank - Phase II) of Binalbagan Bridge along Bacolod South Road, Binalbagan, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":79130000.0,"abc":79130000.0,"fy":"2023","sd":"02/15/2023","cd":"2024-02-23","lat":10.209054,"lon":122.880084,"sm":204,"fm":204,"tm":204,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.20929,122.88008],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4649},{"i":6088,"cid":"22GL0043","pid":"P00620108VS","t":"Construction of Binalbagan Riverbank Slope (Downstream of Binalbagan Bridge) along Bacolod South Road (Right Bank), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-12-13","lat":10.21015,"lon":122.88262,"sm":204,"fm":204,"tm":null,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.01,"wp":[10.21022,122.88258],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4650},{"i":6089,"cid":"23GL0038","pid":"P00721870VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream (Right Bank) of Binalbagan Bridge along Bacolod South Road, Binalbagan, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":79130000.0,"abc":79130000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-09-22","lat":10.210168,"lon":122.882882,"sm":204,"fm":651,"tm":204,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.02,"wp":[10.21033,122.8828],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.79,"text":"The record contradicts itself: the title and the pin point to Binalbagan, Negros Occidental, but the municipality field names Isabela, Negros Occidental, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":482},{"i":6090,"cid":"22GL0059","pid":"P00630642VS","t":"Construction of Grouted Rip Rap and Line Canal along Bacolod South Road, K0060+550 - K0061+300 and K0064+800 - K0065+250 with exceptions, Binalbagan, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":9899983.1,"abc":9900000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-09-13","lat":10.20924,"lon":122.8829,"sm":204,"fm":204,"tm":204,"am":204,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4651},{"i":6091,"cid":"22FE0034","pid":"P00620715LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Tinalmud, Pasacao, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":48020996.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.588745,"lon":122.882936,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinalmud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4652},{"i":6092,"cid":"22HL0037","pid":"P00620316VS","t":"Rehabilitation of Manalongon River Control, Upstream B, Sta. Catalina, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":33310200.0,"abc":33310200.0,"fy":"2022","sd":"03/08/2022","cd":"2022-12-13","lat":9.22444,"lon":122.88306,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Manalongon","wn":"Manalongon River","wd":0.01,"wp":[9.22436,122.88307],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4653},{"i":6093,"cid":"21GL0073","pid":"P00549970VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan Br.) along Bacolod-South Road, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":null,"deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / KWIKBUILT DEVELOPMENT CORPORATION","c":96499989.34,"abc":98000000.0,"fy":"2021","sd":"10/20/2021","cd":"2022-07-14","lat":10.21119,"lon":122.88396,"sm":null,"fm":null,"tm":null,"am":204,"md":null,"ls":"unknown","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.21088,122.88402],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":143},{"i":6094,"cid":"22FC0119","pid":"P00631412LZ","t":"Construction of San Nicolas River Control Structure, Brgy. Cabanbanan, San Vicente, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN VICENTE (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":42139953.11,"abc":42139998.47,"fy":"2022","sd":"03/24/2022","cd":"2022-11-24","lat":14.111939,"lon":122.884331,"sm":1362,"fm":1362,"tm":1362,"am":1362,"md":0.0,"ls":"inside","ww":"San Nicolas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabanbanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4654},{"i":6095,"cid":"22HL0036","pid":"P00620315VS","t":"Rehabilitation of Manalongon River Control, Upstream A, Sta. Catalina, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":45927700.0,"abc":45927700.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-27","lat":9.22222,"lon":122.88444,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Manalongon","wn":"Manalongon River","wd":0.01,"wp":[9.22228,122.88435],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4655},{"i":6096,"cid":"23HL0012","pid":"P00721849VS","t":"Construction of Manalongon River Control, Upstream A, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-12-27","lat":9.225,"lon":122.885,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Manalongon","wn":"Manalongon River","wd":0.0,"wp":[9.22499,122.88497],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4656},{"i":6097,"cid":"23GL0076","pid":"P00733694VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan Bridge along Bacolod South Road, Brgy. San Jose (Phase IV, Right Bank) Binalbagan, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-12-18","lat":10.210352,"lon":122.885552,"sm":204,"fm":204,"tm":null,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.21061,122.88572],"wst":"matched","br":"San Jose","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4657},{"i":6098,"cid":"23GL0062","pid":"P00733693VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan Bridge along Bacolod South Road, Brgy. Palayog (Phase IV, Left Bank) Hinigaran, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"HINIGARAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":98993348.2,"abc":99000000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-12-13","lat":10.210432,"lon":122.88658,"sm":622,"fm":622,"tm":null,"am":622,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.05,"wp":[10.21014,122.8862],"wst":"matched","br":"Palayog","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4658},{"i":6099,"cid":"22FC0112","pid":"P00631401LZ","t":"Construction of Flood Control, Barangay Dagotdotan, San Lorenzo Ruiz, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":40884642.31,"abc":42139690.8,"fy":"2022","sd":"03/21/2022","cd":"2022-11-21","lat":14.059333,"lon":122.892647,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dagotdotan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4659},{"i":6100,"cid":"22FC0208","pid":"P00640467LZ","t":"Construction of Flood Control Structure, Brgy. Dagotdotan, San Lorenzo Ruiz, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":98999782.58,"abc":98999782.58,"fy":"2022","sd":"03/31/2022","cd":"2023-04-30","lat":14.06283,"lon":122.89535,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dagotdotan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4660},{"i":6101,"cid":"22HL0094","pid":"P00632034VS","t":"Construction of San Francisco River Control, Sta Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49500000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-01-09","lat":9.18444,"lon":122.89889,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"San Francisco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":776},{"i":6102,"cid":"22FC0084","pid":"P00631405LZ","t":"Construction of Flood Mitigation Structure, Barangay III, Vinzons, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"VINZONS (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":40876171.84,"abc":42139949.97,"fy":"2022","sd":"03/21/2022","cd":"2023-03-26","lat":14.177617,"lon":122.902842,"sm":1639,"fm":1639,"tm":1639,"am":1639,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4661},{"i":6103,"cid":"23F00235","pid":"P00737373LZ","t":"Construction of Flood Mitigation Structure, Vinzons, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"VINZONS (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":6721290.85,"abc":6929996.82,"fy":"2023","sd":"07/07/2023","cd":"2023-08-18","lat":14.1751,"lon":122.903,"sm":1639,"fm":1639,"tm":1639,"am":1639,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4662},{"i":6104,"cid":"22FC0164","pid":"P00632953LZ","t":"Construction of Flood Mitigation Structure, Barangay Gabon Creek, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"888RV CONSTRUCTION AND SUPPLIES","c":4800384.14,"abc":4949304.31,"fy":"2022","sd":"03/21/2022","cd":"2022-07-25","lat":14.12865,"lon":122.903401,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":"Barangay Gabon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gabon Creek","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4663},{"i":6105,"cid":"23F00241","pid":"P00737376LZ","t":"Construction of Flood Mitigation Structure, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":6929991.41,"abc":6929991.41,"fy":"2023","sd":"07/07/2023","cd":"2023-09-20","lat":14.1289,"lon":122.9036,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4664},{"i":6106,"cid":"22FC0246","pid":"P00640466LZ","t":"Construction of Flood Clontrol Structure, Barangay San Antonio, San Lorenzo Ruiz (Phase II), Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION / BRENTMIN ROOFING ENTERPRISE","c":98999876.01,"abc":98999968.07,"fy":"2022","sd":"03/25/2022","cd":"2022-08-12","lat":13.941536,"lon":122.904225,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4665},{"i":6107,"cid":"24JF0011","pid":"P00820243MN","t":"Construction of Riverwall along the Sibuguey River, Barangay Minsulao to Barangay Paruk (Phase II), Siay, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":58599948.87,"abc":67550000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-09-30","lat":7.72249,"lon":122.9543,"sm":1440,"fm":647,"tm":1440,"am":1440,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.04,"wp":[7.72234,122.95461],"wst":"matched","br":"Minsulao","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":33.96,"text":"The record contradicts itself: the title and the pin point to Siay, Zamboanga Sibugay, but the municipality field names Ipil, Zamboanga Sibugay, 34 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":504},{"i":6108,"cid":"23GG0052","pid":"P00721932VS","t":"Construction of Flood Control/Slope Protection along Suage River, Brgy. Calmay, Janiuay, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MINA (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"J.C. ALBASON BUILDERS AND SUPPLY","c":18619962.5,"abc":19600000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-20","lat":10.979241,"lon":122.435706,"sm":663,"fm":976,"tm":663,"am":663,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.0,"wp":[10.97924,122.43571],"wst":"matched","br":"Calmay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":13.66,"text":"The record contradicts itself: the title and the pin point to Janiuay, Iloilo, but the municipality field names Mina, Iloilo, 14 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":610},{"i":6109,"cid":"22HO0075","pid":"P00633011VS","t":"Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Poblacion II, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999992.92,"abc":48999992.92,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.661951,"lon":123.324632,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion II","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4666},{"i":6110,"cid":"22HL0077","pid":"P00633019VS","t":"Construction of Omanod River Control Structure, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-03-08","lat":9.16722,"lon":122.90528,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Omanod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4667},{"i":6111,"cid":"22HK0089","pid":"P00642545VS","t":"Repair/Rehabilitation of Cogon Flood Control, Barangay San Jose, Tanjay City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF TANJAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: R.E. SINGSON CONSTRUCTION)","c":14475000.0,"abc":14475000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-22","lat":9.50736,"lon":123.13206,"sm":431,"fm":431,"tm":431,"am":431,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4668},{"i":6112,"cid":"24GA0134","pid":"P00821039VS","t":"Rehabilitation of Seawall at the Sites of Sampaguita Gardens, Barangay Poblacion, New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"GREENLAND BUILDERS","c":29399990.42,"abc":29400000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-10-10","lat":11.648075,"lon":122.437729,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4669},{"i":6113,"cid":"23GL0072","pid":"P00733231VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Alicante Bridge along Jct. Bagonawa-La Castellana-Isabela Road, Barangay Bungahin, (Phase IV, Right Bank), Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-02-11","lat":10.24507,"lon":123.010065,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.04,"wp":[10.24531,123.00979],"wst":"matched","br":"Bungahin","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4670},{"i":6114,"cid":"22FC0140","pid":"P00630995LZ","t":"Rehabilitation of Laniton Flood Control Structures of Laniton Bridge in Barangay Laniton, Basud, Camarines Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / ARIK CONSTRUCTION","c":50158065.88,"abc":50179228.24,"fy":"2022","sd":"03/22/2022","cd":"2022-10-05","lat":14.055856,"lon":122.95505,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Laniton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4671},{"i":6115,"cid":"23HO0026","pid":"P00721521VS","t":"Construction of Revetment Wall at Sitio Luwak - Sitio Parale, Brgy. Salmeron - Brgy. Sorsogon, Malabuyoc, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"SANTECH  BUILDERS CORPORATION / GICAR CONSTRUCTION, INC.","c":96304510.15,"abc":96305224.08,"fy":"2023","sd":"02/08/2023","cd":"2023-11-17","lat":9.650858,"lon":123.324776,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salmeron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4672},{"i":6116,"cid":"22GF0109","pid":"P00632996VS","t":"Construction of Buluangan River Control, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOOD FORTUNE INTERNATIONAL, INC.","c":9784658.85,"abc":9800000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-02-05","lat":10.732217,"lon":122.306323,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Buluangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4673},{"i":6117,"cid":"24HJ0104","pid":"P00820863VS","t":"Construction of Flood Control Structure along Manjuyod River (Upstream and Downstream), Manjuyod, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MANJUYOD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-12-11","lat":9.6742,"lon":123.132702,"sm":920,"fm":920,"tm":920,"am":920,"md":0.0,"ls":"inside","ww":"Manjuyod","wn":"Manjuyod River","wd":0.17,"wp":[9.67307,123.13372],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4674},{"i":6118,"cid":"24FF0013","pid":"P00839669LZ","t":"Construction of Flood Mitigation Structure, Barangay Sua, Canaman, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4897900.0,"abc":4949941.58,"fy":"2024","sd":"02/22/2024","cd":"2024-04-18","lat":13.620452,"lon":123.135872,"sm":317,"fm":317,"tm":317,"am":317,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4675},{"i":6119,"cid":"23HJ0064","pid":"P00721951VS","t":"Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"RCODE BUILDERS AND AGGREGATES SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/07/2023","cd":"2023-12-27","lat":9.78291,"lon":123.13598,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4676},{"i":6120,"cid":"22HJ0016","pid":"P00620141VS","t":"Construction of Flood Control along Manjuyod River, Sta. 0+000 - Sta. 0+480 (RS, US), Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MANJUYOD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/08/2022","cd":"2023-07-09","lat":9.673,"lon":123.13845,"sm":920,"fm":920,"tm":null,"am":920,"md":0.0,"ls":"inside","ww":"Manjuyod","wn":"Manjuyod River","wd":0.01,"wp":[9.67306,123.13843],"wst":"matched","br":null,"len":480.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4677},{"i":6121,"cid":"22F00099","pid":"P00620724LZ","t":"Construction of Flood Mitigation Structure, Camaligan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CAMALIGAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":43419755.29,"abc":43419755.29,"fy":"2022","sd":"03/24/2022","cd":"2022-10-05","lat":13.619739,"lon":123.139264,"sm":314,"fm":314,"tm":314,"am":314,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4678},{"i":6122,"cid":"22HJ0099","pid":"P00642566VS","t":"Repair/Rehabilitation/Reconstruction of Flood Control along Tampocon River (Upstream)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"AYUNGON (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"GRAM CONSTRUCTION AND SUPPLY","c":2845757.02,"abc":2845757.02,"fy":"2022","sd":"06/06/2022","cd":"2022-07-23","lat":9.850289,"lon":123.139696,"sm":85,"fm":85,"tm":null,"am":85,"md":0.0,"ls":"inside","ww":"Tampocon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4679},{"i":6123,"cid":"24HJ0020","pid":"P00820205VS","t":"Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"RCODE BUILDERS AND AGGREGATES SUPPLY","c":18800000.0,"abc":18963000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-13","lat":9.779824,"lon":123.140849,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4680},{"i":6124,"cid":"23FD0016","pid":"P00736095LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Haluban Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024753.5,"abc":82024836.59,"fy":"2023","sd":"03/31/2023","cd":"2023-11-17","lat":13.835448,"lon":122.90537,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.03,"wp":[13.83554,122.90568],"wst":"matched","br":"Haluban Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4681},{"i":6125,"cid":"22GP0046","pid":"P00620299VS","t":"Construction of River Control along Panay River Basin, Brgy. Dolores, Dumalag, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMALAG (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":42627858.0,"abc":42627866.39,"fy":"2022","sd":"02/15/2022","cd":"2023-11-28","lat":11.28156,"lon":122.60169,"sm":535,"fm":535,"tm":535,"am":535,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.03,"wp":[11.28177,122.60152],"wst":"matched","br":"Dolores","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4682},{"i":6126,"cid":"23FE0069","pid":"P00727324LZ","t":"Construction of Flood Control along Bicol River, Brgy. District II, Gainza, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-02-08","lat":13.618904,"lon":123.141057,"sm":560,"fm":560,"tm":560,"am":560,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.06,"wp":[13.61945,123.14098],"wst":"matched","br":"District II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4683},{"i":6127,"cid":"22HJ0037","pid":"P00620021VS","t":"Construction of Flood Control along Talaptap River, Sta. 0+000 - Sta. 0+600 (BS, US), Brgy. Cabugan, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":72375000.0,"abc":72375000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-11","lat":9.750412,"lon":123.142569,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":"Talaptap","wn":"Talaptap River","wd":0.03,"wp":[9.75014,123.14265],"wst":"matched","br":"Cabugan","len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4684},{"i":6128,"cid":"24HJ0022","pid":"P00820198VS","t":"Construction of Flood Control along Domolog River, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MOLROW CONSTRUCTION & SUPPLY","c":30506420.0,"abc":30506420.0,"fy":"2024","sd":"03/07/2024","cd":"2024-12-12","lat":9.766334,"lon":123.142662,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":"Domolog","wn":"Domolong River","wd":0.01,"wp":[9.76625,123.14269],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4685},{"i":6129,"cid":"22FF0043","pid":"P00621523LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure,Peñafrancia Creek, Brgy. Del Rosario, Naga City (Left Side)","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PHILWORKS CONSTRUCTION & SUPPLY","c":76604250.86,"abc":77081758.13,"fy":"2022","sd":"04/04/2022","cd":"2022-10-12","lat":13.62007,"lon":123.24089,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":"Peñafrancia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Del Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4686},{"i":6130,"cid":"22HJ0098","pid":"P00642565VS","t":"Repair/Rehabilitation/Reconstruction of Flood Control along Manjuyod River (Upstream) Brgy Sta Monica, Manjuyod, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MANJUYOD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":39907110.08,"abc":39907110.08,"fy":"2022","sd":"06/06/2022","cd":"2023-01-20","lat":9.671861,"lon":123.143093,"sm":920,"fm":920,"tm":920,"am":920,"md":0.0,"ls":"inside","ww":"Manjuyod","wn":"Manjuyod River","wd":0.01,"wp":[9.67188,123.14305],"wst":"matched","br":"Sta Monica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4687},{"i":6131,"cid":"23HJ0050","pid":"P00721789VS","t":"Construction of Flood Control Structure along Manjuyod River, Manjuyod, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MANJUYOD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"02/07/2023","cd":"2023-12-27","lat":9.672769,"lon":123.143494,"sm":920,"fm":920,"tm":920,"am":920,"md":0.0,"ls":"inside","ww":"Manjuyod","wn":"Manjuyod River","wd":0.01,"wp":[9.6727,123.14358],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4688},{"i":6132,"cid":"24FF0041","pid":"P00820475LZ","t":"Construction of Flood Mitigation Structure at Barangay Dominorog, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96344723.24,"abc":96499807.55,"fy":"2024","sd":"04/08/2024","cd":"2024-10-11","lat":13.715814,"lon":123.143602,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dominorog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4689},{"i":6133,"cid":"23FF0056","pid":"P00727220LZ","t":"Construction of San Roque-Liñaga Creek Flood Control, Canaman, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":48463992.0,"abc":48999916.73,"fy":"2023","sd":"06/01/2023","cd":"2023-12-07","lat":13.66396,"lon":123.14397,"sm":317,"fm":317,"tm":317,"am":864,"md":0.0,"ls":"inside","ww":"San Roque-Liñaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4690},{"i":6134,"cid":"24HJ0083","pid":"P00820204VS","t":"Construction of Flood Control along Sitio Bliss, Barangay Poblacion, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MAI CONSTRUCTION & SUPPLY","c":19450000.0,"abc":19600000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-15","lat":9.761392,"lon":123.145569,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4691},{"i":6135,"cid":"23FE0068","pid":"P00742203LZ","t":"Construction of Riverbank Protection Structures along Bicol River, Brgy. District I, Gainza, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":74250000.0,"abc":74250000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-11-24","lat":13.619213,"lon":123.146975,"sm":560,"fm":560,"tm":560,"am":560,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.06,"wp":[13.61975,123.14675],"wst":"matched","br":"District I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4692},{"i":6136,"cid":"23HJ0059","pid":"P00721788VS","t":"Construction of Flood Control Structure along Talaptap River, Bindoy, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"02/07/2023","cd":"2024-07-21","lat":9.750335,"lon":123.149978,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":"Talaptap","wn":"Talaptap River","wd":0.02,"wp":[9.75016,123.1499],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4693},{"i":6137,"cid":"24HK0106","pid":"P00821059VS","t":"Construction of Tanjay River Control Structure, Tanjay City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF TANJAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"QM BUILDERS","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"05/29/2024","cd":"2024-12-09","lat":9.514797,"lon":123.150115,"sm":431,"fm":431,"tm":431,"am":431,"md":0.0,"ls":"inside","ww":"Tanjay","wn":"Tanjay River","wd":0.03,"wp":[9.51505,123.15005],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4694},{"i":6138,"cid":"22FE0011","pid":"P00620701LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Brgy. Cagbunga, Gainza, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48024323.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.617304,"lon":123.152578,"sm":560,"fm":560,"tm":560,"am":560,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.05,"wp":[13.61775,123.15267],"wst":"matched","br":"Cagbunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4695},{"i":6139,"cid":"22GH0093","pid":"P00642581VS","t":"Construction of Seawall along Iloilo East Coast Estancia Wharf Road, Sta. 183 + 135 - Sta. 183 + 408, Brgt. Botongon, Estancia, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ESTANCIA (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":19300000.0,"abc":19300000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-04-07","lat":11.444373,"lon":123.152792,"sm":554,"fm":554,"tm":554,"am":554,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":273.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4696},{"i":6140,"cid":"22HJ0038","pid":"P00620143VS","t":"Construction of Flood Control along Pacuan River, Sta. 0+000 - Sta. 1+000, Brgy. Pacuan, La Libertad, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"LA LIBERTAD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"KOUKEN CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-25","lat":10.076866,"lon":123.153151,"sm":719,"fm":719,"tm":719,"am":719,"md":0.0,"ls":"inside","ww":"Pacuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pacuan","len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4697},{"i":6141,"cid":"22HJ0090","pid":"P00642551VS","t":"Repair/Rehabilitation of Seawall along Dumaguete North Road, K0063+525 - K0063+584.60, Malaga, Bindoy, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BINDOY (PAYABON) (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MAI CONSTRUCTION & SUPPLY","c":3930850.34,"abc":3930850.34,"fy":"2022","sd":"06/06/2022","cd":"2022-08-11","lat":9.721909,"lon":123.156675,"sm":207,"fm":207,"tm":207,"am":207,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4698},{"i":6142,"cid":"22FE0010","pid":"P00620706LZ","t":"Construction of Dike (along Cut-Off Channel) within Bicol River Basin, Brgy. Balagbag, Milaor, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":47539836.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.585361,"lon":123.156997,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Cut-Off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balagbag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4699},{"i":6143,"cid":"23F00075","pid":"P00726630LZ","t":"Construction of Bicol River Cut-off Channel 3 Flood Mitigation Structure, Milaor, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":144268222.8,"abc":144268222.8,"fy":"2023","sd":"05/04/2023","cd":"2024-03-29","lat":13.579921,"lon":123.160761,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.57976,123.16061],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4700},{"i":6144,"cid":"23FF0036","pid":"P00726610LZ","t":"Rehabilitation of Bicol River Flood Control (San Mateo - Sitio Gogon Section), Camaligan, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CAMALIGAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":66753754.22,"abc":67520249.96,"fy":"2023","sd":"04/11/2023","cd":"2023-09-15","lat":13.619381,"lon":123.162485,"sm":314,"fm":314,"tm":314,"am":314,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.06,"wp":[13.6188,123.16254],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4701},{"i":6145,"cid":"23JC0010","pid":"P00732479MN","t":"Construction of River Control Structure, Purok 4 Sitio Magutong, Salisig, Pres. Manuel Roxas, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"PRES. MANUEL A. ROXAS (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"D' DREAMER DEVELOPMENT CORPORATION","c":4900000.27,"abc":4950000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-01-29","lat":8.473841,"lon":123.162509,"sm":1170,"fm":1170,"tm":1170,"am":1170,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4702},{"i":6146,"cid":"23HK0057","pid":"P00731624VS","t":"Construction of Shore Protection/Seawall, Brgy. 4, Tanjay City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF TANJAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"D.K. JOCSON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/23/2023","cd":"2024-03-17","lat":9.529444,"lon":123.164722,"sm":431,"fm":431,"tm":431,"am":431,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4703},{"i":6147,"cid":"23FE0066","pid":"P00742204LZ","t":"Construction of Riverbank Protection Structures along Bicol River, Brgy. Dahilig, Gainza, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":74250000.0,"abc":74250000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-10-13","lat":13.61858,"lon":123.165117,"sm":560,"fm":560,"tm":560,"am":314,"md":0.07,"ls":"boundary","ww":"Bicol","wn":"Bicol River","wd":0.06,"wp":[13.61913,123.16504],"wst":"matched","br":"Dahilig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4704},{"i":6148,"cid":"23FE0074","pid":"P00740458LZ","t":"Construction of Flood Control Structure along Cut-off Channel (Downstream), Brgy. Balagbag, Milaor, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":120625000.0,"abc":120625000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-04-12","lat":13.575883,"lon":123.167289,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balagbag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4705},{"i":6149,"cid":"23HJ0060","pid":"P00721791VS","t":"Construction of Flood Control Structure along Tibyawan River, Tayasan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"TAYASAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"02/07/2023","cd":"2024-08-25","lat":9.921418,"lon":123.167516,"sm":1554,"fm":1554,"tm":1554,"am":1554,"md":0.0,"ls":"inside","ww":"Tibyawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4706},{"i":6150,"cid":"24JG0039","pid":"P00820396MN","t":"Construction of Flood Control Project along Portion of Kumalarang River (Upstream), Purok 1, Boyugan East, Kumalarang, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"KUMALARANG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"JZL BUILDERS & ENTERPRISES","c":19579552.34,"abc":19600000.0,"fy":"2024","sd":"04/22/2024","cd":"2025-02-24","lat":7.74619,"lon":123.168055,"sm":716,"fm":716,"tm":716,"am":716,"md":0.0,"ls":"inside","ww":"Kumalarang","wn":"Kumalarang River","wd":0.03,"wp":[7.74638,123.16819],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4707},{"i":6151,"cid":"23FE0072","pid":"P00740459LZ","t":"Construction of Flood Control Structure along Cut-off Channel (Downstream), Brgy. Borongborongan, Milaor, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":120625000.0,"abc":120625000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-02-22","lat":13.574338,"lon":123.168983,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Borongborongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4708},{"i":6152,"cid":"22FF0038","pid":"P00621550LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Magarao Flood Control, (Bell-Casuray-Fundado Creek), Magarao, Camarines Sur (Both Sides)","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MAGARAO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":48099080.59,"abc":48112067.46,"fy":"2022","sd":"04/01/2022","cd":"2022-12-05","lat":13.66011,"lon":123.17228,"sm":864,"fm":864,"tm":864,"am":864,"md":0.0,"ls":"inside","ww":"Bell-Casuray-Fundado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4709},{"i":6153,"cid":"22HJ0071","pid":"P00632032VS","t":"Construction of Dike (Groin), Poblacion, Tayasan, Negros Oriental","w":"Construction of Dike","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"TAYASAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"SAGITTARIUS CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-09-13","lat":9.921398,"lon":123.173145,"sm":1554,"fm":1554,"tm":1554,"am":1554,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4710},{"i":6154,"cid":"21FF0031","pid":"P00561427LZ","t":"Construction of Slope Protection (Riprapping), Bell (Creek), Magarao, Camarines Sur","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"Magarao","deo":"Camarines Sur 3rd District Engineering Office","co":"MRBAY CONSTRUCTION","c":3959871.7,"abc":3959979.66,"fy":"2021","sd":"04/05/2022","cd":"2022-11-29","lat":13.659971,"lon":123.173667,"sm":864,"fm":null,"tm":864,"am":864,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4711},{"i":6155,"cid":"24GK0074","pid":"P00832635VS","t":"Construction of Drainage System, Barangay Patag, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SL & G CONSTRUCTION","c":4949999.85,"abc":4949994.85,"fy":"2024","sd":"02/14/2024","cd":"2024-05-07","lat":10.6975,"lon":123.173888,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4712},{"i":6156,"cid":"23FE0048","pid":"P00736100LZ","t":"Construction of Flood Control Structure (along Cut-off Channel), Brgy. San Juan-San Lorenzo, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-15","lat":13.569732,"lon":123.174251,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan-San Lorenzo","len":null,"ph":null,"dup":[6157],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 217,125,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":690},{"i":6157,"cid":"23FE0064","pid":"P00740456LZ","t":"Construction of Flood Control Structure along Cut-off Channel (Downstream) phase II, Brgy. San Juan-San Lorenzo, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":120625000.0,"abc":120625000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-31","lat":13.569732,"lon":123.174251,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan-San Lorenzo","len":null,"ph":"Phase II","dup":[6156],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 217,125,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":691},{"i":6158,"cid":"24HJ0071","pid":"P00832657VS","t":"Construction of Spill Way, Barangay Balogo, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"GRAM CONSTRUCTION AND SUPPLY","c":4935000.0,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-06-25","lat":10.121814,"lon":123.175037,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balogo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4713},{"i":6159,"cid":"23FE0058","pid":"P00740457LZ","t":"Construction of Flood Control Structure along Cut-off Channel (Downstream) phase II, Brgy. Irayang Solong, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":120625000.0,"abc":120625000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-17","lat":13.567531,"lon":123.176199,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Irayang Solong","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4714},{"i":6160,"cid":"23FE0047","pid":"P00736099LZ","t":"Construction of Flood Control Structure (along Cut-off Channel), Brgy. Irayang Solong, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":96447416.6,"abc":96500000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-17","lat":13.566304,"lon":123.17757,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Irayang Solong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4715},{"i":6161,"cid":"22HK0044","pid":"P00620049VS","t":"Reconstruction of Tugas-Polo Seawall, Tanjay City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF TANJAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"QM BUILDERS","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-11-09","lat":9.507131,"lon":123.17794,"sm":431,"fm":431,"tm":431,"am":431,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4716},{"i":6162,"cid":"22J00044","pid":"P00620010MN","t":"Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section (B00549MN) (Downstream Rightside) along Pagadian City - Zamboanga City Road (S01453MN), Brgy. Bogayo, Kumalarang, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"KUMALARANG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":82330663.39,"abc":96900000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-07-31","lat":7.78354,"lon":123.17855,"sm":716,"fm":716,"tm":716,"am":716,"md":0.0,"ls":"inside","ww":"Bogayo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bogayo","len":null,"ph":null,"dup":[6163],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 129,516,058.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":814},{"i":6163,"cid":"22J00046","pid":"P00620210MN","t":"Construction of Kumalarang River Flood Control, Kumalarang, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"KUMALARANG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":47185394.21,"abc":68008114.32,"fy":"2022","sd":"03/10/2022","cd":"2023-05-15","lat":7.78354,"lon":123.17855,"sm":716,"fm":716,"tm":716,"am":716,"md":0.0,"ls":"inside","ww":"Kumalarang","wn":"Kumalarang River","wd":0.0,"wp":[7.78354,123.17851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6162],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 129,516,058.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":975},{"i":6164,"cid":"22FE0012","pid":"P00620707LZ","t":"Construction of Dike (along Cut-Off Channel) within Bicol River Basin, Brgy. Irayang Solong, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":48024732.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.564606,"lon":123.179456,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Cut-Off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Irayang Solong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4717},{"i":6165,"cid":"24FF0072","pid":"P00846119LZ","t":"Construction of of Flood Mitigation Structure, Brgy. Mabolo, Naga City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"BENJOSH CONSTRUCTION SUPPLY","c":4889903.22,"abc":4949958.96,"fy":"2024","sd":"06/03/2024","cd":"2024-10-19","lat":13.613694,"lon":123.181585,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4718},{"i":6166,"cid":"24HL0048","pid":"P00820213VS","t":"Construction of Nasigid SRIS Drainage Canal, Zamboanguita, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"ZAMBOANGUITA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"NRS BUILDERS AND SUPPLIES","c":20778940.0,"abc":20778940.0,"fy":"2024","sd":"04/11/2024","cd":"2024-10-15","lat":9.162647,"lon":123.183378,"sm":1643,"fm":1643,"tm":1643,"am":1643,"md":0.0,"ls":"inside","ww":"Nasigid SRIS Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4719},{"i":6167,"cid":"22JB0009","pid":"P00620112MN","t":"Construction of Flood Control Structure along Left Bank of Dohinob River (Upstream and Downstream), San Antonio, Manukan, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"MANUKAN (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION","c":39408043.22,"abc":39808090.0,"fy":"2022","sd":"03/31/2022","cd":"2024-09-30","lat":8.52367,"lon":123.18436,"sm":925,"fm":925,"tm":925,"am":925,"md":0.0,"ls":"inside","ww":"Dohinob","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4720},{"i":6168,"cid":"23FE0073","pid":"P00727323LZ","t":"Construction of Flood Control along Bicol River, Brgy. San Vicente, Milaor, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-15","lat":13.600425,"lon":123.184796,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.60029,123.18468],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4721},{"i":6169,"cid":"23FE0049","pid":"P00737563LZ","t":"Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"SHLA CONSTRUCTION AND SUPPLY","c":7425000.0,"abc":7425000.0,"fy":"2023","sd":"10/17/2023","cd":"2024-02-13","lat":13.59095,"lon":123.185316,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alimbuyog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4722},{"i":6170,"cid":"22FE0009","pid":"P00620716LZ","t":"Construction of Revetment (along Bicol River) within Bicol River Basin, Brgy. Alimbuyog, Milaor, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"KCS CONSTRUCTION & SUPPLY","c":48015300.91,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.580137,"lon":123.185513,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.57982,123.18539],"wst":"matched","br":"Alimbuyog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4723},{"i":6171,"cid":"23FF0037","pid":"P00726609LZ","t":"Rehabilitation of Bicol River Flood Control (Mabolo Section), Barangay Mabolo, Naga City, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":57204819.77,"abc":57899890.26,"fy":"2023","sd":"04/11/2023","cd":"2023-12-15","lat":13.610648,"lon":123.185657,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.61076,123.18594],"wst":"matched","br":"Mabolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4724},{"i":6172,"cid":"22FF0035","pid":"P00621548LZ","t":"Construction/Rehabilitation/Improvement of  Flood Mitigation Structure, Bicol River Flood Control, Brgy. Tabuco (Tabuco Section - Left Side), Naga City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CPR CONSTRUCTION AND SUPPLY, INC. (FORMERLY: CPR CONSTRUCTION AND SUPPLY) / 417 LP CONSTRUCTION CORPORATION","c":39052245.17,"abc":39052317.69,"fy":"2022","sd":"04/06/2022","cd":"2022-11-11","lat":13.613208,"lon":123.185701,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.61316,123.18535],"wst":"matched","br":"Tabuco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4725},{"i":6173,"cid":"24HJ0065","pid":"P00820196VS","t":"Construction of Box Culvert along Vallehermoso-Canlaon City-La Castellana Rd, Canlaon, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CANLAON CITY (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"REKINA CONSTRUCTION SERVICES","c":2913716.97,"abc":2940000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-07","lat":10.372618,"lon":123.185823,"sm":323,"fm":323,"tm":323,"am":323,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4726},{"i":6174,"cid":"23HL0060","pid":"P00721955VS","t":"Construction of Drainage Canal along Dumaguete South Road, Zamboanguita, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"ZAMBOANGUITA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MG CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-07","lat":9.096389,"lon":123.186111,"sm":1643,"fm":1643,"tm":1643,"am":1643,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4727},{"i":6175,"cid":"21FF0074","pid":"P00561420LZ","t":"Construction of Drainage, San Isidro, Magarao, Camarines Sur","w":"Construction of Drainage Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"Magarao","deo":"Camarines Sur 3rd District Engineering Office","co":"LAHDETH CONSTRUCTION AND SUPPLY","c":1489100.0,"abc":1569126.32,"fy":"2021","sd":"04/05/2022","cd":"2022-07-01","lat":13.663587,"lon":123.187909,"sm":864,"fm":null,"tm":864,"am":864,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4728},{"i":6176,"cid":"22FE0027","pid":"P00631001LZ","t":"Rehabilitation of River Wall along Bicol River, Brgy. Alimbuyog, Milaor, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MILAOR (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":70926749.0,"abc":72375000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-09-15","lat":13.579908,"lon":123.18793,"sm":975,"fm":975,"tm":975,"am":975,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.5796,123.18797],"wst":"matched","br":"Alimbuyog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4729},{"i":6177,"cid":"24HL0015","pid":"P00820214VS","t":"Construction of River Control along Upstream A of Bangcolotan River, Zamboanguita, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"ZAMBOANGUITA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-08-12","lat":9.0979,"lon":123.190249,"sm":1643,"fm":1643,"tm":1643,"am":1643,"md":0.0,"ls":"inside","ww":"Bangcolotan","wn":"Bangcolotan River","wd":0.04,"wp":[9.09806,123.18997],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4730},{"i":6178,"cid":"22FI0024","pid":"P00620737LZ","t":"Construction of Poblacion Balud Seawall, Balud, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"BALUD (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"LEGACY BSCA CONSTRUCTION AND SUPPLY CORP.","c":24500000.0,"abc":24499994.04,"fy":"2022","sd":"02/11/2022","cd":"2022-07-23","lat":12.037494,"lon":123.191017,"sm":139,"fm":139,"tm":139,"am":139,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4731},{"i":6179,"cid":"22FE0032","pid":"P00620705LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Brgy. Timbang, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48019191.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.530402,"lon":123.191259,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.53052,123.19156],"wst":"matched","br":"Timbang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4732},{"i":6180,"cid":"23FF0017","pid":"P00737567LZ","t":"Construction of Flood Mitigation Structure, Sta. Cruz Quipayo, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4899993.0,"abc":4949988.14,"fy":"2023","sd":"02/17/2023","cd":"2023-04-15","lat":13.698354,"lon":123.191961,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4733},{"i":6181,"cid":"23HJ0044","pid":"P00721839VS","t":"Construction of Flood Control Structure along Pangaloan River (Upstream), Jimalalud, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"JIMALALUD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"KOUKEN CONSTRUCTION","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/07/2023","cd":"2023-10-29","lat":9.971131,"lon":123.19284,"sm":668,"fm":668,"tm":668,"am":668,"md":0.0,"ls":"inside","ww":"Pangaloan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4734},{"i":6182,"cid":"22FF0040","pid":"P00640580LZ","t":"Constrcution of Flood Mitigation Structures, Brgy. Sta Cruz Quipayo, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"417 LP CONSTRUCTION CORPORATION","c":4499725.15,"abc":4949919.99,"fy":"2022","sd":"04/01/2022","cd":"2022-09-16","lat":13.698458,"lon":123.193054,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta Cruz Quipayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4735},{"i":6183,"cid":"24FF0019","pid":"P00839670LZ","t":"Construction of Flood Mitigation Structure, Sto. Niño Quipayo, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4896762.41,"abc":4949926.97,"fy":"2024","sd":"02/22/2024","cd":"2024-04-15","lat":13.698527,"lon":123.193655,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4736},{"i":6184,"cid":"22FE0030","pid":"P00620700LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Brgy. Bagongbong, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48020707.46,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.534477,"lon":123.193924,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.53427,123.19403],"wst":"matched","br":"Bagongbong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4737},{"i":6185,"cid":"23FE0045","pid":"P00736098LZ","t":"Construction of Dike along Bicol River, Brgy. Del Carmen-Del Rosario (Phase 2), Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-17","lat":13.559758,"lon":123.193946,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.5599,123.19432],"wst":"matched","br":"Del Carmen-Del Rosario","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4738},{"i":6186,"cid":"23FE0070","pid":"P00727322LZ","t":"Construction of Flood Control along Bicol River, Brgy. Bagongbong, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":72227938.37,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-17","lat":13.538697,"lon":123.193978,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.53891,123.19428],"wst":"matched","br":"Bagongbong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4739},{"i":6187,"cid":"22FE0041","pid":"P00620702LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Brgy. Del Carmen-Del Rosario, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":47976248.09,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-09-30","lat":13.562033,"lon":123.19433,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.56187,123.19454],"wst":"matched","br":"Del Carmen-Del Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4740},{"i":6188,"cid":"24FE0021","pid":"P00821377LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Barangay Del Carmen - Del Rosario, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":133169700.0,"abc":133170000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-10-25","lat":13.558576,"lon":123.194743,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.55884,123.19505],"wst":"matched","br":"Del Carmen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4741},{"i":6189,"cid":"23FE0060","pid":"P00727383LZ","t":"Construction of Flood Control along Bicol River, Brgy. Taban, Minalabac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":48965337.45,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-18","lat":13.56109,"lon":123.194885,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.07,"wp":[13.56134,123.19428],"wst":"matched","br":"Taban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4742},{"i":6190,"cid":"23FE0044","pid":"P00736096LZ","t":"Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/01/2023","cd":"2024-02-01","lat":13.537228,"lon":123.195006,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.53733,123.19528],"wst":"matched","br":"Bagongbong","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4743},{"i":6191,"cid":"23FF0016","pid":"P00737566LZ","t":"Construction of Flood Mitigation Structure, San Antonio Quipayo, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4900002.0,"abc":4949997.19,"fy":"2023","sd":"02/17/2023","cd":"2023-04-15","lat":13.698948,"lon":123.19727,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4744},{"i":6192,"cid":"23FE0017","pid":"P00737564LZ","t":"Rehabilitation of Flood Mitigation Structure (Along Bicol River), Barangay Taban, Minalabac, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":49464968.0,"abc":49500000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-17","lat":13.556045,"lon":123.197289,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.55613,123.19712],"wst":"matched","br":"Taban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4745},{"i":6193,"cid":"21FF0029","pid":"P00561424LZ","t":"Construction of Slope Protection (Riprapping), Barangay San Antonio Quipayo ,Calabanga, Caramines Sur","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"Calabanga","deo":"Camarines Sur 3rd District Engineering Office","co":"J-NAC CONSTRUCTION & SUPPLY","c":2941315.96,"abc":2969481.12,"fy":"2021","sd":"04/06/2022","cd":"2022-08-17","lat":13.699086,"lon":123.198484,"sm":291,"fm":null,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio Quipayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4746},{"i":6194,"cid":"23HK0091","pid":"P00721953VS","t":"Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"AMLAN (AYUQUITAN) (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-21","lat":9.470934,"lon":123.198771,"sm":52,"fm":52,"tm":52,"am":52,"md":0.0,"ls":"inside","ww":"Bio-os","wn":"Bio-os River","wd":0.01,"wp":[9.47083,123.19876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4747},{"i":6195,"cid":"23HJ0063","pid":"P00721905VS","t":"Construction of Flood Control Structure along San Jose-Biga-a River, La Libertad, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"LA LIBERTAD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-12-27","lat":10.03388,"lon":123.19916,"sm":719,"fm":719,"tm":719,"am":719,"md":0.0,"ls":"inside","ww":"San Jose-Biga-a","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4748},{"i":6196,"cid":"24FI0061","pid":"P00820483LZ","t":"Construction of Flood Mitigation Structure, Barangay Mabuhay, Balud, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"BALUD (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / A3 CONSTRUCTION & SUPPLY","c":62724959.88,"abc":62724959.88,"fy":"2024","sd":"05/13/2024","cd":"2024-12-17","lat":11.939922,"lon":123.199304,"sm":139,"fm":139,"tm":139,"am":139,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4749},{"i":6197,"cid":"22HJ0028","pid":"P00620136VS","t":"Construction of Flood Control along Brgy. San Jose to Brgy. Biga-a River, Sta. 0+000 - Sta. 1+000, La Libertad, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"LA LIBERTAD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-11-05","lat":10.033978,"lon":123.199678,"sm":719,"fm":719,"tm":719,"am":719,"md":0.0,"ls":"inside","ww":"Brgy. Biga-a","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4750},{"i":6198,"cid":"22GK0132","pid":"P00620304VS","t":"Construction of Flood Control Structure of Sicaba River (Right Side - Downstream) along Bacolod North Rd, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":39089218.29,"abc":39091219.17,"fy":"2022","sd":"03/30/2022","cd":"2022-12-18","lat":10.956667,"lon":123.200278,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Sicaba","wn":"Sicaba River","wd":0.03,"wp":[10.95654,123.20055],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4751},{"i":6199,"cid":"24GK0002","pid":"P00820007VS","t":"Construction of Flood Control Structure along Sicaba River, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":57896911.64,"abc":57899987.32,"fy":"2024","sd":"03/13/2024","cd":"2024-10-24","lat":10.95639,"lon":123.2008,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Sicaba","wn":"Sicaba River","wd":0.03,"wp":[10.95651,123.20054],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4752},{"i":6200,"cid":"22GK0137","pid":"P00620303VS","t":"Construction of Flood Control Structure of Sicaba River (Left Side - Downstream) along Bacolod North Rd, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":38109219.0,"abc":38111218.31,"fy":"2022","sd":"03/30/2022","cd":"2022-12-11","lat":10.956389,"lon":123.200833,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Sicaba","wn":"Sicaba River","wd":0.03,"wp":[10.95652,123.20054],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4753},{"i":6201,"cid":"23FE0015","pid":"P00726602LZ","t":"Construction of Dike along Bicol River, Barangay Baliuag Nuevo, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-10-05","lat":13.527625,"lon":123.201373,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.52734,123.20155],"wst":"matched","br":"Baliuag Nuevo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4754},{"i":6202,"cid":"23FE0025","pid":"P00737389LZ","t":"Rehabilitation of Flood Mitigation Structure (Along Bicol River), Barangay Baliuag Viejo, Minalabac, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":69300000.0,"abc":69300000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-10-19","lat":13.520185,"lon":123.201875,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.52035,123.20156],"wst":"matched","br":"Baliuag Viejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4755},{"i":6203,"cid":"22F00068","pid":"P00620292LZ","t":"Construction of Naga City Flood Control - Upstream, Naga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":52139326.92,"abc":52139326.92,"fy":"2022","sd":"04/08/2022","cd":"2023-02-14","lat":13.635254,"lon":123.201931,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4756},{"i":6204,"cid":"24FF0059","pid":"P00846121LZ","t":"Construction of Flood Mitigation Structure (Drainage), Julian Meliton Elementary School, Concepcion Pequena, Naga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"AA PAHATI CONSTRUCTION AND SUPPLY","c":4949423.05,"abc":4949938.61,"fy":"2024","sd":"05/08/2024","cd":"2024-07-12","lat":13.617514,"lon":123.202877,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4757},{"i":6205,"cid":"22FE0018","pid":"P00620703LZ","t":"Construction of Dike (along Bicol River) within Bicol River Basin, Brgy. Magadap, Minalabac, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"MINALABAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":48015655.63,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.502646,"lon":123.20472,"sm":977,"fm":977,"tm":977,"am":977,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.50293,123.20489],"wst":"matched","br":"Magadap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4758},{"i":6206,"cid":"22HJ0015","pid":"P00620139VS","t":"Construction of Flood Control along La Libertad River, Sta. 0+000 - Sta. 2+250, La Libertad, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"LA LIBERTAD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":36241380.0,"abc":36241380.0,"fy":"2022","sd":"02/08/2022","cd":"2022-10-06","lat":10.05275,"lon":123.20794,"sm":719,"fm":719,"tm":719,"am":719,"md":0.0,"ls":"inside","ww":"La Libertad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":2250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4759},{"i":6207,"cid":"23FF0055","pid":"P00737565LZ","t":"Construction of Flood Mitigation Structure (Drainage) from Del Carmen to Sta. Isabel, Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4897585.84,"abc":4949196.27,"fy":"2023","sd":"06/13/2023","cd":"2023-09-28","lat":13.707846,"lon":123.213519,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4760},{"i":6208,"cid":"22FF0037","pid":"P00621549LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Calabanga Flood Control, Brgy. Sabang-Salvacion Baybay- San Roque-San Pablo, Calabanga, Camarines Sur (Both Sides)","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PEU CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":48888375.42,"abc":48891676.39,"fy":"2022","sd":"04/04/2022","cd":"2022-10-27","lat":13.71678,"lon":123.21466,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang-Salvacion Baybay- San Roque-San Pablo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4761},{"i":6209,"cid":"22HL0080","pid":"P00632036VS","t":"Construction of Drainage Canal at Lunga, Valencia, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MG CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/19/2022","cd":"2022-12-09","lat":9.27344,"lon":123.22095,"sm":1622,"fm":1622,"tm":1622,"am":1622,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4762},{"i":6210,"cid":"23FF0046","pid":"P00727221LZ","t":"Construction of Pacol Flood Control, Brgy. Pacol, Naga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NAGA CITY (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PHILWORKS CONSTRUCTION & SUPPLY","c":48464895.49,"abc":48990141.48,"fy":"2023","sd":"05/08/2023","cd":"2023-12-19","lat":13.64795,"lon":123.22436,"sm":1003,"fm":1003,"tm":1003,"am":1003,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pacol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4763},{"i":6211,"cid":"22HL0081","pid":"P00632035VS","t":"Construction of Drainage Canal at Apolong, Valencia, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MG CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/19/2022","cd":"2023-01-12","lat":9.29083,"lon":123.22889,"sm":1622,"fm":1622,"tm":1622,"am":1622,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4764},{"i":6212,"cid":"22HL0040","pid":"P00620314VS","t":"Rehabilitation of Palinpinon River Control, Valencia, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":37240000.0,"abc":37240000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-11-04","lat":9.31417,"lon":123.22972,"sm":1622,"fm":1622,"tm":1622,"am":1622,"md":0.0,"ls":"inside","ww":"Palinpinon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4765},{"i":6213,"cid":"23FN0009","pid":"P00736106LZ","t":"Rehabiltation of Luluwasan Flood Control Structure (Phase 2), Balatan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BALATAN (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96489125.4,"abc":96489164.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-20","lat":13.32191,"lon":123.23334,"sm":123,"fm":123,"tm":123,"am":123,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4766},{"i":6214,"cid":"24FI0063","pid":"P00820484LZ","t":"Construction of Flood Mitigation Structure, Barangay Quinyangan Diotay, Balud, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"BALUD (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION / 3R3M CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: 3R3M CONSTRUCTION AND SUPPLY)","c":62724959.24,"abc":62724959.24,"fy":"2024","sd":"07/10/2024","cd":"2025-03-17","lat":11.964186,"lon":123.233907,"sm":139,"fm":139,"tm":139,"am":139,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quinyangan Diotay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4767},{"i":6215,"cid":"23FM0003","pid":"P00726297LZ","t":"Construction of Flood Mitigation Structure at Siargao River(Upstream), Poblacion District 2, Claveria, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CLAVERIA (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":23516730.44,"abc":23520000.0,"fy":"2023","sd":"04/09/2023","cd":"2023-07-15","lat":12.89944,"lon":123.2378,"sm":443,"fm":443,"tm":443,"am":443,"md":0.0,"ls":"inside","ww":"Siargao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4768},{"i":6216,"cid":"24FM0035","pid":"P00820434LZ","t":"Construction of Flood Control at Siargao River, Poblacion 1 and 2, Claveria, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CLAVERIA (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / SJMC CONSTRUCTION SERVICES","c":96490836.48,"abc":96500000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-11-28","lat":12.898611,"lon":123.238056,"sm":443,"fm":443,"tm":443,"am":443,"md":0.0,"ls":"inside","ww":"Siargao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4769},{"i":6217,"cid":"23FN0042","pid":"P00736135LZ","t":"Construction of Flood Mitigation Structure, Brgy. Duran and Brgy. Coguit, Balatan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BALATAN (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48221995.0,"abc":48221995.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-18","lat":13.30817,"lon":123.23818,"sm":123,"fm":123,"tm":123,"am":123,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Duran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4770},{"i":6218,"cid":"23EH0062","pid":"P00736058LZ","t":"Construction of Seawall along Agutay, Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"MAGDIWANG (ROMBLON)","deo":"Romblon District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":95535000.0,"abc":95534999.99,"fy":"2023","sd":"03/29/2023","cd":"2023-12-06","lat":12.46333,"lon":122.43889,"sm":866,"fm":866,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4771},{"i":6219,"cid":"23HO0231","pid":"P00745601VS","t":"Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Upstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+162","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":87599384.57,"abc":87599650.26,"fy":"2023","sd":"08/10/2023","cd":"2024-05-27","lat":9.647881,"lon":123.32485,"sm":887,"fm":887,"tm":362,"am":887,"md":0.0,"ls":"inside","ww":"Damaged Saliring","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":117.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":89.23,"text":"The record contradicts itself: the municipality field and the pin point to Malabuyoc, Cebu, but the title names Cebu City, Cebu, 89 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.52,"value":748713,"text":"About PHP 748,713 per metre over 117 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":159},{"i":6220,"cid":"22GK0009","pid":"P00630179VS","t":"Construction of Flood Control Structure at Coastal Barangays of Tuburan-Tomongtong and Gahit, Enrique B. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96497991.15,"abc":96499997.03,"fy":"2022","sd":"02/22/2022","cd":"2023-04-24","lat":10.889329,"lon":122.955883,"sm":548,"fm":548,"tm":548,"am":548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"of Tuburan-Tomongtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4772},{"i":6221,"cid":"23GF0088","pid":"P00731679VS","t":"Construction of Particion Flood Control Project, Barangay Particion, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":48485507.81,"abc":49000000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-03-13","lat":10.681111,"lon":122.307222,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Particion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4773},{"i":6222,"cid":"22FN0031","pid":"P00621125LZ","t":"Construction of River Slope Protection along Bicol River, Ombao Heights-Ombao Polpog, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":39116647.55,"abc":39200000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-11-25","lat":13.46863,"lon":123.241076,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.0,"wp":[13.46861,123.24107],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4774},{"i":6223,"cid":"23FD0022","pid":"P00740489LZ","t":"Construction of Riverbank Protection Structure along Kilbay River, Brgy. Comadaycaday to Brgy. San Juan, Del Gallego, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"DEL GALLEGO (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":72374410.13,"abc":72374414.82,"fy":"2023","sd":"04/19/2023","cd":"2023-12-12","lat":13.919869,"lon":122.603627,"sm":502,"fm":502,"tm":502,"am":502,"md":0.0,"ls":"inside","ww":"Kilbay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Comadaycaday","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4775},{"i":6224,"cid":"23GF0064","pid":"P00721650VS","t":"Construction of Laguna Shoreline Protection, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"TOPMOST DEVELOPMENT & MKTG. CORP.","c":14667784.1,"abc":14700000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-10-07","lat":10.661993,"lon":122.307403,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4776},{"i":6225,"cid":"23FD0007","pid":"P00726291LZ","t":"Construction of Revetment, Barangay Poblacion, Sta. 49+820.00 - Sta. 50+020.00, Lupi, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":48999620.59,"abc":48999621.56,"fy":"2023","sd":"05/18/2023","cd":"2024-02-06","lat":13.790428,"lon":122.907932,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4777},{"i":6226,"cid":"24GH0104","pid":"P00820170VS","t":"Construction of Sto. Rosario CIS Slope Protection, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"SBF CONSTRUCTION & DEVELOPMENT CORPORATION","c":9702998.81,"abc":9800000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-08-09","lat":11.09783,"lon":122.95762,"sm":14,"fm":14,"tm":14,"am":14,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4778},{"i":6227,"cid":"23DL0084","pid":"P00727171LZ","t":"Construction of Drainage Structure along Calauag-Guinayangan-Buenavista-Lopez Road, Barangay Calimpak, Guinayangan, Quezon","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUINAYANGAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"DZEE BUILDERS AND CONSTRUCTION SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-09-04","lat":13.911133,"lon":122.441758,"sm":600,"fm":600,"tm":600,"am":600,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calimpak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4779},{"i":6228,"cid":"22FN0042","pid":"P00631429LZ","t":"Construction of River Slope Protection along Bicol River, Barangay Ombao Polpog, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RICHMAR CONSTRUCTION","c":48999963.93,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-30","lat":13.472451,"lon":123.241251,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.4726,123.24108],"wst":"matched","br":"Ombao Polpog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4780},{"i":6229,"cid":"21F00122","pid":"P00561131LZ","t":"Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Libon","deo":"Albay 3rd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":192072579.2,"abc":192999778.4,"fy":"2021","sd":"12/16/2021","cd":"2022-12-15","lat":13.194167,"lon":123.326111,"sm":782,"fm":null,"tm":782,"am":782,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4781},{"i":6230,"cid":"23FD0013","pid":"P00740488LZ","t":"Construction of Riverbank Protection Structure along Kilbay River, Del Gallego, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"DEL GALLEGO (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY / SHLA CONSTRUCTION AND SUPPLY","c":72374529.7,"abc":72374615.83,"fy":"2023","sd":"04/19/2023","cd":"2023-11-10","lat":13.919809,"lon":122.604171,"sm":502,"fm":502,"tm":502,"am":502,"md":0.0,"ls":"inside","ww":"Kilbay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4782},{"i":6231,"cid":"23FD0014","pid":"P00740483LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. San Isidro Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"HONEYVILLECONST AND DEVELOPMENT CORPORATION","c":82024700.2,"abc":82024705.7,"fy":"2023","sd":"04/19/2023","cd":"2023-12-06","lat":13.821175,"lon":122.907963,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.06,"wp":[13.82168,122.90779],"wst":"matched","br":"San Isidro Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4783},{"i":6232,"cid":"23GA0172","pid":"P00721483VS","t":"Rehabilitation of Seawall, Sitio Baybay, Barangay Polo, New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / GREENLAND BUILDERS","c":72374994.45,"abc":72375000.0,"fy":"2023","sd":"04/13/2023","cd":"2024-05-20","lat":11.640066,"lon":122.44337,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Polo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4784},{"i":6233,"cid":"24HO0081","pid":"P00834659VS","t":"Construction of Revetment along Lalao River, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"GREEN WORLD CONSTRUCTION / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":39196051.67,"abc":39196117.95,"fy":"2024","sd":"02/26/2024","cd":"2024-05-27","lat":9.676612,"lon":123.326344,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":"Lalao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4785},{"i":6234,"cid":"21GF0125","pid":"P00549999VS","t":"Construction / Improvement of Cutoff Channel And Waterway Along Guimbal River, Guimbal, Iloilo","w":"Construction of Cutoff Channel","rg":"Region VI","pv":"ILOILO","mu":"Guimbal","deo":"Iloilo 1st District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":19603507.77,"abc":19800000.0,"fy":"2021","sd":"01/06/2022","cd":"2022-08-15","lat":10.683611,"lon":122.3075,"sm":599,"fm":null,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Cutoff","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4786},{"i":6235,"cid":"24JF0004","pid":"P00820218MN","t":"Construction of Flood Control Structure along Sanito River (Phase IV), Ipil, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"BARILLO CONSTRUCTION AND ENTERPRISES","c":38685192.0,"abc":57900000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-11-18","lat":7.76504,"lon":122.60627,"sm":647,"fm":647,"tm":647,"am":647,"md":0.0,"ls":"inside","ww":"Sanito","wn":"Sanito River","wd":0.05,"wp":[7.76541,122.60609],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4787},{"i":6236,"cid":"23FD0031","pid":"P00740481LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Cristo Rey Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024604.89,"abc":82024605.46,"fy":"2023","sd":"04/19/2023","cd":"2023-11-30","lat":13.821323,"lon":122.908078,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.82173,122.90794],"wst":"matched","br":"Cristo Rey Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4788},{"i":6237,"cid":"24JG0017","pid":"P00820139MN","t":"Construction of Flood Control Structure along Dumalian River, Brgy. Dumalian, San Miguel, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"SAN MIGUEL (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"NRMM CONSTRUCTION AND DEV'T CORP.","c":48974384.57,"abc":49000000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-07-16","lat":7.723305,"lon":123.242243,"sm":1335,"fm":1335,"tm":1335,"am":1335,"md":0.0,"ls":"inside","ww":"Dumalian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dumalian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4789},{"i":6238,"cid":"24JF0008","pid":"P00820226MN","t":"Construction of Flood Control Structure along Tupilac River (Phase V), RT Lim, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":57892201.4,"abc":57900000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-09-23","lat":7.63066,"lon":122.44709,"sm":647,"fm":647,"tm":null,"am":1608,"md":10.33,"ls":"outside","ww":"Tupilac","wn":"Tupilac River","wd":0.0,"wp":[7.63066,122.4471],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.33,"text":"The pin is 10.3 km outside Ipil, Zamboanga Sibugay, the nearest municipality the record claims. It falls in Tungawan, Zamboanga Sibugay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":199},{"i":6239,"cid":"23GA0108","pid":"P00721990VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Poblacion, Libacao, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"LIBACAO (AKLAN)","deo":"Aklan District Engineering Office","co":"PATRILA BUILDERS, INC.","c":27419992.88,"abc":27440000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-10-16","lat":11.481684,"lon":122.307876,"sm":776,"fm":776,"tm":776,"am":776,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.03,"wp":[11.48141,122.30796],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4790},{"i":6240,"cid":"22FG0013","pid":"P00631427LZ","t":"Improvement of Flood Mitigation Structure along Himoragat River, Tinambac, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TINAMBAC (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"SHLA CONSTRUCTION AND SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/15/2022","cd":"2023-07-13","lat":13.81464,"lon":123.32641,"sm":1567,"fm":1567,"tm":1567,"am":1567,"md":0.0,"ls":"inside","ww":"Himoragat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4791},{"i":6241,"cid":"24JF0006","pid":"P00820220MN","t":"Construction of Flood Control Structure along Sanito River (Phase VI), Ipil, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"BARILLO CONSTRUCTION AND ENTERPRISES","c":38685192.0,"abc":57900000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-11-20","lat":7.76691,"lon":122.60823,"sm":647,"fm":647,"tm":647,"am":647,"md":0.0,"ls":"inside","ww":"Sanito","wn":"Sanito River","wd":0.04,"wp":[7.76695,122.60784],"wst":"matched","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4792},{"i":6242,"cid":"24HO0100","pid":"P00834668VS","t":"Construction of Riverbank Structure at Barangay Sto. Niño - Barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JA ACHACOSO ENTERPRISES & GENERAL SERVICES","c":48995671.74,"abc":48996071.74,"fy":"2024","sd":"03/18/2024","cd":"2024-08-12","lat":9.650534,"lon":123.327934,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4793},{"i":6243,"cid":"23GO0033","pid":"P00721639VS","t":"Construction of Drainage System, Hilado St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-06-22","lat":10.673534,"lon":122.957838,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4794},{"i":6244,"cid":"22FC0219","pid":"P00621484LZ","t":"Construction of Protection Works, Barangay Dogongan, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"888RV CONSTRUCTION AND SUPPLIES","c":29399945.15,"abc":29399945.15,"fy":"2022","sd":"03/31/2022","cd":"2022-10-18","lat":14.090436,"lon":122.908836,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dogongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4795},{"i":6245,"cid":"23FN0016","pid":"P00736116LZ","t":"Construction of Bank Protection Structure along Bicol River, Ombao Polpog Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"WELEX CONSTRUCTION, INCORPORATED (FORMERLY WELEX C","c":96386086.27,"abc":96386222.0,"fy":"2023","sd":"02/17/2023","cd":"2023-08-25","lat":13.47195,"lon":123.24343,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.47175,123.24366],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4796},{"i":6246,"cid":"24GA0022","pid":"P00820300VS","t":"Construction of Revetment Wall along Aklan River, Barangay Badiangan, Banga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":28949980.16,"abc":28950000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-07-19","lat":11.579236,"lon":122.308188,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.21,"wp":[11.58083,122.30722],"wst":"matched","br":"Badiangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4797},{"i":6247,"cid":"23GI0066","pid":"P00733720VS","t":"Construction of Buntatala Flood Control Project, Brgy. Buntatala, Leganes, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"LEGANES (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":96524109.64,"abc":96525000.0,"fy":"2023","sd":"04/04/2023","cd":"2024-05-24","lat":10.791911,"lon":122.610061,"sm":767,"fm":767,"tm":767,"am":767,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buntatala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4798},{"i":6248,"cid":"23FE0082","pid":"P00726971LZ","t":"Construction of Shore Protection and Seawall along Brgy.Caranan - Brgy. Dalupaon - Brgy. Tinalmud, Pasacao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139925000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-02-21","lat":13.518456,"lon":123.011726,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalupaon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4799},{"i":6249,"cid":"23FN0017","pid":"P00736121LZ","t":"Construction of Bank Protection Structure along Bicol River, Sto. Domingo-San Antonio Ogbon Section, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":96472842.95,"abc":96472910.0,"fy":"2023","sd":"02/17/2023","cd":"2023-09-15","lat":13.40282,"lon":123.32795,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.40274,123.32768],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4800},{"i":6250,"cid":"24JF0007","pid":"P00820225MN","t":"Construction of Flood Control Structure along Tupilac River (Phase IV), RT Lim, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"LAKEWOOD CONSTRUCTION COMPANY","c":57749526.89,"abc":57900000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-11-11","lat":7.63118,"lon":122.44957,"sm":647,"fm":647,"tm":null,"am":1221,"md":10.1,"ls":"outside","ww":"Tupilac","wn":"Tupilac River","wd":0.01,"wp":[7.6311,122.44964],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":10.1,"text":"The pin is 10.1 km outside Ipil, Zamboanga Sibugay, the nearest municipality the record claims. It falls in Roseller Lim, Zamboanga Sibugay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":200},{"i":6251,"cid":"21GK0193","pid":"P00549885VS","t":"Construction of Seawall, Barangay Tuburan Proper, Barangay Tuburan, EB Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":null,"deo":"Negros Occidental 1st District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":24500000.0,"abc":24749853.47,"fy":"2021","sd":"09/08/2021","cd":"2022-07-24","lat":10.873056,"lon":122.958056,"sm":null,"fm":null,"tm":null,"am":548,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tuburan Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":144},{"i":6252,"cid":"22GP0070","pid":"P00620278VS","t":"Construction of River Control along Panay River Basin, Sitio Ilaya Proper, Brgy. Atiplo, Mambusao, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"MAMBUSAO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":55969403.95,"abc":55969419.75,"fy":"2022","sd":"03/06/2022","cd":"2024-02-02","lat":11.43485,"lon":122.61013,"sm":909,"fm":909,"tm":909,"am":909,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":9.24,"wp":[11.38784,122.6802],"wst":"matched","br":"Atiplo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4801},{"i":6253,"cid":"23F00079","pid":"P00727321LZ","t":"Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":96499909.87,"abc":96499909.87,"fy":"2023","sd":"07/06/2023","cd":"2023-12-04","lat":14.094073,"lon":122.911753,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.04,"wp":[14.09413,122.91211],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4802},{"i":6254,"cid":"22JB0031","pid":"P00632607MN","t":"Construction of Flood Control, Langatian, Pres. Manuel Roxas, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"PRES. MANUEL A. ROXAS (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"GOLDEN LION CONSTRUCTION","c":4919990.04,"abc":4950000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-11-24","lat":8.51451,"lon":123.24451,"sm":1170,"fm":1170,"tm":1170,"am":1170,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4803},{"i":6255,"cid":"23GA0104","pid":"P00721986VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Daguitan, Banga, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":48999991.8,"abc":49000000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-03-25","lat":11.435833,"lon":122.308741,"sm":147,"fm":147,"tm":147,"am":776,"md":10.73,"ls":"outside","ww":"Aklan","wn":"Aklan River","wd":1.18,"wp":[11.42873,122.31682],"wst":"matched","br":"Daguitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":48,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.73,"text":"The pin is 10.7 km outside Banga, Aklan, the nearest municipality the record claims. It falls in Libacao, Aklan.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":212},{"i":6256,"cid":"24GI0093","pid":"P00820171VS","t":"Construction of Aganan RIS Dam Concrete Slope Protection, San Miguel, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN MIGUEL (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"1 BEATUS BUILDERS CORP.","c":11759999.77,"abc":11760000.0,"fy":"2024","sd":"05/07/2024","cd":"2024-12-31","lat":10.779826,"lon":122.451104,"sm":1332,"fm":1332,"tm":1332,"am":1332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4804},{"i":6257,"cid":"22F00023","pid":"P00620308LZ","t":"Construction/ Rehabilitation of Pantao Flood Mitigation System, Pantao, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION / PROTERRE CONSTRUCTION","c":48139996.4,"abc":48139996.4,"fy":"2022","sd":"03/23/2022","cd":"2022-12-18","lat":13.199622,"lon":123.329052,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4805},{"i":6258,"cid":"23GH0045","pid":"P00721494VS","t":"Construction of Flood Control Structure, Barangay Malayuan, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":86452076.5,"abc":86464000.0,"fy":"2023","sd":"02/17/2023","cd":"2024-07-03","lat":11.103844,"lon":123.01223,"sm":14,"fm":14,"tm":14,"am":14,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malayuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4806},{"i":6259,"cid":"23GO0034","pid":"P00721637VS","t":"Construction of Drainage System, Lopez Jaena St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"WILKINSON CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-11","lat":10.668181,"lon":122.958403,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4807},{"i":6260,"cid":"23GK0003","pid":"P00721659VS","t":"Construction of Flood Control Structure along Minabuno River, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":39198000.0,"abc":39199987.76,"fy":"2023","sd":"02/13/2023","cd":"2023-08-20","lat":10.91438,"lon":123.32922,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Minabuno","wn":"Minabuno River","wd":0.0,"wp":[10.91438,123.32922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6276],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4808},{"i":6261,"cid":"23GF0017","pid":"P00721648VS","t":"Construction of Camangahan River Control Project, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOOD FORTUNE INTERNATIONAL, INC.","c":14549734.26,"abc":14700000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-06-12","lat":10.715803,"lon":122.309394,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Camangahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4809},{"i":6262,"cid":"22DL0041","pid":"P00620617LZ","t":"Construction of Seawall in Barangay Manlayo, Guinayangan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUINAYANGAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-23","lat":13.904125,"lon":122.452088,"sm":600,"fm":600,"tm":600,"am":600,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manlayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4810},{"i":6263,"cid":"22FE0008","pid":"P00620710LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Caranan, Pasacao, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":47529798.51,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-15","lat":13.517203,"lon":123.013344,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caranan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4811},{"i":6264,"cid":"23EH0021","pid":"P00725880LZ","t":"Construction of Campalingo Flood Control Structure along Sibuyan Circumferential Road (Upstream and Downtream), San Fernando, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN FERNANDO (ROMBLON)","deo":"Romblon District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":50658133.52,"abc":50662499.78,"fy":"2023","sd":"02/21/2023","cd":"2023-08-16","lat":12.28998,"lon":122.6171,"sm":1275,"fm":1275,"tm":1275,"am":1275,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4812},{"i":6265,"cid":"24HL0011","pid":"P00820211VS","t":"Construction of Licolico River Control along Upstream B, Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-02","lat":9.148504,"lon":122.911836,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Licolico","wn":"Lico-lico River","wd":0.1,"wp":[9.14823,122.91097],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4813},{"i":6266,"cid":"24JF0002","pid":"P00820140MN","t":"Improvement of Balagon CIS Irrigation Drainage, Siay, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"SIAY (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"EG-VRYLE CONSTRUCTION & ENTERPRISES","c":10225709.86,"abc":13066340.0,"fy":"2024","sd":"04/17/2024","cd":"2025-02-10","lat":7.77551,"lon":122.91517,"sm":1440,"fm":1440,"tm":1440,"am":1440,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4814},{"i":6267,"cid":"23FD0012","pid":"P00736075LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Buenasuerte Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":82024538.0,"abc":82024565.85,"fy":"2023","sd":"03/31/2023","cd":"2023-11-17","lat":13.893661,"lon":122.915586,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.06,"wp":[13.89319,122.91579],"wst":"matched","br":"Buenasuerte Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4815},{"i":6268,"cid":"23FD0026","pid":"P00736089LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. San Pedro Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"MGT BUILDER'S & SUPPLY / R.K.X. ODIAMAR  CONSTRUCTION","c":82024747.74,"abc":82024756.3,"fy":"2023","sd":"03/31/2023","cd":"2023-10-23","lat":13.796515,"lon":122.916156,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.79694,122.91641],"wst":"matched","br":"San Pedro Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4816},{"i":6269,"cid":"23FD0023","pid":"P00736090LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Poblacion Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":82024518.55,"abc":82024538.02,"fy":"2023","sd":"03/31/2023","cd":"2023-11-16","lat":13.796453,"lon":122.916277,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.79687,122.91653],"wst":"matched","br":"Poblacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4817},{"i":6270,"cid":"24HJ0019","pid":"P00820199VS","t":"Construction of Flood Control along Habag River, La Libertad, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"LA LIBERTAD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"KOUKEN CONSTRUCTION","c":8731537.66,"abc":8820000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-06-24","lat":10.05279,"lon":123.24473,"sm":719,"fm":719,"tm":719,"am":719,"md":0.0,"ls":"inside","ww":"Habag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4818},{"i":6271,"cid":"23FD0027","pid":"P00740482LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Barrera Jr. Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":82024184.66,"abc":82024188.27,"fy":"2023","sd":"04/19/2023","cd":"2024-01-05","lat":13.796929,"lon":122.916549,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.01,"wp":[13.79688,122.91652],"wst":"matched","br":"Barrera Jr. Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4819},{"i":6272,"cid":"23GO0030","pid":"P00721635VS","t":"Construction/Rehabilitation/Improvement of Drainage System, La Salle St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-05-10","lat":10.679137,"lon":122.959591,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4820},{"i":6273,"cid":"22FF0052","pid":"P00640581LZ","t":"Construction of Slope Protection (Riprapping), Bgy. Carangcang, Magarao, Camarines Sur","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MAGARAO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":28211825.0,"abc":29699785.51,"fy":"2022","sd":"05/24/2022","cd":"2022-12-11","lat":13.665888,"lon":123.248228,"sm":864,"fm":864,"tm":864,"am":864,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carangcang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4821},{"i":6274,"cid":"21GA0100","pid":"P00521744VS","t":"Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"Malinao","deo":"Aklan District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":94314902.66,"abc":96500000.0,"fy":"2021","sd":"07/12/2021","cd":"2022-08-25","lat":11.642222,"lon":122.310833,"sm":898,"fm":null,"tm":898,"am":898,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":1.51,"wp":[11.65253,122.31991],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4822},{"i":6275,"cid":"24GI0019","pid":"P00820266VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay 15 and Barangay Sta. Cruz, San Miguel, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN MIGUEL (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"J E G CONSTRUCTION FIRM CORPORATION / UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION &","c":86849591.61,"abc":86850000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-11-27","lat":10.780413,"lon":122.45252,"sm":1332,"fm":1332,"tm":1332,"am":1332,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"15","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4823},{"i":6276,"cid":"24GK0005","pid":"P00820173VS","t":"Construction of Flood Control Structure along Minabuno River, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":48997991.31,"abc":48999992.35,"fy":"2024","sd":"02/14/2024","cd":"2024-08-12","lat":10.91438,"lon":123.32922,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Minabuno","wn":"Minabuno River","wd":0.0,"wp":[10.91438,123.32922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6260],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4824},{"i":6277,"cid":"24GH0079","pid":"P00820168VS","t":"Construction of Flood Control Structure, Barangay Pili, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":29399525.91,"abc":29400000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-12-10","lat":11.11729,"lon":123.0138,"sm":14,"fm":14,"tm":14,"am":14,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pili","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4825},{"i":6278,"cid":"22GH0071","pid":"P00620094VS","t":"Construction of Flood Control Structure, Brgy. Pili-Malayu-an-Mangorocoro, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC.","c":39703144.12,"abc":39200000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-03-20","lat":11.118512,"lon":123.01414,"sm":14,"fm":14,"tm":14,"am":14,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pili-Malayu-an-Mangorocoro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.41,"value":1.01284,"text":"Contract cost is 1.28% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":848},{"i":6279,"cid":"21GG0105","pid":"P00521606VS","t":"Construction of Flood Control/Slope Protection along Ulian River in Dueñas, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo 2nd District Engineering Office","co":"UBS UNITED BUILDERS AND SUPPLY INC.","c":14000000.0,"abc":14700000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-08-03","lat":11.048139,"lon":122.618807,"sm":635,"fm":null,"tm":635,"am":531,"md":29.85,"ls":"outside","ww":"Ulian","wn":"Ulian River","wd":0.09,"wp":[11.04874,122.6193],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.99,"value":29.85,"text":"The pin is 29.9 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Dueñas, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":250},{"i":6280,"cid":"22FN0016","pid":"P00620729LZ","t":"Construction of Laganac-Luluwasan Flood Control Structure, Balatan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BALATAN (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":39199942.42,"abc":39200000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-15","lat":13.32902,"lon":123.2489,"sm":123,"fm":123,"tm":123,"am":123,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4826},{"i":6281,"cid":"23FD0011","pid":"P00736074LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Belwang Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":82024679.88,"abc":82024683.97,"fy":"2023","sd":"03/31/2023","cd":"2023-08-23","lat":13.928841,"lon":122.917802,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.0,"wp":[13.92888,122.91782],"wst":"matched","br":"Belwang Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4827},{"i":6282,"cid":"22GO0079","pid":"P00620014VS","t":"Construction of Revetment with Floodwall in Banago Creek, Phase 3, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":58857280.0,"abc":58857280.0,"fy":"2022","sd":"03/01/2022","cd":"2023-05-15","lat":10.705342,"lon":122.959863,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Banago","wn":"Banago Creek","wd":0.0,"wp":[10.70534,122.95986],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4828},{"i":6283,"cid":"23GH0046","pid":"P00721493VS","t":"Construction of Flood Control Structure, Barangay Pili, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":86464000.0,"abc":86464000.0,"fy":"2023","sd":"02/17/2023","cd":"2024-02-29","lat":11.119943,"lon":123.014625,"sm":14,"fm":14,"tm":14,"am":14,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pili","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4829},{"i":6284,"cid":"22GG0082","pid":"P00620018VS","t":"Construction of Ulian River Control System, Dueñas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUEÑAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"UBS UNITED BUILDERS AND SUPPLY INC.","c":39200433.3,"abc":40002620.0,"fy":"2022","sd":"02/10/2022","cd":"2022-08-23","lat":11.048189,"lon":122.618807,"sm":531,"fm":531,"tm":531,"am":531,"md":0.0,"ls":"inside","ww":"Ulian","wn":"Ulian River","wd":0.08,"wp":[11.04876,122.61928],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4830},{"i":6285,"cid":"24HJ0024","pid":"P00820203VS","t":"Construction of Flood Control along P. Zamora River, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"KOUKEN CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-09-04","lat":10.06837,"lon":123.25004,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"P. Zamora","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4831},{"i":6286,"cid":"22DL0040","pid":"P00620615LZ","t":"Construction of Protection Works (Seawall) along Frenza River, Guinayangan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"GUINAYANGAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"MURIELEVEN BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-11-21","lat":13.894217,"lon":122.455797,"sm":600,"fm":600,"tm":600,"am":600,"md":0.05,"ls":"boundary","ww":"Frenza","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4832},{"i":6287,"cid":"23HO0024","pid":"P00721511VS","t":"Construction of Groundsill at Montañeza River, Malabuyoc, Cebu","w":"Construction of Groundsill","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":3342425.31,"abc":94520123.73,"fy":"2023","sd":"09/04/2023","cd":"2024-07-13","lat":9.687749,"lon":123.329493,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":"Montañeza","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4833},{"i":6288,"cid":"22GK0015","pid":"P00620098VS","t":"Construction of Flood Control Structure along Matab-ang River, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":48998000.0,"abc":48999988.02,"fy":"2022","sd":"02/08/2022","cd":"2022-08-07","lat":10.718509,"lon":122.960766,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":"Matab-ang","wn":"Matab-ang River","wd":0.02,"wp":[10.71835,122.96076],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4834},{"i":6289,"cid":"22GF0013","pid":"P00620084VS","t":"Construction of Camangahan River Flood Control Project, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":9701673.55,"abc":9800000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-08-22","lat":10.713902,"lon":122.310929,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Camangahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4835},{"i":6290,"cid":"23FE0046","pid":"P00736097LZ","t":"Construction of Dike along Shoreline, Brgy. Caranan (Phase 2), Pasacao, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-11-24","lat":13.516177,"lon":123.014629,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caranan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4836},{"i":6291,"cid":"23GG0018","pid":"P00721655VS","t":"Construction of Flood Control/Slope Protection along Ulian River in Dueñas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUEÑAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"UBS UNITED BUILDERS AND SUPPLY INC.","c":24427996.21,"abc":24500000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-25","lat":11.049081,"lon":122.619057,"sm":531,"fm":531,"tm":635,"am":531,"md":0.0,"ls":"inside","ww":"Ulian","wn":"Ulian River","wd":0.01,"wp":[11.04908,122.61897],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":29.96,"text":"The record contradicts itself: the municipality field and the pin point to Dueñas, Iloilo, but the title names Iloilo City, Iloilo, 30 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":593},{"i":6292,"cid":"24GK0006","pid":"P00820174VS","t":"Construction of Flood Control Structure of Matab-ang River (Upstream), Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":48999999.46,"abc":48999999.42,"fy":"2024","sd":"02/14/2024","cd":"2024-08-12","lat":10.71847,"lon":122.96127,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":"Matab-ang","wn":"Matab-ang River","wd":0.02,"wp":[10.71832,122.96126],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4837},{"i":6293,"cid":"23FD0024","pid":"P00736092LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Polantuna Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024888.9,"abc":82024953.97,"fy":"2023","sd":"03/31/2023","cd":"2023-06-26","lat":13.928909,"lon":122.917835,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.0,"wp":[13.92887,122.91782],"wst":"matched","br":"Polantuna Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4838},{"i":6294,"cid":"24HK0059","pid":"P00820207VS","t":"Construction of Calabnugan CIS Flood/Slope Protection Works/ River Sill, Sibulan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIBULAN (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"04/04/2024","cd":"2024-08-22","lat":9.31761,"lon":123.250582,"sm":1446,"fm":1446,"tm":1446,"am":1622,"md":0.55,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4839},{"i":6295,"cid":"22GA0027","pid":"P00620074VS","t":"Construction of Revetment Wall along Aklan River, Barangay Tinapuay, Banga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":48999997.71,"abc":49000000.0,"fy":"2022","sd":"06/03/2022","cd":"2023-10-25","lat":11.546262,"lon":122.311371,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.2,"wp":[11.54555,122.31309],"wst":"matched","br":"Tinapuay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4840},{"i":6296,"cid":"23HO0025","pid":"P00721513VS","t":"Construction of Revetment Wall along Montañeza (Upstream), Malabuyoc, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":95532668.54,"abc":95533212.98,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":9.687739,"lon":123.330065,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4841},{"i":6297,"cid":"23GL0039","pid":"P00732011VS","t":"Construction of Camansi River Bank Slope Protection Dowstream of Camansi Bridge along Jct Pontevedra - La Castellana Road (Left Bank), Barangay Robles, La Castellana, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":57900000.0,"abc":57900000.0,"fy":"2023","sd":"04/09/2023","cd":"2024-01-04","lat":10.33117,"lon":123.01517,"sm":718,"fm":718,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":"Camansi","wn":"Camansi River","wd":0.01,"wp":[10.33105,123.0152],"wst":"matched","br":"Robles","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4842},{"i":6298,"cid":"24J00233","pid":"P00820890MN","t":"Construction of Flood Control Structure at Magsaysay River Phase I RT Lim, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"ROSELLER LIM (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"BARILLO CONSTRUCTION AND ENTERPRISES","c":95529501.4,"abc":96500000.0,"fy":"2024","sd":"05/08/2024","cd":"2025-01-27","lat":7.65128,"lon":122.46504,"sm":1221,"fm":1221,"tm":null,"am":1221,"md":0.0,"ls":"inside","ww":"Magsaysay","wn":"Magsaysay River","wd":0.0,"wp":[7.65127,122.46506],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4843},{"i":6299,"cid":"22G00168","pid":"P00630181VS","t":"Construction of River Control along Panay River Basin at Brgy. San Roque, Sta. 1+660 - Sta. 2+150, Dumalag, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMALAG (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":53075000.0,"abc":53075000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-05-30","lat":11.306,"lon":122.62,"sm":535,"fm":535,"tm":535,"am":535,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.07,"wp":[11.30577,122.62061],"wst":"matched","br":"San Roque","len":490.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":461},{"i":6300,"cid":"22FC0182","pid":"P00621485LZ","t":"Construction of Daet River Control Structure, Brgy. 1 Section Barangay 1, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":28511229.65,"abc":29399217.07,"fy":"2022","sd":"03/30/2022","cd":"2022-09-17","lat":14.112332,"lon":122.961987,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.03,"wp":[14.11257,122.96199],"wst":"matched","br":"1 Section Barangay 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4844},{"i":6301,"cid":"24GB0011","pid":"P00820273VS","t":"Construction of Flood Control Structure along Cangaranan River, Barangay Igbalangao, Bugasong, Antique","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ANTIQUE","mu":"BUGASONG (ANTIQUE)","deo":"Antique District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":82025000.0,"abc":82025000.0,"fy":"2024","sd":"02/09/2024","cd":"2024-12-16","lat":11.0053,"lon":122.62,"sm":243,"fm":243,"tm":243,"am":516,"md":43.86,"ls":"outside","ww":"Cangaranan","wn":"Cangaranan","wd":38.87,"wp":[11.07926,122.27215],"wst":"matched","br":"Igbalangao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":82,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":43.86,"text":"The pin is 43.9 km outside Bugasong, Antique, the nearest municipality the record claims. It falls in Dingle, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.88,"value":38.87,"text":"The title names Cangaranan, which OpenStreetMap maps through the stated municipality, but the pin is 38.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":13},{"i":6302,"cid":"23FD0021","pid":"P00736094LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Napolidan Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"MGT BUILDER'S & SUPPLY / R.K.X. ODIAMAR  CONSTRUCTION","c":80999846.15,"abc":82024231.78,"fy":"2023","sd":"03/31/2023","cd":"2023-11-17","lat":13.893678,"lon":122.917968,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.03,"wp":[13.89337,122.91796],"wst":"matched","br":"Napolidan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4845},{"i":6303,"cid":"23HL0031","pid":"P00721847VS","t":"Construction of River Control along Banica River, Downstream A & B, Valencia, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"03/01/2023","cd":"2023-10-08","lat":9.309444,"lon":123.251111,"sm":1622,"fm":1622,"tm":1622,"am":1622,"md":0.0,"ls":"inside","ww":"Banica","wn":"Banica River","wd":0.02,"wp":[9.30937,123.25124],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4846},{"i":6304,"cid":"23GL0037","pid":"P00732021VS","t":"Construction of Camansi River Bank Slope Protection Upstream of Camansi Bridge along Jct Pontevedra - La Castellana Road (Left Bank), Barangay Robles, La Castellana, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/09/2023","cd":"2023-12-24","lat":10.331295,"lon":123.0154,"sm":718,"fm":718,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":"Camansi","wn":"Camansi River","wd":0.01,"wp":[10.33128,123.01549],"wst":"matched","br":"Robles","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4847},{"i":6305,"cid":"22DM0086","pid":"P00621471LZ","t":"Construction of Flood Control Structures along Piris River, Buenavista, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"BUENAVISTA (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"MRRM TRADING & CONSTRUCTION","c":29400000.0,"abc":29399864.62,"fy":"2022","sd":"04/05/2022","cd":"2022-11-15","lat":13.741375,"lon":122.466752,"sm":237,"fm":237,"tm":237,"am":237,"md":0.0,"ls":"inside","ww":"Piris","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4848},{"i":6306,"cid":"24GF0118","pid":"P00832630VS","t":"Construction of Shoreline Protection Structurec, Coastwise, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"RINEL CONSTRUCTION SERVICES","c":29649524.81,"abc":29700000.0,"fy":"2024","sd":"04/29/2024","cd":"2025-03-03","lat":10.657151,"lon":122.312169,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4849},{"i":6307,"cid":"24GK0129","pid":"P00834637VS","t":"Construction of Flood Control Structure at Coastal Barangays of Tuburan - Tomongtong and Gahit, Enrique B. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SL & G CONSTRUCTION","c":29399993.82,"abc":29399991.35,"fy":"2024","sd":"02/19/2024","cd":"2024-08-06","lat":10.884722,"lon":122.9625,"sm":548,"fm":548,"tm":548,"am":548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"of Tuburan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4850},{"i":6308,"cid":"22HL0043","pid":"P00620321VS","t":"Rehabilitation of Tiabanan River Control, Upstream A, Basay, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BASAY (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":45810100.0,"abc":45810100.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-09","lat":9.43278,"lon":122.62306,"sm":172,"fm":172,"tm":172,"am":172,"md":0.0,"ls":"inside","ww":"Tiabanan","wn":"Tiabanan River","wd":0.02,"wp":[9.43278,122.62284],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4851},{"i":6309,"cid":"23HO0087","pid":"P00721888VS","t":"Construction of Road Dike at Sitio Poblacion - Sitio Tunga, Brgy. Montañeza, Malabuyoc","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96497659.06,"abc":96497670.0,"fy":"2023","sd":"03/16/2023","cd":"2024-01-16","lat":9.688658,"lon":123.331561,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4852},{"i":6310,"cid":"22HL0041","pid":"P00620319VS","t":"Rehabilitation of River Control along Bonawon River, Siaton, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-09-20","lat":9.1325,"lon":122.91889,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Bonawon","wn":"Bonawon River","wd":0.02,"wp":[9.1324,122.91874],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4853},{"i":6311,"cid":"23FN0028","pid":"P00736105LZ","t":"Rehabilitation of Revetment on Laganac River (Downstream and Upstream of Laganac Spillway) - Phase 2, Balatan, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BALATAN (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96478328.0,"abc":96478328.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-15","lat":13.33035,"lon":123.25161,"sm":123,"fm":123,"tm":123,"am":123,"md":0.0,"ls":"inside","ww":"Laganac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4854},{"i":6312,"cid":"24HL0012","pid":"P00820408VS","t":"Construction of Tiabanan River Control (Upstream A), Bal-os, Basay, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BASAY (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-07-31","lat":9.431944,"lon":122.623342,"sm":172,"fm":172,"tm":172,"am":172,"md":0.0,"ls":"inside","ww":"Tiabanan","wn":"Tiabanan River","wd":0.07,"wp":[9.43203,122.62274],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4855},{"i":6313,"cid":"23GL0089","pid":"P00744501VS","t":"Repair/Rehabilitation of Pantao Bridge Stone Masonry Slope Protection (Abutment ''A'' and ''B'') along Pontevedra - Lacastellana Road, La Castellana, Negros Occidental","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"ST. RAYMUND CONSTRUCTION, INC.","c":1154359.0,"abc":1158000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-07-09","lat":10.3347,"lon":123.0154,"sm":718,"fm":718,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4856},{"i":6314,"cid":"22GI0014","pid":"P00620237VS","t":"Construction of Aganan Flood Control Project (Jaro-Aganan River), Brgy. 5 to Brgy. Sto. Niño, San Miguel, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN MIGUEL (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED / GOOD FORTUNE INTERNATIONAL, INC.","c":96499992.73,"abc":96500000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-04-25","lat":10.783914,"lon":122.468417,"sm":1332,"fm":1332,"tm":1332,"am":1332,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4857},{"i":6315,"cid":"23HO0099","pid":"P00721889VS","t":"Construction of Road Dike at Sitio Tunga - Sitio Mainit, Brgy. Montañeza, Malabuyoc","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96497667.23,"abc":96497673.36,"fy":"2023","sd":"03/16/2023","cd":"2023-12-07","lat":9.688868,"lon":123.331624,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4858},{"i":6316,"cid":"22GK0172","pid":"P00632030VS","t":"Construction of Flood Control Structures, Municipality of EB Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":29399974.0,"abc":29399974.89,"fy":"2022","sd":"03/30/2022","cd":"2022-09-28","lat":10.88495,"lon":122.96271,"sm":548,"fm":548,"tm":null,"am":548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4859},{"i":6317,"cid":"22GN0076","pid":"P00632031VS","t":"Construction of Drainage System, Barangay Ayungon, La Carlota City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CARLOTA CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":39196031.75,"abc":39199995.37,"fy":"2022","sd":"03/31/2022","cd":"2023-06-25","lat":10.45917,"lon":122.9194,"sm":717,"fm":717,"tm":717,"am":717,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ayungon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4860},{"i":6318,"cid":"22HL0098","pid":"P00633021VS","t":"Construction of River Control Structure along Banica River, Valencia, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-02-14","lat":9.30972,"lon":123.25167,"sm":1622,"fm":1622,"tm":1622,"am":1622,"md":0.0,"ls":"inside","ww":"Banica","wn":"Banica River","wd":0.01,"wp":[9.30979,123.2516],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4861},{"i":6319,"cid":"22FC0072","pid":"P00631416LZ","t":"Construction of Seawall, Barangay Dayhagan, Jose Panganiban, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"JOSE PANGANIBAN (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":19019199.19,"abc":19599792.89,"fy":"2022","sd":"03/17/2022","cd":"2022-10-21","lat":14.291683,"lon":122.626308,"sm":677,"fm":677,"tm":677,"am":677,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dayhagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4862},{"i":6320,"cid":"24GF0026","pid":"P00832625VS","t":"Construction of Jarao River Control and Revetment Structure, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":49445882.19,"abc":49500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-15","lat":10.7175,"lon":122.31222,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Jarao","wn":"Jarao River","wd":0.09,"wp":[10.71675,122.31251],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4863},{"i":6321,"cid":"22FE0001","pid":"P00620723LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Uson, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48022335.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-05","lat":13.710533,"lon":123.017878,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.07,"wp":[13.71005,123.01749],"wst":"matched","br":"Uson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4864},{"i":6322,"cid":"22FC0130","pid":"P00631398LZ","t":"Construction of Flood Control Structure, Barangay Salvacion, Jose Panganiban, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"JOSE PANGANIBAN (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":19259399.53,"abc":19599324.6,"fy":"2022","sd":"03/24/2022","cd":"2022-08-29","lat":14.310718,"lon":122.631964,"sm":677,"fm":677,"tm":677,"am":677,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4865},{"i":6323,"cid":"23GG0050","pid":"P00721999VS","t":"Construction of Flood Control/Slope Protection along Alibunan River,Calinog, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":24499986.89,"abc":24500000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-25","lat":11.150444,"lon":122.470588,"sm":306,"fm":306,"tm":306,"am":306,"md":0.0,"ls":"inside","ww":"Alibunan","wn":"Alibunan River","wd":0.02,"wp":[11.15028,122.47058],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4866},{"i":6324,"cid":"24GK0076","pid":"P00832638VS","t":"Construction of Flood Control Structure, Barangay Lantad, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":10392962.4,"abc":10394998.95,"fy":"2024","sd":"02/14/2024","cd":"2024-05-28","lat":10.811944,"lon":122.96277,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lantad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4867},{"i":6325,"cid":"23F00118","pid":"P00726772LZ","t":"Construction of Daet River Flood Control Structure Phase II, Brgy. Bibirao and Brgy. Calasgasan, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"EUS CONSTRUCTION","c":77199972.9,"abc":77199973.4,"fy":"2023","sd":"06/30/2023","cd":"2023-12-18","lat":14.102262,"lon":122.919463,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.04,"wp":[14.1026,122.9194],"wst":"matched","br":"Bibirao","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4868},{"i":6326,"cid":"23FN0040","pid":"P00725884LZ","t":"Construction of Seramag River Flood Mitigation Structure, Brgy. Laganac, Balatan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BALATAN (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48244407.6,"abc":48244415.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-25","lat":13.33075,"lon":123.2523,"sm":123,"fm":123,"tm":123,"am":123,"md":0.0,"ls":"inside","ww":"Seramag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Laganac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4869},{"i":6327,"cid":"24GF0024","pid":"P00821042VS","t":"Construction of Jarao River Flood Control Project, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GALENO CONSTRUCTION, INC.","c":29094184.94,"abc":29400000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-25","lat":10.69248,"lon":122.31311,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Jarao","wn":"Jarao River","wd":0.04,"wp":[10.69224,122.31284],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4870},{"i":6328,"cid":"23HO0088","pid":"P00721890VS","t":"Construction of Road Dike at Sitio Poblacion - Sitio Galucan, Brgy. Montañeza, Malabuyoc","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96497659.53,"abc":96497671.28,"fy":"2023","sd":"03/16/2023","cd":"2023-12-07","lat":9.688629,"lon":123.331743,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4871},{"i":6329,"cid":"24HL0050","pid":"P00835016VS","t":"Construction of Mantuyop River Control, Upstream B, Sitio Mangapo, Mantuyop, Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":29700000.0,"abc":29700000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-08-06","lat":9.061792,"lon":123.018374,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Mantuyop","wn":"Mantuyop River","wd":0.2,"wp":[9.06337,123.01925],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4872},{"i":6330,"cid":"22HL0031","pid":"P00620309VS","t":"Rehabilitation of Basay Seawall, Basay, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BASAY (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"H.L.J CONSTRUCTION & ENTERPRISES","c":42786800.0,"abc":42786800.0,"fy":"2022","sd":"03/08/2022","cd":"2023-04-28","lat":9.408044,"lon":122.637528,"sm":172,"fm":172,"tm":172,"am":172,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4873},{"i":6331,"cid":"23GG0049","pid":"P00721654VS","t":"Construction of Flood Control/Slope Protection along Tigum River, Maasin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MAASIN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"TIB TIMCO INFRA BUILDERS","c":19599435.17,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-25","lat":10.883879,"lon":122.471177,"sm":839,"fm":839,"tm":839,"am":277,"md":1.58,"ls":"adjacent","ww":"Tigum","wn":"Tigum River","wd":0.01,"wp":[10.88384,122.47109],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4874},{"i":6332,"cid":"22FE0052","pid":"P00631002LZ","t":"Rehabilitation of River Wall along Libmanan River, Brgy. Uson, Libmanan, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":70925228.67,"abc":72375000.0,"fy":"2022","sd":"05/25/2022","cd":"2022-12-09","lat":13.708897,"lon":123.019586,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.06,"wp":[13.70852,123.01914],"wst":"matched","br":"Uson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4875},{"i":6333,"cid":"24JG0015","pid":"P00820137MN","t":"Construction of Bulawan Flood Control Project, Bulawan, San Miguel, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"SAN MIGUEL (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"NRMM CONSTRUCTION AND DEV'T CORP.","c":29384767.64,"abc":29400000.0,"fy":"2024","sd":"05/02/2024","cd":"2024-08-15","lat":7.62775,"lon":123.25368,"sm":1335,"fm":1335,"tm":1335,"am":1335,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4876},{"i":6334,"cid":"22JF0027","pid":"P00630570MN","t":"Construction of Riverwall, Barangay Camanga, Siay, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"SIAY (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":38699939.44,"abc":39200000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-11-20","lat":7.761117,"lon":122.921442,"sm":1440,"fm":1440,"tm":1440,"am":1440,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camanga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4877},{"i":6335,"cid":"23HO0228","pid":"P00745598VS","t":"Repair/ Rehabilitation/ Reconstruction of Montañeza River Flood Control System (Upstream-Section 1), Malabuyoc, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC. / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":94315929.32,"abc":94316016.53,"fy":"2023","sd":"08/10/2023","cd":"2024-06-08","lat":9.688979,"lon":123.332347,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":"Montañeza","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4878},{"i":6336,"cid":"22DM0045","pid":"P00620866LZ","t":"Construction of Flood Control Structures along Catanauan River (Sta. 4+202 - Sta. 4+577) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JAICA CONST. CORP","c":68997500.0,"abc":68997392.35,"fy":"2022","sd":"02/16/2022","cd":"2022-11-08","lat":13.60527,"lon":122.31377,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.02,"wp":[13.60539,122.31386],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":46.24,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 46 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":505},{"i":6337,"cid":"22GG0063","pid":"P00620006VS","t":"Construction of Flood Control Structure/Slope Protection Structure along Suage River, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":62361253.4,"abc":63634030.0,"fy":"2022","sd":"02/18/2022","cd":"2023-11-26","lat":10.944465,"lon":122.64051,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.03,"wp":[10.94462,122.64069],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4879},{"i":6338,"cid":"22JC0047","pid":"P00620006MN","t":"Construction of Flood Control Structure along Kipit River, Zamboanga del Norte along Kipit Br. 2 Section (B01183MN) (Upstream - Left Side)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LABASON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION","c":86058217.5,"abc":86058217.5,"fy":"2022","sd":"03/02/2022","cd":"2022-10-15","lat":8.05592,"lon":122.47147,"sm":728,"fm":728,"tm":null,"am":728,"md":0.0,"ls":"inside","ww":"Kipit","wn":"Kipit River","wd":0.04,"wp":[8.05603,122.47112],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4880},{"i":6339,"cid":"23JI0013","pid":"P00721227MN","t":"Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Barangay Sampoli B, Diplahan, Zamboanga Sibugay (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"LAKEWOOD CONSTRUCTION COMPANY","c":57803416.06,"abc":57900000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-25","lat":7.792133,"lon":122.963339,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":2.05,"wp":[7.77954,122.97701],"wst":"matched","br":"Sampoli B","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4881},{"i":6340,"cid":"24JC0008","pid":"P00833585MN","t":"Construction of Flood Control Structure, Jose Dalman, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"JOSE DALMAN (PONOT) (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"RDT CONSTRUCTION AND GENERAL MERCHANDISE","c":9894959.6,"abc":9900000.0,"fy":"2024","sd":"02/14/2024","cd":"2025-02-23","lat":8.45081,"lon":123.019749,"sm":676,"fm":676,"tm":676,"am":676,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4882},{"i":6341,"cid":"22HL0093","pid":"P00633020VS","t":"Construction of Palinpinon River Control Structure, Valencia, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALENCIA (LUZURRIAGA) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-11-13","lat":9.31667,"lon":123.255,"sm":1622,"fm":1622,"tm":1622,"am":534,"md":0.08,"ls":"boundary","ww":"Palinpinon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4883},{"i":6342,"cid":"22JF0026","pid":"P00630474MN","t":"Construction of Riverwall, Barangay Balagon, Siay, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"SIAY (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":96039900.6,"abc":98000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-12","lat":7.761561,"lon":122.92155,"sm":1440,"fm":1440,"tm":1440,"am":1440,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balagon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4884},{"i":6343,"cid":"23DM0043","pid":"P00726589LZ","t":"Construction of Flood Control Structure along Catanauan River, Sta. 4 + 100 - Sta. 4 + 525, Right Side, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":67550000.0,"abc":67549901.08,"fy":"2023","sd":"03/06/2023","cd":"2024-05-31","lat":13.605431,"lon":122.313939,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.01,"wp":[13.60537,122.31389],"wst":"matched","br":null,"len":425.0,"ph":null,"dup":[],"run":[6447,6464],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DM0042 to 23DM0044) cover the same site, together worth PHP 212,300,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":446},{"i":6344,"cid":"23HO0236","pid":"P00745599VS","t":"Repair/ Rehabilitation/ Reconstruction of Montañeza River Flood Control System (Upstream-Section 2), Malabuyoc, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JUSTBILT BUILDERS / NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":95377254.06,"abc":95377514.44,"fy":"2023","sd":"08/10/2023","cd":"2024-06-09","lat":9.68848,"lon":123.333732,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":"Montañeza","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4885},{"i":6345,"cid":"23GG0051","pid":"P00721933VS","t":"Construction of Flood Control/Slope Protection along Tigum River, Cabatuan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MAASIN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"TIB TIMCO INFRA BUILDERS","c":28801449.8,"abc":29400000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-08-20","lat":10.882994,"lon":122.471559,"sm":277,"fm":839,"tm":277,"am":277,"md":0.0,"ls":"inside","ww":"Tigum","wn":"Tigum River","wd":0.01,"wp":[10.88297,122.47151],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4886},{"i":6346,"cid":"23JI0012","pid":"P00721228MN","t":"Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":57843164.86,"abc":57900000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-11-27","lat":7.792569,"lon":122.963547,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":2.07,"wp":[7.77968,122.97714],"wst":"matched","br":"Sampoli A","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4887},{"i":6347,"cid":"23FC0073","pid":"P00742476LZ","t":"Construction of Flood Control Structure, Brgy. Bayabas, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY","c":9899092.81,"abc":9899092.81,"fy":"2023","sd":"05/03/2023","cd":"2023-08-25","lat":14.187469,"lon":122.473135,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayabas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4888},{"i":6348,"cid":"23FE0062","pid":"P00726962LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Uson, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":72352610.15,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-22","lat":13.707408,"lon":123.02072,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.07,"wp":[13.70709,123.0202],"wst":"matched","br":"Uson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4889},{"i":6349,"cid":"24HJ0053","pid":"P00820202VS","t":"Construction of Flood Control along Naasog River, Barangay P. Zamora Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"KOUKEN CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-13","lat":10.077898,"lon":123.255372,"sm":388,"fm":388,"tm":null,"am":388,"md":0.0,"ls":"inside","ww":"Naasog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"P. Zamora Guihulngan City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4890},{"i":6350,"cid":"24JG0016","pid":"P00820138MN","t":"Construction of Dinas River Flood Control, Barangay Balongating, Guipos Zamboanga del Sur, Phase IV","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"GUIPOS (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":19362789.0,"abc":19600000.0,"fy":"2024","sd":"04/08/2024","cd":"2025-01-27","lat":7.749118,"lon":123.334037,"sm":605,"fm":605,"tm":null,"am":605,"md":0.0,"ls":"inside","ww":"Dinas","wn":"Dinas River","wd":7.89,"wp":[7.69177,123.29141],"wst":"matched","br":"Balongating","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4891},{"i":6351,"cid":"23FD0028","pid":"P00736076LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. San Ramon Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":81923120.95,"abc":81923121.41,"fy":"2023","sd":"03/31/2023","cd":"2023-11-17","lat":13.892718,"lon":122.921678,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.89228,122.92185],"wst":"matched","br":"San Ramon Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4892},{"i":6352,"cid":"23GA0101","pid":"P00721983VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Taba-ao, Banga, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48999776.62,"abc":49000000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-22","lat":11.6212,"lon":122.314066,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.06,"wp":[11.62164,122.31377],"wst":"matched","br":"Taba-ao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4893},{"i":6353,"cid":"21GG0160","pid":"P00521769VS","t":"Rehabilitation of Flood Control Structure Along Jalaur River, Barangay Poblacion, Passi City, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"City of Passi","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":13982427.05,"abc":13982640.0,"fy":"2021","sd":"03/29/2022","cd":"2023-01-01","lat":11.101714,"lon":122.640536,"sm":413,"fm":null,"tm":413,"am":413,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.07,"wp":[11.102,122.64106],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4894},{"i":6354,"cid":"23JI0014","pid":"P00721364MN","t":"Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Sta. 0+000.00 - Sta. 0+303.50, Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 2)","w":"Construction of Revetment","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"L.C. CONSTRUCTION CORPORATION (FOR: L.C. CONSTRUCTION)","c":48944628.48,"abc":49000000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-12-18","lat":7.789611,"lon":122.963906,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":1.82,"wp":[7.77954,122.97701],"wst":"matched","br":"Sampoli A","len":303.5,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4895},{"i":6355,"cid":"22JC0046","pid":"P00620005MN","t":"Construction of Flood Control Structure along Kipit River, Zamboanga del Norte along Kipit Br. 2 Section (B01183MN) (Downstream - Left Side)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LABASON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"EDANNA CONSTRUCTION","c":86057735.0,"abc":86058217.5,"fy":"2022","sd":"03/02/2022","cd":"2022-11-15","lat":8.06366,"lon":122.47434,"sm":728,"fm":728,"tm":null,"am":728,"md":0.0,"ls":"inside","ww":"Kipit","wn":"Kipit River","wd":0.05,"wp":[8.06361,122.47389],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4896},{"i":6356,"cid":"24HL0017","pid":"P00820212VS","t":"Construction of Mantuyop River Control, Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":44067660.0,"abc":44067660.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-11","lat":9.048649,"lon":123.020875,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Mantuyop","wn":"Mantuyop River","wd":0.14,"wp":[9.04929,123.02197],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4897},{"i":6357,"cid":"22FN0021","pid":"P00620727LZ","t":"Construction of Flood Control Structure along Bicol River, Upstream Bacolod Bridge, Left Side, Sta. 0+147 - Sta. 0+600, Bato, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BATO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)","c":48999593.39,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-10-25","lat":13.364313,"lon":123.335435,"sm":182,"fm":182,"tm":182,"am":182,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.52,"wp":[13.36853,123.33766],"wst":"matched","br":null,"len":453.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4898},{"i":6358,"cid":"22FC0142","pid":"P00630991LZ","t":"Construction of Sula Seawall, Barangay Sula, Vinzons, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"VINZONS (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":49214258.35,"abc":49214258.35,"fy":"2022","sd":"03/22/2022","cd":"2023-01-28","lat":14.218808,"lon":122.921783,"sm":1639,"fm":1639,"tm":1639,"am":1639,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sula","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4899},{"i":6359,"cid":"22G00110","pid":"P00620291VS","t":"Construction of Revetment Wall along Aklan River, Poblacion, Madalag, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"MADALAG (AKLAN)","deo":"Aklan District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":46648504.47,"abc":48250000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-05-10","lat":11.525366,"lon":122.314081,"sm":854,"fm":854,"tm":854,"am":854,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.17,"wp":[11.52664,122.31497],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4900},{"i":6360,"cid":"24GG0066","pid":"P00820160VS","t":"Construction of Flood Control along Suage River in Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":38219688.96,"abc":38220000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-16","lat":10.942464,"lon":122.641008,"sm":1167,"fm":1167,"tm":635,"am":1167,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.02,"wp":[10.94248,122.64122],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":19.42,"text":"The record contradicts itself: the municipality field and the pin point to Pototan, Iloilo, but the title names Iloilo City, Iloilo, 19 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":567},{"i":6361,"cid":"24GK0075","pid":"P00832637VS","t":"Construction of Flood Control Structure, Barangay Batea, Municipality of EB Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SL & G CONSTRUCTION","c":4949999.69,"abc":4949999.69,"fy":"2024","sd":"02/14/2024","cd":"2024-05-05","lat":10.8772,"lon":122.96581,"sm":548,"fm":548,"tm":null,"am":548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Batea","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4901},{"i":6362,"cid":"22FE0004","pid":"P00620720LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Palangon, Libmanan Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48012861.68,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-17","lat":13.695776,"lon":123.020932,"sm":781,"fm":781,"tm":null,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.11,"wp":[13.69671,123.02134],"wst":"matched","br":"Palangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4902},{"i":6363,"cid":"22G00030","pid":"P00630178VS","t":"Construction of Flood Control Structure along Tigum River, Phase 2, Cabatuan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CABATUAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":101325000.0,"abc":101325000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-08-15","lat":10.878292,"lon":122.475149,"sm":277,"fm":277,"tm":277,"am":277,"md":0.0,"ls":"inside","ww":"Tigum","wn":"Tigum River","wd":0.06,"wp":[10.87795,122.47476],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4903},{"i":6364,"cid":"23HK0120","pid":"P00721532VS","t":"Rehabilitation of Lala-an Seawall, Barangay Sto. Niño, San Jose, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SAN JOSE (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION &","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"06/05/2023","cd":"2024-04-02","lat":9.38799,"lon":123.25825,"sm":1302,"fm":1302,"tm":1302,"am":1302,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4904},{"i":6365,"cid":"23GO0016","pid":"P00721641VS","t":"Construction of Flood Control Structure along Cabalagnan Creek, Phase 2, Barangay Pahanocoy, Bacolod City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":10.605306,"lon":122.921892,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Cabalagnan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pahanocoy","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4905},{"i":6366,"cid":"23GA0109","pid":"P00721991VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Paningayan, Madalag, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"MADALAG (AKLAN)","deo":"Aklan District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":48999204.19,"abc":49000000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-10-23","lat":11.523457,"lon":122.3144,"sm":854,"fm":854,"tm":854,"am":854,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.12,"wp":[11.52307,122.31547],"wst":"matched","br":"Paningayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4906},{"i":6367,"cid":"22GK0003","pid":"P00620103VS","t":"Construction of Flood Control Structure of Paniqui-on River along Bacolod North Road, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / GKMM CONSTRUCTION & SUPPLIES, INC. (FORMERLY: GKMM CONSTRUCTION & SUPPLIES)","c":40164560.0,"abc":44099996.91,"fy":"2022","sd":"02/08/2022","cd":"2022-08-15","lat":10.89572,"lon":123.33671,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Paniqui-on","wn":"Paniqui-on River","wd":0.01,"wp":[10.89568,123.33674],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4907},{"i":6368,"cid":"23GG0072","pid":"P00721652VS","t":"Construction of Flood Control/Slope Protection along Suage River, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":48998978.3,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-07-07","lat":10.944399,"lon":122.641052,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.02,"wp":[10.94433,122.64088],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4908},{"i":6369,"cid":"23F00280","pid":"P00742200LZ","t":"Construction of Daet River Control Structure, Gubat Section, Brgy. Gubat, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / ARIK CONSTRUCTION","c":98999990.3,"abc":98999990.3,"fy":"2023","sd":"12/20/2023","cd":"2024-11-21","lat":14.1128,"lon":122.9669,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.03,"wp":[14.11265,122.9667],"wst":"matched","br":"Gubat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4909},{"i":6370,"cid":"22GL0100","pid":"P00620405VS","t":"Construction of Buhangin River Bank Slope Protection (Upstream of Taburda Bridge) along Vallehermoso - Canla-on City-La Castallena Road, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-02-02","lat":10.33533,"lon":123.02125,"sm":718,"fm":718,"tm":null,"am":718,"md":0.0,"ls":"inside","ww":"Buhangin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4910},{"i":6371,"cid":"23GF0063","pid":"P00721929VS","t":"Construction of Poblacion East Shoreline Protection with Access Road, Oton, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"OTON (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"ASIA STRUCTURAL DEVELOPER CORPORATION","c":19599092.07,"abc":19600000.0,"fy":"2023","sd":"03/15/2023","cd":"2024-04-23","lat":10.688206,"lon":122.477378,"sm":1046,"fm":1046,"tm":1046,"am":1046,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4911},{"i":6372,"cid":"24GG0061","pid":"P00820034VS","t":"Construction of Slope Protection along Allbunan River in Brgy. Banban, Galinog, llollo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":120624908.0,"abc":120625000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-07-22","lat":11.163029,"lon":122.4797,"sm":306,"fm":306,"tm":null,"am":306,"md":0.0,"ls":"inside","ww":"Allbunan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Banban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4912},{"i":6373,"cid":"22FC0091","pid":"P00632955LZ","t":"Construction of Flood Mitigation Structure, Barangay Salvacion Purok 1 Creek, San Lorenzo Ruiz, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SAN LORENZO RUIZ (IMELDA) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":4803335.09,"abc":4949310.75,"fy":"2022","sd":"03/21/2022","cd":"2022-07-06","lat":13.951111,"lon":122.921917,"sm":1318,"fm":1318,"tm":1318,"am":1318,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salvacion Purok 1 Creek","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4913},{"i":6374,"cid":"24HO0090","pid":"P00820858VS","t":"Construction of Revetment Wall at Sitio Nonok - Sitio Mainit, Brgy. Montañeza, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":96495998.18,"abc":96496398.18,"fy":"2024","sd":"03/18/2024","cd":"2024-09-16","lat":9.68663,"lon":123.337654,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4914},{"i":6375,"cid":"22G00108","pid":"P00620289VS","t":"Construction of Revetment Wall along Aklan River, Barangay Lapnag, Banga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":48249302.2,"abc":48250000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-11-20","lat":11.601875,"lon":122.314544,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":1.32,"wp":[11.6129,122.30982],"wst":"matched","br":"Lapnag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4915},{"i":6376,"cid":"24HJ0063","pid":"P00820201VS","t":"Construction of Flood Control along McKinley River, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"EJJ CONSTRUCTION AND SUPPLY","c":14700000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-06-03","lat":10.08578,"lon":123.25934,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"McKinley","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4916},{"i":6377,"cid":"22HJ0017","pid":"P00620142VS","t":"Construction of Flood Control along Mc. Kinley River, Sta. 0+000 - Sta. 0+750, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"ALOJA BUILDERS AND REALTY","c":14700000.0,"abc":14700000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-07-25","lat":10.085789,"lon":123.259424,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Mc. Kinley","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4917},{"i":6378,"cid":"22GG0117","pid":"P00620436VS","t":"Construction of Flood Control/Slope Protection along Jalaur River in Passi City, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CITY OF PASSI (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":19587821.47,"abc":19600000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-07-03","lat":11.100277,"lon":122.642391,"sm":413,"fm":413,"tm":635,"am":413,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.04,"wp":[11.10014,122.64201],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":36.04,"text":"The record contradicts itself: the municipality field and the pin point to City of Passi, Iloilo, but the title names Iloilo City, Iloilo, 36 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":611},{"i":6379,"cid":"23GK0066","pid":"P00732017VS","t":"Construction of Flood Mitigation Structure (Irrigation), Barangay Luna, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"ROCK-WILLIAN CONSTRUCTION AND SUPPLY","c":4947393.0,"abc":4949962.61,"fy":"2023","sd":"02/13/2023","cd":"2023-04-24","lat":10.943888,"lon":123.260555,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Luna","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4918},{"i":6380,"cid":"23GG0158","pid":"P00721747VS","t":"Construction of Groundsills and Slope Protection of Barangay Batu, Jalaur River, Passi City, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CITY OF PASSI (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":74115163.12,"abc":77200000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-10-07","lat":11.077085,"lon":122.643538,"sm":413,"fm":413,"tm":413,"am":413,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.02,"wp":[11.07714,122.64366],"wst":"matched","br":"Batu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4919},{"i":6381,"cid":"21HK0085","pid":"P00549978VS","t":"Construction of Ocoy River Control, Calabnugan, Sibulan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"Sibulan","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"10/15/2021","cd":"2022-08-20","lat":9.3258,"lon":123.26194,"sm":1446,"fm":null,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":"Ocoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4920},{"i":6382,"cid":"22EH0056","pid":"P00641827LZ","t":"Construction of Mabulo Flood Control Structure (Upstream), San Fernando, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN FERNANDO (ROMBLON)","deo":"Romblon District Engineering Office","co":"MT. GUITING-GUITING CONSTRUCTION","c":24496124.69,"abc":24499999.5,"fy":"2022","sd":"04/11/2022","cd":"2022-08-15","lat":12.391389,"lon":122.484722,"sm":1275,"fm":1275,"tm":1275,"am":1275,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4921},{"i":6383,"cid":"24GK0146","pid":"P00834998VS","t":"Construction of Drainage System, Brgy. Zone 11, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SL & G CONSTRUCTION","c":4947449.14,"abc":4949995.49,"fy":"2024","sd":"03/13/2024","cd":"2024-06-04","lat":10.73438,"lon":122.96728,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 11","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4922},{"i":6384,"cid":"22GL0102","pid":"P00620406VS","t":"Construction of Buhangin River Bank Slope Protection (Downstream of Taburda Bridge) along Vallehermoso-Canla-on City-La Castellana Road, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-01-18","lat":10.33528,"lon":123.0213,"sm":718,"fm":718,"tm":null,"am":718,"md":0.0,"ls":"inside","ww":"Buhangin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4923},{"i":6385,"cid":"23GF0103","pid":"P00733716VS","t":"Construction of Brgy. Barroc Shoreline Protection, Brgy. Barroc, Tigbauan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TIGBAUAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"ABRIGHT BUILDERS CORPORATION","c":4939933.07,"abc":4950000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-07-09","lat":10.67623,"lon":122.316435,"sm":1566,"fm":1566,"tm":1566,"am":599,"md":2.25,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barroc Shoreline Protection","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4924},{"i":6386,"cid":"22GA0024","pid":"P00620012VS","t":"Construction of Revetment Wall, Brgy. Songcolan, Batan, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BATAN (AKLAN)","deo":"Aklan District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":56814451.8,"abc":57900000.0,"fy":"2022","sd":"03/15/2022","cd":"2023-05-08","lat":11.598466,"lon":122.485465,"sm":179,"fm":179,"tm":179,"am":1022,"md":1.08,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Songcolan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4925},{"i":6387,"cid":"23FE0078","pid":"P00726963LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Padlos, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-11-15","lat":13.703916,"lon":123.022093,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.08,"wp":[13.70388,123.0214],"wst":"matched","br":"Padlos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4926},{"i":6388,"cid":"22FC0109","pid":"P00632952LZ","t":"Construction of Flood Mitigation Structure of Mabulao Creek along Barangay 1, San Isidro Cobangbang Sections, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":19799782.74,"abc":19799782.94,"fy":"2022","sd":"03/21/2022","cd":"2022-09-10","lat":14.101311,"lon":122.968044,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Mabulao","wn":"Mabulao Creek","wd":0.03,"wp":[14.10152,122.96815],"wst":"matched","br":"1","len":null,"ph":"Section S","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4927},{"i":6389,"cid":"23GG0226","pid":"P00733232VS","t":"Construction of Slope Protection in San Enrique, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN ENRIQUE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":94086501.57,"abc":94087500.0,"fy":"2023","sd":"04/26/2023","cd":"2024-05-03","lat":11.097247,"lon":122.647256,"sm":1266,"fm":1266,"tm":635,"am":1266,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":35.84,"text":"The record contradicts itself: the municipality field and the pin point to San Enrique, Iloilo, but the title names Iloilo City, Iloilo, 36 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":483},{"i":6390,"cid":"22HK0085","pid":"P00632033VS","t":"Construction of Shore Protection, Brgy. Ajong, Sibulan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIBULAN (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"07/04/2022","cd":"2022-10-29","lat":9.378948,"lon":123.262786,"sm":1446,"fm":1446,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ajong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4928},{"i":6391,"cid":"22G00047","pid":"P00620250VS","t":"Construction of Flood Control Structure of Buluangan River (Downstream) along Bacolod North Road - San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":33775000.0,"abc":33775000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-02-04","lat":10.38775,"lon":123.337944,"sm":1262,"fm":1262,"tm":null,"am":1262,"md":0.0,"ls":"inside","ww":"Buluangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4929},{"i":6392,"cid":"22G00111","pid":"P00620072VS","t":"Construction of Revetment Wall along Agbalili River, Barangay Poblacion, Altavas, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"ALTAVAS (AKLAN)","deo":"Aklan District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":48249783.09,"abc":48250000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-08-24","lat":11.535008,"lon":122.485694,"sm":48,"fm":48,"tm":48,"am":48,"md":0.0,"ls":"inside","ww":"Agbalili","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4930},{"i":6393,"cid":"23GO0017","pid":"P00721489VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank (with Esplanade) along Sum-ag River, Bacolod City, Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-08-12","lat":10.105311,"lon":122.921953,"sm":95,"fm":95,"tm":95,"am":389,"md":53.26,"ls":"outside","ww":"Sum-ag","wn":"Sum-ag River","wd":48.28,"wp":[10.53964,122.96788],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":82,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":53.26,"text":"The pin is 53.3 km outside Bacolod City, Negros Occidental, the nearest municipality the record claims. It falls in City of Himamaylan, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":48.28,"text":"The title names Sum-ag, which OpenStreetMap maps through the stated municipality, but the pin is 48.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":14},{"i":6394,"cid":"24HO0091","pid":"P00820859VS","t":"Construction of Revetment Wall at Sitio Mainit - Sitio Nonok, Brgy. Montañeza, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":96495968.22,"abc":96496418.22,"fy":"2024","sd":"03/18/2024","cd":"2024-10-11","lat":9.68534,"lon":123.338488,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4931},{"i":6395,"cid":"23FE0057","pid":"P00726957LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Palangon, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":72334499.77,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-15","lat":13.695793,"lon":123.022522,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.69624,123.02268],"wst":"matched","br":"Palangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4932},{"i":6396,"cid":"23FC0080","pid":"P00742209LZ","t":"Construction of Flood Control at Barangay Guisican, Labo, Camarines Norte (Phase 8)","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":98999963.19,"abc":98999963.19,"fy":"2023","sd":"06/05/2023","cd":"2024-03-06","lat":14.18747,"lon":122.49146,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guisican","len":null,"ph":"Phase 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4933},{"i":6397,"cid":"23F00150","pid":"P00736122LZ","t":"Construction of Daet River Flood Control Structure with Road, Barangay Bibirao, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"EUS CONSTRUCTION","c":96499883.32,"abc":96499899.68,"fy":"2023","sd":"07/04/2023","cd":"2023-12-18","lat":14.103545,"lon":122.92239,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.04,"wp":[14.10389,122.92222],"wst":"matched","br":"Bibirao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4934},{"i":6398,"cid":"22HO0087","pid":"P00620455VS","t":"Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999996.9,"abc":48999996.9,"fy":"2022","sd":"03/23/2022","cd":"2022-12-17","lat":9.718369,"lon":123.338561,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Legaspi","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4935},{"i":6399,"cid":"23HJ0049","pid":"P00721840VS","t":"Construction of Flood Control Structure along Bateria River (Upstream), Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/07/2023","cd":"2023-09-21","lat":10.127563,"lon":123.262923,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Bateria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4936},{"i":6400,"cid":"22GP0024","pid":"P00630183VS","t":"Construction of River Control along Panay River Basin, Brgy. Sto. Niño, Sta. 0+000 - Sta. 0+356.705, Dumalag, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMALAG (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":53072959.65,"abc":53073080.5,"fy":"2022","sd":"04/06/2022","cd":"2024-02-09","lat":11.31617,"lon":122.64799,"sm":535,"fm":535,"tm":535,"am":535,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.04,"wp":[11.31643,122.64822],"wst":"matched","br":"Sto. Niño","len":356.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4937},{"i":6401,"cid":"22GL0060","pid":"P00630643VS","t":"Construction of Grouted Rip Rap and Line Canal along Jct Bagonawa - La Castellana - Isabela Road, K0069+000 - K0070+100 with exceptions, La Castellana, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":19799998.39,"abc":19800000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-08-15","lat":10.28925,"lon":123.02343,"sm":718,"fm":651,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4938},{"i":6402,"cid":"23FD0025","pid":"P00736093LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. San Jose Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"MGT BUILDER'S & SUPPLY / R.K.X. ODIAMAR  CONSTRUCTION","c":82024108.85,"abc":82024109.98,"fy":"2023","sd":"03/31/2023","cd":"2023-11-10","lat":13.922194,"lon":122.922802,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.15,"wp":[13.92197,122.92141],"wst":"matched","br":"San Jose Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4939},{"i":6403,"cid":"23FC0025","pid":"P00737558LZ","t":"Construction of Flood Mitigation Structure, Barangay Patag Ibaba, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"GREAT WALL ENGINEERING","c":4885102.75,"abc":4949559.66,"fy":"2023","sd":"04/05/2023","cd":"2023-05-22","lat":14.08555,"lon":122.316558,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patag Ibaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4940},{"i":6404,"cid":"22GO0027","pid":"P00620015VS","t":"Construction of Revetment with Floodwall in Mandalagan River, Phase 3, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":69163480.0,"abc":69163480.0,"fy":"2022","sd":"02/23/2022","cd":"2023-01-30","lat":10.689157,"lon":122.968428,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Mandalagan","wn":"Mandalagan Creek","wd":1.13,"wp":[10.68437,122.95931],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4941},{"i":6405,"cid":"22EH0019","pid":"P00620674LZ","t":"Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Upstream) along Dulangan River Control, Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"MAGDIWANG (ROMBLON)","deo":"Romblon District Engineering Office","co":"E.R. DELA CRUZ CONSTRUCTION & SUPPLY","c":47529824.24,"abc":47529999.98,"fy":"2022","sd":"03/01/2022","cd":"2023-04-22","lat":12.47,"lon":122.4917,"sm":866,"fm":866,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":"Dulangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":506},{"i":6406,"cid":"22FE0044","pid":"P00620708LZ","t":"Construction of Dike (along San Isidro-Aslong-Palangon Creek) within Bicol River Basin, Brgy. Aslong, Libmanan, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":48015893.0,"abc":49000000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-10-06","lat":13.684101,"lon":123.026764,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"San Isidro-Aslong-Palangon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Aslong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4942},{"i":6407,"cid":"22GO0129","pid":"P00620424VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank (w/ Esplanade) along Sum-ag River, Phase 2, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-02-26","lat":10.602526,"lon":122.922912,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Sum-ag","wn":"Sum-ag River","wd":0.01,"wp":[10.60254,122.92279],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4943},{"i":6408,"cid":"23GA0034","pid":"P00721481VS","t":"Rehabilitation of Seawall at the sites of NHA Housing Project and Gawad Kalinga Village, Barangay Fatima, New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":72742653.95,"abc":72742665.0,"fy":"2023","sd":"04/13/2023","cd":"2024-03-02","lat":11.60873,"lon":122.49298,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fatima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4944},{"i":6409,"cid":"22GP0079","pid":"P00620461VS","t":"Construction of River Control Structure along Panay River Basin, Brgy. Sto. Niño, Sta. 0 + 000 - Sta. 0 + -291, Dumalag, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMALAG (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":44099458.65,"abc":44099462.11,"fy":"2022","sd":"04/06/2022","cd":"2023-09-22","lat":11.31658,"lon":122.64834,"sm":535,"fm":535,"tm":535,"am":535,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.02,"wp":[11.31644,122.64821],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4945},{"i":6410,"cid":"22FN0023","pid":"P00631430LZ","t":"Construction of River Slope Protection along Bicol River, Downstream of Panoypoyan Bridge, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":47285080.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-07-28","lat":13.45863,"lon":123.26382,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.45873,123.26394],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4946},{"i":6411,"cid":"22GF0035","pid":"P00620087VS","t":"Construction of Jar-ao River Flood Control Project, Tubungan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TUBUNGAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":9702608.69,"abc":9800000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-08-10","lat":10.766931,"lon":122.316996,"sm":1597,"fm":1597,"tm":1597,"am":1597,"md":0.0,"ls":"inside","ww":"Jar-ao","wn":"Jar-ao River","wd":0.02,"wp":[10.76709,122.31684],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4947},{"i":6412,"cid":"23GO0015","pid":"P00721926VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank along Lupit River, Phase 2, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/03/2023","cd":"2024-04-03","lat":10.655806,"lon":122.968739,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Lupit","wn":"Lupit River","wd":0.02,"wp":[10.65569,122.96866],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4948},{"i":6413,"cid":"22HO0068","pid":"P00620458VS","t":"Construction of seawall protection along Santander - Barili-Toledo Road at Brgy. Poblacion to Brgy. Legaspi, Sta. 0+000 - Sta. 0+167, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999923.86,"abc":48999923.86,"fy":"2022","sd":"03/23/2022","cd":"2022-12-17","lat":9.717806,"lon":123.338644,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4949},{"i":6414,"cid":"23GL0066","pid":"P00733691VS","t":"Construction of Binalbagan River Bank Slope Protection along Binalbagan-Isabela Road, Brgy. San Jose, Binalbagan, Negros Occidental (Phase 3)","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"04/12/2023","cd":"2024-02-14","lat":10.207563,"lon":122.924589,"sm":204,"fm":204,"tm":204,"am":622,"md":0.02,"ls":"boundary","ww":"Binalbagan","wn":"Binalbagan River","wd":0.06,"wp":[10.20798,122.92492],"wst":"matched","br":"San Jose","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4950},{"i":6415,"cid":"24HL0013","pid":"P00820409VS","t":"Rehabilitation of River Control along Siaton River, Upstream A, Barangay Datag, Siaton, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-07-16","lat":9.091687,"lon":123.027155,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Siaton","wn":"Siaton River","wd":0.11,"wp":[9.09115,123.02804],"wst":"matched","br":"Datag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4951},{"i":6416,"cid":"22GG0100","pid":"P00620246VS","t":"Construction of Flood Control Structure along Jalaur River in Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"TIB TIMCO INFRA BUILDERS","c":19036065.74,"abc":19600000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-08-05","lat":10.813784,"lon":122.649539,"sm":538,"fm":538,"tm":635,"am":538,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.13,"wp":[10.81381,122.64837],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.19,"text":"The record contradicts itself: the municipality field and the pin point to Dumangas, Iloilo, but the title names Iloilo City, Iloilo, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":612},{"i":6417,"cid":"22HO0086","pid":"P00620454VS","t":"Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi to Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999811.45,"abc":48999811.45,"fy":"2022","sd":"03/23/2022","cd":"2022-12-17","lat":9.717604,"lon":123.338674,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Legaspi","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4952},{"i":6418,"cid":"21GA0101","pid":"P00521794VS","t":"Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Sta. Cruz - Bigaa, Lezo, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"Lezo","deo":"Aklan District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":93520048.17,"abc":98000000.0,"fy":"2021","sd":"04/15/2021","cd":"2022-07-13","lat":11.651742,"lon":122.317703,"sm":773,"fm":null,"tm":773,"am":898,"md":0.39,"ls":"boundary","ww":"Aklan","wn":"Aklan River","wd":0.26,"wp":[11.65253,122.31991],"wst":"matched","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4953},{"i":6419,"cid":"23HL0043","pid":"P00721851VS","t":"Construction of Maladpad River Control, Downstream A, Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-12-03","lat":9.12,"lon":122.925,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Maladpad","wn":"Maladpad River","wd":0.01,"wp":[9.11988,122.92496],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4954},{"i":6420,"cid":"22FN0030","pid":"P00631431LZ","t":"Construction of River Slope Protection along Bicol River, Upstream of Panoypoyan Bridge, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RICHMAR CONSTRUCTION","c":47285313.97,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-07-28","lat":13.4588,"lon":123.2641,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.45869,123.26397],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4955},{"i":6421,"cid":"23HL0005","pid":"P00721852VS","t":"Rehabilitation of River Control along Siaton River, Upstream A, Barangay Datag, Siaton, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"JANUARY BUILDERS","c":44100000.0,"abc":44100000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-05","lat":9.0925,"lon":123.028889,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Siaton","wn":"Siaton River","wd":0.03,"wp":[9.09251,123.02866],"wst":"matched","br":"Datag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4956},{"i":6422,"cid":"24F00152","pid":"P00820438LZ","t":"Construction of Flood Control Structure along Basud River, Barangay San Jose, Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":86849923.14,"abc":86849994.71,"fy":"2024","sd":"03/25/2024","cd":"2024-12-09","lat":14.0582,"lon":122.969,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":"Basud","wn":"Basud River","wd":0.04,"wp":[14.05856,122.96899],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4957},{"i":6423,"cid":"23GG0074","pid":"P00721812VS","t":"Construction of Flood Control/Slope Protection along Jalaur River, Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"PESOM CONSTRUCTION SERVICES (FORMERLY: PESOM BUILDERS AND CONSTRUCTION SUPPLY)","c":19490000.0,"abc":19600000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-02","lat":10.847636,"lon":122.650764,"sm":538,"fm":538,"tm":538,"am":538,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.03,"wp":[10.84787,122.65063],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4958},{"i":6424,"cid":"22EH0022","pid":"P00620673LZ","t":"Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Downstream) along Dulangan River Control, Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"MAGDIWANG (ROMBLON)","deo":"Romblon District Engineering Office","co":"R.G. FLORENTINO CONST. & TRADING INC.","c":45829108.83,"abc":46549999.61,"fy":"2022","sd":"04/13/2022","cd":"2022-10-10","lat":12.4778,"lon":122.4989,"sm":866,"fm":866,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":"Dulangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4959},{"i":6425,"cid":"23HO0069","pid":"P00721947VS","t":"Construction of Alegria Seawall Protection Structure, Alegria, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48895926.27,"abc":48895927.07,"fy":"2023","sd":"03/06/2023","cd":"2023-10-11","lat":9.729045,"lon":123.339008,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4960},{"i":6426,"cid":"24GL0045","pid":"P00820269VS","t":"Construction of Binalbagan River Bank Slope Protection along Binalbagan-Isabela Road (Left Bank), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / JVC TOUGH CORE CONSTRUCTION & BUILDERS CORP.","c":88258900.0,"abc":88258900.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-31","lat":10.202262,"lon":122.925714,"sm":204,"fm":204,"tm":null,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.04,"wp":[10.20257,122.92548],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4961},{"i":6427,"cid":"22GK0126","pid":"P00630633VS","t":"Construction of Drainage System, Talisay City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":4947860.0,"abc":4949996.82,"fy":"2022","sd":"03/30/2022","cd":"2022-07-12","lat":10.736667,"lon":122.969444,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4962},{"i":6428,"cid":"22FF0008","pid":"P00632964LZ","t":"Construction of Flood Mitigation Structure of San Jose Creek, Barangay San Jose, Pili, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PILI (CAPITAL) (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"DELPAR CONSTRUCTION & SUPPLIES","c":4945912.3,"abc":4949999.27,"fy":"2022","sd":"05/26/2022","cd":"2022-11-16","lat":13.577451,"lon":123.264427,"sm":1137,"fm":1137,"tm":1137,"am":1137,"md":0.0,"ls":"inside","ww":"San Jose","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4963},{"i":6429,"cid":"24GG0015","pid":"P00820391VS","t":"Construction of Flood Control Structure along Jalaur River in Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"MJ BARCELONA CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":48885166.99,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-08-07","lat":10.847452,"lon":122.65089,"sm":538,"fm":538,"tm":635,"am":538,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.05,"wp":[10.84788,122.65065],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":10.81,"text":"The record contradicts itself: the municipality field and the pin point to Dumangas, Iloilo, but the title names Iloilo City, Iloilo, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":541},{"i":6430,"cid":"22HL0089","pid":"P00633023VS","t":"Construction of Maladpad River Control (downstream), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/18/2022","cd":"2022-11-06","lat":9.12,"lon":122.92583,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Maladpad","wn":"Maladpad River","wd":0.0,"wp":[9.11996,122.92584],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4964},{"i":6431,"cid":"23GF0066","pid":"P00733718VS","t":"Construction of Guimbal Shoreline Protection, South Coast Section, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"CONTE BUILDERS & CONSTRUCTION SUPPLY","c":19335253.9,"abc":19800000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-01-05","lat":10.656976,"lon":122.317958,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4965},{"i":6432,"cid":"22E00146","pid":"P00641899LZ","t":"Construction of España Flood Control Structure (Phase 2), Brgy España, San Fernando, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"SAN FERNANDO (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":74202417.84,"abc":72374934.61,"fy":"2022","sd":"09/13/2022","cd":"2023-07-14","lat":12.380019,"lon":122.502419,"sm":1275,"fm":1275,"tm":1275,"am":1275,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"España","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"field","s":34,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02525,"text":"Contract cost is 2.52% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":568},{"i":6433,"cid":"24HO0102","pid":"P00835012VS","t":"Construction of Dike, Brgy. Montañeza-Brgy. Lombo, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":148495065.1,"abc":148495665.1,"fy":"2024","sd":"03/12/2024","cd":"2024-08-14","lat":9.685073,"lon":123.339018,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza-Brgy. Lombo","len":null,"ph":null,"dup":[6455],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 206,390,129.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":692},{"i":6434,"cid":"23FD0030","pid":"P00736091LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Tapi Section, Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"MGT BUILDER'S & SUPPLY / R.K.X. ODIAMAR  CONSTRUCTION","c":80966304.71,"abc":82024521.89,"fy":"2023","sd":"03/31/2023","cd":"2024-01-08","lat":13.784558,"lon":122.926236,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.02,"wp":[13.78458,122.92639],"wst":"matched","br":"Tapi Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4966},{"i":6435,"cid":"23JI0049","pid":"P00721658MN","t":"Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Pilar (Upstream), Diplahan, Zamboanga Sibugay Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":48939769.73,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-02-23","lat":7.747631,"lon":122.969819,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.06,"wp":[7.74764,122.97032],"wst":"matched","br":"Pilar","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4967},{"i":6436,"cid":"22GL0101","pid":"P00620439VS","t":"Construction of River Bank Slope Protection along Indurayan River, Downstream of Indurayan Bridge Left Bank, La Castellana, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96499993.8,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-04-01","lat":10.33851,"lon":123.03071,"sm":718,"fm":718,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":"Indurayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4968},{"i":6437,"cid":"22HJ0054","pid":"P00620144VS","t":"Construction of Flood Control along Tinayunan River, Sta. 0+000 - Sta. 1+500, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-10-17","lat":10.10086,"lon":123.26568,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Tinayunan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4969},{"i":6438,"cid":"24GG0153","pid":"P00834560VS","t":"Construction of Flood Control Structure, Barangay Balabag, Dumangas, Iloilo","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC. / MRZA CONSTRUCTION CORPORATION","c":76431495.76,"abc":77200000.0,"fy":"2024","sd":"03/08/2024","cd":"2025-02-24","lat":10.842647,"lon":122.653815,"sm":538,"fm":538,"tm":538,"am":538,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balabag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4970},{"i":6439,"cid":"23GF0094","pid":"P00721866VS","t":"Construction of Jarao River Flood Mitigation Structure including Access Road, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"TOPMOST DEVELOPMENT & MKTG. CORP.","c":62081979.88,"abc":62725000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-04-25","lat":10.726111,"lon":122.318055,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":"Jarao","wn":"Jarao River","wd":0.02,"wp":[10.7263,122.31794],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4971},{"i":6440,"cid":"22GM0008","pid":"P00620306VS","t":"Construction of Flood Mitigation Structure along Sipalay River, Phase 2, Sipalay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF SIPALAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":33753548.3,"abc":34300000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-09-21","lat":9.74806,"lon":122.50389,"sm":421,"fm":421,"tm":421,"am":421,"md":0.0,"ls":"inside","ww":"Sipalay","wn":"Sipalay","wd":0.12,"wp":[9.74869,122.50477],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4972},{"i":6441,"cid":"23FC0081","pid":"P00742475LZ","t":"Construction of Flood Control at Brgy. Tigbinan, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":29699257.64,"abc":29699257.64,"fy":"2023","sd":"08/09/2023","cd":"2024-03-11","lat":14.184019,"lon":122.507667,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tigbinan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4973},{"i":6442,"cid":"22J00051","pid":"P00620208MN","t":"Construction of Flood Control Structure at Sibuguey River, Sibuguey Br. Section (B00480MN) along Lanao - Pagadian - Zamboanga City Road (S01112MN), Zamboanga Sibugay (Phase II Downstream-Left Side) - Package 3","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IMELDA (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":101324314.0,"abc":101325000.0,"fy":"2022","sd":"02/22/2022","cd":"2023-07-04","lat":7.64574,"lon":122.92625,"sm":636,"fm":636,"tm":null,"am":636,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.02,"wp":[7.64595,122.9263],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4974},{"i":6443,"cid":"22GO0130","pid":"P00620420VS","t":"Drainage Improvements for Barangay Roads at Bacolod City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"WILKINSON CONSTRUCTION","c":72949175.0,"abc":72949175.0,"fy":"2022","sd":"03/25/2022","cd":"2024-06-27","lat":10.701638,"lon":122.969993,"sm":95,"fm":95,"tm":null,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Roads at Bacolod City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4975},{"i":6444,"cid":"22GL0099","pid":"P00620440VS","t":"Construction of River Bank Slope Protection along Indurayan River, Downstream of Indurayan Bridge Right Bank, La Castellana, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CASTELLANA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96499992.77,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-29","lat":10.33856,"lon":123.03076,"sm":718,"fm":718,"tm":718,"am":718,"md":0.0,"ls":"inside","ww":"Indurayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4976},{"i":6445,"cid":"23HK0104","pid":"P00733748VS","t":"Construction of Banica River Control, Dumaguete City, Negros Oriental (Phase 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"DUMAGUETE CITY (CAPITAL) (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION &","c":29700000.0,"abc":29700000.0,"fy":"2023","sd":"05/05/2023","cd":"2023-10-06","lat":9.308908,"lon":123.266084,"sm":534,"fm":534,"tm":534,"am":534,"md":0.0,"ls":"inside","ww":"Banica","wn":"Banica River","wd":0.01,"wp":[9.3088,123.26601],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4977},{"i":6446,"cid":"23GG0111","pid":"P00721810VS","t":"Construction of Flood Control Structure along Jalaur River, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":48506217.66,"abc":49000000.0,"fy":"2023","sd":"02/23/2023","cd":"2024-03-04","lat":10.852323,"lon":122.654169,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.02,"wp":[10.85234,122.65433],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4978},{"i":6447,"cid":"23DM0042","pid":"P00726588LZ","t":"Construction of Flood Control Structure along Catanauan River, Sta. 3 + 675 - Sta. 4 + 100, Right Side, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":67550000.0,"abc":67549419.49,"fy":"2023","sd":"03/06/2023","cd":"2024-06-02","lat":13.605989,"lon":122.318636,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.01,"wp":[13.60587,122.31858],"wst":"matched","br":null,"len":425.0,"ph":null,"dup":[],"run":[6343,6464],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DM0042 to 23DM0044) cover the same site, together worth PHP 212,300,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":447},{"i":6448,"cid":"22G00008","pid":"P00620287VS","t":"Construction of Coastal Dike in Brgy. Songcolan, Batan, Aklan","w":"Construction of Dike","rg":"Region VI","pv":"AKLAN","mu":"BATAN (AKLAN)","deo":"Aklan District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":40426458.54,"abc":48250000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-05-30","lat":11.591897,"lon":122.507683,"sm":179,"fm":179,"tm":179,"am":179,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Songcolan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4979},{"i":6449,"cid":"21GO0076","pid":"P00521589VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank  (with Esplanade) along Lupit River, Phase 3, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"Bacolod City","deo":"Bacolod City District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":31936464.9,"abc":34300000.0,"fy":"2021","sd":"10/07/2021","cd":"2023-09-25","lat":10.6514,"lon":122.97,"sm":95,"fm":null,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Lupit","wn":"Lupit River","wd":0.03,"wp":[10.65165,122.97006],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":522},{"i":6450,"cid":"23GN0050","pid":"P00721504VS","t":"Construction of Bank Protection along Canman-og Creek, La Carlota City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"LA CARLOTA CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 4th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":81058217.84,"abc":81059992.57,"fy":"2023","sd":"04/11/2023","cd":"2024-01-29","lat":10.4207,"lon":122.9263,"sm":717,"fm":717,"tm":717,"am":717,"md":0.0,"ls":"inside","ww":"Canman-og","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4980},{"i":6451,"cid":"23FN0013","pid":"P00736117LZ","t":"Construction of Bank Protection Structure along Bicol River, San Roque Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAPIDWORKZ CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":96456652.25,"abc":96456652.25,"fy":"2023","sd":"02/17/2023","cd":"2023-07-24","lat":13.458554,"lon":123.267524,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.13,"wp":[13.4583,123.26874],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4981},{"i":6452,"cid":"24GG0020","pid":"P00820393VS","t":"Construction of Flood Control Structure along Jalaur River, Barangay Bongco, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":34169585.46,"abc":34300000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-08-11","lat":10.852411,"lon":122.654231,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.01,"wp":[10.85242,122.65433],"wst":"matched","br":"Bongco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4982},{"i":6453,"cid":"22DM0039","pid":"P00620861LZ","t":"Construction of Flood Control Structure along Catanauan River (Sta. 3+625 - Sta. 4+000) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO. / JELCON-CONSTRUCTION AND TRADING CORPORATION","c":68997500.0,"abc":68997339.85,"fy":"2022","sd":"02/16/2022","cd":"2023-02-10","lat":13.605542,"lon":122.318922,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.02,"wp":[13.60569,122.31899],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":46.38,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 46 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":507},{"i":6454,"cid":"24FD0003","pid":"P00821409LZ","t":"Construction of Sipocot River Flood Mitigation Structure (Barangay Tapi Section), Lupi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":67549956.01,"abc":67549956.03,"fy":"2024","sd":"02/16/2024","cd":"2024-06-25","lat":13.783094,"lon":122.926581,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":"Sipocot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tapi Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4983},{"i":6455,"cid":"24HO0117","pid":"P00834571VS","t":"Construction of Dike at Barangay Montañeza - Barangay Lombo, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JTC CRUZ CONSTRUCTION CO., INC.","c":57895064.01,"abc":57895364.01,"fy":"2024","sd":"04/01/2024","cd":"2024-08-14","lat":9.685073,"lon":123.339018,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[6433],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 206,390,129.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":849},{"i":6456,"cid":"23GK0069","pid":"P00732020VS","t":"Construction of Drainage System, Barangay Zone 12, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":5443341.3,"abc":5444918.82,"fy":"2023","sd":"02/13/2023","cd":"2023-05-01","lat":10.73855,"lon":122.97008,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 12","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4984},{"i":6457,"cid":"23FN0018","pid":"P00736115LZ","t":"Construction of Bank Protection Structure along Pawili River, Brgy. Salvacion-San Roque Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":67539164.0,"abc":67539164.0,"fy":"2023","sd":"02/17/2023","cd":"2023-08-18","lat":13.46026,"lon":123.26809,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.46002,123.26823],"wst":"matched","br":"Salvacion-San Roque Section","len":null,"ph":null,"dup":[6466],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 164,017,492.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":850},{"i":6458,"cid":"24GL0044","pid":"P00820003VS","t":"Construction of Binalbagan River Bank Slope Protection at Barangay Bagroy, Binalbagan, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":67549997.3,"abc":67550000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-09","lat":10.203649,"lon":122.926797,"sm":204,"fm":204,"tm":204,"am":204,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.20379,122.92652],"wst":"matched","br":"Bagroy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4985},{"i":6459,"cid":"22GP0056","pid":"P00620301VS","t":"Construction of River Control along Panay River Basin, Poblacion Proper, Jamindan, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"JAMINDAN (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":42629655.34,"abc":42630000.0,"fy":"2022","sd":"02/15/2022","cd":"2023-12-22","lat":11.40682,"lon":122.51174,"sm":662,"fm":662,"tm":662,"am":662,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":15.37,"wp":[11.28305,122.57581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4986},{"i":6460,"cid":"23GL0080","pid":"P00733732VS","t":"Construction of Binalbagan River Bank Slope Protection at HDA Antolanga, Brgy. Tinongan, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-12-04","lat":10.247832,"lon":123.030957,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.02,"wp":[10.24797,123.03083],"wst":"matched","br":"Tinongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4987},{"i":6461,"cid":"24GI0057","pid":"P00821138VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Brgy. Balabag and Jibao-an, Sta. Barbara, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SANTA BARBARA (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":72373092.54,"abc":72375000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-12-13","lat":10.778848,"lon":122.513642,"sm":1371,"fm":1371,"tm":1371,"am":1371,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balabag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4988},{"i":6462,"cid":"22HO0039","pid":"P00620019VS","t":"Construction of Alegria Seawall, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":86844519.15,"abc":86844519.15,"fy":"2022","sd":"02/21/2022","cd":"2022-10-03","lat":9.727868,"lon":123.339137,"sm":29,"fm":29,"tm":29,"am":29,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4989},{"i":6463,"cid":"24GG0150","pid":"P00821142VS","t":"Construction of Flood Mitigation Structure along Jalaur River, San Enrique, Iloilo (Section 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN ENRIQUE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":96499845.49,"abc":96500000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-12-01","lat":11.068473,"lon":122.656447,"sm":1266,"fm":1266,"tm":1266,"am":1266,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.01,"wp":[11.06844,122.65637],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4990},{"i":6464,"cid":"23DM0044","pid":"P00726587LZ","t":"Construction of Flood Control Structure along Catanauan River, Sta. 3 + 250 - Sta. 3 + 675, Right Side, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"R.A. MENDIOLA CONSTRUCTION & DEVELOPER","c":77200000.0,"abc":77199944.15,"fy":"2023","sd":"03/06/2023","cd":"2024-06-02","lat":13.60577,"lon":122.321067,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.03,"wp":[13.60552,122.321],"wst":"matched","br":null,"len":425.0,"ph":null,"dup":[],"run":[6447,6343],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23DM0042 to 23DM0044) cover the same site, together worth PHP 212,300,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":401},{"i":6465,"cid":"24GK0077","pid":"P00832639VS","t":"Construction of Flood Control Structure, Barangay Zone 16, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":9897916.56,"abc":9899996.76,"fy":"2024","sd":"02/14/2024","cd":"2024-06-02","lat":10.7483,"lon":122.97009,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 16","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4991},{"i":6466,"cid":"23FN0026","pid":"P00736119LZ","t":"Construction of Bank Protection Structure along Bicol River (Main Tributary), San Jose-Palsong Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96478328.0,"abc":96478328.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-15","lat":13.46026,"lon":123.26809,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.13,"wp":[13.45959,123.26904],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6457],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 164,017,492.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":777},{"i":6467,"cid":"23GO0019","pid":"P00721636VS","t":"Construction of Revetment with Floodwall in Tangub Creek, Bacolod City Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-09","lat":10.63743,"lon":122.930852,"sm":95,"fm":95,"tm":null,"am":95,"md":0.0,"ls":"inside","ww":"Tangub","wn":"Tangub Creek","wd":0.0,"wp":[10.63743,122.93086],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4992},{"i":6468,"cid":"24GK0186","pid":"P00834999VS","t":"Construction of Flood Control System, Brgy Alicante, Enrique B. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49497759.51,"abc":49499996.88,"fy":"2024","sd":"03/13/2024","cd":"2024-10-13","lat":10.90254,"lon":123.03163,"sm":548,"fm":548,"tm":548,"am":548,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alicante","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4993},{"i":6469,"cid":"23HL0006","pid":"P00721853VS","t":"Construction of Siaton River Control (Downstream A), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"JANUARY BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-22","lat":9.054444,"lon":123.032222,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Siaton","wn":"Siaton River","wd":0.05,"wp":[9.05415,123.03184],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4994},{"i":6470,"cid":"22GF0001","pid":"P00620088VS","t":"Construction of Nahapay - Tagpu-an River Flood Control Project, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":4851531.95,"abc":4900000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-04","lat":10.732135,"lon":122.321257,"sm":599,"fm":599,"tm":599,"am":1597,"md":0.07,"ls":"boundary","ww":"Tagpu-an","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4995},{"i":6471,"cid":"24JG0041","pid":"P00821214MN","t":"Construction of Flood Control Structure along Dipili River, Barangay Dipili, Bayog, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"BAYOG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":39200000.0,"abc":39200000.0,"fy":"2024","sd":"05/09/2024","cd":"2024-12-05","lat":7.857807,"lon":123.032612,"sm":196,"fm":196,"tm":196,"am":196,"md":0.0,"ls":"inside","ww":"Dipili","wn":"Dipili River","wd":0.03,"wp":[7.85762,123.03242],"wst":"matched","br":"Dipili","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4996},{"i":6472,"cid":"23HO0055","pid":"P00721897VS","t":"Construction of Revetment Wall along Alegria River, Alegria, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96014645.0,"abc":96015752.6,"fy":"2023","sd":"03/23/2023","cd":"2023-08-14","lat":9.723586,"lon":123.339582,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Alegria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4997},{"i":6473,"cid":"23DM0081","pid":"P00742167LZ","t":"Construction of Flood Control Structures along Catanauan River, Package A, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"LIBRIUS CONSTRUCTION & SUPPLY CORPORATION / JEMAK CONSTRUCTION & SUPPLY","c":74250000.0,"abc":72374756.44,"fy":"2023","sd":"09/08/2023","cd":"2024-06-14","lat":13.605214,"lon":122.322,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.01,"wp":[13.6053,122.32201],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"records","s":51,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":46.52,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":186},{"i":6474,"cid":"24HL0026","pid":"P00820407VS","t":"Construction of Siaton River Control (Downstream A), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":48368880.0,"abc":48368880.0,"fy":"2024","sd":"03/11/2024","cd":"2024-08-07","lat":9.049906,"lon":123.032664,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Siaton","wn":"Siaton River","wd":0.06,"wp":[9.04983,123.03217],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4998},{"i":6475,"cid":"23HK0062","pid":"P00721842VS","t":"Rehabilitation of Ocoy River Control, Magatas, Sibulan, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIBULAN (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-09-20","lat":9.33646,"lon":123.26878,"sm":1446,"fm":1446,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":"Ocoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":4999},{"i":6476,"cid":"21FC0143","pid":"P00561417LZ","t":"Concreting of Drainage System, Brgy. Lag-on, Daet, Camarines Norte","w":"Construction of Drainage Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"Daet","deo":"Camarines Norte District Engineering Office","co":"ARIK CONSTRUCTION","c":14849998.78,"abc":14849998.78,"fy":"2021","sd":"03/17/2022","cd":"2022-12-23","lat":14.106214,"lon":122.931928,"sm":471,"fm":null,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lag-on","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5000},{"i":6477,"cid":"22GI0013","pid":"P00620238VS","t":"Construction of Aganan Flood Control Project (Jaro-Aganan River), Brgy. Balabag to Brgy. Buyo, Sta. Barbara, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SANTA BARBARA (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED / GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":91275340.05,"abc":91276455.0,"fy":"2022","sd":"02/21/2022","cd":"2023-04-19","lat":10.776733,"lon":122.515217,"sm":1371,"fm":1371,"tm":1371,"am":1371,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balabag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5001},{"i":6478,"cid":"24GG0148","pid":"P00820396VS","t":"Construction of Flood Control Structure along Jalaur River, Barangay Tuburan, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"J.S. LAYSON & CO. , INC.","c":33958511.47,"abc":34300000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-09-01","lat":10.84408,"lon":122.657625,"sm":1167,"fm":1167,"tm":1167,"am":538,"md":0.76,"ls":"boundary","ww":"Jalaur","wn":"Jalaur River","wd":0.4,"wp":[10.84159,122.655],"wst":"matched","br":"Tuburan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5002},{"i":6479,"cid":"23FD0018","pid":"P00740485LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Manangle Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":82024902.06,"abc":82024908.85,"fy":"2023","sd":"04/19/2023","cd":"2024-01-02","lat":13.781867,"lon":122.932042,"sm":1464,"fm":1464,"tm":1464,"am":832,"md":0.03,"ls":"boundary","ww":"Libmanan","wn":"Libmanan River","wd":0.04,"wp":[13.78202,122.93241],"wst":"matched","br":"Manangle Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5003},{"i":6480,"cid":"23F00240","pid":"P00737370LZ","t":"Construction of Flood Mitigation Structure, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":7674011.94,"abc":7919998.19,"fy":"2023","sd":"07/07/2023","cd":"2023-10-03","lat":14.0963,"lon":122.9713,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5004},{"i":6481,"cid":"23HO0060","pid":"P00721948VS","t":"Construction of Revetment Wall along Malbog River, Alegria, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48900211.81,"abc":48900215.48,"fy":"2023","sd":"03/06/2023","cd":"2023-08-22","lat":9.743242,"lon":123.341061,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Malbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5005},{"i":6482,"cid":"21HK0084","pid":"P00549968VS","t":"Reconstruction/ Rehabilitation of Ocoy River Control, Calabnugan, Sibulan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"Sibulan","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":93605000.0,"abc":93605000.0,"fy":"2021","sd":"10/22/2021","cd":"2022-10-31","lat":9.35678,"lon":123.27345,"sm":1446,"fm":null,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":"Ocoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6485],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 161,155,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1058},{"i":6483,"cid":"24GG0154","pid":"P00834565VS","t":"Construction of Flood Control Structure, Barangay Pandan, Dingle, Ilollo","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"DINGLE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":95543504.1,"abc":96500000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-12-16","lat":10.966024,"lon":122.659158,"sm":516,"fm":516,"tm":516,"am":516,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pandan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5006},{"i":6484,"cid":"23FE0067","pid":"P00726959LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Aslong, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-19","lat":13.691026,"lon":123.034581,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.11,"wp":[13.69172,123.03527],"wst":"matched","br":"Aslong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5007},{"i":6485,"cid":"22HK0042","pid":"P00620047VS","t":"Reconstruction of Ocoy River Control, Sibulan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIBULAN (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-14","lat":9.35678,"lon":123.27345,"sm":1446,"fm":1446,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":"Ocoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6482],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 161,155,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1086},{"i":6486,"cid":"23GP0006","pid":"P00721808VS","t":"Construction of River Control along Panay River Basin, Barangay Poblacion Sur, Sigma, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"SIGMA (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":47033663.89,"abc":47039244.65,"fy":"2023","sd":"03/13/2023","cd":"2024-05-30","lat":11.42422,"lon":122.65926,"sm":1452,"fm":1452,"tm":1452,"am":1452,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":4.26,"wp":[11.40088,122.69036],"wst":"matched","br":"Poblacion Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.56,"value":4.26,"text":"The title names Panay, which OpenStreetMap maps through the stated municipality, but the pin is 4.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":368},{"i":6487,"cid":"22DM0053","pid":"P00620860LZ","t":"Construction of Flood Control Structure along Catanauan River (Sta. 3+250 - Sta. 3+625) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":68997500.0,"abc":68997384.32,"fy":"2022","sd":"02/16/2022","cd":"2022-10-03","lat":13.605117,"lon":122.322569,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.02,"wp":[13.60527,122.32255],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":46.55,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":508},{"i":6488,"cid":"24F00149","pid":"P00820464LZ","t":"Construction of Flood Mitigation Structure along Barangay Mantugawe and Barangay Pagsangahan, Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":96499986.42,"abc":96499986.42,"fy":"2024","sd":"03/19/2024","cd":"2024-10-31","lat":14.0263,"lon":122.9322,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mantugawe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5008},{"i":6489,"cid":"23GJ0028","pid":"P00733724VS","t":"Construction of Drainage System in Arevalo, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"PAG BUILDERS","c":4945183.08,"abc":4950000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-30","lat":10.688872,"lon":122.5159,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5009},{"i":6490,"cid":"23GK0067","pid":"P00732018VS","t":"Construction of Drainage System, Barangay Zone 1, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":4947882.0,"abc":4949996.87,"fy":"2023","sd":"02/13/2023","cd":"2023-05-01","lat":10.74677,"lon":122.97141,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5010},{"i":6491,"cid":"23GO0018","pid":"P00721473VS","t":"Construction of Revetment with Floodwall in Loygoy River, Bacolod City Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":91675000.0,"abc":91675000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-03-12","lat":10.667438,"lon":123.036886,"sm":95,"fm":95,"tm":null,"am":95,"md":0.0,"ls":"inside","ww":"Loygoy","wn":"Logoy Creek","wd":0.0,"wp":[10.66745,123.03689],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5011},{"i":6492,"cid":"23HO0237","pid":"P00745604VS","t":"Repair/ Rehabilitation/ Reconstruction of Damaged Alegria River Flood Control System (Upstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+252.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":94373513.88,"abc":94373514.16,"fy":"2023","sd":"08/10/2023","cd":"2024-06-08","lat":9.726432,"lon":123.341848,"sm":29,"fm":29,"tm":362,"am":29,"md":0.0,"ls":"inside","ww":"Damaged Alegria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":252.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":81.5,"text":"The record contradicts itself: the municipality field and the pin point to Alegria, Cebu, but the title names Cebu City, Cebu, 82 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":484},{"i":6493,"cid":"23GK0004","pid":"P00721738VS","t":"Construction of Flood Control Structure, Imbang River, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96497998.12,"abc":96499981.33,"fy":"2023","sd":"02/14/2023","cd":"2023-12-11","lat":10.82684,"lon":122.97147,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":9.9,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6502,6509],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.68,"value":9.9,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 9.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.25,"value":2,"text":"2 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 289,497,993.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":116},{"i":6494,"cid":"23GG0126","pid":"P00721931VS","t":"Construction of Flood Control/Slope Protection along Suage River,Brgy. Damires, Janiuay, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MINA (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"CONTE BUILDERS & CONSTRUCTION SUPPLY","c":29095198.81,"abc":29400000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-28","lat":10.959429,"lon":122.516103,"sm":663,"fm":976,"tm":663,"am":663,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.22,"wp":[10.95852,122.51432],"wst":"matched","br":"Damires","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.61,"text":"The record contradicts itself: the title and the pin point to Janiuay, Iloilo, but the municipality field names Mina, Iloilo, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":594},{"i":6495,"cid":"24JG0013","pid":"P00820244MN","t":"Construction of Sibuguey River Flood Control Project, Phase IV, Barangay Poblacion, Bayog, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"BAYOG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":66467270.0,"abc":66467270.0,"fy":"2024","sd":"03/22/2024","cd":"2024-11-06","lat":7.835471,"lon":123.037702,"sm":196,"fm":196,"tm":196,"am":196,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.04,"wp":[7.8353,123.03798],"wst":"matched","br":"Poblacion","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5012},{"i":6496,"cid":"21HN0071","pid":"P00549977VS","t":"Construction of Flood Control/Drainage in barangays Marigondon Phase 2, Basak and Babag, Lapu-Lapu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Lapu-Lapu City","deo":"Cebu 6th District Engineering Office","co":"GOLDFIN CONSTRUCTION & DEVELOPMENT CORPORATION (FORMERLY: GOLDFIN CONSTRUCTION)","c":9148241.83,"abc":9900000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-08-02","lat":10.275793,"lon":123.275656,"sm":754,"fm":null,"tm":754,"am":388,"md":70.0,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marigondon Phase 2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":70.0,"text":"The pin is 70.0 km outside Lapu-Lapu City, Cebu, the nearest municipality the record claims. It falls in City of Guihulngan, Negros Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":262},{"i":6497,"cid":"22GP0076","pid":"P00620460VS","t":"Construction of River Control Structure along Panay River Basin, Barangay Sto. Angel, Sta. 0 + 000 - Sta. 0 + -272.80, Dumalag, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMALAG (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":44098309.82,"abc":44098402.91,"fy":"2022","sd":"04/06/2022","cd":"2023-09-15","lat":11.30918,"lon":122.65943,"sm":535,"fm":535,"tm":535,"am":535,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.02,"wp":[11.30933,122.65943],"wst":"matched","br":"Sto. Angel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5013},{"i":6498,"cid":"22FC0046","pid":"P00631402LZ","t":"Construction of Flood Control, Barangay San Franciso, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":19368185.9,"abc":19599273.46,"fy":"2022","sd":"03/17/2022","cd":"2022-08-18","lat":14.142911,"lon":122.932289,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Franciso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5014},{"i":6499,"cid":"22DM0009","pid":"P00620857LZ","t":"Construction of Flood Control Structure along Catanauan River (Sta. 1+625 - Sta. 2+000) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":68997500.0,"abc":68997457.22,"fy":"2022","sd":"02/16/2022","cd":"2023-02-10","lat":13.597697,"lon":122.322884,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.05,"wp":[13.59729,122.32293],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[6527,6513],"cl":[],"L":"records","s":52,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":47.34,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DM0007 to 22DM0009) cover the same site, together worth PHP 192,392,364.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":172},{"i":6500,"cid":"24JD0014","pid":"P00820133MN","t":"Rehabilitation of Flood Control Structure along Labason River (Downstream -Labason Side), Labason, Zamboanga del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LABASON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"LONG ISLAND BUILDERS & CONSTRUCTION","c":34300000.0,"abc":34300000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-14","lat":8.06829,"lon":122.51667,"sm":728,"fm":728,"tm":728,"am":728,"md":0.0,"ls":"inside","ww":"Labason","wn":"Labason River","wd":0.03,"wp":[8.06816,122.51638],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5015},{"i":6501,"cid":"22FC0083","pid":"P00631387LZ","t":"Construction of Daet River Control Structure, Alawihao Section, Barangay Alawihao, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":42139793.86,"abc":42139793.86,"fy":"2022","sd":"03/25/2022","cd":"2022-11-25","lat":14.104658,"lon":122.932708,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.03,"wp":[14.10443,122.93277],"wst":"matched","br":"Alawihao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5016},{"i":6502,"cid":"24GK0010","pid":"P00820282VS","t":"Construction of Flood Control Structure of Imbang River (Upstream), Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":96499999.99,"abc":96499999.97,"fy":"2024","sd":"02/19/2024","cd":"2025-03-12","lat":10.82684,"lon":122.97147,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":9.9,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6493,6509],"run":[],"cl":[],"L":"records","s":62,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.68,"value":9.9,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 9.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 289,497,993.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":86},{"i":6503,"cid":"24FF0065","pid":"P00846118LZ","t":"Construction of Flood Control Structure, Brgy. San Vicente, Pili, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PILI (CAPITAL) (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"BENJOSH CONSTRUCTION SUPPLY","c":4889297.34,"abc":4949973.51,"fy":"2024","sd":"05/28/2024","cd":"2024-08-08","lat":13.555566,"lon":123.277679,"sm":1137,"fm":1137,"tm":1137,"am":1137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5017},{"i":6504,"cid":"23DM0048","pid":"P00736019LZ","t":"Construction of Catanauan Seawall, Barangay 5 - Barangay Madulao, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL","c":96500000.0,"abc":96499959.25,"fy":"2023","sd":"03/14/2023","cd":"2024-03-05","lat":13.58859,"lon":122.32404,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5018},{"i":6505,"cid":"22HO0077","pid":"P00620453VS","t":"Construction of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Felomina, Sta. 0 + 000 - Sta. 0 + 167.00, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999988.97,"abc":48999988.97,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.750125,"lon":123.342131,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Felomina","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5019},{"i":6506,"cid":"24JD0013","pid":"P00820132MN","t":"Rehabilitation of Flood Control Structure along Labason River (Downstream - Osukan Side), Labason, Zamboanga del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LABASON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"DEBRIS ENTERPRISES AND CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-05-26","lat":8.06816,"lon":122.51669,"sm":728,"fm":728,"tm":728,"am":728,"md":0.0,"ls":"inside","ww":"Labason","wn":"Labason River","wd":0.03,"wp":[8.06805,122.51643],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5020},{"i":6507,"cid":"22GK0012","pid":"P00620255VS","t":"Construction of Flood Control Structure of Malogo River (Both Stream) along Bacolod North Rd, Abut. \"B\", Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":91672987.0,"abc":91674987.7,"fy":"2022","sd":"02/22/2022","cd":"2023-01-01","lat":10.892778,"lon":123.038333,"sm":437,"fm":437,"tm":437,"am":548,"md":0.05,"ls":"boundary","ww":"Malogo","wn":"Malogo River","wd":0.05,"wp":[10.89286,123.03881],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5021},{"i":6508,"cid":"24HL0042","pid":"P00820406VS","t":"Construction of River Control along Sicopong River, Amio, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-10-01","lat":9.414299,"lon":122.93446,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Sicopong","wn":"Sicopong River","wd":0.3,"wp":[9.41703,122.93413],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5022},{"i":6509,"cid":"24GK0012","pid":"P00820284VS","t":"Construction of Flood Control Structure of Imbang River, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96499995.02,"abc":96499993.37,"fy":"2024","sd":"02/19/2024","cd":"2024-09-25","lat":10.82684,"lon":122.97147,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":9.9,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6493,6502],"run":[],"cl":[],"L":"records","s":62,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.68,"value":9.9,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 9.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 289,497,993.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":87},{"i":6510,"cid":"20JB0060","pid":"P00443081MN","t":"Construction/rehabilitation of slope protection and drainage, Brgy. Uno Creek, Katipunan, Zamboanga del Norte","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"Katipunan","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"D' DREAMER DEVELOPMENT CORPORATION","c":6913195.24,"abc":6930000.0,"fy":"2020","sd":"11/27/2020","cd":"2023-03-31","lat":8.510735,"lon":123.279975,"sm":702,"fm":null,"tm":702,"am":702,"md":0.0,"ls":"inside","ww":"Brgy. Uno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Uno Creek","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5023},{"i":6511,"cid":"22HO0079","pid":"P00620452VS","t":"Construction of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Felomina - Brgy. Madridejos, Sta. 0 + 000 - Sta. 0 + 167.00, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999987.89,"abc":48999987.89,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.750614,"lon":123.34216,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Felomina","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5024},{"i":6512,"cid":"24GG0114","pid":"P00820390VS","t":"Construction of Flood Control Structure along Jalaur River in Dingle, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DINGLE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":9750012.74,"abc":9800000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-08","lat":10.969479,"lon":122.659479,"sm":516,"fm":516,"tm":635,"am":516,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.06,"wp":[10.96914,122.65993],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":22.98,"text":"The record contradicts itself: the municipality field and the pin point to Dingle, Iloilo, but the title names Iloilo City, Iloilo, 23 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":629},{"i":6513,"cid":"22DM0008","pid":"P00620858LZ","t":"Construction of Flood Control Structure along Catanauan River (Sta. 2+000 - Sta. 2+375 Left-Side) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.","c":68515000.0,"abc":68514957.9,"fy":"2022","sd":"02/16/2022","cd":"2023-05-19","lat":13.599667,"lon":122.324883,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.02,"wp":[13.59966,122.32474],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[6527,6499],"cl":[],"L":"records","s":52,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":47.2,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DM0007 to 22DM0009) cover the same site, together worth PHP 192,392,364.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":173},{"i":6514,"cid":"22E00145","pid":"P00631318LZ","t":"Construction of Danao Flood Control Structure (Phase 2), Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"MAGDIWANG (ROMBLON)","deo":"Romblon District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":24068307.9,"abc":48999906.45,"fy":"2022","sd":"10/11/2022","cd":"2023-07-31","lat":12.485262,"lon":122.519375,"sm":866,"fm":866,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5025},{"i":6515,"cid":"22GK0021","pid":"P00620107VS","t":"Construction of Flood Control Structure, Malogo River, Abutment \"B\", Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":48998000.0,"abc":48999980.49,"fy":"2022","sd":"02/08/2022","cd":"2022-09-23","lat":10.892778,"lon":123.038889,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.01,"wp":[10.89277,123.03883],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5026},{"i":6516,"cid":"22HL0082","pid":"P00633018VS","t":"Construction of Giligaon River Control, Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"H.L.J CONSTRUCTION & ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-12-11","lat":9.09972,"lon":122.93528,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Giligaon","wn":"Giliga-on River","wd":0.03,"wp":[9.0998,122.93556],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5027},{"i":6517,"cid":"21GO0074","pid":"P00521587VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank (with Esplanade) along Catmon Creek, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"Bacolod City","deo":"Bacolod City District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":34300000.0,"abc":34300000.0,"fy":"2021","sd":"10/07/2021","cd":"2022-07-25","lat":10.690286,"lon":122.971472,"sm":95,"fm":null,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Catmon","wn":"Catmon River","wd":1.53,"wp":[10.68653,122.95803],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5028},{"i":6518,"cid":"23FN0012","pid":"P00736107LZ","t":"Construction of Bank Protection Structure along Antipolo River, San Francisco Section, Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96428308.59,"abc":96429566.0,"fy":"2023","sd":"02/17/2023","cd":"2024-02-06","lat":13.43468,"lon":123.34412,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":"Antipolo","wn":"Antipolo River","wd":4.7,"wp":[13.40108,123.37076],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5029},{"i":6519,"cid":"22FE0042","pid":"P00620717LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Aslong, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":48015655.63,"abc":49000000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-10-06","lat":13.688519,"lon":123.040485,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.08,"wp":[13.68918,123.04069],"wst":"matched","br":"Aslong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5030},{"i":6520,"cid":"23GG0119","pid":"P00721934VS","t":"Construction of Flood Control/Slope Protection along Jalaur River, Dingle, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":23763658.51,"abc":24500000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-12-20","lat":10.969458,"lon":122.659501,"sm":516,"fm":538,"tm":516,"am":516,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.06,"wp":[10.96914,122.65993],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":22,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":10.76,"text":"The record contradicts itself: the title and the pin point to Dingle, Iloilo, but the municipality field names Dumangas, Iloilo, 11 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":595},{"i":6521,"cid":"23HL0056","pid":"P00721956VS","t":"Construction of Amio River Control Structure along Sicopong River, Sta. Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":36260000.0,"abc":36260000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-11-01","lat":9.41722,"lon":122.93611,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Amio","wn":"Amio River","wd":0.48,"wp":[9.41423,122.9329],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5031},{"i":6522,"cid":"22J00049","pid":"P00620197MN","t":"Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":104499773.7,"abc":104500000.4,"fy":"2022","sd":"02/22/2022","cd":"2023-06-30","lat":7.76032,"lon":122.9727,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.04,"wp":[7.76033,122.97303],"wst":"matched","br":"Paradise","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5032},{"i":6523,"cid":"20JB0060","pid":"P00443081MN","t":"Construction/rehabilitation of slope protection and drainage, Brgy. Uno Creek, Katipunan, Zamboanga del Norte","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"Katipunan","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"D' DREAMER DEVELOPMENT CORPORATION","c":6913195.24,"abc":6930000.0,"fy":"2021","sd":"11/27/2020","cd":"2023-03-31","lat":8.510735,"lon":123.279975,"sm":702,"fm":null,"tm":702,"am":702,"md":0.0,"ls":"inside","ww":"Brgy. Uno","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Uno Creek","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5033},{"i":6524,"cid":"22E00145","pid":"P00631321LZ","t":"Construction of Ituralba Flood Control Structure (Phase 2), Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"MAGDIWANG (ROMBLON)","deo":"Romblon District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":24067723.15,"abc":48999906.45,"fy":"2022","sd":"10/11/2022","cd":"2023-07-31","lat":12.485262,"lon":122.519375,"sm":866,"fm":866,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5034},{"i":6525,"cid":"21E00075","pid":"P00561579LZ","t":"Construction of Jao-asan Flood Control, Jao-asan, Magdiwang, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"Magdiwang","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48184309.17,"abc":48248385.32,"fy":"2021","sd":"03/24/2022","cd":"2022-12-07","lat":12.472677,"lon":122.521591,"sm":866,"fm":null,"tm":866,"am":866,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5035},{"i":6526,"cid":"23GQ0042","pid":"P00721873VS","t":"Construction of Flood Control Structure of Himugaan River, Brgy. Minapasok, Calatrava, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CALATRAVA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":38212514.85,"abc":38599746.44,"fy":"2023","sd":"04/05/2023","cd":"2023-10-04","lat":10.69854,"lon":123.34518,"sm":299,"fm":299,"tm":299,"am":299,"md":0.0,"ls":"inside","ww":"Himugaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Minapasok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5036},{"i":6527,"cid":"22DM0007","pid":"P00620859LZ","t":"Construction of Flood Control Structure along Catanauan River (Sta. 2+000 - Sta. 2+375 Right-Side) Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":54879864.36,"abc":68514978.22,"fy":"2022","sd":"02/21/2022","cd":"2023-02-15","lat":13.599959,"lon":122.324886,"sm":351,"fm":351,"tm":1188,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.02,"wp":[13.59991,122.32469],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[6513,6499],"cl":[],"L":"records","s":51,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":47.17,"text":"The record contradicts itself: the municipality field and the pin point to Catanauan, Quezon, but the title names Quezon, Quezon, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22DM0007 to 22DM0009) cover the same site, together worth PHP 192,392,364.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":187},{"i":6528,"cid":"23FE0079","pid":"P00726961LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Potot, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-10-17","lat":13.688474,"lon":123.040615,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.08,"wp":[13.68915,123.04081],"wst":"matched","br":"Potot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5037},{"i":6529,"cid":"21GG0106","pid":"P00521771VS","t":"Construction of Flood Control/Slope Protection along Jalaur River in Dingle, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":9309957.28,"abc":9800000.0,"fy":"2021","sd":"03/29/2022","cd":"2022-10-31","lat":10.968872,"lon":122.659637,"sm":635,"fm":null,"tm":635,"am":516,"md":22.93,"ls":"outside","ww":"Jalaur","wn":"Jalaur River","wd":0.02,"wp":[10.96881,122.65978],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.95,"value":22.93,"text":"The pin is 22.9 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Dingle, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":278},{"i":6530,"cid":"23HK0061","pid":"P00721844VS","t":"Construction of Namangyan River Control, Mabinay, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MABINAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-09-13","lat":9.73327,"lon":122.93708,"sm":841,"fm":841,"tm":841,"am":841,"md":0.0,"ls":"inside","ww":"Namangyan","wn":"Namanyan River","wd":0.62,"wp":[9.73443,122.93157],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5038},{"i":6531,"cid":"23J00222","pid":"P00721403MN","t":"Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 3","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"DIPLAHAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"DL ENTERPRISES","c":48249820.66,"abc":48250000.0,"fy":"2023","sd":"07/21/2023","cd":"2024-04-17","lat":7.75586,"lon":122.97388,"sm":519,"fm":519,"tm":519,"am":519,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.04,"wp":[7.75572,122.97419],"wst":"matched","br":"Paradise","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5039},{"i":6532,"cid":"22GJ0019","pid":"P00620011VS","t":"Construction of Revetment Wall at Calajunan Creek, Arevalo, Iloilo City","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":52330984.82,"abc":52331467.5,"fy":"2022","sd":"02/21/2022","cd":"2023-02-08","lat":10.695851,"lon":122.521818,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":"Calajunan","wn":"Calajunan Creek","wd":0.75,"wp":[10.69948,122.51598],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5040},{"i":6533,"cid":"23HL0062","pid":"P00721954VS","t":"Construction of Drainage Canal along Dumaguete South Road, Dauin, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"DAUIN (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MG CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-11","lat":9.214722,"lon":123.281111,"sm":498,"fm":498,"tm":498,"am":498,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5041},{"i":6534,"cid":"24DM0057","pid":"P00821324LZ","t":"Construction of Flood Control Structure along Catanauan River, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96499932.85,"fy":"2024","sd":"02/14/2024","cd":"2024-12-03","lat":13.60248,"lon":122.32494,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":"Catanauan","wn":"Catanauan River","wd":0.03,"wp":[13.60265,122.32472],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5042},{"i":6535,"cid":"22HO0078","pid":"P00633229VS","t":"Construction of Seawall Protection Works along Santander-Barili-Toledo Road, Barangay Madridejos, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":49499923.49,"abc":49499923.49,"fy":"2022","sd":"03/24/2022","cd":"2022-10-26","lat":9.7723,"lon":123.34553,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madridejos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5043},{"i":6536,"cid":"24GG0052","pid":"P00820395VS","t":"Construction of Flood Control Structure along Jalaur River, Barangay Cansilayan, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":32875340.04,"abc":34300000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-27","lat":10.893489,"lon":122.662917,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.05,"wp":[10.89372,122.66335],"wst":"matched","br":"Cansilayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5044},{"i":6537,"cid":"22GK0020","pid":"P00620106VS","t":"Construction of Flood Control Structure, Malogo River, Abutment \"A\", EB Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48997994.0,"abc":48999980.49,"fy":"2022","sd":"02/08/2022","cd":"2022-09-23","lat":10.907222,"lon":123.041944,"sm":548,"fm":548,"tm":null,"am":548,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.05,"wp":[10.90766,123.04206],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5045},{"i":6538,"cid":"23GO0020","pid":"P00721625VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Lacson Street, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-19","lat":10.104538,"lon":122.938462,"sm":95,"fm":95,"tm":95,"am":389,"md":53.26,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":53.26,"text":"The pin is 53.3 km outside Bacolod City, Negros Occidental, the nearest municipality the record claims. It falls in City of Himamaylan, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":222},{"i":6539,"cid":"23F00174","pid":"P00726774LZ","t":"Construction of Basud River Flood Mitigation Structure, Barangay Mocong, Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":125147336.6,"abc":125147545.1,"fy":"2023","sd":"03/31/2023","cd":"2023-09-06","lat":14.062503,"lon":122.973887,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":"Basud","wn":"Basud River","wd":0.05,"wp":[14.06273,122.97348],"wst":"matched","br":"Mocong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5046},{"i":6540,"cid":"22DM0110","pid":"P00639382LZ","t":"Construction of Seawall, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"RAPID FOREMOST CONST. CO.","c":96500000.0,"abc":96499953.91,"fy":"2022","sd":"04/04/2022","cd":"2023-01-21","lat":13.58782,"lon":122.325153,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5047},{"i":6541,"cid":"22G00081","pid":"P00620259VS","t":"Construction of Flood Control Structure, Bago River (Upstream - Right Side), Don Salvador Benedicto, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SALVADOR BENEDICTO (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48249938.13,"abc":48249583.32,"fy":"2022","sd":"03/02/2022","cd":"2022-09-10","lat":10.69887,"lon":123.34565,"sm":1245,"fm":1245,"tm":1245,"am":299,"md":4.71,"ls":"outside","ww":"Bago","wn":"Bago River","wd":22.55,"wp":[10.51584,123.25468],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.72,"value":4.71,"text":"The pin is 4.7 km outside Salvador Benedicto, Negros Occidental, the nearest municipality the record claims. It falls in Calatrava, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.8,"value":22.55,"text":"The title names Bago, which OpenStreetMap maps through the stated municipality, but the pin is 22.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":75},{"i":6542,"cid":"23FN0024","pid":"P00736113LZ","t":"Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":72319240.89,"abc":72320815.32,"fy":"2023","sd":"02/17/2023","cd":"2023-09-22","lat":13.485494,"lon":123.281474,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.02,"wp":[13.48547,123.28128],"wst":"matched","br":"Fabrica Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5048},{"i":6543,"cid":"24GG0152","pid":"P00821139VS","t":"Construction of Flood Mitigation Structure along Jalaur River, Brgy. Sohoton to Brgy. Patag, Barotac Nuevo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC NUEVO (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"EARLY RISER CONSTRUCTION / CMG JR. BUILDERS","c":72274190.79,"abc":72375000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-05-27","lat":10.946833,"lon":122.665739,"sm":168,"fm":168,"tm":168,"am":1167,"md":0.63,"ls":"boundary","ww":"Jalaur","wn":"Jalaur River","wd":0.21,"wp":[10.94812,122.66713],"wst":"matched","br":"Sohoton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5049},{"i":6544,"cid":"22GK0011","pid":"P00620254VS","t":"Construction of Flood Control Structure of Malogo River (Both Stream) along Bacolod North Rd, Abut. \"A\", EB. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":91673000.19,"abc":91674932.84,"fy":"2022","sd":"02/22/2022","cd":"2023-01-31","lat":10.899167,"lon":123.041944,"sm":548,"fm":548,"tm":null,"am":437,"md":0.04,"ls":"boundary","ww":"Malogo","wn":"Malogo River","wd":0.06,"wp":[10.89958,123.04157],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5050},{"i":6545,"cid":"23FD0009","pid":"P00736082LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Azucena Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024862.0,"abc":82024931.07,"fy":"2023","sd":"03/31/2023","cd":"2023-08-23","lat":13.764295,"lon":122.974132,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.06,"wp":[13.76454,122.97359],"wst":"matched","br":"Azucena Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5051},{"i":6546,"cid":"22FC0064","pid":"P00631384LZ","t":"Construction of Boulevard along River Control in Barangay Lag-on to Barangay Alawihao, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":29399160.79,"abc":29399160.79,"fy":"2022","sd":"03/11/2022","cd":"2022-08-29","lat":14.105222,"lon":122.938611,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lag-on","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5052},{"i":6547,"cid":"23DM0038","pid":"P00736018LZ","t":"Construction of Flood Control Mitigation Structure, Sitio Sapang Palay Barangay 10 and Cawayan Ibaba, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":96500000.0,"abc":96499982.12,"fy":"2023","sd":"03/06/2023","cd":"2023-12-06","lat":13.598223,"lon":122.327613,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"10","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5053},{"i":6548,"cid":"22HJ0029","pid":"P00620137VS","t":"Construction of Flood Control along Calamba River, Sta. 0+000 - Sta. 0+750, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MG CONSTRUCTION","c":14700000.0,"abc":14700000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-17","lat":10.17891,"lon":123.28153,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Calamba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[6556],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 44,100,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1130},{"i":6549,"cid":"22HO0050","pid":"P00620448VS","t":"Improvement of Riverbank, Sta. 0 + 000 - Sta. 0 + 651, Madredijos, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96499992.71,"abc":96499992.71,"fy":"2022","sd":"03/24/2022","cd":"2023-01-24","lat":9.787033,"lon":123.346208,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":651.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5054},{"i":6550,"cid":"22GA0120","pid":"P00620270VS","t":"Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"UNITEC BUILDER, INCORPORATED","c":49954779.27,"abc":49955155.0,"fy":"2022","sd":"03/17/2022","cd":"2023-02-10","lat":11.648202,"lon":122.328622,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.1,"wp":[11.64914,122.32866],"wst":"matched","br":"Palale","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5055},{"i":6551,"cid":"22FC0075","pid":"P00631408LZ","t":"Construction of Matoog Toog Seawall, Brgy. Matoog Toog, Mercedes, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"MERCEDES (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":40874089.92,"abc":42139682.6,"fy":"2022","sd":"03/17/2022","cd":"2022-11-14","lat":14.017581,"lon":123.042192,"sm":967,"fm":967,"tm":967,"am":967,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matoog Toog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5056},{"i":6552,"cid":"22FC0029","pid":"P00632951LZ","t":"Construction of Flood Mitigation Structure Bibirao-Magang-Camambugan Creek, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":4790497.46,"abc":4949927.33,"fy":"2022","sd":"03/21/2022","cd":"2022-07-25","lat":14.099297,"lon":122.939372,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Bibirao-Magang-Camambugan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5057},{"i":6553,"cid":"22FC0053","pid":"P00631383LZ","t":"Construction of Basud River Control , Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":42136788.85,"abc":42139665.94,"fy":"2022","sd":"03/11/2022","cd":"2022-09-12","lat":14.0648,"lon":122.974261,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":"Basud","wn":"Basud River","wd":0.04,"wp":[14.06463,122.97458],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5058},{"i":6554,"cid":"24GG0062","pid":"P00820294VS","t":"Construction of Flood Mitigation Structure along Jalaur River in Brgy. Callan to Guibuangan, Pototan, llollo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":118369503.2,"abc":120625000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-12-16","lat":10.927184,"lon":122.669062,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.04,"wp":[10.92728,122.66946],"wst":"matched","br":"Callan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5059},{"i":6555,"cid":"21J00027","pid":"P00522045MN","t":"Construction of Labason Flood Control at Antonino, Labason, Zamboanga Del Norte ( Upstream) Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"Labason","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"EDANNA CONSTRUCTION / BNR CONSTRUCTION & DEVELOPMENT CORP.","c":98946902.71,"abc":100646958.6,"fy":"2021","sd":"04/20/2021","cd":"2022-08-15","lat":8.059641,"lon":122.524215,"sm":728,"fm":null,"tm":728,"am":728,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5060},{"i":6556,"cid":"24HJ0021","pid":"P00820197VS","t":"Construction of Flood Control along Calamba River, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-10-27","lat":10.17891,"lon":123.28153,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Calamba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6548],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 44,100,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1117},{"i":6557,"cid":"24DM0130","pid":"P00844776LZ","t":"Rehabilitation of Drainage System, Public Market, Brgy. Madulao, Catanauan, Quezon","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"QUEZON","mu":"CATANAUAN (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"LAICAN ENTERPRISES INC.","c":14700000.0,"abc":14699915.51,"fy":"2024","sd":"05/20/2024","cd":"2024-10-21","lat":13.58792,"lon":122.32981,"sm":351,"fm":351,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madulao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5061},{"i":6558,"cid":"24HL0020","pid":"P00820210VS","t":"Construction of Canaway River Control (Upstream A), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-11","lat":9.061585,"lon":123.042576,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Canaway","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5062},{"i":6559,"cid":"22HO0072","pid":"P00633230VS","t":"Construction of Seawall Protection Works along Santander-Balili-Toledo Road, Barangay Madridejos, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":49499921.84,"abc":49499921.84,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.787224,"lon":123.346256,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madridejos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5063},{"i":6560,"cid":"21GO0083","pid":"P00549973VS","t":"Construction/Rehabilitation of Flood Control Structure, Barangay 14, Bacolod City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"Bacolod City","deo":"Bacolod City District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":8820000.0,"abc":8820000.0,"fy":"2021","sd":"10/07/2021","cd":"2022-08-31","lat":10.667207,"lon":122.940901,"sm":95,"fm":null,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"14","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5064},{"i":6561,"cid":"23FD0015","pid":"P00740486LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Gaongan Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82024049.2,"abc":82024111.07,"fy":"2023","sd":"04/19/2023","cd":"2023-12-22","lat":13.76917,"lon":122.974353,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.03,"wp":[13.76915,122.97461],"wst":"matched","br":"Gaongan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5065},{"i":6562,"cid":"21JF0011","pid":"P00522154MN","t":"Construction of Flood Control Structure along Lanao-Pagadian-Zamboanga City Road, Buluan River (Phase II) (Upstream), Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":null,"deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"JAYKRIS ENTERPRISES & CONSTRUCTION (FORMERLY: JAYKRIS ENTERPRISES)","c":42112247.18,"abc":43120000.0,"fy":"2021","sd":"02/17/2021","cd":"2023-11-28","lat":7.713338,"lon":122.527386,"sm":null,"fm":null,"tm":null,"am":647,"md":null,"ls":"unknown","ww":"Buluan","wn":"Bulu-an River","wd":0.01,"wp":[7.71346,122.52741],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":145},{"i":6563,"cid":"22GP0021","pid":"P00620273VS","t":"Construction of River Control along Panay River Basin, Brgy. Dayhagon, Sigma, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"SIGMA (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":55941243.48,"abc":55968658.91,"fy":"2022","sd":"03/01/2022","cd":"2024-02-06","lat":11.41406,"lon":122.66972,"sm":1452,"fm":1452,"tm":1452,"am":1452,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":2.68,"wp":[11.40088,122.69036],"wst":"matched","br":"Dayhagon","len":null,"ph":null,"dup":[6572],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,906,723.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":851},{"i":6564,"cid":"22GO0091","pid":"P00620079VS","t":"Construction of Flood Control Structure, Barangay 14, Bacolod City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":8820000.0,"abc":8820000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-01-16","lat":10.667599,"lon":122.941306,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"14","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5066},{"i":6565,"cid":"22F00144","pid":"P00621518LZ","t":"Construction/Improvement of Sipocot River Flood Mitigation Structures, Sipocot Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":89101796.39,"abc":89101796.39,"fy":"2022","sd":"06/27/2022","cd":"2023-05-20","lat":13.754024,"lon":122.974586,"sm":1464,"fm":1464,"tm":null,"am":1464,"md":0.0,"ls":"inside","ww":"Sipocot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5067},{"i":6566,"cid":"22GG0088","pid":"P00620245VS","t":"Construction of Flood Control Structure along Jalaur River in Calinog, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":34299712.36,"abc":34300000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-16","lat":11.12638,"lon":122.52824,"sm":306,"fm":306,"tm":635,"am":306,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.01,"wp":[11.12633,122.52817],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":38.17,"text":"The record contradicts itself: the municipality field and the pin point to Calinog, Iloilo, but the title names Iloilo City, Iloilo, 38 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":568},{"i":6567,"cid":"22F00054","pid":"P00620323LZ","t":"Construction/Rehabilitation of Pawili River Flood Mitigation Structure, Brgy. San Jose and Brgy. Bagumbayan, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":97103902.58,"abc":97103902.58,"fy":"2022","sd":"03/24/2022","cd":"2023-01-30","lat":13.479281,"lon":123.281614,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.4793,123.28188],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5068},{"i":6568,"cid":"24JG0043","pid":"P00821216MN","t":"Construction of Flood Control Structure, Barangay Colojo, Pitogo, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PITOGO (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":14679922.81,"abc":14700000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-04-29","lat":7.472028,"lon":123.346845,"sm":1149,"fm":1149,"tm":1149,"am":1149,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colojo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5069},{"i":6569,"cid":"22GF0129","pid":"P00620425VS","t":"Construction of Guimbal Shore Protection, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOOD FORTUNE INTERNATIONAL, INC.","c":9790031.39,"abc":9800000.0,"fy":"2022","sd":"08/05/2022","cd":"2022-12-15","lat":10.662975,"lon":122.330208,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5070},{"i":6570,"cid":"24HL0021","pid":"P00820209VS","t":"Construction of Canaway River Control (Downstream B), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-08-12","lat":9.061347,"lon":123.042715,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Canaway","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5071},{"i":6571,"cid":"23FD0032","pid":"P00740484LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Tara Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY / SHLA CONSTRUCTION AND SUPPLY","c":72374681.42,"abc":72374683.37,"fy":"2023","sd":"04/19/2023","cd":"2023-11-10","lat":13.754257,"lon":122.974832,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.01,"wp":[13.75435,122.97485],"wst":"matched","br":"Tara Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5072},{"i":6572,"cid":"22GP0050","pid":"P00620277VS","t":"Construction of River Control along Panay River Basin, Poblacion Sur-Dayhagon, Sigma, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"SIGMA (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":62965479.53,"abc":62965489.07,"fy":"2022","sd":"03/01/2022","cd":"2024-02-20","lat":11.41406,"lon":122.66972,"sm":1452,"fm":1452,"tm":1452,"am":1452,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":2.68,"wp":[11.40088,122.69036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6563],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 118,906,723.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":852},{"i":6573,"cid":"21F00070","pid":"P00525660LZ","t":"Construction of Daet River Control Structure ( Camambugan Section), Brgy. Camambugan, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"Daet","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION / 128 DRAGON CONSTRUCTION AND SUPPLIES","c":65583420.66,"abc":65583420.66,"fy":"2021","sd":"05/20/2022","cd":"2022-12-15","lat":14.10855,"lon":122.941958,"sm":471,"fm":null,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.03,"wp":[14.10862,122.94167],"wst":"matched","br":"Camambugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5073},{"i":6574,"cid":"23GK0005","pid":"P00721739VS","t":"Construction of Flood Control Structure along Malogo River, Abut. ''A'', EB. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":86847998.0,"abc":86849975.57,"fy":"2023","sd":"02/14/2023","cd":"2023-12-15","lat":10.87919,"lon":123.04301,"sm":548,"fm":548,"tm":null,"am":548,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.04,"wp":[10.87959,123.04302],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6590],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 183,347,991.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1059},{"i":6575,"cid":"23FD0008","pid":"P00726606LZ","t":"Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38+060.00 - Sta. 38+335.00, Sipocot, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"DMLC BUILDERS","c":57899831.5,"abc":57899833.65,"fy":"2023","sd":"05/18/2023","cd":"2023-11-08","lat":13.770647,"lon":122.974896,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Sipocot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"North Centro","len":275.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5074},{"i":6576,"cid":"21DM0051","pid":"P00526112LZ","t":"Construction of Inatoy Creek Waterway, Bry. Madulao, Catanauan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"Catanauan","deo":"Quezon 3rd District Engineering Office","co":"R.T.Y.  CONSTRUCTION","c":39200000.0,"abc":39199894.28,"fy":"2021","sd":"02/12/2021","cd":"2022-07-05","lat":13.587248,"lon":122.332695,"sm":351,"fm":null,"tm":351,"am":351,"md":0.0,"ls":"inside","ww":"Inatoy","wn":"Inatoy Creek","wd":0.14,"wp":[13.5866,122.33163],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5075},{"i":6577,"cid":"22G00144","pid":"P00620444VS","t":"Construction of Drainage System, Mandurriao District, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":113778192.7,"abc":115800000.0,"fy":"2022","sd":"03/29/2022","cd":"2024-03-20","lat":10.724131,"lon":122.529849,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5076},{"i":6578,"cid":"24HO0096","pid":"P00834664VS","t":"Construction of Revetment Wall at Barangay Madridejos, Alegria, Cebu (Upstream Right Side)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FS CO BUILDERS AND SUPPLY","c":48995002.78,"abc":48995366.78,"fy":"2024","sd":"03/18/2024","cd":"2024-06-20","lat":9.786702,"lon":123.347137,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madridejos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5077},{"i":6579,"cid":"23FN0033","pid":"P00736114LZ","t":"Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica-Salvacion Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":77086212.17,"abc":77086212.17,"fy":"2023","sd":"02/16/2023","cd":"2023-09-25","lat":13.483323,"lon":123.281948,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.02,"wp":[13.4833,123.28178],"wst":"matched","br":"Fabrica-Salvacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5078},{"i":6580,"cid":"23GO0013","pid":"P00721486VS","t":"Construction of Lupit River Flood Control Structure, Phase 7, Bacolod City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / M.K.U. CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-02-15","lat":10.653517,"lon":122.942575,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Lupit","wn":"Lupit River","wd":0.01,"wp":[10.6535,122.94251],"wst":"matched","br":null,"len":null,"ph":"Phase 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5079},{"i":6581,"cid":"23FD0017","pid":"P00740491LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. South Centro Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":82023729.03,"abc":82024639.56,"fy":"2023","sd":"04/19/2023","cd":"2023-12-05","lat":13.754763,"lon":122.975198,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.75429,122.97508],"wst":"matched","br":"South Centro Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5080},{"i":6582,"cid":"22FN0014","pid":"P00620730LZ","t":"Construction of River Slope Protection of Barit River and Waras River Outfall, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":37237616.17,"abc":39200000.0,"fy":"2022","sd":"02/22/2022","cd":"2023-08-10","lat":13.427752,"lon":123.350085,"sm":1000,"fm":1000,"tm":1000,"am":86,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":3.71,"wp":[13.4008,123.37052],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.71,"text":"The title names Barit, which OpenStreetMap maps through the stated municipality, but the pin is 3.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":395},{"i":6583,"cid":"23GF0128","pid":"P00721930VS","t":"Construction/Improvement of Guimbal Shoreline/Seawall Protection, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GALENO CONSTRUCTION, INC.","c":19395767.87,"abc":19600000.0,"fy":"2023","sd":"09/14/2023","cd":"2024-03-04","lat":10.667852,"lon":122.333419,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5081},{"i":6584,"cid":"22DL0042","pid":"P00620620LZ","t":"Rehabilitation/Reconstruction of Drainage Structure along Brgy. Poblacion, Tagkawayan, Quezon","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region IV-A","pv":"QUEZON","mu":"TAGKAWAYAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"RUSLIN CONSTRUCTION","c":25284000.0,"abc":25284000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-11-15","lat":13.967388,"lon":122.532655,"sm":1515,"fm":1515,"tm":1515,"am":1515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5082},{"i":6585,"cid":"23FN0023","pid":"P00736112LZ","t":"Construction of Bank Protection Structure along Pawili River, Brgy. Sto. Domingo-Fabrica Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":72347907.66,"abc":72347907.66,"fy":"2023","sd":"02/17/2023","cd":"2023-09-15","lat":13.487057,"lon":123.282092,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.48732,123.28211],"wst":"matched","br":"Sto. Domingo-Fabrica Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5083},{"i":6586,"cid":"25HL0025","pid":"P00920324VS","t":"Construction of Flood Control Structure, Amio River (Downstream), Package 1, Santa Catalina, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SANTA CATALINA (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":48852510.0,"abc":49000000.0,"fy":"2025","sd":"02/19/2025","cd":"2025-04-22","lat":9.421111,"lon":122.942778,"sm":1373,"fm":1373,"tm":1373,"am":1373,"md":0.0,"ls":"inside","ww":"Amio","wn":"Amio River","wd":1.32,"wp":[9.41381,122.93329],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5084},{"i":6587,"cid":"23GP0059","pid":"P00721993VS","t":"Construction of River Control along Panay River Basin, Barangay Bito-on Ilawod, Cuartero, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"CUARTERO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":72374727.18,"abc":72374750.12,"fy":"2023","sd":"04/17/2023","cd":"2024-06-15","lat":11.30723,"lon":122.66977,"sm":462,"fm":462,"tm":462,"am":462,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.66,"wp":[11.31018,122.66456],"wst":"matched","br":"Bito-on Ilawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5085},{"i":6588,"cid":"24GL0042","pid":"P00820004VS","t":"Construction of Binalbagan River Bank Slope Protection at Had. Millan, Brgy. Rumirang, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":95052445.9,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-08-05","lat":10.231726,"lon":122.975205,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.23197,122.97525],"wst":"matched","br":"Rumirang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5086},{"i":6589,"cid":"22GF0047","pid":"P00620427VS","t":"Construction of Guimbal Shoreline Protection, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":9703498.97,"abc":9800000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-01-03","lat":10.667867,"lon":122.333552,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5087},{"i":6590,"cid":"24GK0013","pid":"P00820285VS","t":"Construction of Flood Control Structure of Malogo River, Abutment ''A'' EB. Magalona, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ENRIQUE B. MAGALONA (SARAVIA) (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":96499993.42,"abc":96499993.25,"fy":"2024","sd":"02/19/2024","cd":"2024-12-10","lat":10.87919,"lon":123.04301,"sm":548,"fm":548,"tm":null,"am":548,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.04,"wp":[10.87959,123.04302],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6574],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 183,347,991.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1031},{"i":6591,"cid":"22G00113","pid":"P00630203VS","t":"Rehabilitation of Iloilo Flood Control Project, Section 1, Pavia, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"PAVIA (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":33774530.07,"abc":33775000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-01-07","lat":10.774406,"lon":122.53313,"sm":1116,"fm":1116,"tm":1116,"am":1116,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5088},{"i":6592,"cid":"22GL0092","pid":"P00620438VS","t":"Construction of Guintubhan River Bank Slope (Downstream of Guintubhan Br.) along Binalbagan - Isabela Road (Left Bank, Phase II), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-01-17","lat":10.2063,"lon":122.94297,"sm":651,"fm":651,"tm":null,"am":651,"md":0.0,"ls":"inside","ww":"Guintubhan","wn":"Guintobhan River","wd":0.02,"wp":[10.20614,122.94305],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5089},{"i":6593,"cid":"23GA0103","pid":"P00721985VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Palale, Banga, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":29399938.85,"abc":29400000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-08-16","lat":11.65325,"lon":122.333604,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.06,"wp":[11.65346,122.33309],"wst":"matched","br":"Palale","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5090},{"i":6594,"cid":"24GK0071","pid":"P00832634VS","t":"Construction of Drainage System, Barangay Fabrica, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":4947617.3,"abc":4949987.49,"fy":"2024","sd":"03/13/2024","cd":"2024-06-04","lat":10.88888,"lon":123.352777,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Fabrica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5091},{"i":6595,"cid":"22GP0022","pid":"P00620274VS","t":"Construction of River Control along Panay River Basin, Brgy. Pagbunitan, Sigma, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"SIGMA (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":55969699.01,"abc":55969778.33,"fy":"2022","sd":"03/01/2022","cd":"2023-11-13","lat":11.41433,"lon":122.67029,"sm":1452,"fm":1452,"tm":1452,"am":1452,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":2.65,"wp":[11.40088,122.69036],"wst":"matched","br":"Pagbunitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5092},{"i":6596,"cid":"23GO0053","pid":"P00732016VS","t":"Construction of Drainage System, Bacolod City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"KENBE CONSTRUCTION & SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-04-25","lat":10.591439,"lon":122.97633,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5093},{"i":6597,"cid":"23F00043","pid":"P00726629LZ","t":"Construction of Pawili River Flood Mitigation Structure (Barangay Salvacion and Barangay Bagumbayan) Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":120971555.2,"abc":120971555.2,"fy":"2023","sd":"04/20/2023","cd":"2024-04-15","lat":13.471407,"lon":123.28236,"sm":247,"fm":247,"tm":null,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.47123,123.28254],"wst":"matched","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5094},{"i":6598,"cid":"22GK0010","pid":"P00620253VS","t":"Construction of Flood Control Structure of Imbang River (Both Stream) along Bacolod North Rd, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / CBCL CONSTRUCTION & SUPPLY","c":90707998.0,"abc":90709991.89,"fy":"2022","sd":"02/22/2022","cd":"2023-01-21","lat":10.832435,"lon":122.976354,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":10.0,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.68,"value":10.0,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 10.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":232},{"i":6599,"cid":"24HL0010","pid":"P00820208VS","t":"Construction of Canaway River Control (Downstream A), Siaton, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIATON (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-11","lat":9.056496,"lon":123.043107,"sm":1439,"fm":1439,"tm":1439,"am":1439,"md":0.0,"ls":"inside","ww":"Canaway","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5095},{"i":6600,"cid":"24GG0054","pid":"P00820388VS","t":"Construction of Flood Control along Jalaur River in Calinog, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)","c":34299949.95,"abc":34300000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-06-15","lat":11.119142,"lon":122.533492,"sm":306,"fm":306,"tm":635,"am":306,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.01,"wp":[11.11927,122.5335],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":37.32,"text":"The record contradicts itself: the municipality field and the pin point to Calinog, Iloilo, but the title names Iloilo City, Iloilo, 37 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":569},{"i":6601,"cid":"24FD0039","pid":"P00844576LZ","t":"Construction of Flood Mitigation Structure, Barangay Sooc, Lupi, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LUPI (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":94305463.04,"abc":96499502.24,"fy":"2024","sd":"03/27/2024","cd":"2024-06-21","lat":13.873732,"lon":122.942989,"sm":832,"fm":832,"tm":832,"am":832,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sooc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5096},{"i":6602,"cid":"22GA0026","pid":"P00620073VS","t":"Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"LEZO (AKLAN)","deo":"Aklan District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":48999997.14,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-10-19","lat":11.671332,"lon":122.333677,"sm":773,"fm":773,"tm":773,"am":773,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.15,"wp":[11.67065,122.33482],"wst":"matched","br":"Mina","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5097},{"i":6603,"cid":"22E00151","pid":"P00639384LZ","t":"Construction of River Control Structure and Drainage System, Cambajao River Control, Sibuyan Island, Romblon (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"ROMBLON","mu":"CAJIDIOCAN (ROMBLON)","deo":"Romblon District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":106137741.4,"abc":106149999.9,"fy":"2022","sd":"03/24/2022","cd":"2023-08-31","lat":12.36518,"lon":122.67363,"sm":290,"fm":290,"tm":1213,"am":290,"md":0.0,"ls":"inside","ww":"Cambajao","wn":"Cambajao River","wd":0.02,"wp":[12.36534,122.67365],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":40.68,"text":"The record contradicts itself: the municipality field and the pin point to Cajidiocan, Romblon, but the title names Romblon, Romblon, 41 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":441},{"i":6604,"cid":"23FN0056","pid":"P00736118LZ","t":"Construction of Bank Protection Structure along Pawili River, Salvacion Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/20/2023","cd":"2024-04-09","lat":13.474047,"lon":123.282705,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.47404,123.28298],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5098},{"i":6605,"cid":"22FC0214","pid":"P00640472LZ","t":"Construction of Flood Mitigation and Structure, Barangay San Jose, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":49499918.87,"abc":49499918.87,"fy":"2022","sd":"03/31/2022","cd":"2022-12-09","lat":14.147875,"lon":122.976767,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5099},{"i":6606,"cid":"23HO0039","pid":"P00721526VS","t":"Construction of Flood Wall Structures along Sitio Parale - Sitio Sulok (Left Side), barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS / FIRST GRANDEUR BUILDERS","c":57896886.0,"abc":57898243.83,"fy":"2023","sd":"02/08/2023","cd":"2023-08-16","lat":9.645494,"lon":123.352827,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[],"run":[7606,6671],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23HO0038 to 23HO0040) cover the same site, together worth PHP 202,426,489.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":448},{"i":6607,"cid":"22FE0028","pid":"P00620712LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. San Cirilo, Pasacao, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"PASACAO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":48017313.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-15","lat":13.508967,"lon":123.044403,"sm":1106,"fm":1106,"tm":1106,"am":1106,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Cirilo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5100},{"i":6608,"cid":"23F00282","pid":"P00742192LZ","t":"Construction of Flood Mitigation Structure, Bagasbas River Control Structure, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":19799998.09,"abc":19799998.09,"fy":"2023","sd":"09/05/2023","cd":"2024-02-11","lat":14.1452,"lon":122.9768,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Bagasbas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5101},{"i":6609,"cid":"23GG0013","pid":"P00721811VS","t":"Construction of Flood Control along Jalaur River, Calinog, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"EARLY RISER CONSTRUCTION","c":24499440.86,"abc":24500000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-05-22","lat":11.119219,"lon":122.533565,"sm":306,"fm":306,"tm":306,"am":306,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.0,"wp":[11.11926,122.53357],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5102},{"i":6610,"cid":"22FC0104","pid":"P00631386LZ","t":"Construction of Daet River Control (Lag-on Section) Barangay Lag-on, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":29399162.64,"abc":29399162.64,"fy":"2022","sd":"03/15/2022","cd":"2022-11-01","lat":14.115028,"lon":122.943497,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.05,"wp":[14.11491,122.94391],"wst":"matched","br":"Lag-on","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5103},{"i":6611,"cid":"21DM0066","pid":"P00561185LZ","t":"Construction of Drainage of Brgy. Poblacion, San Andres, Quezon","w":"Construction of Drainage Structure","rg":"Region IV-A","pv":"QUEZON","mu":"San Andres","deo":"Quezon 3rd District Engineering Office","co":"ADAD ENGINEERING SERVICES & SUPPLY","c":9800000.0,"abc":9899982.47,"fy":"2021","sd":"03/31/2022","cd":"2022-10-26","lat":13.328133,"lon":122.675526,"sm":1253,"fm":null,"tm":1253,"am":1253,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5104},{"i":6612,"cid":"23HO0229","pid":"P00745600VS","t":"Repair/ Rehabilitation/ Reconstruction of Parale River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+000 to Sta. 0+131","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":94220452.01,"abc":94220799.91,"fy":"2023","sd":"09/04/2023","cd":"2024-07-03","lat":9.648231,"lon":123.352979,"sm":887,"fm":887,"tm":362,"am":887,"md":0.0,"ls":"inside","ww":"Parale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":131.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":87.24,"text":"The record contradicts itself: the municipality field and the pin point to Malabuyoc, Cebu, but the title names Cebu City, Cebu, 87 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.52,"value":719240,"text":"About PHP 719,240 per metre over 131 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":149},{"i":6613,"cid":"23GA0110","pid":"P00721992VS","t":"Rehabilitation of Flood Control / Revetment Wall along Aklan River, Barangay Jumarap, Banga, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"EC BUILDERS","c":19583672.06,"abc":19600000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-08-29","lat":11.653324,"lon":122.333686,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.07,"wp":[11.65355,122.33312],"wst":"matched","br":"Jumarap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5105},{"i":6614,"cid":"23GK0006","pid":"P00721740VS","t":"Construction of Flood Control Structure along Malogo River, Abut. ''B'', Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":86847719.0,"abc":86849992.44,"fy":"2023","sd":"02/14/2023","cd":"2023-12-18","lat":10.8758,"lon":123.04567,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.06,"wp":[10.87584,123.04516],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6631],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 183,347,716.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1060},{"i":6615,"cid":"24FD0041","pid":"P00845848LZ","t":"Construction of Riverbank Protection Structure along Bigaan River, Malubago Section, Sipocot, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"JUSTBILT BUILDERS","c":98999371.67,"abc":98999528.72,"fy":"2024","sd":"05/07/2024","cd":"2024-12-16","lat":13.769927,"lon":122.97863,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Bigaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5106},{"i":6616,"cid":"24JC0007","pid":"P00833583MN","t":"Construction of Flood Control Structure, Katipunan, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"KATIPUNAN (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"RDT CONSTRUCTION AND GENERAL MERCHANDISE","c":9854928.39,"abc":9900000.0,"fy":"2024","sd":"02/21/2024","cd":"2025-01-26","lat":8.513611,"lon":123.284167,"sm":702,"fm":702,"tm":702,"am":702,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5107},{"i":6617,"cid":"22GP0062","pid":"P00620300VS","t":"Construction of River Control along Panay River Basin, Brgy. Tinaytayan (Tinaytayan Elem. School), Dumarao, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMARAO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":43225821.07,"abc":42225822.3,"fy":"2022","sd":"02/21/2022","cd":"2024-02-08","lat":11.3001,"lon":122.67597,"sm":541,"fm":541,"tm":541,"am":541,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":1.66,"wp":[11.30972,122.66424],"wst":"matched","br":"Tinaytayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.47,"value":1.02368,"text":"Contract cost is 2.37% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":693},{"i":6618,"cid":"22DL0036","pid":"P00620606LZ","t":"Construction of Breakwater, Tagkawayan, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"TAGKAWAYAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"BOMEL CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-09-12","lat":13.964639,"lon":122.535769,"sm":1515,"fm":1515,"tm":1515,"am":1515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5108},{"i":6619,"cid":"22FC0047","pid":"P00620699LZ","t":"Construction of Talisay River Flood Control Structure, Brgy. Binanuan, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE / N.E.B. CONSTRUCTION AND SUPPLY","c":41159560.59,"abc":41159560.59,"fy":"2022","sd":"03/18/2022","cd":"2022-09-05","lat":14.143472,"lon":122.943525,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":"Talisay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Binanuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5109},{"i":6620,"cid":"24GA0133","pid":"P00821160VS","t":"Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BANGA (AKLAN)","deo":"Aklan District Engineering Office","co":"PASTRANA CONSTRUCTION & SUPPLIES (FORMERLY: PASTRA","c":28949793.71,"abc":28950000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-06-18","lat":11.653337,"lon":122.333981,"sm":147,"fm":147,"tm":147,"am":147,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.1,"wp":[11.65366,122.33317],"wst":"matched","br":"Palale","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5110},{"i":6621,"cid":"22FC0045","pid":"P00631410LZ","t":"Construction of River Control Structure, Barangay Basiad, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":19525424.72,"abc":19599294.8,"fy":"2022","sd":"03/17/2022","cd":"2022-08-22","lat":14.156883,"lon":122.337078,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basiad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5111},{"i":6622,"cid":"22GK0005","pid":"P00620302VS","t":"Construction of Flood Control Structure of Himoga-an River along Bacolod North Road, Phase 2, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48997964.88,"abc":48999964.03,"fy":"2022","sd":"02/08/2022","cd":"2023-05-11","lat":10.893333,"lon":123.353056,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":"Himoga-an","wn":"Himogaan River","wd":0.01,"wp":[10.8933,123.35311],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5112},{"i":6623,"cid":"23FF0052","pid":"P00742477LZ","t":"Construction of Flood Mitigation Structure, Brgy. Sibobo (Zone 5), Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4749500.0,"abc":4949993.14,"fy":"2023","sd":"06/13/2023","cd":"2023-08-26","lat":13.75876,"lon":123.2857,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sibobo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5113},{"i":6624,"cid":"22FD0010","pid":"P00632961LZ","t":"Construction of Revetment, Sta. 3+596 to Sta. 3+713, Barangay Malubago, Sipocot, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":29699691.66,"abc":29699693.1,"fy":"2022","sd":"03/24/2022","cd":"2022-11-10","lat":13.77042,"lon":122.9789,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malubago","len":117.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5114},{"i":6625,"cid":"24FD0035","pid":"P00844587LZ","t":"Construction of Shore Protection Structure, Barangay Lower Omon, Ragay, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"RAGAY (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"RAPIDWORKZ CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":96495012.79,"abc":96499961.53,"fy":"2024","sd":"03/25/2024","cd":"2024-06-04","lat":13.8212,"lon":122.6786,"sm":1196,"fm":1196,"tm":1196,"am":1196,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lower Omon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5115},{"i":6626,"cid":"23GO0027","pid":"P00721632VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Hernaez St, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":34300000.0,"abc":34300000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-11-03","lat":10.663611,"lon":122.944167,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5116},{"i":6627,"cid":"23HO0001","pid":"P00721523VS","t":"Construction of Flood Control Structure at Sitio Parale, Brgy. Sorsogon, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96015132.75,"abc":96015727.77,"fy":"2023","sd":"02/08/2023","cd":"2023-09-26","lat":9.644314,"lon":123.353112,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[],"run":[6656,6662,7599],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HO0001 to 23HO0005) cover the same site, together worth PHP 298,631,246.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":296},{"i":6628,"cid":"21G00149","pid":"P00521547VS","t":"Rehabilitation/Improvement of Iloillo Flood Control Project (IFCP), Iloilo City and Pavia, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":19300000.0,"abc":19300000.0,"fy":"2021","sd":"06/23/2022","cd":"2023-09-16","lat":10.769897,"lon":122.536993,"sm":635,"fm":null,"tm":635,"am":1116,"md":1.21,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5117},{"i":6629,"cid":"23HK0053","pid":"P00721846VS","t":"Construction of Banica River Control, Junob, Dumaguete City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"DUMAGUETE CITY (CAPITAL) (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-11-20","lat":9.30928,"lon":123.28594,"sm":534,"fm":534,"tm":534,"am":534,"md":0.0,"ls":"inside","ww":"Banica","wn":"Banica River","wd":0.01,"wp":[9.30932,123.28592],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5118},{"i":6630,"cid":"23FC0043","pid":"P00726288LZ","t":"Construction/Rehabilitation of Flood Protection Measures at Brgy. Basiad, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":17639257.98,"abc":17639257.98,"fy":"2023","sd":"04/05/2023","cd":"2023-08-26","lat":14.156823,"lon":122.3371,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basiad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5119},{"i":6631,"cid":"24GK0014","pid":"P00820286VS","t":"Construction of Flood Control Structure of Malogo River, Abutment \"B\" Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES)","c":96499996.75,"abc":96499995.9,"fy":"2024","sd":"03/13/2024","cd":"2024-12-10","lat":10.8758,"lon":123.04567,"sm":437,"fm":437,"tm":null,"am":437,"md":0.0,"ls":"inside","ww":"Malogo","wn":"Malogo River","wd":0.06,"wp":[10.87584,123.04516],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6614],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 183,347,716.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1032},{"i":6632,"cid":"22FD0011","pid":"P00632962LZ","t":"Construction of Revetment, Sta. 3+713 to Sta. 3+800, Barangay Malubago, Sipocot, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":29699598.42,"abc":29699598.45,"fy":"2022","sd":"03/24/2022","cd":"2022-11-10","lat":13.77115,"lon":122.97956,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malubago","len":87.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5120},{"i":6633,"cid":"23GO0031","pid":"P00721640VS","t":"Construction of Drainage System, Roxas Avenue, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"ANCHORVILLE REALTY DEV'T CONSTRUCTION CORP.","c":11760000.0,"abc":11760000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-09-26","lat":10.657778,"lon":122.945273,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5121},{"i":6634,"cid":"22GG0093","pid":"P00620260VS","t":"Construction of Flood Control Structure along Jalaur River, Pototan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"POTOTAN (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":43217768.99,"abc":44100000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-10-29","lat":10.91312,"lon":122.68548,"sm":1167,"fm":1167,"tm":1167,"am":1167,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.06,"wp":[10.91292,122.68596],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5122},{"i":6635,"cid":"23HO0094","pid":"P00721908VS","t":"Construction of Bank Protection Structures along Brgy. Mindanao - Brgy. Sorsogon, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":72373204.29,"abc":72373235.28,"fy":"2023","sd":"03/16/2023","cd":"2023-11-24","lat":9.644153,"lon":123.353152,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5123},{"i":6636,"cid":"23GJ0030","pid":"P00733726VS","t":"Construction of Drainage System in Mandurriao, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"OTING CONSTRUCTION AND SUPPLY","c":4900642.53,"abc":4950000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-11-08","lat":10.719488,"lon":122.537441,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5124},{"i":6637,"cid":"22F00101","pid":"P00620294LZ","t":"Construction of Pawili River Flood Mitigation Structure, Brgy. Causip and Brgy. Fabrica, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":97281469.34,"abc":97281469.34,"fy":"2022","sd":"03/21/2022","cd":"2023-03-31","lat":13.489224,"lon":123.286382,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.03,"wp":[13.48935,123.28661],"wst":"matched","br":"Causip","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5125},{"i":6638,"cid":"23F00129","pid":"P00740452LZ","t":"Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":96499613.82,"abc":96499613.82,"fy":"2023","sd":"08/09/2023","cd":"2024-02-15","lat":14.143265,"lon":122.945288,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":"Talisay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5126},{"i":6639,"cid":"24FD0006","pid":"P00820481LZ","t":"Construction of Flood Mitigation Structure, Barangay Cotmo, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":113974811.1,"abc":113974814.6,"fy":"2024","sd":"03/01/2024","cd":"2024-06-24","lat":13.8097,"lon":123.0474,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cotmo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5127},{"i":6640,"cid":"23FD0029","pid":"P00736078LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Taisan Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY / SHLA CONSTRUCTION AND SUPPLY","c":72374568.0,"abc":72374683.76,"fy":"2023","sd":"03/31/2023","cd":"2023-08-23","lat":13.781635,"lon":122.945533,"sm":1464,"fm":1464,"tm":1464,"am":1464,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.04,"wp":[13.78196,122.9455],"wst":"matched","br":"Taisan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5128},{"i":6641,"cid":"23GA0115","pid":"P00721925VS","t":"Construction of Revetment Wall along NHA Project Site, Brgy. Albasan, Numancia, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"NUMANCIA (AKLAN)","deo":"Aklan District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":48999994.12,"abc":49000000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-06-18","lat":11.721599,"lon":122.337483,"sm":1029,"fm":1029,"tm":1029,"am":1029,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Albasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5129},{"i":6642,"cid":"22HO0048","pid":"P00620446VS","t":"Improvement of Riverbank along Parale River, Sta. 0 + 000 - Sta. 0 + 700, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96499958.77,"abc":96499958.77,"fy":"2022","sd":"03/24/2022","cd":"2023-01-24","lat":9.648926,"lon":123.353472,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":"Parale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5130},{"i":6643,"cid":"22GK0091","pid":"P00630641VS","t":"Construction of Seawall/Breakwater, Barangay Chambery, Manapla, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"MANAPLA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"GALFONS BUILDERS & SUPPLY, INC.","c":8826240.0,"abc":9899996.24,"fy":"2022","sd":"02/08/2022","cd":"2022-08-04","lat":11.07569,"lon":122.97985,"sm":912,"fm":912,"tm":912,"am":14,"md":19.52,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Chambery","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":19.52,"text":"The pin is 19.5 km outside Manapla, Negros Occidental, the nearest municipality the record claims. It falls in Ajuy, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":289},{"i":6644,"cid":"24JD0015","pid":"P00820134MN","t":"Rehabilitation of Flood Control Structure along Talinga River (Upstream), Talinga, Leon B. Postigo, Zamboanga del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LEON T. POSTIGO (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"ST. JOSEPH CONSTRUCTION & TRADING","c":14700000.0,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-22","lat":8.0695,"lon":122.54028,"sm":null,"fm":null,"tm":null,"am":728,"md":null,"ls":"unknown","ww":"Talinga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":146},{"i":6645,"cid":"22GO0028","pid":"P00620080VS","t":"Construction of Revetment with Floodwall in Magsungay River, Phase 6, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":44113720.0,"abc":44113720.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-18","lat":10.644565,"lon":122.945705,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Magsungay","wn":"Magsungay River","wd":0.02,"wp":[10.64449,122.94587],"wst":"matched","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5131},{"i":6646,"cid":"22FN0022","pid":"P00630970LZ","t":"Construction of Flood Control Structure, Downstream of San Francisco Br., Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RICHMAR CONSTRUCTION","c":65185821.9,"abc":67550000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-12-09","lat":13.456345,"lon":123.3535,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5132},{"i":6647,"cid":"24GG0115","pid":"P00820389VS","t":"Construction of Flood Control Structure along Jalaur River in Barotac Nuevo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC NUEVO (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":38999560.22,"abc":39200000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-07-08","lat":10.909303,"lon":122.686297,"sm":168,"fm":168,"tm":635,"am":168,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.05,"wp":[10.90924,122.68587],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":18.58,"text":"The record contradicts itself: the municipality field and the pin point to Barotac Nuevo, Iloilo, but the title names Iloilo City, Iloilo, 19 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":570},{"i":6648,"cid":"23GA0142","pid":"P00733711VS","t":"Construction of Revetment Wall along Navitas Estuary, Brgy. Navitas, Numancia, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"NUMANCIA (AKLAN)","deo":"Aklan District Engineering Office","co":"VILLORENTE TWIN BUILDERS CORPORATION","c":9891863.68,"abc":9900000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-10-20","lat":11.736091,"lon":122.339152,"sm":1029,"fm":1029,"tm":1029,"am":1029,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Navitas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5133},{"i":6649,"cid":"22GH0053","pid":"P00620095VS","t":"Construction of Seawall, Brgy. Culasi, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-06-25","lat":11.073633,"lon":122.980833,"sm":14,"fm":14,"tm":14,"am":14,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culasi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5134},{"i":6650,"cid":"23GJ0031","pid":"P00733727VS","t":"Construction of Drainage System in Molo, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":4939923.08,"abc":4950000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-10-10","lat":10.697521,"lon":122.541401,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5135},{"i":6651,"cid":"21JB0079","pid":"P00522035MN","t":"Construction of Flood Control Structure along Disakan River (Upstream and Downstream), Manukan and Jose Dalman, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":null,"deo":"Zamboanga del Norte 2nd District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":67418646.51,"abc":67550000.0,"fy":"2021","sd":"03/22/2021","cd":"2022-11-24","lat":8.484722,"lon":123.049722,"sm":null,"fm":null,"tm":null,"am":925,"md":null,"ls":"unknown","ww":"Disakan","wn":"Disakan River","wd":0.02,"wp":[8.4848,123.04955],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":147},{"i":6652,"cid":"24FN0003","pid":"P00821392LZ","t":"Construction of Flood Mitigation Structure along Bicol River, Barangay Balaogan Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-11-19","lat":13.44402,"lon":123.28702,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.44424,123.28707],"wst":"matched","br":"Balaogan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5136},{"i":6653,"cid":"23GF0093","pid":"P00733717VS","t":"Construction of Guimbal Shoreline Protection, East Coast Section, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"DEACONS TEMPLE CONSTRUCTION & SUPPLY","c":19563085.49,"abc":19600000.0,"fy":"2023","sd":"04/18/2023","cd":"2024-01-05","lat":10.67114,"lon":122.344341,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5137},{"i":6654,"cid":"23GP0017","pid":"P00721723VS","t":"Construction of River Control along Panay River Basin, Barangay Poblacion Ilaya to Barangay Poblacion Ilawod, Dao, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DAO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":71409709.04,"abc":71409713.25,"fy":"2023","sd":"03/13/2023","cd":"2024-06-29","lat":11.39133,"lon":122.68649,"sm":482,"fm":482,"tm":482,"am":482,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.03,"wp":[11.39123,122.68676],"wst":"matched","br":"Poblacion Ilaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5138},{"i":6655,"cid":"23GF0007","pid":"P00721647VS","t":"Construction of Nanga Shoreline Protection, Guimbal, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"GUIMBAL (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":14551344.14,"abc":14700000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-08","lat":10.671108,"lon":122.34518,"sm":599,"fm":599,"tm":599,"am":599,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5139},{"i":6656,"cid":"23HO0002","pid":"P00721525VS","t":"Construction of Flood Wall Structures along Sitio Parale (Left Side), barangay Sorsogon, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":57898184.98,"abc":57898231.91,"fy":"2023","sd":"02/08/2023","cd":"2023-07-21","lat":9.642561,"lon":123.355265,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[6662],"run":[6627,6662,7599],"cl":[],"L":"field","s":51,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,893,521.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HO0001 to 23HO0005) cover the same site, together worth PHP 298,631,246.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":101},{"i":6657,"cid":"22FC0055","pid":"P00620697LZ","t":"Construction of Daet River Control Structure (San Isidro Section), Brgy. San Isidro, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JCO CONSTRUCTION AND SUPPLY","c":23745445.6,"abc":24499945.05,"fy":"2022","sd":"03/24/2022","cd":"2022-09-05","lat":14.106558,"lon":122.981236,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.04,"wp":[14.10685,122.98136],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5140},{"i":6658,"cid":"23G00026","pid":"P00721496VS","t":"Rehabilitation of Iloilo Flood Control Project, Pavia, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"PAVIA (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"RMKP CONSTRUCTION INC. (FORMERLY: RMKP CONSTRUCTION)","c":27985000.0,"abc":27985000.0,"fy":"2023","sd":"02/16/2023","cd":"2024-01-27","lat":10.768667,"lon":122.541715,"sm":1116,"fm":1116,"tm":1116,"am":1116,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5141},{"i":6659,"cid":"24HK0050","pid":"P00820402VS","t":"Construction of Flood Control Dike, Barangay Panalaan, Bais City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BAIS CITY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":9800000.0,"abc":9800000.0,"fy":"2024","sd":"04/04/2024","cd":"2024-07-21","lat":9.596037,"lon":123.050386,"sm":113,"fm":113,"tm":113,"am":113,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panalaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5142},{"i":6660,"cid":"23GO0014","pid":"P00721487VS","t":"Construction of Revetment with Floodwall including Improvement of Riverbank along Magsungay River, Bacolod City, Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/22/2023","cd":"2024-01-22","lat":10.644711,"lon":122.945725,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Magsungay","wn":"Magsungay River","wd":0.03,"wp":[10.64449,122.94587],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5143},{"i":6661,"cid":"23F00042","pid":"P00726628LZ","t":"Construction of Pawili River Flood Mitigation Structure (Barangay Causip and Barangay Fabrica), Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":115659116.9,"abc":115659116.9,"fy":"2023","sd":"04/03/2023","cd":"2024-03-31","lat":13.486346,"lon":123.287195,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Pawili","wn":"Pawili River","wd":0.02,"wp":[13.4865,123.28712],"wst":"matched","br":"Causip","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5144},{"i":6662,"cid":"23HO0003","pid":"P00721683VS","t":"Construction of Flood Wall Structures along Sitio Parale (Right Side), barangay Sorsogon, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FIRST GRANDEUR BUILDERS","c":48995336.08,"abc":48998254.45,"fy":"2023","sd":"02/08/2023","cd":"2023-08-23","lat":9.642561,"lon":123.355265,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[6656],"run":[6627,6656,7599],"cl":[],"L":"field","s":49,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 106,893,521.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HO0001 to 23HO0005) cover the same site, together worth PHP 298,631,246.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":109},{"i":6663,"cid":"22G00120","pid":"P00634051VS","t":"Construction of Flood Control Structure along Imbang River (Upstream), Sta. 2 + 209.3 - Sta. 2 + 598.5, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":43423000.33,"abc":43425000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-06-01","lat":10.819219,"lon":122.982169,"sm":1456,"fm":1456,"tm":null,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":8.49,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":389.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.49,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 8.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":326},{"i":6664,"cid":"23FC0033","pid":"P00737557LZ","t":"Construction of Flood Mitigation Structure, Barangay Pulongguit-guit, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"GREAT WALL ENGINEERING","c":8169001.17,"abc":9899717.98,"fy":"2023","sd":"04/05/2023","cd":"2023-07-31","lat":14.210847,"lon":122.345989,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulongguit-guit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5145},{"i":6665,"cid":"22G00118","pid":"P00634049VS","t":"Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 456 - Sta. 1 + 830.4, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":43423000.0,"abc":43425000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-03-04","lat":10.821292,"lon":122.983856,"sm":1456,"fm":1456,"tm":null,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":8.53,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":374.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.53,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 8.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":327},{"i":6666,"cid":"22GL0093","pid":"P00620437VS","t":"Construction of Guintubhan River Bank Slope (Upstream of Guintubhan Br.) along Binalbagan - Isabela Road (Right Bank, Phase II), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BINALBAGAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96498863.82,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-01-19","lat":10.20743,"lon":122.9458,"sm":204,"fm":204,"tm":null,"am":651,"md":0.02,"ls":"boundary","ww":"Guintubhan","wn":"Guintobhan River","wd":0.02,"wp":[10.2073,122.94587],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5146},{"i":6667,"cid":"23GJ0034","pid":"P00733731VS","t":"Construction of Drainage System San Juan, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"NOE'S BUILDERS","c":4940475.35,"abc":4950000.0,"fy":"2023","sd":"07/12/2023","cd":"2023-10-16","lat":10.6891,"lon":122.541898,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5147},{"i":6668,"cid":"23HK0063","pid":"P00731632VS","t":"Construction of Tamogong River Control, Bais City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BAIS CITY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/10/2023","cd":"2024-02-12","lat":9.5942,"lon":123.0506,"sm":113,"fm":113,"tm":113,"am":113,"md":0.0,"ls":"inside","ww":"Tamogong","wn":"Tamogong River","wd":0.24,"wp":[9.59641,123.05052],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5148},{"i":6669,"cid":"22GP0053","pid":"P00620275VS","t":"Construction of River Control along Panay River Basin, Brgy. Poblacion Ilawod (Downstream of Janguslob Overflow), Dumarao, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DUMARAO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":50372582.3,"abc":50372664.0,"fy":"2022","sd":"02/28/2022","cd":"2023-12-04","lat":11.26786,"lon":122.68887,"sm":541,"fm":541,"tm":541,"am":541,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":5.33,"wp":[11.30923,122.6638],"wst":"matched","br":"Poblacion Ilawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.33,"text":"The title names Panay, which OpenStreetMap maps through the stated municipality, but the pin is 5.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":328},{"i":6670,"cid":"22HK0030","pid":"P00630662VS","t":"Construction of Drainage Canal, Barangay Banilad, Dumaguete City, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"DUMAGUETE CITY (CAPITAL) (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"ASHLEYKA CONSTRUCTION AND SUPPLIES","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-08-01","lat":9.27765,"lon":123.28916,"sm":534,"fm":534,"tm":534,"am":534,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banilad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5149},{"i":6671,"cid":"23HO0040","pid":"P00721684VS","t":"Construction of Flood Wall Structures along Sitio Sulok, barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"GREEN WORLD CONSTRUCTION / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":48998238.17,"abc":48998238.83,"fy":"2023","sd":"02/08/2023","cd":"2023-07-24","lat":9.642567,"lon":123.355278,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[],"run":[7606,6606],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23HO0038 to 23HO0040) cover the same site, together worth PHP 202,426,489.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":527},{"i":6672,"cid":"22GK0016","pid":"P00620099VS","t":"Construction of Flood Control Structure along Matagoy Creek (Upstream), Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"EMR BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: EMR BUILDERS)","c":29398000.0,"abc":29399996.92,"fy":"2022","sd":"02/08/2022","cd":"2022-07-17","lat":10.79679,"lon":122.98473,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Matagoy","wn":"Matagoy Creek","wd":0.58,"wp":[10.80109,122.98772],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5150},{"i":6673,"cid":"24GJ0061","pid":"P00834995VS","t":"Construction of Flood Mitigation Structures in Iloilo City- Drainage System 1, Iloilo City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"NOE'S BUILDERS","c":9899955.26,"abc":9900000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-13","lat":10.6886,"lon":122.542,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5151},{"i":6674,"cid":"23GK0008","pid":"P00721471VS","t":"Construction of Flood Control Structure, Carugiat Creek, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":96498052.34,"abc":96499996.21,"fy":"2023","sd":"02/14/2023","cd":"2024-08-07","lat":10.89389,"lon":123.0536,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Carugiat","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5152},{"i":6675,"cid":"23GP0037","pid":"P00721996VS","t":"Construction of River Control along Panay River Basin, Barangay Poblacion Ilawod, Dao, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"DAO (CAPIZ)","deo":"Capiz 2nd District Engineering Office","co":"MEGAGOLD CONSTRUCTION AND DEVELOPMENT, OPC","c":24490880.97,"abc":24499169.6,"fy":"2023","sd":"03/13/2023","cd":"2024-05-16","lat":11.40337,"lon":122.68934,"sm":482,"fm":482,"tm":482,"am":482,"md":0.0,"ls":"inside","ww":"Panay","wn":"Panay River","wd":0.27,"wp":[11.40162,122.69111],"wst":"matched","br":"Poblacion Ilawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5153},{"i":6676,"cid":"22GL0038","pid":"P00630180VS","t":"Construction of Guintubhan River Bank Slope (Upstream of Guintubhan Bridge) along Binalbagan - Isabela Road (Left Bank, Phase II), Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96016865.27,"abc":96500000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-03-09","lat":10.20793,"lon":122.94641,"sm":651,"fm":651,"tm":null,"am":651,"md":0.0,"ls":"inside","ww":"Guintubhan","wn":"Guintobhan River","wd":0.03,"wp":[10.20771,122.94657],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5154},{"i":6677,"cid":"23GK0001","pid":"P00721737VS","t":"Construction of Flood Control Structure with Esplanade of Himoga-an River, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":86848000.0,"abc":86849994.23,"fy":"2023","sd":"02/14/2023","cd":"2024-03-14","lat":10.88833,"lon":123.3556,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":"Himoga-an","wn":"Himogaan River","wd":0.07,"wp":[10.88855,123.35624],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5155},{"i":6678,"cid":"22G00119","pid":"P00634050VS","t":"Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 830.40 - Sta. 2 + 209.3, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":43423000.0,"abc":43425000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-03-04","lat":10.819903,"lon":122.985183,"sm":1456,"fm":1456,"tm":null,"am":1456,"md":0.0,"ls":"inside","ww":"Imbang","wn":"Imbang River","wd":8.32,"wp":[10.76302,123.03505],"wst":"matched","br":null,"len":378.9,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.32,"text":"The title names Imbang, which OpenStreetMap maps through the stated municipality, but the pin is 8.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":329},{"i":6679,"cid":"21GJ0068","pid":"P00521615VS","t":"Construction/Rehabilitation of Drainage System, Mandurriao, Section 2, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"VANNIE CONSTRUCTION  AND SUPPLY (FORMERLY: VANNIE","c":8774648.72,"abc":9799121.91,"fy":"2021","sd":"02/22/2022","cd":"2022-08-27","lat":10.718331,"lon":122.545405,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5156},{"i":6680,"cid":"23DL0151","pid":"P00742444LZ","t":"Construction of Slope Protection, Resiliency Complex, Brgy. Munting Parang, Tagkawayan, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"TAGKAWAYAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"BOMEL CONSTRUCTION","c":10692000.0,"abc":10692000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-10-04","lat":13.962336,"lon":122.546297,"sm":1515,"fm":1515,"tm":1515,"am":1515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Munting Parang","len":null,"ph":null,"dup":[6686],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 20,592,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1033},{"i":6681,"cid":"21GA0193","pid":"P00521760VS","t":"Construction of Revetment Wall along Aklan River, Sta. 8 + 107.75 - Sta. 8 + 680, Brgy. Tigayon, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"Kalibo","deo":"Aklan District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":92777160.39,"abc":96040000.0,"fy":"2021","sd":"05/12/2021","cd":"2023-05-29","lat":11.675504,"lon":122.346883,"sm":692,"fm":null,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.39,"wp":[11.67663,122.34351],"wst":"matched","br":"Tigayon","len":572.2,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5157},{"i":6682,"cid":"22GG0083","pid":"P00620419VS","t":"Construction of Flood Control/Slope Protection in Barotac Nuevo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC NUEVO (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":56741097.53,"abc":57900000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-06-07","lat":10.899162,"lon":122.696018,"sm":168,"fm":168,"tm":635,"am":168,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":18.36,"text":"The record contradicts itself: the municipality field and the pin point to Barotac Nuevo, Iloilo, but the title names Iloilo City, Iloilo, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":509},{"i":6683,"cid":"22GK0014","pid":"P00620097VS","t":"Construction of Flood Control Structure along Matabang River, Talisay City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":39198000.0,"abc":39199990.14,"fy":"2022","sd":"02/08/2022","cd":"2022-07-27","lat":10.717222,"lon":122.985278,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":"Matabang","wn":"Matab-ang River","wd":0.01,"wp":[10.71726,122.98536],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6695],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,196,001.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":976},{"i":6684,"cid":"23HK0044","pid":"P00732031VS","t":"Construction of Drainage Canal, Barangay Boloc-boloc, Sibulan, Negros Oriental","w":"Construction of Drainage Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"SIBULAN (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"8G CONSTRUCTION AND GENERAL SERVICES","c":4946804.4,"abc":4950000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-05-22","lat":9.335782,"lon":123.289756,"sm":1446,"fm":1446,"tm":1446,"am":1446,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Boloc-boloc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5158},{"i":6685,"cid":"22GG0084","pid":"P00620431VS","t":"Construction of Sea Wall/Storm Surge Protection, Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"PGO CONSTRUCTION","c":19188407.19,"abc":19600000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-04-03","lat":10.787766,"lon":122.69747,"sm":538,"fm":538,"tm":538,"am":538,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5159},{"i":6686,"cid":"23DL0158","pid":"P00742443LZ","t":"Construction of Slope Protection at Brgy. Munting Parang, Tagkawayan, Quezon","w":"Construction of Slope Protection Structure","rg":"Region IV-A","pv":"QUEZON","mu":"TAGKAWAYAN (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"BOMEL CONSTRUCTION","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-10-06","lat":13.962336,"lon":122.546297,"sm":1515,"fm":1515,"tm":1515,"am":1515,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Munting Parang","len":null,"ph":null,"dup":[6680],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 20,592,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1034},{"i":6687,"cid":"23GA0105","pid":"P00721987VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Tinigaw, Kalibo, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":48999994.3,"abc":49000000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-09-22","lat":11.688944,"lon":122.358124,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.11,"wp":[11.68954,122.35729],"wst":"matched","br":"Tinigaw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5160},{"i":6688,"cid":"23F00018","pid":"P00736069LZ","t":"Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":241249988.0,"abc":241249988.0,"fy":"2023","sd":"06/30/2023","cd":"2024-12-09","lat":13.45859,"lon":123.35609,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5161},{"i":6689,"cid":"24GG0116","pid":"P00821052VS","t":"Construction of Sea Wall/Storm Surge Protection With Embankment, Coastal Road, Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUMANGAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":34239725.52,"abc":34300000.0,"fy":"2024","sd":"02/12/2024","cd":"2025-02-24","lat":10.787295,"lon":122.697611,"sm":538,"fm":538,"tm":538,"am":538,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5162},{"i":6690,"cid":"22GJ0021","pid":"P00620272VS","t":"Construction of Revetment Wall along Jaro River, Brgy. San Isidro, Jaro, Iloilo City","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":95504856.13,"abc":96499990.6,"fy":"2022","sd":"02/21/2022","cd":"2023-04-05","lat":10.834761,"lon":122.549095,"sm":635,"fm":635,"tm":635,"am":1371,"md":6.0,"ls":"outside","ww":"Jaro","wn":"Jaro Floodway","wd":8.03,"wp":[10.76215,122.55103],"wst":"matched","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":71,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":6.0,"text":"The pin is 6.0 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Santa Barbara, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.65,"value":8.03,"text":"The title names Jaro, which OpenStreetMap maps through the stated municipality, but the pin is 8.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":48},{"i":6691,"cid":"23F00161","pid":"P00736132LZ","t":"Construction of Lanot Seawall, Mercedes, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":33586270.84,"abc":48249185.8,"fy":"2023","sd":"07/06/2023","cd":"2023-12-27","lat":13.850891,"lon":123.05932,"sm":967,"fm":177,"tm":967,"am":967,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":5.44,"text":"The record contradicts itself: the title and the pin point to Mercedes, Camarines Norte, but the municipality field names Basud, Camarines Norte, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":571},{"i":6692,"cid":"22G00051","pid":"P00630206VS","t":"Construction of Flood Control Structure of Himoga-an River along Bacolod North Road, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-08","lat":10.888673,"lon":123.356872,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":"Himoga-an","wn":"Himogaan River","wd":0.07,"wp":[10.88847,123.35628],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5163},{"i":6693,"cid":"22GA0034","pid":"P00620290VS","t":"Construction of Revetment Wall along Aklan River, Barangay Mobo, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"CLIFFORD CONSTRUCTION CORPORATION","c":48999996.04,"abc":49000000.0,"fy":"2022","sd":"02/04/2022","cd":"2022-09-26","lat":11.694785,"lon":122.358699,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.19,"wp":[11.69387,122.36022],"wst":"matched","br":"Mobo","len":null,"ph":null,"dup":[6704],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 97,999,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1087},{"i":6694,"cid":"22GO0109","pid":"P00633213VS","t":"Construction of Drainage System with Footbridge, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"KENBE CONSTRUCTION & SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-09-28","lat":10.6753,"lon":122.9472,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5164},{"i":6695,"cid":"22GK0018","pid":"P00620102VS","t":"Construction of Flood Control Structure of Matab-ang River along Bacolod North Rd, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48998001.04,"abc":48999992.63,"fy":"2022","sd":"02/08/2022","cd":"2022-12-02","lat":10.717222,"lon":122.985278,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":"Matab-ang","wn":"Matab-ang River","wd":0.01,"wp":[10.71726,122.98536],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6683],"run":[],"cl":[],"L":"field","s":25,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,196,001.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":891},{"i":6696,"cid":"23GK0007","pid":"P00721660VS","t":"Construction of Flood Control Structure, Matagoy Creek, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"XA CONSTRUCTION","c":25478000.0,"abc":25479993.35,"fy":"2023","sd":"02/13/2023","cd":"2023-08-02","lat":10.79559,"lon":122.98608,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Matagoy","wn":"Matagoy Creek","wd":0.63,"wp":[10.80109,122.98772],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6697],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 53,691,217.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1131},{"i":6697,"cid":"24GK0007","pid":"P00820175VS","t":"Construction of Flood Control Structure of Matagoy Creek, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"XA CONSTRUCTION","c":28213217.31,"abc":28213216.63,"fy":"2024","sd":"02/14/2024","cd":"2024-07-22","lat":10.79559,"lon":122.98608,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Matagoy","wn":"Matagoy Creek","wd":0.63,"wp":[10.80109,122.98772],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6696],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 53,691,217.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1132},{"i":6698,"cid":"24GK0008","pid":"P00820176VS","t":"Construction of Flood Control Structure of Matigay Creek, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":28213216.9,"abc":28213212.73,"fy":"2024","sd":"02/14/2024","cd":"2024-06-17","lat":10.80222,"lon":122.9872,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":"Matigay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5165},{"i":6699,"cid":"22HJ0048","pid":"P00620138VS","t":"Construction of Flood Control along Kinayan River, Sta. 0+000 - Sta. 0+500 (BS, US), Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-11-23","lat":10.19771,"lon":123.29287,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Kinayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5166},{"i":6700,"cid":"22GK0179","pid":"P00633001VS","t":"Construction of Seawall with breakwater, Brgy. 6-A, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":9798000.0,"abc":9799953.3,"fy":"2022","sd":"03/30/2022","cd":"2022-07-15","lat":10.91077,"lon":123.06053,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"6-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5167},{"i":6701,"cid":"21GG0149","pid":"P00521605VS","t":"Construction of Sea Wall/Storm Surge Protection With Embankment, Coastal Road, Dumangas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"Dumangas","deo":"Iloilo 2nd District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":22602830.0,"abc":23520000.0,"fy":"2021","sd":"03/29/2022","cd":"2023-01-01","lat":10.787413,"lon":122.697637,"sm":538,"fm":null,"tm":538,"am":538,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5168},{"i":6702,"cid":"23FD0020","pid":"P00740487LZ","t":"Construction of Riverbank Protection Structure along Libmanan River, Brgy. Awayan Section, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":82024887.0,"abc":82024895.94,"fy":"2023","sd":"04/19/2023","cd":"2023-12-06","lat":13.741852,"lon":122.987859,"sm":1464,"fm":1464,"tm":1464,"am":781,"md":0.08,"ls":"boundary","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.74141,122.988],"wst":"matched","br":"Awayan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5169},{"i":6703,"cid":"23GE0010","pid":"P00721475VS","t":"Construction of Flood Control System in Baragnay Cabalagnan, Nueva Valencia, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"NUEVA VALENCIA (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":57868773.82,"abc":57900000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-02","lat":10.416625,"lon":122.549518,"sm":1028,"fm":1028,"tm":1028,"am":1028,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5170},{"i":6704,"cid":"23GA0106","pid":"P00721988VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Mobo, Kalibo, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"CLIFFORD CONSTRUCTION CORPORATION","c":48999989.53,"abc":49000000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-10-16","lat":11.694785,"lon":122.358699,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.19,"wp":[11.69387,122.36022],"wst":"matched","br":"Mobo","len":null,"ph":null,"dup":[6693],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 97,999,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1088},{"i":6705,"cid":"21JB0085","pid":"P00522145MN","t":"Construction of Flood Control Structure along Dicayo River (Downstream) Bothsides, Barangay Dos, Katipunan, Zamboanga del Norte\nPackage 1","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"Katipunan","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"DIPOLOG TOP CONSTRUCTION & DEVT. CORP","c":36500234.62,"abc":37641800.0,"fy":"2021","sd":"02/16/2021","cd":"2024-09-30","lat":8.512193,"lon":123.292964,"sm":702,"fm":null,"tm":702,"am":702,"md":0.0,"ls":"inside","ww":"Dicayo","wn":"Dicayo River","wd":0.08,"wp":[8.51255,123.29358],"wst":"matched","br":"Dos","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5171},{"i":6706,"cid":"23GK0162","pid":"P00733300VS","t":"Construction of Seawall with breakwater, Brgy. 6A, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":29399997.54,"abc":29399997.54,"fy":"2023","sd":"04/04/2023","cd":"2023-09-20","lat":10.9159,"lon":123.0628,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"6A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5172},{"i":6707,"cid":"24HL0046","pid":"P00820405VS","t":"Construction of Pagatban River Control, Upstream, Pagatban, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-10-24","lat":9.384196,"lon":122.713336,"sm":368,"fm":368,"tm":null,"am":172,"md":0.25,"ls":"boundary","ww":"Pagatban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5173},{"i":6708,"cid":"22GL0033","pid":"P00630176VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan (Bagacay) Br. (Left Bank), Brgy. Aranda, Hinigaran, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"HINIGARAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":96499992.0,"abc":96500000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-09-30","lat":10.23444,"lon":122.94765,"sm":622,"fm":622,"tm":622,"am":622,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.05,"wp":[10.23461,122.94803],"wst":"matched","br":"Aranda","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5174},{"i":6709,"cid":"22FN0033","pid":"P00620726LZ","t":"Construction of Dike along Bato Lake, San Vicente Section, Bato, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"BATO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION)","c":48999292.44,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-15","lat":13.35786,"lon":123.35714,"sm":182,"fm":182,"tm":182,"am":182,"md":0.0,"ls":"inside","ww":"Bato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5175},{"i":6710,"cid":"23GE0009","pid":"P00721474VS","t":"Construction of Flood Mitigation Structure along Cabalagnan River, Barangay Cabalagnan, Nueva Valencia, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"NUEVA VALENCIA (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":57895645.35,"abc":57900000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-10-25","lat":10.416586,"lon":122.549614,"sm":1028,"fm":1028,"tm":1028,"am":1028,"md":0.0,"ls":"inside","ww":"Cabalagnan","wn":"Cabalagnan River","wd":0.01,"wp":[10.41652,122.54955],"wst":"matched","br":"Cabalagnan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5176},{"i":6711,"cid":"24FG0053","pid":"P00824783LZ","t":"Construction of Flood Control Structure in Cagliliog, Tinambac, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TINAMBAC (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-11-11","lat":13.904836,"lon":123.293258,"sm":1567,"fm":1567,"tm":1567,"am":1567,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5177},{"i":6712,"cid":"23GK0054","pid":"P00731613VS","t":"Rehabilitation of Flood Control Structure along Malihaw River (Phase I), Barangay VI-A and Barangay IX,Victorias City, Negros Occidental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":86847967.0,"abc":86849986.31,"fy":"2023","sd":"02/14/2023","cd":"2023-11-24","lat":10.91612,"lon":123.06306,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Malihaw","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"VI-A","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5178},{"i":6713,"cid":"22HL0039","pid":"P00620318VS","t":"Rehabilitation of Pagatban River Control, Upstream B, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":40709200.0,"abc":40709200.0,"fy":"2022","sd":"03/15/2022","cd":"2023-03-18","lat":9.38583,"lon":122.71361,"sm":368,"fm":368,"tm":368,"am":172,"md":0.09,"ls":"boundary","ww":"Pagatban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5179},{"i":6714,"cid":"24JB0033","pid":"P00820003MN","t":"Construction of Flood Control Structure along Layawan River, Dapdap Bridge Upstream, Polanco, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"POLANCO (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":77584062.83,"abc":77584070.0,"fy":"2024","sd":"03/20/2024","cd":"2024-10-27","lat":8.512487,"lon":123.357947,"sm":1156,"fm":1156,"tm":1156,"am":1156,"md":0.0,"ls":"inside","ww":"Layawan","wn":"Layawan River","wd":0.02,"wp":[8.51247,123.35813],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5180},{"i":6715,"cid":"22GK0017","pid":"P00620101VS","t":"Construction of Flood Control Structure of Logoy River along Bacolod Silay Airport Access Road Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":48997999.0,"abc":48999991.11,"fy":"2022","sd":"02/08/2022","cd":"2022-08-07","lat":10.709444,"lon":122.990278,"sm":427,"fm":427,"tm":null,"am":427,"md":0.0,"ls":"inside","ww":"Logoy","wn":"Logoy Creek","wd":3.41,"wp":[10.68458,123.0088],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.41,"text":"The title names Logoy, which OpenStreetMap maps through the stated municipality, but the pin is 3.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":369},{"i":6716,"cid":"22GG0089","pid":"P00620435VS","t":"Construction of Flood Control Structure along Jalaur River, Brgy. Delgado (Gamma Grande), Calinog, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CALINOG (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"EARLY RISER CONSTRUCTION / CMG JR. BUILDERS","c":34299962.78,"abc":34300000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-10-30","lat":11.12084,"lon":122.55008,"sm":306,"fm":306,"tm":306,"am":306,"md":0.0,"ls":"inside","ww":"Jalaur","wn":"Jalaur River","wd":0.02,"wp":[11.12083,122.55028],"wst":"matched","br":"Delgado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5181},{"i":6717,"cid":"22GO0094","pid":"P00620423VS","t":"Construction of Revetment with Floodwall along Mambuloc Creek, Phase 2, Bacolod City","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SILVERRIA CONSTRUCTION AND CONSTRUCTION SUPPLY COMPANY, OPC","c":15515114.99,"abc":16331700.0,"fy":"2022","sd":"03/25/2022","cd":"2023-08-28","lat":10.677018,"lon":122.947689,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Mambuloc","wn":"Mambuloc Creek","wd":0.01,"wp":[10.67703,122.94776],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5182},{"i":6718,"cid":"24HJ0064","pid":"P00820195VS","t":"Construction of Box Culvert along Mabinay-Ayungon Rd, Ayungon, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"AYUNGON (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"HIGEL CONSTRUCTION","c":2940000.0,"abc":2940000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-16","lat":9.905372,"lon":123.063206,"sm":85,"fm":85,"tm":85,"am":1554,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5183},{"i":6719,"cid":"23HL0048","pid":"P00721688VS","t":"Construction of Pagatban River Control, Upstream, Pagatban, City of Bayawan, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-12-03","lat":9.38611,"lon":122.71389,"sm":368,"fm":368,"tm":368,"am":172,"md":0.05,"ls":"boundary","ww":"Pagatban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5184},{"i":6720,"cid":"24GA0132","pid":"P00821159VS","t":"Construction of Revetment Wall along Aklan River, Brgy. Mobo, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"CLIFFORD CONSTRUCTION CORPORATION","c":28949995.94,"abc":28950000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-09","lat":11.705699,"lon":122.35973,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.17,"wp":[11.70627,122.36114],"wst":"matched","br":"Mobo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5185},{"i":6721,"cid":"22GJ0064","pid":"P00630205VS","t":"Rehabilitation of Iloilo Flood Control Project, Section 3, Iloilo City, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":41650000.0,"abc":41012500.0,"fy":"2022","sd":"08/15/2022","cd":"2023-08-08","lat":10.756783,"lon":122.55422,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01554,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":815},{"i":6722,"cid":"24HJ0052","pid":"P00820200VS","t":"Construction of Flood Control along Kinayan River, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"ALEXANDRIA CONSTRUCTION AND SUPPLY","c":14624973.33,"abc":14700000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-08-05","lat":10.19637,"lon":123.29401,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Kinayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5186},{"i":6723,"cid":"22FE0023","pid":"P00620718LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Inalahan, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48024732.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.691378,"lon":123.063308,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.1,"wp":[13.69215,123.06287],"wst":"matched","br":"Inalahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5187},{"i":6724,"cid":"22GJ0063","pid":"P00630204VS","t":"Rehabilitation of Iloilo Flood Control Project, Section 2, Jaro, Iloilo City, Iloilo","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":41650000.0,"abc":41012500.0,"fy":"2022","sd":"08/15/2022","cd":"2023-08-13","lat":10.757455,"lon":122.554368,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01554,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":816},{"i":6725,"cid":"23GA0038","pid":"P00721725VS","t":"Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"MAKATO (AKLAN)","deo":"Aklan District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":86849862.21,"abc":86850000.0,"fy":"2023","sd":"02/07/2023","cd":"2024-02-01","lat":11.724075,"lon":122.361501,"sm":1029,"fm":884,"tm":1029,"am":1029,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":1.13,"wp":[11.73398,122.36412],"wst":"matched","br":"Pusiw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.58,"text":"The record contradicts itself: the title and the pin point to Numancia, Aklan, but the municipality field names Makato, Aklan, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":485},{"i":6726,"cid":"22HL0038","pid":"P00620317VS","t":"Rehabilitation of Pagatban River Control, Upstream A, Bayawan City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":29782200.0,"abc":29782200.0,"fy":"2022","sd":"03/21/2022","cd":"2023-02-22","lat":9.39028,"lon":122.715,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Pagatban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5188},{"i":6727,"cid":"24GO0041","pid":"P00832623VS","t":"Construction of Drainaige System, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"SILVERRIA CONSTRUCTION AND CONSTRUCTION SUPPLY COMPANY, OPC","c":6435000.0,"abc":6435000.0,"fy":"2024","sd":"04/03/2024","cd":"2024-07-21","lat":10.68839,"lon":122.99055,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5189},{"i":6728,"cid":"21GO0078","pid":"P00521583VS","t":"Construction of Revetment with Floodwall along Banago Creek (Phase 2), Sta. 0+000 to Sta. 1+947, Bacolod City, Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"Bacolod City","deo":"Bacolod City District Engineering Office","co":"SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC.","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"10/07/2021","cd":"2023-10-30","lat":10.70356,"lon":122.947763,"sm":95,"fm":null,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Banago","wn":"Banago Creek","wd":0.01,"wp":[10.70363,122.94787],"wst":"matched","br":null,"len":1947.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5190},{"i":6729,"cid":"22GL0032","pid":"P00630177VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan (Bagacay) Br. (Right Bank), Brgy. Rumirang, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":96496538.43,"abc":96500000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-21","lat":10.23594,"lon":122.94811,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.23599,122.94784],"wst":"matched","br":"Rumirang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5191},{"i":6730,"cid":"20FN0097","pid":"P00448880LZ","t":"Rehabilation of Flood Control, Baao Lake Outfall Intersection Bicol River, Sta 0+000.00 - Sta 0+700.00, Nubua, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":null,"deo":"Camarines Sur 5th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":70888755.4,"abc":74250000.0,"fy":"2020","sd":"12/07/2020","cd":"2022-08-16","lat":13.445593,"lon":123.294456,"sm":null,"fm":null,"tm":null,"am":247,"md":null,"ls":"unknown","ww":"Outfall Intersection Bicol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":148},{"i":6731,"cid":"22JD0060","pid":"P00620003MN","t":"Construction of Flood Control Structure (Revetment/Bank Protection) along Layawan River, Dapdap Bridge (Labrador Section), Polanco, Zamboanga del Norte","w":"Construction of Revetment","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"POLANCO (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":66096928.66,"abc":66100000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-05-13","lat":8.513056,"lon":123.358889,"sm":1156,"fm":1156,"tm":1156,"am":1156,"md":0.0,"ls":"inside","ww":"Layawan","wn":"Layawan River","wd":0.05,"wp":[8.51332,123.35852],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5192},{"i":6732,"cid":"22FC0118","pid":"P00620282LZ","t":"Construction of Daet River Control Structure, Brgy. Camambugan, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)","c":82021322.03,"abc":82024458.68,"fy":"2022","sd":"03/16/2022","cd":"2022-11-22","lat":14.11445,"lon":122.948903,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Daet","wn":"Daet River","wd":0.02,"wp":[14.11467,122.94892],"wst":"matched","br":"Camambugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5193},{"i":6733,"cid":"20FN0097","pid":"P00448880LZ","t":"Rehabilation of Flood Control, Baao Lake Outfall Intersection Bicol River, Sta 0+000.00 - Sta 0+700.00, Nubua, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":null,"deo":"Camarines Sur 5th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":70888755.4,"abc":74250000.0,"fy":"2021","sd":"12/07/2020","cd":"2022-08-16","lat":13.445593,"lon":123.294456,"sm":null,"fm":null,"tm":null,"am":247,"md":null,"ls":"unknown","ww":"Outfall Intersection Bicol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":149},{"i":6734,"cid":"24GQ0027","pid":"P00820012VS","t":"Construction of Flood Control Structure, Mabuni River along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"WILKINSON CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-10-03","lat":10.44611,"lon":123.35944,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Mabuni","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5194},{"i":6735,"cid":"23GK0055","pid":"P00731614VS","t":"Construction of Foreshore Protection, Zone IV, Barangay VI-A and Barangay IX, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":53072822.0,"abc":53074992.48,"fy":"2023","sd":"02/14/2023","cd":"2023-10-17","lat":10.9051,"lon":123.06459,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"VI-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5195},{"i":6736,"cid":"23GJ0068","pid":"P00733723VS","t":"Rehabilitation of Drainage, Brgy. San Jose Jaro, Iloilo City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":4929675.72,"abc":4950000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-09-21","lat":10.736291,"lon":122.554492,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose Jaro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5196},{"i":6737,"cid":"22GD0068","pid":"P00633215VS","t":"Construction of Drainage System, Barangay Dayao, Roxas City, Capiz","w":"Construction of Drainage Structure","rg":"Region VI","pv":"CAPIZ","mu":"ROXAS CITY (CAPITAL) (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION","c":4949423.38,"abc":4950000.0,"fy":"2022","sd":"05/31/2022","cd":"2022-10-31","lat":11.587433,"lon":122.731435,"sm":1225,"fm":1225,"tm":1225,"am":1225,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dayao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5197},{"i":6738,"cid":"24FD0004","pid":"P00821006LZ","t":"Construction of Libmanan Cabusao PIS Intake Slope Protection, Sipocot, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIPOCOT (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":9680309.0,"abc":9799395.54,"fy":"2024","sd":"03/01/2024","cd":"2024-05-01","lat":13.742394,"lon":122.9907,"sm":1464,"fm":1464,"tm":1464,"am":781,"md":0.12,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5198},{"i":6739,"cid":"24F00191","pid":"P00820469LZ","t":"Construction of Flood Mitigation Structure along Calagdo River, Barangay Tuaca, Basud Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":154399262.8,"abc":154399294.6,"fy":"2024","sd":"04/08/2024","cd":"2024-11-30","lat":13.966428,"lon":122.948905,"sm":177,"fm":177,"tm":null,"am":177,"md":0.0,"ls":"inside","ww":"Calagdo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tuaca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5199},{"i":6740,"cid":"22HK0084","pid":"P00630227VS","t":"Construction of Flood Mitigation Structure (Shore Protection), Barangay Calindagan (from the mouth of Banica River) to Barangay Mangnao, Dumaguete City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"DUMAGUETE CITY (CAPITAL) (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"SUPREME MEGA STRUCTURE BUILDERS, INC. / SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/27/2022","cd":"2023-11-20","lat":9.28361,"lon":123.295278,"sm":534,"fm":534,"tm":534,"am":534,"md":0.0,"ls":"inside","ww":"Banica","wn":"Banica River","wd":2.14,"wp":[9.3019,123.30154],"wst":"matched","br":"Calindagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5200},{"i":6741,"cid":"22G00109","pid":"P00620292VS","t":"Construction of Revetment Wall along Aklan River, Sitio Libtong, Brgy. Estancia, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION","c":48249999.5,"abc":48250000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-05-15","lat":11.696781,"lon":122.36258,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.11,"wp":[11.69713,122.36163],"wst":"matched","br":"Estancia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5201},{"i":6742,"cid":"23FE0101","pid":"P00736129LZ","t":"Construction of Revetment along Libmanan River, Barangay Rongos, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":52205593.07,"abc":52232555.0,"fy":"2023","sd":"07/03/2023","cd":"2024-03-15","lat":13.667289,"lon":123.064902,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.07,"wp":[13.66776,123.06531],"wst":"matched","br":"Rongos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5202},{"i":6743,"cid":"23HK0070","pid":"P00721781VS","t":"Rehabilitation of Lumbangan River Control, Mabinay, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MABINAY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":53557500.0,"abc":53557500.0,"fy":"2023","sd":"02/17/2023","cd":"2023-11-30","lat":9.6881,"lon":122.94899,"sm":841,"fm":841,"tm":841,"am":841,"md":0.0,"ls":"inside","ww":"Lumbangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5203},{"i":6744,"cid":"23J00024","pid":"P00721212MN","t":"Construction of Flood Control Structure along Salug River at Salug Br. Section (B00528MN) along Sindangan - Liloy Road (S01142MN), Salug, Zamboanga del Norte (Upstream - Bothsides) Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SALUG (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION / DOMNPHIL CONSTRUCTION","c":110974998.9,"abc":110975000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-11-22","lat":8.104327,"lon":122.75115,"sm":1243,"fm":1243,"tm":1243,"am":1243,"md":0.0,"ls":"inside","ww":"Salug","wn":"Salug River","wd":0.08,"wp":[8.1041,122.75186],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5204},{"i":6745,"cid":"24GK0154","pid":"P00834559VS","t":"Construction of Flood Control Structure along Catabla River, Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":96498004.56,"abc":96499989.11,"fy":"2024","sd":"03/13/2024","cd":"2024-11-01","lat":10.705278,"lon":122.9913,"sm":427,"fm":427,"tm":427,"am":427,"md":0.0,"ls":"inside","ww":"Catabla","wn":"Catabla River","wd":5.02,"wp":[10.74847,122.97706],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":5.02,"text":"The title names Catabla, which OpenStreetMap maps through the stated municipality, but the pin is 5.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":279},{"i":6746,"cid":"22JB0001","pid":"P00620111MN","t":"Construction of Flood Control Structure along Dicayo River (Downstream), Barangay Dos, Katipunan, Zamboanga del Norte (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"KATIPUNAN (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION","c":39708089.93,"abc":39808090.0,"fy":"2022","sd":"02/10/2022","cd":"2024-09-30","lat":8.50624,"lon":123.29871,"sm":702,"fm":702,"tm":702,"am":702,"md":0.0,"ls":"inside","ww":"Dicayo","wn":"Dicayo River","wd":0.08,"wp":[8.50574,123.29919],"wst":"matched","br":"Dos","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5205},{"i":6747,"cid":"23GA0124","pid":"P00721989VS","t":"Construction of Flood Control / Revetment Wall along Aklan River, Barangay Bakhaw Norte, Kalibo, Aklan","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":48999993.67,"abc":49000000.0,"fy":"2023","sd":"04/28/2023","cd":"2024-01-22","lat":11.7181,"lon":122.364632,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":0.85,"wp":[11.71224,122.35961],"wst":"matched","br":"Bakhaw Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5206},{"i":6748,"cid":"23F00084","pid":"P00725902LZ","t":"Construction of Agos River - Bato - Lake Flood Control, Sta. Cruz - San Vicente, Bato, Section, Bato, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BATO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":121061136.6,"abc":121061136.6,"fy":"2023","sd":"03/27/2023","cd":"2024-03-31","lat":13.36148,"lon":123.360514,"sm":182,"fm":182,"tm":182,"am":182,"md":0.0,"ls":"inside","ww":"Agos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5207},{"i":6749,"cid":"22GK0094","pid":"P00630639VS","t":"Construction of Flood Mitigation Structures / Drainage System, Victorias City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"KENBE CONSTRUCTION & SUPPLY","c":11778985.0,"abc":11780999.11,"fy":"2022","sd":"02/08/2022","cd":"2022-07-17","lat":10.903056,"lon":123.066389,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5208},{"i":6750,"cid":"22GO0108","pid":"P00632029VS","t":"Construction of Drainage System, Bacolod City, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"ALTA NEGROS INDUSTRIAL SUPPLY CORPORATION","c":16830000.0,"abc":16830000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-02-27","lat":10.6822,"lon":122.9924,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5209},{"i":6751,"cid":"23GK0068","pid":"P00732019VS","t":"Construction of Flood Control Structure (Breakwater), Barangay Balaring, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":5938000.0,"abc":5939829.15,"fy":"2023","sd":"02/13/2023","cd":"2023-05-07","lat":10.83691,"lon":122.94905,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balaring","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5210},{"i":6752,"cid":"22GJ0020","pid":"P00620017VS","t":"Construction of Slope Protection, Brgy. Tabuc Suba, Jaro, Iloilo City","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":49840615.93,"abc":50690967.5,"fy":"2022","sd":"04/11/2022","cd":"2023-11-27","lat":10.731644,"lon":122.555837,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabuc Suba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5211},{"i":6753,"cid":"23J00023","pid":"P00721211MN","t":"Construction of Flood Control Structure along Salug River at Salug Br. Section (B00528MN) along Sindangan - Liloy Road (S01142MN), Salug, Zamboanga del Norte (Downstream - Bothsides) Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SALUG (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":110528273.3,"abc":110975000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-11-22","lat":8.10581,"lon":122.752528,"sm":1243,"fm":1243,"tm":1243,"am":1243,"md":0.0,"ls":"inside","ww":"Salug","wn":"Salug River","wd":0.02,"wp":[8.10585,122.75238],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5212},{"i":6754,"cid":"24FG0045","pid":"P00824782LZ","t":"Construction of Flood Control Structure/Seawall in Brgy. Tandoc, Siruma, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SIRUMA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/18/2024","cd":"2024-10-16","lat":14.051866,"lon":123.298951,"sm":1467,"fm":1467,"tm":1467,"am":1467,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tandoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5213},{"i":6755,"cid":"22GK0004","pid":"P00620104VS","t":"Construction of Flood Control Structure of Sangay River (downstream) along Bacolod North Road, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":44097954.14,"abc":44099946.95,"fy":"2022","sd":"02/08/2022","cd":"2022-11-05","lat":10.903157,"lon":123.362698,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":"Sangay","wn":"Sangay River","wd":11.54,"wp":[10.94798,123.26735],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5214},{"i":6756,"cid":"23FC0024","pid":"P00737556LZ","t":"Construction of Flood Mitigation Structure, Barangay Salvacion, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"GREAT WALL ENGINEERING","c":9765731.14,"abc":9899549.73,"fy":"2023","sd":"04/05/2023","cd":"2023-06-28","lat":14.23694,"lon":122.36658,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5215},{"i":6757,"cid":"23GK0159","pid":"P00733301VS","t":"Construction of Flood Control Structures along Magnanod River, Brgy. 2, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"KENBE CONSTRUCTION & SUPPLY","c":9799993.26,"abc":9799993.26,"fy":"2023","sd":"04/04/2023","cd":"2023-08-19","lat":10.8975,"lon":123.0719,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Magnanod","wn":"Magnanod River","wd":0.0,"wp":[10.89746,123.0719],"wst":"matched","br":"2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5216},{"i":6758,"cid":"24GL0041","pid":"P00820001VS","t":"Construction of Binalbagan River Bank Slope Protection along Jct. Bagonawa - La Castellana - Isabela road Brgy. 5 Poblacion, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":95052356.29,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-08-05","lat":10.2274,"lon":122.993,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.09,"wp":[10.22793,122.99358],"wst":"matched","br":"5 Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5217},{"i":6759,"cid":"24GK0159","pid":"P00834639VS","t":"Construction of Drainage System, Brgy. 6, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SL & G CONSTRUCTION","c":9797929.22,"abc":9899991.56,"fy":"2024","sd":"03/13/2024","cd":"2024-06-22","lat":10.910277,"lon":123.076111,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"6","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5218},{"i":6760,"cid":"22FC0107","pid":"P00631403LZ","t":"Construction of Flood Control, Barangay San Nicolas, Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":42139864.61,"abc":42139864.61,"fy":"2022","sd":"03/15/2022","cd":"2022-09-16","lat":14.142081,"lon":122.949425,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5219},{"i":6761,"cid":"23GK0002","pid":"P00721470VS","t":"Construction of Seawall at Barangay Zone I, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / GKMM CONSTRUCTION & SUPPLIES, INC. (FORMERLY: GKMM CONSTRUCTION & SUPPLIES)","c":86846790.0,"abc":86849997.34,"fy":"2023","sd":"02/14/2023","cd":"2023-11-20","lat":10.962832,"lon":123.299083,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5220},{"i":6762,"cid":"23GJ0069","pid":"P00733730VS","t":"Construction of Drainage System in Jaro District, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"ABELARDE BUILDERS AND SUPPLY","c":9849144.79,"abc":9900000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-09-22","lat":10.725029,"lon":122.556446,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5221},{"i":6763,"cid":"21J00015","pid":"P00522029MN","t":"Construction of Flood Control along Kabasalan River (Phase II), FL Pena, Kabasalan, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"Kabasalan","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":114564540.7,"abc":115719689.6,"fy":"2021","sd":"02/22/2021","cd":"2022-09-07","lat":7.804069,"lon":122.753053,"sm":683,"fm":null,"tm":683,"am":683,"md":0.0,"ls":"inside","ww":"Kabasalan","wn":"Kabasalan River","wd":0.02,"wp":[7.80421,122.75315],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5222},{"i":6764,"cid":"22DL0023","pid":"P00621100LZ","t":"Construction of Flood Control and Drainage Structure along Calauag River, Lopez, Quezon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"LOPEZ (QUEZON)","deo":"Quezon 4th District Engineering Office","co":"TG SURCON BUILDERS INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-21","lat":13.824333,"lon":122.370475,"sm":809,"fm":809,"tm":809,"am":809,"md":0.0,"ls":"inside","ww":"Calauag","wn":"Calauag River","wd":0.01,"wp":[13.8242,122.37047],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5223},{"i":6765,"cid":"23HO0201","pid":"P00733279VS","t":"Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493771.15,"abc":96493832.09,"fy":"2023","sd":"05/05/2023","cd":"2024-01-11","lat":9.777909,"lon":123.365561,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Legaspi","len":null,"ph":"Package 2","dup":[6770],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,987,593.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":778},{"i":6766,"cid":"22GK0150","pid":"P00620408VS","t":"Construction of Flood Control Structure of Banago River along Bacolod, Construction of Flood Mitigation Structure Silay Airport Access Road. Talisay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF TALISAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":48998000.0,"abc":48999989.07,"fy":"2022","sd":"03/30/2022","cd":"2022-11-25","lat":10.7125,"lon":122.993333,"sm":427,"fm":427,"tm":null,"am":427,"md":0.0,"ls":"inside","ww":"Banago","wn":"Banago River","wd":0.02,"wp":[10.71263,122.99324],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5224},{"i":6767,"cid":"21HK0083","pid":"P00549969VS","t":"Reconstruction/ Rehabilitation of Tanjay River Control, Datagon And Balayong Pamplona Section, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":null,"deo":"Negros Oriental 2nd District Engineering Office","co":"UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION &","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"10/22/2021","cd":"2022-12-23","lat":9.45766,"lon":123.07649,"sm":null,"fm":null,"tm":null,"am":1076,"md":null,"ls":"unknown","ww":"Tanjay","wn":"Tanjay River","wd":0.04,"wp":[9.45766,123.07613],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":150},{"i":6768,"cid":"22GK0019","pid":"P00620105VS","t":"Construction of Flood Control Structure, Bagacay River along Bacolod Silay Airport Access Road, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":48997998.0,"abc":48999965.8,"fy":"2022","sd":"02/08/2022","cd":"2022-09-16","lat":10.75764,"lon":122.9972,"sm":1456,"fm":1456,"tm":1456,"am":427,"md":0.11,"ls":"boundary","ww":"Bagacay","wn":"Bagacay Creek","wd":0.02,"wp":[10.75752,122.99729],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5225},{"i":6769,"cid":"23GE0039","pid":"P00721868VS","t":"Construction of Flood Control System in Barangay Canhawan, Nueva Valencia, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"NUEVA VALENCIA (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":57899915.92,"abc":57900000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-27","lat":10.429344,"lon":122.560093,"sm":1028,"fm":1028,"tm":1028,"am":1028,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canhawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5226},{"i":6770,"cid":"23HO0202","pid":"P00733280VS","t":"Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493822.06,"abc":96493838.37,"fy":"2023","sd":"05/05/2023","cd":"2023-09-21","lat":9.777909,"lon":123.365561,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Legaspi","len":null,"ph":"Package 3","dup":[6765],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,987,593.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":779},{"i":6771,"cid":"24F00207","pid":"P00845842LZ","t":"Contstruction of Flood Mitigation Structure Magang-Mancruz Creek, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"888RV CONSTRUCTION AND SUPPLIES","c":4949985.81,"abc":4949985.81,"fy":"2024","sd":"05/31/2024","cd":"2024-08-05","lat":14.0931,"lon":122.9495,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Magang-Mancruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5227},{"i":6772,"cid":"23GA0107","pid":"P00721923VS","t":"Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":29399989.61,"abc":29400000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-11-23","lat":11.71899,"lon":122.371339,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":1.48,"wp":[11.71224,122.35961],"wst":"matched","br":"Bakhaw Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5228},{"i":6773,"cid":"22GK0178","pid":"P00632999VS","t":"Construction of Flood Control Structure, Magnanod River, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":24498000.0,"abc":24499930.64,"fy":"2022","sd":"03/30/2022","cd":"2022-08-30","lat":10.895833,"lon":123.0775,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Magnanod","wn":"Magnanod River","wd":0.02,"wp":[10.89579,123.07766],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5229},{"i":6774,"cid":"24JF0043","pid":"P00835861MN","t":"Construction of Flood Control Structure with Drainage and Line Canal, Sta.0+000 - Sta. 0+678, Barangay Canacan, Kabasalan, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"KABASALAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"DEBRIS ENTERPRISES AND CONSTRUCTION","c":20431934.07,"abc":29400000.0,"fy":"2024","sd":"07/15/2024","cd":"2025-01-20","lat":7.80913,"lon":122.7541,"sm":683,"fm":683,"tm":683,"am":683,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Canacan","len":678.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5230},{"i":6775,"cid":"24FF0035","pid":"P00846122LZ","t":"Construction of Flood Mitigation Structure (Spillway), Brgy. Tinangis, Pili, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PILI (CAPITAL) (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":9693474.21,"abc":9799903.37,"fy":"2024","sd":"04/05/2024","cd":"2024-08-08","lat":13.620538,"lon":123.300642,"sm":1137,"fm":1137,"tm":1137,"am":1137,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinangis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5231},{"i":6776,"cid":"23GO0023","pid":"P00721628VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Rosario St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"GOLDSTAR MARKETING & CONSTRUCTION SERVICES, INC.","c":28963474.65,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-28","lat":10.662225,"lon":122.949617,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5232},{"i":6777,"cid":"23G00069","pid":"P00721864VS","t":"Construction of Seawall (Section 9), Iloilo City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY / A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-12-18","lat":10.690497,"lon":122.560719,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5233},{"i":6778,"cid":"22GA0032","pid":"P00620288VS","t":"Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"KALIBO (CAPITAL) (AKLAN)","deo":"Aklan District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":48999996.13,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-09","lat":11.720122,"lon":122.371829,"sm":692,"fm":692,"tm":692,"am":692,"md":0.0,"ls":"inside","ww":"Aklan","wn":"Aklan River","wd":1.59,"wp":[11.71224,122.35961],"wst":"matched","br":"Bakhaw Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5234},{"i":6779,"cid":"24GK0073","pid":"P00832633VS","t":"Construction of Drainage System, Barangay 13, Victorias City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CBCL CONSTRUCTION & SUPPLY","c":9899999.42,"abc":9899998.79,"fy":"2024","sd":"02/19/2024","cd":"2024-06-07","lat":10.90608,"lon":123.07865,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"13","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5235},{"i":6780,"cid":"23HO0232","pid":"P00745596VS","t":"Repair/ Rehabilitation/ Reconstruction of Damaged Matutinao River Flood Control System (Upstream Section 1), Badian, Cebu, Sta. 0+000.00 to Sta. 0+182.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":71744573.2,"abc":71745219.27,"fy":"2023","sd":"08/10/2023","cd":"2024-04-24","lat":9.809173,"lon":123.367963,"sm":101,"fm":101,"tm":362,"am":101,"md":0.0,"ls":"inside","ww":"Damaged Matutinao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":182.0,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":72.69,"text":"The record contradicts itself: the municipality field and the pin point to Badian, Cebu, but the title names Cebu City, Cebu, 73 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":510},{"i":6781,"cid":"22GL0030","pid":"P00620242VS","t":"Construction of Binalbagan River Bank Slope Protection (Upstream of Binalbagan Bagacay Bridge) Along Hinigaran-Isabela Rd, Negros Occidental (Phase III Right Bank)","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"R.A. CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: R.A. CONSTRUCTION & GENERAL MERCHANDISE) / JAIME B. CHING ENTERPRISES","c":96499995.37,"abc":96500000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-01-21","lat":10.23352,"lon":122.94987,"sm":651,"fm":651,"tm":null,"am":622,"md":0.03,"ls":"boundary","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.23375,122.94971],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5236},{"i":6782,"cid":"22GK0086","pid":"P00630634VS","t":"Construction of Flood Control including Drainage Structure, Barangay Tinampaan, Cadiz City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"PJD CONSTRUCTION AND SUPPLY","c":9897858.0,"abc":9899993.28,"fy":"2022","sd":"02/08/2022","cd":"2022-08-01","lat":10.93146,"lon":123.30215,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinampaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5237},{"i":6783,"cid":"23GJ0027","pid":"P00733721VS","t":"Construction of Drainage System in Jaro, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"LUCKY H&K CONSTRUCTION","c":4934487.18,"abc":4950000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-07-31","lat":10.723458,"lon":122.561752,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5238},{"i":6784,"cid":"24JG0014","pid":"P00820394MN","t":"Construction of Flood Control (Rechanneling) Project along Sibuguey River, Purok 5, Barangay Damit, Bayog, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"BAYOG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-10-31","lat":7.806376,"lon":122.998548,"sm":196,"fm":196,"tm":196,"am":196,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.02,"wp":[7.8065,122.99842],"wst":"matched","br":"Damit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5239},{"i":6785,"cid":"22GD0033","pid":"P00620261VS","t":"Construction of Flood Mitigation Facilities along Panay/Mambusao River Basin, Balatucan River Control, Panitan, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"PANITAN (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":62724502.62,"abc":62725000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-12","lat":11.444656,"lon":122.758675,"sm":1093,"fm":1093,"tm":1093,"am":1093,"md":0.0,"ls":"inside","ww":"Mambusao","wn":"Mambusao River","wd":8.64,"wp":[11.40216,122.69221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5240},{"i":6786,"cid":"23G00068","pid":"P00721863VS","t":"Construction of Seawall (Section 8), Iloilo City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"METRO GEAR CONSTRUCTION CORP. / A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-11-25","lat":10.690361,"lon":122.5622,"sm":635,"fm":635,"tm":635,"am":635,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5241},{"i":6787,"cid":"22GF0108","pid":"P00633216VS","t":"Construction of River Control Structure along  Sibalom River, Tigbauan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TIGBAUAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":4940135.94,"abc":4950000.0,"fy":"2022","sd":"05/23/2022","cd":"2022-12-05","lat":10.677446,"lon":122.37402,"sm":1566,"fm":1566,"tm":1566,"am":1566,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.02,"wp":[10.67764,122.37392],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5242},{"i":6788,"cid":"23HO0193","pid":"P00733278VS","t":"Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":67543892.79,"abc":67543921.09,"fy":"2023","sd":"05/05/2023","cd":"2023-10-19","lat":9.773292,"lon":123.368623,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Legaspi","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5243},{"i":6789,"cid":"22GL0031","pid":"P00620243VS","t":"Construction of Binalbagan River Bank Slope Protection (Upstream of Binalbagan Bagacay Bridge) Along Hinigaran-Isabela Rd, Negros Occidental (Phase III, Left Bank)","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"HINIGARAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96499996.46,"abc":96500000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-12-15","lat":10.23383,"lon":122.95023,"sm":622,"fm":622,"tm":null,"am":622,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.234,122.95005],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5244},{"i":6790,"cid":"23JI0052","pid":"P00721659MN","t":"Construction of Flood Control along Sibuguey River, Barangay Villacastor, Buug, Zamboanga Sibugay Package 3","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"BUUG (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"JAYKRIS ENTERPRISES & CONSTRUCTION (FORMERLY: JAYKRIS ENTERPRISES)","c":48898051.48,"abc":49000000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-08-30","lat":7.806289,"lon":122.999414,"sm":269,"fm":269,"tm":269,"am":269,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.09,"wp":[7.80693,122.99893],"wst":"matched","br":"Villacastor","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5245},{"i":6791,"cid":"23HJ0051","pid":"P00721790VS","t":"Construction of Flood Control Structure along Pinocawan River, Barangay Bagawines, Vallehermoso, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALLEHERMOSO (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"02/07/2023","cd":"2023-11-07","lat":10.352908,"lon":123.30745,"sm":1624,"fm":1624,"tm":1624,"am":1624,"md":0.0,"ls":"inside","ww":"Pinocawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagawines","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5246},{"i":6792,"cid":"22FC0169","pid":"P00640470LZ","t":"Construction of Flood Control, Barangay Matanlang (Phase II), Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":49499743.8,"abc":49499743.8,"fy":"2022","sd":"03/31/2022","cd":"2023-05-29","lat":14.14949,"lon":122.761,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matanlang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5247},{"i":6793,"cid":"23G00067","pid":"P00721862VS","t":"Construction of Seawall (Section 7), Iloilo City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"TYER ONE CONSTRUCTION CORPORATION / A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-11-01","lat":10.690239,"lon":122.563544,"sm":635,"fm":635,"tm":635,"am":635,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5248},{"i":6794,"cid":"23HO0044","pid":"P00721518VS","t":"Construction of Revetment Wall along Matutinao River (Leftside), Badian, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96305245.4,"abc":96305247.77,"fy":"2023","sd":"02/08/2023","cd":"2023-12-19","lat":9.808103,"lon":123.368965,"sm":101,"fm":101,"tm":101,"am":101,"md":0.0,"ls":"inside","ww":"Matutinao","wn":"Matutinao River","wd":0.01,"wp":[9.80799,123.36892],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6802],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,320,959.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":780},{"i":6795,"cid":"24GA0021","pid":"P00820148VS","t":"Construction of Revetment Wall along Jal-o River, Sitio Suwaragan, Barangay Calizo, Balete, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BALETE (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":39199936.73,"abc":39200000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-24","lat":11.559353,"lon":122.374942,"sm":129,"fm":129,"tm":129,"am":129,"md":0.0,"ls":"inside","ww":"Jal-o","wn":"Jal-o River","wd":0.01,"wp":[11.55946,122.3749],"wst":"matched","br":"Calizo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5249},{"i":6796,"cid":"23JC0009","pid":"P00732478MN","t":"Construction of Flood Control, Sindangan, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SINDANGAN (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"D' DREAMER DEVELOPMENT CORPORATION","c":4900002.01,"abc":4950000.0,"fy":"2023","sd":"02/14/2023","cd":"2024-03-20","lat":8.216147,"lon":123.078758,"sm":1461,"fm":1461,"tm":1461,"am":1461,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5250},{"i":6797,"cid":"23GL0036","pid":"P00721503VS","t":"Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan (Bagacay) Br. (Right Bank - Phase II), Barangay Rumirang, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"J.F. UY CONSTRUCTION SERVICES / JAIME B. CHING ENTERPRISES","c":78165000.0,"abc":78165000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-15","lat":10.236445,"lon":122.950438,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.19,"wp":[10.23481,122.95087],"wst":"matched","br":"Rumirang","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5251},{"i":6798,"cid":"24HO0070","pid":"P00834585VS","t":"Construction of Revetment Wall along Suba River (Palanas Side), Ginatilan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":57895587.6,"abc":57896087.6,"fy":"2024","sd":"02/16/2024","cd":"2024-06-20","lat":9.551076,"lon":123.310346,"sm":584,"fm":584,"tm":584,"am":1247,"md":0.09,"ls":"boundary","ww":"Suba","wn":"Suba River","wd":0.0,"wp":[9.55104,123.31036],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5252},{"i":6799,"cid":"21JF0100","pid":"P00550477MN","t":"Construction/Improvement of Drainage System, Hashim Street to Funda and Anduhol Street, Ipil, Zamboanga Sibugay","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"Ipil","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"ALBE CONSTRUCTION & ENTERPRISES","c":14816160.07,"abc":14850000.0,"fy":"2021","sd":"04/05/2021","cd":"2023-01-09","lat":7.79194,"lon":122.76164,"sm":647,"fm":null,"tm":647,"am":683,"md":11.42,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.42,"text":"The pin is 11.4 km outside Ipil, Zamboanga Sibugay, the nearest municipality the record claims. It falls in Kabasalan, Zamboanga Sibugay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":302},{"i":6800,"cid":"22GF0002","pid":"P00620090VS","t":"Construction of Siwaragan River Flood Control Project, San Joaquin, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"SAN JOAQUIN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOLDEN ROADRUNNER INTERNATIONAL CORP.","c":19403838.46,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-10-08","lat":10.678068,"lon":122.37576,"sm":1296,"fm":1296,"tm":1296,"am":1566,"md":23.83,"ls":"outside","ww":"Siwaragan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6810],"run":[],"cl":[],"L":"records","s":62,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.83,"text":"The pin is 23.8 km outside San Joaquin, Iloilo, the nearest municipality the record claims. It falls in Tigbauan, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 29,106,913.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":88},{"i":6801,"cid":"23GE0035","pid":"P00721867VS","t":"Construction of Flood Control System in Barangay Igdarapdap, Nueva Valencia, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"NUEVA VALENCIA (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":57610530.48,"abc":57900000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-27","lat":10.436559,"lon":122.563749,"sm":1028,"fm":1028,"tm":1028,"am":1028,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Igdarapdap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5253},{"i":6802,"cid":"23HO0046","pid":"P00721512VS","t":"Construction of Revetment Wall along Matutinao River (Upstream), Badian, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96015713.2,"abc":96015750.57,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":9.808103,"lon":123.368965,"sm":101,"fm":101,"tm":101,"am":101,"md":0.0,"ls":"inside","ww":"Matutinao","wn":"Matutinao River","wd":0.01,"wp":[9.80799,123.36892],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6794],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,320,959.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":781},{"i":6803,"cid":"22GK0174","pid":"P00633000VS","t":"Construction of Flood Control Structure/Drainage System along Guinpana-an Creek, Victorias City, Negors Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY","c":9798000.0,"abc":9799951.95,"fy":"2022","sd":"03/30/2022","cd":"2022-07-09","lat":10.90641,"lon":123.079028,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":"Guinpana-an","wn":"Guinpana-an Creek","wd":0.01,"wp":[10.90643,123.07912],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5254},{"i":6804,"cid":"22FC0166","pid":"P00632959LZ","t":"Construction of Flood Mitigation Structure, Mancruz - Pamorangon Creek, Daet, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"DAET (CAPITAL) (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":4798589.86,"abc":4949365.09,"fy":"2022","sd":"03/22/2022","cd":"2022-07-26","lat":14.101111,"lon":122.950836,"sm":471,"fm":471,"tm":471,"am":471,"md":0.0,"ls":"inside","ww":"Pamorangon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5255},{"i":6805,"cid":"22FE0020","pid":"P00620721LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Sibujo, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"KCS CONSTRUCTION & SUPPLY","c":48018533.15,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.697512,"lon":122.999699,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.69793,122.99962],"wst":"matched","br":"Sibujo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5256},{"i":6806,"cid":"23GO0028","pid":"P00721633VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Gatuslao St., Phase 1, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-27","lat":10.677463,"lon":122.951234,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5257},{"i":6807,"cid":"24FN0004","pid":"P00821393LZ","t":"Construction of Flood Mitigation Structure along Bicol River, Barangay Palsong Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / KENZAI BUILDERS CORPORATION","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-20","lat":13.423583,"lon":123.310561,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.42368,123.31077],"wst":"matched","br":"Palsong Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5258},{"i":6808,"cid":"22FC0042","pid":"P00631391LZ","t":"Construction of Flood Control Structure along Labo River, Barangay Matanlang, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":24499771.08,"abc":24499771.08,"fy":"2022","sd":"03/17/2022","cd":"2023-03-11","lat":14.150136,"lon":122.761803,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":"Labo","wn":"Labo River","wd":2.95,"wp":[14.17636,122.7569],"wst":"matched","br":"Matanlang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5259},{"i":6809,"cid":"23HO0239","pid":"P00745597VS","t":"Repair/ Rehabilitation/ Reconstruction of Damaged Matutinao River Flood Control System (Upstream-Section 2), Badian, Cebu, Sta. 0+000.00 to sta. 0+207.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":81431510.0,"abc":81432079.58,"fy":"2023","sd":"08/10/2023","cd":"2024-05-12","lat":9.812303,"lon":123.36951,"sm":101,"fm":101,"tm":362,"am":101,"md":0.0,"ls":"inside","ww":"Damaged Matutinao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":207.0,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":72.31,"text":"The record contradicts itself: the municipality field and the pin point to Badian, Cebu, but the title names Cebu City, Cebu, 72 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":486},{"i":6810,"cid":"22GF0054","pid":"P00620089VS","t":"Construction of Sibalom River Control Project, Tigbauan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TIGBAUAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":9703074.2,"abc":9800000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-12-26","lat":10.678068,"lon":122.37576,"sm":1566,"fm":1566,"tm":1566,"am":1566,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.02,"wp":[10.6782,122.37572],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6800],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 29,106,913.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":233},{"i":6811,"cid":"24GK0160","pid":"P00834997VS","t":"Construction of Flood Control Structure, Brgy. 21, Victorias City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF VICTORIAS (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":5444992.8,"abc":5444991.75,"fy":"2024","sd":"03/13/2024","cd":"2024-06-01","lat":10.91218,"lon":123.08101,"sm":437,"fm":437,"tm":437,"am":437,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"21","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5260},{"i":6812,"cid":"23JG0056","pid":"P00721606MN","t":"Construction of Flood Control Project, Sibuguey River along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road (S01451MN), Barangay Damit, Bayog, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"BAYOG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":58493426.41,"abc":58800000.0,"fy":"2023","sd":"04/18/2023","cd":"2024-01-22","lat":7.809677,"lon":123.001048,"sm":196,"fm":196,"tm":196,"am":196,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.02,"wp":[7.80952,123.00091],"wst":"matched","br":"Damit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5261},{"i":6813,"cid":"22FE0026","pid":"P00620722LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Tampuhan, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"KCS CONSTRUCTION & SUPPLY","c":48015655.63,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.699142,"lon":123.001592,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.08,"wp":[13.69844,123.00177],"wst":"matched","br":"Tampuhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5262},{"i":6814,"cid":"23F00263","pid":"P00740493LZ","t":"Construction of Flood Control Structure, Brgy. San Nicolas (Phase 3), Talisay, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"TALISAY (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"EUS CONSTRUCTION / VINHAR CONSTRUCTION & MARKETING (FOR. VINHAR CONST","c":96499924.2,"abc":96499924.2,"fy":"2023","sd":"10/06/2023","cd":"2024-06-28","lat":14.144894,"lon":122.951413,"sm":1531,"fm":1531,"tm":1531,"am":1531,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5263},{"i":6815,"cid":"24GG0156","pid":"P00834994VS","t":"Construction of Flood Control Structure along Ulian River, Dueñas, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"DUEÑAS (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"UBS UNITED BUILDERS AND SUPPLY INC.","c":39492437.76,"abc":39600000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-09-01","lat":11.087,"lon":122.564,"sm":531,"fm":531,"tm":531,"am":531,"md":0.0,"ls":"inside","ww":"Ulian","wn":"Ulian River","wd":0.09,"wp":[11.08641,122.56349],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5264},{"i":6816,"cid":"23FC0041","pid":"P00736125LZ","t":"Construction of Flood Control, Calabasa (Phase IV), Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":95479124.82,"abc":96499775.93,"fy":"2023","sd":"07/26/2023","cd":"2024-07-25","lat":14.15273,"lon":122.76367,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5265},{"i":6817,"cid":"22FC0193","pid":"P00631409LZ","t":"Construction of Mercedes River Control, Barangay San Roque, Mercedes, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"MERCEDES (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":42139885.61,"abc":42139885.61,"fy":"2022","sd":"03/16/2022","cd":"2022-09-17","lat":14.106236,"lon":123.001975,"sm":967,"fm":967,"tm":967,"am":967,"md":0.0,"ls":"inside","ww":"Mercedes","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5266},{"i":6818,"cid":"22FO0055","pid":"P00631353LZ","t":"Construction of Catburawan River Flood Control Structure, Barangay Catburawan, Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":48969287.6,"abc":92956675.49,"fy":"2022","sd":"03/22/2022","cd":"2023-03-01","lat":13.02529,"lon":123.31141,"sm":396,"fm":396,"tm":396,"am":1031,"md":0.03,"ls":"boundary","ww":"Catburawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Catburawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5267},{"i":6819,"cid":"24GA0018","pid":"P00820041VS","t":"Rehabilitation of Revetment Wall along Jal-o River, Balete, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"BALETE (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":49062232.76,"abc":49062530.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-24","lat":11.556188,"lon":122.376028,"sm":129,"fm":129,"tm":129,"am":129,"md":0.0,"ls":"inside","ww":"Jal-o","wn":"Jal-o River","wd":0.02,"wp":[11.55632,122.37592],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5268},{"i":6820,"cid":"23HO0014","pid":"P00721520VS","t":"Construction of Revetment Wall at Sitio Luwak - Sitio Kang-Irong, Brgy. Salmeron, Malabuyoc, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":96396397.96,"abc":96396402.16,"fy":"2023","sd":"02/08/2023","cd":"2023-11-17","lat":9.652897,"lon":123.369765,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salmeron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5269},{"i":6821,"cid":"24GK0069","pid":"P00832631VS","t":"Construction of Breakwater, Barangay Tortosa, Municipality of Manapla, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"MANAPLA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":4947977.52,"abc":4949991.62,"fy":"2024","sd":"03/13/2024","cd":"2024-06-02","lat":10.93509,"lon":123.089409,"sm":912,"fm":912,"tm":912,"am":912,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tortosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5270},{"i":6822,"cid":"22GK0093","pid":"P00630638VS","t":"Construction of Flood Mitigation Structure, Silay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SILAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"CANLAON BUILDERS AND DEVELOPMENT CORPORATION","c":10392997.0,"abc":10394999.05,"fy":"2022","sd":"02/08/2022","cd":"2022-07-22","lat":10.849663,"lon":122.951414,"sm":1456,"fm":1456,"tm":1456,"am":1456,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5271},{"i":6823,"cid":"23G00066","pid":"P00721861VS","t":"Construction of Seawall (Section 6), Iloilo City","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-11-04","lat":10.690106,"lon":122.564997,"sm":635,"fm":635,"tm":635,"am":635,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5272},{"i":6824,"cid":"24JD0012","pid":"P00820131MN","t":"Construction of Lanawan CIS Protection Works, Salug, Zamboanga Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"SALUG (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"MIN CONSTRUCTION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-07-04","lat":8.08329,"lon":122.76421,"sm":1243,"fm":1243,"tm":1243,"am":1243,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5273},{"i":6825,"cid":"22GL0094","pid":"P00620441VS","t":"Construction of Binalbagan River Bank Slope Protection (Downstream of Alicante Bridge), Phase II, Left Bank, Along Jct Bagonawa-La Castellana-Isabela Road, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-28","lat":10.2443,"lon":123.0031,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.02,"wp":[10.24412,123.0032],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[6915,6873,6931],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22GL0094 to 22GL0098) cover the same site, together worth PHP 333,600,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":225},{"i":6826,"cid":"24JG0042","pid":"P00821215MN","t":"Construction of Flood Control Structure, Barangay Punta Flecha, Pitogo, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PITOGO (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":14679957.15,"abc":14700000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-04-29","lat":7.40252,"lon":123.369813,"sm":1149,"fm":1149,"tm":1149,"am":1149,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Punta Flecha","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5274},{"i":6827,"cid":"22FC0054","pid":"P00631415LZ","t":"Construction of Seawall, Barangay Colasi, Mercedes, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"MERCEDES (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"BRENTMIN ROOFING ENTERPRISE","c":42139475.15,"abc":42139475.15,"fy":"2022","sd":"03/17/2022","cd":"2022-09-18","lat":13.91785,"lon":123.091176,"sm":967,"fm":967,"tm":967,"am":967,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colasi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5275},{"i":6828,"cid":"22FO0031","pid":"P00631357LZ","t":"Construction of Flood Control/River Dike, Sitio Sabang, Barangay Maonon, Ligao City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"4DOVE BUILDERS CORPORATION","c":29337534.11,"abc":29337534.11,"fy":"2022","sd":"02/17/2022","cd":"2022-07-15","lat":13.03907,"lon":123.3705,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maonon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5276},{"i":6829,"cid":"23FF0032","pid":"P00737568LZ","t":"Construction of Flood Mitigation Structure, Palo, Canaman, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES","c":4895533.0,"abc":4949983.15,"fy":"2023","sd":"03/22/2023","cd":"2023-05-15","lat":13.664791,"lon":123.092267,"sm":317,"fm":317,"tm":317,"am":317,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5277},{"i":6830,"cid":"22FN0065","pid":"P00632971LZ","t":"Rehabilitation of Flood Control Mitigation Structure, Barangay San Roque, Nabua, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"QDC CONSTRUCTION AND SUPPLY","c":4831050.02,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-09-09","lat":13.40679,"lon":123.37134,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5278},{"i":6831,"cid":"23FN0005","pid":"P00736120LZ","t":"Construction of Bank Protection Structure along Bicol River, Palsong-Sto. Domingo Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96314191.85,"abc":96315788.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-07","lat":13.421148,"lon":123.311704,"sm":247,"fm":247,"tm":247,"am":247,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.42129,123.31206],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5279},{"i":6832,"cid":"23HK0060","pid":"P00721841VS","t":"Rehabilitation of Tamogong River Control, Bais City, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BAIS CITY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-09-07","lat":9.58164,"lon":123.09688,"sm":113,"fm":113,"tm":113,"am":113,"md":0.0,"ls":"inside","ww":"Tamogong","wn":"Tamogong River","wd":0.05,"wp":[9.58125,123.0967],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5280},{"i":6833,"cid":"23GJ0033","pid":"P00733729VS","t":"Construction of Drainage System in Lapaz, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"PESOM CONSTRUCTION SERVICES (FORMERLY: PESOM BUILDERS AND CONSTRUCTION SUPPLY)","c":4930000.0,"abc":4950000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-08-27","lat":10.719411,"lon":122.566638,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5281},{"i":6834,"cid":"22FN0082","pid":"P00631435LZ","t":"Construction of River Slope Protection at La Medalla, Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISAM CONSTRUCTION & SUPPLIES","c":29399841.95,"abc":29400000.0,"fy":"2022","sd":"05/26/2022","cd":"2022-12-22","lat":13.4715,"lon":123.3715,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5282},{"i":6835,"cid":"22FE0019","pid":"P00620719LZ","t":"Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Mambayawas, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"NFH CONSTRUCTION & SUPPLY","c":48015489.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-09-20","lat":13.714225,"lon":123.003192,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.71398,123.00357],"wst":"matched","br":"Mambayawas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5283},{"i":6836,"cid":"24GA0020","pid":"P00820147VS","t":"Construction of Revetment Wall along Jal-o River, Sitio Mapait, Barangay Aranas, Balete, Aklan","w":"Construction of Revetment","rg":"Region VI","pv":"AKLAN","mu":"BALETE (AKLAN)","deo":"Aklan District Engineering Office","co":"G.F. ROVERO MERCHANDISING","c":39199794.21,"abc":39200000.0,"fy":"2024","sd":"02/06/2024","cd":"2024-04-24","lat":11.557022,"lon":122.376953,"sm":129,"fm":129,"tm":129,"am":129,"md":0.0,"ls":"inside","ww":"Jal-o","wn":"Jal-o River","wd":0.01,"wp":[11.55706,122.37693],"wst":"matched","br":"Aranas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5284},{"i":6837,"cid":"23GO0021","pid":"P00721626VS","t":"Construction/Rehabilitation/Improvement of Drainage System, B.S. Aquino Drive, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"HUMMING BIRD CONSTRUCTION & SUPPLY CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-12-20","lat":10.685919,"lon":122.951773,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5285},{"i":6838,"cid":"24FC0003","pid":"P00839667LZ","t":"Construction of Box Culvert, Barangay Pinagbirayang Munti, Paracale, Camarines Norte","w":"Construction of Flood Mitigation Facility","rg":"Region V","pv":"CAMARINES NORTE","mu":"PARACALE (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY","c":4948973.07,"abc":4949980.94,"fy":"2024","sd":"02/16/2024","cd":"2024-06-08","lat":14.22074,"lon":122.76438,"sm":1101,"fm":1101,"tm":1101,"am":1101,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinagbirayang Munti","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5286},{"i":6839,"cid":"24GK0072","pid":"P00832636VS","t":"Construction of Drainage System, whole Area of Barangay Zone 5, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"HAFF CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: HAFF CONSTRUCTION AND SUPPLIES)","c":4947977.29,"abc":4949990.89,"fy":"2024","sd":"03/13/2024","cd":"2024-06-04","lat":10.95538,"lon":123.312457,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5287},{"i":6840,"cid":"23FE0013","pid":"P00726292LZ","t":"Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"PAMPLONA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48493174.09,"abc":49000000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-27","lat":13.571699,"lon":123.097291,"sm":1075,"fm":1075,"tm":1075,"am":1075,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Gabriel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5288},{"i":6841,"cid":"20G00090","pid":"P00442501VS","t":"Construction of Slope Protection and Improvement along Iloilo River, Right Bank (from Forbes Bridge to Muelle Loney Bridge (Rizal)), Iloilo City","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":38453540.08,"abc":39600000.0,"fy":"2020","sd":"11/23/2020","cd":"2022-08-10","lat":10.705,"lon":122.568,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":"Iloilo","wn":"Iloilo River","wd":0.09,"wp":[10.70578,122.56764],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5289},{"i":6842,"cid":"23FN0008","pid":"P00736104LZ","t":"Construction of Flood Control along Cagas Bridge (Downstream Section), Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96402424.49,"abc":96402476.0,"fy":"2023","sd":"02/17/2023","cd":"2023-12-22","lat":13.40052,"lon":123.37236,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5290},{"i":6843,"cid":"23FE0065","pid":"P00726955LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Tampuhan, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":70928316.1,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-03-26","lat":13.699459,"lon":123.003574,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.69901,123.00373],"wst":"matched","br":"Tampuhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5291},{"i":6844,"cid":"23J00033","pid":"P00721404MN","t":"Construction of Flood Control Structure (revetment Wall) along Sibuguey River, Barangay Santa Barbara, Imelda, Zamboanga Sibugay","w":"Construction of Revetment","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IMELDA (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 1st District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":96499965.23,"abc":96500000.0,"fy":"2023","sd":"05/22/2023","cd":"2024-01-19","lat":7.65959,"lon":122.95183,"sm":636,"fm":636,"tm":636,"am":636,"md":0.0,"ls":"inside","ww":"Sibuguey","wn":"Sibuguey River","wd":0.04,"wp":[7.65962,122.9515],"wst":"matched","br":"Santa Barbara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5292},{"i":6845,"cid":"24GG0166","pid":"P00820164VS","t":"Construction of Managopaya CIS Slope Protection, Banate, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"BANATE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"MZ BUILDERS & CONSTRUCTION SUPPLY","c":4899987.47,"abc":4900000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-07-12","lat":11.08704,"lon":122.76716,"sm":143,"fm":143,"tm":143,"am":143,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5293},{"i":6846,"cid":"22HO0003","pid":"P00620037VS","t":"Construction of Ginatilan Flood Control (Upstream), Ginatilan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FIRST GRANDEUR BUILDERS","c":48999896.71,"abc":48999896.71,"fy":"2022","sd":"03/23/2022","cd":"2022-11-10","lat":9.571828,"lon":123.314359,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5294},{"i":6847,"cid":"23FE0080","pid":"P00740681LZ","t":"Construction of Flood Control along Creek, Brgy. San Gabriel, Pamplona, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"PAMPLONA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"HONEYVILLECONST AND DEVELOPMENT CORPORATION","c":48997080.61,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-01-06","lat":13.572748,"lon":123.098186,"sm":1075,"fm":1075,"tm":1075,"am":1075,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Gabriel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5295},{"i":6848,"cid":"20G00090","pid":"P00442501VS","t":"Construction of Slope Protection and Improvement along Iloilo River, Right Bank (from Forbes Bridge to Muelle Loney Bridge (Rizal)), Iloilo City","w":"Construction of Revetment","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION)","c":38453540.08,"abc":39600000.0,"fy":"2021","sd":"11/23/2020","cd":"2022-08-10","lat":10.705,"lon":122.568,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":"Iloilo","wn":"Iloilo River","wd":0.09,"wp":[10.70578,122.56764],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5296},{"i":6849,"cid":"22FO0056","pid":"P00631362LZ","t":"Construction of Pinanganuran River Flood Control Structure, Barangay San Jose, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":49000000.0,"abc":98000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-15","lat":13.24576,"lon":123.37249,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":"Pinanganuran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5297},{"i":6850,"cid":"24FE0045","pid":"P00825142LZ","t":"Construction of Flood Mitigation Structure along Libmanan River (Right Side) within Bicol River Basin, Barangay Tampuhan, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":135099448.6,"abc":135100000.0,"fy":"2024","sd":"04/23/2024","cd":"2024-09-25","lat":13.699727,"lon":123.004326,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.69926,123.00449],"wst":"matched","br":"Tampuhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5298},{"i":6851,"cid":"23FC0016","pid":"P00727215LZ","t":"Construction/Rehabilitation of Flood Protection Measures at Brgy. Kabuluan, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":17483692.3,"abc":17639628.18,"fy":"2023","sd":"04/05/2023","cd":"2023-08-02","lat":14.108373,"lon":122.379403,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kabuluan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5299},{"i":6852,"cid":"22GD0065","pid":"P00633214VS","t":"Construction of Drainage System, Barangay Banica, Roxas City, Capiz","w":"Construction of Drainage Structure","rg":"Region VI","pv":"CAPIZ","mu":"ROXAS CITY (CAPITAL) (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"KIRSKAT VENTURE","c":4202711.02,"abc":4950000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-10-22","lat":11.584008,"lon":122.7676,"sm":1225,"fm":1225,"tm":1225,"am":1225,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banica","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5300},{"i":6853,"cid":"22FE0033","pid":"P00620709LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Bical, San Fernando, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN FERNANDO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":48021720.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.481566,"lon":123.099083,"sm":1271,"fm":1271,"tm":1271,"am":1271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bical","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5301},{"i":6854,"cid":"22HJ0036","pid":"P00620140VS","t":"Construction of Flood Control along Malangsa River, Sta. 0+000 - Sta. 1+250 (BS, US), Puan, Vallehermoso, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"VALLEHERMOSO (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION / ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2023-06-25","lat":10.325653,"lon":123.3158,"sm":1624,"fm":1624,"tm":1624,"am":1624,"md":0.0,"ls":"inside","ww":"Malangsa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5302},{"i":6855,"cid":"24GO0020","pid":"P00820307VS","t":"Construction of Revetment with Floodwall in Bakyas Creek, Bacolod City, Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / JVC TOUGH CORE CONSTRUCTION & BUILDERS CORP.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-10-16","lat":10.641007,"lon":122.952122,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Bakyas","wn":"Bakyas Creek","wd":0.01,"wp":[10.64103,122.95207],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5303},{"i":6856,"cid":"21GJ0064","pid":"P00521617VS","t":"Construction/Rehabilitation of Drainage System, City Proper, Section 2, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"CONTE BUILDERS & CONSTRUCTION SUPPLY","c":8448396.05,"abc":9799965.93,"fy":"2021","sd":"02/22/2022","cd":"2022-08-15","lat":10.691956,"lon":122.569129,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5304},{"i":6857,"cid":"22FO0016","pid":"P00631377LZ","t":"Rehabilitation of San Jose Flood Control Structure, San Jose, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":48997251.57,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":13.24573,"lon":123.37277,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5305},{"i":6858,"cid":"24GH0081","pid":"P00820165VS","t":"Construction of Flood Control Structure, Barangay Barrido, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-12-10","lat":11.08894,"lon":123.00444,"sm":14,"fm":14,"tm":14,"am":14,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barrido","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5306},{"i":6859,"cid":"22FC0161","pid":"P00631400LZ","t":"Construction of Flood Control Structure, Brgy. San Vicente, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"N.E.B. CONSTRUCTION AND SUPPLY","c":24499261.95,"abc":24499261.95,"fy":"2022","sd":"03/11/2022","cd":"2022-08-23","lat":14.162953,"lon":122.380017,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5307},{"i":6860,"cid":"23FE0059","pid":"P00726958LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Mambayawas, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":72239845.66,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-31","lat":13.715192,"lon":123.0045,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.04,"wp":[13.71489,123.0047],"wst":"matched","br":"Mambayawas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5308},{"i":6861,"cid":"24HO0016","pid":"P00820070VS","t":"Construction of Revetment Wall at Sitio Luwak, Barangay Salmeron, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":128179667.5,"abc":128180577.7,"fy":"2024","sd":"02/16/2024","cd":"2024-06-18","lat":9.652328,"lon":123.373866,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salmeron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5309},{"i":6862,"cid":"22GD0010","pid":"P00620262VS","t":"Construction of Flood Mitigation Facilities along Panay/Mambusao River Basin, Panitan River Control (Downstream), Panitan, Capiz","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"CAPIZ","mu":"PANITAN (CAPIZ)","deo":"Capiz 1st District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / SALMEGA BUILDERS","c":62724905.03,"abc":62725000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-11-15","lat":11.466336,"lon":122.772456,"sm":1093,"fm":1093,"tm":1093,"am":1093,"md":0.0,"ls":"inside","ww":"Mambusao","wn":"Mambusao River","wd":11.27,"wp":[11.40216,122.69221],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5310},{"i":6863,"cid":"22HJ0100","pid":"P00642567VS","t":"Repair/Rehabilitation/Reconstruction of Flood Control along Alangilanan River (Upstream)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"MANJUYOD (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"MAI CONSTRUCTION & SUPPLY","c":3273333.2,"abc":3273333.2,"fy":"2022","sd":"06/06/2022","cd":"2022-07-06","lat":9.640587,"lon":123.099748,"sm":920,"fm":920,"tm":null,"am":920,"md":0.0,"ls":"inside","ww":"Alangilanan","wn":"Alangilanan River","wd":0.04,"wp":[9.64085,123.10006],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5311},{"i":6864,"cid":"23GO0022","pid":"P00721627VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Lopez Jaena St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"TMTC CONSTRUCTION AND SUPPLY CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-16","lat":10.65973,"lon":122.952152,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5312},{"i":6865,"cid":"23HO0004","pid":"P00721519VS","t":"Construction of Revetment Wall at Sitio Kang-Irong - Sitio Luwak, Brgy. Salmeron, Malabuyoc, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96207155.27,"abc":96207158.11,"fy":"2023","sd":"02/08/2023","cd":"2023-11-24","lat":9.652886,"lon":123.374399,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salmeron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5313},{"i":6866,"cid":"24GO0021","pid":"P00820308VS","t":"Construction of Revetment with Floodwall in Ngalan River, Bacolod City, Negros Occidental","w":"Construction of Revetment","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / JVC TOUGH CORE CONSTRUCTION & BUILDERS CORP.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-10-16","lat":10.66129,"lon":123.00452,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":"Ngalan","wn":"Ngalan River","wd":0.0,"wp":[10.66133,123.0045],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5314},{"i":6867,"cid":"24GK0190","pid":"P00820005VS","t":"Construction of Drainage Structure at Brgy. Maquiling, Brgy. Magsaysay and Brgy Lopez Jaena, Sagay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. / PGO CONSTRUCTION","c":96494917.59,"abc":96499988.22,"fy":"2024","sd":"04/11/2024","cd":"2024-10-15","lat":10.795093,"lon":123.37785,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maquiling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5315},{"i":6868,"cid":"21GJ0002","pid":"P00521613VS","t":"Construction of Slope Protection along Iloilo City Floodway, (Buhang Br. To Radial Br. R/S) Jaro, Iloilo City","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"BOAZ AND JACHIN CONSTRUCTION SUPPLY & SERVICES","c":14132568.92,"abc":15587880.0,"fy":"2021","sd":"04/12/2021","cd":"2022-07-10","lat":10.751128,"lon":122.570357,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":"Iloilo City","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5316},{"i":6869,"cid":"22HO0006","pid":"P00620038VS","t":"Construction of Looc Flood Control, Ginatilan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS","c":29394310.95,"abc":29394311.68,"fy":"2022","sd":"02/10/2022","cd":"2022-08-22","lat":9.599542,"lon":123.31813,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5317},{"i":6870,"cid":"23FC0006","pid":"P00737560LZ","t":"Construction of Flood Mitigation Structure, Tugos ES, Barangay Tugos, Paracale, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"PARACALE (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":9813293.71,"abc":9899936.97,"fy":"2023","sd":"04/05/2023","cd":"2023-09-06","lat":14.27224,"lon":122.78005,"sm":1101,"fm":1101,"tm":1101,"am":1101,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tugos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5318},{"i":6871,"cid":"22GB0016","pid":"P00620296VS","t":"Construction of Flood Control Structure along Sibalom River, Brgy. Sido-Brgy. Cadolonan, Sibalom, Antique","w":"Construction of Revetment","rg":"Region VI","pv":"ANTIQUE","mu":"SIBALOM (ANTIQUE)","deo":"Antique District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC. / SENTINA CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/07/2022","cd":"2023-04-28","lat":10.80739,"lon":122.38813,"sm":1443,"fm":1443,"tm":1443,"am":771,"md":21.19,"ls":"outside","ww":"Sibalom","wn":"Sibalom River","wd":0.09,"wp":[10.80699,122.38742],"wst":"matched","br":"Sido-Brgy. Cadolonan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":21.19,"text":"The pin is 21.2 km outside Sibalom, Antique, the nearest municipality the record claims. It falls in Leon, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":174},{"i":6872,"cid":"23FE0063","pid":"P00726960LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Umalo, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72358567.14,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-03-26","lat":13.679295,"lon":123.102031,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.19,"wp":[13.67878,123.10367],"wst":"matched","br":"Umalo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5319},{"i":6873,"cid":"22GL0097","pid":"P00620442VS","t":"Construction of Binalbagan River Bank Slope Protection (Downstream of Alicante Bridge), Phase II, Right Bank, Along Jct Bagonawa-La Castellana-Isabela Road, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-06","lat":10.24455,"lon":123.00493,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.01,"wp":[10.24459,123.00491],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[6825,6915,6931],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22GL0094 to 22GL0098) cover the same site, together worth PHP 333,600,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":226},{"i":6874,"cid":"23F00234","pid":"P00737371LZ","t":"Construction of Flood Mitigation Structure, Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte Sub-District Engineering Office","co":"128 DRAGON CONSTRUCTION AND SUPPLIES","c":6929997.06,"abc":6929997.06,"fy":"2023","sd":"07/07/2023","cd":"2023-09-15","lat":14.0813,"lon":122.9531,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5320},{"i":6875,"cid":"22FO0056","pid":"P00631363LZ","t":"Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":49000000.0,"abc":98000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-15","lat":13.2551,"lon":123.37847,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":"Pinanganuran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Villa Petrona","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5321},{"i":6876,"cid":"24FN0031","pid":"P00821375LZ","t":"Construction of Bicol River Flood Mitigation Structure, Barangay La Purisima, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP. / MPIRE NINE CONSTRUCTION OPC","c":138477500.0,"abc":138477500.0,"fy":"2024","sd":"03/04/2024","cd":"2024-08-20","lat":13.418004,"lon":123.319097,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.41782,123.31934],"wst":"matched","br":"La Purisima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5322},{"i":6877,"cid":"24GF0030","pid":"P00834993VS","t":"Construction of Sibalom River Control and Revetment, Tigbauan, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TIGBAUAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"RINEL CONSTRUCTION SERVICES","c":29669248.58,"abc":29700000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-10","lat":10.70905,"lon":122.38821,"sm":1566,"fm":1566,"tm":1566,"am":1566,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.13,"wp":[10.70788,122.38817],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5323},{"i":6878,"cid":"22G00061","pid":"P00620266VS","t":"Construction of Flood Mitigation Structure along Ilog-Bungol River (Downstream), Ilog, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ILOG (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"KVC CONSTRUCTION","c":73579995.56,"abc":86850000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-10-20","lat":10.025008,"lon":122.786689,"sm":634,"fm":634,"tm":634,"am":634,"md":0.0,"ls":"inside","ww":"Ilog-Bungol","wn":"Ilog Bungol","wd":2.0,"wp":[10.03798,122.79946],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5324},{"i":6879,"cid":"23FE0018","pid":"P00726604LZ","t":"Construction of Dike along Bicol River, Barangay Cagbibi, Pamplona, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"PAMPLONA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":53047839.5,"abc":53075000.0,"fy":"2023","sd":"03/01/2023","cd":"2024-01-15","lat":13.625538,"lon":123.10348,"sm":1075,"fm":1075,"tm":1075,"am":1075,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":1.06,"wp":[13.62897,123.11261],"wst":"matched","br":"Cagbibi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5325},{"i":6880,"cid":"23GF0073","pid":"P00733299VS","t":"Construction of Flood Control Structure along Sibalom River, Barangay Napnapan Sur, Tigbauan, lloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"TIGBAUAN (ILOILO)","deo":"Iloilo 1st District Engineering Office","co":"GOOD FORTUNE INTERNATIONAL, INC.","c":14679731.63,"abc":14700000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-10-07","lat":10.709954,"lon":122.392595,"sm":1566,"fm":1566,"tm":1566,"am":1566,"md":0.0,"ls":"inside","ww":"Sibalom","wn":"Sibalom River","wd":0.0,"wp":[10.70993,122.39261],"wst":"matched","br":"Napnapan Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5326},{"i":6881,"cid":"23GM0015","pid":"P00721744VS","t":"Construction of Flood Mitigation Structure along Ilog-Bungol River, Ilog, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ILOG (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / M.K.U. CONSTRUCTION AND SUPPLY","c":89262500.0,"abc":89262500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-08-22","lat":10.036013,"lon":122.787388,"sm":634,"fm":634,"tm":634,"am":634,"md":0.0,"ls":"inside","ww":"Ilog-Bungol","wn":"Ilog Bungol","wd":1.25,"wp":[10.04164,122.79726],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5327},{"i":6882,"cid":"21JB0091","pid":"P00522146MN","t":"Construction of Sindangan River Park/Boardwalk, (Barangay Goleo To Barangay Lawis), Sindangan, Zamboanga Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"Sindangan","deo":"Zamboanga del Norte 2nd District Engineering Office","co":"BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE","c":29354536.9,"abc":49000000.0,"fy":"2021","sd":"08/31/2021","cd":"2022-09-22","lat":8.2248,"lon":123.005167,"sm":1461,"fm":null,"tm":1461,"am":1461,"md":0.0,"ls":"inside","ww":"Sindangan","wn":"Sindangan River","wd":0.06,"wp":[8.22436,123.00487],"wst":"matched","br":"Goleo To Barangay Lawis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5328},{"i":6883,"cid":"23GL0079","pid":"P00733733VS","t":"Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Brgy. Aranda (Phase IV, Left Bank), Hinigaran, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"HINIGARAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-05","lat":10.226742,"lon":122.953562,"sm":622,"fm":622,"tm":622,"am":622,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.22646,122.95348],"wst":"matched","br":"Aranda","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5329},{"i":6884,"cid":"24EH0069","pid":"P00820989LZ","t":"Improvement of Cantingas RIS Drainage System, San Fernando, Romblon","w":"Construction of Flood Mitigation Structure","rg":"Region IV-B","pv":"CAMARINES SUR","mu":"SAN FERNANDO (CAMARINES SUR)","deo":"Romblon District Engineering Office","co":"R.G. FLORENTINO CONST. & TRADING INC.","c":19600000.0,"abc":19599999.56,"fy":"2024","sd":"03/19/2024","cd":"2024-11-23","lat":12.3178,"lon":122.5752,"sm":1275,"fm":1271,"tm":1275,"am":1275,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":139.97,"text":"The record contradicts itself: the title and the pin point to San Fernando, Romblon, but the municipality field names San Fernando, Camarines Sur, 140 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":613},{"i":6885,"cid":"23HO0059","pid":"P00721546VS","t":"Construction of Riverbank along Ginatilan Flood Control (Upstream - Left Side) (Phase II), Ginatilan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FIRST GRANDEUR BUILDERS / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":87811664.0,"abc":87813259.66,"fy":"2023","sd":"02/08/2023","cd":"2023-11-26","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[6892,6900,6908,6919,6924,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":160},{"i":6886,"cid":"22F00052","pid":"P00620274LZ","t":"Construction of Barit River Flood Mitigation Structure (Antipolo Young Section), Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":93127727.21,"abc":93127727.21,"fy":"2022","sd":"03/21/2022","cd":"2022-11-30","lat":13.403187,"lon":123.379533,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.40321,123.37944],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5330},{"i":6887,"cid":"23GH0074","pid":"P00733719VS","t":"Construction of Seawall/Storm Surge Protection, Brgy. Poblacion, Concepcion, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"CONCEPCION (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-02-08","lat":11.216384,"lon":123.109527,"sm":449,"fm":449,"tm":449,"am":449,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5331},{"i":6888,"cid":"23FC0030","pid":"P00726289LZ","t":"Construction/Rehabilitation of Flood Protection Measures at Brgy. San Lorenzo, Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"GREAT WALL ENGINEERING","c":14241069.96,"abc":17639927.68,"fy":"2023","sd":"04/05/2023","cd":"2023-08-26","lat":14.21965,"lon":122.39335,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5332},{"i":6889,"cid":"24GM0016","pid":"P00820292VS","t":"Construction of Flood Mitigation Structure along Ilog-Bungol River (Downstream of Approach A of Malabong Br.), Ilog, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ILOG (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"M.K.U. CONSTRUCTION AND SUPPLY","c":110098780.0,"abc":110098780.0,"fy":"2024","sd":"02/12/2024","cd":"2024-05-27","lat":10.03563,"lon":122.78743,"sm":634,"fm":634,"tm":634,"am":634,"md":0.0,"ls":"inside","ww":"Ilog-Bungol","wn":"Ilog Bungol","wd":1.27,"wp":[10.04158,122.7973],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5333},{"i":6890,"cid":"23GH0047","pid":"P00721495VS","t":"Construction of Flood Control Structure, Barangay Barrido, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":86464000.0,"abc":86464000.0,"fy":"2023","sd":"02/17/2023","cd":"2024-03-21","lat":11.091234,"lon":123.007036,"sm":14,"fm":14,"tm":14,"am":14,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barrido","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5334},{"i":6891,"cid":"23GJ0032","pid":"P00733728VS","t":"Construction of Drainage System in Lapuz, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"5'S CONSTRUCTION & SUPPLY","c":4949720.0,"abc":4950000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-07-22","lat":10.705837,"lon":122.576281,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5335},{"i":6892,"cid":"23HO0178","pid":"P00733259VS","t":"Construction of Riverbank Protection at Barangay Poblacion, Ginatilan (Upstream Right Side), Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96495338.63,"abc":96495820.17,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[6885,6900,6908,6919,6924,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":142},{"i":6893,"cid":"23FC0029","pid":"P00737559LZ","t":"Construction of Slope Protection Work, Barangay San Lorenzo, Sta. Elena, Camarines Norte","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY","c":9882322.17,"abc":9899456.63,"fy":"2023","sd":"04/05/2023","cd":"2023-06-15","lat":14.21954,"lon":122.39463,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5336},{"i":6894,"cid":"24HO0094","pid":"P00834589VS","t":"Construction of Revetment Wall at Barangay Salmeron - Barangay Cerdeña, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":57896338.99,"abc":57896859.19,"fy":"2024","sd":"03/18/2024","cd":"2024-08-12","lat":9.665553,"lon":123.383928,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salmeron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5337},{"i":6895,"cid":"23GO0032","pid":"P00721638VS","t":"Construction of Drainage System, Luzuriaga St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"EMR BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: EMR BUILDERS)","c":18617139.31,"abc":19600000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-10-23","lat":10.664301,"lon":122.953595,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5338},{"i":6896,"cid":"22FC0194","pid":"P00640469LZ","t":"Construction of Flood Control, Barangay Bagumbayan - Barangay Poblacion Norte, Paracale, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"PARACALE (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":48001721.62,"abc":49999857.99,"fy":"2022","sd":"03/31/2022","cd":"2022-10-10","lat":14.284451,"lon":122.787459,"sm":1101,"fm":1101,"tm":1101,"am":1101,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5339},{"i":6897,"cid":"23HK0059","pid":"P00721843VS","t":"Rehabilitation of Tanjay River Control, Pamplona Section, Simborio, Pamplona, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"PAMPLONA (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-11-26","lat":9.47228,"lon":123.10988,"sm":1076,"fm":1076,"tm":1076,"am":1076,"md":0.0,"ls":"inside","ww":"Tanjay","wn":"Tanjay River","wd":0.04,"wp":[9.47248,123.10962],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6904],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":653},{"i":6898,"cid":"22GH0066","pid":"P00620093VS","t":"Construction of Flood Control Structure, Brgy. Barrido, Ajuy, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"AJUY (ILOILO)","deo":"Iloilo 3rd District Engineering Office","co":"ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC.","c":39197764.65,"abc":39200000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-03-20","lat":11.092083,"lon":123.007233,"sm":14,"fm":14,"tm":14,"am":14,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barrido","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5340},{"i":6899,"cid":"22GG0094","pid":"P00620430VS","t":"Construction of Flood Control/Slope Protection along Suage River in Mina, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MINA (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":28679261.91,"abc":30323160.0,"fy":"2022","sd":"03/29/2022","cd":"2023-11-30","lat":10.93161,"lon":122.576508,"sm":976,"fm":976,"tm":635,"am":976,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.06,"wp":[10.93211,122.5765],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6907],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":16.45,"text":"The record contradicts itself: the municipality field and the pin point to Mina, Iloilo, but the title names Iloilo City, Iloilo, 16 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,078,897.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":336},{"i":6900,"cid":"23HO0187","pid":"P00733273VS","t":"Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Brgy. Poblacion, Ginatilan, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493891.72,"abc":96493927.94,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Package 1","dup":[6885,6892,6908,6919,6924,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":143},{"i":6901,"cid":"23FC0067","pid":"P00727216LZ","t":"Construction of Flood Mitigation Structures, Barangay San Lorenzo, Santa Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY","c":19573649.78,"abc":19599626.9,"fy":"2023","sd":"04/05/2023","cd":"2023-09-10","lat":14.22008,"lon":122.39632,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5341},{"i":6902,"cid":"23GO0029","pid":"P00721634VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Gatuslao St., Phase 2, Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/08/2023","cd":"2024-01-11","lat":10.684215,"lon":122.953857,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5342},{"i":6903,"cid":"22GG0116","pid":"P00620432VS","t":"Construction of Flood Control/Slope Protection, Sitio Lamintao, Brgy. Talisay, Barotac Nuevo, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BAROTAC NUEVO (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"MZ BUILDERS & CONSTRUCTION SUPPLY","c":19110082.98,"abc":19600000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-07-15","lat":10.900072,"lon":122.788225,"sm":168,"fm":168,"tm":168,"am":168,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talisay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5343},{"i":6904,"cid":"23HK0090","pid":"P00721952VS","t":"Flood Management Program - Rehabilitation of Tanjay River Control, Pamplona Section, Simborio, Pamplona, Negros Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"PAMPLONA (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-10-24","lat":9.47228,"lon":123.10988,"sm":1076,"fm":1076,"tm":1076,"am":1076,"md":0.0,"ls":"inside","ww":"Tanjay","wn":"Tanjay River","wd":0.04,"wp":[9.47248,123.10962],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6897],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 98,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":654},{"i":6905,"cid":"22GM0006","pid":"P00620267VS","t":"Construction of Flood Mitigation Structure along Ilog-Bungol River, Ilog, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ILOG (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / M.K.U. CONSTRUCTION AND SUPPLY","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-04-03","lat":10.03333,"lon":122.78914,"sm":634,"fm":634,"tm":634,"am":634,"md":0.0,"ls":"inside","ww":"Ilog-Bungol","wn":"Ilog Bungol","wd":1.24,"wp":[10.03809,122.79939],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5344},{"i":6906,"cid":"23FE0075","pid":"P00742191LZ","t":"Construction of Mambalite River Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":52469933.27,"abc":52470000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-12-26","lat":13.705504,"lon":123.008099,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Mambalite","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mambalite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5345},{"i":6907,"cid":"22GG0145","pid":"P00633208VS","t":"Construction of Flood Control Structure, Suage River, Mina, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"MINA (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"TIBIAO-ANTIQUE N.K. ENTERPRISE, INC.","c":59399635.55,"abc":59400000.0,"fy":"2022","sd":"05/23/2022","cd":"2024-09-01","lat":10.93161,"lon":122.576508,"sm":976,"fm":976,"tm":976,"am":976,"md":0.0,"ls":"inside","ww":"Suage","wn":"Suage River","wd":0.06,"wp":[10.93211,122.5765],"wst":"matched","br":null,"len":null,"ph":null,"dup":[6899],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 88,078,897.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":853},{"i":6908,"cid":"23HO0188","pid":"P00733274VS","t":"Construcion of Storm Surge Protection Structures at Sitio Kalubihan, Brgy. Guiwanon, Ginatilan, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493883.95,"abc":96493921.75,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guiwanon","len":null,"ph":"Package 1","dup":[6885,6892,6900,6919,6924,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":144},{"i":6909,"cid":"21GJ0074","pid":"P00521614VS","t":"Construction/Rehabilitation of Drainage System, La Paz, Section 2, Iloilo City","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"5'S CONSTRUCTION & SUPPLY","c":8075088.61,"abc":9750144.89,"fy":"2021","sd":"02/22/2022","cd":"2022-07-08","lat":10.728374,"lon":122.579512,"sm":635,"fm":null,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5346},{"i":6910,"cid":"23GO0025","pid":"P00721630VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Rizal St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"RISM BUILDERS AND CONSTRUCTION SERVICES, INC. (FORMERLY RISM DESIGNER'S & GEN. MDSE. & ENG'G.)","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"02/08/2023","cd":"2023-08-26","lat":10.665655,"lon":122.953873,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5347},{"i":6911,"cid":"22FF0049","pid":"P00621520LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Barobaybay (Barobaybay Section - Left Side), Magarao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"MAGARAO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PRECIOUS CONSTRUCTION","c":67323312.63,"abc":67323491.64,"fy":"2022","sd":"05/24/2022","cd":"2023-03-03","lat":13.666706,"lon":123.110548,"sm":864,"fm":864,"tm":864,"am":864,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.07,"wp":[13.66673,123.11117],"wst":"matched","br":"Barobaybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5348},{"i":6912,"cid":"21F00032","pid":"P00526342LZ","t":"Construction/Improvement of Ragay River Flood Mitigation Structures, Ragay, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"Ragay","deo":"Camarines Sur 1st District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":54298479.89,"abc":54299077.17,"fy":"2021","sd":"08/10/2021","cd":"2022-08-05","lat":13.81731,"lon":122.7902,"sm":1196,"fm":null,"tm":1196,"am":1196,"md":0.0,"ls":"inside","ww":"Ragay","wn":"Ragay River","wd":0.03,"wp":[13.81709,122.79014],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5349},{"i":6913,"cid":"21FI0037","pid":"P00561848LZ","t":"Construction of Flood Control System, Brgy. Bangon, Aroroy, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"Aroroy","deo":"Masbate 2nd District Engineering Office","co":"VAEMAR CONSTRUCTION AND SUPPLY","c":24749955.63,"abc":24749955.63,"fy":"2021","sd":"03/01/2022","cd":"2022-10-08","lat":12.493168,"lon":123.384916,"sm":75,"fm":null,"tm":75,"am":75,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5350},{"i":6914,"cid":"23FC0040","pid":"P00736124LZ","t":"Construction of Flood Control Structure, Brgy. Rizal - Brgy. San Lorenzo (Phase III), Sta. Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION","c":95553815.6,"abc":96499762.64,"fy":"2023","sd":"04/05/2023","cd":"2023-11-16","lat":14.21373,"lon":122.39793,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5351},{"i":6915,"cid":"22GL0095","pid":"P00620443VS","t":"Construction of Binalbagan River Bank Slope Protection (Upstream of Alicante Bridge), Phase II, Right Bank, Along Jct Bagonawa-La Castellana-Isabela Road, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"05/19/2022","cd":"2023-03-20","lat":10.24552,"lon":123.00812,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.02,"wp":[10.24538,123.00801],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[6825,6873,6931],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22GL0094 to 22GL0098) cover the same site, together worth PHP 333,600,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":227},{"i":6916,"cid":"23GO0026","pid":"P00721631VS","t":"Construction/Rehabilitation/Improvement of Drainage System, Hilado St., Bacolod City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"BACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL)","deo":"Bacolod City District Engineering Office","co":"ROCK-WILLIAN CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-09-20","lat":10.666668,"lon":122.953951,"sm":95,"fm":95,"tm":95,"am":95,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5352},{"i":6917,"cid":"21GG0024","pid":"P00521609VS","t":"Construction of Flood Control/Slope Protection along Suage River in Mina, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo 2nd District Engineering Office","co":"STELLAR BUILDERS","c":29009563.52,"abc":29400000.0,"fy":"2021","sd":"10/08/2021","cd":"2022-10-17","lat":10.934138,"lon":122.580059,"sm":635,"fm":null,"tm":635,"am":976,"md":16.76,"ls":"outside","ww":"Suage","wn":"Suage River","wd":0.04,"wp":[10.93443,122.57984],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.91,"value":16.76,"text":"The pin is 16.8 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Mina, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":234},{"i":6918,"cid":"22FN0063","pid":"P00631434LZ","t":"Construction of River Slope Protection at Igamot Creek, Upstream and Downstream of Steel Bridge, Barangay Salvacion, Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISAM CONSTRUCTION & SUPPLIES","c":47285146.43,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-03","lat":13.464778,"lon":123.385672,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":"Igamot","wn":"Igamot Creek","wd":2.32,"wp":[13.45492,123.36679],"wst":"matched","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5353},{"i":6919,"cid":"23HO0189","pid":"P00733275VS","t":"Construction of Storm Surge Protection Structures at Sitio Kasay, Brgy. Looc, Ginatilan, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493927.25,"abc":96493927.35,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":null,"ph":"Package 1","dup":[6885,6892,6900,6908,6924,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":145},{"i":6920,"cid":"22GL0037","pid":"P00620241VS","t":"Construction of Binalbagan River Bank Slope Protection (Upstream of Alicante Bridge) Along Jct. Bagonawa-La Castellana-Isabela Road, Negros Occidental (Phase II, Left Bank)","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":72730969.68,"abc":72733980.0,"fy":"2022","sd":"02/17/2022","cd":"2022-09-28","lat":10.24562,"lon":123.00818,"sm":651,"fm":651,"tm":null,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.03,"wp":[10.24538,123.00801],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5354},{"i":6921,"cid":"24F00187","pid":"P00820471LZ","t":"Construction of Flood Mitigation Structure along Minasag River, Barangay San Lorenzo and Barangay Rizal, Santa Elena, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"SANTA ELENA (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":154399195.2,"abc":154399220.3,"fy":"2024","sd":"04/08/2024","cd":"2024-11-30","lat":14.211221,"lon":122.399571,"sm":1381,"fm":1381,"tm":1381,"am":1381,"md":0.0,"ls":"inside","ww":"Minasag","wn":"Minasag River","wd":0.01,"wp":[14.21128,122.39961],"wst":"matched","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5355},{"i":6922,"cid":"22GJ0026","pid":"P00630629VS","t":"Construction of Drainage System, Jaro, Iloilo City, Iloilo","w":"Construction of Drainage Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo City District Engineering Office","co":"BOAZ AND JACHIN CONSTRUCTION SUPPLY & SERVICES","c":4353155.8,"abc":4900000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-11-25","lat":10.755786,"lon":122.585792,"sm":635,"fm":635,"tm":635,"am":635,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5356},{"i":6923,"cid":"22F00043","pid":"P00620326LZ","t":"Rehabilitation of Bicol River Flood Control Structure (Fundado Section), Barangay Fundado, Canaman, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / ASCON CONSTRUCTION AND SUPPLY","c":144640011.9,"abc":144640011.9,"fy":"2022","sd":"04/08/2022","cd":"2023-03-26","lat":13.669116,"lon":123.111683,"sm":317,"fm":317,"tm":317,"am":864,"md":0.5,"ls":"boundary","ww":"Bicol","wn":"Bicol River","wd":0.07,"wp":[13.66909,123.11107],"wst":"matched","br":"Fundado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5357},{"i":6924,"cid":"23HO0192","pid":"P00733276VS","t":"Construction of Storm Surge Protection Strucures at Sitio Balhaan, Brgy. Looc, Ginatilan, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":91668851.52,"abc":91668879.47,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":null,"ph":"Package 1","dup":[6885,6892,6900,6908,6919,6938,6944,6953,6962],"run":[],"cl":[],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":161},{"i":6925,"cid":"23GM0012","pid":"P00721741VS","t":"Construction of Flood Mitigation Structure along Ilog-Hilabangan River (Upstream of Approach A of Ilog Br.) Phase 1, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / M.K.U. CONSTRUCTION AND SUPPLY","c":89262500.0,"abc":89262500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-09-19","lat":10.000086,"lon":122.796786,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Ilog-Hilabangan","wn":"Hilabangan River","wd":5.37,"wp":[9.95731,122.81992],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.37,"text":"The title names Ilog-Hilabangan, which OpenStreetMap maps through the stated municipality, but the pin is 5.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":290},{"i":6926,"cid":"22FC0152","pid":"P00630976LZ","t":"Construction of Flood Mitigation Structure along Malagonot River, Hinampacan Section, Basud, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"BASUD (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"EUS CONSTRUCTION / BRENTMIN ROOFING ENTERPRISE","c":96499449.21,"abc":96499449.21,"fy":"2022","sd":"03/18/2022","cd":"2022-07-25","lat":14.078561,"lon":123.008181,"sm":177,"fm":177,"tm":177,"am":177,"md":0.0,"ls":"inside","ww":"Malagonot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5358},{"i":6927,"cid":"24GA0135","pid":"P00821040VS","t":"Rehabilitation of Seawall, Brgy. Tambak,  New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"GREENLAND BUILDERS","c":29399995.16,"abc":29400000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-08-14","lat":11.658299,"lon":122.426677,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5359},{"i":6928,"cid":"23FN0049","pid":"P00727327LZ","t":"Construction of Flood Mitigation Structure along Barit River (Upstream), Right Side Phase II, Brgy. Antipolo Young, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":77128501.17,"abc":77129566.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-19","lat":13.4008,"lon":123.38596,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.40079,123.38589],"wst":"matched","br":"Antipolo Young","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5360},{"i":6929,"cid":"22HK0043","pid":"P00620048VS","t":"Reconstruction of Tamogong River Control, Bais City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"BAIS CITY (NEGROS ORIENTAL)","deo":"Negros Oriental 2nd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-07","lat":9.98333,"lon":123.1123,"sm":113,"fm":113,"tm":113,"am":668,"md":33.58,"ls":"outside","ww":"Tamogong","wn":"Tamogong River","wd":41.89,"wp":[9.6053,123.13723],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":75,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.58,"text":"The pin is 33.6 km outside Bais City, Negros Oriental, the nearest municipality the record claims. It falls in Jimalalud, Negros Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.89,"value":41.89,"text":"The title names Tamogong, which OpenStreetMap maps through the stated municipality, but the pin is 41.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":33},{"i":6930,"cid":"23GM0014","pid":"P00721742VS","t":"Construction of Flood Mitigation Structure along Ilog-Hilabangan River (Upstream of Approach B of Ilog Br.) Phase 1, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES / ESJ AND SONS CONSTRUCTION & CONSTRUCTION SUPPLY, INC. (FORM.:ALFIE'S CONST. &CONST. SUPPLY, INC.)","c":89262500.0,"abc":89262500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-08-22","lat":10.008627,"lon":122.797536,"sm":391,"fm":391,"tm":391,"am":634,"md":0.32,"ls":"boundary","ww":"Ilog-Hilabangan","wn":"Hilabangan River","wd":6.18,"wp":[9.95902,122.82347],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.61,"value":6.18,"text":"The title names Ilog-Hilabangan, which OpenStreetMap maps through the stated municipality, but the pin is 6.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":280},{"i":6931,"cid":"22GL0098","pid":"P00630207VS","t":"Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Br. Right Bank, Phase II, Isabela, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"ISABELA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":44100000.0,"abc":44100000.0,"fy":"2022","sd":"05/19/2022","cd":"2022-11-22","lat":10.22778,"lon":122.95397,"sm":651,"fm":651,"tm":651,"am":651,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.02,"wp":[10.22767,122.95382],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[6825,6915,6873],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22GL0094 to 22GL0098) cover the same site, together worth PHP 333,600,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":590},{"i":6932,"cid":"23G00020","pid":"P00731612VS","t":"Construction of Slope Protection Structure (Rockfall Netting) along Panay East-West Lateral Road Package 3, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":142337500.0,"abc":142337500.0,"fy":"2023","sd":"02/07/2023","cd":"2024-03-20","lat":11.077475,"lon":122.427339,"sm":635,"fm":635,"tm":635,"am":743,"md":35.9,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":35.9,"text":"The pin is 35.9 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Lambunao, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":76},{"i":6933,"cid":"23FE0056","pid":"P00726956LZ","t":"Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":72374796.65,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-25","lat":13.704778,"lon":123.008481,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.70453,123.00804],"wst":"matched","br":"Mambalite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5361},{"i":6934,"cid":"23GE0018","pid":"P00721643VS","t":"Construction of Flood Mitigation Structure along Jordan River, Barangay Rizal, Jordan, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"JORDAN (CAPITAL) (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48921423.56,"abc":49000000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-03","lat":10.663721,"lon":122.587808,"sm":674,"fm":674,"tm":674,"am":674,"md":0.0,"ls":"inside","ww":"Jordan","wn":"Jordan River","wd":0.01,"wp":[10.66377,122.58791],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5362},{"i":6935,"cid":"23FI0003","pid":"P00726300LZ","t":"Construction of Flood Control System along Bangon River, Sta. 0+217.00 - Sta. 0+307.00 (Upstream, Right Side), Sta. 0+244.00 - Sta. 0+307.00 (Upstream, Left Side), Aroroy, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"AROROY (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"RED DIAMOND CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: RED DIAMOND CONSTRUCTION)","c":24500000.0,"abc":24499976.73,"fy":"2023","sd":"05/19/2023","cd":"2023-08-09","lat":12.493589,"lon":123.385996,"sm":75,"fm":75,"tm":75,"am":75,"md":0.0,"ls":"inside","ww":"Bangon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":153.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5363},{"i":6936,"cid":"22F00044","pid":"P00620327LZ","t":"Rehabilitation of Bicol River Flood Control Structure (Iquin Section), Barangay Iquin, Canaman, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":144514022.5,"abc":144514022.5,"fy":"2022","sd":"04/08/2022","cd":"2023-06-25","lat":13.626047,"lon":123.113272,"sm":317,"fm":317,"tm":317,"am":317,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.05,"wp":[13.62621,123.1137],"wst":"matched","br":"Iquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5364},{"i":6937,"cid":"22GM0007","pid":"P00620269VS","t":"Construction of Flood Mitigation Structure along Sipalay River, Sipalay City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF SIPALAY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":52834715.0,"abc":52834715.0,"fy":"2022","sd":"03/14/2022","cd":"2022-11-21","lat":9.75195,"lon":122.42753,"sm":421,"fm":421,"tm":421,"am":421,"md":0.0,"ls":"inside","ww":"Sipalay","wn":"Sipalay","wd":0.03,"wp":[9.75205,122.42781],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5365},{"i":6938,"cid":"23HO0194","pid":"P00733304VS","t":"Construction of Storm Surge Protection Structures at Sitio Lutak, Brgy. Guiwanon, Ginatilan, Cebu (Package 1)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48993826.58,"abc":48993856.08,"fy":"2023","sd":"04/11/2023","cd":"2023-11-13","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guiwanon","len":null,"ph":"Package 1","dup":[6885,6892,6900,6908,6919,6924,6944,6953,6962],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":369},{"i":6939,"cid":"23HO0238","pid":"P00745603VS","t":"Repair/ Rehabilitation/ Reconstruction of Valencia River Flood Control System (Downstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+226.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":88641056.04,"abc":88641817.5,"fy":"2023","sd":"08/10/2023","cd":"2023-12-18","lat":9.85062,"lon":123.386185,"sm":29,"fm":29,"tm":362,"am":101,"md":6.05,"ls":"outside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":226.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":6.05,"text":"The pin is 6.0 km outside Alegria, Cebu, the nearest municipality the record claims. It falls in Badian, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":201},{"i":6940,"cid":"22FE0031","pid":"P00620711LZ","t":"Construction of Dike (Seawall) along the Shoreline, Brgy. Gñaran, San Fernando, Camarines Sur","w":"Construction of Dike","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN FERNANDO (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":48017728.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-09-14","lat":13.475303,"lon":123.115042,"sm":1271,"fm":1271,"tm":1271,"am":1271,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gñaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5366},{"i":6941,"cid":"22GM0021","pid":"P00620268VS","t":"Construction of Flood Mitigation Structure along Ilog-Hilabangan River, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / M.K.U. CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-06-05","lat":9.99546,"lon":122.79804,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Ilog-Hilabangan","wn":"Hilabangan River","wd":4.85,"wp":[9.95731,122.81992],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":4.85,"text":"The title names Ilog-Hilabangan, which OpenStreetMap maps through the stated municipality, but the pin is 4.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":263},{"i":6942,"cid":"23GL0094","pid":"P00733230VS","t":"Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Barangay Aranda, (Phase V, Left Bank), Hinigaran, Negros Occidental","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"HINIGARAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / BCV CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/01/2023","cd":"2024-02-07","lat":10.226866,"lon":122.953988,"sm":622,"fm":622,"tm":622,"am":622,"md":0.0,"ls":"inside","ww":"Binalbagan","wn":"Binalbagan River","wd":0.04,"wp":[10.22709,122.95428],"wst":"matched","br":"Aranda","len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5367},{"i":6943,"cid":"23FE0014","pid":"P00736128LZ","t":"Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"LIBMANAN (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":67461008.26,"abc":67550000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-12-18","lat":13.704044,"lon":123.008744,"sm":781,"fm":781,"tm":781,"am":781,"md":0.0,"ls":"inside","ww":"Libmanan","wn":"Libmanan River","wd":0.05,"wp":[13.70392,123.0083],"wst":"matched","br":"Mambalite","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5368},{"i":6944,"cid":"23HO0199","pid":"P00733260VS","t":"Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Barangay Poblacion, Ginatilan, Cebu (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493919.26,"abc":96493926.94,"fy":"2023","sd":"04/11/2023","cd":"2023-09-25","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Package 2","dup":[6885,6892,6900,6908,6919,6924,6938,6953,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":146},{"i":6945,"cid":"22JG0057","pid":"P00630568MN","t":"Construction of Diplo River Control, Kumalarang, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"KUMALARANG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 2nd District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":31820034.82,"abc":49000000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-05-29","lat":7.78177,"lon":123.11699,"sm":716,"fm":716,"tm":716,"am":716,"md":0.0,"ls":"inside","ww":"Diplo","wn":"Dipolo River","wd":0.0,"wp":[7.78177,123.11698],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5369},{"i":6946,"cid":"24GQ0028","pid":"P00820013VS","t":"Construction of Flood Control Structures of Higalaman River (Upstream) along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"RKVT CONSTRUCTION / WILKINSON CONSTRUCTION","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-12-05","lat":10.4675,"lon":123.38722,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Higalaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5370},{"i":6947,"cid":"23G00019","pid":"P00731611VS","t":"Construction of Slope Protection Structure (Rockfall Netting) along Panay East-West Lateral Road Package 2, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":142337500.0,"abc":142337500.0,"fy":"2023","sd":"02/07/2023","cd":"2024-03-20","lat":11.077922,"lon":122.427972,"sm":635,"fm":635,"tm":635,"am":743,"md":35.92,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":35.92,"text":"The pin is 35.9 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Lambunao, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":77},{"i":6948,"cid":"23GE0029","pid":"P00721491VS","t":"Construction of River Control Dike with Esplanade (Phase III), Barangay Poblacion, Jordan, Guimaras","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"GUIMARAS","mu":"JORDAN (CAPITAL) (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. / S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":72374214.1,"abc":72375000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-10","lat":10.661999,"lon":122.58969,"sm":674,"fm":674,"tm":674,"am":674,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5371},{"i":6949,"cid":"23FF0044","pid":"P00726611LZ","t":"Rehabilitation of Bicol River Flood Control (Mangayawan Section), Barangay Mangayawan, Canaman, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"417 LP CONSTRUCTION CORPORATION / STEVEN CONSTRUCTION & SUPPLY","c":123941697.7,"abc":125282575.1,"fy":"2023","sd":"05/03/2023","cd":"2023-12-13","lat":13.62024,"lon":123.11758,"sm":317,"fm":317,"tm":317,"am":317,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.62001,123.1173],"wst":"matched","br":"Mangayawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5372},{"i":6950,"cid":"24GM0017","pid":"P00820293VS","t":"Construction of Flood Mitigation Structure along Ilog-Hilabangan River (Upstream of Approach A of Ilog Br.) Phase 2, Kabankalan City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CITY OF KABANKALAN (NEGROS OCCIDENTAL)","deo":"Negros Occidental 3rd District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":125450000.0,"abc":125450000.0,"fy":"2024","sd":"02/22/2024","cd":"2025-01-23","lat":9.99967,"lon":122.79926,"sm":391,"fm":391,"tm":391,"am":391,"md":0.0,"ls":"inside","ww":"Ilog-Hilabangan","wn":"Hilabangan River","wd":5.2,"wp":[9.95731,122.81992],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.59,"value":5.2,"text":"The title names Ilog-Hilabangan, which OpenStreetMap maps through the stated municipality, but the pin is 5.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":251},{"i":6951,"cid":"22FF0050","pid":"P00621521LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Mangayawan (Mangayawan Section - Left Side), Canaman, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CANAMAN (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"417 LP CONSTRUCTION CORPORATION / STEVEN CONSTRUCTION & SUPPLY","c":77199308.02,"abc":77199869.2,"fy":"2022","sd":"04/01/2022","cd":"2023-04-11","lat":13.61815,"lon":123.11836,"sm":317,"fm":317,"tm":317,"am":317,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.05,"wp":[13.61849,123.11873],"wst":"matched","br":"Mangayawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5373},{"i":6952,"cid":"24DM0078","pid":"P00820292LZ","t":"Construction of Flood Control Structure along Busokbusokan River, Barangay San Vicente, San Narciso, Quezon, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region IV-A","pv":"QUEZON","mu":"SAN NARCISO (QUEZON)","deo":"Quezon 3rd District Engineering Office","co":"VFL BUILDERS / WAWAO BUILDERS","c":96500000.0,"abc":96499982.76,"fy":"2024","sd":"02/14/2024","cd":"2024-09-19","lat":13.47279,"lon":122.5897,"sm":1339,"fm":1339,"tm":1188,"am":1339,"md":0.0,"ls":"inside","ww":"Busokbusokan","wn":"Busokbusokan River","wd":0.01,"wp":[13.47278,122.58957],"wst":"matched","br":"San Vicente","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":73.25,"text":"The record contradicts itself: the municipality field and the pin point to San Narciso, Quezon, but the title names Quezon, Quezon, 73 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":442},{"i":6953,"cid":"23HO0200","pid":"P00733261VS","t":"Construction of Storm Surge Protection Structures at Sitio Kalubihan, Barangay Guiwanon, Ginatilan, Cebu (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493901.55,"abc":96493921.52,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guiwanon","len":null,"ph":"Package 2","dup":[6885,6892,6900,6908,6919,6924,6938,6944,6962],"run":[],"cl":[],"L":"field","s":45,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":147},{"i":6954,"cid":"23GQ0045","pid":"P00721872VS","t":"Construction of Flood Control Structure of Andoon River (L/S Downstream), Medina, Brgy. Rizal, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":38600000.0,"abc":38600000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-02","lat":10.49511,"lon":123.38726,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Andoon","wn":"Ando-on River","wd":0.0,"wp":[10.49507,123.38724],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5374},{"i":6955,"cid":"22GK0001","pid":"P00620096VS","t":"Construction of Flood Control at Dapdap River along Bacolod North Rd, Manapla, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"MANAPLA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY / GKMM CONSTRUCTION & SUPPLIES, INC. (FORMERLY: GKMM CONSTRUCTION & SUPPLIES)","c":44097985.0,"abc":44099994.25,"fy":"2022","sd":"02/08/2022","cd":"2022-08-30","lat":10.941111,"lon":123.122778,"sm":912,"fm":912,"tm":912,"am":912,"md":0.0,"ls":"inside","ww":"Dapdap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5375},{"i":6956,"cid":"23FC0005","pid":"P00737561LZ","t":"Construction of Flood Mitigation Structure, P-1, Barangay Mahawan Hawan, Labo, Camarines Norte","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES NORTE","mu":"LABO (CAMARINES NORTE)","deo":"Camarines Norte District Engineering Office","co":"GOLDEN CONSTRUCTION AND SUPPLY","c":4300548.63,"abc":4949218.45,"fy":"2023","sd":"04/05/2023","cd":"2023-08-09","lat":14.19973,"lon":122.79957,"sm":729,"fm":729,"tm":729,"am":729,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahawan Hawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5376},{"i":6957,"cid":"23G00018","pid":"P00731610VS","t":"Construction of Slope Protection Structure (Rockfall Netting) along Panay East-West Lateral Road Package 1, Iloilo","w":"Construction of Slope Protection Structure","rg":"Region VI","pv":"ILOILO","mu":"ILOILO CITY (CAPITAL) (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":142337500.0,"abc":142337500.0,"fy":"2023","sd":"02/07/2023","cd":"2024-03-20","lat":11.078217,"lon":122.428567,"sm":635,"fm":635,"tm":635,"am":743,"md":35.92,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":35.92,"text":"The pin is 35.9 km outside Iloilo City, Iloilo, the nearest municipality the record claims. It falls in Lambunao, Iloilo.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":78},{"i":6958,"cid":"22FF0042","pid":"P00621522LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Punta Tarawal (Punta Tarawal Section - Left Side), Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PEU CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":67549873.69,"abc":67549896.9,"fy":"2022","sd":"04/06/2022","cd":"2022-12-05","lat":13.724677,"lon":123.12451,"sm":291,"fm":291,"tm":291,"am":291,"md":0.01,"ls":"boundary","ww":"Bicol","wn":"Bicol River","wd":0.27,"wp":[13.72315,123.12258],"wst":"matched","br":"Punta Tarawal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5377},{"i":6959,"cid":"23HL0066","pid":"P00722002VS","t":"Construction of Bayawan River Control, Upstream, Bayawan City, Negros Oriental, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/19/2023","cd":"2023-12-15","lat":9.36917,"lon":122.80111,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Bayawan","wn":"Bayawan River","wd":0.06,"wp":[9.36881,122.8015],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5378},{"i":6960,"cid":"23GQ0023","pid":"P00721507VS","t":"Construction of Flood Control Structure of Higalaman River (Downstream) along Bacolod North Rd, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":91674989.91,"abc":91674990.57,"fy":"2023","sd":"03/02/2023","cd":"2023-12-24","lat":10.46752,"lon":123.38754,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Higalaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5379},{"i":6961,"cid":"22JF0009","pid":"P00620261MN","t":"Construction of Flood Control Structure along Sanito River (Phase III), Brgy. Sanito, Ipil, Zamboanga Sibugay","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"IPIL (CAPITAL) (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"LAKEWOOD CONSTRUCTION COMPANY","c":39049908.32,"abc":39200000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-17","lat":7.785161,"lon":122.590589,"sm":647,"fm":647,"tm":647,"am":647,"md":0.0,"ls":"inside","ww":"Sanito","wn":"Sanito River","wd":0.02,"wp":[7.78527,122.59071],"wst":"matched","br":"Sanito","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5380},{"i":6962,"cid":"23HO0203","pid":"P00733303VS","t":"Construction of Storm Surge Protection Structures at Sitio Kasay, Barangay Looc, Ginatilan, Cebu (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48993817.63,"abc":48993836.6,"fy":"2023","sd":"04/11/2023","cd":"2023-11-13","lat":9.568469,"lon":123.3206,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":null,"ph":"Package 2","dup":[6885,6892,6900,6908,6919,6924,6938,6944,6953],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":9,"text":"9 other contract(s) with different titles use this exact pin, 9 of them funded in the same year. Combined value at this pin: PHP 856,433,022.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":370},{"i":6963,"cid":"22BG0087","pid":"P00621064LZ","t":"Construction of River Flood Control Structures, Brgy. Dicabisagan West (Airport), Palanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"PALANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"CAMBERWELL CONSTRUCTION AND SUPPLIES / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":46307660.7,"abc":47014507.53,"fy":"2022","sd":"04/13/2022","cd":"2023-12-15","lat":17.060031,"lon":122.428689,"sm":1064,"fm":1064,"tm":1064,"am":1064,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dicabisagan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5381},{"i":6964,"cid":"23FE0061","pid":"P00742206LZ","t":"Construction of Riverbank Protection Structures (along cut-off channel) within Bicol River Basin, Brgy. Malbong, Gainza, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GAINZA (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":74250000.0,"abc":74250000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-11-20","lat":13.612432,"lon":123.125964,"sm":560,"fm":560,"tm":560,"am":560,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.03,"wp":[13.61224,123.12578],"wst":"matched","br":"Malbong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5382},{"i":6965,"cid":"23HL0053","pid":"P00721850VS","t":"Construction of Bayawan River Control, Upstream A, Bayawan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-15","lat":9.36889,"lon":122.80194,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Bayawan","wn":"Bayawan River","wd":0.03,"wp":[9.36907,122.80175],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5383},{"i":6966,"cid":"23GE0042","pid":"P00721644VS","t":"Construction of Flood Mitigation Facility, Barangay Rizal, Jordan, Guimaras","w":"Construction of Flood Mitigation Facility","rg":"Region VI","pv":"GUIMARAS","mu":"JORDAN (CAPITAL) (GUIMARAS)","deo":"Guimaras District Engineering Office","co":"S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY)","c":48997205.76,"abc":49000000.0,"fy":"2023","sd":"02/11/2023","cd":"2023-11-27","lat":10.659469,"lon":122.591642,"sm":674,"fm":674,"tm":674,"am":674,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5384},{"i":6967,"cid":"24FN0005","pid":"P00821408LZ","t":"Construction of Riverbank Protection Structure along Bicol River, Barangay La Purisima Section, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-25","lat":13.417668,"lon":123.320671,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.02,"wp":[13.41762,123.32049],"wst":"matched","br":"La Purisima Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5385},{"i":6968,"cid":"22BG0086","pid":"P00631131LZ","t":"Construction of River Flood Control Structures, Brgy. Dicabisagan West (Aguinaldo Shrine), Palanan, Isabela","w":"Construction of Flood Mitigation Structure","rg":"Region II","pv":"ISABELA","mu":"PALANAN (ISABELA)","deo":"Isabela 3rd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":38415942.07,"abc":39199990.39,"fy":"2022","sd":"02/14/2022","cd":"2023-10-20","lat":17.057772,"lon":122.429878,"sm":1064,"fm":1064,"tm":1064,"am":1064,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dicabisagan West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5386},{"i":6969,"cid":"24GK0070","pid":"P00832632VS","t":"Construction of Drainage System in Teachers Village, Barangay I, Municipality of Manapla, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"MANAPLA (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":4947989.58,"abc":4949998.46,"fy":"2024","sd":"03/13/2024","cd":"2024-06-04","lat":10.957257,"lon":123.126968,"sm":912,"fm":912,"tm":912,"am":912,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5387},{"i":6970,"cid":"23HL0058","pid":"P00722003VS","t":"Construction of Bayawan River Control, Downstream, Bayawan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS)","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-03-22","lat":9.36861,"lon":122.80194,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Bayawan","wn":"Bayawan River","wd":0.05,"wp":[9.36892,122.80161],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5388},{"i":6971,"cid":"21G00148","pid":"P00521538VS","t":"Installation of Pump-gates and Accessories, Iloilo City","w":"Construction of Flood Mitigation Facility","rg":"Region VI","pv":"ILOILO","mu":"Iloilo City","deo":"Iloilo City District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":108845699.4,"abc":115800000.0,"fy":"2021","sd":"03/17/2022","cd":"2024-06-06","lat":10.794758,"lon":122.593369,"sm":635,"fm":null,"tm":635,"am":767,"md":2.46,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5389},{"i":6972,"cid":"23GA0169","pid":"P00721622VS","t":"Rehabilitation of Seawall, Sitio Dumlog, Barangay Tambak, New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"GREENLAND BUILDERS / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":48999990.69,"abc":49000000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-03-18","lat":11.655097,"lon":122.42991,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5390},{"i":6973,"cid":"22HO0064","pid":"P00633009VS","t":"Construction of Road Dike along Valencia River (Left Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":48509993.45,"abc":48509993.45,"fy":"2022","sd":"03/23/2022","cd":"2022-10-24","lat":9.749733,"lon":123.388713,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6981],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,215,985.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":928},{"i":6974,"cid":"22FF0044","pid":"P00621519LZ","t":"Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Balongay, (Balongay Section - Left Side), Calabanga, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CALABANGA (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":57879793.55,"abc":57880302.79,"fy":"2022","sd":"04/01/2022","cd":"2023-06-01","lat":13.715972,"lon":123.128754,"sm":291,"fm":291,"tm":291,"am":291,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.33,"wp":[13.71575,123.12574],"wst":"matched","br":"Balongay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5391},{"i":6975,"cid":"23HO0177","pid":"P00733258VS","t":"Construction of Riverbank Protection at Barangay Poblacion, Ginatilan (Upstream Left Side), Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96495413.69,"abc":96495829.19,"fy":"2023","sd":"04/11/2023","cd":"2024-04-11","lat":9.568563,"lon":123.320761,"sm":584,"fm":584,"tm":584,"am":584,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5392},{"i":6976,"cid":"24JF0003","pid":"P00820011MN","t":"Rehabilitation of Flood Control Structure along Lanao-Pagadian-Zamboanga City Road, Buayan River (Phase VII) (Upstream), Zamboanga Sibugay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region IX","pv":"ZAMBOANGA SIBUGAY","mu":"KABASALAN (ZAMBOANGA SIBUGAY)","deo":"Zamboanga Sibugay 2nd District Engineering Office","co":"BELVIC ENTERPRISES & CONSTRUCTION / FFJJ CONSTRUCTION","c":38178711.63,"abc":53075000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-09-25","lat":7.78244,"lon":122.80389,"sm":683,"fm":683,"tm":null,"am":683,"md":0.0,"ls":"inside","ww":"Buayan","wn":"Buayan River","wd":0.01,"wp":[7.78236,122.80387],"wst":"matched","br":null,"len":null,"ph":"Phase VII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5393},{"i":6977,"cid":"22GI0015","pid":"P00620239VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Brgy. Mambawi, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":96477262.26,"abc":96500000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-03-13","lat":10.839728,"lon":122.431386,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mambawi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5394},{"i":6978,"cid":"23FN0014","pid":"P00726613LZ","t":"Construction of Flood Mitigation Structure along Bicol River (Downstream), Rightside Phase II, Brgy. La Purisima, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":77167401.48,"abc":77167492.0,"fy":"2023","sd":"02/16/2023","cd":"2023-10-27","lat":13.417054,"lon":123.321651,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.41685,123.32195],"wst":"matched","br":"La Purisima","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5395},{"i":6979,"cid":"22GG0066","pid":"P00620016VS","t":"Construction of Sea Wall/Storm Surge Protection, Banate, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BANATE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"F. GURREA CONSTRUCTION, INCORPORATED","c":84636253.6,"abc":86675335.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-20","lat":10.997235,"lon":122.806248,"sm":143,"fm":143,"tm":143,"am":143,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5396},{"i":6980,"cid":"24GI0021","pid":"P00820267VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay Bagumbayan, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"WOODLAND CONSTRUCTION & SUPPLY, INC.","c":66694563.99,"abc":66695010.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-20","lat":10.83747,"lon":122.431435,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5397},{"i":6981,"cid":"22HO0065","pid":"P00633010VS","t":"Construction of Road Dike along Valencia River (Right Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":48705992.01,"abc":48705992.01,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.749733,"lon":123.388713,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6973],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,215,985.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":929},{"i":6982,"cid":"24GK0004","pid":"P00820172VS","t":"Construction of Flood Control Structure along Lag-asan River, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY","c":48997432.14,"abc":48999993.48,"fy":"2024","sd":"03/13/2024","cd":"2024-09-09","lat":10.93694,"lon":123.3222,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Lag-asan","wn":"Lag-asan River","wd":0.01,"wp":[10.93701,123.32229],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5398},{"i":6983,"cid":"24HL0036","pid":"P00820404VS","t":"Construction of Bayawan River Control, Upstream A, Bayawan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF BAYAWAN (TULONG) (NEGROS ORIENTAL)","deo":"Negros Oriental 3rd District Engineering Office","co":"ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.","c":45080000.0,"abc":45080000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-07-12","lat":9.376719,"lon":122.810082,"sm":368,"fm":368,"tm":368,"am":368,"md":0.0,"ls":"inside","ww":"Bayawan","wn":"Bayawan River","wd":0.14,"wp":[9.3756,122.80956],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5399},{"i":6984,"cid":"23GI0029","pid":"P00721749VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay Bagumbayan, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96499785.68,"abc":96500000.0,"fy":"2023","sd":"02/10/2023","cd":"2024-03-25","lat":10.837144,"lon":122.431878,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5400},{"i":6985,"cid":"23HO0121","pid":"P00721875VS","t":"Construction of Dike at Valencia River (Downstream Left Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":96305249.03,"abc":96305251.57,"fy":"2023","sd":"03/16/2023","cd":"2023-11-21","lat":9.750361,"lon":123.388811,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5401},{"i":6986,"cid":"23HO0120","pid":"P00721878VS","t":"Construction of Dike at Valencia River (Upstream Right Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96401605.0,"abc":96401751.14,"fy":"2023","sd":"03/16/2023","cd":"2023-06-20","lat":9.748346,"lon":123.38907,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6991,7295],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 250,603,089.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":782},{"i":6987,"cid":"23GG0019","pid":"P00721657VS","t":"Construction of Sea Wall/Storm Surge Protection With Embankment/Road Concreting, Banate, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"BANATE (ILOILO)","deo":"Iloilo 2nd District Engineering Office","co":"PANAY EAST COAST CONSTRUCTION & SUPPLY","c":29085839.72,"abc":29400000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-11-22","lat":10.997844,"lon":122.810143,"sm":143,"fm":143,"tm":143,"am":143,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5402},{"i":6988,"cid":"22GI0017","pid":"P00620240VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Brgy. Poblacion, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":96499040.75,"abc":96500000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-19","lat":10.814594,"lon":122.433475,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5403},{"i":6989,"cid":"22GK0002","pid":"P00620100VS","t":"Construction of Flood Control Structure of Lag-asan River (both stream) along Bacolod North Road, Cadiz City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"CADIZ CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":44097764.0,"abc":44099984.87,"fy":"2022","sd":"02/08/2022","cd":"2022-08-14","lat":10.936944,"lon":123.322222,"sm":283,"fm":283,"tm":283,"am":283,"md":0.0,"ls":"inside","ww":"Lag-asan","wn":"Lag-asan River","wd":0.01,"wp":[10.937,123.3223],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5404},{"i":6990,"cid":"24GI0020","pid":"P00820268VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay Poblacion (going to Subana), Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY)","c":86848871.29,"abc":86850000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-20","lat":10.812042,"lon":122.433745,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5405},{"i":6991,"cid":"23HO0132","pid":"P00721877VS","t":"Construction of Dike at Valencia River (Upstream Left Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96305168.91,"abc":96305254.11,"fy":"2023","sd":"03/16/2023","cd":"2023-06-20","lat":9.748346,"lon":123.38907,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[6986,7295],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 250,603,089.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":783},{"i":6992,"cid":"24HJ0103","pid":"P00834572VS","t":"Construction of Flood Control Structure along Hibaiyo River Upstream, Guihulngan City, Negros Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"NEGROS ORIENTAL","mu":"CITY OF GUIHULNGAN (NEGROS ORIENTAL)","deo":"Negros Oriental 1st District Engineering Office","co":"HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-20","lat":10.264385,"lon":123.322859,"sm":388,"fm":388,"tm":388,"am":388,"md":0.0,"ls":"inside","ww":"Hibaiyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5406},{"i":6993,"cid":"23GA0168","pid":"P00721482VS","t":"Rehabilitation of Seawall, Barangay Poblacion, New Washington, Aklan","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VI","pv":"AKLAN","mu":"NEW WASHINGTON (AKLAN)","deo":"Aklan District Engineering Office","co":"GREENLAND BUILDERS / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":72374990.05,"abc":72375000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-04-30","lat":11.651585,"lon":122.433793,"sm":1022,"fm":1022,"tm":1022,"am":1022,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5407},{"i":6994,"cid":"23FG0071","pid":"P00727217LZ","t":"Rehabilitation/Improvement of Flood Mitigation Structure (Seawall) along San Miguel Bay, Sogod, Tinambac, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TINAMBAC (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"KCS CONSTRUCTION & SUPPLY","c":48997981.5,"abc":49000000.0,"fy":"2023","sd":"06/19/2023","cd":"2023-12-18","lat":13.819536,"lon":123.323362,"sm":1567,"fm":1567,"tm":1567,"am":1567,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5408},{"i":6995,"cid":"24GI0067","pid":"P00834636VS","t":"Construction of Aganan Flood Control Structure (Jaro-Aganan River), Barangay Balabago, Alimodian, Iloilo","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"ILOILO","mu":"ALIMODIAN (ILOILO)","deo":"Iloilo 4th District Engineering Office","co":"IBC INTERNATIONAL BUILDERS CORPORATION","c":97509993.65,"abc":97510000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-12-17","lat":10.808821,"lon":122.434443,"sm":40,"fm":40,"tm":40,"am":40,"md":0.0,"ls":"inside","ww":"Jaro-Aganan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balabago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5409},{"i":6996,"cid":"22FN0070","pid":"P00630992LZ","t":"Rehabilitation of Bicol River Basin Flood Control Structure (La Purisima Section), Nabua, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RICHMAR CONSTRUCTION","c":50661882.68,"abc":50662500.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-09","lat":13.4183,"lon":123.3234,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":0.04,"wp":[13.41795,123.32338],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5410},{"i":6997,"cid":"24HO0082","pid":"P00834666VS","t":"Construction of Revetment Wall, Phase 2, Barangay Uno, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":39195962.06,"abc":39196412.06,"fy":"2024","sd":"02/26/2024","cd":"2024-09-09","lat":9.64769,"lon":123.323401,"sm":887,"fm":887,"tm":887,"am":887,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Uno","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5411},{"i":6998,"cid":"23HO0230","pid":"P00745595VS","t":"Repair/ Rehabilitation/ Reconstruction of Ginatilan River Flood Control System, Ginatilan, Cebu, Sta. 0+000.00 to Sta. 0+130.00","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"GINATILAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":93358722.0,"abc":93359605.29,"fy":"2023","sd":"08/10/2023","cd":"2024-04-24","lat":9.572771,"lon":123.323602,"sm":584,"fm":584,"tm":362,"am":584,"md":0.0,"ls":"inside","ww":"Ginatilan","wn":"Ginatilan River","wd":0.1,"wp":[9.57196,123.32403],"wst":"matched","br":null,"len":130.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":95.8,"text":"The record contradicts itself: the municipality field and the pin point to Ginatilan, Cebu, but the title names Cebu City, Cebu, 96 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.52,"value":718144,"text":"About PHP 718,144 per metre over 130 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":150},{"i":6999,"cid":"23HO0240","pid":"P00745602VS","t":"Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+102","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":44812058.15,"abc":45508662.88,"fy":"2023","sd":"09/04/2023","cd":"2023-12-18","lat":9.647617,"lon":123.323884,"sm":887,"fm":887,"tm":362,"am":887,"md":0.0,"ls":"inside","ww":"Damaged Saliring","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":57.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":89.32,"text":"The record contradicts itself: the municipality field and the pin point to Malabuyoc, Cebu, but the title names Cebu City, Cebu, 89 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."},{"code":"cost_per_metre_outlier","group":"risk","strength":0.53,"value":786176,"text":"About PHP 786,176 per metre over 57 m, versus a median of PHP 181,986 for rehabilitation works.","benign":"Deep foundations, sheet piling, pumps or difficult terrain raise cost per metre; the title may list only part of the length."}],"rk":223},{"i":7000,"cid":"23G00037","pid":"P00721506VS","t":"Construction of Flood Control Structure at Talave River (Upstream) along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":48250000.0,"abc":48250000.0,"fy":"2023","sd":"02/10/2023","cd":"2024-04-05","lat":10.534892,"lon":123.432305,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Talave","wn":"Talave River","wd":0.02,"wp":[10.53505,123.43246],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5412},{"i":7001,"cid":"24FG0098","pid":"P00844569LZ","t":"Construction of Flood Control System with Groundsill Package 1 at Baranagy Lamon, Goa, Cam Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":120625000.0,"abc":120625000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-03-31","lat":13.781894,"lon":123.433059,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5413},{"i":7002,"cid":"23HO0119","pid":"P00733743VS","t":"Rehabilitation of Riverbank along Ylaya River, Purok Manga Section, Brgy. Ylaya (Left Side), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96496313.54,"abc":96497699.8,"fy":"2023","sd":"04/11/2023","cd":"2023-06-21","lat":9.980656,"lon":123.433731,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ylaya","len":null,"ph":null,"dup":[7006],"run":[],"cl":[7701,7746,7799,7822,7872,7913,7949],"L":"field","s":43,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,703,540.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":170},{"i":7003,"cid":"23HE0091","pid":"P00721536VS","t":"Construction of Drainage along N Bacalso Ave, K0017 + 260 - K0017 + 680 (Leftside); K0018 + 080 - K0018 + 980 (Leftside); K0018 + 980 - K0019 + 380 (Bothside), Barangay Tunghaan, Minglanilla, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"MINGLANILLA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"ARQ BUILDERS / 647 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"05/23/2023","cd":"2024-02-12","lat":10.247227,"lon":123.800357,"sm":979,"fm":979,"tm":979,"am":979,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tunghaan","len":null,"ph":null,"dup":[7115],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 77,330,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":854},{"i":7004,"cid":"24HI0014","pid":"P00820052VS","t":"Construction of Flood Control Structure along Cotcot River, Downstream, Liloan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LILOAN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"MC GEOMETRIC PROPORTIONS, INC. / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96474783.85,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-12-26","lat":10.427582,"lon":124.005541,"sm":790,"fm":790,"tm":790,"am":790,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5414},{"i":7005,"cid":"23HA0076","pid":"P00721939VS","t":"Construction of Flood Mitigation Structure at Upstream and Downstream of Box Culvert at Tagbilaran North Rd (Tagbilaran-Jetafe Section) K0051+312, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"3N CONSTRUCTION & SUPPLY","c":9785651.71,"abc":9800000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-11-17","lat":9.9388,"lon":123.9467,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5415},{"i":7006,"cid":"23HO0143","pid":"P00733250VS","t":"Construction of Riverbank Protection along Talaba River (Sitio Cansibog - Sitio Upper Talayong), Barangay Tupas, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96207226.8,"abc":96207968.1,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.980656,"lon":123.433731,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tupas","len":null,"ph":null,"dup":[7002],"run":[],"cl":[7011,7055,7056,7064,7613,7918,7927,7983,7992],"L":"field","s":44,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,703,540.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":162},{"i":7007,"cid":"24JE0024","pid":"P00821212MN","t":"Construction of Salug Flood Control, Barangay Tumapic, Mahayag, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"MAHAYAG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":39174963.49,"abc":39200000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-20","lat":8.108325,"lon":123.433787,"sm":877,"fm":877,"tm":877,"am":877,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tumapic","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5416},{"i":7008,"cid":"24HO0035","pid":"P00820873VS","t":"Construction of Looc-Poblacion Seawall, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48239207.23,"abc":48243868.9,"fy":"2024","sd":"06/03/2024","cd":"2024-11-20","lat":10.059659,"lon":123.434163,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5417},{"i":7009,"cid":"23FO0062","pid":"P00740465LZ","t":"Construction of Flood Revetment Wall Zone 1 and 2, barangay San Agustin, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":72304999.43,"abc":146555000.0,"fy":"2023","sd":"05/15/2023","cd":"2023-11-30","lat":13.323056,"lon":123.43417,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5418},{"i":7010,"cid":"24FG0099","pid":"P00844570LZ","t":"Construction of Flood Control System with Groundsill Package 2 at Barangay Lamon, Goa, Cam Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":120625000.0,"abc":120625000.0,"fy":"2024","sd":"05/09/2024","cd":"2024-12-28","lat":13.784429,"lon":123.434239,"sm":590,"fm":590,"tm":590,"am":736,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lamon","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5419},{"i":7011,"cid":"23HO0141","pid":"P00733249VS","t":"Construction of River Retaining Wall Structure at Sitio Upper Talayong, Barangay Tupas, Ronda, Cebu (Upstream)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS","c":96302851.43,"abc":96302861.55,"fy":"2023","sd":"04/11/2023","cd":"2023-08-23","lat":9.979987,"lon":123.434658,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7055,7056,7064,7613,7918,7927,7983,7992],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":930},{"i":7012,"cid":"22G00082","pid":"P00620258VS","t":"Construction of Flood Control Structure, Bago River (Upstream - Left Side), Don Salvador Benedicto, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SALVADOR BENEDICTO (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":48249939.29,"abc":48249770.18,"fy":"2022","sd":"02/21/2022","cd":"2022-09-01","lat":10.52836,"lon":123.43487,"sm":1245,"fm":1245,"tm":1245,"am":1262,"md":10.97,"ls":"outside","ww":"Bago","wn":"Bago River","wd":17.88,"wp":[10.48248,123.27819],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":65,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":10.97,"text":"The pin is 11.0 km outside Salvador Benedicto, Negros Occidental, the nearest municipality the record claims. It falls in San Carlos City, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.77,"value":17.88,"text":"The title names Bago, which OpenStreetMap maps through the stated municipality, but the pin is 17.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":65},{"i":7013,"cid":"23JE0017","pid":"P00721494MN","t":"Construction of Flood Control Structure along Labangan River, Dipaya, Labangan, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"LABANGAN (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":19586447.87,"abc":19600000.0,"fy":"2023","sd":"04/26/2023","cd":"2024-08-16","lat":7.922,"lon":123.435,"sm":727,"fm":727,"tm":727,"am":727,"md":0.0,"ls":"inside","ww":"Labangan","wn":"Labangan River","wd":0.09,"wp":[7.9214,123.43451],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5420},{"i":7014,"cid":"24JE0023","pid":"P00820392MN","t":"Construction of Flood Control Project along Labangan River, Dipaya, Labangan, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"LABANGAN (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":29382350.72,"abc":29400000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-05","lat":7.920138,"lon":123.435769,"sm":727,"fm":727,"tm":727,"am":727,"md":0.0,"ls":"inside","ww":"Labangan","wn":"Labangan River","wd":0.04,"wp":[7.92004,123.43545],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5421},{"i":7015,"cid":"23FO0053","pid":"P00740466LZ","t":"Construction of Bacolod Flood Control Structure (Rightside facing Downstream of Bacolod Bridge) Bacolod, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":72373483.6,"abc":146555000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-11-15","lat":13.270885,"lon":123.436687,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5422},{"i":7016,"cid":"24HO0109","pid":"P00834596VS","t":"Construction of Revetment Wall at Sitio Upper Talayong - Sitio Cansibog (Right Side), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":57895771.96,"abc":57896085.01,"fy":"2024","sd":"03/12/2024","cd":"2024-05-13","lat":9.979961,"lon":123.436819,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7017],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 115,791,538.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":855},{"i":7017,"cid":"24HO0119","pid":"P00834595VS","t":"Construction of Revetment Wall at Sitio Upper Talayong - Sitio Cansibog (Left Side), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":57895766.39,"abc":57896066.39,"fy":"2024","sd":"04/01/2024","cd":"2024-07-12","lat":9.979961,"lon":123.436819,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7016],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 115,791,538.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":856},{"i":7018,"cid":"22G00048","pid":"P00620256VS","t":"Construction of Flood Control Structure of Talave River (Downstream) Left Bank along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":33775000.0,"abc":33775000.0,"fy":"2022","sd":"03/02/2022","cd":"2023-08-12","lat":10.512261,"lon":123.4393,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Talave","wn":"Talave River","wd":0.02,"wp":[10.51227,123.43946],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5423},{"i":7019,"cid":"23HG0023","pid":"P00721675VS","t":"Construction of Lagnason Flood Control, Oslob, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"OSLOB (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"EDANNA CONSTRUCTION","c":29399995.65,"abc":29400000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-05-15","lat":9.534064,"lon":123.440492,"sm":1045,"fm":1045,"tm":1045,"am":1045,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5424},{"i":7020,"cid":"23FA0044","pid":"P00727205LZ","t":"Construction of Sto. Cristo Seawall, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":29400000.0,"abc":71049999.14,"fy":"2023","sd":"06/26/2023","cd":"2024-02-14","lat":13.213625,"lon":123.4411,"sm":423,"fm":423,"tm":423,"am":1031,"md":20.46,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":20.46,"text":"The pin is 20.5 km outside City of Tabaco, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":224},{"i":7021,"cid":"22FA0035","pid":"P00631351LZ","t":"Rehabilitation of Tiagao Riverwall, Malilipot, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY)","c":19600000.0,"abc":19599999.96,"fy":"2022","sd":"03/16/2022","cd":"2022-07-11","lat":13.191443,"lon":123.441409,"sm":895,"fm":895,"tm":895,"am":1031,"md":27.11,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":27.11,"text":"The pin is 27.1 km outside Malilipot, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":235},{"i":7022,"cid":"22FA0045","pid":"P00631323LZ","t":"Construction of Drainage Structure (Line Canal with Cover), Brgy. 1, Barangay I - Poblacion, Malilipot, Albay","w":"Construction of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":4900000.0,"abc":53899992.32,"fy":"2022","sd":"08/05/2022","cd":"2023-01-29","lat":13.19556,"lon":123.442361,"sm":895,"fm":895,"tm":895,"am":1031,"md":26.9,"ls":"outside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":26.9,"text":"The pin is 26.9 km outside Malilipot, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":291},{"i":7023,"cid":"22FA0045","pid":"P00631324LZ","t":"Construction of Drainage Structure (Line Canal with Cover), Brgy. 3, Barangay III - Poblacion, Malilipot, Albay","w":"Construction of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":4900000.0,"abc":53899992.32,"fy":"2022","sd":"08/05/2022","cd":"2023-01-29","lat":13.19437,"lon":123.442559,"sm":895,"fm":895,"tm":895,"am":1031,"md":26.91,"ls":"outside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":26.91,"text":"The pin is 26.9 km outside Malilipot, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":292},{"i":7024,"cid":"22JD0059","pid":"P00620199MN","t":"Construction of Flood Control Structure along Dapitan River, Leop Bridge (B00584MN) Barcelona Section, along Dipolog-Oroquieta Road (S01316MN), Dapitan City, Zamboanga del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"DAPITAN CITY (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":93823025.2,"abc":94770720.0,"fy":"2022","sd":"02/24/2022","cd":"2023-10-03","lat":8.53806,"lon":123.4443,"sm":484,"fm":484,"tm":484,"am":484,"md":0.0,"ls":"inside","ww":"Dapitan","wn":"Dapitan River","wd":0.08,"wp":[8.53868,123.44459],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5425},{"i":7025,"cid":"22HO0002","pid":"P00620044VS","t":"Construction of Ylaya Flood Control (Upstream), Ylaya, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48320749.0,"abc":49071869.95,"fy":"2022","sd":"02/21/2022","cd":"2022-09-26","lat":10.053886,"lon":123.444353,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5426},{"i":7026,"cid":"22FO0055","pid":"P00631373LZ","t":"Rehabilitation of Pangarian River Flood Mitigation Structure with Access Road, Barangay La Medalla, Pio Duran, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"PIO DURAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":43987387.89,"abc":92956675.49,"fy":"2022","sd":"03/22/2022","cd":"2023-03-01","lat":13.04709,"lon":123.44494,"sm":1146,"fm":1146,"tm":1146,"am":1146,"md":0.0,"ls":"inside","ww":"Pangarian","wn":"Pangarian River","wd":0.05,"wp":[13.047,123.4454],"wst":"matched","br":"La Medalla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5427},{"i":7027,"cid":"22HO0059","pid":"P00620457VS","t":"Construction of Tapon-Tangil Seawall (L/S), Sta. 0 + 000 - Sta. 0 + 181, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999927.85,"abc":48999927.85,"fy":"2022","sd":"03/23/2022","cd":"2022-11-10","lat":10.064725,"lon":123.445875,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":181.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5428},{"i":7028,"cid":"23HO0124","pid":"P00733255VS","t":"Construction of Riverbank Protection at Bala River (Downstream Right Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96302742.83,"abc":96302757.9,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.951671,"lon":123.446052,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":"Bala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5429},{"i":7029,"cid":"23HO0130","pid":"P00733254VS","t":"Construction of Riverbank Protection at Bala River (Downstream Left Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96302624.08,"abc":96302851.74,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.951635,"lon":123.446192,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":"Bala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5430},{"i":7030,"cid":"23HO0123","pid":"P00733256VS","t":"Construction of Riverbank Protection at Bala River (Upstream Left Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96302869.75,"abc":96302901.81,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.951681,"lon":123.446268,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":"Bala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7031],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,299,308.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":784},{"i":7031,"cid":"23HO0159","pid":"P00733302VS","t":"Construction of River Retaining Wall at Barangay Lanao (Left Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48996438.0,"abc":48997410.83,"fy":"2023","sd":"04/11/2023","cd":"2023-11-15","lat":9.951681,"lon":123.446268,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lanao","len":null,"ph":null,"dup":[7030],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,299,308.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":931},{"i":7032,"cid":"23HO0131","pid":"P00733257VS","t":"Construction of Riverbank Protection at Bala River (Upstream Right Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96302785.31,"abc":96303005.92,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":9.951553,"lon":123.446269,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":"Bala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7033],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,799,935.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":785},{"i":7033,"cid":"23HO0149","pid":"P00733745VS","t":"Rehabilitation of Riverbank along Lanao River (Downstream), Moalboal, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J","c":96497149.81,"abc":96497377.37,"fy":"2023","sd":"04/11/2023","cd":"2024-04-19","lat":9.951553,"lon":123.446269,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":"Lanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7032],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,799,935.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":786},{"i":7034,"cid":"22FG0003","pid":"P00620313LZ","t":"Construction/Improvement of Flood Control Structure along Balangao River, Sta. 0+532 - Sta. 0+865 (upstream), Sta. 0+616 - Sta. 0+890 (downstream), Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TIGAON (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":82025000.0,"abc":82025000.0,"fy":"2022","sd":"04/05/2022","cd":"2023-01-13","lat":13.58498,"lon":123.446503,"sm":1564,"fm":1564,"tm":1564,"am":1033,"md":0.0,"ls":"inside","ww":"Balangao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":607.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5431},{"i":7035,"cid":"23FA0044","pid":"P00727210LZ","t":"Construction of Sto. Cristo Seawall (Phase 3), Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":41650000.0,"abc":71049999.14,"fy":"2023","sd":"06/26/2023","cd":"2024-02-14","lat":13.213027,"lon":123.44661,"sm":423,"fm":423,"tm":423,"am":1031,"md":20.0,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":20.0,"text":"The pin is 20.0 km outside City of Tabaco, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":218},{"i":7036,"cid":"23HO0223","pid":"P00721547VS","t":"Construction of Ylaya Flood Control (Upstream) (Phase II), Ylaya, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":87812030.33,"abc":87812215.64,"fy":"2023","sd":"06/27/2023","cd":"2023-09-27","lat":10.054072,"lon":123.446623,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5432},{"i":7037,"cid":"23HO0142","pid":"P00733244VS","t":"Construction of River Control Structure at Barangay Paculob - Barangay Ylaya, (Upstream), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96205338.56,"abc":96205468.74,"fy":"2023","sd":"04/11/2023","cd":"2023-11-15","lat":10.053659,"lon":123.44676,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paculob","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5433},{"i":7038,"cid":"23HO0047","pid":"P00721510VS","t":"Construction of Revetment Wall at Brgy. Tapon, Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96014116.92,"abc":96014118.04,"fy":"2023","sd":"02/08/2023","cd":"2023-11-20","lat":10.053397,"lon":123.446801,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tapon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5434},{"i":7039,"cid":"23HO0045","pid":"P00721874VS","t":"Construction of Revetment Wall (Upstream) at Brgy. Tapon, Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96110610.97,"abc":96110620.61,"fy":"2023","sd":"03/23/2023","cd":"2024-01-30","lat":10.053045,"lon":123.446898,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tapon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5435},{"i":7040,"cid":"22HO0005","pid":"P00620042VS","t":"Construction of Tapon-Tangil Seawall, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48998325.59,"abc":48998325.59,"fy":"2022","sd":"02/10/2022","cd":"2022-09-26","lat":10.063981,"lon":123.447017,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5436},{"i":7041,"cid":"24HO0084","pid":"P00834661VS","t":"Construction of Revetment Wall at Barangay Bala - Barangay Lanao (Upstream Left Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"SUDAN CONSTRUCTION AND SUPPLY CORP.","c":29395164.54,"abc":29395359.15,"fy":"2024","sd":"02/26/2024","cd":"2024-04-15","lat":9.949124,"lon":123.448941,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5437},{"i":7042,"cid":"22FG0037","pid":"P00631421LZ","t":"Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Olas, Lagonoy, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-08-21","lat":13.918532,"lon":123.450775,"sm":736,"fm":736,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5438},{"i":7043,"cid":"22FI0003","pid":"P00620746LZ","t":"Rehabilitation/Improvement of Narangasan River Control, Milagros, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"GACT ENTERPRISES","c":25080160.0,"abc":25080105.49,"fy":"2022","sd":"02/08/2022","cd":"2022-08-16","lat":12.226135,"lon":123.452783,"sm":974,"fm":974,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":"Narangasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5439},{"i":7044,"cid":"22FA0002","pid":"P00631331LZ","t":"Rehabilitation of Basud River Flood Control System (Upstream), Sto. Domingo, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":49000000.0,"abc":48999731.93,"fy":"2022","sd":"05/09/2022","cd":"2022-11-25","lat":13.134615,"lon":123.453509,"sm":1411,"fm":88,"tm":1411,"am":396,"md":28.17,"ls":"outside","ww":"Basud","wn":"Basud River","wd":29.79,"wp":[13.25522,123.69935],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":71,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":28.17,"text":"The pin is 28.2 km outside Santo Domingo, Albay, the nearest municipality the record claims. It falls in City of Ligao, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.84,"value":29.79,"text":"The title names Basud, which OpenStreetMap maps through the stated municipality, but the pin is 29.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":49},{"i":7045,"cid":"22FA0009","pid":"P00631336LZ","t":"Rehabilitation of Revetment, Upstream of San Fernando Bridge 2, Right Side, Barangay Bonga (Upper), Bacacay, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":49000000.0,"abc":48999292.7,"fy":"2022","sd":"02/24/2022","cd":"2022-09-25","lat":13.152657,"lon":123.453782,"sm":88,"fm":88,"tm":88,"am":396,"md":28.65,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.99,"value":28.65,"text":"The pin is 28.6 km outside Bacacay, Albay, the nearest municipality the record claims. It falls in City of Ligao, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":160},{"i":7046,"cid":"23JE0060","pid":"P00721599MN","t":"Construction of Flood Control Lower Sto. Niño, Mahayag, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"MAHAYAG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES)","c":53850000.0,"abc":53900000.0,"fy":"2023","sd":"08/31/2023","cd":"2024-04-23","lat":8.077,"lon":123.456,"sm":877,"fm":877,"tm":877,"am":984,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5440},{"i":7047,"cid":"22FG0008","pid":"P00620314LZ","t":"Construction/Improvement of Flood Control Structure along Panagan River, Sta. 0+300 - Sta.0+600 (upstream), Sta. 0+401.05 - Sta. 0+701.05 (downstream), Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TIGAON (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":82025000.0,"abc":82025000.0,"fy":"2022","sd":"03/17/2022","cd":"2023-01-18","lat":13.593096,"lon":123.456935,"sm":1564,"fm":1564,"tm":1564,"am":1564,"md":0.0,"ls":"inside","ww":"Panagan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5441},{"i":7048,"cid":"23FO0044","pid":"P00740467LZ","t":"Construction of Flood Mitigation Structure of Luksong River, Zone 4 Section, Santicon, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2023-09-12","lat":13.323042,"lon":123.45817,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Luksong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5442},{"i":7049,"cid":"22FN0032","pid":"P00631433LZ","t":"Construction of River Slope Protection along Igamot Creek, Salvacion and Busakan, Barangay San Vicente, Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":47282777.73,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-10-25","lat":13.459593,"lon":123.459593,"sm":86,"fm":86,"tm":86,"am":246,"md":5.23,"ls":"outside","ww":"Igamot","wn":"Igamot Creek","wd":10.06,"wp":[13.45492,123.36679],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":60,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.23,"text":"The pin is 5.2 km outside Baao, Camarines Sur, the nearest municipality the record claims. It falls in Buhi, Camarines Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.68,"value":10.06,"text":"The title names Igamot, which OpenStreetMap maps through the stated municipality, but the pin is 10.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":100},{"i":7050,"cid":"23HG0046","pid":"P00721679VS","t":"Construction of Pungtod Flood Control, Oslob, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"OSLOB (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"BT CONSTRUCTION AND GENERAL SERVICES","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-09-26","lat":9.565892,"lon":123.459778,"sm":1045,"fm":1045,"tm":1045,"am":1045,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5443},{"i":7051,"cid":"22FO0021","pid":"P00631371LZ","t":"Rehabilitation of Malidong River Wall, Pioduran, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"PIO DURAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"ELKANKONSTRAK DEVELOPMENT CORPORATION","c":19557075.83,"abc":19557075.83,"fy":"2022","sd":"02/17/2022","cd":"2022-09-29","lat":13.01693,"lon":123.45993,"sm":1146,"fm":1146,"tm":1146,"am":1146,"md":0.0,"ls":"inside","ww":"Malidong","wn":"Malidong Creek","wd":0.0,"wp":[13.01691,123.45993],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5444},{"i":7052,"cid":"22FO0040","pid":"P00631382LZ","t":"Rehabilitation of Tula-Tula Riverwall, Ligao City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"VINMOR CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-08-20","lat":13.016843,"lon":123.45995,"sm":396,"fm":396,"tm":396,"am":1146,"md":8.14,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":8.14,"text":"The pin is 8.1 km outside City of Ligao, Albay, the nearest municipality the record claims. It falls in Pio Duran, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":303},{"i":7053,"cid":"23JE0066","pid":"P00721605MN","t":"Construction of Flood Control along Brgy. Katipunan, Ramon Magsaysay, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"RAMON MAGSAYSAY (LIARGO) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"NRMM CONSTRUCTION AND DEV'T CORP.","c":53849885.62,"abc":53900000.0,"fy":"2023","sd":"04/26/2023","cd":"2023-12-18","lat":8.053,"lon":123.46,"sm":1199,"fm":1199,"tm":1199,"am":1199,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Katipunan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":462},{"i":7054,"cid":"24JE0032","pid":"P00821073MN","t":"Construction of River Control Structure along Lenienza Creek, Barangay Tiguma, Pagadian City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PAGADIAN CITY (CAPITAL) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":29374518.4,"abc":29400000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-08-08","lat":7.847208,"lon":123.462669,"sm":1054,"fm":1054,"tm":1054,"am":1054,"md":0.0,"ls":"inside","ww":"Lenienza","wn":"Lenienza Creek","wd":0.01,"wp":[7.84723,123.46272],"wst":"matched","br":"Tiguma","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5445},{"i":7055,"cid":"23HO0155","pid":"P00733252VS","t":"Construction of Riverbank Protection along Talaba River Sitio Cansibog, Barangay Tupas, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96304156.61,"abc":96304438.09,"fy":"2023","sd":"04/11/2023","cd":"2024-02-19","lat":9.971952,"lon":123.462713,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7011,7056,7064,7613,7918,7927,7983,7992],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":932},{"i":7056,"cid":"23HO0148","pid":"P00733253VS","t":"Construction of Riverbank Protection along Talaba River, Barangay Tupas, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96497208.87,"abc":96497418.6,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.97202,"lon":123.462808,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7011,7055,7064,7613,7918,7927,7983,7992],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":933},{"i":7057,"cid":"23JE0075","pid":"P00721603MN","t":"Construction of River Control Structure with Access Road along Lenienza Creek, Brgy. Tiguma, Pagadian City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PAGADIAN CITY (CAPITAL) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS) / ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":78400000.0,"abc":78400000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-03-08","lat":7.847,"lon":123.463,"sm":1054,"fm":1054,"tm":1054,"am":1054,"md":0.0,"ls":"inside","ww":"Lenienza","wn":"Lenienza Creek","wd":0.02,"wp":[7.84694,123.46283],"wst":"matched","br":"Tiguma","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5446},{"i":7058,"cid":"23HO0138","pid":"P00733744VS","t":"Construction of Dike Strucures along Talaba River Sitio Bagonbon (Left Side), Brgy. Liboo, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96496818.2,"abc":96496918.11,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.972412,"lon":123.463,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Liboo","len":null,"ph":null,"dup":[7059],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,704,763.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":787},{"i":7059,"cid":"23HO0144","pid":"P00733242VS","t":"Construction of Revetment Wall at Barangay Vive - Barangay Tupas River Flood Control, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96207944.4,"abc":96207965.7,"fy":"2023","sd":"04/11/2023","cd":"2023-12-19","lat":9.972412,"lon":123.463,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Barangay Tupas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Vive","len":null,"ph":null,"dup":[7058],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,704,763.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":788},{"i":7060,"cid":"22HO0054","pid":"P00633003VS","t":"Construction of Revetment Wall along Brgy. Vive River Flood Control (Section 2), Ronda, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":48999980.42,"abc":48999980.42,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.972821,"lon":123.463051,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Brgy. Vive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Vive River Flood Control","len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5447},{"i":7061,"cid":"23HO0122","pid":"P00733237VS","t":"Construction of Revetment Wall along Barangay Vive River Flood Control, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96303639.41,"abc":96303649.73,"fy":"2023","sd":"04/11/2023","cd":"2024-02-19","lat":9.972797,"lon":123.463105,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Barangay Vive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Vive River Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5448},{"i":7062,"cid":"22HO0053","pid":"P00633002VS","t":"Construction of Revetment Wall along Brgy. Vive River Flood Control (Section 1), Ronda, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":48395100.0,"abc":48999971.56,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":9.972853,"lon":123.463112,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Brgy. Vive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Vive River Flood Control","len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5449},{"i":7063,"cid":"23HO0140","pid":"P00733239VS","t":"Construction of Revetment Wall along Sitio Elithon, Barangay Vive River Flood Control, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96304443.13,"abc":96304465.68,"fy":"2023","sd":"04/11/2023","cd":"2024-02-19","lat":9.97286,"lon":123.463164,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Barangay Vive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Vive River Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5450},{"i":7064,"cid":"23HO0163","pid":"P00733241VS","t":"Construction of Revetment Wall at Barangay Tupas - Barangay Vive River Flood Control, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96400924.58,"abc":96400965.21,"fy":"2023","sd":"04/11/2023","cd":"2023-12-19","lat":9.972633,"lon":123.463746,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Barangay Vive","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7011,7055,7056,7613,7918,7927,7983,7992],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":934},{"i":7065,"cid":"22G00083","pid":"P00620257VS","t":"Construction of Flood Control Structure, Bago River (Downstream), Don Salvador Benedicto, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SALVADOR BENEDICTO (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"WILKINSON CONSTRUCTION","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-11","lat":10.56164,"lon":123.46465,"sm":1245,"fm":1245,"tm":1245,"am":299,"md":12.68,"ls":"outside","ww":"Bago","wn":"Bago River","wd":22.2,"wp":[10.48248,123.27819],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":66,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.87,"value":12.68,"text":"The pin is 12.7 km outside Salvador Benedicto, Negros Occidental, the nearest municipality the record claims. It falls in Calatrava, Negros Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.8,"value":22.2,"text":"The title names Bago, which OpenStreetMap maps through the stated municipality, but the pin is 22.2 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":62},{"i":7066,"cid":"24FO0058","pid":"P00823607LZ","t":"Construction of Flood Mitigation Structure along Kalakran River, Purok 6 to 8, Barangay Saban, Oas, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"04/15/2024","cd":"2025-02-08","lat":13.25616,"lon":123.46495,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":"Kalakran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Saban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5451},{"i":7067,"cid":"23FO0048","pid":"P00740471LZ","t":"Construction of Agos River Control Structure, barangay La Purisima, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":72305000.0,"abc":144610000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-05-08","lat":13.36224,"lon":123.46562,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Agos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"La Purisima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5452},{"i":7068,"cid":"23HO0086","pid":"P00721886VS","t":"Construction of River Retaining Wall at Brgy. Kantangkas (Left Side), Dumanjug Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96498045.79,"abc":96498255.29,"fy":"2023","sd":"03/23/2023","cd":"2023-10-11","lat":10.036089,"lon":123.468061,"sm":539,"fm":539,"tm":null,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kantangkas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5453},{"i":7069,"cid":"24HO0004","pid":"P00832615VS","t":"Construction of Flood Control Structure, Barangay Kantangkas (Upstream), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":98996461.23,"abc":98996961.23,"fy":"2024","sd":"02/16/2024","cd":"2024-10-03","lat":10.037241,"lon":123.468669,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kantangkas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5454},{"i":7070,"cid":"21FO0050","pid":"P00526484LZ","t":"Rehabilitation/Improvement of Flood Mitigation Structure at Kinale, Polangui, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"Polangui","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":29316368.64,"abc":30380000.0,"fy":"2021","sd":"01/19/2022","cd":"2022-07-31","lat":13.288847,"lon":123.471547,"sm":1157,"fm":null,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5455},{"i":7071,"cid":"22FO0037","pid":"P00620692LZ","t":"Construction/ Repair/Rehabilitation/Improvement of Alomon Flood Control, Alomon, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"R. RELATO CONSTRUCTION","c":21824598.38,"abc":21824600.0,"fy":"2022","sd":"06/06/2022","cd":"2023-01-06","lat":13.286,"lon":123.47172,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5456},{"i":7072,"cid":"21G00034","pid":"P00521541VS","t":"Construction of Flood Control Structures at Patun-an River, Abut \"A\" (Upstream) along Bacolod North Road (S00408NR), Calatrava, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"Calatrava","deo":"Negros Occidental 5th District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":79106840.0,"abc":79106840.0,"fy":"2021","sd":"02/19/2021","cd":"2022-08-02","lat":10.57088,"lon":123.4731,"sm":299,"fm":null,"tm":299,"am":299,"md":0.0,"ls":"inside","ww":"Patun-an","wn":"Patun-an River","wd":0.01,"wp":[10.57077,123.47307],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5457},{"i":7073,"cid":"22J00013","pid":"P00620004MN","t":"Construction of Flood Control Structure along Kipit River, Gutalac, Zamboanga del Norte (at Kipit Br. Section along Liloy - Siocon Road (S01146MN))","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"LABASON (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 3rd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":97293841.99,"abc":97294497.96,"fy":"2022","sd":"02/18/2022","cd":"2022-12-20","lat":8.06027,"lon":123.47341,"sm":728,"fm":728,"tm":608,"am":984,"md":92.44,"ls":"outside","ww":"Kipit","wn":"Kipit River","wd":109.86,"wp":[8.07299,122.47645],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":83,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":92.44,"text":"The pin is 92.4 km outside Labason, Zamboanga del Norte, the nearest municipality the record claims. It falls in Molave, Zamboanga del Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":109.86,"text":"The title names Kipit, which OpenStreetMap maps through the stated municipality, but the pin is 109.9 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":11},{"i":7074,"cid":"22FI0037","pid":"P00620738LZ","t":"Construction of Seawall, Poblacion, Aroroy, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"AROROY (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"JOHNCB CONSTRUCTION & SUPPLIES","c":24499132.16,"abc":24499969.03,"fy":"2022","sd":"02/08/2022","cd":"2022-08-15","lat":12.485331,"lon":123.475129,"sm":75,"fm":75,"tm":75,"am":126,"md":4.75,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.73,"value":4.75,"text":"The pin is 4.8 km outside Aroroy, Masbate, the nearest municipality the record claims. It falls in Baleno, Masbate.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":330},{"i":7075,"cid":"23HO0036","pid":"P00721509VS","t":"Construction of Revetment Wall at Brgy. Colabtingon, Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96302053.8,"abc":96305247.38,"fy":"2023","sd":"02/08/2023","cd":"2023-08-23","lat":10.02951,"lon":123.475158,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colabtingon","len":null,"ph":null,"dup":[7076],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,794,863.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":789},{"i":7076,"cid":"23HO0074","pid":"P00721887VS","t":"Construction of River Retaining Wall at Brgy. Colabtingon (Right Side), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96492809.55,"abc":96498243.99,"fy":"2023","sd":"03/23/2023","cd":"2023-08-22","lat":10.02951,"lon":123.475158,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colabtingon","len":null,"ph":null,"dup":[7075],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,794,863.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":790},{"i":7077,"cid":"22FO0025","pid":"P00631369LZ","t":"Rehabilitation of Busac River Wall, Oas, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"ELKANKONSTRAK DEVELOPMENT CORPORATION","c":19598937.42,"abc":19600000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-16","lat":13.25833,"lon":123.4768,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":"Busac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5458},{"i":7078,"cid":"23HO0147","pid":"P00733236VS","t":"Construction of Dike along Kang-actol River (Left Side), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96496733.21,"abc":96496735.66,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":10.023142,"lon":123.478546,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kang-actol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5459},{"i":7079,"cid":"23HG0047","pid":"P00721941VS","t":"Construction of Lusapon Flood Control, Boljoon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BOLJOON (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"WYNE ROSE CONSTRUCTION AND SUPPLY CORP.","c":29399938.4,"abc":29400000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-08-15","lat":9.6236,"lon":123.478656,"sm":220,"fm":220,"tm":220,"am":220,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5460},{"i":7080,"cid":"23HO0145","pid":"P00733247VS","t":"Construction of River Control Structures at Bgry. Ylaya - Barangay Paculob (Upstream), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":86845976.88,"abc":86846017.51,"fy":"2023","sd":"04/11/2023","cd":"2024-03-28","lat":10.022318,"lon":123.479835,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paculob","len":null,"ph":null,"dup":[7081,7082,7083],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 365,050,287.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":371},{"i":7081,"cid":"23HO0146","pid":"P00733246VS","t":"Construction of River Control Structure at Barangay Tubod-Dugoan (Upstream), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":86847397.29,"abc":86847453.38,"fy":"2023","sd":"04/11/2023","cd":"2023-09-25","lat":10.022318,"lon":123.479835,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tubod-Dugoan","len":null,"ph":null,"dup":[7080,7082,7083],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 365,050,287.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":372},{"i":7082,"cid":"23HO0162","pid":"P00733248VS","t":"Construction of River Retaining Wall at Barangay Kanguha (Right Side), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96496912.4,"abc":96496917.46,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":10.022318,"lon":123.479835,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kanguha","len":null,"ph":null,"dup":[7080,7081,7083],"run":[],"cl":[],"L":"field","s":40,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 365,050,287.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":297},{"i":7083,"cid":"23HO0165","pid":"P00733245VS","t":"Construction of River Control Structure at Barangay Pawa, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":94860000.0,"abc":96304067.86,"fy":"2023","sd":"04/11/2023","cd":"2023-12-15","lat":10.022318,"lon":123.479835,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pawa","len":null,"ph":null,"dup":[7080,7081,7082],"run":[],"cl":[],"L":"field","s":39,"sig":[{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 365,050,287.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":373},{"i":7084,"cid":"23HO0129","pid":"P00733235VS","t":"Construction of Dike along Kang-actol River (Downstream), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96497704.66,"abc":96497705.05,"fy":"2023","sd":"04/11/2023","cd":"2023-12-11","lat":10.022531,"lon":123.48015,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kang-actol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5461},{"i":7085,"cid":"24FN0006","pid":"P00820425LZ","t":"Construction of Bank Protection Structure along Barit River, Santa Justina Section, Barangay San Justina, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-11-19","lat":13.402366,"lon":123.48019,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.03,"wp":[13.4026,123.48023],"wst":"matched","br":"San Justina","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5462},{"i":7086,"cid":"23JE0052","pid":"P00721602MN","t":"Construction of Flood Control Purok Namnama Brgy. Tawagan Norte, Labangan, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"LABANGAN (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION","c":14684995.71,"abc":14700000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-08-14","lat":7.875,"lon":123.481,"sm":727,"fm":727,"tm":727,"am":727,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tawagan Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5463},{"i":7087,"cid":"23JE0067","pid":"P00721604MN","t":"Construction of Flood Control Brgy. Lower Pulacan, Labangan, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"LABANGAN (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":53851405.11,"abc":53900000.0,"fy":"2023","sd":"04/26/2023","cd":"2025-02-06","lat":7.894,"lon":123.481,"sm":727,"fm":727,"tm":727,"am":727,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lower Pulacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5464},{"i":7088,"cid":"23FN0041","pid":"P00726973LZ","t":"Construction of Riverbank Protection/Esplanade along Barit River, Brgy. Sta. Justina Section, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":139819182.0,"abc":139824182.0,"fy":"2023","sd":"03/22/2023","cd":"2024-07-12","lat":13.40151,"lon":123.48191,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.40156,123.48194],"wst":"matched","br":"Sta. Justina Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5465},{"i":7089,"cid":"22HO0067","pid":"P00633008VS","t":"Construction of Road Dike along Pawa River, Damanjug, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS / QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48754979.41,"abc":48754979.41,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":10.021119,"lon":123.481956,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Pawa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5466},{"i":7090,"cid":"22HO0066","pid":"P00633007VS","t":"Construction of Road Dike along Kang-actol River, Damanjug, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48264980.74,"abc":48264980.74,"fy":"2022","sd":"03/23/2022","cd":"2022-10-24","lat":10.021104,"lon":123.482,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kang-actol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5467},{"i":7091,"cid":"22F00136","pid":"P00620325LZ","t":"Construction/Rehabilitation of Sta. Cruz Storm Surge Protection, Donsol, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":140956866.0,"abc":279839557.3,"fy":"2022","sd":"07/14/2022","cd":"2023-12-20","lat":12.987851,"lon":123.48367,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5468},{"i":7092,"cid":"23HO0049","pid":"P00721946VS","t":"Construction of Road Dike along Kabalaasnan River (Phase II), Dumanjug, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS","c":48997477.13,"abc":48997646.06,"fy":"2023","sd":"03/06/2023","cd":"2023-05-16","lat":10.007212,"lon":123.486318,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kabalaasnan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[7093],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,495,703.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":935},{"i":7093,"cid":"23HO0128","pid":"P00733234VS","t":"Construction of Dike along Kabalaasnan River, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS","c":96498225.85,"abc":96498258.25,"fy":"2023","sd":"04/11/2023","cd":"2023-06-19","lat":10.007212,"lon":123.486318,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kabalaasnan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7092],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 145,495,703.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":791},{"i":7094,"cid":"22HO0063","pid":"P00633006VS","t":"Construction of Road Dike along Kabalaasnan River, Damanjug, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS / QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48803966.54,"abc":48803966.54,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":10.002593,"lon":123.487604,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Kabalaasnan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5469},{"i":7095,"cid":"23HO0164","pid":"P00733238VS","t":"Construction of Revetment Wall along Manlapay River (Phase 2), Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96300450.1,"abc":96302820.25,"fy":"2023","sd":"04/11/2023","cd":"2023-12-15","lat":10.053311,"lon":123.489267,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Manlapay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[7096],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,122,190.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":792},{"i":7096,"cid":"23HO0166","pid":"P00733240VS","t":"Construction of Revetment Wall at Barangay Balaygtiki, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":95821739.57,"abc":95821967.19,"fy":"2023","sd":"06/13/2023","cd":"2023-12-15","lat":10.053311,"lon":123.489267,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balaygtiki","len":null,"ph":null,"dup":[7095],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,122,190.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":793},{"i":7097,"cid":"23HO0056","pid":"P00721524VS","t":"Construction of Revetment Wall along Manlapay River (Section 1), Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96011592.91,"abc":96014135.07,"fy":"2023","sd":"02/08/2023","cd":"2023-08-22","lat":10.054057,"lon":123.49026,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Manlapay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5470},{"i":7098,"cid":"22FI0013","pid":"P00620745LZ","t":"Rehabilitation/Improvement of Manulib River Control, Milagros, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"3R3M CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: 3R3M CONSTRUCTION AND SUPPLY)","c":24465683.83,"abc":24465683.83,"fy":"2022","sd":"02/07/2022","cd":"2022-08-14","lat":12.234121,"lon":123.490549,"sm":974,"fm":974,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":"Manulib","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5471},{"i":7099,"cid":"23FG0037","pid":"P00736101LZ","t":"Construction of Flood Mitigation Structure along Baliguon River (Phase 2), Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":95536200.0,"abc":95536200.0,"fy":"2023","sd":"02/26/2023","cd":"2024-04-01","lat":13.689202,"lon":123.490813,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Baliguon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5472},{"i":7100,"cid":"23FO0048","pid":"P00740470LZ","t":"Construction of Agos River Control Structure, barangay Lourdes, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":72305000.0,"abc":144610000.0,"fy":"2023","sd":"05/15/2023","cd":"2024-05-08","lat":13.36312,"lon":123.49132,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Agos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lourdes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5473},{"i":7101,"cid":"21FI0041","pid":"P00561849LZ","t":"Construction of Flood Control Mitigation Facilities along Manulib River, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"Milagros","deo":"Masbate 2nd District Engineering Office","co":"3R3M CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: 3R3M CONSTRUCTION AND SUPPLY)","c":29700000.0,"abc":29699956.55,"fy":"2021","sd":"02/28/2022","cd":"2022-08-30","lat":12.234814,"lon":123.491541,"sm":974,"fm":null,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":"Manulib","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5474},{"i":7102,"cid":"22FO0064","pid":"P00631370LZ","t":"Rehabilitation of Kalakaran Riverwall, Oas, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"ELKANKONSTRAK DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-11-10","lat":13.2725,"lon":123.493,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5475},{"i":7103,"cid":"22FG0046","pid":"P00620316LZ","t":"Construction/Improvement of Flood Control Structure along Sagpon River, Sta. 0+480 - Sta. 0+784.50 bothside (Upstream), Sta. 0+525 - Sta. 0+707 (L/S), Sta.0+743 - Sta. 0+799 (LS), Sta. 0+555 - Sta. 0+643 (R/S), Sta. 0+682.50 - Sta. 0+799 (R/S), Sta. 2+055 - Sta. 2+617 both side (Downstream), Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TIGAON (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":82025000.0,"abc":82025000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-11-11","lat":13.640278,"lon":123.49315,"sm":1564,"fm":1564,"tm":1564,"am":1564,"md":0.0,"ls":"inside","ww":"Sagpon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1309.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5476},{"i":7104,"cid":"24KJ0077","pid":"P00835875MN","t":"Rehabilitation of Spillway, Taguite Elementary School, Taguite, Tangub City, Misamis Occidental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"ABIB BUILDERS ENTERPRISE","c":4752999.28,"abc":4900000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-24","lat":8.092017,"lon":123.696377,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5477},{"i":7105,"cid":"23HN0071","pid":"P00721760VS","t":"Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Tabok, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-11-28","lat":10.342097,"lon":123.94716,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34205,123.94714],"wst":"matched","br":"Tabok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5478},{"i":7106,"cid":"23FK0028","pid":"P00742485LZ","t":"Reconstruction/Rehabilitation of Seawall, Brgy. Inapugan, Pilar, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"PILAR (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":4949945.99,"abc":56939964.51,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":12.8711,"lon":123.696561,"sm":1131,"fm":1131,"tm":1131,"am":1131,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inapugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5479},{"i":7107,"cid":"23FB0099","pid":"P00740443LZ","t":"Construction of Cagsawa Ruins Protection Dike, (Tributary ''D''), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":72373476.66,"abc":72373544.13,"fy":"2023","sd":"04/19/2023","cd":"2023-09-30","lat":13.166895,"lon":123.696884,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5480},{"i":7108,"cid":"24KJ0073","pid":"P00835871MN","t":"Construction of Drainage Structure, Caniangan-Taguite, Tangub City, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"WEISENWORK CONSTRUCTION","c":4752999.45,"abc":4900000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-24","lat":8.09166,"lon":123.697427,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5481},{"i":7109,"cid":"22KI0019","pid":"P00620153MN","t":"Construction of Coastal Protection, Brgy. Sta. Cruz, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":35404455.04,"abc":35404460.0,"fy":"2022","sd":"03/14/2022","cd":"2022-09-20","lat":8.629387,"lon":123.69743,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5482},{"i":7110,"cid":"23FB0025","pid":"P00737377LZ","t":"Construction of Dike along Busay River (Upstream of Bridge), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION)","c":67548347.27,"abc":67548487.89,"fy":"2023","sd":"02/27/2023","cd":"2023-09-15","lat":13.162566,"lon":123.697546,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5483},{"i":7111,"cid":"23FB0026","pid":"P00737378LZ","t":"Construction of Dike along Busay River (Downstream), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION)","c":57898423.68,"abc":57898485.71,"fy":"2023","sd":"02/27/2023","cd":"2023-08-31","lat":13.162801,"lon":123.697865,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5484},{"i":7112,"cid":"21FB0051","pid":"P00526194LZ","t":"Construction of Cagsawa Ruins Protection Dike, (Tributary \"F\"), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"Daraga","deo":"Albay 2nd District Engineering Office","co":"ANKOR GAULLE CONSTRUCTION AND SUPPLY CORPORATION","c":29398117.6,"abc":29398331.55,"fy":"2021","sd":"03/02/2022","cd":"2022-07-13","lat":13.168753,"lon":123.698994,"sm":485,"fm":null,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5485},{"i":7113,"cid":"22FB0005","pid":"P00621129LZ","t":"Construction of Cagsawa Ruins Protection Dike (Tributary ''F''), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION","c":67547845.61,"abc":67548441.49,"fy":"2022","sd":"03/04/2022","cd":"2022-09-22","lat":13.168919,"lon":123.699074,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5486},{"i":7114,"cid":"23FK0089","pid":"P00742487LZ","t":"Rehabilitation of Burabod River Control, Brgy. Burabod, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":9557940.64,"abc":54449963.17,"fy":"2023","sd":"07/18/2023","cd":"2024-03-05","lat":12.973156,"lon":124.00567,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Burabod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Burabod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5487},{"i":7115,"cid":"23HE0092","pid":"P00721671VS","t":"Construction of Drainage System along N Bacalso Ave, Minglanilla, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"MINGLANILLA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"AR ADLAWAN CONSTRUCTION","c":9780000.0,"abc":9800000.0,"fy":"2023","sd":"05/04/2023","cd":"2023-11-14","lat":10.247227,"lon":123.800357,"sm":979,"fm":979,"tm":979,"am":979,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7003],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 77,330,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1061},{"i":7116,"cid":"22FB0034","pid":"P00621126LZ","t":"Construction of Cagsawa Ruins Protection Dike (Tributary ''A''), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CBC CONSTRUCTION & SUPPLY","c":72372651.51,"abc":72373180.75,"fy":"2022","sd":"03/04/2022","cd":"2022-08-31","lat":13.164978,"lon":123.699166,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5488},{"i":7117,"cid":"21FB0093","pid":"P00526193LZ","t":"Construction of Cagsawa Ruins Protection Dike, (Tributary \"B\"), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"Daraga","deo":"Albay 2nd District Engineering Office","co":"ANKOR GAULLE CONSTRUCTION AND SUPPLY CORPORATION","c":29397833.0,"abc":29398402.85,"fy":"2021","sd":"03/02/2022","cd":"2022-07-13","lat":13.170239,"lon":123.700289,"sm":485,"fm":null,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5489},{"i":7118,"cid":"23FA0036","pid":"P00727203LZ","t":"Construction of Mariroc Flood Mitigation Structure, Tabaco City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":20580000.0,"abc":75459988.26,"fy":"2023","sd":"05/15/2023","cd":"2023-11-06","lat":13.348029,"lon":123.700466,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5490},{"i":7119,"cid":"22FB0276","pid":"P00621546LZ","t":"Construction of Flood Mitigation Structure along Budiao-Busay River (Phase 2), Sta. 1 + 000 - Sta. 1 + 220, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48998161.04,"abc":48998413.09,"fy":"2022","sd":"06/30/2022","cd":"2022-12-26","lat":13.166536,"lon":123.702401,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Budiao-Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":220.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5491},{"i":7120,"cid":"23KI0017","pid":"P00721377MN","t":"Construction of Seawall at the Storm Surge Prone Coastal, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"MINDANAO ROCK","c":47529998.48,"abc":49000000.0,"fy":"2023","sd":"02/26/2023","cd":"2023-09-14","lat":8.627477,"lon":123.704109,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5492},{"i":7121,"cid":"22KI0020","pid":"P00620152MN","t":"Construction of Coastal Protection, Brgy. Kauswagan, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":35348469.03,"abc":35404460.0,"fy":"2022","sd":"03/14/2022","cd":"2022-09-20","lat":8.627402,"lon":123.704384,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kauswagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5493},{"i":7122,"cid":"22KI0026","pid":"P00620154MN","t":"Construction of River Control, Brgy. Kauswagan, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"SILVER CONSTRUCTION","c":28421918.91,"abc":29400000.0,"fy":"2022","sd":"06/05/2022","cd":"2023-04-30","lat":8.622612,"lon":123.704554,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kauswagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5494},{"i":7123,"cid":"22FB0013","pid":"P00621127LZ","t":"Construction of Cagsawa Ruins Protection Dike (Tributary ''B''), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION","c":67548080.26,"abc":67548450.3,"fy":"2022","sd":"03/04/2022","cd":"2022-09-22","lat":13.161075,"lon":123.704677,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5495},{"i":7124,"cid":"22HO0061","pid":"P00633232VS","t":"Construction of Waterway along Manlapay River (Section 2), Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48508341.34,"abc":48508341.34,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":10.053297,"lon":123.493286,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Manlapay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5496},{"i":7125,"cid":"23FB0098","pid":"P00740669LZ","t":"Construction of River Bank Protection Works and Drainage System along Bascaran-Talahib River, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":48675979.44,"abc":48676181.97,"fy":"2023","sd":"04/05/2023","cd":"2023-10-01","lat":13.098768,"lon":123.705824,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Bascaran-Talahib","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5497},{"i":7126,"cid":"23F00163","pid":"P00736134LZ","t":"Construction of Flood Mitigation Structure along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN JACINTO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48249895.41,"abc":48249895.41,"fy":"2023","sd":"07/13/2023","cd":"2024-04-02","lat":12.569686,"lon":123.706058,"sm":1295,"fm":1295,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Rosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5498},{"i":7127,"cid":"23FA0021","pid":"P00740473LZ","t":"Construction of River Dike at barangay Canaway, Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96499978.52,"fy":"2023","sd":"04/12/2023","cd":"2023-12-26","lat":13.326119,"lon":123.706705,"sm":895,"fm":895,"tm":895,"am":423,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canaway","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5499},{"i":7128,"cid":"21KI0116","pid":"P00550543MN","t":"Construction of Flood Control Structure at Langaran River between Northern Poblacion and Kauswagan, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"Plaridel","deo":"Misamis Occidental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":58864693.36,"abc":63300000.0,"fy":"2021","sd":"12/12/2021","cd":"2022-12-15","lat":8.623664,"lon":123.707021,"sm":1154,"fm":null,"tm":1154,"am":1154,"md":0.01,"ls":"boundary","ww":"Langaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5500},{"i":7129,"cid":"21KI0030","pid":"P00550438MN","t":"Construction of Drainage Structure,  Barangay Calacaan to Northern Poblacion, Plaridel, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"Plaridel","deo":"Misamis Occidental 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":57899999.97,"abc":59400000.0,"fy":"2021","sd":"12/15/2021","cd":"2022-10-18","lat":8.617814,"lon":123.707023,"sm":1154,"fm":null,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calacaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5501},{"i":7130,"cid":"23FB0114","pid":"P00726969LZ","t":"Construction/Upgrading/Rehabilitation of Flood Mitigation System at Barangay Busay to Barangay Cullat - Malobago River, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"QDC CONSTRUCTION AND SUPPLY / 3RB CONSTRUCTION & SUPPLY","c":72373340.99,"abc":72373558.73,"fy":"2023","sd":"04/17/2023","cd":"2023-12-18","lat":13.158426,"lon":123.708412,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Malobago","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Busay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5502},{"i":7131,"cid":"22F00164","pid":"P00640480LZ","t":"Rehabilitation of Flood Mitigation Structure along Tutuban River, Brgy. Sta. Rosa, San Jacinto, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"SAN JACINTO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98998436.24,"abc":98998436.24,"fy":"2022","sd":"07/28/2022","cd":"2023-06-08","lat":12.569668,"lon":123.708548,"sm":1295,"fm":1295,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":"Tutuban","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Rosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5503},{"i":7132,"cid":"21KI0117","pid":"P00550571MN","t":"Construction/Rehabilitation of Drainage Structure with Sidewalk, Plaridel, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"Plaridel","deo":"Misamis Occidental 1st District Engineering Office","co":"RJLG CONSTRUCTION AND SUPPLIES","c":8057107.97,"abc":9900000.0,"fy":"2021","sd":"02/08/2022","cd":"2022-08-31","lat":8.621449,"lon":123.709475,"sm":1154,"fm":null,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5504},{"i":7133,"cid":"23F00003","pid":"P00726622LZ","t":"Construction of Quinale ''B'' River Flood Mitigation Structure, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":144748972.1,"abc":144748972.1,"fy":"2023","sd":"03/30/2023","cd":"2023-12-15","lat":13.411122,"lon":123.709894,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"B''","wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5505},{"i":7134,"cid":"23FB0116","pid":"P00740658LZ","t":"Construction of Flood Mitigation Structures along Busay-Cullat Malobago River, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION)","c":24498279.9,"abc":24498553.59,"fy":"2023","sd":"04/17/2023","cd":"2023-07-28","lat":13.158,"lon":123.71,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Busay-Cullat Malobago","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":542},{"i":7135,"cid":"23H00039","pid":"P00721544VS","t":"Construction of Tabagak-Bunakan Seawall, Madridejos, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MADRIDEJOS (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION / ROVILLA CONSTRUCTION","c":96499608.51,"abc":96500000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-14","lat":11.258713,"lon":123.711423,"sm":859,"fm":859,"tm":859,"am":859,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5506},{"i":7136,"cid":"23FB0065","pid":"P00736142LZ","t":"Construction of Flood Control Dike and Slope Protection along Mariawa-Anislag (Phase II), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.","c":48178149.83,"abc":48178611.02,"fy":"2023","sd":"07/03/2023","cd":"2023-12-24","lat":13.07949,"lon":123.713318,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5507},{"i":7137,"cid":"23FM0011","pid":"P00726294LZ","t":"Construction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Buenos Aires, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"KYLA CONSTRUCTION SUPPLY","c":23519999.15,"abc":23520000.0,"fy":"2023","sd":"04/09/2023","cd":"2024-02-02","lat":12.49528,"lon":123.7136,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buenos Aires","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5508},{"i":7138,"cid":"24HE0160","pid":"P00820854VS","t":"Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 1) Left Side","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96390888.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-10-15","lat":10.270507,"lon":123.713705,"sm":408,"fm":408,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lanas","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5509},{"i":7139,"cid":"24HE0159","pid":"P00820867VS","t":"Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 2) Right Side","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-09-20","lat":10.270519,"lon":123.713728,"sm":408,"fm":408,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lanas","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5510},{"i":7140,"cid":"23FA0034","pid":"P00727208LZ","t":"Rehabilitation of Baybay Seawall, Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":2940000.0,"abc":118739934.6,"fy":"2023","sd":"05/15/2023","cd":"2024-03-06","lat":13.407433,"lon":123.714347,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5511},{"i":7141,"cid":"24HF0004","pid":"P00820345VS","t":"Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96201348.9,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-11-20","lat":10.517608,"lon":123.714439,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantuod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5512},{"i":7142,"cid":"24KJ0107","pid":"P00835872MN","t":"Construction of Drainage Structure, Lumban, Tangub City, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"WEISENWORK CONSTRUCTION","c":4752999.34,"abc":4900000.0,"fy":"2024","sd":"06/20/2024","cd":"2025-01-28","lat":8.094667,"lon":123.714447,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5513},{"i":7143,"cid":"23HF0016","pid":"P00721767VS","t":"Construction of Flood Mitigation Structure at Combado River, (Nangka Side), Barangay Cantuod, Balamban, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES","c":67451959.0,"abc":67550000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-10-20","lat":10.518753,"lon":123.714459,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantuod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5514},{"i":7144,"cid":"23FB0108","pid":"P00742472LZ","t":"Construction of Dike along Brgy. Kilikao to Yawa River Channel Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JEJAN CONSTRUCTION AND SUPPLY(FOR. JEJAN CONSTRUCT","c":29698072.37,"abc":29698522.26,"fy":"2023","sd":"04/10/2023","cd":"2023-08-17","lat":13.158396,"lon":123.714866,"sm":485,"fm":485,"tm":null,"am":485,"md":0.0,"ls":"inside","ww":"Yawa","wn":"Yawa River","wd":0.06,"wp":[13.15791,123.71516],"wst":"matched","br":"Kilikao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5515},{"i":7145,"cid":"22FB0138","pid":"P00630978LZ","t":"Construction of Malobago Flood Control System including Esplanade along Malobago-Busay River (Main), Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / KRATOS DEVELOPMENT CORP.","c":57898264.38,"abc":57898364.38,"fy":"2022","sd":"03/21/2022","cd":"2022-10-23","lat":13.158652,"lon":123.714871,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Malobago-Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5516},{"i":7146,"cid":"23FB0113","pid":"P00726976LZ","t":"Construction of Flood Control System (Purok 1, 2, 3 and 6), Kilicao Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"MANITO (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CBC CONSTRUCTION & SUPPLY","c":72373461.51,"abc":72373550.87,"fy":"2023","sd":"04/10/2023","cd":"2023-10-22","lat":13.158484,"lon":123.715189,"sm":919,"fm":919,"tm":null,"am":485,"md":14.46,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.89,"value":14.46,"text":"The pin is 14.5 km outside Manito, Albay, the nearest municipality the record claims. It falls in Daraga, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":175},{"i":7147,"cid":"22FK0011","pid":"P00620760LZ","t":"Construction of Putiao River Control, Pilar Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"PILAR (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":47304633.91,"abc":48999974.96,"fy":"2022","sd":"02/16/2022","cd":"2022-11-18","lat":12.020212,"lon":123.715683,"sm":1131,"fm":1131,"tm":null,"am":361,"md":91.25,"ls":"outside","ww":"Putiao","wn":"Putiao River","wd":99.75,"wp":[12.92214,123.72091],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":68,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":91.25,"text":"The pin is 91.2 km outside Pilar, Sorsogon, the nearest municipality the record claims. It falls in Cawayan, Masbate.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.9,"value":99.75,"text":"The title names Putiao, which OpenStreetMap maps through the stated municipality, but the pin is 99.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":56},{"i":7148,"cid":"22F00184","pid":"P00640478LZ","t":"Rehabilitation of Flood Mitigation Structure along Bito River, Brgy. Buenos Aires, San Fernando, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98999705.73,"abc":98999705.73,"fy":"2022","sd":"08/22/2022","cd":"2023-11-18","lat":12.494265,"lon":123.716496,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buenos Aires","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5517},{"i":7149,"cid":"22FB0206","pid":"P00631341LZ","t":"Construction of Daraga Drainage System, Daraga, Albay","w":"Construction of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JEJAN CONSTRUCTION AND SUPPLY(FOR. JEJAN CONSTRUCT","c":29397676.96,"abc":29398368.82,"fy":"2022","sd":"04/06/2022","cd":"2022-12-04","lat":13.149731,"lon":123.716702,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5518},{"i":7150,"cid":"22FB0130","pid":"P00630999LZ","t":"Rehabilitation of Revetment, Upstream of Barangay Bonga Spillway, Barangay Mabinit, Legazpi City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":57897955.0,"abc":57898285.51,"fy":"2022","sd":"03/16/2022","cd":"2022-10-18","lat":13.196578,"lon":123.717276,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Barangay Bonga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bonga Spillway","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5519},{"i":7151,"cid":"21HE0157","pid":"P00549965VS","t":"Construction of San Isidro River Flood Control Structure, San Fernando, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"San Fernando","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"11/03/2021","cd":"2022-08-01","lat":10.174602,"lon":123.717817,"sm":1273,"fm":null,"tm":1273,"am":1273,"md":0.0,"ls":"inside","ww":"San Isidro","wn":"San Isidro River","wd":0.0,"wp":[10.17459,123.7178],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5520},{"i":7152,"cid":"23FA0019","pid":"P00740480LZ","t":"Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":144750000.0,"abc":144749999.0,"fy":"2023","sd":"04/14/2023","cd":"2023-11-07","lat":13.35377,"lon":123.7182,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Baranghawon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baranghawon","len":null,"ph":null,"dup":[7153],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 166,310,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":694},{"i":7153,"cid":"23FA0035","pid":"P00727202LZ","t":"Construction of Baranghawon Flood Mitigation Structure, Tabaco City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":21560000.0,"abc":46059971.1,"fy":"2023","sd":"05/09/2023","cd":"2023-09-15","lat":13.35377,"lon":123.7182,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7152],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 166,310,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1001},{"i":7154,"cid":"22FB0094","pid":"P00620273LZ","t":"Construction of Bagtang - Maroroy Flood Control System (both sides), Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96497819.97,"abc":96498239.06,"fy":"2022","sd":"04/13/2022","cd":"2023-02-02","lat":13.151646,"lon":123.720601,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5521},{"i":7155,"cid":"24HE0056","pid":"P00820353VS","t":"Construction of Lutac River Flood Control Structure, Naga City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS / JANUARY BUILDERS","c":120575000.0,"abc":120625000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-08-19","lat":10.236222,"lon":123.721977,"sm":408,"fm":408,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":"Lutac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5522},{"i":7156,"cid":"21F00011","pid":"P00525682LZ","t":"Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":115800000.0,"abc":115799985.6,"fy":"2021","sd":"08/16/2021","cd":"2022-09-15","lat":13.189581,"lon":123.722469,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5523},{"i":7157,"cid":"22F00105","pid":"P00620684LZ","t":"Construction/ Rehabilitation of Bonga Flood Control System, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":39191886.59,"abc":40529505.35,"fy":"2022","sd":"03/21/2022","cd":"2022-12-22","lat":13.188329,"lon":123.722524,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5524},{"i":7158,"cid":"22FB0041","pid":"P00620679LZ","t":"Construction of Bagtang-Maroroy-Tagas Creek, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALPHARD PRIMECON CONSTRUCTION","c":29339615.74,"abc":29398109.49,"fy":"2022","sd":"02/21/2022","cd":"2022-07-17","lat":13.153876,"lon":123.723386,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Bagtang-Maroroy-Tagas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5525},{"i":7159,"cid":"23FB0148","pid":"P00740659LZ","t":"Construction of Flood Mitigation Structure (Revetment Wall), Sitio Misua B, Banquerohan, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CBC CONSTRUCTION & SUPPLY","c":48885924.75,"abc":48886193.0,"fy":"2023","sd":"06/19/2023","cd":"2023-12-06","lat":13.036393,"lon":123.723449,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5526},{"i":7160,"cid":"24HF0008","pid":"P00820399VS","t":"Rehabilitation of Flood Mitigation Structure at Combado River, Barangay Cantuod, Balamban, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"W.GO CONSTRUCTION AND SUPPLY","c":19501488.5,"abc":19600000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-07-12","lat":10.52816,"lon":123.724099,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantuod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5527},{"i":7161,"cid":"23HF0021","pid":"P00721820VS","t":"Rehabilitation of Flood Mitigation Structure at Combado River, Barangay Cantuod, Balamban, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":19403655.0,"abc":19600000.0,"fy":"2023","sd":"02/02/2023","cd":"2023-07-28","lat":10.526972,"lon":123.72446,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantuod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5528},{"i":7162,"cid":"24HD0038","pid":"P00820073VS","t":"Construction of Tarong-Talangnan Seawall, Madridejos, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MADRIDEJOS (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION / ROVILLA CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-11-21","lat":11.29505,"lon":123.72452,"sm":859,"fm":859,"tm":859,"am":859,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5529},{"i":7163,"cid":"21FA0037","pid":"P00561812LZ","t":"Flood mitigation and rehabilitation of river control infrastructures along the Tagas River, Tabaco City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"City of Tabaco","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY)","c":21037500.0,"abc":21037038.51,"fy":"2021","sd":"04/11/2022","cd":"2022-09-10","lat":13.35146,"lon":123.72459,"sm":423,"fm":null,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Tagas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5530},{"i":7164,"cid":"24KI0062","pid":"P00835781MN","t":"Construction of Shore Line Protection, Barangay Southern Looc, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"ANIMAS BROS CONSTRUCTION CORPORATION (FORMERLY: ANIMAS BROS CONSTRUCTION)","c":86849960.44,"abc":86850000.0,"fy":"2024","sd":"05/16/2024","cd":"2025-03-28","lat":8.60344,"lon":123.72584,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Southern Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5531},{"i":7165,"cid":"21FA0041","pid":"P00561194LZ","t":"Flood mitigation and rehabilitation of river control structures along the upstream of Tagas River in Tabaco City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":null,"deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":22770000.0,"abc":22769820.13,"fy":"2021","sd":"04/20/2022","cd":"2022-09-09","lat":13.35186,"lon":123.72588,"sm":null,"fm":null,"tm":null,"am":423,"md":null,"ls":"unknown","ww":"Tagas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":151},{"i":7166,"cid":"22FB0044","pid":"P00620688LZ","t":"Upgrading of River Bank Protection Works along Mariawa-Taysan River, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / 3RB CONSTRUCTION & SUPPLY","c":47979306.09,"abc":47979582.02,"fy":"2022","sd":"02/21/2022","cd":"2022-07-12","lat":13.100958,"lon":123.726991,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Mariawa-Taysan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5532},{"i":7167,"cid":"24FM0036","pid":"P00821011LZ","t":"Construction of Flood Mitigation Structure, Bito River (Upstream), Barangay Magkaipit, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"ALXM CONSTRUCTION & DEV'T. CORP. (FORMERLY:ALXM CONSTRUCTION)","c":48999995.07,"abc":49000000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-08-16","lat":12.489722,"lon":123.728611,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magkaipit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5533},{"i":7168,"cid":"23HF0012","pid":"P00721765VS","t":"Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES","c":67177531.0,"abc":67550000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-10-20","lat":10.524242,"lon":123.728864,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Singsing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5534},{"i":7169,"cid":"23FM0008","pid":"P00726293LZ","t":"Construction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Magkaipit, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"KYLA CONSTRUCTION SUPPLY","c":23519966.83,"abc":23520000.0,"fy":"2023","sd":"04/09/2023","cd":"2024-01-02","lat":12.48889,"lon":123.7292,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magkaipit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5535},{"i":7170,"cid":"22FB0107","pid":"P00632948LZ","t":"Construction of River Bank Protection Structure and Drainage System along Bugit River (Downstream Section), Imalnod, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"TWINCARE BUILDERS INC. / 3RB CONSTRUCTION & SUPPLY","c":49479552.03,"abc":49498324.28,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":13.076346,"lon":123.729282,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Bugit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5536},{"i":7171,"cid":"24HF0003","pid":"P00820344VS","t":"Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES","c":96315000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-11-20","lat":10.522118,"lon":123.72943,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Singsing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5537},{"i":7172,"cid":"23HF0014","pid":"P00721766VS","t":"Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BALAMBAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":66947542.0,"abc":67550000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-10-20","lat":10.527033,"lon":123.729453,"sm":118,"fm":118,"tm":118,"am":118,"md":0.0,"ls":"inside","ww":"Combado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantuod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5538},{"i":7173,"cid":"23FB0123","pid":"P00727213LZ","t":"Construction of River Bank Protection Works and Drainage System, Brgy. Imalnod, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ROCA BLANCA CONSTRUCTION","c":29398908.74,"abc":29398956.34,"fy":"2023","sd":"05/03/2023","cd":"2023-06-23","lat":13.075391,"lon":123.729889,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Imalnod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5539},{"i":7174,"cid":"22FB0042","pid":"P00620687LZ","t":"Upgrading of River Bank Protection Works along Mariawa-Imalnod River, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":47977926.84,"abc":47977981.86,"fy":"2022","sd":"02/21/2022","cd":"2022-08-12","lat":13.0956,"lon":123.729919,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Mariawa-Imalnod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5540},{"i":7175,"cid":"22FB0136","pid":"P00640571LZ","t":"Construction of Dike/Revetment Structures Along Bgy. Mariawa, Legazpi City, Albay","w":"Construction of Revetment","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":34649568.31,"abc":34649920.75,"fy":"2022","sd":"04/11/2022","cd":"2022-09-13","lat":13.091607,"lon":123.73032,"sm":768,"fm":485,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mariawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5541},{"i":7176,"cid":"24FA0030","pid":"P00820993LZ","t":"Construction of Sta. Cruz River Control (Downstream), Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / JORMAND CONSTRUCTION & SUPPLY","c":39200000.0,"abc":87449970.17,"fy":"2024","sd":"06/24/2024","cd":"2025-02-07","lat":13.322455,"lon":123.730956,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Sta. Cruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5542},{"i":7177,"cid":"22FA0014","pid":"P00620310LZ","t":"Construction/Extension of Fatima Seawall, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":94570000.0,"abc":94569992.05,"fy":"2022","sd":"03/09/2022","cd":"2022-12-23","lat":13.352557,"lon":123.730992,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5543},{"i":7178,"cid":"22FB0017","pid":"P00620690LZ","t":"Upgrading of River Bank Protection Works along Sagumayon River (Upstream of Sagpon Bridge), Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":39197847.13,"abc":39198450.26,"fy":"2022","sd":"02/21/2022","cd":"2022-08-02","lat":13.139492,"lon":123.731298,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Sagumayon","wn":"Sagumayon River","wd":0.16,"wp":[13.14073,123.732],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5544},{"i":7179,"cid":"24FA0030","pid":"P00823643LZ","t":"Construction/Extension of Tiagao River Control, Sta. Cruz Section, Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / JORMAND CONSTRUCTION & SUPPLY","c":48250000.0,"abc":87449970.17,"fy":"2024","sd":"06/24/2024","cd":"2025-02-07","lat":13.32195,"lon":123.731664,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Tiagao","wn":"Tiagao River","wd":0.05,"wp":[13.3223,123.73189],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5545},{"i":7180,"cid":"22FA0075","pid":"P00640568LZ","t":"Repair and Improvement of the Flood Mitigation and River Control along the Tagas River","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":16830000.0,"abc":66329638.23,"fy":"2022","sd":"06/23/2022","cd":"2022-11-11","lat":13.35454,"lon":123.73193,"sm":423,"fm":423,"tm":null,"am":423,"md":0.0,"ls":"inside","ww":"Tagas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5546},{"i":7181,"cid":"23FA0036","pid":"P00727206LZ","t":"Rehabilitation of Drainage System including Box Culvert of Tabaco City Wharf Road, Tabaco City, Albay","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":4900000.0,"abc":75459988.26,"fy":"2023","sd":"05/15/2023","cd":"2023-11-06","lat":13.360254,"lon":123.732795,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5547},{"i":7182,"cid":"23FM0013","pid":"P00726296LZ","t":"Construction of Flood Mitigation Structure (Upstream), Brgy. Progreso, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"JIMWELL BUILDERS AND SUPPLIES CORPORATION (FORMERLY:JIMWELL BUILDERS)","c":23519995.67,"abc":23520000.0,"fy":"2023","sd":"04/09/2023","cd":"2023-08-30","lat":12.46528,"lon":123.7336,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Progreso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5548},{"i":7183,"cid":"21F00005","pid":"P00525675LZ","t":"Construction/Improvement of Kapantaran River Flood Mitigation Structures (Homapon - Imalnod Section), Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":144750000.0,"abc":289499999.7,"fy":"2021","sd":"03/19/2021","cd":"2022-09-21","lat":13.074227,"lon":123.734053,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Kapantaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5549},{"i":7184,"cid":"24HE0059","pid":"P00820354VS","t":"Construction of Mainit River Flood Control Structure, Naga City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS / JANUARY BUILDERS","c":96450000.0,"abc":96500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-05-10","lat":10.218236,"lon":123.734275,"sm":408,"fm":408,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":"Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5550},{"i":7185,"cid":"23FA0030","pid":"P00737555LZ","t":"Construction of Tayhi River Control/Flood Mitigation at Barangay Cormidal, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":5940000.0,"abc":30689724.37,"fy":"2023","sd":"04/27/2023","cd":"2023-08-31","lat":13.365391,"lon":123.734513,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Tayhi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cormidal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5551},{"i":7186,"cid":"23HE0133","pid":"P00721819VS","t":"Construction of Mainit River Flood Control Structure, Naga City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"JANUARY BUILDERS","c":34290000.0,"abc":34300000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-10-10","lat":10.217598,"lon":123.735336,"sm":408,"fm":408,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":"Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5552},{"i":7187,"cid":"23FA0036","pid":"P00727204LZ","t":"Construction of Sta. Cruz Flood Mitigation Structure, Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":20580000.0,"abc":75459988.26,"fy":"2023","sd":"05/15/2023","cd":"2023-11-06","lat":13.321383,"lon":123.735549,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5553},{"i":7188,"cid":"23FA0040","pid":"P00726987LZ","t":"Construction of Quinale Seawall, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL / 3RB CONSTRUCTION & SUPPLY","c":96500000.0,"abc":138149999.5,"fy":"2023","sd":"05/26/2023","cd":"2024-03-05","lat":13.360487,"lon":123.736191,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5554},{"i":7189,"cid":"22F00106","pid":"P00620307LZ","t":"Construction/ Rehabilitation of Padang River Flood Mitigation Structure, Brgy. Buyuan and Brgy. Padang, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":47123519.5,"abc":48731844.78,"fy":"2022","sd":"03/21/2022","cd":"2023-01-22","lat":13.21686,"lon":123.736496,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Padang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buyuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5555},{"i":7190,"cid":"23FA0040","pid":"P00727209LZ","t":"Construction of Quinale Seawall, Tabaco City, Albay Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL / 3RB CONSTRUCTION & SUPPLY","c":41650000.0,"abc":138149999.5,"fy":"2023","sd":"05/26/2023","cd":"2024-03-05","lat":13.359529,"lon":123.736508,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5556},{"i":7191,"cid":"24FB0047","pid":"P00844787LZ","t":"Construction of Flood Mitigation Structure along Barangay Pawa, Legazpi City, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":48998722.69,"abc":48998954.51,"fy":"2024","sd":"03/25/2024","cd":"2024-10-10","lat":13.182665,"lon":123.737238,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5557},{"i":7192,"cid":"22FA0015","pid":"P00620677LZ","t":"Construction/ Extension of San Roque-Fatima Seawall, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":19600000.0,"abc":19600195.19,"fy":"2022","sd":"02/24/2022","cd":"2022-07-13","lat":13.353674,"lon":123.737584,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5558},{"i":7193,"cid":"22FA0024","pid":"P00620678LZ","t":"Construction/ Extension of Sto. Cristo Seawall, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":39200000.0,"abc":39199371.85,"fy":"2022","sd":"02/24/2022","cd":"2022-08-02","lat":13.358511,"lon":123.737742,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5559},{"i":7194,"cid":"24FB0051","pid":"P00844788LZ","t":"Construction of Flood Mitigation Structure, Barangay 56 Taysan, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / KNJ CONSTRUCTION AND SUPPLY","c":48998837.03,"abc":48998956.32,"fy":"2024","sd":"03/25/2024","cd":"2024-09-20","lat":13.11579,"lon":123.737839,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"56 Taysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5560},{"i":7195,"cid":"22FA0018","pid":"P00620303LZ","t":"Construction/ Extension of Seawall, San Roque, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":77200000.0,"abc":77199999.96,"fy":"2022","sd":"03/09/2022","cd":"2023-01-03","lat":13.356312,"lon":123.738019,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7196],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 173,694,643.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":104},{"i":7196,"cid":"22FB0249","pid":"P00639391LZ","t":"Construction of Poblacion Shore Protection, Rapu-Rapu, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"RAPU-RAPU (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96494642.76,"abc":96494876.5,"fy":"2022","sd":"06/20/2022","cd":"2023-04-12","lat":13.356312,"lon":123.738019,"sm":1201,"fm":1201,"tm":1201,"am":423,"md":20.01,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7195],"run":[],"cl":[],"L":"records","s":82,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":20.01,"text":"The pin is 20.0 km outside Rapu-Rapu, Albay, the nearest municipality the record claims. It falls in City of Tabaco, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 173,694,643.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":15},{"i":7197,"cid":"23FA0054","pid":"P00740497LZ","t":"Construction/Extension of Fatima Seawall (Phase 3), Tabaco City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION / 8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":96500000.0,"abc":96499772.26,"fy":"2023","sd":"08/18/2023","cd":"2024-04-16","lat":13.352726,"lon":123.738086,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5561},{"i":7198,"cid":"23FB0100","pid":"P00740671LZ","t":"Construction of River Bank Protection Works and Drainage System along Brgy. Tamaoyan, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JEJAN CONSTRUCTION AND SUPPLY(FOR. JEJAN CONSTRUCT / TWINCARE BUILDERS INC.","c":48927385.73,"abc":48928064.13,"fy":"2023","sd":"06/19/2023","cd":"2023-12-15","lat":13.175218,"lon":123.738275,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tamaoyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5562},{"i":7199,"cid":"22FA0058","pid":"P00631334LZ","t":"Rehabilitation of Calbayog River Wall, Malilipot, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":24500000.0,"abc":34299996.45,"fy":"2022","sd":"05/30/2022","cd":"2022-09-30","lat":13.287436,"lon":123.738438,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Calbayog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5563},{"i":7200,"cid":"24FM0038","pid":"P00820504LZ","t":"Construction of San Jacinto Shore Protection Structure, Sitio Cagas, Barangay Calipat-an, San Jacinto, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN JACINTO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / EJ CANTORIA CONSTRUCTION & SUPPLY","c":63156272.13,"abc":63156355.0,"fy":"2024","sd":"04/08/2024","cd":"2025-03-25","lat":12.55944,"lon":123.73889,"sm":1295,"fm":1295,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calipat-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5564},{"i":7201,"cid":"22KI0040","pid":"P00631094MN","t":"Construction of Flood Control Structure, Barangay Carmen, Jimenez, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"JIMENEZ (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"RJLG CONSTRUCTION AND SUPPLIES","c":4949866.03,"abc":4950000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-05-31","lat":8.32579,"lon":123.739263,"sm":669,"fm":669,"tm":669,"am":669,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carmen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5565},{"i":7202,"cid":"22FA0045","pid":"P00631325LZ","t":"Construction of Flood Control at Barangay Calbayog and Barangay San Roque, Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":44100000.0,"abc":53899992.32,"fy":"2022","sd":"08/05/2022","cd":"2023-01-29","lat":13.28868,"lon":123.73933,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calbayog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5566},{"i":7203,"cid":"23FA0037","pid":"P00740495LZ","t":"Construction/Extension of Fatima Seawall, (Phase 2) Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3RB CONSTRUCTION & SUPPLY","c":96500000.0,"abc":96499997.35,"fy":"2023","sd":"05/26/2023","cd":"2024-02-22","lat":13.350278,"lon":123.739455,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5567},{"i":7204,"cid":"23FA0036","pid":"P00727201LZ","t":"Construction/ Extension of San Lorenzo Seawall, (Phase IV) Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY) / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":29400000.0,"abc":75459988.26,"fy":"2023","sd":"05/15/2023","cd":"2023-11-06","lat":13.342467,"lon":123.739986,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5568},{"i":7205,"cid":"22FB0024","pid":"P00620685LZ","t":"Upgrading of River Bank Protection Works along Homapon River, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"TWINCARE BUILDERS INC. / JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":40192116.94,"abc":40218604.29,"fy":"2022","sd":"02/21/2022","cd":"2022-08-08","lat":13.09807,"lon":123.739997,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Homapon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5569},{"i":7206,"cid":"23H00040","pid":"P00721545VS","t":"Construction of Mancilang-Malbago Seawall, Malbago, Madridejos, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MADRIDEJOS (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION / ROVILLA CONSTRUCTION","c":96493655.55,"abc":96500000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-14","lat":11.298958,"lon":123.740395,"sm":859,"fm":859,"tm":859,"am":859,"md":0.28,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5570},{"i":7207,"cid":"23FA0057","pid":"P00740496LZ","t":"Construction/Extension of Salvacion Seawall (Phase 4), Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":96500000.0,"abc":96499998.97,"fy":"2023","sd":"08/23/2023","cd":"2024-04-21","lat":13.341214,"lon":123.740536,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5571},{"i":7208,"cid":"23HN0128","pid":"P00733264VS","t":"Construction of Flood Control Structure along Butuanon River Upstream, Barangay Maguikay, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96398888.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-11-29","lat":10.342084,"lon":123.947243,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34202,123.94722],"wst":"matched","br":"Maguikay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5572},{"i":7209,"cid":"24HG0006","pid":"P00820066VS","t":"Construction of Langtad, Argao Flood Control (Downstream), Barangay Langtad, Argao, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ARGAO (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":64575000.0,"abc":64655000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-12-30","lat":9.887183,"lon":123.607225,"sm":72,"fm":72,"tm":72,"am":72,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Langtad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5573},{"i":7210,"cid":"22FK0062","pid":"P00640591LZ","t":"Construction of Bagalayag Seawall, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":19799984.31,"abc":49499987.41,"fy":"2022","sd":"04/04/2022","cd":"2023-05-05","lat":12.936035,"lon":123.878033,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5574},{"i":7211,"cid":"24HI0062","pid":"P00821056VS","t":"Construction of Flood Control Structure along Bawo River, Sogod, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SOGOD (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":48964040.18,"abc":49000000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-10-10","lat":10.7285,"lon":124.005963,"sm":1474,"fm":1474,"tm":1474,"am":356,"md":0.01,"ls":"boundary","ww":"Bawo","wn":"Bawo River","wd":0.0,"wp":[10.72848,124.00597],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5575},{"i":7212,"cid":"24HI0002","pid":"P00820055VS","t":"Construction of Flood Control Structure along Naghalin River (Upstream), Catmon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CATMON (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":72367100.6,"abc":72375000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-11","lat":10.718382,"lon":124.008378,"sm":356,"fm":356,"tm":356,"am":356,"md":0.0,"ls":"inside","ww":"Naghalin","wn":"Naghalin River","wd":0.0,"wp":[10.71838,124.00838],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5576},{"i":7213,"cid":"22FK0034","pid":"P00620759LZ","t":"Construction of Flood Mitigation Structure of Malbog River Control Donwstream, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":37586374.39,"abc":39199979.11,"fy":"2022","sd":"03/11/2022","cd":"2022-10-12","lat":12.977154,"lon":123.801375,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Malbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5577},{"i":7214,"cid":"23FK0030","pid":"P00742193LZ","t":"Construction of River Control at Sitio Gayong, Brgy. Sto Niño, Bacon District, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":69206320.09,"abc":69299990.63,"fy":"2023","sd":"04/19/2023","cd":"2024-01-24","lat":13.106547,"lon":123.947605,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5578},{"i":7215,"cid":"22F00139","pid":"P00620321LZ","t":"Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752.00 - Sta. 24+575.57 Left Side, Sta. 23+806.50 - Sta. 24+357.50 Right Side, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":174378350.7,"abc":174378350.7,"fy":"2022","sd":"05/12/2022","cd":"2023-05-31","lat":12.710595,"lon":124.00907,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.17,"wp":[12.71053,124.0075],"wst":"matched","br":null,"len":1374.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5579},{"i":7216,"cid":"22HO0060","pid":"P00633231VS","t":"Construction of Waterway along Manlapay River (Section 1), Dumanjug, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48508289.02,"abc":48508289.02,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":10.05332,"lon":123.493308,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Manlapay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5580},{"i":7217,"cid":"23FL0007","pid":"P00725895LZ","t":"Construction of Golpeo Street Flood Control Project, Managanaga-Zone 7 Phase 1, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-08-18","lat":12.67152,"lon":123.87828,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5581},{"i":7218,"cid":"22FO0103","pid":"P00640475LZ","t":"Construction of Revetment along San Francisco River, Guinobatan, Albay","w":"Construction of Revetment","rg":"Region V","pv":"ALBAY","mu":"GUINOBATAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":98999988.18,"abc":99000000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-20","lat":13.188917,"lon":123.611972,"sm":603,"fm":603,"tm":603,"am":603,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.69,"wp":[13.18908,123.60559],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5582},{"i":7219,"cid":"24HE0066","pid":"P00835007VS","t":"Construction of Drainage Brgy. Calajo-an, Municipality of Minglanilla, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"MINGLANILLA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"CARCEL CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4940000.0,"abc":4950000.0,"fy":"2024","sd":"04/29/2024","cd":"2024-10-25","lat":10.249284,"lon":123.803206,"sm":979,"fm":979,"tm":979,"am":979,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calajo-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5583},{"i":7220,"cid":"23HN0050","pid":"P00721831VS","t":"Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Alang-Alang, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":39150000.0,"abc":39200000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-10-05","lat":10.341349,"lon":123.948461,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34145,123.94849],"wst":"matched","br":"Alang-Alang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5584},{"i":7221,"cid":"22FO0102","pid":"P00640473LZ","t":"Construction of Flood Mitigation Structure along Cabangan River (Upstream Right Side Of Cabangan Bridge), Basud, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":96029543.42,"abc":99000000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-06-17","lat":13.27,"lon":123.494,"sm":1157,"fm":1157,"tm":1157,"am":1031,"md":0.61,"ls":"boundary","ww":"Cabangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":402},{"i":7222,"cid":"21FM0038","pid":"P00525701LZ","t":"Construction of Sitio Dalakit Shore Protection, Sitio Dalakit, Barangay McArthur, Monreal, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"Monreal","deo":"Masbate 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / L BROS CONSTRUCTION AND SUPPLY INC (FORMERLY: L BROS. CONSTRUCTION & SUPPLY)","c":50425248.21,"abc":53075000.0,"fy":"2021","sd":"11/23/2021","cd":"2022-11-29","lat":12.643889,"lon":123.612222,"sm":988,"fm":null,"tm":988,"am":988,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"McArthur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5585},{"i":7223,"cid":"24HI0001","pid":"P00820057VS","t":"Construction of Flood Control Structure along Panalipan River (Upstream), Catmon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CATMON (CEBU)","deo":"Cebu 5th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":71630987.97,"abc":72375000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-11","lat":10.645052,"lon":124.011021,"sm":356,"fm":356,"tm":356,"am":356,"md":0.0,"ls":"inside","ww":"Panalipan","wn":"Panalipan River","wd":0.05,"wp":[10.64554,124.01096],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5586},{"i":7224,"cid":"22FK0053","pid":"P00640595LZ","t":"Construction of Poblacion Seawall, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":19799962.19,"abc":49499989.68,"fy":"2022","sd":"04/04/2022","cd":"2023-02-24","lat":12.947003,"lon":123.878468,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5587},{"i":7225,"cid":"24KG0018","pid":"P00821087MN","t":"Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Bulod Bridge (B00960MN), Upstream (R/S), Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"01/23/2024","cd":"2024-09-24","lat":8.04978,"lon":123.80526,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5588},{"i":7226,"cid":"22FG0019","pid":"P00620315LZ","t":"Construction/Improvement of Flood Control Structure along Rangas River, Sta. 0+053 - Sta. 0+903.5 (downstream - Left Side), Sta. 0+034 - Sta. 0+903.5 (downsteam - Right Side), Matacla, Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":78168860.0,"abc":78168860.0,"fy":"2022","sd":"04/05/2022","cd":"2023-04-13","lat":13.681387,"lon":123.495422,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.17,"wp":[13.68014,123.4963],"wst":"matched","br":null,"len":1720.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5589},{"i":7227,"cid":"23FK0031","pid":"P00742484LZ","t":"Construction of River Bank Protection Works along Gayong River, Brgy. Sto. Nino, Bacon District, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":49493043.02,"abc":49499985.92,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":13.105489,"lon":123.948748,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Gayong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sto. Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5590},{"i":7228,"cid":"22FO0060","pid":"P00631381LZ","t":"Rehabilitation of Travesia Flood Control (Phase II), Guinobatan, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"GUINOBATAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":39199999.71,"abc":97100000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-07-15","lat":13.19406,"lon":123.61482,"sm":603,"fm":603,"tm":603,"am":603,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5591},{"i":7229,"cid":"23FK0106","pid":"P00725896LZ","t":"Construction/Rehabilitation of Drainage System at Brgy. Balogo, Sorsogon City","w":"Construction of Drainage Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":96499897.52,"abc":96499986.55,"fy":"2023","sd":"08/31/2023","cd":"2024-06-25","lat":12.975698,"lon":124.011307,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balogo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5592},{"i":7230,"cid":"23FJ0021","pid":"P00726304LZ","t":"Construction of Flood Control Concrete Revetment at Gaid River, Upstream Leftside, Barangay Gaid, Sta. 0+634.00 - Sta. 0+796.00, Dimasalang, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":38786902.99,"abc":39000160.77,"fy":"2023","sd":"05/12/2023","cd":"2023-09-25","lat":12.176237,"lon":123.87855,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":"Gaid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gaid","len":162.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5593},{"i":7231,"cid":"24KJ0106","pid":"P00835870MN","t":"Construction of Dinas Drainage Structure, Sinacaban, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"SINACABAN (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"WEISENWORK CONSTRUCTION","c":4752999.57,"abc":4900000.0,"fy":"2024","sd":"06/20/2024","cd":"2024-11-25","lat":8.308679,"lon":123.805423,"sm":1459,"fm":1459,"tm":1459,"am":1459,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5594},{"i":7232,"cid":"23FA0034","pid":"P00740499LZ","t":"Construction/Extension of San Lorenzo Seawall (Phase 3), Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":96500000.0,"abc":118739934.6,"fy":"2023","sd":"05/15/2023","cd":"2024-03-06","lat":13.339268,"lon":123.740634,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5595},{"i":7233,"cid":"23HH0125","pid":"P00732026VS","t":"Construction of Flood Mitigation Structure, Barangay Labangon, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BELCONSTRUCT CORPORATION","c":4938694.26,"abc":4950000.0,"fy":"2023","sd":"10/17/2023","cd":"2024-02-17","lat":10.306198,"lon":123.879074,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5596},{"i":7234,"cid":"22HN0070","pid":"P00633228VS","t":"Rehabilitation of Drainage with Sidewalk at G. Ouna St., Alang Alang Mandaue City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":null,"deo":"Cebu 6th District Engineering Office","co":"PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION)","c":4939949.55,"abc":4950000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-07-08","lat":10.332818,"lon":123.949115,"sm":null,"fm":null,"tm":null,"am":915,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":152},{"i":7235,"cid":"23FL0048","pid":"P00725905LZ","t":"Rehabilitation/ Improvement of Flood Protection Measures along Cogon River, Irosin, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":115793368.5,"abc":115800000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-05-17","lat":12.753454,"lon":124.01398,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cogon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5597},{"i":7236,"cid":"24FA0018","pid":"P00823641LZ","t":"Construction of Flood Control (Road Dike) protecting Maynonong Elementary School, Tiwi, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"TIWI (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":62725000.0,"abc":62724192.45,"fy":"2024","sd":"04/19/2024","cd":"2024-11-11","lat":13.497333,"lon":123.6161,"sm":1574,"fm":1574,"tm":1574,"am":1574,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5598},{"i":7237,"cid":"22HF0048","pid":"P00630226VS","t":"Construction of Flood Mitigation Structure at Langoyon River, Barangay Poblacion 8 Side, Upstream and Downstream, Sta. 2+320 - 2+519, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY) / JUGA BUILDERS & CONSTRUCTION SUPPLY","c":24364998.06,"abc":24500000.0,"fy":"2022","sd":"07/01/2022","cd":"2023-01-01","lat":10.721415,"lon":123.805799,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion 8 Side","len":199.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5599},{"i":7238,"cid":"22F00007","pid":"P00630973LZ","t":"Construction of Flood Mitigation Structure along Managa-Naga River, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":67549794.35,"abc":67549794.35,"fy":"2022","sd":"04/08/2022","cd":"2023-05-21","lat":12.672994,"lon":123.87917,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Managa-Naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5600},{"i":7239,"cid":"22F00111","pid":"P00620284LZ","t":"Construction of Flood Control Structure along Culasi River (Package I), Brgys. Matacla, Bagumbayan Grande, San Juan Evangelista, San Jose and San Benito, Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":91648653.09,"abc":91648653.09,"fy":"2022","sd":"03/24/2022","cd":"2023-04-16","lat":13.702317,"lon":123.495426,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Culasi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5601},{"i":7240,"cid":"23KJ0021","pid":"P00721379MN","t":"Construction of Slope Protection (Downstream) of Migcanaway Bridge I along Ozamiz - Pagadian Road, Tangub City, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47530000.0,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2024-12-22","lat":8.076236,"lon":123.740718,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5602},{"i":7241,"cid":"22HD0030","pid":"P00620118VS","t":"Construction of Flood Control Structure along Sapang Dako River, Sta. 0+000 - Sta. 0+774, Barangay Calambua, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN REMIGIO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-30","lat":10.903543,"lon":123.949201,"sm":1355,"fm":1355,"tm":1355,"am":1355,"md":0.0,"ls":"inside","ww":"Sapang Dako","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calambua","len":774.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5603},{"i":7242,"cid":"22FL0023","pid":"P00631479LZ","t":"Rehabilitation of Revetment along Cadac-an River, Brgy. Macawayan Section, Irosin, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":37621089.23,"abc":39200000.0,"fy":"2022","sd":"03/15/2022","cd":"2022-12-26","lat":12.70441,"lon":124.01555,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.01,"wp":[12.70435,124.01555],"wst":"matched","br":"Macawayan Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5604},{"i":7243,"cid":"23HE0093","pid":"P00721670VS","t":"Construction of Drainage System along Sibonga-Dumanjug Road, K0051 + (-450) - K0051 + (-050), Sibonga, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"SIBONGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"647 CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4850000.0,"abc":4900000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-29","lat":10.016356,"lon":123.616398,"sm":1444,"fm":1444,"tm":1444,"am":1444,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5605},{"i":7244,"cid":"23FJ0023","pid":"P00727225LZ","t":"Construction of Pinangapugan Flood Control, Sta. 0+000.00 - Sta. 0+146.00, Upstream Right Side, Barangay Quezon, Uson, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"RED DIAMOND CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: RED DIAMOND CONSTRUCTION)","c":31162943.24,"abc":31171010.57,"fy":"2023","sd":"04/18/2023","cd":"2023-09-11","lat":12.189699,"lon":123.80593,"sm":1618,"fm":1618,"tm":1618,"am":1618,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quezon","len":146.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5606},{"i":7245,"cid":"24FG0051","pid":"P00844790LZ","t":"Construction of Flood Mitigation Structure along Burabod Creek, Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TIGAON (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-12-06","lat":13.635701,"lon":123.495822,"sm":1564,"fm":1564,"tm":1564,"am":1564,"md":0.0,"ls":"inside","ww":"Burabod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5607},{"i":7246,"cid":"22FB0128","pid":"P00639543LZ","t":"Construction of River Bank Protection Works and Drainage System along Brgy. Taysan River Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"WELEX CONSTRUCTION, INCORPORATED (FORMERLY WELEX C","c":48999560.94,"abc":48999805.42,"fy":"2022","sd":"04/11/2022","cd":"2022-09-15","lat":13.112245,"lon":123.740767,"sm":768,"fm":768,"tm":null,"am":768,"md":0.0,"ls":"inside","ww":"Brgy. Taysan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Taysan River Legazpi City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5608},{"i":7247,"cid":"23HN0092","pid":"P00721978VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Polog, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-11-28","lat":10.402062,"lon":123.950751,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5609},{"i":7248,"cid":"23FJ0022","pid":"P00727224LZ","t":"Construction of Gaid Flood Control, Sta. 0+796.00 - Sta. 0+937.00, Upstream Left Side, Barangay Gaid, Dimasalang, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"GACT ENTERPRISES","c":37198373.92,"abc":37208477.29,"fy":"2023","sd":"06/09/2023","cd":"2024-02-06","lat":12.176363,"lon":123.879588,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gaid","len":141.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5610},{"i":7249,"cid":"22K00092","pid":"P00620037MN","t":"Construction of Flood Mitigation Structure along Bulod River, Package 1, Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"KOUZBARY BUILDERS / LANAO BUILDER AND ENTERPRISES","c":93088514.16,"abc":96500000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-11-06","lat":8.05447,"lon":123.80655,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":"Bulod","wn":"Bulod River","wd":0.02,"wp":[8.05436,123.80673],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5611},{"i":7250,"cid":"22FK0062","pid":"P00640593LZ","t":"Construction of Box Culvert (Aling going to Banban ), Donsol, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":4949981.04,"abc":49499987.41,"fy":"2022","sd":"04/04/2022","cd":"2023-05-05","lat":12.98149,"lon":123.6173,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5612},{"i":7251,"cid":"23FI0017","pid":"P00725888LZ","t":"Construction of Flood Control System along Batuila River, Sta. 0+143.40 - Sta. 0+323.40 (Upstream, Both Sides), Baleno, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"BALENO (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":51145000.0,"abc":51144977.9,"fy":"2023","sd":"04/05/2023","cd":"2023-07-28","lat":12.456875,"lon":123.495935,"sm":126,"fm":126,"tm":126,"am":126,"md":0.0,"ls":"inside","ww":"Batuila","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":180.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5613},{"i":7252,"cid":"21F00008","pid":"P00526343LZ","t":"Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"Irosin","deo":"Sorsogon 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":144750000.0,"abc":289499939.2,"fy":"2021","sd":"05/24/2021","cd":"2022-10-06","lat":12.70434,"lon":124.015768,"sm":649,"fm":null,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.0,"wp":[12.70434,124.01577],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5614},{"i":7253,"cid":"22FB0096","pid":"P00632700LZ","t":"Rehabilitation of Bilbao Shore Protection Structure (Phase 2), Rapu-Rapu, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"RAPU-RAPU (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":69294242.44,"abc":69294868.52,"fy":"2022","sd":"03/16/2022","cd":"2022-10-26","lat":13.335529,"lon":123.741116,"sm":1201,"fm":1201,"tm":1201,"am":423,"md":18.92,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":18.92,"text":"The pin is 18.9 km outside Rapu-Rapu, Albay, the nearest municipality the record claims. It falls in City of Tabaco, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":151},{"i":7254,"cid":"23HN0088","pid":"P00722001VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"NEOVENTURES CONSTRUCTION","c":8067898.81,"abc":8073240.0,"fy":"2023","sd":"03/08/2023","cd":"2023-06-27","lat":10.401768,"lon":123.951002,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5615},{"i":7255,"cid":"22FJ0019","pid":"P00620750LZ","t":"Construction of Flood Control Concrete Revetment at Pinangapugan River, Brgy. Quezon Uson, Masbate","w":"Construction of Revetment","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":35260510.32,"abc":35279548.2,"fy":"2022","sd":"02/16/2022","cd":"2022-09-12","lat":12.18947,"lon":123.80666,"sm":1618,"fm":1618,"tm":404,"am":1618,"md":0.0,"ls":"inside","ww":"Pinangapugan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quezon Uson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":22.43,"text":"The record contradicts itself: the municipality field and the pin point to Uson, Masbate, but the title names City of Masbate, Masbate, 22 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":572},{"i":7256,"cid":"24FA0010","pid":"P00820991LZ","t":"Construction of Joroan River Control (Downstream), Tiwi, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"TIWI (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":39200000.0,"abc":39199999.48,"fy":"2024","sd":"02/13/2024","cd":"2024-07-21","lat":13.491789,"lon":123.618852,"sm":1574,"fm":1574,"tm":1574,"am":1574,"md":0.0,"ls":"inside","ww":"Joroan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5616},{"i":7257,"cid":"21FI0038","pid":"P00561437LZ","t":"Construction of Flood Control System, Batuila River, Brgy. Batuila,  Baleno, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"Baleno","deo":"Masbate 2nd District Engineering Office","co":"EBARAM GENERAL CONSTRUCTION & SUPPLY","c":9900000.0,"abc":9899940.55,"fy":"2021","sd":"10/19/2022","cd":"2022-12-30","lat":12.456674,"lon":123.4961,"sm":126,"fm":null,"tm":126,"am":126,"md":0.0,"ls":"inside","ww":"Batuila","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batuila","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5617},{"i":7258,"cid":"22HI0018","pid":"P00620028VS","t":"Construction of Flood Control Structure along Panalipan River, Catmon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CATMON (CEBU)","deo":"Cebu 5th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":86774888.0,"abc":86850000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-12-01","lat":10.646235,"lon":124.016256,"sm":356,"fm":356,"tm":356,"am":356,"md":0.0,"ls":"inside","ww":"Panalipan","wn":"Panalipan River","wd":0.03,"wp":[10.64603,124.01637],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5618},{"i":7259,"cid":"24FA0017","pid":"P00823649LZ","t":"Construction of San Lorenzo Seawall (Phase 5), Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":104220000.0,"abc":104219999.5,"fy":"2024","sd":"04/17/2024","cd":"2025-02-26","lat":13.333553,"lon":123.741116,"sm":423,"fm":423,"tm":423,"am":895,"md":0.16,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5619},{"i":7260,"cid":"23HE0094","pid":"P00721542VS","t":"Construction of Seawall protecting Regional Mobile Force Batallion 7 at Camp Cederino Genovia, Barangay Bahay, Sibonga, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SIBONGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"JANUARY BUILDERS","c":53060000.0,"abc":53075000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-19","lat":10.008642,"lon":123.620079,"sm":1444,"fm":1444,"tm":1444,"am":1444,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bahay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5620},{"i":7261,"cid":"23FK0011","pid":"P00726321LZ","t":"Construction of Flood Protection Measures along Cawayan River, Brgy. Gimaloto and Brgy. Barayong, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":38006678.27,"abc":39199987.79,"fy":"2023","sd":"02/22/2023","cd":"2023-09-18","lat":12.968041,"lon":123.952606,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Cawayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gimaloto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5621},{"i":7262,"cid":"22HD0025","pid":"P00620117VS","t":"Construction of Flood Control Structure along Bongon River, Tabuelan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TABUELAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-09-12","lat":10.823268,"lon":123.880368,"sm":1506,"fm":1506,"tm":1506,"am":1506,"md":0.0,"ls":"inside","ww":"Bongon","wn":"Bo-ongon River","wd":0.03,"wp":[10.82302,123.88018],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5622},{"i":7263,"cid":"23FJ0024","pid":"P00726309LZ","t":"Construction of Pinangapugan Flood Control, Sta. 0+146.00 - Sta. 0+286.00, Upstream Right Side, Barangay Quezon, Uson, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"EJ CANTORIA CONSTRUCTION & SUPPLY","c":29786118.31,"abc":29794664.26,"fy":"2023","sd":"04/18/2023","cd":"2023-09-25","lat":12.18902,"lon":123.807047,"sm":1618,"fm":1618,"tm":1618,"am":1618,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quezon","len":140.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5623},{"i":7264,"cid":"22F00142","pid":"P00631480LZ","t":"Rehabilitation of Revetment along Managa-Naga River, Bulan, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":43424539.68,"abc":43424539.68,"fy":"2022","sd":"04/08/2022","cd":"2023-04-13","lat":12.680594,"lon":123.880664,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Managa-Naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5624},{"i":7265,"cid":"23FG0043","pid":"P00726985LZ","t":"Construction of Flood Mitigation Structure along Sagñay River, Sagñay, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TINAMBAC (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":93123700.0,"abc":93123700.0,"fy":"2023","sd":"03/30/2023","cd":"2023-12-18","lat":13.680057,"lon":123.496519,"sm":1235,"fm":1567,"tm":1235,"am":590,"md":6.56,"ls":"outside","ww":"Sagñay","wn":"Sagñay River","wd":9.04,"wp":[13.60461,123.52868],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":71,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.56,"text":"The pin is 6.6 km outside Sagñay, Camarines Sur, the nearest municipality the record claims. It falls in Goa, Camarines Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":9.04,"text":"The title names Sagñay, which OpenStreetMap maps through the stated municipality, but the pin is 9.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":50},{"i":7266,"cid":"22HC0068","pid":"P00630216VS","t":"Construction of Seawall, Brgy Bonbon, Clarin, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CLARIN (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"SLP CONSTRUCTION","c":13900320.0,"abc":19600000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-12-25","lat":9.964652,"lon":124.018047,"sm":439,"fm":439,"tm":439,"am":439,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonbon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5625},{"i":7267,"cid":"22FB0151","pid":"P00639542LZ","t":"Construction of River Bank Protection Works and Drainage System along Brgy. Dita River Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"RAPIDWORKZ CONSTRUCTION & SUPPLY","c":19597880.84,"abc":19599998.21,"fy":"2022","sd":"04/11/2022","cd":"2022-09-04","lat":13.189635,"lon":123.74242,"sm":768,"fm":768,"tm":null,"am":768,"md":0.0,"ls":"inside","ww":"Brgy. Dita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dita River Legazpi City","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5626},{"i":7268,"cid":"21F00029","pid":"P00525691LZ","t":"Rehabilitation/Improvement of Joroan Flood Control (Upstream and Downstream of Joroan Bridge #1 and Bridge #2 ), Tiwi, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Tiwi","deo":"Albay 1st District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":120624912.8,"abc":120624912.8,"fy":"2021","sd":"02/15/2022","cd":"2022-12-08","lat":13.491423,"lon":123.620544,"sm":1574,"fm":null,"tm":1574,"am":1574,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5627},{"i":7269,"cid":"23KG0023","pid":"P00721252MN","t":"Construction of Flood Mitigation Structure along Maigo Bridge (B00949MN), Downstream (R/S), Maigo, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-10-24","lat":8.159169,"lon":123.952656,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5628},{"i":7270,"cid":"24FO0017","pid":"P00820491LZ","t":"Construction of Maninila River (Barangay Maninila - Barangay Masarawag) Flood Mitigation System, Guinobatan, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"GUINOBATAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"WCS CONSTRUCTION, INC.","c":102290000.0,"abc":102290000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-30","lat":13.21535,"lon":123.62214,"sm":603,"fm":603,"tm":603,"am":603,"md":0.0,"ls":"inside","ww":"Maninila","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Maninila","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5629},{"i":7271,"cid":"22K00093","pid":"P00620038MN","t":"Construction of Flood Mitigation Structure along Bulod River, Package 2, Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"KOUZBARY BUILDERS / LANAO BUILDER AND ENTERPRISES","c":139725176.6,"abc":144750000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-10-03","lat":8.05594,"lon":123.8074,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":"Bulod","wn":"Bulod River","wd":0.03,"wp":[8.05596,123.80715],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5630},{"i":7272,"cid":"24FL0010","pid":"P00839678LZ","t":"Construction of Flood Mitigation Structure, Barangay Pange, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"GDBS BUILDERS AND ENTERPRISE","c":4850574.82,"abc":9900000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-04-25","lat":12.63969,"lon":124.01847,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pange","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5631},{"i":7273,"cid":"24FN0013","pid":"P00820498LZ","t":"Construction of Riverbank Protection Structure along Barit River, Barangay Lourdes Section, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-12-16","lat":13.42196,"lon":123.4975,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.42201,123.49745],"wst":"matched","br":"Lourdes Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5632},{"i":7274,"cid":"21FB0104","pid":"P00526197LZ","t":"Construction of Flood Control and Drainage System, Purok 2 Gogon, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION","c":34298212.71,"abc":34298406.91,"fy":"2021","sd":"03/02/2022","cd":"2022-08-04","lat":13.15234,"lon":123.74305,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5633},{"i":7275,"cid":"24HN0075","pid":"P00834650VS","t":"Construction of Drainage System along R. A. Ouano Road, Barangay Opao, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"A.S.T BUILDERS","c":9774508.23,"abc":9800000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-01","lat":10.330563,"lon":123.953082,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Opao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5634},{"i":7276,"cid":"21FM0037","pid":"P00525702LZ","t":"Construction of Sitio Guiwanon Shore Protection, Sitio Guiwanon, Barangay Danao, San Jacinto, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"San Jacinto","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":51456790.87,"abc":53075000.0,"fy":"2021","sd":"11/23/2021","cd":"2022-11-29","lat":12.56901,"lon":123.6224,"sm":1295,"fm":null,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Danao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5635},{"i":7277,"cid":"23HH0118","pid":"P00732023VS","t":"Construction of Flood Mitigation Structure, Barangay Guadalupe, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BELCONSTRUCT CORPORATION","c":4940079.39,"abc":4950000.0,"fy":"2023","sd":"08/23/2023","cd":"2023-12-24","lat":10.332178,"lon":123.881288,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guadalupe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5636},{"i":7278,"cid":"23HF0031","pid":"P00721825VS","t":"Construction of Flood Mitigation Structure at Caridad River, Barangay Caridad - Barangay Jagbuaya, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":44015442.55,"abc":44100000.0,"fy":"2023","sd":"02/02/2023","cd":"2023-08-30","lat":10.685399,"lon":123.808268,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Caridad","wn":"Caridad River","wd":0.07,"wp":[10.68598,123.80799],"wst":"matched","br":"Caridad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5637},{"i":7279,"cid":"23HC0052","pid":"P00721664VS","t":"Construction of Bonbon Seawall, Phase II, Clarin, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CLARIN (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"SLP CONSTRUCTION / YS CONSTRUCTION","c":48999862.87,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-12-27","lat":9.964526,"lon":124.018566,"sm":439,"fm":439,"tm":439,"am":439,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5638},{"i":7280,"cid":"22F00183","pid":"P00640479LZ","t":"Rehabilitation of Flood Mitigation Structure along Dorong-an River, Brgy. Bagahanglad, San Jacinto, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"SAN JACINTO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98999139.6,"abc":98999139.6,"fy":"2022","sd":"08/11/2022","cd":"2023-09-01","lat":12.528294,"lon":123.743097,"sm":1295,"fm":1295,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":"Dorong-an","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagahanglad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5639},{"i":7281,"cid":"23FN0029","pid":"P00740492LZ","t":"Construction of Bank Protection Structure, Brgy. Salvacion-Sagrada Familia, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":81909707.57,"abc":81911222.0,"fy":"2023","sd":"04/11/2023","cd":"2024-03-04","lat":13.42411,"lon":123.4985,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salvacion-Sagrada Familia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5640},{"i":7282,"cid":"23KJ0031","pid":"P00721381MN","t":"Construction of Slope Protection Downstream of Malubog Bridge I along Labuyo-Tangub-Silanga Road, Tangub City, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47530000.0,"abc":49000000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-10-30","lat":8.061634,"lon":123.743388,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5641},{"i":7283,"cid":"23FK0039","pid":"P00742489LZ","t":"Construction of Flood Mitigation Structure of Brgy. Incarizan Flood Control, Magallanes, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MAGALLANES (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":49499987.99,"abc":98999982.07,"fy":"2023","sd":"04/12/2023","cd":"2024-02-21","lat":12.84111,"lon":123.8817,"sm":862,"fm":862,"tm":862,"am":862,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Incarizan Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5642},{"i":7284,"cid":"23HN0089","pid":"P00721540VS","t":"Construction of Flood Control Structure along Jagobiao, Barangay Casili, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R / XLA CONSTRUCTION","c":86789658.38,"abc":86850000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-06","lat":10.370196,"lon":123.953091,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Casili","len":null,"ph":null,"dup":[7290],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,579,279.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":105},{"i":7285,"cid":"24HE0055","pid":"P00820356VS","t":"Construction of Ocaña River Flood Control Structure, Carcar City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF CARCAR (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS / AR ADLAWAN CONSTRUCTION","c":120625000.0,"abc":120625000.0,"fy":"2024","sd":"02/22/2024","cd":"2025-01-03","lat":10.068071,"lon":123.630995,"sm":379,"fm":379,"tm":379,"am":379,"md":0.0,"ls":"inside","ww":"Ocaña","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5643},{"i":7286,"cid":"22HF0040","pid":"P00634053VS","t":"Construction of Flood Mitigation Structure at Langoyon River, Barangay Mangga, Sta. 0+607 - Sta. 0+916, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48049193.6,"abc":48618400.0,"fy":"2022","sd":"05/24/2022","cd":"2023-01-24","lat":10.719836,"lon":123.808758,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangga","len":309.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5644},{"i":7287,"cid":"22FL0018","pid":"P00631473LZ","t":"Construction of Flood Control Structure in Monbon, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":28518000.0,"abc":58800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-10-13","lat":12.73196,"lon":124.02029,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5645},{"i":7288,"cid":"22FG0049","pid":"P00632969LZ","t":"Construction of Flood Mitigation Structure, Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"JO20 CONSTRUCTION AND SUPPLY","c":10395000.0,"abc":10395000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-08-01","lat":13.632115,"lon":123.498755,"sm":1564,"fm":736,"tm":1564,"am":1564,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.15,"text":"The record contradicts itself: the title and the pin point to Tigaon, Camarines Sur, but the municipality field names Lagonoy, Camarines Sur, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":614},{"i":7289,"cid":"23FB0112","pid":"P00740444LZ","t":"Construction of Dike and Drainage Structure along Barangay 15, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JEJAN CONSTRUCTION AND SUPPLY(FOR. JEJAN CONSTRUCT / STEVEN CONSTRUCTION & SUPPLY","c":72271706.58,"abc":72272653.25,"fy":"2023","sd":"04/19/2023","cd":"2023-10-31","lat":13.134101,"lon":123.743945,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"15","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5646},{"i":7290,"cid":"23HN0090","pid":"P00721900VS","t":"Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili, Mandaue City, Cebu, Phase 2","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"PHIL ASIA RESOURCES & DEVELOPMENT CORP. / WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":57789620.79,"abc":57900000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-11-10","lat":10.370196,"lon":123.953091,"sm":915,"fm":915,"tm":362,"am":453,"md":0.01,"ls":"boundary","ww":"Jagobiao","wn":"Jagobiao Creek","wd":0.01,"wp":[10.37013,123.95309],"wst":"matched","br":"Casili","len":null,"ph":"Phase 2","dup":[7284],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 144,579,279.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":137},{"i":7291,"cid":"22HF0095","pid":"P00620126VS","t":"Construction of Slope Protection Structure at Langoyon River, Barangay Poblacion 8, Upstream, Sta. 2 + 520 - Sta. 2 + 721, Tuburan, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48941933.27,"abc":49000000.0,"fy":"2022","sd":"10/11/2022","cd":"2023-09-01","lat":10.7213,"lon":123.80915,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion 8","len":201.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5647},{"i":7292,"cid":"22FL0020","pid":"P00631475LZ","t":"Construction of Revetment Wall along Cadac-an River, Barangay Buenavista, Macawayan-Batang Section, Irosin, Sorsogon","w":"Construction of Revetment","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48999998.36,"abc":49000000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-04-01","lat":12.695558,"lon":124.021008,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.39,"wp":[12.69909,124.02046],"wst":"matched","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5648},{"i":7293,"cid":"23FB0027","pid":"P00737381LZ","t":"Construction of Road Dike Structure along Tagaytay-Libod River, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION)","c":67548527.29,"abc":67548539.34,"fy":"2023","sd":"02/27/2023","cd":"2023-09-14","lat":13.170113,"lon":123.632707,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Tagaytay-Libod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5649},{"i":7294,"cid":"22FB0007","pid":"P00631345LZ","t":"Construction of Tumpa Flood Control Dike, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / 3RB CONSTRUCTION & SUPPLY","c":48997990.88,"abc":48998323.83,"fy":"2022","sd":"02/21/2022","cd":"2022-07-15","lat":13.201708,"lon":123.634291,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5650},{"i":7295,"cid":"24HO0080","pid":"P00834597VS","t":"Construction of Revetment Wall at Valencia River (Upstream Left Side), Phase 3, Alegria, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":57896315.2,"abc":57896715.2,"fy":"2024","sd":"02/26/2024","cd":"2024-06-13","lat":9.748346,"lon":123.38907,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 3","dup":[6986,6991],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":2,"text":"2 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 250,603,089.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1089},{"i":7296,"cid":"23HH0096","pid":"P00721687VS","t":"Construction of Flood Mitigation Structure along Guadalupe River, Barangay Kalunasan, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES","c":48900270.0,"abc":49000000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-03-01","lat":10.33161,"lon":123.882105,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Guadalupe","wn":"Guadalupe River","wd":0.01,"wp":[10.33151,123.88205],"wst":"matched","br":"Kalunasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5651},{"i":7297,"cid":"23FG0041","pid":"P00742478LZ","t":"Construction of Flood Mitigation Structure along Burabod Creek, Tigaon, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"TIGAON (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":47768100.0,"abc":47768100.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-20","lat":13.635015,"lon":123.4998,"sm":1564,"fm":1564,"tm":1564,"am":1564,"md":0.0,"ls":"inside","ww":"Burabod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5652},{"i":7298,"cid":"23FB0109","pid":"P00740673LZ","t":"Construction of River Bank Protection Works and Drainage System in Brgy. 15 - 18, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":34299587.13,"abc":34279617.23,"fy":"2023","sd":"04/10/2023","cd":"2023-09-20","lat":13.13885,"lon":123.7447,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"15","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5653},{"i":7299,"cid":"22KF0024","pid":"P00620044MN","t":"Construction of Slope Protection along Maigo Bridge, (downstream) (LS), Sta. 0+000.00 - Sta. 0+260.00, Maigo, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-01-09","lat":8.15755,"lon":123.95311,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":260.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5654},{"i":7300,"cid":"22FL0038","pid":"P00630964LZ","t":"Construction of Flood Control Structure along Barangay Calomagon River, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":56163261.31,"abc":57900000.0,"fy":"2022","sd":"05/27/2022","cd":"2023-03-02","lat":12.703811,"lon":123.882322,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Barangay Calomagon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calomagon River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5655},{"i":7301,"cid":"23HI0065","pid":"P00744362VS","t":"Rehabilitation of FC Structure along Luyang River (Abutment B), Brgy. Luyang, Carmen","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"CARMEN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"POWER MOVE BUILDERS & CONSTRUCTION SUPPLY","c":4402803.81,"abc":4413910.0,"fy":"2023","sd":"03/30/2023","cd":"2023-06-12","lat":10.606318,"lon":124.024475,"sm":338,"fm":338,"tm":338,"am":338,"md":0.0,"ls":"inside","ww":"Luyang","wn":"Luyang River","wd":0.01,"wp":[10.60627,124.02444],"wst":"matched","br":"Luyang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5656},{"i":7302,"cid":"22F00065","pid":"P00620275LZ","t":"Construction of Barit River Flood Mitigation Structure (San Jose Section), Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":97244668.14,"abc":97244668.14,"fy":"2022","sd":"03/21/2022","cd":"2022-11-30","lat":13.404505,"lon":123.390529,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.02,"wp":[13.40449,123.39068],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5657},{"i":7303,"cid":"22FI0038","pid":"P00620741LZ","t":"Rehabilitation/Improvement of Bon-bon River Control, Milagros, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":33004435.48,"abc":33004435.48,"fy":"2022","sd":"02/08/2022","cd":"2022-08-18","lat":12.231298,"lon":123.500798,"sm":974,"fm":974,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":"Bon-bon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5658},{"i":7304,"cid":"23FB0101","pid":"P00727380LZ","t":"Construction of Flood Control Dike at Makabalo River, Brgy 15, Ilawod East, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JEJAN CONSTRUCTION AND SUPPLY(FOR. JEJAN CONSTRUCT","c":24497975.66,"abc":24498540.76,"fy":"2023","sd":"04/05/2023","cd":"2023-07-28","lat":13.135241,"lon":123.745084,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Makabalo","wn":"Makabalo River","wd":0.22,"wp":[13.13399,123.74356],"wst":"matched","br":"15","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5659},{"i":7305,"cid":"23FB0028","pid":"P00737382LZ","t":"Construction of Road Dike Structure along Tagaytay-Libod River (Phase-2), Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION)","c":57898389.08,"abc":57898534.32,"fy":"2023","sd":"02/27/2023","cd":"2023-08-31","lat":13.170314,"lon":123.634452,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Tagaytay-Libod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5660},{"i":7306,"cid":"24HN0130","pid":"P00821057VS","t":"Construction of Flood Control Structure along Jagobiao Creek, Poblacion Oriental, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GONZALODO ENTERPRISES","c":48970000.0,"abc":49000000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-08-22","lat":10.370145,"lon":123.95333,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Jagobiao","wn":"Jagobiao Creek","wd":0.0,"wp":[10.37011,123.95333],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5661},{"i":7307,"cid":"23HF0018","pid":"P00721823VS","t":"Rehabilitation of Flood Mitigation Structure at Caridad River along Toledo-Tabuelan-Sn Remigio Rd, Barangay Jagbuaya, Tuburan, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":19540533.8,"abc":19600000.0,"fy":"2023","sd":"02/02/2023","cd":"2023-09-06","lat":10.692719,"lon":123.810972,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Caridad","wn":"Caridad River","wd":0.01,"wp":[10.69274,123.81093],"wst":"matched","br":"Jagbuaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5662},{"i":7308,"cid":"23HI0061","pid":"P00721770VS","t":"Construction of Flood Control Structure along Guinsay River, Danao, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DANAO CITY (CEBU)","deo":"Cebu 5th District Engineering Office","co":"POWER MOVE BUILDERS & CONSTRUCTION SUPPLY / VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":77077770.77,"abc":77200000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-12-24","lat":10.540826,"lon":124.024651,"sm":479,"fm":479,"tm":479,"am":479,"md":0.0,"ls":"inside","ww":"Guinsay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5663},{"i":7309,"cid":"23FB0194","pid":"P00726982LZ","t":"Construction of Flood Control System along Purok 3, Bamban-Balasbas, Manito, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"MANITO (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP. / ALPHARD PRIMECON CONSTRUCTION","c":72316233.42,"abc":72316488.3,"fy":"2023","sd":"08/15/2023","cd":"2024-01-19","lat":13.113751,"lon":123.883345,"sm":919,"fm":919,"tm":919,"am":919,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5664},{"i":7310,"cid":"23GQ0046","pid":"P00733699VS","t":"Construction of Flood Control Structure (Sheet Pile) at Higalaman River (Downstream Higalaman Bridge), San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":49500000.0,"abc":49500000.0,"fy":"2023","sd":"04/27/2023","cd":"2024-01-12","lat":10.4649,"lon":123.39094,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Higalaman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5665},{"i":7311,"cid":"22F00163","pid":"P00640482LZ","t":"Rehabilitation of Shore Protection Structure, Sitio Busdak, Brgy. Bartolabac, San Jacinto, Masbate","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region V","pv":"MASBATE","mu":"SAN JACINTO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98999354.98,"abc":98999354.98,"fy":"2022","sd":"07/28/2022","cd":"2023-12-20","lat":12.54387,"lon":123.634619,"sm":1295,"fm":1295,"tm":1295,"am":1295,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bartolabac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5666},{"i":7312,"cid":"23FG0040","pid":"P00736102LZ","t":"Construction of Flood Mitigation Structure along Rangas River, Catagbacan (Phase 2), Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":95536200.0,"abc":95536200.0,"fy":"2023","sd":"02/26/2023","cd":"2024-08-27","lat":13.676241,"lon":123.502791,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.51,"wp":[13.68086,123.50327],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5667},{"i":7313,"cid":"22KJ0010","pid":"P00630586MN","t":"Construction of Slope Protection Downstream of Malubog Bridge I along Labuyo-Tangub-Silaya Road, Tangub City, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"GRACE CONSTRUCTION CORPORATION","c":13963714.93,"abc":14700000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-03-20","lat":8.053636,"lon":123.745096,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5668},{"i":7314,"cid":"22HN0076","pid":"P00633227VS","t":"Construction of Flood Control Structure along Cansag River, Brgy Danglag (Phase IV), Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"A.S.T BUILDERS","c":49500000.0,"abc":49500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-12-12","lat":10.397355,"lon":123.953702,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5669},{"i":7315,"cid":"22FK0009","pid":"P00620300LZ","t":"Construction of Suji River Control Phase II, Casiguran, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASIGURAN (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR","c":77199727.69,"abc":77199986.42,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":12.884605,"lon":124.025005,"sm":347,"fm":347,"tm":347,"am":347,"md":0.0,"ls":"inside","ww":"Suji","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5670},{"i":7316,"cid":"22FB0135","pid":"P00639539LZ","t":"Construction of River Bank Protection Works along Libod, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"INFRA BUILDERS AND SELLERS, PHILIPPINES","c":48998161.24,"abc":48998392.17,"fy":"2022","sd":"04/11/2022","cd":"2022-10-07","lat":13.179212,"lon":123.636007,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5671},{"i":7317,"cid":"22HA0106","pid":"P00633209VS","t":"Construction of Slope Protection Structure at Ulbujan-Camias-Cangguha-Sampoangon Road, Calape, Bohol","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"BOHOL","mu":"CALAPE (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"CEBU 7H TECHNOCHEM INDUSTRIES, INC. / REBTRADE INTERNATIONAL CORPORATION","c":99000000.0,"abc":99000000.0,"fy":"2022","sd":"07/15/2022","cd":"2023-02-18","lat":9.864113,"lon":123.883927,"sm":296,"fm":296,"tm":296,"am":296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5672},{"i":7318,"cid":"22HO0080","pid":"P00620451VS","t":"Construction of of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167.00, Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION","c":29399951.87,"abc":29399951.87,"fy":"2022","sd":"03/23/2022","cd":"2022-11-10","lat":9.933121,"lon":123.391415,"sm":980,"fm":980,"tm":980,"am":980,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5673},{"i":7319,"cid":"24FO0061","pid":"P00823647LZ","t":"Construction of Cabilogan River Flood Control Structure, Barangay Bongoran, Oas, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-08-21","lat":13.254532,"lon":123.503089,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":"Cabilogan","wn":"Cabilogan River","wd":0.01,"wp":[13.25465,123.50312],"wst":"matched","br":"Bongoran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5674},{"i":7320,"cid":"23KG0022","pid":"P00721251MN","t":"Construction of Flood Mitigation Structure along Maigo Bridge (B00949MN), Downstream (L/S), Maigo, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"DICON BUILDERS CORP.","c":57900000.0,"abc":57900000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-01-26","lat":8.155993,"lon":123.953885,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5675},{"i":7321,"cid":"22FB0033","pid":"P00620682LZ","t":"Construction of Taysan-Makabalo Creek Along Dreamland Subdivision, Taysan, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"BIEN RAICE CONSTRUCTION AND SUPPLY CORPORATION","c":29398439.56,"abc":29398439.56,"fy":"2022","sd":"03/02/2022","cd":"2022-07-07","lat":13.118688,"lon":123.745579,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Taysan-Makabalo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5676},{"i":7322,"cid":"22HF0050","pid":"P00620123VS","t":"Construction of Flood Mitigation Structure at Langoyon River, Section 1: Sta. 0+362 - Sta. 0+602, Section 2: Sta. 2+320 - Sta. 2+520, Brgy. Mangga, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48945957.56,"abc":49000000.0,"fy":"2022","sd":"08/02/2022","cd":"2023-06-23","lat":10.714383,"lon":123.812128,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangga","len":440.0,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5677},{"i":7323,"cid":"23HI0002","pid":"P00721830VS","t":"Construction of Flood Control Structure along Panalipan River, Catmon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CATMON (CEBU)","deo":"Cebu 5th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48994888.0,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-08-27","lat":10.648474,"lon":124.02512,"sm":356,"fm":356,"tm":356,"am":356,"md":0.0,"ls":"inside","ww":"Panalipan","wn":"Panalipan River","wd":0.0,"wp":[10.64847,124.02512],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5678},{"i":7324,"cid":"24HE0050","pid":"P00820190VS","t":"Improvement of Canasujan SRIS Drainage Canal, Carcar, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF CARCAR (CEBU)","deo":"Cebu 1st District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D","c":23913150.01,"abc":24137400.0,"fy":"2024","sd":"02/15/2024","cd":"2024-10-31","lat":10.090255,"lon":123.636125,"sm":379,"fm":379,"tm":379,"am":379,"md":0.0,"ls":"inside","ww":"Canasujan SRIS Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5679},{"i":7325,"cid":"22FA0075","pid":"P00637811LZ","t":"Continuation of Flood Mitigation along Naga River, Tiwi, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"TIWI (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":19800000.0,"abc":66329638.23,"fy":"2022","sd":"06/23/2022","cd":"2022-11-11","lat":13.282243,"lon":123.392198,"sm":1574,"fm":1574,"tm":1574,"am":782,"md":24.1,"ls":"outside","ww":"Naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":24.1,"text":"The pin is 24.1 km outside Tiwi, Albay, the nearest municipality the record claims. It falls in Libon, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":236},{"i":7326,"cid":"22F00110","pid":"P00620725LZ","t":"Construction of Flood Control Structure along Culasi River (Package II), Brgy. Taytay, Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":48234246.84,"abc":48234246.84,"fy":"2022","sd":"03/22/2022","cd":"2023-02-26","lat":13.710721,"lon":123.503523,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Culasi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Taytay","len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5680},{"i":7327,"cid":"23HN0101","pid":"P00722000VS","t":"Construction of Flood Control Structure along Cansaga River,Barangay Garing, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GTM BUILDERS & SUPPLY / ECBJ EASTCOAST CONSTRUCTION","c":48989000.0,"abc":49000000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-09-25","lat":10.400909,"lon":123.953998,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Garing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5681},{"i":7328,"cid":"23FB0084","pid":"P00742473LZ","t":"Construction of Road Dike along Barangay Taysan to Makabalo River, Legazpi City","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":49410453.64,"abc":49410664.89,"fy":"2023","sd":"04/05/2023","cd":"2023-09-22","lat":13.122111,"lon":123.745694,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Makabalo","wn":"Makabalo River","wd":0.01,"wp":[13.12208,123.74575],"wst":"matched","br":"Taysan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5682},{"i":7329,"cid":"23HN0091","pid":"P00721832VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Garing, Consolacion, Cebu, Phase 6","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":48900000.0,"abc":49000000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-09-18","lat":10.401014,"lon":123.95408,"sm":453,"fm":453,"tm":362,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.28,"text":"The record contradicts itself: the municipality field and the pin point to Consolacion, Cebu, but the title names Cebu City, Cebu, 3 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":543},{"i":7330,"cid":"24KF0026","pid":"P00821090MN","t":"Construction of Revetment/Riverbank Protection at Ilian Bridge, along Bauyan Riverstream, Upstream (L/S)","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"SULTAN NAGA DIMAPORO (KAROMATAN) (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"MOYA CONSTRUCTION / AL HUSSEIN CONSTRUCTION","c":48840967.7,"abc":48995500.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-18","lat":7.741572,"lon":123.812883,"sm":1492,"fm":1492,"tm":null,"am":1492,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5683},{"i":7331,"cid":"22FK0048","pid":"P00632977LZ","t":"Construction of Drainage System, Barangay Del Rosario, Bacon District, Sorsogon City, Sorsogon","w":"Construction of Drainage Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":4947141.49,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":13.04608,"lon":124.02674,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Del Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5684},{"i":7332,"cid":"22FA0010","pid":"P00631330LZ","t":"Construction of Soa (Upstream) River Control, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":49000000.0,"abc":48999749.19,"fy":"2022","sd":"08/10/2022","cd":"2022-11-30","lat":13.203122,"lon":123.392644,"sm":897,"fm":897,"tm":897,"am":782,"md":26.29,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.97,"value":26.29,"text":"The pin is 26.3 km outside Malinao, Albay, the nearest municipality the record claims. It falls in Libon, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":161},{"i":7333,"cid":"23FL0022","pid":"P00742195LZ","t":"Construction of Slope Protection, Brgy. Calomagon, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96031002.69,"abc":99000000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-03-10","lat":12.707498,"lon":123.884146,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calomagon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5685},{"i":7334,"cid":"21H00044","pid":"P00549964VS","t":"Construction of Flood Mitigation Structures along Larena-Basac-Maria Road, Siquijor","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"SIQUIJOR","mu":"Siquijor","deo":"Siquijor District Engineering Office","co":"JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S)","c":96499997.28,"abc":96500000.0,"fy":"2021","sd":"01/13/2022","cd":"2023-01-24","lat":9.1253,"lon":123.6384,"sm":1465,"fm":null,"tm":1465,"am":765,"md":7.14,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.78,"value":7.14,"text":"The pin is 7.1 km outside Siquijor, Siquijor, the nearest municipality the record claims. It falls in Lazi, Siquijor.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":176},{"i":7335,"cid":"23JE0031","pid":"P00732480MN","t":"Construction of Drainage Canal, Barangay Sudlon, Molave, Zamboanga del Sur","w":"Construction of Drainage Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"MOLAVE (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":4939955.66,"abc":4950000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-09-05","lat":8.087,"lon":123.504,"sm":984,"fm":984,"tm":984,"am":984,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sudlon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5686},{"i":7336,"cid":"24FB0036","pid":"P00846108LZ","t":"Construction of Flood Control Structure (Dike) with Drainage System along Taysan, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION) / ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":98998134.14,"abc":98998957.41,"fy":"2024","sd":"03/20/2024","cd":"2024-10-22","lat":13.118839,"lon":123.746722,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5687},{"i":7337,"cid":"23HN0051","pid":"P00721680VS","t":"Construction of Flood Control/Drainage in barangays Basak and Babag (Phase 3), Lapu-Lapu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LAPU-LAPU CITY (OPON) (CEBU)","deo":"Cebu 6th District Engineering Office","co":"FLORIANE CONSTRUCTION CORPORATION (FORMERLY: FLORIANE CONSTRUCTION & SUPPLY)","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-09-07","lat":10.289081,"lon":123.954636,"sm":754,"fm":754,"tm":754,"am":754,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basak","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5688},{"i":7338,"cid":"24HF0044","pid":"P00820192VS","t":"Rehabilitation of Flood Mitigation Structure at Langoyon River, Tuburan, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY","c":19300000.0,"abc":19600000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-07-12","lat":10.714921,"lon":123.813474,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5689},{"i":7339,"cid":"22HB0100","pid":"P00620116VS","t":"Construction of Loboc River Control Structure (Package 4), Barangay Jimili-an, Loboc, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"LOBOC (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":48988729.71,"abc":49000000.0,"fy":"2022","sd":"04/12/2022","cd":"2023-12-09","lat":9.644071,"lon":124.027024,"sm":804,"fm":804,"tm":804,"am":804,"md":0.0,"ls":"inside","ww":"Loboc","wn":"Loboc River","wd":0.04,"wp":[9.64431,124.02724],"wst":"matched","br":"Jimili-an","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5690},{"i":7340,"cid":"23KF0072","pid":"P00721613MN","t":"Construction of Revetment at Ilian Bridge, along Bauyan Riverstream, Barangay Ilian, Sultan Naga Dimaporo, Lanao del Norte Sta.0+000 - Sta.0+200","w":"Construction of Revetment","rg":"Region X","pv":"LANAO DEL NORTE","mu":"SULTAN NAGA DIMAPORO (KAROMATAN) (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"NDP CONSTRUCTION DEVELOPMENT / AL HUSSEIN CONSTRUCTION","c":48973571.68,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2024-05-02","lat":7.74132,"lon":123.813547,"sm":1492,"fm":1492,"tm":1492,"am":1492,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ilian","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5691},{"i":7341,"cid":"22FN0039","pid":"P00631004LZ","t":"Rehabilitation of Waras Flood Control (Upstream of Waras Bridge, Left Side), Barangay San Juan to Bagumbayan Section, Baao, Camarines Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISAM CONSTRUCTION & SUPPLIES","c":77199975.67,"abc":77200000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-09-19","lat":13.452598,"lon":123.393111,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5692},{"i":7342,"cid":"22FI0036","pid":"P00620747LZ","t":"Rehabilitation/Improvement of Tugbo River Control, Masbate City and Mobo, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"CITY OF MASBATE (CAPITAL) (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"ARKY CONSTRUCTION AND SUPPLY","c":33004386.92,"abc":33004386.92,"fy":"2022","sd":"02/08/2022","cd":"2022-10-05","lat":12.349555,"lon":123.639172,"sm":404,"fm":404,"tm":404,"am":404,"md":0.0,"ls":"inside","ww":"Tugbo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5693},{"i":7343,"cid":"22FO0032","pid":"P00630993LZ","t":"Rehabilitation of Bonbon and Bulusan Flood Control Structure (Downstream of Morocmoc Bridge, Right Side), Bonbon, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-09-10","lat":13.277686,"lon":123.393458,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5694},{"i":7344,"cid":"23FB0149","pid":"P00740440LZ","t":"Construction of Road Dike Structure along Barangay Sua to Barangay Libod (Package 2), Barangay Sua, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":72316174.75,"abc":72316434.18,"fy":"2023","sd":"06/19/2023","cd":"2023-10-07","lat":13.190033,"lon":123.639178,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sua","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5695},{"i":7345,"cid":"21FG0053","pid":"P00526232LZ","t":"Construction of Flood Mitigation Structure along Kulasi River, San Roque, Lagonoy, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"Lagonoy","deo":"Camarines Sur 4th District Engineering Office","co":"E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/09/2021","cd":"2022-11-04","lat":13.734517,"lon":123.504553,"sm":736,"fm":null,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":"Kulasi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5696},{"i":7346,"cid":"23HA0075","pid":"P00721936VS","t":"Construction of Drainage System/Outfall for New Gallares Hospital and other facilities, Cortes, Bohol","w":"Construction of Drainage Structure","rg":"Region VII","pv":"BOHOL","mu":"CORTES (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":48656422.0,"abc":49000000.0,"fy":"2023","sd":"07/05/2023","cd":"2024-04-14","lat":9.72483,"lon":123.88549,"sm":459,"fm":459,"tm":459,"am":459,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5697},{"i":7347,"cid":"23KG0024","pid":"P00721253MN","t":"Construction of Flood Mitigation Structure along Maigo Bridge (B00949MN), Upstream (L/S), Maigo, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-20","lat":8.155573,"lon":123.954751,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5698},{"i":7348,"cid":"22HB0096","pid":"P00620115VS","t":"Construction of Loboc River Control Structure (Package 3), Barangay Jimili-an, Loboc, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"LOBOC (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":48998764.5,"abc":49000000.0,"fy":"2022","sd":"04/26/2022","cd":"2023-12-11","lat":9.643823,"lon":124.027352,"sm":804,"fm":804,"tm":804,"am":804,"md":0.0,"ls":"inside","ww":"Loboc","wn":"Loboc River","wd":0.02,"wp":[9.64394,124.02753],"wst":"matched","br":"Jimili-an","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5699},{"i":7349,"cid":"24KF0024","pid":"P00820154MN","t":"Construction of Bulungan CIS Protection Dike, Sapad, Lanao Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"SAPAD (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":11976633.24,"abc":12233289.01,"fy":"2024","sd":"02/16/2024","cd":"2024-10-29","lat":7.850141,"lon":123.814528,"sm":1423,"fm":1423,"tm":1423,"am":1423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5700},{"i":7350,"cid":"22FA0075","pid":"P00640570LZ","t":"Extension of Estancia Flood Mitigation and River Control, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":14850000.0,"abc":66329638.23,"fy":"2022","sd":"06/23/2022","cd":"2022-11-11","lat":13.213288,"lon":123.395483,"sm":897,"fm":897,"tm":897,"am":782,"md":25.34,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.97,"value":25.34,"text":"The pin is 25.3 km outside Malinao, Albay, the nearest municipality the record claims. It falls in Libon, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":252},{"i":7351,"cid":"23HF0040","pid":"P00721764VS","t":"Construction of Flood Mitigation Structure at Guinabasan River, Barangay Sta. Lucia - Barangay Tubigan, Asturias, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ASTURIAS (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":77134000.0,"abc":77200000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-11-28","lat":10.553336,"lon":123.746953,"sm":79,"fm":79,"tm":79,"am":79,"md":0.0,"ls":"inside","ww":"Guinabasan","wn":"Ginabasan River","wd":7.05,"wp":[10.60885,123.7786],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":7.05,"text":"The title names Guinabasan, which OpenStreetMap maps through the stated municipality, but the pin is 7.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":281},{"i":7352,"cid":"23FN0044","pid":"P00726975LZ","t":"Construction of Riverbank Protection/Esplanade along Barit River, Brgy. Sagrada Familia Section Phase 2, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":139859923.4,"abc":139859984.0,"fy":"2023","sd":"03/22/2023","cd":"2024-03-27","lat":13.42985,"lon":123.505879,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.02,"wp":[13.43001,123.50572],"wst":"matched","br":"Sagrada Familia Section Phase 2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5701},{"i":7353,"cid":"22F00136","pid":"P00620324LZ","t":"Construction/Rehabilitation of San Rafael Storm Surge Protection, Donsol, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":131553950.0,"abc":279839557.3,"fy":"2022","sd":"07/14/2022","cd":"2023-12-20","lat":12.96633,"lon":123.506768,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5702},{"i":7354,"cid":"22HH0118","pid":"P00633015VS","t":"Construction of Drainage System at Barangay Sto. Niño, Cebu City","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"INCEP CONSTRUCTION AND DEVELOPMENT CORP.","c":4792519.98,"abc":4900000.0,"fy":"2022","sd":"09/13/2022","cd":"2023-03-02","lat":10.359004,"lon":123.885793,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5703},{"i":7355,"cid":"23FB0168","pid":"P00742196LZ","t":"Construction of Flood Mitigation Structure, Brgy. Sua, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98885867.64,"abc":98886253.44,"fy":"2023","sd":"06/30/2023","cd":"2023-12-20","lat":13.19355,"lon":123.639897,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5704},{"i":7356,"cid":"24HN0024","pid":"P00820325VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Garing, Phase 3, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-08-09","lat":10.406844,"lon":123.954939,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Garing","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5705},{"i":7357,"cid":"24KF0025","pid":"P00821089MN","t":"Construction of Revetment/Riverbank Protection at Ilian Bridge, along Bauyan Riverstream, Upstream (R/S)","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"SULTAN NAGA DIMAPORO (KAROMATAN) (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"U.M.D. CONSTRUCTION / LANAO BUILDER AND ENTERPRISES","c":48869498.05,"abc":48995500.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-24","lat":7.742203,"lon":123.815169,"sm":1492,"fm":1492,"tm":null,"am":1492,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5706},{"i":7358,"cid":"21F00005","pid":"P00525680LZ","t":"Construction/Improvement/Rehabilitation of Padang River Flood Mitigation Structure (Brgy. Buyuan and Brgy. Padang), Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":144749999.8,"abc":289499999.7,"fy":"2021","sd":"03/19/2021","cd":"2022-09-21","lat":13.206944,"lon":123.747615,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Padang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buyuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5707},{"i":7359,"cid":"22HB0095","pid":"P00630220VS","t":"Construction of Loboc River Control, Barangay Jimili-an Package 2, Loboc, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"LOBOC (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-12-15","lat":9.639167,"lon":124.028333,"sm":804,"fm":804,"tm":804,"am":804,"md":0.0,"ls":"inside","ww":"Loboc","wn":"Loboc River","wd":0.05,"wp":[9.63931,124.02879],"wst":"matched","br":"Jimili-an Package 2","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5708},{"i":7360,"cid":"24HE0166","pid":"P00834981VS","t":"Construction of Revetment Wall Structure along Mananga River (Left Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":148500000.0,"abc":148500000.0,"fy":"2024","sd":"03/08/2024","cd":"2025-02-21","lat":10.311699,"lon":123.816411,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.01,"wp":[10.31178,123.8163],"wst":"matched","br":"Camp 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5709},{"i":7361,"cid":"22FN0057","pid":"P00630989LZ","t":"Construction of River Slope Protection along Waras River, Bagumbayan Section, Baao, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BAAO (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":65187109.3,"abc":67550000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-09","lat":13.455215,"lon":123.395587,"sm":86,"fm":86,"tm":86,"am":86,"md":0.0,"ls":"inside","ww":"Waras","wn":"Waras","wd":0.04,"wp":[13.45503,123.39585],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5710},{"i":7362,"cid":"23FI0030","pid":"P00725889LZ","t":"Construction of Milagros Seawall, Sta. 0+217.00 - Sta. 0+340.50, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":91675000.0,"abc":91674973.36,"fy":"2023","sd":"08/09/2023","cd":"2024-06-10","lat":12.216336,"lon":123.507025,"sm":974,"fm":974,"tm":974,"am":974,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":123.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5711},{"i":7363,"cid":"23HN0056","pid":"P00721681VS","t":"Construction of Flood Control Structure along Basak Creek, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48984888.0,"abc":49000000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-01-07","lat":10.357616,"lon":123.955512,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Basak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5712},{"i":7364,"cid":"23FB0143","pid":"P00740441LZ","t":"Construction of Road Dike Structure along Barangay Sua to Barangay Libod (Package 3), Barangay Libod, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":72267813.25,"abc":72268122.02,"fy":"2023","sd":"05/17/2023","cd":"2023-11-22","lat":13.185997,"lon":123.640078,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sua","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5713},{"i":7365,"cid":"23HH0107","pid":"P00721836VS","t":"Construction of Flood Mitigation Structure along Guadalupe River, Barangay Sambag 2, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"CHARLZ CONSTRUCTION, INC.","c":43595644.8,"abc":44100000.0,"fy":"2023","sd":"07/20/2023","cd":"2024-02-20","lat":10.301452,"lon":123.886947,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Guadalupe","wn":"Guadalupe River","wd":0.0,"wp":[10.30145,123.88695],"wst":"matched","br":"Sambag 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5714},{"i":7366,"cid":"23FB0142","pid":"P00740675LZ","t":"Construction of River Bank Protection Works and Drainage System along Purok 3 Sitio Laom, Brgy. Padang (Upstream) Phase 2, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":48942124.8,"abc":48942370.68,"fy":"2023","sd":"05/17/2023","cd":"2023-09-30","lat":13.212157,"lon":123.748753,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5715},{"i":7367,"cid":"22HB0092","pid":"P00630219VS","t":"Construction of Flood Control Structure, Loboc River, Villaflor, Loboc , Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"LOBOC (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":40179948.69,"abc":40180000.0,"fy":"2022","sd":"05/04/2022","cd":"2023-02-15","lat":9.6348,"lon":124.030665,"sm":804,"fm":804,"tm":804,"am":804,"md":0.0,"ls":"inside","ww":"Loboc","wn":"Loboc River","wd":0.03,"wp":[9.63497,124.03091],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5716},{"i":7368,"cid":"24HE0167","pid":"P00834982VS","t":"Construction of Revetment Wall Structure along Mananga River (Right Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":148500000.0,"abc":148500000.0,"fy":"2024","sd":"03/08/2024","cd":"2025-02-21","lat":10.311699,"lon":123.816432,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.02,"wp":[10.31179,123.81631],"wst":"matched","br":"Camp 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5717},{"i":7369,"cid":"23FN0019","pid":"P00727326LZ","t":"Construction of Flood Mitigation Structure along Barit River (Upstream), Left Side Phase II, Brgy. San Jose, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION / ASCON CONSTRUCTION AND SUPPLY","c":77096696.93,"abc":77097058.0,"fy":"2023","sd":"03/20/2023","cd":"2023-08-25","lat":13.40341,"lon":123.39627,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.38,"wp":[13.40663,123.39505],"wst":"matched","br":"San Jose","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5718},{"i":7370,"cid":"22FK0018","pid":"P00620289LZ","t":"Construction of Gimaloto River Control, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"AARCON BUILDERS","c":77165034.11,"abc":77199993.93,"fy":"2022","sd":"02/17/2022","cd":"2023-05-25","lat":12.963557,"lon":123.955988,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Gimaloto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5719},{"i":7371,"cid":"22FB0111","pid":"P00631344LZ","t":"Construction of Suha Flood Control Dike, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / 3RB CONSTRUCTION & SUPPLY","c":48998125.42,"abc":48998316.52,"fy":"2022","sd":"02/21/2022","cd":"2022-07-15","lat":13.196045,"lon":123.640374,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5720},{"i":7372,"cid":"22HH0104","pid":"P00633017VS","t":"Riprapping at Barangay Budla-an, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BELCONSTRUCT CORPORATION","c":4895000.0,"abc":4950000.0,"fy":"2022","sd":"05/30/2022","cd":"2022-09-30","lat":10.385533,"lon":123.889233,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Budla-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5721},{"i":7373,"cid":"23FJ0016","pid":"P00726303LZ","t":"Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+165.00, Uson,  Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"GACT ENTERPRISES","c":39140952.92,"abc":39181452.96,"fy":"2023","sd":"08/07/2023","cd":"2024-06-08","lat":12.244516,"lon":123.749579,"sm":1618,"fm":1618,"tm":1618,"am":1618,"md":0.0,"ls":"inside","ww":"Marcella","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marcella","len":165.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5722},{"i":7374,"cid":"24HD0109","pid":"P00835006VS","t":"Construction of Seawall at Tabogon Port, Tabogon Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TABOGON (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES","c":49500000.0,"abc":49500000.0,"fy":"2024","sd":"08/27/2024","cd":"2024-12-26","lat":10.94766,"lon":124.03082,"sm":1503,"fm":1503,"tm":null,"am":1503,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5723},{"i":7375,"cid":"22FK0057","pid":"P00640600LZ","t":"Construction of Seawall at Brgy. Behia, Magallanes, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MAGALLANES (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":19734064.7,"abc":59399996.63,"fy":"2022","sd":"04/04/2022","cd":"2022-11-11","lat":12.820508,"lon":123.818838,"sm":862,"fm":862,"tm":862,"am":862,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Behia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5724},{"i":7376,"cid":"23HN0106","pid":"P00733741VS","t":"Rehabilitation of Road and Drainage System along George Tampus Road, Brgy. Basak, Lapu-Lapu City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"LAPU-LAPU CITY (OPON) (CEBU)","deo":"Cebu 6th District Engineering Office","co":"FLORIANE CONSTRUCTION CORPORATION (FORMERLY: FLORIANE CONSTRUCTION & SUPPLY)","c":17194575.0,"abc":29700000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-07-31","lat":10.29012,"lon":123.956139,"sm":754,"fm":754,"tm":754,"am":754,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5725},{"i":7377,"cid":"22HH0077","pid":"P00630656VS","t":"Construction of Drainage System at Barangay Sambag I, Cebu City, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"1ST J.E. ADLAWAN CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: ELEAZAR V. ADLAWAN CONSTRUCTION)","c":4939702.44,"abc":4950000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-07-19","lat":10.299678,"lon":123.889364,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sambag I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5726},{"i":7378,"cid":"24HO0099","pid":"P00834658VS","t":"Construction of Revetment along Basak River (Upstream), Badian, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48996484.84,"abc":48996720.0,"fy":"2024","sd":"03/18/2024","cd":"2024-10-22","lat":9.871516,"lon":123.39763,"sm":101,"fm":101,"tm":101,"am":101,"md":0.0,"ls":"inside","ww":"Basak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5727},{"i":7379,"cid":"23HH0086","pid":"P00721835VS","t":"Construction of Flood Mitigation Structure along Guadalupe River, Barangay Sambag 1, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"GOWIL BUILDERS","c":44019255.0,"abc":44100000.0,"fy":"2023","sd":"06/14/2023","cd":"2024-01-15","lat":10.297452,"lon":123.889479,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Guadalupe","wn":"Guadalupe River","wd":0.0,"wp":[10.29746,123.8895],"wst":"matched","br":"Sambag 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5728},{"i":7380,"cid":"24FB0080","pid":"P00823628LZ","t":"Construction of Flood Protection (Dike) along Brgy. Baligang (Phase 2), Camalig Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":48248950.81,"abc":48248953.35,"fy":"2024","sd":"04/12/2024","cd":"2024-11-15","lat":13.141382,"lon":123.640699,"sm":313,"fm":313,"tm":null,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baligang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5729},{"i":7381,"cid":"24FM0034","pid":"P00821010LZ","t":"Construction of Flood Mitigation Structure, Bito River (Upstream), Barangay Corbada, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":48999764.72,"abc":49000000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-12-02","lat":12.489722,"lon":123.750556,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Corbada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5730},{"i":7382,"cid":"22HA0057","pid":"P00620111VS","t":"Construction of Flood Mitigation Structure and Drainage System at Alegria, Sta. 000+000.00 - Sta. 000+625.00, Catigbian, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CATIGBIAN (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":48999390.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-15","lat":9.86247,"lon":124.03228,"sm":355,"fm":355,"tm":355,"am":355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":625.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5731},{"i":7383,"cid":"24FN0007","pid":"P00820437LZ","t":"Construction of Flood Control Structure along Barit River, Salvacion Section, Barangay Salvacion, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-12-12","lat":13.433302,"lon":123.508245,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.43329,123.50835],"wst":"matched","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5732},{"i":7384,"cid":"23HO0133","pid":"P00721876VS","t":"Construction of Dike at Valencia River (Downstream Right Side), Alegria, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":96112225.44,"abc":96112254.0,"fy":"2023","sd":"03/16/2023","cd":"2023-11-21","lat":9.750361,"lon":123.397811,"sm":29,"fm":29,"tm":29,"am":29,"md":0.0,"ls":"inside","ww":"Valencia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5733},{"i":7385,"cid":"23FB0074","pid":"P00740668LZ","t":"Construction of Flood Protection (Dike) along Brgy. Baligang, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":48186131.52,"abc":48188808.48,"fy":"2023","sd":"04/05/2023","cd":"2023-07-15","lat":13.143313,"lon":123.640821,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baligang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5734},{"i":7386,"cid":"22FO0057","pid":"P00631368LZ","t":"Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":49000000.0,"abc":93100000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-16","lat":13.29338,"lon":123.39825,"sm":782,"fm":782,"tm":null,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5735},{"i":7387,"cid":"22FK0019","pid":"P00620293LZ","t":"Construction of Pamurayan River Control, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":77026450.47,"abc":77199994.18,"fy":"2022","sd":"02/17/2022","cd":"2023-05-25","lat":12.964013,"lon":123.95661,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Pamurayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5736},{"i":7388,"cid":"24HE0163","pid":"P00834979VS","t":"Construction of flood control structure along Mananga River (Right side), Sitio Kimawa, Barangay Jaclupan, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":89100000.0,"abc":89100000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-12-19","lat":10.283318,"lon":123.819706,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.02,"wp":[10.28322,123.81959],"wst":"matched","br":"Jaclupan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5737},{"i":7389,"cid":"21HE0156","pid":"P00549966VS","t":"Construction of Tina-An River Flood Control Structure, Naga City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"City of Naga","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"11/03/2021","cd":"2022-08-01","lat":10.206233,"lon":123.750883,"sm":408,"fm":null,"tm":408,"am":408,"md":0.0,"ls":"inside","ww":"Tina-An","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5738},{"i":7390,"cid":"23FI0022","pid":"P00725892LZ","t":"Construction of Poblacion West Seawall, Sta. 0+114.00 - Sta. 0+217.00, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":62725000.0,"abc":62724955.75,"fy":"2023","sd":"08/09/2023","cd":"2024-04-15","lat":12.216113,"lon":123.508384,"sm":974,"fm":974,"tm":974,"am":974,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":103.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5739},{"i":7391,"cid":"23FK0089","pid":"P00742490LZ","t":"Construction of River Control Structures (Groundsill) at Balete, Bacon District, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":4943439.65,"abc":54449963.17,"fy":"2023","sd":"07/18/2023","cd":"2024-03-05","lat":13.036746,"lon":124.035647,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5740},{"i":7392,"cid":"22FB0250","pid":"P00639535LZ","t":"Construction of Flood Control Structure, Purok 6 Quirangay-Bariw (Phase 2), Sta. 0 + 500 - Sta. 0 + 720, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48999470.75,"abc":48998457.14,"fy":"2022","sd":"06/20/2022","cd":"2022-12-13","lat":13.195504,"lon":123.641854,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":220.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5741},{"i":7393,"cid":"22HE0032","pid":"P00620020VS","t":"Construction of Carcar River Flood Control Structure, Poblacion I, Sta. 0+000.00 - Sta. 0+504.00, Carcar City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF CARCAR (CEBU)","deo":"Cebu 1st District Engineering Office","co":"PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION)","c":91674735.35,"abc":91675000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-01-16","lat":10.102859,"lon":123.644875,"sm":379,"fm":379,"tm":379,"am":379,"md":0.0,"ls":"inside","ww":"Carcar","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":504.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5742},{"i":7394,"cid":"23HH0124","pid":"P00733747VS","t":"Construction of Flood Mitigation Structure, Brgy. Sambag 1 , Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"MATROSON BUILDERS & ENGINEERING SERVICES","c":4944995.26,"abc":4950000.0,"fy":"2023","sd":"10/10/2023","cd":"2024-02-10","lat":10.302227,"lon":123.890017,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sambag 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5743},{"i":7395,"cid":"24HD0106","pid":"P00834644VS","t":"Construction of Flood Control and Drainage System at Barangay, Gawaygaway, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN REMIGIO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"ADAMANT DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"07/08/2024","cd":"2024-12-19","lat":10.96971,"lon":123.95662,"sm":1355,"fm":1355,"tm":1355,"am":373,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5744},{"i":7396,"cid":"24HE0164","pid":"P00834983VS","t":"Construction of Revetment Wall Structure along Mananga River (Right Side), Purok Narra, Barangay Jaclupan, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":138600000.0,"abc":138600000.0,"fy":"2024","sd":"03/04/2024","cd":"2025-01-20","lat":10.282452,"lon":123.821872,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.01,"wp":[10.28239,123.82188],"wst":"matched","br":"Jaclupan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5745},{"i":7397,"cid":"22FO0100","pid":"P00631358LZ","t":"Construction of Kalakran River Flood Control Structure, Barangay Pistola, Oas, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":48999187.66,"abc":98000000.0,"fy":"2022","sd":"08/01/2022","cd":"2023-03-31","lat":13.25037,"lon":123.50872,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":"Kalakran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pistola","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5746},{"i":7398,"cid":"22FB0109","pid":"P00620302LZ","t":"Construction of Yawa River Control System (Legazpi City Urban Drainage), Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION / 3RB CONSTRUCTION & SUPPLY","c":67548213.38,"abc":67548263.6,"fy":"2022","sd":"03/04/2022","cd":"2022-10-09","lat":13.161771,"lon":123.751132,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Yawa","wn":"Yawa River","wd":0.01,"wp":[13.16168,123.7511],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5747},{"i":7399,"cid":"24HD0004","pid":"P00820187VS","t":"Construction of Flood Control Structure at Magsa-ubay Bridge, Daanbantayan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DAANBANTAYAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"TCP BUILDERS","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-11","lat":10.89945,"lon":124.03715,"sm":470,"fm":470,"tm":470,"am":1503,"md":25.58,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.97,"value":25.58,"text":"The pin is 25.6 km outside Daanbantayan, Cebu, the nearest municipality the record claims. It falls in Tabogon, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":219},{"i":7400,"cid":"23FM0007","pid":"P00726295LZ","t":"Construction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Corbada, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"EJ CANTORIA CONSTRUCTION & SUPPLY","c":23519985.34,"abc":23520000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-09-04","lat":12.49,"lon":123.7514,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Corbada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":544},{"i":7401,"cid":"23HH0108","pid":"P00721838VS","t":"Construction of Flood Mitigation Structure along Lahug River, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"ARQ BUILDERS / VNCO CONSTRUCTION","c":44030000.0,"abc":44100000.0,"fy":"2023","sd":"07/24/2023","cd":"2023-12-13","lat":10.335647,"lon":123.892427,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Lahug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5748},{"i":7402,"cid":"22FB0064","pid":"P00620681LZ","t":"Construction of Lahar Mitigation Structures, Brgy. Suha, Brgy. Tumpa, (Quirangay Section) Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":44098134.64,"abc":44098373.46,"fy":"2022","sd":"02/21/2022","cd":"2022-07-25","lat":13.206748,"lon":123.645288,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Suha","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5749},{"i":7403,"cid":"23FF0020","pid":"P00726618LZ","t":"Construction of Flood Mitigation Measure along Hibago River, Left Side, Upstream of Hibago Bridge, Brgy. Hibago, Ocampo, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"OCAMPO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PHILWORKS CONSTRUCTION & SUPPLY","c":85981400.0,"abc":86849990.26,"fy":"2023","sd":"02/20/2023","cd":"2023-12-01","lat":13.565866,"lon":123.398756,"sm":1033,"fm":1033,"tm":1033,"am":1033,"md":0.0,"ls":"inside","ww":"Hibago","wn":"Hibago River","wd":0.01,"wp":[13.56582,123.39879],"wst":"matched","br":"Hibago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5750},{"i":7404,"cid":"23HE0141","pid":"P00721879VS","t":"Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Ibo, Barangay Lagtang, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-03-05","lat":10.275847,"lon":123.822113,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.28,"wp":[10.27554,123.82468],"wst":"matched","br":"Lagtang","len":null,"ph":null,"dup":[7413,7421,7429],"run":[7413,7421,7429],"cl":[7413,7421,7429,7463,7469,7478,7487,7495],"L":"field","s":75,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 386,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HE0141 to 23HE0144) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1},{"i":7405,"cid":"23FJ0025","pid":"P00726308LZ","t":"Construction of Nabangig Flood Control, Sta. 0+020.00 - Sta. 0+255.00, Upstream Right Side, Palanas, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"PALANAS (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"RED DIAMOND CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: RED DIAMOND CONSTRUCTION)","c":22491873.94,"abc":22494177.9,"fy":"2023","sd":"04/25/2023","cd":"2023-07-15","lat":12.099265,"lon":123.957059,"sm":1065,"fm":1065,"tm":1065,"am":1065,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":235.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5751},{"i":7406,"cid":"22FI0040","pid":"P00620291LZ","t":"Construction of Milagros Seawall and Boulevard, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":96500000.0,"abc":96499963.39,"fy":"2022","sd":"02/22/2022","cd":"2023-05-24","lat":12.215893,"lon":123.50872,"sm":974,"fm":974,"tm":974,"am":974,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5752},{"i":7407,"cid":"22FK0021","pid":"P00630971LZ","t":"Construction of Flood Mitigating Structure along Rawis River (Downstream) and Gatbo River, Bacon District, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96499953.46,"abc":96499962.61,"fy":"2022","sd":"02/18/2022","cd":"2022-12-21","lat":13.040678,"lon":124.037747,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Rawis","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5753},{"i":7408,"cid":"23HF0026","pid":"P00721822VS","t":"Rehabilitation of Flood Mitigation Structure at Guinabasan River, Barangay Sta. Lucia, Asturias, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"ASTURIAS (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":18546000.0,"abc":19600000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-26","lat":10.629431,"lon":123.751433,"sm":79,"fm":79,"tm":79,"am":79,"md":0.0,"ls":"inside","ww":"Guinabasan","wn":"Ginabasan River","wd":0.02,"wp":[10.6296,123.75158],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5754},{"i":7409,"cid":"22FK0004","pid":"P00620272LZ","t":"Construction of Bacon Boulevard Breakwater (Package 4), Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96493351.5,"abc":96499843.54,"fy":"2022","sd":"02/17/2022","cd":"2022-12-03","lat":13.042782,"lon":124.043873,"sm":422,"fm":422,"tm":422,"am":422,"md":0.17,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5755},{"i":7410,"cid":"24HF0007","pid":"P00820398VS","t":"Construction of Flood Mitigation Structure at Sapangdaku River, Barangay Daanglungsod - Barangay Dumlog, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-09-05","lat":10.39286,"lon":123.646449,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Daanglungsod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5756},{"i":7411,"cid":"22HH0122","pid":"P00630661VS","t":"Construction of Drainage System, Barangay  Camputhaw ,Cebu Cty","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"M.C. BUYSER CONSTRUCTION & SUPPLY","c":4939939.5,"abc":4950000.0,"fy":"2022","sd":"10/05/2022","cd":"2023-02-13","lat":10.321334,"lon":123.895317,"sm":362,"fm":362,"tm":null,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camputhaw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5757},{"i":7412,"cid":"22HN0038","pid":"P00630647VS","t":"Construction of Sewage Treatment Plant, Barangay Pajo, Lapu-lapu, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LAPU-LAPU CITY (OPON) (CEBU)","deo":"Cebu 6th District Engineering Office","co":"MEGA PLUS CONSTRUCTION AND SUPPLY CORP. (FORMERLY: MEGA PLUS CONSTRUCTION)","c":6930000.0,"abc":6930000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-27","lat":10.317513,"lon":123.95709,"sm":754,"fm":754,"tm":754,"am":754,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pajo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5758},{"i":7413,"cid":"23HE0142","pid":"P00721880VS","t":"Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-03-05","lat":10.275847,"lon":123.822113,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.28,"wp":[10.27554,123.82468],"wst":"matched","br":"Lagtang","len":null,"ph":null,"dup":[7404,7421,7429],"run":[7404,7421,7429],"cl":[7404,7421,7429,7463,7469,7478,7487,7495],"L":"field","s":75,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 386,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HE0141 to 23HE0144) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":2},{"i":7414,"cid":"22FO0057","pid":"P00631372LZ","t":"Rehabilitation of Marocmoc Bridge Flood Control Structure (Right Side Facing Upstream and Left Side Facing Downstream of Marocmoc Bridge) in Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":44100000.0,"abc":93100000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-16","lat":13.29366,"lon":123.39879,"sm":782,"fm":782,"tm":null,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5759},{"i":7415,"cid":"22HO0069","pid":"P00633233VS","t":"Construction of Waterway along Tubod River (Section 1), Dumanjug, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":45539979.25,"abc":45539979.25,"fy":"2022","sd":"03/23/2022","cd":"2022-10-19","lat":10.024547,"lon":123.509472,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":"Tubod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5760},{"i":7416,"cid":"21FB0050","pid":"P00561196LZ","t":"Construction of Flood Control Dike and Bank Protection Works along Arimbay-Matanag River, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"CBC CONSTRUCTION & SUPPLY","c":39197824.08,"abc":39198459.2,"fy":"2021","sd":"03/04/2022","cd":"2022-08-11","lat":13.188725,"lon":123.751925,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Arimbay-Matanag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5761},{"i":7417,"cid":"22FK0003","pid":"P00620271LZ","t":"Construction of Bacon Boulevard Breakwater (Package 3), Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96472990.61,"abc":96499965.44,"fy":"2022","sd":"02/17/2022","cd":"2022-12-03","lat":13.042392,"lon":124.045052,"sm":422,"fm":422,"tm":422,"am":422,"md":0.14,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5762},{"i":7418,"cid":"24FB0005","pid":"P00839666LZ","t":"Construction of Flood Control Structure, Barangay Padang, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"QJ CONSTRUCTION","c":19015682.52,"abc":19798908.64,"fy":"2024","sd":"04/23/2024","cd":"2024-08-05","lat":13.205036,"lon":123.752244,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5763},{"i":7419,"cid":"23FO0049","pid":"P00740501LZ","t":"Rehabilitation/Improvement of Flood Mitigation Structure, Calzada - Rizal, Oas, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"CPR CONSTRUCTION AND SUPPLY, INC. (FORMERLY: CPR CONSTRUCTION AND SUPPLY)","c":62655000.0,"abc":62655000.0,"fy":"2023","sd":"05/22/2023","cd":"2023-10-10","lat":13.25,"lon":123.51048,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":443},{"i":7420,"cid":"23HN0114","pid":"P00733263VS","t":"Construction of Flood Control Structure along Basak Creek, Mandaue City, Cebu, Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-04-04","lat":10.357057,"lon":123.957127,"sm":915,"fm":915,"tm":362,"am":915,"md":0.0,"ls":"inside","ww":"Basak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.48,"text":"The record contradicts itself: the municipality field and the pin point to Mandaue City, Cebu, but the title names Cebu City, Cebu, 3 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":463},{"i":7421,"cid":"23HE0143","pid":"P00721881VS","t":"Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Ibo, Barangay Lagtang, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-03-05","lat":10.275847,"lon":123.822113,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.28,"wp":[10.27554,123.82468],"wst":"matched","br":"Lagtang","len":null,"ph":null,"dup":[7404,7413,7429],"run":[7404,7413,7429],"cl":[7404,7413,7429,7463,7469,7478,7487,7495],"L":"field","s":75,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 386,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HE0141 to 23HE0144) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":3},{"i":7422,"cid":"23FO0053","pid":"P00742202LZ","t":"Construction of Flood Control Structure, Right Side Facing Upstream of Double Barrel Box Culvert at Sitio Camlambay, Brgy. Bulusan, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":74179689.03,"abc":146555000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-11-15","lat":13.293817,"lon":123.39883,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulusan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5764},{"i":7423,"cid":"23FK0006","pid":"P00726320LZ","t":"Construction/ Improvement of Flood Protection Measures along Mibacong River, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":29399984.46,"abc":71669931.81,"fy":"2023","sd":"02/23/2023","cd":"2023-11-22","lat":12.992597,"lon":123.897786,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Mibacong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5765},{"i":7424,"cid":"23FI0002","pid":"P00725891LZ","t":"Construction of Poblacion East Seawall, Sta. 0+250.00 - Sta. 0+322.00, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":57900000.0,"abc":57899968.79,"fy":"2023","sd":"08/09/2023","cd":"2024-04-06","lat":12.215742,"lon":123.511119,"sm":974,"fm":974,"tm":974,"am":974,"md":0.1,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":72.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5766},{"i":7425,"cid":"24HF0013","pid":"P00820358VS","t":"Construction of Weir Dam at Sapangdaku River (Phase II), Barangay Daanglungsod - Barangay Dumlog, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-10-25","lat":10.392524,"lon":123.649145,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Daanglungsod","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5767},{"i":7426,"cid":"23HD0019","pid":"P00721669VS","t":"Construction of Flood Control Structure at Magsa-ubay Bridge, Section 1 and 2, Sta. 000 + 000 - Sta. 000 + 306, Daanbantayan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DAANBANTAYAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"TCP BUILDERS","c":19600000.0,"abc":19600000.0,"fy":"2023","sd":"02/06/2023","cd":"2023-07-08","lat":11.273996,"lon":124.045519,"sm":470,"fm":470,"tm":470,"am":470,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":306.0,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5768},{"i":7427,"cid":"22FA0047","pid":"P00630994LZ","t":"Rehabilitation of Bulawan Flood Control San Jose Section, Malilipot, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.","c":52110000.0,"abc":95229997.38,"fy":"2022","sd":"08/05/2022","cd":"2023-04-01","lat":13.292813,"lon":123.752679,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5769},{"i":7428,"cid":"23F00039","pid":"P00740449LZ","t":"Construction of Flood Control Structure, Brgy. San Isidro, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"WELEX CONSTRUCTION, INCORPORATED (FORMERLY WELEX C","c":102434887.6,"abc":106149972.9,"fy":"2023","sd":"05/25/2023","cd":"2023-09-30","lat":12.659639,"lon":123.957409,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5770},{"i":7429,"cid":"23HE0144","pid":"P00721882VS","t":"Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-03-05","lat":10.275847,"lon":123.822113,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.28,"wp":[10.27554,123.82468],"wst":"matched","br":"Lagtang","len":null,"ph":null,"dup":[7404,7413,7421],"run":[7404,7413,7421],"cl":[7404,7413,7421,7463,7469,7478,7487,7495],"L":"field","s":75,"sig":[{"code":"shared_pin","group":"risk","strength":0.65,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 386,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HE0141 to 23HE0144) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":4},{"i":7430,"cid":"23FF0019","pid":"P00725907LZ","t":"Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Right Side, Upstream of Hibago Bridge, Brgy. Pinit, Ocampo, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"OCAMPO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"PHILWORKS CONSTRUCTION & SUPPLY","c":57194183.0,"abc":57771903.68,"fy":"2023","sd":"02/20/2023","cd":"2023-10-06","lat":13.565698,"lon":123.398854,"sm":1033,"fm":1033,"tm":1033,"am":1033,"md":0.0,"ls":"inside","ww":"Hibago","wn":"Hibago River","wd":0.01,"wp":[13.56581,123.39877],"wst":"matched","br":"Pinit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5771},{"i":7431,"cid":"22FA0021","pid":"P00632699LZ","t":"Construction of Inabuyan Seawall, Barangay Alimsog, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":59400000.0,"abc":57899996.25,"fy":"2022","sd":"03/11/2022","cd":"2022-10-11","lat":13.132903,"lon":123.511256,"sm":1411,"fm":1411,"tm":1411,"am":603,"md":22.93,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alimsog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":66,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.95,"value":22.93,"text":"The pin is 22.9 km outside Santo Domingo, Albay, the nearest municipality the record claims. It falls in Guinobatan, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":63},{"i":7432,"cid":"22HH0105","pid":"P00630654VS","t":"Rippraping , Barangay Agsungot , Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"TEN TWENTY ALLIED DEVELOPERS","c":4934888.0,"abc":4950000.0,"fy":"2022","sd":"05/30/2022","cd":"2022-09-19","lat":10.440428,"lon":123.898389,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Agsungot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5772},{"i":7433,"cid":"23HH0078","pid":"P00721786VS","t":"Construction of Flood Mitigation Structure along Mananga River, Barangay Bonbon, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"A.S.T BUILDERS / KYLE CONSTRUCTION SERVICES","c":86697376.14,"abc":86850000.0,"fy":"2023","sd":"04/19/2023","cd":"2024-01-24","lat":10.360546,"lon":123.8223,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.0,"wp":[10.36054,123.8223],"wst":"matched","br":"Bonbon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5773},{"i":7434,"cid":"23HO0096","pid":"P00721949VS","t":"Construction of Drainage System along Barangay Tunga, Moalboal, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":26458248.92,"abc":26458250.44,"fy":"2023","sd":"03/06/2023","cd":"2023-11-24","lat":9.951553,"lon":123.399975,"sm":980,"fm":980,"tm":980,"am":980,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5774},{"i":7435,"cid":"23FB0133","pid":"P00726979LZ","t":"Construction of Flood Control System along Purok 1, Ligban, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":72373363.93,"abc":72373954.3,"fy":"2023","sd":"05/17/2023","cd":"2023-11-23","lat":13.171774,"lon":123.649656,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5775},{"i":7436,"cid":"22FB0295","pid":"P00639387LZ","t":"Construction of Batan Seawall/Shore Protection, Sta. 0 + 000 - Sta. 0 + 450, Rapu-Rapu, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"RAPU-RAPU (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":86844393.96,"abc":86844853.25,"fy":"2022","sd":"07/12/2022","cd":"2023-03-02","lat":13.227653,"lon":124.048237,"sm":1201,"fm":1201,"tm":1201,"am":1201,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5776},{"i":7437,"cid":"24HF0009","pid":"P00820400VS","t":"Rehabilitation of Flood Mitigation Structure at Guinabasan River, Barangay Sta. Lucia, Asturias, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"ASTURIAS (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":19249374.01,"abc":19600000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-07-12","lat":10.628869,"lon":123.753518,"sm":79,"fm":79,"tm":79,"am":79,"md":0.0,"ls":"inside","ww":"Guinabasan","wn":"Ginabasan River","wd":0.04,"wp":[10.62925,123.7535],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5777},{"i":7438,"cid":"22HN0001","pid":"P00620025VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"BNR CONSTRUCTION & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-24","lat":10.394361,"lon":123.958721,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5778},{"i":7439,"cid":"24FN0028","pid":"P00821406LZ","t":"Construction of Riverbank Protection along Daraga River, Barangay San Isidro Section, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":135100000.0,"abc":135100000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-20","lat":13.396011,"lon":123.511461,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":"Daraga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5779},{"i":7440,"cid":"23KI0016","pid":"P00721378MN","t":"Construction of Flood Control Structure along Aloran River, Barangay Palayan, Aloran, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"ALORAN (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":48999979.13,"abc":49000000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-10-31","lat":8.419755,"lon":123.82259,"sm":47,"fm":47,"tm":47,"am":47,"md":0.0,"ls":"inside","ww":"Aloran","wn":"Aloran River","wd":0.01,"wp":[8.41967,123.82253],"wst":"matched","br":"Palayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5780},{"i":7441,"cid":"22HO0057","pid":"P00633005VS","t":"Construction of Revetment Wall along Polo River, Brgy. Polo, Sta. 0 + 000 - Sta. 0 + 143.00, Alcantara, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALCANTARA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":29399912.37,"abc":29399912.37,"fy":"2022","sd":"03/23/2022","cd":"2022-09-18","lat":9.964109,"lon":123.400746,"sm":26,"fm":26,"tm":26,"am":26,"md":0.0,"ls":"inside","ww":"Polo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Polo","len":143.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5781},{"i":7442,"cid":"24FB0017","pid":"P00821387LZ","t":"Construction of Flood Mitigation and Drainage Structure along Quirangay River, Camalig, Albay (Package 1)","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":96498182.44,"abc":96498958.63,"fy":"2024","sd":"02/26/2024","cd":"2024-11-18","lat":13.19037,"lon":123.650924,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Quirangay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5782},{"i":7443,"cid":"24MH0030","pid":"P00833601MN","t":"Construction of Flood Control Structure, Barangay Poblacion, Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":4941664.1,"abc":4950000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-07-08","lat":6.555,"lon":124.048888,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5783},{"i":7444,"cid":"22FB0150","pid":"P00639392LZ","t":"Construction of River Bank Protection Works (Upstream) of Barangay Padang, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"INFRA BUILDERS AND SELLERS, PHILIPPINES","c":96499920.56,"abc":97998410.04,"fy":"2022","sd":"04/13/2022","cd":"2023-01-11","lat":13.20403,"lon":123.75415,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5784},{"i":7445,"cid":"22HN0008","pid":"P00620024VS","t":"Construction of Flood Control Structure along Cansaga River with Box Culvert, Barangay Danglag, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-08","lat":10.389024,"lon":123.96014,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Danglag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5785},{"i":7446,"cid":"22FO0100","pid":"P00631361LZ","t":"Construction of Nagasgasan River Flood Control Structure, Barangay Obaliw Rinas, Oas, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":48999374.49,"abc":98000000.0,"fy":"2022","sd":"08/01/2022","cd":"2023-03-31","lat":13.24526,"lon":123.51289,"sm":1031,"fm":1031,"tm":1031,"am":396,"md":0.01,"ls":"boundary","ww":"Nagasgasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Obaliw Rinas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5786},{"i":7447,"cid":"22FB0015","pid":"P00631348LZ","t":"Rehabilitation of Quirangay River Wall, Camalig, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":24498153.5,"abc":24498430.13,"fy":"2022","sd":"02/21/2022","cd":"2022-07-14","lat":13.190366,"lon":123.651082,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Quirangay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5787},{"i":7448,"cid":"23HF0020","pid":"P00721826VS","t":"Construction of Flood Mitigation Structure at Langoyon River, Barangay Alegria - Barangay Cogon, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":43015488.45,"abc":43120000.0,"fy":"2023","sd":"02/02/2023","cd":"2023-08-29","lat":10.7064,"lon":123.8234,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":"Langoyon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Alegria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5788},{"i":7449,"cid":"22FN0040","pid":"P00630988LZ","t":"Construction of River Slope Protection along Barit River, Antipolo Old Section, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"RICHMAR CONSTRUCTION","c":67549910.38,"abc":67550000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-10-25","lat":13.410761,"lon":123.400786,"sm":1000,"fm":1000,"tm":1000,"am":648,"md":0.01,"ls":"boundary","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.4107,123.4008],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5789},{"i":7450,"cid":"22HH0070","pid":"P00630657VS","t":"Construction of Drainage System at Barangay San Antonio, Cebu City, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"PLANAC CONSTRUCTION","c":4742460.0,"abc":4950000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-07-18","lat":10.300907,"lon":123.899237,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5790},{"i":7451,"cid":"22FL0043","pid":"P00630972LZ","t":"Construction of Flood Mitigation Project in Barangay Tabon-tabon to Barangay Sto. Domingo, Cadac-an River, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":77193935.96,"abc":77200000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-31","lat":12.703586,"lon":124.049264,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.03,"wp":[12.70334,124.0493],"wst":"matched","br":"Tabon-tabon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5791},{"i":7452,"cid":"23FB0014","pid":"P00737386LZ","t":"Construction of River Bank Protection Works and Drainage System along Barangay Padang (Upstream), Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"INFRA BUILDERS AND SELLERS, PHILIPPINES","c":67548108.72,"abc":67548497.04,"fy":"2023","sd":"02/27/2023","cd":"2023-06-15","lat":13.20852,"lon":123.754405,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5792},{"i":7453,"cid":"22FK0041","pid":"P00620758LZ","t":"Construction of Flood Mitigation Structure of Madarag River, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":23118304.01,"abc":36451065.52,"fy":"2022","sd":"03/11/2022","cd":"2022-11-26","lat":12.986704,"lon":123.960793,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Madarag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5793},{"i":7454,"cid":"22FB0032","pid":"P00620287LZ","t":"Construction of Flood Control System, Purok 6, Quirangay, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":57898152.54,"abc":57898316.15,"fy":"2022","sd":"03/04/2022","cd":"2022-09-29","lat":13.198812,"lon":123.651356,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5794},{"i":7455,"cid":"22HF0047","pid":"P00634052VS","t":"Construction of Shoreline Protection, Barangay Daanlungsod, Tuburan, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":39146455.0,"abc":39200000.0,"fy":"2022","sd":"07/19/2022","cd":"2023-12-28","lat":10.729534,"lon":123.824906,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daanlungsod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5795},{"i":7456,"cid":"24HO0001","pid":"P00820058VS","t":"Construction of Flood Control Structure along Polo River (Downstream Left Side), Alcantara, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALCANTARA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":144745350.3,"abc":144745352.1,"fy":"2024","sd":"02/16/2024","cd":"2024-09-16","lat":9.964131,"lon":123.401001,"sm":26,"fm":26,"tm":26,"am":26,"md":0.0,"ls":"inside","ww":"Polo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5796},{"i":7457,"cid":"23F00074","pid":"P00740450LZ","t":"Construction of Flood Control Structure, Brgy. Sto. Domingo, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"WELEX CONSTRUCTION, INCORPORATED (FORMERLY WELEX C","c":106149680.2,"abc":106149680.2,"fy":"2023","sd":"05/25/2023","cd":"2023-08-31","lat":12.702683,"lon":124.051648,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Domingo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5797},{"i":7458,"cid":"22FL0022","pid":"P00631478LZ","t":"Construction of Slope Protection at Barangay Padre Diaz, Bulan, Sorsogon","w":"Construction of Revetment","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-11-12","lat":12.684739,"lon":123.961092,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padre Diaz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5798},{"i":7459,"cid":"22FB0134","pid":"P00639537LZ","t":"Construction of River Bank Protection works (downstream) of Barangay Padang, Padang, Legazpi City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":39197337.19,"abc":39198403.66,"fy":"2022","sd":"04/11/2022","cd":"2022-09-20","lat":13.20415,"lon":123.7546,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5799},{"i":7460,"cid":"22HF0036","pid":"P00620125VS","t":"Construction of Flood Mitigation Structure at Sta. Ana River, Sta. 2+530 - Sta. 2+796, Brgy. Sta. Ana, Barili, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"BARILI (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"QM BUILDERS / DOCAST CONSTRUCTION","c":39198712.68,"abc":39200000.0,"fy":"2022","sd":"08/24/2022","cd":"2023-05-04","lat":10.113918,"lon":123.513607,"sm":164,"fm":164,"tm":164,"am":164,"md":0.0,"ls":"inside","ww":"Sta. Ana","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sta. Ana","len":266.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5800},{"i":7461,"cid":"22FA0059","pid":"P00631337LZ","t":"Rehabilitation of Soa River Control Structure (Upstream - Right Side), Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":44100000.0,"abc":88199992.73,"fy":"2022","sd":"09/05/2022","cd":"2023-04-21","lat":13.337783,"lon":123.652871,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Soa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5801},{"i":7462,"cid":"22HH0044","pid":"P00630652VS","t":"Construction of Drainage System at Barangay Kalubihan, Cebu City","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"NEW GLOBALDEV CORPORATION","c":4941185.77,"abc":4950000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-24","lat":10.297611,"lon":123.900592,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kalubihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5802},{"i":7463,"cid":"24HE0053","pid":"P00820320VS","t":"Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/20/2024","cd":"2025-01-10","lat":10.276453,"lon":123.825159,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.01,"wp":[10.27639,123.82524],"wst":"matched","br":"Lagtang","len":null,"ph":"Package 3","dup":[],"run":[7469,7487,7478],"cl":[7404,7413,7421,7429,7469,7478,7487,7495],"L":"field","s":56,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24HE0051 to 24HE0054) cover the same site, together worth PHP 579,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":68},{"i":7464,"cid":"23MH0078","pid":"P00734414MN","t":"Construction of Flood Control, Brgy. Poblacion, Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-08-28","lat":6.557794,"lon":124.052318,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5803},{"i":7465,"cid":"23FN0051","pid":"P00742208LZ","t":"Construction of Flood Mitigation Structure along Barit River, Brgy. Antipolo Old Section, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":98931423.45,"abc":98932788.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-08","lat":13.408753,"lon":123.401376,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.40878,123.40146],"wst":"matched","br":"Antipolo Old Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5804},{"i":7466,"cid":"23HN0087","pid":"P00721944VS","t":"Construction of Flood Control Structure along Pitogo River, Phase III, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"KYLE CONSTRUCTION SERVICES","c":14650900.0,"abc":14700000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-05-26","lat":10.3869,"lon":123.9612,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Pitogo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5805},{"i":7467,"cid":"23FO0059","pid":"P00740468LZ","t":"Construction of Itaran River Control Structure, barangay Itaran, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":72289030.0,"abc":144610000.0,"fy":"2023","sd":"05/25/2023","cd":"2023-12-15","lat":13.328209,"lon":123.513822,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Itaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Itaran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5806},{"i":7468,"cid":"23FB0110","pid":"P00740663LZ","t":"Construction of Various Drainage System Camalig Albay 2nd DEO Albay","w":"Construction of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"FS CO BUILDERS AND SUPPLY","c":48998443.23,"abc":48998424.78,"fy":"2023","sd":"07/03/2023","cd":"2024-03-22","lat":13.18021,"lon":123.654,"sm":313,"fm":313,"tm":null,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5807},{"i":7469,"cid":"24HE0051","pid":"P00820322VS","t":"Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/20/2024","cd":"2025-04-10","lat":10.276356,"lon":123.825248,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.0,"wp":[10.27637,123.82523],"wst":"matched","br":"Lagtang","len":null,"ph":"Package 2","dup":[],"run":[7487,7463,7478],"cl":[7404,7413,7421,7429,7463,7478,7487,7495],"L":"field","s":56,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24HE0051 to 24HE0054) cover the same site, together worth PHP 579,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":69},{"i":7470,"cid":"22FL0005","pid":"P00620753LZ","t":"Construction of Flood Control Structure with Drainage Structure, Pawa, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR","c":48999228.83,"abc":98000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-03-21","lat":12.608201,"lon":124.057834,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5808},{"i":7471,"cid":"24FN0008","pid":"P00820466LZ","t":"Construction of Flood Mitigation Structure along Barit River, Antipolo Old Section, Barangay Antipolo, Nabua, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"NABUA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-12-11","lat":13.406472,"lon":123.401391,"sm":1000,"fm":1000,"tm":1000,"am":1000,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.02,"wp":[13.40645,123.40155],"wst":"matched","br":"Antipolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5809},{"i":7472,"cid":"23FO0059","pid":"P00740469LZ","t":"Construction of Itaran River Control Structure, barangay Gamot, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":72289030.0,"abc":144610000.0,"fy":"2023","sd":"05/25/2023","cd":"2023-12-15","lat":13.328039,"lon":123.513897,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Itaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gamot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5810},{"i":7473,"cid":"23HD0028","pid":"P00721529VS","t":"Construction of Seawall, Sta. 000 + 000 - Sta. 000 + 386, Medellin, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MEDELLIN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":63323300.0,"abc":63323300.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-12","lat":11.12545,"lon":123.961525,"sm":964,"fm":964,"tm":964,"am":964,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":386.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5811},{"i":7474,"cid":"22HF0007","pid":"P00620122VS","t":"Construction of Flood Mitigation Structure at Camanchilles River, Sta. 0+449 - Sta. 0+698, Brgy. Talavera, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY / PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION)","c":44272101.34,"abc":45080000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-12-01","lat":10.404294,"lon":123.654214,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Camanchilles","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talavera","len":249.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5812},{"i":7475,"cid":"22FB0049","pid":"P00632950LZ","t":"Construction of River Bank Protection Structure including Drainage System along Barangay 49 - Bigaa River (Upsteam Section), Legazpi City, Albay","w":"Construction of Drainage Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":48998381.6,"abc":48998402.13,"fy":"2022","sd":"02/21/2022","cd":"2022-07-31","lat":13.195509,"lon":123.75493,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":"Bigaa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"49","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5813},{"i":7476,"cid":"23HF0006","pid":"P00721827VS","t":"Construction of Flood Mitigation Structure at Camanchilles River, Barangay Talavera, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY / PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION)","c":48999982.85,"abc":49000000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-12-13","lat":10.403702,"lon":123.654253,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Camanchilles","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talavera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5814},{"i":7477,"cid":"22HA0076","pid":"P00620113VS","t":"Construction of Flood Mitigation Structure at Barangay Santo Rosario (Antequera) along river leading to Tubig Dako leading to Inambacan Cave and Spring, Sta. 000+000.00 - Sta. 001+000.00, Antequera, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"ANTEQUERA (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":48912420.75,"abc":49000000.0,"fy":"2022","sd":"09/22/2022","cd":"2023-09-30","lat":9.75453,"lon":123.9007,"sm":65,"fm":65,"tm":65,"am":65,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Rosario","len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5815},{"i":7478,"cid":"24HE0054","pid":"P00820321VS","t":"Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 4)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/20/2024","cd":"2025-01-10","lat":10.276878,"lon":123.825501,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.01,"wp":[10.27683,123.82557],"wst":"matched","br":"Lagtang","len":null,"ph":"Package 4","dup":[],"run":[7469,7487,7463],"cl":[7404,7413,7421,7429,7463,7469,7487,7495],"L":"field","s":56,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24HE0051 to 24HE0054) cover the same site, together worth PHP 579,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":70},{"i":7479,"cid":"23MH0020","pid":"P00721650MN","t":"Construction of River Bank Protection at Barangay Santa Clara, Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":6.532115,"lon":124.058334,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santa Clara","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5816},{"i":7480,"cid":"23HO0015","pid":"P00721522VS","t":"Construction of Revetment Wall at Sitio Parale - Sitio Luwak, Brgy. Sorsogon - Brgy. Salmeron, Malabuyoc, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96305129.41,"abc":96305217.84,"fy":"2023","sd":"02/08/2023","cd":"2023-09-26","lat":9.775888,"lon":123.514981,"sm":887,"fm":887,"tm":887,"am":476,"md":13.69,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":55,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.88,"value":13.69,"text":"The pin is 13.7 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Dalaguete, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":144},{"i":7481,"cid":"22FA0031","pid":"P00631322LZ","t":"Construction of Bulawan River Control System (San Jose/San Francisco Section), Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":44100000.0,"abc":44099984.92,"fy":"2022","sd":"04/25/2022","cd":"2022-10-07","lat":13.306581,"lon":123.755351,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Bulawan","wn":"Bulawan River","wd":0.11,"wp":[13.30654,123.7543],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[7522,7549],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22FA0031 to 22FA0033) cover the same site, together worth PHP 146,100,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":591},{"i":7482,"cid":"22HH0076","pid":"P00630651VS","t":"Construction of Drainage System at Barangay Day-as, Cebu City, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"CMDV CONSTRUCTION","c":4930064.61,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-25","lat":10.302787,"lon":123.901897,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Day-as","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5817},{"i":7483,"cid":"24HN0048","pid":"P00820328VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GONZALODO ENTERPRISES / WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":135100000.0,"abc":135100000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-06-05","lat":10.395793,"lon":123.961574,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tilhaong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5818},{"i":7484,"cid":"22FN0051","pid":"P00631428LZ","t":"Construction of Barit River Flood Mitigation Structure (Francia Section), Iriga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SISAM CONSTRUCTION & SUPPLIES","c":39189729.5,"abc":39200000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-08-15","lat":13.40934,"lon":123.40146,"sm":648,"fm":648,"tm":648,"am":1000,"md":0.02,"ls":"boundary","ww":"Barit","wn":"Barit River","wd":0.01,"wp":[13.40933,123.40136],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5819},{"i":7485,"cid":"22FL0005","pid":"P00620751LZ","t":"Construction of Flood Control Structure along Pawa River, Brgy. Pawa, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR","c":48999966.52,"abc":98000000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-03-21","lat":12.607544,"lon":124.058888,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":"Pawa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5820},{"i":7486,"cid":"22FA0076","pid":"P00639395LZ","t":"Construction of River Protection Structures at Telegrapo River, Lidong, Sto. Domingo, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":95535000.0,"abc":95534999.73,"fy":"2022","sd":"06/23/2022","cd":"2023-02-10","lat":13.24,"lon":123.755627,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"Telegrapo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5821},{"i":7487,"cid":"24HE0052","pid":"P00820323VS","t":"Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"02/20/2024","cd":"2025-01-10","lat":10.276748,"lon":123.825558,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.0,"wp":[10.27677,123.82552],"wst":"matched","br":"Lagtang","len":null,"ph":"Package 3","dup":[],"run":[7469,7463,7478],"cl":[7404,7413,7421,7429,7463,7469,7478,7495],"L":"field","s":56,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (24HE0051 to 24HE0054) cover the same site, together worth PHP 579,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."},{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":71},{"i":7488,"cid":"22F00137","pid":"P00639397LZ","t":"Construction of Shore Protection, Bahi Seawall (Phase 2), Bacacay, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":164048591.3,"abc":164048591.3,"fy":"2022","sd":"07/18/2022","cd":"2023-07-14","lat":13.239662,"lon":123.902291,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5822},{"i":7489,"cid":"24HF0046","pid":"P00820191VS","t":"Construction of Lamak Punod Sibago CIS Flood Protection Dike, Pinamungajan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"PINAMUNGAJAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":14655082.09,"abc":14700000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-09-06","lat":10.27236,"lon":123.655844,"sm":1141,"fm":1141,"tm":1141,"am":1141,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5823},{"i":7490,"cid":"22FG0040","pid":"P00631422LZ","t":"Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, San Isidro, Lagonoy, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/17/2022","cd":"2023-08-22","lat":13.919055,"lon":123.516359,"sm":736,"fm":736,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5824},{"i":7491,"cid":"23FN0050","pid":"P00742207LZ","t":"Construction of Flood Mitigation Structure along Barit River, Brgy. Francia, Iriga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":98956878.59,"abc":98966394.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-08","lat":13.40991,"lon":123.40157,"sm":648,"fm":648,"tm":648,"am":648,"md":0.0,"ls":"inside","ww":"Barit","wn":"Barit River","wd":0.02,"wp":[13.40994,123.40137],"wst":"matched","br":"Francia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5825},{"i":7492,"cid":"23FJ0013","pid":"P00726306LZ","t":"Construction of Matagangtang Flood Control, Sta. 0+119.15 - Sta. 0+308.15, Upstream Right Side, Placer, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"PLACER (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"SQUARE N CONSTRUCTION & SUPPLY","c":26818854.83,"abc":27366178.4,"fy":"2023","sd":"04/28/2023","cd":"2023-12-09","lat":11.942065,"lon":123.96248,"sm":1150,"fm":1150,"tm":1150,"am":350,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":189.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5826},{"i":7493,"cid":"23MH0079","pid":"P00734415MN","t":"Construction of Flood Control, Brgy. Tibpuan, Lebak, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LEBAK (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"JV CONSTECH","c":4356000.0,"abc":4950000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-08-01","lat":6.630946,"lon":124.059926,"sm":766,"fm":766,"tm":766,"am":766,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tibpuan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5827},{"i":7494,"cid":"23F00140","pid":"P00725883LZ","t":"Construction of Bito River Flood Mitigation Structure along Brgy. Bayanihan Poblacion (District 4), San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48249045.25,"abc":48249045.25,"fy":"2023","sd":"03/23/2023","cd":"2024-05-06","lat":12.490804,"lon":123.755809,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bayanihan Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5828},{"i":7495,"cid":"24HE0169","pid":"P00821145VS","t":"Construction of Revetment Wall along Mananga River (Left Side) at Sitio Luyungan (Upstream), Package 1, Barangay Lagtang, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QM BUILDERS","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"03/22/2024","cd":"2024-11-11","lat":10.280532,"lon":123.825782,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.02,"wp":[10.28035,123.82576],"wst":"matched","br":"Lagtang","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[7404,7413,7421,7429,7463,7469,7478,7487],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.27,"value":9,"text":"9 separate contracts name Barangay Lagtang (2023 to 2024), totalling PHP 1,022,900,000.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1035},{"i":7496,"cid":"22FL0033","pid":"P00620334LZ","t":"Rehabilitation/Improvement of Flood Mitigation at Fabrica River, Bulan, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":92639979.74,"abc":92640000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-04-26","lat":12.667544,"lon":123.902525,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Fabrica","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5829},{"i":7497,"cid":"23FL0038","pid":"P00742480LZ","t":"Construction of Flood Control Structure Brgy. Patag - Cawayan, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"RMH CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":98963028.11,"abc":99000000.0,"fy":"2023","sd":"05/22/2023","cd":"2023-12-27","lat":12.712294,"lon":124.061262,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5830},{"i":7498,"cid":"24FG0058","pid":"P00820473LZ","t":"Construction of Flood Mitigation Structure along Rangas River, Pugay, San Jose, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":93436357.49,"abc":96500000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-11-20","lat":13.6875,"lon":123.5201,"sm":1300,"fm":1300,"tm":1300,"am":1300,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.55,"wp":[13.68263,123.51889],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5831},{"i":7499,"cid":"23FK0006","pid":"P00726319LZ","t":"Construction/ Improvement of Flood Protection Measures along Tublijon River, Brgy. Tublijon, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":29399976.04,"abc":71669931.81,"fy":"2023","sd":"02/23/2023","cd":"2023-11-22","lat":12.975923,"lon":123.903402,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Tublijon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tublijon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5832},{"i":7500,"cid":"23K00019","pid":"P00721270MN","t":"Construction of Flood Mitigation Structure, Matling River, Package 3, Malabang, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"MALABANG (LANAO DEL SUR)","deo":"Lanao del Sur 2nd District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.","c":47043280.19,"abc":48250000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-10-04","lat":7.61355,"lon":124.062414,"sm":886,"fm":886,"tm":886,"am":886,"md":0.0,"ls":"inside","ww":"Matling","wn":"Matling River","wd":0.23,"wp":[7.61175,124.06354],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5833},{"i":7501,"cid":"23HO0225","pid":"P00721950VS","t":"Construction of Drainage System along Brgy. Tunga, Moalboal, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":26457957.62,"abc":26458256.0,"fy":"2023","sd":"06/27/2023","cd":"2024-03-16","lat":9.911062,"lon":123.401808,"sm":980,"fm":980,"tm":980,"am":101,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5834},{"i":7502,"cid":"23HN0064","pid":"P00721759VS","t":"Construction/Improvement of Flood Control Structure along Butuanon River (Phase VIII), Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96400000.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-10-05","lat":10.340645,"lon":123.962903,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.0,"wp":[10.34064,123.9629],"wst":"matched","br":null,"len":null,"ph":"Phase VIII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5835},{"i":7503,"cid":"22HE0035","pid":"P00620120VS","t":"Construction of Mananga River Flood Control Structure, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"W.GO CONSTRUCTION AND SUPPLY / WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-16","lat":10.270532,"lon":123.827344,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.03,"wp":[10.2704,123.82715],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5836},{"i":7504,"cid":"24KJ0109","pid":"P00835874MN","t":"Rehabilitation of Spillway, Minsubong, Tangub City, Misamis Occidental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"ABIB BUILDERS ENTERPRISE","c":4752999.94,"abc":4900000.0,"fy":"2024","sd":"06/21/2024","cd":"2025-03-28","lat":8.080227,"lon":123.75637,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5837},{"i":7505,"cid":"23FG0055","pid":"P00727382LZ","t":"Construction of Flood Mitigation Structure along Rangas River, Pugay, San Jose, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Camarines Sur 2nd District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":48996903.75,"abc":48518113.0,"fy":"2023","sd":"06/15/2023","cd":"2023-12-05","lat":13.682837,"lon":123.520166,"sm":1300,"fm":1300,"tm":1300,"am":1300,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.06,"wp":[13.68226,123.52024],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00987,"text":"Contract cost is 0.99% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":817},{"i":7506,"cid":"22G00094","pid":"P00620007VS","t":"Construction of Flood Control Structures of Andoon River (Downstream) along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"JAIME B. CHING ENTERPRISES","c":48249993.45,"abc":48250000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-11","lat":10.47997,"lon":123.40202,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Andoon","wn":"Ando-on River","wd":0.02,"wp":[10.47986,123.40193],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5838},{"i":7507,"cid":"22FA0011","pid":"P00631339LZ","t":"Rehabilitation of Soa River Flood Control (Downstream), Soa, Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":47040000.0,"abc":47039957.04,"fy":"2022","sd":"08/05/2022","cd":"2023-01-20","lat":13.350771,"lon":123.656616,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Soa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5839},{"i":7508,"cid":"22K00083","pid":"P00620039MN","t":"Construction of Flood Mitigation Structure, Matling River, Package 2, Malabang, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"MALABANG (LANAO DEL SUR)","deo":"Lanao del Sur 2nd District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP. / RENREN TRADING AND CONSTRUCTION SERVICES","c":75655911.8,"abc":77200000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-11-30","lat":7.610198,"lon":124.062566,"sm":886,"fm":886,"tm":886,"am":886,"md":0.0,"ls":"inside","ww":"Matling","wn":"Matling River","wd":0.04,"wp":[7.61023,124.06296],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5840},{"i":7509,"cid":"23FI0024","pid":"P00725890LZ","t":"Construction of Calasuche Seawall, Sta. 1+286.90.00 - Sta. 1+361.90, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":57900000.0,"abc":57899970.85,"fy":"2023","sd":"08/09/2023","cd":"2024-04-06","lat":12.214384,"lon":123.520523,"sm":974,"fm":974,"tm":974,"am":974,"md":0.07,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5841},{"i":7510,"cid":"23FF0004","pid":"P00725906LZ","t":"Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Right Side, Downstream of Hibago Bridge, Brgy. Hibago, Ocampo, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"OCAMPO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":57067962.0,"abc":57673534.38,"fy":"2023","sd":"02/20/2023","cd":"2023-09-20","lat":13.56014,"lon":123.402288,"sm":1033,"fm":1033,"tm":1033,"am":1033,"md":0.0,"ls":"inside","ww":"Hibago","wn":"Hibago River","wd":0.02,"wp":[13.56022,123.40242],"wst":"matched","br":"Hibago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5842},{"i":7511,"cid":"21FA0038","pid":"P00561583LZ","t":"Construction/Extension of Soa River Control (Upstream Right Side), Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Malinao","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":9900000.0,"abc":29699985.6,"fy":"2021","sd":"04/19/2022","cd":"2022-09-15","lat":13.342005,"lon":123.657344,"sm":897,"fm":null,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Soa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5843},{"i":7512,"cid":"22KF0014","pid":"P00620143MN","t":"Construction of Slope Protection along Barogohan Bridge, (Downstream), Sta. 0+000.00 - Sta. 0+280.00, Maigo, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-12","lat":8.16611,"lon":123.963333,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5844},{"i":7513,"cid":"24FB0079","pid":"P00844582LZ","t":"Construction of River Bank Protection Works and Drainage System along Purok 3 Sitio Laom, Barangay Padang, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"INFRA BUILDERS AND SELLERS, PHILIPPINES","c":96498856.25,"abc":96498889.05,"fy":"2024","sd":"04/12/2024","cd":"2024-09-22","lat":13.212396,"lon":123.756861,"sm":768,"fm":768,"tm":768,"am":1411,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Padang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5845},{"i":7514,"cid":"22H00041","pid":"P00632991VS","t":"Construction of Flood Mitigation Structure along Mananga River (Upper Side), Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":135100000.0,"abc":135100000.0,"fy":"2022","sd":"04/18/2022","cd":"2022-12-15","lat":10.26865,"lon":123.82858,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.0,"wp":[10.26865,123.82858],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5846},{"i":7515,"cid":"22HF0038","pid":"P00630224VS","t":"Construction of Flood Mitigation Structure at Barangay Bakyawan, Sta. 0+000 - Sta. 0+412, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48985440.67,"abc":49000000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-03-03","lat":10.635889,"lon":123.832013,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bakyawan","len":412.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5847},{"i":7516,"cid":"23HH0066","pid":"P00721778VS","t":"Construction of Flood Mitigation Structure along Lahug River, Barangay Zapatera & Lorega, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":57124194.51,"abc":57200000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-11-20","lat":10.304061,"lon":123.903425,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Lahug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zapatera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5848},{"i":7517,"cid":"23HN0107","pid":"P00733740VS","t":"Construction of Flood Control Project, Brgy. Caubian, Olango Island, Lapu-Lapu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LAPU-LAPU CITY (OPON) (CEBU)","deo":"Cebu 6th District Engineering Office","co":"FLORIANE CONSTRUCTION CORPORATION (FORMERLY: FLORIANE CONSTRUCTION & SUPPLY)","c":17752004.0,"abc":17820000.0,"fy":"2023","sd":"05/11/2023","cd":"2023-09-21","lat":10.263472,"lon":124.062687,"sm":754,"fm":754,"tm":754,"am":754,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caubian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5849},{"i":7518,"cid":"23FG0054","pid":"P00740682LZ","t":"Construction of Flood Mitigation Structure along Rangas River, Brgy. Mampirao, San Jose, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":48518100.0,"abc":48518100.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-17","lat":13.676751,"lon":123.520754,"sm":1300,"fm":1300,"tm":1300,"am":1300,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.52,"wp":[13.67975,123.52446],"wst":"matched","br":"Mampirao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5850},{"i":7519,"cid":"23FF0008","pid":"P00726984LZ","t":"Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Left Side, Downstream of Hibago Bridge, Brgy. Pinit, Ocampo, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"OCAMPO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":57228490.0,"abc":57821156.98,"fy":"2023","sd":"03/22/2023","cd":"2023-10-20","lat":13.560218,"lon":123.402527,"sm":1033,"fm":1033,"tm":1033,"am":1033,"md":0.0,"ls":"inside","ww":"Hibago","wn":"Hibago River","wd":0.01,"wp":[13.56017,123.40245],"wst":"matched","br":"Pinit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5851},{"i":7520,"cid":"22HD0039","pid":"P00620041VS","t":"Construction of Seawall, Medellin, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MEDELLIN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":57735950.0,"abc":57735950.0,"fy":"2022","sd":"03/06/2022","cd":"2022-11-14","lat":11.125611,"lon":123.963758,"sm":964,"fm":964,"tm":964,"am":964,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5852},{"i":7521,"cid":"24HD0032","pid":"P00820185VS","t":"Construction of Flood Control Structure at Aningan Bridge, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN REMIGIO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-11","lat":10.92637,"lon":123.90366,"sm":1355,"fm":1355,"tm":1355,"am":1355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5853},{"i":7522,"cid":"22FA0032","pid":"P00631327LZ","t":"Construction of Flood Control System of Bulawan River Control (San Jose/Binitayan Section), Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.","c":44100000.0,"abc":44099919.19,"fy":"2022","sd":"07/25/2022","cd":"2023-01-06","lat":13.300458,"lon":123.756892,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Bulawan","wn":"Bulawan River","wd":0.03,"wp":[13.30042,123.75665],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[7481,7549],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22FA0031 to 22FA0033) cover the same site, together worth PHP 146,100,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":592},{"i":7523,"cid":"23HE0097","pid":"P00721762VS","t":"Construction of Mananga River Flood Control Structure, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96484888.0,"abc":96500000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-09-11","lat":10.246031,"lon":123.83436,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.0,"wp":[10.24603,123.83436],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5854},{"i":7524,"cid":"21HC0021","pid":"P00521779VS","t":"Construction of Inabanga Flood Control, Inabanga, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"Inabanga","deo":"Bohol 2nd District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":38703951.53,"abc":40158440.0,"fy":"2021","sd":"04/15/2021","cd":"2022-11-30","lat":10.028795,"lon":124.068708,"sm":639,"fm":null,"tm":639,"am":639,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5855},{"i":7525,"cid":"22FI0039","pid":"P00620280LZ","t":"Construction of Calasuche Seawall, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":96500000.0,"abc":96499953.61,"fy":"2022","sd":"03/30/2022","cd":"2023-07-30","lat":12.214278,"lon":123.521194,"sm":974,"fm":974,"tm":974,"am":974,"md":0.07,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5856},{"i":7526,"cid":"22HO0049","pid":"P00620447VS","t":"Improvement of Riverbank along Polo River, Sta. 0 + 000 - Sta. 0 + 700, Alcantara, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALCANTARA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96499953.35,"abc":96499953.35,"fy":"2022","sd":"03/24/2022","cd":"2022-12-16","lat":9.969659,"lon":123.402651,"sm":26,"fm":26,"tm":26,"am":26,"md":0.0,"ls":"inside","ww":"Polo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5857},{"i":7527,"cid":"22FA0008","pid":"P00630997LZ","t":"Rehabilitation of Revetment along Quinale River, Downstream of Comun Bridge, Left Side, Barangay Comun - Ogob, Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":48250000.0,"abc":48249198.58,"fy":"2022","sd":"03/18/2022","cd":"2022-09-04","lat":13.345886,"lon":123.657694,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Quinale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Comun","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5858},{"i":7528,"cid":"22FL0032","pid":"P00620333LZ","t":"Rehabilitation/Improvement of Flood Mitigation at Bulawan River, Irosin, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":95380291.78,"abc":96500000.0,"fy":"2022","sd":"02/15/2022","cd":"2023-04-16","lat":12.729658,"lon":123.963822,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Bulawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5859},{"i":7529,"cid":"22FM0017","pid":"P00631462LZ","t":"Construction of Flood Mitigation Structure at Bito River, Sitio Arado, Brgy. Curbada, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / 3RB CONSTRUCTION & SUPPLY","c":46549610.06,"abc":49000000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-07-25","lat":12.491944,"lon":123.757222,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Curbada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5860},{"i":7530,"cid":"22HE0033","pid":"P00620030VS","t":"Construction of Flood Control Structure, Mananga River, Sta. 0+000 - Sta. 0+331 (both side), Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-12-19","lat":10.245983,"lon":123.834537,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.01,"wp":[10.24609,123.83447],"wst":"matched","br":null,"len":331.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5861},{"i":7531,"cid":"23FA0039","pid":"P00740656LZ","t":"Construction of Flood Mitigation Structure, Labnig National High School, Brgy. Labnig, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":47040000.0,"abc":95059998.36,"fy":"2023","sd":"05/09/2023","cd":"2023-10-27","lat":13.22,"lon":123.403853,"sm":897,"fm":897,"tm":897,"am":782,"md":24.16,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labnig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":24.16,"text":"The pin is 24.2 km outside Malinao, Albay, the nearest municipality the record claims. It falls in Libon, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":106},{"i":7532,"cid":"22FI0041","pid":"P00620295LZ","t":"Construction of Poblacion East Seawall, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"YAKAL CONSTRUCTION","c":96500000.0,"abc":96499920.1,"fy":"2022","sd":"02/16/2022","cd":"2023-04-27","lat":12.338564,"lon":123.657759,"sm":974,"fm":974,"tm":974,"am":981,"md":12.06,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.86,"value":12.06,"text":"The pin is 12.1 km outside Milagros, Masbate, the nearest municipality the record claims. It falls in Mobo, Masbate.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":138},{"i":7533,"cid":"22HH0066","pid":"P00620433VS","t":"Construction of Flood Mitigation Structure at Brgy. Basak San Nicolas, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-24","lat":10.301793,"lon":123.903755,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basak San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5862},{"i":7534,"cid":"23FL0006","pid":"P00726318LZ","t":"Construction of Flood Protection Measures, Brgy. Culasi, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":28317826.74,"abc":68600000.0,"fy":"2023","sd":"05/15/2023","cd":"2023-11-22","lat":12.540913,"lon":124.074584,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culasi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5863},{"i":7535,"cid":"22FL0019","pid":"P00631474LZ","t":"Construction of Flood Mitigation Project (Upstream) in Barangay Bulawan, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":47363531.26,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-02","lat":12.73,"lon":123.964444,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":511},{"i":7536,"cid":"23F00141","pid":"P00725882LZ","t":"Construction of Bito River Flood Mitigation Structure along Brgy. Corbada, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48249363.78,"abc":48249363.78,"fy":"2023","sd":"03/24/2023","cd":"2024-02-02","lat":12.489868,"lon":123.757364,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Corbada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5864},{"i":7537,"cid":"22FG0020","pid":"P00631423LZ","t":"Construction of Flood Mitigation Structure along Mapanag River, Sagñay, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAGÑAY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-10-07","lat":13.598947,"lon":123.52225,"sm":1235,"fm":1235,"tm":1235,"am":1235,"md":0.0,"ls":"inside","ww":"Mapanag","wn":"Mapanag Creek","wd":0.01,"wp":[13.59901,123.52229],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5865},{"i":7538,"cid":"23HO0070","pid":"P00721945VS","t":"Construction of Revetment Wall with Rechannelling Works along Polo River (Upstream), Alcantara, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALCANTARA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48605990.17,"abc":48606241.83,"fy":"2023","sd":"03/06/2023","cd":"2023-08-17","lat":9.961906,"lon":123.404745,"sm":26,"fm":26,"tm":26,"am":26,"md":0.0,"ls":"inside","ww":"Polo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5866},{"i":7539,"cid":"24HA0027","pid":"P00820044VS","t":"Construction of Bateria River Flood Control, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":69866876.96,"abc":70022330.0,"fy":"2024","sd":"04/11/2024","cd":"2024-11-05","lat":9.951,"lon":123.9657,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":"Bateria","wn":"Bateria River","wd":0.02,"wp":[9.95098,123.96585],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5867},{"i":7540,"cid":"22FK0048","pid":"P00631485LZ","t":"Rehabilitation of Revetment along Tublijon River, Sorsogon City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":19597043.51,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":12.978505,"lon":123.903861,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Tublijon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5868},{"i":7541,"cid":"22FA0059","pid":"P00631338LZ","t":"Rehabilitation of Soa River Control Structure (Upstream), Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"WEARR ENTERPRISES & DEVELOPMENT CORP.","c":44100000.0,"abc":88199992.73,"fy":"2022","sd":"09/05/2022","cd":"2023-04-21","lat":13.340339,"lon":123.65861,"sm":897,"fm":897,"tm":897,"am":423,"md":0.04,"ls":"boundary","ww":"Soa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5869},{"i":7542,"cid":"23K00232","pid":"P00735054MN","t":"Construction of Maligo River Flood Control, Maligo, Pualas, Lanao Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"PUALAS (LANAO DEL SUR)","deo":"Lanao del Sur 2nd District Engineering Office","co":"AL HUSSEIN CONSTRUCTION","c":48763650.33,"abc":49500000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-03-14","lat":7.8116,"lon":124.0809,"sm":1177,"fm":1177,"tm":1177,"am":1177,"md":0.0,"ls":"inside","ww":"Maligo","wn":"Maligo River","wd":0.03,"wp":[7.81183,124.08087],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5870},{"i":7543,"cid":"24HF0006","pid":"P00820346VS","t":"Construction of Flood Mitigation Structure at Guinabasan River, Barangay Sta. Lucia - Barangay Bago, Asturias, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ASTURIAS (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":96341651.25,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-11-20","lat":10.6296,"lon":123.758367,"sm":79,"fm":79,"tm":79,"am":79,"md":0.0,"ls":"inside","ww":"Guinabasan","wn":"Ginabasan River","wd":0.02,"wp":[10.62943,123.75838],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5871},{"i":7544,"cid":"22KF0103","pid":"P00634134MN","t":"Construction of Retaining Wall and Line Canal along Bulod-Kakai Renabor-Torongtorong Road in Tubod, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"INSTA BUILDERS & SUPPLIES CORP","c":8696543.7,"abc":14850000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-08-20","lat":8.051973,"lon":123.834638,"sm":1595,"fm":1595,"tm":null,"am":1595,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5872},{"i":7545,"cid":"23FN0007","pid":"P00736111LZ","t":"Construction of Bank Protection Structure, Brgy. Jose Baybayon-Monte Calvario, Buhi, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BUHI (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":77155504.0,"abc":77155504.0,"fy":"2023","sd":"02/16/2023","cd":"2024-01-02","lat":13.41965,"lon":123.52237,"sm":246,"fm":246,"tm":246,"am":246,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jose Baybayon-Monte Calvario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5873},{"i":7546,"cid":"23FF0047","pid":"P00726964LZ","t":"Construction of Revetment along Downstream of Hamorawon Bridge, Pili, Camarines Sur","w":"Construction of Revetment","rg":"Region V","pv":"CAMARINES SUR","mu":"PILI (CAPITAL) (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"ELKANKONSTRAK DEVELOPMENT CORPORATION","c":95114888.2,"abc":96204617.75,"fy":"2023","sd":"05/09/2023","cd":"2024-02-18","lat":13.55826,"lon":123.4053,"sm":1137,"fm":1137,"tm":1137,"am":1033,"md":7.86,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7550],"run":[],"cl":[],"L":"records","s":79,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.86,"text":"The pin is 7.9 km outside Pili, Camarines Sur, the nearest municipality the record claims. It falls in Ocampo, Camarines Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 143,578,530.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":22},{"i":7547,"cid":"22HA0088","pid":"P00620112VS","t":"Construction of Flood Mitigation Structure at Barangay Busao (Maribojoc) along river leading to Tubig Daku leading to Inambacan Cave and Spring - Sta. 000+000.00 - Sta. 000+544.274, Maribojoc, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"MARIBOJOC (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"HERBERT MALMIS GENERAL MERCHANDISING & CONTRACTOR","c":42347760.0,"abc":42347760.0,"fy":"2022","sd":"06/14/2022","cd":"2023-03-07","lat":9.748269,"lon":123.90388,"sm":939,"fm":939,"tm":939,"am":939,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Busao","len":544.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5874},{"i":7548,"cid":"22FL0042","pid":"P00630968LZ","t":"Construction of Flood Control Structure along Rangas River, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":65526866.97,"abc":67550000.0,"fy":"2022","sd":"05/27/2022","cd":"2023-05-09","lat":12.581378,"lon":124.082614,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":"Rangas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5875},{"i":7549,"cid":"22FA0033","pid":"P00630959LZ","t":"Construction of Bulawan River Control System (San Francisco/Binitayan Section), Malilipot, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":57900000.0,"abc":57899994.48,"fy":"2022","sd":"04/25/2022","cd":"2022-10-26","lat":13.3187,"lon":123.758555,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":"Bulawan","wn":"Bulawan River","wd":0.59,"wp":[13.31621,123.7537],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[7481,7522],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22FA0031 to 22FA0033) cover the same site, together worth PHP 146,100,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":449},{"i":7550,"cid":"23FF0054","pid":"P00727219LZ","t":"Construction of Hibago Flood Control, Ocampo, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"OCAMPO (CAMARINES SUR)","deo":"Camarines Sur 3rd District Engineering Office","co":"FP5 CONSTRUCTION & DEVELOPMENT CORPORATION (FORMERLY: JS & V ENTERPRISES GENERAL CONTRACTOR, INC.) / PHILWORKS CONSTRUCTION & SUPPLY","c":48463641.53,"abc":48999995.42,"fy":"2023","sd":"05/26/2023","cd":"2024-07-04","lat":13.55826,"lon":123.4053,"sm":1033,"fm":1033,"tm":1033,"am":1033,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7546],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 143,578,530.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":162},{"i":7551,"cid":"22HF0054","pid":"P00634037VS","t":"Construction of Flood Mitigation Structure at Barangay Alegria, Sta. 5+587 - Sta. 6+240, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48696738.3,"abc":49000000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-11-03","lat":10.703829,"lon":123.836477,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alegria","len":653.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5876},{"i":7552,"cid":"24HN0092","pid":"P00834655VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Nangka (Phase III), Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GONZALODO ENTERPRISES","c":48970000.0,"abc":49000000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-06-19","lat":10.369075,"lon":123.967713,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nangka","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5877},{"i":7553,"cid":"22HA0078","pid":"P00620114VS","t":"Construction of Flood Mitigation Structures along river leading to Tubig Daku leading to Inambacan Cave and Spring, Busao, Maribojoc, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"MARIBOJOC (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"D' 5J CONSTRUCTION & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-02-17","lat":9.744372,"lon":123.903943,"sm":939,"fm":939,"tm":939,"am":65,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5878},{"i":7554,"cid":"23HF0076","pid":"P00733738VS","t":"Construction of Spillway at Purok 2, Harag, Barangay Talavera, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"YBK CONSTRUCTION","c":4938269.0,"abc":4950000.0,"fy":"2023","sd":"07/03/2023","cd":"2023-09-15","lat":10.40944,"lon":123.65935,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talavera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5879},{"i":7555,"cid":"23FL0039","pid":"P00742482LZ","t":"Construction of Flood Mitigation Structure Barangay Poropandan, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"KYLA CONSTRUCTION SUPPLY","c":4753294.14,"abc":4950000.0,"fy":"2023","sd":"05/15/2023","cd":"2023-07-19","lat":12.547369,"lon":124.083583,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poropandan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5880},{"i":7556,"cid":"23FO0041","pid":"P00740678LZ","t":"Construction of Maynaga River Control Structure, Maynaga, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":48930000.0,"abc":97860000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-12-27","lat":13.34052,"lon":123.52238,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Maynaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5881},{"i":7557,"cid":"23FK0028","pid":"P00727227LZ","t":"Construction of Seawall, Brgy. Buenavista, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":19599999.83,"abc":56939964.51,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":12.861373,"lon":123.759243,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5882},{"i":7558,"cid":"22HF0037","pid":"P00634036VS","t":"Construction of Flood Mitigation Structure at Barangay Alegria, Sta. 6+200 - Sta. 6+398, Tuburan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES","c":48998099.5,"abc":49000000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-06-01","lat":10.703855,"lon":123.83685,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alegria","len":198.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5883},{"i":7559,"cid":"23FK0048","pid":"P00725897LZ","t":"Construction/ Rehabilitation of Flood Protection Measures along Osiao River Control (Upstream), Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":93086138.67,"abc":96499985.49,"fy":"2023","sd":"05/12/2023","cd":"2024-03-22","lat":13.091512,"lon":123.967739,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Osiao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5884},{"i":7560,"cid":"23FB0134","pid":"P00740477LZ","t":"Construction of River Bank Protection Works along Barangay Nagotgot, Manito, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"MANITO (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":72197542.53,"abc":72197651.67,"fy":"2023","sd":"05/17/2023","cd":"2023-11-12","lat":13.098003,"lon":123.904782,"sm":919,"fm":919,"tm":919,"am":919,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nagotgot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5885},{"i":7561,"cid":"22HD0016","pid":"P00620022VS","t":"Construction of Flood Control Structure along Bangon River, Medellin, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MEDELLIN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-14","lat":11.148529,"lon":123.967813,"sm":964,"fm":964,"tm":964,"am":964,"md":0.0,"ls":"inside","ww":"Bangon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5886},{"i":7562,"cid":"23MH0018","pid":"P00721317MN","t":"Construction of River Bank Protection/Flood Control at Limulan River (Downstream), Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"MUST ENTERPRISES / ALBANOR CONSTRUCTION","c":96499839.71,"abc":96500000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-11-17","lat":6.550252,"lon":124.084811,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":"Limulan","wn":"Limulan River","wd":0.02,"wp":[6.55041,124.08492],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5887},{"i":7563,"cid":"22FI0025","pid":"P00620743LZ","t":"Rehabilitation/Improvement of Lanang River Control, Aroroy, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"AROROY (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":34188561.03,"abc":34192148.92,"fy":"2022","sd":"02/11/2022","cd":"2022-09-15","lat":12.399323,"lon":123.407207,"sm":75,"fm":75,"tm":75,"am":75,"md":0.0,"ls":"inside","ww":"Lanang","wn":"Lanang River","wd":0.02,"wp":[12.39917,123.40705],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5888},{"i":7564,"cid":"23F00006","pid":"P00726627LZ","t":"Construction of Nabonton River Flood Mitigation Structure (Barangay Tomolin), Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":125406649.0,"abc":125406649.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-16","lat":13.234837,"lon":123.524465,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Nabonton","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tomolin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5889},{"i":7565,"cid":"22FM0015","pid":"P00631461LZ","t":"Construction of Flood Mitigation Structure at Bito River (Downstream), Brgy. Curbada, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / 3RB CONSTRUCTION & SUPPLY","c":46549010.81,"abc":49000000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-08-09","lat":12.488889,"lon":123.760278,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Curbada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5890},{"i":7566,"cid":"23FK0028","pid":"P00742486LZ","t":"Construction/Rehabilitation of Seawall, Brgy. Cawit Extension, Magallanes, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MAGALLANES (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":4949998.43,"abc":56939964.51,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":12.823084,"lon":123.837015,"sm":862,"fm":862,"tm":862,"am":862,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cawit Extension","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5891},{"i":7567,"cid":"23FG0077","pid":"P00740445LZ","t":"Construction of Flood Mitigation structure along Sagñay River Brgy. del Carmen, Sagñay, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":66875340.0,"abc":66875340.0,"fy":"2023","sd":"05/15/2023","cd":"2024-03-05","lat":13.59392,"lon":123.52517,"sm":1235,"fm":1300,"tm":1235,"am":1235,"md":0.0,"ls":"inside","ww":"Sagñay","wn":"Sagñay River","wd":0.06,"wp":[13.59338,123.52524],"wst":"matched","br":"del Carmen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":4.72,"text":"The record contradicts itself: the title and the pin point to Sagñay, Camarines Sur, but the municipality field names San Jose, Camarines Sur, 5 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":512},{"i":7568,"cid":"23HH0116","pid":"P00732027VS","t":"Construction of Flood Mitigation Structure, Barangay T. Padilla, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"CELJEM CONSTRUCTION & DEVELOPMENT CORP.","c":4935000.0,"abc":4950000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-02-22","lat":10.304572,"lon":123.905392,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"T. Padilla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5892},{"i":7569,"cid":"23F00025","pid":"P00727328LZ","t":"Construction of Revetment along Quinale River, Downstream of Comun Bridge, Left Side, Barangay Ogob, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":101324139.6,"abc":101324236.0,"fy":"2023","sd":"03/30/2023","cd":"2024-02-27","lat":13.353888,"lon":123.660784,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Quinale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ogob","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5893},{"i":7570,"cid":"24HA0001","pid":"P00832221VS","t":"Construction of Talenceras Flood Control at Talenceras, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"SILVERWOLVES CONSTRUCTION CORPORATION","c":144312978.9,"abc":144750000.0,"fy":"2024","sd":"04/11/2024","cd":"2025-02-22","lat":9.9459,"lon":123.9682,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5894},{"i":7571,"cid":"23FL0052","pid":"P00742481LZ","t":"Rehabilitation of Swamp and Construction of River Flood Protection Structure at Brgys. Caloocan, Camcaman, Camachiles and Tablac, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CARMIG CONSTRUCTION & SUPPLY","c":11523308.3,"abc":11880000.0,"fy":"2023","sd":"06/09/2023","cd":"2023-10-06","lat":12.585876,"lon":124.084852,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5895},{"i":7572,"cid":"24FO0100","pid":"P00823602LZ","t":"Construction of Flood Control Structure (Facing Downstream along River Dam Section) Zone 1, Barangay Sta. Cruz, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"06/10/2024","cd":"2025-04-05","lat":13.319067,"lon":123.407847,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5896},{"i":7573,"cid":"22FL0007","pid":"P00620755LZ","t":"Construction of Flood Control Structure, Brgy. Naagtan, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":47205646.64,"abc":98000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-10-14","lat":12.872517,"lon":124.08635,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Naagtan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5897},{"i":7574,"cid":"23HF0039","pid":"P00721821VS","t":"Rehabilitation of Flood Mitigation Structure at Sapangdaku River, Barangay Ilihan, Toledo City, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY","c":19599992.8,"abc":19600000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-09-28","lat":10.383099,"lon":123.661213,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ilihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5898},{"i":7575,"cid":"21FA0042","pid":"P00561193LZ","t":"Construction of a Seawall at the Island barangay of Nahapunan in Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":null,"deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":11880000.0,"abc":24619763.98,"fy":"2021","sd":"04/26/2022","cd":"2022-09-17","lat":13.264517,"lon":123.837624,"sm":null,"fm":null,"tm":null,"am":88,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"of Nahapunan in Bacacay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":153},{"i":7576,"cid":"24HE0158","pid":"P00821150VS","t":"Construction of Abuno River Flood Control Structure, Naga City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF NAGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":54163972.77,"abc":54364240.0,"fy":"2024","sd":"02/23/2024","cd":"2024-10-07","lat":10.261991,"lon":123.760359,"sm":408,"fm":408,"tm":408,"am":979,"md":0.04,"ls":"boundary","ww":"Abuno","wn":"Abuno River","wd":0.01,"wp":[10.26192,123.76034],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5899},{"i":7577,"cid":"23FO0041","pid":"P00740679LZ","t":"Construction of Itaran River Control Structure, barangay Buyo, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":48930000.0,"abc":97860000.0,"fy":"2023","sd":"06/01/2023","cd":"2023-12-27","lat":13.322262,"lon":123.525378,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":"Itaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5900},{"i":7578,"cid":"24KI0001","pid":"P00820155MN","t":"Construction of Jimenez CIS Protection Dike, Jimenez, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"JIMENEZ (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"SGM CONSTRUCTION","c":9799878.8,"abc":9800000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-04","lat":8.3282,"lon":123.83772,"sm":669,"fm":669,"tm":669,"am":669,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5901},{"i":7579,"cid":"22HH0069","pid":"P00630659VS","t":"Construction of Drainage System at Barangay T. Padilla, Cebu City","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":4929981.5,"abc":4950000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-07-18","lat":10.303606,"lon":123.905456,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"T. Padilla","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5902},{"i":7580,"cid":"23FL0029","pid":"P00740685LZ","t":"Construction of Flood Control Structure, Purok 2 & 3, Barangay Lajong, Juban, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"JUBAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"FULLEROS BOTOX BUILDERS AND DESIGN","c":23765326.79,"abc":24500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-31","lat":12.82477,"lon":123.968399,"sm":680,"fm":680,"tm":680,"am":680,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lajong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5903},{"i":7581,"cid":"22HO0004","pid":"P00620040VS","t":"Construction of Poblacion Ronda Seawall, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"WORLDWIDE BUILDERS / QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":48992790.68,"abc":48992790.68,"fy":"2022","sd":"02/10/2022","cd":"2022-09-30","lat":10.001738,"lon":123.408376,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5904},{"i":7582,"cid":"22FL0026","pid":"P00632973LZ","t":"Construction of Flood Control Structure, Barangay Naagtan, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"RMH CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":29067904.86,"abc":49500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-03","lat":12.872483,"lon":124.0865,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Naagtan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5905},{"i":7583,"cid":"22FA0047","pid":"P00631333LZ","t":"Rehabilitation of Bulawan Flood Control, San Francisco Section, Malilipot, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALILIPOT (ALBAY)","deo":"Albay 1st District Engineering Office","co":"RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.","c":43120000.0,"abc":95229997.38,"fy":"2022","sd":"08/05/2022","cd":"2023-04-01","lat":13.309866,"lon":123.761272,"sm":895,"fm":895,"tm":895,"am":895,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5906},{"i":7584,"cid":"22F00102","pid":"P00620332LZ","t":"Rehabilitation/ Improvement of Revetment along Quinale River, Downstream of Comun Bridge, Left Side, Brgy. Comun-Ogob, Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":101325000.0,"abc":101324983.0,"fy":"2022","sd":"03/21/2022","cd":"2023-02-10","lat":13.353655,"lon":123.661289,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Quinale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Comun-Ogob","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5907},{"i":7585,"cid":"23HE0005","pid":"P00732022VS","t":"Construction of Flood Control, Tabunok, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"PLANAC CONSTRUCTION","c":4940000.0,"abc":4950000.0,"fy":"2023","sd":"02/15/2023","cd":"2023-05-26","lat":10.266581,"lon":123.839013,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5908},{"i":7586,"cid":"23MH0019","pid":"P00721318MN","t":"Construction of River Bank Protection/Flood Control at Limulan River (Upstream), Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"MUST ENTERPRISES / ALBANOR CONSTRUCTION","c":71120500.88,"abc":96500000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-12-07","lat":6.545586,"lon":124.090944,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":"Limulan","wn":"Limulan River","wd":0.02,"wp":[6.5455,124.09082],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5909},{"i":7587,"cid":"22HH0009","pid":"P00620033VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Brgy. Pulangbato, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"UKC BUILDERS, INC. / ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-02-23","lat":10.297671,"lon":123.905995,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":6.31,"wp":[10.34561,123.93733],"wst":"matched","br":"Pulangbato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.31,"text":"The title names Butuanon, which OpenStreetMap maps through the stated municipality, but the pin is 6.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":237},{"i":7588,"cid":"23FL0051","pid":"P00740686LZ","t":"Construction of Flood Control Structure, Purok 1, Barangay Lajong, Juban, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"JUBAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"FULLEROS BOTOX BUILDERS AND DESIGN","c":19027799.48,"abc":19600000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-31","lat":12.824711,"lon":123.968429,"sm":680,"fm":680,"tm":680,"am":680,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lajong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5910},{"i":7589,"cid":"22FG0002","pid":"P00631424LZ","t":"Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAGÑAY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"IA FERRER CONSTRUCTION & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-11-21","lat":13.601782,"lon":123.527093,"sm":1235,"fm":1235,"tm":1235,"am":1235,"md":0.0,"ls":"inside","ww":"Sagnay","wn":"Sagñay River","wd":0.08,"wp":[13.60184,123.5278],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5911},{"i":7590,"cid":"22FN0090","pid":"P00640582LZ","t":"Construction of Balos River Flood Mitigation Structure (Downstream), Barangay San Francisco, Iriga City, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":48109727.57,"abc":49500000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-27","lat":13.4138,"lon":123.4088,"sm":648,"fm":648,"tm":648,"am":648,"md":0.0,"ls":"inside","ww":"Balos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5912},{"i":7591,"cid":"22KJ0047","pid":"P00620156MN","t":"Construction of Drainage System, Clarin, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"CLARIN (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"GRACE CONSTRUCTION CORPORATION","c":37239055.24,"abc":39200000.0,"fy":"2022","sd":"04/04/2022","cd":"2024-03-24","lat":8.266016,"lon":123.842943,"sm":440,"fm":440,"tm":440,"am":1459,"md":3.88,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7596],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.7,"value":3.88,"text":"The pin is 3.9 km outside Clarin, Misamis Occidental, the nearest municipality the record claims. It falls in Sinacaban, Misamis Occidental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 84,769,055.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":79},{"i":7592,"cid":"23FH0045","pid":"P00740683LZ","t":"Construction of Sea Wall, Comagaycay, San Andres, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN ANDRES (CALOLBON) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":48232154.04,"abc":48999999.48,"fy":"2023","sd":"07/28/2023","cd":"2024-02-06","lat":13.63292,"lon":124.0912,"sm":1254,"fm":1254,"tm":1254,"am":1254,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5913},{"i":7593,"cid":"23HI0063","pid":"P00744360VS","t":"Rehabilitation of FC Structure along Cotcot River (Upstream), Brgy. Cabadiangan, Compostela, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"COMPOSTELA (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":31005336.24,"abc":31061420.0,"fy":"2023","sd":"03/30/2023","cd":"2023-08-26","lat":10.450162,"lon":123.969456,"sm":446,"fm":446,"tm":446,"am":446,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabadiangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5914},{"i":7594,"cid":"23FA0027","pid":"P00742467LZ","t":"Construction of River Protection Structures at Telegrapo River (Downstream), Lidong , Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":99000000.0,"abc":98999999.4,"fy":"2023","sd":"04/12/2023","cd":"2023-10-26","lat":13.214715,"lon":123.763286,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"Telegrapo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5915},{"i":7595,"cid":"22HO0076","pid":"P00633004VS","t":"Construction of Revetment Wall along Brgy. Talaba River Flood Control, Ronda, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"ALCANTARA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS / FIRST GRANDEUR BUILDERS","c":48999991.18,"abc":48999991.18,"fy":"2022","sd":"03/23/2022","cd":"2022-10-27","lat":10.002824,"lon":123.410486,"sm":1214,"fm":26,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Brgy. Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talaba River Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5916},{"i":7596,"cid":"22KJ0069","pid":"P00620160MN","t":"Construction of Slope Protection along Ozamis-Oroquieta Road, Upstream & Downstream of Tigdok Bridge,Tudela and Sinacaban, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TUDELA (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47530000.0,"abc":49000000.0,"fy":"2022","sd":"03/29/2022","cd":"2024-02-18","lat":8.266016,"lon":123.842943,"sm":1601,"fm":1601,"tm":null,"am":1459,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7591],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 84,769,055.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":177},{"i":7597,"cid":"24FO0082","pid":"P00844565LZ","t":"Construction of Flood Control Structure along Box Culvert, Barangay Lidong, Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":144749802.6,"abc":144750000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-01-15","lat":13.346652,"lon":123.528108,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lidong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5917},{"i":7598,"cid":"22HH0008","pid":"P00620134VS","t":"Construction of Flood Mitigation Structure along Lahug River, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"GONZALODO ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-11-22","lat":10.398574,"lon":123.906071,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Lahug","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5918},{"i":7599,"cid":"23HO0005","pid":"P00731619VS","t":"Construction of Flood Wall Structures, Barangay Sorsogon - Barangay Salmeron (Left Side), Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":95722592.49,"abc":95723452.13,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":9.998748,"lon":123.411385,"sm":887,"fm":887,"tm":887,"am":1214,"md":33.03,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[7606,7613,7623,7631,7632],"run":[6627,6656,6662],"cl":[],"L":"records","s":88,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.03,"text":"The pin is 33.0 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (23HO0001 to 23HO0005) cover the same site, together worth PHP 298,631,246.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":4},{"i":7600,"cid":"23FI0016","pid":"P00726299LZ","t":"Construction of Flood Control System along Bañadero River, Sta. 4+222.00 - Sta. 4+550.00 (Upstream, Right Side), Mobo, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MOBO (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / EJ CANTORIA CONSTRUCTION & SUPPLY","c":49000000.0,"abc":48999989.53,"fy":"2023","sd":"04/11/2023","cd":"2023-11-19","lat":12.321431,"lon":123.661507,"sm":981,"fm":981,"tm":981,"am":981,"md":0.0,"ls":"inside","ww":"Bañadero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":328.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5919},{"i":7601,"cid":"21KJ0081","pid":"P00522176MN","t":"Construction of Ozamiz City Drainage Package 2, Ozamiz City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":null,"deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":46550000.28,"abc":49000000.0,"fy":"2021","sd":"10/08/2021","cd":"2022-07-25","lat":8.142178,"lon":123.844249,"sm":null,"fm":null,"tm":null,"am":1047,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":154},{"i":7602,"cid":"23HH0117","pid":"P00732028VS","t":"Construction of Flood Mitigation Structure, Barangay Tejero, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"NEW GLOBALDEV CORPORATION","c":4932965.79,"abc":4950000.0,"fy":"2023","sd":"08/23/2023","cd":"2023-12-24","lat":10.302877,"lon":123.907587,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tejero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5920},{"i":7603,"cid":"21HG0142","pid":"P00550018VS","t":"Construction of Mompeller River Flood Control, Brgy. Mompeller, Argao, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"Argao","deo":"Cebu 2nd District Engineering Office","co":"O.Q. CONSTRUCTION AND SUPPLY","c":26345090.31,"abc":29700000.0,"fy":"2021","sd":"10/20/2021","cd":"2022-09-23","lat":9.985656,"lon":123.528212,"sm":72,"fm":null,"tm":72,"am":72,"md":0.0,"ls":"inside","ww":"Mompeller","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mompeller","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5921},{"i":7604,"cid":"23FL0018","pid":"P00737578LZ","t":"Construction of Flood Mitigation Structure/Shoreline Protection, Barangay Calintaan - Barangay Calayuan, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":9800997.16,"abc":54450000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-29","lat":12.533757,"lon":124.092785,"sm":955,"fm":955,"tm":955,"am":955,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calintaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5922},{"i":7605,"cid":"23HI0001","pid":"P00721829VS","t":"Construction of Flood Control Structure along Cotcot River, Compostela, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"COMPOSTELA (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":48949066.04,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-10","lat":10.449932,"lon":123.97012,"sm":446,"fm":446,"tm":446,"am":446,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5923},{"i":7606,"cid":"23HO0038","pid":"P00731618VS","t":"Construction of Flood Wall Structures along Sitio Dao, Barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":95531364.4,"abc":95533076.14,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":9.998748,"lon":123.411385,"sm":887,"fm":887,"tm":887,"am":1214,"md":33.03,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[7599,7613,7623,7631,7632],"run":[6606,6671],"cl":[],"L":"records","s":88,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.03,"text":"The pin is 33.0 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23HO0038 to 23HO0040) cover the same site, together worth PHP 202,426,489.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":5},{"i":7607,"cid":"22HH0078","pid":"P00630658VS","t":"Construction of Drainage System at Barangay San Roque, Cebu City, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"CEBU HAYDTER CONSTRUCTION","c":4900186.98,"abc":4950000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-07-18","lat":10.294993,"lon":123.907762,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5924},{"i":7608,"cid":"22KJ0048","pid":"P00620043MN","t":"Construction of Slope Protection (Upstream & Downstream) of Tudela Bridge along Ozamis - Oroquieta Road, Sta. 0+115.00 - Sta. 0+150.00, Sta. 0+218.00 - Sta. 0+421.00, Tudela, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TUDELA (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":29355361.0,"abc":30900380.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-24","lat":8.243568,"lon":123.844286,"sm":1601,"fm":1601,"tm":1601,"am":1601,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":238.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5925},{"i":7609,"cid":"24HF0045","pid":"P00820343VS","t":"Construction of Flood Mitigation Structure along Sapangdaku River, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-11-15","lat":10.381954,"lon":123.661784,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5926},{"i":7610,"cid":"22FM0024","pid":"P00631465LZ","t":"Construction of Flood Mitigation Structure at Bito River, Sitio Tangigue, Brgy. Baybay Dagat, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":32584624.86,"abc":34300000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-11-27","lat":12.48731,"lon":123.76384,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Baybay Dagat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5927},{"i":7611,"cid":"23FI0032","pid":"P00726302LZ","t":"Construction of Flood Protection Measures along Sinalogan River, Brgy. Cayabon, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":49000000.0,"abc":48999976.66,"fy":"2023","sd":"02/02/2023","cd":"2023-06-26","lat":12.253594,"lon":123.529453,"sm":974,"fm":974,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":"Sinalogan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cayabon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5928},{"i":7612,"cid":"22FH0068","pid":"P00640585LZ","t":"Construction of San Andres Breakwater Phase 2, San Andres Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN ANDRES (CALOLBON) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":29398756.61,"abc":29399999.13,"fy":"2022","sd":"04/12/2022","cd":"2022-11-24","lat":13.598555,"lon":124.095482,"sm":1254,"fm":1254,"tm":null,"am":1254,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5929},{"i":7613,"cid":"23HO0067","pid":"P00721516VS","t":"Construction of Revetment Wall at Sitio Lower Talayong, Brgy. Tupas - Sitio Bagonbon, Brgy. Libo-o (Left Side Downstream), Ronda, Cebu","w":"Construction of Revetment","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FIRST GRANDEUR BUILDERS / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":96401741.64,"abc":96401741.73,"fy":"2023","sd":"02/08/2023","cd":"2023-12-19","lat":9.998748,"lon":123.411385,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupas","len":null,"ph":null,"dup":[7599,7606,7623,7631,7632],"run":[],"cl":[7006,7011,7055,7056,7064,7918,7927,7983,7992],"L":"records","s":76,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":31},{"i":7614,"cid":"22HD0015","pid":"P00620029VS","t":"Construction of Flood Control Structure at Barangay Caduawan, Sta. 0+000 - Sta. 1+163, Tabogon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TABOGON (CEBU)","deo":"Cebu 4th District Engineering Office","co":"PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION)","c":72375000.0,"abc":72375000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-11-21","lat":10.926864,"lon":123.970444,"sm":1503,"fm":1503,"tm":1503,"am":1503,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caduawan","len":1163.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5930},{"i":7615,"cid":"22FA0078","pid":"P00639396LZ","t":"Construction of Shore Protection at Alimsog Buhatan, Sto. Domingo, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / KENZAI BUILDERS CORPORATION","c":94570000.0,"abc":94569452.7,"fy":"2022","sd":"08/03/2022","cd":"2023-01-29","lat":13.225805,"lon":123.845508,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5931},{"i":7616,"cid":"22FB0147","pid":"P00640468LZ","t":"Construction of Flood Control Structure, Salugan Section, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"KENZAI BUILDERS CORPORATION / JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":97998183.09,"abc":97998363.27,"fy":"2022","sd":"04/13/2022","cd":"2023-01-30","lat":13.187819,"lon":123.662046,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5932},{"i":7617,"cid":"23HF0015","pid":"P00721768VS","t":"Construction of Weir Dam at Guinabasan River near Guinabasan Bridge, Barangay Sta. Lucia, Asturias, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ASTURIAS (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":77199933.95,"abc":77200000.0,"fy":"2023","sd":"03/02/2023","cd":"2023-11-28","lat":10.622697,"lon":123.764351,"sm":79,"fm":79,"tm":79,"am":79,"md":0.0,"ls":"inside","ww":"Guinabasan","wn":"Ginabasan River","wd":0.04,"wp":[10.62297,123.76461],"wst":"matched","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5933},{"i":7618,"cid":"22HH0121","pid":"P00633016VS","t":"Construction of Road, V. Ariola Street, from Barangay Tejero to Barangay Carreta, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"PLANAC CONSTRUCTION","c":4889970.0,"abc":4900000.0,"fy":"2022","sd":"09/13/2022","cd":"2022-12-22","lat":10.304542,"lon":123.908168,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tejero","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5934},{"i":7619,"cid":"23F00050","pid":"P00740460LZ","t":"Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION)","c":192998274.8,"abc":192998274.8,"fy":"2023","sd":"05/29/2023","cd":"2024-03-31","lat":13.22624,"lon":123.764889,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5935},{"i":7620,"cid":"22FB0192","pid":"P00639536LZ","t":"Construction of Flood Control Structure, Tinago Phase 2, Sta. 0 + 250 - Sta. 0 + 450, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48998250.84,"abc":48998376.35,"fy":"2022","sd":"04/11/2022","cd":"2022-11-23","lat":13.188451,"lon":123.662281,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":200.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5936},{"i":7621,"cid":"22HG0020","pid":"P00620127VS","t":"Construction of Dalaguete River Flood Control, Dalaguete, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DALAGUETE (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-10-14","lat":9.762978,"lon":123.529847,"sm":476,"fm":476,"tm":476,"am":476,"md":0.0,"ls":"inside","ww":"Dalaguete","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5937},{"i":7622,"cid":"22FH0013","pid":"P00631453LZ","t":"Construction of San Andres Breakwater, San Andres, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN ANDRES (CALOLBON) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":48998742.08,"abc":48998759.21,"fy":"2022","sd":"03/02/2022","cd":"2022-11-21","lat":13.596169,"lon":124.097319,"sm":1254,"fm":1254,"tm":1254,"am":1254,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5938},{"i":7623,"cid":"23HO0126","pid":"P00733272VS","t":"Construction of Groundsill along Saliring River (Upstream), Malabuyoc, Cebu","w":"Construction of Groundsill","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":57898214.56,"abc":57898226.98,"fy":"2023","sd":"04/11/2023","cd":"2023-12-07","lat":9.998748,"lon":123.411385,"sm":887,"fm":887,"tm":887,"am":1214,"md":33.03,"ls":"outside","ww":"Saliring","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7599,7606,7613,7631,7632],"run":[],"cl":[],"L":"records","s":78,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.03,"text":"The pin is 33.0 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":26},{"i":7624,"cid":"23HN0049","pid":"P00721774VS","t":"Construction of Flood Control Structure along Butuanon River (Phase VII), Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2023-12-12","lat":10.34395,"lon":123.970878,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.09,"wp":[10.34318,123.97104],"wst":"matched","br":null,"len":null,"ph":"Phase VII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5939},{"i":7625,"cid":"24KJ0006","pid":"P00820156MN","t":"Construction of Juarez Sebac CIS Protection Dike, Tudela, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TUDELA (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"ABIB BUILDERS ENTERPRISE","c":11882500.74,"abc":12250000.0,"fy":"2024","sd":"03/01/2024","cd":"2024-10-20","lat":8.249938,"lon":123.845663,"sm":1601,"fm":1601,"tm":1601,"am":1601,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5940},{"i":7626,"cid":"21HE0158","pid":"P00549967VS","t":"Construction of Valladolid River Flood Control Structure, Carcar City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"City of Carcar","deo":"Cebu 1st District Engineering Office","co":"WERR CORPORATION INTERNATIONAL / PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION)","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"11/03/2021","cd":"2022-08-31","lat":10.107433,"lon":123.66295,"sm":379,"fm":null,"tm":379,"am":379,"md":0.0,"ls":"inside","ww":"Valladolid","wn":"Valladolid River","wd":0.01,"wp":[10.10745,123.663],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5941},{"i":7627,"cid":"23HH0069","pid":"P00721685VS","t":"Construction of Flood Mitigation Structure along Tejero Creek, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"FLUSSKREBS CONSTRUCTORS","c":43978839.53,"abc":44100000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-09-21","lat":10.301994,"lon":123.908336,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Tejero","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5942},{"i":7628,"cid":"22FM0023","pid":"P00631463LZ","t":"Construction of Flood Mitigation Structure at Bito River, Sitio Lagang, Brgy. Binitinan, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":34299948.51,"abc":34300000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-09-05","lat":12.4897,"lon":123.76547,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":"Bito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Binitinan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5943},{"i":7629,"cid":"22FO0027","pid":"P00631356LZ","t":"Construction of Flood Control/River Dike, Barangay Pandan, Ligao City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":39100891.04,"abc":39200000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-02-25","lat":13.22785,"lon":123.53073,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pandan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5944},{"i":7630,"cid":"22HC0052","pid":"P00630212VS","t":"Construction of Flood Control Structure, Brgy. Poblacion to Brgy. San Ramon, Sagbayan, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"SAGBAYAN (BORJA) (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":47530000.0,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-08-01","lat":9.919396,"lon":124.101112,"sm":1234,"fm":1234,"tm":1234,"am":1234,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5945},{"i":7631,"cid":"23HO0186","pid":"P00733262VS","t":"Construction of Storm Surge Protection Structures at Sitio North Suba, Barangay Looc, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493356.5,"abc":96493378.77,"fy":"2023","sd":"05/05/2023","cd":"2024-01-11","lat":9.998748,"lon":123.411385,"sm":887,"fm":887,"tm":887,"am":1214,"md":33.03,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":null,"ph":null,"dup":[7599,7606,7613,7623,7632],"run":[],"cl":[],"L":"records","s":86,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.03,"text":"The pin is 33.0 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":8},{"i":7632,"cid":"23HO0190","pid":"P00733277VS","t":"Construction of Storm Surge Protection Structures at Sitio Lala-o, Barangay Montañeza, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96493351.85,"abc":96493910.79,"fy":"2023","sd":"05/05/2023","cd":"2023-09-26","lat":9.998748,"lon":123.411385,"sm":887,"fm":887,"tm":887,"am":1214,"md":33.03,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montañeza","len":null,"ph":null,"dup":[7599,7606,7613,7623,7631],"run":[],"cl":[],"L":"records","s":86,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":33.03,"text":"The pin is 33.0 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":5,"text":"This exact pin is shared with 5 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.65,"value":5,"text":"5 other contract(s) with different titles use this exact pin, 5 of them funded in the same year. Combined value at this pin: PHP 538,540,621.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":9},{"i":7633,"cid":"21K00271","pid":"P00522302MN","t":"Construction of Flood Control Structure along Palilan River (Pl-6, Left Bank), Jimenez, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"Jimenez","deo":"Misamis Occidental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":35108440.26,"abc":45355000.0,"fy":"2021","sd":"07/23/2021","cd":"2023-04-24","lat":8.333526,"lon":123.846349,"sm":669,"fm":null,"tm":669,"am":669,"md":0.0,"ls":"inside","ww":"Palilan","wn":"Palilan River","wd":0.03,"wp":[8.33354,123.84663],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5946},{"i":7634,"cid":"23FB0153","pid":"P00742197LZ","t":"Construction of Flood Mitigation Structure, Brgy. Salugan, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":98928190.55,"abc":98928597.11,"fy":"2023","sd":"07/03/2023","cd":"2024-02-13","lat":13.194608,"lon":123.662952,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5947},{"i":7635,"cid":"23HH0110","pid":"P00732029VS","t":"Construction of Flood Mitigation Structure, Barangay Pulangbato, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"ST. BERNARDINE CONSTRUCTION & ENTERPRISES (FOR. ST","c":4933978.32,"abc":4950000.0,"fy":"2023","sd":"08/23/2023","cd":"2024-01-21","lat":10.398008,"lon":123.90873,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pulangbato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5948},{"i":7636,"cid":"23FJ0015","pid":"P00726305LZ","t":"Construction of Flood Control Concrete Revetment at Dapdap River, Upstream Right Side, Barangay Dapdap, Sta. 0+000.00 - Sta. 0+247.00, Uson, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"RED DIAMOND CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: RED DIAMOND CONSTRUCTION)","c":38730805.32,"abc":39068761.93,"fy":"2023","sd":"04/18/2023","cd":"2023-12-22","lat":12.214791,"lon":123.767784,"sm":1618,"fm":1618,"tm":1618,"am":1618,"md":0.0,"ls":"inside","ww":"Dapdap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dapdap","len":247.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5949},{"i":7637,"cid":"24JE0022","pid":"P00820393MN","t":"Construction of Flood Control Structure, Mapangi River Basin, Tambulig, Zamboanga Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"TAMBULIG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":29374937.82,"abc":29400000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-05","lat":8.025852,"lon":123.532298,"sm":1536,"fm":1536,"tm":1536,"am":1536,"md":0.0,"ls":"inside","ww":"Mapangi","wn":"Magpangi River","wd":7.06,"wp":[8.03921,123.59495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.63,"value":7.06,"text":"The title names Mapangi, which OpenStreetMap maps through the stated municipality, but the pin is 7.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":361},{"i":7638,"cid":"22FL0026","pid":"P00632975LZ","t":"Construction of River Control Structure, Barangay Ariman, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"RMH CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":18940659.69,"abc":49500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-09-03","lat":12.908583,"lon":124.101797,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ariman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5950},{"i":7639,"cid":"24HO0122","pid":"P00834660VS","t":"Construction of Revetment Wall along Talaba River Flood Control, Barangay Canduling, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"FIRST GRANDEUR BUILDERS","c":39196415.8,"abc":39196417.46,"fy":"2024","sd":"04/01/2024","cd":"2024-09-05","lat":10.002745,"lon":123.412294,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Canduling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5951},{"i":7640,"cid":"22HO0056","pid":"P00620456VS","t":"Construction of Slope Protection Structure along Basak Section, Badian, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"BADIAN (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48996091.75,"abc":48996091.75,"fy":"2022","sd":"03/23/2022","cd":"2023-01-29","lat":9.839764,"lon":123.412892,"sm":101,"fm":101,"tm":101,"am":101,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5952},{"i":7641,"cid":"22HE0066","pid":"P00633225VS","t":"Construction of Seawall, Brgy. Poblacion, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":49500000.0,"abc":49500000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-12-21","lat":10.240259,"lon":123.846591,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5953},{"i":7642,"cid":"22HH0087","pid":"P00630653VS","t":"Construction of Drainage System at Barangay Luz, Cebu City","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"1ST J.E. ADLAWAN CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: ELEAZAR V. ADLAWAN CONSTRUCTION)","c":4935395.43,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-25","lat":10.323869,"lon":123.908744,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Luz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5954},{"i":7643,"cid":"24FB0060","pid":"P00844568LZ","t":"Construction of Flood Control System along Barangay Sumlang to Barangay Gapo, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":96498671.05,"abc":96498905.59,"fy":"2024","sd":"04/08/2024","cd":"2024-11-15","lat":13.182308,"lon":123.664199,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sumlang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5955},{"i":7644,"cid":"23F00162","pid":"P00736133LZ","t":"Construction of Flood Mitigation Structure along Brgy. Silangan Poblacion, District 2, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48249895.17,"abc":48249895.17,"fy":"2023","sd":"03/24/2023","cd":"2023-12-22","lat":12.478793,"lon":123.768139,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silangan Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5956},{"i":7645,"cid":"22HB0091","pid":"P00630218VS","t":"Construction of Drainage System, Brgy. Poblacion, Bilar, Bohol","w":"Construction of Drainage Structure","rg":"Region VII","pv":"BOHOL","mu":"BILAR (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / AQUATERRA KONSTRUKT INC.","c":32337988.76,"abc":32340000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-12-15","lat":9.703687,"lon":124.101888,"sm":202,"fm":202,"tm":202,"am":202,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5957},{"i":7646,"cid":"22FL0041","pid":"P00630967LZ","t":"Construction of Flood Control Structure along Carriedo Bridge (Upstream), Phase II, Carriedo, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-03-29","lat":12.934689,"lon":124.103333,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5958},{"i":7647,"cid":"22FL0040","pid":"P00630966LZ","t":"Construction of Flood Control Structure along Carriedo Bridge (Upstream), Phase I, Carriedo, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-01-29","lat":12.934822,"lon":124.103353,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5959},{"i":7648,"cid":"23HG0040","pid":"P00733739VS","t":"Construction of Drainage System, Brgy. Poblacion Dalaguete, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"DALAGUETE (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"BT CONSTRUCTION AND GENERAL SERVICES","c":4938888.88,"abc":4950000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-05-07","lat":9.755561,"lon":123.533175,"sm":476,"fm":476,"tm":362,"am":476,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Dalaguete","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":66.09,"text":"The record contradicts itself: the municipality field and the pin point to Dalaguete, Cebu, but the title names Cebu City, Cebu, 66 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":630},{"i":7649,"cid":"25HN0043","pid":"P00920070VS","t":"Construction of Flood Control Structure along Butuanon River (Downstream) Outfall, Barangay Pakna-an, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":72325000.0,"abc":72375000.0,"fy":"2025","sd":"02/21/2025","cd":"2025-04-28","lat":10.343448,"lon":123.971079,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.03,"wp":[10.34318,123.97108],"wst":"matched","br":"Pakna-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5960},{"i":7650,"cid":"22HC0048","pid":"P00630215VS","t":"Construction of Flood Control Structure, Baogo, Inabanga, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"INABANGA (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":47292350.0,"abc":49000000.0,"fy":"2022","sd":"01/31/2022","cd":"2023-10-31","lat":10.032375,"lon":124.104196,"sm":639,"fm":639,"tm":639,"am":639,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5961},{"i":7651,"cid":"23HO0048","pid":"P00721977VS","t":"Construction of Revetment Wall along Barangay Talaba River Flood Control (Upstream), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS / FIRST GRANDEUR BUILDERS","c":86848237.27,"abc":86848251.07,"fy":"2023","sd":"03/16/2023","cd":"2023-11-20","lat":10.003255,"lon":123.413761,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Barangay Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talaba River Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5962},{"i":7652,"cid":"24KG0011","pid":"P00820153MN","t":"Construction of Limuag CIS Protection Dike, Baroy, Lanao Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"BAROY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"PRIME HAUS BUILDERS & ENTERPRISES","c":12250000.0,"abc":12250000.0,"fy":"2024","sd":"01/23/2024","cd":"2024-07-24","lat":7.96452,"lon":123.8485,"sm":170,"fm":170,"tm":170,"am":170,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5963},{"i":7653,"cid":"22FB0190","pid":"P00639544LZ","t":"Construction of River Bank Protection Works and Drainage System along Comun-Binitayan-Inarado River, Camalig, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY / FIRST OMB CONSTRUCTION AND DEVELOPMENT CORP.","c":48999516.44,"abc":48999919.64,"fy":"2022","sd":"04/11/2022","cd":"2022-09-30","lat":13.126167,"lon":123.664334,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Comun-Binitayan-Inarado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5964},{"i":7654,"cid":"23F00063","pid":"P00740461LZ","t":"Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION)","c":192998182.0,"abc":192998182.0,"fy":"2023","sd":"05/04/2023","cd":"2023-12-31","lat":13.224533,"lon":123.768454,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5965},{"i":7655,"cid":"23HA0068","pid":"P00721938VS","t":"Sta. Filomena Shore Protection - Sta. Filomena, Alburquerque, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"ALBURQUERQUE (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"HERBERT MALMIS GENERAL MERCHANDISING & CONTRACTOR","c":17490000.0,"abc":17640000.0,"fy":"2023","sd":"05/11/2023","cd":"2024-01-07","lat":9.6058,"lon":123.972,"sm":23,"fm":23,"tm":23,"am":23,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5966},{"i":7656,"cid":"22HH0089","pid":"P00630660VS","t":"Construction of Drainage System at Barangay Tinago, Cebu City","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"1ST J.E. ADLAWAN CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: ELEAZAR V. ADLAWAN CONSTRUCTION)","c":4935105.1,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-25","lat":10.29715,"lon":123.908817,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5967},{"i":7657,"cid":"24FK0047","pid":"P00846128LZ","t":"Construction of Seawall, Brgy. Buenavista, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":19799980.32,"abc":79199947.93,"fy":"2024","sd":"05/17/2024","cd":"2024-12-11","lat":13.037134,"lon":124.105924,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5968},{"i":7658,"cid":"22FO0034","pid":"P00630977LZ","t":"Construction of Groundsill Dam along Tobgon River (Downstream) of Tobgon Bridge, Ligao City, Albay","w":"Construction of Groundsill","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-12-01","lat":13.248965,"lon":123.53345,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Tobgon","wn":"Tobgon River","wd":0.02,"wp":[13.24913,123.53334],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5969},{"i":7659,"cid":"24HO0083","pid":"P00834662VS","t":"Construction of Revetment Wall at Barangay Bala - Barangay Lanao (Upstream Right Side), Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"SUDAN CONSTRUCTION AND SUPPLY CORP.","c":29394904.7,"abc":29395323.91,"fy":"2024","sd":"02/26/2024","cd":"2024-04-15","lat":10.007425,"lon":123.414573,"sm":980,"fm":980,"tm":980,"am":1214,"md":3.66,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bala","len":null,"ph":null,"dup":[7667,7675],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.69,"value":3.66,"text":"The pin is 3.7 km outside Moalboal, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 136,285,181.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":80},{"i":7660,"cid":"22FK0076","pid":"P00640477LZ","t":"Construction of Revetment Wall, Milagrosa River, Castilla, Sorsogon","w":"Construction of Revetment","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":98999981.03,"abc":98999981.21,"fy":"2022","sd":"06/21/2022","cd":"2023-06-22","lat":12.97955,"lon":123.84889,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Milagrosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5970},{"i":7661,"cid":"23HF0003","pid":"P00721674VS","t":"Construction of Drainage Outfall at Toledo-Tabuelan-San Remigio Road, K0103 + 052 - K0103 + 405, Barangay Putat, Tuburan, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JIAN ARMEL RICHARD CHRISTERSON (JARC) CONSTRUCTION & MARINE SERVICES CORPORATION (FORMERLY:J.A.R.C.","c":10779791.4,"abc":10780000.0,"fy":"2023","sd":"05/25/2023","cd":"2023-10-09","lat":10.786994,"lon":123.849586,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5971},{"i":7662,"cid":"23HH0131","pid":"P00733746VS","t":"Construction of Flood Mitigation Structure, Brgy. Luz, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"PLANAC CONSTRUCTION","c":4940000.0,"abc":4950000.0,"fy":"2023","sd":"11/09/2023","cd":"2024-05-13","lat":10.319645,"lon":123.909062,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Luz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5972},{"i":7663,"cid":"23FA0022","pid":"P00740475LZ","t":"Construction of River Dike at Bagong San Roque, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96499955.68,"fy":"2023","sd":"04/17/2023","cd":"2023-09-20","lat":13.253796,"lon":123.768837,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5973},{"i":7664,"cid":"23HD0051","pid":"P00721535VS","t":"Construction of Flood Control Structure at Cebu North Hagnaya Wharf Rd, Barangay Don Pedro Rodriguez, City of Bogo, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":89745000.0,"abc":89745000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-12-07","lat":11.06219,"lon":123.97255,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Don Pedro Rodriguez","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5974},{"i":7665,"cid":"22HG0044","pid":"P00620130VS","t":"Construction of Slope Protection Structure along Natalio Bacalso Avenue, Dalaguete, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"DALAGUETE (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/09/2022","cd":"2022-10-21","lat":9.783689,"lon":123.534122,"sm":476,"fm":476,"tm":476,"am":476,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5975},{"i":7666,"cid":"23FK0006","pid":"P00737581LZ","t":"Construction of Seawall, Sitio Dancalan, Barangay Buenavista, Bacon District, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":7919978.36,"abc":71669931.81,"fy":"2023","sd":"02/23/2023","cd":"2023-11-22","lat":13.040806,"lon":124.106456,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5976},{"i":7667,"cid":"24HO0108","pid":"P00834594VS","t":"Construction of Revetment Wall at Sitio Kanduong - Sitio Lawaan, Barangay Bala, Moalboal, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MOALBOAL (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":57894463.74,"abc":57895284.24,"fy":"2024","sd":"03/12/2024","cd":"2024-09-24","lat":10.007425,"lon":123.414573,"sm":980,"fm":980,"tm":980,"am":1214,"md":3.66,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bala","len":null,"ph":null,"dup":[7659,7675],"run":[],"cl":[],"L":"records","s":73,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.69,"value":3.66,"text":"The pin is 3.7 km outside Moalboal, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 136,285,181.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":40},{"i":7668,"cid":"23FK0089","pid":"P00742492LZ","t":"Construction of Sea Wall, Brgy. Bucalbucalan, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":9546698.83,"abc":54449963.17,"fy":"2023","sd":"07/18/2023","cd":"2024-03-05","lat":12.977629,"lon":123.909369,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bucalbucalan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5977},{"i":7669,"cid":"23HF0002","pid":"P00721673VS","t":"Construction of Shoreline Protection at Barangay Talavera along Toledo-Tabuelan-Sn Remigio Rd, Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48938244.75,"abc":49000000.0,"fy":"2023","sd":"10/19/2023","cd":"2024-05-24","lat":10.412107,"lon":123.665412,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talavera along Toledo-Tabuelan-Sn Remigio Rd","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5978},{"i":7670,"cid":"22HF0058","pid":"P00620121VS","t":"Construction of Drainage System at Brgy. Putat, K0102+755 - K0103+052, Tuburan, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"TUBURAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JUGA BUILDERS & CONSTRUCTION SUPPLY","c":7603479.13,"abc":7603820.0,"fy":"2022","sd":"09/08/2022","cd":"2023-04-14","lat":10.78716,"lon":123.84996,"sm":1598,"fm":1598,"tm":1598,"am":1598,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Putat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5979},{"i":7671,"cid":"23FA0047","pid":"P00740455LZ","t":"Rehabilitation of Flood Control at Maangot River, Purok 2, Barangay San Isidro, Sto. Domingo, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":72375000.0,"abc":72374999.99,"fy":"2023","sd":"06/01/2023","cd":"2023-11-22","lat":13.230973,"lon":123.769664,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"Maangot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5980},{"i":7672,"cid":"23FK0015","pid":"P00725894LZ","t":"Construction of Revetment at Bon-Ot, Bacon, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":48247328.32,"abc":48249921.98,"fy":"2023","sd":"02/23/2023","cd":"2023-11-28","lat":13.057494,"lon":124.106536,"sm":422,"fm":422,"tm":422,"am":422,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5981},{"i":7673,"cid":"22KF0015","pid":"P00620144MN","t":"Construction of Slope Protection along Barongison Bridge, (Downstream), Maigo, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-15","lat":8.169444,"lon":123.973056,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5982},{"i":7674,"cid":"24FI0030","pid":"P00820442LZ","t":"Construction of Flood Control Structure, Asid River, Masbate City, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CITY OF MASBATE (CAPITAL) (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"C.L. CARANDANG ENTERPRISES / A3 CONSTRUCTION & SUPPLY","c":96499956.99,"abc":96499956.77,"fy":"2024","sd":"02/21/2024","cd":"2024-09-26","lat":12.268611,"lon":123.538889,"sm":404,"fm":404,"tm":404,"am":974,"md":0.05,"ls":"boundary","ww":"Asid","wn":"Asid River","wd":0.03,"wp":[12.26855,123.53916],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5983},{"i":7675,"cid":"24HO0111","pid":"P00834663VS","t":"Construction of Revetment Wall at Barangay Madridejos, Alegria, Cebu (Upstream Left Side)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ALEGRIA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48995812.34,"abc":48996112.34,"fy":"2024","sd":"03/12/2024","cd":"2024-05-21","lat":10.007425,"lon":123.414573,"sm":29,"fm":29,"tm":29,"am":1214,"md":23.52,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madridejos","len":null,"ph":null,"dup":[7659,7667],"run":[],"cl":[],"L":"records","s":73,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.52,"text":"The pin is 23.5 km outside Alegria, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":2,"text":"This exact pin is shared with 2 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 136,285,181.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":41},{"i":7676,"cid":"24HD0033","pid":"P00820188VS","t":"Construction of Flood Control Structure at Maraat Bridge, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN REMIGIO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY)","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-05","lat":10.93264,"lon":123.91033,"sm":1355,"fm":1355,"tm":1355,"am":1355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5984},{"i":7677,"cid":"22HE0067","pid":"P00633224VS","t":"Construction of Seawall, Brgy. Cansojong, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":9900000.0,"abc":9900000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-08-30","lat":10.245573,"lon":123.851713,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cansojong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5985},{"i":7678,"cid":"22HF0035","pid":"P00630192VS","t":"Construction of Slope Protection Structure along Carcar-Barili Road, Sta. 56+000-Sta.57+000, Barili, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"BARILI (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":96277080.22,"abc":96500000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-12-28","lat":10.121938,"lon":123.53891,"sm":164,"fm":164,"tm":164,"am":164,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5986},{"i":7679,"cid":"22FL0021","pid":"P00631476LZ","t":"Construction of River Revetment and Protection in Sitio Marukbarok, Barangay San Ignacio, Gubat, Sorsogon","w":"Construction of Revetment","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":28517999.41,"abc":58800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-09-04","lat":12.944925,"lon":124.113892,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Ignacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5987},{"i":7680,"cid":"22H00025","pid":"P00620043VS","t":"Construction of Tayud Causeway, Barangay Tayud, Sta. 0+000 - Sta. 0 + 850, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS / VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":115799830.6,"abc":115800000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-04-20","lat":10.36683,"lon":123.97515,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tayud","len":850.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5988},{"i":7681,"cid":"24HA0062","pid":"P00834640VS","t":"Construction of Abucayan Norte Flood Control, Abucayan Norte, Calape, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CALAPE (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":19532000.0,"abc":19600000.0,"fy":"2024","sd":"04/12/2024","cd":"2024-09-10","lat":9.9167,"lon":123.9104,"sm":296,"fm":296,"tm":296,"am":296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5989},{"i":7682,"cid":"23FO0062","pid":"P00742201LZ","t":"Rehabilitation of Left and Right Side of Talisay River Flood Mitigation Structure, Brgy. Zone 4, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":74249999.5,"abc":146555000.0,"fy":"2023","sd":"05/15/2023","cd":"2023-11-30","lat":13.288194,"lon":123.416927,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.02,"wp":[13.28806,123.41676],"wst":"matched","br":"Zone 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5990},{"i":7683,"cid":"24HF0005","pid":"P00820397VS","t":"Construction of Flood Mitigation Structure at Sapangdaku River (Tributary Area), Barangay Juan Climaco Sr., Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48857807.52,"abc":49000000.0,"fy":"2024","sd":"02/02/2024","cd":"2024-10-17","lat":10.354251,"lon":123.665812,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Juan Climaco Sr","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5991},{"i":7684,"cid":"23HA0127","pid":"P00721904VS","t":"Construction of Drainage Structure, Jct. Tagbilaran North Road K0002+170 and Peñaflor Street leading to Outfall, Brgys. Cogon, Booy and Taloto, Tagbilaran City, Bohol (Phase 1)","w":"Construction of Drainage Structure","rg":"Region VII","pv":"BOHOL","mu":"TAGBILARAN CITY (CAPITAL) (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":72150000.0,"abc":72231631.04,"fy":"2023","sd":"11/10/2023","cd":"2024-06-23","lat":9.66488,"lon":123.85552,"sm":1513,"fm":1513,"tm":1513,"am":1513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5992},{"i":7685,"cid":"24F00264","pid":"P00825137LZ","t":"Construction of Basud River Flood Mitigation structure (Package 1), Barangay Lidong, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION)","c":173699690.0,"abc":173699800.5,"fy":"2024","sd":"05/03/2024","cd":"2024-12-31","lat":13.22194,"lon":123.769995,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"Basud","wn":"Basud River","wd":0.05,"wp":[13.2224,123.77016],"wst":"matched","br":"Lidong","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5993},{"i":7686,"cid":"22FL0006","pid":"P00620752LZ","t":"Construction of Flood Control Structure at Sitio Lawigan, Brgy. San Rafael, Sta. Magdalena, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"SANTA MAGDALENA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":47415662.39,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-08-01","lat":12.655233,"lon":124.114531,"sm":1389,"fm":1389,"tm":1389,"am":1389,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Rafael","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5994},{"i":7687,"cid":"22FI0012","pid":"P00620739LZ","t":"Rehabilitation/Improvement of Asid River Control, Masbate City and Milagros, Masbate","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"MASBATE","mu":"CITY OF MASBATE (CAPITAL) (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY","c":20334927.38,"abc":20334927.38,"fy":"2022","sd":"02/07/2022","cd":"2022-08-09","lat":12.268063,"lon":123.538928,"sm":404,"fm":404,"tm":404,"am":974,"md":0.03,"ls":"boundary","ww":"Asid","wn":"Asid River","wd":0.02,"wp":[12.26807,123.53912],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5995},{"i":7688,"cid":"23FB0006","pid":"P00737380LZ","t":"Construction of River Bank Protection Works and Drainage System along Comun-Binitayan-Inarado River, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"INFRA BUILDERS AND SELLERS, PHILIPPINES","c":57728167.3,"abc":57728398.82,"fy":"2023","sd":"02/27/2023","cd":"2023-09-02","lat":13.128525,"lon":123.66664,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":"Comun-Binitayan-Inarado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5996},{"i":7689,"cid":"24H00078","pid":"P00834574VS","t":"Construction of Flood Control Structure along Luyang River, Package 1, Carmen, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CARMEN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":67549987.0,"abc":67550000.0,"fy":"2024","sd":"06/13/2024","cd":"2024-12-31","lat":10.606005,"lon":123.977002,"sm":338,"fm":338,"tm":338,"am":338,"md":0.0,"ls":"inside","ww":"Luyang","wn":"Luyang River","wd":0.01,"wp":[10.60609,123.97702],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5997},{"i":7690,"cid":"23FL0018","pid":"P00737576LZ","t":"Construction of Flood Mitigation Structure/Shoreline Protection, Barangay Otavi, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":9603008.42,"abc":54450000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-29","lat":12.638871,"lon":123.911684,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Otavi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5998},{"i":7691,"cid":"22JD0063","pid":"P00634127MN","t":"Construction of Shore Protection in Sunset Boulevard, Dapitan City","w":"Construction of Slope Protection Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"DAPITAN CITY (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 1st District Engineering Office","co":"WESTMIN ENTERPRISES & CONSTRUCTION SERVICES","c":14847933.19,"abc":14850000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-02-01","lat":8.65088,"lon":123.41737,"sm":484,"fm":484,"tm":484,"am":484,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":5999},{"i":7692,"cid":"23KJ0009","pid":"P00721614MN","t":"Rehabilitation of Slope Protection along Ozamiz - Oroquieta Road, Downstream of Clarin Bridge, Clarin, Misamis Occidental","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"CLARIN (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47530000.0,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-12-11","lat":8.203891,"lon":123.855943,"sm":440,"fm":440,"tm":440,"am":440,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6000},{"i":7693,"cid":"22F00003","pid":"P00620311LZ","t":"Construction/Improvement of Bagong San Roque Flood Control, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":138413784.2,"abc":138413784.2,"fy":"2022","sd":"03/28/2022","cd":"2022-12-15","lat":13.254016,"lon":123.770364,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7695],"run":[],"cl":[],"L":"records","s":64,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 227,703,853.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":69},{"i":7694,"cid":"22FL0007","pid":"P00620754LZ","t":"Construction of Flood Control Structure, Brgy. Ariman, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":49000000.0,"abc":98000000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-10-14","lat":12.909381,"lon":124.114653,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ariman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6001},{"i":7695,"cid":"22F00143","pid":"P00620317LZ","t":"Construction/Improvement of Kilbay River Flood Mitigation Structure, Del Gallego, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"DEL GALLEGO (CAMARINES SUR)","deo":"Camarines Sur 1st District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":89290069.17,"abc":89290069.17,"fy":"2022","sd":"06/20/2022","cd":"2023-06-15","lat":13.254016,"lon":123.770364,"sm":502,"fm":502,"tm":502,"am":1411,"md":129.54,"ls":"outside","ww":"Kilbay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[7693],"run":[],"cl":[],"L":"records","s":80,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":129.54,"text":"The pin is 129.5 km outside Del Gallego, Camarines Sur, the nearest municipality the record claims. It falls in Santo Domingo, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 227,703,853.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":19},{"i":7696,"cid":"23JE0073","pid":"P00721601MN","t":"Construction of Flood Control Brgy. Calolot, Tambulig, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"TAMBULIG (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":9779316.2,"abc":9800000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-03-12","lat":8.069,"lon":123.539,"sm":1536,"fm":1536,"tm":1536,"am":1536,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calolot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6002},{"i":7697,"cid":"23HH0051","pid":"P00721833VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Barangay Pulangbato, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"GOWIL BUILDERS","c":9784118.0,"abc":9800000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-07-20","lat":10.396945,"lon":123.9163,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.39688,123.91638],"wst":"matched","br":"Pulangbato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6003},{"i":7698,"cid":"22FK0035","pid":"P00639393LZ","t":"Construction of River Control Structure at Brgy. Osiao, Bacon District, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":55874133.4,"abc":57899973.2,"fy":"2022","sd":"04/06/2022","cd":"2022-10-18","lat":13.09388,"lon":123.97758,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Osiao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6004},{"i":7699,"cid":"23HF0030","pid":"P00721824VS","t":"Construction of Flood Mitigation Structure at Sapangdaku River (Tributary Area), Barangay Juan Climaco Sr., Toledo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TOLEDO CITY (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY","c":48994486.8,"abc":49000000.0,"fy":"2023","sd":"06/01/2023","cd":"2024-03-01","lat":10.351586,"lon":123.667176,"sm":1577,"fm":1577,"tm":1577,"am":1577,"md":0.0,"ls":"inside","ww":"Sapangdaku","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Juan Climaco Sr","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6005},{"i":7700,"cid":"23HH0083","pid":"P00721784VS","t":"Construction of Flood Mitigation Structure along Kinalumsan River, Barangay Buhisan, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BNR CONSTRUCTION & DEVELOPMENT CORP.","c":96396340.74,"abc":96500000.0,"fy":"2023","sd":"05/23/2023","cd":"2024-03-05","lat":10.30691,"lon":123.856007,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Kinalumsan","wn":"Kinalumsan River","wd":0.0,"wp":[10.3069,123.856],"wst":"matched","br":"Buhisan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6006},{"i":7701,"cid":"24HO0112","pid":"P00834667VS","t":"Construction of Revetment Wall, Phase 2, Purok Balanghoy, Barangay Ylaya, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"RDY BUILDERS CONSTRUCTION AND GENERAL MERCHANDISE / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":48996321.52,"abc":48996358.28,"fy":"2024","sd":"03/18/2024","cd":"2024-05-20","lat":10.004547,"lon":123.418214,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ylaya","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[7002,7746,7799,7822,7872,7913,7949],"L":"field","s":18,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1106},{"i":7702,"cid":"22FK0041","pid":"P00620756LZ","t":"Balogo Bacon Seawall, Bacon District, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":12421484.87,"abc":36451065.52,"fy":"2022","sd":"03/11/2022","cd":"2022-11-26","lat":13.067215,"lon":124.117131,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6007},{"i":7703,"cid":"23K00105","pid":"P00721422MN","t":"Construction of Flood Control Structure along Maranding River, Package 1, Lala, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LALA (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":108491280.9,"abc":110800000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-07-04","lat":7.916541,"lon":123.770553,"sm":741,"fm":741,"tm":741,"am":699,"md":0.02,"ls":"boundary","ww":"Maranding","wn":"Maranding River","wd":0.02,"wp":[7.91634,123.7706],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6008},{"i":7704,"cid":"23HC0077","pid":"P00721940VS","t":"Construction of Flood Mitigation Structures and Drainage System, Lapacan Sur, Dait Drainage Buenavista, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"BUENAVISTA (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":39100000.0,"abc":39200000.0,"fy":"2023","sd":"05/04/2023","cd":"2024-11-26","lat":10.044189,"lon":124.11721,"sm":239,"fm":239,"tm":null,"am":239,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6009},{"i":7705,"cid":"22FO0039","pid":"P00620691LZ","t":"Construction of Binatagan Flood Control Structure along Matanglad River(Right Side) Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"NGS CONSTRUCTION SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/04/2022","cd":"2022-10-15","lat":13.2537,"lon":123.542,"sm":396,"fm":396,"tm":null,"am":396,"md":0.0,"ls":"inside","ww":"Matanglad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6010},{"i":7706,"cid":"24HA0056","pid":"P00820178VS","t":"Construction of Matabao CIS Flood Protection Dike, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"NENIAL CONSTRUCTION","c":4890000.0,"abc":4900000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-07-18","lat":9.9316,"lon":123.917,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6011},{"i":7707,"cid":"23F00029","pid":"P00726626LZ","t":"Construction of Quinale A River Flood Mitigation Structure (Polangui and Libon Section), Polangui and Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":125336435.0,"abc":125336435.3,"fy":"2023","sd":"04/20/2023","cd":"2023-12-19","lat":13.32549,"lon":123.418484,"sm":1157,"fm":1157,"tm":null,"am":782,"md":0.04,"ls":"boundary","ww":"Quinale A","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6012},{"i":7708,"cid":"21FB0074","pid":"P00526196LZ","t":"Construction/Improvement of River Bank and Abutment Protection along Caridad Bridge, Banquerohan, Legazpi City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"Legazpi City","deo":"Albay 2nd District Engineering Office","co":"ANKOR GAULLE CONSTRUCTION AND SUPPLY CORPORATION","c":29398110.84,"abc":29398367.15,"fy":"2021","sd":"03/02/2022","cd":"2022-07-12","lat":13.040056,"lon":123.770667,"sm":768,"fm":null,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6013},{"i":7709,"cid":"22HC0109","pid":"P00630188VS","t":"Construction of Flood Control Structure, Bugaong, Buenavista, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"BUENAVISTA (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"CEBU 7H TECHNOCHEM INDUSTRIES, INC. / PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION)","c":66585000.0,"abc":66585000.0,"fy":"2022","sd":"08/11/2022","cd":"2023-10-30","lat":10.05097,"lon":124.121528,"sm":239,"fm":239,"tm":239,"am":239,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6014},{"i":7710,"cid":"23FK0023","pid":"P00742483LZ","t":"Construction of Seawall at Brgy. Osiao, Bacon District, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALPHA RYDER CONSTRUCTION & SUPPLIES","c":51124338.4,"abc":52469973.68,"fy":"2023","sd":"03/27/2023","cd":"2023-11-08","lat":13.093036,"lon":123.978631,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Osiao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6015},{"i":7711,"cid":"22FG0039","pid":"P00631419LZ","t":"Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Balaton, Lagonoy, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-11-21","lat":13.931913,"lon":123.542918,"sm":736,"fm":736,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6016},{"i":7712,"cid":"24FO0014","pid":"P00821003LZ","t":"Construction of San Agustin CIS Slope Protection Works at Auxiliary Dam, Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":9800000.0,"abc":9800000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-07-02","lat":13.3255,"lon":123.41858,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6017},{"i":7713,"cid":"22FK0036","pid":"P00630987LZ","t":"Construction of Milagrosa River Control, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":67548745.83,"abc":67549984.7,"fy":"2022","sd":"04/06/2022","cd":"2023-02-13","lat":12.972726,"lon":123.857024,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Milagrosa","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6018},{"i":7714,"cid":"23FJ0014","pid":"P00726307LZ","t":"Construction of Divisoria Flood Control, Sta. 0+110.00 - Sta. 0+290.00, Upstream Right Side, Cawayan, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CAWAYAN (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"JOHNCB CONSTRUCTION & SUPPLIES","c":23506539.35,"abc":23509608.55,"fy":"2023","sd":"02/13/2023","cd":"2023-08-29","lat":11.927529,"lon":123.771178,"sm":361,"fm":361,"tm":361,"am":361,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":180.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6019},{"i":7715,"cid":"24KJ0108","pid":"P00835873MN","t":"Construction of Drainage Structure, Scot, Tangub City, Misamis Occidental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"WEISENWORK CONSTRUCTION","c":4752999.28,"abc":4900000.0,"fy":"2024","sd":"06/21/2024","cd":"2024-09-24","lat":8.102927,"lon":123.668967,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6020},{"i":7716,"cid":"24HD0031","pid":"P00820186VS","t":"Construction of Flood Control Structure at Barangay La Paz, City of Bogo, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY)","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-05","lat":10.99902,"lon":123.98118,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6021},{"i":7717,"cid":"22FL0059","pid":"P00640587LZ","t":"Construction of Alegria River Control, Alegria, Barcelona, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BARCELONA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":15523200.0,"abc":15840000.0,"fy":"2022","sd":"06/21/2022","cd":"2022-11-16","lat":12.860447,"lon":124.127122,"sm":163,"fm":163,"tm":163,"am":163,"md":0.0,"ls":"inside","ww":"Alegria","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6022},{"i":7718,"cid":"22F00020","pid":"P00620296LZ","t":"Construction of Quinale \"A\" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"POLANGUI (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES","c":192707498.1,"abc":192707498.1,"fy":"2022","sd":"03/21/2022","cd":"2023-01-24","lat":13.325807,"lon":123.418961,"sm":1157,"fm":1157,"tm":1157,"am":1157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6023},{"i":7719,"cid":"22FJ0027","pid":"P00631471LZ","t":"Construction of Seawall Protection Structure, Barangay Banahao, Poblacion, Canomay and Suba, Dimasalang, Masbate","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":48985300.98,"abc":48999921.4,"fy":"2022","sd":"02/16/2022","cd":"2023-01-04","lat":12.194375,"lon":123.857556,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banahao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6024},{"i":7720,"cid":"21KG0030","pid":"P00522342MN","t":"Construction of Revetment/ Riverbank Protection along Maranding River Stream, Barangay Maranding Annex, Kapatagan, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"Kapatagan","deo":"Lanao del Norte 2nd District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":32884498.68,"abc":34687500.0,"fy":"2021","sd":"04/13/2022","cd":"2022-12-16","lat":7.916904,"lon":123.771512,"sm":699,"fm":null,"tm":699,"am":741,"md":0.02,"ls":"boundary","ww":"Maranding","wn":"Maranding River","wd":0.03,"wp":[7.91695,123.77123],"wst":"matched","br":"Maranding Annex","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6025},{"i":7721,"cid":"22FK0055","pid":"P00639549LZ","t":"Construction of Sea Wall along Brgy. Dao, Pilar, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"PILAR (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":19599587.99,"abc":58799990.39,"fy":"2022","sd":"04/04/2022","cd":"2023-06-01","lat":12.919865,"lon":123.671273,"sm":1131,"fm":1131,"tm":1131,"am":1131,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6026},{"i":7722,"cid":"22HH0007","pid":"P00620132VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Brgy. Bacayan, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"SBD BUILDERS","c":26592415.28,"abc":27504680.0,"fy":"2022","sd":"02/22/2022","cd":"2023-05-19","lat":10.389174,"lon":123.919102,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.38922,123.9191],"wst":"matched","br":"Bacayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6027},{"i":7723,"cid":"22F00109","pid":"P00620306LZ","t":"Construction/ Rehabilitation of Nasisi River Flood Mitigation Structure (Brgy. Mahaba), Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"G.C.I.  CONSTRUCTION AND DEV'T. CORP.","c":106149935.7,"abc":106149935.7,"fy":"2022","sd":"07/25/2022","cd":"2023-07-13","lat":13.252397,"lon":123.54464,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Nasisi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mahaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6028},{"i":7724,"cid":"22FL0053","pid":"P00640590LZ","t":"Construction of Sea Wall at Brgy. Coron-Coron, Matnog, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MATNOG (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MAGDA CONSTRUCTION AND SUPPLY INC.","c":18245676.54,"abc":19800000.0,"fy":"2022","sd":"06/24/2022","cd":"2023-08-02","lat":12.554767,"lon":123.982081,"sm":955,"fm":955,"tm":955,"am":955,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Coron-Coron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6029},{"i":7725,"cid":"22K00294","pid":"P00634128MN","t":"Construction of Flood Control along Pagayawan Road, Barangay Banago, Balabagan, Lanao de Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"BALABAGAN (LANAO DEL SUR)","deo":"Lanao del Sur 2nd District Engineering Office","co":"TESAR BUILDERS","c":6860609.84,"abc":6930000.0,"fy":"2022","sd":"06/29/2022","cd":"2022-10-26","lat":7.513273,"lon":124.127135,"sm":116,"fm":116,"tm":116,"am":116,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6030},{"i":7726,"cid":"22JE0012","pid":"P00630566MN","t":"Construction of Balangasan - Mindig River Control, Pagadian City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PAGADIAN CITY (CAPITAL) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"L.C. CONSTRUCTION CORPORATION (FOR: L.C. CONSTRUCTION)","c":15639498.93,"abc":19600000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-12-16","lat":7.82578,"lon":123.4197,"sm":1054,"fm":1054,"tm":1054,"am":1054,"md":0.0,"ls":"inside","ww":"Mindig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6031},{"i":7727,"cid":"22FK0062","pid":"P00640592LZ","t":"Construction of Bagong Sirang Seawall , Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":24749997.68,"abc":49499987.41,"fy":"2022","sd":"04/04/2022","cd":"2023-05-05","lat":12.916821,"lon":123.857736,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6032},{"i":7728,"cid":"23FA0039","pid":"P00740655LZ","t":"Construction of Flood Mitigation Structure, Zone 2 of Brgy. Labnig, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":48020000.0,"abc":95059998.36,"fy":"2023","sd":"05/09/2023","cd":"2023-10-27","lat":13.378709,"lon":123.674982,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labnig","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6033},{"i":7729,"cid":"24FG0017","pid":"P00820472LZ","t":"Construction of Flood Mitigation Structure along Rangas River, Mampirao, San Jose, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"SAN JOSE (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"ALRO CONSTRUCTION & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/28/2024","cd":"2025-02-10","lat":13.67698,"lon":123.5454,"sm":1300,"fm":1300,"tm":1300,"am":1300,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.11,"wp":[13.67727,123.54637],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6034},{"i":7730,"cid":"23HA0018","pid":"P00721663VS","t":"Construction of Flood Mitigation Structure and Drainage System of Cantomimbo Flood Control, Balilihan, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"BALILIHAN (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"HUSAIN CONSTRUCTION AND SUPPLY CO.","c":4885000.0,"abc":4900000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-04-25","lat":9.76667,"lon":123.98694,"sm":132,"fm":132,"tm":132,"am":132,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6035},{"i":7731,"cid":"23K00208","pid":"P00721664MN","t":"Construction of Gata River Flood Control, Phase III, Poona Bayabao, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"POONA BAYABAO (GATA) (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.","c":28658991.24,"abc":28950000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-08-31","lat":7.5077,"lon":124.128,"sm":1162,"fm":1162,"tm":1162,"am":116,"md":41.09,"ls":"outside","ww":"Gata","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":41.09,"text":"The pin is 41.1 km outside Poona Bayabao, Lanao del Sur, the nearest municipality the record claims. It falls in Balabagan, Lanao del Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":220},{"i":7732,"cid":"22HO0007","pid":"P00620045VS","t":"Construction of Ylaya River Control, Ylaya, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"DT&C CONSTRUCTION","c":29398308.21,"abc":29398308.21,"fy":"2022","sd":"02/10/2022","cd":"2022-08-18","lat":10.030583,"lon":123.420103,"sm":1214,"fm":1214,"tm":1214,"am":539,"md":0.32,"ls":"boundary","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6036},{"i":7733,"cid":"24KI0029","pid":"P00821222MN","t":"Construction of Flood Control along Daisug River,Lopez Jaena, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"LOPEZ JAENA (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"MINDANAO ROCK","c":37239990.16,"abc":37240000.0,"fy":"2024","sd":"03/11/2024","cd":"2025-03-21","lat":8.55007,"lon":123.77207,"sm":810,"fm":810,"tm":810,"am":810,"md":0.0,"ls":"inside","ww":"Daisug","wn":"Daisug River","wd":0.03,"wp":[8.54976,123.77204],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6037},{"i":7734,"cid":"22FK0059","pid":"P00620286LZ","t":"Construction of Flood Control Structure, Caditaan River, Magallanes, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MAGALLANES (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":57892326.39,"abc":57899981.64,"fy":"2022","sd":"03/21/2022","cd":"2023-03-10","lat":12.79188,"lon":123.8599,"sm":862,"fm":862,"tm":862,"am":862,"md":0.0,"ls":"inside","ww":"Caditaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6038},{"i":7735,"cid":"22FK0055","pid":"P00639548LZ","t":"Construction of Sea Wall along Brgy. Banuyo, Pilar, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"PILAR (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":39199962.76,"abc":58799990.39,"fy":"2022","sd":"04/04/2022","cd":"2023-06-01","lat":12.926713,"lon":123.676398,"sm":1131,"fm":1131,"tm":1131,"am":1131,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Banuyo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6039},{"i":7736,"cid":"24HH0009","pid":"P00820334VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Barangay Pit-os, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"FLUSSKREBS CONSTRUCTORS / BNR CONSTRUCTION & DEVELOPMENT CORP.","c":144594682.6,"abc":144750000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-28","lat":10.390874,"lon":123.920301,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.0,"wp":[10.39087,123.92034],"wst":"matched","br":"Pit-os","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6040},{"i":7737,"cid":"22FO0090","pid":"P00631354LZ","t":"Construction of Flood Control Project, Barangay San Ramon, Oas, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"ELKANKONSTRAK DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"07/11/2022","cd":"2023-01-06","lat":13.28985,"lon":123.54948,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Ramon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6041},{"i":7738,"cid":"23GQ0055","pid":"P00733700VS","t":"Construction of Flood Control Structures at Brgy. 6, San Carlos City, Negros Occidental (Sta. 0+725 - Sta. 1+035)","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"KENNETH CONSTRUCTION AND GENERAL MERCHANDISE","c":19800000.0,"abc":19799844.0,"fy":"2023","sd":"04/27/2023","cd":"2023-10-29","lat":10.48165,"lon":123.42117,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"6","len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6042},{"i":7739,"cid":"23HD0032","pid":"P00721534VS","t":"Construction of Flood Control Structure at Taytayan Bridge, Sta. 000 + 000 - Sta. 001 + 071, City of Bogo, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-27","lat":11.05202,"lon":123.98695,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1071.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6043},{"i":7740,"cid":"23KF0122","pid":"P00721495MN","t":"Construction of Protection work/Revetment along Maranding River Downstream, Sta.0+000 - Sta.0+215, Barangay Maranding, Lala, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LALA (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":48448879.15,"abc":48995500.0,"fy":"2023","sd":"08/10/2023","cd":"2024-02-22","lat":7.919509,"lon":123.77214,"sm":741,"fm":741,"tm":741,"am":699,"md":0.03,"ls":"boundary","ww":"Maranding","wn":"Maranding River","wd":0.02,"wp":[7.91929,123.77217],"wst":"matched","br":"Maranding","len":215.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6044},{"i":7741,"cid":"23KJ0030","pid":"P00721257MN","t":"Rehabilitation of Slope Protection along Ozamiz - Oroquieta Road Upstream of Labo Bridge H-Ramiro, Lapasan, Clarin, Misamis Occidental","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"CLARIN (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47529999.47,"abc":49000000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-11","lat":8.190642,"lon":123.859996,"sm":440,"fm":440,"tm":440,"am":440,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6045},{"i":7742,"cid":"23FB0092","pid":"P00727212LZ","t":"Construction of Flood Control System along Lacag-Inarado River, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"VERZONTAL INFRASTRUCTURE CORPORATION (FORMERLY: VERZONTAL BUILDERS, INC.)","c":48809805.94,"abc":48809911.73,"fy":"2023","sd":"03/21/2023","cd":"2023-09-17","lat":13.137181,"lon":123.676833,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Lacag-Inarado","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6046},{"i":7743,"cid":"22HA0042","pid":"P00620308VS","t":"Construction of Flood Mitigation Structure at Barangay Tupas (Antequera) along Abatan River - Sta. 000+000.00 - Sta. 001+000.00, Antequera, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"ANTEQUERA (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R / HERBERT MALMIS GENERAL MERCHANDISING & CONTRACTOR","c":47914729.53,"abc":49000000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-11-15","lat":9.74297,"lon":123.92036,"sm":65,"fm":65,"tm":65,"am":65,"md":0.0,"ls":"inside","ww":"Abatan","wn":"Abatan River","wd":0.02,"wp":[9.74291,123.9205],"wst":"matched","br":"Tupas","len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6047},{"i":7744,"cid":"24FG0065","pid":"P00824784LZ","t":"Construction of Flood Control Structure (Rangas River) along Jct. Nato-Sabang Coastal Road, Barangay Telegrafo, San Jose, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Camarines Sur 4th District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":51940000.0,"abc":51940000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-12-12","lat":13.675741,"lon":123.55273,"sm":1300,"fm":1031,"tm":1300,"am":1300,"md":0.0,"ls":"inside","ww":"Rangas","wn":"Rangas River","wd":0.07,"wp":[13.67624,123.55236],"wst":"matched","br":"Telegrafo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":35.66,"text":"The record contradicts itself: the title and the pin point to San Jose, Camarines Sur, but the municipality field names Oas, Albay, 36 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":523},{"i":7745,"cid":"21FH0065","pid":"P00561199LZ","t":"Construction of Seawall, Municipality of Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Caramoran","deo":"Catanduanes District Engineering Office","co":"JASMIN CONSTRUCTION","c":29397518.79,"abc":29398758.79,"fy":"2021","sd":"09/06/2022","cd":"2022-12-31","lat":13.983345,"lon":124.130656,"sm":332,"fm":null,"tm":332,"am":332,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6048},{"i":7746,"cid":"24HO0071","pid":"P00834586VS","t":"Construction of Revetment Wall along Ylaya River (Purok Manga Section), Package 3, Barangay Ylaya, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":57896463.4,"abc":57896963.4,"fy":"2024","sd":"02/16/2024","cd":"2024-06-13","lat":10.006378,"lon":123.421459,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ylaya","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[7002,7701,7799,7822,7872,7913,7949],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1090},{"i":7747,"cid":"23HH0111","pid":"P00732024VS","t":"Construction of Flood Mitigation Structure, Barangay Cogon, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BELCONSTRUCT CORPORATION","c":9884041.44,"abc":9900000.0,"fy":"2023","sd":"08/17/2023","cd":"2024-02-07","lat":10.270936,"lon":123.860017,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cogon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6049},{"i":7748,"cid":"23HH0056","pid":"P00721837VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Barangay Pit-os, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"FLUSSKREBS CONSTRUCTORS","c":43999790.93,"abc":44100000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-19","lat":10.391501,"lon":123.920536,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.0,"wp":[10.39149,123.92057],"wst":"matched","br":"Pit-os","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6050},{"i":7749,"cid":"21HF0049","pid":"P00550016VS","t":"Construction of Flood Mitigation Structure at Balud River along Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) K0046+400 - K0046+928, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"Cebu City","deo":"Cebu 3rd District Engineering Office","co":"O.Q. CONSTRUCTION AND SUPPLY","c":14849542.74,"abc":14850000.0,"fy":"2021","sd":"01/11/2022","cd":"2022-09-09","lat":10.338299,"lon":123.676945,"sm":362,"fm":null,"tm":362,"am":1577,"md":10.57,"ls":"outside","ww":"Balud","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.84,"value":10.57,"text":"The pin is 10.6 km outside Cebu City, Cebu, the nearest municipality the record claims. It falls in Toledo City, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":304},{"i":7750,"cid":"22FK0017","pid":"P00630962LZ","t":"Construction of Flood Control Protection Against Flooding along Macabog River, Sorsogon City, Sorsogon","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":67547282.86,"abc":67549981.59,"fy":"2022","sd":"02/17/2022","cd":"2022-12-27","lat":12.98419,"lon":123.987204,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Macabog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6051},{"i":7751,"cid":"22FG0062","pid":"P00639546LZ","t":"Construction of Flood Control Structure (sea wall) along Lamit Bay, Sipaco, Lagonoy, Camarines Sur-","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"05/25/2022","cd":"2023-06-12","lat":13.884047,"lon":123.55301,"sm":736,"fm":736,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6052},{"i":7752,"cid":"21FH0101","pid":"P00561433LZ","t":"Construction of Seawall, Barangay Poblacion, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Caramoran","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":9898760.0,"abc":9898760.0,"fy":"2021","sd":"01/18/2022","cd":"2022-07-01","lat":13.98502,"lon":124.130672,"sm":332,"fm":null,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6053},{"i":7753,"cid":"23HO0075","pid":"P00721893VS","t":"Construction of Road Dike at Purok Manga, Ronda, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":96497499.84,"abc":96497669.07,"fy":"2023","sd":"03/16/2023","cd":"2023-07-10","lat":10.001164,"lon":123.421534,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6054},{"i":7754,"cid":"22K00090","pid":"P00620212MN","t":"Construction of Flood Control Structure along Maranding River, Brgy. Maranding, Package 1, Lala, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LALA (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"KOUZBARY BUILDERS / LANAO BUILDER AND ENTERPRISES","c":99375933.66,"abc":102983835.0,"fy":"2022","sd":"03/21/2022","cd":"2023-01-14","lat":7.919155,"lon":123.772506,"sm":741,"fm":741,"tm":741,"am":741,"md":0.0,"ls":"inside","ww":"Maranding","wn":"Maranding River","wd":0.02,"wp":[7.9193,123.77251],"wst":"matched","br":"Maranding","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6055},{"i":7755,"cid":"21FA0038","pid":"P00561195LZ","t":"Flood mitigation and rehabilitation of river control structures at the Malolos River in Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":null,"deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":19800000.0,"abc":29699985.6,"fy":"2021","sd":"04/19/2022","cd":"2022-09-15","lat":13.38225,"lon":123.67808,"sm":null,"fm":null,"tm":null,"am":897,"md":null,"ls":"unknown","ww":"Malolos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":155},{"i":7756,"cid":"24HD0105","pid":"P00834643VS","t":"Construction of Flood Control and Drainage System along Taytayan Creek, Taytayan, City of Bogo, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"QM BUILDERS / ADAMANT DEVELOPMENT CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"07/24/2024","cd":"2025-02-09","lat":11.05505,"lon":123.98724,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":"Taytayan","wn":"Taytayan Creek","wd":0.0,"wp":[11.05505,123.98721],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6056},{"i":7757,"cid":"24HH0008","pid":"P00820332VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Barangay Bacayan-San Jose, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"A.S.T BUILDERS / BNR CONSTRUCTION & DEVELOPMENT CORP.","c":144598801.2,"abc":144750000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-11-19","lat":10.379931,"lon":123.920588,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.0,"wp":[10.37994,123.92059],"wst":"matched","br":"Bacayan-San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6057},{"i":7758,"cid":"22HM0054","pid":"P00630228VS","t":"Construction of Slope Protection Structure along Brgy. San Antonio, Siquijor - Brgy. Campalanas, Lazi Road, Siquijor","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"SIQUIJOR","mu":"SIQUIJOR (CAPITAL) (SIQUIJOR)","deo":"Siquijor District Engineering Office","co":"HELM CONSTRUCTION & SUPPLIES / W.GO CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-09-09","lat":9.14522,"lon":123.553453,"sm":1465,"fm":1465,"tm":1465,"am":1465,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6058},{"i":7759,"cid":"22FH0021","pid":"P00631454LZ","t":"Construction of Seawall at Barangay Toytoy, Poblacion Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NIDA BUILDER'S & SUPPLIES","c":9798760.0,"abc":9798760.0,"fy":"2022","sd":"03/02/2022","cd":"2022-07-16","lat":13.986329,"lon":124.130683,"sm":332,"fm":332,"tm":null,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Toytoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6059},{"i":7760,"cid":"24FJ0026","pid":"P00821016LZ","t":"Construction of Dimasalang Flood Control, Barangay G. Aliño, Dimasalang, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"3R3M CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: 3R3M CONSTRUCTION AND SUPPLY)","c":48942303.93,"abc":48956486.55,"fy":"2024","sd":"02/15/2024","cd":"2024-09-11","lat":12.18896,"lon":123.860912,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"G. Aliño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6060},{"i":7761,"cid":"22FN0020","pid":"P00620329LZ","t":"Rehabilitation of Revetment Wall Upstream at Waras River, Sta. 8+385 - Sta. 8+665 (BS), San Andres, Sta. Teresita, Iriga City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":77199986.09,"abc":77200000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-10-14","lat":13.487582,"lon":123.422298,"sm":648,"fm":648,"tm":648,"am":648,"md":0.0,"ls":"inside","ww":"Waras","wn":"Waras","wd":0.0,"wp":[13.48757,123.4223],"wst":"matched","br":null,"len":280.0,"ph":null,"dup":[7773],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 154,399,743.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":818},{"i":7762,"cid":"22KF0023","pid":"P00620148MN","t":"Construction of Slope Protection along Muntay Bridge, Sta. 0+000.00 - Sta. 0+300.00, Kolambugan, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"KOLAMBUGAN (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-10","lat":8.127781,"lon":123.92114,"sm":715,"fm":715,"tm":715,"am":715,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6061},{"i":7763,"cid":"23HD0062","pid":"P00733737VS","t":"Construction of Drainage System, Brgy. La Paz, Bogo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"Z & G CONSTRUCTION SERVICES","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-06-10","lat":11.00734,"lon":123.98813,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"La Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6062},{"i":7764,"cid":"24HN0191","pid":"P00834575VS","t":"Construction of Flood Control Structure along Orel Creek, Barangay Banilad, Mandaue City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":67450000.0,"abc":67550000.0,"fy":"2024","sd":"09/11/2024","cd":"2025-03-20","lat":10.33861,"lon":123.921262,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Orel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Banilad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6063},{"i":7765,"cid":"24FA0020","pid":"P00823644LZ","t":"Construction of Flood Mitigation Structure, Barangay Tanawan, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"OMEGA CONTRACTING AND DEVELOPMENT CORP. / STEVEN CONSTRUCTION & SUPPLY","c":48250000.0,"abc":48249999.1,"fy":"2024","sd":"04/16/2024","cd":"2024-08-28","lat":13.404444,"lon":123.678333,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tanawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6064},{"i":7766,"cid":"23FI0015","pid":"P00726301LZ","t":"Construction of Flood Protection Measures along Sinalogan River, Brgy. Asid, Masbate City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CITY OF MASBATE (CAPITAL) (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"RED DIAMOND CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: RED DIAMOND CONSTRUCTION)","c":49000000.0,"abc":48999950.6,"fy":"2023","sd":"02/01/2023","cd":"2023-05-16","lat":12.270136,"lon":123.558342,"sm":404,"fm":404,"tm":404,"am":404,"md":0.0,"ls":"inside","ww":"Sinalogan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Asid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6065},{"i":7767,"cid":"22FA0027","pid":"P00631340LZ","t":"Rehabilitation of Sugod River Wall, Bacacay, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":24500000.0,"abc":24499987.87,"fy":"2022","sd":"03/11/2022","cd":"2022-07-25","lat":13.304546,"lon":123.773236,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Sugod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6066},{"i":7768,"cid":"23HH0057","pid":"P00721834VS","t":"Construction of Flood Mitigation Structure along Butuanon River, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"BNR CONSTRUCTION & DEVELOPMENT CORP.","c":43973120.48,"abc":44100000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-10-22","lat":10.368652,"lon":123.922878,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.36869,123.92281],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6067},{"i":7769,"cid":"22MH0026","pid":"P00620096MN","t":"Construction of River Bank Protection/Flood Control at Hinalaan River, Kalamansig, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"KALAMANSIG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":91675000.0,"abc":91675000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-02-22","lat":6.532042,"lon":124.135817,"sm":688,"fm":688,"tm":688,"am":688,"md":0.0,"ls":"inside","ww":"Hinalaan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6068},{"i":7770,"cid":"21FK0036","pid":"P00526250LZ","t":"Construction of River Flood Control Structure, Gimaloto, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"City of Sorsogon","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":43509157.93,"abc":45079959.5,"fy":"2021","sd":"01/12/2022","cd":"2022-09-02","lat":12.985142,"lon":123.861567,"sm":422,"fm":null,"tm":422,"am":348,"md":1.53,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6069},{"i":7771,"cid":"24HD0103","pid":"P00821055VS","t":"Construction of Flood Control and Drainage System along Malingin River, Bogo City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF BOGO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"ADAMANT DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"07/10/2024","cd":"2024-12-21","lat":11.01851,"lon":123.98852,"sm":373,"fm":373,"tm":373,"am":373,"md":0.0,"ls":"inside","ww":"Malingin","wn":"Malingin River","wd":0.05,"wp":[11.01859,123.9881],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6070},{"i":7772,"cid":"23F00098","pid":"P00725885LZ","t":"River Bank Improvement with Drainage System along Salvacion River, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":48222482.56,"abc":48222505.2,"fy":"2023","sd":"03/15/2023","cd":"2023-11-11","lat":13.174496,"lon":123.678568,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Salvacion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6071},{"i":7773,"cid":"22FN0028","pid":"P00620330LZ","t":"Rehabilitation of Revetment Wall Upstream at Waras River, Sta. 9+044 - Sta. 9+304 (RS), Sta. 8+980.80 - Sta. 9+280.80 (LS), San Andres, Sta. Teresita, Iriga City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":77199756.92,"abc":77200000.0,"fy":"2022","sd":"03/21/2022","cd":"2022-09-22","lat":13.487582,"lon":123.422298,"sm":648,"fm":648,"tm":648,"am":648,"md":0.0,"ls":"inside","ww":"Waras","wn":"Waras","wd":0.0,"wp":[13.48757,123.4223],"wst":"matched","br":null,"len":560.0,"ph":null,"dup":[7761],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 154,399,743.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":819},{"i":7774,"cid":"23F00170","pid":"P00726986LZ","t":"Construction/Improvement/Rehabilitation of Nasisi River Flood Mitigation Structure (Barangay Batang, Barangay Herrera, and Barangay Pinit), Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":115799772.2,"abc":115799772.2,"fy":"2023","sd":"10/05/2023","cd":"2024-03-20","lat":13.260205,"lon":123.567603,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Nasisi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6072},{"i":7775,"cid":"21FA0042","pid":"P00526173LZ","t":"Construction/Extension of the Flood Mitigation/River Control at the Panarayon River (Downstream, Right side) in Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":null,"deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":12740000.0,"abc":24619763.98,"fy":"2021","sd":"04/26/2022","cd":"2022-09-17","lat":13.304722,"lon":123.773333,"sm":null,"fm":null,"tm":null,"am":88,"md":null,"ls":"unknown","ww":"Panarayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":156},{"i":7776,"cid":"24HN0122","pid":"P00834652VS","t":"Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"EMMARC CONSTRUCTION","c":4884986.38,"abc":4900000.0,"fy":"2024","sd":"04/19/2024","cd":"2024-10-11","lat":10.3348,"lon":123.923471,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tipolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6073},{"i":7777,"cid":"24FL0010","pid":"P00839680LZ","t":"Construction of River Control Structure, Dancalan, Bulusan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULUSAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"GDBS BUILDERS AND ENTERPRISE","c":4851786.65,"abc":9900000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-04-25","lat":12.766,"lon":124.1366,"sm":253,"fm":253,"tm":253,"am":253,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6074},{"i":7778,"cid":"22GK0085","pid":"P00630632VS","t":"Construction of Drainage System, Barangay Old Sagay, Sagay City, Negros Occidental","w":"Construction of Drainage Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAGAY CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 1st District Engineering Office","co":"KENBE CONSTRUCTION & SUPPLY","c":9898000.0,"abc":9899992.73,"fy":"2022","sd":"02/08/2022","cd":"2023-02-28","lat":10.93771,"lon":123.42235,"sm":1233,"fm":1233,"tm":1233,"am":1233,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Old Sagay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6075},{"i":7779,"cid":"22FA0058","pid":"P00631326LZ","t":"Construction of Flood Control Structure, Sogod Lubad Bridge Section (near Panarayon-Sogod Bridge), Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":9800000.0,"abc":34299996.45,"fy":"2022","sd":"05/30/2022","cd":"2022-09-30","lat":13.306379,"lon":123.773811,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6076},{"i":7780,"cid":"23FI0008","pid":"P00726298LZ","t":"Construction of Flood Control System along Lumbang River, Sta. 4+185.00 - Sta. 4+360.00 (Upstream, Both Sides), Masbate City, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"CITY OF MASBATE (CAPITAL) (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / A3 CONSTRUCTION & SUPPLY","c":49000000.0,"abc":48999977.5,"fy":"2023","sd":"04/11/2023","cd":"2023-06-15","lat":12.327621,"lon":123.570205,"sm":404,"fm":404,"tm":404,"am":404,"md":0.0,"ls":"inside","ww":"Lumbang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":175.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6077},{"i":7781,"cid":"23HN0104","pid":"P00733281VS","t":"Construction of Slope Protection System along Panoypoy Road (Phase III), Barangay Panoypoy, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":67499225.33,"abc":67550000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-02-02","lat":10.427413,"lon":123.923501,"sm":453,"fm":453,"tm":453,"am":362,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panoypoy","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6078},{"i":7782,"cid":"23FB0090","pid":"P00726970LZ","t":"Construction/Upgrading/Rehabilitation of Flood Mitigation System at Barangay Salvacion to Barangay Malabog River, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":72342833.02,"abc":72343147.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-31","lat":13.172473,"lon":123.681886,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Barangay Malabog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6079},{"i":7783,"cid":"24HA0060","pid":"P00832641VS","t":"Construction of Drainage System, Tagbilaran City, Bohol","w":"Construction of Drainage Structure","rg":"Region VII","pv":"BOHOL","mu":"TAGBILARAN CITY (CAPITAL) (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"3N CONSTRUCTION & SUPPLY","c":4620000.0,"abc":4950000.0,"fy":"2024","sd":"05/28/2024","cd":"2024-10-06","lat":9.63956,"lon":123.86377,"sm":1513,"fm":1513,"tm":1513,"am":1513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6080},{"i":7784,"cid":"23FL0010","pid":"P00726317LZ","t":"Construction of Flood Protection Measures, Brgy. Mabuhay, Bulusan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULUSAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":28518879.11,"abc":58800000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-11-15","lat":12.745564,"lon":124.137567,"sm":253,"fm":253,"tm":253,"am":253,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6081},{"i":7785,"cid":"23FA0023","pid":"P00740446LZ","t":"Construction of River Protection Structure at Telegrapo River (Downstream), Lidong, Santo Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96499999.52,"fy":"2023","sd":"04/24/2023","cd":"2023-12-22","lat":13.296686,"lon":123.863793,"sm":1411,"fm":1411,"tm":1411,"am":88,"md":6.5,"ls":"outside","ww":"Telegrapo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":52,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.5,"text":"The pin is 6.5 km outside Santo Domingo, Albay, the nearest municipality the record claims. It falls in Bacacay, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":178},{"i":7786,"cid":"22HI0034","pid":"P00620027VS","t":"Construction of Flood Control Structure along Cotcot River, Liloan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LILOAN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"BNR CONSTRUCTION & DEVELOPMENT CORP. / VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":86849993.95,"abc":86850000.0,"fy":"2022","sd":"03/07/2022","cd":"2022-12-31","lat":10.434657,"lon":123.988978,"sm":790,"fm":790,"tm":790,"am":446,"md":0.01,"ls":"boundary","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6082},{"i":7787,"cid":"24FK0020","pid":"P00820489LZ","t":"Construction of Malbog River Flood Mitigation Structure, Barangay Cumadcad, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":111729100.9,"abc":115799996.2,"fy":"2024","sd":"02/21/2024","cd":"2024-11-06","lat":12.951989,"lon":123.773866,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Malbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cumadcad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6083},{"i":7788,"cid":"23FL0006","pid":"P00727226LZ","t":"Construction of Flood Protection Measures along Cadac-an River, Brgy. Gabao - Brgy. Tongdol, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":38221649.44,"abc":68600000.0,"fy":"2023","sd":"05/15/2023","cd":"2023-11-22","lat":12.732483,"lon":123.989116,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.01,"wp":[12.7325,123.98923],"wst":"matched","br":"Gabao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6084},{"i":7789,"cid":"22FO0012","pid":"P00631003LZ","t":"Rehabilitation of San Agustin Flood Control Dike, San Agustin, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":77199936.61,"abc":77200000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-12-12","lat":13.32533,"lon":123.42238,"sm":782,"fm":782,"tm":782,"am":1157,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6085},{"i":7790,"cid":"22FG0041","pid":"P00631420LZ","t":"Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Manggogon, Lagonoy, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"LAGONOY (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/17/2022","cd":"2023-06-24","lat":13.917332,"lon":123.570581,"sm":736,"fm":736,"tm":736,"am":736,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6086},{"i":7791,"cid":"24FA0026","pid":"P00839659LZ","t":"Construction of River Wall, Barangay San Antonio, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3RB CONSTRUCTION & SUPPLY","c":6930000.0,"abc":6929999.21,"fy":"2024","sd":"06/18/2024","cd":"2024-07-26","lat":13.349626,"lon":123.683117,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6087},{"i":7792,"cid":"23HN0095","pid":"P00733288VS","t":"Construction of Slope Protection Structure along Panoypoy-Panas Road, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":72332540.0,"abc":72332540.0,"fy":"2023","sd":"05/18/2023","cd":"2023-11-17","lat":10.421293,"lon":123.926169,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6088},{"i":7793,"cid":"22FH0019","pid":"P00631455LZ","t":"Construction of Seawall, Palawig, San Andres, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN ANDRES (CALOLBON) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"EURO CONSTRUCTION AND SUPPLY ( FORMERLY: EURO CONSTRUCTION AND TRADING)","c":29398760.0,"abc":29398760.0,"fy":"2022","sd":"03/02/2022","cd":"2023-06-16","lat":13.572073,"lon":124.140353,"sm":1254,"fm":1254,"tm":1254,"am":1254,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6089},{"i":7794,"cid":"22FG0023","pid":"P00631426LZ","t":"Construction of Riverbank Protection along Manapot River, Tawog, Caramoan, Camarines Sur","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"CARAMOAN (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"IA FERRER CONSTRUCTION & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/10/2022","cd":"2022-11-19","lat":13.768269,"lon":123.863904,"sm":331,"fm":331,"tm":331,"am":331,"md":0.0,"ls":"inside","ww":"Manapot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6090},{"i":7795,"cid":"22FL0031","pid":"P00620285LZ","t":"Construction of Flood Mitigation Structure, Brgy. Bagacay, Gubat, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"GUBAT (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"RMH CONSTRUCTION & SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":65185352.97,"abc":67550000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-14","lat":12.986631,"lon":124.143317,"sm":596,"fm":596,"tm":596,"am":596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagacay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6091},{"i":7796,"cid":"23FA0034","pid":"P00740498LZ","t":"Construction/ Rehabilitation of Panarayon River Control, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":19300000.0,"abc":118739934.6,"fy":"2023","sd":"05/15/2023","cd":"2024-03-06","lat":13.30672,"lon":123.774422,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Panarayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6092},{"i":7797,"cid":"23FK0017","pid":"P00725898LZ","t":"Construction/ Rehabilitation of Flood Protection Measures at Brgy. Macabog, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":83375874.08,"abc":83375978.68,"fy":"2023","sd":"02/23/2023","cd":"2023-11-30","lat":12.983214,"lon":123.98985,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macabog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6093},{"i":7798,"cid":"22FO0060","pid":"P00630982LZ","t":"Construction of Nasisi River Flood Mitigation Structure (Brgy. Batang and Brgy. Herrera), Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":57828535.32,"abc":97100000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-07-15","lat":13.25613,"lon":123.57641,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Nasisi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6094},{"i":7799,"cid":"23HO0092","pid":"P00721895VS","t":"Construction of River Retaining Wall Structures along Ylaya River (Purok Saging - Purok Balangoy) Brgy. Ylaya, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":96497116.43,"abc":96498043.02,"fy":"2023","sd":"03/16/2023","cd":"2023-07-10","lat":10.001848,"lon":123.42247,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ylaya","len":null,"ph":null,"dup":[],"run":[],"cl":[7002,7701,7746,7822,7872,7913,7949],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1036},{"i":7800,"cid":"22HN0080","pid":"P00632990VS","t":"Construction of Slope Protection along Panoypoy Road, Brgy. Panoypoy, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-16","lat":10.424484,"lon":123.926989,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panoypoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6095},{"i":7801,"cid":"23FB0157","pid":"P00726983LZ","t":"Construction of Seawall for Storm Surge Protection at Purok 2, Mancao, Rapu-Rapu, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"RAPU-RAPU (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO","c":72367819.15,"abc":72368217.62,"fy":"2023","sd":"07/03/2023","cd":"2024-01-15","lat":13.360187,"lon":123.685415,"sm":1201,"fm":1201,"tm":1201,"am":897,"md":25.5,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7808],"run":[],"cl":[],"L":"records","s":76,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.97,"value":25.5,"text":"The pin is 25.5 km outside Rapu-Rapu, Albay, the nearest municipality the record claims. It falls in Malinao, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 99,317,819.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":32},{"i":7802,"cid":"23HH0143","pid":"P00721686VS","t":"Construction of Flood Mitigation Structure along Kinalumsan River, Barangay Punta Princesa, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"YES CONSTRUCTION","c":9720072.79,"abc":9800000.0,"fy":"2023","sd":"11/15/2023","cd":"2024-05-07","lat":10.298448,"lon":123.864476,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Kinalumsan","wn":"Kinalumsan River","wd":0.02,"wp":[10.29863,123.86437],"wst":"matched","br":"Punta Princesa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6096},{"i":7803,"cid":"22F00151","pid":"P00639390LZ","t":"Construction of Obi River Control Structures, Brgy. Obi, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":110974607.1,"abc":110974607.1,"fy":"2022","sd":"07/25/2022","cd":"2023-06-28","lat":13.766597,"lon":124.144119,"sm":332,"fm":332,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":"Obi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Obi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6097},{"i":7804,"cid":"21F00008","pid":"P00526344LZ","t":"Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Juban, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"Juban","deo":"Sorsogon 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":144750000.0,"abc":289499939.2,"fy":"2021","sd":"05/24/2021","cd":"2022-10-06","lat":12.78223,"lon":123.991457,"sm":680,"fm":null,"tm":680,"am":680,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.02,"wp":[12.78231,123.99165],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6098},{"i":7805,"cid":"23FO0060","pid":"P00740680LZ","t":"Construction of Tobgon Flood Mitigation Structure, Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48926316.82,"abc":48930000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-12-15","lat":13.256213,"lon":123.577708,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6099},{"i":7806,"cid":"23FL0068","pid":"P00725904LZ","t":"Rehabilitation/ Improvement of Flood Protection Measures along Gulang-Gulang River, Irosin, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":112322188.6,"abc":115800000.0,"fy":"2023","sd":"10/06/2023","cd":"2024-04-30","lat":12.737236,"lon":123.991616,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Gulang-Gulang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6100},{"i":7807,"cid":"22FA0017","pid":"P00631335LZ","t":"Rehabilitation of Comon River Wall, Tabaco City, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"CAJUGOTAN BUILDERS AND DEVELOPMENT CORP. (FOR: CAJUGOTAN CONSTRUCTION & SUPPLY)","c":24500000.0,"abc":24499999.99,"fy":"2022","sd":"02/24/2022","cd":"2022-07-15","lat":13.193813,"lon":123.42249,"sm":423,"fm":423,"tm":423,"am":1031,"md":23.36,"ls":"outside","ww":"Comon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.36,"text":"The pin is 23.4 km outside City of Tabaco, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":225},{"i":7808,"cid":"24FA0014","pid":"P00820992LZ","t":"Construction of Sagpan Kan Banwa CIP Slope Protection Works, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":26950000.0,"abc":26949999.62,"fy":"2024","sd":"03/18/2024","cd":"2024-08-12","lat":13.360187,"lon":123.685415,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[7801],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 99,317,819.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":238},{"i":7809,"cid":"23F00040","pid":"P00736062LZ","t":"Construction of Road Dike along Hitoma River, Phase I, Barangay Obi, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":192961477.8,"abc":192961477.8,"fy":"2023","sd":"03/27/2023","cd":"2024-03-31","lat":13.764765,"lon":124.145199,"sm":332,"fm":332,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":"Hitoma","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Obi","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6101},{"i":7810,"cid":"22HE0068","pid":"P00633226VS","t":"Construction of Seawall, Brgy. Tangke, Talisay City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CITY OF TALISAY (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":14850000.0,"abc":14850000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-09-30","lat":10.25318,"lon":123.866235,"sm":428,"fm":428,"tm":428,"am":428,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tangke","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6102},{"i":7811,"cid":"22FK0048","pid":"P00631481LZ","t":"Construction of Flood Control Project along Malbog River at Purok Rosal, Brgy. Cumadcad, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":9797426.1,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":12.952238,"lon":123.775029,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Malbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cumadcad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6103},{"i":7812,"cid":"25HN0034","pid":"P00936038VS","t":"Construction of Drainage Structure, Barangay Sacsac, Consolacion, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"XLA CONSTRUCTION","c":4939190.15,"abc":4950000.0,"fy":"2025","sd":"02/17/2025","cd":"2025-05-27","lat":10.397052,"lon":123.928082,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sacsac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6104},{"i":7813,"cid":"24FI0036","pid":"P00820482LZ","t":"Construction of Flood Mitigation Structure, Barangay Jamorawon, Milagros, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"MILAGROS (MASBATE)","deo":"Masbate 2nd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / A3 CONSTRUCTION & SUPPLY","c":62724809.74,"abc":62724809.74,"fy":"2024","sd":"02/20/2024","cd":"2024-10-16","lat":12.228056,"lon":123.578611,"sm":974,"fm":974,"tm":974,"am":974,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jamorawon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6105},{"i":7814,"cid":"22F00138","pid":"P00620320LZ","t":"Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 12+260 - Sta. 12+308 Right Side, Sta. 11+792 - Sta. 12+848 Left Side, Juban, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"JUBAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":174664974.6,"abc":174664974.6,"fy":"2022","sd":"05/12/2022","cd":"2023-12-08","lat":12.794448,"lon":123.994051,"sm":680,"fm":680,"tm":680,"am":680,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.02,"wp":[12.79445,123.99385],"wst":"matched","br":null,"len":1104.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6106},{"i":7815,"cid":"23F00104","pid":"P00725903LZ","t":"Rehabilitation/ Improvement of Revetment Wall Downstream at Sta. Teresita River, Iriga City, Camarines Sur, Sta. 9+304 - Sta. 9+529","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"IRIGA CITY (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":113285703.0,"abc":115642840.5,"fy":"2023","sd":"07/12/2023","cd":"2024-03-14","lat":13.487505,"lon":123.422636,"sm":648,"fm":648,"tm":648,"am":648,"md":0.0,"ls":"inside","ww":"Sta. Teresita","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":225.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6107},{"i":7816,"cid":"23FA0018","pid":"P00740479LZ","t":"Construction of Pinagbobong River Control, Barangay Pinagbobong, Tabaco City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL","c":135100000.0,"abc":135099999.9,"fy":"2023","sd":"04/14/2023","cd":"2023-12-24","lat":13.333875,"lon":123.685798,"sm":423,"fm":423,"tm":423,"am":423,"md":0.0,"ls":"inside","ww":"Pinagbobong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pinagbobong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6108},{"i":7817,"cid":"22HA0055","pid":"P00630645VS","t":"Construction of Flood Control / Drainage Projects, Tagbilaran City, Bohol","w":"Construction of Drainage Structure","rg":"Region VII","pv":"BOHOL","mu":"TAGBILARAN CITY (CAPITAL) (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"HUSAIN CONSTRUCTION AND SUPPLY CO.","c":4836297.35,"abc":4950000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-04-03","lat":9.63672,"lon":123.86729,"sm":1513,"fm":1513,"tm":1513,"am":1513,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6109},{"i":7818,"cid":"23FA0024","pid":"P00726281LZ","t":"Construction/Extension of River Control, Panarayon, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":29400000.0,"abc":29399999.73,"fy":"2023","sd":"03/27/2023","cd":"2023-08-15","lat":13.308033,"lon":123.775987,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6110},{"i":7819,"cid":"23HA0071","pid":"P00721903VS","t":"Construction of Labuon Flood Control, Calape, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CALAPE (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION)","c":50963842.39,"abc":51145000.0,"fy":"2023","sd":"05/11/2023","cd":"2024-02-14","lat":9.8792,"lon":123.8678,"sm":296,"fm":296,"tm":296,"am":296,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6111},{"i":7820,"cid":"22HN0075","pid":"P00632988VS","t":"Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package I)","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-12-19","lat":10.427647,"lon":123.92816,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panas","len":null,"ph":"Package I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6112},{"i":7821,"cid":"23HF0010","pid":"P00721672VS","t":"Construction of Shoreline Protection at Barangay Cabiangon along Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd, Pinamungajan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"PINAMUNGAJAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48912091.55,"abc":49000000.0,"fy":"2023","sd":"06/01/2023","cd":"2024-11-09","lat":10.30981,"lon":123.584792,"sm":1141,"fm":1141,"tm":1141,"am":1141,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabiangon along Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6113},{"i":7822,"cid":"23HO0076","pid":"P00721894VS","t":"Construction of River Retaining Wall Structures along Ylaya River (Purok Manga Section), Brgy. Ylaya, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":96497234.15,"abc":96497701.27,"fy":"2023","sd":"03/16/2023","cd":"2023-06-29","lat":10.001468,"lon":123.422979,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ylaya","len":null,"ph":null,"dup":[],"run":[],"cl":[7002,7701,7746,7799,7872,7913,7949],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1037},{"i":7823,"cid":"22KI0036","pid":"P00620155MN","t":"Construction of River Control, Brgy. Puntod, Plaridel, Misamis Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"PLARIDEL (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 1st District Engineering Office","co":"RRJ BUILDERS CONSTRUCTION AND GENERAL MERCHANDISE","c":29399995.0,"abc":29400000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-05","lat":8.608593,"lon":123.686,"sm":1154,"fm":1154,"tm":1154,"am":1154,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Puntod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6114},{"i":7824,"cid":"23FL0018","pid":"P00737579LZ","t":"Construction of Flood Control Structure, Barangay Jibong - Barangay Tagdon, Barcelona, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BARCELONA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":9603000.0,"abc":54450000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-29","lat":12.845819,"lon":124.146117,"sm":163,"fm":163,"tm":163,"am":163,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jibong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6115},{"i":7825,"cid":"23H00038","pid":"P00721771VS","t":"Construction of Flood Control Structure along Luyang River, Carmen, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CARMEN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS / VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":106149965.2,"abc":106150000.0,"fy":"2023","sd":"02/20/2023","cd":"2024-01-19","lat":10.603739,"lon":123.994967,"sm":338,"fm":338,"tm":338,"am":338,"md":0.0,"ls":"inside","ww":"Luyang","wn":"Luyang River","wd":0.0,"wp":[10.60375,123.99495],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6116},{"i":7826,"cid":"22FL0069","pid":"P00640589LZ","t":"Construction of Drainage, Poblacion, Barcelona, Sorsogon","w":"Construction of Drainage Structure","rg":"Region V","pv":"SORSOGON","mu":"BARCELONA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":19206000.0,"abc":19800000.0,"fy":"2022","sd":"08/19/2022","cd":"2023-03-16","lat":12.861836,"lon":124.146264,"sm":163,"fm":163,"tm":163,"am":163,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6117},{"i":7827,"cid":"24FK0019","pid":"P00820490LZ","t":"Construction of Malbog River Flood Mitigation Structure, Barangay Mayon, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":117298238.6,"abc":121589992.5,"fy":"2024","sd":"02/21/2024","cd":"2024-11-11","lat":12.952611,"lon":123.776386,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Malbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6118},{"i":7828,"cid":"23FB0055","pid":"P00736070LZ","t":"Construction of Bank Slope Protection along Buyo 2 River (Buyo 2 Section B), STA. 1+260 to STA. 1+800 (Both Sides), Manito, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"MANITO (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":96497986.44,"abc":96498496.16,"fy":"2023","sd":"02/27/2023","cd":"2023-09-15","lat":13.113753,"lon":123.869859,"sm":919,"fm":919,"tm":919,"am":919,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":540.0,"ph":"Section B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6119},{"i":7829,"cid":"24FO0056","pid":"P00823622LZ","t":"Construction of Ugsong River Flood Control Structure (Left and Right Side), Phase 2, Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96499961.98,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-12-31","lat":13.240527,"lon":123.585437,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Ugsong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6120},{"i":7830,"cid":"23FO0043","pid":"P00740464LZ","t":"Construction of River Control Dike Structure, barangay San Miguel, Oas, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"OAS (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RICHMAR CONSTRUCTION","c":72289030.0,"abc":72305000.0,"fy":"2023","sd":"04/27/2023","cd":"2023-10-23","lat":13.169523,"lon":123.423969,"sm":1031,"fm":1031,"tm":1031,"am":1031,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6121},{"i":7831,"cid":"23FK0052","pid":"P00740688LZ","t":"Construction of River Control, Brgy. Piot, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":18129860.73,"abc":18129984.4,"fy":"2023","sd":"05/25/2023","cd":"2023-10-20","lat":12.971216,"lon":123.995134,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6122},{"i":7832,"cid":"22HA0044","pid":"P00620031VS","t":"Construction of Flood Control Structure, Poblacion and Poblacion Weste, Sta. 000+000.00 - Sta. 006+366.890, Catigbian, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CATIGBIAN (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"CEBU 7H TECHNOCHEM INDUSTRIES, INC.","c":95439684.51,"abc":96500000.0,"fy":"2022","sd":"07/15/2022","cd":"2023-04-19","lat":9.84285,"lon":123.99541,"sm":355,"fm":355,"tm":355,"am":355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":6366.9,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6123},{"i":7833,"cid":"21FH0071","pid":"P00561838LZ","t":"Construction of Seawall, Brgy Panique, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Caramoran","deo":"Catanduanes District Engineering Office","co":"BICOL GOLDROCK CONSTRUCTION CORPORATION","c":14848757.9,"abc":14848859.47,"fy":"2021","sd":"01/18/2022","cd":"2023-01-30","lat":13.909885,"lon":124.146578,"sm":332,"fm":null,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panique","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6124},{"i":7834,"cid":"22FB0131","pid":"P00631000LZ","t":"Rehabilitation of Revetment, Upstream of Salvacion Spillway, Left Side, Barangay Anoling - Cabagnan, Camalig, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":57898374.99,"abc":57898447.57,"fy":"2022","sd":"03/16/2022","cd":"2022-10-18","lat":13.180499,"lon":123.68632,"sm":313,"fm":313,"tm":313,"am":485,"md":1.19,"ls":"adjacent","ww":"Salvacion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Anoling","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6125},{"i":7835,"cid":"22K00091","pid":"P00620213MN","t":"Construction of Flood Control Structure along Maranding River, Brgy. Maranding, Package 2, Sta. 0+000.00 - Sta. 0+304.486, Lala, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LALA (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"KOUZBARY BUILDERS / AL-NOORWAY CORPORATION","c":99395118.03,"abc":102983835.0,"fy":"2022","sd":"06/13/2022","cd":"2023-04-08","lat":7.919665,"lon":123.778011,"sm":741,"fm":741,"tm":741,"am":741,"md":0.0,"ls":"inside","ww":"Maranding","wn":"Maranding River","wd":0.03,"wp":[7.91989,123.77805],"wst":"matched","br":"Maranding","len":304.5,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6126},{"i":7836,"cid":"22KF0039","pid":"P00620146MN","t":"Construction of Slope Protection along Kulasihan Bridge, Sta. 0+000.00 - Sta. 0+280.00, Kolambugan, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"KOLAMBUGAN (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-10","lat":8.13229,"lon":123.928909,"sm":715,"fm":715,"tm":715,"am":879,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6127},{"i":7837,"cid":"23HA0041","pid":"P00721937VS","t":"Construction of Macaas Flood Control, Macaas, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"HUSAIN CONSTRUCTION AND SUPPLY CO.","c":11705000.0,"abc":11760000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-10-13","lat":9.9494,"lon":123.9955,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6128},{"i":7838,"cid":"23HH0126","pid":"P00732025VS","t":"Construction of Flood Mitigation Structure, Barangay Basak San Nicolas, Cebu City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"YES CONSTRUCTION","c":11834060.05,"abc":11880000.0,"fy":"2023","sd":"11/15/2023","cd":"2024-05-19","lat":10.283587,"lon":123.872753,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basak San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6129},{"i":7839,"cid":"22FO0033","pid":"P00630996LZ","t":"Rehabilitation of Paclas Flood Control Dike (Paclas Bridge, Right Side), Paclas, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":77097561.51,"abc":77097625.36,"fy":"2022","sd":"03/14/2022","cd":"2022-12-08","lat":13.29372,"lon":123.42408,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6130},{"i":7840,"cid":"21FH0123","pid":"P00561839LZ","t":"Construction of River Control, Brgy Panique, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Caramoran","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":14848733.84,"abc":14848758.86,"fy":"2021","sd":"01/18/2022","cd":"2022-07-26","lat":13.908021,"lon":124.147029,"sm":332,"fm":null,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panique","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6131},{"i":7841,"cid":"24HG0010","pid":"P00820193VS","t":"Construction of Argao CIS Flood Protection Dike, Argao, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ARGAO (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"AR ADLAWAN CONSTRUCTION","c":4850001.98,"abc":4900000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-04-10","lat":9.889675,"lon":123.586222,"sm":72,"fm":72,"tm":72,"am":72,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6132},{"i":7842,"cid":"23FB0121","pid":"P00726967LZ","t":"Construction/Upgrading/Rehabilitation of Flood Mitigation System at Barangay Salvacion to Barangay Busay River, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":72294714.06,"abc":72334861.15,"fy":"2023","sd":"04/19/2023","cd":"2023-10-24","lat":13.18084,"lon":123.68653,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Barangay Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6133},{"i":7843,"cid":"23FB0013","pid":"P00737387LZ","t":"Construction of River Bank Protection Works and Drainage System along Barangay Lamba, Legazpi City, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":57898479.61,"abc":57898489.6,"fy":"2023","sd":"02/27/2023","cd":"2023-09-03","lat":13.121005,"lon":123.779651,"sm":768,"fm":768,"tm":768,"am":768,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lamba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6134},{"i":7844,"cid":"23HD0031","pid":"P00721528VS","t":"Construction of Flood Control Structure, Poblacion, Sta. 000 + 000 - Sta. 000 + 260, Daanbantayan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DAANBANTAYAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"02/14/2023","cd":"2023-10-27","lat":11.25119,"lon":123.9971,"sm":470,"fm":470,"tm":470,"am":470,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":260.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6135},{"i":7845,"cid":"22FL0064","pid":"P00640588LZ","t":"Construction of Drainage System, Brgy Zone VII Poblacion, Bulan, Sorsogon","w":"Construction of Drainage Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"RMH CONSTRUCTION & SUPPLY","c":14404521.0,"abc":14850000.0,"fy":"2022","sd":"09/01/2022","cd":"2023-03-29","lat":12.672222,"lon":123.872778,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone VII Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6136},{"i":7846,"cid":"22FO0022","pid":"P00631375LZ","t":"Rehabilitation of San Agustin River Wall, Libon, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":19599978.9,"abc":19600000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-09-19","lat":13.32561,"lon":123.42455,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":"San Agustin","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6137},{"i":7847,"cid":"23HD0052","pid":"P00721668VS","t":"Construction of Drainage Outfall at Antonio y De Pio Highway, Barangay Tabunok, Sta. 000 + 000 - Sta. 000 + 300, Tabuelan, Cebu","w":"Construction of Drainage Structure","rg":"Region VII","pv":"CEBU","mu":"TABUELAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":5625200.0,"abc":5625200.0,"fy":"2023","sd":"02/09/2023","cd":"2023-05-26","lat":10.84169,"lon":123.87411,"sm":1506,"fm":1506,"tm":1506,"am":1506,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabunok","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6138},{"i":7848,"cid":"23FL0018","pid":"P00737580LZ","t":"Construction of Flood Control Structure, Barangay Bangate, Barcelona, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BARCELONA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":4801500.0,"abc":54450000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-29","lat":12.817377,"lon":124.14706,"sm":163,"fm":163,"tm":163,"am":163,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangate","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6139},{"i":7849,"cid":"22FO0088","pid":"P00640476LZ","t":"Construction of Revetment Wall, Binanawan River, Ligao City, Albay","w":"Construction of Revetment","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":89100000.0,"abc":89100000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-03-17","lat":13.241065,"lon":123.586735,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Binanawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6140},{"i":7850,"cid":"24HA0084","pid":"P00820879VS","t":"Construction of Viga Flood Control Structure, Antequera, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"ANTEQUERA (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":67500000.0,"abc":67550000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-04-10","lat":9.7498,"lon":123.929,"sm":65,"fm":65,"tm":65,"am":65,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6141},{"i":7851,"cid":"23FB0085","pid":"P00726977LZ","t":"Construction of Flood Control System along Pandan, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MANITO (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"PEDXING BUILDERS, INC. (FORMERLY: PEDXING BUILDERS) / PEDXING BUILDERS, INC. (FORMERLY: PEDXING BUILDERS)","c":72374494.71,"abc":72314383.82,"fy":"2023","sd":"04/04/2023","cd":"2023-10-19","lat":13.163556,"lon":123.686554,"sm":485,"fm":919,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":26,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":17.57,"text":"The record contradicts itself: the title and the pin point to Daraga, Albay, but the municipality field names Manito, Albay, 18 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":513},{"i":7852,"cid":"22HE0034","pid":"P00620036VS","t":"Construction of Flood Mitigation Structure, Abuno River, Sta. 0+000.00 - Sta. 0+537.00, Minglanilla, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MINGLANILLA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION)","c":91675000.0,"abc":91675000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-01-16","lat":10.244479,"lon":123.780194,"sm":979,"fm":979,"tm":979,"am":979,"md":0.0,"ls":"inside","ww":"Abuno","wn":"Abuno River","wd":0.02,"wp":[10.24431,123.78012],"wst":"matched","br":null,"len":537.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6142},{"i":7853,"cid":"23FA0020","pid":"P00740474LZ","t":"Construction of River Dike at San Andres, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96500000.0,"abc":96499976.03,"fy":"2023","sd":"04/12/2023","cd":"2023-12-10","lat":13.261016,"lon":123.780209,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6143},{"i":7854,"cid":"24FK0047","pid":"P00846126LZ","t":"Construction of River Control Structure, Brgy. Piot, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":9899988.72,"abc":79199947.93,"fy":"2024","sd":"05/17/2024","cd":"2024-12-11","lat":12.96974,"lon":123.997123,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6144},{"i":7855,"cid":"24FN0002","pid":"P00821382LZ","t":"Construction of Flood Control Structure along Bicol River, Barangay Ombao Heights Section, Bula, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"BULA (CAMARINES SUR)","deo":"Camarines Sur 5th District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":139925000.0,"abc":139925000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-09-20","lat":13.47025,"lon":123.42477,"sm":247,"fm":247,"tm":247,"am":648,"md":9.72,"ls":"outside","ww":"Bicol","wn":"Bicol River","wd":12.34,"wp":[13.41695,123.32459],"wst":"matched","br":"Ombao Heights Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":78,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":9.72,"text":"The pin is 9.7 km outside Bula, Camarines Sur, the nearest municipality the record claims. It falls in Iriga City, Camarines Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.71,"value":12.34,"text":"The title names Bicol, which OpenStreetMap maps through the stated municipality, but the pin is 12.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":27},{"i":7856,"cid":"23FA0038","pid":"P00740657LZ","t":"Construction of Flood Control System at San Rafael River, Sto. Domingo, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"SANTO DOMINGO (LIBOG) (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":49000000.0,"abc":48999998.94,"fy":"2023","sd":"06/08/2023","cd":"2023-11-03","lat":13.235982,"lon":123.780874,"sm":1411,"fm":1411,"tm":1411,"am":1411,"md":0.0,"ls":"inside","ww":"San Rafael","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6145},{"i":7857,"cid":"22HD0024","pid":"P00620032VS","t":"Construction of Flood Control Structure, Poblacion, Daanbantayan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DAANBANTAYAN (CEBU)","deo":"Cebu 4th District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-12","lat":11.25119,"lon":123.99791,"sm":470,"fm":470,"tm":470,"am":470,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6146},{"i":7858,"cid":"23K00212","pid":"P00733985MN","t":"Construction of Flood (Slope Protection) Bacolod Kalawi Section, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"BACOLOD-KALAWI (BACOLOD GRANDE) (LANAO DEL SUR)","deo":"Lanao del Sur 2nd District Engineering Office","co":"RENREN TRADING AND CONSTRUCTION SERVICES","c":28255451.89,"abc":28950000.0,"fy":"2023","sd":"06/15/2023","cd":"2024-01-22","lat":7.864048,"lon":124.148948,"sm":94,"fm":94,"tm":null,"am":94,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6147},{"i":7859,"cid":"22FJ0028","pid":"P00620749LZ","t":"Construction of Flood Control Concrete Revetment at Gaid River, Brgy. Gaid, Dimasalang, Masbate","w":"Construction of Revetment","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":35247120.61,"abc":35263856.64,"fy":"2022","sd":"02/16/2022","cd":"2022-09-12","lat":12.17839,"lon":123.87427,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":"Gaid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gaid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6148},{"i":7860,"cid":"23FB0115","pid":"P00740670LZ","t":"Construction of River Bank Protection Works and Drainage System along Brgy. Iluluan, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"CAMALIG (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"GRELIPS CONSTRUCTION & DEVELOPMENT / 3RB CONSTRUCTION & SUPPLY","c":48909052.85,"abc":48909111.71,"fy":"2023","sd":"04/17/2023","cd":"2023-10-13","lat":13.117176,"lon":123.58974,"sm":313,"fm":313,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iluluan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6149},{"i":7861,"cid":"22HN0073","pid":"P00632987VS","t":"Construction of Slope Protection along Lanipga Road, Brgy. Lanipga, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-16","lat":10.453952,"lon":123.92936,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lanipga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6150},{"i":7862,"cid":"22KF0016","pid":"P00620149MN","t":"Construction of Slope Protection along Pangi Bridge, (Upstream), Sta. 0+000.00 - Sta. 0+280.00, Baroy, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"BAROY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":37216949.34,"abc":39200000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-05","lat":8.004151,"lon":123.781235,"sm":170,"fm":170,"tm":170,"am":170,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6151},{"i":7863,"cid":"24H00016","pid":"P00820053VS","t":"Construction of Flood Control Structure along Cotcot River, Upstream, Liloan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LILOAN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"MC GEOMETRIC PROPORTIONS, INC. / ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":149847604.4,"abc":149849060.0,"fy":"2024","sd":"04/04/2024","cd":"2025-03-10","lat":10.438442,"lon":123.999612,"sm":790,"fm":790,"tm":790,"am":446,"md":0.01,"ls":"boundary","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6152},{"i":7864,"cid":"22FK0048","pid":"P00631483LZ","t":"Construction of Flood Control Project Cumadcad River at Sogoy Boundary, Brgy. Cumadcad, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":9797412.68,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":12.978307,"lon":123.783171,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Project Cumadcad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cumadcad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6153},{"i":7865,"cid":"22FM0014","pid":"P00620736LZ","t":"Construction of Talisay Shore Protection/Causeway (Package 4), Brgy. Talisay, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":41894584.96,"abc":44100000.0,"fy":"2022","sd":"03/17/2022","cd":"2022-09-05","lat":12.475556,"lon":123.686667,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talisay","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6154},{"i":7866,"cid":"24FJ0023","pid":"P00821017LZ","t":"Construction of Flood Control Concrete Revetment, Gaid River, Barangay Gaid, Dimasalang, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"DIMASALANG (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"HKP CONSTRUCTION AND SUPPLY / A3 CONSTRUCTION & SUPPLY","c":48962315.19,"abc":48978049.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-12","lat":12.180299,"lon":123.875271,"sm":507,"fm":507,"tm":507,"am":507,"md":0.0,"ls":"inside","ww":"Gaid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gaid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6155},{"i":7867,"cid":"23HI0062","pid":"P00744359VS","t":"Rehabilitation of FC Structure along Cotcot River, Liloan, Cebu","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"CEBU","mu":"LILOAN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":15484008.07,"abc":15541325.0,"fy":"2023","sd":"03/30/2023","cd":"2023-07-27","lat":10.438372,"lon":123.999691,"sm":790,"fm":790,"tm":790,"am":790,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6156},{"i":7868,"cid":"22F00161","pid":"P00631447LZ","t":"Construction of Obi River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":38600000.0,"abc":77199160.36,"fy":"2022","sd":"06/28/2022","cd":"2023-07-08","lat":13.756505,"lon":124.148948,"sm":332,"fm":332,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":"Obi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Obi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6157},{"i":7869,"cid":"22KF0020","pid":"P00620145MN","t":"Construction of Slope Protection along Baroy Bridge, (Upstream), Sta. 0+000.00 - Sta. 0+280.00, Baroy, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"BAROY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-25","lat":8.020833,"lon":123.783333,"sm":170,"fm":170,"tm":170,"am":170,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6158},{"i":7870,"cid":"23KJ0022","pid":"P00721383MN","t":"Construction of Slope Protection (Downstream) of Panguil Bridge along Ozamiz-Pagadian Road, Bonifacio, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"BONIFACIO (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"MINDANAO ROCK","c":47530000.0,"abc":49000000.0,"fy":"2023","sd":"02/10/2023","cd":"2025-01-28","lat":8.048171,"lon":123.591208,"sm":225,"fm":225,"tm":225,"am":225,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6159},{"i":7871,"cid":"23F00004","pid":"P00726624LZ","t":"Rehabilitation of Revetment along Quinale River, Barangay Labnig-Tuliw, Malinao, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"MAKAPA CORPORATION","c":101324366.0,"abc":101324366.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-02","lat":13.390771,"lon":123.686752,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Quinale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Labnig-Tuliw","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6160},{"i":7872,"cid":"23HO0100","pid":"P00721896VS","t":"Construction of River Retaining Wall Structures along Ylaya River (Brgy. Ylaya - Brgy. Poblacion), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":96498238.76,"abc":96498253.02,"fy":"2023","sd":"03/16/2023","cd":"2023-07-10","lat":10.001118,"lon":123.425082,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Ylaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ylaya","len":null,"ph":null,"dup":[],"run":[],"cl":[7002,7701,7746,7799,7822,7913,7949],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1038},{"i":7873,"cid":"22KF0025","pid":"P00620150MN","t":"Construction of Slope Protection along Segapod Bridge, (Downstream) (L/S), Sta. 0+000.00 - Sta. 0+280.00, Maigo, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"MAIGO (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-06-12","lat":8.132741,"lon":123.929387,"sm":879,"fm":879,"tm":879,"am":879,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":280.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6161},{"i":7874,"cid":"22HI0017","pid":"P00620026VS","t":"Construction of Flood Control Structure along Cotcot River, Compostela, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"COMPOSTELA (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION) / SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD","c":56548278.06,"abc":56578915.0,"fy":"2022","sd":"03/07/2022","cd":"2022-11-08","lat":10.438358,"lon":124.000112,"sm":446,"fm":446,"tm":446,"am":446,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6162},{"i":7875,"cid":"24HN0162","pid":"P00834653VS","t":"Construction of Drainage System, Barangay Casuntingan, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":24205775.0,"abc":24257940.0,"fy":"2024","sd":"07/04/2024","cd":"2025-02-24","lat":10.348742,"lon":123.929593,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Casuntingan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6163},{"i":7876,"cid":"23FL0020","pid":"P00737577LZ","t":"Construction of Flood Mitigation Structure/Shoreline Protection, Barangay Manlabong, Prieto Diaz, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"PRIETO DIAZ (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":4801500.0,"abc":4950000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-07-25","lat":13.072133,"lon":124.14949,"sm":1175,"fm":1175,"tm":1175,"am":1175,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manlabong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6164},{"i":7877,"cid":"22FK0053","pid":"P00640596LZ","t":"Construction of Quirapi Seawall, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":29699990.04,"abc":49499989.68,"fy":"2022","sd":"04/04/2022","cd":"2023-02-24","lat":12.867567,"lon":123.78519,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6165},{"i":7878,"cid":"22FK0074","pid":"P00630975LZ","t":"Construction of Flood Mitigation Structures and Drainage System at Barangay Dancalan, Donsol, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":65156884.39,"abc":67549977.01,"fy":"2022","sd":"06/15/2022","cd":"2023-03-07","lat":12.91197,"lon":123.59154,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dancalan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6166},{"i":7879,"cid":"22FA0075","pid":"P00640569LZ","t":"Guinobat Flood Mitigation and River Control, Tabaco City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF TABACO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":14850000.0,"abc":66329638.23,"fy":"2022","sd":"06/23/2022","cd":"2022-11-11","lat":13.2156,"lon":123.42549,"sm":423,"fm":423,"tm":423,"am":1031,"md":21.78,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":43,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.95,"value":21.78,"text":"The pin is 21.8 km outside City of Tabaco, Albay, the nearest municipality the record claims. It falls in Oas, Albay.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":264},{"i":7880,"cid":"23HI0003","pid":"P00721828VS","t":"Construction of Flood Control Structure along Cotcot River, Liloan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"LILOAN (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":48952952.29,"abc":49000000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-07-10","lat":10.436113,"lon":124.000656,"sm":790,"fm":790,"tm":790,"am":790,"md":0.0,"ls":"inside","ww":"Cotcot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6167},{"i":7881,"cid":"24FM0012","pid":"P00821012LZ","t":"Construction of Talisay Shore Protection (Package 5), Barangay Talisay, San Fernando, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"SAN FERNANDO (MASBATE)","deo":"Masbate 1st District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":48999991.64,"abc":49000000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-29","lat":12.48,"lon":123.686944,"sm":1272,"fm":1272,"tm":1272,"am":1272,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talisay","len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":464},{"i":7882,"cid":"23FL0010","pid":"P00726315LZ","t":"Rehabilitation/ Improvement of Flood Protection Measures at Calao, Prieto Diaz, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"PRIETO DIAZ (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":28511748.95,"abc":58800000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-11-15","lat":13.011432,"lon":124.149996,"sm":1175,"fm":1175,"tm":1175,"am":1175,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6168},{"i":7883,"cid":"24KG0019","pid":"P00820908MN","t":"Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Sagadan Bridge (B00961MN), Downstream (R/S), Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION) / LANAO BUILDER AND ENTERPRISES","c":115800000.0,"abc":115800000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-12-10","lat":8.03947,"lon":123.7874,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6169},{"i":7884,"cid":"22FL0027","pid":"P00632974LZ","t":"Construction of Flood Control Structure, Barangay Zone 2 Poblacion, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"DOUBLE R CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":19001820.12,"abc":49500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-08-08","lat":12.658056,"lon":123.875278,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 2 Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6170},{"i":7885,"cid":"22FK0057","pid":"P00640598LZ","t":"Construction of Seawall (PWWD -Rawis), Donsol ,Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY)","c":39600000.0,"abc":59399996.63,"fy":"2022","sd":"04/04/2022","cd":"2022-11-11","lat":12.905518,"lon":123.591771,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6171},{"i":7886,"cid":"22F00021","pid":"P00620305LZ","t":"Construction/ Improvement of Talisay River Flood Mitigation System (Zone IV Section), Libon, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"LIBON (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"MAKAPA CORPORATION","c":48249492.67,"abc":48249492.67,"fy":"2022","sd":"03/21/2022","cd":"2022-12-20","lat":13.289351,"lon":123.425576,"sm":782,"fm":782,"tm":782,"am":782,"md":0.0,"ls":"inside","ww":"Talisay","wn":"Talisay River","wd":0.83,"wp":[13.28452,123.41969],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6172},{"i":7887,"cid":"22FK0008","pid":"P00620757LZ","t":"Construction of Flood Mitigation Structure and Embankment of Lungib Seawall, Casiguran, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASIGURAN (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":37978793.24,"abc":39199988.75,"fy":"2022","sd":"02/16/2022","cd":"2022-09-29","lat":12.870288,"lon":124.001622,"sm":347,"fm":347,"tm":347,"am":347,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6173},{"i":7888,"cid":"23FA0030","pid":"P00737553LZ","t":"Construction of Libod River Control/Flood Mitigation, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":19800000.0,"abc":30689724.37,"fy":"2023","sd":"04/27/2023","cd":"2023-08-31","lat":13.396667,"lon":123.688333,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Libod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6174},{"i":7889,"cid":"22HD0017","pid":"P00620119VS","t":"Construction of Flood Control Structure at Barangay Tacup, Sta. 0+000 - Sta. 0+774, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TABOGON (CEBU)","deo":"Cebu 4th District Engineering Office","co":"JJ &J CONSTRUCTION & GENERAL SUPPLY / SAN NARCISO  BUILDERS CORPORATION(FOR. SAN NARCISO","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-12-29","lat":10.973333,"lon":123.930556,"sm":1355,"fm":1503,"tm":1355,"am":1355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tacup","len":774.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":3.69,"text":"The record contradicts itself: the title and the pin point to San Remigio, Cebu, but the municipality field names Tabogon, Cebu, 4 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":524},{"i":7890,"cid":"22F00161","pid":"P00631446LZ","t":"Construction of Hitoma River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":38598662.63,"abc":77199160.36,"fy":"2022","sd":"06/28/2022","cd":"2023-07-08","lat":13.758786,"lon":124.15263,"sm":332,"fm":332,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":"Hitoma","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Obi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6175},{"i":7891,"cid":"22HF0051","pid":"P00620124VS","t":"Construction of Flood Mitigation Structure at Mangoto River, Sta. 1+040 - Sta. 1+347, Brgy. Mangoto, Pinamungajan, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"PINAMUNGAJAN (CEBU)","deo":"Cebu 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":48749331.99,"abc":49000000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-03-02","lat":10.260857,"lon":123.591822,"sm":1141,"fm":1141,"tm":1141,"am":1141,"md":0.0,"ls":"inside","ww":"Mangoto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mangoto","len":307.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6176},{"i":7892,"cid":"24GQ0052","pid":"P00820853VS","t":"Construction of Flood Control Structure, Vascoña River along Bacolod, North Road, San Carlos, City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"RKVT CONSTRUCTION / WILKINSON CONSTRUCTION","c":72374843.77,"abc":72375000.0,"fy":"2024","sd":"05/07/2024","cd":"2025-02-06","lat":10.50555,"lon":123.42611,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Vascoña","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6177},{"i":7893,"cid":"23FK0039","pid":"P00742488LZ","t":"Construction of Flood Mitigation Structure of Brgy. Siuton Flood Control, Magallanes, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"MAGALLANES (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":49499988.79,"abc":98999982.07,"fy":"2023","sd":"04/12/2023","cd":"2024-02-21","lat":12.795102,"lon":123.875502,"sm":862,"fm":862,"tm":862,"am":862,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Siuton Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6178},{"i":7894,"cid":"22FK0107","pid":"P00640594LZ","t":"Construction of Casiguran Coastal Road, Casiguran, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASIGURAN (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"C.T. LEONCIO CONSTRUCTION & TRADING","c":48015009.98,"abc":49499997.74,"fy":"2022","sd":"08/16/2022","cd":"2023-01-16","lat":12.873466,"lon":124.001691,"sm":347,"fm":347,"tm":347,"am":347,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6179},{"i":7895,"cid":"23FB0097","pid":"P00727381LZ","t":"Construction of Flood Control System along Bongalon-Pandan River, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"VERZONTAL INFRASTRUCTURE CORPORATION (FORMERLY: VERZONTAL BUILDERS, INC.)","c":48962384.09,"abc":48962411.81,"fy":"2023","sd":"04/05/2023","cd":"2023-10-01","lat":13.161069,"lon":123.688896,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Bongalon-Pandan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6180},{"i":7896,"cid":"24HN0090","pid":"P00835011VS","t":"Construction of River Capacity Enhancement Structure along Butuanon River, Barangay Casuntingan-Barangay Cabancalan, Mandaue City, Cebu, (Phase 6)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":98899888.0,"abc":99000000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-08-19","lat":10.353048,"lon":123.93157,"sm":915,"fm":915,"tm":362,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.02,"wp":[10.35304,123.93175],"wst":"matched","br":"Casuntingan-Barangay Cabancalan","len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6181},{"i":7897,"cid":"22F00148","pid":"P00639399LZ","t":"Rehabilitation of Flood Control Structure at Binagasbasan, Brgy. Paraiso, San Miguel, Catanduanes","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN MIGUEL (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":110916629.2,"abc":110916629.2,"fy":"2022","sd":"07/29/2022","cd":"2023-06-30","lat":13.747093,"lon":124.152883,"sm":1331,"fm":1331,"tm":1331,"am":332,"md":2.59,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paraiso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6182},{"i":7898,"cid":"24FO0038","pid":"P00823603LZ","t":"Construction of Flood Mitigation Structure along Basag River (Upstream of Spillway facing Left And Right Side ), Barangay Basag, Ligao City, Albay.","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) / JACKNEL CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-08-31","lat":13.258564,"lon":123.592443,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Basag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Basag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6183},{"i":7899,"cid":"22KF0085","pid":"P00620027MN","t":"Construction of Drainage System at Poblacion, Tubod, Lanao del Norte","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":53075000.0,"abc":53075000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-02-14","lat":8.04814,"lon":123.7923,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6184},{"i":7900,"cid":"23H00047","pid":"P00721772VS","t":"Construction of Flood Control Structure along Bagatayam River, Sogod, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SOGOD (CEBU)","deo":"Cebu 5th District Engineering Office","co":"VSP STRUCTURE VENTURES CORP. (FORMERLY: VIRLO CONSTRUCTION)","c":106149936.7,"abc":106150000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-05","lat":10.762624,"lon":124.001899,"sm":1474,"fm":1474,"tm":1474,"am":1474,"md":0.0,"ls":"inside","ww":"Bagatayam","wn":"Bagatayam River","wd":0.41,"wp":[10.759,124.00131],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6185},{"i":7901,"cid":"23GQ0024","pid":"P00721505VS","t":"Construction of Flood Control Structure of Palampas River (Downstream) along Bacolod North Road, San Carlos City, Negros Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region VI","pv":"NEGROS OCCIDENTAL","mu":"SAN CARLOS CITY (NEGROS OCCIDENTAL)","deo":"Negros Occidental 5th District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":72374744.87,"abc":72374726.64,"fy":"2023","sd":"03/02/2023","cd":"2023-10-02","lat":10.49628,"lon":123.42695,"sm":1262,"fm":1262,"tm":1262,"am":1262,"md":0.0,"ls":"inside","ww":"Palampas","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6186},{"i":7902,"cid":"24KG0024","pid":"P00821088MN","t":"Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Titunod Bridge II (B00956MN), Upstream (R/S), Kolambugan, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"KOLAMBUGAN (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"01/25/2024","cd":"2024-09-09","lat":8.10174,"lon":123.87588,"sm":715,"fm":715,"tm":715,"am":715,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6187},{"i":7903,"cid":"22KF0021","pid":"P00620035MN","t":"Construction of Flood Control Structures along Dalama (Upstream-Left Side), Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":80641190.0,"abc":80641190.0,"fy":"2022","sd":"03/18/2022","cd":"2023-01-06","lat":7.92533,"lon":123.93261,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6188},{"i":7904,"cid":"22KJ0009","pid":"P00630585MN","t":"Construction of Slope Protection (Upstream & Downstream) of Panalsalan Bridge 2 along Ozamiz-Pagadian Road, Tangub City, Misamis Occidental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS OCCIDENTAL","mu":"TANGUB CITY (MISAMIS OCCIDENTAL)","deo":"Misamis Occidental 2nd District Engineering Office","co":"WEISENWORK CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"01/24/2022","cd":"2022-11-04","lat":8.054146,"lon":123.689319,"sm":1545,"fm":1545,"tm":1545,"am":1545,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6189},{"i":7905,"cid":"23FL0018","pid":"P00737575LZ","t":"Construction of Flood Mitigation Structure/Shoreline Protection, Barangay Macabari, Barcelona, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BARCELONA (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"ALHADRAX CONSTRUCTION AND SUPPLY","c":19773947.82,"abc":54450000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-10-29","lat":12.820425,"lon":124.153558,"sm":163,"fm":163,"tm":163,"am":163,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macabari","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6190},{"i":7906,"cid":"23FK0028","pid":"P00740687LZ","t":"Construction of Manlato River Control, Donsol, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":27439999.43,"abc":56939964.51,"fy":"2023","sd":"03/27/2023","cd":"2023-11-17","lat":13.011349,"lon":123.593377,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":"Manlato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6191},{"i":7907,"cid":"22FK0048","pid":"P00631482LZ","t":"Construction of Flood Control Project along Sinalot Creek at Purok Sunflower, Brgy. Cumadcad, Castilla, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CASTILLA (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":9797964.61,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":12.977497,"lon":123.792962,"sm":348,"fm":348,"tm":348,"am":348,"md":0.0,"ls":"inside","ww":"Sinalot","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cumadcad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6192},{"i":7908,"cid":"22FL0018","pid":"P00631472LZ","t":"Construction of Flood Control Structure in Batang River, Barangay Batang, Irosin, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"IROSIN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":28518000.0,"abc":58800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-10-13","lat":12.70027,"lon":124.00221,"sm":649,"fm":649,"tm":649,"am":649,"md":0.0,"ls":"inside","ww":"Batang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6193},{"i":7909,"cid":"23HH0077","pid":"P00721539VS","t":"Construction of Flood Mitigation Structure at Barangay Cogon Pardo, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":86670915.0,"abc":86850000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-12-11","lat":10.284233,"lon":123.875911,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cogon Pardo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6194},{"i":7910,"cid":"24FA0021","pid":"P00821613LZ","t":"Construction of Flood Mitigation Facilities along Kabilugan/Velasco/Bato River Basin (Lake Bicol), Barangay Awang, Malinao, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"MALINAO (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":49000000.0,"abc":48999999.64,"fy":"2024","sd":"04/29/2024","cd":"2024-08-28","lat":13.375613,"lon":123.689443,"sm":897,"fm":897,"tm":897,"am":897,"md":0.0,"ls":"inside","ww":"Bicol","wn":"Bicol River","wd":37.78,"wp":[13.37884,123.34053],"wst":"matched","br":"Awang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6195},{"i":7911,"cid":"22KF0019","pid":"P00620036MN","t":"Construction of Flood Control Structures along Dalama (Upstream-Right Side), Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":80641190.0,"abc":80641190.0,"fy":"2022","sd":"03/18/2022","cd":"2023-01-04","lat":7.92507,"lon":123.93271,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6196},{"i":7912,"cid":"23FK0006","pid":"P00737582LZ","t":"Rehabilitation of Seawall, Barangay Bororan, Donsol, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":4949990.65,"abc":71669931.81,"fy":"2023","sd":"02/23/2023","cd":"2023-11-22","lat":12.909389,"lon":123.593499,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bororan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6197},{"i":7913,"cid":"24HO0107","pid":"P00834592VS","t":"Construction of Revetment Wall at Barangay Ylaya - Barangay Tupas Phase 1, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":57895609.96,"abc":57896109.96,"fy":"2024","sd":"03/18/2024","cd":"2024-06-11","lat":9.997583,"lon":123.427182,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ylaya","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[7002,7701,7746,7799,7822,7872,7949],"L":"field","s":19,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1091},{"i":7914,"cid":"22KF0022","pid":"P00620138MN","t":"Construction of Flood Control and Drainage at Poblacion, Sta. 0+000.00 - Sta. 1+600.00, Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-02-06","lat":8.048439,"lon":123.793402,"sm":1595,"fm":1595,"tm":1595,"am":1595,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6198},{"i":7915,"cid":"24FK0047","pid":"P00846131LZ","t":"Construction of Flood Mitigation Structure along Salvador H. Escudero III, Sorsogon River Downstream, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"AREMAR CONSTRUCTION CORPORATION","c":49499971.87,"abc":79199947.93,"fy":"2024","sd":"05/17/2024","cd":"2024-12-11","lat":12.985175,"lon":124.002973,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Sorsogon","wn":"Sorsogon River","wd":0.01,"wp":[12.98528,124.00301],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6199},{"i":7916,"cid":"21F00093","pid":"P00525687LZ","t":"Rehabilitation of Revetment Wall along Managa-Naga River, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"Bulan","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":96499967.01,"abc":96499967.01,"fy":"2021","sd":"11/02/2021","cd":"2022-12-15","lat":12.65998,"lon":123.8763,"sm":250,"fm":null,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Managa-Naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6200},{"i":7917,"cid":"24HN0102","pid":"P00820857VS","t":"Construction of Flood Control Structure along Butuanon River, Phase 5, Barangay Tingub - Barangay Canduman, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":57800000.0,"abc":57900000.0,"fy":"2024","sd":"03/15/2024","cd":"2024-12-27","lat":10.349969,"lon":123.933517,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34993,123.93358],"wst":"matched","br":"Tingub","len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6201},{"i":7918,"cid":"24HO0095","pid":"P00834591VS","t":"Construction of Revetment Wall at Barangay Tupas - Barangay Ylaya Phase 2, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":57896010.27,"abc":57896114.55,"fy":"2024","sd":"03/18/2024","cd":"2024-07-10","lat":9.998268,"lon":123.427355,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupas","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[7006,7011,7055,7056,7064,7613,7927,7983,7992],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1002},{"i":7919,"cid":"23F00122","pid":"P00740478LZ","t":"Construction of Flood Control Structure, Ligao City, Albay Phase II","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL / SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":192932374.8,"abc":192932380.2,"fy":"2023","sd":"04/24/2023","cd":"2023-09-07","lat":13.249069,"lon":123.594145,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6202},{"i":7920,"cid":"23FB0066","pid":"P00736143LZ","t":"Construction of Flood Control Mitigation Structure and Drainage System Tributaries to Yawa River (Budiao - Miisi Section) Phase 3, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":48248322.88,"abc":48248494.74,"fy":"2023","sd":"07/03/2023","cd":"2023-11-30","lat":13.179656,"lon":123.690236,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Yawa","wn":"Yawa River","wd":1.54,"wp":[13.16742,123.69697],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6203},{"i":7921,"cid":"24FO0039","pid":"P00823591LZ","t":"Construction of Basag River Control Structure, Upstream of Spillway, Barangay Basag, Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-10-31","lat":13.261336,"lon":123.595208,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Basag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Basag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6204},{"i":7922,"cid":"23FA0030","pid":"P00737554LZ","t":"Construction of Flood Control and Slope Protection at Barangay 7, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":4950000.0,"abc":30689724.37,"fy":"2023","sd":"04/27/2023","cd":"2023-08-31","lat":13.288732,"lon":123.794823,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"7","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6205},{"i":7923,"cid":"23H00070","pid":"P00721773VS","t":"Construction of Flood Control Structure along Bawo River, Catmon-Side, Catmon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CATMON (CEBU)","deo":"Cebu 5th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":77199721.33,"abc":77200000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-12-11","lat":10.72784,"lon":124.003446,"sm":356,"fm":356,"tm":356,"am":356,"md":0.0,"ls":"inside","ww":"Bawo","wn":"Bawo River","wd":0.0,"wp":[10.72784,124.00345],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6206},{"i":7924,"cid":"22FL0027","pid":"P00632976LZ","t":"Construction of River Control Structure, Barangay N. Roque, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"DOUBLE R CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY","c":28505318.96,"abc":49500000.0,"fy":"2022","sd":"02/14/2022","cd":"2022-08-08","lat":12.6625,"lon":123.933889,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"N. Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6207},{"i":7925,"cid":"24HA0002","pid":"P00820074VS","t":"Construction of Villanueva Tubigon Flood Control, Tubigon, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TUBIGON (BOHOL)","deo":"Bohol 1st District Engineering Office","co":"N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":52974619.82,"abc":53075000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-10-17","lat":9.9105,"lon":123.934,"sm":1592,"fm":1592,"tm":1592,"am":1592,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6208},{"i":7926,"cid":"22FK0048","pid":"P00632978LZ","t":"Construction of Drainage System, Barangay Market Site Barangay 3, Donsol, Sorsogon","w":"Construction of Drainage Structure","rg":"Region V","pv":"SORSOGON","mu":"DONSOL (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":4947163.72,"abc":58899904.98,"fy":"2022","sd":"03/17/2022","cd":"2022-09-12","lat":12.90556,"lon":123.59531,"sm":530,"fm":530,"tm":530,"am":530,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Market Site Barangay 3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6209},{"i":7927,"cid":"24HO0106","pid":"P00834590VS","t":"Construction of Revetment Wall at Barangay Tupas - Barangay Libo-o Phase 2, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":57896205.85,"abc":57896705.85,"fy":"2024","sd":"03/18/2024","cd":"2024-07-02","lat":9.98792,"lon":123.428957,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupas","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[7006,7011,7055,7056,7064,7613,7918,7983,7992],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1003},{"i":7928,"cid":"22FK0084","pid":"P00640597LZ","t":"Construction of River Control (Downstream) Brgy. Bulabog, West District, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":37118332.97,"abc":37124986.19,"fy":"2022","sd":"07/11/2022","cd":"2023-03-24","lat":12.99761,"lon":123.93429,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulabog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6210},{"i":7929,"cid":"24KG0017","pid":"P00821220MN","t":"Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Titunod Bridge II (B00956MN), Downstream (R/S), Kolambugan, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"BAROY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":48009820.77,"abc":49000000.0,"fy":"2024","sd":"01/25/2024","cd":"2024-09-06","lat":8.10215,"lon":123.87639,"sm":715,"fm":170,"tm":715,"am":715,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":11.76,"text":"The record contradicts itself: the title and the pin point to Kolambugan, Lanao del Norte, but the municipality field names Baroy, Lanao del Norte, 12 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":545},{"i":7930,"cid":"22F00002","pid":"P00620312LZ","t":"Construction/Improvement of Flood Control at Basud, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY / FS CO BUILDERS AND SUPPLY","c":138408985.0,"abc":138372507.5,"fy":"2022","sd":"03/28/2022","cd":"2022-12-15","lat":13.283156,"lon":123.795641,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6211},{"i":7931,"cid":"24FB0144","pid":"P00844785LZ","t":"Construction of Dike including Drainage System along Barangay Busay, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MJMS CONSTRUCTION & DEVELOPMENT CORP.","c":29398860.04,"abc":29398953.17,"fy":"2024","sd":"05/29/2024","cd":"2024-10-01","lat":13.17269,"lon":123.692066,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Busay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6212},{"i":7932,"cid":"23FK0089","pid":"P00742491LZ","t":"Construction of Flood Mitigation Structure along Salvador H. Escudero III, Sorsogon River Downstream, Sorsogon City, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / CHEEREL CONSTRUCTION & SUPPLY","c":28643555.23,"abc":54449963.17,"fy":"2023","sd":"07/18/2023","cd":"2024-03-05","lat":12.984972,"lon":124.003624,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Sorsogon","wn":"Sorsogon River","wd":0.02,"wp":[12.98516,124.00362],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6213},{"i":7933,"cid":"23HG0009","pid":"P00721530VS","t":"Construction of Talaytay Flood Control, Talaytay, Argao, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"ARGAO (CEBU)","deo":"Cebu 2nd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":67549021.12,"abc":67550000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-10-09","lat":9.888964,"lon":123.595753,"sm":72,"fm":72,"tm":72,"am":72,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6214},{"i":7934,"cid":"23HN0098","pid":"P00733286VS","t":"Construction of Slope Protection System along Panas Road, Barangay Panas (Phase III), Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-12-15","lat":10.4761,"lon":123.93465,"sm":453,"fm":453,"tm":453,"am":446,"md":1.56,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panas","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6215},{"i":7935,"cid":"20F00105","pid":"P00448861LZ","t":"Construction of Flood Control Structure, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"Bulan","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":144546166.9,"abc":144750970.2,"fy":"2020","sd":"12/11/2020","cd":"2022-12-10","lat":12.663769,"lon":123.876757,"sm":250,"fm":null,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6216},{"i":7936,"cid":"22FA0061","pid":"P00631328LZ","t":"Construction of River Bank Protection along Baclayon River (Phase 1), Labanon Section, Barangay Basud, Bacacay, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":19600000.0,"abc":34299735.52,"fy":"2022","sd":"08/25/2022","cd":"2023-01-27","lat":13.279318,"lon":123.796061,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Baclayon","wn":"Baclayon River","wd":0.01,"wp":[13.27929,123.79611],"wst":"matched","br":"Basud","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6217},{"i":7937,"cid":"22FB0205","pid":"P00621547LZ","t":"Rehabilitation of Flood Mitigation Structure at Budiao-Malabog River, Sta. 1 + 500 - Sta. 1 + 750, Daraga, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48248324.35,"abc":48248347.9,"fy":"2022","sd":"04/11/2022","cd":"2022-10-07","lat":13.173908,"lon":123.692689,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Budiao-Malabog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6218},{"i":7938,"cid":"22FK0030","pid":"P00630963LZ","t":"Construction of Flood Control Protection Against Flooding at Barangay San Juan Roro - Burabod River, Sorsogon City, Sorsogon","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":67544199.13,"abc":87149953.56,"fy":"2022","sd":"02/23/2022","cd":"2022-11-15","lat":12.974374,"lon":124.004126,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Burabod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Juan Roro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6219},{"i":7939,"cid":"22FO0035","pid":"P00630984LZ","t":"Construction of Nasisi River Flood Mitigation Structure (Brgy. Nabonton), Ligao City, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"CITY OF LIGAO (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.","c":56047451.41,"abc":57900000.0,"fy":"2022","sd":"06/09/2022","cd":"2023-06-15","lat":13.257078,"lon":123.59743,"sm":396,"fm":396,"tm":396,"am":396,"md":0.0,"ls":"inside","ww":"Nasisi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Nabonton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6220},{"i":7940,"cid":"24HD0104","pid":"P00834646VS","t":"Construction of Flood Control Structure at Barangay Samosa, Tabogon, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"TABOGON (CEBU)","deo":"Cebu 4th District Engineering Office","co":"QG DEVELOPMENT CORPORATION","c":19600000.0,"abc":19600000.0,"fy":"2024","sd":"07/10/2024","cd":"2024-12-21","lat":10.97153,"lon":124.00424,"sm":1503,"fm":1503,"tm":1503,"am":1503,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Samosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6221},{"i":7941,"cid":"23HO0090","pid":"P00721892VS","t":"Construction of Road Dike at Brgy. Libo-o - Brgy. Ylaya, Ronda, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"AR ADLAWAN CONSTRUCTION","c":96497197.73,"abc":96497353.67,"fy":"2023","sd":"03/16/2023","cd":"2023-09-26","lat":9.986925,"lon":123.429117,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libo-o","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6222},{"i":7942,"cid":"22HN0078","pid":"P00632989VS","t":"Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package II)","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-01-16","lat":10.435856,"lon":123.934818,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panas","len":null,"ph":"Package II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6223},{"i":7943,"cid":"22FG0061","pid":"P00639547LZ","t":"Construction of Flood Mitigation Structure (Seawall) Barangay 1 to Barangay 4, Garchitorena, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GARCHITORENA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"PARTIDO CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/05/2022","cd":"2023-06-05","lat":13.881685,"lon":123.693554,"sm":566,"fm":566,"tm":566,"am":566,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6224},{"i":7944,"cid":"20F00105","pid":"P00448861LZ","t":"Construction of Flood Control Structure, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"Bulan","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":144546166.9,"abc":144750970.2,"fy":"2021","sd":"12/11/2020","cd":"2022-12-10","lat":12.663769,"lon":123.876757,"sm":250,"fm":null,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6225},{"i":7945,"cid":"22FA0061","pid":"P00631329LZ","t":"Construction of River Bank Protection along Baclayon River (Phase 2), Labanon Section, Barangay Basud, Bacacay, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":14700000.0,"abc":34299735.52,"fy":"2022","sd":"08/25/2022","cd":"2023-01-27","lat":13.279184,"lon":123.796253,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Baclayon","wn":"Baclayon River","wd":0.02,"wp":[13.27928,123.79611],"wst":"matched","br":"Basud","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6226},{"i":7946,"cid":"22FO0091","pid":"P00640578LZ","t":"Rehabilitation of San Francisco River Flood Mitigation Structure, Guinobatan, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"GUINOBATAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY","c":49499990.45,"abc":49500000.0,"fy":"2022","sd":"04/11/2022","cd":"2022-11-25","lat":13.195022,"lon":123.598655,"sm":603,"fm":603,"tm":603,"am":603,"md":0.0,"ls":"inside","ww":"San Francisco","wn":"San Francisco River","wd":0.02,"wp":[13.19512,123.59882],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6227},{"i":7947,"cid":"22FK0030","pid":"P00631484LZ","t":"Construction of Flood Control Structure along Gomihan River, Sorsogon City","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"CITY OF SORSOGON (CAPITAL) (SORSOGON)","deo":"Sorsogon District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":19599857.32,"abc":87149953.56,"fy":"2022","sd":"02/23/2022","cd":"2022-11-15","lat":12.98569,"lon":124.00507,"sm":422,"fm":422,"tm":422,"am":422,"md":0.0,"ls":"inside","ww":"Gomihan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6228},{"i":7948,"cid":"23FB0091","pid":"P00740667LZ","t":"Construction of Flood Protection (Dike) along Brgy. Iluluan, Camalig, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"LEGAZPI CITY (CAPITAL) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":48824307.51,"abc":48824408.37,"fy":"2023","sd":"04/05/2023","cd":"2023-10-01","lat":13.130351,"lon":123.598724,"sm":313,"fm":768,"tm":313,"am":313,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iluluan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":12.6,"text":"The record contradicts itself: the title and the pin point to Camalig, Albay, but the municipality field names Legazpi City, Albay, 13 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":546},{"i":7949,"cid":"23HO0089","pid":"P00721891VS","t":"Construction of Road Dike at Brgy. Ylaya - Brgy. Libo-o, Ronda, Cebu","w":"Construction of Dike","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"AR ADLAWAN CONSTRUCTION","c":96497299.22,"abc":96497353.39,"fy":"2023","sd":"03/16/2023","cd":"2023-09-26","lat":9.986928,"lon":123.429123,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ylaya","len":null,"ph":null,"dup":[],"run":[],"cl":[7002,7701,7746,7799,7822,7872,7913],"L":"field","s":21,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.25,"value":8,"text":"8 separate contracts name Barangay Ylaya (2023 to 2024), totalling PHP 647,274,597.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1039},{"i":7950,"cid":"24FB0039","pid":"P00824780LZ","t":"Construction of Busay-Budiao Dike, Daraga, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"FEDERAL AGGREGATES AND DEVELOPMENT CORP.","c":24498721.87,"abc":24498876.83,"fy":"2024","sd":"03/20/2024","cd":"2024-07-22","lat":13.17259,"lon":123.694046,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6229},{"i":7951,"cid":"20F00106","pid":"P00448887LZ","t":"Rehabilitation/Reconstruction of Flood Control Structure along Managa-naga River, Bulan, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"Bulan","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / L BROS CONSTRUCTION AND SUPPLY INC (FORMERLY: L BROS. CONSTRUCTION & SUPPLY)","c":144749727.7,"abc":144749531.1,"fy":"2020","sd":"12/11/2020","cd":"2022-10-06","lat":12.6704,"lon":123.87704,"sm":250,"fm":null,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Managa-naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6230},{"i":7952,"cid":"24HD0030","pid":"P00820189VS","t":"Construction of Flood Control Structure at Tacup Bridge, San Remigio, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN REMIGIO (CEBU)","deo":"Cebu 4th District Engineering Office","co":"DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY)","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-09-03","lat":10.97676,"lon":123.93484,"sm":1355,"fm":1355,"tm":1355,"am":1355,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6231},{"i":7953,"cid":"20F00106","pid":"P00448887LZ","t":"Rehabilitation/Reconstruction of Flood Control Structure along Managa-naga River, Bulan, Sorsogon","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"SORSOGON","mu":"Bulan","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / L BROS CONSTRUCTION AND SUPPLY INC (FORMERLY: L BROS. CONSTRUCTION & SUPPLY)","c":144749727.7,"abc":144749531.1,"fy":"2021","sd":"12/11/2020","cd":"2022-10-06","lat":12.6704,"lon":123.87704,"sm":250,"fm":null,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Managa-naga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6232},{"i":7954,"cid":"23FA0035","pid":"P00727207LZ","t":"Construction of Vinisitahan Flood Control (Downstream) along Baclayon River, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":24500000.0,"abc":46059971.1,"fy":"2023","sd":"05/09/2023","cd":"2023-09-15","lat":13.283456,"lon":123.796573,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Baclayon","wn":"Baclayon River","wd":0.01,"wp":[13.28357,123.7965],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6233},{"i":7955,"cid":"22FO0105","pid":"P00640577LZ","t":"Construction of Flood Mitigation Structure, Barangay Quipia River, Jovellar, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"JOVELLAR (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":4949357.65,"abc":4950000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-01-21","lat":13.073623,"lon":123.601417,"sm":679,"fm":679,"tm":679,"am":679,"md":0.0,"ls":"inside","ww":"Barangay Quipia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Quipia River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6234},{"i":7956,"cid":"22KF0026","pid":"P00620151MN","t":"Construction of Slope Protection along Titunod Bridge I, Sta. 0+000.00 - Sta. 0+260.00, Kulambugan, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"KOLAMBUGAN (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"AL HUSSEIN CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-01-15","lat":8.102222,"lon":123.877222,"sm":715,"fm":715,"tm":715,"am":715,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":260.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6235},{"i":7957,"cid":"24FB0049","pid":"P00824775LZ","t":"Construction of Dike along Budiao - Busay, Daraga, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":19598426.97,"abc":19598901.03,"fy":"2024","sd":"03/25/2024","cd":"2024-07-24","lat":13.172051,"lon":123.694117,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6236},{"i":7958,"cid":"22FA0044","pid":"P00632943LZ","t":"Construction of River Control, Baclayon River, Barangay San Pedro - Barangay Vinisitahan Section, Bacacay, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":11880000.0,"abc":26728184.83,"fy":"2022","sd":"04/18/2022","cd":"2022-09-11","lat":13.27595,"lon":123.797,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Baclayon","wn":"Baclayon River","wd":0.02,"wp":[13.2758,123.79699],"wst":"matched","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6237},{"i":7959,"cid":"24F00295","pid":"P00820505LZ","t":"Construction of San Rafael River Control, San Rafael, Guinobatan, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"GUINOBATAN (ALBAY)","deo":"Albay 3rd District Engineering Office","co":"3DIAMONDS CONSTRUCTION CORPORATION","c":72374521.65,"abc":72374521.65,"fy":"2024","sd":"07/31/2024","cd":"2025-02-17","lat":13.197593,"lon":123.602014,"sm":603,"fm":603,"tm":603,"am":603,"md":0.0,"ls":"inside","ww":"San Rafael","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6238},{"i":7960,"cid":"23JB0029","pid":"P00721232MN","t":"Construction of Flood Control Structure, Ilaya Bridge, Abutment A, Upstream Section, Dapitan City, Zamboanga del Norte Sta.0+100 - Sta.0+438.40","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL NORTE","mu":"DAPITAN CITY (ZAMBOANGA DEL NORTE)","deo":"Zamboanga del Norte 1st District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":67547185.67,"abc":67550000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-02-01","lat":8.543007,"lon":123.429198,"sm":484,"fm":484,"tm":484,"am":484,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":338.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6239},{"i":7961,"cid":"22FA0029","pid":"P00631332LZ","t":"Rehabilitation of Brgy. 13 River Wall, Bacacay, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"JORMAND CONSTRUCTION & SUPPLY","c":24500000.0,"abc":24499215.53,"fy":"2022","sd":"03/11/2022","cd":"2022-09-04","lat":13.288326,"lon":123.797327,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"13 River Wall","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6240},{"i":7962,"cid":"24FB0011","pid":"P00839664LZ","t":"Construction of River Bank Protection Works and Drainage System, Barangay Kidaco to Barangay Lacag River, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"STEVEN CONSTRUCTION & SUPPLY","c":49498701.76,"abc":49498955.14,"fy":"2024","sd":"04/23/2024","cd":"2024-09-07","lat":13.149615,"lon":123.694465,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Barangay Lacag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Kidaco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6241},{"i":7963,"cid":"24FJ0025","pid":"P00821018LZ","t":"Construction of Flood Control Concrete Revetment, Segundo River, Barangay Madbad, Cawayan, Masbate","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"A3 CONSTRUCTION & SUPPLY","c":48848417.08,"abc":48871471.75,"fy":"2024","sd":"02/06/2024","cd":"2024-09-03","lat":11.983549,"lon":123.798252,"sm":361,"fm":1618,"tm":361,"am":361,"md":0.0,"ls":"inside","ww":"Segundo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Madbad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":24,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.77,"text":"The record contradicts itself: the title and the pin point to Cawayan, Masbate, but the municipality field names Uson, Masbate, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":547},{"i":7964,"cid":"23H00059","pid":"P00721885VS","t":"Construction of Flood Mitigation Structure along Tipolo River, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":173700000.0,"abc":173700000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-08-08","lat":10.327277,"lon":123.938983,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Tipolo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6242},{"i":7965,"cid":"22FJ0012","pid":"P00620748LZ","t":"Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate","w":"Construction of Revetment","rg":"Region V","pv":"MASBATE","mu":"USON (MASBATE)","deo":"Masbate 3rd District Engineering Office","co":"ALGIMAR CONSTRUCTION CORPORATION","c":35277048.57,"abc":35278715.81,"fy":"2022","sd":"02/14/2022","cd":"2022-08-30","lat":12.17403,"lon":123.79848,"sm":1618,"fm":1618,"tm":404,"am":1618,"md":0.0,"ls":"inside","ww":"Buenavista","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magsaysay Uson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":23,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":22.09,"text":"The record contradicts itself: the municipality field and the pin point to Uson, Masbate, but the title names City of Masbate, Masbate, 22 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":573},{"i":7966,"cid":"23HE0110","pid":"P00721763VS","t":"Construction of Lamacan River Flood Control Structure (Downstream), Sta. 0 + 000 - Sta. 0 + 230 (Leftside), Sta. 0 + 000 - Sta. 0 + 230 (Rightside), Sibonga, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SIBONGA (CEBU)","deo":"Cebu 1st District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":91674113.0,"abc":91675000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-21","lat":10.020522,"lon":123.605838,"sm":1444,"fm":1444,"tm":1444,"am":1444,"md":0.0,"ls":"inside","ww":"Lamacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":460.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6243},{"i":7967,"cid":"24HO0093","pid":"P00834588VS","t":"Construction of Revetment Wall at Barangay Libo-o - Barangay Tupas Phase 1, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":57896625.61,"abc":57896665.99,"fy":"2024","sd":"03/18/2024","cd":"2024-05-13","lat":9.989165,"lon":123.429372,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libo-o","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6244},{"i":7968,"cid":"23FB0127","pid":"P00742198LZ","t":"Construction of Flood Control Economic Road Dike and Drainage System Tributaries to Yawa River (Budiao-Misi) Package 4, Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":98998745.95,"abc":98998949.89,"fy":"2023","sd":"05/03/2023","cd":"2023-11-17","lat":13.18541,"lon":123.694543,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Yawa","wn":"Yawa River","wd":2.01,"wp":[13.16742,123.69697],"wst":"matched","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6245},{"i":7969,"cid":"22FA0067","pid":"P00639394LZ","t":"Construction of River Protection Structure along Salog River, Bacacay, Albay","w":"Construction of Slope Protection Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":95535000.0,"abc":95534998.71,"fy":"2022","sd":"06/03/2022","cd":"2023-01-29","lat":13.291707,"lon":123.798792,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":"Salog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6246},{"i":7970,"cid":"24JE0041","pid":"P00821074MN","t":"Construction of River Control Structure, Barangay Balangasan, Pagadian City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PAGADIAN CITY (CAPITAL) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":9789807.14,"abc":9800000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-01-08","lat":7.821494,"lon":123.430128,"sm":1054,"fm":1054,"tm":1054,"am":1054,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balangasan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6247},{"i":7971,"cid":"22FB0167","pid":"P00630969LZ","t":"Construction of Flood Control Structure Tributaries to Yawa River Budiao - Miisi Section, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"CBC CONSTRUCTION & SUPPLY / ALPHARD PRIMECON CONSTRUCTION","c":72373166.5,"abc":72373387.42,"fy":"2022","sd":"03/21/2022","cd":"2022-10-28","lat":13.18413,"lon":123.695006,"sm":485,"fm":485,"tm":null,"am":485,"md":0.0,"ls":"inside","ww":"Yawa","wn":"Yawa River","wd":1.86,"wp":[13.16742,123.69697],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6248},{"i":7972,"cid":"24H00082","pid":"P00834573VS","t":"Construction of Flood Control Structure along Jagobiao Creek, Phase 3, Barangay Casili to Barangay Sacsac, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":57893912.76,"abc":57900000.0,"fy":"2024","sd":"08/28/2024","cd":"2025-02-23","lat":10.37727,"lon":123.94034,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Jagobiao","wn":"Jagobiao Creek","wd":0.0,"wp":[10.37724,123.94033],"wst":"matched","br":"Casili","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6249},{"i":7973,"cid":"23FG0039","pid":"P00736103LZ","t":"Construction of Flood Control System of Mahaba Creek leading to Tambang River (Phase 2), Sitio Palayan, Brgy. Lamon, Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":95536200.0,"abc":95536200.0,"fy":"2023","sd":"02/26/2023","cd":"2024-04-01","lat":13.781294,"lon":123.430819,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Mahaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lamon","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6250},{"i":7974,"cid":"22FG0029","pid":"P00631425LZ","t":"Construction of Flood Mitigation Structure along Teres/Cagbalinad River, Garchitorena, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GARCHITORENA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/05/2022","cd":"2022-12-06","lat":13.847165,"lon":123.695544,"sm":566,"fm":566,"tm":566,"am":566,"md":0.0,"ls":"inside","ww":"Cagbalinad","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6251},{"i":7975,"cid":"22FG0010","pid":"P00631418LZ","t":"Construction of Flood Control System of Mahaba Creek leading to Tambang River, Sitio Palayan, Brgy. Lamon, Goa, Camarines Sur","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CAMARINES SUR","mu":"GOA (CAMARINES SUR)","deo":"Camarines Sur 4th District Engineering Office","co":"SPRING STAR CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-07-19","lat":13.780299,"lon":123.430953,"sm":590,"fm":590,"tm":590,"am":590,"md":0.0,"ls":"inside","ww":"Mahaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lamon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6252},{"i":7976,"cid":"22FB0148","pid":"P00630998LZ","t":"Rehabilitation of Revetment, Downstream of Budiao Spillway, Barangay Budiao, Daraga, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"MAKAPA CORPORATION","c":57898302.5,"abc":57898454.19,"fy":"2022","sd":"03/16/2022","cd":"2022-09-20","lat":13.182332,"lon":123.695658,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Budiao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Budiao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6253},{"i":7977,"cid":"22HO0073","pid":"P00620450VS","t":"Construction of of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Looc, Sta. 0 + 000 - Sta. 0 + 167.00, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":48999951.73,"abc":48999951.73,"fy":"2022","sd":"03/23/2022","cd":"2022-10-25","lat":10.05953,"lon":123.431022,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":167.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6254},{"i":7978,"cid":"22FB0014","pid":"P00621128LZ","t":"Construction of Cagsawa Ruins Protection Dike (Tributary ''E''), Daraga, Albay","w":"Construction of Dike","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION","c":72372927.18,"abc":72373310.95,"fy":"2022","sd":"03/04/2022","cd":"2022-10-25","lat":13.182537,"lon":123.695805,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6255},{"i":7979,"cid":"22HO0040","pid":"P00620039VS","t":"Construction of Looc-Poblacion Seawall, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":50174536.56,"abc":50174536.56,"fy":"2022","sd":"02/21/2022","cd":"2022-09-28","lat":10.059554,"lon":123.43115,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6256},{"i":7980,"cid":"22FA0044","pid":"P00632945LZ","t":"Rehabilitation of River Dike, Purok 2, Barangay Basud, Bacacay, Albay","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region V","pv":"ALBAY","mu":"BACACAY (ALBAY)","deo":"Albay 1st District Engineering Office","co":"8AR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":14850000.0,"abc":26728184.83,"fy":"2022","sd":"04/18/2022","cd":"2022-09-11","lat":13.268108,"lon":123.798884,"sm":88,"fm":88,"tm":88,"am":88,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Basud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6257},{"i":7981,"cid":"23FB0070","pid":"P00726968LZ","t":"Construction/Upgrading/Rehabilitation of Flood Mitigation System at Barangay Budiao to Barangay Busay River, Daraga, Albay","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"ALBAY","mu":"DARAGA (LOCSIN) (ALBAY)","deo":"Albay 2nd District Engineering Office","co":"NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION","c":72372955.14,"abc":72373502.03,"fy":"2023","sd":"04/04/2023","cd":"2023-11-02","lat":13.169146,"lon":123.696019,"sm":485,"fm":485,"tm":485,"am":485,"md":0.0,"ls":"inside","ww":"Barangay Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Budiao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6258},{"i":7982,"cid":"22FL0039","pid":"P00630965LZ","t":"Construction of Flood Control Structure along Barangay Calpi River, Bulan, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"BULAN (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.","c":56157105.99,"abc":57900000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-05","lat":12.752378,"lon":123.940969,"sm":250,"fm":250,"tm":250,"am":250,"md":0.0,"ls":"inside","ww":"Barangay Calpi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Calpi River","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6259},{"i":7983,"cid":"23HO0079","pid":"P00721907VS","t":"Construction of Bank Protection Structures along Brgy. Tupas - Brgy. Butong (Right Side Downstream), Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY)","c":72372872.6,"abc":72373238.72,"fy":"2023","sd":"03/16/2023","cd":"2023-07-10","lat":9.985331,"lon":123.431349,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7011,7055,7056,7064,7613,7918,7927,7992],"L":"field","s":22,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":1004},{"i":7984,"cid":"22HN0009","pid":"P00620131VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Polog, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"PHIL ASIA RESOURCES & DEVELOPMENT CORP. / WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":46279520.0,"abc":46279520.0,"fy":"2022","sd":"02/15/2022","cd":"2022-08-23","lat":10.409973,"lon":123.941139,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Polog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6260},{"i":7985,"cid":"23HO0016","pid":"P00731620VS","t":"Construction of Flood Wall Structures, Barangay Sorsogon - Barangay Salmeron (Right Side), Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96014076.83,"abc":96015747.66,"fy":"2023","sd":"02/08/2023","cd":"2023-12-18","lat":9.984363,"lon":123.431506,"sm":887,"fm":887,"tm":887,"am":1214,"md":31.81,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sorsogon","len":null,"ph":null,"dup":[7987,7988,7989],"run":[],"cl":[],"L":"records","s":74,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":31.81,"text":"The pin is 31.8 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 308,313,976.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":38},{"i":7986,"cid":"23HH0097","pid":"P00721787VS","t":"Construction of Flood Mitigation Structure along Mananga River, Barangay Buot-Taup, Cebu City","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CEBU CITY (CAPITAL) (CEBU)","deo":"Cebu City District Engineering Office","co":"A.S.T BUILDERS / TRI4 CONSTRUCTION & DEVELOPMENT CORP.","c":86704127.07,"abc":86850000.0,"fy":"2023","sd":"06/20/2023","cd":"2024-03-28","lat":10.341526,"lon":123.799081,"sm":362,"fm":362,"tm":362,"am":362,"md":0.0,"ls":"inside","ww":"Mananga","wn":"Mananga River","wd":0.14,"wp":[10.34087,123.80014],"wst":"matched","br":"Buot-Taup","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6261},{"i":7987,"cid":"23HO0034","pid":"P00732013VS","t":"Construction of Flood Control Structures, Sitio Parale - Sitio Dao (Upstream), Barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96498218.47,"abc":96498219.65,"fy":"2023","sd":"02/08/2023","cd":"2023-12-19","lat":9.984363,"lon":123.431506,"sm":887,"fm":887,"tm":887,"am":1214,"md":31.81,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[7985,7988,7989],"run":[],"cl":[],"L":"records","s":75,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":31.81,"text":"The pin is 31.8 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 308,313,976.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":34},{"i":7988,"cid":"23HO0035","pid":"P00732012VS","t":"Construction of Flood Control Structures, Sitio Sulok-Sitio Dao (Right Side Upstream), Barangay Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QM BUILDERS","c":96498180.8,"abc":96498241.6,"fy":"2023","sd":"02/08/2023","cd":"2023-08-15","lat":9.984363,"lon":123.431506,"sm":887,"fm":887,"tm":887,"am":1214,"md":31.81,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[7985,7987,7989],"run":[],"cl":[],"L":"records","s":75,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":31.81,"text":"The pin is 31.8 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 308,313,976.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":35},{"i":7989,"cid":"23HO0172","pid":"P00733742VS","t":"Construction of Flood Wall Structures at Sitio Aransana - Sitio Sulok (Right Side Upstream), Brgy. Mindanao, Malabuyoc, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MALABUYOC (CEBU)","deo":"Cebu 7th District Engineering Office","co":"QG DEVELOPMENT CORPORATION","c":19303500.0,"abc":19597462.26,"fy":"2023","sd":"04/11/2023","cd":"2023-10-07","lat":9.984363,"lon":123.431506,"sm":887,"fm":887,"tm":887,"am":1214,"md":31.81,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mindanao","len":null,"ph":null,"dup":[7985,7987,7988],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":31.81,"text":"The pin is 31.8 km outside Malabuyoc, Cebu, the nearest municipality the record claims. It falls in Ronda, Cebu.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.55,"value":3,"text":"3 other contract(s) with different titles use this exact pin, 3 of them funded in the same year. Combined value at this pin: PHP 308,313,976.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":139},{"i":7990,"cid":"22HN0071","pid":"P00632986VS","t":"Construction of Slope Protection along Garing Road, Brgy. Garing, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":53075000.0,"abc":53075000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-10-03","lat":10.422248,"lon":123.941673,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Garing","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6262},{"i":7991,"cid":"22JE0051","pid":"P00630567MN","t":"Construction of River Control, Barangay Sta. Lucia, Pagadian City, Zamboanga del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region IX","pv":"ZAMBOANGA DEL SUR","mu":"PAGADIAN CITY (CAPITAL) (ZAMBOANGA DEL SUR)","deo":"Zamboanga del Sur 1st District Engineering Office","co":"GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS)","c":7332475.49,"abc":7350000.0,"fy":"2022","sd":"07/19/2022","cd":"2023-09-05","lat":7.818689,"lon":123.431903,"sm":1054,"fm":1054,"tm":1054,"am":1054,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Lucia","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6263},{"i":7992,"cid":"23HO0137","pid":"P00733251VS","t":"Construction of Riverbank Protection along Talaba River (Sitio Upper Talayong - Sitio Cansibog), Barangay Tupas, Ronda, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"RONDA (CEBU)","deo":"Cebu 7th District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96497256.46,"abc":96497447.87,"fy":"2023","sd":"04/11/2023","cd":"2023-12-18","lat":9.982034,"lon":123.43199,"sm":1214,"fm":1214,"tm":1214,"am":1214,"md":0.0,"ls":"inside","ww":"Talaba","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tupas","len":null,"ph":null,"dup":[],"run":[],"cl":[7006,7011,7055,7056,7064,7613,7918,7927,7983],"L":"field","s":24,"sig":[{"code":"barangay_concentration","group":"risk","strength":0.29,"value":10,"text":"10 separate contracts name Barangay Tupas (2023 to 2024), totalling PHP 862,776,455.","benign":"Barangays on major rivers can need many phased works over several years."}],"rk":936},{"i":7993,"cid":"23HN0094","pid":"P00733287VS","t":"Construction of Slope Protection Structure along Garing-Panas Road, Phase II, Consolacion, Cebu","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":96410000.0,"abc":96500000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-11-20","lat":10.425654,"lon":123.942349,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6264},{"i":7994,"cid":"24HO0028","pid":"P00820194VS","t":"Construction of Dumanjug CIS Drainage System, Dumanjug, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"DUMANJUG (CEBU)","deo":"Cebu 7th District Engineering Office","co":"ADAMANT DEVELOPMENT CORPORATION","c":4898131.85,"abc":4898203.72,"fy":"2024","sd":"02/16/2024","cd":"2024-05-26","lat":10.049295,"lon":123.432001,"sm":539,"fm":539,"tm":539,"am":539,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6265},{"i":7995,"cid":"24HN0072","pid":"P00820054VS","t":"Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili to Barangay Sacsac, Phase II, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":144699797.6,"abc":144750000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-10-28","lat":10.371373,"lon":123.942593,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Jagobiao","wn":"Jagobiao Creek","wd":0.0,"wp":[10.37137,123.94257],"wst":"matched","br":"Casili","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6266},{"i":7996,"cid":"24KF0052","pid":"P00836182MN","t":"Construction of Flood Control Structure, Brgy. Big Banisilon, Tangcal, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TANGCAL (LANAO DEL NORTE)","deo":"Lanao del Norte 2nd District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":4841201.0,"abc":4894060.53,"fy":"2024","sd":"07/15/2024","cd":"2025-02-03","lat":8.042698,"lon":123.944019,"sm":1544,"fm":1544,"tm":1544,"am":1544,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Big Banisilon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6267},{"i":7997,"cid":"23H00057","pid":"P00721883VS","t":"Construction of Flood Mitigation Structure along Butuanon River (Upstream - Phase 2), Barangay Maguikay, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":115600000.0,"abc":115800000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-05-08","lat":10.342197,"lon":123.944322,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34226,123.94431],"wst":"matched","br":"Maguikay","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6268},{"i":7998,"cid":"23HN0113","pid":"P00733266VS","t":"Construction of Flood Control Structure along Butuanon River (Phase IX) Upstream, Brgy. Tabok, Mandaue City, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"MANDAUE CITY (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION)","c":96399888.0,"abc":96500000.0,"fy":"2023","sd":"05/12/2023","cd":"2024-02-13","lat":10.34245,"lon":123.945209,"sm":915,"fm":915,"tm":915,"am":915,"md":0.0,"ls":"inside","ww":"Butuanon","wn":"Butuanon River","wd":0.01,"wp":[10.34257,123.9452],"wst":"matched","br":"Tabok","len":null,"ph":"Phase IX","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6269},{"i":7999,"cid":"23HN0093","pid":"P00721979VS","t":"Construction of Flood Control Structure along Cansaga River, Barangay Polog, Phase II, Consolacion, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"CONSOLACION (CEBU)","deo":"Cebu 6th District Engineering Office","co":"QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) / ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-11-27","lat":10.405235,"lon":123.945979,"sm":453,"fm":453,"tm":453,"am":453,"md":0.0,"ls":"inside","ww":"Cansaga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Polog","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6270},{"i":8000,"cid":"23I00062","pid":"P00733321VS","t":"Construction of Flood Control Structure along Tarusan Creek, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY)","c":48248733.47,"abc":48249234.49,"fy":"2023","sd":"07/05/2023","cd":"2024-04-05","lat":10.741833,"lon":125.009444,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":"Tarusan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6271},{"i":8001,"cid":"22K00190","pid":"P00620214MN","t":"Construction of Flood Control Structure at Tagoloan River (Natumolan Section), Sta. 0+000.00 - Sta. 0+235.00, Package 6, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ME 3 CONSTRUCTION","c":83793901.28,"abc":86850000.0,"fy":"2022","sd":"07/15/2022","cd":"2023-11-01","lat":8.535207,"lon":124.775381,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.06,"wp":[8.53571,124.77561],"wst":"matched","br":null,"len":235.0,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6272},{"i":8002,"cid":"23IF0044","pid":"P00721555VS","t":"Construction of Lonoy Flood Control, Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":96499999.89,"abc":96500000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-29","lat":11.202872,"lon":124.566031,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6273},{"i":8003,"cid":"23K00054","pid":"P00721267MN","t":"Construction of Revetment along Alae River, Package 1, Cagayan de Oro City","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"RAMISES CONSTRUCTION","c":89377158.78,"abc":91675000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-06-26","lat":8.512193,"lon":124.775554,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.02,"wp":[8.51232,124.77567],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6274},{"i":8004,"cid":"24KB0179","pid":"P00836176MN","t":"Construction of Drainage Structure, Purok 10, Barangay South Poblacion, Maramag, Bukidnon","w":"Construction of Drainage Structure","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"CAAB DEVELOPMENT CORP.","c":4933284.23,"abc":4950000.0,"fy":"2024","sd":"06/10/2024","cd":"2024-11-21","lat":7.747955,"lon":125.009863,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"South Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6275},{"i":8005,"cid":"22IA0020","pid":"P00630668VS","t":"Construction of Seawall, Barangay Burabod, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC.","c":4947824.24,"abc":4947820.11,"fy":"2022","sd":"03/15/2022","cd":"2022-07-20","lat":11.477479,"lon":124.455618,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Burabod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6276},{"i":8006,"cid":"23MG0032","pid":"P00732163MN","t":"Construction of Bank Protection Structure along Bolok Creek, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS","c":34299901.86,"abc":34300000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-11-15","lat":6.503216,"lon":124.843857,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Bolok","wn":"B'lok Creek","wd":0.01,"wp":[6.50325,124.84381],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6277},{"i":8007,"cid":"22KF0050","pid":"P00620147MN","t":"Construction of Slope Protection along Mago-ong Bridge, Upstream (RS), Linamon, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LINAMON (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LANAO BUILDER AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-09-12","lat":8.184588,"lon":124.1563,"sm":795,"fm":795,"tm":795,"am":795,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6278},{"i":8008,"cid":"22IG0085","pid":"P00644763VS","t":"Emergency/Repair/Rehabilitation/Improvement of Flood Control, Brgy. Lunang, Hilongos, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"HILONGOS (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"DC BROS BUILDERS AND TRADING","c":24064687.5,"abc":24125000.0,"fy":"2022","sd":"01/12/2023","cd":"2023-07-10","lat":10.35085,"lon":124.77675,"sm":617,"fm":617,"tm":617,"am":617,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lunang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6279},{"i":8009,"cid":"22ID0019","pid":"P00620186VS","t":"Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Cabayongan River Basin, Jaro, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"JARO (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY)","c":48586389.57,"abc":48586422.81,"fy":"2022","sd":"02/21/2022","cd":"2022-12-20","lat":11.184347,"lon":124.77734,"sm":664,"fm":664,"tm":664,"am":664,"md":0.0,"ls":"inside","ww":"Cabayongan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6280},{"i":8010,"cid":"22KE0003","pid":"P00620137MN","t":"Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JAPUZ-JANSOL ENTERPRISES","c":49000000.0,"abc":48999959.2,"fy":"2022","sd":"02/15/2022","cd":"2023-02-03","lat":9.198266,"lon":124.779088,"sm":907,"fm":907,"tm":907,"am":878,"md":0.0,"ls":"inside","ww":"Tupsan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6281},{"i":8011,"cid":"23IJ0037","pid":"P00721805VS","t":"Construction of Flood Control Structure along Gandara River, Barangay San Pelayo, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JUPA CONSTRUCTION","c":52970012.17,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-11-25","lat":11.996757,"lon":124.782284,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.08,"wp":[11.99637,124.7829],"wst":"matched","br":"San Pelayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6282},{"i":8012,"cid":"22K00351","pid":"P00620350MN","t":"Construction of Flood Control Structures at Tagoloan River (Mohon Section), Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":47276009.03,"abc":48250000.0,"fy":"2022","sd":"11/07/2022","cd":"2023-08-21","lat":8.536536,"lon":124.7826,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.05,"wp":[8.53607,124.78257],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6283},{"i":8013,"cid":"23KK0013","pid":"P00721639MN","t":"Construction of Flood Control Structure along Balatukan River, Barangay Mambayaan, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-10-16","lat":8.77246,"lon":124.782713,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan River","wd":0.02,"wp":[8.77259,124.78278],"wst":"matched","br":"Mambayaan","len":null,"ph":null,"dup":[8014],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 168,875,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":695},{"i":8014,"cid":"23KK0079","pid":"P00721557MN","t":"Construction of Flood Control along Balatukan River, Barangay Mambayaan, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"DICON BUILDERS CORP.","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2024-01-10","lat":8.77246,"lon":124.782713,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan River","wd":0.02,"wp":[8.77259,124.78278],"wst":"matched","br":"Mambayaan","len":null,"ph":null,"dup":[8013],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 168,875,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":857},{"i":8015,"cid":"23MG0010","pid":"P00721509MN","t":"Construction of River Bank Protection along Banga River, Barangay Puti, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE)","c":34299868.03,"abc":34300000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-10-10","lat":6.513333,"lon":124.698056,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.06,"wp":[6.51371,124.69847],"wst":"matched","br":"Puti","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6284},{"i":8016,"cid":"23IM0068","pid":"P00721918VS","t":"Construction of Flood Control Structure, Phase 3, Camansihay, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JELM CONSTRUCTION CORP.","c":96096604.9,"abc":96497447.02,"fy":"2023","sd":"05/23/2023","cd":"2024-02-15","lat":11.302953,"lon":124.941549,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6285},{"i":8017,"cid":"22K00210","pid":"P00620040MN","t":"Construction of Mala-Lawasaig River Flood Control with Steel Sheet Pile and Slope Protection, Brgy. Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"DITSAAN-RAMAIN (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.","c":121686414.2,"abc":125450000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-12-23","lat":7.984911,"lon":124.343734,"sm":521,"fm":521,"tm":521,"am":521,"md":0.0,"ls":"inside","ww":"Mala-Lawasaig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lilod Baclayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6286},{"i":8018,"cid":"23M00073","pid":"P00721467MN","t":"Construction of River Bank Protection along Ala River, Santo Niño, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SANTO NIÑO (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":106149850.6,"abc":106150000.0,"fy":"2023","sd":"09/19/2023","cd":"2024-10-07","lat":6.473611,"lon":124.620278,"sm":1414,"fm":1414,"tm":1414,"am":1414,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6287},{"i":8019,"cid":"22IF0084","pid":"P00620190VS","t":"Construction of Canawagan Flood Control (Upstream), Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":144750000.0,"abc":144750000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-12-19","lat":11.187122,"lon":124.566241,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6288},{"i":8020,"cid":"24ID0039","pid":"P00832681VS","t":"Construction of Flood Control Structure, Barangay 1, Jaro, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"JARO (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"IVS BUILDERS","c":4862639.81,"abc":4899384.7,"fy":"2024","sd":"03/15/2024","cd":"2024-09-14","lat":11.187291,"lon":124.782817,"sm":664,"fm":664,"tm":664,"am":664,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6289},{"i":8021,"cid":"23IC0035","pid":"P00721708VS","t":"Construction of Shoreline Protection, Brgy. Mawodpawod, San Miguel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN MIGUEL (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LANOY CONSTRUCTION","c":48949999.55,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-07-10","lat":11.365079,"lon":124.783,"sm":1334,"fm":1334,"tm":1334,"am":1334,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mawodpawod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6290},{"i":8022,"cid":"23KK0076","pid":"P00721554MN","t":"Construction of Flood Control along Balatukan River (Upstream), Barangay Mandangoa, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUALYZ TRADING","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-09-06","lat":8.767929,"lon":124.78335,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan RIver","wd":0.15,"wp":[8.76905,124.7841],"wst":"matched","br":"Mandangoa","len":null,"ph":null,"dup":[8023],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 144,750,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":620},{"i":8023,"cid":"23KK0077","pid":"P00721555MN","t":"Construction of Flood Control along Balatukan River (Downstream), Barangay Mandangoa, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUALYZ TRADING","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-09-06","lat":8.767929,"lon":124.78335,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan RIver","wd":0.15,"wp":[8.76905,124.7841],"wst":"matched","br":"Mandangoa","len":null,"ph":null,"dup":[8022],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 144,750,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":621},{"i":8024,"cid":"23IJ0002","pid":"P00721982VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Casab-ahan (Phase II), Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":53045950.9,"abc":53075000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-09-18","lat":11.999927,"lon":124.783415,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.13,"wp":[11.99951,124.78455],"wst":"matched","br":"Casab-ahan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6291},{"i":8025,"cid":"22KE0001","pid":"P00620130MN","t":"Construction of Hubangon I River Control, Hubangon I, K 12.11 + 162.50 - K 12.11 + 517, Mahinog, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAHINOG (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"CLC CONSTRUCTION SERVICES AND SUPPLY","c":28021001.32,"abc":29399963.46,"fy":"2022","sd":"02/09/2022","cd":"2022-09-15","lat":9.176298,"lon":124.783473,"sm":878,"fm":878,"tm":878,"am":878,"md":0.0,"ls":"inside","ww":"Hubangon I","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6292},{"i":8026,"cid":"23KK0071","pid":"P00721538MN","t":"Construction of Revetment at Napaliran Bridge (Abutment A and B), Balingasag, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"06/15/2023","cd":"2023-12-11","lat":8.77854,"lon":124.784519,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6293},{"i":8027,"cid":"22KE0059","pid":"P00634132MN","t":"Construction of Drainage Canal, Barangay Hubangon, Mahinog, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAHINOG (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"FNTC CONSTRUCTION","c":4939885.65,"abc":4949999.17,"fy":"2022","sd":"04/11/2022","cd":"2022-08-16","lat":9.173991,"lon":124.784551,"sm":878,"fm":878,"tm":878,"am":878,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hubangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6294},{"i":8028,"cid":"23KK0104","pid":"P00733987MN","t":"Construction of Revetment at Binuangan Bridge (Abutment A & B), Binuangan, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BINUANGAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/23/2023","cd":"2024-03-08","lat":8.917687,"lon":124.785912,"sm":212,"fm":212,"tm":212,"am":212,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6295},{"i":8029,"cid":"22K00194","pid":"P00630494MN","t":"Construction of Flood Mitigation Structure along Tagoloan River, Package 1, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":65157953.24,"abc":67550000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-10-09","lat":8.534774,"lon":124.786126,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.08,"wp":[8.5343,124.78563],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6296},{"i":8030,"cid":"23ID0058","pid":"P00721574VS","t":"Construction of Cabayongan Flood Control Structure and Drainage system, Cabayongan River Basin, Jaro, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"JARO (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":54655168.88,"abc":55487451.22,"fy":"2023","sd":"04/27/2023","cd":"2023-12-18","lat":11.188514,"lon":124.786285,"sm":664,"fm":664,"tm":664,"am":664,"md":0.0,"ls":"inside","ww":"Cabayongan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6297},{"i":8031,"cid":"22K00193","pid":"P00634957MN","t":"Construction of Flood Mitigation Structure along Pugaan River, Package 2, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":65499177.15,"abc":67550000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-24","lat":8.534282,"lon":124.786879,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.04,"wp":[8.53394,124.78686],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6298},{"i":8032,"cid":"24IG0085","pid":"P00834684VS","t":"Construction of Ugayon Flood Control Structure, Bato, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BATO (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":48265131.9,"abc":49000000.0,"fy":"2024","sd":"05/20/2024","cd":"2024-12-11","lat":10.329985,"lon":124.787568,"sm":184,"fm":184,"tm":184,"am":184,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6299},{"i":8033,"cid":"22K00192","pid":"P00634956MN","t":"Construction of Flood Mitigation Structure along Pugaan River, Package 1, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":65170004.82,"abc":67550000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-24","lat":8.533545,"lon":124.787617,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.04,"wp":[8.5339,124.78764],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[8034],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 130,323,257.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":858},{"i":8034,"cid":"22K00195","pid":"P00630495MN","t":"Construction of Flood Mitigation Structure along Tagoloan River, Package 2, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":65153251.9,"abc":67550000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-24","lat":8.533544,"lon":124.787617,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.14,"wp":[8.53306,124.78649],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[8033],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 130,323,257.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":859},{"i":8035,"cid":"23M00158","pid":"P00721457MN","t":"Construction of Lumayong Flood Control Project (Downstream of Carmen Bridge, Kayaga to Sitio Punol, Phase III) along Pulangi River, Kabacan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":72167177.4,"abc":72375000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-12-29","lat":7.130617,"lon":124.787783,"sm":682,"fm":682,"tm":682,"am":1055,"md":0.03,"ls":"boundary","ww":"Pulangi","wn":"Pulangi River","wd":2.06,"wp":[7.14229,124.80235],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6300},{"i":8036,"cid":"23K00056","pid":"P00721416MN","t":"Construction of Flood Control Structure at Tagoloan River, Package 7, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY / TRIPARCO DEVELOPMENT CORPORATION","c":279359677.5,"abc":289500000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-05-26","lat":8.53269,"lon":124.787803,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.12,"wp":[8.53227,124.78683],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6301},{"i":8037,"cid":"24KL0011","pid":"P00820266MN","t":"Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-09-25","lat":8.53254,"lon":124.787882,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.15,"wp":[8.53389,124.7878],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8039,8040],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24KL0010 to 24KL0012) cover the same site, together worth PHP 289,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":228},{"i":8038,"cid":"23IG0022","pid":"P00721583VS","t":"Construction of Pangasugan Flood Control structure, Barangay Pangasugan, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":52588254.57,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-12-15","lat":10.749864,"lon":124.788009,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pangasugan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6302},{"i":8039,"cid":"24KL0010","pid":"P00820274MN","t":"Construction of Flood Control Structure along Right Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-11-25","lat":8.53456,"lon":124.788163,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.07,"wp":[8.53392,124.7882],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[8037,8040],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24KL0010 to 24KL0012) cover the same site, together worth PHP 289,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":229},{"i":8040,"cid":"24KL0012","pid":"P00820265MN","t":"Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"CAGALAWAN ENTERPRISES / SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-11-25","lat":8.533633,"lon":124.788872,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.04,"wp":[8.53399,124.78882],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[8039,8037],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24KL0010 to 24KL0012) cover the same site, together worth PHP 289,500,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":230},{"i":8041,"cid":"21KK0121","pid":"P00550572MN","t":"Construction of Flood Control Structures along Balatukan River (Phase 1), Barangay Napaliran, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Balingasag","deo":"Misamis Oriental 1st District Engineering Office","co":"ONE NINE ONE TRADING","c":19795000.0,"abc":19600000.0,"fy":"2021","sd":"07/05/2022","cd":"2022-12-01","lat":8.769468,"lon":124.789685,"sm":134,"fm":null,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan River","wd":0.0,"wp":[8.76946,124.78969],"wst":"matched","br":"Napaliran","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00995,"text":"Contract cost is 0.99% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":937},{"i":8042,"cid":"24ID0065","pid":"P00820360VS","t":"Construction of Binahaan Flood Control Structure, Binahaan River Basin, Barangay San Agustin, Jaro, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"JARO (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":67530749.5,"abc":67549448.75,"fy":"2024","sd":"03/13/2024","cd":"2024-11-25","lat":11.118206,"lon":124.790035,"sm":664,"fm":664,"tm":664,"am":664,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":1.95,"wp":[11.11121,124.80641],"wst":"matched","br":"San Agustin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6303},{"i":8043,"cid":"23K00057","pid":"P00721417MN","t":"Construction of Flood Control Structure at Tagoloan River, Package 8, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY / TRIPARCO DEVELOPMENT CORPORATION","c":280801925.4,"abc":289500000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-07-20","lat":8.529832,"lon":124.79016,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.07,"wp":[8.52933,124.78979],"wst":"matched","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6304},{"i":8044,"cid":"22MI0023","pid":"P00620280MN","t":"Construction of Revetment, Lumayong Flood Control Project (Downstream of Carmen Bridge, Kayaga to Sitio Punol, Phase II) along Pulangi River, Kabacan, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":48999638.16,"abc":48250000.0,"fy":"2022","sd":"02/23/2022","cd":"2023-05-06","lat":7.122118,"lon":124.790278,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":2.6,"wp":[7.14229,124.80235],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01554,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":696},{"i":8045,"cid":"24KK0061","pid":"P00835876MN","t":"Construction of Flood Control Structure (Downstream of Cabulawan Bridge), Lagonglong, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LAGONGLONG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"05/27/2024","cd":"2025-03-25","lat":8.813225,"lon":124.791107,"sm":735,"fm":735,"tm":735,"am":735,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6305},{"i":8046,"cid":"23KK0078","pid":"P00721556MN","t":"Construction of Flood Control along Balatukan River, Barangay Napaliran, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / CHIU BUILDERS","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-11-28","lat":8.769745,"lon":124.791943,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan River","wd":0.01,"wp":[8.76967,124.79194],"wst":"matched","br":"Napaliran","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6306},{"i":8047,"cid":"23KE0015","pid":"P00732485MN","t":"Rehabilitation of Drainage System, Barangay Benoni, Mahinog, Camiguin","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAHINOG (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"CLC CONSTRUCTION SERVICES AND SUPPLY","c":6322322.11,"abc":6369999.51,"fy":"2023","sd":"02/10/2023","cd":"2023-12-18","lat":9.138832,"lon":124.792549,"sm":878,"fm":878,"tm":878,"am":878,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Benoni","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6307},{"i":8048,"cid":"23K00137","pid":"P00721419MN","t":"Construction of Flood Control Structure at Tagoloan River, Package 10, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"HAPPY ALL3 BUILDERS CORPORATION / EQUI-PARCO CONSTRUCTION COMPANY","c":266231274.7,"abc":274500000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-08-31","lat":8.527385,"lon":124.79321,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.11,"wp":[8.52705,124.79224],"wst":"matched","br":null,"len":null,"ph":"Package 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6308},{"i":8049,"cid":"24MI0062","pid":"P00820095MN","t":"Construction of Flood Mitigation Structure, Downstream of Tacupan Bridge, Tacupan, Carmen, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"CARMEN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":96345472.96,"abc":96500000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-12-09","lat":7.215358,"lon":124.794557,"sm":340,"fm":340,"tm":340,"am":340,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6309},{"i":8050,"cid":"23KL0074","pid":"P00721544MN","t":"Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2024-01-26","lat":8.536283,"lon":124.795683,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.04,"wp":[8.53663,124.79553],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6310},{"i":8051,"cid":"24IJ0018","pid":"P00820420VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Buñagan, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"ETAN CONSTRUCTION","c":29370339.61,"abc":29400000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-10-15","lat":12.01534,"lon":124.795824,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.08,"wp":[12.01473,124.7962],"wst":"matched","br":"Buñagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6311},{"i":8052,"cid":"22IG0014","pid":"P00620336VS","t":"Construction of Dungca-an Flood Control Structure, (Mouth Section Baybay Side), Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48402432.51,"abc":49000000.0,"fy":"2022","sd":"02/23/2022","cd":"2023-02-05","lat":10.686061,"lon":124.796005,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6312},{"i":8053,"cid":"21MI0052","pid":"P00522328MN","t":"Kabacan Flood Control Dike Phase II along Brgy. Magatos, Kilagasan and Cuyapon, Kabacan, North Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"Kabacan","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":43424992.69,"abc":44100000.0,"fy":"2021","sd":"03/29/2021","cd":"2022-09-03","lat":7.07839,"lon":124.796125,"sm":682,"fm":null,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magatos","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6313},{"i":8054,"cid":"24KL0065","pid":"P00835764MN","t":"Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 2, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-11-19","lat":8.537459,"lon":124.796364,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.05,"wp":[8.53778,124.79609],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6314},{"i":8055,"cid":"23KE0051","pid":"P00734388MN","t":"Construction of Benoni Seawall including Wave Breaker, Mahinog, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAHINOG (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":47521019.29,"abc":48999999.78,"fy":"2023","sd":"04/20/2023","cd":"2024-09-29","lat":9.147985,"lon":124.797049,"sm":878,"fm":878,"tm":878,"am":878,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6315},{"i":8056,"cid":"23IC0036","pid":"P00721709VS","t":"Construction of Shoreline Protection, Brgy. Malpag, San Miguel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN MIGUEL (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / VHITS D. G. BUILDERS & ENTERPRISES","c":48936924.37,"abc":49000000.0,"fy":"2023","sd":"05/24/2023","cd":"2023-11-11","lat":11.376447,"lon":124.797542,"sm":1334,"fm":1334,"tm":1334,"am":1334,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malpag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6316},{"i":8057,"cid":"24KL0066","pid":"P00820896MN","t":"Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 3, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-11-25","lat":8.538306,"lon":124.798013,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Pugaan","wn":"Pugaan River","wd":0.02,"wp":[8.53851,124.79802],"wst":"matched","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6317},{"i":8058,"cid":"22MG0012","pid":"P00630620MN","t":"Construction of River Bank Protection along Safali River, Brgy. Naci, Surallah, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SURALLAH (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION / GABRIELLAS ENTERPRISES","c":44071697.8,"abc":44100000.0,"fy":"2022","sd":"03/09/2022","cd":"2022-07-20","lat":6.349167,"lon":124.799722,"sm":1496,"fm":1496,"tm":1496,"am":1496,"md":0.0,"ls":"inside","ww":"Safali","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Naci","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6318},{"i":8059,"cid":"23MG0015","pid":"P00732096MN","t":"Construction of River Bank Protection along Safali River, Brgy. Naci, Surallah, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SURALLAH (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS","c":28899987.85,"abc":28950000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-11-07","lat":6.344946,"lon":124.799968,"sm":1496,"fm":1496,"tm":1496,"am":1496,"md":0.0,"ls":"inside","ww":"Safali","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Naci","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6319},{"i":8060,"cid":"23MG0030","pid":"P00721510MN","t":"Construction of River Bank Protection along Banga River, Barangay Rang-ay, Banga, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"BANGA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ALEXANDER BUILDERS","c":27439788.25,"abc":27440000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-29","lat":6.398346,"lon":124.800638,"sm":148,"fm":148,"tm":148,"am":148,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.05,"wp":[6.398,124.8003],"wst":"matched","br":"Rang-ay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6320},{"i":8061,"cid":"23M00151","pid":"P00721298MN","t":"Construction of Kabacan Flood Control Dike Phase III along Barangay Magatos, Kilagasan and Cuyapon, Kabacan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MUST ENTERPRISES / BORDERLINE CONSTRUCTION & SUPPLY","c":92638620.31,"abc":92640000.0,"fy":"2023","sd":"09/01/2023","cd":"2024-12-23","lat":7.071999,"lon":124.802003,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magatos","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6321},{"i":8062,"cid":"23IG0064","pid":"P00721969VS","t":"Construction of Flood Control, Barangay San Isidro, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"MERMIT CONSTRUCTION AND ENTERPRISES","c":5756520.0,"abc":5880000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-08-02","lat":10.703755,"lon":124.804735,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6322},{"i":8063,"cid":"22IG0009","pid":"P00620201VS","t":"Construction of Hipusngo Flood Control Structure, Brgy. Hipusngo, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48436562.67,"abc":49000000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-11-30","lat":10.664945,"lon":124.805544,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hipusngo","len":null,"ph":null,"dup":[8064],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 100,845,335.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1107},{"i":8064,"cid":"23IG0034","pid":"P00721582VS","t":"Construction of Hipusngo Flood Control Structure, Barangay Hipusngo, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":52408772.55,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-12-05","lat":10.664945,"lon":124.805544,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hipusngo","len":null,"ph":null,"dup":[8063],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 100,845,335.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1092},{"i":8065,"cid":"22MI0010","pid":"P00620282MN","t":"Construction of Revetment, Kabacan River Bank Protection (Upstream of Lumayong Bridge), Kabacan, North Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":48999996.61,"abc":48250000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-19","lat":7.141199,"lon":124.805843,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.14147,124.80605],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.43,"value":1.01554,"text":"Contract cost is 1.55% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":697},{"i":8066,"cid":"23KK0105","pid":"P00733988MN","t":"Construction of Revetment at Buko Bridge (Abutment A & B), Kinoguitan, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"KINOGUITAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/23/2023","cd":"2024-01-30","lat":8.995127,"lon":124.808447,"sm":712,"fm":712,"tm":712,"am":712,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6323},{"i":8067,"cid":"22IC0074","pid":"P00632039VS","t":"Construction of Flood Control along Mainit River, Brgy. Capilihan, San Miguel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN MIGUEL (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JGO BUILDERS","c":49004805.5,"abc":49500000.0,"fy":"2022","sd":"06/01/2022","cd":"2023-04-21","lat":11.356285,"lon":124.809962,"sm":1334,"fm":1334,"tm":1334,"am":1334,"md":0.0,"ls":"inside","ww":"Mainit","wn":"Mainit River","wd":7.57,"wp":[11.30499,124.85587],"wst":"matched","br":"Capilihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.57,"text":"The title names Mainit, which OpenStreetMap maps through the stated municipality, but the pin is 7.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":305},{"i":8068,"cid":"22IJ0090","pid":"P00644607VS","t":"Rehabilitation of Flood Control Structure along Gandara River, Brgy. Burabod II, Gandara, Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":28728643.57,"abc":28950000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-11-11","lat":12.0203,"lon":124.8109,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.13,"wp":[12.01995,124.81201],"wst":"matched","br":"Burabod II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6324},{"i":8069,"cid":"24IG0076","pid":"P00834683VS","t":"Construction of Hipusngo Flood Control Structure, Barangay Hipusngo, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":48476248.01,"abc":49000000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-12-06","lat":10.66343,"lon":124.810925,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hipusngo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6325},{"i":8070,"cid":"24IJ0063","pid":"P00835023VS","t":"Construction of Drainage Structure Gandara II Central Elementary School Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"5GG CONSTRUCTION (FORMERLY: 5G GALVEZ CONSTRUCTION AND SUPPLY)","c":7887413.96,"abc":7920000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-10-28","lat":12.013733,"lon":124.811063,"sm":565,"fm":565,"tm":null,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6326},{"i":8071,"cid":"23IG0068","pid":"P00733294VS","t":"Construction of Sewerage Treatment Facility, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":80786514.33,"abc":82025000.0,"fy":"2023","sd":"05/31/2023","cd":"2023-11-06","lat":10.668012,"lon":124.81146,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6327},{"i":8072,"cid":"22IJ0084","pid":"P00620463VS","t":"Rehabilitation of Flood Control Structure along Gandara River, Brgy. Burabod II and Brgy. Dumaloong, Gandara, Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":38913945.6,"abc":39200000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-01","lat":12.019167,"lon":124.812222,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.03,"wp":[12.01896,124.81235],"wst":"matched","br":"Burabod II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6328},{"i":8073,"cid":"23IJ0043","pid":"P00733763VS","t":"Construction of Flood Control Project, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"MDP CONSTRUCTION SERVICES","c":19761387.58,"abc":19800000.0,"fy":"2023","sd":"05/10/2023","cd":"2024-07-11","lat":12.0171,"lon":124.8129,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6329},{"i":8074,"cid":"24IJ0016","pid":"P00820421VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Catorce De Agusto, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JUPA CONSTRUCTION","c":48485486.62,"abc":49000000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-11-09","lat":12.016453,"lon":124.813195,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.07,"wp":[12.01629,124.81253],"wst":"matched","br":"Catorce De Agusto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6330},{"i":8075,"cid":"23KK0012","pid":"P00721638MN","t":"Construction of Flood Control Structure along Balatukan River, Barangay Kibanban, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-12-14","lat":8.979795,"lon":124.81333,"sm":134,"fm":134,"tm":134,"am":712,"md":20.65,"ls":"outside","ww":"Balatukan","wn":"Balatukan RIver","wd":21.4,"wp":[8.78648,124.82179],"wst":"matched","br":"Kibanban","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":80,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":20.65,"text":"The pin is 20.6 km outside Balingasag, Misamis Oriental, the nearest municipality the record claims. It falls in Kinoguitan, Misamis Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.79,"value":21.4,"text":"The title names Balatukan, which OpenStreetMap maps through the stated municipality, but the pin is 21.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":20},{"i":8076,"cid":"23MG0016","pid":"P00732166MN","t":"Construction of River Bank Protection along Sumbong Creek, Brgy. Poblacion, T'boli, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"T'BOLI (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"SOUTHCAST CONSTRUCTION","c":24498872.03,"abc":24500000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-08-02","lat":6.229059,"lon":124.813477,"sm":1499,"fm":1499,"tm":1499,"am":1499,"md":0.0,"ls":"inside","ww":"Sumbong","wn":"Sumbong Creek","wd":0.03,"wp":[6.22892,124.81326],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6331},{"i":8077,"cid":"22IG0013","pid":"P00630235VS","t":"Construction of Flood Control Structure, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":48485534.41,"abc":49000000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-12-14","lat":10.666042,"lon":124.814695,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6332},{"i":8078,"cid":"22IJ0019","pid":"P00620341VS","t":"Construction of Flood Control Structure along Gandara River, Brgy. Bangahon (Phase II), Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"RNMK  CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP. (FOR: RNMK CONST. & DEV'T)","c":48408761.87,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2023-11-29","lat":12.025278,"lon":124.816111,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.01,"wp":[12.02535,124.81603],"wst":"matched","br":"Bangahon","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6333},{"i":8079,"cid":"22IG0010","pid":"P00620337VS","t":"Construction of Dungca-an Flood Control Structure, (Pagbanganan Section), Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48338500.0,"abc":49000000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-11-30","lat":10.681286,"lon":124.8187,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8080],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6334},{"i":8080,"cid":"23IG0056","pid":"P00721967VS","t":"Construction of Dungca-an Flood Control Structure, (Pagbanganan Section), Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"ARCA BUILDERS","c":48216266.02,"abc":49000000.0,"fy":"2023","sd":"05/23/2023","cd":"2024-03-22","lat":10.681286,"lon":124.8187,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8079],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6335},{"i":8081,"cid":"24IJ0019","pid":"P00820379VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Calirocan, Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":67514703.27,"abc":67550000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-11-11","lat":12.019128,"lon":124.819498,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.05,"wp":[12.01932,124.81908],"wst":"matched","br":"Calirocan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6336},{"i":8082,"cid":"23MF0042","pid":"P00721622MN","t":"Construction of Flood Control Structure along Buayan River (Sampao Section), Lutayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LUTAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ABU CONSTRUCTION","c":97656143.98,"abc":97857256.94,"fy":"2023","sd":"04/04/2023","cd":"2024-01-30","lat":6.60015,"lon":124.819772,"sm":834,"fm":834,"tm":834,"am":834,"md":0.0,"ls":"inside","ww":"Buayan","wn":"Buayan River","wd":36.2,"wp":[6.42873,125.09851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6337},{"i":8083,"cid":"21IC0044","pid":"P00549985VS","t":"Construction/Rehabilitation of Flood Control Mitigation Facilities along Mainit River, Brgy. San Vicente, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Alangalang","deo":"Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC. / ONE MYRNA CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/11/2021","cd":"2022-07-28","lat":11.205042,"lon":124.820781,"sm":21,"fm":null,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Mainit","wn":"Mainit River","wd":0.01,"wp":[11.205,124.82088],"wst":"matched","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6338},{"i":8084,"cid":"22M00072","pid":"P00620251MN","t":"Construction of River Bank Protection along Banga River, Banga, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"BANGA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"AMPLEX CONSTRUCTION AND SUPPLIES","c":80668846.82,"abc":101325000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-12-29","lat":6.373084,"lon":124.821102,"sm":148,"fm":148,"tm":148,"am":148,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.01,"wp":[6.37309,124.82118],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6339},{"i":8085,"cid":"22IJ0078","pid":"P00620418VS","t":"Construction of Flood Control Structure along Gandara, River, Brgy. Bangahon, Gandara, Samar (Phase III)","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":48956362.43,"abc":49000000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-11","lat":12.027222,"lon":124.821944,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangahon","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6340},{"i":8086,"cid":"21IC0043","pid":"P00549986VS","t":"Construction/Rehabilitation of Flood Control Mitigation Facilities along Mainit River, Phase 3, Brgy. Cavite, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Alangalang","deo":"Leyte 1st District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / MILES CONSTRUCTION AND ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/11/2021","cd":"2022-07-28","lat":11.21775,"lon":124.824831,"sm":21,"fm":null,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Mainit","wn":"Mainit River","wd":0.04,"wp":[11.21768,124.82449],"wst":"matched","br":"Cavite","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6341},{"i":8087,"cid":"23MI0058","pid":"P00721507MN","t":"Construction of Kabacan River Flood Control Project (Plang to Pulangi River Section-Phase IV), USM, Kabacan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":40070140.29,"abc":40180000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-09-22","lat":7.128504,"lon":124.824875,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.03,"wp":[7.12876,124.82497],"wst":"matched","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6342},{"i":8088,"cid":"22MG0033","pid":"P00630531MN","t":"Construction of Riverbank Protection along Safall River, Brgy. Poblacion, T'boli, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"T'BOLI (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":49407796.37,"abc":49408000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-07-28","lat":6.216389,"lon":124.825833,"sm":1499,"fm":1499,"tm":1499,"am":1499,"md":0.0,"ls":"inside","ww":"Safall","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6343},{"i":8089,"cid":"23MG0034","pid":"P00732162MN","t":"Construction of River Bank Protection along Safali River, Brgy. Poblacion, T'boli, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"T'BOLI (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":24499667.6,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-07","lat":6.220376,"lon":124.826487,"sm":1499,"fm":1499,"tm":1499,"am":1499,"md":0.0,"ls":"inside","ww":"Safali","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6344},{"i":8090,"cid":"23MF0043","pid":"P00721623MN","t":"Construction of Flood Control Structure along Buayan River (Maindang Section), Lutayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LUTAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ABU CONSTRUCTION","c":97730411.86,"abc":97880478.24,"fy":"2023","sd":"04/24/2023","cd":"2023-11-24","lat":6.571981,"lon":124.827175,"sm":834,"fm":834,"tm":834,"am":834,"md":0.0,"ls":"inside","ww":"Buayan","wn":"Buayan River","wd":33.94,"wp":[6.42873,125.09851],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6345},{"i":8091,"cid":"24IC0081","pid":"P00820899VS","t":"Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN MIGUEL (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP.","c":96434585.4,"abc":96500000.0,"fy":"2024","sd":"07/26/2024","cd":"2024-12-02","lat":11.304658,"lon":124.828624,"sm":1334,"fm":1334,"tm":1334,"am":1334,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6346},{"i":8092,"cid":"23IC0112","pid":"P00721922VS","t":"Construction of Flood Control along Libtong Bridge (Downstream), Barangay Libtong, San Miguel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN MIGUEL (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"D.L. AUREO CONSTRUCTION / JELM CONSTRUCTION CORP.","c":96435000.0,"abc":96500000.0,"fy":"2023","sd":"07/10/2023","cd":"2024-03-18","lat":11.292014,"lon":124.831862,"sm":1334,"fm":1334,"tm":1334,"am":1334,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6347},{"i":8093,"cid":"22IJ0034","pid":"P00630243VS","t":"Construction of Slope Protection Structure along Brgy. Piñaplata to Brgy. Tawiran Road, Gandara, Samar","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"DANILORSO CORP. OPERATING UNDER THE NAME OF DRS BUILDERS AND CONSTRUCTION SUPPLIES","c":19492118.36,"abc":19600000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-07-07","lat":12.077215,"lon":124.833163,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Piñaplata","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6348},{"i":8094,"cid":"22IL0173","pid":"P00632992VS","t":"Construction of Barangay Combado Flood Control Structure, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION) / UKC BUILDERS, INC.","c":96455982.75,"abc":96500000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-09-05","lat":10.135653,"lon":124.833728,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Combado Flood Control Structure","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6349},{"i":8095,"cid":"24MI0045","pid":"P00835886MN","t":"Construction of Kabacan River Flood Control (Plang to Pulangi-Phase I), Kabacan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"BORDERLINE CONSTRUCTION & SUPPLY","c":29380000.45,"abc":29400000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-23","lat":7.125137,"lon":124.83427,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.01,"wp":[7.12502,124.83422],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6350},{"i":8096,"cid":"22IL0104","pid":"P00632047VS","t":"Construction of Combado Flood Control, Combado, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":19776940.86,"abc":19800000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-02-12","lat":10.13663,"lon":124.834384,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6351},{"i":8097,"cid":"24MI0046","pid":"P00835887MN","t":"Construction of Kabacan River Flood Control (Plang to Pulangi-Phase II), Kabacan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"BORDERLINE CONSTRUCTION & SUPPLY","c":29379974.47,"abc":29400000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-11-19","lat":7.124792,"lon":124.834869,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.01,"wp":[7.12473,124.83484],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6352},{"i":8098,"cid":"22K00156","pid":"P00630491MN","t":"Construction of Flood Mitigation Structure along Bolisong River, Kinoguitan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"KINOGUITAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":64814025.23,"abc":67550000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-05-03","lat":9.004072,"lon":124.835702,"sm":712,"fm":712,"tm":712,"am":135,"md":0.1,"ls":"boundary","ww":"Bolisong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6353},{"i":8099,"cid":"23IC0031","pid":"P00721704VS","t":"Construction of Flood Control Structure along Mainit River, Brgy. San Francisco East, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"C N E CONSTRUCTION / ONE MYRNA CONSTRUCTION AND SUPPLY","c":48925057.49,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-09-25","lat":11.240682,"lon":124.837208,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Mainit","wn":"Mainit River","wd":0.01,"wp":[11.2407,124.83708],"wst":"matched","br":"San Francisco East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6354},{"i":8100,"cid":"22KK0043","pid":"P00630588MN","t":"Construction of Drainage System, Kalawag-Quezon Road, Kalawag, Balingasag, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"L & L CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"06/05/2022","cd":"2022-11-30","lat":8.760473,"lon":124.837588,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6355},{"i":8101,"cid":"22IL0079","pid":"P00630687VS","t":"Construction of Basak River Control, Barangay Basak, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"3MC KING CIVIL ENGINEERING CONSTRUCTION","c":4950000.0,"abc":4900000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-11","lat":10.138524,"lon":124.838952,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":"Basak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Basak","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":1005},{"i":8102,"cid":"23IC0059","pid":"P00731685VS","t":"Construction of Drainage, Channel Ridge View, Brgy. Poblacion, District I, Babatngon, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"HI-TRI DEVELOPMENT CORPORATION","c":24391539.96,"abc":24500000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-09-14","lat":11.422026,"lon":124.839017,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6356},{"i":8103,"cid":"22IL0077","pid":"P00634058VS","t":"Construction of Basak - Tuburan River Control, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"APTJ CONSTRUCTION SERVICES","c":4924360.55,"abc":4950000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-09-04","lat":10.143939,"lon":124.839758,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":"Tuburan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6357},{"i":8104,"cid":"24KK0067","pid":"P00836185MN","t":"Construction of Flood Control Structure along Balatukan River Brgy. Kibanban, Balingasag, Misamis Oriental (Phase II)","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / CHIU BUILDERS","c":39599823.02,"abc":39600000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-12-01","lat":8.785771,"lon":124.840193,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan RIver","wd":0.0,"wp":[8.78579,124.8402],"wst":"matched","br":"Kibanban","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6358},{"i":8105,"cid":"22IJ0026","pid":"P00630244VS","t":"Construction of Slope Protection Structure along Brgy. Rizal, Gandara, Samar","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":19597359.34,"abc":19600000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-12-05","lat":12.088929,"lon":124.840518,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6359},{"i":8106,"cid":"22IL0128","pid":"P00633031VS","t":"Construction of Tuburan Flood Control Structure, Tunga-Tunga, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"AMB ENTERPRISES","c":9787125.0,"abc":9800000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-10-18","lat":10.135722,"lon":124.840575,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6360},{"i":8107,"cid":"24KK0056","pid":"P00821223MN","t":"Construction of Flood Control Structure along Balatukan River, Package 2, Balingasag, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":29399467.33,"abc":29400000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-12-01","lat":8.785184,"lon":124.841256,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":"Balatukan","wn":"Balatukan RIver","wd":0.03,"wp":[8.78543,124.84133],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6361},{"i":8108,"cid":"24MI0055","pid":"P00820349MN","t":"Construction of Kabacan River Flood Control Project (Carabao Center Phase III), USM, Kabacan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"KABACAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":65592867.27,"abc":65620000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-09-23","lat":7.114689,"lon":124.843446,"sm":682,"fm":682,"tm":682,"am":682,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.01,"wp":[7.11467,124.84357],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6362},{"i":8109,"cid":"22MG0034","pid":"P00630613MN","t":"Construction of Bank Protection Structure along Bolok Creek, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS / PASE CONSTRUCTION","c":48999530.71,"abc":49000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-08-22","lat":6.500556,"lon":124.843611,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Bolok","wn":"B'lok Creek","wd":0.02,"wp":[6.50066,124.84371],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6363},{"i":8110,"cid":"24IL0013","pid":"P00820260VS","t":"Construction of Bogo Flood Control Segment 2, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / JGO BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-12-11","lat":10.148521,"lon":124.843766,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Segment 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6364},{"i":8111,"cid":"22IL0126","pid":"P00633029VS","t":"Construction of Himakilo Flood Control Structure, Bontoc, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"BONTOC (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"UNIMASTERS CONGLOMERATION, INCORPORATED","c":39157464.26,"abc":39200000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-01-06","lat":10.355825,"lon":124.942744,"sm":226,"fm":226,"tm":226,"am":226,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6365},{"i":8112,"cid":"24IJ0009","pid":"P00820256VS","t":"Construction of La Paz CIS Protection Works, San Jorge, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN JORGE (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"DANILORSO CORP. OPERATING UNDER THE NAME OF DRS BUILDERS AND CONSTRUCTION SUPPLIES","c":9741200.0,"abc":9800000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-10-11","lat":12.000609,"lon":124.844038,"sm":1297,"fm":1297,"tm":1297,"am":565,"md":0.35,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6366},{"i":8113,"cid":"23IF0085","pid":"P00731643VS","t":"Construction of Matlang Flood Control (Upstream), Isabel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ISABEL (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":96469960.03,"abc":96500000.0,"fy":"2023","sd":"06/19/2023","cd":"2024-04-13","lat":10.898611,"lon":124.457222,"sm":650,"fm":650,"tm":650,"am":650,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6367},{"i":8114,"cid":"23MB0033","pid":"P00734408MN","t":"Construction of Drainage System (Box Culvert), Purok 6, Barangay Bunao, Tupi, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"TUPI (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"ROCKSTONE CONSTRUCTION SERVICES & SUPPLY","c":4948882.27,"abc":4950000.0,"fy":"2023","sd":"07/20/2023","cd":"2023-12-18","lat":6.331489,"lon":124.944476,"sm":1609,"fm":1609,"tm":1609,"am":1609,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6368},{"i":8115,"cid":"21FH0100","pid":"P00561842LZ","t":"Construction of River Flood Control Structure (Phase 2), Barangay Mabini Proper, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Caramoran","deo":"Catanduanes District Engineering Office","co":"MECHANICS CONSTRUCTION CORPORATION","c":14837820.39,"abc":14848760.0,"fy":"2021","sd":"08/09/2021","cd":"2022-10-05","lat":13.916732,"lon":124.162842,"sm":332,"fm":null,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabini Proper","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6369},{"i":8116,"cid":"23IC0057","pid":"P00731683VS","t":"Construction of Drainage System Brgy. District III, Babatngon, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JDR CONSTRUCTION","c":3905246.26,"abc":3920000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-06-11","lat":11.42079,"lon":124.845701,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"District III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6370},{"i":8117,"cid":"22MH0032","pid":"P00631112MN","t":"Construction of Flood Control, Barangay Ala, Esperanza, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ESPERANZA (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CASTILLANES CONSTRUCTION AND SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-01","lat":6.674064,"lon":124.566358,"sm":552,"fm":552,"tm":552,"am":653,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6371},{"i":8118,"cid":"24IF0035","pid":"P00820243VS","t":"Construction of Drainage System, Barangay Alta Vista, Ormoc City","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"MELGAZO CONSTRUCTION AND SUPPLY","c":6435658.12,"abc":6468000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-04-17","lat":11.013998,"lon":124.620471,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alta Vista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6372},{"i":8119,"cid":"23MG0029","pid":"P00721508MN","t":"Construction of River Bank Protection along Banga River, Barangay BS Aquino, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":27437932.69,"abc":27440000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-09-11","lat":6.526111,"lon":124.698056,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.06,"wp":[6.52602,124.69856],"wst":"matched","br":"BS Aquino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6373},{"i":8120,"cid":"24IA0039","pid":"P00820224VS","t":"Construction of Flood Control Structure, Barangay Ermita, Phase I, Maripipi, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"MARIPIPI (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":9646438.6,"abc":9793338.66,"fy":"2024","sd":"02/14/2024","cd":"2024-04-10","lat":11.771062,"lon":124.343876,"sm":942,"fm":942,"tm":942,"am":942,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ermita","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6374},{"i":8121,"cid":"24MD0034","pid":"P00820185MN","t":"Construction of Flood Control Structure along Balogo River (Upper Balogo Elementary School Section), Barangay Anick, Pigkawayan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIGCAWAYAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":16576700.0,"abc":16660000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-06-24","lat":7.312034,"lon":124.457971,"sm":1127,"fm":1127,"tm":1127,"am":1127,"md":0.0,"ls":"inside","ww":"Balogo","wn":"Balogo River","wd":0.01,"wp":[7.31208,124.45795],"wst":"matched","br":"Anick","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6375},{"i":8122,"cid":"22MD0056","pid":"P00620272MN","t":"Construction of Flood Control Structure, Balogo River (Downstream of Balogo Bridge), Balogo, Pigcawayan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIGCAWAYAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / GFJ CONSTRUCTION SUPPLY & MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-11-03","lat":7.2812,"lon":124.45903,"sm":1127,"fm":1127,"tm":1127,"am":1127,"md":0.0,"ls":"inside","ww":"Balogo","wn":"Balogo River","wd":0.02,"wp":[7.28112,124.45888],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6376},{"i":8123,"cid":"23IA0011","pid":"P00732033VS","t":"Construction of Flood Control Structure, Sitio Buri, Barangay Ungale, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":9894399.28,"abc":9894107.08,"fy":"2023","sd":"02/15/2023","cd":"2023-06-30","lat":11.689704,"lon":124.459196,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ungale","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6377},{"i":8124,"cid":"22IA0097","pid":"P00620152VS","t":"Construction of Alawihaw Flood Control along Naval-Caibiran Cross Country Road, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":18983276.9,"abc":19580481.6,"fy":"2022","sd":"02/21/2022","cd":"2022-09-13","lat":11.579385,"lon":124.459677,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6378},{"i":8125,"cid":"22IA0082","pid":"P00620159VS","t":"Construction of Cabadiangan Flood Control along Naval-Caibiran Cross Country Road, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":14215927.25,"abc":14685875.25,"fy":"2022","sd":"02/21/2022","cd":"2022-07-10","lat":11.581567,"lon":124.460727,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6379},{"i":8126,"cid":"24IF0043","pid":"P00820238VS","t":"Construction of Box Culvert, Barangay Matlang, Isabel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ISABEL (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":5433119.87,"abc":5488000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-06-05","lat":10.886659,"lon":124.46124,"sm":650,"fm":650,"tm":650,"am":650,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matlang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6380},{"i":8127,"cid":"23HB0162","pid":"P00745643VS","t":"Rehabilitation/ Reconstruction of Napo River Control, Alicia, Bohol, Sta. 0+000 Sta. 0+500","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"ALICIA (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"KMCM BUILDERS AND DEVELOPMENT CORPORATION / GICAR CONSTRUCTION, INC.","c":96131344.04,"abc":96286735.0,"fy":"2023","sd":"08/11/2023","cd":"2024-02-16","lat":9.87366,"lon":124.46282,"sm":37,"fm":37,"tm":37,"am":37,"md":0.0,"ls":"inside","ww":"Napo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6381},{"i":8128,"cid":"24IE0035","pid":"P00832684VS","t":"Construction of Tide Embankment, Barangay Kawayan, Leyte, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"LEYTE (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":4900400.55,"abc":4949901.38,"fy":"2024","sd":"02/14/2024","cd":"2024-04-02","lat":11.43305,"lon":124.46583,"sm":772,"fm":772,"tm":772,"am":772,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kawayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6382},{"i":8129,"cid":"24HB0063","pid":"P00820182VS","t":"Construction of Cayacay SRIS Flood Protection Dike, Alicia, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"ALICIA (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"FUENTABUILT CONSTRUCTION CORP.","c":14677314.84,"abc":14700000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-10-07","lat":9.899033,"lon":124.469421,"sm":37,"fm":37,"tm":37,"am":37,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6383},{"i":8130,"cid":"23IA0019","pid":"P00721701VS","t":"Rehabilitation of Santol Flood Control along Biliran Circumferential Road, Phase III, Biliran, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION)","c":18983417.75,"abc":19580626.85,"fy":"2023","sd":"02/15/2023","cd":"2023-06-10","lat":11.473965,"lon":124.47063,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6384},{"i":8131,"cid":"22IA0107","pid":"P00633025VS","t":"Construction of Flood Control Structure, Barangay Pinangomhan, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":23741640.6,"abc":24475918.13,"fy":"2022","sd":"03/29/2022","cd":"2022-08-31","lat":11.510782,"lon":124.471014,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinangomhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6385},{"i":8132,"cid":"23HB0069","pid":"P00721898VS","t":"Construction of Anoling Tubod Gabayan Flood Control, Candijay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"CLAIRE CONSTRUCTION AND SUPPLY CORPORATION / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":77070000.0,"abc":77200000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-12-15","lat":9.849747,"lon":124.47102,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6386},{"i":8133,"cid":"24HB0008","pid":"P00820065VS","t":"Construction of Gabayan River Flood Control, Candijay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"FUENTABUILT CONSTRUCTION CORP. / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":139442021.8,"abc":139442500.0,"fy":"2024","sd":"06/11/2024","cd":"2024-12-07","lat":9.848819,"lon":124.471644,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":"Gabayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6387},{"i":8134,"cid":"23IA0057","pid":"P00721957VS","t":"Construction of Santol Flood Control along Biliran Circumferential Road, Phase V, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"VK BUILDERS INC.","c":23962264.9,"abc":24488773.56,"fy":"2023","sd":"03/12/2023","cd":"2023-07-16","lat":11.479959,"lon":124.471972,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6388},{"i":8135,"cid":"24IF0033","pid":"P00820241VS","t":"Construction of Box Culvert, Palompon-Isabel-Merida-Leyte Rd - K1095+(-429.40), Barangay Bilwang, Isabel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ISABEL (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":4875499.34,"abc":4900000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-06-12","lat":10.878658,"lon":124.472839,"sm":650,"fm":650,"tm":650,"am":650,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bilwang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6389},{"i":8136,"cid":"23IA0089","pid":"P00733307VS","t":"Construction of Santol Flood Control along Biliran Circumferential Road Phase 5, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION)","c":19098797.05,"abc":19588509.78,"fy":"2023","sd":"04/02/2023","cd":"2023-08-24","lat":11.481608,"lon":124.47351,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6390},{"i":8137,"cid":"23ME0057","pid":"P00721660MN","t":"Construction of Kalaong Flood Control Structure, Maitum, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAITUM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":48999139.07,"abc":49000000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-12-14","lat":6.088722,"lon":124.474236,"sm":882,"fm":882,"tm":882,"am":882,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6391},{"i":8138,"cid":"22ME0033","pid":"P00620184MN","t":"Construction of Flood Control along Kalaong River (Upstream), Maitum, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAITUM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":48999481.86,"abc":49000000.0,"fy":"2022","sd":"03/17/2022","cd":"2023-03-28","lat":6.086334,"lon":124.474478,"sm":882,"fm":882,"tm":882,"am":882,"md":0.0,"ls":"inside","ww":"Kalaong","wn":"Kalaong River","wd":0.07,"wp":[6.08687,124.47421],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6392},{"i":8139,"cid":"22HB0090","pid":"P00620034VS","t":"Construction of Flood Mitigation Structure along Tangohay River, Barangay Bulawan and Canhaway, Sta. 0+000.00 - Sta. 0+937.00, Guindulman, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GUINDULMAN (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":94371932.71,"abc":96500000.0,"fy":"2022","sd":"05/02/2022","cd":"2023-04-02","lat":9.765708,"lon":124.474549,"sm":601,"fm":601,"tm":601,"am":601,"md":0.0,"ls":"inside","ww":"Tangohay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bulawan","len":937.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6393},{"i":8140,"cid":"24HB0114","pid":"P00835003VS","t":"Construction of Carood River Control Structure, Candijay, Bohol (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MOG CONSTRUCTION INC. / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":39525949.58,"abc":39600000.0,"fy":"2024","sd":"05/06/2024","cd":"2024-09-25","lat":9.855955,"lon":124.475611,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":"Carood","wn":"Carood River","wd":0.01,"wp":[9.85599,124.47569],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6394},{"i":8141,"cid":"22K00280","pid":"P00620344MN","t":"Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Right Side), Package 1, Alubijid, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"ALUBIJID (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":141124491.5,"abc":144750000.0,"fy":"2022","sd":"06/06/2022","cd":"2024-03-25","lat":8.573132,"lon":124.475953,"sm":49,"fm":49,"tm":49,"am":49,"md":0.0,"ls":"inside","ww":"Alubijid","wn":"Alubijid River","wd":0.0,"wp":[8.5731,124.47596],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6395},{"i":8142,"cid":"22K00281","pid":"P00620345MN","t":"Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Left Side), Package 2, Alubijid, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"ALUBIJID (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":139728160.1,"abc":144750000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-10-14","lat":8.572588,"lon":124.476225,"sm":49,"fm":49,"tm":49,"am":49,"md":0.0,"ls":"inside","ww":"Alubijid","wn":"Alubijid River","wd":0.03,"wp":[8.5725,124.47601],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6396},{"i":8143,"cid":"22I00074","pid":"P00632995VS","t":"Construction of Flood Control Structure, Brgy. Pinangumhan, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"EZJONES CONSTRUCTION INC. / ROVING PREMIER CONTRACTORS, INC.","c":96499745.52,"abc":96279896.21,"fy":"2022","sd":"06/13/2022","cd":"2023-01-24","lat":11.517495,"lon":124.477155,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinangumhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6397},{"i":8144,"cid":"23HB0077","pid":"P00733736VS","t":"Construction of Tangohay River Control, Sitio Ponod, Sawang, Guindulman, Bohol Sta. 0+000 - Sta.0+260","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GUINDULMAN (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"JAMARI CONSTRUCTION (FORMERLY FRAE CONSTRUCTION) / ALTACS CONSTRUCTION","c":49104025.8,"abc":49500000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-01-07","lat":9.76103,"lon":124.47894,"sm":601,"fm":601,"tm":601,"am":601,"md":0.0,"ls":"inside","ww":"Tangohay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":260.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6398},{"i":8145,"cid":"23HB0071","pid":"P00721901VS","t":"Construction of Flood Control Canhaway and Sitio Ponod, Barangay Sawang, Guindulman, Bohol Phase 2","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GUINDULMAN (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"04/10/2023","cd":"2023-11-13","lat":9.76072,"lon":124.479231,"sm":601,"fm":601,"tm":601,"am":601,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sawang","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6399},{"i":8146,"cid":"23IA0100","pid":"P00733752VS","t":"Construction of Flood Control in Brgy. San Lorenzo, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":4823823.95,"abc":4947511.76,"fy":"2023","sd":"03/29/2023","cd":"2023-07-20","lat":11.69195,"lon":124.479963,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6400},{"i":8147,"cid":"23IA0010","pid":"P00732032VS","t":"Construction of Flood Control Structure, Barangay San Lorenzo, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":9896464.35,"abc":9893470.08,"fy":"2023","sd":"02/15/2023","cd":"2023-06-30","lat":11.693076,"lon":124.480185,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6401},{"i":8148,"cid":"22ME0072","pid":"P00620089MN","t":"Construction of Kalaneg River Control, Maitum, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAITUM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":86849785.36,"abc":86850000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-25","lat":6.097947,"lon":124.480525,"sm":882,"fm":882,"tm":882,"am":882,"md":0.0,"ls":"inside","ww":"Kalaneg","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6402},{"i":8149,"cid":"24IA0004","pid":"P00832671VS","t":"Construction of Flood Control Structure, Barangay Inasuyan, Kawayan, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":14546001.04,"abc":14839605.86,"fy":"2024","sd":"02/11/2024","cd":"2024-04-29","lat":11.692388,"lon":124.480539,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inasuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6403},{"i":8150,"cid":"23IF0061","pid":"P00733757VS","t":"Construction of Flood Control Project in Brgy. Bonoy, Matag-ob, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MATAG-OB (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JSONS BUILDERS","c":4900499.85,"abc":4950000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-07-25","lat":11.153056,"lon":124.481111,"sm":950,"fm":950,"tm":950,"am":950,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6404},{"i":8151,"cid":"24IA0072","pid":"P00834675VS","t":"Construcion of Canila Flood Control, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":28765800.3,"abc":29380396.06,"fy":"2024","sd":"02/27/2024","cd":"2024-07-25","lat":11.49189,"lon":124.48248,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6405},{"i":8152,"cid":"22IA0113","pid":"P00630231VS","t":"Construction of Seawall, Brgy. Inasuyan, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":9601120.25,"abc":9889353.31,"fy":"2022","sd":"03/20/2022","cd":"2022-08-06","lat":11.694071,"lon":124.484199,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inasuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6406},{"i":8153,"cid":"22IA0058","pid":"P00633235VS","t":"Construction of Seawall, Brgy. Inasuyan, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"W.B. ALAGAO CONSTRUCTION","c":9322796.85,"abc":9792853.86,"fy":"2022","sd":"03/16/2022","cd":"2022-08-02","lat":11.69408,"lon":124.484865,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Inasuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6407},{"i":8154,"cid":"23HB0062","pid":"P00721906VS","t":"Construction of Flood Control at Casbu, Guindulman, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GUINDULMAN (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)","c":96468183.0,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-02-18","lat":9.785957,"lon":124.485405,"sm":601,"fm":601,"tm":601,"am":601,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6408},{"i":8155,"cid":"23IA0066","pid":"P00721961VS","t":"Construction of Flood Control Structure, Brgy. Canila Phase II, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":47902300.7,"abc":48959832.14,"fy":"2023","sd":"03/12/2023","cd":"2023-09-15","lat":11.495802,"lon":124.4864,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canila Phase II","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6409},{"i":8156,"cid":"24IJ0010","pid":"P00820255VS","t":"Construction of Danao CIS Protection Works along the Dam, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"MDP CONSTRUCTION SERVICES","c":9755762.05,"abc":9800000.0,"fy":"2024","sd":"09/03/2024","cd":"2024-12-04","lat":12.3538,"lon":124.488963,"sm":304,"fm":304,"tm":304,"am":215,"md":1.92,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6410},{"i":8157,"cid":"22IH0018","pid":"P00630684VS","t":"Construction of Drainage Canal, Barangay Layuhan, San Jose, Northern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN JOSE (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"SAL CONSTRUCTION","c":4801992.94,"abc":4949633.01,"fy":"2022","sd":"02/21/2022","cd":"2022-08-04","lat":12.532031,"lon":124.490708,"sm":1303,"fm":1303,"tm":1303,"am":1303,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Layuhan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6411},{"i":8158,"cid":"23M00003","pid":"P00721450MN","t":"Construction of Flood Control Structure, Pulangi River, Downstream of Pagalungan Bridge, Pikit, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIKIT (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":105228140.2,"abc":106150000.0,"fy":"2023","sd":"08/29/2023","cd":"2024-03-31","lat":7.052778,"lon":124.492222,"sm":1128,"fm":1128,"tm":1128,"am":973,"md":4.67,"ls":"outside","ww":"Pulangi","wn":"Pulangi River","wd":35.66,"wp":[7.14229,124.80235],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":50,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.72,"value":4.67,"text":"The pin is 4.7 km outside Pikit, Cotabato, the nearest municipality the record claims. It falls in Midsayap, Cotabato.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":191},{"i":8159,"cid":"22KF0084","pid":"P00630583MN","t":"Construction of Slope Protection along Sta. Filomena - Bonbonon - Digkilaan - Rogongon Road (Dungo-an Section), Barangay Rogongon, Iligan City, Lanao del Norte","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"OLISON CORPORATION / A.C. RIVERO DEVELOPMENT CORPORATION","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-21","lat":8.204752,"lon":124.494699,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rogongon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6412},{"i":8160,"cid":"22HB0145","pid":"P00642512VS","t":"Repair/Rehabilitation of Flood Control, Tabajan, Guindulman, Bohol","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"GUINDULMAN (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":27612750.52,"abc":28033250.0,"fy":"2022","sd":"04/08/2022","cd":"2022-12-01","lat":9.765497,"lon":124.495772,"sm":601,"fm":601,"tm":601,"am":601,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6413},{"i":8161,"cid":"24HB0001","pid":"P00832214VS","t":"Construction of Flood Control Structure, Sitio Ponod to Sitio Sarangani, Brgy. Poblacion, Candijay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":96399998.65,"abc":96500000.0,"fy":"2024","sd":"06/10/2024","cd":"2025-04-07","lat":9.808942,"lon":124.496504,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6414},{"i":8162,"cid":"24HB0113","pid":"P00820868VS","t":"Construction of Tumuran - Sarangani River Control, Phase II, Candijay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":144590167.8,"abc":144750000.0,"fy":"2024","sd":"05/06/2024","cd":"2024-10-07","lat":9.810825,"lon":124.497023,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":"Sarangani","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6415},{"i":8163,"cid":"24HB0022","pid":"P00832227VS","t":"Construction of Flood Control Structure, Brgy. Poblacion, Candijay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"CANDIJAY (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":48190168.0,"abc":48250000.0,"fy":"2024","sd":"06/10/2024","cd":"2025-02-07","lat":9.810876,"lon":124.497405,"sm":321,"fm":321,"tm":321,"am":321,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6416},{"i":8164,"cid":"21IA0091","pid":"P00549887VS","t":"Construction of Drainage/Slope Protection Works, Sitio Owakon, Barangay Villa Consuelo, Naval, Biliran","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"BILIRAN","mu":"Naval","deo":"Biliran District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":18067234.65,"abc":18587689.99,"fy":"2021","sd":"03/29/2021","cd":"2022-12-21","lat":11.5781,"lon":124.5004,"sm":1018,"fm":null,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Consuelo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6417},{"i":8165,"cid":"22ME0037","pid":"P00620185MN","t":"Construction of Flood Control along Saub River Barangay Malalag, Maitum, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAITUM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":48017953.88,"abc":48020000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-22","lat":6.058217,"lon":124.502569,"sm":882,"fm":882,"tm":882,"am":882,"md":0.0,"ls":"inside","ww":"Saub","wn":"Saub River","wd":0.03,"wp":[6.05844,124.50253],"wst":"matched","br":"Malalag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6418},{"i":8166,"cid":"24IA0076","pid":"P00834678VS","t":"Construction of Sanggalang Flood Control, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":9610485.95,"abc":9791631.14,"fy":"2024","sd":"02/25/2024","cd":"2024-05-13","lat":11.4828,"lon":124.5048,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6419},{"i":8167,"cid":"23IE0036","pid":"P00733756VS","t":"Construction of Flood Control Structure, Phase 2, Barangay Sambulawan, Leyte, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"LEYTE (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":4812204.39,"abc":4899997.76,"fy":"2023","sd":"03/27/2023","cd":"2023-05-10","lat":11.36181,"lon":124.50485,"sm":772,"fm":772,"tm":772,"am":772,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sambulawan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6420},{"i":8168,"cid":"24IA0093","pid":"P00834670VS","t":"Construction of Flood Control Structure, Phase 3, Barangay Sanggalang, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":19302950.5,"abc":19581553.06,"fy":"2024","sd":"03/10/2024","cd":"2024-08-16","lat":11.4836,"lon":124.505,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sanggalang","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6421},{"i":8169,"cid":"22MD0057","pid":"P00620274MN","t":"Construction of Flood Control Structure, Libungan River (Nalin Section-Phase V), Nalin, Midsayap, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MIDSAYAP (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"MUST ENTERPRISES","c":48949154.29,"abc":49000000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-12-05","lat":7.23227,"lon":124.50519,"sm":973,"fm":973,"tm":973,"am":973,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.01,"wp":[7.23231,124.50526],"wst":"matched","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6422},{"i":8170,"cid":"23IE0007","pid":"P00732047VS","t":"Construction of Flood Control Structure, Barangay Culasi, Leyte, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"LEYTE (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":9603998.51,"abc":9799998.48,"fy":"2023","sd":"02/23/2023","cd":"2023-04-18","lat":11.43768,"lon":124.50619,"sm":772,"fm":772,"tm":772,"am":772,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Culasi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6423},{"i":8171,"cid":"24MD0036","pid":"P00820093MN","t":"Construction of Flood Control Structure along Libungan River (Barangay Gumaga Section-Phase IV), Barangay Gumaga, Libungan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"LIBUNGAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":96017500.0,"abc":96500000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-11-21","lat":7.231509,"lon":124.507045,"sm":784,"fm":784,"tm":784,"am":973,"md":0.03,"ls":"boundary","ww":"Libungan","wn":"Libungan River","wd":0.01,"wp":[7.23143,124.5071],"wst":"matched","br":"Gumaga Section-Phase IV","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6424},{"i":8172,"cid":"23IE0019","pid":"P00721716VS","t":"Construction of Flood Control Structure, Barangay Sambulawan, Leyte, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"LEYTE (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48264998.94,"abc":48999998.92,"fy":"2023","sd":"02/27/2023","cd":"2023-10-03","lat":11.35452,"lon":124.50831,"sm":772,"fm":772,"tm":772,"am":772,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sambulawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6425},{"i":8173,"cid":"23IA0012","pid":"P00732035VS","t":"Construction of Seawall, Barangay Bool West, Culaba, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":9600783.5,"abc":9895674.64,"fy":"2023","sd":"02/15/2023","cd":"2023-05-30","lat":11.681452,"lon":124.510744,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bool West","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6426},{"i":8174,"cid":"22IF0069","pid":"P00633238VS","t":"Construction of Calunangan Flood Control, Merida, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MERIDA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":29699901.67,"abc":29700000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-08-25","lat":10.872999,"lon":124.511664,"sm":969,"fm":969,"tm":969,"am":969,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6427},{"i":8175,"cid":"22IA0104","pid":"P00620409VS","t":"Construction of Flood Control at Brgy. Julita, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"QYT CONSTRUCTION AND SUPPLIES","c":3779447.6,"abc":3916526.0,"fy":"2022","sd":"03/29/2022","cd":"2022-08-07","lat":11.474295,"lon":124.514581,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Julita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6428},{"i":8176,"cid":"23IF0083","pid":"P00721551VS","t":"Construction of Lundag Flood Control, Merida, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MERIDA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) / EVERBUILT CONSTRUCTION","c":96348951.67,"abc":96500000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-01-20","lat":10.928611,"lon":124.516944,"sm":969,"fm":969,"tm":969,"am":969,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6429},{"i":8177,"cid":"23IA0022","pid":"P00721698VS","t":"Construction of Lawaan Flood Control along Biliran Circumferential Road, Phase III, Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":18964633.2,"abc":19581448.85,"fy":"2023","sd":"02/20/2023","cd":"2023-07-14","lat":11.475791,"lon":124.517723,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6430},{"i":8178,"cid":"22IA0055","pid":"P00620163VS","t":"Construction of Lawaan Flood Control along Biliran Circumferential Road, Phase 2, Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":14173092.65,"abc":14687142.62,"fy":"2022","sd":"02/21/2022","cd":"2022-07-30","lat":11.477469,"lon":124.517888,"sm":279,"fm":279,"tm":279,"am":203,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6431},{"i":8179,"cid":"22IA0054","pid":"P00620151VS","t":"Construction of Lawaan Flood Control along Biliran Circumferential Road, Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":28475794.9,"abc":29371629.64,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":11.477474,"lon":124.518091,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6432},{"i":8180,"cid":"24IA0075","pid":"P00834677VS","t":"Construction of Bool East Flood Control, Culaba, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":9608685.75,"abc":9789141.94,"fy":"2024","sd":"02/27/2024","cd":"2024-04-12","lat":11.67133,"lon":124.519215,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6433},{"i":8181,"cid":"22MD0052","pid":"P00630612MN","t":"Rehabilitation of Flood Control Structure along Libungan River (Upstream of Libungan Bridge), Poblacion, Libungan, Cotabato","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"LIBUNGAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-12-02","lat":7.2385,"lon":124.52298,"sm":784,"fm":784,"tm":784,"am":784,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.02,"wp":[7.23861,124.52308],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6434},{"i":8182,"cid":"23IA0058","pid":"P00721958VS","t":"Construction of Amambahag Flood Control along Biliran Circumferential Road Phase VI, Culaba, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS)","c":23938133.6,"abc":24481977.84,"fy":"2023","sd":"03/12/2023","cd":"2023-07-23","lat":11.665444,"lon":124.524349,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6435},{"i":8183,"cid":"24MD0054","pid":"P00833593MN","t":"Construction of Drainage Canal along Kitao Creek, Central Katingawan, Midsayap, Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MIDSAYAP (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":4930000.0,"abc":4950000.0,"fy":"2024","sd":"08/30/2024","cd":"2025-01-02","lat":7.212647,"lon":124.525087,"sm":973,"fm":973,"tm":973,"am":973,"md":0.0,"ls":"inside","ww":"Kitao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6436},{"i":8184,"cid":"22IA0017","pid":"P00620153VS","t":"Construction of Amambahag Flood Control along Biliran Circumferential Road, Culaba, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"YOYEN ENTERPRISES","c":24476943.86,"abc":24476937.33,"fy":"2022","sd":"02/21/2022","cd":"2022-07-04","lat":11.665829,"lon":124.526621,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6437},{"i":8185,"cid":"23IA0091","pid":"P00733309VS","t":"Construction of Amambahag Flood Control along Circumferential Road, Phase 6, Culaba, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"4K VERMARK CIVIL ENGINEERING CONSTRUCTION","c":19169852.5,"abc":19581054.68,"fy":"2023","sd":"03/30/2023","cd":"2023-07-28","lat":11.665943,"lon":124.527168,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6438},{"i":8186,"cid":"24IA0003","pid":"P00820220VS","t":"Construction of Amambahag Flood Control along Biliran Circumferential Road, Phase VII, Culaba, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"CULABA (BILIRAN)","deo":"Biliran District Engineering Office","co":"VK BUILDERS INC.","c":29379045.5,"abc":29378901.22,"fy":"2024","sd":"02/11/2024","cd":"2024-07-29","lat":11.666161,"lon":124.528457,"sm":464,"fm":464,"tm":464,"am":464,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase VII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6439},{"i":8187,"cid":"23IF0078","pid":"P00731639VS","t":"Construction of RM Tan Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":96499917.29,"abc":96500000.0,"fy":"2023","sd":"04/14/2023","cd":"2024-05-17","lat":11.074538,"lon":124.529252,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6440},{"i":8188,"cid":"22IF0068","pid":"P00633239VS","t":"Construction of Macatol Flood Control, Merida, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MERIDA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":29698999.03,"abc":29700000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-11-17","lat":10.980292,"lon":124.532215,"sm":969,"fm":969,"tm":969,"am":969,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6441},{"i":8189,"cid":"22IF0008","pid":"P00620191VS","t":"Construction of Guinobatan Flood Control, Merida, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MERIDA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":19599998.1,"abc":19599657.26,"fy":"2022","sd":"02/21/2022","cd":"2022-07-20","lat":10.902096,"lon":124.532319,"sm":969,"fm":969,"tm":969,"am":969,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6442},{"i":8190,"cid":"22IJ0047","pid":"P00620212VS","t":"Construction of Flood Control Structure, Brgy. Macatingog, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48132095.02,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2023-11-23","lat":12.161326,"lon":124.533978,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macatingog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6443},{"i":8191,"cid":"24MD0051","pid":"P00820110MN","t":"Libungan River Flood Control Project (Abaga Section - Phase VIII), Abaga, Libungan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"LIBUNGAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / GFJ CONSTRUCTION SUPPLY & MERCHANDISE","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"07/15/2024","cd":"2025-02-12","lat":7.241169,"lon":124.535964,"sm":784,"fm":784,"tm":784,"am":784,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.02,"wp":[7.24109,124.53613],"wst":"matched","br":null,"len":null,"ph":"Phase VIII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6444},{"i":8192,"cid":"22MD0050","pid":"P00620273MN","t":"Construction of Flood Control Structure, Libungan River (Abaga Section-Phase VII), Abaga, Libungan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"LIBUNGAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / REEM CONSTRUCTION AND SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-12-02","lat":7.2395,"lon":124.53728,"sm":784,"fm":784,"tm":784,"am":784,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.05,"wp":[7.23992,124.53721],"wst":"matched","br":null,"len":null,"ph":"Phase VII","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6445},{"i":8193,"cid":"24IF0027","pid":"P00820244VS","t":"Construction of Drainage, Barangay Poblacion, Merida, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"MERIDA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JSONS BUILDERS","c":5860000.0,"abc":5880000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-05-22","lat":10.907678,"lon":124.538016,"sm":969,"fm":969,"tm":969,"am":969,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6446},{"i":8194,"cid":"23MH0077","pid":"P00734413MN","t":"Construction of Flood Control, Brgy. Kangkong, Esperanza, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ESPERANZA (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CURVE-LINE CONSTRUCTION","c":4563124.44,"abc":4950000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-10-05","lat":6.680612,"lon":124.539903,"sm":552,"fm":552,"tm":552,"am":552,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kangkong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6447},{"i":8195,"cid":"22I00040","pid":"P00620061VS","t":"Construction of Flood Control, Brgy. Belen, Leyte, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"LEYTE (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"EZJONES CONSTRUCTION INC. / JGO BUILDERS","c":190871336.4,"abc":192799333.6,"fy":"2022","sd":"03/07/2022","cd":"2023-09-16","lat":11.316948,"lon":124.541037,"sm":772,"fm":772,"tm":772,"am":772,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Belen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6448},{"i":8196,"cid":"23IJ0010","pid":"P00721804VS","t":"Construction of Flood Control Structure along Jibatang River, Barangay Basud, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"ND CARANZO BUILDERS AND CONSTRUCTION SUPPLY","c":52938612.0,"abc":53075000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-11-12","lat":12.06384,"lon":124.542781,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Jibatang","wn":"Jibatang River","wd":0.65,"wp":[12.06626,124.53734],"wst":"matched","br":"Basud","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6449},{"i":8197,"cid":"23IF0047","pid":"P00721798VS","t":"Construction of Pagsanga-an Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION / CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":104027000.0,"abc":106150000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-11-25","lat":11.029061,"lon":124.544242,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6450},{"i":8198,"cid":"21IF0069","pid":"P00521714VS","t":"Improvement/Rehabilitation of Pagsanga-an Flood Control Structure, Barangay Lilo-an, Ormoc City, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"Ormoc City","deo":"Leyte 4th District Engineering Office","co":"PREMIUM MEGASTRUCTURES INC.","c":38783901.98,"abc":40825154.49,"fy":"2021","sd":"11/10/2021","cd":"2022-12-21","lat":11.035868,"lon":124.546405,"sm":1043,"fm":null,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lilo-an","len":null,"ph":null,"dup":[8199],"run":[],"cl":[],"L":"field","s":17,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 135,283,901.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1118},{"i":8199,"cid":"22IF0026","pid":"P00620064VS","t":"Construction of Pagsanga-an Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":96499998.59,"abc":96499938.93,"fy":"2022","sd":"02/21/2022","cd":"2023-09-18","lat":11.035868,"lon":124.546405,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8198],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 135,283,901.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1040},{"i":8200,"cid":"23MD0046","pid":"P00732492MN","t":"Construction of Flood Control along Libungan River, Mirasol Alamada, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"ALAMADA (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":4900499.99,"abc":4950000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-03-29","lat":7.38164,"lon":124.546446,"sm":19,"fm":19,"tm":null,"am":19,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.12,"wp":[7.3815,124.54535],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6451},{"i":8201,"cid":"24MD0028","pid":"P00833595MN","t":"Construction of Flood Control Structure along Libungan River, Mirasol, Alamada, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"ALAMADA (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":4920000.0,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-22","lat":7.381385,"lon":124.546462,"sm":19,"fm":19,"tm":19,"am":19,"md":0.0,"ls":"inside","ww":"Libungan","wn":"Libungan River","wd":0.11,"wp":[7.38043,124.54607],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6452},{"i":8202,"cid":"23IF0045","pid":"P00721799VS","t":"Construction of Pagsanga-an Flood Control, (Package 1), Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":106149999.4,"abc":106150000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-07-22","lat":11.032222,"lon":124.547222,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6453},{"i":8203,"cid":"22IA0016","pid":"P00620164VS","t":"Construction of Mainit Flood Control along Biliran Circumferential Road, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"YOYEN ENTERPRISES","c":39160876.26,"abc":39160876.26,"fy":"2022","sd":"02/21/2022","cd":"2022-08-29","lat":11.566223,"lon":124.547972,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6454},{"i":8204,"cid":"23IA0017","pid":"P00721696VS","t":"Construction of Mainit Flood Control along Biliran Circumferential Road, Phase V, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION)","c":24477379.47,"abc":24477292.75,"fy":"2023","sd":"02/15/2023","cd":"2023-06-18","lat":11.568609,"lon":124.549162,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6455},{"i":8205,"cid":"23IA0088","pid":"P00733305VS","t":"Construction of Mapula Flood Control along Biliran Circumferential Road, Phase 2, Downstream, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":19590695.22,"abc":19590629.15,"fy":"2023","sd":"03/30/2023","cd":"2023-06-27","lat":11.57467,"lon":124.549878,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6456},{"i":8206,"cid":"22IJ0030","pid":"P00620342VS","t":"Construction of Flood Control Structure along Jibatang River, Brgy. Nabang, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":43612695.07,"abc":43929480.0,"fy":"2022","sd":"02/08/2022","cd":"2022-10-25","lat":12.13934,"lon":124.551562,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Jibatang","wn":"Jibatang River","wd":0.03,"wp":[12.13907,124.55143],"wst":"matched","br":"Nabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6457},{"i":8207,"cid":"23KL0015","pid":"P00721260MN","t":"Construction of Flood Control Structure along Amoros River (Upstream of Amoros Br.), Amoros, El Salvador City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CITY OF EL SALVADOR (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":86850000.0,"abc":86850000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-07-26","lat":8.533161,"lon":124.552664,"sm":384,"fm":384,"tm":384,"am":384,"md":0.0,"ls":"inside","ww":"Amoros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6458},{"i":8208,"cid":"23IA0067","pid":"P00721959VS","t":"Construction of Calambis Flood Control along Biliran Circumferential Road Phase IV, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":34280548.95,"abc":34279941.34,"fy":"2023","sd":"03/12/2023","cd":"2023-08-10","lat":11.561705,"lon":124.553907,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6459},{"i":8209,"cid":"24ME0017","pid":"P00820203MN","t":"Construction of Pangi Left CIS Protection Works, Maitum, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAITUM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"XIANN THIRDREI BUILDERS","c":14514426.28,"abc":14700000.0,"fy":"2024","sd":"04/09/2024","cd":"2024-10-14","lat":6.066483,"lon":124.554867,"sm":882,"fm":882,"tm":882,"am":882,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6460},{"i":8210,"cid":"22IA0066","pid":"P00620160VS","t":"Construction of Cabibihan Flood Control, Brgy. Cabibihan, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":19582958.02,"abc":19582834.66,"fy":"2022","sd":"02/21/2022","cd":"2022-08-14","lat":11.576766,"lon":124.556374,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabibihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6461},{"i":8211,"cid":"22IF0059","pid":"P00630234VS","t":"Improvement of Pagsanga-an River Control Structure, Mouth A, Brgy. San Juan, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48999998.84,"abc":48999987.9,"fy":"2022","sd":"02/22/2022","cd":"2024-10-05","lat":10.996847,"lon":124.556393,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":"Pagsanga-an","wn":"Pagsangahan River","wd":0.01,"wp":[10.99689,124.55642],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6462},{"i":8212,"cid":"23IF0082","pid":"P00731641VS","t":"Construction of Matica-a Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"COLLERA CONSTRUCTION","c":96499790.73,"abc":96500000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-03-02","lat":11.134924,"lon":124.55981,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6463},{"i":8213,"cid":"22IA0007","pid":"P00630229VS","t":"Construction of Añog Flood Control Structure along Biliran Circumferential Road (Cabucgayan-Biliran Section), Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":28080735.0,"abc":29370018.97,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":11.484601,"lon":124.563333,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6464},{"i":8214,"cid":"22IA0112","pid":"P00633024VS","t":"Construction of Calambis Flood Control, Brgy. Victory, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION)","c":48973319.76,"abc":48951948.48,"fy":"2022","sd":"03/29/2022","cd":"2022-11-08","lat":11.574938,"lon":124.563929,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Victory","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6465},{"i":8215,"cid":"23IF0048","pid":"P00721554VS","t":"Construction of Naghalin Flood Control, Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":96492385.0,"abc":96500000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-02-26","lat":11.146165,"lon":124.56454,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6466},{"i":8216,"cid":"22IJ0045","pid":"P00630239VS","t":"Construction of Flood Control Structures along Sinidman River (Upstream) Phase II, Brgy. Sinidman Occidental, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":48603252.18,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-28","lat":12.14552,"lon":124.564696,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Sinidman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sinidman Occidental","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6467},{"i":8217,"cid":"22IF0061","pid":"P00630233VS","t":"Improvement of Pagsanga-an River at Pagsanga-an River Mouth B, Brgy. San Juan, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48999996.64,"abc":48999968.6,"fy":"2022","sd":"02/22/2022","cd":"2024-03-21","lat":11.002516,"lon":124.564724,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":"Pagsanga-an","wn":"Pagsangahan River","wd":0.12,"wp":[11.00343,124.56411],"wst":"matched","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6468},{"i":8218,"cid":"24IF0050","pid":"P00820237VS","t":"Construction of 3-Barrel Box Culvert, Barangay Naghalin, Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":5821197.36,"abc":5880000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-05-18","lat":11.146938,"lon":124.564905,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Naghalin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6469},{"i":8219,"cid":"22M00057","pid":"P00620098MN","t":"Construction of Tamadang Flood Control, Kiamba, Sarangani, Package A","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":103138477.3,"abc":104171750.0,"fy":"2022","sd":"04/18/2022","cd":"2023-04-06","lat":5.996897,"lon":124.621998,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6470},{"i":8220,"cid":"23IM0123","pid":"P00733291VS","t":"Construction of Retarding Basins at Housing Projects, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) / ML_BUILDERS INC.","c":101207765.1,"abc":101288703.8,"fy":"2023","sd":"12/07/2023","cd":"2024-10-09","lat":11.318564,"lon":124.94587,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6471},{"i":8221,"cid":"22FH0092","pid":"P00632972LZ","t":"Construction of Flood Control, Barangay Mabini, Caramoran, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"CARAMORAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":39599999.28,"abc":39599999.5,"fy":"2022","sd":"07/22/2022","cd":"2023-06-19","lat":13.915415,"lon":124.163613,"sm":332,"fm":332,"tm":332,"am":332,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabini","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6472},{"i":8222,"cid":"23KK0081","pid":"P00721560MN","t":"Construction of Flood Control along Dangoan River, Upstream of Dangoan Br. 1, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUALYZ TRADING","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2023-10-09","lat":8.91017,"lon":125.01125,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":"Dangoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[8236,8336],"run":[],"cl":[],"L":"field","s":32,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 195,625,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":622},{"i":8223,"cid":"23IE0033","pid":"P00721715VS","t":"Construction of Seawall, Sitio Kawayan, Barangay Sta. Rosa, Tabango, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TABANGO (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754997.94,"abc":48999997.93,"fy":"2023","sd":"03/09/2023","cd":"2024-01-07","lat":11.36293,"lon":124.34624,"sm":1501,"fm":1501,"tm":1501,"am":1501,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Rosa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6473},{"i":8224,"cid":"24IF0037","pid":"P00820909VS","t":"Construction of Ahag Flood Control Structure, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":96377194.04,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-11-20","lat":11.029721,"lon":124.62222,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6474},{"i":8225,"cid":"23MH0023","pid":"P00721624MN","t":"Construction of River Bank Protection/Flood Control at Brgy. Ala, Esperanza, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ESPERANZA (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC.","c":48999972.27,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2024-01-29","lat":6.675932,"lon":124.567429,"sm":552,"fm":552,"tm":552,"am":552,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6475},{"i":8226,"cid":"24IJ0015","pid":"P00820422VS","t":"Construction of Flood Control Structure along Gandara River, Barangay La Paz, San Jorge, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN JORGE (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JUPA CONSTRUCTION","c":47991241.99,"abc":49000000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-12-08","lat":11.981724,"lon":124.845853,"sm":1297,"fm":1297,"tm":1297,"am":1297,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":2.48,"wp":[11.99533,124.82776],"wst":"matched","br":"La Paz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6476},{"i":8227,"cid":"21FH0066","pid":"P00561201LZ","t":"Construction of Seawall, Barangay Tilod, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Baras","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":19598760.0,"abc":19598759.05,"fy":"2021","sd":"03/07/2022","cd":"2022-10-02","lat":13.654889,"lon":124.347693,"sm":161,"fm":null,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tilod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6477},{"i":8228,"cid":"24IF0062","pid":"P00820884VS","t":"Construction of Sibugay Flood Control Structure (Upstream), Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JM COLLERA KONSTRACT","c":96499999.9,"abc":96500000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-11-20","lat":10.913477,"lon":124.698265,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6478},{"i":8229,"cid":"24KC0021","pid":"P00820028MN","t":"Construction of Flood Mitigation Structure along Cagayan de Oro City-Dominorog-Camp Kibaritan Rd, (Upstream and Downstream) of Pigcutin Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/12/2024","cd":"2025-05-23","lat":8.035991,"lon":124.623852,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6479},{"i":8230,"cid":"21K00237","pid":"P00522055MN","t":"Construction of Cagayan de Oro Drainage System (Sapang Catchment), Package 4, Bulua, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":95530061.09,"abc":106150000.0,"fy":"2021","sd":"11/22/2021","cd":"2023-12-31","lat":8.506998,"lon":124.624495,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6480},{"i":8231,"cid":"24KH0045","pid":"P00836178MN","t":"Construction of Flood Control Structure along Cagayan de Oro River (Section 4), Barangay Balulang, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":24750000.0,"abc":24750000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-07-25","lat":8.420308,"lon":124.624633,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.03,"wp":[8.42014,124.62444],"wst":"matched","br":"Balulang","len":null,"ph":"Section 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6481},{"i":8232,"cid":"24MF0014","pid":"P00820206MN","t":"Construction of Lambayong RIS Protection Dike, Upstream of Dam, Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ADDED CONSTRUCTION SERVICES","c":29050363.85,"abc":29106856.94,"fy":"2024","sd":"02/15/2024","cd":"2024-05-20","lat":6.673242,"lon":124.626314,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6482},{"i":8233,"cid":"22MF0056","pid":"P00634123MN","t":"Construction of Flood Control Structure, Banga River (Kapingkong Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / GIBUILD DEVELOPMENT CORP.","c":49397332.88,"abc":49497743.12,"fy":"2022","sd":"05/25/2022","cd":"2023-04-25","lat":6.664536,"lon":124.62645,"sm":653,"fm":653,"tm":653,"am":425,"md":0.03,"ls":"boundary","ww":"Banga","wn":"Banga River","wd":0.03,"wp":[6.66445,124.62616],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6483},{"i":8234,"cid":"23IH0109","pid":"P00721971VS","t":"Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"M SQUARE H CONSTRUCTION & SUPPLY","c":22672048.91,"abc":22696455.2,"fy":"2023","sd":"09/11/2023","cd":"2024-03-11","lat":12.509731,"lon":124.627024,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalakit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6484},{"i":8235,"cid":"24IF0045","pid":"P00820242VS","t":"Construction of Drainage at Barangay Sumangga and Barangay Patag, Ormoc City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":9402999.83,"abc":9408000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-05-27","lat":11.010879,"lon":124.62707,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sumangga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6485},{"i":8236,"cid":"23KK0106","pid":"P00734024MN","t":"Construction of Flood Control Project, Upstream of Dangoan Bridge 1, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-02-26","lat":8.91017,"lon":125.01125,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8222,8336],"run":[],"cl":[],"L":"field","s":31,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 195,625,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":655},{"i":8237,"cid":"22K00273","pid":"P00620030MN","t":"Construction of Flood Control Project, Linamon River, Package 1, Linamon, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"LINAMON (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"NDP CONSTRUCTION DEVELOPMENT / AL HUSSEIN CONSTRUCTION","c":56685315.9,"abc":58438470.0,"fy":"2022","sd":"05/30/2022","cd":"2024-03-25","lat":8.1869,"lon":124.16564,"sm":795,"fm":795,"tm":795,"am":795,"md":0.01,"ls":"boundary","ww":"Linamon","wn":"Linamon River","wd":0.11,"wp":[8.18645,124.16657],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6486},{"i":8238,"cid":"23IM0066","pid":"P00731694VS","t":"Construction of Flood Mitigation Structure, Barangay 103, Palanog, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JJ PALACIO CONSTRUCTION","c":48927835.0,"abc":48997835.49,"fy":"2023","sd":"05/15/2023","cd":"2023-08-22","lat":11.25333,"lon":124.945884,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"103","len":null,"ph":null,"dup":[8332],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 159,787,286.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":938},{"i":8239,"cid":"23MF0016","pid":"P00721515MN","t":"Construction of Flood Control Structure, Banga River (OPAG Section), Tacurong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"TACURONG CITY (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48822060.78,"abc":48922088.57,"fy":"2023","sd":"02/17/2023","cd":"2023-11-08","lat":6.667522,"lon":124.627153,"sm":425,"fm":425,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.04,"wp":[6.66774,124.62686],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8264,8274],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23MF0015 to 23MF0017) cover the same site, together worth PHP 146,635,092.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":528},{"i":8240,"cid":"22MF0018","pid":"P00620292MN","t":"Construction of Flood Mitigation Structure along Banga River (Kapingkong Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":37697510.48,"abc":37716010.98,"fy":"2022","sd":"03/16/2022","cd":"2023-02-06","lat":6.661936,"lon":124.627189,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.03,"wp":[6.66207,124.62744],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6487},{"i":8241,"cid":"23IJ0039","pid":"P00733324VS","t":"Construction of River Control, Brgy. Guinbaoyan Norte, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"ETAN CONSTRUCTION","c":28870816.03,"abc":29400000.0,"fy":"2023","sd":"04/07/2023","cd":"2023-10-04","lat":12.095844,"lon":124.627561,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guinbaoyan Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6488},{"i":8242,"cid":"23KH0058","pid":"P00721636MN","t":"Construction of Flood Mitigation Structure along Iponan River (Iponan Section), Barangay Balulang, Cagayan de Oro City - Sta. 0 + 000 - Sta. 0 + 310","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-22","lat":8.418611,"lon":124.627777,"sm":284,"fm":284,"tm":null,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":6.37,"wp":[8.42892,124.57087],"wst":"matched","br":"Balulang","len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.62,"value":6.37,"text":"The title names Iponan, which OpenStreetMap maps through the stated municipality, but the pin is 6.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":239},{"i":8243,"cid":"22IF0056","pid":"P00630232VS","t":"Construction of Panalian Flood Control Structure (Downstream), Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":48999999.6,"abc":48999936.02,"fy":"2022","sd":"02/22/2022","cd":"2022-10-19","lat":10.981254,"lon":124.627969,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6489},{"i":8244,"cid":"23KH0026","pid":"P00721641MN","t":"Construction of Flood Control Works along Cagayan de Oro River Upper Balulang Section, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-11-27","lat":8.420833,"lon":124.628889,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.03,"wp":[8.42077,124.62912],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6490},{"i":8245,"cid":"23KH0035","pid":"P00721608MN","t":"Construction of New Drainage Line along Seriña St. from Villarin to Cagayan de Oro River (Outfall) Carmen, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/14/2023","cd":"2024-02-28","lat":8.481667,"lon":124.629444,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":1.17,"wp":[8.48107,124.64002],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6491},{"i":8246,"cid":"23KH0013","pid":"P00732482MN","t":"Construction of Drainage, Barangay Carmen, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"CAGALAWAN ENTERPRISES","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-12-26","lat":8.479444,"lon":124.629722,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carmen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6492},{"i":8247,"cid":"23K00102","pid":"P00721266MN","t":"Construction of Flood Control Project (Roa Crusher) along Upper Balulang Section 2, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":66022355.72,"abc":67375000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-09-01","lat":8.424869,"lon":124.629995,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6493},{"i":8248,"cid":"24K00054","pid":"P00820016MN","t":"Construction of Flood Control Structure (Roa Crusher) Upper Balulang Section 3, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":86096230.7,"abc":87863250.0,"fy":"2024","sd":"04/18/2024","cd":"2025-03-31","lat":8.425388,"lon":124.630041,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6494},{"i":8249,"cid":"23K00101","pid":"P00721265MN","t":"Construction of Flood Control Project (Roa Crusher) along Upper Balulang Section 1, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":66022344.63,"abc":67375000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-07-31","lat":8.423679,"lon":124.630068,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6495},{"i":8250,"cid":"21K00236","pid":"P00522054MN","t":"Construction of Cagayan de Oro Drainage System (Diversion Channel along Kauswagan - Bayabas Section) Package 5, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96258829.05,"abc":101325000.0,"fy":"2021","sd":"11/22/2021","cd":"2023-12-31","lat":8.502172,"lon":124.632486,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6496},{"i":8251,"cid":"23KH0006","pid":"P00732483MN","t":"Construction of Drainage, Barangay Kauswagan, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"JAMARI CONSTRUCTION (FORMERLY FRAE CONSTRUCTION) / ABAYCER CONSTRUCTION SUPPLIES AND GENERAL MERCHANDISE","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-11-16","lat":8.501944,"lon":124.6325,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kauswagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6497},{"i":8252,"cid":"22IH0010","pid":"P00620202VS","t":"Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"SAL CONSTRUCTION / CDU CONSTRUCTION","c":48989055.06,"abc":48999286.71,"fy":"2022","sd":"02/21/2022","cd":"2022-11-16","lat":12.508005,"lon":124.63305,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dalakit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6498},{"i":8253,"cid":"24IF0019","pid":"P00821063VS","t":"Construction of Drainage Structure, Brgy. Ipil, Ormoc City","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"MJR CONSTRUCTION FIRM AND GENERAL MAINTENANCE, OPC","c":5531661.85,"abc":5586000.0,"fy":"2024","sd":"02/08/2024","cd":"2024-06-21","lat":10.976342,"lon":124.633201,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ipil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6499},{"i":8254,"cid":"22KE0080","pid":"P00632307MN","t":"Construction of Slope Protection along Cross-Country Road, Catarman to Mambajao (Package 1), Catarman, Camiguin","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":96500000.0,"abc":96499999.99,"fy":"2022","sd":"06/29/2022","cd":"2024-09-01","lat":9.180599,"lon":124.634393,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6500},{"i":8255,"cid":"24IF0018","pid":"P00820911VS","t":"Construction of Donghol Flood Control Structure, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JM COLLERA KONSTRACT","c":96399999.99,"abc":96500000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-08-27","lat":11.040424,"lon":124.634911,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6501},{"i":8256,"cid":"23K00184","pid":"P00721426MN","t":"Construction of Cagayan de Oro River Basin, Barangay Macasandig, Package 2, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":81429903.46,"abc":82675000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-05-29","lat":8.457541,"lon":124.635569,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.14,"wp":[8.45735,124.6343],"wst":"matched","br":"Macasandig","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6502},{"i":8257,"cid":"25MG0034","pid":"P00920429MN","t":"Construction of Ala RIS Protection Works, Sto. Niño, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SANTO NIÑO (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"MFN BUILDERS","c":14689979.39,"abc":14700000.0,"fy":"2025","sd":"02/28/2025","cd":"2025-04-25","lat":6.436886,"lon":124.636327,"sm":1414,"fm":1414,"tm":1414,"am":1414,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6503},{"i":8258,"cid":"22KE0040","pid":"P00620134MN","t":"Construction of River Control/ Drainage System at Catibac Box Culvert, K47+000.00 - K47+212.50, K47+212.50 - K47+276.00, K47+212.50 - K47+231.50, K47.1+000 - K47.10+010.00, Catarman, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JAPUZ-JANSOL ENTERPRISES","c":19600000.0,"abc":19599985.51,"fy":"2022","sd":"05/12/2022","cd":"2022-11-27","lat":9.17545,"lon":124.63655,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6504},{"i":8259,"cid":"24ID0045","pid":"P00832682VS","t":"Construction of Flood Control Structure, Barangay Poblacion II, Capoocan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CAPOOCAN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"BEEROCK ENTERPRISES INCORPORATED","c":4849608.68,"abc":4899312.32,"fy":"2024","sd":"03/12/2024","cd":"2024-08-20","lat":11.294884,"lon":124.637612,"sm":328,"fm":328,"tm":328,"am":328,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6505},{"i":8260,"cid":"21K00235","pid":"P00522053MN","t":"Construction of Drainage System, Villarin - Lirio - Gemelina St., Carmen, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":102864606.3,"abc":106150000.0,"fy":"2021","sd":"11/22/2021","cd":"2024-03-25","lat":8.481624,"lon":124.639255,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6506},{"i":8261,"cid":"21MF0022","pid":"P00522377MN","t":"Construction of Flood Control Structure, Banga River (Baras Section), Tacurong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"City of Tacurong","deo":"Sultan Kudarat 1st District Engineering Office","co":"PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE)","c":47936892.16,"abc":48987968.9,"fy":"2021","sd":"03/28/2022","cd":"2022-11-13","lat":6.623761,"lon":124.639972,"sm":425,"fm":null,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.03,"wp":[6.62403,124.63996],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8275,8262],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0022 to 21MF0024) cover the same site, together worth PHP 144,885,010.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":569},{"i":8262,"cid":"21MF0024","pid":"P00522379MN","t":"Construction of Flood Control Structure, Banga River (Sampao Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Isulan","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / ALPXR CONST. & BLDRS. CORP","c":48934696.13,"abc":48980625.23,"fy":"2021","sd":"03/08/2021","cd":"2022-10-22","lat":6.587814,"lon":124.639972,"sm":653,"fm":null,"tm":653,"am":1023,"md":0.09,"ls":"boundary","ww":"Banga","wn":"Banga River","wd":0.42,"wp":[6.5882,124.64376],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8261,8275],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0022 to 21MF0024) cover the same site, together worth PHP 144,885,010.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":529},{"i":8263,"cid":"24KE0013","pid":"P00820060MN","t":"Construction of River Control along Timayog Bridge I Abutments, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":56153953.37,"abc":57899999.98,"fy":"2024","sd":"03/20/2024","cd":"2024-10-02","lat":9.157496,"lon":124.640862,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6507},{"i":8264,"cid":"23MF0015","pid":"P00721516MN","t":"Construction of Flood Control Structure, Banga River (Baras Section), Tacurong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"TACURONG CITY (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48999999.56,"abc":48882763.33,"fy":"2023","sd":"02/17/2023","cd":"2023-10-17","lat":6.621539,"lon":124.641381,"sm":425,"fm":425,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.62141,124.64129],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8239,8274],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23MF0015 to 23MF0017) cover the same site, together worth PHP 146,635,092.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":496},{"i":8265,"cid":"22KE0051","pid":"P00632310MN","t":"Construction of Slope Protection along Camiguin Circumferential Road, Lawigan,Catarman, Camiguin","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.","c":72210824.16,"abc":96499999.36,"fy":"2022","sd":"06/29/2022","cd":"2024-09-01","lat":9.167458,"lon":124.641735,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6508},{"i":8266,"cid":"24KD0040","pid":"P00821077MN","t":"Construction of Flood Control Structure Arroyo Creek, barangay 1, Cagayan de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"STA ANA RAYCON CORP.","c":9765203.1,"abc":9800000.0,"fy":"2024","sd":"04/10/2024","cd":"2024-08-26","lat":8.473973,"lon":124.641931,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Arroyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6509},{"i":8267,"cid":"22I00025","pid":"P00620282VS","t":"Construction of Catarman Flood Control Structure (Catarman River Basin), Package A, Brgy. Bangkerohan, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":104217207.7,"abc":104110916.9,"fy":"2022","sd":"02/28/2022","cd":"2022-11-24","lat":12.491243,"lon":124.642149,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Catarman","wn":"Catarman River","wd":0.45,"wp":[12.49334,124.64574],"wst":"matched","br":"Bangkerohan","len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6510},{"i":8268,"cid":"22KE0004","pid":"P00620132MN","t":"Construction of River Control, along Timayog Bridge II, K45 + 000 - K45 + 190, K45+209.50 - K45+388, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":49000000.0,"abc":48999939.14,"fy":"2022","sd":"05/12/2022","cd":"2023-01-29","lat":9.161248,"lon":124.642666,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6511},{"i":8269,"cid":"23IF0070","pid":"P00733320VS","t":"Construction of Flood Control, San Antonio Creek, Ormoc City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":48849298.66,"abc":49000000.0,"fy":"2023","sd":"04/20/2023","cd":"2023-10-16","lat":10.96637,"lon":124.642861,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":"San Antonio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6512},{"i":8270,"cid":"24K00061","pid":"P00820063MN","t":"Construction of Slope Protection, Cagayan de Oro Convention Center, Indahag, Cagayan de Oro City (Phase 1)","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":60252341.13,"abc":60909835.0,"fy":"2024","sd":"03/04/2024","cd":"2025-04-28","lat":8.4211,"lon":124.6431,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6513},{"i":8271,"cid":"22K00073","pid":"P00620025MN","t":"Construction of Drainage System (Bonbon - Kauswagan Section), Package 12, Sta. 0+000.00 - Sta. 1+536.00, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":134600733.3,"abc":140215465.0,"fy":"2022","sd":"06/29/2022","cd":"2024-08-18","lat":8.50994,"lon":124.64311,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":1536.0,"ph":"Package 12","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6514},{"i":8272,"cid":"22IH0026","pid":"P00620338VS","t":"Construction (Extension) of Catarman Flood Control Structures (Catarman River Basin), Brgy. Sampaguita, Jose Abad Santos, Baybay, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"SAL CONSTRUCTION / CDU CONSTRUCTION","c":42254877.86,"abc":42261925.59,"fy":"2022","sd":"02/21/2022","cd":"2022-11-18","lat":12.507134,"lon":124.643528,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Catarman","wn":"Catarman River","wd":0.31,"wp":[12.50491,124.6453],"wst":"matched","br":"Sampaguita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6515},{"i":8273,"cid":"24MF0023","pid":"P00820424MN","t":"Construction of Flood Control Structure, Banga River (Sampao Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY)","c":44859331.55,"abc":44959283.89,"fy":"2024","sd":"02/15/2024","cd":"2024-06-13","lat":6.594017,"lon":124.643686,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.59398,124.64387],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6516},{"i":8274,"cid":"23MF0017","pid":"P00721514MN","t":"Construction of Flood Control Structure, Banga River (Sampao Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48813031.51,"abc":48903080.69,"fy":"2023","sd":"02/17/2023","cd":"2023-08-23","lat":6.591103,"lon":124.643739,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.59102,124.64394],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8264,8239],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23MF0015 to 23MF0017) cover the same site, together worth PHP 146,635,092.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":530},{"i":8275,"cid":"21MF0023","pid":"P00522378MN","t":"Construction of Flood Control Structure, Banga River (Rajah Muda Section), Tacurong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"City of Tacurong","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":48013421.57,"abc":48993287.32,"fy":"2021","sd":"03/28/2022","cd":"2022-11-03","lat":6.589322,"lon":124.643831,"sm":425,"fm":null,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.58933,124.64368],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[8261,8262],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0022 to 21MF0024) cover the same site, together worth PHP 144,885,010.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":570},{"i":8276,"cid":"24MG0066","pid":"P00820354MN","t":"Construction of River Bank Protection along Banga River, Barangay Matapol, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":39510024.3,"abc":39565000.0,"fy":"2024","sd":"05/15/2024","cd":"2024-09-27","lat":6.5869,"lon":124.64496,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.58701,124.64505],"wst":"matched","br":"Matapol","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6517},{"i":8277,"cid":"23I00002","pid":"P00721800VS","t":"Construction of Catarman Flood Control structure, Catarman River Basin, Barangay Macagtas-Ipil-Ipil Section, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":110865287.6,"abc":221949552.3,"fy":"2023","sd":"03/15/2023","cd":"2023-12-15","lat":12.491692,"lon":124.646274,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Catarman","wn":"Catarman River","wd":0.13,"wp":[12.49276,124.64682],"wst":"matched","br":"Macagtas-Ipil-Ipil Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6518},{"i":8278,"cid":"22I00024","pid":"P00620286VS","t":"Construction/Extension of Catarman Flood Control Structure (Catarman River Basin), Brgy. Macagtas-Brgy. Ipil-Ipil Section, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":96498826.48,"abc":96397878.94,"fy":"2022","sd":"02/28/2022","cd":"2023-04-04","lat":12.491243,"lon":124.647256,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Catarman","wn":"Catarman River","wd":0.13,"wp":[12.49228,124.64779],"wst":"matched","br":"Macagtas-Brgy. Ipil-Ipil Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6519},{"i":8279,"cid":"23I00002","pid":"P00721801VS","t":"Construction of Catarman Flood Control Structure, (Catarman River Basin), Barangay Bangkerohan, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":110859141.8,"abc":221949552.3,"fy":"2023","sd":"03/15/2023","cd":"2023-12-15","lat":12.492881,"lon":124.64987,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Catarman","wn":"Catarman River","wd":0.14,"wp":[12.49171,124.6495],"wst":"matched","br":"Bangkerohan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6520},{"i":8280,"cid":"24KC0030","pid":"P00820144MN","t":"Construction of Flood Mitigation Structure along Barandias-Dominorog Rd (Upstream) of Dominorog Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":30380000.0,"abc":30380000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-13","lat":7.91039,"lon":124.651424,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6521},{"i":8281,"cid":"21K00241","pid":"P00522073MN","t":"Construction of Rectangular Open Channel along Bitan-ag Creek (Rectangular Open Channel - 5m x 2m), Package 1, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":84440279.13,"abc":88912205.0,"fy":"2021","sd":"07/29/2021","cd":"2024-04-21","lat":8.483182,"lon":124.651605,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Rectangular Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6522},{"i":8282,"cid":"24KC0018","pid":"P00820143MN","t":"Construction of Flood Mitigation Structure along Barandias-Dominorog Rd (Downstream) of Dominorog Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2025-01-20","lat":7.909246,"lon":124.65178,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6523},{"i":8283,"cid":"21K00240","pid":"P00522074MN","t":"Construction of Rectangular Open Channel along Tributary Creek (Rectangular Open Channel - 6m x 2.5m), Package 1, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":91654271.43,"abc":96500000.0,"fy":"2021","sd":"07/28/2021","cd":"2024-03-25","lat":8.483487,"lon":124.65179,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Rectangular Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6524},{"i":8284,"cid":"23KC0017","pid":"P00721370MN","t":"Construction of Flood Mitigation Structure along Barandias-Dominorog Rd (Upstream) of Dominorog Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":7448000.0,"abc":7448000.0,"fy":"2023","sd":"02/27/2023","cd":"2023-06-22","lat":7.91077,"lon":124.65198,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6525},{"i":8285,"cid":"22IJ0027","pid":"P00630241VS","t":"Construction of Slope Protection Structure along Brgy. Alibaba to Brgy. San Jose, Calbayog City, Samar","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":19497944.21,"abc":19600000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-11-05","lat":12.130301,"lon":124.652313,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alibaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6526},{"i":8286,"cid":"22K00259","pid":"P00620053MN","t":"Rehabilitation of Tributary Channel (Upstream Area), Package 25, Incl. Channelization, Sta. 0+000.00 - Sta. 0+420.996 (Alignment 1), Sta. 0+000.00 - Sta. 0+115.410 (Alignment 2), Sta. 0+868.400 - Sta. 1+103.000 (Alignment 3), Sta. 0+000.00 - Sta. 0+083.220 (Alignment 4), Cagayan de Oro City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":112325644.9,"abc":115800000.0,"fy":"2022","sd":"06/29/2022","cd":"2024-03-25","lat":8.478375,"lon":124.656404,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":854.2,"ph":"Package 25","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6527},{"i":8287,"cid":"22K00260","pid":"P00620046MN","t":"Rehabilitation of Bitan-Ag Creek (Upstream Section), Incl. Channelization, Package 18, Sta. 0+668.30 - Sta. 0+868.400, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":97194243.34,"abc":98752310.0,"fy":"2022","sd":"06/29/2022","cd":"2024-03-25","lat":8.49218,"lon":124.65647,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Bitan-Ag","wn":"Bitan-ag Creek","wd":0.14,"wp":[8.49089,124.65656],"wst":"matched","br":null,"len":200.1,"ph":"Package 18","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6528},{"i":8288,"cid":"21K00238","pid":"P00522077MN","t":"Rehabilitation of Bitan-ag Creek including Channelization, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"SUPREA PHILS. DEVELOPMENT CORP. / VEN RAY CONSTRUCTION CORPORATION","c":91435385.09,"abc":96500000.0,"fy":"2021","sd":"08/16/2021","cd":"2024-04-21","lat":8.48462,"lon":124.656567,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Bitan-ag","wn":"Bitan-ag Creek","wd":0.09,"wp":[8.48417,124.65594],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6529},{"i":8289,"cid":"24M00096","pid":"P00833596MN","t":"Construction of Box Culvert, Barangay Malagap, Banisilan, Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"BANISILAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":4949997.25,"abc":4950000.0,"fy":"2024","sd":"09/17/2024","cd":"2025-01-27","lat":7.389972,"lon":124.658127,"sm":153,"fm":153,"tm":153,"am":153,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malagap","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6530},{"i":8290,"cid":"22K00261","pid":"P00620047MN","t":"Rehabilitation of Flood Control Structure, Bitan-ag Creek (Upstream Section), Package 19, Sta. 0+456.70 - Sta. 0+668.30, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":102965502.4,"abc":106150000.0,"fy":"2022","sd":"06/27/2022","cd":"2024-03-25","lat":8.491174,"lon":124.6582,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Bitan-ag","wn":"Bitan-ag Creek","wd":0.12,"wp":[8.49015,124.65789],"wst":"matched","br":null,"len":211.6,"ph":"Package 19","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6531},{"i":8291,"cid":"22IF0086","pid":"P00642534VS","t":"Rehabilitation of Spillway, Brgy. Can-untog, Ormoc City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":38599979.26,"abc":38600000.0,"fy":"2022","sd":"05/23/2022","cd":"2022-11-07","lat":10.98802,"lon":124.659614,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Can-untog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6532},{"i":8292,"cid":"22KE0041","pid":"P00620136MN","t":"Construction of River Control/ Drainage System at Yumbing Box Culvert, K57+300 - K57+506, Mambajao, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JANRHYLL CONSTRUCTION","c":19600000.0,"abc":19599999.96,"fy":"2022","sd":"05/12/2022","cd":"2023-04-23","lat":9.239575,"lon":124.659647,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6533},{"i":8293,"cid":"24MG0063","pid":"P00821096MN","t":"Construction of River Bank Protection Along Banga River, Brgy. Simsiman, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC.","c":38420216.71,"abc":39201960.0,"fy":"2024","sd":"05/10/2024","cd":"2024-10-12","lat":6.56847,"lon":124.65985,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"River Bank Protection Along Banga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Simsiman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6534},{"i":8294,"cid":"21K00239","pid":"P00522075MN","t":"Construction of Single Barrel Diversion Drainage Line Connecting the Existing Bitan-ag Channel at LKKS to Diversion Drainage Line along BCIR and Agora Terminal Road, Lapasan, C.M. Recto - Limketkai Section, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":114875026.6,"abc":121015825.0,"fy":"2021","sd":"08/16/2021","cd":"2024-03-25","lat":8.48388,"lon":124.6599,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Existing Bitan-ag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6535},{"i":8295,"cid":"22K00263","pid":"P00620049MN","t":"Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 13, Sta. 0+226.00 - Sta. 0+456.70, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":114009217.0,"abc":115800000.0,"fy":"2022","sd":"06/29/2022","cd":"2024-03-25","lat":8.49058,"lon":124.66016,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Bitan-Ag","wn":"Bitan-ag Creek","wd":0.12,"wp":[8.48957,124.65985],"wst":"matched","br":null,"len":230.7,"ph":"Package 13","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6536},{"i":8296,"cid":"23IF0012","pid":"P00721576VS","t":"Construction of Panilahan Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"REX E. MORALES CONSTRUCTION","c":57696132.04,"abc":57900000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-10-29","lat":10.95698,"lon":124.660262,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6537},{"i":8297,"cid":"22K00262","pid":"P00620048MN","t":"Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 12, Sta. 0+000.00 - Sta. 0+226.00, Downstream Section, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":114013627.6,"abc":115800000.0,"fy":"2022","sd":"06/06/2022","cd":"2024-03-25","lat":8.48999,"lon":124.66217,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Bitan-Ag","wn":"Bitan-ag Creek","wd":0.09,"wp":[8.48918,124.66217],"wst":"matched","br":null,"len":226.0,"ph":"Package 12","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6538},{"i":8298,"cid":"22IH0109","pid":"P00632044VS","t":"Construction of Drainage Canal, Brgy UEP Zone II, Catarman Northern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"RL TUBA CIVIL ENGINEERING CONSTRUCTION","c":4887350.18,"abc":4949562.2,"fy":"2022","sd":"03/31/2022","cd":"2022-09-19","lat":12.511836,"lon":124.662319,"sm":352,"fm":352,"tm":null,"am":352,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"UEP Zone II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6539},{"i":8299,"cid":"24MG0067","pid":"P00820355MN","t":"Construction of River Bank Protection along Banga River, Barangay Simsiman, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":39564960.1,"abc":39565000.0,"fy":"2024","sd":"05/10/2024","cd":"2024-09-24","lat":6.56755,"lon":124.6634,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.07,"wp":[6.56814,124.66332],"wst":"matched","br":"Simsiman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6540},{"i":8300,"cid":"22KE0039","pid":"P00620133MN","t":"Construction of River Control/ Drainage System at Agoho Box Culvert, K58+600 - K59+020, Mambajao, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":18718516.34,"abc":19599998.92,"fy":"2022","sd":"02/15/2022","cd":"2022-08-30","lat":9.24531,"lon":124.667935,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6541},{"i":8301,"cid":"23KE0036","pid":"P00721250MN","t":"Construction of Dinangasan River Control, Package 1, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":115689618.4,"abc":115800000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-07-23","lat":9.131128,"lon":124.668206,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":"Dinangasan","wn":"Dinangasan River","wd":0.1,"wp":[9.13116,124.6673],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6542},{"i":8302,"cid":"22KE0037","pid":"P00620129MN","t":"Construction of Dinangasan River Control, K 40.41 + 805 - K 40.42 + 041.50, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":29400000.0,"abc":29399999.86,"fy":"2022","sd":"05/12/2022","cd":"2023-03-25","lat":9.14052,"lon":124.6687,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":"Dinangasan","wn":"Dinangasan River","wd":0.03,"wp":[9.14041,124.66891],"wst":"matched","br":null,"len":null,"ph":null,"dup":[8303],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 95,846,315.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1006},{"i":8303,"cid":"22KE0011","pid":"P00620024MN","t":"Construction of Dinangasan River Control, Package 2, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":66446314.65,"abc":69577464.39,"fy":"2022","sd":"02/24/2022","cd":"2023-01-29","lat":9.14052,"lon":124.668703,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":"Dinangasan","wn":"Dinangasan River","wd":0.03,"wp":[9.14041,124.66892],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[8302],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 95,846,315.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":860},{"i":8304,"cid":"23MG0011","pid":"P00721512MN","t":"Construction of Flood Control Structure along Ala River, Purok Santa Cecilla, Zone II, Barangay Poblacion, Santo Niño, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SANTO NIÑO (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION / MEGALINE BUILDERS AND SUPPLY","c":45079806.32,"abc":45080000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-09-28","lat":6.42769,"lon":124.66894,"sm":1414,"fm":1414,"tm":1414,"am":1414,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6543},{"i":8305,"cid":"24IF0061","pid":"P00820883VS","t":"Construction of Benolho Flood Control Structure (Upstream), Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) / EVERBUILT CONSTRUCTION","c":96399778.3,"abc":96500000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-10-18","lat":10.948781,"lon":124.669346,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6544},{"i":8306,"cid":"22K00368","pid":"P00620050MN","t":"Rehabilitation of Flood Control Structure, Kolambog Creek, Package 27, Sta. 0+000.00 - Sta. 0+787.562, Sta. 1+113.581 - Sta. 1+173.794, Lapasan, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":112903335.6,"abc":115800000.0,"fy":"2022","sd":"08/08/2022","cd":"2024-03-25","lat":8.482003,"lon":124.67056,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Kolambog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":847.8,"ph":"Package 27","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6545},{"i":8307,"cid":"23MF0028","pid":"P00732501MN","t":"Construction of Drainage System, Barangay Poblacion, Tacurong, Sultan Kudarat","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"TACURONG CITY (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"C.A. BETALAC CONSTRUCTION & GEN. MDSE., INC. (FOR: C.A. BETALAC CONSTRUCTION & GEN. MDSE.)","c":14585227.83,"abc":14606042.29,"fy":"2023","sd":"02/27/2023","cd":"2023-11-19","lat":6.695353,"lon":124.670794,"sm":425,"fm":425,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6546},{"i":8308,"cid":"24ME0092","pid":"P00835804MN","t":"Construction of Flood Mitigation Structure along Tambilil River, Kiamba, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":86846157.23,"abc":86850000.0,"fy":"2024","sd":"05/02/2024","cd":"2024-11-12","lat":5.979767,"lon":124.672033,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":"Tambilil","wn":"Tambilil River","wd":0.01,"wp":[5.97973,124.67207],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6547},{"i":8309,"cid":"23KE0047","pid":"P00734023MN","t":"Construction of Protection Wall, Barangay Poblacion, Municipality of Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"FNTC CONSTRUCTION","c":23763961.24,"abc":24499999.79,"fy":"2023","sd":"04/28/2023","cd":"2023-11-25","lat":9.126933,"lon":124.672211,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6548},{"i":8310,"cid":"22MF0057","pid":"P00634146MN","t":"Construction of Drainage Canal, Brgy. Poblacion, Tacurong City, Sultan Kudarat","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"TACURONG CITY (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"BEMA CONSTRUCTION AND GENERAL MERCHANDISE","c":4932515.0,"abc":4937515.81,"fy":"2022","sd":"06/08/2022","cd":"2022-07-26","lat":6.696128,"lon":124.672705,"sm":425,"fm":425,"tm":425,"am":425,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6549},{"i":8311,"cid":"23IJ0054","pid":"P00733762VS","t":"Rehabilitation of Seawall, Brgy. Napalisan, Gandara, Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JUPA CONSTRUCTION","c":48489599.83,"abc":48510000.0,"fy":"2023","sd":"05/31/2023","cd":"2024-02-19","lat":11.98399,"lon":124.6734,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Napalisan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6550},{"i":8312,"cid":"24MD0017","pid":"P00833594MN","t":"Construction of Drainage, Calawag Creek, Poblacion, Pikit, Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIKIT (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":4900000.0,"abc":4950000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-04-29","lat":7.055542,"lon":124.674862,"sm":1128,"fm":1128,"tm":1128,"am":1128,"md":0.0,"ls":"inside","ww":"Calawag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6551},{"i":8313,"cid":"23MD0041","pid":"P00732493MN","t":"Construction of Drainage Canal, Poblacion - Calawag Creek, Pikit, North Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIKIT (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":4900499.99,"abc":4950000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-07-31","lat":7.055561,"lon":124.674865,"sm":1128,"fm":1128,"tm":1128,"am":1128,"md":0.0,"ls":"inside","ww":"Calawag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6552},{"i":8314,"cid":"22M00117","pid":"P00633903MN","t":"Construction of Flood Control Structure, Calean, Mangudadatu, Maguindanao","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL SUR","mu":"MANGUDADATU (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / RNS CONSTRUCTION ENGINEERING","c":95999761.1,"abc":96499768.8,"fy":"2022","sd":"08/15/2022","cd":"2023-07-31","lat":6.660643,"lon":124.677356,"sm":918,"fm":918,"tm":918,"am":425,"md":11.0,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":54,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.0,"text":"The pin is 11.0 km outside Mangudadatu, Maguindanao, the nearest municipality the record claims. It falls in City of Tacurong, Sultan Kudarat.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":152},{"i":8315,"cid":"22KE0034","pid":"P00620126MN","t":"Construction of Alga River Control along Alga Bridge, K38.6+000.00 - K38.6+053.00, K38.60+000 - K38.60+K160.00, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JAPUZ-JANSOL ENTERPRISES","c":19034974.8,"abc":19599999.99,"fy":"2022","sd":"05/12/2022","cd":"2022-11-27","lat":9.11899,"lon":124.68024,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":"Alga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6553},{"i":8316,"cid":"24MG0065","pid":"P00820353MN","t":"Construction of River Bank Protection along Banga River, Barangay Dumaguil, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS","c":29785008.72,"abc":29915000.0,"fy":"2024","sd":"05/10/2024","cd":"2024-09-11","lat":6.55105,"lon":124.68126,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.55125,124.68127],"wst":"matched","br":"Dumaguil","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6554},{"i":8317,"cid":"23MG0034","pid":"P00732168MN","t":"Construction of River Bank Protection along Banga River, Brgy. Kibid, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":24495251.86,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-07","lat":6.550739,"lon":124.683728,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.01,"wp":[6.55081,124.68375],"wst":"matched","br":"Kibid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6555},{"i":8318,"cid":"23MG0014","pid":"P00732165MN","t":"Construction of River Bank Protection along Ala River, Brgy. Ambalgan, Sto. Niño, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SANTO NIÑO (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":29399875.1,"abc":29400000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-10-06","lat":6.41123,"lon":124.685093,"sm":1414,"fm":1414,"tm":1414,"am":1414,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ambalgan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6556},{"i":8319,"cid":"22MG0006","pid":"P00630624MN","t":"Construction of Riverbank Protection along Banga River, Brgy. Kibid, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"NIRVANA CONSTRUCTION & SUPPLIES / FFJJ CONSTRUCTION","c":48999928.43,"abc":98000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-07","lat":6.543611,"lon":124.685833,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.09,"wp":[6.5437,124.68663],"wst":"matched","br":"Kibid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6557},{"i":8320,"cid":"23M00074","pid":"P00721466MN","t":"Construction of River Bank Protection along Banga River, Dumaguil Bridge Section, Barangay Dumaguil Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":67549845.83,"abc":67550000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-03-18","lat":6.548333,"lon":124.686389,"sm":1023,"fm":1023,"tm":null,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.02,"wp":[6.54832,124.68619],"wst":"matched","br":"Dumaguil Norala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6558},{"i":8321,"cid":"23IF0005","pid":"P00721577VS","t":"Construction of Talisayan Flood Control, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) / EVERBUILT CONSTRUCTION","c":55003847.3,"abc":55005000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-10-25","lat":10.934007,"lon":124.68916,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6559},{"i":8322,"cid":"24IF0066","pid":"P00834628VS","t":"Construction of Seawall, barangay Poblacion, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JM COLLERA KONSTRACT","c":96399999.99,"abc":96500000.0,"fy":"2024","sd":"05/15/2024","cd":"2024-12-16","lat":10.920176,"lon":124.691315,"sm":22,"fm":22,"tm":22,"am":22,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6560},{"i":8323,"cid":"24KE0018","pid":"P00820402MN","t":"Construction of River Control along Tangaro, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":19006200.13,"abc":19599999.81,"fy":"2024","sd":"02/15/2024","cd":"2024-04-16","lat":9.113838,"lon":124.691493,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6561},{"i":8324,"cid":"22KE0006","pid":"P00620041MN","t":"Construction of River Control/ Drainage System at Tangaro Box Culvert, K38+000.00 - K39+220.00, Catarman, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":92157449.61,"abc":96499947.24,"fy":"2022","sd":"02/15/2022","cd":"2022-11-27","lat":9.1143,"lon":124.69174,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6562},{"i":8325,"cid":"24KE0051","pid":"P00821083MN","t":"Construction of River Control along Baylao Box Culvert, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"FNTC CONSTRUCTION","c":28809594.6,"abc":29399999.19,"fy":"2024","sd":"05/16/2024","cd":"2025-02-23","lat":9.249268,"lon":124.693339,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6563},{"i":8326,"cid":"24MG0064","pid":"P00820352MN","t":"Construction of River Bank Protection along Ala River, Barangay Talahik, Surallah, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SURALLAH (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"VERGUZ CONSTRUCTION","c":29539716.7,"abc":29915000.0,"fy":"2024","sd":"05/15/2024","cd":"2024-08-22","lat":6.39885,"lon":124.69603,"sm":1496,"fm":1496,"tm":1496,"am":1496,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Talahik","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6564},{"i":8327,"cid":"23M00231","pid":"P00734380MN","t":"Construction of River Bank Protection along Ala River, Brgy. Dajay, Surallah, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SURALLAH (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":83327324.86,"abc":310576313.2,"fy":"2023","sd":"08/30/2023","cd":"2024-04-11","lat":6.391971,"lon":124.697091,"sm":1496,"fm":1496,"tm":1496,"am":1496,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dajay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6565},{"i":8328,"cid":"24MF0015","pid":"P00820416MN","t":"Construction of Flood Control Structure, Ala River (Allah Bridge - Mapantig), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":44960045.66,"abc":45005247.52,"fy":"2024","sd":"02/15/2024","cd":"2024-05-20","lat":6.675597,"lon":124.56825,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8647,8858,8442,8447,8583,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":593},{"i":8329,"cid":"24IC0034","pid":"P00832680VS","t":"Construction of Flood Control Structure along Busay River, Barangay District III, Babatngon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"GO_SOLID BUILDERS INC.","c":49458786.62,"abc":49500000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-08-19","lat":11.41276,"lon":124.8461,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":"Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"District III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6566},{"i":8330,"cid":"24KE0090","pid":"P00820910MN","t":"Construction of River Control along Bugang Bridge, Sagay, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"SAGAY (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JAPUZ-JANSOL ENTERPRISES","c":94561570.35,"abc":96499997.86,"fy":"2024","sd":"06/18/2024","cd":"2025-02-23","lat":9.111125,"lon":124.700779,"sm":1232,"fm":1232,"tm":1232,"am":1232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6567},{"i":8331,"cid":"23KE0007","pid":"P00721374MN","t":"Construction of River Control along Lumad Bridge, Barangay Lumad, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":48913540.2,"abc":48999999.24,"fy":"2023","sd":"02/27/2023","cd":"2023-10-24","lat":9.241025,"lon":124.701313,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lumad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6568},{"i":8332,"cid":"23IM0077","pid":"P00721617VS","t":"Construction of Flood Control Structure, Barangay Palanog waterway, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"COLLERA CONSTRUCTION","c":110859451.4,"abc":110971687.6,"fy":"2023","sd":"06/19/2023","cd":"2024-03-18","lat":11.25333,"lon":124.945884,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palanog waterway","len":null,"ph":null,"dup":[8238],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 159,787,286.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":698},{"i":8333,"cid":"22FH0011","pid":"P00631449LZ","t":"Construction of Pandan Breakwater, Pandan, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"PANDAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":48753545.92,"abc":48998759.4,"fy":"2022","sd":"03/02/2022","cd":"2022-12-16","lat":14.051338,"lon":124.166745,"sm":1082,"fm":1082,"tm":1082,"am":1082,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6569},{"i":8334,"cid":"22MG0021","pid":"P00630614MN","t":"Construction of Flood Control Structure along Bolok Creek, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":29398305.78,"abc":58800000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-03","lat":6.503611,"lon":124.846111,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Bolok","wn":"B'lok Creek","wd":0.21,"wp":[6.50427,124.84436],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6570},{"i":8335,"cid":"22HC0089","pid":"P00630189VS","t":"Construction of Flood Control Structure, Poblacion, Trinidad, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"TRINIDAD (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":66564785.83,"abc":66585000.0,"fy":"2022","sd":"04/04/2022","cd":"2023-04-10","lat":10.081138,"lon":124.347808,"sm":1585,"fm":1585,"tm":1585,"am":1585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6571},{"i":8336,"cid":"23KK0113","pid":"P00734371MN","t":"Construction of Flood Control Project along Dangoan Br. 1 River (Downstream), Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":74250000.0,"abc":73500000.0,"fy":"2023","sd":"04/25/2023","cd":"2023-10-03","lat":8.91017,"lon":125.01125,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8222,8236],"run":[],"cl":[],"L":"field","s":51,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 2 of them funded in the same year. Combined value at this pin: PHP 195,625,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":102},{"i":8337,"cid":"22IF0019","pid":"P00620194VS","t":"Construction of Natubgan Flood Control (Upstream Left Side), Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48999997.17,"abc":48999756.46,"fy":"2022","sd":"02/21/2022","cd":"2022-12-17","lat":11.191028,"lon":124.568262,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6572},{"i":8338,"cid":"22KE0036","pid":"P00620128MN","t":"Construction of Baylao River Control, K 62.6 + 778 - K 62.61 + 100, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":28079386.5,"abc":29399921.44,"fy":"2022","sd":"02/15/2022","cd":"2022-10-01","lat":9.25049,"lon":124.70236,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":"Baylao","wn":"Baylao River","wd":0.0,"wp":[9.25049,124.70235],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6573},{"i":8339,"cid":"23IM0055","pid":"P00721618VS","t":"Construction of Flood Control Structure, Suhi River, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JGO BUILDERS","c":33650737.08,"abc":33773462.79,"fy":"2023","sd":"04/05/2023","cd":"2023-10-25","lat":11.320099,"lon":124.946106,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Suhi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6574},{"i":8340,"cid":"21FH0094","pid":"P00526240LZ","t":"Construction of Flood Control Structure, Poblacion, Pandan, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"Pandan","deo":"Catanduanes District Engineering Office","co":"ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR","c":44098760.0,"abc":44098759.15,"fy":"2021","sd":"01/17/2022","cd":"2022-08-17","lat":14.050744,"lon":124.168442,"sm":1082,"fm":null,"tm":1082,"am":1082,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6575},{"i":8341,"cid":"22FH0022","pid":"P00631450LZ","t":"Construction of Pandan River Control, Pandan, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"PANDAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":48998740.17,"abc":48999999.74,"fy":"2022","sd":"03/02/2022","cd":"2022-10-13","lat":14.04754,"lon":124.173072,"sm":1082,"fm":1082,"tm":1082,"am":1082,"md":0.0,"ls":"inside","ww":"Pandan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6576},{"i":8342,"cid":"22FH0098","pid":"P00640583LZ","t":"Construction (Completion) of Flood Control, Pandan River,  Libod, Pandan, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"PANDAN (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"FDS CONSTRUCTION & SUPPLY","c":2970000.0,"abc":2970000.0,"fy":"2022","sd":"07/22/2022","cd":"2022-09-04","lat":14.047564,"lon":124.173072,"sm":1082,"fm":1082,"tm":1082,"am":1082,"md":0.0,"ls":"inside","ww":"Pandan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6577},{"i":8343,"cid":"24HC0020","pid":"P00820179VS","t":"Construction of Flood Mitigation Structure, Calunasan Bridge Flood Control, Getafe, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GETAFE (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48403180.0,"abc":48403180.0,"fy":"2024","sd":"03/07/2024","cd":"2025-03-02","lat":10.138493,"lon":124.17466,"sm":581,"fm":581,"tm":581,"am":581,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6578},{"i":8344,"cid":"22FL0021","pid":"P00631477LZ","t":"Construction of Seawall Protection of Barangay Lupi, Prieto-Diaz, Sorsogon","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"SORSOGON","mu":"PRIETO DIAZ (SORSOGON)","deo":"Sorsogon 2nd District Engineering Office","co":"MUNTOPAR BUILDERS CORP.","c":28518000.0,"abc":58800000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-09-04","lat":13.067158,"lon":124.181157,"sm":1175,"fm":1175,"tm":1175,"am":1175,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lupi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6579},{"i":8345,"cid":"24HC0040","pid":"P00820180VS","t":"Construction of Flood Mitigation Structure, Salog Bridge Flood Control, Getafe, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GETAFE (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48403180.0,"abc":48403180.0,"fy":"2024","sd":"03/07/2024","cd":"2025-01-10","lat":10.135737,"lon":124.184987,"sm":581,"fm":581,"tm":581,"am":581,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6580},{"i":8346,"cid":"22FH0049","pid":"P00631448LZ","t":"Construction of Pajo River Control, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":48998760.0,"abc":48999999.86,"fy":"2022","sd":"03/02/2022","cd":"2022-08-16","lat":13.589505,"lon":124.186192,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":"Pajo","wn":"Pajo River","wd":0.04,"wp":[13.58955,124.1858],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6581},{"i":8347,"cid":"22KF0056","pid":"P00620139MN","t":"Construction of Flood Control Structure along Agus River, Package 1, Brgy. Buru-un, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-30","lat":8.19751,"lon":124.18838,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Agus","wn":"Agus River","wd":0.13,"wp":[8.19696,124.18941],"wst":"matched","br":"Buru-un","len":null,"ph":"Package 1","dup":[],"run":[8348,8349,8350],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22KF0056 to 22KF0059) cover the same site, together worth PHP 134,920,520.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":623},{"i":8348,"cid":"22KF0057","pid":"P00620140MN","t":"Construction of Flood Control Structure along Agus River, Package 2, Brgy. Buru-un, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-05-12","lat":8.19572,"lon":124.18933,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Agus","wn":"Agus River","wd":0.03,"wp":[8.19577,124.18962],"wst":"matched","br":"Buru-un","len":null,"ph":"Package 2","dup":[],"run":[8347,8349,8350],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22KF0056 to 22KF0059) cover the same site, together worth PHP 134,920,520.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":624},{"i":8349,"cid":"22KF0058","pid":"P00620141MN","t":"Construction of Flood Control Structure along Agus River, Package 3, Brgy. Buru-un, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":34300000.0,"abc":34300000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-30","lat":8.19686,"lon":124.18985,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Agus","wn":"Agus River","wd":0.05,"wp":[8.19678,124.18944],"wst":"matched","br":"Buru-un","len":null,"ph":"Package 3","dup":[],"run":[8347,8348,8350],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22KF0056 to 22KF0059) cover the same site, together worth PHP 134,920,520.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":625},{"i":8350,"cid":"22KF0059","pid":"P00620142MN","t":"Construction of Flood Control Structure along Agus River, Package 4, Brgy. Buru-un, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":32020520.0,"abc":32020520.0,"fy":"2022","sd":"03/18/2022","cd":"2023-05-06","lat":8.19607,"lon":124.19011,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Agus","wn":"Agus River","wd":0.06,"wp":[8.19597,124.18959],"wst":"matched","br":"Buru-un","len":null,"ph":"Package 4","dup":[],"run":[8347,8348,8349],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22KF0056 to 22KF0059) cover the same site, together worth PHP 134,920,520.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":626},{"i":8351,"cid":"22MH0022","pid":"P00620092MN","t":"Construction of River Bank Protection at Brgy. Baranayan, Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"PALIMBANG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / CBC SQUARE BUILDERS CO.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-05-15","lat":6.20635,"lon":124.191139,"sm":1069,"fm":1069,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baranayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6582},{"i":8352,"cid":"24MH0019","pid":"P00820207MN","t":"Construction of Malalag CIS Protection Dike, Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"PALIMBANG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":21174615.0,"abc":22050000.0,"fy":"2024","sd":"03/25/2024","cd":"2024-08-16","lat":6.233333,"lon":124.193611,"sm":1069,"fm":1069,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6583},{"i":8353,"cid":"22FH0034","pid":"P00631443LZ","t":"Construction of Flood Control Structure, Barangay Pajo San Isidro, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":39198663.99,"abc":39200000.0,"fy":"2022","sd":"03/02/2022","cd":"2023-03-01","lat":13.563872,"lon":124.198047,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pajo San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6584},{"i":8354,"cid":"22MH0025","pid":"P00620095MN","t":"Construction of River Bank Protection/Flood Control at Brgy Badiangon, Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"PALIMBANG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-01","lat":6.220756,"lon":124.198147,"sm":1069,"fm":1069,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Badiangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6585},{"i":8355,"cid":"23MH0017","pid":"P00721316MN","t":"Construction of River Bank Protection/Flood Control at Barangay Badiangon (Downstream), Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"PALIMBANG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":84919952.15,"abc":84920000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-08-01","lat":6.219131,"lon":124.198955,"sm":1069,"fm":1069,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Badiangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6586},{"i":8356,"cid":"22MH0023","pid":"P00620093MN","t":"Construction of River Bank Protection at Brgy. Lupoken, Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"BAGUMBAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":96499932.16,"abc":96500000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-01","lat":6.197478,"lon":124.208231,"sm":1069,"fm":112,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lupoken","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":28,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":27.72,"text":"The record contradicts itself: the title and the pin point to Palimbang, Sultan Kudarat, but the municipality field names Bagumbayan, Sultan Kudarat, 28 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":465},{"i":8357,"cid":"23MH0016","pid":"P00721393MN","t":"Construction of River Bank Protection at Barangay Baranayan, Palimbang, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"PALIMBANG (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":48999998.56,"abc":49000000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-01","lat":6.197772,"lon":124.208274,"sm":1069,"fm":1069,"tm":1069,"am":1069,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baranayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6587},{"i":8358,"cid":"22FH0057","pid":"P00631442LZ","t":"Construction of Flood Control Structure at Barangay Sogod Tibgao to Barangay Danicop to Barangay San Roque, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"EMSYM CONSTRUCTION CORP. / NQA CONSTRUCTION & SUPPLY","c":48998759.81,"abc":49000000.0,"fy":"2022","sd":"03/22/2022","cd":"2022-12-03","lat":13.590124,"lon":124.222728,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sogod Tibgao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6588},{"i":8359,"cid":"22FH0017","pid":"P00631439LZ","t":"Construction of Breakwater, Palnab, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NIDA BUILDER'S & SUPPLIES","c":29395380.35,"abc":29398758.98,"fy":"2022","sd":"03/02/2022","cd":"2022-09-29","lat":13.569356,"lon":124.224487,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6589},{"i":8360,"cid":"22FH0067","pid":"P00640584LZ","t":"Construction of Breakwater Phase 2, Palnab, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":29399911.31,"abc":29399999.48,"fy":"2022","sd":"04/12/2022","cd":"2022-11-12","lat":13.569436,"lon":124.224685,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6590},{"i":8361,"cid":"23HC0036","pid":"P00721816VS","t":"Construction of Flood Mitigation Structure, Katubuan Bridge River Control, Dagohoy, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DAGOHOY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48997618.15,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2024-06-03","lat":9.908624,"lon":124.226248,"sm":473,"fm":473,"tm":473,"am":473,"md":0.0,"ls":"inside","ww":"Katubuan Bridge","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6591},{"i":8362,"cid":"22M00023","pid":"P00620247MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase IV), Datu Odin Sinsuat, Maguindanao","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"DCD BUILDERS & ENTERPISES / CORICS CONSTRUCTION","c":80448703.76,"abc":81250779.4,"fy":"2022","sd":"10/12/2022","cd":"2023-12-27","lat":7.17266,"lon":124.23129,"sm":492,"fm":494,"tm":492,"am":492,"md":0.0,"ls":"inside","ww":"Tamontaka-Capiton-Tanuel","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":24.05,"text":"The record contradicts itself: the title and the pin point to Datu Odin Sinsuat, Maguindanao, but the municipality field names Datu Piang, Maguindanao, 24 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":487},{"i":8363,"cid":"21M00068","pid":"P00522110MN","t":"Construction of River Bank Protection (Revetment)  at Esteros River-Upstream Phase II, Cotabato City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":null,"deo":"Cotabato City District Engineering Office","co":"ABU CONSTRUCTION","c":67549998.47,"abc":67516067.45,"fy":"2021","sd":"03/08/2022","cd":"2023-01-15","lat":7.18967,"lon":124.23625,"sm":null,"fm":null,"tm":null,"am":461,"md":null,"ls":"unknown","ww":"Esteros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":157},{"i":8364,"cid":"22FH0018","pid":"P00631440LZ","t":"Construction of Breakwater, Sta. Cruz, Virac, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIRAC (CAPITAL) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":29400000.0,"abc":29398759.99,"fy":"2022","sd":"03/02/2022","cd":"2022-11-05","lat":13.581958,"lon":124.237793,"sm":1640,"fm":1640,"tm":1640,"am":1640,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6592},{"i":8365,"cid":"22M00024","pid":"P00620248MN","t":"Construction of River Bank Protection (Revetment) at Esteros River-Upstream, Phase II, Cotabato City","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"MUST ENTERPRISES","c":28811519.78,"abc":28949922.8,"fy":"2022","sd":"12/27/2022","cd":"2023-11-06","lat":7.188223,"lon":124.23979,"sm":494,"fm":494,"tm":null,"am":461,"md":23.93,"ls":"outside","ww":"Esteros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.93,"text":"The pin is 23.9 km outside Datu Piang, Maguindanao, the nearest municipality the record claims. It falls in Cotabato City, Cotabato City.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":226},{"i":8366,"cid":"23HC0040","pid":"P00721817VS","t":"Construction of Flood Mitigation Structure, Andes Bridge River Control, Dagohoy, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DAGOHOY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":48507745.0,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-11-08","lat":9.927093,"lon":124.240745,"sm":473,"fm":473,"tm":473,"am":478,"md":1.08,"ls":"adjacent","ww":"Andes Bridge","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6593},{"i":8367,"cid":"23HC0041","pid":"P00721818VS","t":"Construction of Andes Bridge River Control, Sta. 0 + 000 - Sta. 0 + 210, Sta. 0 + 000 - Sta. 0 + 090, Danao, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DANAO (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48999860.9,"abc":49000000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-12-18","lat":9.927196,"lon":124.240783,"sm":478,"fm":478,"tm":478,"am":478,"md":0.0,"ls":"inside","ww":"Andes Bridge","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6594},{"i":8368,"cid":"22M00025","pid":"P00620249MN","t":"Construction of River Bank Protection (Revetment) at Esteros River-Upstream, Phase III, Cotabato City","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"DATU PIANG (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"MUST ENTERPRISES","c":81974860.79,"abc":82024973.4,"fy":"2022","sd":"12/27/2022","cd":"2023-12-01","lat":7.188562,"lon":124.244813,"sm":494,"fm":494,"tm":null,"am":461,"md":23.46,"ls":"outside","ww":"Esteros","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"records","s":56,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.96,"value":23.46,"text":"The pin is 23.5 km outside Datu Piang, Maguindanao, the nearest municipality the record claims. It falls in Cotabato City, Cotabato City.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":140},{"i":8369,"cid":"23KM0037","pid":"P00732486MN","t":"Construction of Drainage Ripraping, Barangay Santiago, Iligan City, Lanao del Norte","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"MILLENNIUM BUILDERS & CONSTRUCTION","c":1978999.7,"abc":1980000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-06-23","lat":8.243553,"lon":124.245207,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santiago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6595},{"i":8370,"cid":"22IH0057","pid":"P00620206VS","t":"Construction of San Antonio Shore Protection along San Antonio Circumferential Road, San Antonio, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ANTONIO (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU / VCD CONSTRUCTION AND SUPPLY","c":48473345.46,"abc":48998956.3,"fy":"2022","sd":"02/21/2022","cd":"2022-12-21","lat":12.417157,"lon":124.247679,"sm":1259,"fm":1259,"tm":1259,"am":1259,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6596},{"i":8371,"cid":"22KF0009","pid":"P00630577MN","t":"Construction of Flood Control along Iligan River (Upstream R/S), Panul-iran Bridge Section, Brgy. Abuno, Iligan City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RED CONSTRUCTION TECHNIK","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-12-09","lat":8.182299,"lon":124.249119,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.03,"wp":[8.18199,124.2491],"wst":"matched","br":"Abuno","len":null,"ph":null,"dup":[],"run":[8381,8378],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KF0009 to 22KF0012) cover the same site, together worth PHP 98,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":594},{"i":8372,"cid":"23M00177","pid":"P00721580MN","t":"Construction of River Bank Protection ( Revetment ) along Matampay river Brgy. Poblacion 5, Cotabato City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"COTABATO CITY (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":48250000.0,"abc":48250000.0,"fy":"2023","sd":"10/05/2023","cd":"2024-09-30","lat":7.22532,"lon":124.24951,"sm":null,"fm":null,"tm":null,"am":461,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 5","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":158},{"i":8373,"cid":"22M00103","pid":"P00633906MN","t":"Construction of Flood Mitigation Structure along Matampay River, Poblacion 7, Cotabato City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":"BULUAN (MAGUINDANAO)","deo":"Cotabato City District Engineering Office","co":"FFJJ CONSTRUCTION","c":144621700.5,"abc":144749922.3,"fy":"2022","sd":"08/15/2022","cd":"2023-12-22","lat":7.225308,"lon":124.250023,"sm":252,"fm":252,"tm":null,"am":461,"md":79.63,"ls":"outside","ww":"Matampay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":63,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":79.63,"text":"The pin is 79.6 km outside Buluan, Maguindanao, the nearest municipality the record claims. It falls in Cotabato City, Cotabato City.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":81},{"i":8374,"cid":"22KF0011","pid":"P00630579MN","t":"Construction of Flood Control Structure along Iligan River, Barangay Tubod, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"AL HUSSEIN CONSTRUCTION","c":37238197.29,"abc":39200000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-10-21","lat":8.220881,"lon":124.250078,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.11,"wp":[8.22048,124.2492],"wst":"matched","br":"Tubod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6597},{"i":8375,"cid":"22KF0091","pid":"P00620348MN","t":"Construction of Flood Mitigation Structures and Drainage System along Mandulog Bridge II (B00881MN), (Downstream, R/S), Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP. / H & N BUILDERS & ENTERPRISES","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-07-15","lat":8.250596,"lon":124.250758,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6598},{"i":8376,"cid":"22KF0092","pid":"P00634133MN","t":"Construction (Completion) of Drainage at Miguel Sheker Ave., Brgy. Bagong Silang, Iligan City","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"SILVER CONSTRUCTION","c":2970000.0,"abc":2970000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-07-10","lat":8.240825,"lon":124.25217,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagong Silang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6599},{"i":8377,"cid":"21K00040","pid":"P00522071MN","t":"Construction of Manggas Creek from Brgy. Hinaplanon to Iligan Bay Shoreline, Package 1, Iligan City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"Iligan City","deo":"Lanao del Norte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":69946552.43,"abc":73624675.0,"fy":"2021","sd":"03/05/2021","cd":"2023-12-27","lat":8.250124,"lon":124.253563,"sm":633,"fm":null,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Manggas","wn":"Manggas Creek","wd":0.0,"wp":[8.25012,124.25356],"wst":"matched","br":"Hinaplanon","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6600},{"i":8378,"cid":"22KF0012","pid":"P00630580MN","t":"Construction of Flood Control Structure along Iligan River, Isla Verde Section, Barangay Abuno, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"RED CONSTRUCTION TECHNIK","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-30","lat":8.183131,"lon":124.254895,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.01,"wp":[8.18321,124.25494],"wst":"matched","br":"Abuno","len":null,"ph":null,"dup":[],"run":[8371,8381],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KF0009 to 22KF0012) cover the same site, together worth PHP 98,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":627},{"i":8379,"cid":"23KM0030","pid":"P00721256MN","t":"Construction of Flood Control Structure and Drainage System along Iligan River (Pala-o Section), Iligan City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":48250000.0,"abc":48250000.0,"fy":"2023","sd":"02/22/2023","cd":"2023-08-23","lat":8.218818,"lon":124.256182,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.66,"wp":[8.21616,124.25081],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6601},{"i":8380,"cid":"22KF0013","pid":"P00630581MN","t":"Construction of Flood Control Structure along Iligan River, Tipanoy Bridge Upstream, Barangay Tipanoy, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"N.B. SALBO CONSTRUCTION","c":24272381.65,"abc":29400000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-09-28","lat":8.195028,"lon":124.256859,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.03,"wp":[8.19502,124.25714],"wst":"matched","br":"Tipanoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6602},{"i":8381,"cid":"22KF0010","pid":"P00630578MN","t":"Construction of Flood Control Structure along Iligan River, Barangay Abuno, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"IOS CONSTRUCTION SERVICES","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-09-30","lat":8.186025,"lon":124.257095,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.02,"wp":[8.18607,124.25723],"wst":"matched","br":"Abuno","len":null,"ph":null,"dup":[],"run":[8371,8378],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KF0009 to 22KF0012) cover the same site, together worth PHP 98,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":628},{"i":8382,"cid":"24KM0020","pid":"P00820403MN","t":"Construction of Flood Mitigation Structure along Iligan River (Abuno), Iligan City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"N.B. SALBO CONSTRUCTION","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-10-12","lat":8.181384,"lon":124.257423,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":0.05,"wp":[8.18182,124.25737],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6603},{"i":8383,"cid":"22KL0042","pid":"P00630487MN","t":"Construction of Flood Control Structure Lugait River (Package 1), Lugait, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LUGAIT (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-10-21","lat":8.341639,"lon":124.259156,"sm":820,"fm":820,"tm":820,"am":820,"md":0.0,"ls":"inside","ww":"Lugait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[8385,8384],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0041 to 22KL0043) cover the same site, together worth PHP 197,825,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":450},{"i":8384,"cid":"22KL0043","pid":"P00630488MN","t":"Construction of Flood Control Structure Lugait River (Package 2), Lugait, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LUGAIT (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"DL ENTERPRISES","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-25","lat":8.341569,"lon":124.262089,"sm":820,"fm":820,"tm":820,"am":820,"md":0.0,"ls":"inside","ww":"Lugait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[8385,8383],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0041 to 22KL0043) cover the same site, together worth PHP 197,825,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":451},{"i":8385,"cid":"22KL0041","pid":"P00630489MN","t":"Construction of Flood Control Structure Lugait River (Package 3), Lugait, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LUGAIT (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RAMISES CONSTRUCTION","c":62725000.0,"abc":62725000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-11","lat":8.343703,"lon":124.263022,"sm":820,"fm":820,"tm":820,"am":820,"md":0.0,"ls":"inside","ww":"Lugait","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[8383,8384],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0041 to 22KL0043) cover the same site, together worth PHP 197,825,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":452},{"i":8386,"cid":"24KG0006","pid":"P00820039MN","t":"Construction of Flood Mitigation Structure along Sagadan Bridge, Upstream (R/S), Tubod, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"TUBOD (CAPITAL) (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"CDH CONSTRUCTION / AJJ STRUKTURE BUILDERS INC.","c":87725255.0,"abc":87725255.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-21","lat":8.1438,"lon":124.2643,"sm":1595,"fm":1595,"tm":1595,"am":1517,"md":37.8,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":58,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":37.8,"text":"The pin is 37.8 km outside Tubod, Lanao del Norte, the nearest municipality the record claims. It falls in Tagoloan, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":117},{"i":8387,"cid":"22KF0090","pid":"P00620353MN","t":"Rehabilitation of Flood Control Structure along Mandulog River, Iligan City, Lanao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"LECAR BUILDERS","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-03-26","lat":8.256109,"lon":124.26745,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Mandulog","wn":"Mandulog River","wd":0.1,"wp":[8.25695,124.26715],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6604},{"i":8388,"cid":"23KL0090","pid":"P00732487MN","t":"Construction of Flood Control Structure, Barangay Poblacion, Lugait, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LUGAIT (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"LIGHT CONSTRUCTION & SUPPLY","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"06/02/2023","cd":"2023-10-04","lat":8.341178,"lon":124.268322,"sm":820,"fm":820,"tm":820,"am":820,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6605},{"i":8389,"cid":"23F00011","pid":"P00740438LZ","t":"Construction of Flood Control Structure at Binagasbasan, Barangay Paraiso, San Miguel, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"SAN MIGUEL (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":192816063.6,"abc":192816063.6,"fy":"2023","sd":"04/04/2023","cd":"2024-03-22","lat":13.756051,"lon":124.272039,"sm":1331,"fm":1331,"tm":1331,"am":1331,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paraiso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6606},{"i":8390,"cid":"21IH0043","pid":"P00521722VS","t":"Construction of Seawall (Tide Control) Shorefront Protection Riprap along Brgy. Cabacungan Shoreline, Brgy. Cabacungan, Municipality of Allen, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"Allen","deo":"Northern Samar 1st District Engineering Office","co":"C. A. CONSTRUCTION AND SUPPLY / CDU CONSTRUCTION","c":48974593.23,"abc":48999689.58,"fy":"2021","sd":"02/18/2021","cd":"2022-07-04","lat":12.566153,"lon":124.27306,"sm":43,"fm":null,"tm":43,"am":43,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabacungan Shoreline","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6607},{"i":8391,"cid":"21M00069","pid":"P00522327MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka River, Tamontaka IV, Phase I Cotabato City","w":"Construction of Revetment","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":null,"deo":"Cotabato City District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":96499997.84,"abc":96482967.52,"fy":"2021","sd":"03/08/2022","cd":"2023-01-02","lat":7.15937,"lon":124.2782,"sm":null,"fm":null,"tm":null,"am":461,"md":null,"ls":"unknown","ww":"Tamontaka","wn":"Tamontaka River","wd":0.05,"wp":[7.15892,124.27819],"wst":"matched","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":159},{"i":8392,"cid":"22FH0037","pid":"P00620732LZ","t":"Construction of Cabugao Protection Wall, Cabugao, Bato, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":24693780.0,"abc":24695020.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-22","lat":13.594142,"lon":124.280448,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6608},{"i":8393,"cid":"22IH0046","pid":"P00620207VS","t":"Construction of Shore Protection along Kinaguitman, Brgy. Kinaguitman, Allen, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"ALLEN (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"CHRISTFER CONSTRUCTION & SUPPLY","c":28767754.96,"abc":29399512.57,"fy":"2022","sd":"02/21/2022","cd":"2022-11-26","lat":12.518029,"lon":124.281634,"sm":43,"fm":43,"tm":43,"am":43,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kinaguitman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6609},{"i":8394,"cid":"22IH0005","pid":"P00620204VS","t":"Construction of Flood Control Structure along Brgy. Sabang Zone 2 and Brgy. Looc, Allen, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"ALLEN (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"C. A. CONSTRUCTION AND SUPPLY / CDU CONSTRUCTION","c":48960370.3,"abc":48999584.5,"fy":"2022","sd":"02/21/2022","cd":"2023-05-23","lat":12.503333,"lon":124.284167,"sm":43,"fm":43,"tm":43,"am":43,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang Zone 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6610},{"i":8395,"cid":"22K00224","pid":"P00632312MN","t":"Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 1, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ME 3 CONSTRUCTION","c":137480516.6,"abc":144750000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-05","lat":8.437579,"lon":124.286747,"sm":998,"fm":998,"tm":998,"am":998,"md":0.0,"ls":"inside","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6611},{"i":8396,"cid":"22FH0012","pid":"P00631436LZ","t":"Construction of Bagamanoc Breakwater, Bagamanoc, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BAGAMANOC (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":48995422.15,"abc":48998758.78,"fy":"2022","sd":"03/02/2022","cd":"2022-12-19","lat":13.951657,"lon":124.286789,"sm":106,"fm":106,"tm":106,"am":106,"md":0.11,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8397],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,789,362.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":939},{"i":8397,"cid":"22FH0020","pid":"P00631438LZ","t":"Construction of Breakwater (Phase 2), Bagamanoc, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BAGAMANOC (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NIDA BUILDER'S & SUPPLIES","c":9793940.02,"abc":9798755.02,"fy":"2022","sd":"03/02/2022","cd":"2022-10-26","lat":13.951657,"lon":124.286789,"sm":106,"fm":106,"tm":106,"am":106,"md":0.11,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[8396],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 58,789,362.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1062},{"i":8398,"cid":"22K00225","pid":"P00632313MN","t":"Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 2, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":137503763.4,"abc":144750000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-08","lat":8.438646,"lon":124.28719,"sm":998,"fm":998,"tm":998,"am":998,"md":0.01,"ls":"boundary","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6612},{"i":8399,"cid":"23K00185","pid":"P00734372MN","t":"Construction of Flood Control Structure at Manticao River (downstream of Manticao Bridge) Manticao, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MANTICAO (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / FFJJ CONSTRUCTION","c":129000000.0,"abc":198000000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-04-17","lat":8.406829,"lon":124.288256,"sm":924,"fm":924,"tm":null,"am":924,"md":0.0,"ls":"inside","ww":"Manticao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6613},{"i":8400,"cid":"23HB0106","pid":"P00721902VS","t":"Construction of Wahig River Control, Phase 2, Sierra Bollones sta. 2+000-sta. 2+700","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"SIERRA BULLONES (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / GICAR CONSTRUCTION, INC.","c":77199999.91,"abc":77200000.0,"fy":"2023","sd":"04/27/2023","cd":"2024-08-22","lat":9.805553,"lon":124.290678,"sm":1450,"fm":1450,"tm":null,"am":1450,"md":0.0,"ls":"inside","ww":"Wahig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":700.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6614},{"i":8401,"cid":"23HB0068","pid":"P00733703VS","t":"Construction of Flood Control Structure along Wahig River, Sierra Bullones, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"SIERRA BULLONES (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"CLAIRE CONSTRUCTION AND SUPPLY CORPORATION / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":98999836.9,"abc":96500000.0,"fy":"2023","sd":"04/25/2023","cd":"2024-04-15","lat":9.8051,"lon":124.29083,"sm":1450,"fm":1450,"tm":1450,"am":1450,"md":0.0,"ls":"inside","ww":"Wahig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":37,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.48,"value":1.02591,"text":"Contract cost is 2.59% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":453},{"i":8402,"cid":"22K00228","pid":"P00632316MN","t":"Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Left side), Package 5, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":137497779.3,"abc":144750000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-08","lat":8.436693,"lon":124.2914,"sm":998,"fm":998,"tm":998,"am":998,"md":0.0,"ls":"inside","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6615},{"i":8403,"cid":"22K00226","pid":"P00632314MN","t":"Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Right side), Package 3, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"NORTHERN BUILDERS","c":137507127.9,"abc":144750000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-08","lat":8.437172,"lon":124.291685,"sm":998,"fm":998,"tm":998,"am":998,"md":0.0,"ls":"inside","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6616},{"i":8404,"cid":"23HC0038","pid":"P00721815VS","t":"Construction of Flood Mitigation Structure, Malitbog River Control, Dagohoy, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DAGOHOY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":19599982.18,"abc":19600000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-09-10","lat":9.90863,"lon":124.291953,"sm":473,"fm":473,"tm":473,"am":473,"md":0.0,"ls":"inside","ww":"Malitbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6617},{"i":8405,"cid":"23KL0072","pid":"P00734389MN","t":"Construction of Flood Control Structure, Manticao River (Downstream of Manticao Bridge), Manticao, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MANTICAO (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"H & N BUILDERS & ENTERPRISES","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-07-29","lat":8.406086,"lon":124.292369,"sm":924,"fm":924,"tm":924,"am":924,"md":0.0,"ls":"inside","ww":"Manticao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6618},{"i":8406,"cid":"24KL0033","pid":"P00820267MN","t":"Construction of Flood Control Structure along Manticao River (Upstream of Manticao Br.), Manticao, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MANTICAO (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":95264800.0,"abc":95264800.0,"fy":"2024","sd":"02/05/2024","cd":"2024-11-18","lat":8.406156,"lon":124.292969,"sm":924,"fm":924,"tm":924,"am":924,"md":0.0,"ls":"inside","ww":"Manticao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6619},{"i":8407,"cid":"22K00229","pid":"P00632317MN","t":"Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Left side), Package 6, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":137501620.1,"abc":144750000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-07-17","lat":8.434934,"lon":124.294446,"sm":998,"fm":998,"tm":998,"am":998,"md":0.0,"ls":"inside","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6620},{"i":8408,"cid":"22K00227","pid":"P00632315MN","t":"Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Right side), Package 4, Naawan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"NAAWAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"NORTHERN BUILDERS","c":137507828.5,"abc":144750000.0,"fy":"2022","sd":"03/30/2022","cd":"2023-07-08","lat":8.435718,"lon":124.294919,"sm":998,"fm":998,"tm":998,"am":998,"md":0.0,"ls":"inside","ww":"Naawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6621},{"i":8409,"cid":"22HC0093","pid":"P00620035VS","t":"Construction of Flood Mitigation Structure at Malitbog River Phase 2, Dagohoy, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DAGOHOY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-07-23","lat":9.908812,"lon":124.295077,"sm":473,"fm":473,"tm":473,"am":473,"md":0.0,"ls":"inside","ww":"Malitbog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6622},{"i":8410,"cid":"23F00115","pid":"P00742479LZ","t":"Construction of Bato River Control (Phase II), Bato, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"HI-DENSITY INTERNATIONAL CONSTRUCTION AND DEVELOPMENT INC.","c":9899996.06,"abc":9899996.06,"fy":"2023","sd":"09/22/2023","cd":"2024-01-29","lat":13.609317,"lon":124.295113,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":"Bato","wn":"Bato River","wd":0.14,"wp":[13.60931,124.29636],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6623},{"i":8411,"cid":"22FH0009","pid":"P00631452LZ","t":"Construction of River Control Structure, Barangay San Nicolas, Panganiban, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"PANGANIBAN (PAYO) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"MS2 BUILDER AND SUPPLIES INC.","c":29398959.54,"abc":29400000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-03","lat":13.908263,"lon":124.295686,"sm":1085,"fm":1085,"tm":1085,"am":1085,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Nicolas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6624},{"i":8412,"cid":"22FH0041","pid":"P00631451LZ","t":"Construction of River Control Structure, Barangay Salvacion, Panganiban, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"PANGANIBAN (PAYO) (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"EMSYM CONSTRUCTION CORP.","c":29398959.94,"abc":29399999.73,"fy":"2022","sd":"03/22/2022","cd":"2022-10-31","lat":13.905618,"lon":124.295939,"sm":1085,"fm":1085,"tm":1085,"am":1085,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6625},{"i":8413,"cid":"22FH0033","pid":"P00631437LZ","t":"Construction of Bato River Control, Bato, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":48998760.0,"abc":49000000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-19","lat":13.607323,"lon":124.298036,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":"Bato","wn":"Bato River","wd":0.18,"wp":[13.60733,124.29635],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6626},{"i":8414,"cid":"24HB0112","pid":"P00834980VS","t":"Construction of Manaba River Control, Garcia-Hernandez (Tabuan Section), Bohol, Sta. 0+000.00 - Sta. 0+450.00","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GARCIA HERNANDEZ (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":98944930.25,"abc":99000000.0,"fy":"2024","sd":"04/12/2024","cd":"2025-03-05","lat":9.66293,"lon":124.299432,"sm":567,"fm":567,"tm":567,"am":567,"md":0.0,"ls":"inside","ww":"Manaba","wn":"Manaba River","wd":0.01,"wp":[9.66301,124.29945],"wst":"matched","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6627},{"i":8415,"cid":"23HB0042","pid":"P00721782VS","t":"Rehabilitation of Manaba River Control (Upstream), Manaba, Garcia-Hernandez, Bohol","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"GARCIA HERNANDEZ (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"FUENTABUILT CONSTRUCTION CORP. / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":86849987.16,"abc":86850000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-12-18","lat":9.615848,"lon":124.300216,"sm":567,"fm":567,"tm":567,"am":567,"md":0.0,"ls":"inside","ww":"Manaba","wn":"Manaba River","wd":0.03,"wp":[9.61571,124.30046],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6628},{"i":8416,"cid":"22IH0047","pid":"P00620203VS","t":"Construction of Flood Control Structure along Brgy. Colab-og (Colab-og Bridge), Victoria, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"VICTORIA (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"RNMK  CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP. (FOR: RNMK CONST. & DEV'T) / CDU CONSTRUCTION","c":48044665.17,"abc":48999518.03,"fy":"2022","sd":"02/21/2022","cd":"2022-10-10","lat":12.457714,"lon":124.300385,"sm":1628,"fm":1628,"tm":1628,"am":1628,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Colab-og","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6629},{"i":8417,"cid":"23HB0041","pid":"P00721783VS","t":"Rehabilitation of Manaba River Control (Downstream), Manaba, Garcia-Hernandez, Bohol","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"GARCIA HERNANDEZ (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":86848873.54,"abc":86850000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-12-18","lat":9.615818,"lon":124.300532,"sm":567,"fm":567,"tm":567,"am":567,"md":0.0,"ls":"inside","ww":"Manaba","wn":"Manaba River","wd":0.0,"wp":[9.61582,124.30052],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6630},{"i":8418,"cid":"23FH0009","pid":"P00737569LZ","t":"Construction of Flood Control at Sibacungan, Bato, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NVR CONSTRUCTION","c":4807350.58,"abc":4949997.56,"fy":"2023","sd":"02/17/2023","cd":"2023-05-14","lat":13.63205,"lon":124.3007,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6631},{"i":8419,"cid":"23HB0160","pid":"P00745641VS","t":"Rehabilitation/Reconstruction of Manaba River Control (Phase 2), Garcia Hernandez, Bohol, Sta. 0+651.88 - Sta 0+840.00 R/S, Sta. 0+424.00 - Sta.0+866.92 L/S","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"GARCIA HERNANDEZ (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"KMCM BUILDERS AND DEVELOPMENT CORPORATION / GICAR CONSTRUCTION, INC.","c":96300240.26,"abc":96300245.0,"fy":"2023","sd":"08/10/2023","cd":"2024-02-20","lat":9.61816,"lon":124.30091,"sm":567,"fm":567,"tm":null,"am":567,"md":0.0,"ls":"inside","ww":"Manaba","wn":"Manaba River","wd":0.03,"wp":[9.61814,124.30114],"wst":"matched","br":null,"len":631.0,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6632},{"i":8420,"cid":"24HI0143","pid":"P00835010VS","t":"Construction of Flood Control, Brgy. Santiago San Francisco, Cebu","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"CEBU","mu":"SAN FRANCISCO (CEBU)","deo":"Cebu 5th District Engineering Office","co":"BARR STEEL CONSTRUCTION","c":4945000.0,"abc":4950000.0,"fy":"2024","sd":"08/12/2024","cd":"2024-11-09","lat":10.590003,"lon":124.305001,"sm":1277,"fm":1277,"tm":362,"am":1277,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santiago San Francisco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":43.55,"text":"The record contradicts itself: the municipality field and the pin point to San Francisco, Cebu, but the title names Cebu City, Cebu, 44 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":631},{"i":8421,"cid":"24HB0140","pid":"P00834599VS","t":"Construction of Seawall Protection, Garcia-Hernandez, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"GARCIA HERNANDEZ (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MOG CONSTRUCTION INC. / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION)","c":57877936.0,"abc":57900000.0,"fy":"2024","sd":"05/28/2024","cd":"2025-03-06","lat":9.617094,"lon":124.308454,"sm":567,"fm":567,"tm":567,"am":567,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6633},{"i":8422,"cid":"21M00070","pid":"P00522326MN","t":"Construction of River Bank Protection (Revetment) along Tamontaka River, Tamontaka V, Phase III Cotabato City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"MAGUINDANAO DEL NORTE","mu":null,"deo":"Cotabato City District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":96499999.09,"abc":96490689.91,"fy":"2021","sd":"03/08/2022","cd":"2023-01-02","lat":7.14028,"lon":124.30924,"sm":null,"fm":null,"tm":null,"am":461,"md":null,"ls":"unknown","ww":"Tamontaka","wn":"Tamontaka River","wd":0.01,"wp":[7.14023,124.30917],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":160},{"i":8423,"cid":"22FH0014","pid":"P00620731LZ","t":"Construction of Batalay Seawall (Sta. Elena), Bato, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":44092985.45,"abc":44100000.0,"fy":"2022","sd":"03/02/2022","cd":"2023-09-05","lat":13.58906,"lon":124.311416,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6634},{"i":8424,"cid":"24KM0043","pid":"P00820909MN","t":"Construction of Flood Control Structure along Iligan River, Merila, Barangay Ubaldo Laya, Iligan City, Lanao Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"THE HUANG BUILDERS INC.","c":9650000.0,"abc":9800000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-09-04","lat":8.24019,"lon":124.314871,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Iligan","wn":"Iligan River","wd":7.53,"wp":[8.20572,124.2559],"wst":"matched","br":"Ubaldo Laya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.64,"value":7.53,"text":"The title names Iligan, which OpenStreetMap maps through the stated municipality, but the pin is 7.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":396},{"i":8425,"cid":"24KM0063","pid":"P00820282MN","t":"Construction of Flood Mitigation Structure along Mandulog River at Digkilaan Bridge, Iligan City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":77198185.6,"abc":77200000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-09-20","lat":8.25299,"lon":124.316586,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Mandulog","wn":"Mandulog River","wd":0.05,"wp":[8.25256,124.31655],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6635},{"i":8426,"cid":"23FH0010","pid":"P00737572LZ","t":"Construction of River Control Dike at Bagumbayan, Bato, Catanduanes","w":"Construction of Dike","rg":"Region V","pv":"CATANDUANES","mu":"BATO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"TNB BUILDERS","c":4948753.5,"abc":4950000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-06-13","lat":13.61632,"lon":124.3195,"sm":183,"fm":183,"tm":183,"am":183,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6636},{"i":8427,"cid":"22KF0018","pid":"P00630582MN","t":"Construction of Flood Control Structure along Mandulog River, near Red Cross Village Phase II at Barangay Digkilaan, Iligan City, Lanao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Lanao del Norte 1st District Engineering Office","co":"GRACE CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-10-22","lat":8.243825,"lon":124.321821,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":"Mandulog","wn":"Mandulog River","wd":1.09,"wp":[8.2526,124.31727],"wst":"matched","br":"Digkilaan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6637},{"i":8428,"cid":"24KM0010","pid":"P00820152MN","t":"Construction of Mandulog CIS Protection Dike, Iligan City, Lanao Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL NORTE","mu":"ILIGAN CITY (LANAO DEL NORTE)","deo":"Iligan City District Engineering Office","co":"ALFAHAD BUILDERS AND ENTERPRISES","c":12250000.0,"abc":12250000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-05-31","lat":8.231678,"lon":124.323102,"sm":633,"fm":633,"tm":633,"am":633,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6638},{"i":8429,"cid":"24HB0004","pid":"P00821149VS","t":"Construction of Wahig River Control Structure, Pamacsalan Area, Pilar, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"PILAR (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":130419495.0,"abc":130509495.0,"fy":"2024","sd":"03/05/2024","cd":"2024-08-15","lat":9.808394,"lon":124.326447,"sm":1133,"fm":1133,"tm":1133,"am":1133,"md":0.0,"ls":"inside","ww":"Wahig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6639},{"i":8430,"cid":"23IH0093","pid":"P00733758VS","t":"Construction of Sea Wall from Brgy. Sabang-Tabok to Brgy. Cataogan, Lavezares, Northern Samar (Package A)","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAVEZARES (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"CALIFORNIAROCK CONSTRUCTION","c":9895774.56,"abc":9899577.08,"fy":"2023","sd":"06/20/2023","cd":"2023-10-15","lat":12.535769,"lon":124.33084,"sm":763,"fm":763,"tm":763,"am":763,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang-Tabok","len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6640},{"i":8431,"cid":"22K00336","pid":"P00631073MN","t":"Construction of Open Canal, Barangay Pugaan, Marawi City, Lanao del Sur","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"MARAWI CITY (CAPITAL) (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"TJB CONSTRUCTION","c":9602355.78,"abc":9900000.0,"fy":"2022","sd":"07/15/2022","cd":"2022-12-12","lat":8.003106,"lon":124.334711,"sm":934,"fm":934,"tm":934,"am":934,"md":0.0,"ls":"inside","ww":"Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Pugaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6641},{"i":8432,"cid":"22K00169","pid":"P00631074MN","t":"Construction of Open Canal, Upper Pugaan, Ditsaan-Ramain, Lanao del Sur","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"DITSAAN-RAMAIN (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"TJB CONSTRUCTION","c":6720593.89,"abc":6930000.0,"fy":"2022","sd":"07/25/2022","cd":"2022-12-12","lat":8.005649,"lon":124.337642,"sm":521,"fm":521,"tm":521,"am":521,"md":0.0,"ls":"inside","ww":"Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6642},{"i":8433,"cid":"23HC0003","pid":"P00721813VS","t":"Construction of Flood Mitigation Structure, Cambangay River Control (LIR-Cambangay Br.), San Miguel, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"SAN MIGUEL (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48999999.81,"abc":49000000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-12-27","lat":9.981192,"lon":124.338178,"sm":1333,"fm":1333,"tm":1333,"am":1333,"md":0.0,"ls":"inside","ww":"Cambangay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6643},{"i":8434,"cid":"23K00166","pid":"P00721665MN","t":"Construction of Mala-Lawasaig River Flood Control with Street Pile and Slope Protection, Barangay Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"DITSAAN-RAMAIN (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.","c":114640737.1,"abc":115800000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-03-23","lat":7.985,"lon":124.3435,"sm":521,"fm":521,"tm":521,"am":521,"md":0.0,"ls":"inside","ww":"Mala-Lawasaig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lilod Baclayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6644},{"i":8435,"cid":"21IL0139","pid":"P00549879VS","t":"Construction of Road Slope Protection along Maasin Bypass Road, Maasin City, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"City of Maasin","deo":"Southern Leyte 1st District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"11/22/2021","cd":"2022-12-06","lat":10.131667,"lon":124.846389,"sm":397,"fm":null,"tm":397,"am":397,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6645},{"i":8436,"cid":"24KA0109","pid":"P00820030MN","t":"Construction of Flood Mitigation Structure along Impasug-ong Bridge (Right Side), Impasug-ong, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"IMPASUG-ONG (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-03-21","lat":8.305936,"lon":125.011853,"sm":637,"fm":637,"tm":637,"am":637,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6646},{"i":8437,"cid":"23IM0037","pid":"P00721598VS","t":"Construction of Revetment along Kawayan River (upstream), Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"SAMARINAN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: SAMARINAN CONSTRUCTION)","c":55361832.97,"abc":55481515.98,"fy":"2023","sd":"03/23/2023","cd":"2024-01-05","lat":11.338892,"lon":124.946459,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Kawayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6647},{"i":8438,"cid":"23HC0039","pid":"P00721667VS","t":"Construction of Seawall, Cuya, Ubay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"UBAY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":48999999.44,"abc":49000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-03-02","lat":9.975489,"lon":124.568613,"sm":1612,"fm":1612,"tm":1612,"am":1612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6648},{"i":8439,"cid":"23IF0074","pid":"P00733319VS","t":"Construction of Seawall, Sitio Lawis, Brgy. Tabgas, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AICON INDUSTRIES","c":28900007.47,"abc":29400000.0,"fy":"2023","sd":"04/26/2023","cd":"2023-07-20","lat":10.901288,"lon":124.702763,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabgas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6649},{"i":8440,"cid":"23IA0043","pid":"P00732038VS","t":"Construction of Seawall, Barangay Bato, Maripipi, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"MARIPIPI (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":4802990.4,"abc":4945926.72,"fy":"2023","sd":"03/01/2023","cd":"2023-04-20","lat":11.807997,"lon":124.347932,"sm":942,"fm":942,"tm":942,"am":942,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6650},{"i":8441,"cid":"23IC0037","pid":"P00721710VS","t":"Construction of Flood Control Structure along Busay River (Downstream), Brgy. District III, Babatngon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC. / GO_SOLID BUILDERS INC.","c":48899539.72,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-12","lat":11.410873,"lon":124.847453,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":"Busay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"District III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6651},{"i":8442,"cid":"24MF0018","pid":"P00820419MN","t":"Construction of Flood Control Structure, Ala River (D'Lotilla - Bual), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY)","c":44954629.65,"abc":45010131.39,"fy":"2024","sd":"02/15/2024","cd":"2024-06-10","lat":6.6463,"lon":124.572083,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8858,8447,8583,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":595},{"i":8443,"cid":"23KE0008","pid":"P00721375MN","t":"Construction of River Control along Baylao Bridge, Barangay Baylao, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":48771663.88,"abc":49292188.72,"fy":"2023","sd":"02/27/2023","cd":"2023-10-29","lat":9.245215,"lon":124.703333,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baylao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6652},{"i":8444,"cid":"22KB0032","pid":"P00630572MN","t":"Construction of Revetment, Downstream and Upstream of Camp I Bridge along Maramag River, Barangay Camp I, Maramag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/07/2022","cd":"2023-02-01","lat":7.718672,"lon":125.013302,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Maramag","wn":"Maramag River","wd":0.02,"wp":[7.71878,125.01342],"wst":"matched","br":"Camp I","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6653},{"i":8445,"cid":"23IA0034","pid":"P00732039VS","t":"Construction of Seawall, Barangay Ermita, Maripipi, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"MARIPIPI (BILIRAN)","deo":"Biliran District Engineering Office","co":"M.B. ANG CONSTRUCTION & SUPPLY","c":4946975.56,"abc":4945855.94,"fy":"2023","sd":"02/27/2023","cd":"2023-08-15","lat":11.776855,"lon":124.348914,"sm":942,"fm":942,"tm":942,"am":942,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ermita","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6654},{"i":8446,"cid":"22IL0071","pid":"P00620062VS","t":"Construction of Guinsangaan Flood Control, Bontoc, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"BONTOC (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48743543.85,"abc":48777855.0,"fy":"2022","sd":"02/22/2022","cd":"2023-07-19","lat":10.355247,"lon":124.9471,"sm":226,"fm":226,"tm":226,"am":226,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6655},{"i":8447,"cid":"24MF0019","pid":"P00820420MN","t":"Construction of Flood Control Structure, Ala River (Impao - Allah Bridge), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY)","c":44953154.08,"abc":45008654.58,"fy":"2024","sd":"02/15/2024","cd":"2024-06-28","lat":6.655208,"lon":124.5724,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8858,8442,8583,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":596},{"i":8448,"cid":"24II0036","pid":"P00820250VS","t":"Rehabilitation of Bantayan Flood Control Structure, Bantayan River Basin, San Roque, Northern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JCL CONSTRUCTION AND SUPPLY","c":48982964.54,"abc":48999978.1,"fy":"2024","sd":"06/07/2024","cd":"2025-03-03","lat":12.527972,"lon":124.848558,"sm":1357,"fm":1357,"tm":1357,"am":1357,"md":0.0,"ls":"inside","ww":"Bantayan","wn":"Bantayan River","wd":0.04,"wp":[12.52773,124.8488],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6656},{"i":8449,"cid":"22KE0032","pid":"P00630576MN","t":"Construction of Seawall, Purok 4, Barangay Bonbon, Catarman, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"CATARMAN (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"R AND L BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":4702476.58,"abc":4949999.73,"fy":"2022","sd":"03/17/2022","cd":"2022-08-16","lat":9.14724,"lon":124.704597,"sm":353,"fm":353,"tm":353,"am":353,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonbon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6657},{"i":8450,"cid":"22IC0070","pid":"P00620415VS","t":"Construction of Flood Control along Limbuhan River (Sta. 3+487 - Sta. 4+160), Brgy. Cantariwis, Tolosa, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TOLOSA (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"XDR CONSTRUCTION AND SUPPLY","c":24435006.02,"abc":24500000.0,"fy":"2022","sd":"05/16/2022","cd":"2022-10-06","lat":11.049832,"lon":125.013305,"sm":1578,"fm":1578,"tm":1578,"am":1578,"md":0.0,"ls":"inside","ww":"Limbuhan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantariwis","len":673.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6658},{"i":8451,"cid":"22F00122","pid":"P00631445LZ","t":"Construction of Flood Control, Tilod, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: E.R. RODRIGUEZ CONSTRUCTION)","c":19300000.0,"abc":19299817.24,"fy":"2022","sd":"04/08/2022","cd":"2022-11-07","lat":13.649954,"lon":124.349231,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6659},{"i":8452,"cid":"24IC0060","pid":"P00820228VS","t":"Construction of Lower Binahaan RIS Flood Control Dike of 3 Solar Pump Units, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"ROCKWORLD INDUSTRIES","c":19403992.94,"abc":19600000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-05-20","lat":11.08242,"lon":124.94717,"sm":1540,"fm":1540,"tm":1540,"am":472,"md":0.13,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6660},{"i":8453,"cid":"23MG0023","pid":"P00721391MN","t":"Construction of Drainage Structure Jct. National Highway along Arellano Street, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION / MANUELA CONSTRUCTION SERVICES","c":24499823.52,"abc":39200000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-18","lat":6.49556,"lon":124.84884,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6661},{"i":8454,"cid":"22MF0011","pid":"P00620285MN","t":"Construction of Flood Control Structure, Ala River (Impao Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":48999100.07,"abc":48991147.6,"fy":"2022","sd":"02/22/2022","cd":"2022-12-19","lat":6.651636,"lon":124.572889,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8524,8577,8639,8706,8908,8760],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":531},{"i":8455,"cid":"24KK0025","pid":"P00820256MN","t":"Construction of Flood Control Structure along Dangoan River, Package 3, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":120623720.0,"abc":120625000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-09-24","lat":8.916838,"lon":125.01397,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":"Dangoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6662},{"i":8456,"cid":"23IM0051","pid":"P00733326VS","t":"Construction of Revetment along Suhi River, Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JGO BUILDERS","c":48606003.37,"abc":48999257.25,"fy":"2023","sd":"03/23/2023","cd":"2023-10-30","lat":11.32001,"lon":124.947307,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Suhi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6663},{"i":8457,"cid":"22IA0040","pid":"P00630667VS","t":"Construction of Seawall, Barangay Binongto-an, Maripipi, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"MARIPIPI (BILIRAN)","deo":"Biliran District Engineering Office","co":"M.B. ANG CONSTRUCTION & SUPPLY","c":4732669.5,"abc":4945318.21,"fy":"2022","sd":"02/21/2022","cd":"2022-12-16","lat":11.7774,"lon":124.3493,"sm":942,"fm":942,"tm":942,"am":942,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Binongto-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6664},{"i":8458,"cid":"24MG0068","pid":"P00836194MN","t":"Construction of Line Canal, Barangay Derilon, Banga, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"BANGA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"MR-B CONSTRUCTION SERVICES","c":4949990.19,"abc":4950000.0,"fy":"2024","sd":"05/10/2024","cd":"2024-08-22","lat":6.32428,"lon":124.85039,"sm":148,"fm":148,"tm":148,"am":148,"md":0.0,"ls":"inside","ww":"Line","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Derilon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6665},{"i":8459,"cid":"24MF0045","pid":"P00820921MN","t":"Construction of Flood Control Structure along Ala River ( Impao- Dansuli Section), Isulan, Sultan Kudarat.","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"KANAWAY BUILDERS CORPORATION","c":47943654.07,"abc":48248454.28,"fy":"2024","sd":"05/08/2024","cd":"2024-11-22","lat":6.651579,"lon":124.572904,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6666},{"i":8460,"cid":"24K00178","pid":"P00820262MN","t":"Construction of Flood Control Structure along Iponan River, Package 9, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":146125204.5,"abc":149575000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-01-30","lat":8.447269,"lon":124.575952,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.02,"wp":[8.44743,124.5758],"wst":"matched","br":null,"len":null,"ph":"Package 9","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6667},{"i":8461,"cid":"21IM0052","pid":"P00549893VS","t":"Construction of Flood Mitigation Structure and Riverbank Protection, Greendale 1 and 3, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tacloban City","deo":"Tacloban City District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":33609332.12,"abc":34648502.55,"fy":"2021","sd":"04/23/2021","cd":"2022-07-01","lat":11.317633,"lon":124.948006,"sm":1507,"fm":null,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6668},{"i":8462,"cid":"23KD0019","pid":"P00734387MN","t":"Construction of Cugman River Dike (Tablon Side/Down Stream), Brgy. Tablon, Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"ALEBON GENUINE MERCHANDISING INCORPORATED","c":33611633.73,"abc":34650000.0,"fy":"2023","sd":"04/01/2023","cd":"2023-11-10","lat":8.472822,"lon":124.7055,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.01,"wp":[8.47288,124.70543],"wst":"matched","br":"Tablon","len":null,"ph":null,"dup":[8468],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 43,215,552.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":977},{"i":8463,"cid":"24KL0078","pid":"P00835877MN","t":"Construction of Seawall, Libertad, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"LIBERTAD (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RBT VENTURES","c":9800000.0,"abc":9800000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-10-06","lat":8.561,"lon":124.3497,"sm":779,"fm":779,"tm":779,"am":779,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6669},{"i":8464,"cid":"22MG0021","pid":"P00620187MN","t":"Construction of Diversion Channel Project (Channel 3), Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":29397132.27,"abc":58800000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-09-03","lat":6.501667,"lon":124.850833,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6670},{"i":8465,"cid":"23FH0023","pid":"P00727222LZ","t":"Construction of Flood Mitigation Structures, Barangay Tilod, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":48998497.98,"abc":49000000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-09-08","lat":13.651688,"lon":124.350123,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tilod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6671},{"i":8466,"cid":"24IF0051","pid":"P00820239VS","t":"Construction of Box Culvert, Barangay Montebello, Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CIRCLE Z VENTURES & DEVELOPMENT CORP.","c":4850996.77,"abc":4900000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-05-19","lat":11.136831,"lon":124.577902,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Montebello","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6672},{"i":8467,"cid":"22I00019","pid":"P00620053VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 5, Brgy. Calogcog, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":30407316.0,"abc":30879711.2,"fy":"2022","sd":"03/07/2022","cd":"2022-09-16","lat":11.129275,"lon":125.0141,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calogcog","len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6673},{"i":8468,"cid":"23KD0020","pid":"P00734020MN","t":"Construction of Cugman River Dike (Tablon Side, Downstream) at Cugman River, Tablon, Cagayan de Oro City , Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"ALL WEATHER CONSTRUCTION","c":9603918.56,"abc":9900000.0,"fy":"2023","sd":"04/14/2023","cd":"2023-11-20","lat":8.472822,"lon":124.7055,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.01,"wp":[8.47288,124.70543],"wst":"matched","br":null,"len":null,"ph":null,"dup":[8462],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 43,215,552.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1063},{"i":8469,"cid":"24IC0032","pid":"P00832677VS","t":"Construction of Flood Control Structure (Drainage Canal), Zone 2, Barangay Capangihan, Tolosa, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TOLOSA (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"G.O.C. BUILDERS","c":9881420.87,"abc":9900000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-08-16","lat":11.19635,"lon":124.948908,"sm":1578,"fm":1578,"tm":1578,"am":1384,"md":16.48,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Capangihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.91,"value":16.48,"text":"The pin is 16.5 km outside Tolosa, Leyte, the nearest municipality the record claims. It falls in Santa Fe, Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":293},{"i":8470,"cid":"23IL0040","pid":"P00721972VS","t":"Construction of Canturing Flood Structures, Canturing River, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"02/24/2023","cd":"2023-12-03","lat":10.136697,"lon":124.853536,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":"Canturing","wn":"Le Canturing River","wd":0.01,"wp":[10.1367,124.85364],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6674},{"i":8471,"cid":"22K00295","pid":"P00634130MN","t":"Construction of Open Canal Brgy Rantian Ditsaan-Ramain Lanao Del Sur","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"DITSAAN-RAMAIN (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"TJB CONSTRUCTION","c":9602479.28,"abc":9900000.0,"fy":"2022","sd":"08/08/2022","cd":"2023-01-09","lat":7.970865,"lon":124.352569,"sm":521,"fm":521,"tm":null,"am":521,"md":0.0,"ls":"inside","ww":"Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rantian Ditsaan-Ramain Lanao Del Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6675},{"i":8472,"cid":"23KH0034","pid":"P00721640MN","t":"Construction of Flood Control Structure along Iponan River, Barangay Pagatpat, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":71255247.92,"abc":72375000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-11-28","lat":8.460556,"lon":124.578611,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.04,"wp":[8.46018,124.57854],"wst":"matched","br":"Pagatpat","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6676},{"i":8473,"cid":"22IC0069","pid":"P00620414VS","t":"Construction of Flood Control along Limbuhan River (Sta. 4+460 - Sta. 4+773), Brgy. Cantariwis, Tolosa, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TOLOSA (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"XDR CONSTRUCTION AND SUPPLY","c":24435002.77,"abc":24500000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-10-06","lat":11.055894,"lon":125.015182,"sm":1578,"fm":1578,"tm":1578,"am":1578,"md":0.0,"ls":"inside","ww":"Limbuhan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cantariwis","len":313.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6677},{"i":8474,"cid":"23IM0043","pid":"P00721914VS","t":"Construction of Revetment along Suhi River, Phase 2, Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":55285766.28,"abc":55485794.03,"fy":"2023","sd":"03/23/2023","cd":"2024-03-24","lat":11.319892,"lon":124.949298,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Suhi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6678},{"i":8475,"cid":"24KD0025","pid":"P00821079MN","t":"Construction of Flood Control Structure along Cugman River, barangay Cugman Section, Cagayan de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"ERS CONSTRUCTION / VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":47530417.08,"abc":49000000.0,"fy":"2024","sd":"02/29/2024","cd":"2024-10-24","lat":8.47134,"lon":124.705935,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.01,"wp":[8.47138,124.70603],"wst":"matched","br":"Cugman Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6679},{"i":8476,"cid":"22IJ0082","pid":"P00620060VS","t":"Construction of Flood Control Structure along Pulid River, Calbayog City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":93928535.96,"abc":94570000.0,"fy":"2022","sd":"03/04/2022","cd":"2024-04-22","lat":12.184341,"lon":124.578777,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Pulid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6680},{"i":8477,"cid":"22MI0009","pid":"P00620279MN","t":"Construction of Revetment, Kabacan River Flood Control (Sta. 29+286 - Sta. 29+671 right bank, Matalam, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MATALAM (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":46723426.11,"abc":48250000.0,"fy":"2022","sd":"03/15/2022","cd":"2023-01-27","lat":7.142058,"lon":124.949444,"sm":951,"fm":951,"tm":951,"am":951,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.14245,124.94934],"wst":"matched","br":null,"len":385.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6681},{"i":8478,"cid":"23HC0046","pid":"P00721814VS","t":"Construction of Flood Mitigation Structure, Cambangay - Hagbuyo River Control, San Miguel, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"SAN MIGUEL (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"RL EARTH HAULING & EQUIPMENT SERVICES INC.","c":19599984.54,"abc":19600000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-09-18","lat":10.006099,"lon":124.35319,"sm":1333,"fm":1333,"tm":1333,"am":1333,"md":0.0,"ls":"inside","ww":"Hagbuyo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6682},{"i":8479,"cid":"22IC0020","pid":"P00620327VS","t":"Construction of Flood Control along Solano River, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"888 ACY ENTERPRISES / JGO BUILDERS","c":44099637.41,"abc":44100000.0,"fy":"2022","sd":"03/13/2022","cd":"2022-11-21","lat":11.50856,"lon":125.015254,"sm":1540,"fm":1540,"tm":1540,"am":1139,"md":41.34,"ls":"outside","ww":"Solano","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":50,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":41.34,"text":"The pin is 41.3 km outside Tanauan, Leyte, the nearest municipality the record claims. It falls in Pinabacdao, Samar.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":192},{"i":8480,"cid":"23K00132","pid":"P00721269MN","t":"Construction of Somogot Flood Control, Barangay Somogot, Amai Manabilang, Lanao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"AMAI MANABILANG (LANAO DEL SUR)","deo":"Lanao del Sur 1st District Engineering Office","co":"M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.","c":47767418.63,"abc":48250000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-11-30","lat":7.755235,"lon":124.706174,"sm":null,"fm":null,"tm":null,"am":254,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Somogot","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":161},{"i":8481,"cid":"22I00014","pid":"P00620054VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 6, Brgy. Calogcog, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP. / RT BUILDERS","c":17369031.34,"abc":17369381.06,"fy":"2022","sd":"03/07/2022","cd":"2022-08-18","lat":11.127401,"lon":125.015633,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calogcog","len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6683},{"i":8482,"cid":"22IC0022","pid":"P00620329VS","t":"Construction/Maintenance of Flood Mitigation Structure and Drainage Systems, Construction of Flood Control Along Binahaan River, Sta. 27+320 - Sta. 27+663, Brgy. Guingauan, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48020000.0,"abc":48020000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-25","lat":11.0765,"lon":124.953159,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.2,"wp":[11.07834,124.95328],"wst":"matched","br":"Guingauan","len":343.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6684},{"i":8483,"cid":"22IJ0006","pid":"P00620211VS","t":"Construction of Flood Control Structure at Pulid Bridge K0794 + 818 - K0794 + 825, Brgy. Quezon, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"RNMK  CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP. (FOR: RNMK CONST. & DEV'T)","c":48610274.66,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2024-04-22","lat":12.186944,"lon":124.579167,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6685},{"i":8484,"cid":"22IL0080","pid":"P00632046VS","t":"Construction of Canturing Flood Control (Canturing-Nasaug Section), Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":24715027.7,"abc":24750000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-01-25","lat":10.136997,"lon":124.853611,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6686},{"i":8485,"cid":"22IA0114","pid":"P00633234VS","t":"Construction of Seawall at Brgy. Talahid, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":4945511.65,"abc":4943652.05,"fy":"2022","sd":"03/29/2022","cd":"2022-08-10","lat":11.636559,"lon":124.365929,"sm":45,"fm":45,"tm":45,"am":45,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talahid","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6687},{"i":8486,"cid":"20I00042","pid":"P00420371VS","t":"Construction of Storm Surge Protection: Heightened Road Tide Embankment, (Construction of Calogcog River Backwater Dike, Left Bank), Tanuan, Leyte","w":"Construction of Dike","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94979372.12,"abc":192799217.9,"fy":"2020","sd":"12/03/2020","cd":"2022-10-25","lat":11.120856,"lon":125.015853,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Calogcog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6688},{"i":8487,"cid":"22IA0050","pid":"P00630663VS","t":"Construction of Drainage, Barangay Palanay, Caibiran, Biliran","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"MKB BUILDERS AND SUPPLY","c":4945075.35,"abc":4944999.11,"fy":"2022","sd":"03/16/2022","cd":"2022-07-28","lat":11.569759,"lon":124.581036,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palanay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6689},{"i":8488,"cid":"23KD0021","pid":"P00721611MN","t":"Construction of Flood Control Structure (Tablon Side) along Cugman River, Cugman, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION)","c":47518988.99,"abc":49000000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-10-25","lat":8.469817,"lon":124.7067,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.01,"wp":[8.46979,124.7066],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6690},{"i":8489,"cid":"24IH0057","pid":"P00835028VS","t":"Construction of Seawall, Brgy. Barobaybay, Lavezares, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAVEZARES (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"CALIFORNIAROCK CONSTRUCTION","c":4934326.2,"abc":4949329.89,"fy":"2024","sd":"04/25/2024","cd":"2024-07-15","lat":12.5531,"lon":124.36606,"sm":763,"fm":763,"tm":763,"am":763,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Barobaybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6691},{"i":8490,"cid":"22KL0050","pid":"P00630485MN","t":"Construction of Flood Control Structure Igpit River (Package 2), Opol, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"OPOL (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"LYD CONSTRUCTION / RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY)","c":56703295.7,"abc":62725000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-10-25","lat":8.508042,"lon":124.581678,"sm":1039,"fm":1039,"tm":1039,"am":1039,"md":0.0,"ls":"inside","ww":"Igpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[8506,8517],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0049 to 22KL0051) cover the same site, together worth PHP 172,970,270.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":454},{"i":8491,"cid":"20I00042","pid":"P00420371VS","t":"Construction of Storm Surge Protection: Heightened Road Tide Embankment, (Construction of Calogcog River Backwater Dike, Left Bank), Tanuan, Leyte","w":"Construction of Dike","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94979372.12,"abc":192799217.9,"fy":"2021","sd":"12/03/2020","cd":"2022-10-25","lat":11.120856,"lon":125.015853,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Calogcog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6692},{"i":8492,"cid":"23IL0055","pid":"P00733292VS","t":"Construction of Bato 1 - Bato 2 Flood Control, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION) / UKC BUILDERS, INC.","c":67549985.32,"abc":67550000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-26","lat":10.13856,"lon":124.85371,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6693},{"i":8493,"cid":"22IL0087","pid":"P00620225VS","t":"Construction of Canturing Flood Control, Canturing, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":48938901.35,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-06-04","lat":10.135392,"lon":124.853719,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6694},{"i":8494,"cid":"23IL0006","pid":"P00732050VS","t":"Construction of Flood Control Structure, Barangay Bogo Gotosan, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"DAV-LEY CONSTRUCTION SERVICES INC. (FORMERLY:DAV-LEY CONSTRUCTION SERVICES)","c":9899981.77,"abc":9800000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-06-16","lat":10.147848,"lon":124.854078,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bogo Gotosan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":23,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":978},{"i":8495,"cid":"24IM0051","pid":"P00834622VS","t":"Construction of Flood Control Structure, barangay Palanog Water, Phase 2, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JGO BUILDERS / R. YAO CONSTRUCTION","c":96419743.33,"abc":96497346.95,"fy":"2024","sd":"05/17/2024","cd":"2024-10-17","lat":11.317459,"lon":124.953561,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Palanog Water","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6695},{"i":8496,"cid":"24KD0024","pid":"P00821080MN","t":"Construction of Flood Control Structure along Cugman River, barangay Tablon Section, Cagayan de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":48699961.11,"abc":49000000.0,"fy":"2024","sd":"04/01/2024","cd":"2024-10-23","lat":8.467874,"lon":124.707324,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.02,"wp":[8.46782,124.70715],"wst":"matched","br":"Tablon Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6696},{"i":8497,"cid":"23II0018","pid":"P00721615VS","t":"Construction of River Control at Barangay Matelarag, Las Navas, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAS NAVAS (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JUPA CONSTRUCTION / CHRISTFER CONSTRUCTION & SUPPLY","c":65894529.87,"abc":66584930.31,"fy":"2023","sd":"02/07/2023","cd":"2024-07-02","lat":12.322728,"lon":125.015942,"sm":757,"fm":757,"tm":757,"am":757,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matelarag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6697},{"i":8498,"cid":"22IL0091","pid":"P00631709VS","t":"Construction of Slope Protection Structure along Ichon-Sindanga-Guinabonan-Maningning Road, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"MACROHON (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"COLLERA CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-04-20","lat":10.135167,"lon":124.953651,"sm":853,"fm":853,"tm":null,"am":900,"md":0.44,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6698},{"i":8499,"cid":"24IJ0062","pid":"P00820419VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Bulao, San Jorge, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN JORGE (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48947871.3,"abc":49000000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-11-11","lat":11.980681,"lon":124.854179,"sm":1297,"fm":1297,"tm":1297,"am":1297,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":3.3,"wp":[11.99533,124.82776],"wst":"matched","br":"Bulao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":33,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.3,"text":"The title names Gandara, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":383},{"i":8500,"cid":"24IF0059","pid":"P00834617VS","t":"Construction of Flood Control Structure (Downstream), Barangay Tabgas, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JM COLLERA KONSTRACT","c":96400000.0,"abc":96500000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-10-18","lat":11.025621,"lon":124.707684,"sm":22,"fm":22,"tm":22,"am":1043,"md":2.93,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabgas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6699},{"i":8501,"cid":"23MH0022","pid":"P00721474MN","t":"Construction of River Bank Protection/Flood Control Barangay Biwang, Bagumbayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"BAGUMBAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / DALANON CONSTRUCTION CORPORATION (FORMERLY:DALANON CONSTRUCTION REF. SUPPLY & SERVICE)","c":41854971.83,"abc":49000000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-10-20","lat":6.619784,"lon":124.581856,"sm":112,"fm":112,"tm":112,"am":112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biwang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6700},{"i":8502,"cid":"23HC0076","pid":"P00721543VS","t":"Construction of Seawall, Bien Unido, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"BIEN UNIDO (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":78399988.26,"abc":78400000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-03-28","lat":10.149814,"lon":124.367132,"sm":201,"fm":201,"tm":201,"am":201,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6701},{"i":8503,"cid":"23M00231","pid":"P00734378MN","t":"Construction of River Bank Protection along Marbel River, Brgy. Namnama, City of Koronadal, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":77101733.66,"abc":310576313.2,"fy":"2023","sd":"08/30/2023","cd":"2024-04-11","lat":6.523376,"lon":124.854652,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.02,"wp":[6.52319,124.85458],"wst":"matched","br":"Namnama","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6702},{"i":8504,"cid":"24KK0024","pid":"P00820255MN","t":"Construction of Flood Control Structure along Dangoan River, Package 2, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":120623945.2,"abc":120625000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-09-16","lat":8.92017,"lon":125.01684,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":"Dangoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6703},{"i":8505,"cid":"24IF0036","pid":"P00821064VS","t":"Construction of Drainage Structure, Brgy. Tabgas, Albuera, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"GMP BUILDERS","c":5433099.16,"abc":5488000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-06-13","lat":10.898087,"lon":124.707742,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tabgas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6704},{"i":8506,"cid":"22KL0049","pid":"P00630484MN","t":"Construction of Flood Control Structure Igpit River (Package 1), Opol, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"OPOL (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":53541974.18,"abc":62725000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-09-01","lat":8.510764,"lon":124.582011,"sm":1039,"fm":1039,"tm":1039,"am":1039,"md":0.0,"ls":"inside","ww":"Igpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[8490,8517],"cl":[],"L":"field","s":36,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0049 to 22KL0051) cover the same site, together worth PHP 172,970,270.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":497},{"i":8507,"cid":"22IL0037","pid":"P00620224VS","t":"Construction of Bogo Flood Control, Sitio Gutosan, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48700120.0,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-12-06","lat":10.158053,"lon":124.854704,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6705},{"i":8508,"cid":"21IM0058","pid":"P00549892VS","t":"Construction of Flood Mitigation Structure and Riverbank Protection, Sangyaw AFP PNP Housing, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tacloban City","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":34471633.72,"abc":34646559.06,"fy":"2021","sd":"05/31/2021","cd":"2022-08-15","lat":11.345552,"lon":124.955349,"sm":1507,"fm":null,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6706},{"i":8509,"cid":"23K00182","pid":"P00721258MN","t":"Construction of Flood Control Structure along Dangoan River, Package 1, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":113079596.3,"abc":114800000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-12-05","lat":8.920233,"lon":125.017011,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":"Dangoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6707},{"i":8510,"cid":"22KE0007","pid":"P00620135MN","t":"Construction of River Control/ Drainage System at Lumad Box Culvert, K63.8+260.00 - K63.8+451.50, K63.8+464.00 - K63.8+538, K63.80+800.00 - K63.8+934.00, Mambajao, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"WDM CONSTRUCTION AND SUPPLIES","c":49000000.0,"abc":48999967.85,"fy":"2022","sd":"05/12/2022","cd":"2023-02-26","lat":9.25218,"lon":124.71406,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6708},{"i":8511,"cid":"22IA0111","pid":"P00633026VS","t":"Rehabilitation of Seawall, Barangay Victory, Caibiran, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":4758246.25,"abc":4895315.06,"fy":"2022","sd":"03/29/2022","cd":"2022-07-31","lat":11.573123,"lon":124.582321,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Victory","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6709},{"i":8512,"cid":"24KE0012","pid":"P00820149MN","t":"Construction of River Control along Mambajao Poblacion Box Culvert, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"TRESTON CONSTRUCTION","c":19005665.26,"abc":19599999.5,"fy":"2024","sd":"07/01/2024","cd":"2024-12-16","lat":9.249675,"lon":124.715843,"sm":907,"fm":907,"tm":null,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6710},{"i":8513,"cid":"24M00219","pid":"P00820923MN","t":"Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"POLOMOLOK (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":120624048.8,"abc":120625000.0,"fy":"2024","sd":"06/27/2024","cd":"2025-02-04","lat":6.252954,"lon":125.017228,"sm":1159,"fm":1159,"tm":1159,"am":1159,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sulit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6711},{"i":8514,"cid":"21I00073","pid":"P00549882VS","t":"Construction of Road Slope Protection Structure, Phase 2, Tacloban By-Pass Extension, Brgy. Cabalawan, Tacloban City","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tacloban City","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":143625981.6,"abc":288816611.2,"fy":"2021","sd":"12/01/2021","cd":"2022-10-25","lat":11.291519,"lon":124.956078,"sm":1507,"fm":null,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabalawan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6712},{"i":8515,"cid":"22HB0093","pid":"P00630217VS","t":"Construction Flood Control Structure, Calmayon River, Poblacion, Jagna, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"JAGNA (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION)","c":48913198.93,"abc":49000000.0,"fy":"2022","sd":"04/18/2022","cd":"2023-02-14","lat":9.64971,"lon":124.36879,"sm":660,"fm":660,"tm":660,"am":660,"md":0.02,"ls":"boundary","ww":"Calmayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6713},{"i":8516,"cid":"24IL0064","pid":"P00821065VS","t":"Construction of Canturing River Flood Control, Brgy. Nasaug, Segment 2, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":48940162.39,"abc":49000000.0,"fy":"2024","sd":"03/13/2024","cd":"2025-01-03","lat":10.138288,"lon":124.855726,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":"Canturing","wn":"Le Canturing River","wd":0.01,"wp":[10.13819,124.85581],"wst":"matched","br":"Nasaug","len":null,"ph":"Segment 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6714},{"i":8517,"cid":"22KL0051","pid":"P00630486MN","t":"Construction of Flood Control Structure Igpit River (Package 3), Opol, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"OPOL (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":62725000.0,"abc":62725000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-12-30","lat":8.504336,"lon":124.582583,"sm":1039,"fm":1039,"tm":1039,"am":1039,"md":0.0,"ls":"inside","ww":"Igpit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[8506,8490],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KL0049 to 22KL0051) cover the same site, together worth PHP 172,970,270.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":455},{"i":8518,"cid":"22IF0071","pid":"P00633240VS","t":"Construction of Palanas Flood Control, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":49499997.74,"abc":49500000.0,"fy":"2022","sd":"03/23/2022","cd":"2023-02-15","lat":10.8825,"lon":124.719444,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6715},{"i":8519,"cid":"22K00120","pid":"P00620029MN","t":"Construction of Flood Control Project along Dangoan River (Downstream), K0+000.00 - K0+397.966, K0+767.565 - K1+101.000, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":126308189.9,"abc":130275000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-08-17","lat":8.91994,"lon":125.01727,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":"Dangoan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6716},{"i":8520,"cid":"23MG0017","pid":"P00732164MN","t":"Construction of Revetment along Marbel River (Namnama Section), Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION / MANUELA CONSTRUCTION SERVICES","c":34299906.85,"abc":34300000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-30","lat":6.522597,"lon":124.856308,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.01,"wp":[6.52253,124.85628],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6717},{"i":8521,"cid":"22FH0023","pid":"P00620734LZ","t":"Construction of Flood Control System Macutal River, Brgy. Macutal, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":47332760.0,"abc":47530000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-11-14","lat":13.678815,"lon":124.370593,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":"System Macutal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Macutal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6718},{"i":8522,"cid":"24IJ0070","pid":"P00835022VS","t":"Construction of Flood Control Structure Brgy Canlapwas, Pagsanghan, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"PAGSANGHAN (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"ETAN CONSTRUCTION","c":19777562.05,"abc":19800000.0,"fy":"2024","sd":"06/03/2024","cd":"2024-12-09","lat":11.965054,"lon":124.719509,"sm":1060,"fm":1060,"tm":1060,"am":1060,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canlapwas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6719},{"i":8523,"cid":"23KK0107","pid":"P00734025MN","t":"Construction of Flood Control Project, Downstream of Dangoan Bridge 3 (Bothsides), Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-03-05","lat":8.920408,"lon":125.01737,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6720},{"i":8524,"cid":"22MF0010","pid":"P00620284MN","t":"Construction of Flood Control Structure, Ala River (Dansuli Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":48714938.9,"abc":48774941.12,"fy":"2022","sd":"02/22/2022","cd":"2022-09-26","lat":6.633108,"lon":124.582614,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8454,8577,8639,8706,8908,8760],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":571},{"i":8525,"cid":"23IJ0021","pid":"P00721803VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Hampton (Hampton Bridge), Gandara, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":52879569.42,"abc":53075000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-09-15","lat":12.108575,"lon":124.857017,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":0.17,"wp":[12.10998,124.85754],"wst":"matched","br":"Hampton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6721},{"i":8526,"cid":"23FH0025","pid":"P00737574LZ","t":"Construction of River Control Structure, Brgy Osmena & Bagong Sirang, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"A.V. LAYNES TRADING AND CONSTRUCTION","c":19800000.0,"abc":19800000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-08-03","lat":13.66454,"lon":124.3708,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Osmena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6722},{"i":8527,"cid":"24IC0076","pid":"P00820890VS","t":"Construction of Flood Control Structure along San Isidro River, Barangay Libertad, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":41469137.1,"abc":41495000.0,"fy":"2024","sd":"04/23/2024","cd":"2024-09-25","lat":11.172538,"lon":124.956342,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Libertad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6723},{"i":8528,"cid":"23K00181","pid":"P00733991MN","t":"Construction of drainage system along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Cagayan De Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"ME 3 CONSTRUCTION","c":47033116.57,"abc":48250000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-12-30","lat":8.477228,"lon":124.720299,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6724},{"i":8529,"cid":"23MH0021","pid":"P00721517MN","t":"Construction of River Bank Protection/Flood Control (Downstream Side) Barangay Biwang, Bagumbayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"BAGUMBAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE)","c":44679385.64,"abc":49000000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-08-30","lat":6.616938,"lon":124.582783,"sm":112,"fm":112,"tm":112,"am":112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biwang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6725},{"i":8530,"cid":"21I00035","pid":"P00521576VS","t":"Construction of Storm Surge Protection: Embarkadero Backwater Dike, Right Bank, Brgy. Buntay, Brgy. Canramos, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94857069.67,"abc":96399566.94,"fy":"2021","sd":"02/22/2021","cd":"2024-01-25","lat":11.10933,"lon":125.018068,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buntay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6726},{"i":8531,"cid":"22IJ0088","pid":"P00633245VS","t":"Rehabilitation of Seawall, Brgy. Magsaysay, Almagro, Western Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"ALMAGRO (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":19684401.73,"abc":19800000.0,"fy":"2022","sd":"03/25/2022","cd":"2022-10-13","lat":11.94593,"lon":124.37334,"sm":44,"fm":44,"tm":44,"am":44,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6727},{"i":8532,"cid":"21I00073","pid":"P00549881VS","t":"Construction of Road Slope Protection Structure, Phase 1, Tacloban By-Pass Extension, Brgy. Cabalawan, Tacloban City","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tacloban City","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":144016391.7,"abc":288816611.2,"fy":"2021","sd":"12/01/2021","cd":"2022-10-25","lat":11.292453,"lon":124.957052,"sm":1507,"fm":null,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabalawan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6728},{"i":8533,"cid":"22HB0010","pid":"P00630191VS","t":"Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 22+647-Sta. 22+695 (Left Side), Sta. 22+640-Sta.22+740 (Right Side),Sta. 24+040-Sta. 24+140 (Left Side), Sta. 24+250-Sta. 24+266 (Left Side), Anda , Bohol","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"BOHOL","mu":"ANDA (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":76929652.14,"abc":76929800.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-21","lat":9.803525,"lon":124.58339,"sm":58,"fm":58,"tm":58,"am":58,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":264.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6729},{"i":8534,"cid":"22IF0001","pid":"P00620196VS","t":"Construction of Palanas Flood Control (Upstream Portion), Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":19599393.93,"abc":19599407.12,"fy":"2022","sd":"02/21/2022","cd":"2022-09-18","lat":10.882115,"lon":124.721305,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6730},{"i":8535,"cid":"23IM0030","pid":"P00721597VS","t":"Construction of Revetment along Barugu-an River (downstream), Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":55353184.87,"abc":55485296.15,"fy":"2023","sd":"03/02/2023","cd":"2023-10-16","lat":11.305008,"lon":124.957321,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Barugu-an","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6731},{"i":8536,"cid":"24II0067","pid":"P00834685VS","t":"Construction of Flood Control Structure in the Municipality of San Roque, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":48989659.89,"abc":48999642.4,"fy":"2024","sd":"04/25/2024","cd":"2024-12-05","lat":12.528425,"lon":124.857569,"sm":1357,"fm":1357,"tm":null,"am":1357,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6732},{"i":8537,"cid":"21K00291","pid":"P00550569MN","t":"Construction of Drainage Open Canal, Brgy. Buayaan, Ditsaan-Ramain, Lanao del Sur","w":"Construction of Drainage Structure","rg":"Region X","pv":"LANAO DEL SUR","mu":"Ditsaan-Ramain","deo":"Lanao del Sur 1st District Engineering Office","co":"MAC CONSTRUCTION","c":7470121.06,"abc":9900000.0,"fy":"2021","sd":"05/23/2022","cd":"2022-09-19","lat":7.969186,"lon":124.373357,"sm":521,"fm":null,"tm":521,"am":521,"md":0.0,"ls":"inside","ww":"Open","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Buayaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6733},{"i":8538,"cid":"22HB0009","pid":"P00630190VS","t":"Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 21+860-Sta. 22+000 (Left Side), Sta. 21+934-Sta.21+989 (Right Side), Anda , Bohol","w":"Construction of Slope Protection Structure","rg":"Region VII","pv":"BOHOL","mu":"ANDA (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"FUENTABUILT CONSTRUCTION CORP. / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION)","c":77199954.39,"abc":77200000.0,"fy":"2022","sd":"04/12/2022","cd":"2022-12-21","lat":9.803028,"lon":124.583612,"sm":58,"fm":58,"tm":58,"am":58,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":195.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6734},{"i":8539,"cid":"24IL0007","pid":"P00820138VS","t":"Construction of Sta. Sofia Flood Control, Padre Burgos, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"PADRE BURGOS (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":61683587.9,"abc":61760000.0,"fy":"2024","sd":"03/13/2024","cd":"2024-11-15","lat":10.027896,"lon":125.018402,"sm":1051,"fm":1051,"tm":1051,"am":1051,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6735},{"i":8540,"cid":"23MG0001","pid":"P00732167MN","t":"Construction of River Bank Protection Structure along Banga River, Barangay San Miguel, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS","c":24499940.38,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-07","lat":6.493623,"lon":124.721943,"sm":1023,"fm":1023,"tm":1023,"am":1023,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.11,"wp":[6.49379,124.72289],"wst":"matched","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6736},{"i":8541,"cid":"22IG0012","pid":"P00620200VS","t":"Construction of Bagalongon Flood Control Structure, Brgy. Balensasayao, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48019930.67,"abc":49000000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-11-30","lat":10.678287,"lon":124.957798,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balensasayao","len":null,"ph":null,"dup":[8548],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 100,302,415.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1108},{"i":8542,"cid":"23IE0062","pid":"P00733313VS","t":"Repair/Rehab of the destroyed slope protection along the Project caused by Typhoon Agaton, San Antonio Homes, Brgy. Linao, San Isidro, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"SAN ISIDRO (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":37443688.48,"abc":37631866.52,"fy":"2023","sd":"05/29/2023","cd":"2024-01-26","lat":11.40721,"lon":124.3774,"sm":1288,"fm":1288,"tm":1288,"am":1288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Linao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6737},{"i":8543,"cid":"22IA0060","pid":"P00630670VS","t":"Construction of Seawall, Barangay Manlabang, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS)","c":4946008.05,"abc":4944855.44,"fy":"2022","sd":"03/16/2022","cd":"2022-08-02","lat":11.566118,"lon":124.584379,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Manlabang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6738},{"i":8544,"cid":"24ME0061","pid":"P00821094MN","t":"Construction of Kling Seawall , Kiamba, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"SHEPPERD CONSTRUCTION AND SUPPLY","c":34298956.6,"abc":34300000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-26","lat":5.936817,"lon":124.722,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6739},{"i":8545,"cid":"21I00032","pid":"P00521577VS","t":"Construction of Storm Surge Protection: Embarkadero Backwater Dike, Right Bank, Barangay Sto. Niño, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94953700.39,"abc":96399560.14,"fy":"2021","sd":"02/22/2021","cd":"2022-12-29","lat":11.100449,"lon":125.018521,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6740},{"i":8546,"cid":"24IL0021","pid":"P00820262VS","t":"Construction of Canturing Mambajao Section Flood Control Structure, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-09","lat":10.129917,"lon":124.857644,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6741},{"i":8547,"cid":"23IA0035","pid":"P00732034VS","t":"Construction of Seawall, Barangay Poblacion, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"MKB BUILDERS AND SUPPLY","c":4817730.0,"abc":4945318.82,"fy":"2023","sd":"02/27/2023","cd":"2023-10-16","lat":11.62028,"lon":124.37801,"sm":45,"fm":45,"tm":45,"am":45,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6742},{"i":8548,"cid":"23IG0046","pid":"P00721911VS","t":"Construction of Bagalongon Flood Control Structure, Barangay Balinsasayao, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":52282484.62,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-12-29","lat":10.678287,"lon":124.957798,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balinsasayao","len":null,"ph":null,"dup":[8541],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 100,302,415.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1093},{"i":8549,"cid":"24KH0039","pid":"P00833586MN","t":"Construction of Drainage at Barangay Carmen, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"CAGALAWAN ENTERPRISES","c":19800000.0,"abc":19800000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-09-15","lat":8.485222,"lon":124.584475,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Carmen","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6743},{"i":8550,"cid":"23KD0003","pid":"P00732484MN","t":"Construction of Flood Control/ Slope Protection, Barangay FS Catanico, Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"BLACK ROAD CONSTRUCTION","c":9519432.69,"abc":9900000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-06-15","lat":8.460236,"lon":124.7243,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"FS Catanico","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6744},{"i":8551,"cid":"21I00036","pid":"P00521572VS","t":"Construction of Storm Surge Protection: Calogcog Backwater Dike, Left Bank, Barangay Buntay, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94857029.25,"abc":96399695.12,"fy":"2021","sd":"02/22/2021","cd":"2023-06-13","lat":11.113056,"lon":125.018889,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buntay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6745},{"i":8552,"cid":"23IL0012","pid":"P00721606VS","t":"Construction of Shoreline Protection Structure - Bdry. So. Leyte - Maasin - Macrohon - Sogod - Jct. Daang Maharlika Rd. - along Maasin City Section, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":84411723.69,"abc":84437500.0,"fy":"2023","sd":"02/21/2023","cd":"2023-12-13","lat":10.12938,"lon":124.857679,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6746},{"i":8553,"cid":"24IC0064","pid":"P00820369VS","t":"Construction of Flood Control along Binahaan River, Barangay Camire, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / XDR CONSTRUCTION AND SUPPLY","c":96450000.44,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-09-14","lat":11.082614,"lon":124.958525,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.08272,124.95843],"wst":"matched","br":"Camire","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6747},{"i":8554,"cid":"22KC0037","pid":"P00620122MN","t":"Construction of Flood Control Structure along CDO City Dominorog Camp Kibaritan Rd (Upstream and Downstream of Tal-uban Bridge) Phase 3, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-03-02","lat":8.150556,"lon":124.585,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6748},{"i":8555,"cid":"23I00086","pid":"P00733289VS","t":"Construction of Revetment along Tigbao River, Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU / AICON INDUSTRIES","c":96381079.66,"abc":96499745.52,"fy":"2023","sd":"05/26/2023","cd":"2024-03-19","lat":11.239429,"lon":124.958589,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Tigbao","wn":"Tigbao River","wd":0.05,"wp":[11.23984,124.95865],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6749},{"i":8556,"cid":"24KD0026","pid":"P00821078MN","t":"Construction of Flood Control Structure along Cugman River, FS Catanico, Cagayan de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"5S DEVELOPMENT CORPORATION","c":19206336.98,"abc":19600000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-09-17","lat":8.460236,"lon":124.724389,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cugman","wn":"Cugman River","wd":0.02,"wp":[8.46037,124.72443],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6750},{"i":8557,"cid":"23I00087","pid":"P00721616VS","t":"Construction of Flood Control Structure, Tigbao River, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU / AICON INDUSTRIES","c":110974526.0,"abc":107474311.5,"fy":"2023","sd":"05/26/2023","cd":"2024-03-19","lat":11.336268,"lon":124.958821,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Tigbao","wn":"Tigbao River","wd":8.41,"wp":[11.26184,124.97446],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":68,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.41,"text":"The title names Tigbao, which OpenStreetMap maps through the stated municipality, but the pin is 8.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"above_budget_ceiling","group":"risk","strength":0.51,"value":1.03257,"text":"Contract cost is 3.26% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":57},{"i":8558,"cid":"24MF0021","pid":"P00820422MN","t":"Construction of Flood Control Structure, Ala River (Kalawag - Dansuli), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":44893181.63,"abc":44938301.06,"fy":"2024","sd":"02/15/2024","cd":"2024-08-25","lat":6.622222,"lon":124.585,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8858,8442,8447,8583,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":597},{"i":8559,"cid":"21I00095","pid":"P00521573VS","t":"Construction of Storm Surge Protection: Calogcog Backwater Dike, Left Bank, Barangay Magay, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":95246996.07,"abc":96209937.62,"fy":"2021","sd":"09/06/2021","cd":"2023-05-21","lat":11.113333,"lon":125.018889,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6751},{"i":8560,"cid":"24IA0012","pid":"P00832667VS","t":"Construction of Seawall, Barangay Poblacion, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"W.B. ALAGAO CONSTRUCTION","c":4850108.5,"abc":4944449.18,"fy":"2024","sd":"02/12/2024","cd":"2024-05-16","lat":11.620709,"lon":124.378119,"sm":45,"fm":45,"tm":45,"am":45,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6752},{"i":8561,"cid":"23II0017","pid":"P00721614VS","t":"Construction of Seawall (Phase I) Along Bantayan Bay, San Roque, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":50411055.55,"abc":50421066.69,"fy":"2023","sd":"03/07/2023","cd":"2023-10-10","lat":12.529798,"lon":124.85916,"sm":1357,"fm":1357,"tm":1357,"am":1357,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6753},{"i":8562,"cid":"22IG0053","pid":"P00633242VS","t":"Construction of Flood Control, Brgy. Poblacion 1, Hindang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"HINDANG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"GREENPLAINS CONSTRUCTION","c":48412000.0,"abc":49500000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-11-12","lat":10.4356,"lon":124.725,"sm":620,"fm":620,"tm":620,"am":620,"md":0.05,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6754},{"i":8563,"cid":"23IA0063","pid":"P00733749VS","t":"Construction of Seawall, Brgy. Bulalacao, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"M.B. ANG CONSTRUCTION & SUPPLY","c":4875580.7,"abc":4945210.24,"fy":"2023","sd":"03/30/2023","cd":"2023-06-12","lat":11.694315,"lon":124.38248,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulalacao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6755},{"i":8564,"cid":"23MB0010","pid":"P00721314MN","t":"Construction of Concrete Revetment, Barangay Simbo, Tupi, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"TUPI (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / SALMEGA BUILDERS","c":50139871.77,"abc":50180000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-09-01","lat":6.248011,"lon":124.960228,"sm":1609,"fm":1609,"tm":1609,"am":1609,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Simbo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6756},{"i":8565,"cid":"23IF0049","pid":"P00731640VS","t":"Construction of Bao Flood Control (Downstream), Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION / RED AXE BUILDERS & SUPPLY","c":96299800.62,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-10-23","lat":11.124643,"lon":124.585002,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6757},{"i":8566,"cid":"23KC0045","pid":"P00721368MN","t":"Construction of Flood Mitigation Structure along Misamis Oriental-Bukidnon-Agusan Road (Downstream) of Siloo Bridge with slope protection, Malitbog, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"MALITBOG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"RAMISES CONSTRUCTION","c":10147900.0,"abc":10147900.0,"fy":"2023","sd":"02/20/2023","cd":"2023-07-30","lat":8.551748,"lon":125.019072,"sm":901,"fm":901,"tm":901,"am":901,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6758},{"i":8567,"cid":"24KH0025","pid":"P00820146MN","t":"Construction of Tambo CIS Protection Dike, Cagayan De Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ALEBON GENUINE MERCHANDISING INCORPORATED","c":12250000.0,"abc":12250000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-07-26","lat":8.290414,"lon":124.585669,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6759},{"i":8568,"cid":"23IG0020","pid":"P00721912VS","t":"Construction of Balinsasayao Flood Control Structure, Barangay Balinsasayao, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":52517168.88,"abc":53075000.0,"fy":"2023","sd":"07/12/2023","cd":"2024-03-12","lat":10.689755,"lon":124.960344,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balinsasayao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6760},{"i":8569,"cid":"24II0039","pid":"P00820253VS","t":"Construction of Seawall along Bantayan Bay, San Roque, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":48919995.76,"abc":48999971.66,"fy":"2024","sd":"02/12/2024","cd":"2024-11-08","lat":12.529286,"lon":124.859728,"sm":1357,"fm":1357,"tm":1357,"am":1357,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6761},{"i":8570,"cid":"22FH0024","pid":"P00620735LZ","t":"Construction of Flood Control System, J.M. Alberto River, Brgy. J.M. Alberto, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":44098760.0,"abc":44100000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-11-17","lat":13.711764,"lon":124.382945,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":"J.M. Alberto","wn":"M. Alberto River","wd":0.0,"wp":[13.71173,124.38293],"wst":"matched","br":"J.M. Alberto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6762},{"i":8571,"cid":"22MD0083","pid":"P00620239MN","t":"Construction of Flood Control Structure, Pulangi River, Brgy. Nabundas Section, Pikit, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIKIT (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. / ABU CONSTRUCTION","c":109671285.0,"abc":109671285.0,"fy":"2022","sd":"05/23/2022","cd":"2023-12-15","lat":7.111394,"lon":124.72676,"sm":1128,"fm":1128,"tm":1128,"am":1128,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":9.02,"wp":[7.14229,124.80235],"wst":"matched","br":"Nabundas Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6763},{"i":8572,"cid":"20I00042","pid":"P00420374VS","t":"Construction of Storm Surge Protection: Heightened Road Tide Embankment, Section 6.3, Tanuan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":96499739.99,"abc":192799217.9,"fy":"2020","sd":"12/03/2020","cd":"2022-10-25","lat":11.113259,"lon":125.019107,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Section 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6764},{"i":8573,"cid":"22IM0053","pid":"P00630688VS","t":"Construction of Flood Control Structure (Drainage System), from Barangay 94-A Basper to Tigbao, Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"ESPERAS CONSTRUCTION & DEVELOPMENT CORP.","c":14550776.82,"abc":14847356.97,"fy":"2022","sd":"02/21/2022","cd":"2022-08-07","lat":11.252018,"lon":124.96035,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"94-A Basper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6765},{"i":8574,"cid":"24IA0040","pid":"P00832666VS","t":"Construction of Flood Control Structure, Sitio Buwaon, Barangay Bunga, Cabucgayan, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":9716102.55,"abc":9894096.29,"fy":"2024","sd":"02/14/2024","cd":"2024-05-30","lat":11.484014,"lon":124.585837,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6766},{"i":8575,"cid":"24IL0059","pid":"P00835032VS","t":"Construction of San Jose Flood Control, San Jose, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"DAV-LEY CONSTRUCTION SERVICES INC. (FORMERLY:DAV-LEY CONSTRUCTION SERVICES)","c":9782580.42,"abc":9800000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-07-03","lat":10.199579,"lon":124.860552,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6767},{"i":8576,"cid":"23I00006","pid":"P00721793VS","t":"Construction of Flood Control Structure along Binahaan River, Barangay Cahumayhumayan, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP.","c":106149990.9,"abc":106148981.9,"fy":"2023","sd":"03/15/2023","cd":"2023-06-30","lat":11.084646,"lon":124.960398,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.08451,124.96045],"wst":"matched","br":"Cahumayhumayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6768},{"i":8577,"cid":"22MF0012","pid":"P00620286MN","t":"Construction of Flood Control Structure, Ala River (Kalawag Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48968970.3,"abc":48968231.47,"fy":"2022","sd":"02/22/2022","cd":"2023-03-24","lat":6.621158,"lon":124.585969,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8524,8454,8639,8706,8908,8760],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":532},{"i":8578,"cid":"24ME0097","pid":"P00835806MN","t":"Construction of Maligang River Control, Kiamba, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"EC SOLICON BUILDERS & SUPPLY, INC.","c":52675000.0,"abc":53075000.0,"fy":"2024","sd":"05/30/2024","cd":"2024-11-25","lat":5.9332,"lon":124.730917,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":"Maligang","wn":"Maligang River","wd":0.02,"wp":[5.9331,124.73101],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6769},{"i":8579,"cid":"22KD0036","pid":"P00632609MN","t":"Construction of Drainage in Brgy. Consolacion, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"NAHARO BUILDERS, INC.","c":4893595.87,"abc":4950000.0,"fy":"2022","sd":"06/08/2022","cd":"2022-11-30","lat":8.292187,"lon":124.3849,"sm":284,"fm":284,"tm":284,"am":633,"md":8.88,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Consolacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":8.88,"text":"The pin is 8.9 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":337},{"i":8580,"cid":"22I00035","pid":"P00620067VS","t":"Construction of Storm Surge Protection: Tide Embankment, Subsection 6.5, Brgy. Buntay, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"888 ACY ENTERPRISES / JGO BUILDERS","c":85641231.29,"abc":85543510.98,"fy":"2022","sd":"03/07/2022","cd":"2023-12-31","lat":11.11317,"lon":125.019244,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buntay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6770},{"i":8581,"cid":"23MG0023","pid":"P00721621MN","t":"Construction of Diversion Channel Projects (Channel 1), Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION / MANUELA CONSTRUCTION SERVICES","c":14673207.7,"abc":39200000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-18","lat":6.48955,"lon":124.86387,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6771},{"i":8582,"cid":"22IM0058","pid":"P00630245VS","t":"Construction of Flood Control Structure (Drainage system), Brgy. 94-A, Phase 2, Basper, Tacloban City","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"DICA CONST. & DEVELOPMENT CORP.","c":14402527.38,"abc":14698851.94,"fy":"2022","sd":"03/04/2022","cd":"2022-08-18","lat":11.250441,"lon":124.962289,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"94-A","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6772},{"i":8583,"cid":"24MF0020","pid":"P00820421MN","t":"Construction of Flood Control Structure, Ala River (Kalawag - Bambad), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":43564921.74,"abc":44934156.54,"fy":"2024","sd":"02/15/2024","cd":"2024-06-14","lat":6.619272,"lon":124.58616,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8858,8442,8447,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":598},{"i":8584,"cid":"22I00032","pid":"P00620055VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 7, Brgy. Calogcog, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"MWJ CONSTRUCTION","c":17154778.04,"abc":17369957.8,"fy":"2022","sd":"02/28/2022","cd":"2022-08-10","lat":11.126389,"lon":125.019268,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calogcog","len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6773},{"i":8585,"cid":"22FH0088","pid":"P00640586LZ","t":"Construction of Seawall  (Phase II), Barangay J.M. Alberto, Baras, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"BARAS (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":9799999.55,"abc":9800000.0,"fy":"2022","sd":"07/14/2022","cd":"2022-10-20","lat":13.710882,"lon":124.385344,"sm":161,"fm":161,"tm":161,"am":161,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"J.M. Alberto","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6774},{"i":8586,"cid":"22IJ0035","pid":"P00630242VS","t":"Construction of Slope Protection Structure along Brgy. Hampton to Brgy. San Jose, Gandara, Samar","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"GANDARA (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"DANILORSO CORP. OPERATING UNDER THE NAME OF DRS BUILDERS AND CONSTRUCTION SUPPLIES","c":19214439.87,"abc":19600000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-09-22","lat":12.104223,"lon":124.865166,"sm":565,"fm":565,"tm":565,"am":565,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hampton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6775},{"i":8587,"cid":"23KC0060","pid":"P00721369MN","t":"Construction of Flood Mitigation Structure along Cagayan de Oro City-Dominorog-Camp Kibaritan Rd (Upstream and Downstream) of Uguiban Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"CYRUS JAMES BUILDERS AND SUPPLIES","c":11760000.0,"abc":11760000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-08-04","lat":8.289658,"lon":124.58678,"sm":1524,"fm":1524,"tm":1524,"am":284,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6776},{"i":8588,"cid":"21I00031","pid":"P00521575VS","t":"Construction of Storm Surge Protection: Embarkadero Backwater Dike, Left Bank, Barangay Sto. Niño, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Tanauan","deo":"Leyte 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":94953612.4,"abc":96399510.65,"fy":"2021","sd":"02/22/2021","cd":"2022-12-28","lat":11.097176,"lon":125.0197,"sm":1540,"fm":null,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6777},{"i":8589,"cid":"23IA0046","pid":"P00733751VS","t":"Construction of Seawall, Brgy. Jamarawon, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"R.K. ENGINEERING & CONSTRUCTION WORKS","c":4911827.07,"abc":4945896.1,"fy":"2023","sd":"04/02/2023","cd":"2023-08-31","lat":11.602429,"lon":124.386527,"sm":45,"fm":45,"tm":45,"am":45,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jamarawon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6778},{"i":8590,"cid":"23KE0046","pid":"P00734022MN","t":"Construction of Balbagon Seawall including Wave Breaker, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":47527222.7,"abc":48999999.32,"fy":"2023","sd":"04/27/2023","cd":"2024-09-01","lat":9.248222,"lon":124.731915,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6779},{"i":8591,"cid":"23IA0028","pid":"P00732037VS","t":"Construction of Seawall, Barangay Bunga, Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"INFRASERVE BUILDERS AND SUPPLIES","c":4825038.4,"abc":4946220.82,"fy":"2023","sd":"02/20/2023","cd":"2023-06-16","lat":11.478598,"lon":124.587528,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6780},{"i":8592,"cid":"23IE0049","pid":"P00733317VS","t":"Construction of Suba Tide Embankment, Brgy. Suba, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754993.65,"abc":48999993.79,"fy":"2023","sd":"04/17/2023","cd":"2023-12-05","lat":11.22237,"lon":124.38681,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Suba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6781},{"i":8593,"cid":"24IM0074","pid":"P00834692VS","t":"Construction of Flood Control Structure, Barangay 104, Salvacion, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"LMKT VALLEY CONSTRUCTION","c":6849543.43,"abc":6858986.04,"fy":"2024","sd":"07/09/2024","cd":"2024-09-30","lat":11.2347,"lon":124.9642,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"104","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6782},{"i":8594,"cid":"22MG0009","pid":"P00620186MN","t":"Construction of Diversion Channel Project (Channel 1), Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"BETTER WORK CONSTRUCTION","c":39184361.82,"abc":39200000.0,"fy":"2022","sd":"03/02/2022","cd":"2022-10-19","lat":6.495556,"lon":124.870556,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Diversion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6783},{"i":8595,"cid":"23KC0129","pid":"P00721263MN","t":"Rehabilitation of Revetment for Tal-Uban Bridge (Downstream) along Cagayan de Oro City - Dominorog - Camp Kibaritan Road, Basak, Talakag, Bukidnon, K1485+460 (B01400MN)","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":7031955.0,"abc":7141260.0,"fy":"2023","sd":"06/26/2023","cd":"2023-11-27","lat":8.150883,"lon":124.587743,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6784},{"i":8596,"cid":"24IF0053","pid":"P00820246VS","t":"Construction of Villaba-Palompon Drainage, Palompon, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALOMPON (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"MAVI CONSTRUCTION INC.","c":9605575.48,"abc":9800000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-11","lat":11.093326,"lon":124.386875,"sm":1071,"fm":1071,"tm":1071,"am":1071,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6785},{"i":8597,"cid":"23IK0027","pid":"P00721588VS","t":"Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBIGA (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"EBS CONSTRUCTION AND SUPPLIES","c":110970734.9,"abc":110974922.1,"fy":"2023","sd":"02/13/2023","cd":"2023-12-04","lat":11.624583,"lon":125.019764,"sm":305,"fm":305,"tm":null,"am":305,"md":0.0,"ls":"inside","ww":"Calbiga","wn":"Calbiga River","wd":0.0,"wp":[11.62459,125.01975],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6786},{"i":8598,"cid":"23IM0046","pid":"P00733327VS","t":"Construction of Revetment along Diit River, Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JGO BUILDERS","c":48539779.74,"abc":48998339.86,"fy":"2023","sd":"03/23/2023","cd":"2023-10-20","lat":11.264015,"lon":124.965783,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Diit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6787},{"i":8599,"cid":"24IE0038","pid":"P00820235VS","t":"Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754999.82,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-09-17","lat":11.22765,"lon":124.38767,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6788},{"i":8600,"cid":"23MG0012","pid":"P00732094MN","t":"Construction of River Bank Protection along Marbel River, Brgy. Sto. Niño, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"VYS CONSTRUCTION","c":28949945.96,"abc":28950000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-10-25","lat":6.496947,"lon":124.87091,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.03,"wp":[6.49686,124.87067],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6789},{"i":8601,"cid":"24IE0032","pid":"P00820232VS","t":"Construction of Seawall, Barangay Bangkal, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":39099716.63,"abc":39199999.99,"fy":"2024","sd":"02/14/2024","cd":"2024-11-04","lat":11.17352,"lon":124.38797,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangkal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6790},{"i":8602,"cid":"23K00055","pid":"P00721268MN","t":"Construction of Revetment along Agusan River, Package 1, Cagayan de Oro City","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"RAMISES CONSTRUCTION","c":89367869.51,"abc":91675000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-08-05","lat":8.488341,"lon":124.734397,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.03,"wp":[8.48842,124.73464],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6791},{"i":8603,"cid":"23I00027","pid":"P00721570VS","t":"Construction of Storm Surge Protection; Tide Embankment, Subsection 6.13, Barangay Sto Niño, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LANOY CONSTRUCTION","c":89542656.0,"abc":89742656.31,"fy":"2023","sd":"03/16/2023","cd":"2023-12-31","lat":11.09718,"lon":125.0198,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6792},{"i":8604,"cid":"23MG0013","pid":"P00732095MN","t":"Construction of River Bank Protection along Marbel River, Purok Upper Valley, Brgy. Sto. Niño, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":28942551.32,"abc":28950000.0,"fy":"2023","sd":"06/08/2023","cd":"2023-12-07","lat":6.507892,"lon":124.871646,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.02,"wp":[6.50798,124.87153],"wst":"matched","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6793},{"i":8605,"cid":"22KH0030","pid":"P00620382MN","t":"Construction of Flood Mitigation Structure along lponan River, (Canito-An Section), Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":28118087.95,"abc":29400000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-05-30","lat":8.470758,"lon":124.588189,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6794},{"i":8606,"cid":"24IF0044","pid":"P00820247VS","t":"Rehabilitation of Spillway, Barangay Antipolo, Albuera, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":6863307.29,"abc":9408000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-06-12","lat":10.869391,"lon":124.737383,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Antipolo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6795},{"i":8607,"cid":"22IK0033","pid":"P00620221VS","t":"Construction of Flood Control Structure, Silaga Bridge along Daang Maharlika, Brgy. Tulay, Sta. Rita, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SANTA RITA (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":39197942.28,"abc":39199999.41,"fy":"2022","sd":"02/14/2022","cd":"2022-10-02","lat":11.466545,"lon":125.019915,"sm":1402,"fm":1402,"tm":1402,"am":1402,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tulay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6796},{"i":8608,"cid":"23FH0013","pid":"P00737573LZ","t":"Construction of Seawall at Soboc, Viga, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"VIGA (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY)","c":8118000.0,"abc":9900000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-07-10","lat":13.87122,"lon":124.3897,"sm":1630,"fm":1630,"tm":1630,"am":1630,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6797},{"i":8609,"cid":"23IL0043","pid":"P00733764VS","t":"Construction of Flood Control Structures in Barangay Bato 1 to 2, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"DAV-LEY CONSTRUCTION SERVICES INC. (FORMERLY:DAV-LEY CONSTRUCTION SERVICES)","c":4881237.85,"abc":4900000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-06-21","lat":10.177799,"lon":124.872472,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bato 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6798},{"i":8610,"cid":"23IM0056","pid":"P00721915VS","t":"Construction of Revetment along Diit River, Phase 2, Tacloban City","w":"Construction of Revetment","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION) / PYUKEI CONSTRUCTION INC.","c":55433308.96,"abc":55484320.82,"fy":"2023","sd":"04/20/2023","cd":"2023-12-04","lat":11.264099,"lon":124.965943,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Diit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6799},{"i":8611,"cid":"22KC0044","pid":"P00620031MN","t":"Construction of Flood Control Structure along CDO City Dominorog Camp Kibaritan Rd (Upstream and Downstream of Tal-uban Bridge), Phase 2, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-06-12","lat":8.15168,"lon":124.58827,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6800},{"i":8612,"cid":"22KC0036","pid":"P00620125MN","t":"Construction of Flood Control Structure along Maramag Maradugao Road (Downstream), Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-03-02","lat":7.744444,"lon":124.739167,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6801},{"i":8613,"cid":"22I00030","pid":"P00620068VS","t":"Construction of Storm Surge Protection: Tide Embankment, Subsection 6.6, Brgy. San Roque, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":84334716.98,"abc":84997658.71,"fy":"2022","sd":"02/28/2022","cd":"2023-04-30","lat":11.111212,"lon":125.020055,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6802},{"i":8614,"cid":"24IC0063","pid":"P00820368VS","t":"Construction of Flood Control along Binahaan River, Barangay Cahumayhumayan, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) / JGO BUILDERS","c":96414342.2,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-10-21","lat":11.09149,"lon":124.96628,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.0,"wp":[11.0915,124.96628],"wst":"matched","br":"Cahumayhumayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6803},{"i":8615,"cid":"22IF0004","pid":"P00620197VS","t":"Construction of Sabang Flood Control, Palompon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALOMPON (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"A.C. RIVERO DEVELOPMENT CORPORATION","c":29399997.45,"abc":29399600.35,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":11.078981,"lon":124.389729,"sm":1071,"fm":1071,"tm":1071,"am":1071,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6804},{"i":8616,"cid":"22KC0030","pid":"P00620123MN","t":"Construction of Flood Control Structure along CDO City-Dominorog-Camp Kibaritan Road (Upstream & Downstream) of Tal-uban Bridge with Slope Protection, Sta. 0+000.00 - Sta. 0+420.00, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":37728091.79,"abc":49000000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-03-20","lat":8.151111,"lon":124.588333,"sm":1524,"fm":1524,"tm":1524,"am":1524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":420.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6805},{"i":8617,"cid":"21K00294","pid":"P00522298MN","t":"Construction of Flood Control Structure (Package 1) along Saguiaran River, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"Kalilangan","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / C'ZARLES CONSTRUCTION & SUPPLY","c":42600672.19,"abc":88780000.0,"fy":"2021","sd":"08/16/2021","cd":"2022-10-31","lat":7.744737,"lon":124.739323,"sm":693,"fm":null,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6806},{"i":8618,"cid":"23I00015","pid":"P00721567VS","t":"Construction of Storm Surge Protection; Tide Embankment, Subsection 6.10, Barangay San Roque, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":113122740.6,"abc":113247456.4,"fy":"2023","sd":"03/15/2023","cd":"2024-03-17","lat":11.10494,"lon":125.022,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6807},{"i":8619,"cid":"23K00138","pid":"P00721239MN","t":"Construction of Flood Control Structure along Maramag Maradugao (Downstream), Macapantig Bridge with slope protection, Package 3, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":183984802.2,"abc":188000000.0,"fy":"2023","sd":"03/29/2023","cd":"2025-01-31","lat":7.743252,"lon":124.740523,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6808},{"i":8620,"cid":"22IL0025","pid":"P00620223VS","t":"Construction of Bato I Flood Control, Bato I, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999980.89,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-02-27","lat":10.177891,"lon":124.872783,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6809},{"i":8621,"cid":"23IE0010","pid":"P00721713VS","t":"Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48019993.25,"abc":48999993.11,"fy":"2023","sd":"02/12/2023","cd":"2023-08-08","lat":11.22767,"lon":124.38985,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6810},{"i":8622,"cid":"22I00037","pid":"P00620069VS","t":"Construction of Storm Surge Protection: Tide Embankment, Subsection 6.7, Brgy. San Roque, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":84652058.28,"abc":85067153.81,"fy":"2022","sd":"02/28/2022","cd":"2023-01-10","lat":11.110231,"lon":125.022006,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6811},{"i":8623,"cid":"22I00075","pid":"P00620459VS","t":"Construction of Flood Control Mitigation Facilities along Binahaan River, Brgy. Binongtoan Section (Downstream), Sta. 0 + 00 to Sta. 0 + 465, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":95712057.88,"abc":95563231.14,"fy":"2022","sd":"07/19/2022","cd":"2023-10-02","lat":11.092713,"lon":124.967535,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.04,"wp":[11.09279,124.96722],"wst":"matched","br":"Binongtoan Section","len":465.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6812},{"i":8624,"cid":"23IJ0006","pid":"P00721857VS","t":"Construction of Flood Control Structure along Calbayog River (Phase II), Barangay Carmen, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":19572816.61,"abc":19600000.0,"fy":"2023","sd":"02/10/2023","cd":"2023-08-08","lat":12.070505,"lon":124.588656,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Calbayog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Carmen","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6813},{"i":8625,"cid":"21K00294","pid":"P00522299MN","t":"Construction of Flood Control Structure (Package 2) along Saguiaran River, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"Kalilangan","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / C'ZARLES CONSTRUCTION & SUPPLY","c":42628073.21,"abc":88780000.0,"fy":"2021","sd":"08/16/2021","cd":"2022-10-31","lat":7.746339,"lon":124.740691,"sm":693,"fm":null,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6814},{"i":8626,"cid":"21MI0073","pid":"P00522329MN","t":"Construction of Flood Control along M'lang River (Sta. 5+597 - Sta. 5+972), Brgy. Inas, M'lang, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"M'Lang","deo":"Cotabato 3rd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":47654560.49,"abc":48395340.0,"fy":"2021","sd":"05/20/2022","cd":"2022-12-02","lat":6.952205,"lon":124.875452,"sm":836,"fm":null,"tm":836,"am":836,"md":0.0,"ls":"inside","ww":"M'lang","wn":"M'lang River","wd":0.01,"wp":[6.95209,124.87544],"wst":"matched","br":"Inas","len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6815},{"i":8627,"cid":"22IE0064","pid":"P00620417VS","t":"Construction of Tide Protection Embankment, Suba, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754987.6,"abc":48999987.53,"fy":"2022","sd":"06/06/2022","cd":"2022-12-15","lat":11.211132,"lon":124.39017,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6816},{"i":8628,"cid":"23IJ0022","pid":"P00721807VS","t":"Construction of Flood Control Structure along Gandara River at Buenavista Bridge, Barangay Buenavista, San Jorge, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN JORGE (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"CDU CONSTRUCTION","c":53013228.8,"abc":53075000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-08-22","lat":11.97623,"lon":124.87685,"sm":1297,"fm":1297,"tm":1297,"am":1297,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":5.67,"wp":[11.99934,124.83037],"wst":"matched","br":"Buenavista","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.6,"value":5.67,"text":"The title names Gandara, which OpenStreetMap maps through the stated municipality, but the pin is 5.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":317},{"i":8629,"cid":"23IK0017","pid":"P00721590VS","t":"Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SANTA RITA (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)","c":110974893.6,"abc":110974953.7,"fy":"2023","sd":"02/13/2023","cd":"2023-12-16","lat":11.46614,"lon":125.022083,"sm":1402,"fm":1402,"tm":1402,"am":1402,"md":0.0,"ls":"inside","ww":"Silaga","wn":"Silaga River","wd":0.01,"wp":[11.46605,125.02206],"wst":"matched","br":"Tulay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6817},{"i":8630,"cid":"21MH0023","pid":"P00522111MN","t":"Construction of River Bank Protection/Flood Control ( Upstream Side) Brgy. Biwang, Bagumbayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Bagumbayan","deo":"Sultan Kudarat 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":67550000.0,"abc":67550000.0,"fy":"2021","sd":"02/12/2021","cd":"2022-11-02","lat":6.58751,"lon":124.58888,"sm":112,"fm":null,"tm":112,"am":112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biwang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6818},{"i":8631,"cid":"22ID0020","pid":"P00620330VS","t":"Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+000 - Sta. 0+328 (Upstream), Brgy. Abre, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION / BEEROCK ENTERPRISES INCORPORATED","c":48931747.46,"abc":48999996.69,"fy":"2022","sd":"03/23/2022","cd":"2023-04-05","lat":11.080513,"lon":124.877946,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.08035,124.87804],"wst":"matched","br":"Abre","len":328.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6819},{"i":8632,"cid":"22IE0067","pid":"P00631713VS","t":"Construction of Tide Protection Embankment, Brgy. Poblacion del Norte, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48019343.9,"abc":48999330.68,"fy":"2022","sd":"06/06/2022","cd":"2023-03-08","lat":11.21132,"lon":124.39017,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion del Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6820},{"i":8633,"cid":"23MB0007","pid":"P00721311MN","t":"Construction of Concrete Revetment, (South Tupi Bridge), Tupi, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"TUPI (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"AMPLEX CONSTRUCTION AND SUPPLIES","c":53074049.88,"abc":53075000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-12-02","lat":6.313525,"lon":124.967581,"sm":1609,"fm":1609,"tm":1609,"am":1609,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6821},{"i":8634,"cid":"24KL0003","pid":"P00820285MN","t":"Construction of Flood Mitigation Structure along San Antonio River (Upstream of San Antonio Bridge), Package 1, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-07-24","lat":8.691711,"lon":124.740922,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"San Antonio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6822},{"i":8635,"cid":"24KC0010","pid":"P00820145MN","t":"Construction of Flood Mitigation Structure along Cagayan de Oro City-Dominorog-Camp Kibaritan Rd, Downstream of Uguiban Bridge, Talakag, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"TALAKAG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"RAMISES CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-12-26","lat":8.288802,"lon":124.589101,"sm":1524,"fm":1524,"tm":1524,"am":284,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6823},{"i":8636,"cid":"24ID0048","pid":"P00820410VS","t":"Construction of Binahaan Flood Control Structure, Binahaan River Basin (Downstream), Barangay Abre, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"XDR CONSTRUCTION AND SUPPLY","c":48949180.01,"abc":48999487.54,"fy":"2024","sd":"02/22/2024","cd":"2024-10-23","lat":11.080646,"lon":124.877949,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.08039,124.8781],"wst":"matched","br":"Abre","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6824},{"i":8637,"cid":"24KL0004","pid":"P00820286MN","t":"Construction of Flood Mitigation Structure along San Antonio River (Upstream of San Antonio Bridge), Package 2, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-07-25","lat":8.691078,"lon":124.741083,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"San Antonio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6825},{"i":8638,"cid":"23IE0055","pid":"P00733316VS","t":"Construction of Silad Tide Embankment (Left Side), Brgy. Silad, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754995.16,"abc":48999995.14,"fy":"2023","sd":"05/04/2023","cd":"2023-12-05","lat":11.22784,"lon":124.39028,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6826},{"i":8639,"cid":"22MF0013","pid":"P00620287MN","t":"Construction of Flood Control Structure, Ala River (Madanding Section), Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":48833568.47,"abc":48883568.47,"fy":"2022","sd":"02/22/2022","cd":"2022-12-16","lat":6.792536,"lon":124.589442,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8524,8454,8577,8706,8908,8760],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":533},{"i":8640,"cid":"22IC0068","pid":"P00620413VS","t":"Construction of Flood Control along Dapdap River (Sta. 27+137 - Sta. 27+450, Left Side), Brgy. Dapdap, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"A2C ENTERPRISES INC. (FORMERLY: M.G. CORPIN CONSTRUCTION)","c":24444842.56,"abc":24500000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-12-12","lat":11.193619,"lon":124.880444,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Dapdap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dapdap","len":313.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6827},{"i":8641,"cid":"22IE0063","pid":"P00620416VS","t":"Construction of Tide Protection Embankment, Silad Port (Right Side), Brgy. Silad, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48019999.8,"abc":48999999.77,"fy":"2022","sd":"03/25/2022","cd":"2023-01-23","lat":11.22749,"lon":124.39054,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6828},{"i":8642,"cid":"22IG0054","pid":"P00633027VS","t":"Construction of Salog A Flood Control Structure (Downstream), Hilongos, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"HILONGOS (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48436562.36,"abc":49000000.0,"fy":"2022","sd":"03/30/2022","cd":"2022-12-24","lat":10.380662,"lon":124.741802,"sm":617,"fm":617,"tm":617,"am":617,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8649],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6829},{"i":8643,"cid":"22IC0067","pid":"P00620412VS","t":"Construction of Flood Control along Dapdap River (Sta. 27+037 - Sta. 27+350, Right Side), Brgy. Dapdap, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"VHITS D. G. BUILDERS & ENTERPRISES","c":29350002.32,"abc":29400000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-10-11","lat":11.19335,"lon":124.880481,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Dapdap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dapdap","len":313.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6830},{"i":8644,"cid":"24IE0018","pid":"P00820234VS","t":"Construction of Tide Protection Embankment, Barangay Poblacion Del Sur, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":48899918.9,"abc":48999999.49,"fy":"2024","sd":"03/25/2024","cd":"2024-09-03","lat":11.21265,"lon":124.3909,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Del Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6831},{"i":8645,"cid":"23K00154","pid":"P00721264MN","t":"Rehabilitation of Revetment for Siloo River (Downstream) along Misamis Oriental - Bukidnon-Agusan Road, K1463+503, Barangay San Luis, Malitbog, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MALITBOG (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"RAMISES CONSTRUCTION","c":12868659.67,"abc":12923280.0,"fy":"2023","sd":"03/27/2023","cd":"2023-07-30","lat":8.554293,"lon":125.02211,"sm":901,"fm":901,"tm":901,"am":901,"md":0.0,"ls":"inside","ww":"Siloo","wn":"Siloo River","wd":0.03,"wp":[8.55428,125.02186],"wst":"matched","br":"San Luis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6832},{"i":8646,"cid":"22MF0017","pid":"P00620291MN","t":"Construction of Flood Control Structure, Alip River (Libertad Section), Columbio, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"COLUMBIO (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ABU CONSTRUCTION","c":36720677.65,"abc":37681366.27,"fy":"2022","sd":"02/22/2022","cd":"2023-03-30","lat":6.648433,"lon":124.967761,"sm":445,"fm":445,"tm":445,"am":445,"md":0.0,"ls":"inside","ww":"Alip","wn":"Alip River","wd":3.11,"wp":[6.67293,124.98161],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.11,"text":"The title names Alip, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":403},{"i":8647,"cid":"24MF0016","pid":"P00820417MN","t":"Construction of Flood Control Structure, Ala River (Bambad - Kalawag), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY)","c":44883889.43,"abc":44934870.16,"fy":"2024","sd":"02/15/2024","cd":"2024-06-10","lat":6.58875,"lon":124.589781,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8858,8442,8447,8583,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":599},{"i":8648,"cid":"24KC0115","pid":"P00820398MN","t":"Construction of Flood Mitigation Structure along Sayre Highway (Downstream) of Mangima Bridge, Manolo Fortich, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"MANOLO FORTICH (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"BUILDZONE CONSTRUCTION AND SUPPLY","c":6860000.0,"abc":6860000.0,"fy":"2024","sd":"06/21/2024","cd":"2024-12-03","lat":8.376461,"lon":124.880955,"sm":922,"fm":922,"tm":922,"am":922,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6833},{"i":8649,"cid":"23IG0007","pid":"P00721584VS","t":"Construction of Salog A Flood Control Structure (Downstream), Hilongos, leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":50283641.39,"abc":50903750.0,"fy":"2023","sd":"04/04/2023","cd":"2023-12-29","lat":10.380662,"lon":124.741802,"sm":617,"fm":4,"tm":617,"am":617,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8642],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":33.57,"text":"The record contradicts itself: the title and the pin point to Hilongos, Leyte, but the municipality field names Abuyog, Leyte, 34 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":525},{"i":8650,"cid":"24IE0033","pid":"P00820233VS","t":"Construction of Tide Protection Embankment, Barangay Poblacion Del Norte, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":48899611.47,"abc":48999998.0,"fy":"2024","sd":"03/07/2024","cd":"2024-09-03","lat":11.21445,"lon":124.3909,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Del Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6834},{"i":8651,"cid":"22I00045","pid":"P00620066VS","t":"Construction of Storm Surge Protection: Tide Embankment, Subsection 6.4, Brgy. Magay, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"888 ACY ENTERPRISES / JGO BUILDERS","c":58382391.64,"abc":58267835.85,"fy":"2022","sd":"03/07/2022","cd":"2022-10-29","lat":11.115844,"lon":125.022118,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6835},{"i":8652,"cid":"21IE0035","pid":"P00549989VS","t":"Construction of Tide Embankment Protection, Barangay Suba, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Villaba","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":28664998.43,"abc":29399995.42,"fy":"2021","sd":"11/28/2021","cd":"2022-09-01","lat":11.216443,"lon":124.393006,"sm":1631,"fm":null,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Suba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6836},{"i":8653,"cid":"23ID0055","pid":"P00721796VS","t":"Construction of Spur Dikes along Daguitan-Marabong River, Daguitan-Marabong River Basin, Barangay Batug, Dulag, Leyte","w":"Construction of Spur Dike","rg":"Region VIII","pv":"LEYTE","mu":"DULAG (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":63371976.78,"abc":63689999.51,"fy":"2023","sd":"04/26/2023","cd":"2024-03-29","lat":10.95079,"lon":124.96886,"sm":533,"fm":533,"tm":533,"am":681,"md":0.01,"ls":"boundary","ww":"Daguitan-Marabong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6837},{"i":8654,"cid":"22KD0027","pid":"P00631088MN","t":"Construction of Drainage, Barangay Consolacion, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"JAMRAY BUILDERS AND ENTERPRISES","c":4825876.1,"abc":4950000.0,"fy":"2022","sd":"03/28/2022","cd":"2023-10-01","lat":8.275367,"lon":124.393101,"sm":284,"fm":284,"tm":284,"am":633,"md":9.13,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Consolacion","len":null,"ph":null,"dup":[8656],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":9.13,"text":"The pin is 9.1 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,775,876.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":240},{"i":8655,"cid":"23ID0032","pid":"P00721794VS","t":"Construction of Daguitan Flood Control Structure and Drainage system, Daguitan River Basin (Downstream), Burauen, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BURAUEN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":55280408.9,"abc":55487270.16,"fy":"2023","sd":"03/13/2023","cd":"2024-02-24","lat":10.967488,"lon":124.881508,"sm":256,"fm":256,"tm":256,"am":256,"md":0.0,"ls":"inside","ww":"Daguitan","wn":"Daguitan River","wd":0.03,"wp":[10.96722,124.88156],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6838},{"i":8656,"cid":"22KD0049","pid":"P00631087MN","t":"Construction of Drainage, Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"GREEN BUILDER AND ENTERPRISES","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"06/27/2022","cd":"2022-10-28","lat":8.275367,"lon":124.393101,"sm":284,"fm":284,"tm":284,"am":633,"md":9.13,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camaman-an","len":null,"ph":null,"dup":[8654],"run":[],"cl":[],"L":"records","s":46,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":9.13,"text":"The pin is 9.1 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,775,876.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":227},{"i":8657,"cid":"24IC0033","pid":"P00832679VS","t":"Construction of Flood Control Structure (Drainage System), Phase 2, Barangay Canhidoc, Palo, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"G.O.C. BUILDERS","c":29656565.85,"abc":29700000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-08-14","lat":11.143283,"lon":124.969453,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canhidoc","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6839},{"i":8658,"cid":"22IA0034","pid":"P00620158VS","t":"Construction of Bunga Flood Control along Biliran Circumferential road, Cabucgayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CABUCGAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"M.B. ANG CONSTRUCTION & SUPPLY","c":23471039.25,"abc":24474493.5,"fy":"2022","sd":"02/21/2022","cd":"2022-07-30","lat":11.485933,"lon":124.59092,"sm":279,"fm":279,"tm":279,"am":279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6840},{"i":8659,"cid":"23I00017","pid":"P00731642VS","t":"Construction of Salvacion Flood Control (Downstream), Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"COLLERA CONSTRUCTION","c":96362987.12,"abc":96499121.55,"fy":"2023","sd":"03/15/2023","cd":"2023-11-30","lat":10.879269,"lon":124.741874,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6841},{"i":8660,"cid":"23I00106","pid":"P00721609VS","t":"Construction of Shoreline Protection Structure -Daang Maharlika Rd. (S00223LT) - along Sogod Section, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SOGOD (SOUTHERN LEYTE)","deo":"Southern Leyte 2nd District Engineering Office","co":"DYSON CONSTRUCTION AND TRADING CORPORATION / UNIMASTERS CONGLOMERATION, INCORPORATED","c":90709209.85,"abc":90710243.83,"fy":"2023","sd":"06/06/2023","cd":"2024-07-16","lat":10.37103,"lon":125.02262,"sm":1475,"fm":1475,"tm":null,"am":1475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6842},{"i":8661,"cid":"23IF0071","pid":"P00721553VS","t":"Construction of Salvacion Flood Control, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":96499999.16,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-31","lat":10.879167,"lon":124.741944,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6843},{"i":8662,"cid":"22IM0047","pid":"P00630680VS","t":"Construction of Road Slope Protection Structure, Phase VI, Tacloban City - Tacloban City By Pass Road, Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":49473423.01,"abc":49498489.75,"fy":"2022","sd":"03/10/2022","cd":"2022-08-25","lat":11.253333,"lon":124.970278,"sm":1507,"fm":1507,"tm":772,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":45.12,"text":"The record contradicts itself: the municipality field and the pin point to Tacloban City, Leyte, but the title names Leyte, Leyte, 45 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":526},{"i":8663,"cid":"21K00295","pid":"P00522300MN","t":"Construction of Flood Control Structure (Package 3) along Saguiaran River, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"Kalilangan","deo":"Bukidnon 3rd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":42477952.0,"abc":88780000.0,"fy":"2021","sd":"08/16/2021","cd":"2022-10-31","lat":7.747646,"lon":124.742081,"sm":693,"fm":null,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6844},{"i":8664,"cid":"23FH0006","pid":"P00737570LZ","t":"Construction of Seawall at District I, Poblacion, Gigmoto, Catanduanes","w":"Construction of Flood Mitigation Structure","rg":"Region V","pv":"CATANDUANES","mu":"GIGMOTO (CATANDUANES)","deo":"Catanduanes District Engineering Office","co":"NQA CONSTRUCTION & SUPPLY","c":9898760.0,"abc":9899999.27,"fy":"2023","sd":"02/17/2023","cd":"2023-07-26","lat":13.77989,"lon":124.3933,"sm":583,"fm":583,"tm":583,"am":583,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6845},{"i":8665,"cid":"22IM0057","pid":"P00630689VS","t":"Construction of Flood Control Structure (Drainage), from Barangay 87 to Barangay 89 San Jose, Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"MIGHTY A'S CONSTRUCTION & HARDWARE SUPPLY","c":8683212.11,"abc":8905344.97,"fy":"2022","sd":"02/16/2022","cd":"2022-12-22","lat":11.203769,"lon":125.022633,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"87","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6846},{"i":8666,"cid":"23MF0014","pid":"P00721513MN","t":"Construction of Flood Control Structure, Ala River Basin (Panas-Bambad Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY)","c":48840410.28,"abc":48940410.28,"fy":"2023","sd":"02/17/2023","cd":"2023-05-11","lat":6.586197,"lon":124.590958,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6847},{"i":8667,"cid":"24KK0065","pid":"P00836183MN","t":"Construction of Drainage, Brgy. Poblacion, Talisayan, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TALISAYAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"CHIU BUILDERS","c":14850000.0,"abc":14850000.0,"fy":"2024","sd":"05/17/2024","cd":"2025-01-10","lat":8.99891,"lon":124.88306,"sm":1532,"fm":1532,"tm":1532,"am":1532,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6848},{"i":8668,"cid":"23IA0090","pid":"P00733306VS","t":"Construction of Bagombong Flood Control along Biliran Circumferential Road, Phase 5, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":19586246.51,"abc":19585675.56,"fy":"2023","sd":"03/30/2023","cd":"2023-08-21","lat":11.618373,"lon":124.393879,"sm":45,"fm":45,"tm":45,"am":45,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6849},{"i":8669,"cid":"21I00054","pid":"P00549883VS","t":"Construction of Road Slope Protection Structure, Phase IV-A, Tacloban City-Tacloban By-Pass Road, Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"LEYTE","mu":"Leyte","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC.","c":95326942.74,"abc":96401109.29,"fy":"2021","sd":"12/01/2021","cd":"2022-07-15","lat":11.25233,"lon":124.970626,"sm":772,"fm":null,"tm":772,"am":1507,"md":45.17,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"records","s":59,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":45.17,"text":"The pin is 45.2 km outside Leyte, Leyte, the nearest municipality the record claims. It falls in Tacloban City, Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":107},{"i":8670,"cid":"23IJ0007","pid":"P00721802VS","t":"Construction of Flood Control Structure along Calbayog River (Downstream), Barangay Dagum, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"CDU CONSTRUCTION","c":57382293.04,"abc":57514000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-11-29","lat":12.075,"lon":124.591111,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Calbayog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dagum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6850},{"i":8671,"cid":"21IE0025","pid":"P00549987VS","t":"Construction of Caigit Flood Control, Caigit, Villaba Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":null,"deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":19011989.81,"abc":19599996.69,"fy":"2021","sd":"11/28/2021","cd":"2022-07-28","lat":11.215374,"lon":124.394155,"sm":null,"fm":null,"tm":null,"am":1631,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":162},{"i":8672,"cid":"22KC0029","pid":"P00620124MN","t":"Construction of Flood Control Structure along Kalilangan Lampanusan Road (Upstream & Downstream) of Malatipay Bridge with Slope Protection, Sta. 0+000.00 - Sta. 0+400.00, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/15/2022","cd":"2023-04-17","lat":7.723333,"lon":124.742222,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6851},{"i":8673,"cid":"22I00051","pid":"P00620283VS","t":"Construction of Daguitan - Marabong Flood Control Structure, Sabang, Dulag, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DULAG (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC. / LANOY CONSTRUCTION","c":96005970.72,"abc":95999969.92,"fy":"2022","sd":"03/07/2022","cd":"2022-12-25","lat":10.935583,"lon":125.023233,"sm":533,"fm":533,"tm":533,"am":533,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6852},{"i":8674,"cid":"22KD0008","pid":"P00631090MN","t":"Construction of Drainage, Barangay Indahag, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"FOUNTAINHEAD CONSTRUCTION AND SUPPLY","c":3655608.55,"abc":4950000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-30","lat":8.262563,"lon":124.394873,"sm":284,"fm":284,"tm":284,"am":633,"md":9.96,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Indahag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":9.96,"text":"The pin is 10.0 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":338},{"i":8675,"cid":"21MB0007","pid":"P00522255MN","t":"Construction of Flood Control Structure along Silway River, Barangay Simbo, Tupi, South Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"Tupi","deo":"South Cotabato 1st District Engineering Office","co":"REYDAN BUILDERS","c":29398635.49,"abc":29400000.0,"fy":"2021","sd":"03/08/2022","cd":"2022-07-28","lat":6.249643,"lon":124.97074,"sm":1609,"fm":null,"tm":1609,"am":1609,"md":0.0,"ls":"inside","ww":"Silway","wn":"Silway River","wd":0.08,"wp":[6.25025,124.97044],"wst":"matched","br":"Simbo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6853},{"i":8676,"cid":"23KK0074","pid":"P00721541MN","t":"Construction of Revetment at Talisayan Bridge (Abutment A and B), Talisayan, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TALISAYAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-03-02","lat":8.993669,"lon":124.88487,"sm":1532,"fm":1532,"tm":1532,"am":1532,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6854},{"i":8677,"cid":"22I00057","pid":"P00620284VS","t":"Construction of Flood Control Structure along Binahaan River, Binahaan River Basin, Right Side Bank, Brgy. Sta. Elena, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":97464803.92,"abc":97363937.65,"fy":"2022","sd":"03/24/2022","cd":"2022-11-09","lat":11.095139,"lon":124.970833,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.01,"wp":[11.09504,124.9709],"wst":"matched","br":"Sta. Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6855},{"i":8678,"cid":"22IF0024","pid":"P00620189VS","t":"Construction of Boac Flood Control, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":19599998.75,"abc":19599938.73,"fy":"2022","sd":"02/21/2022","cd":"2022-07-20","lat":10.858519,"lon":124.743833,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[8684],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 68,449,921.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1133},{"i":8679,"cid":"24IC0051","pid":"P00832678VS","t":"Construction of Flood Control Structure (Drainage System), Phase 1, Barangay Canhidoc, Palo, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"G.O.C. BUILDERS","c":19779330.56,"abc":19800000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-11-05","lat":11.036539,"lon":125.023961,"sm":1070,"fm":1070,"tm":1070,"am":1578,"md":9.85,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Canhidoc","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"records","s":41,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.83,"value":9.85,"text":"The pin is 9.8 km outside Palo, Leyte, the nearest municipality the record claims. It falls in Tolosa, Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":294},{"i":8680,"cid":"23KH0031","pid":"P00721635MN","t":"Construction of Flood Mitigation Structure along Iponan River (Canitoan Section), Cagayan de Oro City - Sta. 0 + 000 - Sta. 0 + 310","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-07-30","lat":8.473333,"lon":124.591667,"sm":284,"fm":284,"tm":null,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.24,"wp":[8.47538,124.59235],"wst":"matched","br":null,"len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6856},{"i":8681,"cid":"24MI0029","pid":"P00820101MN","t":"Construction of M'lang River Flood Control Project (Upstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"M'LANG (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":86849999.38,"abc":86850000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-12-05","lat":6.945281,"lon":124.886425,"sm":836,"fm":836,"tm":836,"am":836,"md":0.0,"ls":"inside","ww":"M'lang","wn":"M'lang River","wd":0.2,"wp":[6.94446,124.88807],"wst":"matched","br":"Poblacion A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6857},{"i":8682,"cid":"24IC0031","pid":"P00832619VS","t":"Construction of Flood Control Structure along San Isidro River, Barangay San Miguelay, Santa Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"ONE MYRNA CONSTRUCTION AND SUPPLY","c":98900000.0,"abc":99000000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-07-22","lat":11.140478,"lon":124.974011,"sm":1384,"fm":1384,"tm":1384,"am":1070,"md":3.98,"ls":"outside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Miguelay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.7,"value":3.98,"text":"The pin is 4.0 km outside Santa Fe, Leyte, the nearest municipality the record claims. It falls in Palo, Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":202},{"i":8683,"cid":"24KK0048","pid":"P00820911MN","t":"Construction of Flood Control Structure, Upstream of Cabug Bridge, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUALYZ TRADING","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-05-29","lat":8.9017,"lon":125.02426,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6858},{"i":8684,"cid":"23IF0079","pid":"P00733318VS","t":"Construction of Flood Control Structure along Boac River, Sitio Naga-Boac, Brgy. Tinag-an, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) / EVERBUILT CONSTRUCTION","c":48849922.65,"abc":49000000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-12-03","lat":10.858519,"lon":124.743833,"sm":22,"fm":22,"tm":22,"am":22,"md":0.0,"ls":"inside","ww":"Boac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tinag-an","len":null,"ph":null,"dup":[8678],"run":[],"cl":[],"L":"field","s":18,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 68,449,921.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1109},{"i":8685,"cid":"22KD0021","pid":"P00631091MN","t":"Construction of Slope Protection, Barangay Bugo, Cagayan de Oro City, Misamis Oriental","w":"Construction of Slope Protection Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"BLACK ROAD CONSTRUCTION","c":4691762.96,"abc":4950000.0,"fy":"2022","sd":"03/16/2022","cd":"2022-10-04","lat":8.295871,"lon":124.395008,"sm":284,"fm":284,"tm":284,"am":633,"md":7.7,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bugo","len":null,"ph":null,"dup":[8691],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.7,"text":"The pin is 7.7 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,592,196.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":241},{"i":8686,"cid":"24IJ0011","pid":"P00821165VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"MATUGUINAO (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"CDU CONSTRUCTION","c":48957864.27,"abc":49000000.0,"fy":"2024","sd":"09/03/2024","cd":"2024-11-06","lat":12.144674,"lon":124.886587,"sm":956,"fm":956,"tm":956,"am":956,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":3.7,"wp":[12.11213,124.87866],"wst":"matched","br":"Mabuligon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.7,"text":"The title names Gandara, which OpenStreetMap maps through the stated municipality, but the pin is 3.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":370},{"i":8687,"cid":"22IL0107","pid":"P00620233VS","t":"Construction of Subangdaku Flood Control (Suba - Kanangkaan Section), Sogod, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SOGOD (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":48999998.5,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-03-14","lat":10.432857,"lon":125.025,"sm":1475,"fm":1475,"tm":1475,"am":1475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6859},{"i":8688,"cid":"23M00231","pid":"P00734377MN","t":"Construction of River Bank Protection along Banga River, Brgy. Malaya, Banga, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"BANGA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":75619408.99,"abc":310576313.2,"fy":"2023","sd":"08/30/2023","cd":"2024-04-11","lat":6.468574,"lon":124.743967,"sm":148,"fm":148,"tm":148,"am":148,"md":0.0,"ls":"inside","ww":"Banga","wn":"Banga River","wd":0.08,"wp":[6.46789,124.7438],"wst":"matched","br":"Malaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6860},{"i":8689,"cid":"21K00295","pid":"P00522301MN","t":"Construction of Flood Control Structure (Package 4) along Saguiaran River, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"Kalilangan","deo":"Bukidnon 3rd District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":41781267.84,"abc":88780000.0,"fy":"2021","sd":"08/16/2021","cd":"2022-10-31","lat":7.747918,"lon":124.744262,"sm":693,"fm":null,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6861},{"i":8690,"cid":"22MF0026","pid":"P00630627MN","t":"Construction of Flood Control Structure, Purok Riverside, Brgy. Madanding, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":35511954.62,"abc":36236776.45,"fy":"2022","sd":"02/22/2022","cd":"2023-06-15","lat":6.796112,"lon":124.591733,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madanding","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6862},{"i":8691,"cid":"22KD0046","pid":"P00632608MN","t":"Construction of Drainage in Brgy. Lapasan, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"ZDA CONSTRUCTION AND ENTERPRISES","c":4900433.19,"abc":4950000.0,"fy":"2022","sd":"06/08/2022","cd":"2022-12-22","lat":8.295871,"lon":124.395009,"sm":284,"fm":284,"tm":284,"am":633,"md":7.7,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lapasan","len":null,"ph":null,"dup":[8685],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.7,"text":"The pin is 7.7 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,592,196.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":242},{"i":8692,"cid":"24IC0028","pid":"P00832616VS","t":"Construction of Flood Control Structure (Drainage System and Flood Water Impounding area), Barangay Cangumbang, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC. / GO_SOLID BUILDERS INC.","c":98919330.45,"abc":99000000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-12-16","lat":11.132996,"lon":124.974185,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cangumbang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6863},{"i":8693,"cid":"24KK0066","pid":"P00836184MN","t":"Construction of Drainage, Brgy. San Jose, Talisayan, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TALISAYAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"CHIU BUILDERS","c":9897154.82,"abc":9900000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-11-12","lat":8.99189,"lon":124.88795,"sm":1532,"fm":1532,"tm":1532,"am":1532,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6864},{"i":8694,"cid":"22MB0129","pid":"P00634422MN","t":"Construction of Drainage Structure along National Highway, Polomolok, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"POLOMOLOK (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"CHL CONSTRUCTION & DEVELOPMENT ENTERPRISES, INC.","c":48998762.8,"abc":49000000.0,"fy":"2022","sd":"01/05/2023","cd":"2023-07-08","lat":6.2525,"lon":125.025556,"sm":1159,"fm":1159,"tm":1159,"am":1159,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6865},{"i":8695,"cid":"22MG0006","pid":"P00630625MN","t":"Construction of Riverbank Protection along Marbel River, Brgy. Carpenter Hill, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"NIRVANA CONSTRUCTION & SUPPLIES / FFJJ CONSTRUCTION","c":48999998.25,"abc":98000000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-07","lat":6.450556,"lon":124.888056,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.02,"wp":[6.45045,124.88818],"wst":"matched","br":"Carpenter Hill","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6866},{"i":8696,"cid":"22K00019","pid":"P00630476MN","t":"Construction of Flood Control Structure along Saguiaran River, Kalilangan, Bukidnon, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / TKS BUILDERS & SUPPLIES","c":74899002.44,"abc":77200000.0,"fy":"2022","sd":"04/11/2022","cd":"2024-03-03","lat":7.74914,"lon":124.744302,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6867},{"i":8697,"cid":"22IF0025","pid":"P00620195VS","t":"Construction of Owak Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JV ENTERPRISES","c":29399996.87,"abc":29399426.24,"fy":"2022","sd":"02/21/2022","cd":"2022-10-11","lat":11.025464,"lon":124.59203,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6868},{"i":8698,"cid":"23IA0009","pid":"P00721697VS","t":"Rehabilitation of Anas Flood Control along Biliran Circumferential Road, Phase II, Naval, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":39156323.62,"abc":39156017.32,"fy":"2023","sd":"02/15/2023","cd":"2023-06-21","lat":11.578768,"lon":124.395305,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6869},{"i":8699,"cid":"22KK0006","pid":"P00630589MN","t":"Construction of Flood Control Project, Purok 2, Barangay Maanas, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"IOS CONSTRUCTION SERVICES","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-22","lat":8.888485,"lon":125.025754,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maanas","len":null,"ph":null,"dup":[],"run":[8738,8731],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KK0004 to 22KK0006) cover the same site, together worth PHP 58,800,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":656},{"i":8700,"cid":"22IJ0051","pid":"P00620209VS","t":"Construction of Flood Control Structure along Barruz River, Brgy. Barruz, Matuguinao, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"MATUGUINAO (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48876644.33,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2024-02-19","lat":12.125556,"lon":124.888889,"sm":956,"fm":956,"tm":956,"am":956,"md":0.0,"ls":"inside","ww":"Barruz","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Barruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6870},{"i":8701,"cid":"23KC0057","pid":"P00721372MN","t":"Construction of Flood Control Structure along Sagayaran River (Downstream) of Nabaliwa Bridge with Slope Protection, Pangantucan, Package 1, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"PANGANTUCAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":16684500.0,"abc":16684500.0,"fy":"2023","sd":"02/20/2023","cd":"2023-09-13","lat":7.871483,"lon":124.744434,"sm":1086,"fm":1086,"tm":1086,"am":1086,"md":0.0,"ls":"inside","ww":"Sagayaran","wn":"Sagayaran River","wd":0.01,"wp":[7.87144,124.7445],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6871},{"i":8702,"cid":"22KE0038","pid":"P00620131MN","t":"Construction of River Control along Alangilan Box Culvert, K31 + 000.00 - K31 + 120.00, K31+340 - K31+569.00, Sagay, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"SAGAY (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":43224902.92,"abc":45262279.88,"fy":"2022","sd":"05/21/2022","cd":"2023-05-28","lat":9.10283,"lon":124.74457,"sm":1232,"fm":1232,"tm":1232,"am":1232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6872},{"i":8703,"cid":"23KE0031","pid":"P00721612MN","t":"Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"SAGAY (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":46937543.46,"abc":46944939.33,"fy":"2023","sd":"04/21/2023","cd":"2024-04-30","lat":9.102749,"lon":124.744581,"sm":1232,"fm":1232,"tm":1232,"am":1232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6873},{"i":8704,"cid":"22K00018","pid":"P00630478MN","t":"Construction of Flood Control Structure along Saguiaran River, Kalilangan, Bukidnon, Package 3","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / TKS BUILDERS & SUPPLIES","c":74142798.44,"abc":77200000.0,"fy":"2022","sd":"04/11/2022","cd":"2024-03-03","lat":7.754877,"lon":124.744679,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6874},{"i":8705,"cid":"23IC0119","pid":"P00733290VS","t":"Construction of Bangon Flood Control Structure and Drainage System along Bangon River, Barangay San Jose, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":115759997.6,"abc":115800000.0,"fy":"2023","sd":"07/04/2023","cd":"2024-04-19","lat":11.168666,"lon":124.974249,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Bangon","wn":"Bangon River","wd":0.03,"wp":[11.16853,124.97447],"wst":"matched","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6875},{"i":8706,"cid":"22MF0014","pid":"P00620288MN","t":"Construction of Flood Control Structure, Ala River (Panas-Bambad Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY) / CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":47675700.22,"abc":48659562.83,"fy":"2022","sd":"02/22/2022","cd":"2022-08-09","lat":6.583503,"lon":124.592522,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8524,8454,8577,8639,8908,8760],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":572},{"i":8707,"cid":"22I00018","pid":"P00620056VS","t":"Construction (Completion) of Storm Surge protection: Tide Embankment, Subsection 4.1A, Brgy. San Jose, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":82017181.14,"abc":81943074.78,"fy":"2022","sd":"03/07/2022","cd":"2023-06-10","lat":11.20912,"lon":125.027457,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6876},{"i":8708,"cid":"22MG0013","pid":"P00620097MN","t":"Construction of Riverbank Protection along Marbel River, Brgy. San Roque, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":70866458.53,"abc":70866705.0,"fy":"2022","sd":"03/04/2022","cd":"2022-12-29","lat":6.4475,"lon":124.889722,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.01,"wp":[6.44755,124.88977],"wst":"matched","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6877},{"i":8709,"cid":"22IA0105","pid":"P00620410VS","t":"Construction of Seawall at Brgy. Looc, Caibiran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"CAIBIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"QYT CONSTRUCTION AND SUPPLIES","c":3787170.76,"abc":3916380.76,"fy":"2022","sd":"03/29/2022","cd":"2022-08-10","lat":11.560148,"lon":124.592709,"sm":288,"fm":288,"tm":288,"am":288,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Looc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6878},{"i":8710,"cid":"23IC0113","pid":"P00721980VS","t":"Construction of Flood Control along Binahaan River, Barangay Malaguicay, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":106099988.8,"abc":106150000.0,"fy":"2023","sd":"05/31/2023","cd":"2024-04-29","lat":11.096832,"lon":124.980134,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.09694,124.97988],"wst":"matched","br":"Malaguicay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6879},{"i":8711,"cid":"22K00020","pid":"P00630477MN","t":"Construction of Flood Control Structure along Saguiaran River, Kalilangan, Bukidnon, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / TKS BUILDERS & SUPPLIES","c":74899470.65,"abc":77200000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-07-31","lat":7.751286,"lon":124.745214,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6880},{"i":8712,"cid":"23KK0083","pid":"P00721615MN","t":"Construction of Revetment at Balanakon Bridge (Abutment A and B), Gingoog City, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-11-23","lat":8.718448,"lon":125.028418,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6881},{"i":8713,"cid":"24KE0015","pid":"P00820399MN","t":"Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Road, Alangilan, Sagay, Camiguin","w":"Construction of Drainage Structure","rg":"Region X","pv":"CAMIGUIN","mu":"SAGAY (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION)","c":9505538.46,"abc":9799999.22,"fy":"2024","sd":"02/19/2024","cd":"2024-09-29","lat":9.10608,"lon":124.745872,"sm":1232,"fm":1232,"tm":1232,"am":1232,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6882},{"i":8714,"cid":"22KK0044","pid":"P00634966MN","t":"Construction of Flood Control Project, Purok 5, Barangay Maanas, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ONE NINE ONE TRADING","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-09-10","lat":8.890921,"lon":125.028482,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maanas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6883},{"i":8715,"cid":"23KC0056","pid":"P00721371MN","t":"Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge with Slope Protection, Pangantucan, Package 1, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"PANGANTUCAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":28919800.0,"abc":28919800.0,"fy":"2023","sd":"02/20/2023","cd":"2023-11-08","lat":7.872018,"lon":124.746215,"sm":1086,"fm":1086,"tm":1086,"am":1086,"md":0.0,"ls":"inside","ww":"Sagayaran","wn":"Sagayaran River","wd":0.01,"wp":[7.87197,124.74625],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6884},{"i":8716,"cid":"24IA0032","pid":"P00820223VS","t":"Construction of Flood Control Structure, Barangay Agpangi, Naval, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"MKB BUILDERS AND SUPPLY","c":9791565.03,"abc":9790314.76,"fy":"2024","sd":"02/14/2024","cd":"2024-06-04","lat":11.584179,"lon":124.395416,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Agpangi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6885},{"i":8717,"cid":"23IA0068","pid":"P00721960VS","t":"Construction of Bagongbong Flood Control along Biliran Circumferential Road, Phase V, Almeria, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"ALMERIA (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":14694663.36,"abc":14694210.87,"fy":"2023","sd":"03/09/2023","cd":"2023-10-16","lat":11.619956,"lon":124.395661,"sm":45,"fm":45,"tm":45,"am":45,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6886},{"i":8718,"cid":"24K00134","pid":"P00820020MN","t":"Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge, Package 3, Pangantucan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"PANGANTUCAN (BUKIDNON)","deo":"Bukidnon 4th District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":70727334.57,"abc":72375000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-01-30","lat":7.872026,"lon":124.746434,"sm":1086,"fm":1086,"tm":1086,"am":1086,"md":0.0,"ls":"inside","ww":"Sagayaran","wn":"Sagayaran River","wd":0.01,"wp":[7.87207,124.74639],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6887},{"i":8719,"cid":"22MF0027","pid":"P00630628MN","t":"Construction of Flood Control Structure, Sitio Balanacan, Brgy. Udtong, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":35747834.15,"abc":36244429.84,"fy":"2022","sd":"02/22/2022","cd":"2023-02-06","lat":6.798919,"lon":124.592929,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Udtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6888},{"i":8720,"cid":"22IL0117","pid":"P00633210VS","t":"Construction of Road Slope Protection along Nonok Norte, Maasin City, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JGO BUILDERS","c":69299998.05,"abc":69300000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-06-16","lat":10.219,"lon":124.8903,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6889},{"i":8721,"cid":"23II0019","pid":"P00721718VS","t":"Construction of Las Navas Flood Control Structure and Drainage System, Las Navas River Basin, Las Navas, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAS NAVAS (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JCL CONSTRUCTION AND SUPPLY","c":28171755.08,"abc":28174744.13,"fy":"2023","sd":"02/27/2023","cd":"2023-11-24","lat":12.33919,"lon":125.030158,"sm":757,"fm":757,"tm":757,"am":757,"md":0.0,"ls":"inside","ww":"Las Navas","wn":"Las Navas River","wd":0.02,"wp":[12.33924,125.02995],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6890},{"i":8722,"cid":"23IC0114","pid":"P00721981VS","t":"Construction of Flood Control along Binahaan River, Barangay Sta. Elena, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":106099996.4,"abc":106150000.0,"fy":"2023","sd":"06/29/2023","cd":"2024-05-27","lat":11.097624,"lon":124.980192,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.01,"wp":[11.09759,124.98024],"wst":"matched","br":"Sta. Elena","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6891},{"i":8723,"cid":"24K00133","pid":"P00820019MN","t":"Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge, Package 2, Pangantucan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"PANGANTUCAN (BUKIDNON)","deo":"Bukidnon 4th District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":70821287.43,"abc":72375000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-01-30","lat":7.873539,"lon":124.7466,"sm":1086,"fm":1086,"tm":1086,"am":1086,"md":0.0,"ls":"inside","ww":"Sagayaran","wn":"Sagayaran River","wd":0.01,"wp":[7.87356,124.74672],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6892},{"i":8724,"cid":"22IC0075","pid":"P00633236VS","t":"Construction of Flood Control Structure Along Dungon River, Brgy. Rizal II, Babatngon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"GO_SOLID BUILDERS INC.","c":29679661.26,"abc":29700000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-12-26","lat":11.388852,"lon":124.890497,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":"Dungon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Rizal II","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6893},{"i":8725,"cid":"24MB0003","pid":"P00820204MN","t":"Construction of San Jose CIS Protection Works, General Santos City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":14644747.05,"abc":14700000.0,"fy":"2024","sd":"03/12/2024","cd":"2024-07-22","lat":6.066809,"lon":125.03084,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6894},{"i":8726,"cid":"22MH0024","pid":"P00620094MN","t":"Construction of River Bank Protection/Flood Control (Upstream Side) Brgy. Biwang, Bagumbayan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"BAGUMBAYAN (SULTAN KUDARAT)","deo":"Sultan Kudarat 2nd District Engineering Office","co":"CASTILLANES CONSTRUCTION AND SUPPLY / C.B. GARAY PHILWIDE BUILDERS","c":43632913.5,"abc":62725000.0,"fy":"2022","sd":"03/18/2022","cd":"2023-05-08","lat":6.578639,"lon":124.593258,"sm":112,"fm":112,"tm":112,"am":112,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Biwang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6895},{"i":8727,"cid":"22KB0086","pid":"P00630496MN","t":"Construction of Revetment, Downstream and Upstream of Apolang Bridge (B01389MN) along Kibawe-Kadingilan-Kalilangan Road, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"KIBAWE (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-01","lat":7.569807,"lon":124.981583,"sm":709,"fm":709,"tm":null,"am":709,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6896},{"i":8728,"cid":"22KD0022","pid":"P00631086MN","t":"Construction of Drainage, Barangay 28, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"BLACK ROAD CONSTRUCTION","c":4687588.04,"abc":4950000.0,"fy":"2022","sd":"03/16/2022","cd":"2023-09-21","lat":8.290498,"lon":124.395918,"sm":284,"fm":284,"tm":284,"am":633,"md":7.91,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"28","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":36,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.91,"text":"The pin is 7.9 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":348},{"i":8729,"cid":"22K00028","pid":"P00630479MN","t":"Construction of Flood Control Structure along Saguiaran River, Kalilangan, Bukidnon, Package 4","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"04/11/2022","cd":"2025-03-30","lat":7.757771,"lon":124.747078,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6897},{"i":8730,"cid":"23MG0001","pid":"P00732169MN","t":"Construction of River Bank Protection along Marbel River, Brgy. Carpenter Hill, Koronadal City, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"CITY OF KORONADAL (CAPITAL) (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"REYDAN BUILDERS","c":24442424.42,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-08-07","lat":6.445355,"lon":124.891745,"sm":393,"fm":393,"tm":393,"am":393,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.04,"wp":[6.4456,124.89197],"wst":"matched","br":"Carpenter Hill","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6898},{"i":8731,"cid":"22KK0005","pid":"P00630590MN","t":"Construction of Flood Control Project, Purok 3, Barangay Maanas, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"IOS CONSTRUCTION SERVICES","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-09-17","lat":8.894862,"lon":125.032642,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maanas","len":null,"ph":null,"dup":[],"run":[8738,8699],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KK0004 to 22KK0006) cover the same site, together worth PHP 58,800,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":657},{"i":8732,"cid":"24IE0036","pid":"P00820230VS","t":"Construction of Flood Control Structure (Caigit to Pangas), Barangay Poblacion Del Norte, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754998.58,"abc":48999999.39,"fy":"2024","sd":"02/14/2024","cd":"2024-11-25","lat":11.213052,"lon":124.396343,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Del Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6899},{"i":8733,"cid":"23KL0061","pid":"P00721547MN","t":"Construction of Flood Control Structure along Downstream of Tagoloan Bridge, Package 1, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-10-13","lat":8.556628,"lon":124.747358,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6900},{"i":8734,"cid":"22IH0066","pid":"P00620205VS","t":"Construction of Flood Control Structures along Gebulwangan River, Brgy. Gebulwangan, Catarman, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"RNMK  CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP. (FOR: RNMK CONST. & DEV'T)","c":48273490.24,"abc":48999889.14,"fy":"2022","sd":"02/21/2022","cd":"2022-09-30","lat":12.371963,"lon":124.594659,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":"Gebulwangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gebulwangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6901},{"i":8735,"cid":"24IA0074","pid":"P00834676VS","t":"Rehabilitation of Anas Flood Control, Naval, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":23957986.34,"abc":24488590.31,"fy":"2024","sd":"02/25/2024","cd":"2024-07-28","lat":11.577843,"lon":124.397121,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6902},{"i":8736,"cid":"23IM0081","pid":"P00732052VS","t":"Construction of Drainage Canal, Barangay 91 Abucay, Tacloban City, Leyte, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"ADB DYNAMIC BUILDERS & SUPPLY","c":4916992.38,"abc":4946417.19,"fy":"2023","sd":"06/16/2023","cd":"2023-09-24","lat":11.235553,"lon":124.981646,"sm":1507,"fm":1507,"tm":772,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"91 Abucay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":46.64,"text":"The record contradicts itself: the municipality field and the pin point to Tacloban City, Leyte, but the title names Leyte, Leyte, 47 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":632},{"i":8737,"cid":"24IC0083","pid":"P00821060VS","t":"Construction of Flood Control along Lingayon River, Barangay Lingayon, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"A2C ENTERPRISES INC. (FORMERLY: M.G. CORPIN CONSTRUCTION)","c":48974657.75,"abc":49000000.0,"fy":"2024","sd":"04/26/2024","cd":"2024-10-21","lat":11.191329,"lon":124.893145,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Lingayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lingayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6903},{"i":8738,"cid":"22KK0004","pid":"P00630591MN","t":"Construction of Flood Control Project, Purok 4, Barangay Maanas, Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUALYZ TRADING","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-25","lat":8.894712,"lon":125.032855,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maanas","len":null,"ph":null,"dup":[],"run":[8731,8699],"cl":[],"L":"field","s":31,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22KK0004 to 22KK0006) cover the same site, together worth PHP 58,800,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":658},{"i":8739,"cid":"22K00030","pid":"P00630481MN","t":"Construction of Flood Control Structure along Saguiaran River, Package 6, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":67648074.81,"abc":70445000.0,"fy":"2022","sd":"04/11/2022","cd":"2024-01-28","lat":7.763183,"lon":124.748175,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6904},{"i":8740,"cid":"22IE0062","pid":"P00620187VS","t":"Construction of Tide Protection Embankment, Brgy Silad, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48754999.65,"abc":48999999.77,"fy":"2022","sd":"03/25/2022","cd":"2023-01-23","lat":11.223758,"lon":124.397982,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Silad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6905},{"i":8741,"cid":"21MF0055","pid":"P00522263MN","t":"Construction of Flood Control Structure, Barangay Udtong Proper, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Lambayong","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":45250027.88,"abc":45707637.14,"fy":"2021","sd":"11/23/2021","cd":"2022-10-18","lat":6.807669,"lon":124.598239,"sm":742,"fm":null,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Udtong Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6906},{"i":8742,"cid":"23IC0038","pid":"P00721703VS","t":"Construction of Flood Control Structure along Bangon River, Brgy. Arado, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JGO BUILDERS","c":48509603.99,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-11","lat":11.165497,"lon":124.981648,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Bangon","wn":"Bangon River","wd":0.02,"wp":[11.16569,124.98177],"wst":"matched","br":"Arado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6907},{"i":8743,"cid":"23MC0020","pid":"P00721390MN","t":"Construction of Revetment along New Cebu River, President Roxas, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-09-28","lat":7.096383,"lon":125.036695,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"New Cebu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6908},{"i":8744,"cid":"24KL0034","pid":"P00820252MN","t":"Construction of Flood Control Structure along Cabulig River, Upstream of Cabulig Br. I, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"MIKKIL CONSTRUCTION / VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":95264800.0,"abc":95264800.0,"fy":"2024","sd":"02/05/2024","cd":"2024-10-20","lat":8.657564,"lon":124.748342,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Cabulig","wn":"Cabulig River","wd":0.02,"wp":[8.65778,124.74834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6909},{"i":8745,"cid":"22KB0028","pid":"P00620120MN","t":"Construction of Revetment, Downstream and Upstream of Maramag Bridge along Maramag River, Maramag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"MAFIL BUILDERS, INC. / MORTAR MASTERS & CONCRETE BUILDERS","c":23520000.0,"abc":23520000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-06","lat":7.772652,"lon":124.982441,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Maramag","wn":"Maramag River","wd":2.12,"wp":[7.75377,124.97914],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6910},{"i":8746,"cid":"24HB0023","pid":"P00820183VS","t":"Construction of Flood Control at Alejawan River (Both Sides), Duero and Jagna, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":39199915.31,"abc":39200000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-06-15","lat":9.681944,"lon":124.398333,"sm":532,"fm":532,"tm":null,"am":660,"md":0.05,"ls":"boundary","ww":"Alejawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6911},{"i":8747,"cid":"22MF0025","pid":"P00630626MN","t":"Construction of Flood Control Structure, Barangay Udtong Proper, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":36122315.18,"abc":36222801.53,"fy":"2022","sd":"02/22/2022","cd":"2022-10-27","lat":6.805767,"lon":124.599075,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Udtong Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6912},{"i":8748,"cid":"23IC0110","pid":"P00721963VS","t":"Construction/Rehabilitation of Flood Control Mitigation Facilities along Lingayon River (Lingayon Bridge), Downstream, Brgy. Lingayon, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"RT BUILDERS","c":48000157.14,"abc":48020000.0,"fy":"2023","sd":"04/12/2023","cd":"2023-10-26","lat":11.192164,"lon":124.893513,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Lingayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lingayon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6913},{"i":8749,"cid":"24KB0180","pid":"P00836175MN","t":"Construction of Reinforced Concrete Box Culvert, Barangay Sanipon, Kibawe, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KIBAWE (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"ROJAYME CONSTRUCTION SERVICES","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"06/10/2024","cd":"2024-10-22","lat":7.424056,"lon":125.039271,"sm":709,"fm":709,"tm":709,"am":477,"md":0.22,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sanipon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6914},{"i":8750,"cid":"22K00029","pid":"P00630480MN","t":"Construction of Flood Control Structure along Saguiaran River, Package 5, Kalilangan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / TKS BUILDERS & SUPPLIES","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-07-31","lat":7.758634,"lon":124.748699,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Saguiaran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6915},{"i":8751,"cid":"23IA0036","pid":"P00732042VS","t":"Construction of Flood Control Structure, Barangay Agpangi, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"QYT CONSTRUCTION AND SUPPLIES","c":4793346.1,"abc":4946693.51,"fy":"2023","sd":"02/27/2023","cd":"2023-05-12","lat":11.59133,"lon":124.398678,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Agpangi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6916},{"i":8752,"cid":"22MF0028","pid":"P00630629MN","t":"Construction of Flood Control Structure, Sitio Concepcion, Brgy. Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":37901489.13,"abc":39180365.38,"fy":"2022","sd":"02/22/2022","cd":"2022-10-24","lat":6.812067,"lon":124.599158,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[],"run":[8925,8919],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22MF0028 to 22MF0030) cover the same site, together worth PHP 109,919,887.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":600},{"i":8753,"cid":"22IC0066","pid":"P00620411VS","t":"Construction of Flood Control along Dapdap River (Sta. 25+400 - Sta. 25+713), Brgy. Salvacion Farm, Alangalang, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"R&B LAURINE CONSTRUCTION","c":29350003.78,"abc":29400000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-10-12","lat":11.204808,"lon":124.896117,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":"Dapdap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salvacion Farm","len":313.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6917},{"i":8754,"cid":"22KB0030","pid":"P00620116MN","t":"Construction of Revetment, Downstream and Upstream of Buayan Bridge along Buayan Creek, Quezon, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION &","c":23520000.0,"abc":23520000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-02-20","lat":7.72439,"lon":125.03961,"sm":1189,"fm":1189,"tm":1189,"am":1189,"md":0.0,"ls":"inside","ww":"Buayan","wn":"Buayan Creek","wd":0.01,"wp":[7.72443,125.03952],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6918},{"i":8755,"cid":"23KL0064","pid":"P00721548MN","t":"Construction of Flood Control Structure along Downstream of Tagoloan Bridge, Package 2, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-10-13","lat":8.554511,"lon":124.749097,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6919},{"i":8756,"cid":"24MC0041","pid":"P00820197MN","t":"Construction of Revetment along Marbol River Sta. 22+600 - Sta. 23+000 R/S, Barangay New Cebu, President Roxas, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":48754903.39,"abc":49000000.0,"fy":"2024","sd":"06/07/2024","cd":"2025-03-22","lat":7.102226,"lon":125.041234,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Marbol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"New Cebu","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6920},{"i":8757,"cid":"23HB0161","pid":"P00745642VS","t":"Repair/Rehabllitation of Alejawan River Control (both sides), Duero & Jagna, Bohol, Sta. 0-000 - Sta. 0+250.00 B/S","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"KMCM BUILDERS AND DEVELOPMENT CORPORATION / GICAR CONSTRUCTION, INC.","c":96284961.9,"abc":96285770.0,"fy":"2023","sd":"08/14/2023","cd":"2024-03-06","lat":9.67999,"lon":124.39958,"sm":532,"fm":532,"tm":null,"am":660,"md":0.05,"ls":"boundary","ww":"Alejawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6921},{"i":8758,"cid":"24II0040","pid":"P00820254VS","t":"Rehabilitation of Dale River Control, Dale River Basin, San Roque, Northern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"ESD CRUZ CONSTRUCTION & SUPPLY","c":48958664.15,"abc":48999972.33,"fy":"2024","sd":"04/17/2024","cd":"2024-12-09","lat":12.545858,"lon":124.896764,"sm":1357,"fm":1357,"tm":1357,"am":1357,"md":0.0,"ls":"inside","ww":"Dale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6922},{"i":8759,"cid":"22KB0029","pid":"P00630574MN","t":"Construction of Revetment, Downstream and Upstream of Maramag Bridge along Maramag River, Barangay Base Camp, Maramag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/02/2022","cd":"2022-12-03","lat":7.773619,"lon":124.98259,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Maramag","wn":"Maramag River","wd":2.23,"wp":[7.75377,124.97914],"wst":"matched","br":"Base Camp","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6923},{"i":8760,"cid":"22MF0016","pid":"P00620290MN","t":"Construction of Flood Control Structure, Ala River, Sitio Balanacan (Upstream), Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":48939622.32,"abc":48989889.72,"fy":"2022","sd":"03/21/2022","cd":"2023-04-17","lat":6.802239,"lon":124.599189,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8524,8454,8577,8639,8706,8908],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":534},{"i":8761,"cid":"22IK0019","pid":"P00620219VS","t":"Construction of Flood Control Structure, Balugo Bridge along Daang Maharlika, Brgy. Balugo, San Sebastian, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN SEBASTIAN (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":39198893.41,"abc":39199999.88,"fy":"2022","sd":"02/14/2022","cd":"2022-10-21","lat":11.679805,"lon":125.041378,"sm":1358,"fm":1358,"tm":1358,"am":1358,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balugo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6924},{"i":8762,"cid":"23K00156","pid":"P00721248MN","t":"Construction of Flood Control Structure along Malatipay River, Kalilangan, Bukidnon, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KALILANGAN (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"TKS BUILDERS & SUPPLIES","c":139626673.0,"abc":142174000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-04-14","lat":7.740234,"lon":124.750881,"sm":693,"fm":693,"tm":693,"am":693,"md":0.0,"ls":"inside","ww":"Malatipay","wn":"Malatipay River","wd":0.01,"wp":[7.74014,124.75093],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6925},{"i":8763,"cid":"24IA0088","pid":"P00834674VS","t":"Rehabilitation of Anas Flood Control Structure, Phase 3, barangay Atipolo, Naval, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":19595819.67,"abc":19594249.53,"fy":"2024","sd":"03/13/2024","cd":"2024-08-04","lat":11.574627,"lon":124.399813,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Atipolo","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6926},{"i":8764,"cid":"21MF0049","pid":"P00522262MN","t":"Construction of Flood Control Structure, Sitio Balanacan, Barangay Udtong, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Lambayong","deo":"Sultan Kudarat 1st District Engineering Office","co":"EINS HANA CONSTRUCTION CORPORATION","c":45612941.4,"abc":45712941.45,"fy":"2021","sd":"11/23/2021","cd":"2022-11-02","lat":6.802594,"lon":124.599708,"sm":742,"fm":null,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Udtong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6927},{"i":8765,"cid":"22II0018","pid":"P00620208VS","t":"Rehabilitation/Improvement of Dale River Control, Dale River Basin, San Roque, Northern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"SAN ROQUE (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"ESD CRUZ CONSTRUCTION & SUPPLY","c":48998803.15,"abc":48999924.2,"fy":"2022","sd":"02/11/2022","cd":"2023-01-06","lat":12.545628,"lon":124.896975,"sm":1357,"fm":1357,"tm":1357,"am":1357,"md":0.0,"ls":"inside","ww":"Dale","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6928},{"i":8766,"cid":"22KE0035","pid":"P00620127MN","t":"Construction of Anito River Control, K4 + 063 - K4 + 243, Mambajao, Camiguin","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"CAMIGUIN","mu":"MAMBAJAO (CAPITAL) (CAMIGUIN)","deo":"Camiguin District Engineering Office","co":"GCMG CONSTRUCTION","c":18619950.53,"abc":19599999.82,"fy":"2022","sd":"05/12/2022","cd":"2023-03-30","lat":9.22594,"lon":124.75118,"sm":907,"fm":907,"tm":907,"am":907,"md":0.0,"ls":"inside","ww":"Anito","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6929},{"i":8767,"cid":"24MC0050","pid":"P00820412MN","t":"Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 L/S, Barangay Dagupan, Makilala, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"04/17/2024","cd":"2025-02-17","lat":6.920799,"lon":125.042035,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.0,"wp":[6.92081,125.04201],"wst":"matched","br":"Dagupan","len":800.0,"ph":null,"dup":[8773],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,533,642.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":940},{"i":8768,"cid":"23HB0163","pid":"P00745644VS","t":"Rehabilitation/Reconstruction of Madua River Control, Duero, Bohol, Sta Sta. 0+000 - Sta. 0+500","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION / WTG CONSTRUCTION & DEVELOPMENT CORPORATION","c":96280926.01,"abc":96280945.0,"fy":"2023","sd":"08/11/2023","cd":"2024-04-22","lat":9.69441,"lon":124.40019,"sm":532,"fm":532,"tm":532,"am":532,"md":0.0,"ls":"inside","ww":"Madua","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6930},{"i":8769,"cid":"24IC0061","pid":"P00820366VS","t":"Construction of Flood Control along Binahaan River, Barangay Balud, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION)","c":96440245.88,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-08-19","lat":11.109661,"lon":124.983454,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.10953,124.98366],"wst":"matched","br":"Balud","len":null,"ph":null,"dup":[8774],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,840,114.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":794},{"i":8770,"cid":"23KH0036","pid":"P00734385MN","t":"Construction of Flood Control Structure along Iponan River, Cagayan de Oro City, Package 7","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":24377496.18,"abc":24750000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-11-28","lat":8.498889,"lon":124.6025,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.04,"wp":[8.49924,124.60248],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6931},{"i":8771,"cid":"24IJ0017","pid":"P00820378VS","t":"Construction of Flood Control Structure along Gandara River, Barangay Blanca Aurora, San Jorge, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"SAN JORGE (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"CDU CONSTRUCTION","c":57850536.76,"abc":57900000.0,"fy":"2024","sd":"04/18/2024","cd":"2024-12-17","lat":11.963591,"lon":124.898054,"sm":1297,"fm":1297,"tm":1297,"am":1297,"md":0.0,"ls":"inside","ww":"Gandara","wn":"Gandara River","wd":8.37,"wp":[11.99934,124.83037],"wst":"matched","br":"Blanca Aurora","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":42,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.37,"text":"The title names Gandara, which OpenStreetMap maps through the stated municipality, but the pin is 8.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":282},{"i":8772,"cid":"24K00194","pid":"P00820273MN","t":"Construction of Flood Control Structure along Puerto Creek, Package 1, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"OLISON CORPORATION / MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION","c":110634633.4,"abc":114835000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-04-12","lat":8.495307,"lon":124.751567,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Puerto","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6932},{"i":8773,"cid":"24MC0051","pid":"P00820413MN","t":"Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 R/S, Barangay Luna Norte, Makilala, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"R.D. INTERIOR JUNIOR CONSTRUCTION / ARBY'S BUILDERS AND CONSTRUCTION SUPPLY CORP.","c":48778642.42,"abc":49000000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-12-05","lat":6.920799,"lon":125.042035,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.0,"wp":[6.92081,125.04201],"wst":"matched","br":"Luna Norte","len":800.0,"ph":null,"dup":[8767],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 97,533,642.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":941},{"i":8774,"cid":"24IC0062","pid":"P00820367VS","t":"Construction of Flood Control along Binahaan River, Barangay Binongto-an, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED / TACLOBAN 6500 INC.(FORMERLY:LTZ CONSTRUCTION AND SUPPLY)","c":96399868.3,"abc":96500000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-07-25","lat":11.109661,"lon":124.983454,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.10953,124.98366],"wst":"matched","br":"Binongto-an","len":null,"ph":null,"dup":[8769],"run":[],"cl":[],"L":"field","s":28,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 192,840,114.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":795},{"i":8775,"cid":"21K00275","pid":"P00522065MN","t":"Construction of Flood Control Structure along Iponan River (Phase 2), Brgy. Iponan, Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":26883199.83,"abc":28950000.0,"fy":"2021","sd":"09/06/2021","cd":"2023-03-31","lat":8.487424,"lon":124.603174,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.13,"wp":[8.48622,124.60322],"wst":"matched","br":"Iponan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6933},{"i":8776,"cid":"23IE0035","pid":"P00721965VS","t":"Construction of Flood Mitigation, Barangay Hinabuyan, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"JVM BOLLARD CONSTRUCTION AND SUPPLY","c":19402201.44,"abc":19599998.65,"fy":"2023","sd":"06/20/2023","cd":"2024-02-17","lat":11.23941,"lon":124.40261,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Hinabuyan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6934},{"i":8777,"cid":"23IG0051","pid":"P00721968VS","t":"Construction of Bartolini Flood Control Structure along Bartolini River, Brgy. Caridad, Baybay City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CITY OF BAYBAY (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"C N E CONSTRUCTION","c":28900234.74,"abc":29400000.0,"fy":"2023","sd":"03/23/2023","cd":"2023-10-18","lat":10.837305,"lon":124.751774,"sm":369,"fm":369,"tm":369,"am":369,"md":0.0,"ls":"inside","ww":"Bartolini","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Caridad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6935},{"i":8778,"cid":"22HB0146","pid":"P00642513VS","t":"Repair/Rehabilitaion of San Antonio River Control, Duero, Bohol","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY","c":28948912.26,"abc":28950000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-11-02","lat":9.709267,"lon":124.40672,"sm":532,"fm":532,"tm":532,"am":532,"md":0.0,"ls":"inside","ww":"San Antonio","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6936},{"i":8779,"cid":"24MC0026","pid":"P00820102MN","t":"Construction of Revetment along Marbol River (Phase II) Barangay New Cebu, Pres. Roxas, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":96493871.31,"abc":96500000.0,"fy":"2024","sd":"04/09/2024","cd":"2025-03-19","lat":7.101255,"lon":125.043361,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Marbol","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"New Cebu","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6937},{"i":8780,"cid":"22I00083","pid":"P00620449VS","t":"Construction of Flood Control Structure along Binahaan River, Brgy. Cabalagnan Section (Upstream/Left Bank), Sta. 0 + 000 - Sta. 0 + 621, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"L.N.R. CONSTRUCTION / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)","c":95455345.07,"abc":96306519.04,"fy":"2022","sd":"06/29/2022","cd":"2023-11-06","lat":11.105433,"lon":124.983792,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.10537,124.98362],"wst":"matched","br":"Cabalagnan Section","len":621.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6938},{"i":8781,"cid":"21MF0058","pid":"P00522266MN","t":"Construction of Flood Control Structure, Sitio Concepcion, Barangay Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Lambayong","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":45243240.79,"abc":45710512.44,"fy":"2021","sd":"11/23/2021","cd":"2022-10-18","lat":6.816975,"lon":124.603311,"sm":742,"fm":null,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[],"run":[8903,8945],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0056 to 21MF0058) cover the same site, together worth PHP 135,979,509.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":601},{"i":8782,"cid":"24IF0039","pid":"P00820128VS","t":"Construction of Mahayag Flood Control Structure, Albuera, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALBUERA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"JM COLLERA KONSTRACT","c":96400000.0,"abc":96500000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-08-20","lat":10.85151,"lon":124.752823,"sm":22,"fm":22,"tm":22,"am":369,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6939},{"i":8783,"cid":"23IE0028","pid":"P00721966VS","t":"Rehabilitation of Flood Mitigation in Sitio Caiguit, Barangay Poblacion Del Norte, Villaba, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":14433400.56,"abc":14699996.71,"fy":"2023","sd":"03/09/2023","cd":"2023-05-18","lat":11.21155,"lon":124.4078,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion Del Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6940},{"i":8784,"cid":"23ID0039","pid":"P00721572VS","t":"Construction of Naliwatan Flood Control Structure and drainage system, Naliwatan River Basin, Barangay San Vicente, Tunga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TUNGA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":55480232.43,"abc":55486952.8,"fy":"2023","sd":"04/11/2023","cd":"2024-04-19","lat":11.242525,"lon":124.75382,"sm":1607,"fm":1607,"tm":1607,"am":1607,"md":0.0,"ls":"inside","ww":"Naliwatan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6941},{"i":8785,"cid":"23IK0055","pid":"P00721921VS","t":"Construction of San Andres Flood Control Structure leading to Antiao River, Catbalogan City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CITY OF CATBALOGAN (CAPITAL) (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":57899899.57,"abc":57899998.26,"fy":"2023","sd":"04/18/2023","cd":"2023-09-24","lat":11.785556,"lon":124.898056,"sm":380,"fm":380,"tm":380,"am":380,"md":0.0,"ls":"inside","ww":"Antiao","wn":"Antiao River","wd":0.25,"wp":[11.78693,124.8962],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6942},{"i":8786,"cid":"24KK0059","pid":"P00835779MN","t":"Construction of River Dike at Minlagas Bridge (Abutment A, Upstream and Downstream), Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"04/11/2024","cd":"2024-12-23","lat":8.870155,"lon":125.043595,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6943},{"i":8787,"cid":"23IG0036","pid":"P00721619VS","t":"Construction of Flood Control Structure and Drainage Systems, Hilongos, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"HILONGOS (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"KOUZBARY BUILDERS","c":104982350.0,"abc":106150000.0,"fy":"2023","sd":"02/21/2023","cd":"2024-02-05","lat":10.373712,"lon":124.754367,"sm":617,"fm":617,"tm":617,"am":617,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6944},{"i":8788,"cid":"22KL0040","pid":"P00630593MN","t":"Construction of Flood Control Structure at Gitagum River, Gitagum, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GITAGUM (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":48250000.0,"abc":49000000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-10-23","lat":8.597319,"lon":124.408386,"sm":587,"fm":587,"tm":587,"am":587,"md":0.0,"ls":"inside","ww":"Gitagum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6945},{"i":8789,"cid":"21IG0019","pid":"P00521716VS","t":"Construction of Bito Flood Control Structures, Brgy Picas Norte, Javier, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"Javier","deo":"Leyte 5th District Engineering Office","co":"LANOY CONSTRUCTION","c":38643360.0,"abc":39200000.0,"fy":"2021","sd":"07/27/2021","cd":"2022-07-09","lat":10.770242,"lon":124.984762,"sm":666,"fm":null,"tm":666,"am":666,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Picas Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6946},{"i":8790,"cid":"24MF0048","pid":"P00820922MN","t":"Construction of Flood Control Structure along Ala River Purok Prinsipe, Kolambog, Sultan Kudarat.","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"KANAWAY BUILDERS CORPORATION","c":48112936.13,"abc":48238812.24,"fy":"2024","sd":"05/15/2024","cd":"2024-12-02","lat":6.544651,"lon":124.603356,"sm":653,"fm":653,"tm":null,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6947},{"i":8791,"cid":"24KL0096","pid":"P00820902MN","t":"Construction of Flood Mitigation Structure along Solana River (Downstream of Solana By-Pass Bridge), Package 2, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"03/06/2024","cd":"2025-01-04","lat":8.26855,"lon":124.755405,"sm":665,"fm":665,"tm":665,"am":783,"md":36.45,"ls":"outside","ww":"Solana","wn":"Solana River","wd":39.37,"wp":[8.62343,124.78307],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"records","s":69,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":36.45,"text":"The pin is 36.5 km outside Jasaan, Misamis Oriental, the nearest municipality the record claims. It falls in Libona, Bukidnon.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.88,"value":39.37,"text":"The title names Solana, which OpenStreetMap maps through the stated municipality, but the pin is 39.4 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":52},{"i":8792,"cid":"23IC0040","pid":"P00721855VS","t":"Construction of Flood Control Structure along Binahaan River, Brgy. Baras, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP.","c":48499177.4,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-28","lat":11.111633,"lon":124.987285,"sm":1540,"fm":1540,"tm":1540,"am":1540,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.11172,124.98714],"wst":"matched","br":"Baras","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6948},{"i":8793,"cid":"23I00007","pid":"P00721797VS","t":"Construction of Flood Control structure along Daguitan River Basin, Right Side Bank, Barangay Poblacion, District VI, Burauen, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BURAUEN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":109863168.9,"abc":110974916.5,"fy":"2023","sd":"03/15/2023","cd":"2024-03-13","lat":10.972098,"lon":124.899465,"sm":256,"fm":256,"tm":256,"am":256,"md":0.0,"ls":"inside","ww":"Daguitan","wn":"Daguitan River","wd":0.05,"wp":[10.9717,124.89964],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6949},{"i":8794,"cid":"23KL0073","pid":"P00721543MN","t":"Construction of Flood Control Structure along Alae River (Right Bank) Package 2, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"EQUALYZ TRADING","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-12-16","lat":8.513189,"lon":124.755486,"sm":1518,"fm":1518,"tm":1518,"am":284,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.0,"wp":[8.51323,124.75548],"wst":"matched","br":"Casinglot","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6950},{"i":8795,"cid":"23KH0010","pid":"P00721373MN","t":"Rehabilitation of Iponan Flood Control Works, Revetment (Iponan Bridge I & II - Iponan Bridge III), along Iponan River, Bulua Side, Sta. 1+088.00 - Sta. 1+441.00 with exception, Brgy. Iponan, Cagayan de Oro City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES)","c":24500000.0,"abc":24500000.0,"fy":"2023","sd":"01/30/2023","cd":"2023-09-23","lat":8.499167,"lon":124.603611,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.03,"wp":[8.49945,124.6035],"wst":"matched","br":"Iponan","len":353.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6951},{"i":8796,"cid":"22MC0042","pid":"P00620276MN","t":"Construction of Malasila River Flood Control L/S, Brgy. Bulacanon, Makilala, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48509973.26,"abc":49000000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-11-14","lat":6.925624,"lon":125.045995,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.02,"wp":[6.92574,125.04591],"wst":"matched","br":"Bulacanon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6952},{"i":8797,"cid":"23IE0041","pid":"P00733315VS","t":"Construction of Slope Protection along the Property Line of New Villaba Municipal Building, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":28958998.68,"abc":29399998.66,"fy":"2023","sd":"04/06/2023","cd":"2023-09-18","lat":11.217972,"lon":124.409101,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6953},{"i":8798,"cid":"23KL0071","pid":"P00721542MN","t":"Construction of Flood Control Structure along Alae River (Right Bank) Package 1, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-23","lat":8.513147,"lon":124.757014,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.02,"wp":[8.51298,124.75691],"wst":"matched","br":"Casinglot","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6954},{"i":8799,"cid":"22KH0029","pid":"P00620381MN","t":"Construction of Flood Mitigation Structure along Iponan River (lponan Section), Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RAMISES CONSTRUCTION","c":29399500.5,"abc":29400000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-11-25","lat":8.498995,"lon":124.603693,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.05,"wp":[8.49945,124.6035],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6955},{"i":8800,"cid":"23I00145","pid":"P00721909VS","t":"Construction of Subang Daku Flood Control (Zone 5 Section), Sogod, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SOGOD (SOUTHERN LEYTE)","deo":"Southern Leyte 2nd District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY)","c":48249095.67,"abc":48250000.0,"fy":"2023","sd":"09/11/2023","cd":"2024-05-07","lat":10.38538,"lon":124.98755,"sm":1475,"fm":1475,"tm":1475,"am":1475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6956},{"i":8801,"cid":"24KL0071","pid":"P00820017MN","t":"Construction of Flood Control Structure along Alae River (Right Side), Package 3, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ARCINUE COMM'L CORPORATION / CROWNWORKS CONSTRUCTION INC.","c":125450000.0,"abc":125450000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-09-12","lat":8.511009,"lon":124.757825,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.03,"wp":[8.51071,124.75783],"wst":"matched","br":"Casinglot","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6957},{"i":8802,"cid":"21K00274","pid":"P00522296MN","t":"Construction of Flood Mitigation Structure along Iponan River (Iponan Section), Iponan, Cagayan de Oro City, Sta. 1+885.10 - Sta. 2+183.80","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":73840576.7,"abc":83747525.0,"fy":"2021","sd":"07/23/2021","cd":"2024-03-25","lat":8.49003,"lon":124.603864,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.02,"wp":[8.48996,124.60403],"wst":"matched","br":null,"len":298.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6958},{"i":8803,"cid":"23MC0024","pid":"P00721506MN","t":"Construction of Malasila River Flood Control, Sta. 39 + 600 - Sta. 40 + 770, Sta. 40 + 170 - Sta. 40 + 770, Barangay Bulacanon, Makilala, North Cotabato, Package 2","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"06/21/2023","cd":"2024-03-07","lat":6.925648,"lon":125.046041,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.02,"wp":[6.92577,125.04595],"wst":"matched","br":"Bulacanon","len":1770.0,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6959},{"i":8804,"cid":"23IG0032","pid":"P00721581VS","t":"Construction of Bito Flood Control Structure, Barangay Picas Norte, Javier, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"LANOY CONSTRUCTION","c":52485867.5,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2024-02-27","lat":10.770466,"lon":124.988927,"sm":666,"fm":4,"tm":666,"am":666,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Picas Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6960},{"i":8805,"cid":"22ID0051","pid":"P00620185VS","t":"Construction of Marabong Flood Control Structure and Drainage System, Marabong River Basin, Sta. 0+000 - Sta. 0+300 (Upstream), Burauen, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BURAUEN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":48998557.03,"abc":48999999.44,"fy":"2022","sd":"03/21/2022","cd":"2023-07-05","lat":10.961468,"lon":124.901597,"sm":256,"fm":256,"tm":256,"am":256,"md":0.0,"ls":"inside","ww":"Marabong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6961},{"i":8806,"cid":"21K00273","pid":"P00522067MN","t":"Construction of Flood Mitigation Structure along Iponan River (Iponan Section), Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":28054126.43,"abc":28950000.0,"fy":"2021","sd":"07/23/2021","cd":"2023-12-31","lat":8.49083,"lon":124.604089,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.03,"wp":[8.49072,124.60436],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6962},{"i":8807,"cid":"24IE0012","pid":"P00820231VS","t":"Construction of Flood Control Structure, Barangay Jalas, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":48558999.82,"abc":49000000.0,"fy":"2024","sd":"02/14/2024","cd":"2024-05-28","lat":11.16984,"lon":124.41067,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Jalas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6963},{"i":8808,"cid":"24KD0028","pid":"P00821076MN","t":"Construction of Flood Control Structure along Alae River, Bugo, Cagayan de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"M & L CONSTRUCTION & ENTERPRISES","c":9499999.99,"abc":9800000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-06-25","lat":8.509416,"lon":124.758651,"sm":284,"fm":284,"tm":284,"am":1518,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.0,"wp":[8.5094,124.75863],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6964},{"i":8809,"cid":"24HB0005","pid":"P00820348VS","t":"Construction of Itum River Control, Itum, Duero, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":96019080.53,"abc":96500000.0,"fy":"2024","sd":"03/08/2024","cd":"2025-04-15","lat":9.713505,"lon":124.412282,"sm":532,"fm":532,"tm":532,"am":532,"md":0.0,"ls":"inside","ww":"Itum","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6965},{"i":8810,"cid":"23II0021","pid":"P00721720VS","t":"Construction of Flood Control Structure, Catubig River, Barangay Lenoy-ahan, Catubig, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATUBIG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"MIK AND MEL CONSTRUCTION AND SUPPLY","c":19403506.94,"abc":19599741.7,"fy":"2023","sd":"02/07/2023","cd":"2024-01-25","lat":12.442335,"lon":125.047334,"sm":357,"fm":357,"tm":357,"am":357,"md":0.0,"ls":"inside","ww":"Catubig","wn":"Catubig River","wd":17.03,"wp":[12.28874,125.03683],"wst":"matched","br":"Lenoy-ahan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6966},{"i":8811,"cid":"22ID0044","pid":"P00620335VS","t":"Construction of Marabong Flood Control Structure and Drainage System, Marabong River Basin, Sta. 0+000 - Sta. 0+300 (Downstream), Burauen, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BURAUEN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":48999538.87,"abc":48999999.2,"fy":"2022","sd":"03/21/2022","cd":"2023-03-15","lat":10.961599,"lon":124.901702,"sm":256,"fm":256,"tm":256,"am":256,"md":0.0,"ls":"inside","ww":"Marabong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6967},{"i":8812,"cid":"23IM0028","pid":"P00731696VS","t":"Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"G.O.C. BUILDERS","c":4849444.8,"abc":4898841.95,"fy":"2023","sd":"02/23/2023","cd":"2023-06-20","lat":11.205702,"lon":124.989903,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Tanghas Lirang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6968},{"i":8813,"cid":"24KL0072","pid":"P00820018MN","t":"Construction of Flood Control Structure along Alae River (Right Side), Package 4, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ARCINUE COMM'L CORPORATION / CROWNWORKS CONSTRUCTION INC.","c":125450000.0,"abc":125450000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-10-10","lat":8.510783,"lon":124.760637,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Alae","wn":"Alae River","wd":0.05,"wp":[8.51043,124.76087],"wst":"matched","br":"Casinglot","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6969},{"i":8814,"cid":"22KB0074","pid":"P00620121MN","t":"Construction of Revetment, Downstream and Upstream of Musuan Bridge along Taganibong Creek, Maramag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PHILIPPIANS CDO CONSTRUCTION CORPORATION","c":23520000.0,"abc":23520000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-25","lat":7.869287,"lon":125.047802,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Taganibong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6970},{"i":8815,"cid":"23KH0020","pid":"P00721610MN","t":"Construction of Flood Mitigation Structure along Iponan River (Iponan Section) Phase II, Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/14/2023","cd":"2023-12-21","lat":8.499167,"lon":124.604167,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.06,"wp":[8.49966,124.60389],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6971},{"i":8816,"cid":"23KA0107","pid":"P00732055MN","t":"Construction of Flood Mitigation Structure, Brgy. Poblacion,Impasugong, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"IMPASUG-ONG (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-05-22","lat":8.291666,"lon":124.990585,"sm":637,"fm":637,"tm":637,"am":637,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6972},{"i":8817,"cid":"23IH0116","pid":"P00721585VS","t":"Construction of Mondragon Bantayan Old Road Shore Protection, Mondragon, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"MONDRAGON (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"C. A. CONSTRUCTION AND SUPPLY","c":3914636.25,"abc":3919874.7,"fy":"2023","sd":"08/17/2023","cd":"2023-12-31","lat":12.523058,"lon":124.760982,"sm":986,"fm":986,"tm":986,"am":986,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6973},{"i":8818,"cid":"23ID0025","pid":"P00721795VS","t":"Construction of Marabong Flood Control Structure and Drainage system, Marabong River Basin, Burauen, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BURAUEN (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":55486287.1,"abc":55487499.76,"fy":"2023","sd":"04/11/2023","cd":"2023-12-15","lat":10.960175,"lon":124.90201,"sm":256,"fm":256,"tm":256,"am":256,"md":0.0,"ls":"inside","ww":"Marabong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6974},{"i":8819,"cid":"22MB0015","pid":"P00620240MN","t":"Construction of Flood Mitigation Structure along Marbel-Makar Road (Pagalungan Section), (Apopong-Silway-Sinawal River Basin), Pagalungan, Polomolok, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"POLOMOLOK (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"AMPLEX CONSTRUCTION AND SUPPLIES","c":70968904.86,"abc":70968995.0,"fy":"2022","sd":"03/29/2022","cd":"2022-11-15","lat":6.2275,"lon":125.048056,"sm":1159,"fm":1159,"tm":1159,"am":1159,"md":0.0,"ls":"inside","ww":"Apopong-Silway-Sinawal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6975},{"i":8820,"cid":"23IA0037","pid":"P00732040VS","t":"Construction of Drainage, Sitio Ilawod, Barangay Caraycaray, Naval, Biliran","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"MKB BUILDERS AND SUPPLY","c":4840465.0,"abc":4946821.05,"fy":"2023","sd":"02/27/2023","cd":"2023-08-30","lat":11.551972,"lon":124.413136,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Caraycaray","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6976},{"i":8821,"cid":"21K00276","pid":"P00522295MN","t":"Construction of Flood Mitigation Structure along Iponan River (Canitoan Section), Iponan, Cagayan de Oro City, Sta. 2+316.80 - Sta. 2+666.61","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"DL ENTERPRISES / MORTAR MASTERS & CONCRETE BUILDERS","c":73261616.42,"abc":77200000.0,"fy":"2021","sd":"08/27/2021","cd":"2024-03-25","lat":8.484737,"lon":124.604504,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.1,"wp":[8.48565,124.60472],"wst":"matched","br":null,"len":349.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6977},{"i":8822,"cid":"23K00106","pid":"P00721415MN","t":"Construction of Flood Control Structure at Tagoloan River, Package 6, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RAMISES CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":282250640.7,"abc":289500000.0,"fy":"2023","sd":"02/13/2023","cd":"2025-02-07","lat":8.538704,"lon":124.761891,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.05,"wp":[8.53913,124.76178],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6978},{"i":8823,"cid":"24IL0057","pid":"P00835033VS","t":"Construction of Basak River Control, Basak, Maasin City, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":4892155.47,"abc":4900000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-06-06","lat":10.185786,"lon":124.902588,"sm":397,"fm":397,"tm":397,"am":397,"md":0.0,"ls":"inside","ww":"Basak","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6979},{"i":8824,"cid":"23KB0055","pid":"P00721246MN","t":"Construction of Flood Control System including a Retarding Basin in the Upstream of Kibalagon Creek, Maramag, Bukidnon, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION)","c":52518810.52,"abc":53075000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-11-24","lat":7.8543,"lon":125.0482,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Kibalagon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6980},{"i":8825,"cid":"22IA0025","pid":"P00620162VS","t":"Construction of Caraycaray Flood Control along Biliran Circumferential Road, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":29397165.65,"abc":29396988.67,"fy":"2022","sd":"02/21/2022","cd":"2022-08-13","lat":11.558333,"lon":124.413333,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6981},{"i":8826,"cid":"23IC0056","pid":"P00731682VS","t":"Rehabilitation of Drainage System, Camp Ruperto K. Kangleon, Palo, Leyte","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"Z.A.S. CONSTRUCTION AND SUPPLY (FORMERLY: Z.A.S. CONSTRUCTION)","c":4885000.65,"abc":4900000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-10-06","lat":11.184955,"lon":124.990977,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6982},{"i":8827,"cid":"23M00231","pid":"P00734376MN","t":"Construction of River Bank Protection along Ala River, Brgy. Kolambog, Norala, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"NORALA (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ABU CONSTRUCTION","c":74137420.79,"abc":310576313.2,"fy":"2023","sd":"08/30/2023","cd":"2024-04-11","lat":6.531424,"lon":124.604965,"sm":1023,"fm":1023,"tm":1023,"am":653,"md":1.0,"ls":"boundary","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Kolambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6983},{"i":8828,"cid":"24KL0068","pid":"P00835759MN","t":"Construction of Flood Control Structure along Akae River (Right Bank), Package 5, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / CROWNWORKS CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-10-18","lat":8.509204,"lon":124.762898,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Akae","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casinglot","len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6984},{"i":8829,"cid":"24M00071","pid":"P00820334MN","t":"Construction of Flood Control Dike along Kabacan River (Phase III), Barangay Poblacion, Pres. Roxas, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":96499999.99,"abc":96500000.0,"fy":"2024","sd":"05/17/2024","cd":"2024-12-19","lat":7.142317,"lon":125.048858,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.02,"wp":[7.14211,125.04881],"wst":"matched","br":"Poblacion","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6985},{"i":8830,"cid":"24IA0047","pid":"P00832664VS","t":"Construction of Flood Control Structure, Dispo Road, Barangay Calumpang, Naval, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"ANG YAP BUILDERS AND AGGREGATE SUPPLIES INC.","c":5807387.3,"abc":5934989.62,"fy":"2024","sd":"02/18/2024","cd":"2024-04-22","lat":11.569227,"lon":124.414715,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Calumpang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6986},{"i":8831,"cid":"23IM0047","pid":"P00732053VS","t":"Construction of 2 Box Culverts at Block 17 and 18, Barangay 36-A Imelda Village, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"AGDCON BUILDERS","c":4944375.0,"abc":4947375.47,"fy":"2023","sd":"03/23/2023","cd":"2023-09-05","lat":11.194395,"lon":124.993451,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"36-A Imelda Village","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6987},{"i":8832,"cid":"21K00277","pid":"P00522066MN","t":"Construction of Flood Control Structure along Iponan River, Barangay Canito-An, Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":27213384.44,"abc":28950000.0,"fy":"2021","sd":"09/24/2021","cd":"2022-12-26","lat":8.485445,"lon":124.605155,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.03,"wp":[8.48573,124.60512],"wst":"matched","br":"Canito-An","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6988},{"i":8833,"cid":"24ID0035","pid":"P00820122VS","t":"Construction of Flood Control System, Phase II, Sta. 00+000 - Sta. 0+439, Barangay Astorga, Tunga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TUNGA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":57899999.79,"abc":57900000.0,"fy":"2024","sd":"03/14/2024","cd":"2024-12-13","lat":11.256339,"lon":124.764735,"sm":1607,"fm":1607,"tm":1607,"am":1607,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Astorga","len":439.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6989},{"i":8834,"cid":"24MC0049","pid":"P00820411MN","t":"Construction of Flood Control Dike along Kabacan River, Sta. 42 + 561 - Sta. 42 + 786 L/S, Barangay Labu-o, Pres. Roxas, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48996447.53,"abc":49000000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-12-16","lat":7.141395,"lon":125.0491,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.07,"wp":[7.142,125.04925],"wst":"matched","br":"Labu-o","len":225.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6990},{"i":8835,"cid":"23IC0104","pid":"P00733311VS","t":"Construction of Slope protection/flood mitigation along active creek and low-lying area susceptible to flooding Crown Estate, Brgy. Bobonon, Alangalang , Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ALANGALANG (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION) / PYUKEI CONSTRUCTION INC.","c":48974200.0,"abc":49039200.0,"fy":"2023","sd":"05/24/2023","cd":"2023-12-29","lat":11.189853,"lon":124.902857,"sm":21,"fm":21,"tm":21,"am":21,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bobonon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6991},{"i":8836,"cid":"22IC0073","pid":"P00632038VS","t":"Construction of Flood Control along Tabegui River, Brgy. Villa Magsaysay, Babatngon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JGO BUILDERS","c":49005390.61,"abc":49500000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-03-27","lat":11.360812,"lon":124.906703,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":"Tabegui","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Villa Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6992},{"i":8837,"cid":"23IA0021","pid":"P00721700VS","t":"Construction of Caraycaray Flood Control along Biliran Circumferential Road, Phase V, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":29393468.65,"abc":29393463.85,"fy":"2023","sd":"02/20/2023","cd":"2023-11-11","lat":11.55785,"lon":124.41571,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase V","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6993},{"i":8838,"cid":"23ID0054","pid":"P00721573VS","t":"Construction of Tunga Flood Control Structure and Drainage system, Tunga River Basin, Barangay Astorga, Tunga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TUNGA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":55209715.8,"abc":55487499.19,"fy":"2023","sd":"04/26/2023","cd":"2024-04-13","lat":11.256477,"lon":124.764742,"sm":1607,"fm":1607,"tm":1607,"am":1607,"md":0.0,"ls":"inside","ww":"Tunga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Astorga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6994},{"i":8839,"cid":"23MC0022","pid":"P00721504MN","t":"Construction of Flood Control Dike along Kabacan River R/S, Barangay Labuo, President Roxas, North Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":48510000.0,"abc":48510000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-04-11","lat":7.141395,"lon":125.049475,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.06,"wp":[7.1419,125.04962],"wst":"matched","br":"Labuo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6995},{"i":8840,"cid":"23KH0032","pid":"P00721637MN","t":"Construction of Flood Mitigation Structure along Iponan River, Cagayan de Oro City - Sta. 0 + 000 - Sta. 0 + 310","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":96499465.0,"abc":96500000.0,"fy":"2023","sd":"03/29/2023","cd":"2023-12-22","lat":8.498611,"lon":124.605555,"sm":284,"fm":284,"tm":null,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.05,"wp":[8.49885,124.60597],"wst":"matched","br":null,"len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6996},{"i":8841,"cid":"22K00121","pid":"P00620032MN","t":"Construction of Flood Control Structure along Maayam River, Brgy. Agay-ayan, Sta. 0+000.00 + Sta. 0+245.800, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":95174796.84,"abc":96500000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-11-26","lat":8.860906,"lon":125.050905,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Maayam","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Agay-ayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6997},{"i":8842,"cid":"23IH0120","pid":"P00733322VS","t":"Construction of Flood Control Structures, Barangay Lorenzo, Rosario, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"ROSARIO (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"SAL CONSTRUCTION","c":6853647.94,"abc":6859812.51,"fy":"2023","sd":"07/25/2023","cd":"2023-10-18","lat":12.52212,"lon":124.42092,"sm":1219,"fm":1219,"tm":1219,"am":1219,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lorenzo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6998},{"i":8843,"cid":"22KB0071","pid":"P00620118MN","t":"Construction of Revetment, Downstream and Upstream of Kanapolo Bridge along Kanapolo Creek, Kibawe, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"KIBAWE (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":23520000.0,"abc":23520000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-11-11","lat":7.578733,"lon":124.994698,"sm":709,"fm":709,"tm":709,"am":709,"md":0.0,"ls":"inside","ww":"Kanapolo","wn":"Kanapolo Creek","wd":0.02,"wp":[7.57875,124.99489],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":6999},{"i":8844,"cid":"24KL0067","pid":"P00835760MN","t":"Construction of Flood Control Structure along Akae River (Right Bank), Package 6, Barangay Casinglot, Tagoloan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / CROWNWORKS CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-11-25","lat":8.510796,"lon":124.765026,"sm":1518,"fm":1518,"tm":1518,"am":1518,"md":0.0,"ls":"inside","ww":"Akae","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Casinglot","len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7000},{"i":8845,"cid":"24II0038","pid":"P00820252VS","t":"Construction of Pambujan Flood Control Structure, Pambujan River Basin, Pambujan, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PAMBUJAN (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":48969801.32,"abc":48999915.71,"fy":"2024","sd":"02/12/2024","cd":"2024-09-08","lat":12.547678,"lon":124.906783,"sm":1073,"fm":1073,"tm":1073,"am":1073,"md":0.0,"ls":"inside","ww":"Pambujan","wn":"Pambujan River","wd":0.08,"wp":[12.54751,124.90747],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7001},{"i":8846,"cid":"23MF0062","pid":"P00721648MN","t":"Construction of Flood Control Project, Ala River (Panes Section), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY) / ALPXR CONST. & BLDRS. CORP","c":67360598.33,"abc":67460599.24,"fy":"2023","sd":"06/13/2023","cd":"2024-01-10","lat":6.535378,"lon":124.605714,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7002},{"i":8847,"cid":"22IK0026","pid":"P00620220VS","t":"Construction of Flood Control Structure, Bucalan Br. along Daang Maharlika, Hinabangan, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"HINABANGAN (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"ETAN CONSTRUCTION","c":19598254.88,"abc":19600000.19,"fy":"2022","sd":"02/09/2022","cd":"2022-07-20","lat":11.691944,"lon":125.051739,"sm":618,"fm":618,"tm":618,"am":1358,"md":0.09,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7003},{"i":8848,"cid":"23I00143","pid":"P00721910VS","t":"Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SOGOD (SOUTHERN LEYTE)","deo":"Southern Leyte 2nd District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY)","c":19299932.0,"abc":19300000.0,"fy":"2023","sd":"09/11/2023","cd":"2024-03-28","lat":10.415102,"lon":124.99484,"sm":1475,"fm":1475,"tm":1475,"am":1475,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7004},{"i":8849,"cid":"23KL0075","pid":"P00721545MN","t":"Construction of Flood Control Structure along Solana River (Downstream of Solana Bridge), Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-27","lat":8.630186,"lon":124.765183,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Solana","wn":"Solana River","wd":0.03,"wp":[8.63013,124.76543],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7005},{"i":8850,"cid":"22II0017","pid":"P00620065VS","t":"Construction of Pambujan Flood Control Structure and Drainage System, Pambujan River Basin, Pambujan, Northern Samar","w":"Construction of Spur Dike","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PAMBUJAN (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JBM ENGINEERS AND SUPPLY / CDU CONSTRUCTION","c":77199786.05,"abc":77199579.05,"fy":"2022","sd":"02/21/2022","cd":"2022-12-02","lat":12.544933,"lon":124.906792,"sm":1073,"fm":1073,"tm":1073,"am":1073,"md":0.0,"ls":"inside","ww":"Pambujan","wn":"Pambujan River","wd":0.07,"wp":[12.54528,124.90735],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7006},{"i":8851,"cid":"22KB0082","pid":"P00630575MN","t":"Construction of Revetment, Downstream and Upstream of Steel Bridge along Pulangi River, Barangay Natulongan, Kibawe, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"KIBAWE (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/07/2022","cd":"2022-12-17","lat":7.530877,"lon":125.052095,"sm":709,"fm":709,"tm":709,"am":709,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.08,"wp":[7.53122,125.05276],"wst":"matched","br":"Natulongan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7007},{"i":8852,"cid":"23MG0040","pid":"P00734412MN","t":"Construction of Kolambog Flood Control/Slope Protection (Sheet Piles) along Cotabato-Marbel Road (Allah River, Kolambog Section), South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIKIT (COTABATO (NORTH COTABATO))","deo":"South Cotabato 2nd District Engineering Office","co":"AKV BUILDERS AND CONSTRUCTION SUPPLIES","c":9900000.0,"abc":9900000.0,"fy":"2023","sd":"05/09/2023","cd":"2023-09-07","lat":6.53536,"lon":124.60577,"sm":1128,"fm":1128,"tm":null,"am":653,"md":46.06,"ls":"outside","ww":"Allah","wn":"Allah River","wd":0.17,"wp":[6.53519,124.60424],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"outside_stated_municipality","group":"location","strength":1.0,"value":46.06,"text":"The pin is 46.1 km outside Pikit, Cotabato, the nearest municipality the record claims. It falls in Isulan, Sultan Kudarat.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":253},{"i":8853,"cid":"23IM0032","pid":"P00732054VS","t":"Construction of Flood Control Structure along National Road, Barangay 95 Caibaan, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"ZTATIK BUILDER INC.","c":9714254.25,"abc":9898729.12,"fy":"2023","sd":"05/26/2023","cd":"2023-09-30","lat":11.214115,"lon":124.99499,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"95 Caibaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7008},{"i":8854,"cid":"22KD0020","pid":"P00631089MN","t":"Construction of Drainage, Barangay Cugman, Cagayan de Oro City, Misamis Oriental","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 2nd District Engineering Office","co":"AKC BUILDERS","c":4660068.53,"abc":4950000.0,"fy":"2022","sd":"06/08/2022","cd":"2022-10-14","lat":8.281437,"lon":124.4229,"sm":284,"fm":284,"tm":284,"am":633,"md":6.33,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cugman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":35,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.77,"value":6.33,"text":"The pin is 6.3 km outside Cagayan de Oro City, Misamis Oriental, the nearest municipality the record claims. It falls in Iligan City, Lanao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":362},{"i":8855,"cid":"24KL0002","pid":"P00820287MN","t":"Construction of Flood Mitigation Structure along Solana River (Upstream and Downstream of Solana By-Pass Bridge), Package 1, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"MIKKIL CONSTRUCTION / VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/05/2024","cd":"2024-11-25","lat":8.6302,"lon":124.7652,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Solana","wn":"Solana River","wd":0.03,"wp":[8.63013,124.76543],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7009},{"i":8856,"cid":"22IL0086","pid":"P00632048VS","t":"Construction of Reinforced Concrete Culvert (RCBC) Brgy. Sto. Niño, Macrohon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"CITY OF MAASIN (CAPITAL) (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"3MC KING CIVIL ENGINEERING CONSTRUCTION","c":4936756.85,"abc":4950000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-08-28","lat":10.12257,"lon":124.90835,"sm":853,"fm":397,"tm":853,"am":853,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sto. Niño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7010},{"i":8857,"cid":"23KB0039","pid":"P00721247MN","t":"Construction of Revetment, Downstream and Upstream of Steel Bridge along Pulangi River, Barangay Natulongan, Kibawe, Bukidnon, Package 2","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"KIBAWE (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":53075000.0,"abc":53075000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-12-03","lat":7.5315,"lon":125.0533,"sm":709,"fm":709,"tm":709,"am":709,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.07,"wp":[7.53133,125.05273],"wst":"matched","br":"Natulongan","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7011},{"i":8858,"cid":"24MF0017","pid":"P00820418MN","t":"Construction of Flood Control Structure, Ala River (Bambad - Kolambog), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY)","c":44944137.95,"abc":45011424.73,"fy":"2024","sd":"02/15/2024","cd":"2024-06-21","lat":6.540531,"lon":124.60601,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8442,8447,8583,8558,8863],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":602},{"i":8859,"cid":"22IA0130","pid":"P00644459VS","t":"Repair/ Rehabilitation of Flood Control Structures Damaged by Typhoon \"Odette\" Catmon Flood Control , Brgy. Catmon, Naval, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"ROVING PREMIER CONTRACTORS, INC.","c":28564526.52,"abc":28941113.4,"fy":"2022","sd":"11/10/2022","cd":"2023-01-13","lat":11.5289,"lon":124.425,"sm":1018,"fm":203,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catmon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7012},{"i":8860,"cid":"24KL0069","pid":"P00835766MN","t":"Construction of Flood Control Structure along Solana River (Downstream of Solana Bridge), Phase 2, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-12-18","lat":8.630147,"lon":124.766867,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Solana","wn":"Solana River","wd":0.07,"wp":[8.63077,124.76672],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7013},{"i":8861,"cid":"24IL0019","pid":"P00820258VS","t":"Construction of Baugo Flood Control Structure, Bontoc, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"BONTOC (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC. / ZTATIK BUILDER INC.","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-09","lat":10.391113,"lon":124.909182,"sm":226,"fm":226,"tm":226,"am":226,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7014},{"i":8862,"cid":"23KB0019","pid":"P00721367MN","t":"Construction of Revetment, Upstream of Musuan Bridge along Taganibong Creek, Maramag, Bukidnon, Package 2","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PHILIPPIANS CDO CONSTRUCTION CORPORATION","c":29262806.08,"abc":29400000.0,"fy":"2023","sd":"04/21/2023","cd":"2023-12-16","lat":7.8635,"lon":125.0542,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":"Taganibong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7015},{"i":8863,"cid":"24MF0022","pid":"P00820423MN","t":"Construction of Flood Control Structure, Ala River (Kolambog - Bambad), Isulan, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"ISULAN (CAPITAL) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY)","c":45229031.59,"abc":45279587.22,"fy":"2024","sd":"02/15/2024","cd":"2024-06-15","lat":6.539317,"lon":124.60601,"sm":653,"fm":653,"tm":653,"am":653,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[8328,8647,8858,8442,8447,8583,8558],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":8,"text":"8 contracts with consecutive numbers (24MF0015 to 24MF0022) cover the same site, together worth PHP 358,382,992.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":603},{"i":8864,"cid":"22IE0059","pid":"P00632042VS","t":"Construction of Flood Control, Barangay Cristina, Calubian Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CALUBIAN (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RED AXE BUILDERS & SUPPLY","c":4801994.29,"abc":4899994.93,"fy":"2022","sd":"03/25/2022","cd":"2022-07-27","lat":11.44917,"lon":124.42604,"sm":309,"fm":309,"tm":null,"am":309,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cristina","len":null,"ph":null,"dup":[8874],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,603,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1094},{"i":8865,"cid":"23ME0078","pid":"P00732496MN","t":"Construction of Slope Protection at New Public Market, Maasim, Sarangani","w":"Construction of Slope Protection Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAASIM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"THE TRENDSETTER CONSTRUCTION AND SUPPLY CORP.","c":19792020.81,"abc":19800000.0,"fy":"2023","sd":"08/08/2023","cd":"2024-12-23","lat":5.870483,"lon":124.995818,"sm":838,"fm":838,"tm":838,"am":838,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7016},{"i":8866,"cid":"22IG0038","pid":"P00620063VS","t":"Construction of Marao Flood Control Structure, Marao River Basin, Left Side Bank, Brgy. Guinsangaan, Inopacan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"INOPACAN (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / C N E CONSTRUCTION","c":95520631.32,"abc":96500000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-01-17","lat":10.48499,"lon":124.766926,"sm":645,"fm":645,"tm":645,"am":645,"md":0.0,"ls":"inside","ww":"Marao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guinsangaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7017},{"i":8867,"cid":"23KK0072","pid":"P00721539MN","t":"Construction of Revetment at Tagbocboc Bridge (Abutment A and B), Talisayan, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TALISAYAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2023-12-26","lat":8.980152,"lon":124.911248,"sm":1532,"fm":1532,"tm":1532,"am":1532,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7018},{"i":8868,"cid":"22IL0106","pid":"P00620234VS","t":"Construction of Talisay Flood Control, Libagon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"HINUNANGAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":19599998.8,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2023-06-19","lat":10.295106,"lon":125.054421,"sm":777,"fm":624,"tm":777,"am":777,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":21,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":9.43,"text":"The record contradicts itself: the title and the pin point to Libagon, Southern Leyte, but the municipality field names Hinunangan, Southern Leyte, 9 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":615},{"i":8869,"cid":"23MG0031","pid":"P00721511MN","t":"Construction of River Bank Protection along Ala River, Sitio Panes, Barangay Kolambog, Santo Niño, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SANTO NIÑO (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-11-24","lat":6.528611,"lon":124.606944,"sm":1414,"fm":1414,"tm":1414,"am":653,"md":2.48,"ls":"adjacent","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Kolambog","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7019},{"i":8870,"cid":"23ME0060","pid":"P00734407MN","t":"Construction of Drainage System, Maasim Integrated Transport Terminal Complex, Maasim, Sarangani","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SARANGANI","mu":"MAASIM (SARANGANI)","deo":"Sarangani District Engineering Office","co":"REYDAN BUILDERS","c":49498514.75,"abc":49500000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-06-12","lat":5.869685,"lon":124.996286,"sm":838,"fm":838,"tm":838,"am":838,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7020},{"i":8871,"cid":"22IF0044","pid":"P00620188VS","t":"Construction of Anilao Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":19599995.43,"abc":19599814.46,"fy":"2022","sd":"02/24/2022","cd":"2023-06-19","lat":11.020792,"lon":124.607239,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7021},{"i":8872,"cid":"22IL0024","pid":"P00620222VS","t":"Construction of Amparo Flood Control, Macrohon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"MACROHON (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-07-31","lat":10.094283,"lon":124.914494,"sm":853,"fm":853,"tm":853,"am":853,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7022},{"i":8873,"cid":"23IM0067","pid":"P00731695VS","t":"Construction of Drainage System, Barangay 96, Tigawon 2, Calanipawan, Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"PAFJ CONSTRUCTION AND SUPPLY, INC.","c":9749397.76,"abc":9799559.01,"fy":"2023","sd":"04/19/2023","cd":"2023-08-30","lat":11.19985,"lon":124.996563,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"96","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7023},{"i":8874,"cid":"22IE0060","pid":"P00634059VS","t":"Construction of Flood Control, Phase II, Barangay Cristina, Calubian Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CALUBIAN (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RED AXE BUILDERS & SUPPLY","c":4801991.23,"abc":4899992.87,"fy":"2022","sd":"03/25/2022","cd":"2022-07-27","lat":11.44917,"lon":124.42604,"sm":309,"fm":309,"tm":null,"am":309,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cristina","len":null,"ph":"Phase II","dup":[8864],"run":[],"cl":[],"L":"field","s":19,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 9,603,986.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1095},{"i":8875,"cid":"23KL0067","pid":"P00721546MN","t":"Construction of Flood Control Structure along Solana River (Upstream of Solana Bridge), Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":77200000.0,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-27","lat":8.630106,"lon":124.767119,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Solana","wn":"Solana River","wd":0.07,"wp":[8.63071,124.7673],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7024},{"i":8876,"cid":"23II0015","pid":"P00721586VS","t":"Construction of Catubig Flood Control Structure and Drainage System, Catubig River Basin, Catubig, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATUBIG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JUPA CONSTRUCTION","c":54377358.61,"abc":55487102.33,"fy":"2023","sd":"02/07/2023","cd":"2023-10-24","lat":12.405773,"lon":125.054437,"sm":357,"fm":357,"tm":357,"am":357,"md":0.0,"ls":"inside","ww":"Catubig","wn":"Catubig River","wd":13.09,"wp":[12.28874,125.03683],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7025},{"i":8877,"cid":"23M00083","pid":"P00721471MN","t":"Construction of Flood Control Structure, Ala River Road Dike, Package A - Phase 4, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":106044862.4,"abc":106150000.0,"fy":"2023","sd":"08/30/2023","cd":"2024-08-26","lat":6.684953,"lon":124.608916,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7026},{"i":8878,"cid":"23ID0002","pid":"P00721571VS","t":"Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Mayorga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MAYORGA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":55482311.18,"abc":55487344.49,"fy":"2023","sd":"03/13/2023","cd":"2023-09-18","lat":10.881705,"lon":124.996977,"sm":962,"fm":962,"tm":962,"am":962,"md":0.0,"ls":"inside","ww":"Hibuga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7027},{"i":8879,"cid":"24IA0041","pid":"P00832670VS","t":"Rehabilitation of Flood Control Structure, Barangay Catmon, Naval, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":6775427.7,"abc":6922885.16,"fy":"2024","sd":"02/18/2024","cd":"2024-05-04","lat":11.525613,"lon":124.427761,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catmon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7028},{"i":8880,"cid":"24KL0070","pid":"P00835767MN","t":"Construction of Flood Control Structure along Solana River (Upstream of Solana Bridge), Phase 2, Jasaan, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"JASAAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-12-18","lat":8.630147,"lon":124.768925,"sm":665,"fm":665,"tm":665,"am":665,"md":0.0,"ls":"inside","ww":"Solana","wn":"Solana River","wd":0.01,"wp":[8.63027,124.76895],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7029},{"i":8881,"cid":"23KK0070","pid":"P00721537MN","t":"Construction of Revetment at Lunao Bridge (Abutment A and B), Gingoog City, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2024-03-04","lat":8.851518,"lon":125.05611,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7030},{"i":8882,"cid":"23M00084","pid":"P00721473MN","t":"Construction of Flood Control Structure, Ala River Road Dike, Package B - Phase 3, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"THREE W BUILDERS, INC.","c":110005802.7,"abc":115800000.0,"fy":"2023","sd":"08/29/2023","cd":"2024-06-14","lat":6.681266,"lon":124.609316,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7031},{"i":8883,"cid":"23IC0072","pid":"P00733755VS","t":"Construction of Flood Control Structure, Barangay Zone 2, Santa Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"CEY BUILDERS","c":5934012.79,"abc":5940000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-07-13","lat":11.184765,"lon":124.918064,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7032},{"i":8884,"cid":"24IA0056","pid":"P00820916VS","t":"Construction of Catmon Flood Control Structure along Biliran Circumferential Road, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":23980324.5,"abc":24484709.56,"fy":"2024","sd":"02/27/2024","cd":"2024-07-30","lat":11.525724,"lon":124.428175,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7033},{"i":8885,"cid":"22IC0076","pid":"P00633237VS","t":"Construction of Flood Control Structure Along Dungon River, Brgy. Villa Magsaysay, Babatngon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"BABATNGON (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LUG KONSTRACT, INC. (FORMERLY: LUG KONSTRACT)","c":19778276.71,"abc":19800000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-03-06","lat":11.352235,"lon":124.919312,"sm":87,"fm":87,"tm":87,"am":87,"md":0.0,"ls":"inside","ww":"Dungon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Villa Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7034},{"i":8886,"cid":"22K00345","pid":"P00620349MN","t":"Construction of Flood Control Structures at Tagoloan River (Natumolan Section), Package 7, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"TAGOLOAN (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":47284715.1,"abc":48250000.0,"fy":"2022","sd":"11/07/2022","cd":"2024-02-02","lat":8.538158,"lon":124.7691,"sm":1518,"fm":1518,"tm":null,"am":1518,"md":0.0,"ls":"inside","ww":"Tagoloan","wn":"Tagoloan River","wd":0.12,"wp":[8.53922,124.76935],"wst":"matched","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7035},{"i":8887,"cid":"24IL0009","pid":"P00820263VS","t":"Construction of Malbago Flood Control Segment 2, Bontoc, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"BONTOC (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-08","lat":10.382677,"lon":124.91953,"sm":226,"fm":226,"tm":226,"am":226,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Segment 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7036},{"i":8888,"cid":"23HB0070","pid":"P00733702VS","t":"Construction of Guinsularan River Control, Lobogon, Duero, Bohol, Sta. 0+000 - Sta. 0+750","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"JAMARI CONSTRUCTION (FORMERLY FRAE CONSTRUCTION) / ALTACS CONSTRUCTION","c":78999999.76,"abc":79200000.0,"fy":"2023","sd":"05/26/2023","cd":"2024-03-13","lat":9.73891,"lon":124.42933,"sm":532,"fm":532,"tm":532,"am":601,"md":0.05,"ls":"boundary","ww":"Guinsularan","wn":"Guinsularan River","wd":0.01,"wp":[9.73893,124.42928],"wst":"matched","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7037},{"i":8889,"cid":"23IC0030","pid":"P00721711VS","t":"Rehabilitation of Flood Control Structure along Bangon River, Palo, Leyte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":20194672.1,"abc":20413400.0,"fy":"2023","sd":"03/24/2023","cd":"2023-08-08","lat":11.16087,"lon":124.997122,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Bangon","wn":"Bangon River","wd":0.02,"wp":[11.16106,124.99717],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7038},{"i":8890,"cid":"23II0020","pid":"P00721719VS","t":"Construction of Flood Control Structure, Catubig River, Barangay Canuctan, Catubig, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATUBIG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"MIK AND MEL CONSTRUCTION AND SUPPLY","c":19402210.15,"abc":19599968.55,"fy":"2023","sd":"02/07/2023","cd":"2024-01-25","lat":12.402352,"lon":125.056551,"sm":357,"fm":357,"tm":357,"am":357,"md":0.0,"ls":"inside","ww":"Catubig","wn":"Catubig River","wd":12.75,"wp":[12.28874,125.03683],"wst":"matched","br":"Canuctan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7039},{"i":8891,"cid":"24M00111","pid":"P00833570MN","t":"Construction of Badtasan River Flood Control, Kiamba, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":98999858.7,"abc":99000000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-11-21","lat":6.00715,"lon":124.609471,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":"Badtasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7040},{"i":8892,"cid":"24KH0040","pid":"P00836179MN","t":"Construction of Drainage System, Brgy. Bulua, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"ABAYCER CONSTRUCTION SUPPLIES AND GENERAL MERCHANDISE","c":9900000.0,"abc":9900000.0,"fy":"2024","sd":"03/11/2024","cd":"2024-09-30","lat":8.503822,"lon":124.609583,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bulua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7041},{"i":8893,"cid":"22IK0039","pid":"P00620215VS","t":"Construction of Flood Control Protection Works Structure, Bangon Bridge, Basey - Dolongan Road, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":39197894.48,"abc":39199990.66,"fy":"2022","sd":"02/14/2022","cd":"2023-01-15","lat":11.288249,"lon":125.058421,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7042},{"i":8894,"cid":"23M00070","pid":"P00721470MN","t":"Construction of River Bank Protection along Ala River, Barangay Upper Maculan, Lake Sebu, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"LAKE SEBU (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"AMPLEX CONSTRUCTION AND SUPPLIES","c":57899993.65,"abc":57900000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-08-31","lat":6.242713,"lon":124.769435,"sm":738,"fm":738,"tm":738,"am":738,"md":0.0,"ls":"inside","ww":"Sebu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Upper Maculan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7043},{"i":8895,"cid":"23IC0034","pid":"P00721707VS","t":"Construction of Flood Control Structure along Maslog River, Brgy. Zone III, Sta. Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":48948975.79,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-10-09","lat":11.186051,"lon":124.919886,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":"Maslog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Zone III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7044},{"i":8896,"cid":"24IL0022","pid":"P00820261VS","t":"Construction of Caaga - San Jose Flood Control Structure, Malitbog, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"MALITBOG (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JDR CONSTRUCTION / JGO BUILDERS","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-25","lat":10.147315,"lon":124.997853,"sm":900,"fm":900,"tm":900,"am":900,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7045},{"i":8897,"cid":"22IF0003","pid":"P00620198VS","t":"Construction of Tabunok Flood Control, Isabel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ISABEL (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"CLMB CONSTRUCTION","c":19599997.66,"abc":19599962.94,"fy":"2022","sd":"02/21/2022","cd":"2022-07-20","lat":10.961367,"lon":124.431115,"sm":650,"fm":650,"tm":650,"am":1071,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7046},{"i":8898,"cid":"23IF0022","pid":"P00721717VS","t":"Construction of Anilao Flood Control, Ormoc City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ORMOC CITY (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":22089199.87,"abc":22540000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-07-25","lat":11.025071,"lon":124.609605,"sm":1043,"fm":1043,"tm":1043,"am":1043,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7047},{"i":8899,"cid":"22KL0044","pid":"P00630482MN","t":"Construction of Flood Control Structure at Tag-anga River (Downstream of Tag-anga Bridge), Villanueva, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"VILLANUEVA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":62725000.0,"abc":62725000.0,"fy":"2022","sd":"02/28/2022","cd":"2022-12-17","lat":8.578547,"lon":124.769914,"sm":1632,"fm":1632,"tm":1632,"am":1632,"md":0.0,"ls":"inside","ww":"Tag-anga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7048},{"i":8900,"cid":"24KB0037","pid":"P00820051MN","t":"Construction of Revetment, Downstream and Upstream of Colambugon Bridge (B01433MN) along Maramag-Maradugao Road, Maramag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC. / RRN CONSTRUCTION & DEV'T. CORP. (FORMERLY: RRN CONSTRUCTION)","c":57900000.0,"abc":57900000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-12-14","lat":7.795822,"lon":124.922272,"sm":932,"fm":932,"tm":932,"am":932,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7049},{"i":8901,"cid":"24HC0057","pid":"P00835002VS","t":"Construction of Ubay Flood Control Structure, Barangay Bongbong-Barangay San Pascual, Ubay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"UBAY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"ZLREJ TRADING AND CONSTRUCTION CORPORATION","c":39565619.24,"abc":39200000.0,"fy":"2024","sd":"05/09/2024","cd":"2025-04-15","lat":9.952012,"lon":124.431825,"sm":1612,"fm":1612,"tm":1612,"am":1612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bongbong-Barangay San Pascual","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.00933,"text":"Contract cost is 0.93% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":861},{"i":8902,"cid":"22ID0052","pid":"P00620184VS","t":"Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Sta. 0+106 - Sta. 0+677, Brgy. General Luna, Mayorga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MAYORGA (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":48307483.94,"abc":48999959.43,"fy":"2022","sd":"03/01/2022","cd":"2022-11-11","lat":10.88117,"lon":124.99837,"sm":962,"fm":962,"tm":962,"am":962,"md":0.0,"ls":"inside","ww":"Hibuga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"General Luna","len":571.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7050},{"i":8903,"cid":"21MF0056","pid":"P00522264MN","t":"Construction of Flood Control Structure, Sitio Taga, Barangay Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Lambayong","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY)","c":45686809.57,"abc":45711313.38,"fy":"2021","sd":"11/23/2021","cd":"2022-12-09","lat":6.837672,"lon":124.610808,"sm":742,"fm":null,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[],"run":[8945,8781],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0056 to 21MF0058) cover the same site, together worth PHP 135,979,509.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":604},{"i":8904,"cid":"23KK0075","pid":"P00721549MN","t":"Construction of Flood Control/Revetment, Brgy. Lunao, Gingoog City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"DICON BUILDERS CORP.","c":67550000.0,"abc":67550000.0,"fy":"2023","sd":"05/08/2023","cd":"2024-02-10","lat":8.8532,"lon":125.0585,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lunao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7051},{"i":8905,"cid":"22IC0072","pid":"P00632037VS","t":"Construction of Flood Control along Lingayon River, Brgy. Gapaz, Sta. Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JJ PALACIO CONSTRUCTION","c":49400027.77,"abc":49500000.0,"fy":"2022","sd":"05/20/2022","cd":"2022-10-10","lat":11.209775,"lon":124.923252,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":"Lingayon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gapaz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7052},{"i":8906,"cid":"23IC0032","pid":"P00721705VS","t":"Construction of Flood Control Structure, Brgy. San Vicente, Tolosa, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TOLOSA (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"COLLERA CONSTRUCTION","c":48491990.63,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-07-21","lat":11.040482,"lon":124.998711,"sm":1578,"fm":1578,"tm":1578,"am":1578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Vicente","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7053},{"i":8907,"cid":"24IA0011","pid":"P00832668VS","t":"Construction of Seawall, Barangay Villa Cornejo, Kawayan, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"KAWAYAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"M.B. ANG CONSTRUCTION & SUPPLY","c":4845187.5,"abc":4946592.67,"fy":"2024","sd":"02/11/2024","cd":"2024-04-25","lat":11.70296,"lon":124.432261,"sm":704,"fm":704,"tm":704,"am":704,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Villa Cornejo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7054},{"i":8908,"cid":"22MF0015","pid":"P00620289MN","t":"Construction of Flood Control Structure, Ala River (Taga Section), Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / GIBUILD DEVELOPMENT CORP.","c":48879220.9,"abc":48979223.92,"fy":"2022","sd":"05/25/2022","cd":"2023-06-15","lat":6.854047,"lon":124.611647,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":"Ala","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[8919],"run":[8524,8454,8577,8639,8706,8760],"cl":[],"L":"field","s":49,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 85,010,129.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (22MF0010 to 22MF0016) cover the same site, together worth PHP 341,011,121.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":110},{"i":8909,"cid":"23M00019","pid":"P00721454MN","t":"Construction of Malasila River Flood Control, Sta. 39 + 600 - Sta. 40 + 770, Sta. 40 + 170 - Sta. 40 + 770, Barangay Bulacanon, Makilala, North Cotabato, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":72374996.63,"abc":72375000.0,"fy":"2023","sd":"08/31/2023","cd":"2024-04-28","lat":6.937552,"lon":125.060628,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.01,"wp":[6.93742,125.06063],"wst":"matched","br":"Bulacanon","len":1770.0,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7055},{"i":8910,"cid":"24IL0023","pid":"P00820259VS","t":"Construction of Beniton Flood Control Segment 2, Bontoc, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"BONTOC (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"FAIRCHILD BUILDERS & DEVELOPERS, INC.","c":48934168.88,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-10-09","lat":10.373349,"lon":124.92449,"sm":226,"fm":226,"tm":226,"am":226,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Segment 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7056},{"i":8911,"cid":"23IM0029","pid":"P00731697VS","t":"Construction of Drainage System along Athletic Road, Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"G.O.C. BUILDERS","c":8920501.93,"abc":9013094.2,"fy":"2023","sd":"02/23/2023","cd":"2023-04-12","lat":11.237487,"lon":125.000511,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7057},{"i":8912,"cid":"23HB0087","pid":"P00733735VS","t":"Construction of Box Culvert at Tagbilaran East Road (including Box Culvert and Drainage), K0184+200, Brgy. Guinsularan, Duero, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"DUERO (BOHOL)","deo":"Bohol 3rd District Engineering Office","co":"E.R. VENZON CONSTRUCTION","c":49434062.86,"abc":49500000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-01-30","lat":9.72311,"lon":124.43311,"sm":532,"fm":532,"tm":532,"am":532,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guinsularan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7058},{"i":8913,"cid":"22MI0084","pid":"P00632612MN","t":"Construction of 3 Box Culvert in Barangay Pinamulaan, Banisilan, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"BANISILAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"SAREX BUILDERS AND SUPPLY","c":4898265.99,"abc":4950000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-08-06","lat":7.516667,"lon":124.771389,"sm":153,"fm":153,"tm":153,"am":153,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinamulaan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7059},{"i":8914,"cid":"23KK0103","pid":"P00733986MN","t":"Construction of Revetment at Binitinan Bridge (Abutment A & B), Balingasag, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"BALINGASAG (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/23/2023","cd":"2024-03-08","lat":8.711928,"lon":124.771807,"sm":134,"fm":134,"tm":134,"am":134,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7060},{"i":8915,"cid":"24IF0029","pid":"P00820245VS","t":"Construction of Spillway, Barangay Tambis, Palompon, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALOMPON (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LIMAR CONSTRUCTION","c":5821084.15,"abc":5880000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-06-11","lat":11.0425,"lon":124.433611,"sm":1071,"fm":1071,"tm":1071,"am":1071,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7061},{"i":8916,"cid":"24KK0058","pid":"P00835778MN","t":"Construction of River Dike at Lunao Bridge (Abutment A and B), Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/06/2024","cd":"2025-04-28","lat":8.852241,"lon":125.063665,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7062},{"i":8917,"cid":"22IG0037","pid":"P00620281VS","t":"Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin, Right Side Bank, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY) / EZJONES CONSTRUCTION INC.","c":95536997.78,"abc":96500000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-11-16","lat":10.727372,"lon":125.001298,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.08,"wp":[10.72748,125.00202],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7063},{"i":8918,"cid":"22KB0073","pid":"P00630499MN","t":"Construction of Revetment, Downstream and Upstream of San Miguel Bridge (B01432MN) along Maramag-Maradugao Road, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"MARAMAG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-19","lat":7.791711,"lon":124.925553,"sm":932,"fm":932,"tm":null,"am":932,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7064},{"i":8919,"cid":"22MF0030","pid":"P00630631MN","t":"Construction of Flood Control Structure, Sitio Taga, Brgy. Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / GIBUILD DEVELOPMENT CORP.","c":36130907.87,"abc":36230988.82,"fy":"2022","sd":"05/25/2022","cd":"2023-06-15","lat":6.854047,"lon":124.611647,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[8908],"run":[8752,8925],"cl":[],"L":"field","s":46,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 85,010,129.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22MF0028 to 22MF0030) cover the same site, together worth PHP 109,919,887.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":137},{"i":8920,"cid":"24IG0028","pid":"P00820362VS","t":"Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin, Right Side Bank, Abuyog, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ABUYOG (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) / JGO BUILDERS","c":96499959.2,"abc":96500000.0,"fy":"2024","sd":"03/18/2024","cd":"2024-12-12","lat":10.732158,"lon":125.00149,"sm":4,"fm":4,"tm":4,"am":4,"md":0.0,"ls":"inside","ww":"Cadac-an","wn":"Cadacan River","wd":0.11,"wp":[10.73173,125.00245],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7065},{"i":8921,"cid":"22K00119","pid":"P00620033MN","t":"Construction of Flood Control Structure, Barangay Lunao, Phase 2, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":74496866.33,"abc":77200000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-07-30","lat":8.852257,"lon":125.063941,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lunao","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7066},{"i":8922,"cid":"23IC0041","pid":"P00721856VS","t":"Construction of Flood Control Structure along Binahaan River, Brgy. Cogon, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"MWJ CONSTRUCTION","c":48950000.0,"abc":49000000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-22","lat":11.143005,"lon":125.001734,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.14295,125.00202],"wst":"matched","br":"Cogon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7067},{"i":8923,"cid":"22IE0070","pid":"P00632043VS","t":"Construction of Flood Control, Barangay Cabalquinto, Calubian Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CALUBIAN (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"KAUIE BUILDERS & SUPPLIES INC. (FORMERLY: KAUIE BUILDERS AND CONSTRUCTION SUPPLIES)","c":4798557.51,"abc":4899994.35,"fy":"2022","sd":"03/25/2022","cd":"2022-07-27","lat":11.43268,"lon":124.43552,"sm":309,"fm":309,"tm":null,"am":309,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabalquinto","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7068},{"i":8924,"cid":"22MI0091","pid":"P00620281MN","t":"Construction of Revetment, Marbel River Bank Protection (Upstream of Marbel Bridge), Matalam, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MATALAM (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY / ALZEN ENGINEERING & CONSTRUCTION SUPPLIES","c":48252314.01,"abc":48250000.0,"fy":"2022","sd":"05/20/2022","cd":"2023-05-12","lat":7.119498,"lon":124.927072,"sm":951,"fm":951,"tm":951,"am":951,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.01,"wp":[7.11947,124.927],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7069},{"i":8925,"cid":"22MF0029","pid":"P00630630MN","t":"Construction of Flood Control Structure, Sitio Panabungan, Brgy. Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT)","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / GIBUILD DEVELOPMENT CORP.","c":35887489.97,"abc":36249922.23,"fy":"2022","sd":"04/11/2022","cd":"2023-05-31","lat":6.851825,"lon":124.612522,"sm":742,"fm":742,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[],"run":[8752,8919],"cl":[],"L":"field","s":32,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (22MF0028 to 22MF0030) cover the same site, together worth PHP 109,919,887.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":629},{"i":8926,"cid":"22KL0045","pid":"P00630483MN","t":"Construction of Flood Control Structure at Tag-anga River (Upstream of Tag-anga Bridge), Villanueva, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"VILLANUEVA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":62725000.0,"abc":62725000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-12-20","lat":8.576628,"lon":124.771967,"sm":1632,"fm":1632,"tm":1632,"am":1632,"md":0.0,"ls":"inside","ww":"Tag-anga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7070},{"i":8927,"cid":"22IK0025","pid":"P00620214VS","t":"Construction of Flood Control Mitigation Protection Works, along Hinabangan River, Hinabangan, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"HINABANGAN (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":29399393.89,"abc":29399999.71,"fy":"2022","sd":"02/14/2022","cd":"2022-10-04","lat":11.703228,"lon":125.065353,"sm":618,"fm":618,"tm":618,"am":618,"md":0.0,"ls":"inside","ww":"Hinabangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7071},{"i":8928,"cid":"22IE0069","pid":"P00632041VS","t":"Construction of Flood Control, Barangay Herera, Calubian Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"CALUBIAN (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"LUG KONSTRACT, INC. (FORMERLY: LUG KONSTRACT)","c":4851201.35,"abc":4899993.6,"fy":"2022","sd":"03/25/2022","cd":"2022-07-26","lat":11.43075,"lon":124.43566,"sm":309,"fm":309,"tm":null,"am":309,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Herera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7072},{"i":8929,"cid":"23IM0082","pid":"P00731693VS","t":"Construction of Drainage System along Senator Enage St. and Jones St., Tacloban City, Leyte","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"G.O.C. BUILDERS","c":10672104.06,"abc":10777945.99,"fy":"2023","sd":"06/16/2023","cd":"2023-11-02","lat":11.247684,"lon":125.001926,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7073},{"i":8930,"cid":"24KH0026","pid":"P00820897MN","t":"Construction of Flood Mitigation Structure Along Cagayan de Oro River (Cabula Downstream Section 2), Cagayan de Oro City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":72375000.0,"abc":72375000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-12-27","lat":8.388764,"lon":124.612797,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.06,"wp":[8.38867,124.61335],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7074},{"i":8931,"cid":"22ID0053","pid":"P00620332VS","t":"Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+000 - Sta. 0+500, Brgy. Digahungan, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":48999996.54,"abc":48999999.72,"fy":"2022","sd":"03/21/2022","cd":"2023-03-30","lat":11.068578,"lon":124.929266,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.09,"wp":[11.06894,124.92854],"wst":"matched","br":"Digahungan","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7075},{"i":8932,"cid":"21KL0056","pid":"P00522059MN","t":"Construction of Flood Control Structure along BCIR, Upstream of Villanueva Bridge, Villanueva, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Villanueva","deo":"Misamis Oriental 2nd District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":80672953.52,"abc":96500000.0,"fy":"2021","sd":"04/01/2022","cd":"2022-12-13","lat":8.590244,"lon":124.773882,"sm":1632,"fm":null,"tm":1632,"am":1632,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7076},{"i":8933,"cid":"22IJ0031","pid":"P00630238VS","t":"Construction of Flood Control Structure along Kinawan River (Upstream), Brgy. San Joaquin, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48698693.64,"abc":49000000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-19","lat":12.164167,"lon":124.444167,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Kinawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7077},{"i":8934,"cid":"24IC0066","pid":"P00820371VS","t":"Construction of Flood Control along Binahaan River, Barangay Guingauan, Tanauan, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TANAUAN (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) / AICON INDUSTRIES","c":96427104.08,"abc":96500000.0,"fy":"2024","sd":"02/15/2024","cd":"2024-10-10","lat":11.146346,"lon":125.001994,"sm":1540,"fm":1540,"tm":1540,"am":1070,"md":1.65,"ls":"adjacent","ww":"Binahaan","wn":"Binahaan River","wd":0.04,"wp":[11.14608,125.00219],"wst":"matched","br":"Guingauan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7078},{"i":8935,"cid":"24KH0037","pid":"P00835771MN","t":"Construction of Flood Mitigation Structure Along Cagayan de Oro River (Cabula Upstream Section 1), Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-12-27","lat":8.388469,"lon":124.612819,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.05,"wp":[8.38838,124.6133],"wst":"matched","br":null,"len":null,"ph":"Section 1","dup":[8940],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 168,875,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":699},{"i":8936,"cid":"24MG0009","pid":"P00820205MN","t":"Construction of Buenavista CIS Protection Works, Surallah, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"SURALLAH (SOUTH COTABATO)","deo":"South Cotabato 2nd District Engineering Office","co":"SOUTHCAST CONSTRUCTION","c":15670474.94,"abc":15680000.0,"fy":"2024","sd":"01/30/2024","cd":"2024-06-16","lat":6.29851,"lon":124.77394,"sm":1496,"fm":1496,"tm":1496,"am":1496,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7079},{"i":8937,"cid":"22K00122","pid":"P00620034MN","t":"Construction of Flood Control Structure, Brgy. Lunao, Sta. 0+620.00 - Sta. 1+116.00, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"MINDANAO ROCK / LT POWER BUILDERS DEVELOPMENT CORPORATION","c":92833000.0,"abc":96500000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-04-24","lat":8.849559,"lon":125.065789,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lunao","len":496.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7080},{"i":8938,"cid":"23IC0039","pid":"P00721854VS","t":"Construction of Flood Control Structure along Binahaan River, Brgy. San Joaquin, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP. / R. YAO CONSTRUCTION","c":48939239.49,"abc":49000000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-07-03","lat":11.142351,"lon":125.002103,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.14239,125.00191],"wst":"matched","br":"San Joaquin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7081},{"i":8939,"cid":"23IA0061","pid":"P00733750VS","t":"Construction of Flood Control Phase III, Brgy . Anislagan, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":4821663.8,"abc":4945295.62,"fy":"2023","sd":"03/30/2023","cd":"2023-05-31","lat":11.52999,"lon":124.446246,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anislagan","len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7082},{"i":8940,"cid":"24KH0038","pid":"P00835772MN","t":"Construction of Flood Mitigation Structure Along Cagayan de Oro River (Cabula Upstream Section 2), Cagayan de Oro City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL)","deo":"Cagayan de Oro City 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":72375000.0,"abc":72375000.0,"fy":"2024","sd":"02/28/2024","cd":"2024-12-20","lat":8.388469,"lon":124.612819,"sm":284,"fm":284,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Cagayan de Oro","wn":"Cagayan de Oro River","wd":0.05,"wp":[8.38838,124.6133],"wst":"matched","br":null,"len":null,"ph":"Section 2","dup":[8935],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 168,875,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":862},{"i":8941,"cid":"22MI0099","pid":"P00620099MN","t":"Construction of Marbel River Bank Protection (Sta. 4+941 - Sta.5+441, Left Bank), Matalam, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MATALAM (COTABATO (NORTH COTABATO))","deo":"Cotabato 3rd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":51590891.41,"abc":52110000.0,"fy":"2022","sd":"09/12/2022","cd":"2023-09-08","lat":7.121872,"lon":124.929594,"sm":951,"fm":951,"tm":951,"am":951,"md":0.0,"ls":"inside","ww":"Marbel","wn":"Marbel River","wd":0.05,"wp":[7.1214,124.92962],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7083},{"i":8942,"cid":"22KL0048","pid":"P00630490MN","t":"Construction of Flood Control Structure, Villanueva, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"VILLANUEVA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 2nd District Engineering Office","co":"CAGALAWAN ENTERPRISES / FFJJ CONSTRUCTION","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/03/2022","cd":"2022-12-13","lat":8.590167,"lon":124.773961,"sm":1632,"fm":1632,"tm":1632,"am":1632,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7084},{"i":8943,"cid":"22IL0074","pid":"P00620229VS","t":"Construction of Kawayan Flood Control, Libagon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"LIBAGON (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":25003720.0,"abc":25003720.0,"fy":"2022","sd":"02/16/2022","cd":"2023-05-02","lat":10.278093,"lon":125.066348,"sm":777,"fm":777,"tm":777,"am":777,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7085},{"i":8944,"cid":"22IC0021","pid":"P00620328VS","t":"Construction/Maintenance of Flood Mitigation Structure and Drainage Systems, Construction of Flood Control Along Binahaan River, Sta. 2+800 to Sta. 3+143, Brgy. San Joaquin, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48020000.0,"abc":48020000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-25","lat":11.145383,"lon":125.002126,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.14541,125.00193],"wst":"matched","br":"San Joaquin","len":343.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7086},{"i":8945,"cid":"21MF0057","pid":"P00522265MN","t":"Construction of Flood Control Structure, Sitio Panabungan, Barangay Tinumigues, Lambayong, Sultan Kudarat","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SULTAN KUDARAT","mu":"Lambayong","deo":"Sultan Kudarat 1st District Engineering Office","co":"CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) / GIBUILD DEVELOPMENT CORP.","c":45049458.57,"abc":45709473.62,"fy":"2021","sd":"11/23/2021","cd":"2022-07-26","lat":6.849364,"lon":124.613261,"sm":742,"fm":null,"tm":742,"am":742,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinumigues","len":null,"ph":null,"dup":[],"run":[8903,8781],"cl":[],"L":"field","s":33,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21MF0056 to 21MF0058) cover the same site, together worth PHP 135,979,509.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":605},{"i":8946,"cid":"23IA0023","pid":"P00732041VS","t":"Construction of Flood Control Structure, Barangay Anislagan, Naval, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":4790143.2,"abc":4945940.3,"fy":"2023","sd":"02/20/2023","cd":"2023-05-05","lat":11.529818,"lon":124.446447,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anislagan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7087},{"i":8947,"cid":"23IG0008","pid":"P00721580VS","t":"Construction of Bangkerohan Flood Control Structure, Barangay Cantandug, Hilongos, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"HILONGOS (LEYTE)","deo":"Leyte 5th District Engineering Office","co":"RJIR ENTERPRISES CORPORATION","c":52329124.56,"abc":53075000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-09-04","lat":10.349177,"lon":124.774891,"sm":617,"fm":617,"tm":617,"am":617,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cantandug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7088},{"i":8948,"cid":"24I00018","pid":"P00832223VS","t":"Construction of Flood Control Structure along Mahayahay Creek, Tacloban City, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"EZJONES CONSTRUCTION INC. / JB KONSTRUKTURA COMPANY","c":164049999.4,"abc":164050625.8,"fy":"2024","sd":"03/06/2024","cd":"2024-11-25","lat":11.206471,"lon":125.002586,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":"Mahayahay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7089},{"i":8949,"cid":"23IC0111","pid":"P00721964VS","t":"Construction/Rehabilitation of Flood Control Mitigation Facilities along San Isidro River Upstream, Brgy., San Isidro, Sta. Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"RT BUILDERS","c":47988909.99,"abc":48020000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-11-14","lat":11.204906,"lon":124.929805,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7090},{"i":8950,"cid":"22IH0092","pid":"P00630682VS","t":"Construction of Drainage Canal, Barangay Daganas, Catarman, Northern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"CATARMAN (CAPITAL) (NORTHERN SAMAR)","deo":"Northern Samar 1st District Engineering Office","co":"C. A. CONSTRUCTION AND SUPPLY","c":4900810.34,"abc":4949667.32,"fy":"2022","sd":"02/21/2022","cd":"2022-07-21","lat":12.50764,"lon":124.613454,"sm":352,"fm":352,"tm":352,"am":352,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daganas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7091},{"i":8951,"cid":"19I00115","pid":"P00320211VS","t":"Construction of Basey Tide Embankment, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"Basey","deo":"Samar 2nd District Engineering Office","co":"NORTHERN BUILDERS / RIANNE CONSTRUCTION","c":227812286.4,"abc":233876034.9,"fy":"2019","sd":"08/14/2019","cd":"2023-08-08","lat":11.27882,"lon":125.066788,"sm":174,"fm":null,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7092},{"i":8952,"cid":"22HC0040","pid":"P00630213VS","t":"Construction of Capayas Flood Control, Ubay, Bohol","w":"Construction of Flood Mitigation Structure","rg":"Region VII","pv":"BOHOL","mu":"UBAY (BOHOL)","deo":"Bohol 2nd District Engineering Office","co":"JA ACHACOSO ENTERPRISES & GENERAL SERVICES","c":33272696.0,"abc":34300000.0,"fy":"2022","sd":"03/16/2022","cd":"2023-03-26","lat":10.002464,"lon":124.446543,"sm":1612,"fm":1612,"tm":1612,"am":1612,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7093},{"i":8953,"cid":"22I00087","pid":"P00620421VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 3 and 4, Brgy. San Joaquin, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION","c":33674274.99,"abc":33774296.22,"fy":"2022","sd":"06/13/2022","cd":"2022-12-29","lat":11.145304,"lon":125.002789,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Joaquin","len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7094},{"i":8954,"cid":"24II0075","pid":"P00835031VS","t":"Construction of Drainage System along Municipal Streets, Pambujan, Northern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PAMBUJAN (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"J SQUARE BUILDERS AND CONSTRUCTION SUPPLY","c":9883728.36,"abc":9899959.65,"fy":"2024","sd":"06/07/2024","cd":"2025-01-31","lat":12.562792,"lon":124.930103,"sm":1073,"fm":1073,"tm":1073,"am":1073,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7095},{"i":8955,"cid":"19I00115","pid":"P00320211VS","t":"Construction of Basey Tide Embankment, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"Basey","deo":"Samar 2nd District Engineering Office","co":"NORTHERN BUILDERS / RIANNE CONSTRUCTION","c":227812286.4,"abc":233876034.9,"fy":"2020","sd":"08/14/2019","cd":"2023-08-08","lat":11.27882,"lon":125.066788,"sm":174,"fm":null,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7096},{"i":8956,"cid":"23IM0058","pid":"P00721917VS","t":"Construction of Shore Protection, Magsaysay Boulevard, Phase 3, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / TWENTYSIX CONSTRUCTION INC.","c":55021203.86,"abc":55466554.48,"fy":"2023","sd":"03/23/2023","cd":"2023-12-19","lat":11.252422,"lon":125.002803,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7097},{"i":8957,"cid":"24IA0048","pid":"P00832665VS","t":"Construction of Flood Control Structure, Phase IV, Barangay Anislagan, Naval, Biliran","w":"Construction of Revetment","rg":"Region VIII","pv":"BILIRAN","mu":"NAVAL (CAPITAL) (BILIRAN)","deo":"Biliran District Engineering Office","co":"RMA BUILDERS & SUPPLIES CORPORATION","c":4886183.75,"abc":4945530.11,"fy":"2024","sd":"02/18/2024","cd":"2024-03-15","lat":11.530549,"lon":124.446548,"sm":1018,"fm":1018,"tm":1018,"am":1018,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anislagan","len":null,"ph":"Phase IV","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7098},{"i":8958,"cid":"22KB0076","pid":"P00630573MN","t":"Construction of Revetment, Downstream and Upstream of Damulog Bridge along Damulog Creek, Barangay Pocopoco, Damulog, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"DAMULOG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"02/15/2022","cd":"2022-12-11","lat":7.47631,"lon":124.932571,"sm":477,"fm":477,"tm":477,"am":477,"md":0.0,"ls":"inside","ww":"Damulog","wn":"Damulog River","wd":0.03,"wp":[7.4761,124.93269],"wst":"matched","br":"Pocopoco","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7099},{"i":8959,"cid":"21K00242","pid":"P00522056MN","t":"Construction of Drainage Channel from BCIR to Iponan River, Package 6, Bulua, Cagayan de Oro City","w":"Construction of Drainage Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"Cagayan de Oro City","deo":"Cagayan de Oro City 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":96179476.23,"abc":101325000.0,"fy":"2021","sd":"11/22/2021","cd":"2024-04-30","lat":8.519963,"lon":124.613667,"sm":284,"fm":null,"tm":284,"am":284,"md":0.0,"ls":"inside","ww":"Iponan","wn":"Iponan River","wd":0.06,"wp":[8.51998,124.61311],"wst":"matched","br":null,"len":null,"ph":"Package 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7100},{"i":8960,"cid":"19I00115","pid":"P00320211VS","t":"Construction of Basey Tide Embankment, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"Basey","deo":"Samar 2nd District Engineering Office","co":"NORTHERN BUILDERS / RIANNE CONSTRUCTION","c":227812286.4,"abc":233876034.9,"fy":"2021","sd":"08/14/2019","cd":"2023-08-08","lat":11.27882,"lon":125.066788,"sm":174,"fm":null,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7101},{"i":8961,"cid":"22IM0018","pid":"P00620236VS","t":"Construction of Shore Protection, Old Road Sagkahan, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":48013198.2,"abc":48991358.55,"fy":"2022","sd":"02/17/2022","cd":"2023-01-20","lat":11.223451,"lon":125.004464,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7102},{"i":8962,"cid":"22IA0024","pid":"P00620172VS","t":"Rehabilitation of Busali Flood Control along Biliran Circumferential Road, Biliran","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"YOYEN ENTERPRISES","c":28108432.3,"abc":29371402.63,"fy":"2022","sd":"02/21/2022","cd":"2022-08-19","lat":11.490833,"lon":124.4475,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7103},{"i":8963,"cid":"24IF0023","pid":"P00820907VS","t":"Construction of Sitio Matin-aw Flood Control Structure (Upstream), Barangay Rizal, Kananga, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"KANANGA (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"LEDA  CONSTRUCTION INCORPORATED","c":96373321.44,"abc":96500000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-11-25","lat":11.190785,"lon":124.614341,"sm":695,"fm":695,"tm":695,"am":695,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7104},{"i":8964,"cid":"22KB0075","pid":"P00620117MN","t":"Construction of Revetment, Downstream and Upstream of Damulog Bridge along Damulog Creek, Damulag, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"DAMULOG (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":23520000.0,"abc":23520000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":7.475259,"lon":124.933073,"sm":477,"fm":477,"tm":null,"am":477,"md":0.0,"ls":"inside","ww":"Damulog","wn":"Damulog River","wd":0.03,"wp":[7.47526,124.93332],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7105},{"i":8965,"cid":"22IJ0043","pid":"P00630240VS","t":"Construction of Flood Control Structures along Tabawan Creek (Phase II), Brgy. Tabawan, Calbayog City, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"CALBAYOG CITY (SAMAR (WESTERN SAMAR))","deo":"Samar 1st District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48637574.32,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-10-28","lat":12.102333,"lon":124.617508,"sm":304,"fm":304,"tm":304,"am":304,"md":0.0,"ls":"inside","ww":"Tabawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tabawan","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7106},{"i":8966,"cid":"23IM0040","pid":"P00733329VS","t":"Construction of Shore Protection, Old Road Sagkahan (Astrodome Area), Phase 2, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)","c":48603557.57,"abc":48990558.22,"fy":"2023","sd":"04/05/2023","cd":"2024-01-28","lat":11.223469,"lon":125.004516,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7107},{"i":8967,"cid":"22IA0036","pid":"P00620165VS","t":"Construction of Moog Flood Control along Biliran Circumferential Road, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION)","c":19588846.94,"abc":19588764.68,"fy":"2022","sd":"03/17/2022","cd":"2022-10-11","lat":11.487753,"lon":124.448127,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7108},{"i":8968,"cid":"23IC0033","pid":"P00721706VS","t":"Construction of Flood Control Structure along San Isidro Bridge, Brgy. San Isidro, Sta. Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION) / MILES CONSTRUCTION AND ENTERPRISES","c":48965004.89,"abc":49000000.0,"fy":"2023","sd":"03/22/2023","cd":"2023-09-19","lat":11.208095,"lon":124.936957,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7109},{"i":8969,"cid":"22MC0016","pid":"P00620278MN","t":"Construction of Revetment along Kabacan River (Alegria Section) Brgy. Alegria, President Roxas, North Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48999217.01,"abc":48999217.09,"fy":"2022","sd":"03/24/2022","cd":"2023-01-23","lat":7.132771,"lon":125.068918,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.02,"wp":[7.13298,125.06891],"wst":"matched","br":"Alegria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7110},{"i":8970,"cid":"23M00049","pid":"P00721305MN","t":"Construction of Tamadang River Control, Package B, Kiamba, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"KIAMBA (SARANGANI)","deo":"Sarangani District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":104667981.5,"abc":115800000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-11-26","lat":5.991944,"lon":124.62,"sm":707,"fm":707,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":"Tamadang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":397},{"i":8971,"cid":"22MC0018","pid":"P00620275MN","t":"Construction of Flood Control Dike along Kabacan River (Tuael Section) L/S, Brgy. Tuael, President Roxas, North Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JTL KONSTRUCT CORPORATION / VICENTE T. LAO CONSTRUCTION","c":48510000.0,"abc":48507232.68,"fy":"2022","sd":"03/18/2022","cd":"2023-01-12","lat":7.133508,"lon":125.069345,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.06,"wp":[7.13301,125.06938],"wst":"matched","br":"Tuael","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7111},{"i":8972,"cid":"23IE0056","pid":"P00733314VS","t":"Construction of mitigating measures (slope protection and line canal) of the visible damages cause by Typhoon Agaton within the Project Site, Villa Verde, Brgy Iligay, Villaba, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"VILLABA (LEYTE)","deo":"Leyte 3rd District Engineering Office","co":"RED AXE BUILDERS & SUPPLY","c":14552997.72,"abc":14699998.22,"fy":"2023","sd":"05/04/2023","cd":"2023-09-11","lat":11.25329,"lon":124.44818,"sm":1631,"fm":1631,"tm":1631,"am":1631,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iligay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7112},{"i":8973,"cid":"22I00008","pid":"P00620051VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 1, Brgy. Cogon, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"820 BUILDERS AND SUPPLIES","c":12920671.72,"abc":13290600.96,"fy":"2022","sd":"03/07/2022","cd":"2022-09-27","lat":11.153895,"lon":125.004911,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cogon","len":null,"ph":"Section 5","dup":[8976],"run":[],"cl":[],"L":"field","s":21,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 37,044,769.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1041},{"i":8974,"cid":"22ID0032","pid":"P00620334VS","t":"Construction of Ibawon Flood Control Structure and Drainage System, Ibawon River Basin, Sta. 0+000 - Sta. 0+400 (Upstream), Brgy. Burabod, MacArthur, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"MACARTHUR (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":48992529.6,"abc":48999999.4,"fy":"2022","sd":"03/21/2022","cd":"2022-12-10","lat":10.840641,"lon":124.937023,"sm":850,"fm":850,"tm":850,"am":722,"md":0.03,"ls":"boundary","ww":"Ibawon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Burabod","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7113},{"i":8975,"cid":"23M00171","pid":"P00721584MN","t":"Construction of Poblacion River Control, Kiamba, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":101285746.9,"abc":101325000.0,"fy":"2023","sd":"08/29/2023","cd":"2024-03-12","lat":5.98915,"lon":124.620114,"sm":707,"fm":890,"tm":707,"am":707,"md":0.0,"ls":"inside","ww":"Poblacion","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":29,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":71.7,"text":"The record contradicts itself: the title and the pin point to Kiamba, Sarangani, but the municipality field names Malapatan, Sarangani, 72 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":444},{"i":8976,"cid":"22I00021","pid":"P00620052VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Section 5, Phase 2, Brgy. Cogon, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"820 BUILDERS AND SUPPLIES","c":24124097.61,"abc":24099590.73,"fy":"2022","sd":"03/07/2022","cd":"2022-11-28","lat":11.153895,"lon":125.004911,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cogon","len":null,"ph":"Section 5","dup":[8973],"run":[],"cl":[],"L":"field","s":22,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 37,044,769.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1007},{"i":8977,"cid":"23IA0018","pid":"P00721699VS","t":"Construction of Busali Flood Control along Biliran Circumferential Road, Phase VI, Biliran, Biliran","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"BILIRAN","mu":"BILIRAN (BILIRAN)","deo":"Biliran District Engineering Office","co":"SUNRISE BUILDERS","c":19581741.14,"abc":19581445.65,"fy":"2023","sd":"02/20/2023","cd":"2023-10-31","lat":11.495401,"lon":124.45373,"sm":203,"fm":203,"tm":203,"am":203,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase VI","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7114},{"i":8978,"cid":"23KB0065","pid":"P00734019MN","t":"Construction of Revetment along Muleta River, Downstream and Upstream of Bridge along Jct DCK-Maraymaray, Don Carlos, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"DON CARLOS (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2023","sd":"06/12/2023","cd":"2024-02-06","lat":7.695397,"lon":124.937908,"sm":526,"fm":526,"tm":526,"am":526,"md":0.0,"ls":"inside","ww":"Muleta","wn":"Muleta River","wd":0.0,"wp":[7.6954,124.93793],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7115},{"i":8979,"cid":"24MD0035","pid":"P00820184MN","t":"Construction of Flood Control Structure along Balogo River (Anick Section), Barangay Anick, Pigkawayan, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PIGCAWAYAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"02/07/2024","cd":"2024-11-04","lat":7.305821,"lon":124.455153,"sm":1127,"fm":1127,"tm":1127,"am":1127,"md":0.0,"ls":"inside","ww":"Balogo","wn":"Balogo River","wd":0.01,"wp":[7.30573,124.45521],"wst":"matched","br":"Anick","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7116},{"i":8980,"cid":"24KB0122","pid":"P00836177MN","t":"Construction of Box Culvert, Barangay San Roque, Quezon, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"REVILO CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-08-05","lat":7.736053,"lon":125.071028,"sm":1189,"fm":1189,"tm":1189,"am":1189,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Roque","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7117},{"i":8981,"cid":"23IL0014","pid":"P00721607VS","t":"Construction of Shoreline Protection Structure - Bdry. So. Leyte - Maasin - Macrohon - Sogod - Jct. Daang Maharlika Rd. - along Macrohon Section, Macrohon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"MACROHON (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":84354739.01,"abc":84437500.0,"fy":"2023","sd":"02/21/2023","cd":"2024-03-30","lat":10.080119,"lon":124.938164,"sm":853,"fm":853,"tm":853,"am":853,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7118},{"i":8982,"cid":"23IM0048","pid":"P00733293VS","t":"Construction of Shore Protection, Old Road, Phase 2, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"LANOY CONSTRUCTION","c":96280895.96,"abc":96480563.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-22","lat":11.234229,"lon":125.005195,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7119},{"i":8983,"cid":"23MB0008","pid":"P00721313MN","t":"Construction of Concrete Revetment, (upstream of South Polomolok Bridge), Polomolok, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"POLOMOLOK (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC.","c":42634628.85,"abc":49697500.0,"fy":"2023","sd":"04/18/2023","cd":"2023-10-08","lat":6.20687,"lon":125.072579,"sm":1159,"fm":1159,"tm":1159,"am":1159,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7120},{"i":8984,"cid":"22ID0038","pid":"P00620333VS","t":"Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+160 - Sta. 0+460 (Upstream), Brgy. Balilit, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":48991275.51,"abc":48999980.64,"fy":"2022","sd":"03/21/2022","cd":"2023-03-03","lat":11.07803,"lon":124.939271,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.07823,124.93934],"wst":"matched","br":"Balilit","len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7121},{"i":8985,"cid":"24MC0029","pid":"P00820112MN","t":"Rehabilitation of Kabacan River Flood Control Structure, Alegria and Tuael, Pres. Roxas, North Cotabato","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"PRESIDENT ROXAS (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":67016235.0,"abc":67016235.0,"fy":"2024","sd":"03/21/2024","cd":"2024-12-16","lat":7.131793,"lon":125.075952,"sm":1174,"fm":1174,"tm":1174,"am":1174,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.13218,125.07607],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7122},{"i":8986,"cid":"23IM0117","pid":"P00733330VS","t":"Construction of Shore Protection, Magsaysay Boulevard Phase 2, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)","c":48901822.33,"abc":48982523.22,"fy":"2023","sd":"11/06/2023","cd":"2024-06-05","lat":11.252345,"lon":125.006245,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7123},{"i":8987,"cid":"23IF0084","pid":"P00721552VS","t":"Construction of Matlang Flood Control, Isabel, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"ISABEL (LEYTE)","deo":"Leyte 4th District Engineering Office","co":"COLLERA CONSTRUCTION","c":95674838.32,"abc":96500000.0,"fy":"2023","sd":"05/08/2023","cd":"2023-10-25","lat":10.891471,"lon":124.455421,"sm":650,"fm":650,"tm":650,"am":650,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7124},{"i":8988,"cid":"22ID0030","pid":"P00620331VS","t":"Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+000 - Sta. 0+350 (Downstream), Brgy. Balilit, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":48991679.56,"abc":48999961.53,"fy":"2022","sd":"02/24/2022","cd":"2022-12-29","lat":11.078045,"lon":124.939278,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.02,"wp":[11.07823,124.93934],"wst":"matched","br":"Balilit","len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7125},{"i":8989,"cid":"22MC0029","pid":"P00620277MN","t":"Construction of Malasila River Flood Control L/S, Sitio Patulangon, Brgy. Malasila, Makilala, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / NARAGSAK CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/23/2022","cd":"2023-07-27","lat":6.945929,"lon":125.077786,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.74,"wp":[6.93927,125.07721],"wst":"matched","br":"Malasila","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7126},{"i":8990,"cid":"22ID0056","pid":"P00620462VS","t":"Construction of Binahaan Bank Protection Structure and Drainage system, Binahaan River Basin, Brgy. Cansamada East, Dagami, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"DAGAMI (LEYTE)","deo":"Leyte 2nd District Engineering Office","co":"LANOY CONSTRUCTION","c":48999893.55,"abc":49999895.94,"fy":"2022","sd":"04/06/2022","cd":"2023-04-14","lat":11.077963,"lon":124.939472,"sm":472,"fm":472,"tm":472,"am":472,"md":0.0,"ls":"inside","ww":"Binahaan","wn":"Binahaan River","wd":0.03,"wp":[11.0782,124.93951],"wst":"matched","br":"Cansamada East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7127},{"i":8991,"cid":"23IC0109","pid":"P00721962VS","t":"Construction/Rehabilitation of Flood Control Mitigation Facilities along San Isidro River Downstream, Brgy. San Isidro, Sta. Fe, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"SANTA FE (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"RT BUILDERS","c":48000822.54,"abc":48020000.0,"fy":"2023","sd":"06/13/2023","cd":"2023-12-27","lat":11.200407,"lon":124.939638,"sm":1384,"fm":1384,"tm":1384,"am":1384,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7128},{"i":8992,"cid":"23I00061","pid":"P00721600VS","t":"Construction of Flood Control Structure, Camansihay, Tacloban City","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"TACLOBAN CITY (CAPITAL) (LEYTE)","deo":"Tacloban City District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) / JGO BUILDERS","c":109883701.5,"abc":110974061.7,"fy":"2023","sd":"05/09/2023","cd":"2024-01-26","lat":11.3032,"lon":124.94,"sm":1507,"fm":1507,"tm":1507,"am":1507,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":32,"sig":[{"code":"coarse_pin","group":"location","strength":0.4,"value":2,"text":"Coordinates are recorded with only 2 decimal places (about 1 km precision), which looks like a placeholder.","benign":"The site may simply have been geotagged coarsely."}],"rk":398},{"i":8993,"cid":"22IL0118","pid":"P00633211VS","t":"Construction of Road Slope Protection along Rizal-Aguban Road, Tomas Oppus, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"TOMAS OPPUS (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JGO BUILDERS","c":69299998.43,"abc":69300000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-06-16","lat":10.19816,"lon":124.9412,"sm":1579,"fm":1579,"tm":1579,"am":900,"md":4.4,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":45,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.71,"value":4.4,"text":"The pin is 4.4 km outside Tomas Oppus, Southern Leyte, the nearest municipality the record claims. It falls in Malitbog, Southern Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":243},{"i":8994,"cid":"23KK0112","pid":"P00734370MN","t":"Construction of Flood Control Project along Dangoan Br. 2 River Upstream (Left Side), Medina, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MEDINA (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":74250000.0,"abc":74250000.0,"fy":"2023","sd":"04/25/2023","cd":"2023-11-03","lat":8.91016,"lon":125.00682,"sm":965,"fm":965,"tm":965,"am":965,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7129},{"i":8995,"cid":"23IC0101","pid":"P00733754VS","t":"Construction of Open Drainage Canal, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"QUELLING CONSTRUCTION","c":4930818.93,"abc":4950000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-08-17","lat":11.165256,"lon":125.006938,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":"Open Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7130},{"i":8996,"cid":"24II0074","pid":"P00835030VS","t":"Construction of Flood Mitigation Structure, Brgy. Rawis, Laoang, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAOANG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JBM ENGINEERS AND SUPPLY","c":29300446.86,"abc":29399980.43,"fy":"2024","sd":"04/25/2024","cd":"2024-10-07","lat":12.565534,"lon":125.007967,"sm":752,"fm":752,"tm":752,"am":752,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rawis","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7131},{"i":8997,"cid":"22I00092","pid":"P00620057VS","t":"Construction (Completion) of Storm Surge Protection: Tide Embankment, Subsection 4.6, Brgy. Baras, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"JELM CONSTRUCTION CORP.","c":37233087.6,"abc":37619411.75,"fy":"2022","sd":"08/04/2022","cd":"2023-04-02","lat":11.163767,"lon":125.00829,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baras","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7132},{"i":8998,"cid":"22I00091","pid":"P00620422VS","t":"Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"LEYTE","mu":"PALO (LEYTE)","deo":"Leyte 1st District Engineering Office","co":"AICON INDUSTRIES","c":25725438.95,"abc":25784718.26,"fy":"2022","sd":"12/29/2022","cd":"2023-06-22","lat":11.137761,"lon":125.009318,"sm":1070,"fm":1070,"tm":1070,"am":1070,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Joaquin","len":null,"ph":"Phase 10","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7133},{"i":8999,"cid":"22LB0352","pid":"P00633897MN","t":"Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Wellspring Village Section, Right Bank, Talomo River, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC. / GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-08-20","lat":7.07476,"lon":125.52568,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Catalunan Pequeño","wn":"Catalunan Pequeño Creek","wd":0.37,"wp":[7.0718,125.52416],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9235],"run":[9038,9039,9235],"cl":[],"L":"field","s":61,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 193,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0349 to 22LB0352) cover the same site, together worth PHP 366,700,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":20},{"i":9000,"cid":"22IL0089","pid":"P00631708VS","t":"Construction of Slope Protection Structure along Limasawa Circumferential Road, Limasawa, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"LIMASAWA (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"COLLERA CONSTRUCTION","c":96423465.57,"abc":96500000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-04-20","lat":9.917,"lon":125.078,"sm":793,"fm":793,"tm":793,"am":793,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7134},{"i":9001,"cid":"24ND0019","pid":"P00833604MN","t":"Construction of Drainage, Barangay Bayanihan, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"FHD CONSTRUCTION AND SUPPLY","c":4946981.51,"abc":4946981.51,"fy":"2024","sd":"03/12/2024","cd":"2024-07-24","lat":8.9437,"lon":125.52579,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bayanihan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7135},{"i":9002,"cid":"22II0024","pid":"P00630685VS","t":"Construction of Flood Control Structure, Barangay Tinoblan, Laoang, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAOANG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JUPA CONSTRUCTION / RL TUBA CIVIL ENGINEERING CONSTRUCTION","c":33812940.77,"abc":34299893.87,"fy":"2022","sd":"02/14/2022","cd":"2022-11-08","lat":12.505836,"lon":125.078755,"sm":752,"fm":752,"tm":752,"am":752,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinoblan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7136},{"i":9003,"cid":"21IL0134","pid":"P00549880VS","t":"Construction of Road Slope Protection along Road Leading to Limasawa Heritage Site, Limasawa, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"Limasawa","deo":"Southern Leyte 1st District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / JGO BUILDERS","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"11/22/2021","cd":"2023-02-04","lat":9.923611,"lon":125.078889,"sm":793,"fm":null,"tm":793,"am":793,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7137},{"i":9004,"cid":"22LB0373","pid":"P00633925MN","t":"Construction of Flood Mitigation Structure at Purok 16, Block 2, Barangay Catalunan Pequeño, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-07-27","lat":7.074235,"lon":125.525938,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catalunan Pequeño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7138},{"i":9005,"cid":"25MB0023","pid":"P00935912MN","t":"Construction of Drainage Structure, Camia Street, Barangay Dadiangas East, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION","c":4939993.97,"abc":4950000.0,"fy":"2025","sd":"03/14/2025","cd":"2025-05-12","lat":6.114249,"lon":125.178912,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7139},{"i":9006,"cid":"22IB0005","pid":"P00620322VS","t":"Construction of Flood Control along Oras River, Brgy. Agsam, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES","c":48999959.35,"abc":48984779.46,"fy":"2022","sd":"02/13/2022","cd":"2022-11-11","lat":12.173089,"lon":125.389841,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":"Oras","wn":"Oras River","wd":0.46,"wp":[12.17121,125.39361],"wst":"matched","br":"Agsam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7140},{"i":9007,"cid":"22LA0088","pid":"P00620224MN","t":"Construction of Revetment along Agusan River, Sta. 2+000.000 - Sta. 2+512.382 (LS), Sta. 3+839.493 - Sta. 5+169.202 (LS), Sta. 5+546.574 - Sta. 5+822.483 (LS), Brgy. Katipunan, Maragusan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MARAGUSAN (SAN MARIANO) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"METRO GEAR CONSTRUCTION CORP. / RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY)","c":86842922.3,"abc":86849904.32,"fy":"2022","sd":"04/04/2022","cd":"2023-04-02","lat":7.416889,"lon":126.127147,"sm":931,"fm":931,"tm":931,"am":931,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":23.72,"wp":[7.63065,126.11295],"wst":"matched","br":"Katipunan","len":2118.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7141},{"i":9008,"cid":"24MC0052","pid":"P00820414MN","t":"Construction of Revetment along Malasila River, Sta. 41+533 - Sta. 42 + 333 R/S, Barangay Sta. Filomina, Makilala, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-11-21","lat":6.937931,"lon":125.07916,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.03,"wp":[6.93823,125.07906],"wst":"matched","br":"Sta. Filomina","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7142},{"i":9009,"cid":"22NG0030","pid":"P00630543MN","t":"Construction of Flood Mitigation Structure along Hinagasan River, Barangay Mabuhay, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SISON (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96499885.76,"abc":96500000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-07-27","lat":9.679461,"lon":125.526417,"sm":1469,"fm":1469,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":"Hinagasan","wn":"Hinagasan River","wd":0.0,"wp":[9.67946,125.52643],"wst":"matched","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7143},{"i":9010,"cid":"23IL0010","pid":"P00721605VS","t":"Construction of Shoreline Protection Structure - Newly Converted National Road - along Limasawa Circumferential Road, Limasawa, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"LIMASAWA (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":84374606.74,"abc":84437500.0,"fy":"2023","sd":"02/21/2023","cd":"2024-01-04","lat":9.92358,"lon":125.07924,"sm":793,"fm":793,"tm":793,"am":793,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7144},{"i":9011,"cid":"23KK0073","pid":"P00721540MN","t":"Construction of Revetment at Talisay Bridge (Abutment A and B), Gingoog City, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-27","lat":8.8874,"lon":125.18006,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7145},{"i":9012,"cid":"22KA0016","pid":"P00620113MN","t":"Construction of Flood Control Structure at Brgy. Kalagangan, Sta. 0+200 - Sta. 0+500 (RS) and Sta. 0+400 - Sta. 0+600 (LS), San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"JEJOR'S CONSTRUCTION CORPORATION","c":48955205.61,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-11-21","lat":7.69022,"lon":125.3932,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kalagangan","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7146},{"i":9013,"cid":"22N00092","pid":"P00630533MN","t":"Construction of Bank Protection along Agusan River, Agusan Pequeño Section, Package 1, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":139924995.6,"abc":139925000.0,"fy":"2022","sd":"04/20/2022","cd":"2023-08-20","lat":8.973861,"lon":125.528222,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.28,"wp":[8.97608,125.52953],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7147},{"i":9014,"cid":"22LA0087","pid":"P00620223MN","t":"Construction of Revetment along Agusan River, Sta. 4+400 - Sta. 7+340, Brgy. Tandawan, New Bataan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NEW BATAAN (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":86849347.53,"abc":86849547.62,"fy":"2022","sd":"04/04/2022","cd":"2023-03-02","lat":7.470582,"lon":126.128336,"sm":1019,"fm":1019,"tm":1019,"am":1019,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":17.8,"wp":[7.63065,126.11295],"wst":"matched","br":"Tandawan","len":2940.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.77,"value":17.8,"text":"The title names Agusan, which OpenStreetMap maps through the stated municipality, but the pin is 17.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":203},{"i":9015,"cid":"22IK0034","pid":"P00620218VS","t":"Construction of Flood Control Protection Works Structure, Sawa Bridge, Brgy. Sawa, Basey, Samar along Basey - Sohoton Road, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":22538367.58,"abc":22539999.99,"fy":"2022","sd":"02/14/2022","cd":"2022-10-03","lat":11.307816,"lon":125.081828,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sawa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7148},{"i":9016,"cid":"23KA0163","pid":"P00721534MN","t":"Construction of Flood Mitigation Structure, Purok 4 and Purok 8, Barangay Linabo, Sta. 0 + 000 - Sta. 0 + 207 (BS), Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":96499999.62,"abc":96500000.0,"fy":"2023","sd":"03/13/2023","cd":"2024-03-05","lat":8.065304,"lon":125.180769,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Linabo","len":207.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7149},{"i":9017,"cid":"23KA0105","pid":"P00732050MN","t":"Construction of Flood Mitigation Structure,Barangay Bonacao, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2023-11-21","lat":7.797018,"lon":125.394284,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bonacao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7150},{"i":9018,"cid":"23LA0037","pid":"P00721568MN","t":"Construction of Revetment along Matiao River, Barangay Bongbong Section, Pantukan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"PANTUKAN (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":91673488.29,"abc":91675000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-12-19","lat":7.101505,"lon":125.910311,"sm":1097,"fm":1097,"tm":1097,"am":1097,"md":0.0,"ls":"inside","ww":"Matiao","wn":"Matiao River","wd":0.03,"wp":[7.10159,125.91056],"wst":"matched","br":"Bongbong Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7151},{"i":9019,"cid":"22N00096","pid":"P00630547MN","t":"Construction of Main Drainage Canal along BCIR - JCT Rosales Avenue - LADP CARBDP Main Drainage Channel (Barangay Imadejas to Barangay Libertad) Package 1, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":135099705.3,"abc":135100000.0,"fy":"2022","sd":"04/20/2022","cd":"2023-06-13","lat":8.944336,"lon":125.528794,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"LADP CARBDP Main Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Imadejas","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7152},{"i":9020,"cid":"22LE0028","pid":"P00620056MN","t":"Construction of Concrete Revetment, Capisolon Flood Control, Sta. 0+000 - Sta. 2+000, Jose Abad Santos, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"JOSE ABAD SANTOS (TRINIDAD) (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":68810185.0,"abc":68813185.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-13","lat":5.767601,"lon":125.529279,"sm":675,"fm":675,"tm":675,"am":675,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7153},{"i":9021,"cid":"22IB0073","pid":"P00630677VS","t":"Construction of Flood Control at Barangay San Miguel, Llorente, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"LLORENTE (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"DRAGON CONSTRUCTION","c":9899995.36,"abc":9898988.07,"fy":"2022","sd":"03/31/2022","cd":"2022-08-05","lat":11.439369,"lon":125.529668,"sm":801,"fm":801,"tm":801,"am":801,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Miguel","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7154},{"i":9022,"cid":"23N00093","pid":"P00721326MN","t":"Construction of Ring Dike along Lake Mainit, Barangay Colorado (Jabonga Section), Agusan del Norte","w":"Construction of Dike","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"JABONGA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":120624592.9,"abc":120625000.0,"fy":"2023","sd":"05/30/2023","cd":"2024-06-05","lat":9.321411,"lon":125.529933,"sm":658,"fm":658,"tm":null,"am":658,"md":0.0,"ls":"inside","ww":"Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Colorado","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7155},{"i":9023,"cid":"23N00107","pid":"P00721329MN","t":"Construction of Drainage along Butuan City- Cagayan de Oro-Iligan Road, DBP TO Robinsons Mall R/S including sidewalk, curb and gutter, Butuan City, Agusan Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":192999993.1,"abc":193000000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-10-18","lat":8.945667,"lon":125.531817,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7156},{"i":9024,"cid":"22N00097","pid":"P00630548MN","t":"Construction of Main Drainage Canal along Capitol - Bonbon Road to C.T. Montalban St. to Villa Kananga Creek, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":135099965.5,"abc":135100000.0,"fy":"2022","sd":"04/11/2022","cd":"2023-05-18","lat":8.93653,"lon":125.53232,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Villa Kananga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7157},{"i":9025,"cid":"24ND0113","pid":"P00835855MN","t":"Rehabilitation of Flood Control Drainage System of Lower Agusan Development Project, Langihan Creek Section, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION","c":96482281.4,"abc":96482283.74,"fy":"2024","sd":"06/05/2024","cd":"2024-11-25","lat":8.96194,"lon":125.53278,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Langihan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7158},{"i":9026,"cid":"22LB0358","pid":"P00633910MN","t":"Construction of Drainage at Lanzona Subd. To Shanghai Creek, Barangay Matina Aplaya, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"06/09/2022","cd":"2022-12-26","lat":7.04051,"lon":125.573762,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Lanzona Subd. To Shanghai","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Matina Aplaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7159},{"i":9027,"cid":"22NB0009","pid":"P00620191MN","t":"Construction of Flood Control Project (Boat landing) along Agusan River, Sta. 0+000.00 - Sta. 0+100.00, Esperanza, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"LM CONSTRUCTION AND GENERAL MARKETING","c":26459992.51,"abc":26460000.0,"fy":"2022","sd":"06/03/2022","cd":"2023-04-28","lat":8.673383,"lon":125.644611,"sm":553,"fm":553,"tm":553,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.17,"wp":[8.67282,125.64314],"wst":"matched","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7160},{"i":9028,"cid":"24N00138","pid":"P00820373MN","t":"Construction of Flood Control Structures Along Lake Mainit- Tubay River (Kalinawan-Karak-an Section), Package 4, Tubay, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"TUBAY (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":96499972.48,"abc":96500000.0,"fy":"2024","sd":"05/03/2024","cd":"2024-12-03","lat":9.15349,"lon":125.53294,"sm":1591,"fm":1591,"tm":1591,"am":1591,"md":0.0,"ls":"inside","ww":"Mainit-Tubay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7161},{"i":9029,"cid":"22LE0058","pid":"P00631106MN","t":"Construction of Slope Protection Structure at Barangay Pangian, Malita, Davao Occidental","w":"Construction of Slope Protection Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"DISEM CONSTRUCTION AND SUPPLY","c":14839942.58,"abc":14850000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-07-31","lat":6.452816,"lon":125.533045,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pangian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7162},{"i":9030,"cid":"22LE0042","pid":"P00630349MN","t":"Construction of Slope Protection at Brgy. Pangian, Malita, Davao Occidental","w":"Construction of Slope Protection Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"FORTSTONE CONSTRUCTION ENTERPRISES","c":14695835.77,"abc":14700000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-04","lat":6.453098,"lon":125.53339,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pangian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7163},{"i":9031,"cid":"22N00089","pid":"P00630540MN","t":"Construction of Flood Control Structures along Cabadbaran River Downstream, Package 1, Cabadbaran, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":115799995.1,"abc":115800000.0,"fy":"2022","sd":"06/28/2022","cd":"2023-03-31","lat":9.128375,"lon":125.533474,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":0.08,"wp":[9.12765,125.53349],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7164},{"i":9032,"cid":"23N00184","pid":"P00721651MN","t":"Construction of Flood Control Structures along Lake Mainit - Tubay River (Kalinawan-Karak-an Section), Package 3, Tubay, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"TUBAY (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":159223478.1,"abc":159225000.0,"fy":"2023","sd":"07/20/2023","cd":"2024-01-31","lat":9.154175,"lon":125.534225,"sm":1591,"fm":1591,"tm":1591,"am":1591,"md":0.0,"ls":"inside","ww":"Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7165},{"i":9033,"cid":"21LB0301","pid":"P00550529MN","t":"Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Left Bank, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":86850000.0,"abc":86850000.0,"fy":"2021","sd":"12/05/2021","cd":"2023-06-04","lat":7.058829,"lon":125.534634,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Bago Gallera","wn":"Bago Gallera Creek","wd":1.66,"wp":[7.04755,125.52478],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7166},{"i":9034,"cid":"24N00137","pid":"P00835844MN","t":"Construction of Flood Control Structure Along Cabadbaran River Upstream, Package 3, Cabadbaran City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":192999918.7,"abc":193000000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-05-15","lat":9.12749,"lon":125.53712,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":0.04,"wp":[9.12718,125.53702],"wst":"matched","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7167},{"i":9035,"cid":"22N00095","pid":"P00630542MN","t":"Construction of Flood Mitigation Structure along Banza River at Banza Ruins Section, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":106149994.9,"abc":106150000.0,"fy":"2022","sd":"04/11/2022","cd":"2024-03-06","lat":8.973266,"lon":125.537306,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Banza","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7168},{"i":9036,"cid":"22N00098","pid":"P00630549MN","t":"Construction of Main Drainage Canal along Jct. Montilla Boulevard - Salvador Calo Street to LADP Main Drainage Canal, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":154399819.6,"abc":154400000.0,"fy":"2022","sd":"04/20/2022","cd":"2023-12-02","lat":8.962132,"lon":125.537834,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"LADP Main Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7169},{"i":9037,"cid":"22N00106","pid":"P00620102MN","t":"Construction of Flood Control Structure Along Lake Mainit- Tubay River (Kalinawan-Karak-an Section), Sta. 2+422.75 - Sta. 2+788.00, Package 2, Tubay, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"TUBAY (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":106149980.6,"abc":106150000.0,"fy":"2022","sd":"09/22/2022","cd":"2023-07-31","lat":9.15264,"lon":125.538057,"sm":1591,"fm":1591,"tm":1591,"am":1591,"md":0.0,"ls":"inside","ww":"Mainit-Tubay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":365.2,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7170},{"i":9038,"cid":"22LB0349","pid":"P00633894MN","t":"Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Left Bank, Talomo River, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-04-15","lat":7.06848,"lon":125.53843,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Catalunan Pequeño","wn":"Catalunan Pequeño Creek","wd":0.67,"wp":[7.06983,125.53256],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9039],"run":[9039,9235,8999],"cl":[],"L":"field","s":58,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 173,700,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0349 to 22LB0352) cover the same site, together worth PHP 366,700,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":59},{"i":9039,"cid":"22LB0350","pid":"P00633895MN","t":"Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Right Bank, Talomo River, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-04-28","lat":7.06848,"lon":125.53843,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Catalunan Pequeño","wn":"Catalunan Pequeño Creek","wd":0.67,"wp":[7.06983,125.53256],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9038],"run":[9038,9235,8999],"cl":[],"L":"field","s":58,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 173,700,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0349 to 22LB0352) cover the same site, together worth PHP 366,700,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":60},{"i":9040,"cid":"22NG0013","pid":"P00630648MN","t":"Construction of Riverbank in Barangay Mabini, Mainit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MAINIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48999990.04,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-09-10","lat":9.54061,"lon":125.53856,"sm":881,"fm":881,"tm":881,"am":881,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabini","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7171},{"i":9041,"cid":"22LB0355","pid":"P00633900MN","t":"Construction of Revetment along Talomo - Puan Bypass Bridge Upstream, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/21/2022","cd":"2023-02-10","lat":7.066922,"lon":125.539933,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7172},{"i":9042,"cid":"22IB0038","pid":"P00620180VS","t":"Construction of Flood Control, Poblacion Gen. MacArthur, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"GENERAL MACARTHUR (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"DRAGON CONSTRUCTION","c":25249692.26,"abc":25249702.91,"fy":"2022","sd":"02/13/2022","cd":"2022-10-24","lat":11.24355,"lon":125.540254,"sm":575,"fm":575,"tm":null,"am":575,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7173},{"i":9043,"cid":"22N00141","pid":"P00620257MN","t":"Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+124.935 - Sta. 0+244.00, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / HAPPY ALL3 BUILDERS CORPORATION","c":96495931.27,"abc":96500000.0,"fy":"2022","sd":"08/22/2022","cd":"2024-08-17","lat":8.887806,"lon":125.54039,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.33,"wp":[8.88534,125.54204],"wst":"matched","br":null,"len":119.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7174},{"i":9044,"cid":"24NA0019","pid":"P00821209MN","t":"Construction of Flood Mitigation Structure along Cabadbaran River (Calibunan-Mabini Section), Cabadbaran City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ME 3 CONSTRUCTION","c":96499018.71,"abc":96500000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-08-15","lat":9.109144,"lon":125.540455,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":1.69,"wp":[9.12146,125.54952],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7175},{"i":9045,"cid":"23N00123","pid":"P00732103MN","t":"Construction of Main Drainage Canal along Montilla JCT BCIR - South Montilla Boulevard - LADP Main Drainage Canal Package 1, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":241249035.5,"abc":241250000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-11-15","lat":8.9475,"lon":125.5405,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"LADP Main Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7176},{"i":9046,"cid":"23N00108","pid":"P00721328MN","t":"Construction of Drainage along Jollibee Downtown to Gaisano Mall (Both Sides) including sidewalk, curb and gutter, Butuan City, Agusan Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":289499997.3,"abc":289500000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-12-05","lat":8.947683,"lon":125.540517,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7177},{"i":9047,"cid":"23N00085","pid":"P00732105MN","t":"Construction of Main Drainage Canal Along JCT Montilla Boulevard - T. Calo Street - NRJ BCIR to Main LADP Main Drainage Canal (T. Calo - Ochoa Section), Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":192999392.8,"abc":193000000.0,"fy":"2023","sd":"07/21/2023","cd":"2024-11-30","lat":8.950933,"lon":125.540767,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Main LADP Main Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7178},{"i":9048,"cid":"23N00084","pid":"P00734012MN","t":"Construction (Completion) of Main Drainage Canal Along Montilla JCT Montilla Boulevard - Salvador Calo Street to Main LADP Main Drainage Canal Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":144749612.0,"abc":144750000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-07-30","lat":8.950867,"lon":125.5408,"sm":268,"fm":268,"tm":null,"am":268,"md":0.0,"ls":"inside","ww":"Main LADP Main Drainage","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7179},{"i":9049,"cid":"22LB0354","pid":"P00633899MN","t":"Construction of Revetment along Talomo - Puan Bypass Bridge Upstream, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-04-15","lat":7.064922,"lon":125.541375,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7180},{"i":9050,"cid":"22LB0366","pid":"P00633918MN","t":"Construction of Drainage System at Jesus Soriano National High School, Barangay Catalunan Grande, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"DICON BUILDERS CORP.","c":4899871.34,"abc":4900000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-08-23","lat":7.081855,"lon":125.542584,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catalunan Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7181},{"i":9051,"cid":"22LB0364","pid":"P00633916MN","t":"Construction of Drainage System at Catalunan Grande Elementary School, Barangay Catalunan Grande, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"DINGO BUILDERS AND SUPPLY","c":4899450.44,"abc":4900000.0,"fy":"2022","sd":"06/05/2022","cd":"2022-12-24","lat":7.081227,"lon":125.542789,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catalunan Grande","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7182},{"i":9052,"cid":"25ND0048","pid":"P00920380MN","t":"Construction of Bank Protection, Lower Agusan River, Barangay Golden Ribbon, Butuan City","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION","c":96158174.5,"abc":96455183.12,"fy":"2025","sd":"02/12/2025","cd":"2025-05-30","lat":8.939416,"lon":125.543115,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Lower Agusan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Golden Ribbon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7183},{"i":9053,"cid":"23N00091","pid":"P00721324MN","t":"Construction of Concrete Dike from Aciga River, Poblacion 1 to Kalinawan River, La Paz, Santiago, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"SANTIAGO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"RAMISES CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":144749974.6,"abc":144750000.0,"fy":"2023","sd":"07/25/2023","cd":"2024-07-09","lat":9.258269,"lon":125.544106,"sm":1408,"fm":1408,"tm":1408,"am":1408,"md":0.0,"ls":"inside","ww":"Aciga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7184},{"i":9054,"cid":"23N00111","pid":"P00721332MN","t":"Construction of Drainage System along Butuan City-Cagayan de Oro-Iligan Road, Silongan St. to Jct Montilla Blvd (Both Sides) including sidewalk, curb and gutter, Butuan City, Agusan Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":144749954.9,"abc":144750000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-09-20","lat":8.947283,"lon":125.5442,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7185},{"i":9055,"cid":"23N00116","pid":"P00721337MN","t":"Construction of Riverbank Protection at Magsaysay Bridge, 1st Approach, Butuan City, Agusan Del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY / TRIPARCO DEVELOPMENT CORPORATION","c":144749968.1,"abc":144750000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-04-28","lat":8.94951,"lon":125.54546,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7186},{"i":9056,"cid":"21LB0251","pid":"P00522311MN","t":"Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+747, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":65369100.0,"abc":65369100.0,"fy":"2021","sd":"12/01/2021","cd":"2022-12-18","lat":7.061712,"lon":125.545676,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.06156,125.54556],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[9062,9086,9081,9066,9061,9059],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":456},{"i":9057,"cid":"21LB0296","pid":"P00550520MN","t":"Construction of Revetment along Talomo River, Sta. 3 + 542 to Sta. 3 + 817, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":88780000.0,"abc":88780000.0,"fy":"2021","sd":"12/16/2021","cd":"2023-02-25","lat":7.061323,"lon":125.545761,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.0,"wp":[7.06135,125.54579],"wst":"matched","br":null,"len":275.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7187},{"i":9058,"cid":"23LB0013","pid":"P00721432MN","t":"Construction of Revetment along Talomo River, Puan Bypass Road Bridge Downstream Section, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":76042000.0,"abc":76042000.0,"fy":"2023","sd":"02/20/2023","cd":"2024-03-14","lat":7.060527,"lon":125.546144,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.03,"wp":[7.06069,125.54634],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7188},{"i":9059,"cid":"21LB0253","pid":"P00522313MN","t":"Construction of Revetment along Talomo River, Sta. 3+817 to Sta. 4+022, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":64848000.0,"abc":64848000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-10-17","lat":7.062844,"lon":125.546301,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.0627,125.54633],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[9062,9086,9081,9066,9056,9061],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":457},{"i":9060,"cid":"23LB0074","pid":"P00734375MN","t":"Construction of Revetment along Talomo River, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"04/19/2023","cd":"2023-12-16","lat":7.062616,"lon":125.546466,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.01,"wp":[7.06272,125.54644],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7189},{"i":9061,"cid":"21LB0252","pid":"P00522312MN","t":"Construction of Revetment along Talomo River, Sta. 3+747 to Sta. 3+952, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":65427000.0,"abc":65427000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-12-18","lat":7.062608,"lon":125.546663,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.06276,125.54663],"wst":"matched","br":null,"len":205.0,"ph":null,"dup":[],"run":[9062,9086,9081,9066,9056,9059],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":458},{"i":9062,"cid":"21LB0246","pid":"P00522307MN","t":"Construction of Revetment along Talomo River, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":57900000.0,"abc":57900000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-10-01","lat":7.063271,"lon":125.54851,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.06313,125.54856],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9086,9081,9066,9056,9061,9059],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":459},{"i":9063,"cid":"24IB0018","pid":"P00820125VS","t":"Construction of Llorente Flood Control Structure, K0977+400 - K0978+000, Llorente, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"CITY OF BORONGAN (CAPITAL) (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"JAMA88 BUILDERS INC. / P.B. OBIAL CONSTRUCTION","c":77199970.5,"abc":77200000.0,"fy":"2024","sd":"02/19/2024","cd":"2024-09-16","lat":11.409411,"lon":125.549947,"sm":801,"fm":374,"tm":801,"am":801,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":15.41,"text":"The record contradicts itself: the title and the pin point to Llorente, Eastern Samar, but the municipality field names City of Borongan, Eastern Samar, 15 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":488},{"i":9064,"cid":"22LB0359","pid":"P00633911MN","t":"Construction of Drainage at Puan to Purok 12 San Ignacio, Barangay Talomo Proper, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"DELOUKRIS BUILDERS","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"06/06/2022","cd":"2022-12-03","lat":7.050614,"lon":125.550043,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talomo Proper","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7190},{"i":9065,"cid":"23N00094","pid":"P00721340MN","t":"Repair/Reconstruction of Road Dike along Aciga River, Poblacion 1, Santiago, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"SANTIAGO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"RAMISES CONSTRUCTION / TRIPARCO DEVELOPMENT CORPORATION","c":125449033.6,"abc":125450000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-05-31","lat":9.259403,"lon":125.550522,"sm":1408,"fm":1408,"tm":1408,"am":1408,"md":0.0,"ls":"inside","ww":"Aciga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7191},{"i":9066,"cid":"21LB0250","pid":"P00522306MN","t":"Construction of Flood Mitigation Structure along Talomo River, Teacher's Village Section, Right Bank, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ARCINUE COMM'L CORPORATION / MINDALIFI CONSTRUCTION AND SUPPLY","c":67550000.0,"abc":67550000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-08-26","lat":7.049778,"lon":125.551543,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.0499,125.55166],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9062,9086,9081,9056,9061,9059],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":460},{"i":9067,"cid":"22LB0432","pid":"P00620361MN","t":"Construction of Revetment along Talomo River, Teachers Village Section, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":43425000.0,"abc":43425000.0,"fy":"2022","sd":"06/05/2022","cd":"2024-01-17","lat":7.05063,"lon":125.55213,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.03,"wp":[7.05035,125.55201],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7192},{"i":9068,"cid":"22N00087","pid":"P00630536MN","t":"Construction of Dike with Concrete Revetment along Bangonay River, Downstream Section along Abutment B of the Bridge, Jabonga, Agusan del Norte","w":"Construction of Dike","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"JABONGA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":139924798.9,"abc":139925000.0,"fy":"2022","sd":"04/20/2022","cd":"2023-07-29","lat":9.319549,"lon":125.553626,"sm":658,"fm":658,"tm":658,"am":658,"md":0.0,"ls":"inside","ww":"Bangonay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7193},{"i":9069,"cid":"23NE0019","pid":"P00721397MN","t":"Construction of Flood Control Structure at Paragua Br. I, Barangay General Aguinaldo, Libjo, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"LIBJO (ALBOR) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"R.F. VARQUEZ CONSTRUCTION","c":9795000.0,"abc":9800000.0,"fy":"2023","sd":"03/06/2023","cd":"2023-07-07","lat":10.254722,"lon":125.554444,"sm":780,"fm":780,"tm":780,"am":780,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"General Aguinaldo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7194},{"i":9070,"cid":"21NA0047","pid":"P00522122MN","t":"Construction of Dike with Revetment along Lake Mainit Protecting Daang Maharlika Road (1173+500 - 1174+500 w/ exception), Kitcharao, Agusan del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"Kitcharao","deo":"Agusan del Norte District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":96499998.05,"abc":96500000.0,"fy":"2021","sd":"04/23/2021","cd":"2022-07-27","lat":9.416814,"lon":125.554544,"sm":714,"fm":null,"tm":714,"am":714,"md":0.03,"ls":"boundary","ww":"Mainit Protecting Daang","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7195},{"i":9071,"cid":"22L00145","pid":"P00620360MN","t":"Construction of Revetment along Talomo River, Purok 10 Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"LEDCORE CONSTRUCTION AND DEVELOPMENT CORP, / ABU CONSTRUCTION","c":131775297.1,"abc":135100000.0,"fy":"2022","sd":"06/08/2022","cd":"2023-05-30","lat":7.048253,"lon":125.555031,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.01,"wp":[7.04835,125.55506],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7196},{"i":9072,"cid":"24ND0024","pid":"P00820212MN","t":"Construction of Larpis Slope Protection Works, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":14694455.68,"abc":14694467.22,"fy":"2024","sd":"05/08/2024","cd":"2024-11-05","lat":8.87067,"lon":125.55525,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7197},{"i":9073,"cid":"23LH0013","pid":"P00721498MN","t":"Construction of Concrete Revetment along Davao River, New Valencia Section, Sta. 0 + 000 - Sta. 0 + 500, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":47576550.62,"abc":49000000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-10-06","lat":7.177086,"lon":125.555808,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.01,"wp":[7.17704,125.55587],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7198},{"i":9074,"cid":"22NA0005","pid":"P00620101MN","t":"Construction of Dike with Concrete Revetment along Puyo River, Downstream Section along Abutment A of the Bridge, Sta. 0+000.00 - Sta. 0+500.00, Jabonga, Agusan del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"JABONGA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":77199989.47,"abc":77200000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-10-17","lat":9.322951,"lon":125.555879,"sm":658,"fm":658,"tm":658,"am":658,"md":0.0,"ls":"inside","ww":"Puyo","wn":"Puyo River","wd":0.41,"wp":[9.31957,125.55428],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7199},{"i":9075,"cid":"23N00114","pid":"P00721334MN","t":"Construction of Flood Mitigation Structure along Tagabaka Creek, Downstream with RCBC Improvement, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":173699926.0,"abc":173700000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-05-31","lat":8.893853,"lon":125.556114,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Tagabaka","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7200},{"i":9076,"cid":"24NA0020","pid":"P00820208MN","t":"Construction of Baleguian CIS Slope Protection Works, Jabonga, Agusan del Norte","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"JABONGA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":19599997.21,"abc":19600000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-14","lat":9.356561,"lon":125.55653,"sm":658,"fm":658,"tm":658,"am":658,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7201},{"i":9077,"cid":"22ND0057","pid":"P00634124MN","t":"Construction of Flood Control Structure along Tagabaca-Aupagan, Phase 1, Butuan City","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"NORTHERN BUILDERS","c":98971642.71,"abc":98971666.04,"fy":"2022","sd":"07/13/2022","cd":"2023-05-12","lat":8.893641,"lon":125.558183,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7202},{"i":9078,"cid":"22L00013","pid":"P00620359MN","t":"Construction of Revetment along Talomo River, Outfall Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"GENESIS88 CONSTRUCTION INC. / GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":144744450.1,"abc":144750000.0,"fy":"2022","sd":"07/11/2022","cd":"2024-03-12","lat":7.047117,"lon":125.558669,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.03,"wp":[7.04739,125.55876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7203},{"i":9079,"cid":"22NA0028","pid":"P00630564MN","t":"Improvement of Cabadbaran River Control Structure (Dinabukan-Mabini Section), Cabadbaran City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"DATREBIL CONSTRUCTION & SUPPLY","c":96499999.47,"abc":96500000.0,"fy":"2022","sd":"04/10/2022","cd":"2023-04-18","lat":9.108824,"lon":125.560391,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":1.31,"wp":[9.12062,125.5601],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7204},{"i":9080,"cid":"24NA0025","pid":"P00821208MN","t":"Rehabilitation of Cabadbaran River Bay-Ang-Pandanon Section, Cabadbaran City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"JD-RG CONSTRUCTION AND SUPPLIES CORP. (FORMERLY: JD-RG CONSTRUCTION CORPORATION)","c":95534997.85,"abc":96500000.0,"fy":"2024","sd":"03/26/2024","cd":"2024-08-07","lat":9.108906,"lon":125.560661,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":1.3,"wp":[9.12062,125.5601],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7205},{"i":9081,"cid":"21LB0248","pid":"P00522309MN","t":"Construction of Revetment along Talomo River, Sta. 0+000 - Sta. 0+213, Sta. 0+405 - Sta. 0+460,Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2023-04-15","lat":7.046261,"lon":125.561111,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.03,"wp":[7.04648,125.56121],"wst":"matched","br":null,"len":268.0,"ph":null,"dup":[],"run":[9062,9086,9066,9056,9061,9059],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":231},{"i":9082,"cid":"24NA0003","pid":"P00820387MN","t":"Construction of Guinoyoran River Flood Control (Downstream Section), Santiago, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"SANTIAGO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ERRA CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY ERRA CONSTRUCTION)","c":48249968.08,"abc":49000000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-04","lat":9.23169,"lon":125.561476,"sm":1408,"fm":1408,"tm":1408,"am":1408,"md":0.0,"ls":"inside","ww":"Guinoyoran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7206},{"i":9083,"cid":"22LB0290","pid":"P00620365MN","t":"Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Right Bank) going to Matina River Outfall, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/05/2022","cd":"2023-04-15","lat":7.076978,"lon":125.561595,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina Pangi","wn":"Matina Pangi Creek","wd":0.02,"wp":[7.07684,125.56168],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9088,9089,9085],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0287 to 22LB0290) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":232},{"i":9084,"cid":"23ND0037","pid":"P00721486MN","t":"Construction of River Bank Protection at Pianing Bridge along Butuan City-Pianing-Tandag Rd, Butuan City, Agusan del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"NORTHERN BUILDERS","c":86847002.2,"abc":86847002.41,"fy":"2023","sd":"03/21/2023","cd":"2023-12-20","lat":8.98527,"lon":125.56161,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7207},{"i":9085,"cid":"22LB0289","pid":"P00620364MN","t":"Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Left Bank) going to Matina River Outfall, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/05/2022","cd":"2023-04-15","lat":7.076963,"lon":125.561707,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina Pangi","wn":"Matina Pangi Creek","wd":0.01,"wp":[7.07685,125.56173],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9088,9089,9083],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0287 to 22LB0290) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":233},{"i":9086,"cid":"21LB0247","pid":"P00522308MN","t":"Construction of Revetment along Talomo River, NHA Bangkal Section, Sta. 0+180 - Sta. 0+405, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"KODUS PEERS CONSTRUCTION CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2023-03-20","lat":7.046644,"lon":125.561735,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.04,"wp":[7.04631,125.56158],"wst":"matched","br":null,"len":225.0,"ph":null,"dup":[],"run":[9062,9081,9066,9056,9061,9059],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":7,"text":"7 contracts with consecutive numbers (21LB0246 to 21LB0253) cover the same site, together worth PHP 514,094,100.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":234},{"i":9087,"cid":"23LE0017","pid":"P00721281MN","t":"Construction of Concrete Revetment (RC Cut-off Wall), Pangian Flood Control, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP.","c":86840559.07,"abc":86850000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-11-02","lat":6.45686,"lon":125.561785,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7208},{"i":9088,"cid":"22LB0287","pid":"P00620362MN","t":"Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Matina Pangi Section, Left Bank) going to Matina River Outfall, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-04-15","lat":7.076958,"lon":125.563303,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina Pangi","wn":"Matina Pangi Creek","wd":0.01,"wp":[7.07688,125.56336],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9089,9085,9083],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0287 to 22LB0290) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":235},{"i":9089,"cid":"22LB0288","pid":"P00620363MN","t":"Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Matina Pangi Section, Right Bank) going to Matina River Outfall, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"06/06/2022","cd":"2023-04-15","lat":7.0769,"lon":125.563424,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina Pangi","wn":"Matina Pangi Creek","wd":0.0,"wp":[7.07692,125.56341],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9088,9085,9083],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0287 to 22LB0290) cover the same site, together worth PHP 386,000,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":236},{"i":9090,"cid":"22LB0360","pid":"P00633912MN","t":"Construction of Drainage at Purok 2 & 3 Albios Compound, Barangay Langub, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-09-08","lat":7.098745,"lon":125.563618,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Langub","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7209},{"i":9091,"cid":"21LB0293","pid":"P00550537MN","t":"Construction of Revetment along Matina River, Outfall Section, Sta. 0+465 to Sta. 0+790, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS","c":94273146.01,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2024-08-31","lat":7.04864,"lon":125.56413,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.04868,125.56414],"wst":"matched","br":null,"len":325.0,"ph":null,"dup":[],"run":[9094,9095],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21LB0292 to 21LB0294) cover the same site, together worth PHP 258,102,205.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":374},{"i":9092,"cid":"22LB0368","pid":"P00633920MN","t":"Construction of Drainage System at Purok 3 Centro, Barangay Langub, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"SNAS CONSTRUCTION AND SUPPLIES","c":6736112.96,"abc":6860000.0,"fy":"2022","sd":"06/07/2022","cd":"2022-11-17","lat":7.097771,"lon":125.56429,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Langub","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7210},{"i":9093,"cid":"21LB0289","pid":"P00550538MN","t":"Construction of Seawall at NHA Bangkal Relocation, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2023-05-25","lat":7.045263,"lon":125.564822,"sm":500,"fm":null,"tm":500,"am":500,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7211},{"i":9094,"cid":"21LB0292","pid":"P00550536MN","t":"Construction of Revetment along Matina River, Outfall Section, Sta. 0+115 to Sta. 0+465, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MRD GEMPESAW CONSTRUCTION CORP. / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-10-31","lat":7.046104,"lon":125.565112,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.0461,125.56514],"wst":"matched","br":null,"len":350.0,"ph":null,"dup":[],"run":[9091,9095],"cl":[],"L":"field","s":41,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21LB0292 to 21LB0294) cover the same site, together worth PHP 258,102,205.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":237},{"i":9095,"cid":"21LB0294","pid":"P00550531MN","t":"Construction of Flood Mitigation Structure along Matina River, Sta. 1+460 - Sta. 1+667, Left Bank, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"TKS BUILDERS & SUPPLIES / LEDCORE CONSTRUCTION AND DEVELOPMENT CORP,","c":67329059.28,"abc":67550000.0,"fy":"2021","sd":"12/22/2021","cd":"2022-08-13","lat":7.054023,"lon":125.56512,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.05402,125.56513],"wst":"matched","br":null,"len":207.0,"ph":null,"dup":[],"run":[9094,9091],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (21LB0292 to 21LB0294) cover the same site, together worth PHP 258,102,205.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":461},{"i":9096,"cid":"23LB0142","pid":"P00734395MN","t":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+500 to Sta. 7+800 Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. / GENESIS88 CONSTRUCTION INC.","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-11-25","lat":7.07782,"lon":125.565879,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.01,"wp":[7.07773,125.56597],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7212},{"i":9097,"cid":"22NA0006","pid":"P00620188MN","t":"Construction of Flood Control Structure, Tagmamarkay River (Upstream Section), Tubay, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"TUBAY (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ERRA CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY ERRA CONSTRUCTION)","c":41985061.75,"abc":41985160.0,"fy":"2022","sd":"02/17/2022","cd":"2022-07-26","lat":9.216647,"lon":125.566007,"sm":1591,"fm":1591,"tm":1591,"am":1591,"md":0.0,"ls":"inside","ww":"Tagmamarkay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7213},{"i":9098,"cid":"20LB0027","pid":"P00420010MN","t":"Construction of Revetment along Matina River, Sta. 3+060 to Sta. 3+520, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"A.Y.U. ENGINEERING & CONSTRUCTION / ABU CONSTRUCTION","c":86136865.0,"abc":86136865.0,"fy":"2020","sd":"12/13/2020","cd":"2023-03-20","lat":7.0608,"lon":125.56677,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.06079,125.56675],"wst":"matched","br":null,"len":460.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7214},{"i":9099,"cid":"20LB0027","pid":"P00420010MN","t":"Construction of Revetment along Matina River, Sta. 3+060 to Sta. 3+520, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"A.Y.U. ENGINEERING & CONSTRUCTION / ABU CONSTRUCTION","c":86136865.0,"abc":86136865.0,"fy":"2021","sd":"12/13/2020","cd":"2023-03-20","lat":7.0608,"lon":125.56677,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.06079,125.56675],"wst":"matched","br":null,"len":460.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7215},{"i":9100,"cid":"23LB0141","pid":"P00734394MN","t":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+000 to Sta. 7+300 Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. / GENESIS88 CONSTRUCTION INC.","c":99000000.0,"abc":99000000.0,"fy":"2023","sd":"05/30/2023","cd":"2023-12-16","lat":7.078124,"lon":125.566944,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.01,"wp":[7.07818,125.56694],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7216},{"i":9101,"cid":"23LE0034","pid":"P00721577MN","t":"Construction of Tubalan Flood Control Structure, Malita, Davao Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/05/2023","cd":"2024-02-20","lat":6.491817,"lon":125.566949,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7217},{"i":9102,"cid":"20LB0170","pid":"P00444620MN","t":"Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":26055000.0,"abc":26055000.0,"fy":"2020","sd":"12/17/2020","cd":"2022-07-19","lat":7.060275,"lon":125.567435,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.06034,125.56758],"wst":"matched","br":null,"len":190.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7218},{"i":9103,"cid":"20LB0170","pid":"P00444620MN","t":"Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":26055000.0,"abc":26055000.0,"fy":"2021","sd":"12/17/2020","cd":"2022-07-19","lat":7.060275,"lon":125.567435,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.06034,125.56758],"wst":"matched","br":null,"len":190.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7219},{"i":9104,"cid":"22NG0021","pid":"P00630650MN","t":"Construction of Timamana Flood Control Structure, Tubod, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TUBOD (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":48996788.08,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-09-22","lat":9.594253,"lon":125.567803,"sm":1596,"fm":1596,"tm":1596,"am":1596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7220},{"i":9105,"cid":"22NG0016","pid":"P00630641MN","t":"Construction of Flood Mitigation Structure (Bad-as Flood Control), Bad-as, Placer, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"PLACER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48999966.7,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-28","lat":9.63016,"lon":125.56808,"sm":1151,"fm":1151,"tm":1151,"am":1151,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7221},{"i":9106,"cid":"20LB0253","pid":"P00444621MN","t":"Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":38600000.0,"abc":38600000.0,"fy":"2020","sd":"12/17/2020","cd":"2022-08-17","lat":7.060065,"lon":125.568644,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.06022,125.5686],"wst":"matched","br":null,"len":255.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7222},{"i":9107,"cid":"20LB0253","pid":"P00444621MN","t":"Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":38600000.0,"abc":38600000.0,"fy":"2021","sd":"12/17/2020","cd":"2022-08-17","lat":7.060065,"lon":125.568644,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.06022,125.5686],"wst":"matched","br":null,"len":255.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7223},{"i":9108,"cid":"23LB0012","pid":"P00721431MN","t":"Construction of Revetment along Matina River, Matina Pangi Road Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":94500000.0,"abc":94570000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-11-25","lat":7.072525,"lon":125.568797,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.01,"wp":[7.07262,125.56888],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7224},{"i":9109,"cid":"21LB0299","pid":"P00550535MN","t":"Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":87573750.0,"abc":87573750.0,"fy":"2021","sd":"12/05/2021","cd":"2023-05-31","lat":7.062717,"lon":125.569071,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.0628,125.56919],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7225},{"i":9110,"cid":"24NE0030","pid":"P00820127MN","t":"Construction of Shore Protection at Barangay Poblacion-Barangay San Juan, San Jose, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"SAN JOSE (CAPITAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)","c":72374922.41,"abc":72375000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-10-30","lat":10.006686,"lon":125.56942,"sm":1304,"fm":1304,"tm":1304,"am":1304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion-Barangay San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7226},{"i":9111,"cid":"24NA0031","pid":"P00821097MN","t":"Construction of Mamkas Flood Control Project, Package 2, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"KITCHARAO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":24418718.81,"abc":24500000.0,"fy":"2024","sd":"04/23/2024","cd":"2024-08-25","lat":9.454474,"lon":125.569712,"sm":714,"fm":714,"tm":null,"am":714,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7227},{"i":9112,"cid":"23L00030","pid":"P00721428MN","t":"Construction of Revetment along Matina River, Matina Pangi Bridge II Downstream, Both Banks, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC. / ABU CONSTRUCTION","c":188175000.0,"abc":188175000.0,"fy":"2023","sd":"08/14/2023","cd":"2024-09-30","lat":7.067658,"lon":125.569844,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.0,"wp":[7.06767,125.56985],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7228},{"i":9113,"cid":"23LB0011","pid":"P00721430MN","t":"Construction of Revetment along Matina River, Asico Bridge Upstream Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":94500000.0,"abc":94570000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-12-29","lat":7.070818,"lon":125.56992,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.01,"wp":[7.07095,125.56991],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7229},{"i":9114,"cid":"22LB0285","pid":"P00620358MN","t":"Construction of Revetment along Matina River, Asico Bridge Upstream Section, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":72375000.0,"abc":72375000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-02-24","lat":7.071097,"lon":125.570269,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.01,"wp":[7.07101,125.57029],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7230},{"i":9115,"cid":"22NG0027","pid":"P00630643MN","t":"Construction of Flood Mitigation Structure, Motorpool, Tubod, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TUBOD (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48999671.93,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-10","lat":9.59421,"lon":125.57028,"sm":1596,"fm":1596,"tm":1596,"am":1596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7231},{"i":9116,"cid":"22NE0048","pid":"P00631115MN","t":"Construction of Flood Control Structure, Barangay San Juan, San Jose, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"SAN JOSE (CAPITAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"RJB CONSTRUCTION & SUPPLY","c":4946614.79,"abc":4950000.0,"fy":"2022","sd":"03/15/2022","cd":"2022-08-11","lat":10.010092,"lon":125.570364,"sm":1304,"fm":1304,"tm":1304,"am":1304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7232},{"i":9117,"cid":"22N00110","pid":"P00620256MN","t":"Construction of Flood Mitigation Structure along Agusan River (Tungao Section) Package 2, Sta. 0+228.00 - Sta. 0+355.00, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":97321479.64,"abc":97322180.0,"fy":"2022","sd":"12/06/2022","cd":"2023-11-15","lat":8.779509,"lon":125.570642,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.24,"wp":[8.77963,125.57286],"wst":"matched","br":null,"len":127.0,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7233},{"i":9118,"cid":"21LB0298","pid":"P00550534MN","t":"Construction of Revetment along Matina River, Matina Pangi Bridge-I Upstream, Matina Pangi Section, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"THREE W BUILDERS, INC.","c":85306000.0,"abc":85306000.0,"fy":"2021","sd":"12/05/2021","cd":"2023-03-27","lat":7.068029,"lon":125.570941,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.06816,125.57091],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7234},{"i":9119,"cid":"20LB0014","pid":"P00420401MN","t":"Construction of Flood Mitigation Structure, Davao City Div Rd, La Verna Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67550000.0,"abc":67550000.0,"fy":"2020","sd":"12/16/2020","cd":"2022-12-20","lat":7.26229,"lon":125.57102,"sm":500,"fm":null,"tm":500,"am":410,"md":2.11,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7235},{"i":9120,"cid":"20LB0014","pid":"P00420401MN","t":"Construction of Flood Mitigation Structure, Davao City Div Rd, La Verna Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67550000.0,"abc":67550000.0,"fy":"2021","sd":"12/16/2020","cd":"2022-12-20","lat":7.26229,"lon":125.57102,"sm":500,"fm":null,"tm":500,"am":410,"md":2.11,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7236},{"i":9121,"cid":"22LB0030","pid":"P00620077MN","t":"Construction of Revetment along Matina River, Sta. 6+207 - Sta. 6+440, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":75270000.0,"abc":75270000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-02-28","lat":7.071783,"lon":125.572192,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Matina","wn":"Matina River","wd":0.02,"wp":[7.07167,125.57204],"wst":"matched","br":null,"len":233.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7237},{"i":9122,"cid":"21N00094","pid":"P00522126MN","t":"Construction of Flood Mitigation Structures along Agusan River (Tungao Section) Package 1, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"Butuan City","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":96499728.2,"abc":96500000.0,"fy":"2021","sd":"08/16/2021","cd":"2023-03-15","lat":8.776698,"lon":125.573086,"sm":268,"fm":null,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.1,"wp":[8.77723,125.57383],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7238},{"i":9123,"cid":"24MC0053","pid":"P00820415MN","t":"Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-11-21","lat":6.938328,"lon":125.081866,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.05,"wp":[6.93862,125.08151],"wst":"matched","br":"Sta. Filomina","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7239},{"i":9124,"cid":"23IK0044","pid":"P00732049VS","t":"Construction of Flood Control Structure, Barangay Tinabanan, Marabut, Western Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"MARABUT (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"ETAN CONSTRUCTION","c":19456364.68,"abc":19599998.1,"fy":"2023","sd":"04/03/2023","cd":"2023-08-04","lat":11.208333,"lon":125.183611,"sm":929,"fm":929,"tm":929,"am":929,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinabanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7240},{"i":9125,"cid":"22LA0046","pid":"P00630766MN","t":"Construction of Revetment along Mawab River, Barangay Poblacion, Mawab, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MAWAB (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":67549897.37,"abc":67549897.37,"fy":"2022","sd":"02/23/2022","cd":"2022-12-13","lat":7.80907,"lon":125.918212,"sm":959,"fm":959,"tm":959,"am":989,"md":27.18,"ls":"outside","ww":"Mawab","wn":"Mawab River","wd":24.6,"wp":[7.58681,125.92049],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":73,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.98,"value":27.18,"text":"The pin is 27.2 km outside Mawab, Compostela Valley, the nearest municipality the record claims. It falls in Montevista, Compostela Valley.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.81,"value":24.6,"text":"The title names Mawab, which OpenStreetMap maps through the stated municipality, but the pin is 24.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":42},{"i":9126,"cid":"24NA0009","pid":"P00820386MN","t":"Construction of Guihao-an Riverbank Protection along Barangay Rizal, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ERRA CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY ERRA CONSTRUCTION)","c":67324492.17,"abc":67550000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-07-31","lat":8.927217,"lon":125.398856,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":"Guihao-an","wn":"Guihao-an River","wd":0.02,"wp":[8.92712,125.39874],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7241},{"i":9127,"cid":"23LG0051","pid":"P00721289MN","t":"Construction of Flood Mitigation Structure along Camogna River, Governor Generoso, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"GOVERNOR GENEROSO (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-06","lat":6.677858,"lon":126.136586,"sm":593,"fm":593,"tm":593,"am":593,"md":0.0,"ls":"inside","ww":"Camogna","wn":"Camogna River","wd":3.31,"wp":[6.66602,126.10911],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.31,"text":"The title names Camogna, which OpenStreetMap maps through the stated municipality, but the pin is 3.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":404},{"i":9128,"cid":"23K00141","pid":"P00721413MN","t":"Construction of Flood Mitigation Structure along Pulangi River, Package 2, San Isidro, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":184139315.4,"abc":188000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-02-21","lat":7.965886,"lon":125.188094,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.06,"wp":[7.96617,125.18764],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7242},{"i":9129,"cid":"22MC0030","pid":"P00620237MN","t":"Construction of Flood Control Dike along Kabacan River R/S, Brgy. Inac, Magpet, North Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-11-30","lat":7.128455,"lon":125.083444,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.02,"wp":[7.12861,125.08352],"wst":"matched","br":"Inac","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7243},{"i":9130,"cid":"21LA0214","pid":"P00550463MN","t":"Construction of Drainage, Poblacion, Mawab, Davao de Oro","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"Mawab","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":8818897.77,"abc":8819892.15,"fy":"2021","sd":"03/24/2022","cd":"2022-09-18","lat":7.509496,"lon":125.920741,"sm":959,"fm":null,"tm":959,"am":959,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7244},{"i":9131,"cid":"22LB0198","pid":"P00630602MN","t":"Improvement of Drainage Canal, Purok 4 to Purok 8, Lapu-Lapu, Agdao District, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-02-22","lat":7.099586,"lon":125.644625,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7245},{"i":9132,"cid":"23NA0036","pid":"P00734035MN","t":"Construction of Mamkas Flood Control Project, Brgy. Mamkas, Kitcharao, Agusan del Norte (Package 2)","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"KITCHARAO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":29057806.81,"abc":29400000.0,"fy":"2023","sd":"05/11/2023","cd":"2024-01-10","lat":9.452495,"lon":125.574659,"sm":714,"fm":714,"tm":714,"am":714,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mamkas","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7246},{"i":9133,"cid":"22LD0102","pid":"P00644823MN","t":"Rehabilitation of Concrete Revetment along Malalag, Davao del Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MALALAG (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES / ACC GOLDEN CONSTRUCTION SERVICES","c":48250000.0,"abc":48250000.0,"fy":"2022","sd":"03/30/2023","cd":"2023-09-17","lat":6.598815,"lon":125.398857,"sm":888,"fm":888,"tm":null,"am":888,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7247},{"i":9134,"cid":"23NA0001","pid":"P00721344MN","t":"Construction of Guihao-an River Bank Protection along Guihao-an Bridge with Rechannelization, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ADFIL CORPORATION","c":96498619.17,"abc":96500000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-10-18","lat":8.971045,"lon":125.399812,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":"Guihao-an","wn":"Guihao-an River","wd":0.02,"wp":[8.97112,125.39998],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7248},{"i":9135,"cid":"23LD0017","pid":"P00732488MN","t":"Construction of Seawall at Purok 2, Barangay Baybay, Malalag, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MALALAG (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"R.C. MELGAZO BUILDERS","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-05-01","lat":6.603991,"lon":125.401295,"sm":888,"fm":888,"tm":888,"am":888,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baybay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7249},{"i":9136,"cid":"24NA0002","pid":"P00820124MN","t":"Construction of Flood Mitigation Structure in Barangay Rizal, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":48229136.27,"abc":49000000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-07-17","lat":8.924918,"lon":125.401356,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7250},{"i":9137,"cid":"23NA0006","pid":"P00721345MN","t":"Construction of Guihao-an River Bank Protection along Barangay Rizal with Rechannelization, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ERRA CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY ERRA CONSTRUCTION) / ROIM BUILDERS & CONSTRUCTION SUPPLY","c":96499998.2,"abc":96500000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-09-15","lat":8.925049,"lon":125.402685,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":"Guihao-an","wn":"Guihao-an River","wd":0.02,"wp":[8.92483,125.40264],"wst":"matched","br":"Rizal with Rechannelization","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7251},{"i":9138,"cid":"23NG0128","pid":"P00746151MN","t":"Rehabilitation/ Reconstruction of Tinago Flood Control, Right Bank, Barangay Tinago, Malimono, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"SANTECH  BUILDERS CORPORATION","c":144749996.6,"abc":144750000.0,"fy":"2023","sd":"01/15/2024","cd":"2024-12-15","lat":9.6106,"lon":125.40463,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7252},{"i":9139,"cid":"23M00047","pid":"P00721303MN","t":"Construction of Flood Control Structure at Sitio Buenavista, Barangay Pag- Asa, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"REYDAN BUILDERS","c":77186230.46,"abc":77200000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-11-15","lat":6.10943,"lon":125.40468,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pag- Asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7253},{"i":9140,"cid":"23NG0125","pid":"P00746150MN","t":"Rehabilitation/ Reconstruction of Tinago Flood Control, Left Bank, Barangay Tinago, Malimono, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":144749996.8,"abc":144750000.0,"fy":"2023","sd":"01/15/2024","cd":"2024-12-15","lat":9.610578,"lon":125.40503,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7254},{"i":9141,"cid":"24ME0037","pid":"P00820201MN","t":"Construction of Malapatan Flood Mitigation Structure, Malapatan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"EDCL CONSTRUCTION AND SUPPLY","c":29385001.95,"abc":29400000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-08-10","lat":6.01658,"lon":125.41034,"sm":890,"fm":890,"tm":890,"am":890,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7255},{"i":9142,"cid":"21LD0053","pid":"P00522202MN","t":"Construction/Upgrading/Rehabilitation of Drainage Outfall - Davao-Cotabato Road (Davao City-Jct Digos Section) Outfall Loay Section, Sta. Cruz, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Santa Cruz","deo":"Davao del Sur District Engineering Office","co":"VIBRANIUM BUILDERS CORPORATION","c":29399992.54,"abc":29400000.0,"fy":"2021","sd":"01/05/2022","cd":"2022-08-01","lat":6.84382,"lon":125.41142,"sm":1377,"fm":null,"tm":1377,"am":1377,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7256},{"i":9143,"cid":"23LD0008","pid":"P00721279MN","t":"Construction of Flood Mitigation Structure, Pilan River, Sta. Cruz, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":62725000.0,"abc":62725000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-16","lat":6.835302,"lon":125.41151,"sm":1377,"fm":1377,"tm":1377,"am":1377,"md":0.0,"ls":"inside","ww":"Pilan","wn":"Pilan River","wd":0.01,"wp":[6.83538,125.41158],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7257},{"i":9144,"cid":"24NA0023","pid":"P00821203MN","t":"Construction of Flood Control Structure along Matabao Creek, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"JD-RG CONSTRUCTION AND SUPPLIES CORP. (FORMERLY: JD-RG CONSTRUCTION CORPORATION)","c":96486681.01,"abc":96500000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-09-20","lat":8.969768,"lon":125.412863,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":"Matabao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7258},{"i":9145,"cid":"22LH0118","pid":"P00630594MN","t":"Construction of Drainage System with Box Culvert in Purok 3, Barangay Tagluno, Toril District","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ZULAR-AZ CONSTRUCTION AND SUPPLY, INC.","c":9671178.66,"abc":9800000.0,"fy":"2022","sd":"04/22/2022","cd":"2022-09-30","lat":7.064066,"lon":125.413022,"sm":500,"fm":500,"tm":null,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tagluno","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7259},{"i":9146,"cid":"23NG0129","pid":"P00746154MN","t":"Rehabilitation/ Reconstruction of Cansayong Flood Control, Barangay Cansayong, Malimono, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":144749721.9,"abc":144750000.0,"fy":"2023","sd":"01/15/2024","cd":"2024-11-26","lat":9.57809,"lon":125.41312,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cansayong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7260},{"i":9147,"cid":"23IB0060","pid":"P00732044VS","t":"Construction of Drainage System, Barangay Poblacion, Taft, Eastern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"TAFT (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"ST. ROCH CONSTRUCTION","c":9899996.18,"abc":9899999.97,"fy":"2023","sd":"04/10/2023","cd":"2023-10-23","lat":11.905656,"lon":125.413465,"sm":1509,"fm":1509,"tm":1509,"am":1509,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7261},{"i":9148,"cid":"22NG0040","pid":"P00630636MN","t":"Construction of Flood Control in Barangay Masgad, Malimono, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"RJB CONSTRUCTION & SUPPLY","c":19419790.5,"abc":19600000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-07-01","lat":9.56741,"lon":125.41828,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masgad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7262},{"i":9149,"cid":"22N00088","pid":"P00630141MN","t":"Construction of Flood Mitigation Structures, Cabalalahan Creek along Cabalalahan Bridge, Package 2, Buenavista, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUENAVISTA (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":125449709.1,"abc":125450000.0,"fy":"2022","sd":"10/07/2022","cd":"2023-10-22","lat":8.884138,"lon":125.418549,"sm":240,"fm":240,"tm":240,"am":240,"md":0.0,"ls":"inside","ww":"Cabalalahan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7263},{"i":9150,"cid":"24NG0050","pid":"P00836200MN","t":"Construction of Tinago Flood Control Structure, Brgy. Tinago, Malimono, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / LPO1 GROUP OF COMPANIES INC.","c":98999840.66,"abc":99000000.0,"fy":"2024","sd":"06/28/2024","cd":"2025-02-27","lat":9.615778,"lon":125.419028,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tinago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7264},{"i":9151,"cid":"22IB0076","pid":"P00630678VS","t":"Construction of River Control at Barangay Malobago, Maydolong, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"MAYDOLONG (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"TUBIGAN BUILDERS","c":4949994.6,"abc":4949998.65,"fy":"2022","sd":"04/07/2022","cd":"2022-07-12","lat":11.503365,"lon":125.419183,"sm":961,"fm":961,"tm":961,"am":961,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Malobago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7265},{"i":9152,"cid":"23NG0126","pid":"P00746153MN","t":"Rehabilitation/ Reconstruction of Masgad Flood Control, Barangay Masgad, Malimono, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"SANTECH  BUILDERS CORPORATION","c":144749283.6,"abc":144750000.0,"fy":"2023","sd":"01/15/2024","cd":"2024-11-21","lat":9.56822,"lon":125.41962,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masgad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7266},{"i":9153,"cid":"23NG0043","pid":"P00734002MN","t":"Construction of Flood Control in Barangay Masgad, Malimono, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":96499988.91,"abc":96500000.0,"fy":"2023","sd":"05/09/2023","cd":"2024-04-12","lat":9.56897,"lon":125.42303,"sm":896,"fm":896,"tm":896,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Masgad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7267},{"i":9154,"cid":"22NG0018","pid":"P00630632MN","t":"Construction of Anao-aon Flood Control Structure, Barangay Poblacion, San Francisco, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SAN FRANCISCO (ANAO-AON) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":39199647.2,"abc":39200000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-11-14","lat":9.7748,"lon":125.42721,"sm":1280,"fm":1280,"tm":1280,"am":1280,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7268},{"i":9155,"cid":"23N00132","pid":"P00721341MN","t":"Construction of River Flood Control Along Cantapoy Bridge along Surigao - West Coastal Road, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MALIMONO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":154399963.3,"abc":154400000.0,"fy":"2023","sd":"04/18/2023","cd":"2024-03-15","lat":9.54217,"lon":125.42783,"sm":896,"fm":896,"tm":null,"am":896,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7269},{"i":9156,"cid":"22IB0013","pid":"P00620324VS","t":"Construction of Flood Control along Brgy. Saurong, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":48999985.68,"abc":48984764.4,"fy":"2022","sd":"04/05/2022","cd":"2023-01-02","lat":12.176118,"lon":125.432857,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Saurong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7270},{"i":9157,"cid":"23IB0031","pid":"P00732043VS","t":"Construction of Flood Control Structure, Barangay 1 Poblacion, Llorente, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"LLORENTE (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"ST. ROCH CONSTRUCTION","c":19799999.97,"abc":19799998.84,"fy":"2023","sd":"02/16/2023","cd":"2023-07-18","lat":11.60504,"lon":125.438101,"sm":801,"fm":801,"tm":801,"am":374,"md":19.73,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1 Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":44,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.93,"value":19.73,"text":"The pin is 19.7 km outside Llorente, Eastern Samar, the nearest municipality the record claims. It falls in City of Borongan, Eastern Samar.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":254},{"i":9158,"cid":"22IB0093","pid":"P00620183VS","t":"Rehabilitation of Drainage System at Brgy. Sabang South, Borongan City, Eastern Samar","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"CITY OF BORONGAN (CAPITAL) (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"TUBIGAN BUILDERS","c":4896620.89,"abc":4949996.39,"fy":"2022","sd":"04/07/2022","cd":"2022-07-16","lat":11.620556,"lon":125.438889,"sm":374,"fm":374,"tm":374,"am":374,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sabang South","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7271},{"i":9159,"cid":"22IB0032","pid":"P00620175VS","t":"Construction of Brgy Nadacpan Flood Control, Brgy. Nadacpan, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"J.A. DEVELOPERS AND ENGINEERS","c":19599967.51,"abc":19599999.37,"fy":"2022","sd":"02/13/2022","cd":"2022-07-04","lat":12.18621,"lon":125.440608,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Nadacpan Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7272},{"i":9160,"cid":"22IB0023","pid":"P00620181VS","t":"Rehabilitation/Improvement of Flood Control Structure along Can-obing River, Brgy. Bato, Borongan City, Eastern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"CITY OF BORONGAN (CAPITAL) (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES","c":48999992.98,"abc":48999999.89,"fy":"2022","sd":"03/17/2022","cd":"2022-07-22","lat":11.598315,"lon":125.442116,"sm":374,"fm":374,"tm":374,"am":374,"md":0.0,"ls":"inside","ww":"Can-obing","wn":"Can-obing","wd":0.26,"wp":[11.59662,125.44053],"wst":"matched","br":"Bato","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7273},{"i":9161,"cid":"23IB0063","pid":"P00733753VS","t":"Construction of flood control at Brgy. Dampigan, Dolores E. Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"DOLORES (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":14849999.91,"abc":14849992.73,"fy":"2023","sd":"04/18/2023","cd":"2023-11-13","lat":12.031944,"lon":125.442778,"sm":524,"fm":524,"tm":null,"am":524,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dampigan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7274},{"i":9162,"cid":"22LD0029","pid":"P00630607MN","t":"Construction of Revetment along Coronon River, Santa Cruz, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SANTA CRUZ (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-31","lat":6.878312,"lon":125.451797,"sm":1377,"fm":1377,"tm":1377,"am":1377,"md":0.0,"ls":"inside","ww":"Coronon","wn":"Coronon River","wd":0.01,"wp":[6.87827,125.45177],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7275},{"i":9163,"cid":"23LH0012","pid":"P00721384MN","t":"Construction of Cut-Off Wall at Calinan Creek, Sta. 0 + 000 - Sta. 0 + 250, Barangay Calinan Poblacion, Calinan District, Davao City","w":"Construction of Cutoff Channel","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":24301419.01,"abc":24500000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-09-09","lat":7.211059,"lon":125.451798,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Calinan","wn":"Calinan Creek","wd":1.58,"wp":[7.19705,125.45469],"wst":"matched","br":"Calinan Poblacion","len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7276},{"i":9164,"cid":"22IB0026","pid":"P00620176VS","t":"Construction of Brgy. Cabong Flood Control, Brgy. Cabong, Borongan City, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"CITY OF BORONGAN (CAPITAL) (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES","c":48999993.8,"abc":49000000.71,"fy":"2022","sd":"02/13/2022","cd":"2022-12-02","lat":11.585833,"lon":125.454722,"sm":374,"fm":374,"tm":374,"am":374,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabong Flood Control","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7277},{"i":9165,"cid":"24LH0015","pid":"P00820296MN","t":"Construction of Concrete Revetment along Talomo River (Balite Section), Calinan District, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALFREGO BUILDERS & SUPPLY","c":86513783.34,"abc":86850000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-06","lat":7.178131,"lon":125.4599,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.12,"wp":[7.17818,125.46101],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7278},{"i":9166,"cid":"22IB0067","pid":"P00620326VS","t":"Rehabilitation/Improvement of Flood Control along Suribao River, Brgy. Camada, Borongan City, Eastern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"CITY OF BORONGAN (CAPITAL) (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"J.A. DEVELOPERS AND ENGINEERS","c":19599983.4,"abc":19600000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-08-04","lat":11.541145,"lon":125.460365,"sm":374,"fm":374,"tm":374,"am":374,"md":0.0,"ls":"inside","ww":"Suribao","wn":"Suribao River","wd":0.2,"wp":[11.53965,125.46137],"wst":"matched","br":"Camada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7279},{"i":9167,"cid":"23LH0015","pid":"P00721496MN","t":"Construction of Concrete Revetment along Talomo River, Balite Section, Sta. 0 + 000 - Sta. 0 + 500, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALFREGO BUILDERS & SUPPLY","c":47696875.08,"abc":49000000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-08-21","lat":7.176266,"lon":125.462135,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.0,"wp":[7.1763,125.46216],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7280},{"i":9168,"cid":"22LE0030","pid":"P00620058MN","t":"Construction of Concrete Revetment, Demoloc, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-02","lat":6.367545,"lon":125.465122,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7281},{"i":9169,"cid":"22LE0031","pid":"P00620059MN","t":"Construction of Concrete Revetment, Fatima, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-02","lat":6.367373,"lon":125.465139,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7282},{"i":9170,"cid":"22LE0032","pid":"P00620060MN","t":"Construction of Concrete Revetment, Kilalag, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-02","lat":6.367581,"lon":125.465231,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7283},{"i":9171,"cid":"23LE0018","pid":"P00721282MN","t":"Construction of Concrete Revetment (RC Cut-off Wall), Pongpong Flood Control, Sta. Maria, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"SANTA MARIA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":77189371.31,"abc":77200000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-10-04","lat":6.494794,"lon":125.466233,"sm":1397,"fm":1397,"tm":1397,"am":1397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7284},{"i":9172,"cid":"22LE0036","pid":"P00620064MN","t":"Construction of Concrete Revetment, Pongpong, Sta. 0+000 - Sta. 2+000, Sta. Maria, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"SANTA MARIA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-02","lat":6.476361,"lon":125.467281,"sm":1397,"fm":1397,"tm":1397,"am":1397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7285},{"i":9173,"cid":"24LH0016","pid":"P00820410MN","t":"Construction of Concrete Revetment along Talomo River (Los Amigos Section), Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALFREGO BUILDERS & SUPPLY","c":48866414.37,"abc":49000000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-10-02","lat":7.154383,"lon":125.470721,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.08,"wp":[7.15409,125.47138],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7286},{"i":9174,"cid":"22LH0010","pid":"P00620065MN","t":"Construction of Cut-Off Wall at Calinan Creek, Sta. 0+000 - Sta. 1+450, Brgy. Calinan Poblacion, Calinan District, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":50632025.64,"abc":50807250.0,"fy":"2022","sd":"03/08/2022","cd":"2023-05-10","lat":7.178046,"lon":125.47073,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Calinan","wn":"Calinan Creek","wd":0.01,"wp":[7.1781,125.47074],"wst":"matched","br":"Calinan Poblacion","len":1450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7287},{"i":9175,"cid":"22LH0015","pid":"P00630503MN","t":"Construction of Concrete Revetment along Talomo River, Calinan District, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":93749272.96,"abc":96500000.0,"fy":"2022","sd":"03/08/2022","cd":"2023-02-03","lat":7.166633,"lon":125.470915,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.1665,125.47099],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7288},{"i":9176,"cid":"22NG0029","pid":"P00630649MN","t":"Construction of Riverbank in Barangay Tagbuyawan, Mainit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MAINIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":48997260.67,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2023-01-13","lat":9.48503,"lon":125.47439,"sm":881,"fm":881,"tm":881,"am":881,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tagbuyawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7289},{"i":9177,"cid":"22NG0015","pid":"P00630637MN","t":"Construction of Flood Control Structure along Mayag River, Mainit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MAINIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":48999839.78,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-26","lat":9.55394,"lon":125.47586,"sm":881,"fm":881,"tm":881,"am":881,"md":0.0,"ls":"inside","ww":"Mayag","wn":"Mayag River","wd":0.04,"wp":[9.55424,125.47563],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7290},{"i":9178,"cid":"23LE0035","pid":"P00721578MN","t":"Construction of Flood Control, Barangay Poblacion, Sta. Maria, Davao Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"SANTA MARIA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"SCP CONSTRUCTION","c":96489010.67,"abc":96500000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-03-15","lat":6.537691,"lon":125.478551,"sm":1397,"fm":1397,"tm":1397,"am":1397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7291},{"i":9179,"cid":"24NG0002","pid":"P00820369MN","t":"Construction of Flood Control Structure along Surigao River, Sitio Kabalawan, Barangay Rizal, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":96499986.9,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-11-28","lat":9.778365,"lon":125.479165,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.02,"wp":[9.77823,125.4791],"wst":"matched","br":"Rizal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7292},{"i":9180,"cid":"23N00109","pid":"P00721330MN","t":"Construction of Drainage System along Butuan City-Cagayan de Oro-Iligan Road, Butuan City Airport to Libertad Bridge (Both Sides) including sidewalk, curb and gutter, Butuan City, Agusan Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":289499999.8,"abc":289500000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-10-18","lat":8.946433,"lon":125.4794,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7293},{"i":9181,"cid":"23LH0016","pid":"P00721497MN","t":"Construction of Concrete Revetment along Talomo River, Los Amigos Section, Sta. 0 + 000 - Sta. 0 + 500, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALFREGO BUILDERS & SUPPLY","c":47647054.64,"abc":49000000.0,"fy":"2023","sd":"03/09/2023","cd":"2023-10-06","lat":7.134234,"lon":125.479897,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.01,"wp":[7.13419,125.48],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7294},{"i":9182,"cid":"22L00034","pid":"P00630516MN","t":"Construction of Flood Mitigation Structure, Brgy. Angalan,Tugbok District, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":95525289.12,"abc":115800000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-05-15","lat":7.122164,"lon":125.47994,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Angalan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7295},{"i":9183,"cid":"23NG0042","pid":"P00721588MN","t":"Construction of Revetment along Surigao River, Togbongon Section, Surigao City, Surigao del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96472570.51,"abc":96500000.0,"fy":"2023","sd":"04/18/2023","cd":"2024-04-14","lat":9.768875,"lon":125.4801,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.03,"wp":[9.76903,125.48033],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7296},{"i":9184,"cid":"24NG0019","pid":"P00820114MN","t":"Construction of Flood Control Structure along Kinabutan River, Villa Corito-Purok Kalipayan, Barangay Washington, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":96499949.84,"abc":96500000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-12-09","lat":9.783068,"lon":125.48056,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Kinabutan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Washington","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7297},{"i":9185,"cid":"23NG0041","pid":"P00721587MN","t":"Construction of Revetment along Surigao River, Luna Section, Surigao City, Surigao del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96494216.75,"abc":96500000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-12-19","lat":9.767755,"lon":125.480839,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.04,"wp":[9.76799,125.48056],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7298},{"i":9186,"cid":"24ND0078","pid":"P00820929MN","t":"Construction / Maintenance of Flood Mitigation Structures and Drainage System-Flood Mitigation Structures at Masao Rivermouth and Construction of Cut-off Channel at Masao River, Left Side Bank Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":98400007.99,"abc":98400007.99,"fy":"2024","sd":"05/14/2024","cd":"2025-02-20","lat":8.99778,"lon":125.48117,"sm":268,"fm":268,"tm":null,"am":268,"md":0.0,"ls":"inside","ww":"Cut-off","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7299},{"i":9187,"cid":"23N00181","pid":"P00721652MN","t":"Construction of Revetment along Surigao River, Serna Section, Surigao City, Surigao del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"SANTECH  BUILDERS CORPORATION / GICAR CONSTRUCTION, INC.","c":192999869.6,"abc":193000000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-07-08","lat":9.741355,"lon":125.482941,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.04,"wp":[9.74171,125.48314],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7300},{"i":9188,"cid":"24N00148","pid":"P00821205MN","t":"Construction of Revetment along Surigao River, Poctoy Section, Phase 1, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":110974983.1,"abc":110975000.0,"fy":"2024","sd":"07/12/2024","cd":"2025-02-27","lat":9.7417,"lon":125.48302,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.01,"wp":[9.74176,125.48305],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7301},{"i":9189,"cid":"22LH0016","pid":"P00630512MN","t":"Construction of Flood Control Structure at Lipadas River, Lizada Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":93355006.08,"abc":96500000.0,"fy":"2022","sd":"03/08/2022","cd":"2023-03-04","lat":7.00311,"lon":125.484758,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Lipadas","wn":"Lipadas River","wd":0.02,"wp":[7.00311,125.48494],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7302},{"i":9190,"cid":"23LH0011","pid":"P00721274MN","t":"Construction of Concrete Revetment along Mintal Creek, Sitio Basak Mintal Section, Sta. 0 + 000 - Sta. 0 + 750, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"EDCL CONSTRUCTION AND SUPPLY","c":71928738.54,"abc":72375000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-12-17","lat":7.087661,"lon":125.486343,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Mintal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[9191],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 140,438,168.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1064},{"i":9191,"cid":"24LH0028","pid":"P00820916MN","t":"Construction of Concrete Revetment along Mintal Creek, Sitio Basak (Mintal Section), Sta. 0 + 000 - Sta. 0 + 750, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"EDCL CONSTRUCTION AND SUPPLY","c":68509429.13,"abc":68515000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-09","lat":7.087661,"lon":125.486343,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Mintal","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[9190],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 140,438,168.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1065},{"i":9192,"cid":"22LE0033","pid":"P00620061MN","t":"Construction of Concrete Revetment, Kumasie, Sta. 0+000 - Sta. 2+000, Sta. Maria, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"SANTA MARIA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96489997.96,"abc":96500000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-10-29","lat":6.535014,"lon":125.486457,"sm":1397,"fm":1397,"tm":1397,"am":1397,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7303},{"i":9193,"cid":"22LH0019","pid":"P00620263MN","t":"Construction of Concrete Revetment along Lipadas River, Alambre - Lobogan Section, Sta. 0+000 - Sta. 0+500, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":47532139.96,"abc":49000000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-10-05","lat":7.04312,"lon":125.486815,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Lipadas","wn":"Lipadas River","wd":0.0,"wp":[7.04311,125.48681],"wst":"matched","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7304},{"i":9194,"cid":"24N00130","pid":"P00835820MN","t":"Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream), Package 2, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":192999989.2,"abc":193000000.0,"fy":"2024","sd":"04/10/2024","cd":"2025-02-28","lat":8.93187,"lon":125.48716,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7305},{"i":9195,"cid":"23N00112","pid":"P00721336MN","t":"Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":144749992.5,"abc":144750000.0,"fy":"2023","sd":"04/18/2023","cd":"2024-01-31","lat":8.98405,"lon":125.48749,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7306},{"i":9196,"cid":"24LH0012","pid":"P00820292MN","t":"Construction of Concrete Revetment along Lipadas River, Lizada - Sirawan Section - Sta. 0 + 000 - Sta. 0 + 750, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67547960.92,"abc":67550000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-07","lat":6.987462,"lon":125.48932,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Lipadas","wn":"Lipadas River","wd":0.01,"wp":[6.98743,125.48941],"wst":"matched","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7307},{"i":9197,"cid":"24LH0013","pid":"P00820291MN","t":"Construction of Concrete Revetment along Lipadas River, Crossing Bayabas Section - Sta. 0 + 000 - Sta. 0 + 750, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"EDCL CONSTRUCTION AND SUPPLY","c":67779661.61,"abc":67779670.0,"fy":"2024","sd":"03/05/2024","cd":"2024-11-08","lat":7.015323,"lon":125.48951,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Lipadas","wn":"Lipadas River","wd":0.0,"wp":[7.01532,125.48951],"wst":"matched","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7308},{"i":9198,"cid":"22LH0014","pid":"P00630525MN","t":"Construction of Revetment along Talomo River (Angalan-Riverside-Calinan Section), Sta. 1+000 - Sta. 2+120, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"TKS BUILDERS & SUPPLIES / LEDCORE CONSTRUCTION AND DEVELOPMENT CORP,","c":86576807.55,"abc":86850000.0,"fy":"2022","sd":"03/08/2022","cd":"2022-12-26","lat":7.108774,"lon":125.490329,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Talomo","wn":"Talomo River","wd":0.02,"wp":[7.10895,125.49043],"wst":"matched","br":null,"len":1120.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7309},{"i":9199,"cid":"24NG0048","pid":"P00835891MN","t":"Construction of Tagbayani Flood Mitigation Structure, Barangay Tagbayani, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SISON (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":29104565.61,"abc":29400000.0,"fy":"2024","sd":"04/30/2024","cd":"2024-12-07","lat":9.650463,"lon":125.491224,"sm":1469,"fm":1469,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tagbayani","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7310},{"i":9200,"cid":"22LH0163","pid":"P00630600MN","t":"Construction of Drainage Structure along Angalan Creek, Tugbok District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"AIMEK CONSTRUCTION AND SUPPLY","c":19299981.53,"abc":19300000.0,"fy":"2022","sd":"07/27/2022","cd":"2023-02-16","lat":7.105458,"lon":125.491862,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Angalan","wn":"Angalan Creek","wd":1.79,"wp":[7.11892,125.48287],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7311},{"i":9201,"cid":"23LE0056","pid":"P00733995MN","t":"Construction of Concrete Revetment Barangay Pinalpalan, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":96488648.31,"abc":96500000.0,"fy":"2023","sd":"05/05/2023","cd":"2024-02-20","lat":6.408479,"lon":125.492946,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinalpalan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7312},{"i":9202,"cid":"24N00140","pid":"P00835857MN","t":"Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 2, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":192999520.5,"abc":193000000.0,"fy":"2024","sd":"05/13/2024","cd":"2025-02-28","lat":8.94835,"lon":125.49474,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7313},{"i":9203,"cid":"22LH0119","pid":"P00630595MN","t":"Construction of Main Canal from Purok Vision, Purok Dacucao, Purok Lawis, Barangay Lizada, Toril District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY","c":9505381.79,"abc":9800000.0,"fy":"2022","sd":"08/03/2022","cd":"2023-07-21","lat":6.99498,"lon":125.495581,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lizada","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7314},{"i":9204,"cid":"22NG0054","pid":"P00634125MN","t":"Construction of Flood Mitigation Structure along Surigao River, Brgy. Quezon, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ED1SON DEVELOPMENT & CONSTRUCTION INC. / TWENTYSIX CONSTRUCTION INC.","c":48503241.04,"abc":49500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-04-30","lat":9.725269,"lon":125.498017,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.02,"wp":[9.72543,125.498],"wst":"matched","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7315},{"i":9205,"cid":"22LH0135","pid":"P00631096MN","t":"Construction of Drainage Structure along Mintal - Tacunan Road, Tugbok District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"LOTRIM CONSTRUCTION, INC.","c":29595077.47,"abc":29700000.0,"fy":"2022","sd":"07/26/2022","cd":"2023-04-03","lat":7.108816,"lon":125.498799,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7316},{"i":9206,"cid":"24N00134","pid":"P00835856MN","t":"Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 1, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":192998943.6,"abc":193000000.0,"fy":"2024","sd":"05/03/2024","cd":"2025-02-28","lat":8.94314,"lon":125.49988,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7317},{"i":9207,"cid":"22NG0014","pid":"P00630545MN","t":"Construction of Flood Mitigation Structure along Surigao River, Barangay Quezon, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"SANTECH  BUILDERS CORPORATION / GICAR CONSTRUCTION, INC.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-02-26","lat":9.72514,"lon":125.5004,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.05,"wp":[9.72468,125.50047],"wst":"matched","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7318},{"i":9208,"cid":"22LB0367","pid":"P00633919MN","t":"Construction of Drainage System at Purok 1, Barangay Baliok, Talomo District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"06/06/2022","cd":"2022-11-18","lat":7.042688,"lon":125.501238,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baliok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7319},{"i":9209,"cid":"22LB0377","pid":"P00633929MN","t":"Rehabilitation of Drainage System at Susana Homes Subdivision Section, Barangay Baliok, Talomo District, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"H-ROYAL CONSTRUCTION","c":9652199.8,"abc":9800000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-11-06","lat":7.04792,"lon":125.501754,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baliok","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7320},{"i":9210,"cid":"22NG0009","pid":"P00630546MN","t":"Construction of Flood Mitigation Structure along Surigao River, Barangay Trinidad, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":86849199.88,"abc":86850000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-03-15","lat":9.703031,"lon":125.5035,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.02,"wp":[9.70318,125.50335],"wst":"matched","br":"Trinidad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7321},{"i":9211,"cid":"23NG0023","pid":"P00721489MN","t":"Construction of Flood Mitigation Structure along Surigao River, Barangay Quezon, Surigao City, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SURIGAO CITY (CAPITAL) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":96499997.47,"abc":96500000.0,"fy":"2023","sd":"02/27/2023","cd":"2024-03-04","lat":9.71827,"lon":125.504263,"sm":1497,"fm":1497,"tm":1497,"am":1497,"md":0.0,"ls":"inside","ww":"Surigao","wn":"Surigao River","wd":0.09,"wp":[9.71902,125.50445],"wst":"matched","br":"Quezon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7322},{"i":9212,"cid":"22ND0030","pid":"P00630551MN","t":"Construction of Main Drainage Canal, NRJ BCIR to Provincial Hospital to LADP, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":67343386.21,"abc":67343386.32,"fy":"2022","sd":"03/29/2022","cd":"2023-06-21","lat":8.943961,"lon":125.50534,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7323},{"i":9213,"cid":"24LH0017","pid":"P00820290MN","t":"Construction of Concrete Revetment along Davao River (Pangyan Section), Calinan District, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ARCINUE COMM'L CORPORATION","c":86845020.11,"abc":86850000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-12-13","lat":7.229228,"lon":125.50758,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.22912,125.50788],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7324},{"i":9214,"cid":"23NA0027","pid":"P00721590MN","t":"Construction of Flood Mitigation Structure at Lower Agusan River, Magallanes Pagatpatan Section, Magallanes, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"MAGALLANES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":48249999.19,"abc":48250000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-11-03","lat":9.029545,"lon":125.511797,"sm":863,"fm":863,"tm":863,"am":863,"md":0.0,"ls":"inside","ww":"Lower Agusan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7325},{"i":9215,"cid":"22IB0085","pid":"P00630675VS","t":"Construction of Drainage at Barangay Gigoso, Giporlos, Eastern Samar","w":"Construction of Drainage Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"GIPORLOS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"BORONGAN MBC MERCHANDISING AND CONSTRUCTION","c":4949999.85,"abc":4949981.91,"fy":"2022","sd":"04/07/2022","cd":"2022-07-21","lat":11.087791,"lon":125.512108,"sm":586,"fm":586,"tm":586,"am":586,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gigoso","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7326},{"i":9216,"cid":"22ND0031","pid":"P00630550MN","t":"Construction of Main Drainage Canal, NRJ BCIR to LADP Creek, Employees Village, Butuan City, Agusan del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":86589691.07,"abc":86589691.07,"fy":"2022","sd":"02/28/2022","cd":"2022-12-23","lat":8.9439,"lon":125.51255,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"LADP","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7327},{"i":9217,"cid":"23LH0014","pid":"P00721433MN","t":"Construction of Concrete Revetment along Davao River, Pangyan Section, Sta. 0 + 000 - Sta. 1 + 000, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ABU CONSTRUCTION / ALFREGO BUILDERS & SUPPLY","c":96498666.24,"abc":96500000.0,"fy":"2023","sd":"03/09/2023","cd":"2024-01-04","lat":7.212526,"lon":125.513238,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.03,"wp":[7.21278,125.51341],"wst":"matched","br":null,"len":1000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7328},{"i":9218,"cid":"22NG0010","pid":"P00620255MN","t":"Construction of Flood Control Structure, Mainit Lakewall, Mainit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"MAINIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":54529499.96,"abc":54560135.0,"fy":"2022","sd":"03/11/2022","cd":"2022-12-13","lat":9.53586,"lon":125.51356,"sm":881,"fm":881,"tm":881,"am":881,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7329},{"i":9219,"cid":"22LH0020","pid":"P00630502MN","t":"Construction of Concrete Revetment along Davao River, Pangyan, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96498186.61,"abc":96500000.0,"fy":"2022","sd":"03/08/2022","cd":"2023-01-03","lat":7.212537,"lon":125.514212,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.21246,125.51389],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7330},{"i":9220,"cid":"21LB0302","pid":"P00550553MN","t":"Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2021","sd":"11/18/2021","cd":"2022-07-29","lat":7.057827,"lon":125.514861,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7331},{"i":9221,"cid":"23N00110","pid":"P00721331MN","t":"Construction of Drainage System along Butuan City-Cagayan de Oro-Iligan Road, Libertad Bridge to Robinsons (Both Sides) including sidewalk, curb and gutter, Butuan City, Agusan Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":289499996.4,"abc":289500000.0,"fy":"2023","sd":"07/28/2023","cd":"2024-10-18","lat":8.942533,"lon":125.515217,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7332},{"i":9222,"cid":"22IB0086","pid":"P00620059VS","t":"Construction of Flood Control at Brgy. 7 to Brgy. San Vicente Protecting National Road and Bridges, Quinapondan, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"QUINAPONDAN (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES / JGO BUILDERS","c":57900000.0,"abc":58800000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-02-09","lat":11.153573,"lon":125.515761,"sm":1193,"fm":1193,"tm":1193,"am":1193,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"7","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7333},{"i":9223,"cid":"22NG0024","pid":"P00630544MN","t":"Construction of Flood Mitigation Structure along Mabuhay River, Barangay Mabuhay, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SISON (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":86849971.99,"abc":86850000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-04-23","lat":9.68061,"lon":125.51795,"sm":1469,"fm":1469,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":"Mabuhay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7334},{"i":9224,"cid":"22NA0027","pid":"P00620351MN","t":"Construction of Flood Mitigation Structure at Lower Agusan River, Magallanes-Pagatpatan Section, Magallanes, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"MAGALLANES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":48999998.08,"abc":49000000.0,"fy":"2022","sd":"04/10/2022","cd":"2022-10-26","lat":9.016529,"lon":125.518747,"sm":863,"fm":863,"tm":863,"am":863,"md":0.0,"ls":"inside","ww":"Lower Agusan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7335},{"i":9225,"cid":"23LE0036","pid":"P00721579MN","t":"Construction of Macol Flood Control Structure, Malita, Davao Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96475000.01,"abc":96500000.0,"fy":"2023","sd":"05/05/2023","cd":"2024-02-20","lat":6.345947,"lon":125.519097,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7336},{"i":9226,"cid":"21LB0297","pid":"P00550521MN","t":"Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"A.Y.U. ENGINEERING & CONSTRUCTION","c":56738426.26,"abc":57900000.0,"fy":"2021","sd":"12/05/2021","cd":"2023-08-15","lat":7.048832,"lon":125.520676,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7337},{"i":9227,"cid":"22LB0365","pid":"P00633917MN","t":"Construction of Drainage System at Department of Agrarian Reform, Catalunan Pequeño, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"PRIMECON BUILDERS, INC.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-03-07","lat":7.071735,"lon":125.52193,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7338},{"i":9228,"cid":"22LB0356","pid":"P00633908MN","t":"Construction of Drainage at Barangay Catalunan Pequeño, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-04-05","lat":7.076596,"lon":125.522072,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catalunan Pequeño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7339},{"i":9229,"cid":"23N00133","pid":"P00721490MN","t":"Construction of Flood Mitigation Structure along Hinagasan River, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SISON (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":115799955.5,"abc":115800000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-03-21","lat":9.67981,"lon":125.523,"sm":1469,"fm":1469,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":"Hinagasan","wn":"Hinagasan River","wd":0.1,"wp":[9.67892,125.52321],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7340},{"i":9230,"cid":"22LB0372","pid":"P00633924MN","t":"Construction of Flood Mitigation Structure at Purok 15, Kabataan Center Village, Barangay Bago Gallera, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D","c":13719527.94,"abc":13720000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-11-09","lat":7.05674,"lon":125.523962,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bago Gallera","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7341},{"i":9231,"cid":"21N00097","pid":"P00522332MN","t":"Construction of Flood Mitigating Structure along Hinagasan River, Barangay Mabuhay, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"Sison","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":109044995.1,"abc":109045000.0,"fy":"2021","sd":"04/26/2021","cd":"2022-10-02","lat":9.678765,"lon":125.524762,"sm":1469,"fm":null,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":"Hinagasan","wn":"Hinagasan River","wd":0.01,"wp":[9.67886,125.52486],"wst":"matched","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7342},{"i":9232,"cid":"23N00186","pid":"P00721327MN","t":"Rehabilitation of Dike along Mandakpan-Bonbon Channel, Downstream Section, Butuan City, Agusan Del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":144749999.7,"abc":144750000.0,"fy":"2023","sd":"10/06/2023","cd":"2024-09-16","lat":8.927516,"lon":125.525141,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Mandakpan-Bonbon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7343},{"i":9233,"cid":"23N00164","pid":"P00721653MN","t":"Construction of Bank Protection along Agusan River, Agusan Pequeño Section, Package 2, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":53074985.79,"abc":53075000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-08-14","lat":8.976649,"lon":125.525245,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.31,"wp":[8.97801,125.52774],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7344},{"i":9234,"cid":"22NG0017","pid":"P00630647MN","t":"Construction of River Control Structure, Sison, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SISON (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":48467977.5,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-11-30","lat":9.66187,"lon":125.52567,"sm":1469,"fm":1469,"tm":1469,"am":1469,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7345},{"i":9235,"cid":"22LB0351","pid":"P00633896MN","t":"Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Wellspring Village Section, Left Bank, Talomo River, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC. / GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-08-20","lat":7.07476,"lon":125.52568,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Catalunan Pequeño","wn":"Catalunan Pequeño Creek","wd":0.37,"wp":[7.0718,125.52416],"wst":"matched","br":null,"len":null,"ph":null,"dup":[8999],"run":[9038,9039,8999],"cl":[],"L":"field","s":61,"sig":[{"code":"shared_pin","group":"risk","strength":0.45,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year, one with an identical contract amount. Combined value at this pin: PHP 193,000,000.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."},{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LB0349 to 22LB0352) cover the same site, together worth PHP 366,700,000.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":21},{"i":9236,"cid":"23MC0023","pid":"P00721505MN","t":"Construction of Flood Control Dike along Kabacan River L/S, Barangay Binay, Magpet, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-11-20","lat":7.12963,"lon":125.083943,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.12,"wp":[7.12864,125.08346],"wst":"matched","br":"Binay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7346},{"i":9237,"cid":"23NF0043","pid":"P00734420MN","t":"Construction of Shore Protection,Brgy. Pamosaingan,Socorro, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SOCORRO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":49399902.5,"abc":49500000.0,"fy":"2023","sd":"07/13/2023","cd":"2024-04-14","lat":9.651782,"lon":125.921238,"sm":1471,"fm":1471,"tm":1471,"am":1471,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pamosaingan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7347},{"i":9238,"cid":"22LA0083","pid":"P00620264MN","t":"Construction of Revetment along Agusan River (Downstream), Sta. 2+400 - Sta. 2+419.318 (LS), Sta. 2+431.465 - Sta. 2+930.00 (LS), Sta. 3+098.557 - Sta. 3+246.896 (LS), Sta. 3+266.034 - Sta. 3+783.342 (LS), Brgy. Cambagang, Maragusan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MARAGUSAN (SAN MARIANO) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":48999342.16,"abc":48999979.44,"fy":"2022","sd":"04/04/2022","cd":"2022-12-08","lat":7.381068,"lon":126.13861,"sm":931,"fm":931,"tm":931,"am":931,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":27.78,"wp":[7.63065,126.11295],"wst":"matched","br":"Cambagang","len":1183.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7348},{"i":9239,"cid":"21MC0073","pid":"P00522365MN","t":"Construction of Malasila River Flood Control L/S , Brgy. Sta. Filomina and Brgy. Poblacion Section, Makilala, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"Makilala","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":49000000.0,"abc":48999212.65,"fy":"2021","sd":"03/07/2022","cd":"2023-02-02","lat":6.945359,"lon":125.088915,"sm":885,"fm":null,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Malasila","wn":"Malasila River","wd":0.01,"wp":[6.94526,125.08895],"wst":"matched","br":"Sta. Filomina","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7349},{"i":9240,"cid":"22NB0010","pid":"P00620296MN","t":"Construction of Maug Flood Control Structure along Riverbank of Maug Bridge Phase III (Downstream), Sta. 0+000.00 - Sta. 0+320.00 R/S, Prosperidad, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":45079964.27,"abc":45080000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-03-23","lat":8.638879,"lon":125.926366,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":320.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7350},{"i":9241,"cid":"23NE0065","pid":"P00734037MN","t":"Construction of Shore Protection/Seawall at Brgy. Matingbe, San Jose, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"SAN JOSE (CAPITAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"NAHARO BUILDERS, INC.","c":29388645.37,"abc":29400000.0,"fy":"2023","sd":"05/02/2023","cd":"2024-11-08","lat":10.003137,"lon":125.575156,"sm":1304,"fm":1304,"tm":1304,"am":1304,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matingbe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7351},{"i":9242,"cid":"22LB0196","pid":"P00634967MN","t":"Construction of Drainage Canal, Purok 1, Barangay Bunawan, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"LPS CONSTRUCTION GROUP, INC.","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-11-13","lat":7.231507,"lon":125.644678,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7352},{"i":9243,"cid":"23KA0076","pid":"P00733989MN","t":"Construction of Flood Mitigation Structure, Sitio Panamucan, Brgy. San Jose, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"08/31/2023","cd":"2024-03-25","lat":8.083632,"lon":125.188518,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Jose","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7353},{"i":9244,"cid":"24NB0015","pid":"P00820364MN","t":"Construction of Bank Protection along Agusan River (Poblacion-Esperanza Section) Esperanza, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":77199943.13,"abc":77200000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-12-18","lat":8.673394,"lon":125.644714,"sm":553,"fm":553,"tm":null,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.18,"wp":[8.6728,125.64315],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7354},{"i":9245,"cid":"22IK0018","pid":"P00620217VS","t":"Construction of Flood Control Protection Works Structure, Iba Bridge, Brgy. Iba, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)","c":38024021.38,"abc":39200000.0,"fy":"2022","sd":"02/13/2022","cd":"2023-01-14","lat":11.29437,"lon":125.092082,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Iba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7355},{"i":9246,"cid":"22LB0234","pid":"P00631100MN","t":"Construction of Drainage System, Barangay Mandug, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"LLM UNIFIED BUILDERS & TRADING CORP. (FORMERLY:LLM CONCRETE PRODUCTS)","c":5445000.0,"abc":5445000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-04","lat":7.160499,"lon":125.575348,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mandug","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7356},{"i":9247,"cid":"22LA0122","pid":"P00634136MN","t":"Revetment of Flood Control, Purok 1, New Sibunga, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":6859984.22,"abc":6859998.76,"fy":"2022","sd":"03/29/2022","cd":"2022-07-20","lat":7.562241,"lon":125.929686,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7357},{"i":9248,"cid":"23LB0037","pid":"P00721292MN","t":"Construction of Revetment along Bunawan River, Sta. 0 + 000 - Sta. 0 + 426, East Side, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"02/20/2023","cd":"2023-10-27","lat":7.2578,"lon":125.6456,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Bunawan","wn":"Bunawan River","wd":0.93,"wp":[7.25216,125.63939],"wst":"matched","br":null,"len":426.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7358},{"i":9249,"cid":"23LI0091","pid":"P00721617MN","t":"Construction of Revetment along Kalamokan Creek, San Roque to Andap, New Bataan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NEW BATAAN (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":41642463.58,"abc":49000000.0,"fy":"2023","sd":"05/26/2023","cd":"2023-12-02","lat":7.571668,"lon":126.140798,"sm":1019,"fm":1019,"tm":1019,"am":1019,"md":0.0,"ls":"inside","ww":"Kalamokan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7359},{"i":9250,"cid":"22NE0056","pid":"P00630559MN","t":"Construction of San Juan-Sta. Cruz-Santiago Shore Protection (Seawall), Loreto, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"LORETO (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"JMT CONSTRUCTION","c":95534810.12,"abc":96500000.0,"fy":"2022","sd":"03/17/2022","cd":"2023-11-16","lat":10.36096,"lon":125.57595,"sm":812,"fm":812,"tm":812,"am":812,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7360},{"i":9251,"cid":"23K00140","pid":"P00721412MN","t":"Construction of Flood Mitigation Structure along Pulangi River, Package 1, San Isidro, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":183887563.2,"abc":188000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-04-28","lat":7.965738,"lon":125.193842,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.08,"wp":[7.96636,125.19423],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7361},{"i":9252,"cid":"24LA0130","pid":"P00835879MN","t":"Construction of Revetment along New Sibunga Creek, New Sibunga, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"TAGUM BUILDERS CONTRACTORS CORP. (FORMERLY: TAGUM","c":48999885.55,"abc":49000000.0,"fy":"2024","sd":"09/25/2024","cd":"2025-02-28","lat":7.56183,"lon":125.93121,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":"New Sibunga","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7362},{"i":9253,"cid":"21K00259","pid":"P00522341MN","t":"Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Downstream of New Batangan Bridge, Barangay Poblacion Section, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"City of Valencia","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":45835692.71,"abc":48250000.0,"fy":"2021","sd":"03/25/2022","cd":"2023-08-27","lat":7.898765,"lon":125.093907,"sm":435,"fm":null,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Mindanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7363},{"i":9254,"cid":"22NG0055","pid":"P00634152MN","t":"Construction of Magtiaco River Flood Control along Magtiaco River, Barangay San Pedro, Alegria, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"ALEGRIA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":9899347.33,"abc":9900000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-12-09","lat":9.48378,"lon":125.57808,"sm":30,"fm":30,"tm":30,"am":30,"md":0.0,"ls":"inside","ww":"Magtiaco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7364},{"i":9255,"cid":"23LI0090","pid":"P00721618MN","t":"Construction of Revetment along Marangig River leading to Agusan River, New Albay, Maragusan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MARAGUSAN (SAN MARIANO) (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":48997610.2,"abc":49000000.0,"fy":"2023","sd":"05/26/2023","cd":"2024-04-22","lat":7.33666,"lon":126.141779,"sm":931,"fm":931,"tm":931,"am":931,"md":0.0,"ls":"inside","ww":"Marangig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7365},{"i":9256,"cid":"21LB0309","pid":"P00522191MN","t":"Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Bunawan, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":24500000.0,"abc":24500000.0,"fy":"2021","sd":"04/13/2022","cd":"2023-03-24","lat":7.257163,"lon":125.64718,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bunawan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7366},{"i":9257,"cid":"22LA0043","pid":"P00620169MN","t":"Construction of Revetment along Linda Creek, Sta. 3+000 - Sta. 3+430 (RS), Sta. 1+500 - Sta. 2+500 (LS), Sta. 2+000 - Sta. 2+520 (RS), Brgy. Linda, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"TAGUM BUILDERS CONTRACTORS CORP. (FORMERLY: TAGUM","c":48999953.58,"abc":48999970.51,"fy":"2022","sd":"02/15/2022","cd":"2022-11-08","lat":7.574438,"lon":125.935011,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":"Linda","wn":"Linda Creek","wd":0.0,"wp":[7.57442,125.93502],"wst":"matched","br":"Linda","len":1950.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7367},{"i":9258,"cid":"22KB0072","pid":"P00630498MN","t":"Construction of Revetment, Downstream and Upstream of Rawari Bridge (B01384MN) along Bukidnon - Davao City Road, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"KITAOTAO (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-06-07","lat":7.589762,"lon":125.19727,"sm":713,"fm":713,"tm":null,"am":1189,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7368},{"i":9259,"cid":"22N00186","pid":"P00642637MN","t":"Repair/Rehabilitation of Magtiaco River Control, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"ALEGRIA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GONZALODO ENTERPRISES / RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R","c":120619605.8,"abc":120625000.0,"fy":"2022","sd":"09/12/2022","cd":"2023-05-09","lat":9.48506,"lon":125.57828,"sm":30,"fm":30,"tm":null,"am":30,"md":0.0,"ls":"inside","ww":"Magtiaco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7369},{"i":9260,"cid":"23L00170","pid":"P00734401MN","t":"Construction of Tuganay River Protection Dike Project, Brgy. Casig-ang, Santo Tomas, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"SANTO TOMAS (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"FORDEX CONSTRUCTION CORPORATION","c":19268153.77,"abc":19800000.0,"fy":"2023","sd":"11/17/2023","cd":"2024-05-17","lat":7.46258,"lon":125.64916,"sm":1420,"fm":1420,"tm":1420,"am":1420,"md":0.0,"ls":"inside","ww":"Tuganay","wn":"Tuganay River","wd":0.02,"wp":[7.46252,125.64899],"wst":"matched","br":"Casig-ang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7370},{"i":9261,"cid":"23NF0038","pid":"P00734011MN","t":"Construction of Shore Protection, Brgy. Libertad, Gen. Luna, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GENERAL LUNA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"DUROS DEVELOPMENT CORP.","c":77189906.96,"abc":77200000.0,"fy":"2023","sd":"05/03/2023","cd":"2024-11-02","lat":9.824902,"lon":126.142731,"sm":574,"fm":574,"tm":574,"am":574,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Libertad","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7371},{"i":9262,"cid":"21MB0094","pid":"P00550515MN","t":"Construction/Upgrading/Rehabilitation of Drainage along National Roads-Secondary-Jct. Digos-Buayan Airport Road, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"General Santos City","deo":"South Cotabato 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":39193358.97,"abc":39200000.0,"fy":"2021","sd":"03/22/2022","cd":"2023-12-19","lat":6.128585,"lon":125.197309,"sm":578,"fm":null,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7372},{"i":9263,"cid":"22NB0021","pid":"P00620192MN","t":"Construction of Patin-ay River Dike (Upstream), Sta. 0+000.00 - Sta. 0+500.00, Prosperidad, Agusan del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ABADA CONSTRUCTION AND SUPPLY","c":11759986.07,"abc":11760000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-17","lat":8.556237,"lon":125.945351,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":"Patin-ay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7373},{"i":9264,"cid":"23N00113","pid":"P00721333MN","t":"Construction of Flood Mitigation Structure along Obod-obod Creek, Package 1, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":144749994.7,"abc":144750000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-04-09","lat":8.94889,"lon":125.57851,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Obod-obod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7374},{"i":9265,"cid":"22LB0122","pid":"P00620079MN","t":"Construction of Revetment along Panacan River, Sta. 1+400 - Sta. 1+700, South Side, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"04/07/2022","cd":"2023-02-26","lat":7.151458,"lon":125.652387,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Panacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7375},{"i":9266,"cid":"22K00367","pid":"P00620028MN","t":"Construction of Flood Control Dike along Mangiskis River (Upstream), Sta. 0+000.00 - Sta. 0+471.925, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":94563372.94,"abc":96500000.0,"fy":"2022","sd":"08/08/2022","cd":"2024-02-08","lat":8.823659,"lon":125.09415,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Mangiskis","wn":"Mangiskis River","wd":0.01,"wp":[8.82369,125.09428],"wst":"matched","br":null,"len":471.9,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7376},{"i":9267,"cid":"22IL0029","pid":"P00620226VS","t":"Construction of Catublian Flood Control, Hinunangan, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"HINUNANGAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-11-15","lat":10.382748,"lon":125.201046,"sm":624,"fm":624,"tm":624,"am":624,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7377},{"i":9268,"cid":"23NB0015","pid":"P00721484MN","t":"Construction of Revetment along Gibong River, Azpetia Bridge Section, Prosperidad, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":96498838.04,"abc":96500000.0,"fy":"2023","sd":"03/31/2023","cd":"2024-09-03","lat":8.637658,"lon":125.948414,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":"Gibong","wn":"Gibong River","wd":2.08,"wp":[8.63453,125.92979],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7378},{"i":9269,"cid":"22LG0023","pid":"P00620180MN","t":"Construction of Flood Mitigation Structure along Surop River, Sta. 0+000 - Sta. 0+500, Governor Generoso, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"GOVERNOR GENEROSO (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-30","lat":6.46135,"lon":126.14413,"sm":593,"fm":593,"tm":593,"am":593,"md":0.0,"ls":"inside","ww":"Surop","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7379},{"i":9270,"cid":"23KA0075","pid":"P00721420MN","t":"Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Downstream of New Batangan Bridge, Brgy. Poblacion Section, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":48250000.0,"abc":49000000.0,"fy":"2023","sd":"01/31/2023","cd":"2024-01-01","lat":7.903618,"lon":125.09493,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Mindanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7380},{"i":9271,"cid":"22NG0043","pid":"P00630634MN","t":"Construction of Campo-Cabugao Flood Control Structure, Barangay Cabugao, Bacuag, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BACUAG (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ROIM BUILDERS & CONSTRUCTION SUPPLY","c":48510346.88,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-10-13","lat":9.590428,"lon":125.653926,"sm":99,"fm":99,"tm":99,"am":99,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cabugao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7381},{"i":9272,"cid":"22NG0038","pid":"P00630552MN","t":"Construction of River Control Structure, Barangay Cawilan, Tubod, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TUBOD (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. / C'ZARLES CONSTRUCTION & SUPPLY","c":82014385.81,"abc":82025000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-12-31","lat":9.549556,"lon":125.579472,"sm":1596,"fm":1596,"tm":1596,"am":1596,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cawilan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7382},{"i":9273,"cid":"24KK0032","pid":"P00820015MN","t":"Construction of Flood Control Dike along Linugos River (Upstream of Kibungsod Bridge), Magsaysay, Misamis Oriental (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"MAGSAYSAY (LINUGOS) (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":86852678.85,"abc":86853860.0,"fy":"2024","sd":"03/14/2024","cd":"2024-12-20","lat":9.0039,"lon":125.2041,"sm":869,"fm":869,"tm":869,"am":869,"md":0.0,"ls":"inside","ww":"Linugos","wn":"Linugos River","wd":0.01,"wp":[9.004,125.20418],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7383},{"i":9274,"cid":"22LE0041","pid":"P00630608MN","t":"Construction of Slope Protection at Brgy. Lacaron, Malita, Davao Occidental","w":"Construction of Slope Protection Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"FORTSTONE CONSTRUCTION ENTERPRISES","c":14695699.85,"abc":14700000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-07-04","lat":6.481736,"lon":125.580288,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lacaron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7384},{"i":9275,"cid":"23K00062","pid":"P00721414MN","t":"Construction of Flood Control Structure (with esplanade) along Pulangi River, Brgy. Poblacion, Package 4, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":178780664.0,"abc":183000000.0,"fy":"2023","sd":"02/13/2023","cd":"2025-01-26","lat":7.89507,"lon":125.095147,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.09,"wp":[7.89561,125.09577],"wst":"matched","br":"Poblacion","len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7385},{"i":9276,"cid":"22NB0011","pid":"P00620106MN","t":"Construction of Revetment along Agusan River Basin, Esperanza Bridge Approaches, Sta. 0+000.00 - Sta. 0+400.00, Esperanza, Agusan del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ADFIL CORPORATION","c":96499842.72,"abc":96500000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-05-22","lat":8.659581,"lon":125.654539,"sm":553,"fm":553,"tm":553,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.08,"wp":[8.6593,125.65386],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7386},{"i":9277,"cid":"22LA0082","pid":"P00620265MN","t":"Construction of Revetment along Agusan River (Upstream), Sta. 4+640 - Sta. 5+070 (LS), Sta. 5+070.00 - Sta. 5+909.00 (LS), Brgy. Cambagang, Maragusan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MARAGUSAN (SAN MARIANO) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":48995984.83,"abc":48999973.13,"fy":"2022","sd":"04/04/2022","cd":"2022-12-08","lat":7.368287,"lon":126.144625,"sm":931,"fm":931,"tm":931,"am":931,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":29.26,"wp":[7.63065,126.11295],"wst":"matched","br":"Cambagang","len":1269.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7387},{"i":9278,"cid":"22ME0122","pid":"P00634140MN","t":"Construction of Drainage Canal, Barangay Poblacion, Glan, Sarangani","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SARANGANI","mu":"GLAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":4942646.4,"abc":4950000.0,"fy":"2022","sd":"07/28/2022","cd":"2023-06-28","lat":5.818864,"lon":125.2103,"sm":588,"fm":588,"tm":588,"am":588,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7388},{"i":9279,"cid":"22NB0013","pid":"P00620293MN","t":"Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+540.00 R/S, Sta. 0+000.00 - Sta. 0+080.00 L/S, Brgy. Azpetia, Prosperidad, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":45079878.7,"abc":45080000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-08-24","lat":8.637447,"lon":125.948708,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":"Azpetia","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Azpetia","len":620.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7389},{"i":9280,"cid":"23NE0029","pid":"P00721395MN","t":"Construction of Flood Control Structure at Bebot Br., Barangay Mabini, Tubajon, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"TUBAJON (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"BAMBOE CONSTRUCTION","c":1958638.87,"abc":1960000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-05-15","lat":10.28722,"lon":125.58083,"sm":1588,"fm":1588,"tm":1588,"am":1588,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabini","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7390},{"i":9281,"cid":"23NH0111","pid":"P00746138MN","t":"Rehabilitation of Slope Protection Bajao Bridge (B0149MN) - K1312+795 (Abutment A), Barangay Bajao, Tago, Surigao del Sur - Secondary Roads","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ROWIE'S CONSTRUCTION","c":15439540.08,"abc":15440000.0,"fy":"2023","sd":"01/10/2024","cd":"2024-07-21","lat":8.98387,"lon":126.15294,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bajao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7391},{"i":9282,"cid":"21K00260","pid":"P00522061MN","t":"Construction of Flood Control Structure (with esplanade) along Pulangi River, Brgy. Poblacion (Purok 17A), Package 2, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"City of Valencia","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":114591423.9,"abc":120625000.0,"fy":"2021","sd":"08/16/2021","cd":"2022-12-23","lat":7.91936,"lon":125.096744,"sm":435,"fm":null,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.09,"wp":[7.91876,125.0973],"wst":"matched","br":"Poblacion","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7392},{"i":9283,"cid":"22NG0045","pid":"P00630635MN","t":"Construction of Dapja-Katunggan Flood Control Structure, Tagana-an, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TAGANA-AN (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":48506718.4,"abc":49000000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-12-31","lat":9.69801,"lon":125.58095,"sm":1510,"fm":1510,"tm":1510,"am":1510,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7393},{"i":9284,"cid":"22NG0052","pid":"P00631118MN","t":"Construction of Seawall, Barangay Patino, Tagana-an, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TAGANA-AN (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ROMZ BUILDERS","c":6855886.45,"abc":6930000.0,"fy":"2022","sd":"04/01/2022","cd":"2023-01-09","lat":9.71304,"lon":125.65491,"sm":1510,"fm":1510,"tm":1510,"am":1510,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7394},{"i":9285,"cid":"24KA0131","pid":"P00835862MN","t":"Construction of Flood Control Structure, Barangay Sinanglanan, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-12-13","lat":7.999928,"lon":125.213028,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sinanglanan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7395},{"i":9286,"cid":"23N00143","pid":"P00732101MN","t":"Construction of Flood Control Structure along Doyos River, Brgy. Doyos, Carrascal, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CARRASCAL (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC. / VJP CONSTRUCTION & SUPPLY","c":106149995.5,"abc":106150000.0,"fy":"2023","sd":"05/29/2023","cd":"2024-01-03","lat":9.372011,"lon":125.951647,"sm":345,"fm":345,"tm":345,"am":345,"md":0.0,"ls":"inside","ww":"Doyos","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Doyos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7396},{"i":9287,"cid":"22LD0044","pid":"P00630522MN","t":"Construction of Revetment along Matanao River (Kasyawa Bridge Section), Matanao, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MATANAO (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-11-14","lat":6.703735,"lon":125.214382,"sm":953,"fm":953,"tm":953,"am":953,"md":0.0,"ls":"inside","ww":"Matanao","wn":"Matanao River","wd":0.02,"wp":[6.70374,125.21422],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7397},{"i":9288,"cid":"22NG0023","pid":"P00630645MN","t":"Construction of Magtiaco River Flood Control Structure along Magtiaco Bridge (Phase 2), Barangay San Pedro, Alegria, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"ALEGRIA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":39180150.39,"abc":39200000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-09-24","lat":9.477,"lon":125.581,"sm":30,"fm":30,"tm":30,"am":30,"md":0.0,"ls":"inside","ww":"Magtiaco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7398},{"i":9289,"cid":"23K00060","pid":"P00721245MN","t":"Construction of Flood Control Structure (with esplanade) along Pulangi River, Barangay Poblacion, Package 3, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":117572812.2,"abc":120275000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-06-26","lat":7.892888,"lon":125.097674,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.08,"wp":[7.89337,125.0982],"wst":"matched","br":"Poblacion","len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7399},{"i":9290,"cid":"24NC0010","pid":"P00820360MN","t":"Construction of Agusan River Flood Control, Near Veruela Municipal Office, Veruela, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"VERUELA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC.","c":77199999.77,"abc":77200000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-10-21","lat":8.068256,"lon":125.955747,"sm":1625,"fm":1625,"tm":1625,"am":1625,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.05,"wp":[8.06808,125.95621],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7400},{"i":9291,"cid":"21LB0310","pid":"P00522192MN","t":"Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":24500000.0,"abc":24500000.0,"fy":"2021","sd":"04/13/2022","cd":"2023-03-16","lat":7.115659,"lon":125.655531,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sasa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7401},{"i":9292,"cid":"24MB0030","pid":"P00833598MN","t":"Construction of Drainage System, Barangay Baluan, General Santos City, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"MIGO CONSTRUCTION","c":4948990.26,"abc":4950000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-05-07","lat":6.123228,"lon":125.218193,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Baluan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7402},{"i":9293,"cid":"23NH0045","pid":"P00721662MN","t":"Construction of Dike along Tago River Basin, Brgy. Anahao, Tago, Surigao del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC.","c":48999797.35,"abc":49000000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-12-06","lat":8.958418,"lon":126.153607,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.06,"wp":[8.95877,126.15325],"wst":"matched","br":"Anahao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7403},{"i":9294,"cid":"21K00261","pid":"P00522070MN","t":"Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Left Side, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":null,"deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":61533022.77,"abc":64800715.0,"fy":"2021","sd":"07/23/2021","cd":"2022-07-25","lat":7.88823,"lon":125.098023,"sm":null,"fm":null,"tm":null,"am":435,"md":null,"ls":"unknown","ww":"Mindanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":163},{"i":9295,"cid":"24N00132","pid":"P00821211MN","t":"Construction of Agusan River Flood Control (Phase III), Veruela, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"VERUELA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC.","c":96499972.45,"abc":96500000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-18","lat":8.08444,"lon":125.96034,"sm":1625,"fm":1625,"tm":1625,"am":1625,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.05,"wp":[8.08399,125.96014],"wst":"matched","br":null,"len":null,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7404},{"i":9296,"cid":"21NF0040","pid":"P00550455MN","t":"Construction of Drainage System along Brgy Pob. 4 and Brgy. Pob. 2, General Luna, Surigao del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"General Luna","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":51483191.93,"abc":53075000.0,"fy":"2021","sd":"10/27/2021","cd":"2022-07-06","lat":9.78592,"lon":126.15555,"sm":574,"fm":null,"tm":574,"am":574,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pob. 4","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7405},{"i":9297,"cid":"21LB0322","pid":"P00550526MN","t":"Construction of Flood Control Mitigation Structure at Panacan River, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC. / GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"12/01/2021","cd":"2022-09-09","lat":7.151779,"lon":125.655611,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Panacan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7406},{"i":9298,"cid":"22LD0043","pid":"P00630521MN","t":"Construction of Revetment along Magallanes River (Magallanes Bridge Section), Matanao, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MATANAO (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-11-17","lat":6.72253,"lon":125.220197,"sm":953,"fm":953,"tm":953,"am":953,"md":0.0,"ls":"inside","ww":"Magallanes","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7407},{"i":9299,"cid":"24K00052","pid":"P00820023MN","t":"Construction of Flood Mitigating Structure along Pulangi River, Downstream of New Batangan Bridge, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 4th District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":42472153.73,"abc":43425000.0,"fy":"2024","sd":"03/04/2024","cd":"2024-12-28","lat":7.89228,"lon":125.098088,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.09,"wp":[7.89283,125.09869],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7408},{"i":9300,"cid":"24ND0064","pid":"P00820120MN","t":"Construction of Flood Mitigation Structure along Obod-obod Creek, Package 2, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":96497405.32,"abc":96497405.45,"fy":"2024","sd":"04/12/2024","cd":"2024-12-20","lat":8.948337,"lon":125.581481,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Obod-obod","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7409},{"i":9301,"cid":"23N00104","pid":"P00721485MN","t":"Construction of Agusan River Flood Control, Barangay Poblacion, Veruela, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"VERUELA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC. / FFJJ CONSTRUCTION","c":106149968.4,"abc":106150000.0,"fy":"2023","sd":"04/18/2023","cd":"2023-11-28","lat":8.079744,"lon":125.960603,"sm":1625,"fm":1625,"tm":1625,"am":1625,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.06,"wp":[8.08019,125.9603],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[9303],"run":[],"cl":[],"L":"records","s":64,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 212,299,701.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":70},{"i":9302,"cid":"24NC0029","pid":"P00820388MN","t":"Construction of Simulao River Bank Protection, Near Sta. Maria Bridge Approach ''B'', Upstream, Phase II, Trento, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"TRENTO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"JQG BUILDERS","c":67550000.0,"abc":67550000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-01","lat":8.017339,"lon":126.155672,"sm":1584,"fm":1584,"tm":1584,"am":1584,"md":0.0,"ls":"inside","ww":"Simulao","wn":"Simulao River","wd":0.06,"wp":[8.01745,126.15622],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7410},{"i":9303,"cid":"23N00105","pid":"P00721479MN","t":"Construction of Flood Control Structures along Solibao River Protecting Solibao Bridge, Rosario, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"CM TAN CONSTRUCTION","c":106149732.5,"abc":106150000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-02-09","lat":8.079744,"lon":125.960603,"sm":1220,"fm":1220,"tm":1220,"am":1625,"md":21.04,"ls":"outside","ww":"Solibao","wn":"Solibao River","wd":27.27,"wp":[8.3235,125.92465],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9301],"run":[],"cl":[],"L":"records","s":92,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.94,"value":21.04,"text":"The pin is 21.0 km outside Rosario, Agusan del Sur, the nearest municipality the record claims. It falls in Veruela, Agusan del Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.83,"value":27.27,"text":"The title names Solibao, which OpenStreetMap maps through the stated municipality, but the pin is 27.3 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 212,299,701.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":2},{"i":9304,"cid":"21IL0140","pid":"P00549878VS","t":"Construction of Road Slope Protection along Liloan, Southern Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":null,"deo":"Southern Leyte 1st District Engineering Office","co":"MORTAR MASTERS & CONCRETE BUILDERS / JM COLLERA KONSTRACT","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"11/22/2021","cd":"2022-10-07","lat":10.095193,"lon":125.222755,"sm":null,"fm":null,"tm":null,"am":791,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":164},{"i":9305,"cid":"22LB0195","pid":"P00630597MN","t":"Construction of Drainage Canal, Purok 12 to Davao River, Barangay Waan, Buhangin District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"CJEP BUILDERS AND ENGINEERING SERVICES","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-08-17","lat":7.129446,"lon":125.581825,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.24,"wp":[7.13094,125.58336],"wst":"matched","br":"Waan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7411},{"i":9306,"cid":"22K00359","pid":"P00634129MN","t":"Construction of Flood Control Structure (with Esplanade) along Pulangi River, Brgy. Batangan, Package 2, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":140591612.0,"abc":143550000.0,"fy":"2022","sd":"07/15/2022","cd":"2023-11-27","lat":7.918611,"lon":125.098153,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Pulangi","wn":"Pulangi River","wd":0.08,"wp":[7.91912,125.09768],"wst":"matched","br":"Batangan","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7412},{"i":9307,"cid":"24NC0028","pid":"P00820389MN","t":"Construction of Simulao Riverbank Protection, Near Sta. Maria Bridge Approach ''B'', Upstream, Trento, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"TRENTO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"BBC CONSTRUCTION / ADFIL CORPORATION","c":77200000.0,"abc":77200000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-11-21","lat":8.018797,"lon":126.155675,"sm":1584,"fm":1584,"tm":1584,"am":1584,"md":0.0,"ls":"inside","ww":"Simulao","wn":"Simulao River","wd":0.03,"wp":[8.01885,126.15594],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7413},{"i":9308,"cid":"21LB0324","pid":"P00550554MN","t":"Construction of Flood Mitigation Structure at Sasa Creek Outfall, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"11/21/2021","cd":"2022-07-10","lat":7.114217,"lon":125.657252,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Sasa","wn":"Sasa Creek","wd":0.01,"wp":[7.11429,125.6573],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7414},{"i":9309,"cid":"24N00093","pid":"P00820359MN","t":"Construction of Agusan River Flood Control (Phase II), Veruela, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"VERUELA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC.","c":173699867.9,"abc":173700000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-11-18","lat":8.081506,"lon":125.961875,"sm":1625,"fm":1625,"tm":1625,"am":1625,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.04,"wp":[8.08164,125.96149],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7415},{"i":9310,"cid":"21LB0323","pid":"P00550539MN","t":"Rehabilitation of Drainage Structure at Sasa Creek, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":57900000.0,"abc":57900000.0,"fy":"2021","sd":"09/26/2022","cd":"2023-11-24","lat":7.114349,"lon":125.657324,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Sasa","wn":"Sasa Creek","wd":0.01,"wp":[7.1143,125.65729],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7416},{"i":9311,"cid":"23NC0020","pid":"P00721519MN","t":"Rehabilitation of Simulao River Bank Protection Near Sta. Maria Bridge Approach ''B'' Upstream, Trento, Agusan del Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"TRENTO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ADFIL CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-09","lat":8.01896,"lon":126.15649,"sm":1584,"fm":1584,"tm":1584,"am":1584,"md":0.0,"ls":"inside","ww":"Simulao","wn":"Simulao River","wd":0.06,"wp":[8.01885,126.15594],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7417},{"i":9312,"cid":"23NC0056","pid":"P00734417MN","t":"Flood Mitigation along Adlayan River Bank (Downstream) San Francisco, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN FRANCISCO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"YES CONSTRUCTION / ARN BUILDERS, INC. (FOR: ARN BUILDERS)","c":48999999.42,"abc":49000000.0,"fy":"2023","sd":"06/20/2023","cd":"2024-03-27","lat":8.51063,"lon":125.9704,"sm":1279,"fm":1279,"tm":null,"am":1279,"md":0.0,"ls":"inside","ww":"Adlayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7418},{"i":9313,"cid":"23KK0082","pid":"P00721561MN","t":"Construction of Flood Control along Mangiskis River Downstream, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"VEN RAY CONSTRUCTION CORPORATION","c":65957750.0,"abc":65957750.0,"fy":"2023","sd":"05/22/2023","cd":"2024-02-28","lat":8.82716,"lon":125.098293,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Mangiskis","wn":"Mangiskis River","wd":0.31,"wp":[8.8286,125.09592],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7419},{"i":9314,"cid":"23NG0039","pid":"P00734003MN","t":"Construction of Flood Control Structure along Tagana-an River, Tagana-an, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TAGANA-AN (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":96499662.25,"abc":96500000.0,"fy":"2023","sd":"05/09/2023","cd":"2023-11-20","lat":9.692559,"lon":125.581834,"sm":1510,"fm":1510,"tm":1510,"am":1510,"md":0.0,"ls":"inside","ww":"Tagana-an","wn":"Tagana-an River","wd":0.02,"wp":[9.69244,125.58177],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7420},{"i":9315,"cid":"22IL0102","pid":"P00620407VS","t":"Construction of Slope Protection Structure along Son-ok Manglit Section, Pintuyan, So. Leyte","w":"Construction of Slope Protection Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"PINTUYAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"COLLERA CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-04-20","lat":9.968,"lon":125.224,"sm":1144,"fm":1144,"tm":1144,"am":1144,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7421},{"i":9316,"cid":"23LG0061","pid":"P00732070MN","t":"Construction of Flood Mitigation Structure along Upper Sumlog River, Package 1, Barangay Marayag, Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":85053656.01,"abc":86850000.0,"fy":"2023","sd":"03/30/2023","cd":"2024-02-06","lat":7.157783,"lon":126.158853,"sm":833,"fm":833,"tm":833,"am":833,"md":0.0,"ls":"inside","ww":"Upper Sumlog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Marayag","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7422},{"i":9317,"cid":"24N00088","pid":"P00833295MN","t":"Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Package 2, Barangay Anticala, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":192999994.4,"abc":193000000.0,"fy":"2024","sd":"03/06/2024","cd":"2025-02-16","lat":9.011911,"lon":125.658036,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Taguibo","wn":"Taguibo River","wd":0.05,"wp":[9.01201,125.65763],"wst":"matched","br":"Anticala","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7423},{"i":9318,"cid":"22LA0085","pid":"P00620268MN","t":"Construction of Revetment along Hijo River, Sta. 0+550.07 - Sta. 1+837.070 (RS), Sta. 1+547.930 - Sta. 1+870.930 (LS), Brgy. Elizalde, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48999917.26,"abc":48999963.76,"fy":"2022","sd":"04/06/2022","cd":"2023-01-29","lat":7.373778,"lon":125.970565,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":1.68,"wp":[7.38838,125.97479],"wst":"matched","br":"Elizalde","len":1610.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7424},{"i":9319,"cid":"23N00119","pid":"P00721488MN","t":"Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Package 2, Barangay Anticala, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":113869975.0,"abc":113870000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-03-12","lat":9.01265,"lon":125.658375,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Taguibo","wn":"Taguibo River","wd":0.03,"wp":[9.01243,125.65826],"wst":"matched","br":"Anticala","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7425},{"i":9320,"cid":"23NA0021","pid":"P00721342MN","t":"Construction of River Bank Protection along Agusan River, Maningalao Section (Protecting Magus Bridge), Las Nieves, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"DATREBIL CONSTRUCTION & SUPPLY","c":95431916.75,"abc":96500000.0,"fy":"2023","sd":"03/06/2023","cd":"2024-08-31","lat":8.728675,"lon":125.581842,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.08,"wp":[8.72841,125.5825],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7426},{"i":9321,"cid":"23M00048","pid":"P00721304MN","t":"Construction of Glan River Control, Package A, Glan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"GLAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"AAA ROCK CONSTRUCTION CORPORATION (FORMERLY: DAVAO ROCK MIXER ENTERPRISES) / CHARIFER BUILDERS, INC.","c":96499427.78,"abc":96500000.0,"fy":"2023","sd":"04/05/2023","cd":"2024-01-23","lat":5.824167,"lon":125.227778,"sm":588,"fm":588,"tm":588,"am":588,"md":0.0,"ls":"inside","ww":"Glan","wn":"Glan River","wd":0.04,"wp":[5.82449,125.22798],"wst":"matched","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7427},{"i":9322,"cid":"24K00107","pid":"P00820026MN","t":"Construction of Flood Mitigating Structure within Mindanao River Basin, along Pulangi River, Package 3, Downstream of Old Batangan Bridge, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 4th District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":66097734.85,"abc":67550000.0,"fy":"2024","sd":"04/18/2024","cd":"2025-02-06","lat":7.891293,"lon":125.098392,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Mindanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7428},{"i":9323,"cid":"23NH0084","pid":"P00744978MN","t":"Rehabilitation/Reconstruction of Scoured Revetment at Approach ''B'' (Upstream-Right Side) along Surigao-Davao Coastal Road/Tago-Gamut Bridge, Gamut-Tago, Surigao del Sur, Sta. 0+000 - Sta. 0+282.59","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":92057573.39,"abc":92059070.0,"fy":"2023","sd":"06/13/2023","cd":"2024-03-04","lat":8.99267,"lon":126.159167,"sm":1516,"fm":1516,"tm":null,"am":1516,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":282.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7429},{"i":9324,"cid":"22K00162","pid":"P00620161MN","t":"Construction of Revetment at Gahub River Upstream, Sta. 0+000.00 - Sta. 0+165.00, Gingoog City, Misamis Oriental (Phase 1)","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":43424990.3,"abc":48250000.0,"fy":"2022","sd":"06/29/2022","cd":"2024-03-09","lat":8.818235,"lon":125.098427,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gahub","wn":"Gahub River","wd":0.02,"wp":[8.81826,125.09856],"wst":"matched","br":null,"len":165.0,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7430},{"i":9325,"cid":"23NA0007","pid":"P00721346MN","t":"Construction of Riverdike along Lingayao Bridge, Las Nieves, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"TRIPARCO DEVELOPMENT CORPORATION","c":96499990.36,"abc":96500000.0,"fy":"2023","sd":"02/16/2023","cd":"2024-02-15","lat":8.742804,"lon":125.581862,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7431},{"i":9326,"cid":"24NC0046","pid":"P00836162MN","t":"Construction of Flood Mitigation Structure along Adlayan Riverbank (Upstream), Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN FRANCISCO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"YES CONSTRUCTION / ARN BUILDERS, INC. (FOR: ARN BUILDERS)","c":49499999.46,"abc":49500000.0,"fy":"2024","sd":"06/11/2024","cd":"2025-01-17","lat":8.511406,"lon":125.970911,"sm":1279,"fm":1279,"tm":null,"am":1279,"md":0.0,"ls":"inside","ww":"Adlayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7432},{"i":9327,"cid":"22ME0109","pid":"P00634141MN","t":"Construction of Flood Mitigation Structure, Barangay Lago, Glan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"GLAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"JAYSABB CONSTRUCTION AND SUPPLY","c":4947996.36,"abc":4950000.0,"fy":"2022","sd":"06/14/2022","cd":"2022-11-08","lat":5.88971,"lon":125.23036,"sm":588,"fm":588,"tm":588,"am":588,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lago","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7433},{"i":9328,"cid":"22NH0040","pid":"P00630653MN","t":"Construction of Dike, San Antonio, Tandag City, Surigao del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF TANDAG (CAPITAL) (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"SURIGAO LA SUERTE CORPORATION","c":4436701.22,"abc":4900000.0,"fy":"2022","sd":"08/08/2022","cd":"2022-12-31","lat":9.135556,"lon":126.164722,"sm":430,"fm":430,"tm":430,"am":430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7434},{"i":9329,"cid":"22LE0029","pid":"P00620057MN","t":"Construction of Concrete Revetment, Culaman, Sta. 0+000 - Sta. 2+000, Jose Abad Santos, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"JOSE ABAD SANTOS (TRINIDAD) (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-02","lat":5.961665,"lon":125.65931,"sm":675,"fm":675,"tm":675,"am":675,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7435},{"i":9330,"cid":"24KA0033","pid":"P00820141MN","t":"Construction of Manupali RIS Drainage System, Lantapan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"LANTAPAN (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"AL-NAJIM CONSTRUCTION CORPORATION","c":9800000.0,"abc":9800000.0,"fy":"2024","sd":"01/26/2024","cd":"2024-07-23","lat":8.005203,"lon":125.098525,"sm":747,"fm":747,"tm":747,"am":747,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7436},{"i":9331,"cid":"23NC0045","pid":"P00734418MN","t":"Flood Mitigation along Adlayan River Bank (Upstream) San Francisco, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN FRANCISCO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"YES CONSTRUCTION / ARN BUILDERS, INC. (FOR: ARN BUILDERS)","c":48999991.43,"abc":49000000.0,"fy":"2023","sd":"05/16/2023","cd":"2024-03-18","lat":8.51144,"lon":125.97138,"sm":1279,"fm":1279,"tm":null,"am":1279,"md":0.0,"ls":"inside","ww":"Adlayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7437},{"i":9332,"cid":"23N00118","pid":"P00721487MN","t":"Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Package 1, Barangay Anticala, Butuan City, Agusan del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":113869997.2,"abc":113870000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-03-12","lat":9.01175,"lon":125.65978,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Taguibo","wn":"Taguibo River","wd":0.05,"wp":[9.01132,125.65957],"wst":"matched","br":"Anticala","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7438},{"i":9333,"cid":"23NH0044","pid":"P00734005MN","t":"Construction of Flood Control Structure along Tago River Basin, Barangay Gamut, Tago, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":96499979.92,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-05-03","lat":9.0025,"lon":126.166111,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.05,"wp":[9.00208,126.16633],"wst":"matched","br":"Gamut","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7439},{"i":9334,"cid":"23KA0101","pid":"P00733990MN","t":"Construction of Flood Mitigation Structure, Sitio Lagaan, Brgy. Apo Macote, Malaybalay City","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-11-13","lat":7.971739,"lon":125.233785,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Apo Macote","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7440},{"i":9335,"cid":"22K00055","pid":"P00620215MN","t":"Construction of Flood Mitigation Structure within Mindanao River Basin (along Pulangui River) Package 1, Downstream of Old Batangan Br., Brgy. Batangan Section, Sta. 0+000.00 - Sta. 1+535.00, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":137151056.3,"abc":144750000.0,"fy":"2022","sd":"05/23/2022","cd":"2023-12-31","lat":7.891385,"lon":125.099782,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Mindanao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Batangan Section","len":1535.0,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7441},{"i":9336,"cid":"23NA0022","pid":"P00721343MN","t":"Construction of Concrete Revetment Protecting Agusan-Malaybalay Road Section (Magus Bridge Section), Las Nieves, Agusan del Norte","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"DATREBIL CONSTRUCTION & SUPPLY","c":96499985.03,"abc":96500000.0,"fy":"2023","sd":"03/06/2023","cd":"2024-02-18","lat":8.728175,"lon":125.581872,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7442},{"i":9337,"cid":"22LA0159","pid":"P00620228MN","t":"Construction of Revetment along Hijo River, Sta. 3+400 - Sta. 6+000, Brgy. Panibasan, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"GIZA BUILDERS CORPORATION (FORMERLY: LITO HEAVY EQUIPMENT AND TRUCKING SERVICES) / ABU CONSTRUCTION","c":77199984.81,"abc":77199984.81,"fy":"2022","sd":"04/04/2022","cd":"2023-01-02","lat":7.395046,"lon":125.974408,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.0,"wp":[7.39502,125.97438],"wst":"matched","br":"Panibasan","len":2600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7443},{"i":9338,"cid":"22N00190","pid":"P00644473MN","t":"Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Brgy. Anticala, Butuan City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY / TRIPARCO DEVELOPMENT CORPORATION","c":154399877.5,"abc":154400000.0,"fy":"2022","sd":"12/09/2022","cd":"2023-07-31","lat":9.01175,"lon":125.66216,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Taguibo","wn":"Taguibo River","wd":0.04,"wp":[9.01142,125.66229],"wst":"matched","br":"Anticala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7444},{"i":9339,"cid":"22MB0027","pid":"P00631108MN","t":"Construction of Drainage at Rosas Street, Barangay Dadiangas South, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"VANVI CONSTRUCTION","c":4914570.5,"abc":4950000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-08-09","lat":6.207222,"lon":125.234444,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas South","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7445},{"i":9340,"cid":"24MC0046","pid":"P00820344MN","t":"Construction of Flood Control Dike along Kabacan River Sta. 48 + 620 - Sta. 48 + 944 L/S, Barangay Doles, Magpet, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":96017492.67,"abc":96500000.0,"fy":"2024","sd":"07/03/2024","cd":"2025-05-27","lat":7.122604,"lon":125.101966,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.11,"wp":[7.12252,125.10094],"wst":"matched","br":"Doles","len":324.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7446},{"i":9341,"cid":"24L00193","pid":"P00833287MN","t":"Construction of Concrete Revetment at Lasang River, Panabo, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"PANABO CITY (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"AARJG BUILDERS CORPORATION / RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY)","c":48249996.91,"abc":47767500.0,"fy":"2024","sd":"05/22/2024","cd":"2024-12-15","lat":7.275939,"lon":125.667116,"sm":410,"fm":410,"tm":410,"am":410,"md":0.0,"ls":"inside","ww":"Lasang","wn":"Lasang River","wd":0.01,"wp":[7.276,125.66706],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0101,"text":"Contract cost is 1.01% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":820},{"i":9342,"cid":"22MB0024","pid":"P00630530MN","t":"Construction of Revetment along Tinagacan-Buayan River (Phase 3), Brgy. Tinagacan, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":91629683.47,"abc":91675000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-01-20","lat":6.207778,"lon":125.235,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Tinagacan-Buayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tinagacan","len":null,"ph":"Phase 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7447},{"i":9343,"cid":"22NG0019","pid":"P00630640MN","t":"Construction of Flood Control Structure, Barangay San Juan, Alegria, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"ALEGRIA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":48997779.87,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2023-03-09","lat":9.50214,"lon":125.58239,"sm":30,"fm":30,"tm":30,"am":30,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Juan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7448},{"i":9344,"cid":"21NC0075","pid":"P00522271MN","t":"Rehabilitation of Minabang Creek, Sta. 0 + 000 - Sta. 0 + 300, Agusan del Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 2nd District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D / LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"06/11/2021","cd":"2022-07-14","lat":8.50877,"lon":125.97638,"sm":null,"fm":null,"tm":null,"am":1279,"md":null,"ls":"unknown","ww":"Minabang","wn":"Minabang Creek","wd":0.0,"wp":[8.50875,125.9764],"wst":"matched","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":165},{"i":9345,"cid":"22LA0157","pid":"P00620080MN","t":"Construction of Revetment along Pantud Creek, Sta. 10+100 - Sta. 12+100, Brgy. Poblacion - Brgy. Magsaysay, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":57898840.84,"abc":57899903.0,"fy":"2022","sd":"04/06/2022","cd":"2022-12-22","lat":7.608244,"lon":125.97644,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":"Pantud","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7449},{"i":9346,"cid":"22NH0023","pid":"P00620253MN","t":"Construction of Flood Control Structure along Tago River Basin, Brgy. Gamut, Sta. 0+000.00 - Sta. 0+346.00, Tago, Surigao Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":86849919.38,"abc":86850000.0,"fy":"2022","sd":"07/18/2022","cd":"2023-05-30","lat":9.003055,"lon":126.167777,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.05,"wp":[9.00262,126.16792],"wst":"matched","br":"Gamut","len":346.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7450},{"i":9347,"cid":"22LA0170","pid":"P00620230MN","t":"Construction of Revetment along Masara River leading to Hijo River, Sta. 0+400 - Sta. 2+940, Brgy. Elizalde to Brgy. Tagbaros, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":77199830.31,"abc":77199830.31,"fy":"2022","sd":"04/04/2022","cd":"2023-01-02","lat":7.387718,"lon":125.978576,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Masara","wn":"Masara River","wd":0.04,"wp":[7.38804,125.9784],"wst":"matched","br":"Elizalde","len":2540.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7451},{"i":9348,"cid":"22NH0050","pid":"P00630656MN","t":"Construction of Seawall, Barangay Balibadon, Cortes, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CORTES (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"JMT CONSTRUCTION","c":9779099.12,"abc":9800000.0,"fy":"2022","sd":"08/08/2022","cd":"2022-11-08","lat":9.1444,"lon":126.1733,"sm":460,"fm":460,"tm":460,"am":460,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Balibadon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7452},{"i":9349,"cid":"22ME0125","pid":"P00634142MN","t":"Construction of Flood Mitigation Structure, Barangay Mudan, Glan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"GLAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"VERGUZ CONSTRUCTION","c":4844775.59,"abc":4950000.0,"fy":"2022","sd":"06/23/2022","cd":"2023-08-07","lat":5.84195,"lon":125.23626,"sm":588,"fm":588,"tm":588,"am":588,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mudan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7453},{"i":9350,"cid":"23NC0073","pid":"P00734419MN","t":"Construction of Drainage Canal along Anahaw Street, San Francisco, Agusan del Sur","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN FRANCISCO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"10/02/2023","cd":"2024-03-01","lat":8.50674,"lon":125.98031,"sm":1279,"fm":1279,"tm":1279,"am":1279,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7454},{"i":9351,"cid":"22NH0062","pid":"P00630658MN","t":"Construction of Slope Protection Structure (Dike), Burgos National High School, Barangay Burgos, Cortes, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CORTES (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"SURIGAO LA SUERTE CORPORATION","c":4540872.44,"abc":4900000.0,"fy":"2022","sd":"06/27/2022","cd":"2022-11-05","lat":9.2411,"lon":126.1733,"sm":460,"fm":460,"tm":460,"am":460,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Burgos","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7455},{"i":9352,"cid":"23ND0064","pid":"P00734001MN","t":"Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"OLIN DEVELOPMENT ENGINEERING & CONSTRUCTION","c":4811448.34,"abc":4819547.16,"fy":"2023","sd":"06/21/2023","cd":"2023-10-18","lat":8.74356,"lon":125.66978,"sm":758,"fm":758,"tm":758,"am":370,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Marcos Calo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7456},{"i":9353,"cid":"24ND0039","pid":"P00820376MN","t":"Construction of Flood Mitigation Structure along Agusan River (Dankias Section) Package 1, Butuan City","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION","c":137272357.6,"abc":137272364.1,"fy":"2024","sd":"05/08/2024","cd":"2025-05-30","lat":8.759608,"lon":125.58247,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.09,"wp":[8.75919,125.5832],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7457},{"i":9354,"cid":"22II0021","pid":"P00630236VS","t":"Construction of Flood Control Structure, Phase I, Barangay Bangon, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"GAMAY (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JUPA CONSTRUCTION / JCL CONSTRUCTION AND SUPPLY","c":48917835.03,"abc":48999939.29,"fy":"2022","sd":"02/14/2022","cd":"2022-10-15","lat":12.365569,"lon":125.236432,"sm":562,"fm":562,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangon","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7458},{"i":9355,"cid":"23KA0045","pid":"P00721366MN","t":"Construction of Flood Mitigation Structure along Sayre Highway (Malingon Creek), Barangay Bagontaas, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"01/31/2023","cd":"2023-11-11","lat":7.943885,"lon":125.103123,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":"Malingon","wn":"Malingon Creek","wd":0.02,"wp":[7.94385,125.10294],"wst":"matched","br":"Bagontaas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7459},{"i":9356,"cid":"23LA0077","pid":"P00734027MN","t":"Construction of Box Culvert/Drainage System, Liboac Brgy. Elizalde, Davao de Oro","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"GIZA BUILDERS CORPORATION (FORMERLY: LITO HEAVY EQUIPMENT AND TRUCKING SERVICES)","c":14700000.0,"abc":14700000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-11-30","lat":7.394146,"lon":125.992719,"sm":851,"fm":851,"tm":null,"am":851,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Elizalde","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7460},{"i":9357,"cid":"22L00067","pid":"P00620234MN","t":"Construction of Tagum-Libuganon Flood Control Structure, Mabantao Section, Kapalong, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"KAPALONG (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"TAGUM BUILDERS CONTRACTORS CORP. (FORMERLY: TAGUM / THREE W BUILDERS, INC.","c":96417657.68,"abc":96500000.0,"fy":"2022","sd":"04/08/2022","cd":"2023-02-02","lat":7.63991,"lon":125.671552,"sm":697,"fm":697,"tm":697,"am":697,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7461},{"i":9358,"cid":"21MB0022","pid":"P00522371MN","t":"Construction of Flood Control/Concrete Revetment along Tinagacan-Buayan River (Phase 2), Barangay Tinagacan, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"General Santos City","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":45389626.18,"abc":49000000.0,"fy":"2021","sd":"03/11/2022","cd":"2023-03-21","lat":6.205003,"lon":125.237423,"sm":578,"fm":null,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Tinagacan-Buayan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Tinagacan","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7462},{"i":9359,"cid":"22KA0059","pid":"P00630571MN","t":"Construction of Spillway, Barangay Bontongon, Impasug-ong, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"IMPASUG-ONG (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"MAMAWAG CONSTRUCTION","c":24500000.0,"abc":24500000.0,"fy":"2022","sd":"01/28/2022","cd":"2022-11-28","lat":8.288587,"lon":125.105992,"sm":637,"fm":637,"tm":637,"am":637,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bontongon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7463},{"i":9360,"cid":"23MB0077","pid":"P00721460MN","t":"Construction of Concrete Revetment, Makar River, (Downstream of Upper Makar Bridge), General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) / REYDAN BUILDERS","c":51143542.75,"abc":51145000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-09-23","lat":6.084358,"lon":125.107489,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Makar","wn":"Makar River","wd":0.09,"wp":[6.08515,125.10757],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7464},{"i":9361,"cid":"22NG0022","pid":"P00630644MN","t":"Construction of Magtiaco River Flood Control along Magtiaco River, Barangay San Pedro, Alegria, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"ALEGRIA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":48492094.22,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-08-07","lat":9.47456,"lon":125.58272,"sm":30,"fm":30,"tm":30,"am":30,"md":0.0,"ls":"inside","ww":"Magtiaco","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Pedro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7465},{"i":9362,"cid":"22LA0081","pid":"P00620229MN","t":"Construction of Revetment along Manat River (Up- stream and Down Stream) leading to Agusan River, Sta. 12+793.671 - Sta. 13+057.781 (LS), Sta. 13+066.790 - Sta. 13+200 (LS), Bankeruhan Sur to Bankeruhan Norte, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"DBR CONSTRUCTION CORPORATION (FORMERLY: D.B. RAVELO CONSTRUCTION & SUPPLY) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":86849797.88,"abc":86849957.05,"fy":"2022","sd":"04/04/2022","cd":"2022-12-15","lat":7.729638,"lon":125.997115,"sm":989,"fm":989,"tm":null,"am":989,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.04,"wp":[7.72932,125.99736],"wst":"matched","br":null,"len":397.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7466},{"i":9363,"cid":"22LC0099","pid":"P00630606MN","t":"Construction of Flood Control Project (Dike with Road on Top) Along Tuganay River (Lucutan to Tuganay Bridge), Carmen, Davao del Norte","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-11","lat":7.401242,"lon":125.671856,"sm":339,"fm":339,"tm":339,"am":231,"md":0.01,"ls":"boundary","ww":"Tuganay","wn":"Tuganay River","wd":1.15,"wp":[7.40853,125.67933],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7467},{"i":9364,"cid":"22II0022","pid":"P00630237VS","t":"Construction of Flood Control Structure, Phase II, Barangay Bangon, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"GAMAY (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":48509900.0,"abc":48999944.75,"fy":"2022","sd":"02/14/2022","cd":"2023-05-05","lat":12.364318,"lon":125.237464,"sm":562,"fm":562,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bangon","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7468},{"i":9365,"cid":"23MB0076","pid":"P00721463MN","t":"Construction of Concrete Revetment, Buayan River, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":51144987.94,"abc":51145000.0,"fy":"2023","sd":"04/11/2023","cd":"2024-03-13","lat":6.113588,"lon":125.240915,"sm":578,"fm":578,"tm":578,"am":18,"md":0.06,"ls":"boundary","ww":"Buayan","wn":"Buayan River","wd":0.04,"wp":[6.11376,125.24061],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7469},{"i":9366,"cid":"24ME0070","pid":"P00835802MN","t":"Construction of Flood Control Structure along Barangay Maribulan, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96445530.38,"abc":96500000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-10-21","lat":6.11459,"lon":125.24277,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maribulan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7470},{"i":9367,"cid":"22ME0031","pid":"P00620090MN","t":"Construction of Malandag Flood Control, Malungon, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALUNGON (SARANGANI)","deo":"Sarangani District Engineering Office","co":"HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY","c":96464665.61,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-05-05","lat":6.3087,"lon":125.24617,"sm":903,"fm":903,"tm":903,"am":903,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7471},{"i":9368,"cid":"22LB0374","pid":"P00633926MN","t":"Rehabilitation of Drainage at Barangay Ma-a, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":28517829.2,"abc":29400000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-10-29","lat":7.085261,"lon":125.583201,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ma-a","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7472},{"i":9369,"cid":"22LC0097","pid":"P00630604MN","t":"Construction of Dike along Locutan Bridge to Mactan Channel Down to Tuganay River, Carmen, Davao del Norte","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/17/2022","cd":"2023-05-03","lat":7.400861,"lon":125.672058,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Mactan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7473},{"i":9370,"cid":"23LI0028","pid":"P00721439MN","t":"Construction of Revetment Along Manat River (Upstream and Downstream) leading to Agusan River at Bankeruhan Sur to Bankeruhan Norte, Montevista, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":57896600.0,"abc":57900000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-09-10","lat":7.731912,"lon":125.997216,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.02,"wp":[7.73175,125.99728],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9387,9467],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23LI0026 to 23LI0029) cover the same site, together worth PHP 192,994,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":462},{"i":9371,"cid":"22NH0058","pid":"P00630652MN","t":"Construction of Box Culvert, Barangay Madreliño, Cortes, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CORTES (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"SURIGAO LA SUERTE CORPORATION","c":6011284.2,"abc":6011320.0,"fy":"2022","sd":"08/15/2022","cd":"2023-02-08","lat":9.241111,"lon":126.173333,"sm":460,"fm":460,"tm":460,"am":460,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Madreliño","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7474},{"i":9372,"cid":"22LB0123","pid":"P00620166MN","t":"Construction of Seawall at Bucana, Sta. 0+000 - Sta. 0+400, Brgy. Lasang, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-09-04","lat":7.253267,"lon":125.672077,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lasang","len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7475},{"i":9373,"cid":"23N00018","pid":"P00721350MN","t":"Construction of San Antonio Flood Control, Barangay San Antonio, Madrid, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"MADRID (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"HAPPY ALL3 BUILDERS CORPORATION / TRIPARCO DEVELOPMENT CORPORATION","c":109044905.4,"abc":109045000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-07-10","lat":9.257261,"lon":125.9983,"sm":858,"fm":858,"tm":858,"am":858,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"San Antonio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7476},{"i":9374,"cid":"24NH0067","pid":"P00835814MN","t":"Construction of Seawall at Barangay Matho, Cortes, Surigao del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CORTES (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ST. TIMOTHY CONSTRUCTION CORPORATION","c":48249389.19,"abc":48250000.0,"fy":"2024","sd":"06/28/2024","cd":"2025-02-06","lat":9.163349,"lon":126.178006,"sm":460,"fm":460,"tm":460,"am":460,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matho","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7477},{"i":9375,"cid":"23ME0048","pid":"P00734406MN","t":"Construction of Flood Control Structure, Brgy. Maribulan, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"BETTER WORK CONSTRUCTION / 3 K'S INDUSTRIAL MAINTENANCE AND SERVICES, INC.","c":49499127.67,"abc":49500000.0,"fy":"2023","sd":"04/03/2023","cd":"2024-05-02","lat":6.11445,"lon":125.24784,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maribulan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7478},{"i":9376,"cid":"22KB0031","pid":"P00620119MN","t":"Construction of Revetment, Downstream and Upstream of Lanapan Bridge along Lanapan Creek, Quezon, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"ER SALAC BUILDERS CORPORATION","c":23519362.67,"abc":23520000.0,"fy":"2022","sd":"02/17/2022","cd":"2022-11-13","lat":7.609673,"lon":125.110442,"sm":1189,"fm":1189,"tm":1189,"am":1189,"md":0.0,"ls":"inside","ww":"Lanapan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7479},{"i":9377,"cid":"22NH0015","pid":"P00630657MN","t":"Construction of Seawall, Barangay Matho, Cortes, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CORTES (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"SURIGAO LA SUERTE CORPORATION","c":15288477.5,"abc":19600000.0,"fy":"2022","sd":"08/03/2022","cd":"2023-03-03","lat":9.16285,"lon":126.178845,"sm":460,"fm":460,"tm":460,"am":460,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Matho","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7480},{"i":9378,"cid":"23MB0080","pid":"P00721465MN","t":"Construction of Concrete Revetment, Upper Sinawal Bridge, Sinawal River, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"RUCS KONSULT & CONSTRUCTION SERVICES / SALMEGA BUILDERS","c":51144998.16,"abc":51145000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-08-27","lat":6.130222,"lon":125.110575,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.01,"wp":[6.13031,125.11068],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7481},{"i":9379,"cid":"24ME0062","pid":"P00820099MN","t":"Construction of Maribulan Flood Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"RFP BUILDERS CONSTRUCTION AND SUPPLIES CORPORATION / REYDAN BUILDERS","c":96499688.84,"abc":96500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-07-01","lat":6.11745,"lon":125.249917,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7482},{"i":9380,"cid":"22LE0035","pid":"P00620063MN","t":"Construction of Concrete Revetment, Lawa, Sta. 0+000 - Sta. 2+000, Don Marcelino, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"DON MARCELINO (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-10","lat":6.206997,"lon":125.674921,"sm":527,"fm":527,"tm":527,"am":527,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7483},{"i":9381,"cid":"22LA0148","pid":"P00620368MN","t":"Construction of Revetment along Golden Valley Creek, Mabini Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MABINI (DOÑA ALICIA) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"THEORBIA'S CONSTRUCTION SUPPLIES AND ENGINEERING SERVICES","c":19599088.71,"abc":19599959.18,"fy":"2022","sd":"03/29/2022","cd":"2022-12-17","lat":7.245585,"lon":125.998555,"sm":845,"fm":845,"tm":null,"am":1097,"md":2.23,"ls":"adjacent","ww":"Golden Valley","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7484},{"i":9382,"cid":"23N00019","pid":"P00721349MN","t":"Construction of Union Flood Control, Barangay Union, Madrid, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"MADRID (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":109044970.0,"abc":109045000.0,"fy":"2023","sd":"04/24/2023","cd":"2024-06-06","lat":9.265886,"lon":126.0015,"sm":858,"fm":858,"tm":858,"am":858,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Union","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7485},{"i":9383,"cid":"22LA0045","pid":"P00620269MN","t":"Construction of Revetment along Manat River (Up- stream and Down Stream) leading to Agusan River at Prk1C, 1B, 1A, 7, 8 and Manat Bridge, Sta. 15+780 - Sta. 16+170 (LS), Brgy. Poblacion, Montevista, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":48999898.13,"abc":48999976.61,"fy":"2022","sd":"02/15/2022","cd":"2022-11-05","lat":7.709119,"lon":126.003389,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.02,"wp":[7.70923,126.00358],"wst":"matched","br":"Poblacion","len":390.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7486},{"i":9384,"cid":"23N00103","pid":"P00721338MN","t":"Construction of Bank Protection along Solibao River Upstream, Agusan del Sur, Caraga","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"CM TAN CONSTRUCTION","c":144749601.4,"abc":144750000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-03-27","lat":8.373792,"lon":126.005042,"sm":1220,"fm":1220,"tm":null,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.17,"wp":[8.37247,126.00581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7487},{"i":9385,"cid":"23N00115","pid":"P00721335MN","t":"Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION","c":144749857.1,"abc":144750000.0,"fy":"2023","sd":"09/18/2023","cd":"2024-11-26","lat":8.948517,"lon":125.583881,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Antongalon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7488},{"i":9386,"cid":"23L00035","pid":"P00721437MN","t":"Construction of Dike and Drainage Canal along Barangay Kinamayan to Tuganay River, Sto.Tomas, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"SANTO TOMAS (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":77177147.0,"abc":77200000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-10-15","lat":7.500424,"lon":125.678388,"sm":1420,"fm":1420,"tm":1420,"am":1420,"md":0.0,"ls":"inside","ww":"Tuganay","wn":"Tuganay River","wd":5.05,"wp":[7.47073,125.64366],"wst":"matched","br":"Kinamayan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.58,"value":5.05,"text":"The title names Tuganay, which OpenStreetMap maps through the stated municipality, but the pin is 5.0 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":306},{"i":9387,"cid":"23LI0026","pid":"P00721277MN","t":"Construction of Revetment Along Manat River (Upstream and Downstream) leading to Agusan River at Prk1C, 1B, 1A, 7, 8 and Manat Bridge Poblacion, Montevista, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"NEN BUILDERS AND DEVELOPMENT SERVICES CORPORATION","c":57898265.04,"abc":57900000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-08-14","lat":7.692871,"lon":126.005119,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.04,"wp":[7.69288,126.00546],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9370,9467],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23LI0026 to 23LI0029) cover the same site, together worth PHP 192,994,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":463},{"i":9388,"cid":"22ME0070","pid":"P00620091MN","t":"Construction of Maribulan River Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":96408812.01,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-05-04","lat":6.11455,"lon":125.250158,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":"Maribulan","wn":"Maribulan River","wd":0.02,"wp":[6.11462,125.25001],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7489},{"i":9389,"cid":"22NG0034","pid":"P00630638MN","t":"Construction of Flood Control Structure along Tagana-an River, Tagana-an, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"TAGANA-AN (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"C.V. CONSTRUCTION & DEVELOPMENT","c":48508680.35,"abc":49000000.0,"fy":"2022","sd":"04/01/2022","cd":"2022-12-12","lat":9.693744,"lon":125.583892,"sm":1510,"fm":1510,"tm":1510,"am":1510,"md":0.0,"ls":"inside","ww":"Tagana-an","wn":"Tagana-an River","wd":0.02,"wp":[9.69388,125.58407],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7490},{"i":9390,"cid":"22MB0023","pid":"P00630529MN","t":"Construction of Revetment along Sinawal River, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":88424895.91,"abc":91675000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-09-17","lat":6.129722,"lon":125.111111,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.03,"wp":[6.12999,125.11118],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7491},{"i":9391,"cid":"24L00167","pid":"P00833568MN","t":"Construction of Drainage Structure, Barangay New Pandan, Panabo City, Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"PANABO CITY (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4949927.64,"abc":4950000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-09-23","lat":7.2927,"lon":125.6804,"sm":410,"fm":410,"tm":410,"am":410,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"New Pandan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7492},{"i":9392,"cid":"21NH0051","pid":"P00522135MN","t":"Construction of Telaje Flood Control, Tandag City, Surigao Del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"City of Tandag","deo":"Surigao del Sur 1st District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC.","c":77199953.75,"abc":77200000.0,"fy":"2021","sd":"03/16/2021","cd":"2022-10-06","lat":9.074025,"lon":126.188748,"sm":430,"fm":null,"tm":430,"am":430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7493},{"i":9393,"cid":"22NC0041","pid":"P00620347MN","t":"Construction of Flood Control Structures along Solibao River Protecting Solibao Bridge, Rosario, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"CM TAN CONSTRUCTION","c":57899988.14,"abc":57900000.0,"fy":"2022","sd":"06/30/2022","cd":"2023-03-30","lat":8.373033,"lon":126.006119,"sm":1220,"fm":1220,"tm":1220,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.03,"wp":[8.37284,126.00631],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7494},{"i":9394,"cid":"22N00112","pid":"P00620105MN","t":"Construction of Revetment along Telaje River, Brgy. Dagocdoc, Sta. 0+000.00 - Sta. 0+058.7, Sta. 0+071.6 - Sta. 0+460.20, Sta. 0+460.20 - Sta. 0+496.00, Tandag City, Surigao Del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF TANDAG (CAPITAL) (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC.","c":101324948.6,"abc":101325000.0,"fy":"2022","sd":"11/29/2022","cd":"2024-05-08","lat":9.077483,"lon":126.191108,"sm":430,"fm":430,"tm":430,"am":430,"md":0.0,"ls":"inside","ww":"Telaje","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Dagocdoc","len":483.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7495},{"i":9395,"cid":"24LE0020","pid":"P00820069MN","t":"Construction of Concrete Revetment, Lapuan Flood Control, Don Marcelino, Davao Occidental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"DON MARCELINO (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"SCP CONSTRUCTION","c":116555947.6,"abc":116566210.0,"fy":"2024","sd":"02/26/2024","cd":"2024-10-22","lat":6.160847,"lon":125.681269,"sm":527,"fm":527,"tm":527,"am":527,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7496},{"i":9396,"cid":"22KB0083","pid":"P00630497MN","t":"Construction of Revetment, Downstream and Upstream of Manuto Bridge (B01380MN) along Bukidnon - Davao City Road, Bukidnon","w":"Construction of Revetment","rg":"Region X","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-04","lat":7.703149,"lon":125.111256,"sm":1189,"fm":1189,"tm":null,"am":1189,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7497},{"i":9397,"cid":"23NE0009","pid":"P00721396MN","t":"Construction of Flood Control Structure at Lecing Br., Barangay Navarro, Tubajon, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"TUBAJON (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"BAMBOE CONSTRUCTION","c":4897988.93,"abc":4900000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-05-31","lat":10.291388,"lon":125.584166,"sm":1588,"fm":1588,"tm":1588,"am":1588,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Navarro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7498},{"i":9398,"cid":"23LI0023","pid":"P00721278MN","t":"Construction of Concrete Revetment along Batutu River leading to Manat River (Junction), Barangay New Visayas, Montevista, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":67549999.8,"abc":67550000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-12-20","lat":7.686491,"lon":126.006511,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"New Visayas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7499},{"i":9399,"cid":"24LD0012","pid":"P00820173MN","t":"Construction of Padada RIS River Bank Protection Dike at Main Dam, Hagonoy, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"R.C. MELGAZO BUILDERS","c":14700000.0,"abc":14700000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-06-13","lat":6.674205,"lon":125.263625,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Padada RIS","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7500},{"i":9400,"cid":"22LE0074","pid":"P00634139MN","t":"Construction of Concrete Revetment/Dike or Flood Control (Phase1) along the Existing Bridge Connecting Barangay North Lamidan and Barangay South Lamidan, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"DON MARCELINO (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49490002.98,"abc":49500000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-09-20","lat":6.086508,"lon":125.682039,"sm":527,"fm":527,"tm":null,"am":527,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"North Lamidan","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7501},{"i":9401,"cid":"21NH0040","pid":"P00522133MN","t":"Construction of Tandag Flood Control, Brgy. Dagocdoc, Tandag City, Surigao Del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"City of Tandag","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":72293424.04,"abc":74027080.0,"fy":"2021","sd":"03/04/2021","cd":"2022-08-29","lat":9.07871,"lon":126.1948,"sm":430,"fm":null,"tm":430,"am":430,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dagocdoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7502},{"i":9402,"cid":"22LB0375","pid":"P00633927MN","t":"Rehabilitation of Drainage at Purok 25, Peoples Village, Barangay Maa, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"VIBRANIUM BUILDERS CORPORATION","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-01-11","lat":7.089664,"lon":125.585088,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Maa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7503},{"i":9403,"cid":"23KK0069","pid":"P00721536MN","t":"Construction of Revetment at Anakan Bridge (Abutment A and B), Gingoog City, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72375000.0,"abc":72375000.0,"fy":"2023","sd":"04/25/2023","cd":"2024-03-01","lat":8.826563,"lon":125.11354,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7504},{"i":9404,"cid":"22LA0129","pid":"P00630767MN","t":"Construction of Concrete Revetment along Batutu River leading to Manat River (Junction), Barangay New Visayas, Montevista, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":39199816.62,"abc":39199820.16,"fy":"2022","sd":"03/18/2022","cd":"2022-11-12","lat":7.684536,"lon":126.007268,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"New Visayas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7505},{"i":9405,"cid":"23LE0020","pid":"P00721280MN","t":"Construction of Concrete Revetment, Lawa Flood Control, Don Marcelino, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"DON MARCELINO (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC.","c":77189414.06,"abc":77200000.0,"fy":"2023","sd":"03/16/2023","cd":"2023-10-04","lat":6.19941,"lon":125.684678,"sm":527,"fm":527,"tm":527,"am":527,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7506},{"i":9406,"cid":"23N00102","pid":"P00721339MN","t":"Construction of Bank Protection along Solibao River Downstream, Agusan del Sur, Caraga","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"CM TAN CONSTRUCTION","c":144749195.2,"abc":144750000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-03-27","lat":8.375336,"lon":126.007378,"sm":1220,"fm":1220,"tm":null,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.17,"wp":[8.37397,126.00806],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7507},{"i":9407,"cid":"22NC0044","pid":"P00634149MN","t":"Construction of Flood Mitigation Structure, Solibao River Flood Control, Rosario, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":49499997.17,"abc":49500000.0,"fy":"2022","sd":"06/30/2022","cd":"2023-05-01","lat":8.3739,"lon":126.00777,"sm":1220,"fm":1220,"tm":1220,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.01,"wp":[8.37383,126.00781],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7508},{"i":9408,"cid":"23NH0051","pid":"P00734007MN","t":"Construction of Flood Control, Barangay Dagocdoc, Tandag City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF TANDAG (CAPITAL) (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ROWIE'S CONSTRUCTION / JARGON CONSTRUCTION & SUPPLY","c":96499030.26,"abc":96500000.0,"fy":"2023","sd":"04/17/2023","cd":"2024-02-27","lat":9.081242,"lon":126.195306,"sm":430,"fm":430,"tm":430,"am":430,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dagocdoc","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7509},{"i":9409,"cid":"22N00107","pid":"P00620103MN","t":"Construction of Flood Mitigation Structure along NRJ Tagcatong-Vinapor Road, Sta. 0+000.00 - Sta. 0+424.15, Carmen, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CARMEN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":120624636.4,"abc":120625000.0,"fy":"2022","sd":"08/25/2022","cd":"2023-06-20","lat":9.006277,"lon":125.26364,"sm":341,"fm":341,"tm":341,"am":341,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":424.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7510},{"i":9410,"cid":"24NF0038","pid":"P00836198MN","t":"Construction of Slope Protection Structure along Jct. San Benito-Sta. Monica Road, San Benito, Surigao Del Norte","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SAN BENITO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":39499723.17,"abc":39600000.0,"fy":"2024","sd":"04/05/2024","cd":"2025-01-17","lat":9.96788,"lon":126.0121,"sm":1260,"fm":1260,"tm":1260,"am":1260,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7511},{"i":9411,"cid":"22MC0062","pid":"P00632611MN","t":"Construction of Flood Control Dike along Kabacan River at Poblacion, Magpet, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":9900000.0,"abc":9900000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-11-04","lat":7.11543,"lon":125.115389,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.11575,125.1156],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7512},{"i":9412,"cid":"23MB0075","pid":"P00721464MN","t":"Construction of Concrete Revetment along Sinawal River, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":86847861.53,"abc":86850000.0,"fy":"2023","sd":"03/30/2023","cd":"2024-03-03","lat":6.129936,"lon":125.115781,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.01,"wp":[6.12999,125.11582],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7513},{"i":9413,"cid":"23NH0041","pid":"P00734010MN","t":"Construction of Bongtud Seawall, Tandag City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF TANDAG (CAPITAL) (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC.","c":57895510.38,"abc":57900000.0,"fy":"2023","sd":"04/17/2023","cd":"2023-12-05","lat":9.083698,"lon":126.196983,"sm":430,"fm":430,"tm":430,"am":430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7514},{"i":9414,"cid":"24L00168","pid":"P00833569MN","t":"Construction of Drainage Structure, Barangay Santo Nino, Panabo City, Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"PANABO CITY (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4949981.72,"abc":4950000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-12-26","lat":7.3044,"lon":125.6849,"sm":410,"fm":410,"tm":410,"am":410,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Santo Nino","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7515},{"i":9415,"cid":"22LB0029","pid":"P00620073MN","t":"Construction of Flood Mitigation Structure along Maa Creek, Sta. 0+487 - Sta. 0+937, Don Julian Rodriguez Ave Section, Left Bank Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"ARCINUE COMM'L CORPORATION / MINDALIFI CONSTRUCTION AND SUPPLY","c":82025000.0,"abc":82025000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-12-07","lat":7.07823,"lon":125.586678,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Maa","wn":"Ma-a Creek","wd":1.23,"wp":[7.08802,125.58147],"wst":"matched","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7516},{"i":9416,"cid":"22LD0035","pid":"P00620217MN","t":"Construction of Concrete Revetment along Padada-Mainit River, Downstream MASALAM Bridge Section, Hagonoy, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":77606265.0,"abc":77606265.0,"fy":"2022","sd":"02/18/2022","cd":"2022-10-08","lat":6.671299,"lon":125.264061,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7517},{"i":9417,"cid":"22NC0049","pid":"P00633907MN","t":"Desilting of Solibao River (Phase I), Barangay Libuac & Barangay Poblacion, Rosario, Agusan del Sur","w":"Construction of Waterway","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ROSARIO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ARQ BUILDERS / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":96499999.5,"abc":96500000.0,"fy":"2022","sd":"10/19/2022","cd":"2023-08-20","lat":8.3957,"lon":126.01334,"sm":1220,"fm":1220,"tm":1220,"am":1220,"md":0.0,"ls":"inside","ww":"Solibao","wn":"Solibao River","wd":0.93,"wp":[8.38768,126.01085],"wst":"matched","br":"Libuac","len":null,"ph":"Phase I","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7518},{"i":9418,"cid":"21NE0037","pid":"P00522278MN","t":"Improvement of Cantujan River Navarro - Malinao River Basin, Brgy. Navarro, Tubajon, Dinagat Islands","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"Tubajon","deo":"Dinagat Islands District Engineering Office","co":"LYCS BUILDERS AND TRADING","c":9799935.19,"abc":9800000.0,"fy":"2021","sd":"03/16/2021","cd":"2022-07-13","lat":10.280424,"lon":125.586961,"sm":1588,"fm":null,"tm":1588,"am":1588,"md":0.0,"ls":"inside","ww":"Cantujan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Navarro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7519},{"i":9419,"cid":"22MC0063","pid":"P00620346MN","t":"Construction of Flood Control along Kabacan River at Purok Rico, Brgy. Poblacion, Magpet, Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-12-04","lat":7.115039,"lon":125.116067,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.11539,125.11622],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7520},{"i":9420,"cid":"22LE0034","pid":"P00620062MN","t":"Construction of Concrete Revetment, Lapuan, Sta. 0+000 - Sta. 2+000, Don Marcelino, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"DON MARCELINO (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-10","lat":6.152737,"lon":125.68842,"sm":527,"fm":527,"tm":527,"am":527,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7521},{"i":9421,"cid":"22N00111","pid":"P00620100MN","t":"Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment \"A\" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+305.098, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":100347111.5,"abc":100360000.0,"fy":"2022","sd":"07/08/2022","cd":"2023-09-30","lat":8.753276,"lon":126.206666,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Hubo","wn":"Hubo River","wd":0.18,"wp":[8.75274,126.20818],"wst":"matched","br":"Buhisan","len":305.1,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7522},{"i":9422,"cid":"22LG0029","pid":"P00620176MN","t":"Construction of Drainage Structure Along Batasan Creek, Sta. 0+000 - Sta. 1+440, Brgy. Bagumbayan, Lupon, Davao Oriental","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"RMT CORPORATION (FORMERLY: MELROBE BUILDERS & CONSTRUCTION SUPPLIES) / ABU CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-24","lat":6.9058,"lon":126.01348,"sm":833,"fm":833,"tm":833,"am":833,"md":0.0,"ls":"inside","ww":"Batasan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagumbayan","len":1440.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7523},{"i":9423,"cid":"22MC0050","pid":"P00620236MN","t":"Construction of Flood Control Dike along Kabacan River L/S, Sta. 50 + 860 - 51 + 240, Brgy. Doles, Magpet, North Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":50254305.0,"abc":50254304.98,"fy":"2022","sd":"03/29/2022","cd":"2022-12-13","lat":7.115889,"lon":125.116743,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.07,"wp":[7.11527,125.11658],"wst":"matched","br":"Doles","len":380.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7524},{"i":9424,"cid":"23KB0125","pid":"P00734018MN","t":"Construction of Spillway, Kipilas going to Sitio Paraiso, Brgy. Kipilas, Kitaotao, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"KITAOTAO (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"REVILO CONSTRUCTION","c":4893715.86,"abc":4900000.0,"fy":"2023","sd":"05/18/2023","cd":"2023-10-14","lat":7.52055,"lon":125.264344,"sm":713,"fm":713,"tm":713,"am":713,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Kipilas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7525},{"i":9425,"cid":"22N00109","pid":"P00620252MN","t":"Construction of Flood Control Structure (Downstream Right Side of Mahayahay Bridge), Brgy. Mahayahay, Sta. 0+000.00 - Sta. 0+500.00, Kitcharao, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"KITCHARAO (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":115799987.6,"abc":115800000.0,"fy":"2022","sd":"03/18/2022","cd":"2022-11-12","lat":9.442237,"lon":125.588868,"sm":714,"fm":714,"tm":714,"am":714,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahayahay","len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7526},{"i":9426,"cid":"22IL0135","pid":"P00633028VS","t":"Construction of Cat-iwing Flood Control Structure, Hinundayan, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"HINUNDAYAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"LANOY CONSTRUCTION","c":20580000.0,"abc":20580000.0,"fy":"2022","sd":"04/06/2022","cd":"2022-12-03","lat":10.311013,"lon":125.26486,"sm":625,"fm":625,"tm":625,"am":625,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7527},{"i":9427,"cid":"23N00139","pid":"P00721491MN","t":"Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment ''B'' Upstream, Brgy. Buhisan, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":102280040.2,"abc":102290000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-02-27","lat":8.753275,"lon":126.2067,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Hubo","wn":"Hubo River","wd":0.17,"wp":[8.75274,126.20818],"wst":"matched","br":"Buhisan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7528},{"i":9428,"cid":"22NB0007","pid":"P00620189MN","t":"Construction of Bank Protection along Wawa River (Mahagkot Section) Downstream, Phase II, Sta. 0+080.00 - Sta. 0+184.80, Ezperanza, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":14699469.14,"abc":14700000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-05-02","lat":8.679677,"lon":125.68907,"sm":553,"fm":553,"tm":553,"am":553,"md":0.0,"ls":"inside","ww":"Wawa","wn":"Wawa River","wd":0.25,"wp":[8.67968,125.69138],"wst":"matched","br":null,"len":104.8,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7529},{"i":9429,"cid":"22LB0293","pid":"P00620370MN","t":"Construction of Revetment along Davao River, Barangay 8-A, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"ARCINUE COMM'L CORPORATION / MINDALIFI CONSTRUCTION AND SUPPLY","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-05-02","lat":7.075253,"lon":125.590251,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.07559,125.59002],"wst":"matched","br":"8-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7530},{"i":9430,"cid":"22II0020","pid":"P00620340VS","t":"Construction of Palapag Flood Control Structure and Drainage System, Palapag River Basin, Palapag, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PALAPAG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JUPA CONSTRUCTION","c":48748724.4,"abc":48999843.2,"fy":"2022","sd":"02/11/2022","cd":"2023-03-15","lat":12.55259,"lon":125.116941,"sm":1066,"fm":1066,"tm":1066,"am":1066,"md":0.0,"ls":"inside","ww":"Palapag","wn":"Palapag River","wd":0.04,"wp":[12.55269,125.11726],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7531},{"i":9431,"cid":"22LA0084","pid":"P00630768MN","t":"Construction of Flood Mitigation Structure along Batutu River leading to Manat River, Barangay Banag-Banag, Montevista, Davao de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONTEVISTA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":48999930.84,"abc":48999963.5,"fy":"2022","sd":"02/23/2022","cd":"2023-02-20","lat":7.672372,"lon":126.022168,"sm":989,"fm":989,"tm":989,"am":989,"md":0.0,"ls":"inside","ww":"Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Banag-Banag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7532},{"i":9432,"cid":"24LD0007","pid":"P00820316MN","t":"Construction of Revetment along Padada-Mainit River, Left Side Downstream, MASALAM Bridge Section, Hagonoy, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":89177580.0,"abc":89177580.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-22","lat":6.670571,"lon":125.265233,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7533},{"i":9433,"cid":"24NH0041","pid":"P00820368MN","t":"Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge, Upstream, Barangay Buhisan, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":96499216.69,"abc":96500000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-08-30","lat":8.75305,"lon":126.2082,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Hubo","wn":"Hubo River","wd":0.02,"wp":[8.75293,126.20835],"wst":"matched","br":"Buhisan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7534},{"i":9434,"cid":"23LD0041","pid":"P00721646MN","t":"Construction of Flood Mitigation Structure, Padada-Mainit River (Tanwalang Section), Sulop, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"03/21/2023","cd":"2023-12-01","lat":6.629087,"lon":125.269621,"sm":1488,"fm":1488,"tm":1488,"am":1488,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7535},{"i":9435,"cid":"23MB0078","pid":"P00721462MN","t":"Construction of Concrete Revetment, Makar River, Barangay Labangal, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":65136465.86,"abc":65137500.0,"fy":"2023","sd":"02/21/2023","cd":"2023-04-24","lat":6.086202,"lon":125.117007,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Makar","wn":"Makar River","wd":0.06,"wp":[6.08568,125.11719],"wst":"matched","br":"Labangal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7536},{"i":9436,"cid":"21LB0305","pid":"P00550460MN","t":"Construction of Drainage System leading to Tupaz Outfall, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY) / ARCINUE COMM'L CORPORATION","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-11-26","lat":7.082739,"lon":125.591411,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7537},{"i":9437,"cid":"23L00053","pid":"P00721445MN","t":"Construction of Revetment along Padada-Mainit River (Tanwalang Section) Package A, Sulop, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":91490150.4,"abc":91675000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-10","lat":6.62109,"lon":125.269661,"sm":1488,"fm":1488,"tm":1488,"am":1488,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7538},{"i":9438,"cid":"22IL0062","pid":"P00620230VS","t":"Construction of Lawigan Flood Control along Jct Himay-angan - Silago - Abuyog - Bdry. Road, St. Bernard, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SAINT BERNARD (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2023-12-14","lat":10.303506,"lon":125.117165,"sm":1238,"fm":1238,"tm":null,"am":1238,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7539},{"i":9439,"cid":"22LA0102","pid":"P00620076MN","t":"Construction of Revetment along Manat River (Downstream), Sta. 19+110 - Sta. 19+900 (LS), Sta. 20+115.73 - Sta. 21+007.73 (RS), Sta. 21+028.00 - Sta. 21+500.00 (RS), Brgy. Mainit, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":67549498.88,"abc":67549998.87,"fy":"2022","sd":"04/04/2022","cd":"2022-12-16","lat":7.523536,"lon":126.025251,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.01,"wp":[7.52346,126.02534],"wst":"matched","br":"Mainit","len":2154.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7540},{"i":9440,"cid":"22NH0092","pid":"P00634154MN","t":"Construction of Flood Control and Drainage System at Barangay Rosario, Tandag City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF TANDAG (CAPITAL) (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ROWIE'S CONSTRUCTION","c":14848228.87,"abc":14850000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-05-03","lat":9.050833,"lon":126.209166,"sm":430,"fm":430,"tm":430,"am":430,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Rosario","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7541},{"i":9441,"cid":"22NB0026","pid":"P00620194MN","t":"Construction of Bank Protection (Raising of Grades, protecting the National Road) along Bayugan-Esperanza Road, Crossing Luna Section, Sta. 0+000.00 - Sta. 0+105.00, Esperanza, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":26459609.73,"abc":26460000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-03-09","lat":8.673532,"lon":125.689542,"sm":553,"fm":553,"tm":553,"am":553,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":105.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7542},{"i":9442,"cid":"23II0016","pid":"P00721587VS","t":"Construction of Palapag Flood Control Structure and Drainage System, Palapag River Basin, Palapag, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PALAPAG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"MCU CONSTRUCTION","c":54932000.0,"abc":55487426.05,"fy":"2023","sd":"02/07/2023","cd":"2023-10-24","lat":12.550138,"lon":125.117541,"sm":1066,"fm":1066,"tm":1066,"am":1066,"md":0.0,"ls":"inside","ww":"Palapag","wn":"Palapag River","wd":0.03,"wp":[12.55018,125.11784],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7543},{"i":9443,"cid":"22LD0101","pid":"P00644824MN","t":"Construction of Concrete Revetment along Padada-Mainit River (Protecting Padada - Kiblawan-Malungon -By Pass Road), Sulop, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"REYDAN BUILDERS","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/21/2023","cd":"2023-07-24","lat":6.624435,"lon":125.270956,"sm":1488,"fm":1488,"tm":1488,"am":1488,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7544},{"i":9444,"cid":"21N00141","pid":"P00522333MN","t":"Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road  (Crossing  Luna Section), Agusan del Sur, Package 1","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":101324994.0,"abc":101325000.0,"fy":"2021","sd":"04/20/2022","cd":"2022-12-15","lat":8.673329,"lon":125.689847,"sm":null,"fm":null,"tm":null,"am":553,"md":null,"ls":"unknown","ww":"Wawa","wn":"Wawa River","wd":0.07,"wp":[8.67385,125.69012],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":166},{"i":9445,"cid":"25NH0035","pid":"P00935921MN","t":"Construction of Drainage Structure, Barangay Victoria, Tago, Surigao del Sur","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CRJ CONST AND DEVELOPMENT INC","c":4934983.08,"abc":4950000.0,"fy":"2025","sd":"02/19/2025","cd":"2025-04-23","lat":9.035,"lon":126.21028,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Victoria","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7545},{"i":9446,"cid":"22LA0052","pid":"P00630765MN","t":"Construction of Revetment along Manat River leading to Agusan River at Inambatan Bridge (Upstream), Brgy. Olaycon, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"TYER ONE CONSTRUCTION CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67549125.73,"abc":67549987.53,"fy":"2022","sd":"02/23/2022","cd":"2023-01-23","lat":7.792278,"lon":126.029931,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.1,"wp":[7.79136,126.02984],"wst":"matched","br":"Olaycon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7546},{"i":9447,"cid":"24II0043","pid":"P00820416VS","t":"Construction of Palapag Flood Control Structure, Palapag River Basin, Palapag, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PALAPAG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"JCL CONSTRUCTION AND SUPPLY","c":48988827.59,"abc":48999981.57,"fy":"2024","sd":"04/25/2024","cd":"2024-12-08","lat":12.547939,"lon":125.117625,"sm":1066,"fm":1066,"tm":1066,"am":1066,"md":0.0,"ls":"inside","ww":"Palapag","wn":"Palapag River","wd":0.02,"wp":[12.5479,125.11783],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7547},{"i":9448,"cid":"21LB0018","pid":"P00522362MN","t":"Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy 9-A, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"07/12/2021","cd":"2023-08-30","lat":7.076661,"lon":125.592413,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.05,"wp":[7.07698,125.59212],"wst":"matched","br":"9-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7548},{"i":9449,"cid":"23I00125","pid":"P00733710VS","t":"Construction of Seawall, Brgy. Pinut-an, San Ricardo, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SAN RICARDO (SOUTHERN LEYTE)","deo":"Southern Leyte 2nd District Engineering Office","co":"TUBIGAN BUILDERS","c":9875201.19,"abc":9900000.0,"fy":"2023","sd":"07/31/2023","cd":"2023-10-17","lat":10.002086,"lon":125.271148,"sm":1356,"fm":1356,"tm":1356,"am":1356,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pinut-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7549},{"i":9450,"cid":"23N00140","pid":"P00721492MN","t":"Rehabilitation of Flood Control Structure along Tago River, Abutment A, San Miguel, Surigao del Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN MIGUEL (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":60794962.84,"abc":60795000.0,"fy":"2023","sd":"06/26/2023","cd":"2024-06-12","lat":8.940258,"lon":126.031,"sm":1337,"fm":1337,"tm":1337,"am":1337,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.05,"wp":[8.93986,126.03082],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7550},{"i":9451,"cid":"22LC0033","pid":"P00620085MN","t":"Rehabilitation of Tuganay-Libuganon and Mag Creek Protection Dikes, Tuganay, Davao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"AKN CONSTRUCTION CORPORATION","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-12-16","lat":7.470531,"lon":125.694783,"sm":339,"fm":339,"tm":null,"am":231,"md":5.94,"ls":"outside","ww":"Mag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.76,"value":5.94,"text":"The pin is 5.9 km outside Carmen, Davao del Norte, the nearest municipality the record claims. It falls in Braulio E. Dujali, Davao del Norte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":204},{"i":9452,"cid":"23N00144","pid":"P00732100MN","t":"Construction of Flood Mitigation Structure along Matanda River, Barangay Salvacion, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"HAPPY ALL3 BUILDERS CORPORATION / TRIPARCO DEVELOPMENT CORPORATION","c":106149909.7,"abc":106150000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-05-11","lat":8.710906,"lon":126.2112,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Matanda","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Salvacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7551},{"i":9453,"cid":"22LB0370","pid":"P00633922MN","t":"Construction of Drainage System at Purok 6, 7 and 10, Barangay 8-A, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"JB DANTE BUILDERS & SUPPLY","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-10-11","lat":7.07611,"lon":125.594447,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"8-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7552},{"i":9454,"cid":"24KK0036","pid":"P00820257MN","t":"Construction of Flood Control Structure along Gingoog River, Package 1, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96495215.41,"abc":96500000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-10-10","lat":8.823249,"lon":125.117925,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gingoog","wn":"Gingoog River","wd":0.03,"wp":[8.82307,125.11809],"wst":"matched","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7553},{"i":9455,"cid":"21N00096","pid":"P00522339MN","t":"Rehabilitation of Flood Control Structure along Tago River (Package 2), San Miguel, Surigao del Sur","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"San Miguel","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":110009989.7,"abc":110010000.0,"fy":"2021","sd":"08/06/2021","cd":"2023-04-12","lat":8.93923,"lon":126.0324,"sm":1337,"fm":null,"tm":1337,"am":1337,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.03,"wp":[8.93899,126.03221],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7554},{"i":9456,"cid":"22LD0036","pid":"P00630511MN","t":"Construction of Flood Control Structure along Padada-Mainit River (Lapulabao Section), Hagonoy, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES / LEDCORE CONSTRUCTION AND DEVELOPMENT CORP,","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-11-08","lat":6.664284,"lon":125.272085,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7555},{"i":9457,"cid":"22NC0042","pid":"P00634147MN","t":"Construction of Agusan River Flood Control, Sta. Josefa, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SANTA JOSEFA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":49499995.15,"abc":49500000.0,"fy":"2022","sd":"06/30/2022","cd":"2023-06-05","lat":7.989347,"lon":126.033306,"sm":1387,"fm":1387,"tm":1387,"am":1387,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.05,"wp":[7.98894,126.03304],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7556},{"i":9458,"cid":"22NB0055","pid":"P00522334MN","t":"Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road  (Crossing  Luna Section), Agusan del Sur, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":96486483.84,"abc":96500000.0,"fy":"2021","sd":"05/30/2022","cd":"2023-04-25","lat":8.672657,"lon":125.694981,"sm":null,"fm":null,"tm":null,"am":553,"md":null,"ls":"unknown","ww":"Wawa","wn":"Wawa River","wd":0.08,"wp":[8.6731,125.69441],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":167},{"i":9459,"cid":"22LG0046","pid":"P00620071MN","t":"Construction of Flood Mitigation Structure along Lanca-Luban-Cabuaya Creek, Sta. 0+000 - Sta. 1+800, Mati City, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CITY OF MATI (CAPITAL) (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":94474095.6,"abc":96500000.0,"fy":"2022","sd":"02/28/2022","cd":"2023-01-22","lat":6.50587,"lon":126.21143,"sm":405,"fm":405,"tm":405,"am":405,"md":0.0,"ls":"inside","ww":"Lanca-Luban-Cabuaya","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":1800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7557},{"i":9460,"cid":"20LB0292","pid":"P00444617MN","t":"Construction of Revetment along Davao River, Sta. 3+171 to Sta. 3+440, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":28950000.0,"abc":28950000.0,"fy":"2020","sd":"12/17/2020","cd":"2023-03-23","lat":7.070704,"lon":125.596507,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.07039,125.59629],"wst":"matched","br":null,"len":269.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7558},{"i":9461,"cid":"24KK0037","pid":"P00820258MN","t":"Construction of Flood Control Structure along Gingoog River, Package 2, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":96499464.0,"abc":96500000.0,"fy":"2024","sd":"04/25/2024","cd":"2024-12-09","lat":8.820884,"lon":125.117979,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gingoog","wn":"Gingoog River","wd":0.03,"wp":[8.82099,125.11823],"wst":"matched","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7559},{"i":9462,"cid":"20LB0292","pid":"P00444617MN","t":"Construction of Revetment along Davao River, Sta. 3+171 to Sta. 3+440, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":28950000.0,"abc":28950000.0,"fy":"2021","sd":"12/17/2020","cd":"2023-03-23","lat":7.070704,"lon":125.596507,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.07039,125.59629],"wst":"matched","br":null,"len":269.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7560},{"i":9463,"cid":"21NC0076","pid":"P00522267MN","t":"Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 160, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 2nd District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"08/09/2021","cd":"2022-07-14","lat":7.98849,"lon":126.03465,"sm":null,"fm":null,"tm":null,"am":1387,"md":null,"ls":"unknown","ww":"Agusan","wn":"Agusan River","wd":0.05,"wp":[7.98808,126.03439],"wst":"matched","br":null,"len":160.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":168},{"i":9464,"cid":"22IB0029","pid":"P00620182VS","t":"Rehabilitation/Improvement of Flood Control Structure Protecting National Road along Jct. Bunavista-Lawaan-Marabut Rd, K0955+220-K0955+293 (R/S) ; 955+345-995+555 (R/S), Brgy. Guinob-an, Lawaan, Eastern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"LAWAAN (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"J.A. DEVELOPERS AND ENGINEERS","c":29399997.3,"abc":29399991.21,"fy":"2022","sd":"04/05/2022","cd":"2022-08-20","lat":11.138701,"lon":125.272154,"sm":764,"fm":764,"tm":764,"am":764,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Guinob-an","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7561},{"i":9465,"cid":"20LB0291","pid":"P00444616MN","t":"Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY","c":28950000.0,"abc":28950000.0,"fy":"2020","sd":"12/17/2020","cd":"2022-08-22","lat":7.069738,"lon":125.596571,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.07002,125.59682],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7562},{"i":9466,"cid":"22K00344","pid":"P00634119MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 2, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":145375675.4,"abc":148500000.0,"fy":"2022","sd":"08/15/2022","cd":"2024-03-03","lat":7.934589,"lon":125.118821,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7563},{"i":9467,"cid":"23LI0029","pid":"P00721438MN","t":"Construction of Revetment along Manat River leading to Agusan River at Inambatan Bridge (Downstream), Olaycon, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":77199435.22,"abc":77200000.0,"fy":"2023","sd":"02/16/2023","cd":"2023-10-18","lat":7.801796,"lon":126.03576,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.01,"wp":[7.80186,126.03581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9387,9370],"cl":[],"L":"field","s":38,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (23LI0026 to 23LI0029) cover the same site, together worth PHP 192,994,300.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":402},{"i":9468,"cid":"22NH0046","pid":"P00630562MN","t":"Construction of Shoreline Protection of Ten Coastal Barangays, San Agustin, Surigao Del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":96499747.18,"abc":96500000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-09-26","lat":8.7403,"lon":126.2189,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7564},{"i":9469,"cid":"23N00100","pid":"P00721483MN","t":"Construction of Bank Protection along Wawa River, Poblacion, Sibagat, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SIBAGAT (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":137512439.7,"abc":137512500.0,"fy":"2023","sd":"04/20/2023","cd":"2024-06-13","lat":8.826111,"lon":125.6953,"sm":1442,"fm":1442,"tm":1442,"am":1442,"md":0.0,"ls":"inside","ww":"Wawa","wn":"Wawa River","wd":0.2,"wp":[8.82583,125.69708],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7565},{"i":9470,"cid":"20LB0291","pid":"P00444616MN","t":"Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY","c":28950000.0,"abc":28950000.0,"fy":"2021","sd":"12/17/2020","cd":"2022-08-22","lat":7.069738,"lon":125.596571,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.07002,125.59682],"wst":"matched","br":null,"len":375.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7566},{"i":9471,"cid":"20LB0247","pid":"P00444646MN","t":"Construction of Revetment along Davao River, Generoso Bridge Upstream Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2020","sd":"12/13/2020","cd":"2022-08-18","lat":7.069148,"lon":125.597233,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06942,125.59748],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7567},{"i":9472,"cid":"22NB0054","pid":"P00620354MN","t":"Construction of Bank Protection along Wawa River, Poblacion Sibagat Section, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SIBAGAT (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":48968540.68,"abc":49000000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-09-07","lat":8.822549,"lon":125.696614,"sm":1442,"fm":1442,"tm":null,"am":1442,"md":0.0,"ls":"inside","ww":"Wawa","wn":"Wawa River","wd":0.05,"wp":[8.82259,125.69706],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7568},{"i":9473,"cid":"22LA0049","pid":"P00630764MN","t":"Construction of Revetment along Manat River leading to Agusan River at Inambatan Bridge (Downstream), Brgy. Olaycon, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67549964.47,"abc":67549969.15,"fy":"2022","sd":"02/23/2022","cd":"2022-11-18","lat":7.79709,"lon":126.037198,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Manat","wn":"Manat River","wd":0.11,"wp":[7.79666,126.03806],"wst":"matched","br":"Olaycon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7569},{"i":9474,"cid":"24ME0038","pid":"P00820200MN","t":"Construction of Ladol Flood Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"SALMEGA BUILDERS","c":48996335.51,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-05-15","lat":6.087833,"lon":125.2722,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7570},{"i":9475,"cid":"23NH0061","pid":"P00732098MN","t":"Construction of Flood Mitigation Structure along Seboron River, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":48999935.28,"abc":49000000.0,"fy":"2023","sd":"05/10/2023","cd":"2024-05-22","lat":8.740206,"lon":126.21912,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Seboron","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7571},{"i":9476,"cid":"24LD0006","pid":"P00820307MN","t":"Construction of Flood Mitigation Structure along Padada-Mainit River, Lapulabao Upstream Section, Hagonoy, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":89178545.0,"abc":89178545.0,"fy":"2024","sd":"02/22/2024","cd":"2024-09-17","lat":6.664446,"lon":125.272471,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7572},{"i":9477,"cid":"20LB0247","pid":"P00444646MN","t":"Construction of Revetment along Davao River, Generoso Bridge Upstream Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION","c":29400000.0,"abc":29400000.0,"fy":"2021","sd":"12/13/2020","cd":"2022-08-18","lat":7.069148,"lon":125.597233,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06942,125.59748],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7573},{"i":9478,"cid":"22MC0061","pid":"P00620383MN","t":"Construction of Kabacan River Flood Control, Barangay Doles, Magpet, Cotabato, Sta. 51 + 575 to Sta. 51 + 802.27","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"03/29/2022","cd":"2023-09-04","lat":7.115477,"lon":125.1196,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.11522,125.11938],"wst":"matched","br":"Doles","len":227.3,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7574},{"i":9479,"cid":"23NC0011","pid":"P00721518MN","t":"Construction of bank protection along Agusan River (Protecting Sta. Josefa-Pulang Lupa Tertiary Road), Phase II, Sta. Josefa, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SANTA JOSEFA (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":48999999.99,"abc":49000000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-09","lat":7.98533,"lon":126.03867,"sm":1387,"fm":1387,"tm":1387,"am":1387,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.07,"wp":[7.98503,126.03812],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7575},{"i":9480,"cid":"24NH0007","pid":"P00820213MN","t":"Construction of Tago RIS Protection Works along Balisong River, Tago, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"MELROSHEAN CONSTRUCTION CORPORATION","c":29399932.61,"abc":29400000.0,"fy":"2024","sd":"06/28/2024","cd":"2025-01-09","lat":8.952067,"lon":126.230327,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Balisong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7576},{"i":9481,"cid":"22NG0011","pid":"P00630651MN","t":"Construction of Wave Breaker along the Coastlines of Barangays Alambique and Ipil, Gigaquit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GIGAQUIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48409915.17,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-10-24","lat":9.59758,"lon":125.69684,"sm":582,"fm":582,"tm":582,"am":582,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Alambique","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7577},{"i":9482,"cid":"23L00054","pid":"P00721446MN","t":"Construction of Revetment along Padada-Mainit River (Tanwalang Section) Package B, Sulop, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":101150000.0,"abc":101325000.0,"fy":"2023","sd":"03/20/2023","cd":"2023-12-10","lat":6.658868,"lon":125.276954,"sm":1488,"fm":1488,"tm":1488,"am":1049,"md":0.82,"ls":"boundary","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7578},{"i":9483,"cid":"22LB0361","pid":"P00633913MN","t":"Construction of Drainage at Purok 9, Duha Subd., Barangay 10-A, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"MICAH CONSTRUCTION & SUPPLY","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-08-12","lat":7.087074,"lon":125.59725,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"10-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7579},{"i":9484,"cid":"23NF0019","pid":"P00721401MN","t":"Construction of Flood Control Structure, Nuevo Campo, San Benito, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SAN BENITO (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"DQT BUILDERS AND SUPPLY","c":29395023.19,"abc":29400000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-11-16","lat":9.94345,"lon":126.03908,"sm":1260,"fm":1260,"tm":1260,"am":1260,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7580},{"i":9485,"cid":"22NG0028","pid":"P00630633MN","t":"Construction of Baoy River Flood Control Structure, Barangay San Isidro, Gigaquit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GIGAQUIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"CHARLZ CONSTRUCTION, INC.","c":39195621.87,"abc":39200000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-11-21","lat":9.55907,"lon":125.69881,"sm":582,"fm":582,"tm":582,"am":582,"md":0.0,"ls":"inside","ww":"Baoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Isidro","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7581},{"i":9486,"cid":"23NH0056","pid":"P00734006MN","t":"Construction of Flood Control Structure along Tago River Basin, Barangay Purisima, Tago, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":96499332.54,"abc":96500000.0,"fy":"2023","sd":"04/28/2023","cd":"2024-02-16","lat":9.015883,"lon":126.230833,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.68,"wp":[9.01361,126.23658],"wst":"matched","br":"Purisima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7582},{"i":9487,"cid":"24L00110","pid":"P00820314MN","t":"Construction of Revetment along Padada-Mainit River (Tanwalang Section), Package C, Sulop, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":91500000.0,"abc":91675000.0,"fy":"2024","sd":"04/11/2024","cd":"2025-01-20","lat":6.659319,"lon":125.277806,"sm":1488,"fm":1488,"tm":1488,"am":1049,"md":0.82,"ls":"boundary","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package C","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7583},{"i":9488,"cid":"23I00144","pid":"P00721920VS","t":"Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"LILOAN (SOUTHERN LEYTE)","deo":"Southern Leyte 2nd District Engineering Office","co":"JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY)","c":48248051.51,"abc":48250000.0,"fy":"2023","sd":"09/11/2023","cd":"2024-03-24","lat":10.136996,"lon":125.120088,"sm":791,"fm":791,"tm":null,"am":791,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7584},{"i":9489,"cid":"24NE0025","pid":"P00820930MN","t":"Construction of Flood Control Structure at Tag-iho Bridge I, Tag-abaca, Basilisa, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"BASILISA (RIZAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)","c":57193333.19,"abc":57900000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-09-29","lat":10.060228,"lon":125.598719,"sm":175,"fm":175,"tm":175,"am":175,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7585},{"i":9490,"cid":"22LA0121","pid":"P00620078MN","t":"Construction of Revetment along Pagtulian River, Sta. 0+000 - Sta. 0+750 (BS), Bukal, Nabunturan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NABUNTURAN (CAPITAL) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / DOUBLE J CONSTRUCTION AND SUPPLY","c":57215519.61,"abc":57215576.41,"fy":"2022","sd":"03/28/2022","cd":"2022-11-29","lat":7.47107,"lon":126.040956,"sm":1001,"fm":1001,"tm":1001,"am":1001,"md":0.0,"ls":"inside","ww":"Pagtulian","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7586},{"i":9491,"cid":"22NH0016","pid":"P00620254MN","t":"Construction of Flood Control Structure along Tago River Basin, Brgy. Purisima, Sta. 0+000.00 - Sta. 0+346.00, Tago, Surigao Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":86849162.75,"abc":86850000.0,"fy":"2022","sd":"08/08/2022","cd":"2023-05-22","lat":9.014405,"lon":126.233495,"sm":1516,"fm":1516,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.35,"wp":[9.01342,126.2365],"wst":"matched","br":"Purisima","len":346.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7587},{"i":9492,"cid":"24L00111","pid":"P00820315MN","t":"Construction of Revetment along Padada-Mainit River (Tanwalang Section), Package D, Sulop, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":90271251.25,"abc":91675000.0,"fy":"2024","sd":"04/16/2024","cd":"2025-01-25","lat":6.659842,"lon":125.278294,"sm":1488,"fm":1488,"tm":1488,"am":1049,"md":0.85,"ls":"boundary","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package D","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7588},{"i":9493,"cid":"23M00018","pid":"P00721453MN","t":"Construction of Flood Control Dike along Kabacan River L/S, Sta. 51 + 575 - Sta. 51 + 938.64, Barangay Doles, Magpet, North Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"MARCUS CONSTRUCTION & SUPPLY","c":77173242.35,"abc":77200000.0,"fy":"2023","sd":"10/24/2023","cd":"2024-06-21","lat":7.113774,"lon":125.121191,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Kabacan","wn":"Kabacan River","wd":0.04,"wp":[7.11359,125.12093],"wst":"matched","br":"Doles","len":363.6,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7589},{"i":9494,"cid":"22LB0295","pid":"P00620372MN","t":"Construction of Revetment along Davao River, Crocodile Park Section, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":77200000.0,"abc":77200000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-07-03","lat":7.101208,"lon":125.598959,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.03,"wp":[7.10142,125.59876],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7590},{"i":9495,"cid":"22LA0050","pid":"P00620226MN","t":"Construction of Revetment along Batutu River Leading to Agusan River, Sta. 5+400 - Sta. 6+100 (LS), Brgy. Siocon, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":78225730.03,"abc":78225734.03,"fy":"2022","sd":"02/28/2022","cd":"2022-12-20","lat":7.652863,"lon":126.041156,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Siocon","len":700.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7591},{"i":9496,"cid":"23N00150","pid":"P00732099MN","t":"Construction of Flood Mitigation Structure along Sto. Niño River protecting Sto. Niño Bridge, San Agustin, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"SAN AGUSTIN (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":106149442.1,"abc":106150000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-04-04","lat":8.767531,"lon":126.2349,"sm":1251,"fm":1251,"tm":1251,"am":1251,"md":0.0,"ls":"inside","ww":"Sto. Niño","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7592},{"i":9497,"cid":"24LD0081","pid":"P00821193MN","t":"Construction of Flood Control Structure along Padada-Mainit River (Tanwalang-Upper Katipunan Section 1), Sulop, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"05/02/2024","cd":"2024-12-28","lat":6.6438,"lon":125.27896,"sm":1488,"fm":1488,"tm":1488,"am":1488,"md":0.0,"ls":"inside","ww":"Padada-Mainit","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Section 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7593},{"i":9498,"cid":"22LC0193","pid":"P00634122MN","t":"Construction of Concrete Revetment including Pump Station, Sadpudon Creek, Carmen, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"WERR CORPORATION INTERNATIONAL / METRO GEAR CONSTRUCTION CORP.","c":99000000.0,"abc":99000000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-12-01","lat":7.348911,"lon":125.703761,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Sadpudon","wn":"Sadpudon Creek","wd":0.0,"wp":[7.34895,125.70378],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7594},{"i":9499,"cid":"22NE0038","pid":"P00631116MN","t":"Construction of Flood Control Structure, Barangay Tag-abaca, Basilisa, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"BASILISA (RIZAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"ALGAMON CONSTRUCTION CORPORATION (FORMERLY: ALGAMON CONSTRUCTION)","c":29699901.51,"abc":29700000.0,"fy":"2022","sd":"03/10/2022","cd":"2023-03-13","lat":10.05879,"lon":125.600131,"sm":175,"fm":175,"tm":175,"am":175,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tag-abaca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7595},{"i":9500,"cid":"21LA0134","pid":"P00550484MN","t":"Construction/Revetment of Piasusuan River, Brgy. Napnapan, Pantukan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"Pantukan","deo":"Davao de Oro 1st District Engineering Office","co":"SNN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION","c":5914418.11,"abc":5939949.36,"fy":"2021","sd":"03/24/2022","cd":"2022-07-21","lat":7.197956,"lon":126.041906,"sm":1097,"fm":null,"tm":1097,"am":1097,"md":0.0,"ls":"inside","ww":"Piasusuan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Napnapan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7596},{"i":9501,"cid":"23MB0128","pid":"P00734410MN","t":"Construction of Floodway from Road 7 to Existing Creek, Brgy. Fatima, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION)","c":19798637.03,"abc":19800000.0,"fy":"2023","sd":"05/25/2023","cd":"2023-12-01","lat":6.065445,"lon":125.121313,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Existing","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Fatima","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7597},{"i":9502,"cid":"20NH0061","pid":"P00444660MN","t":"Construction of Revetment along Tago River, Tago, Surigao del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"Tago","deo":"Surigao del Sur 1st District Engineering Office","co":"JMT CONSTRUCTION","c":48999951.28,"abc":49000000.0,"fy":"2020","sd":"12/08/2020","cd":"2022-07-22","lat":9.01443,"lon":126.23546,"sm":1516,"fm":null,"tm":1516,"am":1516,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.15,"wp":[9.01394,126.23671],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7598},{"i":9503,"cid":"22LD0037","pid":"P00630523MN","t":"Construction of Revetment along Padada - Mainit River (Tanwalang Section), Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"KIBLAWAN (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-02-07","lat":6.64613,"lon":125.279714,"sm":710,"fm":710,"tm":null,"am":710,"md":0.0,"ls":"inside","ww":"Mainit","wn":"Mainit River","wd":0.02,"wp":[6.64615,125.27951],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7599},{"i":9504,"cid":"24NI0051","pid":"P00835815MN","t":"Construction of Bank Revetment along Bislig River (Burboanan Section), Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":96499535.19,"abc":96500000.0,"fy":"2024","sd":"04/11/2024","cd":"2025-03-31","lat":8.18122,"lon":126.25588,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Bislig","wn":"Bislig River","wd":0.02,"wp":[8.18137,126.2558],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7600},{"i":9505,"cid":"24NI0061","pid":"P00836199MN","t":"Construction of Bank Revetment, Brgy. Tambis, Barobo, Surigao del Sur (Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"BAROBO (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":49498336.47,"abc":49500000.0,"fy":"2024","sd":"04/15/2024","cd":"2025-01-30","lat":8.53863,"lon":126.04331,"sm":167,"fm":167,"tm":167,"am":167,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tambis","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7601},{"i":9506,"cid":"22LC0034","pid":"P00620218MN","t":"Construction of Concrete Revetment, Tagum - Libuganon River Basin, Maniki Section, Sta. 5+350 - Sta. 5+730, Kapalong, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"KAPALONG (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"TAGUM BUILDERS CONTRACTORS CORP. (FORMERLY: TAGUM","c":86849997.25,"abc":86850000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-11-23","lat":7.569408,"lon":125.707614,"sm":697,"fm":697,"tm":697,"am":697,"md":0.0,"ls":"inside","ww":"Libuganon","wn":"Libuganon River","wd":0.09,"wp":[7.56996,125.70703],"wst":"matched","br":null,"len":380.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7602},{"i":9507,"cid":"22N00094","pid":"P00630541MN","t":"Construction of Flood Control Structures at Weighbridge Section, Package 1, Ampayon, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"RAMISES CONSTRUCTION / EQUI-PARCO CONSTRUCTION COMPANY","c":139924964.4,"abc":139925000.0,"fy":"2022","sd":"04/20/2022","cd":"2024-07-31","lat":8.959694,"lon":125.60042,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7603},{"i":9508,"cid":"23ME0043","pid":"P00734033MN","t":"Construction of Latian Flood Control Structure, Alabel, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"SHEPPERD CONSTRUCTION AND SUPPLY","c":48999483.45,"abc":49000000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-11-22","lat":6.1794,"lon":125.28137,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7604},{"i":9509,"cid":"23LG0002","pid":"P00721503MN","t":"Construction of Flood Mitigation Structure along Sumlog River (Cocornon Section), Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-12-03","lat":6.915167,"lon":126.044997,"sm":833,"fm":833,"tm":833,"am":833,"md":0.0,"ls":"inside","ww":"Sumlog","wn":"Sumlog River","wd":0.1,"wp":[6.91501,126.04591],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7605},{"i":9510,"cid":"23N00153","pid":"P00721481MN","t":"Construction of Bank Revetment along Bislig River (Burboanan Section), Bislig City, Surigao del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":110974996.6,"abc":110975000.0,"fy":"2023","sd":"03/27/2023","cd":"2024-01-21","lat":8.184036,"lon":126.2571,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Bislig","wn":"Bislig River","wd":0.16,"wp":[8.18305,126.25813],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7606},{"i":9511,"cid":"22K00350","pid":"P00634120MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 3, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":145162014.7,"abc":148500000.0,"fy":"2022","sd":"08/15/2022","cd":"2024-03-03","lat":7.938882,"lon":125.123183,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7607},{"i":9512,"cid":"24ME0005","pid":"P00820202MN","t":"Construction of Molo Creek Flood Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"YURUSA CONSTRUCTION & DEVELOPMENT CORP. / EDCL CONSTRUCTION AND SUPPLY","c":48889616.12,"abc":49000000.0,"fy":"2024","sd":"02/13/2024","cd":"2024-07-29","lat":6.10625,"lon":125.28386,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":"Molo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7608},{"i":9513,"cid":"24NI0058","pid":"P00835816MN","t":"Construction of Bank Revetment along Bislig River (Pamanlinan Section), Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":96499134.76,"abc":96500000.0,"fy":"2024","sd":"04/15/2024","cd":"2025-05-02","lat":8.20617,"lon":126.26847,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Bislig","wn":"Bislig River","wd":1.76,"wp":[8.19061,126.27162],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7609},{"i":9514,"cid":"22NB0032","pid":"P00620193MN","t":"Construction of Revetment along Wawa River, Wawa Bridge Section, Agusan del Sur, Sta. 0+000.00 - Sta. 0+123.80, Bayugan City, Agusan del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ADFIL CORPORATION","c":26459996.92,"abc":26460000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-02-17","lat":8.80304,"lon":125.70802,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":"Wawa","wn":"Wawa River","wd":0.05,"wp":[8.80336,125.70771],"wst":"matched","br":null,"len":123.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7610},{"i":9515,"cid":"23II0040","pid":"P00733323VS","t":"Construction of Flood Control Structure, Barangay Cagamutan, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"GAMAY (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":24254200.0,"abc":24499202.26,"fy":"2023","sd":"04/19/2023","cd":"2024-11-07","lat":12.355104,"lon":125.285295,"sm":562,"fm":562,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cagamutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7611},{"i":9516,"cid":"22K00348","pid":"P00634121MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 4, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":145429609.5,"abc":148500000.0,"fy":"2022","sd":"08/15/2022","cd":"2024-03-03","lat":7.93709,"lon":125.123373,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7612},{"i":9517,"cid":"23II0051","pid":"P00733761VS","t":"Concreting of Flood Control Carriageway in Barangay Cagamutan, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"GAMAY (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":9893850.8,"abc":9899328.51,"fy":"2023","sd":"04/19/2023","cd":"2024-06-04","lat":12.35509,"lon":125.2853,"sm":562,"fm":562,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cagamutan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7613},{"i":9518,"cid":"21NI0041","pid":"P00522290MN","t":"Construction of Bank Revetment along Bislig River (Pamanlinan Section), Bislig City, Surigao del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"City of Bislig","deo":"Surigao del Sur 2nd District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":45569089.0,"abc":45569089.25,"fy":"2021","sd":"03/26/2021","cd":"2022-09-15","lat":8.20843,"lon":126.26929,"sm":372,"fm":null,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Bislig","wn":"Bislig River","wd":1.99,"wp":[8.19075,126.2723],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7614},{"i":9519,"cid":"22LB0298","pid":"P00620376MN","t":"Rehabilitation of Revetment along Davao River, Purok 6, Platinum St. San Rafael Village Section, Barangay 10-A, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96500000.0,"abc":96500000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-03-06","lat":7.086409,"lon":125.600602,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.03,"wp":[7.08668,125.60051],"wst":"matched","br":"10-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7615},{"i":9520,"cid":"22NG0025","pid":"P00630537MN","t":"Construction of Flood Control (Baoy River) Purok 4, Barangay Magallanes, Claver, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"CLAVER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"CHARLZ CONSTRUCTION, INC.","c":57899995.35,"abc":57900000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-11-21","lat":9.5745,"lon":125.70897,"sm":441,"fm":441,"tm":441,"am":441,"md":0.0,"ls":"inside","ww":"Baoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Magallanes","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7616},{"i":9521,"cid":"22K00343","pid":"P00634118MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 1, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":96920496.22,"abc":99000000.0,"fy":"2022","sd":"08/15/2022","cd":"2024-01-28","lat":7.941016,"lon":125.125273,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7617},{"i":9522,"cid":"22LG0007","pid":"P00630609MN","t":"Construction of Flood Mitigation Structure along Sumlog River (Barangay Cocornon Section) Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-09-11","lat":6.922439,"lon":126.046114,"sm":833,"fm":833,"tm":null,"am":833,"md":0.0,"ls":"inside","ww":"Sumlog","wn":"Sumlog River","wd":0.07,"wp":[6.92247,126.04546],"wst":"matched","br":"Cocornon Section","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7618},{"i":9523,"cid":"22K00140","pid":"P00620216MN","t":"Construction of Revetment along Gingoog River (Brgys. Santiago, Daan Lungsod), (Phase 4), Gingoog City, Misamis Oriental","w":"Construction of Revetment","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":93318046.4,"abc":96500000.0,"fy":"2022","sd":"03/21/2022","cd":"2023-06-13","lat":8.829759,"lon":125.125954,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gingoog","wn":"Gingoog River","wd":0.02,"wp":[8.8299,125.12588],"wst":"matched","br":null,"len":null,"ph":"Phase 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7619},{"i":9524,"cid":"22NH0088","pid":"P00630654MN","t":"Construction of River Control Structure at Daniog River, Barangay Gamuton, Lanuza, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LANUZA (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":29399993.12,"abc":29400000.0,"fy":"2022","sd":"08/15/2022","cd":"2023-04-13","lat":9.223333,"lon":126.047777,"sm":749,"fm":749,"tm":749,"am":749,"md":0.0,"ls":"inside","ww":"Daniog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Gamuton","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7620},{"i":9525,"cid":"22NG0033","pid":"P00630534MN","t":"Construction of Baoy River Control, Barangay Daywan, Claver, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"CLAVER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"CTB CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY : CTB ENGINEERING CONSTRUCTION) / CHARLZ CONSTRUCTION, INC.","c":56169526.72,"abc":57900000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-11-15","lat":9.55683,"lon":125.70911,"sm":441,"fm":441,"tm":441,"am":441,"md":0.0,"ls":"inside","ww":"Baoy","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Daywan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7621},{"i":9526,"cid":"20LB0037","pid":"P00420017MN","t":"Construction of Revetment along Davao River, Sta. 2+790 to Sta. 3+141, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":60296095.0,"abc":60296095.0,"fy":"2020","sd":"12/16/2020","cd":"2022-09-19","lat":7.06501,"lon":125.60138,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06538,125.6013],"wst":"matched","br":null,"len":351.0,"ph":null,"dup":[9528,9539],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 146,432,960.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":863},{"i":9527,"cid":"22NI0068","pid":"P00632321MN","t":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1484+255.50 - K1484+480, K1484+590 - K1484+652","w":"Rehabilitation / Major Repair of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LINGIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"DELPAR CONSTRUCTION & SUPPLIES","c":95311709.99,"abc":96500000.0,"fy":"2022","sd":"06/22/2022","cd":"2023-12-08","lat":8.107225,"lon":126.27587,"sm":798,"fm":798,"tm":null,"am":372,"md":5.23,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":49,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.74,"value":5.23,"text":"The pin is 5.2 km outside Lingig, Surigao del Sur, the nearest municipality the record claims. It falls in City of Bislig, Surigao del Sur.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":205},{"i":9528,"cid":"20LB0040","pid":"P00420021MN","t":"Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+473, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":86136865.0,"abc":86136865.0,"fy":"2020","sd":"12/16/2020","cd":"2022-11-22","lat":7.06501,"lon":125.60138,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06538,125.6013],"wst":"matched","br":null,"len":332.0,"ph":null,"dup":[9526,9534],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 146,432,960.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":821},{"i":9529,"cid":"21MB0006","pid":"P00522256MN","t":"Construction of  Concrete Revetment, Sinawal River, Barangay Apopong, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"General Santos City","deo":"South Cotabato 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48976421.12,"abc":49000000.0,"fy":"2021","sd":"03/08/2022","cd":"2023-01-06","lat":6.126342,"lon":125.126351,"sm":578,"fm":null,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.0,"wp":[6.12632,125.12634],"wst":"matched","br":"Apopong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7622},{"i":9530,"cid":"23KA0046","pid":"P00721550MN","t":"Construction of Flood Mitigation Structure along Bobonawan River, Brgy Cabulohan, Cabanglasan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CABANGLASAN (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":57900000.0,"abc":57900000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-10-23","lat":8.018121,"lon":125.289157,"sm":274,"fm":274,"tm":274,"am":274,"md":0.0,"ls":"inside","ww":"Bobonawan","wn":"Bobonawan River","wd":0.02,"wp":[8.01819,125.28898],"wst":"matched","br":"Cabulohan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7623},{"i":9531,"cid":"23NF0020","pid":"P00721628MN","t":"Construction of Flood Control Structure, Mabini, Sta. Monica, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SANTA MONICA (SAPAO) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"DUROS DEVELOPMENT CORP.","c":48998470.45,"abc":49500000.0,"fy":"2023","sd":"03/19/2023","cd":"2023-12-20","lat":9.96343,"lon":126.04803,"sm":1399,"fm":1399,"tm":1399,"am":1293,"md":0.88,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7624},{"i":9532,"cid":"22LG0005","pid":"P00620271MN","t":"Construction of Flood Mitigation Structure along Bitanagan River, Sta. 0+054 - Sta. 0+136, Sta. 0+057 - Sta. 0+232, Mati City, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CITY OF MATI (CAPITAL) (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"RAKKI CORPORATION","c":28518595.69,"abc":29400000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-10-16","lat":6.96897,"lon":126.27823,"sm":405,"fm":405,"tm":405,"am":405,"md":0.0,"ls":"inside","ww":"Bitanagan","wn":"Bitanagan River","wd":0.01,"wp":[6.96898,126.2783],"wst":"matched","br":null,"len":257.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7625},{"i":9533,"cid":"22LC0098","pid":"P00630605MN","t":"Construction of Dike along Sadpudon Creek, Carmen, Davao del Norte","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY)","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"03/25/2022","cd":"2023-01-19","lat":7.335411,"lon":125.713292,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Sadpudon","wn":"Sadpudon Creek","wd":0.59,"wp":[7.3407,125.71404],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7626},{"i":9534,"cid":"20LB0037","pid":"P00420017MN","t":"Construction of Revetment along Davao River, Sta. 2+790 to Sta. 3+141, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":60296095.0,"abc":60296095.0,"fy":"2021","sd":"12/16/2020","cd":"2022-09-19","lat":7.06501,"lon":125.60138,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06538,125.6013],"wst":"matched","br":null,"len":351.0,"ph":null,"dup":[9528,9539],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 146,432,960.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":864},{"i":9535,"cid":"23KK0058","pid":"P00721558MN","t":"Construction of Flood Control along Gingoog River (Downstream of Malubog Br.), Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":72374966.78,"abc":72375000.0,"fy":"2023","sd":"05/22/2023","cd":"2024-03-06","lat":8.832589,"lon":125.126517,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gingoog","wn":"Gingoog River","wd":0.04,"wp":[8.83226,125.12656],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7627},{"i":9536,"cid":"23NF0044","pid":"P00734422MN","t":"Construction of Drainage Canal, Dapa, Surigao del Norte (Phase II)","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"RADIAN CONSTRUCTION AND SUPPLY","c":4154118.08,"abc":4950000.0,"fy":"2023","sd":"08/30/2023","cd":"2024-01-22","lat":9.75906,"lon":126.04987,"sm":483,"fm":483,"tm":483,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7628},{"i":9537,"cid":"22LA0048","pid":"P00630759MN","t":"Construction of Revetment along Agusan River at Barangay Poblacion, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. / ABU CONSTRUCTION","c":96499845.28,"abc":96499862.66,"fy":"2022","sd":"02/23/2022","cd":"2023-04-02","lat":7.832824,"lon":126.050761,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.04,"wp":[7.83262,126.0511],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7629},{"i":9538,"cid":"23K00061","pid":"P00721261MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 5, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":113036569.7,"abc":115625000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-11-08","lat":7.940001,"lon":125.12653,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7630},{"i":9539,"cid":"20LB0040","pid":"P00420021MN","t":"Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+473, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RAKKI CORPORATION / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":86136865.0,"abc":86136865.0,"fy":"2021","sd":"12/16/2020","cd":"2022-11-22","lat":7.06501,"lon":125.60138,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.04,"wp":[7.06538,125.6013],"wst":"matched","br":null,"len":332.0,"ph":null,"dup":[9526,9534],"run":[],"cl":[],"L":"field","s":27,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":2,"text":"2 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 146,432,960.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":822},{"i":9540,"cid":"24N00123","pid":"P00820372MN","t":"Construction of Flood Control Structure Protecting Bagnan Br. along NRJ-Cumawas-Tinuy-an Falls Road, Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC.","c":123188026.7,"abc":123188040.0,"fy":"2024","sd":"03/01/2024","cd":"2024-11-18","lat":8.175769,"lon":126.284383,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7631},{"i":9541,"cid":"24ME0003","pid":"P00820098MN","t":"Construction of Latian Flood Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96499943.24,"abc":96500000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-12-11","lat":6.187728,"lon":125.290116,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7632},{"i":9542,"cid":"22NF0073","pid":"P00620301MN","t":"Construction of Dapa-Osmeña Flood Control Structure, Dapa, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"R26 CONSTRUCTION, INC.","c":19562161.77,"abc":19800000.0,"fy":"2022","sd":"03/24/2022","cd":"2022-10-19","lat":9.77224,"lon":126.05127,"sm":483,"fm":483,"tm":483,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7633},{"i":9543,"cid":"23LF0089","pid":"P00721272MN","t":"Construction of Revetment Protecting Benigno S. Aquino Jr. National Highway (Udiongan Section), Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"DBR CONSTRUCTION CORPORATION (FORMERLY: D.B. RAVELO CONSTRUCTION & SUPPLY) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":96499069.79,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-16","lat":7.731939,"lon":126.300975,"sm":354,"fm":354,"tm":null,"am":354,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7634},{"i":9544,"cid":"21LB0295","pid":"P00550552MN","t":"Construction of Drainage Structure, Eagle Street, Phase 2, Barangay Bucana, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2021","sd":"11/18/2021","cd":"2022-07-07","lat":7.052258,"lon":125.601596,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bucana","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7635},{"i":9545,"cid":"23ME0024","pid":"P00732494MN","t":"Construction of Flood Control and Approach Protection of Masagana Bridge, Alabel, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"KURDZ CONSTRUCTION","c":9899844.05,"abc":9900000.0,"fy":"2023","sd":"04/03/2023","cd":"2023-06-27","lat":6.099747,"lon":125.29052,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7636},{"i":9546,"cid":"22LC0094","pid":"P00630510MN","t":"Construction of Dike along Sadpudon Creek, Carmen, Brgy. Taba, Carmen, Davao del Norte","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-12-05","lat":7.336639,"lon":125.714372,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Sadpudon","wn":"Sadpudon Creek","wd":0.45,"wp":[7.3407,125.71404],"wst":"matched","br":"Taba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7637},{"i":9547,"cid":"23KK0080","pid":"P00721559MN","t":"Construction of Flood Control along Gingoog River (Downstream of Malubog Br.), Gingoog City, Misamis Oriental(Phase 2)","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":72374989.72,"abc":72375000.0,"fy":"2023","sd":"06/08/2023","cd":"2024-05-23","lat":8.836867,"lon":125.126597,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Gingoog","wn":"Gingoog River","wd":0.17,"wp":[8.83594,125.12539],"wst":"matched","br":null,"len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7638},{"i":9548,"cid":"22NF0044","pid":"P00630560MN","t":"Construction of Seawall, Barangay 1 and Barangay 2, Dapa, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP. / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":95534725.09,"abc":96500000.0,"fy":"2022","sd":"03/06/2022","cd":"2023-03-19","lat":9.7545,"lon":126.05217,"sm":483,"fm":483,"tm":483,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7639},{"i":9549,"cid":"22LF0034","pid":"P00630515MN","t":"Construction of Flood Mitigation Structure Protecting Benigno S. Aquino Jr. National Highway (Udiongan Section), Cateel, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY)","c":67547375.44,"abc":67550000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-11-08","lat":7.728051,"lon":126.301174,"sm":354,"fm":354,"tm":354,"am":354,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7640},{"i":9550,"cid":"23NE0028","pid":"P00721399MN","t":"Construction of Flood Control Structure at Tag-Iho Br. I, Barangay Tag-abaca, Basilisa, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"BASILISA (RIZAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"ALGAMON CONSTRUCTION CORPORATION (FORMERLY: ALGAMON CONSTRUCTION)","c":9794998.31,"abc":9800000.0,"fy":"2023","sd":"03/08/2023","cd":"2023-07-13","lat":10.058941,"lon":125.60195,"sm":175,"fm":175,"tm":175,"am":175,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tag-abaca","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7641},{"i":9551,"cid":"23L00042","pid":"P00721276MN","t":"Construction of Flood Control Structure including Pump Station at Purok 22, Barangay Ising, Sadpudon Creek, Carmen, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY / AARJG BUILDERS CORPORATION","c":86850000.0,"abc":86850000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-06-13","lat":7.353389,"lon":125.715766,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Sadpudon","wn":"Sadpudon Creek","wd":0.97,"wp":[7.34529,125.71235],"wst":"matched","br":"Ising","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7642},{"i":9552,"cid":"22N00132","pid":"P00630539MN","t":"Construction of Flood Control Mitigation Structure along Agusan River Basin Protecting Barangay Poblacion, Las Nieves, Package 1, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ADFIL CORPORATION","c":173699978.5,"abc":173700000.0,"fy":"2022","sd":"04/22/2022","cd":"2023-06-08","lat":8.732633,"lon":125.602583,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.22,"wp":[8.73069,125.60258],"wst":"matched","br":"Poblacion","len":null,"ph":"Package 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7643},{"i":9553,"cid":"23K00066","pid":"P00721237MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 7, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":184246728.2,"abc":188000000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-05-27","lat":7.942246,"lon":125.12752,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 7","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7644},{"i":9554,"cid":"23NF0037","pid":"P00734009MN","t":"Reconstruction/Rehabilitation of Drainage System Dapa, Surigao Del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":67049933.5,"abc":67550000.0,"fy":"2023","sd":"08/30/2023","cd":"2025-03-20","lat":9.75786,"lon":126.05224,"sm":483,"fm":483,"tm":null,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7645},{"i":9555,"cid":"24KA0032","pid":"P00820027MN","t":"Construction of Flood Mitigation Structure along Bobonawan River, barangay Cabulohan, Cabanglasan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CABANGLASAN (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":96499793.05,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2024-08-20","lat":8.015037,"lon":125.291554,"sm":274,"fm":274,"tm":274,"am":274,"md":0.0,"ls":"inside","ww":"Bobonawan","wn":"Bobonawan River","wd":0.1,"wp":[8.01517,125.29249],"wst":"matched","br":"Cabulohan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7646},{"i":9556,"cid":"24L00194","pid":"P00833288MN","t":"Construction of Concrete Revetment at Tagum-Libuganon River, Sto. Tomas, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"SANTO TOMAS (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY / AARJG BUILDERS CORPORATION","c":48250000.0,"abc":48250000.0,"fy":"2024","sd":"05/22/2024","cd":"2024-11-08","lat":7.533693,"lon":125.71749,"sm":1420,"fm":1420,"tm":1420,"am":1420,"md":0.0,"ls":"inside","ww":"Tagum-Libuganon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7647},{"i":9557,"cid":"23NI0054","pid":"P00721656MN","t":"Construction of Flood Mitigation Structure along Poblacion Bislig River, Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"CONCEPCION BASIC BUILDERS INC.","c":96499796.19,"abc":96500000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-08-23","lat":8.21725,"lon":126.31164,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Poblacion Bislig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7648},{"i":9558,"cid":"22NE0028","pid":"P00620195MN","t":"Construction of Flood Control Structure at Luna Br. Phase II, Sta. 0+000.00 - Sta. 0+317.05, San Jose, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"SAN JOSE (CAPITAL) (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)","c":35775817.5,"abc":35924840.0,"fy":"2022","sd":"03/01/2022","cd":"2023-11-13","lat":10.002652,"lon":125.604209,"sm":1304,"fm":1304,"tm":1304,"am":1304,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":317.1,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7649},{"i":9559,"cid":"24MC0038","pid":"P00820194MN","t":"Construction of Revetment along Bantac River Sta. 0+490 - Sta. 1+290 R/S, Barangay Bantac, Magpet, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"02/18/2024","cd":"2025-03-25","lat":7.112157,"lon":125.128684,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Bantac","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bantac","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7650},{"i":9560,"cid":"22NF0081","pid":"P00634151MN","t":"Construction of Embankment, Barangays 2 and 6 (Phase 2), Dapa, Surigao del Norte","w":"Embankment","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"MEGA MYKON BUILDERS","c":14767348.1,"abc":14850000.0,"fy":"2022","sd":"05/27/2022","cd":"2022-07-20","lat":9.754411,"lon":126.053483,"sm":483,"fm":483,"tm":483,"am":483,"md":0.04,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"2","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7651},{"i":9561,"cid":"24ME0078","pid":"P00835888MN","t":"Construction of Flood Control Structure, Barangay Lun Padidu, Malapatan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"ESCORR BUILDERS AND TRADERS, INC.","c":48995985.15,"abc":49000000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-10-28","lat":6.04601,"lon":125.29331,"sm":890,"fm":890,"tm":890,"am":18,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Lun Padidu","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7652},{"i":9562,"cid":"22NI0045","pid":"P00620259MN","t":"Construction/Rehabilitation of flood mitigation along Poblacion Bislig River, Sta. 0+000.00 - Sta. 0+127.00, Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"CONCEPCION BASIC BUILDERS INC.","c":62723880.33,"abc":62725000.0,"fy":"2022","sd":"03/14/2022","cd":"2023-03-17","lat":8.22039,"lon":126.31472,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":"Poblacion Bislig","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":127.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7653},{"i":9563,"cid":"23K00139","pid":"P00721238MN","t":"Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 8, Valencia City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF VALENCIA (BUKIDNON)","deo":"Bukidnon 3rd District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":183949115.0,"abc":188000000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-01-28","lat":7.94646,"lon":125.129019,"sm":435,"fm":435,"tm":435,"am":435,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 8","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7654},{"i":9564,"cid":"20LB0024","pid":"P00420006MN","t":"Construction of Revetment - Davao River Flood Control, Bolton Bridge Upstream, S.I.R New Matina Phase 1 Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":45080000.0,"abc":45080000.0,"fy":"2020","sd":"02/27/2020","cd":"2022-08-28","lat":7.05822,"lon":125.60433,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.05,"wp":[7.05816,125.60479],"wst":"matched","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7655},{"i":9565,"cid":"22NF0098","pid":"P00634150MN","t":"Construction of Drainage Structure, Barangay 3, 4, 5 and 8, Dapa, Surigao del Norte","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"MEGA MYKON BUILDERS","c":4892235.61,"abc":4950000.0,"fy":"2022","sd":"05/27/2022","cd":"2022-10-26","lat":9.75883,"lon":126.05371,"sm":483,"fm":483,"tm":483,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"3","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7656},{"i":9566,"cid":"23M00042","pid":"P00721585MN","t":"Construction of River Control, Package A, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"MRRM TRADING & CONSTRUCTION / SALMEGA BUILDERS","c":96499426.29,"abc":96500000.0,"fy":"2023","sd":"07/11/2023","cd":"2024-04-30","lat":6.100992,"lon":125.294292,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7657},{"i":9567,"cid":"23LF0083","pid":"P00721271MN","t":"Construction of Flood Mitigation Structure Protecting Benigno S. Aquino Jr. National Highway (Maglahus Section), Cateel Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":96499675.54,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-09-30","lat":7.753714,"lon":126.320831,"sm":354,"fm":354,"tm":null,"am":354,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7658},{"i":9568,"cid":"23N00099","pid":"P00721482MN","t":"Construction of Bank Protection along Agusan River (Dimasalang Section) San Luis, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN LUIS (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ARQ BUILDERS","c":137511331.6,"abc":137512500.0,"fy":"2023","sd":"03/27/2023","cd":"2024-04-06","lat":8.545356,"lon":125.7192,"sm":1322,"fm":1322,"tm":null,"am":1322,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.03,"wp":[8.54565,125.71921],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7659},{"i":9569,"cid":"24KA0142","pid":"P00835863MN","t":"Construction of Spillway, barangay Little Baguio, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"REFUGE CONSTRUCTION SERVICES","c":29400000.0,"abc":29400000.0,"fy":"2024","sd":"02/27/2024","cd":"2024-10-03","lat":7.91494,"lon":125.29559,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Little Baguio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7660},{"i":9570,"cid":"24MC0040","pid":"P00820196MN","t":"Construction of Revetment along Mabato River Sta. 2+800 - Sta. 3+110 L/S (Junction with Overflow bridge), Barangay Bantac, Magpet, Cotabato","w":"Construction of Revetment","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAGPET (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":49000000.0,"abc":49000000.0,"fy":"2024","sd":"04/17/2024","cd":"2025-03-20","lat":7.112974,"lon":125.130114,"sm":867,"fm":867,"tm":867,"am":867,"md":0.0,"ls":"inside","ww":"Mabato","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bantac","len":310.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7661},{"i":9571,"cid":"22LB0369","pid":"P00633921MN","t":"Construction of Drainage System at Purok 5, Ledesma Subd., Barangay 10-A, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"CJEP BUILDERS AND ENGINEERING SERVICES","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-08-24","lat":7.084805,"lon":125.604656,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"10-A","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7662},{"i":9572,"cid":"22LC0031","pid":"P00620067MN","t":"Construction of Flood Control Structure (Bank Protection) at Barangay Talomo, Sto. Tomas, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"SANTO TOMAS (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"02/24/2022","cd":"2023-12-19","lat":7.530189,"lon":125.720858,"sm":1420,"fm":1420,"tm":1420,"am":1420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Talomo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7663},{"i":9573,"cid":"23M00043","pid":"P00721586MN","t":"Construction of River Control, Package B, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON","c":115798238.9,"abc":115800000.0,"fy":"2023","sd":"08/18/2023","cd":"2024-07-03","lat":6.10275,"lon":125.295768,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package B","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7664},{"i":9574,"cid":"24KA0031","pid":"P00820042MN","t":"Construction of Flood Mitigation Structure in Barangay Laguitas, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION)","c":141855000.0,"abc":141750000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-03-25","lat":8.092756,"lon":125.131481,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Laguitas","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7665},{"i":9575,"cid":"24NF0017","pid":"P00820932MN","t":"Construction of Flood Mitigation Structure along Roxas to Sta. Monica Road, Libertad Bridge 2, Sta. Monica, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SANTA MONICA (SAPAO) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":72274740.23,"abc":72375000.0,"fy":"2024","sd":"02/16/2024","cd":"2025-05-15","lat":9.989483,"lon":126.054218,"sm":1399,"fm":1399,"tm":1399,"am":1399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7666},{"i":9576,"cid":"24LG0039","pid":"P00820182MN","t":"Construction of Flood Mitigation Structure, Barangay Mayo, Mati City, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CITY OF MATI (CAPITAL) (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"ECOMIXED CONSTRUCTION AND DEVELOPMENT CORPORATION","c":45949999.96,"abc":49000000.0,"fy":"2024","sd":"03/08/2024","cd":"2024-08-31","lat":7.006431,"lon":126.335822,"sm":405,"fm":405,"tm":405,"am":405,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7667},{"i":9577,"cid":"22K00150","pid":"P00620042MN","t":"Construction of Sea Wall, Brgy. Daan Lungsod, K0+000.00 - K0+183.00, Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / CHIU BUILDERS","c":74883766.56,"abc":77200000.0,"fy":"2022","sd":"06/29/2022","cd":"2023-05-24","lat":8.84013,"lon":125.131741,"sm":585,"fm":585,"tm":585,"am":585,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Daan Lungsod","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7668},{"i":9578,"cid":"21LB0017","pid":"P00522103MN","t":"Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+246 - Sta. 2+635)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"THREE W BUILDERS, INC.","c":67550000.0,"abc":67550000.0,"fy":"2021","sd":"09/06/2021","cd":"2022-12-13","lat":7.06334,"lon":125.605274,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.05,"wp":[7.06362,125.60564],"wst":"matched","br":null,"len":389.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7669},{"i":9579,"cid":"21II0022","pid":"P00521724VS","t":"Construction of Gamay Flood Control Structure and Drainage System, Gamay River Basin, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"Gamay","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":47299306.0,"abc":48999610.89,"fy":"2021","sd":"03/15/2021","cd":"2022-08-05","lat":12.384727,"lon":125.296618,"sm":562,"fm":null,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":"Gamay","wn":"Gamay River","wd":0.03,"wp":[12.38444,125.29657],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7670},{"i":9580,"cid":"24NF0016","pid":"P00820931MN","t":"Construction of Flood Mitigation Structure along Roxas to Sta. Monica Road, Libertad Bridge 1, Sta. Monica, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"SANTA MONICA (SAPAO) (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":72274865.65,"abc":72375000.0,"fy":"2024","sd":"02/16/2024","cd":"2025-05-21","lat":9.98536,"lon":126.05582,"sm":1399,"fm":1399,"tm":1399,"am":1399,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7671},{"i":9581,"cid":"22NI0036","pid":"P00620302MN","t":"Construction of flood control structure at Cumawas-Poblacion, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":48999755.09,"abc":49000000.0,"fy":"2022","sd":"02/14/2022","cd":"2023-06-06","lat":8.18226,"lon":126.33681,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7672},{"i":9582,"cid":"22NG0032","pid":"P00630538MN","t":"Construction of Flood Control along Bokbokon River, Barangay Ladgaron, Claver, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"CLAVER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"CHARLZ CONSTRUCTION, INC. / GC BUILDERS","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-11-08","lat":9.566372,"lon":125.721045,"sm":441,"fm":441,"tm":441,"am":441,"md":0.0,"ls":"inside","ww":"Bokbokon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Ladgaron","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7673},{"i":9583,"cid":"23MB0009","pid":"P00721312MN","t":"Construction of Concrete Revetment, Barangay Klinan 6, Polomolok, South Cotabato","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"POLOMOLOK (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":53060946.53,"abc":53075000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-07-09","lat":6.199918,"lon":125.132855,"sm":1159,"fm":1159,"tm":1159,"am":1159,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Klinan 6","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7674},{"i":9584,"cid":"20LB0244","pid":"P00444643MN","t":"Construction of Revetment along Davao River, Bolton Bridge Upstream, S.I.R. New Matina, Ph 1, Sandawa Main Drain Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":19600000.0,"abc":19600000.0,"fy":"2020","sd":"12/10/2020","cd":"2022-10-17","lat":7.060865,"lon":125.605559,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.03,"wp":[7.06073,125.60581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7675},{"i":9585,"cid":"22II0019","pid":"P00620339VS","t":"Construction of Gamay Flood Control Structure and Drainage System, Gamay River Basin, Gamay, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"GAMAY (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"MIK AND MEL CONSTRUCTION AND SUPPLY / CDU CONSTRUCTION","c":48900935.42,"abc":48999580.9,"fy":"2022","sd":"02/09/2022","cd":"2023-02-05","lat":12.383921,"lon":125.296937,"sm":562,"fm":562,"tm":562,"am":562,"md":0.0,"ls":"inside","ww":"Gamay","wn":"Gamay River","wd":0.05,"wp":[12.38438,125.29701],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7676},{"i":9586,"cid":"24LI0075","pid":"P00835884MN","t":"Construction of Flood Mitigation Structure, Purok 2 Creek, Gabi, Compostela, Davao de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":4899242.17,"abc":4899449.27,"fy":"2024","sd":"04/26/2024","cd":"2024-07-22","lat":7.605967,"lon":126.055858,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7677},{"i":9587,"cid":"24LF0027","pid":"P00820304MN","t":"Construction of Flood Mitigation Structure along Boston River, Boston, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BOSTON (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"GMPA CONSTRUCTION SERVICES","c":28949891.48,"abc":28950000.0,"fy":"2024","sd":"03/19/2024","cd":"2024-08-22","lat":7.876694,"lon":126.336831,"sm":229,"fm":229,"tm":229,"am":229,"md":0.0,"ls":"inside","ww":"Boston","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7678},{"i":9588,"cid":"20LB0244","pid":"P00444643MN","t":"Construction of Revetment along Davao River, Bolton Bridge Upstream, S.I.R. New Matina, Ph 1, Sandawa Main Drain Section, Right Bank, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"12/10/2020","cd":"2022-10-17","lat":7.060865,"lon":125.605559,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.03,"wp":[7.06073,125.60581],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7679},{"i":9589,"cid":"22MB0013","pid":"P00620235MN","t":"Construction of Concrete Revetment Lower Klinan-Mabuhay (Silway River Basin), Sta. 0+694 - Sta. 1+318, Brgy. Mabuhay, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / TAJ BUILDERS AND SUPPLY","c":86848180.34,"abc":86850000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-11-17","lat":6.201185,"lon":125.133562,"sm":578,"fm":578,"tm":578,"am":1159,"md":0.02,"ls":"boundary","ww":"Silway","wn":"Silway River","wd":3.12,"wp":[6.17747,125.11831],"wst":"matched","br":"Mabuhay","len":624.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":37,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.51,"value":3.12,"text":"The title names Silway, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":339},{"i":9590,"cid":"24ME0080","pid":"P00835805MN","t":"Construction of Lun Masla River (Upstream) Flood Control, Malapatan Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96497759.33,"abc":96500000.0,"fy":"2024","sd":"04/05/2024","cd":"2024-11-20","lat":6.02733,"lon":125.29838,"sm":890,"fm":890,"tm":null,"am":890,"md":0.0,"ls":"inside","ww":"Lun Masla","wn":"Lun Masla River","wd":0.05,"wp":[6.02767,125.29805],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7680},{"i":9591,"cid":"21LA0132","pid":"P00550575MN","t":"Construction of Box Culvert (Double Barrel) at Purok 6, Barangay Gabi, Compostela, Davao De Oro","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"Compostela","deo":"Davao de Oro 1st District Engineering Office","co":"BQPC CORPORATION","c":4949929.19,"abc":4949929.19,"fy":"2021","sd":"03/28/2022","cd":"2022-11-15","lat":7.607754,"lon":126.058139,"sm":447,"fm":null,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gabi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7681},{"i":9592,"cid":"22NI0046","pid":"P00620258MN","t":"Construction of River Bank Protection along Hinatuan River, Sta. 0+000.00 - Sta. 0+290.00, Hinatuan, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"HINATUAN (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":62724987.39,"abc":62725000.0,"fy":"2022","sd":"03/14/2022","cd":"2022-08-30","lat":8.37391,"lon":126.33692,"sm":619,"fm":619,"tm":619,"am":619,"md":0.0,"ls":"inside","ww":"Hinatuan","wn":"Hinatuan River","wd":0.07,"wp":[8.37389,126.33757],"wst":"matched","br":null,"len":290.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7682},{"i":9593,"cid":"24NG0018","pid":"P00820384MN","t":"Construction of Flood Mitigation Structure along Magallanes River, Barangay Sico-Sico, Gigaquit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GIGAQUIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":138817742.1,"abc":139925000.0,"fy":"2024","sd":"02/26/2024","cd":"2024-07-31","lat":9.481236,"lon":125.724638,"sm":582,"fm":582,"tm":582,"am":582,"md":0.0,"ls":"inside","ww":"Magallanes","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Sico-Sico","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7683},{"i":9594,"cid":"22MB0014","pid":"P00620238MN","t":"Construction of Concrete Revetment Lower Klinan-Mabuhay (Silway River Basin), Sta. 0+000 - Sta. 0+694, Brgy. Mabuhay, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96498596.33,"abc":96500000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-11-29","lat":6.198333,"lon":125.133611,"sm":578,"fm":578,"tm":578,"am":1159,"md":0.09,"ls":"boundary","ww":"Silway","wn":"Silway River","wd":2.86,"wp":[6.17747,125.11831],"wst":"matched","br":"Mabuhay","len":694.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7684},{"i":9595,"cid":"24NE0023","pid":"P00820126MN","t":"Construction of Magsaysay River Revetment, Barangay Magsaysay, Dinagat, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"DINAGAT (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"GICAR CONSTRUCTION, INC.","c":72374992.88,"abc":72375000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-12-13","lat":9.97972,"lon":125.605833,"sm":510,"fm":510,"tm":510,"am":510,"md":0.0,"ls":"inside","ww":"Magsaysay","wn":"Magsaysay River","wd":0.22,"wp":[9.98158,125.60655],"wst":"matched","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7685},{"i":9596,"cid":"23KA0149","pid":"P00734017MN","t":"Construction of drainage structure, Municipal Farmers Market, Poblacion, Cabanglasan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CABANGLASAN (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":4900000.0,"abc":4900000.0,"fy":"2023","sd":"03/15/2023","cd":"2023-07-07","lat":8.072578,"lon":125.299889,"sm":274,"fm":274,"tm":274,"am":274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7686},{"i":9597,"cid":"23LG0014","pid":"P00721389MN","t":"Construction of Flood Mitigation Structure along Sumlog River (Tagugpo to Ilangay Section), Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":48997980.39,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-11-12","lat":6.966811,"lon":126.059339,"sm":833,"fm":833,"tm":833,"am":833,"md":0.0,"ls":"inside","ww":"Sumlog","wn":"Sumlog River","wd":0.16,"wp":[6.96565,126.06017],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7687},{"i":9598,"cid":"21NI0062","pid":"P00522291MN","t":"Construction of River Bank Protection along Hinatuan River, Surigao del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":null,"deo":"Surigao del Sur 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":38963427.44,"abc":38963487.8,"fy":"2021","sd":"12/15/2021","cd":"2022-11-15","lat":8.37417,"lon":126.33694,"sm":null,"fm":null,"tm":null,"am":619,"md":null,"ls":"unknown","ww":"Hinatuan","wn":"Hinatuan River","wd":0.07,"wp":[8.37415,126.33757],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":169},{"i":9599,"cid":"22NG0042","pid":"P00630553MN","t":"Construction of River Control, Barangay Bagakay, Claver, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"CLAVER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"CHARLZ CONSTRUCTION, INC.","c":57899998.84,"abc":57900000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-01-07","lat":9.574389,"lon":125.725731,"sm":441,"fm":441,"tm":441,"am":441,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Bagakay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7688},{"i":9600,"cid":"23KA0100","pid":"P00732049MN","t":"Construction of Flood Mitigation Structure, Barangay 9, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"HGG BUILDERS & SUPPLY","c":96499999.25,"abc":96500000.0,"fy":"2023","sd":"02/28/2023","cd":"2024-02-24","lat":8.152251,"lon":125.135442,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"9","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7689},{"i":9601,"cid":"22NH0021","pid":"P00630655MN","t":"Construction of River Wall along Bypass Road to Purok 3 of Barangay Zone III, Lanuza, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LANUZA (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":29399774.88,"abc":29400000.0,"fy":"2022","sd":"08/01/2022","cd":"2023-02-22","lat":9.230783,"lon":126.062644,"sm":749,"fm":749,"tm":749,"am":749,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Zone III","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7690},{"i":9602,"cid":"24KA0104","pid":"P00820046MN","t":"Construction of Flood Mitigation Structure, barangay Paradise (Phase 2), Cabanglasan, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CABANGLASAN (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-05-09","lat":7.997293,"lon":125.301692,"sm":274,"fm":274,"tm":274,"am":274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Paradise","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7691},{"i":9603,"cid":"22NB0043","pid":"P00620352MN","t":"Construction of Flood Mitigation Structures along Andanan River Bank (Upstream), Bayugan City, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":48999901.68,"abc":49000000.0,"fy":"2022","sd":"05/24/2022","cd":"2023-03-19","lat":8.731407,"lon":125.730801,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":"Andanan","wn":"Andanan River","wd":0.04,"wp":[8.7311,125.7307],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7692},{"i":9604,"cid":"22NI0048","pid":"P00620303MN","t":"Improvement of Drainage Canal along NRJ Cumawas- Tinuy-an Falls Road, Cumawas, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur","w":"Construction of Drainage Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":48999970.58,"abc":49000000.0,"fy":"2022","sd":"03/04/2022","cd":"2023-09-16","lat":8.18276,"lon":126.33751,"sm":372,"fm":372,"tm":372,"am":372,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":2000.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7693},{"i":9605,"cid":"24KA0105","pid":"P00820047MN","t":"Construction of Flood Mitigation Structure, barangay Poblacion (Phase 2), Impasug-ong, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"IMPASUG-ONG (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-04-10","lat":8.150217,"lon":125.135744,"sm":637,"fm":637,"tm":637,"am":400,"md":11.22,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"records","s":55,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.85,"value":11.22,"text":"The pin is 11.2 km outside Impasug-Ong, Bukidnon, the nearest municipality the record claims. It falls in City of Malaybalay, Bukidnon.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":145},{"i":9606,"cid":"22LB0025","pid":"P00620163MN","t":"Construction of Esplanade at Davao River, Right Bank Outfall Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-10-26","lat":7.048473,"lon":125.605978,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.13,"wp":[7.04885,125.60713],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7694},{"i":9607,"cid":"22ME0032","pid":"P00620183MN","t":"Construction of Bagacay Bridge Flood Control, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"SILVER HAMMER CONSTRUCTION AND SUPPLIES","c":29399996.68,"abc":29400000.0,"fy":"2022","sd":"03/20/2022","cd":"2022-10-03","lat":6.109917,"lon":125.301856,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7695},{"i":9608,"cid":"23LI0062","pid":"P00721563MN","t":"Construction of revetment along Aunan Creek (Bridge section Downstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96499596.51,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-06","lat":7.74682,"lon":126.066408,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Aunan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Babag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7696},{"i":9609,"cid":"23ME0054","pid":"P00734000MN","t":"Construction of Flood Mitigation Structure at Bagacay Creek, Brgy. Bagacay, Alabel, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":77188853.74,"abc":77200000.0,"fy":"2023","sd":"05/02/2023","cd":"2023-12-15","lat":6.11233,"lon":125.30371,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":"Bagacay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagacay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7697},{"i":9610,"cid":"23NG0046","pid":"P00721629MN","t":"Construction of Flood Mitigation Structure along Magallanes River, Brgy. Lahi, Gigaquit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GIGAQUIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ABOA CONSTRUCTION AND SUPPLY / CHARLZ CONSTRUCTION, INC.","c":47523238.44,"abc":49000000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-07-31","lat":9.4985,"lon":125.7319,"sm":582,"fm":582,"tm":582,"am":441,"md":0.65,"ls":"boundary","ww":"Magallanes","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lahi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7698},{"i":9611,"cid":"24NI0057","pid":"P00820928MN","t":"Construction of Bank Revetment along Hinatuan River (Sto. Niño Section), Hinatuan, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"HINATUAN (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":115796983.1,"abc":115800000.0,"fy":"2024","sd":"04/15/2024","cd":"2024-11-27","lat":8.3705,"lon":126.33771,"sm":619,"fm":619,"tm":619,"am":619,"md":0.0,"ls":"inside","ww":"Hinatuan","wn":"Hinatuan River","wd":0.07,"wp":[8.37067,126.33828],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7699},{"i":9612,"cid":"22MB0016","pid":"P00620283MN","t":"Construction of Concrete Revetment, Sinawal River, Barangay Labangal, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) / REYDAN BUILDERS","c":48849784.13,"abc":49000000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-10-01","lat":6.120865,"lon":125.138251,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.02,"wp":[6.12072,125.13823],"wst":"matched","br":"Labangal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7700},{"i":9613,"cid":"21LB0254","pid":"P00522319MN","t":"Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"PRIMECON BUILDERS, INC. / ARCINUE COMM'L CORPORATION","c":71796000.0,"abc":71796000.0,"fy":"2021","sd":"12/05/2021","cd":"2022-10-20","lat":7.049336,"lon":125.606042,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.1,"wp":[7.04961,125.60687],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7701},{"i":9614,"cid":"23NF0028","pid":"P00734421MN","t":"Construction of Seashore Protection (Seawall) along the Shore of Brgy. Poblacion 1, Poblacion 2, and Bitaug in Municipality of Burgos, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BURGOS (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BAMBOE CONSTRUCTION","c":4948878.13,"abc":4950000.0,"fy":"2023","sd":"05/03/2023","cd":"2023-08-27","lat":10.02392,"lon":126.06998,"sm":263,"fm":263,"tm":null,"am":263,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7702},{"i":9615,"cid":"22II0054","pid":"P00633244VS","t":"Rehabilitation of Seawall, Brgy. Del Norte, Lapinig, Northern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAPINIG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":49004700.0,"abc":49499783.9,"fy":"2022","sd":"05/20/2022","cd":"2022-12-05","lat":12.315,"lon":125.304722,"sm":753,"fm":753,"tm":753,"am":753,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Del Norte","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7703},{"i":9616,"cid":"22N00180","pid":"P00632319MN","t":"Construction of Rockfall Protection Along Cambatong - Portlamon -Baculin Road (Cambatong Section) Hinatuan, Surigao Del Sur","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"HINATUAN (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC","c":106149679.1,"abc":106150000.0,"fy":"2022","sd":"09/19/2022","cd":"2023-09-12","lat":8.432222,"lon":126.343611,"sm":619,"fm":619,"tm":null,"am":619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7704},{"i":9617,"cid":"22NG0020","pid":"P00630642MN","t":"Construction of Flood Mitigation Structure along Magallanes River, Barangay Lahi, Gigaquit, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GIGAQUIT (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48990622.84,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-08-25","lat":9.49861,"lon":125.73806,"sm":582,"fm":582,"tm":582,"am":441,"md":1.3,"ls":"adjacent","ww":"Magallanes","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Lahi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7705},{"i":9618,"cid":"20LB0036","pid":"P00420007MN","t":"Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"APEIRON CONSTRUCTION SOLUTIONS / ABU CONSTRUCTION","c":77523275.0,"abc":77523275.0,"fy":"2020","sd":"12/10/2020","cd":"2022-12-19","lat":7.053756,"lon":125.606269,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.08,"wp":[7.05355,125.6056],"wst":"matched","br":null,"len":448.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7706},{"i":9619,"cid":"23MB0087","pid":"P00734409MN","t":"Construction of Drainage, Barangay Apopong, General Santos City, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS)","c":9899952.37,"abc":9900000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-09-14","lat":6.137223,"lon":125.138384,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Apopong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7707},{"i":9620,"cid":"23LI0061","pid":"P00721562MN","t":"Construction of revetment along Aunan Creek (Bridge section Upstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MONKAYO (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96499253.36,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-12-27","lat":7.744367,"lon":126.07076,"sm":987,"fm":987,"tm":987,"am":987,"md":0.0,"ls":"inside","ww":"Aunan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Babag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7708},{"i":9621,"cid":"24M00112","pid":"P00833571MN","t":"Construction of Flood Mitigation Structure, Bagacay Creek, Barangay Bagacay, Alabel, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":89000301.34,"abc":89100000.0,"fy":"2024","sd":"05/27/2024","cd":"2025-02-17","lat":6.113606,"lon":125.304963,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":"Bagacay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bagacay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7709},{"i":9622,"cid":"24N00100","pid":"P00833294MN","t":"Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC. / SURIGAO LA SUERTE CORPORATION","c":173699971.7,"abc":173700000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-09-15","lat":8.184419,"lon":126.345678,"sm":372,"fm":372,"tm":null,"am":372,"md":0.02,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7710},{"i":9623,"cid":"22NG0059","pid":"P00634153MN","t":"Rehabilitation of Seawall, Sitio Sabang, Brgy. Tayaga, Claver, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"CLAVER (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"ZI 9 BUILDERS AND SUPPLIES","c":4875748.77,"abc":4950000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-07-14","lat":9.58639,"lon":125.73806,"sm":441,"fm":441,"tm":441,"am":441,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tayaga","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7711},{"i":9624,"cid":"23MB0074","pid":"P00721315MN","t":"Construction of Concrete Revetment, Mabuhay Bridge, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS)","c":51089346.18,"abc":51145000.0,"fy":"2023","sd":"07/10/2023","cd":"2024-02-02","lat":6.191208,"lon":125.138472,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7712},{"i":9625,"cid":"22LA0130","pid":"P00630761MN","t":"Construction of Revetment along Batutu River, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":72370604.7,"abc":72374937.84,"fy":"2022","sd":"03/18/2022","cd":"2023-04-17","lat":7.641065,"lon":126.071617,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7713},{"i":9626,"cid":"22NB0006","pid":"P00620294MN","t":"Construction of Bank Protection along Bayugan River, Sta. 0+100 - Sta. 0+349.00 (L/S), Sta. 0+110.00 - Sta. 348.00 (R/S), Bayugan City, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D","c":45079990.82,"abc":45080000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-07-13","lat":8.707164,"lon":125.741787,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":"Bayugan","wn":"Bayugan River","wd":0.0,"wp":[8.70714,125.74179],"wst":"matched","br":null,"len":249.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7714},{"i":9627,"cid":"23NI0052","pid":"P00732106MN","t":"Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Road, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"CITY OF BISLIG (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"J.M. LUCIANO CONSTRUCTION,  INC.","c":77199029.74,"abc":77200000.0,"fy":"2023","sd":"03/17/2023","cd":"2023-07-21","lat":8.18582,"lon":126.34767,"sm":372,"fm":372,"tm":null,"am":372,"md":0.03,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7715},{"i":9628,"cid":"22MB0022","pid":"P00630528MN","t":"Construction of Revetment along Makar River, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":62723813.21,"abc":62725000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-09-10","lat":6.094836,"lon":125.140432,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Makar","wn":"Makar River","wd":0.05,"wp":[6.09439,125.14042],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7716},{"i":9629,"cid":"20LB0036","pid":"P00420007MN","t":"Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"APEIRON CONSTRUCTION SOLUTIONS / ABU CONSTRUCTION","c":77523275.0,"abc":77523275.0,"fy":"2021","sd":"12/10/2020","cd":"2022-12-19","lat":7.053756,"lon":125.606269,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.08,"wp":[7.05355,125.6056],"wst":"matched","br":null,"len":448.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7717},{"i":9630,"cid":"22II0053","pid":"P00633243VS","t":"Rehabilitation of Flood Control at Municipal Port, Brgy. Del Sur, Lapinig, Northern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"LAPINIG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"CDU CONSTRUCTION","c":49491713.8,"abc":49499297.58,"fy":"2022","sd":"05/20/2022","cd":"2023-02-09","lat":12.315599,"lon":125.306745,"sm":753,"fm":753,"tm":753,"am":753,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Del Sur","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7718},{"i":9631,"cid":"24N00126","pid":"P00836163MN","t":"Construction of Shore Protection Structure along Poblacion 2, Burgos, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BURGOS (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / LPO1 GROUP OF COMPANIES INC.","c":98999966.68,"abc":99000000.0,"fy":"2024","sd":"05/13/2024","cd":"2024-12-22","lat":10.020692,"lon":126.072978,"sm":263,"fm":263,"tm":263,"am":263,"md":0.01,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7719},{"i":9632,"cid":"23LF0027","pid":"P00721502MN","t":"Construction of Flood Mitigation Structure along Boston River (Carmen Section), Sta. 0 + 000 - Sta. 0 + 300, Boston, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BOSTON (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"RANGAY CONSTRUCTION AND SUPPLY","c":29399619.39,"abc":29400000.0,"fy":"2023","sd":"04/05/2023","cd":"2023-08-29","lat":7.86986,"lon":126.352004,"sm":229,"fm":229,"tm":229,"am":229,"md":0.0,"ls":"inside","ww":"Boston","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7720},{"i":9633,"cid":"23KA0162","pid":"P00721533MN","t":"Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":72374999.37,"abc":72375000.0,"fy":"2023","sd":"03/13/2023","cd":"2024-03-05","lat":8.016127,"lon":125.141732,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Simaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7721},{"i":9634,"cid":"24N00085","pid":"P00820378MN","t":"Construction of Flood Mitigation Structure along Agusan River Basin protecting Barangay Poblacion of Las Nieves, Package 2, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ADFIL CORPORATION","c":168635678.1,"abc":168635680.0,"fy":"2024","sd":"02/22/2024","cd":"2025-02-28","lat":8.73219,"lon":125.60727,"sm":758,"fm":758,"tm":null,"am":758,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.33,"wp":[8.73012,125.6051],"wst":"matched","br":"Poblacion of Las Nieves","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7722},{"i":9635,"cid":"23ME0049","pid":"P00734405MN","t":"Construction of Drainage System at Brgy. Patag, Malapatan, Sarangani","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"SILVER HAMMER CONSTRUCTION AND SUPPLIES","c":4949593.99,"abc":4950000.0,"fy":"2023","sd":"04/26/2023","cd":"2023-08-22","lat":6.0343,"lon":125.30917,"sm":890,"fm":890,"tm":890,"am":890,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Patag","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7723},{"i":9636,"cid":"24N00121","pid":"P00833300MN","t":"Construction of Shore Protection Structure, Brgy. Poblacion 2, Burgos, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BURGOS (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"RCDG CONSTRUCTION CORPORATION / KENT MARKETING GROUP OF COMPANIES INC.","c":48249809.12,"abc":48250000.0,"fy":"2024","sd":"03/06/2024","cd":"2024-10-01","lat":10.020317,"lon":126.073472,"sm":263,"fm":263,"tm":263,"am":263,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 2","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7724},{"i":9637,"cid":"21LB0016","pid":"P00522102MN","t":"Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173)","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"JARGON CONSTRUCTION & SUPPLY","c":77200000.0,"abc":77200000.0,"fy":"2021","sd":"09/22/2021","cd":"2022-12-23","lat":7.049036,"lon":125.608037,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":0.1,"wp":[7.04875,125.60716],"wst":"matched","br":null,"len":559.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7725},{"i":9638,"cid":"22LF0045","pid":"P00620170MN","t":"Construction of Flood Mitigation Structure along Hulid River, Sta. 0+000 - Sta. 0+100, Cateel, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY)","c":9799417.14,"abc":9800000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-08-26","lat":7.766763,"lon":126.366376,"sm":354,"fm":354,"tm":354,"am":354,"md":0.0,"ls":"inside","ww":"Hulid","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7726},{"i":9639,"cid":"22IB0007","pid":"P00620325VS","t":"Construction of Flood Control Structure along Oras River, Brgy. Cagpili, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES","c":48999969.4,"abc":48984766.27,"fy":"2022","sd":"02/13/2022","cd":"2022-11-11","lat":12.239769,"lon":125.317638,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":"Oras","wn":"Oras River","wd":0.03,"wp":[12.23953,125.31746],"wst":"matched","br":"Cagpili","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7727},{"i":9640,"cid":"21NB0041","pid":"P00522127MN","t":"Construction of Flood Relief along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Road - K1326+822 - K1328+985, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 1st District Engineering Office","co":"MADYAW CONSTRUCTION & DEV. CORPORATION","c":96497913.33,"abc":96500000.0,"fy":"2021","sd":"03/29/2021","cd":"2023-03-25","lat":8.439266,"lon":125.74505,"sm":null,"fm":null,"tm":null,"am":1522,"md":null,"ls":"unknown","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":170},{"i":9641,"cid":"23NH0003","pid":"P00721520MN","t":"Construction of Flood Control Structure along Tago River, Brgy. Libas Gua, San Miguel, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"TAGO (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":48999999.94,"abc":49000000.0,"fy":"2023","sd":"04/04/2023","cd":"2025-03-09","lat":8.923055,"lon":126.076111,"sm":1337,"fm":1516,"tm":1337,"am":1337,"md":0.0,"ls":"inside","ww":"Tago","wn":"Tago River","wd":0.04,"wp":[8.9227,126.07592],"wst":"matched","br":"Libas Gua","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7728},{"i":9642,"cid":"24NE0024","pid":"P00820116MN","t":"Construction of Flood Control Structure Protecting Balinaonao Br., Dinagat, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"DINAGAT (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)","c":67548671.39,"abc":67550000.0,"fy":"2024","sd":"03/05/2024","cd":"2024-09-25","lat":9.989464,"lon":125.609469,"sm":510,"fm":510,"tm":510,"am":510,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7729},{"i":9643,"cid":"23MB0079","pid":"P00721461MN","t":"Construction of Concrete Revetment, Upper Silway Bridge, Silway River, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":51143096.92,"abc":51145000.0,"fy":"2023","sd":"02/21/2023","cd":"2023-10-27","lat":6.153104,"lon":125.142108,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Silway","wn":"Silway River","wd":0.0,"wp":[6.15311,125.14212],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7730},{"i":9644,"cid":"22N00181","pid":"P00632320MN","t":"Construction of Rockfall Protection Along Cambatong - Portlamon - Baculin Road (Portlamon Section) Hinatuan, Surigao del Sur","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"HINATUAN (SURIGAO DEL SUR)","deo":"Surigao del Sur 2nd District Engineering Office","co":"NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC","c":106149809.5,"abc":106150000.0,"fy":"2022","sd":"09/19/2022","cd":"2023-09-12","lat":8.477373,"lon":126.37078,"sm":619,"fm":619,"tm":null,"am":619,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7731},{"i":9645,"cid":"24KA0093","pid":"P00835756MN","t":"Construction of Flood Control, Brgy. Tugop, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2024-10-26","lat":7.968081,"lon":125.322206,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tugop","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7732},{"i":9646,"cid":"23LF0040","pid":"P00721386MN","t":"Construction of Boston Coastal Protection (Cabasagan Section), Boston, Davao Oriental","w":"Construction of Slope Protection Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BOSTON (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JHARKHA CONSTRUCTION AND SUPPLY","c":43105338.71,"abc":43120000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-08-15","lat":7.847605,"lon":126.372584,"sm":229,"fm":229,"tm":229,"am":229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7733},{"i":9647,"cid":"22LC0035","pid":"P00620219MN","t":"Construction of Dike along Tagum Libuganon River, Brgy. Bincungan - Brgy. Busaon, Tagum City, Davao del Norte","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":47211408.0,"abc":47211408.0,"fy":"2022","sd":"03/01/2022","cd":"2023-08-07","lat":7.372481,"lon":125.745506,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":"Tagum Libuganon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Bincungan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7734},{"i":9648,"cid":"23LG0052","pid":"P00734031MN","t":"Construction of Flood Mitigation Structure, Brgy. Macangao, Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":34300000.0,"abc":34300000.0,"fy":"2023","sd":"03/30/2023","cd":"2023-11-20","lat":6.892125,"lon":126.076206,"sm":833,"fm":833,"tm":833,"am":833,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Macangao","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7735},{"i":9649,"cid":"21MB0021","pid":"P00522370MN","t":"Construction of Flood Control/Concrete Revetment along Makar River (Phase 2), Barangay Labangal, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"General Santos City","deo":"South Cotabato 1st District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":48998990.7,"abc":49000000.0,"fy":"2021","sd":"03/08/2022","cd":"2022-09-30","lat":6.094344,"lon":125.142422,"sm":578,"fm":null,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Makar","wn":"Makar River","wd":0.03,"wp":[6.0941,125.14236],"wst":"matched","br":"Labangal","len":null,"ph":"Phase 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7736},{"i":9650,"cid":"24KA0123","pid":"P00835758MN","t":"Construction of Flood Control Structure (Package 2) barangay Tugop, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"02/22/2024","cd":"2024-11-17","lat":7.969531,"lon":125.324706,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tugop","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7737},{"i":9651,"cid":"23NE0010","pid":"P00721398MN","t":"Construction of Flood Control Structure at Balinaonao Br., Barangay Cayetano, Dinagat, Dinagat Islands","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"DINAGAT ISLANDS","mu":"DINAGAT (DINAGAT ISLANDS)","deo":"Dinagat Islands District Engineering Office","co":"CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)","c":9779976.14,"abc":9800000.0,"fy":"2023","sd":"02/23/2023","cd":"2023-08-03","lat":9.990199,"lon":125.610018,"sm":510,"fm":510,"tm":510,"am":510,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cayetano","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7738},{"i":9652,"cid":"24LF0013","pid":"P00820174MN","t":"Construction of Cateel I IS River Bank Protection Dike along the Left Main Canal Service Road, Cateel, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":14699816.87,"abc":14700000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-10-15","lat":7.743753,"lon":126.379105,"sm":354,"fm":354,"tm":354,"am":354,"md":0.0,"ls":"inside","ww":"Cateel I IS","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7739},{"i":9653,"cid":"22LG0015","pid":"P00630610MN","t":"Construction of Flood Mitigation Structure along Sumlog River (Barangay Tagugpo to Barangay Ilangay Section) Lupon, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":29398234.15,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-11","lat":6.973977,"lon":126.076221,"sm":833,"fm":833,"tm":null,"am":833,"md":0.0,"ls":"inside","ww":"Sumlog","wn":"Sumlog River","wd":0.2,"wp":[6.97509,126.0776],"wst":"matched","br":"Tagugpo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7740},{"i":9654,"cid":"22LB0371","pid":"P00633923MN","t":"Construction of Drainage System at Purok 7 & 9, Barangay 39-D, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-01-10","lat":7.061388,"lon":125.612633,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"39-D","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7741},{"i":9655,"cid":"24MB0002","pid":"P00820328MN","t":"Construction of Concrete Revetment, Upper Silway Bridge, Silway River, Barangay Apopong, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":69961399.76,"abc":69962500.0,"fy":"2024","sd":"03/12/2024","cd":"2024-10-18","lat":6.150469,"lon":125.142434,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Silway","wn":"Silway River","wd":0.02,"wp":[6.15031,125.14257],"wst":"matched","br":"Apopong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7742},{"i":9656,"cid":"23K00108","pid":"P00721243MN","t":"Construction of Flood Control Structure along Tigwa River, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":99002702.01,"abc":101325000.0,"fy":"2023","sd":"02/13/2023","cd":"2024-02-01","lat":7.923425,"lon":125.330541,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Tigwa","wn":"Tigwa River","wd":0.02,"wp":[7.92342,125.33075],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7743},{"i":9657,"cid":"24LF0024","pid":"P00820074MN","t":"Construction of Flood Mitigation Structure along Baguan River, Tarragona, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"TARRAGONA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION)","c":48248389.36,"abc":48250000.0,"fy":"2024","sd":"03/19/2024","cd":"2025-01-13","lat":7.056676,"lon":126.408643,"sm":1553,"fm":1553,"tm":1553,"am":1553,"md":0.0,"ls":"inside","ww":"Baguan","wn":"Baguan River","wd":0.04,"wp":[7.05681,126.40834],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7744},{"i":9658,"cid":"24NB0050","pid":"P00820210MN","t":"Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION","c":29399610.23,"abc":29400000.0,"fy":"2024","sd":"08/12/2024","cd":"2024-12-10","lat":8.739616,"lon":125.747067,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7745},{"i":9659,"cid":"23NF0032","pid":"P00721589MN","t":"Rehabilitation of Shore Protection Structure, Barangay Poblacion 1, Burgos, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BURGOS (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":47951985.95,"abc":48443000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-04-24","lat":10.01651,"lon":126.07662,"sm":263,"fm":263,"tm":263,"am":263,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7746},{"i":9660,"cid":"23N00096","pid":"P00721477MN","t":"Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Downstream, Las Nieves, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":115799197.3,"abc":115800000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-05-30","lat":8.722582,"lon":125.613281,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.1,"wp":[8.72352,125.61313],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9661],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 231,598,764.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":700},{"i":9661,"cid":"23N00097","pid":"P00721478MN","t":"Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Upstream, Las Nieves, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"LAS NIEVES (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)","c":115799566.4,"abc":115800000.0,"fy":"2023","sd":"04/20/2023","cd":"2024-05-30","lat":8.722582,"lon":125.613281,"sm":758,"fm":758,"tm":758,"am":758,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.1,"wp":[8.72352,125.61313],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9660],"run":[],"cl":[],"L":"field","s":29,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 231,598,764.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":701},{"i":9662,"cid":"24NB0012","pid":"P00820363MN","t":"Construction of Bank Protection along Agusan River (Magtuyon Section) San Luis, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"SAN LUIS (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"J.M. LACORTE CONSTRUCTION / LEXICON DEVELOPMENT CORPORATION","c":77199705.93,"abc":77200000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-12-11","lat":8.475431,"lon":125.748515,"sm":1322,"fm":1322,"tm":null,"am":1322,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.05,"wp":[8.47499,125.74856],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7747},{"i":9663,"cid":"22LF0009","pid":"P00620175MN","t":"Rehabilitation of Flood Control Structure along Baguan River, Sta. 0+000 - Sta. 0+400, Tarragona, Davao Oriental","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"TARRAGONA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY)","c":29399769.79,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-02","lat":7.037276,"lon":126.410566,"sm":1553,"fm":1553,"tm":1553,"am":1553,"md":0.0,"ls":"inside","ww":"Baguan","wn":"Baguan River","wd":0.03,"wp":[7.03738,126.41083],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7748},{"i":9664,"cid":"23LG0066","pid":"P00721620MN","t":"Construction of Flood Mitigation Structure along Tibanban River, Governor Generoso, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"GOVERNOR GENEROSO (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":24132496.94,"abc":24500000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-11-15","lat":6.630418,"lon":126.076663,"sm":593,"fm":593,"tm":593,"am":593,"md":0.0,"ls":"inside","ww":"Tibanban","wn":"Tibanban River","wd":1.15,"wp":[6.62019,126.07871],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7749},{"i":9665,"cid":"24KA0143","pid":"P00835776MN","t":"Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE  BUILDERS AND GEN. MERCHANDISE)","c":135100000.0,"abc":135100000.0,"fy":"2024","sd":"02/27/2024","cd":"2025-02-18","lat":8.010822,"lon":125.144019,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Simaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7750},{"i":9666,"cid":"23K00161","pid":"P00721244MN","t":"Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Package 2, Barangay Halapitan (Poblacion), San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":65122870.63,"abc":66550000.0,"fy":"2023","sd":"03/29/2023","cd":"2024-03-17","lat":7.921056,"lon":125.330736,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Mawi-i","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Halapitan","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7751},{"i":9667,"cid":"22LF0046","pid":"P00620171MN","t":"Construction of Flood Mitigation Structure, Sibajay Coastal Protection, Sta. 0+000 - Sta. 0+250, Boston, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BOSTON (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"RDJM CONSTRUCTION AND SUPPLY","c":29398519.57,"abc":29400000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-06","lat":7.827187,"lon":126.41416,"sm":229,"fm":229,"tm":229,"am":229,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":250.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7752},{"i":9668,"cid":"22LC0095","pid":"P00630524MN","t":"Construction of Revetment along Tagum Libuganon River Basin, Carmen Section, Brgy. Guadalupe, Carmen, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":67549987.12,"abc":67550000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-12-28","lat":7.39155,"lon":125.749194,"sm":339,"fm":339,"tm":339,"am":339,"md":0.0,"ls":"inside","ww":"Tagum Libuganon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Guadalupe","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7753},{"i":9669,"cid":"23NH0112","pid":"P00746137MN","t":"Reconstruction of Flood Control Project in Barangay Ban-as, Municipality of Lianga, Surigao del Sur - Barangay Roads","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LIANGA (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":134798744.4,"abc":134798785.9,"fy":"2023","sd":"01/10/2024","cd":"2024-11-27","lat":8.6428,"lon":126.08567,"sm":775,"fm":775,"tm":775,"am":775,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ban-as","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7754},{"i":9670,"cid":"24II0037","pid":"P00820251VS","t":"Construction of Palapag CIS River Bank Protection at Damsite, Palapag, Northern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"NORTHERN SAMAR","mu":"PALAPAG (NORTHERN SAMAR)","deo":"Northern Samar 2nd District Engineering Office","co":"DEACONS TEMPLE CONSTRUCTION & SUPPLY","c":9791028.32,"abc":9799917.39,"fy":"2024","sd":"05/15/2024","cd":"2024-11-10","lat":12.49998,"lon":125.146488,"sm":1066,"fm":1066,"tm":1066,"am":1066,"md":0.0,"ls":"inside","ww":"Palapag CIS","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7755},{"i":9671,"cid":"21LB0287","pid":"P00550458MN","t":"Construction of Drainage System leading to Roxas Maindrain, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY / O. G. SANTOS CONSTRUCTION","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"01/16/2022","cd":"2023-01-25","lat":7.07058,"lon":125.613384,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7756},{"i":9672,"cid":"23KA0047","pid":"P00721365MN","t":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Tigwa River), Barangay Halapitan, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":49000000.0,"abc":49000000.0,"fy":"2023","sd":"01/31/2023","cd":"2023-11-11","lat":7.924754,"lon":125.330924,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Tigwa","wn":"Tigwa River","wd":0.04,"wp":[7.9246,125.3313],"wst":"matched","br":"Halapitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7757},{"i":9673,"cid":"23LF0094","pid":"P00721388MN","t":"Construction of Flood Mitigation Structure along Surigao Del Sur - Davao Oriental Coastal Road (Sta Filomena - Central Section), Sta. 1541 + 000.00 - Sta. 1544 + 000.00, Cateel, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JHARKHA CONSTRUCTION AND SUPPLY","c":19599646.11,"abc":19600000.0,"fy":"2023","sd":"05/23/2023","cd":"2024-06-03","lat":7.809187,"lon":126.438048,"sm":354,"fm":354,"tm":354,"am":354,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7758},{"i":9674,"cid":"21LB0118","pid":"P00522101MN","t":"Drainage System Leading to Dacudao Maindrain, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ABU CONSTRUCTION","c":56610760.0,"abc":56610760.0,"fy":"2021","sd":"08/16/2021","cd":"2023-04-30","lat":7.094162,"lon":125.613691,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7759},{"i":9675,"cid":"21LC0200","pid":"P00550542MN","t":"Construction of Concrete Revetment along Tagum Libuganon River Basin, Carmen Section, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":null,"deo":"Davao del Norte District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":48125352.0,"abc":49000000.0,"fy":"2021","sd":"01/27/2022","cd":"2022-10-04","lat":7.387953,"lon":125.749544,"sm":null,"fm":null,"tm":null,"am":339,"md":null,"ls":"unknown","ww":"Tagum Libuganon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":171},{"i":9676,"cid":"23LI0030","pid":"P00721647MN","t":"Construction of Flood Mitigation Structure along Agusan River (Agusan Valma Bridge Downstream), Brgy. Poblacion, Compostela, Davao De Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":93315500.0,"abc":93315500.0,"fy":"2023","sd":"03/21/2023","cd":"2023-11-15","lat":7.676195,"lon":126.088451,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.0,"wp":[7.67615,126.08844],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7760},{"i":9677,"cid":"21K00262","pid":"P00522062MN","t":"Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Brgy. Halapitan (Poblacion), San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"San Fernando","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":57865469.51,"abc":61064235.0,"fy":"2021","sd":"08/16/2021","cd":"2022-07-28","lat":7.920557,"lon":125.330932,"sm":1274,"fm":null,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Mawi-i","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Halapitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7761},{"i":9678,"cid":"21LB0306","pid":"P00550459MN","t":"Construction of Drainage System leading to Dacudao Maindrain, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"01/16/2022","cd":"2022-10-27","lat":7.090898,"lon":125.613827,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7762},{"i":9679,"cid":"22LC0040","pid":"P00620233MN","t":"Construction of Saug River Flood Control, Pagsabangan Section, Tagum City, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":57900000.0,"abc":57900000.0,"fy":"2022","sd":"02/22/2022","cd":"2022-11-28","lat":7.478767,"lon":125.751206,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":"Saug","wn":"Saug River","wd":0.17,"wp":[7.47869,125.75271],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9705,9701,9713],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LC0036 to 22LC0040) cover the same site, together worth PHP 299,130,701.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":464},{"i":9680,"cid":"24LF0074","pid":"P00833298MN","t":"Construction of Flood Mitigation Structure Protecting Surigao Del Sur Bdry. - Davao Oriental Coastal Road (Moyapoy Section), Tarragona, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"TARRAGONA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"ECBJ EASTCOAST CONSTRUCTION","c":48249684.37,"abc":48250000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-07-15","lat":7.020912,"lon":126.443063,"sm":1553,"fm":1553,"tm":1553,"am":1553,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7763},{"i":9681,"cid":"24LD0011","pid":"P00820065MN","t":"Construction of Concrete Revetment along Bulatukan River, Barangay Poblacion, Magsaysay, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MAGSAYSAY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.","c":115800000.0,"abc":115800000.0,"fy":"2024","sd":"03/07/2024","cd":"2024-10-26","lat":6.74608,"lon":125.14812,"sm":870,"fm":870,"tm":870,"am":870,"md":0.0,"ls":"inside","ww":"Bulatukan","wn":"Bulatukan River","wd":0.02,"wp":[6.74617,125.14829],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7764},{"i":9682,"cid":"23LI0060","pid":"P00721644MN","t":"Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":96499992.3,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-12-06","lat":7.675722,"lon":126.088621,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Old Batutu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7765},{"i":9683,"cid":"22N00108","pid":"P00620104MN","t":"Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"NASIPIT (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ADFIL CORPORATION","c":120624963.4,"abc":120625000.0,"fy":"2022","sd":"10/07/2022","cd":"2023-04-30","lat":8.970381,"lon":125.333489,"sm":1013,"fm":1013,"tm":1013,"am":1013,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Camagong","len":259.5,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7766},{"i":9684,"cid":"24LF0046","pid":"P00833292MN","t":"Construction of Flood Mitigation Structure along Lingayao River (Sitio Sumading), Manay, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":96495097.92,"abc":96500000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-10-28","lat":7.13978,"lon":126.469888,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Lingayao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7767},{"i":9685,"cid":"23L00171","pid":"P00734402MN","t":"Construction of Slope Protection at Mabaus Relief Drainage in Carmen, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte 2nd District Engineering Office","co":"FORDEX CONSTRUCTION CORPORATION","c":9876434.36,"abc":9900000.0,"fy":"2023","sd":"11/17/2023","cd":"2024-06-02","lat":7.4083,"lon":125.753,"sm":339,"fm":339,"tm":null,"am":339,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7768},{"i":9686,"cid":"22LD0033","pid":"P00630526MN","t":"Construction of Revetment, Magsaysay, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"MAGSAYSAY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2022-11-05","lat":6.750834,"lon":125.148623,"sm":870,"fm":870,"tm":870,"am":870,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7769},{"i":9687,"cid":"22LG0011","pid":"P00620178MN","t":"Construction of Flood Mitigation Structure along Cuabo Creek, Sta.0+000 - Sta. 0+400, Lupon Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"LUPON (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"FAJR CONSTRUCTION PARTS AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-08","lat":6.90475,"lon":126.08886,"sm":833,"fm":833,"tm":null,"am":833,"md":0.0,"ls":"inside","ww":"Cuabo","wn":"Cuabo River","wd":0.1,"wp":[6.90465,126.08798],"wst":"matched","br":null,"len":400.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7770},{"i":9688,"cid":"22LB0245","pid":"P00631101MN","t":"Rehabilitation of existing Flood Mitigation Structure at Barangay 17-B Poblacion, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"CJEP BUILDERS AND ENGINEERING SERVICES","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/13/2022","cd":"2022-08-29","lat":7.083661,"lon":125.615757,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"17-B Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7771},{"i":9689,"cid":"22L00084","pid":"P00630509MN","t":"Construction of Digos River Flood Control Project, Barangay Ruparan (Section 6), City of Digos, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION)","c":173600437.6,"abc":173700000.0,"fy":"2022","sd":"03/25/2022","cd":"2024-02-25","lat":6.780079,"lon":125.333575,"sm":383,"fm":383,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.01,"wp":[6.78009,125.33366],"wst":"matched","br":"Ruparan","len":null,"ph":"Section 6","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7772},{"i":9690,"cid":"24LF0038","pid":"P00833296MN","t":"Construction of Concrete Revetment along Lingayao River, Brgy. San Ignacio, Manay, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"ECBJ EASTCOAST CONSTRUCTION","c":48249609.7,"abc":48250000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-07-22","lat":7.1227,"lon":126.4797,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Lingayao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Ignacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7773},{"i":9691,"cid":"23I00084","pid":"P00733310VS","t":"Construction of Flood Control Structure, Barangay Poblacion, Hernani, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"HERNANI (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"QUEEN MARIECRIS CONSTRUCTION CORP.","c":24123628.52,"abc":24124924.27,"fy":"2023","sd":"07/12/2023","cd":"2023-12-06","lat":11.321771,"lon":125.61678,"sm":616,"fm":616,"tm":616,"am":616,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7774},{"i":9692,"cid":"23LI0067","pid":"P00721571MN","t":"Construction of Protection Dike at Cambaong Creek, Poblacion, Compostela, Davao de Oro","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"METRO GEAR CONSTRUCTION CORP. / REPLICON CONSTRUCTION CORPORATION","c":51859623.25,"abc":96500000.0,"fy":"2023","sd":"08/09/2023","cd":"2024-11-08","lat":7.675793,"lon":126.089266,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Cambaong","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7775},{"i":9693,"cid":"24M00162","pid":"P00820325MN","t":"Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":120624229.7,"abc":120625000.0,"fy":"2024","sd":"08/12/2024","cd":"2025-03-21","lat":6.111089,"lon":125.149238,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.01,"wp":[6.11122,125.14927],"wst":"matched","br":"Labangal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7776},{"i":9694,"cid":"22L00081","pid":"P00630506MN","t":"Construction of Digos River Flood Control Project, Barangay Ruparan (Section 3), City of Digos, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":173625230.3,"abc":173700000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-03-27","lat":6.786175,"lon":125.333874,"sm":383,"fm":383,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.0,"wp":[6.78618,125.33386],"wst":"matched","br":"Ruparan","len":null,"ph":"Section 3","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7777},{"i":9695,"cid":"22LF0099","pid":"P00620380MN","t":"Construction of Flood Mitigation Structure protecting Surigao del Sur Bdry - Davao Oriental Coastal Rd (San Ignacio Section), Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":96499661.76,"abc":96500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-12","lat":7.116111,"lon":126.484216,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7778},{"i":9696,"cid":"22LC0096","pid":"P00630603MN","t":"Construction of Concrete Revetment along Tagum-Libuganon River Basin, Carmen Section, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CARMEN (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/11/2022","cd":"2022-11-17","lat":7.402742,"lon":125.755122,"sm":339,"fm":339,"tm":null,"am":339,"md":0.0,"ls":"inside","ww":"Tagum-Libuganon","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7779},{"i":9697,"cid":"22LB0414","pid":"P00634137MN","t":"Construction (Riprapping) of Canal from Deca Homes going to Country Homes up to the boundary of Barangay Communal, Barangay Cabantian, Buhangin District, Davao City (near Greenland Phase 1)","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"MARK ANTHONY CONSTRUCTION & SUPPLY","c":29700000.0,"abc":29700000.0,"fy":"2022","sd":"06/09/2022","cd":"2023-05-07","lat":7.131305,"lon":125.619181,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Communal","len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7780},{"i":9698,"cid":"21MB0023","pid":"P00522369MN","t":"Construction of Concrete Revetment, P.I. Silway River, Barangay Apopong, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"General Santos City","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":22631367.51,"abc":29400000.0,"fy":"2021","sd":"03/08/2022","cd":"2022-09-20","lat":6.130386,"lon":125.15105,"sm":578,"fm":null,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"P.I. Silway","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Apopong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7781},{"i":9699,"cid":"22L00083","pid":"P00630508MN","t":"Construction of Digos River Flood Control Project, Barangay Ruparan (Section 5), City of Digos, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":173700000.0,"abc":173700000.0,"fy":"2022","sd":"03/24/2022","cd":"2023-11-23","lat":6.796318,"lon":125.334886,"sm":383,"fm":383,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.0,"wp":[6.79632,125.33487],"wst":"matched","br":"Ruparan","len":null,"ph":"Section 5","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7782},{"i":9700,"cid":"23LF0028","pid":"P00732066MN","t":"Construction of Revetment along Lingayao River, barangay San Ignacio, Manay, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":96496078.47,"abc":96500000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-10-30","lat":7.117758,"lon":126.485185,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Lingayao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Ignacio","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7783},{"i":9701,"cid":"22LC0038","pid":"P00620231MN","t":"Construction of Revetment along Saug River, Cambanogoy, Asuncion, Davao del Norte","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"ASUNCION (SAUG) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":96498062.26,"abc":96500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-05","lat":7.531736,"lon":125.755994,"sm":80,"fm":80,"tm":80,"am":80,"md":0.0,"ls":"inside","ww":"Saug","wn":"Saug River","wd":0.01,"wp":[7.53176,125.75589],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9705,9713,9679],"cl":[],"L":"field","s":40,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LC0036 to 22LC0040) cover the same site, together worth PHP 299,130,701.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":298},{"i":9702,"cid":"21LB0012","pid":"P00522089MN","t":"Construction of Davao River Flood Control, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":69518600.0,"abc":69646945.0,"fy":"2021","sd":"01/16/2022","cd":"2023-10-16","lat":7.08951,"lon":125.61933,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":1.89,"wp":[7.08962,125.60222],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9706],"run":[],"cl":[],"L":"field","s":26,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 117,241,822.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":865},{"i":9703,"cid":"22L00082","pid":"P00630507MN","t":"Construction of Digos River Flood Control Project, Barangay Ruparan (Section 4), City of Digos, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":173700000.0,"abc":173700000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-12-16","lat":6.791493,"lon":125.335042,"sm":383,"fm":383,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.01,"wp":[6.79142,125.33514],"wst":"matched","br":"Ruparan","len":null,"ph":"Section 4","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7784},{"i":9704,"cid":"23LI0043","pid":"P00721573MN","t":"Construction of Revetment along Aguibawa Creek leading to Agusan River at Brgy. Poblacion, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"METRO GEAR CONSTRUCTION CORP. / REPLICON CONSTRUCTION CORPORATION","c":96499994.56,"abc":96500000.0,"fy":"2023","sd":"03/24/2023","cd":"2024-03-22","lat":7.676167,"lon":126.089607,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Aguibawa","wn":"Agibawa River","wd":0.07,"wp":[7.67586,126.09016],"wst":"matched","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7785},{"i":9705,"cid":"22LC0036","pid":"P00620220MN","t":"Construction of Flood Control Structure along Saug River, Protecting Tagum-Panabo Circumferential Road, Asuncion, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"ASUNCION (SAUG) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":57882638.53,"abc":57900000.0,"fy":"2022","sd":"03/01/2022","cd":"2023-03-12","lat":7.539431,"lon":125.756547,"sm":80,"fm":80,"tm":80,"am":80,"md":0.0,"ls":"inside","ww":"Saug","wn":"Saug River","wd":0.04,"wp":[7.5391,125.75657],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9701,9713,9679],"cl":[],"L":"field","s":37,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LC0036 to 22LC0040) cover the same site, together worth PHP 299,130,701.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":465},{"i":9706,"cid":"21LB0307","pid":"P00550540MN","t":"Construction of Davao River Flood Control System, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"MRD GEMPESAW CONSTRUCTION CORP. / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.","c":47723221.79,"abc":48250000.0,"fy":"2021","sd":"12/23/2021","cd":"2023-05-24","lat":7.08951,"lon":125.61933,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Davao","wn":"Davao River","wd":1.89,"wp":[7.08962,125.60222],"wst":"matched","br":null,"len":null,"ph":null,"dup":[9702],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 117,241,822.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":942},{"i":9707,"cid":"24LF0045","pid":"P00833291MN","t":"Construction of Flood Mitigation Structure along Casauman River, Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":96498973.69,"abc":96500000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-09-21","lat":7.355291,"lon":126.503149,"sm":913,"fm":913,"tm":913,"am":330,"md":8.78,"ls":"outside","ww":"Casauman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":53,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.81,"value":8.78,"text":"The pin is 8.8 km outside Manay, Davao Oriental, the nearest municipality the record claims. It falls in Caraga, Davao Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":163},{"i":9708,"cid":"24M00224","pid":"P00821202MN","t":"Construction of Concrete Revetment along Silway River, Barangay Apopong, General Santos City","w":"Construction of Revetment","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96400433.63,"abc":96500000.0,"fy":"2024","sd":"07/22/2024","cd":"2025-04-25","lat":6.130522,"lon":125.151076,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Silway","wn":"Silway River","wd":0.03,"wp":[6.13061,125.15131],"wst":"matched","br":"Apopong","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7786},{"i":9709,"cid":"21LD0056","pid":"P00550464MN","t":"Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"City of Digos","deo":"Davao del Sur District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":19600000.0,"abc":19600000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-08-12","lat":6.76592,"lon":125.33716,"sm":383,"fm":null,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.02,"wp":[6.76606,125.3373],"wst":"matched","br":"Tres de Mayo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7787},{"i":9710,"cid":"22LA0044","pid":"P00620266MN","t":"Construction of Revetment along Agusan River, Sta. 0+807.71 - Sta. 1+156.52 (RS), Purok 3 Brgy. Osmeña to Purok 1, Poblacion, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"THREE W BUILDERS, INC.","c":48999996.26,"abc":48999997.02,"fy":"2022","sd":"02/15/2022","cd":"2022-11-05","lat":7.676115,"lon":126.089816,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.02,"wp":[7.67598,126.08979],"wst":"matched","br":"Osmeña","len":348.8,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7788},{"i":9711,"cid":"24LF0075","pid":"P00833299MN","t":"Construction of Revetment along Caraga River (Don Leon Balante Section), Caraga, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"ECBJ EASTCOAST CONSTRUCTION","c":48249988.81,"abc":48250000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-11-29","lat":7.345274,"lon":126.505251,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.07,"wp":[7.34586,126.50558],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7789},{"i":9712,"cid":"22LH0120","pid":"P00630596MN","t":"Construction of River Dike in Purok 2 Waling Waling, Barangay Gumitan, Marilog District, Davao City","w":"Construction of Dike","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City 2nd District Engineering Office","co":"RK STAR ECOENGINEERING","c":9504924.22,"abc":9800000.0,"fy":"2022","sd":"05/05/2022","cd":"2022-08-10","lat":7.440353,"lon":125.34535,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gumitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7790},{"i":9713,"cid":"22LC0039","pid":"P00620232MN","t":"Construction of Saug River Flood Control, Asuncion, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"ASUNCION (SAUG) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":86850000.0,"abc":86850000.0,"fy":"2022","sd":"02/22/2022","cd":"2023-01-22","lat":7.538889,"lon":125.757517,"sm":80,"fm":80,"tm":80,"am":80,"md":0.0,"ls":"inside","ww":"Saug","wn":"Saug River","wd":0.03,"wp":[7.53918,125.75745],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[9705,9701,9679],"cl":[],"L":"field","s":39,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":4,"text":"4 contracts with consecutive numbers (22LC0036 to 22LC0040) cover the same site, together worth PHP 299,130,701.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":375},{"i":9714,"cid":"22LD0032","pid":"P00630518MN","t":"Construction of Revetment along Balutakay River (Bridge Upstream Section), Balutakay, Hagonoy, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"HAGONOY (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES / LEDCORE CONSTRUCTION AND DEVELOPMENT CORP,","c":67550000.0,"abc":67550000.0,"fy":"2022","sd":"02/18/2022","cd":"2023-04-01","lat":6.719846,"lon":125.346142,"sm":613,"fm":613,"tm":613,"am":613,"md":0.0,"ls":"inside","ww":"Balutakay","wn":"Balutakay River","wd":0.01,"wp":[6.71974,125.34612],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7791},{"i":9715,"cid":"22IK0051","pid":"P00632045VS","t":"Construction of Tide Embankment Brgy Catadman, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"EMB CONSTRUCTION AND SUPPLY","c":25739029.39,"abc":25479999.46,"fy":"2022","sd":"03/22/2022","cd":"2022-08-08","lat":11.271667,"lon":125.151944,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Catadman","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.01017,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":943},{"i":9716,"cid":"23NH0060","pid":"P00734004MN","t":"Construction of Dike Revetment along Liangan River, Lianga, Surigao del Sur","w":"Construction of Dike","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LIANGA (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":96499679.89,"abc":96500000.0,"fy":"2023","sd":"05/10/2023","cd":"2024-02-28","lat":8.642026,"lon":126.089827,"sm":775,"fm":775,"tm":775,"am":775,"md":0.0,"ls":"inside","ww":"Liangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7792},{"i":9717,"cid":"22LB0232","pid":"P00631098MN","t":"Construction of Drainage System at Diamond Street, Barangay Gov. Paciano Bangoy, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG","c":6930000.0,"abc":6930000.0,"fy":"2022","sd":"03/31/2022","cd":"2023-09-01","lat":7.090318,"lon":125.620844,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Gov. Paciano Bangoy","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7793},{"i":9718,"cid":"24LF0014","pid":"P00820076MN","t":"Construction of Flood Mitigation Structure along Caraga River, Pacahun Section, Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"DBR CONSTRUCTION CORPORATION (FORMERLY: D.B. RAVELO CONSTRUCTION & SUPPLY)","c":48247726.58,"abc":48250000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-11-15","lat":7.345283,"lon":126.506899,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.04,"wp":[7.34558,126.50676],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7794},{"i":9719,"cid":"22LC0194","pid":"P00634999MN","t":"Construction of Drainage Canal in Barangay Tibal-og, Sto. Tomas, Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"SANTO TOMAS (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":4919156.22,"abc":4950000.0,"fy":"2022","sd":"06/02/2022","cd":"2023-01-15","lat":7.527556,"lon":125.621828,"sm":1420,"fm":1420,"tm":1420,"am":1420,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Tibal-og","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7795},{"i":9720,"cid":"23LD0009","pid":"P00721501MN","t":"Construction of Revetment along Digos River, Digos City, Davao del Sur","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"TKS BUILDERS & SUPPLIES","c":39200000.0,"abc":39200000.0,"fy":"2023","sd":"02/17/2023","cd":"2023-10-05","lat":6.763455,"lon":125.347462,"sm":383,"fm":383,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.01,"wp":[6.76356,125.34744],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7796},{"i":9721,"cid":"23KA0164","pid":"P00721535MN","t":"Construction of Flood Mitigation Structure, Sta. 0 + 000 - Sta. 0 + 156, Barangay Can-ayan, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE","c":96499999.3,"abc":96500000.0,"fy":"2023","sd":"03/13/2023","cd":"2023-12-17","lat":8.192725,"lon":125.153617,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Can-ayan","len":156.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7797},{"i":9722,"cid":"23LF0106","pid":"P00734404MN","t":"Construction of Flood Control Structure, Barangay Mahan ub, Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"TARRAGONA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JAI BUILDERS CORPORATION ( FORMERLY JAI BUILDERS AND SUPPLY)","c":4949987.48,"abc":4950000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-07-14","lat":7.573189,"lon":126.508142,"sm":107,"fm":1553,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mahan ub","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":20,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":47.64,"text":"The record contradicts itself: the title and the pin point to Baganga, Davao Oriental, but the municipality field names Tarragona, Davao Oriental, 48 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":633},{"i":9723,"cid":"21N00142","pid":"P00550439MN","t":"Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"Talacogon","deo":"Agusan del Sur 1st District Engineering Office","co":"CM TAN CONSTRUCTION","c":139924981.4,"abc":139925000.0,"fy":"2021","sd":"04/20/2022","cd":"2022-12-15","lat":8.462851,"lon":125.760982,"sm":1522,"fm":null,"tm":1522,"am":1322,"md":0.06,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7798},{"i":9724,"cid":"21NH0092","pid":"P00550524MN","t":"Construction of Dike Revetment along Liangan River, Lianga, Surigao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"Lianga","deo":"Surigao del Sur 1st District Engineering Office","co":"ARQ BUILDERS","c":81722678.26,"abc":96500000.0,"fy":"2021","sd":"01/18/2022","cd":"2023-01-09","lat":8.641987,"lon":126.089969,"sm":775,"fm":null,"tm":775,"am":775,"md":0.0,"ls":"inside","ww":"Liangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7799},{"i":9725,"cid":"22LB0376","pid":"P00633928MN","t":"Rehabilitation of Drainage System at Barangay 23-C, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"BQPC CORPORATION","c":6860000.0,"abc":6860000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-03-25","lat":7.07177,"lon":125.622173,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"23-C","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7800},{"i":9726,"cid":"24IB0041","pid":"P00820144VS","t":"Rehabilitation of Flood Control Structure along Dolores River, Barangay Magsaysay, Dolores, Eastern Samar","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"DOLORES (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) / JAMA88 BUILDERS INC.","c":49545983.48,"abc":49545995.0,"fy":"2024","sd":"03/18/2024","cd":"2024-11-02","lat":12.037306,"lon":125.348019,"sm":524,"fm":524,"tm":524,"am":524,"md":0.0,"ls":"inside","ww":"Dolores","wn":"Dolores River","wd":0.05,"wp":[12.03764,125.34827],"wst":"matched","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7801},{"i":9727,"cid":"22LB0124","pid":"P00620167MN","t":"Rehabilitation of Drainage Structure along Mamay Creek, NHA Zone 2 Section, Sta. 0+000 - Sta. 1+790, Brgy. Buhangin, Davao City","w":"Rehabilitation / Major Repair of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"JD SOMOZA BUILDERS","c":29400000.0,"abc":29400000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-04-16","lat":7.11397,"lon":125.6229,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Mamay","wn":"Mamay Creek","wd":0.01,"wp":[7.11386,125.62286],"wst":"matched","br":"Buhangin","len":1790.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7802},{"i":9728,"cid":"22NB0014","pid":"P00620298MN","t":"Construction/Rehabilitation of Sinadyap River Phase II, Sta. 0+067.00 - Sta. 0+429 (L/S), Sta. 0+040.00 - Sta. 0+430.00 (R/S), Bayugan City, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ARQ BUILDERS","c":45079998.73,"abc":45080000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-03-24","lat":8.712154,"lon":125.770992,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":"Sinadyap","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":752.0,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7803},{"i":9729,"cid":"24KA0106","pid":"P00820034MN","t":"Construction of Flood Mitigation Structure along Linabo Bridge, barangay Linabo, Malaybalay City, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2024-12-16","lat":8.037678,"lon":125.153972,"sm":400,"fm":400,"tm":400,"am":400,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Linabo","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7804},{"i":9730,"cid":"22LF0090","pid":"P00620379MN","t":"Construction of Flood Mitigation Structure along Manurigao River (San Antonio Section), Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"ECBJ EASTCOAST CONSTRUCTION / MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":96499999.58,"abc":96500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-10-10","lat":7.416476,"lon":126.514185,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Manurigao","wn":"Manorigao River","wd":0.02,"wp":[7.41629,126.51426],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7805},{"i":9731,"cid":"24NC0023","pid":"P00820366MN","t":"Construction of Bank Protection of Bahayan River, near Primary Road (NRJ Cuevas-Bislig Road), Phase II, P-4 Duranta, Barangay Cuevas, Trento, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"TRENTO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"ROCK DIWATA BUILDERS, INC.","c":77199995.82,"abc":77200000.0,"fy":"2024","sd":"02/16/2024","cd":"2024-09-30","lat":8.021625,"lon":126.09145,"sm":1584,"fm":1584,"tm":1584,"am":1584,"md":0.0,"ls":"inside","ww":"Bahayan","wn":"Bahayan River","wd":0.09,"wp":[8.02126,126.09217],"wst":"matched","br":"Cuevas","len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7806},{"i":9732,"cid":"24KA0130","pid":"P00835774MN","t":"Construction of Flood Mitigation Structure, Barangay Mabuhay, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":112905000.0,"abc":112905000.0,"fy":"2024","sd":"03/21/2024","cd":"2024-11-12","lat":7.896053,"lon":125.351381,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Mabuhay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7807},{"i":9733,"cid":"24NA0004","pid":"P00820117MN","t":"Construction of Flood Mitigation Structure along Agay River, Barangay Balang-Balang, Remedios T. Romualdez, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"REMEDIOS T. ROMUALDEZ (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":72174973.97,"abc":72375000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-11-14","lat":9.05054,"lon":125.62478,"sm":1204,"fm":1204,"tm":1204,"am":1204,"md":0.0,"ls":"inside","ww":"Agay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balang-Balang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7808},{"i":9734,"cid":"22MB0091","pid":"P00634144MN","t":"Construction of Drainage with Curb and Gutter at Purok San Roque, Brgy. Labangal, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION)","c":4914808.13,"abc":4950000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-07-17","lat":6.100502,"lon":125.154162,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Labangal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7809},{"i":9735,"cid":"22LF0028","pid":"P00630517MN","t":"Construction of Flood Mitigation Structure along Manurigao River, Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"KODUS PEERS CONSTRUCTION CORPORATION / O. G. SANTOS CONSTRUCTION","c":67549604.08,"abc":67550000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-21","lat":7.416375,"lon":126.520351,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Manurigao","wn":"Manorigao River","wd":0.22,"wp":[7.41471,126.51927],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7810},{"i":9736,"cid":"22LA0089","pid":"P00631102MN","t":"Rehabilitation of Maputi Creek from Agusan River to Upstream of Maputi Bridge, Barangay Poblacion, Compostela, Davao de Oro","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":48999429.74,"abc":48999445.2,"fy":"2022","sd":"03/18/2022","cd":"2023-05-23","lat":7.672292,"lon":126.092378,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Maputi","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Poblacion","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7811},{"i":9737,"cid":"23IK0021","pid":"P00721589VS","t":"Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) / ALPHAHAWK CONSTRUCTION CORP.","c":110974928.2,"abc":110974982.1,"fy":"2023","sd":"02/13/2023","cd":"2023-05-10","lat":11.339297,"lon":125.155792,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7812},{"i":9738,"cid":"21LB0015","pid":"P00522194MN","t":"Construction of Revetment along R. Magsaysay Ave. Outfall, Davao City (Sta. 0+000 - Sta. 0+100)","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":39200000.0,"abc":39200000.0,"fy":"2021","sd":"11/21/2021","cd":"2022-09-07","lat":7.07359,"lon":125.624898,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7813},{"i":9739,"cid":"22LF0087","pid":"P00620377MN","t":"Construction of Flood Mitigation Structure along Casauman River, Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":96497439.49,"abc":96500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-11-25","lat":7.172922,"lon":126.52399,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Casauman","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7814},{"i":9740,"cid":"24NA0032","pid":"P00836195MN","t":"Construction of Flood Mitigation Structures along Kinabjangan River, Sitio Tagbabacon, Brgy. Culit, Nasipit, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"NASIPIT (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ERRA CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY ERRA CONSTRUCTION)","c":19799998.83,"abc":19600000.0,"fy":"2024","sd":"06/06/2024","cd":"2024-09-03","lat":8.929362,"lon":125.35431,"sm":1013,"fm":1013,"tm":1013,"am":1013,"md":0.0,"ls":"inside","ww":"Kinabjangan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Culit","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"field","s":24,"sig":[{"code":"above_budget_ceiling","group":"risk","strength":0.4,"value":1.0102,"text":"Contract cost is 1.02% above the approved budget for the contract (ABC), which is normally the bidding ceiling.","benign":"Approved variation orders after award can raise the final contract cost."}],"rk":944},{"i":9741,"cid":"22NC0043","pid":"P00634148MN","t":"Construction of Flood Mitigation Structure, Adgawan River Flood Control (Phase II) La Paz, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"LA PAZ (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":49499973.79,"abc":49500000.0,"fy":"2022","sd":"06/30/2022","cd":"2023-06-05","lat":8.239575,"lon":125.778978,"sm":724,"fm":724,"tm":null,"am":724,"md":0.0,"ls":"inside","ww":"Adgawan","wn":"Adgawan River","wd":0.03,"wp":[8.23982,125.77888],"wst":"matched","br":null,"len":null,"ph":"Phase II","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7815},{"i":9742,"cid":"22LA0151","pid":"P00620225MN","t":"Construction of Revetment along Agusan River, Sta. 16+347 - Sta. 18+570 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NEW BATAAN (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":86849711.45,"abc":86849998.54,"fy":"2022","sd":"04/04/2022","cd":"2022-12-30","lat":7.604387,"lon":126.09329,"sm":1019,"fm":1019,"tm":1019,"am":1019,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":3.63,"wp":[7.63065,126.11295],"wst":"matched","br":"Magsaysay","len":2223.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":38,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.54,"value":3.63,"text":"The title names Agusan, which OpenStreetMap maps through the stated municipality, but the pin is 3.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":331},{"i":9743,"cid":"22IK0032","pid":"P00620216VS","t":"Construction of Flood Control Protection works Structure, Golden Bridge, San Juanico Basey- Sohoton Road, Basey, Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SAMAR (WESTERN SAMAR)","mu":"BASEY (SAMAR (WESTERN SAMAR))","deo":"Samar 2nd District Engineering Office","co":"JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION)","c":48997687.3,"abc":49000000.98,"fy":"2022","sd":"02/14/2022","cd":"2022-09-18","lat":11.342647,"lon":125.158426,"sm":174,"fm":174,"tm":174,"am":174,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7816},{"i":9744,"cid":"22IB0006","pid":"P00620323VS","t":"Construction of Flood Control along Oras River, Brgy. Buntay, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"888 ACY ENTERPRISES","c":48999967.04,"abc":48984764.58,"fy":"2022","sd":"02/13/2022","cd":"2022-09-13","lat":12.217381,"lon":125.354775,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":"Oras","wn":"Oras River","wd":0.03,"wp":[12.21735,125.35454],"wst":"matched","br":"Buntay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7817},{"i":9745,"cid":"24LC0071","pid":"P00836188MN","t":"Construction of Drainage, Herculina L. Edig Es.,Canocotan,Tagum Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"CARESYSTEM TECHNOLOGY SOLUTION CO., INC.","c":4949970.75,"abc":4950000.0,"fy":"2024","sd":"05/14/2024","cd":"2024-09-05","lat":7.406964,"lon":125.778997,"sm":426,"fm":426,"tm":null,"am":426,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7818},{"i":9746,"cid":"22IL0099","pid":"P00620227VS","t":"Construction of Das-ay Flood Control, Hinunangan, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"HINUNANGAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2023-01-09","lat":10.529599,"lon":125.158937,"sm":624,"fm":624,"tm":624,"am":1454,"md":7.73,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":47,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.8,"value":7.73,"text":"The pin is 7.7 km outside Hinunangan, Southern Leyte, the nearest municipality the record claims. It falls in Silago, Southern Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":221},{"i":9747,"cid":"23NF0042","pid":"P00732466MN","t":"Construction of Slope Protection Structure along NRJ Don Paulino - Bingag - Osmeña Road (KM 001+000 - K001+500) Phase 1, Dapa, Surigao del Norte","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DAPA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":58899989.45,"abc":59400000.0,"fy":"2023","sd":"05/10/2023","cd":"2023-10-01","lat":9.75999,"lon":126.0938,"sm":483,"fm":483,"tm":483,"am":483,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":"Phase 1","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7819},{"i":9748,"cid":"22LF0053","pid":"P00630501MN","t":"Construction of Coastal Protection along Surigao del Sur Bdry - Davao Oriental Coastal Road (Tagtalisay Section), Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY / O. G. SANTOS CONSTRUCTION","c":67549370.29,"abc":67550000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-12-02","lat":7.190515,"lon":126.535088,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7820},{"i":9749,"cid":"22NF0100","pid":"P00634126MN","t":"Construction of Slope Protection Works, Union-Butong-Consuelo Road, Surigao del Norte","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"GENERAL LUNA (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"BOOMETRIX DEVELOPMENT CORP.","c":72789588.85,"abc":89100000.0,"fy":"2022","sd":"07/28/2022","cd":"2022-12-15","lat":9.76667,"lon":126.09944,"sm":574,"fm":574,"tm":null,"am":483,"md":1.23,"ls":"adjacent","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7821},{"i":9750,"cid":"22IL0100","pid":"P00620231VS","t":"Construction of Maag Flood Flood Control, Silago, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"SILAGO (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.","c":48994280.63,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":10.526554,"lon":125.159273,"sm":1454,"fm":1454,"tm":1454,"am":1454,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7822},{"i":9751,"cid":"21LB0115","pid":"P00522078MN","t":"Construction of Flood Mitigation Facility - Davao City Div Rd, Laverna Section, Brgy. Buhangin, Davao City","w":"Construction of Flood Mitigation Facility","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":96500000.0,"abc":96500000.0,"fy":"2021","sd":"06/05/2022","cd":"2023-11-28","lat":7.073603,"lon":125.624947,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Buhangin","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7823},{"i":9752,"cid":"23L00052","pid":"P00721576MN","t":"Construction of Flood Control Structure Outfall to Digos-Makar Road, Sulop, Davao del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"SULOP (DAVAO DEL SUR)","deo":"Davao del Sur District Engineering Office","co":"J.H.R. ENTERPRISES","c":90243232.16,"abc":90710000.0,"fy":"2023","sd":"08/15/2023","cd":"2024-06-08","lat":6.58327,"lon":125.356996,"sm":1488,"fm":1488,"tm":1488,"am":888,"md":0.08,"ls":"boundary","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7824},{"i":9753,"cid":"24LF0128","pid":"P00821194MN","t":"Construction of Flood Mitigation Structure along Mahan-ub River, Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":57898426.51,"abc":57900000.0,"fy":"2024","sd":"03/27/2024","cd":"2024-11-04","lat":7.209698,"lon":126.538183,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Mahan-ub","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7825},{"i":9754,"cid":"22LC0032","pid":"P00620084MN","t":"Rehabilitation of Flood Control Structure, San Isidro Creek protecting Agusan - Davao Road, Davao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":56899821.8,"abc":56900000.0,"fy":"2022","sd":"03/01/2022","cd":"2022-12-26","lat":7.395728,"lon":125.781231,"sm":426,"fm":426,"tm":null,"am":426,"md":0.0,"ls":"inside","ww":"San Isidro","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7826},{"i":9755,"cid":"22LG0012","pid":"P00620181MN","t":"Construction of Flood Mitigation Structure along Tubo-Tubo River, Sta. 0+000 - Sta. 0+695, Governor Generoso, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"GOVERNOR GENEROSO (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-10-10","lat":6.62761,"lon":126.09959,"sm":593,"fm":593,"tm":593,"am":593,"md":0.0,"ls":"inside","ww":"Tubo-Tubo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":695.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7827},{"i":9756,"cid":"24MB0078","pid":"P00836193MN","t":"Construction of Flood Control Structure, (Concrete Revetment), Sinawal River, Barangay Labangal, General Santos City","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"PLUS CONSTRUCTION INDUSTRIES CORP.","c":24748196.43,"abc":24750000.0,"fy":"2024","sd":"08/14/2024","cd":"2025-02-04","lat":6.110096,"lon":125.161399,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":"Sinawal","wn":"Sinawal River","wd":0.02,"wp":[6.11024,125.16139],"wst":"matched","br":"Labangal","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7828},{"i":9757,"cid":"21LD0054","pid":"P00550456MN","t":"Rehabilitation of Concrete Revetment along Digos River, Purok Centennial Section, Barangay Zone 1, Digos City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"City of Digos","deo":"Davao del Sur District Engineering Office","co":"THREE W BUILDERS, INC.","c":57900000.0,"abc":57900000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-12-19","lat":6.76071,"lon":125.36199,"sm":383,"fm":null,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.05,"wp":[6.76045,125.36161],"wst":"matched","br":"Zone 1","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7829},{"i":9758,"cid":"23LI0009","pid":"P00721500MN","t":"Construction of Revetment along Upper Agusan River, Osmeña Section, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"DAVAO CONCRETE PRODUCTS CONSTRUCTION AND TRADING CORPORATION (FORMERLY: DAVAO CONCRETE PRODUCTS)","c":31065458.31,"abc":31066000.0,"fy":"2023","sd":"02/13/2023","cd":"2023-08-20","lat":7.655691,"lon":126.099837,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Upper Agusan","wn":"Upper Agusan River","wd":3.47,"wp":[7.63709,126.07457],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.53,"value":3.47,"text":"The title names Upper Agusan, which OpenStreetMap maps through the stated municipality, but the pin is 3.5 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":405},{"i":9759,"cid":"22NB0022","pid":"P00620297MN","t":"Construction/Rehabilitation of Maytibog River Training along Agusan-Davao Road, Sta. 0+011.00 - Sta. 0+300.00, Bayugan City, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"CITY OF BAYUGAN (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"MADYAW CONSTRUCTION & DEV. CORPORATION","c":44206819.84,"abc":44206820.0,"fy":"2022","sd":"05/24/2022","cd":"2023-03-03","lat":8.71143,"lon":125.795479,"sm":370,"fm":370,"tm":370,"am":370,"md":0.0,"ls":"inside","ww":"Maytibog","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":289.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7830},{"i":9760,"cid":"23LG0065","pid":"P00721619MN","t":"Construction of Flood Mitigation Structure along Tubo-tubo River, Governor Generoso, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"GOVERNOR GENEROSO (DAVAO ORIENTAL)","deo":"Davao Oriental 2nd District Engineering Office","co":"MAER SUMMIT KONSTRUKT CO.","c":14394496.26,"abc":14700000.0,"fy":"2023","sd":"03/27/2023","cd":"2023-08-15","lat":6.632814,"lon":126.106031,"sm":593,"fm":593,"tm":593,"am":593,"md":0.0,"ls":"inside","ww":"Tubo-tubo","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7831},{"i":9761,"cid":"22LF0012","pid":"P00620075MN","t":"Construction of Revetment along Mahan-ub River, Sta. 0+000 - Sta. 0+750, Manay, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":63332916.37,"abc":63333915.0,"fy":"2022","sd":"02/21/2022","cd":"2023-03-14","lat":7.211419,"lon":126.538396,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Mahan-ub","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7832},{"i":9762,"cid":"24KK0064","pid":"P00836151MN","t":"Construction of Flood Control Project along Odiongan River (Downstream, Left Side), Gingoog City, Misamis Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"MISAMIS ORIENTAL","mu":"GINGOOG CITY (MISAMIS ORIENTAL)","deo":"Misamis Oriental 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES / EQUALYZ TRADING","c":98995000.0,"abc":99000000.0,"fy":"2024","sd":"06/10/2024","cd":"2024-10-31","lat":8.84335,"lon":125.16309,"sm":585,"fm":585,"tm":585,"am":585,"md":0.0,"ls":"inside","ww":"Odiongan","wn":"Odiongan River","wd":0.09,"wp":[8.84367,125.16385],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7833},{"i":9763,"cid":"22LB0031","pid":"P00620165MN","t":"Construction of Revetment along R. Magsaysay Ave. Outfall, Sta. 0+100 - Sta. 0+200, Davao City","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":39200000.0,"abc":39200000.0,"fy":"2022","sd":"03/23/2022","cd":"2022-09-24","lat":7.073171,"lon":125.62552,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":100.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7834},{"i":9764,"cid":"23K00100","pid":"P00721262MN","t":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Malambago Stream - Tributary to Pulangui River), Barangay Malambago, Package 2, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":56560489.27,"abc":57899929.25,"fy":"2023","sd":"02/13/2023","cd":"2024-05-01","lat":7.869665,"lon":125.365988,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Malambago","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malambago","len":null,"ph":"Package 2","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7835},{"i":9765,"cid":"22NG0012","pid":"P00630646MN","t":"Construction of River Control Structure, Barangay Dugsangon, Bacuag, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BACUAG (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":48999993.79,"abc":49000000.0,"fy":"2022","sd":"03/11/2022","cd":"2022-11-21","lat":9.569064,"lon":125.628,"sm":99,"fm":99,"tm":99,"am":99,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dugsangon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7836},{"i":9766,"cid":"24LF0030","pid":"P00820177MN","t":"Construction of Flood Mitigation Structure Protecting Surigao del Sur Boundary - Davao Oriental Coastal Road (Dapnan Bridge), Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"LICSAL CONSTRUCTION CORPORATION","c":48997746.86,"abc":49000000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-10-04","lat":7.641849,"lon":126.539871,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7837},{"i":9767,"cid":"23LI0033","pid":"P00721569MN","t":"Construction of Flood Control Structure along Aguibawa Creek, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.","c":96499753.59,"abc":96500000.0,"fy":"2023","sd":"03/24/2023","cd":"2023-12-10","lat":7.670928,"lon":126.10867,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Aguibawa","wn":"Agibawa River","wd":0.31,"wp":[7.67307,126.11043],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7838},{"i":9768,"cid":"24LC0072","pid":"P00836189MN","t":"Construction of Drainage, Prk. Liwayway 2nd Avenue,Magugpo South,Tagum Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"RUBIKS CONSTRUCTION CORPORATION","c":4949999.92,"abc":4950000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-08-26","lat":7.400528,"lon":125.799861,"sm":426,"fm":426,"tm":null,"am":426,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7839},{"i":9769,"cid":"22KA0060","pid":"P00620115MN","t":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Malambago Stream - Tributary to Pulangui River), Brgy. Malambago, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"M. MONTESCLAROS ENTERPRISES, INC.","c":48999992.0,"abc":49000000.0,"fy":"2022","sd":"01/28/2022","cd":"2023-09-03","lat":7.8716,"lon":125.36703,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":"Malambago","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Malambago","len":200.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7840},{"i":9770,"cid":"22MB0090","pid":"P00634143MN","t":"Construction of Drainage Canal From Tieza Street to Bulaong Avenue, Brgy. Dadiangas North, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"CROSMAK CONSTRUCTION WORKS INCORPORATED","c":7210020.33,"abc":7920000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-07-20","lat":6.113611,"lon":125.164167,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7841},{"i":9771,"cid":"22LC0201","pid":"P00632610MN","t":"Construction of Drainage Canal at Visayan Village, Tagum City, Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY)","c":4949815.11,"abc":4950000.0,"fy":"2022","sd":"04/07/2022","cd":"2022-09-11","lat":7.417486,"lon":125.815139,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7842},{"i":9772,"cid":"24KA0069","pid":"P00820043MN","t":"Construction of Flood Mitigation Structure in Barangay Magkalungay, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION)","c":144750000.0,"abc":144750000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-03-25","lat":7.860592,"lon":125.370344,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magkalungay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7843},{"i":9773,"cid":"22LF0003","pid":"P00620173MN","t":"Construction of Revetment along Manay River (Sitio Bato Section), Sta. 0+000 - Sta. 0+600, Manay, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY","c":48999024.42,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-09-28","lat":7.232008,"lon":126.540339,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Manay","wn":"Manay River","wd":0.01,"wp":[7.23202,126.54045],"wst":"matched","br":null,"len":600.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7844},{"i":9774,"cid":"23NH0062","pid":"P00734008MN","t":"Construction of Slope Protection Cagmino Bridge along Surigao-Davao Coastal Road, Lanuza, Surigao del Sur","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"SURIGAO DEL SUR","mu":"LANUZA (SURIGAO DEL SUR)","deo":"Surigao del Sur 1st District Engineering Office","co":"LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)","c":95527824.85,"abc":96500000.0,"fy":"2023","sd":"05/18/2023","cd":"2024-02-22","lat":9.2536,"lon":126.1119,"sm":749,"fm":749,"tm":749,"am":749,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7845},{"i":9775,"cid":"24MC0034","pid":"P00820190MN","t":"Construction of Flood Control Dike along Bulatukan River, Sta. 61+930 - Sta. 62+270 R/S, Barangay New Bulatukan, Makilala, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-12-04","lat":6.910054,"lon":125.166045,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Bulatukan","wn":"Bulatukan River","wd":0.02,"wp":[6.91023,125.166],"wst":"matched","br":"New Bulatukan","len":340.0,"ph":null,"dup":[],"run":[9784,9800],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24MC0034 to 24MC0036) cover the same site, together worth PHP 145,772,644.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":535},{"i":9776,"cid":"22LF0088","pid":"P00620378MN","t":"Construction of Flood Mitigation Structure along Manay River (Sitio Libtong Section), Manay, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"MANAY (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)","c":96496047.93,"abc":96500000.0,"fy":"2022","sd":"03/28/2022","cd":"2022-12-15","lat":7.21079,"lon":126.542418,"sm":913,"fm":913,"tm":913,"am":913,"md":0.0,"ls":"inside","ww":"Manay","wn":"Manay River","wd":0.06,"wp":[7.21093,126.54186],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7846},{"i":9777,"cid":"23NA0050","pid":"P00721625MN","t":"Construction of Slope Protection along Mahaba Bridge Approaches, Cabadbaran City, Agusan de Norte","w":"Construction of Slope Protection Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"TUBAY (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":48999995.59,"abc":49000000.0,"fy":"2023","sd":"09/13/2023","cd":"2024-04-30","lat":9.101825,"lon":125.630475,"sm":375,"fm":1591,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":25,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":8.26,"text":"The record contradicts itself: the title and the pin point to City of Cabadbaran, Agusan del Norte, but the municipality field names Tubay, Agusan del Norte, 8 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":527},{"i":9778,"cid":"23ME0056","pid":"P00734379MN","t":"Construction of Flood Control Structure, Sitio Famorcan, Brgy. Pag-Asa, Alabel, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":98981162.22,"abc":99000000.0,"fy":"2023","sd":"05/02/2023","cd":"2024-06-03","lat":6.08323,"lon":125.37483,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Pag-Asa","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7847},{"i":9779,"cid":"24LF0039","pid":"P00833297MN","t":"Construction of Flood Mitigation Structure along Caraga River (San Pedro Section), Caraga, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"ECBJ EASTCOAST CONSTRUCTION","c":48249965.4,"abc":48250000.0,"fy":"2024","sd":"04/22/2024","cd":"2024-08-16","lat":7.324222,"lon":126.54391,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.2,"wp":[7.32253,126.54328],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7848},{"i":9780,"cid":"24NA0010","pid":"P00820380MN","t":"Construction of Flood Mitigation Structure along Cabadbaran River, Barangay Mahaba, Cabadbaran City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"CITY OF CABADBARAN (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"DATREBIL CONSTRUCTION & SUPPLY","c":72271912.08,"abc":72375000.0,"fy":"2024","sd":"02/21/2024","cd":"2024-12-01","lat":9.101709,"lon":125.630627,"sm":375,"fm":375,"tm":375,"am":375,"md":0.0,"ls":"inside","ww":"Cabadbaran","wn":"Cabadbaran River","wd":1.78,"wp":[9.11711,125.62588],"wst":"matched","br":"Mahaba","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7849},{"i":9781,"cid":"23KA0102","pid":"P00732051MN","t":"Construction of Flood Mitigation Structure, Barangay Sumpitan, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"04/19/2023","cd":"2023-11-21","lat":7.838193,"lon":125.3776,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sumpitan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7850},{"i":9782,"cid":"23LI0087","pid":"P00721564MN","t":"Construction of Flood Mitigation structure along Callawan River, Barangay Cabinuangan, New Bataan, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"NEW BATAAN (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2023","sd":"05/26/2023","cd":"2024-03-03","lat":7.556796,"lon":126.116714,"sm":1019,"fm":1019,"tm":1019,"am":1019,"md":0.0,"ls":"inside","ww":"Callawan","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Cabinuangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7851},{"i":9783,"cid":"22LC0037","pid":"P00620222MN","t":"Construction of Hijo River Flood Control Structure from Brgy. Magdum-Brgy. East-Brgy. Apokon, Tagum City, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":95499998.73,"abc":95500000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-27","lat":7.434233,"lon":125.82785,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.01,"wp":[7.43423,125.82791],"wst":"matched","br":"Magdum-Brgy. East-Brgy. Apokon","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7852},{"i":9784,"cid":"24MC0035","pid":"P00820191MN","t":"Construction of Flood Control Dike along Bulatukan River, Sta. 62+270 - Sta. 62+610 R/S, Barangay New Bulatukan, Makilala, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48755000.0,"abc":49000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-12-03","lat":6.913192,"lon":125.167464,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Bulatukan","wn":"Bulatukan River","wd":0.01,"wp":[6.91327,125.16743],"wst":"matched","br":"New Bulatukan","len":340.0,"ph":null,"dup":[],"run":[9775,9800],"cl":[],"L":"field","s":35,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24MC0034 to 24MC0036) cover the same site, together worth PHP 145,772,644.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":536},{"i":9785,"cid":"22LA0086","pid":"P00630763MN","t":"Construction of Revetment along Hijo River, Barangay Pangi, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":67549978.79,"abc":67549978.79,"fy":"2022","sd":"03/18/2022","cd":"2023-03-29","lat":7.43569,"lon":125.828044,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.02,"wp":[7.43569,125.82788],"wst":"matched","br":"Pangi","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7853},{"i":9786,"cid":"23MB0088","pid":"P00734411MN","t":"Construction of Drainage, Barangay Dadiangas North, General Santos City, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"GRECO CONSTRUCTION AND SUPPLY","c":4949311.86,"abc":4950000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-07-10","lat":6.117001,"lon":125.168904,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7854},{"i":9787,"cid":"23LF0074","pid":"P00721427MN","t":"Construction of Flood Mitigation Structure along Caraga River (Lower San Pedro Protection), Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":96499134.78,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-09-11","lat":7.320977,"lon":126.547573,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.25,"wp":[7.31881,126.54823],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7855},{"i":9788,"cid":"23LE0026","pid":"P00732490MN","t":"Construction of Concrete Revetment along Bolila-Bito-Mana Diversion Road, Malita, Davao Occidental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO OCCIDENTAL","mu":"MALITA (DAVAO OCCIDENTAL)","deo":"Davao Occidental District Engineering Office","co":"HVC SAGITTARIUS COMMERCIAL & CONSTRUCTION","c":19789822.44,"abc":19800000.0,"fy":"2023","sd":"02/09/2023","cd":"2023-07-03","lat":6.336952,"lon":125.632283,"sm":899,"fm":899,"tm":899,"am":899,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7856},{"i":9789,"cid":"21LD0055","pid":"P00550457MN","t":"Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"City of Digos","deo":"Davao del Sur District Engineering Office","co":"VICENTE T. LAO CONSTRUCTION","c":48250000.0,"abc":48250000.0,"fy":"2021","sd":"03/24/2022","cd":"2022-09-19","lat":6.74295,"lon":125.37929,"sm":383,"fm":null,"tm":383,"am":383,"md":0.0,"ls":"inside","ww":"Digos","wn":"Digos River","wd":0.02,"wp":[6.74301,125.37942],"wst":"matched","br":"Aplaya","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7857},{"i":9790,"cid":"22LB0197","pid":"P00630599MN","t":"Construction of Drainage Canals, Colman to San Miguel, Centro (San Juan), Agdao District, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":9800000.0,"abc":9800000.0,"fy":"2022","sd":"04/06/2022","cd":"2023-07-02","lat":7.088098,"lon":125.636874,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7858},{"i":9791,"cid":"23LI0053","pid":"P00721572MN","t":"Construction of Revetment along Aguibawa River, San Miguel - Osmeña, Compostela, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"COMPOSTELA (DAVAO DE ORO)","deo":"Davao de Oro 2nd District Engineering Office","co":"METRO GEAR CONSTRUCTION CORP. / REPLICON CONSTRUCTION CORPORATION","c":96499980.76,"abc":96500000.0,"fy":"2023","sd":"03/28/2023","cd":"2024-03-22","lat":7.640752,"lon":126.124512,"sm":447,"fm":447,"tm":447,"am":447,"md":0.0,"ls":"inside","ww":"Aguibawa","wn":"Agibawa River","wd":0.0,"wp":[7.64074,126.12448],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7859},{"i":9792,"cid":"22LF0060","pid":"P00620172MN","t":"Construction of Kabuyawan Flood Control, Sta. 0+000 - Sta. 0+300, Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JAI BUILDERS CORPORATION ( FORMERLY JAI BUILDERS AND SUPPLY)","c":29399619.35,"abc":29400000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-01-03","lat":7.675396,"lon":126.548072,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":300.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7860},{"i":9793,"cid":"21LC0186","pid":"P00550505MN","t":"Construction of lined canal leading to outfall protecting National Rd. (Daang Maharlika) along Magdum section, Tagum City, Davao del Norte","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"City of Tagum","deo":"Davao del Norte District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":9900000.0,"abc":9900000.0,"fy":"2021","sd":"08/18/2022","cd":"2022-12-28","lat":7.459444,"lon":125.831667,"sm":426,"fm":null,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7861},{"i":9794,"cid":"23ME0053","pid":"P00733999MN","t":"Construction of Flood Mitigating Structure, Pag-Asa, Alabel, Sarangani Province","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"ALABEL (CAPITAL) (SARANGANI)","deo":"Sarangani District Engineering Office","co":"JDRC CONSTRUCTION & SUPPLIES, CORP.","c":77199980.12,"abc":77200000.0,"fy":"2023","sd":"05/02/2023","cd":"2024-03-12","lat":6.09252,"lon":125.38008,"sm":18,"fm":18,"tm":18,"am":18,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7862},{"i":9795,"cid":"20LB0084","pid":"P00420399MN","t":"Construction of Drainage Structure - Davao City Div Rd - K1501+860, La Verna Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ACD ASTROBUILT CONSTRUCTION & DEVELOPMENT, INC. (FORMERLY:ASTROBUILT CONSTRUCTION & DEVELOPMENT) / ABU CONSTRUCTION","c":74570375.0,"abc":74570375.0,"fy":"2020","sd":"12/17/2020","cd":"2022-12-07","lat":7.12627,"lon":125.63845,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7863},{"i":9796,"cid":"24MB0032","pid":"P00833600MN","t":"Construction of Drainage System, Barangay Dadiangas North, General Santos City, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"A.L. ACHARON CONSTRUCTION AND SUPPLY","c":4948404.37,"abc":4950000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-07-10","lat":6.118318,"lon":125.169622,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas North","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7864},{"i":9797,"cid":"23LF0073","pid":"P00721443MN","t":"Construction of Flood Mitigation Structure along Baganga - Mahan-ub River, Sta. 0 + 000 - Sta. 0 + 500, Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC.","c":96499472.49,"abc":96500000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-07-24","lat":7.574909,"lon":126.549158,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":"Mahan-ub","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":500.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7865},{"i":9798,"cid":"23M00045","pid":"P00721306MN","t":"Construction of Daan Suyan-Lun Padidu River Control, Package A, Malapatan, Sarangani","w":"Construction of Flood Mitigation Structure","rg":"Region XII","pv":"SARANGANI","mu":"MALAPATAN (SARANGANI)","deo":"Sarangani District Engineering Office","co":"J.G. ORANZA CONSTRUCTION","c":96480601.49,"abc":96500000.0,"fy":"2023","sd":"08/30/2023","cd":"2024-04-15","lat":6.055833,"lon":125.380833,"sm":890,"fm":890,"tm":890,"am":890,"md":0.0,"ls":"inside","ww":"Daan Suyan-Lun Padidu","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":"Package A","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7866},{"i":9799,"cid":"20LB0084","pid":"P00420399MN","t":"Construction of Drainage Structure - Davao City Div Rd - K1501+860, La Verna Section, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"Davao City","deo":"Davao City District Engineering Office","co":"ACD ASTROBUILT CONSTRUCTION & DEVELOPMENT, INC. (FORMERLY:ASTROBUILT CONSTRUCTION & DEVELOPMENT) / ABU CONSTRUCTION","c":74570375.0,"abc":74570375.0,"fy":"2021","sd":"12/17/2020","cd":"2022-12-07","lat":7.12627,"lon":125.63845,"sm":500,"fm":null,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7867},{"i":9800,"cid":"24MC0036","pid":"P00820192MN","t":"Construction of Flood Control Dike along Bulatukan River, Sta. 62+800 - Sta. 63+140 R/S, Barangay New Bulatukan, Makilala, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. / JARGON CONSTRUCTION & SUPPLY","c":48262644.03,"abc":49000000.0,"fy":"2024","sd":"04/17/2024","cd":"2025-01-24","lat":6.9168,"lon":125.17056,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Bulatukan","wn":"Bulatukan River","wd":0.02,"wp":[6.917,125.17056],"wst":"matched","br":"New Bulatukan","len":340.0,"ph":null,"dup":[],"run":[9775,9784],"cl":[],"L":"field","s":34,"sig":[{"code":"consecutive_contracts","group":"risk","strength":0.55,"value":3,"text":"3 contracts with consecutive numbers (24MC0034 to 24MC0036) cover the same site, together worth PHP 145,772,644.","benign":"Long river walls are sometimes tendered as separate lots when one contractor lacks capacity for the whole length."}],"rk":573},{"i":9801,"cid":"24KA0107","pid":"P00820038MN","t":"Construction of Flood Mitigation Structure along Namnam Bridge, barangay Namnam, San Fernando, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"SAN FERNANDO (BUKIDNON)","deo":"Bukidnon 1st District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY","c":96500000.0,"abc":96500000.0,"fy":"2024","sd":"01/31/2024","cd":"2025-01-23","lat":7.828017,"lon":125.385025,"sm":1274,"fm":1274,"tm":1274,"am":1274,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Namnam","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7868},{"i":9802,"cid":"22IB0010","pid":"P00620179VS","t":"Construction of Flood Control Structure at Brgy. Cadian, Oras, Eastern Samar","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"EASTERN SAMAR","mu":"ORAS (EASTERN SAMAR)","deo":"Eastern Samar District Engineering Office","co":"PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)","c":49000000.0,"abc":48984765.36,"fy":"2022","sd":"02/13/2022","cd":"2022-11-04","lat":12.205513,"lon":125.385407,"sm":1041,"fm":1041,"tm":1041,"am":1041,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Cadian","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7869},{"i":9803,"cid":"22IL0081","pid":"P00620228VS","t":"Construction of Jubas Flood Control, Libagon, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"LIBAGON (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"JQD CONSTRUCTION & GENERAL SERVICES","c":19568359.5,"abc":19600000.0,"fy":"2022","sd":"02/10/2022","cd":"2022-11-19","lat":10.363134,"lon":125.17067,"sm":777,"fm":777,"tm":777,"am":624,"md":8.98,"ls":"outside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.82,"value":8.98,"text":"The pin is 9.0 km outside Libagon, Southern Leyte, the nearest municipality the record claims. It falls in Hinunangan, Southern Leyte.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."}],"rk":307},{"i":9804,"cid":"23LF0058","pid":"P00721442MN","t":"Construction of Flood Mitigation Structure along Caraga River, Sta. 0 + 000 - Sta. 0 + 410, Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JHARKHA CONSTRUCTION AND SUPPLY","c":57896577.84,"abc":57900000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-05-04","lat":7.322236,"lon":126.550796,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.21,"wp":[7.32071,126.55188],"wst":"matched","br":null,"len":410.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7870},{"i":9805,"cid":"24MB0031","pid":"P00833599MN","t":"Construction of Drainage System, Barangay Dadiangas East, General Santos City, South Cotabato","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"DRU CONSTRUCTION","c":9899281.94,"abc":9900000.0,"fy":"2024","sd":"02/23/2024","cd":"2024-06-21","lat":6.114878,"lon":125.173314,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7871},{"i":9806,"cid":"23LF0013","pid":"P00721441MN","t":"Construction of Flood Mitigation Structure along Baganga - Mahan-ub River, Sta. 0 + 000 - Sta. 0 + 540, Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"O. G. SANTOS CONSTRUCTION","c":67549886.03,"abc":67550000.0,"fy":"2023","sd":"03/03/2023","cd":"2023-06-20","lat":7.576821,"lon":126.551799,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":"Mahan-ub","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":540.0,"ph":null,"dup":[9815],"run":[],"cl":[],"L":"records","s":57,"sig":[{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 135,098,357.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":130},{"i":9807,"cid":"22LB0127","pid":"P00620168MN","t":"Rehabilitation of Mamay Creek, Angliongto Section, Sta. 0+000 - Sta. 0+735, Brgy. Buhangin, Davao City","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"LANDEVTECH CONSTRUCTION, INC. / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)","c":43727225.07,"abc":45080000.0,"fy":"2022","sd":"02/23/2022","cd":"2022-10-09","lat":7.109872,"lon":125.638713,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Mamay","wn":"Mamay Creek","wd":0.01,"wp":[7.10979,125.63871],"wst":"matched","br":"Buhangin","len":735.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7872},{"i":9808,"cid":"23LC0071","pid":"P00734373MN","t":"Construction of Hijo River Flood Control Structure along Brgy. Madaum, Tagum City, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"ROSBILL CONSTRUCTION AND SUPPLY / NICOMAG UTILITY PROJECTS CONSTRUCTION","c":148466210.5,"abc":148500000.0,"fy":"2023","sd":"04/11/2023","cd":"2023-12-17","lat":7.36719,"lon":125.83197,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.04,"wp":[7.36745,125.83216],"wst":"matched","br":"Madaum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7873},{"i":9809,"cid":"23NA0034","pid":"P00721626MN","t":"Construction of Flood Mitigation Structure along Agay River, Brgy. Balang-Balang RTR, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"REMEDIOS T. ROMUALDEZ (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":24153330.25,"abc":24500000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-03-31","lat":9.046767,"lon":125.639228,"sm":1204,"fm":1204,"tm":null,"am":1204,"md":0.0,"ls":"inside","ww":"Agay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"Balang-Balang RTR","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7874},{"i":9810,"cid":"24LC0073","pid":"P00836190MN","t":"Construction of Flood Control Structure along Hijo River, Brgy. Madaum, Tagum City, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"KANAWAY BUILDERS CORPORATION","c":148499998.4,"abc":148500000.0,"fy":"2024","sd":"04/02/2024","cd":"2024-12-04","lat":7.36585,"lon":125.834269,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.06,"wp":[7.36639,125.83434],"wst":"matched","br":"Madaum","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7875},{"i":9811,"cid":"22NB0042","pid":"P00620356MN","t":"Construction of Bank Protection of Sianib River along Daang Maharlika, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"MADYAW CONSTRUCTION & DEV. CORPORATION","c":48999771.46,"abc":49000000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-15","lat":8.67977,"lon":125.8387,"sm":1176,"fm":1176,"tm":null,"am":1176,"md":0.0,"ls":"inside","ww":"Sianib","wn":"Sianib River","wd":8.66,"wp":[8.60195,125.83092],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":40,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.66,"value":8.66,"text":"The title names Sianib, which OpenStreetMap maps through the stated municipality, but the pin is 8.7 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":308},{"i":9812,"cid":"22NG0039","pid":"P00630532MN","t":"Construction of Bacuag River Flood Control Protection, Bacuag, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"BACUAG (SURIGAO DEL NORTE)","deo":"Surigao del Norte 2nd District Engineering Office","co":"JMT CONSTRUCTION","c":71651428.31,"abc":72375000.0,"fy":"2022","sd":"03/11/2022","cd":"2023-06-30","lat":9.57833,"lon":125.6405,"sm":99,"fm":99,"tm":99,"am":99,"md":0.0,"ls":"inside","ww":"Bacuag","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7876},{"i":9813,"cid":"24MC0032","pid":"P00820188MN","t":"Construction of Flood Control Dike along Bulatukan River Sta. 63+370 - Sta. 63+710 L/S, Barangay Kisante, Makilala, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"MAKILALA (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":48753175.91,"abc":49000000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-12-02","lat":6.920299,"lon":125.1745,"sm":885,"fm":885,"tm":885,"am":885,"md":0.0,"ls":"inside","ww":"Bulatukan","wn":"Bulatukan River","wd":0.03,"wp":[6.92061,125.17449],"wst":"matched","br":"Kisante","len":340.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7877},{"i":9814,"cid":"22LA0110","pid":"P00620081MN","t":"Construction of Revetment along Tagbalaobao River up to Pindasan, Sta. 0+220.496 - Sta. 0+405.293 (LS), Sta. 0+547.475 - Sta. 0+610.611 (LS), Sta. 0+634.698 - Sta. 0+718.698 (LS), Sta. 0+289.988 - Sta. 0+566.777 (RS), Baybay Bucana, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MABINI (DOÑA ALICIA) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":67548568.84,"abc":67549912.57,"fy":"2022","sd":"04/04/2022","cd":"2022-12-10","lat":7.284512,"lon":125.841455,"sm":845,"fm":845,"tm":null,"am":845,"md":0.0,"ls":"inside","ww":"Tagbalaobao","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":608.7,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7878},{"i":9815,"cid":"23LF0057","pid":"P00721285MN","t":"Construction of Flood Mitigation Structure along Cateel River (Barangay Central), Sta. 0 + 000 - Sta. 0 + 540, Cateel, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CATEEL (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"J.H.R. ENTERPRISES","c":67548470.73,"abc":67550000.0,"fy":"2023","sd":"05/16/2023","cd":"2023-10-10","lat":7.576821,"lon":126.551799,"sm":354,"fm":354,"tm":354,"am":107,"md":15.3,"ls":"outside","ww":"Cateel","wn":"Cateel River","wd":21.56,"wp":[7.72481,126.42503],"wst":"matched","br":"Central","len":540.0,"ph":null,"dup":[9806],"run":[],"cl":[],"L":"records","s":82,"sig":[{"code":"outside_stated_municipality","group":"location","strength":0.89,"value":15.3,"text":"The pin is 15.3 km outside Cateel, Davao Oriental, the nearest municipality the record claims. It falls in Baganga, Davao Oriental.","benign":"The coordinates may have been encoded from an office location, a neighbouring town, or with a one-digit typo."},{"code":"far_from_named_waterway","group":"location","strength":0.79,"value":21.56,"text":"The title names Cateel, which OpenStreetMap maps through the stated municipality, but the pin is 21.6 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."},{"code":"pin_shared_across_municipalities","group":"location","strength":0.7,"value":1,"text":"This exact pin is shared with 1 other contract(s) that name a different municipality.","benign":"A default or copied coordinate may have been reused during encoding."},{"code":"shared_pin","group":"risk","strength":0.35,"value":1,"text":"1 other contract(s) with different titles use this exact pin, 1 of them funded in the same year. Combined value at this pin: PHP 135,098,357.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":16},{"i":9816,"cid":"22NB0041","pid":"P00620355MN","t":"Construction of Bank Protection along Agusan River, Hawilian Section, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"GIOVANNI CONSTRUCTION","c":48999983.23,"abc":49000000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-06-05","lat":8.665476,"lon":125.641175,"sm":553,"fm":553,"tm":null,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.12,"wp":[8.66542,125.64225],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7879},{"i":9817,"cid":"22LF0031","pid":"P00620221MN","t":"Construction of Flood Mitigation Structure along Caraga River (Cut-Off Channel), Sta. 0+000 - Sta. 0+750, Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK","c":92989850.86,"abc":93000000.0,"fy":"2022","sd":"02/21/2022","cd":"2023-01-24","lat":7.321746,"lon":126.552645,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":"Caraga","wn":"Caraga River","wd":0.03,"wp":[7.32156,126.55283],"wst":"matched","br":null,"len":750.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7880},{"i":9818,"cid":"22NB0004","pid":"P00620190MN","t":"Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+124.00, Prosperidad, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"DAVE CONSTRUCTION","c":11759997.45,"abc":11760000.0,"fy":"2022","sd":"06/13/2022","cd":"2023-01-03","lat":8.68102,"lon":125.84154,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":"Sianib","wn":"Sianib River","wd":8.83,"wp":[8.60195,125.83092],"wst":"matched","br":null,"len":124.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":34,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":8.83,"text":"The title names Sianib, which OpenStreetMap maps through the stated municipality, but the pin is 8.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":371},{"i":9819,"cid":"24MC0037","pid":"P00820193MN","t":"Construction of Meocan CIS Prop Protection Dike at Arakan River, Arakan, Cotabato","w":"Construction of Dike","rg":"Region XII","pv":"COTABATO (NORTH COTABATO)","mu":"ARAKAN (COTABATO (NORTH COTABATO))","deo":"Cotabato 2nd District Engineering Office","co":"LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON","c":34299999.54,"abc":34300000.0,"fy":"2024","sd":"02/20/2024","cd":"2024-09-10","lat":7.273994,"lon":125.177449,"sm":70,"fm":70,"tm":70,"am":70,"md":0.0,"ls":"inside","ww":"Arakan","wn":"Arakan River","wd":3.15,"wp":[7.26669,125.1499],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":31,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.52,"value":3.15,"text":"The title names Arakan, which OpenStreetMap maps through the stated municipality, but the pin is 3.1 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":406},{"i":9820,"cid":"23LF0012","pid":"P00721387MN","t":"Construction of Coastal Protection, Protecting Surigao Del Sur Bdry. Davao Oriental Coastal Road (San Victor Section), Sta. 0 + 000 - Sta. 0 + 350, Baganga, Davao Oriental","w":"Construction of Slope Protection Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JHARKHA CONSTRUCTION AND SUPPLY","c":29399700.03,"abc":29400000.0,"fy":"2023","sd":"03/28/2023","cd":"2023-06-30","lat":7.661772,"lon":126.552735,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":350.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7881},{"i":9821,"cid":"23NB0019","pid":"P00721655MN","t":"Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"ADFIL CORPORATION","c":53074962.28,"abc":53075000.0,"fy":"2023","sd":"03/31/2023","cd":"2023-10-25","lat":8.665556,"lon":125.6413,"sm":553,"fm":553,"tm":null,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.11,"wp":[8.6655,125.64226],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7882},{"i":9822,"cid":"23LF0075","pid":"P00732067MN","t":"Construction of Revetment along Baganga River (Baboy Section), Baganga, Davao Oriental","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"JHARKHA CONSTRUCTION AND SUPPLY / O. G. SANTOS CONSTRUCTION","c":96499312.8,"abc":96500000.0,"fy":"2023","sd":"04/04/2023","cd":"2023-08-16","lat":7.57071,"lon":126.554388,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":"Baganga","wn":"Baganga River","wd":0.04,"wp":[7.5705,126.55463],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7883},{"i":9823,"cid":"24NA0001","pid":"P00820118MN","t":"Construction of Flood Mitigation Structure along Agay River, Barangay San Antonio, Remedios T. Romualdez, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"REMEDIOS T. ROMUALDEZ (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":72174935.35,"abc":72375000.0,"fy":"2024","sd":"02/12/2024","cd":"2024-11-15","lat":9.069722,"lon":125.641944,"sm":1204,"fm":1204,"tm":1204,"am":1204,"md":0.0,"ls":"inside","ww":"Agay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Antonio","len":null,"ph":null,"dup":[9826],"run":[],"cl":[],"L":"field","s":20,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 96,611,429.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1066},{"i":9824,"cid":"22LF0051","pid":"P00620068MN","t":"Construction of Flood Mitigation Structure along Baganga River (Magum Section), Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":96499762.52,"abc":96500000.0,"fy":"2022","sd":"02/21/2022","cd":"2022-11-21","lat":7.577415,"lon":126.557153,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":"Baganga","wn":"Baganga River","wd":0.06,"wp":[7.57693,126.55742],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7884},{"i":9825,"cid":"22NB0005","pid":"P00620295MN","t":"Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+350.00 Upstream, Sta. 0+000.00 - Sta. 0+066.40 Downstream, Prosperidad, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"PROSPERIDAD (CAPITAL) (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"EQUI-PARCO CONSTRUCTION COMPANY","c":45079929.26,"abc":45080000.0,"fy":"2022","sd":"06/03/2022","cd":"2023-03-14","lat":8.6809,"lon":125.84174,"sm":1176,"fm":1176,"tm":1176,"am":1176,"md":0.0,"ls":"inside","ww":"Sianib","wn":"Sianib River","wd":8.82,"wp":[8.60195,125.83092],"wst":"matched","br":null,"len":416.4,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":39,"sig":[{"code":"far_from_named_waterway","group":"location","strength":0.67,"value":8.82,"text":"The title names Sianib, which OpenStreetMap maps through the stated municipality, but the pin is 8.8 km from it.","benign":"OpenStreetMap may only map part of the river, or the structure may protect a tributary with a similar name."}],"rk":318},{"i":9826,"cid":"23NA0035","pid":"P00721627MN","t":"Construction of Flood Mitigation Structure along Agay River, Brgy. San Antonio RTR, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"REMEDIOS T. ROMUALDEZ (AGUSAN DEL NORTE)","deo":"Agusan del Norte District Engineering Office","co":"ARQ BUILDERS","c":24436494.0,"abc":24500000.0,"fy":"2023","sd":"05/25/2023","cd":"2024-04-11","lat":9.069722,"lon":125.641944,"sm":1204,"fm":1204,"tm":null,"am":1204,"md":0.0,"ls":"inside","ww":"Agay","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":"San Antonio RTR","len":null,"ph":null,"dup":[9823],"run":[],"cl":[],"L":"field","s":16,"sig":[{"code":"shared_pin","group":"risk","strength":0.25,"value":1,"text":"1 other contract(s) with different titles use this exact pin. Combined value at this pin: PHP 96,611,429.","benign":"Multi-phase or multi-package works on one site can legitimately share a pin."}],"rk":1134},{"i":9827,"cid":"23KB0051","pid":"P00732481MN","t":"Construction of Box Culvert, Barangay Magsaysay, Quezon, Bukidnon","w":"Construction of Flood Mitigation Structure","rg":"Region X","pv":"BUKIDNON","mu":"QUEZON (BUKIDNON)","deo":"Bukidnon 2nd District Engineering Office","co":"ELC CONSTRUCTION AND TRADING","c":4950000.0,"abc":4950000.0,"fy":"2023","sd":"02/26/2023","cd":"2023-08-15","lat":7.7519,"lon":125.1778,"sm":1189,"fm":1189,"tm":1189,"am":1189,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Magsaysay","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7885},{"i":9828,"cid":"23LF0122","pid":"P00721570MN","t":"Construction of Flood Mitigation Structure along Baganga River, Baganga","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)","c":66536750.0,"abc":67550000.0,"fy":"2023","sd":"03/22/2023","cd":"2024-01-15","lat":7.573408,"lon":126.563408,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":"Baganga","wn":"Baganga River","wd":0.69,"wp":[7.57803,126.55922],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7886},{"i":9829,"cid":"23NC0044","pid":"P00734036MN","t":"Construction of river bank protection along Ihawan River, Barangay Johnson, Loreto, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"LORETO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"05/16/2023","cd":"2023-10-15","lat":8.090836,"lon":125.842258,"sm":811,"fm":811,"tm":811,"am":811,"md":0.0,"ls":"inside","ww":"Ihawan","wn":"Ihawan River","wd":0.04,"wp":[8.09115,125.84213],"wst":"matched","br":"Johnson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7887},{"i":9830,"cid":"21N00083","pid":"P00522129MN","t":"Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur","w":"Construction of Revetment","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 1st District Engineering Office","co":"ADFIL CORPORATION","c":115032425.2,"abc":115800000.0,"fy":"2021","sd":"01/03/2022","cd":"2023-02-11","lat":8.668186,"lon":125.642066,"sm":null,"fm":null,"tm":null,"am":553,"md":null,"ls":"unknown","ww":"Agusan","wn":"Agusan River","wd":0.09,"wp":[8.66794,125.64289],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":172},{"i":9831,"cid":"22MB0028","pid":"P00631109MN","t":"Construction of Drainage System at Kasoy Street, Barangay Dadiangas East, General Santos City","w":"Construction of Drainage Structure","rg":"Region XII","pv":"SOUTH COTABATO","mu":"GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)","deo":"South Cotabato 1st District Engineering Office","co":"HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION)","c":4587878.27,"abc":4950000.0,"fy":"2022","sd":"03/29/2022","cd":"2022-08-08","lat":6.114722,"lon":125.178056,"sm":578,"fm":578,"tm":578,"am":578,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Dadiangas East","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7888},{"i":9832,"cid":"22IL0030","pid":"P00620232VS","t":"Construction of Patong Flood Flood Control, Hinunangan, Southern Leyte","w":"Construction of Flood Mitigation Structure","rg":"Region VIII","pv":"SOUTHERN LEYTE","mu":"HINUNANGAN (SOUTHERN LEYTE)","deo":"Southern Leyte 1st District Engineering Office","co":"ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION)","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"02/16/2022","cd":"2022-10-13","lat":10.369428,"lon":125.178881,"sm":624,"fm":624,"tm":624,"am":624,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7889},{"i":9833,"cid":"23NC0033","pid":"P00732502MN","t":"Construction of Riverbank Protection, Barangay Johnson, Loreto, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"LORETO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION","c":9800000.0,"abc":9800000.0,"fy":"2023","sd":"04/21/2023","cd":"2023-10-15","lat":8.090931,"lon":125.842428,"sm":811,"fm":811,"tm":811,"am":811,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Johnson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7890},{"i":9834,"cid":"21LA0135","pid":"P00522361MN","t":"Construction of Revetment along Pindasan River  Baybay, Mabini, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"BATANGAS","mu":"Mabini","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":14699920.95,"abc":14699920.95,"fy":"2021","sd":"03/24/2022","cd":"2022-08-28","lat":7.283551,"lon":125.842526,"sm":845,"fm":null,"tm":845,"am":845,"md":0.0,"ls":"inside","ww":"Pindasan","wn":"Pindasan River","wd":0.02,"wp":[7.28371,125.84254],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7891},{"i":9835,"cid":"24NC0004","pid":"P00833603MN","t":"Construction of Riverbank Protection Structure, Barangay Johnson, Loreto, Agusan Del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"LORETO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION","c":7920000.0,"abc":7920000.0,"fy":"2024","sd":"05/27/2024","cd":"2024-08-17","lat":8.090814,"lon":125.842533,"sm":811,"fm":811,"tm":811,"am":811,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Johnson","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7892},{"i":9836,"cid":"22LA0169","pid":"P00630762MN","t":"Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"DREIRICH BUILDERS / THREE W BUILDERS, INC.","c":67549964.53,"abc":67549964.53,"fy":"2022","sd":"04/04/2022","cd":"2023-01-31","lat":7.410549,"lon":125.844233,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Hijo","wn":"Hijo River","wd":0.13,"wp":[7.40989,125.84325],"wst":"matched","br":"Dumlan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7893},{"i":9837,"cid":"22LC0030","pid":"P00620055MN","t":"Construction of Bank Protection, protecting Daang Maharlika, Magdum Section, Tagum City, Davao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL NORTE","mu":"CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)","deo":"Davao del Norte District Engineering Office","co":"GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)","c":76200000.0,"abc":76200000.0,"fy":"2022","sd":"02/24/2022","cd":"2022-12-24","lat":7.471225,"lon":125.846561,"sm":426,"fm":426,"tm":426,"am":426,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7894},{"i":9838,"cid":"22LF0006","pid":"P00620174MN","t":"Construction of Santiago Coastal Protection (Lower Mansanas), Sta. 0+000 - Sta. 0+450, Caraga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"CARAGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"MITZ CONSTRUCTION AND SUPPLY / O. G. SANTOS CONSTRUCTION","c":48999657.73,"abc":49000000.0,"fy":"2022","sd":"02/08/2022","cd":"2022-10-21","lat":7.286659,"lon":126.565341,"sm":330,"fm":330,"tm":330,"am":330,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":450.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7895},{"i":9839,"cid":"24ND0092","pid":"P00836197MN","t":"Construction of Flood Mitigation, Brgy. Anticala, Butuan City, Agusan del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL NORTE","mu":"BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)","deo":"Butuan City District Engineering Office","co":"HAPPY ALL3 BUILDERS CORPORATION","c":7883330.97,"abc":7903686.58,"fy":"2024","sd":"06/05/2024","cd":"2024-12-27","lat":8.99484,"lon":125.64218,"sm":268,"fm":268,"tm":268,"am":268,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Anticala","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7896},{"i":9840,"cid":"24LF0031","pid":"P00820178MN","t":"Construction of Flood Mitigation Structure Protecting Surigao del Sur Boundary - Davao Oriental Coastal Road (Lucod Section), Baganga, Davao Oriental","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO ORIENTAL","mu":"BAGANGA (DAVAO ORIENTAL)","deo":"Davao Oriental 1st District Engineering Office","co":"DBR CONSTRUCTION CORPORATION (FORMERLY: D.B. RAVELO CONSTRUCTION & SUPPLY)","c":9799963.68,"abc":9800000.0,"fy":"2024","sd":"04/08/2024","cd":"2024-10-26","lat":7.565238,"lon":126.569467,"sm":107,"fm":107,"tm":107,"am":107,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7897},{"i":9841,"cid":"24NB0023","pid":"P00820428MN","t":"Construction of Flood Control Project along Agusan River, Esperanza, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"ESPERANZA (AGUSAN DEL SUR)","deo":"Agusan del Sur 1st District Engineering Office","co":"BBC CONSTRUCTION","c":29399925.1,"abc":29400000.0,"fy":"2024","sd":"04/17/2024","cd":"2024-10-23","lat":8.669265,"lon":125.642348,"sm":553,"fm":553,"tm":553,"am":553,"md":0.0,"ls":"inside","ww":"Agusan","wn":"Agusan River","wd":0.1,"wp":[8.66901,125.64321],"wst":"matched","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7898},{"i":9842,"cid":"22LB0233","pid":"P00631099MN","t":"Construction of Drainage System at Dr. Santiago Dakudao National High School, Malagamot, Barangay Panacan, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":4950000.0,"abc":4950000.0,"fy":"2022","sd":"04/10/2022","cd":"2022-10-30","lat":7.161681,"lon":125.64314,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Panacan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7899},{"i":9843,"cid":"22LB0231","pid":"P00631097MN","t":"Construction of Drainage System at Amparo Homes, Barangay Ilang, Davao City","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"WANGCON DEVELOPMENT CORPORATION","c":9900000.0,"abc":9900000.0,"fy":"2022","sd":"03/31/2022","cd":"2022-07-26","lat":7.176077,"lon":125.643404,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Ilang","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7900},{"i":9844,"cid":"22LB0033","pid":"P00630601MN","t":"Construction of Flood Mitigation Structure along Bunawan River, Sta. 2 + 020 to Sta. 2 + 440, Davao City","w":"Construction of Flood Mitigation Structure","rg":"Region XI","pv":"DAVAO DEL SUR","mu":"DAVAO CITY (DAVAO DEL SUR)","deo":"Davao City District Engineering Office","co":"GENESIS88 CONSTRUCTION INC.","c":49000000.0,"abc":49000000.0,"fy":"2022","sd":"04/13/2022","cd":"2023-03-31","lat":7.238488,"lon":125.643826,"sm":500,"fm":500,"tm":500,"am":500,"md":0.0,"ls":"inside","ww":"Bunawan","wn":"Bunawan River","wd":0.02,"wp":[7.23831,125.64383],"wst":"matched","br":null,"len":420.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7901},{"i":9845,"cid":"22LA0112","pid":"P00620267MN","t":"Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+400 - Sta. 1+200, Brgy. Binuangan, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MACO (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"C'ZARLES CONSTRUCTION & SUPPLY","c":48999826.55,"abc":48999826.55,"fy":"2022","sd":"04/04/2022","cd":"2023-02-18","lat":7.363404,"lon":125.848815,"sm":851,"fm":851,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":"Binuangan","wn":"Binuangan Creek","wd":0.1,"wp":[7.36369,125.84966],"wst":"matched","br":"Binuangan","len":800.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7902},{"i":9846,"cid":"21LA0149","pid":"P00550576MN","t":"Construction of Revetment, Brgy. Binuangan, Maco, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"Maco","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":9899973.73,"abc":9899977.72,"fy":"2021","sd":"03/24/2022","cd":"2022-10-28","lat":7.363555,"lon":125.849583,"sm":851,"fm":null,"tm":851,"am":851,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Binuangan","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7903},{"i":9847,"cid":"22LA0119","pid":"P00634135MN","t":"Construction (Completion) of Drainage, Purok Marang, Pindasan, Mabini, Davao de Oro","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MABINI (DOÑA ALICIA) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":2939999.89,"abc":2939999.89,"fy":"2022","sd":"03/29/2022","cd":"2022-07-08","lat":7.281476,"lon":125.855759,"sm":845,"fm":845,"tm":845,"am":845,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7904},{"i":9848,"cid":"22LA0120","pid":"P00634998MN","t":"Construction of Flood Control  Drainage Del Pilar, Mabini, Davao de Oro","w":"Construction of Drainage Structure","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MABINI (DOÑA ALICIA) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"TWO DEGREES CONSTRUCTION AND SUPPLY","c":4899928.17,"abc":4899928.17,"fy":"2022","sd":"03/29/2022","cd":"2022-09-06","lat":7.296379,"lon":125.869372,"sm":845,"fm":845,"tm":845,"am":845,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7905},{"i":9849,"cid":"22LA0140","pid":"P00620367MN","t":"Construction of Revetment along Pangibiran River, Mabini, Davao de Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"MABINI (DOÑA ALICIA) (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.","c":19599910.02,"abc":19599910.02,"fy":"2022","sd":"03/29/2022","cd":"2022-10-18","lat":7.284913,"lon":125.870937,"sm":845,"fm":845,"tm":845,"am":845,"md":0.0,"ls":"inside","ww":"Pangibiran","wn":null,"wd":null,"wp":null,"wst":"not_mapped","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7906},{"i":9850,"cid":"22NC0035","pid":"P00620300MN","t":"Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 - Sta. 0+210.00, Loreto, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":"LORETO (AGUSAN DEL SUR)","deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION / CM TAN CONSTRUCTION","c":33765900.0,"abc":33765900.0,"fy":"2022","sd":"07/11/2022","cd":"2023-05-19","lat":8.123692,"lon":125.877717,"sm":811,"fm":811,"tm":811,"am":811,"md":0.0,"ls":"inside","ww":"Ihawan","wn":"Ihawan River","wd":0.03,"wp":[8.12345,125.87774],"wst":"matched","br":null,"len":115.0,"ph":"Phase III","dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7907},{"i":9851,"cid":"21NC0077","pid":"P00522268MN","t":"Construction of River Bank Protection of Ihawan River, Sta. 0 + 000 - Sta. 0 + 165, Agusan del Sur","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"AGUSAN DEL SUR","mu":null,"deo":"Agusan del Sur 2nd District Engineering Office","co":"DAVE CONSTRUCTION / FFJJ CONSTRUCTION","c":49000000.0,"abc":49000000.0,"fy":"2021","sd":"08/02/2021","cd":"2022-07-27","lat":8.11825,"lon":125.88172,"sm":null,"fm":null,"tm":null,"am":811,"md":null,"ls":"unknown","ww":"Ihawan","wn":"Ihawan River","wd":0.05,"wp":[8.11837,125.88129],"wst":"matched","br":null,"len":165.0,"ph":null,"dup":[],"run":[],"cl":[],"L":"insufficient","s":0,"sig":[],"rk":173},{"i":9852,"cid":"23LA0062","pid":"P00721616MN","t":"Construction of Revetment along Mabo Creek leading to Kingking River, Brgy. Kingking, Pantukan, Davao De Oro","w":"Construction of Revetment","rg":"Region XI","pv":"DAVAO DE ORO","mu":"PANTUKAN (DAVAO DE ORO)","deo":"Davao de Oro 1st District Engineering Office","co":"R.A. PAHATI CONST. & SUPPLY, INC.","c":34299422.58,"abc":34300000.0,"fy":"2023","sd":"03/10/2023","cd":"2023-12-24","lat":7.138258,"lon":125.890907,"sm":1097,"fm":1097,"tm":1097,"am":1097,"md":0.0,"ls":"inside","ww":"Mabo","wn":"Mabo Creek","wd":0.0,"wp":[7.13827,125.89089],"wst":"matched","br":"Kingking","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7908},{"i":9853,"cid":"22NF0136","pid":"P00644676MN","t":"Construction/Rehabilitation of Caub Shore Protection, Del Carmen, Surigao del Norte","w":"Construction of Flood Mitigation Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"DEL CARMEN (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"ROAD EDGE TRADING & DEVELOPMENT SERVICES","c":75671068.01,"abc":77200000.0,"fy":"2022","sd":"11/25/2022","cd":"2024-04-05","lat":9.89528,"lon":125.89527,"sm":501,"fm":501,"tm":501,"am":501,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":null,"len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"low","s":0,"sig":[],"rk":7909},{"i":9854,"cid":"23NF0095","pid":"P00745952MN","t":"Reconstruction/Rehabilitation of Seawall and Reclamation in Barangay Sta. Cruz, Municipality of Socorro, Surigao del Norte","w":"Rehabilitation / Major Repair of Flood Control Structure","rg":"Region XIII","pv":"SURIGAO DEL NORTE","mu":"PILAR (SURIGAO DEL NORTE)","deo":"Surigao del Norte 1st District Engineering Office","co":"DQT BUILDERS AND SUPPLY / ARN BUILDERS, INC. (FOR: ARN BUILDERS)","c":92206234.28,"abc":93137880.05,"fy":"2023","sd":"11/28/2023","cd":"2024-05-19","lat":9.645278,"lon":125.905556,"sm":1471,"fm":1136,"tm":1471,"am":1471,"md":0.0,"ls":"inside","ww":null,"wn":null,"wd":null,"wp":null,"wst":"none","br":"Sta. Cruz","len":null,"ph":null,"dup":[],"run":[],"cl":[],"L":"records","s":27,"sig":[{"code":"record_fields_disagree","group":"location","strength":0.35,"value":23.37,"text":"The record contradicts itself: the title and the pin point to Socorro, Surigao del Norte, but the municipality field names Pilar, Surigao del Norte, 23 km away.","benign":"Same-named towns exist in many provinces; this is most likely an encoding error in the record, not a missing structure."}],"rk":489}]